skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Upgrade of CEBAF from 6-GeV To 12-GeV: Status

Abstract

The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plants capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

Authors:
Publication Date:
Research Org.:
Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
Sponsoring Org.:
USDOE Office of Science (SC)
OSTI Identifier:
1080171
Report Number(s):
JLAB-PHY-12-1680; DOE/OR/23177-2565
TRN: US1300332
DOE Contract Number:  
AC05-06OR23177
Resource Type:
Conference
Journal Name:
AIP Conf. Proc.
Additional Journal Information:
Journal Volume: 1525; Conference: CAARI 2012, Fort Worth, Texas (United States), 5-10 Aug 2012
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS; accelerator RF systems, cryogenics, electron accelerators, linear accelerators

Citation Formats

Harwood, Leigh H. Upgrade of CEBAF from 6-GeV To 12-GeV: Status. United States: N. p., 2013. Web. doi:10.1063/1.4802397.
Harwood, Leigh H. Upgrade of CEBAF from 6-GeV To 12-GeV: Status. United States. https://doi.org/10.1063/1.4802397
Harwood, Leigh H. 2013. "Upgrade of CEBAF from 6-GeV To 12-GeV: Status". United States. https://doi.org/10.1063/1.4802397.
@article{osti_1080171,
title = {Upgrade of CEBAF from 6-GeV To 12-GeV: Status},
author = {Harwood, Leigh H.},
abstractNote = {The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plants capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.},
doi = {10.1063/1.4802397},
url = {https://www.osti.gov/biblio/1080171}, journal = {AIP Conf. Proc.},
number = ,
volume = 1525,
place = {United States},
year = {Mon Apr 01 00:00:00 EDT 2013},
month = {Mon Apr 01 00:00:00 EDT 2013}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: