SP CREATE. Creating Sample Plans
- Westinghouse Savannah River Plant, Aiken, SC (United States)
The program has been designed to increase the accuracy and reduce the preparation time for completing sampling plans. It consists of our files 1. Analyte/Combination (AnalCombo) A list of analytes and combinations of analytes that can be requested of the onsite and offsite labs. Whenever a specific combination of analytes or suite names appear on the same line as the code number, this indicates that one sample can be placed in one bottle to be analyzed for these paremeters. A code number is assigned for each analyte and combination of analytes. 2. Sampling Plans Database (SPDb) A database that contains all of the analytes and combinations of analytes along with the basic information required for preparing a sample plan. That basic information includes the following fields; matrix, hold time, preservation, sample volume, container size, if the bottle caps are taped, acceptable choices. 3. Sampling plans create (SPcreate) a file that will lookup information from the Sampling Plans Database and the Job Log File (JLF98) A major database used by Sample Managemnet Services for recording more than 100 fields of information.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- OSTI ID:
- 321882
- Report Number(s):
- ESTSC-001298IBMPC00
- Resource Relation:
- Other Information: PBD: 10 Nov 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Environmental Factor(tm) system: RCRA hazardous waste handler information (on cd-rom). Database
Environmental Factor{trademark} system: RCRA hazardous waste handler information