Pre-conditioning procedure suitable for internal-RF-antenna of J-PARC RF-driven H{sup −} ion source
- J-PARC Center, Tokai-mura, Naka-gun, Ibaraki-ken 319-1195 (Japan)
The Japan Proton Accelerator Research Complex (J-PARC) cesiated RF-driven H{sup −} ion source has been successfully operated for about 1 yr. By the world brightest level beam, the J-PARC design beam power of 1 MW was successfully demonstrated. Although no internal-RF-antenna failure, except for the once caused by an excess cesium due to a misoperation, occurred in the operation, many antennas failed in pre-conditionings for the first hundred days. The antenna failure rate was drastically decreased by using an antenna with coating thicker than a standard value and the pre-conditioning procedure repeating 15 min 25 kW RF-power operation and impurity-gas evacuation a few times, before the full power (50 kW) operation.
- OSTI ID:
- 22482949
- Journal Information:
- Review of Scientific Instruments, Vol. 87, Issue 2; Other Information: (c) 2015 AIP Publishing LLC; Country of input: International Atomic Energy Agency (IAEA); ISSN 0034-6748
- Country of Publication:
- United States
- Language:
- English
Similar Records
Rod-filter-field optimization of the J-PARC RF-driven H{sup −} ion source
Fine-tuning to minimize emittances of J-PARC RF-driven H{sup −} ion source