skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Final results for the NNPC area costing and distributed resource study

Technical Report ·
OSTI ID:226965

This paper describes a study to measure the impact of a number of demand side management (DSM) programs and distributed generation (DG) devices on the capacity expansion plans for 13 distribution planning areas (DPAs) in Niagara Mohawks (NMPCs) service territory. The 13 DPAs were selected by regional planners as the areas most likely to require significant reinforcement to alleviate expected load growth over the next ten years. The objectives of this study are: (1) To determine whether local integrated planning can help Niagara Mohawk better position itself for a more competitive future, and (2) to show how DSM/DG can be used to cost-effectively defer local area distribution plans. The areas selected for the study have significant distribution expansions planned over the next ten years to alleviate load growth, but no load growth related transmission expansions. The DSM programs being evaluated cover residential central heating, water heating and air conditioning and commercial heating, air conditioning, and lighting. Also being evaluated are three DG devices: a 0.5 MW battery and two natural gas-fired generator sets (gensets) (1 and 5 MW).

Research Organization:
Electric Power Research Inst. (EPRI), Palo Alto, CA (United States); Barakat and Chamberlin, Inc., Oakland, CA (United States)
OSTI ID:
226965
Report Number(s):
EPRI-TR-105791; CONF-9508115-; TRN: 96:001839-0017
Resource Relation:
Conference: 1. annual distributed resources conference: planning for a competitive market, Kansas City, MO (United States), 29-31 Aug 1995; Other Information: PBD: Dec 1995; Related Information: Is Part Of Distributed resources 1995: Planning for a competitive market. EPRI`s first annual distributed resources conference proceedings; PB: 400 p.
Country of Publication:
United States
Language:
English