Powered by Deep Web Technologies
Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Table B8. Year Constructed, Number of Buildings, 1999  

U.S. Energy Information Administration (EIA) Indexed Site

B8. Year Constructed, Number of Buildings, 1999" B8. Year Constructed, Number of Buildings, 1999" ,"Number of Buildings (thousand)" ,"All Buildings","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999" "All Buildings ................",4657,419,499,763,665,774,846,690 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,227,270,359,321,367,413,390 "5,001 to 10,000 ..............",1110,107,102,240,166,193,156,145 "10,001 to 25,000 .............",708,63,90,97,84,130,179,65 "25,001 to 50,000 .............",257,13,20,39,53,44,43,44 "50,001 to 100,000 ............",145,7,9,19,24,26,33,27

2

Construction Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

North Execution - (2009 - 2011) North Execution - (2009 - 2011) Construction Project Number 2009 2010 2011 Project Description ANMLPL 0001C 76,675.32 - - Animas-Laplata circuit breaker and power rights CRGRFL 0001C - - 7,177.09 Craig Rifle Bay and transfer bay upgrade to 2000 amps; / Convert CRG RFL to 345 kV out of Bears Ear Sub FGE 0019C - - 39,207.86 Replace 69/25kV transformer KX2A at Flaming Gorge FGE 0020C - - 52,097.12 Flaming Gorge: Replace failed KW2A transformer HDN 0069C 16,638.52 208,893.46 3,704,578.33 Replace failed transformer with KZ1A 250 MVA 230/138kv

3

1999 Commercial Buildings Characteristics--Year Constructed  

U.S. Energy Information Administration (EIA) Indexed Site

Year Constructed Year Constructed Year Constructed More than one-third (37 percent) of the floorspace in commercial buildings was constructed since 1980 and more than one-half (55 percent) after 1969 (Figure 1). Less than one-third of floorspace was constructed before 1960. Detailed tables Figure 1. Distribution of Floorspace by Year Constructed, 1999 Figure 1. Distribution of Floorspace by Year Constructed, 1999. If having trouble viewing this page, please contact the National Energy Information Center at (202) 586-8800. Energy Information Administration Commercial Buildings Energy Consumption Survey Overall, relatively more buildings than floorspace were represented in the older age categories and more floorspace than buildings in the newer categories (see graphical comparison) because older buildings were smaller than more recently constructed buildings (Figure 2). Buildings constructed prior to 1960 were 11,700 square feet in size on average while those constructed after 1959 were 37 percent larger at 16,000 square feet per building.

4

Buildings*","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

B8. Year Constructed, Number of Buildings for Non-Mall Buildings, 2003" B8. Year Constructed, Number of Buildings for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)" ,"All Buildings*","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999","2000 to 2003" "All Buildings* ...............",4645,330,527,562,579,731,707,876,334 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2552,174,315,331,298,350,438,481,165 "5,001 to 10,000 ..............",889,71,107,90,120,180,98,158,66 "10,001 to 25,000 .............",738,55,64,90,95,122,103,151,58 "25,001 to 50,000 .............",241,19,23,26,33,48,32,39,21

5

Mo Year Report Period: EIA ID NUMBER:  

U.S. Energy Information Administration (EIA) Indexed Site

Version No: 2013.01 Mo Year Report Period: EIA ID NUMBER: http://www.eia.gov/survey/form/eia_14/instructions.pdf Mailing Address: Secure File Transfer option available at: (e.g., PO Box, RR) https://signon.eia.doe.gov/upload/noticeoog.jsp Electronic Transmission: The PC Electronic Zip Code - Data Reporting Option (PEDRO) is available. If interested in software, call (202) 586-9659. Email form to: OOG.SURVEYS@eia.doe.gov - - - - Fax form to: (202) 586-9772 Mail form to: Oil & Gas Survey Email address: U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 PADD 4 Type of Report (Check One ): (Thousands of dollars) (Thousands of barrels) PADD 2 PADD 3 PAD DISTRICT (a) Revision to Report:

6

Property:Building/YearConstruction2 | Open Energy Information  

Open Energy Info (EERE)

YearConstruction2 YearConstruction2 Jump to: navigation, search This is a property of type Date. Year of construction 2 (Year of construction) Pages using the property "Building/YearConstruction2" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 1921 + Sweden Building 05K0002 + 1999 + Sweden Building 05K0003 + 1960 + Sweden Building 05K0004 + 1914 + Sweden Building 05K0005 + 1940 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1900 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 1777 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1850 + Sweden Building 05K0014 + 1650 + Sweden Building 05K0015 + 1878 + Sweden Building 05K0016 + 1700 +

7

Property:Building/YearConstruction1 | Open Energy Information  

Open Energy Info (EERE)

YearConstruction1 YearConstruction1 Jump to: navigation, search This is a property of type Date. Year of construction 1 (taxation year) Subproperties This property has the following 1 subproperty: S Sweden Building 05K0004 Pages using the property "Building/YearConstruction1" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 2003 + Sweden Building 05K0002 + 27 June 2013 21:11:42 + Sweden Building 05K0003 + 27 June 2013 21:10:49 + Sweden Building 05K0005 + 27 June 2013 21:11:38 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1972 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 2004 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1992 +

8

Property:Building/YearConstruction | Open Energy Information  

Open Energy Info (EERE)

YearConstruction YearConstruction Jump to: navigation, search This is a property of type Date. Year of construction Pages using the property "Building/YearConstruction" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 2003 + Sweden Building 05K0002 + 1999 + Sweden Building 05K0003 + 1960 + Sweden Building 05K0004 + 1914 + Sweden Building 05K0005 + 1940 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1900 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 1777 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1850 + Sweden Building 05K0014 + 1650 + Sweden Building 05K0015 + 1878 + Sweden Building 05K0016 + 1700 + Sweden Building 05K0017 + 1987 +

9

Buildings","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

B9. Year Constructed, Floorspace, 1999" B9. Year Constructed, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999" "All Buildings ................",67338,4034,6445,9127,10866,11840,13931,11094 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6774,655,798,1025,928,1056,1153,1159 "5,001 to 10,000 ..............",8238,791,776,1777,1165,1392,1150,1188 "10,001 to 25,000 .............",11153,972,1504,1488,1267,2045,2767,1110 "25,001 to 50,000 .............",9311,489,673,1343,1987,1587,1594,1638

10

Proposal Budget Form for(Project Number), Year 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

,,,"Year 1",,,"Year 2","Cummulative" "Budget Category (add categories if needed)",,,"Total",,,"Total","Total" "Labor (# hrs/hourly rate required) by job category","# hrs","$ / hr",,"# hrs","$ / hr" " Faculty" " Name" " Name" " Name " " Post Doc " " Grad Student " " Undergrad" " Other Professional " "Fringe Benefit Cost and %" " PI/Faculty, %" " Post Docs, %" " Graduate Students, %" " Undergraduate Students, %" " Other Professional, %" "Travel (designate if travel to INL)"

11

The d-Logic of the Rational Numbers: A Fruitful Construction  

Science Conference Proceedings (OSTI)

We present a geometric construction that yields completeness results for modal logics including K4, KD4, GL and GL ... Keywords: Modal logic, derivative/derived set operator, topological semantics, trees

Joel Lucero-Bryan

2011-03-01T23:59:59.000Z

12

Name Address Place Zip Sector Product Stock Symbol Year founded Number  

Open Energy Info (EERE)

Address Place Zip Sector Product Stock Symbol Year founded Number Address Place Zip Sector Product Stock Symbol Year founded Number of employees Number of employees Telephone number Website Coordinates Region ABS Alaskan Inc Van Horn Rd Fairbanks Alaska Gateway Solar Wind energy Marine and Hydrokinetic Solar PV Solar thermal Wind Hydro Small scale wind turbine up to kW and solar systems distributor http www absak com United States AER NY Kinetics LLC PO Box Entrance Avenue Ogdensburg Marine and Hydrokinetic United States AW Energy Lars Sonckin kaari Espoo FI Marine and Hydrokinetic http www aw energy com Finland AWS Ocean Energy formerly Oceanergia Redshank House Alness Point Business Park Alness Ross shire IV17 UP Marine and Hydrokinetic http www awsocean com United Kingdom Able Technologies Audubon Road Englewood Marine and Hydrokinetic http

13

Number  

Office of Legacy Management (LM)

' ' , /v-i 2 -i 3 -A, This dow'at consists ~f--~-_,_~~~p.~,::, Number -------of.-&--copies, 1 Series.,-a-,-. ! 1 THE UNIVERSITY OF ROCHESTER 1; r-.' L INTRAMURALCORRESPONDENCE i"ks' 3 2.. September 25, 1947 Memo.tor Dr. A. H, Dovdy . From: Dr. H. E, Stokinger Be: Trip Report - Mayvood Chemical Works A trip vas made Nednesday, August 24th vith Messrs. Robert W ilson and George Sprague to the Mayvood Chemical F!orks, Mayvood, New Jersey one of 2 plants in the U.S.A. engaged in the production of thorium compounds. The purpose of the trip vas to: l 1. Learn the type of chemical processes employed in the thorium industry (thorium nitrate). 2. Survey conditions of eeosure of personnel associated vith these chemical processes. 3. Obtain samples of atmospheric contaminants in the plant, as

14

Table HC1-2a. Housing Unit Characteristics by Year of Construction,  

U.S. Energy Information Administration (EIA) Indexed Site

2a. Housing Unit Characteristics by Year of Construction, 2a. Housing Unit Characteristics by Year of Construction, Million U.S. Households, 2001 Housing Unit Characteristics RSE Column Factor: Total Year of Construction RSE Row Factors 1990 to 2001 1 1980 to 1989 1970 to 1979 1960 to 1969 1950 to 1959 1949 or Before 0.5 1.6 1.2 1.0 1.1 1.1 0.8 Total ............................................... 107.0 15.5 18.2 18.8 13.8 14.2 26.6 4.3 Census Region and Division Northeast ...................................... 20.3 1.5 2.4 2.1 2.8 3.0 8.5 8.8 New England .............................. 5.4 0.4 0.7 0.4 0.8 0.9 2.3 11.3 Middle Atlantic ............................ 14.8 1.1 1.7 1.7 2.0 2.2 6.2 11.2 Midwest ......................................... 24.5 2.8 3.7 3.6 2.9 3.5 8.1 10.2 East North Central ...................... 17.1 2.0 2.5 2.5 2.0 2.6 5.5 11.9

15

Options in the Eleventh Year for Interim Standard Offer Number Four Contracts  

SciTech Connect

The Interim Standard Offer Number Four Contracts (ISM), under which most of the geothermal industry is selling power (outside of The Geysers), has an initial ten year period of known fixed energy payments. In the eleventh year, the price goes to the Avoided Cost of the buying utility. The specific contract language is ''Seller will be paid at a rate equal to the utilities' published avoided cost of energy as updated and authorized by the Commission (CPUC)''. The first geothermal contract will reach the end of the initial 10 year period in early 1994, a few will end in 1995 and 1996, and the majority will end in the 1997-2000 period. This is beginning to be focused upon by the utilities, lenders and, of course, the operators themselves. The prime reason for focusing on the issue is that avoided costs of the utilities directly track the delivered cost of the natural gas, and most forecasts are showing that the price of gas in the eleventh year of the contracts will be significantly lower than the last year of the fixed period of energy payments. There are many forums in which the predication of natural gas prices are discussed. In the State of California, the agency responsible for the official forecast is the California Energy Commission. Every two years, the CEC holds hearings for input into its biennial Fuels Report (FR) which establishes the forecast of natural gas prices in addition to other parameters which are used in the planning process. The attached Exhibit I is an excerpt out of the 1991 Fuels Report (FR91). Figure 1 compares the forecast of FR89 and FR91 for the Utility Electric Generation (UEG) in PG&E's service area, and Figure 2, the forecast in the SOCAL service area. The FR91 SOCAL service area forecast indicates a bottoming of the gas price in 1994 at $2.50/mmbtu. Recent prices in 1992 are already at these levels. Converting this to an avoided energy cost brings about a price of 2 to 2-1/2 Cents/kWh. The 1992 energy price in the IS04 contract is 9.3 Cents/kWh.

Hinrichs, Thomas C.

1992-03-24T23:59:59.000Z

16

Options in the Eleventh Year for Interim Standard Offer Number Four Contracts  

DOE Green Energy (OSTI)

The Interim Standard Offer Number Four Contracts (ISM), under which most of the geothermal industry is selling power (outside of The Geysers), has an initial ten year period of known fixed energy payments. In the eleventh year, the price goes to the Avoided Cost of the buying utility. The specific contract language is ''Seller will be paid at a rate equal to the utilities' published avoided cost of energy as updated and authorized by the Commission (CPUC)''. The first geothermal contract will reach the end of the initial 10 year period in early 1994, a few will end in 1995 and 1996, and the majority will end in the 1997-2000 period. This is beginning to be focused upon by the utilities, lenders and, of course, the operators themselves. The prime reason for focusing on the issue is that avoided costs of the utilities directly track the delivered cost of the natural gas, and most forecasts are showing that the price of gas in the eleventh year of the contracts will be significantly lower than the last year of the fixed period of energy payments. There are many forums in which the predication of natural gas prices are discussed. In the State of California, the agency responsible for the official forecast is the California Energy Commission. Every two years, the CEC holds hearings for input into its biennial Fuels Report (FR) which establishes the forecast of natural gas prices in addition to other parameters which are used in the planning process. The attached Exhibit I is an excerpt out of the 1991 Fuels Report (FR91). Figure 1 compares the forecast of FR89 and FR91 for the Utility Electric Generation (UEG) in PG&E's service area, and Figure 2, the forecast in the SOCAL service area. The FR91 SOCAL service area forecast indicates a bottoming of the gas price in 1994 at $2.50/mmbtu. Recent prices in 1992 are already at these levels. Converting this to an avoided energy cost brings about a price of 2 to 2-1/2 Cents/kWh. The 1992 energy price in the IS04 contract is 9.3 Cents/kWh.

Hinrichs, Thomas C.

1992-03-24T23:59:59.000Z

17

Smart moves in superfund - revitalization one year later. Volume 1, Number 3, January 1993. Bulletin  

SciTech Connect

The issue of the Smart Moves in Superfund bulletin series provides an update on the revitalization effort, highlighting National Priorities List (NPL) construction completions, accelerating cleanup, the Superfund Accelerated Cleanup Model, risk assessment/risk management, contracts management, enforcement policy/equity, interagency cooperation, public forms, and state meetings.

Not Available

1993-01-01T23:59:59.000Z

18

Buildings*","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

"District Heat ...",5166,"Q",1203,661,786,573,780,691,"Q" "Boilers ...",20423,1926,2744,3081,2957,3339,2803,2257,1316 "Packaged...

19

New Mexico Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

(Number of Elements) New Mexico Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

20

New Mexico Natural Gas Number of Commercial Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

(Number of Elements) New Mexico Natural Gas Number of Commercial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1980's...

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Gravel road test sections insulated with scrap tire chips: Construction and the first year's results. Special report  

Science Conference Proceedings (OSTI)

A test project that uses tire chips as an insulating layer to limit frost penetration beneath a gravel-surfaced road is described. Tire chips, which are waste tires that have been cut into 2-in. pieces, are an attractive alternative to conventional insulation boards because they have moderate thermal resistance and are durable, free-draining and low cost. Furthermore, this application has the potential to make an important contribution to disposing of the more than 2 billion waste tires that are currently sitting in huge open piles across the U.S. The project was constructed in Richmond, Maine, in August 1992. It is 750 ft long, consisting of five sections with different thicknesses of tire chips and overlying soil cover and two control sections. Over 20,000 waste tires were used on this project. The primary goals were to determine the necessary thickness of tire chips to provide effective insulation and the minimum thickness of overlying soil cover needed to produce a stable riding surface. The thickness of the tire chip layers ranges from 6 to 12 in., while the thickness of the granular soil cover ranges from 12 to 24 in. The project is instrumented with thermocouples, resistivity gauges, groundwater monitoring wells and a weather station. In addition, the strength of the road surface is periodically measured with a heavy weight deflectometer. Results from the first year of service have shown that a 6-in. tire chip layer can reduce frost penetration by up to 25% and the gravel cover should be 12 to 18 in. thick to provide a stable riding surface.

Eaton, R.A.; Roberts, R.J.; Humphrey, D.N.

1994-08-01T23:59:59.000Z

22

Utah Natural Gas Number of Commercial Consumers (Number of Elements...  

Gasoline and Diesel Fuel Update (EIA)

Commercial Consumers (Number of Elements) Utah Natural Gas Number of Commercial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

23

Utah Natural Gas Number of Industrial Consumers (Number of Elements...  

U.S. Energy Information Administration (EIA) Indexed Site

Industrial Consumers (Number of Elements) Utah Natural Gas Number of Industrial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

24

Ohio Natural Gas Number of Commercial Consumers (Number of Elements...  

Gasoline and Diesel Fuel Update (EIA)

Commercial Consumers (Number of Elements) Ohio Natural Gas Number of Commercial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

25

Ohio Natural Gas Number of Industrial Consumers (Number of Elements...  

U.S. Energy Information Administration (EIA) Indexed Site

Industrial Consumers (Number of Elements) Ohio Natural Gas Number of Industrial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

26

Proposal Budget Form for(Project Number), Year 1",,,," (May 01)",,,,"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

,,,," (May 01)",,,," (May 01)",,,," (May 01)" ,,,," (May 01)",,,," (May 01)",,,," (May 01)" ,,,,"Year 1",,,,"Year 2",,,,"Year 3","Cummulative" "Budget Category (add categories if needed)",,,,"Total",,,,"Total",,,,"Total","Total" "Labor (# hrs/hourly rate required) by job category","# hrs","$ / hr",,,"# hrs","$ / hr",,,"# hrs","$ / hr" " PI (Name; INCLUDE CV FOR EACH degreed person",96.5,50,,4825,96.5,50,,4825,96.5,50,,4825,14475 " Faculty",,,,0,,,,0,,,,0,0 " Name",,,,0,,,,0,,,,0,0 " Name",,,,0,,,,0,,,,0,0 " Name ",45,25,,1125,45,25,,1125,45,25,,1125,3375

27

Utah Natural Gas Number of Residential Consumers (Number of Elements...  

Annual Energy Outlook 2012 (EIA)

Residential Consumers (Number of Elements) Utah Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

28

Illinois Natural Gas Number of Industrial Consumers (Number of...  

Annual Energy Outlook 2012 (EIA)

Industrial Consumers (Number of Elements) Illinois Natural Gas Number of Industrial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

29

Wisconsin Natural Gas Number of Industrial Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Industrial Consumers (Number of Elements) Wisconsin Natural Gas Number of Industrial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

30

Wisconsin Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Wisconsin Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

31

Wisconsin Natural Gas Number of Commercial Consumers (Number...  

Annual Energy Outlook 2012 (EIA)

Commercial Consumers (Number of Elements) Wisconsin Natural Gas Number of Commercial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

32

California Natural Gas Number of Industrial Consumers (Number...  

Gasoline and Diesel Fuel Update (EIA)

Industrial Consumers (Number of Elements) California Natural Gas Number of Industrial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

33

California Natural Gas Number of Commercial Consumers (Number...  

Gasoline and Diesel Fuel Update (EIA)

Commercial Consumers (Number of Elements) California Natural Gas Number of Commercial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

34

Ohio Natural Gas Number of Residential Consumers (Number of Elements...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Ohio Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

35

Colorado Natural Gas Number of Industrial Consumers (Number of...  

U.S. Energy Information Administration (EIA) Indexed Site

Industrial Consumers (Number of Elements) Colorado Natural Gas Number of Industrial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

36

Colorado Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Colorado Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

37

Colorado Natural Gas Number of Commercial Consumers (Number of...  

Gasoline and Diesel Fuel Update (EIA)

Commercial Consumers (Number of Elements) Colorado Natural Gas Number of Commercial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

38

Vermont Natural Gas Number of Residential Consumers (Number of...  

Gasoline and Diesel Fuel Update (EIA)

Residential Consumers (Number of Elements) Vermont Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

39

Vermont Natural Gas Number of Industrial Consumers (Number of...  

Annual Energy Outlook 2012 (EIA)

Industrial Consumers (Number of Elements) Vermont Natural Gas Number of Industrial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

40

Vermont Natural Gas Number of Commercial Consumers (Number of...  

Annual Energy Outlook 2012 (EIA)

Commercial Consumers (Number of Elements) Vermont Natural Gas Number of Commercial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Michigan Natural Gas Number of Residential Consumers (Number...  

Gasoline and Diesel Fuel Update (EIA)

Residential Consumers (Number of Elements) Michigan Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

42

Michigan Natural Gas Number of Industrial Consumers (Number of...  

Annual Energy Outlook 2012 (EIA)

Industrial Consumers (Number of Elements) Michigan Natural Gas Number of Industrial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

43

Idaho Natural Gas Number of Industrial Consumers (Number of Elements...  

Annual Energy Outlook 2012 (EIA)

Industrial Consumers (Number of Elements) Idaho Natural Gas Number of Industrial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

44

Idaho Natural Gas Number of Commercial Consumers (Number of Elements...  

Annual Energy Outlook 2012 (EIA)

Commercial Consumers (Number of Elements) Idaho Natural Gas Number of Commercial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

45

Idaho Natural Gas Number of Residential Consumers (Number of...  

Annual Energy Outlook 2012 (EIA)

Residential Consumers (Number of Elements) Idaho Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

46

Hawaii Natural Gas Number of Residential Consumers (Number of...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Hawaii Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

47

Kentucky Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Kentucky Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

48

Tennessee Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Tennessee Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

49

Maryland Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Maryland Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

50

Louisiana Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Louisiana Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

51

Alabama Natural Gas Number of Residential Consumers (Number of...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Alabama Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

52

Oklahoma Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Oklahoma Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

53

Alaska Natural Gas Number of Residential Consumers (Number of...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Alaska Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

54

Kansas Natural Gas Number of Residential Consumers (Number of...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Kansas Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

55

Illinois Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Illinois Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

56

Maine Natural Gas Number of Residential Consumers (Number of...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Maine Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

57

Florida Natural Gas Number of Residential Consumers (Number of...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Florida Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

58

Iowa Natural Gas Number of Residential Consumers (Number of Elements...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Iowa Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

59

Georgia Natural Gas Number of Residential Consumers (Number of...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Georgia Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

60

Arkansas Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Arkansas Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Missouri Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Missouri Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

62

Montana Natural Gas Number of Residential Consumers (Number of...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Montana Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

63

Nevada Natural Gas Number of Residential Consumers (Number of...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Nevada Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

64

Arizona Natural Gas Number of Residential Consumers (Number of...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Arizona Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

65

Nebraska Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Nebraska Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

66

Minnesota Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Minnesota Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

67

Delaware Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Delaware Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

68

New Mexico Natural Gas Number of Industrial Consumers (Number...  

Annual Energy Outlook 2012 (EIA)

Industrial Consumers (Number of Elements) New Mexico Natural Gas Number of Industrial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

69

Texas Natural Gas Number of Commercial Consumers (Number of Elements...  

Gasoline and Diesel Fuel Update (EIA)

Commercial Consumers (Number of Elements) Texas Natural Gas Number of Commercial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

70

Texas Natural Gas Number of Residential Consumers (Number of...  

Annual Energy Outlook 2012 (EIA)

Residential Consumers (Number of Elements) Texas Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

71

YEAR  

National Nuclear Security Administration (NNSA)

1 1 YEAR 2011 Males 18 Females 23 YEAR 2011 SES 2 EJ/EK 2 NQ (Prof/Tech/Admin) 35 NU (Tech/Admin Support) 2 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 9 Asian Male 0 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 12 White Female 6 DIVERSITY Workforce Diversity Associate Administrator for Information Management & Chief Information Officer, NA-IM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 18 43.9% 23 56.1% Gender Males Females 4.9% 4.9% 85.4% 4.9% Pay Plan SES EJ/EK NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 2.4% 4.9% 7.3% 22.0% 0.0% 0.0% 4.9% 14.6% 29.3% 14.6% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

72

YEAR  

National Nuclear Security Administration (NNSA)

4 4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 31 NU (Tech/Admin Support) 5 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 10 White Male 13 White Female 10 DIVERSITY Workforce Diversity Office of General Counsel, NA-GC As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 21 47.7% 23 52.3% Gender Males Females 6.8% 2.3% 2.3% 6.8% 70.5% 11.4% Pay Plan SES EJ/EK EN 03 NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.0% 0.0% 2.3% 4.5% 2.3% 2.3% 13.6% 22.7% 29.5% 22.7% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

73

YEAR  

National Nuclear Security Administration (NNSA)

6 6 YEAR 2011 Males 7 Females 9 YEAR 2011 SES 1 NQ (Prof/Tech/Admin) 9 GS 15 2 GS 13 2 GS 12 1 GS 11 1 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 4 White Female 6 DIVERSITY Workforce Diversity Associate Administrator of External Affairs, NA-EA As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 7 43.8% 9 56.3% Gender Males Females 6.3% 56.3% 12.5% 12.5% 6.3% 6.3% Pay Plan SES NQ (Prof/Tech/Admin) GS 15 GS 13 GS 12 GS 11 0.0% 0.0% 6.3% 18.8% 6.3% 0.0% 6.3% 0.0% 25.0% 37.5% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male Hispanic Female White Male White Female FY11 Workforce Diversity

74

YEAR  

National Nuclear Security Administration (NNSA)

40 40 YEAR 2011 Males 68 Females 72 YEAR 2011 SES 5 EJ/EK 1 NN (Engineering) 16 NQ (Prof/Tech/Admin) 115 NU (Tech/Admin Support) 3 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 7 Asian Male 4 Asian Female 0 Hispanic Male 25 Hispanic Female 26 White Male 35 White Female 37 DIVERSITY Workforce Diversity Associate Administrator for Acquistion & Project Management, NA-APM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 68 48.6% 72 51.4% Gender Males Females 3.6% 0.7% 11.4% 82.1% 2.1% Pay Plan SES EJ/EK NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.7% 1.4% 2.1% 5.0% 2.9% 0.0% 17.9% 18.6% 25.0% 26.4% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male

75

Representational change and strategy use in children's number line estimation during the first years of primary school  

E-Print Network (OSTI)

Site, CB2 3EB, UK Full list of author information is available at the end of the article White and Sz?cs Behavioral and Brain Functions 2012, 8:1 http://www.behavioralandbrainfunctions.com/content/8/1/1 © 2012 White and Sz?cs; licensee BioMed Central... ]. Ebersbach et al. [8] posited a model composed of two linear segments, with the change point White and Sz?cs Behavioral and Brain Functions 2012, 8:1 http://www.behavioralandbrainfunctions.com/content/8/1/1 Page 2 of 12 an indicator of number familiarity...

White, Sonia LJ; Szucs, Denes

2012-01-04T23:59:59.000Z

76

Spent nuclear fuels project: FY 1995 multi-year program plan, WBS {number_sign}1.4  

SciTech Connect

The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan.

Denning, J.L.

1994-09-01T23:59:59.000Z

77

Connecticut Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Connecticut Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

78

Mississippi Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Mississippi Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

79

Pennsylvania Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Pennsylvania Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

80

Massachusetts Natural Gas Number of Residential Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Massachusetts Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Years  

NLE Websites -- All DOE Office Websites (Extended Search)

and Technology in and Technology in the National Interest 60 Years of Excellence Lawrence Livermore National Laboratory FY 2012 Annual Report About the Cover: Lawrence Livermore National Laboratory (LLNL) engineers Chris Spadaccini (left) and Eric Duoss are shown experimenting with direct ink-writing to create micro- to macroscale structures with extreme precision. The Laboratory is advancing this process and other additive manufacturing technologies to develop new materials with extraordinary properties for use in a wide range of national-security and other applications. About the Laboratory: Lawrence Livermore National Laboratory was founded in 1952 to enhance the security of the United States by advancing nuclear weapons science and technology. With a talented and dedicated workforce and

82

Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1  

Science Conference Proceedings (OSTI)

The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

Wells, J.L.

1997-03-01T23:59:59.000Z

83

DOE Hydrogen and Fuel Cells Program Record 11002: Number of Cars Equivalent to 100 Metric Tons of Avoided Greenhouse Gases per Year  

NLE Websites -- All DOE Office Websites (Extended Search)

02 Date: January 5, 2011 02 Date: January 5, 2011 Title: Number of Cars Equivalent to 100 Metric Tons of Avoided Greenhouse Gases per Year Originator: Andrea Chew & Tien Nguyen Approved by: Sunita Satyapal Date: January 25, 2011 A conventional mid-size gasoline car emits 0.45 kg of greenhouse gases (GHG) per mile. 1 One hundred (100) metric tons (t) of GHG per year are equivalent to emissions from 17 conventional gasoline cars. Item: The GHG emissions cited above are from an analysis record prepared by the Department of Energy's Fuel Cell Technologies and Vehicle Technologies Programs on life-cycle emissions of greenhouse gases and petroleum use for several light-duty vehicles. 1 For cars that are between 1 and 5 years old, the average mileage is approximately 13,000,

84

3rd year final contractor report for: U.S. Department of Energy Stewardship Science Academic Alliances Program Project Title: Detailed Measurements of Rayleigh-Taylor Mixing at Large and Small Atwood Numbers  

Science Conference Proceedings (OSTI)

This project had two major tasks: Task 1. The construction of a new air/helium facility to collect detailed measurements of Rayleigh-Taylor (RT) mixing at high Atwood number, and the distribution of these data to LLNL, LANL, and Alliance members for code validation and design purposes. Task 2. The collection of initial condition data from the new Air/Helium facility, for use with validation of RT simulation codes at LLNL and LANL. This report describes work done in the last twelve (12) months of the project, and also contains a summary of the complete work done over the three (3) life of the project. As of April 1, 2006, the air/helium facility (Task 1) is now complete and extensive testing and validation of diagnostics has been performed. Initial condition studies (Task 2) is also comp lete. Detailed experiments with air/helium with Atwood numbers up to 0.1 have been completed, and Atwood numbers of 0.25. Within the last three (3) months we have been able to successfully run the facility at Atwood numbers of 0.5. The progress matches the project plan, as does the budget. We have finished the initial condition studies using the water channel, and this work has been accepted for publication on the Journal of Fluid Mechanics (the top fluid mechanics journal). Mr. Nick Mueschke and Mr. Wayne Kraft are continuing with their studies to obtain PhDs in the same field, and will also continue their collaboration visits to LANL and LLNL. Over its three (3) year life the project has supported two(2) Ph.D.’s and three (3) MSc’s, and produced nine (9) international journal publications, twenty four (24) conference publications, and numerous other reports. The highlight of the project has been our close collaboration with LLNL (Dr. Oleg Schilling) and LANL (Drs. Dimonte, Ristorcelli, Gore, and Harlow).

Malcolm J. Andrews

2006-04-14T23:59:59.000Z

85

Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2317&D2). Remedial actions performed in the Balance of Site (BOS) Laboratory Area of EU Z2-33 and two small areas in EU Z2-42 are described in Sects. 5 through 10 of this Phased Construction Completion Report (PCCR). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for EU Z2-33; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe RAs performed in the EU Z2-33 BOS Laboratory Area and two small areas in EU Z2-42. Approximately 18 acres in EU Z2-33 are addressed in this PCCR. Based on the results of the DVS evaluation and RAs performed, all 18 acres are recommended for unrestricted industrial use to 10 ft bgs. Three Federal Facility Agreement sites are addressed and recommended for no further action within this acreage, including: (1) K-1004-L Recirculating Cooling Water Lines Leak Sites; (2) K-1044 Heavy Equipment Repair Shop; and (3) K-1015-A Laundry Pit. Remedial actions for EU Z2-33 were developed in response to DVS characterization results described in the EU Z2-33 Technical Memorandum (Appendix A) and to support reindustrialization of the East Tennessee Technology Park as a commercial industrial park. Remediation criteria were designed for the protection of a future industrial worker who normally would not have the potential for exposure to soil below 10ft bgs. Accordingly, the Zone 2 ROD required land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likel

Bechtel Jacobs

2008-09-11T23:59:59.000Z

86

Wanzek Construction | Open Energy Information  

Open Energy Info (EERE)

Wanzek Construction Wanzek Construction Jump to: navigation, search Logo: Wanzek Construction Name Wanzek Construction Address 2028 2nd Avenue NW Place West Fargo, ND Zip 58078 Country United States Sector Geothermal energy, Renewable Energy, Solar, Wind energy Product Turnkey Construction Services Stock Symbol MTZ Year founded 1971 Number of employees 1100 Company Type For Profit Company Ownership Public Small Business No Minority Business Yes Affiliated Companies MasTec N.A; MasTec Renewables; Phone number 2816064172 Website http://www.wanzek.com Coordinates 29.78577°, -95.66735° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.78577,"lon":-95.66735,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

87

Missouri Natural Gas Number of Gas and Gas Condensate ...  

U.S. Energy Information Administration (EIA)

Missouri Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6

88

RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2012, Nevada National Security Site, Nevada  

SciTech Connect

This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101, issued 10/17/10.

,

2013-02-21T23:59:59.000Z

89

RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2011  

SciTech Connect

This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream; a description and quantity of each waste stream in tons and cubic feet received at the facility; the method of treatment, storage, and/or disposal for each waste stream; a description of the waste minimization efforts undertaken; a description of the changes in volume and toxicity of waste actually received; any unusual occurrences; and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101.

NSTec Environmental Restoration

2012-02-16T23:59:59.000Z

90

New Mexico Natural Gas Number of Residential Consumers - Sales...  

U.S. Energy Information Administration (EIA) Indexed Site

Sales (Number of Elements) New Mexico Natural Gas Number of Residential Consumers - Sales (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

91

New Mexico Natural Gas Number of Industrial Consumers - Sales...  

U.S. Energy Information Administration (EIA) Indexed Site

Sales (Number of Elements) New Mexico Natural Gas Number of Industrial Consumers - Sales (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

92

Utah Natural Gas Number of Gas and Gas Condensate Wells (Number...  

Annual Energy Outlook 2012 (EIA)

Gas and Gas Condensate Wells (Number of Elements) Utah Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

93

Arizona Natural Gas Number of Gas and Gas Condensate Wells (Number...  

Annual Energy Outlook 2012 (EIA)

Gas and Gas Condensate Wells (Number of Elements) Arizona Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

94

Kansas Natural Gas Number of Gas and Gas Condensate Wells (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Gas and Gas Condensate Wells (Number of Elements) Kansas Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

95

Alaska Natural Gas Number of Gas and Gas Condensate Wells (Number...  

Annual Energy Outlook 2012 (EIA)

Gas and Gas Condensate Wells (Number of Elements) Alaska Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

96

Montana Natural Gas Number of Gas and Gas Condensate Wells (Number...  

Annual Energy Outlook 2012 (EIA)

Gas and Gas Condensate Wells (Number of Elements) Montana Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

97

Wyoming Natural Gas Number of Gas and Gas Condensate Wells (Number...  

Gasoline and Diesel Fuel Update (EIA)

Gas and Gas Condensate Wells (Number of Elements) Wyoming Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

98

Indiana Natural Gas Number of Gas and Gas Condensate Wells (Number...  

Gasoline and Diesel Fuel Update (EIA)

Gas and Gas Condensate Wells (Number of Elements) Indiana Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

99

Nevada Natural Gas Number of Gas and Gas Condensate Wells (Number...  

Annual Energy Outlook 2012 (EIA)

Gas and Gas Condensate Wells (Number of Elements) Nevada Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

100

Oregon Natural Gas Number of Gas and Gas Condensate Wells (Number...  

Annual Energy Outlook 2012 (EIA)

Gas and Gas Condensate Wells (Number of Elements) Oregon Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Alabama Natural Gas Number of Gas and Gas Condensate Wells (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Gas and Gas Condensate Wells (Number of Elements) Alabama Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

102

Ohio Natural Gas Number of Gas and Gas Condensate Wells (Number...  

Annual Energy Outlook 2012 (EIA)

Gas and Gas Condensate Wells (Number of Elements) Ohio Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

103

Texas Natural Gas Number of Gas and Gas Condensate Wells (Number...  

Gasoline and Diesel Fuel Update (EIA)

Gas and Gas Condensate Wells (Number of Elements) Texas Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

104

Electrochemical construction  

DOE Patents (OSTI)

An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

Einstein, Harry (Springfield, NJ); Grimes, Patrick G. (Westfield, NJ)

1983-08-23T23:59:59.000Z

105

New Mexico Natural Gas Number of Commercial Consumers - Sales...  

U.S. Energy Information Administration (EIA) Indexed Site

- Sales (Number of Elements) New Mexico Natural Gas Number of Commercial Consumers - Sales (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

106

Nebraska Natural Gas Number of Gas and Gas Condensate Wells ...  

U.S. Energy Information Administration (EIA)

Nebraska Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1980's: 15:

107

Mississippi Natural Gas Number of Gas and Gas Condensate Wells ...  

U.S. Energy Information Administration (EIA)

Mississippi Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1980's:

108

Hackney Construction | Open Energy Information  

Open Energy Info (EERE)

Hackney Construction Hackney Construction Jump to: navigation, search Name Hackney Construction Address 309 Farrens Creek Lane/PO Box 13 Place Grangeville, Idaho Zip 83530 Sector Solar Product Green Building, renewable energy Year founded 1991 Number of employees 1-10 Phone number 208-983-3109 Website http://DigitalProductsAndRenew Coordinates 45.926552°, -116.1223654° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.926552,"lon":-116.1223654,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

109

Wisconsin No 2 Diesel Off-Highway Construction (Thousand Gallons)  

U.S. Energy Information Administration (EIA)

Wisconsin No 2 Diesel Off-Highway Construction (Thousand Gallons) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1980's: 16,323: 12,292 ...

110

New Mexico Natural Gas Number of Residential Consumers - Transported...  

U.S. Energy Information Administration (EIA) Indexed Site

Transported (Number of Elements) New Mexico Natural Gas Number of Residential Consumers - Transported (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

111

New Mexico Natural Gas Number of Commercial Consumers - Transported...  

U.S. Energy Information Administration (EIA) Indexed Site

Transported (Number of Elements) New Mexico Natural Gas Number of Commercial Consumers - Transported (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

112

New Mexico Natural Gas Number of Industrial Consumers - Transported...  

U.S. Energy Information Administration (EIA) Indexed Site

Transported (Number of Elements) New Mexico Natural Gas Number of Industrial Consumers - Transported (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

113

Environmental Assessment for the Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Environmental Assessment Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan at the Thomas Jefferson National Accelerator Facility Newport News, Virginia January 2007 U. S. Department of Energy Thomas Jefferson Site Office Newport News, VA DOE/EA-1534 January 2007 C:\TRANSFER\JANUARY 26 Final EA-1534-012607 (2).doc i TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... 1 1.0 INTRODUCTION ...........................................................................................11 1.1 PREVIOUS ACTIONS....................................................................................11 1.2 SCOPE OF THIS PROPOSED ACTION .......................................................11

114

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power 2010 Program: Combined Construction and Operating Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

115

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power 2010 Program: Combined Construction and Operating Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

116

Tennessee Natural Gas Number of Gas and Gas Condensate Wells...  

U.S. Energy Information Administration (EIA) Indexed Site

Gas and Gas Condensate Wells (Number of Elements) Tennessee Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

117

Virginia Natural Gas Number of Gas and Gas Condensate Wells ...  

Gasoline and Diesel Fuel Update (EIA)

Gas and Gas Condensate Wells (Number of Elements) Virginia Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

118

Arkansas Natural Gas Number of Gas and Gas Condensate Wells ...  

Gasoline and Diesel Fuel Update (EIA)

Gas and Gas Condensate Wells (Number of Elements) Arkansas Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

119

Oklahoma Natural Gas Number of Gas and Gas Condensate Wells ...  

Gasoline and Diesel Fuel Update (EIA)

Gas and Gas Condensate Wells (Number of Elements) Oklahoma Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

120

Louisiana Natural Gas Number of Gas and Gas Condensate Wells...  

U.S. Energy Information Administration (EIA) Indexed Site

Gas and Gas Condensate Wells (Number of Elements) Louisiana Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Maryland Natural Gas Number of Gas and Gas Condensate Wells ...  

Annual Energy Outlook 2012 (EIA)

Gas and Gas Condensate Wells (Number of Elements) Maryland Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

122

Kentucky Natural Gas Number of Gas and Gas Condensate Wells ...  

U.S. Energy Information Administration (EIA) Indexed Site

Gas and Gas Condensate Wells (Number of Elements) Kentucky Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

123

Colorado Natural Gas Number of Gas and Gas Condensate Wells ...  

Gasoline and Diesel Fuel Update (EIA)

Gas and Gas Condensate Wells (Number of Elements) Colorado Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

124

Michigan Natural Gas Number of Gas and Gas Condensate Wells ...  

Annual Energy Outlook 2012 (EIA)

Gas and Gas Condensate Wells (Number of Elements) Michigan Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

125

Construction proprietary  

E-Print Network (OSTI)

2. Construction a. The composite mirrors The mirror was made of a graphite #12;ber backing, coated An aerogel radiator can in principle pro- vide hadron separation throughout the full momentum range. However proton aerogel gas GeV mrad 0 50 100 150 200 250 2 4 6 8 10 12 14 track parameters Direct Ray Tracing

126

Small business success story: Lindblad Construction | Argonne National  

NLE Websites -- All DOE Office Websites (Extended Search)

Lindblad is the contractor for the laboratory's Rapid Response Program, which allows for construction activities valued at $50,000 and under to be performed on an accelerated schedule. The contract is for a three-year period for an estimated total of $3 million. Lindblad is the contractor for the laboratory's Rapid Response Program, which allows for construction activities valued at $50,000 and under to be performed on an accelerated schedule. The contract is for a three-year period for an estimated total of $3 million. Lindblad is the contractor for the laboratory's Rapid Response Program, which allows for construction activities valued at $50,000 and under to be performed on an accelerated schedule. The contract is for a three-year period for an estimated total of $3 million. Small business success story: Lindblad Construction March 27, 2013 Tweet EmailPrint Based in Joliet, Ill., Lindblad Construction has been performing construction services in the Chicagoland area for more than 60 years. Over the last five years, Lindblad has secured a number of sub-contracts

127

Case Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Name of Petitioner: Name of Petitioner: Date of Filing: Case Number: Department of Energy Washington, DC 20585 JUL 2 2 2009 DEPARTMENT OF ENERGY OFFICE OF HEARINGS AND APPEALS Appeal Dean P. Dennis March 2, 2009 TBA-0072 Dean D. Dennis filed a complaint of retaliation under the Department of Energy (DOE) Contractor Employee Protection Program, 10 C.F.R. Part 708. Mr. Dennis alleged that he engaged in protected activity and that his employer, National Security Technologies, LLC (NSTec ), subsequently terminated him. An Office of Hearings and Appeals (OHA) Hearing Officer denied relief in Dean P. Dennis, Case No. TBH-0072, 1 and Mr. Dennis filed the instant appeal. As discussed below, the appeal is denied. I. Background The DOE established its Contractor Employee Protection Program to "safeguard public

128

JOB NUMBER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . . . . . . . . .: LEAVE BLANK (NARA use only) JOB NUMBER N/-&*W- 9d - 3 DATE RECEIVED " -1s - 9 J - NOTIFICATION TOAGENCY , In accordance with the provisions of 44 U.S.C. 3303a the disposition request. including amendments, is ap roved except , . l for items that may be marke,, ,"dis osition not approved" or "withdrawn in c o i m n 10. 4. NAME OF PERSON WITH WHOM TO CONFER 5 TELEPHONE Jannie Kindred (202) 5&-333 5 - 2 -96 6 AGENCYCERTIFICATION -. ~ - I hereby certify that I am authorized to act for this agency in matters pertaining to the disposition of its records and that the records roposed for disposal are not now needed for the business of this agency or wiRnot be needed after t G t r & s s d ; and that written concurrence from

129

KPA Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supports CMM-SW Level 3 Supports CMM-SW Level 3 Mapping of the DOE Information Systems Engineering Methodology to the Software Engineering Institute (SEI) Software Capability Maturity Model (CMM-SW) level 3. Date: September 2002 Page 1 KPA Number KPA Activity SEM Section SEM Work Product SQSE Web site http://cio.doe.gov/sqse ORGANIZATION PROCESS FOCUS OPF-1 The software process is assessed periodically, and action plans are developed to address the assessment findings. Chapter 1 * Organizational Process Management * Process Improvement Action Plan * Methodologies ! DOE Methodologies ! SEM OPF-2 The organization develops and maintains a plan for its software process development and improvement activities. Chapter 1 * Organizational Process Management * Process Improvement

130

Pennsylvania Natural Gas Number of Gas and Gas Condensate Wells...  

Gasoline and Diesel Fuel Update (EIA)

Gas and Gas Condensate Wells (Number of Elements) Pennsylvania Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

131

New Mexico Natural Gas Number of Underground Storage Acquifers...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquifers Capacity (Number of Elements) New Mexico Natural Gas Number of Underground Storage Acquifers Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

132

SUN (re)construction | Open Energy Information  

Open Energy Info (EERE)

SUN (re)construction SUN (re)construction Jump to: navigation, search Logo: SUN (re)construction Name SUN (re)construction Address 1351 Harker Avenue Place Palo Alto, California Zip 94301 Sector Efficiency Product Zero-net and grid-neutral buildings Year founded 2009 Number of employees 1-10 Phone number 805.679.3616 Website http://www.sunreconstruction.c Coordinates 37.446933°, -122.141049° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.446933,"lon":-122.141049,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

133

Finite Neutrosophic Complex Numbers  

E-Print Network (OSTI)

In this book for the first time the authors introduce the notion of real neutrosophic complex numbers. Further the new notion of finite complex modulo integers is defined. For every $C(Z_n)$ the complex modulo integer $i_F$ is such that $2F_i = n - 1$. Several algebraic structures on $C(Z_n)$ are introduced and studied. Further the notion of complex neutrosophic modulo integers is introduced. Vector spaces and linear algebras are constructed using these neutrosophic complex modulo integers.

W. B. Vasantha Kandasamy; Florentin Smarandache

2011-11-01T23:59:59.000Z

134

PUMP CONSTRUCTION  

DOE Patents (OSTI)

A pump which utilizes the fluid being pumped through it as its lubricating fluid is described. This is achieved by means of an improved bearing construction in a pump of the enclosed or canned rotor type. At the outlet end of the pump, adjacent to an impeller mechanism, there is a bypass which conveys some of the pumped fluid to a chamber at the inlet end of the pump. After this chamber becomes full, the pumped fluid passes through fixed orifices in the top of the chamber and exerts a thrust on the inlet end of the pump rotor. Lubrication of the rotor shaft is accomplished by passing the pumped fluid through a bypass at the outlet end of the rotor shaft. This bypass conveys Pumped fluid to a cooling means and then to grooves on the surface of the rotor shait, thus lubricating the shaft.

Strickland, G.; Horn, F.L.; White, H.T.

1960-09-27T23:59:59.000Z

135

New Mexico Natural Gas Number of Underground Storage Depleted...  

U.S. Energy Information Administration (EIA) Indexed Site

Depleted Fields Capacity (Number of Elements) New Mexico Natural Gas Number of Underground Storage Depleted Fields Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3...

136

Glossary Term - Atomic Number  

NLE Websites -- All DOE Office Websites (Extended Search)

Particle Previous Term (Alpha Particle) Glossary Main Index Next Term (Avogadro's Number) Avogadro's Number Atomic Number Silver's atomic number is 47 The atomic number is equal to...

137

California Natural Gas Number of Residential Consumers (Number of Elements)  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Consumers (Number of Elements) Residential Consumers (Number of Elements) California Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1980's 7,626 7,904,858 8,113,034 8,313,776 1990's 8,497,848 8,634,774 8,680,613 8,726,187 8,790,733 8,865,541 8,969,308 9,060,473 9,181,928 9,331,206 2000's 9,370,797 9,603,122 9,726,642 9,803,311 9,957,412 10,124,433 10,329,224 10,439,220 10,515,162 10,510,950 2010's 10,542,584 10,625,190 10,681,916 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Number of Natural Gas Residential

138

Construction Safety Forecast for ITER  

SciTech Connect

The International Thermonuclear Experimental Reactor (ITER) project is poised to begin its construction activity. This paper gives an estimate of construction safety as if the experiment was being built in the United States. This estimate of construction injuries and potential fatalities serves as a useful forecast of what can be expected for construction of such a major facility in any country. These data should be considered by the ITER International Team as it plans for safety during the construction phase. Based on average U.S. construction rates, ITER may expect a lost workday case rate of < 4.0 and a fatality count of 0.5 to 0.9 persons per year.

cadwallader, lee charles

2006-11-01T23:59:59.000Z

139

Utility Residential New Construction Programs: Going Beyond the...  

NLE Websites -- All DOE Office Websites (Extended Search)

Utility Residential New Construction Programs: Going Beyond the Code Title Utility Residential New Construction Programs: Going Beyond the Code Publication Type Report Year of...

140

Montana Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Montana Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Utah Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Utah Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

142

Virginia Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Virginia Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

143

Kansas Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Kansas Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

144

Alabama Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Alabama Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

145

Michigan Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Michigan Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

146

Maryland Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Maryland Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

147

Arkansas Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Arkansas Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

148

Iowa Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Iowa Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

149

Colorado Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Colorado Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

150

Illinois Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Illinois Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

151

Nebraska Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Nebraska Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

152

Texas Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Texas Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

153

Ohio Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Ohio Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

154

Missouri Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Missouri Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

155

Oklahoma Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Oklahoma Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

156

Indiana Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Indiana Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

157

Wyoming Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Wyoming Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

158

Oregon Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Oregon Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

159

Kentucky Natural Gas Count of Underground Storage Capacity (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Count of Underground Storage Capacity (Number of Elements) Kentucky Natural Gas Count of Underground Storage Capacity (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

160

U.S. Natural Gas Number of Gas and Gas Condensate Wells ...  

U.S. Energy Information Administration (EIA)

U.S. Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 ...

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Glossary Term - Avogadro's Number  

NLE Websites -- All DOE Office Websites (Extended Search)

Atomic Number Previous Term (Atomic Number) Glossary Main Index Next Term (Beta Decay) Beta Decay Avogadro's Number Avogadro's number is the number of particles in one mole of a...

162

New York Natural Gas Number of Gas and Gas Condensate Wells ...  

U.S. Energy Information Administration (EIA) Indexed Site

Gas and Gas Condensate Wells (Number of Elements) New York Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

163

DOE/ID-Number  

NLE Websites -- All DOE Office Websites (Extended Search)

... 29 Modification of ACRR and Construction of New Hot Cell- ...29 Routine Maintenance and Operations at ACRR...

164

Request for Proposals Number RHB-3-23115  

NLE Websites -- All DOE Office Websites (Extended Search)

9 National Renewable Energy Laboratory Managed and Operated by the Alliance for Sustainable Energy, LLC Request for Proposals Number RHB-3-23115 "Construction Project Management...

165

North Dakota Natural Gas Number of Gas and Gas Condensate Wells...  

Annual Energy Outlook 2012 (EIA)

Gas and Gas Condensate Wells (Number of Elements) North Dakota Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

166

West Virginia Natural Gas Number of Gas and Gas Condensate Wells...  

Gasoline and Diesel Fuel Update (EIA)

Gas and Gas Condensate Wells (Number of Elements) West Virginia Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

167

New Mexico Natural Gas Number of Gas and Gas Condensate Wells...  

U.S. Energy Information Administration (EIA) Indexed Site

Gas and Gas Condensate Wells (Number of Elements) New Mexico Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

168

RL-721 Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 NEPA REVIEW SCREENING FORM DOE/CX-00075 I. Project Title: Project 1-718, Electrical Utili ties Transformer Management Support Facility II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): The proposed action includes design, procurement, and construction of a pre-engineered metal building for transformer management; including inspections, routine maintenance, testing, refurbishing, and disposition of excess transformers. The building will be constructed in the previously disturbed, gravel-covered electrical utilities lay-down yard west of the 2101-M Building in 200 East Area of the Hanford Site. The building footprint

169

Number of Gas and Gas Condensate Wells  

Annual Energy Outlook 2012 (EIA)

5 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ... 152 170 165 195 224 Production (million cubic feet)...

170

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

9 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ... 280 300 225 240 251 Production (million cubic feet)...

171

Gaussian random number generators  

Science Conference Proceedings (OSTI)

Rapid generation of high quality Gaussian random numbers is a key capability for simulations across a wide range of disciplines. Advances in computing have brought the power to conduct simulations with very large numbers of random numbers and with it, ... Keywords: Gaussian, Random numbers, normal, simulation

David B. Thomas; Wayne Luk; Philip H.W. Leong; John D. Villasenor

2007-11-01T23:59:59.000Z

172

Sustainable Steel Construction  

Science Conference Proceedings (OSTI)

Jul 3, 2008... House Gases, and Climate Change, Educational Resources. Spacer ... on the construction process—namely speed, prefabrication, safety, ...

173

Construction and Building  

Science Conference Proceedings (OSTI)

... in building sector energy consumption by improving ... housing construction: improving energy efficiency and ... Reinforced Soil Bridge Pier Load Test ...

2000-03-07T23:59:59.000Z

174

French landmark decree authorizes ITER construction | Princeton...  

NLE Websites -- All DOE Office Websites (Extended Search)

ITER construction By John Greenwald November 20, 2012 Tweet Widget Facebook Like Google Plus One The French government has capped more than two years of review by issuing a...

175

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

funded the construction of an URL at a depth of 420 m in the Climax Stock granite at the NTS. Testing involved emplacement of 11 CSNF canisters and 6 simulated canisters into...

176

UCGE Reports Number 20097  

E-Print Network (OSTI)

, the three construction engineering streams - Traffic and Roads, Railway Engineering and Architecture the Ã?hrling Pricewaterhouse Coopers Innovation prize of SEK 150.000 for their discovery of piezoelectric

Calgary, University of

177

Project Construction | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Construction Project Construction Project Construction October 16, 2013 - 5:14pm Addthis Building Design Project Construction Commisioning Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule. Construction Team

178

Interior Construction Renovations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interior Construction Renovations Interior Construction Renovations Interior Construction Renovations October 16, 2013 - 4:53pm Addthis Renewable Energy Options for Interior Construction Renovations Daylighting Passive Solar Heating Solar Water Heating (SWH) Solar Ventilation Air Preheating When a renovation realigns the interior space in a Federal building, proper design of the new space can take advantage of a number of energy technologies. Primarily, the new interior construction should be developed in conjunction with daylighting design to maximize the use of natural light in the space and minimize glare or other lighting issues that affect performance. Passive solar heating, solar water heating (SWH), solar ventilation air preheating, and energy efficiency technologies can also be considered for interior construction renovations.

179

Coal Fuels Alliance: Design and Construction of Early Lead Mini...  

NLE Websites -- All DOE Office Websites (Extended Search)

Coal Fuels Alliance: Design and Construction of Early Lead Mini Fischer-Tropsch Refinery University of Kentucky Center for Applied Energy Research (CAER) Project Number: NT0005988...

180

Quantum Random Number Generator  

Science Conference Proceedings (OSTI)

... trusted beacon of random numbers. You could conduct secure auctions, or certify randomized audits of data. One of the most ...

2013-08-30T23:59:59.000Z

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Nuclear Power 2010 Program: Combined Construction and Operating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all...

182

Construction | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Construction Construction In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. Learn more about the Better Buildings Neighborhood Program. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. Learn more about the Better Buildings Neighborhood Program. Learn about the energy-efficient construction projects that are saving businesses and communities money while creating jobs.

183

Commercial New Construction  

Energy.gov (U.S. Department of Energy (DOE))

Efficiency Vermont offers support to encourage energy efficient design for new construction. Efficiency Vermont will provide support for new commercial buildings, including technical assistance at...

184

Pipeline Construction Guidelines (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

This division of the Utility Regulatory Commission regulates the construction of any segment of an interstate pipeline on privately owned land in Indiana. The division has provisions for...

185

Construction of Channels (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

Permission is required from the Natural Resources Commission is required for the construction or alteration of artificial channels or improved channels of natural watercourses that connect to any...

186

RL·721 Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Document ID Number: Document ID Number: REV 3 NEPA REVIEW SCREENING FORM DOE/CX-00045 . J.proj(;l~t Titl~: - - - -- - - - - - - - - - - - - - - - - - -- --------- ------_. . _ - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - LIMITED FIREBREAK MAINTENANCE ON THE HANFORD SITE DURING CALENDAR YEAR 2012 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions· e.g., acres displaced/disturbed, excavation length/depth, etc.): The Department of Energy (DOE) proposes to perform firebreak maintenance in selected areas of the Hanford Site during calendar year 2012 with limited use of physical, chemical, and prescribed burning methods. Prescribed burning will be performed by the Hanford Fire Department under approved burn plans and permits; and only in previously disturbed

187

Construction Local engineering.  

E-Print Network (OSTI)

management processes such as cost estimating, accelerated construction, contracting, risk impacts to accurately estimate their useful service life is very important. Information gathered through this process. Constructed Facilities Division tti.tamu.edu #12;Expertise & Equipment ExpErtisE & EquipmEnt Created in 2005

188

VENTILATION NEEDS DURING CONSTRUCTION  

Science Conference Proceedings (OSTI)

The purpose of this analysis is to determine ventilation needs during construction and development of the subsurface repository and develop systems to satisfy those needs. For this analysis, construction is defined as pre-emplacement excavation and development is excavation that takes place simultaneously with emplacement. The three options presented in the ''Overall Development and Emplacement Ventilation Systems'' analysis (Reference 5.5) for development ventilation will be applied to construction ventilation in this analysis as well as adding new and updated ventilation factors to each option for both construction and development. The objective of this analysis is to develop a preferred ventilation system to support License Application Design. The scope of this analysis includes: (1) Description of ventilation conditions; (2) Ventilation factors (fire hazards, dust control, construction logistics, and monitoring and control systems); (3) Local ventilation alternatives; (4) Global ventilation options; and (5) Evaluation of options.

C.R. Gorrell

1998-07-23T23:59:59.000Z

189

Constructability -- from Qinshan to the ACR  

Science Conference Proceedings (OSTI)

Atomic Energy of Canada Limited (AECL) has recognized the importance of constructability for many years, and it is applying its principals to CANDU projects with increasing success. The CANDU 6 Nuclear Power Plant has been constructed eleven times in the last 25 years. However, the last two units completed on the Qinshan project in China have employed some very innovative construction methods that have not been used on the previous units. In order to make nuclear power generation more competitive, shorter construction schedules and reduced project cost and risks are essential objectives. The application of constructability principles is a major contributor to achieving these objectives. The success of Qinshan has increased the confidence in the new construction methods, which are being implemented on the ACR (Advanced CANDU Reactor) successfully. An ACR construction strategy that utilizes advanced construction techniques has been developed by AECL. The strategy includes paralleling of activities by using extensive modularization and the vertical installation of equipment and modules into the reactor building using a VHL (Very Heavy Lift) crane. This strategy allows short schedules to be met with a minimum risk to the project.

Elgohary, Medhat; Fairclough, Neville; Ricciuti, Rick

2003-09-01T23:59:59.000Z

190

Feasibility, benefits and challenges of modular construction in high rise development in the United States : a developer's perspective  

E-Print Network (OSTI)

Modular construction has long been utilized in the construction of residential and many other commercial product types as a means for potentially quicker construction delivery times. Over the past 5 years this construction ...

Velamati, Sri

2012-01-01T23:59:59.000Z

191

Texas Natural Gas Number of Industrial Consumers (Number of Elements...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Texas Natural Gas Number of Industrial Consumers (Number of Elements) Texas Natural Gas Number of Industrial Consumers (Number of...

192

Chapter 8: Constructing the Building  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: : Constructing the Building Developing a Construction Plan Writing Effective Construction Documents Safeguarding Design Goals During Construction Protecting the Site Low-Impact Construction Processes Protecting Indoor Air Quality Managing Construction Waste LANL | Chapter 8 Constructing the Building Developing a Construction Plan A high-performance design is a great achievement, but it doesn't mean much if the building isn't then built as intended. Getting from design to a completed project happens in two stages: 1) development of construction documents and 2) actual construction. To successfully implement a sustainable design, the construction docu- ments must accurately convey the specifics that deter- mine building performance, and they have to set up

193

Survey of worldwide legislation on the control of construction noise  

Science Conference Proceedings (OSTI)

The sustained economic growth in many countries of the world in the past few years has led to significant increases in the construction activities for building new homes

2000-01-01T23:59:59.000Z

194

GRR/Section 6 - Construction Permits Overview | Open Energy Information  

Open Energy Info (EERE)

6 - Construction Permits Overview 6 - Construction Permits Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6 - Construction Permits Overview 06 - ConstructionPermitsOverview.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 06 - ConstructionPermitsOverview.pdf 06 - ConstructionPermitsOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Constructing a geothermal power plant requires numerous permits from Federal, state, and local governments, related to transporting construction materials, encroaching upon Federal and state right-of-ways, demolishing existing structures and building new structures.

195

Title Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

Yearly Review Meeting Project DE-FE0002128 Analysis of microbial activity under a supercritical CO 2 atmosphere Massachusetts Institute of Technology Prof. Janelle Thompson,...

196

EPRI Zed-Meter® Construction Guide  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) developed the Zed-Meter to effectively evaluate transmission line structure grounding. The Zed-Meter has a number of advantages, including faster implementation, provision of an indication of impedance rather than resistance, and shield wires that do not need to be disconnected. The Zed-Meter is constructed from a number of off-the-shelf components together with software. This report outlines how a Zed-Meter can be constructed by a utility and how to install t...

2011-12-22T23:59:59.000Z

197

Number | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Number More Documents & Publications Analysis of Open Office of Inspector General Recommendations, OAS-L-08-07 Policy and International Affairs (WFP) Open Government Plan 2.0...

198

Expected Frobenius numbers  

E-Print Network (OSTI)

We show that for large instances the order of magnitude of the expected Frobenius number is (up to a constant depending only on the dimension) given by its lower bound.

Aliev, Iskander; Hinrichs, Aicke

2009-01-01T23:59:59.000Z

199

Spider Web Construction  

NLE Websites -- All DOE Office Websites (Extended Search)

Spider Web Construction Name: Stephanie Location: NA Country: NA Date: NA Question: Near our home on Lake Ontario, we often find spider websm that have a horizontal line at the...

200

Passive solar construction handbook  

DOE Green Energy (OSTI)

Many of the basic elements of passive solar design are reviewed. The unique design constraints presented in passive homes are introduced and many of the salient issues influencing design decisions are described briefly. Passive solar construction is described for each passive system type: direct gain, thermal storage wall, attached sunspace, thermal storage roof, and convective loop. For each system type, important design and construction issues are discussed and case studies illustrating designed and built examples of the system type are presented. Construction details are given and construction and thermal performance information is given for the materials used in collector components, storage components, and control components. Included are glazing materials, framing systems, caulking and sealants, concrete masonry, concrete, brick, shading, reflectors, and insulators. The Load Collector Ratio method for estimating passive system performance is appended, and other analysis methods are briefly summarized. (LEW)

Levy, E.; Evans, D.; Gardstein, C.

1981-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Construction Readiness RM  

Energy.gov (U.S. Department of Energy (DOE))

The authorization to proceed with construction of a new facility is given at the CD-3 phase of the project management cycle, after completion of the final design. Between CD-3 and CD-4 stages of...

202

Photon Sciences | Construction Cameras  

NLE Websites -- All DOE Office Websites (Extended Search)

NSLS-II Construction Cameras You may click either the links or the camera icons shown below to access each webcam. Note: It may take 5-20 seconds to load the webcam console. Live...

203

Automatic thesaurus construction  

Science Conference Proceedings (OSTI)

In this paper we introduce a novel method of automating thesauri using syntactically constrained distributional similarity. With respect to syntactically conditioned cooccurrences, most popular approaches to automatic thesaurus construction simply ignore ... Keywords: distribution, similarity, syntactic dependency

Dongqiang Yang; David M. Powers

2008-01-01T23:59:59.000Z

204

Buildings Energy Data Book: 1.3 Value of Construction and Research  

Buildings Energy Data Book (EERE)

8 8 Number of Construction Employees and Total Employees for Select Building Envolope Industries (Thousand Employees) Poured Concrete Foundation and Structure Contractors (NAICS 238110) -Total Employment -Construction/Extraction Occupations -Construction/Extraction % of Total Masonry Contractors (NAICS 238140) -Total Employment -Construction/Extraction Occupations -Construction/Extraction % of Total Roofing Contractors (NAICS 238160) -Total Employment -Construction/Extraction Occupations -Construction/Extraction % of Total Drywall and Insulation Contractors (NAICS 238310) -Total Employment -Construction/Extraction Occupations -Construction/Extraction % of Total Painting and Wall Covering Contractors (NAICS 238320) -Total Employment -Construction/Extraction Occupations

205

A preconditioned method for rotating flows at arbitrary mach number  

Science Conference Proceedings (OSTI)

An improved preconditioning is proposed for viscous flow computations in rotating and nonrotating frames at arbitrary Mach numbers. The key to the current method is the use of both free stream Mach number and rotating Mach number to construct a preconditioning ...

Chunhua Sheng

2011-01-01T23:59:59.000Z

206

Number of Gas and Gas Condensate Wells  

Annual Energy Outlook 2012 (EIA)

3 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ... 22,442 22,117 23,554 18,774 16,718 Production...

207

Number of Gas and Gas Condensate Wells  

Annual Energy Outlook 2012 (EIA)

2004 1 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year... 341,678 373,304 387,772 393,327 405,048 Production...

208

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

1 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ... 1,169 1,244 1,232 1,249 1,272 Production (million...

209

Session 1: Fatal Construction Injuries Guiding Construction Injury Research: Data Coupled with Industry  

E-Print Network (OSTI)

of examining current construction injury research, identifying research gaps, and developing a strategic research plan. Through existing injury surveillance data systems, much is known about the leading causes of fatal (falls, motor vehicles, machines, and electrocutions) and nonfatal injury (overexertion, falls, and struck by objects) in the construction industry; however, little research has focused on identifying injury problems for specific subsectors of the construction industry. Research that is focused on specific injury problems and specific types of construction work (e.g., falls during truss installation) may lead more directly to identification of effective interventions than research on general injury categories in the construction industry as a whole (e.g., falls in construction). Three high-risk construction industry sectors (highway and street construction, residential building construction, and roofing and truss installation) were selected based on a review of fatal and nonfatal injury data, the number of workers at risk, current trends in the construction industry, OSHA’s regulatory agenda, an external

Casini V; Furrow K; Hause M; Linn H; Washenitz F

1997-01-01T23:59:59.000Z

210

Report number codes  

SciTech Connect

This publication lists all report number codes processed by the Office of Scientific and Technical Information. The report codes are substantially based on the American National Standards Institute, Standard Technical Report Number (STRN)-Format and Creation Z39.23-1983. The Standard Technical Report Number (STRN) provides one of the primary methods of identifying a specific technical report. The STRN consists of two parts: The report code and the sequential number. The report code identifies the issuing organization, a specific program, or a type of document. The sequential number, which is assigned in sequence by each report issuing entity, is not included in this publication. Part I of this compilation is alphabetized by report codes followed by issuing installations. Part II lists the issuing organization followed by the assigned report code(s). In both Parts I and II, the names of issuing organizations appear for the most part in the form used at the time the reports were issued. However, for some of the more prolific installations which have had name changes, all entries have been merged under the current name.

Nelson, R.N. (ed.)

1985-05-01T23:59:59.000Z

211

Oregon Natural Gas Number of Residential Consumers - Sales (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 456,960 477,796 502,000 2000's 523,952 542,799 563,744 625,398 595,495 626,685 647,635...

212

Delaware Natural Gas Number of Industrial Consumers (Number of...  

Gasoline and Diesel Fuel Update (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1980's 241 233 235 1990's 240 243 248 249 252 253 250 265 257 264 2000's 297 316 182 184 186 179...

213

Illinois Natural Gas Number of Commercial Consumers (Number of...  

Gasoline and Diesel Fuel Update (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1980's 241,367 278,473 252,791 1990's 257,851 261,107 263,988 268,104 262,308 264,756 265,007...

214

Number | Open Energy Information  

Open Energy Info (EERE)

Number Number Jump to: navigation, search Properties of type "Number" Showing 200 properties using this type. (previous 200) (next 200) A Property:AvgAnnlGrossOpCpcty Property:AvgTempGeoFluidIntoPlant Property:AvgWellDepth B Property:Building/FloorAreaChurchesChapels Property:Building/FloorAreaGroceryShops Property:Building/FloorAreaHealthServices24hr Property:Building/FloorAreaHealthServicesDaytime Property:Building/FloorAreaHeatedGarages Property:Building/FloorAreaHotels Property:Building/FloorAreaMiscellaneous Property:Building/FloorAreaOffices Property:Building/FloorAreaOtherRetail Property:Building/FloorAreaResidential Property:Building/FloorAreaRestaurants Property:Building/FloorAreaSchoolsChildDayCare Property:Building/FloorAreaShops Property:Building/FloorAreaSportCenters

215

Energy Efficient Residential Construction Tax Credit (Personal) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Personal) Personal) Energy Efficient Residential Construction Tax Credit (Personal) < Back Eligibility Construction Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Commercial Heating & Cooling Cooling Construction Design & Remodeling Windows, Doors, & Skylights Ventilation Heating Heat Pumps Insulation Maximum Rebate 4,000 Program Info Start Date 11/01/2005 State Oklahoma Program Type Personal Tax Credit Rebate Amount Amount of eligible expenditures Provider Oklahoma Department of Commerce '''''Note: After a 2 year moratorium on all state tax credits, this credit may be claimed for tax year 2012 and subsequent tax years, for eligible expenditures on or after July 1, 2012.''''' Oklahoma allows a contractor who is the primary builder of an energy

216

Title Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

Enrolled in Courses with Carbon Sequestration Content 1) GEOL 275 Introductory Geochemistry * 103 students for past two years (43 in 2010, 60 in 2011) 2) GEOL 372 Spring Field...

217

DOE/ID-Number  

NLE Websites -- All DOE Office Websites (Extended Search)

fuel-use airports. Figure 1-1 shows Airport "A" eGSE payback results in years for fossil fuel escalation rates from 0 to 20% per annum. In this case, the model was run for a...

218

Recovery Act Supports Construction of Site's Largest Groundwater Treatment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supports Construction of Site's Largest Groundwater Supports Construction of Site's Largest Groundwater Treatment Facility Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility Construction of the largest groundwater treatment facility at the Hanford Site – a major American Recovery and Reinvestment Act project – is on schedule and more than 70 percent complete. Recovery Act workers with DOE contractor CH2M HILL Plateau Remediation Company are on pace to finish construction of the 200 West Groundwater Treatment Facility this year. Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility More Documents & Publications Hanford Treats Record Amount of Groundwater Recovery Act Invests in Cleanup, Preservation of Hanford Site Locomotives,

219

Using Fractional Numbers of . . .  

E-Print Network (OSTI)

One of the design parameters in closed queueing networks is Np, the number of customers of class p. It has been assumed that Np must be an integer. However, integer choices will usually not achieve the target throughput for each class simultaneously. We use Mean Value Analysis with the Schweitzer-Bard approximation and nonlinear programming to determine the value of Np needed to achieve the production targets exactly, although the values of Np may be fractional. We interpret these values to represent the average number of customers of each class in the network. We implement a control rule to achieve these averages and verify our approach through simulation.

Rajan Suri; Rahul Shinde; Mary Vernon

2005-01-01T23:59:59.000Z

220

Control Measure Title Reference Number *  

E-Print Network (OSTI)

exhaustive search for emissions reductions to use in meeting federal Clean Air Act requirements for this 2008 PM2.5 Plan. Chapter 6 details the District’s process for developing control measures for reducing emissions of primary PM2.5 and PM2.5 precursors. This Appendix presents the product of this process: a master list of all candidate control measure ideas identified and evaluated for this plan. After assembling Appendix I, the District then screened the candidate measures into several categories: high priority measures to be implemented in the years immediately following plan adoption; measures that might be implemented in future years to allow for expected technology development; and those measures that require further study to identify when they could be implemented and what reductions they could achieve. Candidate control measure descriptions in Appendix I have the following major components:! Title and Number

unknown authors

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

CHEMICAL SAFETY Emergency Numbers  

E-Print Network (OSTI)

- 1 - CHEMICAL SAFETY MANUAL 2010 #12;- 2 - Emergency Numbers UNBC Prince George Campus Security Prince George Campus Chemstores 6472 Chemical Safety 6472 Radiation Safety 5530 Biological Safety 5530 use, storage, handling, waste and emergency management of chemicals on the University of Northern

Bolch, Tobias

222

Disjunctive Rado numbers  

Science Conference Proceedings (OSTI)

If L1 and L2 are linear equations, then the disjunctive Rado number of the set {L1, L2} is the least integer n, provided that it exists, such that for every 2-coloring of ... Keywords: Rado, Ramsey, Schur, disjunctive

Brenda Johnson; Daniel Schaal

2005-11-01T23:59:59.000Z

223

A number of organizations,  

E-Print Network (OSTI)

buying power to purchase green power. The city of Chicago has formed an alliance with 47 other local installed solar electric systems on a number of the city's buildings, including the Chicago Center for Green to competition, the city of Chicago and 47 other local government agencies formed the Local Government Power

224

South Dakota Natural Gas Number of Commercial Consumers (Number...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) South Dakota Natural Gas Number of Commercial Consumers (Number of Elements) South Dakota Natural Gas Number of Commercial Consumers...

225

South Dakota Natural Gas Number of Residential Consumers (Number...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) South Dakota Natural Gas Number of Residential Consumers (Number of Elements) South Dakota Natural Gas Number of Residential...

226

South Dakota Natural Gas Number of Industrial Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) South Dakota Natural Gas Number of Industrial Consumers (Number of Elements) South Dakota Natural Gas Number of Industrial Consumers...

227

Maglev guideway cost and construction schedule assessment  

SciTech Connect

A summary of construction cost and scheduling information is presented for four maglev guideway designs on an example route from Baltimore, MD to Newark, NJ. This work results from the National Maglev Initiative (NMI), a government-industry effort from 1989 to 1994. The system design concepts used as a basis for developing cost and construction scheduling information, were submitted by four industry consortia solely for this analysis, and represent their own unpublished designs. The detailed cost and construction schedule analyses cover the main guideway only. A summary estimate was made for stations, power distribution systems, maintenance facilities, and other types of infrastructure. The results of the analyses indicate a number of design aspects which must receive further consideration by future designers. These aspects will affect the practical and economic construction and long-term maintenance of a high-speed maglev guideway.

Plotkin, D.; Kim, S. [Army Construction Engineering Research Lab., Champaign, IL (United States)

1997-05-01T23:59:59.000Z

228

Weatherford Inclined Wellbore Construction  

SciTech Connect

The Rocky Mountain Oilfield Testing Center (RMOTC) has recently completed construction of an inclined wellbore with seven (7) inch, twenty-three (23) pound casing at a total depth of 1296 feet. The inclined wellbore is near vertical to 180 feet with a build angle of approximately 4.5 degrees per hundred feet thereafter. The inclined wellbore was utilized for further proprietary testing after construction and validation. The wellbore is available to other companies requiring a cased hole environment with known deviation out to fifty degrees (50) from vertical. The wellbore may also be used by RMOTC for further deepening into the fractured shales of the Steele and Niobrara formation.

Schulte, R.

2002-08-19T23:59:59.000Z

229

ELECTRICAL DISTRICT NUMBER EIGHT  

NLE Websites -- All DOE Office Websites (Extended Search)

ELECTRICAL DISTRICT NUMBER EIGHT ELECTRICAL DISTRICT NUMBER EIGHT Board of Directors Reply to: Ronald Rayner C. W. Adams James D. Downing, P.E. Chairman Billy Hickman 66768 Hwy 60 Brian Turner Marvin John P.O. Box 99 Vice-Chairman Jason Pierce Salome, AZ 85348 Denton Ross Jerry Rovey Secretary James N. Warkomski ED8@HARCUVARCO.COM John Utz Gary Wood PHONE:(928) 859-3647 Treasurer FAX: (928) 859-3145 Sent via e-mail Mr. Darrick Moe, Regional Manager Western Area Power Administration Desert Southwest Region P. O. Box 6457 Phoenix, AZ 85005-6457 moe@wapa.gov; dswpwrmrk@wapa.gov Re: ED5-Palo Verde Hub Project Dear Mr. Moe, In response to the request for comments issued at the October 6 Parker-Davis Project customer th meeting, and in conjunction with comments previously submitted by the Southwest Public Power

230

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Preventive Action Report Planning Worksheet Document Number: F-018 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-018 Preventive Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 09_0924 Worksheet modified to reflect External Audit recommendation for identification of "Cause for Potential Nonconformance". Minor editing changes. 11_0414 Added Preventive Action Number block to match Q-Pulse

231

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Corrective Action Report Planning Worksheet Document Number: F-017 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-017 Corrective Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 11_0414 Added problem statement to first block. F-017 Corrective Action Report Planning Worksheet 11_0414 3 of 3 Corrective Action Report Planning Worksheet Corrective Action Number: Source: Details/Problem Statement: Raised By: Raised Date: Target Date:

232

Entanglement Distillation Protocols and Number Theory  

E-Print Network (OSTI)

We show that the analysis of entanglement distillation protocols for qudits of arbitrary dimension $D$ benefits from applying basic concepts from number theory, since the set $\\zdn$ associated to Bell diagonal states is a module rather than a vector space. We find that a partition of $\\zdn$ into divisor classes characterizes the invariant properties of mixed Bell diagonal states under local permutations. We construct a very general class of recursion protocols by means of unitary operations implementing these local permutations. We study these distillation protocols depending on whether we use twirling operations in the intermediate steps or not, and we study them both analitically and numerically with Monte Carlo methods. In the absence of twirling operations, we construct extensions of the quantum privacy algorithms valid for secure communications with qudits of any dimension $D$. When $D$ is a prime number, we show that distillation protocols are optimal both qualitatively and quantitatively.

H. Bombin; M. A. Martin-Delgado

2005-03-01T23:59:59.000Z

233

Theorem Proving with the Real Numbers  

E-Print Network (OSTI)

This thesis discusses the use of the real numbers in theorem proving. Typically, theorem provers only support a few `discrete' datatypes such as the natural numbers. However the availability of the real numbers opens up many interesting and important application areas, such as the verification of floating point hardware and hybrid systems. It also allows the formalization of many more branches of classical mathematics, which is particularly relevant for attempts to inject more rigour into computer algebra systems. Our work is conducted in a version of the HOL theorem prover. We describe the rigorous definitional construction of the real numbers, using a new version of Cantor's method, and the formalization of a significant portion of real analysis. We also describe an advanced derived decision procedure for the `Tarski subset' of real algebra as well as some more modest but practically useful tools for automating explicit calculations and routine linear arithmetic reasoning. Finally,...

John Robert Harrison

1996-01-01T23:59:59.000Z

234

Faster Quantum Number Factoring via Circuit Synthesis  

E-Print Network (OSTI)

A major obstacle to implementing Shor's quantum number-factoring algorithm is the large size of modular-exponentiation circuits. We reduce this bottleneck by customizing reversible circuits for modular multiplication to individual runs of Shor's algorithm. Our circuit-synthesis procedure exploits spectral properties of multiplication operators and constructs optimized circuits from the traces of the execution of an appropriate GCD algorithm. Empirically, gate counts are reduced by 4-5 times, and circuit latency is reduced by larger factors.

Igor L. Markov; Mehdi Saeedi

2013-01-15T23:59:59.000Z

235

Segmentally Constructed Prestressed Concrete  

E-Print Network (OSTI)

Segmentally Constructed Prestressed Concrete Hyperboloid Cooling Tower Saml H. Rizkalla Assistant large capacity power plant facilities, the natural draft cooling tower in the fonn of a thin shell concrete natural draft cooling towers is expensive and time-consuming. The cost of the structure

236

Martifer Construction | Open Energy Information  

Open Energy Info (EERE)

Martifer Group that deals in construction services. The division operates in wind farm tower construction, also provides engineering services for solar projects. References...

237

Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction Schedule Current Projects APCF 27-ID and 35-ID LOM438 Pentagon F LOM437 Protocol for halting construction because of vibrations 0614...

238

POLY-FREE CONSTRUCTIONS FOR RIGHT-ANGLED ARTIN GROUPS  

E-Print Network (OSTI)

POLY-FREE CONSTRUCTIONS FOR RIGHT-ANGLED ARTIN GROUPS SUSAN HERMILLER1 AND ZORAN SUNI´C Abstract. We show that every right-angled Artin group A defined by a graph of finite chromatic number is poly-free with poly-free length bounded between the clique number and the chromatic number of . Further

Hermiller, Susan

239

HAPO Plant acquisition and construction budget for FY 1966 and revision of budget for FY 1965  

SciTech Connect

This report provides the Hanford Atomic Products Operation plant acquisition and construction budget for fiscal year 1966 and the revision of budget for fiscal year 1965.

Connell, R.A.

1964-04-28T23:59:59.000Z

240

Construction Readiness RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Readiness Review Module Construction Readiness Review Module March 2010 CD- [This Rev Readiness -0 view Module w s Review (CRR OFFICE O CD-1 was used to dev R). This Review OF ENVIRO Standard R Construc Rev Critical D CD-2 M velop the Revie w Module cont ONMENTA Review Pla ction Rea view Modul Decision (CD C March 2010 ew Plan for Sal tains the lesson Review.] AL MANAG an (SRP) adiness le D) Applicabili D-3 lt Waste Proce ns learned from GEMENT ity CD-4 ssing Facility ( m the SWPF Co Post Ope (SWPF) Const onstruction Re eration truction eadiness Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

EPRI Zed-Meter Construction Guide  

Science Conference Proceedings (OSTI)

EPRI developed the Zed-Meter to effectively evaluate transmission line structure grounding. The Zed-Meter has a number of advantages that include faster implementation, provision of an indication of impedance rather than resistance, and shield wires that do not need to be disconnected. The Zed-Meter is constructed from several off-the-shelf components together with software. This report outlines the way in which a Zed-Meter can be constructed by a utility and how to install the software. This document is...

2010-12-23T23:59:59.000Z

242

KPA Activity Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

supports CMM-SW Level 2 supports CMM-SW Level 2 Mapping of the DOE Systems Engineering Methodology to the Software Engineering Institute (SEI) Software Capability Maturity Model (CMM- SW) level 2. Date: September 2002 Page 1 KPA Activity Number KPA Activity SEM Section SME Work Product SQSE Web Site http://cio.doe.gov/sqse REQUIREMENTS MANAGEMENT RM-1 The software engineering group reviews the allocated requirements before they are incorporated in the software project. Chapter 3.0 * Develop High-Level Project Requirements Chapter 4.0 * Establish Functional Baseline * Project Plan * Requirements Specification Document * Requirements Management awareness * Defining Project Requirements RM-2 The software engineering group uses the allocated requirements as the basis for

243

Neutron capture therapy: Years of experimentation---Years of reflection  

Science Conference Proceedings (OSTI)

This report describes early research on neutron capture therapy over a number of years, beginning in 1950, speaking briefly of patient treatments but dwelling mostly on interpretations of our animal experiments. This work carried out over eighteen years, beginning over forty years ago. Yet, it is only fitting to start by relating how neutron capture therapy became part of Brookhaven's Medical Research Center program.

Farr, L.E.

1991-12-16T23:59:59.000Z

244

Philadelphia Gas Works - Residential and Commercial Construction Incentives  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Gas Works - Residential and Commercial Construction Philadelphia Gas Works - Residential and Commercial Construction Incentives Program (Pennsylvania) Philadelphia Gas Works - Residential and Commercial Construction Incentives Program (Pennsylvania) < Back Eligibility Commercial Industrial Multi-Family Residential Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Maximum Rebate Residential: $750 Commercial: $60,000 Program Info Start Date 9/1/2012 Expiration Date 8/31/2015 State Pennsylvania Program Type Utility Rebate Program Rebate Amount '''Residential''' Residential Construction: $750 '''Commercial/Industrial''' 10% to 20% to 30% above code, $40/MMBtu first-year savings Philadelphia Gas Works (PGW) provides incentives to developers, home

245

Title Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Research 2011 Yearly Review Meeting Project DE-FE0002128 Analysis of microbial activity under a supercritical CO 2 atmosphere Massachusetts Institute of Technology Prof. Janelle Thompson, Department of Civil and Environmental Engineering February 24-26, 2011 Project Participants * Dr. Janelle Thompson, PhD, Assistant Professor, Civil and Environmental Engineering (MIT) * Dr. Hector Hernandez, PhD, Martin Luther King Postdoctoral Fellow (MIT) * Mr. Kyle Peet, doctoral student, Civil and Environmental Engineering, MIT * 2 undergraduates Janelle Hector Kyle 3 Why do microbes matter? CO 2 "trapping" mechanisms -biofilm barriers -mineralization Natural and Engineered Systems Mitchell et al, 2009 dawsonite Biofilm Barriers Biological catalysis of mineral trapping Can we recover life forms that grow in supercritical CO

246

Grantee Total Number of Homes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grantee Grantee Total Number of Homes Weatherized through November 2011 [Recovery Act] Total Number of Homes Weatherized through November 2011 (Calendar Year 2009 - November 2011) [Recovery Act + Annual Program Funding] Alabama 6,704 7,867 1 Alaska 443 2,363 American Samoa 304 410 Arizona 6,354 7,518 Arkansas 5,231 6,949 California 41,649 50,002 Colorado 12,782 19,210 Connecticut 8,940 10,009 2 Delaware** 54 54 District of Columbia 962 1,399 Florida 18,953 20,075 Georgia 13,449 14,739 Guam 574 589 Hawaii 604 1,083 Idaho** 4,470 6,614 Illinois 35,530 44,493 Indiana** 18,768 21,689 Iowa 8,794 10,202 Kansas 6,339 7,638 Kentucky 7,639 10,902 Louisiana 4,698 6,946 Maine 5,130 6,664 Maryland 8,108 9,015 Massachusetts 17,687 21,645 Michigan 29,293 37,137 Minnesota 18,224 22,711 Mississippi 5,937 6,888 Missouri 17,334 20,319 Montana 3,310 6,860 Navajo Nation

247

The amazing number Pi - CECM  

E-Print Network (OSTI)

In constructing the all star hockey team of great mathematicians, there seems to be pretty wide agreement that the front line consists of Archimedes,Newton,.

248

Labor Standards for Construction | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Labor Standards for Construction Labor Standards for Construction Labor Standards for Construction More Documents & Publications Chapter 22 - Labor Standards for Construction Labor...

249

EPA completes construction at 217 sites by September 30, 1993. Fact sheet  

SciTech Connect

Since 1991, when the final cleanup remedy was considered completed at only 61 sites, EPA has made significant progress, doubling and then more than tripling that number in the last 2 years. During Fiscal Year (FY) 1993, final remedy construction was completed at 68 sites, increasing the total to 217. These 217 sites demonstrate the diversity of the nation's hazardous waste sites: the chemical contaminants, geographic locations, and cleanup technologies present unique challenges at each site. Although construction of the final site remedy has been completed at the 217 sites, many of the sites may require long-term operation of the cleanup technology to ensure that the cleanup is effective and protective of human health and the environment. While the completion of construction at 217 sites represents a meaningful accomplishment in finalizing activities at sites, it portrays only a portion of the total work under Superfund to address hazardous sites, conduct site assessments to evaluate the need and type of cleanup required, and construct cleanup remedies.

Not Available

1993-11-01T23:59:59.000Z

250

Rocky Flats Former Construction Workers, Construction Worker Screening  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Former Construction Workers, Construction Worker Rocky Flats Former Construction Workers, Construction Worker Screening Projects Rocky Flats Former Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Rocky Flats Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Local Outreach Office: Dwayne Adkins 7510 W. Mississippi Ave., Suite 230 Lakewood, CO 80226 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica

251

Idaho National Laboratory Former Construction Workers, Construction Worker  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho National Laboratory Former Construction Workers, Construction Idaho National Laboratory Former Construction Workers, Construction Worker Screening Projects Idaho National Laboratory Former Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Idaho National Laboratory (INL) Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: 1-800-866-9663 Local Outreach Office: Dan Obray 456 N. Arthur Avenue Pocatello, ID 83204 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica

252

Waste Isolation Pilot Plant Construction Workers, Construction Worker  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Construction Workers, Construction Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: WIPP Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

253

Pinellas Former Construction Worker, Construction Worker Screening Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pinellas Former Construction Worker, Construction Worker Screening Pinellas Former Construction Worker, Construction Worker Screening Projects Pinellas Former Construction Worker, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Pinellas Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: 1-800-866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

254

Twenty Years of Underground Research at Canada's URL  

Science Conference Proceedings (OSTI)

Construction of Atomic Energy of Canada Limited's (AECL's) Underground Research Laboratory (URL) began in 1982. The URL was designed to address the needs of the Canadian nuclear fuel waste management program. Over the years, a comprehensive program of geologic characterization and underground hydrogeologic, geotechnical and geomechanical projects have been performed, many of which are ongoing. The scientific work at the URL has evolved through a number of different phases to meet the changing needs of Canada's waste management program. The various phases of the URL have included siting, site evaluation, construction and operation. Collaboration with international organizations is encouraged at the URL, with the facility being a centre of excellence in an International Atomic Energy Agency (IAEA) network of underground facilities. One of AECL's major achievements of the past 20 year program has been the preparation and public defense of a ten-volume Environmental Impact Statement (EIS) for a conceptual deep geologic repository. Completion of this dissertation on the characterization, construction and performance modeling of a conceptual repository in the granite rock of the Canadian Shield was largely based on work conducted at the URL. Work conducted over the seven years since public defense of the EIS has been directed towards developing those engineering and performance assessment tools that would be required for implementation of a deep geologic repository. The URL continues to be a very active facility with ongoing experiments and demonstrations performed for a variety of Canadian and international radioactive waste management organizations.

Chandler, N. A.

2003-02-27T23:59:59.000Z

255

TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT  

SciTech Connect

Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

LESKO KF; BERRIOCHOA MV

2010-02-26T23:59:59.000Z

256

TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT  

SciTech Connect

Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

LESKO KF; BERRIOCHOA MV

2010-02-26T23:59:59.000Z

257

Underground Transmission Cable System Construction and Installation Practices Manual  

Science Conference Proceedings (OSTI)

A reliable underground transmission line depends on reliable cable system manufacturing, design, construction, installation, and operation and maintenance. Construction and installation remain the most expensive component to implement. Recent advances in underground transmission have led to more demand for best practices and innovative ways to reduce construction and installation costs in a cable project. The Electric Power Research Institute (EPRI) has funded many projects over the years to improve the ...

2010-12-03T23:59:59.000Z

258

Construction in Navigable Waters (South Carolina) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction in Navigable Waters (South Carolina) Construction in Navigable Waters (South Carolina) Construction in Navigable Waters (South Carolina) < Back Eligibility Agricultural Commercial Construction Industrial Installer/Contractor Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Program Info State South Carolina Program Type Siting and Permitting Provider South Carolina Department of Health and Environmental Control This South Carolina Department of Health and Environmental Control program establishes a number of provisions regarding waters, water resources, and drainage in South Carolina. Navigable streams and rivers are declared to be common highways and "forever free". The obstruction of such waterways

259

SF6432-CN Construction  

NLE Websites -- All DOE Office Websites (Extended Search)

7/31/13 7/31/13 Page 1 of 31 Printed copies of this document are uncontrolled. Retrieve latest version electronically. SANDIA CORPORATION SF 6432-CN (07/2013) Section II STANDARD TERMS AND CONDITIONS FOR FIRM-FIXED PRICE COMMERCIAL CONSTRUCTION CONTRACTS THE FOLLOWING CLAUSES APPLY TO THIS CONTRACT AS INDICATED UNLESS SPECIFICALLY DELETED, OR EXCEPT TO THE EXTENT THEY ARE SPECIFICALLY SUPPLEMENTED OR AMENDED IN WRITING IN THE COVER PAGE OR SECTION I. (CTRL+CLICK ON A LINK BELOW TO ADVANCE DIRECTLY TO THAT SECTION) ACCEPTANCE OF TERMS AND CONDITIONS (Ts&Cs) APPLICABLE LAW ASSIGNMENT AUTHORIZED DISTRIBUTORS BANKRUPTCY CANCELLATION OR TERMINATION FOR CONVENIENCE CHANGES COMPLIANCE WITH LAWS DEFINITIONS DIFFERING SITE CONDITIONS DISPUTES

260

Number: 305 Most Dangerous Vehicles ...  

Science Conference Proceedings (OSTI)

... top> Number: 314 Marine Vegetation Description: Commercial harvesting of marine vegetation such as algae, seaweed and ...

2002-12-12T23:59:59.000Z

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Use of Coal Ash in Highway Construction: Michigan Demonstration Project  

Science Conference Proceedings (OSTI)

This report documents the construction and performance testing of a 3000-ft length of fly ash base under a highway shoulder. Following three years of service, the road shoulder shows no signs of premature deterioration. This report should aid utilities seeking to increase ash-use rates in highway-related projects, as well as state highway design engineers responsible for preparing construction specifications.

1991-03-05T23:59:59.000Z

262

Building Energy Software Tools Directory: Construction R-value Calculator  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction R-value Calculator Construction R-value Calculator This online calculator calculates the R-value of a large number of common wall and roof constructions given a specified level of insulation. It uses the isothermal planes method to account for thermal bridging of framing material. Keywords R-value, thermal bridging Validation/Testing N/A Expertise Required Basic understanding of construction details is required. Users Approximately 15,000 web hits per month, mainly from New Zealand. Audience Designers and architects, researchers, officials dealing with building regulations Input The user selects the appropriate wall and roof design details from a number of drop-down boxes and enters the R-value of the installed insulation product. Output The program displays the R-value achieved by the wall or roof construction

263

Toshiba's developments on construction techniques of nuclear power plants  

SciTech Connect

Reliable and economic energy supplies are fundamental requirements of energy policies in Japan. To accomplish these needs, nuclear power plants are being increased in Japan. In recent years, construction cost increases and schedule extensions have affected the capital cost of nuclear energy, compared with fossil power plants, due to lower costs of oil and coal. On the other hand, several severe regulations have been applied to nuclear power plant designs. High-quality and cooperative engineering and harmonized design of equipment and parts are strongly required. Therefore, reduced construction costs and scheduling, as well as higher quality and reliability, are the most important items for nuclear industry. Toshiba has developed new construction techniques, as well as design and engineering tools for control and management, that demonstrate the positive results achieved in the shorter construction period of 1100-MW(electric) nuclear power plants. The normal construction period so far is 64 months, whereas the current construction period is 52 months. (New construction techniques are partially applied). In future years, the construction period will be lowered to 48 months. (New construction techniques are fully applied). A construction period is defined as time from the start of rock inspection to the start of commercial operation.

Hayashi, Y.; Itoh, N.

1987-01-01T23:59:59.000Z

264

Sandia National Laboratory (NM) Former Workers, Construction...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Former Workers, Construction Worker Screening Projects Sandia National Laboratory (NM) Former Workers, Construction Worker Screening Projects...

265

Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong  

SciTech Connect

Highlights: Black-Right-Pointing-Pointer A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. Black-Right-Pointing-Pointer However, the reduction cannot be sustained. Black-Right-Pointing-Pointer Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk [Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong); Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara [Department of Civil and Structural Engineering, Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong)

2013-01-15T23:59:59.000Z

266

CHANGE OF NAME TIAA Annuity Number CREF Annuity Number TIAA Policy Number  

E-Print Network (OSTI)

CHANGE OF NAME TIAA Annuity Number CREF Annuity Number TIAA Policy Number Social Security Number and only use black or dark blue ink. Return this form to: TIAA-CREF P.O. Box 1264 Charlotte, NC 28201 NOTE City State Zip Code For TIAA-CREF USE ONLY Accepted -- Teachers Insurance and Annuity Association

Snider, Barry B.

267

Construction computer-aided engineering  

SciTech Connect

Hitachi Ltd. and Bechtel Power Corporation are presently designing nuclear power plants for Japanese utilities exclusively on three-dimensional computer-aided design and drafting (CADD) systems. To make these three-dimensional CADD models more effective for construction activities, Hitachi and Bechtel are jointly developing a software package that allows construction engineers and planners to effectively empty an area of the three-dimensional CADD model and rebuild it electronically to simulate, animate, and optimize the construction sequence and methodology. The components in the three-dimensional CADD model are placed as they would be for actual construction (i.e., piping spool pieces, skid-mounted systems, piping, and equipment modules, etc.). The construction engineer and planners can then select the components along with appropriate handling equipment and simulate/animate the actual construction sequence. After the construction sequence has been optimized, it is captured on videotape for use in the field. The results of the simulated activities are then passed on to computer program module (CPM) scheduling and work breakdown structure programs for accurate bottom-up construction activity planning and commodity tracking. This entire process can be iterated to an optimum solution before the actual construction begins. Once construction is in progress, the program can compare the actual status and allow resimulations for workarounds.

Hayashi, T.; Yoshinaga, T.; Atkins, D.; Astleford, R.

1987-01-01T23:59:59.000Z

268

The Distribution of Ramsey Numbers  

E-Print Network (OSTI)

We prove that the number of integers in the interval [0,x] that are non-trivial Ramsey numbers r(k,n) (3 order of magnitude (x ln x)**(1/2).

Clark, Lane

2013-01-01T23:59:59.000Z

269

MODULAR CONSTRUCTION SYSTEM EVALUATION  

SciTech Connect

The purpose of this study is to respond to U.S. Department of Energy (DOE) Technical Direction Letter (TDL) 02-003 (Waisley 2001), which directs Bechtel SAIC Company, LLC (BSC) to complete a design study to recommend repository design options to support receipt and/or emplacement of any or all of the following: commercial spent nuclear fuel (CSNF), high-level radioactive waste (HLW), DOE-managed spent nuclear fuel (DSNF) (including naval spent nuclear fuel [SNF]), and immobilized plutonium (if available), as soon as practicable, but no later than 2010. From the possible design options, a recommended approach will be determined for further evaluation to support the preliminary design of the repository. This study integrates the results of the repository Design Evolution Study (Rowe 2002) with supporting studies concerning national transportation options (BSC 2002b) and Nevada transportation options (Gehner 2002). The repository Design Evolution Study documents the processes used to reevaluate the design, construction, operation, and cost of the repository in response to TDL 02-003 (Waisley 2001), and to determine possible repository conceptual design options. The transportation studies evaluate the national and Nevada transportation options that support the repository conceptual design options. An evaluation methodology was established, based on Program-level requirements developed for the study in reference BSC 2001a, to allow the repository and system design options to be evaluated on a consistent basis. The transportation options and the design components were integrated into system design implementation options, which were evaluated using receipt and emplacement scenarios. The scenarios tested the ability of the design concept to adapt to changes in funding, waste receipt rate, and Nevada rail transportation availability. The results of the evaluation (in terms of system throughput, cost, and schedule) were then compared to the Program-level requirements, and recommendations for design alternatives, requirements changes, or further evaluation were developed.

S. Gillespie

2002-08-08T23:59:59.000Z

270

Cedar Falls Utilities - Residential New Construction Program | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cedar Falls Utilities - Residential New Construction Program Cedar Falls Utilities - Residential New Construction Program Cedar Falls Utilities - Residential New Construction Program < Back Eligibility Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Program Info State Iowa Program Type Utility Rebate Program Rebate Amount 25% electric rate discount for 4 years (if home is heated with natural gas) 25% electric rate discount for 2 years (if home is heated with electricity) Provider Cedar Falls Utilities Cedar Falls Utilities offers incentives to residential customers who construct new energy efficient homes. A rate discount of 25% is available to customers who meet the 5 Star Home Program criteria for new home

271

Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NATIONAL ENERGY POLICY NATIONAL ENERGY POLICY STATUS REPORT on Implementation of NEP Recommendations January, 2005 1 NEP RECOMMENDATIONS: STATUS OF IMPLEMENTATION Chapter 1 1. That the President issue an Executive Order to direct all federal agencies to include in any regulatory action that could significantly and adversely affect energy supplies, distribution, or use, a detailed statement of energy effects and alternatives in submissions to the Office of Management and Budget of proposed regulations covered and all notices of proposed regulations published in the Federal Register. STATUS: IMPLEMENTED. In May 2001, President Bush issued Executive Order 13211 requiring federal agencies to include, in any regulatory action that could significantly and

272

Number: 1394 Description: In what ...  

Science Conference Proceedings (OSTI)

... Number: 1752 Description: When was the Oklahoma City bombing? ... name of the plane that dropped the Atomic Bomb on Hiroshima? ...

2003-02-12T23:59:59.000Z

273

Fast Mix Table Construction for Material Discretization  

Science Conference Proceedings (OSTI)

An effective hybrid Monte Carlo--deterministic implementation typically requires the approximation of a continuous geometry description with a discretized piecewise-constant material field. The inherent geometry discretization error can be reduced somewhat by using material mixing, where multiple materials inside a discrete mesh voxel are homogenized. Material mixing requires the construction of a ``mix table,'' which stores the volume fractions in every mixture so that multiple voxels with similar compositions can reference the same mixture. Mix table construction is a potentially expensive serial operation for large problems with many materials and voxels. We formulate an efficient algorithm to construct a sparse mix table in $O(\\text{number of voxels}\\times \\log \\text{number of mixtures})$ time. The new algorithm is implemented in ADVANTG and used to discretize continuous geometries onto a structured Cartesian grid. When applied to an end-of-life MCNP model of the High Flux Isotope Reactor with 270 distinct materials, the new method improves the material mixing time by a factor of 100 compared to a naive mix table implementation.

Johnson, Seth R [ORNL

2013-01-01T23:59:59.000Z

274

Neutron capture therapy: Years of experimentation---Years of reflection  

SciTech Connect

This report describes early research on neutron capture therapy over a number of years, beginning in 1950, speaking briefly of patient treatments but dwelling mostly on interpretations of our animal experiments. This work carried out over eighteen years, beginning over forty years ago. Yet, it is only fitting to start by relating how neutron capture therapy became part of Brookhaven`s Medical Research Center program.

Farr, L.E.

1991-12-16T23:59:59.000Z

275

Data Compression with Prime Numbers  

E-Print Network (OSTI)

A compression algorithm is presented that uses the set of prime numbers. Sequences of numbers are correlated with the prime numbers, and labeled with the integers. The algorithm can be iterated on data sets, generating factors of doubles on the compression.

Gordon Chalmers

2005-11-16T23:59:59.000Z

276

Hanford Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONSTRUCTION CONSTRUCTION WORKES AT HANFORD: A NEEDS ASSESSMENT Submitted by Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Central Washington Building and Construction Trades Council In cooperation with United Brotherhood of Carpenters University of Cincinnati Occupational Health Foundation George Washington University Zenith Administrators, Inc. Duke University July 1, 1997 Table bt Cóütn 1. Introduction and Background a. Specific Aims b. Rationale for Program 2. Need for Establishing Medical Evaluation and Notification a. Medical Surveillance b. History of Site c. Special Issues for Construction Workers 3. Size of Construction Workers' Population (Since 1943) a. Crude Estimate of Population Size b. Population Before 1950 c. Population After 1950

277

Specifying formative constructs in information systems research  

Science Conference Proceedings (OSTI)

While researchers go to great lengths to justify and prove theoretical links between constructs, the relationship between measurement items and constructs is often ignored. By default, the relationship between construct and item is assumed to be reflective, ... Keywords: composite constructs, formative constructs, latent constructs, measurement models, methodology, reflective constructs, statistical conclusion validity, type i and type II errors

Stacie Petter; Detmar Straub; Arun Rai

2007-12-01T23:59:59.000Z

278

Transmission Line Design and Construction  

Science Conference Proceedings (OSTI)

The power industry wants to construct reliable and cost-effective overhead lines. A reliable and cost effective line requires not only that the line and structures meet design criteria for strength, clearances, and electrical considerations, but also that it be designed for safe and easy construction and maintenance. Design and construction practices should therefore go hand in hand. Information among various departments within a utility has to be shared for mutual benefit. Communication is a key ...

2012-12-31T23:59:59.000Z

279

National Construction Safety Team Act  

Science Conference Proceedings (OSTI)

... This briefing will be scheduled at an upcoming meeting of the ... of documents provided to NIST related to the construction and maintenance of the ...

2012-07-26T23:59:59.000Z

280

Construction Work in Progress (Kansas)  

Energy.gov (U.S. Department of Energy (DOE))

This Act allows nuclear power plants to qualify for recovery of Construction Work in Progress (CWIP) and other preconstruction expenditures in rates. Previously, nuclear power plants were excluded...

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Manhattan Project: CP-1 Construction  

Office of Scientific and Technical Information (OSTI)

CP-1 construction, November 24, 1942. Visible are portions of layers 27, 28, and 29. The Goodyear balloon is visible in the background. Events > Difficult Choices, 1942 > More...

282

Notices OMB Control Number: 1850-0803.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

870 Federal Register 870 Federal Register / Vol. 78, No. 140 / Monday, July 22, 2013 / Notices OMB Control Number: 1850-0803. Type of Review: Extension without change of an existing collection of information. Respondents/Affected Public: Individuals or households. Total Estimated Number of Annual Responses: 135,000. Total Estimated Number of Annual Burden Hours: 27,000. Abstract: This is a request for a 3-year renewal of the generic clearance to allow the National Center for Education Statistics (NCES) to continue to develop, test, and improve its survey and assessment instruments and methodologies. The procedures utilized to this effect include but are not limited to experiments with levels of incentives for various types of survey operations, focus groups, cognitive laboratory

283

Table HC5.10 Home Appliances Usage Indicators by Year of ...  

U.S. Energy Information Administration (EIA)

Million U.S. Housing Units 1950 to 1959 1960 to 1969 1970 to 1979 Table HC5.10 Home Appliances Usage Indicators by Year of Construction, 2005 Year of Construction

284

Buildings Energy Data Book: 2.5 Residential Construction and Housing Market  

Buildings Energy Data Book (EERE)

Construction Statistics of New Homes Completed/Placed Year Thousand Units Average SF Thousand Units Average SF 1980 234 1981 229 1982 234 1983 278 1984 288 1985 283 1986 256 1987 239 1988 224 1989 203 1990 195 1991 174 1992 212 1993 243 1994 291 1995 319 1996 338 1997 336 1998 374 1999 338 2000 281 2001 196 2002 174 2003 140 2004 124 2005 123 2006 112 2007 95 2008 81 2009 55 2010 50 Source(s): 496 2,392 155 1,172 701 DOC, 2010 Characteristics of New Housing, 2010, "Median and Average Square Feet of Floor Area in New Single-Family Houses Completed by Location", "Presence of Air-Conditioning in New Single Family Houses", "Number of Multifamily Units Completed by Number of Units Per Building", "Median and Average Square Feet of Floor Area in Units in New Multifamily Buildings Completed", "Placements of New Manufactured Homes by Region and Size of Home, 1980-

285

Publication Distribution To: All Construction Manual holders Publication Title Publication Number  

E-Print Network (OSTI)

Remarks: Starting with this update, we are trying a new system for identifying the revisions made to the manual, by underlining them. We will continue to provide the change bar for ease of identification of the specific revisions while thumbing through the manual. Additional copies may be purchased from:

unknown authors

2003-01-01T23:59:59.000Z

286

An Approach for Measuring Reductions in Construction ...  

Science Conference Proceedings (OSTI)

Page 1. An Approach for Measuring Reductions in Construction Worker Illnesses and Injuries: Baseline Measures of Construction Industry ...

2001-02-09T23:59:59.000Z

287

National Construction Safety Team (NCST) Advisory ...  

Science Conference Proceedings (OSTI)

... Background on the National Construction Safety Team Act NCST Advisory Committee. ... National Construction Safety Teams Annual Reports. ...

2013-09-26T23:59:59.000Z

288

Mallinckrodt Chemical Co., Former Construction Worker Screening...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mallinckrodt Chemical Co., Former Construction Worker Screening Projects Mallinckrodt Chemical Co., Former Construction Worker Screening Projects Project Name: Building Trades...

289

FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) Form provides information on the federal assistance budget for...

290

Sandia National Laboratory (CA) Former Workers, Construction...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Former Workers, Construction Worker Screening Projects Sandia National Laboratory (CA) Former Workers, Construction Worker Screening Projects Project Name: Worker Health...

291

Dynamic virtual credit card numbers  

Science Conference Proceedings (OSTI)

Theft of stored credit card information is an increasing threat to e-commerce.We propose a dynamic virtual credit card number scheme that reduces the damage caused by stolen credit card numbers. A user can use an existing credit card account to generate ... Keywords: credit card theft, e-commerce

Ian Molloy; Jiangtao Li; Ninghui Li

2007-02-01T23:59:59.000Z

292

Property:GRR/SectionNumber | Open Energy Information  

Open Energy Info (EERE)

SectionNumber SectionNumber Jump to: navigation, search Property Name GRR/SectionNumber Property Type Number Description The section number of a section in the Geothermal Regulatory Roadmap. The value of this property is derived automatically by the section template and is used in sorting sections on the GRR Home page. Subproperties This property has the following 2 subproperties: G GRR/Section 6-HI-d - Oversize and/or Overweight Vehicles and Loads Permit GRR/Section 7 - Power Plant Siting/Construction Overview Pages using the property "GRR/SectionNumber" Showing 25 pages using this property. (previous 25) (next 25) G GRR/Section 1 - Land Use Overview + 1 + GRR/Section 1-AK-a - Land Use Considerations + 1 + GRR/Section 1-CA-a - State Land Use Planning + 1 +

293

Construction Spending | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Spending Spending BusinessUSA Data/Tools Apps Challenges Let's Talk BusinessUSA You are here Data.gov » Communities » BusinessUSA » Data Construction Spending Dataset Summary Description Construction Spending provides monthly estimates of the total dollar value of construction work done in the U.S. Construction Spending covers the dollar construction work done each month on new structures or improvements to existing structures for private and public sectors. Data estimates include the cost of labor and materials, cost of architectural and engineering work, overhead costs, interest and taxes paid during construction, and contractor's profits. Tags {construction,spending,value,"put in place",private,residential,nonresidential,public,state,local,federal,lodging,office,commercial,"health care",educational,religious,safety,amusement,recreation,transportation,communication,power,highway,street,sewage,waste,disposal,water,supply,conservation,development,manufacturing,structure,building,single-family,multifamily,housing,new,improvement,existing,sectors,cost," labor",materials,architectural,engineering,overhead,interest,taxes,contractor,profit}

294

TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK  

SciTech Connect

Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

LESO KF; HAMILTON HM; FARNER M; HEATH T

2010-01-14T23:59:59.000Z

295

Passive-solar construction handbook  

DOE Green Energy (OSTI)

Many of the basic elements of passive solar design are reviewed. Passive solar construction is covered according to system type, each system type discussion including a general discussion of the important design and construction issues which apply to the particular system and case studies illustrating designed and built examples of the system type. The three basic types of passive solar systems discussed are direct gain, thermal storage wall, and attached sunspace. Thermal performance and construction information is presented for typical materials used in passive solar collector components, storage components, and control components. Appended are an overview of analysis methods and a technique for estimating performance. (LEW)

Levy, E.; Evans, D.; Gardstein, C.

1981-02-01T23:59:59.000Z

296

Plant construction and community stress  

SciTech Connect

Reports on a study commissioned by EPRI's Energy Analysis and Environment Division to acquire a better understanding of the power plant construction process and the socioeconomic impacts it can bring about. Points out that because of a parallel study the NRC conducted involving nuclear plants, the EPRI study's emphasis was on coal-fired power plants, which represented 9 of the 12 case studies. Finds that the impacts on communities near the case study plants were considerably less than had been forecast. Emphasizes that improper socioeconomic assessment procedures and poor mitigation planning can contribute to costly construction delays and lower construction worker productivity.

Lihach, N.

1982-11-01T23:59:59.000Z

297

Constructing Hydraulic Barriers in Deep Geologic Formations  

Science Conference Proceedings (OSTI)

Many construction methods have been developed to create hydraulic barriers to depths of 30 to 50 meters, but few have been proposed for depths on the order of 500 meters. For these deep hydraulic barriers, most methods are potentially feasible for soil but not for hard rock. In the course of researching methods of isolating large subterranean blocks of oil shale, the authors have developed a wax thermal permeation method for constructing hydraulic barriers in rock to depths of over 500 meters in competent or even fractured rock as well as soil. The technology is similar to freeze wall methods, but produces a permanent barrier; and is potentially applicable in both dry and water saturated formations. Like freeze wall barriers, the wax thermal permeation method utilizes a large number of vertical or horizontal boreholes around the perimeter to be contained. However, instead of cooling the boreholes, they are heated. After heating these boreholes, a specially formulated molten wax based grout is pumped into the boreholes where it seals fractures and also permeates radially outward to form a series of columns of wax-impregnated rock. Rows of overlapping columns can then form a durable hydraulic barrier. These barriers can also be angled above a geologic repository to help prevent influx of water due to atypical rainfall events. Applications of the technique to constructing containment structures around existing shallow waste burial sites and water shutoff for mining are also described. (authors)

Carter, E.E.; Carter, P.E. [Technologies Co, Texas (United States); Cooper, D.C. [Ph.D. Idaho National Laboratory, Idaho Falls, ID (United States)

2008-07-01T23:59:59.000Z

298

From Construction to Making Homes More Livable | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From Construction to Making Homes More Livable From Construction to Making Homes More Livable From Construction to Making Homes More Livable July 21, 2010 - 3:14pm Addthis Barry Moir has seen the ebb and flow of the construction business. After working nine years in museum construction, he lost his job and started the challenging process of finding work. With a background that also included rehabilitating homes, Moir found an opportunity as a building performance specialist with weatherization service provider ACTION, Inc., in Gloucester, Mass. Compared to his previous work, Moir says, "[ACTION] is much more satisfying. We can do a much more thorough job where we don't have to leave things undone due to funding." Moir was one of two new hires with the nonprofit which has weatherized than 230 homes through the American Recovery and Reinvestment Act. In total,

299

Construction or Extended Operation of Nuclear Plant (Vermont) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction or Extended Operation of Nuclear Plant (Vermont) Construction or Extended Operation of Nuclear Plant (Vermont) Construction or Extended Operation of Nuclear Plant (Vermont) < Back Eligibility Investor-Owned Utility Utility Program Info State Vermont Program Type Siting and Permitting Any petition for approval of construction of a nuclear energy generating plant within the state, or any petition for approval of the operation of a nuclear energy generating plant beyond the date established in a certificate of public good issued under this title, must be submitted to the public service board no later than four years before the date upon which the approval may take effect. Upon receipt of a petition for approval of construction or operation as provided under this section, the public service board shall notify the

300

From Construction to Making Homes More Livable | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From Construction to Making Homes More Livable From Construction to Making Homes More Livable From Construction to Making Homes More Livable July 21, 2010 - 3:14pm Addthis Barry Moir has seen the ebb and flow of the construction business. After working nine years in museum construction, he lost his job and started the challenging process of finding work. With a background that also included rehabilitating homes, Moir found an opportunity as a building performance specialist with weatherization service provider ACTION, Inc., in Gloucester, Mass. Compared to his previous work, Moir says, "[ACTION] is much more satisfying. We can do a much more thorough job where we don't have to leave things undone due to funding." Moir was one of two new hires with the nonprofit which has weatherized than 230 homes through the American Recovery and Reinvestment Act. In total,

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

MassSAVE (Electric) - Commercial New Construction Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MassSAVE (Electric) - Commercial New Construction Program MassSAVE (Electric) - Commercial New Construction Program MassSAVE (Electric) - Commercial New Construction Program < Back Eligibility Commercial Construction Industrial Installer/Contractor Institutional Local Government Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Manufacturing Other Construction Heat Pumps Heating Appliances & Electronics Commercial Lighting Lighting Maximum Rebate 70% of incremental cost of higher efficiency equipment, or an amount that buys down the incremental investment to a 1.5 year simple payback. Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Custom Lighting: $0.40 - $1.00/watt saved High Efficiency Fluorescent Systems: $10-$35/fixture High and Low Bay Fluorescents: $20 - $40/fixture

302

Improving the constructibility of the Clinch River breeder plant  

Science Conference Proceedings (OSTI)

The extended planning time which became available for Clinch River Breeder Reactor (CRBR) architect/engineers may eliminate some of the high materials and labor costs, shortages, and long lead times suffered by recent nuclear projects by allowing construction input into the planning. Since constructibility reviews are less disruptive during the conceptual design stage, a list of specific constructibility criteria has been regularly updated during the past 10 years and has solved several design problems in new technology. Several recommendations intended to save costs or make construction easier illustrate how the process developed. A scale model of the CRBR has helped to eliminate many potential construction problems in the design stage and to determine the best layout of pipe and electrical connections. Engineers can already identify over $25 million in cost avoidance on the project. (DCK)

Scott, W.W.

1981-02-01T23:59:59.000Z

303

Gradience, constructions and constraint systems  

Science Conference Proceedings (OSTI)

This paper is concerned with the question of quantifying gradient degrees of acceptability by introducing the notion of Density in the context of constructional constraint language processing. We first present here our framework for language processing, ...

Philippe Blache; Jean-Philippe Prost

2004-09-01T23:59:59.000Z

304

An Update on FLEXLAB Construction  

NLE Websites -- All DOE Office Websites (Extended Search)

construction with no safety incidents to date. The FLEXLAB team is now planning the commissioning phase of the project so that they will be ready to go when the exterior structures...

305

Detachable high heel shoe construction  

E-Print Network (OSTI)

The goal on this investigation was to develop a detachable high heel shoe construction that could enter the current high heel market. The impact of high heel shoes on women's fashion is enormous but there are associated ...

Morales, Alfredo Louis

2007-01-01T23:59:59.000Z

306

Sandwich Construction Solar Structural Facets  

DOE Green Energy (OSTI)

Silver/glass mirrors have excellent optical properties but need a method of support in order to be used in concentrating solar thermal systems. In collaboration with the Cummins dish/Stirling development program, they started investigating sandwich construction as a way to integrate silver/glass mirrors into solar optical elements. In sandwich construction, membranes such as sheet metal or plastic are bonded to the front and back of a core (like a sandwich). For solar optical elements, a glass mirror is bonded to one of the membranes. This type of construction has the advantages of a high strength-to-weight ratio, and reasonable material and manufacturing cost. The inherent stiffness of sandwich construction mirror panels also facilitates large panels. This can have cost advantages for both the amount of hardware required as well as reduced installation and alignment costs. In addition, by incorporating the panels into the support structure reductions in the amount of structural support required are potentially possible.

Diver, R. B.; Grossman, J.W.

1998-12-22T23:59:59.000Z

307

Underground Transmission Cable System Installation and Construction Practices Manual  

Science Conference Proceedings (OSTI)

Installation and construction remain the most expensive implementation components of underground transmission cable systems. Recent advancements in underground transmission have led to more demand for best practices and innovative ways to reduce installation and construction costs in a cable project. EPRI has funded many projects over the years to improve the efficiency and reduce the cost of underground transmission cable installation. Other organizations such as Association of Edison Illuminating Compa...

2009-12-22T23:59:59.000Z

308

Vectren Energy Delivery of Indiana (Electric) - Commercial New Construction  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vectren Energy Delivery of Indiana (Electric) - Commercial New Vectren Energy Delivery of Indiana (Electric) - Commercial New Construction Rebates (Indiana) Vectren Energy Delivery of Indiana (Electric) - Commercial New Construction Rebates (Indiana) < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit State Government Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Windows, Doors, & Skylights Maximum Rebate Custom/HVAC Systems: $100,000 or 50% of the total project cost Incentive cannot buy down project below 1.5 years payback. Program Info State Indiana Program Type Utility Rebate Program Rebate Amount HVAC Systems (New Construction): $0.12/kWh reduced

309

Construction Cost Analysis : Residential Construction Demonstration Project Cycle II.  

SciTech Connect

The Residential Construction Demonstration Project (RCDP) is designed to demonstrate new residential building techniques and product innovations which advance the stage-of-the-art in constructing energy-efficient electrically heated residences. A secondary purpose is to obtain documented cost and energy savings data from which to make accurate assessments of the cost-effectiveness of various conservation innovations. The project solicits participation of regional homebuilders by offering them financial incentives for constructing homes to the Model Conservation Standards (MCS) and including at least one innovation.'' The innovations are determined by BPA and the States prior to construction and represent construction techniques or energy saving products that might reduce the cost of building MCS homes, or expand the options available to builders in achieving MCS levels of energy efficiency in homes. Besides covering some of the additional risk for employing the innovation, the incentive payment guarantees that builders will provide certain amounts of information regarding the cost and acceptability of building the homes. In addition, an incentive is paid to homeowners for their participation in data collection efforts following construction. Several one-time'' tests were performed on the houses and homeowners were required to report energy consumption and temperature data on a weekly basis for approximately 18 months. BPA and the States compile the information obtained from the builders and homeowners. Access to this data is provided for the purpose of analyzing the cost and performance of the RCDP homes, as well as understanding the value of the various innovations that are tested. 25 tabs., 4 figs.

Barnett, Cole; Thor, Philip W.

1990-06-01T23:59:59.000Z

310

GRR/Section 7-NV-a - Permit to Construct and Permit to Operate | Open  

Open Energy Info (EERE)

7-NV-a - Permit to Construct and Permit to Operate 7-NV-a - Permit to Construct and Permit to Operate < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-NV-a - Permit to Construct and Permit to Operate 07NVAPermitToConstructAndPermitToOperate (3).pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Triggers None specified Click "Edit With Form" above to add content 07NVAPermitToConstructAndPermitToOperate (3).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative _ 7-NV-a.1 and 6-NV-a.2 - Has an Environmental Review been Completed for Construction? The developer must make sure to undergo an environmental process before

311

GRR/Section 6-CA-b - Construction Storm Water Program | Open Energy  

Open Energy Info (EERE)

6-CA-b - Construction Storm Water Program 6-CA-b - Construction Storm Water Program < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-CA-b - Construction Storm Water Program 06CABConstructionStormWaterProgram.pdf Click to View Fullscreen Contact Agencies California State Water Resources Control Board Regulations & Policies 40 CFR 122.2: Definitions Triggers None specified Click "Edit With Form" above to add content 06CABConstructionStormWaterProgram.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Construction activities requiring a Construction Storm Water General Permit must submit a Storm Water Pollution Prevention Plan and a Construction

312

GRR/Section 15-CA-a - Air Permit - Authority to Construct | Open Energy  

Open Energy Info (EERE)

GRR/Section 15-CA-a - Air Permit - Authority to Construct GRR/Section 15-CA-a - Air Permit - Authority to Construct < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-CA-a - Air Permit - Authority to Construct 15CAAAirPermitAuthorityToConstruct (1).pdf Click to View Fullscreen Contact Agencies California Air Resources Board Regulations & Policies Clean Air Act (42 USC 1857 et seq.) California Air Pollution Control Laws Triggers None specified Click "Edit With Form" above to add content 15CAAAirPermitAuthorityToConstruct (1).pdf 15CAAAirPermitAuthorityToConstruct (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer seeking to construct, modify, or operate a facility or

313

Document ID Number: RL-721  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Document ID Number: Document ID Number: RL-721 REV 4 NEPA REVIEW SCREENING FORM DOE/CX-00066 I. Project Title: Nesting Bird Deterrent Study at the 241-C Tank Farm CX B3.8, "Outdoor Terrestrial Ecological and Environmental Research" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform an outdoor, terrestrial ecological research study to attempt to control and deter nesting birds at the 241-C Tank Farm. This will be a preventative study to test possible methods for controlling &/or minimizing the presence and impacts of nesting birds inside the tank farm. A nesting bird

314

Stochastic Low Reynolds Number Swimmers  

E-Print Network (OSTI)

As technological advances allow us to fabricate smaller autonomous self-propelled devices, it is clear that at some point directed propulsion could not come from pre-specified deterministic periodic deformation of the swimmer's body and we need to develop strategies to extract a net directed motion from a series of random transitions in the conformation space of the swimmer. We present a theoretical formulation to describe the "stochastic motor" that drives the motion of low Reynolds number swimmers based on this concept, and use it to study the propulsion of a simple low Reynolds number swimmer, namely, the three-sphere swimmer model. When the detailed-balanced is broken and the motor is driven out of equilibrium, it can propel the swimmer in the required direction. The formulation can be used to study optimal design strategies for molecular-scale low Reynolds number swimmers.

Ramin Golestanian; Armand Ajdari

2009-01-12T23:59:59.000Z

315

Methodical Construction of Database Management Systems  

E-Print Network (OSTI)

Although more and more database management systems are being developed, constructing such systems in an engineering fashion remains an open problem. An engineering attitude towards construction not only tells how to implement a database management system, but also tries to minimize construction time. Hence, the prime objective of an engineering-style construction approach is construction efficiency.

Andreas Geppert; Erlangung Der; Philosophischen Doktorwrde; Vorgelegt Der; Begutachtet Von; Den Herren; K. R. Dittrich; K. Bauknecht; Prof Dr; Prof Dr; Prof Dr; M. Glinz

1994-01-01T23:59:59.000Z

316

Quarterly Construction Status Report Period Ending: June 30, 2012  

E-Print Network (OSTI)

of each project together with progress photographs and the project manager's estimate of the cost to complete the project. Because the reports contain projected costs and also account for budget risks #12;Quarterly Construction Status Report Period Ending: June 30, 2012 Project Number Project Index

Holsinger, Kent

317

U.S. Number of Operable Refineries as of January 1 (Number of ...  

U.S. Energy Information Administration (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1980's: 301: 258: 247: 223: 216: 219: 213: 204: 1990's: 205: 202: 199: 187: 179: 175: NA ...

318

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

1 1 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

319

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

9 9 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

320

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

9 9 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

1 1 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 7,279 6,446 3,785 3,474 3,525 Total................................................................... 7,279 6,446 3,785 3,474 3,525 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 7,279 6,446 3,785 3,474 3,525 Nonhydrocarbon Gases Removed ..................... 788 736 431

322

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

5 5 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 15,206 15,357 16,957 17,387 18,120 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 463,929 423,672 401,396 369,624 350,413 From Oil Wells.................................................. 63,222 57,773 54,736 50,403 47,784 Total................................................................... 527,151 481,445 456,132 420,027 398,197 Repressuring ...................................................... 896 818 775 714 677 Vented and Flared.............................................. 527 481 456 420 398 Wet After Lease Separation................................

323

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

7 7 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 9 8 7 9 6 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 368 305 300 443 331 From Oil Wells.................................................. 1 1 0 0 0 Total................................................................... 368 307 301 443 331 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 368 307 301 443 331 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

324

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

7 7 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 98 96 106 109 111 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 869 886 904 1,187 1,229 From Oil Wells.................................................. 349 322 288 279 269 Total................................................................... 1,218 1,208 1,193 1,466 1,499 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 5 12 23 Wet After Lease Separation................................ 1,218 1,208 1,188 1,454 1,476 Nonhydrocarbon Gases Removed .....................

325

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

9 9 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 4 4 4 4 4 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 7 7 6 6 5 Total................................................................... 7 7 6 6 5 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 7 7 6 6 5 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

326

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

3 3 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

327

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

3 3 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

328

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

3 3 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

329

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

1 1 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

330

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

7 7 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 380 350 400 430 280 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 1,150 2,000 2,050 1,803 2,100 Total................................................................... 1,150 2,000 2,050 1,803 2,100 Repressuring ...................................................... NA NA NA 0 NA Vented and Flared.............................................. NA NA NA 0 NA Wet After Lease Separation................................ 1,150 2,000 2,050 1,803 2,100 Nonhydrocarbon Gases Removed .....................

331

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

5 5 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

332

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

1 1 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 1,502 1,533 1,545 2,291 2,386 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 899 1,064 1,309 1,464 3,401 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 899 1,064 1,309 1,464 3,401 Repressuring ...................................................... NA NA NA 0 NA Vented and Flared.............................................. NA NA NA 0 NA Wet After Lease Separation................................ 899 1,064 1,309 1,464 3,401 Nonhydrocarbon Gases Removed .....................

333

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

9 9 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

334

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

3 3 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

335

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

7 7 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

336

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

3 3 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 7 7 5 7 7 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 34 32 22 48 34 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 34 32 22 48 34 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 34 32 22 48 34 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

337

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

1 1 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

338

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

1 1 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ......................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells...................................................... 0 0 0 0 0 From Oil Wells........................................................ 0 0 0 0 0 Total......................................................................... 0 0 0 0 0 Repressuring ............................................................ 0 0 0 0 0 Vented and Flared .................................................... 0 0 0 0 0 Wet After Lease Separation...................................... 0 0 0 0 0 Nonhydrocarbon Gases Removed............................ 0 0 0 0 0 Marketed Production

339

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

7 7 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

340

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

3 3 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

7 7 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 17 20 18 15 15 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 1,412 1,112 837 731 467 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 1,412 1,112 837 731 467 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 1,412 1,112 837 731 467 Nonhydrocarbon Gases Removed ..................... 198 3 0 0 0 Marketed Production

342

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

7 7 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

343

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

5 5 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

344

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

3 3 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 0 0 0 0 0 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 0 0 0 0 0 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 0 0 0 0 0 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 0 0 0 0 0 Nonhydrocarbon Gases Removed ..................... 0 0 0 0 0 Marketed Production ..........................................

345

Berkeley Lab Site Construction Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction Projects Construction Projects Old Town Demolition Project Manager: Ted Mankowski, TMankowski@lbl.gov Seismic Upgrades: Phase 2 Project Manager: Jack Heffernan, JSHeffernan@lbl.gov User Test Bed Facility/ FLEXLAB Project Manager: Dan Galvez, DCGalvez@lbl.gov UC Capital Projects Computational Research and Theory Facility Project Manager: Henry Martinez, HMartinez@lbl.gov Solar Energy Research Center (SERC) Project Manager: Jules Feher, JFeher@lbl.gov In Partnership with UC Berkeley Second Campus Sr. Project Manager: Doug Lockhart, DELockhart@lbl.gov What's Happening in the Next Several Weeks: Computational Research & Theory Facility: Currently, the main construction activities are steel and deck placement. The steel placement is due to be complete in December of 2013 and the exterior skin will follow. Project

346

Computers could aid construction projects  

SciTech Connect

The procedures currently used by engineering companies in planning their work on a segmented basis are a very small step from the development of a computer model encompassing the total scope of a very large engineering construction effort. When the computer model concept has been accepted and implemented, the results are a harmonious relationship between divergent groups, replacing the frequent scrambling and reaction among engineering, procurement, and construction that often takes place in completing a capital project. It is a small step to be able to derive all the benefits of early planning based upon logically developed knowledge. Common scheduling techniques used to provide a scenario for a total coordinated effort could provide a computer model of an entire engineering-construction project. To date, it is this concept that has eluded the industry.

Leon, L.

1983-10-01T23:59:59.000Z

347

Plant construction and community stress  

SciTech Connect

Communities and utilities can project the impact of construction workers, their families, and the services they require before a project begins and take steps to mitigate any negative effects. Systematic socio-economic assessment is only a decade old, but has gradually taken on the importance of environmental impact assessments. An Electric Power Research Institute (EPRI) assessment of 12 case-study plants and their impact on neighboring communities found that population influx was more moderate than expected because of an indigenous work force, the willingness of new workers to drive long distances rather than relocate, and the shift in construction crafts required during the construction phase. Economic impacts were often more positive than expected. The study also underscored the need for proper assessment and appropriate mitigation planning. 2 references. (DCK)

Lihach, N.; Wyzga, R.

1982-11-01T23:59:59.000Z

348

Comparison Test for Infection Control Barriers for Construction in Healthcare  

E-Print Network (OSTI)

Understanding the extent of infection control measures to be taken to protect immunosuppressed and other types of patients from airborne infection agents during construction is crucial knowledge for both healthcare and construction professionals. The number of aspergillosis-related fatalities due to dust transmission during construction activity has decreased with the improvement of antifungal therapy, however the illness is particularly debilitating and the treatment is not always successful. This experimental work is the first stage in a research program to develop better dust controls for construction at existing medical facilities to reduce the incidence of dust borne fungi, such as Aspergillus spp. To better protect at-risk patients from exposure to Aspergillus spp. and other airborne fungal infections, an experiment was conducted to determine what materials can be used to create a barrier for infection control to moderate particle transmission from the construction area to the treatment area. This study investigated the relationship between construction barriers and particle transmission. A new experimental procedure and equipment simulates the transmission of disturbed dust from construction activity across a barrier. The effective of the barrier is determined from measured particle count on filter. The results show that an effective barrier manufactured from simple and readily available building supplies stops the transmission of 12-micron dust particles under a standard set of conditions. The test provides a simple and cost effective method to compare transmission rates for dust.

Bassett, Aimee

2013-05-01T23:59:59.000Z

349

CONSTRUCTION OF NUCLEAR FUEL ELEMENTS  

DOE Patents (OSTI)

>A rib arrangement and an end construction for nuclearfuel elements laid end to end in a coolant tube are described. The rib arrangement is such that each fuel element, when separated from other fuel elements, fits loosely in the coolant tube and so can easily be inserted or withdrawn from the tube. The end construction of the fuel elements is such that the fuel elements when assembled end to end are keyed against relative rotation, and the ribs of each fuel element cooperate with the ribs of the adjacent fuel elements to give the assembled fuel elements a tight fit with the coolant tube. (AEC)

Weems, S.J.

1963-09-24T23:59:59.000Z

350

Undergraduate Catalog Phone Numbers & Address  

E-Print Network (OSTI)

Interest Research Exemption Programs 11 ReglsJrationPeriod III 6 Group (WashPIRG) 14 Faculty Number 9 State NaUonal Guard ' . , Full-Time Student Requirements __'_ 9 Service and Research Credit 10 Tuition notice. All announcements in the Time Schedule are subject to change without notice and do not constitute

Kelly, Scott David

351

MOTOR POOL RESERVATIONS Reservation Number:_______________  

E-Print Network (OSTI)

MOTOR POOL RESERVATIONS Reservation Number:_______________ Evanston campus: Chicago campus: 2020: 312/503-9243 E-mail: motor-pool@northwestern.edu E-mail: motor-pool@northwestern.edu Hours: 8:00 a reservations require the "Organization Authorization for University Vehicles" form to be faxed to Motor Pool

Shull, Kenneth R.

352

Evaluating flexibility in railroad construction projects  

E-Print Network (OSTI)

This thesis aims to valuate flexibilities in a large-scale railroad construction project. In general, a railroad construction project involves a large amount of flexibilities due to its long construction period and conflicts ...

Oh, Choong Ryun, 1972-

2005-01-01T23:59:59.000Z

353

U.S. Maximum Number of Active Crews Engaged in Seismic Surveying (Number of  

Gasoline and Diesel Fuel Update (EIA)

Maximum Number of Active Crews Engaged in Seismic Surveying (Number of Elements) Maximum Number of Active Crews Engaged in Seismic Surveying (Number of Elements) U.S. Maximum Number of Active Crews Engaged in Seismic Surveying (Number of Elements) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2000 0 0 62 63 59 63 58 61 59 63 62 65 2001 61 61 63 65 64 60 58 56 54 58 59 58 2002 54 57 54 50 51 50 52 50 56 57 50 43 2003 40 41 41 40 38 39 41 43 39 39 38 42 2004 43 45 45 45 44 49 48 49 48 48 49 50 2005 52 53 51 50 55 57 54 55 56 57 57 58 2006 55 57 59 58 58 57 66 62 63 64 65 64 2007 63 63 68 71 70 69 69 71 73 77 79 75 2008 76 77 75 72 73 73 72 72 NA 77 72 73 2009 75 76 72 70 65 60 61 60 60 63 62 63 2010 64 65 63 66 67 67 67 65 64 62 62 62

354

Nuclear power plant construction activity, 1988  

SciTech Connect

Nuclear Power Plant Construction Activity 1988 presents cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1988. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors.

1989-06-14T23:59:59.000Z

355

CONSTRUCTION SAFETY MANUAL ADMINISTRATIVE POLICIES  

E-Print Network (OSTI)

of Steel Construction A.2.9 Demolition using Mechanical Equipment A.2.10 Training A.3 Electrical A.3 Equipment A.3.11 Electrical Safety Workbook and Permits A.4 Control of Hazardous Energy (Lockout / Tagout) 4, General industry Safety Orders, Cranes and Other Hoisting Equipment and PUB-3000, Chapter 5. A.1

Knowles, David William

356

SF-424 A Budget Information - Non Construction Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Applicant Name:",,,,"Award Number:" Applicant Name:",,,,"Award Number:" "Budget Information - Non Construction Programs" "OMB Approval No. 0348-0044" "Section A - Budget Summary" ,"Grant Program Function or Activity","Catalog of Federal Domestic Assistance Number","Estimated Unobligated Funds",,"New or Revised Budget" ,,,"Federal ","Non-Federal ","Federal","Non-Federal","Total" ,"(a)","(b)","(c )","(d)","(e)","(f)","(g)" "1.",,,,,,,0 "2.",,,,,,,0 "3.",,,,,,,0 "4.",,,,,,,0 "5.","Totals",,0,0,0,0,0 "Section B - Budget Categories"

357

Construction Timing and Expectations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Timing and Expectations Construction Timing and Expectations Construction Timing and Expectations October 16, 2013 - 5:07pm Addthis Creating a detailed construction schedule that allows all the project elements to be coordinated in a timely manner is fundamental to any successful construction project. The construction schedule should take into account that many tasks cannot be started before others are finished. It should also account for special schedule considerations related to renewable energy systems. Key elements of most new construction or major renovation projects include landscape, structural, architectural, mechanical, electrical, plumbing, communication systems, and renewable energy systems. Maintaining the highest quality of construction across all elements is fundamental to any

358

EDIG Construction Management | Open Energy Information  

Open Energy Info (EERE)

Search Page Edit with form History Facebook icon Twitter icon EDIG Construction Management Jump to: navigation, search Name EDIG Construction Management Place Israel Product...

359

Pantex Former Workers, Construction Worker Screening Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pantex Former Workers, Construction Worker Screening Project Pantex Former Workers, Construction Worker Screening Project Project Name: Former Pantex Worker Medical Surveillance...

360

RIN Number 1904-AB68  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Procurement of Energy Efficient Products Federal Procurement of Energy Efficient Products RIN NUMBER: 1904-AB68 CLOSING DATE: August 20, 2007 COMMENT NUMBER DATE RECEIVED/ DATE OF LETTER NAME & TITLE OF COMMENTATOR AFFILIATION & ADDRESS OF COMMENTATOR 1 ? 7/31/07 Edwin Pinero Federal Environmental Executive Office of the Federal Environmental Executive 1200 Pennsylvania Avenue, NW Mail Code 1600J Washington, DC 20460 2 8/8/07 (e-mail) Bob Null President Arkansas Lamp Manufacturing bnull@arkansaslamp.com 3 8/10/07 (e-mail) Dawn Gunning Environmental Program Manager Department of Justice Dawn.M.Gunning@usdoj.gov 4 8/14/07 8/14/07 Kyle Pitsor Vice President, Government Relations National Electrical Manufacturers Association 1300 North 17th Street, Suite 1752 Rosslyn, VA 22209

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

RIN Number 1904-AB68  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RULEMAKING TITLE: Federal Procurement of Energy Efficient Products RULEMAKING TITLE: Federal Procurement of Energy Efficient Products RIN NUMBER: 1904-AB68 CLOSING DATE: August 20, 2007 COMMENT NUMBER DATE RECEIVED/ DATE OF LETTER NAME & TITLE OF COMMENTATOR AFFILIATION & ADDRESS OF COMMENTATOR 1 ? 7/31/07 Edwin Pinero Federal Environmental Executive Office of the Federal Environmental Executive 1200 Pennsylvania Avenue, NW Mail Code 1600J Washington, DC 20460 2 8/8/07 (e-mail) Bob Null President Arkansas Lamp Manufacturing bnull@arkansaslamp.com 3 8/10/07 (e-mail) Dawn Gunning Environmental Program Manager Department of Justice Dawn.M.Gunning@usdoj.gov 4 8/14/07 8/14/07 Kyle Pitsor Vice President, Government Relations National Electrical Manufacturers Association 1300 North 17th Street, Suite 1752

362

Microsoft Word - Number of Public Involvement Deliverables _2_.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Document Document Public Involvement Deliverables Number of Public Involvement Deliverables Completed In a Typical Fiscal Year * Nevada Site Office Manager Environmental Management Weekly Reports: 52 per year * DOE Headquarters Environmental Management Weekly Report: 52 per year * Fact sheets: 20 * Briefings: approximately 100 presentations per year, averaging 15 slides each * Drafting of articles for distribution/posting as EM News Flash alerts: 10-12 per year * Videos: 1 'full-length' production video (@ ~10 minutes or more): 2-3 feature production videos (@ ~2 minutes) and numerous (+150) video clips and raw video * Maintenance of the web-based Environmental Management Information System (EMIS) Public Involvement portion. Maintenance includes uploading briefings,

363

DOE - Office of Legacy Management -- Chemical Construction Co Linden Pilot  

Office of Legacy Management (LM)

Chemical Construction Co Linden Chemical Construction Co Linden Pilot Plant - NJ 12 FUSRAP Considered Sites Site: Chemical Construction Co., Linden Pilot Plant (NJ.12 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Chemical Construction Corporation Pilot Plant Chemico NJ.12-1 NJ.12-2 Location: Linden , New Jersey NJ.12-3 Evaluation Year: 1987 NJ.12-4 Site Operations: Performed research and development operations under AEC contract to develop a process for recovering uranium, cobalt, nickel, and copper from low grade residues. NJ.12-5 NJ.12-6 NJ.12-7 Site Disposition: Eliminated - Potential for contamination considered remote due to nature and duration of the operations NJ.12-4 NJ.12-8 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NJ.12-6

364

Austin Energy - Commercial New Construction Efficiency Rebates | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Austin Energy - Commercial New Construction Efficiency Rebates Austin Energy - Commercial New Construction Efficiency Rebates Austin Energy - Commercial New Construction Efficiency Rebates < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Other Appliances & Electronics Commercial Lighting Lighting Maximum Rebate $200,000 per site, per fiscal year Program Info State Texas Program Type Utility Rebate Program Rebate Amount Tier 1: 125% of qualifying rebates Tier 2: 100% of qualifying rebates Tier 3: 50% of qualifying rebates Provider Austin Energy Austin Energy offers incentives for the construction and major renovation of commercial buildings within its service territory. The program rewards customers by using a tiered payment format, which provides incentives to

365

AEP Ohio - Commercial New Construction Energy Efficiency Rebate Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AEP Ohio - Commercial New Construction Energy Efficiency Rebate AEP Ohio - Commercial New Construction Energy Efficiency Rebate Program (Ohio) AEP Ohio - Commercial New Construction Energy Efficiency Rebate Program (Ohio) < Back Eligibility Commercial Industrial Local Government Municipal Utility Nonprofit Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Water Heating Maximum Rebate General: 50% of total project cost; Contact AEP Ohio Design Incentives: 50% of cost up to $50,000 Program Info State Ohio Program Type Utility Rebate Program Rebate Amount Custom: $0.08/kWh first year savings and $100/peak kW reduction

366

EA-1790: Construction and Operation of a Heterogeneous Feed Biorefinery  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1790: Construction and Operation of a Heterogeneous Feed EA-1790: Construction and Operation of a Heterogeneous Feed Biorefinery Enerkem Corporation Pontotoc, MS EA-1790: Construction and Operation of a Heterogeneous Feed Biorefinery Enerkem Corporation Pontotoc, MS SUMMARY The U.S. Department of Energy (DOE or the Department) is proposing to provide cost share funding to Enerkem, Inc (Enerkem) for the final design, construction, and operation of a proposed Heterogeneous Feed Biorefinery Project to be located in Pontotoc, Mississippi (hereafter referred to as the biorefinery or the proposed project). The biorefinery would use the dried and post-sorted biomass fraction of municipal solid waste (MSW) and wood biomass as feedstock. Enerkem's biorefinery would produce approximately 10 million gallons (38 million liters) of ethanol per year

367

DOE Announces $160 Million for Biorefinery Construction and Highlights New  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

$160 Million for Biorefinery Construction and $160 Million for Biorefinery Construction and Highlights New Agricultural Program to Promote Biofuels DOE Announces $160 Million for Biorefinery Construction and Highlights New Agricultural Program to Promote Biofuels February 22, 2006 - 12:11pm Addthis Funding Paves the Way for Diversifying America's Energy Mix DECATUR, IL - Energy Secretary Samuel W. Bodman, today announced $160 million in cost-shared funding over three years to construct up to three biorefineries in the United States. The Secretary made the announcement while visiting the Archer Daniels Midland Ethanol Plant, his second of four stops to promote the Advanced Energy Initiative announced by President Bush in his State of the Union address. Secretary Bodman also highlighted the United States Department of Agriculture's announcement today of almost $188

368

ARE Update Volume 11, Number 6  

E-Print Network (OSTI)

ceramic production, mining glass and electronics production runoff no major sources thermal pollution construction and electronic industry

Karp, Larry; Hilger, James; Rafert, James G; Villas-Boas, Sofia B; Farzin, Y. Hossein; Grogan, Kelly

2008-01-01T23:59:59.000Z

369

Alternative Fuels Data Center: Clean Construction USA  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Construction USA Construction USA to someone by E-mail Share Alternative Fuels Data Center: Clean Construction USA on Facebook Tweet about Alternative Fuels Data Center: Clean Construction USA on Twitter Bookmark Alternative Fuels Data Center: Clean Construction USA on Google Bookmark Alternative Fuels Data Center: Clean Construction USA on Delicious Rank Alternative Fuels Data Center: Clean Construction USA on Digg Find More places to share Alternative Fuels Data Center: Clean Construction USA on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Clean Construction USA Clean Construction USA is a voluntary program that promotes the reduction of diesel exhaust emissions from construction equipment and vehicles by encouraging proper operations and maintenance, use of emissions-reducing

370

New Jersey SmartStart Buildings - New Construction and Retrofits |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » New Jersey SmartStart Buildings - New Construction and Retrofits New Jersey SmartStart Buildings - New Construction and Retrofits < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Manufacturing Other Construction Heat Pumps Appliances & Electronics Commercial Lighting Lighting Water Heating Maximum Rebate General: incentives may be limited to $500,000 per utility account per year. Custom Measures: limited to lesser of $0.16/kWh or $1.60/therm saved annually; 50% of total costs; or buydown to a 1-year payback period Program Info Funding Source New Jersey Societal Benefits Charge (public benefits fund)

371

Fiscal Year 2009 Revegetation Assessment  

SciTech Connect

This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

Michael Lewis

2009-10-01T23:59:59.000Z

372

Fiscal Year 2010 Revegetation Assessment  

SciTech Connect

This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

Jenifer Nordstrom; Mike Lewis

2010-11-01T23:59:59.000Z

373

Using virtual environments to support electrical safety awareness in construction  

Science Conference Proceedings (OSTI)

Safety is important to the construction industry. Every year lives are lost due to accidents that could have been prevented with proper training and awareness of workplace hazards. Electrical safety hazards are the cause of about a quarter of all deaths ...

Dong Zhao; Jason Lucas; Walid Thabet

2009-12-01T23:59:59.000Z

374

Design, construction, and experiments with a compass gait walking robot  

E-Print Network (OSTI)

In recent years a number of new computational techniques for the control of nonlinear and underactuated systems have been developed and tested largely in theory and simulation. In order to better understand how these new ...

Jackowski, Zachary John

2011-01-01T23:59:59.000Z

375

SRS Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SAVANNAH RIVER BUILDING TRADES SAVANNAH RIVER BUILDING TRADES MEDICAL SCREENING PROGRAM A NEEDS ASSESSMENT Submitted by The Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Augusta, Georgia Building and Construction Trades Council In Cooperation with Duke University Medical Center Medlantic Research Institute United Brotherhood of Carpenters Health and Safety Fund University of Cincinnati Medical Center Zenith Administrators, Inc. June 23, 1998 Contents Summary and Response to Needs Assessment Questions , page i 1. Introduction and Rationale, 1 a. Aims, 1 b. Focus of Needs Assessment, 1 c. Organization, 1 d. Rationale for Program, 2 2. Need for Medical Evaluation and Notification, 3 a. Medical Surveillance, 3

376

Schedule planning for construction projects  

SciTech Connect

Operating contractors of government-owned facilities manage construction projects having a maximum value of $1,000,000. Successful execution is dependent upon pragmatic scheduling. Such scheduling requires that all activities (both engineering and non-engineering) be integrated into a compatible sequence of events with adequate time allowed for each event. To develop realistic schedules, project event standards and program measures of performance have been established.

Shunk, W.A.

1982-01-01T23:59:59.000Z

377

Superconducting Cable Construction and Testing  

Science Conference Proceedings (OSTI)

Superconducting cables, carrying three to five times more power than conventional cables, can meet increasing power demands in urban areas via retrofit applications. These high capacity cables will allow utilities to greatly enhance capacity, thereby giving the grid more flexibility and reliability. This report describes the development, construction, and testing of a superconducting cable system. Background In the late eighties, a new class of ceramic oxides was discovered with superconducting propertie...

2000-11-10T23:59:59.000Z

378

GRR/Section 6-ID-b - Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

6-ID-b - Construction Storm Water Permit 6-ID-b - Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-ID-b - Construction Storm Water Permit 06IDBConstructionStormwaterPermit.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Triggers None specified Click "Edit With Form" above to add content 06IDBConstructionStormwaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 6-ID-b.1 - EPA Construction General Permit Idaho does not have authority from the United States Environmental Protection Agency to issue a construction storm water permit. See Flowchart

379

GRR/Section 6-HI-b - Hawaii Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

b - Hawaii Construction Storm Water Permit b - Hawaii Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-HI-b - Hawaii Construction Storm Water Permit 06HIBHawaiiConstructionStormWaterPermit.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Health Clean Water Branch Regulations & Policies Section 402 of the Clean Water Act (33 U.S.C. 1251 et seq.) Hawaii Administrative Rules 11-55 Triggers None specified Click "Edit With Form" above to add content 06HIBHawaiiConstructionStormWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer must prepare and submit a Notice of Intent and associated

380

GRR/Section 15-ID-a - Air Quality Permit - Permit to Construct | Open  

Open Energy Info (EERE)

15-ID-a - Air Quality Permit - Permit to Construct 15-ID-a - Air Quality Permit - Permit to Construct < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-ID-a - Air Quality Permit - Permit to Construct 15IDAAirQualityPermitPermitToConstruct (1).pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.01 Triggers None specified Click "Edit With Form" above to add content 15IDAAirQualityPermitPermitToConstruct (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Environmental Quality (DEQ) requires an air quality

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

GRR/Section 7-OR-a - State Plant Construction | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 7-OR-a - State Plant Construction GRR/Section 7-OR-a - State Plant Construction < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-OR-a - State Plant Construction 07ORAStatePlantConstruction (1).pdf Click to View Fullscreen Contact Agencies Oregon Department of Energy Regulations & Policies Facility siting rules and statutes Triggers None specified Click "Edit With Form" above to add content 07ORAStatePlantConstruction (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The State Siting Board has siting jurisdiction over electric power generating plants described as energy facilities in Oregon Revised Statute

382

GRR/Section 6-FD-a - Storm Water Construction General Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 6-FD-a - Storm Water Construction General Permit GRR/Section 6-FD-a - Storm Water Construction General Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-FD-a - Storm Water Construction General Permit 06FDAEPAConstructionGeneralPermitConstructionStormwater.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Regulations & Policies 40 CFR 122.26 Triggers None specified Click "Edit With Form" above to add content 06FDAEPAConstructionGeneralPermitConstructionStormwater.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The United States Environmental Protection Agency (EPA) issues a National

383

GRR/Section 7 - Power Plant Siting, Construction, and Regulation Overview |  

Open Energy Info (EERE)

GRR/Section 7 - Power Plant Siting, Construction, and Regulation Overview GRR/Section 7 - Power Plant Siting, Construction, and Regulation Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7 - Power Plant Siting, Construction, and Regulation Overview 07PowerPlantSitingConstructionOverview (2).pdf Click to View Fullscreen Contact Agencies Federal Energy Regulatory Commission Triggers None specified Click "Edit With Form" above to add content 07PowerPlantSitingConstructionOverview (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The power plant's location, size, type of customer the power plant sells energy to, and whether the power plant sells energy in "interstate

384

The Scalable Parallel Random Number Generators (SPRNG) ...  

Science Conference Proceedings (OSTI)

... Random Number Generators (SPRNG) Library is a widely used tool for random number generation on high-performance computing platforms. ...

2011-05-04T23:59:59.000Z

385

GRR/Section 8-CA-c - Permit to Construct | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 8-CA-c - Permit to Construct < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-CA-c - Permit to Construct 08CACPermitToConstruct.pdf Click to View Fullscreen Contact Agencies California Public Utilities Commission Regulations & Policies California Environmental Quality Act General Order 131-D Triggers None specified Click "Edit With Form" above to add content 08CACPermitToConstruct.pdf 08CACPermitToConstruct.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Public utilities must receive a Permit to Construct from the California

386

Project Construction Team | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Construction Team Project Construction Team Project Construction Team October 16, 2013 - 5:06pm Addthis Photo of two men reviewing a large print document. Both men are wearing construction hats and bright vests. A construction team reviews plans for a 1.9 megawatt methane power generator for a U.S. Marine Corps landfill gas-to-energy project. Assembling the right project construction team is crucial and begins with the request for proposal (RFP). Federal agencies create and RFP for construction services using construction documents developed during the final stage of building design. Construction documents are the blueprints on which every project is built and will be used to generate bids for the construction phase of the project. Renewable energy will either be specified in detail in the

387

Generalized Chinese restaurant construction of exchangeable Gibbs partitions and related results  

E-Print Network (OSTI)

By resorting to sequential constructions of exchangeable random partitions (Pitman, 2006), and exploiting some known facts about generalized Stirling numbers, we derive a generalized Chinese restaurant process construction of exchangeable Gibbs partitions of type $\\alpha$ (Gnedin and Pitman, 2006). Our construction represents the natural theoretical probabilistic framework in which to embed some recent results about a Bayesian nonparametric treatment of estimation problems arising in genetic experiment under Gibbs, species sampling, models priors.

Cerquetti, Annalisa

2008-01-01T23:59:59.000Z

388

Nuclear power plant construction activity, 1986  

SciTech Connect

Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors.

1987-07-24T23:59:59.000Z

389

Fiscal Year 2012 Revegetation Assessment  

Science Conference Proceedings (OSTI)

This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

Jenifer Nordstrom

2012-11-01T23:59:59.000Z

390

Total Number of Operable Refineries  

U.S. Energy Information Administration (EIA) Indexed Site

Data Series: Total Number of Operable Refineries Number of Operating Refineries Number of Idle Refineries Atmospheric Crude Oil Distillation Operable Capacity (B/CD) Atmospheric Crude Oil Distillation Operating Capacity (B/CD) Atmospheric Crude Oil Distillation Idle Capacity (B/CD) Atmospheric Crude Oil Distillation Operable Capacity (B/SD) Atmospheric Crude Oil Distillation Operating Capacity (B/SD) Atmospheric Crude Oil Distillation Idle Capacity (B/SD) Vacuum Distillation Downstream Charge Capacity (B/SD) Thermal Cracking Downstream Charge Capacity (B/SD) Thermal Cracking Total Coking Downstream Charge Capacity (B/SD) Thermal Cracking Delayed Coking Downstream Charge Capacity (B/SD Thermal Cracking Fluid Coking Downstream Charge Capacity (B/SD) Thermal Cracking Visbreaking Downstream Charge Capacity (B/SD) Thermal Cracking Other/Gas Oil Charge Capacity (B/SD) Catalytic Cracking Fresh Feed Charge Capacity (B/SD) Catalytic Cracking Recycle Charge Capacity (B/SD) Catalytic Hydro-Cracking Charge Capacity (B/SD) Catalytic Hydro-Cracking Distillate Charge Capacity (B/SD) Catalytic Hydro-Cracking Gas Oil Charge Capacity (B/SD) Catalytic Hydro-Cracking Residual Charge Capacity (B/SD) Catalytic Reforming Charge Capacity (B/SD) Catalytic Reforming Low Pressure Charge Capacity (B/SD) Catalytic Reforming High Pressure Charge Capacity (B/SD) Catalytic Hydrotreating/Desulfurization Charge Capacity (B/SD) Catalytic Hydrotreating Naphtha/Reformer Feed Charge Cap (B/SD) Catalytic Hydrotreating Gasoline Charge Capacity (B/SD) Catalytic Hydrotreating Heavy Gas Oil Charge Capacity (B/SD) Catalytic Hydrotreating Distillate Charge Capacity (B/SD) Catalytic Hydrotreating Kerosene/Jet Fuel Charge Capacity (B/SD) Catalytic Hydrotreating Diesel Fuel Charge Capacity (B/SD) Catalytic Hydrotreating Other Distillate Charge Capacity (B/SD) Catalytic Hydrotreating Residual/Other Charge Capacity (B/SD) Catalytic Hydrotreating Residual Charge Capacity (B/SD) Catalytic Hydrotreating Other Oils Charge Capacity (B/SD) Fuels Solvent Deasphalting Charge Capacity (B/SD) Catalytic Reforming Downstream Charge Capacity (B/CD) Total Coking Downstream Charge Capacity (B/CD) Catalytic Cracking Fresh Feed Downstream Charge Capacity (B/CD) Catalytic Hydro-Cracking Downstream Charge Capacity (B/CD) Period:

391

Role of mobile technology in the construction industry – a case study  

Science Conference Proceedings (OSTI)

The construction industry is facing a number of pressures to decrease costs, improve productivity and have a competitive edge in terms of quality of service and customer satisfaction. Recent advancements in mobile technology provide new avenues for addressing ... Keywords: New Zealand, adoption barriers, construction industry, mobile communications, mobile fax, mobile technologies, productivity, remote site, workflow

Sitalakshmi Venkatraman; Pak Yoong

2009-01-01T23:59:59.000Z

392

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

5 5 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 21,507 32,672 33,279 34,334 35,612 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 1,473,792 1,466,833 1,476,204 1,487,451 1,604,709 From Oil Wells.................................................. 139,097 148,551 105,402 70,704 58,439 Total................................................................... 1,612,890 1,615,384 1,581,606 1,558,155 1,663,148 Repressuring ...................................................... NA NA NA 0 NA Vented and Flared.............................................. NA NA NA 0 NA Wet After Lease Separation................................

393

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

1 1 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 94 95 100 117 117 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 13,527 13,846 15,130 14,524 15,565 From Oil Wells.................................................. 42,262 44,141 44,848 43,362 43,274 Total................................................................... 55,789 57,987 59,978 57,886 58,839 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 3,290 3,166 2,791 2,070 3,704 Wet After Lease Separation................................ 52,499 54,821 57,187 55,816 55,135

394

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

1 1 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 997 1,143 979 427 437 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 109,041 131,608 142,070 156,727 171,915 From Oil Wells.................................................. 5,339 5,132 5,344 4,950 4,414 Total................................................................... 114,380 136,740 147,415 161,676 176,329 Repressuring ...................................................... 6,353 6,194 5,975 6,082 8,069 Vented and Flared.............................................. 2,477 2,961 3,267 3,501 3,493 Wet After Lease Separation................................

395

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

9 9 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 36,000 40,100 40,830 42,437 44,227 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 150,000 130,853 157,800 159,827 197,217 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 150,000 130,853 157,800 159,827 197,217 Repressuring ...................................................... NA NA NA 0 NA Vented and Flared.............................................. NA NA NA 0 NA Wet After Lease Separation................................ 150,000 130,853 157,800 159,827 197,217

396

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

3 3 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year.................................... 4,359 4,597 4,803 5,157 5,526 Production (million cubic feet) Gross Withdrawals From Gas Wells ................................................ 555,043 385,915 380,700 365,330 333,583 From Oil Wells .................................................. 6,501 6,066 5,802 5,580 5,153 Total................................................................... 561,544 391,981 386,502 370,910 338,735 Repressuring ...................................................... 13,988 12,758 10,050 4,062 1,307 Vented and Flared .............................................. 1,262 1,039 1,331 1,611 2,316 Wet After Lease Separation................................

397

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

5 5 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 3,321 4,331 4,544 4,539 4,971 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 61,974 71,985 76,053 78,175 87,292 From Oil Wells.................................................. 8,451 9,816 10,371 8,256 10,546 Total................................................................... 70,424 81,802 86,424 86,431 97,838 Repressuring ...................................................... 1 0 0 2 5 Vented and Flared.............................................. 488 404 349 403 1,071 Wet After Lease Separation................................ 69,936 81,397 86,075 86,027 96,762

398

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

5 5 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 3,051 3,521 3,429 3,506 3,870 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 71,545 71,543 76,915 R 143,644 152,495 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 71,545 71,543 76,915 R 143,644 152,495 Repressuring ...................................................... NA NA NA 0 NA Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 71,545 71,543 76,915 R 143,644 152,495 Nonhydrocarbon Gases Removed

399

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

5 5 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 33,948 35,217 35,873 37,100 38,574 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 1,484,269 1,484,856 1,432,966 1,391,916 1,397,934 From Oil Wells.................................................. 229,437 227,534 222,940 224,263 246,804 Total................................................................... 1,713,706 1,712,390 1,655,906 1,616,179 1,644,738 Repressuring ...................................................... 15,280 20,009 20,977 9,817 8,674 Vented and Flared.............................................. 3,130 3,256 2,849 2,347 3,525 Wet After Lease Separation................................

400

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

7 7 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 5,775 5,913 6,496 5,878 5,781 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 17,741 27,632 36,637 35,943 45,963 From Oil Wells.................................................. 16 155 179 194 87 Total................................................................... 17,757 27,787 36,816 36,137 46,050 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 17,757 27,787 36,816 36,137 46,050 Nonhydrocarbon Gases Removed

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

9 9 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 4,000 4,825 6,755 7,606 3,460 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 156,333 150,972 147,734 157,039 176,221 From Oil Wells.................................................. 15,524 16,263 14,388 12,915 11,088 Total................................................................... 171,857 167,235 162,122 169,953 187,310 Repressuring ...................................................... 8 0 0 0 0 Vented and Flared.............................................. 206 431 251 354 241 Wet After Lease Separation................................ 171,642 166,804

402

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

1 1 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 4,178 4,601 3,005 3,220 3,657 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 244,826 264,809 260,554 254,488 259,432 From Oil Wells.................................................. 36,290 36,612 32,509 29,871 31,153 Total................................................................... 281,117 301,422 293,063 284,359 290,586 Repressuring ...................................................... 563 575 2,150 1,785 1,337 Vented and Flared.............................................. 1,941 1,847 955 705 688 Wet After Lease Separation................................

403

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

7 7 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 7,068 7,425 7,700 8,600 8,500 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 241,776 224,560 224,112 194,121 212,276 From Oil Wells.................................................. 60,444 56,140 56,028 48,530 53,069 Total................................................................... 302,220 280,700 280,140 242,651 265,345 Repressuring ...................................................... 2,340 2,340 2,340 2,340 2,340 Vented and Flared.............................................. 3,324 3,324 3,324 3,324 3,324 Wet After Lease Separation................................

404

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

7 7 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 13,487 14,370 14,367 12,900 13,920 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 81,545 81,723 88,259 87,608 94,259 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 81,545 81,723 88,259 87,608 94,259 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 81,545 81,723 88,259 87,608 94,259 Nonhydrocarbon Gases Removed

405

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

3 3 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 33,897 33,917 34,593 33,828 33,828 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 98,551 97,272 97,154 87,993 85,018 From Oil Wells.................................................. 6,574 2,835 6,004 5,647 5,458 Total................................................................... 105,125 100,107 103,158 93,641 90,476 Repressuring ...................................................... NA NA NA 0 NA Vented and Flared.............................................. NA NA NA 0 NA Wet After Lease Separation................................ 105,125 100,107 103,158

406

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

9 9 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 42,475 42,000 45,000 46,203 47,117 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 264,139 191,889 190,249 187,723 197,217 From Oil Wells.................................................. 0 0 0 0 0 Total................................................................... 264,139 191,889 190,249 187,723 197,217 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 0 0 0 0 0 Wet After Lease Separation................................ 264,139 191,889 190,249 187,723 197,217 Nonhydrocarbon Gases Removed

407

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

3 3 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 9,907 13,978 15,608 18,154 20,244 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 1,188,657 1,467,331 1,572,728 1,652,504 1,736,136 From Oil Wells.................................................. 137,385 167,656 174,748 183,612 192,904 Total................................................................... 1,326,042 1,634,987 1,747,476 1,836,115 1,929,040 Repressuring ...................................................... 50,216 114,407 129,598 131,125 164,164 Vented and Flared.............................................. 9,945 7,462 12,356 16,685 16,848

408

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

5 5 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 71 68 69 61 61 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 648 563 531 550 531 From Oil Wells.................................................. 10,032 10,751 9,894 11,055 11,238 Total................................................................... 10,680 11,313 10,424 11,605 11,768 Repressuring ...................................................... 0 0 0 0 0 Vented and Flared.............................................. 1,806 2,043 1,880 2,100 2,135 Wet After Lease Separation................................ 8,875 9,271 8,545 9,504 9,633 Nonhydrocarbon Gases Removed

409

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

9 9 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 60,577 63,704 65,779 68,572 72,237 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 5,859,358 4,897,366 4,828,188 4,947,589 5,074,067 From Oil Wells.................................................. 999,624 855,081 832,816 843,735 659,851 Total................................................................... 6,858,983 5,752,446 5,661,005 5,791,324 5,733,918 Repressuring ...................................................... 138,372 195,150 212,638 237,723 284,491 Vented and Flared.............................................. 32,010 26,823 27,379 23,781 26,947

410

Number of Gas and Gas Condensate Wells  

Gasoline and Diesel Fuel Update (EIA)

9 9 2000 2001 2002 2003 2004 Number of Gas and Gas Condensate Wells Producing at End of Year ................................... 15,700 16,350 17,100 16,939 20,734 Production (million cubic feet) Gross Withdrawals From Gas Wells................................................ 4,260,529 1,398,981 1,282,137 1,283,513 1,293,204 From Oil Wells.................................................. 895,425 125,693 100,324 94,615 88,209 Total................................................................... 5,155,954 1,524,673 1,382,461 1,378,128 1,381,413 Repressuring ...................................................... 42,557 10,838 9,754 18,446 19,031 Vented and Flared.............................................. 20,266 11,750 10,957 9,283 5,015 Wet After Lease Separation................................

411

GRR/Section 15-CO-a - Air Permit - Construction Permit | Open Energy  

Open Energy Info (EERE)

5-CO-a - Air Permit - Construction Permit 5-CO-a - Air Permit - Construction Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-CO-a - Air Permit - Construction Permit 15COAAirPermitConstructionPermit.pdf Click to View Fullscreen Contact Agencies Colorado Department of Public Health and Environment Regulations & Policies 5 CCR 1001-5 Colorado Stationary Source Permitting and Air Pollution Control Emission Notice Requirements Triggers None specified Click "Edit With Form" above to add content 15COAAirPermitConstructionPermit.pdf 15COAAirPermitConstructionPermit.pdf 15COAAirPermitConstructionPermit.pdf Error creating thumbnail: Page number not in range. Flowchart Narrative The Colorado Department of Public Health and Environment (CDPHE) Air

412

Buildings Energy Data Book: 1.3 Value of Construction and Research  

Buildings Energy Data Book (EERE)

9 9 Number of Construction Employees and Total Employees for Select Building Equipment Industries (Thousand Employees) Electrical Contractors and Other Wiring Installation Contractors (NAICS 238210) -Total Employment -Construction/Extraction Occupations -Construction/Extraction % of Total Plumbing, Heating, and Air-Conditioning Contractors (NAICS 238220) -Total Employment -Construction/Extraction Occupations -Construction/Extraction % of Total Other Building Equipment Contractors (NAICS 238290) -Total Employment -Construction/Extraction Occupations -Construction/Extraction % of Total Source(s): Bureau of Labor Statistics, Occupational Employment and Wage Estimates: 2002 OES Estimates for 2002 Data, November 2004 OES Estimates for 2004 Data, May 2006 Estimates for 2006 Data, May 2008 Estimates for 2008 Data, May 2010 Estimates for 2010 Data. Available at

413

Step 4. Inspect the Building During and After Construction | Building  

NLE Websites -- All DOE Office Websites (Extended Search)

4. Inspect the Building During and After Construction 4. Inspect the Building During and After Construction A number of website resources offer checklists to help officials organize the many energy-code-related areas to inspect on the construction site. Several examples of different checklists are listed below. When applicable and approved for use, REScheck and COMcheck inspection checklists should be provided as part of the energy code compliance documentation for the building. REScheck/COMcheck checklists. The REScheck and COMcheck software programs generate reports that list the energy-code-related items to be inspected. The lists include mandatory items such as air leakage control, duct insulation and sealing, temperature controls, and lighting requirements, and can be used by officials to assist during on-site

414

Proceedings: 1989 Fossil Power Plant construction conference  

SciTech Connect

EPRI's First International Conference on Fossil Plant Construction was held in Cincinnati, Ohio on August 29--31, 1989. The Conference was attended by approximately 140 people representing 35 utilities, many US architect engineering companies, equipment suppliers and independent power producers. The conference covered world wide developments in fossil plant construction. Included in these proceedings are papers from the following sessions: The Challenge of Demands for New Capacity and Construction; Recent Plant Construction Experience; Construction Experience for New Technologies; Cogeneration Project Experience; Regulatory Requirements for Fossil Plant Construction; Planning, Development and Design; Modular Construction Techniques; Applications of Advanced Computer Technologies; International and Domestic Construction Advances; Management Challenges of Fossil Projects; and Retrofit and Repowering Construction Experience. Individual projects are processed separately for the data bases.

Armor, A.F.; Divakaruni, S.M. (eds.)

1991-07-01T23:59:59.000Z

415

Handbook of energy use for building construction  

Science Conference Proceedings (OSTI)

The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, ralroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. The handbook focuses on new building construction; however, some information for the other parts of the construction industry is also included. The handbook provides building designers with information to determine the energy required for buildings construction and evaluates the energy required for alternative materials, assemblies, and methods. The handbook is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

Stein, R.G.; Stein, C.; Buckley, M.; Green, M.

1980-03-01T23:59:59.000Z

416

RL-721 Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 I. Project Title: Washington River Protection Solutions & Advanced Technologies & Laboratories International- Proposed Actions For CY 2012 Scheduled To Take Place Under CX B3.6, "Small-Scale Research and Development, Laboratory Operations, and Pilot Projects" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions· e.g., acres displaced/disturbed, excavation length/depth, etc.): Washington River Protection Solutions LLC (WRPS) & Advanced Technologies & Laboratories International Inc. (ATL) will perform indoor bench-scale & small-scale research & development projects, conventional laboratory operations, & pilot projects to verify proof- of-concept, on & near the Hanford Site during Calendar Year 2012. WRPS & ATL will perform

417

RL-721 Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 61 I. Project Title: Washington River Protection Solutions LLC - Proposed Actions For CY 2012 Scheduled To Take Place Under CX B2.5, "Facility Safety and Environmental Improvements" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, etc.): Washington River Protection Solutions LLC (WRPS) will perform safety and environmental improvements of a facility, including the replacement/upgrade of facility components on & near the Hanford Site during Calendar Year 2012. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart 0, & CX B2.5. WRPS' facilities include all those identified in

418

RL-721 Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 I. Project Title: Washington River Protection Solutions LLC - Proposed Actions For CY 2012 Scheduled To Take Place Under CX B1. 22, "Relocation of Buildings" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, etc.): Washington River Protection Solutions LLC (WRPS) will relocate buildings on & near the Hanford Site during Calendar Year 2012. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & CX B1. 22. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.13 and J.14. Activities would include, but are not

419

Low Mach Number Fluctuating Hydrodynamics of Diffusively Mixing Fluids  

E-Print Network (OSTI)

We formulate low Mach number fluctuating hydrodynamic equations appropriate for modeling diffusive mixing in isothermal mixtures of fluids with different density and transport coefficients. These equations eliminate the fast isentropic fluctuations in pressure associated with the propagation of sound waves by replacing the equation of state with a local thermodynamic constraint. We demonstrate that the low Mach number model preserves the spatio-temporal spectrum of the slower diffusive fluctuations. We develop a strictly conservative finite-volume spatial discretization of the low Mach number fluctuating equations in both two and three dimensions. We construct several explicit Runge-Kutta temporal integrators that strictly maintain the equation of state constraint. The resulting spatio-temporal discretization is second-order accurate deterministically and maintains fluctuation-dissipation balance in the linearized stochastic equations. We apply our algorithms to model the development of giant concentration fl...

Donev, A; Sun, Y; Fai, T; Garcia, A L; Bell, J B

2012-01-01T23:59:59.000Z

420

Estimation of ship construction costs  

E-Print Network (OSTI)

Since the end of the Cold War naval procurement for the US Navy has seen a dramatic decrease. This decrease in defense spending has placed existing programs under more scrutiny than previous years. As a result there is ...

Miroyannis, Aristides

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Nuclear power plant construction activity 1987  

SciTech Connect

This annual report published by the Energy Information Administration (EIA) presents data on nuclear power plant construction activity. The previous report, Nuclear Power Plant Construction Activity 1986, included data for units that, as of December 31, 1986, were (1) in the construction pipeline, (2) canceled, or (3) commercial operation as of December 31, 1986. The data in this report, which were collected on Form EIA-254, ''Semiannual Report on Status of Reactor Construction,'' update the data in the previous report to be current as of December 31, 1987. Three types of information are included: plant characteristics and ownership; construction costs; and construction schedules and milestone dates.

1988-06-09T23:59:59.000Z

422

Roseville Electric - Residential New Construction Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Construction Rebate Program New Construction Rebate Program Roseville Electric - Residential New Construction Rebate Program < Back Eligibility Commercial Construction Installer/Contractor Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Construction Design & Remodeling Sealing Your Home Ventilation Solar Buying & Making Electricity Program Info State California Program Type Utility Rebate Program Rebate Amount Energy Efficiency: $500/unit Solar PV: $2/watt Shade Trees: $30/tree Provider Roseville Electric Roseville Electric provides financial incentives to encourage local builders to construct energy efficient homes which incorporate solar resources. Participating builders can choose to build Preferred Homes or

423

See Behind the Numbers at WSU Tri-Cities  

Science Conference Proceedings (OSTI)

The enrollment numbers for WSU were released this week. The enrollment at the Tri-Cities campus remained flat, but these numbers do not tell the full story of WSU Tri-Cities and the many things we have to celebrate about our local campus. WSU Tri-Cities has gone through significant growth and change over the past several years and has fostered closer ties to its alumni, the community, region and state.

Fisher, Brad; Kluse, Michael; Novich, Carolynn M.

2011-09-18T23:59:59.000Z

424

Group theoretical construction of extended baryon operators in lattice QCD  

SciTech Connect

The design and implementation of large sets of spatially-extended, gauge-invariant operators for use in determining the spectrum of baryons in lattice QCD computations are described. Group theoretical projections onto the irreducible representations of the symmetry group of a cubic spatial lattice are used in all isospin channels. The operators are constructed to maximize overlaps with the low-lying states of interest, while minimizing the number of sources needed in computing the required quark propagators. Issues related to the identification of the spin quantum numbers of the states in the continuum limit are addressed.

Subhasish Basak; Robert Edwards; George Fleming; Urs Heller; Colin Morningstar; David Richards; Ikuro Sato; Stephen Wallace

2005-06-01T23:59:59.000Z

425

Photon Sciences Directorate | 2010 Annual Report | Year In Review  

NLE Websites -- All DOE Office Websites (Extended Search)

Year In Review The NSLS-II construction site transformed from a field of dirt to a fully formed steel ring half a mile in circumference, a new education program introduced a...

426

Architects' perspectives on construction waste reduction by design  

SciTech Connect

The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.

Osmani, M. [Department of Civil and Building Engineering, Loughborough University, Loughborough, Leicestershire LE11 3TU (United Kingdom)], E-mail: M.Osmani@lboro.ac.uk; Glass, J.; Price, A.D.F. [Department of Civil and Building Engineering, Loughborough University, Loughborough, Leicestershire LE11 3TU (United Kingdom)

2008-07-01T23:59:59.000Z

427

Construction design as a process for flow : applying lean principles to construction design  

E-Print Network (OSTI)

Delays and cost overruns are the rule rather than the exception in the construction industry. Design changes due to lack of constructability late in the construction phase generating costly ripple effect which create delay ...

Soto, Leticia, S.M. Massachusetts Institute of Technology

2007-01-01T23:59:59.000Z

428

CONSTRUCTION MANAGEMENT QUALIFICATION STANDARD REFERENCE GUIDE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Construction Management Qualification Standard Reference Guide August 2009 This page is intentionally blank. Table of Contents i LIST OF FIGURES ..................................................................................................................... iv LIST OF TABLES ........................................................................................................................ v ACRONYMS ................................................................................................................................ vi PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

429

Sustainable construction in Mexican housing markets  

E-Print Network (OSTI)

This thesis examines recent developments in Mexico's housing markets as an example of how sustainable construction is being adapted and applied in developing countries. The recognition that the construction, operation, and ...

Jung, Bomee

2007-01-01T23:59:59.000Z

430

Application of Embedded System in Construction Machinery  

Science Conference Proceedings (OSTI)

Developed especially for the specific requirements and standards of construction and automotive industries for vehicles and machines to work in the field, modern controller in construction machinery is usually made up of several different electric control ...

Ming-shan Liu; Yuan Zhou

2007-07-01T23:59:59.000Z

431

PVUSA construction and safety: Experience, lessons learned and costs  

DOE Green Energy (OSTI)

This report is the first of a series of PVUSA reports on PVUSA experiences and lessons learned at the demonstration sites in Davis and Kerman, California. During the course of approximately 6 years (1988--1993), nine PV systems have been installed ranging from 20 kW to 500 kW. Five 20-kW emerging module technology arrays were installed on universal project-provided structures, and four utility-scale systems (200 to 500 kW) were installed as turnkey (vendor designed and integrated) systems. The report emphasizes PVUSA construction and safety experience from the installation of these systems and is intended for use by utility personnel engaged in the construction of a photovoltaic (PV) power plant (e.g., engineers, construction supervisors, etc.).

Shipman, D.

1994-09-01T23:59:59.000Z

432

Alternative Fuels Data Center: Renewable Identification Numbers  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Renewable Renewable Identification Numbers to someone by E-mail Share Alternative Fuels Data Center: Renewable Identification Numbers on Facebook Tweet about Alternative Fuels Data Center: Renewable Identification Numbers on Twitter Bookmark Alternative Fuels Data Center: Renewable Identification Numbers on Google Bookmark Alternative Fuels Data Center: Renewable Identification Numbers on Delicious Rank Alternative Fuels Data Center: Renewable Identification Numbers on Digg Find More places to share Alternative Fuels Data Center: Renewable Identification Numbers on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Renewable Identification Numbers RIN Format EPA uses the following format to determine RINs for each physical gallon of

433

Why is hydrogen's atomic number 1?  

NLE Websites -- All DOE Office Websites (Extended Search)

the number of protons in an atom's nucleus. Hydrogen's atomic number is 1 because all hydrogen atoms contain exactly one proton. Author: Steve Gagnon, Science Education Specialist...

434

Reference Number PCR Kit Name Manufacturer Kit ...  

Science Conference Proceedings (OSTI)

Page 1. Reference Number PCR Kit Name Manufacturer Kit Description 1 Profiler Life Technologies AmpFlSTR® Profiler® (Part number 403038) ...

2013-11-20T23:59:59.000Z

435

Texas Number of Idle Refineries as of January 1 (Number of Elements)  

U.S. Energy Information Administration (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1980's: 17: 7: 7: 4: 6: 3: 4: 2: 1990's: 2: 2: 1: 1: 1: 1: NA: 1: NA: 1: 2000's: 0: 1: 1 ...

436

Ohio Number of Operable Refineries as of January 1 (Number of ...  

U.S. Energy Information Administration (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1980's: 6: 6: 6: 5: 5: 4: 4: 4: 1990's: 4: 4: 4: 4: 4: 4: NA: 4: NA: 4: 2000's: 4: 4: 4 ...

437

Colorado Number of Operable Refineries as of January 1 (Number of ...  

U.S. Energy Information Administration (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1980's: 3: 3: 3: 3: 2: 2: 2: 3: 1990's: 3: 3: 3: 3: 2: 2: NA: 2: NA: 2: 2000's: 2: 2: 2 ...

438

Puerto Rico Number of Idle Refineries as of January 1 (Number of ...  

U.S. Energy Information Administration (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1980's: 1: 1: 0: 0: 0: 0: 0: 0: 1990's: 0: 0: 1: 0: 0: 0: NA: 0: NA: 0: 2000's: 1: 3: 3 ...

439

Berkeley Lab Site Construction Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Old Town Demolition Old Town Demolition The demolition of Old Town Area Buildings 25A, 40, 41, 44, 44A, 44B, 52 and 52A has been completed to make way for the construction of the Solar Energy Research Center (SERC) and a General Purpose Laboratory (GPL). A phased plan has been developed to abate and demolish the remaining buildings within the Old Town Area, namely Buildings 4, 5, 7, 7C, 14, 16 and 16A. Subsurface remediation is subsequently planned to take place to address existing subsurface contamination. The demolition of the subject buildings is part of an overall plan to remediate and redevelop the Old Town area of the Lab. Critical Decision 1 (CD-1, Selection of Alternatives) was approved in October 2013 and $19.4M of funding has been approved for the characterization, deactivation, abatement, demolition and soil remediation

440

Smart Manufacturing, Construction, and Cyber-Physical ...  

Science Conference Proceedings (OSTI)

Strategic Goal:Smart Manufacturing, Construction, and Cyber-Physical Systems. Enable the next generation of innovative ...

2013-01-03T23:59:59.000Z

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Energy-conscious construction: Litigation insurance?  

SciTech Connect

Construction defects are annoying for homeowners, and can bring on litigation that can wipe out builders. The design and construction techniques adopted by energy efficiency-minded builders may be one method of insuring a project against defects and litigation. This article discusses what to do to prevent litigation in preconstruction, construction, and postconstruction, making the modern job site work, standards for energy efficient construction, and possibilities in the future.

Luhr, S.

1997-11-01T23:59:59.000Z

442

Recovery Act NIST Construction Grant Program  

Science Conference Proceedings (OSTI)

Recovery Act NIST Construction Grant Program. ... Fraud Prevention Training for Recipients; Fraud Indicators Pamphlet; Red Flags of Collusion ...

2011-08-17T23:59:59.000Z

443

Nuclear Regulatory Commission approves construction of ...  

U.S. Energy Information Administration (EIA)

Uranium fuel, nuclear reactors, generation, spent fuel. Total Energy. ... near Spring City, Tennessee after initial construction began in 1973. ...

444

Constructing a Cleaner Economy Info Graphic  

Energy.gov (U.S. Department of Energy (DOE))

An overview of the impact that the clean energy economy is having on the U.S. construction industry.

445

A Rank Approach to Equity Forecast Construction  

E-Print Network (OSTI)

that are fit for their purpose; for example, returningaggregate county and sector forecasts that are consistent by construction....

Satchell, Stephen E; Wright, Stephen M

2006-03-14T23:59:59.000Z

446

Thinking Like a Whole Building: A Whole Foods Market New Construction Case Study  

SciTech Connect

Whole Foods Market participates in the U.S. Department of Energy's Commercial Building Partnerships (CBP) to identify and develop cost-effective, readily deployed, replicable energy efficiency measures (EEMs) for commercial buildings. Whole Foods Market is working with the National Renewable Energy Laboratory (NREL) on a retrofit and a new construction CBP project. Whole Foods Market's CBP new construction project is a standalone store in Raleigh, North Carolina. Whole Foods Market examined the energy systems and the interactions between those systems in the design for the new Raleigh store. Based on this collaboration and preliminary energy modeling, Whole Foods Market and NREL identified a number of cost-effective EEMs that can be readily deployed in other Whole Foods Market stores and in other U.S. supermarkets. If the actual savings in the Raleigh store - which NREL will monitor and verify - match the modeling results, each year this store will save nearly $100,000 in operating costs (Raleigh's rates are about $0.06/kWh for electricity and $0.83/therm for natural gas). The store will also use 41% less energy than a Standard 90.1-compliant store and avoid about 3.7 million pounds of carbon dioxide emissions.

Deru, M.; Bonnema, E.; Doebber, I.; Hirsch, A.; McIntyre, M.; Scheib, J.

2011-04-01T23:59:59.000Z

447

Method of constructing an improved electrochemical cell  

DOE Patents (OSTI)

An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

Grimes, Patrick G. (Westfield, NJ); Einstein, Harry (Springfield, NJ)

1984-10-09T23:59:59.000Z

448

Data management for animation of construction processes  

Science Conference Proceedings (OSTI)

Animation of construction processes is a useful tool to understand the complexity of civil engineering projects. The basic idea of existing four-dimensional (4D) animation approaches is to establish a link between a construction task and the component ... Keywords: Animation, Construction processes, Process modelling, Visualization

Wolfgang Huhnt; Sven Richter; Steffen Wallner; Tarek Habashi; Torsten Krämer

2010-11-01T23:59:59.000Z

449

Table A1. U.S. Number of Vehicles, Vehicle-Miles, Motor Fuel ...  

U.S. Energy Information Administration (EIA)

Number of Vehicles Vehicle-Miles Traveled Motor Fuel Consumption Motor Fuel 2001 Household and Vehicle Expenditures ... Age of Primary Driver 16 to 17 Years ...

450

Using a Business Process Model as a Central Organizing Construct for an Undergraduate Weather Forecasting Course  

Science Conference Proceedings (OSTI)

For the last five years, the author has employed a business process model as a central organizing construct for the senior-level Forecasting Techniques course at Embry- Riddle Aeronautical University's Daytona Beach, Florida, campus. The process model ...

John M. Lanicci

2012-05-01T23:59:59.000Z

451

Number: 894 Description: How far is it ...  

Science Conference Proceedings (OSTI)

... Number: 1198 Description: When was Hiroshima bombed? ... 1264 Description: What is the atomic weight of ...

2002-04-29T23:59:59.000Z

452

Guide to Integrating Renewable Energy in Federal Construction: Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Construction to someone by E-mail Project Construction to someone by E-mail Share Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Facebook Tweet about Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Twitter Bookmark Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Google Bookmark Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Delicious Rank Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Digg Find More places to share Guide to Integrating Renewable Energy in Federal Construction: Project Construction on AddThis.com... Home Introduction Assessing Renewable Energy Options Planning, Programming, & Budgeting

453

New method for classifying construction information  

E-Print Network (OSTI)

Classification plays a vital role in construction specifications, structuring of construction documents, measuring bills of quantities, and calculation of construction costs. A multitude of classification systems exists in the global construction market with very little commonality among them. With continued globalization of the construction industry and the rapid development toward a computer integrated construction process based on computer-aided product data modeling, the need for a uniform general classification system is felt more than ever by the construction professionals. The purpose of this study is to analyze the major classification systems of construction works, such as MasterFormat or UniFormat used in the United States, and SfB, CI/SfB, or UniClass used in the European countries and elsewhere in the world, and to describe the adaptability of a new system for Relational Database Management System. Based on the results of study, an interactive database of new construction information classification system is constructed. This study will be useful as a foundation for an identification of construction works uniformly on a global basis.

Lee, Sunku

2001-01-01T23:59:59.000Z

454

Solving Truckload Procurement Auctions Over an Exponential Number of Bundles  

Science Conference Proceedings (OSTI)

Truckload carriers provide hundreds of billions of dollars worth of services to shippers in the United States alone each year. Internet auctions provide these shippers with a fast and easy way to negotiate potential contracts with a large number of carriers. ... Keywords: combinatorial auctions, implicit bidding approach, network flows, truckload procurement

Richard Li-Yang Chen; Shervin AhmadBeygi; Amy Cohn; Damian R. Beil; Amitabh Sinha

2009-11-01T23:59:59.000Z

455

Status of NIO1 construction  

SciTech Connect

The NIO1 (Negative Ion Optimization phase 1) project consists of a multiaperture negative ion source mounted on a 60 kV accelerating column; up to 9 beamlets (15 mA H{sup -} each one) arranged in 3x3 matrix with 14 mm spacing can be extracted. The moderate size and the modular concept make some relative rotation of the source magnetic filter and the electrodes possible, so that the effect of crossed and aligned field can be easily compared. Other goals of source experimental program are emittance (and beam profile) measurement at several distances (for simulation code validation), testing of diagnostic components and of radiofrequency coupling. A full set of construction drawing was completed; also the Fast Emittance Scanner (FES) and its vacuum chambers were built (four mounting positions are reserved to FES). Some low power rf matching boxes were developed for a test plasma, approximately half the source size. A cesium oven compatible with NIO1 is being also developed; by using some industrial standard 100 W heaters (with a proper driver) a careful control of temperature is planned.

Cavenago, M.; Fagotti, E.; Poggi, M. [INFN-LNL, v.le dell'Universita' 2, 35020 Legnaro (PD) (Italy); Serianni, G.; Antoni, V.; Bigi, M.; Fellin, F.; Gazza, E.; Recchia, M.; Veltri, P. [Consorzio RFX, Associazione Euratom-ENEA sulla fusione, c.so S. Uniti 4, 35127 Padova (Italy); Petrenko, S.; Kulevoy, T. [INFN-LNL, Legnaro, Italy and ITEP, B. Cheremushkinskaya 25, 117218 Moscow (Russian Federation)

2011-09-26T23:59:59.000Z

456

2009 Reporting Year  

U.S. Energy Information Administration (EIA)

FRS Accumu- Book Value Year End Year's Foot Line # Gross Lated DD&A Net Additions DD&A of Disposals Other Balance Additions Other note Petroleum: A BCD E F G H IJ

457

Nonlinear Grassmann Sigma Models in Any Dimension and An Infinite Number of Conserved Currents  

E-Print Network (OSTI)

We first consider nonlinear Grassmann sigma models in any dimension and next construct their submodels. For these models we construct an infinite number of nontrivial conserved currents. Our result is independent of time-space dimensions and, therfore, is a full generalization of that of authors (Alvarez, Ferreira and Guillen). Our result also suggests that our method may be applied to other nonlinear sigma models such as chiral models, $G/H$ sigma models in any dimension.

Kazuyuki Fujii; Yasushi Homma; Tatsuo Suzuki

1998-06-11T23:59:59.000Z

458

The Construction Information Gateway Stephen R Lockley, Construction Informatics, Newcastle University  

E-Print Network (OSTI)

are overcome. 1 Parand, F. (1996) The Construction Information Gateway Demonstrator, CIBSE Journal (see also

Amor, Robert

459

Probabilistic risk assessment for the construction phases of a bridge construction based on finite element analysis  

Science Conference Proceedings (OSTI)

To develop a design, engineering, and construction management information sharing system that allow the project participants to effectively share the information throughout the construction life cycle with the support of 3D, design and building information, ... Keywords: Construction phases, Finite element analysis, Improved response surface method, Risk assessment, Virtual construction

Taejun Cho; Tae Soo Kim

2008-04-01T23:59:59.000Z

460

Constructibility review process framework for transportation facilities  

E-Print Network (OSTI)

Constructibility is the optimum use of construction knowledge and experience in planning, design, procurement, and field operations in order to achieve overall project objectives ("Constructibility: a primer" 1986). This Thesis presents a framework for implementing constructibility to the transportation industry. The challenge of applying such a process to the transportation industry is the contracting strategy predominantly used: the design/bid/build strategy. In such a contracting environment construction is performed as a completely separate phase. Changes in key players occur once the project is awarded to the contractor. Contractors have little or no opportunity to provide input to planners and designers. The framework developed in this research consists of performing a series of constructibility functions during specific project development phases. Constructibility functions such as forming project teams, storing and retrieving constructibility lessons learned, and providing construction feedback to designers make the project development process more efficient. The computer technique used to build the Constructibility Review Process Framework is the IDEFO modeling technique. The technique is used for modeling functions in a process (decisions, actions, and activities) and the relationship between the functions (Mayer). The model was developed after a thorough investigation of the critical issues facing the state transportation agencies, and an understanding of the current environment these agencies operate in.

Liman, Majed

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Imagine Homes New Construction Occupied Test House  

SciTech Connect

This report summarizes the research findings of a long-term monitoring plan to evaluate the performance of an energy-efficient home constructed in 2010 in San Antonio, Texas. Monitoring of the energy use, energy generation, and temperature conditions for this project occurred between July 2010 and October 2011. The heating, ventilation, and air conditioning system effectively maintained acceptable temperatures and humidity levels in peak cooling and heating and non-peak operating periods. Discrepancies were found between modeled and actual energy use values, with actual space cooling energy use closest to the corresponding modeled value. Energy consumption predicted for lighting, appliances, and miscellaneous electrical loads was significantly higher than measured amounts, and energy consumption predicted for cooling was significantly lower than measured amounts. A high amount of the 1,600 kWh of PV-generated electricity produced annually was sent to the electric grid every month. The solar thermal DHW system was the main source of hot water for most of the year and performed well; during summer, electrical use by the backup system was rare.

Stecher, D.; Rapport, A.; Allison, K.

2013-07-01T23:59:59.000Z

462

ORISE: Report shows number of health physics degrees for 2010  

NLE Websites -- All DOE Office Websites (Extended Search)

report shows number of health physics degrees increased for report shows number of health physics degrees increased for graduates, decreased for undergraduates in 2010 Decreased number of B.S. degrees remains higher than levels in the early 2000 FOR IMMEDIATE RELEASE Dec. 20, 2011 FY12-09 OAK RIDGE, Tenn.-The number of health physics graduate degrees increased for both master's and doctoral candidates in 2010, but decreased for bachelor's degrees, says a report released this year by the Oak Ridge Institute for Science and Education. The ORISE report, Health Physics Enrollments and Degrees Survey, 2010 Data, surveyed 24 academic programs with enrollment and degree data and included students majoring in health physics or in an option program equivalent to a major, such as other health physics-based programs embedded in life

463

Constructive Methods of Invariant Manifolds for Kinetic Problems  

E-Print Network (OSTI)

We present the Constructive Methods of Invariant Manifolds for model reduction in physical and chemical kinetics, developed during last two decades. The problem of reduced description is studied as a problem of constructing the slow invariant manifold. The invariance conditions are formulated as the differential equation for a manifold immersed in the phase space (the invariance equation). The equation of motion for immersed manifolds is obtained (the film extension of the dynamics). Invariant manifolds are fixed points for this equation, and slow invariant manifolds are Lyapunov stable fixed points, thus slowness is presented as stability. A collection of methods for construction of slow invariant manifolds is presented, in particular the analogue of KAM methods for dissipative systems. We systematically consider a discrete analogue of the slow (stable) positively invariant manifolds for dissipative systems, invariant grids. The following examples of applications are presented: Nonperturbative deviation of physically consistent hydrodynamics from the Boltzmann equation and from the reversible dynamics, for Knudsen numbers ~ 1; construction of the moment equations for nonequilibrium media and their dynamical correction (instead of extension of list of variables) to gain more accuracy in description of highly nonequilibrium flows; invariant grids for chemical reactions; universal continuous media description of dilute polymeric solution, etc.

A. N. Gorban; I. V. Karlin; A. Yu. Zinovyev

2003-11-02T23:59:59.000Z

464

Consolidated Construction Consortium Ltd | Open Energy Information  

Open Energy Info (EERE)

Ltd Ltd Jump to: navigation, search Name Consolidated Construction Consortium Ltd Place Chennai - 600 004., Tamil Nadu, India Zip 600004 Sector Biomass, Solar Product Chennai-based construction and engineering firm. The firm is planning to foray into solar and biomass energy via its subsidiary CCCL Infrastructure. References Consolidated Construction Consortium Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Consolidated Construction Consortium Ltd is a company located in Chennai - 600 004., Tamil Nadu, India . References ↑ "Consolidated Construction Consortium Ltd" Retrieved from "http://en.openei.org/w/index.php?title=Consolidated_Construction_Consortium_Ltd&oldid=34386

465

Construction feasibility of OTEC platforms. Final report  

DOE Green Energy (OSTI)

This study provides an evaluation of the feasibility of constructing either steel or concrete OTEC platforms of both spar and ship shape configurations for a range of platform sizes with respect to existing, developed shipyard or fabrication yard facilities that are currently active in marine vessel construction within the US. This brief study is quite broad in scope. Many parameters, including plant size; vessel type, size, configuration, and dimensions; position of heat exchangers; existing construction facility size, geographic location, and potential for modification; and, availability of undeveloped deep water construction sites affect the conclusions drawn. Nevertheless, the conclusions should remain valid and not change significantly, unless there are major changes in either vessel size or US construction capabilities. The various concepts are ranked in order of their feasibility and practicality of construction in existing or modified existing facilities and new facilities.

Brewer, J H; Harwood, P; Solberg, K; Fjeld, S

1978-12-01T23:59:59.000Z

466

Fast library for number theory: an introduction  

Science Conference Proceedings (OSTI)

We discuss FLINT (Fast Library for Number Theory), a library to support computations in number theory, including highly optimised routines for polynomial arithmetic and linear algebra in exact rings.

William B. Hart

2010-09-01T23:59:59.000Z

467

,"New Mexico Number of Natural Gas Consumers"  

U.S. Energy Information Administration (EIA) Indexed Site

1: Residential" "Sourcekey","NA1501SNM8","NA1508SNM8","NA1509SNM8" "Date","New Mexico Natural Gas Number of Residential Consumers (Count)","New Mexico Natural Gas Number of...

468

Number: 1 Description: What powers did ...  

Science Conference Proceedings (OSTI)

... top> Number: 10 Description: What is one of the major problems with electronic producing turbines (windmills) in California? ...

2002-11-04T23:59:59.000Z

469

Number: 1 Description: How did the ...  

Science Conference Proceedings (OSTI)

... Number: 80 Description: What part did ITT (International Telephone and Telegraph) and Anaconda Copper play in the ...

2003-03-03T23:59:59.000Z

470

Wastewater Construction and Operation Permits (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

471

National Construction Safety Team Advisory Committee 2003 ...  

Science Conference Proceedings (OSTI)

... of NIST, to the Secretary of Commerce, to ... and Director, Center for Energy Research University ... Construction Safety Team Advisory Committee 2003 ...

2012-11-01T23:59:59.000Z

472

Metrics and Tools for Construction Productivity Project  

Science Conference Proceedings (OSTI)

... the construction of a new building, bridge, or power plant) or renovation ... industry researchers/academics, and Bureau of Labor Statistics (BLS) and ...

2011-11-16T23:59:59.000Z

473

Collaborative Unit Construction in Korean: Pivot Turns  

E-Print Network (OSTI)

A. (1996). Interactional units in conversation: Syntactic,M. (2000). The construction of units in conversational talk.character of grammatical units in conversation: Conditional

Ju, Hee

2011-01-01T23:59:59.000Z

474

Alternative Energy in New State Construction  

Energy.gov (U.S. Department of Energy (DOE))

Texas requires state government departments to compare the cost of providing energy alternatives for new and reconstructed state government buildings and for certain construction or repair to...

475

Hanford Waste Treatment and Immobilization Plant Construction...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

conducted an independent review of selected aspects of construction quality at the Hanford Waste Treatment and Immobilization Project (WTP). The review, which was performed May...

476

Low Mach Number Fluctuating Hydrodynamics of Diffusively Mixing Fluids  

E-Print Network (OSTI)

We formulate low Mach number fluctuating hydrodynamic equations appropriate for modeling diffusive mixing in isothermal mixtures of fluids with different density and transport coefficients. These equations eliminate the fast isentropic fluctuations in pressure associated with the propagation of sound waves by replacing the equation of state with a local thermodynamic constraint. We demonstrate that the low Mach number model preserves the spatio-temporal spectrum of the slower diffusive fluctuations. We develop a strictly conservative finite-volume spatial discretization of the low Mach number fluctuating equations in both two and three dimensions. We construct several explicit Runge-Kutta temporal integrators that strictly maintain the equation of state constraint. The resulting spatio-temporal discretization is second-order accurate deterministically and maintains fluctuation-dissipation balance in the linearized stochastic equations. We apply our algorithms to model the development of giant concentration fluctuations in the presence of concentration gradients, and investigate the validity of common simplifications neglecting the spatial non-homogeneity of density and transport properties. We perform simulations of diffusive mixing of two fluids of different densities in two dimensions and compare the results of low Mach number continuum simulations to hard-disk molecular dynamics simulations. Excellent agreement is observed between the particle and continuum simulations of giant fluctuations during time-dependent diffusive mixing.

A. Donev; A. J. Nonaka; Y. Sun; T. G. Fai; A. L. Garcia; J. B. Bell

2012-12-11T23:59:59.000Z

477

Buildings Energy Data Book: 1.3 Value of Construction and Research  

Buildings Energy Data Book (EERE)

2 2 Value of New Building Construction Relative to GDP, by Year ($2010 Billion) Value of New Construction Put in Place Bldgs. Percent of Residential Commercial (1) All Bldgs. (1) GDP Total U.S. GDP 1980 5.0% 1985 5.8% 1990 4.9% 1995 4.4% 2000 5.2% 2005 6.0% 2006 5.9% 2007 5.2% 2008 4.4% 2009 3.3% 2010 2.6% Note(s): Source(s): 129.8 247.7 377.4 14,660 1) New buildings construction differs from Table 1.3.2 by excluding industrial building construction. DOC, Current Construction Reports: Value of New Construction Put in Place, C30, Aug. 2003, Table 1 for 1980-1990; DOC, Annual Value of Private Construction Put in Place, August 2008 for 1995-2000; DOC, Annual Value of Private Construction Put in Place, February 2012 for 2002-2010; DOC, Annual Value of Public Construction Put in Place, August 2008 for 1995-2000; DOC, Annual Value of Public Construction Put in Place, February 2012 for 2002-2010;

478

Allocation Year Rollover  

NLE Websites -- All DOE Office Websites (Extended Search)

Allocation Year Rollover Allocation Year Rollover Allocation Year Rollover: 2013 to 2014 Note: Allocation Year 2013 (AY13) ends at 23:59:59 on Monday, January 13, 2014. AY14 runs from Tuesday, January 14, 2014 through Monday, January 12, 2015. Below are major changes that will go into effect with the beginning of AY14 on Tuesday, January 14, 2014. All times listed are PST. Scheduled System Downtimes There will be no service disruption during the allocation year rollover this year. Interactive and batch use will continue uninterrupted (except for "premium" jobs on Hopper; see below). Charging Across AY Boundary All batch jobs will continue running during the rollover. Time accrued before midnight will be charged to AY13 repos; time accrued after midnight will be charged to AY14 repos. Running batch jobs that are associated with

479

Utility Power Plant Construction (Indiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Power Plant Construction (Indiana) Utility Power Plant Construction (Indiana) Eligibility Construction InstallerContractor MunicipalPublic Utility Rural Electric...

480

Illinois Natural Gas Number of Underground Storage Depleted Fields ...  

U.S. Energy Information Administration (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1990's: 13: 2000's: 13: 13: 13: 12: 12: 11: 11: 11: 10: 10: 2010's: 11: 11-

Note: This page contains sample records for the topic "year constructed number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Michigan Natural Gas Number of Underground Storage Salt Caverns ...  

U.S. Energy Information Administration (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1990's: 2: 2000's: 2: 2: 2: 2: 2: 2: 2: 2: 2: 2: 2010's: 2: 2-

482

Illinois Natural Gas Number of Gas and Gas Condensate Wells ...  

U.S. Energy Information Administration (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1980's: 241: 1990's: 356: 373: 382: 385: 390: 372: 370: 372: 185: 300: 2000's: 280: 300 ...

483

GRR/Section 6-TX-b - Construction Storm Water Permitting Process | Open  

Open Energy Info (EERE)

6-TX-b - Construction Storm Water Permitting Process 6-TX-b - Construction Storm Water Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-TX-b - Construction Storm Water Permitting Process 06TXBConstructionStormWaterPermit.pdf Click to View Fullscreen Contact Agencies Texas Commission on Environmental Quality EPA Regulations & Policies TPDES Construction General Permit (TXR150000) 30 Texas Administrative Code 205 General Permits for Waste Discharges Texas Water Code 26.040 General Permits Clean Water Act Triggers None specified Click "Edit With Form" above to add content 06TXBConstructionStormWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

484

GRR/Section 6-CO-b - Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

6-CO-b - Construction Storm Water Permit 6-CO-b - Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-CO-b - Construction Storm Water Permit 06COBConstructionStormWaterPermit.pdf Click to View Fullscreen Contact Agencies Colorado Department of Public Health and Environment Regulations & Policies Colorado Water Quality Control Act 5 CCR 1002-61 Triggers None specified Click "Edit With Form" above to add content 06COBConstructionStormWaterPermit.pdf 06COBConstructionStormWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Projects in Colorado with storm water discharges from construction activities that disturb one or more acres of land may require a Colorado

485

Assessment of modular construction for safety-related structures at advanced nuclear power plants  

SciTech Connect

Modular construction techniques have been successfully used in a number of industries, both domestically and internationally. Recently, the use of structural modules has been proposed for advanced nuclear power plants. The objective in utilizing modular construction is to reduce the construction schedule, reduce construction costs, and improve the quality of construction. This report documents the results of a program which evaluated the proposed use of modular construction for safety-related structures in advanced nuclear power plant designs. The program included review of current modular construction technology, development of licensing review criteria for modular construction, and initial validation of currently available analytical techniques applied to concrete-filled steel structural modules. The program was conducted in three phases. The objective of the first phase was to identify the technical issues and the need for further study in order to support NRC licensing review activities. The two key findings were the need for supplementary review criteria to augment the Standard Review Plan and the need for verified design/analysis methodology for unique types of modules, such as the concrete-filled steel module. In the second phase of this program, Modular Construction Review Criteria were developed to provide guidance for licensing reviews. In the third phase, an analysis effort was conducted to determine if currently available finite element analysis techniques can be used to predict the response of concrete-filled steel modules.

Braverman, J.; Morante, R.; Hofmayer, C.

1997-03-01T23:59:59.000Z

486

Construction processes configuration using process patterns  

Science Conference Proceedings (OSTI)

Process modeling is used in construction to support various simulation tasks. A major problem is that due to the one-of-a-kind character of construction projects a lot of work is needed each time to manually develop a project overall process schedule. ... Keywords: Ontology, Process configuration, Process modeling, Process pattern, Rules

A. Benevolenskiy; K. Roos; P. Katranuschkov; R. J. Scherer

2012-10-01T23:59:59.000Z

487

San Luis Unit technical record of design and construction. Volume 5. Construction Dos Amigos Pumping Plant, Pleasant Valley Pumping Plant. Central Valley Project, West San Joaquin Division, San Luis Unit, California. A water resources technical publication. Final report  

SciTech Connect

The technical record of design and construction of the San Luis unit is divided into seven volumes. This volume, number V, deals with the construction of two specific features of the San Luis unit, Dos Amigos Pumping Plant and Pleasant Valley Pumping Plant.

1974-09-01T23:59:59.000Z

488

Construction Documents (100%) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Documents (100%) Construction Documents (100%) Construction Documents (100%) October 16, 2013 - 4:38pm Addthis Construction documents (100%) represent the final set of drawings that will be issued for contractors to bid on. At this point, all architectural and engineering systems have been reviewed and designed to ensure that project goals are being met. A final review with all members participating in previous reviews should be planned to ensure all information from previous design reviews have been incorporated into the construction documents and all other renewable energy integration issues have been resolved before being issued for bid. At this point, it is expected there will be few, if any, changes to the overall building design. The planned renewable energy technologies will

489

GC GUIDANCE ON MINOR CONSTRUCTION THRESHOLDS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GUIDANCE GUIDANCE ON MINOR CONSTRUCTION THRESHOLDS We have been asked about how the Department implements what is known as the "minor construction threshold," which limits the amount of certain funds that can be spent on minor construction projects that are not specifically authorized by law. This Guidance is intended to clarify both the applicable law and Department policy. The Secretary's authority to carry out construction projects is subject to several limitations in the Atomic Energy Defense Act (AEDA) on the use of funds appropriated for DOE national security programs. One of these limitations, the "minor construction threshold," caps the amount of "operation and maintenance funds" or "facilities and "infrastructure funds authorized by a DOE

490

Ruihua Construction Corporation RHC | Open Energy Information  

Open Energy Info (EERE)

Ruihua Construction Corporation RHC Ruihua Construction Corporation RHC Jump to: navigation, search Name Ruihua Construction Corporation (RHC) Place Shenzhen, Guangdong Province, China Zip 518040 Sector Solar Product A construction company whose solar subsidiary Resun Solar is constructing a building-integrated PV (BIPV) installation for the Olympics. Coordinates 22.546789°, 114.112556° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":22.546789,"lon":114.112556,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

491

Amchitka Former Workers, Construction Worker Screening Projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amchitka Former Workers, Construction Worker Screening Projects Amchitka Former Workers, Construction Worker Screening Projects Amchitka Former Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Amchitka Worker Population Served: All workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied

492

Communities of Web service registries: Construction and management  

Science Conference Proceedings (OSTI)

The last few years have seen a democratization in the use of Internet technologies, mainly Web services, for electronic B2B transactions. This has triggered an increase in the number of companies' Web service registries. In this paper, we propose to ... Keywords: Communities of registries, Managing communities of registries, Organization of Web service registries, Service oriented computing

Mohamed Sellami; Olfa Bouchaala; Walid Gaaloul; Samir Tata

2013-03-01T23:59:59.000Z

493

THE MAXIMUM NUMBER OF EMPTY CONGRUENT TRIANGLES DETERMINED BY A POINT SET  

E-Print Network (OSTI)

Let ¡ be a set of ¢ points in the plane and consider a family of (nondegenerate) pairwise congruent triangles whose vertices belong to ¡. While the number of such triangles can grow superlinearly in ¢ — as it happens in lattice sections of the integer grid — it has been conjectured by Brass that the number of pairwise congruent empty triangles is only at most linear. We disprove this conjecture by constructing point sets with£¥¤¦¢¨§?©???¢? ? empty congruent triangles.

Adrian Dumitrescu; János Pach; Géza Tóth

2005-01-01T23:59:59.000Z

494

GRR/Section 6-OR-b - Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

b - Construction Storm Water Permit b - Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-OR-b - Construction Storm Water Permit 06ORBConstructionStormWaterPermit.pdf Click to View Fullscreen Contact Agencies Oregon Department of Environmental Quality Triggers None specified Click "Edit With Form" above to add content 06ORBConstructionStormWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A project may be eligible for "automatic coverage" under NPDES general permit 1200-CN if storm water does not discharge to a water body with a

495

GRR/Section 6-MT-b - Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

MT-b - Construction Storm Water Permit MT-b - Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-MT-b - Construction Storm Water Permit 06MTBConstructionStormWaterPermit (7).pdf Click to View Fullscreen Contact Agencies Montana Department of Environmental Quality Regulations & Policies Montana Code Annotated 75-5 [ARM 17.30.1101] Triggers None specified Click "Edit With Form" above to add content 06MTBConstructionStormWaterPermit (7).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Montana regulates water quality under Montana Code Annotated 75-5. The

496

GRR/Section 6-NV-b - Construction Stormwater Permit | Open Energy  

Open Energy Info (EERE)

NV-b - Construction Stormwater Permit NV-b - Construction Stormwater Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-NV-b - Construction Stormwater Permit 06NVBConstructionStormWaterPermit (1).pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies Nevada Revised Statue 445A Nevada Administrative Code 445A.228 to 445A.272 Triggers None specified Click "Edit With Form" above to add content 06NVBConstructionStormWaterPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer who disturbs more than one acre and less than five acres must

497

GRR/Section 6-AK-b - Construction Storm Water Permitting | Open Energy  

Open Energy Info (EERE)

GRR/Section 6-AK-b - Construction Storm Water Permitting GRR/Section 6-AK-b - Construction Storm Water Permitting < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-AK-b - Construction Storm Water Permitting 06AKBConstructionStormWaterPermitting (1).pdf Click to View Fullscreen Contact Agencies Alaska Department of Environmental Conservation Regulations & Policies 18 AAC 72: Wastewater Treatment and Disposal Triggers None specified Click "Edit With Form" above to add content 06AKBConstructionStormWaterPermitting (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative From DEC Website: The goal of the Storm Water Program is to reduce or eliminate pollutants in

498

Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 7, 2011 June 7, 2011 Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility RICHLAND, Wash. - Construction of the largest ground- water treatment facility at the Hanford Site - a major American Recovery and Reinvestment Act project - is on schedule and more than 70 percent complete. Recovery Act workers with DOE contractor CH2M HILL Plateau Remediation Company are on pace to finish con- struction of the 200 West Groundwater Treatment Facil- ity this year. Funding for the project comes from the $1.6 billion the Richland Operations Office received from the Recovery Act. The 52,000-square-foot facility will pump contaminated water from the ground, remove contaminants with a combination of treatment technologies, and return clean water to the aquifer. The system will have the capacity to

499

APS team works smarter, cuts substation construction costs by 36%  

SciTech Connect

An aggressive, cost-cutting, team of T D employees at Arizona Public Service Co (APS) is building a new distribution substation in Phoenix for less than half the original cost that APS planners had calculated for the project's land, labor and materials. Scheduled for service in June of this year, APS analysts had originally projected land, labor and materials costs for the 20-MVA Bell substation at nearly $1.7-million-not including major equipment such as transformers, circuit breakers, and switches. However, after studying the project, an empowered APS crew was able to slash 36% off the original estimate-more than $610,000. What's more, APS spokesmen say that its new approach to substation construction and design has given its engineers and construction crews a laundry list of additional ideas to try out on future substation ventures. 4 figs., 1 tab.

Not Available

1993-05-01T23:59:59.000Z

500

Applied Science and Technology Task Order Fiscal Year 2009 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End...