Powered by Deep Web Technologies
Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Ten Year Site Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ten Year Ten Year Site Plans Ten Year Site Plans A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the Department of Energy's overall strategic plan. It is a comprehensive site-wide plan encompassing the needs of tenant activities. The TYSP is integral to and supports the Department's Planning, Programming, Budgeting, and Evaluation System (PPBES). The TYSP also describes site-specific actions the programs plans in order to meet stewardship, recapitalization and sustainability goals for their facilities. The Department requires all programs to update their TYSPs at least annually and submitted either concurrently with responses to the field budget call, or as directed to be consistent with the PPBES cycle.

2

National Renewable Energy Laboratory 10 Year Site Plan FY 2007...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 National Renewable Energy Laboratory 10...

3

Ten Year Site Plans | Department of Energy  

Office of Environmental Management (EM)

actions the programs plans in order to meet stewardship, recapitalization and sustainability goals for their facilities. The Department requires all programs to update their...

4

SRNS-RP-2013-00005 Savannah River Site Ten Year Site Plan FY  

NLE Websites -- All DOE Office Websites (Extended Search)

SRNS-RP-2013-00005 SRNS-RP-2013-00005 Savannah River Site Ten Year Site Plan FY 2014 - 2023 May 2013 United States Department of Energy Savannah River Site Ten Year Site Plan FY 2014 - 2023 May 2013 Prepared by: Savannah River Nuclear Solutions, LLC A Fluor Daniel Partnership Savannah River Site Aiken, SC 29808 SRNS-RP-2013-00005 Savannah River Site Ten Year Site Plan SRNS-RP-2013-00005 May 2013 DISCLAIMER This report was prepared by Savannah River Nuclear Solutions LLC (SRNS) for the United States Department of Energy under Contract No. DE-AC09-08SR22470 and is an account of work performed under that contract. Reference herein to any specific commercial product, process or services by trademark, name, manufacturer, or otherwise does not necessarily constitute or imply endorsement,

5

Twenty-Five Year Site Plan FY2013 - FY2037  

SciTech Connect

Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.

Jones, William H. [Los Alamos National Laboratory

2012-07-12T23:59:59.000Z

6

2014-2023 Ten-Year Site Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2014-2023 Ten-Year Site Plan 2014-2023 Ten-Year Site Plan 2014-2023 Ten-Year Site Plan The Idaho National Laboratory (INL) Ten-Year Site Plan for Fiscal Year 2014 outlines the vision, strategy, and progress toward delivering and sustaining world-leading capabilities needed for the core mission of the laboratory - nuclear energy research, development and demonstration (RD&D) and multi-program missions in energy security and national and homeland security. With the largest concentration of operating reactor and fuel cycle research facilities in the country, INL is the only national laboratory dedicated to civilian nuclear energy and the only national laboratory owned by the Department of energy (DOE) Office of Nuclear Energy (DOE-NE) When INL was launched in 2005, the first priority was to stabilize the

7

2014-2023 Ten-Year Site Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-2023 Ten-Year Site Plan 4-2023 Ten-Year Site Plan 2014-2023 Ten-Year Site Plan The Idaho National Laboratory (INL) Ten-Year Site Plan for Fiscal Year 2014 outlines the vision, strategy, and progress toward delivering and sustaining world-leading capabilities needed for the core mission of the laboratory - nuclear energy research, development and demonstration (RD&D) and multi-program missions in energy security and national and homeland security. With the largest concentration of operating reactor and fuel cycle research facilities in the country, INL is the only national laboratory dedicated to civilian nuclear energy and the only national laboratory owned by the Department of energy (DOE) Office of Nuclear Energy (DOE-NE) When INL was launched in 2005, the first priority was to stabilize the

8

National Renewable Energy Laboratory 10 Year Site Plan FY2007...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

resource and production constraints, have led to large increases in oil and natural gas prices, changing the industrial and commercial business environment. The NREL Ten-Year...

9

Office of Secure Transportation Twenty-Five Year Site Plan (TYSP)  

National Nuclear Security Administration (NNSA)

Secure Transportation Secure Transportation Twenty-Five Year Site Plan (TYSP) FY2013 FINAL Submitted June 29, 2012 National Nuclear Security Administration Office of Secure Transportation OST TYSP FY2013 Office of Secure Transportation Twenty-Five Year Site Plan NOTICE This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government, nor any agency thereof, nor any of their employees makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe on privately owned rights. Reference herein to any specific commercial product, process, or service by trade name,

10

EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement

11

Fire protection program fiscal year 1997 site support program plan - Hanford fire department  

SciTech Connect

The mission of the Hanford Fires Department (HFD) is to support the safe and timely cleanup of the Hanford Site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. this includes response to surrounding fire department districts under mutual aids agreements and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site. the fire department also provides site fire marshal overview authority, fire system testing, and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention and education.

Good, D.E., Westinghouse Hanford

1996-07-01T23:59:59.000Z

12

Fire Protection Program fiscal year 1996, site support program plan Hanford Fire Department. Revision 2  

SciTech Connect

The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report gives a program overview, technical program baselines, and cost and schedule baseline.

Good, D.E.

1995-09-01T23:59:59.000Z

13

Fire protection program fiscal year 1995 site support program plan, Hanford Fire Department  

SciTech Connect

The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report describes the specific responsibilities and programs that the HFD must support and the estimated cost of this support for FY1995.

Good, D.E.

1994-09-01T23:59:59.000Z

14

Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1  

SciTech Connect

In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

NONE

1995-09-01T23:59:59.000Z

15

Savannah River Site's Site Specific Plan  

SciTech Connect

This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

Not Available

1991-08-01T23:59:59.000Z

16

Planning for Academic Program Review Site Visits  

E-Print Network (OSTI)

Planning for Academic Program Review Site Visits 2013-2014 #12;Introduction o Purpose of this meeting: · Help academic units under review this year to plan for their site visit o Outline for today: · Planning your site visit · Graduate and Professional Student Senate (GPSS) role · Review process timeline

Van Volkenburgh, Elizabeth

17

Site Sustainability Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy U.S. Department of Energy Office of Legacy Management December 2013 LMS/S07225 This page intentionally left blank This page intentionally left blank U.S. Department of Energy Site Sustainability Plan December 2013 Doc. No. S07225 Page i Contents Abbreviations ................................................................................................................................. iii I. Executive Summary ...............................................................................................................1 II. Performance Review and Plan Narrative ...............................................................................9 1 GHG Reduction and Comprehensive GHG Inventory ...........................................................9

18

SITE MAINTENANCE PLAN CSMRI SITE REMEDIATION  

E-Print Network (OSTI)

...............................................................................................................5 5.2 Ground and Surface Water MonitoringSITE MAINTENANCE PLAN CSMRI SITE REMEDIATION June 29, 2004 Prepared by: Colorado School of Mines .................................................................................................4 5.0 SITE AIR AND WATER MONITORING

19

Planning for Years to Come  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education...

20

2014 Site Sustainability Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2014 Site Sustainability Plan 2014 Site Sustainability Plan The purpose of this Site Sustainability Plan (SSP) is to outline the strategies for managing, funding, and implementing...

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Idaho National Laboratory Ten-year Site Plan (2012 through 2021) -- DOE-NE's National Nuclear Capability -- Developing and Maintaining the INL Infrastructure  

SciTech Connect

To meet long-term objectives to transform the Idaho National Laboratory (INL), we are providing an integrated, long-term vision of infrastructure requirements that support research, development and demonstration (RD&D) goals outlined in the DOE strategic plans, including the NE Roadmap and reports such as Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook. The goal of the INL Ten-year Site Plan (TYSP) is to clearly link RD&D mission goals and INL core capabilities with infrastructure requirements (single and multi-program), establish the 10-year end-state vision for INL complexes, identify and prioritize infrastructure and capability gaps, as well as the most efficient and economic approaches to closing those gaps.

Cal Ozaki

2010-06-01T23:59:59.000Z

22

Savannah River Site Environmental Implementation Plan  

SciTech Connect

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Not Available

1989-08-01T23:59:59.000Z

23

NUCLEAR ENGINEERING Four Year Plan  

E-Print Network (OSTI)

NUCLEAR ENGINEERING Four Year Plan Fall 2009 Nuclear Engineering (67 hrs) CH Grade Perspectives (15;Nuclear Engineering Four Year Plan Starting Fall 2009 FALL Year 1 Credits WINTER Year 1 Credits SPRING I NE 452 3 Neutronic Analysis II NE 457 2 Nuclear Reactor Lab Western Culture (3): NE 467 4 Nucl

Tullos, Desiree

24

Annual update for the Nevada Test Site site treatment plan  

SciTech Connect

This document describes the purpose and scope of the Draft Annual Update for the Nevada Test Site Treatment Plan, the framework for developing the Annual Update, and the current inventory of mixed waste covered under the Site Treatment Plan and the Federal Facility Compliance Act Consent Order and stored at the Nevada Test Site. No Site Treatment Plan milestones or Federal Facility Cleanup Act Consent Order deadlines have been missed for fiscal year 1996. The Shipping Cask, a portion of the solvent sludge waste stream, and eight B-25 boxes from the lead-contaminated soil waste stream have been deleted from the Site Treatment Plan and the Federal Facility Cleanup Act Consent Order, in accordance with Part XI of the Federal Facility Cleanup Act Consent Order.

NONE

1997-04-01T23:59:59.000Z

25

Sustainable NREL - Site Sustainability Plan FY 2015 (Management Publication)  

SciTech Connect

NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

Not Available

2015-01-01T23:59:59.000Z

26

Site Sustainability Plan (SSP) 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Site Sustainability Plan (SSP) 2012 Site Sustainability Plan (SSP) 2012 2012 More Documents & Publications Site Sustainability Plan (SSP) 2013 2014 Site Sustainability Plan Site...

27

Site decommissioning management plan  

SciTech Connect

The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff`s strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites.

Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

1993-10-01T23:59:59.000Z

28

Site Support Program Plan Infrastructure Program  

SciTech Connect

The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

NONE

1995-09-26T23:59:59.000Z

29

Site Sustainability Plan (SSP) 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sustainability Plan (SSP) 2013 Site Sustainability Plan (SSP) 2013 Site Sustainability Plan (SSP) 2013 2013 Site Sustainability Plan More Documents & Publications Site...

30

Site Sustainability Plan (SSP) 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Site Sustainability Plan (SSP) 2010 Site Sustainability Plan (SSP) 2010 2010 More Documents & Publications Site Sustainability Plan (SSP) 2012 Site Sustainability Plan (SSP) 2013...

31

Annual Site Environmental Report. Calendar Year 1997  

SciTech Connect

This report summarizes the environmental status of Ames Laboratory for calendar year 1997. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring programs.

NONE

1997-12-01T23:59:59.000Z

32

NIST 3-Year Programmatic Plan  

E-Print Network (OSTI)

areas critical to the nation's economy.The America COMPETES Act outlines major roles for NIST-year period.NIST will continue to refine this plan as it works with the Administration to address national

33

Site and facility transportation services planning documents  

SciTech Connect

The Office of Civilian Radioactive Waste Management (OCRWM) will eventually ship Purchasers' (10 CFR 961.3) spent nuclear fuel from approximately 122 commercial nuclear facilities. The preparation and processing of Site and Facility Specific Transportation Services Planning Documents (SPDs) and Site Specific Servicing Plans (SSSPs) provides a focus for advanced planning and the actual shipping of waste, as well as the overall development of transportation requirements for the waste transportation system. SPDs will be prepared for each of the affected nuclear waste facilities over the next 2 years with initial emphasis on facilities likely to be served during the earliest years of the Federal Waste Management System (FWMS) operations. 3 figs., 1 tab.

Ratledge, J.E. (Oak Ridge National Lab., TN (USA)); Danese, L.; Schmid, S. (Science Applications International Corp., Oak Ridge, TN (USA))

1990-01-01T23:59:59.000Z

34

Planning for Solar Projects on Federal Sites | Department of...  

Office of Environmental Management (EM)

Planning for Solar Projects on Federal Sites Planning for Solar Projects on Federal Sites Photo of a photovoltaic system. Planning for the federal site solar project can begin...

35

Hanford Site Transuranic (TRU) Waste Certification Plan  

SciTech Connect

The Hanford Site Transuranic Waste Certification Plan establishes the programmatic framework and criteria within which the Hanford Site ensures that contract-handled TRU wastes can be certified as compliant with the WIPP WAC and TRUPACT-II SARP.

GREAGER, T.M.

1999-09-09T23:59:59.000Z

36

Hanford Site Transuranic (TRU) Waste Certification Plan  

SciTech Connect

The Hanford Site Transuranic Waste Certification Plan establishes the programmatic framework and criteria with in which the Hanford Site ensures that contract-handled TRU wastes can be certified as compliant with the WIPP WAC and TRUPACT-II SARP.

GREAGER, T.M.

1999-12-14T23:59:59.000Z

37

2013 Annual Planning Summary for the Sandia Site Office | Department...  

Energy Savers (EERE)

More Documents & Publications 2013 Annual Planning Summary for the Los Alamos Site Office LM Annual NEPA Planning Summary 2014 2012 Annual Planning Summary for Nevada Site Office...

38

CHEIBA Trust Employee Benefit Plan 2013 PlanYear  

E-Print Network (OSTI)

UNIVERSITY OF DENVER UNIVERSITY OF NORTHERN COLORADO WESTERN STATE COLORADO UNIVERSITY 2013 Benefit Plan YearCHEIBA Trust Employee Benefit Plan 2013 PlanYear Sponsored by - Colorado Higher Education Insurance HIGHER EDUCATION CENTER COLORADO SCHOOL OF MINES COLORADO STATE UNIVERSITY ­ PUEBLO COLORADO STATE

39

Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs  

SciTech Connect

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Not Available

1989-08-01T23:59:59.000Z

40

Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)  

SciTech Connect

This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

Not Available

1994-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Site support program plan for ICF Kaiser Hanford Company  

SciTech Connect

The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

Dieterle, S.E.

1996-09-27T23:59:59.000Z

42

Draft dry year tools (generation/planning)  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation > Planning > Generation Hydro Power Wind Power Monthly GSP BPA White Book Dry Year Tools Firstgov Dry Year Tools November 9, 2006 - Final Dry Year Guide: The Final Dry...

43

Environmental Assessment for the Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Environmental Assessment Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan at the Thomas Jefferson National Accelerator Facility Newport News, Virginia January 2007 U. S. Department of Energy Thomas Jefferson Site Office Newport News, VA DOE/EA-1534 January 2007 C:\TRANSFER\JANUARY 26 Final EA-1534-012607 (2).doc i TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... 1 1.0 INTRODUCTION ...........................................................................................11 1.1 PREVIOUS ACTIONS....................................................................................11 1.2 SCOPE OF THIS PROPOSED ACTION .......................................................11

44

Lawrence Livermore National Laboratory Site Lead Planning Activities, October 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Report Number: HIAR LLNL-2012-10-23 Site: Lawrence Livermore National Laboratory Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Site Lead Planning Activities at the Lawrence Livermore National Laboratory Dates of Activity 10/23/2012 - 10/24/2012 Report Preparer: Robert Freeman Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) Independent Oversight activity was to maintain site operational awareness of key nuclear safety performance areas, monitor ongoing site oversight and planning activities for Lawrence Livermore National Laboratory (LLNL) nuclear facilities, and identify and initiate coordination of future HSS oversight activities at the site, including planned HSS targeted reviews planned for Fiscal Year (FY) 2013.

45

Lawrence Livermore National Laboratory Site Lead Planning Activities, October 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report Number: HIAR LLNL-2012-10-23 Site: Lawrence Livermore National Laboratory Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Site Lead Planning Activities at the Lawrence Livermore National Laboratory Dates of Activity 10/23/2012 - 10/24/2012 Report Preparer: Robert Freeman Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) Independent Oversight activity was to maintain site operational awareness of key nuclear safety performance areas, monitor ongoing site oversight and planning activities for Lawrence Livermore National Laboratory (LLNL) nuclear facilities, and identify and initiate coordination of future HSS oversight activities at the site, including planned HSS targeted reviews planned for Fiscal Year (FY) 2013.

46

TWRS privatization phase 1 master site plan  

SciTech Connect

The DOE-RL is pursuing a new business strategy of hiring private contractors for treatment of Hanford Site tank wastes. This strategy is called `privatization` and includes design, permitting, construction, operation and deactivation of facilities for tank waste treatment. The TWRS Privatization Infrastructure Project consists of several sub-projects which will provide key services needed to support the privatization mission. This master site plan presently describes all pertinent aspects of the site and identifies all planned provisions for site development, utilities and other site services. It is a baseline document which will be revised as privatization proceeds through design, construction and start-up.

Parazin, R.J.

1996-09-30T23:59:59.000Z

47

BUSINESS PLAN LBNL Main Site  

E-Print Network (OSTI)

of petroleum products (new or used) in aboveground tanks or containers. NoDoes your facility have Regulated for which an emergency plan is required pursuant to 10 CFR Parts 30, 40 or 70? Yes Underground Petroleum

Eisen, Michael

48

Burn site groundwater interim measures work plan.  

SciTech Connect

This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

2005-05-01T23:59:59.000Z

49

Site Transition Plan Guidance, December 2004  

SciTech Connect

A short Department of Energy program document has been created to provide an outline on what the Site Transition Plan (STP) objectives are for the transition from the Office of Environmental Management to the newly established Office of Legacy Management.

none,

2004-12-01T23:59:59.000Z

50

SAMPLING AND ANALYSIS PLAN CSMRI SITE REMEDIATION  

E-Print Network (OSTI)

Littleton, CO 80127 #12;CSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 SAMPLING Environmental Consultants, Inc. Approved By: Date: Sally Cuffin Project Quality Assurance Manager New Horizons...................................................................................................................................3 2.5 Decision Rules

51

EM Five-Year Plan (FY 2008 - FY 2012) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Five-Year Plan (FY 2008 - FY 2012) EM Five-Year Plan (FY 2008 - FY 2012) EM Five-Year Plan (FY 2008 - FY 2012) The purpose of the EM Five Year Plan is to describe EM's planned strategies, funding and accomplishments over the next five years. This plan summarizes EM progress to date, presents EM performance measures, discusses assumptions and the EM decision-making process, and provides estimated EM funding over the FY 2008-2012 time period. Following this summary are sections that provide detailed information on each site including planned accomplishments at the target funding scenario. EM's five year planning targets are significantly different from the funding targets that appeared in the FY 2007-2011 Five Year Plan. Site planning allocations that formed the basis for the planned accomplishments

52

Y-12 Site-Sustainability Plan 2010  

SciTech Connect

The accomplishments to date and the long-range planning of the Y-12 National Security Complex Energy Management program support the Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy efficiency and sustainability and to achievement of the guiding principles. The site is diligently working toward establishing and prioritizing projects to reach the goals that Executive Orders 13514 and 13423 set forth. Y-12 is working to communicate its sustainment vision through procedural, engineering, operational, and management practices. The site will make informed decisions that are based on the application of the fi ve guiding principles for High Performance Sustainable Buildings (HPSBs) to the maximum extent possible. Current limitations in achievement of the goals lie in the existing Future Years National Security Program funding profiles. Y-12 will continue to execute energy projects as funding becomes available or as they can be accomplished incrementally within existing funding profiles. All efforts will be made to integrate energy initiatives with ongoing site mission objectives. Figures ES.1-ES.4 show some examples of sustainability activities at the Y-12 Complex.

Sherry, T. D.; Kohlhorst, D. P.; Little, S. K.

2010-12-01T23:59:59.000Z

53

Yucca Mountain Site Characterization Project Plan  

SciTech Connect

The purpose of this document is to describe the Yucca Mountain Site Characterization Project (YMP) and establish an approved YMP baseline against which overall YMP progress and management effectiveness shall be measured. For the sake of brevity, this document will be referred to as the Project Plan throughout this document. This Project Plan only addresses activities up to the submittal of the repository license application (LA) to the Nuclear Regulatory Commission (NRC). A new Project Plan will be submitted to establish the technical, cost, and schedule baselines for the final design and construction phase of development extending through the start of repository operations, assuming that the site is determined to be suitable.

Gertz, C.P.; Bartlett, J.

1992-01-01T23:59:59.000Z

54

Hanford Patrol Academy demolition sites closure plan  

SciTech Connect

The Hanford Site is owned by the U.S. Government and operated by the U.S. Department of Energy, Richland Operations Office. Westinghouse Hanford Company is a major contractor to the U.S. Department of Energy, Richland Operations Office and serves as co-operator of the Hanford Patrol Academy Demolition Sites, the unit addressed in this paper. This document consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3 (Revision 4), and a closure plan for the site. An explanation of the Part A Form 3 submitted with this closure plan is provided at the beginning of the Part A section. This Hanford Patrol Academy Demolition Sites Closure Plan submittal contains information current as of December 15, 1994.

Not Available

1993-09-30T23:59:59.000Z

55

Idaho National Laboratory Site Environmental Monitoring Plan  

SciTech Connect

This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Nonroutine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

Jenifer Nordstrom

2014-02-01T23:59:59.000Z

56

Annual Site Environmental Report Calendar Year 2007  

SciTech Connect

This report summarizes the environmental status of Ames Laboratory for calendar year 2007. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies 11 buildings owned by the Department of Energy (DOE). See the Laboratory's Web page at www.external.ameslab.gov for locations and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2007, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2007. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2007. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2003. Included in these efforts were battery and CRT recycling, waste white paper and green computer paper-recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, styrofoam peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Self Assessment Report, on its Affirmative Procurement Performance Measure. A performance level of 'A' was achieved in 2007 for Integrated Safety, Health, and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts.

Dan Kayser-Ames Laboratory

2007-12-31T23:59:59.000Z

57

Ames Laboratory site environmental report, calendar year 1995  

SciTech Connect

This report summarizes the environmental status of Ames Laboratory for calendar year 1995. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring programs.

NONE

1997-01-01T23:59:59.000Z

58

Multi-Year Research, Development, and Demonstration Plan | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Multi-Year Research, Development, and Demonstration Plan Multi-Year Research, Development, and Demonstration Plan The cover of the Geothermal Multi-Year Research, Development and...

59

Hanford site transuranic waste sampling plan  

SciTech Connect

This sampling plan (SP) describes the selection of containers for sampling of homogeneous solids and soil/gravel and for visual examination of transuranic and mixed transuranic (collectively referred to as TRU) waste generated at the U.S. Department of Energy (DOE) Hanford Site. The activities described in this SP will be conducted under the Hanford Site TRU Waste Certification Program. This SP is designed to meet the requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (CAO-94-1010) (DOE 1996a) (QAPP), site-specific implementation of which is described in the Hanford Site Transuranic Waste Characterization Program Quality Assurance Project Plan (HNF-2599) (Hanford 1998b) (QAPP). The QAPP defines the quality assurance (QA) requirements and protocols for TRU waste characterization activities at the Hanford Site. In addition, the QAPP identifies responsible organizations, describes required program activities, outlines sampling and analysis strategies, and identifies procedures for characterization activities. The QAPP identifies specific requirements for TRU waste sampling plans. Table 1-1 presents these requirements and indicates sections in this SP where these requirements are addressed.

GREAGER, T.M.

1999-05-13T23:59:59.000Z

60

Emergency Response Planning at the Nevada Test Site  

Science Journals Connector (OSTI)

......Dosimetry Article Emergency Response Planning at the Nevada Test Site D. Randerson A robust emergency response plan was...underground testing of nuclear weapons at the United States Nevada Test Site (NTS). This plan was designed to help protect the......

D. Randerson

1997-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Annual Site Environmental Report Calendar Year 2010  

SciTech Connect

This report summarizes the environmental status of Ames Laboratory for calendar year 2010. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. In 2010, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local regulations and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2010. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2010. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2010. Included in these efforts were battery and CRT recycling, miscellaneous electronic office equipment, waste white paper and green computer paper-recycling and corrugated cardboard recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, foamed polystyrene peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Performance Evaluation Measurement Plan, on its Affirmative Procurement Performance Measure. A performance level of 'A-' was achieved in 2010 for Integrated Safety, Health and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System (EMS) has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts. The Laboratory's EMS was audited in April 2009 by DOE-CH. There were four 'Sufficiently in Conformity' findings as a result of the audit. All four findings were tracked in the Laboratory's corrective action database for completion. Beryllium was used routinely at Ames Laboratory in the 1940's and 1950's in processes developed for the production of highly pure uranium and thorium in support of the historic Manhattan Project. Laboratory metallurgists also worked on a process to produce pure beryllium metal from beryllium fluoride. In the early 1950's, beryllium oxide powder was used to produce shaped beryllium and crucibles. As a result of that work, beryllium contamination now exists in many interstitial spaces (e.g., utility chases) and ventilation systems in Wilhelm, Spedding and Metals Development buildings. Extensive characterization and remediation efforts have occurred in 2009 and 2010 in order to better understand the extent of the contamination. Analysis of extensive sampling data suggests that a fairly wide dispersion of beryllium occurred (most likely in the 1950's and 60's) in Wilhelm Hall and in certain areas of Spedding Hall and Metals Development. Area air-sampling results and work-area surface characterizations indicate the exposure potential to current workers, building visitors and the public remains extremely low. This information is now used to guide cleaning efforts and to provide worker protection during remodeling and maintenance activities. Results were shared with the DOE's Former Worker Program to support former worker medical test

Kayser, Dan

2011-01-31T23:59:59.000Z

62

Site Office Safety System Oversight Staffing Plan - Blank  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Office Safety System Oversight Staffing Plan" Site Office Safety System Oversight Staffing Plan" "Date" "ACTIVITIES","Days for Activity in each Fiscal Year",,,,,,"Notes" ,"FY09","FY10","FY11","FY12","FY13","FY14" "Program Tasks" "Total Task Days",0,0,0,0,0,0,"Number of days required for activities that need to be completed regardless of number of staff" "Individual Tasks" "Qualification Training" "Continuing Training" "Collateral Duties" "Administrative" "Leave, Holidays" "Total Individual Days",0,0,0,0,0,0,"Number of days required for activities that need to be completed by each individual"

63

Idaho National Laboratory Site Pollution Prevention Plan  

SciTech Connect

It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.

E. D. Sellers

2007-03-01T23:59:59.000Z

64

Savannah River Site Approved Site Treatment Plan, 1998 Annual Update  

SciTech Connect

The U.S. Department of Energy, Savannah River Operations Office (DOE- SR),has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume I. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore,pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021.Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW.The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

Lawrence, B. [Westinghouse Savannah River Company, AIKEN, SC (United States); Berry, M.

1998-03-01T23:59:59.000Z

65

Lawrence Berkeley National Lab/ Site Specific Safety Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab/ Site Specific Safety Plan Lab/ Site Specific Safety Plan Site Specific Safety Plan Site Specific Safety Plan shall contain at a minimum: List by name & phone numbers the following person who will be on the project: Submit: Name of the On-site Superintendent & Phone. Submit: Name of the On-site Health and Safety Representative & Phone. Submit: Name of the person who is responsible for the implementation of safety plan. Submit: Resume & qualification of the person who is responsible for implantation of this projects safety plan. Include OSHA certifications. Submit: The companies' Policy statement on environment, safety and health. Submit: The companies' Policy on substance abuse and testing policy.

66

Radiation Health Physics Four Year Plan  

E-Print Network (OSTI)

Radiation Health Physics Four Year Plan 2011-12 Radiation Health Physics (42 hrs) CH Grade Shielding Ext Dosimetry RHP 475 4 Project-Nuc Syst Design RHP 481 4 Radiation Protection Western Culture (3): RHP 483 4 Radiation Biology RHP 488 3 Radioecology Skills (12 hrs) CH Grade Writing I: WR 121 English

Tullos, Desiree

67

FY 2015 Argonne Site Sustainability Plan | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

FY 2015 Argonne Site Sustainability Plan Argonne National Laboratory is committed to reducing its environmental footprint. Our site sustainability goals are in line with U.S....

68

Ames Laboratory Site Sustainability Plan | The Ames Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Ames Laboratory Site Sustainability Plan Document Number: NA Effective Date: 122012 File (public): Ames FY2013 SSP FINAL.pdf...

69

FINAL CLOSURE PLAN SURFACE IMPOUNDMENTS CLOSURE, SITE 300  

SciTech Connect

Lawrence Livermore National Laboratory of the University of California (LLNL) operates two Class II surface impoundments that store wastewater that is discharged from a number of buildings located on the Site 300 Facility (Site 300). The wastewater is the by-product of explosives processing. Reduction in the volume of water discharged from these buildings over the past several years has significantly reduced the wastewater storage needs. In addition, the impoundments were constructed in 1984, and the high-density polyethylene (HDPE) geomembrane liners are nearing the end of their service life. The purpose of this project is to clean close the surface impoundments and provide new wastewater storage using portable, above ground storage tanks at six locations. The tanks will be installed prior to closure of the impoundments and will include heaters for allowing evaporation during relatively cool weather. Golder Associates (Golder) has prepared this Final Closure Plan (Closure Plan) on behalf of LLNL to address construction associated with the clean closure of the impoundments. This Closure Plan complies with State Water Resources Control Board (SWRCB) Section 21400 of the California Code of Regulations Title 27 (27 CCR {section}21400). As required by these regulations and guidance, this Plan provides the following information: (1) A site characterization, including the site location, history, current operations, and geology and hydrogeology; (2) The regulatory requirements relevant to clean closure of the impoundments; (3) The closure procedures; and, (4) The procedures for validation and documentation of clean closure.

Lane, J E; Scott, J E; Mathews, S E

2004-09-29T23:59:59.000Z

70

1994 INEL site-specific plan  

SciTech Connect

This report presents plans for environmental restoration and waste management activities at the Idaho National Engineering Laboratory for fiscal year 1994. This years`s plan focuses on issues affecting the Environmental Restoration and Waste Management Programs. The Environmental Restoration Program is concerned with all aspects of assessment and cleanup of inactive operations. It involves assessing and cleaning up (where necessary) inactive INEL waste areas that could release harmful substances into the environment, as well as safely managing surplus nuclear facilities. The Waste Management program involves treatment, storage, and disposal of radioactive, hazardous, mixed, and industrial waste by DOE activities. This program is designed to protect the safety of INEL employees, the public, and the environment in the design, construction, maintenance, and operation of INEL treatment, storage, and disposal facilities. It operates facilities in a cost-effective, environmentally sound, regulatory compliant, and publicly acceptable manner.

Couch, B.

1994-05-01T23:59:59.000Z

71

Second ILAW Site Borehole Characterization Plan  

SciTech Connect

The US Department of Energy's Hanford Site has the most diverse and largest amounts of radioactive tank waste in the US. High-level radioactive waste has been stored at Hanford since 1944. Approximately 209,000 m{sup 3} (54 Mgal) of waste are currently stored in 177 tanks. Vitrification and onsite disposal of low-activity tank waste (LAW) are embodied in the strategy described in the Tri-Party Agreement. The tank waste is to be retrieved, separated into low- and high-level fractions, and then immobilized. The low-activity vitrified waste will be disposed of in the 200 East Area of the Hanford Site. This report is a plan to drill and characterize the second borehole for the Performance Assessment. The first characterization borehole was drilled in 1998. The plan describes data collection activities for determining physical and chemical properties of the vadose zone and saturated zone on the northeast side of the proposed disposal site. These data will then be used in the 2005 Performance Assessment.

SP Reidel

2000-08-10T23:59:59.000Z

72

FY 1987 current fiscal year work plan  

SciTech Connect

This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

Not Available

1986-12-01T23:59:59.000Z

73

Annual Planning Summaries: Nevada Site Office (NSO) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Planning Summaries: Nevada Site Office (NSO) Annual Planning Summaries: Nevada Site Office (NSO) Annual Planning Summaries: Nevada Site Office (NSO) January 31, 2012 2012 Annual Planning Summary for Nevada Site Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the Nevada Site Office. January 20, 2011 2011 Annual Planning Summary for Nevada Site Office (NSO) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Nevada Site Office (NSO). January 14, 2010 2010 Annual Planning Summary for Nevada Site Office Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24 months, and the

74

Annual Site Environmental Report Calendar Year 2005  

SciTech Connect

This report summarizes the environmental status of Ames Laboratory for calendar year 2005. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies 11 buildings owned by the Department of Energy (DOE). See the Laboratory's Web page at www.external.ameslab.gov for locations and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2005, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled accordingly to all applicable EPA, State, Local and DOE Orders. The most recent RCRA inspection was conducted by EPA Region VII in January 1999. The Laboratory received a notice of violation (NOV) which included five citations. There have been no inspections since then. The citations were minor and were corrected by the Laboratory within the time allocated by the EPA. See correspondence in Appendix D. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2005. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2005. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. Pollution awareness, waste minimization and recycling programs were implemented in 1990 and updated in 2003. Included in these efforts were battery and CRT recycling, waste white paper and green computer paper-recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, styrofoam peanuts, batteries, CRTs, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-CH, through the Laboratory's Self Assessment Report, on its Affirmative Procurement Performance Measure. A performance level of ''outstanding'' was achieved in 2005. The Laboratory underwent a voluntary Environmental Management Review (EMR) in 2003. Members of the Environmental Protection Agency (EPA) Region VII and Iowa Department of Natural Resources (IDNR) conducted the EMR in November 2003. The EMR was conducted as part of the process for developing and implementing an Environmental Management System (EMS) at the Laboratory. The final EMR report was received on June 19, 2003. Most of the recommendations were implemented to fulfill the EMS requirements for the ISO 14001:1996 standard. In 2004, the Laboratory ''Self Declared'' that it had fully integrated an EMS with its Integrated Safety Management System (ISMS) and met the requirements of Executive Order 13148. In November of 2005 DOE-CH conducted a self-declaration assessment of the Laboratory's EMS. The assessment found two nonconformities that the Laboratory promptly corrected, allowing the DOE-CH Ames Site Office to accept the Laboratory's self-declaration (See EMS Assessment letter, December 21, 2005 in Appendix D).

Dan Kayser

2005-12-31T23:59:59.000Z

75

Development of Site Transition Plan, Use of the Site Transition Framework,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of Site Transition Plan, Use of the Site Transition Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition This memorandum provides additional guidance on preparation of the Site Transition Plan (STP). Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition More Documents & Publications Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Process for Transition of Responsibilities Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy

76

Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan  

SciTech Connect

The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

Nielsen, T. (EG and G Rocky Flats, Inc., Golden, CO (USA)); Waage, E.; Miller, D. (Stoller (S.M.) Corp., Boulder, CO (USA))

1990-01-01T23:59:59.000Z

77

Hanford site transuranic waste certification plan  

SciTech Connect

As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation Pilot Plant (WIPP), the Hanford Site must ensure that its TRU waste meets the requirements of U.S. Department of Energy (DOE) Order 5820.2A, ''Radioactive Waste Management, and the Waste Acceptance Criteria for the Waste Isolation Pilot Plant' (DOE 1996d) (WIPP WAC). The WIPP WAC establishes the specific physical, chemical, radiological, and packaging criteria for acceptance of defense TRU waste shipments at WIPP. The WIPP WAC also requires that participating DOE TRU waste generator/treatment/storage sites produce site-specific documents, including a certification plan, that describe their management of TRU waste and TRU waste shipments before transferring waste to WIPP. The Hanford Site must also ensure that its TRU waste destined for disposal at WIPP meets requirements for transport in the Transuranic Package Transporter41 (TRUPACT-11). The U.S. Nuclear Regulatory Commission (NRC) establishes the TRUPACT-I1 requirements in the ''Safety Analysis Report for the TRUPACT-II Shipping Package'' (NRC 1997) (TRUPACT-I1 SARP).

GREAGER, T.M.

1999-05-12T23:59:59.000Z

78

Nevada Test Site Treatment Plan. Revision 2  

SciTech Connect

Treatment Plans (STPS) are required for facilities at which the US Department of Energy (DOE) or stores mixed waste, defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act and a radioactive material subject to the Atomic Energy Act. On April 6, 1993, DOE published a Federal Register notice (58 FR 17875) describing its proposed process for developing the STPs in three phases including a Conceptual, a Draft, and a Proposed Site Treatment Plan (PSTP). All of the DOE Nevada Operations Office STP iterations have been developed with the state of Nevada`s input. The options and schedules reflect a ``bottoms-up`` approach and have been evaluated for impacts on other DOE sites, as well as impacts to the overall DOE program. Changes may have occurred in the preferred option and associated schedules between the PSTP, which was submitted to the state of Nevada and US Environmental Protection Agency April 1995, and the Final STP (hereafter referred to as the STP) as treatment evaluations progressed. The STP includes changes that have occurred since the submittal of the PSTP as a result of state-to-state and DOE-to-state discussions.

NONE

1996-03-01T23:59:59.000Z

79

Nevada Test Site, site treatment plan 1999 annual update  

SciTech Connect

A Site Treatment Plan (STP) is required for facilities at which the US Department of Energy Nevada Operations Office (DOE/NV) generates or stores mixed waste (MW), defined by the Federal Facility Compliance Act (FFC Act) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act (RCRA) and a radioactive material subject to the Atomic Energy Act. This STP was written to identify specific treatment facilities for treating DOE/NV generated MW and provides proposed implementation schedules. This STP was approved by the Nevada Division of Environmental Protection (NDEP) and provided the basis for the negotiation and issuance of the FFC Act Consent Order (CO) dated March 6, 1996, and revised June 15, 1998. The FFC Act CO sets forth stringent regulatory requirements to comply with the implementation of the STP.

NONE

1999-03-01T23:59:59.000Z

80

Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site  

SciTech Connect

The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

Hutchison, J.; Jernigan, G.

1989-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1  

SciTech Connect

The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

NONE

1995-09-01T23:59:59.000Z

82

Nevada Test Site Resource Management Plan  

SciTech Connect

The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

NONE

1998-12-01T23:59:59.000Z

83

Tank waste remediation system multi-year work plan  

SciTech Connect

The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

Not Available

1994-09-01T23:59:59.000Z

84

Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan  

SciTech Connect

The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP.

GREAGER, T.M.

1999-09-09T23:59:59.000Z

85

Siberian Chemical Combine laboratory project work plan, fiscal year 1999  

SciTech Connect

The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites` input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves.

Morgado, R.E.; Acobyan, R.; Shropsire, R.

1998-12-31T23:59:59.000Z

86

TWRS phase I privatization site environmental baseline and characterization plan  

SciTech Connect

This document provides a plan to characterize and develop an environmental baseline for the TWRS Phase I Privatization Site before construction begins. A site evaluation study selected the former Grout Disposal Area of the Grout Treatment Facility in the 200 East Area as the TWRS Phase I Demonstration Site. The site is generally clean and has not been used for previous activities other than the GTF. A DQO process was used to develop a Sampling and Analysis Plan that would allow comparison of site conditions during operations and after Phase I ends to the presently existing conditions and provide data for the development of a preoperational monitoring plan.

Shade, J.W.

1997-09-01T23:59:59.000Z

87

Solid-State Lighting: DOE Five Year Commercialization Support Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Information Information Resources Printable Version Share this resource Send a link to Solid-State Lighting: DOE Five Year Commercialization Support Plan to someone by E-mail Share Solid-State Lighting: DOE Five Year Commercialization Support Plan on Facebook Tweet about Solid-State Lighting: DOE Five Year Commercialization Support Plan on Twitter Bookmark Solid-State Lighting: DOE Five Year Commercialization Support Plan on Google Bookmark Solid-State Lighting: DOE Five Year Commercialization Support Plan on Delicious Rank Solid-State Lighting: DOE Five Year Commercialization Support Plan on Digg Find More places to share Solid-State Lighting: DOE Five Year Commercialization Support Plan on AddThis.com... Conferences & Meetings Presentations Publications Webcasts Videos

88

Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan  

SciTech Connect

The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

GREAGER, T.M.

1999-12-14T23:59:59.000Z

89

Hanford Site Groundwater Monitoring for Fiscal Year 2005  

SciTech Connect

This report is one of the major products and deliverables of the Groundwater Remediation and Closure Assessment Projects detailed work plan for FY 2006, and reflects the requirements of The Groundwater Performance Assessment Project Quality Assurance Plan (PNNL-15014). This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2005 on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes in groundwater are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. The largest portions of these plumes are migrating from the central Hanford Site to the southeast, toward the Columbia River. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the west-central part of the Hanford Site. Hexavalent chromium is present in plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath all but one of the reactor areas. Technetium-99 and uranium plumes exceeding standards are present in the 200 Areas. A uranium plume underlies the 300 Area. Minor contaminant plumes with concentrations greater than standards include carbon-14, cesium-137, cis-1,2-dichloroethene, cyanide, fluoride, plutonium, and trichloroethene. Monitoring for the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 is conducted in 11 groundwater operable units. The purpose of this monitoring is to define and track plumes and to monitor the effectiveness of interim remedial actions. Interim groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100-K, 100-D, and 100-H) and strontium-90 (100-N) reaching the Columbia River. The objective of two interim remediation systems in the 200 West Area is to prevent the spread of carbon tetrachloride and technetium-99/uranium plumes. Resource Conservation and Recovery Act of 1976 groundwater monitoring continued at 25 waste management areas during fiscal year 2005: 15 under interim or final status detection programs and data indicate that they are not adversely affecting groundwater, 8 under interim status groundwater quality assessment programs to assess contamination, and 2 under final status corrective-action programs. During calendar year 2005, drillers completed 27 new monitoring wells, and decommissioned (filled with grout) 115 unneeded wells. Vadose zone monitoring, characterization, and remediation continued in fiscal year 2005. Remediation and associated monitoring continued at a soil-vapor extraction system in the 200 West Area, which removes gaseous carbon tetrachloride from the vadose zone. DOE uses geophysical methods to monitor potential movement of contamination beneath former waste sites.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2006-02-28T23:59:59.000Z

90

10 Year Transmission Plan for the Western Electricity Interconnection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

91

Nevada Test Site Resource Management Plan: Annual summary, January 2000  

SciTech Connect

The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

NONE

2000-01-01T23:59:59.000Z

92

WECC 10-Year Plan general presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bradley Nickell Bradley Nickell Director of Transmission Planning Regional Transmission Expansion Planning (RTEP) DOE EAC Meeting October 20, 2011 2 Regional Transmission Expansion Planning What have we been asked to do? Regional Transmission Expansion Planning (RTEP) Expand the breadth and depth of WECC's existing regional transmission planning processes. * Expand stakeholder participation * Increase the understanding of the connection between reliability, cost, and environment * Produce credible, publically available data and models 3 RTEP Organizational Funding Diagram VGS Integration Topic B WGA WIRAB/CREPC Public Policy $12.0M WREZ Phases 3 & 4 National Labs Request for Technical Assistance/Coordination Topic A WECC/TEPPC Interconnection-wide Planning $14.5M Columbia

93

The UC Berkeley Strategic Academic Plan: Five-Year Review  

E-Print Network (OSTI)

The UC Berkeley Strategic Academic Plan: Five-Year Review A Report to the Chancellor by the Office://www.berkeley.edu/news/media/releases/2003/05/sap/plan.pdf. A one-year review was done in 2003. This five-year review provides to complete (Strategic Plan). The current standard is 18 months; the average time is closer to 25 months

Jacobs, Lucia

94

NIST Three Year Programmatic Plan 1 Introduction  

E-Print Network (OSTI)

, standards, and technology in a range of strategic areas critical to the nation's economy. The America will continue to refine this plan as it works with the Administration to address national priorities. This Plan is a lead agency in DOC's efforts towards its innovation goal to Foster a more innovative U.S. economy ­ one

95

Hanford Advisory Board Fiscal Year 2015 Interim Work Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Advisor Nina Menard, Ecology Action: Public Involvement Presentation by DOE-RL RAP Hanford Advisory Board Fiscal Year 2015 Interim Work Plan Adopted by consensus September 5,...

96

Rocky Flats 10 year plan: over 500 structures to be demolished  

SciTech Connect

Rocky Flats Environmental Technology Site has prepared a Ten Year Plan (Plan) that demonstrates how the Site would achieve accelerated cleanup and rapidly reduce the risks the Site currently poses to its workers, the public, and the environment. A major element of the Plan is the decontamination and demolition of over 500 Site facilities, including all of the former nuclear production facilities, by the end of 2006. Facilities used for the storage of plutonium, treatment of low-level mixed waste, and several office building would remain until the plutonium is removed or there is no longer a need for the facility, in which case it would be demolished. While the Plan considers all aspects of the cleanup and closure, this paper focuses on the challenges posed by the removal of highly contaminated equipment and the demolition of structures. This paper describes near- term decommissioning projects as well as the long range plans and budgets. Cash flow ultimately controls schedule, and sharing of budget priorities among processing of special nuclear material, disposing of waste, and cleaning up the environment has to be juggled carefully to attain the goals of the Plan. The total cost of the Plan exceeds $5 billion, and over $1 billion will be spent on decommissioning activities. Following removal of the plutonium and the demolition of the plutonium storage and remaining Site facilities by the end of 2015, the cost to perform the long-term environmental monitoring at the Site is estimated to be $10 million per year.

Evans, B. [Kaiser-Hill L.L.C., Rocky Flats, CO (United States); Bengel, P. [Rocky Mountain Remediation Services, L.L.C., Rocky Flats, CO (United States)

1997-03-01T23:59:59.000Z

97

Ames Laboratory annual site environmental report, calendar year 1996  

SciTech Connect

This report summarizes the environmental status of Ames Laboratory for calendar year 1996. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring programs. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies twelve buildings owned by the Department of Energy (DOE). The Laboratory also leases space in ISU owned buildings. Laboratory activities involve less than ten percent of the total chemical use and approximately one percent of the radioisotope use on the ISU campus. In 1996, the Office of Assurance and Assessment merged with the Environment, Safety and Health Group forming the Environment, Safety, Health and Assurance (ESH and A) office. In 1996, the Laboratory accumulated and disposed of wastes under US Environmental Protection Agency (EPA) issued generator numbers. Ames Laboratory submitted a Proposed Site Treatment Plan to EPA in December 1995. This plan complied with the Federal Facilities Compliance Act (FFCA). It was approved by EPA in January 1996. The consent agreement/consent order was issued in February 1996. Pollution awareness, waste minimization and recycling programs, implemented in 1990 and updated in 1994, continued through 1996. Included in these efforts were a waste white paper and green computer paper recycling program. Ames Laboratory also continued to recycle salvageable metal and used oil, and it recovered freon for recycling. All of the chemical and nearly all of the radiological legacy wastes were properly disposed by the end of 1996. Additional radiological legacy waste will be properly disposed during 1997.

NONE

1998-04-01T23:59:59.000Z

98

Idaho National Laboratory Site Environmental Monitoring Plan  

SciTech Connect

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

Joanne L. Knight

2012-08-01T23:59:59.000Z

99

Savannah River Site Interim Waste Management Program Plan FY 1991--1992  

SciTech Connect

The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

Chavis, D.M.

1992-05-01T23:59:59.000Z

100

Savannah River Site Interim Waste Management Program Plan FY 1991--1992  

SciTech Connect

The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

Chavis, D.M.

1992-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Savannah River Site Approved Site Treatment Plan, 1998 Annual Update  

SciTech Connect

The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

Lawrence, B.

1999-04-20T23:59:59.000Z

102

Savannah River Site approved site treatment plan, 2000 annual update  

SciTech Connect

The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

Lawrence, B.

2000-04-20T23:59:59.000Z

103

Four-Year Plan | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Four-Year Plan | National Nuclear Security Administration Four-Year Plan | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Four-Year Plan Home > content > Four-Year Plan Four-Year Plan Click here to read highlights of GTRI's contributions to President Obama's Four-Year Effort to secure vulnerable nuclear material around the world. Javascript is required to view this map.

104

FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2009 Operational Plan FY2009 Operational Plan - Goal 1 Summary FY2009 Operational Plan - Goal 2 Summary

105

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development activities for the electric transmission and distribution system. OE has prepared this program plan pursuant to the requirements of Section 925 of the Energy Policy Act of 2005 (EPACT), as outlined below. This plan delineates research directions and priorities. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs.

106

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development activities for the electric transmission and distribution system. OE has prepared this program plan pursuant to the requirements of Section 925 of the Energy Policy Act of 2005 (EPACT), as outlined below. This plan delineates research directions and priorities. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs.

107

EMERGENCY READINESS ASSURANCE PLAN (ERAP) FOR FISCAL YEAR (FY) 2014  

SciTech Connect

This Emergency Readiness Assurance Plan (ERAP) for Fiscal Year (FY) 2014 in accordance with DOE O 151.1C, Comprehensive Emergency Management System. The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for FY-15. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, INL Emergency Plan/RCRA Contingency Plan.

Shane Bush

2014-09-01T23:59:59.000Z

108

TWRS Privatization Phase 1 Master Site Plan  

SciTech Connect

This document provides a reference for the development of the Tank Waste Remediation System (TWRS) Privatization Phase I site (former Grout Disposal Compound) and the upgrades and extension to the site of the 200 East Area inter- and intra-area roads and various utilities.

PARAZIN, R.J.

1999-08-16T23:59:59.000Z

109

FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Plan and Closeout Summary, Fiscal Year 2012 Operational Plan and Closeout Summary, Fiscal Year 2012 FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2012 Operational Plan FY2012 Operational Plan Closeout Summary More Documents & Publications FTCP Biennial Report - Calendar Years 2011-2012

110

FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Plan and Closeout Summary, Fiscal Year 2011 Operational Plan and Closeout Summary, Fiscal Year 2011 FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2011 Operational Plan FY2011 Operational Plan Closeout Summary More Documents & Publications FTCP Biennial Report - Calendar Years 2011-2012

111

BACHELOR OF SCIENCE IN RADIOLOGICAL SCIENCE (Suggested 4 Year Plan)  

E-Print Network (OSTI)

Procedures II Clinical Experience Medical Terminology Radiation Protection II Elementary Radiation ProtectionBACHELOR OF SCIENCE IN RADIOLOGICAL SCIENCE (Suggested 4 Year Plan) Please note that this is a potential plan for completing your degree within four years. The order of classes does not necessarily need

Benos, Panayiotis "Takis"

112

Site environmental report for calendar year 1996  

SciTech Connect

The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts to the US Department of Energy (DOE) Strategic Petroleum Reserve (SPR). The SER, provided annually in accordance with DOE Order 5400.1, serves the public by summarizing monitoring data collected to assess how the SPR impacts the environment. The SER provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits.

NONE

1997-08-01T23:59:59.000Z

113

Remedial action work plan for the Colonie site. Revision 1  

SciTech Connect

The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab.

Not Available

1985-08-01T23:59:59.000Z

114

Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Technical Plan  

Energy.gov (U.S. Department of Energy (DOE))

The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

115

Proposed Site Treatment Plan (PSTP). STP reference document  

SciTech Connect

The Department of Energy (DOE) is required by Section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (FFCAct), to prepare a plan describing the development of treatment capacities and technologies for treating mixed waste (hazardous/radioactive waste). DOE decided to prepare its site treatment plan in a three phased approach. The first phase, called the Conceptual Site Treatment Plan (CSTP), was issued in October 1993. At the Savannah River Site (SRS) the CSTP described mixed waste streams generated at SRS and listed treatment scenarios for each waste stream utilizing an onsite, offsite DOE, and offsite or onsite commercial or vendor treatment option. The CSTP is followed by the Draft Site Treatment Plan (DSTP), due to be issued in August 1994. The DSTP, the current activity., will narrow the options discussed in the CSTP to a preferred treatment option, if possible, and will include waste streams proposed to be shipped to SRS from other DOE facilities as well as waste streams SRS may send offsite for treatment. The SRS DSTP process has been designed to address treatment options for each of the site`s mixed waste streams. The SRS Proposed Site Treatment Plan (PSTP) is due to be issued in February 1995. The compliance order would be derived from the PSTP.

NONE

1995-02-22T23:59:59.000Z

116

LHC plans extra year for Higgs hunt  

Science Journals Connector (OSTI)

... If the plan is implemented, the Large Hadron Collider (LHC), located at CERN, near Geneva, Switzerland, will run until the end of ... management and council in January. At stake is the particle many physicists see as the LHC's raison d'tre: the Higgs. Theorists believe that the Higgs particle, together ...

Geoff Brumfiel

2010-12-10T23:59:59.000Z

117

Hanford Site Environmental Surveillance Data Report for Calendar Year 2003  

SciTech Connect

This data report contains the actual raw data used to create the tables and summaries in the annual Hanford Site Environmental Report for Calendar Year 2003.

Bisping, Lynn E.

2004-09-01T23:59:59.000Z

118

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance .Employees shall be encouraged to become involved in the identification and control of hazards in the workplace. (DOE O 440.1A CRD) Workers shall have the right, without reprisal, to accompany DOE worker

119

Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online February 3, 2011 - 12:00pm Addthis Media Contact Danielle Miller (DOE-ID) 208-526-5709 An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy's (DOE) Idaho site. "This report verifies that the performance of cleanup actions at the Idaho Site continues to be protective of human health and the environment," said Nicole Hernandez, DOE's project manager for the five-year review. "The findings in the report demonstrate a strong collaborative effort by CH2M-WG Idaho (CWI), DOE, the Environmental

120

Paraho oil shale module. Site development plan, Task 4  

SciTech Connect

A management plan and schedule which covers all requirements for gaining access to the site and for conducting a Paraho Process demonstration program have been prepared. The oil shale available should represent a regional resource of suitable size and quality for commercial development. Discussed in this report are: proof of ownership; requirements for rights-of-way for access to the site; local zoning restrictions; water rights; site availability verification; and other legal requirements. (DMC)

Not Available

1981-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 0  

SciTech Connect

The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plans scope comprises sample collection and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.

Marutzky, Sam; Farnham, Irene

2014-10-01T23:59:59.000Z

122

NUIN Individual Development Plans (IDP) Student Matriculation Year Advisor Date  

E-Print Network (OSTI)

NUIN Individual Development Plans (IDP) Student Matriculation Year Advisor Date Progress during: Summary of Coursework Progress (The Advisor should complete this section) Student's progress in this area): #12;Summary of Research Progress (The Advisor should complete this section) Student's progress

Contractor, Anis

123

Fire Protection Engineering Four Year Academic Plan Name:_______________________________________________ UID:___________________________  

E-Print Network (OSTI)

Fire Protection Engineering Four Year Academic Plan Name;FIRE PROTECTION ENGINEERING NAME: _____________________________________ Major Requirements Requirements Dev Seminar 1 ENFP 405 - Structural Fire Protection 3 Requirements Course Credits Grade ENFP 410

Shapiro, Benjamin

124

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

125

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

126

1995 Site Development Plan. [Annual report  

SciTech Connect

The mission of the Lawrence Livermore National Laboratory (LLNL) is to apply science and technology in the national interest. LLNL`s focus is on global security, global ecology, and bioscience. Laboratory, employees are working with industrial and academic partners to increase national economic competitiveness and improve science education. Laboratory`s mission is dynamic and has been changed over the years to meet new national needs.

NONE

1995-12-31T23:59:59.000Z

127

Site Environmental Report-Calendar Year 2001  

SciTech Connect

The Laboratory's mission is to conduct fundamental research in the physical, chemical, materials, mathematical sciences and engineering which underlie energy generating, conversion, transmission and storage technologies, environmental improvement, and other technical areas essential to national needs. These efforts will be maintained so as to contribute to the achievement of the Department of Energy's Missions and Goals; more specifically, to increase the general levels of scientific knowledge and capabilities, to prepare engineering and physical sciences students for future scientific endeavors, and to initiate nascent technologies and practical applications arising from our basic scientific programs. The Laboratory will approach all its operations with the safety and health of all workers as a constant objective and with genuine concern for the environment. Ames Laboratory does not conduct classified research. The primary purpose of this report is to summarize the performance of Ames Laboratory's environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2001. This report is a working requirement of Department of Energy Order 231.1, Environment, Safety, and Health Reporting''.

Dan Kayser

2002-09-03T23:59:59.000Z

128

Rational planning of offshore on-site measurements  

SciTech Connect

Design of cost optimal experiment plans on the basis of a preposterior analysis is discussed. In particular, rational planning of on-site response measurements on offshore structures in order to update probabilistic models for fatigue life estimation is addressed. Special emphasis is given to modeling of uncertainties in the transfer function. An example is given in which the answers to the questions whether to experiment or not and what is the optimal time duration of response measurements are sought.

Kroon, I.B.; Sorensen, J.D.; Faber, M.H. [Univ. of Aalborg (Denmark)

1994-12-31T23:59:59.000Z

129

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

130

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

131

Annual site environmental report for calendar year 1994  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1994 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site.``

NONE

1994-12-31T23:59:59.000Z

132

Site characterization plan overview: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Consultation Draft  

SciTech Connect

The consultation draft of the site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site-characterization plan; it is not a substitute for the site-characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the disposal system -- the site, the repository, and the waste package -- preceding the discussion of the characterization program to be carried out at the Yucca Mountain site. It is intended primarily for the management staff of organizations involved in the DOE`s repository program -- staff who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 22 figs., 1 tab.

NONE

1988-01-01T23:59:59.000Z

133

Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site  

SciTech Connect

The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

NSTec Environmental Management

2008-09-01T23:59:59.000Z

134

Ames Laboratory Site Environmental Report, Calendar year 1991  

SciTech Connect

The summarized data and conclusions from the Ames Laboratory environmental monitoring program are presented in this Annual Site Environmental Report. This program is a working requirement of Department of Energy (DOE) Order 5484.1, ``Environmental Protection, Safety, and Health Protection Information Reporting Requirements`` and Order 5400.1, ``General Environmental Protection Program.`` Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies several buildings owned by the DOE. The Laboratory also leases space in ISU-owned buildings. Laboratory research activities involve less than ten percent of the total chemical use and one percent of the radioisotope use on the ISU campus. Ames Laboratory is responsible for a small chemical burial site, located on ISU property. The site was used for the disposal of chemical and metal slags from thorium and uranium production. Samples of water from existing test wells and upstream and downstream sites on the nearby Squaw Creek show no detectable migration of the contents of the burial site. A Site Assessment plan submitted to the State of Iowa Department of Natural Resources (DNR) was approved. A Remedial Investigation/Feasibility Study work plan has been completed for additional studies at the site. This has been reviewed and approved by the DOE Chicago Field Office and the DNR. A National Environmental Policy Act (NEPA) review of the site resulted in a categorical exclusion finding which has been approved by the DOE. Ames Laboratory has an area contaminated by diesel fuel at the location of a storage tank which was removed in 1970. Soil corings and groundwater have been analyzed for contamination and an assessment written. Pollution awareness and waste minimization programs and plans were implemented in 1990. Included in this effort was the implementation of a waste white paper and green computer paper recycling program.

Mathison, L.

1991-12-31T23:59:59.000Z

135

Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 9, Index  

SciTech Connect

This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules.

NONE

1988-12-01T23:59:59.000Z

136

LIVERMORE SITE OFFICE CONTRACT MANAGEMENT PLAN For LAWRENCE LIVERMORE NATIONAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LIVERMORE SITE OFFICE CONTRACT MANAGEMENT PLAN For LAWRENCE LIVERMORE NATIONAL LABORATORY CONTRACT NO. DE-AC52-07NA27344 LSO_CMP_6-10-088 i CONTENTS Contents 1. INTRODUCTION.............................................................................................................. 3 2. PURPOSE .......................................................................................................................... 3 2.2 Maintenance and Distribution ......................................................................................... 4 3. CONTRACT SUMMARY AND PRINCIPAL FEATURES............................................. 4 3.1 Contract Summary ...........................................................................................................

137

Draft Site Treatment Plan (DSTP), Volumes I and II  

SciTech Connect

Site Treatment Plans (STP) are required for facilities at which the DOE generates or stores mixed waste. This Draft Site Treatment Plan (DSTP) the second step in a three-phase process, identifies the currently preferred options for treating mixed waste at the Savannah River Site (SRS) or for developing treatment technologies where technologies do not exist or need modification. The DSTP reflects site-specific preferred options, developed with the state`s input and based on existing available information. To the extent possible, the DSTP identifies specific treatment facilities for treating the mixed waste and proposes schedules. Where the selection of specific treatment facilities is not possible, schedules for alternative activities such as waste characterization and technology assessment are provided. All schedule and cost information presented is preliminary and is subject to change. The DSTP is comprised of two volumes: this Compliance Plan Volume and the Background Volume. This Compliance Plan Volume proposes overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) of RCRA and procedures for converting the target dates into milestones to be enforced under the Order. The more detailed discussion of the options contained in the Background Volume is provided for informational purposes only.

D`Amelio, J.

1994-08-30T23:59:59.000Z

138

Configuration management program plan for Hanford site systems engineering  

SciTech Connect

This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

Kellie, C.L.

1996-03-28T23:59:59.000Z

139

Hanford Site Environmental Report for Calendar Year 2005  

SciTech Connect

This report, published annually since 1958, includes information and summary analytical data that (1) provide an overview of activities at the Hanford Site during calendar year 2005; (2) demonstrate the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and U.S. Department of Energy (DOE) policies and directives; (3) characterize Hanford Site environmental management performance; and (4) highlight significant environmental programs.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2006-09-28T23:59:59.000Z

140

Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites  

SciTech Connect

This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.

None

2012-10-24T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Plan for addressing issues relating to oil shale plant siting  

SciTech Connect

The Western Research Institute plan for addressing oil shale plant siting methodology calls for identifying the available resources such as oil shale, water, topography and transportation, and human resources. Restrictions on development are addressed: land ownership, land use, water rights, environment, socioeconomics, culture, health and safety, and other institutional restrictions. Descriptions of the technologies for development of oil shale resources are included. The impacts of oil shale development on the environment, socioeconomic structure, water availability, and other conditions are discussed. Finally, the Western Research Institute plan proposes to integrate these topics to develop a flow chart for oil shale plant siting. Western Research Institute has (1) identified relative topics for shale oil plant siting, (2) surveyed both published and unpublished information, and (3) identified data gaps and research needs. 910 refs., 3 figs., 30 tabs.

Noridin, J. S.; Donovan, R.; Trudell, L.; Dean, J.; Blevins, A.; Harrington, L. W.; James, R.; Berdan, G.

1987-09-01T23:59:59.000Z

142

Hanford Site surface soil radioactive contamination control plan, March 1993  

SciTech Connect

The Decommissioning and Resource Conservation and Recovery Act Closure Program is responsible to the US Department of Energy Richland Field Office, for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities and Resource Conservation and Recovery Act of 1976 closures at the Hanford Site. This program also manages the Radiation Area Remedial Action that includes the surveillance, maintenance, decontamination, and/or interim stabilization of inactive burial grounds, cribs, ponds, trenches, and unplanned release sites. This plan addresses only the Radiation Area Remedial Action activity requirements for managing and controlling the contaminated surface soil areas associated with these inactive sites until they are remediated as part of the Hanford Site environmental restoration process. All officially numbered Radiation Area Remedial Action and non-Radiation Area Remedial Action contaminated surface soil areas are listed in this document so that a complete list of the sites requiring remediation is contained in one document.

Mix, P.D.; Winship, R.A.

1993-04-01T23:59:59.000Z

143

Multi-Year Program Plan, Building Regulatory Programs: 2010-2015...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Year Program Plan, Building Regulatory Programs: 2010-2015 Multi-Year Program Plan, Building Regulatory Programs: 2010-2015 This Multi-Year Program Plan covers Building Regulatory...

144

Hanford Site Anuran Monitoring Report for Calendar Year 2013  

SciTech Connect

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, DOE/EIS-0222-F) which is the Environmental Impact Statement for Hanford Site activities, helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with NEPA.

Wilde, Justin W.; Johnson, Scott J.; Lindsey, Cole T.

2014-02-13T23:59:59.000Z

145

Hanford Site Raptor Nest Monitoring Report for Calendar Year 2013  

SciTech Connect

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, DOE/EIS-0222-F) which is the Environmental Impact Statement for Hanford Site activities, helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with NEPA.

Nugent, John J.; Lindsey, Cole T.; Wilde, Justin W.

2014-02-13T23:59:59.000Z

146

CSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TABLE OF CONTENTS  

E-Print Network (OSTI)

..........................................................................................................................................5 9.0 Ground- and Surface-Water MonitoringCSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TASK PLAN TABLE OF CONTENTS 1 .............................................................................................5 FIGURES #12;CSMRI Site Remediation Task Plan March 31, 2004 TASK PLAN CSMRI SITE REMEDIATION 1

147

Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan  

SciTech Connect

The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

GREAGER, T.M.

2000-12-06T23:59:59.000Z

148

Idaho National Laboratory Site Long-Term Stewardship Implementation Plan  

SciTech Connect

The U.S. Department of Energy has established long-term stewardship programs to protect human health and the environment at sites where residual contamination remains after site cleanup. At the Idaho National Laboratory Site, Comprehensive Environmental Response, Compensation, and Liability Act (CERLA) long-term stewardship activities performed under the aegis of regulatory agreements, the Federal Facility Agreement and Consent Order for the Idaho National Laboratory, and state and federal requirements are administered primarily under the direction of the Idaho Cleanup Project. It represents a subset of all on-going environmental activity at the Idaho National Laboratory Site. This plan provides a listing of applicable CERCLA long-term stewardship requirements and their planned and completed implementation goals. It proffers the Long-Term Stewardship Environmental Data Warehouse for Sitewide management of environmental data. This plan will be updated as needed over time, based on input from the U.S. Department of Energy, its cognizant subcontractors, and other local and regional stakeholders.

B. E. Olaveson

2006-07-27T23:59:59.000Z

149

Department of Energy Five Year Plans, FY2007-2011 and FY2008-FY2012  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of the EM Five Year Plans was to describe EM's planned strategies, funding and accomplishments over a five year span.

150

Major accidents scenarios used for LUP and off-site emergency planning : Importance of kinetic description  

E-Print Network (OSTI)

Major accidents scenarios used for LUP and off-site emergency planning : Importance of kinetic, INERIS shows a method enabling to integrate, as a second prioritisation criteria, the on-site and off-site. Keywords : Land Use Planning ; off-site emergency planning ; chemical accident scenario ; kinetic 1

Paris-Sud XI, Université de

151

Colonie Interim Storage Site annual site environmental report for calendar year 1989, Colonie, New York  

SciTech Connect

IN 1984, Congress assigned the cleanup of the National Lead (NL) Industries site in Colonie, New York, to the Department of Energy (DOE) as part of a decontamination research and development project under the 1984 Energy and Water Appropriations Act. DOE then included the site in the Formerly Utilized Sites Remedial Action Program (FUSRAP), an existing DOE program to decontaminate or otherwise control sites where residual radioactive materials remain for the early years of the nation's atomic energy program. DOE instituted an environmental monitoring program at the site in 1984. Results are presented annually in reports such as this. Under FUSRAP, the first environmental monitoring report for this site presented data for calendar year 1984. This report presents the findings of the environmental monitoring program conducted during calendar year 1989. 16 refs., 17 figs., 14 tabs.

Not Available

1990-05-01T23:59:59.000Z

152

Hanford Site Groundwater Monitoring for Fiscal Year 2000  

SciTech Connect

This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2000 on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the central part of the Site. Hexavalent chromium is present in smaller plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath each of the reactor areas, and technetium-99 and uranium are present in the 200 Areas. RCRA groundwater monitoring continued during fiscal year 2000. Vadose zone monitoring, characterization, remediation, and several technical demonstrations were conducted in fiscal year 2000. Soil gas monitoring at the 618-11 burial ground provided a preliminary indication of the location of tritium in the vadose zone and in groundwater. Groundwater modeling efforts focused on 1) identifying and characterizing major uncertainties in the current conceptual model and 2) performing a transient inverse calibration of the existing site-wide model. Specific model applications were conducted in support of the Hanford Site carbon tetrachloride Innovative Treatment Remediation Technology; to support the performance assessment of the Immobilized Low-Activity Waste Disposal Facility; and in development of the System Assessment Capability, which is intended to predict cumulative site-wide effects from all significant Hanford Site contaminants.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2001-03-01T23:59:59.000Z

153

Draft reclamation program plan for site characterization; Yucca Mountain project  

SciTech Connect

As part of its obligations under the Nuclear Waste Policy Act, as amended, the US Department of Energy (DOE) has developed an environmental program that is to be implemented during site characterization at the Yucca Mountain site. This site is proposed for the location of the nation`s first high-level radioactive waste repository. A program for the reclamation of areas disturbed by site characterization is part of the overall environmental program for that site. This Reclamation Program Plan (RPP) describes the reclamation policy of the DOE for the Yucca Mountain site and presents an overview of the reclamation program. The RPP also provides an overview of the reclamation needs relative to site characterization; a review of legislation and requirements pertinent to reclamation; and a review of previous commitments made by the DOE to certain types of reclamation activities. The objective of the DOE reclamation program at Yucca Mountain is to return land disturbed by site-characterization activities to a stable ecological state with a form and productivity similar to the predisturbance state. The DOE will take all reasonable and necessary steps to achieve this objective. 19 refs., 2 tabs.

NONE

1989-08-01T23:59:59.000Z

154

Configuration management program plan for Hanford site systems engineering  

SciTech Connect

This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

Hoffman, A.G.

1994-11-14T23:59:59.000Z

155

Hanford Surplus Facilities Program plan, Fiscal year 1991  

SciTech Connect

The Hanford Surplus Facilities Program is responsible for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The management of these facilities requires a surveillance and maintenance program to keep them in a safe condition and development of a plan for ultimate disposition. Criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy-Richland Operations Office, Environmental Restoration Division, and are consistent with the Westinghouse Hanford Company commitment to decommission the Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities to the end of disposition. 12 refs., 2 figs., 4 tabs.

Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

1990-09-01T23:59:59.000Z

156

Site observational work plan for the UMTRA Project site at Falls City, Texas  

SciTech Connect

Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

NONE

1995-06-01T23:59:59.000Z

157

Approved Site Treatment Plan, Volumes 1 and 2. Revision 4  

SciTech Connect

The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

Helmich, E.H.; Molen, G.; Noller, D.

1996-03-22T23:59:59.000Z

158

Student Services 5 Year Plan Tim Rahilly, AVP Students  

E-Print Network (OSTI)

Student Services 5 Year Plan 2013-2018 Tim Rahilly, AVP Students 2013 #12;Revised: Nov 1, 2012 1.....................................................................................................6 Goal 1: To equip students with the knowledge, skills, and experiences that prepare them for life. Enhance the quality of education and student satisfaction

159

Master of Architecture Plan (180 credits) Year 1 (35 credits)  

E-Print Network (OSTI)

Master of Architecture Plan (180 credits) Year 1 (35 credits) Fall (16 credits) Spring (19 credits) ARCH 108 Arch. Foundations I (4) ARCH 109 Arch. Foundations II (6) ARCH 103 Intro. to Architecture (3 626 Construction Systems & Assemblies (3) ARCH 530 Environmental Systems I (3) ARCH 541 Global History

160

Hanford Site Environmental Surveillance Data Report for Calendar Year 2007  

SciTech Connect

Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2007" (PNNL-17603), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

Bisping, Lynn E.

2008-10-13T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Hanford Site Environmental Surveillance Data Report for Calendar Year 2008  

SciTech Connect

Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2008" (PNNL-18427), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

Bisping, Lynn E.

2009-08-11T23:59:59.000Z

162

Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996  

SciTech Connect

As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

Naidu, J.R.; Paquette, D.; Lee, R. [and others

1996-10-01T23:59:59.000Z

163

Second site-wide five-year review of cleanup at DOE�s Idaho site  

NLE Websites -- All DOE Office Websites (Extended Search)

NEWS MEDIA CONTACT: Danielle Miller (DOE-ID) 208-526-5709 FOR IMMEDIATE RELEASE: Thursday, February 3, 2011 Second site-wide five-year review of cleanup at DOE�s Idaho site completed; report now available online An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy�s (DOE) Idaho site. �This report verifies that the performance of cleanup actions at the Idaho Site continues to be protective of human health and the environment,� said Nicole Hernandez, DOE�s project manager for the five-year review. �The findings in the report demonstrate a strong collaborative effort by CH2M-WG Idaho (CWI), DOE, the Environmental Protection Agency (EPA), and the Idaho Department of Environmental Quality

164

Site Characterization Work Plan for Gasbuggy, New Mexico  

SciTech Connect

Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities will focus on the surface/shallow subsurface sampling and modeling. Suspected potential contaminants of concern for investigative analysis at the Gasbuggy Site include total petroleum hydrocarbons (diesel- and gasoline-range), volatile organic compounds, semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and radionuclides. The results of this characterization and risk assessment will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-site disposal of contaminated waste which will be presented in a subsequent corrective action decision document.

DOE/NV

2000-12-14T23:59:59.000Z

165

Work Controls Assessment Plan Assessment Plan Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WORK CONTROLS WORK CONTROLS Assessment Plan Developed By NNSA/Nevada Site Office Facility Representative Division Performance Objective: Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed. Criteria: Work planning addresses applicable laws, codes and regulations. Work planning includes operational configuration constraints; material, tool, and manpower requirements; inter-organizational coordination; operational history; special training; safety considerations; hazards protection requirements; post-maintenance testing; quality control requirements; and other considerations as necessary. The work to be accomplished is defined by identifying the existing

166

Annual site environmental report for calendar year 1995  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1995 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. Western operates and maintains nearly 17,000 miles of transmission lines, 257 substations, and various appurtenant power facilities in fifteen central and western states. Western is also responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may be authorized in the future. There is a combined total of 55 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has over 400 facilities located in these states, this report addresses the environmental activities in all the facilities as one site.

NONE

1995-12-31T23:59:59.000Z

167

Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 1 Targetry R&D in the 5-Year Plan  

E-Print Network (OSTI)

Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 1 MCTF Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab #12;Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 2 MCTF in target solenoid · Hardware R&D (see pp. 4-9) #12;Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 3

McDonald, Kirk

168

Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan  

Energy.gov (U.S. Department of Energy (DOE))

Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan

169

Hanford Site environmental surveillance data report for calendar year 1996  

SciTech Connect

Environmental surveillance at the Hanford Site collects data that provides a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford operations. Data are also collected to monitor several chemicals and metals in Columbia River water and sediment. In addition, Hanford Site wildlife samples were also collected for metals analysis. Pacific Northwest National Laboratory publishes an annual environmental report for the Hanford Site each calendar year. The Hanford Site Environmental Report for Calendar Year 1996 describes the site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, and environmental monitoring activities and results. The report includes a summary of offsite and onsite environmental monitoring data collected during 1996 by PNNL`s Environmental Monitoring Program. Appendix A of that report contains data summaries created from river monitoring and sediment data. This volume contains the actual raw data used to create the summaries. The data volume also includes Hanford Site drinking water radiological data.

Bisping, L.E.

1997-09-01T23:59:59.000Z

170

Annual site environmental report for calendar year 1997  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. Because Western has over 400 facilities located in 15 states, this report addresses the environmental activities in all the facilities as one site. In March, 1996, Western established a team representing each of the four Regional Offices, the CRSP Customer Service Center and the Corporate Service Office to develop an Environmental Management System based on the guidelines in ISO 14001. The significant environmental projects and issues Western was involved with in 1997 are discussed in this annual site environmental report. This report is written to show the nature and effectiveness of the environmental protection program.

NONE

1997-12-31T23:59:59.000Z

171

Site study plan for Transportation, Deaf Smith County Site, Texas: Preliminary draft  

SciTech Connect

This site study plan describes transportation field studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. The studies are needed to identify and assess potential project impacts to transportation infrastructure and systems in the project vicinity and along potential transportation routes to the site across the State of Texas. The studies are also needed to locate and design project transportation facilities, and to evaluate and design impact mitigation. After identifying the transportation information requirements needed to comply with Federal, State, and local regulations and repository program requirements, the site study plan describes the study design and rationale, the field data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs for the characterization of site vicinity rail corridors and highway corridors, characterization of alternative statewide transportation routes, monitoring of site characterization effects on transportation, characterization of aircraft overflight patterns and hazardous material transportation patterns, and assessment of emergency response preparedness along alternative statewide transportation routes. 34 refs., 10 figs., 2 tabs.

Not Available

1987-06-01T23:59:59.000Z

172

Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site  

SciTech Connect

Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in Area 3 and the other is in Area 5) at the Nevada Test Site (NTS) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Operations Office (NNSA/NV). The current DOE Order governing management of radioactive waste is 435.1. Associated with DOE Order 435.1 is a Manual (DOE M 435.1-1) and Guidance (DOE G 435.1-1). The Manual and Guidance specify that preliminary closure and monitoring plans for a low-level waste (LLW) management facility be developed and initially submitted with the Performance Assessment (PA) and Composite Analysis (CA) for that facility. The Manual and Guidance, and the Disposal Authorization Statement (DAS) issued for the Area 3 RWMS further specify that the preliminary closure and monitoring plans be updated within one year following issuance of a DAS. This Integrated Closure and Monitoring Plan (ICMP) fulfills both requirements. Additional updates will be conducted every third year hereafter. This document is an integrated plan for closing and monitoring both RWMSs, and is based on guidance issued in 1999 by the DOE for developing closure plans. The plan does not follow the format suggested by the DOE guidance in order to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. The closure and monitoring plans were integrated because much of the information that would be included in individual plans is the same, and integration provides efficient presentation and program management. The ICMP identifies the regulatory requirements, describes the disposal sites and the physical environment where they are located, and defines the approach and schedule for both closing and monitoring the sites.

S. E. Rawlinson

2001-09-01T23:59:59.000Z

173

Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada  

SciTech Connect

Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

NSTec Environmental Restoration

2007-07-01T23:59:59.000Z

174

Hanford Site waste management and environmental restoration integration plan  

SciTech Connect

The Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs.

Merrick, D.L.

1990-04-30T23:59:59.000Z

175

DOE Idaho site reaches 20-year cleanup milestone  

NLE Websites -- All DOE Office Websites (Extended Search)

IDAHO FALLS, IDAHO, 83403 IDAHO FALLS, IDAHO, 83403 Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: January 19, 2012 DOE Idaho site reaches 20-year cleanup milestone IDAHO FALLS, ID- In two decades of Superfund cleanup work, the U.S. Department of Energy's Idaho site has removed hundreds of thousands of cubic yards of radioactive and hazardously contaminated soils, excavated radioactive waste buried since the 1950s, removed three nuclear reactors and hundreds of buildings, completely closed three major nuclear facilities and removed thousands of unexploded ordnance shells and fragments. Last month marked the 20-year anniversary of the signing and implementation of a cleanup agreement between DOE, the U.S. Environmental Protection Agency and the state of Idaho. In two decades, the cleanup agreement known

176

Hanford Site environmental data for calendar year 1990 -- Ground water  

SciTech Connect

This report tabulates ground-water radiological and chemical data for calendar year 1990 by the Ground-Water Surveillance Project, reported Resource Conservation and Recovery Act (RCRA) Monitoring, and Operational Monitoring. The Ground-Water Surveillance Project is conducted by the Pacific Northwest Laboratory and the RCRA and Operational Monitoring Projects are conducted by the Westinghouse Hanford Company. This document supplements the reports Hanford Site Ground-Water Monitoring for 1990 (Evans et al. 1992) and mental Report for Calendar Year 1990 (Woodruff and Hanf 1991). The data listings provided here were generated from the Hanford Environmental Information System database.

Dresel, P.E.; Bates, D.J.; Merz, J.K.

1993-03-01T23:59:59.000Z

177

Annual site environmental report for calendar year 1994  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1994 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site``. In 1994, Western provided power to more than 600 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas. Western is responsible for the operation and maintenance of nearly 17,000 miles of transmission lines, 271 substations, 55 hydroelectric power stations, and a coal-fired power plant.

NONE

1994-12-31T23:59:59.000Z

178

Annual site environmental report for calendar year 1993  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1993 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 States, this report addresses the environmental activities in all the facilities as one ``site``. In 1993, Western provided power to more than 600 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas.

NONE

1993-12-31T23:59:59.000Z

179

Argonne National Laboratory site environmental report for calendar year 2006.  

SciTech Connect

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2006. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; ESH /QA Oversight

2007-09-13T23:59:59.000Z

180

Argonne National Laboratory site enviromental report for calendar year 2008.  

SciTech Connect

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2008. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; Davis, T. M.; Moos, L. P.

2009-09-02T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Argonne National Laboratory site environmental report for calendar year 2007.  

SciTech Connect

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2007. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; Davis, T. M.; Moos, L. P.; ESH /QA Oversight

2008-09-09T23:59:59.000Z

182

Argonne National Laboratory Site Environmental report for calendar year 2009.  

SciTech Connect

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2009. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy (DOE) dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's (EPA) CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; Davis, T. M.; Moos, L. P.

2010-08-04T23:59:59.000Z

183

Site environmental report for calendar year 1996: Yucca Mountain site, Nye County, Nevada  

SciTech Connect

The environmental program established by the Yucca Mountain Site Characterization Office (YMSCO) has been designed and implemented to protect, maintain, and restore environmental quality, minimize potential threats to the environment and the public, and comply with environmental policies and US Department of Energy (DOE) Orders. In accordance with DOE Order 5400.1, General Environmental Protection Program (DOE, 1990a), to be superseded by DOE Order 231.1 (under review), the status of the Yucca Mountain Site Characterization Project (YMP) environmental program has been summarized in this annual Site Environmental Report (SER) to characterize performance, document compliance with environmental requirements, and highlight significant programs and efforts during calendar year 1996.

NONE

1997-11-01T23:59:59.000Z

184

NRC staff site characterization analysis of the Department of Energy`s Site Characterization Plan, Yucca Mountain Site, Nevada  

SciTech Connect

This Site Characterization Analysis (SCA) documents the NRC staff`s concerns resulting from its review of the US Department of Energy`s (DOE`s) Site Characterization Plan (SCP) for the Yucca Mountain site in southern Nevada, which is the candidate site selected for characterization as the nation`s first geologic repository for high-level radioactive waste. DOE`s SCP explains how DOE plans to obtain the information necessary to determine the suitability of the Yucca Mountain site for a repository. NRC`s specific objections related to the SCP, and major comments and recommendations on the various parts of DOE`s program, are presented in SCA Section 2, Director`s Comments and Recommendations. Section 3 contains summaries of the NRC staff`s concerns for each specific program, and Section 4 contains NRC staff point papers which set forth in greater detail particular staff concerns regarding DOE`s program. Appendix A presents NRC staff evaluations of those NRC staff Consultation Draft SCP concerns that NRC considers resolved on the basis of the SCP. This SCA fulfills NRC`s responsibilities with respect to DOE`s SCP as specified by the Nuclear Waste Policy Act (NWPA) and 10 CFR 60.18. 192 refs., 2 tabs.

NONE

1989-08-01T23:59:59.000Z

185

Hanford Site Groundwater Monitoring for Fiscal Year 2003  

SciTech Connect

This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2003 (October 2002 through September 2003) on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes in groundwater are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. The largest portions of these plumes are migrating from the central Hanford Site to the southeast, toward the Columbia River. Concentrations of tritium, nitrate, and some other contaminants continued to exceed drinking water standards in groundwater discharging to the river in some locations. However, contaminant concentrations in river water remained low and were far below standards. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the central part of the Hanford Site. Hexavalent chromium is present in smaller plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath all but one of the reactor areas, and technetium-99 and uranium are present in the 200 Areas. Uranium exceeds standards in the 300 Area in the south part of the Hanford Site. Minor contaminant plumes with concentrations greater than standards include carbon-14, cesium-137, cis-1,2-dichloroethene, cyanide, fluoride, plutonium, and trichloroethene. Monitoring for the ''Comprehensive Environmental Response, Compensation, and Liability Act'' is conducted in 11 groundwater operable units. The purpose of this monitoring is to define and track plumes and to monitor the effectiveness of interim remedial actions. Interim groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100-K, 100-D, and 100-H) and strontium-90 (100-N) reaching the Columbia River. The objective of two interim remediation systems in the 200 West Area is to prevent the spread of carbon tetrachloride and technetium-99/uranium plumes. ''Resource Conservation and Recovery Act'' groundwater monitoring continued at 24 waste management areas during fiscal year 2003: 15 under interim or final status detection programs and data indicate that they are not adversely affecting groundwater; 7 under interim status groundwater quality assessment programs to assess contamination; and 2 under final status corrective-action programs. During calendar year 2003, drillers completed seven new RCRA monitoring wells, nine wells for CERCLA, and two wells for research on chromate bioremediation. Vadose zone monitoring, characterization, and remediation continued in fiscal year 2003. Remediation and associated monitoring continued at a soil-vapor extraction system in the 200 West Area, which removes gaseous carbon tetrachloride from the vadose zone. Soil vapor also was sampled to locate carbon tetrachloride sites with the potential to impact groundwater in the future. DOE uses geophysical methods to monitor potential movement of contamination beneath single-shell tank farms. During fiscal year 2003, DOE monitored selected boreholes within each of the 12 single-shell tank farms. In general, the contaminated areas appeared to be stable over time. DOE drilled new boreholes at the T Tank Farm to characterize subsurface contamination near former leak sites. The System Assessment Capability is a set of computer modules simulating movement of contaminants from waste sites through the vadose zone and groundwater. In fiscal year 2003, it was updated with the addition of an atmospheric transport module and with newer versions of models including an updated groundwater flow and transport model.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2004-04-12T23:59:59.000Z

186

Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft  

SciTech Connect

The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs.

NONE

1988-01-01T23:59:59.000Z

187

Consultation draft: Site characterization plan overview, Deaf Smith County Site, Texas: Nuclear Waste Policy Act (Section 113)  

SciTech Connect

The Department of Energy (DOE) is preparing a site characterization plan for the candidate site in Deaf Smith County, Texas. The DOE has provided, for information and review, a consultation draft of the plan to the State of Texas and the US Nuclear Regulatory Commission. The site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site characterization plan; it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the repository system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Deaf Smith County site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 15 figs., 1 tab.

Not Available

1988-01-01T23:59:59.000Z

188

DNFSB Recommendation 94-1 Hanford site integrated stabilization management plan, volumes 1 and 2  

SciTech Connect

This document comprises the Hanford Site Integrated Stabilization Management Plan (SISMP). This document describes the DOE`s plans at the Hanford Site to address concerns identified in Defense Nuclear Facilites Safety Board (DNFSB) Recommendation 94-1. This document also identifies plans for other spent nuclear fuel (SNF) inventories at the Hanford Site which are not within the scope of DNFSB Recommendation 94-1 for reference purposes because of their interrelationship with plans for SNF within the scope of DNFSB Recommendation 94-1. The SISMP was also developed to assist DOE in initial formulation of the Research and Development Plan and the Integrated Facilities Plan.

Gerber, E.W.

1996-03-15T23:59:59.000Z

189

Hanford Site groundwater monitoring for fiscal year 1996  

SciTech Connect

This report presents the results of groundwater and vadose-zone monitoring for fiscal year (FY) 1996 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiological and chemical waste that affected groundwater quality on the site. Characterization and monitoring of the vadose zone during FY 1996 comprised primarily spectral gamma logging, soil-gas monitoring, and electrical resistivity tomography. Water-level monitoring was performed to evaluate groundwater-flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Water levels over most of the Hanford Site continued to decline between June 1995 and June 1996. Groundwater chemistry was monitored to track the extent of contamination, to note trends, and to identify emerging groundwater-quality problems. The most widespread radiological contaminant plumes were tritium and iodine-129. Smaller plumes of strontium-90, technetium-99, and plutonium also were present at levels above the U.S. Environmental Protection Agency or State of Washington interim drinking water standards. Uranium concentrations greater than the proposed drinking water standard were also observed. Nitrate, fluoride, chromium, carbon tetrachloride, chloroform, trichloroethylene, and cis-1,2-dichlomethylene were present in groundwater samples at levels above their U.S. Environmental Protection Agency or State of Washington maximum contaminant levels. The nitrate plume is the most extensive. Three-dimensional, numerical, groundwater models were applied to the Hanford Site to predict contaminant-flow paths and the impact of operational changes on site groundwater conditions. Other models were applied to assess the performance of three separate pump-and-treat systems.

Hartman, M.J.; Dresel, P.E.; Borghese, J.V. [eds.] [and others] [eds.; and others

1997-02-01T23:59:59.000Z

190

Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002  

SciTech Connect

The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED).

Washington Regulatory and Environmental Services

2003-09-17T23:59:59.000Z

191

Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)  

SciTech Connect

Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

2002-01-14T23:59:59.000Z

192

Site Characterization Work Plan for Gnome-Coach Site, New Mexico  

SciTech Connect

Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

DOE/NV

2001-02-13T23:59:59.000Z

193

Hanford Site Groundwater Monitoring for Fiscal Year 1999  

SciTech Connect

This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 1999 on the US. Department of Energy's Hanford Site, Washington. Water-level monitoring was performed to evaluate groundwater flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Measurements for site-wide maps were conducted in June in past years and are now measured in March to reflect conditions that are closer to average. Water levels over most of the Hanford Site continued to decline between June 1998 and March 1999. The most widespread radiological contaminant plumes in groundwater were tritium and iodine-129. Concentrations of carbon-14, strontium-90, technetium-99, and uranium also exceeded drinking water standards in smaller plumes. Cesium-137 and plutonium exceeded standards only near the 216-B-5 injection well. Derived concentration guide levels specified in US Department of Energy Order 5400.5 were exceeded for plutonium, strontium-90, tritium, and uranium in small plumes or single wells. Nitrate and carbon tetrachloride are the most extensive chemical contaminants. Chloroform, chromium, cis-1,2dichloroethylene, cyanide, fluoride, and trichloroethylene also were present in smaller areas at levels above their maximum contaminant levels. Metals such as aluminum, cadmium, iron, manganese, and nickel exceeded their maximum contaminant levels in filtered samples from numerous wells; however, in most cases, they are believed to represent natural components of groundwater. ''Resource Conservation and Recovery Act of 1976'' groundwater monitoring continued at 25 waste management areas during fiscal year 1999: 16 under detection programs and data indicate that they are not adversely affecting groundwater; 6 under interim status groundwater quality assessment programs to assess contamination; and 2 under final status corrective-action programs. Another site, the 120-D-1 ponds, was clean closed in fiscal year 1999, and monitoring is no longer required. Groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100 K, D, and H) and strontium-90 (100 N) reaching the Columbia River. The objective of two remediation systems in the 200 West Area is to prevent the spread of carbon tetrachloride and technetium-99/uranium plumes. Groundwater monitoring continued at these sites and at other sites where there is no active remediation. Subsurface source characterization and vadose zone monitoring, soil-vapor monitoring, sediment sampling and characterization, and vadose zone remediation were conducted in fiscal year 1999. Baseline spectral gamma-ray logging at two single-shell tank farms was completed, and logging of zones at tank farms with the highest count rate was initiated. Spectral gamma-ray logging also occurred at specific retention facilities in the 200 East Area. These facilities are some of the most significant potential sources of remaining vadose zone contamination. Finally, remediation and monitoring of carbon tetradoride in the 200 West Area continued, with an additional 972 kilograms of carbon tetrachloride removed from the vadose zone in fiscal year 1999.

MJ Hartman; LF Morasch; WD Webber

2000-05-10T23:59:59.000Z

194

St. Louis Airport Site annual site environmental report. Calendar year 1985  

SciTech Connect

During 1985, the environmental monitoring program was continued at the St. Louis Airport Site (SLAPS) in St. Louis County, Missouri. The ditches north and south of the site have been designated for cleanup as part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a United States Department of Energy (DOE) program to identify, decontaminate, or otherwise control sites where low-level radioactive contamination remains from the early years of the nation's atomic energy program. The site is not currently controlled or regulated by DOE or NRC, although radiological monitoring of the site has been authorized by the DOE. The monitoring program at the SLAPS measures radon gas concentrations in air; external gamma radiation dose rates; and uranium, thorium, and radium concentrations in surface water, groundwater, and sediment. Potential radiation doses to the public are also calculated. Because the site is not controlled or regulated by the DOE, the DOE Derived Concentration Guides (DCGs) are not applicable to SLAPS, but are included as a basis for comparison only. The DOE DCGs and the DOE radiation protection standard have been revised.

Not Available

1986-04-01T23:59:59.000Z

195

Hanford Site Environmental Surveillance Data Report for Calendar Year 2005  

SciTech Connect

This data report contains the actual raw data used to create the tables and summaries in the Hanford Site Environmental Report for Calendar Year 2005. In addition to providing raw data collected during routine sampling efforts in 2005, this data report also includes Columbia River shoreline spring data collected by the PNNL Groundwater Performance Assessment Project, and data from collaborative studies performed by the PNNL during 2005 under partial support by the SESP. Some analytical results were not received in time to include in this report or changes may have occurred to the data following publication.

Bisping, Lynn E.

2006-09-28T23:59:59.000Z

196

Annual Site Environmental Report for Calendar Years 2009 to 2010  

SciTech Connect

This report presents the results of environmental activities and monitoring programs at the Princeton Plasma Physics Laboratory (PPPL) for Calendar Years 2009-2010. The report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are released into the environment as a result of PPPL operations. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2009-2010. The objective of the Site Environmental Report is to document PPPL's efforts to protect the public's health and the environment through its environmental protection, safety, and health programs. __________________________________________________

Virginia Finley

2012-08-08T23:59:59.000Z

197

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network (OSTI)

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Park-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Park Management ­ Bachelor of Science [EH

Sheridan, Scott

198

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network (OSTI)

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Recreation-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Recreation Management ­ Bachelor

Sheridan, Scott

199

SSL R&D Multi-Year Program Plan | Department of Energy  

Energy Savers (EERE)

DOE Solid-State Lighting Research and Development Multi-Year Program Plan. sslmypp2013web.pdf More Documents & Publications Solid-State Lighting R&D Multi-Year Program Plan...

200

DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OE National SCADA Test Bed Fiscal Year 2009 Work Plan DOEOE National SCADA Test Bed Fiscal Year 2009 Work Plan This document is designed to help guide and strengthen the DOEOE...

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Site environmental report for calendar year 1997, Yucca Mountain Site, Nye County, Nevada  

SciTech Connect

This document is the seventh annual Site Environmental Report (SER) submitted by the Yucca Mountain Site Characterization Office (YMSCO) to describe the environmental program implemented by the US Department of Energy (DOE) at Yucca Mountain. As prescribed by the Nuclear Waste Policy Act (NWPA, 1982), this program ensures that site characterization activities are conducted in a manner that minimizes any significant adverse impacts to the environment and complies with all applicable laws and regulations. The most recent guidelines for the preparation of the SER place major emphasis on liquid and gaseous emissions of radionuclides, pollutants or hazardous substances; human exposure to radionuclides; and trends observed by comparing data collected over a period of years. To date, the YMP has not been the source of any radioactive emissions or been responsible for any human exposure to radionuclides. Minuscule amounts of radioactivity detected at the site are derived from natural sources or from dust previously contaminated by nuclear tests conducted in the past at the NTS. Because data for only a few years exist for the site, identification of long-term trends is not yet possible. Despite the lack of the aforementioned categories of information requested for the SER, the YMP has collected considerable material relevant to this report. An extensive environmental monitoring and mitigation program is currently in place and is described herein. Also, as requested by the SER guidelines, an account of YMP compliance with appropriate environmental legislation is provided.

NONE

1998-10-01T23:59:59.000Z

202

Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 2  

SciTech Connect

The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site; to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. Chapter 3 summarizes present knowledge of the regional and site hydrologic systems. The purpose of the information presented is to (1) describe the hydrology based on available literature and preliminary site-exploration activities that have been or are being performed and (2) provide information to be used to develop the hydrologic aspects of the planned site characterization program. Chapter 4 contains geochemical information about the Yucca Mountain site. The chapter references plan for continued collection of geochemical data as a part of the site characterization program. Chapter 4 describes and evaluates data on the existing climate and site meterology, and outlines the suggested procedures to be used in developing and validating methods to predict future climatic variation. 534 refs., 100 figs., 72 tabs.

NONE

1988-01-01T23:59:59.000Z

203

2012 Annual Planning Summary for Nevada Site Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APS-2012-NSO.xls More Documents & Publications 2014 Annual Planning Summary for the West Valley Demonstration Project 2012 Annual Planning Summary for Loan Program Office 2012...

204

St. Louis Airport site: Annual site environmental report, Calendar Year 1986. [FUSRAP  

SciTech Connect

During 1986, the environmental monitoring program was continued at the St. Louis Airport Site (SLAPS) in St. Louis County, Missouri. The ditches north and south of the site were designated for cleanup as part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a United States Department of Energy (DOE) program to identify, decontaminate, or control sites where residual radioactive material remains from the early years of the nation's atomic energy program. The site is currently controlled by the St. Louis Airport Authority. The monitoring program measures radon gas concentrations in air; external gamma dose rates; and uranium, thorium, and radium concentrations in surface water, groundwater, and sediment. The radiation dose was calculated for the maximally exposed individual. Based on the scenario described in this report, the maximally exposed individual would receive an external exposure approximately equivalent to 4.7 percent of the DOE radiation protection standard of 100 mrem/yr. The dose to the population within an 80-km (50-mi) radius of the SLAPS that would result from radioactive materials present at the site would be indistinguishable from the dose the population would receive from naturally occurring radioactive sources. 12 refs., 5 figs., 10 tabs.

Not Available

1987-05-01T23:59:59.000Z

205

Site Sustainability Plan FY 2014 (Management Publication), NREL (National Renewable Energy Laboratory)  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Sustainability Plan FY 2014 Site Sustainability Plan FY 2014 The National Wind Technology Center has 10.2 MW of on-site wind systems. Cover photo: The new LEED Platinum Energy Systems Integration Facility is the first U.S. facility in which both the public and private sector researchers can scale-up clean energy technologies. NOMENCLATURE ........................................................................................................ II EXECUTIVE SUMMARY .............................................................................................. 1 GREENHOUSE GAS REDUCTION ........................................................................... 7 BUILDINGS, ESPC, REGIONAL AND LOCAL PLANNING .............................13 HIGH PERFORMANCE SUSTAINABLE BUILDINGS ..............................13

206

Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1  

SciTech Connect

This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan.

NONE

1994-08-31T23:59:59.000Z

207

DOE National SCADA Test Bed Program Multi-Year Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National SCADA Test Bed Program Multi-Year Plan National SCADA Test Bed Program Multi-Year Plan DOE National SCADA Test Bed Program Multi-Year Plan This document presents the National SCADA Test Bed Program Multi-Year Plan, a coherent strategy for improving the cyber security of control systems in the energy sector. The NSTB Program is conducted within DOE's Office of Electricity Delivery and Energy Reliability (OE), which leads national efforts to modernize the electric grid, enhance the security and reliability of the energy infrastructure, and facilitate recovery from disruptions to the energy supply. The Plan covers the planning period of fiscal year 2008 to 2013. DOE National SCADA Test Bed Program Multi-Year Plan More Documents & Publications DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan

208

Hazelwood Interim Storage Site environmental surveillance report for calendar year 1993  

SciTech Connect

This report summarizes the results of environmental surveillance activities conducted at the Hazelwood Interim Storage Site (HISS) during calendar year 1993. It includes an overview of site operations, the basis for monitoring for radioactive and non-radioactive parameters, summaries of environmental program at HISS, a summary of the results, and the calculated hypothetical radiation dose to the offsite population. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. The US Department of Energy (DOE) began environmental monitoring of HISS in 1984, when the site was assigned to DOE by Congress through the energy and Water Development Appropriations Act and subsequent to DOE`s Formerly Utilized Sites Remediation Action Program (FUSRAP). Contamination at HISS originated from uranium processing work conducted at Mallinckrodt Chemical Works at the St. Louis Downtown Site (SLDS) from 1942 through 1957.

Not Available

1994-06-01T23:59:59.000Z

209

Safer Work Plan for CAUs 452, 454, 456, and 464 Closure of Historical UST Release Sites Nevada Test Site  

SciTech Connect

This plan addresses characterization and closure of nine underground storage tank petroleum hydrocarbon release sites. The sites are located at the Nevada Test Site in Areas 2, 9, 12, 23, and 25. The underground storage tanks associated with the release sites and addressed by this plan were closed between 1990 and 1996 by the U. S. Department of Energy, Nevada Operations Office. One underground storage tank was closed in place (23-111-1) while the remaining eight were closed by removal. Hydrocarbon releases were identified at each of the sites based upon laboratory analytical data samples collected below the tank bottoms. The objective of this plan is to provide a method for implementing characterization and closure of historical underground storage tank hydrocarbon release sites.

Jerry Bonn

1997-08-01T23:59:59.000Z

210

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 3.0 Technical Plan  

Energy.gov (U.S. Department of Energy (DOE))

Technical Plan section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated May 2012. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

211

EM-21 Multi-Year Program Plan Prioritization Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 24, 2008 July 24, 2008 EM-21 Multi-Year Program Plan Prioritization Process A presentation to the Department of Energy High Level Waste Corporate Board 2 Topics to be Covered ¡ Initiative Development Team approach and structure ¡ Goals ¡ Background on prioritization process ¡ Lessons Learned from FY 2008 ¡ Prioritization Process l Overview l Criteria l Task Development and Selection l Current status l Process output ¡ Program Management 3 Waste Processing Programs Initiative Development Team Structure Waste Processing Programs (WBS 1.0) Steve Krahn (EM-21) Texas Chee (EM-21) Lead - Jeff Griffin (SRNL) Deputy - Paul Bredt (PNNL) Jay Roach (INL) Ben Lewis (ORNL) Blue - EM-20 Green - SRNL Red - INL Purple - PNNL Brown - ORNL Black - Other Affiliated Institutions Legend: Personnel: Improved Waste Storage

212

1992 Resource Program, 10 Year Plan : Draft II.  

SciTech Connect

The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

213

1992 Resource Program, 10 Year Plan : Draft II.  

SciTech Connect

The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

214

Multi-Year Program Plan, Building Regulatory Programs: 2010-2015  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Multi-Year Program Plan Multi-Year Program Plan - Building Regulatory Programs - U.S. Department of Energy - Energy Efficiency and Renewable Energy - Building Technologies Program - October 2010 [This plan will be updated based on actual appropriations, future budget requests and other program developments; the next significant revision is expected to be completed by spring 2011] 1 Building Regulatory Programs Multi Year Program Plan � Contents 1. Executive Summary ...................................................................................................................................................... 7 - 2. Introduction ...................................................................................................................................................................14

215

Project plans for transuranic waste at small quantity sites in the Department of Energy comples-10522  

SciTech Connect

Los Alamos National Laboratory, Carlsbad Office (LANL-CO), has been tasked to write Project Plans for all of the Small Quantity Sites (SQS) with defense related Transuranic (TRU) waste in the Department of Energy (DOE) complex. Transuranic Work-Off Plans were precursors to the Project Plans. LANL-CO prepared a Work-Off Plan for each small quantity site. The Work-Off Plan that identified issues, drivers, schedules, and inventory. Eight sites have been chosen to deinventory their legacy TRU waste; Bettis Atomic Power Laboratory, General Electric-Vallecitos Nuclear Center, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory-Area 300, Nevada Test Site, Nuclear Radiation Development, Sandia National Laboratory, and the Separations Process Research Unit. Each plan was written for contact and/or remote handled waste if present at the site. These project plans will assist the small quantity sites to ship legacy TRU waste offsite and de-inventory the site of legacy TRU waste. The DOE is working very diligently to reduce the nuclear foot print in the United States. Each of the eight SQSs will be de-inventoried of legacy TRU waste during a campaign that ends September 2011. The small quantity sites have a fraction of the waste that large quantity sites possess. During this campaign, the small quantity sites will package all of the legacy TRU waste and ship to Idaho or directly to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The sites will then be removed from the Transuranic Waste Inventory if they are de-inventoried of all waste. Each Project Plan includes the respective site inventory report, schedules, resources, drivers and any issues. These project plans have been written by the difficult waste team and will be approved by each site. Team members have been assigned to each site to write site specific project plans. Once the project plans have been written, the difficult team members will visit the sites to ensure nothing has been overlooked and to verify the inventory. After each site has approved their project plan, the site will begin writing procedures and packaging/repackaging their waste. In some cases the sites have already begun the process. The waste will be shipped after all of the waste has been characterized and approved.

Mctaggart, Jerri Lynne [Los Alamos National Laboratory; Lott, Sheila [Los Alamos National Laboratory; Gadbury, Casey [DOE

2009-01-01T23:59:59.000Z

216

Background Information for the Nevada National Security Site Integrated Sampling Plan, Revision 0  

SciTech Connect

This document describes the process followed to develop the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan). It provides the Plans purpose and objectives, and briefly describes the Underground Test Area (UGTA) Activity, including the conceptual model and regulatory requirements as they pertain to groundwater sampling. Background information on other NNSS groundwater monitoring programsthe Routine Radiological Environmental Monitoring Plan (RREMP) and Community Environmental Monitoring Program (CEMP)and their integration with the Plan are presented. Descriptions of the evaluations, comments, and responses of two Sampling Plan topical committees are also included.

Farnham, Irene; Marutzky, Sam

2014-12-01T23:59:59.000Z

217

Niagara Falls Storage Site environmental surveillance report for calendar year 1993  

SciTech Connect

This report summarizes the results of environmental surveillance activities conducted at the Niagara Falls Storage Site (NFSS) during calendar year 1993. It includes an overview of site operations, the basis for radiological and nonradiological monitoring, a summary of the results, and the estimated dose to the offsite population. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. NFSS is in compliance with National Emission Standards for Hazardous Air Pollutants (NESHAPs) Subpart H of the Clean Air Act as well as the requirements of the National Pollutant Discharge Elimination System (NPDES) under the Clean Water Act. Located in northwestern New York, the site covers 191 acres. From 1944 to the present, the primary use of NFSS has been storage of radioactive residues that were by-products of uranium production. Most onsite areas of residual radioactivity above regulatory guidelines were remediated during the early 1980s. Additional isolated areas of onsite contamination were remediated in 1989, and the materials were consolidated into the waste containment structure in 1991. Remediation of the site has now been completed.

Not Available

1994-06-01T23:59:59.000Z

218

West Valley Demonstration Project Site Environmental Report Calendar Year 2000  

SciTech Connect

The annual site environmental monitoring report for the West Valley Demonstration Project nuclear waste management facility.

NONE

2001-08-31T23:59:59.000Z

219

Hanford Site Groundwater Monitoring for Fiscal Year 1998  

SciTech Connect

This report presents the results of groundwater and vadose-zone monitoring and remediation for fiscal year (FY) 1998 on the Word Site, Washington. Soil-vapor extraction in the 200-West Area removed 777 kg of carbon tetrachloride in FY 1998, for a total of 75,490 kg removed since remediation began in 1992. Spectral gamma logging and evaluation of historical gross gamma logs near tank farms and liquid-disposal sites in the 200 Areas provided information on movement of contaminants in the vadose zone. Water-level monitoring was performed to evaluate groundwater-flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Water levels over most of the Hanford Site continued to decline between June 1997 and June 1998. The most widespread radiological contaminant plumes in groundwater were tritium and iodine-129. Concentrations of technetium-99, uranium, strontium-90, and carbon-14 also exceeded drinking water standards in smaller plumes. Plutonium and cesium-137 exceeded standards only near the 216-B-5 injection well. Derived concentration guide levels specified in U.S. Department of Energy Order 5400.5 were exceeded for tritium, uranium, strontium-90, and plutonium in small plumes or single wells. One well completed in the basalt-confined aquifer beneath the 200-East Area exceeded the drinking water standard for technetium-99. Nitrate is the most extensive chemical contaminant. Carbon tetrachloride, chloroform, chromium, cis-l, Z-dichloroethylene, fluoride, and trichloroethylene also were present in smaller areas at levels above their maximum contaminant levels. Cyanide concentrations were elevated in one area but were below the maximum contaminant level. Tetrachloroethylene exceeded its maximum contaminant level in several wells in the 300 Area for the first time since the 1980s. Metals such as aluminum, cadmium, iron, manganese, and nickel exceeded their maximum contaminant levels in filtered samples from numerous wells; they are believed to represent natural components of groundwater. Resource Conservation and Recovery Act of 1976 groundwater monitoring continued at 25 waste management areas during FY 1998: 17 under detection programs and data indicate that they are not adversely affecting groundwater, 6 under interim-status groundwater-quality-assessment programs to assess possible contamination, and 2 under final-status corrective-action programs. Groundwater remediation in the 100 Areas continued to reduce the amount of strontium-90 (100-N) and chromium (100-K, D, and H) reaching the Columbia River. Two systems in the 200-West Area operated to prevent the spread of carbon tetrachloride and technetide uranium plumes. Groundwater monitoring continued at these sites and at other sites where there is no active remediation. A three-dimensional, numerical groundwater model was applied to simulate radionuclide movement from sources in the 200 Areas following site closure in 2050. Contaminants will continue to move toward the southeast and north (through Gable Gap), but the areas with levels exceeding drinking water standards will diminish.

Hartman, M.J. [and others

1999-03-24T23:59:59.000Z

220

Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site  

SciTech Connect

This document is an integrated plan for closing and monitoring two low-level radioactive waste disposal sites at the Nevada Test Site.

Bechtel Nevada

2005-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Its that time of year again: Performance Plans!  

Energy.gov (U.S. Department of Energy (DOE))

Listed below are some great tools to assist employees, supervisors and managers with measuring and writing performance plans.

222

Geothermal Energy Multi-Year Program Plan, FY 1993-1997  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form. (DJE 2005)

None

1992-03-01T23:59:59.000Z

223

Nevada Test Site site treatment plan, final annual update. Revision 1  

SciTech Connect

A Site Treatment Plan (STP) is required for facilities at which the US Department of Energy Nevada Operations Office (DOE/NV) generates or stores mixed waste (MW), defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act (RCRA) and a radioactive material subject to the Atomic Energy Act. This STP was written to identify specific treatment facilities for treating DOE/NV generated MW and provides proposed implementation schedules. This STP was approved by the Nevada Division of Environmental Protection (NDEP) and provided the basis for the negotiation and issuance of the FFCAct Consent Order (CO) dated March 6, 1996. The FFCAct CO sets forth stringent regulatory requirements to comply with the implementation of the STP.

NONE

1998-04-01T23:59:59.000Z

224

Compendium of Data for the Hanford Site (Fiscal Years 2004 to 2008) Applicable to Estimation of Recharge Rates  

SciTech Connect

This report is a compendium of recharge data collected in Fiscal Years 2004 through 2008 at various soil and surface covers found and planned in the 200 West and 200 East Areas of the U.S. Department of Energys Hanford Site in southeast Washington State. The addition of these new data to previously published recharge data will support improved estimates of recharge with respect to location and soil cover helpful to evaluations and risk assessments of radioactive and chemical wastes at this site. Also presented are evaluations of the associated uncertainties, limitations, and data gaps in the existing knowledge base for recharge at the Hanford Site.

Nichols, William E.; Rockhold, Mark L.; Downs, Janelle L.

2008-09-24T23:59:59.000Z

225

Development of standard evaluation plan for survey and investigation of residual radioactivity on site  

Science Journals Connector (OSTI)

......standard evaluation plan for survey and investigation...site investigation plan are needed to ensure...under their control. Regulatory agencies need to...historical records review, process knowledge...Office of Nuclear Regulatory Research. NUREG-1640...standard evaluation plan for survey and investigation......

Sang Won Shin; Joo Ho Whang; Su Hong Lee; Jea Min Lee

2011-07-01T23:59:59.000Z

226

Oak Ridge Reservation site management plan for the environmental restoration program  

SciTech Connect

This report describes the overall approach for addressing environmental contamination on the Oak Ridge Reservation (ORR) National Priorities List site located in east Tennessee. The cleanup strategy reflected in this site management plan (SMP) has been developed to accelerate the transition of areas of concern (AOCs) from characterization to remediation by making decisions at the watershed scale based on recommended land uses. Project scoping involves the use of defined remedial action objectives, which are based in part on the land uses selected for the project sites. To provide a consistent land use approach that accommodates the needs of all stakeholders responsible for the remediation and reutilization of the ORR, a reservation-wide strategy has been developed. The Common Ground process is a stakeholder-driven process to determine preferred land use options for the ORR so that clean-up operations will be based on the most likely and acceptable land uses. DOE utilized the information gathered in the Common Ground process to recommend desired land uses for the ORR. The land uses recommended by DOE as a result of the Common Ground process are being used for planning land and facility use/reuse for the next 25 years. Land uses recommended for the ORR in conducting CERCLA remedial activities are conservation, industrial use, and waste management.

NONE

1995-09-01T23:59:59.000Z

227

Hanford Site groundwater monitoring for Fiscal Year 1997  

SciTech Connect

This report presents the results of groundwater and vadose-zone monitoring for fiscal year (FY) 1997 on the Hanford Site, Washington. Soil-vapor extraction continued in the 200-West Area to remove carbon tetrachloride from the vadose zone. Characterization and monitoring of the vadose zone comprised primarily spectral gamma logging, soil-vapor monitoring, and analysis and characterization of sediments sampled below a vadose-zone monitoring well. Source-term analyses for strontium-90 in 100-N Area vadose-zone sediments were performed using recent groundwater-monitoring data and knowledge of strontium`s ion-exchange properties. Water-level monitoring was performed to evaluate groundwater-flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Water levels over most of the Hanford Site continued to decline between June 1996 and June 1997. Water levels near the Columbia River increased during this period because the river stage was unusually high. Groundwater chemistry was monitored to track the extent of contamination, to note trends, and to identify emerging groundwater-quality problems. The most widespread radiological contaminant plumes were tritium and iodine-129. Concentrations of technetium-99, uranium, strontium-90, and carbon-14 also exceeded drinking water standards in smaller plumes. Plutonium and cesium-137 exceeded standards only near the 216-B-5 injection well. Derived concentration guide levels specified in U.S. Department of Energy Order 5400.5 were exceeded for tritium, uranium, strontium-90, and plutonium in small plumes or single wells. Nitrate is the most extensive chemical contaminant. Carbon tetrachloride, chloroform, chromium, cis-1,2-dichloroethylene, fluoride, and trichloroethylene also were present in smaller areas at levels above their maximum contaminant levels. Cyanide concentrations were elevated in one area but were below the maximum contaminant level.

Hartman, M.J.; Dresel, P.E. [eds.] [and others] [eds.; and others

1998-02-01T23:59:59.000Z

228

Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 1  

SciTech Connect

The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in acordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and eveloping a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing prinicples, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed. 880 refs., 130 figs., 25 tabs.

NONE

1988-01-01T23:59:59.000Z

229

Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 4  

SciTech Connect

The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended and approved by the President for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site; to describe the conceptual designs for the repository and the waste package; and to present the plans for obtaining the geologic information necessary to demonstate the suitability of the site for a repository, to desin the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next; it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed.

NONE

1988-01-01T23:59:59.000Z

230

Rocky Flats Environmental Technology Site Treatment Plan Compliance Order, October 3, 1995 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order Requiring Compliance with Site Treatment Plan Order Requiring Compliance with Site Treatment Plan No. 95-10-03-01 State Colorado Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Approve with modifications the Proposed Site Treatment Plan for RFETS (MLLW); establish a Mixed Transuranic waste Agreement Parties DOE; Colorado Department of Public Health and Environment (CDPHE) Date 10/3/1995 SCOPE * In regard to Mixed Low-Level waste, approve with modifications the Proposed Site Treatment Plan for RFETS and require compliance by DOE with the modified and approved Site Treatment Plan. * In regard to Mixed Transuranic waste, establish and ensure compliance with an Agreement addressing compliance with the Hazardous and Solid Waste Amendments of 1984 to RCRA. ESTABLISHING MILESTONES

231

Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Table of Contents  

Energy.gov (U.S. Department of Energy (DOE))

The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

232

Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Benefits  

Energy.gov (U.S. Department of Energy (DOE))

The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

233

Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan  

Energy.gov (U.S. Department of Energy (DOE))

The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

234

Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect

Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): 05-23-02, GMX Alpha Contaminated Area 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

Matthews, Patrick

2014-05-01T23:59:59.000Z

235

Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 1, Part A: Chapters 1 and 2  

SciTech Connect

This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 750 refs., 123 figs., 42 tabs.

NONE

1988-12-01T23:59:59.000Z

236

Site Characterization Plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 3, Part A: Chapters 6 and 7  

SciTech Connect

This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 218 figs., 50 tabs.

NONE

1988-12-01T23:59:59.000Z

237

Hanford Site Rare Plant Monitoring Report for Calendar Year 2012  

SciTech Connect

Two patches of Columbian yellowcress on the Hanford Reach were visited in both 2011 and 2012 to compare ramet counts between years: near Allerd Pumphouse (Rkm 615.4) and near White Bluffs Boat Launch (Rkm 593.3) (Figure 3). In 2012, the population near Allerd Pumphouse had 45 ramets present within a 5x3 m area. At the same population in 2011, there were 60 ramets. In 2012, the population near White Bluffs Boat Launch had 105 ramets in a 2x2 m area. At the same population in 2011, there were 100 ramets. This data shows that while annual variability does exist, ramet counts were relatively similar from 2011 to 2012. This is likely due to the similar flow regimes of 2011 and 2012, which both had above average snowpack, high flows, and extended spring flooding seasons. A total of 19.6 miles (31.5 km) of the Hanford shoreline were surveyed in 2012, with ten patches identified and approximately 1,250 ramets counted. It is not known how many individual plants this count represents due to the rhizomatous nature of the species. Two of these sites were identified previously in the WNHP database, and the remaining eight were newly identified locations. Eleven of the ramets had flowers and/or buds in the patches located during 2012, but no fruits were found

Salstrom, D; Easterly, R; Lindsey, Cole T.; Nugent, John J.

2013-03-21T23:59:59.000Z

238

Site Visit Report - Independent Oversight Review of Work Planning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

representatives participate in daily work planning meetings; and instituting Conduct of Operations training for front line managers and Facility Managers. PRS also began...

239

Hanford Site Environmental Report for Calendar Year 2007  

SciTech Connect

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights signifi cant environmental and public protection programs and efforts. Some historical and early 2008 information is included where appropriate.

Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

2008-06-05T23:59:59.000Z

240

Hanford Site Environmental Report for Calendar Year 2008  

SciTech Connect

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2009 information is included where appropriate.

Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

2009-09-15T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Hanford Site Environmental Report for Calendar Year 2009  

SciTech Connect

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2010 information is included where appropriate.

Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

2010-09-01T23:59:59.000Z

242

DOE OIG Strategic Plan Fiscal Years 2014- 2019  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Inspector Generals plan to strengthen the integrity, economy, and efficiency of the Departments programs and operations.

243

Savannah River Site Land Use Plan - May, 2013 i SRNS-RP-2013-00162  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River Site Land Use Plan - May, 2013 i Savannah River Site Land Use Plan - May, 2013 i SRNS-RP-2013-00162 Savannah River Site Land Use Plan - May, 2013 i Table of Contents 1.0 - Purpose p1 2.0 - Executive Summary p1 3.0 - SRS Land Use Overview p5 Assumptions Current Land Use Leases, Transfers and Other Land Use Actions Future Land Use Land Use Issues 4.0 - Land Use Planning and Control for Existing Missions p13 Cleanup, Production and Support Missions Natural and Cultural Resource Management 5.0 - Process for Future Land Use Changes p15 Introduction Process Overview Process Description 6.0 - Summary p19 7.0 - References p20 8.0 - Acronyms p21 Savannah River Site Land Use Plan - May, 2013 i

244

FTCP OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 FTCP OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2010 Operational Plan FY2010 Operational Plan - Goal 1 Summary FY2010 Operational Plan - Goal 2 Summary FY2010 Operational Plan - Goal 3 Summary

245

SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.  

SciTech Connect

The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

Larsen, Barbara L.

2005-05-01T23:59:59.000Z

246

2013 Annual Planning Summary for the Ames Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within theAmes Site Office.

247

2011 Annual Planning Summary for Livermore Site Office (LSO)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Livermore Site Office (LSO).

248

2013 Annual Planning Summary for the Argonne Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within theArgonne Site Office

249

2012 Annual Planning Summary for Livermore Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the Livermore Site Office.

250

2012 Annual Planning Summary for Thomas Jefferson Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Thomas Jefferson Site Office.

251

2013 Annual Planning Summary for the Princeton Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Princeton Site Office.

252

2011 Annual Planning Summary for Princeton Site Office (PSO)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Princeton Site Office (PSO).

253

2014 Annual Planning Summary for the Princeton Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Princeton Site Office.

254

2012 Annual Planning Summary for Princeton Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Princeton Site Office.

255

2012 Annual Planning Summary for Fermi Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Fermi Site Office.

256

2013 Annual Planning Summary for the FERMI Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the FERMI Site Office.

257

DNFSB recommendation 94-1 Hanford site integrated stabilization management plan - VOLUMES 1-3  

SciTech Connect

The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE's DNFSB Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. These additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document constitutes the Hanford SISMP. This document includes the planned work scope, costs and schedules for activities at the Hanford site to implement the DNFSB Recommendation 94-1 IPP.

Gerber, E.W.

1996-09-23T23:59:59.000Z

258

Hanford Site Environmental Report for Calendar Year 2010  

SciTech Connect

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2011 information is included where appropriate.

Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

2011-07-12T23:59:59.000Z

259

Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98  

SciTech Connect

The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and the results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).

Deborah L. Layton; Kimberly Frerichs

2010-07-01T23:59:59.000Z

260

Multi-Year Program Plan, Building Regulatory Programs: 2010-2015  

Energy.gov (U.S. Department of Energy (DOE))

This Multi-Year Program Plan covers Building Regulatory Programs under the Office of Energy Efficiency and Renewable Energy, Building Technologies Program, and was published in October, 2010.

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan  

Energy.gov (U.S. Department of Energy (DOE))

Subject: Office of Inspector Generals combined Fiscal Year (FY) 2002 Annual Performance Results and FY 2003 Annual Performance Plan

262

EM Five-Year Plan (FY2008 - FY2012)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- East; Ashtabula; Brookhaven National Laboratory; Lawrence Berkeley National Laboratory; Energy Technology Engineering Center; Lawrence Livermore National Laboratory-Site 300;...

263

Superconducting Super Collider site environmental report for calendar year 1991. Pre-operational  

SciTech Connect

This is the first annual SER prepared for the SSC project. It is a pre-operational report, intended primarily to describe the baseline characterization of the Ellis County, Texas site that has been developed subsequent to the Environmental Impact Statement (EIS) and the Supplemental Environmental impact Statement (SEIS). As such, the emphasis will be on environmental compliance efforts, including monitoring and mitigation programs. The SER also reports on the measures taken to meet the commitments made in the EIS and SEIS. These measures are detailed in the Mitigation Action Plan (MAP) (Department of Energy (DOE), 1991), which was prepared following the signing of the Record of Decision (ROD) to construct the SSC in Texas. The SER will continue to be preoperational until the first high-energy (20 trillion electron volt or TeV) protons collisions are observed, at which point the SSC will become operational. At that time, the SER will place more emphasis on the radiological monitoring program. This SER will report on actions taken in 1991 or earlier and briefly mention some of those planned for calendar year 1992. AU actions completed in 1992 will be addressed in the SER for calendar year 1992.

NONE

1995-05-01T23:59:59.000Z

264

2010 Annual Planning Summary Livermore Site Office (LSO)  

Energy.gov (U.S. Department of Energy (DOE))

Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

265

HOISTING & RIGGING Assessment Plan--NNSA/Nevada Site Office Facility...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on a scheduled basis, certifying that safe operations are in compliance with good conduct of operations. DOE-STD-1090-2001 HoistingRiggingPlan.doc More Documents &...

266

2010 Annual Planning Summary for Nevada Site Office  

Energy.gov (U.S. Department of Energy (DOE))

Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

267

2011 Annual Planning Summary for Argonne Site Office (Argonne)  

Energy.gov (U.S. Department of Energy (DOE))

Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

268

Savannah River Site mixed waste Proposed Site Treatment Plan (PSTP). Volumes 1 and 2 and reference document: Revision 2  

SciTech Connect

The DOE is required by the Resource Conservation and Recovery Act to prepare site treatment plans describing the development of treatment capacities and technologies for treating mixed waste. This proposed plan contains Savannah River Site`s preferred options and schedules for constructing new facilities, and otherwise obtaining treatment for mixed wastes. The proposed plan consists of 2 volumes. Volume 1, Compliance Plan, identifies the capacity to be developed and the schedules as required. Volume 2, Background, provides a detailed discussion of the preferred options with technical basis, plus a description of the specific waste streams. Chapters are: Introduction; Methodology; Mixed low level waste streams; Mixed transuranic waste; High level waste; Future generation of mixed waste streams; Storage; Process for evaluation of disposal issues in support of the site treatment plans discussions; Treatment facilities and treatment technologies; Offsite waste streams for which SRS treatment is the Preferred Option (Naval reactor wastes); Summary information; and Acronyms and glossary. This revision does not contain the complete revised report, but only those pages that have been revised.

Helmich, E.; Noller, D.K.; Wierzbicki, K.S.; Bailey, L.L.

1995-07-13T23:59:59.000Z

269

DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1  

SciTech Connect

The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE`s Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations.

Gerber, E.W.

1995-10-01T23:59:59.000Z

270

DOE OIG Strategic Plan Fiscal Years 2003-2008  

Energy.gov (U.S. Department of Energy (DOE))

This plan represents the Office of the Inspector General's vision and strong commitment for improving the management and performance of the Department of Energys many programs and operations.

271

Federal Geothermal Program Plan for Fiscal Year 1983  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This is a report of the Interagency Geothermal Coordinating Committee (IGCC). (DJE 2005)

None

1983-03-01T23:59:59.000Z

272

Hanford Site Environmental Report for calendar year 1992  

SciTech Connect

This report is prepared annually to summarize environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations at the Hanford Site. The following sections: describe the Hanford Site and its mission; summarize the status in 1992 of compliance with environmental regulations; describe the environmental programs at the Hanford Site; discuss public dose estimates from 1992 Hanford activities; present information on effluent monitoring and environmental surveillance, including ground-water protection and monitoring, and discuss activities to ensure quality.

Woodruff, R.K.; Hanf, R.W.; Lundgren, R.E. [eds.

1993-06-01T23:59:59.000Z

273

Waste Isolation Pilot Plant site environmental report, for calendar year 1995  

SciTech Connect

The U.S. Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires DOE facilities, that conduct environmental protection programs, to annually prepare a Site Environmental Report (SER). The purpose of the SER is to provide an abstract of environmental assessments conducted in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit. The content of this SER is not restricted to a synopsis of the required data, in addition, information pertaining to new and continued monitoring and compliance activities during the 1995 calendar year are also included. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP). The EMP provides inclusive guidelines implemented to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater. air, soil, and biotic matrices are monitored for an array of radiological and nonradiological factors. The baseline radiological surveillance program encompasses a broader geographic area that includes nearby ranches, villages, and cities. Most elements of nonradiological assessments are conducted within the geographic vicinity of the WIPP site.

NONE

1996-09-01T23:59:59.000Z

274

2014 Annual Planning Summary for the Argonne Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The Argonne Site Office has determined that no new EAs or EISs are expected to commence during the next 12 to 24-month period.

275

2011 Annual Planning Summary for Fermi Site Office (FSO)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Fermi Site Office (See Science APS).

276

Annual site environmental report for calendar year 1996  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program. Western markets power from 56 hydroelectric power generating plants in its service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The significant environmental projects and issues Western was involved with in 1996 are discussed in this report.

NONE

1996-12-31T23:59:59.000Z

277

Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2008  

SciTech Connect

Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, "Environmental Protection Program," and DOE Order 5400.5, "Radiation Protection of the Public and the Environment." The environmental surveillance sampling design is described in the "Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office." This document contains the calendar year 2008 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2008, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2008.

Bisping, Lynn E.

2008-01-01T23:59:59.000Z

278

Hanford Site Environmental Surveillance Data Report for Calendar Year 2000  

SciTech Connect

This data report contains the actual raw data used to create tables and summaries in the Hanford Site Environmental Report 2000. This report also includes data from special sampling studies performed in 2000.

Bisping, Lynn E.

2001-09-27T23:59:59.000Z

279

Hanford Site Groundwater Monitoring for Fiscal Year 2006  

SciTech Connect

This report presents the results of groundwater monitoring for FY 2006 on DOE's Hanford Site. Results of groundwater remediation, vadose zone monitoring, and characterization are summarized. DOE monitors groundwater at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act (AEA), the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), and Washington Administrative Code (WAC).

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2007-03-01T23:59:59.000Z

280

Brookhaven National Laboratory site environmental report for calendar year 1994  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and presents summary information about environmental compliance for 1994. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, groundwater, fauna and vegetation were made at the Brookhaven National Laboratory site and at sites adjacent to the Laboratory.

Naidu, J.R.; Royce, B.A. [eds.

1995-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Strategic Petroleum Reserve site environmental report for calendar year 1997  

SciTech Connect

The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts for the US Department of Energy (DOE) Strategic Petroleum Reserve (SPR). The SER, provided annually in accordance with DOE order 5400.1, serves the public by summarizing monitoring data collected to assess how the SPR impacts the environment. The SER provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits. Included in this report is a describe of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1997. Two of these highlights include decommissioning of the Weeks Island site, involving the disposition of 11.6 million m{sup 3} (73 million barrels) of crude oil inventory, as well as the degasification of over 12.6 million m{sup 3} (79.3 million barrels) of crude oil inventory at the Big Hill and Bryan Mound facilities.

NONE

1998-11-01T23:59:59.000Z

282

Northwest Power and Conservation Council Kennecott Energy comments on 5 year plan  

E-Print Network (OSTI)

of energy is one of the most fundamental contributors to economic development and quality of life. EnergyNorthwest Power and Conservation Council Kennecott Energy comments on 5 year plan The availability recommendation in the plan for the next five years states, "Develop resources that can reduce cost and risk

283

SUGGESTED THREE-YEAR GRADUATION PLAN Human Development and Family Studies Case Management  

E-Print Network (OSTI)

Development 3 See note 1 on page 2 HDFS 25512 Management of Family Resources 3 HDFS 34031 Cultural DiversitySUGGESTED THREE-YEAR GRADUATION PLAN Human Development and Family Studies ­Case Management THREE-YEAR GRADUATION PLAN Human Development and Family Studies ­Case Management for Individuals

Sheridan, Scott

284

Work plan addendum for the remedial investigation and feasibility study of the Salmon Site  

SciTech Connect

This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of Energy (DOE) is conducting a focused and phased site characterization as a part, of the RI/FS. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) for evaluating hazardous waste sites on the National Priorities List (NPL). The SS is not listed on the NPL, but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA.

NONE

1995-11-01T23:59:59.000Z

285

INL-Site Idaho Completion Project Long Term Stewardship Strategic Plan  

SciTech Connect

This Strategic Plan provides a brief historical overview of ICP long-term stewardship at the INL Site and the major goals and strategies that will drive the continued implementation of long-term stewardship in the future. The specific activities and processes that will be required to implement these goals should be outlined within an implementation plan and within implementing procedures and work plans.

Olaveson, B.

2007-09-17T23:59:59.000Z

286

NAREL Quality Assurance Project Plan Deployment of Air Monitors to the WIPP Site  

E-Print Network (OSTI)

Requirements for Quality Assurance Project Plans," United States Environmental Protection Agency, OfficeNAREL Quality Assurance Project Plan Deployment of Air Monitors to the WIPP Site Effective Date April 5, 2014 WIPP/QAPP-1 National Analytical Radiation Environmental Laboratory Office of Radiation

287

Being Relevant in Tough Times: TRIUMF's Five-Year Plan  

ScienceCinema (OSTI)

Perhaps better known to the international community than its own neighbors, TRIUMF is Canada's national laboratory for particle and nuclear physics. Working with the Canadian scientific community, TRIUMF has formulated a new vision to transform the laboratory and deliver a whole new level of performance and impact. The plan capitalizes on platform technologies (superconducting RF cavities for accelerator physics and radiotracers in nuclear medicine) and exploits Canada's role in ATLAS and the LHC. I will describe the key elements of the plan and discuss the science-policy landscape in which TRIUMF must make its case.

Tim Meyer

2010-01-08T23:59:59.000Z

288

Brookhaven National Laboratory site environmental report for calendar year 1996  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and summarizes information about environmental compliance for 1996. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and of a variety of radionuclides and chemical compounds in the ambient air, soil, sewage effluent, surface water, groundwater, fauna, and vegetation were made at the Brookhaven National Laboratory site and at adjacent sites. The report also evaluates the Laboratory`s compliance with all applicable guides, standards, and limits for radiological and non-radiological emissions and effluents to the environment.

Schroeder, G.L.; Paquette, D.E.; Naidu, J.R.; Lee, R.J.; Briggs, S.L.K.

1998-01-01T23:59:59.000Z

289

West Valley Demonstration Project site environmental report, calendar year 1997  

SciTech Connect

This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

None

1998-06-01T23:59:59.000Z

290

Proposed site treatment plan (PSTP) Volumes I & II & reference document, Revision 3  

SciTech Connect

The Federal Facility Compliance Act requires the Department of Energy to undertake a national effort to develop Site Treatment Plans for each of its sites generating or storing mixed waste. Mixed waste contains both a hazardous waste subject to the Resource Conservation and Recovery Act and radioactive material subject to the Atomic Energy Act of 1954. The Site Treatment Plan for the Savannah River Site proposes how SRS will treat mixed waste that is now stored on the site and mixed waste that Will be generated in the future. Also, the Site Treatment Plan identifies Savannah River Site mixed wastes that other Department of Energy facilities could treat and mixed waste from other facilities that the Savannah River Site could treat. The Site Treatment Plan has been approved by the State of South Carolina. The Department of Energy Will enter into a consent order with the State of South Carolina by October 6, 1995. The consent order will contain enforceable commitments to treat mixed waste.

Helmich, E.; Noller, D.K.; Wierzbicki, K.S. [and others

1995-09-27T23:59:59.000Z

291

Summary of the Hanford Site Environmental Report for Calendar Year 2005  

SciTech Connect

This small booklet provides highlights of the environmental monitoring at the Hanford Site during 2005. It is a summary of the information contained in the larger report: Hanford Site Environmental Monitoring for Calendar Year 2005.

Hanf, Robert W.; Morasch, Launa F.; Poston, Ted M.; Dirkes, Roger L.

2006-09-28T23:59:59.000Z

292

Long-Term Surveillance Plan for the Site A/Plot M Sites, Palos Forest Preserve, Cook COunty, Illinois  

Office of Legacy Management (LM)

Long-Term Surveillance Plan for the Site A/Plot M Sites Palos Forest Preserve, Cook County, Illinois September 1999 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC 99-06 Document Number S00218 DOE/Grand Junction Office Site A/Plot M LTSP September 1999 Page iii Contents 1.0 Introduction......................................................................................................................... 1- 1 1.1 Purpose....................................................................................................................... 1- 1 1.2 Legal and Regulatory Requirements.......................................................................... 1- 1

293

Summary of Hanford Site Groundwater Monitoring for Fiscal Year 2004  

SciTech Connect

This booklet is the summary chapter of the large groundwater report printed in booklet form with a CD of the complete report inside the back cover. It contains information on the current status of groundwater beneath the Hanford Site, highlights of FY 2004 monitoring, and emerging issues.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2005-04-05T23:59:59.000Z

294

Strategic Petroleum Reserve Site Environmental Report for calendar year 1994  

SciTech Connect

The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. The SER, provided annually in accordance with Department of Energy DOE Order 5400.1, serves the public by summarizing monitoring data collected to assess how the Strategic Petroleum Reserve (SPR) impacts the environment. This report (SER) provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits. Included in this report is a description of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1994. Two of these highlights include decommissioning of the Weeks Island facility (disposition of 73 million barrels of crude oil inventory) as well as the degasification of up to 144 million barrels of crude oil inventory at the Bayou Choctaw, Big Hill, Bryan Mound, and West Hackberry facilities. The decision to decommission the Weeks Island facility is a result of diminishing mine integrity from ground water intrusion. Degasifying the crude oil is required to reduce potentially harmful emissions that would occur during oil movements. With regard to still another major environmental action, 43 of the original 84 environmental findings from the 1992 DOE Tiger Team Assessment were closed by the end of 1994. Spills to the environment, another major topic, indicates a positive trend. Total volume of oil spilled in 1994 was only 39 barrels, down from 232 barrels in 1993, and the total volume of brine spilled was only 90 barrels, down from 370 barrels in 1993. The longer term trend for oil and brine spills has declined substantially from 27 in 1990 down to nine in 1994.

NONE

1995-05-31T23:59:59.000Z

295

Strategic petroleum reserve site environmental report for calendar year 1995  

SciTech Connect

The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. Included in this report is a description of each site`s environment, an overview of the Strategic Petroleum Reserve (SPR) environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1995. Two of these highlights include decommissioning of 3 the weeks Island facility, involving the disposition of 11.6 million m{sup 3} (73 million barrels) of crude oil inventory, as well as the degasification of over 4.5 million m{sup 3} (30 million barrels) of crude oil inventory at the Bryan Mound and West Hackberry facilities. The decision to decommission the weeks Island facility is a result of diminishing mine integrity from ground water intrusion. Transfer of Weeks Island oil began in November, 1995 with 2.0 million m{sup 3} (12.5 million barrels) transferred by December 31, 1995. Degasifying the crude oil is a major pollution prevention initiative because it will reduce potentially harmful emissions that would occur during oil movements by three or more orders of magnitude. Spills to the environment, another major topic, indicates a positive trend. There were only two reportable oil and three reportable brine spills during 1995, down from a total of 10 reportable spills in 1994. Total volume of oil spilled in 1995 was 56.3 m{sup 3} (354 barrels), and the total volume of brine spilled was 131.1 m{sup 3} (825 barrels). The longer term trend for oil and brine spills has declined substantially from 27 in 1990 down to five in 1995. All of the spills were reported to appropriate agencies and immediately cleaned up, with no long term impacts observed.

NONE

1996-05-31T23:59:59.000Z

296

Audience/Panel Discussion: Sites Lesson Learned about Activity-level Work Planning and Control Using EFCOG Work Planning and Control Guideline  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Donna J. Governor, Deputy Dept Mgr for Planning & Integration, Lawrence Livermore National Laboratory. Lawrence Livermore National Laboratory work planning and control lessons learned and audience/panel discussion on site's lessons learned about Activity-level Work Planning and Control using EFCOG Work Planning and Control Guideline Document.

297

Review of the Nevada National Security Site Criticality Safety Program Corrective Action Plan Closure, May 2013  

NLE Websites -- All DOE Office Websites (Extended Search)

Nevada National Security Site Nevada National Security Site Criticality Safety Program Corrective Action Plan Closure May 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................ 1 2.0 Scope.................................................................................................................................................. 1 3.0 Background ......................................................................................................................................... 1 4.0 Methodology ....................................................................................................................................... 2

298

Review of the Nevada National Security Site Criticality Safety Program Corrective Action Plan Closure, May 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada National Security Site Nevada National Security Site Criticality Safety Program Corrective Action Plan Closure May 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................ 1 2.0 Scope.................................................................................................................................................. 1 3.0 Background ......................................................................................................................................... 1 4.0 Methodology ....................................................................................................................................... 2

299

Ris-R-1234(EN) Land Use Planning and Chemical Sites  

E-Print Network (OSTI)

Risø-R-1234(EN) Land Use Planning and Chemical Sites Summary Report Carsten Grønberg (editor) Risø chemical sites has been developed for making decisions in local and regional administrations methodology is a GIS based software platform enabling the users to generate alternatives, select the preferred

300

Hanford Site environmental report for calendar year 1996  

SciTech Connect

The Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts. The report is written to meet requirements and guidelines of the U.S. Department of Energy (DOE) and to meet the needs of the public. This summary has been written with a minimum of technical terminology.

Dirkes, R.L.; Hanf, R.W. [eds.] [eds.

1997-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Mound site environmental report for calendar year 1992  

SciTech Connect

The purpose of this report is to inform the public about the impact of Mound operations on the population and the environment. Mound is a government-owned facility operated by EG&G Mound Applied Technologies for the US Department of Energy (DOE). This integrated production, development, and research site performs work in support of DOE`s weapon and energy related programs, with emphasis on explosive, nuclear and energy technologies.

Bauer, L.R.

1993-07-01T23:59:59.000Z

302

Coal Power Systems strategic multi-year program plans  

SciTech Connect

The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

None

2001-02-01T23:59:59.000Z

303

FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009  

Energy.gov (U.S. Department of Energy (DOE))

The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations.

304

Bioenergy Technologies Office Multi-Year Program Plan: July 2014...  

Energy Savers (EERE)

years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational...

305

Bioenergy Technologies Office Multi-Year Program Plan: November...  

Energy Savers (EERE)

years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational...

306

Long-term surveillance plan for the Mexican Hat disposal site, Mexican Hat, Utah  

SciTech Connect

This plan describes the long-term surveillance activities for the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site at Mexican Hat, Utah. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This long-term surveillance plan (LTSP) was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive material (RRM). This LTSPC documents the land ownership interests and details how the long-term care of the disposal site will be accomplished.

NONE

1996-01-01T23:59:59.000Z

307

Mitigation action plan for remedial action at the Uranium Mill Tailing Sites and Disposal Site, Rifle, Colorado  

SciTech Connect

The Estes Gulch disposal site is approximately 10 kilometers (6 miles) north of the town of Rifle, off State Highway 13 on Federal land administered by the Bureau of Land Management. The Department of Energy (DOE) will transport the residual radioactive materials (RRM) by truck to the Estes Gulch disposal site via State Highway 13 and place it in a partially below-grade disposal cell. The RRM will be covered by an earthen radon barrier, frost protection layers, and a rock erosion protection layer. A toe ditch and other features will also be constructed to control erosion at the disposal site. After removal of the RRM and disposal at the Estes Gulch site, the disturbed areas at all three sites will be backfilled with clean soils, contoured to facilitate surface drainage, and revegetated. Wetlands areas destroyed at the former Rifle processing sites will be compensated for by the incorporation of now wetlands into the revegetation plan at the New Rifle site. The UMTRA Project Office, supported by the Remedial Action Contractor (RAC) and the Technical Assistance Contractor (TAC), oversees the implementation of the MAP. The RAC executes mitigation measures in the field. The TAC provides monitoring of the mitigation actions in cases where mitigation measures are associated with design features. Site closeout and inspection compliance will be documented in the site completion report.

Not Available

1992-07-01T23:59:59.000Z

308

Portsmouth Site Plant Surpasses Five Years Without Lost-Time Accident |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plant Surpasses Five Years Without Lost-Time Plant Surpasses Five Years Without Lost-Time Accident Portsmouth Site Plant Surpasses Five Years Without Lost-Time Accident November 26, 2013 - 12:00pm Addthis BWCS employees from all departments of the DUF6 project at the Portsmouth site come together to mark five years without a lost-time accident. BWCS employees from all departments of the DUF6 project at the Portsmouth site come together to mark five years without a lost-time accident. Russ Hall, environment, safety and health supervisor, changes the DUF6 project sign to mark five years without a lost-time accident. Russ Hall, environment, safety and health supervisor, changes the DUF6 project sign to mark five years without a lost-time accident. BWCS employees from all departments of the DUF6 project at the Portsmouth site come together to mark five years without a lost-time accident.

309

General Counsel`s office FY 1995 site support program plan WBS 6.10.5  

SciTech Connect

The General Counsel`s office provides legal counsel to all levels of WHC management; administers the intellectual property program; coordinates all WHC investigative activity and supports WHC activities to ensure compliance with all applicable federal, state, and local laws, DOE directives, contractual provisions, and other requirements. In so doing, the Office of General Counsel supports the Hanford site mission of transforming the Hanford site into an environmentally attractive and economically sustainable community. This document briefs the FY95 site support plan.

Moreno, S.R.

1994-09-01T23:59:59.000Z

310

2012 Annual Workforce Analysis and Staffing Plan Report - Nuclear Energy Oak Ridge Site Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Energy Oak Ridge Site Office Nuclear Energy Oak Ridge Site Office 2012 Annual Workforce Analysis and Staffing Plan Report for Federal Technical Personnel January 2013 DOENE-ORSO CONCURRENCE AND APPROVAL CONCURRENCE: Marianne Heiskell, Lease and Technical Management Branch Chief Nuclear Energy Oak Ridge Site Office Randy DeVault, Regulatory Management Branch Chief, NE-ORSO Nucl~ffic ,___.~,. Larry Perkins, Deputy Manager, Nuclear Energy Oak Ridge Site Office APPROVAL: January 2013 2012 Annual Workforce Analysis and Staffing Plan Report Date I /v/13 Date! 1/~3/13 Date ,;:L :/ /. * ~ Page ii DOENE-ORSO Table of Contents Section 1: Current Mission(s) of the Organization and Potential Changes Section 2: Technical Staffing Section 3: Current Shortages and Plans for Filling

311

Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan  

SciTech Connect

Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.

NONE

1998-03-01T23:59:59.000Z

312

Brookhaven National Laboratory site environmental report for calendar year 1993  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at BNL and presents summary information about environmental compliance for 1993. To evaluate the effect of BNL operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, ground water and vegetation were made at the BNL site and at sites adjacent to the Laboratory. Brookhaven National Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment were evaluated. Among the permitted facilities, two instances, of pH exceedances were observed at recharge basins, possible related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant (STP) to the Peconic River exceeded on five occasions, three for residual chlorine and one each for iron and ammonia nitrogen. The chlorine exceedances were related to a malfunctioning hypochlorite dosing pump and ceased when the pump was repaired. While the iron and ammonia-nitrogen could be the result of disturbances to the sand filter beds during maintenance. The environmental monitoring data has identified site-specific contamination of ground water and soil. These areas are subject to Remedial Investigation/Feasibility Studies (RI/FS) under the Inter Agency Agreement (IAG). Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at BNL are minimal and pose no threat to the public or to the environment. This report meets the requirements of DOE Orders 5484. 1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Royce, B.A. [eds.

1994-05-01T23:59:59.000Z

313

HANFORD SITE ENVIRONMENTAL DATA FOR CALENDAR YEAR 1989 - GROUND WATER  

SciTech Connect

In a continuing effort for the U.S. Department of Energy, Pacific Northwest Laboratory (PNL) is conducting ground-water monitoring at the Hanford Site, near Richland, Washington. This document contains the data listing of monitoring results obtained by PNL and Westinghouse Hanford Company during the period January through December 1989. Samples taken during 1989 were analyzed and reported by United States Testing Company, Inc., Richland, Washington. The data listing contains all chemical results (above contractual reporting limits) and radiochemical results (for which the result is larger than two times the total error).

Bryce, R. W.; Gorst, W. R.

1990-12-01T23:59:59.000Z

314

Hanford Site Annual Treatability Studies Report, Calendar Year 2002  

SciTech Connect

This report provides information required to be reported annually by the Washington Administrative Code (WAC) 173-303-071 (3)(r)(ii)(F) and (3)(s)(ix) on the treatability studies conducted on the Hanford Site in 2002. These studies were conducted as required by WAC 173-303-071, Excluded Categories of Waste, sections (3)(r) and (s). Unless otherwise noted, the waste samples were provided by and the treatability studies were performed for the U.S. Department of Energy, Richland Operations Office, P.O. Box 550, Richland, Washington 99352. The U.S. Environmental Protection Agency identification number for these studies is WA7890008967.

Grohs, Eugene L.

2003-02-28T23:59:59.000Z

315

Pinellas Plant annual site environmental report for calendar year 1993  

SciTech Connect

Martin Marietta Specialty Components, Inc., and the US Department of Energy are committed to successfully administering a high quality Environmental Management Program at the Pinellas Plant in Pinellas County, Florida. Part of this commitment includes accurately documenting and communicating to the Pinellas Plant stakeholder the results of their environmental compliance and monitoring activities. The Annual Site Environmental Report presents a comprehensive summary of the results of the environmental monitoring, waste management, and environmental restoration programs at the Pinellas Plant for 1993. This report also includes the plant`s performance in the areas of compliance with applicable regulatory requirements and standards and identifies major environmental management program initiatives and accomplishments for 1993.

Not Available

1994-06-10T23:59:59.000Z

316

Brookhaven National Laboratory site environmental report for calendar year 1995  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and summarizes information about environmental compliance for 1995. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and of a variety of radionuclides and chemical compounds in the ambient air, soil, sewage effluent, surface water, groundwater, fauna, and vegetation were made at the Brookhaven National Laboratory site and at adjacent sites. The report also evaluates the Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment. Areas of known contamination are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement established by the Department of Energy, Environmental Protection Agency and the New York Department of Environmental Conservation. Except for identified areas of soil and groundwater contamination, the environmental monitoring data has continued to demonstrate that compliance was achieved with the applicable environmental laws and regulations governing emission and discharge of materials to the environment. Also, the data show that the environmental impacts at Brookhaven National Laboratory are minimal and pose no threat to the public nor to the environment. This report meets the requirements of Department of Energy Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Paquette, D.E.; Schroeder, G.L. [eds.] [and others

1996-12-01T23:59:59.000Z

317

Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.  

SciTech Connect

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receive credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.

Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

2003-01-01T23:59:59.000Z

318

INL Site Executable Plan for Energy and Transportation Fuels Management  

SciTech Connect

It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

Ernest L. Fossum

2008-11-01T23:59:59.000Z

319

BROOKHAVEN NATIONAL LABORATORY SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 1994.  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and presents summary information about environmental compliance for 1994. To evaluate the effect of Brookhaven National Laboratory's operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, groundwater, fauna and vegetation were made at the Brookhaven National Laboratory site and at sites adjacent to the Laboratory. Brookhaven National Laboratory's compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment were evaluated. Among the permitted facilities, two instances of pH exceedances were observed at recharge basins, possibly related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant to the Peconic River exceeded. on ten occasions, one each for fecal coliform and 5-day Biochemical Oxygen Demand (avg.) and eight for ammonia nitrogen. The ammonia and Biochemical Oxygen Demand exceedances were attributed to the cold winter and the routine cultivation of the sand filter beds which resulted in the hydraulic overloading of the filter beds and the possible destruction of nitrifying bacteria. The on-set of warm weather and increased aeration of the filter beds via cultivation helped to alleviate this condition. The discharge of fecal coliform may also be linked to this occurrence, in that the increase in fecal coliform coincided with the increased cultivation of the sand filter beds. The environmental monitoring data has identified site-specific contamination of groundwater and soil. These areas are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement. Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at Brookhaven National Laboratory are minimal and pose no threat to the public or to the environment. This report meets the requirements of Department of Energy Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

NAIDU,J.R.; ROYCE,B.A.

1995-05-01T23:59:59.000Z

320

Annual site environmental report for calendar year 1999  

SciTech Connect

Many State and Federal environmental protection laws and regulations apply to Western. Western facilities are within the jurisdiction of six Environmental Protection Agency (EPA) regions and 17 states. Western's environmental policy statement directs employees to prevent, control, and abate environmental pollution at their facilities, and when possible, enhance the environment. To help assure conformance with all regulatory requirements, and to achieve its pollution prevention goals and objectives, Western is developing an Environmental Management System (EMS). One of the major regulatory impacts on Western continues to be the Toxic Substances Control Act (TSCA) that regulates the use of polychlorinated biphenyls (PCB). Western's policy is to eliminate PCBs from its system wherever economically and operationally possible. This will lessen the impact of PCB regulations on operations and the impact of PCBs on the environment. Executive Order 12856 requires Federal Agencies to comply with the Emergency Planning and Community Right-to-Know Act (EPCRA). As with other DOE elements, Western has been complying with EPCRA since before the Executive Order was issued. To summarize, in 1999, Western's Regional offices implemented programs to notify State and local emergency response entities in accordance with Section 311 and 312 of EPCRA. Chemical inventories indicate that Western does not manufacture, process, or otherwise use reportable quantities of EPCRA Section 313 chemicals so Toxic Release reports were not required.

NONE

2000-04-14T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Niagara Falls Storage Site environmental monitoring report. Calendar year 1983  

SciTech Connect

During 1983, an environmental monitoring program was continued at the Niagara Falls Storage Site, a United States Department of Energy (DOE) surplus facility located in Niagara County, New York presently used for the storage of radioactive residues, contaminated soils and rubble. The monitoring program at NFSS measures radon concentrations in air, uranium and radium concentrations in surface water, groundwater, and sediments, and external gamma exposure rates. Radiation doses to the public are also calculated. Environmental samples collected are analyzed to determine compliance with applicable standards. Comparison of 1983 monitoring results with 1982 results shows a significant decrease in radon levels at almost every monitoring location. External gamma exposure rates also showed a general decrease. 9 references, 10 figures, 11 tables

Not Available

1984-07-01T23:59:59.000Z

322

General Counsel`s Office FY 1996 Site Support Program Plan: WBS 6.10.5. Revision 1  

SciTech Connect

This is the General Counsel`s Office site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, description of activities, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail.

Moreno, S.R.

1995-09-01T23:59:59.000Z

323

Brookhaven National Laboratory site environmental report for calendar year 1990  

SciTech Connect

Brookhaven National Laboratory (BNL) carries out basic and applied research in the following fields: high-energy nuclear and solid state physics; fundamental material and structure properties and the interactions of matter; nuclear medicine, biomedical and environmental sciences; and selected energy technologies. In conducting these research activities, it is Laboratory policy to protect the health and safety of employees and the public, and to minimize the impact of BNL operations on the environment. This document is the BNL environmental report for the calendar year 1990 for the safety and Environmental Protection division and corners topics on effluents, surveillance, regulations, assessments, and compliance.

Miltenberger, R.P.; Royce, B.A.; Naidu, J.R.

1992-01-01T23:59:59.000Z

324

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Appendix C: Hydrogen Quality  

Energy.gov (U.S. Department of Energy (DOE))

Appendix C: Hydrogen Quality section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated February 2012. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

325

engineering101 2013-2014 program planning guide for first-year engineering students  

E-Print Network (OSTI)

engineering101 2013-2014 program planning guide for first-year engineering students in the Whiting geography CREATE materials science integrated circuits sensors microsystems nanotechnology robotics systems optimization game theory cryptology mathematical modeling STUDY DESIGN DISCOVER EXPERIMENT LEARN

Ghosh, Somnath

326

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2013 Activities and Achievements  

E-Print Network (OSTI)

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2013 Activities Institute for Telecommunication Sciences Pursuant to the Technology Transfer and Commercialization Act This report summarizes technology transfer activities and achievements of the Department of Commerce's (DOC

327

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2012 Activities and Achievements  

E-Print Network (OSTI)

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2012 Activities Institute for Telecommunication Sciences Pursuant to the Technology Transfer and Commercialization Act This report summarizes technology transfer activities and achievements of the Department of Commerce's (DOC

328

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan  

Energy.gov (U.S. Department of Energy (DOE))

The Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan describes the goals, objectives, technical targets, tasks, and schedules for all activities within the Fuel Cell Technologies Office.

329

Solid-State Lighting R&D Multi-Year Program Plan  

Energy.gov (U.S. Department of Energy (DOE))

This document describes the activities the Department will undertake over the next several years, and includes an overview of the status of SSL technology, the current DOE SSL portfolio, and the technology R&D plan.

330

HOISTING & RIGGING Assessment Plan--NNSA/Nevada Site Office Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HOISTING & RIGGING Assessment Plan--NNSA/Nevada Site Office HOISTING & RIGGING Assessment Plan--NNSA/Nevada Site Office Facility Representative Division HOISTING & RIGGING Assessment Plan--NNSA/Nevada Site Office Facility Representative Division : To determine that hoisting and rigging operations are conducted according to "industry best standards" for increasing equipment reliability while assuring worker safety, and to verify issues being addressed in BN Hoisting assessment. Criteria: Lifts are identified and categorized appropriately for scheduled maintenance. DOE-STD-1090-2001 An integrated process ensures safety issues are identified and controls established. DOE-STD-1090-2001 Personnel operating and maintaining the hoisting equipment are trained; they understand their roles and responsibilities. DOE-STD-1090-2001

331

Long-term surveillance plan for the South Clive disposal site Clive, Utah  

SciTech Connect

This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project South Clive disposal site in Clive, Utah. This LSTP describes the long-term surveillance program the DOE will implement to ensure the South Clive disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

NONE

1997-09-01T23:59:59.000Z

332

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada  

SciTech Connect

This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (FFACO, 1996 [as amended February 2008]). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. (1) CAS 01-23-02, Atmospheric Test Site - High Alt; (2) CAS 02-23-02, Contaminated Areas (2); (3) CAS 02-23-03, Contaminated Berm; (4) CAS 02-23-10, Gourd-Amber Contamination Area; (5) CAS 02-23-11, Sappho Contamination Area; (6) CAS 02-23-12, Scuttle Contamination Area; (7) CAS 03-23-24, Seaweed B Contamination Area; (8) CAS 03-23-27, Adze Contamination Area; (9) CAS 03-23-28, Manzanas Contamination Area; (10) CAS 03-23-29, Truchas-Chamisal Contamination Area; (11) CAS 04-23-02, Atmospheric Test Site T4-a; (12) CAS 05-23-06, Atmospheric Test Site; (13) CAS 09-23-06, Mound of Contaminated Soil; (14) CAS 10-23-04, Atmospheric Test Site M-10; and (15) CAS 18-23-02, U-18d Crater (Sulky). Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107. CAU 107 closure activities will consist of verifying that the current postings required under Title 10 Code of Federal Regulations (CFR) Part 835 are in place and implementing use restrictions (URs) at two sites, CAS 03-23-29 and CAS 18-23-02. The current radiological postings combined with the URs are adequate administrative controls to limit site access and worker dose.

NSTec Environmental Restoration

2008-09-30T23:59:59.000Z

333

Lessons Learned at the Nevada National Security Site Implementing the EFCOG Activity-level Work Planning and Control Guide  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Steele Coddington, Work Planning Manager, National Security Technologies, Nevada National Security Site. Lessons Learned Implementing Work Planning & Control. 6 Step Process for improving WP&C.

334

Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)  

SciTech Connect

The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

Lawrence, B.

2001-04-30T23:59:59.000Z

335

Pantex Plant site environmental report for calendar year 1989  

SciTech Connect

This report summarizes the environmental monitoring program at Pantex Plant for 1989. It has been prepared in accordance with the United States Department of Energy Order 5400.1. This report presents monitoring data for both radioactive and nonradioactive species in the local environment. Plant activities involve the handling of significant quantities of uranium, plutonium, and tritium in the form of completed parts received from other DOE facilities, resulting in a very low potential for release of these radionuclides to the atmosphere. In May 1989, there was an accidental release of 40,000 curies (Ci) of tritium (conservatively estimated). The normal releases during the year were 0.12 Ci of tritium and 21 {mu}Ci of uranium-238. The USEPA issued a draft Administrative Order of Consent under section 3008(h) in 1988. Negotiations between DOE and EPA are still continuing. Chromium at a level above drinking water standards was found in a perched groundwater well in zone 12. Also, trace amounts of solvents and high explosives were found in the perched groundwater in zone 12. 12 refs., 10 figs., 53 tabs.

Not Available

1990-05-01T23:59:59.000Z

336

Sectored Clean-up Work Plan for Housekeeping Category Waste Sites  

SciTech Connect

The Sectored Clean-up Work Plan (SCWP) replaces the Housekeeping Category Corrective Action Unit Work Plan and provides a strategy to be used for conducting housekeeping activities using a sectored clean-up approach. This work plan provides a process by which one or more existing housekeeping category Corrective Action Sites (CASS) from the Federal Facility Agreement and Consent Order and/or non-FFACO designated waste site(s) are grouped into a sector for simultaneous remediation and cleanup. This increases effectiveness and efficiencies in labor, materials, equipment, cost, and time. This plan is an effort by the U.S. Department of Energy to expedite work in a more organized and efficient approach. The objectives of this plan are to: Group housekeeping FFACO CASS and non-FFACO housekeeping sites into sectors and remediate during the same field visit; Provide consistent documentation on FFACO CAS and non-FFACO clean-up activities; Perform similar activities under one approved document; Remediate areas inside the Deactivation and Decommissioning facilities and compounds in a campaign-style remediation; and Increase efficiencies and cost-effectiveness, accelerate cleanups, reduce mobilization, demobilization, and remediation costs.

S. J. Nacht

2000-02-01T23:59:59.000Z

337

DNFSB recommendation 94-1 Hanford site integrated stabilization management plan  

SciTech Connect

In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O`Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE`s baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document is the fifth update of the Hanford SISMP.

McCormack, R.L.

1997-05-07T23:59:59.000Z

338

Legacy Management CERCLA Sites Quality Assurance Project Plan  

SciTech Connect

S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, Quality Assurance Requirements, ANSI/ASQC E4-2004, Quality Systems for Environmental Data and Technology Programs Requirements with Guidance for Use, and ISO 14001-2004, Environmental Management Systems, have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, Quality Assurance Program, identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, QA Program Implementation, identifies the TAC organizations that have responsibility for implementing the QA program requirements; and Appendix C of the QA Manual provides comparison tables that identify where the requirements of other standards are addressed in the QA Manual.

none,

2007-05-03T23:59:59.000Z

339

LONG-TERM SURVEILLANCE PLAN FOR THE GREEN RIVER, UTAH DISPOSAL SITE Ttable of Contents  

NLE Websites -- All DOE Office Websites (Extended Search)

LONG-TERM SURVEILLANCE PLAN FOR THE LONG-TERM SURVEILLANCE PLAN FOR THE GREEN RIVER, UTAH DISPOSAL SITE Ttable of Contents DOE/AL/62350-89 May 20, 1998 REV. 1 VER.4 08914TOC.DOC (GRN) i TABLE OF CONTENTS Section Page 1.0 INTRODUCTION ................................................................................................. 1-1 1.1 Background .................................................................................................... 1- 2 1.2 Licensing process ........................................................................................ 1-2 1.3. Acquisition .............................................................................................. 1-2 1.4 Long-term surveillance plan .................................................................... 1-3

340

DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1  

SciTech Connect

This document describes the plans of the Hanford Site for the safe interim storage of fissile materials. Currently, spent nuclear fuels reside in storage basins that have leaked in the past and are projected to leak in the future. Other problems in the basins include; sludge from decomposition, degraded cladding of fuel elements, and construction defects which make the basins seismically unsafe. This management plan describes the time and cost that it will take to implement a safe interim storage plan for the fissile materials.

McCormack, R.L.

1995-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites  

SciTech Connect

This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

Richman, Eric E.

2012-10-31T23:59:59.000Z

342

Department of Energy Announces Two Year Pay Freeze on Site and Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Two Year Pay Freeze on Site and Two Year Pay Freeze on Site and Facility Management Contractor Employees Department of Energy Announces Two Year Pay Freeze on Site and Facility Management Contractor Employees December 17, 2010 - 12:00am Addthis Washington DC - Following President Obama's recent proposal for a two-year pay freeze for all civilian federal workers, U.S. Energy Secretary Steven Chu today announced a decision to stop salary and bonus pool increases for site and facility management contractor employees, who manage day-to-day operations at certain Department of Energy sites and facilities, including national laboratories. "As our nation continues to recover from these challenging economic times, households and small businesses across the country are making sacrifices,"

343

Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1  

SciTech Connect

This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond.

NONE

1995-09-01T23:59:59.000Z

344

Hazelwood Interim Storage Site annual site environmental report: Calendar year 1986  

SciTech Connect

During 1986, the environmental monitoring program was continued at the Hazelwood Interim Storage Site (HISS), a US Department of Energy (DOE) facility located in the City of Hazelwood, Missouri. Originally known as the Cotter Corporation site on Latty Avenue in Hazelwood, the HISS is presently used for the storage of soils contaminated with residual radioactive material. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action and environmental monitoring program are being conducted at the site and at vicinity properties by Bechtel National, Inc., Project Management Contractor for FUSRAP. The monitoring program at the HISS measures radon gas concentrations in air; external gamma radiation levels; and uranium, radium, and thorium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and assess its potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the scenario described in this report, the maximally exposed individual at the HISS would receive an annual external exposure approximately equivalent to 2% of the DOE radiation protection standard of 100 mrem/yr. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles. The cumulative dose to the population within an 80-km (50-mi) radius of the HISS that would result from radioactive materials present at the site would be indistinguishable from the dose that the same population would receive from naturally occurring radioactive sources. Results of the 1986 monitoring show that the HISS is in compliance with the DOE radiation protection standard. 11 refs., 6 figs., 10 tabs.

Not Available

1987-06-01T23:59:59.000Z

345

Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554.

David A. Strand

2004-10-01T23:59:59.000Z

346

RCRA Assessment Plan for Single-Shell Tank Waste Management Area A-AX at the Hanford Site  

SciTech Connect

This document describes a groundwater assessment plan for the single-shell tank systems in Waste Management Area A-AX at the Hanford Site.

Narbutovskih, Susan M.; Chou, Charissa J.

2006-03-03T23:59:59.000Z

347

Visible, Durable, Enforceable Institutional Controls: Weldon Spring Site - A 10-Year Journey - 13190  

SciTech Connect

The DOE Office of Legacy Management's (LM's) mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. This includes all engineered and institutional controls (ICs) designed as another level of assurance to prevent exposure to residual contamination and waste. The development and management of ICs has been, and continues to be, a critical component to the success of LM surveillance and maintenance activities. Many major federal laws, Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs to appropriately limit access to, or uses of, land, facilities, and other real and personal properties; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. The ICs at the Weldon Spring, Missouri, Site were developed in close coordination with federal and state regulators. An Explanation of Significant Differences (ESD) was issued in February 2005, which clarified the use restrictions necessary for the remedial actions specified in the Records of Decision for the separate operable units to remain protective over the long-term. The operable units included the Chemical Plant Operable Unit, the Chemical Plant Groundwater Operable Unit, and the Quarry Residuals Operable Unit. The ESD clarified specific requirements for each site area that needed use restrictions and established how DOE would implement, maintain, and monitor the specific requirements. DOE developed the Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Weldon Spring, Missouri, Site (LTS and M Plan) that addressed the full scope of the site management activities necessary to ensure that the Weldon Spring Site remains protective over the long-term. The LTS and M Plan is revised periodically to ensure its applicability to changing site, regulatory, or procedural conditions. In addition to addressing such activities as long-term groundwater monitoring and disposal cell maintenance, the LTS and M Plan was developed and issued to ensure that the use restrictions identified in the ESD were properly imposed and maintained. The LTS and M Plan included a detailed IC Implementation Plan, which includes a process for evaluating and identifying specific IC mechanisms that best accomplish the objectives set out in the ESD. Consistent with EPA guidance on selecting ICs, various IC mechanisms were evaluated, including government controls, proprietary controls, enforcement tools, and informational devices. Where appropriate, redundant mechanisms were employed to increase the effectiveness of the ICs. Information in the IC Implementation Plan includes: (1) a discussion of current site conditions (reflecting post-remedial action conditions for the Chemical Plant and Quarry Areas and the risk-basis for why use restrictions are needed); (2) the objectives of, or performance expectations for, the use restrictions; (3) specific ICs already in place and additional mechanisms identified for implementation; (4) a schedule for implementing additional ICs; (5) procedures for maintaining the ICs and for conducting periodic inspections; and (6) general provisions for the implementing ICs for the site. The actual agreements and documentation of the various ICs are included in an appendix of the LTS and M Plan. These documents are also available via the internet from the authorizing agencies (County, Missouri Department of Natural Resources, EPA, etc.) The Weldon Spring Site personnel have been successful in finalizing each of the ICs that were established for the site. The planning, establishment, and implementation of the ICs was a long and detailed process with several lessons-learned that were identified along the way. (authors)

Uhlmeyer, Terri; Thompson, Randy [Stoller LMS Team (United States)] [Stoller LMS Team (United States); Starr, Ken [DOE Office of Legacy Management (United States)] [DOE Office of Legacy Management (United States)

2013-07-01T23:59:59.000Z

348

St. Louis Airport Site. Annual site environmental report, calendar year 1985. Formerly Utilized Sites Remedial Action Program (FUSRAP). Revision 1  

SciTech Connect

During 1985, the environmental monitoring program was continued at the St. Louis Airport Site (SLAPS) in St. Louis County, Missouri. The ditches north and south of the site have been designated for cleanup as part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). The monitoring program at the SLAPS measures radon gas concentrations in air; external gamma radiation dose rates; and uranium, thorium, and radium concentrations in surface water, groundwater, and sediment. Potential radiation doses to the public are also calculated. Because the site is not controlled or regulated by the DOE, the DOE Derived Concentration Guides (DCGs) are not applicable to SLAPS, but are included only as a basis for comparison. The DOE DCGs and the DOE radiation protection standard have been revised. (Appendix B). During 1985, annual average radon levels in air at the SLAPS were below the DCG for uncontrolled areas. External gamma monitoring in 1985 showed measured annual gamma dose rates ranging from 3 to 2087 mrem/y, with the highest value occurring in an area known to be contaminated. The calculated maximum dose at the site boundary, assuming limited occupancy, would be 6 mrem/y. Average annual concentrations of /sup 230/Th, /sup 226/Ra, and total uranium in surface waters remained below the DOE DCG. The on-site groundwater measurements showed that average annual concentrations of /sup 230/Th, /sup 226/Ra and total uranium were within the DOE DCGs. Although there are no DCGs for sediments, all concentrations of total uraniu, /sup 230/Th, and /sup 226/Ra were below the FUSRAP Guidelines.

Not Available

1986-09-01T23:59:59.000Z

349

Summary of the Hanford Site Environmental Report for Calendar Year 2008  

SciTech Connect

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2008." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2009 information is included where appropriate.

Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

2009-09-15T23:59:59.000Z

350

Summary of the Hanford Site Environmental Report for Calendar Year 2007  

SciTech Connect

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2007." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights signifi cant environmental and public protection programs and efforts. Some historical and early 2008 information is included where appropriate.

Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

2008-09-10T23:59:59.000Z

351

Summary of the Hanford Site Environmental Report for Calendar Year 2009  

SciTech Connect

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2009." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2010 information is included where appropriate.

Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

2010-09-30T23:59:59.000Z

352

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 496: Buried Rocket Site, Antelope Lake, Tonopah Test Range  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) plan details the activities necessary to close Corrective Action Unit 496: Buried Rocket Site, Antelope Lake. CAU 496 consists of one site located at the Tonopah Test Range, Nevada.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

2004-05-01T23:59:59.000Z

353

Bioenergy Technologies Office Multi-Year Program Plan: May 2013 Update  

Energy.gov (U.S. Department of Energy (DOE))

This is the May 2013 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

354

Toy to the World: Savannah River Site Celebrates 21 Years of Bringing Joy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Toy to the World: Savannah River Site Celebrates 21 Years of Toy to the World: Savannah River Site Celebrates 21 Years of Bringing Joy to Kids Toy to the World: Savannah River Site Celebrates 21 Years of Bringing Joy to Kids December 11, 2012 - 12:00pm Addthis An elf from DOE's Savannah River Site poses with Santa Claus, who holds a bike, one of the more than 14,200 toys federal employees and contractors donated to the U.S. Marine Toys for Tots Program. Mounds of bikes and other donated toys for the program can be seen in the background. An elf from DOE's Savannah River Site poses with Santa Claus, who holds a bike, one of the more than 14,200 toys federal employees and contractors donated to the U.S. Marine Toys for Tots Program. Mounds of bikes and other donated toys for the program can be seen in the background.

355

Site characterization plan for groundwater in Waste Area Grouping 1 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

The Waste Area Grouping (WAG) 1 Groundwater Operable Unit (OU) at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, is undergoing a site characterization to identify environmental contamination that may be present. This document, Site Characterization Report for Groundwater in Waste Area Grouping I at Oak Ridge National Laboratory, Oak Ridge, Tennessee, identifies areas of concern with respect to WAG 1 groundwater and presents the rationale, justification, and objectives for conducting this continuing site characterization. This report summarizes the operations that have taken place at each of the areas of concern in WAG 1, summarizes previous characterization studies that have been performed, presents interpretations of previously collected data and information, identifies contaminants of concern, and presents an action plan for further site investigations and early actions that will lead to identification of contaminant sources, their major groundwater pathways, and reduced off-site migration of contaminated groundwater to surface water. Site characterization Activities performed to date at WAG I have indicated that groundwater contamination, principally radiological contamination, is widespread. An extensive network of underground pipelines and utilities have contributed to the dispersal of contaminants to an unknown extent. The general absence of radiological contamination in surface water at the perimeter of WAG 1 is attributed to the presence of pipelines and underground waste storage tank sumps and dry wells distributed throughout WAG 1 which remove more than about 40 million gal of contaminated groundwater per year.

Lee, R.R.; Curtis, A.H.; Houlberg, L.M.; Purucker, S.T.; Singer, M.L.; Tardiff, M.F.; Wolf, D.A.

1994-07-01T23:59:59.000Z

356

The National Energy Technology Laboratory Annual Site Environmental Report for Calendar Year 2001  

SciTech Connect

No significant environmental problems were identified at the National Energy Technology Laboratory (NETL) sites in Morgantown (MGN), Pittsburgh (PGH), Tulsa (NPTO) and Fairbanks (AEO) during 2001. No radionuclides were released from the sites during 2001. The sites maintain two major environmental programs: waste management, and environmental media and release management. These two programs encompass waste handling, storage, and disposal, waste minimization and pollution prevention, air quality emissions, surface-water discharges, groundwater impacts, industrial wastewater discharges, and spill control procedures. The Morgantown and Pittsburgh sites currently maintain complete monitoring programs for groundwater, stormwater discharge, laboratory wastewater discharge, and meteorological data. In addition, an annual air emissions inventory is prepared. A comprehensive Directives Program aimed at managing environmental, safety, health requirements, and risks was initiated in 1997, continued through subsequent years, and will be completed in 2003. The primary objective of the program is to identify and implement standards that will protect the health and safety of workers, public, and the environment. This program started with a careful and thorough analysis of risks confronting workers and the communities surrounding NETL sites. Following this analysis, requirements and best management practices were evaluated to determine how requirements could best be used to advance the mission of NETL. Teams of subject-matter experts analyzed the work assigned to determine potential hazards and identify ways to remove or control those hazards. In 2001, NETL developed or revised a series of directives in two major areas: safety analysis and review (SAR) processes, and integrated safety management (ISM) directives. SAR directives were issued for research and development (R&D) operations, support operations, and facilities. ISM directives were released on management processes, such as standards maintenance, performance measures, assessments, corrective actions, lessons-learned, and training. In conjunction with the Directives Program, the use of the voluntary environmental management system, ISO 14001, was evaluated. This includes the only international environmental management standard to which an entity can be certified. NETL is using the specifications and guidance from this standard to identify an effective environmental management system for the NETL sites. An outside consultant performed an environmental management system assessment (also referred to as an initial environmental review), as referenced in ISO 14004. The objective of the assessment was to determine the degree to which NETL's existing integrated safety management system (ISMS), safety analysis review system (SARS), and environmental management programs conformed with the ISO14001 Environmental Management System (EMS) standard and the United States Environmental Protection Agency's (EPA) Code of Environmental Management Principles. A performance measurement system continued to be maintained during 2001 to assist in evaluating how effectively activities at NETL meet mission-critical goals and how well missions and strategies are connected in the DOE strategic plan. This system also provides data to assist in gauging performance against the DOE critical success factors, that is, performance against technical objectives. Various environmental milestones can be tracked to completion, thus giving NETL measures by which to gauge the sites' goals of remaining in regulatory compliance and achieving best-in-class environmental performance.

National Energy Technology Laboratory

2002-10-01T23:59:59.000Z

357

Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site  

Office of Legacy Management (LM)

GJO-2000-177-TAR GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy Approved for public release; distribution is unlimited. GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Project Number UGW-511-0017-12-000 Document Number U0066302 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Document Number U0066302 Contents DOE/Grand Junction Office Ground Water Compliance Action Plan for Old Rifle, Colorado

358

DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 2  

SciTech Connect

The Hanford Site Integrated Stabilization Management Plan (SISMP) was developed in support of the US Department of Energy`s (DOE) Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Integrated Program Plan (IPP). Volume 1 of the SISMP identifies the technical scope and costs associated with Hanford Site plans to resolve concerns identified in DNFSB Recommendation 94-1. Volume 2 of the SISMP provides the Resource Loaded Integrated Schedules for Spent Nuclear Fuel Project and Plutonium Finishing Plant activities identified in Volume 1 of the SISMP. Appendix A provides the schedules and progress curves related to spent nuclear fuel management. Appendix B provides the schedules and progress curves related to plutonium-bearing material management. Appendix C provides programmatic logic diagrams that were referenced in Volume 1 of the SISMP.

Gerber, E.W.

1995-10-01T23:59:59.000Z

359

Site environmental report for calendar year 1994, Yucca Mountain Site, Nye County, Nevada.  

SciTech Connect

The Yucca Mountain Site Characterization office has established an environmental program to ensure that facilities are operated in order to protect, maintain, and restore environmental quality, minimize potential threats to the environment and the public, and comply with environmental policies and US DOE orders. The status of the environmental program has been summarized in this annual report to characterize performance, confirm compliance with environmental requirements, and highlight significant programs and efforts during CY 1994. Monitoring, archaeology, groundwater, ecosystems, tortoise conservation, waste minimization, etc., are covered.

NONE

1995-06-01T23:59:59.000Z

360

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20032008  

E-Print Network (OSTI)

of Energy (DOE) to characterize one site, at Yucca Mountain in Nevada, to determine its suitability for constructing a repository at Yucca Mountain. As a result, the DOE plans to prepare and submit an application) gaining a better understanding of the potential behavior of a Yucca Mountain repository; (b) developing

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

362

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

363

Nevada Test Site annual site environmental report for calendar year 1998  

SciTech Connect

Prior to 1989, annual reports of environmental monitoring and assessment results for the Nevada Test Site (NTS) were prepared in two separate parts. Onsite effluent monitoring and environmental monitoring results were reported in an onsite report prepared by the US Department of Energy, Nevada Operations Office (DOE/NV). Results of the Offsite Radiological Surveillance and Long-Term Hydrological Monitoring Programs conducted by the US Environmental Protection Agency's (EPA) Laboratory (various names) in Las Vegas, Nevada, were reported separately by that Agency. Beginning with the 1989 Annual Site Environmental Report for the NTS, these two documents were combined into a single report to provide a more comprehensive annual documentation of the environmental protection activities conducted for the nuclear testing program and other nuclear and non-nuclear operations at the NTS. The two agencies have coordinated preparation of this tenth combined onsite and offsite report through sharing of information on environmental surveillance and releases as well as meteorological, hydrological, and other supporting data used in dose-estimation calculations.

Black, S.C.; Townsend, Y.E.

1999-10-01T23:59:59.000Z

364

Nevada Test Site Annual Site Environmental Report for Calendar Year - 1999  

SciTech Connect

Prior to 1989, annual reports of environmental monitoring and assessment results for the Nevada Test Site (NTS) were prepared in two separate parts. Onsite effluent monitoring and environmental monitoring results were reported in an onsite report prepared by the U.S. Department of Energy, Nevada Operations Office (DOE/NV). Results of the Offsite Radiological Surveillance and Long-Term Hydrological Monitoring programs conducted by the U.S. Environmental Protection Agency's (EPA's) Laboratory (various names) in Las Vegas, Nevada, were reported separately by that Agency. Beginning with the 1989 Annual Site Environmental Report for the NTS, these two documents were combined into a single report to provide a more comprehensive annual documentation of the environmental protection activities conducted for the nuclear testing program and other nuclear and non-nuclear operations at the NTS. The two agencies have coordinated preparation of this eleventh combined onsite and offsite report through sharing of information on environmental surveillance and releases as well as meteorological, hydrological, and other supporting data used in dose-estimation calculations.

Townsend, Y.E.; Grossman, R.F.

2000-10-01T23:59:59.000Z

365

Long-term surveillance plan for the Canonsburg, Pennsylvania, disposal site  

SciTech Connect

This document establishes elements of the US Department of Energy`s (DOE) Long-Term Surveillance Plan for the Canonsburg, Pennsylvania, disposal site. The US Nuclear Regulatory Commission (NRC) will use this plan in support of license issuance for the long-term surveillance of the Canonsburg site. The Canonsburg (CAN) site is located within the borough of Canonsburg, Washington County, in southwestern Pennsylvania. The Canonsburg site covers approximately 30 acres (74 hectares). The disposal cell contains approximately 226,000 tons (241,000 tons) of residual radioactive material (RRM). Area C is southeast of the Canonsburg site, between Strabane Avenue and Chartiers Creek. Contaminated soils were removed from Area C during the remedial action, and the area was restored with uncontaminated fill material.After this cleanup, residual quantities of thorium-230 were detected at several Area C locations. The remedial action plan did not consider the ingrowth of radium-226 from thorium-230 as part of the Area C cleanup, and only two locations contained sufficient thorium-230 concentrations to result in radium-226 concentrations slightly above the US Environmental Protection Agency (EPA) standards.

NONE

1995-10-01T23:59:59.000Z

366

DOE OIG Strategic Plan Fiscal Years 2009 - 2013 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

9 - 2013 9 - 2013 DOE OIG Strategic Plan Fiscal Years 2009 - 2013 U.S. Department of Energy Office of Inspector General, Strategic Plan, Fiscal Years 2009 - 2013 This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and performance of the Department's programs and operations. As OIG implements this Strategic Plan, our objective is to continue to play a critical role in protecting and preserving the Department's assets and resources. OIG will focus on mitigating those management challenges facing the Department through continued collaboration and cooperation with the Secretary and Department senior management. An equally important goal is aggressively exercising our

367

Long-term surveillance plan for the Mexican Hat Disposal Site, Mexican Hat, Utah  

SciTech Connect

This plan describes the long-term surveillance activities for the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site at Mexican Hat, Utah. The U.S. Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This long-term surveillance plan (LTSP) was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive material (RRM). This LTSP (based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program), documents the land ownership interests and details how the long-term care of the disposal site will be accomplished.

NONE

1996-02-01T23:59:59.000Z

368

Landlord project multi-year program plan, fiscal year 1999, WBS 1.5  

SciTech Connect

The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste, electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.

Dallas, M.D.

1998-09-22T23:59:59.000Z

369

Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.  

SciTech Connect

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.

Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

2001-09-01T23:59:59.000Z

370

Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado  

SciTech Connect

This long-term surveillance plan (LTSP) for the Durango, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Durango (Bodo Canyon) disposal site, which will be referred to as the disposal site throughout this document. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). RRMs include tailings and other uranium ore processing wastes still at the site, which the DOE determines to be radioactive. This LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992).

Not Available

1994-03-01T23:59:59.000Z

371

11 Navy sites to save $871,000 yearly | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Navy sites to save $871,000 yearly 1 Navy sites to save $871,000 yearly 11 Navy sites to save $871,000 yearly July 13, 2010 - 6:12pm Addthis Joshua DeLung What does this project do? The solar energy systems are expected to generate 9,399 MWh of clean, renewable energy during first full year after construction. The solar and roofing upgrades that will save the Navy $871,935 annually. The process will involve hundreds workers across the projects. 32 buildings in Florida, Mississippi and Texas to receive energy upgrades Up to 275 subcontractors to work on roofing and solar projects 9,399 MWh of energy expected to be generated in first full year after construction The U.S. Navy's Naval Facilities Engineering Command (NAVFAC) Southeast - based in Jacksonville, Fla. - is using $69.3 million in funding from the

372

WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002  

SciTech Connect

This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning for cleanup of waste in the plutonium purification cell (south) and extraction cell number 2 in the main plant; (10) ongoing characterization of facilities such as the waste tank farm and process cells; (11) monitoring the environment and managing contaminated areas within the Project facility premises; and (12) flushing and rinsing HLW solidification facilities.

NONE

2003-09-12T23:59:59.000Z

373

AGENDA for Review of NSTX 5 Year Plan for 2009-2013 July 28-30, 2008  

E-Print Network (OSTI)

AGENDA for Review of NSTX 5 Year Plan for 2009-2013 July 28-30, 2008 Conference Room LSB-B318, PPPL session) 1:30PM Chair, Panel Debriefing from 5-year plan review committee (open) 2:30PM Adjourn #12; Agenda and plan, panel member introduction 9:30AM Jon Menard Overview of NSTX Research Program for 2009

Princeton Plasma Physics Laboratory

374

Fiscal Year 2005 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada  

SciTech Connect

The Performance Assessment (PA) maintenance plan requires an annual review to determine if current operations and conditions at the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) remain consistent with PA and composite analysis (CA) assumptions and models. This report summarizes the fiscal year (FY) 2005 annual review findings for the Area 3 RWMS PA only. The PA Maintenance Plan states that no annual review or summary reporting will be carried out in years that a PA or CA revision is undertaken (Bechtel Nevada [BN], 2002). Updated PA results for the Area 5 RWMS were published in an addendum to the Area 5 RWMS PA report in September 2005. A federal review of the draft addendum report took place in early FY 2006 (October November 2005). The review team found the addendum acceptable without conditions. The review team's recommendation will be presented to the Low-Level Waste Disposal Facility Federal Review Group in early 2006. The addendum was revised in January 2006 and incorporated comments from the review team (BN, 2006). Table 1 summarizes the updated Area 5 RWMS PA results presented in the addendum.

Vefa Yucel

2006-01-01T23:59:59.000Z

375

Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2  

SciTech Connect

The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

Jacobsen, P.H.

1997-09-23T23:59:59.000Z

376

Tank waste remediation system fiscal year 1998 multi-year work plan WBS 1.1  

SciTech Connect

The TWRS Project Mission is to manage and immobilize for disposal the Hanford Site radioactive tank waste and cesium (Cs)/strontium (Sr) capsules in a safe, environmentally sound, and cost-effective manner. The scope includes all activities needed to (1) resolve safety issues; (2) operate, maintain, and upgrade the tank farms and supporting infrastructure; (3) characterize, retrieve, pretreat, and immobilize the waste for disposal and tank farm closure; and (4) use waste minimization and evaporation to manage tank waste volumes to ensure that the tank capacities of existing DSTs are not exceeded. The TWRS Project is responsible for closure of assigned operable units and D&D of TWRS facilities.

Lenseigne, D.L., Westinghouse Hanford, Richland, WA

1997-09-15T23:59:59.000Z

377

Long-term surveillance plan for the Maybell, Colorado Disposal Site  

SciTech Connect

This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Maybell disposal site in Moffat County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Maybell disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination that remedial action is complete for the Maybell site and the NRC formally accepts this LTSP. This document describes the long-term surveillance program the DOE will implement to ensure the Maybell disposal site performs as designed. The program is based on site inspections to identify threats to disposal cell integrity. The LTSP is based on the UMTRA Project long-term surveillance program guidance document and meets the requirements of 10 CFR {section}40.27(b) and 40 CFR {section}192.03.

NONE

1997-12-01T23:59:59.000Z

378

Long-term surveillance plan for the Maybell, Colorado Disposal Site  

SciTech Connect

This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Maybell disposal site in Moffat County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Maybell disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination that remedial action is complete for the Maybell site and the NRC formally accepts this LTSP. This document describes the long-term surveillance program the DOE will implement to ensure the Maybell disposal site performs as designed. The program is based on site inspections to identify threats to disposal cell integrity. The LTSP is based on the UMTRA Project long-term surveillance program guidance document and meets the requirements of 10 CFR {section}40.27(b) and 40 CFR {section}192.03.

NONE

1997-09-01T23:59:59.000Z

379

Long-term surveillance plan for the South Clive Disposal Site, Clive, Utah  

SciTech Connect

This long-term surveillance plan (LTSP) describes the US Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project South Clive disposal site in Clive, Utah. The US Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CRF Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the South Clive disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination of completion of remedial action for the South Clive site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the South Clive disposal site performs as designed. The program`s primary activity is site inspections to identify threats to disposal cell integrity.

NONE

1996-03-01T23:59:59.000Z

380

Summary of the Hanford Site environmental report for calendar year 1994  

SciTech Connect

This report summarizes the 390-page Hanford Site Environmental Report for Calendar Year 1994. The Hanford Site Environmental Report is prepared annually to review and document environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations. The report also highlights major environmental programs and efforts and is written to meet both the reporting requirements and guidelines of the US Department of energy (DOE) and the needs of the public. This report includes information on important Hanford Site compliance issues, environmental monitoring programs and results, and general information on the Site and the surrounding area.

Hanf, R.W.; Schrempf, R.E.; Dirkes, R.L. [eds.] [comps.

1996-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Hanford Site Black-Tailed Jackrabbit Monitoring Report for Fiscal Year 2013  

SciTech Connect

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, DOE/EIS-0222-F) which is the Environmental Impact Statement for Hanford Site activities, helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with NEPA.

Lindsey, Cole T.; Nugent, John J.; Wilde, Justin W.; Johnson, Scott J.

2014-02-13T23:59:59.000Z

382

Nevada test site annual site environmental report for calendar year 1995  

SciTech Connect

Monitoring and surveillance on and around the Nevada Test Site (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1995 indicated that operations on the NTS were conducted in compliance with applicable federal and DOE regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of effluents, or resuspension was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act (NEPA) is being achieved and, where mandated, permits for air and water effluents and waste management have been obtained from the appropriate agencies. Cooperation with other agencies has resulted in seven different consent orders and agreements. Support facilities at off-NTS locations complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

NONE

1996-09-01T23:59:59.000Z

383

Nevada Test Site annual site environmental report for calendar year 1997  

SciTech Connect

Monitoring and surveillance, on and around the Nevada Test Site, (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1997, indicated that operations on the NTS were conducted in compliance with applicable DOE, state, and federal regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of liquid effluents, or resuspension of soil was not detectable offsite, and exposure above existing background to members of the offsite population was not measured by the offsite monitoring program. Using the US Environmental Protection Agency`s (EPA`s) Clean Air Package 1988 (CAP88)-PC model and NTS radionuclide emissions and environmental monitoring data, the calculated effective dose equivalent (EDE) to the maximally exposed individual offsite would have been 0.089 mrem. Hazardous wastes were shipped offsite to approved disposal facilities.

Black, S.C.; Townsend, Y.E. [eds.

1998-10-01T23:59:59.000Z

384

Maintenance Assessment Plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAINTENANCE MAINTENANCE Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of

385

Nevada Test Site annual site environmental report for calendar year 1996  

SciTech Connect

Monitoring and surveillance on and around the Nevada Test Site (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1996 indicated that operations on the NTS were conducted in compliance with applicable DOE, state, and federal regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of liquid effluents, or resuspension of soil was not detectable offsite, and exposure above background to members of the offsite population was not measured by the offsite monitoring program. Using the US Environmental Protection Agency`s (EPA) Clean Air Package 1988 (CAP88)PC model and NTS radionuclide emissions and environmental monitoring data, the calculated effective dose equivalent (EDE) to the maximally exposed individual offsite would have been 0.11 mrem. This value is less than 2 percent of the federal dose limit prescribed for radionuclide air emissions. Any person receiving this dose would also have received 144 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act (NEPA) is being achieved and, where mandated, permits for air and water effluents and waste management have been obtained from the appropriate agencies. Cooperation with other agencies has resulted in seven different consent orders and agreements. Support facilities at off-NTS locations have complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits as mandated for each location.

Black, S.C.; Townsend, Y.E. [eds.

1997-10-01T23:59:59.000Z

386

Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska  

SciTech Connect

This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e disposal of contaminated waste. The results of this evaluation will be presented in a subsequent corrective action decision document.

DOE /NV

2001-03-12T23:59:59.000Z

387

Waste management project fiscal year 1998 multi-year work plan WBS 1.2  

SciTech Connect

The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

Slaybaugh, R.R.

1997-08-29T23:59:59.000Z

388

Wayne Interim Storage Site annual environmental report for calendar year 1991, Wayne, New Jersey. [Wayne Interim Storage Site  

SciTech Connect

This document describes the envirormental monitoring program at the Wayne Interim Storage Site (WISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of WISS and surrounding area began in 1984 when Congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. WISS is a National Priorities List site. The environmental monitoring program at WISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium concentrations in surface water, sediment, and groundwater. Several nonradiological parameters are also measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides, dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

none,

1992-09-01T23:59:59.000Z

389

Strategic plan for oil shale siting reresearch. Proceedings of a planning exercise, November 4-5, 1985, Denver, Colorado  

SciTech Connect

A strategic planning exercise on environmental research and policy to guide oil shale development was held in November 1985. Seventeen participants representing a cross section of interests and technical disciplines identified, from almost 200 suggested issues, 13 strategic issues in four general categories: policy, source characterization and pollutant generation, transport and impact, and risk assessment. The group reached a consensus on the technical objective for each issue and recommendations to address the objective. Each participant has at least several years' experience in some phase of oil shale endeavor. Therefore, a consensus from this group can be a valuable guide for agencies seeking to develop the oil shale resource while also protecting the environment and public health. This document is an attempt to concisely state the issues discussed by the group and thereby serve as a planning guide for oil shale environmental research.

Hinman, G.; Barr, S.; Peterson, E.J.; Williams, M.D. (eds.)

1986-07-01T23:59:59.000Z

390

Hanford Site waste minimization and pollution prevention awareness program plan. Revision 1  

SciTech Connect

The Hanford Site WMin/P2 program is an organized, comprehensive, and continual effort to systematically reduce the quantity and toxicity of hazardous, radioactive, mixed, and sanitary wastes; conserve resources; and prevent or minimize pollutant releases to all environmental media from all Site activities. The Hanford Site WMin/P2 program plan reflects national and DOE waste minimization and pollution prevention goals and policies, and represents an ongoing effort to make WMin/P2 part of the Site operating philosophy. In accordance with these policies, a hierarchical approach to environmental management has been adopted and is applied to all types of polluting and waste generating activities. Pollution prevention and waste minimization through source reduction are first priority in the Hanford WMin/P2 program, followed by environmentally safe recycling. Treatment to reduce the quantity, toxicity, and/or mobility will be considered only when prevention or recycling are not possible or practical. Environmentally safe disposal is the last option.

Not Available

1994-05-01T23:59:59.000Z

391

Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program  

SciTech Connect

This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, {approximately} 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner.

Not Available

1994-06-01T23:59:59.000Z

392

Long-term surveillance plan for the Tuba City, Arizona disposal site  

SciTech Connect

This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site at Tuba City, Arizona, describes the site surveillance activities. The U.S. Department of Energy (DOE) will carry out these activities to ensure the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) (10 CFR {section}40.27).

NONE

1996-02-01T23:59:59.000Z

393

300 Area Integrated Field-Scale Subsurface Research Challenge (IFRC) Field Site Management Plan  

SciTech Connect

Pacific Northwest National Laboratory (PNNL) has established the 300 Area Integrated Field-Scale Subsurface Research Challenge (300 Area IFRC) on the Hanford Site in southeastern Washington State for the U.S. Department of Energys (DOE) Office of Biological and Environmental Research (BER) within the Office of Science. The project is funded by the Environmental Remediation Sciences Division (ERSD). The purpose of the project is to conduct research at the 300 IFRC to investigate multi-scale mass transfer processes associated with a subsurface uranium plume impacting both the vadose zone and groundwater. The management approach for the 300 Area IFRC requires that a Field Site Management Plan be developed. This is an update of the plan to reflect the installation of the well network and other changes.

Freshley, Mark D.

2008-12-31T23:59:59.000Z

394

Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado: Final report  

SciTech Connect

This volume contains Appendix F, bid schedule and specifications for remedial action on three sites: Old Rifle processing site; New Rifle processing site and Estes Gulch disposal site.

Not Available

1992-02-01T23:59:59.000Z

395

Ground-water monitoring compliance plan for the Hanford Site Solid Waste Landfill  

SciTech Connect

Washington state regulations required that solid waste landfill facilities have ground-water monitoring programs in place by May 27, 1987. This document describes the well locations, installation, characterization studies and sampling and analysis plan to be followed in implementing the ground-water monitoring program at the Hanford Site Solid Waste Landfill (SWL). It is based on Washington Administrative Code WAC 173-304-490. 11 refs., 19 figs., 4 tabs.

Fruland, R.M.

1986-10-01T23:59:59.000Z

396

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2008 Activities and Achievements  

E-Print Network (OSTI)

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2008 Activities--Institute for Telecommunication Sciences In response to the: Technology Transfer and Commercialization Act of 2000 (P.L. 106 (FY) 2008. At the Department of Commerce, technology transfer is a significant part of the mission

Perkins, Richard A.

397

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2011 Activities and Achievements  

E-Print Network (OSTI)

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2011 Activities Pursuant to the Technology Transfer Commercialization Act of 2000 (Pub. L. 106-404) January 2012 #12;ii This page is intentionally left blank FOREWORD This report summarizes technology transfer activities

Perkins, Richard A.

398

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network (OSTI)

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Tourism Recreation Group Leadership 3 RPTM 26060 Introduction to Global Tourism 3 Offered in fall only HM 13024 Fulfills domestic diversity requirement; offered in fall only RPTM 36060 Commercial Recreation and Tourism

Sheridan, Scott

399

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network (OSTI)

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Tourism Introduction to Global Tourism 3 Offered in fall only HM 13024 Introduction to Hospitality Management 2 US; offered in fall only RPTM 36060 Commercial Recreation and Tourism 3 Offered in fall only RPTM 36075

Sheridan, Scott

400

The iCons Four Year Curriculum Plan Contact: iCons@cns.umass.edu  

E-Print Network (OSTI)

The iCons Four Year Curriculum Plan Contact: iCons@cns.umass.edu Website: http://www.cns.umass.edu/icons-program/ Fall 2012 (Version 11/5/2012) The Program areas of Renewable Energy and Biomedicine. iCons does not replace a major

Auerbach, Scott M.

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

U.S. Nuclear Waste Technical Review Board Fiscal Year 2002-2007 Strategic Plan  

E-Print Network (OSTI)

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Fiscal Year 2002-2007 Strategic Plan Statement of the Chairman The U.S. Nuclear Waste Technical Review Board was established of Energy Mission The Board's mission, established in the Nuclear Waste Policy Amendments Act (NWPAA

402

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20042009  

E-Print Network (OSTI)

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2004­2009 (Revised March 2004) Statement of the Board The Nuclear Waste Policy Amendments Act of 1987 directed the U-level radioactive waste. The Act also established the U.S. Nuclear Waste Technical Review Board as an indepen dent

403

B.A. Master of Architecture Plan (173 credits) Year 1 (32-33 credits)  

E-Print Network (OSTI)

B.A. ­ Master of Architecture Plan (173 credits) Year 1 (32-33 credits) Fall (16 credits) Spring (16-17 credits) ARCH 103 Introduction to Architecture (3) BDS 102 Thinking & Making Studio II (3) ARCH Culture of Building Technology (3) ARCH 630 Theory & Context (3) ARCH 530 Environmental Systems I (3

404

Standard 4-Year Course Plan for Computer Science & Engineering under Core 2009 Fall Winter Spring  

E-Print Network (OSTI)

Standard 4-Year Course Plan for Computer Science & Engineering under Core 2009 Fall Winter Spring Engineering Elective Computer Engineering Elective Computer Engineering Elective Fall Winter Spring University Programming COEN 12 ­ Data Structures Freshman ENGR 1 ­ Introduction to Engineering (1 unit) Fall Winter

Holliday, JoAnne

405

EIS-0380: Annual Mitigation Action Plan Annual Report  

Energy.gov (U.S. Department of Energy (DOE))

Los Alamos National Laboratory Site-Wide Environmental Impact Statement Fiscal Year 2013 Mitigation Action Plan Annual Report

406

A Critique of the August 9th Weldon Spring Site Stewardship Plan:  

Office of Legacy Management (LM)

Critique of the August 9th Weldon Spring Site Stewardship Plan: Critique of the August 9th Weldon Spring Site Stewardship Plan: "Long Term Surveillance and Maintenance Program Long-Term Stewardship Plan for the Weldon Spring, Missouri, Site" August 9, 2002 (GJO-2002-342-TAC; GJO-LWEL 1.1-1) Author: Daniel W. McKeel, Jr., M.D. 5587-C Waterman Blvd. St. Louis, MO 63112 Phone: (314) 367-8888 Fax: (314) 362-4096 Analysis 8/20-22/2002 This critique was written from a copy downloaded from the web. The URL was supplied in an announcement of document availability letter DWM received August 10, 2002. A written copy was requested by letter 8/16/02. Not received as of 8/20/02. This comments narrative was based on the web version. On 8/06/02, 8/16/02 and 8/23/02 Dan McKeel requested in writing and via e-mail to be

407

Annual Site Environmental Report of the Lawrence Berkeley Laboratory, Calendar year 1992  

SciTech Connect

This Annual Site Environmental Report summarizes LBL environmental activities in calendar year (CY) 1992. The purpose of this Report is to present summary environmental information in order to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. Its format and content are consistent with the requirements of the US Department of Energy (DOE) Order 5400.1, ``General Environmental Protection Program.``

Balgobin, D.A.; Javandel, I.; Pauer, R.O.; Schleimer, G.E.; Thorson, P.A. [eds.

1993-05-01T23:59:59.000Z

408

Long-term surveillance plan for the Lowman, Idaho, Disposal site. Revision 1  

SciTech Connect

The long-term surveillance plan (LTSP) for the Lowman, Idaho, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Lowman disposal site, which will be referred to as the Lowman site throughout this document. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. The radioactive sands at the Lowman site were stabilized on the site. This final LTSP is being submitted to the US Nuclear Regulatory Commission (NRC) as a requirement for issuance of a general license for custody and long-term care for the disposal site. The general license requires that the disposal cell be cared for in accordance with the provisions of this LTSP. The LTSP documents whether the land and interests are owned by the United States or a state, and describes, in detail, how the long-term care of the disposal site will be carried out through the UMTRA Project long-term surveillance program. The Lowman, Idaho, LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program, (DOE, 1992).

Not Available

1994-04-01T23:59:59.000Z

409

Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado. Revision 1  

SciTech Connect

This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Act on (UMTRA) Project Bodo Canyon disposal site at Durango, Colorado, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal call continues to function as designed This LTSP was prepared as a requirement for DOE acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) from processing uranium ore. This LTSP documents that the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a). Following the introduction, contents of this report include the following: site final condition; site drawings and photographs; permanent site surveillance features; ground water monitoring; annual site inspections; unscheduled inspections; custodial maintenance; corrective action; record keeping and reporting requirements; emergency notification and reporting; quality assurance; personal health and safety; list of contributions; and references.

NONE

1995-11-01T23:59:59.000Z

410

Niagara Falls Storage Site annual environmental report for calendar year 1991, Lewiston, New York. [Niagara Falls Storage Site  

SciTech Connect

This document describes the environmental monitoring program at the Niagara Falls Storage Site (NFSS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring at NFSS began in 1981. The site is owned by the US Department of Energy (DOE) and is assigned to the DOE Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at NFSS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium and radium-226 concentrations in surface water, sediments, and groundwater. Additionally, several nonradiological parameters including seven metals are routinely measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

Not Available

1992-09-01T23:59:59.000Z

411

Legend and legacy: Fifty years of defense production at the Hanford Site  

SciTech Connect

Today, the Hanford Site is engaged in the largest waste cleanup effort ever undertaken in human history. That in itself makes the endeavor historic and unique. The Hanford Site has been designated the ``flagship`` of Department of Energy (DOE) waste remediation endeavors. And, just as the wartime Hanford Project remains unmatched in history, no counterpart exists for the current waste cleanup enterprise. This report provides a summary of the extensive historical record, however, which does give a partial road map. The science of environmental monitoring pioneered at the Hanford Site, and records of this type are the most complete of any in the world, from private companies or public agencies, for the early years of Site operations. The Hanford Site was unique for establishing a detailed, scientific, and multi-faceted environmental monitoring program.

Gerber, M.S.

1992-09-01T23:59:59.000Z

412

Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002)  

SciTech Connect

Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities will focus on the surface/shallow subsurface sampling and deep subsurface modeling. Suspected potential contaminants of concern for investigative analysis at the Gasbuggy Site include total petroleum hydrocarbons (diesel- and gasoline-range), volatile organic compounds, semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and radionuclides. The results of this characterization and risk assessment will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-site disposal of contaminated waste which will be presented in a subsequent corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

2002-01-25T23:59:59.000Z

413

Supplemental Investigation Plan for FFACO Use Restrictions, Nevada Test Site, Nevada, Revision 0  

SciTech Connect

This document is part of an effort to re-evaluate all FFACO URs against the current RBCA criteria (referred to in this document as the Industrial Sites [IS] RBCA process) as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006a). After reviewing all of the existing FFACO URs, the 12 URs addressed in this Supplemental Investigation Plan (SIP) could not be evaluated against the current RBCA criteria as sufficient information about the contamination at each site was not available. This document presents the plan for conducting field investigations to obtain the needed information. This SIP includes URs from Corrective Action Units (CAUs) 326, 339, 358, 452, 454, 464, and 1010, located in Areas 2, 6, 12, 19, 25, and 29 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada; and CAU 403, located in Area 3 of the Tonopah Test Range, which is approximately 165 miles north of Las Vegas, Nevada.

Lynn Kidman

2008-02-01T23:59:59.000Z

414

Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)  

SciTech Connect

During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs.

Not Available

1987-06-01T23:59:59.000Z

415

Energy-water analysis of the 10-year WECC transmission planning study cases.  

SciTech Connect

In 2011 the Department of Energy's Office of Electricity embarked on a comprehensive program to assist our Nation's three primary electric interconnections with long term transmission planning. Given the growing concern over water resources in the western U.S. the Western Electricity Coordinating Council (WECC) requested assistance with integrating water resource considerations into their broader electric transmission planning. The result is a project with three overarching objectives: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western Interconnection to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Western States Water Council (WSWC) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and WSWC. The foundation for the Energy-Water DSS is Sandia National Laboratories Energy-Power-Water Simulation (EPWSim) model (Tidwell et al. 2009). The modeling framework targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. This framework provides an interactive environment to explore trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., state, county, watershed, interconnection). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. The framework currently supports modules for calculating water withdrawal and consumption for current and planned electric power generation; projected water demand from competing use sectors; and, surface and groundwater availability. WECC's long range planning is organized according to two target planning horizons, a 10-year and a 20-year. This study supports WECC in the 10-year planning endeavor. In this case the water implications associated with four of WECC's alternative future study cases (described below) are calculated and reported. In future phases of planning we will work with WECC to craft study cases that aim to reduce the thermoelectric footprint of the interconnection and/or limit production in the most water stressed regions of the West.

Tidwell, Vincent Carroll; Passell, Howard David; Castillo, Cesar; Moreland, Barbara

2011-11-01T23:59:59.000Z

416

Welding Cutting and Brazing Assessment Plan Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WELDING, CUTTING AND BRAZING WELDING, CUTTING AND BRAZING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: This assessment is to verify hot work requirements associated with welding, cutting, burning, brazing, grinding and other spark- or flame-producing operations have been implemented. Verify that the requirements implemented are appropriate for preventing loss of life and property from fire, and personal injury from contact with or exposure to molten metals, vapors, radiant energy, injurious rays and sparks. Criteria: Establish designated area in which routine and repetitive welding, cutting, and other spark- or flame producing operations are conducted [1910.252(a)(2)(iv),1910.252(a)(2)(vi)(A), 1910.252(a)(2)(xv), General Requirements].

417

Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas  

SciTech Connect

This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project Falls City disposal site, Falls City, Texas, describes the surveillance activities for the disposal site. DOE will carry out these activities to ensure that the disposal cell continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials. This LTSP documents whether the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a).

NONE

1995-06-01T23:59:59.000Z

418

Long-term Surveillance Plan for the Falls City Disposal Site, Falls City, Texas. Revision 1  

SciTech Connect

This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project Falls City disposal site, Falls City, Texas, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials. This LTSP documents whether the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a).

NONE

1995-08-01T23:59:59.000Z

419

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 3.9 Market Transformation  

Energy.gov (U.S. Department of Energy (DOE))

Market Transformation technical plan section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated July 2013. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

420

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 3.6 Technology Validation  

Energy.gov (U.S. Department of Energy (DOE))

Technology Validation technical plan section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated July 2013. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 3.1 Hydrogen Production  

Energy.gov (U.S. Department of Energy (DOE))

Hydrogen Production technical plan section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated October 2014. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

422

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 3.5 Manufacturing R&D  

Energy.gov (U.S. Department of Energy (DOE))

Manufacturing R&D technical plan section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated October 2014. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

423

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 3.8 Education and Outreach  

Energy.gov (U.S. Department of Energy (DOE))

Education and Outreach technical plan section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration (MYRD&D) Plan; updated July 2013. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

424

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 3.2 Hydrogen Delivery  

Energy.gov (U.S. Department of Energy (DOE))

Hydrogen Delivery technical plan section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated October 2014. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

425

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 3.3 Hydrogen Storage  

Energy.gov (U.S. Department of Energy (DOE))

Hydrogen Storage technical plan section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated October 2014. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

426

Portsmouth Site Closes a Busy Year with Several D&D Project Completions |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth Site Closes a Busy Year with Several D&D Project Portsmouth Site Closes a Busy Year with Several D&D Project Completions Portsmouth Site Closes a Busy Year with Several D&D Project Completions December 24, 2013 - 12:00pm Addthis Workers have removed more than 25 percent of the process gas equipment from the X-326 facility since starting that work in 2012. This past year they removed 54 of 200 cells. Once the equipment is removed, the 30-acre building will be ready for demolition. Workers have removed more than 25 percent of the process gas equipment from the X-326 facility since starting that work in 2012. This past year they removed 54 of 200 cells. Once the equipment is removed, the 30-acre building will be ready for demolition. Built in 1953, the PORTS X-102 Cafeteria was a 19,000-square-foot building that served as a gathering spot for employees over the years. Age caught up with the building and it was closed in 2012. Demolition of the structure was completed the week of Aug. 19, eight days ahead of schedule.

427

Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 2, Part A: Chapters 3, 4, and 5  

SciTech Connect

This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1--5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 575 refs., 84 figs., 68 tabs.

NONE

1988-12-01T23:59:59.000Z

428

Argonne National Laboratory-East site environmental report for calendar year 1995  

SciTech Connect

This report presents the environmental report for the Argonne National Laboratory-East for the year of 1995. Topics discussed include: general description of the site including climatology, geology, seismicity, hydrology, vegetation, endangered species, population, water and land use, and archaeology; compliance summary; environmental program information; environmental nonradiological program information; ground water protection; and radiological monitoring program.

Golchert, N.W.; Kolzow, R.G. [Environmental Management Operation, Argonne National Lab., IL (United States)

1996-09-01T23:59:59.000Z

429

Hanford Site near-facility environmental monitoring data report for calendar year 1998  

SciTech Connect

This document summarizes the results of the U.S. Department of Energy's Near-Facility Environmental Monitoring program conducted by Waste Management Federal Services of Hanford, Inc. for Fluor Daniel Hanford, Inc. for 1998 in the 100,200/600, and 300/400 Areas of the Hanford Site, in southcentral Washington State. Surveillance activities included sampling and analyses of ambient air, surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with federal, state, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

DIEDIKER, L.P.

1999-07-29T23:59:59.000Z

430

Fiscal year 1991 report on archaeological surveys of the 100 Areas, Hanford Site, Washington  

SciTech Connect

In compliance with Section 106 of the National Historic Preservation Act (NHPA), and at the request of Westinghouse Hanford Company, the Hanford Cultured Resources Laboratory (HCRL) conducted an archaeological survey during FY 1991 of the 100-Area reactor compounds on the US Department of Energy's Hanford Site. This survey was conducted as part of a comprehensive resources review of 100-Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization activities. The work included a lite and records review and pedestrian survey of the project area following procedures set forth in the Hanford Cultural Resources Management Plan.

Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

1992-09-01T23:59:59.000Z

431

Fiscal year 1991 report on archaeological surveys of the 100 Areas, Hanford Site, Washington  

SciTech Connect

In compliance with Section 106 of the National Historic Preservation Act (NHPA), and at the request of Westinghouse Hanford Company, the Hanford Cultured Resources Laboratory (HCRL) conducted an archaeological survey during FY 1991 of the 100-Area reactor compounds on the US Department of Energy`s Hanford Site. This survey was conducted as part of a comprehensive resources review of 100-Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization activities. The work included a lite and records review and pedestrian survey of the project area following procedures set forth in the Hanford Cultural Resources Management Plan.

Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

1992-09-01T23:59:59.000Z

432

Record of Technical Change - Corrective Action Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Revision 0  

SciTech Connect

Record of Technical Change, Technical Change No. CAP-1, dated April 13, 2005 for Corrective Action Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Revision 0, September 2004, DOE/NV--1003.

U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office; Bechtel Nevada

2005-04-13T23:59:59.000Z

433

Comment and response document for the long-term surveillance plan for the Collins Ranch Disposal Site Lakeview, Oregon  

SciTech Connect

Twenty-nine comments from the US Nuclear Regulatory Commission and six from the Grand Junction Project Office for the long-term surveillance plan for the Collins Ranch Disposal Site, Lakeview, Oregon are documented along with their corresponding responses.

Not Available

1993-11-01T23:59:59.000Z

434

Research plan for integrated ecosystem and pollutant monitoring at remote wilderness study sites  

SciTech Connect

This research plan outlines an approach to the measurement of pollutants and ecosystem parameters at remote, high-elevation, wilderness study sites. A multimedia, systems approach to environmental monitoring is emphasized. The primary purpose of the research is to apply and field test a technical report entitled ''Guidelines for measuring the physical, chemical, and biological condition of wilderness ecosystems.'' This document intended to provide Federal Land Managers with information to establish environmental monitoring programs in wilderness areas. To date, this monitoring document has yet to be evaluated under rigorous field conditions at a remote, high-elevation Rocky Mountain site. For the purpose of field testing approaches to monitoring of pollutants and ecosystems in remote, wilderness areas, evaluation criteria were developed. These include useability, cost-effectiveness, data variability, alternative approaches, ecosystems conceptual approach, and quality assurance. Both the Forest Service and INEL environmental monitoring techniques will be evaluated with these criteria. Another objective of this research plan is to obtain an integrated data base on pollutants and ecosystem structure and function at a remote study site. The methods tested in this project will be used to acquire these data from a systems approach. This includes multimedia monitoring of air and water quality, soils, and forest, stream, and lake ecosystems. 71 refs., 1 fig., 9 tabs.

Bruns, D.A.; Wiersma, G.B.

1988-03-01T23:59:59.000Z

435

Overheads, Safety Analysis and Engineering FY 1995 Site Support Program Plan WBS 6.3.5  

SciTech Connect

The Safety Analysis & Engineering (SA&E) department provides core competency for safety analysis and risk documentation that supports achievement of the goals and mission as described in the Hanford Mission Plan, Volume I, Site Guidance (DOE-RL 1993). SA&E operations are integrated into the programs that plan and conduct safe waste management, environmental restoration, and operational activities. SA&E personnel are key members of task teams assigned to eliminate urgent risks and inherent threats that exist at the Hanford Site. Key to ensuring protection of public health and safety, and that of onsite workers, are the products and services provided by the department. SA&E will continue to provide a leadership role throughout the DOE complex with innovative, cost-effective approaches to ensuring safety during environmental cleanup operations. The SA&E mission is to provide support to direct program operations through safety analysis and risk documentation and to maintain an infrastructure responsive to the evolutionary climate at the Hanford Site. SA&E will maintain the appropriate skills mix necessary to fulfill the customers need to conduct all operations in a safe and cost-effective manner while ensuring the safety of the public and the onsite worker.

DiVincenzo, E.P.

1994-09-27T23:59:59.000Z

436

U.S. Department of Energy Clean Cities Five-Year Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy Clean Cities Five-Year Strategic Plan Reducing Petroleum Dependence in On-Road Transportation in the United States January 2011 Prepared by Cambridge Concord Associates Clean Cities Five-Year Strategic Plan, January 2011 1 Contents List of Abbreviations 3 Driving the Clean Cities Mission Forward 4 The Centrality of the Coalitions to the Success of the Clean Cities Mission 5 Executive Summary 5 Overarching Vision Maximize the Impact of Clean Cities 7 Strategic Direction Significantly Expand Clean Cities' Petroleum Reduction Efforts in the 8 Portfolio of Technologies Alternative Fuels - Electric Drive, Natural Gas, Propane Electric Drive 9 Natural Gas 13 Propane 17 Renewable Fuels - Renewable Natural Gas/Biomethane, Ethanol, Biodiesel

437

Operations Authorization Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Authorization Operations Authorization Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project. Criteria: Conditions and requirements should be established to ensure programs addressing all applicable functional areas are adequately implemented to support safe performance of the work. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work. Personnel shall be responsible and accountable for performance of work in accordance with the controls established. Controls established for safety are a discernible part of the plan for

438

Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee  

SciTech Connect

The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable waste management practices. The HASP is written to make use of past experience and best management practices to eliminate or minimize hazards to workers or the environment from events such as fires, falls, mechanical hazards, or any unplanned release to the environment.

Flynn, N.C. Bechtel Jacobs

2008-04-21T23:59:59.000Z

439

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0  

SciTech Connect

CAU 104 comprises the following corrective action sites (CASs): 07-23-03, Atmospheric Test Site T-7C 07-23-04, Atmospheric Test Site T7-1 07-23-05, Atmospheric Test Site 07-23-06, Atmospheric Test Site T7-5a 07-23-07, Atmospheric Test Site - Dog (T-S) 07-23-08, Atmospheric Test Site - Baker (T-S) 07-23-09, Atmospheric Test Site - Charlie (T-S) 07-23-10, Atmospheric Test Site - Dixie 07-23-11, Atmospheric Test Site - Dixie 07-23-12, Atmospheric Test Site - Charlie (Bus) 07-23-13, Atmospheric Test Site - Baker (Buster) 07-23-14, Atmospheric Test Site - Ruth 07-23-15, Atmospheric Test Site T7-4 07-23-16, Atmospheric Test Site B7-b 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.

Patrick Matthews

2012-10-01T23:59:59.000Z

440

5-Year Research Plan on Fine Particulate Matter in the Atmosphere  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Technology Laboratory Five Year Research Plan on Fine Particulate Matter in the Atmosphere FY2001-FY2005 NETL PM Research Program Ambient Sampling & Analysis Control Technology R&D Source Characterization Predictive Modeling -iii- TABLE OF CONTENTS Page I. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 A. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B. Outlook for PM and the Environment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 II. OVERVIEW OF THE PROGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 A. Program Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 B. Current Program Highlights . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 1. The Upper Ohio River Valley Project (UORVP) . . . . . . . . . . . . . . . . . . 13

Note: This page contains sample records for the topic "year site plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Repository sealing plan for the Nevada Nuclear Waste Storage Investigations Project, fiscal years 1984 through 1990  

SciTech Connect

This report presents a plan to develop acceptable sealing methods for a prospective nuclear waste repository in unsaturated tuff in Yucca Mountain, which is on and adjacent to the Nevada Test Site. Sealing is the permanent closure of the underground facility, shafts, ramps, and boreholes. Questiona associated with the performance of the sealing system form the basis for this plan. Tasks that contribute to the resolution of these questions and support the documentation required for the construction authorization application are proposed. The approach to answering the performance-related questions is divided into six steps: (1) assess the need for sealing, (2) define the design requirements, (3) measure the material properties, (4) assess the performance of sealing designs, (5) perform laboratory analyses and field testing, and (6) reassess the performance of sealing designs. Organization of the tasks supporting each step is illustrated by detailed work-flow diagrams.

Fernandez, J.A.

1985-02-01T23:59:59.000Z

442

St. Louis Airport site environmental report for calendar year 1989, St. Louis, Missouri  

SciTech Connect

The environmental monitoring program, which began in 1984, continued during 1989 at the St. Louis Airport Site (SLAPS) in St. Louis County, Missouri. SLAPS and its vicinity properties, including ditches north and south of the site, were designated for cleanup as part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a United States Department of Energy (DOE) program to identify and decontaminate or otherwise control sites where residual radioactive material remains from the early years of the nation's atomic energy program. The monitoring program at SLAPS measures radon concentrations in air; external gamma dose rates; and uranium, thorium, and radium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. To assess the potential effect of SLAPS on public health, the potential radiation dose was estimated for a hypothetical maximally exposed individual. This report presents the findings of the environmental monitoring program conducted at the St. Louis Airport Site (SLAPS) during calendar year 1989. 19 refs., 13 figs., 14 tabs.

Not Available

1990-05-01T23:59:59.000Z

443

Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update  

Energy.gov (U.S. Department of Energy (DOE))

This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

444

Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update-- Sections  

Energy.gov (U.S. Department of Energy (DOE))

This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

445

Bioenergy Technologies Office Multi-Year Program Plan: July 2014 Update  

Energy.gov (U.S. Department of Energy (DOE))

This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

446

Bioenergy Technologies Office Multi-Year Program Plan: July 2014 Update-- Sections  

Energy.gov (U.S. Department of Energy (DOE))

This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

447

Equipment and Piping Labeling Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EQUIPMENT AND PIPING LABELING EQUIPMENT AND PIPING LABELING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: To verify that facility equipment and piping are labeled in a manner such that facility personnel are able to positively identify equipment they operate. To ensure that an effective labeling program is in effect to reduce operator and maintenance errors from incorrect identification of equipment, to increase training effectiveness by tracing the actual facility system as opposed to tracing its schematic, and to reduce personnel exposure to radiation and hazardous materials. This assessment provides a basis for evaluating the effectiveness of the contractor's program for labeling equipment and piping and for establishing compliance

448

Configuration Management Assessment Plan - Developed By NNSA/Nevada Site Office Independent Oversight Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Configuration Management Configuration Management Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders. Criteria: The CM program supports DOE program implementation through the following: It provides the mechanisms for identifying, cataloging, and maintaining the design requirements and design basis (established to satisfy DOE O 420.1 Facility Safety).