skip to main content

DOE PAGESDOE PAGES

Title: Development of the beam extraction synchronization system at the Fermilab Booster

The new beam extraction synchronization control system called “Magnetic Cogging” was developed at the Fermilab Booster and it replaces a system called “RF Cogging” as part of the Proton Improvement Plan (PIP). [1] The flux throughput goal for the PIP is 2.2×1017 protons per hour, which is double the present flux. Thus, the flux increase will be accomplished by doubling the number of beam cycles which, in turn, will double the beam loss in the Booster accelerator if nothing else is done.
Authors:
 [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1]
  1. Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Publication Date:
OSTI Identifier:
1235043
Report Number(s):
FERMILAB-PUB--15-536-AD
Journal ID: ISSN 0168-9002
Grant/Contract Number:
AC02-07CH11359
Type:
Accepted Manuscript
Journal Name:
Nuclear Instruments and Methods in Physics Research. Section A, Accelerators, Spectrometers, Detectors and Associated Equipment
Additional Journal Information:
Journal Volume: 799; Journal Issue: C; Journal ID: ISSN 0168-9002
Publisher:
Elsevier
Research Org:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Org:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
Country of Publication:
United States
Language:
English
Subject:
46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND TECHNOLOGY longitudinal dynamics; RF; corrector magnets; feedback