Enhanced Security-Constrained OPF With Distributed Battery Energy Storage
This paper discusses how fast-response distributed battery energy storage could be used to implement post-contingency corrective control actions. Immediately after a contingency, the injections of distributed batteries could be adjusted to alleviate overloads and reduce flows below their short-term emergency rating. This ensures that the post-contingency system remains stable until the operator has redispatched the generation. Implementing this form of corrective control would allow operators to take advantage of the difference between the short-and long-term ratings of the lines and would therefore increase the available transmission capacity. This problem is formulated as a two-stage, enhanced security-constrained OPF problem, in which the first-stage optimizes the pre-contingency generation dispatch, while the second-stage minimizes the corrective actions for each contingency. Case studies based on a six-bus test system and on the RTS 96 demonstrate that the proposed method provides effective corrective actions and can guarantee operational reliability and economy.
- Sponsoring Organization:
- USDOE Advanced Research Projects Agency - Energy (ARPA-E)
- DOE Contract Number:
- DE-AR0000232
- OSTI ID:
- 1211451
- Journal Information:
- IEEE Transactions on Power Systems, Vol. 30, Issue 1; ISSN 0885-8950
- Country of Publication:
- United States
- Language:
- English
Similar Records
A Fast Decomposition Method to Solve a Security-Constrained Optimal Power Flow (SCOPF) Problem Through Constraint Handling
On Secured Spinning Reserve Deployment of Energy-Limited Resources Against Contingencies