skip to main content

SciTech ConnectSciTech Connect

Title: 241-AP Tank Farm Construction Extent of Condition Review for Tank Integrity

This report provides the results of an extent of condition construction history review for the 241-AP tank farm. The construction history of the 241-AP tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AP tank farm, the sixth double-shell tank farm constructed, tank bottom flatness, refractory material quality, post-weld stress relieving, and primary tank bottom weld rejection were improved.
; ;
Publication Date:
OSTI Identifier:
Report Number(s):
RPP-RPT-55983 Rev 0
DOE Contract Number:
Resource Type:
Technical Report
Research Org:
Hanford Site (HNF), Richland, WA (United States)
Sponsoring Org:
USDOE Office of Environmental Management (EM)
Contributing Orgs:
Washington River Protection Solutions LLC
Country of Publication:
United States
42 ENGINEERING DST, 241-AP Tank Farm, leak, tank construction, extent of condition