Linac cryogenic distribution system maintenance and upgrades at JLab
- Thomas Jefferson National Accelerator Facility (JLab), Newport News, VA 23606 (United States)
The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.
- OSTI ID:
- 22263988
- Journal Information:
- AIP Conference Proceedings, Vol. 1573, Issue 1; Conference: International cryogenic materials conference, Anchorage, AK (United States), 17-21 Jun 2013; Other Information: (c) 2014 AIP Publishing LLC; Country of input: International Atomic Energy Agency (IAEA); ISSN 0094-243X
- Country of Publication:
- United States
- Language:
- English
Similar Records
OVERVIEW AND STATUS OF THE 12 GeV CRYOGENIC SYSTEM UPGRADE AT JLAB
Overview and Status of the 12 GeV Cryogenic System Upgrade At Jlab