Control system retrofit guidelines. Volume 2: Technical assessment, Final report
- Black and Veatch, Kansas City, MO (United States)
This report has been prepared by Black & Veatch for the Electric Power Research Institute under Contract RP2710-16. This project has been a part of an EPRI program to enhance computer and control technology applications for the utility industry. It is estimated that the utility industry will spend 500 million dollars in the next two years for control system enhancement projects. The need for such enhancement results from a combination of the age and obsolescence of the control systems in existing fossil-fired plants, the decision by utilities to extend the lifetime of those plants, the changes in operating strategies, and the continued development of control systems with expanded capabilities. Opportunities for control system retrofits are myriad; therefore, utilities are faced with complex decisions as to how best to use the limited financial resources available for such projects. To assist utilities in making these decisions, the Electric Power Research Institute (EPRI) has retained Black & Veatch and Sargent & Lundy to develop a set of control system retrofit guideline documents. The guidelines are in a three-volume format. Volume I--Control System Retrofit Project Methodology; Volume II--Control System Technical Assessment; and Volume III--Utility Case Studies. Volume II (this document) gives guidance in the technical assessment for a retrofit, and has been prepared by Black & Veatch under EPRI RP2710-16. The combination of these guideline documents gives utilities the necessary guidance to perform a retrofit project in a straightforward, cost-effective manner.
- Research Organization:
- Electric Power Research Inst., Palo Alto, CA (United States); Black and Veatch, Kansas City, MO (United States)
- Sponsoring Organization:
- Electric Power Research Inst., Palo Alto, CA (United States)
- OSTI ID:
- 10174247
- Report Number(s):
- EPRI-TR-100343-Vol.2; ON: UN92040174
- Resource Relation:
- Other Information: PBD: Jul 1992
- Country of Publication:
- United States
- Language:
- English
Similar Records
GUIDANCE FOR NUCLEAR POWER PLANT CONTROL ROOM AND HUMAN-SYSTEM INTERFACE MODERNIZATION
Benefits of Digital Equipment Generic Qualification Activities