Title: Fission Product Migration in Primary System and Containment

Version 00 ART MOD2 aims at a comprehensive analysis for the FP behaviour in primary system and in containment during severe accidents and therefore the code considers the removal of radio-nuclides of up to 60 materials including chemical compounds by natural deposition and by the engineered safety features (ESF) such as spray systems. As for the natural deposition of radio-nuclides, the code can consider the phenomena such as gravitational settling, thermophoresis, diffusiophoresis, Brownian diffusion, diffusion under laminar or turbulent flows, resuspension, condensation, chemisorption and revaporization. The code also models the aerosol growth by agglomeration of aerosols and condensation/evaporation of volatile material at the aerosol surface. Recently, the models for iodine chemistry in containment sump water was incorporated into ART MOD2 ART MOD2 was modified in January 2015 to correct coding errors and improve the vibration of the calculation result of water (H2O) vapor.
Publication Date:
OSTI Identifier:
Report Number(s):
ART MOD2; 004588MLTPL00
DOE Contract Number:
Software Revision:
Software Package Number:
Software CPU:
Source Code Available:
Other Software Info:
Owner Installation: Japan Atomic Energy Research Institute Contributors: Japan Atomic Energy Research Institute, Severe Accident Research Laboratory, Department of Reactor Safety Research, Tokai-mura, Naka-gun, Ibaraki-ken, Japan through the OECD Nuclear Energy Agency Data Bank, Issy-les-Moulineaux, France. Equations relating to mass and energy conservation. KEYWORDS: CONTAINMENT, RADIONUCLIDE
Research Org:
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
Sponsoring Org:
Contributing Orgs:
Not Specified
Country of Publication:
United States

To initiate an order for this software, request consultation services, or receive further information, fill out the request form below. You may also reach us by email at: .

ESTSC staff will begin to process an order for scientific and technical software once the payment and signed site license agreement are received. If the forms are not in order, ESTSC will contact you. No further action will be taken until all required information and/or payment is received. Orders are processed within three to five business days.

Software Request