skip to main content

SciTech ConnectSciTech Connect

Title: Final Technical Report

This work is focused on the design and construction of novel beam diagnostic and instrumentation for charged particle accelerators required for the next generation of linear colliders. Our main interest is in non-invasive techniques. The Northwestern group of Velasco has been a member of the CLIC Test Facility 3 (CTF3) collaboration since 2003, and the beam instrumentation work is developed mostly at this facility1. This 4 kW electron beam facility has a 25-170 MeV electron LINAC. CTF3 performed a set of dedicated measurements to finalize the development of our RF-Pickup bunch length detectors. The RF-pickup based on mixers was fully commissioned in 2009 and the RF-pickup based on diodes was finished in time for the 2010-11 data taking. The analysis of all the data taken in by the summer of 2010 was finish in time and presented at the main conference of the year, LINAC 2010 in Japan.
  1. Northwestern University
Publication Date:
OSTI Identifier:
Report Number(s):
CNV0041710; 60012623
DOE Contract Number:
Resource Type:
Technical Report
Research Org:
Northwestern University
Sponsoring Org:
USDOE; USDOE SC Office of High Energy Physics (SC-25)
Contributing Orgs:
Northwestern University
Country of Publication:
United States
72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS instrumentation; beam protection; accelerator technology