Title: Dismantling of Radium-226 Coal Level Gauges: Encountered Problems and How to Solve

Conference ·
OSTI ID:21210773
; ; ; ; ;  [1]
  1. Office of Atoms for Peace (OAP), Vibhavadi Rangsit Road, Chatuchak District, Bangkok 10900 (Thailand)

This paper describes the techniques for dismantling of disused-sealed Radium-226 (Ra-226) coal level gauges which the source specifications and documents were not available, including problems occurred during dismantling stage and the decision making in solving all those obstacles. The 2 mCi (20 pieces), 6 mCi (20 pieces) and 6.6 mCi (30 pieces) of Ra-226 hemi-spherically-shaped with lead-filled coal level gauges were used in industrial applications for electric power generation. All sources needed to be dismantled for further conditioning as requested by the International Atomic Energy Agency (IAEA). One of the 2 mCi Ra-226 source was dismantled under the supervision of IAEA expert. Before conditioning period, each of the 6 mCi and 6.6 mCi sources were dismantled and inspected. It was found that coal level gauges had two different source types: the sealed cylindrical source (diameter 2 cm x 2 cm length) locked with spring in lead housing for 2 mCi and 6.6 mCi; while the 6 mCi was an embedded capsule inside source holder stud assembly in lead-filled housing. Dismantling Ra-226 coal level gauges comprised of 6 operational steps: confirmation of the surface dose rate on each source activity, calculation of working time within the effective occupational dose limit, cutting the weld of lead container by electrical blade, confirmation of the Ra-226 embedded capsule size using radiation scanning technique and gamma radiography, automatic sawing of the source holder stud assembly, and transferring the source to store in lead safe box. The embedded length of 6 mCi Ra-226 capsule in its diameter 2 cm x 14.7 cm length stud assembly was identified, the results from scanning technique and radiographic film revealed the embedded source length of about 2 cm, therefore all the 6 mCi sources were safely cut at 3 cm using the automatic saw. Another occurring problem was one of the 6.6 mCi spring type source stuck inside its housing because the spring was deformed and there was previously a leakage on inner source housing. Thus, during manufacturing the filled-lead for shielding passed through this small hole and fixed the deformed spring together with the source. The circular surface of inner hole was measured and slowly drilled at a diameter 2.2 cm behind shielding, till the spring and the fixed lead sheet were cut, therefore the source could be finally hammered out. The surface dose rate of coal level gauges before weld cutting was 10-15 mR/hr and the highest dose rate at the position of the weld cutter was 2.5 mR/hr. The total time for each weld cutting and automatic sawing was 2-3 minutes and 1 minute, respectively. The source was individually and safely transferred to store in lead safe box using a 1-meter length tong and a light container with 1 meter length handle. The total time for Ra-226 (70 pieces) dismantling, including the encountered problems and their troubles shooting took 4 days operation in which the total dose obtained by 18 operators were ranged from 1-38 {mu}Sv. The dismantling team safely completed the activities within the effective dose limit for occupational exposure of 20 mSv/year (80 {mu}Sv/day). (authors)

Research Organization:
WM Symposia, Inc., PO Box 13023, Tucson, AZ, 85732-3023 (United States)
OSTI ID:
21210773
Report Number(s):
INIS-US-09-WM-06578; TRN: US09V1201081235
Resource Relation:
Conference: Waste Management 2006 Symposium - WM'06 - Global Accomplishments in Environmental and Radioactive Waste Management: Education and Opportunity for the Next Generation of Waste Management Professionals, Tucson, AZ (United States), 26 Feb - 2 Mar 2006; Other Information: Country of input: France; 2 refs
Country of Publication:
United States
Language:
English