Statistical process control program at a ceramics vendor facility. Final report
Technical Report
·
OSTI ID:10117997
Development of a statistical process control (SPC) program at a ceramics vendor location was deemed necessary to improve product quality, reduce manufacturing flowtime, and reduce quality costs borne by AlliedSignal Inc., Kansas City Division (KCD), and the vendor. Because of the lack of available KCD manpower and the required time schedule for the project, it was necessary for the SPC program to be implemented by an external contractor. Approximately a year after the program had been installed, the original baseline was reviewed so that the success of the project could be determined.
- Research Organization:
- Allied-Signal Aerospace Co., Kansas City, MO (United States). Kansas City Div.
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC04-76DP00613
- OSTI ID:
- 10117997
- Report Number(s):
- KCP-613-4866; ON: DE93006043
- Resource Relation:
- Other Information: PBD: Dec 1992
- Country of Publication:
- United States
- Language:
- English
Similar Records
Statistical process control program at a ceramics vendor facility
Pollution prevention through total quality
MAST 1 purchased products--components. Final report
Technical Report
·
Tue Dec 01 00:00:00 EST 1992
·
OSTI ID:10117997
Pollution prevention through total quality
Conference
·
Sat May 01 00:00:00 EDT 1993
·
OSTI ID:10117997
+2 more
MAST 1 purchased products--components. Final report
Technical Report
·
Sun Oct 01 00:00:00 EDT 1995
·
OSTI ID:10117997