Installation and operation of new primary coolers at Clairton works` coke plant
Journal Article
·
· Iron and Steel Engineer
OSTI ID:142365
- Clairton Works, PA (United States). Coking and Environment
- USX Corp., Pittsburgh, PA (United States)
As domestic coke requirement diminished in the 1980`s, Clairton reduced the number of operating batteries to 12 with an effective annual capacity of 4.6 million tons. Replacement of 35 existing shell and tube-type gas coolers with six new direct spray-type coolers is demonstrating that lower outlet temperatures are obtained on a consistent basis, provide preheated feed stream to boilers, as well as being simpler to operate and maintain.
- OSTI ID:
- 142365
- Journal Information:
- Iron and Steel Engineer, Vol. 70, Issue 12; Other Information: PBD: Dec 1993
- Country of Publication:
- United States
- Language:
- English
Similar Records
Principal methods of increasing the level of utilization of fuel and energy resources in the coking industry
Coke oven gas injection to blast furnaces
Clairton B battery: new technology in coke production
Journal Article
·
Thu Jan 01 00:00:00 EST 1981
· Coke Chem. USSR (Engl. Transl.); (United States)
·
OSTI ID:142365
Coke oven gas injection to blast furnaces
Conference
·
Fri Dec 01 00:00:00 EST 1995
·
OSTI ID:142365
+1 more
Clairton B battery: new technology in coke production
Journal Article
·
Mon Aug 01 00:00:00 EDT 1983
· Iron Steel Eng.; (United States)
·
OSTI ID:142365