Powered by Deep Web Technologies
Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

General Service LED Lamps | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DOE SSL technology fact sheet that compares general service LED light bulbs with incandescent and CFL bulbs. ledgeneral-service-lamps.pdf More Documents & Publications LED...

2

General service incandescent lamp with improved efficiency  

SciTech Connect

A high efficiency general service incandescent lamp is disclosed. The disclosed improved general service incandescent lamp has an outer and an inner envelope. The inner envelope has a relatively small housing containing a halogen gas and a relatively high pressure efficient fill-gas and in which a low voltage filament is spatially disposed therein.

Berlec, I.

1985-06-18T23:59:59.000Z

3

DOE Publishes Notice of Public Meeting and Availability of the Framework Document for General Service Lamps Energy Conservation Standards  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy has published a Federal Register notice of public meeting and availability of the framework document regarding energy conservation standards for general service lamps.

4

2014-12-30 Issuance: Energy Conservation Standard for General Service Fluorescent Lamps and Incandescent Reflector Lamps; Final Rule  

Energy.gov (U.S. Department of Energy (DOE))

This document is a pre-publication Federal Register final rule regarding energy conservation standards for general service fluorescent lamps and incandescent reflector lamps, as issued by the Deputy Assistant Secretary for Energy Efficiency on December 30, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

5

2015-01-26 Issuance: Energy Conservation Standards for General Service Lamps; Extension of Public Comment Period  

Energy.gov (U.S. Department of Energy (DOE))

This document is a pre-publication Federal Register extension of comment period regarding energy conservation standards for general service lamps, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 26, 2015. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

6

2014-12-05 Issuance: Energy Conservation Standard for General Service Lamps; Notice of Public Meeting and Availability of the Preliminary Technical Support Document  

Energy.gov (U.S. Department of Energy (DOE))

This document is a pre-publication Federal Register notice of public meeting and availability of the preliminary technical support document regarding energy conservation standards for general service lamps, as issued by the Deputy Assistant Secretary for Energy Efficiency on December 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

7

Federal Energy Management Program: General Services Administration -  

NLE Websites -- All DOE Office Websites (Extended Search)

General Services General Services Administration - Suitland, Maryland to someone by E-mail Share Federal Energy Management Program: General Services Administration - Suitland, Maryland on Facebook Tweet about Federal Energy Management Program: General Services Administration - Suitland, Maryland on Twitter Bookmark Federal Energy Management Program: General Services Administration - Suitland, Maryland on Google Bookmark Federal Energy Management Program: General Services Administration - Suitland, Maryland on Delicious Rank Federal Energy Management Program: General Services Administration - Suitland, Maryland on Digg Find More places to share Federal Energy Management Program: General Services Administration - Suitland, Maryland on AddThis.com... Energy-Efficient Products

8

Retail Replacement Lamps  

Energy.gov (U.S. Department of Energy (DOE))

Annual CALiPER testing of A19, G25, candelabra, night light, MR16/PAR16, PAR20, and PAR30 replacement lamps – purchased directly from store shelves – offers insights on performance trends from year to year. The report findings offer valuable insights for manufacturers and retailers alike.

9

Lamp Divisions  

Office of Legacy Management (LM)

--- --- /A;; i :' r%i;in~house ilEc;' i:Z3:~cra:ion Lamp Divisions , _.. (I +i. 0 :,,,rg. . I . . -= i?e p/q! qe)-' &se pw E.rcale?l iev, Je!sey 07m March 20, 1 gs? ::r . J. A. Jones I ti. 5. Muclear Regulatory Commission .> = ..- haterials Licensing Branch -s - ,.I, - - Division of Fuel Cycle and hateri al Safety LY. , $2 - _ . ' -' . 3 _- - Yeshington, C. C. 2@555 - :_ :--, =-- -- .-?J -.: y...., : :- 7 Dear Mr. Jones : y-- --, ? . *I 2=15 2 r; X -P The following is our final report of the decontamination efZor?s takz in our Bui Iding 7 basement and wi 11 also serve to update our report i& November 12, 1980. As stated in NRC' s report of December 22, 1983, two closeout inspect ions were conducted by your King of Prussia off i ce on November 21 and December 2,

10

General Services Administration Photovoltaics Project in Sacramento, California  

Energy.gov (U.S. Department of Energy (DOE))

Document describes a request for proposal issued for the General Services Administration photovoltaic (PV) project.

11

Policy Flash 2013-29 Leveraging the General Services Administration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

General Services Administration's SmartPay2 Program and its Single Use Account Feature Policy Flash 2013-29 Leveraging the General Services Administration's SmartPay2 Program and...

12

DuraLamp USA: Proposed Penalty (2010-CE-0912) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DuraLamp USA: Proposed Penalty (2010-CE-0912) DuraLamp USA: Proposed Penalty (2010-CE-0912) DuraLamp USA: Proposed Penalty (2010-CE-0912) September 9, 2010 DOE alleged in a Notice of Proposed Civil Penalty that DuraLamp USA, Inc. failed to certify a variety of general service fluorescent lamps as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. DuraLamp USA: Proposed Penalty (2010-CE-0912) More Documents & Publications DuraLamp USA: Order (2010-CE-0912)

13

Turning on LAMP  

ScienceCinema (OSTI)

Christoph Bostedt, a senior staff scientist at SLAC's Linac Coherent Light Source X-ray laser, provides a sneak peek of a powerful new instrument, called LAMP, that is now available for experiments that probe the atomic and molecular realm. LAMP replaces and updates the first instrument at LCLS, dubbed CAMP, which will be installed at an X-ray laser in Germany.

Bostedt, Christoph

2014-07-16T23:59:59.000Z

14

Turning on LAMP  

SciTech Connect

Christoph Bostedt, a senior staff scientist at SLAC's Linac Coherent Light Source X-ray laser, provides a sneak peek of a powerful new instrument, called LAMP, that is now available for experiments that probe the atomic and molecular realm. LAMP replaces and updates the first instrument at LCLS, dubbed CAMP, which will be installed at an X-ray laser in Germany.

Bostedt, Christoph

2014-06-30T23:59:59.000Z

15

Fluorescent Tube Lamps  

Energy.gov (U.S. Department of Energy (DOE))

FEMP temporarily suspended its energy efficiency requirements for fluorescent tube lamps as it evaluates the market impact of the pending 2012 minimum efficiency standards for fluorescent lamps. The program will issue updated energy efficiency requirements when the market distribution of this product category stabilizes and when doing so has the potential to result in significant Federal energy savings.

16

Compact fluorescent lamp applications in luxury hotels  

SciTech Connect

Over the past several years, consumers, lighting designers, and energy conservationists have paid increasing attention to the special characteristics of compact fluorescent lamps (CFLs). CFLs can typically be used to replace incandescent lamps of three to four times their own wattage, and their color rendering indices (CRIs)-80 to 85-make them virtually indistinguishable from incandescents. The typical 10,0000-hour life of a CFL often makes savings in labor its most desirable feature when compared to a shorter-lived incandescent lamp.

Gilleskie, R.J.

1996-01-01T23:59:59.000Z

17

Policy Flash 2013-29 Leveraging the General Services Administration's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Leveraging the General Services 9 Leveraging the General Services Administration's SmartPay2 Program and its Single Use Account Feature Policy Flash 2013-29 Leveraging the General Services Administration's SmartPay2 Program and its Single Use Account Feature Attached is Policy Flash 2013-29: Leveraging the General Services Administration's SmartPay2 Program and its Single Use Account Feature Questions concerning this policy flash should be directed to Denise T. Clarke of the Office of Acquisition and Project Management, Strategic Programs Division at (202) 287-1748 or at DeniseT.Clarke@hq.doe.gov. POLICY_FLASH_2013_28 Leveraging GSA SmartPay2.pdf Signed_Memo with_ attachments.pdf More Documents & Publications Policy Flash 2013-50 Leveraging the General Services Administration's SmartPay2 Program and its Single Use Account Feature

18

Magnetic fluorescent lamp  

DOE Patents (OSTI)

The radiant emission of a mercury-argon discharge in a fluorescent lamp assembly is enhanced by providing means for establishing a magnetic field with lines of force along the path of electron flow through the bulb of the lamp assembly, to provide Zeeman splitting of the ultraviolet spectral line. Optimum results are obtained when the magnetic field strength causes a Zeeman splitting of approximately 1.7 times the thermal line width.

Berman, S.M.; Richardson R.W.

1983-12-29T23:59:59.000Z

19

General Services Administration - Suitland, Maryland | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

General Services Administration - Suitland, Maryland General Services Administration - Suitland, Maryland General Services Administration - Suitland, Maryland October 7, 2013 - 9:55am Addthis Photo of Suitland Federal Center The Suitland Federal Center, five miles east of Washington, D.C. installed a photovoltaic (PV) system that was as part of President Clinton's "Million Solar Roofs" initiative. The General Services Administration (GSA) paid for the installation with help from the U.S. Department of Energy (DOE) through the Solar Electric Power Association TEAM-UP program. The installation site was a former cooling pond (like a swimming pool, 7 ft. deep and 320 ft. in diameter) that had been filled with soil, then compacted and graded. A total of almost 2,300 linear ft. of photovoltaic array structure, divided into 80-ft. bays, had to fit into an area just

20

CALiPER Retail Lamps Study 3  

SciTech Connect

The CALiPER program first began investigating LED lamps sold at retail stores in 2010, purchasing 33 products from eight retailers and covering six product categories. The findings revealed a fragmented marketplace, with large disparities in performance of different products, accuracy of manufacturer claims, and offerings from different retail outlets. Although there were some good products, looking back many would not be considered viable competitors to other available options, with too little lumen output, not high enough efficacy, or poor color quality. CALiPER took another look in late 2011purchasing 38 products of five different types from nine retailers and the improvement was marked. Performance was up; retailer claims were more accurate; and the price per lumen and price per unit efficacy were down, although the price per product had not changed much. Nonetheless, there was still plenty of room for improvement, with the performance of LED lamps not yet reaching that of well-established classes of conventional lamps (e.g., 75 W incandescent A19 lamps). Since the second retail lamp study was published in early 2012, there has been substantial progress in all aspects of LED lamps available from retailers. To document this progress, CALiPER again purchased a sample of lamps from retail stores 46 products in total, focusing on A19, PAR30, and MR16 lamps but instead of a random sample, sought to select products to answer specific hypotheses about performance. These hypotheses focused on expanding ranges of LED equivalency, the accuracy of lifetime claims, efficacy and price trends, as well as changes to product designs. Among other results, key findings include: There are now very good LED options to compete with 60 W, 75 W, and 100 W incandescent A19 lamps, and 75 W halogen PAR30 lamps. MR16 lamps have shown less progress, but there are now acceptable alternatives to 35 W, 12 V halogen MR16 lamps and 50 W, 120 V halogen MR16 lamps for some applications. Other uses, such as in enclosed luminaires, may require more development. At the same price point, lamps purchased in 2013 tended to have higher output and slightly higher efficacy than in 2011 or 2010. Over 30% of the products purchased in 2013 exceeded the maximum efficacy measured in 2011 (71 lm/W), with the most efficacious product measured at 105 lm/W. There appears to be increasing consistency in color quality, with a vast majority of products having a CCT of 2700 K or 3000 K and a CRI between 80 and 85. There were also fewer poor performing products tested and more high-performing products available in 2013 than in previous years. The accuracy of equivalency and performance claims was better than in 2011, but remains a concern, with 43% of tested products failing to completely meet their equivalency claim and 20% of products failing to match the manufacturer’s performance data. Although progress has been substantial, on average LED lamps remain more expensive than other energy efficiency lighting technologies -- although some aspects can be superior. Although not universal to all product lines or all product types, the issue of insufficient lumen output from LED lamps is waning. Thus, manufacturers can focus on other issues, such as reducing cost, improving electrical/dimmer compatibility, eliminating flicker, or improving color quality. While these issues are not inherent to all products, they remain a concern for the broader market.

Royer, Michael P.; Beeson, Tracy A.

2014-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Energy-efficient incandescent lamp: Final report  

E-Print Network (OSTI)

of Energy Conserving Incandescent Lamps", J . Brett, R.July 1981. "Filaments for Incandescent Lamps with Radiation20-22 "Energy Saving Incandescent Lamps with Infrared

Verderber, R.

2010-01-01T23:59:59.000Z

22

LED MR16 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

The following CALiPER report provides detailed analysis of LED MR16 lamp performance, covering basic performance characteristics as well as subjective evaluation of beam, shadow, and color quality. Pending reports will offer analysis on performance attributes that are not captured by LM-79 testing. These reports are intended to educate the industry on market trends, potential issues, and important areas for improvement.

23

LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

The following CALiPER reports provide detailed analysis of LED PAR38 lamp performance, covering basic performance characteristics as well as subjective evaluation of beam, shadow, and color quality. Pending reports will offer analysis on flicker, dimming and power quality characteristics; stress testing; and lumen and chromaticity maintenance. These reports are intended to educate the industry on market trends, potential issues, and important areas for improvement.

24

L Prize Competition Winner 60W Incandesent Replacement Lamp Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Deployment Technology Deployment Working Group L Prize ® Competition Winner 60W Incandescent Replacement Lamp Update James E. Rannels, Senior Advisor L Prize Competition D&R International May 23, 2012 Philips Wins First L Prize 2 * August 3, 2011: Philips announced as winner of 60W replacement bulb category * Product distributed thru commercial and retail channels Image courtesy of Philips -...[O]nce an award is made the authorizing Act directs General Services Administration to develop federal purchasing schedules for solid-state lamps that meet or exceed the specifications laid out in the prize category-so long as it is cost effective. I hope the GSA begins this process soon.‖

25

DOE Publishes CALiPER Report on Cost-Effectiveness of Linear (T8) LED Lamps  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy's CALiPER program has released Report 21.3, which is part of a series of investigations on linear LED lamps. Report 21.3 details a set of life-cycle cost simulations that compared a two-lamp troffer using LED lamps (38W total power draw) or fluorescent lamps (51W total power draw) over a 10-year study period.

26

DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14 Federal Register / Vol. 75, No. 130 /Thursday, July 8, 2010 /Rules and Regulations 14 Federal Register / Vol. 75, No. 130 /Thursday, July 8, 2010 /Rules and Regulations DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 48 CFR Chapter 1 [Docket FAR-20104076, Sequence 61 Federal Acquisition Regulation; Federal Acquisition Circular 2005-44; Introduction AGENCY: Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space DATES:, For effective date, see separate Administration INASAI. document, which follows. ACTION: Summary presentation of an interim rule. SUMMARY: This document summarizes the Federal Acquisition Regulation (FAR) rule agreed to by the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council in this Federal Acquisition

27

Max Tech and Beyond: Fluorescent Lamps  

E-Print Network (OSTI)

Fluorescent Lamps and Incandescent Reflector Lamps; Finalmany end- use applications. Incandescent Outdoor Stationaryof color compared with the incandescent reference source is

Scholand, Michael

2012-01-01T23:59:59.000Z

28

Energy Cost Calculator for Compact Fluorescent Lamps | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

project. Modify the default values to suit your project requirements. Existing incandescent lamp wattage Watts Incandescent lamp cost dollars Incandescent lamp life 1000 hours...

29

Health Implications of New Lamp Technology Progress with Lamp Safety  

E-Print Network (OSTI)

: ­ ACGIH Threshold Limit Values, UV, lasers, etc. ­ ANSI Z136.1 for lasers with MPEs 0.1 ps -30 ks ­ ANSI RP 27.1 to ANSI RP 27.3 Lamp Safety · Internationally: ­ International Commission on Non

California at Davis, University of

30

Capacitive sensing with a fluorescent lamp  

E-Print Network (OSTI)

This work presents a modified fluorescent lamp that can be used as a capacitive sensing system. The lamp sensor measures changes in the electric fields emitted from the fluorescent bulbs in order to deduce the presence and ...

Cooley, John Jacob

2007-01-01T23:59:59.000Z

31

LED Linear Lamps and Troffer Lighting  

Energy.gov (U.S. Department of Energy (DOE))

The CALiPER program performed a series of investigations on linear LED lamps. Each report in the series covers the performance of up to 31 linear LED lamps, which were purchased in late 2012 or 2013. The first report focuses on bare lamp performance of LED T8 replacement lamps and subsequent reports examine performance in various troffers, as well as cost-effectiveness. There is also a concise guidance document that describes the findings of the Series 21 studies and provides practical advice to manufacturers, specifiers, and consumers (Report 21.4: Summary of Linear (T8) LED Lamp Testing , 5 pages, June 2014).

32

The evolving price of household LED lamps: Recent trends and historical comparisons for the US market  

SciTech Connect

In recent years, household LED light bulbs (LED A lamps) have undergone a dramatic price decline. Since late 2011, we have been collecting data, on a weekly basis, for retail offerings of LED A lamps on the Internet. The resulting data set allows us to track the recent price decline in detail. LED A lamp prices declined roughly exponentially with time in 2011-2014, with decline rates of 28percent to 44percent per year depending on lumen output, and with higher-lumen lamps exhibiting more rapid price declines. By combining the Internet price data with publicly available lamp shipments indices for the US market, it is also possible to correlate LED A lamp prices against cumulative production, yielding an experience curve for LED A lamps. In 2012-2013, LED A lamp prices declined by 20-25percent for each doubling in cumulative shipments. Similar analysis of historical data for other lighting technologies reveals that LED prices have fallen significantly more rapidly with cumulative production than did their technological predecessors, which exhibited a historical decline of 14-15percent per doubling of production.

Gerke, Brian F.; Ngo, Allison T.; Alstone, Andrea L.; Fisseha, Kibret S.

2014-10-14T23:59:59.000Z

33

Analysis of Minimum Efficiency Performance Standards for Residential General Service Lighting in Chile  

E-Print Network (OSTI)

phasing out the use of incandescent lamps. Following majorproposed phase out of incandescent bulbs in Chile. 2 Lifeless energy: here incandescent lights (IL) are evaluated

Letschert, Virginie E.

2012-01-01T23:59:59.000Z

34

A light diet for a giant appetite: An assessment of China's proposed fluorescent lamp standard  

SciTech Connect

Lighting has been one of the fastest growing electric end-uses in China over the last twenty years, with an average annual growth rate of 14%. Fluorescent lighting provides a significant portion of China's lighting need. In 1998, China produced 680 million fluorescent lamps, of which 420 million were linear fluorescent lamps of various diameters (T8 to T12). There are substantial variations both in energy efficiency and lighting performance among locally produced fluorescent lamps. Such variations present a perfect opportunity for policy intervention through efficiency standards to promote the adoption of more efficient fluorescent lamps in China. This paper analyzes China's proposed minimum efficiency standard for fluorescent lamps and presents an assessment of its likely impacts on China's lighting energy consumption and GHG emissions.

Lin, Jiang

2002-04-11T23:59:59.000Z

35

Max Tech and Beyond: Fluorescent Lamps  

E-Print Network (OSTI)

varies by watts of power per foot of electrical arc in theFoot Linear Fluorescent Lamps Efficacy Life Lumens Type Base Power

Scholand, Michael

2012-01-01T23:59:59.000Z

36

Covered Product Category: Compact Fluorescent Lamps  

Energy.gov (U.S. Department of Energy (DOE))

FEMP provides acquisition guidance across a variety of product categories, including compact fluorescent lamps (CFLs), which are an ENERGY STAR-qualified product category.

37

Energy saving controller for fluorescent lamps.  

E-Print Network (OSTI)

??Although fluorescent lamp is a very efficient lighting device in daily life, still the high harmonic distortion and low power factor cause unnecessary energy consumption.… (more)

Cheong, Zhi Xiong

2010-01-01T23:59:59.000Z

38

LED Replacements for Linear Fluorescent Lamps Webcast  

Energy.gov (U.S. Department of Energy (DOE))

In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting...

39

Energy conservation treatment in Exxon's “the lamp  

Science Journals Connector (OSTI)

In this article, Mary Ann Ferguson-DeThorne examines The Lamp, a publication sponsored by Exxon, to determine when and to what extent Exxon informed The Lamp's audience about an impending energy shortage and possible energy conservation methods, to learn if The Lamp's energy conservation messages reflected Exxon's stated conservation positions, and to compare The Lamp to mass-circulation news magazines in terms of how well it alerted its audience to the impending energy shortage. The crucial period of study here is 1971–1973; prior to the Arab oil boycott and the 1974 Congressional investigation of charges that the large oil companies had contrived shortages to eliminate competition.

Mary Ann Ferguson-DeThorne

1978-01-01T23:59:59.000Z

40

The general Service raet PG for Xcel energy in denver is not...  

Open Energy Info (EERE)

The general Service raet PG for Xcel energy in denver is not included Home > Groups > Utility Rate Submitted by Er on 26 January, 2014 - 21:14 1 answer Points: 0 I think this is...

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

U.S. General Services Administration - Form SF299 | Open Energy...  

Open Energy Info (EERE)

Administration - Form SF299 Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: U.S. General Services Administration - Form SF299 Abstract This form is an...

42

DOE Publishes New CALiPER Report on Subjective Evaluation of LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

DOE has published the first in a series of four special investigations intended to extend the findings of CALiPER Application Summary Report 20: LED PAR38 Lamps, which was published late last year.

43

A SPICE Compatible Model of High Intensity Discharge Lamps  

E-Print Network (OSTI)

from the arc's * Corresponding author behavior of HID lamps. This model are derived from the arc-linear resistance of the lamp, is the global specific conductance of the plasma, V is the volume of the plasma, L is the length of plasma and S is the cross section. ~ Vin G1 Lamp Model Ballast v(lamp) i(lamp) Analytical

44

Portable lamp with dynamically controlled lighting distribution  

DOE Patents (OSTI)

A double lamp table or floor lamp lighting system has a pair of compact fluorescent lamps (CFLs) arranged vertically with a reflective septum in between. By selectively turning on one or both of the CFLs, down lighting, up lighting, or both up and down lighting is produced. The control system can also vary the light intensity from each CFL. The reflective septum insures that almost all the light produced by each lamp will be directed into the desired light distribution pattern which is selected and easily changed by the user. Planar compact fluorescent lamps, e.g. circular CFLs, particularly oriented horizontally, are preferable. CFLs provide energy efficiency. The lighting system may be designed for the home, hospitality, office or other environments.

Siminovitch, Michael J. (Pinole, CA); Page, Erik R. (Berkeley, CA)

2001-01-01T23:59:59.000Z

45

LED T8 Replacement Lamps | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

T8 Replacement Lamps LED T8 Replacement Lamps This documents provides an overview of LED T8 replacement lamps and helps define a reasonable minimum performance level for the...

46

Solid-state lamp with integral occupancy sensor  

E-Print Network (OSTI)

Previous work demonstrated a retrofit proximity detector for fluorescent lamps using the lamp's own stray electric fields. This paper extends the retrofit sensor system to a solid-state (LED) lamp. The design and implementation ...

Cooley, John J.

47

COST EFFECTIVENESS OF LONG LIFE INCANDESCENT LAMPS AND ENERGY BUTTONS  

E-Print Network (OSTI)

as any 1ong-li incandescent lamp or system evaluated in thisEFFECTIVENESS OF LONG LIFE INCANDESCENT LAMPS AND ENERGYEFFECTIVENESS OF LONG LIFE INCANDESCENT LAMPS AND ENERGY

Verderber, Rudy

2013-01-01T23:59:59.000Z

48

DuraLamp USA: Order (2010-CE-0912)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered DuraLamp USA, Inc. to pay a $2,500 civil penalty after finding DuraLamp USA had failed to certify that model PAR 30, an incandescent reflector lamp, complies with the applicable energy conservation standards.

49

Tungsten wire for incandescent lamps  

SciTech Connect

Tungsten wire for incandescent lamp filaments must operate at high temperatures and for long times. To meet these requirements, the grain morphology of the wire must be controlled to reduce the propensity for grain boundary sliding. The morphology is a function of the distribution of very small pockets of potassium in the wire and the mechanical processing from ingot to wire. The behavior of the filament is directly related to the grain morphology. This paper describes the mechanism by which the potassium is incorporated into and distributed in the ingot. The elongation and spheroidization of the bubbles during hot rolling and swaging is also examined and related to the grain morphology of wire. Some indications of the relationship between grain morphology and filament behavior are also given.

Walter, J.L.; Briant, C.L. (General Electric Corporate Research and Development, Schenectady, NY (USA))

1990-09-01T23:59:59.000Z

50

Power factor and harmonic distortion characteristics of energy efficient lamps  

SciTech Connect

This paper evaluates the performance of a new class of lamps which are generally classified as the energy-saving lamps. It is shown that, when compared with the incandescent lamps, these lamps indeed consume less real power and have higher relative illumination. However, the energy-saving lamps operate at a low power factor and produce current distortion which are much higher than the distortion produced by the traditional incandescent lamps.

Etezadi-Amoli, M.; Florence, T.

1989-07-01T23:59:59.000Z

51

CALiPER Report 21.3: Cost-Effectiveness of Linear (T8) LED Lamps  

SciTech Connect

Meeting performance expectations is important for driving adoption of linear LED lamps, but cost-effectiveness may be an overriding factor in many cases. Linear LED lamps cost more initially than fluorescent lamps, but energy and maintenance savings may mean that the life-cycle cost is lower. This report details a series of life-cycle cost simulations that compared a two-lamp troffer using LED lamps (38 W total power draw) or fluorescent lamps (51 W total power draw) over a 10-year study period. Variables included LED system cost ($40, $80, or $120), annual operating hours (2,000 hours or 4,000 hours), LED installation time (15 minutes or 30 minutes), and melded electricity rate ($0.06/kWh, $0.12/kWh, $0.18/kWh, or $0.24/kWh). A full factorial of simulations allows users to interpolate between these values to aid in making rough estimates of economic feasibility for their own projects. In general, while their initial cost premium remains high, linear LED lamps are more likely to be cost-effective when electric utility rates are higher than average and hours of operation are long, and if their installation time is shorter.

Miller, Naomi J.; Perrin, Tess E.; Royer, Michael P.

2014-05-27T23:59:59.000Z

52

Cost effectiveness of long life incandescent lamps and energy buttons  

SciTech Connect

Long-life replacement lamps for the incandescent lamp have been evaluated with regard to their cost effectiveness. The replacements include the use of energy buttons that extend lamp life as well as an adaptive fluorescent circline lamp that will fit into existing incandescent lamp sockets. The initial, operating, and replacement costs for one million lumen hours are determined for each lamp system. It is found that the most important component lighting cost is the operating cost. Using lamps that are less efficient or devices that cause lamps to operate less efficiently are not cost-effective. The adaptive fluorescent circline lamp, even at an initial unit cost of $20.00, is the most cost-effective source of illumination compared to the incandescent lamp and lamp systems examined.

Verderber, R.; Morse, O.

1980-04-07T23:59:59.000Z

53

Lamp system for uniform semiconductor wafer heating  

DOE Patents (OSTI)

A lamp system with a very soft high-intensity output is provided over a large area by water cooling a long-arc lamp inside a diffuse reflector of polytetrafluorethylene (PTFE) and titanium dioxide (TiO.sub.2) white pigment. The water is kept clean and pure by a one micron particulate filter and an activated charcoal/ultraviolet irradiation system that circulates and de-ionizes and biologically sterilizes the coolant water at all times, even when the long-arc lamp is off.

Zapata, Luis E. (Livermore, CA); Hackel, Lloyd (Livermore, CA)

2001-01-01T23:59:59.000Z

54

Strategic Energy Management Plan: General Services Administration, Region 10, Northwest/Arctic Region  

NLE Websites -- All DOE Office Websites (Extended Search)

the mission of the General Services the mission of the General Services Administration is to help federal agencies better serve the public by offering, at best value, superior workplaces and expert solutions, acquisition services, and management policies. our vision as staff of GSA's Northwest/Arctic Region is to serve as strategic real estate advisors who provide superior, sustainable workspace solutions that exceed customer expectations, enhance worker productivity, and reflect our understanding of client needs while providing environmental leadership within the communities we serve. our core values are "SAIL ON" which stands for Support, Accountability, Integrity, Loyalty and trust, Ownership/commitment, and Nurture a fun workplace. i table of contents

55

LED lamp power management system and method  

DOE Patents (OSTI)

An LED lamp power management system and method including an LED lamp having an LED controller 58; a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 reduces power loss in one of the channel switch 62 and the shunt switch 68 when LED lamp electronics power loss (P.sub.loss) exceeds an LED lamp electronics power loss limit (P.sub.lim); and each of the channel switches 62 receives a channel switch control signal 63 from the LED controller 58 and each of the shunt switches 68 receives a shunt switch control signal 69 from the LED controller 58.

Gaines, James; Clauberg, Bernd; Van Erp, Josephus A. M.

2013-03-19T23:59:59.000Z

56

MagLab - Arc Lamp Tutorial  

NLE Websites -- All DOE Office Websites (Extended Search)

with 2,000 cells to create an arc across a 4-inch (100 millimeter) gap. When suitable electric generators became available in the late 1870s, the practical use of arc lamps began....

57

Building Technologies Office: Fluorescent and Incandescent Lamps Public  

NLE Websites -- All DOE Office Websites (Extended Search)

Fluorescent and Fluorescent and Incandescent Lamps Public Meeting to someone by E-mail Share Building Technologies Office: Fluorescent and Incandescent Lamps Public Meeting on Facebook Tweet about Building Technologies Office: Fluorescent and Incandescent Lamps Public Meeting on Twitter Bookmark Building Technologies Office: Fluorescent and Incandescent Lamps Public Meeting on Google Bookmark Building Technologies Office: Fluorescent and Incandescent Lamps Public Meeting on Delicious Rank Building Technologies Office: Fluorescent and Incandescent Lamps Public Meeting on Digg Find More places to share Building Technologies Office: Fluorescent and Incandescent Lamps Public Meeting on AddThis.com... About Standards & Test Procedures Implementation, Certification & Enforcement

58

Retail Lamps Study 3.1: Dimming, Flicker, and Power Quality Characteristics of LED A Lamps.  

SciTech Connect

To date, all three reports in the retail lamps series have focused on basic performance parameters, such as lumen output, efficacy, and color quality. This report goes a step further, examining the photoelectric characteristics (i.e., dimming and flicker) of a subset of lamps from CALiPER Retails Lamps Study 3. Specifically, this report focuses on the dimming, power quality, and flicker characteristics of 14 LED A lamps, as controlled by four different retail-available dimmers. The results demonstrate notable variation across the various lamps, but little variation between the four dimmers. Overall, the LED lamps: ~tended to have higher relative light output compared to the incandescent and halogen benchmark at the same dimmer output signal (RMS voltage). The lamps’ dimming curves (i.e., the relationship between control signal and relative light output) ranged from linear to very similar to the square-law curve typical of an incandescent lamp. ~generally exhibited symmetrical behavior—the same dimming curve—when measured proceeding from maximum to minimum or minimum to maximum control signal. ~mostly dimmed below 10% of full light output, with some exceptions for specific lamp and dimmer combinations ~exhibited a range of flicker characteristics, with many comparing favorably to the level typical of a magnetically-ballasted fluorescent lamp through at least a majority of the dimming range. ~ always exceeded the relative (normalized) efficacy over the dimming range of the benchmark lamps, which rapidly decline in efficacy when they are dimmed. This report generally does not attempt to rank the performance of one product compared to another, but instead focuses on the collective performance of the group versus conventional incandescent or halogen lamps, the performance of which is likely to be the baseline for a majority of consumers. Undoubtedly, some LED lamps perform better—or more similar to conventional lamps—than others. Some perform desirably for one characteristic, but not others. Consumers (and specifiers) may have a hard time distinguishing better-performing lamps from one another; at this time, physical experimentation is likely the best evaluation tool.

Royer, Michael P.; Poplawski, Michael E.; Brown, Charles C.

2014-12-14T23:59:59.000Z

59

Energy Cost Calculator for Compact Fluorescent Lamps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compact Fluorescent Lamps Compact Fluorescent Lamps Energy Cost Calculator for Compact Fluorescent Lamps October 8, 2013 - 2:18pm Addthis This tool calculates the payback period for your calc retrofit project. Modify the default values to suit your project requirements. Existing incandescent lamp wattage Watts Incandescent lamp cost dollars Incandescent lamp life 1000 hours calc wattage Watts calc cost dollars calc life (6000 hours for moderate use, 10000 hours for high use) 8000 hours Number of lamps in retrofit project Hours operating per week hours Average cost of electricity 0.06 $/kWh Relamper labor costs $/hr Time taken to retrofit all lamps in this project min Time taken to relamp one lamp min Type of Relamping Practiced: Group Relamping: Calculate Simple Payback Period months

60

Comparison of technologies for new energy-efficient lamps  

SciTech Connect

Energy-efficient light bulbs are being developed to replace the incandescent lamp where they can satisfy the design criteria and be used in sockets that have long hours of annual use. The four technologies discussed here include the compact fluorescent lamp, coated-filament lamp, electrodeless fluorescent lamp, and compact high-intensity discharge lamp. The systems demonstrate efficacy improvements of two to four times that of their incandescent counterparts. These new lamps have required considerable advances in lamp technology. They offer the potential for achieving efficacies close to 80 lumens per watt. These new lamps will reduce the energy used annually by incandescent lamps (190 BkWh) by more than 50% in the 1990s, at which times they will be commonly employed.

Verderber, R.R.; Rubinstein, F.R.

1983-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Comparison of technologies for new energy-efficient lamps  

SciTech Connect

Energy-efficient light bulbs are being developed to replace the incandescent lamp where they can satisfy the design criteria and be used in sockets that have long hours of annual use. The four technologies discussed include the compact fluorescent lamp, coated-filament lamp, electrodeless fluorescent lamp, and compact high-intensity discharge lamp. The systems demonstrate efficacy improvements of two to four times that of their incandescent counterparts. These new lamps have required considerable advances in lamp technology. They offer the potential for achieving efficacies close to 80 lm/W. These new lamps will reduce the energy used annually by incandescent lamps (190 billion kWh) by more than 50 percent in the 1990's, at which times they will be commonly employed.

Verderber, R.R.; Rubinstein, F.M.

1984-09-01T23:59:59.000Z

62

Acquisition Letter Notice 2015-10 Announcing Award of General Services Administration Federal  

Energy.gov (U.S. Department of Energy (DOE))

The General Services Administration (GSA) recently awarded Office Supplies 3, the third generation of Federal Strategic Sourcing Initiative (FSSI) contracts for office supplies. The Deputy Secretary’s Memorandum signed July 25, 2013 requiring the use of the GSA’s FSSI for office supplies remains in effect. This mandate does NOT require the termination of existing orders for office supplies, nor does it preclude the use of DOE’s AbilityOne Supply Stores, Paperclips, Etc., (Forrestal Building and Germantown).

63

Laboratory Evaluation of LED T8 Replacement Lamp Products  

SciTech Connect

A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

2011-05-23T23:59:59.000Z

64

Max Tech and Beyond: High-Intensity Discharge Lamps  

E-Print Network (OSTI)

formation of the electric discharge arc and the metals emitdefined as electric discharge lamps in which the arc tubelamp - an electric discharge lamp in which the arc tube wall

Scholand, Michael

2012-01-01T23:59:59.000Z

65

Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps  

Energy.gov (U.S. Department of Energy (DOE))

Below is the text-alternative version of the "LED Replacements for Linear Fluorescent Lamps" webcast, held June 20, 2011.

66

Medium Base Compact Fluorescent Lamps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Templates for Reporting Test Results mediumbasecfltestreporttemplatev1.1.xlsx More Documents & Publications Fluorescent Lamp Ballasts Showerheads Beverage Vending Machines...

67

Mercury Lamps Recycling Fluorescent light-tubes, compact fluorescent bulbs, mercury and sodium vapor lamps, ultraviolet and  

E-Print Network (OSTI)

Mercury Lamps Recycling Fluorescent light-tubes, compact fluorescent bulbs, mercury and sodium vapor lamps, ultraviolet and HID (high-intensity discharge) lamps and all other mercury containing labeled for shipment to a recycling plant for mercury, glass and aluminum recovery. The beneficial re

Baker, Chris I.

68

Lighting Group: Sources and Ballasts: LED Reflector Lamp  

NLE Websites -- All DOE Office Websites (Extended Search)

LED Reflector Lamp LED Reflector Lamp LED Reflector Lamp Objective LED reflector lamp The goal of this project is to develop a revolutionary new reflector lamp which offers many advantages over current incandescent reflector lamps, including: three times greater efficiency ten times the rated life greater optical and performance properties use of light emitting diodes (LEDs) to generate the light. Although LEDs have been commercially available since the late 1960Â’s, recent dramatic improvements in LED technology have led to white light devices with efficiencies that meet or exceed those of a standard incandescent lamp. This project will build upon these improvements to develop a new type of source for focusing light. Contact Information For more information on this project, please contact:

69

LED lamp color control system and method  

SciTech Connect

An LED lamp color control system and method including an LED lamp having an LED controller 58; and a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 determines whether the LED source 80 is in a feedback controllable range, stores measured optical flux for the LED source 80 when the LED source 80 is in the feedback controllable range, and bypasses storing the measured optical flux when the LED source 80 is not in the feedback controllable range.

Gaines, James; Clauberg, Bernd; Van Erp, Josephus A.M.

2013-02-05T23:59:59.000Z

70

GENERAL SERVICES ADMINISTRATION NATIONAL ARCHIVES AND RECORDS SERVICE, WASHINGTON, DC 20408  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GENERAL SERVICES ADMINISTRATION GENERAL SERVICES ADMINISTRATION NATIONAL ARCHIVES AND RECORDS SERVICE, WASHINGTON, DC 20408 1. F R O M (Agency or establishment) Lawrence Berkeley Laboratory 2. MAJOR SUBDIVISION REQUEST FOR RECORDS DISPOSITION AUTHORITY (See ~nstructions on reverse) 3. M I N O R SUBDIVISION LEAVE BLANK JOB N O . H / - % ~ ~ L J - - !If'-7 D A T E R E C E I V E D /z-=4g NOTIFICATION TO AGENCY In accordance with the provisions of 44 U.S.C. 3303a the di$posal request, including amendments, is approved except for items that may be marked "disposition not approved" or "withdrawn" in column 10. If no records are proposed for disposal, the signature of the Archivist is not reauired. I , I 4. N A M E O F PERSON W I T H W H O M T O CONFER 1 5 . TELEPHONE E X T . I D A T E I hereby certify that I am authorized t

71

Fluorescent ballast and lamp disposal issues  

SciTech Connect

All around the world, governments, utility companies, and private businesses are attempting to reduce the amount of energy consumed. In the US alone, new economic strategies and programs are being created to facilitate this process. For instance, the recent enactment of the National Energy Policy Act, the Environmental Protection Agency`s (EPA) Green Lights Program, and a surge of utility involvement in Demand Side Management (DSM) Commercial/Industrial Direct Install and Rebate Programs. Many of these problems target commercial/industrial lighting system retrofits as one of the most cost effective avenues for reducing the consumption of energy. Due to this trend, hundreds of millions of lighting ballasts and lamps are being discarded. The benefits of these programs result in enormous reductions in fossil fuels (and subsequent carbon dioxide, sulfur dioxide, and nitrogen oxide emissions) required to generate the displaced electricity. Throughout the US, however, there is an increasing concern for the environmental impacts surrounding the accelerated disposal of both lighting ballasts and lamps. Regulations initially established were for a one by one, retirement (failure) process rather than promoted obsolescence and forced retirement of lamp groups or entire systems (truckloads of old technologies). Recognizing this trend and the potential negative environmental effects, federal, state, and local regulators are reevaluating the impacts and are being asked to promulgate policies to specifically address this situation.

Leishman, D.L. [Alta Resource Management Services, Inc., Springfield, MA (United States)

1996-12-01T23:59:59.000Z

72

RF driven sulfur lamp having driving electrodes arranged to cool the lamp  

DOE Patents (OSTI)

A high intensity discharge lamp without mercury is disclosed radiating a selected spectrum of which can be almost entirely in the visible range from an envelope that contains a sulfur containing substance. The lamp utilizes a signal source that generates an excitation signal that is externally coupled to the exterior surface of the envelope to excite the enclosed sulfur containing substance. Various embodiments of the lamp use electrodes adjacent the envelope to couple the excitation signal thereto with the face of the electrodes shaped to complement the shape of the exterior surface of the envelope. Two shapes discussed are spherical and cylindrical. To minimize filamentary discharges each envelope may include an elongated stem affixed to the exterior thereof whereby a rotational subsystem spins the envelope. In yet another embodiment the envelope has a Dewar configuration with two electrodes, one positioned near the external curved side surface of the body, and a second to the inner surface of the hole through the envelope. Further, the envelope may contain a backfill of a selected inert gas to assist in the excitation of lamp with that backfill at a pressure of less than 1 atmosphere, wherein the backfill pressure is directly related to the increase or decrease of peak output and inversely related to the increase and decrease of the emitted spectrum from the envelope. The emitting fill can be less than 6 mg/cc, or at least 2 mg/cc of the envelope of a sulfur containing substance. 17 figs.

Gabor, G.; Orr, T.R.; Greene, C.M.; Crawford, D.G.; Berman, S.M.

1998-10-20T23:59:59.000Z

73

Impending U.S. lighting standards will boost market for halogen-infrared lamps: New product line expanding  

SciTech Connect

Many of the incandescent floodlights and spotlights manufactured today will not meet lighting efficiency standards taking effect in the US in 1995. As these models cease production, demand will grow for higher efficiency units to fill this huge market, which now totals about 100 million lamps per year. One prime contender is a new class of halogen lamps that use a spectrally selective coating to reflect heat back onto the filament, reducing the amount of electricity needed to generate light. GE Lighting`s Halogen-IR line is the only series of such lamps currently available to replace the conventional floodlights and spotlights that will be banned by the new standards. Other manufacturers may adopt the technology, however, and the Japanese producer Ushio already sells in the US a line of smaller halogen lamps with a similar heat-reflective coating. In terms of efficacy and lifetime, Halogen-IR lamps out perform standard incandescents and standard halogens, but fall far short of fluorescent, metal halide, and high-pressure sodium sources. These other lighting systems are more appropriate and cost-effective than incandescents for many ambient lighting applications. For accent lighting and other tasks that are best suited to incandescent lighting, however, the Halogen-IR lamp is often a superior choice.

Sardinsky, R.; Shepard, M.

1993-12-31T23:59:59.000Z

74

The National Energy Policy Act and lamp replacement options  

SciTech Connect

The National Policy Act of 1992 involves the creation of energy efficiency standards for a wide range of products including fluorescent and incandescent lamps. Minimum efficacy (lumens per watt) and color rendering index (CRI) standards are mandated for the popular fluorescent lamps: four-foot medium bi-pin, two-foot U-bent, eight-foot slimline and eight-foot high output. Minimum efficacies are mandated for specific incandescent R and PAR reflector lamps. These standards will affect selected colors and designs of fluorescent lamps, the most significant being the standard lamps in the cool white and warm white colors. The incandescent reflector lamps will include the R-30, R-40, PAR-38 lamps above 40 watts, excluding the halogen types. These efficiency and color rendering standards will require end-users and specifiers to select replacement fluorescent lamps from a range of performance characteristics (lumen output, efficacy, CRI and price). The choice of replacement for the R and PAR incandescent lamps will include the halogen designs and compact fluorescent designs. In this paper, replacement options will be analyzed and discussed and the effect of these options on the performance of the lighting system will be explored in detail.

Ryerson, C.

1995-06-01T23:59:59.000Z

75

Max Tech and Beyond: High-Intensity Discharge Lamps  

E-Print Network (OSTI)

of color compared with the incandescent reference source isin this report. Standard Incandescent Halogen Low-Pressure:value equivalent to an incandescent filament lamp. Taking

Scholand, Michael

2012-01-01T23:59:59.000Z

76

YEAR  

National Nuclear Security Administration (NNSA)

96 YEAR 2013 Males 69 Females 27 YEAR 2013 SES 1 EJEK 9 EN 04 27 NN (Engineering) 26 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 3 YEAR 2013 American Indian Alaska Native Male...

77

Lamp for generating high power ultraviolet radiation  

DOE Patents (OSTI)

The apparatus is a gas filled ultraviolet generating lamp for use as a liquid purifier. The lamp is powred by high voltage AC, but has no metallic electrodes within or in contact with the gas enclosure which is constructed as two concentric quartz cylinders sealed together at their ends with the gas fill between the cylinders. Cooling liquid is pumped through the volume inside the inner quartz cylinder where an electrically conductive pipe spaced from the inner cylinder is used to supply the cooling liquid and act as the high voltage electrode. The gas enclosure is enclosed within but spaced from a metal housing which is connected to operate as the ground electrode of the circuit and through which the treated fluid flows. Thus, the electrical circuit is from the central pipe, and through the cooling liquid, the gas enclosure, the treated liquid on the outside of the outer quartz cylinder, and to the housing. The high voltage electrode is electrically isolated from the source of cooling liquid by a length of insulated hose which also supplies the cooling liquid.

Morgan, Gary L. (Elkridge, MD); Potter, James M. (Los Alamos, NM)

2001-01-01T23:59:59.000Z

78

Review of radiological surveys of the General Services Administration's Raritan Depot in Edison, New Jersey  

SciTech Connect

This report reviews two recent radiological surveys of the General Services Administration (GSA) Raritan Depot in Edison, New Jersey, that were conducted after somewhat elevated levels of radiation were detected within a depot building. The first survey indicated gamma radiation levels were higher than natural background levels in some buildings and identified the probable source of the radiation as gypsum-like building tiles that contained natural uranium-chain radionuclides at a level 20 times higher than other materials. Elevated levels of radon and radon decay products also were detected in some buildings. A follow-on survey was conducted to confirm the January measurements and to measure radiation levels at other locations: additional buildings at the depot, buildings on the Middlesex County College campus, and a possible outdoor disposal site. EPA measurements established that ceiling material is the primary source of the radiation. Radioisotope analysis of the ceiling tile material from buildings with elevated radiation levels showed the presence of radium-226 at levels of approximately 25 picocuries per gram (pCi/g); this material would thus have to be treated as hazardous waste, should it be removed. This report critiques the methodology and results of the two surveys and recommends further action.

Herzenberg, C.L.; Winter, R.C.

1986-10-01T23:59:59.000Z

79

DEFINING THE EFFECTIVENESS OF UV LAMPS  

Office of Scientific and Technical Information (OSTI)

ARTI-21CR/610-40030-01 ARTI-21CR/610-40030-01 DEFINING THE EFFECTIVENESS OF UV LAMPS INSTALLED IN CIRCULATING AIR DUCTWORK Final Report Date Published - November 2002 Douglas VanOsdell and Karin Foarde RTI P.O. Box 12194 Research Triangle Park, NC 27709-2194 Prepared for the AIR-CONDITIONING AND REFRIGERATION TECHNOLOGY INSTITUTE 4100 N. Fairfax Drive, Suite 200, Arlington, Virginia 22203 Distribution A - Approved for public release; further dissemination unlimited. DISCLAIMER This report was prepared as an account of work sponsored by the Air-Conditioning and Refrigeration Technology Institute (ARTI) under its "HVAC&R Research for the 21 st Century" (21-CR) program. Neither ARTI, the financial supporters of the 21-CR program, or any agency

80

Application Summary Report 22: LED MR16 Lamps  

SciTech Connect

This report analyzes the independently tested photometric performance of 27 LED MR16 lamps. It describes initial performance based on light output, efficacy, distribution, color quality, electrical characteristics, and form factor, with comparisons to a selection of benchmark halogen MR16s and ENERGY STAR qualification thresholds. Three types of products were targeted. First, CALiPER sought 3000 K lamps with the highest rated lumen output (i.e., at least 500 lm) or a claim of equivalency to a 50 W halogen MR16 or higher. The test results indicate that while the initial performance of LED MR16s has improved across the board, market-available products still do not produce the lumen output and center beam intensity of typical 50 W halogen MR16 lamps. In fact, most of the 18 lamps in this category had lower lumen output and center beam intensity than a typical 35 W halogen MR16 lamp. Second, CALiPER sought lamps with a CRI of 90 or greater. Only four manufacturers were identified with a product in this category. CALiPER testing confirmed the performance of these lamps, which are a good option for applications where high color fidelity is needed. A vast majority of the LED MR16 lamps have a CRI in the low 80s; this is generally acceptable for ambient lighting, but may not always be acceptable for focal lighting. For typical LED packages, there is a fundamental tradeoff between CRI and efficacy, but the lamps in the high-CRI group in this report still offer comparable performance to the rest of the Series 22 products in other performance areas. Finally, CALiPER sought lamps with a narrow distribution, denoted as a beam angle less than 15°. Five such lamps were purchased. Notably, no lamp was identified as having high lumen output (500 lumens or greater), high CRI (90 or greater), a narrow distribution (15° or less), and an efficacy greater than 60 lm/W. This would be an important achievement for LED MR16s especially if output could reach approximately 700 800 lumens, or the approximate equivalent of a 50 W halogen MR16 lamp. Many factors beyond photometric performance should be considered during specification. For example, performance over time, transformer and dimmer compatibility, and total system performance are all critical to a successful installation. Subsequent CALiPER reports will investigate more complex issues.

Royer, Michael P.

2014-07-23T23:59:59.000Z

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

YEAR  

National Nuclear Security Administration (NNSA)

2540 YEAR 2013 Males 1677 Females 863 YEAR 2013 SES 102 EX 3 SL 1 EJEK 89 EN 05 41 EN 04 170 EN 03 18 NN (Engineering) 448 NQ (ProfTechAdmin) 1249 NU (TechAdmin Support) 76 NV...

82

Highly Efficient Small Form Factor LED Retrofit Lamp  

SciTech Connect

This report summarizes work to develop a high efficiency LED-based MR16 lamp downlight at OSRAM SYLVANIA under US Department of Energy contract DE-EE0000611. A new multichip LED package, electronic driver, and reflector optic were developed for these lamps. At steady-state, the lamp luminous flux was 409 lumens (lm), luminous efficacy of 87 lumens per watt (LPW), CRI (Ra) of 87, and R9 of 85 at a correlated color temperature (CCT) of 3285K. The LED alone achieved 120 lumens per watt efficacy and 600 lumen flux output at 25 C. The driver had 90% electrical conversion efficiency while maintaining excellent power quality with power factor >0.90 at a power of only 5 watts. Compared to similar existing MR16 lamps using LED sources, these lamps had much higher efficacy and color quality. The objective of this work was to demonstrate a LED-based MR16 retrofit lamp for replacement of 35W halogen MR16 lamps having (1) luminous flux of 500 lumens, (2) luminous efficacy of 100 lumens per watt, (3) beam angle less than 40{sup o} and center beam candlepower of at least 1000 candelas, and (4) excellent color quality.

Steven Allen; Fred Palmer; Ming Li

2011-09-11T23:59:59.000Z

83

Maintaining optimum fluorescent lamp performance under elevated temperature conditions  

SciTech Connect

This paper describes a new technique for optimizing fluorescent lamp performance under elevated temperature conditions. This approach uses a thermo-electric Peltier device to produce a localized cold spot temperature of approximately 40/sup 0/C, allowing the lamps to maintain maximum light output and efficacy independent of prevailing ambient temperatures inside a luminaire. Experimental data show that a 20% increase in light output and a 10% increase in efficacy over typical lamp performance in a warm fixture environment can be obtained using this device. Only 0.25 watts must be supplied to the Peltier device to produce these results.

Siminovitch, M.J.; Rubinstein, F.M.; Clark, T.A.; Verderber, R.R.

1986-04-01T23:59:59.000Z

84

Covered Product Category: Compact Fluorescent Lamps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Covered Product Category: Compact Fluorescent Lamps Covered Product Category: Compact Fluorescent Lamps Covered Product Category: Compact Fluorescent Lamps October 7, 2013 - 10:48am Addthis ENERGY STAR Qualified Products Federal Energy Management Program (FEMP) provides acquisition guidance across a variety of product categories, including compact fluorescent lamps (CFLs), which are an ENERGY STAR-qualified product category. Federal laws and executive orders mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law. Most manufacturers display the ENERGY STAR label on complying models. For a model not displaying this label, check the manufacturer's literature to determine if it meets the efficiency requirements outlined by ENERGY STAR.

85

Information Resources: LED Replacements for Linear Fluorescent Lamps  

NLE Websites -- All DOE Office Websites (Extended Search)

Replacements for Linear Fluorescent Lamps Webcast Replacements for Linear Fluorescent Lamps Webcast In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting Facts-listed products as well as products evaluated in the latest CALiPER reports. Eric Richman, also of PNNL, reported on a recently completed GATEWAY demonstration project, in which LED and fluorescent lamps were installed in a variety of recessed troffer luminaires for comparison in an office environment. The presentation concluded with a discussion of specifications listed in a newly updated technology fact sheet. View presentation slides View the text-alternative version View the webcast (WMV 16 MB) Download Windows Media Player

86

Burst Radio-Frequency Excited Pulsed Hollow-Cathode Lamp  

Science Journals Connector (OSTI)

Transient emission characteristics of a hollow-cathode lamp driven by a pulsed current in combination with a radio-frequency burst signal are described. The radio-frequency field...

Araki, Tsutomu; Walters, John P; Minami, Shigeo

1980-01-01T23:59:59.000Z

87

DOE Publishes Long-Term Testing Investigation of Retail Lamps  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy's CALiPER program has released another special report on LED lamps that are available through the retail marketplace and targeted toward general consumers. CALiPER...

88

Conservation Potential of Compact Fluorescent Lamps in India and Brazil  

E-Print Network (OSTI)

38 TWh, 10% of which was for incandescent lighting (Fig. 3).The electricity consumed in incandescent lighting can be300 and 400 million incandescent lamps in the country. Let

Gadgil, A.J.

2008-01-01T23:59:59.000Z

89

Optimized Magnetic Components Improve Efficiency of Compact Fluorescent Lamps  

E-Print Network (OSTI)

xtures (designed for incandescent bulbs) has allowed residential and small commercial electric customers of incandescent lamps and last 10 times longer [1]. High-frequency electronic ballasts are used to power CFLs

90

DOE Publishes New CALiPER Report on Retail Lamps  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy's CALiPER program has released a special report on LED lamps available through the retail marketplace and targeted toward general consumers. While previous reports in...

91

Magnetic fluorescent lamp having reduced ultraviolet self-absorption  

DOE Patents (OSTI)

The radiant emission of a mercury-argon discharge in a fluorescent lamp assembly (10) is enhanced by providing means (30) for establishing a magnetic field with lines of force along the path of electron flow through the bulb (12) of the lamp assembly, to provide Zeeman splitting of the ultraviolet spectral line. Optimum results are obtained when the magnetic field strength causes a Zeeman splitting of approximately 1.7 times the thermal line width.

Berman, Samuel M. (San Francisco, CA); Richardson, Robert W. (Pelham, NY)

1985-01-01T23:59:59.000Z

92

Perceptions of compact fluorescent lamps in the residential market  

SciTech Connect

Compact fluorescent lamps offer significant energy savings over other forms of residential lighting and last up to 10 times longer than conventional incandescent bulbs. In order to better understand existing barriers to acceptance and future opportunities for growth of compact fluorescent lighting in the residential retrofit sector, a three stage research project was designed and conducted by MACRO Consulting, Inc. Assessment of whether or not the benefits of compact fluorescent lamps are sufficient to overcome price resistance was one of the major purposes of this project. Residential customers were interviewed in focus group sessions to help determine key issues and motivating forces in the lighting/energy saving/cost saving equation. Residential customers in 5 major market areas were contacted by telephone, and data about their awareness, knowledge and use of compact fluorescent lighting were collected. These customers also participated in an attribute rating exercise in which compact fluorescent lamps were compared with fluorescent tubes and incandescent bulbs on a series of product attributes. A price elasticity exercise was also conducted. Teleconferences with retailers of compact fluorescent lamps were conducted in order to explore their knowledge of and attitudes towards compact fluorescent lamps. Customers agree that energy savings and longer life are both positive attributes for residential lighting products, but they are not yet ready to make the switch away from inexpensive, versatile and readily available incandescent bulbs to compact fluorescent lamps. Compact fluorescent lamps are rated poorly (even by satisfied'' users) on each of seven positive attributes of home lighting. Major barriers to increased use of compact fluorescent lamps include price, convenience, and performance. Prices above $10 are considered outrageous''. Product improvements are needed for appearance, light output and versatility.

Weiner, J.; Campbell, C.J. (Macro Consulting, Inc., Mountain View, CA (United States))

1992-07-01T23:59:59.000Z

93

Compact fluorescent lamp using horizontal and vertical insulating septums and convective venting geometry  

DOE Patents (OSTI)

A novel design is described for a compact fluorescent lamp, including a lamp geometry which will increase light output and efficacy of the lamp in a base down operating position by providing horizontal and vertical insulating septums positioned in the ballast compartment of the lamp to provide a cooler coldspot. Selective convective venting provides additional cooling of the ballast compartment. 9 figs.

Siminovitch, M.

1998-02-10T23:59:59.000Z

94

A light diet for a giant appetite: An assessment of China's proposed fluorescent lamp standard  

E-Print Network (OSTI)

standard for linear fluorescent lamps Length (mm) Minimum efficacy (lm/W) Efficacy for energy conservation

Lin, Jiang

2002-01-01T23:59:59.000Z

95

All mercury lamps contain small amounts of mercury. An electric current passes through the lamp and vaporizes the mercury to generate light. Recycling mercury containing lamps protects human health and our environment from heavy  

E-Print Network (OSTI)

All mercury lamps contain small amounts of mercury. An electric current passes through the lamp and vaporizes the mercury to generate light. Recycling mercury containing lamps protects human health and our the environment by recycling universal wastes, contact EH&S at (949) 824-6200 or visit: www.ehs.uci.edu Mercury

George, Steven C.

96

YEAR  

National Nuclear Security Administration (NNSA)

1 1 YEAR 2011 Males 18 Females 23 YEAR 2011 SES 2 EJ/EK 2 NQ (Prof/Tech/Admin) 35 NU (Tech/Admin Support) 2 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 9 Asian Male 0 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 12 White Female 6 DIVERSITY Workforce Diversity Associate Administrator for Information Management & Chief Information Officer, NA-IM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 18 43.9% 23 56.1% Gender Males Females 4.9% 4.9% 85.4% 4.9% Pay Plan SES EJ/EK NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 2.4% 4.9% 7.3% 22.0% 0.0% 0.0% 4.9% 14.6% 29.3% 14.6% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

97

YEAR  

National Nuclear Security Administration (NNSA)

4 4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 31 NU (Tech/Admin Support) 5 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 10 White Male 13 White Female 10 DIVERSITY Workforce Diversity Office of General Counsel, NA-GC As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 21 47.7% 23 52.3% Gender Males Females 6.8% 2.3% 2.3% 6.8% 70.5% 11.4% Pay Plan SES EJ/EK EN 03 NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.0% 0.0% 2.3% 4.5% 2.3% 2.3% 13.6% 22.7% 29.5% 22.7% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

98

YEAR  

National Nuclear Security Administration (NNSA)

6 6 YEAR 2011 Males 7 Females 9 YEAR 2011 SES 1 NQ (Prof/Tech/Admin) 9 GS 15 2 GS 13 2 GS 12 1 GS 11 1 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 4 White Female 6 DIVERSITY Workforce Diversity Associate Administrator of External Affairs, NA-EA As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 7 43.8% 9 56.3% Gender Males Females 6.3% 56.3% 12.5% 12.5% 6.3% 6.3% Pay Plan SES NQ (Prof/Tech/Admin) GS 15 GS 13 GS 12 GS 11 0.0% 0.0% 6.3% 18.8% 6.3% 0.0% 6.3% 0.0% 25.0% 37.5% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male Hispanic Female White Male White Female FY11 Workforce Diversity

99

YEAR  

National Nuclear Security Administration (NNSA)

40 40 YEAR 2011 Males 68 Females 72 YEAR 2011 SES 5 EJ/EK 1 NN (Engineering) 16 NQ (Prof/Tech/Admin) 115 NU (Tech/Admin Support) 3 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 7 Asian Male 4 Asian Female 0 Hispanic Male 25 Hispanic Female 26 White Male 35 White Female 37 DIVERSITY Workforce Diversity Associate Administrator for Acquistion & Project Management, NA-APM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 68 48.6% 72 51.4% Gender Males Females 3.6% 0.7% 11.4% 82.1% 2.1% Pay Plan SES EJ/EK NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.7% 1.4% 2.1% 5.0% 2.9% 0.0% 17.9% 18.6% 25.0% 26.4% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male

100

Years  

NLE Websites -- All DOE Office Websites (Extended Search)

and Technology in and Technology in the National Interest 60 Years of Excellence Lawrence Livermore National Laboratory FY 2012 Annual Report About the Cover: Lawrence Livermore National Laboratory (LLNL) engineers Chris Spadaccini (left) and Eric Duoss are shown experimenting with direct ink-writing to create micro- to macroscale structures with extreme precision. The Laboratory is advancing this process and other additive manufacturing technologies to develop new materials with extraordinary properties for use in a wide range of national-security and other applications. About the Laboratory: Lawrence Livermore National Laboratory was founded in 1952 to enhance the security of the United States by advancing nuclear weapons science and technology. With a talented and dedicated workforce and

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Assessing the Risk of Mercury in Drinking Water after UV Lamp Breaks Page 1 Assessing the Risk of Mercury in Drinking Water after UV Lamp Breaks  

E-Print Network (OSTI)

Assessing the Risk of Mercury in Drinking Water after UV Lamp Breaks Page 1 Assessing the Risk of Mercury in Drinking Water after UV Lamp Breaks Heidi Borchers University of New Hampshire, Environmental Ultraviolet (UV) lamps generate ultraviolet light through the vaporization of elemental mercury, by using

102

Confirmation of the chromosomal localization of human lamp genes and their exclusion as candidate genes for Salla disease  

Science Journals Connector (OSTI)

Salla disease is an inherited lysosomal storage disorder caused by accumulation of free sialic acid in the lysosomes. Lamp genes, lamp A and lamp B (lysosome associated membrane proteins), are the first known ...

Johanna Schleutker; Leena Haataja; Martin Renlund; Lea Puhakka…

1991-11-01T23:59:59.000Z

103

Low-pressure microwave plasma ultraviolet lamp for water purification  

Science Journals Connector (OSTI)

Low-pressure mercury lamps are commonly used for germicidal applications. The germicidal effect is due to the emission of light at 254 nm, which leads to the destruction of the most waterborne bacteria and viruses. The microwave plasma ultraviolet (UV) lamp (MPUVL) is a new technology for generating a high-intensity UV light and that can be also controlled to operate at 185 nm; irradiation is in air at this wavelength produces ozone. The microwave power is injected into a resonant cavity and the surface wave excitation takes place within the cavity through that part of the discharge tube (fused silica) protruding inside it. The MPUVL has many advantages over conventional lamps, which are limited to an output power in the region of 30 W m-1, while MPUVL can deliver any amount of power per unit length and the tube can be of any shape, length or diameter. This paper describes the design of the MPUVL and compares its efficiency with that of conventional lamps through spectral analysis. Other results, which include the effects of temperature and different power inputs, are also discussed.

A I Al-Shamma'a; I Pandithas; J Lucas

2001-01-01T23:59:59.000Z

104

The Energy Efficiency of the U.S Fluorescent Lamp Ballast Industry  

NLE Websites -- All DOE Office Websites (Extended Search)

The Energy Efficiency of the U.S Fluorescent Lamp Ballast Industry The Energy Efficiency of the U.S Fluorescent Lamp Ballast Industry Speaker(s): Francis Rubinstein Date: February 14, 2008 - 12:00pm Location: 90-3122 Fluorescent lamp ballasts are subject to DOE appliance standards and rulemaking. But currently, only ballasts for older fluorescent lamp types, such as T-12 lamps are subject to minimum efficacy limits. The majority of fluorescent lamps now being shipped (T-8 and T-5 types) type are operated by ballasts that will not be subject to DOE rule until 2011. The metric used by DOE for characterizing the electrical efficiency of the fluorescent lamp-ballast system is called Ballast Efficacy Factor (BEF). Because BEF is not normalized, it is of limited utility for rulemaking and is useless for procurement. But by normalizing BEF to the total lamp power, I have

105

Solid-State Lighting: LED Replacement Lamps: Current Performance and the  

NLE Websites -- All DOE Office Websites (Extended Search)

LED Replacement Lamps: Current LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® to someone by E-mail Share Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Facebook Tweet about Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Twitter Bookmark Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Google Bookmark Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Delicious Rank Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Digg Find More places to share Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on

106

LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®  

Energy.gov (U.S. Department of Energy (DOE))

This May 19, 2009 webcast summarized CALiPER's recent benchmark testing of common omnidirectional incandescent lamps (e.g., A-lamps), and provided an update on ENERGY STAR criteria for LED integral...

107

Transport phenomena in metal-halide lamps a poly-diagnostic study  

E-Print Network (OSTI)

/ spectroscopie. Subject headings: gas discharges / metal-halide lamps / plasma diagnostics / plasma properties-halide arc lamps . . . . . . . . . . . 7 1.3 Scope of ThesisTransport phenomena in metal-halide lamps a poly-diagnostic study Tanya Nimalasuriya #12;Copyright

Eindhoven, Technische Universiteit

108

Energy-efficient compact screw-in fluorescent lamp. Final report  

SciTech Connect

A compact fluorescent lamp has been designed and constructed which can replace an incandescent lamp. The lamp is slightly larger than a standard lamp (8 3/4 in. x 3 1/4 in.), but is designed to fit a majority of portable lamp applications. This version, with a core-coil ballast, results in a system efficacy of 54 lumens per watt, with a light output of more than 1800 lumens. This compares favorably with a 100-watt incandescent (17.5 lumens per watt and 1750 lumens light output). The color temperature of 3000/sup 0/K is compatible with an incandescent lamp (2800/sup 0/K). The color rendition index (CRI) is 84. With a solid-state ballast, the efficacy and light output could be increased by 20% (65 l/w, 2200 lumens) and could provide a direct replacement for a three-way, 150-watt incandescent lamp (15 l/w, 2200 lumens).

Morton, E.W.

1982-11-01T23:59:59.000Z

109

Sulfur Lamps-The Next Generation of Efficient Light?  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Sulfur Lamps-The Next Generation of Efficient Light? The figure above is a schematic of the system installed at the National Air and Space Museum and the DOE headquarters in Washington, D.C., Light from the sulfur lamp is focused by a parabolic reflector so that it enters the light pipe within a small angular cone. Light travels down the pipe, reflecting off the prismatic film (A) that lines the outer acrylic tube. The prismatic film reflects the light through total internal reflection (C), an intrinsically efficient process. Some of the light striking the film (at A) is not reflected and "leaks out" of the pipe walls (B), giving the pipe a glowing appearance. A light ray that travels all the way down the pipe will strike the mirror at the end (D) and return back up the pipe.

110

Energy and Economic Impacts of U.S. Federal Energy and Water Conservation Standards Adopted From 1987 Through 2011  

E-Print Network (OSTI)

Fluorescent Lamps and Incandescent Reflector Lamps EPACTBallasts and Fixtures General Service Incandescent Lamps,Intermediate Base Incandescent Lamps and Candelabra Base

Meyers, Stephen

2013-01-01T23:59:59.000Z

111

Energy and Economic Impacts of U.S. Federal Energy and Water Conservation Standards Adopted From 1987 through 2012  

E-Print Network (OSTI)

Fluorescent Lamps and Incandescent Reflector Lamps EPACTBallasts and Fixtures General Service Incandescent Lamps,Intermediate Base Incandescent Lamps and Candelabra Base

Meyers, Stephen

2013-01-01T23:59:59.000Z

112

Energy and Economic Impacts of U.S. Federal Energy and Water Conservation Standards Adopted From 1987 Through 2010  

E-Print Network (OSTI)

Fluorescent Lamps and Incandescent Reflector Lamps MediumBallasts and Fixtures General Service Incandescent Lamps,Intermediate Base Incandescent Lamps and Candelabra Base

Meyers, Stephen

2013-01-01T23:59:59.000Z

113

ISSUANCE 2014-12-29: Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts  

Energy.gov (U.S. Department of Energy (DOE))

Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

114

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Certain Lamps Exempted from General Service Incandescent Lamp Standards Certain Lamps Exempted from General Service Incandescent Lamp Standards Sign up for e-mail updates on regulations for this and other products The information on this page pertains to the Department of Energy's (DOE) analysis of and unit sales forecast for five lamp types, which was mandated by the Energy Independence and Security Act of 2007 (EISA 2007). Among the requirements of subtitle B of title III of EISA 2007 were provisions directing DOE to evaluate and publish within 1 year a benchmark unit sales estimate for five types of incandescent lamps (rough service lamps, vibration service lamps, 3-way incandescent lamps, 2,601-3,300 lumen general service incandescent lamps, and shatter-resistant lamps). These lamp types were not made subject to the regulatory standards for general service incandescent lamps established by EISA 2007. Among the requirements of subtitle B of title III of EISA 2007 were provisions directing DOE to collect, analyze, and monitor unit sales of these five lamp types.

115

Photovoltaic experiment using light from a solar simulator lamp  

Science Journals Connector (OSTI)

A photovoltaic cellexperiment utilizing the convenience of a solar simulating type lamp is described. The circuit for obtaining the cell characteristic drives an X?Y plotter to graph continuously the characteristics from short circuit current to the open circuit voltage. Calibration methods and their limitation are discussed for estimating the irradiance to determine the light conversion efficiency of the cell. The diode junction nature of the cell is clearly supported by the agreement between experiment and theory. The experiment should be exceptionally suitable for an undergraduate physics laboratory experiment.

R. H. Chow

1980-01-01T23:59:59.000Z

116

Lumen and Chromaticity Maintenance of LED PAR38 Lamps Operated in Steady-State Conditions  

SciTech Connect

The lumen depreciation and color shift of 38 different lamps (32 LED, 2 CFL, 1 ceramic metal halide [CMH], 3 halogen) were monitored in a specially developed automated long-term test apparatus (ALTA2) for nearly 14,000 hours. Five samples of each lamp model were tested, with measurements recorded on a weekly basis. The lamps were operated continuously at a target ambient temperature between 44°C and 45°C.

Royer, Michael P.

2014-12-01T23:59:59.000Z

117

Text-Alternative Version: CALiPER Series 21 on LED Linear Lamps and Troffer Lighting  

Energy.gov (U.S. Department of Energy (DOE))

Following is a text version of a video about CALiPER Application Report Series 21 on LED Linear Lamps and Troffer Lighting.

118

Text-Alternative Version: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®  

Energy.gov (U.S. Department of Energy (DOE))

Below is the text-alternative version of the LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® webcast.

119

DOE Publishes Special CALiPER Report on Retail Lamps | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

retail marketplace and targeted toward general consumers. The report follows similar reports published in 2011 and 2012. LED replacement lamps are available through many retail...

120

LED Linear Lamps and Troffer Lighting: CALiPER Report Series 21  

SciTech Connect

Video about CALiPER Report Series 21 on LED Linear Lamps and Troffer Lighting, featuring interviews with Tracy Beeson and Naomi Miller of Pacific Northwest National Laboratory.

Beeson, Tracy; Miller, Naomi

2014-06-17T23:59:59.000Z

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

The effects of supply harmonics on the performance of compact fluorescent lamps  

SciTech Connect

This paper describes a performance evaluation of ten compact fluorescent lighting systems operated with sinusoidal and distorted voltage waveform conditions. The lamps were either provided with an electronic ballast, a magnetic core ballast or a magnetic core ballast with a power factor correction circuit. The test results show that the electrical performance of the compact fluorescent lamps for both sinusoidal and distorted voltage waveform operation is related to the different types of ballast used. The cost of operation of these compact fluorescent lamps was calculated and compared to the cost of a conventional 60 W incandescent lamp.

Arseneau, R.; Ouellette, M.

1993-04-01T23:59:59.000Z

122

EA-1911: Energy Conservation Standards for Certain Reflector, Elliptical Reflector, and Bulged Reflector Incandescent Lamps  

Energy.gov (U.S. Department of Energy (DOE))

This EA will evaluate the environmental impacts of a proposal to amend energy conservation standards for Certain Reflector, Elliptical Reflector, and Bulged Reflector Incandescent Lamps.

123

J.-A. FLEMING. 2014 On the characteristic curves and surfaces of incandescence lamps (Courbes caractristiques des lampes incandescence) ; Phil. Mag.,  

E-Print Network (OSTI)

80 J.-A. FLEMING. 2014 On the characteristic curves and surfaces of incandescence lamps (Courbes caractéristiques des lampes à incandescence) ; Phil. Mag., 5e série, t. XIX, p. 368; I885. L'auteur étudie les résistance correspondant à la force électromotrice vo à laquelle l'incandescence commence à se produire, et r

Paris-Sud XI, Université de

124

Spatial and time-dependent distribution of plasma parameters in the metal-halide arc lamp.  

E-Print Network (OSTI)

Spatial and time-dependent distribution of plasma parameters in the metal-halide arc lamp. A. Khakhaev, L. Luizova, K. Ekimov and A. Soloviev Petrozavodsk State University, Russia The metal-halide arc lamp is an effective light source and its investigation has a long history, but even at present some

Paris-Sud XI, Université de

125

Demonstration Of A Monitoring Lamp To Visualize The Energy Consumption In Houses  

E-Print Network (OSTI)

Demonstration Of A Monitoring Lamp To Visualize The Energy Consumption In Houses Christophe Gisler1://www.unipg.it Abstract. We report on the development of a wireless lamp dedicated to the feedback of energy consumption is a good solution to make people gain awareness of their energy consumption and hence reduce it [1

Paris-Sud XI, Université de

126

Spectral irradiance model for tungsten halogen lamps in 340-850 nm wavelength range  

SciTech Connect

We have developed a physical model for the spectral irradiance of 1 kW tungsten halogen incandescent lamps for the wavelength range 340-850 nm. The model consists of the Planck's radiation law, published values for the emissivity of tungsten, and a residual spectral correction function taking into account unknown factors of the lamp. The correction function was determined by measuring the spectra of a 1000 W, quartz-halogen, tungsten coiled filament (FEL) lamp at different temperatures. The new model was tested with lamps of types FEL and 1000 W, 120 V quartz halogen (DXW). Comparisons with measurements of two national standards laboratories indicate that the model can account for the spectral irradiance values of lamps with an agreement better than 1% throughout the spectral region studied. We further demonstrate that the spectral irradiance of a lamp can be predicted with an expanded uncertainty of 2.6% if the color temperature and illuminance values for the lamp are known with expanded uncertainties of 20 K and 2%, respectively. In addition, it is suggested that the spectral irradiance may be derived from resistance measurements of the filament with lamp on and off.

Ojanen, Maija; Kaerhae, Petri; Ikonen, Erkki

2010-02-10T23:59:59.000Z

127

CALiPER Report 20.3: Robustness of LED PAR38 Lamps  

SciTech Connect

Three samples of 40 of the Series 20 PAR38 lamps underwent multi-stress testing, whereby samples were subjected to increasing levels of simultaneous thermal, humidity, electrical, and vibrational stress. The results do not explicitly predict expected lifetime or reliability, but they can be compared with one another, as well as with benchmark conventional products, to assess the relative robustness of the product designs. On average, the 32 LED lamp models tested were substantially more robust than the conventional benchmark lamps. As with other performance attributes, however, there was great variability in the robustness and design maturity of the LED lamps. Several LED lamp samples failed within the first one or two levels of the ten-level stress plan, while all three samples of some lamp models completed all ten levels. One potential area of improvement is design maturity, given that more than 25% of the lamp models demonstrated a difference in failure level for the three samples that was greater than or equal to the maximum for the benchmarks. At the same time, the fact that nearly 75% of the lamp models exhibited better design maturity than the benchmarks is noteworthy, given the relative stage of development for the technology.

Poplawski, Michael E.; Royer, Michael P.; Brown, Charles C.

2014-12-31T23:59:59.000Z

128

Table lamp with dynamically controlled lighting distribution and uniformly illuminated luminous shade  

DOE Patents (OSTI)

A double lamp table or floor lamp lighting system has a pair of compact fluorescent lamps (CFLs) or other lamps arranged vertically, i.e. one lamp above the other, with a reflective septum in between. By selectively turning on one or both of the CFLs, down lighting, up lighting, or both up and down lighting is produced. The control system can also vary the light intensity from each CFL. The reflective septum ensures that almost all the light produced by each lamp will be directed into the desired light distribution pattern which is selected and easily changed by the user. In a particular configuration, the reflective septum is bowl shaped, with the upper CFL sitting in the bowl, and a luminous shade hanging down from the bowl. The lower CFL provides both task lighting and uniform shade luminance. Planar compact fluorescent lamps, e.g. circular CFLs, particularly oriented horizontally, are preferable. CFLs provide energy efficiency. However, other types of lamps, including incandescent, halogen, and LEDs can also be used in the fixture. The lighting system may be designed for the home, hospitality, office or other environments.

Siminovitch, Michael J. (Pinole, CA); Page, Erik R. (Berkeley, CA)

2002-01-01T23:59:59.000Z

129

Performance of "Ultra-High" Efficient Electronic Ballast for HID Lamps  

E-Print Network (OSTI)

. Index Terms--Electronic ballast, HID lamps, resonant inverter, power loss modeling, Silicon Carbide (Si of >95% for the ballast. Diode bridge rectifier EMI filter Resonant Inverter Power Factor Correction 75423, USA Abstract--A new electronic ballast circuit for High Intensity Discharge (HID) lamps

Tolbert, Leon M.

130

190 IEEE TRANSACTIONS ON PLASMA SCIENCE, VOL. 30, NO. 1, FEBRUARY 2002 Gap Closure in a Cold Metal Halide Lamp  

E-Print Network (OSTI)

lamp has been investigated using a two-dimensional, plasma transport model. Im- ages are presented- charge devices, lighting, plasma applications. METAL halide high-intensity-discharge (HID) lamps op- erate as high-pressure thermal arcs [1]. The cold fills of HID lamps are typically 50­100 torr of a rare

Kushner, Mark

131

Lamp system with conditioned water coolant and diffuse reflector of polytetrafluorethylene(PTFE)  

DOE Patents (OSTI)

A lamp system with a very soft high-intensity output is provided over a large area by water cooling a long-arc lamp inside a diffuse reflector of polytetrafluorethylene (PTFE) and titanium dioxide (TiO.sub.2) white pigment. The water is kept clean and pure by a one micron particulate filter and an activated charcoal/ultraviolet irradiation system that circulates and de-ionizes and biologically sterilizes the coolant water at all times, even when the long-arc lamp is off.

Zapata, Luis E. (Livermore, CA); Hackel, Lloyd (Livermore, CA)

1999-01-01T23:59:59.000Z

132

American Recovery and Reinvestment Act ( ARRA) FEMP Technical Assistance, U.S. General Services Administration - Project 194 U.S. Custom Cargo Inspection Facility, Detroit, MI  

SciTech Connect

This report documents the findings of an on-site audit of the U.S. Customs Cargo Inspection Facility (CIF) in Detroit, Michigan. The federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy-efficiency opportunities that, once implemented, would reduce electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

Arends, J.; Sandusky, William F.

2010-05-31T23:59:59.000Z

133

Is the light emitting diode (LED) an ultimate lamp?  

Science Journals Connector (OSTI)

Simple diagrams are used to show the transformation of a thin “slab” of intrinsic semiconductor (direct gap k elec =k hole ) from an ideal “flat-band” photopumped recombination-radiation light source into an ultimate lamp a p–n junctionlight emitting diode(LED). A photoexcited intrinsic slab of semiconductor can be regarded as an ideal (“flat-band”) light source with however the photogenerated carriers and voltage available externally instead of as recombination radiation (light) if the slab is converted to half p type (one side) and half n type (the other side) i.e. to a p–n junction. If an equal a “bucking ” external voltage is applied resulting in an input current when the photoexcitation is removed the slab becomes again (remains) an ideal “flat-band” light source a p–n junctionLED. In practice the LED takes the form of a p–n heterostructure in order to improve electron–hole injection reduce the absorption of recombination radiation and to make possible—with proper geometries—improved photon escape.

N. Holonyak Jr.

2000-01-01T23:59:59.000Z

134

Integrated starting and running amalgam assembly for an electrodeless fluorescent lamp  

DOE Patents (OSTI)

An integrated starting and running amalgam assembly for an electrodeless SEF fluorescent lamp includes a wire mesh amalgam support constructed to jointly optimize positions of a starting amalgam and a running amalgam in the lamp, thereby optimizing mercury vapor pressure in the lamp during both starting and steady-state operation in order to rapidly achieve and maintain high light output. The wire mesh amalgam support is constructed to support the starting amalgam toward one end thereof and the running amalgam toward the other end thereof, and the wire mesh is rolled for friction-fitting within the exhaust tube of the lamp. The positions of the starting and running amalgams on the wire mesh are jointly optimized such that high light output is achieved quickly and maintained, while avoiding any significant reduction in light output between starting and running operation.

Borowiec, Joseph Christopher (Schenectady, NY); Cocoma, John Paul (Clifton Park, NY); Roberts, Victor David (Burnt Hills, NY)

1998-01-01T23:59:59.000Z

135

LED Linear Lamps and Troffer Lighting: CALiPER Report Series 21  

Energy.gov (U.S. Department of Energy (DOE))

View the video about CALiPER Report Series 21 on LED Linear Lamps and Troffer Lighting, featuring interviews with Tracy Beeson and Naomi Miller of Pacific Northwest National Laboratory.

136

DOE Publishes CALiPER Report on Lumen and Chromaticity Maintenance of LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy's CALiPER program has released Report 20.4, which is part of a series of investigations on LED PAR38 lamps. Report 20.4 focuses on lumen maintenance, chromaticity...

137

DOE Publishes CALiPER Snapshot Report on LED A Lamps  

Energy.gov (U.S. Department of Energy (DOE))

DOE's CALiPER program has released a Snapshot Report on LED A lamps, which utilizes the LED Lighting Facts program's extensive product database to help industry stakeholders understand the current state and trajectory of the market for that class

138

Text-Alternative Version: CALiPER Report Series 20 on LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

Michael Royer, Lighting Engineer, Pacific Northwest National Laboratory: The CALiPER program looks at typical LED lamp performance attributes. As we've gone through the progression of reports, we...

139

MISSION CATHODIQUE A L'INTRIEUR DES LAMPES A INCANDESCENCE ; par M. L. HOULLEVIGUE (1).  

E-Print Network (OSTI)

523 �MISSION CATHODIQUE A L'INT�RIEUR DES LAMPES A INCANDESCENCE ; par M. L. HOULLEVIGUE (1). I. Lorsqu'on survolte fortement une lampe à incandescence à filament de charbon, par exemple en mettant sous incandescent. ' , Fic.. 1. Tous ces effets peuvent être attribués, en première analyse, aux électrons émanés du

Boyer, Edmond

140

ISSUANCE 2015-01-26: Energy Conservation Program: Energy Conservation Standards for High-Intensity Lamps, Notice to Reopen Comment Period  

Energy.gov (U.S. Department of Energy (DOE))

Energy Conservation Program: Energy Conservation Standards for High-Intensity Lamps, Notice to Reopen Comment Period

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Demonstration of LED Retrofit Lamps at the Jordan Schnitzer Museum of Art  

SciTech Connect

The Jordan Schnitzer Museum of Art in Eugene, Oregon, houses a remarkable permanent collection of Asian art and antiquities, modern art, and sculpture, and also hosts traveling exhibitions. In the winter and spring of 2011, a series of digital photographs by artist Chris Jordan, titled "Running the Numbers," was exhibited in the Coeta and Donald Barker Special Exhibitions Gallery. These works graphically illustrate waste (energy, money, health, consumer objects, etc.) in contemporary culture. The Bonneville Power Administration and the Eugene Water and Electricity Board provided a set of Cree 12W light-emitting diode (LED) PAR38 replacement lamps (Cree LRP38) for the museum to test for accent lighting in lieu of their standard Sylvania 90W PAR38 130V Narrow Flood lamps (which draw 78.9W at 120V). At the same time, the museum tested LED replacement lamps from three other manufacturers, and chose the Cree lamp as the most versatile and most appropriate color product for this exhibit. The lamps were installed for the opening of the show in January 2011. This report describes the process for the demonstration, the energy and economic results, and results of a survey of the museum staff and gallery visitors on four similar clusters of art lighted separately by four PAR38 lamps.

Miller, Naomi J.

2011-09-01T23:59:59.000Z

142

Energy-Efficient, High-Color-Rendering LED Lamps Using Oxyfluoride and Fluoride Phosphors  

SciTech Connect

LED lamps using phosphor downconversion can be designed to replace incandescent or halogen sources with a 'warm-white' correlated color temperature (CCT) of 2700-3200 K and a color rendering index (CRI) greater than 90. However, these lamps have efficacies of {approx}70% of standard 'cool-white' LED packages (CCT = 4500-6000 K; CRI = 75-80). In this report, we describe structural and luminescence properties of fluoride and oxyfluoride phosphors, specifically a (Sr,Ca){sub 3}(Al,Si)O{sub 4}(F,O):Ce{sup 3+} yellow-green phosphor and a K{sub 2}TiF{sub 6}:Mn{sup 4+} red phosphor, that can reduce this gap and therefore meet the spectral and efficiency requirements for high-efficacy LED lighting. LED lamps with a warm-white color temperature (3088 K), high CRI (90), and an efficacy of {approx}82 lm/W are demonstrated using these phosphors. This efficacy is {approx}85% of comparable cool-white lamps using typical Y{sub 3}Al{sub 5}O{sub 12}:Ce{sup 3+}-based phosphors, significantly reducing the efficacy gap between warm-white and cool-white LED lamps that use phosphor downconversion.

Setlur, A.; Radkov, E; Henderson, C; Her, J; Srivastava, A; Karkada, N; Kishore, M; Kumar, N; Aesram, D; et al.

2010-01-01T23:59:59.000Z

143

L-Prize Competition Winner 60W Incandescent Replacement Lamp Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interagency Technology Deployment Working Group L Prize ® Competition Winner 60W Incandescent Replacement Lamp Update James E. Rannels, Senior Advisor L Prize Competition D&R International March 15, 2012 Cost of electricity 1 cent per kilowatt-hour The Washington Post, March 8, 2012 Page One 2 Cost of electricity 11 cents per kilowatt-hour The Washington Post, March 9, 2012 Page Two 3 What Is the L Prize? * Technology competition to spur innovation and exceptional performance * Created by Energy Independence and Security Act (EISA 2007) Sec. 655 * Two key lamp replacements: 60W Incandescent and PAR 38 Halogen * Future focus: 21 st Century Lamp * Cash prizes, federal purchasing, utility programs 4 Philips Wins First L Prize * August 3, 2011: Philips

144

L-Prize Competition Winner 60W Incandescent Replacement Lamp Update  

NLE Websites -- All DOE Office Websites (Extended Search)

Interagency Technology Deployment Working Group L Prize ® Competition Winner 60W Incandescent Replacement Lamp Update James E. Rannels, Senior Advisor L Prize Competition D&R International March 15, 2012 Cost of electricity 1 cent per kilowatt-hour The Washington Post, March 8, 2012 Page One 2 Cost of electricity 11 cents per kilowatt-hour The Washington Post, March 9, 2012 Page Two 3 What Is the L Prize? * Technology competition to spur innovation and exceptional performance * Created by Energy Independence and Security Act (EISA 2007) Sec. 655 * Two key lamp replacements: 60W Incandescent and PAR 38 Halogen * Future focus: 21 st Century Lamp * Cash prizes, federal purchasing, utility programs 4 Philips Wins First L Prize * August 3, 2011: Philips

145

Pump-lamp firing-pulse generator for solid-state lasers  

SciTech Connect

This paper describes a generator that provides, with maximum output-pulse amplitude, sequential or external firing of four INP16/250 (IFP-8000) lamps at a frequency of 1 Hz. The energy and time characteristics of the generator are improved as compared with similar devices, which provides a time instability of the delay between a generator-trigger pulse and the optical pumping pulse of + or - 1 usec. The output-pulse amplitude can be varied according to the type and number of lamps fired. Measures are taken to reduce the supply noise produced in firing-pulse generation and to increase the operating safety of the device.

Denishchik, Y.S.

1985-12-01T23:59:59.000Z

146

General Services Building Emergency Instructions  

E-Print Network (OSTI)

, or do not know the location of the shooter, hide in a locked or barricaded room and turn out the lights the emergency call Campus Security at 403-220-5333 from a safe location Hazardous Materials Spill Only attempt

de Leon, Alex R.

147

The Fuzzy Design of the Intelligent System for the Energy-Saving Lamps  

Science Journals Connector (OSTI)

In the paper, a intelligent system was proposed. It consists of variable converter and intelligent controller. Variable reactor which concludes variable reactance converter and power converter has wide applications in the soft starting, speed controlling ... Keywords: fuzzy control, variable reactor, intelligent control, power converter, Energy-Saving Lamps

Youxin Yuan; Kaihua Cui; Yiping Xiao; Tieliang Xu

2008-12-01T23:59:59.000Z

148

RF driven sulfur lamp having driving electrodes which face each other  

DOE Patents (OSTI)

A high intensity discharge lamp without mercury is disclosed radiating a selected spectrum of which can be almost entirely in the visible range from an envelope that contains a sulfur containing substance. The lamp utilizes a signal source that generates an excitation signal that is externally coupled to the exterior surface of the envelope to excite the enclosed sulfur containing substance. Various embodiments of the lamp use electrodes adjacent the envelope to couple the excitation signal thereto with the face of the electrodes shaped to complement the shape of the exterior surface of the envelope. Two shapes discussed are spherical and cylindrical. To minimize filamentary discharges each envelope may include an elongated stem affixed to the exterior thereof whereby a rotational subsystem spins the envelope. In yet another embodiment the envelope has a Dewar configuration with two electrodes, one positioned near the external curved side surface of the body, and a second to the inner surface of the hole through the envelope. Further, the envelope may contain a backfill of a selected inert gas to assist in the excitation of lamp with that backfill at a pressure of less than 1 atmosphere, wherein the backfill pressure is directly related to the increase or decrease of peak output and inversely related to the increase and decrease of the emitted spectrum from the envelope. The emitting fill can be less than 6 mg/cc, or at least 2 mg/cc of the envelope of a sulfur containing substance. 17 figs.

Gabor, G.; Orr, T.R.; Greene, C.M.; Crawford, D.G.; Berman, S.M.

1999-06-22T23:59:59.000Z

149

15 KJ FLASH LAMP, POWER CONDITIONING UNIT DESIGNED FOR SAFTY, RELIABILITY & MANUFACTURABILITY*  

SciTech Connect

A 15kJoule, Flash Lamp Power Conditioning Unit has been successfully designed, developed, and deployed in the National Ignition Facility (NIF) Preamplifier Modules (PAM). The primary design philosophy of this power conditioning unit (PCU) is safety, reliability, and manufacturability. Cost reduction over commercially equivalent systems was also achieved through an easily manufactured packaging design optimized to meet NIF requirements. While still maintaining low cost, the PCU design includes a robust control system, fault diagnostic system, and safety features. The pulsed power design includes 6 PFN modules, each including a dual series injection trigger transformer, that drive a total of 12 flash lamp loads. The lamps are individually triggered via a 20kV pulse produced by a 1kV, MCT switched capacitive discharge unit on the primary side of the trigger transformer. The remote control interface includes an embedded controller that captures flash lamp current wave forms and fault status for each shot. The embedded controller provides the flexibility of remotely adjusting both the main drive voltage from 1.6 to 2.5 kV and the trigger voltage from 0 to 20 kV.

James, G; Merritt, B; Dreifuerst, G; Strickland, S

2007-08-07T23:59:59.000Z

150

Laboratory for Advanced Materials Processing University of Maryland http://www.enma.umd.edu/LAMP  

E-Print Network (OSTI)

) = Rs x (L / W), with Rs: sheet resistance of a layer of this material The sheet resistance is expressedLaboratory for Advanced Materials Processing � University of Maryland http Operating Procedure for LAMP four point probe sheet resistance measurements Overview of 4 point probe

Rubloff, Gary W.

151

Report 20.3: Stress Testing of LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

A small sample of each of the Application Summary Report 20 PAR38 lamp types underwent stress testing that included substantial temperature and humidity changes, electrical variation, and vibration. The results do not directly address expected lifetime, but can be compared with one another, as well as with benchmark conventional products, to assess the relative robustness of the product designs. (24 pages, December 2014)

152

Method and apparatus for powering an electrodeless lamp with reduced radio frequency interference  

DOE Patents (OSTI)

An electrodeless lamp waveguide structure includes tuned absorbers for spurious RF signals. A lamp waveguide with an integral frequency selective attenuation includes resonant absorbers positioned within the waveguide to absorb spurious out-of-band RF energy. The absorbers have a negligible effect on energy at the selected frequency used to excite plasma in the lamp. In a first embodiment, one or more thin slabs of lossy magnetic material are affixed to the sidewalls of the waveguide at approximately one quarter wavelength of the spurious signal from an end wall of the waveguide. The positioning of the lossy material optimizes absorption of power from the spurious signal. In a second embodiment, one or more thin slabs of lossy magnetic material are used in conjunction with band rejection waveguide filter elements. In a third embodiment, one or more microstrip filter elements are tuned to the frequency of the spurious signal and positioned within the waveguide to couple and absorb the spurious signal's energy. All three embodiments absorb negligible energy at the selected frequency and so do not significantly diminish the energy efficiency of the lamp.

Simpson, James E. (Gaithersburg, MD)

1999-01-01T23:59:59.000Z

153

Method and apparatus for powering an electrodeless lamp with reduced radio frequency interference  

DOE Patents (OSTI)

An electrodeless lamp waveguide structure includes tuned absorbers for spurious RF signals. A lamp waveguide with an integral frequency selective attenuation includes resonant absorbers positioned within the waveguide to absorb spurious out-of-band RF energy. The absorbers have a negligible effect on energy at the selected frequency used to excite plasma in the lamp. In a first embodiment, one or more thin slabs of lossy magnetic material are affixed to the sidewalls of the waveguide at approximately one quarter wavelength of the spurious signal from an end wall of the waveguide. The positioning of the lossy material optimizes absorption of power from the spurious signal. In a second embodiment, one or more thin slabs of lossy magnetic material are used in conjunction with band rejection waveguide filter elements. In a third embodiment, one or more microstrip filter elements are tuned to the frequency of the spurious signal and positioned within the waveguide to couple and absorb the spurious signal's energy. All three embodiments absorb negligible energy at the selected frequency and so do not significantly diminish the energy efficiency of the lamp. 18 figs.

Simpson, J.E.

1999-06-08T23:59:59.000Z

154

Predicted Pulsed-Power/Flash-Lamp Performance of the NIF Main Amplifier  

SciTech Connect

The laser glass for the National Ignition Facility (NIF) Main Amplifier system is pumped by a system of 192 pulsed power/flash lamp assemblies. Each of these 192 assemblies consists of a 1.6 MJ (nominal) capacitor bank working with a Pre-Ionization/Lamp Check (PILC) pulser to drive an array of 40 flash lamps. This paper describes the predicted performance of these Power Conditioning System (PCS) modules in concert with flashlamp assemblies in NIF. Each flashlamp assembly consists of 20 parallel sets of lamps in series pairs. The sensitivity of system performance to various design parameters of the PILC pulser and the main capacitor bank is described. Results of circuit models are compared to sub-scale flashlamp tests and to measurements taken in tests of a PCS module driving a flashlamp assembly in the First Article NIF Test Module facility at Sandia National Laboratories. Also included are predictions from a physics-based, semi-empirical amplifier gain code.

Fulkerson, E. Steven; Hammond, Jud; Harjes, Henry C.; Moore, William B.S.; Smith, David L.; Wilson, J. Michael

1999-06-22T23:59:59.000Z

155

Issues, Models and Solutions for Triac Modulated Phase Dimming of LED Lamps  

E-Print Network (OSTI)

greater than incandescent lamps [1,2]. In fact, recent technological breakthroughs [3-7] in the high of LED lighting: An incandescent source produces 10 ­ 20 lumens/watt, while several manufacturers have? Incandescent bulbs primarily utilize phase modulating dimming through triac switches to control the power sent

Lehman, Brad

156

Hands On Science with NOAA TITLE: Plate Tectonics and Lava Lamps  

E-Print Network (OSTI)

and geological events?" Answer = heat from radioactive decay · Compare the light bulb in lava to Earth's internal in the lava lamp. · Plot recent earthquakes and volcanic activity on a world map and compare to the location.education.noaa.gov/Ocean_and_Coasts/Ocean_Floor_Features.html USGS Earthquake Hazards - http

157

Energy Savings and NOx Emissions Reduction Potential from the 2012 Federal Legislation to Phase Out Incandescent Lamps in Texas  

E-Print Network (OSTI)

Lamps in Texas Description Value Reference Total Housing Units in Texas in 2013: 10,204,056 Real Estate Center, Texas A&M University3, U.S. Census Bureau4 5 Average Lighting Electricity Usage per House: 1,946 kWh/yr NREL Building America Program6... Savings in Texas: 10,424,973 MWh/yr OSD CFL Savings in Texas: 28,562 MWh/day By 2013, it is estimated that total savings of 10,424,973 MWh/yr would be achieved from replacing incandescent lamps with compact fluorescent lamps (CFL) in residential...

Liu, Zi; Baltazar, Juan Carlos; Haberl, Jeff; Soman, Rohit

158

LED lamp or bulb with remote phosphor and diffuser configuration with enhanced scattering properties  

DOE Patents (OSTI)

An LED lamp or bulb is disclosed that comprises a light source, a heat sink structure and an optical cavity. The optical cavity comprises a phosphor carrier having a conversions material and arranged over an opening to the cavity. The phosphor carrier comprises a thermally conductive transparent material and is thermally coupled to the heat sink structure. An LED based light source is mounted in the optical cavity remote to the phosphor carrier with light from the light source passing through the phosphor carrier. A diffuser dome is included that is mounted over the optical cavity, with light from the optical cavity passing through the diffuser dome. The properties of the diffuser, such as geometry, scattering properties of the scattering layer, surface roughness or smoothness, and spatial distribution of the scattering layer properties may be used to control various lamp properties such as color uniformity and light intensity distribution as a function of viewing angle.

Tong, Tao; Le Toquin, Ronan; Keller, Bernd; Tarsa, Eric; Youmans, Mark; Lowes, Theodore; Medendorp, Jr., Nicholas W; Van De Ven, Antony; Negley, Gerald

2014-11-11T23:59:59.000Z

159

Xenon flash lamp pumped self-frequency doubling NYAB pulsed laser  

Science Journals Connector (OSTI)

Neodymium doped yttrium aluminum borate (NYAB) crystals with sizes up to 45mm have been grown successfully. NYAB rod of 4 ? 12mm was pumped by xenon flash lamp, and several mJ of 0.53?m green laser output was obtained. The oscillation threshold, the pulse duration, the laser beam polarization, and the laser beam divergence were measured to be 78mJ, 100ns, 90% and 2mrad, respectively.

Luo Zundu; Jiang Aidong; Huang Yichuan; Qiu Minwang

1989-01-01T23:59:59.000Z

160

2015-01-28 Issuance: Test Procedure for Fluorescent Lamp Ballasts; Final Rule Correction  

Energy.gov (U.S. Department of Energy (DOE))

This document is a pre-publication Federal Register final rule correction regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 28, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Household Light Makes Global Heat: High Black Carbon Emissions From Kerosene Wick Lamps  

Science Journals Connector (OSTI)

(3) Lighting is another component of this household energy challenge, with millions of households still relying on simple liquid-fueled lamps, but little is known of the associated environmental and health impacts. ... For laboratory tests, CO2 and CO concentrations were measured in real-time with a Li-COR 6252 (Li-COR Biosciences, Lincoln, NE) and Horiba AIA-220 (Horiba, Kyoto, Japan) nondispersive infrared (NDIR) analyzer, respectively. ...

Nicholas L. Lam; Yanju Chen; Cheryl Weyant; Chandra Venkataraman; Pankaj Sadavarte; Michael A. Johnson; Kirk R. Smith; Benjamin T. Brem; Joseph Arineitwe; Justin E. Ellis; Tami C. Bond

2012-11-19T23:59:59.000Z

162

Creating markets for new products to replace incandescent lamps: The international experience  

SciTech Connect

Since the summer of 1995, several organizations have been in pursuit of what many consider the Holy Grail of lighting technology--a low-cost, drop-in, energy-efficient replacement for the incandescent lamp. This paper summarizes the international experience in attempting to catalyze the commercialization of a mass-market, replacement product that could have major impact on residential lighting energy consumption in US and EU homes. The technology procurement effort was originally spearheaded by US Federal Government through a loose collaboration between the Department of Defense (DoD), the Environmental Protection Agency (EPA) and the Department of Energy (DOE). The DoD agreed to serve as the anchor buyer for a low-cost, drop-in replacement product for standard-sized light bulbs that provide at least 30 percent energy savings compared to traditional incandescent lamps. In parallel to the US effort, the International Energy Agency launched a co-operative technology procurement effort by assembling large buyers' groups in Finland, the Netherlands, Sweden, and the United Kingdom to pull a similar efficient lighting product into the European market. The lukewarm response from lamp manufacturers to these two technology procurement efforts illustrates the challenges of transforming residential lighting from incandescent to efficient lighting.

Rubinstein, F.; Borg, N.; Horowitz, N.; Narel, T.; Morehouse, E.T. Jr.

1998-07-01T23:59:59.000Z

163

Performance of a novel LED lamp arrangement to reduce SNR fluctuation for multi-user visible light communication systems  

Science Journals Connector (OSTI)

This paper investigates the performance of our recently proposed LED lamp arrangement to reduce the SNR fluctuation from different locations in the room for multi-user visible light...

Wang, Zixiong; Yu, Changyuan; Zhong, Wen-De; Chen, Jian; Chen, Wei

2012-01-01T23:59:59.000Z

164

A New Rb Lamp Exciter Circuit for Rb atomic clocks and Studies on Transition from Ring to Red mode  

E-Print Network (OSTI)

In this paper we describe the development of novel RF exciter circuit for electrode less Rb lamp. The lamp exciter circuit is a RF oscillator with a a new configuration operating at 60 to 65 MHz frequency with 3 to 4 watt power. The Rb lamp is used in exciting the ground state hyperfine transitions in Rb atom in a glass cell placed inside a tuned microwave cavity, As the frequency of these hyperfine transitions is very stable it is used in the development of Rb atomic clock by phase locking the oven controlled crystal oscillator (OCXO) to this atomic transition frequency. The details of the Rb lamp exciter are presented in the paper.The Lamp is ideally operated in ring mode as in this mode the linewidth is narrow and there is no self reversal. However, high temperature and RF excitation power may drive the Rb lamp to red mode which gives rise to line broadening and self reversal. It is the experience that mode change from ring to red deteriorates the atomic signal strength and S/N. In this paper the reasons of mode change are also discussed.

Savita Singh; Bikash Ghosal; G M Saxena

2010-11-10T23:59:59.000Z

165

Mercury Vapor Release from Broken Compact Fluorescent Lamps and In Situ Capture by New Nanomaterial Sorbents  

Science Journals Connector (OSTI)

There is one report of Hg poisoning (acrodynia) in a child exposed to broken tube-type fluorescents in a detailed case study presented by Tunnessen et al. (6). ... Similar release patterns but lower amounts were seen for spent bulbs (example result 90 ?g in 24 h) or from the fracture site of a new bulb after glass removal to simulate cleanup. ... Artificial lighting systems are transitioning from incandescent to compact fluorescent lamp (CFL) and light-emitting diode (LED) bulbs in response to the U.S. Energy Independence and Security Act and the EU Ecodesign Directive, which leads to energy ... ...

Natalie C. Johnson; Shawn Manchester; Love Sarin; Yuming Gao; Indrek Kulaots; Robert H. Hurt

2008-06-27T23:59:59.000Z

166

2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking  

Energy.gov (U.S. Department of Energy (DOE))

This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

167

2014-04-11 Issuance: Energy Conservation Standards for General...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Conservation Standards for General Service Fluorescent Lamps and Incandescent Reflector Lamps; Notice of Proposed Rulemaking 2014-04-11 Issuance: Energy Conservation...

168

Influence of the lamp filling on the pumping conditions in a pulsed YAG:Nd3+ laser  

Science Journals Connector (OSTI)

The pumping conditions in pulsed YAG:Nd3+ lasers are determined, to a great extent, by the filling and the discharge conditions in the pump lamps. It is reported that the highest efficiency under free-oscillation conditions was obtained when krypton discharge lamps were used. These lamps had a discharge gap 60 mm long and 5 mm in diameter. They emitted flashes of about 200 ?sec duration. The best results were obtained when the initial gas pressure was ~1000 torr and the discharge energy was W ~ 100–150 J. The efficiency was lower when the value of W was either larger or smaller. The nature of the filling had little effect on the laser efficiency when xenon and krypton lamps were used to provide energies W close to the nominal value of 250 J. The pumping conditions could not be improved significantly by the use of other fillings (inert gases or their mixtures were used). The principal results obtained were valid also when the lamps were operated at a repetition frequency of ? ? 10 Hz.

Vitalii M Podgaetskii; B V Skvortsov; A N Tokareva

1971-01-01T23:59:59.000Z

169

Method of controlling the mercury vapor pressure in a photo-chemical lamp or vapor filter used for Hg.sup.196 enrichment  

DOE Patents (OSTI)

The present invention is directed to a method of eliminating the cold spot zones presently used on Hg.sup.196 isotope separation lamps and filters by the use of a mercury amalgams, preferably mercury - indium amalgams. The use of an amalgam affords optimization of the mercury density in the lamp and filter of a mercury enrichment reactor, particularly multilamp enrichment reactors. Moreover, the use of an amalgam in such lamps and/or filters affords the ability to control the spectral line width of radiation emitted from lamps, a requirement for mercury enrichment.

Grossman, Mark W. (Belmont, MA)

1993-01-01T23:59:59.000Z

170

Method of controlling the mercury vapor pressure in a photo-chemical lamp or vapor filter used for Hg[sup 196] enrichment  

DOE Patents (OSTI)

The present invention is directed to a method of eliminating the cold spot zones presently used on Hg[sup 196] isotope separation lamps and filters by the use of a mercury amalgams, preferably mercury - indium amalgams. The use of an amalgam affords optimization of the mercury density in the lamp and filter of a mercury enrichment reactor, particularly multilamp enrichment reactors. Moreover, the use of an amalgam in such lamps and/or filters affords the ability to control the spectral line width of radiation emitted from lamps, a requirement for mercury enrichment.

Grossman, M.W.

1993-02-16T23:59:59.000Z

171

DOE Publishes Final Rule for the Request for Exclusion of 100 Watt R20 Short Incandescent Reflector Lamps from Energy Conservation Standards  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy has published a final rule regarding the request for exclusion of 100 Watt R20 short incandescent reflector lamps from energy conservation standards.

172

A theoretical study of the incandescent filament lamp performance under voltage flicker  

SciTech Connect

Incandescent filament lamp flicker, produced by voltage fluctuation, is a power quality problem that caused engineering concern since the onset of electrical illumination technology. The flicker phenomenon was analyzed and explained in early studies. Standards dealing with acceptable flicker levels are well known, nevertheless, today the discussion about flicker continues to be a top priority topic due to the fact that steady-state and transient voltage waveform distortion is a growing problem in low and medium voltage systems. In many situations voltage flicker is caused by subharmonics and interharmonics of voltage. Cycloconverters, welders and arc furnaces, eccentrically operating tools and integral cycle controlled power equipment are notorious for producing voltage flicker. The goal of this paper is to provide solid mathematical basis for the analytical modeling of incandescent filament lamp flicker when the voltage is nonsinusoidal. A mathematical model that enables the evaluation of the luminous flux modulation caused by noninteger harmonics (subharmonics and interharmonics) is presented. Three situations are detailed: square-wave voltage modulation, sinusoidal modulation and the case of noninteger harmonics with nearly contiguous frequencies.

Peretto, L. [Univ. of Bologna (Italy)] [Univ. of Bologna (Italy); Emanuel, A.E. [Worcester Polytechnic Inst., MA (United States)] [Worcester Polytechnic Inst., MA (United States)

1997-01-01T23:59:59.000Z

173

The Model 5000-16C 1000 WATT FEL Lamp Standard pro-vides absolute calibration of spectral irradiance from 250 nm to  

E-Print Network (OSTI)

The Model 5000-16C 1000 WATT FEL Lamp Standard pro- vides absolute calibration of spectral. It has been selected by the National Institute of Standards and Technology to replace the 1000 watt, DXW-pin 1000 watt lamp that is adapted by Gamma Scientific into a bi-post configuration. It is used

174

Effect of helium addition on discharge characteristics in a flat fluorescent lamp  

SciTech Connect

The discharge characteristics of a multielectrode dual coplanar in a mercury-free flat fluorescent lamp were investigated using brightness-efficiency measurement and the infrared (IR) spectrum and intensified charge coupled device (ICCD) characteristics. The level of brightness was above 14 900 cd/m{sup 2} under the conditions of neon--50% xenon-8% He gas composition, 150 Torr pressure, and 20 kHz alternating current pulse. The ICCD results revealed a faster and wider discharge with a Ne-50% Xe-8% He gas composition. The effect of adding helium (He) to Ne-50% Xe revealed a faster peak emission, as confirmed by ICCD images. From the gated IR emission spectrum, the intensity ratio of I{sub 823nm}/I{sub 828nm} was {approx}8% higher with Ne-50% Xe-8% He than with Ne-50% Xe under the same pressure and applied voltage conditions.

Lee, Seong-Eui; Lee, Ho-Nyeon; Park, Hyoung-Bin; Lee, Kyo Sung; Choi, Kyung Cheol [Materials and Devices Research Center, Samsung Advanced Institute of Technology, Suwon 440-600 (Korea, Republic of); Department of Electronics Engineering, Sejong University, Seoul 143-747 (Korea, Republic of); Department of Electrical Engineering and Computer Science, Korea Advanced Institute of Science and Technology (KAIST), Daejeon 305-701 (Korea, Republic of)

2005-11-01T23:59:59.000Z

175

A Novel High-Power-Factor LED-Lamp Driver Based on a Single-Stage Power Conversion  

Science Journals Connector (OSTI)

This paper proposes a novel single-stage driver for supplying a T8-type light-emitting diode (LED) lamp with high power factor. The presented driver integrates a dual buck-boost converter with coupled inductors and a half-bridge series-resonant converter ... Keywords: converter, driver, light-emitting diode (LED)

Chun An Cheng, En Chih Chang, Ching Shien Tseng, Tsung Yuan Chung

2014-06-01T23:59:59.000Z

176

New Energy Efficiency Standards for Metal Halide Lamp Fixtures to Save on Energy Bills and Reduce Carbon Pollution  

Office of Energy Efficiency and Renewable Energy (EERE)

As part of the Energy Department’s efforts to develop efficiency standards that cut carbon pollution and save money by saving energy, U.S. Energy Secretary Ernest Moniz announced that the Department has finalized new energy efficiency standards for metal halide lamp fixtures.

177

Calendar Year 2008 Program Benefits for ENERGY STAR Labeled Products  

E-Print Network (OSTI)

reports power savings from incandescent/CFL lamp replacementreplacement of a 65 W incandescent lamp with a 16 W compactthe equivalent of 109 W incandescent lamp, the average of

Homan, GregoryK

2010-01-01T23:59:59.000Z

178

Calendar Year 2007 Program Benefits for ENERGY STAR Labeled Products  

E-Print Network (OSTI)

weighted average across incandescent, CFL, and non-ENERGYreports power savings from incandescent/CFL lamp replacementreplacement of a 65 W incandescent lamp with a 16 W compact

Sanchez, Marla Christine

2008-01-01T23:59:59.000Z

179

DOE CALiPER Program, Report 21.2: Linear (T8) LED Lamp Performance in Five Types of Recessed Troffers  

SciTech Connect

Although lensed troffers are numerous, there are many other types of optical systems as well. This report looked at the performance of three linear (T8) LED lamps chosen primarily based on their luminous intensity distributions (narrow, medium, and wide beam angles) as well as a benchmark fluorescent lamp in five different troffer types. Also included are the results of a subjective evaluation. Results show that linear (T8) LED lamps can improve luminaire efficiency in K12-lensed and parabolic-louvered troffers, effect little change in volumetric and high-performance diffuse-lensed type luminaires, but reduce efficiency in recessed indirect troffers. These changes can be accompanied by visual appearance and visual comfort consequences, especially when LED lamps with clear lenses and narrow distributions are installed. Linear (T8) LED lamps with diffuse apertures exhibited wider beam angles, performed more similarly to fluorescent lamps, and received better ratings from observers. Guidance is provided on which luminaires are the best candidates for retrofitting with linear (T8) LED lamps.

Miller, Naomi J.; Perrin, Tess E.; Royer, Michael P.; Wilkerson, Andrea M.; Beeson, Tracy A.

2014-05-20T23:59:59.000Z

180

Color stable phosphors for LED lamps and methods for preparing them  

SciTech Connect

An LED lamp includes a light source configured to emit radiation with a peak intensity at a wavelength between about 250 nm and about 550 nm; and a phosphor composition configured to be radiationally coupled to the light source. The phosphor composition includes particles of a phosphor of formula I, said particles having a coating composition disposed on surfaces thereof; ((Sr.sub.1-zM.sub.z).sub.1-(x+w)A.sub.wCe.sub.x).sub.3(Al.sub.1-ySi.sub.y-)O.sub.4+y+3(x-w)F.sub.1-y-3(x-w) I wherein the coating composition comprises a material selected from aluminum oxide, magnesium oxide, calcium oxide, barium oxide, strontium oxide, zinc oxide, aluminum hydroxide, magnesium hydroxide, calcium hydroxide, barium hydroxide, strontium hydroxide, zinc hydroxide, aluminum phosphate, magnesium phosphate, calcium phosphate, barium phosphate, strontium phosphate, and combinations thereof; and A is Li, NA, K, or Rb, or a combination thereof; M is Ca, Ba, Mg, Zn, or a combination thereof; and 0

Murphy, James Edward; Setlur, Anant Achyut; Camardello, Samuel Joseph

2013-11-26T23:59:59.000Z

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Iterative Boltzmann plot method for temperature and pressure determination in a xenon high pressure discharge lamp  

SciTech Connect

The Boltzmann plot method allows to calculate plasma temperatures and pressures if absolutely calibrated emission coefficients of spectral lines are available. However, xenon arcs are not very well suited to be analyzed this way, as there are only a limited number of lines with atomic data available. These lines have high excitation energies in a small interval between 9.8 and 11.5 eV. Uncertainties in the experimental method and in the atomic data further limit the accuracy of the evaluation procedure. This may result in implausible values of temperature and pressure with inadmissible uncertainty. To omit these shortcomings, an iterative scheme is proposed that is making use of additional information about the xenon fill pressure. This method is proved to be robust against noisy data and significantly reduces the uncertainties. Intentionally distorted synthetic data are used to illustrate the performance of the method, and measurements performed on a laboratory xenon high pressure discharge lamp are analyzed resulting in reasonable temperatures and pressures with significantly reduced uncertainties.

Zalach, J.; Franke, St. [INP Greifswald, Felix-Hausdorff-Str. 2, 17489 Greifswald (Germany)

2013-01-28T23:59:59.000Z

182

Analysis of Na and Ba in an atomic fluorescence method with excitation by a pulsed dye laser with lamp pumping  

SciTech Connect

Among the laser methods used in atomic spectroscopy, atomic fluorescence resonance spectroscopy together with an atomic ionization technique make it possible to work with individual atoms. This paper reports on the determination of Na and Ba in aqueous solutions of their salts with atomic fluorescence analysis performed wih a dye laser and lamp pumping, the pulse of generation having a length of 1-2 usec. The detection limit of elements in atomic fluorescence analysis performed wih dye lasers with lamp pumping can be reduced by increasing the spectral density of the laser radiation through narrowing the line of generation, by employing other dyes to excite lines of greater intensity, by improving the recording system of the fluorescence spectra, and by improving the atomization of the samples to be analyzed.

Kukvshim, V.G.

1986-04-01T23:59:59.000Z

183

Design and Realize of the Graphics Platform for LED Lamps’ Layout Based on GDI+ and Dual-Buffer  

Science Journals Connector (OSTI)

Based on the GDI+ class library and dual-buffer technology of .NET framework, the software for LED lamps’ layout is developed. On the basis of determining the scheme of layout platform, the metafile class library model by Composite design-set and the process of calling the LED pixels metafile symbol interface are designed firstly. The design method of realizing the LED pixels metafile visual editing on the drawn LED logical pixel based on GDI+ is analyzed. The dual-buffer technology is used to solve the problem of flicker when fast refreshing. The testing results show that the platform can meet the basic function requirements of engineering application, and realize partial adjust on the process of LED lamps layout without distortion.

Wen Yuanmei; Nie Xinming; Liu Guixiong

2012-01-01T23:59:59.000Z

184

Mechanical design of PlayLamp : a minimally intrusive device for recording the behavior of children at-risk of developmental disorders  

E-Print Network (OSTI)

This thesis paper documents the design process, decisions, and outcomes of the design of the physical form factor of PlayLamp, a device for video and audio recording the development of children at-risk of having developmental ...

Steger, Stephen Andrew

2008-01-01T23:59:59.000Z

185

CALiPER Report 20.1: Subjective Evaluation of Beam Quality, Shadow Quality, and Color Quality for LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

This December 3, 2013 webinar explored the findings of CALiPER 20.1: Subjective Evaluation of Beam Quality, Shadow Quality, and Color Quality for LED PAR38 Lamps and discussed what attributes to...

186

Local Resistance Profiling of Ultra Shallow Junction Annealed with Combination of Spike Lamp and Laser Annealing Processes using Scanning Spreading Resistance Microscope  

SciTech Connect

Local resistance profiles of ultra shallow boron and arsenic implanted into silicon with energies of 2.0 and 4.0 keV and doses of 2.0x10{sup 15} and 1.0x10{sup 15} ions/cm{sup 2} activated by a combination of conventional spike lamp and laser annealing processes were measured by scanning spreading resistance microscope (SSRM) with a depth resolution of less than 10 nm. The lowest local resistance at the low resistance region in 2.0 keV boron implanted silicon with 1050 deg. C spike lamp annealing followed by 0.35 kW/mm{sup 2} laser annealing was half of that without laser annealing. The lowest local resistance at the low resistance region in the arsenic implanted silicon activated by 1050 deg. C spike lamp annealing followed by 0.39 kW/mm{sup 2} laser annealing was 74% lower than that followed by 0.36 kW/mm{sup 2} laser annealing. The lowest local resistances at the low resistance regions in the arsenic implanted silicon with 0.36 and 0.39 kW/mm{sup 2} laser annealing followed by 1050 deg. C spike lamp annealing were 41 and 33% lower than those with spike lamp annealing followed by laser annealing. Laser annealing followed by spike lamp annealing could suppress the diffusion of the impurities and was suitable for making the ultra shallow and low resistance regions.

Abo, Satoshi; Nishikawa, Kazuhisa; Ushigome, Naoya; Wakaya, Fujio; Takai, Mikio [Center for Quantum Science and Technology under Extreme Conditions, Osaka University, 1-3, Machikaneyama, Toyonaka, Osaka, 560-8531 (Japan); Iwamatsu, Toshiaki; Oda, Hidekazu [Advanced Device Technology Department, Production and Technology Unit, Devices and Analysis Technology Division, Renesas Electronics Corporation, 751, Horiguchi, Hitachinaka, Ibaraki, 312-8504 (Japan)

2011-01-07T23:59:59.000Z

187

GENERAL SERVICES ADMINISTRATION PUBLIC BUILDINGS SERVICE  

E-Print Network (OSTI)

8. SALARIES 9. FUEL ("x" one) OIL GAS COAL ELECTRIC 10. SYSTEM MAINTENANCE AND REPAIR C. ELECTRICAL/OR MANAGER 23. SECURITY (Watchmen, guards, not janitors) 24. SOCIAL SECURITY TAX AND WORKMEN'S COMPENSATION

188

General Services Administration Public Utility Contracting  

Energy.gov (U.S. Department of Energy (DOE))

Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—discusses the government utility bill, utility service characteristics, utility energy service contract (UESC) requirements, supplier diversity requirement, subcontracting plan requirements, reporting requirements, and the Subcontracting Orientation and Assistance Reviews (SOARs).

189

Observed Minimum Illuminance Threshold for Night Market Vendors in Kenya who use LED Lamps  

SciTech Connect

Creation of light for work, socializing, and general illumination is a fundamental application of technology around the world. For those who lack access to electricity, an emerging and diverse range of LED based lighting products hold promise for replacing and/or augmenting their current fuel-based lighting sources that are costly and dirty. Along with analysis of environmental factors, economic models for total cost-ofownership of LED lighting products are an important tool for studying the impacts of these products as they emerge in markets of developing countries. One important metric in those models is the minimum illuminance demanded by end-users for a given task before recharging the lamp or replacing batteries. It impacts the lighting service cost per unit time if charging is done with purchased electricity, batteries, or charging services. The concept is illustrated in figure 1: LED lighting products are generally brightest immediately after the battery is charged or replaced and the illuminance degrades as the battery is discharged. When a minimum threshold level of illuminance is reached, the operational time for the battery charge cycle is over. The cost to recharge depends on the method utilized; these include charging at a shop at a fixed price per charge, charging on personal grid connections, using solar chargers, and purchasing dry cell batteries. This Research Note reports on the observed"charge-triggering" illuminance level threshold for night market vendors who use LED lighting products to provide general and task oriented illumination. All the study participants charged with AC power, either at a fixed-price charge shop or with electricity at their home.

Johnstone, Peter; Jacobson, Arne; Mills, Evan; Radecsky, Kristen

2009-03-21T23:59:59.000Z

190

Glass and glass-derivative seals for use in energy-efficient fuel cells and lamps  

SciTech Connect

For solid oxide fuel cells (SOFC), a series of 18 sealing glasses have been prepared and characterized. From the whole design space, several glasses were ''downselected'' and studied in detail to describe their behaviors in simulated fuel cell environments. One of the glasses was found to outperform all others, including the well-known G18 sealant developed at Pacific Northwest National Laboratory. The new glass composition showed lower bulk electrical conductivity, excellent sealing and wetting behavior when sealing under applied load, and qualitatively superior performance when exposed to wet hydrogen for 800 hours. Traditional melting was used to prepare all of the glasses that were studied in detail. The sol-gel approach was used to synthesize several compositions, but it was found that the glasses crystallized very rapidly during heating, precluding sealing. The glass characterization included measurements of the viscosity and thermal expansion of the glasses, as well as the thermal expansion of the partly crystalline glass ceramics. In addition, the wetting and sintering behavior of all glasses has been measured, as well as the crystallization behavior. The time and temperature at which crystalline phases form from the glasses has been determined for all of the glasses. Each glass ceramic contains at least two crystalline phases, and most of the crystalline phases have been positively identified. The body of fundamental data provides a platform for future developments for high temperature sealants, and the newly-developed glass compositions appear promising for large-scale testing. The second component of the work, focused on seals for higher-temperature discharge lighting, has focused on determining the phase relations in the yttria-alumina-silica system at various silica levels. Functional testing of one of the candidate sealants demonstrated that it performs well in current HID lighting applications. Further testing is required to evaluate its performance in next-generation lamps that operate at higher temperatures, but the baseline phase equilibria and crystallization behavior has been established for additional development. Again, traditional melting and sol-gel synthesis have been employed, and the sol-gel method was successful for preparing new phases that were discovered during the work. Four new phases have been identified and synthesized in pure form, from which full structure solutions were obtained as well as the anisotropic thermal expansion for each phase.

Scott Misture; Arun Varshineya; Matthew Hall; Sylvia DeCarr; Steve Bancheri

2005-07-28T23:59:59.000Z

191

Potential Environmental Impacts from the Metals in Incandescent, Compact Fluorescent Lamp (CFL), and Light-Emitting Diode (LED) Bulbs  

Science Journals Connector (OSTI)

Artificial lighting systems are transitioning from incandescent to compact fluorescent lamp (CFL) and light-emitting diode (LED) bulbs in response to the U.S. Energy Independence and Security Act and the EU Ecodesign Directive, which leads to energy savings and reduced greenhouse gas emissions. ... The CFLs and LEDs have higher resource depletion and toxicity potentials than the incandescent bulb due primarily to their high aluminum, copper, gold, lead, silver, and zinc. ... mercury pollution; redn. in electricity demand from the substitution of incandescent bulbs with fluorescents leads to reduced mercury emissions during the use of the bulb. ...

Seong-Rin Lim; Daniel Kang; Oladele A. Ogunseitan; Julie M. Schoenung

2012-12-13T23:59:59.000Z

192

2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking  

Energy.gov (U.S. Department of Energy (DOE))

This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding test procedures for high-intesity discharge lamps, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

193

Y YEAR  

National Nuclear Security Administration (NNSA)

5 79 -7.06% YEAR 2013 2014 Males 59 57 -3.39% Females 26 22 -15.38% YEAR 2013 2014 SES 1 0 -100% EJEK 4 3 -25.00% EN 05 3 2 -33.33% EN 04 22 22 0% EN 03...

194

Y YEAR  

National Nuclear Security Administration (NNSA)

2 40 -4.76% YEAR 2013 2014 Males 37 35 -5.41% Females 5 5 0% YEAR 2013 2014 SES 2 2 0% EJEK 5 4 -20.00% EN 05 5 7 40.00% EN 04 6 6 0% EN 03 1 1 0% NN...

195

Y YEAR  

National Nuclear Security Administration (NNSA)

91 81 -10.99% YEAR 2013 2014 Males 67 56 -16.42% Females 24 25 4.17% YEAR 2013 2014 SES 1 2 100% EJEK 9 8 -11.11% EN 04 25 22 -12.00% NN (Engineering) 24...

196

A numerical study of the supply mode effects on high-pressure mercury discharge lamp dynamic thermal behavior  

SciTech Connect

This paper presents a numerical study of the dynamic behavior of high-pressure mercury discharge lamp as a function of supply mode. Bidimensional time-dependent equations have been solved by using a semi-implicit finite-element code. The model has been developed in the frame of the local thermodynamic equilibrium hypothesis. After validation by using experimental data from the literature, this model was applied to analyze the effects of some key parameters such as frequency for an ac arc current and the ratio cycle parameter for square arc-current wave form on the convective process. The results obtained have been used to analyze the dynamic thermal behavior of high-pressure mercury plasma (pressure equal to 0.3 MPa) working under currents widely different in frequency and wave form.

Kaziz, S.; Ahmed, R. Ben; Araoud, Z.; Gazzah, M.H.; Charrada, K.; Said, R. [EMIR, IPEIM, route de Skanes, 5019 Monastir (Tunisia); FSM, avenue de l'environnement, 5019 Monastir (Tunisia); EMIR, IPEIM, route de Skanes, 5019 Monastir (Tunisia)

2005-06-15T23:59:59.000Z

197

Jade Sky Technologies Partners with CLTC on LED Replacement Lamp Upgrade Project UC Davis' California Lighting Technology Center will utilize Jade Sky Technologies' driver ICs to help spur  

E-Print Network (OSTI)

Jade Sky Technologies Partners with CLTC on LED Replacement Lamp Upgrade Project UC Davis of cost-effective, easy-to-use LED lighting solutions Milpitas, Calif. ­ October 15, 2013 ­ Jade Sky Technologies (JST), a clean-tech start-up manufacturer of driver ICs for LED lighting applications, announces

California at Davis, University of

198

Solid-state lighting : lamp targets and implications for the semiconductor chip.  

SciTech Connect

A quiet revolution is underway. Over the next 5-10 years inorganic-semiconductor-based solid-state lighting technology is expected to outperform first incandescent, and then fluorescent and high-intensity-discharge, lighting. Along the way, many decision points and technical challenges will be faced. To help understand these challenges, the U.S. Department of Energy, the Optoelectronics Industry Development Association and the National Electrical Manufacturers Association recently updated the U.S. Solid-State Lighting Roadmap. In the first half of this paper, we present an overview of the high-level targets of the inorganic-semiconductor part of that update. In the second half of this paper, we discuss some implications of those high-level targets on the GaN-based semiconductor chips that will be the 'engine' for solid-state lighting.

Tsao, Jeffrey Yeenien

2003-08-01T23:59:59.000Z

199

Potential Impact of Adopting Maximum Technologies as Minimum Efficiency Performance Standards in the U.S. Residential Sector  

E-Print Network (OSTI)

and general lighting incandescent services (GLIS) areLighting Phase out of incandescent lighting has been passedout of general service incandescent lamps (GSIL) which don’t

Letschert, Virginie

2010-01-01T23:59:59.000Z

200

Facility for high-heat flux testing of irradiated fusion materials and components using infrared plasma arc lamps  

Science Journals Connector (OSTI)

A new high-heat flux testing (HHFT) facility using water-wall stabilized high-power high-pressure argon plasma arc lamps (PALs) has been developed for fusion applications. It can accommodate irradiated plasma facing component materials and sub-size mock-up divertor components. Two PALs currently available at Oak Ridge National Laboratory can provide maximum incident heat fluxes of 4.2 and 27 MW m?2, which are prototypic of fusion steady state heat flux conditions, over a heated area of 9 ? 12 and 1 ? 10 cm2, respectively. The use of PAL permits the heat source to be environmentally separated from the components of the test chamber, simplifying the design to accommodate safe testing of low-level irradiated articles and materials under high-heat flux. Issues related to the operation and temperature measurements during testing of tungsten samples are presented and discussed. The relative advantages and disadvantages of this photon-based HHFT facility are compared to existing e-beam and particle beam facilities used for similar purposes.

Adrian S Sabau; Evan K Ohriner; Jim Kiggans; David C Harper; Lance L Snead; Charles R Schaich

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Facility for high heat flux testing of irradiated fusion materials and components using infrared plasma arc lamps  

SciTech Connect

A new high-heat flux testing facility using water-wall stabilized high-power high-pressure argon Plasma Arc Lamps (PALs) has been developed for fusion applications. It can handle irradiated plasma facing component materials and mock-up divertor components. Two PALs currently available at ORNL can provide maximum incident heat fluxes of 4.2 and 27 MW/m2 over a heated area of 9x12 and 1x10 cm2, respectively, which are fusion-prototypical steady state heat flux conditions. The facility will be described and the main differences between the photon-based high-heat flux testing facilities, such as PALs, and the e-beam and particle beam facilities more commonly used for fusion HHF testing are discussed. The components of the test chamber were designed to accommodate radiation safety and materials compatibility requirements posed by high-temperature exposure of low levels irradiated tungsten articles. Issues related to the operation and temperature measurements during testing are presented and discussed.

Sabau, Adrian S [ORNL] [ORNL; Ohriner, Evan Keith [ORNL] [ORNL; Kiggans, Jim [ORNL] [ORNL; Harper, David C [ORNL] [ORNL; Snead, Lance Lewis [ORNL] [ORNL; Schaich, Charles Ross [ORNL] [ORNL

2014-01-01T23:59:59.000Z

202

DOE CALiPER Program, Report 20.1 Subjective Evaluation of Beam Quality, Shadow Quality, and Color Quality for LED PAR38 Lamps  

SciTech Connect

This report focuses on human-evaluated characteristics, including beam quality, shadow quality, and color quality. Using a questionnaire that included rank ordering, opinions on 27 of the Report 20 PAR38 lamps were gathered during a demonstration event for members of the local Illuminating Engineering Society (IES) chapter. This was not a rigorous scientific experiment, and the data should not be extrapolated beyond the scope of the demonstration. The results suggest that many of the LED products compared favorably to halogen PAR38 benchmarks in all attributes considered. LED lamps using a single-emitter design were generally preferred for their beam quality and shadow quality, and the IES members ranking of color quality did not always match the rank according to the color rendering index (CRI).

Royer, Michael P.; Poplawski, Michael E.; Miller, Naomi J.

2013-10-01T23:59:59.000Z

203

Results from the Carbon-Land Model Intercomparison Project (C-LAMP) and Availability of the Data on the Earth System Grid (ESG)  

SciTech Connect

This paper describes the Carbon-Land Model Intercomparison Project (C-LAMP) being carried out through a collaboration between the Community Climate System Model (CCSM) Biogeochemistry Working Group, a DOE SciDAC-2 project, and the DOE Program for Climate Model Diagnosis and Intercomparison (PCMDI). The goal of the project is to intercompare terrestrial biogeochemistry models running within the CCSM framework to determine the best set of processes to include in future versions of CCSM. As a part of the project, observational datasets are being collected and used to score the scientific performance of these models following a well-defined set of metrics. In addition, metadata standards for terrestrial biosphere models are being developed to support archival and distribution of the C-LAMP model output via the Earth System Grid (ESG). Progress toward completion of this project and preliminary results from the first set of experiments are reported.

Hoffman, Forrest M [ORNL; Covey, Curtis [Lawrence Livermore National Laboratory (LLNL); Fung, Inez [University of California, Berkeley; Randerson, Jim [University of California, Irvine; Thornton, Peter [National Center for Atmospheric Research (NCAR); Lee, Jeff [National Center for Atmospheric Research (NCAR); Rosenbloom, Nan [National Center for Atmospheric Research (NCAR); Stockli, Reto [Colorado State University, Fort Collins; Running, Steven [University of Montana, Missoula; Bernholdt, David E [ORNL; Williams, Dean [Lawrence Livermore National Laboratory (LLNL)

2007-01-01T23:59:59.000Z

204

DOE/EA-1664: Environmental Assessment for 10 CFR 430 Energy Conservation Standards: Energy Conservation Standards for Fluorescent and Incandescent Lamps (June 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Environmental Assessment for 10 CFR Part 430 Energy Conservation Standards: Energy Conservation Standards for Fluorescent and Incandescent Lamps June 2009 16-i CHAPTER 16. ENVIRONMENTAL ASSESSMENT TABLE OF CONTENTS 16.1 INTRODUCTION ......................................................................................................... 16-1 16.2 AIR EMISSIONS ANALYSIS...................................................................................... 16-1 16.2.1 Air Emissions Descriptions............................................................................................ 16-1 16.2.2 Air Quality Regulation................................................................................................... 16-3 16.2.3 Global Climate Change..................................................................................................

205

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network (OSTI)

Commercial Central AC and Heat Pumps Refrigerators and Freezers Room Air Conditioners Fluorescent Lamp efficiency standards program and described the historical impact on regional electricity use, Commercial Refrigeration Equipment, Commercial Vending Machines General Service Fluorescent Lamps

206

CX-011406: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Notice of Proposed Rulemaking for Energy Conservation Standards for General Service Fluorescent Lamps and Incandescent Reflector Lamps CX(s) Applied: B5.1 Date: 11/21/2013 Location(s): Nationwide Offices(s): Golden Field Office

207

Student ID Advisor 1st Year Fall __________ (year) 1st Year Spr. __________ (year) 1st Year Sum. __________ (year)  

E-Print Network (OSTI)

Name Major Student ID Advisor 1st Year Fall __________ (year) 1st Year Spr. __________ (year) 1st) Projected Graduation Date SUBJECT SUBJECT CR. HRS. SUBJECT COURSE # CR. HRS. Advisor Signature Date Student

Barrash, Warren

208

Phosphors for LED lamps  

SciTech Connect

A phosphor, a phosphor blend including the phosphor, a phosphor prepared by a process, and a lighting apparatus including the phosphor blend are disclosed. The phosphor has the formula (Ca.sub.1-p-qCe.sub.pK.sub.q).sub.xSc.sub.y(Si.sub.1-rGa.sub.r).sub.zO.su- b.12+.delta. or derived from a process followed using disclosed amounts of reactants. In the formula, (0

Murphy, James Edward; Manepalli, Satya Kishore; Kumar, Prasanth Nammalwar

2013-08-13T23:59:59.000Z

209

The Carbon-Land Model Intercomparison Project (C-LAMP): A Model-Data Comparison System for Evaluation of Coupled Biosphere-Atmosphere Models  

SciTech Connect

The need to capture important climate feebacks in general circulation models (GCMs) has resulted in new efforts to include atmospheric chemistry and land and ocean biogeochemistry into the next generation of production climate models, now often referred to as Earth System Models (ESMs). While many terrestrial and ocean carbon models have been coupled to GCMs, recent work has shown that such models can yield a wide range of results, suggesting that a more rigorous set of offline and partially coupled experiments, along with detailed analyses of processes and comparisons with measurements, are warranted. The Carbon-Land Model Intercomparison Project (C-LAMP) provides a simulation protocol and model performance metrics based upon comparisons against best-available satellite- and ground-based measurements (Hoffman et al., 2007). C-LAMP provides feedback to the modeling community regarding model improvements and to the measurement community by suggesting new observational campaigns. C-LAMP Experiment 1 consists of a set of uncoupled simulations of terrestrial carbon models specifically designed to examine the ability of the models to reproduce surface carbon and energy fluxes at multiple sites and to exhibit the influence of climate variability, prescribed atmospheric carbon dioxide (CO{sub 2}), nitrogen (N) deposition, and land cover change on projections of terrestrial carbon fluxes during the 20th century. Experiment 2 consists of partially coupled simulations of the terrestrial carbon model with an active atmosphere model exchanging energy and moisture fluxes. In all experiments, atmospheric CO{sub 2} follows the prescribed historical trajectory from C{sup 4}MIP. In Experiment 2, the atmosphere model is forced with prescribed sea surface temperatures (SSTs) and corresponding sea ice concentrations from the Hadley Centre; prescribed CO{sub 2} is radiatively active; and land, fossil fuel, and ocean CO{sub 2} fluxes are advected by the model. Both sets of experiments have been performed using two different terrestrial biogeochemistry modules coupled to the Community Land Model version 3 (CLM3) in the Community Climate System Model version 3 (CCSM3): The CASA model of Fung, et al., and the carbon-nitrogen (CN) model of Thornton. Comparisons against Ameriflus site measurements, MODIS satellite observations, NOAA flask records, TRANSCOM inversions, and Free Air CO{sub 2} Enrichment (FACE) site measurements, and other datasets have been performed and are described in Randerson et al. (2009). The C-LAMP diagnostics package was used to validate improvements to CASA and CN for use in the next generation model, CLM4. It is hoped that this effort will serve as a prototype for an international carbon-cycle model benchmarking activity for models being used for the Inter-governmental Panel on Climate Change (IPCC) Fifth Assessment Report. More information about C-LAMP, the experimental protocol, performance metrics, output standards, and model-data comparisons from the CLM3-CASA and CLM3-CN models are available at http://www.climatemodeling.org/c-lamp.

Hoffman, Forrest M [ORNL; Randerson, Jim [University of California, Irvine; Thornton, Peter E [ORNL; Mahowald, Natalie [Cornell University; Bonan, Gordon [National Center for Atmospheric Research (NCAR); Running, Steven [University of Montana, Missoula; Fung, Inez [University of California, Berkeley

2009-01-01T23:59:59.000Z

210

Tungsten and tungsten alloy powder metallurgy: Powder production and applications excluding lamps. (Latest citations from the US Patent bibliographic file with exemplary claims). Published Search  

SciTech Connect

The bibliography contains citations of selected patents concerning the preparation of metallic and ceramic powders of tungsten and tungsten alloys, including applications of these materials. The hydrogen reduction of tungsten compounds together with alloying element compounds produce forms with characteristics of high density, hardness, wear resistance, high melting points, and abrasiveness. Topics include production of cathodes, heaters, filament wires, electrical contacts, acoustic absorbers, high-density sheets and coatings, hard penetrators, and tungsten carbide and metallized ceramics. Tungsten halogen lamps are examined in a separate bibliography.(Contains 50-250 citations and includes a subject term index and title list.) (Copyright NERAC, Inc. 1995)

NONE

1997-01-01T23:59:59.000Z

211

Tungsten and tungsten alloy powder metallurgy: Powder production and applications excluding lamps. (Latest citations from the US Patent database). Published Search  

SciTech Connect

The bibliography contains citations of selected patents concerning the preparation of metallic and ceramic powders of tungsten and tungsten alloys, including applications of these materials. The hydrogen reduction of tungsten compounds together with alloying element compounds produce forms with characteristics of high density, hardness, wear resistance, high melting points, and abrasiveness. Topics include production of cathodes, heaters, filament wires, electrical contacts, acoustic absorbers, high-density sheets and coatings, hard penetrators, and tungsten carbide and metallized ceramics. Tungsten halogen lamps are examined in a separate bibliography. (Contains a minimum of 97 citations and includes a subject term index and title list.)

Not Available

1993-05-01T23:59:59.000Z

212

Tungsten and tungsten alloy powder metallurgy: Powder production and applications excluding lamps. (Latest citations from the US Patent bibliographic file with exemplary claims). Published Search  

SciTech Connect

The bibliography contains citations of selected patents concerning the preparation of metallic and ceramic powders of tungsten and tungsten alloys, including applications of these materials. The hydrogen reduction of tungsten compounds together with alloying element compounds produce forms with characteristics of high density, hardness, wear resistance, high melting points, and abrasiveness. Topics include production of cathodes, heaters, filament wires, electrical contacts, acoustic absorbers, high-density sheets and coatings, hard penetrators, and tungsten carbide and metallized ceramics. Tungsten halogen lamps are examined in a separate bibliography.(Contains 50-250 citations and includes a subject term index and title list.) (Copyright NERAC, Inc. 1995)

NONE

1995-12-01T23:59:59.000Z

213

Tungsten and tungsten alloy powder metallurgy: Powder production and applications excluding lamps. (Latest citations from the US Patent bibliographic file with exemplary claims). Published Search  

SciTech Connect

The bibliography contains citations of selected patents concerning the preparation of metallic and ceramic powders of tungsten and tungsten alloys, including applications of these materials. The hydrogen reduction of tungsten compounds together with alloying element compounds produce forms with characteristics of high density, hardness, wear resistance, high melting points, and abrasiveness. Topics include production of cathodes, heaters, filament wires, electrical contacts, acoustic absorbers, high-density sheets and coatings, hard penetrators, and tungsten carbide and metallized ceramics. Tungsten halogen lamps are examined in a separate bibliography. (Contains a minimum of 115 citations and includes a subject term index and title list.)

NONE

1995-02-01T23:59:59.000Z

214

Business Case for Energy Efficiency in Support of Climate Change Mitigation, Economic and Societal Benefits in India  

E-Print Network (OSTI)

Equipment years years Incandescent Lamps (Residential)W CFL 4hr/day Chinese Data Incandescent Lamps (Commercial)and Industrial End Uses Incandescent Lamps Refrigerators Air

McNeil, Michael A.

2013-01-01T23:59:59.000Z

215

EA-1664: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

64: Final Environmental Assessment 64: Final Environmental Assessment EA-1664: Final Environmental Assessment 10 CFR Part 430 Energy Conservation Standards: Energy Conservation Standards for Fluorescent and Incandescent Lamps The U.S. Department of Energy has determined that the adoption of energy conservation standards for General Service Fluorescent Lamps and Incandescent Reflector Lamps as described in the final rule titled the "energy Conservation Program: Energy Conservation Standards for General Service Fluorescent Lamps and Incandescent Reflector lamps," would not be a major federal action significantly affecting the quality of the human environment. Environmental Assessment for 10 CFR Part 430 Energy Conservation Standards: Energy Conservation Standards for Fluorescent and Incandescent Lamps,

216

Thorium, uranium and rare earth elements content in lanthanide concentrate (LC) and water leach purification (WLP) residue of Lynas advanced materials plant (LAMP)  

SciTech Connect

Lynas Advanced Materials Plant (LAMP) has been licensed to produce the rare earths elements since early 2013 in Malaysia. LAMP processes lanthanide concentrate (LC) to extract rare earth elements and subsequently produce large volumes of water leach purification (WLP) residue containing naturally occurring radioactive material (NORM). This residue has been rising up the environmental issue because it was suspected to accumulate thorium with significant activity concentration and has been classified as radioactive residue. The aim of this study is to determine Th-232, U-238 and rare earth elements in lanthanide concentrate (LC) and water leach purification (WLP) residue collected from LAMP and to evaluate the potential radiological impacts of the WLP residue on the environment. Instrumental Neutron Activation Analysis and ?-spectrometry were used for determination of Th, U and rare earth elements concentrations. The results of this study found that the concentration of Th in LC was 1289.7 ± 129 ppm (5274.9 ± 527.6Bq/kg) whereas the Th and U concentrations in WLP were determined to be 1952.9±17.6 ppm (7987.4 ± 71.9 Bq/kg) and 17.2 ± 2.4 ppm respectively. The concentrations of Th and U in LC and WLP samples determined by ?- spectrometry were 1156 ppm (4728 ± 22 Bq/kg) and 18.8 ppm and 1763.2 ppm (7211.4 Bq/kg) and 29.97 ppm respectively. This study showed that thorium concentrations were higher in WLP compare to LC. This study also indicate that WLP residue has high radioactivity of {sup 232}Th compared to Malaysian soil natural background (63 - 110 Bq/kg) and come under preview of Act 304 and regulations. In LC, the Ce and Nd concentrations determined by INAA were 13.2 ± 0.6% and 4.7 ± 0.1% respectively whereas the concentrations of La, Ce, Nd and Sm in WLP were 0.36 ± 0.04%, 1.6%, 0.22% and 0.06% respectively. This result showed that some amount of rare earth had not been extracted and remained in the WLP and may be considered to be reextracted.

AL-Areqi, Wadeeah M., E-mail: walareqi@yahoo.com; Majid, Amran Ab., E-mail: walareqi@yahoo.com; Sarmani, Sukiman, E-mail: walareqi@yahoo.com [Nuclear Science Programme, School of Chemical Sciences and Food Technology, Faculty of Science and Technology, Universiti Kebangsaan Malaysia, 43600 Bangi (Malaysia)

2014-02-12T23:59:59.000Z

217

General Services Administration Photovoltaics Project in Sacramento, California  

NLE Websites -- All DOE Office Websites (Extended Search)

GS-09P-06-KSC-3029 PHOTOVOLTAIC POWER PURCHASE, FB 2800 COTTAGE WAY SACRAMENTO GS-09P-06-KSC-3029 PHOTOVOLTAIC POWER PURCHASE, FB 2800 COTTAGE WAY SACRAMENTO PART 1 (SECTIONS B THROUGH H) TABLE OF CONTENTS 1. DESCRIPTION OF SERVICES AND BACKGROUND ...............................................................................3 2. PERIOD OF PERFORMANCE ....................................................................................................................... 4 3. PRICE SCHEDULE .......................................................................................................................................... 4 4. USE OF FEDERAL BUILDING ROOF .......................................................................................................... 5 5. ACCESS TO SITE DURING CONSTRUCTION PHASE .............................................................................5

218

General Services Administration Photovoltaics Project in Sacramento, California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GS-09P-06-KSC-3029 PHOTOVOLTAIC POWER PURCHASE, FB 2800 COTTAGE WAY SACRAMENTO GS-09P-06-KSC-3029 PHOTOVOLTAIC POWER PURCHASE, FB 2800 COTTAGE WAY SACRAMENTO PART 1 (SECTIONS B THROUGH H) TABLE OF CONTENTS 1. DESCRIPTION OF SERVICES AND BACKGROUND ...............................................................................3 2. PERIOD OF PERFORMANCE ....................................................................................................................... 4 3. PRICE SCHEDULE .......................................................................................................................................... 4 4. USE OF FEDERAL BUILDING ROOF .......................................................................................................... 5 5. ACCESS TO SITE DURING CONSTRUCTION PHASE .............................................................................5

219

FALL SPRING FALL SPRING FALL SPRINGFALL SPRING YEAR 1 YEAR 2 YEAR 3 YEAR 4  

E-Print Network (OSTI)

B FALL SPRING FALL SPRING FALL SPRINGFALL SPRING YEAR 1 YEAR 2 YEAR 3 YEAR 4 ECHM 100 (CHBE 100) 2). There is a pre- requisite of M-273Q (MATH 224). CHMY-373 (CHEM 324) could be taken Spring of year 3. Also, CHMY Math Placement ExamB M-172-Q (MATH 182) 4 cr Chemical Engineering Prerequisite Flowchart Catalog: 2010

Lawrence, Rick L.

220

FALL SPRING FALL SPRING FALL SPRINGFALL SPRING YEAR 1 YEAR 2 YEAR 3 YEAR 4  

E-Print Network (OSTI)

B FALL SPRING FALL SPRING FALL SPRINGFALL SPRING YEAR 1 YEAR 2 YEAR 3 YEAR 4 CHBE 100 2 cr CHMY-141 324) could be taken Spring of year 3. Also, CHMY-371 (CHEM 323) may be substituted for CHMY-373 (CHEM Engineering Prerequisite Flowchart Catalog: 2008-2010 updated 2009 rev. 06/29/10, rwl ­ new course numbers E

Lawrence, Rick L.

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall Spring Fall  

E-Print Network (OSTI)

) Social World Elective2 (3) Technical Elective5 CHEMICAL ENGINEERING Curriculum for Spring SemesterFirst & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall1 Spring1 Fall Spring Fall For your Freshman and Sophomore years, students should follow

Mountziaris, T. J.

222

EA-1664: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Finding of No Significant Impact 4: Finding of No Significant Impact EA-1664: Finding of No Significant Impact Energy Conservation Standards: Energy Conservation Standards for Fluorescent and Incandescent Lamps The U.S. Department of Energy has determined that the adoption of energy conservation standards for General Service Fluorescent Lamps and Incandescent Reflector Lamps as described in the final rule titled the "energy Conservation Program: Energy Conservation Standards for General Service Fluorescent Lamps and Incandescent Reflector lamps," would not be a major federal action significantly affecting the quality of the human environment. Finding of No Significant Impact for 10 CFR Part 430 Energy Conservation Standards: Energy Conservation Standards for Fluorescent and Incandescent

223

Foundation Year Aguideforinternationalstudents  

E-Print Network (OSTI)

Foundation Year Aguideforinternationalstudents #12;2 Contents TheFoundationYears 5 Engineering/Physics/Geophysics FoundationYear 6 ScienceFoundationYear 7 EntryRequirements 8 Moneymatters 10 Universitylife 10 The-termcommitmentandabig investmentinyourfuture.OurFoundationYearsare designedtoprepareyouforundergraduatestudyandto

Molinari, Marc

224

Foundation Year Aguideforstudents  

E-Print Network (OSTI)

Foundation Year Aguideforstudents #12;2 Contents TheFoundationYears 5 Engineering/Physics/Geophysics FoundationYear 6 ScienceFoundationYear 7 EntryRequirements 8 Moneymatters 10 Universitylife 10 TheUniversity 10 Thecity 10 Accommodation 10 Studentaccommodation MontefioreHouse4.. #12;3 OurFoundation

Anderson, Jim

225

Year 1 Year 2 Year 3 Year 4 Children's Hospital of  

E-Print Network (OSTI)

Year 1 Year 2 Year 3 Year 4 July General Pediatric Children's Hospital of Michigan High Risk Obstetrics Hutzel Women's Hospital Biochemical Genetics Lab/Metabolic Clinic Harper Hospital/ Children's Hospital of Michigan Reproductive Genetics Hutzel Women's Hospital August General Pediatric Children

Finley Jr., Russell L.

226

FALL SPRING FALL SPRING FALL SPRING FALL SPRING FALL Year 1 Year 2 Year 3 Year 4 Year 5  

E-Print Network (OSTI)

FALL SPRING FALL SPRING FALL SPRING FALL SPRING FALL Year 1 Year 2 Year 3 Year 4 Year 5 CORE W to meet BioE Engineering Elective Reqt. (c) ­ course used to meet ChE Techical Elective Reqt Revised 11

Lawrence, Rick L.

227

Annual Site Environmental Report Calendar Year 2007  

SciTech Connect

This report summarizes the environmental status of Ames Laboratory for calendar year 2007. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies 11 buildings owned by the Department of Energy (DOE). See the Laboratory's Web page at www.external.ameslab.gov for locations and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2007, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2007. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2007. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2003. Included in these efforts were battery and CRT recycling, waste white paper and green computer paper-recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, styrofoam peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Self Assessment Report, on its Affirmative Procurement Performance Measure. A performance level of 'A' was achieved in 2007 for Integrated Safety, Health, and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts.

Dan Kayser-Ames Laboratory

2007-12-31T23:59:59.000Z

228

Secretary Moniz's First Year  

Energy.gov (U.S. Department of Energy (DOE))

Check out our new interactive timeline to recap top moments from Energy Secretary Ernest Moniz's first year in office.

229

Secretary Moniz's First Year  

Energy.gov (U.S. Department of Energy (DOE))

We're looking back at some of the biggest moments from Energy Secretary Ernest Moniz's first year in office.

230

Year 1 Year 2 Anne 3 Anne 4 Year 5 Year 6 Year 7Year 3 Year 4 INGENIEUR POLYTECHNICIENINGENIEUR POLYTECHNICIEN  

E-Print Network (OSTI)

: Biology / Chemistry / Computer Science / Economics / Energy / Mechanics and Environmental Sciences / Mathematics and Applied Mathematics / Physics / Science, Technology & Society / Software Systems / Innovation Duration: 2 years - Possibility to be directly admitted to Year 2 Master of ScienceMaster of Science #12

Cengarle, María Victoria

231

Allocation Year Rollover  

NLE Websites -- All DOE Office Websites (Extended Search)

Allocation Year Rollover Allocation Year Rollover Allocation Year Rollover: 2013 to 2014 Note: Allocation Year 2013 (AY13) ends at 23:59:59 on Monday, January 13, 2014. AY14 runs from Tuesday, January 14, 2014 through Monday, January 12, 2015. Below are major changes that will go into effect with the beginning of AY14 on Tuesday, January 14, 2014. All times listed are PST. Scheduled System Downtimes There will be no service disruption during the allocation year rollover this year. Interactive and batch use will continue uninterrupted (except for "premium" jobs on Hopper; see below). Charging Across AY Boundary All batch jobs will continue running during the rollover. Time accrued before midnight will be charged to AY13 repos; time accrued after midnight will be charged to AY14 repos. Running batch jobs that are associated with

232

Applied Science and Technology Task Order Fiscal Year 2008 Year...  

Energy Savers (EERE)

8 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End...

233

Applied Science and Technology Task Order Fiscal Year 2009 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End...

234

Applied Science and Technology Task Order Fiscal Year 2010 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End...

235

Applied Science and Technology Task Order Fiscal Year 2011 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End...

236

Project Year Project Team  

E-Print Network (OSTI)

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

237

Project Year Project Team  

E-Print Network (OSTI)

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

238

References : Appendices : From the Lab to the Marketplace-Ten Years Later  

NLE Websites -- All DOE Office Websites (Extended Search)

References References From the Lab to the Marketplace Ten Years Later, Energy Efficient Technologies from Research at the Lawrence Berkeley National Laboratory Berkeley Lab logo (left) with six rows of gray dots transitioning to a line art drawing of a cityscape and residential houses. References General Lawrence Berkeley National Laboratory. From the Lab to the Marketplace: Making America's Buildings More Energy-Efficient. PUB-758, Revised March 1995. National Research Council. Energy Research at DOE: Was It Worth It? National Academy Press, Washington D.C., 2001. Lighting Ballasts Verderber, R.R. Electronic High Frequency Fluorescent Ballasts (Past, Present and Future). Energy Cost Avoidance in Education Buildings Conference, LBL-28792, 1990. Verderber, R.R. Fluorescent Lamp Fixtures and Ballasts. EPRI Lighting and

239

Previous Year Awards  

NLE Websites -- All DOE Office Websites (Extended Search)

Awards Awards Previous Year Awards 2013 Allocation Awards This page lists the allocation awards for NERSC for the 2013 allocation year (Jan 8, 2013 through Jan 13, 2014). Read More » NERSC Initiative for Scientific Exploration (NISE) 2013 Awards NISE is a mechanism used for allocating the NERSC reserve (10% of the total allocation). In 2013 we made the second year of the two-year awards made in 2012, supplemented by projects selected by the NERSC director. Read More » Data Intensive Computing Pilot Program 2012/2013 Awards NERSC's new data-intensive science pilot program is aimed at helping scientists capture, analyze and store the increasing stream of scientific data coming out of experiments, simulations and instruments. Read More » 2012 Allocation Awards This page lists the allocation awards for NERSC for the 2012 allocation

240

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Experience of the Städtische Werke AG (the Municipal Utility of the City of Kassel, Germany) with Rebate Programmes for Energy-Efficient Household Appliances and Lamps Over the Last 4 Years  

Science Journals Connector (OSTI)

Please permit me to commence with a brief presentation of our company and the city of Kassel (201,500 habitants). Geographically speaking, Kassel is in the centre of Germany and thus right in the middle of Eur...

Günther Frey

1999-01-01T23:59:59.000Z

242

Annual Site Environmental Report Calendar Year 2010  

SciTech Connect

This report summarizes the environmental status of Ames Laboratory for calendar year 2010. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. In 2010, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local regulations and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2010. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2010. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2010. Included in these efforts were battery and CRT recycling, miscellaneous electronic office equipment, waste white paper and green computer paper-recycling and corrugated cardboard recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, foamed polystyrene peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Performance Evaluation Measurement Plan, on its Affirmative Procurement Performance Measure. A performance level of 'A-' was achieved in 2010 for Integrated Safety, Health and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System (EMS) has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts. The Laboratory's EMS was audited in April 2009 by DOE-CH. There were four 'Sufficiently in Conformity' findings as a result of the audit. All four findings were tracked in the Laboratory's corrective action database for completion. Beryllium was used routinely at Ames Laboratory in the 1940's and 1950's in processes developed for the production of highly pure uranium and thorium in support of the historic Manhattan Project. Laboratory metallurgists also worked on a process to produce pure beryllium metal from beryllium fluoride. In the early 1950's, beryllium oxide powder was used to produce shaped beryllium and crucibles. As a result of that work, beryllium contamination now exists in many interstitial spaces (e.g., utility chases) and ventilation systems in Wilhelm, Spedding and Metals Development buildings. Extensive characterization and remediation efforts have occurred in 2009 and 2010 in order to better understand the extent of the contamination. Analysis of extensive sampling data suggests that a fairly wide dispersion of beryllium occurred (most likely in the 1950's and 60's) in Wilhelm Hall and in certain areas of Spedding Hall and Metals Development. Area air-sampling results and work-area surface characterizations indicate the exposure potential to current workers, building visitors and the public remains extremely low. This information is now used to guide cleaning efforts and to provide worker protection during remodeling and maintenance activities. Results were shared with the DOE's Former Worker Program to support former worker medical test

Kayser, Dan

2011-01-31T23:59:59.000Z

243

Tungsten and tungsten-alloy powder metallurgy: Powder production and applications-excluding lamps. November 1971-July 1989 (Citations from the US Patent data base). Report for November 1971-July 1989  

SciTech Connect

This bibliography contains citations of selected patents concerning the preparation of metallic and ceramic powders of tungsten and tungsten alloys including various applications of these materials. The hydrogen reduction of tungsten compounds together with alloying-element compounds produce forms with characteristics of high density, hardness, wear resistance, high melting points, and abrasiveness. Topics include production of various cathodes, heaters, filament wires, electrical contacts, acoustic absorbers, high-density sheets and coatings, hard penetrators, and tungsten carbide and metallized ceramics. Tungsten halogen lamps are examined in a separate bibliography. (Contains 60 citations fully indexed and including a title list.)

Not Available

1989-10-01T23:59:59.000Z

244

Project Year Project Title  

E-Print Network (OSTI)

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

245

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

246

Project Year Project Title  

E-Print Network (OSTI)

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

247

Project Year Project Team  

E-Print Network (OSTI)

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

248

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

249

Project Year Project Title  

E-Print Network (OSTI)

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

250

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

251

Project Year Project Title  

E-Print Network (OSTI)

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

252

Project Year Project Title  

E-Print Network (OSTI)

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

253

Project Year Spring 2009  

E-Print Network (OSTI)

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

254

Through the years  

NLE Websites -- All DOE Office Websites (Extended Search)

Through the years Through the years Early 1960s Researchers at PNL (now called PNNL) developed the standards and devices for setting and measuring radiation doses received by nuclear industry work- ers. Tens of thousands of people, including children, have been mea- sured by whole-body counters since the 1960s to relate their physical content of radioactive materials to sources such as food and water. 1960s PNL formulated the first use of a digital computer for complete process control of a mass spectrometer. Mid-1960s PNL devised a computer code, called COBRA for COolant Boiling in Rod Arrays, which allowed for three-dimensional, multiphase hydrothermal modeling of reactor and other complex systems. 1967 PNL researchers continued the fundamental scientific and

255

40 Years of Discovery  

SciTech Connect

History is most interesting when seen through the eyes of those who lived it. In this 40th anniversary retrospective of bioscience research at Lawrence Livermore National Laboratory, we've asked 19 scientists to share their personal recollections about a major accomplishment in the program's history. We have not tried to create a comprehensive or seamless story. Rather, we've attempted to capture the perspectives of key individuals, each of whom worked on a research program that met significant milestones. We have focused particularly on programs and accomplishments that have shaped the current Biology and Biotechnology Research Program (BBRP). In addition, we have included a timeline of biosciences at LLNL, a history of the directorate that appeared in the Laboratory's magazine, ''Science & Technology Review'', in 2002, and a list of bioscience-related articles that have appeared over the years in ''Science & Technology Review and its predecessor, Energy & Technology Review''. The landscape of biological science today is stunningly different from 40 years ago. When LLNL bioscience began in 1963, we knew about the structure of DNA and that it was the carrier of genetic information. However, it would be another year before scientists would understand how DNA codes for the production of proteins and more than a decade before the earliest DNA sequence would be known. It is sometimes difficult to remember that it was only 15 years ago that the polymerase chain reaction, a synthetic method to amplify pieces of DNA was developed, and that only within the last half-dozen years has sequence data for entire organisms begun to be available. In this publication, we have tried to capture some of the landmark and seminal research history: radiation effects studies, which were a major reason for founding the biological research program, and flow sorting and chromosome painting, which dramatically changed our ability to study DNA damage and enabled the creation of chromosome-specific clone libraries, a key step toward sequencing the human genome. Several histories relate to the Human Genome Project itself and surrounding technologies, and several to long-standing research themes such as DNA repair, food mutagens, and reproductive biology. Others describe more recent developments such as computational biology, health-care technologies, and biodefense research.

Weinstein, B; Heller, A

2003-07-08T23:59:59.000Z

256

CALIFORNIA LIGHTING TECHNOLOGY CENTER, UC DAVIS PHONE: (530) 747-3838 FAX: (530) 747-3812 CLTC.UCDAVIS.EDU DOES YOUR LAMP MEET THE  

E-Print Network (OSTI)

CALIFORNIA LIGHTING TECHNOLOGY CENTER, UC DAVIS PHONE: (530) 747-3838 FAX: (530) 747-3812 CLTC years with free replacement 3 years #12;ABOUT THE CALIFORNIA LIGHTING TECHNOLOGY CENTER, UC DAVIS: CLTC was developed by the California Energy Commission in collaboration with the California Public Utilities

California at Davis, University of

257

,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...  

U.S. Energy Information Administration (EIA) Indexed Site

2009 " ,"(Megawatts and Percent)" ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

258

,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...  

U.S. Energy Information Administration (EIA) Indexed Site

2008 " ,"(Megawatts and Percent)" ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

259

Annual Site Environmental Report Calendar Year 2005  

SciTech Connect

This report summarizes the environmental status of Ames Laboratory for calendar year 2005. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies 11 buildings owned by the Department of Energy (DOE). See the Laboratory's Web page at www.external.ameslab.gov for locations and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2005, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled accordingly to all applicable EPA, State, Local and DOE Orders. The most recent RCRA inspection was conducted by EPA Region VII in January 1999. The Laboratory received a notice of violation (NOV) which included five citations. There have been no inspections since then. The citations were minor and were corrected by the Laboratory within the time allocated by the EPA. See correspondence in Appendix D. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2005. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2005. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. Pollution awareness, waste minimization and recycling programs were implemented in 1990 and updated in 2003. Included in these efforts were battery and CRT recycling, waste white paper and green computer paper-recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, styrofoam peanuts, batteries, CRTs, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-CH, through the Laboratory's Self Assessment Report, on its Affirmative Procurement Performance Measure. A performance level of ''outstanding'' was achieved in 2005. The Laboratory underwent a voluntary Environmental Management Review (EMR) in 2003. Members of the Environmental Protection Agency (EPA) Region VII and Iowa Department of Natural Resources (IDNR) conducted the EMR in November 2003. The EMR was conducted as part of the process for developing and implementing an Environmental Management System (EMS) at the Laboratory. The final EMR report was received on June 19, 2003. Most of the recommendations were implemented to fulfill the EMS requirements for the ISO 14001:1996 standard. In 2004, the Laboratory ''Self Declared'' that it had fully integrated an EMS with its Integrated Safety Management System (ISMS) and met the requirements of Executive Order 13148. In November of 2005 DOE-CH conducted a self-declaration assessment of the Laboratory's EMS. The assessment found two nonconformities that the Laboratory promptly corrected, allowing the DOE-CH Ames Site Office to accept the Laboratory's self-declaration (See EMS Assessment letter, December 21, 2005 in Appendix D).

Dan Kayser

2005-12-31T23:59:59.000Z

260

Planning for Years to Come  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education...

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

A New Years Trip A New Years Trip  

E-Print Network (OSTI)

A New Years Trip A New Years Trip December 26, 2003 - January 3, 2004 By Saul Wilson #12;A New Years Trip 7 INTRODUCTION #12;A New Years Trip 8 rom December 26, 2003 to January 3, 2004 my dad and I

Wilson, W. Stephen

262

Calendar Year 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Office of Inspector General 
1000 3 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Audit Report: OAS-FS-14-03 http://energy.gov/ig/downloads/audit-report-oas-fs-14-03 Audit Report: OAS-FS-14-03

263

The Foundation Year Monash University  

E-Print Network (OSTI)

The Foundation Year Monash University Foundation Year Monash College has helped me to make my future better. By studying the Foundation Year, I am always learning something new and still having lots of fun. Thanks to the Foundation Year, I am preparing for a successful future. Vonny Leonardy, Monash

Albrecht, David

264

NUCLEAR ENGINEERING Four Year Plan  

E-Print Network (OSTI)

NUCLEAR ENGINEERING Four Year Plan Fall 2009 Nuclear Engineering (67 hrs) CH Grade Perspectives (15;Nuclear Engineering Four Year Plan Starting Fall 2009 FALL Year 1 Credits WINTER Year 1 Credits SPRING I NE 452 3 Neutronic Analysis II NE 457 2 Nuclear Reactor Lab Western Culture (3): NE 467 4 Nucl

Tullos, Desiree

265

CX-100118 Categorical Exclusion Determination  

Office of Energy Efficiency and Renewable Energy (EERE)

Final Rule for Amended Energy Conservation Standards for General Service Fluorescent Lamps and Incandescent Reflector Lamps RIN: 1904-AC43 CX(s) Applied: B5.1 EERE – Buildings Technology Program Date: 11/26/2014 Location(s): Nationwide Office(s): Golden Field Office

266

Residential Commercial Industrial Year  

Gasoline and Diesel Fuel Update (EIA)

4 4 Residential Commercial Industrial Year and State Volume (million cubic feet) Consumers Volume (million cubic feet) Consumers Volume (million cubic feet) Consumers 2000 Total ................... 4,996,179 59,252,728 3,182,469 5,010,817 8,142,240 220,251 2001 Total ................... 4,771,340 60,286,364 3,022,712 4,996,446 7,344,219 217,026 2002 Total ................... 4,888,816 61,107,254 3,144,169 5,064,384 7,507,180 205,915 2003 Total ................... R 5,079,351 R 61,871,450 R 3,179,493 R 5,152,177 R 7,150,396 R 205,514 2004 Total ................... 4,884,521 62,469,142 3,141,653 5,135,985 7,250,634 212,191 Alabama ...................... 43,842 806,175 26,418 65,040 169,135 2,800 Alaska.......................... 18,200 104,360 18,373 13,999 46,580 10 Arizona ........................

267

Nepal Migration Year Book 2011 Migration Year Book  

E-Print Network (OSTI)

Nepal Migration Year Book 2011 1 #12;Nepal Migration Year Book 2011 NIDS NCCR North-South #12;Book Nepal Migration Year Book 2011 Publishers Nepal Institute of Development Studies (NIDS) G.P.O. Box: 7647, Kathmandu, Nepal Email: nids@mail.com.np Web: www.nids.org.np National Centre of Competence in Research

Richner, Heinz

268

ATNI Mid-year Convention  

Energy.gov (U.S. Department of Energy (DOE))

The Affiliated Tribes of Northwest Indians Mid-year Convention will be hosted by the Chehalis Tribe.

269

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

General Service Fluorescent Lamps General Service Fluorescent Lamps Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) has regulated the energy efficiency level of general service fluorescent lamps (GSFLs) since 1994. GSFLs are fluorescent tubes with pins at one or both ends for installation. These lamps are generally installed in ceilings. Recent Updates | Standards | Test Procedures | Waiver, Exception, and Exemption Information | Statutory Authority | Historical Information | Contact Information Recent Updates DOE published a notice of public meeting and availability of preliminary technical support document regarding energy conservation standards for GSFLs. 78 FR 13563 (February 28, 2013). DOE later published a notice of correction. 78 FR 14467 (March 6, 2013). For more information, please see the rulemaking webpage.

270

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

General Service Incandescent Lamps General Service Incandescent Lamps Sign up for e-mail updates on regulations for this and other products Manufacturers have been required to comply with the Department of Energy's (DOE) energy conservation standards for general service incandescent lamps (GSILs) since 2012. Most GSILs are the pear-shaped, screw-in light bulbs found in most homes. Most GSILs are currently sold as one of four wattages: 40, 60, 75, and 100. Starting in 2012, these will be replaced by more efficient lower wattage lamps. Recent Updates | Standards | Test Procedures | Waiver, Exception, and Exemption Information | Statutory Authority | Historical Information | Contact Information Recent Updates DOE published a final rule updating the test procedures for GSILs. 77 FR 4203 (Jan. 27, 2012).

271

Updated 5/20/14 Freshman Year (32) Sophomore Year (34) Junior Year (34)  

E-Print Network (OSTI)

Updated 5/20/14 Freshman Year (32) Sophomore Year (34) Junior Year (34) Fall (15) Spring (18) Fall (17) Spring (16) Fall (18) Spring (16) Fall (16) Spring (13) CALC I (4) CALC III [4] SOLIDS (3) CALC membership recommended prerequisite corequisite Engineering-related summer job or internship recommended lab

272

Updated 3/21/13 Freshman Year (32) Sophomore Year (34) Junior Year (34)  

E-Print Network (OSTI)

Updated 3/21/13 Freshman Year (32) Sophomore Year (34) Junior Year (34) Fall (15) Spring (17) Fall (18) Spring (16) Fall (18) Spring (16) Fall (16) Spring (13) CALC I (4) CALC III [4] SOLIDS (3) CALC membership recommended prerequisite corequisite Engineering-related summer job or internship recommended lab

273

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

. Income Expenditure Assets Liabilities http://www.fin.mmu.ac.uk/f18_001b.htm06/07/2004 13:02:41 #12;5 Year Financial Profile - Charts - Income 5 Year Financial Profile Charts Income Back http://www.fin.mmu.ac.uk/f18 Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_001d.htm06/07/2004 13:02:52 #12;5 Year

274

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

. Income Expenditure Assets Liabilities http://www.fin.mmu.ac.uk/f18_0029.htm06/07/2004 13:01:23 #12;5 Year Financial Profile - Charts - Income 5 Year Financial Profile Charts Income Back http://www.fin.mmu.ac.uk/f18 Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_002d.htm06/07/2004 13:01:34 #12;5 Year

275

Fiscal Year 2012 Congressional Budget  

Office of Energy Efficiency and Renewable Energy (EERE)

The Fiscal Year 2012 Congressional Budget of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

276

One Year Passport to Success  

Energy.gov (U.S. Department of Energy (DOE))

Describes the framework for the Department's on-boarding program for a new employee from day one through their first year.

277

Fiscal Year 2011 Congressional Budget  

Office of Energy Efficiency and Renewable Energy (EERE)

The Fiscal Year 2011 Congressional Budget of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

278

Lasers: The First Fifty Years  

SciTech Connect

This year marks the 50th anniversary of the invention of the laser. The Optical Society of America is publishing this feature issue to celebrate this auspicious birthday.

Boyd, Robert W.; Athale, Ravindra; Onural, Levent; Seka, Wolf

2010-09-01T23:59:59.000Z

279

Yearly  

E-Print Network (OSTI)

In 2009, a new activity was launched under the International Energy Agency Wind Implementing Agreement (IEA Wind) for the small wind sector. The main focus of this activity, called Task 27, is to develop recommended practices for consumer labeling of existing commercial small wind turbines. Participants will also exchange information about the status of the small wind industry in the member countries. This report outlines the status of the small wind sector in 2009 in the countries participating in Task 27. (For more information about IEA Wind and the consumer label developed under Task 27, see www.ieawind.org.)

unknown authors

2009-01-01T23:59:59.000Z

280

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 10 White Female (W F) 2 DIVERSITY TOTAL WORKFORCE GENDER Associate...

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 5 Asian Male 0 Asian Female 0 Hispanic Male 0 Hispanic Female 3 White Male 9 White Female 1 Workforce Diversity Office of the Administrator (NA-1) As of...

282

YEAR  

National Nuclear Security Administration (NNSA)

American Female 2 Asian Male 2 Asian Female 0 Hispanic Male 13 Hispanic Female 17 White Male 37 White Female 17 DIVERSITY GENDER Workforce Diversity Sandia Site Office As of...

283

YEAR  

National Nuclear Security Administration (NNSA)

American Female 6 Asian Male 0 Asian Female 0 Hispanic Male 7 Hispanic Female 18 White Male 40 White Female 25 DIVERSITY GENDER Workforce Diversity As of March 24, 2012 PAY...

284

YEAR  

National Nuclear Security Administration (NNSA)

(AAPI,F) 2 2 0.00% Hispanic Male (H,M) 6 6 0.00% Hispanic Female (H,F) 6 6 0.00% White Male (W,M) 53 50 -5.66% White Female (W,F) 19 13 -31.58% Change DIVERSITY...

285

YEAR  

National Nuclear Security Administration (NNSA)

American Female 39 Asian Male 4 Asian Female 5 Hispanic Male 20 Hispanic Female 50 White Male 57 White Female 84 DIVERSITY Workforce Diversity Associate Administrator for...

286

YEAR  

National Nuclear Security Administration (NNSA)

American Female 43 Asian Male 3 Asian Female 4 Hispanic Male 21 Hispanic Female 47 White Male 61 White Female 92 DIVERSITY Workforce Diversity Associate Administrator for...

287

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 4 White Female (W F) 5 DIVERSITY TOTAL WORKFORCE GENDER Associate...

288

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 25 Hispanic Male (H M) 202 Hispanic Female (H F) 177 White Male (W M) 1244 White Female (W F) 453 Total includes 2425 permanent and 21 temporary...

289

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 1 Hispanic Male (H, M) 5 Hispanic Female (H, F) 6 White Male (W, M) 75 White Female (W, F) 32 TOTAL WORKFORCE GENDER NNSA Production Office...

290

YEAR  

National Nuclear Security Administration (NNSA)

American Female 19 Asian Male 9 Asian Female 5 Hispanic Male 18 Hispanic Female 12 White Male 101 White Female 49 DIVERSITY Workforce Diversity Immediate Office of the Deputy...

291

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 5 Hispanic Female (H F) 3 White Male (W M) 30 White Female (W F) 3 DIVERSITY TOTAL WORKFORCE GENDER Associate...

292

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 3 Hispanic Male (H M) 15 Hispanic Female (H F) 33 White Male (W M) 44 White Female (W F) 68 DIVERSITY TOTAL WORKFORCE GENDER Associate...

293

YEAR  

National Nuclear Security Administration (NNSA)

0 0 0.00% Hispanic Male (H,M) 12 12 0.00% Hispanic Female (H,F) 12 11 -8.33% White Male (W,M) 34 34 0.00% White Female (W,F) 17 16 -5.88% Change DIVERSITY Change...

294

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 5 Hispanic Female (H F) 3 White Male (W M) 26 White Female (W F) 16 DIVERSITY TOTAL WORKFORCE GENDER Livermore Field...

295

YEAR  

National Nuclear Security Administration (NNSA)

American Female 1 Asian Male 9 Asian Female 2 Hispanic Male 75 Hispanic Female 21 White Male 400 White Female 19 DIVERSITY Workforce Diversity Assistant Deputy Administrator...

296

YEAR  

National Nuclear Security Administration (NNSA)

3 2 -33.33% Hispanic Male (H,M) 5 5 0.00% Hispanic Female (H,F) 4 4 0.00% White Male (W,M) 29 26 -10.34% White Female (W,F) 19 16 -15.79% Change DIVERSITY...

297

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 4 Hispanic Female (H F) 7 White Male (W M) 13 White Female (W F) 11 DIVERSITY TOTAL WORKFORCE GENDER Office of General...

298

YEAR  

National Nuclear Security Administration (NNSA)

(AAPI,F) 1 1 0.00% Hispanic Male (H,M) 5 5 0.00% Hispanic Female (H,F) 6 6 0.00% White Male (W,M) 85 71 -16.47% White Female (W,F) 33 30 -9.09% Change DIVERSITY...

299

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 1 Asian Male 2 Asian Female 0 Hispanic Male 4 Hispanic Female 3 White Male 29 White Female 3 Workforce Diversity Associate Administrator for Safety & Health...

300

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 2 Hispanic Male (H, M) 74 Hispanic Female (H, F) 22 White Male (W, M) 393 White Female (W, F) 19 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER...

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

YEAR  

National Nuclear Security Administration (NNSA)

American Female 4 Asian Male 22 Asian Female 4 Hispanic Male 5 Hispanic Female 4 White Male 30 White Female 19 Workforce Diversity Livermore Site Office As of March 24, 2012...

302

YEAR  

National Nuclear Security Administration (NNSA)

American Female 7 Asian Male 3 Asian Female 0 Hispanic Male 23 Hispanic Female 24 White Male 36 White Female 35 DIVERSITY Workforce Diversity Associate Administrator for...

303

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 0 Hispanic Male (H, M) 12 Hispanic Female (H, F) 11 White Male (W, M) 34 White Female (W, F) 16 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER Sandia...

304

YEAR  

National Nuclear Security Administration (NNSA)

Hispanic Male (H,M) 217 207 -4.61% Hispanic Female (H,F) 196 182 -7.14% White Male (W,M) 1318 1271 -3.57% White Female (W,F) 511 463 -9.39% Total includes...

305

YEAR  

National Nuclear Security Administration (NNSA)

American Female 158 Asian Male 79 Asian Female 29 Hispanic Male 220 Hispanic Female 202 White Male 1340 White Female 519 Workforce Diversity National Nuclear Security...

306

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 13 White Female (W F) 5 DIVERSITY TOTAL WORKFORCE GENDER Savannah River...

307

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 76 Hispanic Female (H F) 21 White Male (W M) 401 White Female (W F) 20 DIVERSITY TOTAL WORKFORCE GENDER Assistant Deputy...

308

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 3 Hispanic Female (H F) 5 White Male (W M) 43 White Female (W F) 10 DIVERSITY TOTAL WORKFORCE GENDER Associate...

309

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 12 Hispanic Female (H F) 12 White Male (W M) 34 White Female (W F) 16 DIVERSITY TOTAL WORKFORCE GENDER Sandia Field...

310

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 1 Asian Male 2 Asian Female 0 Hispanic Male 5 Hispanic Female 3 White Male 29 White Female 5 DIVERSITY Workforce Diversity Associate Administrator for...

311

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 0 Hispanic Female 0 White Male 14 White Female 8 DIVERSITY GENDER Workforce Diversity Savannah River Site Office...

312

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 25 Hispanic Female (H F) 25 White Male (W M) 61 White Female (W F) 41 DIVERSITY TOTAL WORKFORCE GENDER Associate...

313

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 2 Hispanic Female (H F) 0 White Male (W M) 154 White Female (W F) 71 * Total numbers are combined. NA-30 total numbers...

314

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 2 Hispanic Female (H F) 6 White Male (W M) 10 White Female (W F) 3 DIVERSITY TOTAL WORKFORCE GENDER Associate...

315

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 0 Hispanic Male (H, M) 1 Hispanic Female (H, F) 0 White Male (W, M) 25 White Female (W, F) 6 TOTAL WORKFORCE GENDER Kansas City Field Office...

316

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 7 Hispanic Male (H M) 7 Hispanic Female (H F) 10 White Male (W M) 82 White Female (W F) 60 DIVERSITY TOTAL WORKFORCE GENDER Deputy...

317

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 5 White Female 6 DIVERSITY Workforce Diversity Associate Administrator of...

318

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 12 Hispanic Female (H F) 7 White Male (W M) 66 White Female (W F) 22 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER Deputy...

319

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 2 Asian Male 3 Asian Female 0 Hispanic Male 5 Hispanic Female 5 White Male 44 White Female 13 Workforce Diversity Pantex Site Office As of March 24, 2012...

320

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 2 Asian Male 1 Asian Female 0 Hispanic Male 0 Hispanic Female 0 White Male 8 White Female 3 DIVERSITY Workforce Diversity As of March 24, 2012 PAY PLAN...

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 2 Hispanic Male (H, M) 5 Hispanic Female (H, F) 4 White Male (W, M) 25 White Female (W, F) 17 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER...

322

YEAR  

National Nuclear Security Administration (NNSA)

2 2 0.00% Hispanic Male (H,M) 76 75 -1.32% Hispanic Female (H,F) 22 21 -4.55% White Male (W,M) 389 400 2.83% White Female (W,F) 21 19 -9.52% Change DIVERSITY...

323

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 2 Hispanic Male (H, M) 6 Hispanic Female (H, F) 6 White Male (W, M) 51 White Female (W, F) 14 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER Nevada...

324

YEAR  

National Nuclear Security Administration (NNSA)

American Female 11 Asian Male 2 Asian Female 1 Hispanic Male 3 Hispanic Female 6 White Male 50 White Female 11 DIVERSITY GENDER Workforce Diversity Associate Administrator...

325

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 6 Hispanic Female (H F) 14 White Male (W M) 39 White Female (W F) 21 DIVERSITY TOTAL WORKFORCE GENDER Associate...

326

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 4 Asian Male 2 Asian Female 3 Hispanic Male 7 Hispanic Female 5 White Male 52 White Female 20 Workforce Diversity Nevada Site Office As of March 24, 2012...

327

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 9 White Male 13 White Female 10 Workforce Diversity Office of General Counsel (NA-GC) As of...

328

YEAR  

National Nuclear Security Administration (NNSA)

American Female 6 Asian Male 0 Asian Female 0 Hispanic Male 7 Hispanic Female 18 White Male 40 White Female 28 DIVERSITY Workforce Diversity Associate Administrator for...

329

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 0 Hispanic Male (H, M) 0 Hispanic Female (H, F) 0 White Male (W, M) 15 White Female (W, F) 7 TOTAL WORKFORCE GENDER Savannah River Field...

330

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 8 Asian Male 3 Asian Female 1 Hispanic Male 1 Hispanic Female 0 White Male 76 White Female 22 DIVERSITY Workforce Diversity Deputy Administrator for Naval...

331

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 5 Asian Male 3 Asian Female 1 Hispanic Male 0 Hispanic Female 1 White Male 46 White Female 22 Workforce Diversity Y-12 Site Office As of March 24, 2012 PAY...

332

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 24 White Female (W F) 6 TOTAL WORKFORCE GENDER Kansas City Field Office As...

333

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 4 Asian Male 0 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 28 White Female 6 Workforce Diversity Kansas City Site Office As of March 24,...

334

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 8 Asian Male 1 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 11 White Female 5 DIVERSITY Workforce Diversity Associate Administrator for...

335

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 3 White Male (W M) 7 White Female (W F) 1 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER National...

336

YEAR  

National Nuclear Security Administration (NNSA)

(AAPI,F) 0 0 0.00% Hispanic Male (H,M) 1 1 0.00% Hispanic Female (H,F) 0 0 0.00% White Male (W,M) 27 25 -7.41% White Female (W,F) 6 6 0.00% Change DIVERSITY Change...

337

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 4 Hispanic Male (H M) 3 Hispanic Female (H F) 6 White Male (W M) 26 White Female (W F) 18 TOTAL WORKFORCE GENDER Associate Administrator for...

338

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 68 White Female (W F) 30 DIVERSITY TOTAL WORKFORCE GENDER NNSA Production...

339

Venice data > year = 1931:1981  

E-Print Network (OSTI)

:3,] year r1 1 1931 103 2 1932 78 3 1933 121 > attach(venice) ## > plot(year,r1) > lm(r1 ~ year) Call: lm(formula = r1 ~ year) #12;Coefficients: (Intercept) year -989.382 0.567 > lm(r1 ~ year - mean(year)) ## Error differ (found for 'mean(year)') ### > lm(r1 ~ I(year - mean(year))) Call: lm(formula = r1 ~ I(year - mean

Reid, Nancy

340

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

Charts Income Back http://www.fin.mmu.ac.uk/f18_004b.htm06/07/2004 12:57:08 #12;5 Year Financial Profile - Charts - zoom 5 Year Financial Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_004c.htm06 http://www.fin.mmu.ac.uk/f18_004d.htm06/07/2004 12:57:19 #12;5 Year Financial Profile - Charts - zoom 5

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

Charts Income Back http://www.fin.mmu.ac.uk/f18_008b.htm06/07/2004 12:51:21 #12;5 Year Financial Profile - Charts - zoom 5 Year Financial Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_008c.htm06 http://www.fin.mmu.ac.uk/f18_008d.htm06/07/2004 12:51:31 #12;5 Year Financial Profile - Charts - zoom 5

342

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

Charts Income Back http://www.fin.mmu.ac.uk/f18_010b.htm06/07/2004 10:57:23 #12;5 Year Financial Profile - Charts - zoom 5 Year Financial Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_010c.htm06 http://www.fin.mmu.ac.uk/f18_010d.htm06/07/2004 12:40:15 #12;5 Year Financial Profile - Charts - zoom 5

343

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

. Income Expenditure Assets Liabilities & Reserves http://www.fin.mmu.ac.uk/f18_0067.htm06/07/2004 13 Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_006b.htm06/07/2004 13:04:46 #12;5 Year Financial Profile - Charts - Assets 5 Year Financial Profile Charts Assets Back http://www.fin.mmu.ac.uk/f18

344

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

. Income Expenditure Assets Liabilities Income Breakdown Expenditure Breakdown http://www.fin.mmu.ac.uk/f18 Charts Income Back http://www.fin.mmu.ac.uk/f18_005b.htm06/07/2004 13:00:29 #12;5 Year Financial Profile - Charts - zoom 5 Year Financial Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_005c.htm06

345

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

. Income Expenditure Assets Liabilities & Reserves http://www.fin.mmu.ac.uk/f18_0079.htm06/07/2004 13 Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_007b.htm06/07/2004 13:05:59 #12;5 Year Financial Profile - Charts - Assets 5 Year Financial Profile Charts Assets Back http://www.fin.mmu.ac.uk/f18

346

BEFORE THE U.S. DEPARTMENT OF ENERGY Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20585 In the Matter of: ) DuraLamp USA, Inc. ) Case Number: 2010-CE-0912 (General service fluorescent lamps) ) NOTICE OF PROPOSED CIVIL PENALTY Date issued: September 9, 2010 Number of alleged violations: 5 Maximum possible assessment : $ 252,500 Proposed civil penalty: $ 36,500 The Office of the General Counsel of the U.S. Department of Energy ( DOE) alleges that DuraLamp USA, Inc. violated certain provisions of the Energy Policy and Conservation Act, 42 U.S.C. § 6201 et seq., 10 C.F.R. Part 430, or both. Specifically, DOE alleges: 1. DuraLamp USA, Inc. manufactures or privately labels a variety of general service fluorescent lamps, including models 3250, 3285, 3454, 4054, which are designated by order codes F32T8, F32T8, F34T12, F40T12, respectively. 2. These models have been in distribution in the U.S. for at least 365 days.

347

70 Images for 70 Years  

NLE Websites -- All DOE Office Websites (Extended Search)

70 Images for 70 Years 70 Images for 70 Years 70 Images for 70 Years Los Alamos has a proud history and heritage of almost 70 years of science and innovation. The people of the Laboratory work on advanced technologies to provide the best scientific and engineering solutions to many of the nation's most crucial security challenges. Click thumbnails to enlarge. Photos arranged by most recent first, horizontal formats before vertical. See Flickr for more sizes and details. 1938 Hahn and Meitner Fission 1938 Hahn and Meitner Fission 1939 Einstein-Szilard 1939 Einstein-Szilard 1940s Main Guard Gate (671938) 1940s Main Guard Gate (671938) 1940s Security check 1940s Security check 1940 Boys Ranch School hockey on Ashley Pond 1940 Boys Ranch School hockey on Ashley Pond 1942 Fuller Lodge 1942 Fuller Lodge

348

WIPP_Marks_12_Years  

NLE Websites -- All DOE Office Websites (Extended Search)

Marks 12 Years of Operations CARLSBAD, N.M., March 28, 2011 - On Saturday, March 26, 2011, the Department of Energy's Waste Isolation Pilot Plant marked another anniversary. It has...

349

Accountability report - fiscal year 1997  

SciTech Connect

This document contains the US NRC`s accountability report for fiscal year 1997. Topics include uses of funds, financial condition, program performance, management accountability, and the audited financial statement.

NONE

1998-04-01T23:59:59.000Z

350

Myths of the Year 2000  

Science Journals Connector (OSTI)

......system monitoring nuclear waste storage recommended the release of radioactive waste several years too early...and 2000. If there is long-term disruption at the end of...few days and building new storage tanks will take time......

M. Thomas

1998-01-01T23:59:59.000Z

351

Chapeau! First-Year French  

E-Print Network (OSTI)

Chapeau! is a first-year college text. Although it may appear, at first glance, o move very fast and introduce a large amount of material early, the vocabulary and grammatical structures that we expect students to control ...

Dinneen, David A.; Kernen, Madeleine

1989-01-01T23:59:59.000Z

352

NIST 3-Year Programmatic Plan  

E-Print Network (OSTI)

areas critical to the nation's economy.The America COMPETES Act outlines major roles for NIST-year period.NIST will continue to refine this plan as it works with the Administration to address national

353

World Year of Physics 2005  

NLE Websites -- All DOE Office Websites (Extended Search)

IMAGE: World Year of Physics 2005 nameplate Berkeley Lab logo Berkeley Lab Celebrates World Year of Physics 2005 Berkeley Lab Web Search Berkeley Lab Phone Book Berkeley Lab A-Z Index Berkeley Lab Privacy and Security Notice IMAGE: World Year of Physics 2005 nameplate Berkeley Lab logo Berkeley Lab Celebrates World Year of Physics 2005 Berkeley Lab Web Search Berkeley Lab Phone Book Berkeley Lab A-Z Index Berkeley Lab Privacy and Security Notice IMAGE: World of Physics graphic Symposia page link Special Events page link Lectures page link Education page link The World Year of Physics is a worldwide celebration of physics and its importance in our everyday lives. Physics not only plays an important role in the development of science and technology but also has a tremendous impact on our society. WYP aims to raise the worldwide awareness of physics and physical science. The United Nations has declared 2005 to be the International Year of Physics. This declaration coincides with the 100th anniversary of physicist

354

LNG to the year 2000  

SciTech Connect

By 2000, about 190 MM metric-tpy of LNG will be moving in world trade, with Asia-Pacific as the dominant producer By the year 2000, approximately 190 million metric tons per year of LNG will be moving in worldwide trade. Production of LNG will be spread throughout most of the world, with Asia-Pacific as the dominant producer. LNG will be delivered only to the heavily industrialized areas of North America, Europe and Asia-Pacific. The success of any LNG project will be dependent on its individual economics, market needs, financial planning, and governmental permit processes. We hope industry will be able to put together the LNG projects required to meet the quanitities of production forecast here for the year 2000.

Davenport, S.T.

1984-04-01T23:59:59.000Z

355

Policy Flash 2015-10 Announcing Award of General Services Administration Federal  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Chris Greene of the Strategic Programs Division, Office of Contract Management, at (202) 287-1719 or at Christopher.Greene@hq.doe.gov.

356

The year that never was  

Science Journals Connector (OSTI)

... of technology for bending the inclinations of their people to that simple goal, that personal liberty would cease to be, remains a nightmare ? one, nevertheless, that will not ... consistently more enlightened now than, say, a year ago, or that the suppression of liberty has by magic been banished from the face of the Earth. On the contrary, ...

1984-01-05T23:59:59.000Z

357

Telecommunications: Comsat Lives Another Year  

Science Journals Connector (OSTI)

... position which it occupies at the centre of the growing web of activity in international telecommunications by satellite. To be sure, the report does say that "the year just ... of the task force set by President Johnson to study the future pattern of domestic telecommunications, but it is hard to see how any government would be able to deny ...

1969-05-17T23:59:59.000Z

358

STUDENT AFFAIRS YEAR 1 ORIENTATION  

E-Print Network (OSTI)

STUDENT AFFAIRS YEAR 1 ORIENTATION Student Affairs Team #12;Objectives: ·Introductions ·Services Offered ·Policies ·Student Disability Services #12;Student Affairs Team: · Assistant Dean of Student/Events Guru: Allison Gherardini · Student Organizations: Tracey Eady · Glue: Benita Patrick, Jean Mc

Finley Jr., Russell L.

359

Nuclear Materials Focus Area Fiscal Year 2002 Mid Year Review  

SciTech Connect

The Nuclear Materials Focus Area (NMFA) held its annual mid-year review on February 12 and 14, 2002, in Santa Fe, New Mexico. The purpose of this review was to examine both the technical aspects and the programmatic aspects of its technology development program. The focus area activities were reviewed by a panel consisting of personnel representing the end users of the technologies, and technical experts in nuclear materials. This year's review was somewhat different than in the past, as the stress was on how well the various projects being managed through the NMFA aligned with the two thrust areas and nine key goals and priorities recently issued by the Deputy Assistant Secretary for DOE's Office of Environmental Management (EM).

Thiel, E.C.; Fuhrman, P.W.

2002-05-30T23:59:59.000Z

360

Nuclear Materials Focus Area Fiscal Year 2002 Mid Year Review  

SciTech Connect

The Nuclear Materials Focus Area (NMFA) held its annual mid-year review on February 12 and 14, 2002, in Santa Fe, New Mexico. The purpose of this review was to examine both the technical aspects and the programmatic aspects of its technology development program. The focus area activities were reviewed by a panel consisting of personnel representing the end users of the technologies, and technical experts in nuclear materials. This year's review was somewhat different than in the past, as the stress was on how well the various projects being managed through the NMFA aligned with the two thrust areas and nine key goals and priorities recently issued by the Deputy Assistant Secretary for DOE's Office of Environmental Management (EM).

Thiel, Elizabeth Chilcote

2002-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Characteristics RSE Column Factor: All Model Years Model Year  

Gasoline and Diesel Fuel Update (EIA)

or 17 Years ... 15.2 0.7 0.9 0.9 3.0 3.8 2.8 1.2 0.9 0.9 15.5 Households Without Children ... 92.2 4.2 5.9 6.5 21.8 21.8 14.2 5.9 5.5 6.4 5.5...

362

Fiscal Year 2013 Revegetation Assessment  

SciTech Connect

This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

Jenifer Nordstrom

2013-11-01T23:59:59.000Z

363

Year STB EIA STB EIA  

U.S. Energy Information Administration (EIA) Indexed Site

Release Date: November 16, 2012 Release Date: November 16, 2012 Barge Truck Total delivered cost per short ton Shipments with transportation rates over total shipments Total delivered cost per short ton Shipments with transportation rates over total shipments Year (nominal) (real) (real) (percent) (nominal) (real) (real) (percent) 2008 $6.26 $5.77 $36.50 15.8% 42.3% $6.12 $5.64 $36.36 15.5% 22.2% 2009 $6.23 $5.67 $52.71 10.8% 94.8% $4.90 $4.46 $33.18 13.5% 25.1% 2010 $6.41 $5.77 $50.83 11.4% 96.8% $6.20 $5.59 $36.26 15.4% 38.9% Annual Percent Change First to Last Year 1.2% 0.0% 18.0% - - 0.7% -0.4% -0.1% - - Latest 2 Years 2.9% 1.7% -3.6% - - 26.6% 25.2% 9.3% - - - = No data reported or value not applicable STB Data Source: The Surface Transportation Board's 900-Byte Carload Waybill Sample

364

Earth: 15 Million Years Ago  

E-Print Network (OSTI)

In Einstein's general relativity theory the metric component gxx in the direction of motion (x-direction) of the sun deviates from unity due to a tensor potential caused by the black hole existing around the center of the galaxy. Because the solar system is orbiting around the galactic center at 200 km/s, the theory shows that the Newtonian gravitational potential due to the sun is not quite radial. At the present time, the ecliptic plane is almost perpendicular to the galactic plane, consistent with this modification of the Newtonian gravitational force. The ecliptic plane is assumed to maintain this orientation in the galactic space as it orbits around the galactic center, but the rotational angular momentum of the earth around its own axis can be assumed to be conserved. The earth is between the sun and the galactic center at the summer solstice all the time. As a consequence, the rotational axis of the earth would be parallel to the axis of the orbital rotation of the earth 15 million years ago, if the solar system has been orbiting around the galactic center at 200 km/s. The present theory concludes that the earth did not have seasons 15 million years ago. Therefore, the water on the earth was accumulated near the poles as ice and the sea level was very low. Geological evidence exists that confirms this effect. The resulting global ice-melting started 15 million years ago and is ending now.

Masataka Mizushima

2008-10-13T23:59:59.000Z

365

BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 ) American Power Solutions, Inc. 1 Case Number: 201 0-CE-0911 (General service fluorescent lamps) 1 1 NOTICE OF PROPOSED CIVIL PENALTY Date issued: September 8,201 0 Number of alleged violations: 2 Maximum possible assessment: $68,600 Proposed civil penalty:. $ 14,600 The Office of the General Counsel of the U.S. Department of Energy (DOE) alleges that American Power Solutions, Inc., violated certain provisions of the Energy Policy and Conservation Act, 42 U.S.C. 9 6201 et seq., 10 C.F.R. Part 430, or both. Specifically, DOE alleges: 1. American Power Solutions, Inc. manufactures or privately labels a general service fluorescent lamp, model T8. 2. This model has been in distribution in the U.S. for at least 365 days. 3. The general service fluorescent lamp referenced in paragraph 1 is a "covered

366

Das Prfzentrum Carsten Lampe, Daniel Eggert,  

E-Print Network (OSTI)

Kalibrierlaboratorien" · Qualitätswesen analog den Anforderungen der ISO 9001 z.B. Sensorkalibriersystem / Dokumentation Prüfinstitut (durch DGWK, heute DIN CERTCO) · Seit 2003 ISO/IEC 17025 akkreditiert · Seit 2003 Prüfungen und;4 Was verlangt die Akkreditierung? ISO IEC 17025 ,,Allgemeine Anforderungen an die Kompetenz von Prüf- und

367

Max Tech and Beyond: Fluorescent Lamps  

E-Print Network (OSTI)

contain one or more rare earth elements in their chemicalcomposition. The rare earth elements are a collection of

Scholand, Michael

2012-01-01T23:59:59.000Z

368

Covered Product Category: Compact Fluorescent Lamps | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

per watt performance. Buyer Tips CFLs installed in enclosed fixtures designed for incandescent bulbs may overheat. This can significantly reduce both light output and lifetime....

369

Draft dry year tools (generation/planning)  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation > Planning > Generation Hydro Power Wind Power Monthly GSP BPA White Book Dry Year Tools Firstgov Dry Year Tools November 9, 2006 - Final Dry Year Guide: The Final Dry...

370

Year Average Transportation Cost of Coal  

Gasoline and Diesel Fuel Update (EIA)

delivered costs of coal, by year and primary transport mode Year Average Transportation Cost of Coal (Dollars per Ton) Average Delivered Cost of Coal (Dollars per Ton)...

371

Calendar Year Reports | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Calendar Year Reports Calendar Year Reports Audit, Inspection and Other Reports The majority of Office of Inspector General reports are public. Certain reports, however,...

372

Twenty Years of Tevatron Operation  

Science Journals Connector (OSTI)

The superconducting Tevatron accelerator at Fermi National Accelerator Laboratory (Fermilab) has surpassed twenty years of operation. The Tevatron is still the highest energy particle accelerator in the world and will remain so until the commissioning of the LHC in Europe later this decade. The Tevatron has operated in a Fixed Target mode accelerating a proton beam into stationary targets/detectors as well as a Colliding Beam mode continuously colliding counter rotating beams of protons and antiprotons. Upon completion the Tevatron cryogenic system became the world’s largest helium refrigeration system. In 1993 the Tevatron cryogenic system was given the designation of International Historic Mechanical Engineering Landmark by the American Society of Mechanical Engineers. The operational history experiences and statistics of the Tevatron with an emphasis on the cryogenic system is presented. Improvements upgrades and current challenges of the cryogenic system are discussed.

J. C. Theilacker

2004-01-01T23:59:59.000Z

373

Budget estimates, fiscal year 1997. Volume 12  

SciTech Connect

This report contains the fiscal year budget justification to Congress. The budget provides estimates for salaries and expenses and for the Office of the Inspector General for fiscal year 1997.

NONE

1996-03-01T23:59:59.000Z

374

Undergraduate Handbook Academic Year 2012-2013  

E-Print Network (OSTI)

Undergraduate Handbook Academic Year 2012-2013 COLLEGE OF ARTS & SCIENCES Department of Physics & Astronomy #12;The University of Tennessee, Knoxville Department of Physics and Astronomy Undergraduate Handbook Academic Year 2012-2013 Contents Introduction

Tennessee, University of

375

Calendar Year 2014 | Department of Energy  

Energy Savers (EERE)

4 Calendar Year 2014 RSS December 17, 2014 Audit Report: OAS-FS-15-05 Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit December 16, 2014 Inspection...

376

Numerus Clausus College year 2014/2015  

E-Print Network (OSTI)

Numerus Clausus College year 2014/2015 Facultyof AerospaceEngineering Due to increasing numbers of students TU Delft has introduced a Numerus Clausus for first-year students for the Aerospace Engineering

Lindken, Ralph

377

Fiscal Year 2010 Budget-in-Brief  

Office of Energy Efficiency and Renewable Energy (EERE)

Fiscal Year 2010 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy

378

Secretary Chu Celebrates NNSA's 10-Year Anniversary  

ScienceCinema (OSTI)

Department of Energy Secretary Steven Chu speaks at NNSA's 10-year anniversary celebration on April 28, 2010.

Department of Energy Secretary Steven Chu

2010-09-01T23:59:59.000Z

379

Fiscal Year 2008 Budget-in-Brief  

Office of Energy Efficiency and Renewable Energy (EERE)

Fiscal Year 2008 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy.

380

Fiscal Year 2007 Budget-in-Brief  

Office of Energy Efficiency and Renewable Energy (EERE)

Fiscal Year 2007 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy.

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Fiscal Year 2009 Budget-in-Brief  

Office of Energy Efficiency and Renewable Energy (EERE)

Fiscal Year 2009 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy.

382

OUT Success Stories: Twenty Years of Success  

DOE R&D Accomplishments (OSTI)

DOE's Office of Utility Technologies celebrates 20 years of success in renewable energy research, development, and deployment.

2000-08-00T23:59:59.000Z

383

11 Years Engineering Geology Fieldwork in  

E-Print Network (OSTI)

;14 dec 2001 11 years engineering geology in Falset - science from fieldwork - hack 2 What did we Produce ? Why did we ? #12;14 dec 2001 11 years engineering geology in Falset - science from fieldwork - hack 3 happy #12;14 dec 2001 11 years engineering geology in Falset - science from fieldwork - hack 4 Why keep

Hack, Robert

384

Foundation Year Programmes: AGuideforParents  

E-Print Network (OSTI)

Foundation Year Programmes: AGuideforParents #12;Welcometo Southampton Studying in the UK is a long exciting adventures of their life. Our foundation year courses are designed to help your son or daughter, foundation year students who meet the required criteria are guaranteed a place on an undergraduate course

Anderson, Jim

385

for the year ended 31 July 2006  

E-Print Network (OSTI)

received in advance of expenditure and the deferral of capital expenditure, which during the coming year-11 Statement of Principal Accounting Policies 12-15 Consolidated Income and Expenditure Account 16-17 Statement for the Year The University's Consolidated Income, Expenditure and Results for the year to 31 July 2006

Wirosoetisno, Djoko

386

HIGHER EDUCATION TAX BENEFITS 42011 TAX YEAR  

E-Print Network (OSTI)

HIGHER EDUCATION TAX BENEFITS 42011 TAX YEAR #12;2 The credit offsets what you pay for the first four years of higher education by reducing the amount of income tax you pay. In addition, the credit during the tax year and has not claimed the Hope Scholarship Credit and/or the American Opportunity Tax

387

PHMC Year 2000 handbook: Volume 1  

SciTech Connect

The PHMC [Project Hanford Management Contract] Year 2000 Project involves the effective cooperation and participation of the Year 2000 Project Office, FDH Project Direction, FDH Chief Information Officer, major subcontractors and DynCorp. The primary responsibilities of the Year 2000 Project Office is to develop and facilitate a Year 2000 approach, provide an awareness program, report status, and perform compliance assurance reviews. The primary responsibility of the FDH Project Directors is to direct the major subcontractors, and DynCorp toward the successful completion of Year 2000 activities.

Layfield, K.A.

1998-09-02T23:59:59.000Z

388

FTCP Annual Report- Calendar Year 2008  

Energy.gov (U.S. Department of Energy (DOE))

FTCP Annual Report summarizes the yearly actions taken to ensure organizations maintain their critical technical capabilities needed for the safe operations of defense nuclear facilities.

389

FTCP Annual Report- Calendar Year 2007  

Energy.gov (U.S. Department of Energy (DOE))

Report summarizes the yearly actions taken to ensure organizations maintain their critical technical capabilities needed for the safe operations of defense nuclear facilities.

390

,"Year",,"Summer",,,"Eastern Power Grid",,,,,,,,,,,,,,,,,,,,...  

U.S. Energy Information Administration (EIA) Indexed Site

Region, 1990 through 2004 " ,"(Megawatts and Percent)" ,"Year",,"Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

391

Classification CommuniQué- Year: 2013  

Energy.gov (U.S. Department of Energy (DOE))

Classification newsletters for the year 2013, consisting of the following issues: CommuniQué 2013-1 - Spring 2013 CommuniQué 2013-2 - Fall 2013

392

Ten Years of Public Acceptance in Transports  

SciTech Connect

This paper discusses ten years of public acceptance experience in transports for Europe and coastal states between France and Japan and examples of Central and South America.

Guais, J.C.; Neau, H.J.

2004-10-03T23:59:59.000Z

393

NREL Technology Partnerships: Fiscal Year 2014  

NLE Websites -- All DOE Office Websites (Extended Search)

in duration. NREL TECHNOLOGY PARTNERSHIPS: FISCAL YEAR 2014 The National Renewable Energy Laboratory (NREL) works with hundreds of partners within industry, government,...

394

Fiscal Year 2013 Budget Request Briefing  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

- Courtesy of Enel Green Power - North America Fiscal Year 2013 Budget Request Briefing March 13, 2012 Change photo Glass Buttes, OR (DOE) Energy Efficiency & Renewable Energy...

395

PHMC Year 2000: Status reporting for mission essential Year 2000 projects. Volume 3  

SciTech Connect

The PHMC (Project Hanford Management Contract) Year 2000 status reporting process is designed to encompass the reporting requirements of the Office of Management and Budget (OMB), DOE HQ, RL and the PHMC team for mission essential Year 2000 projects. Status reporting is required for all mission essential Year 2000 projects until each Year 2000 project has completed the compliance assurance process.

Layfield, K.A.

1998-09-02T23:59:59.000Z

396

New Energy Efficiency Standards to Help Americans Save Money by Saving Energy, Cut Carbon Pollution  

Office of Energy Efficiency and Renewable Energy (EERE)

In support of the President’s Climate Action Plan, the Energy Department announced two new energy efficiency standards today. The new standards for general service fluorescent lamps (GSFLs) and automatic commercial ice makers (ACIMs) are the ninth and tenth standards to be finalized in 2014.

397

100 years of history Queen's University Belfast  

E-Print Network (OSTI)

100 years of history Queen's University Belfast School of Mechanical & Aerospace Engineering Centenary 1912 - 2012 This site celebrates 100 years of electrical and mechanical engineering degrees in engineering and in engineering education. Prior to 1912 When the Queen's College Belfast was established

Martin, Ralph R.

398

Journal of Melittology: First year ‘abuzz’  

E-Print Network (OSTI)

State University, 100 Campus Drive, Weatherford, Oklahoma 73096, USA (victorgonzab@gmail.com). This year, on the 11th of January, we celebrated the first anniversary of the Journal of Melittology (JoM). What many years earlier started as a dream...

Engel, Michael S.; Gonzalez, Victor H.; Michener, Charles D.

2014-01-18T23:59:59.000Z

399

HIGHER EDUCATION TAX 42013 TAX YEAR  

E-Print Network (OSTI)

HIGHER EDUCATION TAX BENEFITS 42013 TAX YEAR #12;2 The credit offsets what you pay for the first four years of higher education by reducing the amount of income tax you pay. In addition, the credit is more than you owe in taxes. Eligibility Requirements The full credit is available to individuals whose

Reif, John H.

400

BIO-OPTICAL PRESENTATIONS YEARS 2000 2004  

E-Print Network (OSTI)

BIO-OPTICAL PRESENTATIONS YEARS 2000 ­ 2004 YEAR 00-01 Armstrong, R.A., F. Gilbes, R. Guerrero. Lopez, and F. Gilbes, 2000, "Apparent Optical Properties at the Caribbean Time Station", Ocean Optics XV, Monaco. Gilbes, F., and R.A. Armstrong, 2000, "Inherent Optical Properties at the Caribbean Time Series

Gilbes, Fernando

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

1999 Commercial Buildings Characteristics--Year Constructed  

U.S. Energy Information Administration (EIA) Indexed Site

Year Constructed Year Constructed Year Constructed More than one-third (37 percent) of the floorspace in commercial buildings was constructed since 1980 and more than one-half (55 percent) after 1969 (Figure 1). Less than one-third of floorspace was constructed before 1960. Detailed tables Figure 1. Distribution of Floorspace by Year Constructed, 1999 Figure 1. Distribution of Floorspace by Year Constructed, 1999. If having trouble viewing this page, please contact the National Energy Information Center at (202) 586-8800. Energy Information Administration Commercial Buildings Energy Consumption Survey Overall, relatively more buildings than floorspace were represented in the older age categories and more floorspace than buildings in the newer categories (see graphical comparison) because older buildings were smaller than more recently constructed buildings (Figure 2). Buildings constructed prior to 1960 were 11,700 square feet in size on average while those constructed after 1959 were 37 percent larger at 16,000 square feet per building.

402

Facility Representative of the Year Award  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPRESENTATIVE OF THE YEAR AWARD PROGRAM REPRESENTATIVE OF THE YEAR AWARD PROGRAM OBJECTIVE The Facility Representative Award Program is a special award designed to recognize superior or exemplary service by a Facility Representative over a period of one year. This special award program has been established in accordance with the requirements of Department of Energy (DOE) Order 331.1C, Employee Performance Management and Recognition Program. FACILITY REPRESENTATIVE OF THE YEAR AWARD The Facility Representative of the Year Award is determined by a panel representing the Chief Health, Safety and Security Officer and managers from the National Nuclear Security Administration (NNSA), the Office of Environmental Management (EM), the Office of Science (SC), and the Office of Nuclear Energy (NE). The Facility Representative Program Manager in

403

New Years Revolutions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Years Revolutions New Years Revolutions New Years Revolutions January 3, 2012 - 9:42am Addthis Drew Bittner Web Manager, Office of Energy Efficiency and Renewable Energy Happy New Year to all you Energy Savers out there! Now that 2012 calendars are up and we (hopefully) remember to use '12 instead of '11 where necessary (does anyone write checks anymore?), it's time to think about the New Year's resolutions we made and are (hopefully again) still keeping. For instance... if you've been putting off getting an energy assessment of your home, why wait? Now is a good time to find out if you have cracks, leaks or other places where heat is escaping; you can start making your home more energy efficient today. Have you put off replacing your traditional light bulbs with energy efficient ones? Well, check out our page on lighting and get started! There

404

New Years Revolutions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Years Revolutions Years Revolutions New Years Revolutions January 3, 2012 - 9:42am Addthis Drew Bittner Web Manager, Office of Energy Efficiency and Renewable Energy Happy New Year to all you Energy Savers out there! Now that 2012 calendars are up and we (hopefully) remember to use '12 instead of '11 where necessary (does anyone write checks anymore?), it's time to think about the New Year's resolutions we made and are (hopefully again) still keeping. For instance... if you've been putting off getting an energy assessment of your home, why wait? Now is a good time to find out if you have cracks, leaks or other places where heat is escaping; you can start making your home more energy efficient today. Have you put off replacing your traditional light bulbs with energy efficient ones? Well, check out our page on lighting and get started! There

405

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development activities for the electric transmission and distribution system. OE has prepared this program plan pursuant to the requirements of Section 925 of the Energy Policy Act of 2005 (EPACT), as outlined below. This plan delineates research directions and priorities. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs.

406

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development activities for the electric transmission and distribution system. OE has prepared this program plan pursuant to the requirements of Section 925 of the Energy Policy Act of 2005 (EPACT), as outlined below. This plan delineates research directions and priorities. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs.

407

Happy New Year! | OpenEI Community  

Open Energy Info (EERE)

Happy New Year! Happy New Year! Home > Groups > Geothermal Regulatory Roadmap Kyoung's picture Submitted by Kyoung(155) Contributor 7 January, 2013 - 10:09 analysis BHFS Colorado interface Legal review Texas As we welcome the new year, we are finishing up edits to the roadmap following input from our legal team at [www.bhfs.com BHFS] and are starting to develop mock-ups for the new and improved GRR web interface. We are thrilled to have had so much feedback and input from all of you this past year on what can be done to improve the usability of this tool, and will continue to solicit input and feedback from you as development progresses. We have narrowed our focus of adding additional states for FY13 to include Colorado and Texas. This will allow us more time to focus on some of the

408

Fiscal Year 2010 Budget-in-Brief  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency and Renewable Energy Fiscal Year 2010 Budget-in-Brief www.eere.energy.gov Table of Contents Table of Contents...................................................................................................................................... 2 Preface ...................................................................................................................................................... 3 Highlights: ................................................................................................................................................ 5 Program Priorities..................................................................................................................................... 6 Key Accomplishments..............................................................................................................................

409

Lab celebrates 50 years in space  

NLE Websites -- All DOE Office Websites (Extended Search)

celebrates 50 years in space celebrates 50 years in space Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Lab celebrates 50 years in space National security missions and pure research December 1, 2013 Lab celebrates 50 years in space Lab's instruments have helped detect possible nuclear weapon detonations and led to fundamental scientific discoveries. Contacts Community Programs Office Director Kurt Steinhaus Email Editor Linda Anderman Email Not only does 2013 mark the Lab's 70th anniversary, it also marks the 50th anniversary of its first mission into space. During those five decades, it's been involved in 206 launches-only a few other organizations in the world can claim more-that began with the goal of helping monitor compliance with the 1963 Partial Test Ban Treaty through

410

1st Year Orientation Farid N. Najm  

E-Print Network (OSTI)

mobile, internet, sensors, HCI, energy, biology, medicine ... § Engineering can change the world § You and Program Advising � Counselling and Referrals § Contact: � Jennifer Fabro, First Year Counsellor � Curtis

Prodiæ, Aleksandar

411

Calendar Year 2013 | Department of Energy  

Office of Environmental Management (EM)

OAS-FS-14-03 Department of Energy's Fiscal Year 2013 Consolidated Financial Statements December 6, 2013 Special Report: IG-0900 Department of Energy's July 2013 Cyber Security...

412

Cognitive Neuropsychology twenty years on Alfonso Caramazza  

E-Print Network (OSTI)

Cognitive Neuropsychology twenty years on Alfonso Caramazza Cognitive Neuropsychology Laboratory, Harvard University, Cambridge, MA, USA Max Coltheart Macquarie Centre for Cognitive Science, Macquarie University, Sydney, NSW, Australia Cognitive neuropsychology began in the second half of the nineteenth

Caramazza, Alfonso

413

DOE Challenge Home Program Happy New Year!  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of the future. Please join the movement. Best, Sam Rashkin Tech training right at your desk Start the year right with a series of DOE Challenge Home Tech Training Webinars in the...

414

Residential Refrigerator Recycling Ninth Year Retention Study  

E-Print Network (OSTI)

Residential Refrigerator Recycling Ninth Year Retention Study Study ID Nos. 546B, 563 Prepared RECYCLING PROGRAMS Study ID Nos. 546B and 563 Prepared for Southern California Edison Rosemead, California

415

By Christopher Parker Class year? Hometown?  

E-Print Network (OSTI)

By Christopher Parker Class year? Hometown? - I'm class of 2010, Chemical Engineering major the opening for a tournament assistant. I'm al- ways in Keith or Jessica's office being the treasurer

416

Calendar Year 1997 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statements April 23, 1997 Audit Report: WR-FS-97-03 Report on Matters Identified at the Rocky Flats Field Office During the Audit of the Department's Consolidated Fiscal Year...

417

Ten Year Site Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ten Year Ten Year Site Plans Ten Year Site Plans A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the Department of Energy's overall strategic plan. It is a comprehensive site-wide plan encompassing the needs of tenant activities. The TYSP is integral to and supports the Department's Planning, Programming, Budgeting, and Evaluation System (PPBES). The TYSP also describes site-specific actions the programs plans in order to meet stewardship, recapitalization and sustainability goals for their facilities. The Department requires all programs to update their TYSPs at least annually and submitted either concurrently with responses to the field budget call, or as directed to be consistent with the PPBES cycle.

418

Nuclear waste bill dead for this year  

Science Journals Connector (OSTI)

Nuclear waste bill dead for this year ... "Politics pure and simple" killed compromise legislation to create an interim storage facility in Nevada for commercial high-level nuclear waste, say bill proponents in Congress and in the nuclear power industry. ... Last year, bills passed both the House and Senate that would have required the government to, among other things, temporarily store nuclear waste until a permanent facility could be built. ...

JEFF JOHNSON

1998-06-08T23:59:59.000Z

419

architecture 2-year master of architecture option deadlinesmaster of architecture 3-year master of architecture option  

E-Print Network (OSTI)

credits) 1 environmental technology course (3 credits) 2 architectural history courses (6 credits) 3master of architecture (M.Arch.) #12;2-year master of architecture option deadlinesmaster of architecture 3-year master of architecture option Taubman College's 2-year master of architecture option

Papalambros, Panos

420

EXC-13-0001 - In the Matter of Feit Electric Company, Inc. | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 - In the Matter of Feit Electric Company, Inc. 1 - In the Matter of Feit Electric Company, Inc. EXC-13-0001 - In the Matter of Feit Electric Company, Inc. On February 5, 2013, OHA issued a decision granting an Application for Exception filed by Feit Electric Company (Feit) for relief from the provisions of 10 C.F.R. Part 430, Energy Conservation Program: Energy Conservation Standards and Test Procedures for General Service Fluorescent Lamps and Incandescent Reflector Lamps (Lighting Efficiency Standards). In its exception request, Feit asserted that it will suffer a serious hardship, gross inequity and an unfair distribution of burdens if required to adhere to the new Lighting Efficiency Standards, effective July 14, 2012 (2009 Final Rule), with respect to its 700 series T8 General Service Fluorescent Lamps (GSFL). Specifically, Feit cited a previous OHA

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

EXC-12-0014 - In the Matter of Topaz Lighting Corporation | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 - In the Matter of Topaz Lighting Corporation 4 - In the Matter of Topaz Lighting Corporation EXC-12-0014 - In the Matter of Topaz Lighting Corporation On November 16, 2012, OHA issued a decision granting an Application for Exception filed by Topaz Lighting Corporation (Topaz) for relief from the provisions of 10 C.F.R. Part 430, Energy Conservation Program: Energy Conservation Standards and Test Procedures for General Service Fluorescent Lamps and Incandescent Reflector Lamps (Lighting Efficiency Standards). In its exception request, Topaz asserted that it will suffer a serious hardship, gross inequity and an unfair distribution of burdens if required to adhere to the new Lighting Efficiency Standards, effective July 14, 2012 (2009 Final Rule), with respect to its 700 series T8 General Service Fluorescent Lamps (GSFL). Specifically, Topaz cited a previous OHA

422

EXC-13-0003 - In the Matter of W.W. Grainger, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 - In the Matter of W.W. Grainger, Inc. 3 - In the Matter of W.W. Grainger, Inc. EXC-13-0003 - In the Matter of W.W. Grainger, Inc. On March 18, 2013, OHA issued a decision denying an Application for Exception filed by W. W. Grainger, Inc. (Grainger) for relief from the provisions of 10 C.F.R. Part 430, Energy Conservation Program: Energy Conservation Standards and Test Procedures for General Service Fluorescent Lamps and Incandescent Reflector Lamps (Lighting Efficiency Standards). In its exception request, Grainger asserted that it will suffer a serious hardship, gross inequity and an unfair distribution of burdens if required to adhere to the new Lighting Efficiency Standards, effective July 14, 2012 (2009 Final Rule), with respect to its LumaPro brand 700 series T8 General Service Fluorescent Lamps (GSFL). Specifically, Grainger cited a previous

423

BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Satco Products, Inc. Satco Products, Inc. (general service fluorescent lamps, medium base compact fluorescent lamps) ) ) ) ) ) ) ) Case Number: 2013-CE-2702 AMENDED NOTICE OF PROPOSED CIVIL PENALTY Date issued: January 30, 2013 Number of alleged violations: Maximum possible assessment: Proposed civil penalty: 2,920 (8 basic models; 36S days) $584,000 $58,400 The U.S. Department of Energy ("DOE") Office of the General Counsel, Office of Enforcement, alleges that Satco Products, Inc. ("Satco") has violated ce1iain provisions of the Energy Policy and Conservation Act, 42 U.S.C. § 6291 et seq. ("the Act"), and JO C.F.R. § 429.12. Specifically, DOE alleges: 1. Satco has manufactured 1 a variety of general service fluorescent lamps, including basic

424

EXC-12-0011 - In the Matter of Westinghouse Lighting Corporation |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 - In the Matter of Westinghouse Lighting Corporation 1 - In the Matter of Westinghouse Lighting Corporation EXC-12-0011 - In the Matter of Westinghouse Lighting Corporation On September 17, 2012, OHA issued a decision granting an Application for Exception filed by Westinghouse Lighting Corporation (Westinghouse) for relief from the provisions of 10 C.F.R. Part 430, Energy Conservation Program: Energy Conservation Standards and Test Procedures for General Service Fluorescent Lamps and Incandescent Reflector Lamps (Lighting Efficiency Standards). In its exception request, Westinghouse asserted that it will suffer a serious hardship, gross inequity and an unfair distribution of burdens if required to adhere to the Lighting Efficiency Standards, which became effective July 14, 2012 (2009 Final Rule), with respect to its 700 series T8 General Service Fluorescent Lamps (GSFL).

425

Glossary | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

General Lighting General Lighting Lighting that provides a substantially uniform level of illumination throughout an area. General lighting shall not include decorative lighting or lighting that provides a dissimilar level of illumination to serve a specialized application or feature within an area. General Service Lamp A class of incandescent lamps that provide light in virtually all directions. General service lamps are typically characterized by bulb shapes such as A, standard; S, straight side; F, flame; G, globe; and PS, pear straight. Generally Accepted Engineering Standard A specification, rule, guide, or procedure in the field of engineering, or related thereto, recognized and accepted as authoritative. Glazed Wall System A category of site-assembled fenestration products, which includes, but is

426

EXC-12-0009 - In the Matter of Satco Products, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 - In the Matter of Satco Products, Inc. 9 - In the Matter of Satco Products, Inc. EXC-12-0009 - In the Matter of Satco Products, Inc. On July 20, 2012, OHA issued a decision granting an Application for Exception filed by Satco Products, Inc. (Satco) for relief from the provisions of 10 C.F.R. Part 430, Energy Conservation Program: Energy Conservation Standards and Test Procedures for General Service Fluorescent Lamps and Incandescent Reflector Lamps (Lighting Efficiency Standards). In its exception request, Satco asserted that it will suffer a serious hardship, gross inequity and an unfair distribution of burdens if required to adhere to the new Lighting Efficiency Standards, effective July 14, 2012 (2009 Final Rule), with respect to its 700 series T8 General Service Fluorescent Lamps (GSFL). Specifically, Satco cited a previous OHA

427

EXC-12-0013 - In the Matter of EiKO, Ltd. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 - In the Matter of EiKO, Ltd. 3 - In the Matter of EiKO, Ltd. EXC-12-0013 - In the Matter of EiKO, Ltd. On November 16, 2012, OHA issued a decision granting an Application for Exception filed by EiKO, Ltd. (EiKO) for relief from the provisions of 10 C.F.R. Part 430, Energy Conservation Program: Energy Conservation Standards and Test Procedures for General Service Fluorescent Lamps and Incandescent Reflector Lamps (Lighting Efficiency Standards). In its exception request, EiKO asserted that it will suffer a serious hardship, gross inequity and an unfair distribution of burdens if required to adhere to the new Lighting Efficiency Standards, effective July 14, 2012 (2009 Final Rule), with respect to its 700 series T8 General Service Fluorescent Lamps (GSFL). Specifically, EiKO cited a previous OHA decision in which OHA granted

428

EXC-12-0005 - In the Matter of Halco Lighting Technologies | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 - In the Matter of Halco Lighting Technologies 5 - In the Matter of Halco Lighting Technologies EXC-12-0005 - In the Matter of Halco Lighting Technologies On July 10, 2012, OHA issued a decision granting an Application for Exception filed by Halco Lighting Technologies (Halco) for relief from the provisions of 10 C.F.R. Part 430, Energy Conservation Program: Energy Conservation Standards and Test Procedures for General Service Fluorescent Lamps and Incandescent Reflector Lamps (Lighting Efficiency Standards). In its exception request, Halco asserted that it will suffer a serious hardship, gross inequity and an unfair distribution of burdens if required to adhere to the new Lighting Efficiency Standards, effective July 14, 2012 (2009 Final Rule), with respect to its 700 series T8 General Service Fluorescent Lamps (GSFL). Specifically, Halco cited previous requests for

429

EXC-12-0004 - In the Matter of Ushio America, Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 - In the Matter of Ushio America, Inc 4 - In the Matter of Ushio America, Inc EXC-12-0004 - In the Matter of Ushio America, Inc On June 21, 2012, OHA issued a decision granting an Application for Exception filed by Ushio America, Inc. (Ushio) for relief from the provisions of 10 C.F.R. Part 430, Energy Conservation Program: Energy Conservation Standards and Test Procedures for General Service Fluorescent Lamps and Incandescent Reflector Lamps (Lighting Efficiency Standards). In its exception request, Ushio asserted that it will suffer a serious hardship, gross inequity and an unfair distribution of burdens if required to adhere to the new Lighting Efficiency Standards, effective July 14, 2012 (2009 Final Rule), with respect to its 700 series T8 General Service Fluorescent Lamps (GSFL). Specifically, Ushio cited previous requests for

430

Multi-Year Research, Development, and Demonstration Plan | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Multi-Year Research, Development, and Demonstration Plan Multi-Year Research, Development, and Demonstration Plan The cover of the Geothermal Multi-Year Research, Development and...

431

State Energy Program Formula Grant Guidance Program Year 2007...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Formula Grant Guidance Program Year 2007 State Energy Program Formula Grant Guidance Program Year 2007 This document provides instructions to the states for program year 2007 about...

432

ALS History: The First 20 Years  

NLE Websites -- All DOE Office Websites (Extended Search)

History: The First 20 Years Print History: The First 20 Years Print Below is an interactive timeline covering highlights of the first 20 years of ALS history. By no means exhaustive, it is meant to provide a broad overview of the people and events that have helped shape the ALS as well as a sense of the breadth of the science that has been done here. Click on items to see more detail. Slide the blue rectangle at bottom to move forward or backward in time. Color Key: Science Highlights (green); People and Events (orange); Concurrent Events (blue); Facility Facts (purple) Tiki-Toki ALS Timeline: Science, People, and Events About this timeline This timeline shows the history of the Advanced Light Source. Slide the blue rectangle at bottom to move forward or backward in time.;xNLx;;xNLx;Color Key:;xNLx;;xNLx;Green = Science

433

ALS History: The First 20 Years  

NLE Websites -- All DOE Office Websites (Extended Search)

History: The First 20 Years Print History: The First 20 Years Print Below is an interactive timeline covering highlights of the first 20 years of ALS history. By no means exhaustive, it is meant to provide a broad overview of the people and events that have helped shape the ALS as well as a sense of the breadth of the science that has been done here. Click on items to see more detail. Slide the blue rectangle at bottom to move forward or backward in time. Color Key: Science Highlights (green); People and Events (orange); Concurrent Events (blue); Facility Facts (purple) Tiki-Toki ALS Timeline: Science, People, and Events About this timeline This timeline shows the history of the Advanced Light Source. Slide the blue rectangle at bottom to move forward or backward in time.;xNLx;;xNLx;Color Key:;xNLx;;xNLx;Green = Science

434

Property:StartYear | Open Energy Information  

Open Energy Info (EERE)

StartYear StartYear Jump to: navigation, search This is a property of type Date. The allowed values for this property are: 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991 1990 1989 1988 1987 1986 1985 1984 1983 1982 1981 Subproperties This property has the following 1 subproperty: M Morocco-NREL Energy Activities Pages using the property "StartYear" Showing 25 pages using this property. (previous 25) (next 25) A ASEAN-GIZ Regional Environmentally Sustainable Cities Programme - RESCP + 2007 + Afghanistan-NREL Mission + 2009 + Africa - CCS capacity building + 2010 + Algeria-DLR Resource Assessments + 2007 + Asia Pacific Partnership on Clean Development and Climate + 2006 + B Bangladesh-DLR Resource Assessments + 2001 + Bangladesh-GTZ Renewable Energy and Energy Efficiency Programme + 2007 +

435

EJ first year report.cdr  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Justice Five-Year Implementation Plan First Annual Progress Report ENERGY U.S. DEPARTMENT OF 1 Melinda Downing Environmental Justice Program Manager Foreword The Department of Energy's (DOE) (Plan) sets an ambitious Departmental agenda that will guide our environmental justice (EJ) activities for five years. It sets forth an aggressive agenda, and is required to do so if we are to meet the demands that are spelled out in Presidential Executive Order 12898 and the Department's (Strategy). This is the first plan of this nature that the Department has developed. All programs, offices and activities have contributed to the work efforts to insure that we meet the Department's EJ goals and aspirations during the Plan years and beyond. When the Deputy Secretary of Energy released the DOE at the second annual The State of Environmental Justice in America 2008 Conference

436

Lab completes record year for environmental cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

Record year for environmental cleanup Record year for environmental cleanup Lab completes record year for environmental cleanup Personnel conducted more field investigations and cleanup campaigns than ever and completed a record number of Lab shipments to WIPP. December 16, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

437

This Year's MEISPP Interns | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This Year's MEISPP Interns This Year's MEISPP Interns This Year's MEISPP Interns August 12, 2010 - 5:56pm Addthis Bill Valdez Bill Valdez Principal Deputy Director One of the key programs of the Department of Energy's Office of Economic Impact and Diversity is our Minority Educational Institution Student Partnership Program (MEISPP). The MEISPP has become a major recruitment program for DOE managers who are committed to building the highest quality workforce at the Department. Students have unique experiences during their 10 weeks at DOE and perform substantive professional and technical work that furthers the Department's missions in energy, environment, national security and scientific discovery. Beyond having the opportunity to add to the mission of DOE, MEISPP interns receive a stipend along with paid

438

Purdue University Department of Forestry and Natural Resources1159 Forestry Bldg. West Lafayette, IN 47907 General Services Administration  

E-Print Network (OSTI)

machining. Furthermore, the simple- joint systems used allow the load heads to follow the complex motions of the various parts of the furniture and re-index into the proper position at #12;2 the end of each load cycle equipment. 1.0 Overview of the Test the Method The upholstered sofa is subjected to a set of loads

439

EIA-Annual Energy Outlook 2009 -Year-by-Year Reference Case Tables  

Gasoline and Diesel Fuel Update (EIA)

Reference Case Tables (2006-2030) Reference Case Tables (2006-2030) Annual Energy Outlook 2009 with Projections to 2030 Year-by-Year Reference Case Tables (2006-2030) Table Title Formats Summary Reference Case Tables PDF GIF Year-by-Year Reference Case Tables Year-by-Year Reference Case Tables. Need help, contact the National Energy Information Center at 202-586-8800. Table 1. Total Energy Supply and Disposition Summary XLS GIF Table 2. Energy Consumption by Sector and Source XLS GIF Table 3. Energy Prices by Sector and Source XLS GIF Table 4. Residential Sector Key Indicators and Consumption XLS GIF Table 5. Commercial Sector Indicators and Consumption XLS GIF Table 6. Industrial Sector Key Indicators and Consumption XLS GIF Table 7. Transportation Sector Key Indicators and Delivered Energy Consumption

440

Buildings Energy Data Book: 7.6 Efficiency Standards for Lighting  

Buildings Energy Data Book (EERE)

4 4 Lighting Standards for General Service Incandescent Lamps Prescribed by EISA 2007 General Service Incandescent Effective Date Maximum Wattage Rated Lumen Range Minimum Life Modified Spectrum General Service Incandescent Effective Date Maximum Wattage Rated Lumen Range Minimum Life By 2020, the minimum efficacy for general service incandescent will be 45 lm/W unless the Secretary of Energy has implemented another standard which saves as much or more energy than a 45 lm/W standard. Source(s): U. S. Government, Energy Independence and Security Act of 2007, January 2007, Section 321. 2014 43 563-787 1000 hrs. 2015 29 232-563 1000 hrs. 2012 72 1,118-1,950 1000 hrs. 2013 53 788-1,117 1000 hrs. 2014 43 750-1,049 1000 hrs. 2015 29 310-749 1000 hrs. 2012 72 1,490-2,600 1000 hrs. 2013 53 1,050-1,498

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Fiscal Year 2008 Budget-in-Brief  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency and Renewable Energy Fiscal Year 2008 Budget-in-Brief www.eere.energy.gov TABLE OF CONTENTS Page Preface...................................................................................................................................................... 3 Biomass and Biorefinery Systems R&D Program.................................................................................. 6 Building Technologies Program ............................................................................................................. 9 Federal Energy Management Program ................................................................................................ 13 Geothermal Technology Program.........................................................................................................

442

Classification CommuniQué- Year: 2012  

Energy.gov (U.S. Department of Energy (DOE))

Classification newsletters for the year 2012 consisting of the following issues: CommuniQué 2012-1 - March/April 2012 CommuniQué 2012-2 - September/October 2012 CommuniQué 2012-2 - September/October 2012 - Crossword Puzzle Solution

443

Published: 3 January 2013 Egypt's New Year  

E-Print Network (OSTI)

1 Published: 3 January 2013 Egypt's New Year Resolution Op-Ed by Ahmed H. Zewail CAIRO -- Egypt, is one of Egypt's largest extremist organizations. "Only when he changes his mind from being a Gamaa Brother to a national leader can we have real progress in Egypt," Mostafa said, adding: "For now

Zewail, Ahmed

444

10 years of the Cluster mission  

Science Journals Connector (OSTI)

......reaches a critical point; the flux is then...rocket carrying the four Cluster spacecraft exploded soon after lift off from Kourou...spacecraft and, just four years later on...provide an important point of entry for solar...provide the necessary four point measurements to......

Andrew P Walsh; C Forsyth; A N Fazakerley; C H K Chen; E A Lucek; J A Davies; C H Perry; S N Walker; M A Balikhin

2010-10-01T23:59:59.000Z

445

First strike Sixty years ago, Albert Einstein  

E-Print Network (OSTI)

-weapon state in association or alliance with a nuclear-weapon state." The loopholes in this policy are largeFirst strike Sixty years ago, Albert Einstein said that the existence of nuclear weapons would physicists, including Einstein, have argued that the first use of nuclear weapons can never again

Rhoads, James

446

Energy markets Academic year 2014-2015  

E-Print Network (OSTI)

). Sells electrical energy through competition in wholesale market. Could compete also to sell ancillary in fully deregulated environment). Retailer: buys electrical energy on wholesale markets. ResellsEnergy markets Academic year 2014-2015 Damien Ernst ­ University of Li`ege Email: dernst

Ernst, Damien

447

SUSTAINABLE A four-year progress report  

E-Print Network (OSTI)

TOWARD A MORE SUSTAINABLE AND JUST WORLD 2014 A four-year progress report on Seattle University's Sustainability Initiatives A Jesuit university is called to ground its teaching, research and service in social University's philosophy of sustainability is represented in our Climate Action Plan (CAP). Launched in 2010

Carter, John

448

www.nasa.gov Fiscal Year  

E-Print Network (OSTI)

www.nasa.gov Fiscal Year PERFORMANCE AND ACCOUNTABILITY REPORT 2010 National Aeronautics and Space Administration #12;NASA's Performance and Accountability Report The National Aeronautics and Space Administration (NASA) produces an annual Performance and Accountability Report (PAR) to share the Agency's progress

449

Profiling 1366 Technologies: One Year Later  

SciTech Connect

Last January, we took a look at how ARPA-E performer, 1366 Technologies is working to dramatically reduce the cost of solar energy. A year later, we revisited their headquarters in Lexington, MA to see the progress they've made.

Van Mierlo, Frank; Sachs, Ely

2011-01-01T23:59:59.000Z

450

Fiscal Year 2010 Greenhouse Gas Inventory  

E-Print Network (OSTI)

Fiscal Year 2010 Greenhouse Gas Inventory OREGON STATE UNIVERSITY #12;OREGON STATE UNIVERSITYGHG UNIVERSITYGHG Report - FY10 3 Acknowledgments Due to the broad scope of this inventory, a large number of people Oil: Amber Sams · Enterprise Rent-A-Car: Davion Reese · First Student: Brian Maxwell · Good Company

Escher, Christine

451

Fiscal Year 2009 Greenhouse Gas Inventory  

E-Print Network (OSTI)

Fiscal Year 2009 Greenhouse Gas Inventory Oregon State University Greg Smith Sustainability Program #12;Acknowledgments Due to the broad scope of this inventory, a large number of people from many - First Student: Brian Maxwell - Carson Oil: Gena Conner Government Organizations - Baker County: Jason

Escher, Christine

452

Annual Site Environmental Report. Calendar Year 1997  

SciTech Connect

This report summarizes the environmental status of Ames Laboratory for calendar year 1997. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring programs.

NONE

1997-12-01T23:59:59.000Z

453

CIOSS Five Year Review 5. Technology Transfer  

E-Print Network (OSTI)

SST fields will be documented in a peer-reviewed paper, as will the wind climatologies of CheltonCIOSS Five Year Review 5. Technology Transfer 10-11-06 A. How are research results from and the nature of the collaboration. As an example, the collaboration between Richard Reynolds and Dudley Chelton

Kurapov, Alexander

454

UIC Honors College This year represents the  

E-Print Network (OSTI)

. They are due February 15th. For all the important in- formation, check out the Ball website: http:// uichcab. The sessions cover the process of searching for internal and external awards, highlight upcoming deadlines scholarships (some are in preparation for applying next year). Please visit the OSSP website for more

Ben-Arie, Jezekiel

455

Cloud Microphysics Spring 2013 **odd years?**  

E-Print Network (OSTI)

ATS724 Cloud Microphysics (2-0-0) Spring 2013 **odd years?** Prerequisites: ATS620, ATS621; Ph, as the class will involve designing and building a simple cloud microphysical model. Course Description: **Sue and observations of nucleation, mechanisms of cloud droplet-spectra broadening, precipitation particle growth

456

100 years of living science THE SCHISTOSOMIASIS  

E-Print Network (OSTI)

· Transfer of technology and building sustainability #12;43 million treatments in 5 ears During 2007 of using existingpp y g g Ministry of Health staff and school teachers and capital costs such as buildings over $80 per year #12;Sustainable prevention and control strategiesSustainable prevention and control

457

West Valley Accomplishments: Year in Review  

Energy.gov (U.S. Department of Energy (DOE))

WEST VALLEY, N.Y. – EM and its contractor at the West Valley Demonstration Project (WVDP) made significant progress in decommissioning the former nuclear fuel reprocessing center this year, with a focus on preparing for high-level waste (HLW) relocation, deactivation and demolition of site facilities and shipment of waste for off-site disposal.

458

EU Verbraucherrechte Apple One-Year Limited  

E-Print Network (OSTI)

EU Verbraucherrechte Apple One-Year Limited Warranty AppleCare Protection Plan CC Service Pack, Kabel. Zusätzlich bei allen Macs: 1x Time Capsule oder 1x Airport Gerät sowie 1x Apple Display Macs u sowie 1x Apple Display Material- u. Herstellungsfehler. Keine Leistung für Verschlei�teile wie Akku

Fiebig, Peter

459

Radiation Health Physics Four Year Plan  

E-Print Network (OSTI)

Radiation Health Physics Four Year Plan 2011-12 Radiation Health Physics (42 hrs) CH Grade Shielding Ext Dosimetry RHP 475 4 Project-Nuc Syst Design RHP 481 4 Radiation Protection Western Culture (3): RHP 483 4 Radiation Biology RHP 488 3 Radioecology Skills (12 hrs) CH Grade Writing I: WR 121 English

Tullos, Desiree

460

Year in Review 2007 GoddardView  

E-Print Network (OSTI)

Year in Review 2007 GoddardView National Aeronautics and Space Administration www.nasa.gov Volume 4, to stunning images from the highest-resolution satellite data products ever realized, to a visit from Security staff did a marvelous job in planning and coordinating the efforts of at least six different

Christian, Eric

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Student Handbook 2009-2010 Academic Year  

E-Print Network (OSTI)

or professional concerns that this handbook does not answer, be sure to ask someone in the Hayes School1 Student Handbook 2009-2010 Academic Year Published 1990 Revised 2004 #12;2 Preface All of us this handbook as a starting point toward realizing that success. While it provides important details about

Rose, Annkatrin

462

Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)  

SciTech Connect

This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

Not Available

1994-09-01T23:59:59.000Z

463

Artificial retina: Invention of the year  

NLE Websites -- All DOE Office Websites (Extended Search)

1513_retina 1513_retina 11/15/2013 The Argus II artificial retina, in which Lawrence Livermore has played a prominent roll, has enough resolution for people to see the lines of a crosswalk, find objects and read letters a couple of centimeters tall. Image by Dan Foley/Second Sight Argus II. Artificial retina: Invention of the year Anne M Stark, LLNL, (925) 422-9799, stark8@llnl.gov The artificial retina, in which Lawrence Livermore has played a prominent role, has earned a place in the top 25 best inventions of the year 2013 from Time Magazine. The invention also has garnered a 2013 best innovation designation by Popular Science. This Department of Energy funded project resulted in the creation of the first-ever retinal prosthesis -- or bionic eye -- approved in the United

464

Calendar Year 2011 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Calendar Year 2011 RSS December 21, 2011 Inspection Report: INS-L-12-01 Follow-up Review of Control and Accountability of Emergency Communication Network Equipment December 16, 2011 Inspection Report: INS-RA-L-12-01 Waste Disposal and Recovery Act Efforts at the Oak Ridge Reservation November 28, 2011 Special Report: OAS-RA-L-12-01 Special Inquiry on the Office of the Chief Financial Officer's Information Technology Expenditures November 15, 2011 Evaluation Report: OAS-M-12-01 The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011 November 10, 2011 Special Report: IG-0858 Management Challenges at the Department of Energy - Fiscal Year 2012 November 9, 2011 Audit Report: OAS-RA-12-02 The State of Nevada's Implementation of the Energy Efficiency and

465

Brookhaven Lecture Series | Archives | 401 - Current Year  

NLE Websites -- All DOE Office Websites (Extended Search)

401 - Current Year 401 - Current Year Brookhaven Lecture "488th Brookhaven Lecture: Magic Lenses for RHIC: Compensating beam-beam interaction" Wednesday, July 17, 2013, 4 pm Berkner Hall Auditorium Hosted by: Allen Orville During this lecture, Luo will start by discussing some collider fundamentals and the challenges of increasing rates of particle collisions, or luminosity, at the Relativistic Heavy Ion Collider (RHIC) at Brookhaven Lab. He will then introduce the electron lens system he helped develop at the Lab as he explains how this tool could help double the luminosity at RHIC and prepare the machine for physicists' future endeavors. Brookhaven Lecture "487th Brookhaven Lecture: 'Why Has Earth NOT Warmed as Much as Expected? And Why Is This So Important?'"

466

Calendar Year 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 15, 2012 November 15, 2012 Audit Report: OAS-FS-13-04 Department of Energy's Fiscal Year 2012 Consolidated Financial Statement November 15, 2012 Audit Report: OAS-FS-13-03 The Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit November 8, 2012 Evaluation Report: IG-0877 The Department's Unclassified Cyber Security Program - 2012 November 8, 2012 Examination Report: OAS-RA-13-04 The Department of Energy's American Recovery and Reinvestment Act Energy Efficiency and Conservation Block Grant Program - Efficiency Maine Trust November 7, 2012 Evaluation Report: OAS-L-13-01 The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012 November 6, 2012 Audit Report: IG-0876 The Department of Energy's Small Business Innovation Research and Small

467

Year 2000 Project Records.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DISPOSITION SCHEDULE DISPOSITION SCHEDULE Year 2000 Project Records 1/22/01 Year 2000 (Y2K) Project records have been created to document the effort of the Department of Energy to ensure that its information systems are Y2K compliant, i.e., able to perform all functions and applications when encountering dates beyond December 31, 1999. The records which document the overall Departmental and Field Office efforts, including design and modification work, are considered to be technologically significant. Some warrant permanent retention. The record keeping copy of the records identified in Item 1a of the schedule will be collected and maintained for the Department at DOE/HQ. Specific computer system documentation for the creation, modification, maintenance and testing of the systems will

468

Calendar Year 2012 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Calendar Year 2012 RSS December 21, 2012 Audit Report: OAS-L-13-03 The Management of the Plateau Remediation Contract December 21, 2012 Audit Report: IG-0879 Naval Reactors Information Technology System Development Efforts December 17, 2012 Audit Report: OAS-FS-13-08 Management Letter on the Audit of the Department of Energy's Consolidated Financial Statements for Fiscal Year 2012 December 11, 2012 Audit Report: IG-0878 Follow-up Audit of the Department's Cyber Security Incident Management Program December 3, 2012 Audit Report: OAS-RA-L-13-02 The Department's Implementation of Financial Incentive Programs under the Energy Efficiency and Conservation Block Grant Program November 30, 2012 Inspection Report: INS-O-13-02 Tactical Response Force Pursuit Operations at Idaho National Laboratory

469

SPEAR 3: the First Year of Operation  

SciTech Connect

The first electrons were accumulated in the newly completed 3-GeV SPEAR 3 storage ring on December 15, 2003, five days after the beginning of commissioning. By mid-January of 2004, 100 mA were stored, the maximum current allowed in the first phase of SPEAR 3 operation, and ring characterization and tuning continued until early March when the first photon beam line was opened for users. After the first year of operation the SPEAR 3 beam properties and ring performance had been extensively measured. These include micron stability using slow orbit feedback, an emittance coupling of {approx}0.1% and 50-h lifetimes. The performance of SPEAR 3 during its first year of commissioning and operation and the improvement plans are described.

Hettel, R.O.; /SLAC

2006-02-10T23:59:59.000Z

470

Environmental monitoring report for calendar year 1988  

SciTech Connect

The results of the 1988 environmental monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. Two of three tokamak machines, the Princeton Beta Experiment Modification (PBX-M) and the Tokamak Fusion Test Reactor (TFTR), were in operation during the year. The Environmental Committee, which is a standing committee of the Executive Safety Board (ESB), continued to review items of environmental importance. During CY88 no adverse effects to the environment or public resulted from any operational program activities at PPPL, and the Laboratory was in compliance with all applicable federal, state, and local environmental regulations. Over the last two years the Department of Energy conducted major environmental audits at all of its facilities, including PPPL. No significant environmental concerns were noted as a result of the inspection and sampling at PPPL. 43 refs., 25 figs., 33 tabs.

Stencel, J.R.

1989-05-01T23:59:59.000Z

471

Property:EndYear | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:EndYear Jump to: navigation, search This is a property of type Date. The allowed values for this property are: 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991 1990 1989 1988 1987 1986 1985 1984 1983 1982 1981 Pages using the property "EndYear" Showing 25 pages using this property. (previous 25) (next 25) A ASEAN-GIZ Regional Environmentally Sustainable Cities Programme - RESCP + 2012 + Africa - CCS capacity building + 2011 + Algeria-DLR Resource Assessments + 2008 + B Bangladesh-DLR Resource Assessments + 2004 + Bangladesh-GTZ Renewable Energy and Energy Efficiency Programme + 2011 + Belize-OAS Cellulosic Ethanol Market Assessment + 2009 +

472

Model Year 1999 Fuel Economy Guide  

NLE Websites -- All DOE Office Websites (Extended Search)

FUEL FUEL ECONOMY GUIDE MODEL YEAR 1999 DOE/EE-0178 Fuel Economy Estimates October 1998 1 CONTENTS PAGE Purpose of the Guide ..................................................... 1 Interior Volume ................................................................ 1 How the Fuel Economy Estimates are Obtained ........... 1 Factors Affecting MPG .................................................... 2 Fuel Economy and Climate Change ............................... 2 Gas Guzzler Tax ............................................................. 2 Vehicle Classes Used in This Guide. .............................. 2 Annuel Fuel Costs .......................................................... 3 How to Use the Guide .................................................... 4 Where to Re-order Guides

473

CERN 60 years of science for peace  

E-Print Network (OSTI)

What is the Universe made of? Where did it come from, where is it going and why does it behave the way it does? These are some of the questions that CERN set out to address 60 years ago when a small number of pioneering scientists created Europe’s first scientific international organization. Founded in the aftermath of the second world war, CERN is not only a first-class centre for fundamental research but also a pioneering adventure in international collaboration.

Fabienne, Marcastel

2014-01-01T23:59:59.000Z

474

Year 2 Report: Protein Function Prediction Platform  

SciTech Connect

Upon completion of our second year of development in a 3-year development cycle, we have completed a prototype protein structure-function annotation and function prediction system: Protein Function Prediction (PFP) platform (v.0.5). We have met our milestones for Years 1 and 2 and are positioned to continue development in completion of our original statement of work, or a reasonable modification thereof, in service to DTRA Programs involved in diagnostics and medical countermeasures research and development. The PFP platform is a multi-scale computational modeling system for protein structure-function annotation and function prediction. As of this writing, PFP is the only existing fully automated, high-throughput, multi-scale modeling, whole-proteome annotation platform, and represents a significant advance in the field of genome annotation (Fig. 1). PFP modules perform protein functional annotations at the sequence, systems biology, protein structure, and atomistic levels of biological complexity (Fig. 2). Because these approaches provide orthogonal means of characterizing proteins and suggesting protein function, PFP processing maximizes the protein functional information that can currently be gained by computational means. Comprehensive annotation of pathogen genomes is essential for bio-defense applications in pathogen characterization, threat assessment, and medical countermeasure design and development in that it can short-cut the time and effort required to select and characterize protein biomarkers.

Zhou, C E

2012-04-27T23:59:59.000Z

475

Comparison of 50-year and 70-year internal-dose-conversion factors  

SciTech Connect

The 50-year inhalation and ingestion dose commitments associated with an acute intake (of a radionuclide) of 3.7 x 10/sup 4/ Bq (1 ..mu..Ci) in one day were compared with the corresponding dose commitments calculated for a 70-year integration period resulting from a chronic intake of the same amount at a rate of 101 Bq/d (0.00274 ..mu..Ci/d) for one year. These values, known as dose conversion factors, estimate the dose accumulated during a given period of time following a unit of intake of a radionuclide. It was demonstrated that the acute intake of 3.7 x 10/sup 4/ Bq in one day and the chronic intake of 101 Bq/d for one year (a total intake of 3.7 x 10/sup 4/ Bq) result in essentially the same dose commitment for a relatively long integration period. Therefore, the comparison of 50-year acute dose conversion factors and 70-year chronic dose conversion factors is essentially only a measure of the additional dose accumulated in the 50 to 70 year period. It was found that for radionuclides with atomic mass less than 200 the percent difference in the 70-year and 50-year dose conversion factors was essentially zero in most cases. Differences of approximately 5 to 50% were obtained for dose conversion factors for most alpha emitters with atomic masses of greater than 200. Comparisons were made on the basis of both organ dose equivalent and effective dose equivalent. The implications and significance of these results are discussed.

Ryan, M.T.; Dunning, D.E. Jr.

1981-03-01T23:59:59.000Z

476

EMSL Fiscal Year 2008 Annual Report  

NLE Websites -- All DOE Office Websites (Extended Search)

8186 8186 EMSL Fiscal Year 2008 Annual Report MA Showalter January 2009 Prepared for the U.S. Department of Energy's Office of Biological and Environmental Research under Contract DE-AC05-76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 EMSL-the Environmental Molecular Sciences Laboratory 2008 Annual Report iii Contents 1 Overview ............................................................................................. 1-1-1 Science Themes ..................................................................................................................... 1-1-5 Proposals and Scientific User Access Modes ................................................................... 1-1-5 EMSL Scientific Grand Challenge ..................................................................................... 1-1-8

477

Five year rollover hedges for agricultural lenders  

E-Print Network (OSTI)

1. Summary of Treasury Bill Futures Contracts Required in a Rollover Hedge During the Period 9/1/76 - 6/1/83. . 2. A Comparison of Using a Rollover Hedge with a Fixed Rate Five Year loan for the Period 9/1/78 - 6/1/86 10 3. A Statistical... hedging article using the financial futures contracts. He discussed different hedging strategies and concluded that Government National Mortgage Association (GNMA) and Treasury Bill futures were effective in reducing price risk associated with mortgage...

Floyd, John Christopher

2012-06-07T23:59:59.000Z

478

Nuclear chain reaction: forty years later  

SciTech Connect

The proceedings from a 1982 symposium 40 years after the first controlled nuclear chain reaction took place in Chicago covers four sessions and public discussion. The session covered the history of the chain reaction; peaceful uses in technology, medicine, and biological science; peaceful uses in power generation; and nuclear weapons control. Among the speakers were Eugene Wigner, Glenn Seaborg, Alvin Weinberg, and others who participated in the first chain reaction experiments. The proceedings reflect differences of opinion among the scientists as well as the general public. References, slides, and tables used to illustrate the individual talks are included with the papers.

Sachs, R.G. (ed.)

1984-01-01T23:59:59.000Z

479

A System Degradation Study of 445 Systems Using Year-Over-Year Performance Index Analysis  

Energy.gov (U.S. Department of Energy (DOE))

This graphic summarizes the results of a study conducted by the SunPower Corporation, to assess the median degradation of a large number of systems. This is important because solar investors need proof of low degradation. The study, a project under DOE's SunShot Initiative, makes use of year-over-year performance index change analysis, a powerful and practical technique for assessing the median degradation of a large fleet of systems, which in this case includes a sample of 445.

480

Property:YearFounded | Open Energy Information  

Open Energy Info (EERE)

YearFounded YearFounded Jump to: navigation, search This is a property of type Date. The allowed values for this property are: 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991 1990 1989 1988 1987 1986 1985 1984 1983 1982 1981 1980 1979 1978 1977 1976 1975 1974 1973 1972 1971 1970 1969 1968 1967 1966 1965 1964 1963 1962 1961 1960 1959 1958 1957 1956 1955 1954 1953 1952 1951 1950 1949 1948 1947 1946 1945 1944 1943 1942 1941 1940 1939 1938 1937 1936 1935 1934 1933 1932 1931 1930 1929 1928 1927 1926 1925 1924 1923 1922 1921 1920 1919 1918 1917 1916 1915 1914 1913 1912 1911 1910 1909 1908 1907 1906 1905 1904 1903 1902 1901 1900 1899 1898 1897 1896 1895 1894 1893 1892 1891 1890 1889 1888 1887 1886 1885 1884 1883 1882 1881 1880 1879 1878 1877 1876 1875 1874 1873 1872 1871 1870 1869 1868 1867 1866 1865 1864 1863 1862 1861 1860 1859 1858 1857 1856 1855 1854

Note: This page contains sample records for the topic "years general-service lamps" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

State Energy Program Fiscal Year 2006 Formula Grant Guidance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fiscal Year 2006 Formula Grant Guidance State Energy Program Fiscal Year 2006 Formula Grant Guidance State Energy Program (SEP) Program Notice 06-1 Fiscal Year 2006 Formula Grant...

482

ON THE FRONT COVER Kristen Barnes | Fifth year  

E-Print Network (OSTI)

| Third year Ross Oliveira | First year Jewel Crosswell | First year Alex Tenney | College '11 Jeremy of the University ........................................ 2 Leadership BOOK IS AVAILABLE ONLINE AT www.virginia.edu/factbook.? #12;2 Short History of the University Thomas

Acton, Scott

483

Fuel Cell Technologies Office Multi-Year Research, Development...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan - Section 3.5 Manufacturing R&D Fuel Cell Technologies Office Multi-Year Research,...

484

Fuel Cell Technologies Office Multi-Year Research, Development...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan - Section 3.7 Hydrogen Safety, Codes and Standards Fuel Cell Technologies Office Multi-Year...

485

Fuel Cell Technologies Office Multi-Year Research, Development...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan - Section 3.9 Market Transformation Fuel Cell Technologies Office Multi-Year Research,...

486

Homes Weatherized by State for Calendar Year 2009 | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Calendar Year 2009 Homes Weatherized by State for Calendar Year 2009 HomesWeatherizedByStateDec2009.pdf More Documents & Publications TOTALARRAHomesWeatherizedthruQ32...

487

Fuel Cell Technologies Office Multi-Year Research, Development...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Cover Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan - Cover Cover of the Fuel Cell Technologies Office Multi-Year Research, Development,...

488

National Renewable Energy Laboratory 10 Year Site Plan FY 2007...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 National Renewable Energy Laboratory 10...

489

Fuel Cell Technologies Office Multi-Year Research, Development...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan - Appendix E: Acronyms Fuel Cell Technologies Office Multi-Year Research, Development, and...

490

Fiscal Year 2013 Department of Energy Annual Occupational Safety...  

Energy Savers (EERE)

Fiscal Year 2013 Department of Energy Annual Occupational Safety and Health Report for Federal Employees to the Secretary of Labor Fiscal Year 2013 Department of Energy Annual...

491

Fiscal Year 2012 Department of Energy Annual Occupational Safety...  

Energy Savers (EERE)

Fiscal Year 2012 Department of Energy Annual Occupational Safety and Health Report for Federal Employees to the Secretary of Labor Fiscal Year 2012 Department of Energy Annual...

492

US Energy Production over the Years Data | Department of Energy  

Office of Environmental Management (EM)

US Energy Production over the Years Data US Energy Production over the Years Data totalstateslink.xlsx totalsectorslink.xls us9302v3.json More Documents & Publications...

493

Office of Nuclear Energy Fiscal Year 2014 Budget Request | Department...  

Office of Environmental Management (EM)

Office of Nuclear Energy Fiscal Year 2014 Budget Request Office of Nuclear Energy Fiscal Year 2014 Budget Request The Office of Nuclear Energy (NE) supports the diverse civilian...

494

LANL shatters records in first year of accelerated shipping effort  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL shatters records in first year of accelerated shipping effort LANL shatters records in first year of accelerated shipping effort LANL set a record for transuranic waste...

495

Proposal Review Criteria for Fiscal Year 2014 | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

Review Criteria for Fiscal Year 2014 Proposal Review Criteria for Fiscal Year 2014 User proposals are peer reviewed against five criteria. For each criterion, the reviewer rates...

496

Fuel Cell Technologies Office Multi-Year Research, Development...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan The...

497

Calendar Year 2008 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Calendar Year 2008 RSS December 23, 2008 Special Report: IG-0808 Management Challenges at the Department of Energy December 11, 2008 Inspection Report: INS-O-09-01 Security Clearances at Lawrence Livermore National Laboratory and Sandia National Laboratory-California December 9, 2008 Audit Report: IG-0807 Cyber Security Risk Management Practices at the Bonneville Power Administration November 25, 2008 Inspection Report: IG-0806 40 MM Grenade Launcher Qualification Requirements at Department of Energy Sites November 20, 2008 Audit Report: IG-0805 Cyber Security Risk Management Practice at the Southeastern, Southwestern, and Western AreaPower Administrations November 19, 2008 Inspection Summary Report Issues Related to the Production of Components for the W76 Weapon System

498

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 17, 2005 November 17, 2005 Audit Report: IG-0709 Management of the Department's Isotope Program November 17, 2005 Audit Report: IG-0710 Management of Facility Contractors Assigned to the Washington, D.C. Area November 14, 2005 Audit Report: OAS-FS-06-01 Report o the Department of Energy's Fiscal Year 2005 Consolidated Financial Statements November 9, 2005 Audit Report: OAS-L-06-01 The Department of Energy's Radio Communications Systems November 9, 2005 Special Report: IG-0707 The Department of Energy's Response to Hurricanes Katrina and Rita November 9, 2005 Inspection Report: IG-0708 Quality Assurance Weaknesses in the Review of Yucca Mountain Electronic Mail for Relevancy to the Licensing Process October 17, 2005 Audit Report: IG-0706 Accelerated Tank Waste Retrieval Activities at the Hanford Site

499

Calendar Year 2006 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Calendar Year 2006 RSS December 18, 2006 Audit Letter Report: OAS-L-07-04 Inquiry to the Hotline Complaint on Possible Design Mistakes and Cost Overruns of the Linac Coherent Light Source Project at Stanford Linear Accelerator Center December 18, 2006 Audit Report: IG-0750 The Federal Energy Regulatory Commission's Program to Oversee Hydroelectric Dams December 14, 2006 Audit Report: IG-0749 The Department's Energy, Science,and Environment Sites' Implementationof the Design Basis Threat December 13, 2006 Special Report: IG-0748 Management Challenges at the Department of Energy December 5, 2006 Audit Report: IG-0747 The Department of Energy's Use of the Strategic Petroleum Reserve in Response to Hurricanes Katrina and Rita November 29, 2006 Inspection Report: IG-0746

500

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Calendar Year 2005 RSS December 30, 2005 Audit Report: OAS-M-06-03 Management Controls over the University of California's Contributions to the Los Alamos National Laboratory Foundation December 21, 2005 Audit Report: IG-0713 Status of the Mixed Oxide Fuel Fabrication Facility December 20, 2005 Audit Report: OAS-L-06-04 Federal Managers' Financial Integrity Act December 20, 2005 Audit Report: OAS-L-06-03 Defense Waste Processing Facility Operations at the Savannah River Site December 14, 2005 Special Report: IG-0712 Management Challenges at the Department of Energy December 5, 2005 Audit Report: IG-0711 Demolition and Replacement of Hanford's Radiological Calibration Laboratory November 25, 2005 Audit Report: OAS-M-06-02 Management Controls over Assessing Natural Resource Damage at Rocky Flats