skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Cost-effective particulate control options at Potomac Electric Power Company's Dickerson Station: An integrated approach to current and future particulate limits

Conference ·
OSTI ID:20050937

The Dickerson Generating Station evaluated several particulate control options to identify the most cost-effective option. The study's goals were to: eliminate the particulate scrubber and its high maintenance costs, and incorporate flexibility for low-sulfur coal and possible stricter emission limits. Each of the three Dickerson 190 MW units has a small 37-year-old electrostatic precipitator and a wet particulate scrubber. The study evaluated alternatives to replace the scrubber and enhance ESP performance: Existing ESP alternatives--Extend height of existing ESP; Flue gas conditioning. Scrubber stream alternatives--Partial-flow ESP or pulse jet baghouse. Full-flow alternatives--Supplemental ESP; COHPAC baghouse; replacement ESP or baghouse. A technical and economic prescreening eliminated some of the options. Capital, operating, and life cycle costs were estimated for the remaining options to determine the most cost-effective alternative. This paper will present the technical and economic evaluations done for this study, including performance and costs.

Research Organization:
Potomac Electric Power Co. (US)
OSTI ID:
20050937
Report Number(s):
CONF-971214-; TRN: IM200026%%8
Resource Relation:
Conference: 10th International Conference and Exhibition for the Power Generating Industries, Dallas, TX (US), 12/09/1997--12/11/1997; Other Information: PBD: [1998]; Related Information: In: Power-Gen '97 International, [2000] pages.
Country of Publication:
United States
Language:
English