National Library of Energy BETA

Sample records for year constructed floorspace

  1. 1999 Commercial Building Characteristics--Year Constructed Comparison

    U.S. Energy Information Administration (EIA) Indexed Site

    Year Constructed Comparison Percentage of Floorspace and Buildings by Year Constructed, 1999 Percentage of Floorspace and Buildings by Year Constructed, 1999. If having trouble...

  2. Table B8. Year Constructed, Number of Buildings, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    B8. Year Constructed, Number of Buildings, 1999" ,"Number of Buildings (thousand)" ,"All Buildings","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999" "All Buildings ................",4657,419,499,763,665,774,846,690 "Building Floorspace" "(Square Feet)" "1,001 to 5,000

  3. Floorspace

    U.S. Energy Information Administration (EIA) Indexed Site

    ... with Cooling ......",56940,55188,49335,56940,41788,56661,47647 "Buildings with Water Heating .",56478,55154,49850,53232,39678,56011,46938 "Buildings with Cooking ...

  4. Floorspace

    U.S. Energy Information Administration (EIA) Indexed Site

    ......",297,1654,5.6,3.5 "Health Care ......",129,3163,24.6,6 ... Service ......",7.4,9,6.5,"" "Health Care ......",10,6.9,11.4,"" ...

  5. "Table B26. Water-Heating Energy Sources, Floorspace, 1999"

    U.S. Energy Information Administration (EIA) Indexed Site

    6. Water-Heating Energy Sources, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Water Heating","Water-Heating Energy Sources Used ...

  6. Level: National Data; Row: NAICS Codes; Column: Floorspace and Buildings;

    Gasoline and Diesel Fuel Update (EIA)

    9.1 Enclosed Floorspace and Number of Establishment Buildings, 2010; Level: National Data; Row: NAICS Codes; Column: Floorspace and Buildings; Unit: Floorspace Square Footage and Building Counts. Approximate Approximate Average Enclosed Floorspace Average Number Number of All Buildings Enclosed Floorspace of All Buildings of Buildings Onsite NAICS Onsite Establishments(b) per Establishment Onsite per Establishment Code(a) Subsector and Industry (million sq ft) (counts) (sq ft) (counts) (counts)

  7. Table B2. Summary Table: Totals and Medians of Floorspace, Number of Workers,

    U.S. Energy Information Administration (EIA) Indexed Site

    . Summary Table: Totals and Medians of Floorspace, Number of Workers, Hours of Operation, and Age of Building, 1999" ,"All Buildings (thousand)","Total Floorspace (million square feet)","Total Workers in All Buildings (thousand)","Median Square Feet per Building (thousand)","Median Square Feet per Worker","Median Hours per Week","Median Age of Buildings (years)" "All Buildings

  8. "Table B32. Water-Heating Energy Sources, Floorspace for Non...

    U.S. Energy Information Administration (EIA) Indexed Site

    Water-Heating Energy Sources, Floorspace for Non-Mall Buildings, 2003" ,"Total Floorspace (million square feet)" ,"All Buildings*","Buildings with Water Heating","Water-Heating ...

  9. Property:Building/YearConstruction2 | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search This is a property of type Date. Year of construction 2 (Year of construction) Pages using the property "BuildingYearConstruction2" Showing 25 pages using...

  10. Property:Building/YearConstruction1 | Open Energy Information

    Open Energy Info (EERE)

    1 (taxation year) Subproperties This property has the following 1 subproperty: S Sweden Building 05K0004 Pages using the property "BuildingYearConstruction1" Showing 25...

  11. Table B19. Energy End Uses, Number of Buildings and Floorspace, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    9. Energy End Uses, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,,"Total Floorspace (million square feet)" ,"All Buildings","Energy Used For (more than one may apply)",,,,,"All Buildings","Energy Used For (more than one may apply)" ,,"Space Heating","Cooling","Water Heating","Cooking","Manufact-uring",,"Space

  12. Property:Building/YearConstruction | Open Energy Information

    Open Energy Info (EERE)

    YearConstruction" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 2003 + Sweden Building 05K0002 + 1999 + Sweden Building 05K0003 +...

  13. Table HC1.2.2 Living Space Characteristics by Average Floorspace

    U.S. Energy Information Administration (EIA) Indexed Site

    2 Living Space Characteristics by Average Floorspace, " " Per Housing Unit and Per Household Member, 2005" ,,"Average Square Feet" ," Housing Units (millions)" ,,"Per Housing Unit",,,"Per Household Member" "Living Space Characteristics",,"Total1","Heated","Cooled","Total1","Heated","Cooled" "Total",111.1,2033,1618,1031,791,630,401 "Total Floorspace (Square

  14. Table B24. Cooling Energy Sources, Number of Buildings and Floorspace, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    4. Cooling Energy Sources, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Cooling","Cooling Energy Sources (more than one may apply)",,,"All Buildings","All Buildings with Cooling","Cooling Energy Sources (more than one may apply)" ,,,"Electricity","Natural Gas","District

  15. Table B37. Water Heating Equipment, Number of Buildings and Floorspace, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    7. Water Heating Equipment, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Water Heating","Type of Water Heating Equipment",,,"All Buildings","All Buildings with Water Heating","Type of Water Heating Equipment" ,,,"Central-ized System","Distri-buted System","Combination

  16. MOX Three-Year Construction Anniversary | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Three-Year Construction Anniversary | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply

  17. MOX Two-Year Construction Anniversary | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Two-Year Construction Anniversary | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for

  18. "Table HC1.1.3 Housing Unit Characteristics by Average Floorspace--"

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Housing Unit Characteristics by Average Floorspace--" " Single-Family Housing Units and Mobile Homes, 2005" ,,"Single- Family and Mobile Homes (millions)","Average Square Feet per Housing Unit-- Single-Family and Mobile Homes" ," Housing Units (millions)" ,,,"Single-Family Detached",,,"Single-Family Attached",,,"Mobile Homes" "Housing Unit

  19. "Table HC1.2.3 Living Space Characteristics by Average Floorspace--"

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Living Space Characteristics by Average Floorspace--" " Single-Family Housing Units and Mobile Homes, 2005" ,,"Single- Family and Mobile Homes (millions)","Average Square Feet per Housing Unit" ," Housing Units (millions)" ,,,"Single-Family Detached",,,"Single-Family Attached",,,"Mobile Homes" "Housing Unit

  20. Table HC1.1.2 Housing Unit Characteristics by Average Floorspace, 2005

    U.S. Energy Information Administration (EIA) Indexed Site

    2 Housing Unit Characteristics by Average Floorspace, 2005 " ,,"Average Square Feet per--" ," Housing Units (millions)" ,,"Housing Unit",,,"Household Member" "Housing Unit Characteristics",,"Total1","Heated","Cooled","Total","Heated","Cooled" "Total",111.1,2171,1618,1031,845,630,401 "Census Region and Division" "Northeast",20.6,2334,1664,562,911,649,220

  1. Table HC1.2.4 Living Space Characteristics by Average Floorspace--Apartments, 2

    U.S. Energy Information Administration (EIA) Indexed Site

    2.4 Living Space Characteristics by Average Floorspace--Apartments, 2005" ,,,"Average Square Feet per Apartment in a --" ," Housing Units (millions)" ,,,"2 to 4 Unit Building",,,"5 or More Unit Building" ,,"Apartments (millions)" "Living Space Characteristics",,,"Total","Heated","Cooled","Total","Heated","Cooled" "Total",111.1,24.5,1090,902,341,872,780,441

  2. Construction

    Broader source: Energy.gov [DOE]

    Learn about the energy-efficient construction projects that are saving businesses and communities money while creating jobs.

  3. Table HC1-2a. Housing Unit Characteristics by Year of Construction,

    Gasoline and Diesel Fuel Update (EIA)

    2a. Housing Unit Characteristics by Year of Construction, Million U.S. Households, 2001 Housing Unit Characteristics RSE Column Factor: Total Year of Construction RSE Row Factors 1990 to 2001 1 1980 to 1989 1970 to 1979 1960 to 1969 1950 to 1959 1949 or Before 0.5 1.6 1.2 1.0 1.1 1.1 0.8 Total ............................................... 107.0 15.5 18.2 18.8 13.8 14.2 26.6 4.3 Census Region and Division Northeast ...................................... 20.3 1.5 2.4 2.1 2.8 3.0 8.5 8.8 New

  4. Trends in energy use in commercial buildings -- Sixteen years of EIA's commercial buildings energy consumption survey

    SciTech Connect (OSTI)

    Davis, J.; Swenson, A.

    1998-07-01

    The Commercial Buildings Energy Consumption Survey (CBECS) collects basic statistical information on energy consumption and energy-related characteristics of commercial buildings in the US. The first CBECS was conducted in 1979 and the most recent was completed in 1995. Over that period, the number of commercial bindings and total amount of floorspace increased, total consumption remained flat, and total energy intensity declined. By 1995, there were 4.6 million commercial buildings and 58.8 billion square feet of floorspace. The buildings consumed a total of 5.3 quadrillion Btu (site energy), with a total intensity of 90.5 thousand Btu per square foot per year. Electricity consumption exceeded natural gas consumption (2.6 quadrillion and 1.9 quadrillion Btu, respectively). In 1995, the two major users of energy were space heating (1.7 quadrillion Btu) and lighting (1.2 quadrillion Btu). Over the period 1979 to 1995, natural gas intensity declined from 71.4 thousand to 51.0 thousand Btu per square foot per year. Electricity intensity did not show a similar decline (44.2 thousand Btu per square foot in 1979 and 45.7 thousand Btu per square foot in 1995). Two types of commercial buildings, office buildings and mercantile and service buildings, were the largest consumers of energy in 1995 (2.0 quadrillion Btu, 38% of total consumption). Three building types, health care, food service, and food sales, had significantly higher energy intensities. Buildings constructed since 1970 accounted for half of total consumption and a majority (59%) of total electricity consumption.

  5. Consumption

    U.S. Energy Information Administration (EIA) Indexed Site

    . Electricity Consumption and Conditional Energy Intensity by Year Constructed for Non-Mall Buildings, 2003" ,"Total Electricity Consumption (billion kWh)",,,"Total Floorspace of...

  6. Consumption

    U.S. Energy Information Administration (EIA) Indexed Site

    4. Electricity Consumption and Conditional Energy Intensity by Year Constructed, 1999" ,"Total Electricity Consumption (billion kWh)",,,"Total Floorspace of Buildings Using...

  7. Consumption

    U.S. Energy Information Administration (EIA) Indexed Site

    A. Electricity Consumption and Conditional Energy Intensity by Year Constructed for All Buildings, 2003" ,"Total Electricity Consumption (billion kWh)",,,"Total Floorspace of...

  8. Energy Information Administration - Commercial Energy Consumption...

    Gasoline and Diesel Fuel Update (EIA)

    A. Consumption and Gross Energy Intensity by Year Constructed for Sum of Major Fuels for All Buildings, 2003 Sum of Major Fuel Consumption (trillion Btu) Total Floorspace of...

  9. Energy Information Administration - Commercial Energy Consumption...

    Gasoline and Diesel Fuel Update (EIA)

    2A. Natural Gas Consumption and Conditional Energy Intensity by Year Constructed for All Buildings, 2003 Total Natural Gas Consumption (billion cubic feet) Total Floorspace of...

  10. Energy Information Administration - Commercial Energy Consumption...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    2A. Electricity Consumption and Conditional Energy Intensity by Year Constructed for All Buildings, 2003 Total Electricity Consumption (billion kWh) Total Floorspace of Buildings...

  11. Buildings","Year Constructed"

    U.S. Energy Information Administration (EIA) Indexed Site

    ... with Cooling ......",58474,2911,4383,7601,9325,11050,12849,10355 "Buildings with Water Heating .",56115,3130,4644,7154,9421,10182,12137,9446 "Buildings with Cooking ...

  12. Buildings*","Year Constructed"

    U.S. Energy Information Administration (EIA) Indexed Site

    .........",297,32,34,30,"Q",46,46,66,"Q" "Health Care ......",129,"Q",10,25,10...,24.9,21.5,23.9,28.2,16.8,16.7,14.6,25.5 "Health Care ......",10,76.5,46.7,27....

  13. Buildings*","Year Constructed"

    U.S. Energy Information Administration (EIA) Indexed Site

    .....",1654,281,138,194,"Q",227,182,327,"Q" "Health Care ......",3163,"Q",203,445...,34.7,20.3,35.3,28.9,19.4,21.4,19.8,30.9 "Health Care ......",6.9,38.8,30.1,33...

  14. "Table A7. Enclosed Floorspace and Conditioned Floorspace...

    U.S. Energy Information Administration (EIA) Indexed Site

    , 20,"Food and Kindred Products",1082.6,14698,80.8,666.9,61.6,1.9 2011," Meat Packing Plants",43.5,759,65,33.6,77.1,3 2033," Canned Fruits and Vegetables",70,531,134...

  15. YEAR

    National Nuclear Security Administration (NNSA)

    69 YEAR 2014 Males 34 Females 35 YEAR 2014 SES 5 EJEK 1 EN 05 8 EN 04 5 NN (Engineering) 27 NQ (ProfTechAdmin) 22 NU (TechAdmin Support) 1 YEAR 2014 American Indian Alaska...

  16. YEAR

    National Nuclear Security Administration (NNSA)

    42 YEAR 2014 Males 36 Females 6 PAY PLAN YEAR 2014 SES 2 EJEK 5 EN 05 7 EN 04 6 EN 03 1 NN (Engineering) 15 NQ (ProfTechAdmin) 6 YEAR 2014 American Indian Alaska Native Male...

  17. YEAR

    National Nuclear Security Administration (NNSA)

    4 YEAR 2012 Males 65 Females 29 YEAR 2012 SES 3 EJEK 5 EN 04 3 NN (Engineering) 21 NQ (ProfTechAdmin) 61 NU (TechAdmin Support) 1 YEAR 2012 American Indian Male 0 American...

  18. YEAR

    National Nuclear Security Administration (NNSA)

    4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJEK 1 EN 03 1 NN (Engineering) 3 NQ (ProfTechAdmin) 31 NU (TechAdmin Support) 5 YEAR 2011 American Indian Male 0 American...

  19. YEAR

    National Nuclear Security Administration (NNSA)

    92 YEAR 2012 Males 52 Females 40 YEAR 2012 SES 1 EJEK 7 EN 04 13 EN 03 1 NN (Engineering) 27 NQ (ProfTechAdmin) 38 NU (TechAdmin Support) 5 YEAR 2012 American Indian Male 0...

  20. YEAR

    National Nuclear Security Administration (NNSA)

    558 YEAR 2013 Males 512 Females 46 YEAR 2013 SES 2 EJEK 2 EN 04 1 NN (Engineering) 11 NQ (ProfTechAdmin) 220 NU (TechAdmin Support) 1 NV (Nuc Mat Courier) 321 YEAR 2013...

  1. YEAR

    National Nuclear Security Administration (NNSA)

    11 YEAR 2012 Males 78 Females 33 YEAR 2012 SES 2 EJEK 9 EN 05 1 EN 04 33 NN (Engineering) 32 NQ (ProfTechAdmin) 31 NU (TechAdmin Support) 3 YEAR 2012 American Indian Male 2...

  2. YEAR

    National Nuclear Security Administration (NNSA)

    300 YEAR 2011 Males 109 Females 191 YEAR 2011 SES 9 EJEK 1 NN (Engineering) 2 NQ (ProfTechAdmin) 203 NU (TechAdmin Support) 38 NF (Future Ldrs) 47 YEAR 2011 American Indian...

  3. YEAR

    National Nuclear Security Administration (NNSA)

    02 YEAR 2011 Males 48 Females 54 YEAR 2011 SES 5 EJEK 1 NN (Engineering) 13 NQ (ProfTechAdmin) 80 NU (TechAdmin Support) 3 YEAR 2011 American Indian Male 0 American Indian...

  4. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2013 Males 27 Females 11 YEAR 2013 SES 1 EN 05 1 EN 04 11 NN (Engineering) 8 NQ (ProfTechAdmin) 15 NU (TechAdmin Support) 2 YEAR 2013 American Indian Alaska Native Male...

  5. YEAR

    National Nuclear Security Administration (NNSA)

    31 YEAR 2013 Males 20 Females 11 YEAR 2013 SES 2 EN 04 4 NN (Engineering) 12 NQ (ProfTechAdmin) 12 NU (TechAdmin Support) 1 YEAR 2013 American Indian Alaska Native Male (AIAN,...

  6. YEAR

    National Nuclear Security Administration (NNSA)

    16 YEAR 2012 Males 84 Females 32 YEAR 2012 SES 26 EJEK 2 EN 05 9 NN (Engineering) 39 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 10 YEAR 2012 American Indian Male 0 American...

  7. YEAR

    National Nuclear Security Administration (NNSA)

    34 YEAR 2012 Males 66 Females 68 YEAR 2012 SES 6 NN (Engineering) 15 NQ (ProfTechAdmin) 110 NU (TechAdmin Support) 3 YEAR 2012 American Indian Male 1 American Indian Female 2...

  8. YEAR

    National Nuclear Security Administration (NNSA)

    86 YEAR 2012 Males 103 Females 183 YEAR 2012 SES 7 EJEK 1 NN (Engineering) 1 NQ (ProfTechAdmin) 202 NU (TechAdmin Support) 30 NF (Future Ldrs) 45 YEAR 2012 American Indian Male...

  9. YEAR

    National Nuclear Security Administration (NNSA)

    80 YEAR 2012 Males 51 Females 29 YEAR 2012 SES 1 EJEK 22 EN 04 21 NN (Engineering) 14 NQ (ProfTechAdmin) 21 NU (TechAdmin Support) 1 YEAR 2012 American Indian Male 0 American...

  10. YEAR

    National Nuclear Security Administration (NNSA)

    1 YEAR 2012 Males 30 Females 11 YEAR 2012 SES 1 EN 05 1 EN 04 11 NN (Engineering) 9 NQ (ProfTechAdmin) 17 NU (TechAdmin Support) 2 YEAR 2012 American Indian Male 0 American...

  11. YEAR

    National Nuclear Security Administration (NNSA)

    96 YEAR 2013 Males 69 Females 27 YEAR 2013 SES 1 EJEK 9 EN 04 27 NN (Engineering) 26 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 3 YEAR 2013 American Indian Alaska Native Male...

  12. YEAR

    National Nuclear Security Administration (NNSA)

    31 YEAR 2012 Males 19 Females 12 YEAR 2012 SES 2 EN 04 4 NN (Engineering) 12 NQ (ProfTechAdmin) 12 NU (TechAdmin Support) 1 YEAR 2012 American Indian Male 0 American Indian...

  13. YEAR

    National Nuclear Security Administration (NNSA)

    0 YEAR 2013 Males 48 Females 32 YEAR 2013 SES 2 EJEK 7 EN 04 11 EN 03 1 NN (Engineering) 23 NQ (ProfTechAdmin) 33 NU (TechAdmin Support) 3 YEAR 2013 American Indian Alaska...

  14. YEAR

    National Nuclear Security Administration (NNSA)

    40 YEAR 2011 Males 68 Females 72 YEAR 2011 SES 5 EJEK 1 NN (Engineering) 16 NQ (ProfTechAdmin) 115 NU (TechAdmin Support) 3 YEAR 2011 American Indian Male 1 American Indian...

  15. YEAR

    National Nuclear Security Administration (NNSA)

    00 YEAR 2012 Males 48 Females 52 YEAR 2012 SES 5 EJEK 1 NN (Engineering) 11 NQ (ProfTechAdmin) 80 NU (TechAdmin Support) 3 YEAR 2012 American Indian Male 0 American Indian...

  16. YEAR

    National Nuclear Security Administration (NNSA)

    137 YEAR 2013 Males 90 Females 47 YEAR 2013 SES 2 SL 1 EJEK 30 EN 04 30 EN 03 2 NN (Engineering) 23 NQ (ProfTechAdmin) 45 NU (TechAdmin Support) 4 YEAR 2013 American Indian...

  17. YEAR

    National Nuclear Security Administration (NNSA)

    of Employees 14 GENDER YEAR 2012 Males 9 Females 5 YEAR 2012 SES 2 EJEK 2 NN (Engineering) 4 NQ (ProfTechAdmin) 6 YEAR 2012 American Indian Male 0 American Indian Female 0...

  18. YEAR

    National Nuclear Security Administration (NNSA)

    3 YEAR 2012 Males 21 Females 22 YEAR 2012 SES 3 EJEK 1 EN 03 1 NN (Engineering) 3 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 5 YEAR 2012 American Indian Male 0 American...

  19. YEAR

    National Nuclear Security Administration (NNSA)

    Males 139 Females 88 YEAR 2012 SES 13 EX 1 EJEK 8 EN 05 23 EN 04 20 EN 03 2 NN (Engineering) 91 NQ (ProfTechAdmin) 62 NU (TechAdmin Support) 7 YEAR 2012 American Indian...

  20. YEAR

    National Nuclear Security Administration (NNSA)

    563 YEAR 2012 Males 518 Females 45 YEAR 2012 SES 1 EJEK 2 EN 04 1 EN 03 1 NN (Engineering) 12 NQ (ProfTechAdmin) 209 NU (TechAdmin Support) 2 NV (Nuc Mat Courier) 335 YEAR 2012...

  1. YEAR

    National Nuclear Security Administration (NNSA)

    7 YEAR 2012 Males 64 Females 33 YEAR 2012 SES 2 EJEK 3 EN 05 1 EN 04 30 EN 03 1 NN (Engineering) 26 NQ (ProfTechAdmin) 32 NU (TechAdmin Support) 2 YEAR 2012 American Indian...

  2. YEAR

    National Nuclear Security Administration (NNSA)

    4 YEAR 2012 Males 37 Females 7 YEAR 2012 SES 1 EJEK 6 EN 05 5 EN 04 7 EN 03 1 NN (Engineering) 17 NQ (ProfTechAdmin) 6 NU (TechAdmin Support) 1 YEAR 2012 American Indian Male 2...

  3. YEAR

    National Nuclear Security Administration (NNSA)

    7 YEAR 2011 Males 38 Females 9 YEAR 2011 SES 1 EJEK 6 EN 05 5 EN 04 7 EN 03 1 NN (Engineering) 19 NQ (ProfTechAdmin) 7 NU (TechAdmin Support) 1 YEAR 2011 American Indian Male 2...

  4. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2013 Males 62 Females 26 YEAR 2013 SES 1 EJEK 3 EN 05 1 EN 04 28 EN 03 1 NN (Engineering) 25 NQ (ProfTechAdmin) 27 NU (TechAdmin Support) 2 YEAR 2013 American Indian...

  5. YEAR

    National Nuclear Security Administration (NNSA)

    6 YEAR 2012 Males 64 Females 32 YEAR 2012 SES 1 EJEK 5 EN 05 3 EN 04 23 EN 03 9 NN (Engineering) 18 NQ (ProfTechAdmin) 33 NU (TechAdmin Support) 4 YEAR 2012 American Indian...

  6. YEAR

    National Nuclear Security Administration (NNSA)

    5 YEAR 2013 Males 58 Females 27 YEAR 2013 SES 1 EJEK 4 EN 05 3 EN 04 21 EN 03 8 NN (Engineering) 16 NQ (ProfTechAdmin) 28 NU (TechAdmin Support) 4 YEAR 2013 American Indian...

  7. YEAR

    National Nuclear Security Administration (NNSA)

    78 YEAR 2012 Males 57 Females 21 YEAR 2012 SES 2 SL 1 EJEK 12 EN 04 21 EN 03 2 NN (Engineering) 12 NQ (ProfTechAdmin) 24 NU (TechAdmin Support) 4 YEAR 2012 American Indian Male...

  8. YEAR

    National Nuclear Security Administration (NNSA)

    2012 Males 149 Females 115 YEAR 2012 SES 17 EX 1 EJEK 7 EN 05 2 EN 04 9 EN 03 2 NN (Engineering) 56 NQ (ProfTechAdmin) 165 NU (TechAdmin Support) 4 GS 13 1 YEAR 2012 American...

  9. YEAR

    National Nuclear Security Administration (NNSA)

    5 YEAR 2014 Males 61 Females 24 PAY PLAN YEAR 2014 SES 1 EJ/EK 8 EN 04 22 NN (Engineering) 23 NQ (Prof/Tech/Admin) 28 NU (Tech/Admin Support) 3 YEAR 2014 American Indian Alaska Native Male (AIAN M) 2 American Indian Alaskan Native Female (AIAN F) 3 African American Male (AA M) 0 African American Female (AA F) 0 Asian American Pacific Islander Male (AAPI M) 3 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 13 Hispanic Female (H F) 10 White Male (W M) 43 White Female (W F) 11

  10. YEAR

    National Nuclear Security Administration (NNSA)

    2 YEAR 2014 Males 57 Females 25 PAY PLAN YEAR 2014 SES 3 EJ/EK 4 EN 04 2 NN (Engineering) 20 NQ (Prof/Tech/Admin) 53 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 9 African American Female (AA F) 9 Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 3 Hispanic Female (H F) 5 White Male (W M) 43 White Female (W F) 10 DIVERSITY TOTAL WORKFORCE

  11. YEAR

    National Nuclear Security Administration (NNSA)

    93 YEAR 2014 Males 50 Females 43 PAY PLAN YEAR 2014 EJ/EK 3 NN (Engineering) 13 NQ (Prof/Tech/Admin) 74 NU (Tech/Admin Support) 3 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 2 African American Male (AA M) 5 African American Female (AA F) 6 Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 6 Hispanic Female (H F) 14 White Male (W M) 39 White Female (W F) 21 DIVERSITY

  12. YEAR

    National Nuclear Security Administration (NNSA)

    YEAR 2014 Males 11 Females 2 PAY PLAN YEAR 2014 SES 2 EJ/EK 1 EN 04 1 NN (Engineering) 5 NQ (Prof/Tech/Admin) 4 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 0 African American Female (AA F) 0 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 10 White Female (W F) 2 DIVERSITY TOTAL WORKFORCE GENDER

  13. YEAR

    National Nuclear Security Administration (NNSA)

    9 YEAR 2014 Males 9 Females 10 YEAR 2014 SES 7 ED 1 EJ/EK 1 EN 05 1 NQ (Prof/Tech/Admin) 8 NU (Tech/Admin Support) 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 1 African American Female (AA F) 5 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 3 White Male (W M) 7 White Female (W F) 1 PAY PLAN DIVERSITY TOTAL

  14. YEAR

    National Nuclear Security Administration (NNSA)

    5 YEAR 2014 Males 92 Females 43 YEAR 2014 SES 8 EX 1 EJ/EK 4 EN 05 9 EN 04 12 EN 03 2 NN (Engineering) 57 NQ (Prof/Tech/Admin) 42 YEAR 2014 American Indian Alaska Native Male (AIAN M) 1 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 9 African American Female (AA F) 11 Asian American Pacific Islander Male (AAPI M) 4 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 12 Hispanic Female (H F) 7 White Male (W M) 66 White Female (W F) 22 PAY PLAN

  15. YEAR

    National Nuclear Security Administration (NNSA)

    563 YEAR 2014 Males 517 Females 46 PAY PLAN YEAR 2014 SES 2 EJ/EK 2 EN 04 1 NN (Engineering) 11 NQ (Prof/Tech/Admin) 218 NU (Tech/Admin Support) 2 NV (Nuc Mat Courier) 327 YEAR 2014 American Indian Alaska Native Male (AIAN M) 14 American Indian Alaskan Native Female (AIAN F) 2 African American Male (AA M) 18 African American Female (AA F) 1 Asian American Pacific Islander Male (AAPI M) 8 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 76 Hispanic Female (H F) 21 White Male

  16. YEAR

    National Nuclear Security Administration (NNSA)

    89 YEAR 2014 Males 98 Females 91 PAY PLAN YEAR 2014 SES 14 EX 1 EJ/EK 3 EN 05 1 EN 04 4 EN 03 1 NN (Engineering) 32 NQ (Prof/Tech/Admin) 130 NU (Tech/Admin Support) 2 GS 15 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 1 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 5 African American Female (AA F) 14 Asian American Pacific Islander Male (AAPI M) 3 Asian American Pacific Islander Female (AAPI F) 7 Hispanic Male (H M) 7 Hispanic Female (H F) 10 White Male

  17. YEAR

    National Nuclear Security Administration (NNSA)

    43 YEAR 2014 Males 162 Females 81 PAY PLAN YEAR 2014 SES 26 EJ/EK 3 EN 05 7 NN (Engineering) 77 NQ (Prof/Tech/Admin) 108 NU (Tech/Admin Support) 22 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 5 African American Female (AA F) 9 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 2 Hispanic Female (H F) 0 White Male (W M) 154 White Female (W F)

  18. YEAR

    National Nuclear Security Administration (NNSA)

    74 YEAR 2014 Males 96 Females 78 PAY PLAN YEAR 2014 SES 8 EJ/EK 4 EN 04 11 EN 03 1 NN (Engineering) 34 NQ (Prof/Tech/Admin) 113 NU (Tech/Admin Support) 3 YEAR 2014 American Indian Alaska Native Male (AIAN M) 2 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 3 African American Female (AA F) 11 Asian American Pacific Islander Male (AAPI M) 5 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 25 Hispanic Female (H F) 25 White Male (W M) 61 White

  19. YEAR

    National Nuclear Security Administration (NNSA)

    4 YEAR 2014 Males 7 Females 7 PAY PLAN YEAR 2014 SES 1 NQ (Prof/Tech/Admin) 7 GS 15 1 GS 14 2 GS 13 2 GS 10 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 3 African American Female (AA F) 2 Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 4 White Female (W F) 5 DIVERSITY TOTAL WORKFORCE GENDER

  20. YEAR

    National Nuclear Security Administration (NNSA)

    16 YEAR 2014 Males 72 Females 144 PAY PLAN YEAR 2014 SES 8 EJ/EK 1 NQ (Prof/Tech/Admin) 198 NU (Tech/Admin Support) 9 YEAR 2014 American Indian Alaska Native Male (AIAN M) 2 American Indian Alaskan Native Female (AIAN F) 2 African American Male (AA M) 10 African American Female (AA F) 38 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 3 Hispanic Male (H M) 15 Hispanic Female (H F) 33 White Male (W M) 44 White Female (W F) 68 DIVERSITY TOTAL

  1. YEAR

    National Nuclear Security Administration (NNSA)

    26 YEAR 2014 Males 81 Females 45 PAY PLAN YEAR 2014 SES 1 SL 1 EJ/EK 25 EN 04 26 EN 03 2 NN (Engineering) 23 NQ (Prof/Tech/Admin) 44 NU (Tech/Admin Support) 4 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 3 African American Female (AA F) 7 Asian American Pacific Islander Male (AAPI M) 4 Asian American Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 68 White

  2. YEAR

    National Nuclear Security Administration (NNSA)

    1 YEAR 2014 Males 48 Females 33 PAY PLAN YEAR 2014 SES 1 EJ/EK 8 EN 04 10 EN 03 1 NN (Engineering) 27 NQ (Prof/Tech/Admin) 29 NU (Tech/Admin Support) 5 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 3 African American Male (AA M) 0 African American Female (AA F) 2 Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 12 Hispanic Female (H F) 12 White Male (W M) 34 White Female

  3. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2014 Males 18 Females 10 PAY PLAN YEAR 2014 SES 1 EN 05 1 EN 04 4 NN (Engineering) 12 NQ (Prof/Tech/Admin) 9 NU (Tech/Admin Support) 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 4 African American Female (AA F) 4 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 13 White Female (W F) 5

  4. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2014 Males 18 Females 20 PAY PLAN YEAR 2014 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 28 NU (Tech/Admin Support) 2 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 1 African American Female (AA F) 1 Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 4 Hispanic Female (H F) 7 White Male (W M) 13 White Female (W F) 11

  5. YEAR

    National Nuclear Security Administration (NNSA)

    25 Females 10 YEAR 2014 SES 1 EN 04 11 NN (Engineering) 8 NQ (Prof/Tech/Admin) 13 NU (Tech/Admin Support) 2 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 1 African American Female (AA F) 3 Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 24 White Female (W F) 6 TOTAL WORKFORCE GENDER Kansas City

  6. YEAR

    National Nuclear Security Administration (NNSA)

    9 Females 24 PAY PLAN YEAR 2014 SES 1 EJ/EK 4 EN 05 3 EN 04 22 EN 03 8 NN (Engineering) 15 NQ (Prof/Tech/Admin) 27 NU (Tech/Admin Support) 3 YEAR 2014 American Indian Alaska Native Male (AIAN M) 2 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 5 African American Female (AA F) 2 Asian American Pacific Islander Male (AAPI M) 21 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 5 Hispanic Female (H F) 3 White Male (W M) 26 White Female (W F) 16

  7. YEAR

    National Nuclear Security Administration (NNSA)

    17 Females 18 PAY PLAN YEAR 2014 SES 1 EJ/EK 3 NQ (Prof/Tech/Admin) 30 NU (Tech/Admin Support) 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 1 American Indian Alaskan Native Female (AIAN F) 2 African American Male (AA M) 3 African American Female (AA F) 7 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 2 Hispanic Female (H F) 6 White Male (W M) 10 White Female (W F) 3 DIVERSITY TOTAL WORKFORCE GENDER Associate

  8. YEAR

    National Nuclear Security Administration (NNSA)

    8 Females 25 PAY PLAN YEAR 2014 SES 1 EJ/EK 3 EN 05 1 EN 04 25 EN 03 1 NN (Engineering) 25 NQ (Prof/Tech/Admin) 25 NU (Tech/Admin Support) 2 YEAR 2014 American Indian Alaska Native Male (AIAN M) 1 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 3 African American Female (AA F) 3 Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 46 White Female (W F) 13

  9. YEAR

    National Nuclear Security Administration (NNSA)

    -9.09% YEAR 2012 2013 SES 1 1 0.00% EN 05 1 1 0.00% EN 04 11 11 0.00% NN (Engineering) 8 8 0.00% NQ (ProfTechAdmin) 17 14 -17.65% NU (TechAdmin Support) 2 2...

  10. YEAR

    National Nuclear Security Administration (NNSA)

    Females 863 YEAR 2013 SES 102 EX 3 SL 1 EJEK 89 EN 05 41 EN 04 170 EN 03 18 NN (Engineering) 448 NQ (ProfTechAdmin) 1249 NU (TechAdmin Support) 76 NV (Nuc Mat Courier) 321...

  11. YEAR

    National Nuclear Security Administration (NNSA)

    Females 942 YEAR 2012 SES 108 EX 4 SL 1 EJEK 96 EN 05 45 EN 04 196 EN 03 20 NN (Engineering) 452 NQ (ProfTechAdmin) 1291 NU (TechAdmin Support) 106 NV (Nuc Mat Courier) 335...

  12. YEAR

    National Nuclear Security Administration (NNSA)

    YEAR 2012 2013 SES 2 1 -50.00% EN 05 0 1 100.00% EN 04 4 4 0.00% NN (Engineering) 13 12 -7.69% NQ (ProfTechAdmin) 13 9 -30.77% NU (TechAdmin Support) 1 1...

  13. 1999 Commercial Building Characteristics--Detailed Tables--Year...

    U.S. Energy Information Administration (EIA) Indexed Site

    Year Constructed > Detailed Tables-Year Constructed Complete Set of 1999 CBECS Detailed Tables Detailed Tables-Year Constructed Table B8. Year Constructed, Number of Buildings...

  14. CBECS Buildings Characteristics --Revised Tables

    Gasoline and Diesel Fuel Update (EIA)

    Structure Tables (16 pages, 93 kb) CONTENTS PAGES Table 8. Building Size, Number of Buildings, 1995 Table 9. Building Size, Floorspace, 1995 Table 10. Year Constructed, Number of Buildings, 1995 Table 11. Year Constructed, Floorspace, 1995 These data are from the 1995 Commercial Buildings Energy Consumption Survey (CBECS), a national probability sample survey of commercial buildings sponsored by the Energy Information Administration, that provides information on the use of energy in commercial

  15. Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs

    2008-09-11

    The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2317&D2). Remedial actions performed in the Balance of Site (BOS) Laboratory Area of EU Z2-33 and two small areas in EU Z2-42 are described in Sects. 5 through 10 of this Phased Construction Completion Report (PCCR). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for EU Z2-33; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe RAs performed in the EU Z2-33 BOS Laboratory Area and two small areas in EU Z2-42. Approximately 18 acres in EU Z2-33 are addressed in this PCCR. Based on the results of the DVS evaluation and RAs performed, all 18 acres are recommended for unrestricted industrial use to 10 ft bgs. Three Federal Facility Agreement sites are addressed and recommended for no further action within this acreage, including: (1) K-1004-L Recirculating Cooling Water Lines Leak Sites; (2) K-1044 Heavy Equipment Repair Shop; and (3) K-1015-A Laundry Pit. Remedial actions for EU Z2-33 were developed in response to DVS characterization results described in the EU Z2-33 Technical Memorandum (Appendix A) and to support reindustrialization of the East Tennessee Technology Park as a commercial industrial park. Remediation criteria were designed for the protection of a future industrial worker who normally would not have the potential for exposure to soil below 10ft bgs. Accordingly, the Zone 2 ROD required land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-33 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a low probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-33. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18 acres addressed in this PCCR were assigned a low probability for consideration of release for unrestricted land use.

  16. Project Construction

    Office of Energy Efficiency and Renewable Energy (EERE)

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  17. Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    RSI

    2008-03-01

    The purpose of this Phased Construction Completion Report (PCCR) is to present the fiscal year (FY) 2007 results of characterization activities and recommended remedial actions (RAs) for 11 exposure units (EUs) in Zone 2 (Z2-01, Z2-03, Z2-08, Z2-23, Z2-24, Z2-28, Z2-34, Z2-37, Z2-41, Z2-43, and Z2-44) at the East Tennessee Technology Park (ETTP), which is located in the northwest corner of the U.S. Department of Energy (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee (Fig. 1). ETTP encompasses a total land area of approximately 5000 acres that has been subdivided into three zones--Zone 1 ({approx}1400 acres), Zone 2 ({approx}800 acres), and the Boundary Area ({approx}2800 acres). Zone 2, which encompasses the highly industrialized portion of ETTP shown in Fig. 1, consists of all formerly secured areas of the facility, including the large processing buildings and direct support facilities; experimental laboratories and chemical and materials handling facilities; materials storage and waste disposal facilities; secure document records libraries; and shipping and receiving warehouses. The Zone 2 Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005) (Zone 2 ROD) specifies the future end use for Zone 2 acreage as uncontrolled industrial for the upper 10 ft of soils. Characterization activities in these areas were conducted in compliance with the Zone 2 ROD and the Dynamic Verification Strategy (DVS) and data quality objectives (DQOs) presented in the Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2007) (Zone 2 RDR/RAWP). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for the accessible EUs in FY 2007; (2) Describe and document the risk evaluation for each EU, and determine if the EU met the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe the RAs performed in Zone 2. The Zone 2 ROD divided the Zone 2 area into 7 geographic areas and 44 EUs. To facilitate the DQOs of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed, and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was executed and completed in FY 2007 for the 11 EUs addressed in this document. The main body of this report describes both the DVS process and scope of work performed and the RAs completed. The scope and approach for performing DVS activities performed in FY 2007 that lead to action/no further action decisions are presented in Sects. 2 through 4. RAs performed in FY 2007 are presented in Sects. 5 through 10. Future land use is described in Sect. 11, and the status of all Zone 2 EUs as of this PCCR is presented in Sect. 12.

  18. New Construction

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Commercial Program Development Commercial Current Promotions Industrial Federal Agriculture Commercial new construction projects may be eligible to receive reimbursements...

  19. Electrochemical construction

    DOE Patents [OSTI]

    Einstein, Harry (Springfield, NJ); Grimes, Patrick G. (Westfield, NJ)

    1983-08-23

    An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

  20. Construction and installation summary for fiscal year 1992 of the hydraulic head monitoring stations at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Dreier, R.B.; Switek, J.; Couzens, B.A.

    1992-12-01

    During FY 1992, as part of the Hydraulic Head Monitoring Station (HHMS) Project, three multiport wells (HHMS 12, 13, and 14) were constructed along or near the boundaries of Waste Area Grouping (WAG) 2 at Haw Ridge water gap. The purpose of this report is to document well construction and multiport component installation activities. The hydraulic head monitoring stations (HHMS) are well clusters and single multiport wells that provide data required for evaluation of the transition between shallow and deep groundwater systems and of the nature of these systems. This information is used for required characterization of the hydrologic framework as dictated by state and federal regulatory agencies. Groundwater contaminants may move laterally across WAG boundaries or offsite; they may also move in a vertical direction. Because the HHMS Project was designed to address otential contamination problems, the project provides a means for defining the bounds of the uppermost aquifer; identifying potential pathways for offsite contamination for shallow; intermediate, and deep groundwater flow; and evaluating the capacity for contaminant transport in intermediate and deep groundwater flow systems.

  1. Construction and installation summary for fiscal year 1992 of the hydraulic head monitoring stations at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Dreier, R.B.; Switek, J.; Couzens, B.A.

    1992-12-01

    During FY 1992, as part of the Hydraulic Head Monitoring Station (HHMS) Project, three multiport wells (HHMS 12, 13, and 14) were constructed along or near the boundaries of Waste Area Grouping (WAG) 2 at Haw Ridge water gap. The purpose of this report is to document well construction and multiport component installation activities. The hydraulic head monitoring stations (HHMS) are well clusters and single multiport wells that provide data required for evaluation of the transition between shallow and deep groundwater systems and of the nature of these systems. This information is used for required characterization of the hydrologic framework as dictated by state and federal regulatory agencies. Groundwater contaminants may move laterally across WAG boundaries or offsite; they may also move in a vertical direction. Because the HHMS Project was designed to address otential contamination problems, the project provides a means for defining the bounds of the uppermost aquifer; identifying potential pathways for offsite contamination for shallow; intermediate, and deep groundwater flow; and evaluating the capacity for contaminant transport in intermediate and deep groundwater flow systems.

  2. Construction | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policymakers Construction at Jefferson Lab The Technology & Engineering Development Facility or TEDF is one of the new facilities being constructed at Jefferon Lab is support of th enational science agenda. A D D I T I O N A L L I N K S: 12 GeV TEDF UIM ARRA Projects 10-Year Site Plan Facilities Home top-right bottom-left-corner bottom-right-corner Construction Two major construction projects are underway at Jefferson Lab - the 12 GeV Upgrade and the Technology & Engineering Development

  3. Construction Certifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Certifications Individual Permit: Construction Certifications Enhanced control measures were designed and installed at 67 Sites in 42 SMAs in 2012. Contact Environmental...

  4. Yongshan County Yonggu Construction and Construction Material...

    Open Energy Info (EERE)

    Yongshan County Yonggu Construction and Construction Material Co Ltd Jump to: navigation, search Name: Yongshan County Yonggu Construction and Construction Material Co., Ltd....

  5. Construction Certifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Certifications Individual Permit: Construction Certifications Enhanced control measures were designed and installed at 67 Sites in 42 SMAs in 2012. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Construction Certifications Enhanced Controls SMA Submittal Date and Letter Certification Document 2M-SMA-1 July 25, 2012 (see document for submittal letter and certification) Submittal of Certification of Installation of

  6. Fiscal Year 2010 Phased Construction Completion Report for EU Z2-32 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs

    2010-02-01

    The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORJO 1-2161 &D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORIO 1 -2224&D3) (RDRJRAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone I exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together, which allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was completed for the EU addressed in this document (EU Z2-32). The purpose of this Phased Construction Completion Report (PCCR) is to address the following: (1) Document DVS characterization results for EU Z2-32. (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs. (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results. (4) Describe the remedial action performed in the K-1066-G Yard in EU Z2-32. Approximately 18.4 acres are included in the EU addressed in this PCCR. Based on results of the DVS evaluation, all 18.4 acres are recommended for unrestricted industrial use to 10 ft bgs. There are no Federal Facility Agreement Sites included in Appendix A of the Zone 2 ROD in EU Z2-32. The Zone 2 ROD requires land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-32 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a high probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-32. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18.4 acres addressed in this PCCR were assigned a high probability for consideration of release for unrestricted land use. This document contains the main text (Sects. 1 through 13) and one appendix. The main text addresses the purpose for this PCCR as described above. Additional supporting detail (e.g., field work and data summaries, graphics) is provided in the EU Z2-32 technical memorandum (Appendix A). Historical and DVS analytical data used in this PCCR are provided on a compact disc accompanying this document and can be accessed through the Oak Ridge Environmental Information System.

  7. NIF Construction

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NIF Construction After careful preparation, a giant rotating crane lifted the NIF target chamber and gently placed it in the Target Bay, a breathtaking event that took only about 30 minutes. Building the World's Largest Laser Planning for NIF began in the early 1990s, and ground was broken on May 29, 1997. Energy Secretary Federico Peña said at the groundbreaking: "NIF will unleash the power of the heavens to make Earth a better place." To prepare the site for construction, more than

  8. 1999 Commercial Buildings Characteristics--Year Constructed

    U.S. Energy Information Administration (EIA) Indexed Site

    (202) 586-8800. Energy Information Administration Commercial Buildings Energy Consumption Survey Top Return to: "1999 CBECS-Commercial Buildings Characteristics" Specific questions...

  9. Pre-Construction Notification | Open Energy Information

    Open Energy Info (EERE)

    Construction Notification Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Pre-Construction NotificationLegal Published NA Year...

  10. Cogeneration project slated for construction

    SciTech Connect (OSTI)

    Not Available

    1993-09-13

    Destec Energy Inc. plans to begin construction of a 212-Mw gas-fired cogeneration plant in Polk County, Fla., late this year. The Houston-based firm will perform engineering and constructionmanagement services for the $150-million, combined-cycle project, but will call for proposals for construction services later this year, says project manager Bob Taylor. The plant north of Tampa, is scheduled to go on line in early 1995. All its electrical output will be sold to Florida Power Co. under a 30-year contract and process steam will go to the host, US Agrichemical Co., a large phosphate producer and fertilizer manufacturer.

  11. Carlisle Construction Materials | Open Energy Information

    Open Energy Info (EERE)

    Carlisle, Pennsylvania Zip: 17013 Product: Carlisle Construction Materials has been manufacturing single-ply membrane roofing systems for more than 40 years and has produced over...

  12. Enterprise Assessments Salt Waste Processing Facility Construction...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... observed ongoing construction work activities, including ... 5-year flow tests for all J-Area hydrants, and add explicit instructions on temperature requirements during ...

  13. Trends in Commercial Buildings--Floorspace Trend Detail

    U.S. Energy Information Administration (EIA) Indexed Site

    because the CBECS is a sample survey (see Overview of the Commercial Buildings Energy Consumption Survey for further discussion). Changes between successive surveys are...

  14. Trends in Commercial Buildings--Detailed Buildings and Floorspace...

    U.S. Energy Information Administration (EIA) Indexed Site

    ** estimates adjusted to match the 1995 CBECS definition of target population Energy Information Administration Commercial Buildings Energy Consumption Survey Table 2....

  15. "Table B23. Primary Space-Heating Energy Sources, Floorspace...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... "Buildings with Cooling ......",58474,56361,17160,30003,2912,4392 "Buildings with Water Heating .",56115,54204,15562,29379,3085,4519 "Buildings with Cooking ......",24681,23813,7...

  16. "Table B11. Employment Size Category, Floorspace, 1999"

    U.S. Energy Information Administration (EIA) Indexed Site

    ... with Cooling ......",58474,8704,5291,7409,9930,8519,8129,10491 "Buildings with Water Heating .",56115,8401,5145,7000,9445,8166,7760,10199 "Buildings with Cooking ...

  17. "Table HC1.4 Cooled Floorspace Usage Indicators, 2005" " ...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... Thermostats" "Reduces Temperature During Day" "Yes",15.1,0.7,2.6,3.4,3,1.7,1.2,2.6 "No",9.9,0.5,2,1.8,1.9,1.1,1,1.6 "Reduces Temperature at Night" "Yes",15.4,0.7,2.8,3.2...

  18. "Table HC1.3 Heated Floorspace Usage Indicators, 2005" " ...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... Thermostats" "Reduces Temperature During Day" "Yes",18.6,0.4,2.6,3.7,3.7,2,"6 1.9",3.6 "No",14.5,0.7,2.3,3,2.6,1,"6 1.5",2.5 "Reduces Temperature at Night" ...

  19. Trends in Commercial Buildings--Buildings and Floorspace

    U.S. Energy Information Administration (EIA) Indexed Site

    activity. Number of Commercial Buildings In 1979, the Nonresidential Buildings Energy Consumption Survey estimated that there were 3.8 million commercial buildings in the...

  20. Table B36. Refrigeration Equipment, Number of Buildings and Floorspace...

    U.S. Energy Information Administration (EIA) Indexed Site

    ...9,334,261,90,273,1851,1783,1576,514,1287 "Health Care ......",127,12,7,3,10,29... ..",186,9,"Q","Q",8,1907,408,"Q","Q",346 "Health Care Complex ......",72,10,8,2,6,2339...

  1. Table B15. Number of Establishments in Building, Floorspace,...

    U.S. Energy Information Administration (EIA) Indexed Site

    .........",1851,1638,"Q","Q","N","N","N" "Health Care ......",2918,2139,341,"Q... ..",1907,1665,"Q","N","Q","N","N" "Health Care Complex ......",2339,1673,334,"Q...

  2. Table B3. Census Region, Number of Buildings and Floorspace,...

    U.S. Energy Information Administration (EIA) Indexed Site

    ...",349,"Q",95,124,89,1851,"Q",558,676,396 "Health Care ......",127,14,33,59,21,...9,21.2,18.3,19.5,9.7,41.5,19.6,19.1,17.1 "Health Care ......",17.6,41.8,41.2,1...

  3. Table B29. Percent of Floorspace Cooled, Number of Buildings...

    U.S. Energy Information Administration (EIA) Indexed Site

    ...",349,"Q",59,98,167,1851,"Q",274,752,734 "Health Care ......",127,"Q","Q",27,7...,29.1,24,18.5,14.8,9.7,28.8,29,18.6,15.5 "Health Care ......",17.6,84.3,44.2,3...

  4. Table B28. Percent of Floorspace Heated, Number of Buildings...

    U.S. Energy Information Administration (EIA) Indexed Site

    ...349,"Q","Q",67,213,1851,"Q","Q",428,1084 "Health Care ......",127,"N","Q",20,9...2,36.6,21.2,13.6,9.7,38.3,42.7,20.9,15.2 "Health Care ......",17.6,0,62.9,44.1...

  5. "Table B21. Space-Heating Energy Sources, Floorspace, 1999"

    U.S. Energy Information Administration (EIA) Indexed Site

    ... "District Chilled Water ......",2750,2739,1012,517,"Q",2279,"Q","Q" "Water-Heating Energy Sources" "(more than one may apply)" "Electricity ......",24171,230...

  6. "Table B27. Space Heating Energy Sources, Floorspace for Non...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... "District Chilled Water ......",2853,2734,637,605,"Q",2231,"Q","N" "Water-Heating Energy Sources" "(more than one may apply)" "Electricity ......",27490,265...

  7. Career Map: Construction Manager

    Broader source: Energy.gov [DOE]

    The Wind Program's Career Map provides job description information for Construction Manager positions.

  8. Call center construction underway

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    only two weeks on the job, "design and construction work is in high gear," said Charlie Moore, MK Construction Manager. The 62,000-square-foot facility at 3111 National Parks...

  9. Fortis Construction Inc.

    Energy Savers [EERE]

    Rob Fallow, Senior Project Manager Fortis Construction Portland, Oregon, USA Market Sectors Commercial Data Centers Healthcare Higher Education Pricing Major...

  10. S. 936: A Bill to authorize appropriations for fiscal year 1998 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe personnel strengths for such fiscal year for the Armed Forces, and for other purposes. Introduced in the Senate of the United States, One Hundred Fifth Congress, First session

    SciTech Connect (OSTI)

    1997-12-31

    This report discusses a bill that may be cited as the National Defense Authorization Act for fiscal year 1998.

  11. Construction Control Representative

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Engineering and Construction Field Engineering, (J5600) 5555...

  12. Owens Construction | Open Energy Information

    Open Energy Info (EERE)

    Construction Jump to: navigation, search Name: Owens Construction Place: Powell, OH Website: www.owensconstruction.com References: Owens Construction1 Information About...

  13. Rezac Construction | Open Energy Information

    Open Energy Info (EERE)

    Rezac Construction Jump to: navigation, search Name: Rezac Construction Place: Lincoln, NE Website: www.rezacconstruction.com References: Rezac Construction 1 Information About...

  14. Wanzek Construction | Open Energy Information

    Open Energy Info (EERE)

    Wanzek Construction Jump to: navigation, search Logo: Wanzek Construction Name: Wanzek Construction Address: 2028 2nd Avenue NW Place: West Fargo, ND Country: United States Zip:...

  15. WAC 173-400-111 - Processing Notice of Construction Applications...

    Open Energy Info (EERE)

    and Portable SourcesLegal Abstract Construction application requirements for sources of air pollution. Published NA Year Signed or Took Effect 2011 Legal Citation WAC...

  16. Passive solar construction handbook

    SciTech Connect (OSTI)

    Levy, E.; Evans, D.; Gardstein, C.

    1981-08-01

    Many of the basic elements of passive solar design are reviewed. The unique design constraints presented in passive homes are introduced and many of the salient issues influencing design decisions are described briefly. Passive solar construction is described for each passive system type: direct gain, thermal storage wall, attached sunspace, thermal storage roof, and convective loop. For each system type, important design and construction issues are discussed and case studies illustrating designed and built examples of the system type are presented. Construction details are given and construction and thermal performance information is given for the materials used in collector components, storage components, and control components. Included are glazing materials, framing systems, caulking and sealants, concrete masonry, concrete, brick, shading, reflectors, and insulators. The Load Collector Ratio method for estimating passive system performance is appended, and other analysis methods are briefly summarized. (LEW)

  17. Residential New Construction Program

    Broader source: Energy.gov [DOE]

    The Residential New Construction Program includes two levels that can be achieved by completing various energy efficiency measures: Base Level and High Performance Level. Projects meeting the req...

  18. New Construction Program

    Broader source: Energy.gov [DOE]

    NOTE: On March 2016, NYSERDA revised the Commercial New Construction program (PON 1601) extending the program through December 29, 2017, or until the funds are fully committed. 

  19. Genomic library construction

    DOE Patents [OSTI]

    Church, George M.; Zhang, Kun

    2011-07-26

    Compositions and methods for amplifying nucleic acid sequences from a single cell are provided. Compositions and methods for constructing a genomic library from a single cell are also provided.

  20. UMC Construction Waste (4493)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    collect all Construction waste identified in 2006 and excess through plant sales, recycle through plant scrap metal recycle program, dispose in Y-12 on-site landfill, or ship to...

  1. Home construction | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home construction Home construction Family members inspect construction of their future home.

  2. Page Under Construction | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Page Under Construction Page Under Construction This page is currently under construction.

  3. Construction Schedule | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction Schedule Current Projects 27-ID and 35-ID APS Vibration Reporting Protocol Summary of Construction Equipment Tests and Activities Jan 2014 Past Projects APCF LOM438...

  4. Metric Construction | Open Energy Information

    Open Energy Info (EERE)

    Metric Construction Jump to: navigation, search Name: Metric Construction Place: Boston, MA Information About Partnership with NREL Partnership with NREL Yes Partnership Type Test...

  5. Martifer Construction | Open Energy Information

    Open Energy Info (EERE)

    Construction Jump to: navigation, search Name: Martifer Construction Place: Oliveira de Frades, Portugal Zip: 3684-909 Sector: Services, Solar, Wind energy Product: Portugal-based...

  6. Construction plans jump; operations skid in 1996

    SciTech Connect (OSTI)

    True, W.R.

    1997-08-04

    Federally regulated oil and gas pipelines turned in mixed performances in 1996, a review of annual reports filed with the US Federal Energy Regulatory Commission (FERC) shows. Plans for new pipeline construction, filed with both the FERC and Canadian regulatory bodies, increased during a 12-month period ending June 30, 1997. Natural-gas pipeline operating companies increased their operating revenues but saw their incomes fall; oil pipelines saw both revenues and incomes fall sharply as deliveries were flat. Major natural-gas pipelines slightly increased the amounts of gas they moved for a fee and decreased gas sold out of their systems. In 1996, liquids pipelines moved fewer barrels than a year earlier and reduced in all categories the miles of line operated. Each year in this exclusive report, Oil and Gas Journal tracks revenues and incomes earned from operations along with volumes moved, as submitted to the FERC by US regulated interstate pipeline companies. Data are presented on the following: pipeline revenues, incomes--1996; North American pipeline-construction costs; US pipeline costs--estimated vs. actual; North American compressor construction costs; US compressor costs--estimated vs. actual; Canadian pipeline-construction costs, actual; US interstate mileage; investment in liquids pipelines; 10 years of land-construction costs; top 10 interstate liquids lines; top 10 interstate gas lines; liquids pipeline companies; and gas pipeline companies.

  7. Toward a constructive physics

    SciTech Connect (OSTI)

    Noyes, H.P.; Gefwert, C.; Manthey, M.J.

    1983-06-01

    We argue that the discretization of physics which has occurred thanks to the advent of quantum mechanics has replaced the continuum standards of time, length and mass which brought physics to maturity by counting. The (arbitrary in the sense of conventional dimensional analysis) standards have been replaced by three dimensional constants: the limiting velocity c, the unit of action h, and either a reference mass (eg m/sub p/) or a coupling constant (eg G related to the mass scale by hc/(2..pi..Gm/sub p//sup 2/) approx. = 1.7 x 10/sup 38/). Once these physical and experimental reference standards are accepted, the conventional approach is to connect physics to mathematics by means of dimensionless ratios. But these standards now rest on counting rather than ratios, and allow us to think of a fourth dimensionless mathematical concept, which is counting integers. According to constructive mathematics, counting has to be understood before engaging in the practice of mathematics in order to avoid redundancy. In its strict form constructive mathematics allows no completed infinities, and must provide finite algorithms for the computation of any acceptable concept. This finite requirement in constructive mathematics is in keeping with the practice of physics when that practice is restricted to hypotheses which are testable in a finite time. In this paper we attempt to outline a program for physics which will meet these rigid criteria while preserving, in so far as possible, the successes that conventional physics has already achieved.

  8. 2015 Construction Safety Workshop Presentations

    Broader source: Energy.gov [DOE]

    2015 Construction Safety Workshop Presentations, June 16, 2015 - Forrestal Building - Washington, DC

  9. Y YEAR

    National Nuclear Security Administration (NNSA)

    2 40 -4.76% YEAR 2013 2014 Males 37 35 -5.41% Females 5 5 0% YEAR 2013 2014 SES 2 2 0% EJEK 5 4 -20.00% EN 05 5 7 40.00% EN 04 6 6 0% EN 03 1 1 0% NN...

  10. Y YEAR

    National Nuclear Security Administration (NNSA)

    79 67 -15.19% YEAR 2013 2014 Males 44 34 -22.73% Females 35 33 -5.71% YEAR 2013 2014 SES 6 4 -33.33% EJEK 1 1 0% EN 05 9 8 -11.11% EN 04 6 5 -16.67% NN...

  11. Y YEAR

    National Nuclear Security Administration (NNSA)

    5 79 -7.06% YEAR 2013 2014 Males 59 57 -3.39% Females 26 22 -15.38% YEAR 2013 2014 SES 1 0 -100% EJEK 4 3 -25.00% EN 05 3 2 -33.33% EN 04 22 22 0% EN 03...

  12. Calutron construction | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    construction Calutron construction Construction workers pour the concrete floor and footers for a Y-12 Calutron process building...

  13. SF6432-CN Construction

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7/31/13 Page 1 of 31 Printed copies of this document are uncontrolled. Retrieve latest version electronically. SANDIA CORPORATION SF 6432-CN (07/2013) Section II STANDARD TERMS AND CONDITIONS FOR FIRM-FIXED PRICE COMMERCIAL CONSTRUCTION CONTRACTS THE FOLLOWING CLAUSES APPLY TO THIS CONTRACT AS INDICATED UNLESS SPECIFICALLY DELETED, OR EXCEPT TO THE EXTENT THEY ARE SPECIFICALLY SUPPLEMENTED OR AMENDED IN WRITING IN THE COVER PAGE OR SECTION I. (CTRL+CLICK ON A LINK BELOW TO ADVANCE DIRECTLY TO

  14. Y YEAR

    National Nuclear Security Administration (NNSA)

    7 35 -5.41% ↓ YEAR 2013 2014 Males 27 25 -7.41% ↓ Females 10 10 0% / YEAR 2013 2014 SES 1 1 0% / EN 05 1 1 0% / EN 04 11 10 -9.09% ↓ NN (Engineering) 8 8 0% / NQ (Prof/Tech/Admin) 14 15 7.14% ↑ NU (Tech/Admin Support) 2 0 -100% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 1 1 0% / African American Female (AA,F) 3 3 0% / Asian American Pacific Islander Male (AAPI,M) 0 0 0% /

  15. Y YEAR

    National Nuclear Security Administration (NNSA)

    4 79 -5.95% ↓ YEAR 2013 2014 Males 59 55 -6.78% ↓ Females 25 24 -4.00% ↓ YEAR 2013 2014 SES 3 3 0% / EJ/EK 4 4 0% / EN 04 2 1 -50.00% ↓ NN (Engineering) 20 20 0% / NQ (Prof/Tech/Admin) 55 51 -7.27% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 0 0 0% / African American Male (AA,M) 10 10 0% / African American Female (AA,F) 9 8 -11.11% ↓ Asian American Pacific Islander Male (AAPI,M) 2 2 0% / Asian American Pacific

  16. Y YEAR

    National Nuclear Security Administration (NNSA)

    8 87 -1.14% ↓ YEAR 2013 2014 Males 46 46 0% / Females 42 41 -2.38% ↓ YEAR 2013 2014 SES 1 0 -100% ↓ EJ/EK 4 2 -50.00% ↓ NN (Engineering) 12 12 0% / NQ (Prof/Tech/Admin) 68 70 2.94% ↑ NU (Tech/Admin Support) 3 3 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 2 2 0% / African American Male (AA,M) 5 5 0% / African American Female (AA,F) 5 6 20.00% ↑ Asian American Pacific Islander Male (AAPI,M) 0 0 0% / Asian

  17. Y YEAR

    National Nuclear Security Administration (NNSA)

    1 14 27.27% ↑ YEAR 2013 2014 Males 9 12 33.33% ↑ Females 2 2 0% / YEAR 2013 2014 SES 2 2 0% / EJ/EK 1 1 0% / EN 04 0 1 100% ↑ EN 00 0 1 100% ↑ NN (Engineering) 5 5 0% / NQ (Prof/Tech/Admin) 3 4 33.33% ↑ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 0 0 0% / African American Male (AA,M) 0 0 0% / African American Female (AA,F) 0 0 0% / Asian American Pacific Islander Male (AAPI,M) 1 1 0% / Asian American Pacific

  18. Y YEAR

    National Nuclear Security Administration (NNSA)

    40 36 -10.00% ↓ YEAR 2013 2014 Males 18 18 0% / Females 22 18 -18.18% ↓ YEAR 2013 2014 SES 3 2 -33.33% ↓ EJ/EK 1 1 0% / EN 03 1 1 0% / NN (Engineering) 3 3 0% / NQ (Prof/Tech/Admin) 30 27 -10.00% ↓ NU (Tech/Admin Support) 2 2 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 0 0 0% / African American Male (AA,M) 1 1 0% / African American Female (AA,F) 1 1 0% / Asian American Pacific Islander Male (AAPI,M) 0 0 0% /

  19. Y YEAR

    National Nuclear Security Administration (NNSA)

    4 30 -11.76% ↓ YEAR 2013 2014 Males 16 14 -12.50% ↓ Females 18 16 -11.11% ↓ YEAR 2013 2014 SES 1 1 0% / EJ/EK 3 1 -66.67% ↓ NQ (Prof/Tech/Admin) 29 27 -6.90% ↓ NU (Tech/Admin Support) 1 1 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 1 1 0% / American Indian Alaskan Native Female (AIAN,F) 2 2 0% / African American Male (AA,M) 3 3 0% / African American Female (AA,F) 7 6 -14.29% ↓ Asian American Pacific Islander Male (AAPI,M) 1 1 0% / Asian American Pacific Islander

  20. Y YEAR

    National Nuclear Security Administration (NNSA)

    9 209 -8.73% ↓ YEAR 2013 2014 Males 76 76 0% / Females 153 133 -13.07% ↓ YEAR 2013 2014 SES 9 6 -33.33% ↓ EJ/EK 1 1 0% / NQ (Prof/Tech/Admin) 208 194 -6.73% ↓ NU (Tech/Admin Support) 11 8 -27.27% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 2 2 0% / American Indian Alaskan Native Female (AIAN,F) 3 2 -33.33% ↓ African American Male (AA,M) 10 10 0% / African American Female (AA,F) 39 36 -7.69% ↓ Asian American Pacific Islander Male (AAPI,M) 1 1 0% / Asian American

  1. Y YEAR

    National Nuclear Security Administration (NNSA)

    8 27 -3.57% ↓ YEAR 2013 2014 Males 18 17 -5.56% ↓ Females 10 10 0% / YEAR 2013 2014 SES 1 1 0% / EN 05 1 1 0% / EN 04 4 3 -25.00% ↓ NN (Engineering) 12 12 0% / NQ (Prof/Tech/Admin) 9 9 0% / NU (Tech/Admin Support) 1 1 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 4 4 0% / African American Female (AA,F) 3 4 33.33% ↑ Asian American Pacific Islander Male (AAPI,M) 1 1 0% / Asian

  2. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    SciTech Connect (OSTI)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  3. DOE - Office of Legacy Management -- Chemical Construction Co Linden Pilot

    Office of Legacy Management (LM)

    Plant - NJ 12 Chemical Construction Co Linden Pilot Plant - NJ 12 FUSRAP Considered Sites Site: Chemical Construction Co., Linden Pilot Plant (NJ.12 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Chemical Construction Corporation Pilot Plant Chemico NJ.12-1 NJ.12-2 Location: Linden , New Jersey NJ.12-3 Evaluation Year: 1987 NJ.12-4 Site Operations: Performed research and development operations under AEC contract to develop a process for

  4. U.S. Energy Information Administration (EIA) - Pub

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    consumption grows by 0.7%year despite 1.0% annual growth in commercial floorspace. Natural gas consumption also increases over the period despite increases in building...

  5. New construction plans up

    SciTech Connect (OSTI)

    True, W.R.

    1988-11-28

    Pipeline mileage proposed of U.S. natural-gas systems indicates a healthier industry, data in this year's OGJ exclusive, annual pipeline economics report show. But Federal Energy Regulatory Commission annual-report data show continuing declines in 1987 for pipeline-company operating revenues and incomes. And federal data further reveal the shift among natural-gas pipeline companies away from their traditional roles as gas volumes transported for other far outstrip gas sales.

  6. Chapter 8: Constructing the Building

    Broader source: Energy.gov [DOE]

    Chapter 8 of the LANL Sustainable Design Guide contains information for construction of the building so it will perform as intended and protect the environment.

  7. Hackney Construction | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name: Hackney Construction Address: 309 Farrens Creek LanePO Box 13 Place: Grangeville, Idaho Zip: 83530 Region: Rockies Area Sector: Solar Product:...

  8. TSD Custom Construction | Open Energy Information

    Open Energy Info (EERE)

    TSD Custom Construction Jump to: navigation, search Name: TSD Custom Construction Place: Madison, WI Website: www.tsdcustomconstruction.com References: TSD Custom Construction1...

  9. Construction Begins | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction Begins Construction Begins Workers drill down to bedrock for the pouring of Y-12 building footers as construction begins in 1942

  10. OTEC large systems construction techniques

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    Requirements for the construction and installation of various types of 400 MWe OTEC commercial size platforms and cold water pipes are presented. The capability of the state of the art in Technologies and Facilities, to satisfy the requirements of OTEC commercial plant construction and installation are assessed.

  11. Compositions of constructed microbial mats

    DOE Patents [OSTI]

    Bender, Judith A. (Atlanta, GA); Phillips, Peter C. (Decatur, GA)

    1999-01-01

    Compositions and methods of use of constructed microbial mats, comprising cyanobacteria and purple autotrophic bacteria and an organic nutrient source, in a laminated structure, are described. The constructed microbial mat is used for bioremediation of different individual contaminants and for mixed or multiple contaminants, and for production of beneficial compositions and molecules.

  12. Buildings Energy Data Book: 2.5 Residential Construction and Housing Market

    Buildings Energy Data Book [EERE]

    3 Value of New Building Construction, by Year ($2010 Billion) 1980 1985 1990 1995 2000 2005 2006 2007 2008 2009 2010 Source(s): DOC, Current Construction Reports: Value of New Construction Put in Place, C30, Aug. 2003, Table 1 for 1980-1990; DOC, Annual Value of Private Construction Put in Place 1993-2001, Annual Value of Private Construction Put in Place 2002-2011, Annual Value of Public Construction Put in Place 1993- 2001, Annual Value of Public Construction Put in Place 2002-2011; and EIA,

  13. Heilongjiang Province Water Transportation Construction | Open...

    Open Energy Info (EERE)

    Construction Jump to: navigation, search Name: Heilongjiang Province Water Transportation Construction Place: Harbin, Heilongjiang Province, China Sector: Hydro Product: China...

  14. Passive-solar construction handbook

    SciTech Connect (OSTI)

    Levy, E.; Evans, D.; Gardstein, C.

    1981-02-01

    Many of the basic elements of passive solar design are reviewed. Passive solar construction is covered according to system type, each system type discussion including a general discussion of the important design and construction issues which apply to the particular system and case studies illustrating designed and built examples of the system type. The three basic types of passive solar systems discussed are direct gain, thermal storage wall, and attached sunspace. Thermal performance and construction information is presented for typical materials used in passive solar collector components, storage components, and control components. Appended are an overview of analysis methods and a technique for estimating performance. (LEW)

  15. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    SciTech Connect (OSTI)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  16. Itogumi Construction | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name: Itogumi Construction Place: Hokkaido, Japan Zip: 060-8554 Product: Japan-based engineering contractor. It set up a PV module joint venture with...

  17. Oak Ridge Construction | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction Oak Ridge Construction Construction of typical A- and B-type houses in Oak Ridge

  18. DOE Announces $160 Million for Biorefinery Construction and Highlights New

    Energy Savers [EERE]

    Agricultural Program to Promote Biofuels | Department of Energy 60 Million for Biorefinery Construction and Highlights New Agricultural Program to Promote Biofuels DOE Announces $160 Million for Biorefinery Construction and Highlights New Agricultural Program to Promote Biofuels February 22, 2006 - 12:11pm Addthis Funding Paves the Way for Diversifying America's Energy Mix DECATUR, IL - Energy Secretary Samuel W. Bodman, today announced $160 million in cost-shared funding over three years to

  19. French landmark decree authorizes ITER construction | Princeton Plasma

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Lab French landmark decree authorizes ITER construction By John Greenwald November 20, 2012 Tweet Widget Google Plus One Share on Facebook The French government has capped more than two years of review by issuing a license for the construction of ITER, the international fusion project that the European Union, the United States and five other countries are building in Cadarache, France, to demonstrate the feasibility of fusion energy. French Prime Minister Jean-Marc Ayrault signed the

  20. construction

    National Nuclear Security Administration (NNSA)

    insulated roofs and more energy efficient HVAC systems. The cool roof has high solar reflectance, so it emits absorbed solar radiation back into the atmosphere, which...

  1. Weather, construction inflation could squeeze North American pipelines

    SciTech Connect (OSTI)

    True, W.R.

    1998-08-31

    Major North American interstate and interprovincial pipeline companies appear headed for a squeeze near-term: 1997 earnings from operations were down for the second straight year even as the companies expected new construction to begin this year or later to cost more. The effects of warmer-than-normal weather during 1997 in North America made a showing in annual reports filed by US regulated interstate oil and gas pipeline companies with the US Federal Energy Regulatory Commission (FERC). This paper contains data on the following: pipeline revenues, incomes--1997; North American pipeline costs; North American pipeline costs (estimated vs. actual); North American compressor construction costs; US compressor costs (estimated vs. actual); US interstate mileage; investment in liquids pipelines; 10 years of land construction costs; top 10 interstate liquids lines; top 10 interstate gas lines; liquids pipeline companies; and gas pipeline companies.

  2. " Million U.S. Housing Units"

    U.S. Energy Information Administration (EIA) Indexed Site

    2 Living Space Characteristics by Year of Construction, 2005" " Million U.S. Housing Units" ,,"Year of Construction" ,"Housing Units (millions)" ,,"Before 1940","1940 to 1949","1950 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999","2000 to 2005" "Living Space Characteristics" "Total",111.1,14.7,7.4,12.5,12.5,18.9,18.6,17.3,9.2 "Floorspace

  3. "Table B16. Employment Size Category, Floorspace for Non-Mall...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... with Cooling ......",56940,9591,5726,7304,10566,7428,6806,9519 "Buildings with Water Heating .",56478,9525,5393,7182,10480,7688,6815,9395 "Buildings with Cooking ...

  4. "Table B29. Primary Space-Heating Energy Sources, Total Floorspace...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... "Buildings with Cooling ......",56940,55188,15562,30808,2836,4147 "Buildings with Water Heating .",56478,55154,14429,31026,3539,4095 "Buildings with Cooking ......",22237,21725,5...

  5. "Table B25. Energy End Uses, Floorspace for Non-Mall Buildings...

    U.S. Energy Information Administration (EIA) Indexed Site

    may apply)" ,,"Space Heating","Cooling","Water Heating","Cooking","Manu- facturing" "All ...5378,4653,4631,1926,"Q" "District Chilled Water ......",2853,2734,2853,2655,1274,"Q" ...

  6. Table B30. Percent of Floorspace Lit When Open, Number of Buildings...

    U.S. Energy Information Administration (EIA) Indexed Site

    ...,349,"Q",68,109,171,1851,"Q",443,658,746 "Health Care ......",127,"N","Q",58,4....3,22,15.8,14.9,9.7,100.3,25.8,19.1,15.6 "Health Care ......",17.6,0,48.3,23.3...

  7. Table B1. Summary Table: Totals and Means of Floorspace, Number...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... "District Chilled Water ......",50,2750,4637,55.4,593,81 "Water-Heating Energy Sources" "(more than one may apply)" "Electricity ......",1546,2417...

  8. Table B27. Cooking Energy Sources, Number of Buildings and Floorspace...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... "Other ......",153,47,24,15,"Q",2322,1331,968,717,"Q" "Water Heating Energy Sources" "(more than one may apply)" "Electricity ......",1546,283,...

  9. Table HC1.1.4 Housing Unit Characteristics by Average Floorspace...

    U.S. Energy Information Administration (EIA) Indexed Site

    "Wood",20,3.4,1064,828,316,768,676,407 "Stucco",14.8,4.3,906,659,354,898,717,508 "ConcreteConcrete Block",5.3,1.9,766,598,535,943,653,540 "Composition (Shingle)",1.9,"Q","Q","...

  10. 2nd Annual National Safety Awareness Event to Prevent Falls in Construction

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy nd Annual National Safety Awareness Event to Prevent Falls in Construction 2nd Annual National Safety Awareness Event to Prevent Falls in Construction April 27, 2015 - 8:08am Addthis 2nd Annual National Safety Awareness Event to Prevent Falls in Construction As part of a Fall Prevention Campaign launched 3 years ago by the Occupational Safety and Health Administration (OSHA), the National Institute for Occupational Safety and Health, and the Center for Construction

  11. SUN (re)construction | Open Energy Information

    Open Energy Info (EERE)

    SUN (re)construction Jump to: navigation, search Logo: SUN (re)construction Name: SUN (re)construction Address: 1351 Harker Avenue Place: Palo Alto, California Zip: 94301 Region:...

  12. Career Map: Construction Worker | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Construction Worker Career Map: Construction Worker Several construction workers work to attach turbine blades to a small wind turbine. Construction Worker Position Title Construction Worker Alternate Title(s) Laborer and Helper, Equipment Operator, Crane Operator Education & Training Level High school diploma or equivalent. Some training may be preferred. Equipment operators must hold a driver's license. Education & Training Level Description Most construction workers learn their trade

  13. Texas Beachfront Construction Webpage | Open Energy Information

    Open Energy Info (EERE)

    Construction Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Texas Beachfront Construction Webpage Author Texas General Land Office Published...

  14. China Nuclear Engineering Construction Corporation CNEC | Open...

    Open Energy Info (EERE)

    Nuclear Engineering Construction Corporation CNEC Jump to: navigation, search Name: China Nuclear Engineering & Construction Corporation (CNEC) Place: Beijing, China Zip: 100840...

  15. (Electric and Gas) Residential New Construction Program

    Broader source: Energy.gov [DOE]

    The Energize CT offers a program designed to encourage the construction of energy efficient homes. The Residential New Construction Program offers incentives targeted at increasing energy...

  16. EDIG Construction Management | Open Energy Information

    Open Energy Info (EERE)

    Name: EDIG Construction Management Place: Israel Product: String representation "E.D.I.G. is a p ... pment projects." is too long. References: EDIG Construction Management1...

  17. Riverside Public Utilities- Energy Efficiency Construction Incentive

    Broader source: Energy.gov [DOE]

    Riverside Public Utilities' (RPU) Commercial New Construction Incentives are designed to encourage owners/developers to invest in energy efficient designs in new construction, building expansion...

  18. Anaheim Public Utilities - Commercial & Industrial New Construction...

    Broader source: Energy.gov (indexed) [DOE]

    Utilities (APU) offers commercial, industrial, and institutional customers the New Construction Incentives Program to offset construction and installation costs of energy...

  19. SEPCOIII Electric Power Construction Corporation | Open Energy...

    Open Energy Info (EERE)

    SEPCOIII Electric Power Construction Corporation Jump to: navigation, search Name: SEPCOIII Electric Power Construction Corporation Place: China Zip: 266100 Sector: Services...

  20. Ruihua Construction Corporation RHC | Open Energy Information

    Open Energy Info (EERE)

    Ruihua Construction Corporation RHC Jump to: navigation, search Name: Ruihua Construction Corporation (RHC) Place: Shenzhen, Guangdong Province, China Zip: 518040 Sector: Solar...

  1. Qinghai Huanghe Zhongxing Hydropower Construction Development...

    Open Energy Info (EERE)

    Zhongxing Hydropower Construction Development Co Ltd Jump to: navigation, search Name: Qinghai Huanghe Zhongxing Hydropower Construction Development Co., Ltd Place: Qinghai...

  2. Consolidated Construction Consortium Ltd | Open Energy Information

    Open Energy Info (EERE)

    Consolidated Construction Consortium Ltd Jump to: navigation, search Name: Consolidated Construction Consortium Ltd Place: Chennai - 600 004., Tamil Nadu, India Zip: 600004 Sector:...

  3. Econnect Construction Ltd | Open Energy Information

    Open Energy Info (EERE)

    Econnect Construction Ltd Jump to: navigation, search Name: Econnect Construction Ltd Place: Northumberland, United Kingdom Zip: NE46 3PU Sector: Renewable Energy Product:...

  4. Colorado Construction Dewatering General Permit | Open Energy...

    Open Energy Info (EERE)

    Colorado Construction Dewatering General Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Colorado Construction Dewatering...

  5. Nor-son Construction | Open Energy Information

    Open Energy Info (EERE)

    Nor-son Construction Jump to: navigation, search Name: Nor-son Construction Place: Fargo, ND Information About Partnership with NREL Partnership with NREL Yes Partnership Type Test...

  6. GreenTech Construction | Open Energy Information

    Open Energy Info (EERE)

    GreenTech Construction Jump to: navigation, search Name: GreenTech Construction Address: 7591 Perry Rd. Place: Delaware, Ohio Zip: 43015 Sector: Buildings, Efficiency Phone Number:...

  7. Toyo Construction Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Co Ltd Jump to: navigation, search Name: Toyo Construction Co Ltd Place: Tokyo, Tokyo, Japan Product: Technical engineers and construction firm which worked with Fuji Electric on...

  8. construction | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    construction | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog

  9. Construction Kickoff Meeting Agenda | Department of Energy

    Office of Environmental Management (EM)

    Construction Kickoff Meeting Agenda Construction Kickoff Meeting Agenda Document serves as a standard agenda for the construction kickoff meeting. File p4-01_construct_kickoff_8.docx More Documents & Publications Investment-Grade Audit Kickoff Meeting Sample Agenda Agenda: Preliminary Assessment Kickoff Meeting FEMP ESPC Project Development Resource Guide

  10. HPSS Yearly Network Traffic

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HPSS Yearly Network Traffic HPSS Yearly Network Traffic Yearly Summary of IO Traffic Between Storage and Network Destinations These bar charts show the total transfer traffic for...

  11. Fiscal Year 2010 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom; Mike Lewis

    2010-11-01

    This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

  12. Fiscal Year 2009 Revegetation Assessment

    SciTech Connect (OSTI)

    Michael Lewis

    2009-10-01

    This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Recommendation(s) for each site.

  13. HPSS Yearly Network Traffic

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HPSS Yearly Network Traffic HPSS Yearly Network Traffic Yearly Summary of I/O Traffic Between Storage and Network Destinations These bar charts show the total transfer traffic for each year between storage and network destinations (systems within and outside of NERSC). Traffic for the current year is an estimate derived by scaling the known months traffic up to 12 months. The years shown are calendar years. The first graph shows the overall growth in network traffic to storage over the years.

  14. Y-12 construction | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    construction Y-12 construction A Manhattan Engineering District technical sergeant looks over nearly completed construction at Y-12...

  15. Construction of file database management

    SciTech Connect (OSTI)

    MERRILL,KYLE J.

    2000-03-01

    This work created a database for tracking data analysis files from multiple lab techniques and equipment stored on a central file server. Experimental details appropriate for each file type are pulled from the file header and stored in a searchable database. The database also stores specific location and self-directory structure for each data file. Queries can be run on the database according to file type, sample type or other experimental parameters. The database was constructed in Microsoft Access and Visual Basic was used for extraction of information from the file header.

  16. Fiscal Year 2012 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2012-11-01

    This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  17. Fiscal Year 2013 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2013-11-01

    This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  18. DOE Challenge Home Program Happy New Year!

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Happy New Year! What an incredible year for DOE Challenge Home! In 2013, we launched new national program requirements in January and then hung on for an incredible ride. Over the last twelve months we introduced a new Zero Energy Ready Home training program with over 30 sessions across the country; developed a customizable homebuyer brochure that conveys the compelling Challenge Home value proposition; engaged commitments from over 170 builder partners to construct nearly 8,000 certified homes;

  19. IID Energy- New Construction Energy Efficiency Program

    Broader source: Energy.gov [DOE]

     IID’s New Construction Energy Efficiency Program (NCEEP) is a non-residential new construction and renovation energy efficiency program that combines an integrated design process with financial...

  20. Montana Construction Dewatering General Permit Application Information...

    Open Energy Info (EERE)

    overview of Construction Dewatering General Permit process. Author Montana Department of Environmental Quality - Water Protection Bureau Published Montana Department of...

  1. NREL: Environment, Health, and Safety - Construction Subcontractors

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Documents Environment, Health, and Safety Printable Version Construction Subcontractors Documents The purpose of this page is to ensure NREL Environment, Health and Safety (EH&S) requirements are understood by construction subcontractors and incorporated into their planning, procurement, and execution of construction work activities at NREL. It is important that all construction subcontractors and their lower-tiers subcontractors familiarize themselves with these requirements before

  2. GC GUIDANCE ON MINOR CONSTRUCTION THRESHOLDS

    Office of Environmental Management (EM)

    GUIDANCE ON MINOR CONSTRUCTION THRESHOLDS We have been asked about how the Department implements what is known as the "minor construction threshold," which limits the amount of certain funds that can be spent on minor construction projects that are not specifically authorized by law. This Guidance is intended to clarify both the applicable law and Department policy. The Secretary's authority to carry out construction projects is subject to several limitations in the Atomic Energy

  3. Constructing a Cleaner Economy Info Graphic

    Broader source: Energy.gov [DOE]

    An overview of the impact that the clean energy economy is having on the U.S. construction industry.

  4. Construction Safety Advisory Committee | Department of Energy

    Office of Environmental Management (EM)

    Safety Advisory Committee Construction Safety Advisory Committee CSAC Charter 1.0 PURPOSE This charter describes the function and role of the Department of Energy (DOE) Construction Safety Advisory Committee (CSAC). The DOE CSAC is an advisory body formed to provide the Office of Environment, Health, Safety and Security (AU) field input and perspective in the development and maintenance of DOE construction safety program guidance and in review and resolution of construction safety issues. The

  5. Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report

    Broader source: Energy.gov [DOE]

    The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States.

  6. Method of constructing an improved electrochemical cell

    DOE Patents [OSTI]

    Grimes, Patrick G. (Westfield, NJ); Einstein, Harry (Springfield, NJ)

    1984-10-09

    An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

  7. NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 An Act to authorize appropriations for fiscal year 2000 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe personnel strengths for such fiscal year for the Armed Forces, and for other purposes. PDF icon NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 More Documents

  8. Calendar Year 1996 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Calendar Year 1996 November 21, 1996 Special Report: IG-0398 Special Report on the Audit of the Management of Department of Energy Construction Projects November 15, 1996 Audit Report: WR-B-97-03 Audit of Groundwater Monitoring at Hanford November 7, 1996 Audit Report: WR-B-97-02 Audit of Bus Service Subsidies at the Idaho National Engineering Laboratory November 6, 1996 Audit Report: WR-B-97-01 Audit of Electrical System Construction Projects at the Nevada Operations Office October 22, 1996

  9. MHD Electrode and wall constructions

    DOE Patents [OSTI]

    Way, Stewart; Lempert, Joseph

    1984-01-01

    Electrode and wall constructions for the walls of a channel transmitting the hot plasma in a magnetohydrodynamic generator. The electrodes and walls are made of a plurality of similar modules which are spaced from one another along the channel. The electrodes can be metallic or ceramic, and each module includes one or more electrodes which are exposed to the plasma and a metallic cooling bar which is spaced from the plasma and which has passages through which a cooling fluid flows to remove heat transmitted from the electrode to the cooling bar. Each electrode module is spaced from and electrically insulated from each adjacent module while interconnected by the cooling fluid which serially flows among selected modules. A wall module includes an electrically insulating ceramic body exposed to the plasma and affixed, preferably by mechanical clips or by brazing, to a metallic cooling bar spaced from the plasma and having cooling fluid passages. Each wall module is, similar to the electrode modules, electrically insulated from the adjacent modules and serially interconnected to other modules by the cooling fluid.

  10. 50 Years of Space

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    50 Years of Space /science-innovation/_assets/images/icon-science.jpg 50 Years of Space Since 1943, some of the world's smartest and most dedicated technical people have accomplished the difficult, the unexpected, and what sometimes seems impossible at Los Alamos. LANL Top Science 2014 Faces of Science Radical Supercomputing Science Digests 70 Years of Innovations Top Ten Innovations of 2013 Energy Sustainability 50 Years of Space 50 YEARS OF SPACE Creating a safer, more secure tomorrow x x 1955

  11. 70 Years of Innovations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    70 Years of Innovations /about/_assets/images/icon-70th2.jpg Innovations: Celebrating 70 Years Since 1943, some of the world's smartest and most dedicated technical people have accomplished the difficult, the unexpected, and what sometimes seems impossible at Los Alamos. LANL Top Science 2014 Faces of Science Radical Supercomputing Science Digests 70 Years of Innovations Top Ten Innovations of 2013 Energy Sustainability 50 Years of Space 70 YEARS OF INNOVATIONS Addressing the nation's most

  12. Construction Branch Electrician & Lead Electrician | Princeton Plasma

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Lab Construction Branch Electrician & Lead Electrician Department: Engineering Supervisor(s): Frank Jones Staff: TSS 04 & 05 Requisition Number: 1600208 (POOL JOB, SOURCE REQUISITION) Position Summary: The Princeton University Plasma Physics Laboratory, a world-renowned fusion energy research center under contract with the U. S. Department of Energy is seeking to hire a: *Facilities Electrician (Grade, TSS 04, one-year term position) and a *Facilities LEAD Electrician (Grade,

  13. CONSTRUCTING THE NATIONAL Spherical Torus Experiment Upgrade took

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CONSTRUCTING THE NATIONAL Spherical Torus Experiment Upgrade took years of detailed planning and oversight. The team in charge brought decades of experience to the task, working together to make the $94 million upgrade a reality. Ron Strykowsky: Massive coordination of details for a massive project Ron Strykowsky compares his role as overall manager of the NSTX-U project to that of an orchestra leader conducting a team of expert musicians. Strykowsky coordinated all the engineers and techni-

  14. Imagine Homes New Construction Occupied Test House

    SciTech Connect (OSTI)

    Stecher, D.; Rapport, A.; Allison, K.

    2013-07-01

    This report summarizes the research findings of a long-term monitoring plan to evaluate the performance of an energy-efficient home constructed in 2010 in San Antonio, Texas. Monitoring of the energy use, energy generation, and temperature conditions for this project occurred between July 2010 and October 2011. The heating, ventilation, and air conditioning system effectively maintained acceptable temperatures and humidity levels in peak cooling and heating and non-peak operating periods. Discrepancies were found between modeled and actual energy use values, with actual space cooling energy use closest to the corresponding modeled value. Energy consumption predicted for lighting, appliances, and miscellaneous electrical loads was significantly higher than measured amounts, and energy consumption predicted for cooling was significantly lower than measured amounts. A high amount of the 1,600 kWh of PV-generated electricity produced annually was sent to the electric grid every month. The solar thermal DHW system was the main source of hot water for most of the year and performed well; during summer, electrical use by the backup system was rare.

  15. FY 2015 Ten Year Site Plan-Limited Update Los Alamos National...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    115 million in material and construction costs over a 23-year period. Omega Bridge Refurbishment: The Omega Bridge is annually inspected by a certified Federal Highway...

  16. Construction Readiness RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Readiness RM Construction Readiness RM The authorization to proceed with construction of a new facility is given at the CD-3 phase of the project management cycle, after completion of the final design. Between CD-3 and CD-4 stages of the project, procurement and construction and/or assembly of facility structures, systems and equipment is conducted. These activities can present significant hazards to workers and involve a complex set of events that must be carefully planned and sequenced. PDF

  17. FAQS Reference Guide – Construction Management

    Office of Energy Efficiency and Renewable Energy (EERE)

    This reference guide addresses the competency statements in the March 2004 edition of DOE-STD-1180-2004, Construction Management Functional Area Qualification Standard.

  18. Catawba County- Green Construction Permitting Incentive Program

    Broader source: Energy.gov [DOE]

    Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

  19. Nevada Construction Stormwater Factsheet | Open Energy Information

    Open Energy Info (EERE)

    sheet for Nevada's General Storm Water Construction Permit. Author Nevada Division of Environmental Protection Published NDEP, 2007 DOI Not Provided Check for DOI availability:...

  20. Colorado Air Pollution Control Division - Construction Permits...

    Open Energy Info (EERE)

    Pollution Control Division - Construction Permits Forms and Air Pollutant Emission Notices (APENs) Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site:...

  1. Hawaii Well Construction & Pump Installation Standards Webpage...

    Open Energy Info (EERE)

    Standards Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Well Construction & Pump Installation Standards Webpage Abstract This webpage...

  2. Small business success story: Lindblad Construction | Argonne...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    led by Argonne National Laboratory." Lindblad has demonstrated how a small business can deliver high-quality construction services at a cost-effective price to not only ...

  3. Austin Energy- Commercial New Construction Efficiency Rebates

    Broader source: Energy.gov [DOE]

    Austin Energy offers incentives for the construction and major renovation of commercial buildings within its service territory. The program rewards customers by using a tiered payment format, which...

  4. Minnesota Power - Residential New Construction Rebate Program...

    Broader source: Energy.gov (indexed) [DOE]

    Construction Residential Savings Category Solar Photovoltaics Geothermal Heat Pumps Clothes Washers RefrigeratorsFreezers Dehumidifiers Water Heaters Heat Pumps Air conditioners...

  5. Construction Safety Engineer (Term Position) | Princeton Plasma...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction Safety Engineer (Term Position) Department: ESH&S Supervisor(s): Bill Slavin Requisition Number: 1500802 Position Summary: Associated with the IOI (Infrastructure &...

  6. Wanzek Construction Inc | Open Energy Information

    Open Energy Info (EERE)

    Inc Jump to: navigation, search Name: Wanzek Construction, Inc. Place: Fargo, North Dakota Zip: 58103 Sector: Renewable Energy, Wind energy Product: Fargo (North Dakota)-based...

  7. CRAD, Nuclear Facility Construction - Mechanical Equipment -...

    Broader source: Energy.gov (indexed) [DOE]

    Nuclear Facility Construction - Mechanical Equipment Installation, (HSS CRAD 45-53, Rev. 0) This Criteria Review and Approach Document (HSS CRAD 45-53) establishes review criteria...

  8. Roseville Electric- Residential New Construction Rebate Program

    Broader source: Energy.gov [DOE]

    Roseville Electric provides financial incentives to encourage local builders to construct energy efficient homes which incorporate  photovoltaics (PV). Participating builders can choose from three...

  9. Satluj Constructions Ltd | Open Energy Information

    Open Energy Info (EERE)

    Ltd. Place: Chandigarh, Himachal Pradesh, India Sector: Hydro Product: Chandigarh-based small hydro project developer. References: Satluj Constructions Ltd.1 This article is a...

  10. Example Cost Codes for Construction Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter provides an example outline of cost items and their corresponding cost codes that may be used for construction projects.

  11. Hawaii Well Construction & Pump Installation Standards | Open...

    Open Energy Info (EERE)

    Handbook Abstract This document provides an overview of the well construction and pump installation standards in Hawaii. Author State of Hawaii Commission on Water Resource...

  12. Washington Environmental Permit Handbook - NPDES Construction...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Washington Environmental Permit Handbook - NPDES Construction Stormwater...

  13. ODEQ - Construction Stormwater Application and Forms Manual ...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: ODEQ - Construction Stormwater Application and Forms ManualPermitting...

  14. Labor Standards for Construction | Department of Energy

    Energy Savers [EERE]

    for Construction More Documents & Publications Chapter 23 - Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety, and Drug-free Workplace....

  15. CXD 4606, 9831 Wall Construction Project (4606)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9831 Wall Construction Project (4606) Y-12 Site Office Oak Ridge, Anderson County, Tennessee The proposed action is to upgrade of the existing contamination area associated with an...

  16. ODEQ - Construction Stormwater Best Management Practices Manual...

    Open Energy Info (EERE)

    Best Management Practices Manual Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: ODEQ - Construction Stormwater...

  17. Secretary Moniz's First Year

    Broader source: Energy.gov [DOE]

    We're looking back at some of the biggest moments from Energy Secretary Ernest Moniz's first year in office.

  18. MinorConstructionThresholdGuidance.PDF | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MinorConstructionThresholdGuidance.PDF MinorConstructionThresholdGuidance.PDF PDF icon MinorConstructionThresholdGuidance.PDF More Documents & Publications Audit Report:...

  19. Construction Safety Advisory Committee- Membership Roster

    Broader source: Energy.gov [DOE]

    CSAC members shall consist of DOE and DOE contractor employees whose normal job duties include program management or operational direction of construction safety. Members shall be nominated by their management based on their construction safety expertise and on the needs of the committee.

  20. 2013 Year in Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Year in Review i 2013 YIR May 2014 Year-in-Review: 2013 Energy Infrastructure Events and Expansions Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S. Department of Energy DOE / 2013 Year in Review ii 2013 YIR For Further Information This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and William Bryan, Deputy Assistant Secretary. Specific

  1. 70 years after Trinity

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    70 years after Trinity 70 years after Trinity Though the world has seen many changes since Trinity, one thing has remained constant: Los Alamos remains essential to our nation's security. banner 70 years after Trinity An Opinion Piece by Laboratory Director Charles McMillan Charles McMillan, Director Seventy years ago on July 16, scientists with the Manhattan Project tested the Trinity gadget-the first atomic bomb-in the desert outside of Alamogordo, NM. The pre-dawn flash of light that mimicked

  2. Sustainability in Federal Building New Construction and Major...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sustainable Buildings & Campuses Sustainability in Federal Building New Construction and Major Renovations Sustainability in Federal Building New Construction and Major ...

  3. Oak Ridge Facilities Construction | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities ... Oak Ridge Facilities Construction Work in wet and mud was common during the construction of Oak Ridge facilities...

  4. World pipeline construction patterns shifting away from big North American gas lines

    SciTech Connect (OSTI)

    Koen, A.D.; True, W.R.

    1992-02-10

    The pattern of world pipeline construction has begun to shift away from large diameter gas lines in North America. Total miles of gas pipelines planned this year and beyond have registered big increases in Europe and Asia- Pacific regions, more than offsetting decreased mileage of planned U.S. and Canadian gas projects. World products pipeline construction planned in 1992 and beyond shows the largest year to year gain, paced by projects in Latin America. Those are among highlights of this article. Many projects only under study or unlikely to be built are excluded from final mileage tallies.

  5. Final Year Project Report

    SciTech Connect (OSTI)

    Hubsch, Tristan

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  6. Manhattan Project: Y-12 Construction, 1943

    Office of Scientific and Technical Information (OSTI)

    Groundbreaking for Y-12, Oak Ridge Y-12: CONSTRUCTION (Oak Ridge: Clinton, 1943) Events > The Uranium Path to the Bomb, 1942-1944 Y-12: Design, 1942-1943 Y-12: Construction, 1943 Y-12: Operation, 1943-1944 Working K-25 into the Mix, 1943-1944 The Navy and Thermal Diffusion, 1944 Groundbreaking for the Alpha plant of the Y-12 Electromagnetic Plant took place at Oak Ridge on February 18, 1943 (right). Soon blueprints could not be produced fast enough to keep up with construction as Stone &

  7. Construction progress of the RHIC electron lenses

    SciTech Connect (OSTI)

    Fischer W.; Altinbas, Z.; Anerella, M.; Beebe, E.; et al

    2012-05-20

    In polarized proton operation the RHIC performance is limited by the head-on beam-beam effect. To overcome this limitation two electron lenses are under construction. We give an overview of the construction progress. Guns, collectors and the warm electron beam transport solenoids with their power supplies have been constructed. The superconducting solenoids that guide the electron beam during the interaction with the proton beam are near completion. A test stand has been set up to verify the performance of the gun, collector and some of the instrumentation. The infrastructure is being prepared for installation, and simulations continue to optimize the performance.

  8. IWTU Construction Workers Set Largest Process Vessel

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IWTU Construction Workers Set Largest Process Vessel Click on image to enlarge Construction of the Integrated Waste Treatment Unit (IWTU) took a major step forward on Sept. 2, 2009 as crews lifted into place the largest of the six process vessels that will be used to treat radioactive liquid waste stored at the site. The IWTU will use a steam reforming process to solidify the waste for eventual shipment out of Idaho. The vessel and its skid, or framework, were constructed at Premier Technologies

  9. CPS Energy- New Residential Construction Incentives

    Broader source: Energy.gov [DOE]

    CPS Energy offers incentives for new residential construction that is at least 15% more efficient than required by the City of San Antonio Building Code (based on IECC 2009). The building code and...

  10. Low-rise Residential New Construction Program

    Broader source: Energy.gov [DOE]

     NYSERDA’s Low-rise Residential New Construction Programs are designed to encourage more industry involvement in the building of single-family homes and low-rise residential units that are more...

  11. DNA Assembly Line for Nano-Construction

    ScienceCinema (OSTI)

    Oleg Gang

    2010-01-08

    Building on the idea of using DNA to link up nanoparticles scientists at Brookhaven National Lab have designed a molecular assembly line for high-precision nano-construction. Nanofabrication is essential for exploiting the unique properties of nanoparticl

  12. Self-assembling multimeric nucleic acid constructs

    DOE Patents [OSTI]

    Cantor, Charles R. (Boston, MA); Niemeyer, Christof M. (Bremen, DE); Smith, Cassandra L. (Boston, MA); Sano, Takeshi (Boston, MA); Hnatowich, Donald J. (Brookline, MA); Rusckowski, Mary (Southborough, MA)

    1999-10-12

    The invention is directed to constructs and compositions containing multimeric forms of nucleic acid. Multimeric nucleic acids comprise single-stranded nucleic acids attached via biotin to streptavidin and bound with a functional group. These constructs can be utilized in vivo to treat or identify diseased tissue or cells. Repeated administrations of multimeric nucleic acid compositions produce a rapid and specific amplification of nucleic acid constructs and their attached functional groups. For treatment purposes, functional groups may be toxins, radioisotopes, genes or enzymes. Diagnostically, labeled multimeric constructs may be used to identify specific targets in vivo or in vitro. Multimeric nucleic acids may also be used in nanotechnology and to create self-assembling polymeric aggregates such as membranes of defined porosity, microcircuits and many other products.

  13. Self-assembling multimeric nucleic acid constructs

    DOE Patents [OSTI]

    Cantor, Charles R. (Boston, MA); Niemeyer, Christof M. (Bremen, DE); Smith, Cassandra L. (Boston, MA); Sano, Takeshi (Boston, MA); Hnatowich, Donald J. (Brookline, MA); Rusckowski, Mary (Southborough, MA)

    1996-01-01

    The invention is directed to constructs and compositions containing multimeric forms of nucleic acid. Multimeric nucleic acids comprise single-stranded nucleic acids attached via biotin to streptavidin and bound with a functional group. These constructs can be utilized in vivo to treat or identify diseased tissue or cells. Repeated administrations of multimeric nucleic acid compositions produce a rapid and specific amplification of nucleic acid constructs and their attached functional groups. For treatment purposes, functional groups may be toxins, radioisotopes, genes or enzymes. Diagnostically, labeled multimeric constructs may be used to identify specific targets in vivo or in vitro. Multimeric nucleic acids may also be used in nanotechnology and to create self-assembling polymeric aggregates such as membranes of defined porosity, microcircuits and many other products.

  14. CPS Energy- New Residential Construction Incentives

    Broader source: Energy.gov [DOE]

    CPS Energy offers incentives for new residential construction that is at least 15% more efficient than required by the [http://dsireusa.org/incentives/incentive.cfm?Incentive_Code=TX29R&re=1...

  15. CPS Energy- New Commercial Construction Incentives

    Broader source: Energy.gov [DOE]

    CPS Energy offers incentives for new commercial construction that is at least 15% more efficient than required by the City of San Antonio Building Code (based on IECC 2009). The building code and...

  16. Self-assembling multimeric nucleic acid constructs

    DOE Patents [OSTI]

    Cantor, C.R.; Niemeyer, C.M.; Smith, C.L.; Sano, Takeshi; Hnatowich, D.J.; Rusckowski, M.

    1996-10-01

    The invention is directed to constructs and compositions containing multimeric forms of nucleic acid. Multimeric nucleic acids comprise single-stranded nucleic acids attached via biotin to streptavidin and bound with a functional group. These constructs can be utilized in vivo to treat or identify diseased tissue or cells. Repeated administrations of multimeric nucleic acid compositions produce a rapid and specific amplification of nucleic acid constructs and their attached functional groups. For treatment purposes, functional groups may be toxins, radioisotopes, genes or enzymes. Diagnostically, labeled multimeric constructs may be used to identify specific targets in vivo or in vitro. Multimeric nucleic acids may also be used in nanotechnology and to create self-assembling polymeric aggregates such as membranes of defined porosity, microcircuits and many other products. 5 figs.

  17. New Construction Commercial Reference Buildings Archive

    Broader source: Energy.gov [DOE]

    Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

  18. Both construction and operations continue to increase

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Both construction and operations continue to increase As mentioned earlier, Building 9731 was the first building completed at Y-12, having been completed in just a few weeks in March 1943. It was quickly constructed so operational checkout could begin on the calutrons being designed at Berkeley by Lawrence. Training had been done at Berkeley as well with several folks from Y-12 actually going to California to learn how to operate the calutrons. When Building 9731 was completed and the calutrons

  19. Parsons Salt Water Processing Facility Construction Project

    Office of Environmental Management (EM)

    Parsons Corporation Salt Waste Processing Facility Construction Project Report from the Department of Energy Voluntary Protection Program Onsite Review February 5-14, 2013 U.S. Department of Energy Office of Health, Safety and Security Office of Health and Safety Office of Worker Safety and Health Assistance Washington, DC 20585 Parsons Corporation SWPF Construction Project DOE-VPP Onsite Review February 2013 Foreword The Department of Energy (DOE) recognizes that true excellence can be

  20. Construction Contractor Checklist | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction Contractor Checklist For small businesses seeking contracting opportunities with Argonne in the construction/demolition field, please be sure you have taken the following steps in advance of receiving a contract solicitation to ensure you are in a position to make a successful bid: Determine whether your company is a small business. Check the North American Industrial Classification System (NAICS) codes for your industry and the related size standard and gross revenue standards.

  1. Existing Commercial Reference Buildings Constructed Before 1980 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Before 1980 Existing Commercial Reference Buildings Constructed Before 1980 The files on this page contain commercial reference building models for existing buildings constructed before 1980, organized by building type and location. These U.S. Department of Energy (DOE) reference buildings are complete descriptions for whole building energy analysis. You can also return to a summary of building types and climate zones and information about other building vintages. These

  2. Electrode Construction and Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electrode Construction and Analysis Electrode Construction and Analysis 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C. PDF icon es_16_battaglia.pdf More Documents & Publications Performance and Degradation Modeling of Batteries Scale-up and Testing of Advanced Materials from the BATT Program Vehicle Technologies Office Merit Review 2015: Continuum Modeling as a Guide to Developing New Batte

  3. Building America Partnership for Improved Residential Construction |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Partnership for Improved Residential Construction Building America Partnership for Improved Residential Construction In addition to occupied test homes, research will be conducted in highly instrumented laboratories with simulated occupancy. Shown here are the two identical, side-by-side test homes that comprise FSEC's Flexible Residential Test Facility. Photo courtesy of Florida Solar Energy Center. In addition to occupied test homes, research will be conducted in

  4. Construction Consultants, L.I., Inc.

    Office of Environmental Management (EM)

    Mr. Eric Baumack Senior Project Manager Construction Consultants L.I., Inc. 36 East 2 nd Street Riverhead, New York 11901 WEL-2015-05 Dear Mr. Baumack: The Office of Enterprise Assessments' Office of Enforcement has completed an investigation into an electrical shock incident involving a worker employed by a subcontractor to Construction Consultants L.I., Inc. (CCLI) at the Brookhaven National Laboratory (BNL). CCLI is a first-tier subcontractor to Brookhaven Science Associates, LLC (BSA),

  5. Construction Worker Screening Projects | Department of Energy

    Office of Environmental Management (EM)

    Worker Screening Projects Construction Worker Screening Projects Sites listed below are the primary DOE sites served. Construction workers from DOE sites not listed below are covered by the Building Trades National Medical Screening Program (BTMed). Additional information regarding BTMed can be found on their website or by calling 1-800-866-9663. Alaska: Amchitka California: Lawrence Berkeley National Laboratory Lawrence Livermore National Laboratory Sandia National Laboratories (Livermore, CA)

  6. Allocation Year Rollover process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Allocatio Year Rollover process Allocation Year Rollover process December 23, 2013 by Francesca Verdier Allocation Year 2013 (AY13) ends at 23:59:59 on Monday, January 13, 2014. AY14 runs from Tuesday, January 14, 2014 through Monday, January 12, 2015. The major features of the rollover are: charging acroess the AY boundary: All batch jobs will continue running during the rollover. Time accrued before midnight will be charged to AY13 repos; time accrued after midnight will be charged to AY14

  7. Buildings Energy Data Book: 1.3 Value of Construction and Research

    Buildings Energy Data Book [EERE]

    2 Value of New Building Construction Relative to GDP, by Year ($2010 Billion) Value of New Construction Put in Place Bldgs. Percent of Residential Commercial (1) All Bldgs. (1) GDP Total U.S. GDP 1980 5.0% 1985 5.8% 1990 4.9% 1995 4.4% 2000 5.2% 2005 6.0% 2006 5.9% 2007 5.2% 2008 4.4% 2009 3.3% 2010 2.6% Note(s): Source(s): 129.8 247.7 377.4 14,660 1) New buildings construction differs from Table 1.3.2 by excluding industrial building construction. DOC, Current Construction Reports: Value of New

  8. Constructing earth sheltered housing with concrete

    SciTech Connect (OSTI)

    Spears, R.E.

    1981-01-01

    This manual provides a state - of - the - art review of the design and construction of an earth - sheltered house using cast - in - place concrete, precast concrete, and concrete masonry. Based on a literature survey, theoretical work, and discussions with researchers and engineers in the concrete industry, the text is designed for use by architects, engineers, and homebuilders. The features of concrete construction that are current accepted practice for the concrete products discussed are shown to be applicable with reasonable care to building a safe, dry, and comfortable earth - sheltered house. The main considerations underlying the recommendations were the use of the earth's mass and passive solar effects to minimize energy needs, the structural capacity of the separate concrete products and their construction methods, and drainage principles and waterproofing details. Shelter ranging from those with at least 2 feet of earth cover to those with an uncovered roof of usual construction are included. To be considered an earth - sheltered residential building, at least half of the exterior wall and roof area that is in direct contact with the conditioned living space must be sheltered from the environment by earth berm or earthfill. Siting considerations, the fundamentals of passive solar heating, planning considerations, and structural considerations are discussed. Detailed guidelines are provided on concrete masonry construction, joint details in walls and floors, waterproofing, formwork and form removal, concrete construction practices, concrete masonry, and surface finishes. Numerous illustrations, tables, and a list of 32 references are provided. (Author abstract modified).

  9. Welcome Year in Review

    National Nuclear Security Administration (NNSA)

    Training Meeting Orlando, Florida-May 23-25, 2006 Sponsored by the U.S. Department of Energy & the U.S. Nuclear Regulatory Commission Welcome & Year In Review Peter Dessaules...

  10. SPALLATION NEUTRON SOURCE RING-DESIGN AND CONSTRUCTION SUMMARY.

    SciTech Connect (OSTI)

    WEI,J.

    2005-05-16

    After six years, the delivery of components for the Spallation Neutron Source (SNS) accumulator ring (AR) and the transport lines was completed in Spring 2005. Designed to deliver 1.5 MW beam power (1.5 x 10{sup 14} protons of 1 GeV kinetic energy at a repetition rate of 60 Hz), stringent measures were implemented in the fabrication, test, and assembly to ensure the quality of the accelerator systems. This paper summarizes the design, R&D, and construction of the ring and transport systems.

  11. Buildings Energy Data Book: 2.2 Residential Sector Characteristics

    Buildings Energy Data Book [EERE]

    7 Characteristics of a Typical Single-Family Home (1) Year Built | Building Equipment Fuel Age (5) Occupants 3 | Space Heating Natural Gas 12 Floorspace | Water Heating Natural Gas 8 Heated Floorspace (SF) 1,934 | Space Cooling 8 Cooled Floorspace (SF) 1,495 | Garage 2-Car | Stories 1 | Appliances Size Age (5) Foundation Concrete Slab | Refrigerator 19 Cubic Feet 8 Total Rooms (2) 6 | Clothes Dryer Bedrooms 3 | Clothes Washer Other Rooms 3 | Range/Oven Full Bathroom 2 | Microwave Oven Half

  12. Buildings Energy Data Book: 1.3 Value of Construction and Research

    Buildings Energy Data Book [EERE]

    7 Buildings Design and Construction Trades, by Year | | | 1980 | 1982 14.4 1990 | 1987 38.4 2000 (4) | 1992 36.3 2005 | 1997 46.6 2006 | 2002 95.4 2007 | 2007 52.4 2008 | 2009 | 2010 | Note(s): Source(s): 1) Does not include industrial building or heavy construction (e.g., dam and bridge building). In 1999, 76% of the employment shown is considered for "production." The entire U.S. construction industry employs an estimated 10 million people, including manufacturing. 2) In 2000, NAHB

  13. YEAR IN REVIEW

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Amped Up Newsletter Volume 1, No. 1 | February 2015 2014 ANNUAL REPORT 2014 YEAR IN REVIEW Volume 1, No. 1, January/February 2015 What's Happening @ EERE IN THIS ISSUE A Message from Dave.......................................... 2 EERE All Hands Meeting ..................................... 3 Staffing Update ..................................................... 4 2014 Success Stories .......................................... 6 Sustainable Transportation ............................ 6 Renewable

  14. Department of Energy Construction Safety Reference Guide

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    DOE has adopted the Occupational Safety and Health Administration (OSHA) regulations Title 29 Code of Federal Regulations (CFR) 1926 ``Safety and Health Regulations for Construction,`` and related parts of 29 CFR 1910, ``Occupational Safety and Health Standards.`` This nonmandatory reference guide is based on these OSHA regulations and, where appropriate, incorporates additional standards, codes, directives, and work practices that are recognized and accepted by DOE and the construction industry. It covers excavation, scaffolding, electricity, fire, signs/barricades, cranes/hoists/conveyors, hand and power tools, concrete/masonry, stairways/ladders, welding/cutting, motor vehicles/mechanical equipment, demolition, materials, blasting, steel erection, etc.

  15. EA-1997: Construction Landfill Expansion, Pantex Plant, Amarillo, Texas |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 7: Construction Landfill Expansion, Pantex Plant, Amarillo, Texas EA-1997: Construction Landfill Expansion, Pantex Plant, Amarillo, Texas SUMMARY Construction Landfill Expansion, Pantex Plant, Amarillo, Texas

  16. 31 Tannery Road- Ferreira Construction Headquarters

    High Performance Buildings Database

    Branchburg, NJ The 31 Tannery project, located in Branchburg, New Jersey, is the corporate headquarters for Ferreira Construction and Ferreira Group. The facility is 42,000 square feet and serves as office space, shop, and living lab. This state-of-the-art facility raises the bar for a commercial high-performance building, with an eye towards energy independence.

  17. Departments of the Navy, Energy and Agriculture Invest in Construction...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Agriculture Invest in Construction of Three Biorefineries to Produce Drop-In Biofuel for Military Departments of the Navy, Energy and Agriculture Invest in Construction of ...

  18. Building America Webinar: New Construction Hybrid-Ductless Heat...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Construction Hybrid-Ductless Heat Pumps Study: Resistance is Futile Building America Webinar: New Construction Hybrid-Ductless Heat Pumps Study: Resistance is Futile This ...

  19. Seeking Information on Design and Construction of High-Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Seeking Information on Design and Construction of High-Performance Tenant Spaces Seeking Information on Design and Construction of High-Performance Tenant Spaces August 3, 2015 -...

  20. Pepco Update on Current Construction Work and Mirant Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Pepco Update on Current Construction Work and Mirant Generation Needs for...

  1. Colorado Construction Air Permit Application | Open Energy Information

    Open Energy Info (EERE)

    for a construction permit for construction of a commercial or industrial source of air pollution. Form Type ApplicationNotice Form Topic Air Pollution Control Division -...

  2. DOE Signing Paves the Way for Funding, Construction of Innovative...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Signing Paves the Way for Funding, Construction of Innovative Clean Coal Plant in Florida DOE Signing Paves the Way for Funding, Construction of Innovative Clean Coal Plant in ...

  3. President Obama Announces Loan Guarantees to Construct New Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Loan Guarantees to Construct New Nuclear Power Reactors in Georgia President Obama Announces Loan Guarantees to Construct New Nuclear Power Reactors in Georgia February 16, 2010 - ...

  4. Qinghai Yulong Hydropower Construction Co Ltd | Open Energy Informatio...

    Open Energy Info (EERE)

    Yulong Hydropower Construction Co Ltd Jump to: navigation, search Name: Qinghai Yulong Hydropower Construction Co., Ltd. Place: Xining, Qinghai Province, China Zip: 810001 Sector:...

  5. Langao Lanjiang Hydropower Construction and Development Co Ltd...

    Open Energy Info (EERE)

    Lanjiang Hydropower Construction and Development Co Ltd Jump to: navigation, search Name: Langao Lanjiang Hydropower Construction and Development Co., Ltd. Place: Xi'an, Shaanxi...

  6. Hebei Construction Investment New Energy Corporation HECIC New...

    Open Energy Info (EERE)

    Construction Investment New Energy Corporation HECIC New Energy Jump to: navigation, search Name: Hebei Construction Investment New Energy Corporation (HECIC New Energy) Place:...

  7. File:Texas Construction General Permit (TXR150000).pdf | Open...

    Open Energy Info (EERE)

    Texas Construction General Permit (TXR150000).pdf Jump to: navigation, search File File history File usage Metadata File:Texas Construction General Permit (TXR150000).pdf Size of...

  8. UPDES Storm Water Permits: General Construction Website | Open...

    Open Energy Info (EERE)

    Storm Water Permits: General Construction Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: UPDES Storm Water Permits: General Construction...

  9. Housing and Construction Holding Company | Open Energy Information

    Open Energy Info (EERE)

    Housing and Construction Holding Company Jump to: navigation, search Name: Housing and Construction Holding Company Place: Ramat-Gan, Israel Zip: 52215 Product: Israel-based...

  10. Zhangye Heihe Hyaulic and Hydropower Construction Co Ltd | Open...

    Open Energy Info (EERE)

    Heihe Hyaulic and Hydropower Construction Co Ltd Jump to: navigation, search Name: Zhangye Heihe Hyaulic and Hydropower Construction Co., Ltd Place: Gansu Province, China Zip:...

  11. Oregon Construction/Installation Permit for Onsite Wastewater...

    Open Energy Info (EERE)

    ConstructionInstallation Permit for Onsite Wastewater Treatment System Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Construction...

  12. Construction on Pantex High Explosives Pressing Facility Reaches...

    National Nuclear Security Administration (NNSA)

    Field Offices Welcome to the NNSA Production Office NPO News Releases Construction on Pantex High Explosives Pressing Facility ... Construction on Pantex High Explosives...

  13. Texas Construction General Permit (TXR1500000) | Open Energy...

    Open Energy Info (EERE)

    Construction General Permit (TXR1500000) Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Texas Construction General Permit (TXR1500000) Published...

  14. Harisons Hydel Construction Co Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    Harisons Hydel Construction Co Pvt Ltd Jump to: navigation, search Name: Harisons Hydel Construction Co. Pvt. Ltd. Place: Kullu, Himachal Pradesh, India Zip: 175101 Sector: Hydro...

  15. Chapter 22 - Labor Standards for Construction | Department of...

    Office of Environmental Management (EM)

    2 - Labor Standards for Construction Chapter 22 - Labor Standards for Construction Chapter 22.1 - Labor Standards More Documents & Publications Department of Energy (DOE)...

  16. POSCO Engineering Construction Co Ltd POSCO E C | Open Energy...

    Open Energy Info (EERE)

    Engineering Construction Co Ltd POSCO E C Jump to: navigation, search Name: POSCO Engineering & Construction Co Ltd (POSCO E&C) Place: Gyeongsangbuk-Do, Korea (Republic) Zip:...

  17. Washington Construction Storm Water General Permit | Open Energy...

    Open Energy Info (EERE)

    Construction Storm Water General Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Washington Construction Storm Water General...

  18. Longnan Dongcheng Construction Group Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Dongcheng Construction Group Co Ltd Jump to: navigation, search Name: Longnan Dongcheng Construction Group Co., Ltd Place: Longnan, Gansu Province, China Zip: 742500 Sector: Hydro...

  19. Texas Small Construction Site Notice | Open Energy Information

    Open Energy Info (EERE)

    Small Construction Site Notice Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Texas Small Construction Site Notice Published Texas Commission on...

  20. Longnan Jingcheng Engineering Construction Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Jingcheng Engineering Construction Co Ltd Jump to: navigation, search Name: Longnan Jingcheng Engineering & Construction Co., Ltd Place: Longnan, Gansu Province, China Zip: 746010...

  1. Qinghai Shengyuan Construction Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Shengyuan Construction Co Ltd Jump to: navigation, search Name: Qinghai Shengyuan Construction Co., Ltd Place: Xining, Qinghai Province, China Zip: 810007 Sector: Hydro Product:...

  2. Chongqing Shipping Construction Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Shipping Construction Development Co Ltd Jump to: navigation, search Name: Chongqing Shipping Construction Development Co., Ltd. Place: Chongqing, Chongqing Municipality, China...

  3. Managing Design and Construction Using Systems Engineering for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, Managing Design and Construction Using Systems Engineering for Use with DOE O 413.3A by Roland Frenck Functional areas: Construction and Engineering, Program Management This...

  4. MSA Apparatus Construction for Chemical Equipment Ltd | Open...

    Open Energy Info (EERE)

    MSA Apparatus Construction for Chemical Equipment Ltd Jump to: navigation, search Name: MSA Apparatus Construction for Chemical Equipment Ltd Place: United Kingdom Sector: Hydro,...

  5. AZPDES Construction General Permit Fact Sheet | Open Energy Informatio...

    Open Energy Info (EERE)

    AZPDES Construction General Permit Fact Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions: AZPDES Construction...

  6. Building America Webinar: New Construction Hybrid-Ductless Heat...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building America Webinar: New Construction Hybrid-Ductless Heat Pumps Study: Resistance is Futile Building America Webinar: New Construction Hybrid-Ductless Heat Pumps Study:...

  7. A Posteriori Error Analysis and Adaptive Construction of Surrogate...

    Office of Scientific and Technical Information (OSTI)

    Posteriori Error Analysis and Adaptive Construction of Surrogate Models. Citation Details In-Document Search Title: A Posteriori Error Analysis and Adaptive Construction of...

  8. Sample Contract Language for Construction Using Energy-Efficient...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sample Contract Language for Construction Using Energy-Efficient Products Sample Contract Language for Construction Using Energy-Efficient Products Document covers sample language ...

  9. Hythane project by Hydrogen China Ltd and China Railway Construction...

    Open Energy Info (EERE)

    project by Hydrogen China Ltd and China Railway Construction Corporation Jump to: navigation, search Name: Hythane project by Hydrogen China Ltd and China Railway Construction...

  10. IOI Construction Field Manager | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a wealth of first hand field experience managing construction analyses, site logistics, construction safety, trade management, scheduling and commissioning the quality...

  11. Training on PV Systems: Design, Construction, Operation and Maintenanc...

    Open Energy Info (EERE)

    on PV Systems: Design, Construction, Operation and Maintenance Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Training on PV Systems: Design, Construction, Operation...

  12. File:06FDAEPAConstructionGeneralPermitConstructionStormwater...

    Open Energy Info (EERE)

    06FDAEPAConstructionGeneralPermitConstructionStormwater.pdf Jump to: navigation, search File File history File usage Metadata File:06FDAEPAConstructionGeneralPermitConstructionStor...

  13. Anaheim Public Utilities- Commercial & Industrial New Construction Rebate Program

    Broader source: Energy.gov [DOE]

    Anaheim Public Utilities (APU) offers commercial, industrial, and institutional customers the New Construction Incentives Program to offset construction and installation costs of energy efficient...

  14. Buildings Energy Data Book: 3.5 Commercial Builders and Construction

    Buildings Energy Data Book [EERE]

    1 Value of New Commercial Building Construction, by Year ($2010 Billion) 1980 159.8 2.5% 1985 226.3 3.0% 1990 227.2 2.6% 1995 203.8 2.0% 2000 312.7 2.5% 2005 302.2 2.2% 2006 334.7 2.3% 2007 383.3 2.6% 2008 399.6 2.7% 2009 328.5 2.3% 2010 257.5 1.8% Source(s): 14,639 14,639 14,254 14,660 DOC, Current Construction Reports: Value of New Construction Put in Place, C30, Aug. 2003, Table 1 for 1980-1990; DOC, Annual Value of Private Construction Put in Place, Aug. 2008 for 1995-2000; DOC, Annual Value

  15. Released: June 2006

    U.S. Energy Information Administration (EIA) Indexed Site

    . Summary Table: Totals and Medians of Floorspace, Number of Workers, and Hours of Operation for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)","Total Floorspace (million square feet)","Total Workers in All Buildings (thousand)","Median Square Feet per Building (thousand)","Median Square Feet per Worker","Median Hours per Week","Median Age of Buildings (years)" "All Buildings*

  16. Impacts of Rising Construction and Equipment Costs on Energy Industries (released in AEO2007)

    Reports and Publications (EIA)

    2007-01-01

    Costs related to the construction industry have been volatile in recent years. Some of the volatility may be related to higher energy prices. Prices for iron and steel, cement, and concrete -- commodities used heavily in the construction of new energy projects -- rose sharply from 2004 to 2006, and shortages have been reported. How such price fluctuations may affect the cost or pace of new development in the energy industries is not known with any certainty, and short-term changes in commodity prices are not accounted for in the 25-year projections in Annual Energy Outlook 2007. Most projects in the energy industries require long planning and construction lead times, which can lessen the impacts of short-term trends.

  17. Construction of the BNL EBIS preinjector

    SciTech Connect (OSTI)

    Alessi,J.; Barton, D.; Beebe, E.; Bellavia, S.; Gould, O.; Kponou, A.; Lambiase, R.; Lessard, E.; Lockey, R.; LoDestro, V.; Mapes, M.; McCafferty, D.; McNerney, A.; Okamura, M.; Pendzick, A.; Phillips, D.; Pikin, A. I.; Raparia, D.; Ritter, J.; Scaduto, J.; Snydstrup, L.; Wilinski, M.; Zaltsman, A. et al.

    2009-05-04

    A new heavy ion preinjector, consisting of an Electron Beam Ion Source (EBIS), an RFQ, and IH linac, is under construction at Brookhaven National Laboratory. This preinjector win provide ions of any species at an energy of 2 MeV/u, resulting in increased capabilities for the Relativistic Heavy Ion Collider, and the NASA Space Radiation Laboratory programs. The RF'Q has been commissioned with beam, and most of the remaining elements are either installed or being assembled.

  18. Composite construction for nuclear fuel containers

    DOE Patents [OSTI]

    Cheng, B. C.; Rosenbaum, H. S.; Armijo, J. S.

    1987-04-21

    Disclosed is an improved method for producing nuclear fuel containers of a composite construction having components providing therein a barrier system for resisting destructive action by volatile fission products or impurities and also interdiffusion of metal constituents, and the product thereof. The composite nuclear fuel containers of the method comprise a casing of zirconium or alloy thereof with a layer of copper overlying an oxidized surface portion of the zirconium or alloy thereof. 1 fig.

  19. Portsmouth and Paducah Construction Workers Needs Assessment

    Office of Environmental Management (EM)

    Needs Assessment for Medical Screening of Construction Workers at the Portsmouth and Paducah Gaseous Diffusion Plants Introduction In 1993 the U.S. Congress enacted Section 3162 of the Defense Authorization Act, which directed the Department of Energy (DOE) to initiate programs to evaluate the health of former DOE defense nuclear facility workers. Consistent with the mandate to DOE from Congress, this project implements a notification, health evaluation (including medical screening) and

  20. Composite construction for nuclear fuel containers

    DOE Patents [OSTI]

    Cheng, Bo-Ching; Rosenbaum, Herman S.; Armijo, Joseph S.

    1987-01-01

    An improved method for producing nuclear fuel containers of a composite construction having components providing therein a barrier system for resisting destructive action by volatile fission products or impurities and also interdiffusion of metal constituents, and the product thereof. The composite nuclear fuel containers of the method comprise a casing of zirconium or alloy thereof with a layer of copper overlying an oxidized surface portion of the zirconium or alloy thereof.

  1. Integrated Engineering, Construction, and Management Solutions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Integrated Engineering, Construction, and Management Solutions Washington Group International Contact: Susan Scott Public Affairs (505) 234-7204 http://www.wipp.ws Washington TRU Solutions LLC Washington TRU Solutions LLC Waste Isolation Pilot Plant Waste Isolation Pilot Plant P.O. Box 2078 P.O. Box 2078 Carlsbad, New Mexico 88221 Carlsbad, New Mexico 88221 For immediate release For immediate release Firm Awarded WIPP Records Demonstration Contract CARLSBAD, N.M., February 17, 2005 - Washington

  2. OMEGA EP Construction - Laboratory for Laser Energetics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction - Laboratory for Laser Energetics Laboratory for Laser Energetics Logo Search Home Around the Lab Past Issues Past Quick Shots About Office of the Director Map to LLE LLE Tours LLE Building Map Partnerships Careers Education Undergraduate Program Graduate Program High School Program Faculty Contacts Computational Astrophysics H-E-D Physics Inertial Confinement Fusion Laser-Plasma Interaction Radiative Hydrodynamics Plasma Astrophysics Organization Director's Office Laser Development

  3. Unique Lanthide-Free Motor Construction

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Unique Lanthanide-Free Motor Construction Josh Ley, Principal Investigator Jon Lutz, Presenter Alan Gilbert, Program Manager UQM Technologies, Inc. April 21, 2014 APE044 This presentation does not contain any proprietary, confidential, or otherwise restricted information Overview Timeline Project start date: 10/01/2011 Project end date: 10/31/2015 Percent complete: 60% Budget Total project funding - $2,667K DOE Share - $889K UQM Share Funding received in FY13: $765K Funding for FY14: $806K

  4. Constructing Hydraulic Barriers in Deep Geologic Formations

    SciTech Connect (OSTI)

    Carter, E.E.; Carter, P.E. [Technologies Co, Texas (United States); Cooper, D.C. [Ph.D. Idaho National Laboratory, Idaho Falls, ID (United States)

    2008-07-01

    Many construction methods have been developed to create hydraulic barriers to depths of 30 to 50 meters, but few have been proposed for depths on the order of 500 meters. For these deep hydraulic barriers, most methods are potentially feasible for soil but not for hard rock. In the course of researching methods of isolating large subterranean blocks of oil shale, the authors have developed a wax thermal permeation method for constructing hydraulic barriers in rock to depths of over 500 meters in competent or even fractured rock as well as soil. The technology is similar to freeze wall methods, but produces a permanent barrier; and is potentially applicable in both dry and water saturated formations. Like freeze wall barriers, the wax thermal permeation method utilizes a large number of vertical or horizontal boreholes around the perimeter to be contained. However, instead of cooling the boreholes, they are heated. After heating these boreholes, a specially formulated molten wax based grout is pumped into the boreholes where it seals fractures and also permeates radially outward to form a series of columns of wax-impregnated rock. Rows of overlapping columns can then form a durable hydraulic barrier. These barriers can also be angled above a geologic repository to help prevent influx of water due to atypical rainfall events. Applications of the technique to constructing containment structures around existing shallow waste burial sites and water shutoff for mining are also described. (authors)

  5. Contacts for Integrating Renewable Energy into Federal Construction Projects

    Broader source: Energy.gov [DOE]

    Contacts to learn more about integrating renewable energy technologies into Federal construction projects.

  6. Assurances - Non-Construction Programs | Department of Energy

    Energy Savers [EERE]

    Assurances - Non-Construction Programs Assurances - Non-Construction Programs SF 424B, Assurances - Non-Construction Programs PDF icon Assurances - Non-Construction Programs More Documents & Publications Certifications and Assurances for Use with SF-424 National Policy Assurances to be Incorporated as Award Terms Microsoft Word - National Policy AssurancesAwardTermsREVJuly2005.doc

  7. Design & Construct New Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Design & Construct New Buildings Design & Construct New Buildings Photo of NREL's Research Support Facility under construction, with two workers straddling I-beams. Establishing and implementing aggressive energy performance goals during the design and construction of new commercial buildings is important to achieving those goals over the lifetime of the building. Energy efficiency measures can be applied in various stages of the design and construction process, including scoping and

  8. Y-12 Construction maintains 'superb' safety performance | Y-12 National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Complex Construction maintains ... Y-12 Construction maintains 'superb' safety performance Posted: March 6, 2013 - 6:03pm Tom Morris, B&W Y-12 vice president of projects, presents Construction's safety awards to Monica Lewis, Y-12 craft safety lead representative, and Kevin Adkisson, Knoxville Building and Construction Trades Council president. At a recent celebration, B&W Y-12's Direct-Hire Construction team was honored for two major safety achievements: more than one

  9. Sustainability in Federal Building New Construction and Major Renovations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Sustainable Buildings & Campuses » Sustainability in Federal Building New Construction and Major Renovations Sustainability in Federal Building New Construction and Major Renovations Sustainability in Federal Building New Construction and Major Renovations The Guiding Principles require agencies to design, construct, and operate high-performance and sustainable buildings. New construction and major renovations to existing buildings offer agencies opportunities to

  10. SRNL RADIONUCLIDE FIELD LYSIMETER EXPERIMENT: BASELINE CONSTRUCTION AND IMPLEMENTATION

    SciTech Connect (OSTI)

    Roberts, K.; Kaplan, D.; Bagwell, L.; Powell, B.; Almond, P.; Emerson, H.; Hixon, A.; Jablonski, J.; Buchanan, C.; Waterhouse, T.

    2012-10-17

    The purpose of this document is to compile information regarding experimental design, facility design, construction, radionuclide source preparation, and path forward for the ten year Savannah River National Laboratory (SRNL) Radionuclide Field Lysimeter Experiment at the Savannah River Site (SRS). This is a collaborative effort by researchers at SRNL and Clemson University. The scientific objectives of this study are to: Study long-term radionuclide transport under conditions more representative of vadose zone conditions than laboratory experiments; Provide more realistic quantification of radionuclide transport and geochemistry in the vadose zone, providing better information pertinent to radioactive waste storage solutions than presently exists; Reduce uncertainty and improve justification for geochemical models such as those used in performance assessments and composite analyses.

  11. Geopolymer concretes: a green construction technology rising from the ash

    SciTech Connect (OSTI)

    Allouche, E.

    2009-07-01

    Researchers at Louisiana Tech University have embarked on a multi-year research initiative to develop applications for inorganic polymer concrete, or geopolymer concrete, in the area of civil construction, and to bring solve of these applications to market. One objective was to produce a spray-on coating for use in the harsh environment of wastewater conveyance and treatment facilities. Another project is to establish relationships between fly ash composition and particle size distribution and the mechanical attributes and workability of the resulting geopolymer concrete. A third project is to develop a 'smart' geopolymer concrete whose response to a given electric current can be correlated to the stress level to which the structure is subjected. 1 fig., 6 photos.

  12. Projects of the year

    SciTech Connect (OSTI)

    Hansen, T.

    2007-01-15

    The Peabody Hotel, Orlando, Florida was the site of Power Engineering magazine's 2006 Projects of the Year Awards Banquet, which kicked-off the Power-Gen International conference and exhibition. The Best Coal-fired Project was awarded to Tri-State Generation and Transmission Association Inc., owner of Springenville Unit 3. This is a 400 MW pulverized coal plant in Springeville, AZ, sited with two existing coal-fired units. Designed to fire Powder River Basin coal, it has low NOx burners and selective catalytic reduction for NOx control, dry flue gas desulfurization for SO{sub 2} control and a pulse jet baghouse for particulate control. It has a seven-stage feedwater heater and condensers to ensure maximum performance. Progress Energy-Carolinas' Asheville Power Station FGD and SCR Project was awarded the 2006 coal-fired Project Honorable Mention. This plant in Skyland, NC was required to significantly reduce NOx emissions. When completed, the improvements will reduce NOx by 93% compared to 1996 levels and SO{sub 2} by 93% compared to 2001 levels. Awards for best gas-fired, nuclear, and renewable/sustainable energy projects are recorded. The Sasyadko Coal-Mine Methane Cogeneration Plant near Donezk, Ukraine, was given the 2006 Honorable Mention for Best Renewable/Sustainable Energy Project. In November 2004, Ukraine was among 14 nations to launch the Methane to Markets partnership. The award-winning plant is fuelled by methane released during coal extraction. It generates 42 MW of power. 4 photos.

  13. Concurrent Transfers Historical Yearly Peak

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the graph for current year shows the data for the year-to-date peak. Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily...

  14. Overview of Commercial Buildings, 2003 - Major Characteristics

    U.S. Energy Information Administration (EIA) Indexed Site

    commercial floorspace. Figure 7. Floorspace in office, mercantile, warehousestorage, and education buildings accounts for 60 percent of total commercial floorspace. Source: Energy...

  15. Eighteenth annual T and D construction survey

    SciTech Connect (OSTI)

    Not Available

    1983-08-01

    This survey measures utilities' actual midyear expenditures against projections. The results are cause for mild optimism, although some locales still have problems. Companies represented comprise 77.1% of installed capacity in 48 states and 75.9% of customers: 137 investor-owned utilities, 47 municipals and public power districts, 35 corporations, and 9 state or federal utilities. New and comparative data cover (1) MVA of distribution transformers (46 kW and below), (2) distribution circuit breakers, (3) capacitors (MVAr), (4) distribution substation banks, (5) transmission substation banks, (6) miles of transmission, (7) approximate circuit capability (GW), (8) tranmission circuit breakers, and (9) major construction by regions. 8 figures, 9 tables.

  16. Looking northeast over the ITER construction site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Looking northeast over the ITER construction site. A power shovel removes the first of some 230,000 cubic meters from the Tokamak Pit. Operations and Safety on the ITER Platform are being carefully coordinated by the Engage Consortium and the French company APAVE. Bulldozers and scrapers are busy leveling the 14,000 square-meter area that will host the huge PF Coils Assembly Building. Welcome to the first U.S. ITER newsletter. We have prepared this publication as part of our effort to better

  17. Combined Construction and Operating License (COL)

    Office of Environmental Management (EM)

    2 Updates available at: http://www.nuclear.gov NEXT UPDATE - January 2013 Page 1 News Updates  On August 7, NRC issued an order halting issuance of any new construction licenses or license renewals until the Commission can respond to a June 8 court ruling striking down the NRC's waste confidence rule, which assumes that a waste repository will be available "when necessary"; reviews of license applications will continue and the order does not apply to design certifications.  On

  18. Jr., Process Development Branch Construction Division SUBJECT:

    Office of Legacy Management (LM)

    FR?M : Jr., Process Development Branch Construction Division SUBJECT: INING TESTS AT BOWEN ENGINEERING, INC. - M A Y 16 AND 16,!1961 SYMBOL! EPD:ABBrbt I REY~AKC~: &DiVE;G?i&)il [q a 1 $ a, " I On day 16 and 16,,1951 Bowen Engineering, Inc. made test rune on ypray calcining of boiled-down Mallinokrodt pitohblende raffinate. Theqe rune were made in Bowen'e laboratory unit et North Branch, NT Jel;sey. The initial results indicate that raffidate &$be euocessfully epray oalcined to

  19. Construction of an embankment with a fly and bottom ash mixture: field performance study

    SciTech Connect (OSTI)

    Yoon, S.; Balunaini, U.; Yildirim, I.Z.; Prezzi, M.; Siddiki, N.Z.

    2009-06-15

    Fly ash and bottom ash are coal combustion by-products (CCBPs) that are generated in large quantities throughout the world. It is often economical to dispose ash as mixtures rather than separately; that notwithstanding, only a few studies have been performed to investigate the behavior of fly and bottom ash mixtures, particularly those with high contents of fly ash. Also, there is very limited data available in the literature on the field performance of structures constructed using ash mixtures. This paper describes the construction and the instrumentation of a demonstration embankment built with an ash mixture (60:40 by weight of fly ash:bottom ash) on State Road 641, Terre Haute, Ind. Monitoring of the demonstration embankment was conducted for a period of 1 year from the start of construction of the embankment. The settlement of the embankment stabilized approximately 5 months after the end of its construction. According to horizontal inclinometer readings, the differential settlement at the top of the embankment is about 5 mm. Results from field quality control tests performed during construction of the demonstration embankment and monitoring data from vertical and horizontal inclinometers and settlement plates indicate that the ash mixture investigated can be considered an acceptable embankment construction material.

  20. The Federal manufactured home construction and safety standards -- implications for foam panel construction

    SciTech Connect (OSTI)

    Lee, A.D.; Schrock, D.W.; Flintoft, S.A.

    1997-03-01

    This report reviews the U.S. Department of Housing and Urban Development construction code for (HUD-code) manufactured homes, Part 3280: Manufactured Home Construction and Safety Standards (the HUD Code), to identify sections that might be relevant in determining if insulated foam core panels (or structural insulated panels, SIPs) meet the requirements of Part 3280 for use in manufactured home construction. The U.S. Department of Energy and other parties are interested in the use of SIPs in residential construction, including HUD-Code manufactured homes, because the foam panels can have a higher effective insulation value than standard stud-framed construction and use less dimensional lumber. Although SIPs have not been used in manufactured housing, they may be well suited to the factory production process used to manufacture HUD-Code homes and the fact that they require less virgin timber may reduce the effect of volatile and increasing timber prices. Part 3280 requirements for fire resistance, wind resistance, structural load strength, ventilation, transportation shock, and thermal protection are reviewed. A brief comparison is made between the HUD Code requirements and data collected from foam panel manufacturers. 8 refs.

  1. Technical WOrk Plan for: Construction Effects Monitoring

    SciTech Connect (OSTI)

    S. Goodin

    2006-09-14

    This document is the technical work plan (TWP) for performing the Construction Effects Monitoring (CEM) activity, which is one of 20 testing and monitoring activities included in Performance Confirmation Plan (BSC 2004 [DIRS 172452]). Collectively, the 20 activities make up the Performance Confirmation Program described in the plan. Each of the other 19 activities will have a separate TWP. This plan, though titled Construction Effects Monitoring, in accordance with the Performance Confirmation Plan, also includes testing that may be performed in addition to monitoring, if required. Performance confirmation is required by regulation 10 CFR Part 63 [DIRS 173273], and was started during site characterization (consistent with the regulation) and will continue until permanent closure of the repository (10 CFR 63.13 1 (b) [DIRS 173273]). This CEM activity has two primary goals: (1) to collect, analyze, and report on repository rock properties data for the purpose of confirming geotechnical and design parameters used in repository design, and (2) to provide information intended to confirm that the ability to retrieve waste from the repository has been preserved. It will be necessary for information from this CEM activity to be evaluated in combination with that obtained from other Performance Confirmation Program activities to achieve these goals. These relationships with other Performance Confirmation Program activities (e.g., drift inspection, subsurface mapping, and seismicity monitoring) will be discussed in later sections of this TWP.

  2. NJ Clean Energy- Residential New Construction Program

    Broader source: Energy.gov [DOE]

    NOTE: The program offerings have been significantly changed for the fiscal year 2016. The changes go into effect starting September 1st, 2015.  More information about changes can be accessed in the...

  3. Wave power prototype nears construction phase

    SciTech Connect (OSTI)

    Baggott, M.; Morris, R.

    1985-02-01

    A Scottish-led consortium of major United Kingdom (UK) and European companies will soon decide on the next stage in the development of a prototype 5-MW wave energy system. The oscillating water column, wave energy Breakwater system was developed in Scotland by the National Engineering Laboratory (NEL) over the past 10 years. Plans for the prototype follow a year-long economic and feasibility study that indicated a worldwide market potential of $1 billion over the next decade for the system.

  4. Aggregate Transfers Historical Yearly Peak

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transfers Historical Yearly Peak Aggregate Transfers Historical Yearly Peak These plots show the yearly peak days from 2000 to the present. BE CAREFUL because the graphs are autoscaling - check the scales on each axis before you compare graphs. Note that the graph for current year shows the data for the year-to-date peak. Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate

  5. Concurrent Transfers Historical Yearly Peak

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transfers Historical Yearly Peak Concurrent Transfers Historical Yearly Peak These plots show the yearly peak days from 2000 to present. BE CAREFUL because the graphs are autoscaling - check the scales on each axis before you compare graphs. Note that the graph for current year shows the data for the year-to-date peak. Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage

  6. YEAR 2 BIOMASS UTILIZATION

    SciTech Connect (OSTI)

    Christopher J. Zygarlicke

    2004-11-01

    This Energy & Environmental Research Center (EERC) Year 2 Biomass Utilization Final Technical Report summarizes multiple projects in biopower or bioenergy, transportation biofuels, and bioproducts. A prototype of a novel advanced power system, termed the high-temperature air furnace (HITAF), was tested for performance while converting biomass and coal blends to energy. Three biomass fuels--wood residue or hog fuel, corn stover, and switchgrass--and Wyoming subbituminous coal were acquired for combustion tests in the 3-million-Btu/hr system. Blend levels were 20% biomass--80% coal on a heat basis. Hog fuel was prepared for the upcoming combustion test by air-drying and processing through a hammer mill and screen. A K-Tron biomass feeder capable of operating in both gravimetric and volumetric modes was selected as the HITAF feed system. Two oxide dispersion-strengthened (ODS) alloys that would be used in the HITAF high-temperature heat exchanger were tested for slag corrosion rates. An alumina layer formed on one particular alloy, which was more corrosion-resistant than a chromia layer that formed on the other alloy. Research activities were completed in the development of an atmospheric pressure, fluidized-bed pyrolysis-type system called the controlled spontaneous reactor (CSR), which is used to process and condition biomass. Tree trimmings were physically and chemically altered by the CSR process, resulting in a fuel that was very suitable for feeding into a coal combustion or gasification system with little or no feed system modifications required. Experimental procedures were successful for producing hydrogen from biomass using the bacteria Thermotoga, a deep-ocean thermal vent organism. Analytical procedures for hydrogen were evaluated, a gas chromatography (GC) method was derived for measuring hydrogen yields, and adaptation culturing and protocols for mutagenesis were initiated to better develop strains that can use biomass cellulose. Fly ash derived from cofiring coal with waste paper, sunflower hulls, and wood waste showed a broad spectrum of chemical and physical characteristics, according to American Society for Testing and Materials (ASTM) C618 procedures. Higher-than-normal levels of magnesium, sodium, and potassium oxide were observed for the biomass-coal fly ash, which may impact utilization in cement replacement in concrete under ASTM requirements. Other niche markets for biomass-derived fly ash were explored. Research was conducted to develop/optimize a catalytic partial oxidation-based concept for a simple, low-cost fuel processor (reformer). Work progressed to evaluate the effects of temperature and denaturant on ethanol catalytic partial oxidation. A catalyst was isolated that had a yield of 24 mole percent, with catalyst coking limited to less than 15% over a period of 2 hours. In biodiesel research, conversion of vegetable oils to biodiesel using an alternative alkaline catalyst was demonstrated without the need for subsequent water washing. In work related to biorefinery technologies, a continuous-flow reactor was used to react ethanol with lactic acid prepared from an ammonium lactate concentrate produced in fermentations conducted at the EERC. Good yields of ester were obtained even though the concentration of lactic acid in the feed was low with respect to the amount of water present. Esterification gave lower yields of ester, owing to the lowered lactic acid content of the feed. All lactic acid fermentation from amylose hydrolysate test trials was completed. Management activities included a decision to extend several projects to December 31, 2003, because of delays in receiving biomass feedstocks for testing and acquisition of commercial matching funds. In strategic studies, methods for producing acetate esters for high-value fibers, fuel additives, solvents, and chemical intermediates were discussed with several commercial entities. Commercial industries have an interest in efficient biomass gasification designs but are waiting for economic incentives. Utility, biorefinery, pulp and paper, or other industries are interested in lignin as a potential fuel or feedstock but need more information on properties.

  7. 60 Years of Computing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    60 Years of Computing 60 Years of Computing

  8. Construction Underway on First Geothermal Power Plant in New...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Construction Underway on First Geothermal Power Plant in New Mexico Construction Underway on First Geothermal Power Plant in New Mexico September 10, 2008 - 4:38pm Addthis Photo of ...

  9. Indoor airPLUS Construction Specifications | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Specifications Indoor airPLUS Construction Specifications Indoor airPLUS Construction Specifications Version 1 (Rev. 01) EPA 402K-13001, February 2013 PDF icon iaprev1.pdf More...

  10. CDPHE Construction Storm Water Forms | Open Energy Information

    Open Energy Info (EERE)

    Construction Storm Water Forms Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: CDPHE Construction Storm Water FormsLegal Abstract The...

  11. Construction General Permit Fact Sheet | Open Energy Information

    Open Energy Info (EERE)

    Construction General Permit Fact Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Construction General Permit Fact SheetLegal...

  12. Environment/Health/Safety: Sub-Contractor Construction Resource...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EH&S Sub-Contractor Construction Resource Page 2015 Home EHS0470-GERT JHA Templates Tool Box Safety Topics Pub-3000 Ch. 10 - Construction Safety Manual Administrative Policies...

  13. Construction, Qualification, and Low Rate Production Start-up...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Construction, Qualification, and Low Rate Production Start-up of a DC Bus Capacitor High ... Construction, Qualification, and Low Rate Production Start-up of a DC Bus Capacitor High ...

  14. Some of the buildings constructed at Y-12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the buildings constructed at Y-12 In researching the history of Y-12, I have found the following information on buildings constructed as a part of the Manhattan Project. There...

  15. McGraw Hill Construction | Open Energy Information

    Open Energy Info (EERE)

    McGraw Hill Construction Jump to: navigation, search Name: McGraw Hill Construction Place: New York, NY Website: www.mcgrawhillconstruction.com References: McGraw Hill...

  16. Sustainability in Federal Building New Construction or Modernization

    Broader source: Energy.gov [DOE]

    The Guiding Principles require agencies to design, construct, and operate sustainable buildings. New construction or modernization offers agencies opportunities to incorporate energy-efficient designs, sustainable siting and materials, and renewable energy technologies into federal facilities.

  17. File:08CADPermitToConstruct.pdf | Open Energy Information

    Open Energy Info (EERE)

    CADPermitToConstruct.pdf Jump to: navigation, search File File history File usage Metadata File:08CADPermitToConstruct.pdf Size of this preview: 463 599 pixels. Other...

  18. Construction of energy-stable projection-based reduced order...

    Office of Scientific and Technical Information (OSTI)

    Construction of energy-stable projection-based reduced order models Prev Next Title: Construction of energy-stable projection-based reduced order models Our paper aims to ...

  19. Coal cars - the first three hundred years

    SciTech Connect (OSTI)

    Martin Robert Karig III

    2007-12-15

    This is the comprehensive study of the freight cars that conveyed coal across broad swaths of land that had been impassible before the invention of the steam engine. This volume traces the history and evolution of coal cars from their earliest use in England to the construction of major railways for the purpose of coal hauling and the end of the steam era on American railroads. In addition to contextualizing coal cars in the annals of industrial history, the book features extensive design specifications and drawings as well as a complete history of the various safety and mechanical innovations employed on these freight cars. It concludes with a photographic essay illustrating the development of the coal car over its first 300 years of use. 608 photos.

  20. Reminiscing about 15 years of interoperability efforts

    SciTech Connect (OSTI)

    Van de Sompel, Herbert; Nelson, Michael L.

    2015-11-01

    Over the past fifteen years, our perspective on tackling information interoperability problems for web-based scholarship has evolved significantly. In this opinion piece, we look back at three efforts that we have been involved in that aptly illustrate this evolution: OAI-PMH, OAI-ORE, and Memento. Understanding that no interoperability specification is neutral, we attempt to characterize the perspectives and technical toolkits that provided the basis for these endeavors. With that regard, we consider repository-centric and web-centric interoperability perspectives, and the use of a Linked Data or a REST/HATEAOS technology stack, respectively. In addition, we lament the lack of interoperability across nodes that play a role in web-based scholarship, but end on a constructive note with some ideas regarding a possible path forward.

  1. Reminiscing about 15 years of interoperability efforts

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Van de Sompel, Herbert; Nelson, Michael L.

    2015-11-01

    Over the past fifteen years, our perspective on tackling information interoperability problems for web-based scholarship has evolved significantly. In this opinion piece, we look back at three efforts that we have been involved in that aptly illustrate this evolution: OAI-PMH, OAI-ORE, and Memento. Understanding that no interoperability specification is neutral, we attempt to characterize the perspectives and technical toolkits that provided the basis for these endeavors. With that regard, we consider repository-centric and web-centric interoperability perspectives, and the use of a Linked Data or a REST/HATEAOS technology stack, respectively. In addition, we lament the lack of interoperability across nodes thatmore » play a role in web-based scholarship, but end on a constructive note with some ideas regarding a possible path forward.« less

  2. Imagine Homes New Construction Occupied Test House

    SciTech Connect (OSTI)

    Stecher, Dave; Rapport, Ari; Allison, Katherine

    2013-07-01

    This report summarizes the research findings of a long-term monitoring plan to evaluate the performance of an energy-efficient home constructed in 2010 in San Antonio, Texas. Monitoring of the energy use, energy generation, and temperature conditions for this project occurred between July 2010 and October 2011. The home achieves a source energy savings of 32% without the installed photovoltaic (PV) system and 44% savings with the PV system contribution relative to the Building America House Simulation Protocols. This report summarizes the research findings related to heating, ventilation, and air conditioning system performance, estimated and actual energy use of key subsystems, electricity generation by the PV system, and performance of the solar thermal domestic hot water system.

  3. Instrumentation of dredge spoil for landfill construction

    SciTech Connect (OSTI)

    Byle, M.J.; McCullough, M.L.; Alexander, R.; Vasuki, N.C.; Langer, J.A.

    1999-07-01

    The Delaware Solid Waste Authority's Northern Solid Waste Management Center is located outside of Wilmington Delaware at Cherry Island, a former dredge disposal site. Dredge spoils, of very low permeability, range in depths up to 30 m (100 feet) which form a natural liner and the foundation for the 140 ha (350-acre) municipal solid waste landfill. The soils beneath the landfill have been extensively instrumented to measure pore pressure, settlement and deflections, using inclinometer casings, standpipe piezometers, vibrating wire piezometers, pneumatic piezometers, settlement plates, liquid settlement gages, total pressure cells and thermistors. The nature of the existing waste and anticipated settlements (up to 6 m (19 feet)) have required some unique installation details. The instrumentation data has been integral in planning the landfilling sequence to maintain perimeter slope stability and has provided key geotechnical parameters needed for operation and construction of the landfill. The performance of the instrumentation and monitoring results are discussed.

  4. Chapter 15: Commercial New Construction Protocol

    SciTech Connect (OSTI)

    Keates, S.

    2014-09-01

    This protocol is intended to describe the recommended method when evaluating the whole-building performance of new construction projects in the commercial sector. The protocol focuses on energy conservation measures (ECMs) measures (or packages of measures) where evaluators can best analyze impacts using building simulation. These ECMs typically require the use of calibrated building simulations under Option D of the International Performance Measurement and Verification Protocol. Examples of such measures include Leadership in Energy and Environmental Design building certification, novel and/or efficient heating, ventilation, and air conditioning system designs, and extensive building controls systems. In general, it is best to evaluate any ECM (or set of measures) expected to significantly interact with other systems within the building and with savings sensitive to seasonal variations in weather.

  5. Caspian pipeline combine awards construction contract

    SciTech Connect (OSTI)

    Not Available

    1992-11-02

    This paper reports that the Caspian Pipeline Consortium (CPC) has let contract to Overseas Bechtel Inc. for a 500 mile crude oil export pipeline in Russia. Bechtel will provide engineering, procurement, financing, and construction services and serve as project manager for the 42 inc. line that will extend west from Grozny, near the Caspian Sea, to Novorossiisk, on the Black Sea. Estimated cost is more than $850 million. At Grozny, the new line will tie into 800 miles of existing pipeline that runs along the north shore of the Caspian Sea from supergiant Tengiz field in Kazakhstan. Together, the two segments will form a 1,300 mile system capable of shipping crude oil from the Tengiz region and from Baku, Azerbaijan, to a new terminal and port facilities at Novorossiisk for shipment to world markets, ultimately reaching open oceans via the Mediterranean Sea.

  6. Fermilab | Illinois Accelerator Research Center | Construction Progress

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction Progress 08/14/2013 photo photo 04/15/2013 photo 04/01/2013 photo 03/26/2013 photo 03/19/2013 photo 03/11/2013 photo 03/04/2013 photo 02/25/2013 photo 02/18/2013 photo 02/11/2013 photo 02/06/2013 photo 01/07/2013 photo 01/02/2013 photo 12/03/2012 photo 11/19/2012 photo 11/06/2012 photo 10/29/2012 photo 10/22/2012 photo 10/15/2012 photo 10/08/2012 photo 09/21/2012 photo 08/29/2012 photo 08/28/2012 photo 07/13/2012 photo 06/29/2012 photo

  7. Guidance on New Construction under an Energy Savings Performance Contract

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance on New Construction under an Energy Savings Performance Contract November 2013 This document provides guidance on the limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. 2 Guidance on "New" Construction under an Energy Savings Performance Contract Subject: Limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. Summary: In general, an ESPC

  8. Federal ESPC Process Phase 4: Project Implementation and Construction |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4: Project Implementation and Construction Federal ESPC Process Phase 4: Project Implementation and Construction Phase 4 of the energy savings performance contract (ESPC) process focuses on project implementation and construction. At this point, an ESPC project is much like any other construction project. In fact, the U.S. Department of Energy's (DOE) indefinite-delivery, indefinite-quantity (IDIQ) ESPC contains the Federal Acquisition Regulations clauses that normally

  9. Construction Begins on New Waste Processing Facility | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Construction Begins on New Waste Processing Facility Construction Begins on New Waste Processing Facility February 9, 2012 - 12:00pm Addthis Workers construct a new facility that will help Los Alamos National Laboratory accelerate the shipment of transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) in Carlsbad for permanent disposal. Workers construct a new facility that will help Los Alamos National Laboratory accelerate the shipment of transuranic (TRU) waste to the Waste

  10. Construction Project Safety and Health Plan RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Safety and Health Plan RM Construction Project Safety and Health Plan RM The Construction Project Safety and Health Plan (CPSHP) Review Module is a tool that assists DOE federal project review teams in evaluating the technical sufficiency of the project readiness in ensuring worker safety during construction after Critical Decision-3 approval. PDF icon Construction Project Safety and Health Plan RM More Documents & Publications Facility Disposition Safety Strategy RM Standard Review

  11. Air Sealing for New Home Construction | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    » Air Sealing for New Home Construction Air Sealing for New Home Construction Air Sealing for New Home Construction Minimizing air movement in and out of a house is key to building an energy-efficient home. Controlling air leakage is also critical to moisture control. It's always best to use techniques and materials identified as best practices for your site and climate. Climate-specific construction details are available through Building America. Here are some general air sealing techniques

  12. Enterprise Assessments Review, Hanford K-West Annex Facility Construction

    Office of Environmental Management (EM)

    Quality - January 2015 | Department of Energy Review, Hanford K-West Annex Facility Construction Quality - January 2015 Enterprise Assessments Review, Hanford K-West Annex Facility Construction Quality - January 2015 January, 2015 Review of the Hanford Site K-West Annex Facility Construction Quality The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) conducted an independent assessment of construction quality at the Hanford Site K-West Annex Facility. The

  13. FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) | Department of Energy

    Office of Environmental Management (EM)

    FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) Form provides information on the federal assistance budget for construction projects, including calculation of the federal award needed to meet requirements, exclusions, and the proposed method for calculating the non-federal share. PDF icon FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) More Documents & Publications DOE F 4600.4 DOE F 4600.5 DOE F 4600.3

  14. Enforcement Letter, Construction Consultants L.I., Inc. | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Construction Consultants L.I., Inc. Enforcement Letter, Construction Consultants L.I., Inc. December 4, 2015 Worker Safety and Health Enforcement Letter issued to Construction Consultants L.I., Inc. On December 4, 2015, the U.S. Department of Energy (DOE) Office of Enterprise Assessments' Office of Enforcement issued an Enforcement Letter (WEL-2015-05) to Construction Consultants L.I., Inc., relating to an electrical shock suffered by a subcontractor while working on a meteorological

  15. Thick Concrete Specimen Construction, Testing, and Preliminary Analysis

    SciTech Connect (OSTI)

    Clayton, Dwight A.; Hoegh, Kyle; Khazanovich, Lev

    2015-03-01

    The purpose of the U.S. Department of Energy Office of Nuclear Energys Light Water Reactor Sustainability (LWRS) Program is to develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the operating lifetimes of nuclear power plants (NPPs) beyond 60 years. Since many important safety structures in an NPP are constructed of concrete, inspection techniques must be developed and tested to evaluate the internal condition. In-service containment structures generally do not allow for the destructive measures necessary to validate the accuracy of these inspection techniques. This creates a need for comparative testing of the various nondestructive evaluation (NDE) measurement techniques on concrete specimens with known material properties, voids, internal microstructure flaws, and reinforcement locations. A preliminary report detailed some of the challenges associated with thick reinforced concrete sections and prioritized conceptual designs of specimens that could be fabricated to represent NPP concrete structures for using in NDE evaluation comparisons. This led to the construction of the concrete specimen presented in this report, which has sufficient reinforcement density and cross-sectional size to represent an NPP containment wall. Details on how a suitably thick concrete specimen was constructed are presented, including the construction materials, final nominal design schematic, as well as formwork and rigging required to safely meet the desired dimensions of the concrete structure. The report also details the type and methods of forming the concrete specimen as well as information on how the rebar and simulated defects were embedded. Details on how the resulting specimen was transported, safely anchored, and marked to allow access for systematic comparative NDE testing of defects in a representative NPP containment wall concrete specimen are also given. Data collection using the MIRA Ultrasonic NDE equipment and initial results are also presented along with a discussion of the preliminary findings. Comparative NDE of various defects in reinforced concrete specimens is a key component in identifying the most promising techniques and directing the research and development efforts needed to characterize concrete degradation in commercial NPPs. This requires access to the specimens for data collection using state-of-the-art technology. The construction of the specimen detailed in this report allows for an evaluation of how different NDE techniques may interact with the size and complexities of NPP concrete structures. These factors were taken into account when determining specimen size and features to ensure a realistic design. The lateral dimensions of the specimen were also chosen to mitigate unrealistic boundary effects that would not affect the results of field NPP concrete testing. Preliminary results show that, while the current methods are able to identify some of the deeper defects, improvements in data processing or hardware are necessary to be able to achieve the precision and reliability achieved in evaluating thinner and less heavily reinforced concrete structures.

  16. Construction safety program for the National Ignition Facility

    SciTech Connect (OSTI)

    Cerruti, S.J.

    1997-06-26

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF.

  17. Transfer Activity Historical Yearly Peak

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Activity Historical Yearly Peak Transfer Activity Historical Yearly Peak The plots below show the yearly peak days from 2000 to the present. BE CAREFUL because the graphs are autoscaling - check the scales on each axis before you compare graphs. Note that the graph for the current year shows the data for the year-to-date peak. Transfers Started/In Progress Transfers Started/In Progress Transfers Started/In Progress Transfers Started/In Progress Transfers Started/In Progress Transfers Started/In

  18. 2013 Director's New Year Address

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2013 Director's New Year Address 2013 Director's New Year Address Print Looking Forward and Celebrating 20 Years in 2013 falocne We recently sat down with ALS Director Roger Falcone to talk about what 2013 has in store for the ALS. An immediate answer is - a celebration - as the ALS marks its 20th year of operation. We'll spend some time this year looking back at what we've accomplished over the past couple of decades and forward to how we'll continue to contribute to the future of scientific

  19. YEAR

    National Nuclear Security Administration (NNSA)

    2012 2013 SES 2 1 -50.00% EJEK 10 9 -10.00% EN 04 27 24 -11.11% NN (Engineering) 28 24 -14.29% NQ (ProfTechAdmin) 31 29 -6.45% NU (TechAdmin Support) 4...

  20. YEAR

    National Nuclear Security Administration (NNSA)

    SES 1 2 100.00% EJEK 2 2 0.00% EN 04 1 1 0.00% EN 03 1 0 -100.00% NN (Engineering) 12 11 -8.33% NQ (ProfTechAdmin) 216 218 0.93% NU (TechAdmin Support) 2...

  1. YEAR

    National Nuclear Security Administration (NNSA)

    2013 SES 2 2 0.00% EJEK 7 8 14.29% EN 04 11 11 0.00% EN 03 1 1 0.00% NN (Engineering) 23 24 4.35% NQ (ProfTechAdmin) 35 32 -8.57% NU (TechAdmin Support) 3 2...

  2. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 24 White Female (W ...

  3. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 13 White Female (W ...

  4. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 21 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 5 Hispanic Female (H F) 3 White Male (W M) 26 White Female (W ...

  5. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 46 White Female (W ...

  6. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 4 Asian American Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 68 White Female (W ...

  7. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 3 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 13 Hispanic Female (H F) 10 White Male (W M) 43 White Female ...

  8. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 12 Hispanic Female (H F) 12 White Male (W M) 34 White Female ...

  9. Year

    U.S. Energy Information Administration (EIA) Indexed Site

    Note: Total may not equal sum of components because of independent rounding. Source: U.S. Department of Labor, Mine Safety and Health Administration, Form 7000-2, 'Quarterly Mine ...

  10. YEAR

    National Nuclear Security Administration (NNSA)

    1.6% 6.6% 0.7% 17.5% 49.7% 2.7% 13.4% 0.1% 0.1% 0.1% Pay Plan Males 66.5% Females 33.5% Gender AIAN M AIAN F AA M AA F AAPI M AAPI F H M H F W M W F 1.1% 1.0% 3.7% 5.8% 2.6% 1.0%...

  11. Construction of artificial pigment-protein antennae

    SciTech Connect (OSTI)

    Sibbald, J.

    1997-01-10

    Photosynthesis is a complex process which results in the conversion of solar radiation into chemical energy. This chemical energy is then used as the free energy source for all living organisms. In its basic form, photosynthesis can be described as the light-activated synthesis of carbohydrates from the simple molecules of water and carbon dioxide: 6H{sub 2}O + 6 CO{sub 2} light C{sub 6}H{sub 12}O{sub 6} + 6 O{sub 2} This basic mechanism actually requires numerous reaction steps. The two primary steps being: the capture of light by pigment molecules in light-harvesting antenna complexes and the transfer of this captured energy to the so-called photochemical reaction center. While the preferred pathway for energy absorbed by the chromophores in the antenna complexes is transfer to the reaction center, energy can be lost to competing processes such as internal conversion or radiative decay. Therefore, the energy transfer must be rapid, typically on the order of picoseconds, to successfully compete. The focus of the present work is on the construction of light-harvesting antenna complexes incorporating modular pigment-proteins.

  12. Flexible Language Constructs for Large Parallel Programs

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Rosing, Matt; Schnabel, Robert

    1994-01-01

    The goal of the research described in this article is to develop flexible language constructs for writing large data parallel numerical programs for distributed memory (multiple instruction multiple data [MIMD]) multiprocessors. Previously, several models have been developed to support synchronization and communication. Models for global synchronization include single instruction multiple data (SIMD), single program multiple data (SPMD), and sequential programs annotated with data distribution statements. The two primary models for communication include implicit communication based on shared memory and explicit communication based on messages. None of these models by themselves seem sufficient to permit the natural and efficient expression ofmore » the variety of algorithms that occur in large scientific computations. In this article, we give an overview of a new language that combines many of these programming models in a clean manner. This is done in a modular fashion such that different models can be combined to support large programs. Within a module, the selection of a model depends on the algorithm and its efficiency requirements. In this article, we give an overview of the language and discuss some of the critical implementation details.« less

  13. Method of constructing a superconducting magnet

    DOE Patents [OSTI]

    Satti, John A. (Naperville, IL)

    1981-01-01

    A superconducting magnet designed to produce magnetic flux densities of the order of 4 to 5 Webers per square meter is constructed by first forming a cable of a plurality of matrixed superconductor wires with each wire of the plurality insulated from each other one. The cable is shaped into a rectangular cross-section and is wound with tape in an open spiral to create cooling channels. Coils are wound in a calculated pattern in saddle shapes to produce desired fields, such as dipoles, quadrupoles, and the like. Wedges are inserted between adjacent cables as needed to maintain substantially radial placement of the long dimensions of cross sections of the cables. After winding, individual strands in each of the cables are brought out to terminals and are interconnected to place all of the strands in series and to maximize the propagation of a quench by alternating conduction from an inner layer to an outer layer and from top half to bottom half as often as possible. Individual layers are separated from others by spiraled aluminum spacers to facilitate cooling. The wound coil is wrapped with an epoxy tape that is cured by heat and then machined to an interference fit with an outer aluminum pipe which is then affixed securely to the assembled coil by heating it to make a shrink fit. In an alternate embodiment, one wire of the cable is made of copper or the like to be heated externally to propagate a quench.

  14. Twenty Years of Underground Research at Canada's URL

    SciTech Connect (OSTI)

    Chandler, N. A.

    2003-02-27

    Construction of Atomic Energy of Canada Limited's (AECL's) Underground Research Laboratory (URL) began in 1982. The URL was designed to address the needs of the Canadian nuclear fuel waste management program. Over the years, a comprehensive program of geologic characterization and underground hydrogeologic, geotechnical and geomechanical projects have been performed, many of which are ongoing. The scientific work at the URL has evolved through a number of different phases to meet the changing needs of Canada's waste management program. The various phases of the URL have included siting, site evaluation, construction and operation. Collaboration with international organizations is encouraged at the URL, with the facility being a centre of excellence in an International Atomic Energy Agency (IAEA) network of underground facilities. One of AECL's major achievements of the past 20 year program has been the preparation and public defense of a ten-volume Environmental Impact Statement (EIS) for a conceptual deep geologic repository. Completion of this dissertation on the characterization, construction and performance modeling of a conceptual repository in the granite rock of the Canadian Shield was largely based on work conducted at the URL. Work conducted over the seven years since public defense of the EIS has been directed towards developing those engineering and performance assessment tools that would be required for implementation of a deep geologic repository. The URL continues to be a very active facility with ongoing experiments and demonstrations performed for a variety of Canadian and international radioactive waste management organizations.

  15. Fifteen Years of Beam on Target | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fifteen Years of Beam on Target First beam enters Hall C First beam enters Hall C. On July 1, 1994, Jefferson Lab's accelerator delivered an electron beam into one of its experimental halls for the first time. It was just 10 years after the lab's founding and the construction of its first-of-a-kind accelerator. Great Expectations Initial plans called for a machine that could "accelerate" a more-or-less continuous beam of electrons by stuffing each electron with up to four billion

  16. Year's End 2012 | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Year's End 2012 September 27, 2012 Throughout history, civilizations have developed their own calendars and commemorated the start of a New Year. Modern civilizations often have two calendars, the second being the financial calendar. In the United Kingdom and Japan the financial year starts on April 1. In the United States, the relevant date for the federal government is Oct. 1 - Monday, next week. Working in a national laboratory, our links to the national budget cycle are especially strong;

  17. PADUCAH 2015 YEAR IN REVIEW

    Energy Savers [EERE]

    PADUCAH 2015 YEAR IN REVIEW "2015 has been a pivotal year at the Paducah Site. Now that we have successfully transitioned the gaseous diffusion plant from NRC oversight to DOE oversight and DOE has the entire site back for the first time in almost 20 years, major deactivation activities are under way to prepare the site for future decontamination and decommissioning. We are fortunate to have a highly skilled federal and contractor workforce in place to safely and successfully continue this

  18. Construction Cost Growth for New Department of Energy Nuclear Facilities

    SciTech Connect (OSTI)

    Kubic, Jr., William L.

    2014-05-25

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facility (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.

  19. NETL: The First 100 Years

    SciTech Connect (OSTI)

    2015-07-21

    The National Energy Technology Laboratory celebrates 100 years of innovative energy technology development. NETL has been a leader in energy technology development. This video takes a look back at the many accomplishments over the past 100 years. These advances benefit the American people, enhance our nation's energy security and protect our natural resources.

  20. Guidance on New Construction under an Energy Savings Performance Contract |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy on New Construction under an Energy Savings Performance Contract Guidance on New Construction under an Energy Savings Performance Contract Document covers the guidance of new construction under an energy savings performance contract. PDF icon espc_newconguidance.pdf More Documents & Publications Practical Guide to Savings and Payments in FEMP ESPC Task Orders DOE Guidance on the Statutory Definition of Energy/Water Conservation Measures (ECMs), and Determining

  1. Double-Shell Tank Construction: Extent of Condition

    SciTech Connect (OSTI)

    Venetz, Theodore J.; Gunter, Jason R.

    2014-05-13

    This presentation covers: quick recap of Hanford DSTs and the contribution of construction difficulties which led to the leak in tank AY-102; approach to Extent of Condition reviews; typical DST construction sequence; presentation of construction information resulting from extent of condition reviews of other DST farms with comparison to tank AY-102; and overall conclusion and impact of issues on the other DST tank farms.

  2. Recovery Act Supports Construction of Site's Largest Groundwater Treatment

    Office of Environmental Management (EM)

    Facility | Department of Energy Supports Construction of Site's Largest Groundwater Treatment Facility Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility Construction of the largest groundwater treatment facility at the Hanford Site – a major American Recovery and Reinvestment Act project – is on schedule and more than 70 percent complete. Recovery Act workers with DOE contractor CH2M HILL Plateau Remediation Company are on pace to finish

  3. Guide to Integrating Renewable Energy in Federal Construction

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrating Renewable Energy in Federal Construction Developed by the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), the "Guide to Integrating Renewable Energy into Federal Construction" helps Federal agencies understand renewable energy options, select appropriate types of renewable energy technologies, and integrate these technologies into all phases of new construction or major renovation projects. This PDF is a printed version of the online guide. This

  4. Federal Agencies Collaborate to Expedite Construction of Alaska Natural Gas

    Energy Savers [EERE]

    Pipeline | Department of Energy Collaborate to Expedite Construction of Alaska Natural Gas Pipeline Federal Agencies Collaborate to Expedite Construction of Alaska Natural Gas Pipeline June 29, 2006 - 2:44pm Addthis Agreement Establishes Framework for Increasing Energy Security WASHINGTON, DC - The U.S. Department of Energy and 14 other federal departments and agencies have signed an agreement to expedite the permitting and construction of the Alaska Natural Gas Pipeline which, when

  5. New Construction - Commercial Reference Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercial Buildings » New Construction - Commercial Reference Buildings New Construction - Commercial Reference Buildings The files on this page contain commercial reference building models for new construction, organized by building type and location. These U.S. Department of Energy (DOE) reference buildings are complete descriptions for whole building energy analysis. You can also return to a summary of building types and climate zones and information about other building vintages. These

  6. Community Meeting to Focus on NREL Construction Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community Meeting to Focus on NREL Construction Plans For more information contact: Kerry Masson (303) 275-4083 Golden, Colo., May 6, 1996 -- The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) will host a community meeting May 15 at 6:30 p.m. at the NREL Visitors Center, 15013 Denver West Parkway. Frank Stewart, DOE's Golden Field Officer Manager, will discuss a variety of issues including planned construction projects on NREL's 300-acre campus. Construction plans

  7. Los Alamos National Laboratory cosponsors April 13 construction forum in

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Albuquerque LANL cosponsors construction forum Los Alamos National Laboratory cosponsors April 13 construction forum in Albuquerque Companies big and small can learn about upcoming construction projects and procurement opportunities. April 7, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and

  8. World`s developing regions provide spark for pipeline construction

    SciTech Connect (OSTI)

    Koen, A.D.; True, W.R.

    1996-02-05

    This paper reviews the proposed construction of oil and gas pipelines which are underway or proposed to be started in 1996. It breaks down the projects by region of the world, type of product to be carried, and diameter of pipeline. It also provides mileage for each category of pipeline. Major projects in each region are more thoroughly discussed giving details on construction expenditures, construction problems, and political issues.

  9. Construction Underway on First Geothermal Power Plant in New Mexico |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Construction Underway on First Geothermal Power Plant in New Mexico Construction Underway on First Geothermal Power Plant in New Mexico September 10, 2008 - 4:38pm Addthis Photo of a geothermal power plant. New Mexico Governor Bill Richardson and Raser Technologies, Inc. announced in late August that construction has begun on the first commercial geothermal power plant in New Mexico. Located near Animas in the southwest corner of the state, the 10-megawatt (MW) Lightning

  10. CONSTRUCTION CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CONSTRUCTION CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen Telephone (510) 486-4506 Email dtchen@lbl.gov All Other Specialty Trade Contractors 238990 LAWRENCE LIVERMORE LAB POC Jill Swanson Telephone (925) 423-4535 Email swanson6@llnl.gov All Other Specialty Trade Contractors 238990 COLORADO GOLDEN FIELD OFFICE POC Karen Downs Telephone (720) 356-1269 Email karen.downs@go.doe.gov Industrial Building Construction 236210 Commercial and Institutional Building Construction 236220 Power and

  11. Sample Contract Language for Construction Using Energy-Efficient Products |

    Energy Savers [EERE]

    Department of Energy Sample Contract Language for Construction Using Energy-Efficient Products Sample Contract Language for Construction Using Energy-Efficient Products Document covers sample language that federal agencies can use in contracts specifying or purchasing energy-efficient products in construction projects. This includes the following products qualified by ENERGY STAR or designated by the Federal Energy Management Program: Air conditioners Ballasts Boilers Chillers Doors Electric

  12. Large-Scale Industrial Carbon Capture, Storage Plant Begins Construction |

    Office of Environmental Management (EM)

    Department of Energy Large-Scale Industrial Carbon Capture, Storage Plant Begins Construction Large-Scale Industrial Carbon Capture, Storage Plant Begins Construction August 24, 2011 - 1:00pm Addthis Washington, DC - Construction activities have begun at an Illinois ethanol plant that will demonstrate carbon capture and storage. The project, sponsored by the U.S. Department of Energy's Office of Fossil Energy, is the first large-scale integrated carbon capture and storage (CCS) demonstration

  13. Guide to Integrating Renewable Energy in Federal Construction | Department

    Office of Environmental Management (EM)

    of Energy Integrating Renewable Energy in Federal Construction Guide to Integrating Renewable Energy in Federal Construction Document by the Federal Energy Management Program helps federal agencies understand renewable energy options, select appropriate types of renewable energy technologies, and integrate these technologies into all phases of new construction or major renovation projects. PDF icon Download FEMP's Guide to Integrating Renewable Energy. More Documents & Publications U.S.

  14. Hanford Construction Workers Needs Assessment | Department of Energy

    Office of Environmental Management (EM)

    Construction Workers Needs Assessment Hanford Construction Workers Needs Assessment October 1997 This Needs Assessment for former Hanford construction workers was developed for the purpose of collecting existing information relevant to exposure and health outcomes among former workers, utilizing this information to develop viable methods for contacting these former workers, and providing an initial determination of the most significant worker hazards, problems, and concerns for the site. PDF

  15. DOE - Office of Legacy Management -- Website Still Under Construction

    Office of Legacy Management (LM)

    Website Still Under Construction LMBC_tractor Website Under Construction This website is still under construction. Please forgive any temporary interruptions you experience. All comments are welcome To reach the main site visit http://stage.lm.doe.gov/home.aspx This corresponds to Goal 2 of LM's Goals -- Preserve, protect, and make accessible legacy records and information. Click here to view all of LM's Goals and Performance Measures Last Updated: 5/5/2009

  16. Construction Safety Advisory Committee, Meeting Minutes - June 16, 2015 |

    Office of Environmental Management (EM)

    Department of Energy Construction Safety Advisory Committee, Meeting Minutes - June 16, 2015 Construction Safety Advisory Committee, Meeting Minutes - June 16, 2015 June 16, 2015 Topics covered: Mr. Matt Moury, the EHSS Associate Under Secretary, welcomed attendees and recognized the importance and significance of the committee. Six members gave presentations which are available at: http://energy.gov/ehss/2015-construction-safety-workshop-presentations Discussion requested comments to revise

  17. Construction on Pantex High Explosives Pressing Facility Reaches 85% Mark |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration Field Offices / Welcome to the NNSA Production Office / NPO News Releases / Construction on Pantex High Explosives Pressing Facility ... Construction on Pantex High Explosives Pressing Facility Reaches 85% Mark Work on the National Nuclear Security Administration's (NNSA) High Explosives Pressing Facility at its Pantex Plant, located near Amarillo, Texas, this month passed the 85 percent construction completion mark and is on schedule and under

  18. Construction on Pantex High Explosives Pressing Facility Reaches 85% Mark |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration Library / Press Releases / Construction on Pantex High Explosives Pressing Facility ... Construction on Pantex High Explosives Pressing Facility Reaches 85% Mark Press Release Dec 16, 2013 WASHINGTON, D.C. - Work on the National Nuclear Security Administration's (NNSA) High Explosives Pressing Facility at its Pantex Plant, located near Amarillo, Texas, this month passed the 85 percent construction completion mark and is on schedule and under budget.

  19. Texas General Land Office Construction Certificate and Dune Protection...

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - Checklist: Texas General Land Office Construction Certificate and Dune Protection Permit Requirements...

  20. The EXO-200 Detector, Part I: Detector Design And Construction...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: The EXO-200 Detector, Part I: Detector Design And Construction Citation Details In-Document Search Title: The EXO-200 Detector, Part I: Detector Design And...

  1. Nuclear Power 2010 Program: Combined Construction and Operating...

    Broader source: Energy.gov (indexed) [DOE]

    Power 2010 (NP 2010) Construction and Operating LicenseDesign Certification (COLDC) Demonstration program together with the financial incentives provided by the Energy Policy Act...

  2. Indoor airPLUS Construction Specifications Version 1 (Rev. 02...

    Energy Savers [EERE]

    airPLUS Construction Specifications Version 1 (Rev. 02), November 2013, from the U.S. Environmental Protection Agency. PDF icon chiap.pdf More Documents & Publications Indoor...

  3. EPA - Construction General Permit Fact Sheet | Open Energy Information

    Open Energy Info (EERE)

    for a general permit for storm water discharges from construction activities. Author Environmental Protection Agency Published Environmental Protection Agency, 2012 DOI Not...

  4. NDEP - Nevada Construction Stormwater FAQs | Open Energy Information

    Open Energy Info (EERE)

    dealing with construction stormwater permits in Nevada. Author Nevada Division of Environmental Protection Published Nevada Division of Environmental Protection, 2010 DOI...

  5. EPA - Construction General Permit webpage | Open Energy Information

    Open Energy Info (EERE)

    Agency, 2014 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for EPA - Construction General Permit webpage Citation Environmental Protection...

  6. Idaho Well Construction and Drilling Forms Webpage | Open Energy...

    Open Energy Info (EERE)

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Idaho Well Construction and Drilling Forms Webpage Citation Idaho Department...

  7. Hawaii Clean Energy Iniative - Construction Upon a State Highway...

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - Instructions: Hawaii Clean Energy Iniative - Construction Upon a State Highway Permit PacketPermittingRegulatory...

  8. Modesto Irrigation District- Commercial New Construction Rebate Program

    Broader source: Energy.gov [DOE]

    The MPower Business New Construction Rebate Program is available to commercial, industrial, or agricultural customers that presently or will receive electric service from MID. Accounts billed on FL...

  9. EA-1943: Construction and Operation of the Long Baseline Neutrino...

    Office of Environmental Management (EM)

    Neutrino Experiment at Fermilab, Batavia, Illinois, and Sanford Underground Research Facility, Lead, South Dakota EA-1943: Construction and Operation of the Long Baseline...

  10. Requirements for Petitions to Construct Electric and Gas Facilities...

    Open Energy Info (EERE)

    requirements for petitions to construct electric generation, electric transmission, and natural gas facilities pursuant to 30 V.S.A. 248. In addition, the rule clarifies...

  11. Best Practices Case Study: Nelson Construction, Hamilton Way, Farmingon, CT

    SciTech Connect (OSTI)

    2011-01-03

    Building America's research team lead Building Science Corporation helped Nelson Construction achieve HERS scores of 53 and 54 on ten homes in Farmington, Connecticut.

  12. Vectren Energy Delivery of Indiana (Electric)- Commercial New Construction Rebates

    Broader source: Energy.gov [DOE]

    Vectren Energy Delivery offers commercial customers in Indiana electric rebates for the installation of certain types of equipment in newly constructed buildings through its Energy Design Assist...

  13. Floodplain and Wetlands Assessment for Construction of a Second...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of a Second Full Service Access Road over Lena Gulch Floodplain and Wetlands Assessment for Construction of a Second Full Service Access Road over Lena Gulch Floodplain ...

  14. DTE Energy- Commercial New Construction Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    New Construction/Remodeling projects require descriptions of the proposed project, all facilities that will be affected by the project, detail cost breakdown by measure, architectural drawings,...

  15. SFCC receives $1 million grant for Youth Construction Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SFCC Receives Grant for Youth Construction Program Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: Dec. 2015-Jan. 2016...

  16. RAPID/BulkTransmission/General Construction | Open Energy Information

    Open Energy Info (EERE)

    RAPIDBulkTransmissionGeneral Construction < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk...

  17. Texas Large Construction Site Notice for Secondary Operators...

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Reference: Texas Large Construction Site Notice for Secondary Operators Published Texas Commission on Environmental...

  18. Texas Large Construction Site Notice for Primary Operators |...

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Reference: Texas Large Construction Site Notice for Primary Operators Published Texas Commission on Environmental...

  19. Construction, Qualification, and Low Rate Production Start-up...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manufacturing Facility with Capacity to Support 100,000 Electric Drive Vehicles Construction, Qualification, and Low Rate Production Start-up of a DC Bus Capacitor High Volume...

  20. Construction progresses at GE's Oil & Gas Technology Center ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home > Impact > Construction progressing at GE's newest research center, the Oil & Gas Technology Center in Oklahoma City Click to email this to a friend (Opens in new window)...

  1. Title 43 CFR 3272 Utilization Plan and Facility Construction...

    Open Energy Info (EERE)

    2 Utilization Plan and Facility Construction Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title...

  2. Construction Underway on First Geothermal Power Plant in New Mexico

    Broader source: Energy.gov [DOE]

    New Mexico Governor Bill Richardson and Raser Technologies, Inc. announced in late August that construction has begun on the first commercial geothermal power plant in New Mexico.

  3. Application for Permit to Construct Access Driveway Facilities...

    Open Energy Info (EERE)

    Permit to Construct Access Driveway Facilities on Highway ROW Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit...

  4. Vermont Construction and Operation of Net Metering Systems Rules...

    Open Energy Info (EERE)

    rule is applicable to all net metered installations in Vermont, and applies to every person, firm, company, corporation and municipality engaged in the construction or operation...

  5. Vermont Construction and Operation of Net Metering Systems Rule...

    Open Energy Info (EERE)

    rule is applicable to all net metered installations in Vermont, and applies to every person, firm, company, corporation and municipality engaged in the construction or operation...

  6. The New Mexico Building and Construction Trades Council and Los...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    sign labor agreements September 21, 2012 Unions, LANL sign labor agreements The New Mexico Building and Construction Trades Council and Los Alamos National Security LLC, have...

  7. RAPID/Geothermal/General Construction | Open Energy Information

    Open Energy Info (EERE)

    that include construction for any phase of exploration, drilling, or potential development of power generating facilities require numerous permits from federal, state,...

  8. Genomic library construction (Patent) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Details In-Document Search Title: Genomic library construction Compositions and methods for amplifying nucleic acid sequences from a single cell are provided. Compositions...

  9. ODEQ - Construction Stormwater Erosion and Sediment Control Manual...

    Open Energy Info (EERE)

    Erosion and Sediment Control Manual Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: ODEQ - Construction...

  10. California Construction Storm Water Program Website | Open Energy...

    Open Energy Info (EERE)

    California's Construction Storm Water Program. Author California State Water Resources Control Board Published California State Water Resources Control Board, Date Not Provided DOI...

  11. Lab provides environmental support for county construction projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Latest Issue: Dec. 2015-Jan. 2016 all issues All Issues submit Lab provides environmental support for county construction projects A face-lift for Ashley Pond November 1,...

  12. City of Palo Alto Utilities- New Construction Commercial Rebate Program

    Broader source: Energy.gov [DOE]

    The City of Palo Alto's "Business New Construction Rebate Program" provides financial incentives for commercial, municipal, and school buildings built to the program's energy efficiency standards. ...

  13. Meiden Plant and Engineering Construction Co Ltd | Open Energy...

    Open Energy Info (EERE)

    search Name: Meiden Plant and Engineering Construction Co Ltd Place: Tokyo, Tokyo, Japan Zip: 141-8616 Sector: Hydro, Solar, Wind energy Product: Meiden Plant and...

  14. Construction Review | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SC construction projects and large experimental equipment. These reviews are known as "Lehman Reviews" after the Division Director, Dan Lehman. Lehman Reviews are widely known in...

  15. Idaho Permit to Construct Application Webpage | Open Energy Informatio...

    Open Energy Info (EERE)

    Idaho Permit to Construct Application Webpage Abstract This webpage provides access to air quality permitting forms and checklists for Idaho's air quality permitting process....

  16. Construction and Minor Permit Applications | Open Energy Information

    Open Energy Info (EERE)

    to library Web Site: Construction and Minor Permit Applications Author Division of Air Quality Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for...

  17. Washington Air Quality Notice of Construction Permit Regulatory...

    Open Energy Info (EERE)

    Air Quality Notice of Construction Permit Regulatory Handbook Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook:...

  18. Y-12 Construction maintains 'superb' safety performance | Y-12...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B&W Y-12 vice president of projects, presents Construction's safety awards to Monica Lewis, Y-12 craft safety lead representative, and Kevin Adkisson, Knoxville Building and...

  19. Washington Notice of Construction Application under New Source...

    Open Energy Info (EERE)

    Notice of Construction Application Organization State of Washington Department of Ecology Published Publisher Not Provided, 12013 DOI Not Provided Check for DOI availability:...

  20. Computer-Aided Construction of Combustion Chemistry Models

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Constructing Accurate Combustion Chemistry Models: Butanols William H. Green & Michael Harper MIT Dept. of Chem. Eng. CEFRC Annual Meeting, Sept. 2010 The people who did this work:...

  1. Good Year - Bad Year Financial Planning Workshop handout - April...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    unit's financial reserve balance at the end of a year or be used as an input for a TPP assessment. This metric is the most direct measure of BPA's ability to pay Treasury....

  2. Visualizing Twenty Years of Applications

    SciTech Connect (OSTI)

    Potel, Mike; Wong, Pak C.

    2014-11-01

    This issue of IEEE Computer Graphics and Applications marks the 20th anniversary of the Applications department as a regular feature of the magazine. We thought it might be interesting to look back at the 20 years of Applications department articles to assess its evolution over that time. By aggregating all twenty years of articles and applying a little statistical and visual analytics, weve uncovered some interesting characteristics and trends we thought wed share to mark this 20 year milestone.

  3. AISI-DOE Direct Steelmaking Program. Annual report for the year ending November 30, 1993

    SciTech Connect (OSTI)

    Aukrust, E.

    1994-02-01

    This program has completed its 5th year since cost-share funding provided by DOE. The following tasks are reported on: budget, patents, talks, and publications; design and construction of gas cleaning and tempering loop; construction of pressurized smelter and operation of combined smelter and offgas system; study for ironmaking demonstration plant and for steelmaking processes; and laboratory research programs at universities and companies.

  4. 2014 Year-in-Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Year-in-Review i 2014 YIR May 2015 Year-in-Review: 2014 Energy Infrastructure Events and Expansions Office of Electricity Delivery and Energy Reliability U.S. Department of Energy For Further Information This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and Thomas Roston, Acting Deputy Assistant Secretary. Specific questions about this report may be directed to John Ostrich, Office of Electricity

  5. Planning for Years to Come

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education Tours for LANL stakeholders provide first-hand experiences and opportunities for input. LANL's Governing Policy on the Environment "We are committed to act as stewards of our environment to achieve our mission in accordance with all applicable environmental requirements. We set continual improvement objectives and

  6. PORTSMOUTH 2015 YEAR IN REVIEW

    Energy Savers [EERE]

    PORTSMOUTH 2015 YEAR IN REVIEW At the Portsmouth site this year, it was critical to have alignment among regulatory decisions and agreements, deactivation, shipping, and preliminary work on the on-site waste disposal facility. In 2015, we made significant progress in all of those areas. Our workforce performed admirably in 2015 and we look forward to continuing our momentum in 2016." - Dr. Vincent Adams, Portsmouth Site Director, DOE Portsmouth/Paducah Project Office KEY ACCOMPLISHMENTS 

  7. Sustainability in Federal Building New Construction and Major Renovations

    Broader source: Energy.gov [DOE]

    The Guiding Principles require agencies to design, construct, and operate high-performance and sustainable buildings. New construction and major renovations to existing buildings offer agencies opportunities to incorporate energy-efficient designs, sustainable siting and materials, and renewable energy technologies into federal facilities.

  8. Enhanced Geothermal Systems (EGS) Well Construction Technology Evaluation Report

    SciTech Connect (OSTI)

    Polsky, Yarom; Capuano, Louis; Finger, John; Huh, Michael; Knudsen, Steve; Chip, A.J. Mansure; Raymond, David; Swanson, Robert

    2008-12-01

    This report provides an assessment of well construction technology for EGS with two primary objectives: 1. Determining the ability of existing technologies to develop EGS wells. 2. Identifying critical well construction research lines and development technologies that are likely to enhance prospects for EGS viability and improve overall economics.

  9. Compositions and method of use of constructed microbial mats

    DOE Patents [OSTI]

    Bender, Judith A. (Atlanta, GA); Phillips, Peter C. (Decatur, GA)

    1997-01-01

    Compositions and methods of use of constructed microbial mats, comprising cyanobacteria and purple autotrophic bacteria and an organic nutrient source, in a laminated structure, are described. The constructed microbial mat is used for bioremediation of different individual contaminants and for mixed or multiple contaminants, and for production of beneficial compositions and molecules.

  10. Unique Lanthide-Free Motor Construction | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon ape044_lutz_2012_o.pdf More Documents & Publications Unique Lanthide-Free Motor Construction Vehicle Technologies Office Merit Review 2014: Unique Lanthide-Free Motor Construction

  11. Unique Lanthide-Free Motor Construction | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon ape044_lutz_2013_o.pdf More Documents & Publications Vehicle Technologies Office Merit Review 2014: Unique Lanthide-Free Motor Construction Unique Lanthide-Free Motor Construction

  12. Draft dry year tools (generation/planning)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA White Book Dry Year Tools Firstgov Dry Year Tools November 9, 2006 - Final Dry Year Guide: The Final Dry Year Guide (PDF, 5 pages, 44 kb) and Figure 1 - Dry Year Strategy (PDF,...

  13. Photovoltaic energy: Program overview, fiscal year 1990

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    This summary is prepared each year to provide an overview of the government-funded activities within the National Photovoltaics Program. The 1990 PV Program Achievements are listed. Launched the PV Manufacturing Technology initiative, designed to systematically lower PV module costs. Inaugurated the PV Concentrator Technologies Initiative by signing eight multiyear, cost-shared technology development subcontracts with concentrator companies. Established the PV Polycrystalline Thin-Film Initiative by signing six multiyear, cost-shared technology development subcontracts with six polycrystalline thin-film companies. Continued the Amorphous Silicon Project by awarding three new research and development contracts. Focused the resources of three program laboratories on finding solutions to industry's manufacturing problems: the Photovoltaic Device Fabrication Laboratory at Sandia National Laboratories and the Module Failure Analysis Laboratory and the Encapsulant Research Laboratory at SERI. Established an ongoing program to assist utilities in using PV for cost-effective, high-value applications. Completed nearly all of the construction planned for the first phase of PVUSA at Davis, California. Worked with the crystalline silicon PV industry on novel, low-cost cell fabrication processes and on resolving encapsulant problems. Took part in the development of qualification procedures tests for thin- and thick-film flat-plate modules and concentrator modules.

  14. Argonne National Laboratory-West Former Workers, Construction Worker Screening Projects

    Broader source: Energy.gov [DOE]

    Argonne National Laboratory-West Former Construction Workers (now known as Idaho National Laboratory), Construction Worker Screening Projects

  15. LNG to the year 2000

    SciTech Connect (OSTI)

    Davenport, S.T.

    1984-04-01

    By 2000, about 190 MM metric-tpy of LNG will be moving in world trade, with Asia-Pacific as the dominant producer By the year 2000, approximately 190 million metric tons per year of LNG will be moving in worldwide trade. Production of LNG will be spread throughout most of the world, with Asia-Pacific as the dominant producer. LNG will be delivered only to the heavily industrialized areas of North America, Europe and Asia-Pacific. The success of any LNG project will be dependent on its individual economics, market needs, financial planning, and governmental permit processes. We hope industry will be able to put together the LNG projects required to meet the quanitities of production forecast here for the year 2000.

  16. Buildings Energy Data Book: 1.3 Value of Construction and Research

    Buildings Energy Data Book [EERE]

    5 2007-2010 Investment into Construction and Energy R&D, by Selected Country Year United States 2007 0.1 0.6 Australia 2010 5.2 1.8 China 2009 1.3 2.5 France 2007 0.4 1.6 Germany 2008 0.1 0.3 Italy 2010 0.9 0.8 Japan 2009 1.0 0.5 Norway 2008 1.4 2.2 Portugal 2008 1.7 6.0 South Africa 2007 0.1 16.2 South Korea 2008 2.5 1.0 United Kingdom 2008 0.1 0.2 Note(s): Source(s): Includes all construction (e.g., bridges, roads, dams, buildings, etc.). National Science Board, Science and Engineering

  17. Buildings Energy Data Book: 1.3 Value of Construction and Research

    Buildings Energy Data Book [EERE]

    8 Number of Construction Employees and Total Employees for Select Building Envolope Industries (Thousand Employees) Poured Concrete Foundation and Structure Contractors (NAICS 238110) -Total Employment -Construction/Extraction Occupations -Construction/Extraction % of Total Masonry Contractors (NAICS 238140) -Total Employment -Construction/Extraction Occupations -Construction/Extraction % of Total Roofing Contractors (NAICS 238160) -Total Employment -Construction/Extraction Occupations

  18. Advances in technology for the construction of deep-underground facilities

    SciTech Connect (OSTI)

    Not Available

    1987-12-31

    The workshop was organized in order to address technological issues important to decisions regarding the feasibility of strategic options. The objectives of the workshop were to establish the current technological capabilities for deep-underground construction, to project those capabilities through the compressed schedule proposed for construction, and to identify promising directions for timely allocation of existing research and development resources. The earth has been used as a means of protection and safekeeping for many centuries. Recently, the thickness of the earth cover required for this purpose has been extended to the 2,000- to 3,000-ft range in structures contemplated for nuclear-waste disposal, energy storage, and strategic systems. For defensive missile basing, it is now perceived that the magnitude of the threat has increased through better delivery systems, larger payloads, and variable tactics of attack. Thus, depths of 3,000 to 8,000 ft are being considered seriously for such facilities. Moreover, it appears desirable that the facilities be operational (if not totally complete) for defensive purposes within a five-year construction schedule. Deep excavations such as mines are similar in many respects to nearsurface tunnels and caverns for transit, rail, sewer, water, hydroelectric, and highway projects. But the differences that do exist are significant. Major distinctions between shallow and deep construction derive from the stress fields and behavior of earth materials around the openings. Different methodologies are required to accommodate other variations resulting from increased depth, such as elevated temperatures, reduced capability for site exploration, and limited access during project execution. This report addresses these and other questions devoted to geotechnical characterization, design, construction, and excavation equipment.

  19. FEMP Year in Review 2009

    SciTech Connect (OSTI)

    2009-12-01

    In 2009, the Federal Energy Management Program (FEMP)undertook an ambitious reorganization of its program structure to be more responsive to the needs of its Federal agency customers. In this Year in Review 2009, you will learn more about FEMP achievements under its new program areas.

  20. Calendar Year Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Calendar Year Reports Calendar Year Reports Audit, Inspection and Other Reports The majority of Office of Inspector General reports are public. Certain reports, however, are not public as they contain information that is protected by the Freedom of Information Act (FOIA) and Privacy Act. The provisions of these acts determine the availability of these reports. Calendar Year 2015 Calendar Year 2014 Calendar Year 2013 Calendar Year 2012 Calendar Year 2011 Calendar Year 2010 Calendar Year 2009