skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Vestas V60 - 1.5 MW wind turbine

Conference ·
OSTI ID:269379
 [1]
  1. Vestas Wind Systems, Lem (Denmark)

The development of the large Vestas MW wind turbine began in December, 1992. The design project was {open_quotes}funded{close_quotes} by the EEC and should lead to the building of a prototype to be erected no later than September, 1995. The aim was to design a MW wind turbine competitive with medium size wind turbines (500 kW) on a $/kWh basis. The design is now finished and calculations show that the project has succeeded.

Research Organization:
American Wind Energy Association, Washington, DC (United States)
OSTI ID:
269379
Report Number(s):
CONF-950309-; ON: DE96011159; TRN: 96:003988-0044
Resource Relation:
Conference: 25. annual conference and exhibition on wind power, Washington, DC (United States), 26-30 Mar 1995; Other Information: PBD: 1995; Related Information: Is Part Of Windpower `95 - Proceedings of the American Wind Energy Association; PB: 624 p.
Country of Publication:
United States
Language:
English

Similar Records

The 1.5 MW wind turbine of tomorrow
Conference · Tue Dec 31 00:00:00 EST 1996 · OSTI ID:269379

The Vestas Midwest Model wind turbine
Conference · Fri Sep 01 00:00:00 EDT 1995 · OSTI ID:269379

Green Mountain Power wind power project development: U.S. Department of Energy-EPRI wind turbine verification program. Final report
Technical Report · Mon Dec 01 00:00:00 EST 1997 · OSTI ID:269379