Longitudinal emittance measurements in the Booster and AGS during the 2014 RHIC gold run
- Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.
This note describes longitudinal emittance measurements that were made in the Booster and AGS during the 2014 RHIC Gold run. It also contains an overview of the longitudinal aspects of their setup during this run. Each bunch intended for RHIC is composed of beam from 4 Booster cycles, and there are two of them per AGS cycle. For each of the 8 Booster cycles required to produce the 2 bunches in the AGS, a beam pulse from EVIS is injected into the Booster and captured in four h=4 buckets. Then those bunches are accelerated to a porch where they are merged into 2 bunches and then into 1 bunch.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States). Relativistic Heavy Ion Collider (RHIC)
- Sponsoring Organization:
- USDOE Office of Science (SC)
- DOE Contract Number:
- AC02-98CH10886
- OSTI ID:
- 1154898
- Report Number(s):
- BNL-105988-2014-IR; BNL-C-A/AP/523; R&D Project: KBCH139; 18032; KB0202011; TRN: US1500117
- Country of Publication:
- United States
- Language:
- English
Similar Records
Simulation of 6 to 3 to 1 merge and squeeze of Au77+ bunches in AGS
Run 16 Tandem gold performance in the injectors and possible improvement with AGS type 6:3:1 bunch merge in the Booster
FY2019 parameters for Gold ions in Booster, AGS, and RHIC
Technical Report
·
Mon May 09 00:00:00 EDT 2016
·
OSTI ID:1154898
Run 16 Tandem gold performance in the injectors and possible improvement with AGS type 6:3:1 bunch merge in the Booster
Technical Report
·
Fri Oct 21 00:00:00 EDT 2016
·
OSTI ID:1154898
FY2019 parameters for Gold ions in Booster, AGS, and RHIC
Technical Report
·
Mon Jul 15 00:00:00 EDT 2019
·
OSTI ID:1154898