IDC Integrated Master Plan.
This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris
- Research Organization:
- Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE National Nuclear Security Administration (NNSA)
- DOE Contract Number:
- AC04-94AL85000
- OSTI ID:
- 1166647
- Report Number(s):
- SAND2014-20520; 551818
- Country of Publication:
- United States
- Language:
- English
Similar Records
IDC Use Case Model Survey Version 1.0.
IDC System Specification Document Version 1.1.
IDC Use Case Model Survey Version 1.1.
Technical Report
·
Mon Dec 01 00:00:00 EST 2014
·
OSTI ID:1166647
IDC System Specification Document Version 1.1.
Technical Report
·
Sun Feb 01 00:00:00 EST 2015
·
OSTI ID:1166647
IDC Use Case Model Survey Version 1.1.
Technical Report
·
Sun Feb 01 00:00:00 EST 2015
·
OSTI ID:1166647