Garden Banks 388 pipeline jumper testing and installation
Conference
·
OSTI ID:160643
- Brown and Root, Inc., Houston, TX (United States)
This paper describes practical aspects of the diverless jumper connection system used to connect Enserch`s two 12-inch pipelines to the subsea template in 2,110 feet water depth. The paper is a follow-on paper to OTC 7543 which describes engineering aspects of the same jumper system. Project costs, schedule, and details of the jumper testing and installation are discussed. Testing was performed to verify jumper design and installation operations. Offshore installation used two measurement methods for verification of jumper geometry.
- OSTI ID:
- 160643
- Report Number(s):
- CONF-950501-; TRN: IM9603%%225
- Resource Relation:
- Conference: 27. offshore technology conference, Houston, TX (United States), 1-4 May 1995; Other Information: PBD: 1995; Related Information: Is Part Of 27. Annual Offshore Technology Conference: 1995 Proceedings. Volume 4: Field drilling and development systems; PB: 688 p.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Garden Banks 388 deepwater pipeline span avoidance
The Garden Banks 388 horizontal tree design and development
Enserch Garden Banks 388 field development template tie-back of existing subsea satellite wells
Conference
·
Sun Dec 31 00:00:00 EST 1995
·
OSTI ID:160643
The Garden Banks 388 horizontal tree design and development
Conference
·
Sun Dec 31 00:00:00 EST 1995
·
OSTI ID:160643
Enserch Garden Banks 388 field development template tie-back of existing subsea satellite wells
Conference
·
Sun Dec 31 00:00:00 EST 1995
·
OSTI ID:160643