  1. EM Five-Year Plan (FY2008 - FY2012)

    Broader source: Energy.gov (indexed) [DOE]

    ...150 Lawrence Berkeley National Laboratory (LBNL) is not included in DOE-EM Five Year Plan FY 2008 - FY 2012. LBNL site is expected to...

  2. National Renewable Energy Laboratory 10 Year Site Plan FY 2007...

    Broader source: Energy.gov (indexed) [DOE]

    National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 More Documents & Publications Facilities and Infrastructure Program FY 2016 Budget At-A-Glance EA-1440-S1:...

  3. FY 1987 current fiscal year work plan

    SciTech Connect (OSTI)

    Not Available

    1986-12-01T23:59:59.000Z

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

  4. Twenty-Five Year Site Plan FY2013 - FY2037

    SciTech Connect (OSTI)

    Jones, William H. [Los Alamos National Laboratory

    2012-07-12T23:59:59.000Z

    Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.

  5. EMERGENCY READINESS ASSURANCE PLAN (ERAP) FOR FISCAL YEAR (FY) 2014

    SciTech Connect (OSTI)

    Bush, Shane

    2014-09-01T23:59:59.000Z

    This Emergency Readiness Assurance Plan (ERAP) for Fiscal Year (FY) 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for FY-15. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.

  6. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  7. Department of Energy Five Year Plans, FY2007-2011 and FY2008-FY2012

    Broader source: Energy.gov [DOE]

    The purpose of the EM Five Year Plans was to describe EM's planned strategies, funding and accomplishments over a five year span.

  8. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    SciTech Connect (OSTI)

    NONE

    1998-03-01T23:59:59.000Z

    Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.

  9. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-10-01T23:59:59.000Z

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  10. FY 2013 Major Capital Outlay Project Request and Five-Year Comprehensive Master Plan

    E-Print Network [OSTI]

    in the following specific areas: Transmission & Distribution (smart grids technology, cyber-security) GenerationFY 2013 Major Capital Outlay Project Request and Five-Year Comprehensive Master Plan September 2011 ____ No _X__ Is There a Five-Year Capital Outlay Plan Available? Yes _X__ No ____ Are Professionally

  11. Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

  12. LDRD FY 2014 Program Plan

    SciTech Connect (OSTI)

    Anita Gianotto; Dena Tomchak

    2013-08-01T23:59:59.000Z

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  13. Sustainable NREL - Site Sustainability Plan FY 2015 (Management Publication)

    SciTech Connect (OSTI)

    Not Available

    2015-01-01T23:59:59.000Z

    NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

  14. FY 2014-2024 Ten Year Site Plan Preparation Guidance | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007FY 2014 Solid Oxide Fuel

  15. Hanford environmental management program multi-year work plan FY1998

    SciTech Connect (OSTI)

    Giese, K.A.

    1997-08-25T23:59:59.000Z

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year`s work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ``Work Authorization`` identifies the impacted scope and requires the Contracting Officer`s or Assistant Manager-Contracting Officer`s Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ``Project Summary Section`` and Section Two is titled the ``Additional Sections at the Project Baseline Summaries Level``. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS {number_sign} RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP, exclusive of the other programs under the Mission Support PBS. This MYWP thus has a Section One that speaks to two programs, and two Section Two`s, one each for HEMP and EEM.

  16. Geothermal Energy Multi-Year Program Plan, FY 1993-1997

    SciTech Connect (OSTI)

    None

    1992-03-01T23:59:59.000Z

    This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form. (DJE 2005)

  17. Combined Fiscal Year (FY) 2002 Annual Performance Report and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY 2003 Annual Performance Plan More Documents & Publications Annual Performance Plan: IG-APP-005 DOE OIG Strategic Plan Fiscal Years 2003-2008 DOE OIG Strategic Plan Fiscal...

  18. FY 1996 annual work plan

    SciTech Connect (OSTI)

    NONE

    1995-09-30T23:59:59.000Z

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  19. Strategic Plan FY14-FY18

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary900Steep SlopeStochasticPlan FY14-FY18 Exceptional service in

  20. FY 2015 Ten Year Site Plan-Limited Update Los Alamos National...

    National Nuclear Security Administration (NNSA)

    goals, the Laboratory will pursue a combination of additional investments in renewable energy, green construction practices, and operational improvements for energy FY 2015 Ten...

  1. FY95 software project management plan: TMACS, CASS computer systems

    SciTech Connect (OSTI)

    Spurling, D.G.

    1994-11-11T23:59:59.000Z

    The FY95 Work Plan for TMACS and CASS Software Projects describes the activities planned for the current fiscal year. This plan replaces WHC-SD-WM-SDP-008. The TMACS project schedule is included in the TWRS Integrated Schedule.

  2. Chief Financial Officer FY 1997 status report and five-year plan

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    The Chief Financial Officers Act of 1990 (CFO Act) establishes the legal framework for improved Federal financial management. The Act requires the agency CFO to prepare, and annually revise, a plan to implement the Office of Management and Budget (OMB) Federal Financial Management Status Report and Five-Year Plan. This is the sixth Status Report and Five-Year Plan submission to OMB by the Department of Energy (DOE). Financial management at the Department operates in an environment of Government-wide efforts to improve financial management and implements legislation and administrative provisions which stress the need for change. This report sets forth the Department`s plans for financial management improvements in the coming years. It also highlights several new initiatives completed or currently underway that will significantly improve the overall effectiveness of financial management at the Department of Energy.

  3. Annual Performance Report FY 2004 Annual Performance Plan FY...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOEIG-APP-007 Annual Performance Report FY 2004 Annual Performance Plan FY 2005, DOEIG-APP-007 I am pleased to present the Office of Inspector General's (OIG's) combined...

  4. JIMAR ANNUAL REPORT FOR FY 2008 Plans for the Next Year

    E-Print Network [OSTI]

    the UHDAS systems on the Hi'ialakai and the Ka'imimoana. Penetration of Anthropogenic CO2 in the Oceans NOAA funding of the Hawaii Ocean Observing and Information System (HI-OOIS) in FY08, we are beginning

  5. Institutional Plan FY 2003 - 2007

    SciTech Connect (OSTI)

    Chartock, Michael; Hansen, Todd

    2003-01-27T23:59:59.000Z

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the Laboratory Scientific Vision and operations goals. The Initiatives section describes some of the specific new research programs representing major long-term opportunities for the Department of Energy and Berkeley Lab. The Operations Strategic Planning section describes our strategic thinking in the areas of human resources; site and cyber security; workforce diversity; communications and trust; integrated safety management; and technology transfer activities. The Infrastructure Strategic Planning section describes Berkeley Lab's facilities planning process and our site and facility needs. The Summary of Major Issues section provides context for discussions at the Institutional Planning On-Site Review. The Resource Projections are estimates of required budgetary authority for Berkeley Lab's research programs.

  6. HAMMER FY 1996 Multi-Year Program Plan: WBS {number_sign}8.2

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The Hazardous Material Management and Emergency Response Training and Education Center -- known simply as HAMMER -- is being developed to assist the US Department of Energy (DOE) and others dedicated to improving worker health, safety and productivity. HAMMER is a training and education program for hazardous material, waste management, and emergency response workers. HAMMER is managed by the DOE Richland Operations Office under Work Breakdown Structure (8.2). The 1996 Multi-Year Program Plan (MYPP) includes the Execution Year data and provides the information for Programmatic Fiscal Year Site Management System Execution Baseline, as well as the detailed work plan for performance evaluation of the authorized work. The MYPP incorporates various planning methodologies to define the program and provides essential program integration, and a fully developed technical, cost, and schedule baseline. The MYPP will be utilized by WHC Program and Department Managers as the baseline management tool for status and progress monitoring, performance enhancement, impact analysis studies, and as the basis for detailed fiscal year and near-term planning.

  7. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    SciTech Connect (OSTI)

    Moore, D.A.

    1994-09-01T23:59:59.000Z

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan.

  8. Institutional plan. FY 1997-2002

    SciTech Connect (OSTI)

    NONE

    1996-06-01T23:59:59.000Z

    The FY 1997-2002 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. Of particular significance this year is the role of computing sciences in supporting a broad range of research activities, at Berkeley Lab in particular and throughout the entire Department of Energy system in general. The Institutional Plan is a management report for integration with the Department of Energy`s mission and programs and is an element of Department of Energy`s strategic management planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives.

  9. FY 1999 annual work plan for infrastructure program WBS 6

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-08-27T23:59:59.000Z

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  10. FY 91 Annual Research Plan

    SciTech Connect (OSTI)

    Not Available

    1990-12-01T23:59:59.000Z

    In line with the Federal Oil Research Program to maximize the economic producibility of the domestic oil resource, the National Institute for Petroleum and Energy Research (NIPER) presents this FY91 Annual Research Plan. NIPER is organized into two research departments -- Energy Production Research (EPR) and Fuels Research (FR). Projects in EPR deal with various aspects of enhanced oil recovery and include reservoir characterization, chemical flooding, gas injection, steam injection, microbial enhanced oil recovery, and the environmental concerns related to these processes. Projects in FR consider the impact of heavy oil and alternative fuels on the processing and end-use of fuels. Projects are briefly described.

  11. Institutional plan FY 1998--FY 2003

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    The Institutional Plan has been rearranged this year as a reflection of new Department of Energy (DOE) guidelines and to better illustrate the Laboratory`s mission-oriented focus. In Section 1 of this plan, the authors set forth their vision, mission, core competencies, strategic view, and related material. This section illustrates integration with the vision, mission, priorities, and core businesses of DOE. They define strategies, tactics, and guidelines and describe how they measure progress. In Section 2, they have elaborated on how they plan to address the Laboratory`s mission, describing programs and activities in the context of their role in this mission. Section 3 contains information on their approach to managing their business and operations. First they address the most critical issue safety. In this section, they confirm that Los Alamos is addressing the DOE critical success factors and describe the initiatives and plans that make their mission successful and leads them toward their vision. Section 4 contains details of their resources. 44 figs., 56 tabs.

  12. Strategic Plan FY14-FY18

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    infrastructure, and offset projected increases in pension contributions and employee health care insurance, Sandia closed new enrollment into the pension plan, changed the...

  13. Five-Year Implementation Plan For Advanced Separations and Waste Forms Capabilities at the Idaho National Laboratory (FY 2011 to FY 2015)

    SciTech Connect (OSTI)

    Not Listed

    2011-03-01T23:59:59.000Z

    DOE-NE separations research is focused today on developing a science-based understanding that builds on historical research and focuses on combining a fundamental understanding of separations and waste forms processes with small-scale experimentation coupled with modeling and simulation. The result of this approach is the development of a predictive capability that supports evaluation of separations and waste forms technologies. The specific suite of technologies explored will depend on and must be integrated with the fuel development effort, as well as an understanding of potential waste form requirements. This five-year implementation plan lays out the specific near-term tactical investments in people, equipment and facilities, and customer capture efforts that will be required over the next five years to quickly and safely bring on line the capabilities needed to support the science-based goals and objectives of INL’s Advanced Separations and Waste Forms RD&D Capabilities Strategic Plan.

  14. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30T23:59:59.000Z

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  15. Economic transition FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 7.4.9

    SciTech Connect (OSTI)

    Schwenk, R.M.

    1994-09-01T23:59:59.000Z

    The mission of the WHC Economic Transition Center is to support Hanford`s cleanup mission and to leverage the assets of that mission to promote diversification and long-term sustainability of the regional economy and workforce. Conducting an economic transition program is imperative at sites such as Hanford, which are faced with transition from a defense production mission to a massive cleanup mission, followed by rampdown and site closure. At issue are the human and physical resources of the Site and the final disposition of those resources. Without an effective economic transition program, the federal government will have invested billions of dollars to achieve environmental regulatory compliance without generating any greater return on investment. With an effective economic transition program, the potential exists to redeploy the highly skilled, well-trained, and educated workforce developed and utilized during the Site`s cleanup mission and find productive uses for land, facilities, and equipment. The Economic Transition Center has been divided into the following business areas: outsourcing; spinoffs; technology acquisition; technology transfer; conversion; and cross-cutting partnerships. A work package has been developed for each of these business areas in this Fiscal Year Work Plan.

  16. Page 1 of 1 PSD FY 2014 ESH IMPROVEMENT PLAN

    E-Print Network [OSTI]

    Ohta, Shigemi

    Page 1 of 1 PSD FY 2014 ESH IMPROVEMENT PLAN PREPARED BY ANDREW ACKERMAN This document defines the actions planned for FY 2014 for improving the PSD ESH programs beyond the primary goal of controlling

  17. Institutional Plan FY 2003 - 2007

    E-Print Network [OSTI]

    Chartock, Michael; Hansen, Todd

    2002-01-01T23:59:59.000Z

    BA) FY01 DOE Effort CRADA WFO Total Operating CapitalWork for Other than DOE CRADA TOTAL DIRECT TOTAL INDIRECTOthers--Non-DOE Direct FTE CRADA Direct FTE TOTAL LAB DIRECT

  18. Spent nuclear fuels project: FY 1995 multi-year program plan, WBS {number_sign}1.4

    SciTech Connect (OSTI)

    Denning, J.L.

    1994-09-01T23:59:59.000Z

    The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan.

  19. Transition projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1. Volume 4

    SciTech Connect (OSTI)

    Cartmell, D.B.

    1994-09-01T23:59:59.000Z

    This reference contains information about the deactivation of the Purex Process Plant located on the Hanford Reservation. This document consists of a tabular schedule of events covering the next three years.

  20. FY 2015 Ten Year Site Plan-Limited Update Los Alamos National Laboratory LA-UR-14-22957 1

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTubahq.na.gov Office ofDepartment ofr EEONuclear NEWS MEDIA CONTACT: FOR5FY

  1. FY 2011 Service Contract Inventory Analysis Plan

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State71Laboratory1

  2. FY 2015 Argonne Site Sustainability Plan | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY 2015 Argonne Site Sustainability Plan Argonne National Laboratory is committed to reducing its environmental footprint. Our site sustainability goals are in line with U.S....

  3. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    SciTech Connect (OSTI)

    Not Available

    1994-11-01T23:59:59.000Z

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  4. Spent Nuclear Fuel Project FY 1996 Multi-Year Program Plan WBS No. 1.4.1, Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    This document describes the Spent Nuclear Fuel (SNF) Project portion of the Hanford Strategic Plan for the Hanford Reservation in Richland, Washington. The SNF Project was established to evaluate and integrate the urgent risks associated with N-reactor fuel currently stored at the Hanford site in the K Basins, and to manage the transfer and disposition of other spent nuclear fuels currently stored on the Hanford site. An evaluation of alternatives for the expedited removal of spent fuels from the K Basin area was performed. Based on this study, a Recommended Path Forward for the K Basins was developed and proposed to the U.S. DOE.

  5. Plasma Chamber and APEX Budget Plans for FY 2000 (and FY 2001)

    E-Print Network [OSTI]

    Abdou, Mohamed

    Plasma Chamber and APEX Budget Plans for FY 2000 (and FY 2001) Spokesperson: Mohamed Abdou OFES: Plasma Chamber Spokesperson: M. Abdou Part I: VLT Director's Proposed Budget: $2200K Task Description Plans and Budgets Technology Area: APEX Spokesperson: M. Abdou Part I: VLT Director's Proposed Budget

  6. Institutional Plan FY 2001-2005

    SciTech Connect (OSTI)

    Chartock, Michael; Hansen, Todd, editors

    2000-07-01T23:59:59.000Z

    The FY 2001-2005 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  7. Nuclear Waste Technical Review Board Strategic Plan FY 20082013

    E-Print Network [OSTI]

    169 Appendix F Nuclear Waste Technical Review Board Strategic Plan FY 2008­2013 #12;#12;Appendix F 171 Nuclear Waste Technical Review Board Strategic Plan FY 2008­2013 suMMary sTaTeMenT of The Board T he Nuclear Waste Policy Amendments Act (NWPAA) of 1987 directed the U.S. Department of Energy (DOE

  8. Oak Ridge National Laboratory institutional plan, FY 1996--FY 2001

    SciTech Connect (OSTI)

    NONE

    1995-12-01T23:59:59.000Z

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years. Included in the report are: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory strategic plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; resource projections; appendix which contains data for site and facilities, user facility, science and mathematic education and human resources; and laboratory organization chart.

  9. FY 2012 Service Contract Inventory Analysis Plan

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And2 Federal Office52

  10. Advanced reactors transition fiscal year 1996 multi-year program plan WBS 7.3

    SciTech Connect (OSTI)

    Hulvey, R.K.

    1995-09-21T23:59:59.000Z

    This document describes in detail the work to be accomplished in FY 1996 and the out years for the Advanced Reactors Transition (WBS 7.3. ). This document describes specific milestones and funding profiles. Based upon the Fiscal Year 1996 Multi-Year Program Plan (MYPP), DOE will provide authorization to perform the work outlined in the FY 1996 MYPP

  11. The PNNL Lab Homes Experimental Plan, FY12?FY15

    SciTech Connect (OSTI)

    Widder, Sarah H.; Parker, Graham B.; Baechler, Michael C.

    2012-05-30T23:59:59.000Z

    The PNNL lab homes (http://labhomes.pnnl.gov/ ) are two manufactured homes recently installed immediately south of the 6th Street Warehouse on the PNNL Richland, WA campus that will serve as a project test bed for DOE, PNNL and its research partners who aim to achieve highly energy efficient and grid-responsive homes. The PNNL Lab Homes project is the first of its kind in the Pacific Northwest region. The Energy & Environment Directorate at PNNL, working with multiple sponsors, will use the identical 1,500 square-foot homes for experiments focused on reducing energy use and peak demand. Research and demonstration primarily will focus on retrofit technologies, and the homes will offer a unique, side-by-side ability to test and compare new ideas and approaches that are applicable to site-built as well as manufactured homes. The test plan has the following objectives: • To define a retrofit solution packages for moderate to cold climates that can be cost effectively deployed in the Pacific NW to save 50% of the energy needs of a typical home while enhancing the comfort and indoor air quality. The retrofit strategies would also lower the peak demands on the grid. • To leverage the unique opportunity in the lab homes to reach out to researchers, industry, and other interested parties in the building science community to collaborate on new smart and efficient solutions for residential retrofits. • To increase PNNL’s visibility in the area of buildings energy efficiency based on the communication strategy and presentation of the unique and impactful data generated in the lab homes. This document describes the proposed test plan for the lab homes to achieve these goals, through FY15. The subsequent sections will provide a brief description of each proposed experiment, summarize the timing of the experiment (including any experiments that may be run in parallel, and propose potential contributors and collaborators. For those experiments with funding information available, it is provided.

  12. Budget Planning Meeting FY 2007 Status of ITER Negotiations

    E-Print Network [OSTI]

    Budget Planning Meeting ­ FY 2007 Status of ITER Negotiations Michael Roberts, Director ITER Preparations of $5M · Using FY05 $5M to continue to get ready for MIE project · Maintaining U.S. visiting experts · Further establishing U.S. ITER Project Office · Fulfilling DOE project management requirements

  13. Sandia National Laboratories Institutional Plan: FY 1999-2004

    SciTech Connect (OSTI)

    Garber, D.P.

    1999-01-06T23:59:59.000Z

    This Institutional Plan is the most comprehensive yearly "snapshot" available of Sandia National Laboratories' major programs, facilities, human resources, and budget. The document also includes overviews of our missions, organization, capabilities, planning functions, milestones, and accomplishments. The document's purpose is to provide the above information to the US Department of Energy, key congressional committees, Sandia management, and other present and potential customers. Chapter 2 presents information about Sandia's mission and summarizes our recent revision of Sandia's Strategic Plan. Chapter 3 presents an overview of Sandia's strategic objectives, chapter 4 lists laboratory goals and milestones for FY 1999, and chapter 5 presents our accomplishments during FY 1998. Chapters 3 through 5 are organized around our eight strategic objectives. The four primary objectives cover nuclear weapons responsibilities, nonproliferation and materials control, energy and critical infrastructures, and emerging national security threats. The major programmatic initiatives are presented in chapter 7. However, the programmatic descriptions in chapter 6 and the Associated funding tables in chapter 9 continue to be presented by DOE Budget and Reporting Code, as in previous Sandia institutional plans. As an aid to the reader, the four primary strategic objectives in chapter 3 are cross-referenced to the program information in chapter 6.

  14. Pacific Northwest National Laboratory Institutional Plan FY 2004-2008

    SciTech Connect (OSTI)

    Quadrel, Marilyn J.

    2004-04-15T23:59:59.000Z

    This Institutional Plan for FY 2004-2008 is the principal annual planning document submitted to the Department of Energy's Office of Science by Pacific Northwest National Laboratory in Richland, Washington. This plan describes the Laboratory's mission, roles, and technical capabilities in support of Department of Energy priorities, missions, and plans. It also describes the Laboratory strategic plan, key planning assumptions, major research initiatives, and program strategy for fundamental science, energy resources, environmental quality, and national security.

  15. High performance computing and communications: FY 1997 implementation plan

    SciTech Connect (OSTI)

    NONE

    1996-12-01T23:59:59.000Z

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  16. Cementitious Barriers Partnership FY2013 End-Year Report

    SciTech Connect (OSTI)

    Flach, G. P. [Savannah River Site (SRS), Aiken, SC (United States); Langton, C. A. [Savannah River Site (SRS), Aiken, SC (United States); Burns, H. H. [Savannah River Site (SRS), Aiken, SC (United States); Smith, F. G. [Savannah River Site (SRS), Aiken, SC (United States); Kosson, D. S. [Vanderbilt University, School of Engineering, Nashville, TN (United States); Brown, K. G. [Vanderbilt University, School of Engineering, Nashville, TN (United States); Samson, E. [SIMCO Technologies, Inc., Quebec (Canada); Meeussen, J. C.L. [Nuclear Research and Consultancy Group (NRG), Petten (The Netherlands); van der Sloot, H. A. [Hans van der Sloot Consultancy, Langedijk (The Netherlands); Garboczi, E. J. [Materials & Construction Research Division, National Institute of Standards and Technology, Gaithersburg, MD (United States)

    2013-11-01T23:59:59.000Z

    In FY2013, the Cementitious Barriers Partnership (CBP) demonstrated continued tangible progress toward fulfilling the objective of developing a set of software tools to improve understanding and prediction of the long?term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. In November 2012, the CBP released “Version 1.0” of the CBP Software Toolbox, a suite of software for simulating reactive transport in cementitious materials and important degradation phenomena. In addition, the CBP completed development of new software for the “Version 2.0” Toolbox to be released in early FY2014 and demonstrated use of the Version 1.0 Toolbox on DOE applications. The current primary software components in both Versions 1.0 and 2.0 are LeachXS/ORCHESTRA, STADIUM, and a GoldSim interface for probabilistic analysis of selected degradation scenarios. The CBP Software Toolbox Version 1.0 supports analysis of external sulfate attack (including damage mechanics), carbonation, and primary constituent leaching. Version 2.0 includes the additional analysis of chloride attack and dual regime flow and contaminant migration in fractured and non?fractured cementitious material. The LeachXS component embodies an extensive material property measurements database along with chemical speciation and reactive mass transport simulation cases with emphasis on leaching of major, trace and radionuclide constituents from cementitious materials used in DOE facilities, such as Saltstone (Savannah River) and Cast Stone (Hanford), tank closure grouts, and barrier concretes. STADIUM focuses on the physical and structural service life of materials and components based on chemical speciation and reactive mass transport of major cement constituents and aggressive species (e.g., chloride, sulfate, etc.). THAMES is a planned future CBP Toolbox component focused on simulation of the microstructure of cementitious materials and calculation of resultant hydraulic and constituent mass transfer parameters needed in modeling. Two CBP software demonstrations were conducted in FY2013, one to support the Saltstone Disposal Facility (SDF) at SRS and the other on a representative Hanford high?level waste tank. The CBP Toolbox demonstration on the SDF provided analysis on the most probable degradation mechanisms to the cementitious vault enclosure caused by sulfate and carbonation ingress. This analysis was documented and resulted in the issuance of a SDF Performance Assessment Special Analysis by Liquid Waste Operations this fiscal year. The two new software tools supporting chloride attack and dual?regime flow will provide additional degradation tools to better evaluate performance of DOE and commercial cementitious barriers. The CBP SRNL experimental program produced two patent applications and field data that will be used in the development and calibration of CBP software tools being developed in FY2014. The CBP software and simulation tools varies from other efforts in that all the tools are based upon specific and relevant experimental research of cementitious materials utilized in DOE applications. The CBP FY2013 program involved continuing research to improve and enhance the simulation tools as well as developing new tools that model other key degradation phenomena not addressed in Version 1.0. Also efforts to continue to verify the various simulation tools through laboratory experiments and analysis of field specimens are ongoing and will continue into FY2014 to quantify and reduce the uncertainty associated with performance assessments. This end?year report summarizes FY2013 software development efforts and the various experimental programs that are providing data for calibration and validation of the CBP developed software.

  17. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation. FY 1993

    SciTech Connect (OSTI)

    Not Available

    1993-01-15T23:59:59.000Z

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94.

  18. NREL's FY09 CSP Resource Assessment Plans: Solar Resource Assessment Workshop

    SciTech Connect (OSTI)

    Renne, D.

    2008-10-29T23:59:59.000Z

    Solar Resource Assessment Workshop, Denver CO, Oct 29, 2008 presentation: NREL's FY09 CSP Resource Assessment Plans

  19. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    SciTech Connect (OSTI)

    Fisk, E.L.

    1994-06-01T23:59:59.000Z

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  20. Argonne National Laboratory institutional plan FY 2001--FY 2006.

    SciTech Connect (OSTI)

    Beggs, S.D.

    2000-12-07T23:59:59.000Z

    This Institutional Plan describes what Argonne management regards as the optimal future development of Laboratory activities. The document outlines the development of both research programs and support operations in the context of the nation's R and D priorities, the missions of the Department of Energy (DOE) and Argonne, and expected resource constraints. The Draft Institutional Plan is the product of many discussions between DOE and Argonne program managers, and it also reflects programmatic priorities developed during Argonne's summer strategic planning process. That process serves additionally to identify new areas of strategic value to DOE and Argonne, to which Laboratory Directed Research and Development funds may be applied. The Draft Plan is provided to the Department before Argonne's On-Site Review. Issuance of the final Institutional Plan in the fall, after further comment and discussion, marks the culmination of the Laboratory's annual planning cycle. Chapter II of this Institutional Plan describes Argonne's missions and roles within the DOE laboratory system, its underlying core competencies in science and technology, and six broad planning objectives whose achievement is considered critical to the future of the Laboratory. Chapter III presents the Laboratory's ''Science and Technology Strategic Plan,'' which summarizes key features of the external environment, presents Argonne's vision, and describes how Argonne's strategic goals and objectives support DOE's four business lines. The balance of Chapter III comprises strategic plans for 23 areas of science and technology at Argonne, grouped according to the four DOE business lines. The Laboratory's 14 major initiatives, presented in Chapter IV, propose important advances in key areas of fundamental science and technology development. The ''Operations and Infrastructure Strategic Plan'' in Chapter V includes strategic plans for human resources; environmental protection, safety, and health; site and facilities; security, export control, and counterintelligence; information management; communications, outreach, and community affairs; performance-based management; and productivity improvement and overhead cost reduction. Finally, Chapter VI provides resource projections that are a reasonable baseline for planning the Laboratory's future.

  1. Institutional plan. FY 1998--2003

    SciTech Connect (OSTI)

    NONE

    1997-07-01T23:59:59.000Z

    This Institutional Plan for Argonne National Laboratory contains central elements of Argonne`s strategic plan. Chapter II of this document discusses the Laboratory`s mission and core competencies. Chapter III presents the Science and Technology Strategic Plan, which summarizes key features of the external environment, presents Argonne`s vision, and describes how the Laboratory`s strategic goals and objectives map onto and support DOE`s four business lines. The balance of the chapter comprises the science and technology area plans, organized by the four DOE business lines. Chapter IV describes the Laboratory`s ten major initiatives, which cover a broad spectrum of science and technology. Our proposal for an Exotic Beam Facility aims at, among other things, increased understanding of the processes of nuclear synthesis during and shortly after the Big Bang. Our Advanced Transportation Technology initiative involves working with US industry to develop cost-effective technologies to improve the fuel efficiency and reduce the emissions of transportation systems. The Laboratory`s plans for the future depend significantly on the success of its major initiatives. Chapter V presents our Operations and Infrastructure Strategic Plan. The main body of the chapter comprises strategic plans for human resources; environmental protection, safety, and health; site and facilities; and information management. The chapter concludes with a discussion of the business and management practices that Argonne is adopting to improve the quality and cost-effectiveness of its operations. The structure and content of this document depart from those of the Institutional Plan in previous years. Emphasis here is on directions for the future; coverage of ongoing activities is less detailed. We hope that this streamlined plan is more direct and accessible.

  2. RISMC ADVANCED SAFETY ANALYSIS WORKING PLANFY 2015 – FY 2019

    SciTech Connect (OSTI)

    Szilard, Ronaldo H; Smith, Curtis L

    2014-09-01T23:59:59.000Z

    SUMMARY In this report, the Advanced Safety Analysis Program (ASAP) objectives and value proposition is described. ASAP focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. The set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. As part of the discussion, we have identified three sets of stakeholders, the nuclear industry, the Department of Energy (DOE), and associated oversight organizations. These three groups would benefit from ASAP in different ways. For example, within the DOE complex, the possible applications that are seen include the safety of experimental reactors, facility life extension, safety-by-design in future generation advanced reactors, and managing security for the storage of nuclear material. This report provides information in five areas: 1. A value proposition (“why is this important?”) that will make the case for stakeholder’s use of the ASAP research and development (R&D) products. 2. An identification of likely end users and pathway to adoption of enhanced tools by the end-users. 3. A proposed set of practical and achievable “use case” demonstrations. 4. A proposed plan to address ASAP verification and validation (V&V) needs. 5. A proposed schedule for the multi-year ASAP.

  3. CEMENTITIOUS BARRIERS PARTNERSHIP FY13 MID-YEAR REPORT

    SciTech Connect (OSTI)

    Burns, H.; Flach, G.; Langton, C.; KOSSON, D.; BROWN, K.; SAMSON, E.; MEEUSSEN, J.; SLOOT, H.; GARBOCZI, E.

    2013-05-01T23:59:59.000Z

    In FY2013, the Cementitious Barriers Partnership (CBP) is continuing in its effort to develop and enhance software tools demonstrating tangible progress toward fulfilling the objective of developing a set of tools to improve understanding and prediction of the long?term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. In FY2012, the CBP released the initial inhouse “Beta?version” of the CBP Software Toolbox, a suite of software for simulating reactive transport in cementitious materials and important degradation phenomena. The current primary software components are LeachXS/ORCHESTRA, STADIUM, and a GoldSim interface for probabilistic analysis of selected degradation scenarios. THAMES is a planned future CBP Toolbox component (FY13/14) focused on simulation of the microstructure of cementitious materials and calculation of resultant hydraulic and constituent mass transfer parameters needed in modeling. This past November, the CBP Software Toolbox Version 1.0 was released that supports analysis of external sulfate attack (including damage mechanics), carbonation, and primary constituent leaching. The LeachXS component embodies an extensive material property measurements database along with chemical speciation and reactive mass transport simulation cases with emphasis on leaching of major, trace and radionuclide constituents from cementitious materials used in DOE facilities, such as Saltstone (Savannah River) and Cast Stone (Hanford), tank closure grouts, and barrier concretes. STADIUM focuses on the physical and structural service life of materials and components based on chemical speciation and reactive mass transport of major cement constituents and aggressive species (e.g., chloride, sulfate, etc.). The CBP issued numerous reports and other documentation that accompanied the “Version 1.0” release including a CBP Software Toolbox User Guide and Installation Guide. These documents, as well as, the presentations from the CBP Software Toolbox Demonstration and User Workshop, which are briefly described below, can be accessed from the CBP webpage at http://cementbarriers.org/. The website was recently modified to describe the CBP Software Toolbox and includes an interest form for application to use the software. The CBP FY13 program is continuing research to improve and enhance the simulation tools as well as develop new tools that model other key degradation phenomena not addressed in Version 1.0. Also efforts to continue to verify the various simulation tools thru laboratory experiments and analysis of field specimens are ongoing to quantify and reduce the uncertainty associated with performance assessments are ongoing. This mid?year report also includes both a summary on the FY13 software accomplishments in addition to the release of Version 1.0 of the CBP Software Toolbox and the various experimental programs that are providing data for calibration and validation of the CBP developed software. The focus this year for experimental studies was to measure transport in cementitious material by utilization of a leaching method and reduction capacity of saltstone field samples. Results are being used to calibrate and validate the updated carbonation model.

  4. FY2012 Three Year Rolling Timeline | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007FY 2014 Solid0612 EEREFY2012

  5. Information Services and Technology FY2009 Strategic Plan

    E-Print Network [OSTI]

    Gabrieli, John

    the best and most cost effective information services support and technology available; communicationInformation Services and Technology FY2009 Strategic Plan Page 1 of 2 Current as of June 18, 2008 Information Services and Technology (IS&T) enables MIT's core mission -- to advance knowledge and educate

  6. Oak Ridge National Laboratory Institutional Plan, FY 1997--FY 2002

    SciTech Connect (OSTI)

    NONE

    1996-10-01T23:59:59.000Z

    Three major initiatives are described, which are proposed to strengthen ORNL`s ability to support the missions of the Department: neutron science, functional genomics, and distributed computing at teraflop speeds. The laboratory missions, strategic plan, scientific and technical programs, enterprise activities, laboratory operations, and resource projections are also described.

  7. Institutional Plan, FY 1995--2000

    SciTech Connect (OSTI)

    NONE

    1994-10-01T23:59:59.000Z

    Sandia recently completed an updated strategic plan, the essence of which is presented in chapter 4. Sandia`s Strategic Plan 1994 takes its direction from DOE`s Fueling a Competitive Economy: Strategic Plan and provides tangible guidance for Sandia`s programs and operations. Although it is impossible to foresee precisely what activities Sandia will pursue many years from now, the strategic plan makes one point clear: the application of our scientific and engineering skills to the stewardship of the nation`s nuclear deterrent will be central to our service to the nation. We will provide the necessary institutional memory and continuity, experience base, and technical expertise to ensure the continued safety, security, and reliability of the nuclear weapons stockpile. As a multiprogram laboratory, Sandia will also continue to focus maximum effort on a broad spectrum of other topics consistent with DOE`s enduring core mission responsibilities: Defense (related to nuclear weapons), Energy, Environment (related to waste management and environmental remediation), and Basic Science.

  8. High performance computing and communications: FY 1996 implementation plan

    SciTech Connect (OSTI)

    NONE

    1995-05-16T23:59:59.000Z

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  9. Deputy Inspector General for audit services. FY 1998 annual performance plan

    SciTech Connect (OSTI)

    NONE

    1997-09-30T23:59:59.000Z

    This plan outlines the audie strategies that the Deputy Inspector General for Audit Services intends to implement and execute in Fiscal Year (FY) 1998. The plan also includes the details of efforts to improve customer service and to implement the Inspector General`s streamlining initiatives. The FY 1997/1998 Strategic Plan emphasizes six key issue areas: Financial Management, Contract Administration, Program Management, Environmental Quality, Infrastructure and Administrative Safeguards. These issue areas were chosen to ensure that the Inspector General`s audit, inspection, and investigative functions are focused to assist the Department to reach its goals, pursue its strategies, and monitor its success indicators. This plan also establishes goals, objectives, and performance measures, which are discussed in detail in Appendix I.

  10. Brookhaven National Laboratory Institutional Plan FY2001--FY2005

    SciTech Connect (OSTI)

    Davis, S.

    2000-10-01T23:59:59.000Z

    Brookhaven National Laboratory is a multidisciplinary laboratory in the Department of Energy National Laboratory system and plays a lead role in the DOE Science and Technology mission. The Laboratory also contributes to the DOE missions in Energy Resources, Environmental Quality, and National Security. Brookhaven strives for excellence in its science research and in facility operations and manages its activities with particular sensitivity to environmental and community issues. The Laboratory's programs are aligned continuously with the goals and objectives of the DOE through an Integrated Planning Process. This Institutional Plan summarizes the portfolio of research and capabilities that will assure success in the Laboratory's mission in the future. It also sets forth BNL strategies for our programs and for management of the Laboratory. The Department of Energy national laboratory system provides extensive capabilities in both world class research expertise and unique facilities that cannot exist without federal support. Through these national resources, which are available to researchers from industry, universities, other government agencies and other nations, the Department advances the energy, environmental, economic and national security well being of the US, provides for the international advancement of science, and educates future scientists and engineers.

  11. Pacific Northwest National Laboratory Institutional Plan FY 2001-2005

    SciTech Connect (OSTI)

    Fisher, Darrell R.; Pearson, Erik W.

    2000-12-29T23:59:59.000Z

    The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

  12. Pacific Northwest National Laboratory Institutional Plan FY 2000-2004

    SciTech Connect (OSTI)

    Pearson, Erik W.

    2000-03-01T23:59:59.000Z

    The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.

  13. Superconductivity for electric systems program plan, FY 1996--FY 2000

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    This describes a comprehensive, integrated approach for the development of HTS (high-temperature superconductivity) technology for cost-effective use in electric power applications. This approach supports the program`s mission: to develop the technology that could lead to industrial commercialization of HTS electric power applications, such as fault-current limiters, motors, generators, transmission cables, superinductors, and superconducting energy storage. The vision is that, by 2010, the US power systems equipment industry will regain a major share of the global market by offering superconducting products that outperform the competition; and in US, the power grid will gain increased efficiency and stability by incorporating many kinds of HTS devices. After an overview and a discussion of the program plan (wires, systems technology, partnership initiative), this document discusses technology status, stakeholders, and the role of US DOE.

  14. Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)

    SciTech Connect (OSTI)

    Higginson, M.C.

    1994-10-01T23:59:59.000Z

    The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford`s environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO{sub 3} plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996).

  15. Liquid effluent/Hanford Environmental compliance FY 1995 Multi-Year Program Plan/Fiscal Year Work Plan, WBS 1.2.2.1 and 1.2.2.2

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This document details the program effort to eliminate the use of the soil column for liquid effluent treatment and to manage current and future liquid effluent streams at the Hanford Site, in a safe responsible cost effective and legally compliant mannger. This should be achieved through planning, public and stakeholder interaction, definition of requiremtns for generators, and provision of timely treatment, stroage, disposal capability, and waste minimization of waste streams.

  16. FY 2015 OFFICE OF BUDGET & FINANCE STRATEGIC PLAN Strategic Plan Items & Projects

    E-Print Network [OSTI]

    O'Toole, Alice J.

    .2.4. Implement Activity Guide Functionality in SIS 3.3. Improve Processes and Systems 3.3.1. Deliver the ProjectsFY 2015 OFFICE OF BUDGET & FINANCE STRATEGIC PLAN Strategic Plan Items & Projects 1.0. OPERATIONAL Policies and SAPs 1.1.2. Expand Utilization and Effectiveness of askYODA 1.1.3. Implement Continuous

  17. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    SciTech Connect (OSTI)

    Morrison, M.I. [Midwest Technical Inc., Oak Ridge, Tennessee (United States); McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D. [Oak Ridge National Lab., TN (United States)

    1995-02-01T23:59:59.000Z

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections.

  18. High performance computing and communications: FY 1995 implementation plan

    SciTech Connect (OSTI)

    NONE

    1994-04-01T23:59:59.000Z

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  19. Irradiation Planning for Fully-Ceramic Micro-encsapsulated fuel in ATR at LWR-relevant conditions: year-end report on FY-2011

    SciTech Connect (OSTI)

    Abderrafi M. Ougouag; R. Sonat Sen; Michael A. Pope; Brian Boer

    2011-09-01T23:59:59.000Z

    This report presents the estimation of required ATR irradiation levels for the DB-FCM fuel design (fueled with Pu and MAs). The fuel and assembly designs are those considered in a companion report [R. S. Sen et al., FCR&D-2011- 00037 or INL/EXT-11-23269]. These results, pertaining to the DB-FCM fuel, are definitive in as much as the design of said fuel is definitive. In addition to the work performed, as required, for DB-FCM fuel, work has started in a preliminary fashion on single-cell UO2 and UN fuels. These latter activities go beyond the original charter of this project and although the corresponding work is incomplete, significant progress has been achieved. However, in this context, all that has been achieved is only preliminary because the corresponding fuel designs are neither finalized nor optimized. In particular, the UO2 case is unlikely to result in a viable fuel design if limited to enrichment at or under 20 weight % in U-235. The UN fuel allows reasonable length cycles and is likely to make an optimal design possible. Despite being limited to preliminary designs and offering only preliminary conclusions, the irradiation planning tasks for UO2 and UN fuels that are summarized in this report are useful to the overall goal of devising and deploying FCM-LWR fuel since the methods acquired and tested in this project and the overall procedure for planning will be available for planning tests for the finalized fuel design. Indeed, once the fuel design is finalized and the expected burnup level is determined, the methodology that has been assembled will allow the prompt finalization of the neutronic planning of the irradiation experiment and would provide guidance on the expected experimental performance of the fuel. Deviations from the expected behavior will then have to be analyzed and the outcome of the analysis may be corrections or modifications for the assessment models as well as, possibly, fuel design modifications, and perhaps even variation of experimental control for future experimental phases. Besides the prediction of irradiation times, preliminary work was carried out on other aspects of irradiation planning. In particular, a method for evaluating the interplay of depletion, material performance modeling and irradiation is identified by reference to a companion report. Another area that was addressed in a preliminary fashion is the identification and selection of a strategy for the physical and mechanical design of the irradiation experiments. The principal conclusion is that the similarity between the FCM fuel and the fuel compacts of the Next Generation Nuclear Plant prismatic design are strong enough to warrant using irradiation hardware designs and instrumentation adapted from the AGR irradiation tests. Modifications, if found necessary, will probably be few and small, except as pertains to the water environment and its implications on the use of SiC cladding or SiC matrix with no additional cladding.

  20. LBNL Institutional Plan, FY 1996--2001. Draft

    SciTech Connect (OSTI)

    NONE

    1995-06-01T23:59:59.000Z

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  1. Planned Audits and Inspections FY 2013 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHA Administrative Judgea.Work Plan for FY 2013 A list of audits and

  2. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.

  3. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.

  4. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.

  5. FY 2006 Council Recommended Fish and Wildlife Start of Year budgets Province Subbasin Project # Title Sponsor

    E-Print Network [OSTI]

    Project # Title Sponsor BPA Project Manager FY 2005 Council SOY Budget Budget Request July memo issue, Joe $175,000 3 $175,000 Washington Wildlife Agreement project.Base O&M until management plan Province Subbasin Project # Title Sponsor BPA Project Manager FY 2005 Council SOY Budget Budget Request

  6. NUCLEAR ENGINEERING Four Year Plan

    E-Print Network [OSTI]

    Tullos, Desiree

    ;Nuclear Engineering Four Year Plan Starting Fall 2009 FALL Year 1 Credits WINTER Year 1 Credits SPRINGNUCLEAR ENGINEERING Four Year Plan Fall 2009 Nuclear Engineering (67 hrs) CH Grade Perspectives (15 I NE 452 3 Neutronic Analysis II NE 457 2 Nuclear Reactor Lab Western Culture (3): NE 467 4 Nucl

  7. FY 2007/2008 Contractor Performance Plan, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2006-10-03T23:59:59.000Z

    This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.

  8. Oil program implementation plan FY 1996--2000

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  9. Building America's Low-e Storm Window Adoption Program Plan (FY2014)

    SciTech Connect (OSTI)

    Cort, Katherine A.

    2013-12-23T23:59:59.000Z

    Low emissivity (low-e) storm windows/panels appear to hold promise for effectively reducing existing home heating, ventilation, and air-conditioning (HVAC) consumption. Due to the affordability of low-e storm windows and the large numbers of existing homes that have low-performing single-pane or double-pane clear windows, a tremendous opportunity exists to provide energy savings by transforming the low-e storm window market and increasing market adoption. This report outlines U.S. Department of Energy (DOE) Building America’s planned market transformation activities in support of low-e storm window adoption during fiscal year (FY) 2014.

  10. Planning Amid Abundance: Alaska’s FY 2013 Budget Process

    E-Print Network [OSTI]

    McBeath, Jerry

    2013-01-01T23:59:59.000Z

    2011) “The Outlier State: Alaska’s FY 2012 Budget,” AnnualWestern States Budget Review. New York Times, selectedAbundance: Alaska’s FY 2013 Budget Process Abstract: This

  11. NEAMS Software Licensing, Release, and Distribution: Implications for FY2013 Work Package Planning

    SciTech Connect (OSTI)

    Bernholdt, David E [ORNL

    2012-06-01T23:59:59.000Z

    The vision of the NEAMS program is to bring truly predictive modeling and simulation (M&S) capabilities to the nuclear engineering community in order to enable a new approach to the analysis of nuclear systems. NEAMS anticipates issuing in FY 2018 a full release of its computational 'Fermi Toolkit' aimed at advanced reactor and fuel cycles. The NEAMS toolkit involves extensive software development activities, some of which have already been underway for several years, however, the Advanced Modeling and Simulation Office (AMSO), which sponsors the NEAMS program, has not yet issued any official guidance regarding software licensing, release, and distribution policies. This motivated an FY12 task in the Capability Transfer work package to develop and recommend an appropriate set of policies. The current preliminary report is intended to provide awareness of issues with implications for work package planning for FY13. We anticipate a small amount of effort associated with putting into place formal licenses and contributor agreements for NEAMS software which doesn't already have them. We do not anticipate any additional effort or costs associated with software release procedures or schedules beyond those dictated by the quality expectations for the software. The largest potential costs we anticipate would be associated with the setup and maintenance of shared code repositories for development and early access to NEAMS software products. We also anticipate an opportunity, with modest associated costs, to work with the Radiation Safety Information Computational Center (RSICC) to clarify export control assessment policies for software under development.

  12. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    SciTech Connect (OSTI)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-12-31T23:59:59.000Z

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites` input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves.

  13. Materials Corrosion and Mitigation Strategies for APT: End of Year Report, FY '96

    E-Print Network [OSTI]

    Materials Corrosion and Mitigation Strategies for APT: End of Year Report, FY '96 R. Scott Lillard, Darryl P. Butt Materials Corrosion and Environmental Effects Laboratory MST-6, Metallurgy Los Alamos accomplishment in FY '96 was the design and fabrication of the corrosion probes to be used "In Beam" during

  14. Office of Inspector General fiscal year 1996 annual work plan

    SciTech Connect (OSTI)

    NONE

    1995-10-01T23:59:59.000Z

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  15. Environmental Sciences Division long-range plan (FY 1987-FY 1992)

    SciTech Connect (OSTI)

    Not Available

    1987-04-01T23:59:59.000Z

    This third long-range plan of the Environmental Sciences Division (ESD) addresses the five-year period 1987 to 1992. It is a statement of the characteristics of the Division - the scope of its disciplinary research and development (R and D) activities, its unique staff resources, and its exceptional research facilities and support services. This strategic plan addresses the long-term scientific development and programmatic foci of the Division's goals. The near-term implementation of these goals through meeting specific tactical objectives is articulated in a separate, succinct action plan, updated biennially to reflect changing programmatic priorities and key new initiatives planned. 11 refs., 5 figs., 4 tabs.

  16. NASA FY 2015 Budget Request FY 2014 FY 2015

    E-Print Network [OSTI]

    NASA FY 2015 Budget Request Actuals FY 2013 Enacted FY 2014 FY 2015 Notional FY 2016 Notional FY's Fiscal Year 2015 budget supports investments that will ensure continued U.S. leadership in space, while 2017 Notional FY 2018 Notional FY 2019 $16.9B $17.6B $17.5B $17.6B $17.8B $18.0B $18.2B The President

  17. Revised November 5, 2012 FY 2013 MODEL SMALL BUSINESS SUBCONTRACTING PLAN

    E-Print Network [OSTI]

    Kemner, Ken

    Revised November 5, 2012 SAMPLE FY 2013 MODEL SMALL BUSINESS SUBCONTRACTING PLAN CONTRACTOR is a suggested model for use when developing subcontracting plans as required by P.L. 95-507 and implemented by Federal Acquisition Regulations (FAR) Subpart 19.7. While this model plan has been designed

  18. FY 2006 budget responses: Subbasin planning responses only Blue Mountain Asotin

    E-Print Network [OSTI]

    FY 2006 budget responses: Subbasin planning responses only Blue Mountain Asotin 1994-018-05 - Asotin Enhancement/Restoration (Expense) Consistency with subbasin plans This project is consistent-050-00 - Riparian Buffer Couse/Ten Mile (Expense) Consistency with subbasin plans This project is consistent

  19. FY 1991--FY 1995 Information Technology Resources Long-Range Plan

    SciTech Connect (OSTI)

    Not Available

    1989-12-01T23:59:59.000Z

    The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.

  20. Sandia National Laboratories Institutional Plan FY1994--1999

    SciTech Connect (OSTI)

    Not Available

    1993-10-01T23:59:59.000Z

    This report presents a five year plan for the laboratory. This plan takes advantage of the technical strengths of the lab and its staff to address issues of concern to the nation on a scope much broader than Sandia`s original mission, while maintaining the general integrity of the laboratory. The plan proposes initiatives in a number of technologies which overlap the needs of its customers and the strengths of its staff. They include: advanced manufacturing technology; electronics; information and computational technology; transportation energy technology and infrastructure; environmental technology; energy research and technology development; biomedical systems engineering; and post-cold war defense imperatives.

  1. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    SciTech Connect (OSTI)

    Not Available

    1991-08-01T23:59:59.000Z

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  2. DEPARTMENT OF DEFENSE LUNG CANCER RESEARCH PROGRAM FISCAL YEAR 2013 STRATEGIC PLAN

    E-Print Network [OSTI]

    von der Heydt, Rüdiger

    DEPARTMENT OF DEFENSE LUNG CANCER RESEARCH PROGRAM FISCAL YEAR 2013 STRATEGIC PLAN The Fiscal Year 2013 (FY13) Defense Appropriations Act provides for $10.5 million to the Department of Defense Lung Cancer Research Program (LCRP) to support innovative, high- impact lung cancer research. This program

  3. LAPSE IN FY'14 APPROPRIATIONS -GUIDANCE FOR GFAD GRANTEES As many of you are aware, Fiscal Year (FY) 2013 funding for the Federal Government expired at

    E-Print Network [OSTI]

    Kroll, Kristen L.

    LAPSE IN FY'14 APPROPRIATIONS - GUIDANCE FOR GFAD GRANTEES As many of you are aware, Fiscal Year furloughed. Impacts that GFAD Grantees Can Expect During the Lapse in FY14 Appropriations: Will the lapse grantees will NOT be able to draw down funds from the Payment Management Smartlink System during the lapse

  4. Concurrence' Lawrence Livermore National Laboratory FY2015 Ten...

    National Nuclear Security Administration (NNSA)

    manufacturing * Special nuclear materials-plutonium and tritium * High performance computing FY2015 Ten Year Site Plan Limited Report Page 3 of 6 Lawrence Livermore...

  5. Lawrence Berkeley Laboratory Institutional Plan FY 1995--2000

    SciTech Connect (OSTI)

    NONE

    1994-12-01T23:59:59.000Z

    This report presents the details of the mission and strategic plan for Lawrence Berkeley Laboratory during the fiscal years of 1995--2000. It presents summaries of current programs and potential changes; critical success factors such as human resources; management practices; budgetary allowances; and technical and administrative initiatives.

  6. Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

    SciTech Connect (OSTI)

    Marmorek, David R.; Porter, Marc; Pickard, Darcy; Wieckowski, Katherine

    2008-11-19T23:59:59.000Z

    The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These FY2008 data assessments and others assembled over the years of the CSMEP project can be accessed on the CBFWA public website. The CSMEP web database (http://csmep.streamnet.org/) houses metadata inventories from S&W assessments of Columbia River Basin watersheds that were completed prior to FY2008. These older S&W assessments are maintained by StreamNet, but budget cutbacks prevented us from adding the new FY2008 assessments into the database. Progress was made in FY2008 on CSMEP's goals of collaborative design of improved M&E methods. CSMEP convened two monitoring design workshops in Portland (December 5 and 6, 2007 and February 11 and 12, 2008) to continue exploration of how best to integrate the most robust features of existing M&E programs with new approaches. CSMEP continued to build on this information to develop improved designs and analytical tools for monitoring the status and trends of fish populations and the effectiveness of hatchery and hydrosystem recovery actions within the Columbia River Basin. CSMEP did not do any new work on habitat or harvest effectiveness monitoring designs in FY2008 due to budget cutbacks. CSMEP presented the results of the Snake Basin Pilot Study to the Independent Scientific Review Panel (ISRP) in Portland on December 7, 2008. This study is the finalization of CSMEP's pilot exercise of developing design alternatives across different M&E domains within the Snake River Basin spring/summer Chinook ESU. This work has been summarized in two linked reports (CSMEP 2007a and CSMEP 2007b). CSMEP participants presented many of the analyses developed for the Snake Basin Pilot work at the Western Division American Fisheries Society (AFS) conference in Portland on May 4 to 7, 2008. For the AFS conference CSMEP organized a symposium on regional monitoring and evaluation approaches. A presentation on CSMEP's Cost Integration Database Tool and Salmon Viability Monitoring Simulation Model developed for the Snake Basin Pilot Study was also given to the Pacific Northwest Aquatic monitoring Partnership (PNAMP) stee

  7. FY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA - Request Log Closed/ No. Dated

  8. Westinghouse Hanford Company FY 1996 Materials Management Plan (MMP)

    SciTech Connect (OSTI)

    Higginson, M.C.

    1995-12-01T23:59:59.000Z

    The safe and sound operation of facilities and the storage of nuclear material are top priorities within Hanford`s environmental management, site restoration mission. The assumptions, plans and Special Nuclear Material (SNM) inventory summaries contained in this document were prepared for Department of Energy (DOE) use for interim and long- range planning. In accordance with Richland DOE field office (DOE-RL) direction, year-end inventory values were not projected over an 11 year period, as historically done in previous MMP documents. This decision was made since significant SNM movements to or from Hanford are not projected in the foreseeable future. Instead, the inventory summaries within this document reflect an ``as of date`` of June 30, 1995.

  9. Nuclear Waste Technical Review Board Strategic Plan for FY 2001-2006

    E-Print Network [OSTI]

    Appendix G Nuclear Waste Technical Review Board Strategic Plan for FY 2001-2006 (Revised March 2001) Statement of the Chairman The U.S. Nuclear Waste Technical Review Board was established as an independent agency of the United States Government on December 22, 1987, in the Nuclear Waste Policy Amendments Act

  10. FY10 Transition Plan For CCDD Applied Research Center (ARC) on Precipitation

    E-Print Network [OSTI]

    FY10 Transition Plan For CCDD Applied Research Center (ARC) on Precipitation Pingping Xie Climate- Statement of transition goal Due to the manual operation nature, this processing cannot be converted transition to date N/A C- Location of data set production, identification of production team (including

  11. Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan

    SciTech Connect (OSTI)

    Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

    2001-10-31T23:59:59.000Z

    This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report

  12. Five-Year Master Plan University of Michigan-Ann Arbor

    E-Print Network [OSTI]

    Kamat, Vineet R.

    Five-Year Master Plan University of Michigan-Ann Arbor Prepared by: University of Michigan UNIVERSITY OF MICHIGAN-ANN ARBOR FY2015 TABLE OF CONTENTS I. Mission Statement II. Instructional Programming The mission of the University of Michigan is to serve the people of Michigan and the world through preeminence

  13. BROOKHAVEN NATIONAL LABORATORY INSTITUTIONAL PLAN FY2003-2007.

    SciTech Connect (OSTI)

    NONE

    2003-06-10T23:59:59.000Z

    This document presents the vision for Brookhaven National Laboratory (BNL) for the next five years, and a roadmap for implementing that vision. Brookhaven is a multidisciplinary science-based laboratory operated for the U.S. Department of Energy (DOE), supported primarily by programs sponsored by the DOE's Office of Science. As the third-largest funding agency for science in the U.S., one of the DOE's goals is ''to advance basic research and the instruments of science that are the foundations for DOE's applied missions, a base for U.S. technology innovation, and a source of remarkable insights into our physical and biological world, and the nature of matter and energy'' (DOE Office of Science Strategic Plan, 2000 http://www.osti.gov/portfolio/science.htm). BNL shapes its vision according to this plan.

  14. Management and Performance PERFORMANCE REPORTING AND PLANNING

    E-Print Network [OSTI]

    Waliser, Duane E.

    2015 Performance Plan, starting with the currently reported year of FY 2013 and spanning backward from FY 2008 to FY 2012, go to http://www.nasa.gov/about/budget/PAR_Reports.html. The combined report 2014 and/or FY 2015. The performance goal summary is followed by: · The annual performance indicators

  15. FY 2011 OIG Recovery Act Plan Overview | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 Russian NuclearandJunetrackEllen|JulyR--FOIA SupportDOE's FY 2011

  16. FY 2009 Strategic Plan for Minority Education Programs | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport in RepresentativeDepartment of Energy 1. Recycling FY

  17. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    SciTech Connect (OSTI)

    Cartmell, D.B.

    1995-09-01T23:59:59.000Z

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.

  18. DOE-NE Proliferation and Terrorism Risk Assessment: FY12 Plans Update

    SciTech Connect (OSTI)

    Sadasivan, Pratap [Los Alamos National Laboratory

    2012-06-21T23:59:59.000Z

    This presentation provides background information on FY12 plans for the DOE Office of Nuclear Energy Proliferation and Terrorism Risk Assessment program. Program plans, organization, and individual project elements are described. Research objectives are: (1) Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of current reactors; (2) Develop improvements in the affordability of new reactors to enable nuclear energy; (3) Develop Sustainable Nuclear Fuel Cycles; and (4) Understand and minimize the risks of nuclear proliferation and terrorism - Goal is to enable the use of risk information to inform NE R&D program planning.

  19. Technical support section annual work plan for FY 1996

    SciTech Connect (OSTI)

    Adkissson, B.P.; Allison, K.L.; Hess, R.A.; Kunselman, C.W.; Odom, S.M.; Smelcer, D.R.

    1996-04-01T23:59:59.000Z

    The Technical Support Section (TSS) of the Instrumentation and Controls (I&C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Work performed by TSS is in support of basic and applied research and development (R&D), engineering and instrument and computer systems managed by ORNL. It is the mission of TSS to support programs and policies of ORNL, emphasizing safety and ensuring cost-effective support for R&D. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from and driven directly by current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R&D programs because of attrition or budget cuts and the establishment of new facilities or environmental safety and health programs. TSS does not have an annual budget to cover operating expenses incurred in providing instrumentation maintenance support to ORNL. Each year TSS contacts ORNL division finance managers or division finance officers to obtain information concerning projected funding levels of programs and facilities they manage. Although TSS has no direct responsibility for the maintenance or repair of real property, it does perform breakdown maintenance, preventive maintenance and calibration of laboratory, production, and experimental equipment, all of which is used for programmatic purposes. Operating expense funds from supported divisions support this type of equipment.

  20. General Counsel`s office FY 1995 site support program plan WBS 6.10.5

    SciTech Connect (OSTI)

    Moreno, S.R.

    1994-09-01T23:59:59.000Z

    The General Counsel`s office provides legal counsel to all levels of WHC management; administers the intellectual property program; coordinates all WHC investigative activity and supports WHC activities to ensure compliance with all applicable federal, state, and local laws, DOE directives, contractual provisions, and other requirements. In so doing, the Office of General Counsel supports the Hanford site mission of transforming the Hanford site into an environmentally attractive and economically sustainable community. This document briefs the FY95 site support plan.

  1. Planning for Years to Come

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Enlarge Create a Sustainable Future: Planning LANL's Governing Policy on the Environment Environmental Sustainability Goals Environmental Management System Regulatory...

  2. Idaho National Laboratory 2013-2022 Ten-Year Site Plan

    SciTech Connect (OSTI)

    Calvin Ozaki; Sheryl L. Morton; Elizabeth A. Connell; William T. Buyers; Craig L. Jacobson; Charles T. Mullen; Christopher P. Ischay; Ernest L. Fossum; Robert D. Logan

    2011-06-01T23:59:59.000Z

    The Idaho National Laboratory (INL) Ten-Year Site Plan (TYSP) describes the strategy for accomplishing the long-term objective of transforming the laboratory to meet Department of Energy (DOE) national nuclear research and development (R&D) goals, as outlined in DOE strategic plans. The plan links R&D mission goals and INL core capabilities with infrastructure requirements (single- and multi-program), establishs the 10-year end-state vision for INL complexes, and identifies and prioritizes infrastructure needs and capability gaps. The TYSP serves as the basis for documenting and justifying infrastructure investments proposed as part of the FY 2013 budget formulation process.

  3. New Orleans Urbanized Area Metropolitan Transportation Plan FY 2032

    E-Print Network [OSTI]

    New Orleans Urbanized Area Regional Planning Commission

    2007-06-12T23:59:59.000Z

    which are more economical or which have less environmental eff ects while achieving similar transportation objectives. Burgeoning corridors such as the corridor between the Louis Armstrong International Airport and the Central Business District...2 0 23 F Y Metropolitan Transportation Plan New Orleans Urbanized AreaNew Regional Planning Commission Jefferson, Orleans Plaquemines, St. Bernard and St. Tammany Parishes, Louisiana June 12, 2007 Metropolitan Transportation Plan New Orleans...

  4. Pacific Northwest National Laboratory institutional plan: FY 1996--2001

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This report contains the operation and direction plan for the Pacific Northwest National Laboratory of the US Department of Energy. The topics of the plan include the laboratory mission and core competencies, the laboratory strategic plan; the laboratory initiatives in molecular sciences, microbial biotechnology, global environmental change, complex modeling of physical systems, advanced processing technology, energy technology development, and medical technologies and systems; core business areas, critical success factors, and resource projections.

  5. Planning Amid Abundance: Alaska’s FY 2013 Budget Process

    E-Print Network [OSTI]

    McBeath, Jerry

    2013-01-01T23:59:59.000Z

    state’s incentives for oil investment are excessive” (FDNM,increased oil industry investment. Planning Amid Abundance:oil corporations said that additional investment was

  6. FY97 Geothermal R&D Program Plan

    SciTech Connect (OSTI)

    None

    1996-09-01T23:59:59.000Z

    This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

  7. Combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsNovember 13, 2014 BuildingEnergy Efficiency andAnnual Performance Plan |

  8. Combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsNovember 13, 2014 BuildingEnergy Efficiency andAnnual Performance Plan |Annual

  9. Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsNovember 13, 2014 BuildingEnergy Efficiency andAnnual Performance Plan

  10. Combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsNovember 13, 2014 BuildingEnergy Efficiency andAnnual Performance PlanAnnual

  11. Bioenergy Technologies Office Multi-Year Program Plan: November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update This Multi-Year Program Plan...

  12. Updated DIII-D experimental plan for FY-1989

    SciTech Connect (OSTI)

    Luxon, J.L. [ed.

    1989-08-01T23:59:59.000Z

    The program proposed here is designed to support and build toward the long-term plan put forward during 1987 for the DIII-D facility. This plan has as its ultimate goal developing sufficient understanding and predictive capability to enable the demonstration of a high beta plasma with non-inductively driven toroidal current. The early stages of this plan call for the optimization of the plasma configuration for good confinement at high beta while simultaneously developing the need rf power systems for current drive, profile control, and heating.

  13. FY 1999 Spent Nuclear Fuel Interim Management Plan

    SciTech Connect (OSTI)

    Dupont, M.

    1998-12-21T23:59:59.000Z

    This document has been prepared to present in one place the near and long-term plans for safe management of SRS SNF inventories until final disposition has been identified and implemented.

  14. Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004

    SciTech Connect (OSTI)

    Chartock, Mike (ed.); Hansen, Todd (ed.)

    1999-08-01T23:59:59.000Z

    The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  15. Technical Support Section annual work plan for FY 1995

    SciTech Connect (OSTI)

    Adkisson, B.P.; Hess, R.A.; Kunselman, C.W.; Millet, A.J.; Smelcer, D.R.

    1994-10-01T23:59:59.000Z

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Work performed by TSS is in support of basic and applied research and development (R and D), engineering, and instrument and computer systems managed by ORNL. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from and driven directly by current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts and the establishment of new facilities or environmental safety and health programs. The ``Long-Range Work Plan`` is based on estimates of impact of the long-range priorities and directions of the Laboratory. Identifiable proposed new facilities and programs provide additional basis for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new-hires, and identification of essential test equipment needed in new work.

  16. Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  17. Seismic Safety Margins Research Program: Phase II program plan (FY 83-FY 84)

    SciTech Connect (OSTI)

    Bohn, M.P.; Bernreuter, D.L.; Cover, L.E.; Johnson, J.J.; Shieh, L.C.; Shukla, S.N.; Wells, J.E.

    1982-08-02T23:59:59.000Z

    The Seismic Safety Margins Research Program (SSMRP) is an NRC-funded, multiyear program conducted by Lawrence Livermore National Laboratory (LLNL). Its goal is to develop a complete, fully coupled analysis procedure (including methods and computer codes) for estimating the risk of an earthquake-caused radioactive release from a commercial nuclear power plant. The analysis procedure is based upon a state-of-the-art evaluation of the current seismic analysis and design process and explicitly includes the uncertainties inherent in such a process. The results will be used to improve seismic licensing requirements for nuclear power plants. As currently planned, the SSMRP will be completed in September, 1984. This document presents the program plan for work to be done during the remainder of the program. In Phase I of the SSMRP, the necessary tools (both computer codes and data bases) for performing a detailed seismic risk analysis were identified and developed. Demonstration calculations were performed on the Zion Nuclear Power Plant. In the remainder of the program (Phase II) work will be concentrated on developing a simplified SSMRP methodology for routine probabilistic risk assessments, quantitative validation of the tools developed and application of the simplified methodology to a Boiling Water Reactor. (The Zion plant is a pressurized water reactor.) In addition, considerable effort will be devoted to making the codes and data bases easily accessible to the public.

  18. Pacific Northwest Laboratory Institutional Plan FY 1995-2000

    SciTech Connect (OSTI)

    Not Available

    1994-12-01T23:59:59.000Z

    This report serves as a document to describe the role PNL is positioned to take in the Department of Energy`s plans for its national centers in the period 1995-2000. It highlights the strengths of the facilities and personnel present at the laboratory, touches on the accomplishments and projects they have contributed to, and the direction being taken to prepare for the demands to be placed on DOE facilities in the near and far term. It consists of sections titled: director`s statement; laboratory mission and core competencies; laboratory strategic plan; laboratory initiatives; core business areas; critical success factors.

  19. Geothermal Division Multiyear Plan FY 1992-1996

    SciTech Connect (OSTI)

    None

    1990-12-21T23:59:59.000Z

    This administrative report of the Department of Energy is dated December 21, 1990. It is marked ''DRAFT'' as were many of this type of report, most of which were never made ''Final''. It provides contextual elements for program planning, and covers research on Hydrothermal, Geopressured Geothermal, Hot Dry Rock, and Magma Energy systems. (DJE 2005)

  20. Environmental development plan for transportation programs: FY80 update

    SciTech Connect (OSTI)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01T23:59:59.000Z

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  1. FY 2008 & FY 2009 Proposed Loan Guarantee Solicitation Implementation Plan

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAMDepartmentofof EnergyOverview46| Department

  2. Sandia National Laboratories Institutional Plan: FY 1996--2001

    SciTech Connect (OSTI)

    NONE

    1995-12-31T23:59:59.000Z

    Sandia`s Institutional Plan is by necessity a large document. As their missions have grown and diversified over the past decades, the variety of technical and site activities has increased. The programs and activities described here cover an enormous breadth of scientific and technological effort--from the creation of new materials to the development of a Sandia-wide electronic communications system. Today, there are three major themes that greatly influence this work. First, every federally funded institution is being challenged to find ways to become more cost effective, as the US seeks to reduce the deficit and achieve a balanced federal spending plan. Sandia is evaluating its business and operational processes to reduce the overall costs. Second, in response to the Galvin Task Force`s report ``Alternative Futures for the Department of Energy National Laboratories``, Sandia and the Department of Energy are working jointly to reduce the burden of administrative and compliance activities in order to devote more of the total effort to their principal research and development missions. Third, they are reevaluating the match between their missions and the programs they will emphasize in the future. They must demonstrate that Sandia`s roles--in national security, energy security, environmental integrity, and national scientific and technology agenda support--fit their special capabilities and skills and thus ensure their place in these missions for the longer planning horizon. The following areas are covered here: Sandia`s mission; laboratory directives; programmatic activities; technology partnerships and commercialization; Sandia`s resources; and protecting resources and the community.

  3. Planning Amid Abundance: Alaska’s FY 2013 Budget Process

    E-Print Network [OSTI]

    McBeath, Jerry

    2013-01-01T23:59:59.000Z

    return on investments. 2.1 Oil Prices Nine years ago, at theMurkowski administration, oil prices were in the $20/barrelmany casualties of low oil prices. Then global supply of oil

  4. Information Resources Management Strategic Plan FY2014-2018

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov.Energy02.pdf7 OPAM Flash2011-37EnergySubmitRoad2007Department, 2008 TO:Plan

  5. FY 1996 Congressional budget request: Budget highlights

    SciTech Connect (OSTI)

    Not Available

    1995-02-01T23:59:59.000Z

    The FY 1996 budget presentation is organized by the Department`s major business lines. An accompanying chart displays the request for new budget authority. The report compares the budget request for FY 1996 with the appropriated FY 1995 funding levels displayed on a comparable basis. The FY 1996 budget represents the first year of a five year plan in which the Department will reduce its spending by $15.8 billion in budget authority and by $14.1 billion in outlays. FY 1996 is a transition year as the Department embarks on its multiyear effort to do more with less. The Budget Highlights are presented by business line; however, the fifth business line, Economic Productivity, which is described in the Policy Overview section, cuts across multiple organizational missions, funding levels and activities and is therefore included in the discussion of the other four business lines.

  6. Hanford year 2000 Business Continuity Plan

    SciTech Connect (OSTI)

    ROGGENKAMP, S.L.

    1999-11-01T23:59:59.000Z

    The goal of Department of Energy Richland Operations (DOE-RL) Year 2000 (Y2K) effort is to ensure that the Hanford site successfully continues its mission as we approach and enter the 21th century. The Y2K Business Continuity Planning process provides a structured approach to identify Y2K risks to the site and to mitigate these risks through Y2K Contingency Planning, ''Zero-Day'' Transition Planning and Emergency Preparedness. This document defines the responsibilities, processes and plans for Hanford's Y2K Business Continuity. It identifies proposed business continuity drills, tentative schedule and milestones.

  7. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01T23:59:59.000Z

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

  8. NREL Photovoltaic Program FY 1993

    SciTech Connect (OSTI)

    Not Available

    1994-08-01T23:59:59.000Z

    This report reviews the in-house and subcontracted research and development (R&D) activities under the National Renewable Energy Laboratory (NREL) Photovoltaic (PV) Program from October 1, 1992, through September 30, 1993 (fiscal year [FY] 1993). The NREL PV Program is part of the U.S. Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE Photovoltaics Program Plan, FY 1991 - FY 1995. The FY 1993 budget authority (BA) for carrying out the NREL PV Program was $40.1 million in operating funds and $0.9 million in capital equipment funds. An additional $4.8 million in capital equipment funds were made available for the new Solar Energy Research Facility (SERF) that will house the in-house PV laboratories beginning in FY 1994. Subcontract activities represent a major part of the NREL PV Program, with more than $23.7 million (nearly 59%) of the FY 1993 operating funds going to 70 subcontractors. In FY 1993, DOE assigned certain other PV subcontracting efforts to the DOE Golden Field Office (DOE/GO), and assigned responsibility for their technical support to the NREL PV Program. An example is the PV:BONUS (Building Opportunities in the U.S. for Photovoltaics) Project. These DOE/GO efforts are also reported in this document.

  9. Natural Gas Multi-Year Program Plan

    SciTech Connect (OSTI)

    NONE

    1997-12-01T23:59:59.000Z

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  10. Bioenergy Technologies Office Multi-Year Program Plan: July 2014...

    Energy Savers [EERE]

    Bioenergy Technologies Office Multi-Year Program Plan: July 2014 Update Bioenergy Technologies Office Multi-Year Program Plan: July 2014 Update This Multi-Year Program Plan (MYPP)...

  11. Multi-Year SSL Market Development Support Plan

    SciTech Connect (OSTI)

    Ledbetter, Marc R.

    2012-05-01T23:59:59.000Z

    This plan sets out a strategic, five year framework for guiding DOE's market development support activities for high-performance solid-state lighting (SSL) products for the U.S. general illumination market. The market development support activities described in this plan, which span federal fiscal years 2012 to 2016, are intended to affect the types of SSL general illumination products adopted by the market, to accelerate commercial adoption of those products, and to support appropriate application of those products to maximize energy savings. DOE has established aggressive FY16 goals for these activities, including goals for the types of products brought to market, the market adoption of those products, and the energy savings achieved through use of SSL products. These goals are for the combined effect of DOE's SSL market development support and R and D investment, as well as the leveraged activities of its partners. Goals include: (1) inducing the market introduction of SSL products achieving 140 lumens per Watt (lm/W) for warm white products, and 155 lm/W for cool white products, and (2) inducing sales of high-performance SSL products that achieve annual site electricity savings of 21 terawatt hours (0.25 quadrillion Btus primary energy) by FY16. To overcome identified market barriers and to achieve the above five year goals, DOE proposes to carry out the following strategy. DOE will implement a multi-year program to accelerate adoption of good quality, high performance SSL products that achieve significant energy savings and maintain or improve lighting quality. Relying on lessons learned from past emerging technology introductions, such as compact fluorescent lamps, and using newly developed market research, DOE will design its efforts to minimize the likelihood that the SSL market will repeat mistakes that greatly delayed market adoption of earlier emerging technology market introductions. To achieve the maximum effect per dollar invested, DOE will work closely with lighting industry organizations 'such as the Next Generation Lighting Industry Alliance, North American Illuminating Engineering Society, and the International Association of Lighting Designers' and with other government programs seeking to improve lighting energy efficiency. While DOE will work closely with these organizations and others from lighting and electric utility industry, the program will focus primarily on assisting buyers of SSL products and others acting on their behalf because satisfied buyers are essential to the success of SSL market adoption. The work product of DOE's efforts will primarily be information, of the right type, at the right time, and provided efficiently to those who can best use it. A secondary work product of DOE's program will be market opportunities, in which DOE will seek to reduce the risks and costs for manufacturers of SSL products to sell good quality, high performance products to motivated buyers. In short, DOE plans to implement a multi-year program that produces highly useful and widely available information for buyers and their agents, while producing important market opportunities for producers, avoids the mistakes of the past, and is closely coordinated with industry and government. The market needs and the overall strategy were used for deciding which types of programs and projects DOE should create, and what general form they should take. Progress toward achieving plan goals with the above program elements will be monitored and periodically reported.

  12. Bioenergy Technologies Office Multi-Year Program Plan: July 2014...

    Broader source: Energy.gov (indexed) [DOE]

    July 2014 Update -- Sections Bioenergy Technologies Office Multi-Year Program Plan: July 2014 Update -- Sections This Multi-Year Program Plan (MYPP) sets forth the goals and...

  13. Multi-Year Program Plan FY'09-FY'15 Solid-State Lighting Research and Development

    SciTech Connect (OSTI)

    None

    2009-03-01T23:59:59.000Z

    President Obama's energy and environment agenda calls for deployment of 'the Cheapest, Cleanest, Fastest Energy Source - Energy Efficiency.' The Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy (EERE) plays a critical role in advancing the President's agenda by helping the United States advance toward an energy-efficient future. Lighting in the United States is projected to consume nearly 10 quads of primary energy by 2012.3 A nation-wide move toward solid-state lighting (SSL) for general illumination could save a total of 32.5 quads of primary energy between 2012 and 2027. No other lighting technology offers the DOE and our nation so much potential to save energy and enhance the quality of our built environment. The DOE has set forth the following mission statement for the SSL R&D Portfolio: Guided by a Government-industry partnership, the mission is to create a new, U.S.-led market for high-efficiency, general illumination products through the advancement of semiconductor technologies, to save energy, reduce costs and enhance the quality of the lighted environment.

  14. Office of Science 5-Year Budget Plan FY 2007FY 2011

    E-Print Network [OSTI]

    : fundamental research in energy, matter, and the basic forces of nature; health and environmental consequences technologies and environmental mitigation; a science base for fusion as a potential future energy source-edge scientific fields of the 21st century--areas like nanotechnology, material science, biotechnology, and high

  15. Combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008 Annual Performance Plan

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613PortsmouthBartlesville EnergyDepartment. Cash 6-1ClayChange:Energy

  16. National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of Contamination in Many DevilsForum |Energy NovemberC O OR DI N AT

  17. National Renewable Energy Laboratory 10 Year Site Plan FY2007 - FY2018

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of Contamination in Many DevilsForum |Energy NovemberC O OR DI N ATNational Renewable

  18. National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOilNEW HAMPSHIRE BUILDSEnergy 1DepartmentAugust 2008) ToPress

  19. Savannah River Site Waste Management Program Plan, FY 1993. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-06-01T23:59:59.000Z

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes.

  20. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect (OSTI)

    Chavis, D.M.

    1992-05-01T23:59:59.000Z

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  1. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect (OSTI)

    Chavis, D.M.

    1992-05-01T23:59:59.000Z

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  2. National Aeronautics and Space Administration Fiscal Year (FY) 2012 Report on

    E-Print Network [OSTI]

    and Reducing Personally Identifiable Information (PII) And Eliminating Unnecessary Use of Social Security Numbers (SSNs) October 10, 2012 #12;NASA FY12 PII Review and Reduction Report 1 NASA FY 2012 PII Review (PII) holdings in an effort to eliminate the unnecessary collection and use of PII, including Social

  3. Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93

    SciTech Connect (OSTI)

    Not Available

    1993-01-15T23:59:59.000Z

    This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites.

  4. Budget FY 1995 site support program plan WBS 6.10.1

    SciTech Connect (OSTI)

    Wemhoff, G.M.

    1994-09-01T23:59:59.000Z

    This is the program plan of Budget for the fiscal year 1995 site support. The topics of the program plan include a general mission statement, the primary customers, major activities performed to deliver products and services, program priorities, goals and objectives, assumptions, issues and constraints, performance measures, work breakdown structure and responsibility assignment matrix, description of activities and milestone list.

  5. Comprehensive program and plan for federal energy education, extension, and information activities: Fiscal Year 1981. Fifth report to congress

    SciTech Connect (OSTI)

    Not Available

    1981-12-01T23:59:59.000Z

    The activities conducted solely in Fiscal Year (FY) 1981 in the areas of Federal energy education, extension service, and information dissemination are reported. The broad purpose of the FY 1981 activities addressed has been to inform governmental and private sectors about the methods and technologies to conserve energy and to utilize renewable energy sources. With the increase in awareness on the part of energy users and decisionmakers, as well as additional information sources available from the private sector, the emphasis of the various Federal energy information activities is being focused on reporting results of Federal programs. The course of activities related to conservation and renewable energy information has been one of consolidation, both in terms of programmatic substance and methods. The practical impetus has been the redirection of Federal progrms and related budgetary revisions for FY 1981 and FY 1982. Further, products conveying information on conservation and renewable energy technologies have been examined extensively, pursuant to the Administration's directive in April 1981 on elimination of wasteful spending on periodicals, audiovisuals and similar materials. Efforts in coordination of conservation and renewable energy information activities of the Department of Energy (DOE) as well as other Federal agencies have adjusted to timetables for review and redirection of programs initially planned for FY 1981. Mechanisms to coordinate existing Federal energy information activities employed in previous fiscal years were continued in FY 1981 to the extent applicable under current Administration policy and the above-noted circumstances of redirection. Coordinating actions requiring convening of groups were held in abeyance pending resolution of programmatic issues.

  6. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...

    Energy Savers [EERE]

    Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...

  7. Integrated Task Plans for the Hanford Environmental Dose Reconstruction Project, FY 1992 through May 1994

    SciTech Connect (OSTI)

    Shipler, D.B.

    1992-09-01T23:59:59.000Z

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objective of work to be performed through May 1994 is to (1) determine the project's appropriate scope (space, time, radionuclides, pathways and individuals/population groups), (2) determine the project's appropriate level of accuracy (level of uncertainty in dose estimates) for the project, (3) complete model and data development, and (4) estimate doses for the Hanford Thyroid Disease Study (HTDS), representative individuals, and special populations as described herein. The plan for FY 1992 through May 1994 has been prepared based on activities and budgets approved by the Technical Steering Panel (TSP) at its meetings on August 19--20, 1991, and April 23--25, 1992. The activities can be divided into four broad categories: (1) model and data evaluation activities, (2)additional dose estimates, (3) model and data development activities, and (4)technical and communication support.

  8. Ten Year Site Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative JC3 RSS SeptemberRenewable Energy, U.S. DepartmentTechnology Ten Year Site Plans Ten

  9. FEMA Fiscal Year (FY) 2015 Tribal Homeland Security Grant Program (THSGP) Notice of Funding Opportunity (NOFO)

    Broader source: Energy.gov [DOE]

    The FY 2015 THSGP supports the building, sustainment and delivery of core capabilities to enable Tribes to strengthen their capacity to prevent, protect against, mitigate, respond to, and recover from potential terrorist attacks and other hazards.

  10. FourYear Academic Plan 20122013 BA in Geology

    E-Print Network [OSTI]

    FourYear Academic Plan 20122013 BA in Geology Internal Use Version Year 1 Year 2 Year 3 Year 4: Total UD Credits: 46 Total Credits: 120 3/19/12 #12;FourYear Academic Plan 20122013 BA in Geology

  11. FY 1992 revised task plans for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Shipler, D.B.

    1992-04-01T23:59:59.000Z

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objectives of work to be performed in FY 1992 is to determine the appropriate scope (space, time, and radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Another objective is to use a refined computer model to estimate Native American tribal doses and individual doses for the Hanford Thyroid Disease Study (HTDS). Project scope and accuracy requirements defined in FY 1992 can translated into model and data requirements that must be satisfied during FY 1993.

  12. FY 1992 revised task plans for the Hanford Environmental Dose Reconstruction Project. Revision 1

    SciTech Connect (OSTI)

    Shipler, D.B.

    1992-04-01T23:59:59.000Z

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objectives of work to be performed in FY 1992 is to determine the appropriate scope (space, time, and radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Another objective is to use a refined computer model to estimate Native American tribal doses and individual doses for the Hanford Thyroid Disease Study (HTDS). Project scope and accuracy requirements defined in FY 1992 can translated into model and data requirements that must be satisfied during FY 1993.

  13. APS Operational Statistics for FY 2005

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    asdopslogo1.gif (2896 bytes) APS FY2005 Operational Statistics Back to Main Statistics Page FY 2005 Year-to-Date Statistics 2005 Statistics Summary HTML or PDF FY 2005...

  14. Department of Energy Environment, Safety and Health Management Plan. Fiscal year 1996

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This report describes efforts by the Department of Energy (DOE) to effectively plan for environment, safety and health activities that protect the environment, workers and the public from harm. This document, which covers fiscal year 1996, reflects planning by operating contractors and Program Offices in early 1994, updated to be consistent with the President`s FY 1996 budget submittal to Congress, and subsequent Department of Energy Program refinements. Prior to 1992, only a small number of facilities had a structured process for identifying environment, safety and health (ES and H) needs, reporting the costs (in both direct and indirect budgets) of ES and H requirements, prioritizing and allocating available resources, and efficiently communicating this information to DOE. Planned costs for ES and H activities were usually developed as an afterthought to program budgets. There was no visible, consistently applied mechanism for determining the appropriate amount of resources that should be allocated to ES and H, or for assuring that significant ES and H vulnerabilities were planned to be funded. To address this issue, the Secretary (in November 1991) directed DOE to develop a Safety and Health Five-Year Plan to serve as a line management tool to delineate DOE-wide programs to reduce and manage safety and health risks, and to establish a consistent framework for risk-based resource planning and allocation.

  15. Bioenergy Technologies Office Multi-Year Program Plan: May 2013...

    Energy Savers [EERE]

    Bioenergy Technologies Office Multi-Year Program Plan: May 2013 Update Bioenergy Technologies Office Multi-Year Program Plan: May 2013 Update This is the May 2013 Update to the...

  16. EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report...

    Office of Environmental Management (EM)

    EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement EIS-0380: Fiscal Year 2011 Mitigation Action Plan...

  17. U.S. Department of Energy Office of Inspector General fiscal year 1999 annual performance plan

    SciTech Connect (OSTI)

    NONE

    1998-10-01T23:59:59.000Z

    This plan is published pursuant to requirements of the Government Performance and Results Act of 1993. The plan outlines the goals, objectives, and strategies that the Office of Inspector General intends to implement and execute in FY 1999. The plan also includes the details of this office`s efforts to continually improve customer service.

  18. A Sandia nuclear weapon knowledge management program plan for FY 1998--2003. Volume 1: Synopsis

    SciTech Connect (OSTI)

    NONE

    1998-02-01T23:59:59.000Z

    This volume contains a synopsis and briefing charts for a five-year plan which describes a Knowledge Management Program needed to meet Sandia`s responsibility for maintaining safety, security, reliability, and operational effectiveness of the nuclear weapon stockpile. Although the knowledge and expertise required to maintain and upgrade the stockpile continues to be critical to the country`s defense, Sandia`s historical process for developing and advancing future knowledge and expertise needs to be addressed. This plan recommends implementing an aggressive Knowledge Management Program to assure retention and furtherance of Sandia`s expertise, beginning in fiscal year 1998, as an integrated approach to solving the expertise dilemma.

  19. Oak Ridge National Laboratory Waste Management Plan, fiscal year 1994. Revision 3

    SciTech Connect (OSTI)

    Turner, J.W. [ed.

    1993-12-01T23:59:59.000Z

    US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, {open_quotes}Waste Management Plan Outline.{close_quotes} These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES&H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY) 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the Waste Management and Remedial Action Division (WMRAD) will (1) guide ORNL in optimizing waste reduction and waste management capabilities and (2) conduct waste management operations in a compliant, publicly acceptable, technically sound, and cost-efficient manner. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of this document is compilation and consolidation of information on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what activities are planned for FY 1994, and how all of the activities are documented.

  20. Institutional plan. Fiscal year, 1997--2002

    SciTech Connect (OSTI)

    NONE

    1996-10-01T23:59:59.000Z

    The Institutional Plan is the culmination of Argonne`s annual planning cycle. The document outlines what Argonne National Laboratory (ANL) regards as the optimal development of programs and resources in the context of national research and development needs, the missions of the Department of Energy and Argonne National Laboratory, and pertinent resource constraints. It is the product of ANL`s internal planning process and extensive discussions with DOE managers. Strategic planning is important for all of Argonne`s programs, and coordination of planning for the entire institution is crucial. This Institutional Plan will increasingly reflect the planning initiatives that have recently been implemented.

  1. Financial services FY 1995 site support program plan WBS 6.10.4

    SciTech Connect (OSTI)

    Vodney, E.P.

    1994-09-01T23:59:59.000Z

    This is the signed Financial Service fiscal year 1995 Site Support Program Plan, Work Breakdown Structure 6.10.4, for the Hanford site. This plan is intended to enable the contractor to accomplish the following: ensure financial integrity in all Westinghouse Hanford Company (WHC) operation while supporting the programmatic activities of WHC, the US Department of Energy, Richland Operations Office, and other Hanford contractors; provide efficient and effective financial services, and value added audits and review that enable management to enhance future operational results.

  2. FY 2009 Volume 1

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 2008 FY 20091

  3. FY 2009 Volume 2

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 2008 FY

  4. FY 2009 Volume 3

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 2008 FY3

  5. FY 2009 Volume 4

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 2008 FY34

  6. FY 2009 Volume 5

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 2008 FY34

  7. FY 2009 Volume 6

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 2008 FY346

  8. FY 2009 Volume 7

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 2008 FY3467

  9. FY 2010 Volume 1

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency8 FY81

  10. FY 2010 Volume 2

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency8 FY812

  11. FY 2009 National Renewable Energy Laboratory (NREL) Annual Report: A Year of Energy Transformation

    SciTech Connect (OSTI)

    Not Available

    2010-01-01T23:59:59.000Z

    This FY2009 Annual Report surveys the National Renewable Energy Laboratory's (NREL) accomplishments in renewable energy and energy efficiency research and development, commercialization and deployment of technologies, and strategic energy analysis. It offers NREL's vision and progress in building a clean, sustainable research campus and reports on community involvement.

  12. FY 2014-2018 DOE IRM Strategic Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 Russian NuclearandJunetrackEllen|JulyR--FOIA SupportDOE's FY3 CurrentFY

  13. FY 2007 Operating Plan for DOE--March 16, 2007 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport in Representative GeologicReportingEnergy3,Energy FY 09 Lab6 Report toFY7

  14. THE 10,000 YEAR PLAN

    SciTech Connect (OSTI)

    L. Srisuro

    2006-02-10T23:59:59.000Z

    Pharkya, a Ph.D. candidate in materials science and engineering, works in the area of corrosion science, predicting how materials will perform over extended periods of time. Her particular focus is a nickel-chromium-molybdenum alloy called C-22, a highly corrosion-resistant metal. Pharkya's aim is to help determine whether containers made from C-22 can be used to store high-energy nuclear waste--for 10,000 years and longer. Pharkya's work is part of a plan by the U.S. Department of Energy to consolidate the country's nuclear waste in a single proposed repository. The proposed repository is in Yucca Mountain located in a remote Nevada desert. Currently about 70,000 metric tons of spent nuclear fuel and high-level radioactive waste are divided between approximately 100 sites around the country. The undertaking, Pharkya emphasizes, is massive. To study just the corrosion aspects of the packaging, Case is collaborating with eight other universities, five national labs and Atomic Energy of Canada Limited. Even with so many players, the study will likely take several years to complete. Heading the entire group is Joe Payer, a professor of materials science and engineering at Case and Pharkya's mentor. ''I came here to have the opportunity to work with Dr. Payer, an expert in corrosion, but I didn't know specifically what I would be working on'', Pharkya recalls. ''I was pretty thrilled when I learned about the vastness of the project--my research would be just a small part of this huge topic--and the impact of the research we would be doing''.

  15. The 10,000 Year Plan

    SciTech Connect (OSTI)

    L.Srisaro

    2006-02-10T23:59:59.000Z

    Pallavi Pharkya thinks a lot about the future. Pharkya, a Ph.D. candidate in materials science and engineering, works in the area of corrosion science, predicting how materials will perform over extended periods of time. Her particular focus is a nickel-chromium-molybdenum alloy called C-22, a highly corrosion-resistant metal. Pharkya's aim is to help determine whether containers made from C-22 can be used to store high-energy nuclear waste--for 10,000 years and longer. Pharkya's work is part of a plan by the U.S. Department of Energy to consolidate the country's nuclear waste in a single proposed repository. The proposed repository is in Yucca Mountain located in a remote Nevada desert. Currently about 70,000 metric tons of spent nuclear fuel and high-level radioactive waste are divided between approximately 100 sites around the country. The undertaking, Pharkya emphasizes, is massive. To study just the corrosion aspects of the packaging, Case is collaborating with eight other universities, five national labs and Atomic Energy of Canada Limited. Even with so many players, the study will likely take several years to complete. Heading the entire group is Joe Payer, a professor of materials science and engineering at Case and Pharkya's mentor. ''I came here to have the opportunity to work with Dr. Payer, an expert in corrosion, but I didn't know specifically what I would be working on'', Pharkya recalls. ''I was pretty thrilled when I learned about the vastness of the project--my research would be just a small part of this huge topic--and the impact of the research we would be doing''.

  16. 1999 vadose zone monitoring plan and guidance for subsequent years

    SciTech Connect (OSTI)

    Horton, D.G.; Reidel, S.P.; Last, G.V.

    1998-08-01T23:59:59.000Z

    The US Department of Energy`s Hanford Site has the most diverse and largest amounts of radioactive waste in the US. The majority of the liquid waste was disposed to the soil column where much of it remains today. This document provides the rationale and general framework for vadose zone monitoring at cribs, ditches, trenches and other disposal facilities to detect new sources of contamination and track the movement of existing contamination in the vadose zone for the protection of groundwater. The document provides guidance for subsequent site-specific vadose zone monitoring plans and includes a brief description of past vadose monitoring activities (Chapter 3); the results of the Data Quality Objective process used for this plan (Chapter 4); a prioritization of liquid waste disposal sites for vadose monitoring (Chapter 5 and Appendix B); a general Monitoring and Analysis Plan (Chapter 6); a general Quality Assurance Project Plan (Appendix A), and a description of vadose monitoring activities planned for FY 1999 (Appendix C).

  17. Ten Year Site Plans | Department of Energy

    Energy Savers [EERE]

    The TYSP is integral to and supports the Department's Planning, Programming, Budgeting, and Evaluation System (PPBES). The TYSP also describes site-specific actions the...

  18. U.S. Department of Energy clean cities five-year strategic plan.

    SciTech Connect (OSTI)

    Cambridge Concord Associates

    2011-02-15T23:59:59.000Z

    Clean Cities is a government-industry partnership sponsored by the U.S. Department of Energy's (DOE) Vehicle Technologies Program, which is part of the Office of Energy Efficiency and Renewable Energy. Working with its network of about 100 local coalitions and more than 6,500 stakeholders across the country, Clean Cities delivers on its mission to reduce petroleum consumption in on-road transportation. In its work to reduce petroleum use, Clean Cities focuses on a portfolio of technologies that includes electric drive, propane, natural gas, renewable natural gas/biomethane, ethanol/E85, biodiesel/B20 and higher-level blends, fuel economy, and idle reduction. Over the past 17 years, Clean Cities coalitions have displaced more than 2.4 billion gallons of petroleum; they are on track to displace 2.5 billion gallons of gasoline per year by 2020. This Clean Cities Strategic Plan lays out an aggressive five-year agenda to help DOE Clean Cities and its network of coalitions and stakeholders accelerate the deployment of alternative fuel and advanced technology vehicles, while also expanding the supporting infrastructure to reduce petroleum use. Today, Clean Cities has a far larger opportunity to make an impact than at any time in its history because of its unprecedented $300 million allocation for community-based deployment projects from the American Recovery and Reinvestment Act (ARRA) (see box below). Moreover, the Clean Cities annual budget has risen to $25 million for FY2010 and $35 million has been requested for FY2011. Designed as a living document, this strategic plan is grounded in the understanding that priorities will change annually as evolving technical, political, economic, business, and social considerations are woven into project decisions and funding allocations. The plan does not intend to lock Clean Cities into pathways that cannot change. Instead, with technology deployment at its core, the plan serves as a guide for decision-making at both the national and local levels of Clean Cities over the next five years. The plan recognizes the need for flexibility and sets out a strategic direction that will build on the progress of current technologies and new opportunities presented in emerging fuels and technologies, such as hydrogen and fuel cells, as well as new niche markets such as off-road applications that build additional throughput at existing alternative fuel stations.

  19. One Year into President's Climate Action Plan, Finance Playing...

    Broader source: Energy.gov (indexed) [DOE]

    One Year into Presidents Climate Action Plan, Finance Playing an Important Role Peter W. Davidson Peter W. Davidson Executive Director of the Loan Programs Office (LPO) Since...

  20. Metropolitan Transportation Plan Fiscal Year 2010 - 2035

    E-Print Network [OSTI]

    Corpus Christi Metropolitan Planning Organization

    2009-12-03T23:59:59.000Z

    Approved by the Transportation Policy Committee December 3, 2009 Disclaimer Statement: The preparation of this report has been financed in part through grant[s] from the Federal Highway Administration and Federal... Transit Administration, U.S. Department of Transportation, under the State Planning and Research Program, Section 505 [or Metropolitan Planning Program, Section 104(f)] of Title 23, U.S. Code. The contents of this report do not necessarily reflect...

  1. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-12-22T23:59:59.000Z

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  2. 10 Year Transmission Plan for the Western Electricity Interconnection Released

    Broader source: Energy.gov [DOE]

    The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities.

  3. Annual Performance Plan Fiscal Year 2013

    E-Print Network [OSTI]

    Mathis, Wayne N.

    in the Smithsonian's Federal budget documents and Enterprise Resource Planning (ERP) financial accounting system next-generation technologies to explore our own solar system, meteorites, the Earth's geological past will build bridges of mutual respect, and present the diversity of world cultures and the joy of creativity

  4. Annual Performance Plan Fiscal Year 2011

    E-Print Network [OSTI]

    Mathis, Wayne N.

    with the program structure used in the Smithsonian's Federal budget documents and Enterprise Resource Planning nextgeneration technologies to explore our own solar system, meteorites, the Earth's geological past and present countries and expertise and collections that encompass the globe, we will build bridges of mutual respect

  5. Annual Performance Plan Fiscal Year 2012

    E-Print Network [OSTI]

    Mathis, Wayne N.

    with the program structure used in the Smithsonian's Federal budget documents and Enterprise Resource Planning to understand the fundamental nature of the cosmos, using nextgeneration technologies to explore our own solar and collections that encompass the globe, we will build bridges of mutual respect, and present the diversity

  6. Microsoft Word - FY2014_HAB_WorkPlan_v6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighandSWPA / SPRA / USACE SWPAURTeC:8CO 2Dances7,7,PropertyBSCFed.docFY14

  7. FY 2014-2018 DOE IRM Strategic Plan | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122Commercial602 1,39732 DOEDepartment ofFY 2007Energy 23 Summary9EnergyFYFY

  8. Small Business Award Winners - FY 2011 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Small Business Award Winners - FY 2011 Small Business Award Winners - FY 2011 Each year, the Energy Department celebrates small business advocates who have advanced the role of...

  9. WECC 10-Year Plan general presentation

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradley Nickell Director of Transmission Planning - WECC Western

  10. Martin Marietta Energy Systems Environmental Management Plan, FY 1985-1989

    SciTech Connect (OSTI)

    Furth, W.F.; Cowser, K.E.; Jones, C.G.; Mitchell, M.E.; Perry, T.P.A.; Stair, C.L.; Stinton, L.H.

    1985-05-01T23:59:59.000Z

    This plan contains the most recent revisions (as of April 1, 1985) identifying and resolving environmental problems during the next five years at the four installations managed for DOE by Martin Marietta Energy Systems, Inc. (Energy Systems). These installations are Oak Ridge National Laboratory (ORNL), Oak Ridge Gaseous Diffusion Plant (ORGDP), Oak Ridge Y-12 Plant (Y-12), and Paducah Gaseous Diffusion Plant (PGDP). The report is not an exhaustive catalogue of environmental programs for which funds will be or have been requested. The thrust is to categorize the environmental challenges by the nature of the challenge. The challenges are identified by categories: (1) radioactive waste, (2) hazardous waste, (3) co-contaminated waste (hazardous and radioactive contaminated), (4) conventional waste, (5) monitoring, and (6) remedial actions and decommissioning.

  11. FY 2010 Laboratory Table

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 2008

  12. FY 2010 Budget Highlights

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 20082 C C

  13. FY 2010 State Table

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0 ServiceState

  14. FY 2010 Statistical Table

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0

  15. FY 2010 Summary Report

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency

  16. FY 2010 Volume 3

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency8

  17. FY 2010 Volume 4

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency84

  18. FY 2010 Volume 5

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency84

  19. FY 2010 Volume 6

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency846

  20. FY 2010 Volume 7

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency8467

  1. FY 2011 Budget Highlights

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency8467A A

  2. Fiscal Year 2006 Washington Closure Hanford Science & Technology Plan

    SciTech Connect (OSTI)

    K.J. Kroegler, M. Truex, D.J. McBride

    2006-01-19T23:59:59.000Z

    This Washington Closure Hanford science and technology (S&T) plan documents the activities associated with providing S&T support to the River Corridor Closure Project for fiscal year 2006.

  3. BETO Announces Updated Multi-Year Program Plan: November 2014...

    Broader source: Energy.gov (indexed) [DOE]

    Bioenergy Technologies Office is pleased to announce the release of a newly updated Multi-Year Program Plan (MYPP). This MYPP sets forth the goals and structure of the Bioenergy...

  4. Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1990-08-01T23:59:59.000Z

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  5. Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999

    SciTech Connect (OSTI)

    Not Available

    1990-08-01T23:59:59.000Z

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  6. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double-Shell Tanks - FY 2001

    SciTech Connect (OSTI)

    JENSEN, C.E.

    2000-10-12T23:59:59.000Z

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities, plan for performance demonstration testing, and a plan for field activities. Also included are a Statement of Work for contractor performance and a protocol to be followed should tank flaws that exceed the acceptance criteria are found.

  7. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01T23:59:59.000Z

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  8. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01T23:59:59.000Z

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  9. Special initiatives FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 5.0

    SciTech Connect (OSTI)

    Jekel, R.A.

    1994-09-01T23:59:59.000Z

    The Special Initiatives mission supports programmatic requests for service to DOE offices, other organizations and agencies. These requests can include the following: Supporting priority DOE initiatives; Researching special programs; Studying locating new activities at the Hanford Site; Producing specialty materials; Providing consulting support to other sites; Managing a broad spectrum of US and international test programs.

  10. Information resources management long-range plan, FY1994--1998

    SciTech Connect (OSTI)

    Not Available

    1993-04-01T23:59:59.000Z

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements.

  11. BACHELOR OF ARTS IN BROADCAST COMMUNICATIONS (Suggested 4 Year Plan)

    E-Print Network [OSTI]

    Benos, Panayiotis "Takis"

    BACHELOR OF ARTS IN BROADCAST COMMUNICATIONS (Suggested 4 Year Plan) FIRST YEAR, 1ST TERM CREDITS English Composition I 3 GE: Mathematics (MATH 0110 recommended) 3 COMM 0102 Survey of Broadcasting 3 COMM Production 4 COMM 1302 Media Advertising OR COMM 1401 Broadcasting Programming & Management 3 Minor Course 3

  12. FY 2009 Volume Summary table

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 2008 FY3467

  13. FY 2002 Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    SciTech Connect (OSTI)

    Hartman, Mary J.; Dresel, P Evan; Lindberg, Jonathan W.; Newcomer, Darrell R.; Thornton, Edward C.

    2001-10-31T23:59:59.000Z

    This document is an integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders ("surveillance monitoring"); other, established monitoring plans by reference; and a master well/ constituent/frequency matrix for the entire Hanford Site.

  14. Environmental Management FY 2006 Budget Request DRAFT

    Broader source: Energy.gov (indexed) [DOE]

    for macro-encapsulation of higher activity MLLW from Idaho and Oak Ridge * Depleted Uranium hexafluoride conversion product (to begin in FY08) * Planning also underway for...

  15. Physics BS Sample Plan (a possible four-year plan, beginning with Calc. I)

    E-Print Network [OSTI]

    Gering, Jon C.

    Physics BS Sample Plan (a possible four-year plan, beginning with Calc. I) Course # Course Name Credits Fall #1 PHYS 145 Physics Seminar PHYS 195 Physics with Calculus I MATH 198 Calculus I LSP courses TOTAL = 15-17 Fall #2 PHYS 250 Modern Physics I PHS 275 Vibrations and Waves MATH 264 Calculus III LSP

  16. Integrated Planning: Consolidating Annual Facility Planning - More Time for Execution

    SciTech Connect (OSTI)

    Nelson, J. G.; R., L. Morton; Ramirez, C.; Morris, P. S.; McSwain, J. T.

    2011-02-02T23:59:59.000Z

    Previously, annual planning for Readiness in Technical Base and Facilities (RTBF) at the Nevada National Security Site (NNSS) was fragmented, disconnected, circular, and occurred constantly throughout the fiscal year (FY) comprising 9 of the 12 months, reducing the focus on implementation and execution. This required constant “looking back” instead of “looking forward.” In FY 2009, annual planning was consolidated into one comprehensive integrated plan (IP) for each facility/project, which comprised annual task planning/outyear budgeting, AMPs, and investment planning (i.e., TYIP). In FY 2010, the Risk Management Plans were added to the IPs. The integrated planning process achieved the following: 1) Eliminated fragmented, circular, planning and moved the plan to be more forward-looking; 2) Achieved a 90% reduction in schedule planning timeframe from 40 weeks (9 months) to 6 weeks; 3) Achieved an 80% reduction in cost from just under $1.0M to just over $200K, for a cost savings of nearly $800K (reduced combined effort from over 200 person-weeks to less than 40); 4) Reduced the number of plans generated from 21 plans (1 per facility per plan) per year to 8 plans per year (1 per facility plus 1 program-level IP); 5) Eliminated redundancy in common content between plans and improved consistency and overall quality; 6) Reduced the preparation time and cost of the FY 2010 SEP by 50% due to information provided in the IP; 7) Met the requirements for annual task planning, annual maintenance planning, ten-year investment planning, and risk management plans.

  17. The UC Berkeley Strategic Academic Plan: Five-Year Review

    E-Print Network [OSTI]

    Jacobs, Lucia

    ://www.berkeley.edu/news/media/releases/2003/05/sap/plan.pdf. A one-year review was done in 2003. This five-year review provides. Current projections indicate that the campus will enroll approximately 34,500 FTE by 2010-11, or 1 for the system over the next decade, and it is critical that Berkeley continues to play its leading role

  18. Surveillance and Maintenance Plan for the ORNL Decontamination and Decommissioning Program FY 1993--2002

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1992-07-01T23:59:59.000Z

    The Decontamination and Decommissioning (D D) Program at the Oak Ridge National Laboratory (ORNL) is part of the Department of Energy (DOE) Environmental Restoration D D program. The purpose and objectivesof this program include: (1) surveillance and maintenance (S M) of facilities awaiting decommissioning; (2) planning for the orderly decommissioning of these facilities; and (3) implementation of a program to accomplish facility disposition in a safe, cost-effective, and timely manner. Participating D D contractors are required to prepare formal plans that document the S M programs established for each site. This report has been prepared to provide this documentation for those facilities included in the ORNL D D Program.

  19. Master of Architecture Plan (180 credits) Year 1 (35 credits)

    E-Print Network [OSTI]

    Master of Architecture Plan (180 credits) Year 1 (35 credits) Fall (16 credits) Spring (19 credits) ARCH 108 Arch. Foundations I (4) ARCH 109 Arch. Foundations II (6) ARCH 103 Intro. to Architecture (3 (3) Master of Architecture conferred. General Education Electives Oral Communications/Logic: 3 hours

  20. analysis center fy: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    University of 4 Office of Planning and Analysis, FY13 Key Performance Indicators April, 2014 10,000,000 Environmental Sciences and Ecology Websites Summary: Office of Planning...

  1. Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93

    SciTech Connect (OSTI)

    Not Available

    1993-01-15T23:59:59.000Z

    The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones.

  2. Tank waste remediation system multi-year work plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  3. DynCorp Tricities Services, Inc. Hanford fire department FY 1998 annual work plan

    SciTech Connect (OSTI)

    Good, D.E.

    1997-08-19T23:59:59.000Z

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the U.S. Department of Energy operated Hanford site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. This fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This plan provides a program overview, program baselines, and schedule baseline.

  4. Surveillance and Maintenance Plan for the ORNL Decontamination and Decommissioning Program FY 1993--2002

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1992-07-01T23:59:59.000Z

    The Decontamination and Decommissioning (D&D) Program at the Oak Ridge National Laboratory (ORNL) is part of the Department of Energy (DOE) Environmental Restoration D&D program. The purpose and objectivesof this program include: (1) surveillance and maintenance (S&M) of facilities awaiting decommissioning; (2) planning for the orderly decommissioning of these facilities; and (3) implementation of a program to accomplish facility disposition in a safe, cost-effective, and timely manner. Participating D&D contractors are required to prepare formal plans that document the S&M programs established for each site. This report has been prepared to provide this documentation for those facilities included in the ORNL D&D Program.

  5. NASA/DOE/DOD nuclear propulsion technology planning: Summary of FY 1991 interagency panel results

    SciTech Connect (OSTI)

    Clark, J.S.; Wickenheiser, T.J.; Doherty, M.P.; Marshall, A.; Bhattacharryya, S.K.; Warren, J.

    1992-01-01T23:59:59.000Z

    Interagency (NASA/DOE/DOD) technical panels worked in 1991 to evaluate critical nuclear propulsion issues, compare nuclear propulsion concepts for a manned Mars mission on a consistent basis, and to continue planning a technology development project for the Space Exploration Initiative (SEI). Panels were formed to address mission analysis, nuclear facilities, safety policy, nuclear fuels and materials, nuclear electric propulsion technology, and nuclear thermal propulsion technology. A summary of the results and recommendations of the panels is presented.

  6. Heavy vehicle hybrid propulsion systems R and D program plan, FY 2000-2005

    SciTech Connect (OSTI)

    None

    2000-07-01T23:59:59.000Z

    This report contains the program plan and background information for the Heavy Vehicle Hybrid Propulsion R and D Program sponsored by the Department of Energy's Office of Heavy Vehicle Technologies. The program is a collaboration between industry and government established for the development of advanced hybrid-electric propulsion technology for urban cycle trucks and buses. It targets specific applications to enhance potential market success. Potential end-users are also involved.

  7. Proposed State Budget FY09/FY10

    E-Print Network [OSTI]

    Bieber, Michael

    #12;Proposed State Budget · FY09/FY10 o$33 billion budget established July 1, 2008 oFY10;Proposed State Budget Impact on NJIT · FY09 impact o $850,000 revenue reduction in salary program funds o in receiving 25% of computed salary program o Tentatively covered by budgeted reserve and FY09 vacancies · FY10

  8. 2033 Long Range Transportation Plan and FY 2010-2013 Transportation Improvement Program

    E-Print Network [OSTI]

    The West-Memphis Metropolitan Planning Organization

    was adopted in June 2005 by the MPO and prepared under the guidelines of the Transportation Equity Act for the 21st Century (TEA-21). The 2033 LRP reaffirms the basic issues and goals of the previous plans while considering additional matters of concern.... The two landmark bills that brought surface transportation into the 21 st century?the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) and the Transportation Equity Act for the 21 st Century (TEA-21)?shaped the highway program to meet...

  9. Environmental Restoration Projects FY10 Performance

    E-Print Network [OSTI]

    Homes, Christopher C.

    Pollution Prevention Safety Performance Looking forward: FY11 Goals and Objectives 2 #12;3 FY Planning Plan (Dec) #12;7 ERP Environmental Aspects Radioactive, Hazardous, Mixed & Regulated Industrial Waste or Radioactive Materials Historical/Cultural Resources #12;ERP Work Hazards: OSHA's "Top Ten" Construction Safety

  10. Program status. 2nd quarter - FY 1995. Confinement systems programs

    SciTech Connect (OSTI)

    NONE

    1995-04-18T23:59:59.000Z

    We conducted physics experiments: record normalized {Beta} = 4.9 achieved in VH-mode, {Beta} limits of ITER-like configurations evaluated, FWCD commissioning. The tokamak vessel was opened to atmosphere for six weeks and a number of key diagnostics for understanding the divertor were installed. The DIII-D Advisory Committee met in January to review the DIII-D program and plan. They commended us for recent progress and supported the vanadium divertor design. The U.S./Japan DIII-D steering committee met and recommended extending the agreement to the year 2000. The field work proposal for FY 96/97 was presented in Washington on March 29, 1995. A review of the DIII-D plan to install vanadium structural components as part of the new radiative divertor modification was held in Washington 31, 1995 and the panel endorsed the plans. Preliminary plans were developed with PPPL for collaborations in FY96,

  11. 100-D Area In Situ Redox Treatability Test for Chromate-Contaminated Groundwater: FY 1998 Year-End Report

    SciTech Connect (OSTI)

    Williams, M.D.; Vermeul, V.R.; Szecsody, J.E.; Fruchter, J.S.; Cole, C.R.

    1999-04-15T23:59:59.000Z

    A treatability test was conducted for the In Situ Redox Manipulation (ISRM) technology at the US Department of Energy's Hanford, Washington 100D Area. The target contaminant was dissolved chromate [Cr(VI)] in groundwater. The ISRM technology involves creating a permeable subsurface treatment zone to reduce mobile chromate in groundwater to an insoluble form. The ISRM permeable treatment zone is created by reducing ferric iron [Fe(III)] to ferrous iron [Fe(II)] within the aquifer sediments. This is accomplished by injecting aqueous sodium dithionite into the aquifer and withdrawing the reaction products. The goal of the treatability test was to create a linear ISRM barrier by injecting sodium dithionite into five wells. Well installation and site characterization activities began in the spring of 1997. The first dithionite injection took place in September 1997. The results of this first injection were monitored through the spring of 1998; the remaining four dithionite injections were carried out in May through July of 1998. These five injections created a reduced zone in the Hanford unconfined aquifer 150 feet in length (perpendicular to groundwater flow) by 50 feet wide. The reduced zone extended over the thickness of the unconfined zone, which is approximately 15 feet. Analysis of recent groundwater sampling events shows that the concentrations of chromate [Cr(VI)] in groundwater in the reduced zone have been decreased from starting concentrations of approximately 900 ppb to below analytical detection limits (<7 ppb). Chromate concentrations are also declining in some downgradient monitoring wells. Laboratory analysis of iron in the soil indicates that the barrier should remain in place for approximately 20 to 25 years. These measurements will be confirmed by analysis of sediment cores in FY 1999.

  12. Safeguards and Security FY 1996 Program Plan: WBS 6.6

    SciTech Connect (OSTI)

    Lee, F.D.

    1995-08-01T23:59:59.000Z

    The Safeguards and Security (SAS) Program is based upon integrity, competence and innovation in the protection of the public and Hanford resources through: (1) outstanding assistance, oversight, education, and counsel to their customers to ensure the protection of the public, site personnel, assets, and information; (2) value-added and cost-effective solutions to Hanford issues; and (3) risk management techniques to ensure effective asset protection, site accessibility, and the flexibility to adapt to changing customer needs. This plan is divided into two parts: overview and SAS WBS (work breakdown structure) dictionary sheets. The overview is divided into vision and mission, goals and objectives, assumptions and priorities, milestones, and a summary. The SAS WBS dictionary sheets are divided into department overhead, general and administrative, sitewide support, Hanford patrol, traffic safety, and locksmith services.

  13. FY 2008 Volume 1

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current

  14. FY 2008 Volume 2

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current2 DOE/CF-015

  15. FY 2008 Volume 3

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current2 DOE/CF-0153

  16. FY 2008 Volume 4

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current2 DOE/CF-01534

  17. FY 2008 Volume 5

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current2 DOE/CF-015345

  18. FY 2008 Volume 6

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current2

  19. FY 2008 Volume 7

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current27 DOE/CF-020

  20. FY 2009 Budget Highlights

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current27

  1. FY 2009 State Table

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State Tables

  2. FY 2009 Statistical Table

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State TablesStatistical

  3. FY 2009 Summary Report

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State TablesStatistical

  4. FY 2011 Laboratory Table

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State71Laboratory

  5. FY 2011 State Table

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State71Laboratory1State

  6. Fire-Protection Research for Energy-Technology Projects: FY 1981 year-end report

    SciTech Connect (OSTI)

    Hasegawa, H.K.; Alvares, N.J.; Lipska-Quinn, A.E.; Beason, D.G.; Foote, K.L.; Priante, S.J.

    1982-07-20T23:59:59.000Z

    This report summarizes research conducted in fiscal year 1981 for the DOE-supported project, Fire Protection Research for Energy Technology Projects. Initiated in 1977, this ongoing research program was conceived to advance fire protection strategies for Energy Technology Projects to keep abreast of the unique fire problems that are developing with the complexity of energy technology research. We are developing an analytical methodology through detailed study of fusion energy experiments at Lawrence Livermore National Laboratory (LLNL). Employing these facilities as models for methodology development, we are simultaneously advancing three major task areas: (1) determination of unique fire hazards of current fusion energy facilities; (2) evaluation of the ability of accepted fire management measures to meet and negate hazards; and (3) performance of unique research into problem areas we have identified to provide input into analytical fire-growth and damage-assessment models.

  7. Hanford fire department FY 99 annual work plan WBS 6.5.7

    SciTech Connect (OSTI)

    GOOD, D.E.

    1999-02-24T23:59:59.000Z

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing a full range of services at the lowest possible cost to customers. These services include fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, the general public, or interest of the U. S. Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. The fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education.

  8. FY 2007 Operating Plan for DOE--March 16, 2007.xls | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAMDepartmentofof EnergyOverview46 Report7

  9. FY 2012 Annual Workforce Analysis and Staffing Plan Report - NNSA NSO

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAMDepartmentofofForeword he ReportsHawaiiNevada

  10. Hanford Site Environment Safety and Health (ES and H) FY 1999 and FY 2000 Execution Commitment Summary

    SciTech Connect (OSTI)

    REEP, I.E.

    1999-12-01T23:59:59.000Z

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the S&H resources that support these activities. The fiscal year (FY) 1999 and 2000 information (Sieracki 1999) and data contained in the ''Hanford Site Environment, Safety and Health Fiscal Year 2001 Budget-Risk Management Summary'' (RL 1999) were the basis for preparing this report. Fiscal year 2000 finding of Office of Environmental Management (EM) and Office of Nuclear Energy, Science and Technology (NE) activities is based on the President's budget of $1,065.1 million and $28.0 million, plus $2.7 million carryover finding, respectively, as of October 31, 1999. Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2002 ES&H Budget-Risk Management Summary to be issued in May 2000. This report provides the end-of-year status of FY 1999 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2000 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H ''Guidance for FY200l Budget Formulations and Execution'' (DOE 1999).

  11. The RHIC Mid-Term Strategic Plan Status as of February 2008

    E-Print Network [OSTI]

    construction in FY 2010, a one-year delay from the schedule shown in the Mid-Term plan. As a result on February 14, 2006. The document can be found at: http://www.bnl.gov/npp/docs/RHICpl

  12. Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report

    SciTech Connect (OSTI)

    Will Lewis, Compiler

    2006-09-01T23:59:59.000Z

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did an exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.

  13. FY 2015 NNSA/NFO Ten-Year Site Plan Limited Report

    National Nuclear Security Administration (NNSA)

    objectives through innovative and effective programs and projects that increase energy, water and fleet efficiency and reduce greenhouse gases, pollution, and waste. The...

  14. HAMMER FY 1999 multi-year work plan WBS 1.9

    SciTech Connect (OSTI)

    Callender, P.A.

    1998-09-30T23:59:59.000Z

    As a federal training center HAMMER`s [HAzardous Materials Management and Emergency Response] mission is to host, broker, and provide training with partners, involving hands-on use of realistic props and settings, in order to save lives and reduce injuries, increase worker productivity, and serve as a catalyst for a regional training industry.

  15. Concurrence' Lawrence Livermore National Laboratory FY2015 Ten Year Site Plan

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTubahq.na.gov Office of theNuclearNanotechnologies |March 2015 NMMSS News

  16. FY 2015 NNSA/NFO Ten-Year Site Plan Limited Report

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTubahq.na.gov Office ofDepartment ofr EEONuclear NEWS MEDIA CONTACT: FOR5

  17. FY 2010 Annual Performance Report

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 20082 C C O O

  18. FY 2011 Agency Performance Report

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency8467A A

  19. FTCP Annual Plan - Fiscal Year 2005 | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAM FLASH2011-17-OPAMFTCP Annual Plan - Fiscal

  20. Geothermal-subsidence research program plan and review

    SciTech Connect (OSTI)

    Goldstein, N.E.; Noble, J.E.; Simkin, T.L.

    1980-09-01T23:59:59.000Z

    The revised Geothermal Subsidence Research Plan (GSRP) presented here is the result of two years of research based on the recommendations of a technical advisory committee and on the DOE/DGE's wish to include specific components applicable to the geopressure resources on the Gulf Coast. This revised plan describes events leading up to FY 1979 and 1980 and the resulting research activities completed for that period. At the time of this writing most of the projects are completed; this document summarizes the accomplishments of the GSRP during FY 1979 and 1980 and includes recommendations for the FY 1981 and 1982 programs.

  1. Human Capital Management Plan Fiscal Years 2003- 2010

    SciTech Connect (OSTI)

    none,

    2000-03-09T23:59:59.000Z

    Western, like many other Federal agencies, will face significant and challenging human capital issues in the next decade. The Federal workforce is aging; baby boomers, with their valuable skills and experience, are drawing nearer to retirement and new employees joining the Federal workforce today have different career expectations from the generation that preceded them. The average age of Western’s workforce is approaching 48. Almost a third of the workforce is between 50 and 54 years and most will be eligible to retire in five years. Western has almost twice as many employees who are 55 and older as it has who are 35 and younger. As the workforce ages, the proportion of younger workers is shrinking. The U.S. Census Bureau says you can expect these developments for the next 20 years. The 45 to 65 year-old work group will grow by 54 percent but the 18 to 44 population will rise by only 4 percent. According to the Bureau of Labor Statistics workers age 25 to 44 will decline by 3 million, dropping from 51 percent of the labor force in 1998 to 44 percent in 2008. Western employees who will retire include highly skilled workers in fields such as information technology, engineering, and craft occupations. Deregulation of the electric utility industry and the establishment of regional transmission organizations and independent system operators are also demanding new and different skill mixes than those currently available in Western. Changes in workforce demographic, in the education and skills that will be required in the future, and an increasingly competitive job market, will require flexible and responsive human capital tools to attract and retain talented employees. These trends were the reason for a comprehensive review of Western’s human capital programs to determine its readiness for the future. In July 2001, a team of managers conducted a comprehensive assessment of Western’s human capital needs. The team used the assessment to draft a framework that addresses the most critical human capital challenges in Western. Comments on the draft plan were then solicited from Western’s EEO committees and managers and supervisors. The framework outlines seven initiatives for implementation: 1) Develop a human capital plan linked to Western’s strategic goals. 2) Develop and implement a Westernwide workforce planning program. 3) Establish a succession planning program. 4) Create and foster a workplace environment that will attract and retain talented employees. 5) Establish a Western-wide recruitment program. 6) Develop a training program on human capital management for managers and supervisors. 7) Develop pay options for improving the link between pay and performance. Our goal in developing this plan is to help Western achieve its mission to be a premier power marketing and transmission organization. This plan serves as a first step in addressing Western’s human capital issues in the next decade.

  2. FY 2009 Summary Table by Organization

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 2008 FY 2009

  3. FY 2010 Summary Table by Appropriation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency8 FY

  4. FY 2010 Summary Table by Organization

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency8 FY8

  5. Major Efforts 2010-2015 Strategic Plan

    E-Print Network [OSTI]

    Bieber, Michael

    pay syste o acu ty · FY12 OMB submission and FY12 budget planning · Enrollment planning #12;#12;Major Efforts · 2010-2015 Strategic Plan · Trustees approved at Sep meeting · http

  6. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01T23:59:59.000Z

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  7. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01T23:59:59.000Z

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  8. Message from Hugh Montgomery: Call for FY16 LDRD Proposals |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Message from Hugh Montgomery: Call for FY16 LDRD Proposals An important element of Jefferson Lab's Strategic Plan is the implementation of a Laboratory Directed Research and...

  9. FY 2008FY 2008FY 2012 U.S. Department of Health and Human Services National Institutes of Health

    E-Print Network [OSTI]

    Bandettini, Peter A.

    Table of Contents The Year in Review 1 The Four Intramural Loan Repayment Programs 2 Applications Institutes of Health The Year in Review In Fiscal Year (FY) 2012, 92 individuals applied to the Intramural

  10. FY 2008FY 2008FY 2010 U.S. Department of Health and Human Services National Institutes of Health

    E-Print Network [OSTI]

    Bandettini, Peter A.

    ­ National Institutes of Health NIH Intramural Loan Repayment Programs Table of Contents The Year in Review 1 Repayment Programs The Year in Review In Fiscal Year (FY) 2010, 96 individuals applied to the Intramural

  11. YEAR

    National Nuclear Security Administration (NNSA)

    1 YEAR 2014 Males 48 Females 33 PAY PLAN YEAR 2014 SES 1 EJEK 8 EN 04 10 EN 03 1 NN (Engineering) 27 NQ (ProfTechAdmin) 29 NU (TechAdmin Support) 5 YEAR 2014 American Indian...

  12. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2014 Males 18 Females 10 PAY PLAN YEAR 2014 SES 1 EN 05 1 EN 04 4 NN (Engineering) 12 NQ (ProfTechAdmin) 9 NU (TechAdmin Support) 1 YEAR 2014 American Indian Alaska...

  13. YEAR

    National Nuclear Security Administration (NNSA)

    5 YEAR 2014 Males 61 Females 24 PAY PLAN YEAR 2014 SES 1 EJEK 8 EN 04 22 NN (Engineering) 23 NQ (ProfTechAdmin) 28 NU (TechAdmin Support) 3 YEAR 2014 American Indian Alaska...

  14. NREL Photovoltaic Program FY 1996 Annual Report

    SciTech Connect (OSTI)

    Not Available

    1997-08-01T23:59:59.000Z

    This report summarizes the in-house and subcontract research and development (R&D) activities under the National Renewable Energy Laboratory (NREL) Photovoltaics (PV) Program from October 1, 1995 through September 30, 1996 (fiscal year [FY] 1996). The NREL PV Program is part of the U.S. Department of Energy's (DOE) National Photovoltaics Program, as described in the DOE Photovoltaics Program Plan, FY 1991 - FY 1995. The mission of the DOE National Photovoltaics Program is to: "Work in partnership with U.S. industry to develop and deploy photovoltaic technology for generating economically competitive electric power, making photovoltaics an important contributor to the nation's and the world's energy use and environmental improvement. The two primary goals of the national program are to (1) maintain the U.S. PV industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NREL PV Program provides leadership and support to the national program toward achieving its mission and goals.

  15. Savannah River Site's Site Specific Plan

    SciTech Connect (OSTI)

    Not Available

    1991-08-01T23:59:59.000Z

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  16. EIS-0005-S2: Bonneville Power Administration Proposed FY 1979 Program Facility Planning Supplement Southwest Oregon Area Service, Supplemental

    Broader source: Energy.gov [DOE]

    This statement, one of a series prepared by the U.S. Department of Energy’s Bonneville Power Administration on various facets of its construction and maintenance activities, addresses the potential impact of a major new facility proposed for fiscal year 1979. To allow power generated in Wyoming to be delivered to Southwest Oregon and to facilitate the exchange of electric power between the Pacific Northwest and the Middle Snake region, two basic plans of service, each with two corridor routing options, have been identified to meet system requirements. BPA proposes construction of the following two transmission facilities: (1) a 500-kV line from Idaho Power Company's Brownlee Substation in Idaho to BPA's Slatt Substation near Arlington, Oregon, and (2) a 500-kV line from Buckley (near Maupin, Oregon) to Malin, Oregon. This statement must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report (The ""Role EIS""), particularly Appendix B - BPA Power Transmission.

  17. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  18. FY 2015 Summary Control Table by Appropriation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary Control Table by Appropriation (dollars in thousands - OMB Scoring) Summary Control Table by Appropriation Page 1 FY 2015 Congressional Request FY 2013 FY 2014 FY 2014 FY...

  19. Laboratory Directed Research and Development Program FY2011

    SciTech Connect (OSTI)

    none, none

    2012-04-27T23:59:59.000Z

    Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports the Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.

  20. General Counsel`s Office FY 1996 Site Support Program Plan: WBS 6.10.5. Revision 1

    SciTech Connect (OSTI)

    Moreno, S.R.

    1995-09-01T23:59:59.000Z

    This is the General Counsel`s Office site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, description of activities, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail.

  1. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2005-09-26T23:59:59.000Z

    This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

  2. YEAR

    National Nuclear Security Administration (NNSA)

    2014 Males 81 Females 45 PAY PLAN YEAR 2014 SES 1 SL 1 EJEK 25 EN 04 26 EN 03 2 NN (Engineering) 23 NQ (ProfTechAdmin) 44 NU (TechAdmin Support) 4 YEAR 2014 American Indian...

  3. Ecohydrological Planning for The Woodlands: Lessons Learned After 35 Years

    E-Print Network [OSTI]

    Yang, Bo

    2010-10-12T23:59:59.000Z

    & Technology; M. Arch., Huazhong University of Science & Technology Co-Chairs of Advisory Committee: Dr. Chang-Shan Huang Dr. Ming-Han Li The Woodlands, Texas, is a 27,000-acre new town created with Ian McHarg?s ecohydrological planning approach..., was severely flooded in both events. For the past three decades, very few studies have been conducted to assess the effectiveness of McHarg?s planning approach. The objective of this study is three fold: (1) To document McHarg?s ecohydrological planning...

  4. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    SciTech Connect (OSTI)

    Not Available

    1993-03-01T23:59:59.000Z

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

  5. Oak Ridge National Laboratory Health and Safety Long-Range Plan: Fiscal years 1989--1995

    SciTech Connect (OSTI)

    Not Available

    1989-06-01T23:59:59.000Z

    The health and safety of its personnel is the first concern of ORNL and its management. The ORNL Health and Safety Program has the responsibility for ensuring the health and safety of all individuals assigned to ORNL activities. This document outlines the principal aspects of the ORNL Health and Safety Long-Range Plan and provides a framework for management use in the future development of the health and safety program. Each section of this document is dedicated to one of the health and safety functions (i.e., health physics, industrial hygiene, occupational medicine, industrial safety, nuclear criticality safety, nuclear facility safety, transportation safety, fire protection, and emergency preparedness). Each section includes functional mission and objectives, program requirements and status, a summary of program needs, and program data and funding summary. Highlights of FY 1988 are included.

  6. GEORGE MASON UNIVERSITY FY 2005-06 and FY 2010-11

    E-Print Network [OSTI]

    GEORGE MASON UNIVERSITY Comparison FY 2005-06 and FY 2010-11 2005-06 2010-11 Students Enrollment 29 portfolio since the 2005-06 academic year: o Computer game design (BFA) o Global and environmental change 168 Since the 2005-06 academic year, Mason has opened nearly 30 new facilities. Below is a sample

  7. Institutional plan: Supplements, FY 1998--FY 2003

    SciTech Connect (OSTI)

    NONE

    1997-07-01T23:59:59.000Z

    This supplement contains summaries of the projects, both DOE and non-DOE, that the Argonne National Laboratory conducts. DOE projects include nuclear energy, energy research, energy efficiency, fossil energy, defense programs, non-proliferation and national security, environmental management, and civilian radioactive waste management. The second part of this report contains descriptions of the Argonne National Lab site and facilities. Budget information is also presented.

  8. Institutional plan FY 1999--FY 2004

    SciTech Connect (OSTI)

    NONE

    1998-10-01T23:59:59.000Z

    Los Alamos has a well-defined and nationally important mission: to reduce the global nuclear danger. This central national security mission consists of four main elements: stockpile stewardship, nuclear materials management, nonproliferation and arms control, and cleanup of the environmental legacy of nuclear weapons activities. The Laboratory provides support for and ensures confidence in the nation`s nuclear stockpile without nuclear testing. This challenge requires the Laboratory to continually hone its scientific acumen and technological capabilities to perform this task reliably using an interdisciplinary approach and advanced experimental and modeling techniques. In the last two National Defense Authorization Acts, Congress identified the need to protect the nation from the proliferation of weapons of mass destruction, which includes nuclear, chemical, and biological weapons, and their potential use by terrorists. Los Alamos is applying multidisciplinary science and engineering skills to address these problems. In addition, the Laboratory`s critical programmatic roles in stockpile stewardship and threat reduction are complemented by its waste management operations and environmental restoration work. Information on specific programs is available in Section 2 of this document.

  9. Sustainability Plan FY 2011 FY 2020

    E-Print Network [OSTI]

    US Army Corps of Engineers

    ..................................................................22 Vf. Climate Change Risk and Vulnerability....................................................................................................................................14 IVa. Internal Coordination and Communication...................................................................................................................................................23 VIa. Internal USACE Communication on the Requirements of and Progress on EO 13514.....23 VIb

  10. Tanks Focus Area Site Needs Assessment - FY 2001

    SciTech Connect (OSTI)

    Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.; Nickola, Cheryl L.

    2001-04-30T23:59:59.000Z

    The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, from collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.

  11. FY 2009 Annual Performance Report

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current27 DOE/CF-020

  12. Richland Operations (DOE-RL) Environmental Safety Health (ES and H) FY 2000 and FY 2001 Execution Commitment Summary

    SciTech Connect (OSTI)

    REEP, I.E.

    2000-12-01T23:59:59.000Z

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the Safety and Health (S&H) resources that support these activities. The fiscal year (FY) 2000 and 2001 information and data contained in the Richland Operations Environment, Safefy and Health Fiscal Year 2002 Budget-Risk Management Summary (RL 2000a) were the basis for preparing this report. Fiscal year 2001 activities are based on the President's Amended Congressional Budget Request of $689.6 million for funding Ofice of Environmental Management (EM) $44.0 million for Fast Flux Test Facility standby less $7.0 million in anticipated DOE, Headquarters holdbacks for Office of Nuclear Energy, Science and Technology (NE); and $55.3 million for Safeguards and Security (SAS). Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2003 ES&H Budget-Risk Management Summary to be issued in May 2001. This report provides the end-of-year status of FY 2000 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2001 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H guidance contained in the FY 2002 Field Budget Call (DOE 2000).

  13. Department of Materials Science and Engineering Four Year Plan (201213 Catalog, ready for calculus)

    E-Print Network [OSTI]

    Barrash, Warren

    Department of Materials Science and Engineering Four Year Plan (201213 Catalog, ready Mechanical Behavior of Materials 3 ENGR 210 Statics 3 MSE 380 Materials Science and Engineering Lab 2 MATH by the student's advisor. #12;Department of Materials Science and Engineering Four Year Plan (201213

  14. Five-Year Master Plan University of Michigan-Ann Arbor

    E-Print Network [OSTI]

    Kamat, Vineet R.

    Five-Year Master Plan University of Michigan-Ann Arbor Prepared by: University of Michigan-Ann Arbor Facilities and Operations October 31, 2014 #12;FIVE-YEAR MASTER PLAN UNIVERSITY OF MICHIGAN of Contents 1 #12;Section I Mission Statement #12;MISSION STATEMENT The mission of the University of Michigan

  15. Five-Year MD Enrichment Program Application/Plan University of Connecticut School of Medicine

    E-Print Network [OSTI]

    Oliver, Douglas L.

    Five-Year MD Enrichment Program Application/Plan University of Connecticut School of Medicine Full_________________________________ Proposed graduation date_________________________ Outline of enrichment plan: (specify date)____________ Please detail on a month-to- month basis your enrichment program (Be specific): Academic Year

  16. Being Relevant in Tough Times: TRIUMF's Five-Year Plan

    ScienceCinema (OSTI)

    Tim Meyer

    2010-01-08T23:59:59.000Z

    Perhaps better known to the international community than its own neighbors, TRIUMF is Canada's national laboratory for particle and nuclear physics.  Working with the Canadian scientific community, TRIUMF has formulated a new vision to transform the laboratory and deliver a whole new level of performance and impact.  The plan capitalizes on platform technologies (superconducting RF cavities for accelerator physics and radiotracers in nuclear medicine) and exploits Canada's role in ATLAS and the LHC.  I will describe the key elements of the plan and discuss the science-policy landscape in which TRIUMF must make its case.

  17. Generation IV Nuclear Energy Systems Ten-Year Program Plan Fiscal Year 2005, Volume 1

    SciTech Connect (OSTI)

    None

    2005-03-01T23:59:59.000Z

    As reflected in the U.S. ''National Energy Policy'', nuclear energy has a strong role to play in satisfying our nation's future energy security and environmental quality needs. The desirable environmental, economic, and sustainability attributes of nuclear energy give it a cornerstone position, not only in the U.S. energy portfolio, but also in the world's future energy portfolio. Accordingly, on September 20, 2002, U.S. Energy Secretary Spencer Abraham announced that, ''The United States and nine other countries have agreed to develop six Generation IV nuclear energy concepts''. The Secretary also noted that the systems are expected to ''represent significant advances in economics, safety, reliability, proliferation resistance, and waste minimization''. The six systems and their broad, worldwide research and development (R&D) needs are described in ''A Technology Roadmap for Generation IV Nuclear Energy Systems'' (hereafter referred to as the Generation IV Roadmap). The first 10 years of required U.S. R&D contributions to achieve the goals described in the Generation IV Roadmap are outlined in this Program Plan.

  18. FY 2007 Volume 1

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment ofAppropriationBudget DOE:5 FY

  19. FY 2007 Volume 2

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment ofAppropriationBudget DOE:5 FY2

  20. FY 2007 Volume 3

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment ofAppropriationBudget DOE:5 FY23

  1. FY 2007 Volume 4

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment ofAppropriationBudget DOE:5 FY234

  2. FY 2007 Volume 5

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment ofAppropriationBudget DOE:5 FY2345

  3. FY 2007 Volume 6

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment ofAppropriationBudget DOE:5 FY23456

  4. FY 2007 Volume 7

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment ofAppropriationBudget DOE:5 FY234567

  5. FY 2011 Volume 1

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And WaterNationalS S1

  6. FY 2011 Volume 2

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And WaterNationalS

  7. FY 2011 Volume 4

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And WaterNationalS4

  8. FY 2011 Volume 5

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And WaterNationalS4

  9. FY 2012 Budget Highlights

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And WaterNationalS44

  10. FY 2012 Laboratory Table

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And2 Federal Office5

  11. FY 2012 State Table

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And2 Federal

  12. FY 2012 Statistical Table

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And2

  13. FY 2012 Volume 1

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And26 Department of57

  14. FY 2012 Volume 2

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And26 Department

  15. FY 2012 Volume 3

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And26 Department

  16. FY 2012 Volume 4

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And26 Department0

  17. FY 2012 Volume 5

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And26 Department0

  18. FY 2012 Volume 6

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And26 Department02

  19. FY 2012 Volume 7

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And26 Department023

  20. FY 2010 Control Table by Appropriation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 20082 C

  1. FY 2010 Control Table by Organization

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 20082 C0

  2. FY 2010 LDRD Report | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY

  3. FY 2010 Service Contract Inventory Analysis

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0 Service

  4. FY 2015 Appropriations Hearing | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007FY 2014 Solid Oxide FuelFY 2015

  5. Coal Power Systems strategic multi-year program plans

    SciTech Connect (OSTI)

    None

    2001-02-01T23:59:59.000Z

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  6. Hanford Surplus Facilities Program plan, Fiscal year 1991

    SciTech Connect (OSTI)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1990-09-01T23:59:59.000Z

    The Hanford Surplus Facilities Program is responsible for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The management of these facilities requires a surveillance and maintenance program to keep them in a safe condition and development of a plan for ultimate disposition. Criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy-Richland Operations Office, Environmental Restoration Division, and are consistent with the Westinghouse Hanford Company commitment to decommission the Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities to the end of disposition. 12 refs., 2 figs., 4 tabs.

  7. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    SciTech Connect (OSTI)

    Naidu, J.R.; Paquette, D.; Lee, R. [and others

    1996-10-01T23:59:59.000Z

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

  8. Transition projects FY 1995 multi-year program plan/fiscal year work plan WBS 1.3.1. and 7.1

    SciTech Connect (OSTI)

    Cartmell, D.B.

    1994-09-01T23:59:59.000Z

    This document presents a complete listing and time line of transitional projects associated with the Purex/UO3 deactivation project at the Hanford reservation.

  9. YEAR

    National Nuclear Security Administration (NNSA)

    3 YEAR 2014 Males 59 Females 24 PAY PLAN YEAR 2014 SES 1 EJEK 4 EN 05 3 EN 04 22 EN 03 8 NN (Engineering) 15 NQ (ProfTechAdmin) 27 NU (TechAdmin Support) 3 YEAR 2014 American...

  10. FY 2006 Executive Order 13101 Report: Department of Energy Affirmative...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2006 Executive Order 13101 Report: Department of Energy Affirmative Procurement and Recycling Fiscal Year 2006 Report, 31207 FY 2006 Executive Order 13101 Report: Department of...

  11. SOLID WASTE INTEGRATED FORECAST TECHNICAL (SWIFT) REPORT FY2003 THRU FY2046 VERSION 2003.1 VOLUME 2 [SEC 1 & 2

    SciTech Connect (OSTI)

    BARCOT, R.A.

    2003-12-01T23:59:59.000Z

    This report includes data requested on September 10, 2002 and includes radioactive solid waste forecasting updates through December 31, 2002. The FY2003.0 request is the primary forecast for fiscal year FY 2003.

  12. Bioenergy Technologies Office Multi-Year Program Plan: March...

    Energy Savers [EERE]

    over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as...

  13. FTCP Annual Plan - Fiscal Year 2005 | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAM FLASH2011-16-OPAMYoung,02,

  14. EM-21 Multi-Year Program Plan Prioritization Process

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department ofNotices |Notice of38:3:1:EMOperations | (8-89) EFG

  15. FY 2015 Summary Control Table by Organization

    Energy Savers [EERE]

    5 Summary Control Table by Organization (dollars in thousands - OMB Scoring) Summary Control by Organization Page 1 FY 2015 Congressional Request FY 2013 FY 2014 FY 2014 FY 2014 FY...

  16. National Aeronautics and Space Administration NASA's FY 2015 Management and Performance

    E-Print Network [OSTI]

    Waliser, Duane E.

    TO PERFORMANCE MANAGEMENT conduct the Agency's day-to-day work. Figure 1 depicts NASA's organizational structure National Aeronautics and Space Administration NASA's FY 2015 Management and Performance Governance and Strategic Management Management Priorities and Challenges FY 2014 Performance Plan Update FY

  17. Program mid-year summaries research, development, demonstration, testing and evaluation: Office of Technology Development, FY 1993

    SciTech Connect (OSTI)

    Not Available

    1993-10-01T23:59:59.000Z

    This mid-year review provides a summary of activities within the Office of Technology Development with individual presentations being made to DOE HQ and field management staff. The presentations are by EM-541, 542, 551, and 552 organizations.

  18. Alternative fuel vehicles for the state fleets: Results of the 5-year planning process

    SciTech Connect (OSTI)

    Not Available

    1993-05-01T23:59:59.000Z

    This report documents the first attempt by the Department of Energy (DOE) to work with states to prepare five-year Alternative Fuel Vehicle (AFV) acquisition plans to identify alternative fuels and vehicles that they are planning on or would like to acquire. The DOE Regional Support Offices (RSOs) met with representatives from the states in their regions and assisted in the preparation of the plans. These plans will be used in conjunction with previously gathered Federal five-year plans to encourage Original Equipment Manufacturers (OEMs) to expand the variety of AFVs produced, reduce the incremental cost of AFVs, and to encourage fuel suppliers to expand the alternative fuel infrastructure and alternative fuel availability. By identifying the needs and requirements of state fleets, DOE can begin to describe the specific nature of the future state fleets, and establish a defined market for OEMs and fuel suppliers. DOE initiated the development and collection of the state five-year plans before the signing of the Energy Policy Act, to raise the awareness of states that they will be required by law to acquire AFVs. As a result, several states that had no AFV acquisition plan when queried have developed or are in the process of developing plans. The DOE and its RSOs are still working with the states to develop and refine acquisition plans, and this report should be treated as documentation of work in progress.

  19. Photovoltaic Subcontract Program, FY 1990

    SciTech Connect (OSTI)

    Summers, K.A. (ed.)

    1991-03-01T23:59:59.000Z

    This report summarizes the progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaics Program at the Solar Energy Research Institute (SERI). The SERI subcontracted PV research and development represents most of the subcontracted R D that is funded by the US Department of Energy (DOE) National Photovoltaics Program. This report covers fiscal year (FY) 1990: October 1, 1989 through September 30, 1990. During FY 1990, the SERI PV program started to implement a new DOE subcontract initiative, entitled the Photovoltaic Manufacturing Technology (PVMaT) Project.'' Excluding (PVMaT) because it was in a start-up phase, in FY 1990 there were 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of those subcontracts were with universities, at a total funding of over $3.3 million. Cost sharing by industry added another $4.3 million to that $11.9 million of SERI PV subcontracted R D. The six technical sections of this report cover the previously ongoing areas of the subcontracted program: the Amorphous Silicon Research Project, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs discuss approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports the progress since its inception in FY 1990. Highlights of technology transfer activities are also reported.

  20. 5-9035-01-P4 4-YEAR PAVEMENT MANAGEMENT PLAN (WITH

    E-Print Network [OSTI]

    Texas at Austin, University of

    5-9035-01-P4 4-YEAR PAVEMENT MANAGEMENT PLAN (WITH PROPOSITION 12 PROJECTS): ANALYSIS REPORT Implementation of a Web-based GIS System to Provide Information for Pavement Maintenance Decision-Making DECEMBER Table of Contents Section 1. Pavement Management Plan Executive Summary

  1. 5-9035-01-P3 4-YEAR PAVEMENT MANAGEMENT PLAN

    E-Print Network [OSTI]

    Texas at Austin, University of

    5-9035-01-P3 4-YEAR PAVEMENT MANAGEMENT PLAN: ANALYSIS REPORT Authors: Zhanmin Zhang Michael R to Provide Information for Pavement Maintenance Decision-Making OCTOBER 2009 Performing Organization: Center and the Federal Highway Administration. #12;#12;iii Table of Contents Section 1. Pavement Management Plan

  2. FY 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA -MetricsBudget »2 LDRDFYFY-2013

  3. FY11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA -MetricsBudget of Energyf i c

  4. FY13

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA -MetricsBudget of Energyf i

  5. FY13

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA -MetricsBudget of Energyf i1739

  6. FY14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA -MetricsBudget of0006P Received:

  7. FY14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA -MetricsBudget of0006P

  8. FY15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA -MetricsBudget of0006P0030

  9. FY15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA -MetricsBudget of0006P00301592

  10. FY13

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) Environmental Assessments (EA)Budget » FY 2014 Budget Justification4 Reports456613

  11. FY14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) Environmental Assessments (EA)Budget » FY 2014 Budget Justification44 FOIA Requests

  12. FY15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) Environmental Assessments (EA)Budget » FY 2014 Budget Justification44 FOIA Requests5

  13. Solid-State Lighting R&D Multi-Year Program Plan | Department...

    Office of Environmental Management (EM)

    several years, and includes an overview of the status of SSL technology, the current DOE SSL portfolio, and the technology R&D plan. (104 pages, April 2014-Updated May 2014)...

  14. Annual Benefits Enrollment Form 2012 Plan Year Select Campus Location: Norman Oklahoma City Tulsa

    E-Print Network [OSTI]

    Oklahoma, University of

    Annual Benefits Enrollment Form 2012 Plan Year Select Campus Location: Norman Oklahoma City Tulsa BlueLincs HMO HMO Primary Care Physician #: Community Care HMO (Tulsa Area Only) HMO Primary Care

  15. BPM, 3/12-13/02 NSTX Research Plan Supported by

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    BPM, 3/12-13/02 NSTX Research Plan Supported by Martin Peng Oak Ridge National Laboratory, UT to accelerate research in FY03-04 to meet the FESAC 5-year Objective on ST #12;BPM, 3/12-13/02 NSTX Research programs #12;BPM, 3/12-13/02 NSTX Research Plan U.S. Collaborative Team members make crucial contributions

  16. FY 1997 cost savings report

    SciTech Connect (OSTI)

    Sellards, J.B.

    1998-06-01T23:59:59.000Z

    With the end of the cold war, funding for the Environmental Management program increased rapidly as nuclear weapons production facilities were shut down, cleanup responsibilities increased, and facilities were transferred to the cleanup program. As funding for the Environmental Management (EM) program began to level off in response to Administration and Congressional efforts to balance the Federal budget, the program redoubled its efforts to increase efficiency and get more productivity out of every dollar. Cost savings and enhanced performance are an integral pair of Hanford Site operations. FY1997 was the third year of a cost savings program that was initially defined in FY 1995. The definitions and process remained virtually the same as those used in FY 1996.

  17. SWEIS Annual Review - FY2001

    SciTech Connect (OSTI)

    GUERRERO, JOSEPH V.; MARTOSCH, JAMES P.; BAYLISS, LINDA S.; CATECHIS, CHRISTOPHER S.; MONAGHAN, TERI D.; BAILEY-WHITE, BRENDA E.

    2002-11-01T23:59:59.000Z

    The SNL/NM FY2001 SWEIS Annual Review discusses changes in facilities and facility operations that have occurred in selected and notable facilities since source data were collected for the SNL/NM SWEIS (DOE/EIS-0281). The following information is presented: (1) An updated overview of SNL/NM selected and notable facilities and infrastructure capabilities. (2) An overview of SNL/NM environment, safety, and health programs, including summaries of the purpose, operations, activities, hazards, and hazard controls at relevant facilities and risk management methods for SNL/NM. (3) Updated base year activities data, projections of FY2003 and FY2008 activities, together with related inventories, material consumption, emissions, waste, and resource consumption. (4) Appendices summarizing activities and related hazards at SNL/NM individual special, general, and highbay laboratories, and chemical purchases.

  18. Komsomol participation in the Soviet First Five-Year Plan 

    E-Print Network [OSTI]

    Todd, Ann

    1985-01-01T23:59:59.000Z

    will similarly expose processes unique to that system at that time. The most important youth group in Soviet Russia during the years 1928-1933 wa. s the Komsomol, an acronym for Communist Youth League (Kommunisticheskii Soiuz Molodezhi). Before examining... Russia. It featured seemingly endless columns on the goals of the Party and the opportunities for youth to participate. Entries on Marxism-Leninism were given new meaning in the context of sacrifice and struggle. Especially emphasized were...

  19. FTCP Annual Plan - Fiscal Year 2002 | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAM FLASH2011-17-OPAM DOEFindingsNewsFROM:Issue2

  20. FTCP Annual Plan - Fiscal Year 2003 | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAM FLASH2011-17-OPAM DOEFindingsNewsFROM:Issue23

  1. FTCP Annual Plan - Fiscal Year 2004 | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAM FLASH2011-17-OPAM

  2. FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 | Department

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAM FLASH2011-17-OPAMFTCPFace to Face

  3. FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 | Department

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAM FLASH2011-17-OPAMFTCPFace to FaceOPERATIONALof

  4. FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 | Department

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAM FLASH2011-17-OPAMFTCPFace to

  5. Ten-Year Site Plans (TYSP) | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City,EnrichedSupplemental Directives | National NuclearTen-Year Site

  6. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect (OSTI)

    Not Available

    1992-12-01T23:59:59.000Z

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  7. YEAR

    National Nuclear Security Administration (NNSA)

    8 Females 25 PAY PLAN YEAR 2014 SES 1 EJEK 3 EN 05 1 EN 04 25 EN 03 1 NN (Engineering) 25 NQ (ProfTechAdmin) 25 NU (TechAdmin Support) 2 YEAR 2014 American Indian Alaska Native...

  8. FY 2008 Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA - Request1Fiscal Year 2008

  9. FY 2010 Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA -Metrics andFiscal Year 2010

  10. Public affairs plan

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies.

  11. Isotope production and distribution Programs Fiscal Year (FY) 1995 Financial Statement Audit (ER-FC-96-01)

    SciTech Connect (OSTI)

    NONE

    1996-02-12T23:59:59.000Z

    The charter of the Department of Energy (DOE) Isotope Production and Distribution Program (Isotope Program) covers the production and sale of radioactive and stable isotopes, associated byproducts, surplus materials such as lithium and deuterium, and related isotope services. Services provided include, but are not limited to, irradiation services, target preparation and processing, source encapsulation and other special preparations, analyses, chemical separations, and leasing of stable isotopes for research purposes. Isotope Program products and services are sold worldwide for use in a wide variety of research, development, biomedical, and industrial applications. The Isotope Program reports to the Director of the Office of Nuclear Energy, Science and Technology. The Isotope Program operates under a revolving fund, as established by the Fiscal Year 1990 Energy and Water Appropriations Act (Public Law 101-101). The Fiscal Year 1995 Appropriations Act (Public Law 103-316) modified predecessor acts to allow prices charged for Isotope Program products and services to be based on production costs, market value, the needs of the research community, and other factors. Prices set for small-volume, high-cost isotopes that are needed for research may not achieve full-cost recovery. Isotope Program costs are financed by revenues from the sale of isotopes and associated services and through payments from the isotope support decision unit, which was established in the DOE fiscal year 1995 Energy, Supply, Research, and Development appropriation. The isotope decision unit finances the production and processing of unprofitable isotopes that are vital to the national interest.

  12. Solid waste program fiscal year 1997 multi-year work plan WBS 1.2.1

    SciTech Connect (OSTI)

    Riddelle, J.G.

    1996-09-30T23:59:59.000Z

    This document provides the technical baseline, work breakdown structure, schedule baseline, cost baseline, and execution year for the solid waste program.

  13. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Departmentof OhioFirst Annual PostSmart Grid Progress |

  14. Waste Generation Forecast for DOE-ORO`s Environmental Restoration OR-1 Project: FY 1994--FY 2001. Environmental Restoration Program, September 1993 Revision

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    This Waste Generation Forecast for DOE-ORO`s Environmental Restoration OR-1 Project. FY 1994--FY 2001 is the third in a series of documents that report current estimates of the waste volumes expected to be generated as a result of Environmental Restoration activities at Department of Energy, Oak Ridge Operations Office (DOE-ORO), sites. Considered in the scope of this document are volumes of waste expected to be generated as a result of remedial action and decontamination and decommissioning activities taking place at these sites. Sites contributing to the total estimates make up the DOE-ORO Environmental Restoration OR-1 Project: the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Y-12 Plant, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and the off-site contaminated areas adjacent to the Oak Ridge facilities (collectively referred to as the Oak Ridge Reservation Off-Site area). Estimates are available for the entire fife of all waste generating activities. This document summarizes waste estimates forecasted for the 8-year period of FY 1994-FY 2001. Updates with varying degrees of change are expected throughout the refinement of restoration strategies currently in progress at each of the sites. Waste forecast data are relatively fluid, and this document represents remediation plans only as reported through September 1993.

  15. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Technical Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(Fact Sheet), Geothermal Technologies ProgramDemonstration Plan: Program1-088

  16. Los Alamos National Laboratory capability reviews - FY 2011 status

    SciTech Connect (OSTI)

    Springer, Everett P [Los Alamos National Laboratory

    2011-01-12T23:59:59.000Z

    Capability reviews are the Los Alamos National Laboratory approach to assess the quality of its science, technology, and engineering (STE), and its integration across the Laboratory. There are seven capability reviews in FY 2011 reviews. The Weapons Science and Engineering review will be replaced by the National Nuclear Security Administration's Predictive Science Panel for 2011 . Beginning in 2011, third-year LORD projects will be reviewed by capability review committees rather than the first-year LORD projects that have been performed for the last three years. This change addresses concerns from committees about reviewing a project before it had made any substantive progress. The current schedule, and chairs for the 2011 capability reviews is presented. The three-year cycle (2011-2013) for capability reviews are presented for planning purposes.

  17. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    SciTech Connect (OSTI)

    GRYGIEL, M.L.

    1998-10-08T23:59:59.000Z

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baseline and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.

  18. Landlord Program multi-year program plan fiscal year 1995 WBS 7.5

    SciTech Connect (OSTI)

    Young, C.L.

    1994-09-26T23:59:59.000Z

    The Landlord Program mission is to maintain, preserve, or upgrade the strategic assets of the Hanford Site to meet the overall cleanup mission. This encompasses innovative, appropriate, and cost effective general purpose infrastructure support, services, and long range strategic site planning that is the foundation for seven major Hanford programs. These programs are (1) Environmental Restoration, (2) Tank Waste Remediation System, (3) Solid/Liquid Waste Decontamination, (4) Facility Transition, (5) Spent Fuel, (6) Technology Development, and (7) the Multi-Program Laboratory. General infrastructure support consists of facilities, systems, and equipment that by design or use are not essentially dedicated to a single program mission. Facilities include laboratories, shops, warehouses, and general work space. Systems include electrical, process sewers, rail, roads, telecommunications, water, fire and emergency response, and steam supply and distribution. Funding also supports capital equipment critical to maintaining, upgrading, or operating the general infrastructure. Paramount to these objectives is compliance with all applicable laws, orders, agreements, codes, standards, best management and safety practices. The objectives for general infrastructure support are reflected in five programmatic functions, (1) Program Integration, (2) Capital Equipment, (3) Expense Funded Projects, (4) General Plant Projects, and (5) Line Items.

  19. 2006NIH Extramural Loan Repayment Programs FY 2006 U.S. Department of Health and Human Services National Institutes of Health www.lrp.nih.gov

    E-Print Network [OSTI]

    Bandettini, Peter A.

    Extramural Loan Repayment Programs FY 2006 Table of Contents The Year in Review 3 The Five Extramural Loan The Year in Review In Fiscal Year (FY) 2006, 3,200 individuals applied to the five Extramural Loan

  20. FY 1996 solid waste integrated life-cycle forecast characteristics summary. Volumes 1 and 2

    SciTech Connect (OSTI)

    Templeton, K.J.

    1996-05-23T23:59:59.000Z

    For the past six years, a waste volume forecast has been collected annually from onsite and offsite generators that currently ship or are planning to ship solid waste to the Westinghouse Hanford Company`s Central Waste Complex (CWC). This document provides a description of the physical waste forms, hazardous waste constituents, and radionuclides of the waste expected to be shipped to the CWC from 1996 through the remaining life cycle of the Hanford Site (assumed to extend to 2070). In previous years, forecast data has been reported for a 30-year time period; however, the life-cycle approach was adopted this year to maintain consistency with FY 1996 Multi-Year Program Plans. This document is a companion report to two previous reports: the more detailed report on waste volumes, WHC-EP-0900, FY1996 Solid Waste Integrated Life-Cycle Forecast Volume Summary and the report on expected containers, WHC-EP-0903, FY1996 Solid Waste Integrated Life-Cycle Forecast Container Summary. All three documents are based on data gathered during the FY 1995 data call and verified as of January, 1996. These documents are intended to be used in conjunction with other solid waste planning documents as references for short and long-term planning of the WHC Solid Waste Disposal Division`s treatment, storage, and disposal activities over the next several decades. This document focuses on two main characteristics: the physical waste forms and hazardous waste constituents of low-level mixed waste (LLMW) and transuranic waste (both non-mixed and mixed) (TRU(M)). The major generators for each waste category and waste characteristic are also discussed. The characteristics of low-level waste (LLW) are described in Appendix A. In addition, information on radionuclides present in the waste is provided in Appendix B. The FY 1996 forecast data indicate that about 100,900 cubic meters of LLMW and TRU(M) waste is expected to be received at the CWC over the remaining life cycle of the site. Based on ranges provided by the waste generators, this baseline volume could fluctuate between a minimum of about 59,720 cubic meters and a maximum of about 152,170 cubic meters. The range is primarily due to uncertainties associated with the Tank Waste Remediation System (TWRS) program, including uncertainties regarding retrieval of long-length equipment, scheduling, and tank retrieval technologies.

  1. U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20032008

    E-Print Network [OSTI]

    Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2003­2008 Statement of the Chairman The Nuclear Waste Policy Amendments Act of 1987 directed the U.S. Department as the location of a permanent repository for dis posing of spent nuclear fuel and high-level radioactive waste

  2. U.S. Nuclear Waste Technical Review Board Fiscal Year 2002-2007 Strategic Plan

    E-Print Network [OSTI]

    Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Fiscal Year 2002-2007 Strategic Plan Statement of the Chairman The U.S. Nuclear Waste Technical Review Board was established of Energy Mission The Board's mission, established in the Nuclear Waste Policy Amendments Act (NWPAA

  3. U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20042009

    E-Print Network [OSTI]

    Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2004­2009 (Revised March 2004) Statement of the Board The Nuclear Waste Policy Amendments Act of 1987 directed the U-level radioactive waste. The Act also established the U.S. Nuclear Waste Technical Review Board as an independent

  4. U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20042009

    E-Print Network [OSTI]

    Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2004­2009 (Revised March 2004) Statement of the Board The Nuclear Waste Policy Amendments Act of 1987 directed the U-level radioactive waste. The Act also established the U.S. Nuclear Waste Technical Review Board as an indepen dent

  5. Bachelor's of Science in Computer Science Four Year Plan of Study (2012 2013)

    E-Print Network [OSTI]

    Barrash, Warren

    360: ENGINEERING STATISTICS OR MATH 361: PROBABILITY AND STATISTICS I 3 MATH ELECTIVE* 3-4 SOCIALBachelor's of Science in Computer Science Four Year Plan of Study (2012 2013) W SPRING COMM 101: FUNDS. OF SPEECH COMMUNICATION* DLS 3 COMPSCI 125: INTRODUCTION TO COMPUTER SCIENCE I 4

  6. Department of Materials Science and Engineering Four Year Plan (201314 Catalog, ready for calculus)

    E-Print Network [OSTI]

    Barrash, Warren

    Department of Materials Science and Engineering Four Year Plan (201314 Catalog, ready 360 Engineering Statistics 3 MSE 380 Materials Science and Engineering Lab 2 Technical or engineering) MSE 482 Senior Project II 3 MSE 404L Materials Analysis Lab 1 Technical or engineering elective 3

  7. Department of Materials Science and Engineering Four Year Plan (2011-12 Catalog)

    E-Print Network [OSTI]

    Barrash, Warren

    Department of Materials Science and Engineering Four Year Plan (2011-12 Catalog) FALL SEMESTER Dimensions of Technology 3 MSE 380 Materials Science and Engineering Lab 2 MATH 360 or 361 Statistics 3's advisor. #12;Materials Science and Engineering Curriculum MATH 175 Calculus II MATH 275 Multivariable

  8. engineering101 2013-2014 program planning guide for first-year engineering students

    E-Print Network [OSTI]

    Ghosh, Somnath

    engineering101 2013-2014 program planning guide for first-year engineering students in the Whiting School of Engineering at Johns Hopkins University environmental electrical and computer applied math and statistics biomedical computer science mechanical civil chemical and biomolecular engineering mechanics

  9. Information Systems and Decision Sciences Five-Year Strategic Plan for National Prominence

    E-Print Network [OSTI]

    1 Information Systems and Decision Sciences Five-Year Strategic Plan for National Prominence 2010 to the advancement of knowledge in information systems and decision sciences; Delivering high quality degree programs that produce graduates who will excel in in information systems and decision sciences; Providing

  10. Bachelor's of Science in Computer Science Four-Year Plan of Study (2013-2014)

    E-Print Network [OSTI]

    Barrash, Warren

    Bachelor's of Science in Computer Science Four-Year Plan of Study (2013-2014) Z* DLS 3 COMPSCI 121: COMPUTER SCIENCE I 4 ENGL 101: INTRODUCTION TO COLLEGE WRITING 3 ENGL 102 TOTAL 13 SEMESTER TOTAL 15 SOPHOMORE FALL SPRING COMPSCI 221: COMPUTER SCIENCE II 3 COMPSCI 230: ETHICAL

  11. Bachelor's of Science in Computer Science Four-Year Plan of Study (2014-2015)

    E-Print Network [OSTI]

    Barrash, Warren

    #12;Bachelor's of Science in Computer Science Four-Year Plan of Study (2014-2015) W OF COMMUNICATION DLS 3 CS 121: COMPUTER SCIENCE I 3 ENGL 101: INTRODUCTION TO COLLEGE WRITING 3 CS 121L: COMPUTER AND RESEARCH 3 SEMESTER TOTAL 14 SEMESTER TOTAL 14 SOPHOMORE FALL SPRING CS 221: COMPUTER SCIENCE II 3 CS 230

  12. Bachelor's of Science in Computer Science Four-Year Plan of Study (2011-2012)

    E-Print Network [OSTI]

    Barrash, Warren

    #12;Bachelor's of Science in Computer Science Four-Year Plan of Study (2011-2012) J 101: Fundamentals of Speech Communication 3 COMPSCI 125: Introduction to Computer Science I 4 ENGL 101 COMPSCI 225: Introduction to Computer Science II 4 COMPSCI 230: Ethical Issues in Computing 2 ENGL 202

  13. Five-Year Master Plan University of Michigan-Ann Arbor

    E-Print Network [OSTI]

    Kamat, Vineet R.

    Five-Year Master Plan University of Michigan-Ann Arbor Prepared by: University of Michigan UNIVERSITY OF MICHIGAN-ANN ARBOR TABLE OF CONTENTS I. Mission Statement II. Instructional Programming III The mission of the University of Michigan is to serve the people of Michigan and the world through preeminence

  14. LANL FY11 activities(u)

    SciTech Connect (OSTI)

    Aragon, Ezekiel D [Los Alamos National Laboratory

    2011-01-06T23:59:59.000Z

    Briefings presenting W78 programmatic activities for FY11 and the status and plan for associated Hydro 3617, is included wherewith in support of the NNSA W78 Program Review Meetings scheduled for January 11 thru 13, 2011, at the Savannah River Plant, SC.

  15. ACTION 2015: Education First Reallocation ($21M) and AMP (non-Research Roadmap) for FY 2012

    E-Print Network [OSTI]

    pg. 1 ACTION 2015: Education First Reallocation ($21M) and AMP (non-Research Roadmap) for FY 2012 at http://provost.tamu.edu/initiatives/strategic-planning-2010/strategic-planning-documents/strategic-budget multiple sources with varying restrictions on their use. We will be working during FY12 to get as much

  16. FY 2007 Summary Table by Appropriation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment ofAppropriationBudget DOE:5 FY 2006 FY

  17. FY 2007 Summary Table by Organization

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment ofAppropriationBudget DOE:5 FY 2006 FY5

  18. FY 2008 Summary Table by Appropriation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current Congressional

  19. FY 2008 Summary Table by Organization

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current Congressional6

  20. FY 2009 Control Table by Appropriation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current27Control Table

  1. FY 2009 Control Table by Organization

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008 Current27Control

  2. FY 2009 LDRD Report | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008

  3. FY 2009 Summary Table by Appropriation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State

  4. FY 2011 Control Table by Appropriation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7

  5. FY 2011 Control Table by Organization

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State71 Summary Control

  6. FY 2011 LDRD Report | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State71

  7. FY 2011 Report on Unobligated Balances

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State71Laboratory

  8. FY 2011 Statistical Table by Appropriation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY

  9. FY 2013 Budget Hearing | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FYEnergy And26 Department023FY

  10. Energy-water analysis of the 10-year WECC transmission planning study cases.

    SciTech Connect (OSTI)

    Tidwell, Vincent Carroll; Passell, Howard David; Castillo, Cesar; Moreland, Barbara

    2011-11-01T23:59:59.000Z

    In 2011 the Department of Energy's Office of Electricity embarked on a comprehensive program to assist our Nation's three primary electric interconnections with long term transmission planning. Given the growing concern over water resources in the western U.S. the Western Electricity Coordinating Council (WECC) requested assistance with integrating water resource considerations into their broader electric transmission planning. The result is a project with three overarching objectives: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western Interconnection to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Western States Water Council (WSWC) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and WSWC. The foundation for the Energy-Water DSS is Sandia National Laboratories Energy-Power-Water Simulation (EPWSim) model (Tidwell et al. 2009). The modeling framework targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. This framework provides an interactive environment to explore trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., state, county, watershed, interconnection). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. The framework currently supports modules for calculating water withdrawal and consumption for current and planned electric power generation; projected water demand from competing use sectors; and, surface and groundwater availability. WECC's long range planning is organized according to two target planning horizons, a 10-year and a 20-year. This study supports WECC in the 10-year planning endeavor. In this case the water implications associated with four of WECC's alternative future study cases (described below) are calculated and reported. In future phases of planning we will work with WECC to craft study cases that aim to reduce the thermoelectric footprint of the interconnection and/or limit production in the most water stressed regions of the West.

  11. Idaho National Laboratory Integrated Safety Management System FY 2013 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Farren Hunt

    2013-12-01T23:59:59.000Z

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for Fiscal Year (FY) 2014. Results of the FY 2013 annual effectiveness review demonstrate that the INL’s ISMS program is “Effective” and continually improving and shows signs of being significantly strengthened. Although there have been unacceptable serious events in the past, there has also been significant attention, dedication, and resources focused on improvement, lessons learned and future prevention. BEA’s strategy of focusing on these improvements includes extensive action and improvement plans that include PLN 4030, “INL Sustained Operational Improvement Plan, PLN 4058, “MFC Strategic Excellence Plan,” PLN 4141, “ATR Sustained Excellence Plan,” and PLN 4145, “Radiological Control Road to Excellence,” and the development of LWP 20000, “Conduct of Research.” As a result of these action plans, coupled with other assurance activities and metrics, significant improvement in operational performance, organizational competence, management oversight and a reduction in the number of operational events is being realized. In short, the realization of the fifth core function of ISMS (feedback and continuous improvement) and the associated benefits are apparent.

  12. Photovoltaic Subcontract Program, FY 1991

    SciTech Connect (OSTI)

    Not Available

    1992-03-01T23:59:59.000Z

    This report summarizes the fiscal year (FY) 1991 (October 1, 1990, through September 30, 1991) progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL) -- formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, the University Participation Program, and the Photovoltaic Manufacturing Technology (PVMaT) project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1991, and future research directions.

  13. Implementation plan for liquid low-level radioactive waste systems under the FFA for fiscal years 1996 and 1997 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1996-06-01T23:59:59.000Z

    This document is the fourth annual revision of the plans and schedules for implementing the Federal Facility Agreement (FFA) compliance program, originally submitted in 1992 as ES/ER-17&D1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. This document summarizes the progress that has been made to date implementing the plans and schedules for meeting the FFA commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL). In addition, this document lists FFA activities planned for FY 1997. Information presented in this document provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present plans and schedules associated with remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, of LLLW tank systems that have been removed from service.

  14. FY 2010 Annual Uncosted Balances Report | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 20082 C C O

  15. FY 2010 DOE Agency Financial Report | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 20082

  16. FY 2010 E-Government Act Report | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY 2008210

  17. FY 2011 Budget Roll-Out Presentation | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6 FY 2007 FY 2008State7 FY0Agency8467A

  18. FY 1995 cost savings report

    SciTech Connect (OSTI)

    Andrews-Smith, K.L., Westinghouse Hanford

    1996-06-21T23:59:59.000Z

    Fiscal Year (FY) 1995 challenged us to dramatically reduce costs at Hanford. We began the year with an 8 percent reduction in our Environmental Management budget but at the same time were tasked with accomplishing additional workscope. This resulted in a Productivity Challenge whereby we took on more work at the beginning of the year than we had funding to complete. During the year, the Productivity Challenge actually grew to 23 percent because of recissions, Congressional budget reductions, and DOE Headquarters actions. We successfully met our FY 1995 Productivity Challenge through an aggressive cost reduction program that identified and eliminated unnecessary workscope and found ways to be more efficient. We reduced the size of the workforce, cut overhead expenses, eliminated paperwork, cancelled construction of new facilities, and reengineered our processes. We are proving we can get the job done better and for less money at Hanford. DOE`s drive to do it ``better, faster, cheaper`` has led us to look for more and larger partnerships with the private sector. The biggest will be privatization of Hanford`s Tank Waste Remediation System, which will turn liquid tank waste into glass logs for eventual disposal. We will also save millions of dollars and avoid the cost of replacing aging steam plants by contracting Hanford`s energy needs to a private company. Other privatization successes include the Hanford Mail Service, a spinoff of advanced technical training, low level mixed waste thermal treatment, and transfer of the Hanford Museums of Science and history to a private non-profit organization. Despite the rough roads and uncertainty we faced in FY 1995, less than 3 percent of our work fell behind schedule, while the work that was performed was completed with an 8.6 percent cost under-run. We not only met the FY 1995 productivity challenge, we also met our FY 1995-1998 savings commitments and accelerated some critical cleanup milestones. The challenges continue. Budgets remain on the decline, even while the expectations increase. Yet we are confident in our ability to keep our commitments and goals by identifying new efficiencies in the Hanford cleanup program. We will also pursue new contracting arrangements that will allow us to foster greater competition and use more commercial practices while maintaining our commitment to the safety and health of the public, our workers, and the environment.

  19. UNH Office of Environmental Health & Safety Strategic Plan

    E-Print Network [OSTI]

    New Hampshire, University of

    FY2015-2019 The Office of Environmental Health and Safety strategic plan for FY 2015-2019 contains two parts: Part 1 consists of goals. § Ascertain if the Hazardous Waste Management budget is sufficient

  20. Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included.

  1. NOAA Office of Program Planning and Integration

    E-Print Network [OSTI]

    NOAA Office of Program Planning and Integration STRATEGIC PLAN FY 2005 ­ FY 2010 U.S. Department information for decision making. Mary M. Glackin Assistant Administrator for Program Planning and Integration and Integration II. PPI Outcomes and Strategies III. PPI's Role in Executing Programs Appendices 1. Program

  2. High-Level Waste Systems Plan. Revision 7

    SciTech Connect (OSTI)

    Brooke, J.N.; Gregory, M.V.; Paul, P.; Taylor, G.; Wise, F.E.; Davis, N.R.; Wells, M.N.

    1996-10-01T23:59:59.000Z

    This revision of the High-Level Waste (HLW) System Plan aligns SRS HLW program planning with the DOE Savannah River (DOE-SR) Ten Year Plan (QC-96-0005, Draft 8/6), which was issued in July 1996. The objective of the Ten Year Plan is to complete cleanup at most nuclear sites within the next ten years. The two key principles of the Ten Year Plan are to accelerate the reduction of the most urgent risks to human health and the environment and to reduce mortgage costs. Accordingly, this System Plan describes the HLW program that will remove HLW from all 24 old-style tanks, and close 20 of those tanks, by 2006 with vitrification of all HLW by 2018. To achieve these goals, the DWPF canister production rate is projected to climb to 300 canisters per year starting in FY06, and remain at that rate through the end of the program in FY18, (Compare that to past System Plans, in which DWPF production peaked at 200 canisters per year, and the program did not complete until 2026.) An additional $247M (FY98 dollars) must be made available as requested over the ten year planning period, including a one-time $10M to enhance Late Wash attainment. If appropriate resources are made available, facility attainment issues are resolved and regulatory support is sufficient, then completion of the HLW program in 2018 would achieve a $3.3 billion cost savings to DOE, versus the cost of completing the program in 2026. Facility status information is current as of October 31, 1996.

  3. FY08 Annual Report for Nuclear Resonance Fluorescence Imaging

    SciTech Connect (OSTI)

    Warren, Glen A.; Caggiano, Joseph A.

    2009-01-06T23:59:59.000Z

    FY08 annual report for project the "Nuclear Resonance Fluorescence Imaging" project. Reviews accomplishments of last 3 years, including U-235 signature search, comparison of different photon sources, and examination of NRF measurements using monochromatic photon source.

  4. FY 1996 solid waste integrated life-cycle forecast container summary volume 1 and 2

    SciTech Connect (OSTI)

    Valero, O.J.

    1996-04-23T23:59:59.000Z

    For the past six years, a waste volume forecast has been collected annually from onsite and offsite generators that currently ship or are planning to ship solid waste to the Westinghouse Hanford Company`s Central Waste Complex (CWC). This document provides a description of the containers expected to be used for these waste shipments from 1996 through the remaining life cycle of the Hanford Site. In previous years, forecast data have been reported for a 30-year time period; however, the life-cycle approach was adopted this year to maintain consistency with FY 1996 Multi-Year Program Plans. This document is a companion report to the more detailed report on waste volumes: WHC-EP0900, FY 1996 Solid Waste Integrated Life-Cycle Forecast Volume Summary. Both of these documents are based on data gathered during the FY 1995 data call and verified as of January, 1996. These documents are intended to be used in conjunction with other solid waste planning documents as references for short and long-term planning of the WHC Solid Waste Disposal Division`s treatment, storage, and disposal activities over the next several decades. This document focuses on the types of containers that will be used for packaging low-level mixed waste (LLMW) and transuranic waste (both non-mixed and mixed) (TRU(M)). The major waste generators for each waste category and container type are also discussed. Containers used for low-level waste (LLW) are described in Appendix A, since LLW requires minimal treatment and storage prior to onsite disposal in the LLW burial grounds. The FY 1996 forecast data indicate that about 100,900 cubic meters of LLMW and TRU(M) waste are expected to be received at the CWC over the remaining life cycle of the site. Based on ranges provided by the waste generators, this baseline volume could fluctuate between a minimum of about 59,720 cubic meters and a maximum of about 152,170 cubic meters.

  5. Alternative Electrochemical Salt Waste Forms, Summary of FY11-FY12 Results

    SciTech Connect (OSTI)

    Riley, Brian J.; Mccloy, John S.; Crum, Jarrod V.; Lepry, William C.; Rodriguez, Carmen P.; Windisch, Charles F.; Matyas, Josef; Westman, Matthew P.; Rieck, Bennett T.; Lang, Jesse B.; Olszta, Matthew J.; Pierce, David A.

    2014-03-26T23:59:59.000Z

    The Fuel Cycle Research and Development Program, sponsored by the U.S. Department of Energy Office of Nuclear Energy, is currently investigating alternative waste forms for wastes generated from nuclear fuel processing. One such waste results from an electrochemical separations process, called the “Echem” process. The Echem process utilizes a molten KCl-LiCl salt to dissolve the fuel. This process results in a spent salt containing alkali, alkaline earth, lanthanide halides and small quantities of actinide halides, where the primary halide is chloride with a minor iodide fraction. Pacific Northwest National Laboratory (PNNL) is concurrently investigating two candidate waste forms for the Echem spent-salt: high-halide minerals (i.e., sodalite and cancrinite) and tellurite (TeO2)-based glasses. Both of these candidates showed promise in fiscal year (FY) 2009 and FY2010 with a simplified nonradioactive simulant of the Echem waste. Further testing was performed on these waste forms in FY2011 and FY2012 to assess the possibility of their use in a sustainable fuel cycle. This report summarizes the combined results from FY2011 and FY2012 efforts.

  6. Hanford Site Environmental Safety and Health Fiscal Year 2001 Budget-Risk management summary

    SciTech Connect (OSTI)

    REEP, I.E.

    1999-05-12T23:59:59.000Z

    The Hanford Site Environment, Safety and Health (ES&H) Budget-Risk Management Summary report is prepared to support the annual request to sites in the U.S. Department of Energy (DOE) Complex by DOE, Headquarters. The request requires sites to provide supplementary crosscutting information related to ES&H activities and the ES&H resources that support these activities. The report includes the following: (1) A summary status of fiscal year (FY) 1999 ES&H performance and ES&H execution commitments; (2)Status and plans of Hanford Site Office of Environmental Management (EM) cleanup activities; (3) Safety and health (S&H) risk management issues and compliance vulnerabilities of FY 2001 Target Case and Below Target Case funding of EM cleanup activities; (4) S&H resource planning and crosscutting information for FY 1999 to 2001; and (5) Description of indirect-funded S&H activities.

  7. USWRP funded the enabling infrastructure of HWT during FY13-14 as well as contributed to the development of a new decision support tool for severe weather warnings. HWT tests and evaluates new experimental products in

    E-Print Network [OSTI]

    on human, surface transportation and aviation. The Fiscal Year (FY) 2015 President's Budget Request budget is $4.1M, the FY 2013 actual budget was $3.9M and the FY 2012 actual budget was $4.2M. USWUSWRP funded the enabling infrastructure of HWT during FY13-14 as well as contributed

  8. Nuclear Fuel Cycle Reasoner: PNNL FY13 Report

    SciTech Connect (OSTI)

    Hohimer, Ryan E.; Strasburg, Jana D.

    2013-09-30T23:59:59.000Z

    In Fiscal Year 2012 (FY12) PNNL implemented a formal reasoning framework and applied it to a specific challenge in nuclear nonproliferation. The Semantic Nonproliferation Analysis Platform (SNAP) was developed as a preliminary graphical user interface to demonstrate the potential power of the underlying semantic technologies to analyze and explore facts and relationships relating to the nuclear fuel cycle (NFC). In Fiscal Year 2013 (FY13) the SNAP demonstration was enhanced with respect to query and navigation usability issues.

  9. Transmutation Fuels Campaign FY-09 Accomplishments Report

    SciTech Connect (OSTI)

    Lori Braase

    2009-09-01T23:59:59.000Z

    This report summarizes the fiscal year 2009 (FY-08) accomplishments for the Transmutation Fuels Campaign (TFC). The emphasis is on the accomplishments and relevance of the work. Detailed description of the methods used to achieve the highlighted results and the associated support tasks are not included in this report.

  10. NANOTECHNOLOGY INITIATIVE Annual Report FY 20092010

    E-Print Network [OSTI]

    NC STATE NANOTECHNOLOGY INITIATIVE Annual Report FY 20092010 In This Report: · Raleigh named top AS AN EMERGING LEADER IN THE FIELD OF NANOTECHNOLOGY." Dr. Gregory Parsons, NC State Nanotechnology Initiative was a period of tremendous growth for nanotechnology activitiesThis past year was a period of tremendous growth

  11. Transmission and distribution technologies: Program overview, FY 1993--FY 1994

    SciTech Connect (OSTI)

    NONE

    1995-06-01T23:59:59.000Z

    Electricity is the lifeblood of our Nation`s economy and a critical contributor to our standard of living. For decades, increases in the gross domestic product (GDP) have been accompanied by increases in electricity use. This overview provides the reader with an introduction to the US Department of Energy`s (DOE`s) T&D Technologies Program. It shows how the program is meeting the challenges being imposed on the T&D infrastructure by the changing electric power industry and how the Nation will benefit from its efforts. The overview describes the program`s ongoing projects and discusses the new projects being initiated in fiscal year (FY) 1995.

  12. FISCAL YEAR 2015 B U D G E T E S T I M A T E S

    E-Print Network [OSTI]

    Waliser, Duane E.

    to improve the quality of life on our home planet 2 #12;2015 Budget Highlights Provides the necessary planet and the Sun. By the end of FY 2015, NASA will have launched an unprecedented five Earth scienceFISCAL YEAR 2015 B U D G E T E S T I M A T E S 1 #12;Strategic Plan Expand the frontiers

  13. Test Plan for the Demonstration of Geophysical Techniques for Single-Shell Tank Leak Detection at the Hanford Mock Tank Site: Fiscal Year 2001

    SciTech Connect (OSTI)

    Barnett, D. Brent; Gee, Glendon W.; Sweeney, Mark D.

    2001-07-31T23:59:59.000Z

    As part of the Leak Detection, Monitoring and Mitigation (LDMM) program conducted by CH2M HILL 105-A during FY 2001. These tests are being conducted to assess the applicability of these methods (Electrical Resistance Tomography [ERT], High Resolution Resistivity [HRR], Cross-Borehole Seismography [XBS], Cross-Borehole Radar [XBR], and Cross-Borehole Electromagnetic Induction [CEMI]) to the detection and measurement of Single Shell Tank (SST) leaks into the vadose zone during planned sluicing operations. The testing in FY 2001 will result in the selection of up to two methods for further testing in FY 2002. In parallel with the geophysical tests, a Partitioning Interwell Tracer Test (PITT) study will be conducted simultaneously at the Mock Tank to assess the effectiveness of this technology in detecting and quantifying tank leaks in the vadose zone. Preparatory and background work using Cone Penetrometer methods (CPT) will be conducted at the Mock Tank site and an adjacent test area to derive soil properties for groundtruthing purposes for all methods.

  14. FY 2014 Budget Rollout Presentation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAMDepartmentofofForewordin Target CapsulesFY 2016

  15. FY11 OE public summary

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAMDepartmentofofForewordinFY 2016 Budget6and

  16. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01T23:59:59.000Z

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  17. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01T23:59:59.000Z

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA`s Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  18. Idaho National Laboratory 2015-2023 Ten-Year Site Plan

    SciTech Connect (OSTI)

    Sheryl Morton; Elizabeth Connell; Bill Buyers; John Reisenauer; Rob Logan; Chris Ischay; Ernest Fossum; Paul Contreras; Joel Zarret; Steve Hill; Jon Tillo

    2013-09-01T23:59:59.000Z

    This Idaho National Laboratory (INL) Ten-Year Site Plan (TYSP) describes the strategy for accomplishing the long-term objective of sustaining the INL infrastructure to meet the Department of Energy Office of Nuclear Energy (DOE-NE) mission: to promote nuclear power as a resource capable of making major contributions in meeting the nation’s energy supply, environmental and energy security needs. This TYSP provides the strategy for INL to accomplish its mission by: (1) linking R&D mission goals to core capabilities and infrastructure requirements; (2) establishing a ten-year end-state vision for INL facility complexes; (3) identifying and prioritizing infrastructure needs and capability gaps; (4) establishing maintenance and repair strategies that allow for sustainment of mission-critical (MC) facilities; and (5) applying sustainability principles to each decision and action. The TYSP serves as the infrastructure-planning baseline for INL; and, though budget formulation documents are informed by the TYSP, it is not itself a budget document.

  19. Advanced Fuels Campaign FY 2010 Accomplishments Report

    SciTech Connect (OSTI)

    Lori Braase

    2010-12-01T23:59:59.000Z

    The Fuel Cycle Research and Development (FCRD) Advanced Fuels Campaign (AFC) Accomplishment Report documents the high-level research and development results achieved in fiscal year 2010. The AFC program has been given responsibility to develop advanced fuel technologies for the Department of Energy (DOE) using a science-based approach focusing on developing a microstructural understanding of nuclear fuels and materials. The science-based approach combines theory, experiments, and multi-scale modeling and simulation aimed at a fundamental understanding of the fuel fabrication processes and fuel and clad performance under irradiation. The scope of the AFC includes evaluation and development of multiple fuel forms to support the three fuel cycle options described in the Sustainable Fuel Cycle Implementation Plan4: Once-Through Cycle, Modified-Open Cycle, and Continuous Recycle. The word “fuel” is used generically to include fuels, targets, and their associated cladding materials. This document includes a brief overview of the management and integration activities; but is primarily focused on the technical accomplishments for FY-10. Each technical section provides a high level overview of the activity, results, technical points of contact, and applicable references.

  20. Planning for the 400,000 tons/year AISI ironmaking demonstration plant

    SciTech Connect (OSTI)

    Aukrust, E. (LTV Steel Corp., Cleveland, OH (United States). AISI Direct Steelmaking Program)

    1993-01-01T23:59:59.000Z

    The American Iron and Steel Institute (AISI) has formulated a four-year program to design, construct, and operate a 400,000 net ton per year ironmaking demonstration plant. The plant will employ the coal-based ironmaking process developed under a 1989 cooperative agreement with DOE. AISI will manage the design and construction to be completed in the first two years and operate the plant for the second two years with a variety or ores, coals, and fluxes. Campaigns of increasing length are planned to optimize operations. After successful operation, the plant will be taken over by the host company. Results of studies to date indicate that, on a commercial scale, the AISI process will use 27% less energy and have variable operating costs $10 per ton lower and capital costs of $160 per annual ton, compared to the $250 per annual ton rebuild cost for the coke oven-blast furnace process it will replace. The process will enable the domestic steel industry to become more competitive by reducing its capital and operating cost. Furthermore, by eliminating the pollution problems associated with coke production and by completely enclosing the smelting reactions, this process represents a major step towards an environmentally friendly steel industry.

  1. Strategy for Meeting the Secretary of Energy and Hanford Site FY 2001 Pollution Prevention Goals

    SciTech Connect (OSTI)

    CLARK, D.E.

    2000-10-01T23:59:59.000Z

    The purpose of this strategy is to identify the Fiscal Year (FY) 2001 Hanford Site waste reduction, sanitary recycling and affirmative procurement goals and identify the action required to ensure that the Secretary of Energy's FY 2005 pollution prevention and the FY 2001 Hanford Site goals are met. The strategy and plan to ensure that the Secretary of Energy's routine waste reduction, recycling, cleanup/stabilization waste and affirmative procurement goals are met consists of four phases. The first phase is to ensure that the infrastructure is in place to support planning and organization. This phase involves ensuring that roles and responsibilities are identified; requirement documents are current; goals and successes are communicated; and accurate and current waste information is available. Roles and responsibilities are identified and the RL requirement documents (i.e., the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan and Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation) will specify the Secretary of Energy's goals. Goals will be communicated formally and informally via the Hanford Reach, training sessions, meetings and correspondence. Sharing of pollution prevention successes and goal progress are encouraged at the Pollution Prevention/Waste Minimization (PZ/WMin) quarterly meetings. Existing site waste generation databases will be utilized to provide current waste generation data. The second phase of the strategy and plan is to establish and allocate goals by prime contractor (i.e. Fluor Hanford, Inc. (FH), Pacific Northwest National Laboratory (PNNL), Bechtel Hanford Inc. (BHI), and CH2MHill Hanford Group (CHG)). This requires determining current status toward meeting the Secretary of Energy's goals; establishing the Hanford Site FY goals, and allocating waste reduction goals by prime contractor. The third phase of the strategy and plan is goal implementation. This phase involves the identification and implementation of corrective actions for problem areas identified either during the development of the Hanford Site goals or during monthly monitoring of the goals. Areas of concern identified during the development of the goals were the Mixed Low Level Waste (MLLW), Hazardous, and cleanup waste goal. The fourth phase of the strategy and plan is measuring results. This phase consists of: Measuring Results; Development of performance measures; and Reporting progress quarterly. The performance measures have been developed for the tracking of the waste reduction, sanitary recycling, affirmative procurement, and toxic chemical release goals. The first quarter performance measures tracking the recommended goals will be issued by January 3 I, 2001.

  2. Vehicle technologies heavy vehicle program : FY 2008 benefits analysis, methodology and results --- final report.

    SciTech Connect (OSTI)

    Singh, M.; Energy Systems; TA Engineering

    2008-02-29T23:59:59.000Z

    This report describes the approach to estimating the benefits and analysis results for the Heavy Vehicle Technologies activities of the Vehicle Technologies (VT) Program of EERE. The scope of the effort includes: (1) Characterizing baseline and advanced technology vehicles for Class 3-6 and Class 7 and 8 trucks, (2) Identifying technology goals associated with the DOE EERE programs, (3) Estimating the market potential of technologies that improve fuel efficiency and/or use alternative fuels, and (4) Determining the petroleum and greenhouse gas emissions reductions associated with the advanced technologies. In FY 08 the Heavy Vehicles program continued its involvement with various sources of energy loss as compared to focusing more narrowly on engine efficiency and alternative fuels. These changes are the result of a planning effort that first occurred during FY 04 and was updated in the past year. (Ref. 1) This narrative describes characteristics of the heavy truck market as they relate to the analysis, a description of the analysis methodology (including a discussion of the models used to estimate market potential and benefits), and a presentation of the benefits estimated as a result of the adoption of the advanced technologies. The market penetrations are used as part of the EERE-wide integrated analysis to provide final benefit estimates reported in the FY08 Budget Request. The energy savings models are utilized by the VT program for internal project management purposes.

  3. Tanks Focus Area (TFA) Site Needs Assessment FY 1999

    SciTech Connect (OSTI)

    RW Allen

    1999-05-03T23:59:59.000Z

    This report documents the process used by the Tanks Focus Area (TFA) to analyze and develop responses to technology needs submitted by five major U.S. Department of Energy (DOE) sites with radioactive tank waste problems, and the initial results of the analysis. The sites are the Hanford Site, Idaho National Engineering and Environmental Laboratory (INEEL), Oak Ridge Reservation (ORR), Savannah River Site (SRS), and West Valley Demonstration Project (WVDP). This is the fifth edition of the TFA site needs assessment. As with previous editions, this edition serves to provide the basis for accurately defining the TFA program for the upcoming fiscal year (FY), and adds definition to the program for up to 4 additional outyears. Therefore, this version distinctly defines the FY 2000 progrti and adds further definition to the FY 2001- FY 2004 program. Each year, the TFA reviews and amends its program in response to site users' science and technology needs.

  4. National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006

    SciTech Connect (OSTI)

    Ternes, Mark P [ORNL; Schweitzer, Martin [ORNL; Tonn, Bruce Edward [ORNL; Schmoyer, Richard L [ORNL; Eisenberg, Joel Fred [ORNL

    2007-02-01T23:59:59.000Z

    The U.S. Department of Energy's (DOE's) Weatherization Assistance Program was created by Congress in 1976 under Title IV of the Energy Conservation and Production Act. The purpose and scope of the Program as currently stated in the Code of Federal Regulations (CFR) 10CFR 440.1 is 'to increase the energy efficiency of dwellings owned or occupied by low-income persons, reduce their total residential expenditures, and improve their health and safety, especially low-income persons who are particularly vulnerable such as the elderly, persons with disabilities, families with children, high residential energy users, and households with high energy burden' (Code of Federal Regulations, 2005). DOE sponsored a comprehensive evaluation of the Program in the early 1990's to provide policy makers and program implementers with up-to-date and reliable information they needed for effective decision making and cost-effective operations. Oak Ridge National Laboratory (ORNL) managed the five part study which was based primarily on data from Program Year (PY) 1989 and supplemented by data from 1991-92 (Brown, Berry, and Kinney, 1994). In more recent years, ORNL has conducted four metaevaluations of the Program's energy savings using studies conducted by individual states between the years 1990-1996 (Berry, 1997), 1996-1998 (Schweitzer and Berry, 1999), 1993-2002 (Berry and Schweitzer, 2003), and 1993-2005 (Schweitzer, 2005). DOE announced through its Weatherization Program Notice 05-1 (DOE, 2004) that it would undertake a new national evaluation of the Program because the Program that was evaluated comprehensively in the early 1990's is vastly different from the Program of today. The Program has incorporated new funding sources, management principles, audit procedures, and energy-efficiency measures in response to findings and recommendations resulting from the 1989 National Evaluation, the Weatherization Plus strategic planning process, and other federal, state, and local initiatives. For example, the use of computerized audits has increased, cooling and baseload measures have been added, weatherization approaches tailored to the unique construction characteristics of mobile homes have been developed, the weatherization of large multifamily buildings has expanded and become more sophisticated, the flexibility to improve 'energy-related' health and safety has been provided, and leveraging with utilities, other state programs, and owners of large multifamily buildings has increased considerably. The Department of Energy tasked ORNL with planning the new evaluation in light of its experience in conducting the previous national evaluation and the metaevaluations. This preliminary evaluation plan, developed by ORNL, documents how the new national evaluation will be performed. In the remaining portion of this section, the purpose and fundamental questions the evaluation will address are identified and how these questions were derived is discussed.

  5. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    SciTech Connect (OSTI)

    SCHULTZ, E.A.

    1998-10-01T23:59:59.000Z

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  6. Atmospheric sciences division. Annual report, fiscal year 1981

    SciTech Connect (OSTI)

    Raynor, G.S. (ed.) [ed.

    1981-12-01T23:59:59.000Z

    The research activities of the Atmospheric Sciences Division of the Department of Energy and Environment for FY 1981 are presented. Facilities and major items of equipment are described. Research programs are summarized in three categories, modeling, field and laboratory experiments and data management and analysis. Each program is also described individually with title, principal investigator, sponsor and funding levels for FY 1981 and FY 1982. Future plans are summarized. Publications for FY 1981 are listed with abstracts. A list of personnel is included.

  7. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    SciTech Connect (OSTI)

    Not Listed

    2012-03-01T23:59:59.000Z

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  8. Japan, EU adamant about their proposals to host ITER, put off negotiations to next year; Joint construction plan involving Japan,

    E-Print Network [OSTI]

    Japan, EU adamant about their proposals to host ITER, put off negotiations to next year; Joint construction plan involving Japan, U.S. South Korea also emerging NIHON KEIZAI, December 20, 2004 Japan are likely to enter a crucial stage early in the next year. In addition to Japan and the EU, the United

  9. 1997 U.S. Department of Energy Strategic Plan

    SciTech Connect (OSTI)

    None,

    1997-09-01T23:59:59.000Z

    With the end of the Cold War and the election of President Clinton, the Department of Energy (DOE) set a new course which began with the publication of its first departmental strategic plan in April 1994. Entitled ``Fueling a Competitive Economy, it provided the framework and shared vision for meeting responsibilities in energy, national security, environmental quality, and science and technology. The strategic plan was the guidepost for the formulation of the Department`s FY 1996, FY 1997, and FY 1998 budgets and was critical to the development of the Department`s Strategic Alignment Initiative, designed to save $1.7 billion over five years. This current plan, which has been significantly improved through a very close consultation process with Congress and customers stakeholders, takes DOE to the next important performance level by being more directly linked to actions and results. It defines a strategic goal for each of the Department`s four business lines and, in the spirit of the Government Performance and Results Act and the National Performance Review, identifies a fifth goal addressing corporate management. Reengineering the business practices, managing for results, being open with neighbors and stakeholders, and ensuring the safety and health of DOE workers and the public are, and will continue to be, among the highest of priorities. Over the coming years, DOE plans to achieve their strategic goals through specific identifiable strategies. Each business line has clear objectives and straightforward ways of defining whether DOE has succeeded in meeting those objectives.

  10. Ohio University Strategic Planning Path, 2004-2016 Prompted by an interest in narrowing the scope of the Five Year Vision Ohio Implementation Plan (FYVOIP) and by new planning realities

    E-Print Network [OSTI]

    Botte, Gerardine G.

    2014 2015 2016 Presidential Task Force Vision OHIO Five Year Vision Ohio Implementation Plan Recession that fiscal and capital resources are stable and permit ongoing strategic investment. While work proceeded

  11. DOE Ofice of Civilian Radioactive Waste Management Systems studies plan, fiscal years 1991 and 1992. [Appendix lists system studies with respective abstracts

    SciTech Connect (OSTI)

    Wood, T W; Haffner, D R; Fletcher, J F

    1991-08-01T23:59:59.000Z

    The Systems Engineering Management Plan for the DOE Office of Civilian Radioactive Waste Management, which defines the systems engineering process for the Federal Radioactive Waste System (FWMS), requires that systems studies to support the integration, evaluation, and optimization of the system be identified. These studies are generally directed toward further defining system or system-element functional requirements, including interface requirements, evaluating alternative system configurations or operational rules, or optimizing design features to achieve system integration. Because the decisions based on these studies are conducted within the overall configuration management process, a consistent and documented framework for the identification and conduct of systems studies must be available. A planned approach is needed so that results from defensible and referenceable systems analyses are available to make informed decisions in a timely manner. This Plan covers top level'' studies (i.e., those involving system requirements generally and the definition of requirements for system elements). This Plan is focused on the FY 1991 and 1992 period, and will be updated periodically as required to ensure its currency. Proposed systems studies for FY 1991 and 1992, their recommended timing, and their relations to one another, current studies, and major program milestones are identified. In general, only those studies supporting monitored retrievable storage (MRS) design requirements are recommended for immediate initiation. The studies are grouped into five major decision groups to allow scheduling to support specific decision windows. The proposed system studies schedule is generally a conservative one, with studies occurring early in or before the associated decision window. These proposed studies are described in this Plan. 16 refs., 6 figs., 2 tabs.

  12. Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Volume 1

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The 1995 Hanford Mission Plan specifically addresses the tank waste issue and clarifies the link with other initiatives, such as improving management practices and the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE/RL-91-31). This document captures the results of decision making regarding the application of systems engineering at the Hanford Site, external involvement policy, and site end-state goals. Section 3.5 of the Hanford Mission Plan on Decisions and Directives provides an integrating discussion of the actions of the National Environmental Policy Act (NEPA), and DOE policy, guidance, and decisions associated with binding agreements such as the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Two significant components of the Hanford Mission Plan 1994 planning basis are (1) the decisions regarding the disposition of onsite material inventory, and the key programs and interfaces to accomplish this; and (2) the Program Interface Issues section, which identified issues that stretch across program boundaries.

  13. FY 2012 Appropriations for USGS Programs USGS FY12 Budget Request

    E-Print Network [OSTI]

    FY 2012 Appropriations for USGS Programs USGS FY12 Budget Request (numbers are in millions) USGS FY $1.118 billion in the President's FY 2012 budget request, $6.0 million (0.5 percent) above the FY enterprise, the President's FY 2012 budget request would change the structure of the USGS budget, moving USGS

  14. 2005-06 Annual Budget Instructions FY6/AppendixC.doc -1 -02-01-05

    E-Print Network [OSTI]

    Sheridan, Jennifer

    2005-06 Annual Budget Instructions FY6/AppendixC.doc - 1 - 02-01-05 A P P E N D I X C NUMERIC FUND;Office of Budget, Planning & Analysis FY6/AppendixC.doc - 2 - 02-01-05 NUMERIC CODE SOURCE DESCRIPTION; Principal Repayment, Interest, and Rebates #12;2005-06 Annual Budget Instructions FY6/AppendixC.doc - 3 - 02

  15. FY05 Targeted Technology Transfer to US Independents

    SciTech Connect (OSTI)

    Donald F. Duttlinger; E. Lance Cole

    2005-11-01T23:59:59.000Z

    Petroleum Technology Transfer Council (PTTC) was established by domestic crude oil and natural gas producers in 1994 as a national not-for-profit organization to address the increasingly urgent need to improve the technology-transfer process in the U.S. upstream petroleum industry. PTTC's technology-transfer programs enhance U.S. national security. PTTC administers the only nation-wide, comprehensive program dedicated to maximizing America's supplies of domestic oil and gas. PTTC conducts grassroots programs through 10 Regional Lead Organizations (RLOs) and two satellite offices, leveraging their preexisting connections with industry. This organizational structure helps bring researchers and academia to the table. Nationally and regionally, volunteers within a National Board and Regional Producer Advisory Groups guide efforts. The National Board meets three times per year, an important function being approving the annual plans and budgets developed by the regions and Headquarters (HQ). Between Board meetings, an active Management and Budget Committee guide HQ activity. PTTC itself undergoes a thorough financial audit each year. The PTTC's HQ staff plans and manages all aspects of the PTTC program, conducts nation-wide technology-transfer activities, and implements a comprehensive communications program. Networking, involvement in technical activities, and an active exhibit schedule are increasing PTTC's sphere of influence with both producers and the oilfield service sector. Circulation for ''PTTC Network News'', the quarterly newsletter, has risen to nearly 17,500. About 7,500 people receive an email Technology Alert on an approximate three-week frequency. Case studies in the ''Petroleum Technology Digest in World Oil'' appear monthly, as do ''Tech Connections'' columns in ''The American Oil and Gas Reporter''. As part of its oversight responsibility for the regions, the PTTC from the start has captured and reported data that document the myriad ways its programs impact industry. Of 119 workshops in FY05 where repeat attendance was reported, 59 percent of attendees on average had attended a PTTC event previously, indicating that a majority felt they were receiving enough value to come back. It also is encouraging that, after 11 years, PTTC events continue to attract new people. The form used at workshops to get participants feedback asks for a ''yes'' or ''no'' response to the question: ''Have you used any new technologies based on knowledge gained through PTTC?'' With data now available from 611 workshops, 41 percent of respondents said, ''yes'', confirming that people are applying the information they receive at PTTC workshops. PTTC in FY04 asked RLO directors, oilfield service companies and producers in 11 areas with significant technological barriers to adding new reserves to estimate the ''PTTC Impact Factor''--that is, the percentage of the total reserves added in their areas that logically could be attributed to PTTC's efforts. Of the estimated 1,266 million barrels of oil equivalent (BOE) added in the 11 areas, participants estimated that roughly 88 million BOE had been added as a result of PTTC's techtransfer efforts. PTTC's 10 regions are the primary delivery mechanism for technology transfer. Attendance at PTTC regional activities set a record in FY05, with 8,900 individuals attending 154 workshops, lunch-and-learn events, or student training and internships. When appropriate, regional workshops incorporate R&D findings from DOE-funded projects. This year HQ began a ''Microhole Technology Integration'' Initiative with DOE to more clearly present their microhole program to producers. Often events are held cooperatively with other national organizations, regional producer associations and professional society groups. This practice leverages outreach and engenders future cooperation. Of the more than 61,000 individuals PTTC has attracted to its events since its inception, more than 15,000 have attended in the past two years. Eight-eight percent of PTTC event attendees during FY05 were from industry. The numb

  16. NREL photovoltaic program FY 1997 annual report

    SciTech Connect (OSTI)

    McConnell, R.D.; Hansen, A.; Smoller, S.

    1998-06-01T23:59:59.000Z

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) going to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.

  17. Laboratory Directed Research and Development Program FY2004

    SciTech Connect (OSTI)

    Hansen, Todd C.

    2005-03-22T23:59:59.000Z

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE's National Laboratory System, Berkeley Lab supports DOE's missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation: (1) To perform leading multidisciplinary research in the computing sciences, physical sciences, energy sciences, biosciences, and general sciences in a manner that ensures employee and public safety and protection of the environment. (2) To develop and operate unique national experimental facilities for qualified investigators. (3) To educate and train future generations of scientists and engineers to promote national science and education goals. (4) To transfer knowledge and technological innovations and to foster productive relationships among Berkeley Lab's research programs, universities, and industry in order to promote national economic competitiveness. Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Goals that are codified in DOE's September 2003 Strategic Plan, with a primary focus on Advancing Scientific Understanding. For that goal, the Fiscal Year (FY) 2004 LDRD projects support every one of the eight strategies described in the plan. In addition, LDRD efforts support the goals of Investing in America's Energy Future (six of the fourteen strategies), Resolving the Environmental Legacy (four of the eight strategies), and Meeting National Security Challenges (unclassified fundamental research that supports stockpile safety and nonproliferation programs). The LDRD supports Office of Science strategic plans, including the 20 year Scientific Facilities Plan and the draft Office of Science Strategic Plan. The research also supports the strategic directions periodically under review by the Office of Science Program Offices, such as strategic LDRD projects germane to new research facility concepts and new fundamental science directions.

  18. FY 2007 Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA - Request1 02/10/03MayFY 20077

  19. FY 2007 Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA - Request1 02/10/03MayFY

  20. FY 2011 Financial Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA -MetricsBudget » FY 2011

  1. FY 2011 Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist. Category UC-lFederalFY 2008 FOIA -MetricsBudget » FY

  2. Facility stabilization project fiscal year 1997 multi-year work plan (MYWP) for WBS 7.1

    SciTech Connect (OSTI)

    Cartmell, D.B.

    1996-09-01T23:59:59.000Z

    This document contains the technical baseline, work breakdown structure, schedule baseline, cost baseline, and execution year for the facility stabilization project.

  3. N Reactor Deactivation Program Plan. Revision 4

    SciTech Connect (OSTI)

    Walsh, J.L.

    1993-12-01T23:59:59.000Z

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.

  4. National Renewable Energy Laboratory Sustainability Report FY 2009

    E-Print Network [OSTI]

    National Renewable Energy Laboratory Sustainability Report FY 2009 White Black NREL is a national by the Alliance for Sustainable Energy, LLC. #12;NOTICE: This report was prepared as an account of work sponsored. Design and planning for these highly energy-efficient buildings enable NREL to model sustainability

  5. Technology Innovation Program Programmatic Plan: FY 2011 FY 2014

    E-Print Network [OSTI]

    Magee, Joseph W.

    , Repair Manufacturing (#2) Manufacturing Processes for Advanced Materials Critical Processes Intelligent) Sustainability Technologies for personalized medicine (#5) Complex networks Manufacturing Advanced sensing Funding Opportunity), and on the TIP website. For additional information on specific societal challenge

  6. Oak Ridge National Laboratory institutional plan FY 1985-FY 1990

    SciTech Connect (OSTI)

    Not Available

    1984-11-01T23:59:59.000Z

    The primary mission of ORNL is to carry out applied research and engineering in fusion, fission, and other energy technologies, and scientific research in basic physical and life sciences. ORNL designs and provides research facilities. An important part of ORNL's mission is the manufacture and sale of radioactive and stable isotopes that are not available from the private sector. To fulfull its mission, ORNL focuses its scientific and technical efforts on: (1) magnetic fusion, with emphasis on applied plasma physics, experimental and design studies of confinement configurations, development of plasma heating and fueling systems, development of prototype superconducting confinement magnets, and testing of candidate first-wall and blanket materials; (2) nuclear fission, focused on development of nuclear fuel reprocessing, materials testing and development for high-temperature gas-cooled and advanced converter reactors, and technologies for managing nuclear waste; (3) biological and environemental research, with emphasis on interaction of energy-related physical and chemical agents with living organisms; (4) conservation and renewable energy, with emphasis on generic research for high-temperature materials, power systems, biomass production, energy storage, and technology development for buildings and industry; (5) fossil energy, focused on development of materials for fossil fuel applications and on health and environmental effects of coal conversion systems; and (6) basic research in physical sciences, with emphasis in materials research on radiation effects, neutron scattering, and photovoltaic conversion; in chemical science on aqueous solutions; and in nuclear physics on heavy-ion reactions.

  7. Annual Performance Report FY 2011 Annual Performance Plan FY...

    Energy Savers [EERE]

    meet organizational goals and objectives. Close attention will be paid to Investigations' infrastructure needs to ensure adequate skills, tools, and processes are in place to...

  8. Los Alamos National Laboratory Institutional Plan, FY 1983-FY 1988

    SciTech Connect (OSTI)

    Not Available

    1982-12-01T23:59:59.000Z

    The report is broken down into the following sections: director's overview; laboratory role and mission; description of the laboratory; scientific and technical activities; technology transfer program; personnel resources; university and industry interactions; site and facilities development; and resource projections and analyses. (GHT)

  9. Tanks focus area multiyear program plan FY97-FY99

    SciTech Connect (OSTI)

    NONE

    1996-08-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) continues to face a major tank remediation problem with approximately 332 tanks storing over 378,000 ml of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Most of the tanks have significantly exceeded their life spans. Approximately 90 tanks across the DOE complex are known or assumed to have leaked. Some of the tank contents are potentially explosive. These tanks must be remediated and made safe. How- ever, regulatory drivers are more ambitious than baseline technologies and budgets will support. Therefore, the Tanks Focus Area (TFA) began operation in October 1994. The focus area manages, coordinates, and leverages technology development to provide integrated solutions to remediate problems that will accelerate safe and cost-effective cleanup and closure of DOE`s national tank system. The TFA is responsible for technology development to support DOE`s four major tank sites: Hanford Site (Washington), INEL (Idaho), Oak Ridge Reservation (ORR) (Tennessee), and Savannah River Site (SRS) (South Carolina). Its technical scope covers the major functions that comprise a complete tank remediation system: safety, characterization, retrieval, pretreatment, immobilization, and closure.

  10. Oak Ridge National Laboratory Institutional Plan, FY 1991--FY 1996

    SciTech Connect (OSTI)

    Not Available

    1991-02-01T23:59:59.000Z

    The Oak Ridge National Laboratory -- one of DOE's major multiprogram laboratories -- focuses its resources on energy research and development (R D). To be able to meet these R D challenges, the Laboratory must achieve excellence in its operations relative to environmental, safety, and health (ES H) protection and to restore its aging facility infrastructure. ORNL's missions are carried out in compliance with all applicable ES H regulations. The Laboratory conducts applied R D in energy technologies -- in conservation; fission; magnetic fusion; health and environmental protection; waste management; renewable resources; and fossil energy. Experimental and theoretical research is undertaken to investigate fundamental problems in physical, chemical, materials, computational, biomedical, earth, and environmental sciences; to advance scientific knowledge; and to support energy technology R D. ORNL designs, builds, and operates unique research facilities for the benefit of university, industrial, and national laboratory researchers. The Laboratory serves as a catalyst in bringing national and international research elements together for important scientific and technical collaborations. ORNL helps to prepare the scientific and technical work force of the future by offering innovative and varied learning and R D experiences at the Laboratory for students and faculty from preschool level through postdoctoral candidates. The transfer of science and technology to US industries and universities is an integral component of ORNL's R D missions. ORNL also undertakes research and development for non-DOE sponsors when such work is synergistic with DOE mission. 66 figs., 55 tabs.

  11. Oak Ridge National Laboratory institutional plan, FY 1990--FY 1995

    SciTech Connect (OSTI)

    Not Available

    1989-11-01T23:59:59.000Z

    The Oak Ridge National Laboratory is one of DOE's major multiprogram energy laboratories. ORNL's program missions are (1) to conduct applied research and engineering development in support of DOE's programs in fusion, fission, fossil, renewables (biomass), and other energy technologies, and in the more efficient conversion and use of energy (conservation) and (2) to perform basic scientific research in selected areas of the physical and life sciences. These missions are to be carried out in compliance with environmental, safety, and health regulations. Transfer of science and technology is an integral component of our missions. A complementary mission is to apply the Laboratory's resources to other nationally important tasks when such work is synergistic with the program missions. Some of the issues addressed include education, international competitiveness, hazardous waste research and development, and selected defense technologies. In addition to the R D missions, ORNL performs important service roles for DOE; these roles include designing, building, and operating user facilities for the benefit of university and industrial researchers and supplying radioactive and stable isotopes that are not available from private industry. Scientific and technical efforts in support of the Laboratory's missions cover a spectrum of activities. In fusion, the emphasis is on advanced studies of toroidal confinement, plasma heating, fueling systems, superconducting magnets, first-wall and blanket materials, and applied plasma physics. 69 figs., 49 tabs.

  12. Strategic Sustainability Performance Plan FY 2010 FY 2020

    E-Print Network [OSTI]

    US Army Corps of Engineers

    .......................................... 15 Vf. Climate Change Risk and Vulnerability ....................................................................................................... 9 IVa. Internal Coordination and Communication ................................................................................................................. 15 VIa. Internal USACE Communication of Progress on EO 13514

  13. Annual Performance Report FY 2011 Annual Performance Plan FY 2012

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you0 ARRA NewslettersPartnership of the Americas |AnchorageAnnaof Office of

  14. Annual Performance Report FY 2010 Annual Performance Plan FY 2011 |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 RussianBy:Whether you're a16-17,2-13) AllDepartmentof Energy InDepartment of

  15. Annual Performance Report FY 2004 Annual Performance Plan FY 2005,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergyDepartment ofATVMAgriculturalAn1 Annual FOIA Report

  16. Annual Performance Report FY 2005 Annual Performance Plan FY 2006 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergyDepartment ofATVMAgriculturalAn1 Annual FOIA ReportDepartment of

  17. Annual Performance Report FY 2010 Annual Performance Plan FY 2011

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'s Reply Comments AT&T,FACT SAmesEnergy

  18. Our changing planet: The FY 1993 US global-change research program. A supplement to the US President's Fiscal Year 1993 budget

    SciTech Connect (OSTI)

    Not Available

    1992-01-01T23:59:59.000Z

    An improved predictive understanding of the integrated Earth system, including human interactions, will provide direct benefits by anticipating and planning for possible impacts on commerce, agriculture, energy, resource utilization, human safety, and environmental quality. The central goal of the U.S. Global Change Research Program (USGCRP) is to help establish the scientific understanding and the basis for national and international policymaking related to natural and human-induced changes in the global Earth system. This will be accomplished through: (1) establishing an integrated, comprehensive, long-term program of documenting the Earth system on a global scale; (2) conducting a program of focused studies to improve understanding of the physical, geological, chemical, biological, and social processes that influence the Earth system processes; and (3) developing integrated conceptual and predictive Earth system models.

  19. Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.

    SciTech Connect (OSTI)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2003-01-01T23:59:59.000Z

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receive credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.

  20. Research Councils UK The Government of India's 12th five-year plan (2012-2017) focuses

    E-Print Network [OSTI]

    Berzins, M.

    in India to align existing priorities and to scope areas of mutual research and policy interest. In doingResearch Councils UK engaging with India #12;The Government of India's 12th five-year plan (2012 in the global R&D rankings, India is clearly a partner of choice for the UK and the UK Research Councils. We