The Tampa Electric Company Polk Power Station is a nominal 25 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located southeast of Tampa in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round III award. The Polk Power Station uses oxygen-blown, entrained-flow coal gasification technology licensed from Texaco Development Corporation in conjunction with a General Electric combined cycle with an advanced combustion turbine. This IGCC configuration demonstrates significant reductions of SO{sub 2} and NOx emissions when compared to existing and future conventional coal-fired power plants. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. It was placed into commercial operation on September 30, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. The presentation features an up-to-the-minute update of actual performance parameters achieved by the Polk Power Station. These parameters include overall capacity, heat rate, and availability. Tests of four alternate feedstocks were conducted, and the resulting performance is compared to that achieved on their base coal. This paper also provides an update of the general operating experiences and shutdown causes ofmore »
- Authors:
-
- Tampa Electric Co., FL (United States). Polk Power Station
- Publication Date:
- OSTI Identifier:
- 349105
- Report Number(s):
- CONF-980985-
ISBN 1-890977-15-2; TRN: IM9924%%105
- Resource Type:
- Conference
- Resource Relation:
- Conference: 15. annual international Pittsburgh coal conference, Pittsburgh, PA (United States), 14-18 Sep 1998; Other Information: PBD: 1998; Related Information: Is Part Of Fifteenth annual international Pittsburgh coal conference: Proceedings; PB: [1500] p.
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 01 COAL, LIGNITE, AND PEAT; 20 FOSSIL-FUELED POWER PLANTS; FLORIDA; COMBINED-CYCLE POWER PLANTS; COAL GASIFICATION PLANTS; PERFORMANCE; FUEL SUPPLIES; COMPARATIVE EVALUATIONS; THERMAL EFFICIENCY
Citation Formats
Berry, T E. Tampa Electric Company Polk Power Station IGCC Project -- Project status. United States: N. p., 1998.
Web.
Berry, T E. Tampa Electric Company Polk Power Station IGCC Project -- Project status. United States.
Berry, T E. 1998.
"Tampa Electric Company Polk Power Station IGCC Project -- Project status". United States.
@article{osti_349105,
title = {Tampa Electric Company Polk Power Station IGCC Project -- Project status},
author = {Berry, T E},
abstractNote = {The Tampa Electric Company Polk Power Station is a nominal 25 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located southeast of Tampa in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round III award. The Polk Power Station uses oxygen-blown, entrained-flow coal gasification technology licensed from Texaco Development Corporation in conjunction with a General Electric combined cycle with an advanced combustion turbine. This IGCC configuration demonstrates significant reductions of SO{sub 2} and NOx emissions when compared to existing and future conventional coal-fired power plants. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. It was placed into commercial operation on September 30, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. The presentation features an up-to-the-minute update of actual performance parameters achieved by the Polk Power Station. These parameters include overall capacity, heat rate, and availability. Tests of four alternate feedstocks were conducted, and the resulting performance is compared to that achieved on their base coal. This paper also provides an update of the general operating experiences and shutdown causes of the gasification facility throughout 1997. Finally, the future plans for improving the reliability and efficiency of the Unit will be addressed, as well as plans for future additional alternate fuel test burns.},
doi = {},
url = {https://www.osti.gov/biblio/349105},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Dec 31 00:00:00 EST 1998},
month = {Thu Dec 31 00:00:00 EST 1998}
}