Title: Commissioning of helium refrigeration system at JLab for 12 GeV upgrade

The new 4.5 K refrigerator system added to the Jefferson Lab (JLab) Central Helium Liquefier (CHL) for the 12 GeV upgrade will double its previous capacity. It includes a 4.5 K cold box system and compressor system with associated oil removal and gas management systems. At its maximum capacity condition, this new system supports an additional 238 g/s 30 K 1.16 bar cold compressor return flow, a 15 g/s 4.5 K liquefaction load and a 12.6 kW 35–55 K shield load. Five more design conditions, ranging from liquefaction to refrigeration and a stand-by/reduced load state, were specified for the sizing and selection of its components. The cold box system is comprised of a 300–60 K vertical cold box that incorporates a liquid nitrogen pre-cooler and a 60–4.5 K horizontal cold box housing seven turbines that are configured in four expansion stages including one Joule-Thompson expander. The helium compression system has five compressors to support three pressure levels in the cold box. This paper will briefly review the salient 4.5 K system design features and discuss the recent commissioning results.
 [1] ;  [1] ;  [1] ;  [1] ;  [1]
  1. JLAB
Publication Date:
OSTI Identifier:
Report Number(s):
JLAB-ACE-13-1784; DOE/OR/23177-2994
DOE Contract Number:
Resource Type:
Resource Relation:
Journal Name: AIP Conf. Proc.; Journal Volume: 1573; Conference: ADVANCES IN CRYOGENIC ENGINEERING: Transactions of the Cryogenic Engineering Conference - CEC, 17–21 June 2013, Anchorage, Alaska
Research Org:
Thomas Jefferson National Accelerator Facility, Newport News, VA (United States)
Sponsoring Org:
USDOE Office of Science (SC)
Country of Publication:
United States