Contaminated waste incinerator modification study. Final report
Technical Report
·
OSTI ID:273032
An explosive waste incinerator (EWI) can be installed in the existing Badger AAP Contaminated Waste Processor (CWP). An engineering evaluation of installing a rotary kiln furnace to dispose of waste energetic material has shown the installation to be possible. An extensive literature search was completed to develop the known proven methods of energetic waste disposal. Current incineration practice including thermal treatment alternatives was investigated. Existing and new equipment was reviewed for adequacy. Current CWP operations and hazardous waste to be disposed of were determined. Comparisons were made with other AAP`s EWI.
- Research Organization:
- Badger Army Ammunition Plant, Baraboo, WI (United States)
- OSTI ID:
- 273032
- Report Number(s):
- AD-A-305778/3/XAB; CNN: Contract DAAA09-85-Z-007; TRN: 62120121
- Resource Relation:
- Other Information: PBD: Aug 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
On-site incineration of contaminated soil: A study into U. S. Navy applications. Master's thesis
Design, permitting, and installation of a waste propellant and explosive incinerator
Development of a simple indicator for measuring the performance of incinerators, industrial furnaces, and boilers burning hazardous waste. Report for October 1989-March 1990
Technical Report
·
Thu Aug 01 00:00:00 EDT 1991
·
OSTI ID:273032
Design, permitting, and installation of a waste propellant and explosive incinerator
Conference
·
Sat Dec 31 00:00:00 EST 1994
·
OSTI ID:273032
Development of a simple indicator for measuring the performance of incinerators, industrial furnaces, and boilers burning hazardous waste. Report for October 1989-March 1990
Technical Report
·
Mon Jan 01 00:00:00 EST 1990
·
OSTI ID:273032
+2 more