skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: ITER Port Interspace Pressure Calculations

Conference ·
OSTI ID:1261290

The ITER Vacuum Vessel (VV) is equipped with 54 access ports. Each of these ports has an opening in the bioshield that communicates with a dedicated port cell. During Tokamak operation, the bioshield opening must be closed with a concrete plug to shield the radiation coming from the plasma. This port plug separates the port cell into a Port Interspace (between VV closure lid and Port Plug) on the inner side and the Port Cell on the outer side. This paper presents calculations of pressures and temperatures in the ITER (Ref. 1) Port Interspace after a double-ended guillotine break (DEGB) of a pipe of the Tokamak Cooling Water System (TCWS) with high temperature water. It is assumed that this DEGB occurs during the worst possible conditions, which are during water baking operation, with water at a temperature of 523 K (250 C) and at a pressure of 4.4 MPa. These conditions are more severe than during normal Tokamak operation, with the water at 398 K (125 C) and 2 MPa. Two computer codes are employed in these calculations: RELAP5-3D Version 4.2.1 (Ref. 2) to calculate the blowdown releases from the pipe break, and MELCOR, Version 1.8.6 (Ref. 3) to calculate the pressures and temperatures in the Port Interspace. A sensitivity study has been performed to optimize some flow areas.

Research Organization:
Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-00OR22725
OSTI ID:
1261290
Resource Relation:
Conference: 2016 American Nuclear Society, New Orleans, LA, USA, 20160612, 20160616
Country of Publication:
United States
Language:
English

Similar Records

ITER Port Interspace Pressure Calculations
Journal Article · Wed Jun 15 00:00:00 EDT 2016 · Transactions of the American Nuclear Society · OSTI ID:1261290

September 2006 Monthly Report- ITER Visible/IRTV Optical Design Scoping Study
Technical Report · Wed Sep 27 00:00:00 EDT 2006 · OSTI ID:1261290

Drain Tank Information for Developing Design Basis of the Preliminary Design
Technical Report · Wed Feb 01 00:00:00 EST 2012 · OSTI ID:1261290