Sacramento Power Authority experience of building and testing a successful turn key combined cycle project
The following paper will describe a combined cycle power plant providing power and steam to a food processing plant. The project owner is Sacramento Power Authority in Sacramento, California, USA. A consortium led by Siemens supplied the equipment and provided the turn key project management. The project was completed in 23 months and the plant was released for dispatch 3 weeks ahead of schedule. The formal performance tests conducted in December 1997, indicated a better net output and a lower net heat rate from the guaranteed values. The thermal acceptance test procedure was in full compliance with the new Performance Test Code PTC-46 of the American Society of Mechanical Engineers (ASME) for combined cycle power plant testing, issued in 1996 and also met all the requirements of ISO 2314 Procedure. The paper will also discuss the performance of an evaporative cooler, used to lower compressor air inlet temperature and the methodology used to reduce the additional instrumentation uncertainty associated with such devices. The paper will also deal with the unique environmental emissions restrictions imposed on the project.
- Research Organization:
- Sacramento Power Authority, CA (US)
- OSTI ID:
- 20018881
- Report Number(s):
- CONF-9806214-; TRN: IM200018%%115
- Resource Relation:
- Conference: Power-Gen Europe'98, Milan (IT), 06/09/1998--06/11/1998; Other Information: 1 CD-ROM. Operating Systems: Windows 3.1, '95, '98 and NT; Macintosh; and UNIX; PBD: [1998]; Related Information: In: Power-gen Europe'98, [2400] pages.
- Country of Publication:
- United States
- Language:
- English