Powered by Deep Web Technologies
Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne  

Science Conference Proceedings (OSTI)

OAK A271 Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne. This Annual Site Environmental Report (ASER) for 1999 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. This Annual Site Environmental Report provides information showing that there are no indications of any potential impact on public health and safety due to the operations conducted at the SSFL. All measures and calculations of off-site conditions demonstrate compliance with applicable regulations, which provide for protection of human health and the environment.

None

2000-09-01T23:59:59.000Z

2

Site Environmental Report for calendar year 1998, DOE operations at Rocketdyne Propulsion and Power  

SciTech Connect

This Annual Site Environmental Report for 1998 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL) and De Soto facilities. In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. Large-scale D and D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 1998 continue to indicate that there are no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, and direct radiation. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.

Rutherford, P.D. [ed.] [ed.

1999-09-22T23:59:59.000Z

3

Electric Vehicle Site Operator Program. Year 1 third quarter report, January 1, 1992--March 31, 1992  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.

Not Available

1992-06-01T23:59:59.000Z

4

DOE KSU EV Site Operator Program. Year 1, fourth quarter report, April 1--June 30, 1992  

SciTech Connect

Kansas State University, with funding from federal, state, public, and private companies, is participating in the DOE Electric Vehicle Site Operator Program. Kansas State is demonstrating, testing, and evaluating electric of hybrid vehicle technology. This will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four(4) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort station wagons. This quarter`s report describes ongoing public relations activities and meetings as well as presenting performance data for the electric vehicles. (GHH)

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1992-08-01T23:59:59.000Z

5

Superconducting Super Collider site environmental report for calendar year 1991. Pre-operational  

SciTech Connect

This is the first annual SER prepared for the SSC project. It is a pre-operational report, intended primarily to describe the baseline characterization of the Ellis County, Texas site that has been developed subsequent to the Environmental Impact Statement (EIS) and the Supplemental Environmental impact Statement (SEIS). As such, the emphasis will be on environmental compliance efforts, including monitoring and mitigation programs. The SER also reports on the measures taken to meet the commitments made in the EIS and SEIS. These measures are detailed in the Mitigation Action Plan (MAP) (Department of Energy (DOE), 1991), which was prepared following the signing of the Record of Decision (ROD) to construct the SSC in Texas. The SER will continue to be preoperational until the first high-energy (20 trillion electron volt or TeV) protons collisions are observed, at which point the SSC will become operational. At that time, the SER will place more emphasis on the radiological monitoring program. This SER will report on actions taken in 1991 or earlier and briefly mention some of those planned for calendar year 1992. AU actions completed in 1992 will be addressed in the SER for calendar year 1992.

NONE

1995-05-01T23:59:59.000Z

6

DOE/KEURP site operator program. Year 3, Second Quarter Report, October 1--December 31, 1993  

Science Conference Proceedings (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU has purchased several electric cars and proposes to purchase additional electric vehicles. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has procured two (2) Soleq 1993 Ford EVcort station wagons. During calendar year 1994, the Kansas` electric vehicle program expects to purchase a minimum of four and a maximum of eleven additional electric vehicles. The G-Van was signed in order for the public to be aware that it was an electric vehicle. Financial participants` names have been stenciled on the back door of the van. The Soleq EvCorts have not been signed. In order to demonstrate the technology as feasible, the EvCorts were deliberately not signed. The goal is to generate a public perception that this vehicle is no different from any similar internal combustion engine vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged.

Not Available

1993-12-31T23:59:59.000Z

7

Site operator program final report for fiscal years 1992 through 1996  

DOE Green Energy (OSTI)

The Site Operator Program was an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed at the Idaho National Engineering and Environmental Laboratory. The Program`s goals included the field evaluation of electric vehicles in real-world applications and environments; the support of electric vehicle technology advancement; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles. This report covers Program activities from 1992 to 1996. The Site Operator Program ended in September 1996, when it was superseded by the Field Operations Program. Electric vehicle testing included baseline performance testing, which was performed in conjunction with EV America. The baseline performance parameters included acceleration, braking, range, energy efficiency, and charging time. The Program collected fleet operations data on electric vehicles operated by the Program`s thirteen partners, comprising electric utilities, universities, and federal agencies. The Program`s partners had over 250 electric vehicles, from vehicle converters and original equipment manufacturers, in their operating fleets. Test results are available via the World Wide Web site at http://ev.inel.gov/sop.

Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Birasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

1998-01-01T23:59:59.000Z

8

Site Operator Program  

DOE Green Energy (OSTI)

Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

Warren, J.F.

1991-01-01T23:59:59.000Z

9

Site Operator Program  

DOE Green Energy (OSTI)

Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

Warren, J.F.

1991-12-31T23:59:59.000Z

10

DOE/KEURP Site Operator Program year 5 first quarter report, July 1-- September 30, 1995  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy` s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU now has two electric cars. Both are electric conversion vehicles from Soleq Corporation out of Chicago. KSU in conjunction with KEURP also initiated procurement for the purchase of four (4) Chevy S-10 pickup trucks. Since the supplier, GE-Spartan, canceled its effort concerning the production of vehicles other appropriate sources were sought. Today, K-State and the Kansas Utilities are working with Troy Design and Manufacturing (TDM), Redford, Michigan. TDM is working with Ford Motor Company and expects to become the first certified electric vehicle Quality Vehicle Modifier (QVM). Kansas State has entered into an agreement to assist TDM in supporting the infrastructure and technical manual development for these vehicles. The Soleq EVcorts have not been signed to illustrate to the public that it is an electric vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged. As soon as TDM`s Ford Ranger electric vehicles are delivered they will be used throughout the state by utility companies that are participating with K-State`s Site Operator Program.

NONE

1995-12-01T23:59:59.000Z

11

DOE/KEURP Site Operator Program. Year 2, Final report (fourth quarter), April--June 1993  

SciTech Connect

A second successful year has been completed of demonstrating and evaluating electric vehicle technology. The G-Van has begun to show signs of system failure (<10 miles/charge). The DSEP minivan remains idle. The Soleq vehicle performed well.

Hague, J.R.

1993-07-01T23:59:59.000Z

12

Kansas State University electric vehicle site operator program. Year 1, second quarter report, October 1, 1991--December 30, 1991  

DOE Green Energy (OSTI)

K-State is presently working with Grumman Allied and Unique Mobility to establish a working agreement for the research and development of a pure electric postal vehicle. K-State has worked on the design of this vehicle for the past year and is working to establish the appropriate consortium to bring this vehicle to commercial realization. K-State is working to establish infrastructure support for electric vehicles. Presently, a Kansas company is working with K-State to bring its patented low-cost vehicle metering product to market. An anticipated second year DOE project would provide 100 electric metering stations to Southern California for a large scale electric vehicle infrastructure demonstration project. This project would allow a parking lot(s) to be made EV ready. K-State`s Site Operator Program continues to get the ``word-out`` about electric vehicles. From a personal visit by Senator Bob Dole, to Corporate Board of Director Meetings, to school classrooms, to shopping mall demonstrations; K-State Employees are increasing public access and awareness about the electric vehicle industry. As has been shown in this report, K-State`s G-Van has logged an average eighteen miles per day while maintaining a full schedule of public relations tours within the state of Kansas and Missouri. K-State has now been contacted by companies in Nebraska and Iowa requesting information and involvement in this program. Kansas and Kansas State will continue its work to contribute to the Site Operator Program effort. With the purchase of two additional electric vehicles and the pending request to purchase two more electric vehicles during the next contractual year, K-states`s program will grow. When vehicle development plans and infrastructure requirements are solidified, K-State`s program will be ready to participate and be a major contributor to the development and introduction of this technology.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-12-31T23:59:59.000Z

13

Kansas State University Electric Vehicle Site Operator Program. Year 1: First quarter report, July 2, 1991--September 30, 1991  

SciTech Connect

During the past fifteen years Kansas State`s faculty has been involved in research of alternative fuel vehicles. From formulation of fuels and automotive fuel storage to development of electronic controls, K-State`s faculty research has been ongoing. With the increased awareness of what is occurring to the world`s environment, the catalyst -- to ensure applied results from faculty research will occur -- has been activated. The Department of Energy`s Electric Vehicle Site Operator Program is the platform being used to demonstrate international efforts to bring a more acceptable daily mode of transportation to our highways. The first new electrical vehicle procured at K-State in the last ten years, a G-Van, is a technological dinosaur. It does not incorporate leading edge control or drive systems nor does it provide the type of vehicle frame and body to meet a majority of the daily commuter needs required by the American market. Yet, this vehicle represents initial efforts to bring a federally crash certified vehicle to the commercial automotive market. As such, it is an evolutionary step in the mass production of electric vehicle products.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-12-31T23:59:59.000Z

14

Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report for July through September 1994 (Fourth quarter of fiscal year 1994)  

DOE Green Energy (OSTI)

The Site Operator Program was initially established by the Department of Energy (DOE) to incorporate the electric vehicle activities dictated by the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976. In the ensuing years, the Program has evolved in response to new legislation and interests. The Program currently includes twelve sites located in diverse geographic, metrologic, and metropolitan areas across the US. Information is shared reciprocally with a thirteenth site, not under Program contract. The vehicles are operator-owned, except for two Griffon vans. The Mission Statement of the Site Operator Program includes three major activities: advancement of electric vehicle technologies; development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles (EVs) by the public. The current participants in the Site Operator Program are shown. The ultimate thrust of program activities varies among sites, reflecting not only the Operator`s business interests but also geographic and climate-related operating conditions. This fourth quarter report (FY-94) includes a summary of activities from the previous three quarters. The report section sequence has been revised to provide a more easily seen program overview, and specific operator activities are now found in Appendix A.

Kiser, D.M.; Brown, H.L.

1995-03-01T23:59:59.000Z

15

Electric Vehicle Site Operator Program  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy's Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.

Not Available

1992-01-01T23:59:59.000Z

16

Kansas State University: DOE/KEURP Site Operator Program. Year 4, fourth quarterly report, April 1, 1995--June 30, 1995  

SciTech Connect

Kansas State University, in support of a DOE and Kansas Electric Utilities Research Program subject contract, continues to test, evaluate, demonstrate, and develop electric vehicle and infrastructure technology. K-State is operating two Soleq EVcort vehicles. During this reporting period both vehicles were brought back to full operational status after warranty service was completed by Soleq. Vehicle failures occurred due to three unrelated battery cable failures in addition to the replacement of one battery. Both vehicles are being operated on a routine basis. K-State, along with York Technical College, has established a relationship with Troy Design and Manufacturing (TDM) Redford, Michigan. K-State has ordered no less than four Ford Ranger electric trucks from TDM. K-State is involved in the steering committee that is monitoring and refining information to direct the design and testing of these new technology vehicles. TDM should become the first automotive manufacturer certified by one of the Big Three under their Quality Vehicle Manufacturer program. Kansas State University and the Kansas Electric Utility Research Program look forward to working with TDM on their new EV program.

1995-08-01T23:59:59.000Z

17

Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, October--December 1995 (first quarter of fiscal year 1996)  

DOE Green Energy (OSTI)

This is the Site Operator Program quarterly report for USDOE electric and hybrid vehicle research. Its mission now includes the three major activity categories of advancement of electric vehicle (EV) technologies, development of infrastructure elements needed to support significant EV use and increasing public awareness and acceptance of EVs. The 11 Site Operator Program participants, their geographic locations, and the principal thrusts of their efforts are identified. The EV inventories of the site operators totals about 250 vehicles. The individual fleets are summarized.

Francfort, J.E. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

1996-03-01T23:59:59.000Z

18

Kansas State University DOE/KEURP Site Operator Program. Year 3, Third quarter report, January 1, 1994--March 31, 1994  

Science Conference Proceedings (OSTI)

Formed on July 15, 1981, the goal of this program is to undertake applied research and development projects that may enhance reliability and minimize the cost of electric service in Kansas. The Kansas Electric Utilities Research Program (KEURP) is a contractual joint venture between six major electric utilities that serve the residents of the State of Kansas. The establishment of KEURP was made possible by the Kansas Corporation Commission (KCC). The KCC allowed Kansas electric utilities to include research and development (R & D) costs in their operating expenses, including dues to the Electric Power Research Institute (EPRI). Kansas universities play a unique role in KEURP with representation on the executive, technical and advisory committees of the program. The universities receive significant direct and indirect support from KEURP through direct funded projects as well as KEURP/EPRI co-funded projects. KEURP is working with EPRI researchers on projects to develop or expand Kansans knowledge and expertise in the fields of high technology and economic development. KEURP is a major source of funding in the electric/hybrid vehicle demonstration program.

Hague, J.R.

1994-05-01T23:59:59.000Z

19

Ten Year Site Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ten Year Site Plans Ten Year Site Plans A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the...

20

Year Four, 104th Congress, 3rd quarter report, January 1, 1995--March 31, 1995. DOE/KEURP Site Operator Program  

Science Conference Proceedings (OSTI)

Kansas State University is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations an opportunity to examine the latest EHV prototypes under actual operating conditions.

NONE

1995-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Site environmental report for calendar year 1996  

Science Conference Proceedings (OSTI)

This Annual Site Environmental Report presents information pertaining to environmental activities conducted during calendar year 1996 at the U.S. Department of Energy (DOE) Grand Junction Office (GJO) facility in Grand Junction, Colorado. WASTREN-Grand Junction, the Facility Operations and Support contractor for the GJO, prepared this report in accordance with the requirements of DOE Order 5400.1, General Environmental Protection Program, and supplemental guidance from DOE Headquarters. This report applies specifically to the GJO facility; the Monticello Mill Tailings Site Environmental Summary for Calendar Year 1996 was prepared as a separate document. Primary GJO activities involve laboratory analysis of environmental samples from GJO and other DOE sites and site remediation of contamination caused by previous uranium mill operations. Activities at the GJO are conducted in compliance with applicable Federal, State, and local regulations and requirements and as directed by applicable DOE orders. Environmental monitoring is performed on air emissions, sewer effluent, surface water and groundwater, and wetlands restoration. Wastes are generated from the Analytical Laboratory, site remediation, and facility operation.

NONE

1997-06-01T23:59:59.000Z

22

Electric and hybrid vehicle program; Site Operator Program. Quarterly progress report, January--March 1992 (Second quarter of fiscal year 1992)  

DOE Green Energy (OSTI)

Activities during the second quarter included the second meeting of the Site Operators in Phoenix, AZ in late April. The meeting was held in conjunction with the Solar and Electric 500 Race activities. Delivery of vehicles ordered previously has begun, although two of the operators are experiencing some delays in receiving their vehicles. Public demonstration activities continue, with an apparent increasing level of awareness and interest being displayed by the public. Initial problems with the Site Operator Database have been corrected and revised copies of the program have been supplied to the Program participants. Operating and Maintenance data is being supplied and submitted to INEL on a monthly basis. Interest in the Site Operator Program is being reflected in requests for information from several organizations from across the country, representing a wide diversity of interests. These organizations have been referred to existing Site Operators with the explanation that the program will not be adding new participants, but that most of the existing organizations are willing to work with other groups. The exception to this was the addition of Potomac Electric Power Company (PEPCO) to the program. PEPCO has been awarded a subcontract to operate and maintain the DOE owned G-Van and Escort located in Washington, DC. They will provide data on these vehicles, as well as a Solectria Force which PEPCO has purchased. The Task Force intends to be actively involved in the infrastructure development in a wide range of areas. These include, among others, personnel development, safety, charging, and servicing. Work continues in these areas. York Technical College (YORK) has completed the draft outline for the EV Technician course. This is being circulated to organizations around the country for comments. Kansas State University (KSU) is working with a private sector company to develop a energy dispensing meter for opportunity charging in public areas.

Warren, J.F.

1992-05-01T23:59:59.000Z

23

Electric and hybrid vehicle program, site operator program quarterly progress report for April through June 1996 (third quarter of fiscal year 1996)  

DOE Green Energy (OSTI)

The US Department of Energy (DOE) Site Operator Program was initially established to meet the requirements of the Electric and Hybrid Vehicle Research, Development, and Demonstration Act of 1976. The Program has since evolved in response to new legislation and interests. The goals of the Site Operator Program include the field evaluation of electric vehicles (EVs) in real-world applications and environments; the advancement of electric vehicle technologies; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of EVs by the public. The Site Operator Program currently consists of eleven participants under contract and two other organizations that have data-sharing agreements with the Program (Table ES-1). Several national organizations have joined DOE to further the introduction and awareness of electric vehicles, including: (1) EVAmerica (a utility program) and DOE conduct performance and evaluation tests to support market development for electric vehicles; and (2) DOE, the Department of Transportation, the Electric Transportation Coalition, and the Electric Vehicle Association of the Americas are conducting a series of workshops to encourage urban groups in Clean Cities (a DOE program) to initiate the policies and infrastructure development necessary to support large-scale demonstrations, and ultimately the mass market use, of electric vehicles. The current focus of the Program is the collection and dissemination of EV operations and performance data to aid in the evaluation of real-world EV use. This report contains several sections with vehicle evaluation as a focus.

Francfort, J. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

1997-01-01T23:59:59.000Z

24

Ten Year Site Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ten Year Ten Year Site Plans Ten Year Site Plans A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the Department of Energy's overall strategic plan. It is a comprehensive site-wide plan encompassing the needs of tenant activities. The TYSP is integral to and supports the Department's Planning, Programming, Budgeting, and Evaluation System (PPBES). The TYSP also describes site-specific actions the programs plans in order to meet stewardship, recapitalization and sustainability goals for their facilities. The Department requires all programs to update their TYSPs at least annually and submitted either concurrently with responses to the field budget call, or as directed to be consistent with the PPBES cycle.

25

Environmental Assessment for the Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Environmental Assessment Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan at the Thomas Jefferson National Accelerator Facility Newport News, Virginia January 2007 U. S. Department of Energy Thomas Jefferson Site Office Newport News, VA DOE/EA-1534 January 2007 C:\TRANSFER\JANUARY 26 Final EA-1534-012607 (2).doc i TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... 1 1.0 INTRODUCTION ...........................................................................................11 1.1 PREVIOUS ACTIONS....................................................................................11 1.2 SCOPE OF THIS PROPOSED ACTION .......................................................11

26

Hanford Site Environmental Surveillance Data Report for Calendar Year 2007  

Science Conference Proceedings (OSTI)

Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2007" (PNNL-17603), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

Bisping, Lynn E.

2008-10-13T23:59:59.000Z

27

Hanford Site Environmental Surveillance Data Report for Calendar Year 2008  

SciTech Connect

Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2008" (PNNL-18427), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

Bisping, Lynn E.

2009-08-11T23:59:59.000Z

28

Kansas State University DOE/KEURP Site Operator User Task Force. Year 3, Fourth quarterly report, April 1--June 30, 1994  

DOE Green Energy (OSTI)

This program relates to demonstration use of electric-powered vehicles. KSU has two electric cars (conversion vehicles) from Soleq. Corp., and is purchasing 4 Chevy trucks for conversion. This document discusses the participating groups, program plan, events, vehicles and components, operations, and procurement.

Hague, J.

1994-06-28T23:59:59.000Z

29

Site environmental report for calendar year 1992  

Science Conference Proceedings (OSTI)

This report documents the results of the Environmental Monitoring Program at BNL and presents summary information about environmental compliance for 1992. To evaluate the effect of BNL operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, ground water and vegetation were made at the BNL site and at sites adjacent to the Laboratory. Brookhaven National Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment were evaluated. Among the permitted facilities, only the discharge from the Sewage Treatment Plant (STP) to the Peconic River exceeded, on occasion only, the fecal and total coliform concentration limits at the discharge point. This was later attributed to off-site Contractor Laboratory quality assurance problems. The environmental monitoring data has continued to demonstrate, besides the site specific contamination of ground water and soil resulting from past operations, that compliance was achieved with environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at BNL are minimal and pose no threat to the public or to the environment. This report meets the requirements of DOE Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Royce, B.A.; Miltenberger, R.P.

1993-05-01T23:59:59.000Z

30

Operational Awareness Site Visi to the Pantex Plant, October 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Activity Report - Rev. 0 Report Number: HIAR PTX-2011-10-28 Activity Report - Rev. 0 Report Number: HIAR PTX-2011-10-28 Site: Pantex Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Operational Awareness Site Visit to the Pantex Plant Dates of Activity: 10/24/2011 - 10/28/2011 Report Preparer William Macon Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) operational awareness site visit was for the Pantex Plant site lead to discuss the design/construction of the new high explosives pressing facility (HEPF) and the scheduling of fiscal year (FY) 2012 independent oversight activities. Result: The HSS site lead attended daily Integrated Plan of the Day meetings and met with numerous Pantex Site Office (PXSO)

31

Hanford Site air operating permit application  

SciTech Connect

The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

NONE

1995-05-01T23:59:59.000Z

32

2005 Site environmental reportv Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report  

E-Print Network (OSTI)

.4 years. Initiatives to reduce, recycle, and reuse 2.8 million pounds of industrial, sanitary, hazardous monitoring. Radiological Dose Assessment Program BNL routinely assesses its operations to ensure that any to a hypothetical Maximally Exposed In- dividual (MEI) at the BNL site boundary. For dose assessment purposes

Homes, Christopher C.

33

Annual Site Environmental Report Calendar Year 2007  

Science Conference Proceedings (OSTI)

This report summarizes the environmental status of Ames Laboratory for calendar year 2007. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies 11 buildings owned by the Department of Energy (DOE). See the Laboratory's Web page at www.external.ameslab.gov for locations and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2007, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2007. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2007. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2003. Included in these efforts were battery and CRT recycling, waste white paper and green computer paper-recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, styrofoam peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Self Assessment Report, on its Affirmative Procurement Performance Measure. A performance level of 'A' was achieved in 2007 for Integrated Safety, Health, and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts.

Dan Kayser-Ames Laboratory

2007-12-31T23:59:59.000Z

34

Annual Site Environmental Report Calendar Year 2010  

Science Conference Proceedings (OSTI)

This report summarizes the environmental status of Ames Laboratory for calendar year 2010. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. In 2010, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local regulations and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2010. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2010. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2010. Included in these efforts were battery and CRT recycling, miscellaneous electronic office equipment, waste white paper and green computer paper-recycling and corrugated cardboard recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, foamed polystyrene peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Performance Evaluation Measurement Plan, on its Affirmative Procurement Performance Measure. A performance level of 'A-' was achieved in 2010 for Integrated Safety, Health and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System (EMS) has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts. The Laboratory's EMS was audited in April 2009 by DOE-CH. There were four 'Sufficiently in Conformity' findings as a result of the audit. All four findings were tracked in the Laboratory's corrective action database for completion. Beryllium was used routinely at Ames Laboratory in the 1940's and 1950's in processes developed for the production of highly pure uranium and thorium in support of the historic Manhattan Project. Laboratory metallurgists also worked on a process to produce pure beryllium metal from beryllium fluoride. In the early 1950's, beryllium oxide powder was used to produce shaped beryllium and crucibles. As a result of that work, beryllium contamination now exists in many interstitial spaces (e.g., utility chases) and ventilation systems in Wilhelm, Spedding and Metals Development buildings. Extensive characterization and remediation efforts have occurred in 2009 and 2010 in order to better understand the extent of the contamination. Analysis of extensive sampling data suggests that a fairly wide dispersion of beryllium occurred (most likely in the 1950's and 60's) in Wilhelm Hall and in certain areas of Spedding Hall and Metals Development. Area air-sampling results and work-area surface characterizations indicate the exposure potential to current workers, building visitors and the public remains extremely low. This information is now used to guide cleaning efforts and to provide worker protection during remodeling and maintenance activities. Results were shared with the DOE's Former Worker Program to support former worker medical test

Kayser, Dan

2011-01-31T23:59:59.000Z

35

Site Environmental Report-Calendar Year 2001  

Science Conference Proceedings (OSTI)

The Laboratory's mission is to conduct fundamental research in the physical, chemical, materials, mathematical sciences and engineering which underlie energy generating, conversion, transmission and storage technologies, environmental improvement, and other technical areas essential to national needs. These efforts will be maintained so as to contribute to the achievement of the Department of Energy's Missions and Goals; more specifically, to increase the general levels of scientific knowledge and capabilities, to prepare engineering and physical sciences students for future scientific endeavors, and to initiate nascent technologies and practical applications arising from our basic scientific programs. The Laboratory will approach all its operations with the safety and health of all workers as a constant objective and with genuine concern for the environment. Ames Laboratory does not conduct classified research. The primary purpose of this report is to summarize the performance of Ames Laboratory's environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2001. This report is a working requirement of Department of Energy Order 231.1, Environment, Safety, and Health Reporting''.

Dan Kayser

2002-09-03T23:59:59.000Z

36

Nevada National Security Site Operational Awareness Oversight...  

NLE Websites -- All DOE Office Websites (Extended Search)

HSS Independent Activity Report - Rev. 0 Report Number: HIAR NNSS-2012-12-03 Site: Nevada National Security Site Subject: Office of Enforcement and Oversight's Office of Safety...

37

Web Site Highlights 50 Years of NIST Contributions to Laser ...  

Science Conference Proceedings (OSTI)

Web Site Highlights 50 Years of NIST Contributions to Laser Science. For Immediate Release: December 15, 2009. ...

2010-10-08T23:59:59.000Z

38

Hanford Site Groundwater Monitoring for Fiscal Year 2001  

SciTech Connect

This report provides information on the status of groundwater monitoring at the Hanford Site during fiscal year 2001.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2002-02-28T23:59:59.000Z

39

Hanford Site Environmental Report for Calendar Year 2001  

SciTech Connect

This report summarizes environmental information for the Hanford Site in Washington State for the calendar year 2001.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2002-09-02T23:59:59.000Z

40

Site and Operations Overview 1-1 1. Site and Operations Overview  

E-Print Network (OSTI)

the materials for the first atomic bombs. The reservation's role has evolved over the years, and it continues Reservation Annual Site Environmental Report and supporting data are available at http,Safety and Health Reporting," for an annual summary of environmental data to characterize environmental performance

Pennycook, Steve

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Site and Operations Overview 1-1 1. Site and Operations Overview  

E-Print Network (OSTI)

the materials for the first atomic bombs. The reservation's role has evolved over the years, and it continues Reservation Annual Site Environmental Report and supporting data are available at http and Health Reporting," for an annual summary of environmental data to char- acterize environmental

Pennycook, Steve

42

Site and Operations Overview 1-1 1. Site and Operations Overview  

E-Print Network (OSTI)

the materials for the first atomic bombs. The reservation's role has evolved over the years, and it continues Reservation Annual Site Environmental Report and Environmental Monitoring on the Oak Ridge Reservation: 2001 of Energy (DOE) Order 231.1, "Environment, Safety and Health Reporting," for an annual summary of environ

Pennycook, Steve

43

Site and Operations Overview 1-1 1. Site and Operations Overview  

E-Print Network (OSTI)

materials for the first atomic bombs. The reservation's role has evolved over the years, and it continues Reservation Annual Site Environmental Report and supporting data are available at http, "Environment, Safety and Health Reporting," for an annual summary of environ- mental data to characterize

Pennycook, Steve

44

Annual Site Environmental Report for Calendar Years 2009 to 2010  

SciTech Connect

This report presents the results of environmental activities and monitoring programs at the Princeton Plasma Physics Laboratory (PPPL) for Calendar Years 2009-2010. The report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are released into the environment as a result of PPPL operations. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2009-2010. The objective of the Site Environmental Report is to document PPPL's efforts to protect the public's health and the environment through its environmental protection, safety, and health programs. __________________________________________________

Virginia Finley

2012-08-08T23:59:59.000Z

45

Drilling operations at the Nevada Test Site  

SciTech Connect

The Nevada Operations Office (NV) is responsible for supporting the nuclear test programs of the Los Alamos and Lawrence Livermore National Laboratories. This support includes the drilling of test holes for nuclear device testing a the Nevada Test Site (NTS). The purpose of this audit was to assess the effectiveness of the Department of Energy's management of test hole inventories at the NTS. Our audit disclosed that NV accumulated a large inventory of unused test holes and approved drilling additional holes for which neither laboratory (Los Alamos nor Livermore) had identified a need. The overdrilling of test holes occurred because NV did not comply with good inventory practices that would have had NV's approving official question the need for, and the timing of, the laboratories' drilling requests. Instead, NV gave perfunctory approval to the laboratories' work orders for drilling test holes, and emphasized keeping two drill rig crews busy and satisfying the laboratories' demands for dedicated drilling personnel. Although NV did not agree that overdrilling had occurred, it has cut back its drilling activities and estimated that this will save abut $7.6 million annually. NV agreed with the recommendations in the report and has taken corrective actions.

1990-05-29T23:59:59.000Z

46

Hanford Site groundwater monitoring for fiscal year 1996  

Science Conference Proceedings (OSTI)

This report presents the results of groundwater and vadose-zone monitoring for fiscal year (FY) 1996 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiological and chemical waste that affected groundwater quality on the site. Characterization and monitoring of the vadose zone during FY 1996 comprised primarily spectral gamma logging, soil-gas monitoring, and electrical resistivity tomography. Water-level monitoring was performed to evaluate groundwater-flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Water levels over most of the Hanford Site continued to decline between June 1995 and June 1996. Groundwater chemistry was monitored to track the extent of contamination, to note trends, and to identify emerging groundwater-quality problems. The most widespread radiological contaminant plumes were tritium and iodine-129. Smaller plumes of strontium-90, technetium-99, and plutonium also were present at levels above the U.S. Environmental Protection Agency or State of Washington interim drinking water standards. Uranium concentrations greater than the proposed drinking water standard were also observed. Nitrate, fluoride, chromium, carbon tetrachloride, chloroform, trichloroethylene, and cis-1,2-dichlomethylene were present in groundwater samples at levels above their U.S. Environmental Protection Agency or State of Washington maximum contaminant levels. The nitrate plume is the most extensive. Three-dimensional, numerical, groundwater models were applied to the Hanford Site to predict contaminant-flow paths and the impact of operational changes on site groundwater conditions. Other models were applied to assess the performance of three separate pump-and-treat systems.

Hartman, M.J.; Dresel, P.E.; Borghese, J.V. [eds.] [and others] [eds.; and others

1997-02-01T23:59:59.000Z

47

Argonne National Laboratory site environmental report for calendar year 2007.  

SciTech Connect

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2007. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; Davis, T. M.; Moos, L. P.; ESH /QA Oversight

2008-09-09T23:59:59.000Z

48

Argonne National Laboratory site enviromental report for calendar year 2008.  

Science Conference Proceedings (OSTI)

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2008. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; Davis, T. M.; Moos, L. P.

2009-09-02T23:59:59.000Z

49

Argonne National Laboratory site environmental report for calendar year 2004.  

SciTech Connect

This report discusses the accomplishments of the environmental protection program at Argonne National Laboratory (ANL) for calendar year 2004. The status of ANL environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of ANL operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the ANL site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and ANL effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, ANL, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; Kolzow, R. G.

2005-09-02T23:59:59.000Z

50

Argonne National Laboratory site environmental report for calendar year 2006.  

Science Conference Proceedings (OSTI)

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2006. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; ESH /QA Oversight

2007-09-13T23:59:59.000Z

51

Nevada National Security Site Operational Awareness Oversight...  

NLE Websites -- All DOE Office Websites (Extended Search)

HSS Independent Activity Report - Rev. 0 Report Number: HIAR NNSS-2011-11-28 Site: Nevada National Security Site Subject: Office of Enforcement and Oversight's Office of Safety and...

52

Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992  

SciTech Connect

This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

1991-08-01T23:59:59.000Z

53

The Defense Waste Processing Facility: Two Years of Radioactive Operation  

Science Conference Proceedings (OSTI)

The Defense Waste Processing Facility (DWPF) at the Savannah River Site in Aiken, SC is currently immobilizing high level radioactive sludge waste in borosilicate glass. The DWPF began vitrification of radioactive waste in May, 1996. Prior to that time, an extensive startup test program was completed with simulated waste. The DWPF is a first of its kind facility. The experience gained and data collected during the startup program and early years of operation can provide valuable information to other similar facilities. This experience involves many areas such as process enhancements, analytical improvements, glass pouring issues, and documentation/data collection and tracking. A summary of this experience and the results of the first two years of operation will be presented.

Marra, S.L. [Westinghouse Savannah River Company, AIKEN, SC (United States); Gee, J.T.; Sproull, J.F.

1998-05-01T23:59:59.000Z

54

Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992: Executive summary  

SciTech Connect

This report describes the environmental restoration and waste management (ER/WM) planning process, communicates ER/WM`s philosophy and overall strategy for achieving its compliance and cleanup goals, summarizes multi-year program plans and assesses progress made during the previous year. The FYP goal is to ensure that risks to human health and safety and to the environment posed by the Department`s past, present, and future operations are either eliminated to reduced to safer levels by the year 2019. The SSP applies the overall strategic goals and commitments of the FYP, incorporating site-specific and local public considerations. It will address accomplishments since the FY 1990 plan, document planned activities focused on the upcoming fiscal year (FY 1992) and discuss milestones and objectives based on restricted and nonrestricted budget conditions for FY 1993--1997. The SSP is the primary means of demonstrating the relationship of local cleanup and compliance activities to broad environmental goals set forth in the FYP. The SSP provides an important channel for conveying information to regulators, the public, special interest groups, and other DOE organizations. This summary will briefly review the site`s facilities and missions, current and future program objectives, major accomplishments, funding levels, and major milestones for the five-year period.

1991-08-01T23:59:59.000Z

55

Hanford Site Groundwater Monitoring for Fiscal Year 2003  

SciTech Connect

This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2003 (October 2002 through September 2003) on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes in groundwater are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. The largest portions of these plumes are migrating from the central Hanford Site to the southeast, toward the Columbia River. Concentrations of tritium, nitrate, and some other contaminants continued to exceed drinking water standards in groundwater discharging to the river in some locations. However, contaminant concentrations in river water remained low and were far below standards. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the central part of the Hanford Site. Hexavalent chromium is present in smaller plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath all but one of the reactor areas, and technetium-99 and uranium are present in the 200 Areas. Uranium exceeds standards in the 300 Area in the south part of the Hanford Site. Minor contaminant plumes with concentrations greater than standards include carbon-14, cesium-137, cis-1,2-dichloroethene, cyanide, fluoride, plutonium, and trichloroethene. Monitoring for the ''Comprehensive Environmental Response, Compensation, and Liability Act'' is conducted in 11 groundwater operable units. The purpose of this monitoring is to define and track plumes and to monitor the effectiveness of interim remedial actions. Interim groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100-K, 100-D, and 100-H) and strontium-90 (100-N) reaching the Columbia River. The objective of two interim remediation systems in the 200 West Area is to prevent the spread of carbon tetrachloride and technetium-99/uranium plumes. ''Resource Conservation and Recovery Act'' groundwater monitoring continued at 24 waste management areas during fiscal year 2003: 15 under interim or final status detection programs and data indicate that they are not adversely affecting groundwater; 7 under interim status groundwater quality assessment programs to assess contamination; and 2 under final status corrective-action programs. During calendar year 2003, drillers completed seven new RCRA monitoring wells, nine wells for CERCLA, and two wells for research on chromate bioremediation. Vadose zone monitoring, characterization, and remediation continued in fiscal year 2003. Remediation and associated monitoring continued at a soil-vapor extraction system in the 200 West Area, which removes gaseous carbon tetrachloride from the vadose zone. Soil vapor also was sampled to locate carbon tetrachloride sites with the potential to impact groundwater in the future. DOE uses geophysical methods to monitor potential movement of contamination beneath single-shell tank farms. During fiscal year 2003, DOE monitored selected boreholes within each of the 12 single-shell tank farms. In general, the contaminated areas appeared to be stable over time. DOE drilled new boreholes at the T Tank Farm to characterize subsurface contamination near former leak sites. The System Assessment Capability is a set of computer modules simulating movement of contaminants from waste sites through the vadose zone and groundwater. In fiscal year 2003, it was updated with the addition of an atmospheric transport module and with newer versions of models including an updated groundwater flow and transport model.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2004-04-12T23:59:59.000Z

56

Hanford Site Groundwater Monitoring for Fiscal Year 2005  

SciTech Connect

This report is one of the major products and deliverables of the Groundwater Remediation and Closure Assessment Projects detailed work plan for FY 2006, and reflects the requirements of The Groundwater Performance Assessment Project Quality Assurance Plan (PNNL-15014). This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2005 on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes in groundwater are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. The largest portions of these plumes are migrating from the central Hanford Site to the southeast, toward the Columbia River. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the west-central part of the Hanford Site. Hexavalent chromium is present in plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath all but one of the reactor areas. Technetium-99 and uranium plumes exceeding standards are present in the 200 Areas. A uranium plume underlies the 300 Area. Minor contaminant plumes with concentrations greater than standards include carbon-14, cesium-137, cis-1,2-dichloroethene, cyanide, fluoride, plutonium, and trichloroethene. Monitoring for the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 is conducted in 11 groundwater operable units. The purpose of this monitoring is to define and track plumes and to monitor the effectiveness of interim remedial actions. Interim groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100-K, 100-D, and 100-H) and strontium-90 (100-N) reaching the Columbia River. The objective of two interim remediation systems in the 200 West Area is to prevent the spread of carbon tetrachloride and technetium-99/uranium plumes. Resource Conservation and Recovery Act of 1976 groundwater monitoring continued at 25 waste management areas during fiscal year 2005: 15 under interim or final status detection programs and data indicate that they are not adversely affecting groundwater, 8 under interim status groundwater quality assessment programs to assess contamination, and 2 under final status corrective-action programs. During calendar year 2005, drillers completed 27 new monitoring wells, and decommissioned (filled with grout) 115 unneeded wells. Vadose zone monitoring, characterization, and remediation continued in fiscal year 2005. Remediation and associated monitoring continued at a soil-vapor extraction system in the 200 West Area, which removes gaseous carbon tetrachloride from the vadose zone. DOE uses geophysical methods to monitor potential movement of contamination beneath former waste sites.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2006-02-28T23:59:59.000Z

57

Texas Large Construction Site Notice for Primary Operators |...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Texas Large Construction Site Notice for Primary Operators edit Details Activities (0)...

58

Texas Large Construction Site Notice for Secondary Operators...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Texas Large Construction Site Notice for Secondary Operators edit Details Activities (0)...

59

Sequim Site Radionuclide Air Emissions Report for Calendar Year 2012  

SciTech Connect

This report is prepared to document compliance with the Code of Federal Regulations (CFR), Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), Subpart H, National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities and ashington Administrative Code (WAC) Chapter 246-247, Radiation Protection Air Emissions. This report meets the calendar year 2012 Sequim Site annual reporting requirement for its operations as a privately-owned facility as well as its federally-contracted status that began in October 2012. Compliance is indicated by comparing the estimated dose to the maximally exposed individual (MEI) with the 10 mrem/yr Environmental Protection Agency (EPA) standard. The MSL contains only sources classified as fugitive emissions. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The dose to the Sequim Site MEI due to routine operations in 2012 was 9E-06 mrem (9E-08 mSv). No non-routine emissions occurred in 2012. The MSL is in compliance with the federal and state 10 mrem/yr standard.

Snyder, Sandra F.; Barnett, J. M.; Gervais, Todd L.

2013-04-01T23:59:59.000Z

60

Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online February 3, 2011 - 12:00pm Addthis Media Contact Danielle Miller (DOE-ID) 208-526-5709 An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy's (DOE) Idaho site. "This report verifies that the performance of cleanup actions at the Idaho Site continues to be protective of human health and the environment," said Nicole Hernandez, DOE's project manager for the five-year review. "The findings in the report demonstrate a strong collaborative effort by CH2M-WG Idaho (CWI), DOE, the Environmental

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Two Years of Operational Hurricane Synoptic Surveillance  

Science Conference Proceedings (OSTI)

In 1997, the National Hurricane Center and the Hurricane Research Division began operational synoptic surveillance missions with the Gulfstream IV-SP jet aircraft to improve the numerical guidance for hurricanes that threaten the continental ...

Sim D. Aberson

2002-10-01T23:59:59.000Z

62

DOE/KEURP Site Operator Program  

SciTech Connect

A second successful year has been completed of demonstrating and evaluating electric vehicle technology. The G-Van has begun to show signs of system failure (<10 miles/charge). The DSEP minivan remains idle. The Soleq vehicle performed well.

Hague, J.R.

1993-01-01T23:59:59.000Z

63

Energy Facility Evaluation, Siting, Construction and Operation (New  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Facility Evaluation, Siting, Construction and Operation (New Energy Facility Evaluation, Siting, Construction and Operation (New Hampshire) Energy Facility Evaluation, Siting, Construction and Operation (New Hampshire) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Multi-Family Residential Municipal/Public Utility Retail Supplier Rural Electric Cooperative Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Wind Program Info State New Hampshire Program Type Siting and Permitting Provider NH Department of Environmental Services, Public Information and Permitting Unit The statute establishes a procedure for the review, approval, monitoring,

64

Kansas State University electric vehicle site operator program  

DOE Green Energy (OSTI)

K-State is presently working with Grumman Allied and Unique Mobility to establish a working agreement for the research and development of a pure electric postal vehicle. K-State has worked on the design of this vehicle for the past year and is working to establish the appropriate consortium to bring this vehicle to commercial realization. K-State is working to establish infrastructure support for electric vehicles. Presently, a Kansas company is working with K-State to bring its patented low-cost vehicle metering product to market. An anticipated second year DOE project would provide 100 electric metering stations to Southern California for a large scale electric vehicle infrastructure demonstration project. This project would allow a parking lot(s) to be made EV ready. K-State's Site Operator Program continues to get the word-out'' about electric vehicles. From a personal visit by Senator Bob Dole, to Corporate Board of Director Meetings, to school classrooms, to shopping mall demonstrations; K-State Employees are increasing public access and awareness about the electric vehicle industry. As has been shown in this report, K-State's G-Van has logged an average eighteen miles per day while maintaining a full schedule of public relations tours within the state of Kansas and Missouri. K-State has now been contacted by companies in Nebraska and Iowa requesting information and involvement in this program. Kansas and Kansas State will continue its work to contribute to the Site Operator Program effort. With the purchase of two additional electric vehicles and the pending request to purchase two more electric vehicles during the next contractual year, K-states's program will grow. When vehicle development plans and infrastructure requirements are solidified, K-State's program will be ready to participate and be a major contributor to the development and introduction of this technology.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-01-01T23:59:59.000Z

65

Kansas State University electric vehicle site operator program  

SciTech Connect

K-State is presently working with Grumman Allied and Unique Mobility to establish a working agreement for the research and development of a pure electric postal vehicle. K-State has worked on the design of this vehicle for the past year and is working to establish the appropriate consortium to bring this vehicle to commercial realization. K-State is working to establish infrastructure support for electric vehicles. Presently, a Kansas company is working with K-State to bring its patented low-cost vehicle metering product to market. An anticipated second year DOE project would provide 100 electric metering stations to Southern California for a large scale electric vehicle infrastructure demonstration project. This project would allow a parking lot(s) to be made EV ready. K-State's Site Operator Program continues to get the word-out'' about electric vehicles. From a personal visit by Senator Bob Dole, to Corporate Board of Director Meetings, to school classrooms, to shopping mall demonstrations; K-State Employees are increasing public access and awareness about the electric vehicle industry. As has been shown in this report, K-State's G-Van has logged an average eighteen miles per day while maintaining a full schedule of public relations tours within the state of Kansas and Missouri. K-State has now been contacted by companies in Nebraska and Iowa requesting information and involvement in this program. Kansas and Kansas State will continue its work to contribute to the Site Operator Program effort. With the purchase of two additional electric vehicles and the pending request to purchase two more electric vehicles during the next contractual year, K-states's program will grow. When vehicle development plans and infrastructure requirements are solidified, K-State's program will be ready to participate and be a major contributor to the development and introduction of this technology.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-01-01T23:59:59.000Z

66

EIS-0380: Site-Wide Environmental Impact Statement for Continued Operation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

380: Site-Wide Environmental Impact Statement for Continued 380: Site-Wide Environmental Impact Statement for Continued Operation of the Los Alamos National Laboratory, New Mexico EIS-0380: Site-Wide Environmental Impact Statement for Continued Operation of the Los Alamos National Laboratory, New Mexico Summary This Site-Wide EIS evaluates the continued operation of the Los Alamos National Laboratory (LANL). NNSA identified and assessed three alternatives for continued operation of LANL: (1) No Action, (2) Reduced Operations, and (3) Expanded Operations. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 20, 2013 EIS-0380: Mitigation Action Plan Annual Report Los Alamos National Laboratory Site-Wide Environmental Impact Statement Fiscal Year 2012 Mitigation Action Plan Annual Report

67

Audit of the Richland Operations Office Site Characterization Program, IG-0368  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 1995 0, 1995 IG-1 INFORMATION: Report on "Audit of the Richland Operations Office Site Characterization Program" The Secretary BACKGROUND: With its designation as an environmental cleanup site in 1989, the Hanford Site has represented a major activity of the Department of Energy (Department). The final cleanup of this site is estimated to take over 50 years and cost close to $100 billion. Although there are many factors influencing the operations at Hanford, the Department and the Richland Operations Office (Richland) are ultimately responsible for its success. The Department and Richland are responsible for establishing procedures that ensure program goals are accomplished using the most cost-effective methods. DISCUSSION:

68

Nevada National Security Site Operational Awareness Oversight Visit, December 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HIAR NNSS-2012-12-03 HIAR NNSS-2012-12-03 Site: Nevada National Security Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Operational Awareness Oversight of the Nevada National Security Site Dates of Activity 12/03/2012 - 12/06/2012 Report Preparer: William Macon Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) activity was to perform an operational awareness site visit to observe Subcritical Experiment (SCE) activities at the U1a Complex, discuss ongoing activities at the National Criticality Experiment Research Center (NCERC), and monitor the status of other ongoing site activities at the Nevada National Security Site (NNSS) operated by National Security Technologies, LLC (NSTec).

69

Kansas State University (KSU), DOE EV Site Operator Program  

SciTech Connect

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy's Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort station wagons. The G-Van has been signed in order for the public to be aware that this is an electric drive vehicle. Financial participant's names have been stenciled on the back door of the van. This vehicle is available for short term loan to interested utilities and companies. When other vehicles are obtained, the G-Van will be maintained on K-State's campus.

Hague, J.R.

1992-11-17T23:59:59.000Z

70

Kansas State University (KSU), DOE EV Site Operator Program  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy's Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort station wagons. The G-Van has been signed in order for the public to be aware that this is an electric drive vehicle. Financial participant's names have been stenciled on the back door of the van. This vehicle is available for short term loan to interested utilities and companies. When other vehicles are obtained, the G-Van will be maintained on K-State's campus.

Hague, J.R.

1992-11-17T23:59:59.000Z

71

Hanford Site Environmental Report for Calendar Year 2005  

Science Conference Proceedings (OSTI)

This report, published annually since 1958, includes information and summary analytical data that (1) provide an overview of activities at the Hanford Site during calendar year 2005; (2) demonstrate the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and U.S. Department of Energy (DOE) policies and directives; (3) characterize Hanford Site environmental management performance; and (4) highlight significant environmental programs.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2006-09-28T23:59:59.000Z

72

Hanford Site Environmental Report for Calendar Year 2004  

Science Conference Proceedings (OSTI)

This report, published annually since 1958, includes information and summary analytical data that (1) provide an overview of activities at the Hanford Site during calendar year 2003; (2) demonstrate the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and U.S. Department of Energy (DOE) policies and directives; (3) characterize Hanford Site environmental management performance; and (4) highlight significant environmental programs.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.

2005-09-29T23:59:59.000Z

73

Hanford Site Groundwater Monitoring for Fiscal Year 2004  

Science Conference Proceedings (OSTI)

This document presents the results of groundwater and vadose zone monitoring for fiscal year 2004 (October 2003 through September 2004)on the U.S. Department of Energy's Hanford Site in southeast Washington State.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2005-03-01T23:59:59.000Z

74

EA-1332: Leasing Land for the Siting, Construction and Operation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Leasing Land for the Siting, Construction and Operation of a Commercial AM Radio Antenna at Los Alamos National Laboratory, Los Alamos, New Mexico EA-1332: Leasing Land for the...

75

SRNS-RP-2013-00005 Savannah River Site Ten Year Site Plan FY  

NLE Websites -- All DOE Office Websites (Extended Search)

SRNS-RP-2013-00005 SRNS-RP-2013-00005 Savannah River Site Ten Year Site Plan FY 2014 - 2023 May 2013 United States Department of Energy Savannah River Site Ten Year Site Plan FY 2014 - 2023 May 2013 Prepared by: Savannah River Nuclear Solutions, LLC A Fluor Daniel Partnership Savannah River Site Aiken, SC 29808 SRNS-RP-2013-00005 Savannah River Site Ten Year Site Plan SRNS-RP-2013-00005 May 2013 DISCLAIMER This report was prepared by Savannah River Nuclear Solutions LLC (SRNS) for the United States Department of Energy under Contract No. DE-AC09-08SR22470 and is an account of work performed under that contract. Reference herein to any specific commercial product, process or services by trademark, name, manufacturer, or otherwise does not necessarily constitute or imply endorsement,

76

United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

Not Available

1994-06-01T23:59:59.000Z

77

Mailing Addresses and Information Numbers for Operations, Field, and Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

About Energy.gov » Mailing Addresses and Information Numbers for About Energy.gov » Mailing Addresses and Information Numbers for Operations, Field, and Site Offices Mailing Addresses and Information Numbers for Operations, Field, and Site Offices Name Telephone Number U.S. Department of Energy Ames Site Office 111 TASF, Iowa State University Ames, Iowa 50011 515-294-9557 U.S. Department of Energy Argonne Site Office 9800 S. Cass Avenue Argonne, IL 60439 630-252-2000 U.S. Department of Energy Berkeley Site Office Berkeley National Laboratory 1 Cyclotron Road Berkeley, CA 94720 510-486-5784 U.S. Department of Energy Bonneville Power Administration P.O. Box 3621 905 NE 11th Avenue Portland, OR 97232 Bonneville Power Administration General and Regional Offices 503-230-3000 U.S. Department of Energy Brookhaven Site Office Upton, NY 11973 631-344-5050

78

Brookhaven National Laboratory site environmental report for calendar year 1994  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and presents summary information about environmental compliance for 1994. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, groundwater, fauna and vegetation were made at the Brookhaven National Laboratory site and at sites adjacent to the Laboratory.

Naidu, J.R.; Royce, B.A. [eds.

1995-05-01T23:59:59.000Z

79

Department of Energy Announces Two Year Pay Freeze on Site and Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Two Year Pay Freeze on Site and Two Year Pay Freeze on Site and Facility Management Contractor Employees Department of Energy Announces Two Year Pay Freeze on Site and Facility Management Contractor Employees December 17, 2010 - 12:00am Addthis Washington DC - Following President Obama's recent proposal for a two-year pay freeze for all civilian federal workers, U.S. Energy Secretary Steven Chu today announced a decision to stop salary and bonus pool increases for site and facility management contractor employees, who manage day-to-day operations at certain Department of Energy sites and facilities, including national laboratories. "As our nation continues to recover from these challenging economic times, households and small businesses across the country are making sacrifices,"

80

Calendar Year 2004 annual site environmental report : Tonopah Test Range, Nevada & Kauai Test Facility, Hawaii.  

Science Conference Proceedings (OSTI)

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, manages TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2004. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2005) and DOE Order 231.1A, Environment, Safety, and Health Reporting (DOE 2004b).

Montoya, Amber L.; Wagner, Katrina; Goering, Teresa Lynn; Koss, Susan I.; Salinas, Stephanie A.

2005-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Electric and Hybrid Vehicle Program; Site Operator Program  

DOE Green Energy (OSTI)

Activities during the first quarter centered around integrating the new participants into the program. A meeting of the Site Operators, in conjunction with the first meeting of the Electric Vehicle Users Task Force, was held in October. A second meeting of the Task Force was held in December. During these meetings the new contractual requirements were explained to the participants. The Site Operator Data Base was distributed and explained. The Site Operators will begin using the data base in December 1991 and will supply the operating and maintenance data to the INEL on a monthly basis. The Operators requested that they be able to have access to the data of the other Operators and it was agreed that they would be provided this on floppy disk monthly from the INEL. Presentations were made to the DOE sponsored Automotive Technology Development-Contractors Coordination Meeting in October. An overview of the program was given by EG G. Representatives from Arizona Public Service, Texas A M University, and York Technical College provided details of their programs and the results and future goals. Work was begun on commercializing the Versatile Data Acquisition System (VDAS). A Scope of Work has been written for a Cooperative Research and Development Agreement (CRADA) to be submitted to the USABC. If implemented, the CRADA will provide funds for the development and commercialization of the VDAS. Participants in the Site Operator Program will test prototypes of the system within their fleets, making the data available to the USABC and other interested organizations. The USABC will provide recommendations on the data to be collected. Major activities by the majority of the Operators were involved with the continued operation and demonstration of existing vehicles. In addition, several of the operators were involved in identifying and locating vehicles to be added to their fleets. A list of the vehicles in each Site Operator fleet is included as Appendix A to this report.

Warren, J.F.

1992-01-01T23:59:59.000Z

82

Hanford Site Groundwater Monitoring for Fiscal Year 2000  

SciTech Connect

This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2000 on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the central part of the Site. Hexavalent chromium is present in smaller plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath each of the reactor areas, and technetium-99 and uranium are present in the 200 Areas. RCRA groundwater monitoring continued during fiscal year 2000. Vadose zone monitoring, characterization, remediation, and several technical demonstrations were conducted in fiscal year 2000. Soil gas monitoring at the 618-11 burial ground provided a preliminary indication of the location of tritium in the vadose zone and in groundwater. Groundwater modeling efforts focused on 1) identifying and characterizing major uncertainties in the current conceptual model and 2) performing a transient inverse calibration of the existing site-wide model. Specific model applications were conducted in support of the Hanford Site carbon tetrachloride Innovative Treatment Remediation Technology; to support the performance assessment of the Immobilized Low-Activity Waste Disposal Facility; and in development of the System Assessment Capability, which is intended to predict cumulative site-wide effects from all significant Hanford Site contaminants.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2001-03-01T23:59:59.000Z

83

Mound site environmental report for calendar year 1992  

Science Conference Proceedings (OSTI)

The purpose of this report is to inform the public about the impact of Mound operations on the population and the environment. Mound is a government-owned facility operated by EG&G Mound Applied Technologies for the US Department of Energy (DOE). This integrated production, development, and research site performs work in support of DOE`s weapon and energy related programs, with emphasis on explosive, nuclear and energy technologies.

Bauer, L.R.

1993-07-01T23:59:59.000Z

84

Colonie Interim Storage Site annual site environmental report for calendar year 1989, Colonie, New York  

SciTech Connect

IN 1984, Congress assigned the cleanup of the National Lead (NL) Industries site in Colonie, New York, to the Department of Energy (DOE) as part of a decontamination research and development project under the 1984 Energy and Water Appropriations Act. DOE then included the site in the Formerly Utilized Sites Remedial Action Program (FUSRAP), an existing DOE program to decontaminate or otherwise control sites where residual radioactive materials remain for the early years of the nation's atomic energy program. DOE instituted an environmental monitoring program at the site in 1984. Results are presented annually in reports such as this. Under FUSRAP, the first environmental monitoring report for this site presented data for calendar year 1984. This report presents the findings of the environmental monitoring program conducted during calendar year 1989. 16 refs., 17 figs., 14 tabs.

1990-05-01T23:59:59.000Z

85

2014-2023 Ten-Year Site Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2014-2023 Ten-Year Site Plan 2014-2023 Ten-Year Site Plan 2014-2023 Ten-Year Site Plan The Idaho National Laboratory (INL) Ten-Year Site Plan for Fiscal Year 2014 outlines the vision, strategy, and progress toward delivering and sustaining world-leading capabilities needed for the core mission of the laboratory - nuclear energy research, development and demonstration (RD&D) and multi-program missions in energy security and national and homeland security. With the largest concentration of operating reactor and fuel cycle research facilities in the country, INL is the only national laboratory dedicated to civilian nuclear energy and the only national laboratory owned by the Department of energy (DOE) Office of Nuclear Energy (DOE-NE) When INL was launched in 2005, the first priority was to stabilize the

86

2014-2023 Ten-Year Site Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-2023 Ten-Year Site Plan 4-2023 Ten-Year Site Plan 2014-2023 Ten-Year Site Plan The Idaho National Laboratory (INL) Ten-Year Site Plan for Fiscal Year 2014 outlines the vision, strategy, and progress toward delivering and sustaining world-leading capabilities needed for the core mission of the laboratory - nuclear energy research, development and demonstration (RD&D) and multi-program missions in energy security and national and homeland security. With the largest concentration of operating reactor and fuel cycle research facilities in the country, INL is the only national laboratory dedicated to civilian nuclear energy and the only national laboratory owned by the Department of energy (DOE) Office of Nuclear Energy (DOE-NE) When INL was launched in 2005, the first priority was to stabilize the

87

Electric and hybrid vehicle program site operator program. Quarterly progress report, January 1995--March 1995  

DOE Green Energy (OSTI)

The Site Operator Program was initially established by the Department of Energy (DOE) to incorporate the electric vehicle activities dictated by the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976. In the ensuing years, the Program has evolved in response to new legislation and interests. The Program currently includes twelve sites located in diverse geographic, metrologic, and metropolitan areas across the United States. Information is shared reciprocally with a thirteenth site, not under Program contract. The vehicles are operator-owned. The Mission Statement of the Site Operator Program includes three major activities: (1) Advancement of electric vehicle technologies; (2) Development of infrastructure elements necessary to support significant electric vehicle use; and (3) Increasing the awareness and acceptance of electric vehicles (EVs) by the public. The current participants in the Site Operator Program are shown. Table 1 indicates the EVs in each of the Site Operator fleets. Table 2 provides baseline information on several EVs currently in use by the Site Operators, or which have evolved to the point that they may be introduced in the near future. The Program is currently managed by personnel of the Electric and Hybrid Vehicle Program at the Idaho National Engineering Laboratory (INEL). The current principal management functions include: Coordination of Site Operator efforts in the areas of public awareness and infrastructure development (program-related meetings, and educational presentations).

Kiser, D.M.; Brown, H.L.

1995-08-01T23:59:59.000Z

88

Hanford Site Groundwater Monitoring for Fiscal Year 1998  

Science Conference Proceedings (OSTI)

This report presents the results of groundwater and vadose-zone monitoring and remediation for fiscal year (FY) 1998 on the Word Site, Washington. Soil-vapor extraction in the 200-West Area removed 777 kg of carbon tetrachloride in FY 1998, for a total of 75,490 kg removed since remediation began in 1992. Spectral gamma logging and evaluation of historical gross gamma logs near tank farms and liquid-disposal sites in the 200 Areas provided information on movement of contaminants in the vadose zone. Water-level monitoring was performed to evaluate groundwater-flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Water levels over most of the Hanford Site continued to decline between June 1997 and June 1998. The most widespread radiological contaminant plumes in groundwater were tritium and iodine-129. Concentrations of technetium-99, uranium, strontium-90, and carbon-14 also exceeded drinking water standards in smaller plumes. Plutonium and cesium-137 exceeded standards only near the 216-B-5 injection well. Derived concentration guide levels specified in U.S. Department of Energy Order 5400.5 were exceeded for tritium, uranium, strontium-90, and plutonium in small plumes or single wells. One well completed in the basalt-confined aquifer beneath the 200-East Area exceeded the drinking water standard for technetium-99. Nitrate is the most extensive chemical contaminant. Carbon tetrachloride, chloroform, chromium, cis-l, Z-dichloroethylene, fluoride, and trichloroethylene also were present in smaller areas at levels above their maximum contaminant levels. Cyanide concentrations were elevated in one area but were below the maximum contaminant level. Tetrachloroethylene exceeded its maximum contaminant level in several wells in the 300 Area for the first time since the 1980s. Metals such as aluminum, cadmium, iron, manganese, and nickel exceeded their maximum contaminant levels in filtered samples from numerous wells; they are believed to represent natural components of groundwater. Resource Conservation and Recovery Act of 1976 groundwater monitoring continued at 25 waste management areas during FY 1998: 17 under detection programs and data indicate that they are not adversely affecting groundwater, 6 under interim-status groundwater-quality-assessment programs to assess possible contamination, and 2 under final-status corrective-action programs. Groundwater remediation in the 100 Areas continued to reduce the amount of strontium-90 (100-N) and chromium (100-K, D, and H) reaching the Columbia River. Two systems in the 200-West Area operated to prevent the spread of carbon tetrachloride and technetide uranium plumes. Groundwater monitoring continued at these sites and at other sites where there is no active remediation. A three-dimensional, numerical groundwater model was applied to simulate radionuclide movement from sources in the 200 Areas following site closure in 2050. Contaminants will continue to move toward the southeast and north (through Gable Gap), but the areas with levels exceeding drinking water standards will diminish.

Hartman, M.J. [and others

1999-03-24T23:59:59.000Z

89

Kansas State University Electric Vehicle Site Operator Program  

SciTech Connect

During the past fifteen years Kansas State's faculty has been involved in research of alternative fuel vehicles. From formulation of fuels and automotive fuel storage to development of electronic controls, K-State's faculty research has been ongoing. With the increased awareness of what is occurring to the world's environment, the catalyst -- to ensure applied results from faculty research will occur -- has been activated. The Department of Energy's Electric Vehicle Site Operator Program is the platform being used to demonstrate international efforts to bring a more acceptable daily mode of transportation to our highways. The first new electrical vehicle procured at K-State in the last ten years, a G-Van, is a technological dinosaur. It does not incorporate leading edge control or drive systems nor does it provide the type of vehicle frame and body to meet a majority of the daily commuter needs required by the American market. Yet, this vehicle represents initial efforts to bring a federally crash certified vehicle to the commercial automotive market. As such, it is an evolutionary step in the mass production of electric vehicle products.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-01-01T23:59:59.000Z

90

Kansas State University Electric Vehicle Site Operator Program  

DOE Green Energy (OSTI)

During the past fifteen years Kansas State's faculty has been involved in research of alternative fuel vehicles. From formulation of fuels and automotive fuel storage to development of electronic controls, K-State's faculty research has been ongoing. With the increased awareness of what is occurring to the world's environment, the catalyst -- to ensure applied results from faculty research will occur -- has been activated. The Department of Energy's Electric Vehicle Site Operator Program is the platform being used to demonstrate international efforts to bring a more acceptable daily mode of transportation to our highways. The first new electrical vehicle procured at K-State in the last ten years, a G-Van, is a technological dinosaur. It does not incorporate leading edge control or drive systems nor does it provide the type of vehicle frame and body to meet a majority of the daily commuter needs required by the American market. Yet, this vehicle represents initial efforts to bring a federally crash certified vehicle to the commercial automotive market. As such, it is an evolutionary step in the mass production of electric vehicle products.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-01-01T23:59:59.000Z

91

FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Plan and Closeout Summary, Fiscal Year 2012 Operational Plan and Closeout Summary, Fiscal Year 2012 FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2012 Operational Plan FY2012 Operational Plan Closeout Summary More Documents & Publications FTCP Biennial Report - Calendar Years 2011-2012

92

FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Plan and Closeout Summary, Fiscal Year 2011 Operational Plan and Closeout Summary, Fiscal Year 2011 FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2011 Operational Plan FY2011 Operational Plan Closeout Summary More Documents & Publications FTCP Biennial Report - Calendar Years 2011-2012

93

FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2009 Operational Plan FY2009 Operational Plan - Goal 1 Summary FY2009 Operational Plan - Goal 2 Summary

94

Second site-wide five-year review of cleanup at DOE�s Idaho site  

NLE Websites -- All DOE Office Websites (Extended Search)

NEWS MEDIA CONTACT: Danielle Miller (DOE-ID) 208-526-5709 FOR IMMEDIATE RELEASE: Thursday, February 3, 2011 Second site-wide five-year review of cleanup at DOE�s Idaho site completed; report now available online An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy�s (DOE) Idaho site. �This report verifies that the performance of cleanup actions at the Idaho Site continues to be protective of human health and the environment,� said Nicole Hernandez, DOE�s project manager for the five-year review. �The findings in the report demonstrate a strong collaborative effort by CH2M-WG Idaho (CWI), DOE, the Environmental Protection Agency (EPA), and the Idaho Department of Environmental Quality

95

Monticello Mill Tailings Site Operable Unit Ill Interim Remedial Action  

Office of Legacy Management (LM)

Site Site Operable Unit Ill Interim Remedial Action Mark Perfxmed Under DOE Contrici No. DE-AC13-96CJ873.35 for th3 U.S. De[:ar!menf of Energy app~oveJioi'ptiL#ic re1ease;dCinWlionis Unlimilra' This page intentionally left blank Monticello Mill Tailings Site Operable Unit I11 Interim Remedial Action Annual Status Report August 1999 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number MSG-035-0011-00-000 Document Number Q0017700 Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC99-03 This page intentionally blank Document Number Q0017700 Acronyms Contents Page ACRONYMS .............................................................................................................................. V

96

Remotely operated excavator needs assessment/site visit summary  

SciTech Connect

The Uranium in Soils Integrated Demonstration requested an assessment of soil excavation needs relative to soil remediation. The following list identifies the DOE sites assessed: Mound Laboratory, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant, Nevada Test Site, Lawrence Livermore National Laboratory, Rocky Flats Plant, Los Alamos National Laboratory, Sandia National Laboratory, Idaho National Engineering Laboratory, Hanford Site, and Fernald Site. The reviewed sites fall into one or more of the following three categories: production, EPA National Priorities List, or CERCLA (superfund) designation. Only three of the sites appear to have the need for a remotely operated excavator rope. Hanford and Idaho Falls have areas of high-level radioactive contamination either buried or in/under buildings. The Fernald site has a need for remote operated equipment of different types. It is their feeling that remote equipment can be used to remove the health dangers to humans by removing them from the area. Most interviewees stated that characterization technologies needs are more immediate concern over excavation. In addition, the sites do not have similar geographic conditions which would aid in the development of a generic precision excavator. The sites visited were not ready to utilize or provide the required design information necessary to draft a performance specification. This creates a strong case against the development of one type of ROPE for use at these sites. Assuming soil characterization technology/methodology is improved sufficiently to allow accurate and real time field characterization then development of a precision excavator might be pursued based on FEMP needs, since the FEMP`s sole scope of work is remediation. The excavator could then be used/tested and then later modified for other sites as warranted.

Straub, J.; Haller, S.; Worsley, R. [Westinghouse Environmental Management Co. of Ohio, Cincinnati, OH (United States); King, M. [THETA Technology Inc. (United States)

1992-12-02T23:59:59.000Z

97

Hanford Site Groundwater Monitoring for Fiscal Year 2002  

SciTech Connect

This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2002 on the U.S. Department of Energy's Hanford Site in Washington State. This report is written to meet the requirements in CERCLA, RCRA, the Atomic Energy Act of 1954, and Washington State Administrative Code.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2003-02-28T23:59:59.000Z

98

Brookhaven National Laboratory site environmental report for calendar year 1996  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and summarizes information about environmental compliance for 1996. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and of a variety of radionuclides and chemical compounds in the ambient air, soil, sewage effluent, surface water, groundwater, fauna, and vegetation were made at the Brookhaven National Laboratory site and at adjacent sites. The report also evaluates the Laboratory`s compliance with all applicable guides, standards, and limits for radiological and non-radiological emissions and effluents to the environment.

Schroeder, G.L.; Paquette, D.E.; Naidu, J.R.; Lee, R.J.; Briggs, S.L.K.

1998-01-01T23:59:59.000Z

99

Site and Operations Overview 1-1 1. Site and Operations Overview  

E-Print Network (OSTI)

undertaking that produced the materials for the first atomic bombs. The reservation's role has evolved over Ridge Reservation Annual Site Environmental Report and Environmental Monitoring on the Oak Ridge." The results sum- marized in this report are based on the data col- lected prior to and through 2000. The 2000

Pennycook, Steve

100

Site and Operations Overview 1-1 1. Site and Operations Overview  

E-Print Network (OSTI)

undertaking that produced the materials for the first atomic bombs. The reservation's role has evolved over Ridge Reservation Annual Site Environmental Report and Environmental Monitoring on the Oak Ridge Protection Program." The results summa- rized in this report are based on the data collected prior

Pennycook, Steve

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Site Resources, Facilities & Operations Directorate, Brookhaven National  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Resources Division Site Resources Division Homepage The mission of the Site Resources Division is to enhance the site aesthetic so as to improve staff recruitment and retention, safety, and customer satisfaction, and to support the overall Laboratory mission. To that end, we are dedicated to providing services to the Laboratory at the highest standard per science dollar. The Site Resources Division is responsible for the following: Custodial Services BNL Recycling Program Sanitation Grounds Maintenance, including limited herbicide applications Masonry Operation and maintenance of light and heavy machine equipment, including elevators and emergency generators Rigging & Hoisting Pest control Clean-up of outdoor and select indoor spills Top of Page Last Modified: February 28, 2011

102

Strategic Petroleum Reserve site environmental report for calendar year 1997  

SciTech Connect

The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts for the US Department of Energy (DOE) Strategic Petroleum Reserve (SPR). The SER, provided annually in accordance with DOE order 5400.1, serves the public by summarizing monitoring data collected to assess how the SPR impacts the environment. The SER provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits. Included in this report is a describe of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1997. Two of these highlights include decommissioning of the Weeks Island site, involving the disposition of 11.6 million m{sup 3} (73 million barrels) of crude oil inventory, as well as the degasification of over 12.6 million m{sup 3} (79.3 million barrels) of crude oil inventory at the Big Hill and Bryan Mound facilities.

NONE

1998-11-01T23:59:59.000Z

103

Electric and hybrid vehicle program; Site Operator Program  

DOE Green Energy (OSTI)

Activities during the second quarter included the second meeting of the Site Operators in Phoenix, AZ in late April. The meeting was held in conjunction with the Solar and Electric 500 Race activities. Delivery of vehicles ordered previously has begun, although two of the operators are experiencing some delays in receiving their vehicles. Public demonstration activities continue, with an apparent increasing level of awareness and interest being displayed by the public. Initial problems with the Site Operator Database have been corrected and revised copies of the program have been supplied to the Program participants. Operating and Maintenance data is being supplied and submitted to INEL on a monthly basis. Interest in the Site Operator Program is being reflected in requests for information from several organizations from across the country, representing a wide diversity of interests. These organizations have been referred to existing Site Operators with the explanation that the program will not be adding new participants, but that most of the existing organizations are willing to work with other groups. The exception to this was the addition of Potomac Electric Power Company (PEPCO) to the program. PEPCO has been awarded a subcontract to operate and maintain the DOE owned G-Van and Escort located in Washington, DC. They will provide data on these vehicles, as well as a Solectria Force which PEPCO has purchased. The Task Force intends to be actively involved in the infrastructure development in a wide range of areas. These include, among others, personnel development, safety, charging, and servicing. Work continues in these areas. York Technical College (YORK) has completed the draft outline for the EV Technician course. This is being circulated to organizations around the country for comments. Kansas State University (KSU) is working with a private sector company to develop a energy dispensing meter for opportunity charging in public areas.

Warren, J.F.

1992-05-01T23:59:59.000Z

104

Weldon Spring Site Environmental Report for calendar year 1994  

SciTech Connect

This report for Calendar Year 1994 has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project (WSSRAP). The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The chemical plant, raffinate pits, and quarry are located on Missouri State Route 94, southwest of US Route 40/61. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site, estimates of effluent releases, and trends in groundwater contaminant levels. Additionally, applicable compliance requirements, quality assurance programs, and special studies conducted in 1994 to support environmental protection programs are discussed. Dose estimates presented in this report are based on hypothetical exposure scenarios of public use of areas near the site. In addition, release estimates have been calculated on the basis of 1994 National Pollutant Discharge Elimination System (NPDES) and air monitoring data. Effluent discharges from the site under routine NPDES and National Emission Standards for Hazardous Air Pollutants (NESHAPS) monitoring were below permitted levels.

NONE

1995-05-01T23:59:59.000Z

105

Geographic and Operational Site Parameters List (GOSPL) for Hanford Assessments  

SciTech Connect

This data package was originally prepared to support a 2004 composite analysis (CA) of low-level waste disposal at the Hanford Site. The Technical Scope and Approach for the 2004 Composite Analysis of Low Level Waste Disposal at the Hanford Site (Kincaid et. al. 2004) identified the requirements for that analysis and served as the basis for initial preparation of this data package. Completion of the 2004 CA was later deferred, with the 2004 Annual Status Report for the Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site (DOE 2005) indicating that a comprehensive update to the CA was in preparation and would be submitted in 2006. However, the U.S. Department of Energy (DOE) has recently decided to further defer the CA update and will use the cumulative assessment currently under preparation for the environmental impact statement (EIS) being prepared for tank closure and other site decisions as the updated CA. Submittal of the draft EIS is currently planned for FY 2008. This data package describes the facility-specific parameters (e.g. location, operational dates, etc.) used to numerically simulate contaminant flow and transport in large-scale Hanford assessments. Kincaid et al. (2004) indicated that the System Assessment Capability (SAC) (Kincaid et al. 2000; Bryce et al. 2002; Eslinger 2002a, 2002b) would be used to analyze over a thousand different waste sites. A master spreadsheet termed the Geographic and Operational Site Parameters List (GOSPL) was assembled to facilitate the generation of keyword input files containing general information on each waste site/facility, its operational/disposal history, and its environmental settings (past, current, and future). This report briefly describes each of the key data fields, including the source(s) of data, and provides the resulting inputs to be used for large-scale Hanford assessments.

Last, George V.; Nichols, William E.; Kincaid, Charles T.

2006-06-01T23:59:59.000Z

106

Site and Operations Overview 1-1 1. Site and Operations Overview  

E-Print Network (OSTI)

for the first atomic bombs. The reservation's role has evolved over the years, and it continues to adapt to meet Environmental Report and Environmental Monitoring on the Oak Ridge Reservation: 1998 Results are now available Environmental Protection Program." The results summarized in this report are based on the data collected prior

Pennycook, Steve

107

Site and Operations Overview 1-1 1. Site and Operations Overview  

E-Print Network (OSTI)

for the first atomic bombs. The reservation's role has evolved over the years, and it continues to adapt to meet Environmental Report and supporting data are available at http://www.ornl.gov/Env_Rpt or from the project, "Environment, Safety and Health Reporting," for an annual summary of environ- mental data to characterize

Pennycook, Steve

108

PROBLEMS ENCOUNTERED DURING FOUR YEARS OF ORR OPERATION  

SciTech Connect

The over-all design and operation of ORR is reviewed in the light of four years of operating experience. Items discussed consist of the reactor components and instrumentation, reactor and pool cooling systems (including system cleanup), the emergency systems for electric power and reactor cooling, the waste-disposal systems (liquid, gaseous, and solid), and the building, itself. The ORR was the first of a class of reactors which combined the features of both the pool-reactor and tank-reactor types. Four years of operation indicated areas where problems of various degrees have developed. These problems are discussed. (auth)

Tabor, W.H.; Costner, R.A. Jr.

1962-08-23T23:59:59.000Z

109

DOE Idaho site reaches 20-year cleanup milestone  

NLE Websites -- All DOE Office Websites (Extended Search)

IDAHO FALLS, IDAHO, 83403 IDAHO FALLS, IDAHO, 83403 Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: January 19, 2012 DOE Idaho site reaches 20-year cleanup milestone IDAHO FALLS, ID- In two decades of Superfund cleanup work, the U.S. Department of Energy's Idaho site has removed hundreds of thousands of cubic yards of radioactive and hazardously contaminated soils, excavated radioactive waste buried since the 1950s, removed three nuclear reactors and hundreds of buildings, completely closed three major nuclear facilities and removed thousands of unexploded ordnance shells and fragments. Last month marked the 20-year anniversary of the signing and implementation of a cleanup agreement between DOE, the U.S. Environmental Protection Agency and the state of Idaho. In two decades, the cleanup agreement known

110

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010  

SciTech Connect

This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

None

2011-03-01T23:59:59.000Z

111

WIPP Marks 12 Years of Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marks 12 Years of Operations Marks 12 Years of Operations WIPP Marks 12 Years of Operations March 28, 2011 - 12:00pm Addthis Media Contact Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M - On Saturday, March 26, 2011, the Department of Energy's Waste Isolation Pilot Plant marked another anniversary. It has now been 12 years since WIPP received its first shipment of transuranic (TRU) waste. TRU waste consists of clothing, tools, rags, debris, residues and other disposal items contaminated with radioactive elements - mostly plutonium. "WIPP employees and members of the community cheered when the first shipment of TRU waste arrived here in 1999," said Acting Carlsbad Field Office Manager Ed Ziemianski. "I applaud their continued dedication to our nation, which has placed its trust in WIPP to maintain those rigorous

112

Annual site environmental report for calendar year 1988  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1988 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,376 miles of transmission lines, 254 substations, and various appurtenant power facilities in the above geographic areas. Western also is responsible for planning, construction, and operation and maintenance of additional Federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service areas. Additionally, Western markets the US entitlement from the large Navajo coal-fired plant near Page, Arizona, and power generated at a wind farm in Wyoming. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

NONE

1988-12-31T23:59:59.000Z

113

Annual site environmental report for calendar year 1991  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1991 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,664 miles of transmission lines, 265 substations, and various appurtenant power facilities in fifteen central and western states. Western also is responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

NONE

1991-12-31T23:59:59.000Z

114

Annual site environmental report for calendar year 1995  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1995 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. Western operates and maintains nearly 17,000 miles of transmission lines, 257 substations, and various appurtenant power facilities in fifteen central and western states. Western is also responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may be authorized in the future. There is a combined total of 55 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has over 400 facilities located in these states, this report addresses the environmental activities in all the facilities as one site.

NONE

1995-12-31T23:59:59.000Z

115

Oak Ridge Operations Formerly Utilized Sites Remedial Action Program  

Office of Legacy Management (LM)

IC77GLg /'-Oi. SEP 20 1982 IC77GLg /'-Oi. SEP 20 1982 10-05-04B-001 Deportment of Energy Oak Ridge Operations Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 PRELIMINARY ENGINEERING EVALUATION OF REMEDIAL ACTION ALTERNATIVES BAYO CANYON SITE, LOS ALAMOS, NEW MEXICO SEPTEMBER 1982 Bechtel Job 14501 Bechtel National, Inc. Nuclear Fuel Operations LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any information, apparatus, product or process disclosed, or represents that its use

116

Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002  

Science Conference Proceedings (OSTI)

The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED).

Washington Regulatory and Environmental Services

2003-09-17T23:59:59.000Z

117

Strategic Petroleum Reserve Site Environmental Report for calendar year 1994  

Science Conference Proceedings (OSTI)

The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. The SER, provided annually in accordance with Department of Energy DOE Order 5400.1, serves the public by summarizing monitoring data collected to assess how the Strategic Petroleum Reserve (SPR) impacts the environment. This report (SER) provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits. Included in this report is a description of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1994. Two of these highlights include decommissioning of the Weeks Island facility (disposition of 73 million barrels of crude oil inventory) as well as the degasification of up to 144 million barrels of crude oil inventory at the Bayou Choctaw, Big Hill, Bryan Mound, and West Hackberry facilities. The decision to decommission the Weeks Island facility is a result of diminishing mine integrity from ground water intrusion. Degasifying the crude oil is required to reduce potentially harmful emissions that would occur during oil movements. With regard to still another major environmental action, 43 of the original 84 environmental findings from the 1992 DOE Tiger Team Assessment were closed by the end of 1994. Spills to the environment, another major topic, indicates a positive trend. Total volume of oil spilled in 1994 was only 39 barrels, down from 232 barrels in 1993, and the total volume of brine spilled was only 90 barrels, down from 370 barrels in 1993. The longer term trend for oil and brine spills has declined substantially from 27 in 1990 down to nine in 1994.

NONE

1995-05-31T23:59:59.000Z

118

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

119

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

120

Legend and legacy: Fifty years of defense production at the Hanford Site  

SciTech Connect

Today, the Hanford Site is engaged in the largest waste cleanup effort ever undertaken in human history. That in itself makes the endeavor historic and unique. The Hanford Site has been designated the ``flagship`` of Department of Energy (DOE) waste remediation endeavors. And, just as the wartime Hanford Project remains unmatched in history, no counterpart exists for the current waste cleanup enterprise. This report provides a summary of the extensive historical record, however, which does give a partial road map. The science of environmental monitoring pioneered at the Hanford Site, and records of this type are the most complete of any in the world, from private companies or public agencies, for the early years of Site operations. The Hanford Site was unique for establishing a detailed, scientific, and multi-faceted environmental monitoring program.

Gerber, M.S.

1992-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Hanford Site Groundwater Monitoring for Fiscal Year 1999  

Science Conference Proceedings (OSTI)

This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 1999 on the US. Department of Energy's Hanford Site, Washington. Water-level monitoring was performed to evaluate groundwater flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Measurements for site-wide maps were conducted in June in past years and are now measured in March to reflect conditions that are closer to average. Water levels over most of the Hanford Site continued to decline between June 1998 and March 1999. The most widespread radiological contaminant plumes in groundwater were tritium and iodine-129. Concentrations of carbon-14, strontium-90, technetium-99, and uranium also exceeded drinking water standards in smaller plumes. Cesium-137 and plutonium exceeded standards only near the 216-B-5 injection well. Derived concentration guide levels specified in US Department of Energy Order 5400.5 were exceeded for plutonium, strontium-90, tritium, and uranium in small plumes or single wells. Nitrate and carbon tetrachloride are the most extensive chemical contaminants. Chloroform, chromium, cis-1,2dichloroethylene, cyanide, fluoride, and trichloroethylene also were present in smaller areas at levels above their maximum contaminant levels. Metals such as aluminum, cadmium, iron, manganese, and nickel exceeded their maximum contaminant levels in filtered samples from numerous wells; however, in most cases, they are believed to represent natural components of groundwater. ''Resource Conservation and Recovery Act of 1976'' groundwater monitoring continued at 25 waste management areas during fiscal year 1999: 16 under detection programs and data indicate that they are not adversely affecting groundwater; 6 under interim status groundwater quality assessment programs to assess contamination; and 2 under final status corrective-action programs. Another site, the 120-D-1 ponds, was clean closed in fiscal year 1999, and monitoring is no longer required. Groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100 K, D, and H) and strontium-90 (100 N) reaching the Columbia River. The objective of two remediation systems in the 200 West Area is to prevent the spread of carbon tetrachloride and technetium-99/uranium plumes. Groundwater monitoring continued at these sites and at other sites where there is no active remediation. Subsurface source characterization and vadose zone monitoring, soil-vapor monitoring, sediment sampling and characterization, and vadose zone remediation were conducted in fiscal year 1999. Baseline spectral gamma-ray logging at two single-shell tank farms was completed, and logging of zones at tank farms with the highest count rate was initiated. Spectral gamma-ray logging also occurred at specific retention facilities in the 200 East Area. These facilities are some of the most significant potential sources of remaining vadose zone contamination. Finally, remediation and monitoring of carbon tetradoride in the 200 West Area continued, with an additional 972 kilograms of carbon tetrachloride removed from the vadose zone in fiscal year 1999.

MJ Hartman; LF Morasch; WD Webber

2000-05-10T23:59:59.000Z

122

Annual site environmental report for calendar year 1992  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1992 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy (DOE) Order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site.`` In 1992, Western provided power to 612 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, Federal and State agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provided service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas. Western is responsible for the operation and maintenance of more than 16,450 miles of transmission lines, 268 substations, 51 hydroelectric power plants, and a coal-fired power plant.

1992-12-31T23:59:59.000Z

123

Annual site environmental report for calendar year 1994  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1994 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site``. In 1994, Western provided power to more than 600 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas. Western is responsible for the operation and maintenance of nearly 17,000 miles of transmission lines, 271 substations, 55 hydroelectric power stations, and a coal-fired power plant.

1994-12-31T23:59:59.000Z

124

Fermi Large Area Telescope Operations: Progress Over 4 Years  

SciTech Connect

The Fermi Gamma-ray Space Telescope was launched into orbit in June 2008, and is conducting a multi-year gamma-ray all-sky survey, using the main instrument on Fermi, the Large Area Telescope (LAT). Fermi began its science mission in August 2008, and has now been operating for almost 4 years. The SLAC National Accelerator Laboratory hosts the LAT Instrument Science Operations Center (ISOC), which supports the operation of the LAT in conjunction with the Mission Operations Center (MOC) and the Fermi Science Support Center (FSSC), both at NASA's Goddard Space Flight Center. The LAT has a continuous output data rate of about 1.5 Mbits per second, and data from the LAT are stored on Fermi and transmitted to the ground through TDRS and the MOC to the ISOC about 10 times per day. Several hundred computers at SLAC are used to process LAT data to perform event reconstruction, and gamma-ray photon data are subsequently delivered to the FSSC for public release with a few hours of being detected by the LAT. We summarize the current status of the LAT, and the evolution of the data processing and monitoring performed by the ISOC during the first 4 years of the Fermi mission, together with future plans for further changes to detected event data processing and instrument operations and monitoring.

Cameron, Robert A.; /SLAC

2012-06-28T23:59:59.000Z

125

Overview of Nevada Test Site Radioactive and Mixed Waste Disposal Operations  

SciTech Connect

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office Environmental Management Program is responsible for carrying out the disposal of on-site and off-site generated low-level radioactive waste (LLW) and low-level radioactive mixed waste (MW) at the Nevada Test Site (NTS). Core elements of this mission are ensuring safe and cost-effective disposal while protecting workers, the public, and the environment. This paper focuses on the impacts of new policies, processes, and opportunities at the NTS related to LLW and MW. Covered topics include: the first year of direct funding for NTS waste disposal operations; zero tolerance policy for non-compliant packages; the suspension of mixed waste disposal; waste acceptance changes; DOE Consolidated Audit Program (DOECAP) auditing; the 92-Acre Area closure plan; new eligibility requirements for generators; and operational successes with unusual waste streams.

J.T. Carilli; S.K. Krenzien; R.G. Geisinger; S.J. Gordon; B. Quinn

2009-03-01T23:59:59.000Z

126

Site Operator Program Final Report for Fiscal Years 1992 through...  

NLE Websites -- All DOE Office Websites (Extended Search)

Troubleshooting electric vehicle faults * Component removal and replacement procedures * Electric vehicle safety. Field Data Collection The majority of field testing activities...

127

Brookhaven National Laboratory site environmental report for calendar year 1990  

SciTech Connect

Brookhaven National Laboratory (BNL) carries out basic and applied research in the following fields: high-energy nuclear and solid state physics; fundamental material and structure properties and the interactions of matter; nuclear medicine, biomedical and environmental sciences; and selected energy technologies. In conducting these research activities, it is Laboratory policy to protect the health and safety of employees and the public, and to minimize the impact of BNL operations on the environment. This document is the BNL environmental report for the calendar year 1990 for the safety and Environmental Protection division and corners topics on effluents, surveillance, regulations, assessments, and compliance.

Miltenberger, R.P.; Royce, B.A.; Naidu, J.R.

1992-01-01T23:59:59.000Z

128

Monticello Mill Tailings Site Operable Unit III Ecological Risk  

Office of Legacy Management (LM)

Monticello Monticello Mill Tailings Site Operable Unit III Ecological Risk Assessment September 1998 Prepared by U.S. Department of Energy Grand JunctionOffice Grand Junction, Colorado Project Number MSG-035-0004-00-000 Document Number Q0002l 00 Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC98-03 This page intentionally blank , ** 1 ( ( Document Number Q00021 00 Contents Contents Page Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. ix Executive Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. xi 1.0 Introduction I-I 2.0 Problem Formulation : 2-1 2.1 Site Description 2-1 2.1.1 Physical Setting 2-1 2.1.2 Ecological Setting '.' 2-5 2.2 Ecological Contaminants of Concern 2-9 2.3 Contaminant Fate and Transport, Ecosystems Potentially at Risk, and Complete Exposure Pathways 2-11 i3.1

129

Carbon Storage Partner Completes First Year of CO2 Injection Operations in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Storage Partner Completes First Year of CO2 Injection Storage Partner Completes First Year of CO2 Injection Operations in Illinois Carbon Storage Partner Completes First Year of CO2 Injection Operations in Illinois November 19, 2012 - 12:00pm Addthis Washington, DC - A project important to demonstrating the commercial viability of carbon capture, utilization and storage (CCUS) technology has completed the first year of injecting carbon dioxide (CO2) from an industrial plant at a large-scale test site in Illinois. Led by the Illinois State Geological Survey, the Illinois Basin-Decatur Project is the first demonstration-scale project in the United States to use CO2 from an industrial source and inject it into a saline reservoir. The CO2 is being captured from an ethanol production facility operated by the Archer Daniels Midland Company in Decatur, Ill., and is being injected

130

Brookhaven National Laboratory site environmental report for calendar year 1995  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and summarizes information about environmental compliance for 1995. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and of a variety of radionuclides and chemical compounds in the ambient air, soil, sewage effluent, surface water, groundwater, fauna, and vegetation were made at the Brookhaven National Laboratory site and at adjacent sites. The report also evaluates the Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment. Areas of known contamination are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement established by the Department of Energy, Environmental Protection Agency and the New York Department of Environmental Conservation. Except for identified areas of soil and groundwater contamination, the environmental monitoring data has continued to demonstrate that compliance was achieved with the applicable environmental laws and regulations governing emission and discharge of materials to the environment. Also, the data show that the environmental impacts at Brookhaven National Laboratory are minimal and pose no threat to the public nor to the environment. This report meets the requirements of Department of Energy Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Paquette, D.E.; Schroeder, G.L. [eds.] [and others

1996-12-01T23:59:59.000Z

131

Brookhaven National Laboratory site environmental report for calendar year 1993  

Science Conference Proceedings (OSTI)

This report documents the results of the Environmental Monitoring Program at BNL and presents summary information about environmental compliance for 1993. To evaluate the effect of BNL operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, ground water and vegetation were made at the BNL site and at sites adjacent to the Laboratory. Brookhaven National Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment were evaluated. Among the permitted facilities, two instances, of pH exceedances were observed at recharge basins, possible related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant (STP) to the Peconic River exceeded on five occasions, three for residual chlorine and one each for iron and ammonia nitrogen. The chlorine exceedances were related to a malfunctioning hypochlorite dosing pump and ceased when the pump was repaired. While the iron and ammonia-nitrogen could be the result of disturbances to the sand filter beds during maintenance. The environmental monitoring data has identified site-specific contamination of ground water and soil. These areas are subject to Remedial Investigation/Feasibility Studies (RI/FS) under the Inter Agency Agreement (IAG). Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at BNL are minimal and pose no threat to the public or to the environment. This report meets the requirements of DOE Orders 5484. 1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Royce, B.A. [eds.

1994-05-01T23:59:59.000Z

132

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

133

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

134

Site Operator technical report. Final report (1992--1996)  

DOE Green Energy (OSTI)

The Southern California Edison Company (SCE) and the US Department of Energy (DOE) entered into cooperative agreement No. DE-FC07-91ID13077 on August 23, 1991, which expired on August 3, 1996. This cooperative agreement provided SCE with DOE cofunding for participation in the DOE`s Electric and Hybrid Vehicle Site Operator Program. In return, SCE provided the DOE with quarterly progress reports which include operating and maintenance data for the electric (EVs) vehicles in SCE`s fleet. Herein is SCE`s final report for the 1992 to 1996 agreement period. As of September 1, 1996 the SCE fleet had 65 electric vehicles in service. A total of 578,200 miles had been logged. During the agreement period, SCE sent the DOE a total of 19 technical reports (Appendix B). This report summarizes the technical achievements which took place during a long, productive and rewarding, relationship with the DOE.

NONE

1996-12-01T23:59:59.000Z

135

Two Years Later: Bill Picciano of DOE's Savannah River Site ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site (SRS) - a job funded by the Recovery Act to accelerate the cleanup of the former nuclear weapons research site and make the site safe for future generations. Like too many...

136

Calendar Year 2001 Annual Site Environmental Report Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

Sandia Corporation (a subsidiary of Lockheed Martin Corporation through its contract with the U.S. Department of Energy [DOE]), National Nuclear Security Administration (NNSA) operates the Tonopah Test Range (TTR) in Nevada. Westinghouse Government Service, TTR's operations and maintenance contractor, performs most all environmental program functions. This Annual Site Environmental Report (ASER), which is published to inform the public about environmental conditions at TTR, describes environmental protection programs and summarizes the compliance status with major environmental laws and regulations during Calendar Year (CY) 2001.

VIGIL, FRANCINE S.

2002-09-01T23:59:59.000Z

137

Site environmental report for calendar year 1994, Yucca Mountain Site, Nye County, Nevada.  

Science Conference Proceedings (OSTI)

The Yucca Mountain Site Characterization office has established an environmental program to ensure that facilities are operated in order to protect, maintain, and restore environmental quality, minimize potential threats to the environment and the public, and comply with environmental policies and US DOE orders. The status of the environmental program has been summarized in this annual report to characterize performance, confirm compliance with environmental requirements, and highlight significant programs and efforts during CY 1994. Monitoring, archaeology, groundwater, ecosystems, tortoise conservation, waste minimization, etc., are covered.

NONE

1995-06-01T23:59:59.000Z

138

Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)  

SciTech Connect

During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs.

1987-06-01T23:59:59.000Z

139

Brookhaven National Laboratory site environmental report for calendar year 1989  

Science Conference Proceedings (OSTI)

The environmental monitoring program is conducted by the Environmental Protection Section of the Safety and Environmental Protection (S EP) Division to determine whether operation of BNL facilities have met the applicable environmental standards and effluent control requirements. This program includes monitoring for both radiological and nonradiological parameters. This report summarizes the data for the external radiation levels; radioactivity in air, rain, potable water, surface water, ground water, soil, vegetation, and aquatic biota; water quality, metals, organics and petroleum products in ground water, surface water and potable water. Analytical results are reviewed by the S EP staff and when required by permit conditions are transmitted to the appropriate regulatory agencies. The data were evaluated using the appropriate environmental regulatory criteria. Detailed data for the calendar year 1989 are presented. 27 figs.

Miltenberger, R.P.; Royce, B.A.; Chalasani, S.S.; Morganelli, D.; Naidu, J.R.

1990-12-01T23:59:59.000Z

140

BROOKHAVEN NATIONAL LABORATORY SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 1994.  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and presents summary information about environmental compliance for 1994. To evaluate the effect of Brookhaven National Laboratory's operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, groundwater, fauna and vegetation were made at the Brookhaven National Laboratory site and at sites adjacent to the Laboratory. Brookhaven National Laboratory's compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment were evaluated. Among the permitted facilities, two instances of pH exceedances were observed at recharge basins, possibly related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant to the Peconic River exceeded. on ten occasions, one each for fecal coliform and 5-day Biochemical Oxygen Demand (avg.) and eight for ammonia nitrogen. The ammonia and Biochemical Oxygen Demand exceedances were attributed to the cold winter and the routine cultivation of the sand filter beds which resulted in the hydraulic overloading of the filter beds and the possible destruction of nitrifying bacteria. The on-set of warm weather and increased aeration of the filter beds via cultivation helped to alleviate this condition. The discharge of fecal coliform may also be linked to this occurrence, in that the increase in fecal coliform coincided with the increased cultivation of the sand filter beds. The environmental monitoring data has identified site-specific contamination of groundwater and soil. These areas are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement. Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at Brookhaven National Laboratory are minimal and pose no threat to the public or to the environment. This report meets the requirements of Department of Energy Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

NAIDU,J.R.; ROYCE,B.A.

1995-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Internal Site Office Operations | U.S. DOE Office of Science...  

Office of Science (SC) Website

(113KB) Federal Stewardship Internal Site Office Operations Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Ames Site...

142

Nevada Test Site annual site environmental report for calendar year 1998  

Science Conference Proceedings (OSTI)

Prior to 1989, annual reports of environmental monitoring and assessment results for the Nevada Test Site (NTS) were prepared in two separate parts. Onsite effluent monitoring and environmental monitoring results were reported in an onsite report prepared by the US Department of Energy, Nevada Operations Office (DOE/NV). Results of the Offsite Radiological Surveillance and Long-Term Hydrological Monitoring Programs conducted by the US Environmental Protection Agency's (EPA) Laboratory (various names) in Las Vegas, Nevada, were reported separately by that Agency. Beginning with the 1989 Annual Site Environmental Report for the NTS, these two documents were combined into a single report to provide a more comprehensive annual documentation of the environmental protection activities conducted for the nuclear testing program and other nuclear and non-nuclear operations at the NTS. The two agencies have coordinated preparation of this tenth combined onsite and offsite report through sharing of information on environmental surveillance and releases as well as meteorological, hydrological, and other supporting data used in dose-estimation calculations.

Black, S.C.; Townsend, Y.E.

1999-10-01T23:59:59.000Z

143

Nevada Test Site Annual Site Environmental Report for Calendar Year - 1999  

SciTech Connect

Prior to 1989, annual reports of environmental monitoring and assessment results for the Nevada Test Site (NTS) were prepared in two separate parts. Onsite effluent monitoring and environmental monitoring results were reported in an onsite report prepared by the U.S. Department of Energy, Nevada Operations Office (DOE/NV). Results of the Offsite Radiological Surveillance and Long-Term Hydrological Monitoring programs conducted by the U.S. Environmental Protection Agency's (EPA's) Laboratory (various names) in Las Vegas, Nevada, were reported separately by that Agency. Beginning with the 1989 Annual Site Environmental Report for the NTS, these two documents were combined into a single report to provide a more comprehensive annual documentation of the environmental protection activities conducted for the nuclear testing program and other nuclear and non-nuclear operations at the NTS. The two agencies have coordinated preparation of this eleventh combined onsite and offsite report through sharing of information on environmental surveillance and releases as well as meteorological, hydrological, and other supporting data used in dose-estimation calculations.

Townsend, Y.E.; Grossman, R.F.

2000-10-01T23:59:59.000Z

144

Nevada Test Site Annual Site Environmental Report for Calendar Year - 1999  

SciTech Connect

Prior to 1989, annual reports of environmental monitoring and assessment results for the Nevada Test Site (NTS) were prepared in two separate parts. Onsite effluent monitoring and environmental monitoring results were reported in an onsite report prepared by the U.S. Department of Energy, Nevada Operations Office (DOE/NV). Results of the Offsite Radiological Surveillance and Long-Term Hydrological Monitoring programs conducted by the U.S. Environmental Protection Agency's (EPA's) Laboratory (various names) in Las Vegas, Nevada, were reported separately by that Agency. Beginning with the 1989 Annual Site Environmental Report for the NTS, these two documents were combined into a single report to provide a more comprehensive annual documentation of the environmental protection activities conducted for the nuclear testing program and other nuclear and non-nuclear operations at the NTS. The two agencies have coordinated preparation of this eleventh combined onsite and offsite report through sharing of information on environmental surveillance and releases as well as meteorological, hydrological, and other supporting data used in dose-estimation calculations.

Townsend, Y.E.; Grossman, R.F.

2000-10-01T23:59:59.000Z

145

Coal operators prepare for a prosperous new year  

Science Conference Proceedings (OSTI)

Results are given of the Coal Age 2008 annual Forecast Survey of 17 coal mining executives which reinforces that 2008 could be a very good year. Coal operators are planning to invest in new equipment, development and new coal mine start-ups, based on a number of demand- and supply-side fundamentals. 71% of those surveyed thought coal production in 2008 would increase from 2007 levels and US exports are expected to climb due to the weak dollar. If the tax credit on synfuels expires on 31 December 2007 production of coal synfuel will likely cease. Asked about expensive planned purchases, companies answers ranged from $80,000 for an underground scoop to $500 m for a new mine installation. However, most producers admit they will not be able to operate at full capacity. 7 figs.

Fiscor, S.

2008-01-15T23:59:59.000Z

146

Hanford Site Rare Plant Monitoring Report for Calendar Year 2012  

SciTech Connect

Two patches of Columbian yellowcress on the Hanford Reach were visited in both 2011 and 2012 to compare ramet counts between years: near Allerd Pumphouse (Rkm 615.4) and near White Bluffs Boat Launch (Rkm 593.3) (Figure 3). In 2012, the population near Allerd Pumphouse had 45 ramets present within a 5x3 m area. At the same population in 2011, there were 60 ramets. In 2012, the population near White Bluffs Boat Launch had 105 ramets in a 2x2 m area. At the same population in 2011, there were 100 ramets. This data shows that while annual variability does exist, ramet counts were relatively similar from 2011 to 2012. This is likely due to the similar flow regimes of 2011 and 2012, which both had above average snowpack, high flows, and extended spring flooding seasons. A total of 19.6 miles (31.5 km) of the Hanford shoreline were surveyed in 2012, with ten patches identified and approximately 1,250 ramets counted. It is not known how many individual plants this count represents due to the rhizomatous nature of the species. Two of these sites were identified previously in the WNHP database, and the remaining eight were newly identified locations. Eleven of the ramets had flowers and/or buds in the patches located during 2012, but no fruits were found

Salstrom, D; Easterly, R; Lindsey, Cole T.; Nugent, John J.

2013-03-21T23:59:59.000Z

147

Hanford Site Environmental Report for Calendar Year 2008  

Science Conference Proceedings (OSTI)

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2009 information is included where appropriate.

Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

2009-09-15T23:59:59.000Z

148

Hanford Site Environmental Report for Calendar Year 2007  

Science Conference Proceedings (OSTI)

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights signifi cant environmental and public protection programs and efforts. Some historical and early 2008 information is included where appropriate.

Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

2008-06-05T23:59:59.000Z

149

Hanford Site Environmental Report for Calendar Year 2009  

Science Conference Proceedings (OSTI)

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2010 information is included where appropriate.

Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

2010-09-01T23:59:59.000Z

150

Twenty-Five Year Site Plan FY2013 - FY2037  

SciTech Connect

Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.

Jones, William H. [Los Alamos National Laboratory

2012-07-12T23:59:59.000Z

151

Twenty-Five Year Site Plan FY2013 - FY2037  

SciTech Connect

Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.

Jones, William H. [Los Alamos National Laboratory

2012-07-12T23:59:59.000Z

152

Calendar year 2002 annual site environmental report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii.  

SciTech Connect

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, oversees TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2002. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 5400.1, General Environmental Protection Program (DOE 1990) and DOE Order 231.1, Environment, Safety, and Health Reporting (DOE 1996).

Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie; Koss, Susan I.; Salinas, Stephanie A.

2003-09-01T23:59:59.000Z

153

Calendar year 2003 : annual site enviromental report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii.  

SciTech Connect

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, manages TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2003. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2003) and DOE Order 231.1 Chg 2., Environment, Safety, and Health Reporting (DOE 1996).

Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie; Koss, Susan I.; Salinas, Stephanie A.

2004-09-01T23:59:59.000Z

154

Westinghouse Hanford Company operational environmental monitoring annual report - calendar year 1995  

SciTech Connect

This document summarizes the results of the Westinghouse Hanford Company (WHC) near-facility operational environmental monitoring for 1995 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air, surface water,groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

Schmidt, J.W., Westinghouse Hanford

1996-07-30T23:59:59.000Z

155

Westinghouse Hanford Company operational environmental monitoring annual report, calendar year 1994  

SciTech Connect

This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1994 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

Schmidt, J.; Fassett, J.W.; Johnson, A.R.; Johnson, V.G.; Markes, B.M.; McKinney, S.M.; Moss, K.J.; Perkins, C.J.; Richterich, L.R.

1995-08-01T23:59:59.000Z

156

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.  

DOE Green Energy (OSTI)

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

Wick, Mike

2008-12-30T23:59:59.000Z

157

Southwestern Power Administration site environmental report for calendar year 1993  

DOE Green Energy (OSTI)

During CY 93, Southwestern was not involved in any programs that had a direct effect on the environment, involving endangered species, protection of wetlands, or increased electromagnetic radiation. Southwestern continued to function throughout the year in an operations and maintenance posture with minor substation projects. Southwestern received an environmental management audit by the Department of Energy`s Office of Environmental Audit (EH-24), during CY 1992. The purpose of the audit was to give Southwestern, DOE headquarters, and the Secretary an indication of the status of Southwestern management`s effectiveness in discharging its duties in an environmentally responsible manner. The audit identified 17 findings. An action plan was developed and remediation of the findings has been accomplished. Several strengths were identified during the audit with regard to the environmental programs at Southwestern. Most importantly, senior management at Southwestern has taken actions to increase environmental awareness throughout the organization which is evidenced by the creation of the Environmental, Safety, Health, and Security Office.

Not Available

1994-06-01T23:59:59.000Z

158

Hanford Site Environmental Report for Calendar Year 2002  

SciTech Connect

This report is prepared annually to satisfy the requirements of DOE Orders. The report provides an overview of activities at the Hanford Site during 2002 and demonstrates the site's compliance with applicable federal, state, and local environmental laws, regulations, executive orders, and DOE policies; and to summarize environmental data that characterize Hanford Site environmental management performance. The purpose of the report is to provide useful summary information to members of the public, public officials, regulators, Hanford contractors, and elected representatives.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2003-09-01T23:59:59.000Z

159

Hazelwood Interim Storage Site environmental surveillance report for calendar year 1993  

SciTech Connect

This report summarizes the results of environmental surveillance activities conducted at the Hazelwood Interim Storage Site (HISS) during calendar year 1993. It includes an overview of site operations, the basis for monitoring for radioactive and non-radioactive parameters, summaries of environmental program at HISS, a summary of the results, and the calculated hypothetical radiation dose to the offsite population. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. The US Department of Energy (DOE) began environmental monitoring of HISS in 1984, when the site was assigned to DOE by Congress through the energy and Water Development Appropriations Act and subsequent to DOE`s Formerly Utilized Sites Remediation Action Program (FUSRAP). Contamination at HISS originated from uranium processing work conducted at Mallinckrodt Chemical Works at the St. Louis Downtown Site (SLDS) from 1942 through 1957.

1994-06-01T23:59:59.000Z

160

Colonie Interim Storage Site environmental surveillance report for calendar year 1993  

SciTech Connect

This report summarizes the results of environmental surveillance activities conducted at the Colonie Interim Storage Site (CISS) during calendar year 1993. It includes an overview of site operations, the basis for radiological and nonradiological monitoring, dose to the offsite population, and summaries of environmental programs at CISS. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. Appendix A contains a discussion of the nature of radiation, the way it is measured, and common sources of it. The primary environmental guidelines and limits applicable to CISS are given in US Department of Energy (DOE) orders and mandated by six federal acts: the Clean Air Act; the Clean Water Act; the Resource Conservation and Recovery Act (RCRA); the Toxic Substances Control Act; the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); and the National Environmental Policy Act (NEPA). DOE began environmental monitoring of CISS in 1984 when DOE was authorized by Congress through the Energy and Water Development Appropriations Act to conduct a decontamination research and development program at the site. The site was subsequently assigned to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP).

1994-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Hanford Site Environmental Report for Calendar Year 2010  

Science Conference Proceedings (OSTI)

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2011 information is included where appropriate.

Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

2011-07-12T23:59:59.000Z

162

Hanford Site environmental report for calendar year 1989  

Science Conference Proceedings (OSTI)

This report is a summary of the environmental status of the Hanford Site in 1989. It includes descriptions of the Site and its mission, the status of compliance with environmental regulations, planning and activities to accomplish compliance, environmental protection and restoration activities, and environmental monitoring. 97 refs., 67 figs., 14 tabs.

Jaquish, R.E.; Bryce, R.W. (eds.)

1990-05-01T23:59:59.000Z

163

Two Years Later: Bill Picciano of DOE's Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE))

We checked back in with Bill Picciano, who we last spoke to in October 2009 after he'd recently been hired at the Savannah River Site (SRS) through the Recovery Act. Now he's permanently employed at the Site as an Associate Engineer/Technical Support Specialist - a job he's proud to have.

164

Paducah and Portsmouth Sites Advance Operations at DUF6 Plants | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Portsmouth Sites Advance Operations at DUF6 Plants and Portsmouth Sites Advance Operations at DUF6 Plants Paducah and Portsmouth Sites Advance Operations at DUF6 Plants November 1, 2011 - 12:00pm Addthis First cylinder enters plant. First cylinder enters plant. Paducah and Portsmouth Sites Advance Operations at DUF6 Plants First cylinder enters plant. Paducah and Portsmouth Sites Advance Operations at DUF6 Plants Paducah and Portsmouth - Babcock & Wilcox Conversion Services (BWCS) began work at the Paducah and Portsmouth sites in March with the goal of making two depleted uranium hexafluoride (DUF6) conversion plants fully operational. The DOE site operations contactor achieved that goal at 3:43 p.m. Sept. 30 when all seven conversion lines at the plants were designated fully operational. "Our next goal is to bring all seven lines to steady state commercial

165

Annual site environmental report for calendar year 1994  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1994 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site.``

NONE

1994-12-31T23:59:59.000Z

166

Annual site environmental report for calendar year 1989  

DOE Green Energy (OSTI)

The Western Area Power Administration has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved within 1989 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has numerous facilities located in fifteen states, this report was written to address the environmental activities in all of the facilities as one ``site.``

NONE

1996-03-01T23:59:59.000Z

167

Hanford Site Environmental Report for calendar year 1992  

SciTech Connect

This report is prepared annually to summarize environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations at the Hanford Site. The following sections: describe the Hanford Site and its mission; summarize the status in 1992 of compliance with environmental regulations; describe the environmental programs at the Hanford Site; discuss public dose estimates from 1992 Hanford activities; present information on effluent monitoring and environmental surveillance, including ground-water protection and monitoring, and discuss activities to ensure quality.

Woodruff, R.K.; Hanf, R.W.; Lundgren, R.E. [eds.

1993-06-01T23:59:59.000Z

168

Hanford Site Environmental Report for Calendar Year 2000  

Science Conference Proceedings (OSTI)

This Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2001-09-25T23:59:59.000Z

169

Hanford Site Environmental Report for Calendar Year 1999  

Science Conference Proceedings (OSTI)

The Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.

2000-09-28T23:59:59.000Z

170

Hanford Site Groundwater Monitoring for Fiscal Year 2006  

SciTech Connect

This report presents the results of groundwater monitoring for FY 2006 on DOE's Hanford Site. Results of groundwater remediation, vadose zone monitoring, and characterization are summarized. DOE monitors groundwater at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act (AEA), the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), and Washington Administrative Code (WAC).

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2007-03-01T23:59:59.000Z

171

SP-100 operational life model. Fiscal Year 1990 annual report  

DOE Green Energy (OSTI)

This report covers the initial year`s effort in the development of an Operational Life Model (OLM) for the SP-100 Space Reactor Power System. The initial step undertaken in developing the OLM was to review all available documentation from GE on their plans for the OLM and on the degradation and failure mechanisms envisioned for the SP-100. In addition, the DEGRA code developed at JPL, which modelled the degradation of the General Purpose Heat Source based Radioisotope Thermoelectric Generator (GPHS-RTG), was reviewed. Based on the review of the degradation and failure mechanisms, a list of the most pertinent degradation effects along with their key degradation mechanisms was compiled. This was done as a way of separating the mechanisms from the effects and allowing all of the effects to be incorporated into the OLM. The emphasis was on parameters which will tend to change performance as a function of time and not on those that are simply failures without any prior degradation.

Ewell, R.; Awaya, H.

1990-12-14T23:59:59.000Z

172

DOE - Office of Legacy Management -- Tatum Salt Dome Test Site...  

Office of Legacy Management (LM)

Tatum Salt Dome Test Site - MS 01 FUSRAP Considered Sites Site: Tatum Salt Dome Test Site (MS.01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site...

173

DOE - Office of Legacy Management -- Exxon Ray Point Site - 032  

Office of Legacy Management (LM)

Exxon Ray Point Site - 032 FUSRAP Considered Sites Site: Exxon Ray Point Site (032) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition:...

174

Nevada Test Site annual site environmental report for calendar year 1997  

Science Conference Proceedings (OSTI)

Monitoring and surveillance, on and around the Nevada Test Site, (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1997, indicated that operations on the NTS were conducted in compliance with applicable DOE, state, and federal regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of liquid effluents, or resuspension of soil was not detectable offsite, and exposure above existing background to members of the offsite population was not measured by the offsite monitoring program. Using the US Environmental Protection Agency`s (EPA`s) Clean Air Package 1988 (CAP88)-PC model and NTS radionuclide emissions and environmental monitoring data, the calculated effective dose equivalent (EDE) to the maximally exposed individual offsite would have been 0.089 mrem. Hazardous wastes were shipped offsite to approved disposal facilities.

Black, S.C.; Townsend, Y.E. [eds.

1998-10-01T23:59:59.000Z

175

Nevada test site annual site environmental report for calendar year 1995  

SciTech Connect

Monitoring and surveillance on and around the Nevada Test Site (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1995 indicated that operations on the NTS were conducted in compliance with applicable federal and DOE regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of effluents, or resuspension was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act (NEPA) is being achieved and, where mandated, permits for air and water effluents and waste management have been obtained from the appropriate agencies. Cooperation with other agencies has resulted in seven different consent orders and agreements. Support facilities at off-NTS locations complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

NONE

1996-09-01T23:59:59.000Z

176

Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary  

SciTech Connect

This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

Not Available

1991-09-01T23:59:59.000Z

177

Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary  

SciTech Connect

This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

1991-09-01T23:59:59.000Z

178

EIS-0426: Site-Wide Environmental Impact Statement for Continued Operation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Site-Wide Environmental Impact Statement for Continued 6: Site-Wide Environmental Impact Statement for Continued Operation of the Department of Energy / National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada EIS-0426: Site-Wide Environmental Impact Statement for Continued Operation of the Department of Energy / National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada Summary This Site-Wide EIS evaluates the potential environmental impacts of proposed alternatives for continued management and operation of the Nevada National Security Site (NNSS) (formerly known as the Nevada Test Site) and other U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA)-managed sites in Nevada.

179

Idaho National Laboratory Ten-Year Site Plan Project Description Document  

SciTech Connect

This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

Not Listed

2012-03-01T23:59:59.000Z

180

Idaho National Laboratory Ten-Year Site Plan Project Description Document  

SciTech Connect

This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

Not Listed

2012-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Annual Site Environmental Report for Calendar Years 2005-2006  

SciTech Connect

Contained in the following report are data for radioactivity in the environment collected and analyzed by Princeton Plasma Physics Laboratory's Princeton Environmental, Analytical, and Radiological Laboratory (PEARL). The PEARL is located on-site and is certified for analyzing radiological and non-radiological parameters through the New Jersey Department of Environmental Protection's Laboratory Certification Program, Certification Number 12471. Non-radiological surface and ground water samples are analyzed by NJDEP certified subcontractor laboratories - QC, Inc. and Accutest Laboratory. To the best of our knowledge, these data, as contained in the "Annual Site Environmental Report for 2005 and 2006," are documented and certified to be correct.

Virginia L. Finley

2010-01-25T23:59:59.000Z

182

Hanford Site environmental report for calendar year 1995  

SciTech Connect

The Hanford Site Environmental Report is prepared annually to summarize environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations. It also highlights environmental programs and efforts. It is written to meet reporting requirements and guidelines of DOE and to meet the needs of the public. Individual sections are designed to describe the Hanford Site and its mission, summarize the status in 1995 of compliance, describe the environmental programs, discuss estimated radionuclide exposure to the public from 1995 Hanford activities, present information on effluent monitoring and environmental surveillance (including ground- water protection and monitoring), and discuss activities to ensure quality.

Dirkes, R.L.; Hanf, R.W. [eds.] [Pacific Northwest National Lab., Richland, WA (United States)] [eds.; Pacific Northwest National Lab., Richland, WA (United States)

1996-06-01T23:59:59.000Z

183

Hanford Site environmental report for calendar year 1991  

Science Conference Proceedings (OSTI)

This report of the Hanford Reservation is prepared annually to summarize environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations. The report also highlights major environmental programs and efforts. The following sections: describe the Hanford Site and its mission; summarize the status in 1991 of compliance with environmental regulations; describe the environmental programs at the Hanford Site; present information on environmental surveillance and the ground-water protection and monitoring program; and discuss activities to ensure quality.

Woodruff, R.K.; Hanf, R.W.; Lundgren, R.E. (eds.)

1992-06-01T23:59:59.000Z

184

Thirty-five years at Pajarito Canyon Site  

SciTech Connect

A history of the research activities performed at the Pajarito Canyon Site from 1946 to 1981 is presented. Critical assemblies described include: the Topsy assembly; Lady Godiva; Godiva 2; Jezebel; Flattop; the Honeycomb assembly for Rover studies; Kiwi-TNT; PARKA reactor; Big Ten; and Plasma Cavity Assembly.

Paxton, H.C.

1981-05-01T23:59:59.000Z

185

Operational Awareness Site Visi to the Pantex Plant, October...  

NLE Websites -- All DOE Office Websites (Extended Search)

Activity Report - Rev. 0 Report Number: HIAR PTX-2011-10-28 Site: Pantex Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations...

186

U-276: VMware vCenter Operations Cross-Site Scripting Vulnerability |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76: VMware vCenter Operations Cross-Site Scripting Vulnerability 76: VMware vCenter Operations Cross-Site Scripting Vulnerability U-276: VMware vCenter Operations Cross-Site Scripting Vulnerability October 8, 2012 - 7:00am Addthis PROBLEM: VMware vCenter Operations Cross-Site Scripting Vulnerability PLATFORM: VMware vCenter Operations 1.x ABSTRACT: A vulnerability has been reported in VMware vCenter Operations, which can be exploited by malicious people to conduct cross-site scripting attacks. reference LINKS: Original Advisory Secunia Advisory SA50795 CVE-2012-5050 IMPACT ASSESSMENT: Medium Discussion: Certain unspecified input is not properly sanitised before being returned to the user. This can be exploited to execute arbitrary HTML and script code in a user's browser session in context of an affected site. Impact: A vulnerability in VMware vCenter Operations, which can be exploited to

187

Waste Isolation Pilot Plant Site Environmental Report for calendar year 1989  

Science Conference Proceedings (OSTI)

This is the 1989 Site Environmental Report (SER) for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP is a government owned and contractor-operated facility. The WIPP project is operated by Westinghouse Electric Corporation for the US Department of Energy (DOE). The mission of the WIPP is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) waste generated by the defense activities of the US Government. This report provides a comprehensive description of environmental activities at the WIPP during calendar year 1989. The WIPP facility will not receive waste until all concerns affecting opening the WIPP are addressed to the satisfaction of the Secretary of Energy. Therefore, this report describes the status of the preoperational activities of the Radiological Environmental Surveillance (RES) program, which are outlined in the Radiological Baseline Program for the Waste Isolation Pilot Plant (WTSD-TME-057). 72 refs., 13 figs., 20 tabs.

Not Available

1989-01-01T23:59:59.000Z

188

Safety implications from 20 years of operating experience at EBR-II  

Science Conference Proceedings (OSTI)

EBR-II recently passed a major milestone in its operating history, 20 years of operation on August 13, 1984. The plant has gone through three major program phases during this time and is now entering a fourth. Those are: (1) demonstration of the feasibility of a complete LMFBR power plant, including on-site reprocessing of metal fuel, (2) irradiation testing of fuels and materials to support core and fuel design for CRBR and FFTF, (3) operational-safety testing to establish and demonstrate the inherent safety of LMFBRs and now, (4) the integration of this technology into demonstration of the integral fast reactor (IFR) concept. As EBR-II has progressed through these phases, much has been learned that is relevant to fast-reactor safety.

Sackett, J.I.; Buschman, H.W.

1985-01-01T23:59:59.000Z

189

Four years of operations and results with FORTE  

DOE Green Energy (OSTI)

The FORTE (Fast Onboard Recording of Transient Events) satellite was launched on 29 August 1997 and has been in continuous operation since that time. FORTE was placed in a nearly circular, 825-km-altitude, 70 degrees inclination orbit by a Pegasus rocket funded by Air Force Space Test Program. The Department of Energy funded the FORTE satellite, which was designed and built at Los Alamos. FORTE's successful launch and engineered robustness were a result of several years of dedicated work by the joint Los Alamos National Laboratory/Sandia National Laboratory project team, led through mission definition, payload and satellite development, and launch by Dr. Stephen Knox. The project is now led by Dr. Abram Jacobson. FORTE carries a suite of instruments, an optical system and a rf system, for the study of lightning and anthropogenic signals. As a result of this effort, new understandings of lightning events have emerged as well as a more complete understanding of the relationship between optical and rf lightning events. This paper will provide an overview of the FORTE satellite and will discuss the on orbit performance of the subsystems.

Klingner, P. L. (Phillip L.); Carlson, L. D. (Leslie D.); Dingler, R. D. (Robert D.); Esch-Mosher, D. M. (Diana M.); Jacobson, A. R.; Roussel-Dupre, D. (Diane)

2001-01-01T23:59:59.000Z

190

FOUR YEARS OF OPERATIONS AND RESULTS WITH FORTE  

DOE Green Energy (OSTI)

The FORTE (Fast Onboard Recording of Transient Events) satellite was launched on 29 August 1997 and has been in continuous operation since that time. FORTE was placed in a nearly circular, 825-km-altitude, 70 degrees inclination orbit by a Pegasus rocket funded by Air Force Space Test Program. The Department of Energy funded the FORTE satellite, which was designed and built at Los Alamos. FORTE's successful launch and engineered robustness were a result of several years of dedicated work by the joint Los Alamos National Laboratory/Sandia National Laboratory project team, led through mission definition, payload and satellite development, and launch by Dr. Stephen Knox. The project is now led by Dr. Abram Jacobson. FORTE carries a suite of instruments, an optical system and a rf system, for the study of lightning and anthropogenic signals. As a result of this effort, new understandings of lightning events have emerged as well as a more complete understanding of the relationship between optical and rf lightning events. This paper will provide an overview of the FORTE satellite and will discuss the on orbit performance of the subsystems.

D. ROUSSEL-DUPRE; P. KLINGNER; L. CARLSON; ET AL

2001-06-01T23:59:59.000Z

191

Annual site environmental report for calendar year 1997  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. Because Western has over 400 facilities located in 15 states, this report addresses the environmental activities in all the facilities as one site. In March, 1996, Western established a team representing each of the four Regional Offices, the CRSP Customer Service Center and the Corporate Service Office to develop an Environmental Management System based on the guidelines in ISO 14001. The significant environmental projects and issues Western was involved with in 1997 are discussed in this annual site environmental report. This report is written to show the nature and effectiveness of the environmental protection program.

NONE

1997-12-31T23:59:59.000Z

192

Hanford Site Environmental Report for Calendar Year 2003  

SciTech Connect

This report is published each year by DOE to summarize environmental data and information, describe environmental management performance, demonstrate the status of compliance with environmental regulations, and highlight major environmental programs and efforts.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2004-09-01T23:59:59.000Z

193

Hanford Site environmental report for calendar year 1996  

SciTech Connect

The Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts. The report is written to meet requirements and guidelines of the U.S. Department of Energy (DOE) and to meet the needs of the public. This summary has been written with a minimum of technical terminology.

Dirkes, R.L.; Hanf, R.W. [eds.] [eds.

1997-08-01T23:59:59.000Z

194

Annual site environmental report for calendar year 1986  

DOE Green Energy (OSTI)

The Western Area Power Administration has established an effective formal environmental protection, auditing, and monitoring program which has been in effect since 1978. This annual site environmental report discusses the significant environmental projects and issues Western was involved with in 1986, and it is written to demonstrate the nature and effectiveness of the environmental protection program. Western has numerous facilities located in 15 states. This report was written to address all the facilities.

NONE

1987-05-01T23:59:59.000Z

195

Nevada Test Site annual site environmental report for calendar year 1996  

SciTech Connect

Monitoring and surveillance on and around the Nevada Test Site (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1996 indicated that operations on the NTS were conducted in compliance with applicable DOE, state, and federal regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of liquid effluents, or resuspension of soil was not detectable offsite, and exposure above background to members of the offsite population was not measured by the offsite monitoring program. Using the US Environmental Protection Agency`s (EPA) Clean Air Package 1988 (CAP88)PC model and NTS radionuclide emissions and environmental monitoring data, the calculated effective dose equivalent (EDE) to the maximally exposed individual offsite would have been 0.11 mrem. This value is less than 2 percent of the federal dose limit prescribed for radionuclide air emissions. Any person receiving this dose would also have received 144 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act (NEPA) is being achieved and, where mandated, permits for air and water effluents and waste management have been obtained from the appropriate agencies. Cooperation with other agencies has resulted in seven different consent orders and agreements. Support facilities at off-NTS locations have complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits as mandated for each location.

Black, S.C.; Townsend, Y.E. [eds.

1997-10-01T23:59:59.000Z

196

Annual site environmental report for calendar year 1991  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1991 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has numerous facilities located in 15 states, this report was written to address the environmental activities in all of the facilities as one ``site``. In 1991, Western provided power to 615 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas.

1991-12-31T23:59:59.000Z

197

Annual site environmental report for calendar year 1993  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1993 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 States, this report addresses the environmental activities in all the facilities as one ``site``. In 1993, Western provided power to more than 600 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas.

1993-12-31T23:59:59.000Z

198

Hazelwood Interim Storage Site environmental report for calendar year 1992, 9200 Latty Avenue, Hazelwood, Missouri  

SciTech Connect

This report describes the environmental surveillance program at the Hazelwood Interim storage Site (HISS) and surrounding area, provides the results for 1992, and discusses applicable environmental standards and requirements with which the results were compared. HISS is located in eastern Missouri in the City of Hazelwood (St. Louis County) and occupies approximately 2.2 ha (5.5 acres). Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), which was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. In 1992 there were no environmental occurrences or unplanned contaminant releases as defined in DOE requirements and in the Superfund Amendment and Reauthorization Act (SARA) Title III of CERCLA.

Not Available

1993-05-01T23:59:59.000Z

199

Summary of the Hanford Site Environmental Report for Calendar Year 2005  

Science Conference Proceedings (OSTI)

This small booklet provides highlights of the environmental monitoring at the Hanford Site during 2005. It is a summary of the information contained in the larger report: Hanford Site Environmental Monitoring for Calendar Year 2005.

Hanf, Robert W.; Morasch, Launa F.; Poston, Ted M.; Dirkes, Roger L.

2006-09-28T23:59:59.000Z

200

Pinellas Plant annual site environmental report for calendar year 1993  

Science Conference Proceedings (OSTI)

Martin Marietta Specialty Components, Inc., and the US Department of Energy are committed to successfully administering a high quality Environmental Management Program at the Pinellas Plant in Pinellas County, Florida. Part of this commitment includes accurately documenting and communicating to the Pinellas Plant stakeholder the results of their environmental compliance and monitoring activities. The Annual Site Environmental Report presents a comprehensive summary of the results of the environmental monitoring, waste management, and environmental restoration programs at the Pinellas Plant for 1993. This report also includes the plant`s performance in the areas of compliance with applicable regulatory requirements and standards and identifies major environmental management program initiatives and accomplishments for 1993.

Not Available

1994-06-10T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Annual Site Environmental Report for Calendar Year 2004  

SciTech Connect

This report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory's (PPPL) operations. The results of the 2004 environmental surveillance and monitoring program for PPPL's are presented and discussed. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2004.

V. Finley

2009-03-26T23:59:59.000Z

202

Brookhaven National Laboratory site environmental report for calendar year 1991  

Science Conference Proceedings (OSTI)

This publication presents the results of BNL`s environmental monitoring and compliance effort and provides an assessment of the impact of Brookhaven National Laboratory (BNL) operations on the environment. This document is the responsibility of the Environmental Protection Section of the Safety and Envirorunental Protection Division. Within this Section, the Environmental Monitoring Group (EMG) sample the environment, interpreted the results, performed the impact analysis of the emissions from BNL, and compiled the information presented here. In this effort, other groups of the Section: Compliance; Analytical; Ground Water; and Quality played a key role in addressing the regulatory aspects and the analysis and documentation of the data, respectively.

Naidu, J.R.; Royce, B.A.; Miltenberger, R.P.

1992-09-01T23:59:59.000Z

203

Brookhaven National Laboratory site environmental report for calendar year 1991  

Science Conference Proceedings (OSTI)

This publication presents the results of BNL's environmental monitoring and compliance effort and provides an assessment of the impact of Brookhaven National Laboratory (BNL) operations on the environment. This document is the responsibility of the Environmental Protection Section of the Safety and Envirorunental Protection Division. Within this Section, the Environmental Monitoring Group (EMG) sample the environment, interpreted the results, performed the impact analysis of the emissions from BNL, and compiled the information presented here. In this effort, other groups of the Section: Compliance; Analytical; Ground Water; and Quality played a key role in addressing the regulatory aspects and the analysis and documentation of the data, respectively.

Naidu, J.R.; Royce, B.A.; Miltenberger, R.P.

1992-09-01T23:59:59.000Z

204

Annual site environmental report for calendar year 1999  

Science Conference Proceedings (OSTI)

Many State and Federal environmental protection laws and regulations apply to Western. Western facilities are within the jurisdiction of six Environmental Protection Agency (EPA) regions and 17 states. Western's environmental policy statement directs employees to prevent, control, and abate environmental pollution at their facilities, and when possible, enhance the environment. To help assure conformance with all regulatory requirements, and to achieve its pollution prevention goals and objectives, Western is developing an Environmental Management System (EMS). One of the major regulatory impacts on Western continues to be the Toxic Substances Control Act (TSCA) that regulates the use of polychlorinated biphenyls (PCB). Western's policy is to eliminate PCBs from its system wherever economically and operationally possible. This will lessen the impact of PCB regulations on operations and the impact of PCBs on the environment. Executive Order 12856 requires Federal Agencies to comply with the Emergency Planning and Community Right-to-Know Act (EPCRA). As with other DOE elements, Western has been complying with EPCRA since before the Executive Order was issued. To summarize, in 1999, Western's Regional offices implemented programs to notify State and local emergency response entities in accordance with Section 311 and 312 of EPCRA. Chemical inventories indicate that Western does not manufacture, process, or otherwise use reportable quantities of EPCRA Section 313 chemicals so Toxic Release reports were not required.

NONE

2000-04-14T23:59:59.000Z

205

Analysis of 2011 Meteorological Data from the Knolls Atomic Power Laboratory and Kesselring Site Operations Facilities  

SciTech Connect

Both the Knolls Atomic Power Laboratory (KAPL) in Schenectady, NY and the Kesselring Site Operations (KSO) facility near Ballston Spa, NY are required to estimate the effects of hypothetical emissions of radiological material from their respective facilities by the US Environmental Protection Agency (EPA), which regulates these facilities. An atmospheric dispersion model known as CAP88, which was developed and approved by the EPA for such purposes, is used by KAPL and KSO to meet this requirement. CAP88 calculations over a given time period are based on statistical data on the meteorological conditions for that period. Both KAPL and KSO have on-site meteorological towers which take atmospheric measurements at a frequency ideal for EPA regulatory model input. However, an independent analysis and processing of the meteorological data from each tower is required to derive a data set appropriate for use in the CAP88 model. The National Atmospheric Release Advisory Center (NARAC) was contracted by KAPL to process the on-site data for the calendar year 2011. The purpose of this document is to: (1) summarize the procedures used in the preparation/analysis of the 2011 meteorological data; and (2) document adherence of these procedures to the guidance set forth in 'Meteorological Monitoring Guidance for Regulatory Modeling Applications', EPA document - EPA-454/R-99-005 (EPA-454). This document outlines the steps in analyzing and processing meteorological data from the Knolls Atomic Power Laboratory and Kesselring Site Operations facilities into a format that is compatible with the steady state dispersion model CAP88. This process is based on guidance from the EPA regarding the preparation of meteorological data for use in regulatory dispersion models. The analysis steps outlined in this document can be easily adapted to process data sets covering time period other than one year. The procedures will need to be modified should the guidance in EPA-454 be updated or revised.

Aluzzi, F J

2012-02-27T23:59:59.000Z

206

Annual Transportation Report for Radioactive Waste Shipments to and from the Nevada Test Site, Fiscal Year 2006  

SciTech Connect

In February 1997, the U.S. Department of Energy, Nevada Operations Office issued the Mitigation Action Plan which addressed potential impacts described in the Final Environmental Impact Statement for the Nevada Test Site and Off-Site Locations in the State of Nevada (DOE/EIS 0243). The U.S. Department of Energy, Nevada Operations Office committed to several actions, including the preparation of an annual report, which summarizes waste shipments to and from the Nevada Test Site (NTS) Radioactive Waste Management Sites (RWMS) at Area 3 and Area 5. This document satisfies requirements with regard to low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) transported to or from the NTS during fiscal year (FY) 2006.

DOE /NNSA NSO

2007-01-01T23:59:59.000Z

207

Electric and Hybrid Vehicle Program Site Operator Program Quarterly...  

NLE Websites -- All DOE Office Websites (Extended Search)

the cost of operating the EVcort on electricity equates to 0.87 per gallon of gasoline. The vehicle was transported to the Chicago Soleq facility (1,500 cost to KSU) for...

208

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 2000  

Science Conference Proceedings (OSTI)

The results of the 2000 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and nonradioactive pollutants (if any) that are added to the environment as a result of PPPL's operations. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2000. The Princeton Plasma Physics Laboratory has engaged in fusion energy research since 1951. The long-range goal of the U.S. Magnetic Fusion Energy Research Program is to create innovations to make fusion power a practical reality -- an alternative energy source. The year 2000 marked the second year of National Spherical Torus Experiment (NSTX) operations and Tokamak Fusion Test Reactor (TFTR) dismantlement and deconstruction activities. A collaboration among fourteen national laboratories, universities, and research institutions, the NSTX is a major element in the U.S. Fusion Energy Sciences Program. It has been designed to test the physics principles of spherical torus (ST) plasmas. The ST concept could play an important role in the development of smaller, more economical fusion power plants. With its completion within budget and ahead of its target schedule, NSTX first plasma occurred on February 12, 1999. In 2000, PPPL's radiological environmental monitoring program measured tritium in the air at on-site and off-site sampling stations. PPPL is capable of detecting small changes in the ambient levels of tritium by using highly sensitive monitors. The operation of an in-stack monitor located on D-site is a requirement of the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations with limits set by the Environmental Protection Agency (EPA). Also included in PPPL's radiological environmental monitoring program, are precipitation, surface, ground, a nd waste water monitoring. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of nonradiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an area adjacent to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the D-site stack; the data are presented in this report.

Virginia L. Finley

2002-04-22T23:59:59.000Z

209

Portsmouth Site Plant Surpasses Five Years Without Lost-Time Accident |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plant Surpasses Five Years Without Lost-Time Plant Surpasses Five Years Without Lost-Time Accident Portsmouth Site Plant Surpasses Five Years Without Lost-Time Accident November 26, 2013 - 12:00pm Addthis BWCS employees from all departments of the DUF6 project at the Portsmouth site come together to mark five years without a lost-time accident. BWCS employees from all departments of the DUF6 project at the Portsmouth site come together to mark five years without a lost-time accident. Russ Hall, environment, safety and health supervisor, changes the DUF6 project sign to mark five years without a lost-time accident. Russ Hall, environment, safety and health supervisor, changes the DUF6 project sign to mark five years without a lost-time accident. BWCS employees from all departments of the DUF6 project at the Portsmouth site come together to mark five years without a lost-time accident.

210

The Idaho National Engineering Laboratory Site environmental report for calendar year 1992  

Science Conference Proceedings (OSTI)

The results of the various monitoring programs for 1992 indicate that most radioactivity from the INEL operations could not be distinguished from worldwide fallout and natural radioactivity in the region surrounding the INEL Site. Although some radioactive materials were discharged during Site operations, concentrations and doses to the surrounding population were of no health consequence and were far less than State of Idaho and Federal health protection guidelines. The first section of the report summarizes INEL activities related to compliance with environmental regulations and laws for Calendar Year 1992 and January 1 through April 1, 1993. The major portion of the report summarizes results of the RESL environmental surveillance program, which includes the collection of foodstuffs at the INEL boundary and distant offsite locations, and the collection of air and water samples at onsite locations, offsite boundary, and distant locations. The report also compares and evaluates the sample results to appropriate Federal regulations and standards and discusses implications, if any. The USGS ground-water monitoring program is briefly summarized, and data from USGS reports are included in maps showing the spread of contaminants. Effluent monitoring and nonradiological drinking water monitoring performed by INEL contractors are discussed briefly, and data are summarized in tables.

Hoff, D.L.; Mitchell, R.G.; Moore, R.; Bingham, L.

1993-06-01T23:59:59.000Z

211

Shaft Siting and Configuration for Flexible Operating Mode  

SciTech Connect

The purpose of this document as stated in the ''Technical Work Plan for Subsurface Design Section FY 01 Work Activities'' (CRWMS M&O 2001a, pg. 14) is to review and evaluate the most current concepts for shaft siting and configuration. The locations of the shaft sites will be evaluated in reference to the overall subsurface ventilation layout shown in Figure 1. The scope will include discussions on pad size requirements, shaft construction components such as collars, shaft stations, sumps, ground support and linings, head frames, fan ducting and facility equipping. In addition to these, shaft excavation methodologies and integration with the overall subsurface construction schedule will be described. The Technical Work Plan (TWP), (CRWMS M&O 2001a), for this document has been prepared in accordance with AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering and Regulatory Compliance Activities''. This document will be prepared in accordance with AP-3.10Q, ''Analysis and Models''. This document contributes to Site Recommendation (SR). The intended use of this document is to provide an analysis for shaft siting and configuration criteria for subsequent construction. This document identifies preliminary design concepts that should not be used for procurement, fabrication, or construction.

Robert Boutin

2001-08-02T23:59:59.000Z

212

Department of Energy Site Operator Program. Final report, October 1, 1991--September 31, 1996  

DOE Green Energy (OSTI)

York Technical College is a two-year public institution accredited by the Commission of Colleges of the Southern Association of Colleges and Schools. York Technical College has been involved with electric vehicles since the late 1980`s. The four major objectives of the Site Operator Program were (1) field test and evaluate electric and hybrid vehicles and related components; (2) define and develop a national infrastructure system including electric charging systems, service/training education programs, utility system impacts and safety standards; (3) increase public awareness regarding environmental benefits, reduced dependency on foreign oil, technology development, and economic impacts; (4) assist local, state and federal agencies and fleet operators in developing electric and hybrid vehicle programs. The primary thrusts of the electric vehicle program at York Technical College, supporting the objectives of the Site Operator program were: (1) public awareness, (2) public education, (3) EV maintenance curriculum development and maintenance training, (4) field data collection, (5) vehicle modification and upgrade, (6) establish electric vehicle partnerships.

NONE

1996-12-31T23:59:59.000Z

213

Pantex Plant site environmental report for calendar year 1989  

SciTech Connect

This report summarizes the environmental monitoring program at Pantex Plant for 1989. It has been prepared in accordance with the United States Department of Energy Order 5400.1. This report presents monitoring data for both radioactive and nonradioactive species in the local environment. Plant activities involve the handling of significant quantities of uranium, plutonium, and tritium in the form of completed parts received from other DOE facilities, resulting in a very low potential for release of these radionuclides to the atmosphere. In May 1989, there was an accidental release of 40,000 curies (Ci) of tritium (conservatively estimated). The normal releases during the year were 0.12 Ci of tritium and 21 {mu}Ci of uranium-238. The USEPA issued a draft Administrative Order of Consent under section 3008(h) in 1988. Negotiations between DOE and EPA are still continuing. Chromium at a level above drinking water standards was found in a perched groundwater well in zone 12. Also, trace amounts of solvents and high explosives were found in the perched groundwater in zone 12. 12 refs., 10 figs., 53 tabs.

Not Available

1990-05-01T23:59:59.000Z

214

EA-1332: Leasing Land for the Siting, Construction and Operation of a  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32: Leasing Land for the Siting, Construction and Operation of 32: Leasing Land for the Siting, Construction and Operation of a Commercial AM Radio Antenna at Los Alamos National Laboratory, Los Alamos, New Mexico EA-1332: Leasing Land for the Siting, Construction and Operation of a Commercial AM Radio Antenna at Los Alamos National Laboratory, Los Alamos, New Mexico SUMMARY This EA evaluates the environmental impacts for the proposal to lease approximately 3 acres of land at the U.S. Department of Energy's Los Alamos National Laboratory on the southeast tip of Technical Area 54 for the siting, construction and operation of an AM radio broadcasting antenna. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD February 16, 2000 EA-1332: Finding of No Significant Impact Leasing Land for the Siting, Construction and Operation of a Commercial AM

215

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 2001  

Science Conference Proceedings (OSTI)

The purpose of this report is to provide the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and nonradioactive pollutants (if any) that are added to the environment as a result of the Princeton Plasma Physics Laboratory's (PPPL) operations. The results of the 2001 environmental surveillance and monitoring program for PPPL are presented and discussed. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2001. PPPL has engaged in fusion energy research since 1951. The vision of the Laboratory is to create innovations to make fusion power a practical reality--a clean, alternative energy source. The Year 2001 marked the third year of National Spherical Torus Experiment (NSTX) operations and Tokamak Fusion Test Reactor (TFTR) dismantlement and deconstruction activities. A collaboration among fourteen national laboratories, universities, and research institutions, the NSTX is a major element in the U.S. Fusion Energy Sciences Program. It has been designed to test the physics principles of spherical torus (ST) plasmas. The ST concept could play an important role in the development of smaller, more economical fusion reactors. In 2001, PPPL's radiological environmental monitoring program measured tritium in the air at on- and off-site sampling stations. PPPL is capable of detecting small changes in the ambient levels of tritium by using highly sensitive monitors. The operation of an in-stack monitor located on D-site is a requirement of the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations; also included in PPPL's radiological environmental monitoring program, are water monitoring--precipitation, ground-, surface-, and waste-waters. PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the D-site stack; the data are presented in this report. Groundwater monitoring continue d under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of nonradiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the low levels of volatile organic compounds in an area adjacent to PPPL. In 2001, PPPL was in compliance with its permit limits for surface and sanitary discharges and had no reportable releases. Additionally, as part of DOE's program for the purchase of recycled content and other environmentally preferred products, PPPL has ranked in the excellent category of 80 to 90% of the goal.

Virginia L. Finley

2004-04-07T23:59:59.000Z

216

Guide for Operating an Interim On-Site Low Level Radioactive Waste Storage Facility  

Science Conference Proceedings (OSTI)

As a result of increasing low-level waste (LLW) disposal site uncertainty, the industry expects that utilities will have to rely on their own on-site storage LLW storage programs in the near future. This report captures essential information related to the operation of an on-site LLW storage program. The report is a comprehensive reference to which utilities can routinely refer throughout the development and implementation of the storage program and operation of the storage facility.

2004-11-16T23:59:59.000Z

217

Results from the first year of operation of the Federal Methanol Fleet at Argonne National Laboratory  

DOE Green Energy (OSTI)

The Oak Ridge National Laboratory, under the auspices of the Department of Energy's Alternative Fuels Utilization Program, has managed the Federal Methanol Fleet Project since its inception in fiscal year 1985. This congressionally-mandated project directed the Department of Energy to introduce methanol-fueled vehicles into civilian government fleet operations. This interim report describes the first year of operation of a methanol fleet at Argonne National Laboratory in Argonne, Illinois. The fleet consists of five methanol-fueled 1986 Chevrolet S-10 pickup trucks along with five Chevrolet S-10s for comparison, as well as five methanol-fueled 1986 Ford Crown Victorias paired with four gasoline Fords. Data have been collected and tabulated on fuel consumption, maintenance records, oil sample analyses, and driver perceptions of vehicle operability. Energy efficiency for the methanol vehicles was slightly greater than that for the counterpart gasoline vehicles. Maintenance records reveal that the methanol vehicles required substantially more service than the gasoline vehicles, but a large proportion of the difference was due to methanol component replacements where improvements or upgrades were scheduled to be implemented after the vehicles were in service. Oil sample analyses revealed that engine wear rates were higher in the methanol vehicles. Drivers indicated that the methanol vehicles are quite acceptable, but they rated the gasoline vehicles higher. The Argonne fleet serves as the cold-weather site of the Federal Methanol Fleet and, as such, the methanol vehicles have been outfitted with special systems to aid in cold-starting and driveability.

McGill, R.N.; Hillis, S.L.; Larsen, R.P.

1988-10-01T23:59:59.000Z

218

Oversight Scheduling and Operational Awareness at the Savannah River Site, March 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HSS Independent Activity Report - HSS Independent Activity Report - Rev. 0 Report Number: HIAR-SRS-2013-03-25 Site: Savannah River Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report on Oversight Scheduling and Operational Awareness at the Savannah River Site Dates of Activity : 03/25/2013 - 03/28/2013 Report Preparer: Phillip D. Aiken Activity Description/Purpose: 1. The Independent Oversight Site Lead for the Savannah River Site traveled to the site to work with functional area managers to schedule nuclear safety oversight activities. 2. The Site Lead reviewed the differing professional opinion (DPO) program at the Savannah River Operations Office (Department of Energy (DOE)-SR). Result: 1. The Site Lead scheduled a radiological program review at the National Nuclear Security Administration Savannah River

219

Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site, IG-0377  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IG-1 IG-1 INFORMATION: Report on "Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site" The Secretary BACKGROUND: During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department's annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth

220

Operational Awareness Oversight of the Nevada National Security Site, August 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HIAR NNSS-2012-08-16 HIAR NNSS-2012-08-16 Site: Nevada National Security Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Operational Awareness Oversight of the Nevada National Security Site Dates of Activity : 08/13/2012 - 08/16/2012 Report Preparer: William Macon Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) activity was to perform an operational awareness site visit to observe Subcritical Experiment (SCE) activities at the U1a Complex, discuss ongoing activities at the Device Assembly Facility (DAF) and the National Criticality Experiment Research Center (NCERC), and monitor the status of other ongoing site activities at the Nevada National Security Site (NNSS) operated by National Security Technologies, LLC (NSTec).

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Overview of Fiscal Year 2002 Research and Development for Savannah River Site's Salt Waste Processing Facility  

SciTech Connect

The Department of Energy's (DOE) Savannah River Site (SRS) high-level waste program is responsible for storage, treatment, and immobilization of high-level waste for disposal. The Salt Processing Program (SPP) is the salt (soluble) waste treatment portion of the SRS high-level waste effort. The overall SPP encompasses the selection, design, construction and operation of treatment technologies to prepare the salt waste feed material for the site's grout facility (Saltstone) and vitrification facility (Defense Waste Processing Facility). Major constituents that must be removed from the salt waste and sent as feed to Defense Waste Processing Facility include actinides, strontium, cesium, and entrained sludge. In fiscal year 2002 (FY02), research and development (R&D) on the actinide and strontium removal and Caustic-Side Solvent Extraction (CSSX) processes transitioned from technology development for baseline process selection to providing input for conceptual design of the Salt Waste Processing Facility. The SPP R&D focused on advancing the technical maturity, risk reduction, engineering development, and design support for DOE's engineering, procurement, and construction (EPC) contractors for the Salt Waste Processing Facility. Thus, R&D in FY02 addressed the areas of actual waste performance, process chemistry, engineering tests of equipment, and chemical and physical properties relevant to safety. All of the testing, studies, and reports were summarized and provided to the DOE to support the Salt Waste Processing Facility, which began conceptual design in September 2002.

H. D. Harmon, R. Leugemors, PNNL; S. Fink, M. Thompson, D. Walker, WSRC; P. Suggs, W. D. Clark, Jr

2003-02-26T23:59:59.000Z

222

Review Paper/ Crude Oil at the Bemidji Site: 25 Years of  

E-Print Network (OSTI)

Review Paper/ Crude Oil at the Bemidji Site: 25 Years of Monitoring, Modeling, and Understanding of hydrocarbon contamination. A considerable volume of oil remains in the subsurface today despite 30 years of natural attenuation and 5 years of pump-and-skim remediation. Studies at Bemidji were among the first

223

Summary of the Hanford Site Environmental Report for Calendar Year 2008  

SciTech Connect

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2008." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2009 information is included where appropriate.

Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

2009-09-15T23:59:59.000Z

224

Summary of the Hanford Site Environmental Report for Calendar Year 2009  

Science Conference Proceedings (OSTI)

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2009." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2010 information is included where appropriate.

Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

2010-09-30T23:59:59.000Z

225

Summary of the Hanford Site Environmental Report for Calendar Year 2007  

SciTech Connect

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2007." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights signifi cant environmental and public protection programs and efforts. Some historical and early 2008 information is included where appropriate.

Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

2008-09-10T23:59:59.000Z

226

[Electric and hybrid vehicle site operators program]: Thinking of the future  

SciTech Connect

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy's Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid vans and two (2) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1993 Ford EVcort station wagons. The G-Van has been signed in order for the public to be aware that this is an electric drive vehicle. Financial participants' names have been stenciled on the back door of the van. This vehicle is available for short term loan to interested utilities and companies. When other vehicles are obtained, the G-Van will be maintained on K-State's campus.

1993-01-01T23:59:59.000Z

227

[Electric and hybrid vehicle site operators program]: Thinking of the future  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy's Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid vans and two (2) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1993 Ford EVcort station wagons. The G-Van has been signed in order for the public to be aware that this is an electric drive vehicle. Financial participants' names have been stenciled on the back door of the van. This vehicle is available for short term loan to interested utilities and companies. When other vehicles are obtained, the G-Van will be maintained on K-State's campus.

Not Available

1993-01-01T23:59:59.000Z

228

Toy to the World: Savannah River Site Celebrates 21 Years of Bringing Joy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Toy to the World: Savannah River Site Celebrates 21 Years of Toy to the World: Savannah River Site Celebrates 21 Years of Bringing Joy to Kids Toy to the World: Savannah River Site Celebrates 21 Years of Bringing Joy to Kids December 11, 2012 - 12:00pm Addthis An elf from DOE's Savannah River Site poses with Santa Claus, who holds a bike, one of the more than 14,200 toys federal employees and contractors donated to the U.S. Marine Toys for Tots Program. Mounds of bikes and other donated toys for the program can be seen in the background. An elf from DOE's Savannah River Site poses with Santa Claus, who holds a bike, one of the more than 14,200 toys federal employees and contractors donated to the U.S. Marine Toys for Tots Program. Mounds of bikes and other donated toys for the program can be seen in the background.

229

APS Long-Range Operations Schedule (Fiscal Year 2014)  

NLE Websites -- All DOE Office Websites (Extended Search)

Schedule (Fiscal Year 2014) Schedule (Fiscal Year 2014) Run 2013-3 Run 2014-1 Run 2014-2 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 2 2 2 2 1 1 1 2 2 2 2 1 1 1 2 2 3 3 1 1 1 3 3 3 3 1 1 1 3 3 3 3 1 1 1 3 3 4 4 1 1 1 4 4 4 4 4 4 1 4 4 4 4 1 4 4 5 5 1 5 4 4 4 5 5 5 1 1 5 5 5 5 5 5 6 6 1 1 6 4 4 4 6 6 6 1 1 1 6 6 6 6 6 6 7 7 1 1 1 7 4 4 4 7 7 7 1 1 1 7 7 7 7 7 7 8 8 1 1 1 8 4 4 4 8 8 8 1 1 1 8 8 8 8 1 1 8 8 9 9 1 1 1 9 4 4 4 9 9 9 1 1 1 9 9 9 9 1 1 1 9 9 10 10 1 1 1 10 4 10 10 10 1 1 1 10 10 10 10 1 1 1 10 10 11 11 1 11 4 4 11 11 11 1 11 11 11 11 1 1 1 11 11 12 12 12 4 4 4 12 12 12 4 4 12 12 12 12 1 1 1 12 12 13 13 13 4 4 4 13 13 13 4 4 4 13 13 13 13 1 1

230

The National Energy Technology Laboratory Annual Site Environmental Report for Calendar Year 2001  

Science Conference Proceedings (OSTI)

No significant environmental problems were identified at the National Energy Technology Laboratory (NETL) sites in Morgantown (MGN), Pittsburgh (PGH), Tulsa (NPTO) and Fairbanks (AEO) during 2001. No radionuclides were released from the sites during 2001. The sites maintain two major environmental programs: waste management, and environmental media and release management. These two programs encompass waste handling, storage, and disposal, waste minimization and pollution prevention, air quality emissions, surface-water discharges, groundwater impacts, industrial wastewater discharges, and spill control procedures. The Morgantown and Pittsburgh sites currently maintain complete monitoring programs for groundwater, stormwater discharge, laboratory wastewater discharge, and meteorological data. In addition, an annual air emissions inventory is prepared. A comprehensive Directives Program aimed at managing environmental, safety, health requirements, and risks was initiated in 1997, continued through subsequent years, and will be completed in 2003. The primary objective of the program is to identify and implement standards that will protect the health and safety of workers, public, and the environment. This program started with a careful and thorough analysis of risks confronting workers and the communities surrounding NETL sites. Following this analysis, requirements and best management practices were evaluated to determine how requirements could best be used to advance the mission of NETL. Teams of subject-matter experts analyzed the work assigned to determine potential hazards and identify ways to remove or control those hazards. In 2001, NETL developed or revised a series of directives in two major areas: safety analysis and review (SAR) processes, and integrated safety management (ISM) directives. SAR directives were issued for research and development (R&D) operations, support operations, and facilities. ISM directives were released on management processes, such as standards maintenance, performance measures, assessments, corrective actions, lessons-learned, and training. In conjunction with the Directives Program, the use of the voluntary environmental management system, ISO 14001, was evaluated. This includes the only international environmental management standard to which an entity can be certified. NETL is using the specifications and guidance from this standard to identify an effective environmental management system for the NETL sites. An outside consultant performed an environmental management system assessment (also referred to as an initial environmental review), as referenced in ISO 14004. The objective of the assessment was to determine the degree to which NETL's existing integrated safety management system (ISMS), safety analysis review system (SARS), and environmental management programs conformed with the ISO14001 Environmental Management System (EMS) standard and the United States Environmental Protection Agency's (EPA) Code of Environmental Management Principles. A performance measurement system continued to be maintained during 2001 to assist in evaluating how effectively activities at NETL meet mission-critical goals and how well missions and strategies are connected in the DOE strategic plan. This system also provides data to assist in gauging performance against the DOE critical success factors, that is, performance against technical objectives. Various environmental milestones can be tracked to completion, thus giving NETL measures by which to gauge the sites' goals of remaining in regulatory compliance and achieving best-in-class environmental performance.

National Energy Technology Laboratory

2002-10-01T23:59:59.000Z

231

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

232

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

2005-09-30T23:59:59.000Z

233

Office of Secure Transportation Twenty-Five Year Site Plan (TYSP...  

National Nuclear Security Administration (NNSA)

by the United States Department of Energy (DOE) O 430.1B Real Property Asset Management (RPAM) in conformance with the Twenty-Five Year Site Plan (TYSP) 2012. Budget data...

234

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

235

Environmental analysis of the operation of Oak Ridge National Laboratory (X-10 site)  

Science Conference Proceedings (OSTI)

An environmental analysis of the operation of the Oak Ridge National Laboratory (ORNL) facilities in Bethel Valley and Melton Valley was conducted to present to the public information concerning the extent to which recognizable effects, or potential effects, on the environment may occur. The analysis addresses current operations of the ORNL X-10 site and completed operations that may continue to have residual effects. Solid wastes from ORNL operations at the Y-12 site which are transported to the X-10 site for burial (e.g., Biology Division animal wastes) are included as part of X-10 site operation. Socioeconomic effects are associated primarily with the communities where employees live and with the Knoxville Bureau of Economic Analysis economic area as a whole. Therefore, ORNL employees at both Y-12 and X-10 sites are included in the ORNL socioeconomic impact analysis. An extensive base of environmental data was accumulated for this report. Over 80 reports related to ORNL facilities and/or operations are cited as well as many open-literature citations. Environmental effects of the operation of ORNL result from operational discharges from the onsite facilities; construction and/or modification of facilities, transportation to and from the site of persons, goods and services; socioeconomic impacts to the local, regional, and general population; and accidental discharges if they should occur. Operational discharges to the environnment are constrained by federal, state, and local regulations and by criteria established by the US Department of Energy to minimize adverse impacts. It is the purpose of this document to evaluate the operation of the ORNL insofar as impacts beyond the site boundary may occur or have the potential for occurrence.

Boyle, J.W.; Blumberg, R.; Cotter, S.J.

1982-11-01T23:59:59.000Z

236

The Savannah River Site's liquid radioactive waste operations involves the man  

NLE Websites -- All DOE Office Websites (Extended Search)

Site's liquid radioactive waste operations involves the management of space in the Site's Site's liquid radioactive waste operations involves the management of space in the Site's 49 underground waste tanks, including the removal of waste materials. Once water is removed from the waste tanks, two materials remain: salt and sludge waste. Removing salt waste, which fills approximately 90 percent of the tank space in the SRS tank farms, is a major step toward closing the Site's waste tanks that currently contain approximately 38 million gallons of waste. Due to the limited amount of tank space available in new-style tanks, some salt waste must be dispositioned in the interim to ensure sufficient tank space for continued sludge washing and to support the initial start-up and salt processing operations at the Salt Waste Processing Facility (SWPF).

237

Pacific Northwest National Laboratory Site Environmental Report for Calendar Year 2011  

Science Conference Proceedings (OSTI)

The PNNL Site Environmental Report for Calendar Year 2011 was prepared pursuant to the requirements of Department of Energy (DOE) Order 231.1B, "Environment, Safety and Health Reporting" to provide a synopsis of calendar year 2011 information related to environmental management performance and compliance efforts. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and orders and environmental management performance.

Duncan, Joanne P.; Fritz, Brad G.; Tilden, Harold T.; Stoetzel, Gregory A.; Stegen, Amanda; Barnett, J. M.; Su-Coker, Jennifer; Moon, Thomas W.; Ballinger, Marcel Y.; Dirkes, Roger L.; Opitz, Brian E.

2012-09-01T23:59:59.000Z

238

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2012  

Science Conference Proceedings (OSTI)

The PNNL Annual Site Environmental Report for Calendar Year 2012 was prepared pursuant to the requirements of Department of Energy (DOE) Order 231.1B, "Environment, Safety and Health Reporting" to provide a synopsis of calendar year 2012 information related to environmental management performance and compliance efforts. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and orders and environmental management performance.

Duncan, Joanne P.; Ballinger, Marcel Y.; Fritz, Brad G.; Tilden, Harold T.; Stoetzel, Gregory A.; Barnett, J. M.; Su-Coker, Jennifer; Stegen, Amanda; Moon, Thomas W.; Becker, James M.; Raney, Elizabeth A.; Chamness, Michele A.; Mendez, Keith M.

2013-09-01T23:59:59.000Z

239

EIS-0466: Site-wide Environmental Impact Statement for Ongoing Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Site-wide Environmental Impact Statement for Ongoing 6: Site-wide Environmental Impact Statement for Ongoing Operations at Sandia National Laboratories, Albuquerque, New Mexico EIS-0466: Site-wide Environmental Impact Statement for Ongoing Operations at Sandia National Laboratories, Albuquerque, New Mexico Summary This Site-Wide EIS evaluates the continued operation of the DOE/NNSA activities at Sandia National Laboratories. The SWEIS will consider a No Action Alternative, which is to continue current operations through implementation of the 1999 Record of Decision and subsequent NEPA decisions, and three action alternatives proposed for consideration. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download August 12, 2011 EIS-0466: Re-opening of Public Scoping Period and Announcement of

240

Electric and Hybrid Vehicle Program: Site Operator Program. Quarterly progress report, April--June 1995  

DOE Green Energy (OSTI)

This quarterly report details activities of the Department of Energy (DOE) Site Operator Program for the months of April, May, and June 1995. The 12 program participants, their geographic locations, and the principal thrusts of their efforts are provided.

Kiser, D.M.; Brown, H.L.

1995-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2009  

SciTech Connect

This report summarizes the annual inspection, sampling, and maintenance activities performed on and near the Salmon, Mississippi, Site in calendar year 2009. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report complies with the annual report requirement. The Salmon, MS, Site is located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS The site encompasses 1,470 acres and is not open to the general public. The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned responsibility for the site effective October 1, 2006

None

2010-10-01T23:59:59.000Z

242

Princeton Plasma Physics Laboratory (PPPL) annual site environmental report for calendar year 1993  

Science Conference Proceedings (OSTI)

This report gives the results of the environmental activities and monitoring programs at the Princeton Plasma Physics Laboratory (PPPL) for CY93. The report is prepared to provide the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants, if any, added to the environment as a result of PPPL operations, as well as environmental initiatives, assessments, and programs that were undertaken in 1993. The objective of the Annual Site Environmental Report is to document evidence that DOE facility environmental protection programs adequately protect the environment and the public health. The Princeton Plasma Physics Laboratory has engaged in fusion energy research since 1951. The long-range goal of the U.S. Magnetic Fusion Energy Research Program is to develop and demonstrate the practical application of fusion power as an alternate energy source. In 1993, PPPL had both of its two large tokamak devices in operation; the Tokamak Fusion Test Reactor (TFTR) and the Princeton Beta Experiment-Modification (PBX-M). PBX-M completed its modifications and upgrades and resumed operation in November 1991. TFTR began the deuterium-tritium (D-T) experiments in December 1993 and set new records by producing over six million watts of energy. The engineering design phase of the Tokamak Physics Experiment (TPX), which replaced the cancelled Burning Plasma Experiment in 1992 as PPPL`s next machine, began in 1993 with the planned start up set for the year 2001. In 1993, the Environmental Assessment (EA) for the TFRR Shutdown and Removal (S&R) and TPX was prepared for submittal to the regulatory agencies.

Finley, V.L.; Wiezcorek, M.A.

1995-01-01T23:59:59.000Z

243

Geographic and Operational Site Parameters List (GOSPL) for the 2004 Composite Analysis  

SciTech Connect

This report briefly describes each of the key data fields, including the source(s) of data, and provides the resulting inputs to be used for the 2004 Composite Analysis. A master spreadsheet termed the Geographic and Operational Site Parameters List (GOSPL) was assembled to facilitate the generation of keyword input files containing general information on each waste site, its operational/disposal history, and its environmental settings (past, current, and future).

Last, George V.; Nichols, William E.; Kincaid, Charles T.

2004-07-01T23:59:59.000Z

244

Guidelines for Operating an Interim On Site Low Level Radioactive Waste Storage Facility - Revision 1  

Science Conference Proceedings (OSTI)

The majority of commercial USA nuclear stations have constructed on-site LLW storage facilities, and most of these same utilities are experiencing or have experienced at least one period of interim on-site storage. These Guidelines focus on operational considerations and incorporate many of the lessons learned while operating various types of LLW storage facilities. This document was reviewed by the USNRC. Subsequently, the USNRC issued RIS 2008-32, Interim LLRW Storage at NPPs, which recognizes the meth...

2009-02-23T23:59:59.000Z

245

EIS-0380: Site-Wide Environmental Impact Statement for Continued Operation of the Los Alamos National Laboratory, New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

This Site-Wide EIS evaluates the continued operation of the Los Alamos National Laboratory (LANL). NNSA identified and assessed three alternatives for continued operation of LANL: (1) No Action, (2) Reduced Operations, and (3) Expanded Operations.

246

11 Navy sites to save $871,000 yearly | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Navy sites to save $871,000 yearly 1 Navy sites to save $871,000 yearly 11 Navy sites to save $871,000 yearly July 13, 2010 - 6:12pm Addthis Joshua DeLung What does this project do? The solar energy systems are expected to generate 9,399 MWh of clean, renewable energy during first full year after construction. The solar and roofing upgrades that will save the Navy $871,935 annually. The process will involve hundreds workers across the projects. 32 buildings in Florida, Mississippi and Texas to receive energy upgrades Up to 275 subcontractors to work on roofing and solar projects 9,399 MWh of energy expected to be generated in first full year after construction The U.S. Navy's Naval Facilities Engineering Command (NAVFAC) Southeast - based in Jacksonville, Fla. - is using $69.3 million in funding from the

247

Site data acquisition subsystem (SDAS) Mod 1, installation, operation, and maintenance manual  

DOE Green Energy (OSTI)

The Site Data Acquisition Subsystem (SDAS) Mod 1 is designed to collect sensor measurement data from a solar energy demonstration site. A brief description of the SDAS is given and the installation requirements and procedures, the operations description and the procedures for field maintenance of the subsystem are defined.

Not Available

1977-10-29T23:59:59.000Z

248

Low Level Waste On Site Storage Operating Guidelines -- Supplemental Information Manual  

Science Conference Proceedings (OSTI)

This Supplemental Information Manual captures essential information related to the implementation of an on-site low level waste (LLW) storage program. It summarizes the guidance and experience provided in the Interim On-Site Storage series of reports and should be used in concert with EPRI report 1018644, "Guidelines for Operating an Interim On Site Low Level Radioactive Waste Storage FacilityRevision 1," 2009.

2009-02-26T23:59:59.000Z

249

Lessons learned from an installation perspective for chemical demilitarization plant start-up at four operating incineration sites.  

SciTech Connect

This study presents the lessons learned by chemical storage installations as they prepared for the start of chemical demilitarization plant operations at the four current chemical incinerator sites in Alabama, Arkansas, Oregon, and Utah. The study included interviews with persons associated with the process and collection of available documents prepared at each site. The goal was to provide useful information for the chemical weapons storage sites in Colorado and Kentucky that will be going through plant start-up in the next few years. The study is not a compendium of what to do and what not to do. The information has been categorized into ten lessons learned; each is discussed individually. Documents that may be useful to the Colorado and Kentucky sites are included in the appendices. This study should be used as a basis for planning and training.

Motz, L.; Decision and Information Sciences

2011-02-21T23:59:59.000Z

250

FTCP OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 FTCP OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2010 Operational Plan FY2010 Operational Plan - Goal 1 Summary FY2010 Operational Plan - Goal 2 Summary FY2010 Operational Plan - Goal 3 Summary

251

Electric and Hybrid Vehicle Program; Site Operator Program. Quarterly progress report, October--December 1991  

DOE Green Energy (OSTI)

Activities during the first quarter centered around integrating the new participants into the program. A meeting of the Site Operators, in conjunction with the first meeting of the Electric Vehicle Users Task Force, was held in October. A second meeting of the Task Force was held in December. During these meetings the new contractual requirements were explained to the participants. The Site Operator Data Base was distributed and explained. The Site Operators will begin using the data base in December 1991 and will supply the operating and maintenance data to the INEL on a monthly basis. The Operators requested that they be able to have access to the data of the other Operators and it was agreed that they would be provided this on floppy disk monthly from the INEL. Presentations were made to the DOE sponsored Automotive Technology Development-Contractors Coordination Meeting in October. An overview of the program was given by EG&G. Representatives from Arizona Public Service, Texas A&M University, and York Technical College provided details of their programs and the results and future goals. Work was begun on commercializing the Versatile Data Acquisition System (VDAS). A Scope of Work has been written for a Cooperative Research and Development Agreement (CRADA) to be submitted to the USABC. If implemented, the CRADA will provide funds for the development and commercialization of the VDAS. Participants in the Site Operator Program will test prototypes of the system within their fleets, making the data available to the USABC and other interested organizations. The USABC will provide recommendations on the data to be collected. Major activities by the majority of the Operators were involved with the continued operation and demonstration of existing vehicles. In addition, several of the operators were involved in identifying and locating vehicles to be added to their fleets. A list of the vehicles in each Site Operator fleet is included as Appendix A to this report.

Warren, J.F.

1992-01-01T23:59:59.000Z

252

Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Science Conference Proceedings (OSTI)

This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.

Not Available

1993-05-01T23:59:59.000Z

253

Maywood Interim Storage Site environmental report for calendar year 1992, 100 West Hunter Avenue, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)  

SciTech Connect

This report describes the environmental surveillance program at the Maywood Interim Storage Site (MISS) and provides the results for 1992. Environmental monitoring of MISS began in 1984, when the site was assigned to DOE by Congress through the Energy and Water Development Appropriations Act and was placed under DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. MISS is part of a National Priorities List (NPL) site. The environmental surveillance program at MISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analysis includes metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling the DOE objective of measuring and monitoring effluents from DOE activities and calculating hypothetical doses to members of the general public. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Environmental standards are established to protect public health and the environment. The radiological data for all media sampled support the conclusion that doses to the public are not distinguishable from natural background radiation.

1993-05-01T23:59:59.000Z

254

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

West Valley Environmental Services LLC (WVES) and URS - Washington Division

2008-12-17T23:59:59.000Z

255

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDPs environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

2007-09-27T23:59:59.000Z

256

West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005  

Science Conference Proceedings (OSTI)

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

2006-09-21T23:59:59.000Z

257

Summary of operations and performance of the Murdock site restoration project in 2007.  

SciTech Connect

This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A brief videorecording of the trees in high-wind conditions is on the compact disc (CD) inside the back cover of this document.

LaFreniere, L. M.; Environmental Science Division

2008-06-03T23:59:59.000Z

258

Analysis of potential impacts of Flaming Gorge Dam hydropower operations on archaeological sites  

DOE Green Energy (OSTI)

An archaeological field study was conducted along the Green River in the areas of Little Hole and Browns Park in Utah and Colorado. The purpose of the study was to measure the potential for hydropower operations at Flaming Gorge Dam to directly or indirectly affect archaeological sites in the study area. Thirty-four known sites were relocated, and six new sites were recorded. Information was collected at each site regarding location, description, geomorphic setting, sedimentary context, vegetation, slope, distance from river, elevation above river level, and site condition. Matching the hydrologic projections of river level and sediment load with the geomorphic and sedimentary context at specific site locations indicated that eight sites were in areas with a high potential for erosion.

Moeller, K.L.; Malinowski, L.M.; Hoffecker, J.F.

1955-12-01T23:59:59.000Z

259

US Department of Energy Nevada Operations Office annual site environmental report, 1992. Volume 1  

SciTech Connect

This report contains the environmental monitoring and assessment results for the Nevada Test Site for 1992. Monitoring and surveillance on and around the NTS by DOE contractors and Site user organizations during 1992 indicated that underground nuclear testing operations were conducted in compliance with regulations, i.e., the dose the maximally exposed offsite individual could have received was less than 0.15 percent of the guideline for air exposure. All 1992 nuclear events took place during the first three quarters of the calendar year prior to the Congressional testing moratorium. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from test operations was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. Using the CAP88-PC model and NTS radionuclide emissions data, the calculated maximum effective dose equivalent offsite would have been 0.012 mrem. Any person receiving this dose was also exposed to 78 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped to EPA-approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Non-NTS support facilities complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

Black, S.C.; Latham, A.R.; Townsend, Y.E. [eds.

1993-09-01T23:59:59.000Z

260

Characterization ReportOperational Closure Covers for the Area 5 Radioactive Waste Management Site at the Nevada Test Site  

SciTech Connect

Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS) for the U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The Area 3 RWMS is located in south-central Yucca Flat and the Area 5 RWMS is located about 15 miles south, in north-central Frenchman Flat. Though located in two separate topographically closed basins, they are similar in climate and hydrogeologic setting. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste, while the Area 3 RWMS uses subsidence craters formed from underground testing of nuclear weapons for the disposal of packaged and unpackaged bulk waste. Over the next several decades, most waste disposal units at both the Area 3 and Area 5 RWMSs are anticipated to be closed. Closure of the Area 3 and Area 5 RWMSs will proceed through three phases: operational closure, final closure, and institutional control. Many waste disposal units at the Area 5RWMS are operationally closed and final closure has been placed on one unit at the Area 3 RWMS (U-3ax/bl). Because of the similarities between the two sites (e.g., type of wastes, environmental factors, operational closure cover designs, etc.), many characterization studies and data collected at the Area 3 RWMS are relevant and applicable to the Area 5 RWMS. For this reason, data and closure strategies from the Area 3 RWMS are referred to as applicable. This document is an interim Characterization Report Operational Closure Covers, for the Area 5 RWMS. The report briefly describes the Area 5 RWMS and the physical environment where it is located, identifies the regulatory requirements, reviews the approach and schedule for closing, summarizes the monitoring programs, summarizes characterization studies and results, and then presents conclusions and recommendations.

Bechtel Nevada Geotechnical Sciences

2005-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1997  

SciTech Connect

The results of the 1997 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are added to the environment as a result of PPPL's operations. During Calendar Year 1997, PPPL's Tokamak Fusion Test Reactor (TFTR) completed fifteen years of fusion experiments begun in 1982. Over the course of three and half years of deuterium-tritium (D-T) plasma experiments, PPPL set a world record of 10.7 million watts of controlled fusion power, more than 700 tritium shots pulsed into the reactor vessel generating more than 5.6 x 1020 neutron and 1.6 gigajoules of fusion energy and researchers studied plasma science experimental data, which included "enhanced reverse shear techniques." As TFTR was completing its historic operations, PPPL participated with the Oak Ridge National Laboratory, Columbia University, and the University of Washington (Seattle) in a collaboration effort to design the National Spherical Torus Experiment (NSTX). This next device, NSTX, is located in the former TFTR Hot Cell on D site, and it is designed to be a smaller and more economical torus fusion reactor. Construction of this device began in late 1997, and first plasma in scheduled for early 1999. For 1997, the U.S. Department of Energy in its Laboratory Appraisal report rated the overall performance of Princeton Plasma Physics Laboratory as "excellent." The report cited the Laboratory's consistently excellent scientific and technological achievements and its successful management practices, which included high marks for environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored the presence of non-radiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an adjacent area to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report.

Finley, V.L. and Levine, J.D.

1999-01-10T23:59:59.000Z

262

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1997  

Science Conference Proceedings (OSTI)

The results of the 1997 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are added to the environment as a result of PPPL's operations. During Calendar Year 1997, PPPL's Tokamak Fusion Test Reactor (TFTR) completed fifteen years of fusion experiments begun in 1982. Over the course of three and half years of deuterium-tritium (D-T) plasma experiments, PPPL set a world record of 10.7 million watts of controlled fusion power, more than 700 tritium shots pulsed into the reactor vessel generating more than 5.6 x 1020 neutron and 1.6 gigajoules of fusion energy and researchers studied plasma science experimental data, which included "enhanced reverse shear techniques." As TFTR was completing its historic operations, PPPL participated with the Oak Ridge National Laboratory, Columbia University, and the University of Washington (Seattle) in a collaboration effort to design the National Spherical Torus Experiment (NSTX). This next device, NSTX, is located in the former TFTR Hot Cell on D site, and it is designed to be a smaller and more economical torus fusion reactor. Construction of this device began in late 1997, and first plasma in scheduled for early 1999. For 1997, the U.S. Department of Energy in its Laboratory Appraisal report rated the overall performance of Princeton Plasma Physics Laboratory as "excellent." The report cited the Laboratory's consistently excellent scientific and technological achievements and its successful management practices, which included high marks for environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored the presence of non-radiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an adjacent area to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report.

Finley, V.L. and Levine, J.D.

1999-01-10T23:59:59.000Z

263

Conduct Operations Assessment Plan - Developed By NNSA/Nevada Site Office Independent Oversight Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 2003 - Conduct of Operations (Programmatic Implementation) August 2003 - Conduct of Operations (Programmatic Implementation) Utilize Conduct of Operations - 5480.19 Utilize BN PD-0021.001 - Formality of Operations Utilize LLNL, LANL comparable documents (WSS) Requirements matrix at the senior management level Flow-down of requirements into facilities VALUE ADDED FOR: AMTS Contractor Assurance Focus Area AMTS ISM Improvements Focus Area AMTS Nuclear Operations Focus Area AMTS Performance Assurance Division AMNS Programs CONDUCT OF OPERATIONS Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The purpose of this assessment is to verify programmatic implementation of DOE O 5480.19, "Conduct of Operations Requirements of DOE Facilities" Criteria: Operations at DOE facilities shall be conducted in a manner to assure an

264

Reimbursements to Licensees of Active Uranium and Thorium Processing Sites, Fiscal Year 2009 and 2010 Status Report  

Energy.gov (U.S. Department of Energy (DOE))

Reimbursements to Licensees of Active Uranium and Thorium Processing Sites, Fiscal Year 2009 and 2010 Status Report (March 2010)

265

Annual Site Environmental Report of the Lawrence Berkeley Laboratory, Calendar year 1992  

SciTech Connect

This Annual Site Environmental Report summarizes LBL environmental activities in calendar year (CY) 1992. The purpose of this Report is to present summary environmental information in order to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. Its format and content are consistent with the requirements of the US Department of Energy (DOE) Order 5400.1, ``General Environmental Protection Program.``

Balgobin, D.A.; Javandel, I.; Pauer, R.O.; Schleimer, G.E.; Thorson, P.A. [eds.

1993-05-01T23:59:59.000Z

266

Nevada Test Site National Emission Standards for Hazardous Air Pollutants Calendar Year 2007  

SciTech Connect

The Nevada Test Site (NTS) is operated by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office. From 1951 through 1992, the NTS was operated as the nation's site for nuclear weapons testing. The release of man-made radionuclides from the NTS as a result of testing activities has been monitored since the first decade of atmospheric testing. After 1962, when nuclear tests were conducted only underground, the radiation exposure to the public surrounding the NTS was greatly reduced. After the 1992 moratorium on nuclear testing, radiation monitoring on the NTS focused on detecting airborne radionuclides which come from historically contaminated soils resuspended into the air (e.g., by winds) and tritium-contaminated soil moisture emitted to the air from soils through evapotranspiration. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) limits the release of radioactivity from a U.S. Department of Energy facility (e.g., the NTS) to 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This is the dose limit established for someone living off of the NTS from radionuclides emitted to air from the NTS. This limit does not include the radiation doses that members of the public may receive through the intake of radioactive particles unrelated to NTS activities, such as those that come from naturally occurring elements in the environment (e.g., naturally occurring radionuclides in soil or radon gas from the earth or natural building materials), or from other man-made sources (e.g., medical treatments). The NTS demonstrates compliance using environmental measurements of radionuclide air concentrations at critical receptor locations. This method was approved by the U.S. Environmental Protection Agency for use on the NTS in 2001 and has been the sole method used since 2005. There are six critical receptor locations on the NTS that are actually pseudocritical receptor locations because they are hypothetical receptor locations; no person actually resides at these onsite locations. Annual average concentrations of detected radionuclides are compared with Concentration Levels (CL) for Environmental Compliance values listed in 40 CFR 61, Appendix E, Table 2. Compliance is demonstrated if the sum of fractions (CL/measured concentrations) of all detected radionuclides at each pseudo-critical receptor location is less than one. In 2007, as in all previous years for which this report has been produced, the NTS has demonstrated that the potential dose to the public from radiological emissions to air from current and past NTS activities is well below the 10 mrem/yr dose limit. Air sampling data collected onsite at each of the six pseudo-critical receptor stations on the NTS had average concentrations of nuclear test-related radioactivity that were a fraction of the limits listed in Table 2 in Appendix E of 40 CFR 61. They ranged from less than 1 percent to a maximum of 20 percent of the allowed NESHAP limit. Because the nearest member of the public resides approximately 20 kilometers (12 miles) from the NTS boundary, concentrations at this location would be only a small fraction of that measured on the NTS.

Robert Grossman; Ronald Warren

2008-06-01T23:59:59.000Z

267

Idaho National Engineering and Environmental Laboratory site environmental report for calendar year 1997  

SciTech Connect

To verify that exposures resulting from operations at Department of Energy (DOE) nuclear facilities remain very small, each site at which nuclear activities are conducted operates an environmental surveillance program to monitor the air, water and any other pathway whereby radionuclides from operations might conceivably reach workers and members of the public. Environmental surveillance and monitoring results are reported annually to the DOE-Headquarters. This report presents a compilation of data collected in 1997 for the routine environmental surveillance programs conducted on and around the Idaho National Engineering and Environmental Laboratory (INEEL). The results of the various monitoring programs for 1997 indicated that radioactivity from the INEEL operations could generally not be distinguished from worldwide fallout and natural radioactivity in the region surrounding the INEEL. Although some radioactive materials were discharged during INEEL operations, concentrations in the offsite environment and doses to the surrounding population were far less than state of Idaho and federal health protection guidelines.

Evans, R.B.; Brooks, R.W.; Roush, D.; Martin, D.B. [Environmental Science and Research Foundation, Idaho Falls, ID (United States); Lantz, B.S. [Dept. of Energy, Idaho Falls, ID (United States). Idaho Operations Office

1998-08-01T23:59:59.000Z

268

Big Spring Wind Power Project First-Year Operating Experience: 1999-2000: U.S. Department of Energy-EPRI Wind Turbine Verification P rogram  

Science Conference Proceedings (OSTI)

The 34-MW Big Spring wind power plant is sited on elevated tabletop mesas near Big Spring, Texas. Under a power purchase agreement between the project owner and operator, York Research Corporation (York), and TXU Electric and Gas (TXU), York will supply wind energy to TXU for 15 years. This report describes Big Spring's first-year operating experience. The lessons learned in the project will be valuable to other utilities and wind power developers planning similar wind power projects, especially those lo...

2000-12-18T23:59:59.000Z

269

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012  

SciTech Connect

This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate2 subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features3), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate

None

2013-03-01T23:59:59.000Z

270

Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, January--March 1996  

DOE Green Energy (OSTI)

Goals of the site operator program include field evaluation of electric vehicles (EVs) in real-world applications and environments, advancement of electric vehicle technologies, development of infrastructure elements necessary to support significant EV use, and increasing the awareness and acceptance of EVs by the public. The site operator program currently consists of 11 participants under contract and two other organizations with data-sharing agreements with the program. The participants (electric utilities, academic institutions, Federal agencies) are geographically dispersed within US and their vehicles see a broad spectrum of service conditions. Current EV inventories of the site operators exceeds 250 vehicles. Several national organizations have joined DOE to further the introduction and awareness of EVs, including: (1) EVAmerica (a utility program) and DOE conduct performance and evaluation tests to support market development for EVs; (2) DOE, DOT, the Electric Transportation Coalition, and the Electric Vehicle Association of the Americas are conducting a series of workshops to encourage urban groups in Clean Cities (a DOE program) to initiate the policies and infrastructure development necessary to support large-scale demonstrations, and ultimately the mass market use, of EVs. Current focus of the program is collection and dissemination of EV operations and performance data to aid in the evaluation of real- world EV use. This report contains several sections with vehicle evaluation as a focus: EV testing results, energy economics of EVs, and site operators activities.

Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles City Dept. of Water and Power, CA (United States)] [and others

1996-08-01T23:59:59.000Z

271

Portsmouth Site Closes a Busy Year with Several D&D Project Completions |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth Site Closes a Busy Year with Several D&D Project Portsmouth Site Closes a Busy Year with Several D&D Project Completions Portsmouth Site Closes a Busy Year with Several D&D Project Completions December 24, 2013 - 12:00pm Addthis Workers have removed more than 25 percent of the process gas equipment from the X-326 facility since starting that work in 2012. This past year they removed 54 of 200 cells. Once the equipment is removed, the 30-acre building will be ready for demolition. Workers have removed more than 25 percent of the process gas equipment from the X-326 facility since starting that work in 2012. This past year they removed 54 of 200 cells. Once the equipment is removed, the 30-acre building will be ready for demolition. Built in 1953, the PORTS X-102 Cafeteria was a 19,000-square-foot building that served as a gathering spot for employees over the years. Age caught up with the building and it was closed in 2012. Demolition of the structure was completed the week of Aug. 19, eight days ahead of schedule.

272

Argonne National Laboratory-East site environmental report for calendar year 1995  

Science Conference Proceedings (OSTI)

This report presents the environmental report for the Argonne National Laboratory-East for the year of 1995. Topics discussed include: general description of the site including climatology, geology, seismicity, hydrology, vegetation, endangered species, population, water and land use, and archaeology; compliance summary; environmental program information; environmental nonradiological program information; ground water protection; and radiological monitoring program.

Golchert, N.W.; Kolzow, R.G. [Environmental Management Operation, Argonne National Lab., IL (United States)

1996-09-01T23:59:59.000Z

273

DOE KSU EV Site Operator Program. [United States Department of Energy (DOE) Kansas State University (KSU) Electric Vehicle (EV)  

SciTech Connect

Kansas State University, with funding from federal, state, public, and private companies, is participating in the DOE Electric Vehicle Site Operator Program. Kansas State is demonstrating, testing, and evaluating electric of hybrid vehicle technology. This will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four(4) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort station wagons. This quarter's report describes ongoing public relations activities and meetings as well as presenting performance data for the electric vehicles. (GHH)

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1992-01-01T23:59:59.000Z

274

DOE KSU EV Site Operator Program. [United States Department of Energy (DOE) Kansas State University (KSU) Electric Vehicle (EV)  

DOE Green Energy (OSTI)

Kansas State University, with funding from federal, state, public, and private companies, is participating in the DOE Electric Vehicle Site Operator Program. Kansas State is demonstrating, testing, and evaluating electric of hybrid vehicle technology. This will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four(4) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort station wagons. This quarter's report describes ongoing public relations activities and meetings as well as presenting performance data for the electric vehicles. (GHH)

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1992-01-01T23:59:59.000Z

275

Hanford Site Environmental Safety and Health Fiscal Year 2001 Budget-Risk management summary  

SciTech Connect

The Hanford Site Environment, Safety and Health (ES&H) Budget-Risk Management Summary report is prepared to support the annual request to sites in the U.S. Department of Energy (DOE) Complex by DOE, Headquarters. The request requires sites to provide supplementary crosscutting information related to ES&H activities and the ES&H resources that support these activities. The report includes the following: (1) A summary status of fiscal year (FY) 1999 ES&H performance and ES&H execution commitments; (2)Status and plans of Hanford Site Office of Environmental Management (EM) cleanup activities; (3) Safety and health (S&H) risk management issues and compliance vulnerabilities of FY 2001 Target Case and Below Target Case funding of EM cleanup activities; (4) S&H resource planning and crosscutting information for FY 1999 to 2001; and (5) Description of indirect-funded S&H activities.

REEP, I.E.

1999-05-12T23:59:59.000Z

276

Hanford Site near-facility environmental monitoring data report for calendar year 1998  

Science Conference Proceedings (OSTI)

This document summarizes the results of the U.S. Department of Energy's Near-Facility Environmental Monitoring program conducted by Waste Management Federal Services of Hanford, Inc. for Fluor Daniel Hanford, Inc. for 1998 in the 100,200/600, and 300/400 Areas of the Hanford Site, in southcentral Washington State. Surveillance activities included sampling and analyses of ambient air, surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with federal, state, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

DIEDIKER, L.P.

1999-07-29T23:59:59.000Z

277

Argonne National Laboratory-East summary site environmental report for calendar year 2002.  

DOE Green Energy (OSTI)

Argonne performs research and development in many areas of science and technology. General fields of research at Argonne include, but are not limited to, biosciences, biotechnology, chemical engineering, chemistry, decision and information sciences, energy systems and technology, high energy physics, materials science, math and computer science, nuclear reactors, physics, and environmental science. Argonne is not, and never has been, a weapons laboratory. Several missions provide focus for Argonne scientists. Basic research helps better understand the world, and applied research helps protect and improve it. For example, the prairies of Argonne provide sites for environmental studies that provide valuable information about invader species and the food webs within ecosystems. Argonne also operates world-class research facilities, such as the Advanced Photon Source (APS), which is a national research facility funded by the U.S. Department of Energy (DOE). Scientists use high brilliance X-rays from the APS for basic and applied research in many fields. Argonne also seeks to ensure our energy future. Currently, scientists and engineers are developing cleaner and more efficient energy sources, such as fuel cells and advanced electric power generation. Argonne has spent much of its history on developing nuclear reactor technology. That research is now being applied to American and Soviet nuclear reactors to improve the safety and life of the reactors. Other Argonne research seeks to improve the way we manage our environment. For example, Argonne scientists created a new catalyst that could help carmakers eliminate 95 percent of nitrogen-oxide emitted by diesel engines by the year 2007. Research and development solutions such as these will help protect our ecosystems.

Golchert, N. W.; Kolzow, R. G.

2004-03-08T23:59:59.000Z

278

Results of the first year of operation at Embalse Nuclear Power Station in Argentina  

SciTech Connect

As a part of the International Remote Monitoring Project, during March 1995, a Remote Monitoring System (RMS) was installed at the Embalse Nuclear Power Station in Embalse, Argentina. This system monitors the status of four typical Candu spent fuel dry storage silos. The monitoring equipment for each silo consists of analog sensors for temperature and gamma radiation measurement; digital sensors for motion detection; and electronic fiber-optic seals. The monitoring system for each silo is connected to a wireless Authenticate Item Monitoring System (AIMS). This paper describes the operation of the RMS during the first year of the trial and presents the results of the signals reported by the system compared with the on site inspections conducted by the regulatory bodies, ABACC, IAEA, ENREN. As an additional security feature, each sensor periodically transmits authenticated State-of-Health (SOH) messages. This feature provides assurance that all sensors are operational and have not been tampered with. The details of the transmitted information and the incidents of loss of SOH, referred to as Missing SOH Event, and the possible causes which produced the MSOHE are described. The RMS at the embalse facility uses gamma radiation detectors in a strong radiation field of spent fuel dry storage silos. The detectors are Geiger Muller tubes and Silicon solid state diodes. The study of the thermal drift of electronics in GM detectors and the possible radiation damage in silicon detectors is shown. Since the initial installation, the system has been successfully interrogated from Buenos Aires and Albuquerque. The experience gained, and the small changes made in the hardware in order to improve the performance of the system is presented.

Bonino, A.; Pizarro, L.; Higa, Z. [Ente Nacional Regulador Nuclear, Buenos Aires (Argentina); Dupree, S.A.; Schoeneman, J.L. [Sandia National Labs., Albuquerque, NM (United States)

1996-07-16T23:59:59.000Z

279

DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exercises 5 Year Option on Washington TRU Solutions Contract to Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP January 18, 2005 - 9:55am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) announced today that it has decided to exercise the five year option in the Washington TRU Solutions LLC ("WTS") contract to continue managing and operating the Department's Waste Isolation Pilot Plant (WIPP), located in New Mexico. The option DOE exercised is a part of the WIPP contract that was competitively procured in 2000. The WTS contract will now run through September 30, 2010 with an estimated value over the five year timeframe of approximately $704 million. "We are very pleased to take this step," said Kyle McSlarrow, Deputy

280

Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site  

SciTech Connect

The NTS solid waste disposal sites must be permitted by the state of Nevada Solid Waste Management Authority (SWMA). The SWMA for the NTS is the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). The U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as land manager (owner), and National Security Technologies (NSTec), as operator, will store, collect, process, and dispose all solid waste by means that do not create a health hazard, a public nuisance, or cause impairment of the environment. NTS disposal sites will not be included in the Nye County Solid Waste Management Plan. The NTS is located approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The Area 5 RWMS is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NTS (Figure 2), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. A Notice of Intent to operate the disposal site as a Class III site was submitted to the state of Nevada on January 28, 1994, and was acknowledged as being received in a letter to the NNSA/NSO on August 30, 1994. Interim approval to operate a Class III SWDS for regulated asbestiform low-level waste (ALLW) was authorized on August 12, 1996 (in letter from Paul Liebendorfer to Runore Wycoff), with operations to be conducted in accordance with the ''Management Plan for the Disposal of Low-Level Waste with Regulated Asbestos Waste.'' A requirement of the authorization was that on or before October 9, 1999, a permit was required to be issued. Because of NDEP and NNSA/NSO review cycles, the final permit was issued on April 5, 2000, for the operation of the Area 5 Low-Level Waste Disposal Site, utilizing Pit 7 (P07) as the designated disposal cell. The original permit applied only to Pit 7, with a total design capacity of 5,831 cubic yards (yd{sup 3}) (157,437 cubic feet [ft{sup 3}]). NNSA/NSO is expanding the SWDS to include the adjacent Upper Cell of Pit 6 (P06), with an additional capacity of 28,037 yd{sup 3} (756,999 ft{sup 3}) (Figure 3). The proposed total capacity of ALLW in Pit 7 and P06 will be approximately 33,870 yd{sup 3} (0.9 million ft{sup 3}). The site will be used for the disposal of regulated ALLW, small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. The only waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM). The term asbestiform is used throughout this document to describe this waste. Other TSCA waste (i.e., polychlorinated biphenyls [PCBs]) will not be accepted for disposal at the SWDS. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the U.S. Department of Energy, Nevada Operations Office (DOE/NV) 325

NSTec Environmental Programs

2010-09-14T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Review of the Sandia Site Office Quality Assurance Assessment of the Manzano Nuclear Operations, January 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the of the Sandia Site Office Quality Assurance Assessment of the Manzano Nuclear Operations January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background ........................................................................................................................................... 1 4.0 Methodology ......................................................................................................................................... 2

282

Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation Addendum1  

Office of Legacy Management (LM)

Monticello Mill Tailings Site Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation Addendum1 Focused Feasibility Study January 2004 Prepared by U.S. Department of Energy Grand Junction, Colorado Work performed under DOE Contract No. DE-AC1342GJ79491 DOE Task Order No. ST03-205 Document N u m b e r Q0029500 S i g t ~ a t u r e Page Signature Page Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation Addendud Focused Feasibility Study January 2004 Submitted By: Arthur W. Kleinrath, Project Manager U.S. Department of Energy, Grand Junction, Colorado U.S. Department of Energyat Gmnd Junction MMTS OU 111 Remedial Investigation AddendutdFocuscd Feasibilily Study January 2004 Final iii This page intentionally left blank Document Number Q0029500 Contents U.S. Department of Energy at Grand Junction MMTS OU III Remedial Investigation Addendum/Focused Feasibility Study

283

Session: Development and application of guidelines for siting, constructing, operating and monitoring wind turbines  

DOE Green Energy (OSTI)

This session at the Wind Energy and Birds/Bats workshop consisted of two presentations followed by a discussion/question and answer period. The two papers were: 'Development and Application of USFWS Guidance for Site Evaluation, Siting, Construction, Operation and Monitoring of Wind Turbines' by Albert Manville and 'Wind Power in Washington State' by Greg Hueckel. The session provided a comparison of wind project guidelines developed by the U.S. Fish and Wildlife Service (USFWS) in May 2003 and the Washington State Department of Fish and Wildlife in August 2003. Questions addressed included: is there a need or desire for uniform national or state criteria; can other states learn from Washington State's example, or from the USFWS voluntary guidelines; should there be uniform requirements/guidelines/check-lists for the siting, operation, monitoring, and mitigation to prevent or minimize avian, bat, and other wildlife impacts.

Manville, Albert; Hueckel, Greg

2004-09-01T23:59:59.000Z

284

Construction and Operation of a Tritium Extraction Facility at the Savannah Siver Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

T T E D S T A T E S O F A M E R I C A D E P A R T M E NT O F E N E R G Y DOE/EIS-0271 Construction & Operation of a Tritium Extraction Facility at the Savannah River Site Department of Energy Savannah River Operations Office Aiken, South Carolina Final Environmental Impact Statement March 1999 DOE/EIS-0271 March 1999 Preface iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement: Construction and Operation of a Tritium Extraction Facility at the Savannah River Site (DOE/EIS-0271) LOCATION: Aiken and Barnwell Counties, South Carolina CONTACT: For additional information on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy

285

Electric and Hybrid Vehicle Program: Site Operation Program. Quarterly progress report, July--September 1995  

DOE Green Energy (OSTI)

The Site Operator Program has evolved substantially since its inception in response to the Electric Vehicle Research and Demonstration Act of 1976. In its original form, a commercialization effort was intended but this was not feasible for lack of vehicle suppliers and infrastructure. Nonetheless, with DOE sponsorship and technical participation, a few results (primarily operating experience and data) were forthcoming. The current Program comprises eleven sites and over 200 vehicles, of which about 50 are latest generation vehicles. DOE partially funds the Program participant expenditures and the INEL receives operating and maintenance data for the DOE-owned, and participant-owned or monitored vehicles, as well as Program reports. As noted elsewhere in this report, participants represent several widely differing categories: electric utilities, academic institutions, and federal agencies. While both the utilities and the academic institutions tend to establish beneficial relationships with the industrial community.

Francfort, J.; Bassett, R.R.; Briasco, S. [and others

1995-12-01T23:59:59.000Z

286

Operating Water Cherenkov Detectors in high altitude sites for the Large Aperture GRB Observatory  

E-Print Network (OSTI)

Water Cherenkov Detectors (WCD) are efficient detectors for detecting GRBs in the 10 GeV - 1 TeV energy range using the single particle technique, given their sensitivity to low energy secondary photons produced by high energy photons when cascading in the atmosphere. The Large Aperture GRB Observatory (LAGO) operates arrays of WCD in high altitude sites (above 4500 m a.s.l.) in Bolivia, Mexico and Venezuela, with planned extension to Peru. Details on the operation and stability of these WCD in remote sites with high background rates of particles will be detailed, and compared to simulations. Specific issues due to operation at high altitude, atmospheric effects and solar activity, as well as possible hardware enhancements will also be presented.

Allard, D; Asorey, H; Barros, H; Bertou, X; Castillo, M; Chirinos, J M; De Castro, A; Flores, S; Gonzlez, J; Berisso, M Gomez; Grajales, J; Guada, C; Day, W R Guevara; Ishitsuka, J; Lpez, J A; Martnez, O; Melfo, A; Meza, E; Loza, P Miranda; Barbosa, E Moreno; Murrugarra, C; Nez, L A; Ormachea, L J Otiniano; Prez, G; Perez, Y; Ponce, E; Quispe, J; Quintero, C; Rivera, H; Rosales, M; Rovero, A C; Saavedra, O; Salazar, H; Tello, J C; Peralda, R Ticona; Varela, E; Velarde, A; Villaseor, L; Wahl, D; Zamalloa, M A

2009-01-01T23:59:59.000Z

287

RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3  

SciTech Connect

RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

Not Available

1993-12-01T23:59:59.000Z

288

Strategic Petroleum Reserve annual site environmental report for calendar year 1992  

Science Conference Proceedings (OSTI)

This report, provided annually in accordance with DOE Order 5400.1, summarizes monitoring data collected to assess Strategic Petroleum Reserve (SPR) impacts on the environment. The report serves as a management tool for mitigating such impacts, thus serving the public interest by ensuring environmentally sound operation of the SPR. Included in this report is a description of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1992. The active permits and the results of the environmental monitoring program (i.e., air, surface water, ground water, and water discharges) are discussed within each section by site. The quality assurance program is presented which includes results from laboratory and field audits and studies performed internally and by regulatory agencies. In general, no significant adverse environmental impact resulted from any SPR activities during 1992. Environmental areas of concern, such as potential ground water contamination, are fully addressed in the applicable section by site. The SPR continues to maintain an overall excellent environmental record.

Not Available

1993-06-01T23:59:59.000Z

289

Results from the second year of operation of the Federal Methanol Fleet at Oak Ridge National Laboratory  

DOE Green Energy (OSTI)

The Oak Ridge National Laboratory has completed its second year of operation of ten vehicles for the Federal Methanol Fleet Project; five of the vehicles are fueled with methanol. Over 56,000 miles were accumulated on the vehicles in the second year bringing the total to over 152,000 miles. Energy consumption for the methanol cars was slightly higher than that of the gasoline cars again this year, most likely as a result of shorter average trip lengths for the methanol gas. Iron and lead have accumulated at greater rates in the lubricating oil of the methanol cars. Driver's ratings of vehicles reflected some dissatisfaction with the cold-weather performance of the methanol cars, but the cars have no special provisions for cold weather starting, and the fuel vapor pressure has not been tailored to the season as at other test sites. Otherwise, drivers' opinions of the methanol cars have been favorable. 13 refs., 4 figs., 10 tabs.

West, B.H.; McGill (Oak Ridge National Lab., TN (USA)); Hillis, S.L. (Tennessee Univ., Knoxville, TN (USA))

1990-09-01T23:59:59.000Z

290

Office of Secure Transportation Twenty-Five Year Site Plan (TYSP)  

National Nuclear Security Administration (NNSA)

Secure Transportation Secure Transportation Twenty-Five Year Site Plan (TYSP) FY2013 FINAL Submitted June 29, 2012 National Nuclear Security Administration Office of Secure Transportation OST TYSP FY2013 Office of Secure Transportation Twenty-Five Year Site Plan NOTICE This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government, nor any agency thereof, nor any of their employees makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe on privately owned rights. Reference herein to any specific commercial product, process, or service by trade name,

291

Idaho National Laboratory 2013-2022 Ten-Year Site Plan  

SciTech Connect

The Idaho National Laboratory (INL) Ten-Year Site Plan (TYSP) describes the strategy for accomplishing the long-term objective of transforming the laboratory to meet Department of Energy (DOE) national nuclear research and development (R&D) goals, as outlined in DOE strategic plans. The plan links R&D mission goals and INL core capabilities with infrastructure requirements (single- and multi-program), establishs the 10-year end-state vision for INL complexes, and identifies and prioritizes infrastructure needs and capability gaps. The TYSP serves as the basis for documenting and justifying infrastructure investments proposed as part of the FY 2013 budget formulation process.

Calvin Ozaki; Sheryl L. Morton; Elizabeth A. Connell; William T. Buyers; Craig L. Jacobson; Charles T. Mullen; Christopher P. Ischay; Ernest L. Fossum; Robert D. Logan

2011-06-01T23:59:59.000Z

292

Machine Shop Safe Operations Assessment Plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2003 - Machine Shop Safe Operations July 2003 - Machine Shop Safe Operations Utilize 29 CFR 1910 Utilize applicable LLNL, LANL, DTRA, BN procedures VALUE ADDED FOR: AMTS Contractor Assurance Focus Area AMTS ISM Improvements Focus Area AMTS Safety Precursors/Hazards Analysis Focus Area AMTS Environment, Safety, & Health Division MACHINE SHOP SAFE OPERATIONS Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The purpose of this assessment is to verify that machine shop operators are provided a safe and healthful workplace which will reduce or prevent injuries, illnesses, and accidental losses. Criteria: A worker protection program shall be implemented that provides a place of employment free from recognized hazards that are causing or likely to cause

293

Grand Junction Projects Office site environmental report for calendar year 1992  

SciTech Connect

This report presents information pertaining to environmental activities conducted during calendar year 1992 at the US Department of Energy Grand Junction Projects Office (DOE-GJPO) facility in Colorado. Environmental activities conducted at the GJPO facility during 1992 included those associated with environmental compliance, site remediation, off-site dose modeling, and radiological and nonradiological monitoring. Four phases of the on-site Grand Junction Projects Office Remedial Action Project were completed in 1992. Remediation activities, which included the removal of 161,589 tons of uranium-mill-tailings-contaminated material from the facility, were conducted in compliance with all applicable permits. Off-site dose modeling for the GJPO was conducted to determine compliance with current National Emission Standards for Hazardous Air Pollutants, Subpart H, and applicable DOE Orders (5400.1 and 5400.5). The total off-site EDE to the public from all sources of radiation emanating from the facility (radon, air particulates, gamma) was calculated as 9 mrem/yr, which is well below the DOE dose limit of 100 mrem/yr above background. The radiological and nonradiological monitoring program at the GJPO facility included monitoring of activities that generate potentially hazardous or toxic wastes and monitoring of ambient air, surface water, and ground water.

Not Available

1993-05-01T23:59:59.000Z

294

US Department of Energy Nevada Operations Office annual site environmental report: 1993. Volume 1  

SciTech Connect

Monitoring and surveillance on and around the Nevada Test Site (NTS) by DOE contractors and NTS user organizations during 1993 indicated that operations on the NTS were conducted in compliance with applicable federal and DOE guidelines, i.e., the dose the maximally exposed offsite individual could have received was less than 0.04 percent of the 10 mrem per year guide for air exposure. No nuclear tests were conducted due to the moratorium. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of effluents, or resuspension was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. Using the CAP88-PC model and NTS radionuclide emissions data, the calculated effective dose equivalent to the maximally exposed individual offsite would have been 0.004 mrem. Any person receiving this dose would also have received 97 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Support facilities at off-NTS locations compiled with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

Black, S.C.; Glines, W.M.; Townsend, Y.E. [eds.

1994-09-01T23:59:59.000Z

295

: The Resumption of Criticality Experiments Facility Operations at the Nevada National Security Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resumption of Criticality Resumption of Criticality Experiments Facility Operations at the Nevada National Security Site OAS-M-13-09 September 2013 Department of Energy Washington, DC 20585 September 30, 2013 MEMORANDUM FOR THE PRINCIPAL DEPUTY ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION FROM: George W. Collard Assistant Inspector General for Audits Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Resumption of Criticality Experiments Facility Operations at the Nevada National Security Site" BACKGROUND The mission of the Criticality Experiments Facility, located at the Los Alamos National Laboratory (Los Alamos) was to conduct nuclear criticality experiments and hands-on training in nuclear safeguards, criticality safety and emergency response in support of the National

296

Draft Site-Wide EIS on the Continued Operation of the Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Responsible Agency: U.S. Department of Energy (DOE) Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agency: Incorporated County of Los Alamos Title: Draft Site-Wide Environmental Impact Statement on the Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico Contact: For further information, or to submit comments concerning this Draft Site-Wide Environmental Impact Statement (SWEIS), contact: Corey Cruz, Project Manager U.S. DOE, Albuquerque Operations Office P.O. Box 5400, Albuquerque, NM 87185 Telephone: 1-800-898-6623 Fax: 505-845-6392 For general information on DOE's National Environmental Policy Act (NEPA) process, contact: Carol Borgstrom, Director Office of NEPA Policy and Assistance (EH-42) U.S. DOE, 1000 Independence Avenue, SW, Washington, DC 20585 Telephone: 202-586-4600 or leave a message at 1-800-472-2756

297

EIS-0426: Site-Wide Environmental Impact Statement for Continued Operation of the Department of Energy / National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada  

Energy.gov (U.S. Department of Energy (DOE))

This Site-Wide EIS evaluates the potential environmental impacts of proposed alternatives for continued management and operation of the Nevada National Security Site (NNSS) (formerly known as the Nevada Test Site) and other U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA)-managed sites in Nevada.

298

Review of the Sandia Site Office Quality Assurance Assessment of the Manzano Nuclear Operations, January 2013  

NLE Websites -- All DOE Office Websites (Extended Search)

Review of the Review of the Sandia Site Office Quality Assurance Assessment of the Manzano Nuclear Operations January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background ........................................................................................................................................... 1 4.0 Methodology ......................................................................................................................................... 2

299

Radionuclide Air Emissions Report for the Hanford Site Calendar Year 1999  

SciTech Connect

This report documents radionuclide air emissions from the US. Department of Energy (DOE) Hanford Site in 1999 and the resulting effective dose equivalent to the maximally exposed individual (MEI) member of the public. The report has been prepared in accordance with the Code of Federal Regulations (CFR). Title 40, Protection of the Environment, Part 61. National Emission Standards for Hazardous Air Pollutants, Subpart H, ''National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities'', and with the Washington Administrative Code (WAC) Chapter 246-247. Radiation Protection-Air Emissions. The federal regulations in Subpart H of 40 CFR 61 require the measurement and reporting of radionuclides emitted from US. Department of Energy (DOE) facilities and the resulting offsite dose from those emissions. A standard of 10 mrem/yr effective dose equivalent (EDE) is imposed on them. The EDE to the MEI due to routine emissions in 1999 from Hanford Site point sources was 0.029 mrem (2.9 E-04 mSv), which is less than 0.3 percent of the federal standard. WAC 246-247 requires the reporting of radionuclide emissions from all Hanford Site sources, during routine as well as nonroutine operations. The state has adopted the 40 CFR 61 standard of 10 mrem/yr EDE into their regulations. The state further requires that the EDE to the MEI be calculated not only from point source emissions but also from diffuse and fugitive sources of emissions. The EDE from diffuse and fugitive emissions at the Hanford Site in 1999 was 0.039 mrem (3.9 E-04 mSv) EDE. The total dose from point sources and from diffuse and fugitive sources of radionuclide emissions during all operating conditions in 1999 was 0.068 mrem (6.8 E-04 mSv) EDE, which is less than 0.7 percent of the state standard.

ROKKAN, D.J.

2000-06-01T23:59:59.000Z

300

Rocketdyne Propulsion and Power DOE Operations annual site environmental report 1997  

SciTech Connect

This annual report discusses environmental monitoring at two manufacturing and test sites operated in the Los Angeles area by Rocketdyne Propulsion and Power of Boeing North American, Inc. These are identified as Area 4 of the SSFL and the De Soto site. These sites have been used for research and development (R and D), engineering, and testing in a broad range of technical fields primarily in energy research and nuclear reactor technology. The De Soto site had research and development laboratories involved with nuclear research. This work was terminated in 1995 and only D and D activities will have potential for impact on the environment. Since 1956, Area 4 has been used for work with nuclear materials, including fabricating nuclear reactor fuels, testing nuclear reactors, and dissembling used fuel elements. This work ended in 1988 and subsequent efforts have been directed toward decommissioning and decontamination of the former nuclear facilities. The primary purpose of this report is to present information on environmental and effluent monitoring of DOE-sponsored activities to the regulatory agencies responsible for oversight. Information presented here concentrates on Area 4 at SSFL, which is the only area at SSFL where DOE operations were performed.

Robinson, K.S. [ed.

1998-11-23T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Nevada Test Site National Emission Standards for Hazardous Air Pollutants Calendar Year 2008  

SciTech Connect

The Nevada Test Site (NTS) is operated by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office. From 1951 through 1992, the NTS was the continental testing location for U.S. nuclear weapons. The release of radionuclides from NTS activities has been monitored since the initiation of atmospheric testing. Limitation to under-ground detonations after 1962 greatly reduced radiation exposure to the public surrounding the NTS. After nuclear testing ended in 1992, NTS radiation monitoring focused on detecting airborne radionuclides from historically contaminated soils. These radionuclides are derived from re-suspension of soil (primarily by winds) and emission of tritium-contaminated soil moisture through evapotranspiration. Low amounts of tritium were also emitted to air at the North Las Vegas Facility (NLVF), an NTS support complex in the city of North Las Vegas. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) (CFR, 2008a) limits the release of radioactivity from a U.S. Department of Energy facility (e.g., the NTS) to 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This limit does not include radiation not related to NTS activities. Unrelated doses could come from naturally occurring radioactive elements or from other man-made sources such as medical treatments. The NTS demonstrates compliance with the NESHAP limit by using environmental measurements of radionuclide air concentrations at critical receptor locations. This method was approved by the U.S. Environmental Protection Agency for use on the NTS in 2001 and has been the sole method used since 2005. Six locations on the NTS have been established to act as critical receptor locations to demonstrate compliance with the NESHAP limit. These locations are actually pseudo-critical receptor stations, because no member of the public actually resides at these onsite locations. Compliance is demonstrated if the measured annual average concentration of each detected radionuclide at each of these locations is less than the NESHAP Concentration Levels (CLs) for Environmental Compliance listed in 40 CFR 61, Appendix E, Table 2 (CFR, 2008a). At any one location, if multiple radionuclides are detected then compliance with NESHAP is demonstrated when the sum of the fractions (determined by dividing each radionuclide's concentration by its CL and then adding the fractions together) is less than 1.0. In 2008, the potential dose from radiological emissions to air, from both current and past NTS activities, at onsite compliance monitoring stations was a maximum of 1.9 mrem/yr; well below the 10 mrem/yr dose limit. Air sampling data collected at all six pseudo-critical receptor stations had average concentrations of radioactivity that were a fraction of the CL values listed in Table 2 in Appendix E of 40 CFR 61 (CFR, 2008a). Concentrations ranged from less than 1 percent to a maximum of 19 percent of the allowed NESHAP limit. Because the nearest member of the public resides approximately 20 kilometers (12 miles) from the NTS boundary, concentrations at this location would be only a small fraction of that measured on the NTS. Potential dose to the public from NLVF was also very low at 0.00006 mrem/yr; more than 160,000 times lower than the 10 mrem/yr limit.

Ronald Warren and Robert F. Grossman

2009-06-30T23:59:59.000Z

302

Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington  

SciTech Connect

This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

Not Available

1993-05-01T23:59:59.000Z

303

Fiscal year 1991 report on archaeological surveys of the 100 Areas, Hanford Site, Washington  

SciTech Connect

In compliance with Section 106 of the National Historic Preservation Act (NHPA), and at the request of Westinghouse Hanford Company, the Hanford Cultured Resources Laboratory (HCRL) conducted an archaeological survey during FY 1991 of the 100-Area reactor compounds on the US Department of Energy's Hanford Site. This survey was conducted as part of a comprehensive resources review of 100-Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization activities. The work included a lite and records review and pedestrian survey of the project area following procedures set forth in the Hanford Cultural Resources Management Plan.

Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

1992-09-01T23:59:59.000Z

304

Fiscal year 1991 report on archaeological surveys of the 100 Areas, Hanford Site, Washington  

SciTech Connect

In compliance with Section 106 of the National Historic Preservation Act (NHPA), and at the request of Westinghouse Hanford Company, the Hanford Cultured Resources Laboratory (HCRL) conducted an archaeological survey during FY 1991 of the 100-Area reactor compounds on the US Department of Energy`s Hanford Site. This survey was conducted as part of a comprehensive resources review of 100-Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization activities. The work included a lite and records review and pedestrian survey of the project area following procedures set forth in the Hanford Cultural Resources Management Plan.

Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

1992-09-01T23:59:59.000Z

305

Princeton Plasma Physics Laboratory (PPPL) annual site environmental report for calendar year 1991  

Science Conference Proceedings (OSTI)

This report gives the results of the environmental activities and monitoring programs at the Princeton Plasma Physics Laboratory (PPPL) for CY91. The report is prepared to provide the US Department of Energy (DOE) and the public with information on the level of radioactive and nonradioactive pollutants, if any, added to the environment as a result of PPPL operations, as well as environmental initiatives, assessments, and programs. The objective of the Annual Site Environmental Report is to document evidence that DOE facility environmental protection programs adequately protect the environment and the public health.

Finley, V.L.; Stencel, J.R.

1992-11-01T23:59:59.000Z

306

Calendar year 2004 annual site environmental report:Sandia National Laboratories, Albuquerque, New Mexico.  

Science Conference Proceedings (OSTI)

Sandia National Laboratories, New Mexico (SNL/NM) is a government-owned, contractor-operated facility owned by the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) and managed by the Sandia Site Office (SSO), Albuquerque, New Mexico. Sandia Corporation, a wholly-owned subsidiary of Lockheed Martin Corporation, operates SNL/NM. This annual report summarizes data and the compliance status of Sandia Corporation's environmental protection and monitoring programs through December 31, 2004. Major environmental programs include air quality, water quality, groundwater protection, terrestrial surveillance, waste management, pollution prevention (P2), environmental restoration (ER), oil and chemical spill prevention, and the National Environmental Policy Act (NEPA). Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2005) and DOE Order 231.1A, Environment, Safety, and Health Reporting (DOE 2004a). (DOE 2004a).

Montoya, Amber L.; Goering, Teresa Lynn; Wagner, Katrina; Koss, Susan I.; Salinas, Stephanie A.

2005-09-01T23:59:59.000Z

307

Calendar year 2003 annual site environmental report for Sandia National Laboratories, New Mexico.  

SciTech Connect

Sandia National Laboratories, New Mexico (SNL/NM) is a government-owned, contractor-operated facility owned by the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) and managed by the Sandia Site Office (SSO), Albuquerque, New Mexico. Sandia Corporation, a wholly-owned subsidiary of Lockheed Martin Corporation, operates SNL/NM. This annual report summarizes data and the compliance status of Sandia Corporation's environmental protection and monitoring programs through December 31, 2003. Major environmental programs include air quality, water quality, groundwater protection, terrestrial surveillance, waste management, pollution prevention (P2), environmental restoration (ER), oil and chemical spill prevention, and the National Environmental Policy Act (NEPA). Environmental monitoring and surveillance programs are required by DOE Order 450.1, ''Environmental Protection Program'' (DOE 2003a) and DOE Order 231.1 Chg.2, ''Environment, Safety, and Health Reporting'' (DOE 1996).

Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie; Koss, Susan I.; Salinas, Stephanie A.

2004-09-01T23:59:59.000Z

308

Hanford site near-facility environmental monitoring annual report, calendar year 1996  

SciTech Connect

This document summarizes the results of the near-facility environmental monitoring results for 1996 in the 100, 200/600, and 300/400 areas of the Hanford Site in south-central Washington State. Surveillance activities included sampling and analyses of ambient air, surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. The monitoring implements applicable portions of DOE Orders 5400.1 (DOE 1988a), 5400.5 (DOE 1990), and 5820.2A (DOE 1988b); Washington Administrative Code (WAC) 246-247; and Title 40 Code of Federal Regulations (CFR) Part 61, Subpart H (EPA 1989). In addition, diffuse sources were monitored to determine compliance with federal, state, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels were slightly elevated when compared to offsite locations, the differences are less than in previous years.

Perkins, C.J.

1997-08-05T23:59:59.000Z

309

Results from the second year of operation of the federal methanol fleet at Lawrence Berkeley Laboratory  

DOE Green Energy (OSTI)

This interim report describes the second year's operation of the methanol fleet at Lawrence Berkeley Laboratory (LBL) in Berkeley, California. The fleet consists of five 1984 methanol-fueled Chevrolet Citation sedans paired with five comparable gasoline-fueled Citations for comparison. Data have been collected and tabulated on fuel consumption, maintenance records, oil sample analyses, and driver perceptions of vehicle operability. Fuel efficiency was slightly improved as compared to the first year for both the methanol and gasoline vehicles. The methanol vehicles continued to experience slightly less energy efficiency than the gasoline vehicles. Maintenance data reveal that the methanol vehicles required substantially more service than the gasoline vehicles, which may be due partially to a greater sensitivity on the part of users about methanol vehicle problems. Oil sample analyses revealed that engine wear rates are lower for the second year as compared to the first year and are probably not cause for great alarm. Drivers still rate all of the vehicles quite highly, but the methanol vehicles were rated not as highly during the second year of operation as in the first year. 5 refs., 1 figs., 16 tabs.

McGill, R.N.; Hillis, S.L.

1988-08-01T23:59:59.000Z

310

File:Large Construction Site Notice for Primary Operators.pdf | Open Energy  

Open Energy Info (EERE)

Primary Operators.pdf Primary Operators.pdf Jump to: navigation, search File File history File usage Metadata File:Large Construction Site Notice for Primary Operators.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 866 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 17:00, 10 April 2013 Thumbnail for version as of 17:00, 10 April 2013 1,275 × 1,650 (866 KB) Alevine (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Metadata This file contains additional information, probably added from the digital

311

I Atlas Relocation and Operation At the Nevada Test Site Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Atlas Relocation and Operation Atlas Relocation and Operation At the Nevada Test Site Final Environmental Assessment May 2001 Department of Energy National Nuclear Security Administration Nevada Operations Office Las Vegas, Nevada Available for sale to the Public, in paper, from U.S. Department of Commerce National Teclmical Information Service 5285 Port Royal Road Springfield, VA 22 161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@,ntis.fed~vorId.gov Online Ordering: http:llwww.ntis.gov/ordering.htm Available electronically at: http:ilwww.doe.govibridge Available for a processing fee to U.S. Department of Energy and its contractors in paper from-- U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 3783 1-0062 Phone: 865.576.8401

312

File:Large Construction Site Notice for Secondary Operators.pdf | Open  

Open Energy Info (EERE)

Secondary Operators.pdf Secondary Operators.pdf Jump to: navigation, search File File history File usage Metadata File:Large Construction Site Notice for Secondary Operators.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 883 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 17:04, 10 April 2013 Thumbnail for version as of 17:04, 10 April 2013 1,275 × 1,650 (883 KB) Alevine (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Metadata This file contains additional information, probably added from the digital

313

US Department of Energy DOE Nevada Operations Office, Nevada Test Site: Underground safety and health standards  

Science Conference Proceedings (OSTI)

The Nevada Test Site Underground Safety and Health Standards Working Group was formed at the direction of John D. Stewart, Director, Nevada Test Site Office in April, 1990. The objective of the Working Group was to compile a safety and health standard from the California Tunnel Safety Orders and OSHA for the underground operations at the NTS, (excluding Yucca Mountain). These standards are called the NTS U/G Safety and Health Standards. The Working Group submits these standards as a RECOMMENDATION to the Director, NTSO. Although the Working Group considers these standards to be the most integrated and comprehensive standards that could be developed for NTS Underground Operations, the intent is not to supersede or replace any relevant DOE orders. Rather the intent is to collate the multiple safety and health references contained in DOE Order 5480.4 that have applicability to NTS Underground Operations into a single safety and heath standard to be used in the underground operations at the NTS. Each portion of the standard was included only after careful consideration by the Working Group and is judged to be both effective and appropriate. The specific methods and rationale used by the Working Group are outlined as follows: The letter from DOE/HQ, dated September 28, 1990 cited OSHA and the CTSO as the safety and health codes applicable to underground operations at the NTS. These mandated codes were each originally developed to be comprehensive, i.e., all underground operations of a particular type (e.g., tunnels in the case of the CTSO) were intended to be adequately regulated by the appropriate code. However, this is not true; the Working Group found extensive and confusing overlap in the codes in numerous areas. Other subjects and activities were addressed by the various codes in cursory fashion or not at all.

Not Available

1993-05-01T23:59:59.000Z

314

Naval Petroleum and Oil Shale Reserves annual report of operations for fiscal year 1996  

SciTech Connect

During fiscal year 1996, the Department of Energy continued to operate Naval Petroleum Reserve No. 1 in California and Naval Petroleum Reserve No. 3 in Wyoming through its contractors. In addition, natural gas operations were conducted at Naval Petroleum Reserve No. 3. All productive acreage owned by the Government at Naval Petroleum Reserve No. 2 in California was produced under lease to private companies. The locations of all six Naval Petroleum and Oil Shale Reserves are shown in a figure. Under the Naval Petroleum Reserves Production Act of 1976, production was originally authorized for six years, and based on findings of national interest, the President was authorized to extend production in three-year increments. President Reagan exercised this authority three times (in 1981, 1984, and 1987) and President Bush authorized extended production once (in 1990). President Clinton exercised this authority in 1993 and again in October 1996; production is presently authorized through April 5, 2000. 4 figs. 30 tabs.

1996-12-31T23:59:59.000Z

315

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010  

SciTech Connect

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

CH2MHILL B& W West Valley, LLC

2011-09-28T23:59:59.000Z

316

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDPs environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

West Valley Environmental Services LLC (WVES) and URS - Washington Division

2009-09-24T23:59:59.000Z

317

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009  

SciTech Connect

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOEs effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

West Valley Environmental Services LLC (WVES) and URS Corporation

2010-09-17T23:59:59.000Z

318

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011  

Science Conference Proceedings (OSTI)

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOEs effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

CH2M HILL B& W West Valley, LLC

2012-09-27T23:59:59.000Z

319

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012  

SciTech Connect

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOEs effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Rendall, John D. [CH2M HILL B& W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL B& W West Valley, LLC (CHBWV)

2013-09-19T23:59:59.000Z

320

Rocketdyne Propulsion and Power DOE operations annual site environmental report 1996  

SciTech Connect

Rocketdyne currently operates several facilities in the San Fernando Valley/Simi Valley area, for manufacturing, testing, and research and development (R and D). These operations include manufacturing liquid-fueled rocket engines, such as the Space Shuttle Main Engine (SSME) and engines used for expendable launch vehicles used to place artificial satellites into orbit. This work includes fabrication and testing of rocket engines, lasers, and heat-transfer systems; and R and D in a wide range of high-technology fields, such as the electrical power system for the Space Station. Previously, this work also included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International Division (AI). AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. This nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. The majority of this work is done for the Department of Energy (DOE). This Annual Site Environmental Report for 1996 concentrates on the environmental conditions related to DOE operations at Area IV of SSFL and at De Soto.

Tuttle, R.J. [ed.

1997-11-10T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

DOE - Office of Legacy Management -- South Valley Superfund Site...  

Office of Legacy Management (LM)

Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Department...

322

Waste Isolation Pilot Plant site environmental report, for calendar year 1995  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires DOE facilities, that conduct environmental protection programs, to annually prepare a Site Environmental Report (SER). The purpose of the SER is to provide an abstract of environmental assessments conducted in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit. The content of this SER is not restricted to a synopsis of the required data, in addition, information pertaining to new and continued monitoring and compliance activities during the 1995 calendar year are also included. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP). The EMP provides inclusive guidelines implemented to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater. air, soil, and biotic matrices are monitored for an array of radiological and nonradiological factors. The baseline radiological surveillance program encompasses a broader geographic area that includes nearby ranches, villages, and cities. Most elements of nonradiological assessments are conducted within the geographic vicinity of the WIPP site.

NONE

1996-09-01T23:59:59.000Z

323

Waste Isolation Pilot Plant site environmental report for calendar year 1994  

SciTech Connect

US Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires each DOE facility that conducts significant environmental protection programs to prepare an Annual Site Environmental Report (ASER). The purpose of the ASER is to summarize environmental data in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts. This ASER not only documents the required data, it also documents new and continued monitoring and compliance activities during the 1994 calendar year. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP) (DOE/WIPP 94-024). The EMP defines a comprehensive set of parameters that must be monitored to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater, air, soil, and biotics are monitored for radiological and nonradiological activity levels. The baseline radiological surveillance program covers the broader geographic area that encompasses nearby ranches, villages, and cities. Nonradiological studies focus on the area immediately surrounding the WIPP site.

NONE

1995-06-01T23:59:59.000Z

324

Inventory of chemicals used at Hanford Site production plants and support operations (1944-1980)  

SciTech Connect

A complete list of chemicals used in the production facilities and support operations of the US Department of Energy Hanford Site is presented to aid development of plans for characterizing the radioactive liquid chemical wastes stored in the 149 single-shell tanks. The complete chemical list is compared to the list provided by the regulatory agencies to identify hazardous chemicals stored in the single-shell tanks. A reduced list has been developed by others and is used to identify the chemical constituents for analysis in the Waste Characterization Plan for the Hanford Site Single-Shell Tanks. The chemical list is based on chemical process flowsheets, essential material consumption records, letters, reports, and other historical data. 14 refs., 36 tabs.

Klem, M. J.

1990-04-01T23:59:59.000Z

325

Operations Authorization Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Authorization Operations Authorization Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project. Criteria: Conditions and requirements should be established to ensure programs addressing all applicable functional areas are adequately implemented to support safe performance of the work. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work. Personnel shall be responsible and accountable for performance of work in accordance with the controls established. Controls established for safety are a discernible part of the plan for

326

Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006  

SciTech Connect

This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

R. P. Wells

2007-05-09T23:59:59.000Z

327

Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1992  

SciTech Connect

During fiscal year 1992, the reserves generated $473 million in revenues, a $181 million decrease from the fiscal year 1991 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $200 million, resulting in net cash flow of $273 million, compared with $454 million in fiscal year 1991. From 1976 through fiscal year 1992, the Naval Petroleum and Oil Shale Reserves generated more than $15 billion in revenues and a net operating income after costs of $12.5 billion. In fiscal year 1992, production at the Naval Petroleum Reserves at maximum efficient rates yielded 26 million barrels of crude oil, 119 billion cubic feet of natural gas, and 164 million gallons of natural gas liquids. From April to November 1992, senior managers from the Naval Petroleum and Oil Shale Reserves held a series of three workshops in Boulder, Colorado, in order to build a comprehensive Strategic Plan as required by Secretary of Energy Notice 25A-91. Other highlights are presented for the following: Naval Petroleum Reserve No. 1--production achievements, crude oil shipments to the strategic petroleum reserve, horizontal drilling, shallow oil zone gas injection project, environment and safety, and vanpool program; Naval Petroleum Reserve No. 2--new management and operating contractor and exploration drilling; Naval Petroleum Reserve No. 3--steamflood; Naval Oil Shale Reserves--protection program; and Tiger Team environmental assessment of the Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming.

1992-12-31T23:59:59.000Z

328

NETL: News Release - Solid Oxide Fuel Cell Reaches One Year of Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

January 31, 2000 January 31, 2000 Solid Oxide Fuel Cell Reaches One Year of Operations Netherlands Test Boosts Confidence for Commercial Introduction by 2004 An experimental all solid-state fuel cell - the possible prototype for a future "combustion-less" power plant - has passed a key milestone in a joint public-private development effort. Schematic Diagram of Tubular Solid Oxide Fuel Cell The Siemens Westinghouse solid oxide fuel cell is a tubular arrangement of concentric ceramic electrodes and a solid-state electrolyte. Siemens-Westinghouse Power Corp., headquartered in Orlando, FL, announced this week that its 100-kilowatt solid oxide fuel cell power system, the world's largest, has completed one year of total operating time, the longest any fuel cell of this type and size has run. The milestone marked

329

Operational Implementation of the MARSSIM Process at the Wayne Interim Storage Site  

DOE Green Energy (OSTI)

This paper describes the methodologies behind the operational implementation of the Multi Agency Radiation Site Survey and Investigation Manual (MARSSIM) process at the Wayne Interim Storage Site (WISS). The United States Army Corps of Engineers (USACE) and Environmental Chemical Corporation (ECC) have implemented the MARSSIM process using various surveys producing raw data. The final remedial status of a survey unit is derived through data reduction, while maintaining a high degree of efficiency in the construction aspects of the remedial action. Data reduction of field measurements is accomplished by merging the data outputs of a Digital Global Positioning System, an exposure rate meter, and laboratory analyses to produce maps which present exposure rates, elevations, survey unit boundaries, direct measurement locations, and sampling locations on a single map. The map serves as a data-posting plot and allows the project team to easily judge the survey unit's remedial status. The operational implementation of the MARSSIM process has been successful in determining the eligibility of survey units for final status surveys at the WISS and also in demonstrating final status radiological and chemical conditions while maintaining an efficient remedial action effort.

Hays, D. C. Jr.; Trujillo, P. A. IV.; Zoller, S. G.

2002-02-27T23:59:59.000Z

330

Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Effluent Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Test Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.

K. B. Campbell

2002-09-01T23:59:59.000Z

331

Recommended Changes to Guidelines for Operating an Interim On-Site Low Level Radioactive Waste Storage Facility - For NRC Review  

Science Conference Proceedings (OSTI)

The majority of commercial U.S. nuclear stations have constructed on-site low-level waste (LLW) storage facilities, and most of these same utilities are experiencing or have experienced at least one period of interim on-site storage. EPRI has issued two revisions of Guidelines for Operating an Interim On-Site Low Level Radioactive Waste Storage Facility. Revision 1 of these Guidelines focused on operational considerations and incorporated many of the lessons learned while operating various types of LLW s...

2011-12-19T23:59:59.000Z

332

Sandia National Laboratories site-wide hydrogeologic characterization project calendar year 1992 annual report  

Science Conference Proceedings (OSTI)

The Sandia National Laboratories, New Mexico (SNL/NM) Site-Wide Hydrogeologic Characterization (SWHC) project has been implemented as part of the SNL/NM Environmental Restoration (ER) Program to develop the regional hydrogeologic framework and baseline for the approximately 100 mi of Kirtland Air Force Base (KAFB) and adjacent withdrawn public lands upon which SNL/NM has performed research and development activities. Additionally, the SWHC project will investigate and characterize generic hydrogeologic issues associated with the 172 ER sites owned by SNL/NM across its facilities on KAFB. As called for in the Hazardous and Solid Waste Amendments (HSWA) to the Resource Conservation and Recovery Act (RCRA) Part B permit agreement between the U.S. Environmental Protection Agency (EPA) as the permitter and the U.S. Department of Energy (DOE) and SNL/NM as the permittees, an annual report is to be prepared by the SWHC project team. This document serves two primary purposes: (1) to identify and describe the conceptual framework for the hydrogeologic system underlying SNL/NM and (2) to describe characterization activities undertaken in the preceding year that add to our understanding (reduce our uncertainties) regarding the conceptual and quantitative hydrogeologic framework. This SWHC project annual report focuses primarily on purpose 1, providing a summary description of the current {open_quotes}state of knowledge{close_quotes} of the Sandia National Laboratories/Kirtland Air Force Base (SNL/KAFB) hydrogeologic setting.

Crowson, D.; Gibson, J.D.; Haase, C.S.; Holt, R.; Hyndman, D.; Krumhansl, J.; Lauffer, F.; McCord, J.P.; McCord, J.T.; Neel, D. [and others

1993-10-01T23:59:59.000Z

333

TECHNICAL EVALUATION OF SOIL REMEDIATION ALTERNATIVES AT THE BUILDING 812 OPERABLE UNIT, LAWRENCE LIVERMORE NATIONAL LABORATORY SITE 300  

SciTech Connect

The Department of Energy Livermore Site Office requested a technical review of remedial alternatives proposed for the Building 812 Operable Unit, Site 300 at the Lawrence Livermore National Laboratory. The team visited the site and reviewed the alternatives proposed for soil remediation in the draft RI/FS and made the following observations and recommendations. Based on the current information available for the site, the team did not identify a single technology that would be cost effective and/or ecologically sound to remediate DU contamination at Building 812 to current remedial goals. Soil washing is not a viable alternative and should not be considered at the site unless final remediation levels can be negotiated to significantly higher levels. This recommendation is based on the results of soil washing treatability studies at Fernald and Ashtabula that suggest that the technology would only be effective to address final remediation levels higher than 50 pCi/g. The technical review team identified four areas of technical uncertainty that should be resolved before the final selection of a preferred remedial strategy is made. Areas of significant technical uncertainty that should be addressed include: (1) Better delineation of the spatial distribution of surface contamination and the vertical distribution of subsurface contamination in the area of the firing table and associated alluvial deposits; (2) Chemical and physical characterization of residual depleted uranium (DU) at the site; (3) Determination of actual contaminant concentrations in air particulates to support risk modeling; and (4) More realistic estimation of cost for remedial alternatives, including soil washing, that were derived primarily from vendor estimates. Instead of conducting the planned soil washing treatability study, the team recommends that the site consider a new phased approach that combines additional characterization approaches and technologies to address the technical uncertainty in the remedial decision making. The site should redo the risk calculations as the future use scenario has changed for the site. As a result, the existing model is based on very conservative assumptions that result in calculation of unreasonably low cleanup goals. Specifically, the review team proposes that LLNL consider: (1) Revising the industrial worker scenario to a reasonable maximum exposure (RME) for a site worker that performs a weekly walk down of the area for two hours for 25 years (or an alternative RME if the exposure scenario changes); (2) Revising the ESSI of 2 mg U per kg soil for the deer mouse to account for less than 0.05 of the total ingested uranium being adsorbed by the gut; (3) Revising bioaccumulation factors (BAFs) for vegetation and invertebrates that are based on 100 mg of soluble uranium per kg of soil, as the uranium concentration in the slope soil does not average 100 mg/kg and it is not all in a soluble form; and (4) Measuring actual contaminant concentrations in air particulates at the site and using the actual values to support risk calculations. The team recommends that the site continue a phased approach during remediation. The activities should focus on elimination of the principal threats to groundwater by excavating (1) source material from the firing table and alluvial deposits, and (2) soil hotspots from the surrounding slopes with concentrations of U-235 and U-238 that pose unacceptable risk. This phased approach allows the remediation path to be driven by the results of each phase. This reduces the possibility of costly 'surprises', such as failure of soil treatment, and reduces the impact of remediation on endangered habitat. Treatment of the excavated material with physical separation equipment may result in a decreased volume of soil for disposal if the DU is concentrated in the fine-grained fraction, which can then be disposed of in an offsite facility at a considerable cost savings. Based on existing data and a decision to implement the recommended phased approach, the cost of characterization, excavation and physical

Eddy-Dilek, C.; Miles, D.; Abitz, R.

2009-08-14T23:59:59.000Z

334

Argonne National Laboratory summary site environmental report for calendar year 2007.  

Science Conference Proceedings (OSTI)

This summary of Argonne National Laboratory's Site Environmental Report for calendar year 2007 was written by 20 students at Downers Grove South High School in Downers Grove, Ill. The student authors are classmates in Mr. Howard's Bio II course. Biology II is a research-based class that teaches students the process of research by showing them how the sciences apply to daily life. For the past seven years, Argonne has worked with Biology II students to create a short document summarizing the Site Environmental Report to provide the public with an easy-to-read summary of the annual 300-page technical report on the results of Argonne's on-site environmental monitoring program. The summary is made available online and given to visitors to Argonne, researchers interested in collaborating with Argonne, future employees, and many others. In addition to providing Argonne and the public with an easily understandable short summary of a large technical document, the participating students learn about professional environmental monitoring procedures, achieve a better understanding of the time and effort put forth into summarizing and publishing research, and gain confidence in their own abilities to express themselves in writing. The Argonne Summary Site Environmental Report fits into the educational needs for 12th grade students. Illinois State Educational Goal 12 states that a student should understand the fundamental concepts, principles, and interconnections of the life, physical, and earth/space sciences. To create this summary booklet, the students had to read and understand the larger technical report, which discusses in-depth many activities and programs that have been established by Argonne to maintain a safe local environment. Creating this Summary Site Environmental Report also helps students fulfill Illinois State Learning Standard 12B5a, which requires that students be able to analyze and explain biodiversity issues, and the causes and effects of extinction. The same standard requires that Illinois students examine the impact of diminishing biodiversity due to human activity. An example of this would be the Argonne Restoration Prairie, which is discussed within the report. Because humans had to destroy part of a natural prairie in order to build, they must also plant an equivalent amount of prairie to make up for what was destroyed. The summary project perfectly meets Illinois State Learning Standard 13B section 5b, which requires students to be able to design and conduct an environmental impact study, analyze findings, and justify recommendations. Students volunteered for the project for two main reasons: We would become published authors, and could include that fact on important documents, like college applications, and we felt we were doing a good deed for the public, considering that without our summary the public may have no real idea how Argonne complies with various environmental protection acts and programs within the state. The summarization process was not easy, considering that we had never seen much of this kind of information before, especially in such detail. The project required a high level of commitment from all involved. This commitment ensured that the summary would be done on time and would be available to the public in the shortest time possible. Argonne representatives Norbert Golchert and Dave Baurac met with students and gave background information on Argonne and explained the importance of the research being done. In addition, they explained in-depth how the public benefits from the summarization. At the end of the presentation, students asked some questions, which were answered in specifics. The Report was divided into 10 sections, with groups of two students covering each section. The groups were eager to begin work on their assigned sections. After reading the complete report each group focused on a particular section. After much careful reading and analysis, we produced an outline. From the outline, partners divided work equally and began to carefully summarize. Groups summaries were edited,

Golchert, N. W.

2009-05-22T23:59:59.000Z

335

The National Energy Technology Laboratory Annual Site Environmental Report for Calendar Year 2002  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Report Environmental Report For Calendar Year 2002 U . S . D e p a r t m e n t o f E n e r g y * O f f i c e o f F o s s i l E n e r g y N a t i o n a l E n e r g y T e c h n o l o g y L a b o r a t o r y DOE/NETL-2004/1201 2 DOE/NETL-2004/1201 The National Energy Technology Laboratory Annual Site Environmental Report for Calendar Year 2002 October 2003 U.S. Department of Energy National Energy Technology Laboratory Morgantown, West Virginia Pittsburgh, Pennsylvania Tulsa, Oklahoma Fairbanks, Alaska NETL Customer Service Line: (800) 553-7681 NETL Homepage: www.netl.doe.gov 3 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or

336

Idaho National Laboratory 2015-2023 Ten-Year Site Plan  

SciTech Connect

This Idaho National Laboratory (INL) Ten-Year Site Plan (TYSP) describes the strategy for accomplishing the long-term objective of sustaining the INL infrastructure to meet the Department of Energy Office of Nuclear Energy (DOE-NE) mission: to promote nuclear power as a resource capable of making major contributions in meeting the nations energy supply, environmental and energy security needs. This TYSP provides the strategy for INL to accomplish its mission by: (1) linking R&D mission goals to core capabilities and infrastructure requirements; (2) establishing a ten-year end-state vision for INL facility complexes; (3) identifying and prioritizing infrastructure needs and capability gaps; (4) establishing maintenance and repair strategies that allow for sustainment of mission-critical (MC) facilities; and (5) applying sustainability principles to each decision and action. The TYSP serves as the infrastructure-planning baseline for INL; and, though budget formulation documents are informed by the TYSP, it is not itself a budget document.

Sheryl Morton; Elizabeth Connell; Bill Buyers; John Reisenauer; Rob Logan; Chris Ischay; Ernest Fossum; Paul Contreras; Joel Zarret; Steve Hill; Jon Tillo

2013-09-01T23:59:59.000Z

337

Hanford Site near-facility environmental monitoring annual report, calendar year 1997  

SciTech Connect

Near-facility environmental monitoring provides a means to measure the impacts of operations, waste management, and remediation activities on the environment adjacent to facilities and ensure compliance with local, state, and federal environmental regulations. Specifically, near-facility environmental monitoring monitors new and existing sites, processes, and facilities for potential impacts and releases; fugitive emissions and diffuse sources associated with contaminated areas, facilities (both active and those undergoing surveillance and maintenance), and environmental restoration activities. External radiation, ambient air particulates, ground and surface water, soil, sediment, and biota (plants and animals) are sampled or monitored. Parameters include, as appropriate, radionuclides; radiation fields; chemical or physical constituents, such as nitrates; pH; and water temperature. All ambient air results were below the US Department of Energy (DOE) Derived Concentration Guides (DCGs). Groundwater concentrations at the two wells at the 107-N Facility were below both the DOE DCG and US Environmental Protection Agency Interim Drinking Water Standards for gamma emitting radionuclides. Soil and vegetation results were generally within historic ranges and mostly below the Accessible Soil Concentration limits (included in HNF-PRO-454, Inactive Waste Sites) with the exception of one soil sampling location at 1 00 N Area. External radiation fields continued an overall downward trend. Surface water disposal unit samples (water, sediment, and aquatic vegetation) showed radionuclide concentrations below their respective DCG and Accessible Soil Concentration limits. The 100 N Area Columbia river shoreline springs results were below DCGs with the exception of one Sr concentration. More than 4,600 ha (11,300 acres) of radiologically controlled areas were surveyed in 1997, approximately the same as in 1996.

Perkins, C.J.

1998-07-28T23:59:59.000Z

338

Analytical Electron Microscopy examination of uranium contamination at the DOE Fernald operation site  

SciTech Connect

Analytical Electron Microscopy (AEM) has been used to identify uranium-bearing phases present in contaminated soils from the DOE Fernald operation site. A combination of optical microscopy, scanning electron microscopy with backscattered electron detection (SEM/BSE), and AEM was used in isolating and characterizing uranium-rich regions of the contaminated soils. Soil samples were prepared for transmission electron microscopy (TEM) by ultramicrotomy using an embedding resin previously employed for aquatic colloids and biological samples. This preparation method allowed direct comparison between SEM and TEM images. At the macroscopic level much of the uranium appears to be associated with clays in the soils; however, electron beam analysis revealed that the uranium is present as discrete phases, including iron oxides, silicates (soddyite), phosphates (autunites), and fluorite. Only low levels of uranium were actually within the clay minerals. The distribution of uranium phases was inhomogeneous at the submicron level.

Buck, E.C.; Dietz, N.L.; Bates, J.K.; Cunnane, J.C.

1993-02-01T23:59:59.000Z

339

Remote operation of the TFTR BES experiment from an off-site location  

SciTech Connect

The capability of controlling a diagnostic subsystem and interactively participating in the experimental program on Tokamak Fusion Test Reactor (TFTR) from a remote site has been developed and demonstrated on the TFTR BES experiment. Interactive communications are established from multiscreen remote workstations at the University of Wisconsin to the Princeton Plasma Physics Laboratory VAX cluster via multiple terminal sessions across the InterNet national network. Full control of the diagnostic, access to all relevant machine parameters and wave forms, and operations run logs are all available with automatic updates between plasma shots. A real-time count-down shot clock with timer, machine event status, and shot number provides a real-time interface to the TFTR shot sequence. This means of remote participation in a central fusion experiment provides vital experience for extrapolation to implementation on an ignition device to test engineering concepts.

Fonck, R.J.; Cosby, G.; Durst, R. (Department of Nuclear Engineering and Engineering Physics, University of Wisconsin-Madison, Madison, Wisconsin 53706 (United States)); Gibney, T.; Thompson, M.; Paul, S.F. (Princeton Plasma Physics Laboratory, Princeton, New Jersey 08543 (United States))

1992-10-01T23:59:59.000Z

340

GROUDWATER REMEDIATION AT THE 100-HR-3 OPERABLE UNIT HANFORD SITE WASHINGTON USA - 11507  

Science Conference Proceedings (OSTI)

The 100-HR-3 Groundwater Operable Unit (OU) at the Hanford Site underlies three former plutonium production reactors and the associated infrastructure at the 100-D and 100-H Areas. The primary contaminant of concern at the site is hexavalent chromium; the secondary contaminants are strontium-90, technetium-99, tritium, uranium, and nitrate. The hexavalent chromium plume is the largest plume of its type in the state of Washington, covering an area of approximately 7 km{sup 2} (2.7 mi{sup 2}) with concentrations greater than 20 {micro}g/L. Concentrations range from 60,000 {micro}g/L near the former dichromate transfer station in the 100-D Area to large areas of 20 to 100 {micro}g/L across much of the plume area. Pump-and-treat operations began in 1997 and continued into 2010 at a limited scale of approximately 200 gal/min. Remediation of groundwater has been fairly successful in reaching remedial action objectives (RAOs) of 20 {micro}g/L over a limited region at the 100-H, but less effective at 100-D. In 2000, an in situ, permeable reactive barrier was installed downgradient of the hotspot in 100-D as a second remedy. The RAOs are still being exceeded over a large portion of the area. The CH2M HILL Plateau Remediation Company was awarded the remediation contract for groundwater in 2008 and initiated a remedial process optimization study consisting of modeling and technical studies intended to enhance the remediation. As a result of the study, 1,400 gal/min of expanded treatment capacity are being implemented. These new systems are designed to meet 2012 and 2020 target milestones for protection of the Columbia River and cleanup of the groundwater plumes.

SMOOT JL; BIEBESHEIMER FH; ELUSKIE JA; SPILIOTOPOULOS A; TONKIN MJ; SIMPKIN T

2011-01-12T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

U.S. Department of Energy electric and hybrid vehicle Site Operator Program at Platte River Power Authority. Final report, July 3, 1991--August 31, 1996  

DOE Green Energy (OSTI)

The Platte River Power Authority (Platte River) is a political subdivision of the state of Colorado, owned by the four municipalities of Fort Collins, Loveland, Longmont and Estes Park, Colorado. Platte River is a non-profit, publicly owned, joint-action agency formed to construct, operate and maintain generating plants, transmission systems and related facilities for the purpose of delivering to the four municipalities electric energy for distribution and resale. Platte River, as a participant in the US Department of Energy (DOE) Site Operator Program, worked to accomplish the Site Operator Program goals and objectives to field test and evaluate electric and electric-hybrid vehicles and electric vehicle systems in a real world application/environment. This report presents results of Platte River`s program (Program) during the five-years Platte River participated in the DOE Site Operator Program. Platte River participated in DOE Site Operator Program from July 3, 1991 through August 31, 1996. During its Program, Platte River conducted vehicle tests and evaluations, and electric vehicle demonstrations in the Front Range region of Northern Colorado. Platte River also investigated electric vehicle infrastructure issues and tested infrastructure components. Platte River`s Program objectives were as follows: evaluate the year round performance, operational costs, reliability, and life cycle costs of electric vehicles in the Front Range region of Northern Colorado; evaluate an electric vehicle`s usability and acceptability as a pool vehicle; test any design improvements or technological improvements on a component level that may be made available to PRPA and which can be retrofit into vehicles; and develop, test and evaluate, and demonstrate components to be used in charging electric vehicles.

Emmert, R.A.

1996-12-31T23:59:59.000Z

342

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011  

SciTech Connect

This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

None

2012-03-01T23:59:59.000Z

343

EIS-0466: Site-wide Environmental Impact Statement for Ongoing Operations at Sandia National Laboratories, Albuquerque, New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

This Site-Wide EIS evaluates the continued operation of the DOE/NNSA activities at Sandia National Laboratories. The SWEIS will consider a No Action Alternative, which is to continue current operations through implementation of the 1999 Record of Decision and subsequent NEPA decisions, and three action alternatives proposed for consideration.

344

Waste Area Group 10, Operable Unit 10-08, Annual Monitoring Status Report for Fiscal Year 2009  

Science Conference Proceedings (OSTI)

This report documents the status of Fiscal Year 2009 groundwater monitoring performed in Waste Area Group 10 at the U.S. Department of Energy Idaho National Laboratory Site, as identified in the Groundwater Monitoring and Field Sampling Plan for Operable Unit 10-08. Twelve of the fourteen required wells were sampled, and all ten required intervals from the Westbay wells were sampled. Two wells were not sampled because they were in the process of being converted into multiple-sample-interval Westbay wells by the U.S. Geological Survey. Groundwater samples were analyzed for volatile organic compounds identified on the Contract Laboratory Program target analyte list as well as metals (filtered), anions, and radionuclides (i.e., I-129, tritium, Tc-99, gross alpha, gross beta, and Sr-90). No contaminant exceeded maximum contaminant levels in wells along the southern boundary of the Idaho National Laboratory Site or in guard wells. Iron was above its secondary maximum contaminant level of 300 ug/L in one well. The cause of the elevated iron concentration is uncertain. Lead was detected just below its action level. However, the zinc concentration was also elevated in these wells, and the source of the lead is probably galvanized riser pipe in the wells. Once the galvanized pipe is replaced, both lead and zinc concentrations should decline, as has been observed at other Waste Area Group 10 wells.

Howard Forsythe

2010-02-04T23:59:59.000Z

345

Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards-Fiscal Year 1999 Mid-Year Progress Report  

Science Conference Proceedings (OSTI)

Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, and eight in fiscal year 1998. This section summarizes how each grant addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in five areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Clean Up, and Health Effects.

Peurrung, L.M.

1999-06-30T23:59:59.000Z

346

SUMMARY OF REACTOR DESIGN INFORMATION FROM THREE YEARS' OPERATION OF A SMALL PWR  

SciTech Connect

Reactor design information obtained from 3 years' operation of a small pressurized-water reactor, the SM-1 (formerly APPR-l), is presented and discussed. The SM-1 reactor, designed to produce 10 Mw(t) power, employs fully enriched uranium fuel in the form of UO/sub 2/ dispersed in stainless-steel fuel plates. The reactor is cooled by water at 1200 psia and mean temperature of 44) deg F. Core-physics measurements were performed of temperature coefficient, pressure coefficient, rod calibration, stuck rod position, and transient xenon as a function of core burn-out. Core burn-out characteristics were compared with few- group calculations, and reasonable agreement was obtained. Thermal-heat-balance data were obtained on the reactor core. The temperature pattern in the nominal and hot channels under operating conditions was calculated. These calculations indicated that certain of the fuel channels operated in the nucleate boiling regime. Examination of one of the fuel channels suspected of nucleate boiling indicated no adverse effects. The system response to load perturbations and during pump coast-down was measured utilizing plant instrumentation. This response was compared with analytical predictions using a lumped kinetic model, and reasonable agreement was found. Both neutron and gamma traverses were made through the primary shield during reactor operation. Gamma traverses were also made through the primary shield as a function of time after reactor shutdown. Conventional shielding calculational methods are found to give agreement with experiment sufficient for design purposes. An absolute ionization chamber was employed to measure N/sup 16/ activity in the reactor coolant. These measurements were compared with N/sup 16/ calculated from the (n,p) reaction on O/ sup 16/. (auth)

Gallagher, J.G.

1960-09-01T23:59:59.000Z

347

RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington  

Science Conference Proceedings (OSTI)

The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

Not Available

1993-06-01T23:59:59.000Z

348

OPERATIONS REVIEW OF THE SAVANNAH RIVER SITE INTEGRATED SALT DISPOSITION PROCESS - 11327  

SciTech Connect

The Savannah River Site (SRS) is removing liquid radioactive waste from its Tank Farm. To treat waste streams that are low in Cs-137, Sr-90, and actinides, SRS developed the Actinide Removal Process and implemented the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). The Actinide Removal Process contacts salt solution with monosodium titanate to sorb strontium and select actinides. After monosodium titanate contact, the resulting slurry is filtered to remove the monosodium titanate (and sorbed strontium and actinides) and entrained sludge. The filtrate is transferred to the MCU for further treatment to remove cesium. The solid particulates removed by the filter are concentrated to {approx} 5 wt %, washed to reduce the sodium concentration, and transferred to the Defense Waste Processing Facility for vitrification. The CSSX process extracts the cesium from the radioactive waste using a customized solvent to produce a Decontaminated Salt Solution (DSS), and strips and concentrates the cesium from the solvent with dilute nitric acid. The DSS is incorporated in grout while the strip acid solution is transferred to the Defense Waste Processing Facility for vitrification. The facilities began radiological processing in April 2008 and started processing of the third campaign ('MarcoBatch 3') of waste in June 2010. Campaigns to date have processed {approx}1.2 million gallons of dissolved saltcake. Savannah River National Laboratory (SRNL) personnel performed tests using actual radioactive samples for each waste batch prior to processing. Testing included monosodium titanate sorption of strontium and actinides followed by CSSX batch contact tests to verify expected cesium mass transfer. This paper describes the tests conducted and compares results from facility operations. The results include strontium, plutonium, and cesium removal, cesium concentration, and organic entrainment and recovery data. Additionally, the poster describes lessons learned during operation of the facility.

Peters, T.; Poirier, M.; Fondeur, F.; Fink, S.; Brown, S.; Geeting, M.

2011-02-07T23:59:59.000Z

349

Nuclear Operations Application to Environmental Restoration at Corrective Action Unit 547, Miscellaneous Contaminated Waste Sites, at the Nevada National Security Site  

SciTech Connect

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office has responsibility for environmental restoration at the Nevada National Security Site (formerly the Nevada Test Site). This includes remediation at locations where past testing activities have resulted in the release of plutonium to the environment. One of the current remediation efforts involves a site where an underground subcritical nuclear safety test was conducted in 1964. The underground test was vented through a steel pipe to the surface in a closed system where gas samples were obtained. The piping downstream of the gas-sampling apparatus was routed belowground to a location where it was allowed to vent into an existing radioactively contaminated borehole. The length of the pipe above the ground surface is approximately 200 meters. This pipe remained in place until remediation efforts began in 2007, at which time internal plutonium contamination was discovered. Following this discovery, an assessment was conducted to determine the quantity of plutonium present in the pipe. This site has been identified as Corrective Action Unit (CAU) 547, Miscellaneous Contaminated Waste Sites. The quantity of plutonium identified at CAU 547 exceeded the Hazard Category 3 threshold but was below the Hazard Category 2 threshold specified in DOE Standard DOE-STD-1027-92. This CAU, therefore, was initially categorized as a Hazard Category 3 environmental restoration site. A contaminated facility or site that is initially categorized as Hazard Category 3, however, may be downgraded to below Hazard Category 3 if it can be demonstrated through further analysis that the form of the material and the energy available for release support reducing the hazard category. This is an important consideration when performing hazard categorization of environmental restoration sites because energy sources available for release of material are generally fewer at an environmental restoration site than at an operating facility and environmental restoration activities may result in the complete removal of source material.

Kevin Cabble (NSO), Mark Krauss and Patrick Matthews (N-I)

2011-03-03T23:59:59.000Z

350

EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement

351

2006 SitE ENvirONmENtAL rEPOrtv Each year, Brookhaven National Laboratory (BNL) prepares  

E-Print Network (OSTI)

- ronmental and worker safety risks. Initiatives to reduce, recycle, and reuse 13 million pounds of industrial. Radiological Dose Assessment Program BNL routinely assesses its operations to ensure that any potential to a hypothetical Maximally Exposed Individual (MEI) at the BNL site boundary. For dose assessment purposes

Homes, Christopher C.

352

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1999  

Science Conference Proceedings (OSTI)

The results of the 1999 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of PPPL's operations. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 1999. The Princeton Plasma Physics Laboratory has engaged in fusion energy research since 1951. The long-range goal of the U.S. Magnetic Fusion Energy Research Program is to create innovations to make fusion power a practical reality--an alternative energy source. 1999 marked the first year of National Spherical Torus Experiment (NSTX) operations and Tokamak Fusion Test Reactor (TFTR) dismantlement and deconstruction activities. A collaboration among fourteen national laboratories, universities, and research institutions, the NSTX is a major element in the U.S. Fusion Energy Sciences Program. It has been designed to test the physics principles of spherical torus (ST) plasmas. The ST concept could play an important role in the development of smaller, more economical fusion reactors. With its completion within budget and ahead of its target schedule, NSTX first plasma occurred on February 12, 1999. The 1999 performance of the Princeton Plasma Physics Laboratory was rated ''outstanding'' by the U.S. Department of Energy in the Laboratory Appraisal report issued early in 2000. The report cited the Laboratory's consistently excellent scientific and technological achievements, its successful management practices, and included high marks in a host of other areas including environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of non-radiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an area adjacent to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report.

Virginia Finley

2001-04-20T23:59:59.000Z

353

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1996  

SciTech Connect

The results of the 1996 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the US Department of Energy and the public with information on the level of radioactive and nonradioactive pollutants, if any, that are added to the environment as a result of PPPL's operations. During Calendar Year 1996, PPPL's Tokamak Fusion Test Reactor (TFTR) continued to conduct fusion experiments. Having set a world record on November 2, 1994, by achieving approximately 10.7 million watts of controlled fusion power during the deuterium-tritium (D-T) plasma experiments, researchers turned their attention to studying plasma science experiments, which included ''enhanced reverse shear techniques.'' Since November 1993, more than 700 tritium-fueled experiments were conducted, which generated more than 4 x 10(superscript 20) neutrons and 1.4 gigajoules of fusion energy. In 1996, the overall performance of Princeton Plasma Physics Laboratory was rated ''excellent'' by the US Department of Energy in the Laboratory Appraisal report issued in early 1997. The report cited the Laboratory's consistently excellent scientific and technological achievements and its successful management practices, which included high marks for environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of nonradiological contaminants, mainly volatile organic compounds (components of degreasing solvents) and petroleum hydrocarbons (past leaks of releases of diesel fuel from underground storage tanks). Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report. During 1996, PPPL completed the removal of contaminated soil from two locations that were identified through the monitoring program: petroleum hydrocarbons along a drainage swale and chromium adjacent to the cooling tower.

J.D. Levine; V.L. Finley

1998-03-01T23:59:59.000Z

354

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR CONSTRUCTION AND OPERATION OF A DEPLETED URANIUM HEXAFLUORIDE CONVERSION FACILITY AT THE PADUCAH, KENTUCKY, SITE DECEMBER 2003 U.S. Department of Energy-Oak Ridge Operations Office of Environmental Management Cover Sheet Paducah DUF 6 DEIS: December 2003 iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS) for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site (DOE/EIS-0359) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831

355

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR CONSTRUCTION AND OPERATION OF A DEPLETED URANIUM HEXAFLUORIDE CONVERSION FACILITY AT THE PORTSMOUTH, OHIO, SITE DECEMBER 2003 U.S. Department of Energy-Oak Ridge Operations Office of Environmental Management Cover Sheet Portsmouth DUF 6 DEIS: December 2003 iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS) for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site (DOE/EIS-0360) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831

356

Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1998 mid-year progress report  

SciTech Connect

Pacific Northwest National Laboratory was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996 and six (6) in Fiscal Year 1997. This section summarizes how each grant addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in four areas: Tank Waste Remediation, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Cleanup, and Health Effects.

NONE

1998-05-01T23:59:59.000Z

357

YEAR  

National Nuclear Security Administration (NNSA)

Male 2 Asian Female 1 Hispanic Male 3 Hispanic Female 6 White Male 50 White Female 11 DIVERSITY GENDER Workforce Diversity Associate Administrator for Emergency Operations (NA-40)...

358

Radionuclide air emissions report for the Hanford Site -- calendar year 1997  

SciTech Connect

This report documents radionuclide air emission from the Hanford Site in 1997, and the resulting effective dose equivalent to the maximally exposed member of the public, referred to as the MEI. The report has been prepared in accordance with reporting requirements in the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emissions Standards for Hazardous Air Pollutants, Subpart H, National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities. This report has also been prepared in accordance with the reporting requirements of the Washington Administrative Code Chapter 246-247, Radiation Protection-Air Emissions. The effective dose equivalent to the MEI from the Hanford Site`s 1997 point source emissions was 1.2 E-03 mrem (1.2 E-05 mSv), which is well below the 40 CFR 61 Subpart H regulatory limit of 10 mrem/yr. Radon and thoron emissions, exempted from 40 CFR 61 Subpart H, resulted in an effective dose equivalent to the MEI of 2.5 E-03 mrem (2.5 E-05 mSv). The effective dose equivalent to the MEI attributable to diffuse and fugitive emissions was 2.2 E-02 mrem (2.2 E-04 mSv). The total effective dose equivalent from all of the Hanford Site`s air emissions was 2.6 E-02 mrem (2.6 E-04 mSv). The effective dose equivalent from all of the Hanford Site`s air emissions is well below the Washington Administrative Code, Chapter 246-247, regulatory limit of 10 mrem/yr.

Gleckler, B.P.; Rhoads, K.

1998-06-17T23:59:59.000Z

359

YEAR  

National Nuclear Security Administration (NNSA)

Female 0 Hispanic Male 1 Hispanic Female 0 White Male 28 White Female 6 Workforce Diversity Kansas City Site Office As of March 24, 2012 PAY PLAN TOTAL WORKFORCE GENDER...

360

YEAR  

National Nuclear Security Administration (NNSA)

Female 4 Hispanic Male 5 Hispanic Female 4 White Male 30 White Female 19 Workforce Diversity Livermore Site Office As of March 24, 2012 PAY PLAN TOTAL WORKFORCE GENDER DIVERSITY...

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

YEAR  

National Nuclear Security Administration (NNSA)

Female 1 Hispanic Male 0 Hispanic Female 1 White Male 46 White Female 22 Workforce Diversity Y-12 Site Office As of March 24, 2012 PAY PLAN TOTAL WORKFORCE DIVERSITY GENDER 51...

362

YEAR  

National Nuclear Security Administration (NNSA)

Male 1 Asian Female 0 Hispanic Male 0 Hispanic Female 0 White Male 14 White Female 8 DIVERSITY GENDER Workforce Diversity Savannah River Site Office As of March 24, 2012 PAY PLAN...

363

YEAR  

National Nuclear Security Administration (NNSA)

Female 0 Hispanic Male 5 Hispanic Female 5 White Male 44 White Female 13 Workforce Diversity Pantex Site Office As of March 24, 2012 PAY PLAN TOTAL WORKFORCE DIVERSITY GENDER 57...

364

YEAR  

National Nuclear Security Administration (NNSA)

Female 0 Hispanic Male 20 Hispanic Female 11 White Male 53 White Female 17 Workforce Diversity Los Alamos Site Office As of March 24, 2012 PAY PLAN TOTAL WORKFORCE GENDER...

365

YEAR  

National Nuclear Security Administration (NNSA)

Male 2 Asian Female 4 Hispanic Male 7 Hispanic Female 5 White Male 53 White Female 19 DIVERSITY Workforce Diversity Nevada Site Office As of September 25, 2010 PAY PLAN TOTAL...

366

YEAR  

National Nuclear Security Administration (NNSA)

Female 3 Hispanic Male 7 Hispanic Female 5 White Male 52 White Female 20 Workforce Diversity Nevada Site Office As of March 24, 2012 PAY PLAN TOTAL WORKFORCE GENDER DIVERSITY 64...

367

YEAR  

National Nuclear Security Administration (NNSA)

2 Asian Female 0 Hispanic Male 13 Hispanic Female 17 White Male 37 White Female 17 DIVERSITY GENDER Workforce Diversity Sandia Site Office As of March 24, 2012 PAY PLAN TOTAL...

368

Site environmental report for calendar year 1992, Kansas City Plant, Kansas City, Missouri  

Science Conference Proceedings (OSTI)

The Kansas City Plant is a government-owned, contractor-operated facility. AlliedSignal and its predecessors have been the operating contractors since 1949. The principal operation performed at the Kansas City Plant is the manufacture of non-nuclear components for nuclear weapons. This activity involves metals and plastics machining, plastics fabrication, plating, microelectronics, and electrical and mechanical assembly. No radioactive materials are machined or processed. This report presents information and data pertaining to the environmental monitoring program and compliance with environmental standards.

Not Available

1993-05-01T23:59:59.000Z

369

The Hanford Site Richland Operations Office Office of River Protection Office of Science  

E-Print Network (OSTI)

Manager E-mail: Susan_C_Johnson@orp.doe.gov Web Site: www.hanford.gov/orp Janice Bartram Small Business

370

The National Energy Technology Laboratory Annual Site Environmental Report for Calendar Year 2002  

SciTech Connect

This Site Environmental Report was prepared by the Environmental, Safety, and Health Division at the National Energy Technology Laboratory (NETL) for the U.S. Department of Energy. The purpose of this report is to inform the public and Department of Energy stakeholders of the environmental conditions at NETL sites in Morgantown (MGN), West Virginia, Pittsburgh (PGH), Pennsylvania, Tulsa, Oklahoma, and Fairbanks, Alaska. This report contains the most accurate information that could be collected during the period between January 1, 2002, and December 31, 2002. As stated in DOE Orders 450.1 and 231.1, the purpose of the report is to: (1) Characterize site environmental management performance. (2) Confirm compliance with environmental standards and requirements. (3) Highlight significant facility programs and efforts.

National Energy Technology Laboratory

2003-10-30T23:59:59.000Z

371

Site Environmental Report for Calendar Year 2001 (GJO-2002-341...  

Office of Legacy Management (LM)

to environmental activities conducted during calendar year 2001 at the U.S. Department of Energy (DOE) Grand Junction Office (GJO) facility in Grand Junction, Colorado. WASTREN,...

372

Five-year summary and evaluation of operations and performance of the Utica aquifer and North Lake Basin Wetlands restoration project in 2004-2009.  

SciTech Connect

This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first five years (2004-2009) of this initiative. The report summarizes treatment system operational data and regulatory compliance monitoring results for the site during this period, together with the results of the targeted groundwater sampling and analysis for volatile organic compounds (VOCs) conducted in early 2010 (following completion of the fifth year of systems operation), to assess the initial five years of progress of the Utica remediation effort. On the basis of the 2003 groundwater sampling results, a remedial system employing 4 extraction wells (GWEX1-GWEX4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented with the concurrence of the CCC/USDA and the agencies (Table 1.1). The principal components of the system are shown in Figure 1.3 and are briefly described in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.

LaFreniere, L. M. (Environmental Science Division)

2011-09-13T23:59:59.000Z

373

Fiscal Year 2009 Annual Report for Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater  

SciTech Connect

This annual report summarizes maintenance, monitoring, and inspection activities performed to implement the selected remedy for Waste Area Group 3, Operable Unit 3-14, Tank Farm soil and groundwater at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Results from monitoring perched water and groundwater at the Idaho Nuclear Technology and Engineering Center are also presented.

Forsythe, Howard S.

2010-04-10T23:59:59.000Z

374

DOE - Office of Legacy Management -- New Canaan Site - CT 08  

Office of Legacy Management (LM)

Year: 1985 CT.08-2 Site Operations: None; Investigation of area prompted by public query; no site found in New Canaan. CT.08-1 Site Disposition: Eliminated - No AEC site...

375

Pacific Northwest National Laboratory Site Radionuclide Air Emissions Report for Calendar Year 2012  

SciTech Connect

This report documents radionuclide air emissions that result in the highest effective dose equivalent (EDE) to a member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations (CFR), Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), Subpart H, National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities and Washington Administrative Code (WAC) Chapter 246-247, Radiation Protection Air Emissions. The dose to the PNNL Site MEI due to routine major and minor point source emissions in 2012 from PNNL Site sources is 9E-06 mrem (9E-08 mSv) EDE. The dose from fugitive emissions (i.e., unmonitored sources) is 1E-7 mrem (1E-9 mSv) EDE. The dose from radon emissions is 2E-6 mrem (2E-08 mSv) EDE. No nonroutine emissions occurred in 2012. The total radiological dose for 2012 to the MEI from all PNNL Site radionuclide emissions, including fugitive emissions and radon, is 1E-5 mrem (1E-7 mSv) EDE, or 100,000 times smaller than the federal and state standard of 10 mrem/yr, to which the PNNL Site is in compliance.

Snyder, Sandra F.; Barnett, J. M.; Bisping, Lynn E.

2013-06-06T23:59:59.000Z

376

Pacific Northwest National Laboratory Site Radionuclide Air Emissions Report for Calendar Year 2011  

SciTech Connect

This report documents radionuclide air emissions that result in the highest effective dose equivalent (EDE) to a member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations (CFR), Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), Subpart H, National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities and Washington Administrative Code (WAC) Chapter 246-247, Radiation Protection Air Emissions. The EDE to the PNNL Site MEI due to routine emissions in 2011 from PNNL Site sources was 1.7E 05 mrem (1.7E-7 mSv) EDE. No nonroutine emissions occurred in 2011. The total radiological dose for 2011 to the MEI from all PNNL Site radionuclide emissions was more than 10,000 times smaller than the federal and state standard of 10 mrem/yr, to which the PNNL Site is in compliance.

Snyder, Sandra F.; Barnett, J. M.; Bisping, Lynn E.

2012-06-12T23:59:59.000Z

377

Surface Spectral Albedo Intensive Operational Period at the ARM SGP Site in august 2002: Results, Analysis, and Future Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Spectral Albedo Intensive Operational Period Spectral Albedo Intensive Operational Period at the ARM SGP Site in August 2002: Results, Analysis, and Future Plans A. P. Trishchenko and Y. Luo Canada Centre for Remote Sensing Ottawa, Ontario, Canada M. C. Cribb and Z. Li University of Maryland College Park, Maryland K. Hamm University of Oklahoma Norman, Oklahoma Introduction A surface spectral albedo Intensive Operational Period (IOP) at the Atmospheric Radiation Measurement (ARM) Southern Great Plains (SGP) site was conducted during August 14-19, 2002, to meet the ARM Program need in a detailed knowledge of surface boundary conditions for atmospheric radiation studies. We measured surface spectral albedos/reflectances for several representative surface types and made a survey of landcover types over an area of approximately 10 km x 10 km centered

378

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safely shipped more than 600,000 cubic meters of radioactive waste - enough to fill a string of railcars 90 miles long The PMI Project of the Year is one of the world's most...

379

Radionuclide air emissions report for the Hanford Site, calendar year 1992  

SciTech Connect

This report documents radionuclide air emissions from the Hanford Site in 1992 and the resulting effective dose equivalent to an member of the public. The report has been prepared and will be submitted in accordance with reporting requirements in the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, ``National Emissions Standards for Hazardous Air Pollutants,`` Subpart H, ``National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.``

Diediker, L.P.; Johnson, A.R. [Westinghouse Hanford Co., Richland, WA (United States); Rhoads, K.; Klages, D.L.; Soldat, J.K. [Pacific Northwest Lab., Richland, WA (United States); Rokkan, D.J. [Science Applications International Corp., Richland, WA (United States)

1993-06-01T23:59:59.000Z

380

Radionuclide air emissions report for the Hanford site, Calendar year 1994  

Science Conference Proceedings (OSTI)

This report documents radionuclide air emissions from the Hanford Site in 1994, and the resulting effective dose equivalent to the maximally exposed member of the public, referred to as the ``MEI.`` The report has been prepared and will be submitted in accordance with reporting requirements in the Code of Federal Regulations, title 40, Protection of the Environment, Part 61, ``National Emissions Standards for Hazardous Air Pollutants,`` Subpart H, ``National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.``

Gleckler, B.P.; Diediker, L.P. [Westinghouse Hanford Co., Richland, WA (United States); Jette, S.J.; Rhoads, K.; Soldat, S.K. [Pacific Northwest Lab., Richland, WA (United States)

1995-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Niagara Falls Storage Site environmental report for calendar year 1989, Lewiston, New York  

SciTech Connect

The environmental monitoring program, which began in 1981, was continued during 1989 at the Niagara Falls Storage Site (NFSS), a United States Department of Energy (DOE) surplus facility located in Niagara County, New York, that is currently used for interim storage of radioactive residues, contaminated soils, and rubble. The monitoring program is being conducted by Bechtel National, Inc. The monitoring program at NFSS measures radon concentrations in air; external gamma radiation levels; and uranium and radium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. To verify that the site is in compliance with the DOE radiation protection standard and to assess its potential effect on public health, the radiation dose was calculated for a hypothetical maximally exposed individual. Based on the conservative scenario described in this report, this hypothetical individual receives an annual external exposure equivalent to approximately 2 percent of the DOE radiation protection standard of 100 mrem/yr. This exposure is less than a person receives during a one-way flight from New York to Los Angeles (because of the greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of NFSS that results from radioactive materials present at the site is indistinguishable from the dose that the same population receives from naturally occurring radioactive sources. Results of the 1989 monitoring show that NFSS is in compliance with applicable DOE radiation protection standards. 18 refs., 26 figs., 18 tabs.

Not Available

1990-05-01T23:59:59.000Z

382

Radionuclide Air Emissions Report for the Hanford Site Calendar year 1998  

SciTech Connect

This report documents radionuclide air emissions from the Hanford Site in I998 and the resulting effective dose equivalent to the maximally exposed individual (MEI) member of the public. The report has been prepared in accordance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (40 CFR SI), Subpart H, ''National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities,'' and with the Washington Administrative Code Chapter 246-247, Radiation Protection--Air Emissions. The federal regulations in 40 CFR 61, Subpart H; require the measurement and reporting of radionuclides emitted from Department of Energy facilities and the resulting offsite dose from those emissions. A standard of 10 mrem/yr effective dose equivalent (EDE) is imposed on them. The EDE to the MEI due to routine emissions in 1998 from Hanford Site point sources was 1.3 E-02 mrem (1.3 E-04 mSv), which is 0.13 percent of the federal standard. Chapter 246-247 of the Washington Administrative Code (WAC) requires the reporting of radionuclide emissions from all Department of Energy Hanford Site sources. The state has adopted into these regulations the 40 CFR 61 standard of 10 mrem/yr EDE. The EDE to the MEI attributable to diffuse and fugitive radionuclide air emissions from the Hanford Site in 1998 was 2.5 E-02 mrem (2.5 E-04 mSv). This dose added to the dose from point sources gives a total for all sources of 3.8 E-02 mrem/yr (3.8 E-04 mSv) EDE, which is 0.38 percent of the 10 mrem/yr standard. An unplanned release on August 26, 1998, in the 300 Area of the Hanford Site resulted in a potential dose of 4.1 E-02 mrem to a hypothetical individual at the nearest point of public access to that area. This hypothetical individual was not the MEI since the wind direction on the day of the release was away from the MEI residence. The potential dose from the unplanned event was similar in magnitude to that from routine releases during 1998. Were the release from this unplanned event combined with routine releases, the total dose would be less than 1 percent ofthe 10 mrem/yr standard.

DIEDIKER, L.P.

1999-06-15T23:59:59.000Z

383

Closure report for CAU 339: Area 12 Fleet Operations steam-cleaning discharge area, Nevada Test Site  

SciTech Connect

This Closure Report (CR) provides documentation of the completed corrective action at the Area 12 Fleet Operations site located in the southeast portion of the Area 12 Camp at the Nevada Test Site (NTS). Field work was performed in July 1997 as outlined in the Corrective Action Plan (CAP). The CAP was approved by the Nevada Division of Environmental Protection (NDEP) in June 1997. This site is identified in the Federal Facility Agreement and Consent Order (FFACO) as Corrective Action Site (CAS) Number 12-19-01 and is the only CAS in Corrective Action Unit (CAU) 339. The former Area 12 Fleet Operations Building 12-16 functioned as a maintenance facility for light- and heavy-duty vehicles from approximately 1965 to January 1993. Services performed at the site included steam-cleaning, tire service, and preventative maintenance on vehicles and equipment. Past activities impacted the former steam-cleaning discharge area with volatile organic compounds (VOCs) and total petroleum hydrocarbons (TPH) as oil.

NONE

1997-12-01T23:59:59.000Z

384

Radionuclide air emission report for the Hanford Site Calendar Year 1993  

SciTech Connect

This report documents radionuclide air emissions from the Hanford Site in 1993 and the resulting effective dose equivalent to any member of the public. The report has been prepared and will be submitted in accordance with reporting requirements in the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, {open_quotes}National Emissions Standards for Hazardous Air Pollutants,{close_quotes} Subpart H, {open_quotes}National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.{close_quotes}

Diediker, L.P.; Curn, B.L. [Westinghouse Hanford Co., Richland, WA (United States); Rhoads, K.; Damberg, E.G.; Soldat, J.K.; Jette, S.J. [Pacific Northwest Lab., Richland, WA (United States)

1994-08-01T23:59:59.000Z

385

SITE  

Office of Legacy Management (LM)

-@-Y? ALTERNATE -@-Y? ALTERNATE NfiME: --___---------------___________________N~ME:---------------------- CITY- - .---------------^---------- STATE: wz ------ OWNER(S) -------- Past: Current: ------------------------ _~~--___~~-----_~~----~~-- Owner contacted [3 yes 0 no; if yes, date contacted ------------- TYPE OF ' OPERATION ____-------~----- q Research & Development !zl Facility Type 0 Production scale testing 0 Manufactuiinq 0 Pilot Scale [7 University 0 Bench Scale Process 0 Research Organization 0 Theoretical Studies 0 Government Sponsored Faci 1 i ty 0 Sample & Analysis Cl Other ---_-~~----_~~---~-~ 0 Production 0 Disposal/Storage TYPE OF CONTRACT -_---------~~~~~ q Prime q Subcontract& 0 Purchase Order 0 Other information (i.e., c&t

386

The Federal Energy Technology Center annual site environmental report for calendar year 1998  

SciTech Connect

A comprehensive Directives Program aimed at environmental, safety, and health requirements and risks was initiated in 1997 and will be completed in late 1999 or early 2000. The primary objective of the program is to identify or develop a set of standards that, when implemented, provides reasonable assurance that the health and safety of the workers, public, and the environment will be protected during the performance of the work. In conjunction with the Directives Program, the use of the voluntary environmental management system, ISO 14000, was evaluated. This includes the only environmental management standard to which an entity can be registered. Plans are to consider the specifications and guidance from this standard in the identification of an effective environmental management system for the merged FETC sites. A performance measurement system continued to be maintained during 1998 to assist in evaluating how effectively activities at FETC meet mission-critical goals and how well missions and strategies are connected in the DOE strategic plan. This system also provides data to assist in gauging performance against the DOE critical success factors, that is, performance against technical objectives. Various environmental milestones can be tracked to completion, thus giving the FETC measures by which to gauge the site's goals of remaining in regulatory compliance and achieving best-in-class environmental performance.

NONE

1999-10-31T23:59:59.000Z

387

Argonne National Laboratory summary site environmental report for calendar year 2006.  

Science Conference Proceedings (OSTI)

This booklet is designed to inform the public about what Argonne National Laboratory is doing to monitor its environment and to protect its employees and neighbors from any adverse environmental impacts from Argonne research. The Downers Grove South Biology II class was selected to write this booklet, which summarizes Argonne's environmental monitoring programs for 2006. Writing this booklet also satisfies the Illinois State Education Standard, which requires that students need to know and apply scientific concepts to graduate from high school. This project not only provides information to the public, it will help students become better learners. The Biology II class was assigned to condense Argonne's 300-page, highly technical Site Environmental Report into a 16-page plain-English booklet. The site assessment relates to the class because the primary focus of the Biology II class is ecology and the environment. Students developed better learning skills by working together cooperatively, writing and researching more effectively. Students used the Argonne Site Environmental Report, the Internet, text books and information from Argonne scientists to help with their research on their topics. The topics covered in this booklet are the history of Argonne, groundwater, habitat management, air quality, Argonne research, Argonne's environmental non-radiological program, radiation, and compliance. The students first had to read and discuss the Site Environmental Report and then assign topics to focus on. Dr. Norbert Golchert and Mr. David Baurac, both from Argonne, came into the class to help teach the topics more in depth. The class then prepared drafts and wrote a final copy. Ashley Vizek, a student in the Biology class stated, 'I reviewed my material and read it over and over. I then took time to plan my paper out and think about what I wanted to write about, put it into foundation questions and started to write my paper. I rewrote and revised so I think the amount of time that I put into the project will be worth it in the end because it is a cool thing to be a published writer'. While most students agree that putting the final paper together was the toughest part, the final result was worth the hard work. Christine Beuhler states, 'The time and effort was worth it because I learned a lot about the Argonne facility. This project also improved my analyzing, reading, and writing skills'. Emily Schimick and Kaitlin Hernandez agreed that the feeling of accomplishment when they finished the paper was their favorite part, while the reading of the Argonne Site Environmental Report was their least favorite because it was difficult to understand. The Downers Grove South Biology II class would like to thank our teacher Mr. Scott Howard, as well as Dr. Golchert and Mr. Baurac for their investment in time and energy in helping with the project. Dr. Golchert and Mr. Baurac gave us valuable assistance in the preparation of this project, and we owe them our deepest gratitude. Their real-life experience at Argonne was inspirational. Mr. Howard set the goals and made the commitment to our class to complete this project. Without their kind support, this project would not have been possible.

Golchert, N. W.; ESH /QA Oversight

2008-03-27T23:59:59.000Z

388

Environmental Assessment for the Construction, Operation, and Closure of the Burma Road II Borrow Pit at the Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction, Operation, and Closure of the Construction, Operation, and Closure of the Burma Road II Borrow Pit at the Savannah River Site Agency: U.S. Department of Energy Action: Finding of No Significant Impact Summary: The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1501) to analyze the potential environmental impacts of a new borrow pit, and its alternatives, at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that this action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not

389

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Paducah DUF 6 DEIS: December 2003 SUMMARY S.1 INTRODUCTION This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF 6 ) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF 6 stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the Federal Register (FR) on September 18, 2001 (Federal Register, Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF 6 conversion facilities at Portsmouth,

390

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1998  

Science Conference Proceedings (OSTI)

The results of the 1998 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the US Department of Energy and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are added to the environment as a result of PPPL's operations. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 1998. One significant initiative is the Integrated Safety Management (ISM) program that embraces environment, safety, and health principles as one.

V. Finley

2000-03-06T23:59:59.000Z

391

POST CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 92: AREA 6 DECON POND FACILITY, NEVADA TEST SITE, NEVADA; FOR CALENDAR YEAR 2005  

SciTech Connect

This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility, Nevada Test Site, Nevada. CAU 92 was closed in accordance with the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection (NDEP), 1995) and the Federal Facility Agreement and Consent Order of 1996. Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by the NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs): CAS 06-04-01, Decon Pad Oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in]) in a 24-hour period. This report covers calendar year 2005. Quarterly site inspections were performed in March, June, September, and December of 2005. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A. Five additional inspections were performed after precipitation events that exceeded 1.28 cm (0.50 in) within a 24-hour period during 2005. No significant changes in site conditions were noted during these inspections, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A. Precipitation records for 2005 are included in Appendix C.

NA

2006-03-01T23:59:59.000Z

392

Audit of Departmental Integrated Standardized Core Accounting System (DISCAS) Operations at Selected Field Sites, AP-FS-97-02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF DEPARTMENTAL INTEGRATED STANDARDIZED CORE ACCOUNTING SYSTEM (DISCAS) OPERATIONS AT SELECTED FIELD SITES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov

393

Radionuclide air emissions report for the Hanford site calendar year 1995  

SciTech Connect

This report documents radionuclide air emissions from the Hanford Site in 1995, and the resulting effective dose equivalent (FDE) to the maximally exposed member of the public, referred to as the `MEI.` The report has been prepared and will be submitted in accordance with reporting requirements in the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, `National Emissions Standards for Hazardous Air Pollutants,` Subpart H, `National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.` This report has also been prepared for and will be submitted in accordance with the reporting requirements of the Washington Administrative Code Chapter 246-247, `Radiation Protection-Air Emissions.`

Gleckler, B.P., Westinghouse Hanford

1996-06-26T23:59:59.000Z

394

Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993  

SciTech Connect

The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

1993-03-01T23:59:59.000Z

395

Idaho National Engineering Laboratory Site environmental report for Calendar Year 1994  

Science Conference Proceedings (OSTI)

This report presents a compilation of data collected in 1994 for routine environmental surveillance programs conducted on and around INEL. EG&G conducted the onsite surveillance program January-- September; Lockheed Idaho conducted the program October--December. The offsite surveillance program was conducted by the Environmental Science and Research Foundation. Ground water monitoring (both on and off site) was performed by USGS. This report presents summaries of facility effluent monitoring data collected by INEL contractors. It includes collection of foodstuffs at the INEL boundary and distant offsite locations, and the collection of air and water samples at onsite locations and offsite boundary and distant locations. The report also compares and evaluates the sample results to federal regulations and standards.

Mitchell, R.G.; Peterson, D. [Environmental Science and Research Foundation, Idaho Falls, ID (United States); Hoff, D.L. [USDOE Idaho Operations Office, Idaho Falls, ID (United States)

1995-07-01T23:59:59.000Z

396

Two Years of Operational Comprehensive Hydrostatic Quality Control at the National Meteorological Center  

Science Conference Proceedings (OSTI)

A comprehensive hydrostatic quality control (CHQC) procedure for rawinsonde heights and temperatures was implemented into operational use at the National Meteorological Center (NMC) in December 1988. The CHQC uses a sophisticated decision-making ...

Lev S. Gandin; Lauren L. Morone; William G. Collins

1993-03-01T23:59:59.000Z

397

One-Year Operational Measurements with a Sonic AnemometerThermometer and a Doppler Sodar  

Science Conference Proceedings (OSTI)

A Doppler sodar and an ultrasonic anemometerthermometer, which are operated continuously at a nuclear research center in Germany, are described. Mean values and second moments including turbulent surface fluxes recorded over 1 yr are analyzed in ...

Gerhard Peters; Bernd Fischer; Hans Jrgen Kirtzel

1998-02-01T23:59:59.000Z

398

Model Output Statistics Forecasts: Three Years of Operational Experience in the Netherlands  

Science Conference Proceedings (OSTI)

In the Netherlands, one to five day Model Output Statistics (MOS) forecasts have been used operationally since November 1983. The weather elements predicted are the probability of precipitation, the conditional probability of frozen precipitation,...

C. Lemcke; S. Kruizinga

1988-05-01T23:59:59.000Z

399

YEAR  

National Nuclear Security Administration (NNSA)

1 1 YEAR 2011 Males 18 Females 23 YEAR 2011 SES 2 EJ/EK 2 NQ (Prof/Tech/Admin) 35 NU (Tech/Admin Support) 2 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 9 Asian Male 0 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 12 White Female 6 DIVERSITY Workforce Diversity Associate Administrator for Information Management & Chief Information Officer, NA-IM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 18 43.9% 23 56.1% Gender Males Females 4.9% 4.9% 85.4% 4.9% Pay Plan SES EJ/EK NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 2.4% 4.9% 7.3% 22.0% 0.0% 0.0% 4.9% 14.6% 29.3% 14.6% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

400

YEAR  

National Nuclear Security Administration (NNSA)

4 4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 31 NU (Tech/Admin Support) 5 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 10 White Male 13 White Female 10 DIVERSITY Workforce Diversity Office of General Counsel, NA-GC As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 21 47.7% 23 52.3% Gender Males Females 6.8% 2.3% 2.3% 6.8% 70.5% 11.4% Pay Plan SES EJ/EK EN 03 NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.0% 0.0% 2.3% 4.5% 2.3% 2.3% 13.6% 22.7% 29.5% 22.7% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

Note: This page contains sample records for the topic "year site operations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.