Powered by Deep Web Technologies
Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Floorspace  

U.S. Energy Information Administration (EIA) Indexed Site

7. Heated, Cooled, and Lit Buildings, Floorspace for Non-Mall Buildings, 2003" 7. Heated, Cooled, and Lit Buildings, Floorspace for Non-Mall Buildings, 2003" ,"Total Floorspace (million square feet)" ,"Total Floorspace in All Buildings*","Heated Buildings",,"Cooled Buildings",,"Lit Buildings c" ,,"Total Floor- space a","Heated Floor- space b","Total Floor- space a","Cooled Floor- space b","Total Floor- space a","Lit Floor- space b" "All Buildings* ...............",64783,60028,53473,56940,41788,62060,51342 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6789,5668,4988,5007,4017,6038,4826 "5,001 to 10,000 ..............",6585,5786,5010,5408,3978,6090,4974

2

Floorspace  

U.S. Energy Information Administration (EIA) Indexed Site

A1. Summary Table for All Buildings (Including Malls), 2003" A1. Summary Table for All Buildings (Including Malls), 2003" ,"Number of Buildings (thousand)","Total Floorspace (million square feet)","Mean Square Feet per Building (thousand)","Median Square Feet per Building (thousand)" "All Buildings ................",4859,71658,14.7,5 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2586,6922,2.7,2.4 "5,001 to 10,000 ..............",948,7033,7.4,7.2 "10,001 to 25,000 .............",810,12659,15.6,15 "25,001 to 50,000 .............",261,9382,36,35 "50,001 to 100,000 ............",147,10291,70.2,67 "100,001 to 200,000 ...........",74,10217,138.6,130 "200,001 to 500,000 ...........",26,7494,287.6,260

3

1999 Commercial Buildings Characteristics--Year Constructed  

U.S. Energy Information Administration (EIA) Indexed Site

Year Constructed Year Constructed Year Constructed More than one-third (37 percent) of the floorspace in commercial buildings was constructed since 1980 and more than one-half (55 percent) after 1969 (Figure 1). Less than one-third of floorspace was constructed before 1960. Detailed tables Figure 1. Distribution of Floorspace by Year Constructed, 1999 Figure 1. Distribution of Floorspace by Year Constructed, 1999. If having trouble viewing this page, please contact the National Energy Information Center at (202) 586-8800. Energy Information Administration Commercial Buildings Energy Consumption Survey Overall, relatively more buildings than floorspace were represented in the older age categories and more floorspace than buildings in the newer categories (see graphical comparison) because older buildings were smaller than more recently constructed buildings (Figure 2). Buildings constructed prior to 1960 were 11,700 square feet in size on average while those constructed after 1959 were 37 percent larger at 16,000 square feet per building.

4

Buildings","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

B9. Year Constructed, Floorspace, 1999" B9. Year Constructed, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999" "All Buildings ................",67338,4034,6445,9127,10866,11840,13931,11094 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6774,655,798,1025,928,1056,1153,1159 "5,001 to 10,000 ..............",8238,791,776,1777,1165,1392,1150,1188 "10,001 to 25,000 .............",11153,972,1504,1488,1267,2045,2767,1110 "25,001 to 50,000 .............",9311,489,673,1343,1987,1587,1594,1638

5

Trends in Commercial Buildings--Buildings and Floorspace  

U.S. Energy Information Administration (EIA) Indexed Site

Home > Trends in Commercial Buildings > Home > Trends in Commercial Buildings > Trends in Buildings Floorspace Data tables Commercial Buildings Trend—Detail Commercial Floorspace Trend—Detail Background: Adjustment to data Trends in Buildings and Floorspace Each year buildings are added to and removed from the commercial buildings sector. Buildings are added by new construction or conversion of existing buildings from noncommercial to commercial activity. Buildings are removed by demolition or conversion from commercial to noncommercial activity. Number of Commercial Buildings In 1979, the Nonresidential Buildings Energy Consumption Survey estimated that there were 3.8 million commercial buildings in the United States; by 1992, the number increased 27 percent to 4.8 million (an average annual increase of 1.8%) (Figure 1). In 1995, the estimated number declined to 4.6 million buildings, but it is unlikely that there was an actual decline in the number of buildings. To understand the apparent decline, two factors should be considered—the change in the way that the target population of commercial buildings was defined in 1995 and the uncertainty of estimates from sample surveys:

6

"Table A7. Enclosed Floorspace and Conditioned Floorspace"  

U.S. Energy Information Administration (EIA) Indexed Site

Enclosed Floorspace and Conditioned Floorspace" Enclosed Floorspace and Conditioned Floorspace" " by Industry Group and Selected Industries, 1994" ,,"Approximate",,"Average" ,,"Enclosed",,"Enclosed"," Conditioned(c) Floorspace" ,,"Floorspace of All",,"Floorspace per"," of All Buildings Onsite",,"RSE" "SIC",,"Buildings Onsite","Establishments(b)","Establishment",,,"Row" "Code(a)","Industry Group and Industry","(million sq ft)","(counts)","(1000 sq ft)","(million sq ft)","(percents)","Factors" ,,"Total United States"

7

Table B8. Year Constructed, Number of Buildings, 1999  

U.S. Energy Information Administration (EIA) Indexed Site

B8. Year Constructed, Number of Buildings, 1999" B8. Year Constructed, Number of Buildings, 1999" ,"Number of Buildings (thousand)" ,"All Buildings","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999" "All Buildings ................",4657,419,499,763,665,774,846,690 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,227,270,359,321,367,413,390 "5,001 to 10,000 ..............",1110,107,102,240,166,193,156,145 "10,001 to 25,000 .............",708,63,90,97,84,130,179,65 "25,001 to 50,000 .............",257,13,20,39,53,44,43,44 "50,001 to 100,000 ............",145,7,9,19,24,26,33,27

8

Buildings*","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

B8. Year Constructed, Number of Buildings for Non-Mall Buildings, 2003" B8. Year Constructed, Number of Buildings for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)" ,"All Buildings*","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999","2000 to 2003" "All Buildings* ...............",4645,330,527,562,579,731,707,876,334 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2552,174,315,331,298,350,438,481,165 "5,001 to 10,000 ..............",889,71,107,90,120,180,98,158,66 "10,001 to 25,000 .............",738,55,64,90,95,122,103,151,58 "25,001 to 50,000 .............",241,19,23,26,33,48,32,39,21

9

Table B29. Percent of Floorspace Cooled, Number of Buildings and Floorspace, 199  

U.S. Energy Information Administration (EIA) Indexed Site

9. Percent of Floorspace Cooled, Number of Buildings and Floorspace, 1999" 9. Percent of Floorspace Cooled, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","Not Cooled","1 to 50 Percent Cooled","51 to 99 Percent Cooled","100 Percent Cooled","All Buildings","Not Cooled","1 to 50 Percent Cooled","51 to 99 Percent Cooled","100 Percent Cooled" "All Buildings ................",4657,1097,1012,751,1796,67338,8864,16846,16966,24662 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,668,352,294,1034,6774,1895,1084,838,2957 "5,001 to 10,000 ..............",1110,282,292,188,348,8238,2026,2233,1435,2544

10

Table B28. Percent of Floorspace Heated, Number of Buildings and Floorspace, 199  

U.S. Energy Information Administration (EIA) Indexed Site

8. Percent of Floorspace Heated, Number of Buildings and Floorspace, 1999" 8. Percent of Floorspace Heated, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","Not Heated","1 to 50 Percent Heated","51 to 99 Percent Heated","100 Percent Heated","All Buildings","Not Heated","1 to 50 Percent Heated","51 to 99 Percent Heated","100 Percent Heated" "All Buildings ................",4657,641,576,627,2813,67338,5736,7593,10745,43264 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,366,230,272,1479,6774,1091,707,750,4227 "5,001 to 10,000 ..............",1110,164,194,149,603,8238,1148,1504,1177,4409

11

Table B2. Summary Table: Totals and Medians of Floorspace, Number of Workers,  

U.S. Energy Information Administration (EIA) Indexed Site

. Summary Table: Totals and Medians of Floorspace, Number of Workers, Hours of Operation, and Age of Building, 1999" . Summary Table: Totals and Medians of Floorspace, Number of Workers, Hours of Operation, and Age of Building, 1999" ,"All Buildings (thousand)","Total Floorspace (million square feet)","Total Workers in All Buildings (thousand)","Median Square Feet per Building (thousand)","Median Square Feet per Worker","Median Hours per Week","Median Age of Buildings (years)" "All Buildings ................",4657,67338,81852,5,909,50,30.5 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,6774,11125,2.5,667,50,30.5 "5,001 to 10,000 ..............",1110,8238,10968,7,1000,50,34.5 "10,001 to 25,000 .............",708,11153,11378,15,1354,55,28.5

12

Level: National Data; Row: NAICS Codes; Column: Floorspace and Buildings;  

Gasoline and Diesel Fuel Update (EIA)

9.1 Enclosed Floorspace and Number of Establishment Buildings, 2010; 9.1 Enclosed Floorspace and Number of Establishment Buildings, 2010; Level: National Data; Row: NAICS Codes; Column: Floorspace and Buildings; Unit: Floorspace Square Footage and Building Counts. Approximate Approximate Average Enclosed Floorspace Average Number Number of All Buildings Enclosed Floorspace of All Buildings of Buildings Onsite NAICS Onsite Establishments(b) per Establishment Onsite per Establishment Code(a) Subsector and Industry (million sq ft) (counts) (sq ft) (counts) (counts) Total United States 311 Food 1,115 13,271 107,293.7 32,953 3.1 3112 Grain and Oilseed Milling 126 602 443,178.6 5,207 24.8 311221 Wet Corn Milling 14 59 270,262.7 982 18.3 31131 Sugar Manufacturing

13

Table B15. Number of Establishments in Building, Floorspace, 1999  

U.S. Energy Information Administration (EIA) Indexed Site

5. Number of Establishments in Building, Floorspace, 1999" 5. Number of Establishments in Building, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","Number of Establishments in Building" ,,"One","Two to Five","Six to Ten","Eleven to Twenty","More than Twenty","Currently Unoccupied" "All Buildings ................",67338,43343,10582,3574,3260,4811,1769 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6774,5358,857,"Q","Q","Q",512 "5,001 to 10,000 ..............",8238,5952,1630,137,"Q","Q","Q" "10,001 to 25,000 .............",11153,7812,1982,784,"Q","Q",296

14

Types of Lighting in Commercial Buildings - Building Size and Year  

U.S. Energy Information Administration (EIA) Indexed Site

Lighting and Building Size and Year Constructed Lighting and Building Size and Year Constructed Building Size Smaller commercial buildings are much more numerous than larger commercial buildings, but comprise less total floorspace-the 1,001 to 5,000 square feet category includes more than half of total buildings, but just 11 percent of total floorspace. In contrast, just 5 percent of buildings are larger than 50,000 square feet, but they account for half of total floorspace. Lighting consumes 38 percent of total site electricity. Larger buildings consume relatively more electricity for lighting than smaller buildings. Nearly half (47%) of electricity is consumed by lighting in the largest buildings (larger than 500,000 square feet). In the smallest buildings (1,001 to 5,000 square feet), one-fourth of electricity goes to lighting

15

Table B30. Percent of Floorspace Lit When Open, Number of Buildings and Floorspa  

U.S. Energy Information Administration (EIA) Indexed Site

0. Percent of Floorspace Lit When Open, Number of Buildings and Floorspace, 1999" 0. Percent of Floorspace Lit When Open, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","Not Lita","1 to 50 Percent Lit","51 to 99 Percent Lit","100 Percent Lit","All Buildings","Not Lita","1 to 50 Percent Lit","51 to 99 Percent Lit","100 Percent Lit" "All Buildings ................",4657,498,835,1228,2096,67338,3253,9187,20665,34233 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,323,351,517,1156,6774,915,1061,1499,3299 "5,001 to 10,000 ..............",1110,114,279,351,367,8238,818,2014,2614,2793

16

Table B36. Refrigeration Equipment, Number of Buildings and Floorspace, 1999  

U.S. Energy Information Administration (EIA) Indexed Site

6. Refrigeration Equipment, Number of Buildings and Floorspace, 1999" 6. Refrigeration Equipment, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Refrigeration Equipment","Type of Equipment (more than one may apply)",,,"All Buildings","All Buildings with Refrigeration Equipment","Type of Equipment (more than one may apply)" ,,,"Walk-In","Open Cases or Cabinets","Closed Cases or Cabinets",,,"Walk-In","Open Cases or Cabinets","Closed Cases or Cabinets" "All Buildings ................",4657,950,658,255,719,67338,25652,19713,8808,19938 "Building Floorspace"

17

Table B16. Multibuilding Facilities, Number of Buildings and Floorspace, 1999  

U.S. Energy Information Administration (EIA) Indexed Site

6. Multibuilding Facilities, Number of Buildings and Floorspace, 1999" 6. Multibuilding Facilities, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,"Total Floorspace (million square feet)" ,"All Buildings","Buildings on Multibuilding Facilities",,"All Buildings","Buildings on Multibuilding Facilities" ,,"All Buildings","With Central Physical Plant",,"All Buildings","With Central Physical Plant" "All Buildings ................",4657,1362,142,67338,26049,7101 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,604,"Q",6774,1706,"Q" "5,001 to 10,000 ..............",1110,297,"Q",8238,2211,"Q"

18

"Table HC1.2.3 Living Space Characteristics by Average Floorspace--"  

U.S. Energy Information Administration (EIA) Indexed Site

3 Living Space Characteristics by Average Floorspace--" 3 Living Space Characteristics by Average Floorspace--" " Single-Family Housing Units and Mobile Homes, 2005" ,,"Single- Family and Mobile Homes (millions)","Average Square Feet per Housing Unit" ," Housing Units (millions)" ,,,"Single-Family Detached",,,"Single-Family Attached",,,"Mobile Homes" "Housing Unit Characteristics",,,"Total1","Heated","Cooled","Total1","Heated","Cooled","Total1","Heated","Cooled" "Total",111.1,86.6,2522,1970,1310,1812,1475,821,1055,944,554 "Total Floorspace (Square Feet)" "Fewer than 500",3.2,0.9,261,336,162,"Q","Q","Q",334,260,"Q"

19

"Table B11. Employment Size Category, Floorspace, 1999"  

U.S. Energy Information Administration (EIA) Indexed Site

1. Employment Size Category, Floorspace, 1999" 1. Employment Size Category, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","Number of Workers" ,,"Fewer than 5 Workers","5 to 9 Workers","10 to 19 Workers","20 to 49 Workers","50 to 99 Workers","100 to 249 Workers","250 or More Workers" "All Buildings ................",67338,14321,6325,8028,10814,8898,8356,10595 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6774,4230,1502,791,235,"Q","Q","N" "5,001 to 10,000 ..............",8238,3748,1331,1792,1174,"Q","Q","N" "10,001 to 25,000 .............",11153,3922,1557,2263,2510,819,"Q","Q"

20

"Table B21. Space-Heating Energy Sources, Floorspace, 1999"  

U.S. Energy Information Administration (EIA) Indexed Site

1. Space-Heating Energy Sources, Floorspace, 1999" 1. Space-Heating Energy Sources, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Space Heating","Space-Heating Energy Sources Used (more than one may apply)" ,,,"Electricity","Natural Gas","Fuel Oil","District Heat","Propane","Othera" "All Buildings ................",67338,61612,32291,37902,5611,5534,2728,945 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6774,5684,2651,3250,598,"Q",469,"Q" "5,001 to 10,000 ..............",8238,7090,2808,4613,573,"Q",688,"Q" "10,001 to 25,000 .............",11153,9865,5079,6069,773,307,682,"Q"

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

"Table B16. Employment Size Category, Floorspace for Non-Mall Buildings, 2003"  

U.S. Energy Information Administration (EIA) Indexed Site

6. Employment Size Category, Floorspace for Non-Mall Buildings, 2003" 6. Employment Size Category, Floorspace for Non-Mall Buildings, 2003" ,"Total Floorspace (million square feet)" ,"All Buildings*","Number of Workers" ,,"Fewer than 5 Workers","5 to 9 Workers","10 to 19 Workers","20 to 49 Workers","50 to 99 Workers","100 to 249 Workers","250 or More Workers" "All Buildings* ...............",64783,15492,6166,7803,10989,7934,6871,9528 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6789,4659,1264,689,155,"Q","Q","N" "5,001 to 10,000 ..............",6585,3323,1373,1109,689,"Q","Q","N" "10,001 to 25,000 .............",11535,4006,2075,2456,2113,692,"Q","N"

22

Table B1. Summary Table: Totals and Means of Floorspace, Number of Workers, and  

U.S. Energy Information Administration (EIA) Indexed Site

. Summary Table: Totals and Means of Floorspace, Number of Workers, and Hours of Operation, 1999" . Summary Table: Totals and Means of Floorspace, Number of Workers, and Hours of Operation, 1999" ,"All Buildings (thousand)","Total Floorspace (million square feet)","Total Workers in All Buildings (thousand)","Mean Square Feet per Building (thousand)","Mean Square Feet per Worker","Mean Hours per Week" "All Buildings ................",4657,67338,81852,14.5,823,60 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,6774,11125,2.9,609,57 "5,001 to 10,000 ..............",1110,8238,10968,7.4,751,53 "10,001 to 25,000 .............",708,11153,11378,15.7,980,65 "25,001 to 50,000 .............",257,9311,9243,36.2,1007,78

23

"Table B26. Water-Heating Energy Sources, Floorspace, 1999"  

U.S. Energy Information Administration (EIA) Indexed Site

6. Water-Heating Energy Sources, Floorspace, 1999" 6. Water-Heating Energy Sources, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Water Heating","Water-Heating Energy Sources Used (more than one may apply)" ,,,"Electricity","Natural Gas","Fuel Oil","District Heat","Propane" "All Buildings ................",67338,56115,24171,29196,2218,4182,1371 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6774,4280,2307,1719,"Q","Q","Q" "5,001 to 10,000 ..............",8238,5748,2287,3204,"Q","Q","Q" "10,001 to 25,000 .............",11153,9000,4220,4221,224,164,493

24

Table B3. Census Region, Number of Buildings and Floorspace, 1999  

U.S. Energy Information Administration (EIA) Indexed Site

. Census Region, Number of Buildings and Floorspace, 1999" . Census Region, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","North- east","Midwest ","South","West","All Buildings","North- east","Midwest","South","West" "All Buildings ................",4657,686,1188,1762,1021,67338,12360,16761,23485,14731 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,305,620,916,506,6774,901,1835,2536,1503 "5,001 to 10,000 ..............",1110,169,273,413,255,8238,1302,2045,3058,1834 "10,001 to 25,000 .............",708,130,188,260,130,11153,1954,2881,4194,2124

25

"Table B25. Energy End Uses, Floorspace for Non-Mall Buildings, 2003"  

U.S. Energy Information Administration (EIA) Indexed Site

5. Energy End Uses, Floorspace for Non-Mall Buildings, 2003" 5. Energy End Uses, Floorspace for Non-Mall Buildings, 2003" ,"Total Floorspace (million square feet)" ,"All Buildings*","Energy Used For (more than one may apply)" ,,"Space Heating","Cooling","Water Heating","Cooking","Manu- facturing" "All Buildings* ...............",64783,60028,56940,56478,22237,3138 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6789,5668,5007,4759,997,"Q" "5,001 to 10,000 ..............",6585,5786,5408,5348,1136,214 "10,001 to 25,000 .............",11535,10387,9922,9562,1954,472 "25,001 to 50,000 .............",8668,8060,7776,7734,2511,"Q"

26

"Table B23. Primary Space-Heating Energy Sources, Floorspace, 1999"  

U.S. Energy Information Administration (EIA) Indexed Site

3. Primary Space-Heating Energy Sources, Floorspace, 1999" 3. Primary Space-Heating Energy Sources, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Space Heating","Primary Space-Heating Energy Source Useda" ,,,"Electricity","Natural Gas","Fuel Oil","District Heat" "All Buildings ................",67338,61602,17627,32729,3719,5077 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6774,5684,1567,3080,482,"Q" "5,001 to 10,000 ..............",8238,7090,1496,4292,557,"Q" "10,001 to 25,000 .............",11153,9865,3035,5320,597,232 "25,001 to 50,000 .............",9311,8565,2866,4416,486,577

27

Property:Building/YearConstruction2 | Open Energy Information  

Open Energy Info (EERE)

YearConstruction2 YearConstruction2 Jump to: navigation, search This is a property of type Date. Year of construction 2 (Year of construction) Pages using the property "Building/YearConstruction2" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 1921 + Sweden Building 05K0002 + 1999 + Sweden Building 05K0003 + 1960 + Sweden Building 05K0004 + 1914 + Sweden Building 05K0005 + 1940 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1900 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 1777 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1850 + Sweden Building 05K0014 + 1650 + Sweden Building 05K0015 + 1878 + Sweden Building 05K0016 + 1700 +

28

Table HC1.2.2 Living Space Characteristics by Average Floorspace  

U.S. Energy Information Administration (EIA) Indexed Site

2 Living Space Characteristics by Average Floorspace, " 2 Living Space Characteristics by Average Floorspace, " " Per Housing Unit and Per Household Member, 2005" ,,"Average Square Feet" ," Housing Units (millions)" ,,"Per Housing Unit",,,"Per Household Member" "Living Space Characteristics",,"Total1","Heated","Cooled","Total1","Heated","Cooled" "Total",111.1,2033,1618,1031,791,630,401 "Total Floorspace (Square Feet)" "Fewer than 500",3.2,357,336,113,188,177,59 "500 to 999",23.8,733,667,308,343,312,144 "1,000 to 1,499",20.8,1157,1086,625,435,409,235 "1,500 to 1,999",15.4,1592,1441,906,595,539,339 "2,000 to 2,499",12.2,2052,1733,1072,765,646,400

29

Table HC1.2.4 Living Space Characteristics by Average Floorspace--Apartments, 2  

U.S. Energy Information Administration (EIA) Indexed Site

2.4 Living Space Characteristics by Average Floorspace--Apartments, 2005" 2.4 Living Space Characteristics by Average Floorspace--Apartments, 2005" ,,,"Average Square Feet per Apartment in a --" ," Housing Units (millions)" ,,,"2 to 4 Unit Building",,,"5 or More Unit Building" ,,"Apartments (millions)" "Living Space Characteristics",,,"Total","Heated","Cooled","Total","Heated","Cooled" "Total",111.1,24.5,1090,902,341,872,780,441 "Total Floorspace (Square Feet)" "Fewer than 500",3.1,2.3,403,360,165,366,348,93 "500 to 999",22.2,14.4,763,660,277,730,646,303 "1,000 to 1,499",19.1,5.8,1223,1130,496,1187,1086,696 "1,500 to 1,999",14.4,1,1700,1422,412,1698,1544,1348

30

Property:Building/YearConstruction1 | Open Energy Information  

Open Energy Info (EERE)

YearConstruction1 YearConstruction1 Jump to: navigation, search This is a property of type Date. Year of construction 1 (taxation year) Subproperties This property has the following 1 subproperty: S Sweden Building 05K0004 Pages using the property "Building/YearConstruction1" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 2003 + Sweden Building 05K0002 + 27 June 2013 21:11:42 + Sweden Building 05K0003 + 27 June 2013 21:10:49 + Sweden Building 05K0005 + 27 June 2013 21:11:38 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1972 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 2004 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1992 +

31

Property:Building/YearConstruction | Open Energy Information  

Open Energy Info (EERE)

YearConstruction YearConstruction Jump to: navigation, search This is a property of type Date. Year of construction Pages using the property "Building/YearConstruction" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 2003 + Sweden Building 05K0002 + 1999 + Sweden Building 05K0003 + 1960 + Sweden Building 05K0004 + 1914 + Sweden Building 05K0005 + 1940 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1900 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 1777 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1850 + Sweden Building 05K0014 + 1650 + Sweden Building 05K0015 + 1878 + Sweden Building 05K0016 + 1700 + Sweden Building 05K0017 + 1987 +

32

Z-Tiles: Building Blocks for Modular, Pressure-Sensing Floorspaces  

E-Print Network [OSTI]

Z-Tiles: Building Blocks for Modular, Pressure-Sensing Floorspaces Bruce Richardson, Krispin Leydon, University of Limerick, Limerick, Ireland {bruce.richardson | krispin.leydon | mikael.fernstrom}@ul.ie Joseph acting parallel to the z axis. Copyright is held by the author/owner(s). CHI 2004, April 24-29, 2004

33

Table HC1.1.4 Housing Unit Characteristics by Average Floorspace--Apartments, 2  

U.S. Energy Information Administration (EIA) Indexed Site

4 Housing Unit Characteristics by Average Floorspace--Apartments, 2005" 4 Housing Unit Characteristics by Average Floorspace--Apartments, 2005" ,,,"Average Square Feet per Apartment in a --" ," Housing Units (millions)" ,,,"2 to 4 Unit Building",,,"5 or More Unit Building" ,,"Apartments (millions)" "Housing Unit Characteristics",,,"Total","Heated","Cooled","Total","Heated","Cooled" "Total",111.1,24.5,1090,902,341,872,780,441 "Census Region and Division" "Northeast",20.6,6.7,1247,1032,"Q",811,788,147 "New England",5.5,1.9,1365,1127,"Q",814,748,107 "Middle Atlantic",15.1,4.8,1182,978,"Q",810,800,159 "Midwest",25.6,4.6,1349,1133,506,895,810,346

34

"Table B27. Space Heating Energy Sources, Floorspace for Non-Mall Buildings, 2003"  

U.S. Energy Information Administration (EIA) Indexed Site

7. Space Heating Energy Sources, Floorspace for Non-Mall Buildings, 2003" 7. Space Heating Energy Sources, Floorspace for Non-Mall Buildings, 2003" ,"Total Floorspace (million square feet)" ,"All Buildings*","Buildings with Space Heating","Space-Heating Energy Sources Used (more than one may apply)" ,,,"Elec- tricity","Natural Gas","Fuel Oil","District Heat","Propane","Other a" "All Buildings* ...............",64783,60028,28600,36959,5988,5198,3204,842 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6789,5668,2367,2829,557,"Q",665,183 "5,001 to 10,000 ..............",6585,5786,2560,3358,626,"Q",529,"Q" "10,001 to 25,000 .............",11535,10387,4872,6407,730,289,597,"Q"

35

"Table B32. Water-Heating Energy Sources, Floorspace for Non-Mall Buildings, 2003"  

U.S. Energy Information Administration (EIA) Indexed Site

2. Water-Heating Energy Sources, Floorspace for Non-Mall Buildings, 2003" 2. Water-Heating Energy Sources, Floorspace for Non-Mall Buildings, 2003" ,"Total Floorspace (million square feet)" ,"All Buildings*","Buildings with Water Heating","Water-Heating Energy Sources Used (more than one may apply)" ,,,"Elec- tricity","Natural Gas","Fuel Oil","District Heat","Propane" "All Buildings* ...............",64783,56478,27490,28820,1880,3088,1422 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6789,4759,2847,1699,116,"N",169 "5,001 to 10,000 ..............",6585,5348,2821,2296,"Q","Q",205 "10,001 to 25,000 .............",11535,9562,4809,4470,265,"Q",430

36

"Table B29. Primary Space-Heating Energy Sources, Total Floorspace for Non-Mall Buildings, 2003"  

U.S. Energy Information Administration (EIA) Indexed Site

9. Primary Space-Heating Energy Sources, Total Floorspace for Non-Mall Buildings, 2003" 9. Primary Space-Heating Energy Sources, Total Floorspace for Non-Mall Buildings, 2003" ,"Total Floorspace (million square feet)" ,"All Buildings*","Buildings with Space Heating","Primary Space-Heating Energy Source Used a" ,,,"Electricity","Natural Gas","Fuel Oil","District Heat" "All Buildings* ...............",64783,60028,15996,32970,3818,4907 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6789,5668,1779,2672,484,"Q" "5,001 to 10,000 ..............",6585,5786,1686,3068,428,"Q" "10,001 to 25,000 .............",11535,10387,3366,5807,536,"Q" "25,001 to 50,000 .............",8668,8060,2264,4974,300,325

37

"Table HC1.3 Heated Floorspace Usage Indicators, 2005" " Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

3 Heated Floorspace Usage Indicators, 2005" 3 Heated Floorspace Usage Indicators, 2005" " Million U.S. Housing Units" ,,"Heated Floorspace (square feet)" ,"Housing Units (millions)" ,,"Fewer than 500","500 to 999","1,000 to 1,499","1,500 to 1,999","2,000 to 2,499","2,500 to 2,999","3,000 or More" "Usage Indicators" "Total",111.1,6.1,27.7,26,17.6,10,"7 7.8",11.6 "No Main Space Heating Equipment",1.2,"N","N","N","N","N","N","N" "Have Main Space Heating Equipment",109.8,6.1,27.7,26,17.6,10,"7 7.8",11.6 "Use Main Space Heating Equipment",109.1,6.1,27.7,26,17.6,10,"7 7.8",11.6

38

"Table HC1.4 Cooled Floorspace Usage Indicators, 2005" " Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

4 Cooled Floorspace Usage Indicators, 2005" 4 Cooled Floorspace Usage Indicators, 2005" " Million U.S. Housing Units" ,,"Cooled Floorspace (square feet)" ,"Housing Units (millions)" ,,"Fewer than 500","500 to 999","1,000 to 1,499","1,500 to 1,999","2,000 to 2,499","2,500 to 2,999","3,000 or More" "Usage Indicators" "Total",111.1,49.2,15.1,15.6,11.1,7,5.2,8 "Have Cooling Equipment",93.3,31.3,15.1,15.6,11.1,7,5.2,8 "Use Cooling Equipment",91.4,30.4,14.6,15.4,11.1,6.9,5.2,7.9 "Have Equipment But Do Not Use it",1.9,1,0.5,"Q","Q","Q","Q","Q" "Do Not Have Cooling Equipment",17.8,17.8,"N","N","N","N","N","N"

39

Table HC1-2a. Housing Unit Characteristics by Year of Construction,  

U.S. Energy Information Administration (EIA) Indexed Site

2a. Housing Unit Characteristics by Year of Construction, 2a. Housing Unit Characteristics by Year of Construction, Million U.S. Households, 2001 Housing Unit Characteristics RSE Column Factor: Total Year of Construction RSE Row Factors 1990 to 2001 1 1980 to 1989 1970 to 1979 1960 to 1969 1950 to 1959 1949 or Before 0.5 1.6 1.2 1.0 1.1 1.1 0.8 Total ............................................... 107.0 15.5 18.2 18.8 13.8 14.2 26.6 4.3 Census Region and Division Northeast ...................................... 20.3 1.5 2.4 2.1 2.8 3.0 8.5 8.8 New England .............................. 5.4 0.4 0.7 0.4 0.8 0.9 2.3 11.3 Middle Atlantic ............................ 14.8 1.1 1.7 1.7 2.0 2.2 6.2 11.2 Midwest ......................................... 24.5 2.8 3.7 3.6 2.9 3.5 8.1 10.2 East North Central ...................... 17.1 2.0 2.5 2.5 2.0 2.6 5.5 11.9

40

Energy Information Administration - Commercial Energy Consumption...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

2A. Natural Gas Consumption and Conditional Energy Intensity by Year Constructed for All Buildings, 2003 Total Natural Gas Consumption (billion cubic feet) Total Floorspace of...

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Energy Information Administration - Commercial Energy Consumption...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Table C22. Electricity Consumption and Conditional Energy Intensity by Year Constructed for Non-Mall Buildings, 2003 Total Electricity Consumption (billion kWh) Total Floorspace...

42

Energy Information Administration - Commercial Energy Consumption...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

2A. Electricity Consumption and Conditional Energy Intensity by Year Constructed for All Buildings, 2003 Total Electricity Consumption (billion kWh) Total Floorspace of Buildings...

43

Energy Information Administration - Commercial Energy Consumption...  

Gasoline and Diesel Fuel Update (EIA)

A. Consumption and Gross Energy Intensity by Year Constructed for Sum of Major Fuels for All Buildings, 2003 Sum of Major Fuel Consumption (trillion Btu) Total Floorspace of...

44

Buildings*","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

"Food Service ...",1654,281,138,194,"Q",227,182,327,"Q" "Health Care ...",3163,"Q",203,445,395,754,522,578,185 " Inpatient...

45

YEAR  

National Nuclear Security Administration (NNSA)

96 YEAR 2013 Males 69 Females 27 YEAR 2013 SES 1 EJEK 9 EN 04 27 NN (Engineering) 26 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 3 YEAR 2013 American Indian Alaska Native Male...

46

NOAA Climate Data Prepares Oahu Construction Industry for Wet Season Each year NOAA's Climate Prediction Center, a part of the  

E-Print Network [OSTI]

and landfill. Without the headsup, not only PVT but Oahu's entire construction industry would have been hurt, with losses in the millions of dollars. As the only construction landfill on the island, more constructed storm water retention pond at the PVT landfill in Nanakuli, Oahu, Hawai'i Road to landfill

47

YEAR  

National Nuclear Security Administration (NNSA)

2540 YEAR 2013 Males 1677 Females 863 YEAR 2013 SES 102 EX 3 SL 1 EJEK 89 EN 05 41 EN 04 170 EN 03 18 NN (Engineering) 448 NQ (ProfTechAdmin) 1249 NU (TechAdmin Support) 76 NV...

48

YEAR  

National Nuclear Security Administration (NNSA)

1 1 YEAR 2011 Males 18 Females 23 YEAR 2011 SES 2 EJ/EK 2 NQ (Prof/Tech/Admin) 35 NU (Tech/Admin Support) 2 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 9 Asian Male 0 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 12 White Female 6 DIVERSITY Workforce Diversity Associate Administrator for Information Management & Chief Information Officer, NA-IM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 18 43.9% 23 56.1% Gender Males Females 4.9% 4.9% 85.4% 4.9% Pay Plan SES EJ/EK NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 2.4% 4.9% 7.3% 22.0% 0.0% 0.0% 4.9% 14.6% 29.3% 14.6% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

49

YEAR  

National Nuclear Security Administration (NNSA)

4 4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 31 NU (Tech/Admin Support) 5 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 10 White Male 13 White Female 10 DIVERSITY Workforce Diversity Office of General Counsel, NA-GC As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 21 47.7% 23 52.3% Gender Males Females 6.8% 2.3% 2.3% 6.8% 70.5% 11.4% Pay Plan SES EJ/EK EN 03 NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.0% 0.0% 2.3% 4.5% 2.3% 2.3% 13.6% 22.7% 29.5% 22.7% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

50

YEAR  

National Nuclear Security Administration (NNSA)

6 6 YEAR 2011 Males 7 Females 9 YEAR 2011 SES 1 NQ (Prof/Tech/Admin) 9 GS 15 2 GS 13 2 GS 12 1 GS 11 1 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 4 White Female 6 DIVERSITY Workforce Diversity Associate Administrator of External Affairs, NA-EA As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 7 43.8% 9 56.3% Gender Males Females 6.3% 56.3% 12.5% 12.5% 6.3% 6.3% Pay Plan SES NQ (Prof/Tech/Admin) GS 15 GS 13 GS 12 GS 11 0.0% 0.0% 6.3% 18.8% 6.3% 0.0% 6.3% 0.0% 25.0% 37.5% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male Hispanic Female White Male White Female FY11 Workforce Diversity

51

YEAR  

National Nuclear Security Administration (NNSA)

40 40 YEAR 2011 Males 68 Females 72 YEAR 2011 SES 5 EJ/EK 1 NN (Engineering) 16 NQ (Prof/Tech/Admin) 115 NU (Tech/Admin Support) 3 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 7 Asian Male 4 Asian Female 0 Hispanic Male 25 Hispanic Female 26 White Male 35 White Female 37 DIVERSITY Workforce Diversity Associate Administrator for Acquistion & Project Management, NA-APM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 68 48.6% 72 51.4% Gender Males Females 3.6% 0.7% 11.4% 82.1% 2.1% Pay Plan SES EJ/EK NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.7% 1.4% 2.1% 5.0% 2.9% 0.0% 17.9% 18.6% 25.0% 26.4% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male

52

Years  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Technology in and Technology in the National Interest 60 Years of Excellence Lawrence Livermore National Laboratory FY 2012 Annual Report About the Cover: Lawrence Livermore National Laboratory (LLNL) engineers Chris Spadaccini (left) and Eric Duoss are shown experimenting with direct ink-writing to create micro- to macroscale structures with extreme precision. The Laboratory is advancing this process and other additive manufacturing technologies to develop new materials with extraordinary properties for use in a wide range of national-security and other applications. About the Laboratory: Lawrence Livermore National Laboratory was founded in 1952 to enhance the security of the United States by advancing nuclear weapons science and technology. With a talented and dedicated workforce and

53

Energy Information Administration - Commercial Energy Consumption...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

. Consumption and Gross Energy Intensity by Year Constructed for Sum of Major Fuels for Non-Mall Buildings, 2003 Sum of Major Fuel Consumption (trillion Btu) Total Floorspace of...

54

Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2317&D2). Remedial actions performed in the Balance of Site (BOS) Laboratory Area of EU Z2-33 and two small areas in EU Z2-42 are described in Sects. 5 through 10 of this Phased Construction Completion Report (PCCR). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for EU Z2-33; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe RAs performed in the EU Z2-33 BOS Laboratory Area and two small areas in EU Z2-42. Approximately 18 acres in EU Z2-33 are addressed in this PCCR. Based on the results of the DVS evaluation and RAs performed, all 18 acres are recommended for unrestricted industrial use to 10 ft bgs. Three Federal Facility Agreement sites are addressed and recommended for no further action within this acreage, including: (1) K-1004-L Recirculating Cooling Water Lines Leak Sites; (2) K-1044 Heavy Equipment Repair Shop; and (3) K-1015-A Laundry Pit. Remedial actions for EU Z2-33 were developed in response to DVS characterization results described in the EU Z2-33 Technical Memorandum (Appendix A) and to support reindustrialization of the East Tennessee Technology Park as a commercial industrial park. Remediation criteria were designed for the protection of a future industrial worker who normally would not have the potential for exposure to soil below 10ft bgs. Accordingly, the Zone 2 ROD required land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likel

Bechtel Jacobs

2008-09-11T23:59:59.000Z

55

Fiscal Year 2009 Phased Construction Completion Report for EU Z2-36 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The purpose of this Phased Construction Completion Report (PCCR) is to present fiscal year (FY) 2009 results of Dynamic Verification Strategy (DVS) characterization activities for exposure unit (EU) Z2-36 in Zone 2 at the East Tennessee technology Park (ETTP). The ETTP is located in the northwest corner of the US Department of Energy (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee and encompasses approximately 5000 acres that have been subdivided into three zones--Zone 1 ({approx} 1400 acres), Zone 2 ({approx} 800 acres), and the Boundary Area ({approx} 2800 acres). Zone 2 comprises the highly industrial portion of ETTP and consists of all formerly secured areas of the facility, including the large processing buildings and direct support facilities; experimental laboratories and chemical and materials handling facilities; materials storage and waste disposal facilities; secure document records libraries; and shipping and receiving warehouses. The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005) (Zone 2 ROD) specifies the future end use for Zone 2 acreage as uncontrolled industrial for the upper 10 ft of soils. Characterization activities in these areas were conducted in compliance with the Zone 2 ROD and the DVS and data quality objectives (DQOs) presented in the Main Plant Group DQO Scoping Package (July 2006) and the Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2007a) (Zone 2 RDR/RAWP). The purpose of this PCCR is to address the following: (1) Document EU Z2-36 DVS characterization results; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs, and (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results. The Zone 2 ROD divided the area into 7 geographic areas and 44 EUs. To facilitate DQOs of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DqO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed, and characterization was conducted as EUs became accessible. As the opportunity to complete characterization became available, the planned DVS program was completed in FY 2009 for EU Z2-36.

Bechtel Jacobs

2009-02-10T23:59:59.000Z

56

Constructive physics  

E-Print Network [OSTI]

Discussion of the necessity to use the constructive mathematics as the formalism of quantum theory for systems with many particles.

Yuri Ozhigov

2008-05-19T23:59:59.000Z

57

New Construction  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Showerheads Residential Weatherization Performance Tested Comfort Systems Ductless Heat Pumps New Construction Residential Marketing Toolkit Retail Sales Allocation Tool...

58

Environmental Assessment for the Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan  

Broader source: Energy.gov (indexed) [DOE]

4 4 Environmental Assessment Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan at the Thomas Jefferson National Accelerator Facility Newport News, Virginia January 2007 U. S. Department of Energy Thomas Jefferson Site Office Newport News, VA DOE/EA-1534 January 2007 C:\TRANSFER\JANUARY 26 Final EA-1534-012607 (2).doc i TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... 1 1.0 INTRODUCTION ...........................................................................................11 1.1 PREVIOUS ACTIONS....................................................................................11 1.2 SCOPE OF THIS PROPOSED ACTION .......................................................11

59

1999 Commercial Buildings Characteristics--Trends in Commercial Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Trends in Commercial Buildings and Floorspace Trends in Commercial Buildings and Floorspace Trends in Commercial Buildings and Floorspace The addition of commercial buildings and floorspace from 1995 to 1999 continued the general trends noted since 1979 (Figures 1 and 2). The size of the commercial buildings has grown steadily over the twenty years of CBECS. Each year more buildings are added to the sector (new construction or conversion of pre-existing buildings to commercial activity) than are removed (demolition or conversion to non-commercial activity). The definition for the commercial buildings population was changed for the 1995 CBECS which resulted in a slightly smaller buildings population and accounts for the data break in both Figures 1 and 2 (see report "Trends in the Commercial Buildings Sector" for complete details). Figure 1. Total Commercial Buildings, 1979 to 1999

60

Fiscal Year 2010 Phased Construction Completion Report for EU Z2-32 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORJO 1-2161 &D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORIO 1 -2224&D3) (RDRJRAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone I exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together, which allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was completed for the EU addressed in this document (EU Z2-32). The purpose of this Phased Construction Completion Report (PCCR) is to address the following: (1) Document DVS characterization results for EU Z2-32. (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs. (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results. (4) Describe the remedial action performed in the K-1066-G Yard in EU Z2-32. Approximately 18.4 acres are included in the EU addressed in this PCCR. Based on results of the DVS evaluation, all 18.4 acres are recommended for unrestricted industrial use to 10 ft bgs. There are no Federal Facility Agreement Sites included in Appendix A of the Zone 2 ROD in EU Z2-32. The Zone 2 ROD requires land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-32 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a high probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-32. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18.4 acres addressed in this PCCR were assigned a high probability for consideration of release for unrestricted land use. This document contains the main text (Sects. 1 through 13) and one appendix. The main text addresses the purpose for this PCCR as described above. Additional supporting detail (e.g., field work and data summaries, graphics) is provided in the EU Z2-32 technical memorandum (Appendix A). Historical and DVS analytical data used in this PCCR are provided on a compact disc accompanying this document and can be accessed through the Oak Ridge Environmental Information System.

Bechtel Jacobs

2010-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Construction Machinery  

Science Journals Connector (OSTI)

...Even today many people employed in construction associate the use of robots with the manufacturing industry, mainly the automotive ... , where they are typically employed to spray paint and spot weld the car b...

Eugeniusz Budny Prof.; Miros?aw Ch?osta Dr.

2009-01-01T23:59:59.000Z

62

Trends in Commercial Buildings--Buildings and Floorspace  

U.S. Energy Information Administration (EIA) Indexed Site

activity. Number of Commercial Buildings In 1979, the Nonresidential Buildings Energy Consumption Survey estimated that there were 3.8 million commercial buildings in the...

63

1Construction Engineering Building Emphasis  

E-Print Network [OSTI]

1Construction Engineering Building Emphasis 2013-2014 Catalog 125 Total Credits First Year Semester 1 Semester 2 R Engr 101 (Engr Orientation) 2 CE 170 (Engineering Graphics) 3 CE 160 (Engr Problems Credits First Year Semester 1 Semester 2 R Engr 101 (Engr Orientation) 2 CE 170 (Engineering Graphics) 3

Lin, Zhiqun

64

CBECS Buildings Characteristics --Revised Tables  

U.S. Energy Information Administration (EIA) Indexed Site

Structure Tables Structure Tables (16 pages, 93 kb) CONTENTS PAGES Table 8. Building Size, Number of Buildings, 1995 Table 9. Building Size, Floorspace, 1995 Table 10. Year Constructed, Number of Buildings, 1995 Table 11. Year Constructed, Floorspace, 1995 These data are from the 1995 Commercial Buildings Energy Consumption Survey (CBECS), a national probability sample survey of commercial buildings sponsored by the Energy Information Administration, that provides information on the use of energy in commercial buildings in the United States. The 1995 CBECS was the sixth survey in a series begun in 1979. The data were collected from a sample of 6,639 buildings representing 4.6 million commercial buildings and 58.8 billion square feet of commercial floorspace in the U.S. The 1995 data are available for the four Census

65

Career Map: Construction Worker  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Construction Worker positions.

66

Konrad Repository Facing its Construction  

SciTech Connect (OSTI)

According to the German Atomic Energy Act the Federation is responsible for the construction and operation of installations for the safekeeping and disposal of radioactive waste. This duty was assigned to the Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz - BfS). In 1982, the Federal Institute of Physics and Metrology (Physikalisch Technische Bundesanstalt - PTB) as the precursor of BfS applied for a license for the disposal of radioactive waste with negligible heat generation in the Konrad iron ore mine near Salzgitter at the Ministry for Environment of Lower Saxony. After 25 years of plan approval procedure and subsequent lawsuits the license is now valid and Konrad is waiting for construction. Facing this challenge BfS has established a project team to supervise the in-house and external activities to be done. It is intended to construct the Konrad repository within a preparation period of two years and a subsequent erection phase of four years. Thus, Konrad is planned to come into operation in 2013. In this paper the development of the plan approval procedure, the technical design of the planned repository, especially with regard to safety-related aspects, and the planning for the construction will be discussed. (authors)

Kunze, V. [Bundesamt fur Strahlenschutz (BfS), Salzgitter (Germany)

2008-07-01T23:59:59.000Z

67

 

U.S. Energy Information Administration (EIA) Indexed Site

B9. Year Constructed, Floorspace for Non-Mall Buildings, 2003 B9. Year Constructed, Floorspace for Non-Mall Buildings, 2003 Total Floorspace (million square feet) All Buildings* Year Constructed 1919 or Before 1920 to 1945 1946 to 1959 1960 to 1969 1970 to 1979 1980 to 1989 1990 to 1999 2000 to 2003 All Buildings* ............................... 64,783 3,769 6,871 7,045 8,101 10,772 10,332 12,360 5,533 Building Floorspace (Square Feet) 1,001 to 5,000 ................................ 6,789 490 796 860 690 966 1,149 1,324 515 5,001 to 10,000 .............................. 6,585 502 827 643 865 1,332 721 1,209 486 10,001 to 25,000 ............................ 11,535 804 988 1,421 1,460 1,869 1,647 2,388 958 25,001 to 50,000 ............................ 8,668 677 838 935 1,234 1,720 1,174 1,352 739

68

A Framework to Explore Energy Saving Measures During Construction Phase  

Science Journals Connector (OSTI)

There has been a significant increase in interest and research in energy efficient buildings in recent years. In the ... construction. To make the construction phase less energy intensive, the contractor has to p...

Abdol R. Chini; Sandeep Shrivastava

2014-01-01T23:59:59.000Z

69

Architecture Engineering Construction (AEC)  

E-Print Network [OSTI]

Architecture Engineering Construction (AEC) Presented to FM Staff February 25, 2009 Updated March 1, 2010 #12;University of Maryland Baltimore Director Architecture, Engineering and Construction Vacant Administration & Finance Kathleen M. Byington #12;Division of Facilities Management Architecture, Engineering

Weber, David J.

70

Wanzek Construction | Open Energy Information  

Open Energy Info (EERE)

Wanzek Construction Wanzek Construction Jump to: navigation, search Logo: Wanzek Construction Name Wanzek Construction Address 2028 2nd Avenue NW Place West Fargo, ND Zip 58078 Country United States Sector Geothermal energy, Renewable Energy, Solar, Wind energy Product Turnkey Construction Services Stock Symbol MTZ Year founded 1971 Number of employees 1100 Company Type For Profit Company Ownership Public Small Business No Minority Business Yes Affiliated Companies MasTec N.A; MasTec Renewables; Phone number 2816064172 Website http://www.wanzek.com Coordinates 29.78577°, -95.66735° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.78577,"lon":-95.66735,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

71

Project Construction | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Construction Project Construction Project Construction October 16, 2013 - 5:14pm Addthis Building Design Project Construction Commisioning Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule. Construction Team

72

Feasibility, benefits and challenges of modular construction in high rise development in the United States : a developer's perspective  

E-Print Network [OSTI]

Modular construction has long been utilized in the construction of residential and many other commercial product types as a means for potentially quicker construction delivery times. Over the past 5 years this construction ...

Velamati, Sri

2012-01-01T23:59:59.000Z

73

Historical pipeline construction cost analysis  

Science Journals Connector (OSTI)

This study aims to provide a reference for the pipeline construction cost, by analysing individual pipeline cost components with historical pipeline cost data. Cost data of 412 pipelines recorded between 1992 and 2008 in the Oil and Gas Journal are collected and adjusted to 2008 dollars with the chemical engineering plant cost index (CEPCI). The distribution and share of these 412 pipeline cost components are assessed based on pipeline diameter, pipeline length, pipeline capacity, the year of completion, locations of pipelines. The share of material and labour cost dominates the pipeline construction cost, which is about 71% of the total cost. In addition, the learning curve analysis is conducted to attain learning rate with respect to pipeline material and labour costs for different groups. Results show that learning rate and construction cost are varied by pipeline diameters, pipeline lengths, locations of pipelines and other factors. This study also investigates the causes of pipeline construction cost differences among different groups. [Received: October 13, 2010; Accepted: December 20, 2010

Zhenhua Rui; Paul A. Metz; Doug B. Reynolds; Gang Chen; Xiyu Zhou

2011-01-01T23:59:59.000Z

74

Construction | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Construction Construction Construction In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. Learn more about the Better Buildings Neighborhood Program. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. Learn more about the Better Buildings Neighborhood Program. Learn about the energy-efficient construction projects that are saving businesses and communities money while creating jobs.

75

Construction of Channels (Indiana)  

Broader source: Energy.gov [DOE]

Permission is required from the Natural Resources Commission is required for the construction or alteration of artificial channels or improved channels of natural watercourses that connect to any...

76

Constructability -- from Qinshan to the ACR  

SciTech Connect (OSTI)

Atomic Energy of Canada Limited (AECL) has recognized the importance of constructability for many years, and it is applying its principals to CANDU projects with increasing success. The CANDU 6 Nuclear Power Plant has been constructed eleven times in the last 25 years. However, the last two units completed on the Qinshan project in China have employed some very innovative construction methods that have not been used on the previous units. In order to make nuclear power generation more competitive, shorter construction schedules and reduced project cost and risks are essential objectives. The application of constructability principles is a major contributor to achieving these objectives. The success of Qinshan has increased the confidence in the new construction methods, which are being implemented on the ACR (Advanced CANDU Reactor) successfully. An ACR construction strategy that utilizes advanced construction techniques has been developed by AECL. The strategy includes paralleling of activities by using extensive modularization and the vertical installation of equipment and modules into the reactor building using a VHL (Very Heavy Lift) crane. This strategy allows short schedules to be met with a minimum risk to the project.

Elgohary, Medhat; Fairclough, Neville; Ricciuti, Rick

2003-09-01T23:59:59.000Z

77

ENVIRONMENTAL CONSTRUCTABILITY IN  

E-Print Network [OSTI]

Engineering Storm Water Quality #12;Linear Construction Flux · Natural resource protection is a design and phase of construction, from start to finish · Be fair for both engineer and contractor · Develop.eqb.state.mn.us/EnvRevGuidanceDocuments.htm Highway Project Design Process (HPDP) Subject Guidance Accessibility Requirements Air Quality Airports

Minnesota, University of

78

Chapter 8: Constructing the Building  

Broader source: Energy.gov (indexed) [DOE]

: : Constructing the Building Developing a Construction Plan Writing Effective Construction Documents Safeguarding Design Goals During Construction Protecting the Site Low-Impact Construction Processes Protecting Indoor Air Quality Managing Construction Waste LANL | Chapter 8 Constructing the Building Developing a Construction Plan A high-performance design is a great achievement, but it doesn't mean much if the building isn't then built as intended. Getting from design to a completed project happens in two stages: 1) development of construction documents and 2) actual construction. To successfully implement a sustainable design, the construction docu- ments must accurately convey the specifics that deter- mine building performance, and they have to set up

79

Y YEAR  

National Nuclear Security Administration (NNSA)

5 79 -7.06% YEAR 2013 2014 Males 59 57 -3.39% Females 26 22 -15.38% YEAR 2013 2014 SES 1 0 -100% EJEK 4 3 -25.00% EN 05 3 2 -33.33% EN 04 22 22 0% EN 03...

80

Y YEAR  

National Nuclear Security Administration (NNSA)

2 40 -4.76% YEAR 2013 2014 Males 37 35 -5.41% Females 5 5 0% YEAR 2013 2014 SES 2 2 0% EJEK 5 4 -20.00% EN 05 5 7 40.00% EN 04 6 6 0% EN 03 1 1 0% NN...

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Y YEAR  

National Nuclear Security Administration (NNSA)

91 81 -10.99% YEAR 2013 2014 Males 67 56 -16.42% Females 24 25 4.17% YEAR 2013 2014 SES 1 2 100% EJEK 9 8 -11.11% EN 04 25 22 -12.00% NN (Engineering) 24...

82

Construction in year 2030: developing an information technology vision  

Science Journals Connector (OSTI)

...fuel cells or biomass boiler associated with it. Intelligent...the recession is over, high public investment will...Processes will become more efficient and streamlined through...Building (CIOB) and the Higher Education Academy. He...

2010-01-01T23:59:59.000Z

83

Construction in year 2030: developing an information technology vision  

Science Journals Connector (OSTI)

...associated with it: engineers or other users might...move beyond the visual environment and simulate the sensory...collaboration and collaboration environments; quality management...the Built and Human environment. He initially qualified...electronics design engineer with British Aerospace...

2010-01-01T23:59:59.000Z

84

Energy Efficient Residential Construction Tax Credit (Personal) |  

Broader source: Energy.gov (indexed) [DOE]

Personal) Personal) Energy Efficient Residential Construction Tax Credit (Personal) < Back Eligibility Construction Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Commercial Heating & Cooling Cooling Construction Design & Remodeling Windows, Doors, & Skylights Ventilation Heating Heat Pumps Insulation Maximum Rebate 4,000 Program Info Start Date 11/01/2005 State Oklahoma Program Type Personal Tax Credit Rebate Amount Amount of eligible expenditures Provider Oklahoma Department of Commerce '''''Note: After a 2 year moratorium on all state tax credits, this credit may be claimed for tax year 2012 and subsequent tax years, for eligible expenditures on or after July 1, 2012.''''' Oklahoma allows a contractor who is the primary builder of an energy

85

Recovery Act Supports Construction of Site's Largest Groundwater Treatment  

Broader source: Energy.gov (indexed) [DOE]

Supports Construction of Site's Largest Groundwater Supports Construction of Site's Largest Groundwater Treatment Facility Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility Construction of the largest groundwater treatment facility at the Hanford Site – a major American Recovery and Reinvestment Act project – is on schedule and more than 70 percent complete. Recovery Act workers with DOE contractor CH2M HILL Plateau Remediation Company are on pace to finish construction of the 200 West Groundwater Treatment Facility this year. Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility More Documents & Publications Hanford Treats Record Amount of Groundwater Recovery Act Invests in Cleanup, Preservation of Hanford Site Locomotives,

86

Existing schemes for constructing high concrete dams and ways to improve them  

Science Journals Connector (OSTI)

1. Improvement of the existing cyclic methods of constructing concrete dams in recent years made it possible to ...

V. I. Teleshev; V. K. Loshak

1982-10-01T23:59:59.000Z

87

Hackney Construction | Open Energy Information  

Open Energy Info (EERE)

Hackney Construction Hackney Construction Jump to: navigation, search Name Hackney Construction Address 309 Farrens Creek Lane/PO Box 13 Place Grangeville, Idaho Zip 83530 Sector Solar Product Green Building, renewable energy Year founded 1991 Number of employees 1-10 Phone number 208-983-3109 Website http://DigitalProductsAndRenew Coordinates 45.926552°, -116.1223654° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.926552,"lon":-116.1223654,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

88

Construction Readiness RM  

Broader source: Energy.gov [DOE]

The authorization to proceed with construction of a new facility is given at the CD-3 phase of the project management cycle, after completion of the final design. Between CD-3 and CD-4 stages of...

89

Pipeline Construction Guidelines (Indiana)  

Broader source: Energy.gov [DOE]

The Division of Pipeline Safety of the Indiana Utility Regulatory Commission regulates the construction of any segment of an interstate pipeline on privately owned land in Indiana. The division has...

90

Passive solar construction handbook  

SciTech Connect (OSTI)

Many of the basic elements of passive solar design are reviewed. The unique design constraints presented in passive homes are introduced and many of the salient issues influencing design decisions are described briefly. Passive solar construction is described for each passive system type: direct gain, thermal storage wall, attached sunspace, thermal storage roof, and convective loop. For each system type, important design and construction issues are discussed and case studies illustrating designed and built examples of the system type are presented. Construction details are given and construction and thermal performance information is given for the materials used in collector components, storage components, and control components. Included are glazing materials, framing systems, caulking and sealants, concrete masonry, concrete, brick, shading, reflectors, and insulators. The Load Collector Ratio method for estimating passive system performance is appended, and other analysis methods are briefly summarized. (LEW)

Levy, E.; Evans, D.; Gardstein, C.

1981-08-01T23:59:59.000Z

91

Genomic library construction  

SciTech Connect (OSTI)

Compositions and methods for amplifying nucleic acid sequences from a single cell are provided. Compositions and methods for constructing a genomic library from a single cell are also provided.

Church, George M. (Brookline, MA); Zhang, Kun (San Diego, CA)

2011-07-26T23:59:59.000Z

92

Strategies for Local Low-Carbon Development  

E-Print Network [OSTI]

zero net energy for all residential construction by 2020 andnet zero energy buildings by 2013 in Ireland, 75% NZEBs ( at 2006 stock of floorspace) by 2020

Zhou, Nan

2014-01-01T23:59:59.000Z

93

Weatherford Inclined Wellbore Construction  

SciTech Connect (OSTI)

The Rocky Mountain Oilfield Testing Center (RMOTC) has recently completed construction of an inclined wellbore with seven (7) inch, twenty-three (23) pound casing at a total depth of 1296 feet. The inclined wellbore is near vertical to 180 feet with a build angle of approximately 4.5 degrees per hundred feet thereafter. The inclined wellbore was utilized for further proprietary testing after construction and validation. The wellbore is available to other companies requiring a cased hole environment with known deviation out to fifty degrees (50) from vertical. The wellbore may also be used by RMOTC for further deepening into the fractured shales of the Steele and Niobrara formation.

Schulte, R.

2002-08-19T23:59:59.000Z

94

Univalent Foundation and Constructive Mathematics  

E-Print Network [OSTI]

Univalent Foundation and Constructive Mathematics Thierry Coquand Oberwolfach, November 18, 2014 #12;Univalent Foundation and Constructive Mathematics Univalent Foundations Voevodsky's program to express mathematics in type theory instead of set theory 1 #12;Univalent Foundation and Constructive

Coquand, Thierry

95

Construction Endorsement Process in Russia.  

E-Print Network [OSTI]

??The construction endorsement and receiving of construction permit is a long lasting and very complicated process in Russia. There is no one and only instruction (more)

Avanesov, Alexander

2010-01-01T23:59:59.000Z

96

Martifer Construction | Open Energy Information  

Open Energy Info (EERE)

services. The division operates in wind farm tower construction, also provides engineering services for solar projects. References: Martifer Construction1 This article...

97

Construction Schedule | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Construction Schedule Current Projects 27-ID and 35-ID APS Vibration Reporting Protocol Summary of Construction Equipment Tests and Activities Jan 2014 Past Projects APCF LOM438...

98

Material efficiency in construction  

E-Print Network [OSTI]

Japan Iron and Steel Federation kt Kilotonne LCA Life-cycle assessment MFA Mass flow analysis Mt Megatonne xix Nomenclature rebar Reinforcement bar RuFUS Reuse of Foundations on Urban Sites SCI Steel Construction Institute t Tonne U/R Utilisation ratio...

Moynihan, Muiris

2014-10-07T23:59:59.000Z

99

Philadelphia Gas Works - Residential and Commercial Construction Incentives  

Broader source: Energy.gov (indexed) [DOE]

Philadelphia Gas Works - Residential and Commercial Construction Philadelphia Gas Works - Residential and Commercial Construction Incentives Program (Pennsylvania) Philadelphia Gas Works - Residential and Commercial Construction Incentives Program (Pennsylvania) < Back Eligibility Commercial Industrial Multi-Family Residential Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Maximum Rebate Residential: $750 Commercial: $60,000 Program Info Start Date 9/1/2012 Expiration Date 8/31/2015 State Pennsylvania Program Type Utility Rebate Program Rebate Amount '''Residential''' Residential Construction: $750 '''Commercial/Industrial''' 10% to 20% to 30% above code, $40/MMBtu first-year savings Philadelphia Gas Works (PGW) provides incentives to developers, home

100

Construction Readiness RM  

Broader source: Energy.gov (indexed) [DOE]

Construction Readiness Review Module Construction Readiness Review Module March 2010 CD- [This Rev Readiness -0 view Module w s Review (CRR OFFICE O CD-1 was used to dev R). This Review OF ENVIRO Standard R Construc Rev Critical D CD-2 M velop the Revie w Module cont ONMENTA Review Pla ction Rea view Modul Decision (CD C March 2010 ew Plan for Sal tains the lesson Review.] AL MANAG an (SRP) adiness le D) Applicabili D-3 lt Waste Proce ns learned from GEMENT ity CD-4 ssing Facility ( m the SWPF Co Post Ope (SWPF) Const onstruction Re eration truction eadiness Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Construction quality assurance report  

SciTech Connect (OSTI)

This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Construction Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project.

Roscha, V.

1994-09-08T23:59:59.000Z

102

Toward a constructive physics  

SciTech Connect (OSTI)

We argue that the discretization of physics which has occurred thanks to the advent of quantum mechanics has replaced the continuum standards of time, length and mass which brought physics to maturity by counting. The (arbitrary in the sense of conventional dimensional analysis) standards have been replaced by three dimensional constants: the limiting velocity c, the unit of action h, and either a reference mass (eg m/sub p/) or a coupling constant (eg G related to the mass scale by hc/(2..pi..Gm/sub p//sup 2/) approx. = 1.7 x 10/sup 38/). Once these physical and experimental reference standards are accepted, the conventional approach is to connect physics to mathematics by means of dimensionless ratios. But these standards now rest on counting rather than ratios, and allow us to think of a fourth dimensionless mathematical concept, which is counting integers. According to constructive mathematics, counting has to be understood before engaging in the practice of mathematics in order to avoid redundancy. In its strict form constructive mathematics allows no completed infinities, and must provide finite algorithms for the computation of any acceptable concept. This finite requirement in constructive mathematics is in keeping with the practice of physics when that practice is restricted to hypotheses which are testable in a finite time. In this paper we attempt to outline a program for physics which will meet these rigid criteria while preserving, in so far as possible, the successes that conventional physics has already achieved.

Noyes, H.P.; Gefwert, C.; Manthey, M.J.

1983-06-01T23:59:59.000Z

103

Rocky Flats Former Construction Workers, Construction Worker Screening  

Broader source: Energy.gov (indexed) [DOE]

Rocky Flats Former Construction Workers, Construction Worker Rocky Flats Former Construction Workers, Construction Worker Screening Projects Rocky Flats Former Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Rocky Flats Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Local Outreach Office: Dwayne Adkins 7510 W. Mississippi Ave., Suite 230 Lakewood, CO 80226 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica

104

Idaho National Laboratory Former Construction Workers, Construction Worker  

Broader source: Energy.gov (indexed) [DOE]

Idaho National Laboratory Former Construction Workers, Construction Idaho National Laboratory Former Construction Workers, Construction Worker Screening Projects Idaho National Laboratory Former Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Idaho National Laboratory (INL) Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: 1-800-866-9663 Local Outreach Office: Dan Obray 456 N. Arthur Avenue Pocatello, ID 83204 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica

105

Waste Isolation Pilot Plant Construction Workers, Construction Worker  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Construction Workers, Construction Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: WIPP Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

106

Office of Design and Construction Architecture/Engineering/Construction Management  

E-Print Network [OSTI]

to construct the Orchestra Pit, and above-grade masonry walls will continue through winter, as weather permits 2011 Project Manager: Tim Burns, Sr. Project Manager - Construction Comments: This is part two

Moore, Paul A.

107

Pinellas Former Construction Worker, Construction Worker Screening Projects  

Broader source: Energy.gov (indexed) [DOE]

Pinellas Former Construction Worker, Construction Worker Screening Pinellas Former Construction Worker, Construction Worker Screening Projects Pinellas Former Construction Worker, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Pinellas Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: 1-800-866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

108

Pipeline compressor station construction cost analysis  

Science Journals Connector (OSTI)

This study aims to provide a reference for pipeline compressor station construction costs by analysing individual compressor station cost components using historical compressor station cost data between 1992 and 2008. Distribution and share of these pipeline compressor station cost components are assessed based on compressor station capacity, year of completion, and locations. Average unit costs in material, labour, miscellaneous, land, and total costs are $866/hp, $466/hp, $367/hp, $13/hp, and $1,712/hp, respectively. Primary costs for compressor stations are material cost, approximately 50.6% of the total cost. This study conducts a learning curve analysis to investigate the learning rate of material and labour costs for different groups. Results show that learning rates and construction component costs vary by capacity and locations. This study also investigates the causes of pipeline compressor station construction cost differences. [Received: March 25, 2012; Accepted; 20 February 2013

Yipeng Zhao; Zhenhua Rui

2014-01-01T23:59:59.000Z

109

Student ID Advisor 1st Year Fall __________ (year) 1st Year Spr. __________ (year) 1st Year Sum. __________ (year)  

E-Print Network [OSTI]

Name Major Student ID Advisor 1st Year Fall __________ (year) 1st Year Spr. __________ (year) 1st) Projected Graduation Date SUBJECT SUBJECT CR. HRS. SUBJECT COURSE # CR. HRS. Advisor Signature Date Student

Barrash, Warren

110

Univalent Foundation and Constructive Mathematics  

E-Print Network [OSTI]

Univalent Foundation and Constructive Mathematics Thierry Coquand Luminy, April 7, 2014 #12;Univalent Foundation and Constructive Mathematics References on univalent foundation V. Voevodsky Univalent foundation home page and "Experimental library of univalent foundation of mathematics" B. Ahrens. C. Kapulkin

Coquand, Thierry

111

Construction Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

North Execution - (2009 - 2011) North Execution - (2009 - 2011) Construction Project Number 2009 2010 2011 Project Description ANMLPL 0001C 76,675.32 - - Animas-Laplata circuit breaker and power rights CRGRFL 0001C - - 7,177.09 Craig Rifle Bay and transfer bay upgrade to 2000 amps; / Convert CRG RFL to 345 kV out of Bears Ear Sub FGE 0019C - - 39,207.86 Replace 69/25kV transformer KX2A at Flaming Gorge FGE 0020C - - 52,097.12 Flaming Gorge: Replace failed KW2A transformer HDN 0069C 16,638.52 208,893.46 3,704,578.33 Replace failed transformer with KZ1A 250 MVA 230/138kv

112

SF6432-CN Construction  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7/31/13 7/31/13 Page 1 of 31 Printed copies of this document are uncontrolled. Retrieve latest version electronically. SANDIA CORPORATION SF 6432-CN (07/2013) Section II STANDARD TERMS AND CONDITIONS FOR FIRM-FIXED PRICE COMMERCIAL CONSTRUCTION CONTRACTS THE FOLLOWING CLAUSES APPLY TO THIS CONTRACT AS INDICATED UNLESS SPECIFICALLY DELETED, OR EXCEPT TO THE EXTENT THEY ARE SPECIFICALLY SUPPLEMENTED OR AMENDED IN WRITING IN THE COVER PAGE OR SECTION I. (CTRL+CLICK ON A LINK BELOW TO ADVANCE DIRECTLY TO THAT SECTION) ACCEPTANCE OF TERMS AND CONDITIONS (Ts&Cs) APPLICABLE LAW ASSIGNMENT AUTHORIZED DISTRIBUTORS BANKRUPTCY CANCELLATION OR TERMINATION FOR CONVENIENCE CHANGES COMPLIANCE WITH LAWS DEFINITIONS DIFFERING SITE CONDITIONS DISPUTES

113

Univalent Foundation and Constructive Mathematics  

E-Print Network [OSTI]

Univalent Foundation and Constructive Mathematics Thierry Coquand Oberwolfach, November 21, 2014 #12;Univalent Foundation and Constructive Mathematics Family of sets over a set Cf. Exercice 3,Richman and Ruitenburg 1 #12;Univalent Foundation and Constructive Mathematics Family of sets over a set We have

Coquand, Thierry

114

Cedar Falls Utilities - Residential New Construction Program | Department  

Broader source: Energy.gov (indexed) [DOE]

Cedar Falls Utilities - Residential New Construction Program Cedar Falls Utilities - Residential New Construction Program Cedar Falls Utilities - Residential New Construction Program < Back Eligibility Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Program Info State Iowa Program Type Utility Rebate Program Rebate Amount 25% electric rate discount for 4 years (if home is heated with natural gas) 25% electric rate discount for 2 years (if home is heated with electricity) Provider Cedar Falls Utilities Cedar Falls Utilities offers incentives to residential customers who construct new energy efficient homes. A rate discount of 25% is available to customers who meet the 5 Star Home Program criteria for new home

115

Small business success story: Lindblad Construction | Argonne National  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lindblad is the contractor for the laboratory's Rapid Response Program, which allows for construction activities valued at $50,000 and under to be performed on an accelerated schedule. The contract is for a three-year period for an estimated total of $3 million. Lindblad is the contractor for the laboratory's Rapid Response Program, which allows for construction activities valued at $50,000 and under to be performed on an accelerated schedule. The contract is for a three-year period for an estimated total of $3 million. Lindblad is the contractor for the laboratory's Rapid Response Program, which allows for construction activities valued at $50,000 and under to be performed on an accelerated schedule. The contract is for a three-year period for an estimated total of $3 million. Small business success story: Lindblad Construction March 27, 2013 Tweet EmailPrint Based in Joliet, Ill., Lindblad Construction has been performing construction services in the Chicagoland area for more than 60 years. Over the last five years, Lindblad has secured a number of sub-contracts

116

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Broader source: Energy.gov (indexed) [DOE]

Power 2010 Program: Combined Construction and Operating Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

117

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Broader source: Energy.gov (indexed) [DOE]

Nuclear Power 2010 Program: Combined Construction and Operating Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

118

Table B37. Water Heating Equipment, Number of Buildings and Floorspace...  

U.S. Energy Information Administration (EIA) Indexed Site

"Food Service ...",349,349,305,"Q","Q",1851,1846,1548,"Q","Q" "Health Care ...",127,126,103,"Q",6,2918,2903,1755,363,785 " Inpatient...

119

Hanford Construction Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

CONSTRUCTION CONSTRUCTION WORKES AT HANFORD: A NEEDS ASSESSMENT Submitted by Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Central Washington Building and Construction Trades Council In cooperation with United Brotherhood of Carpenters University of Cincinnati Occupational Health Foundation George Washington University Zenith Administrators, Inc. Duke University July 1, 1997 Table bt Cóütn 1. Introduction and Background a. Specific Aims b. Rationale for Program 2. Need for Establishing Medical Evaluation and Notification a. Medical Surveillance b. History of Site c. Special Issues for Construction Workers 3. Size of Construction Workers' Population (Since 1943) a. Crude Estimate of Population Size b. Population Before 1950 c. Population After 1950

120

SUN (re)construction | Open Energy Information  

Open Energy Info (EERE)

SUN (re)construction SUN (re)construction Jump to: navigation, search Logo: SUN (re)construction Name SUN (re)construction Address 1351 Harker Avenue Place Palo Alto, California Zip 94301 Sector Efficiency Product Zero-net and grid-neutral buildings Year founded 2009 Number of employees 1-10 Phone number 805.679.3616 Website http://www.sunreconstruction.c Coordinates 37.446933°, -122.141049° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.446933,"lon":-122.141049,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Utility Power Plant Construction (Indiana)  

Broader source: Energy.gov [DOE]

This statute requires a certificate of necessity from the Indiana Utility Regulatory Commission for the construction, purchase, or lease of an electricity generation facility by a public utility.

122

Chapter 8: Constructing the Building  

Broader source: Energy.gov [DOE]

Chapter 8 of the LANL Sustainable Design Guide contains information for construction of the building so it will perform as intended and protect the environment.

123

Career Map: Construction Manager | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

A construction manager in a yellow safety vest instructs his team on proper wind turbine installation. Construction Manager Position Title Construction Manager Alternate...

124

Integrating Safety into Design and Construction | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Integrating Safety into Design and Construction Integrating Safety into Design and Construction DepSecMemoIntegratingSafetyInDesignAndConstruction05Dec2005.pdf More Documents &...

125

Compositions of constructed microbial mats  

DOE Patents [OSTI]

Compositions and methods of use of constructed microbial mats, comprising cyanobacteria and purple autotrophic bacteria and an organic nutrient source, in a laminated structure, are described. The constructed microbial mat is used for bioremediation of different individual contaminants and for mixed or multiple contaminants, and for production of beneficial compositions and molecules.

Bender, Judith A. (Atlanta, GA); Phillips, Peter C. (Decatur, GA)

1999-01-01T23:59:59.000Z

126

FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) | Department...  

Office of Environmental Management (EM)

FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) Form provides information on the federal assistance budget for...

127

From Construction to Making Homes More Livable | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

From Construction to Making Homes More Livable From Construction to Making Homes More Livable From Construction to Making Homes More Livable July 21, 2010 - 3:14pm Addthis Barry Moir has seen the ebb and flow of the construction business. After working nine years in museum construction, he lost his job and started the challenging process of finding work. With a background that also included rehabilitating homes, Moir found an opportunity as a building performance specialist with weatherization service provider ACTION, Inc., in Gloucester, Mass. Compared to his previous work, Moir says, "[ACTION] is much more satisfying. We can do a much more thorough job where we don't have to leave things undone due to funding." Moir was one of two new hires with the nonprofit which has weatherized than 230 homes through the American Recovery and Reinvestment Act. In total,

128

Construction or Extended Operation of Nuclear Plant (Vermont) | Department  

Broader source: Energy.gov (indexed) [DOE]

Construction or Extended Operation of Nuclear Plant (Vermont) Construction or Extended Operation of Nuclear Plant (Vermont) Construction or Extended Operation of Nuclear Plant (Vermont) < Back Eligibility Investor-Owned Utility Utility Program Info State Vermont Program Type Siting and Permitting Any petition for approval of construction of a nuclear energy generating plant within the state, or any petition for approval of the operation of a nuclear energy generating plant beyond the date established in a certificate of public good issued under this title, must be submitted to the public service board no later than four years before the date upon which the approval may take effect. Upon receipt of a petition for approval of construction or operation as provided under this section, the public service board shall notify the

129

From Construction to Making Homes More Livable | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

From Construction to Making Homes More Livable From Construction to Making Homes More Livable From Construction to Making Homes More Livable July 21, 2010 - 3:14pm Addthis Barry Moir has seen the ebb and flow of the construction business. After working nine years in museum construction, he lost his job and started the challenging process of finding work. With a background that also included rehabilitating homes, Moir found an opportunity as a building performance specialist with weatherization service provider ACTION, Inc., in Gloucester, Mass. Compared to his previous work, Moir says, "[ACTION] is much more satisfying. We can do a much more thorough job where we don't have to leave things undone due to funding." Moir was one of two new hires with the nonprofit which has weatherized than 230 homes through the American Recovery and Reinvestment Act. In total,

130

MassSAVE (Electric) - Commercial New Construction Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

MassSAVE (Electric) - Commercial New Construction Program MassSAVE (Electric) - Commercial New Construction Program MassSAVE (Electric) - Commercial New Construction Program < Back Eligibility Commercial Construction Industrial Installer/Contractor Institutional Local Government Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Manufacturing Other Construction Heat Pumps Heating Appliances & Electronics Commercial Lighting Lighting Maximum Rebate 70% of incremental cost of higher efficiency equipment, or an amount that buys down the incremental investment to a 1.5 year simple payback. Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Custom Lighting: $0.40 - $1.00/watt saved High Efficiency Fluorescent Systems: $10-$35/fixture High and Low Bay Fluorescents: $20 - $40/fixture

131

Construction Spending | Data.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Spending Spending BusinessUSA Data/Tools Apps Challenges Let's Talk BusinessUSA You are here Data.gov » Communities » BusinessUSA » Data Construction Spending Dataset Summary Description Construction Spending provides monthly estimates of the total dollar value of construction work done in the U.S. Construction Spending covers the dollar construction work done each month on new structures or improvements to existing structures for private and public sectors. Data estimates include the cost of labor and materials, cost of architectural and engineering work, overhead costs, interest and taxes paid during construction, and contractor's profits. Tags {construction,spending,value,"put in place",private,residential,nonresidential,public,state,local,federal,lodging,office,commercial,"health care",educational,religious,safety,amusement,recreation,transportation,communication,power,highway,street,sewage,waste,disposal,water,supply,conservation,development,manufacturing,structure,building,single-family,multifamily,housing,new,improvement,existing,sectors,cost," labor",materials,architectural,engineering,overhead,interest,taxes,contractor,profit}

132

Vectren Energy Delivery of Indiana (Electric) - Commercial New Construction  

Broader source: Energy.gov (indexed) [DOE]

Vectren Energy Delivery of Indiana (Electric) - Commercial New Vectren Energy Delivery of Indiana (Electric) - Commercial New Construction Rebates (Indiana) Vectren Energy Delivery of Indiana (Electric) - Commercial New Construction Rebates (Indiana) < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit State Government Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Windows, Doors, & Skylights Maximum Rebate Custom/HVAC Systems: $100,000 or 50% of the total project cost Incentive cannot buy down project below 1.5 years payback. Program Info State Indiana Program Type Utility Rebate Program Rebate Amount HVAC Systems (New Construction): $0.12/kWh reduced

133

Operating experience with constructed wetlands for wastewater treatment  

SciTech Connect (OSTI)

Constructed wetlands are treating a variety of municipal, industrial, and runoff wastewaters. The growing interest in this technology is based on 20 years of research demonstrating the beneficial effects of wetlands on water quality, particularly their ability to assimilate carbonaceous and nitrogenous wastes. Constructed wetlands are an attractive option for applications where a land-intensive, natural' treatment technology is desired and where ancillary wildlife benefits will enhance a project's overall environmental balance sheet. This paper summarizes design and operating experience from constructed wetlands representing a variety of applications, including pilot systems in place at several US pulp mills.

Knight, R. (CH2M Hill, Gainesville, FL (United States))

1993-01-01T23:59:59.000Z

134

Materials Requirements for Pipeline Construction  

Science Journals Connector (OSTI)

...find wide use in quality control procedures...problems to the engineer. Relatively...construction engineer is to build a...supply of high quality pipes and a sound...to offer the engineer reproducibility and quality at the right...

1976-01-01T23:59:59.000Z

135

Pipelines in the constructed environment  

SciTech Connect (OSTI)

New pipeline construction, the maintenance of existing pipelines, and the rehabilitation or replacement of deteriorating pipelines often takes place with many challenges and constraints imposed by developmental regulations. The 1998 Pipeline Division Conference provided a forum for those involved in the field to share ideas and learn more about the issues faced today. These 92 peer-reviewed papers reflect the current methods and technology in the field of pipeline construction.

Castronovo, J.P.; Clark, J.A. [eds.

1998-07-01T23:59:59.000Z

136

Fiscal Year 2013 Revegetation Assessment  

SciTech Connect (OSTI)

This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

Jenifer Nordstrom

2013-11-01T23:59:59.000Z

137

FALL SPRING FALL SPRING FALL SPRINGFALL SPRING YEAR 1 YEAR 2 YEAR 3 YEAR 4  

E-Print Network [OSTI]

B FALL SPRING FALL SPRING FALL SPRINGFALL SPRING YEAR 1 YEAR 2 YEAR 3 YEAR 4 ECHM 100 (CHBE 100) 2). There is a pre- requisite of M-273Q (MATH 224). CHMY-373 (CHEM 324) could be taken Spring of year 3. Also, CHMY Math Placement ExamB M-172-Q (MATH 182) 4 cr Chemical Engineering Prerequisite Flowchart Catalog: 2010

Lawrence, Rick L.

138

FALL SPRING FALL SPRING FALL SPRINGFALL SPRING YEAR 1 YEAR 2 YEAR 3 YEAR 4  

E-Print Network [OSTI]

B FALL SPRING FALL SPRING FALL SPRINGFALL SPRING YEAR 1 YEAR 2 YEAR 3 YEAR 4 CHBE 100 2 cr CHMY-141 324) could be taken Spring of year 3. Also, CHMY-371 (CHEM 323) may be substituted for CHMY-373 (CHEM Engineering Prerequisite Flowchart Catalog: 2008-2010 updated 2009 rev. 06/29/10, rwl ­ new course numbers E

Lawrence, Rick L.

139

First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall Spring Fall  

E-Print Network [OSTI]

) Social World Elective2 (3) Technical Elective5 CHEMICAL ENGINEERING Curriculum for Spring SemesterFirst & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall1 Spring1 Fall Spring Fall For your Freshman and Sophomore years, students should follow

Mountziaris, T. J.

140

Berkeley Lab Site Construction Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Construction Projects Construction Projects Old Town Demolition Project Manager: Ted Mankowski, TMankowski@lbl.gov Seismic Upgrades: Phase 2 Project Manager: Jack Heffernan, JSHeffernan@lbl.gov User Test Bed Facility/ FLEXLAB Project Manager: Dan Galvez, DCGalvez@lbl.gov UC Capital Projects Computational Research and Theory Facility Project Manager: Henry Martinez, HMartinez@lbl.gov Solar Energy Research Center (SERC) Project Manager: Jules Feher, JFeher@lbl.gov In Partnership with UC Berkeley Second Campus Sr. Project Manager: Doug Lockhart, DELockhart@lbl.gov What's Happening in the Next Several Weeks: Computational Research & Theory Facility: Currently, the main construction activities are steel and deck placement. The steel placement is due to be complete in December of 2013 and the exterior skin will follow. Project

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Thesaurus construction through knowledge representation  

Science Journals Connector (OSTI)

Semantic metadata describing subject content plays a vital role in supporting indexing and retrieval in Digital Libraries. Mechanisms used to deliver this metadata include keyword collections, thesauri and classifications. Constructing a large thesaurus, however, is a difficult process which can be facilitated through the application of knowledge representation techniques developed for managing and reasoning about concepts. We describe such a scheme a Description Logic (DL) and show through an example how a DL can play a part in the classification construction process, aiding in the production of coherent hierarchies and ensuring that the relationships represented in a thesaurus are sensible.

Sean Bechhofer; Carole Goble

2001-01-01T23:59:59.000Z

142

Commissioning through "EDF Tower" construction  

E-Print Network [OSTI]

michel rouillot -architecte d.p.l.g. CommissioningCommissioningthrough through ??EDF TowerEDF Tower? construction? construction by Michel Rouillot Architect D.P.L.G. michel rouillot -architecte d.p.l.g. What is a building project ? michel rouillot... -architecte d.p.l.g. A spatial answerfor a work structure michel rouillot -architecte d.p.l.g. A very strong relationship between many building participants michel rouillot -architecte d.p.l.g. The production of the buildingThe production of the building...

Rouillot, M.

2004-01-01T23:59:59.000Z

143

DOE - Office of Legacy Management -- Chemical Construction Co Linden Pilot  

Office of Legacy Management (LM)

Chemical Construction Co Linden Chemical Construction Co Linden Pilot Plant - NJ 12 FUSRAP Considered Sites Site: Chemical Construction Co., Linden Pilot Plant (NJ.12 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Chemical Construction Corporation Pilot Plant Chemico NJ.12-1 NJ.12-2 Location: Linden , New Jersey NJ.12-3 Evaluation Year: 1987 NJ.12-4 Site Operations: Performed research and development operations under AEC contract to develop a process for recovering uranium, cobalt, nickel, and copper from low grade residues. NJ.12-5 NJ.12-6 NJ.12-7 Site Disposition: Eliminated - Potential for contamination considered remote due to nature and duration of the operations NJ.12-4 NJ.12-8 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NJ.12-6

144

Austin Energy - Commercial New Construction Efficiency Rebates | Department  

Broader source: Energy.gov (indexed) [DOE]

Austin Energy - Commercial New Construction Efficiency Rebates Austin Energy - Commercial New Construction Efficiency Rebates Austin Energy - Commercial New Construction Efficiency Rebates < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Other Appliances & Electronics Commercial Lighting Lighting Maximum Rebate $200,000 per site, per fiscal year Program Info State Texas Program Type Utility Rebate Program Rebate Amount Tier 1: 125% of qualifying rebates Tier 2: 100% of qualifying rebates Tier 3: 50% of qualifying rebates Provider Austin Energy Austin Energy offers incentives for the construction and major renovation of commercial buildings within its service territory. The program rewards customers by using a tiered payment format, which provides incentives to

145

AEP Ohio - Commercial New Construction Energy Efficiency Rebate Program  

Broader source: Energy.gov (indexed) [DOE]

AEP Ohio - Commercial New Construction Energy Efficiency Rebate AEP Ohio - Commercial New Construction Energy Efficiency Rebate Program (Ohio) AEP Ohio - Commercial New Construction Energy Efficiency Rebate Program (Ohio) < Back Eligibility Commercial Industrial Local Government Municipal Utility Nonprofit Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Water Heating Maximum Rebate General: 50% of total project cost; Contact AEP Ohio Design Incentives: 50% of cost up to $50,000 Program Info State Ohio Program Type Utility Rebate Program Rebate Amount Custom: $0.08/kWh first year savings and $100/peak kW reduction

146

EA-1790: Construction and Operation of a Heterogeneous Feed Biorefinery  

Broader source: Energy.gov (indexed) [DOE]

EA-1790: Construction and Operation of a Heterogeneous Feed EA-1790: Construction and Operation of a Heterogeneous Feed Biorefinery Enerkem Corporation Pontotoc, MS EA-1790: Construction and Operation of a Heterogeneous Feed Biorefinery Enerkem Corporation Pontotoc, MS SUMMARY The U.S. Department of Energy (DOE or the Department) is proposing to provide cost share funding to Enerkem, Inc (Enerkem) for the final design, construction, and operation of a proposed Heterogeneous Feed Biorefinery Project to be located in Pontotoc, Mississippi (hereafter referred to as the biorefinery or the proposed project). The biorefinery would use the dried and post-sorted biomass fraction of municipal solid waste (MSW) and wood biomass as feedstock. Enerkem's biorefinery would produce approximately 10 million gallons (38 million liters) of ethanol per year

147

DOE Announces $160 Million for Biorefinery Construction and Highlights New  

Broader source: Energy.gov (indexed) [DOE]

$160 Million for Biorefinery Construction and $160 Million for Biorefinery Construction and Highlights New Agricultural Program to Promote Biofuels DOE Announces $160 Million for Biorefinery Construction and Highlights New Agricultural Program to Promote Biofuels February 22, 2006 - 12:11pm Addthis Funding Paves the Way for Diversifying America's Energy Mix DECATUR, IL - Energy Secretary Samuel W. Bodman, today announced $160 million in cost-shared funding over three years to construct up to three biorefineries in the United States. The Secretary made the announcement while visiting the Archer Daniels Midland Ethanol Plant, his second of four stops to promote the Advanced Energy Initiative announced by President Bush in his State of the Union address. Secretary Bodman also highlighted the United States Department of Agriculture's announcement today of almost $188

148

New Jersey SmartStart Buildings - New Construction and Retrofits |  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » New Jersey SmartStart Buildings - New Construction and Retrofits New Jersey SmartStart Buildings - New Construction and Retrofits < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Manufacturing Other Construction Heat Pumps Appliances & Electronics Commercial Lighting Lighting Water Heating Maximum Rebate General: incentives may be limited to $500,000 per utility account per year. Custom Measures: limited to lesser of $0.16/kWh or $1.60/therm saved annually; 50% of total costs; or buydown to a 1-year payback period Program Info Funding Source New Jersey Societal Benefits Charge (public benefits fund)

149

Graduate Certificate in Construction Engineering and Management  

E-Print Network [OSTI]

, Green Building Materials and Techniques, Sustainable Development and Construction Dr. Tewodros Ghebrab, Sustainable construction methods and materials in buildings and infrastructure systems, Engineering cost Management. Students choose two electives from: · Construction Safety and Risk Management, · Sustainable

Gelfond, Michael

150

NRC allows TVA to resume construction on unit 1  

SciTech Connect (OSTI)

The article very briefly describes the construction status of the Tennessee Valley Authority (TVA) Watts Bar Nuclear Plant unit 1. The project was halted by TVA for two years due to quality assurance issues. The US Nuclear Regulatory Commission approved resumption of work, noting that corrective actions were adequate. The status of other TVA reactors is also noted.

NONE

1992-01-01T23:59:59.000Z

151

Construction Timing and Expectations | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Construction Timing and Expectations Construction Timing and Expectations Construction Timing and Expectations October 16, 2013 - 5:07pm Addthis Creating a detailed construction schedule that allows all the project elements to be coordinated in a timely manner is fundamental to any successful construction project. The construction schedule should take into account that many tasks cannot be started before others are finished. It should also account for special schedule considerations related to renewable energy systems. Key elements of most new construction or major renovation projects include landscape, structural, architectural, mechanical, electrical, plumbing, communication systems, and renewable energy systems. Maintaining the highest quality of construction across all elements is fundamental to any

152

CRAD, Nuclear Facility Construction - Mechanical Equipment -...  

Office of Environmental Management (EM)

Nuclear Facility Construction - Mechanical Equipment - June 26, 2012 CRAD, Nuclear Facility Construction - Mechanical Equipment - June 26, 2012 June 26, 2012 Nuclear Facility...

153

Summary of Construction Equipment Tests and Activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Equipment Tests A series of tests were conducted by the APS Construction Vibration Measurement Task Force using various pieces of construction equipment at the APCF...

154

FAQS Job Task Analyses - Construction Management | Department...  

Broader source: Energy.gov (indexed) [DOE]

Construction Management FAQS Job Task Analyses - Construction Management FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task...

155

ALGORITHMS FOR CONSTRUCTING COMPARATIVE MAPS  

E-Print Network [OSTI]

. In this paper we present e#cient algorithms that help in automating this e#ort and o#er an explicit setALGORITHMS FOR CONSTRUCTING COMPARATIVE MAPS Debra S. Goldberg Susan McCouch Jon Kleinberg expert analysis, a simple linear algorithm, and a more complex stack­based algorithm. All three methods

Kleinberg, Jon

156

PHP: Constructs and Variables Introduction  

E-Print Network [OSTI]

PHP: Constructs and Variables Introduction This document describes: 1. the syntax and types of variables, 2. PHP control structures (i.e., conditionals and loops), 3. mixed-mode processing, 4. how to use one script from within another, 5. how to define and use functions, 6. global variables in PHP, 7

Vander Zanden, Brad

157

Materials Requirements for Pipeline Construction  

Science Journals Connector (OSTI)

...the same time, pipeline failure must be...the huge cost of repair. The first oil...where the initial pipeline construction cost...cost of a single repair can exceed C1M. TABLE 2. NORTH SEA PIPELINES grade max. water...

1976-01-01T23:59:59.000Z

158

Costume construction for digital characters  

E-Print Network [OSTI]

This paper attempts to gauge how effectively two top-of-the-line cloth simulation programs - MIRALab's MIRA Cloth and Alias/Wavefront's Maya Cloth - could be used by an artist trained in theatrical costume construction to create a digital costume...

Ellison, Barbara Lynn

2012-06-07T23:59:59.000Z

159

Foundation Year Aguideforinternationalstudents  

E-Print Network [OSTI]

Foundation Year Aguideforinternationalstudents #12;2 Contents TheFoundationYears 5 Engineering/Physics/Geophysics FoundationYear 6 ScienceFoundationYear 7 EntryRequirements 8 Moneymatters 10 Universitylife 10 The-termcommitmentandabig investmentinyourfuture.OurFoundationYearsare designedtoprepareyouforundergraduatestudyandto

Molinari, Marc

160

Foundation Year Aguideforstudents  

E-Print Network [OSTI]

Foundation Year Aguideforstudents #12;2 Contents TheFoundationYears 5 Engineering/Physics/Geophysics FoundationYear 6 ScienceFoundationYear 7 EntryRequirements 8 Moneymatters 10 Universitylife 10 TheUniversity 10 Thecity 10 Accommodation 10 Studentaccommodation MontefioreHouse4.. #12;3 OurFoundation

Anderson, Jim

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Year 1 Year 2 Year 3 Year 4 Children's Hospital of  

E-Print Network [OSTI]

Year 1 Year 2 Year 3 Year 4 July General Pediatric Children's Hospital of Michigan High Risk Obstetrics Hutzel Women's Hospital Biochemical Genetics Lab/Metabolic Clinic Harper Hospital/ Children's Hospital of Michigan Reproductive Genetics Hutzel Women's Hospital August General Pediatric Children

Finley Jr., Russell L.

162

Alternative Fuels Data Center: Clean Construction USA  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Construction USA Construction USA to someone by E-mail Share Alternative Fuels Data Center: Clean Construction USA on Facebook Tweet about Alternative Fuels Data Center: Clean Construction USA on Twitter Bookmark Alternative Fuels Data Center: Clean Construction USA on Google Bookmark Alternative Fuels Data Center: Clean Construction USA on Delicious Rank Alternative Fuels Data Center: Clean Construction USA on Digg Find More places to share Alternative Fuels Data Center: Clean Construction USA on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Clean Construction USA Clean Construction USA is a voluntary program that promotes the reduction of diesel exhaust emissions from construction equipment and vehicles by encouraging proper operations and maintenance, use of emissions-reducing

163

FALL SPRING FALL SPRING FALL SPRING FALL SPRING FALL Year 1 Year 2 Year 3 Year 4 Year 5  

E-Print Network [OSTI]

FALL SPRING FALL SPRING FALL SPRING FALL SPRING FALL Year 1 Year 2 Year 3 Year 4 Year 5 CORE W to meet BioE Engineering Elective Reqt. (c) ­ course used to meet ChE Techical Elective Reqt Revised 11

Lawrence, Rick L.

164

SRS Construction Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

SAVANNAH RIVER BUILDING TRADES SAVANNAH RIVER BUILDING TRADES MEDICAL SCREENING PROGRAM A NEEDS ASSESSMENT Submitted by The Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Augusta, Georgia Building and Construction Trades Council In Cooperation with Duke University Medical Center Medlantic Research Institute United Brotherhood of Carpenters Health and Safety Fund University of Cincinnati Medical Center Zenith Administrators, Inc. June 23, 1998 Contents Summary and Response to Needs Assessment Questions , page i 1. Introduction and Rationale, 1 a. Aims, 1 b. Focus of Needs Assessment, 1 c. Organization, 1 d. Rationale for Program, 2 2. Need for Medical Evaluation and Notification, 3 a. Medical Surveillance, 3

165

Project Construction Team | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Construction Team Project Construction Team Project Construction Team October 16, 2013 - 5:06pm Addthis Photo of two men reviewing a large print document. Both men are wearing construction hats and bright vests. A construction team reviews plans for a 1.9 megawatt methane power generator for a U.S. Marine Corps landfill gas-to-energy project. Assembling the right project construction team is crucial and begins with the request for proposal (RFP). Federal agencies create and RFP for construction services using construction documents developed during the final stage of building design. Construction documents are the blueprints on which every project is built and will be used to generate bids for the construction phase of the project. Renewable energy will either be specified in detail in the

166

Year Report (FY 2000) Evaluation of uncertainties in satellite retrievals of aerosol  

E-Print Network [OSTI]

. Third Year Statement of Work 1. Construct clean aerosol data sets for the Mauna Loa (Hawaii), and Cheeka retrievals to the observed variability of ae

167

School construction in Sierra Leone  

E-Print Network [OSTI]

After years of British rule and a decade of civil unrest, rural communities in Sierra Leone were left with the residues of a colonial mentality and the psychological, physical and economic ravages of war. As a result, ...

Rodrguez-Noyola, Joanna

2009-01-01T23:59:59.000Z

168

Estimation of ship construction costs  

E-Print Network [OSTI]

Since the end of the Cold War naval procurement for the US Navy has seen a dramatic decrease. This decrease in defense spending has placed existing programs under more scrutiny than previous years. As a result there is ...

Miroyannis, Aristides

2006-01-01T23:59:59.000Z

169

Secretary Moniz's First Year  

Broader source: Energy.gov [DOE]

Check out our new interactive timeline to recap top moments from Energy Secretary Ernest Moniz's first year in office.

170

Secretary Moniz's First Year  

Broader source: Energy.gov [DOE]

We're looking back at some of the biggest moments from Energy Secretary Ernest Moniz's first year in office.

171

Handbook of energy use for building construction  

SciTech Connect (OSTI)

The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, ralroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. The handbook focuses on new building construction; however, some information for the other parts of the construction industry is also included. The handbook provides building designers with information to determine the energy required for buildings construction and evaluates the energy required for alternative materials, assemblies, and methods. The handbook is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

Stein, R.G.; Stein, C.; Buckley, M.; Green, M.

1980-03-01T23:59:59.000Z

172

Year 1 Year 2 Anne 3 Anne 4 Year 5 Year 6 Year 7Year 3 Year 4 INGENIEUR POLYTECHNICIENINGENIEUR POLYTECHNICIEN  

E-Print Network [OSTI]

: Biology / Chemistry / Computer Science / Economics / Energy / Mechanics and Environmental Sciences / Mathematics and Applied Mathematics / Physics / Science, Technology & Society / Software Systems / Innovation Duration: 2 years - Possibility to be directly admitted to Year 2 Master of ScienceMaster of Science #12

Cengarle, María Victoria

173

Roadmap: Technology Construction Management Bachelor of Science [AT-BS-TECH-COMA  

E-Print Network [OSTI]

Roadmap: Technology ­ Construction Management­ Bachelor of Science [AT-BS-TECH-COMA] College;Roadmap: Technology ­ Construction Management­ Bachelor of Science [AT-BS-TECH-COMA] College of Applied of Applied Engineering, Sustainability and Technology Catalog Year: 2012­2013 Page 1 of 2 | Last Updated: 11

Sheridan, Scott

174

Best practices for system dynamics model design and construction with powersim studio.  

SciTech Connect (OSTI)

This guide addresses software quality in the construction of Powersim{reg_sign} Studio 8 system dynamics simulation models. It is the result of almost ten years of experience with the Powersim suite of system dynamics modeling tools (Constructor and earlier Studio versions). It is a guide that proposes a common look and feel for the construction of Powersim Studio system dynamics models.

Malczynski, Leonard A.

2011-06-01T23:59:59.000Z

175

Constructed Wetlands Research Group meeting Forth Suite, SEPA Riccarton Office, Edinburgh EH14 4AP  

E-Print Network [OSTI]

1 Minutes of Constructed Wetlands Research Group meeting Forth Suite, SEPA Riccarton Office. It was set up several years ago, particularly to support the implementation of constructed farm wetlands be obtained on disk from Neil McLean. Aberdeen Council is applying for funding to implement a wetland

Heal, Kate

176

Fifth Annual Report: 2008 Pre-Construction Eelgrass Monitoring and Propagation for King County Outfall Mitigation  

SciTech Connect (OSTI)

This is the fifth and final report in a series documenting progress of the pre-construction eelgrass restoration and mitigation activities for the proposed King County Brightwater marine outfall, discharging to Puget Sound near Point Wells, Washington. King County began implementing a multiyear eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions, after construction of the outfall. Major eelgrass mitigation program elements include: a) pre-construction monitoring, i.e., documenting initial eelgrass conditions and degree of fluctuation over a 5 year period prior to construction, b) eelgrass transplanting, including harvesting, offsite propagation and stockpiling of local plants for post-construction planting, and c) post-construction planting and subsequent monitoring, occurring in 2009 and beyond. The overall program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2008).

Woodruff, Dana L.; Judd, Chaeli; Thom, Ronald M.; Sather, Nichole K.; Kaufmann, Ronald M.

2010-01-01T23:59:59.000Z

177

Strategic Plan for Patient Care and Prevention Facilities Design & Construction; Engineering Strategic Business Unit  

E-Print Network [OSTI]

The UTMDACC (University of Texas MD Anderson Cancer Center) will realize net savings of $1.6 million in five years by utilizing the PCPF-E SBU (Patient Care and Prevention Facilities Design & Construction; Engineering Strategic Business Unit...

Wangia, Peter Odongo

2009-07-31T23:59:59.000Z

178

Using a Business Process Model as a Central Organizing Construct for an Undergraduate Weather Forecasting Course  

Science Journals Connector (OSTI)

For the last five years, the author has employed a business process model as a central organizing construct for the senior-level Forecasting Techniques course at Embry- Riddle Aeronautical University's Daytona Beach, Florida, campus. The process model ...

John M. Lanicci

2012-05-01T23:59:59.000Z

179

Roseville Electric - Residential New Construction Rebate Program |  

Broader source: Energy.gov (indexed) [DOE]

New Construction Rebate Program New Construction Rebate Program Roseville Electric - Residential New Construction Rebate Program < Back Eligibility Commercial Construction Installer/Contractor Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Construction Design & Remodeling Sealing Your Home Ventilation Solar Buying & Making Electricity Program Info State California Program Type Utility Rebate Program Rebate Amount Energy Efficiency: $500/unit Solar PV: $2/watt Shade Trees: $30/tree Provider Roseville Electric Roseville Electric provides financial incentives to encourage local builders to construct energy efficient homes which incorporate solar resources. Participating builders can choose to build Preferred Homes or

180

Allocation Year Rollover  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Allocation Year Rollover Allocation Year Rollover Allocation Year Rollover: 2013 to 2014 Note: Allocation Year 2013 (AY13) ends at 23:59:59 on Monday, January 13, 2014. AY14 runs from Tuesday, January 14, 2014 through Monday, January 12, 2015. Below are major changes that will go into effect with the beginning of AY14 on Tuesday, January 14, 2014. All times listed are PST. Scheduled System Downtimes There will be no service disruption during the allocation year rollover this year. Interactive and batch use will continue uninterrupted (except for "premium" jobs on Hopper; see below). Charging Across AY Boundary All batch jobs will continue running during the rollover. Time accrued before midnight will be charged to AY13 repos; time accrued after midnight will be charged to AY14 repos. Running batch jobs that are associated with

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

CONSTRUCTION MANAGEMENT QUALIFICATION STANDARD REFERENCE GUIDE  

Broader source: Energy.gov (indexed) [DOE]

Construction Construction Management Qualification Standard Reference Guide August 2009 This page is intentionally blank. Table of Contents i LIST OF FIGURES ..................................................................................................................... iv LIST OF TABLES ........................................................................................................................ v ACRONYMS ................................................................................................................................ vi PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

182

Soap and sand: construction tools for nanotechnology  

Science Journals Connector (OSTI)

...and sand: construction tools for nanotechnology Karen J. Edler Department of Chemistry...UK ( k.edler@bath.ac.uk ) Nanotechnology is the science of making and using...and sand: construction tools for nanotechnology. | Nanotechnology is the science...

2004-01-01T23:59:59.000Z

183

Nuclear Facility Construction - Structural Concrete, May 29,...  

Broader source: Energy.gov (indexed) [DOE]

Nuclear Facility Construction - Structural Concrete, May 29, 2009 (HSS CRAD 64-15, Rev. 0) Nuclear Facility Construction - Structural Concrete, May 29, 2009 (HSS CRAD 64-15, Rev....

184

Landscape Design, Construction and Management Concentration  

E-Print Network [OSTI]

Landscape Design, Construction and Management Concentration Program of Study The Landscape for careers in the landscape and nursery industries, public gardens and arboreta. Opportunities include plant production, landscape design, construction and maintenance, marketing, management

Isaacs, Rufus

185

Constructing the ASCI computational grid  

SciTech Connect (OSTI)

The Accelerated Strategic Computing Initiative (ASCI) computational grid is being constructed to interconnect the high performance computing resources of the nuclear weapons complex. The grid will simplify access to the diverse computing, storage, network, and visualization resources, and will enable the coordinated use of shared resources regardless of location. To match existing hardware platforms, required security services, and current simulation practices, the Globus MetaComputing Toolkit was selected to provide core grid services. The ASCI grid extends Globus functionality by operating as an independent grid, incorporating Kerberos-based security, interfacing to Sandia's Cplant{trademark},and extending job monitoring services. To fully meet ASCI's needs, the architecture layers distributed work management and criteria-driven resource selection services on top of Globus. These services simplify the grid interface by allowing users to simply request ''run code X anywhere''. This paper describes the initial design and prototype of the ASCI grid.

BEIRIGER,JUDY I.; BIVENS,HUGH P.; HUMPHREYS,STEVEN L.; JOHNSON,WILBUR R.; RHEA,RONALD E.

2000-06-01T23:59:59.000Z

186

Berkeley Lab Site Construction Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Old Town Demolition Old Town Demolition The demolition of Old Town Area Buildings 25A, 40, 41, 44, 44A, 44B, 52 and 52A has been completed to make way for the construction of the Solar Energy Research Center (SERC) and a General Purpose Laboratory (GPL). A phased plan has been developed to abate and demolish the remaining buildings within the Old Town Area, namely Buildings 4, 5, 7, 7C, 14, 16 and 16A. Subsurface remediation is subsequently planned to take place to address existing subsurface contamination. The demolition of the subject buildings is part of an overall plan to remediate and redevelop the Old Town area of the Lab. Critical Decision 1 (CD-1, Selection of Alternatives) was approved in October 2013 and $19.4M of funding has been approved for the characterization, deactivation, abatement, demolition and soil remediation

187

Stanford University Sustainable Design & Construction Program  

E-Print Network [OSTI]

March 14, 2014 Y2E2 Building, Room 292E 473 Via Ortega, Stanford, CA 94305 #12;Sustainable DesignStanford University Sustainable Design & Construction Program 2014-2015 Admitted Student Open House for sophisticated structural/construction engineers " Support Design-Build Firms, Design Firms, Construction Firms

Prinz, Friedrich B.

188

Construction Coordination Jan. 2014 March. 2014  

E-Print Network [OSTI]

­ Construct Hut · SU Diesel Storage Tanks ­ Install tanks & polishers, leak detection and power to system. #12 and repair sink holes · Coffee Hut ­ Utility Locate, Utility rough-in · SU Diesel Storage ­ BIO Submit ­ Construct Hut · SU Diesel Storage Tanks ­ Grading, UG elec. and slab construction #12;4 March 2014

Wechsler, Risa H.

189

Constructed wetlands for industry and commerce  

E-Print Network [OSTI]

23/05/2012 1 Constructed wetlands for industry and commerce Brian D'Arcy and Kate Heal Types drainage Resource recovery #12;23/05/2012 2 How do constructed wetlands improve water quality? Treatment of GHG emissions (N2O and CH4) Types of constructed wetland · Stormwater wetlands · Retention ponds

Heal, Kate

190

Applied Science and Technology Task Order Fiscal Year 2008 Year...  

Energy Savers [EERE]

8 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End...

191

Applied Science and Technology Task Order Fiscal Year 2009 Year...  

Broader source: Energy.gov (indexed) [DOE]

9 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End...

192

Applied Science and Technology Task Order Fiscal Year 2010 Year...  

Broader source: Energy.gov (indexed) [DOE]

0 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End...

193

Applied Science and Technology Task Order Fiscal Year 2011 Year...  

Broader source: Energy.gov (indexed) [DOE]

1 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End...

194

Project management knowledge and skills for green construction: Overcoming  

E-Print Network [OSTI]

for green buildings in the construction industry. In line with this, the Building and Construction Authority

Chaudhuri, Sanjay

195

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

196

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

197

Guide to Integrating Renewable Energy in Federal Construction: Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Construction to someone by E-mail Project Construction to someone by E-mail Share Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Facebook Tweet about Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Twitter Bookmark Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Google Bookmark Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Delicious Rank Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Digg Find More places to share Guide to Integrating Renewable Energy in Federal Construction: Project Construction on AddThis.com... Home Introduction Assessing Renewable Energy Options Planning, Programming, & Budgeting

198

Imagine Homes New Construction Occupied Test House  

SciTech Connect (OSTI)

This report summarizes the research findings of a long-term monitoring plan to evaluate the performance of an energy-efficient home constructed in 2010 in San Antonio, Texas. Monitoring of the energy use, energy generation, and temperature conditions for this project occurred between July 2010 and October 2011. The heating, ventilation, and air conditioning system effectively maintained acceptable temperatures and humidity levels in peak cooling and heating and non-peak operating periods. Discrepancies were found between modeled and actual energy use values, with actual space cooling energy use closest to the corresponding modeled value. Energy consumption predicted for lighting, appliances, and miscellaneous electrical loads was significantly higher than measured amounts, and energy consumption predicted for cooling was significantly lower than measured amounts. A high amount of the 1,600 kWh of PV-generated electricity produced annually was sent to the electric grid every month. The solar thermal DHW system was the main source of hot water for most of the year and performed well; during summer, electrical use by the backup system was rare.

Stecher, D.; Rapport, A.; Allison, K.

2013-07-01T23:59:59.000Z

199

Previous Year Awards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Awards Awards Previous Year Awards 2013 Allocation Awards This page lists the allocation awards for NERSC for the 2013 allocation year (Jan 8, 2013 through Jan 13, 2014). Read More » NERSC Initiative for Scientific Exploration (NISE) 2013 Awards NISE is a mechanism used for allocating the NERSC reserve (10% of the total allocation). In 2013 we made the second year of the two-year awards made in 2012, supplemented by projects selected by the NERSC director. Read More » Data Intensive Computing Pilot Program 2012/2013 Awards NERSC's new data-intensive science pilot program is aimed at helping scientists capture, analyze and store the increasing stream of scientific data coming out of experiments, simulations and instruments. Read More » 2012 Allocation Awards This page lists the allocation awards for NERSC for the 2012 allocation

200

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Buildings Energy Data Book: 1.3 Value of Construction and Research  

Buildings Energy Data Book [EERE]

2 2 Value of New Building Construction Relative to GDP, by Year ($2010 Billion) Value of New Construction Put in Place Bldgs. Percent of Residential Commercial (1) All Bldgs. (1) GDP Total U.S. GDP 1980 5.0% 1985 5.8% 1990 4.9% 1995 4.4% 2000 5.2% 2005 6.0% 2006 5.9% 2007 5.2% 2008 4.4% 2009 3.3% 2010 2.6% Note(s): Source(s): 129.8 247.7 377.4 14,660 1) New buildings construction differs from Table 1.3.2 by excluding industrial building construction. DOC, Current Construction Reports: Value of New Construction Put in Place, C30, Aug. 2003, Table 1 for 1980-1990; DOC, Annual Value of Private Construction Put in Place, August 2008 for 1995-2000; DOC, Annual Value of Private Construction Put in Place, February 2012 for 2002-2010; DOC, Annual Value of Public Construction Put in Place, August 2008 for 1995-2000; DOC, Annual Value of Public Construction Put in Place, February 2012 for 2002-2010;

202

Consolidated Construction Consortium Ltd | Open Energy Information  

Open Energy Info (EERE)

Ltd Ltd Jump to: navigation, search Name Consolidated Construction Consortium Ltd Place Chennai - 600 004., Tamil Nadu, India Zip 600004 Sector Biomass, Solar Product Chennai-based construction and engineering firm. The firm is planning to foray into solar and biomass energy via its subsidiary CCCL Infrastructure. References Consolidated Construction Consortium Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Consolidated Construction Consortium Ltd is a company located in Chennai - 600 004., Tamil Nadu, India . References ↑ "Consolidated Construction Consortium Ltd" Retrieved from "http://en.openei.org/w/index.php?title=Consolidated_Construction_Consortium_Ltd&oldid=34386

203

Interior Construction Renovations | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interior Construction Renovations Interior Construction Renovations Interior Construction Renovations October 16, 2013 - 4:53pm Addthis Renewable Energy Options for Interior Construction Renovations Daylighting Passive Solar Heating Solar Water Heating (SWH) Solar Ventilation Air Preheating When a renovation realigns the interior space in a Federal building, proper design of the new space can take advantage of a number of energy technologies. Primarily, the new interior construction should be developed in conjunction with daylighting design to maximize the use of natural light in the space and minimize glare or other lighting issues that affect performance. Passive solar heating, solar water heating (SWH), solar ventilation air preheating, and energy efficiency technologies can also be considered for interior construction renovations.

204

Onsite Wastewater Treatment Systems: Constructed Wetlands  

E-Print Network [OSTI]

Two-compartment septic tank Soil absorption field Constructed wetland Onsite wastewater treatment systems Constructed wetlands Natural wetlands generally have visible water in the system. However, for those at homes, the water flows beneath... the media surface, which limits contact between residents and wastewater. The constructed wetland waste- water treatment system has three main components that work together to purify wastewater: ? A septic tank, which is an en- closed watertight...

Lesikar, Bruce J.

2008-10-23T23:59:59.000Z

205

OMEGA EP Construction - Laboratory for Laser Energetics  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Construction - Laboratory for Laser Energetics Laboratory for Laser Energetics Logo Search Home Around the Lab Past Issues Past Quick Shots About Office of the Director Map to LLE...

206

Catawba County- Green Construction Permitting Incentive Program  

Broader source: Energy.gov [DOE]

Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

207

Example Cost Codes for Construction Projects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides an example outline of cost items and their corresponding cost codes that may be used for construction projects.

1997-03-28T23:59:59.000Z

208

Fermilab | Illinois Accelerator Research Center | Construction...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Construction Progress 08142013 photo photo 04152013 photo 04012013 photo 03262013 photo 03192013 photo 03112013 photo 03042013 photo 02252013 photo 02182013 photo...

209

ODEQ - Construction Stormwater Application and Forms Manual ...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: ODEQ - Construction Stormwater Application and Forms ManualPermittingRegulatory...

210

ODEQ - Construction Stormwater Best Management Practices Manual...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: ODEQ - Construction Stormwater Best Management Practices ManualPermittingRegulatory...

211

Construction Contractor Checklist | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Construction Contractor Checklist For small businesses seeking contracting opportunities with Argonne in the constructiondemolition field, please be sure you have taken the...

212

Construction project scheduling problem with uncertain resource ...  

E-Print Network [OSTI]

... on-going activities. 7 Conclusions and future work .... constrained construction scheduling, Journal of Computing in Civil Engineering, 13(3),. 207-216. [23] Liu...

2004-06-01T23:59:59.000Z

213

Alternative Energy in New State Construction  

Broader source: Energy.gov [DOE]

Texas requires state government departments to compare the cost of providing energy alternatives for new and reconstructed state government buildings and for certain construction or repair to...

214

Wastewater Construction and Operation Permits (Iowa)  

Broader source: Energy.gov [DOE]

These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

215

Hawaii Well Construction & Pump Installation Standards Webpage...  

Open Energy Info (EERE)

Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Well Construction & Pump Installation Standards Webpage Abstract This webpage provides...

216

Colorado Air Pollution Control Division - Construction Permits...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Air Pollution Control Division - Construction Permits Forms and Air Pollutant Emission...

217

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

218

Calendar Year 1996 | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Calendar Year 1996 Documents marked with the * are published in Adobe PDF format. 1996-11-21 - Report IG-0398: Special Report on the Audit of the Management of Department of Energy Construction Projects 1996-11-15 - Report WR-B-97-03: Audit of Groundwater Monitoring at Hanford 1996-11-07 - Report WR-B-97-02: Audit of Bus Service Subsidies at the Idaho National Engineering Laboratory 1996-11-06 - Report WR-B-97-01: Audit of Electrical System Construction Projects at the Nevada Operations Office 1996-10-22 - Report ER-B-97-01: Audit of Economic Development Grants and a Cooperative Agreement with East Tennessee Not-For-Profit Organizations 1996-10-13 - Report INS-9601: Report on the Intelligence Oversight Inspection of the Special Technologies Laboratory 1996-10-07 - Report IG-0397:*

219

WHICH HYDRAULIC MODEL TO USE IN VERTICAL FLOW CONSTRUCTED WETLANDS?  

E-Print Network [OSTI]

WHICH HYDRAULIC MODEL TO USE IN VERTICAL FLOW CONSTRUCTED WETLANDS? Ania Morvannoua , Nicolas-equilibrium model, preferential flow path, vertical flow constructed wetlands INTRODUCTION Constructed wetlands (CWs

Paris-Sud XI, Université de

220

Construction of an Electric Vehicle Implemented in Egypt  

E-Print Network [OSTI]

The design and manufacture of electric vehicles is becoming important with the rising cost of petrol, and the effect of emissions from petrol powered vehicles on our environment. Operating a battery electric vehicle will eliminate emissions inside our cities and reduce our dependence on oil. The number of electric vehicles on the roads is increasing every year as people become more environmentally conscious and gasoline prices are volatile. This study produces a design and construction a battery electric vehicle, and describes the process of constructing and testing of an electric vehicle. This design comprises many steps from choosing the vehicle design, sizing a motor, and the type of batteries used. Finally, a set of experimental results which showing the performance of the designed electric vehicle under certain conditions were conducted. Key Words: electric vehicle, performance, experimental work, lead-acid battery and DC electric motor.

unknown authors

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

APS team works smarter, cuts substation construction costs by 36%  

SciTech Connect (OSTI)

An aggressive, cost-cutting, team of T D employees at Arizona Public Service Co (APS) is building a new distribution substation in Phoenix for less than half the original cost that APS planners had calculated for the project's land, labor and materials. Scheduled for service in June of this year, APS analysts had originally projected land, labor and materials costs for the 20-MVA Bell substation at nearly $1.7-million-not including major equipment such as transformers, circuit breakers, and switches. However, after studying the project, an empowered APS crew was able to slash 36% off the original estimate-more than $610,000. What's more, APS spokesmen say that its new approach to substation construction and design has given its engineers and construction crews a laundry list of additional ideas to try out on future substation ventures. 4 figs., 1 tab.

Not Available

1993-05-01T23:59:59.000Z

222

Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility  

Broader source: Energy.gov (indexed) [DOE]

June 7, 2011 June 7, 2011 Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility RICHLAND, Wash. - Construction of the largest ground- water treatment facility at the Hanford Site - a major American Recovery and Reinvestment Act project - is on schedule and more than 70 percent complete. Recovery Act workers with DOE contractor CH2M HILL Plateau Remediation Company are on pace to finish con- struction of the 200 West Groundwater Treatment Facil- ity this year. Funding for the project comes from the $1.6 billion the Richland Operations Office received from the Recovery Act. The 52,000-square-foot facility will pump contaminated water from the ground, remove contaminants with a combination of treatment technologies, and return clean water to the aquifer. The system will have the capacity to

223

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

224

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

225

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

226

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

227

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

228

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

229

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

230

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

231

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

232

Project Year Spring 2009  

E-Print Network [OSTI]

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

233

Construction Safety Advisory Committee- Membership Roster  

Broader source: Energy.gov [DOE]

CSAC members shall consist of DOE and DOE contractor employees whose normal job duties include program management or operational direction of construction safety. Members shall be nominated by their management based on their construction safety expertise and on the needs of the committee.

234

New method for classifying construction information  

E-Print Network [OSTI]

general classification system is felt more than ever by the construction professionals. The purpose of this study is to analyze the major classification systems of construction works, such as MasterFormat or UniFormat used in the United States, and SfB...

Lee, Sunku

2012-06-07T23:59:59.000Z

235

Construction Design anD Materials  

E-Print Network [OSTI]

Firewise Construction Design anD Materials #12;Firewise Construction Design anD Materials Peter 2000. Peter`s practice included many homes and other buildings in the Interface. His design empha- sized the integration of fire-resistive elements with other important design principles such as proper

236

Survey Constructive nonlinear control: a historical perspective  

Science Journals Connector (OSTI)

In the early days of nonlinear control theory most of the stability, optimality and uncertainty concepts were descriptive rather than constructive. This survey describes their 'activation' into design tools and constructive procedures. Structural properties ... Keywords: Applications, Design tools, Feedback passivation, Inverse optimality, Recursive procedures, Robust stabilization

Petar Kokotovi?; Murat Arcak

2001-05-01T23:59:59.000Z

237

NRC Construction Light Source Flicker: What We  

E-Print Network [OSTI]

frequency] (CFF) ·Health - World Health Organization (1947): · ...a state of complete physical, mental Handbook: Reference & Application (9th Ed.), 2000, p. 3-20 #12;NRC Construction Flicker Effects 1;NRC Construction Flicker Problem 2 ·Does it matter what light source produces the flicker

California at Davis, University of

238

Bicrossproduct construction versus Weyl-Heisenberg algebra  

E-Print Network [OSTI]

We are focused on detailed analysis of the Weyl-Heisenberg algebra in the framework of bicrossproduct construction. We argue that however it is not possible to introduce full bialgebra structure in this case, it is possible to introduce non-counital bialgebra counterpart of this construction. Some remarks concerning bicrossproduct basis for kappa-Poincare Hopf algebra are also presented.

A. Borowiec; A. Pacho?

2012-04-26T23:59:59.000Z

239

Constructive membership predicates as index James Caldwell  

E-Print Network [OSTI]

. This interpretation of membership predicates as index types arises completely naturally in the constructive setting2Constructive membership predicates as index types James Caldwell and Josef Pohl Department, membership predicates over recursive types are inhabited by terms indexing the elements that satisfy

Caldwell, James

240

Construction Documents (100%) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Construction Documents (100%) Construction Documents (100%) Construction Documents (100%) October 16, 2013 - 4:38pm Addthis Construction documents (100%) represent the final set of drawings that will be issued for contractors to bid on. At this point, all architectural and engineering systems have been reviewed and designed to ensure that project goals are being met. A final review with all members participating in previous reviews should be planned to ensure all information from previous design reviews have been incorporated into the construction documents and all other renewable energy integration issues have been resolved before being issued for bid. At this point, it is expected there will be few, if any, changes to the overall building design. The planned renewable energy technologies will

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

GC GUIDANCE ON MINOR CONSTRUCTION THRESHOLDS  

Broader source: Energy.gov (indexed) [DOE]

GUIDANCE GUIDANCE ON MINOR CONSTRUCTION THRESHOLDS We have been asked about how the Department implements what is known as the "minor construction threshold," which limits the amount of certain funds that can be spent on minor construction projects that are not specifically authorized by law. This Guidance is intended to clarify both the applicable law and Department policy. The Secretary's authority to carry out construction projects is subject to several limitations in the Atomic Energy Defense Act (AEDA) on the use of funds appropriated for DOE national security programs. One of these limitations, the "minor construction threshold," caps the amount of "operation and maintenance funds" or "facilities and "infrastructure funds authorized by a DOE

242

Ruihua Construction Corporation RHC | Open Energy Information  

Open Energy Info (EERE)

Ruihua Construction Corporation RHC Ruihua Construction Corporation RHC Jump to: navigation, search Name Ruihua Construction Corporation (RHC) Place Shenzhen, Guangdong Province, China Zip 518040 Sector Solar Product A construction company whose solar subsidiary Resun Solar is constructing a building-integrated PV (BIPV) installation for the Olympics. Coordinates 22.546789°, 114.112556° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":22.546789,"lon":114.112556,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

243

Amchitka Former Workers, Construction Worker Screening Projects |  

Broader source: Energy.gov (indexed) [DOE]

Amchitka Former Workers, Construction Worker Screening Projects Amchitka Former Workers, Construction Worker Screening Projects Amchitka Former Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Amchitka Worker Population Served: All workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied

244

Through the years  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Through the years Through the years Early 1960s Researchers at PNL (now called PNNL) developed the standards and devices for setting and measuring radiation doses received by nuclear industry work- ers. Tens of thousands of people, including children, have been mea- sured by whole-body counters since the 1960s to relate their physical content of radioactive materials to sources such as food and water. 1960s PNL formulated the first use of a digital computer for complete process control of a mass spectrometer. Mid-1960s PNL devised a computer code, called COBRA for COolant Boiling in Rod Arrays, which allowed for three-dimensional, multiphase hydrothermal modeling of reactor and other complex systems. 1967 PNL researchers continued the fundamental scientific and

245

 

U.S. Energy Information Administration (EIA) Indexed Site

B8. Year Constructed, Number of Buildings for Non-Mall Buildings, 2003 B8. Year Constructed, Number of Buildings for Non-Mall Buildings, 2003 Number of Buildings (thousand) All Buildings* Year Constructed 1919 or Before 1920 to 1945 1946 to 1959 1960 to 1969 1970 to 1979 1980 to 1989 1990 to 1999 2000 to 2003 All Buildings* ............................... 4,645 330 527 562 579 731 707 876 334 Building Floorspace (Square Feet) 1,001 to 5,000 ................................ 2,552 174 315 331 298 350 438 481 165 5,001 to 10,000 .............................. 889 71 107 90 120 180 98 158 66 10,001 to 25,000 ............................ 738 55 64 90 95 122 103 151 58 25,001 to 50,000 ............................ 241 19 23 26 33 48 32 39 21 50,001 to 100,000 .......................... 129 7 9 14 22 16 20 28 13

246

Oak Ridge Facilities Construction | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities ... Oak Ridge Facilities Construction Work in wet and mud was common during the construction of Oak Ridge facilities...

247

Sustainable Hazard Resistant Construction Using Indigenous Materials -Bamboo Construction in Darjeeling and Sikkim-  

E-Print Network [OSTI]

Sustainable Hazard Resistant Construction Using Indigenous Materials -Bamboo Construction July 2014 4pm A206a � School of Engineering ABSTRACT Interest in sustainable construction materials material resources, such as bamboo, are an integral part of sustainable development. The use of natural

Davies, Christopher

248

40 Years of Discovery  

SciTech Connect (OSTI)

History is most interesting when seen through the eyes of those who lived it. In this 40th anniversary retrospective of bioscience research at Lawrence Livermore National Laboratory, we've asked 19 scientists to share their personal recollections about a major accomplishment in the program's history. We have not tried to create a comprehensive or seamless story. Rather, we've attempted to capture the perspectives of key individuals, each of whom worked on a research program that met significant milestones. We have focused particularly on programs and accomplishments that have shaped the current Biology and Biotechnology Research Program (BBRP). In addition, we have included a timeline of biosciences at LLNL, a history of the directorate that appeared in the Laboratory's magazine, ''Science & Technology Review'', in 2002, and a list of bioscience-related articles that have appeared over the years in ''Science & Technology Review and its predecessor, Energy & Technology Review''. The landscape of biological science today is stunningly different from 40 years ago. When LLNL bioscience began in 1963, we knew about the structure of DNA and that it was the carrier of genetic information. However, it would be another year before scientists would understand how DNA codes for the production of proteins and more than a decade before the earliest DNA sequence would be known. It is sometimes difficult to remember that it was only 15 years ago that the polymerase chain reaction, a synthetic method to amplify pieces of DNA was developed, and that only within the last half-dozen years has sequence data for entire organisms begun to be available. In this publication, we have tried to capture some of the landmark and seminal research history: radiation effects studies, which were a major reason for founding the biological research program, and flow sorting and chromosome painting, which dramatically changed our ability to study DNA damage and enabled the creation of chromosome-specific clone libraries, a key step toward sequencing the human genome. Several histories relate to the Human Genome Project itself and surrounding technologies, and several to long-standing research themes such as DNA repair, food mutagens, and reproductive biology. Others describe more recent developments such as computational biology, health-care technologies, and biodefense research.

Weinstein, B; Heller, A

2003-07-08T23:59:59.000Z

249

Language constructs for modular parallel programs  

SciTech Connect (OSTI)

We describe programming language constructs that facilitate the application of modular design techniques in parallel programming. These constructs allow us to isolate resource management and processor scheduling decisions from the specification of individual modules, which can themselves encapsulate design decisions concerned with concurrence, communication, process mapping, and data distribution. This approach permits development of libraries of reusable parallel program components and the reuse of these components in different contexts. In particular, alternative mapping strategies can be explored without modifying other aspects of program logic. We describe how these constructs are incorporated in two practical parallel programming languages, PCN and Fortran M. Compilers have been developed for both languages, allowing experimentation in substantial applications.

Foster, I.

1996-03-01T23:59:59.000Z

250

Construction progress of the RHIC electron lenses  

SciTech Connect (OSTI)

In polarized proton operation the RHIC performance is limited by the head-on beam-beam effect. To overcome this limitation two electron lenses are under construction. We give an overview of the construction progress. Guns, collectors and the warm electron beam transport solenoids with their power supplies have been constructed. The superconducting solenoids that guide the electron beam during the interaction with the proton beam are near completion. A test stand has been set up to verify the performance of the gun, collector and some of the instrumentation. The infrastructure is being prepared for installation, and simulations continue to optimize the performance.

Fischer W.; Altinbas, Z.; Anerella, M.; Beebe, E.; et al

2012-05-20T23:59:59.000Z

251

Construction Worker Screening Projects | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Worker » Former Worker Program » Worker » Former Worker Program » Construction Worker Screening Projects Construction Worker Screening Projects Sites listed below are the primary DOE sites served. Construction workers from DOE sites not listed below are covered by the Building Trades National Medical Screening Program (BTMed). Additional information regarding BTMed can be found on their website or by calling 1-800-866-9663. Alaska: Amchitka California: Lawrence Berkeley National Laboratory Lawrence Livermore National Laboratory Sandia National Laboratories (Livermore, CA) Colorado: Rocky Flats Florida: Pinellas Idaho: Argonne National Laboratory-West Idaho National Laboratory Illinois: Argonne National Laboratory Fermi National Accelerator Laboratory Iowa: Ames Laboratory Iowa Army Ammunition Plant

252

,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...  

U.S. Energy Information Administration (EIA) Indexed Site

2009 " ,"(Megawatts and Percent)" ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

253

,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...  

U.S. Energy Information Administration (EIA) Indexed Site

2008 " ,"(Megawatts and Percent)" ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

254

Third Annual Report: 2006 Pre-Construction Eelgrass Monitoring and Propagation for King County Outfall Mitigation  

SciTech Connect (OSTI)

King County proposes to build a new sewer outfall discharging to Puget Sound near Point Wells, Washington. Construction is scheduled for 2008. The Point Wells site was selected to minimize effects on the nearshore marine environment, but unavoidable impacts to eelgrass (Zostera marina) beds are anticipated during construction. To mitigate for these impacts and prepare for post-construction restoration, King County began implementation of a multi-year eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions. Major program elements are a) pre-construction monitoring, i.e., documenting initial eelgrass conditions and degree of fluctuation over 5 years prior to construction, b) eelgrass transplanting, including harvesting, offsite propagating and stockpiling of local plantstock, and post-construction planting, and c) post-construction monitoring. The program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2006). This report describes calendar year 2006 pre-construction activities conducted by Pacific Northwest National Laboratory (PNNL) in support of King County. Activities included continued propagation of eelgrass shoots and monitoring of the experimental harvest plots in the marine outfall corridor area to evaluate recovery rates relative to harvest rates. Approximately 1500 additional shoots were harvested from the marine outfall corridor in August 2006 to supplement the plants in the propagation tank at the PNNL Marine Sciences Laboratory in Sequim, Washington, bringing the total number of shoots to 4732. Eelgrass densities were monitored in the five experimental harvest plots established in the marine outfall corridor. Changes in eelgrass density were evaluated in year-to-year comparisons with initial harvest rates. Net eelgrass density decreased from 2004 post-harvest to 2006 in all plots, despite density increases observed in 2005 in some plots and at some harvest rates. Eelgrass densities within individual subplots were highly variable from year to year, and the change in density in any interannual period did not correlate to the initial 2004 harvest rate. Continued monitoring should help project managers determine an optimum harvest rate that supports rapid recovery of donor eelgrass beds.

Woodruff, Dana L.; Southard, Susan S.; Cullinan, Valerie I.; Kohn, Nancy P.; Anderson, Michael G.; Vavrinec, John

2007-02-01T23:59:59.000Z

255

The role of construction education: a study to evaluate the success of construction education programs in serving the current and future needs of the construction profession  

E-Print Network [OSTI]

prevailing attitudes toward construction education, the role of construction education within the profession, and the success of construction education programs in serving the current and future needs of the profession. A survey questionnaire was used as a...

Brock, Alan Joseph

1988-01-01T23:59:59.000Z

256

MEMORANDUM FROM: PAUL BOSCO AND CONSTRUCTION MANAGEMENTISENIOR REAL  

Broader source: Energy.gov (indexed) [DOE]

15 2009 15 2009 MEMORANDUM FROM: PAUL BOSCO AND CONSTRUCTION MANAGEMENTISENIOR REAL PROPERTY OFFICER SUBJECT: FY 2009 Federal Real Property Reporting Requirement The attached document provides implementing instructions for FY 2009 real property inventory reporting. Please distribute it to the appropriate elements of your organization. This effort is central to the Department's efforts toward removal from the GAO High Risk List. As in previous years, the Department will use the data in the Facility Information Management System (FIMS) to report to GSA. There is very little change in reporting requirements h m last year. The attached guidance contains detailed instructions for each of the requireddata elements. Please ensure that the requireddata is entered into FIMS by November 13,2009, so that the

257

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

258

Master of Architecture Plan (180 credits) Year 1 (35 credits)  

E-Print Network [OSTI]

Master of Architecture Plan (180 credits) Year 1 (35 credits) Fall (16 credits) Spring (19 credits) ARCH 108 Arch. Foundations I (4) ARCH 109 Arch. Foundations II (6) ARCH 103 Intro. to Architecture (3 626 Construction Systems & Assemblies (3) ARCH 530 Environmental Systems I (3) ARCH 541 Global History

259

Oak Ridge Construction Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

CONSTRUCT ON WORKERS CONSTRUCT ON WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 Dr. Eula Bingharn, P.1. University of Cincinnati *Ts revised needs assessment reflects an a4fressçs comments from the NIOSH review of our original needs assessment, July, 1997. SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 * * Dr. Eula Bingham, P.1. University of Cincinnati * * *Thjs rerised needs assessment reflects and addtesses comments from the NIOSH review of our original needs assessment, July, 1997! * SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT Principal Investigator Eula Bingham Introduction - Need for Establishing Medical Evaluation and Page Notification 1 a. Medical Surveillance

260

IWTU Construction Workers Set Largest Process Vessel  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IWTU Construction Workers Set Largest Process Vessel IWTU Construction Workers Set Largest Process Vessel Click on image to enlarge Construction of the Integrated Waste Treatment Unit (IWTU) took a major step forward on Sept. 2, 2009 as crews lifted into place the largest of the six process vessels that will be used to treat radioactive liquid waste stored at the site. The IWTU will use a steam reforming process to solidify the waste for eventual shipment out of Idaho. The vessel and its skid, or framework, were constructed at Premier Technologies in Blackfoot. (Premier is the main small business partner for CH2M-WG Idaho (CWI), the contractor for DOE's Idaho Cleanup Project.) The Carbon Reduction Reformer vessel and skid weigh approximately 60 tons (120,000 lbs.). Because of the weight of the vessel and the location of the

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Digital Construction Platform: A Compound Arm Approach  

E-Print Network [OSTI]

We introduce a novel large-scale Digital Construction Platform (DCP) for on-site sensing, analysis, and fabrication. The DCP is an in-progress research project consisting of a compound robotic arm system comprised of a ...

Spielberg, Nathan A.

2014-01-01T23:59:59.000Z

262

Techniques for Wetlands Construction and Management  

E-Print Network [OSTI]

Wetlands are important ecosystems that contain a vast array of plants and animals. Wetlands perform a variety of vital functions, such as purifying water. This publication explains the role of wetlands and how to construct and manage them....

Locke, Shawn; Frentress, C.; Cathey, James; Mason, C.; Hirsch, R.; Wagner, M.

2007-09-04T23:59:59.000Z

263

General overview of the Nigerian construction industry  

E-Print Network [OSTI]

The purpose of this study is to investigate and provide a general overview of the Nigerian construction industry, its role in the national economy, the main participants in the industry, the problems that they face, and ...

Dantata, Sanusi (Sanusi A.)

2008-01-01T23:59:59.000Z

264

Self-assembling multimeric nucleic acid constructs  

DOE Patents [OSTI]

The invention is directed to constructs and compositions containing multimeric forms of nucleic acid. Multimeric nucleic acids comprise single-stranded nucleic acids attached via biotin to streptavidin and bound with a functional group. These constructs can be utilized in vivo to treat or identify diseased tissue or cells. Repeated administrations of multimeric nucleic acid compositions produce a rapid and specific amplification of nucleic acid constructs and their attached functional groups. For treatment purposes, functional groups may be toxins, radioisotopes, genes or enzymes. Diagnostically, labeled multimeric constructs may be used to identify specific targets in vivo or in vitro. Multimeric nucleic acids may also be used in nanotechnology and to create self-assembling polymeric aggregates such as membranes of defined porosity, microcircuits and many other products.

Cantor, Charles R. (Boston, MA); Niemeyer, Christof M. (Bremen, DE); Smith, Cassandra L. (Boston, MA); Sano, Takeshi (Boston, MA); Hnatowich, Donald J. (Brookline, MA); Rusckowski, Mary (Southborough, MA)

1996-01-01T23:59:59.000Z

265

Self-assembling multimeric nucleic acid constructs  

DOE Patents [OSTI]

The invention is directed to constructs and compositions containing multimeric forms of nucleic acid. Multimeric nucleic acids comprise single-stranded nucleic acids attached via biotin to streptavidin and bound with a functional group. These constructs can be utilized in vivo to treat or identify diseased tissue or cells. Repeated administrations of multimeric nucleic acid compositions produce a rapid and specific amplification of nucleic acid constructs and their attached functional groups. For treatment purposes, functional groups may be toxins, radioisotopes, genes or enzymes. Diagnostically, labeled multimeric constructs may be used to identify specific targets in vivo or in vitro. Multimeric nucleic acids may also be used in nanotechnology and to create self-assembling polymeric aggregates such as membranes of defined porosity, microcircuits and many other products.

Cantor, Charles R. (Boston, MA); Niemeyer, Christof M. (Bremen, DE); Smith, Cassandra L. (Boston, MA); Sano, Takeshi (Boston, MA); Hnatowich, Donald J. (Brookline, MA); Rusckowski, Mary (Southborough, MA)

1999-10-12T23:59:59.000Z

266

Regulating new construction in historic areas  

E-Print Network [OSTI]

This study is an examination of how the restrictiveness of different design regulations impacts the process of new construction in historic areas. The North End, South End, and Back Bay neighborhoods of Boston were identified ...

Sellers-Garcia, Oliver

2006-01-01T23:59:59.000Z

267

Construction Safety Advisory Committee | Department of Energy  

Office of Environmental Management (EM)

meeting and included in the minutes of the meeting. Approved: Larry McCabe, P.E., MBA, CSP, DOEHQ Program Lead DOE Construction Safety Advisory Committee Jeffrey D. Feit,...

268

How to Construct a Seasonal Index  

E-Print Network [OSTI]

For many crops, seasonality is often the dominant factor influencing prices within a single production period. This publication explains how to construct and use several kinds of seasonal indexes for crop marketing information....

Tierney Jr., William I.; Waller, Mark L.; Amosson, Stephen H.

1999-07-12T23:59:59.000Z

269

New Construction Commercial Reference Buildings Archive  

Broader source: Energy.gov [DOE]

Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

270

Statistical Downscaling Using Localized Constructed Analogs (LOCA)  

Science Journals Connector (OSTI)

A new technique for statistically downscaling climate model simulations of daily temperature and precipitation is introduced and demonstrated over the western United States. The localized constructed analogs (LOCA) method produces downscaled ...

David W. Pierce; Daniel R. Cayan; Bridget L. Thrasher

2014-12-01T23:59:59.000Z

271

DNA Assembly Line for Nano-Construction  

ScienceCinema (OSTI)

Building on the idea of using DNA to link up nanoparticles scientists at Brookhaven National Lab have designed a molecular assembly line for high-precision nano-construction. Nanofabrication is essential for exploiting the unique properties of nanoparticl

Oleg Gang

2010-01-08T23:59:59.000Z

272

Doctoral Defense "CONSTRUCTION WORKERS' ABSENCE BEHAVIOR  

E-Print Network [OSTI]

of the dynamic processes of the emergence and exertion of social controls for worker absence behavior in construction projects. To achieve these goals, five interrelated, interdisciplinary studies using survey

Kamat, Vineet R.

273

Construction of Higher Order Finite Element with  

E-Print Network [OSTI]

accuracy, stability Previous work: ffl Cohen, Joly, Tordjman (2D, construction, analysis, performance) ffl \\Gamma4 [b] with b = ?? 1 ?? 2 ?? 3 ?? 4 (bubble function), and b f a iface bubblej function. Accuracy

Kern, Michel

274

Construction Project Safety and Health Plan RM  

Broader source: Energy.gov [DOE]

The Construction Project Safety and Health Plan (CPSHP) Review Module is a tool that assists DOE federal project review teams in evaluating the technical sufficiency of the project readiness in...

275

Existing Commercial Reference Buildings Constructed Before 1980 |  

Broader source: Energy.gov (indexed) [DOE]

Existing Commercial Reference Buildings Constructed Before 1980 Existing Commercial Reference Buildings Constructed Before 1980 Existing Commercial Reference Buildings Constructed Before 1980 The files on this page contain commercial reference building models for existing buildings constructed before 1980, organized by building type and location. These U.S. Department of Energy (DOE) reference buildings are complete descriptions for whole building energy analysis. You can also return to a summary of building types and climate zones and information about other building vintages. These files are updated regularly. There are two versions of these files on this page. Version 1.3_5.0 was updated September 27, 2010 and Version 1.4_7.2 was updated November 13, 2012. You can also view related resources: an archive of past reference buildings files

276

Engineering, Procurement, and Construction Contracts and Performance  

Broader source: Energy.gov (indexed) [DOE]

Engineering, Procurement, and Construction Contracts and Engineering, Procurement, and Construction Contracts and Performance Guarantees Engineering, Procurement, and Construction Contracts and Performance Guarantees October 16, 2013 - 5:03pm Addthis Engineering, procurement, and construction (EPC) contracts with long-term performance guarantees are becoming increasingly popular for some renewable energy technologies, such as commercial-scale photovoltaics systems. EPC contracts give the owner unprecedented assurance that the system will provide the long-term energy benefits advertised without wasting time and money with the architectural and engineering (A&E) firm or expensive change orders. These performance guarantees cover the entire installation and go way beyond manufacturer warranties that only cover specific parts and not

277

Constructing Reliable Distributed Communication Systems with CORBA  

E-Print Network [OSTI]

Constructing Reliable Distributed Communication Systems with CORBA Silvano Maffeis Douglas C Communication software and distributed services for next- generation applications must be reliable, efficient model to support reliable data- and process- oriented distributed systems that communicate through syn

Schmidt, Douglas C.

278

A knowledge based constructability analysis prototype  

E-Print Network [OSTI]

: "Optimum integration of construction knowledge and experience in planning, engineering, procurement, and field operations to achieve overall project objectives. " (Tatum, Vanegas, and Williams, 1986) When defined by the contractor, the following results... methods and technologies. " (Tatum 1987) 1. 2. 2 Project Delivery System The constructability of a project is also contingent on the project delivery system. A project delivery system is: ". . . an organizational concept which assigns specific...

Winter, Laura Jo

2012-06-07T23:59:59.000Z

279

Construction Price Indexes | Data.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Price Indexes Price Indexes BusinessUSA Data/Tools Apps Challenges Let's Talk BusinessUSA You are here Data.gov » Communities » BusinessUSA » Data Construction Price Indexes Dataset Summary Description The Construction Price Indexes provide price indexes for single-family houses sold and for single-family houses under construction. The houses sold index incorporates the value of the land and is available quarterly at the national level and annually by region. The indexes for houses under construction are available monthly at the national level. The indexes are based on data funded by HUD and collected in the Survey of Construction (SOC). Tags {Laspeyres,Constant,Quality,Paasche,Output,Deflator,Fisher,Ideal,Index,absorption,apartment,authorized,authorization,build,building,built,characteristic,completed,completion,construction,contract,contractor,cost,development,dwelling,economic,existing,expenditures,family,financing,finished,floor,home,house,houses,housing,hud,indicator,index,issue,issuing,living,manufactured,market,metropolitan,microdata,month,multifamily,multiple,new,nonresidential,occupancy,occupants,occupied,office,one-unit,owner,permanent,permit,permits,price,private,privately-owned,public,quarters,rebuilt,region,regional,rent,rental,residential,rural,sale,sectional,single,single-family,site-built,size,sold,speculative,spending,stage,started,starts,structure,timeshare,under,unit,units,urban,u.s.,vacancy,valuation,zoning}

280

Planning for Years to Come  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education...

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

A New Years Trip A New Years Trip  

E-Print Network [OSTI]

A New Years Trip A New Years Trip December 26, 2003 - January 3, 2004 By Saul Wilson #12;A New Years Trip 7 INTRODUCTION #12;A New Years Trip 8 rom December 26, 2003 to January 3, 2004 my dad and I

Wilson, W. Stephen

282

Calendar Year 2013  

Broader source: Energy.gov (indexed) [DOE]

3 Office of Inspector General 
1000 3 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Audit Report: OAS-FS-14-03 http://energy.gov/ig/downloads/audit-report-oas-fs-14-03 Audit Report: OAS-FS-14-03

283

Fourth Annual Report: 2007 Pre-Construction Eelgrass Monitoring and Propagation for King County Outfall Mitigation  

SciTech Connect (OSTI)

King County proposes to build a new sewer outfall discharging to Puget Sound near Point Wells, Washington. Construction is scheduled for 2008. The Point Wells site was selected to minimize effects on the nearshore marine environment, but unavoidable impacts to eelgrass (Zostera marina) beds are anticipated during construction. To mitigate these impacts and prepare for post-construction restoration, King County began implementing a multiyear eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions. Major program elements related to eelgrass are (a) pre-construction monitoring, i.e., documenting initial eelgrass conditions and degree of fluctuation over 5 years prior to construction, (b) eelgrass transplanting, including harvesting, offsite propagating, and stockpiling of local plants for post-construction planting, and (c) post-construction planting and subsequent monitoring. The program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2006). This report describes calendar year 2007 pre-construction activities conducted by Pacific Northwest National Laboratory (PNNL) for King County. Activities included continued propagation of eelgrass shoots at the PNNL Marine Sciences Laboratory (MSL) in Sequim, Washington, and monitoring of the experimental harvest plots in the marine outfall corridor area to evaluate recovery rates relative to harvest rates. In addition, 490 eelgrass shoots were also harvested from the Marine Outfall Corridor in July 2007 to supplement the plants in the propagation tank at the MSL, bringing the total number of shoots to 1464. Eelgrass densities were monitored in four of five experimental harvest plots established in the Marine Outfall Corridor. Changes in eelgrass density were evaluated in year-to-year comparisons with initial harvest rates. A net increase in eelgrass density from 2004 post-harvest to 2007 was observed in all plots, despite density decreases observed in 2006 in all plots and at most harvest rates. Eelgrass densities within individual subplots were highly variable from year to year, and the change in density in any interannual period was not related to initial 2004 harvest rate. Harvest rates of neighboring subplots did not appear to affect subplot eelgrass density (Woodruff et al. 2007). Three years post-harvest, eelgrass shoot densities were not significantly different from pre-harvest shoot densities at any harvest level. Additional plans are being discussed with King County to harvest all eelgrass from the construction corridor and hold in the propagation tanks at the MSL for post-construction planting. Under this plan, plants that would have been lost to construction will be held offsite until construction is completed. This strategy reduces and possibly eliminates the need to harvest eelgrass from donor beds located south of the construction area, allowing them to remain undisturbed. However, if eelgrass is harvested from donor beds, the monitoring of eelgrass growth at different harvest rates should help determine an optimum harvest rate that supports rapid recovery of donor eelgrass beds.

Woodruff, Dana L.; Kohn, Nancy P.; Cullinan, Valerie I.; Southard, Susan S.; Vavrinec, John

2007-10-04T23:59:59.000Z

284

Energy Information Administration - Commercial Energy Consumption Survey-  

Gasoline and Diesel Fuel Update (EIA)

. Consumption and Gross Energy Intensity by Year Constructed for Sum of Major Fuels for Non-Mall Buildings, 2003 . Consumption and Gross Energy Intensity by Year Constructed for Sum of Major Fuels for Non-Mall Buildings, 2003 Sum of Major Fuel Consumption (trillion Btu) Total Floorspace of Buildings (million square feet) Energy Intensity for Sum of Major Fuels (thousand Btu/square foot) 1959 or Before 1960 to 1989 1990 to 2003 1959 or Before 1960 to 1989 1990 to 2003 1959 or Before 1960 to 1989 1990 to 2003 All Buildings* ............................. 1,488 2,794 1,539 17,685 29,205 17,893 84.1 95.7 86.0 Building Floorspace (Square Feet) 1,001 to 5,000 .............................. 191 290 190 2,146 2,805 1,838 89.1 103.5 103.5 5,001 to 10,000 ............................ 131 231 154 1,972 2,917 1,696 66.2 79.2 91.0 10,001 to 25,000 .......................... 235 351 191 3,213 4,976 3,346 73.1 70.5 57.0

285

 

Gasoline and Diesel Fuel Update (EIA)

2. Natural Gas Consumption and Conditional Energy Intensity by Year Constructed for Non-Mall Buildings, 2003 2. Natural Gas Consumption and Conditional Energy Intensity by Year Constructed for Non-Mall Buildings, 2003 Total Natural Gas Consumption (billion cubic feet) Total Floorspace of Buildings Using Natural Gas (million square feet) Natural Gas Energy Intensity (cubic feet/square foot) 1959 or Before 1960 to 1989 1990 to 2003 1959 or Before 1960 to 1989 1990 to 2003 1959 or Before 1960 to 1989 1990 to 2003 All Buildings* .............................. 571 871 427 12,097 19,763 11,608 47.2 44.1 36.8 Building Floorspace (Square Feet) 1,001 to 5,000 ............................... 85 98 59 1,222 1,214 648 69.5 81.0 91.5 5,001 to 10,000 ............................. 56 90 56 1,131 1,733 828 49.8 51.9 67.7 10,001 to 25,000 ........................... 103 141 57 2,392 2,909 1,752 42.9 48.4 32.3

286

Energy Information Administration - Commercial Energy Consumption Survey-  

Gasoline and Diesel Fuel Update (EIA)

A. Consumption and Gross Energy Intensity by Year Constructed for Sum of Major Fuels for All Buildings, 2003 A. Consumption and Gross Energy Intensity by Year Constructed for Sum of Major Fuels for All Buildings, 2003 Sum of Major Fuel Consumption (trillion Btu) Total Floorspace of Buildings (million square feet) Energy Intensity for Sum of Major Fuels (thousand Btu/square foot) 1959 or Before 1960 to 1989 1990 to 2003 1959 or Before 1960 to 1989 1990 to 2003 1959 or Before 1960 to 1989 1990 to 2003 All Buildings ............................... 1,522 3,228 1,772 18,031 33,384 20,243 84.4 96.7 87.6 Building Floorspace (Square Feet) 1,001 to 5,000 .............................. 193 300 193 2,168 2,904 1,850 89.0 103.2 104.2 5,001 to 10,000 ............................ 134 263 165 2,032 3,217 1,784 66.0 81.9 92.5 10,001 to 25,000 .......................... 241 432 226 3,273 5,679 3,707 73.6 76.1 60.9

287

Energy Information Administration - Commercial Energy Consumption Survey-  

Gasoline and Diesel Fuel Update (EIA)

2A. Electricity Consumption and Conditional Energy Intensity by Year Constructed for All Buildings, 2003 2A. Electricity Consumption and Conditional Energy Intensity by Year Constructed for All Buildings, 2003 Total Electricity Consumption (billion kWh) Total Floorspace of Buildings Using Electricity (million square feet) Electricity Energy Intensity (kWh/square foot) 1959 or Before 1960 to 1989 1990 to 2003 1959 or Before 1960 to 1989 1990 to 2003 1959 or Before 1960 to 1989 1990 to 2003 All Buildings ................................ 162 538 343 17,509 32,945 19,727 9.2 16.3 17.4 Building Floorspace (Square Feet) 1,001 to 5,000 ................................ 24 54 38 2,072 2,767 1,640 11.4 19.4 23.0 5,001 to 10,000 .............................. 16 41 29 1,919 3,154 1,572 8.2 13.0 18.4 10,001 to 25,000 ............................ 28 69 45 3,201 5,610 3,683 8.7 12.3 12.2

288

Energy Information Administration - Commercial Energy Consumption Survey-  

Gasoline and Diesel Fuel Update (EIA)

2A. Natural Gas Consumption and Conditional Energy Intensity by Year Constructed for All Buildings, 2003 2A. Natural Gas Consumption and Conditional Energy Intensity by Year Constructed for All Buildings, 2003 Total Natural Gas Consumption (billion cubic feet) Total Floorspace of Buildings Using Natural Gas (million square feet) Natural Gas Energy Intensity (cubic feet/square foot) 1959 or Before 1960 to 1989 1990 to 2003 1959 or Before 1960 to 1989 1990 to 2003 1959 or Before 1960 to 1989 1990 to 2003 All Buildings ............................... 580 986 471 12,407 22,762 13,304 46.8 43.3 35.4 Building Floorspace (Square Feet) 1,001 to 5,000 ............................... 86 103 61 1,245 1,271 659 69.0 81.0 92.1 5,001 to 10,000 ............................. 57 101 60 1,154 1,932 883 49.4 52.3 67.6 10,001 to 25,000 ........................... 105 174 65 2,452 3,390 1,982 42.6 51.2 32.7

289

The Foundation Year Monash University  

E-Print Network [OSTI]

The Foundation Year Monash University Foundation Year Monash College has helped me to make my future better. By studying the Foundation Year, I am always learning something new and still having lots of fun. Thanks to the Foundation Year, I am preparing for a successful future. Vonny Leonardy, Monash

Albrecht, David

290

NUCLEAR ENGINEERING Four Year Plan  

E-Print Network [OSTI]

NUCLEAR ENGINEERING Four Year Plan Fall 2009 Nuclear Engineering (67 hrs) CH Grade Perspectives (15;Nuclear Engineering Four Year Plan Starting Fall 2009 FALL Year 1 Credits WINTER Year 1 Credits SPRING I NE 452 3 Neutronic Analysis II NE 457 2 Nuclear Reactor Lab Western Culture (3): NE 467 4 Nucl

Tullos, Desiree

291

Residential Commercial Industrial Year  

Gasoline and Diesel Fuel Update (EIA)

4 4 Residential Commercial Industrial Year and State Volume (million cubic feet) Consumers Volume (million cubic feet) Consumers Volume (million cubic feet) Consumers 2000 Total ................... 4,996,179 59,252,728 3,182,469 5,010,817 8,142,240 220,251 2001 Total ................... 4,771,340 60,286,364 3,022,712 4,996,446 7,344,219 217,026 2002 Total ................... 4,888,816 61,107,254 3,144,169 5,064,384 7,507,180 205,915 2003 Total ................... R 5,079,351 R 61,871,450 R 3,179,493 R 5,152,177 R 7,150,396 R 205,514 2004 Total ................... 4,884,521 62,469,142 3,141,653 5,135,985 7,250,634 212,191 Alabama ...................... 43,842 806,175 26,418 65,040 169,135 2,800 Alaska.......................... 18,200 104,360 18,373 13,999 46,580 10 Arizona ........................

292

Manhattan Project: Y-12 Construction, 1943  

Office of Scientific and Technical Information (OSTI)

Groundbreaking for Y-12, Oak Ridge Y-12: CONSTRUCTION Groundbreaking for Y-12, Oak Ridge Y-12: CONSTRUCTION (Oak Ridge: Clinton, 1943) Events > The Uranium Path to the Bomb, 1942-1944 Y-12: Design, 1942-1943 Y-12: Construction, 1943 Y-12: Operation, 1943-1944 Working K-25 into the Mix, 1943-1944 The Navy and Thermal Diffusion, 1944 Groundbreaking for the Alpha plant of the Y-12 Electromagnetic Plant took place at Oak Ridge on February 18, 1943 (right). Soon blueprints could not be produced fast enough to keep up with construction as Stone & Webster labored to meet Leslie Groves's deadline. The Beta facility was actually begun before formal authorization. While laborers were aggressively recruited, there was always a shortage of workers skilled Y-12 construction, Oak Ridge enough to perform jobs according to the rigid specifications. (A further complication was that some tasks could be performed only by workers with security clearances.) Huge amounts of material had to be obtained (38 million board feet of lumber, for instance), and the magnets needed so much copper for windings that the Army had to borrow almost 15,000 tons of silver bullion from the United States Treasury to fabricate into strips and wind on to coils as a substitute for copper. Treasury silver was also used to manufacture the busbars that ran around the top of the racetracks.

293

Categorical Exclusion 4565, Waste Management Construction Support  

Broader source: Energy.gov (indexed) [DOE]

FornI FornI Project Title: Waste Management Construction Support (4565) Program or Program Office: Y -12 Site Office Location: Oak Ridge Tennessee Project Description: This work scope is an attempt to cover the general activities that construction would perform in support of Waste Management activities. Work includes construction work performed in support of Waste Management Sustainability and Stewardship projects and programs to include: load waste into containers; open, manipulate containers; empty containers; decommission out-of-service equipment (includes removal of liquids, hazardous, and universal wastes); apply fabric and gravel to ground; transport equipment; transport materials; transport waste; remove vegetation; place barriers; place erosion controls; operate wheeled and tracked equipment; general carpentry. Work will be performed on dirt, vegetated, graveled, or paved surfaces in

294

FAQS Job Task Analyses - Construction Management  

Broader source: Energy.gov (indexed) [DOE]

80-2004: Construction Management Functional Area Qualification Standard 80-2004: Construction Management Functional Area Qualification Standard 1 Conducting the Job / Task Analysis DOE-STD-1180-2004: Construction Management Functional Area Qualification Standard Step 1: Identify and evaluate tasks * Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered. o Don't worry about deleting tasks at this point - that is a part of the process further down. * List the tasks (and their sources, e.g., Duties and Responsibilities #1) in the chart below. * Discuss each task as a group and come to a consensus pertaining to Importance and Frequency of the task (i.e., each team

295

Achieving Sustainable Construction in Affordable Housing  

SciTech Connect (OSTI)

An energy-efficient design and construction checklist and information sheets on energy-efficient design and construction are two products being developed. These products will help affordable housing providers take the first steps toward a whole-house approach to the design and implementation of energy-efficient construction practices. The checklist presents simple and clear guidance on energy improvements that can be readily addressed now by most affordable housing providers. The information sheets complement the checklist by providing installation instructions and material specifications that are accompanied by detailed graphics. The information sheets also identify benefits of recommended energy-efficiency measures and procedures including cost savings and impacts on health and comfort. This paper presents details on the checklist and information sheets and discusses their use in two affordable housing projects.

Barcik, M.K.; Creech, D.B.; Ternes, M.P.

1998-12-07T23:59:59.000Z

296

Department of Energy Construction Safety Reference Guide  

SciTech Connect (OSTI)

DOE has adopted the Occupational Safety and Health Administration (OSHA) regulations Title 29 Code of Federal Regulations (CFR) 1926 ``Safety and Health Regulations for Construction,`` and related parts of 29 CFR 1910, ``Occupational Safety and Health Standards.`` This nonmandatory reference guide is based on these OSHA regulations and, where appropriate, incorporates additional standards, codes, directives, and work practices that are recognized and accepted by DOE and the construction industry. It covers excavation, scaffolding, electricity, fire, signs/barricades, cranes/hoists/conveyors, hand and power tools, concrete/masonry, stairways/ladders, welding/cutting, motor vehicles/mechanical equipment, demolition, materials, blasting, steel erection, etc.

Not Available

1993-09-01T23:59:59.000Z

297

Impacts of Rising Construction and Equipment Costs on Energy Industries (released in AEO2007)  

Reports and Publications (EIA)

Costs related to the construction industry have been volatile in recent years. Some of the volatility may be related to higher energy prices. Prices for iron and steel, cement, and concrete -- commodities used heavily in the construction of new energy projects -- rose sharply from 2004 to 2006, and shortages have been reported. How such price fluctuations may affect the cost or pace of new development in the energy industries is not known with any certainty, and short-term changes in commodity prices are not accounted for in the 25-year projections in Annual Energy Outlook 2007. Most projects in the energy industries require long planning and construction lead times, which can lessen the impacts of short-term trends.

2007-01-01T23:59:59.000Z

298

Landscape Architecture Construction Winter, 2013 MWF 9-11:40  

E-Print Network [OSTI]

Landscape Architecture Construction Winter, 2013 NRE 688 MWF 9-11:40 3556 Dana Hall Site Planning. Timesaver Standards for Landscape Architects Hopper. Landscape Architectural Graphic Standards Landphair & Klatt. Landscape Architecture Construction. Thallon. Graphic Guide to Wood Frame Construction. Thallon

Awtar, Shorya

299

Buildings Energy Data Book: 3.5 Commercial Builders and Construction  

Buildings Energy Data Book [EERE]

1 1 Value of New Commercial Building Construction, by Year ($2010 Billion) 1980 159.8 2.5% 1985 226.3 3.0% 1990 227.2 2.6% 1995 203.8 2.0% 2000 312.7 2.5% 2005 302.2 2.2% 2006 334.7 2.3% 2007 383.3 2.6% 2008 399.6 2.7% 2009 328.5 2.3% 2010 257.5 1.8% Source(s): 14,639 14,639 14,254 14,660 DOC, Current Construction Reports: Value of New Construction Put in Place, C30, Aug. 2003, Table 1 for 1980-1990; DOC, Annual Value of Private Construction Put in Place, Aug. 2008 for 1995-2000; DOC, Annual Value of Private Construction Put in Place, Aug. 2011 for 2002-2010; DOC, Annual Value of Public Construction Put in Place, Aug. 2008 for 1995-2000; DOC, Annual Value of Public Construction Put in Place, Aug. 2011 for 2002-2010; and EIA, Annual Energy Review 2010, Aug. 2011, Appendix D, p. 353 for GDP and price deflators.

300

Developing a technology roadmap for construction R&D through interdisciplinary research efforts  

Science Journals Connector (OSTI)

Construction projects are getting bigger and more complex while the average productivity at the industry level is not improving enough. It is essential to look at the means available, in order to improve the efficiency and effectiveness of the construction industry. Technology fusion, which refers to a truly interdisciplinary approach of combining different technology areas, is a new way of sparking off the currently stagnant level of construction technologies. This paper presents a comprehensive technology roadmap developed under the support of Korea Ministry of Construction and Transportation (KMOCT), where the needs for innovative future construction technology are well organized through the interdisciplinary research efforts. To succeed in developing a technology fusion-based construction research plan, four major approaches are adopted: technology foresight, socio-economic prediction, market needs identification, and benchmarking of other efforts. Through these integrated processes, research and development (R&D) programs that cover the entire life cycle of construction projects are proposed. KMOCT is expected to launch 14 of the proposed programs during the next five years on a priority base, funding a total of approximately US$ 5 to 15million for each program.

Changyoon Kim; Hyoungkwan Kim; Seung H. Han; Changwan Kim; Moon Kyum Kim; Sang H. Park

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Nepal Migration Year Book 2011 Migration Year Book  

E-Print Network [OSTI]

Nepal Migration Year Book 2011 1 #12;Nepal Migration Year Book 2011 NIDS NCCR North-South #12;Book Nepal Migration Year Book 2011 Publishers Nepal Institute of Development Studies (NIDS) G.P.O. Box: 7647, Kathmandu, Nepal Email: nids@mail.com.np Web: www.nids.org.np National Centre of Competence in Research

Richner, Heinz

302

After 70 years of service, taking action for the future  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

After 70 years of service, taking action for the future After 70 years of service, taking action for the future Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit After 70 years of service, taking action for the future April 1, 2013 Director Charlie McMillan Lab Director Charlie McMillan. Contact Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Welcome, everyone, to the latest edition of Connections. As we at the Laboratory commemorate 70 years of service to the nation, I think it's appropriate to talk a little about the next 70 years as well. But first, allow me to extend an invitation. On Friday, April 5, the Los Alamos Historical Society will unveil the official military portrait of the man who oversaw construction of the Laboratory-Gen. Leslie Groves. (See

303

Alternative Fuels Data Center: Biofuels Construction and Permitting  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Biofuels Construction Biofuels Construction and Permitting Assistance to someone by E-mail Share Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Facebook Tweet about Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Twitter Bookmark Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Google Bookmark Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Delicious Rank Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Digg Find More places to share Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

304

Minnesota Power - Residential New Construction Rebate Program | Department  

Broader source: Energy.gov (indexed) [DOE]

Minnesota Power - Residential New Construction Rebate Program Minnesota Power - Residential New Construction Rebate Program Minnesota Power - Residential New Construction Rebate Program < Back Eligibility Construction Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Program Info State Minnesota Program Type Utility Rebate Program Rebate Amount $2,000 Provider Minnesota Power Through Minnesota Power's Triple E New Construction Program, homeowners and builders can qualify for special incentive rebates by meeting specific energy standards on new home construction. These standards cover thermal integrity (insulation, windows and doors, exterior wind barriers), airtight construction, moisture control, appliances, lighting, ventilation, and

305

CRAD, Nuclear Facility Construction - Piping and Pipe Supports...  

Office of Environmental Management (EM)

Nuclear Facility Construction - Piping and Pipe Supports Inspection - March 29, 2012 CRAD, Nuclear Facility Construction - Piping and Pipe Supports Inspection - March 29, 2012...

306

Project Level Factors Affecting Quality of Construction Projects.  

E-Print Network [OSTI]

??Quality management is an important topic in today s construction industry as it has become essential for construction companies to focus on increasing quality performance (more)

Bansal, Ankit

2009-01-01T23:59:59.000Z

307

DTE Energy- Commercial New Construction Energy Efficiency Program  

Broader source: Energy.gov [DOE]

DTE Energy offers rebates for commercial facility new construction. Measures eligible for new construction and remodeling incentives encourage an integrated approach to incorporating energy...

308

Hythane project by Hydrogen China Ltd and China Railway Construction...  

Open Energy Info (EERE)

by Hydrogen China Ltd and China Railway Construction Corporation Jump to: navigation, search Name: Hythane project by Hydrogen China Ltd and China Railway Construction Corporation...

309

UPDES Storm Water Permits: General Construction Website | Open...  

Open Energy Info (EERE)

Construction Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: UPDES Storm Water Permits: General Construction Website Abstract this website...

310

Colorado Construction Air Permit Application | Open Energy Information  

Open Energy Info (EERE)

for a construction permit for construction of a commercial or industrial source of air pollution. Form Type ApplicationNotice Form Topic Air Pollution Control Division -...

311

Pepco Update on Current Construction Work and Mirant Generation...  

Broader source: Energy.gov (indexed) [DOE]

Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Pepco Update on Current Construction Work and Mirant Generation Needs for...

312

Wanzek Construction Inc | Open Energy Information  

Open Energy Info (EERE)

Wanzek Construction Inc Wanzek Construction Inc Jump to: navigation, search Name Wanzek Construction, Inc. Place Fargo, North Dakota Zip 58103 Sector Renewable Energy, Wind energy Product Fargo (North Dakota)-based engineering firm specializing in heavy and industrial projects for the market sectors of power, renewable energy, industrial process, heavy/civil and wind energy construction. Coordinates 36.37617°, -99.622804° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.37617,"lon":-99.622804,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

313

Constructing and Forbidding Automorphisms in Lifted Maps  

E-Print Network [OSTI]

Constructing and Forbidding Automorphisms in Lifted Maps Dan Archdeacon Department of Mathematics an algebraic description of surfaces with boundary to study covering maps. The focus is on the relationship between automor­ phisms in the base and lifted maps. We show how to introduce and/or prohibit additional

Archdeacon, Dan

314

31 Tannery Road- Ferreira Construction Headquarters  

High Performance Buildings Database

Branchburg, NJ The 31 Tannery project, located in Branchburg, New Jersey, is the corporate headquarters for Ferreira Construction and Ferreira Group. The facility is 42,000 square feet and serves as office space, shop, and living lab. This state-of-the-art facility raises the bar for a commercial high-performance building, with an eye towards energy independence.

315

Acoustics of modular constructionIndustry overview  

Science Journals Connector (OSTI)

This session will provide an overview of the issues and efforts impacting the commercial modular construction industry throughout North America with particular focus on acoustics in relocatable classrooms. The Modular Building Institute is the international nonprofit trade association representing manufacturers and dealers of commercial modular facilites both temporary and permanent serving educational health care retail industrial military and multi?family markets.

Thomas E. Hardiman

2007-01-01T23:59:59.000Z

316

Symmetries and "principles of construction" in Foundations  

E-Print Network [OSTI]

Symmetries and "principles of construction" in Foundations Giuseppe Longo LIENS, CNRS ­ ENS, Paris Preliminaries A "foundational analysis" (a fully justified search for "unshakable certainties", in 1900) Frege and Hilbert: the search for (proof) principles and "unshakable certainties" (different: absolute laws

Longo, Giuseppe

317

Composite RCS frame systems: construction and peformance  

E-Print Network [OSTI]

The objective of this research program is to further evaluate the performance and constructability of reinforced concrete (RC) column-steel beam-slab systems (RCS) for use in low- to mid-rise space frame buildings located in regions of high wind...

Steele, John Phillip

2004-09-30T23:59:59.000Z

318

The Frankenstein Approach to Wordnet Construction Sprkbanken  

E-Print Network [OSTI]

by scaveng- ing and recycling information from a num- ber of existing lexical resources. Among its more constructed mainly by scav- enging and recycling lexical-semantic information from a number of existing lexical resources. Other noteworthy features of Swesaurus which distin- guish it from most other wordnets

319

Energy and Labor in the Construction Sector  

Science Journals Connector (OSTI)

...The opera-. tional energy demand would be 60.5 mil-lion...and an operational energy demand, due to conduction heat loss...is, 1 percent of the 1976 refinery output of No. 6 fuel oil...final new building construction demand; nevertheless, they may be...

Bruce Hannon; Richard G. Stein; B. Z. Segal; Diane Serber

1978-11-24T23:59:59.000Z

320

Statistical Emulator Construction for Nonlinear Smart Systems  

E-Print Network [OSTI]

efficient surrogates for nonlinear smart material models. We will primarily focus on emulators ferroelectric materials ideal components of a number of smart systems [3]. For example, polyvinylidene fluorideStatistical Emulator Construction for Nonlinear Smart Systems Francesca D. Reale1 and Ralph C

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

ATNI Mid-year Convention  

Broader source: Energy.gov [DOE]

The Affiliated Tribes of Northwest Indians Mid-year Convention will be hosted by the Chehalis Tribe.

322

The Construction of the Konrad Repository - Status and Perspective - 13034  

SciTech Connect (OSTI)

Due to the Atomic Energy Act of Germany the Federation is responsible for the construction and operation of installations for the safekeeping and disposal of radioactive waste. The Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz - BfS) is assigned with this duty. In 1982 the abandoned iron ore mine Konrad near Salzgitter (Federal State of Lower Saxony) was proposed as a repository for low and intermediate level radioactive waste with negligible heat generation. After 20 years of plan approval procedure the license was granted by the Ministry for Environment of Lower Saxony in May 2002. This decision was finally confirmed by the Federal Administrative Court in March 2007. The construction has started, but former assumptions about the beginning of waste emplacement tuned out to be too optimistic. In the course of the preparatory work and the implementation planning it turned out that many changes need to be done. As a matter of fact most of the documents and planning originate from the 1990's and need to be revised because from that time on until now no adaptation was appropriate. The necessity to apply the state-of-the-art technology and other legal implications give rise to further changes and new licensing procedures, especially building licenses. Furthermore, the license from 2002 also includes a lot of collateral clauses that need to be fulfilled before radioactive waste can be emplaced. With this in mind, the time frame for the construction of the Konrad repository was revised in 2010. As a result, the completion of the erection before 2019 does not seem to be realistic. (authors)

Kunze, V. [Bundesamt fuer Strahlenschutz - BfS, Postfach 10 01 49, 38201 Salzgitter (Germany)] [Bundesamt fuer Strahlenschutz - BfS, Postfach 10 01 49, 38201 Salzgitter (Germany)

2013-07-01T23:59:59.000Z

323

Geopolymer concretes: a green construction technology rising from the ash  

SciTech Connect (OSTI)

Researchers at Louisiana Tech University have embarked on a multi-year research initiative to develop applications for inorganic polymer concrete, or geopolymer concrete, in the area of civil construction, and to bring solve of these applications to market. One objective was to produce a spray-on coating for use in the harsh environment of wastewater conveyance and treatment facilities. Another project is to establish relationships between fly ash composition and particle size distribution and the mechanical attributes and workability of the resulting geopolymer concrete. A third project is to develop a 'smart' geopolymer concrete whose response to a given electric current can be correlated to the stress level to which the structure is subjected. 1 fig., 6 photos.

Allouche, E. [Louisiana Tech University, LA (United States)

2009-07-01T23:59:59.000Z

324

An Australian Icon - Planning and Construction of the Parkes Telescope  

E-Print Network [OSTI]

By almost any measure, the Parkes Radio Telescope is the most successful scientific instrument ever built in Australia. The telescope is unsurpassed in terms of the number of astronomers, both national and international, who have used the instrument, the number of research papers that have flowed from their research, and the sheer longevity of its operation (now over fifty years). The original planners and builders could not have envisaged that the telescope would have such an extraordinarily long and productive future. From the start, it was an international project by CSIRO that in the 1950s launched Australia into the world of `big science'. Partly funded by the US Carnegie and Rockefeller foundations, it was designed in England by Freeman Fox & Partners, and built by the German firm MAN. This article will give an overview of the origins of the idea for the telescope and the funding, planning and construction of the Parkes dish over the period 1954 to 1961.

Robertson, Peter

2012-01-01T23:59:59.000Z

325

SRNL RADIONUCLIDE FIELD LYSIMETER EXPERIMENT: BASELINE CONSTRUCTION AND IMPLEMENTATION  

SciTech Connect (OSTI)

The purpose of this document is to compile information regarding experimental design, facility design, construction, radionuclide source preparation, and path forward for the ten year Savannah River National Laboratory (SRNL) Radionuclide Field Lysimeter Experiment at the Savannah River Site (SRS). This is a collaborative effort by researchers at SRNL and Clemson University. The scientific objectives of this study are to: Study long-term radionuclide transport under conditions more representative of vadose zone conditions than laboratory experiments; Provide more realistic quantification of radionuclide transport and geochemistry in the vadose zone, providing better information pertinent to radioactive waste storage solutions than presently exists; Reduce uncertainty and improve justification for geochemical models such as those used in performance assessments and composite analyses.

Roberts, K.; Kaplan, D.; Bagwell, L.; Powell, B.; Almond, P.; Emerson, H.; Hixon, A.; Jablonski, J.; Buchanan, C.; Waterhouse, T.

2012-10-17T23:59:59.000Z

326

Released: June 2006  

U.S. Energy Information Administration (EIA) Indexed Site

. Summary Table: Totals and Medians of Floorspace, Number of Workers, and Hours of Operation for Non-Mall Buildings, 2003" . Summary Table: Totals and Medians of Floorspace, Number of Workers, and Hours of Operation for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)","Total Floorspace (million square feet)","Total Workers in All Buildings (thousand)","Median Square Feet per Building (thousand)","Median Square Feet per Worker","Median Hours per Week","Median Age of Buildings (years)" "All Buildings* ...............",4645,64783,72807,4.6,1000,50,30.5 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2552,6789,9936,2.4,750,48,30.5 "5,001 to 10,000 ..............",889,6585,7512,7.2,1300,50,30.5 "10,001 to 25,000 .............",738,11535,10787,15,1611,55,28.5

327

Updated 5/20/14 Freshman Year (32) Sophomore Year (34) Junior Year (34)  

E-Print Network [OSTI]

Updated 5/20/14 Freshman Year (32) Sophomore Year (34) Junior Year (34) Fall (15) Spring (18) Fall (17) Spring (16) Fall (18) Spring (16) Fall (16) Spring (13) CALC I (4) CALC III [4] SOLIDS (3) CALC membership recommended prerequisite corequisite Engineering-related summer job or internship recommended lab

328

Updated 3/21/13 Freshman Year (32) Sophomore Year (34) Junior Year (34)  

E-Print Network [OSTI]

Updated 3/21/13 Freshman Year (32) Sophomore Year (34) Junior Year (34) Fall (15) Spring (17) Fall (18) Spring (16) Fall (18) Spring (16) Fall (16) Spring (13) CALC I (4) CALC III [4] SOLIDS (3) CALC membership recommended prerequisite corequisite Engineering-related summer job or internship recommended lab

329

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network [OSTI]

. Income Expenditure Assets Liabilities http://www.fin.mmu.ac.uk/f18_001b.htm06/07/2004 13:02:41 #12;5 Year Financial Profile - Charts - Income 5 Year Financial Profile Charts Income Back http://www.fin.mmu.ac.uk/f18 Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_001d.htm06/07/2004 13:02:52 #12;5 Year

330

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network [OSTI]

. Income Expenditure Assets Liabilities http://www.fin.mmu.ac.uk/f18_0029.htm06/07/2004 13:01:23 #12;5 Year Financial Profile - Charts - Income 5 Year Financial Profile Charts Income Back http://www.fin.mmu.ac.uk/f18 Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_002d.htm06/07/2004 13:01:34 #12;5 Year

331

400A Construction Schedule | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APCF APCF Past APCF Memoranda APCF Past Construction Past APCF Construction Day Activity Impact Monday - 10.01.12 Excavation Small Concrete Small Site Utilities Small Tuesday - 10.02.12 Excavation Small Concrete Small Site Utilities Small Wednesday - 10.03.12 Excavation Small Concrete Small Site Utilities Moderate Thursday - 10.04.12 Excavation Small Concrete Small Site Utilities Moderate Friday - 10.05.12 Excavation Small Concrete Small Site Utilities Moderate Site Utility water line hot tap Moderate Saturday - 10.06.12 No work is scheduled for the weekends -/- Sunday - 10.07.12 No work is scheduled for the weekends -/- Monday - 10.08.12 Excavation Small Concrete Small Interior underground plumbing Small Site Utilities Moderate Site Utility water line hot tap Moderate

332

Hanford Waste Treatment Plant Construction Quality Review  

Broader source: Energy.gov (indexed) [DOE]

ARPT-WTP-2011-002 ARPT-WTP-2011-002 Site: DOE Hanford Waste Treatment Plant Subject: Office of Independent Oversight's Office of Environment, Safety and Health Evaluations Activity Report for the Hanford Waste Treatment Plant Construction Quality Review Dates of Activity 02/14/2011 - 02/17/2011 Report Preparer Joseph Lenahan Activity Description/Purpose: The purpose of the visit was to perform a review of construction quality assurance at the Waste Treatment Plant (WTP) site activities concurrently with the Department of Energy (DOE) WTP staff. One focus area for this visit was piping and pipe support installations. The Office of Health, Safety and Security (HSS) attended several Bechtel National Incorporated (BNI) project meetings, reviewed the WTP project quality assurance program, reviewed DOE-WTP inspection reports completed by the DOE-WTP

333

APCF Construction Schedule | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APCF APCF Past APCF Memoranda APCF, Construction Schedule This is a tentative schedule of the daily construction at APCF. For the preliminary two to three week look ahead schedule, please click the PDF calendar to the left. The potential for ground vibration is noted in the "Impact" column (None, Small, Moderate, High, Very High). Daily schedule for dates up to 01.17.2014 Day Activity Impact Monday - 08.05.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Site Grading Low Tuesday - 08.06.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Wednesday - 08.07.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Thursday - 08.08.13 Studs and Drywall None Ceiling Piping None Curtain Wall None

334

The construction of the L3 experiment  

Science Journals Connector (OSTI)

The L3 experiment is one of the six large detectors designed for the new generation of electron-positron accelerators. It is the only detector that concentrates its efforts on limited goals of measuring electrons, muons and photons. By not attempting to identify hadrons, L3 has been able to provide an order of magnitude better resolution for electrons, muons and photons. Vertices and hadron jets are also studied. The construction of L3 has involved much state of the art technology in new principles of vertex detection and in new crystals for large scale electromagnetic shower detection and ultraprecise muon detection. This paper presents a summary of the construction of L3.

B. Adeva; M. Aguilar-Benitez; H. Akbari; J. Alcaraz; A. Aloisio; J. Alvarez-Taviel; G. Alverson; M.G. Alviggi; H. Anderhub; A.L. Anderson; A.M. Angelov; T.H. Angelov; G.H. Antchev; L. Antonov; D. Antreasyan; A. Arefiev; I.H. Atanasov; B. Auroy; R. Ayad; O.L. Ayranov; T. Azemoon; T. Aziz; U. Bachmann; P. Bhler; J.A. Bakken; L. Baksay; H. Baldinger; R.C. Ball; J. Ballansat; S. Banerjee; J. Bao; G. Barbier; L. Barone; G. Basti; A. Bay; F. Beauvais; U. Becker; R. Beissel; S. Bendig; P. Bn; J. Berdugo; P. Berges; M. Berthet; Y. Bertsch; B.L. Betev; A. Biland; A. Bischoff; M. Bischops; R. Bizzarri; J.J. Blaising; M. Blanc; P. Blmeke; B. Blumenfeld; G.J. Bobbink; M. Bocciolini; K.D. Boffin; W. Bohlen; A. Bhm; T. Bhringer; H. Bonnefon; C. Bopp; B. Borgia; K. Bosseler; J.F. Bottolier; M. Bourquin; D. Boutigny; P. Bowditch; J.G. Branson; D. Braun; I.C. Brock; F. Bruyant; M. Buchholz; B. Bcken; W. Bulgeroni; R. Burel; J.D. Burger; C. Burgos; J.P. Burq; L. Caiazzo; M. Caillat; B. Camberlin; D. Campana; C. Camps; V. Canale; M. Capell; F. Carbonara; F. Carminati; A.M. Cartacci; M. Cerrada; F. Cesaroni; Y.H. Chang; J.W. Chapman; M. Chemarin; A. Chen; C. Chen; H.F. Chen; H.S. Chen; M. Chen; M.L. Chen; S.R. Chendvankar; G. Chevenier; S. Chidzik; G. Chiefari; C.Y. Chien; F. Chollet; M. Chumakov; C. Civinini; I. Clare; R. Clare; G. Coignet; N. Colino; V. Commichau; G. Conforto; P. Cristofori; F. Crijns; X.Y. Cui; T.S. Dai; R. D'Alessandro; M. Daniel; X. De Bouard; B. Debye; G. Decreuse; A. Degr; K. Deiters; E. Dnes; P. Denes; F. DeNotaristefani; M. Deutschmann; M. Dhina; B. Didierjean; M. Diemoz; M. Dietrich; H.A. Dimitrov; C. Dionisi; F. Dittus; M. Dohmen; R. Dolin; J.F. Donahue; A. Donat; E. Drago; K.H. Dreger; T. Driever; G. Dromby; P. Duinker; I. Duran; M. Elkacimi; H. Elmamouni; A. Engler; F.J. Eppling; F.C. Ern; I. Erne; H. Esser; P. Extermann; R. Fabbretti; G. Faber; S. Falciano; T. Falk; S.J. Fan; M. Favre; J. Fay; S. Fehr; J. Fehlmann; M. Feldmann; H. Fenker; T. Ferguson; M. Fernandez; F. Ferroni; H. Fesefeldt; J. Field; J.M. Figarola; C.F. Figueroa; G.A. Filipov; B. Folign; G. Forconi; T. Foreman; V. Franzke; W. Frei; K. Freudenreich; W. Friebel; M. Fukushima; G. Gaillard; M. Gailloud; Yu. Galaktionov; E. Gallo; S.N. Ganguli; D. Garelick; S.S. Gau; G. Gavrilov; E. Gennari; S. Gentile; M. Gettner; C. Girard; M. Glaubman; S. Goldfarb; Z.F. Gong; E. Gonzalez; A. Gordeev; Yu. Gorodkov; P. Gttlicher; C. Goy; M. Goyot; G. Gratta; A. Grimes; C. Grinnell; M. Gruenewald; M. Guanziroli; S. Guerra; C. Guillon; A. Gurtu; D. Gsewell; H.R. Gustafson; M. Haensli; M. Haan; C. Haller; T. Hamacher; H. Hammers; K. Hangarter; S. Hancke; M. Harris; D. Harting; F.G. Hartjes; C.F. He; A. Heavey; T. Hebbeker; M. Hebert; R. Heller; Ch. Helmrath; J. Herrmann; G. Herten; U. Herten; A. Herv; H. Hesser; G. Hilgers; K. Hilgers; H. Hofer; H. Hofer; M. Hofer; T. Hofer; F. Hoffmann; U. Horisberger; I. Horvath; L.S. Hsu; G.Q. Hu; B. Ille; M.M. Ilyas; G. Improta; V. Innocente; E. Isiksal; E. Jagel; B.N. Jin; L.W. Jones; M. Jongmanns; H. Jung; P. Kaaret; O. Kaelin; W. Kaestli; Yu. Kamyshkov; D. Kaplan; W. Karpinski; Y. Karyotakis; W. Kertzer; V. Khoze; G. Kirchhoff; W. Kittel; A. Klimentov; P.F. Klok; M. Kollek; M. Koller; A.C. Knig; O. Kornadt; V. Koutsenko; R.W. Kraemer; V.R. Krastev; A. Kratel; W. Krenz; A. Kuhn; A. Kunin; S. Kwan; J. Lacotte; M. LaMarra; G. Landi; W. Lange; K. Lanius; D. Lanske; S. Lanzano; J.M. Le Goff; J.C. Le Marec; D. Lea; M. Lebeau; P. Lebrun; P. Lecomte; J. Lecoq; P. Le Coultre; I. Leedom; A. Lger; F. Lehmann; L. Leistam; R. Leiste; E. Lejeune; B. Leoni; J. Lettry; X. Leytens; C. Li; H.T. Li; L. Li; P.J. Li; X.G. Li; J.Y. Liao; Z.Y. Lin; F.L. Linde; D. Linnhfer; E. Loftin; W. Lohmann; S. Lks; E. Longo; Y.S. Lu; J.M. Lubbers; K. Lbelsmeyer; C. Luci; D. Luckey; X. Lue; L. Luminari; G. Lunadei; F. Lrken; H. Ma; W.G. Ma; M. MacDermott; N. Madjar; R. Magahiz; M. Maire; P.K. Malhotra; A. Malinin; C. Mana; F. Manna; G. Manto; Y.F. Mao; M. Maolinbay; P. Marchesini; A. Marchionni; M. Markwalder; P. Marsden; J.P. Martin; L. Martinez; H.U. Martyn; F. Marzano; V. Marzullo; F. Masciocchi; G.G.G. Massaro; L. Massonnet; T. Matsuda; G. Maurelli; K. Mazumdar; P. McBride; G. Medici; H. Meier; Th. Meinholz; M. Merk; R. Mermod; L. Merola; M. Meschini; W.J. Metzger; M. Micke; U. Micke; G.B. Mills; J. Mnich; M. Moeller; A. Molinero; L. Montanet; B. Monteleoni; R. Montino; G. Morand; R. Morand; S. Morganti; V. Morgunov; R. Mount; M. Moynot; P. Mugnier; W. Ngeli; E. Nagy; M. Napolitano; S. Neboux; H. Newman; Ch. Neyer; K. Nguyen; L. Niessen; A. Nikitin; W.D. Nowak; M. Okle; P. Olmos; J. Onvlee; D. Osborne; J. Ossmann; D. Pandoulas; H. Paprotny; A. Parmentola; G. Passeggio; G. Paternoster; S. Patricelli; Y.J. Pei; Y. Peng; Y. Peng; D. Perret-Gallix; J. Perrier; E. Perrin; G. Perrot; P. Petitpas; P. Petschner

1990-01-01T23:59:59.000Z

335

Construction Project Safety and Health Plan RM  

Broader source: Energy.gov (indexed) [DOE]

Construction Project Safety and Construction Project Safety and Health Plan Review Module March 2010 CD-0 Co 0 Le OFFICE O onstructi CD-1 This Review ssons learned f OF ENVIRO Standard ion Proje Rev Critical D CD-2 M w Module has b from the pilot h ONMENTA Review Pla ect Safety view Modul Decision (CD CD March 2010 been piloted at have been inco AL MANAG an (SRP) y and He le D) Applicabili D-3 the INL IWTU orporated in Re GEMENT alth Plan ity CD-4 U Project. eview Module. n Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM

336

Portsmouth and Paducah Construction Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

Needs Assessment for Needs Assessment for Medical Screening of Construction Workers at the Portsmouth and Paducah Gaseous Diffusion Plants Introduction In 1993 the U.S. Congress enacted Section 3162 of the Defense Authorization Act, which directed the Department of Energy (DOE) to initiate programs to evaluate the health of former DOE defense nuclear facility workers. Consistent with the mandate to DOE from Congress, this project implements a notification, health evaluation (including medical screening) and intervention program for former building and construction trades workers at the DOE Oak Ridge, TN site and the Gaseous Diffusion Plants (GDP) at Portsmouth, OH and Paducah, KY, who may have been exposed to health hazards as a result of work at these sites. Based on congressional language, current workers at GDP's may request

337

Contacts for Integrating Renewable Energy into Federal Construction Projects  

Broader source: Energy.gov [DOE]

Contacts to learn more about integrating renewable energy technologies into Federal construction projects.

338

Plants in constructed wetlands help to treat agricultural processing wastewater  

E-Print Network [OSTI]

Plants in constructed wetlands help to treat agriculturalhas been available to help guide that selection. We

Grismer, Mark E; Shepherd, Heather L

2011-01-01T23:59:59.000Z

339

ADVANCES IN FORCE FIELD TAILORING FOR CONSTRUCTION IN SPACE  

E-Print Network [OSTI]

economy. The complete validation and refinement of the technique for large-scale construction in deep

340

Constructibility review process framework for transportation facilities  

E-Print Network [OSTI]

. 49 5. CRITICAL ISSUES REI. ATED TO CONSTRUCTIBILITY . . . . . 51 5. 1 Questionnaire Results . 5. 2 Observations Regarding Critical Issues. . 6. THE IDEFO MODELING TECHNIQUE 6. 1 Historical Background 6. 2 IDEF Modeling Entities.... . . . . . . . . . . . 6. 3 Structure of IDEFO Model. 6. 4 IDEFO Labeling Conventions. 6. 5 Data Flow. 6. 6 Example . 51 . 62 . 68 . 69 . 70 . 71 73 . 74 7. PROJECT DEVELOPMENT PROCESS. . 7. 1 Source of Information 7. 2 Development of the Project Development...

Liman, Majed

2012-06-07T23:59:59.000Z

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Advanced materials for flexible pipe construction  

SciTech Connect (OSTI)

New materials have been developed for use in the construction of non-bonded flexible pipe for offshore oil and gas production in sever environmental conditions. Internal environmental conditions include high conveyed fluid temperatures with sour and waxy production fluids. External environmental conditions include low water temperatures and water depths of up to 2,000 m. In this paper, the results of test to verify the suitability of materials developed by Wellstream and its vendors specifically for these severe applications is presented.

Kalman, M.D.; Belcher, J.R.; Plaia, J.R. [Wellstream Company, L.P., Panama City, FL (United States). Dept. of Engineering

1995-10-01T23:59:59.000Z

342

Standard information system for construction management  

E-Print Network [OSTI]

of the Internet with public domain from the Extranet used by the partners, and from the Intranet, which is available only to a company' s permanent employees. The Construction Industry Institute (CII) at the University of Texas at Austin has done a... compatibility problems; 5. User-friendliness and clearness of XML documents (Walsh 1998) Virtual Private Networks Virtual Private Networks (VPN) use the Internet to securely link two or more private networks (Intranets) . VPN consist of 'tunnels' created...

Sultanbekov, Kanat A

2012-06-07T23:59:59.000Z

343

The construction of the Browns Bay Vessel  

E-Print Network [OSTI]

INVESTIGATIVE TECHNIQUES. 10 19 The Site. National Historic Sites Service Excavation and Raising of the Vessel Vessel on Display. The Vessel in 1985. 19 20 27 28 Method of Recording III THE CONSTRUCTION OF THE VESSEL 31 36 The Keel 36 The Stem... A flat-bottomed boat being built. 17 9 Forelocked eye-bolts from the midship beam of the Browne Bay Vessel 21 10 Broad arrow stamped in an eye-bolt from the Browns Bay Vessel. . . . . . . . . . . . . . . . . . . . . . . . . . . 22 11 Pulley...

Amer, Christopher Francis

2012-06-07T23:59:59.000Z

344

400A Construction Schedule | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

27-ID and 35-ID 27-ID and 35-ID Past 27-ID and 35-ID Long Range Schedule (pdf) 27-ID and 35-ID Past Construction Past 27-ID and 35-ID Construction Day Activity Impact Week of 06.11.13 35-ID-D panels arrive, 35-ID-C panel installation complete. Start installation of 35-ID-D. -/- Week of 06.13.13 DCS/RIXS Construction Progress Meeting, LOM 438-C010, 9AM -/- Week of 06.18.13 27-ID-A panels arrive -/- Week of 06.25.13 first shipment of 35-ID-E panels arrives -/- Week of 06.03.13 continue installation of 35-ID-C panels, doors, roof and floor trim Low Week of 05.20.13 35-ID-C panels arrive begin installation of 35-ID-C wall and roof panels Low Week of 05.13.13 completion of 35-ID-B roof panels, installation of lead trim, steel capping and door installation. Low Tuesday - 03.05.13

345

Constructing Hydraulic Barriers in Deep Geologic Formations  

SciTech Connect (OSTI)

Many construction methods have been developed to create hydraulic barriers to depths of 30 to 50 meters, but few have been proposed for depths on the order of 500 meters. For these deep hydraulic barriers, most methods are potentially feasible for soil but not for hard rock. In the course of researching methods of isolating large subterranean blocks of oil shale, the authors have developed a wax thermal permeation method for constructing hydraulic barriers in rock to depths of over 500 meters in competent or even fractured rock as well as soil. The technology is similar to freeze wall methods, but produces a permanent barrier; and is potentially applicable in both dry and water saturated formations. Like freeze wall barriers, the wax thermal permeation method utilizes a large number of vertical or horizontal boreholes around the perimeter to be contained. However, instead of cooling the boreholes, they are heated. After heating these boreholes, a specially formulated molten wax based grout is pumped into the boreholes where it seals fractures and also permeates radially outward to form a series of columns of wax-impregnated rock. Rows of overlapping columns can then form a durable hydraulic barrier. These barriers can also be angled above a geologic repository to help prevent influx of water due to atypical rainfall events. Applications of the technique to constructing containment structures around existing shallow waste burial sites and water shutoff for mining are also described. (authors)

Carter, E.E.; Carter, P.E. [Technologies Co, Texas (United States); Cooper, D.C. [Ph.D. Idaho National Laboratory, Idaho Falls, ID (United States)

2008-07-01T23:59:59.000Z

346

Black Hills Energy (Gas) - Residential New Construction Rebate Program |  

Broader source: Energy.gov (indexed) [DOE]

Black Hills Energy (Gas) - Residential New Construction Rebate Black Hills Energy (Gas) - Residential New Construction Rebate Program Black Hills Energy (Gas) - Residential New Construction Rebate Program < Back Eligibility Construction Residential Savings Category Appliances & Electronics Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Other Program Info State Iowa Program Type Utility Rebate Program Rebate Amount Builder Incentive: $800 - $2300 Provider Black Hills Energy Black Hills Energy offers new construction rebates for home builders in the eligible service area. Rebates between $800 and $5,000 are available for a range of efficiency measures incorporated into home construction. Qualifying homes must use natural gas and meet the minimum efficiency

347

CRAD, Nuclear Facility Construction - Structural Steel, May 29, 2009 |  

Broader source: Energy.gov (indexed) [DOE]

Steel, May 29, Steel, May 29, 2009 CRAD, Nuclear Facility Construction - Structural Steel, May 29, 2009 May 29, 2009 Nuclear Facility Construction - Structural Steel (HSS CRAD 64-16, Rev. 0) Nuclear Facility Construction - Structural Steel criteria, review, and approach document, observes construction activities and review records and design documentation to assess the quality of structural steel fabrication and erection and to determine if requirements specified by design basis documents, contracts, and applicable codes and standards have been met. CRAD, Nuclear Facility Construction - Structural Steel, May 29, 2009 More Documents & Publications CRAD, Nuclear Facility Construction - Structural Concrete, May 29, 2009 CRAD, Nuclear Facility Construction - Mechanical Equipment - June 26, 2012

348

Guide to Integrating Renewable Energy in Federal Construction: Training  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Training to someone by E-mail Training to someone by E-mail Share Guide to Integrating Renewable Energy in Federal Construction: Training on Facebook Tweet about Guide to Integrating Renewable Energy in Federal Construction: Training on Twitter Bookmark Guide to Integrating Renewable Energy in Federal Construction: Training on Google Bookmark Guide to Integrating Renewable Energy in Federal Construction: Training on Delicious Rank Guide to Integrating Renewable Energy in Federal Construction: Training on Digg Find More places to share Guide to Integrating Renewable Energy in Federal Construction: Training on AddThis.com... Home Introduction Assessing Renewable Energy Options Planning, Programming, & Budgeting Project Funding Building Design Project Construction Commissioning Operations & Maintenance

349

Guide to Integrating Renewable Energy in Federal Construction: Outreach  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Outreach to someone by E-mail Outreach to someone by E-mail Share Guide to Integrating Renewable Energy in Federal Construction: Outreach on Facebook Tweet about Guide to Integrating Renewable Energy in Federal Construction: Outreach on Twitter Bookmark Guide to Integrating Renewable Energy in Federal Construction: Outreach on Google Bookmark Guide to Integrating Renewable Energy in Federal Construction: Outreach on Delicious Rank Guide to Integrating Renewable Energy in Federal Construction: Outreach on Digg Find More places to share Guide to Integrating Renewable Energy in Federal Construction: Outreach on AddThis.com... Home Introduction Assessing Renewable Energy Options Planning, Programming, & Budgeting Project Funding Building Design Project Construction Commissioning Operations & Maintenance

350

Guide to Integrating Renewable Energy in Federal Construction: Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources to someone by E-mail Resources to someone by E-mail Share Guide to Integrating Renewable Energy in Federal Construction: Resources on Facebook Tweet about Guide to Integrating Renewable Energy in Federal Construction: Resources on Twitter Bookmark Guide to Integrating Renewable Energy in Federal Construction: Resources on Google Bookmark Guide to Integrating Renewable Energy in Federal Construction: Resources on Delicious Rank Guide to Integrating Renewable Energy in Federal Construction: Resources on Digg Find More places to share Guide to Integrating Renewable Energy in Federal Construction: Resources on AddThis.com... Home Introduction Assessing Renewable Energy Options Planning, Programming, & Budgeting Project Funding Building Design Project Construction Commissioning Operations & Maintenance

351

Buildings Energy Data Book: 1.3 Value of Construction and Research  

Buildings Energy Data Book [EERE]

7 7 Buildings Design and Construction Trades, by Year | | | 1980 | 1982 14.4 1990 | 1987 38.4 2000 (4) | 1992 36.3 2005 | 1997 46.6 2006 | 2002 95.4 2007 | 2007 52.4 2008 | 2009 | 2010 | Note(s): Source(s): 1) Does not include industrial building or heavy construction (e.g., dam and bridge building). In 1999, 76% of the employment shown is considered for "production." The entire U.S. construction industry employs an estimated 10 million people, including manufacturing. 2) In 2000, NAHB report having 200,000 members, one-third of which were builders. 3) Excludes homebuilding establishments without payrolls, estimated by NAHB at an additional 210,000 in 1992. 4) NAHB reports that 2,448 full-time jobs in construction and related industries are generated from the construction of every 1,000 single-family homes and 1,030 jobs are created from the construction of every 1,000 multi-

352

Construction of an embankment with a fly and bottom ash mixture: field performance study  

SciTech Connect (OSTI)

Fly ash and bottom ash are coal combustion by-products (CCBPs) that are generated in large quantities throughout the world. It is often economical to dispose ash as mixtures rather than separately; that notwithstanding, only a few studies have been performed to investigate the behavior of fly and bottom ash mixtures, particularly those with high contents of fly ash. Also, there is very limited data available in the literature on the field performance of structures constructed using ash mixtures. This paper describes the construction and the instrumentation of a demonstration embankment built with an ash mixture (60:40 by weight of fly ash:bottom ash) on State Road 641, Terre Haute, Ind. Monitoring of the demonstration embankment was conducted for a period of 1 year from the start of construction of the embankment. The settlement of the embankment stabilized approximately 5 months after the end of its construction. According to horizontal inclinometer readings, the differential settlement at the top of the embankment is about 5 mm. Results from field quality control tests performed during construction of the demonstration embankment and monitoring data from vertical and horizontal inclinometers and settlement plates indicate that the ash mixture investigated can be considered an acceptable embankment construction material.

Yoon, S.; Balunaini, U.; Yildirim, I.Z.; Prezzi, M.; Siddiki, N.Z. [Louisiana Transportation Research Center, Baton Rouge, LA (United States)

2009-06-15T23:59:59.000Z

353

Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report  

SciTech Connect (OSTI)

Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models.

Timothy Shaw; Anthony Baratta; Vaughn Whisker

2005-02-28T23:59:59.000Z

354

Small Employer Quality Jobs 7-Year Cash Incentive (Oklahoma) | Department  

Broader source: Energy.gov (indexed) [DOE]

Employer Quality Jobs 7-Year Cash Incentive (Oklahoma) Employer Quality Jobs 7-Year Cash Incentive (Oklahoma) Small Employer Quality Jobs 7-Year Cash Incentive (Oklahoma) < Back Eligibility Agricultural Commercial Construction Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Home Weatherization Water Solar Wind Program Info State Oklahoma Program Type Grant Program Performance-Based Incentive Provider Oklahoma Department of Commerce This program provides incentive payments to a qualifying small employer (90 employees or less). The payments may reach as high as 5% of new taxable payroll and last for up to seven years. Annual salaries must meet at least

355

Fiscal Year 2012 Congressional Budget  

Office of Energy Efficiency and Renewable Energy (EERE)

The Fiscal Year 2012 Congressional Budget of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

356

One Year Passport to Success  

Broader source: Energy.gov [DOE]

Describes the framework for the Department's on-boarding program for a new employee from day one through their first year.

357

Fiscal Year 2011 Congressional Budget  

Office of Energy Efficiency and Renewable Energy (EERE)

The Fiscal Year 2011 Congressional Budget of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

358

Lasers: The First Fifty Years  

SciTech Connect (OSTI)

This year marks the 50th anniversary of the invention of the laser. The Optical Society of America is publishing this feature issue to celebrate this auspicious birthday.

Boyd, Robert W.; Athale, Ravindra; Onural, Levent; Seka, Wolf

2010-09-01T23:59:59.000Z

359

Yearly  

E-Print Network [OSTI]

In 2009, a new activity was launched under the International Energy Agency Wind Implementing Agreement (IEA Wind) for the small wind sector. The main focus of this activity, called Task 27, is to develop recommended practices for consumer labeling of existing commercial small wind turbines. Participants will also exchange information about the status of the small wind industry in the member countries. This report outlines the status of the small wind sector in 2009 in the countries participating in Task 27. (For more information about IEA Wind and the consumer label developed under Task 27, see www.ieawind.org.)

unknown authors

2009-01-01T23:59:59.000Z

360

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 10 White Female (W F) 2 DIVERSITY TOTAL WORKFORCE GENDER Associate...

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 5 Asian Male 0 Asian Female 0 Hispanic Male 0 Hispanic Female 3 White Male 9 White Female 1 Workforce Diversity Office of the Administrator (NA-1) As of...

362

YEAR  

National Nuclear Security Administration (NNSA)

American Female 2 Asian Male 2 Asian Female 0 Hispanic Male 13 Hispanic Female 17 White Male 37 White Female 17 DIVERSITY GENDER Workforce Diversity Sandia Site Office As of...

363

YEAR  

National Nuclear Security Administration (NNSA)

American Female 6 Asian Male 0 Asian Female 0 Hispanic Male 7 Hispanic Female 18 White Male 40 White Female 25 DIVERSITY GENDER Workforce Diversity As of March 24, 2012 PAY...

364

YEAR  

National Nuclear Security Administration (NNSA)

(AAPI,F) 2 2 0.00% Hispanic Male (H,M) 6 6 0.00% Hispanic Female (H,F) 6 6 0.00% White Male (W,M) 53 50 -5.66% White Female (W,F) 19 13 -31.58% Change DIVERSITY...

365

YEAR  

National Nuclear Security Administration (NNSA)

American Female 39 Asian Male 4 Asian Female 5 Hispanic Male 20 Hispanic Female 50 White Male 57 White Female 84 DIVERSITY Workforce Diversity Associate Administrator for...

366

YEAR  

National Nuclear Security Administration (NNSA)

American Female 43 Asian Male 3 Asian Female 4 Hispanic Male 21 Hispanic Female 47 White Male 61 White Female 92 DIVERSITY Workforce Diversity Associate Administrator for...

367

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 4 White Female (W F) 5 DIVERSITY TOTAL WORKFORCE GENDER Associate...

368

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 25 Hispanic Male (H M) 202 Hispanic Female (H F) 177 White Male (W M) 1244 White Female (W F) 453 Total includes 2425 permanent and 21 temporary...

369

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 1 Hispanic Male (H, M) 5 Hispanic Female (H, F) 6 White Male (W, M) 75 White Female (W, F) 32 TOTAL WORKFORCE GENDER NNSA Production Office...

370

YEAR  

National Nuclear Security Administration (NNSA)

American Female 19 Asian Male 9 Asian Female 5 Hispanic Male 18 Hispanic Female 12 White Male 101 White Female 49 DIVERSITY Workforce Diversity Immediate Office of the Deputy...

371

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 5 Hispanic Female (H F) 3 White Male (W M) 30 White Female (W F) 3 DIVERSITY TOTAL WORKFORCE GENDER Associate...

372

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 3 Hispanic Male (H M) 15 Hispanic Female (H F) 33 White Male (W M) 44 White Female (W F) 68 DIVERSITY TOTAL WORKFORCE GENDER Associate...

373

YEAR  

National Nuclear Security Administration (NNSA)

0 0 0.00% Hispanic Male (H,M) 12 12 0.00% Hispanic Female (H,F) 12 11 -8.33% White Male (W,M) 34 34 0.00% White Female (W,F) 17 16 -5.88% Change DIVERSITY Change...

374

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 5 Hispanic Female (H F) 3 White Male (W M) 26 White Female (W F) 16 DIVERSITY TOTAL WORKFORCE GENDER Livermore Field...

375

YEAR  

National Nuclear Security Administration (NNSA)

American Female 1 Asian Male 9 Asian Female 2 Hispanic Male 75 Hispanic Female 21 White Male 400 White Female 19 DIVERSITY Workforce Diversity Assistant Deputy Administrator...

376

YEAR  

National Nuclear Security Administration (NNSA)

3 2 -33.33% Hispanic Male (H,M) 5 5 0.00% Hispanic Female (H,F) 4 4 0.00% White Male (W,M) 29 26 -10.34% White Female (W,F) 19 16 -15.79% Change DIVERSITY...

377

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 4 Hispanic Female (H F) 7 White Male (W M) 13 White Female (W F) 11 DIVERSITY TOTAL WORKFORCE GENDER Office of General...

378

YEAR  

National Nuclear Security Administration (NNSA)

(AAPI,F) 1 1 0.00% Hispanic Male (H,M) 5 5 0.00% Hispanic Female (H,F) 6 6 0.00% White Male (W,M) 85 71 -16.47% White Female (W,F) 33 30 -9.09% Change DIVERSITY...

379

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 1 Asian Male 2 Asian Female 0 Hispanic Male 4 Hispanic Female 3 White Male 29 White Female 3 Workforce Diversity Associate Administrator for Safety & Health...

380

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 2 Hispanic Male (H, M) 74 Hispanic Female (H, F) 22 White Male (W, M) 393 White Female (W, F) 19 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER...

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

YEAR  

National Nuclear Security Administration (NNSA)

American Female 4 Asian Male 22 Asian Female 4 Hispanic Male 5 Hispanic Female 4 White Male 30 White Female 19 Workforce Diversity Livermore Site Office As of March 24, 2012...

382

YEAR  

National Nuclear Security Administration (NNSA)

American Female 7 Asian Male 3 Asian Female 0 Hispanic Male 23 Hispanic Female 24 White Male 36 White Female 35 DIVERSITY Workforce Diversity Associate Administrator for...

383

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 0 Hispanic Male (H, M) 12 Hispanic Female (H, F) 11 White Male (W, M) 34 White Female (W, F) 16 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER Sandia...

384

YEAR  

National Nuclear Security Administration (NNSA)

Hispanic Male (H,M) 217 207 -4.61% Hispanic Female (H,F) 196 182 -7.14% White Male (W,M) 1318 1271 -3.57% White Female (W,F) 511 463 -9.39% Total includes...

385

YEAR  

National Nuclear Security Administration (NNSA)

American Female 158 Asian Male 79 Asian Female 29 Hispanic Male 220 Hispanic Female 202 White Male 1340 White Female 519 Workforce Diversity National Nuclear Security...

386

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 13 White Female (W F) 5 DIVERSITY TOTAL WORKFORCE GENDER Savannah River...

387

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 76 Hispanic Female (H F) 21 White Male (W M) 401 White Female (W F) 20 DIVERSITY TOTAL WORKFORCE GENDER Assistant Deputy...

388

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 3 Hispanic Female (H F) 5 White Male (W M) 43 White Female (W F) 10 DIVERSITY TOTAL WORKFORCE GENDER Associate...

389

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 12 Hispanic Female (H F) 12 White Male (W M) 34 White Female (W F) 16 DIVERSITY TOTAL WORKFORCE GENDER Sandia Field...

390

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 1 Asian Male 2 Asian Female 0 Hispanic Male 5 Hispanic Female 3 White Male 29 White Female 5 DIVERSITY Workforce Diversity Associate Administrator for...

391

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 0 Hispanic Female 0 White Male 14 White Female 8 DIVERSITY GENDER Workforce Diversity Savannah River Site Office...

392

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 25 Hispanic Female (H F) 25 White Male (W M) 61 White Female (W F) 41 DIVERSITY TOTAL WORKFORCE GENDER Associate...

393

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 2 Hispanic Female (H F) 0 White Male (W M) 154 White Female (W F) 71 * Total numbers are combined. NA-30 total numbers...

394

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 2 Hispanic Female (H F) 6 White Male (W M) 10 White Female (W F) 3 DIVERSITY TOTAL WORKFORCE GENDER Associate...

395

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 0 Hispanic Male (H, M) 1 Hispanic Female (H, F) 0 White Male (W, M) 25 White Female (W, F) 6 TOTAL WORKFORCE GENDER Kansas City Field Office...

396

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 7 Hispanic Male (H M) 7 Hispanic Female (H F) 10 White Male (W M) 82 White Female (W F) 60 DIVERSITY TOTAL WORKFORCE GENDER Deputy...

397

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 5 White Female 6 DIVERSITY Workforce Diversity Associate Administrator of...

398

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 12 Hispanic Female (H F) 7 White Male (W M) 66 White Female (W F) 22 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER Deputy...

399

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 2 Asian Male 3 Asian Female 0 Hispanic Male 5 Hispanic Female 5 White Male 44 White Female 13 Workforce Diversity Pantex Site Office As of March 24, 2012...

400

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 2 Asian Male 1 Asian Female 0 Hispanic Male 0 Hispanic Female 0 White Male 8 White Female 3 DIVERSITY Workforce Diversity As of March 24, 2012 PAY PLAN...

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 2 Hispanic Male (H, M) 5 Hispanic Female (H, F) 4 White Male (W, M) 25 White Female (W, F) 17 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER...

402

YEAR  

National Nuclear Security Administration (NNSA)

2 2 0.00% Hispanic Male (H,M) 76 75 -1.32% Hispanic Female (H,F) 22 21 -4.55% White Male (W,M) 389 400 2.83% White Female (W,F) 21 19 -9.52% Change DIVERSITY...

403

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 2 Hispanic Male (H, M) 6 Hispanic Female (H, F) 6 White Male (W, M) 51 White Female (W, F) 14 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER Nevada...

404

YEAR  

National Nuclear Security Administration (NNSA)

American Female 11 Asian Male 2 Asian Female 1 Hispanic Male 3 Hispanic Female 6 White Male 50 White Female 11 DIVERSITY GENDER Workforce Diversity Associate Administrator...

405

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 6 Hispanic Female (H F) 14 White Male (W M) 39 White Female (W F) 21 DIVERSITY TOTAL WORKFORCE GENDER Associate...

406

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 4 Asian Male 2 Asian Female 3 Hispanic Male 7 Hispanic Female 5 White Male 52 White Female 20 Workforce Diversity Nevada Site Office As of March 24, 2012...

407

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 9 White Male 13 White Female 10 Workforce Diversity Office of General Counsel (NA-GC) As of...

408

YEAR  

National Nuclear Security Administration (NNSA)

American Female 6 Asian Male 0 Asian Female 0 Hispanic Male 7 Hispanic Female 18 White Male 40 White Female 28 DIVERSITY Workforce Diversity Associate Administrator for...

409

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 0 Hispanic Male (H, M) 0 Hispanic Female (H, F) 0 White Male (W, M) 15 White Female (W, F) 7 TOTAL WORKFORCE GENDER Savannah River Field...

410

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 8 Asian Male 3 Asian Female 1 Hispanic Male 1 Hispanic Female 0 White Male 76 White Female 22 DIVERSITY Workforce Diversity Deputy Administrator for Naval...

411

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 5 Asian Male 3 Asian Female 1 Hispanic Male 0 Hispanic Female 1 White Male 46 White Female 22 Workforce Diversity Y-12 Site Office As of March 24, 2012 PAY...

412

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 24 White Female (W F) 6 TOTAL WORKFORCE GENDER Kansas City Field Office As...

413

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 4 Asian Male 0 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 28 White Female 6 Workforce Diversity Kansas City Site Office As of March 24,...

414

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 8 Asian Male 1 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 11 White Female 5 DIVERSITY Workforce Diversity Associate Administrator for...

415

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 3 White Male (W M) 7 White Female (W F) 1 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER National...

416

YEAR  

National Nuclear Security Administration (NNSA)

(AAPI,F) 0 0 0.00% Hispanic Male (H,M) 1 1 0.00% Hispanic Female (H,F) 0 0 0.00% White Male (W,M) 27 25 -7.41% White Female (W,F) 6 6 0.00% Change DIVERSITY Change...

417

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 4 Hispanic Male (H M) 3 Hispanic Female (H F) 6 White Male (W M) 26 White Female (W F) 18 TOTAL WORKFORCE GENDER Associate Administrator for...

418

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 68 White Female (W F) 30 DIVERSITY TOTAL WORKFORCE GENDER NNSA Production...

419

Proton therapy construction projects in the United States  

SciTech Connect (OSTI)

Proton and heavy-ion radiation therapy has been taking place now for 40 years, at many accelerator laboratories around the world, essentially all of these centers built originally for physics research. The high degree of promise shown for using these particles for treating and curing cancer has stimulated the medical community to look seriously at building dedicated accelerator facilities in a hospital setting, where more rapid progress can be made in clinical research, and development of effective treatments with these beams. In the United States, the first such facility, at the Loma Linda University Medical Center, has been in operation now for two years, and is currently treating a total of 35 to 40 patients per day. Two new projects are being designed at present, one at the Massachusetts General Hospital in Boston, Massachusetts, the second a joint project of the Lawrence Berkeley Laboratory and the University of California at Davis Medical Center in Sacramento, California. This paper will discuss accelerator and beam characteristics relevant to the proton-therapy application, and will present performance and operations characteristics for the Loma Linda facility, as well as details of the plans, process and progress towards construction of the new facilities in Boston and Sacramento.

Alonso, J.R.

1992-11-01T23:59:59.000Z

420

Dangerous and severe personality disorder: An investigation of the construct  

Science Journals Connector (OSTI)

Introduction of the construct Dangerous and Severe Personality Disorder (DSPD) by the UK Home Office and Department of Health has provoked strong debate and opposition. Its aims and that of proposed subsequent legislation was to enhance public protection by identifying and detaining a minority of persons with severe personality disorder who pose a high risk of serious sexual/violent offending. The most serious criticism was the ethical implication of allowing indefinite detention of people without criminal convictions. More recently, policy emphasis has shifted towards treatment. 1396 male prisoners serving sentences of 2+years for sexual/violent offenses were prospectively interviewed (personality disorders, psychopathy, and risk) at a mean follow-up of 2years. The prevalence of DSPD was 15%. Significantly more re-offended. Five DSPD offenders would need treatment to prevent one violent act. Based on an estimate of attributable risk, successful treatment of DSPD could reduce violent re-convictions among DSPD offenders by 71% and violent/sexual re-offenses in the prison population by 27%. DSPD criteria correctly identify high risk prisoners but primarily through risk-related demographic features. DSPD does not accurately identify serious sexual/violent re-offenders. The DSPD programme may reduce major violent re-offending if treatment interventions prove effective.

Simone Ullrich; Min Yang; Jeremy Coid

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Venice data > year = 1931:1981  

E-Print Network [OSTI]

:3,] year r1 1 1931 103 2 1932 78 3 1933 121 > attach(venice) ## > plot(year,r1) > lm(r1 ~ year) Call: lm(formula = r1 ~ year) #12;Coefficients: (Intercept) year -989.382 0.567 > lm(r1 ~ year - mean(year)) ## Error differ (found for 'mean(year)') ### > lm(r1 ~ I(year - mean(year))) Call: lm(formula = r1 ~ I(year - mean

Reid, Nancy

422

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network [OSTI]

Charts Income Back http://www.fin.mmu.ac.uk/f18_004b.htm06/07/2004 12:57:08 #12;5 Year Financial Profile - Charts - zoom 5 Year Financial Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_004c.htm06 http://www.fin.mmu.ac.uk/f18_004d.htm06/07/2004 12:57:19 #12;5 Year Financial Profile - Charts - zoom 5

423

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network [OSTI]

Charts Income Back http://www.fin.mmu.ac.uk/f18_008b.htm06/07/2004 12:51:21 #12;5 Year Financial Profile - Charts - zoom 5 Year Financial Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_008c.htm06 http://www.fin.mmu.ac.uk/f18_008d.htm06/07/2004 12:51:31 #12;5 Year Financial Profile - Charts - zoom 5

424

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network [OSTI]

Charts Income Back http://www.fin.mmu.ac.uk/f18_010b.htm06/07/2004 10:57:23 #12;5 Year Financial Profile - Charts - zoom 5 Year Financial Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_010c.htm06 http://www.fin.mmu.ac.uk/f18_010d.htm06/07/2004 12:40:15 #12;5 Year Financial Profile - Charts - zoom 5

425

ASME post construction pressure technology codes  

SciTech Connect (OSTI)

The need to continue to operate pressurized equipment and other facilities in a safe, reliable and cost effective manner has led to the development of many new approaches to in-service inspection, flaw evaluation, and repair. Interest on the part of users, regulatory authorities and others in standardizing these approaches has led to the formation of a new ASME Main Committee on Post Construction under the Board on Pressure Technology Codes and Standards, and a new Division of the Pressure Vessel Research Council on Continued Operation of Equipment. This paper provides a brief overview of these activities.

Sims, J.R. [Exxon Research and Engineering Co., Florham Park, NJ (United States)

1996-12-01T23:59:59.000Z

426

Neural network construction via back-propagation  

SciTech Connect (OSTI)

A method is presented that combines back-propagation with multi-layer neural network construction. Back-propagation is used not only to adjust the weights but also the signal functions. Going from one network to an equivalent one that has additional linear units, the non-linearity of these units and thus their effective presence is then introduced via back-propagation (weight-splitting). The back-propagated error causes the network to include new units in order to minimize the error function. We also show how this formalism allows to escape local minima.

Burwick, T.T.

1994-06-01T23:59:59.000Z

427

Hades: The Construction of a Graphic Novel  

E-Print Network [OSTI]

33 Hades: The Construction of a Graphic Novel Bethany Christiansen Hades is a short graphic novel that reinterprets the sixth chapter of James Joyces Ulysses in light of Dantes Inferno. Descent into a pit, animal symbolism, guilt... acquaintance, Paddy Dignam. As they travel, Blooms convoluted internal narrative touches on subjects such as suicide, the death of his infant son, his estranged wife, and the many forms and consequences of death. I chose to do Hades as a graphic novel...

Christiansen, Bethany

2011-04-01T23:59:59.000Z

428

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network [OSTI]

. Income Expenditure Assets Liabilities & Reserves http://www.fin.mmu.ac.uk/f18_0067.htm06/07/2004 13 Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_006b.htm06/07/2004 13:04:46 #12;5 Year Financial Profile - Charts - Assets 5 Year Financial Profile Charts Assets Back http://www.fin.mmu.ac.uk/f18

429

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network [OSTI]

. Income Expenditure Assets Liabilities Income Breakdown Expenditure Breakdown http://www.fin.mmu.ac.uk/f18 Charts Income Back http://www.fin.mmu.ac.uk/f18_005b.htm06/07/2004 13:00:29 #12;5 Year Financial Profile - Charts - zoom 5 Year Financial Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_005c.htm06

430

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network [OSTI]

. Income Expenditure Assets Liabilities & Reserves http://www.fin.mmu.ac.uk/f18_0079.htm06/07/2004 13 Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_007b.htm06/07/2004 13:05:59 #12;5 Year Financial Profile - Charts - Assets 5 Year Financial Profile Charts Assets Back http://www.fin.mmu.ac.uk/f18

431

Guidance on New Construction under an Energy Savings Performance Contract  

Broader source: Energy.gov (indexed) [DOE]

Guidance on New Construction under an Energy Savings Performance Guidance on New Construction under an Energy Savings Performance Contract November 2013 This document provides guidance on the limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. 2 Guidance on "New" Construction under an Energy Savings Performance Contract Subject: Limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. Summary: In general, an ESPC must be used for the energy efficiency improvement and retrofit of exisiting Federal buildings. An ESPC may be used for the construction of "new" buildings under an ESPC only under limited circumstances:

432

Guidance on New Construction under an Energy Savings Performance Contract  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guidance on New Construction under an Energy Savings Performance Guidance on New Construction under an Energy Savings Performance Contract November 2013 This document provides guidance on the limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. 2 Guidance on "New" Construction under an Energy Savings Performance Contract Subject: Limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. Summary: In general, an ESPC must be used for the energy efficiency improvement and retrofit of exisiting Federal buildings. An ESPC may be used for the construction of "new" buildings under an ESPC only under limited circumstances:

433

FAQS Qualification Card - Construction Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Construction Management Construction Management FAQS Qualification Card - Construction Management A key element for the Department's Technical Qualification Programs is a set of common Functional Area Qualification Standards (FAQS) and associated Job Task Analyses (JTA). These standards are developed for various functional areas of responsibility in the Department, including oversight of safety management programs identified as hazard controls in Documented Safety Analyses (DSA). For each functional area, the FAQS identify the minimum technical competencies and supporting knowledge and skills for a typical qualified individual working in the area. FAQC-ConstructionManagement.docx Description Construction Management Qualification Card More Documents & Publications FAQS Gap Analysis Qualification Card - Construction Management

434

Illumina Unamplified Indexed Library Construction: An Automated Approach  

SciTech Connect (OSTI)

Manual library construction is a limiting factor in Illumina sequencing. Constructing libraries by hand is costly, time-consuming, low-throughput, and ergonomically hazardous, and constructing multiple libraries introduces risk of library failure due to pipetting errors. The ability to construct multiple libraries simultaneously in automated fashion represents significant cost and time savings. Here we present a strategy to construct up to 96 unamplified indexed libraries using Illumina TruSeq reagents and a Biomek FX robotic platform. We also present data to indicate that this library construction method has little or no risk of cross-contamination between samples.

Hack, Christopher A.; Sczyrba, Alexander; Cheng, Jan-Fang

2011-03-21T23:59:59.000Z

435

Guide to Integrating Renewable Energy in Federal Construction: Major  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Major Renovations to someone by E-mail Major Renovations to someone by E-mail Share Guide to Integrating Renewable Energy in Federal Construction: Major Renovations on Facebook Tweet about Guide to Integrating Renewable Energy in Federal Construction: Major Renovations on Twitter Bookmark Guide to Integrating Renewable Energy in Federal Construction: Major Renovations on Google Bookmark Guide to Integrating Renewable Energy in Federal Construction: Major Renovations on Delicious Rank Guide to Integrating Renewable Energy in Federal Construction: Major Renovations on Digg Find More places to share Guide to Integrating Renewable Energy in Federal Construction: Major Renovations on AddThis.com... Home Introduction Assessing Renewable Energy Options Planning, Programming, & Budgeting Project Funding

436

70 Images for 70 Years  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

70 Images for 70 Years 70 Images for 70 Years 70 Images for 70 Years Los Alamos has a proud history and heritage of almost 70 years of science and innovation. The people of the Laboratory work on advanced technologies to provide the best scientific and engineering solutions to many of the nation's most crucial security challenges. Click thumbnails to enlarge. Photos arranged by most recent first, horizontal formats before vertical. See Flickr for more sizes and details. 1938 Hahn and Meitner Fission 1938 Hahn and Meitner Fission 1939 Einstein-Szilard 1939 Einstein-Szilard 1940s Main Guard Gate (671938) 1940s Main Guard Gate (671938) 1940s Security check 1940s Security check 1940 Boys Ranch School hockey on Ashley Pond 1940 Boys Ranch School hockey on Ashley Pond 1942 Fuller Lodge 1942 Fuller Lodge

437

WIPP_Marks_12_Years  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Marks 12 Years of Operations CARLSBAD, N.M., March 28, 2011 - On Saturday, March 26, 2011, the Department of Energy's Waste Isolation Pilot Plant marked another anniversary. It has...

438

Accountability report - fiscal year 1997  

SciTech Connect (OSTI)

This document contains the US NRC`s accountability report for fiscal year 1997. Topics include uses of funds, financial condition, program performance, management accountability, and the audited financial statement.

NONE

1998-04-01T23:59:59.000Z

439

Myths of the Year 2000  

Science Journals Connector (OSTI)

......system monitoring nuclear waste storage recommended the release of radioactive waste several years too early...and 2000. If there is long-term disruption at the end of...few days and building new storage tanks will take time......

M. Thomas

1998-01-01T23:59:59.000Z

440

Chapeau! First-Year French  

E-Print Network [OSTI]

Chapeau! is a first-year college text. Although it may appear, at first glance, o move very fast and introduce a large amount of material early, the vocabulary and grammatical structures that we expect students to control ...

Dinneen, David A.; Kernen, Madeleine

1989-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

NIST 3-Year Programmatic Plan  

E-Print Network [OSTI]

areas critical to the nation's economy.The America COMPETES Act outlines major roles for NIST-year period.NIST will continue to refine this plan as it works with the Administration to address national

442

Federal Energy Management Program: FDA Construction Project Serves as a  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FDA Construction FDA Construction Project Serves as a Super ESPC Model to someone by E-mail Share Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Facebook Tweet about Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Twitter Bookmark Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Google Bookmark Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Delicious Rank Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Digg Find More places to share Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on AddThis.com... Energy Savings Performance Contracts

443

China Nuclear Engineering Construction Corporation CNEC | Open Energy  

Open Energy Info (EERE)

Engineering Construction Corporation CNEC Engineering Construction Corporation CNEC Jump to: navigation, search Name China Nuclear Engineering & Construction Corporation (CNEC) Place Beijing, China Zip 100840 Product CNEC conducts engineering, construction, research and design, finance and trade activities related to nuclear power. References China Nuclear Engineering & Construction Corporation (CNEC)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. China Nuclear Engineering & Construction Corporation (CNEC) is a company located in Beijing, China . References ↑ "China Nuclear Engineering & Construction Corporation (CNEC)" Retrieved from "http://en.openei.org/w/index.php?title=China_Nuclear_Engineering_Construction_Corporation_CNEC&oldid=343517"

444

GRR/Section 6 - Construction Permits Overview | Open Energy Information  

Open Energy Info (EERE)

6 - Construction Permits Overview 6 - Construction Permits Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6 - Construction Permits Overview 06 - ConstructionPermitsOverview.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 06 - ConstructionPermitsOverview.pdf 06 - ConstructionPermitsOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Constructing a geothermal power plant requires numerous permits from Federal, state, and local governments, related to transporting construction materials, encroaching upon Federal and state right-of-ways, demolishing existing structures and building new structures.

445

The design of a panelized roof system for residential construction  

E-Print Network [OSTI]

The cost of housing in the U.S. continues to rise faster than household income. Innovative building materials and construction technologies have the potential to reduce housing construction costs. One strategy to do this ...

Dentz, Jordan Lewis

1991-01-01T23:59:59.000Z

446

About the Design & Construction Collaborative Life Sciences Building & Skourtes Tower  

E-Print Network [OSTI]

About the Design & Construction Collaborative Life Sciences Building & Skourtes Tower With an emphasis on connection, the inter-disciplinary, multi-institutional building's design reflects its. Anticipating LEED Platinum rating, the building incorporated sustainable construction practices, including div

Chapman, Michael S.

447

Application of lean enterprise concept to construction firms in Japan  

E-Print Network [OSTI]

Construction firms in Japan are struggling with the change in construction industry environment and need a new business model to meet the change. On the other hand, Japanese manufacturing companies, especially automobile ...

Taguchi, Hiroshi, 1973-

2004-01-01T23:59:59.000Z

448

SC COLLABORATOR: A SERVICE ORIENTED FRAMEWORK FOR CONSTRUCTION SUPPLY CHAIN  

E-Print Network [OSTI]

, service oriented architecture (SOA) with open source technologies is a desirable computing modelSC COLLABORATOR: A SERVICE ORIENTED FRAMEWORK FOR CONSTRUCTION SUPPLY CHAIN COLLABORATION for construction supply chain collaboration and management, through a prototype service oriented system framework

Stanford University

449

Floodplain and Wetlands Assessment for Construction of a Second...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

associated with the bridge and road construction. Additionally, the possibility of sediment run-off or erosion could occur as a result of a storm during the construction period....

450

National Safety Stand-Down To Prevent Falls In Construction ...  

Broader source: Energy.gov (indexed) [DOE]

Safety Stand-Down To Prevent Falls In Construction National Safety Stand-Down To Prevent Falls In Construction June 2, 2014 - 1:54pm Addthis National Safety Stand-Down To Prevent...

451

Automated crack control analysis for concrete pavement construction  

E-Print Network [OSTI]

The focus of this research is on the control of random cracking in concrete paving by using sawcut notch locations in the early stages of construction. This is a major concern in concrete pavement construction. This research also addresses a...

Jang, Se Hoon

2005-11-01T23:59:59.000Z

452

THE PENNSYLVANIA STATE UNIVERSITY HANKIN CHAIR IN RESIDENTIAL BUILDING CONSTRUCTION  

E-Print Network [OSTI]

research in the areas of residential building design and construction, sustainable buildings, energy issues in residential buildings, lifecycle analysis of buildings and related infrastructure, and sustainable landTHE PENNSYLVANIA STATE UNIVERSITY HANKIN CHAIR IN RESIDENTIAL BUILDING CONSTRUCTION The College

Guiltinan, Mark

453

Consent Order, URS Energy & Construction, Inc.- NCO-2011-02  

Broader source: Energy.gov [DOE]

Issued to URS Energy & Construction, Inc., related to Quality Improvement and Work Control Program Deficiencies associated with Construction of the Sodium Bearing Waste Treatment Project at the Idaho National Laboratory

454

Automated construction technologies : analyses and future development strategies  

E-Print Network [OSTI]

Substandard productivity and the lack of skilled workers in the construction industry have led major corporations all over the world aiming to produce various types of automated construction technologies. During the process, ...

Hoang, Han (Han Mai)

2005-01-01T23:59:59.000Z

455

Master of Architecture Bylaws School of Architecture and Construction Management  

E-Print Network [OSTI]

Master of Architecture Bylaws School of Architecture and Construction Management Washington State University Administrative Home: School of Architecture and Construction Management I. Objectives Degrees offered: Master of Architecture: Professional Accredited Degree. Discipline: Architecture is a general

Collins, Gary S.

456

CDPHE Construction Storm Water Forms | Open Energy Information  

Open Energy Info (EERE)

CDPHE Construction Storm Water Forms Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: CDPHE Construction Storm Water FormsLegal...

457

Construction of transmission lines above valuable standing timber  

Science Journals Connector (OSTI)

Problems with the construction of transmission lines above a forest are examined. Construction of lines above standing timber makes it possible to shorten the length of the route, eliminate the clearing of a cont...

L. O. Aizenberg; E. A. Khvoles

2007-11-01T23:59:59.000Z

458

World Year of Physics 2005  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IMAGE: World Year of Physics 2005 nameplate Berkeley Lab logo Berkeley Lab Celebrates World Year of Physics 2005 Berkeley Lab Web Search Berkeley Lab Phone Book Berkeley Lab A-Z Index Berkeley Lab Privacy and Security Notice IMAGE: World Year of Physics 2005 nameplate Berkeley Lab logo Berkeley Lab Celebrates World Year of Physics 2005 Berkeley Lab Web Search Berkeley Lab Phone Book Berkeley Lab A-Z Index Berkeley Lab Privacy and Security Notice IMAGE: World of Physics graphic Symposia page link Special Events page link Lectures page link Education page link The World Year of Physics is a worldwide celebration of physics and its importance in our everyday lives. Physics not only plays an important role in the development of science and technology but also has a tremendous impact on our society. WYP aims to raise the worldwide awareness of physics and physical science. The United Nations has declared 2005 to be the International Year of Physics. This declaration coincides with the 100th anniversary of physicist

459

Electronic Construction Coordination with AutoCAD  

E-Print Network [OSTI]

and nonspecific to the desired topic. Background of development of AutoCAD AutoCAD is a three dimensional design software package developed by Autodesk. The first version was released in 1982. In the past 25 years, there have been 21 major revisions. John Walker, the founder of Autodesk...

Neal, Christopher

2007-12-14T23:59:59.000Z

460

Energy Information Administration - Commercial Energy Consumption Survey-  

Gasoline and Diesel Fuel Update (EIA)

Table C22. Electricity Consumption and Conditional Energy Intensity by Year Constructed for Non-Mall Buildings, 2003 Total Electricity Consumption (billion kWh) Total Floorspace of Buildings Using Electricity (million square feet) Electricity Energy Intensity (kWh/square foot) 1959 or Before 1960 to 1989 1990 to 2003 1959 or Before 1960 to 1989 1990 to 2003 1959 or Before 1960 to 1989 1990 to 2003 All Buildings* ............................... 155 447 288 17,163 28,766 17,378 9.0 15.5 16.6 Building Floorspace (Square Feet) 1,001 to 5,000 ................................ 23 52 37 2,049 2,668 1,628 11.3 19.6 23.0 5,001 to 10,000 .............................. 15 35 27 1,859 2,854 1,484 8.1 12.2 18.1 10,001 to 25,000 ............................ 27 55 37 3,141 4,907 3,322 8.5 11.3 11.2

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Indoor airPLUS Construction Specifications Version 1 (Rev. 02)  

Broader source: Energy.gov [DOE]

Indoor airPLUS Construction Specifications Version 1 (Rev. 02), November 2013, from the U.S. Environmental Protection Agency.

462

Nuclear Power 2010 Program: Combined Construction and Operating...  

Broader source: Energy.gov (indexed) [DOE]

Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design...

463

Architecture, Engineering and Construction Sustainability Report Biannual Sustainability Report  

E-Print Network [OSTI]

Architecture, Engineering and Construction Sustainability Report i Biannual Sustainability Report Projects $5 Million and Over August 2012 Active Projects

Kamat, Vineet R.

464

Solar Construction Permitting Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Standards Standards Solar Construction Permitting Standards < Back Eligibility Agricultural Commercial General Public/Consumer Industrial Local Government Nonprofit Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Colorado Program Type Solar/Wind Permitting Standards Provider Colorado Energy Office Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the local level and awarded by counties and municipalities. Traditionally, counties and municipalities have been free to assign their own fees for a permit. These fees can vary broadly in size across jurisdictions and in some cases, can be large enough

465

Chapter 15: Commercial New Construction Protocol  

SciTech Connect (OSTI)

This protocol is intended to describe the recommended method when evaluating the whole-building performance of new construction projects in the commercial sector. The protocol focuses on energy conservation measures (ECMs) measures (or packages of measures) where evaluators can best analyze impacts using building simulation. These ECMs typically require the use of calibrated building simulations under Option D of the International Performance Measurement and Verification Protocol. Examples of such measures include Leadership in Energy and Environmental Design building certification, novel and/or efficient heating, ventilation, and air conditioning system designs, and extensive building controls systems. In general, it is best to evaluate any ECM (or set of measures) expected to significantly interact with other systems within the building and with savings sensitive to seasonal variations in weather.

Keates, S.

2014-09-01T23:59:59.000Z

466

Decisions in thesaurus construction and use  

Science Journals Connector (OSTI)

A thesaurus and an ontology provide a set of structured terms, phrases, and metadata, often in a hierarchical arrangement, that may be used to index, search, and mine documents. We describe the decisions that should be made when including a term, deciding whether a term should be subdivided into its subclasses, or determining which of more than one set of possible subclasses should be used. Based on retrospective measurements or estimates of future performance when using thesaurus terms in document ordering, decisions are made so as to maximize performance. These decisions may be used in the automatic construction of a thesaurus. The evaluation of an existing thesaurus is described, consistent with the decision criteria developed here. These kinds of user-focused decision-theoretic techniques may be applied to other hierarchical applications, such as faceted classification systems used in information architecture or the use of hierarchical terms in breadcrumb navigation.

Robert M. Losee

2007-01-01T23:59:59.000Z

467

Buffalo district heating system design and construction  

SciTech Connect (OSTI)

This report addresses the introduction of district heating in Buffalo, NY from feasibility study to implementation. The reemergence of district heating in the US and associated advantages are reviewed. Advanced piping technology which has enabled district heating to compete economically with alternative technologies is summarized. Identification and analysis of the customer heat load considered in downtown Buffalo for the pilot system and future expansion is discussed. Various options for initiating construction of a district heating system were considered as exemplified by the configuration for the pilot system which was selected to serve five downtown buildings. A conceptual plan is presented which permits the system to expand in an economically viable manner. The report concludes with an economic analysis which simulates the operation and expansion of the system. 4 figs., 8 tabs.

Oliker, I.

1987-11-01T23:59:59.000Z

468

Hydrodynamic construction of the electromagnetic field  

E-Print Network [OSTI]

We present an alternative Eulerian hydrodynamic model for the electromagnetic field in which the discrete vector indices in Maxwell\\s equations are replaced by continuous angular freedoms, and develop the corresponding Lagrangian picture in which the fluid particles have rotational and translational freedoms. This enables us to extend to the electromagnetic field the exact method of state construction proposed previously for spin 0 systems, in which the time-dependent wavefunction is computed from a single-valued continuum of deterministic trajectories where two spacetime points are linked by at most a single orbit. The deduction of Maxwell\\s equations from continuum mechanics is achieved by generalizing the spin 0 theory to a general Riemannian manifold from which the electromagnetic construction is extracted as a special case. In particular, the flat-space Maxwell equations are represented as a curved-space Schr\\"odinger equation for a massive system. The Lorentz covariance of the Eulerian field theory is obtained from the non-covariant Lagrangian-coordinate model as a kind of collective effect. The method makes manifest the electromagnetic analogue of the quantum potential that is tacit in Maxwell\\s equations. This implies a novel definition of the \\classical limit\\ of Maxwell\\s equations that differs from geometrical optics. It is shown that Maxwell\\s equations may be obtained by canonical quantization of the classical model. Using the classical trajectories a novel expression is derived for the propagator of the electromagnetic field in the Eulerian picture. The trajectory and propagator methods of solution are illustrated for the case of a light wave.

Peter Holland

2014-10-03T23:59:59.000Z

469

A National Vision for Electricity's Second 100 Years | Department of  

Broader source: Energy.gov (indexed) [DOE]

A National Vision for Electricity's Second 100 Years A National Vision for Electricity's Second 100 Years A National Vision for Electricity's Second 100 Years The purpose of this document is to describe the common vision articulated at the National Electric System Vision meeting. The U.S. Department of Energy will use this vision to help implement President Bush's call for "...modernizing America's electric delivery system" and the 51 recommendations contained in the National Transmission Grid Study. Various stakeholders, including industry practitioners, policy makers, and researchers, will use the vision as the coordinating foundation for actions leading to the construction of a 21st century electric system. The vision will guide the development of the National Electric Delivery Technologies

470

Occupational health and safety specification for construction works contracts  

E-Print Network [OSTI]

Occupational health and safety specification for construction works contracts March 2014 Issued by;#12;Occupational health and safety specification for construction works contracts Contents 1 Scope 1 2 Definitions Health and Safety 1 Specification for Construction Works Contracts Occupational health and safety

Wagner, Stephan

471

ROUX et al. Modelling of a constructed wetland for pesticide  

E-Print Network [OSTI]

ROUX et al. Modelling of a constructed wetland for pesticide mitigation Laetitia ROUX*, Julien chemical pollution. In the agricultural context, pesticide are a real stress for surrounding environment construction. The bibliography's study focus on two subjects: the tracer experiments and the constructed

Boyer, Edmond

472

Multiple perceptual neighborhoods-based feature construction for pattern classification  

Science Journals Connector (OSTI)

Feature construction is much critical to support classification tasks when a combination of the original features carries more discriminative information. However, the construction of features usually implies searching a very large space of possibilities ... Keywords: Classification, Feature construction, Feature selection, Neighborhoods

Guihua Wen, Lijun Jiang, Jun Wen

2014-10-01T23:59:59.000Z

473

Effects of construction and operation of offshore wind farms on seals and small cetaceans.  

Science Journals Connector (OSTI)

Extensive expansion in offshore wind energy takes place these years in European waters with North America following. Concern has been about possible conflicts with marine ecosystems including marine mammals. During the last 10 years several impact studies have been conducted during construction and first years of operation of wind farms in Europe and general conclusions begin to emerge. Pronounced effects (deterrence of animals) during construction have been observed in most cases. In particular pile driving of steel monopiles for foundations has repeatedly been demonstrated to affect porpoise behavior at great distance and effects on seal haul?out behavior has been observed in a single case. Controlled exposure studies have confirmed the results and demonstrated reactions to pile driving impact noise at levels around 140 re. 1 ?Pa. Effects of operation are far less pronounced and range from negative (deterrence) over neutral to positive (attraction). Noise levels from operating turbines are very low however and it is unlikely that deterrence can be attributed to the noise. In general there appears to be little conflict between marine mammals and operating offshore wind farms but there is reason for continued attention to the construction phase in particular regarding pile driving operations.

Jakob Tougaard

2011-01-01T23:59:59.000Z

474

11 Navy sites to save $871,000 yearly | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1 Navy sites to save $871,000 yearly 1 Navy sites to save $871,000 yearly 11 Navy sites to save $871,000 yearly July 13, 2010 - 6:12pm Addthis Joshua DeLung What does this project do? The solar energy systems are expected to generate 9,399 MWh of clean, renewable energy during first full year after construction. The solar and roofing upgrades that will save the Navy $871,935 annually. The process will involve hundreds workers across the projects. 32 buildings in Florida, Mississippi and Texas to receive energy upgrades Up to 275 subcontractors to work on roofing and solar projects 9,399 MWh of energy expected to be generated in first full year after construction The U.S. Navy's Naval Facilities Engineering Command (NAVFAC) Southeast - based in Jacksonville, Fla. - is using $69.3 million in funding from the

475

Berkeley Lab Community Relations: Construction Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LRDP Frequently Asked Questions LRDP Frequently Asked Questions Long-Range Development Plan Berkeley Lab Plans for Next 20 Years Aerial view of Berkeley Lab and San Francisco Bay The Laboratory has prepared its first Long Range Development Plan (LRDP) in 20 years. As outlined in the LRDP, the Lab will develop a safe, efficient, cost effective and operationally flexible infrastructure capable of long-term support of evolving scientific missions. Science drives the Lab's development. LRDPs establish a framework of land-use principles and policies to guide future growth and change through 2025. The plan identifies projections in population, building space, and land uses. This 2006 LRDP also includes an accompanying analysis of environmental impacts, pursuant to the California Environmental Quality Act, and a Final Environmental Impact

476

FY 1987 current fiscal year work plan  

SciTech Connect (OSTI)

This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

Not Available

1986-12-01T23:59:59.000Z

477

Guide to Integrating Renewable Energy in Federal Construction  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Integrating Renewable Energy in Integrating Renewable Energy in Federal Construction Developed by the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), the "Guide to Integrating Renewable Energy into Federal Construction" helps Federal agencies understand renewable energy options, select appropriate types of renewable energy technologies, and integrate these technologies into all phases of new construction or major renovation projects. This PDF is a printed version of the online guide. This guide is structured to address renewable energy considerations at each stage of the construction process. Renewable Energy Project Funding Assessing Renewable Energy Options Planning, Programming, & Budgeting Building Design Operations & Maintenance Project Construction

478

Anaheim Public Utilities - Green Building and New Construction Rebate  

Broader source: Energy.gov (indexed) [DOE]

Anaheim Public Utilities - Green Building and New Construction Anaheim Public Utilities - Green Building and New Construction Rebate Program Anaheim Public Utilities - Green Building and New Construction Rebate Program < Back Eligibility Commercial Construction Industrial Low-Income Residential Multi-Family Residential Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Commercial Heating & Cooling Cooling Construction Design & Remodeling Windows, Doors, & Skylights Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Insulation Maximum Rebate Commercial Green Building: $75,000 Residential Green Building: $100,000 LEED Certification: $30,000 Green Building Rater Incentive: $6,000 Program Info State California Program Type Utility Rebate Program

479

Guide to Integrating Renewable Energy in Federal Construction  

Broader source: Energy.gov (indexed) [DOE]

Integrating Renewable Energy in Integrating Renewable Energy in Federal Construction Developed by the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), the "Guide to Integrating Renewable Energy into Federal Construction" helps Federal agencies understand renewable energy options, select appropriate types of renewable energy technologies, and integrate these technologies into all phases of new construction or major renovation projects. This PDF is a printed version of the online guide. This guide is structured to address renewable energy considerations at each stage of the construction process. Renewable Energy Project Funding Assessing Renewable Energy Options Planning, Programming, & Budgeting Building Design Operations & Maintenance Project Construction

480

University of North Carolina at Charlotte Design and Construction Manual Section 3, Annex B Construction Waste Management  

E-Print Network [OSTI]

does not include burning, incinerating, or thermally destroying waste. Can be conducted on-site (as ­ Construction Waste Management ANNEX B WASTE REDUCTION & RECYCLING GUIDELINES #12;University of North Carolina at Charlotte Design and Construction Manual Section 3, Annex B ­ Construction Waste Management WASTE REDUCTION

Xie,Jiang (Linda)

Note: This page contains sample records for the topic "year constructed floorspace" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Impacts of House Bill 56 on the Construction Economy in Alabama  

E-Print Network [OSTI]

bill, and its impact on the construction economy in Alabama. The study utilized construction employment rates, construction GDP, and construction spending as the major indices detailing the health of the construction economy in Alabama. This research...

Bilbo, David; Escamilla, Edelmiro; Bigelow, Ben F.; Garcia, Jose

482

LNG to the year 2000  

SciTech Connect (OSTI)

By 2000, about 190 MM metric-tpy of LNG will be moving in world trade, with Asia-Pacific as the dominant producer By the year 2000, approximately 190 million metric tons per year of LNG will be moving in worldwide trade. Production of LNG will be spread throughout most of the world, with Asia-Pacific as the dominant producer. LNG will be delivered only to the heavily industrialized areas of North America, Europe and Asia-Pacific. The success of any LNG project will be dependent on its individual economics, market needs, financial planning, and governmental permit processes. We hope industry will be able to put together the LNG projects required to meet the quanitities of production forecast here for the year 2000.

Davenport, S.T.

1984-04-01T23:59:59.000Z

483

Design & Construct New Buildings | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Design & Construct New Buildings Design & Construct New Buildings Design & Construct New Buildings Photo of NREL's Research Support Facility under construction, with two workers straddling I-beams. Establishing and implementing aggressive energy performance goals during the design and construction of new commercial buildings is important to achieving those goals over the lifetime of the building. Energy efficiency measures can be applied in various stages of the design and construction process, including scoping and design, procurement, codes and standards compliance, construction and commissioning. Energy savings through these measures can be significant and will have lasting positive impacts on the overall energy use of the building. For example, using technologies and concepts such as radiant heating and cooling, precast concrete insulated

484

Construction Begins on New Waste Processing Facility | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Construction Begins on New Waste Processing Facility Construction Begins on New Waste Processing Facility Construction Begins on New Waste Processing Facility February 9, 2012 - 12:00pm Addthis Workers construct a new facility that will help Los Alamos National Laboratory accelerate the shipment of transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) in Carlsbad for permanent disposal. Workers construct a new facility that will help Los Alamos National Laboratory accelerate the shipment of transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) in Carlsbad for permanent disposal. Construction has begun on a new facility that will help Los Alamos National Laboratory accelerate the shipment of transuranic (TRU) waste stored in large boxes at Technical Area 54, Area G. Construction has begun on a new facility that will help Los Alamos National

485

CONSTRUCTION CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen  

Broader source: Energy.gov (indexed) [DOE]

CONSTRUCTION CONSTRUCTION CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen Telephone (510) 486-4506 Email dtchen@lbl.gov All Other Specialty Trade Contractors 238990 LAWRENCE LIVERMORE LAB POC Jill Swanson Telephone (925) 423-4535 Email swanson6@llnl.gov All Other Specialty Trade Contractors 238990 COLORADO GOLDEN FIELD OFFICE POC Karen Downs Telephone (720) 356-1269 Email karen.downs@go.doe.gov Industrial Building Construction 236210 Commercial and Institutional Building Construction 236220 Power and Communication Line and Related Structures Construction 237130 Highway, Street, and Bridge Construction 237310 Other Heavy and Civil Engineering Construction 237990 Other Building Equipment Contractors 238290 Other Building Finishing Contractors 238390 Site Preparation Contractors 238910 All Other Specialty Trade Contractors

486

MSA Apparatus Construction for Chemical Equipment Ltd | Open Energy  

Open Energy Info (EERE)

MSA Apparatus Construction for Chemical Equipment Ltd MSA Apparatus Construction for Chemical Equipment Ltd Jump to: navigation, search Name MSA Apparatus Construction for Chemical Equipment Ltd Place United Kingdom Sector Hydro, Hydrogen Product Supplies hydrogen reduction reactors or hydrogenation reactors for polysilicon production. References MSA Apparatus Construction for Chemical Equipment Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. MSA Apparatus Construction for Chemical Equipment Ltd is a company located in United Kingdom . References ↑ "MSA Apparatus Construction for Chemical Equipment Ltd" Retrieved from "http://en.openei.org/w/index.php?title=MSA_Apparatus_Construction_for_Chemical_Equipment_Ltd&oldid=34895

487

Method of constructing a superconducting magnet  

DOE Patents [OSTI]

A superconducting magnet designed to produce magnetic flux densities of the order of 4 to 5 Webers per square meter is constructed by first forming a cable of a plurality of matrixed superconductor wires with each wire of the plurality insulated from each other one. The cable is shaped into a rectangular cross-section and is wound with tape in an open spiral to create cooling channels. Coils are wound in a calculated pattern in saddle shapes to produce desired fields, such as dipoles, quadrupoles, and the like. Wedges are inserted between adjacent cables as needed to maintain substantially radial placement of the long dimensions of cross sections of the cables. After winding, individual strands in each of the cables are brought out to terminals and are interconnected to place all of the strands in series and to maximize the propagation of a quench by alternating conduction from an inner layer to an outer layer and from top half to bottom half as often as possible. Individual layers are separated from others by spiraled aluminum spacers to facilitate cooling. The wound coil is wrapped with an epoxy tape that is cured by heat and then machined to an interference fit with an outer aluminum pipe which is then affixed securely to the assembled coil by heating it to make a shrink fit. In an alternate embodiment, one wire of the cable is made of copper or the like to be heated externally to propagate a quench.

Satti, John A. (Naperville, IL)

1981-01-01T23:59:59.000Z

488

The year that never was  

Science Journals Connector (OSTI)

... of technology for bending the inclinations of their people to that simple goal, that personal liberty would cease to be, remains a nightmare ? one, nevertheless, that will not ... consistently more enlightened now than, say, a year ago, or that the suppression of liberty has by magic been banished from the face of the Earth. On the contrary, ...

1984-01-05T23:59:59.000Z

489

Telecommunications: Comsat Lives Another Year  

Science Journals Connector (OSTI)

... position which it occupies at the centre of the growing web of activity in international telecommunications by satellite. To be sure, the report does say that "the year just ... of the task force set by President Johnson to study the future pattern of domestic telecommunications, but it is hard to see how any government would be able to deny ...

1969-05-17T23:59:59.000Z

490

STUDENT AFFAIRS YEAR 1 ORIENTATION  

E-Print Network [OSTI]

STUDENT AFFAIRS YEAR 1 ORIENTATION Student Affairs Team #12;Objectives: ·Introductions ·Services Offered ·Policies ·Student Disability Services #12;Student Affairs Team: · Assistant Dean of Student/Events Guru: Allison Gherardini · Student Organizations: Tracey Eady · Glue: Benita Patrick, Jean Mc

Finley Jr., Russell L.

491

Nuclear Materials Focus Area Fiscal Year 2002 Mid Year Review  

SciTech Connect (OSTI)

The Nuclear Materials Focus Area (NMFA) held its annual mid-year review on February 12 and 14, 2002, in Santa Fe, New Mexico. The purpose of this review was to examine both the technical aspects and the programmatic aspects of its technology development program. The focus area activities were reviewed by a panel consisting of personnel representing the end users of the technologies, and technical experts in nuclear materials. This year's review was somewhat different than in the past, as the stress was on how well the various projects being managed through the NMFA aligned with the two thrust areas and nine key goals and priorities recently issued by the Deputy Assistant Secretary for DOE's Office of Environmental Management (EM).

Thiel, E.C.; Fuhrman, P.W.

2002-05-30T23:59:59.000Z

492

Nuclear Materials Focus Area Fiscal Year 2002 Mid Year Review  

SciTech Connect (OSTI)

The Nuclear Materials Focus Area (NMFA) held its annual mid-year review on February 12 and 14, 2002, in Santa Fe, New Mexico. The purpose of this review was to examine both the technical aspects and the programmatic aspects of its technology development program. The focus area activities were reviewed by a panel consisting of personnel representing the end users of the technologies, and technical experts in nuclear materials. This year's review was somewhat different than in the past, as the stress was on how well the various projects being managed through the NMFA aligned with the two thrust areas and nine key goals and priorities recently issued by the Deputy Assistant Secretary for DOE's Office of Environmental Management (EM).

Thiel, Elizabeth Chilcote

2002-05-01T23:59:59.000Z

493

Characteristics RSE Column Factor: All Model Years Model Year  

Gasoline and Diesel Fuel Update (EIA)

or 17 Years ... 15.2 0.7 0.9 0.9 3.0 3.8 2.8 1.2 0.9 0.9 15.5 Households Without Children ... 92.2 4.2 5.9 6.5 21.8 21.8 14.2 5.9 5.5 6.4 5.5...

494

Market Impact By 2015, an estimated 40-48% of new nonresidential construction by value will be green,  

E-Print Network [OSTI]

gallons per year 13 . · The industry expects that water-efficiency efforts will decrease energy use by 10.5% of the $14.7 trillion U.S. GDP 3 . This includes all commercial, residential, industrial and infrastructure construction. · With energy efficiency financing having the potential to soar from $20 to $150 billion annually

495

ECOLOGICAL MONITORING AND COMPLIANCE PROGRAM CALENDAR YEAR 2005 REPORT  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the programs activities conducted by Bechtel Nevada (BN) during the Calendar Year 2005. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive and protected/regulated species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Non-Proliferation Test and Evaluation Complex (NPTEC).

BECHTEL NEVADA ECOLOGICAL SERVICES

2006-03-01T23:59:59.000Z

496

Constructing the Beginning: Discourses of Creation Science  

Science Journals Connector (OSTI)

``One is always offering an interpretation of an interpretation.'' So we are admonished by Simon Locke in his book Constructing the Beginning: Discourses of Creation Science. But there are interpretations and there are interpretations, it seems. A spate of books have been published, most on the American side of the Atlantic, which claim to analyze as well as to contribute to the continuing public debate between science and religion. Included in these recent or influential books are Michael Ruse's Darwinism Defended and Robert Pennock's Tower of Babel. While Ruse and Pennock advocate a rationalist approach for interrogating creation science from the philosophical perspective, Simon Locke offers a sociological account to understand the play of science against and alongside religion. Instead of reading creation science as a ``bastard parasite'' (his nomenclature) of both science and creationism la Ruse and instead of reading creation science as a threat to rationality and to all the things we secular readers hold dear, la Pennock, Locke refuses to weigh in on one side or the other. He places emphasis on the way in which creation science authors draw inspiration from the natural sciences as a `cultural resource'. Thus, other genres, such as science fiction, new-age science and even science popularization do the same by using arguments styled in the same way as scientific ones. So, far from being a justification for creation science or yet another diatribe against it, Locke attempts to give a nuanced sociological account of the arguments themselves. Constructing the Beginning is at its best when Locke turns to texts to show two key things. First, sociologists and social theorists have, in a fashion, constructed creation science as a dialectic other to science and have perhaps unduly underscored the pre-eminence of science in their theories of modernity. Second, and in contrast to this dialectical position, discourses produced by creation scientists themselves have heavily relied on the discursive strategies of science. So, according to Locke, we have a dilemma. Social theorists and philosophers tell us that creation science is the opposite of science and that this is a fundamental issue of our time. At the same time, creation science uses the same argument structures and discursive repertoires as science itself. It's kind of like being the fashion editor at Vogue who hypes the different styles of clothing at two leading fashion houses but finds that on the catwalk, the clothes really look the same. And come to think of it, not all that many people read Vogue to tell them what to wear. In order to demonstrate the ways in which creation scientists use science as a discursive resource, Locke analyzes pamphlets and publicity material from British creation science organizations such as the Creation Science Movement. In order to show us the ways in which social theorists overplay the influence of science in modernity, Locke turns to the work of Habermas, Bell and Lyotard. The two chapters where this analysis happens are the richest in the book and leave the reader chewing over the notion that much of the creation science vs. science debate has been overdetermined by sociological descriptions of the debate. In its strongest form, Locke's argument is that the creation/evolution debate continues because scientists and sociologists keep reminding us how important it is for us to reach resolution in this area. However, they have yet to give us crucial evidence against the view that religious arguments and scientific arguments can both exist within our social world and both be useful resources for thinking and talking about contemporary problems. Other chapters contain less novel insights but do synthesize a range of sociological thinking about the public understanding of science. Included in this discussion is a foray into discourse analysis as a method for studying texts, like those included in the creation science and sociology chapters. This foray into discourse analysis is where things begin to go awry. What is discourse analysi

Joan Leach

1999-01-01T23:59:59.000Z

497

Year STB EIA STB EIA  

U.S. Energy Information Administration (EIA) Indexed Site

Release Date: November 16, 2012 Release Date: November 16, 2012 Barge Truck Total delivered cost per short ton Shipments with transportation rates over total shipments Total delivered cost per short ton Shipments with transportation rates over total shipments Year (nominal) (real) (real) (percent) (nominal) (real) (real) (percent) 2008 $6.26 $5.77 $36.50 15.8% 42.3% $6.12 $5.64 $36.36 15.5% 22.2% 2009 $6.23 $5.67 $52.71 10.8% 94.8% $4.90 $4.46 $33.18 13.5% 25.1% 2010 $6.41 $5.77 $50.83 11.4% 96.8% $6.20 $5.59 $36.26 15.4% 38.9% Annual Percent Change First to Last Year 1.2% 0.0% 18.0% - - 0.7% -0.4% -0.1% - - Latest 2 Years 2.9% 1.7% -3.6% - - 26.6% 25.2% 9.3% - - - = No data reported or value not applicable STB Data Source: The Surface Transportation Board's 900-Byte Carload Waybill Sample

498

Earth: 15 Million Years Ago  

E-Print Network [OSTI]

In Einstein's general relativity theory the metric component gxx in the direction of motion (x-direction) of the sun deviates from unity due to a tensor potential caused by the black hole existing around the center of the galaxy. Because the solar system is orbiting around the galactic center at 200 km/s, the theory shows that the Newtonian gravitational potential due to the sun is not quite radial. At the present time, the ecliptic plane is almost perpendicular to the galactic plane, consistent with this modification of the Newtonian gravitational force. The ecliptic plane is assumed to maintain this orientation in the galactic space as it orbits around the galactic center, but the rotational angular momentum of the earth around its own axis can be assumed to be conserved. The earth is between the sun and the galactic center at the summer solstice all the time. As a consequence, the rotational axis of the earth would be parallel to the axis of the orbital rotation of the earth 15 million years ago, if the solar system has been orbiting around the galactic center at 200 km/s. The present theory concludes that the earth did not have seasons 15 million years ago. Therefore, the water on the earth was accumulated near the poles as ice and the sea level was very low. Geological evidence exists that confirms this effect. The resulting global ice-melting started 15 million years ago and is ending now.

Masataka Mizushima

2008-10-13T23:59:59.000Z

499

Guide to Integrating Renewable Energy in Federal Construction: Planning,  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning, Programming, and Budgeting to someone by E-mail Planning, Programming, and Budgeting to someone by E-mail Share Guide to Integrating Renewable Energy in Federal Construction: Planning, Programming, and Budgeting on Facebook Tweet about Guide to Integrating Renewable Energy in Federal Construction: Planning, Programming, and Budgeting on Twitter Bookmark Guide to Integrating Renewable Energy in Federal Construction: Planning, Programming, and Budgeting on Google Bookmark Guide to Integrating Renewable Energy in Federal Construction: Planning, Programming, and Budgeting on Delicious Rank Guide to Integrating Renewable Energy in Federal Construction: Planning, Programming, and Budgeting on Digg Find More places to share Guide to Integrating Renewable Energy in Federal Construction: Planning, Programming, and Budgeting on

500

Weldon Spring Plant, Former Construction Worker Screening Projects |  

Broader source: Energy.gov (indexed) [DOE]

Weldon Spring Plant, Former Construction Worker Screening Projects Weldon Spring Plant, Former Construction Worker Screening Projects Weldon Spring Plant, Former Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Weldon Spring Plant Worker Population Served: Construction workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied