  1. Why cogeneration developers should support cogeneration deferral riders

    SciTech Connect (OSTI)

    Spiewak, S.

    1987-04-01

    The author argues that excess capacity can increase retail rates, but deferral riders which allow utilities to offer lower rates to customers who might otherwise turn to cogeneration would optimize existing generating capacity. The author notes that encouraging cogeneration is only one goal of the Public Utility Regulatory Policies Act, while efficient use of powerplant capability is of equal importance. There will still be opportunities for cogenerators under the Cogeneration Deferral Tariff if they are patient because the concept of the tariff is to defer, not preclude cogeneration.

  2. BALANCE

    DOE Patents [OSTI]

    Carmichael, H.

    1953-01-01

    A torsional-type analytical balance designed to arrive at its equilibrium point more quickly than previous balances is described. In order to prevent external heat sources creating air currents inside the balance casing that would reiard the attainment of equilibrium conditions, a relatively thick casing shaped as an inverted U is placed over the load support arms and the balance beam. This casing is of a metal of good thernnal conductivity characteristics, such as copper or aluminum, in order that heat applied to one portion of the balance is quickly conducted to all other sensitive areas, thus effectively preventing the fornnation of air currents caused by unequal heating of the balance.

  3. Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.

    SciTech Connect (OSTI)

    Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr.

    2005-11-01

    This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

  4. Fact #871: May 4, 2015 Most Manufacturers Have Positive CAFE Credit Balances at the End of Model Year 2013

    Broader source: Energy.gov [DOE]

    At the end of the 2013 model year (MY), Toyota, which neither bought nor sold credits between 2010 and 2013, had by far the highest balance of Corporate Average Fuel Economy (CAFE) credits at more...

  5. Steam System Balancing and Tuning for Multifamily Residential Buildings in Chicagoland - Second Year of Data Collection

    SciTech Connect (OSTI)

    Choi, J.; Ludwig, P.; Brand, L.

    2013-08-01

    Steam heated buildings often suffer from uneven heating as a result of poor control of the amount of steam entering each radiator. In order to satisfy the heating load to the coldest units, other units are overheated. As a result, some tenants complain of being too hot and open their windows in the middle of winter, while others complain of being too cold and are compelled to use supplemental heat sources. Building on previous research, CNT Energy identified 10 test buildings in Chicago and conducted a study to identify best practices for the methodology, typical costs, and energy savings associated with steam system balancing. A package of common steam balancing measures was assembled and data were collected on the buildings before and after these retrofits were installed to investigate the process, challenges, and the cost effectiveness of improving steam systems through improved venting and control systems. The test buildings that received venting upgrades and new control systems showed 10.2% savings on their natural gas heating load, with a simple payback of 5.1 years. The methodologies for and findings from this study are presented in detail in this report. This report has been updated from a version published in August 2012 to include natural gas usage information from the 2012 heating season and updated natural gas savings calculations.

  6. Fact #871: May 4, 2015 Most Manufacturers Have Positive CAFE Credit Balances at the End of Model Year 2013 – Dataset

    Broader source: Energy.gov [DOE]

    Excel file and dataset for Most Manufacturers Have Positive CAFE Credit Balances at the End of Model Year 2013

  7. Electric utility transmission and distribution upgrade deferral benefits from modular electricity storage : a study for the DOE Energy Storage Systems Program.

    SciTech Connect (OSTI)

    Eyer, James M.

    2009-06-01

    The work documented in this report was undertaken as part of an ongoing investigation of innovative and potentially attractive value propositions for electricity storage by the United States Department of Energy (DOE) and Sandia National Laboratories (SNL) Electricity Storage Systems (ESS) Program. This study characterizes one especially attractive value proposition for modular electricity storage (MES): electric utility transmission and distribution (T&D) upgrade deferral. The T&D deferral benefit is characterized in detail. Also presented is a generalized framework for estimating the benefit. Other important and complementary (to T&D deferral) elements of possible value propositions involving MES are also characterized.

  8. Audit Report - Department of Energy's Isotope Development and Production for Research and Applications Program's Fiscal Year 2010 Balance Sheet Audit, OAS-FS-13-09

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy's Isotope Development and Production for Research and Applications Program's Fiscal Year 2010 Balance Sheet Audit OAS-FS-13-09 January 2013 MEMORANDUM FOR THE DIRECTOR, OFFICE OF SCIENCE FROM: Daniel M. Weeber Assistant Inspector General for Office of Inspector General SUBJECT: INFORMATION Production for Research and Applications Program's Fiscal Year 2010 Balance Sheet Audit The attached report presents the results of the independent certified public accountants' audit of

  9. YEAR

    National Nuclear Security Administration (NNSA)

    YEAR 2014 AVERAGE AGE 48.6 UNDER 30 2 30-39 5 40-49 8 50-59 17 60-69 3 70 AND UP 0 YEAR 2014 AVERAGE LENGTH 16.3 LESS THAN 10 YEARS 11 10-19 YEARS 10 20-29 YEARS 11 30-39 YEARS 3 ...

  10. YEAR

    National Nuclear Security Administration (NNSA)

    69 YEAR 2014 Males 34 Females 35 YEAR 2014 SES 5 EJEK 1 EN 05 8 EN 04 5 NN (Engineering) 27 NQ (ProfTechAdmin) 22 NU (TechAdmin Support) 1 YEAR 2014 American Indian Alaska...

  11. YEAR

    National Nuclear Security Administration (NNSA)

    42 YEAR 2014 Males 36 Females 6 PAY PLAN YEAR 2014 SES 2 EJEK 5 EN 05 7 EN 04 6 EN 03 1 NN (Engineering) 15 NQ (ProfTechAdmin) 6 YEAR 2014 American Indian Alaska Native Male...

  12. YEAR

    National Nuclear Security Administration (NNSA)

    4 YEAR 2012 Males 65 Females 29 YEAR 2012 SES 3 EJEK 5 EN 04 3 NN (Engineering) 21 NQ (ProfTechAdmin) 61 NU (TechAdmin Support) 1 YEAR 2012 American Indian Male 0 American...

  13. YEAR

    National Nuclear Security Administration (NNSA)

    4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJEK 1 EN 03 1 NN (Engineering) 3 NQ (ProfTechAdmin) 31 NU (TechAdmin Support) 5 YEAR 2011 American Indian Male 0 American...

  14. YEAR

    National Nuclear Security Administration (NNSA)

    92 YEAR 2012 Males 52 Females 40 YEAR 2012 SES 1 EJEK 7 EN 04 13 EN 03 1 NN (Engineering) 27 NQ (ProfTechAdmin) 38 NU (TechAdmin Support) 5 YEAR 2012 American Indian Male 0...

  15. YEAR

    National Nuclear Security Administration (NNSA)

    558 YEAR 2013 Males 512 Females 46 YEAR 2013 SES 2 EJEK 2 EN 04 1 NN (Engineering) 11 NQ (ProfTechAdmin) 220 NU (TechAdmin Support) 1 NV (Nuc Mat Courier) 321 YEAR 2013...

  16. YEAR

    National Nuclear Security Administration (NNSA)

    11 YEAR 2012 Males 78 Females 33 YEAR 2012 SES 2 EJEK 9 EN 05 1 EN 04 33 NN (Engineering) 32 NQ (ProfTechAdmin) 31 NU (TechAdmin Support) 3 YEAR 2012 American Indian Male 2...

  17. YEAR

    National Nuclear Security Administration (NNSA)

    300 YEAR 2011 Males 109 Females 191 YEAR 2011 SES 9 EJEK 1 NN (Engineering) 2 NQ (ProfTechAdmin) 203 NU (TechAdmin Support) 38 NF (Future Ldrs) 47 YEAR 2011 American Indian...

  18. YEAR

    National Nuclear Security Administration (NNSA)

    02 YEAR 2011 Males 48 Females 54 YEAR 2011 SES 5 EJEK 1 NN (Engineering) 13 NQ (ProfTechAdmin) 80 NU (TechAdmin Support) 3 YEAR 2011 American Indian Male 0 American Indian...

  19. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2013 Males 27 Females 11 YEAR 2013 SES 1 EN 05 1 EN 04 11 NN (Engineering) 8 NQ (ProfTechAdmin) 15 NU (TechAdmin Support) 2 YEAR 2013 American Indian Alaska Native Male...

  20. YEAR

    National Nuclear Security Administration (NNSA)

    31 YEAR 2013 Males 20 Females 11 YEAR 2013 SES 2 EN 04 4 NN (Engineering) 12 NQ (ProfTechAdmin) 12 NU (TechAdmin Support) 1 YEAR 2013 American Indian Alaska Native Male (AIAN,...

  1. YEAR

    National Nuclear Security Administration (NNSA)

    16 YEAR 2012 Males 84 Females 32 YEAR 2012 SES 26 EJEK 2 EN 05 9 NN (Engineering) 39 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 10 YEAR 2012 American Indian Male 0 American...

  2. YEAR

    National Nuclear Security Administration (NNSA)

    34 YEAR 2012 Males 66 Females 68 YEAR 2012 SES 6 NN (Engineering) 15 NQ (ProfTechAdmin) 110 NU (TechAdmin Support) 3 YEAR 2012 American Indian Male 1 American Indian Female 2...

  3. YEAR

    National Nuclear Security Administration (NNSA)

    86 YEAR 2012 Males 103 Females 183 YEAR 2012 SES 7 EJEK 1 NN (Engineering) 1 NQ (ProfTechAdmin) 202 NU (TechAdmin Support) 30 NF (Future Ldrs) 45 YEAR 2012 American Indian Male...

  4. YEAR

    National Nuclear Security Administration (NNSA)

    80 YEAR 2012 Males 51 Females 29 YEAR 2012 SES 1 EJEK 22 EN 04 21 NN (Engineering) 14 NQ (ProfTechAdmin) 21 NU (TechAdmin Support) 1 YEAR 2012 American Indian Male 0 American...

  5. YEAR

    National Nuclear Security Administration (NNSA)

    1 YEAR 2012 Males 30 Females 11 YEAR 2012 SES 1 EN 05 1 EN 04 11 NN (Engineering) 9 NQ (ProfTechAdmin) 17 NU (TechAdmin Support) 2 YEAR 2012 American Indian Male 0 American...

  6. YEAR

    National Nuclear Security Administration (NNSA)

    96 YEAR 2013 Males 69 Females 27 YEAR 2013 SES 1 EJEK 9 EN 04 27 NN (Engineering) 26 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 3 YEAR 2013 American Indian Alaska Native Male...

  7. YEAR

    National Nuclear Security Administration (NNSA)

    31 YEAR 2012 Males 19 Females 12 YEAR 2012 SES 2 EN 04 4 NN (Engineering) 12 NQ (ProfTechAdmin) 12 NU (TechAdmin Support) 1 YEAR 2012 American Indian Male 0 American Indian...

  8. YEAR

    National Nuclear Security Administration (NNSA)

    0 YEAR 2013 Males 48 Females 32 YEAR 2013 SES 2 EJEK 7 EN 04 11 EN 03 1 NN (Engineering) 23 NQ (ProfTechAdmin) 33 NU (TechAdmin Support) 3 YEAR 2013 American Indian Alaska...

  9. YEAR

    National Nuclear Security Administration (NNSA)

    40 YEAR 2011 Males 68 Females 72 YEAR 2011 SES 5 EJEK 1 NN (Engineering) 16 NQ (ProfTechAdmin) 115 NU (TechAdmin Support) 3 YEAR 2011 American Indian Male 1 American Indian...

  10. YEAR

    National Nuclear Security Administration (NNSA)

    00 YEAR 2012 Males 48 Females 52 YEAR 2012 SES 5 EJEK 1 NN (Engineering) 11 NQ (ProfTechAdmin) 80 NU (TechAdmin Support) 3 YEAR 2012 American Indian Male 0 American Indian...

  11. YEAR

    National Nuclear Security Administration (NNSA)

    137 YEAR 2013 Males 90 Females 47 YEAR 2013 SES 2 SL 1 EJEK 30 EN 04 30 EN 03 2 NN (Engineering) 23 NQ (ProfTechAdmin) 45 NU (TechAdmin Support) 4 YEAR 2013 American Indian...

  12. YEAR

    National Nuclear Security Administration (NNSA)

    of Employees 14 GENDER YEAR 2012 Males 9 Females 5 YEAR 2012 SES 2 EJEK 2 NN (Engineering) 4 NQ (ProfTechAdmin) 6 YEAR 2012 American Indian Male 0 American Indian Female 0...

  13. YEAR

    National Nuclear Security Administration (NNSA)

    3 YEAR 2012 Males 21 Females 22 YEAR 2012 SES 3 EJEK 1 EN 03 1 NN (Engineering) 3 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 5 YEAR 2012 American Indian Male 0 American...

  14. YEAR

    National Nuclear Security Administration (NNSA)

    Males 139 Females 88 YEAR 2012 SES 13 EX 1 EJEK 8 EN 05 23 EN 04 20 EN 03 2 NN (Engineering) 91 NQ (ProfTechAdmin) 62 NU (TechAdmin Support) 7 YEAR 2012 American Indian...

  15. YEAR

    National Nuclear Security Administration (NNSA)

    563 YEAR 2012 Males 518 Females 45 YEAR 2012 SES 1 EJEK 2 EN 04 1 EN 03 1 NN (Engineering) 12 NQ (ProfTechAdmin) 209 NU (TechAdmin Support) 2 NV (Nuc Mat Courier) 335 YEAR 2012...

  16. YEAR

    National Nuclear Security Administration (NNSA)

    7 YEAR 2012 Males 64 Females 33 YEAR 2012 SES 2 EJEK 3 EN 05 1 EN 04 30 EN 03 1 NN (Engineering) 26 NQ (ProfTechAdmin) 32 NU (TechAdmin Support) 2 YEAR 2012 American Indian...

  17. YEAR

    National Nuclear Security Administration (NNSA)

    4 YEAR 2012 Males 37 Females 7 YEAR 2012 SES 1 EJEK 6 EN 05 5 EN 04 7 EN 03 1 NN (Engineering) 17 NQ (ProfTechAdmin) 6 NU (TechAdmin Support) 1 YEAR 2012 American Indian Male 2...

  18. YEAR

    National Nuclear Security Administration (NNSA)

    7 YEAR 2011 Males 38 Females 9 YEAR 2011 SES 1 EJEK 6 EN 05 5 EN 04 7 EN 03 1 NN (Engineering) 19 NQ (ProfTechAdmin) 7 NU (TechAdmin Support) 1 YEAR 2011 American Indian Male 2...

  19. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2013 Males 62 Females 26 YEAR 2013 SES 1 EJEK 3 EN 05 1 EN 04 28 EN 03 1 NN (Engineering) 25 NQ (ProfTechAdmin) 27 NU (TechAdmin Support) 2 YEAR 2013 American Indian...

  20. YEAR

    National Nuclear Security Administration (NNSA)

    6 YEAR 2012 Males 64 Females 32 YEAR 2012 SES 1 EJEK 5 EN 05 3 EN 04 23 EN 03 9 NN (Engineering) 18 NQ (ProfTechAdmin) 33 NU (TechAdmin Support) 4 YEAR 2012 American Indian...

  1. YEAR

    National Nuclear Security Administration (NNSA)

    5 YEAR 2013 Males 58 Females 27 YEAR 2013 SES 1 EJEK 4 EN 05 3 EN 04 21 EN 03 8 NN (Engineering) 16 NQ (ProfTechAdmin) 28 NU (TechAdmin Support) 4 YEAR 2013 American Indian...

  2. YEAR

    National Nuclear Security Administration (NNSA)

    78 YEAR 2012 Males 57 Females 21 YEAR 2012 SES 2 SL 1 EJEK 12 EN 04 21 EN 03 2 NN (Engineering) 12 NQ (ProfTechAdmin) 24 NU (TechAdmin Support) 4 YEAR 2012 American Indian Male...

  3. YEAR

    National Nuclear Security Administration (NNSA)

    2012 Males 149 Females 115 YEAR 2012 SES 17 EX 1 EJEK 7 EN 05 2 EN 04 9 EN 03 2 NN (Engineering) 56 NQ (ProfTechAdmin) 165 NU (TechAdmin Support) 4 GS 13 1 YEAR 2012 American...

  4. Management Letter on the Department of Energy's Isotope Development and Production for Research and Applications Program's Fiscal Year 2009 Balance Sheet Audit, OAS-FS-12-09

    Energy Savers [EERE]

    09 Balance Sheet Audit OAS-FS-12-09 June 2012 January 30, 2012 Mr. Gregory Friedman, Inspector General Dr. Jehanne Gillo, Director, Facilities and Project Management Division, Office of Nuclear Physics U.S. Department of Energy Washington, DC 20585 Dear Mr. Friedman and Dr. Gillo: We have audited the balance sheet of the United States Department of Energy's (Department or DOE) Isotope Development and Production for Research and Applications Program (the Program) (a component of the Department)

  5. YEAR

    National Nuclear Security Administration (NNSA)

    5 YEAR 2014 Males 61 Females 24 PAY PLAN YEAR 2014 SES 1 EJ/EK 8 EN 04 22 NN (Engineering) 23 NQ (Prof/Tech/Admin) 28 NU (Tech/Admin Support) 3 YEAR 2014 American Indian Alaska Native Male (AIAN M) 2 American Indian Alaskan Native Female (AIAN F) 3 African American Male (AA M) 0 African American Female (AA F) 0 Asian American Pacific Islander Male (AAPI M) 3 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 13 Hispanic Female (H F) 10 White Male (W M) 43 White Female (W F) 11

  6. YEAR

    National Nuclear Security Administration (NNSA)

    82 YEAR 2014 Males 57 Females 25 PAY PLAN YEAR 2014 SES 3 EJ/EK 4 EN 04 2 NN (Engineering) 20 NQ (Prof/Tech/Admin) 53 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 9 African American Female (AA F) 9 Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 3 Hispanic Female (H F) 5 White Male (W M) 43 White Female (W F) 10 DIVERSITY TOTAL WORKFORCE

  7. YEAR

    National Nuclear Security Administration (NNSA)

    93 YEAR 2014 Males 50 Females 43 PAY PLAN YEAR 2014 EJ/EK 3 NN (Engineering) 13 NQ (Prof/Tech/Admin) 74 NU (Tech/Admin Support) 3 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 2 African American Male (AA M) 5 African American Female (AA F) 6 Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 6 Hispanic Female (H F) 14 White Male (W M) 39 White Female (W F) 21 DIVERSITY

  8. YEAR

    National Nuclear Security Administration (NNSA)

    YEAR 2014 Males 11 Females 2 PAY PLAN YEAR 2014 SES 2 EJ/EK 1 EN 04 1 NN (Engineering) 5 NQ (Prof/Tech/Admin) 4 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 0 African American Female (AA F) 0 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 10 White Female (W F) 2 DIVERSITY TOTAL WORKFORCE GENDER

  9. YEAR

    National Nuclear Security Administration (NNSA)

    9 YEAR 2014 Males 9 Females 10 YEAR 2014 SES 7 ED 1 EJ/EK 1 EN 05 1 NQ (Prof/Tech/Admin) 8 NU (Tech/Admin Support) 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 1 African American Female (AA F) 5 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 3 White Male (W M) 7 White Female (W F) 1 PAY PLAN DIVERSITY TOTAL

  10. YEAR

    National Nuclear Security Administration (NNSA)

    5 YEAR 2014 Males 92 Females 43 YEAR 2014 SES 8 EX 1 EJ/EK 4 EN 05 9 EN 04 12 EN 03 2 NN (Engineering) 57 NQ (Prof/Tech/Admin) 42 YEAR 2014 American Indian Alaska Native Male (AIAN M) 1 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 9 African American Female (AA F) 11 Asian American Pacific Islander Male (AAPI M) 4 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 12 Hispanic Female (H F) 7 White Male (W M) 66 White Female (W F) 22 PAY PLAN

  11. YEAR

    National Nuclear Security Administration (NNSA)

    563 YEAR 2014 Males 517 Females 46 PAY PLAN YEAR 2014 SES 2 EJ/EK 2 EN 04 1 NN (Engineering) 11 NQ (Prof/Tech/Admin) 218 NU (Tech/Admin Support) 2 NV (Nuc Mat Courier) 327 YEAR 2014 American Indian Alaska Native Male (AIAN M) 14 American Indian Alaskan Native Female (AIAN F) 2 African American Male (AA M) 18 African American Female (AA F) 1 Asian American Pacific Islander Male (AAPI M) 8 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 76 Hispanic Female (H F) 21 White Male

  12. YEAR

    National Nuclear Security Administration (NNSA)

    89 YEAR 2014 Males 98 Females 91 PAY PLAN YEAR 2014 SES 14 EX 1 EJ/EK 3 EN 05 1 EN 04 4 EN 03 1 NN (Engineering) 32 NQ (Prof/Tech/Admin) 130 NU (Tech/Admin Support) 2 GS 15 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 1 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 5 African American Female (AA F) 14 Asian American Pacific Islander Male (AAPI M) 3 Asian American Pacific Islander Female (AAPI F) 7 Hispanic Male (H M) 7 Hispanic Female (H F) 10 White Male

  13. YEAR

    National Nuclear Security Administration (NNSA)

    43 YEAR 2014 Males 162 Females 81 PAY PLAN YEAR 2014 SES 26 EJ/EK 3 EN 05 7 NN (Engineering) 77 NQ (Prof/Tech/Admin) 108 NU (Tech/Admin Support) 22 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 5 African American Female (AA F) 9 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 2 Hispanic Female (H F) 0 White Male (W M) 154 White Female (W F)

  14. YEAR

    National Nuclear Security Administration (NNSA)

    74 YEAR 2014 Males 96 Females 78 PAY PLAN YEAR 2014 SES 8 EJ/EK 4 EN 04 11 EN 03 1 NN (Engineering) 34 NQ (Prof/Tech/Admin) 113 NU (Tech/Admin Support) 3 YEAR 2014 American Indian Alaska Native Male (AIAN M) 2 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 3 African American Female (AA F) 11 Asian American Pacific Islander Male (AAPI M) 5 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 25 Hispanic Female (H F) 25 White Male (W M) 61 White

  15. YEAR

    National Nuclear Security Administration (NNSA)

    4 YEAR 2014 Males 7 Females 7 PAY PLAN YEAR 2014 SES 1 NQ (Prof/Tech/Admin) 7 GS 15 1 GS 14 2 GS 13 2 GS 10 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 3 African American Female (AA F) 2 Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 4 White Female (W F) 5 DIVERSITY TOTAL WORKFORCE GENDER

  16. YEAR

    National Nuclear Security Administration (NNSA)

    16 YEAR 2014 Males 72 Females 144 PAY PLAN YEAR 2014 SES 8 EJ/EK 1 NQ (Prof/Tech/Admin) 198 NU (Tech/Admin Support) 9 YEAR 2014 American Indian Alaska Native Male (AIAN M) 2 American Indian Alaskan Native Female (AIAN F) 2 African American Male (AA M) 10 African American Female (AA F) 38 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 3 Hispanic Male (H M) 15 Hispanic Female (H F) 33 White Male (W M) 44 White Female (W F) 68 DIVERSITY TOTAL

  17. YEAR

    National Nuclear Security Administration (NNSA)

    26 YEAR 2014 Males 81 Females 45 PAY PLAN YEAR 2014 SES 1 SL 1 EJ/EK 25 EN 04 26 EN 03 2 NN (Engineering) 23 NQ (Prof/Tech/Admin) 44 NU (Tech/Admin Support) 4 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 3 African American Female (AA F) 7 Asian American Pacific Islander Male (AAPI M) 4 Asian American Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 68 White

  18. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2014 Males 18 Females 10 PAY PLAN YEAR 2014 SES 1 EN 05 1 EN 04 4 NN (Engineering) 12 NQ (Prof/Tech/Admin) 9 NU (Tech/Admin Support) 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 4 African American Female (AA F) 4 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 13 White Female (W F) 5

  19. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2014 Males 18 Females 20 PAY PLAN YEAR 2014 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 28 NU (Tech/Admin Support) 2 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 1 African American Female (AA F) 1 Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 4 Hispanic Female (H F) 7 White Male (W M) 13 White Female (W F) 11

  20. YEAR

    National Nuclear Security Administration (NNSA)

    25 Females 10 YEAR 2014 SES 1 EN 04 11 NN (Engineering) 8 NQ (Prof/Tech/Admin) 13 NU (Tech/Admin Support) 2 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 1 African American Female (AA F) 3 Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 24 White Female (W F) 6 TOTAL WORKFORCE GENDER Kansas City

  1. YEAR

    National Nuclear Security Administration (NNSA)

    9 Females 24 PAY PLAN YEAR 2014 SES 1 EJ/EK 4 EN 05 3 EN 04 22 EN 03 8 NN (Engineering) 15 NQ (Prof/Tech/Admin) 27 NU (Tech/Admin Support) 3 YEAR 2014 American Indian Alaska Native Male (AIAN M) 2 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 5 African American Female (AA F) 2 Asian American Pacific Islander Male (AAPI M) 21 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 5 Hispanic Female (H F) 3 White Male (W M) 26 White Female (W F) 16

  2. YEAR

    National Nuclear Security Administration (NNSA)

    17 Females 18 PAY PLAN YEAR 2014 SES 1 EJ/EK 3 NQ (Prof/Tech/Admin) 30 NU (Tech/Admin Support) 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 1 American Indian Alaskan Native Female (AIAN F) 2 African American Male (AA M) 3 African American Female (AA F) 7 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 2 Hispanic Female (H F) 6 White Male (W M) 10 White Female (W F) 3 DIVERSITY TOTAL WORKFORCE GENDER Associate

  3. YEAR

    National Nuclear Security Administration (NNSA)

    8 Females 25 PAY PLAN YEAR 2014 SES 1 EJ/EK 3 EN 05 1 EN 04 25 EN 03 1 NN (Engineering) 25 NQ (Prof/Tech/Admin) 25 NU (Tech/Admin Support) 2 YEAR 2014 American Indian Alaska Native Male (AIAN M) 1 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 3 African American Female (AA F) 3 Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 46 White Female (W F) 13

  4. YEAR

    National Nuclear Security Administration (NNSA)

    -9.09% YEAR 2012 2013 SES 1 1 0.00% EN 05 1 1 0.00% EN 04 11 11 0.00% NN (Engineering) 8 8 0.00% NQ (ProfTechAdmin) 17 14 -17.65% NU (TechAdmin Support) 2 2...

  5. YEAR

    National Nuclear Security Administration (NNSA)

    Females 863 YEAR 2013 SES 102 EX 3 SL 1 EJEK 89 EN 05 41 EN 04 170 EN 03 18 NN (Engineering) 448 NQ (ProfTechAdmin) 1249 NU (TechAdmin Support) 76 NV (Nuc Mat Courier) 321...

  6. YEAR

    National Nuclear Security Administration (NNSA)

    Females 942 YEAR 2012 SES 108 EX 4 SL 1 EJEK 96 EN 05 45 EN 04 196 EN 03 20 NN (Engineering) 452 NQ (ProfTechAdmin) 1291 NU (TechAdmin Support) 106 NV (Nuc Mat Courier) 335...

  7. YEAR

    National Nuclear Security Administration (NNSA)

    YEAR 2012 2013 SES 2 1 -50.00% EN 05 0 1 100.00% EN 04 4 4 0.00% NN (Engineering) 13 12 -7.69% NQ (ProfTechAdmin) 13 9 -30.77% NU (TechAdmin Support) 1 1...

  8. Year

    U.S. Energy Information Administration (EIA) Indexed Site

    . U.S. Coal Production, 2009 - 2015 (thousand short tons) Year January - March April - June July - September October - December Total 2009 282,772 263,017 269,339 259,796 1,074,923 2010 265,702 264,982 277,505 276,180 1,084,368 2011 273,478 264,291 275,006 282,853 1,095,628 2012 266,865 241,047 258,956 249,591 1,016,458 2013 244,867 243,211 257,595 239,169 984,842 2014 245,271 245,844 255,377 253,557 1,000,049 2015 240,189 211,130 237,263 207,355 895,936 Note: Total may not equal sum of

  9. Area balance and strain in an extensional fault system: Strategies for improved oil recovery in fractured chalk, Gilbertown Field, southwestern Alabama -- Year 2. Annual report, March 1997--March 1998

    SciTech Connect (OSTI)

    Pashin, J.C.; Raymond, D.E.; Rindsberg, A.K.; Alabi, G.G.; Carroll, R.E.

    1998-09-01

    Gilbertown Field is the oldest oil field in Alabama and has produced oil from fractured chalk of the Cretaceous Selma Group and glauconitic sandstone of the Eutaw Formation. Nearly all of Gilbertown Field is still in primary recovery, although waterflooding has been attempted locally. The objective of this project is to analyze the geologic structure and burial history of Mesozoic and Tertiary strata in Gilbertown Field and adjacent areas in order to suggest ways in which oil recovery can be improved. Indeed, the decline of oil production to marginally economic levels in recent years has made this type of analysis timely and practical. Key technical advancements being sought include understanding the relationship of requisite strain to production in Gilbertown reservoirs, incorporation of synsedimentary growth factors into models of area balance, quantification of the relationship between requisite strain and bed curvature, determination of the timing of hydrocarbon generation, and identification of the avenues and mechanisms of fluid transport.

  10. Polarization-balanced beamsplitter

    DOE Patents [OSTI]

    Decker, Derek E.

    1998-01-01

    A beamsplitter assembly that includes several beamsplitter cubes arranged to define a plurality of polarization-balanced light paths. Each polarization-balanced light path contains one or more balanced pairs of light paths, where each balanced pair of light paths includes either two transmission light paths with orthogonal polarization effects or two reflection light paths with orthogonal polarization effects. The orthogonal pairing of said transmission and reflection light paths cancels polarization effects otherwise caused by beamsplitting.

  11. Polarization-balanced beamsplitter

    DOE Patents [OSTI]

    Decker, D.E.

    1998-02-17

    A beamsplitter assembly is disclosed that includes several beamsplitter cubes arranged to define a plurality of polarization-balanced light paths. Each polarization-balanced light path contains one or more balanced pairs of light paths, where each balanced pair of light paths includes either two transmission light paths with orthogonal polarization effects or two reflection light paths with orthogonal polarization effects. The orthogonal pairing of said transmission and reflection light paths cancels polarization effects otherwise caused by beamsplitting. 10 figs.

  12. Beyond Beginning Balances Presentation

    National Nuclear Security Administration (NNSA)

    Beyond Beginning Balances Peter Dessaules DOE/SO-62 Obligations Accounting Implementation Workshop Obligations Accounting Implementation Workshop January 13, 2004 January 13, 2004 Crowne Crowne Plaza Plaza Ravinia Ravinia Atlanta, Georgia Atlanta, Georgia Beginning Foreign Obligation Beginning Foreign Obligation Balances Balances * Why are they important? - United States Agreements for Cooperation hold Treaty status. - These Agreements require periodic reporting to the foreign countries. -

  13. Lithium Balance | Open Energy Information

    Open Energy Info (EERE)

    Balance Jump to: navigation, search Name: Lithium Balance Place: Copenhagen, Denmark Product: Lithium ion battery developer. References: Lithium Balance1 This article is a stub....

  14. Extreme Balance of System Hardware Cost Reduction

    Broader source: Energy.gov [DOE]

    On September 1, 2011, DOE announced $42.4 million in funding over three years for the Extreme Balance of System Hardware Cost Reduction (BOS-X) funding opportunity. Part of the SunShot Systems...

  15. Work/Life Balance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Workplace » Work/Life Balance /careers/_assets/images/careers-icon.jpg Work/Life Balance Explore the multiple dimensions of a career at Los Alamos Lab: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Complete suite of benefits to balance your career Enlarge poster enlarge Enlarge poster enlarge Enlarge poster enlarge Enlarge poster enlarge Enlarge poster enlarge Enlarge poster enlarge Enlarge poster enlarge

  16. Self Supplied Balancing Reserves

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Self-Supplied-Balancing-Reserves Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  17. Balancing coal pipes

    SciTech Connect (OSTI)

    Earley, D.; Kirkenir, B.

    2009-11-15

    Balancing coal flow to the burners to optimise combustion by using real-time measurement systems (such as microwave mass measurement) is discussed. 3 figs.

  18. Covenant Deferral Request for the Proposed Transfer of Land Parcel ED-8 at the East Tennessee Technology Park, Oak Ridge, Tennessee - Final - May 2009

    SciTech Connect (OSTI)

    SAIC

    2009-05-01

    The United States Department of Energy (DOE) is proposing to transfer a land parcel (hereinafter referred to as 'the Property') designated as Land Parcel ED-8 at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, by deed, and is submitting this Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and applicable U. S. Environmental Protection Agency (EPA) guidance. The Oak Ridge Reservation (ORR), which includes ETTP, was placed on the National Priorities List (NPL) in November 1989. Environmental investigation and cleanup activities are continuing at ETTP in accordance with CERCLA, the National Contingency Plan (NCP), and the Federal Facility Agreement (FFA). The FFA was entered into by the DOE-Oak Ridge Office (ORO), EPA Region 4, and the Tennessee Department of Environment and Conservation (TDEC) in 1991. The FFA establishes the schedule and milestones for environmental remediation of the ORR. The proposed property transfer is a key component of the Oak Ridge Performance Management Plan (ORPMP) for accelerated cleanup of the ORR. DOE, using its authority under Section 161(g) of the Atomic Energy Act of 1954 (AEA), proposes to transfer the Property to Heritage Center, LLC, a subsidiary of the Community Reuse Organization of East Tennessee (CROET), hereafter referred to as 'Heritage Center.' CROET is a 501(c)(3) not-for-profit corporation established to foster the diversification of the regional economy by re-utilizing DOE property for private-sector investment and job creation. The Property is located in the southern portion of ETTP and consists of approximately 84 acres proposed as the potential site for new facilities to be used for office space, industrial activities, or other commercial uses. The parcel contains both grassy fields located outside the ETTP 'main plant' area and infrastructure located inside the 'main plant' area. No buildings are included in the proposed ED-8 transfer. The buildings in ED-8 have already been transferred (Buildings K-1007, K-1580, K-1330, and K-1000). These buildings are not included in the transfer footprint of Land Parcel ED-8. A number of temporary structures, such as trailers and tents (non-real property), are located within the footprint. These temporary structures are not included in the transfer. DOE would continue to be responsible for any contamination resulting from DOE activities that is present on the property at the time of transfer but found after the date of transfer. The deed transferring the Property contains various restrictions and prohibitions on the use of the Property that are subject to enforcement pursuant to State Law Tennessee Code Annotated (T.C.A.) 68-212-225 and state real property law. These restrictions and prohibitions are designed to ensure protection of human health and the environment.

  19. Balancing Item (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) Indexed Site

    Balancing Item (Billion Cubic Feet) Balancing Item (Billion Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2001 140 143 41 166 30 -13 -8 -6 -26 -133 -76 -161 2002 -4 38 11 164 28 95 54 49 8 -124 -126 -129 2003 -86 76 118 43 30 16 80 57 12 -49 -136 -118 2004 -66 134 126 133 116 71 58 60 63 -13 -79 -142 2005 -41 104 14 131 60 58 62 66 59 -37 -114 -127 2006 49 -2 80 152 53 41 34 51 -2 -99 -101 -153 2007 -128 55 118 42 63 34 3 24 -3 -52 -185 -175 2008 -75 54 59 105 38 42 23 29 16

  20. Annual Uncosted Balances Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Uncosted Balances Reports Annual Uncosted Balances Reports Section 2307 of the Energy Policy Act of 1992 (42 U.S.C. 13526) requires the Department of Energy (Department or DOE) to submit an annual report to Congress on the state of the Department's uncosted obligations. The section requires the report to identify the uncosted obligations at the end of the previous fiscal year (FY), describe the purpose of those funds, and describe the effect the information had on the annual budget

  1. Balance Energy | Open Energy Information

    Open Energy Info (EERE)

    Balance Energy Jump to: navigation, search Name: Balance Energy Place: San Diego, California Zip: 92127-1874 Product: California-based end to end smart grid developer. References:...

  2. Multidimensional spectral load balancing

    SciTech Connect (OSTI)

    Hendrickson, B.; Leland, R.

    1993-01-01

    We describe an algorithm for the static load balancing of scientific computations that generalizes and improves upon spectral bisection. Through a novel use of multiple eigenvectors, our new spectral algorithm can divide a computation into 4 or 8 pieces at once. These multidimensional spectral partitioning algorithms generate balanced partitions that have lower communication overhead and are less expensive to compute than those produced by spectral bisection. In addition, they automatically work to minimize message contention on a hypercube or mesh architecture. These spectral partitions are further improved by a multidimensional generalization of the Kernighan-Lin graph partitioning algorithm. Results on several computational grids are given and compared with other popular methods.

  3. Multidimensional spectral load balancing

    DOE Patents [OSTI]

    Hendrickson, Bruce A.; Leland, Robert W.

    1996-12-24

    A method of and apparatus for graph partitioning involving the use of a plurality of eigenvectors of the Laplacian matrix of the graph of the problem for which load balancing is desired. The invention is particularly useful for optimizing parallel computer processing of a problem and for minimizing total pathway lengths of integrated circuits in the design stage.

  4. Trends and balances: 1985-1990

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    This is the seventh edition of Trends and Balances to be presented to the staff of Oak Ridge National (ORNL) and other interested parties. Each year at the end of the planning cycle the Laboratory publishes its official planning document, the Institutional Plan. Trends and Balances is brought out as a condensation of that more formal document and is intended to provide a reference to the kinds of plans that have occupied senior laboratory management over the past year. An institution as large as ORNL changes slowly, so some of the information in this document overlaps that contained in the previous edition of Trends and Balances. Much, however, is different. A new section, for example, describes what senior Laboratory management feels are five new directions for science and technology at ORNL. This document is intended to provide new insights into the programs and structure of the Laboratory.

  5. ARM - Measurement - Surface energy balance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy balance ARM Data Discovery Browse Data Comments? We would love to hear from you Send us a note below or call us at 1-888-ARM-DATA. Send Measurement : Surface energy balance...

  6. Co2balance | Open Energy Information

    Open Energy Info (EERE)

    balance Jump to: navigation, search Name: Co2balance Place: United Kingdom Sector: Carbon Product: Carbon offset provider based in Somerset, UK. References: Co2balance1 This...

  7. Dynamic load balancing of applications

    DOE Patents [OSTI]

    Wheat, Stephen R.

    1997-01-01

    An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated.

  8. Dynamic load balancing of applications

    DOE Patents [OSTI]

    Wheat, S.R.

    1997-05-13

    An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers is disclosed. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated. 13 figs.

  9. Radar channel balancing with commutation

    SciTech Connect (OSTI)

    Doerry, Armin Walter

    2014-02-01

    When multiple channels are employed in a pulse-Doppler radar, achieving and maintaining balance between the channels is problematic. In some circumstances the channels may be commutated to achieve adequate balance. Commutation is the switching, trading, toggling, or multiplexing of the channels between signal paths. Commutation allows modulating the imbalance energy away from the balanced energy in Doppler, where it can be mitigated with filtering.

  10. U.S. Natural Gas Balancing Item (Million Cubic Feet)

    U.S. Energy Information Administration (EIA) Indexed Site

    Balancing Item (Million Cubic Feet) U.S. Natural Gas Balancing Item (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 634,809 -111,218 2000's -240,342 134,346 -13,339 -38,495 356,956 134,293 61,404 -196,323 33,472 -89,392 2010's 124,358 -130,108 -123,053 -15,729 -44,437 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 4/29/2016 Next Release Date:

  11. Good Year - Bad Year Financial Planning Workshop handout - April...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    unit's financial reserve balance at the end of a year or be used as an input for a TPP assessment. This metric is the most direct measure of BPA's ability to pay Treasury....

  12. The United States Plutonium Balance, 1944 - 2009

    National Nuclear Security Administration (NNSA)

    Rocky Flats Site 1995 Rocky Flats Site 2005 Rocky Flats Site 1995 The United States Plutonium Balance, 1944 - 2009 An update of Plutonium: The First 50 Years, DOE/DP-0137, February 1996 June 2012 ii Preface This report updates Plutonium: The first 50 years which was released by the U.S. Department of Energy (DOE) in 1996. The topic of both reports is plutonium, sometimes referred to as Pu-239, which is capable of sustaining a nuclear chain reaction and is used in nuclear weapons and for nuclear

  13. Libra: Scalable Load Balance Analysis

    Energy Science and Technology Software Center (OSTI)

    2009-09-16

    Libra is a tool for scalable analysis of load balance data from all processes in a parallel application. Libra contains an instrumentation module that collects model data from parallel applications and a parallel compression mechanism that uses distributed wavelet transforms to gather load balance model data in a scalable fashion. Data is output to files, and these files can be viewed in a GUI tool by Libra users. The GUI tool associates particular load balancemore » data with regions for code, emabling users to view the load balance properties of distributed "slices" of their application code.« less

  14. Mechanically balanced tapered plug valve

    DOE Patents [OSTI]

    Anaya, Jose R.

    1985-01-01

    The invention is a novel hermetic tapered plug valve having a spring-like resilient mechanism for providing axial balance to the plug and thereby prevent valve lock up.

  15. Material Balance Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Material Balance Report Material Balance Report Form supports nuclear material control and accountability. PDF icon Material Balance Report More Documents & Publications DOE/NRC F 742 PHYSICAL INVENTORY LISTING DOE/NRC F 740M

  16. Voltage balanced multilevel voltage source converter system ...

    Office of Scientific and Technical Information (OSTI)

    Voltage balanced multilevel voltage source converter system Citation Details In-Document Search Title: Voltage balanced multilevel voltage source converter system You are ...

  17. Voltage balanced multilevel voltage source converter system ...

    Office of Scientific and Technical Information (OSTI)

    Voltage balanced multilevel voltage source converter system Citation Details In-Document Search Title: Voltage balanced multilevel voltage source converter system A voltage ...

  18. Current balancing for battery strings

    DOE Patents [OSTI]

    Galloway, James H.

    1985-01-01

    A battery plant is described which features magnetic circuit means for balancing the electrical current flow through a pluraliircuitbattery strings which are connected electrically in parallel. The magnetic circuit means is associated with the battery strings such that the conductors carrying the electrical current flow through each of the battery strings pass through the magnetic circuit means in directions which cause the electromagnetic fields of at least one predetermined pair of the conductors to oppose each other. In an alternative embodiment, a low voltage converter is associated with each of the battery strings for balancing the electrical current flow through the battery strings.

  19. Alternative Fuels Data Center: Lifecycle Energy Balance

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    AFDC Printable Version Share this resource Send a link to Alternative Fuels Data Center: Lifecycle Energy Balance to someone by E-mail Share Alternative Fuels Data Center: Lifecycle Energy Balance on Facebook Tweet about Alternative Fuels Data Center: Lifecycle Energy Balance on Twitter Bookmark Alternative Fuels Data Center: Lifecycle Energy Balance on Google Bookmark Alternative Fuels Data Center: Lifecycle Energy Balance on Delicious Rank Alternative Fuels Data Center: Lifecycle Energy

  20. Burner balancing Salem Harbor Station

    SciTech Connect (OSTI)

    Sload, A.W.; Dube, R.J.

    1995-12-31

    The traditional method of burner balancing is first to determine the fuel distribution, then to measure the economizer outlet excess oxygen distribution and to adjust the burners accordingly. Fuel distribution is typically measured by clean and dirty air probing. Coal pipe flow can then be adjusted, if necessary, through the use of coal pipe orificing or by other means. Primary air flow must be adjusted to meet the design criteria of the burner. Once coal pipe flow is balanced to within the desired criteria, secondary air flow to individual burners can be changed by adjusting windbox dampers, burner registers, shrouds or other devices in the secondary air stream. This paper discusses problems encountered in measuring excess O{sub 2} at the economizer outlet. It is important to recognize that O{sub 2} measurements at the economizer outlet, by themselves, can be very misleading. If measurement problems are suspected or encountered, an alternate approach similar to that described should be considered. The alternate method is not only useful for burner balancing but also can be used to help in calibrating the plant excess O{sub 2} instruments and provide an on line means of cross-checking excess air measurements. Balanced burners operate closer to their design stoichiometry, providing better NO{sub x} reduction. For Salem Harbor Station, this means a significant saving in urea consumption.

  1. Dual shell pressure balanced vessel

    DOE Patents [OSTI]

    Fassbender, Alexander G.

    1992-01-01

    A dual-wall pressure balanced vessel for processing high viscosity slurries at high temperatures and pressures having an outer pressure vessel and an inner vessel with an annular space between the vessels pressurized at a pressure slightly less than or equivalent to the pressure within the inner vessel.

  2. Balanced pressure gerotor fuel pump

    DOE Patents [OSTI]

    Raney, Michael Raymond; Maier, Eugen

    2004-08-03

    A gerotor pump for pressurizing gasoline fuel is capable of developing pressures up to 2.0 MPa with good mechanical and volumetric efficiency and satisfying the durability requirements for an automotive fuel pump. The pump has been designed with optimized clearances and by including features that promote the formation of lubricating films of pressurized fuel. Features of the improved pump include the use of a shadow port in the side plate opposite the outlet port to promote balancing of high fuel pressures on the opposite sides of the rotors. Inner and outer rotors have predetermined side clearances with the clearances of the outer rotor being greater than those of the inner rotor in order to promote fuel pressure balance on the sides of the outer rotor. Support of the inner rotor and a drive shaft on a single bushing with bearing sleeves maintains concentricity. Additional features are disclosed.

  3. Western Hemisphere Oil Products Balance

    U.S. Energy Information Administration (EIA) Indexed Site

    Western Hemisphere Oil Products Balance Ramón Espinasa, Ph.D. / Lead Specialist July 2014 The Energy Innovation Center Energy Division 3 The views expressed by the author do not reflect the views of the Inter- American Development Bank, its Management, its Board of Executive Directors or its member Governments. DISCLAIMER www.iadb.org Copyright © 2014 Interamerican Development Bank. All rights reserved; This document may be freely reproduced for non-commercial purposes. 4 United States Oil

  4. FY 2006 Laboratory Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Tables Preliminary Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO February 2005 Laboratory Tables Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals,

  5. FY 2006 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Tables Preliminary Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO February 2005 State Tables Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or

  6. FY 2007 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    state tables preliminary Department of Energy FY 2007 Congressional Budget Request February 2006 Printed with soy ink on recycled paper Office of Chief Financial Officer state tables preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other

  7. FY 2008 Laboratory Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Table Preliminary Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Laboratory Table Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other

  8. FY 2008 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Table Preliminary Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer State Table Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other adjustments

  9. FY 2009 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Tables Preliminary February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request State Tables Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE

  10. FY 2010 Laboratory Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Tables Preliminary May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Laboratory Tables Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by

  11. FY 2010 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Tables Preliminary May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request State Tables Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the

  12. FY 2011 Laboratory Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Tables Department of Energy FY 2011 Congressional Budget Request DOE/CF-0055 March 2010 Office of Chief Financial Officer Laboratory Tables Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments

  13. FY 2011 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Tables Department of Energy FY 2011 Congressional Budget Request DOE/CF-0054 March 2010 Office of Chief Financial Officer State Tables Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated

  14. https://pals.doe.gov/rptserver.asp

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Tables Preliminary Department of Energy FY 2015 Congressional Budget Request DOE/CF-0104 March 2014 Office of Chief Financial Officer State Tables Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other

  15. https://pals.doe.gov/rptserver.asp

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Tables Preliminary Department of Energy FY 2016 Congressional Budget Request DOE/CF-0114 February 2015 Office of Chief Financial Officer Laboratory Tables Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals,

  16. https://pals.doe.gov/rptserver.asp

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Tables Preliminary Department of Energy FY 2016 Congressional Budget Request DOE/CF-0115 February 2015 Office of Chief Financial Officer State Tables Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other

  17. rptserver.asp

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Tables Preliminary Department of Energy FY 2015 Congressional Budget Request DOE/CF-0103 March 2014 Office of Chief Financial Officer Laboratory Tables Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions,

  18. February 2016 Office of Chief Financial Officer Laboratory Tables

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Tables Preliminary Department of Energy FY 2017 Congressional Budget Request DOE/CF-0126 February 2016 Office of Chief Financial Officer Laboratory Tables Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals,

  19. February 2016 Office of Chief Financial Officer State Tables

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Tables Preliminary Department of Energy FY 2017 Congressional Budget Request DOE/CF-0127 February 2016 Office of Chief Financial Officer State Tables Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other

  20. Balancing oil and environment... responsibly.

    SciTech Connect (OSTI)

    Weimer, Walter C.; Teske, Lisa

    2007-01-25

    Balancing Oil and Environment…Responsibly As the price of oil continues to skyrocket and global oil production nears the brink, pursuing unconventional oil supplies, such as oil shale, oil sands, heavy oils, and oils from biomass and coal has become increasingly attractive. Of particular significance to the American way is that our continent has significant quantities of these resources. Tapping into these new resources, however, requires cutting-edge technologies for identification, production, processing and environmental management. This job needs a super hero or two for a job of this size and proportion…

  1. The United States Plutonium Balance, 1944-2009 | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Pits The United States Plutonium Balance, 1944-2009 The United States Plutonium Balance, 1944-2009 The United States has released an inventory of its plutonium balances...

  2. Device for balancing parallel strings

    DOE Patents [OSTI]

    Mashikian, Matthew S.

    1985-01-01

    A battery plant is described which features magnetic circuit means in association with each of the battery strings in the battery plant for balancing the electrical current flow through the battery strings by equalizing the voltage across each of the battery strings. Each of the magnetic circuit means generally comprises means for sensing the electrical current flow through one of the battery strings, and a saturable reactor having a main winding connected electrically in series with the battery string, a bias winding connected to a source of alternating current and a control winding connected to a variable source of direct current controlled by the sensing means. Each of the battery strings is formed by a plurality of batteries connected electrically in series, and these battery strings are connected electrically in parallel across common bus conductors.

  3. Balancing radar receiver channels with commutation. (Conference...

    Office of Scientific and Technical Information (OSTI)

    Title: Balancing radar receiver channels with commutation. Abstract not provided. Authors: Doerry, Armin Walter Publication Date: 2015-01-01 OSTI Identifier: 1244859 Report ...

  4. EIA-930 Hourly and Daily Balancing ...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... file retrieval using business-to-business data transfer or web services technology. ... but are to be included in the posted hourly value for balancing authority net generation. ...

  5. Work and Life Balance | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home > Impact > Flex Ability: Balancing Work with Life Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) Flex Ability: Balancing Work with Life Achieving work/life balance is a much-talked-about topic. According to GE Healthcare's Kelly Piacsek, "GE hires people for what's inside their head-what they know-and

  6. Surface Energy Balance System (SEBS) Handbook

    SciTech Connect (OSTI)

    Cook, DR

    2011-02-14

    A Surface Energy Balance System (SEBS) has been installed collocated with each deployed ECOR system at the Southern Great Plains (SGP), North Slope of Alaska (NSA), Tropical Western Pacific (TWP), ARM Mobile Facility 1 (AMF1), and ARM Mobile Facility 2 (AMF2). The surface energy balance system consists of upwelling and downwelling solar and infrared radiometers within one net radiometer, a wetness sensor, and soil measurements. The SEBS measurements allow the comparison of ECOR sensible and latent heat fluxes with the energy balance determined from the SEBS and provide information on wetting of the sensors for data quality purposes.

  7. Y YEAR

    National Nuclear Security Administration (NNSA)

    2 40 -4.76% YEAR 2013 2014 Males 37 35 -5.41% Females 5 5 0% YEAR 2013 2014 SES 2 2 0% EJEK 5 4 -20.00% EN 05 5 7 40.00% EN 04 6 6 0% EN 03 1 1 0% NN...

  8. Y YEAR

    National Nuclear Security Administration (NNSA)

    79 67 -15.19% YEAR 2013 2014 Males 44 34 -22.73% Females 35 33 -5.71% YEAR 2013 2014 SES 6 4 -33.33% EJEK 1 1 0% EN 05 9 8 -11.11% EN 04 6 5 -16.67% NN...

  9. Balance Calibration A Method for Assigning a Direct-Reading Uncertainty to an Electronic Balance.

    SciTech Connect (OSTI)

    Mike Stears

    2010-07-01

    Paper Title: Balance Calibration A method for assigning a direct-reading uncertainty to an electronic balance. Intended Audience: Those who calibrate or use electronic balances. Abstract: As a calibration facility, we provide on-site (at the customers location) calibrations of electronic balances for customers within our company. In our experience, most of our customers are not using their balance as a comparator, but simply putting an unknown quantity on the balance and reading the displayed mass value. Manufacturers specifications for balances typically include specifications such as readability, repeatability, linearity, and sensitivity temperature drift, but what does this all mean when the balance user simply reads the displayed mass value and accepts the reading as the true value? This paper discusses a method for assigning a direct-reading uncertainty to a balance based upon the observed calibration data and the environment where the balance is being used. The method requires input from the customer regarding the environment where the balance is used and encourages discussion with the customer regarding sources of uncertainty and possible means for improvement; the calibration process becomes an educational opportunity for the balance user as well as calibration personnel. This paper will cover the uncertainty analysis applied to the calibration weights used for the field calibration of balances; the uncertainty is calculated over the range of environmental conditions typically encountered in the field and the resulting range of air density. The temperature stability in the area of the balance is discussed with the customer and the temperature range over which the balance calibration is valid is decided upon; the decision is based upon the uncertainty needs of the customer and the desired rigor in monitoring by the customer. Once the environmental limitations are decided, the calibration is performed and the measurement data is entered into a custom spreadsheet. The spreadsheet uses measurement results, along with the manufacturers specifications, to assign a direct-read measurement uncertainty to the balance. The fact that the assigned uncertainty is a best-case uncertainty is discussed with the customer; the assigned uncertainty contains no allowance for contributions associated with the unknown weighing sample, such as density, static charges, magnetism, etc. The attendee will learn uncertainty considerations associated with balance calibrations along with one method for assigning an uncertainty to a balance used for non-comparison measurements.

  10. Background-free balanced optical cross correlator

    DOE Patents [OSTI]

    Nejadmalayeri, Amir Hossein; Kaertner, Franz X

    2014-12-23

    A balanced optical cross correlator includes an optical waveguide, a first photodiode including a first n-type semiconductor and a first p-type semiconductor positioned about the optical waveguide on a first side of the optical waveguide's point of symmetry, and a second photodiode including a second n-type semiconductor and a second p-type semiconductor positioned about the optical waveguide on a second side of the optical waveguide's point of symmetry. A balanced receiver including first and second inputs is configured to produce an output current or voltage that reflects a difference in currents or voltages, originating from the first and the second photodiodes of the balanced cross correlator and fed to the first input and to the second input of the balanced receiver.

  11. Balanced Scorecard Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Balanced Scorecard Program Balanced Scorecard Program I. Introduction The BSC is a conceptual framework for translating an organization's vision into a set of performance indicators distributed among four perspectives: Financial, Customer, Internal Business Processes, and Learning and Growth. Indicators are maintained to measure an organization's progress toward achieving its vision; other indicators are maintained to measure the long term drivers of success. Through the BSC, an organization

  12. FY 2011 Annual Uncosted Balances Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Uncosted Balances Reports » FY 2011 Annual Uncosted Balances Report FY 2011 Annual Uncosted Balances Report This report represents an analysis of the Department's uncosted balances for FY 2011. In FY 2009, the American Recovery and Reinvestment Act of 2009 (Recovery Act) provided the Department an additional $36.7 billion of funding. The FY 2011 uncosted balances associated with Recovery Act funding are separately presented but are not included in the additional analysis of uncosted balances in

  13. Microsoft Word - Energy balancing rate settlement signals commitment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    defines charges for balancing services, or generation inputs, that maintain a constant balance of the energy produced and energy consumed. "BPA and the parties involved in this...

  14. Acquisition Guide Chapter 1.2 - Balanced Scorecard Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 - Balanced Scorecard Performance Assessment Program - (March 2004) Acquisition Guide Chapter 1.2 - Balanced Scorecard Performance Assessment Program - (March 2004) This chapter ...

  15. IN OTHER CATEGORIES; MACHINERY; MASS BALANCE; MECHANICAL VIBRATIONS...

    Office of Scientific and Technical Information (OSTI)

    world Bracher, B. 42 ENGINEERING NOT INCLUDED IN OTHER CATEGORIES; MACHINERY; MASS BALANCE; MECHANICAL VIBRATIONS; MAINTENANCE; REPAIR Field balancing can achieve significant...

  16. Smart Meters Help Balance Energy Consumption at Solar Decathlon...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Smart Meters Help Balance Energy Consumption at Solar Decathlon Smart Meters Help Balance Energy Consumption at Solar Decathlon September 28, 2011 - 10:57am Addthis The Team...

  17. Y YEAR

    National Nuclear Security Administration (NNSA)

    7 35 -5.41% ↓ YEAR 2013 2014 Males 27 25 -7.41% ↓ Females 10 10 0% / YEAR 2013 2014 SES 1 1 0% / EN 05 1 1 0% / EN 04 11 10 -9.09% ↓ NN (Engineering) 8 8 0% / NQ (Prof/Tech/Admin) 14 15 7.14% ↑ NU (Tech/Admin Support) 2 0 -100% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 1 1 0% / African American Female (AA,F) 3 3 0% / Asian American Pacific Islander Male (AAPI,M) 0 0 0% /

  18. Y YEAR

    National Nuclear Security Administration (NNSA)

    5 79 -7.06% ↓ YEAR 2013 2014 Males 59 57 -3.39% ↓ Females 26 22 -15.38% ↓ YEAR 2013 2014 SES 1 0 -100% ↓ EJ/EK 4 3 -25.00% ↓ EN 05 3 2 -33.33% ↓ EN 04 22 22 0% / EN 03 8 8 0% / NN (Engineering) 16 15 -6.25% ↓ NQ (Prof/Tech/Admin) 28 26 -7.14% ↓ NU (Tech/Admin Support) 3 3 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 2 2 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 5 4 -20.00% ↓ African American Female (AA,F) 3 2

  19. Y YEAR

    National Nuclear Security Administration (NNSA)

    91 81 -10.99% ↓ YEAR 2013 2014 Males 67 56 -16.42% ↓ Females 24 25 4.17% ↑ YEAR 2013 2014 SES 1 2 100% ↑ EJ/EK 9 8 -11.11% ↓ EN 04 25 22 -12.00% ↓ NN (Engineering) 24 20 -16.67% ↓ NQ (Prof/Tech/Admin) 29 26 -10.34% ↓ NU (Tech/Admin Support) 3 3 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 2 2 0% / American Indian Alaskan Native Female (AIAN,F) 3 3 0% / African American Male (AA,M) 0 0 0% / African American Female (AA,F) 0 0 0% / Asian American Pacific Islander

  20. Y YEAR

    National Nuclear Security Administration (NNSA)

    21 -4.55% ↓ YEAR 2013 2014 Males 10 8 -20.00% ↓ Females 12 13 8.33% ↑ YEAR 2013 2014 SES 10 7 -30.00% ↓ EX 0 2 100% ↑ EJ/EK 1 1 0% / EN 05 0 1 100% ↑ EN 04 0 1 100% ↑ NQ (Prof/Tech/Admin) 9 8 -11.11% ↓ NU (Tech/Admin Support) 1 1 0% / ED 00 1 0 -100% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 2 1 -50.00% ↓ African American Male (AA,M) 1 1 0% / African American Female (AA,F) 5 4 -20.00% ↓ Asian

  1. Y YEAR

    National Nuclear Security Administration (NNSA)

    41 155 9.93% ↑ YEAR 2013 2014 Males 92 106 15.22% ↑ Females 49 49 0% / YEAR 2013 2014 SES 8 8 0% / EX 1 1 0% / EJ/EK 4 4 0% / EN 05 11 10 -9.09% ↓ EN 04 11 14 27.27% ↑ EN 03 2 5 150% ↑ NN (Engineering) 60 63 5.00% ↑ NQ (Prof/Tech/Admin) 44 50 13.64% ↑ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 1 1 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 7 10 42.86% ↑ African American Female (AA,F) 13 11 -15.38% ↓ Asian American

  2. Y YEAR

    National Nuclear Security Administration (NNSA)

    563 560 -0.53% ↓ YEAR 2013 2014 Males 518 514 -0.77% ↓ Females 45 46 2.22% ↑ YEAR 2013 2014 SES 2 2 0% / EJ/EK 2 2 0% / EN 04 1 1 0% / NN (Engineering) 11 11 0% / NQ (Prof/Tech/Admin) 218 221 1.38% ↑ NU (Tech/Admin Support) 1 2 100% ↑ NV (Nuc Mat Courier) 328 321 -2.13% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 15 15 0% / American Indian Alaskan Native Female (AIAN,F) 2 2 0% / African American Male (AA,M) 19 18 -5.26% ↓ African American Female (AA,F) 1 1 0% /

  3. Y YEAR

    National Nuclear Security Administration (NNSA)

    97 180 -8.63% ↓ YEAR 2013 2014 Males 105 89 -15.24% ↓ Females 92 91 -1.09% ↓ YEAR 2013 2014 SES 14 13 -7.14% ↓ EX 1 1 0% / EJ/EK 3 3 0% / EN 05 1 1 0% / EN 04 4 2 -50.00% ↓ EN 03 1 1 0% / EN 00 0 3 100% ↑ NN (Engineering) 35 27 -22.86% ↓ NQ (Prof/Tech/Admin) 135 126 -6.67% ↓ NU (Tech/Admin Support) 2 2 0% / GS 15 0 1 100% ↑ GS 13 1 0 -100% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 2 1 -50.00% ↓ American Indian Alaskan Native Female (AIAN,F) 0 0 0% /

  4. Y YEAR

    National Nuclear Security Administration (NNSA)

    *Total number of Employees 122 112 -8.20% ↓ YEAR 2013 2014 Males 90 84 -6.67% ↓ Females 32 28 -12.50% ↓ YEAR 2013 2014 SES 26 24 -7.69% ↓ EJ/EK 3 3 0% / EN 05 8 9 12.50% ↑ NN (Engineering) 48 47 -2.08% ↓ NQ (Prof/Tech/Admin) 30 26 -13.33% ↓ NU (Tech/Admin Support) 7 3 -57.14% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 3 3 0% / African American Female (AA,F) 7 6 -14.29%

  5. Y YEAR

    National Nuclear Security Administration (NNSA)

    4 79 -5.95% ↓ YEAR 2013 2014 Males 59 55 -6.78% ↓ Females 25 24 -4.00% ↓ YEAR 2013 2014 SES 3 3 0% / EJ/EK 4 4 0% / EN 04 2 1 -50.00% ↓ NN (Engineering) 20 20 0% / NQ (Prof/Tech/Admin) 55 51 -7.27% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 0 0 0% / African American Male (AA,M) 10 10 0% / African American Female (AA,F) 9 8 -11.11% ↓ Asian American Pacific Islander Male (AAPI,M) 2 2 0% / Asian American Pacific

  6. Y YEAR

    National Nuclear Security Administration (NNSA)

    8 87 -1.14% ↓ YEAR 2013 2014 Males 46 46 0% / Females 42 41 -2.38% ↓ YEAR 2013 2014 SES 1 0 -100% ↓ EJ/EK 4 2 -50.00% ↓ NN (Engineering) 12 12 0% / NQ (Prof/Tech/Admin) 68 70 2.94% ↑ NU (Tech/Admin Support) 3 3 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 2 2 0% / African American Male (AA,M) 5 5 0% / African American Female (AA,F) 5 6 20.00% ↑ Asian American Pacific Islander Male (AAPI,M) 0 0 0% / Asian

  7. Y YEAR

    National Nuclear Security Administration (NNSA)

    1 14 27.27% ↑ YEAR 2013 2014 Males 9 12 33.33% ↑ Females 2 2 0% / YEAR 2013 2014 SES 2 2 0% / EJ/EK 1 1 0% / EN 04 0 1 100% ↑ EN 00 0 1 100% ↑ NN (Engineering) 5 5 0% / NQ (Prof/Tech/Admin) 3 4 33.33% ↑ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 0 0 0% / African American Male (AA,M) 0 0 0% / African American Female (AA,F) 0 0 0% / Asian American Pacific Islander Male (AAPI,M) 1 1 0% / Asian American Pacific

  8. Y YEAR

    National Nuclear Security Administration (NNSA)

    79 164 -8.38% ↓ YEAR 2013 2014 Males 100 92 -8.00% ↓ Females 79 72 -8.86% ↓ YEAR 2013 2014 SES 8 8 0% / EJ/EK 4 3 -25.00% ↓ EN 04 11 11 0% / EN 03 1 1 0% / EN 00 0 2 100% ↑ NN (Engineering) 39 32 -17.95% ↓ NQ (Prof/Tech/Admin) 111 104 -6.31% ↓ NU (Tech/Admin Support) 5 3 -40.00% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 1 2 100% ↑ American Indian Alaskan Native Female (AIAN,F) 2 1 -50.00% ↓ African American Male (AA,M) 4 3 -25.00% ↓ African American

  9. Y YEAR

    National Nuclear Security Administration (NNSA)

    40 36 -10.00% ↓ YEAR 2013 2014 Males 18 18 0% / Females 22 18 -18.18% ↓ YEAR 2013 2014 SES 3 2 -33.33% ↓ EJ/EK 1 1 0% / EN 03 1 1 0% / NN (Engineering) 3 3 0% / NQ (Prof/Tech/Admin) 30 27 -10.00% ↓ NU (Tech/Admin Support) 2 2 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 0 0 0% / African American Male (AA,M) 1 1 0% / African American Female (AA,F) 1 1 0% / Asian American Pacific Islander Male (AAPI,M) 0 0 0% /

  10. Y YEAR

    National Nuclear Security Administration (NNSA)

    4 30 -11.76% ↓ YEAR 2013 2014 Males 16 14 -12.50% ↓ Females 18 16 -11.11% ↓ YEAR 2013 2014 SES 1 1 0% / EJ/EK 3 1 -66.67% ↓ NQ (Prof/Tech/Admin) 29 27 -6.90% ↓ NU (Tech/Admin Support) 1 1 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 1 1 0% / American Indian Alaskan Native Female (AIAN,F) 2 2 0% / African American Male (AA,M) 3 3 0% / African American Female (AA,F) 7 6 -14.29% ↓ Asian American Pacific Islander Male (AAPI,M) 1 1 0% / Asian American Pacific Islander

  11. Y YEAR

    National Nuclear Security Administration (NNSA)

    9 209 -8.73% ↓ YEAR 2013 2014 Males 76 76 0% / Females 153 133 -13.07% ↓ YEAR 2013 2014 SES 9 6 -33.33% ↓ EJ/EK 1 1 0% / NQ (Prof/Tech/Admin) 208 194 -6.73% ↓ NU (Tech/Admin Support) 11 8 -27.27% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 2 2 0% / American Indian Alaskan Native Female (AIAN,F) 3 2 -33.33% ↓ African American Male (AA,M) 10 10 0% / African American Female (AA,F) 39 36 -7.69% ↓ Asian American Pacific Islander Male (AAPI,M) 1 1 0% / Asian American

  12. Y YEAR

    National Nuclear Security Administration (NNSA)

    7 80 -8.05% ↓ YEAR 2013 2014 Males 62 57 -8.06% ↓ Females 25 23 -8.00% ↓ YEAR 2013 2014 SES 1 1 0% / EJ/EK 3 3 0% / EN 05 1 1 0% / EN 04 27 24 -11.11% ↓ EN 03 1 0 -100% ↓ NN (Engineering) 26 25 -3.85% ↓ NQ (Prof/Tech/Admin) 26 24 -7.69% ↓ NU (Tech/Admin Support) 2 2 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 1 1 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 3 2 -33.33% ↓ African American Female (AA,F) 3 3 0% / Asian

  13. Y YEAR

    National Nuclear Security Administration (NNSA)

    8 27 -3.57% ↓ YEAR 2013 2014 Males 18 17 -5.56% ↓ Females 10 10 0% / YEAR 2013 2014 SES 1 1 0% / EN 05 1 1 0% / EN 04 4 3 -25.00% ↓ NN (Engineering) 12 12 0% / NQ (Prof/Tech/Admin) 9 9 0% / NU (Tech/Admin Support) 1 1 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 4 4 0% / African American Female (AA,F) 3 4 33.33% ↑ Asian American Pacific Islander Male (AAPI,M) 1 1 0% / Asian

  14. Arid site water balance: evapotranspiration modeling and measurements

    SciTech Connect (OSTI)

    Gee, G.W.; Kirkham, R.R.

    1984-09-01

    In order to evaluate the magnitude of radionuclide transport at an aird site, a field and modeling study was conducted to measure and predict water movement under vegetated and bare soil conditions. Significant quantities of water were found to move below the roo of a shallow-rooted grass-covered area during wet years at the Hanford site. The unsaturated water flow model, UNSAT-1D, was resonably successful in simulating the transient behavior of the water balance at this site. The effects of layered soils on water balance were demonstrated using the model. Models used to evaluate water balance in arid regions should not rely on annual averages and assume that all precipitation is removed by evapotranspiration. The potential for drainage at arid sites exists under conditions where shallow rooted plants grow on coarse textured soils. This condition was observed at our study site at Hanford. Neutron probe data collected on a cheatgrass community at the Hanford site during a wet year indicated that over 5 cm of water drained below the 3.5-m depth. The unsaturated water flow model, UNSAT-1D, predicted water drainage of about 5 cm (single layer, 10 months) and 3.5 cm (two layers, 12 months) for the same time period. Additional field measurements of hydraulic conductivity will likely improve the drainage estimate made by UNSAT-1D. Additional information describing cheatgrass growth and water use at the grass site could improve model predictions of sink terms and subsequent calculations of water storage within the rooting zone. In arid areas where the major part of the annual precipitation occurs during months with low average potential evapotranspiration and where soils are vegetated but are coarse textured and well drained, significant drainage can occur. 31 references, 18 figures, 1 table.

  15. Work-Life Balance | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work-Life Balance Balancing work and life means prioritizing what is important to you. Argonne supports employees who want to coordinate work, home and community activities. Lab-provided benefits that help you do that include on-site child care, a credit union, flexible work schedules, generous leave and vacation programs, and much more. A wide variety of social clubs at Argonne promote fellowship and diversity. You can work at Argonne and also have a life of interest and fulfillment. "I

  16. Soil Water Balance and Recharge Monitoring at the Hanford Site - FY09 Status Report

    SciTech Connect (OSTI)

    Rockhold, Mark L.; Saunders, Danielle L.; Strickland, Christopher E.; Waichler, Scott R.; Clayton, Ray E.

    2009-09-28

    Recharge provides the primary driving force for transporting contaminants from the vadose zone to underlying aquifer systems. Quantification of recharge rates is important for assessing contaminant transport and fate and for evaluating remediation alternatives. This report describes the status of soil water balance and recharge monitoring performed by Pacific Northwest National Laboratory at the Hanford Site for Fiscal Year 2009. Previously reported data for Fiscal Years 2004 - 2008 are updated with data collected in Fiscal Year 2009 and summarized.

  17. FY 2010 Annual Uncosted Balances Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Uncosted Balances Reports » FY 2010 Annual Uncosted Balances Report FY 2010 Annual Uncosted Balances Report This report represents an analysis of the Department's uncosted balances for FY 2010. In FY 2009, the American Recovery and Reinvestment Act of 2009 (Recovery Act) provided the Department an additional $36.7 billion of funding. The FY 2010 uncosted balances associated with Recovery Act funding are separately presented but are not included in the additional analysis of uncosted

  18. FY 2012 Annual Uncosted Balances Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Uncosted Balances Reports » FY 2012 Annual Uncosted Balances Report FY 2012 Annual Uncosted Balances Report This report presents the results of the Department's annual analysis of uncosted balances for FY 2012. In FY 2009, the American Recovery and Reinvestment Act of 2009 (Recovery Act) provided the Department an additional $36.7 billion of funding. The FY 2012 uncosted balances associated with Recovery Act funding are separately presented but are not included in the additional analysis

  19. Year Modules

    U.S. Energy Information Administration (EIA) Indexed Site

    Annual photovoltaic module shipments, 2003-2013 (peak kilowatts) Year Modules 2003 80,062 2004 143,274 2005 204,996 2006 320,208 2007 494,148 2008 920,693 2009 1,188,879 2010 2,644,498 2011 3,772,075 2012 4,655,005 2013 4,984,881 Source: U.S. Energy Information Administration, Form EIA-63B, 'Annual Photovoltaic Cell/Module Shipments Report.' Note: Includes both U.S. Shipments and Exports.

  20. Year Modules

    U.S. Energy Information Administration (EIA) Indexed Site

    dollars per peak watt) Year Modules 2003 $3.17 2004 $2.99 2005 $3.19 2006 $3.50 2007 $3.37 2008 $3.49 2009 $2.79 2010 $1.96 2011 $1.59 2012 $1.15 2013 $0.75 Table 4. Average value of photovoltaic modules, 2003-2013 Source: U.S. Energy Information Administration, Form EIA-63B, 'Annual Photovoltaic Cell/Module Shipments Report.' Note: Dollars are not adjusted for inflation.

  1. An unconventional method for load balancing

    SciTech Connect (OSTI)

    Deng, Y.; McCoy, R.A.; Marr, R.B.

    1995-12-01

    A new method of load balancing is introduced based on the idea of dynamically relocating virtual processes corresponding to computations on an abstract system with a larger number of processors. The algorithm introduced preserves the locality of nearest neighbor interactions and has been tested on simulated data and a molecular dynamics code.

  2. An unconventional method for load balancing

    SciTech Connect (OSTI)

    Deng, Y.; McCoy, R.A.; Marr, R.B.; Peierls, R.F.

    1995-08-01

    A new method of load balancing is introduced based on the idea of dynamically relocating virtual processes corresponding to computations on an abstract system with a large number of processors. The algorithm introduced preserves the locality of nearest neighbor interactions and has been tested on simulated data and a molecular dynamics code.

  3. Torque-balanced vibrationless rotary coupling

    DOE Patents [OSTI]

    Miller, Donald M. (Sunnyside, WA)

    1980-01-01

    This disclosure describes a torque-balanced vibrationless rotary coupling for transmitting rotary motion without unwanted vibration into the spindle of a machine tool. A drive member drives a driven member using flexible connecting loops which are connected tangentially and at diametrically opposite connecting points through a free floating ring.

  4. Energy balance of ENDF/B-VI

    SciTech Connect (OSTI)

    MacFarlane, R.E.

    1994-06-01

    ENDF/B-VI through Release 2 has been tested for neutron-photon energy balance using the Heater module of the NJOY nuclear data procesing system. The situation is much improved over ENDF/B-V, but there are still a number of maerials that show problems.

  5. Wind Integration Program: Balancing the Future

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wind Integration Program: Balancing the Future Initial Discussions 3072012 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Background BPA has implemented a number...

  6. FISCAL YEAR 2014-2019 STRATEGIC PLAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Build & maintain an efficient & effective organization Hold recipients & overseers of Department funds accountable for actions that result in fraud, waste and/or abuse Provide independent, accurate, timely, and balanced information to the Department, Congress, and other key stakeholders FISCAL YEAR 2014-2019 STRATEGIC PLAN

  7. Isorropia Partitioning and Load Balancing Package

    Energy Science and Technology Software Center (OSTI)

    2006-09-01

    Isorropia is a partitioning and load balancing package which interfaces with the Zoltan library. Isorropia can accept input objects such as matrices and matrix-graphs, and repartition/redistribute them into a better data distribution on parallel computers. Isorropia is primarily an interface package, utilizing graph and hypergraph partitioning algorithms that are in the Zoltan library which is a third-party library to Tilinos.

  8. Development of Energy Balances for the State of California

    SciTech Connect (OSTI)

    Murtishaw, Scott; Price, Lynn; de la Rue du Can, Stephane; Masanet, Eric; Worrell, Ernst; Sahtaye, Jayant

    2005-12-01

    Analysts assessing energy policies and energy modelers forecasting future trends need to have access to reliable and concise energy statistics. Lawrence Berkeley National Laboratory evaluated several sources of California energy data, primarily from the California Energy Commission and the U.S. Energy Information Administration, to develop the California Energy Balance Database (CALEB). This database manages highly disaggregated data on energy supply, transformation, and end-use consumption for each type of energy commodity from 1990 to the most recent year available (generally 2001) in the form of an energy balance, following the methodology used by the International Energy Agency. This report presents the data used for CALEB and provides information on how the various data sources were reconciled. CALEB offers the possibility of displaying all energy flows in numerous ways (e.g.,physical units, Btus, petajoules, different levels of aggregation), facilitating comparisons among the different types of energy commodities and different end-use sectors. In addition to displaying energy data, CALEB can also be used to calculate state-level energy-related carbon dioxide emissions using the methodology of the Intergovernmental Panel on Climate Change.

  9. Balanced pressure techniques applied to geothermal drilling

    SciTech Connect (OSTI)

    Dareing, D.W.

    1981-08-01

    The objective of the study is to evaluate balanced pressure drilling techniques for use in combating lost circulation in geothermal drilling. Drilling techniques evaluated are: aerated drilling mud, parasite tubing, concentric drill pipe, jet sub, and low density fluids. Based on the present state of the art of balanced pressure drilling techniques, drilling with aerated water has the best overall balance of performance, risk, availability, and cost. Aerated water with a 19:1 free air/water ratio reduce maximum pressure unbalance between wellbore and formation pressures from 1000 psi to 50 psi. This pressure unbalance is within acceptable operating limits; however, air pockets could form and cause pressure surges in the mud system due to high percent of air. Low density fluids used with parasite tubing has the greatest potential for combating lost circulation in geothermal drilling, when performance only is considered. The top portion of the hole would be aerated through the parasite tube at a 10:1 free air/mud ratio and the low density mud could be designed so that its pressure gradient exactly matches the formation pore pressure gradient. The main problem with this system at present is the high cost of ceramic beads needed to produce low density muds.

  10. Balancing Hydronic Systems in Multifamily Buildings

    SciTech Connect (OSTI)

    Ruch, Russell; Ludwig, Peter; Maurer, Tessa

    2014-07-01

    In multifamily hydronic systems, temperature imbalance may be caused by undersized piping, improperly adjusted balancing valves, inefficient water temperature and flow levels, and owner/occupant interaction with the boilers, distribution, and controls. The imbalance leads to tenant discomfort, higher energy use intensity, and inefficient building operation. This research, conducted by Building America team Partnership for Advanced Residential Retrofit, explores cost-effective distribution upgrades and balancing measures in multifamily hydronic systems, providing a resource to contractors, auditors, and building owners on best practices to improve tenant comfort and lower operating costs. The team surveyed existing knowledge on cost-effective retrofits for optimizing distribution in typical multifamily hydronic systems, with the aim of identifying common situations and solutions, and then conducted case studies on two Chicago area buildings with known balancing issues in order to quantify the extent of temperature imbalance. At one of these buildings a booster pump was installed on a loop to an underheated wing of the building. This study found that unit temperature in a multifamily hydronic building can vary as much as 61°F, particularly if windows are opened or tenants use intermittent supplemental heating sources like oven ranges. Average temperature spread at the building as a result of this retrofit decreased from 22.1°F to 15.5°F.

  11. Balancing Hydronic Systems in Multifamily Buildings

    SciTech Connect (OSTI)

    Ruch, R.; Ludwig, P.; Maurer, T.

    2014-07-01

    In multifamily hydronic systems, temperature imbalance may be caused by undersized piping, improperly adjusted balancing valves, inefficient water temperature and flow levels, and owner/occupant interaction with the boilers, distribution and controls. The effects of imbalance include tenant discomfort, higher energy use intensity and inefficient building operation. This paper explores cost-effective distribution upgrades and balancing measures in multifamily hydronic systems, providing a resource to contractors, auditors, and building owners on best practices to improve tenant comfort and lower operating costs. The research was conducted by The Partnership for Advanced Residential Retrofit (PARR) in conjunction with Elevate Energy. The team surveyed existing knowledge on cost-effective retrofits for optimizing distribution in typical multifamily hydronic systems, with the aim of identifying common situations and solutions, and then conducted case studies on two Chicago area buildings with known balancing issues in order to quantify the extent of temperature imbalance. At one of these buildings a booster pump was installed on a loop to an underheated wing of the building. This study found that unit temperature in a multifamily hydronic building can vary as much as 61 degrees F, particularly if windows are opened or tenants use intermittent supplemental heating sources like oven ranges. Average temperature spread at the building as a result of this retrofit decreased from 22.1 degrees F to 15.5 degrees F.

  12. Flat-Plate Photovoltaic Balance of System Basics | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Flat-Plate Photovoltaic Balance of System Basics Flat-Plate Photovoltaic Balance of System Basics August 20, 2013 - 4:29pm Addthis Complete photovoltaic (PV) energy systems are ...

  13. TRANSFORMER FOR JOINING UNBALANCED TO BALANCED TRANSMISSION MEANS

    DOE Patents [OSTI]

    Bittner, B.J.; Opperman, R.H.

    1960-06-28

    An improved transformer is invented for joining an unbalanced transmission means to a balanced transmission means and is useful, for example, in transmitting an electromagnetic signal from a coaxial cable to a balanced dipole antenna.

  14. Balance-of-System Equipment Required for Renewable Energy Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Balance-of-System Equipment Required for Renewable Energy Systems Balance-of-System Equipment Required for Renewable Energy Systems July 2, 2012 - 8:21pm Addthis Both...

  15. Analysis of reactor trips originating in balance of plant systems

    SciTech Connect (OSTI)

    Stetson, F.T.; Gallagher, D.W.; Le, P.T.; Ebert, M.W. )

    1990-09-01

    This report documents the results of an analysis of balance-of-plant (BOP) related reactor trips at commercial US nuclear power plants of a 5-year period, from January 1, 1984, through December 31, 1988. The study was performed for the Plant Systems Branch, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission. The objectives of the study were: to improve the level of understanding of BOP-related challenges to safety systems by identifying and categorizing such events; to prepare a computerized data base of BOP-related reactor trip events and use the data base to identify trends and patterns in the population of these events; to investigate the risk implications of BOP events that challenge safety systems; and to provide recommendations on how to address BOP-related concerns in regulatory context. 18 refs., 2 figs., 27 tabs.

  16. Finding Balance Between Biological Groundwater Treatment and Treated Injection Water

    SciTech Connect (OSTI)

    Carlson, Mark A.; Nielsen, Kellin R.; Byrnes, Mark E.; Simmons, Sally A.; Morse, John J.; Geiger, James B.; Watkins, Louis E.; McFee, Phillip M.; Martins, K.

    2015-01-14

    At the U.S. Department of Energy’s Hanford Site, CH2M HILL Plateau Remediation Company operates the 200 West Pump and Treat which was engineered to treat radiological and chemical contaminants in groundwater as a result of the site’s former plutonium production years. Fluidized bed bioreactors (FBRs) are used to remove nitrate, metals, and volatile organic compounds. Increasing nitrate concentrations in the treatment plant effluent and the presence of a slimy biomass (a typical microorganism response to stress) in the FBRs triggered an investigation of nutrient levels in the system. Little, if any, micronutrient feed was coming into the bioreactors. Additionally, carbon substrate (used to promote biological growth) was passing through to the injection wells, causing biological fouling of the wells and reduced specific injectivity. Adjustments to the micronutrient feed improved microorganism health, but the micronutrients were being overfed (particularly manganese) plugging the injection wells further. Injection well rehabilitation to restore specific injectivity required repeated treatments to remove the biological fouling and precipitated metal oxides. A combination of sulfamic and citric acids worked well to dissolve metal oxides and sodium hypochlorite effectively removed the biological growth. Intensive surging and development techniques successfully removed clogging material from the injection wells. Ultimately, the investigation and nutrient adjustments took months to restore proper balance to the microbial system and over a year to stabilize injection well capacities. Carefully tracking and managing the FBRs and well performance monitoring are critical to balancing the needs of the treatment system while reducing fouling mechanisms in the injection wells.

  17. Voltage balanced multilevel voltage source converter system

    DOE Patents [OSTI]

    Peng, Fang Zheng (Oak Ridge, TN); Lai, Jih-Sheng (Knoxville, TN)

    1997-01-01

    A voltage balanced multilevel converter for high power AC applications such as adjustable speed motor drives and back-to-back DC intertie of adjacent power systems. This converter provides a multilevel rectifier, a multilevel inverter, and a DC link between the rectifier and the inverter allowing voltage balancing between each of the voltage levels within the multilevel converter. The rectifier is equipped with at least one phase leg and a source input node for each of the phases. The rectifier is further equipped with a plurality of rectifier DC output nodes. The inverter is equipped with at least one phase leg and a load output node for each of the phases. The inverter is further equipped with a plurality of inverter DC input nodes. The DC link is equipped with a plurality of rectifier charging means and a plurality of inverter discharging means. The plurality of rectifier charging means are connected in series with one of the rectifier charging means disposed between and connected in an operable relationship with each adjacent pair of rectifier DC output nodes. The plurality of inverter discharging means are connected in series with one of the inverter discharging means disposed between and connected in an operable relationship with each adjacent pair of inverter DC input nodes. Each of said rectifier DC output nodes are individually electrically connected to the respective inverter DC input nodes. By this means, each of the rectifier DC output nodes and each of the inverter DC input nodes are voltage balanced by the respective charging and discharging of the rectifier charging means and the inverter discharging means.

  18. Voltage balanced multilevel voltage source converter system

    DOE Patents [OSTI]

    Peng, F.Z.; Lai, J.S.

    1997-07-01

    Disclosed is a voltage balanced multilevel converter for high power AC applications such as adjustable speed motor drives and back-to-back DC intertie of adjacent power systems. This converter provides a multilevel rectifier, a multilevel inverter, and a DC link between the rectifier and the inverter allowing voltage balancing between each of the voltage levels within the multilevel converter. The rectifier is equipped with at least one phase leg and a source input node for each of the phases. The rectifier is further equipped with a plurality of rectifier DC output nodes. The inverter is equipped with at least one phase leg and a load output node for each of the phases. The inverter is further equipped with a plurality of inverter DC input nodes. The DC link is equipped with a plurality of rectifier charging means and a plurality of inverter discharging means. The plurality of rectifier charging means are connected in series with one of the rectifier charging means disposed between and connected in an operable relationship with each adjacent pair of rectifier DC output nodes. The plurality of inverter discharging means are connected in series with one of the inverter discharging means disposed between and connected in an operable relationship with each adjacent pair of inverter DC input nodes. Each of said rectifier DC output nodes are individually electrically connected to the respective inverter DC input nodes. By this means, each of the rectifier DC output nodes and each of the inverter DC input nodes are voltage balanced by the respective charging and discharging of the rectifier charging means and the inverter discharging means. 15 figs.

  19. Heat Balance Study for Submersible Mixer Pump

    SciTech Connect (OSTI)

    Lee, S.Y.

    2003-07-21

    A transient heat balance model was developed to assess the impact of a Submersible Mixer Pump (SMP) on waste temperature during the process of waste mixing and removal for the Type-I SRS tanks. The model results will be mainly used to determine the SMP design impacts on the waste tank temperature during operations and to develop a specification for a new SMP design to replace existing long-shaft mixer pumps used during waste removal. The model will also be used to provide input to the operation planning. This planning will be used as input to pump run duration in order to maintain temperature requirements within the tank during SMP operation.

  20. Reflective optical imaging systems with balanced distortion

    DOE Patents [OSTI]

    Hudyma, Russell M.

    2001-01-01

    Optical systems compatible with extreme ultraviolet radiation comprising four reflective elements for projecting a mask image onto a substrate are described. The four optical elements comprise, in order from object to image, convex, concave, convex and concave mirrors. The optical systems are particularly suited for step and scan lithography methods. The invention enables the use of larger slit dimensions associated with ring field scanning optics, improves wafer throughput, and allows higher semiconductor device density. The inventive optical systems are characterized by reduced dynamic distortion because the static distortion is balanced across the slit width.

  1. Reflective optical imaging system with balanced distortion

    DOE Patents [OSTI]

    Chapman, Henry N.; Hudyma, Russell M.; Shafer, David R.; Sweeney, Donald W.

    1999-01-01

    An optical system compatible with short wavelength (extreme ultraviolet) An optical system compatible with short wavelength (extreme ultraviolet) radiation comprising four reflective elements for projecting a mask image onto a substrate. The four optical elements comprise, in order from object to image, convex, concave, convex and concave mirrors. The optical system is particularly suited for step and scan lithography methods. The invention enables the use of larger slit dimensions associated with ring field scanning optics, improves wafer throughput and allows higher semiconductor device density. The inventive optical system is characterized by reduced dynamic distortion because the static distortion is balanced across the slit width.

  2. Rotary engine cooling system with flow balancing

    SciTech Connect (OSTI)

    Jones, C.

    1987-05-12

    This patent describes a rotary internal combustion engine having a trochoid rotor housing section and having a group of cooling passages extending through a top-dead-center (TDC) region. The engine is characterized by: at least one passage of the group following a curved path which extends through a first hotter portion of the TDC region, by at least one further passage of the group following a substantially uncurved path through a second cooler portion of the TDC region, and by a fluid restriction for restricting fluid flow through the at least one further passage to balance coolant flow between the passages.

  3. Steam System Balancing and Tuning for Multifamily Residential Buildings in Chicagoland - Second Year of Data Collection

    SciTech Connect (OSTI)

    Choi, Jayne; Ludwig, Peter; Brand, Larry

    2013-08-01

    Steam heated buildings often suffer from uneven heating as a result of poor control of the amount of steam entering each radiator. In order to satisfy the heating load to the coldest units, other units are overheated. As a result, some tenants complain of being too hot and open their windows in the middle of winter, while others complain of being too cold and are compelled to use supplemental heat sources.

  4. Effect of short-term material balances on the projected uranium measurement uncertainties for the gas centrifuge enrichment plant

    SciTech Connect (OSTI)

    Younkin, J.M.; Rushton, J.E.

    1980-02-05

    A program is under way to design an effective International Atomic Energy Agency (IAEA) safeguards system that could be applied to the Portsmouth Gas Centrifuge Enrichment Plant (GCEP). This system would integrate nuclear material accountability with containment and surveillance. Uncertainties in material balances due to errors in the measurements of the declared uranium streams have been projected on a yearly basis for GCEP under such a system in a previous study. Because of the large uranium flows, the projected balance uncertainties were, in some cases, greater than the IAEA goal quantity of 75 kg of U-235 contained in low-enriched uranium. Therefore, it was decided to investigate the benefits of material balance periods of less than a year in order to improve the sensitivity and timeliness of the nuclear material accountability system. An analysis has been made of projected uranium measurement uncertainties for various short-term material balance periods. To simplify this analysis, only a material balance around the process area is considered and only the major UF/sub 6/ stream measurements are included. That is, storage areas are not considered and uranium waste streams are ignored. It is also assumed that variations in the cascade inventory are negligible compared to other terms in the balance so that the results obtained in this study are independent of the absolute cascade inventory. This study is intended to provide information that will serve as the basis for the future design of a dynamic materials accounting component of the IAEA safeguards system for GCEP.

  5. Dynamic load balance scheme for the DSMC algorithm

    SciTech Connect (OSTI)

    Li, Jin; Geng, Xiangren; Jiang, Dingwu; Chen, Jianqiang

    2014-12-09

    The direct simulation Monte Carlo (DSMC) algorithm, devised by Bird, has been used over a wide range of various rarified flow problems in the past 40 years. While the DSMC is suitable for the parallel implementation on powerful multi-processor architecture, it also introduces a large load imbalance across the processor array, even for small examples. The load imposed on a processor by a DSMC calculation is determined to a large extent by the total of simulator particles upon it. Since most flows are impulsively started with initial distribution of particles which is surely quite different from the steady state, the total of simulator particles will change dramatically. The load balance based upon an initial distribution of particles will break down as the steady state of flow is reached. The load imbalance and huge computational cost of DSMC has limited its application to rarefied or simple transitional flows. In this paper, by taking advantage of METIS, a software for partitioning unstructured graphs, and taking the total of simulator particles in each cell as a weight information, the repartitioning based upon the principle that each processor handles approximately the equal total of simulator particles has been achieved. The computation must pause several times to renew the total of simulator particles in each processor and repartition the whole domain again. Thus the load balance across the processors array holds in the duration of computation. The parallel efficiency can be improved effectively. The benchmark solution of a cylinder submerged in hypersonic flow has been simulated numerically. Besides, hypersonic flow past around a complex wing-body configuration has also been simulated. The results have displayed that, for both of cases, the computational time can be reduced by about 50%.

  6. Seasonality in the Natural Gas Balancing Item: Historical Trends and

    U.S. Energy Information Administration (EIA) Indexed Site

    Corrective Measures Analysis > Seasonality in the Natural Gas Balancing Item: Historical Trends and Corrective Measures Seasonality in the Natural Gas Balancing Item: Historical Trends and Corrective Measures Released: June 4, 2010 Download Full Report (PDF) This special report examines an underlying cause of the seasonal pattern in the balancing item published in the Natural Gas Monthly. Research finds that a significant portion of data collected on EIA’s primary monthly natural gas

  7. FY 2007 Annual Uncosted Balances Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Uncosted Balances Reports » FY 2007 Annual Uncosted Balances Report FY 2007 Annual Uncosted Balances Report The Department faced significant challenges due to the unusually long Continuing Resolution (CR), which extended until April 2007. Under the CR the Department must act conservatively to ensure that obligations and costs are restrained in order to mitigate any negative impacts should actual appropriations differ significantly from planned and budgeted amounts. In addition, the

  8. Horizontal film balance having wide range and high sensitivity

    DOE Patents [OSTI]

    Abraham, B.M.; Miyano, K.; Ketterson, J.B.

    1981-03-05

    A thin-film, horizontal balance instrument is provided for measuring surface tension (surface energy) of thin films suspended on a liquid substrate. The balance includes a support bearing and an optical feedback arrangement for wide-range, high sensitivity measurements. The force on the instrument is balanced by an electromagnet, the current through the magnet providing a measure of the force applied to the instrument. A novel float construction is also disclosed.

  9. Horizontal film balance having wide range and high sensitivity

    DOE Patents [OSTI]

    Abraham, B.M.; Miyano, K.; Ketterson, J.B.

    1983-11-08

    A thin-film, horizontal balance instrument is provided for measuring surface tension (surface energy) of thin films suspended on a liquid substrate. The balance includes a support bearing and an optical feedback arrangement for wide-range, high sensitivity measurements. The force on the instrument is balanced by an electromagnet, the current through the magnet providing a measure of the force applied to the instrument. A novel float construction is also disclosed. 5 figs.

  10. Horizontal film balance having wide range and high sensitivity

    DOE Patents [OSTI]

    Abraham, Bernard M.; Miyano, Kenjiro; Ketterson, John B.

    1983-01-01

    A thin-film, horizontal balance instrument is provided for measuring surface tension (surface energy) of thin films suspended on a liquid substrate. The balance includes a support bearing and an optical feedback arrangement for wide-range, high sensitivity measurements. The force on the instrument is balanced by an electromagnet, the current through the magnet providing a measure of the force applied to the instrument. A novel float construction is also disclosed.

  11. FY 2008 & FY 2009 Annual Uncosted Balances Report

    Broader source: Energy.gov [DOE]

    This report presents a combined presentation and analysis of the Department’s uncosted balances for FY 2008 and FY 2009.

  12. Balance-of-System Equipment Required for Renewable Energy Systems |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Balance-of-System Equipment Required for Renewable Energy Systems Balance-of-System Equipment Required for Renewable Energy Systems Both grid-connected and off-grid home renewable energy systems require additional “balance-of-system” equipment. Both grid-connected and off-grid home renewable energy systems require additional "balance-of-system" equipment. Whether you decide to connect your home renewable energy system to the electric grid or not, you

  13. Power Electronics and Balance of System Hardware Technologies

    Broader source: Energy.gov [DOE]

    DOE is targeting solar technology improvements related to power electronics and balance of system (BOS) hardware technologies to reduce the installed cost of solar photovoltaic (PV) electricity and...

  14. Acquisition Guide Chapter 1.3 - Balanced Scorecard Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Scorecard procurement performance assessment programs used by the Department's ... The Balanced Scorecard is the most acceptable alternative to the Contractor Purchasing ...

  15. Balance of Plant Needs and Integration of Stack Components for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Needs and Integration of Stack Components for Stationary Power and CHP Applications Balance of Plant Needs and Integration of Stack Components for Stationary Power and CHP ...

  16. Development of a Stiffness-Based Chemistry Load Balancing Scheme...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of a Stiffness-Based Chemistry Load Balancing Scheme, and Optimization of IO and Communication, to Enable Massively Parallel High-Fidelity Internal Combustion Engine Simulations...

  17. ,"U.S. Natural Gas Monthly Supply and Disposition Balance"

    U.S. Energy Information Administration (EIA) Indexed Site

    Monthly Supply and Disposition Balance" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest Data for" ,"Data...

  18. ,"U.S. Natural Gas Annual Supply and Disposition Balance"

    U.S. Energy Information Administration (EIA) Indexed Site

    Annual Supply and Disposition Balance" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest Data for" ,"Data...

  19. Internal combustion engine cylinder-to-cylinder balancing with balanced air-fuel ratios

    DOE Patents [OSTI]

    Harris, Ralph E.; Bourn, Gary D.; Smalley, Anthony J.

    2006-01-03

    A method of balancing combustion among cylinders of an internal combustion engine. For each cylinder, a normalized peak firing pressure is calculated as the ratio of its peak firing pressure to its combustion pressure. Each cylinder's normalized peak firing pressure is compared to a target value for normalized peak firing pressure. The fuel flow is adjusted to any cylinder whose normalized peak firing pressure is not substantially equal to the target value.

  20. An Energy Storage Assessment: Using Optimal Control Strategies to Capture Multiple Services

    SciTech Connect (OSTI)

    Wu, Di; Jin, Chunlian; Balducci, Patrick J.; Kintner-Meyer, Michael CW

    2015-09-01

    This paper presents a methodology for evaluating benefits of battery storage for multiple grid applications, including energy arbitrage, balancing service, capacity value, distribution system equipment deferral, and outage mitigation. In the proposed method, at each hour, a look-ahead optimization is first formulated and solved to determine battery base operating point. The minute by minute simulation is then performed to simulate the actual battery operation. This methodology is used to assess energy storage alternatives in Puget Sound Energy System. Different battery storage candidates are simulated for a period of one year to assess different value streams and overall benefits, as part of a financial feasibility evaluation of battery storage projects.

  1. FY 2007 Report on Uncosted Balances

    Energy Savers [EERE]

    ... Action Contract (RAC) at the MOAB site, originally scheduled for early in the fiscal year. but was delayed until June 2007 when it was awarded to Energy Solutions Federal Services. ...

  2. The United States Plutonium Balance, 1944 - 2009

    National Nuclear Security Administration (NNSA)

    ... data through 2009. Over the 65-year history of the U.S. nuclear program, there have been many ... a commercial U.S. power reactor for testing. 14 5. Excess Determinations ...

  3. FY09 Property Balanced Score Card Fed | Department of Energy

    Energy Savers [EERE]

    Property Balanced Score Card Fed FY09 Property Balanced Score Card Fed PDF icon Microsoft Word - FY09PropertyBSCFed.doc More Documents & Publications Microsoft Word - FY09PropertyBSCContractor.doc Microsoft Word - FY10PropertyBSCFed.doc Microsoft Word - FY10PropertyBSCContractor.doc

  4. HPSS Yearly Network Traffic

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HPSS Yearly Network Traffic HPSS Yearly Network Traffic Yearly Summary of IO Traffic Between Storage and Network Destinations These bar charts show the total transfer traffic for...

  5. Balancing technique for Ross-type Stirling and other machines

    SciTech Connect (OSTI)

    Wood, J.G.; Ross, M.A.

    1992-09-15

    This patent describes an apparatus for balancing inertia forces and rocking couples resulting from the approximately parallel reciprocation of a pair of unequal piston masses linked to a crankshaft and reciprocating out of phase, it comprises: a first counter balance weight mounted to the crankshaft eccentrically of the crankshaft axis of rotation and at an angle which leads the crank throw by a lead angle of more than 180[degrees]; a balance shaft mounted for rotation about an axis parallel to the crankshaft axis and drivingly coupled to the crankshaft and a second counter balance weight mounted eccentrically to the balance shaft and having the product of its mass multiplied by the radial, eccentric offset of its center of mass equal to the product of the first counterbalance weight multiplied by the radial eccentric offset of its center of mass and positioned to lead the crank throw by the lead angle of the first counterbalance mass.

  6. Means and method of balancing multi-cylinder reciprocating machines

    DOE Patents [OSTI]

    Corey, John A.; Walsh, Michael M.

    1985-01-01

    A virtual balancing axis arrangement is described for multi-cylinder reciprocating piston machines for effectively balancing out imbalanced forces and minimizing residual imbalance moments acting on the crankshaft of such machines without requiring the use of additional parallel-arrayed balancing shafts or complex and expensive gear arrangements. The novel virtual balancing axis arrangement is capable of being designed into multi-cylinder reciprocating piston and crankshaft machines for substantially reducing vibrations induced during operation of such machines with only minimal number of additional component parts. Some of the required component parts may be available from parts already required for operation of auxiliary equipment, such as oil and water pumps used in certain types of reciprocating piston and crankshaft machine so that by appropriate location and dimensioning in accordance with the teachings of the invention, the virtual balancing axis arrangement can be built into the machine at little or no additional cost.

  7. HPSS Yearly Network Traffic

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HPSS Yearly Network Traffic HPSS Yearly Network Traffic Yearly Summary of I/O Traffic Between Storage and Network Destinations These bar charts show the total transfer traffic for each year between storage and network destinations (systems within and outside of NERSC). Traffic for the current year is an estimate derived by scaling the known months traffic up to 12 months. The years shown are calendar years. The first graph shows the overall growth in network traffic to storage over the years.

  8. Photovoltaic balance-of-system designs and costs at PVUSA

    SciTech Connect (OSTI)

    Reyes, A.B.; Jennings, C.

    1995-05-01

    This report is one in a series of 1994-1995 PVUSA reports that document PVUSA lessons learned at demonstration sites in California and Texas. During the last 7 years (1988 to 1994), 16 PV systems ranging from 20 kW to 500 kW have been installed. Six 20-kW emerging module technology (EMT) arrays and three turnkey (i.e., vendor designed and integrated) utility-scale systems were procured and installed at PVUSA`s main test site in Davis, California. PVUSA host utilities have installed a total of seven EMT arrays and utility-scale systems in their service areas. Additional systems at Davis and host utility sites are planned. One of PVUSA`s key objectives is to evaluate the performance, reliability, and cost of PV balance-of-system (BOS). In the procurement stage PVUSA encouraged innovative design to improve upon present practice by reducing maintenance, improving reliability, or lowering manufacturing or construction costs. The project team worked closely with suppliers during the design stage not only to ensure designs met functional and safety specifications, but to provide suggestions for improvement. This report, intended for the photovoltaic (PV) industry and for utility project managers and engineers considering PV plant construction and ownership, documents PVUSA utility-scale system design and cost lessons learned. Complementary PVUSA topical reports document: construction and safety experience; five-year assessment of EMTs; validation of the Kerman 500-kW grid-support PV plant benefits; PVUSA instrumentation and data analysis techniques; procurement, acceptance, and rating practices for PV power plants; experience with power conditioning units and power quality.

  9. Preliminary Examination of the Supply and Demand Balance for Renewable Electricity

    SciTech Connect (OSTI)

    Swezey, B.; Aabakken, J.; Bird, L.

    2007-10-01

    In recent years, the demand for renewable electricity has accelerated as a consequence of state and federal policies and the growth of voluntary green power purchase markets, along with the generally improving economics of renewable energy development. This paper reports on a preliminary examination of the supply and demand balance for renewable electricity in the United States, with a focus on renewable energy projects that meet the generally accepted definition of "new" for voluntary market purposes, i.e., projects installed on or after January 1, 1997. After estimating current supply and demand, this paper presents projections of the supply and demand balance out to 2010 and describe a number of key market uncertainties.

  10. Control of carbon balance in a silicon smelting furnace

    DOE Patents [OSTI]

    Dosaj, V.D.; Haines, C.M.; May, J.B.; Oleson, J.D.

    1992-12-29

    The present invention is a process for the carbothermic reduction of silicon dioxide to form elemental silicon. Carbon balance of the process is assessed by measuring the amount of carbon monoxide evolved in offgas exiting the furnace. A ratio of the amount of carbon monoxide evolved and the amount of silicon dioxide added to the furnace is determined. Based on this ratio, the carbon balance of the furnace can be determined and carbon feed can be adjusted to maintain the furnace in carbon balance.

  11. Balance-of-System Equipment Required for Renewable Energy Systems...

    Broader source: Energy.gov (indexed) [DOE]

    Both grid-connected and off-grid home renewable energy systems require additional balance-of-system equipment. Both grid-connected and off-grid home renewable energy...

  12. Design of dynamic load-balancing tools for parallel applications

    SciTech Connect (OSTI)

    Devine, K.D.; Hendrickson, B.A.; Boman, E.G.; St. John, M.; Vaughan, C.T.

    2000-01-03

    The design of general-purpose dynamic load-balancing tools for parallel applications is more challenging than the design of static partitioning tools. Both algorithmic and software engineering issues arise. The authors have addressed many of these issues in the design of the Zoltan dynamic load-balancing library. Zoltan has an object-oriented interface that makes it easy to use and provides separation between the application and the load-balancing algorithms. It contains a suite of dynamic load-balancing algorithms, including both geometric and graph-based algorithms. Its design makes it valuable both as a partitioning tool for a variety of applications and as a research test-bed for new algorithmic development. In this paper, the authors describe Zoltan's design and demonstrate its use in an unstructured-mesh finite element application.

  13. Fact #674: May 9, 2011 Petroleum Trade Balance

    Broader source: Energy.gov [DOE]

    The trade balance (exports minus imports) for petroleum has been negative for more than a quarter of a century, meaning that the U.S. imports more petroleum than it exports. The largest petroleum...

  14. Sandia National Laboratories: Careers: Work-Life Balance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work-Life Balance People in park Your life is not just work We understand your time matters - that's why Sandia is flexible in many ways. Sandia encourages employees to have a healthy, multidimensional lifestyle and achieve a personal balance between home, work, and community life. We offer flexible work arrangements that serve as alternatives to the traditional workweek. Sandia also provides a fulfilling professional environment, a network of employee support resources, and an array of health

  15. Low excitatory innervation balances high intrinsic excitability of immature

    Office of Scientific and Technical Information (OSTI)

    dentate neurons (Journal Article) | DOE PAGES Low excitatory innervation balances high intrinsic excitability of immature dentate neurons Title: Low excitatory innervation balances high intrinsic excitability of immature dentate neurons Persistent neurogenesis in the dentate gyrus produces immature neurons with high intrinsic excitability and low levels of inhibition that are predicted to be more broadly responsive to afferent activity than mature neurons. Mounting evidence suggests that

  16. Wolfgang Eberhardt on Light Sources: Getting the Balance Right

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wolfgang Eberhardt on Light Sources: Getting the Balance Right Wolfgang Eberhardt on Light Sources: Getting the Balance Right Print Wolfgang Eberhardt at the Advanced Light Source, September 2015. Click the image to watch the video of his talk, "Diffraction Limited Storage Rings and Free Electron Lasers-Why Do We Need Both?" As a graduate student in the 1970s, Wolfgang Eberhardt conducted his first experiment at the old DESY synchrotron in Hamburg, Germany. A so-called

  17. Beginning Foreign Obligation Balances for the Power Reactors Presentation

    National Nuclear Security Administration (NNSA)

    Beginning Foreign Obligation Balances Beginning Foreign Obligation Balances for the Power Reactors for the Power Reactors Michael J. Smith Michael J. Smith NAC International NAC International Obligations Accounting Implementation Workshop Obligations Accounting Implementation Workshop January 13, 2004 January 13, 2004 Crowne Crowne Plaza Plaza Ravinia Ravinia Atlanta, Georgia Atlanta, Georgia Project Purpose Project Purpose * Bridge the gap in foreign obligated (FO) inventory tracking for US

  18. Low excitatory innervation balances high intrinsic excitability of immature

    Office of Scientific and Technical Information (OSTI)

    dentate neurons (Journal Article) | SciTech Connect Low excitatory innervation balances high intrinsic excitability of immature dentate neurons Citation Details In-Document Search Title: Low excitatory innervation balances high intrinsic excitability of immature dentate neurons Persistent neurogenesis in the dentate gyrus produces immature neurons with high intrinsic excitability and low levels of inhibition that are predicted to be more broadly responsive to afferent activity than mature

  19. Renewable portfolio standards in the states: balancing goals and rules

    Office of Scientific and Technical Information (OSTI)

    (Journal Article) | SciTech Connect Renewable portfolio standards in the states: balancing goals and rules Citation Details In-Document Search Title: Renewable portfolio standards in the states: balancing goals and rules Renewable portfolio standards establish a minimum percentage of electricity that retailers must provide from renewable energy sources. However, successful implementation must surmount the hurdle of RPS rules that vary from state to state along with their impacts on the

  20. Ultrafast kinetics subsequent to shock in an unreacted, oxygen balanced

    Office of Scientific and Technical Information (OSTI)

    mixture of nitromethane and hydrogen peroxide (Conference) | SciTech Connect kinetics subsequent to shock in an unreacted, oxygen balanced mixture of nitromethane and hydrogen peroxide Citation Details In-Document Search Title: Ultrafast kinetics subsequent to shock in an unreacted, oxygen balanced mixture of nitromethane and hydrogen peroxide Authors: Armstrong, M R ; Zaug, J M ; Grant, C D ; Crowhurst, J C ; Bastea, S Publication Date: 2014-06-24 OSTI Identifier: 1149544 Report Number(s):

  1. 50 Years of Space

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    50 Years of Space science-innovationassetsimagesicon-science.jpg 50 Years of Space Since 1943, some of the world's smartest and most dedicated technical people have ...

  2. 70 Years of Innovations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    70 Years of Innovations aboutassetsimagesicon-70th2.jpg Innovations: Celebrating 70 Years Since 1943, some of the world's smartest and most dedicated technical people have ...

  3. Dual shell pressure balanced reactor vessel. Final project report

    SciTech Connect (OSTI)

    Robertus, R.J.; Fassbender, A.G.

    1994-10-01

    The Department of Energy`s Office of Energy Research (OER) has previously provided support for the development of several chemical processes, including supercritical water oxidation, liquefaction, and aqueous hazardous waste destruction, where chemical and phase transformations are conducted at high pressure and temperature. These and many other commercial processes require a pressure vessel capable of operating in a corrosive environment where safety and economy are important requirements. Pacific Northwest Laboratory (PNL) engineers have recently developed and patented (U.S. patent 5,167,930 December 1, 1992) a concept for a novel Dual Shell Pressure Balanced Vessel (DSPBV) which could solve a number of these problems. The technology could be immediately useful in continuing commercialization of an R&D 100 award-winning technology, Sludge-to-oil Reactor System (STORS), originally developed through funding by OER. Innotek Corporation is a small business that would be one logical end-user of the DSPBV reactor technology. Innotek is working with several major U.S. engineering firms to evaluate the potential of this technology in the disposal of wastes from sewage treatment plants. PNL entered into a CRADA with Innotek to build a bench-scale demonstration reactor and test the system to advance the economic feasibility of a variety of high pressure chemical processes. Hydrothermal processing of corrosive substances on a large scale can now be made significantly safer and more economical through use of the DSPBV. Hydrothermal chemical reactions such as wet-air oxidation and supercritical water oxidation occur in a highly corrosive environment inside a pressure vessel. Average corrosion rates from 23 to 80 miles per year have been reported by Rice (1994) and Latanision (1993).

  4. Solid Oxide Fuel Cell Balance of Plant and Stack Component Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Balance of Plant and Stack Component Integration Solid Oxide Fuel Cell Balance of Plant and Stack Component Integration Presentation by Acumentrics Corporation for Solid Oxide Fuel ...

  5. Gas cooler sets the perfect balance

    SciTech Connect (OSTI)

    Bilder, M.; Aubry, L.; Schwartz, G.; Anderson, R.; Burkhardt, C. ); Wilson, J.; Vallort, J.; Ransick, M.F. )

    1993-05-20

    In July 1991, a 65-ton electric chiller was in need of major repair at NutraSweet's R and D facility outside of Chicago. Instead of automatically repairing or replacing that chiller, NutraSweet engineers Larry Aubry and Gerald Schwartz began to look at other alternatives. What they discovered was that a natural gas absorption chiller was a cost-effective, environmentally safe alternative effective, environmentally safe alternative perfectly suited for their application. The benefits for NutraSweet are straightforward: energy bills have been cut by more than [dollar sign]70,000 annually, existing boiler capacity is better utilized, existing electrical cooling system life is extended, maintenance costs are reduced, and no-ozone-depleting CFCs are utilized by the natural gas chiller. Simple payback on the unit, originally expected to be almost four years, has been reduced to closer to three.

  6. The United States Plutonium Balance, 1944 - 2009

    SciTech Connect (OSTI)

    2012-06-01

    This report updates the report -Plutonium: The first 50 years- which was released by the U.S.Department of Energy (DOE) in 1996. The topic of both reports is plutonium, sometimes referred to as Pu-239, which is capable of sustaining a nuclear chain reaction and is used in nuclear weapons and for nuclear power production. This report updates 1994 data through 2009. The four most significant changes since 1994 include: (a) the completion of cleanup activities at the Rocky Flats Plant in 2005; (b) material consolidation and disposition activities, especially shipments from Hanford to the Savannah River Site; (c) the 2007 declaration of an additional 9.0 MT of weapons grade plutonium to be surplus to defense needs in the coming decades; and (d) the opening of the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico in 1999.

  7. 70 years after Trinity

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    70 years after Trinity 70 years after Trinity Though the world has seen many changes since Trinity, one thing has remained constant: Los Alamos remains essential to our nation's ...

  8. Secretary Moniz's First Year

    Broader source: Energy.gov [DOE]

    We're looking back at some of the biggest moments from Energy Secretary Ernest Moniz's first year in office.

  9. Hydrogen program summary Fiscal Year 1994

    SciTech Connect (OSTI)

    Not Available

    1995-03-01

    The annual program summary provides stakeholders within the hydrogen community with a snapshop of important advances that have occurred in the National Hydrogen Program over the fiscal year, including industry interactions and cooperation. The document will also be used to encourage additional potential industrial partners to join the Hydrogen Program Team. Fiscal Year 1994 marked a turning point for the Hydrogen Program, with a budget that grew significantly. The focus of the program was broadened to include development of hydrogen production technologies using municipal solid waste and biomass, in addition to an increased emphasis on industrial involvement and near-term demonstration projects. In order to maintain its near- and long-term balance, the Hydrogen Program will continue with basic, fundamental research that provides the long-term, high-risk, high-payoff investment in hydrogen as an energy carrier.

  10. A Balanced Lifestyle Makes Time for Exercise | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Balanced Lifestyle Makes Time for Exercise Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) A Balanced Lifestyle Makes Time for Exercise Jim Bray 2012.09.18 In the past few weeks, we've shared #GetFit stories from our Niskayuna and San Ramon sites. GE Healthcare's #getfit campaign is a social media initiative to drive

  11. 2013 Year in Review

    Energy Savers [EERE]

    3 Year in Review i 2013 YIR May 2014 Year-in-Review: 2013 Energy Infrastructure Events and Expansions Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S. Department of Energy DOE / 2013 Year in Review ii 2013 YIR For Further Information This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and William Bryan, Deputy Assistant Secretary. Specific

  12. Final Year Project Report

    SciTech Connect (OSTI)

    Hubsch, Tristan

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  13. Allocation Year Rollover process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Allocatio Year Rollover process Allocation Year Rollover process December 23, 2013 by Francesca Verdier Allocation Year 2013 (AY13) ends at 23:59:59 on Monday, January 13, 2014. AY14 runs from Tuesday, January 14, 2014 through Monday, January 12, 2015. The major features of the rollover are: charging acroess the AY boundary: All batch jobs will continue running during the rollover. Time accrued before midnight will be charged to AY13 repos; time accrued after midnight will be charged to AY14

  14. Applied Science and Technology Task Order Fiscal Year 2009 Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End ...

  15. Applied Science and Technology Task Order Fiscal Year 2008 Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End ...

  16. Applied Science and Technology Task Order Fiscal Year 2011 Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End ...

  17. Applied Science and Technology Task Order Fiscal Year 2010 Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End ...

  18. Ten Year Site Plans

    Broader source: Energy.gov [DOE]

    A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the Department of Energy’s overall strategic plan. It is a...

  19. Welcome Year in Review

    National Nuclear Security Administration (NNSA)

    Training Meeting Orlando, Florida-May 23-25, 2006 Sponsored by the U.S. Department of Energy & the U.S. Nuclear Regulatory Commission Welcome & Year In Review Peter Dessaules...

  20. Cylinder To Cylinder Balancing Using Intake Valve Actuation

    DOE Patents [OSTI]

    Duffy, Kevin P.; Kieser, Andrew J.; Kilkenny, Jonathan P.

    2005-01-18

    A method and apparatus for balancing a combustion phasing between a plurality of cylinders located in an engine. The method and apparatus includes a determining a combustion timing in each cylinder, establishing a baseline parameter for a desired combustion timing, and varying actuation of at least one of a plurality of intake valves, each intake valve being in fluid communication with a corresponding cylinder, such that the combustion timing in each cylinder is substantially equal to the desired combustion timing.

  1. Offshore Wind Balance-of-System Cost Modeling

    SciTech Connect (OSTI)

    Maness, Michael; Stehly, Tyler; Maples, Ben; Mone, Christopher

    2015-09-29

    Offshore wind balance-of-system (BOS) costs contribute up to 70% of installed capital costs. Thus, it is imperative to understand the impact of these costs on project economics as well as potential cost trends for new offshore wind technology developments. As a result, the National Renewable Energy Laboratory (NREL) developed and recently updated a BOS techno-economic model using project cost estimates created from wind energy industry sources.

  2. Steam Balancing and Tuning for Multifamily Residential Buildings in Chicagoland

    SciTech Connect (OSTI)

    Choi, J.; Ludwig, P.; Brand, L.

    2012-08-01

    Older heating systems often suffer from mis-investment--multiple contractors upgrading parts of systems in inadequate or inappropriate ways that reduce system functionality and efficiency--or from a lack of proper maintenance. This technical report addresses these barriers to information, contractor resources, and cost-savings. Building off of previous research, CNT Energy conducted a study to identify best practices for the methodology, typical costs, and energy savings associated with steam; system balancing.

  3. Extreme Balance of System Hardware Cost Reduction (BOS-X) Funding

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opportunity | Department of Energy Extreme Balance of System Hardware Cost Reduction (BOS-X) Funding Opportunity Extreme Balance of System Hardware Cost Reduction (BOS-X) Funding Opportunity -- These projects are inactive -- Under the Extreme Balance of System Hardware Cost Reduction (BOS-X) program, DOE is funding new components and system designs to overcome scientific, technological, and engineering barriers to achieving safe, very low-cost, high-reliability balance of system (BOS)

  4. Solid Oxide Fuel Cell Balance of Plant and Stack Component Integration

    Broader source: Energy.gov [DOE]

    Presentation by Acumentrics Corporation for Solid Oxide Fuel Cell Balance of Plant and Stack Component Integration March 16, 2010

  5. Greening the Grid Special Topic: Facilitating the Integration of Renewable Energy through Balancing Cooperation

    SciTech Connect (OSTI)

    Cochran, Jaquelin

    2016-01-01

    The Greening the Grid animation shows facilitating the integration of renewable energy through balancing cooperation step-by-step.

  6. Surface Energy Balance System (SEBS) Handbook (Technical Report) | SciTech

    Office of Scientific and Technical Information (OSTI)

    Connect Surface Energy Balance System (SEBS) Handbook Citation Details In-Document Search Title: Surface Energy Balance System (SEBS) Handbook A Surface Energy Balance System (SEBS) has been installed collocated with each deployed ECOR system at the Southern Great Plains (SGP), North Slope of Alaska (NSA), Tropical Western Pacific (TWP), ARM Mobile Facility 1 (AMF1), and ARM Mobile Facility 2 (AMF2). The surface energy balance system consists of upwelling and downwelling solar and infrared

  7. Disentangling Mechanisms That Mediate the Balance Between Stochastic and Deterministic Processes in Microbial Succession

    SciTech Connect (OSTI)

    Dini-Andreote, Francisco; Stegen, James C.; van Elsas, Jan D.; Falcao Salles, Joana

    2015-03-17

    Despite growing recognition that deterministic and stochastic factors simultaneously influence bacterial communities, little is known about mechanisms shifting their relative importance. To better understand underlying mechanisms, we developed a conceptual model linking ecosystem development during primary succession to shifts in the stochastic/deterministic balance. To evaluate the conceptual model we coupled spatiotemporal data on soil bacterial communities with environmental conditions spanning 105 years of salt marsh development. At the local scale there was a progression from stochasticity to determinism due to Na accumulation with increasing ecosystem age, supporting a main element of the conceptual model. At the regional-scale, soil organic matter (SOM) governed the relative influence of stochasticity and the type of deterministic ecological selection, suggesting scale-dependency in how deterministic ecological selection is imposed. Analysis of a new ecological simulation model supported these conceptual inferences. Looking forward, we propose an extended conceptual model that integrates primary and secondary succession in microbial systems.

  8. U.S. Natural Gas Monthly Supply and Disposition Balance

    U.S. Energy Information Administration (EIA) Indexed Site

    Monthly Supply and Disposition Balance (Billion Cubic Feet) Period: Monthly Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Data Series Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 View History Gross Withdrawals 2,750 2,818 2,744 2,824 2,823 2,669 1973-2016 Marketed Production 2,407 2,456 2,376 2,441 2,448 2,323 1973-2016 NGPL Production, Gaseous Equivalent 144 153 149 151 148 140 1973-2016 Dry Production 2,263 2,303 2,227 2,290

  9. Detailed balance limit of power conversion efficiency for organic photovoltaics

    SciTech Connect (OSTI)

    Seki, Kazuhiko; Furube, Akihiro; Yoshida, Yuji

    2013-12-16

    A fundamental difference between inorganic photovoltaic (IPV) and organic photovoltaic (OPV) cells is that charges are generated at the interface in OPV cells, while free charges can be generated in the bulk in IPV cells. In OPV cells, charge generation involves intrinsic energy losses to dissociate excitons at the interface between the donor and acceptor. By taking into account the energy losses, we show the theoretical limits of the power conversion efficiency set by radiative recombination of the carriers on the basis of the detailed balance relation between radiation from the cell and black-body radiation.

  10. OXALATE MASS BALANCE DURING CHEMICAL CLEANING IN TANK 6F

    SciTech Connect (OSTI)

    Poirier, M.; Fink, S.

    2011-07-22

    The Savannah River Remediation (SRR) is preparing Tank 6F for closure. The first step in preparing the tank for closure is mechanical sludge removal. Following mechanical sludge removal, SRS performed chemical cleaning with oxalic acid to remove the sludge heel. Personnel are currently assessing the effectiveness of the chemical cleaning to determine whether the tank is ready for closure. SRR personnel collected liquid samples during chemical cleaning and submitted them to Savannah River National Laboratory (SRNL) for analysis. Following chemical cleaning, they collected a solid sample (also known as 'process sample') and submitted it to SRNL for analysis. The authors analyzed these samples to assess the effectiveness of the chemical cleaning process. Analysis of the anions showed the measured oxalate removed from Tank 6F to be approximately 50% of the amount added in the oxalic acid. To close the oxalate mass balance, the author collected solid samples, leached them with nitric acid, and measured the concentration of cations and anions in the leachate. Some conclusions from this work are: (1) Approximately 65% of the oxalate added as oxalic acid was removed with the decanted liquid. (2) Approximately 1% of the oxalate (added to the tank as oxalic acid) formed precipitates with compounds such as nickel, manganese, sodium, and iron (II), and was dissolved with nitric acid. (3) As much as 30% of the oxalate may have decomposed forming carbon dioxide. The balance does not fully account for all the oxalate added. The offset represents the combined uncertainty in the analyses and sampling.

  11. Fuzzy-probabilistic calculations of water-balance uncertainty

    SciTech Connect (OSTI)

    Faybishenko, B.

    2009-10-01

    Hydrogeological systems are often characterized by imprecise, vague, inconsistent, incomplete, or subjective information, which may limit the application of conventional stochastic methods in predicting hydrogeologic conditions and associated uncertainty. Instead, redictions and uncertainty analysis can be made using uncertain input parameters expressed as probability boxes, intervals, and fuzzy numbers. The objective of this paper is to present the theory for, and a case study as an application of, the fuzzyprobabilistic approach, ombining probability and possibility theory for simulating soil water balance and assessing associated uncertainty in the components of a simple waterbalance equation. The application of this approach is demonstrated using calculations with the RAMAS Risk Calc code, to ssess the propagation of uncertainty in calculating potential evapotranspiration, actual evapotranspiration, and infiltration-in a case study at the Hanford site, Washington, USA. Propagation of uncertainty into the results of water-balance calculations was evaluated by hanging he types of models of uncertainty incorporated into various input parameters. The results of these fuzzy-probabilistic calculations are compared to the conventional Monte Carlo simulation approach and estimates from field observations at the Hanford site.

  12. The United States Plutonium Balance, 1944-2009 | National Nuclear...

    National Nuclear Security Administration (NNSA)

    as an update to Plutonium: the First 50 Years, which was first released by the U.S. ... Previous Documents Plutonium: The First 50 Years (February 1996, DOEDP-0137) DOE Fact ...

  13. Through the years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    years Early 1960s Researchers at PNL (now called PNNL) developed the standards and devices for setting and measuring radiation doses received by nuclear industry work- ers. Tens of thousands of people, including children, have been mea- sured by whole-body counters since the 1960s to relate their physical content of radioactive materials to sources such as food and water. 1960s PNL formulated the first use of a digital computer for complete process control of a mass spectrometer. Mid-1960s PNL

  14. Oxygenate Supply/Demand Balances in the Short-Term Integrated Forecasting Model (Released in the STEO March 1998)

    Reports and Publications (EIA)

    1998-01-01

    The blending of oxygenates, such as fuel ethanol and methyl tertiary butyl ether (MTBE), into motor gasoline has increased dramatically in the last few years because of the oxygenated and reformulated gasoline programs. Because of the significant role oxygenates now have in petroleum product markets, the Short-Term Integrated Forecasting System (STIFS) was revised to include supply and demand balances for fuel ethanol and MTBE. The STIFS model is used for producing forecasts in the Short-Term Energy Outlook. A review of the historical data sources and forecasting methodology for oxygenate production, imports, inventories, and demand is presented in this report.

  15. ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...

    U.S. Energy Information Administration (EIA) Indexed Site

    2008 " ,"(Megawatts and Percent)" ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

  16. ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...

    U.S. Energy Information Administration (EIA) Indexed Site

    2009 " ,"(Megawatts and Percent)" ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

  17. Projects of the year

    SciTech Connect (OSTI)

    Hansen, T.

    2007-01-15

    The Peabody Hotel, Orlando, Florida was the site of Power Engineering magazine's 2006 Projects of the Year Awards Banquet, which kicked-off the Power-Gen International conference and exhibition. The Best Coal-fired Project was awarded to Tri-State Generation and Transmission Association Inc., owner of Springenville Unit 3. This is a 400 MW pulverized coal plant in Springeville, AZ, sited with two existing coal-fired units. Designed to fire Powder River Basin coal, it has low NOx burners and selective catalytic reduction for NOx control, dry flue gas desulfurization for SO{sub 2} control and a pulse jet baghouse for particulate control. It has a seven-stage feedwater heater and condensers to ensure maximum performance. Progress Energy-Carolinas' Asheville Power Station FGD and SCR Project was awarded the 2006 coal-fired Project Honorable Mention. This plant in Skyland, NC was required to significantly reduce NOx emissions. When completed, the improvements will reduce NOx by 93% compared to 1996 levels and SO{sub 2} by 93% compared to 2001 levels. Awards for best gas-fired, nuclear, and renewable/sustainable energy projects are recorded. The Sasyadko Coal-Mine Methane Cogeneration Plant near Donezk, Ukraine, was given the 2006 Honorable Mention for Best Renewable/Sustainable Energy Project. In November 2004, Ukraine was among 14 nations to launch the Methane to Markets partnership. The award-winning plant is fuelled by methane released during coal extraction. It generates 42 MW of power. 4 photos.

  18. Concurrent Transfers Historical Yearly Peak

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the graph for current year shows the data for the year-to-date peak. Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily...

  19. Planning for Years to Come

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education ...

  20. Surface Energy Balance System (SEBS) Handbook (Technical Report) | SciTech

    Office of Scientific and Technical Information (OSTI)

    Connect Surface Energy Balance System (SEBS) Handbook Citation Details In-Document Search Title: Surface Energy Balance System (SEBS) Handbook A Surface Energy Balance System (SEBS) has been installed collocated with each deployed Eddy Correlation Flux Measurement System (ECOR) at the Atmospheric Radiation Measurement (ARM) Climate Research Facility's Southern Great Plains (SGP) site, North Slope of Alaska (NSA) site, first ARM Mobile Facility (AMF1), second ARM Mobile Facility (AMF2), and

  1. A new load-balancing strategy for the solution of dynamical large-tree

    Office of Scientific and Technical Information (OSTI)

    search problems using a hierarchical approach (Journal Article) | SciTech Connect Journal Article: A new load-balancing strategy for the solution of dynamical large-tree search problems using a hierarchical approach Citation Details In-Document Search Title: A new load-balancing strategy for the solution of dynamical large-tree search problems using a hierarchical approach We describe a new load-balancing strategy, applied here to the protein conformational search problem, for improving the

  2. Energy Balance Bowen Ratio (EBBR) Handbook (Technical Report) | SciTech

    Office of Scientific and Technical Information (OSTI)

    Connect Energy Balance Bowen Ratio (EBBR) Handbook Citation Details In-Document Search Title: Energy Balance Bowen Ratio (EBBR) Handbook The Energy Balance Bowen Ratio (EBBR) system produces 30-minute estimates of the vertical fluxes of sensible and latent heat at the local surface. Flux estimates are calculated from observations of net radiation, soil surface heat flux, and the vertical gradients of temperature and relative humidity (RH). Meteorological data collected by the EBBR are used

  3. Role of Large Balancing Areas In Integrating Solar Generation: Solar Integration Series. 3 of 3 (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2011-05-01

    The third out of a series of three fact sheets describing the role of large balancing areas in integrating solar generation.

  4. Balancing I/Q data in radar range-Doppler images. (Conference...

    Office of Scientific and Technical Information (OSTI)

    Title: Balancing IQ data in radar range-Doppler images. Abstract not provided. Authors: Doerry, Armin Walter Publication Date: 2015-01-01 OSTI Identifier: 1244856 Report ...

  5. Low Temperature Fuel Cell and Electrolyzer Balance-of-Plant Manufactur...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cell and Electrolyzer Balance-of-Plant Manufacturing Needs Low Temperature Fuel Cell ... DC, August 11-12, 2011. PDF icon Low Temperature Fuel Cell and Electrolyzer ...

  6. Combining Balancing Areas' Variability: Impacts on Wind Integration in the Western Interconnection

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; Beuning, S.

    2010-07-01

    This paper investigates the potential impact of balancing area cooperation on a large-scale in the Western Electricity Coordinating Council (WECC).

  7. Acquisition Guide Chapter 1.3- Balanced Scorecard Assessment Program- (March 2004)

    Broader source: Energy.gov [DOE]

    Guiding Principle The Balanced Scorecard program ensures that there is an established and consistent approach utilized by Departmental procurement and purchasing organizations in assessing accomplishments, and managing performance.

  8. Relationship Between Wind Generation and Balancing Energy Market Prices in ERCOT: 2007-2009

    SciTech Connect (OSTI)

    Nicholson, E.; Rogers, J.; Porter, K.

    2010-11-01

    This paper attempts to measure the average marginal effects of wind generation on the balancing-energy market price in ERCOT with the help of econometric analysis.

  9. Seasonality in the Natural Gas Balancing Item: Historical Trends and Corrective Measures

    Reports and Publications (EIA)

    2010-01-01

    This special report examines an underlying cause of the seasonal pattern in the balancing item published in the Natural Gas Monthly.

  10. Aggregate Transfers Historical Yearly Peak

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transfers Historical Yearly Peak Aggregate Transfers Historical Yearly Peak These plots show the yearly peak days from 2000 to the present. BE CAREFUL because the graphs are autoscaling - check the scales on each axis before you compare graphs. Note that the graph for current year shows the data for the year-to-date peak. Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate

  11. Concurrent Transfers Historical Yearly Peak

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transfers Historical Yearly Peak Concurrent Transfers Historical Yearly Peak These plots show the yearly peak days from 2000 to present. BE CAREFUL because the graphs are autoscaling - check the scales on each axis before you compare graphs. Note that the graph for current year shows the data for the year-to-date peak. Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage

  12. YEAR 2 BIOMASS UTILIZATION

    SciTech Connect (OSTI)

    Christopher J. Zygarlicke

    2004-11-01

    This Energy & Environmental Research Center (EERC) Year 2 Biomass Utilization Final Technical Report summarizes multiple projects in biopower or bioenergy, transportation biofuels, and bioproducts. A prototype of a novel advanced power system, termed the high-temperature air furnace (HITAF), was tested for performance while converting biomass and coal blends to energy. Three biomass fuels--wood residue or hog fuel, corn stover, and switchgrass--and Wyoming subbituminous coal were acquired for combustion tests in the 3-million-Btu/hr system. Blend levels were 20% biomass--80% coal on a heat basis. Hog fuel was prepared for the upcoming combustion test by air-drying and processing through a hammer mill and screen. A K-Tron biomass feeder capable of operating in both gravimetric and volumetric modes was selected as the HITAF feed system. Two oxide dispersion-strengthened (ODS) alloys that would be used in the HITAF high-temperature heat exchanger were tested for slag corrosion rates. An alumina layer formed on one particular alloy, which was more corrosion-resistant than a chromia layer that formed on the other alloy. Research activities were completed in the development of an atmospheric pressure, fluidized-bed pyrolysis-type system called the controlled spontaneous reactor (CSR), which is used to process and condition biomass. Tree trimmings were physically and chemically altered by the CSR process, resulting in a fuel that was very suitable for feeding into a coal combustion or gasification system with little or no feed system modifications required. Experimental procedures were successful for producing hydrogen from biomass using the bacteria Thermotoga, a deep-ocean thermal vent organism. Analytical procedures for hydrogen were evaluated, a gas chromatography (GC) method was derived for measuring hydrogen yields, and adaptation culturing and protocols for mutagenesis were initiated to better develop strains that can use biomass cellulose. Fly ash derived from cofiring coal with waste paper, sunflower hulls, and wood waste showed a broad spectrum of chemical and physical characteristics, according to American Society for Testing and Materials (ASTM) C618 procedures. Higher-than-normal levels of magnesium, sodium, and potassium oxide were observed for the biomass-coal fly ash, which may impact utilization in cement replacement in concrete under ASTM requirements. Other niche markets for biomass-derived fly ash were explored. Research was conducted to develop/optimize a catalytic partial oxidation-based concept for a simple, low-cost fuel processor (reformer). Work progressed to evaluate the effects of temperature and denaturant on ethanol catalytic partial oxidation. A catalyst was isolated that had a yield of 24 mole percent, with catalyst coking limited to less than 15% over a period of 2 hours. In biodiesel research, conversion of vegetable oils to biodiesel using an alternative alkaline catalyst was demonstrated without the need for subsequent water washing. In work related to biorefinery technologies, a continuous-flow reactor was used to react ethanol with lactic acid prepared from an ammonium lactate concentrate produced in fermentations conducted at the EERC. Good yields of ester were obtained even though the concentration of lactic acid in the feed was low with respect to the amount of water present. Esterification gave lower yields of ester, owing to the lowered lactic acid content of the feed. All lactic acid fermentation from amylose hydrolysate test trials was completed. Management activities included a decision to extend several projects to December 31, 2003, because of delays in receiving biomass feedstocks for testing and acquisition of commercial matching funds. In strategic studies, methods for producing acetate esters for high-value fibers, fuel additives, solvents, and chemical intermediates were discussed with several commercial entities. Commercial industries have an interest in efficient biomass gasification designs but are waiting for economic incentives. Utility, biorefinery, pulp and paper, or other industries are interested in lignin as a potential fuel or feedstock but need more information on properties.

  13. 60 Years of Computing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    60 Years of Computing 60 Years of Computing

  14. Oxalate Mass Balance During Chemical Cleaning in Tank 5F

    SciTech Connect (OSTI)

    Poirier, M.; Fink, S.

    2011-07-08

    The Savannah River Site (SRS) is preparing Tank 5F for closure. The first step in preparing the tank for closure is mechanical sludge removal. Following mechanical sludge removal, SRS performed chemical cleaning with oxalic acid to remove the sludge heel. Personnel are currently assessing the effectiveness of the chemical cleaning to determine whether the tank is ready for closure. SRS personnel collected liquid samples during chemical cleaning and submitted them to Savannah River National Laboratory (SRNL) for analysis. Following chemical cleaning, they collected a solid sample (also known as 'process sample') and submitted it to SRNL for analysis. The authors analyzed these samples to assess the effectiveness of the chemical cleaning process. Analysis of the anions showed the measured oxalate removed from Tank 5F to be approximately 50% of the amount added in the oxalic acid. To close the oxalate mass balance, the author collected solid samples, leached them with nitric acid, and measured the concentration of cations and anions in the leachate.

  15. Large-amplitude solitons in gravitationally balanced quantum plasmas

    SciTech Connect (OSTI)

    Akbari-Moghanjoughi, M.

    2014-08-15

    Using the quantum fluid model for self-gravitating quantum plasmas with the Bernoulli pseudopotential method and taking into account the relativistic degeneracy effect, it is shown that gravity-induced large-amplitude density rarefaction solitons can exist in gravitationally balanced quantum plasmas. These nonlinear solitons are generated due to the force imbalance between the gravity and the quantum fluid pressure via local density perturbations, similar to that on shallow waters. It is found that both the fluid mass-density and the atomic-number of the constituent ions have significant effect on the amplitude and width of these solitonic profiles. Existence of a large-scale gravity-induced solitonic activities on neutron-star surface, for instance, can be a possible explanation for the recently proposed resonant shattering mechanism [D. Tsang et al., Phys. Rev. Lett. 108, 011102 (2012)] causing the intense short gamma ray burst phenomenon, in which release of ?10{sup 46}10{sup 47} ergs would be possible from the surface. The resonant shattering of the crust in a neutron star has been previously attributed to the crust-core interface mode and the tidal surface tensions. We believe that current model can be a more natural explanation for the energy liberation by solitonic activities on the neutron star surfaces, without a requirement for external mergers like other neutron stars or black holes for the crustal shatter.

  16. Smart Meters Help Balance Energy Consumption at Solar Decathlon

    Broader source: Energy.gov [DOE]

    Clouds, rain, thunderstorms… at Solar Decathlon Village? Oh my, you may say. But less-than-ideal weather conditions are no match for this year's teams, thanks to smart grid technology that is helping them monitor their energy consumption.

  17. Balancing Autonomy and Utilization of Solar Power and Battery Storage for Demand Based Microgrids.

    SciTech Connect (OSTI)

    Lawder, Matthew T.; Viswanathan, Vilayanur V.; Subramanian, Venkat R.

    2015-04-01

    The growth of intermittent solar power has developed a need for energy storage systems in order to decouple generation and supply of energy. Microgrid (MG) systems comprising of solar arrays with battery energy storage studied in this paper desire high levels of autonomy, seeking to meet desired demand at all times. Large energy storage capacity is required for high levels of autonomy, but much of this expensive capacity goes unused for a majority of the year due to seasonal fluctuations of solar generation. In this paper, a model-based study of MGs comprised of solar generation and battery storage shows the relationship between system autonomy and battery utilization applied to multiple demand cases using a single particle battery model (SPM). The SPM allows for more accurate state-of-charge and utilization estimation of the battery than previous studies of renewably powered systems that have used empirical models. The increased accuracy of battery state estimation produces a better assessment of system performance. Battery utilization will depend on the amount of variation in solar insolation as well as the type of demand required by the MG. Consumers must balance autonomy and desired battery utilization of a system within the needs of their grid.

  18. 2013 Director's New Year Address

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    has in store for the ALS. An immediate answer is - a celebration - as the ALS marks its 20th year of operation. We'll spend some time this year looking back at what we've...

  19. Microsoft Word - The Oppenheimer Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oppenheimer Years 1943-1945 At 5:29:45 am MWT on July 16, 1945, the world's first atomic ... He graduated summa cum laude three years later. Oppenheimer wanted to attend graduate ...

  20. WIPP_Marks_12_Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Marks 12 Years of Operations CARLSBAD, N.M., March 28, 2011 - On Saturday, March 26, 2011, ... It has now been 12 years since WIPP received its first shipment of transuranic (TRU) ...

  1. Year's End 2012 | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Year's End 2012 Year's End 2012 September 27, 2012 Throughout history, civilizations have developed their own calendars and commemorated the start of a New Year. Modern civilizations often have two calendars, the second being the financial calendar. In the United Kingdom and Japan the financial year starts on April 1. In the United States, the relevant date for the federal government is Oct. 1 - Monday, next week. Working in a national laboratory, our links to the national budget cycle are

  2. Study of a double bubbler for material balance in liquids

    SciTech Connect (OSTI)

    Hugues Lambert

    2013-09-01

    The objective of this project was to determine the potential of a double bubbler to measure density and fluid level of the molten salt contained in an electrorefiner. Such in-situ real-time measurements can provide key information for material balances in the pyroprocessing of the nuclear spent fuel. This theoretical study showed this technique has a lot of promise. Four different experiments were designed and performed. The first three experiments studied the influence of a variety of factors such as depth difference between the two tubes, gas flow rate, the radius of the tubes and determining the best operating conditions. The last experiment purpose was to determine the precision and accuracy of the apparatus during specific conditions. The elected operating conditions for the characterization of the system were a difference of depth of 25 cm and a flow rate of 55 ml/min in each tube. The measured densities were between 1,000 g/l and 1,400g/l and the level between 34cm and 40 cm. The depth difference between the tubes is critical, the larger, the better. The experiments showed that the flow rate should be the same in each tube. The concordances with theoretical predictions were very good. The density precision was very satisfying (spread<0.1%) and the accuracy was about 1%. For the level determination, the precision was also very satisfying (spread<0.1%), but the accuracy was about 3%. However, those two biases could be corrected with calibration curves. In addition to the aqueous systems studied in the present work, future work will focus on examining the behavior of the double bubbler instrumentation in molten salt systems. The two main challenges which were identified in this work are the effect of the temperature and the variation of the superficial tension.

  3. Transfer Activity Historical Yearly Peak

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Activity Historical Yearly Peak Transfer Activity Historical Yearly Peak The plots below show the yearly peak days from 2000 to the present. BE CAREFUL because the graphs are autoscaling - check the scales on each axis before you compare graphs. Note that the graph for the current year shows the data for the year-to-date peak. Transfers Started/In Progress Transfers Started/In Progress Transfers Started/In Progress Transfers Started/In Progress Transfers Started/In Progress Transfers Started/In

  4. Approach to IAEA material-balance verification with intermittent inspection at the Portsmouth Gas Centrifuge Enrichment Plant

    SciTech Connect (OSTI)

    Gordon, D.M.; Sanborn, J.B.

    1984-05-18

    This paper describes a potential approach by which the International Atomic Energy Agency (IAEA) might verify the nuclear-material balance at the Portsmouth Gas Centrifuge Enrichment Plant (GCEP) for the circumstance in which the IAEA inspections occur on an intermittent basis. The verification approach is a variation of the standard IAEA attributes/variables measurement-verification method. This alternative approach is useful and applicable at the Portsmouth GCEP, which will ship all its product and tails UF/sub 6/ to United States facilities not eligible for IAEA safeguards. The paper reviews some of the relevant results of the Hexapartite Safeguards Project (HSP), describes the standard IAEA material-balance-verification approach for bulk-handling facilities, and provides the procedures to be followed in handling and processing UF/sub 6/ cylinders at the Portsmouth GCEP. The paper then discusses the assumptions made in the approach, and derives a formula for the probability with which the IAEA could detect the diversion of a significant quantity of uranium (75 kg of U-235 in depleted, normal, and low-enriched uranium) if this method were applied. The paper also provides numerical examples of IAEA detection probability should the operator divert uranium from the feed, product, or tails streams for the Portsmouth GCEP with a capacity of 1100 tonnes of separative work per year.

  5. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 21 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 5 Hispanic Female (H F) 3 White Male (W M) 26 White Female (W ...

  6. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 46 White Female (W ...

  7. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 4 Asian American Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 68 White Female (W ...

  8. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 3 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 13 Hispanic Female (H F) 10 White Male (W M) 43 White Female ...

  9. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 12 Hispanic Female (H F) 12 White Male (W M) 34 White Female ...

  10. YEAR

    National Nuclear Security Administration (NNSA)

    White Male (W M) 13 White Female (W F) 5 DIVERSITY TOTAL WORKFORCE GENDER Savannah River ... ELIGIBLE TO RETIRE IMMEDIATELY 5 ELIGIBLE TO RETIRE IN 5 YRS BY 2019 9 Savannah River ...

  11. YEAR

    National Nuclear Security Administration (NNSA)

    2012 2013 SES 2 1 -50.00% EJEK 10 9 -10.00% EN 04 27 24 -11.11% NN (Engineering) 28 24 -14.29% NQ (ProfTechAdmin) 31 29 -6.45% NU (TechAdmin Support) 4...

  12. YEAR

    National Nuclear Security Administration (NNSA)

    SES 1 2 100.00% EJEK 2 2 0.00% EN 04 1 1 0.00% EN 03 1 0 -100.00% NN (Engineering) 12 11 -8.33% NQ (ProfTechAdmin) 216 218 0.93% NU (TechAdmin Support) 2...

  13. YEAR

    National Nuclear Security Administration (NNSA)

    2013 SES 2 2 0.00% EJEK 7 8 14.29% EN 04 11 11 0.00% EN 03 1 1 0.00% NN (Engineering) 23 24 4.35% NQ (ProfTechAdmin) 35 32 -8.57% NU (TechAdmin Support) 3 2...

  14. YEAR

    National Nuclear Security Administration (NNSA)

    1.6% 6.6% 0.7% 17.5% 49.7% 2.7% 13.4% 0.1% 0.1% 0.1% Pay Plan Males 66.5% Females 33.5% Gender AIAN M AIAN F AA M AA F AAPI M AAPI F H M H F W M W F 1.1% 1.0% 3.7% 5.8% 2.6% 1.0%...

  15. Evaluation of Production Cost Savings from Consolidation of Balancing Authorities in the US Western Interconnection under High Wind and Solar Penetration

    SciTech Connect (OSTI)

    Nguyen, Tony B.; Samaan, Nader A.; Jin, Chunlian

    2014-12-24

    This paper introduces a comprehensive analysis to quantify the potential savings in production cost due to consolidation of 32 US western interconnection Balancing Authorities (BAs). Three simulation scenarios are developed: current Western Electricity Coordinating Council (WECC) BAs structure, full copper-sheet consolidation, and full consolidation with transmission congestion considered. The study uses WECC Transmission Expansion Planning Policy Committee (TEPPC) model that was developed for the year 2020. The model assumes 8% wind and 3% solar energy penetration as percentage of total WECC demand in 2020. Sensitivity analyses are carried out to assess the impact of transmission hurdle rates between WECC BAs on potential benefits. The study shows savings that ranges from $400 Million (2.4% of total one year production cost) to $600 Million (3.2%) per year in thermal units production cost due to consolidation can be achieved. The copper sheet consolidation scenario shows an extra savings of $240 Million (1.4%) per year.

  16. PADUCAH 2015 YEAR IN REVIEW

    Energy Savers [EERE]

    PADUCAH 2015 YEAR IN REVIEW "2015 has been a pivotal year at the Paducah Site. Now that we have successfully transitioned the gaseous diffusion plant from NRC oversight to DOE oversight and DOE has the entire site back for the first time in almost 20 years, major deactivation activities are under way to prepare the site for future decontamination and decommissioning. We are fortunate to have a highly skilled federal and contractor workforce in place to safely and successfully continue this

  17. Oak Ridge National Laboratory [ORNL] Review, Vol. 25, Nos. 3 and 4, 1992 [The First Fifty Years

    DOE R&D Accomplishments [OSTI]

    Krause, C.(ed.)

    1992-01-01

    In observation of the 50th anniversary of Oak Ridge National Laboratory, this special double issue of the Review contains a history of the Laboratory, complete with photographs, drawings, and short accompanying articles. Table of contents include: Wartime Laboratory; High-flux Years; Accelerating Projects; Olympian Feats; Balancing Act; Responding to Social Needs; Energy Technologies; Diversity and Sharing; Global Outreach; Epilogue

  18. Extreme Balance of System Hardware Cost Reduction (BOS-X) Funding Opportunity

    Broader source: Energy.gov [DOE]

    Under the Extreme Balance of System Hardware Cost Reduction (BOS-X) program, DOE is funding new components and system designs to overcome scientific, technological, and engineering barriers to...

  19. Fact #673: May 2, 2011 U.S. Trade Balance for Transportation Vehicles

    Broader source: Energy.gov [DOE]

    Motor vehicles, aircraft, ships, and rail locomotives are imported to and exported from the U.S. The trade balance (exports minus imports) shows that the U.S. imports more motor vehicles and parts...

  20. NETL: The First 100 Years

    SciTech Connect (OSTI)

    2015-07-21

    The National Energy Technology Laboratory celebrates 100 years of innovative energy technology development. NETL has been a leader in energy technology development. This video takes a look back at the many accomplishments over the past 100 years. These advances benefit the American people, enhance our nation's energy security and protect our natural resources.

  1. Ideal balance of work, play makes outdoor enthusiast's James Miller life

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    enviable Ideal balance of work, play makes outdoor enthusiast's life enviable Ideal balance of work, play makes outdoor enthusiast's James Miller life enviable Nuclear engineer graduate research assistant gets valuable experience while taking advantage of local outdoor recreational activities. August 2, 2012 James Miller Miller first came to the Lab in 2006 as a summer student. His college advisor, a former Laboratory employee, found him an internship through the student programs office.

  2. Dynamic load balancing algorithm for molecular dynamics based on Voronoi cells domain decompositions

    SciTech Connect (OSTI)

    Fattebert, J.-L.; Richards, D.F.; Glosli, J.N.

    2012-12-01

    We present a new algorithm for automatic parallel load balancing in classical molecular dynamics. It assumes a spatial domain decomposition of particles into Voronoi cells. It is a gradient method which attempts to minimize a cost function by displacing Voronoi sites associated with each processor/sub-domain along steepest descent directions. Excellent load balance has been obtained for quasi-2D and 3D practical applications, with up to 440106 particles on 65,536 MPI tasks.

  3. Ultrafast kinetics subsequent to shock compression in an oxygen-balanced

    Office of Scientific and Technical Information (OSTI)

    mixture of nitromethane and hydrogen peroxide (Journal Article) | SciTech Connect Journal Article: Ultrafast kinetics subsequent to shock compression in an oxygen-balanced mixture of nitromethane and hydrogen peroxide Citation Details In-Document Search Title: Ultrafast kinetics subsequent to shock compression in an oxygen-balanced mixture of nitromethane and hydrogen peroxide Authors: Armstrong, M R ; Zaug, J M ; Grant, C D ; Crowhurst, J C ; Bastea, S Publication Date: 2014-03-03 OSTI

  4. Balance of Plant Needs and Integration of Stack Components for Stationary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power and CHP Applications | Department of Energy Needs and Integration of Stack Components for Stationary Power and CHP Applications Balance of Plant Needs and Integration of Stack Components for Stationary Power and CHP Applications Presentation on Balance of Plant Needs and Integration of Stack Components for Stationary Power and CHP Applications for Fuel Cell Pre-solicitation Workshop March 10, 2010 PDF icon fuelcell_pre-solicitation_wkshop_mar10_ainscough.pdf More Documents &

  5. OPEC and lower oil prices: Impacts on production capacity, export refining, domestic demand and trade balances

    SciTech Connect (OSTI)

    Fesharaki, F.; Fridley, D.; Isaak, D.; Totto, L.; Wilson, T.

    1988-12-01

    The East-West Center has received a research grant from the US Department of Energy's Office of Policy, Planning, and Analysis to study the impact of lower oil prices on OPEC production capacity, on export refineries, and petroleum trade. The project was later extended to include balance-of-payments scenarios and impacts on OPEC domestic demand. As the study progressed, a number of preliminary presentations were made at the US Department of Energy in order to receive feedback from DOE officials and to refine the focus of our analysis. During one of the presentations on June 4, 1987, the then Director of Division of Oil and Gas, John Stanley-Miller, advised us to focus our work on the Persian Gulf countries, since these countries were of special interest to the United States Government. Since then, our team has visited Iran, the United Arab Emirates, and Saudi Arabia and obtained detailed information from other countries. The political turmoil in the Gulf, the Iran/Iraq war, and the active US military presence have all worked to delay the final submission of our report. Even in countries where the United States has close ties, access to information has been difficult. In most countries, even mundane information on petroleum issues are treated as national secrets. As a result of these difficulties, we requested a one-year no cost extension to the grant and submitted an Interim Report in May 1988. As part of our grant extension request, we proposed to undertake additional tasks which appear in this report. 20 figs., 21 tabs.

  6. Visualizing Twenty Years of Applications

    SciTech Connect (OSTI)

    Potel, Mike; Wong, Pak C.

    2014-11-01

    This issue of IEEE Computer Graphics and Applications marks the 20th anniversary of the Applications department as a regular feature of the magazine. We thought it might be interesting to look back at the 20 years of Applications department articles to assess its evolution over that time. By aggregating all twenty years of articles and applying a little statistical and visual analytics, we’ve uncovered some interesting characteristics and trends we thought we’d share to mark this 20 year milestone.

  7. 2014 Year-in-Review

    Energy Savers [EERE]

    4 Year-in-Review i 2014 YIR May 2015 Year-in-Review: 2014 Energy Infrastructure Events and Expansions Office of Electricity Delivery and Energy Reliability U.S. Department of Energy For Further Information This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and Thomas Roston, Acting Deputy Assistant Secretary. Specific questions about this report may be directed to John Ostrich, Office of Electricity

  8. PORTSMOUTH 2015 YEAR IN REVIEW

    Energy Savers [EERE]

    PORTSMOUTH 2015 YEAR IN REVIEW At the Portsmouth site this year, it was critical to have alignment among regulatory decisions and agreements, deactivation, shipping, and preliminary work on the on-site waste disposal facility. In 2015, we made significant progress in all of those areas. Our workforce performed admirably in 2015 and we look forward to continuing our momentum in 2016." - Dr. Vincent Adams, Portsmouth Site Director, DOE Portsmouth/Paducah Project Office KEY ACCOMPLISHMENTS 

  9. Draft dry year tools (generation/planning)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA White Book Dry Year Tools Firstgov Dry Year Tools November 9, 2006 - Final Dry Year Guide: The Final Dry Year Guide (PDF, 5 pages, 44 kb) and Figure 1 - Dry Year Strategy (PDF,...

  10. LNG to the year 2000

    SciTech Connect (OSTI)

    Davenport, S.T.

    1984-04-01

    By 2000, about 190 MM metric-tpy of LNG will be moving in world trade, with Asia-Pacific as the dominant producer By the year 2000, approximately 190 million metric tons per year of LNG will be moving in worldwide trade. Production of LNG will be spread throughout most of the world, with Asia-Pacific as the dominant producer. LNG will be delivered only to the heavily industrialized areas of North America, Europe and Asia-Pacific. The success of any LNG project will be dependent on its individual economics, market needs, financial planning, and governmental permit processes. We hope industry will be able to put together the LNG projects required to meet the quanitities of production forecast here for the year 2000.

  11. Two Year Difference | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Two Year Difference Two Year Difference May 19, 2014 On May 19, 2012, we held an Open House; on Saturday, May 17, 2014, we held an Open House; it's a habit. And what a day we had on Saturday! The weather was perfect. The extent to which we are able to open the lab is a major surprise for many visitors. They arrive with the expectation that maybe we open one building with displays. Instead, they find themselves getting into the accelerator, the Central Helium Liquefier, and ALL the experimental

  12. Calendar Year Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Calendar Year Reports Calendar Year Reports Audit, Inspection and Other Reports The majority of Office of Inspector General reports are public. Certain reports, however, are not public as they contain information that is protected by the Freedom of Information Act (FOIA) and Privacy Act. The provisions of these acts determine the availability of these reports. Calendar Year 2016 Calendar Year 2015 Calendar Year 2014 Calendar Year 2013 Calendar Year 2012 Calendar Year 2011 Calendar Year 2010

  13. FEMP Year in Review 2009

    SciTech Connect (OSTI)

    2009-12-01

    In 2009, the Federal Energy Management Program (FEMP)undertook an ambitious reorganization of its program structure to be more responsive to the needs of its Federal agency customers. In this Year in Review 2009, you will learn more about FEMP achievements under its new program areas.

  14. Nuclear Materials Focus Area Fiscal Year 2002 Mid Year Review

    SciTech Connect (OSTI)

    Thiel, Elizabeth Chilcote

    2002-05-01

    The Nuclear Materials Focus Area (NMFA) held its annual mid-year review on February 12 and 14, 2002, in Santa Fe, New Mexico. The purpose of this review was to examine both the technical aspects and the programmatic aspects of its technology development program. The focus area activities were reviewed by a panel consisting of personnel representing the end users of the technologies, and technical experts in nuclear materials. This year's review was somewhat different than in the past, as the stress was on how well the various projects being managed through the NMFA aligned with the two thrust areas and nine key goals and priorities recently issued by the Deputy Assistant Secretary for DOE's Office of Environmental Management (EM).

  15. Nuclear Materials Focus Area Fiscal Year 2002 Mid Year Review

    SciTech Connect (OSTI)

    Thiel, E.C.; Fuhrman, P.W.

    2002-05-30

    The Nuclear Materials Focus Area (NMFA) held its annual mid-year review on February 12 and 14, 2002, in Santa Fe, New Mexico. The purpose of this review was to examine both the technical aspects and the programmatic aspects of its technology development program. The focus area activities were reviewed by a panel consisting of personnel representing the end users of the technologies, and technical experts in nuclear materials. This year's review was somewhat different than in the past, as the stress was on how well the various projects being managed through the NMFA aligned with the two thrust areas and nine key goals and priorities recently issued by the Deputy Assistant Secretary for DOE's Office of Environmental Management (EM).

  16. DWPF coupled feed flowsheet material balance with batch one sludge and copper nitrate catalyst

    SciTech Connect (OSTI)

    Choi, A.S.

    1993-09-28

    The SRTC has formally transmitted a recommendation to DWPF to replace copper formate with copper nitrate as the catalyst form during precipitate hydrolysis [1]. The SRTC was subsequently requested to formally document the technical bases for the recommendation. A memorandum was issued on August 23, 1993 detailing the activities (and responsible individuals) necessary to address the impact of this change in catalyst form on process compatibility, safety, processibility environmental impact and product glass quality [2]. One of the activities identified was the preparation of a material balance in which copper nitrate is substituted for copper formate and the identification of key comparisons between this material balance and the current Batch 1 sludge -- Late Wash material balance [3].

  17. Dynamic Analysis of Wind Turbine Planetary Gears Using an Extended Harmonic Balance Approach: Preprint

    SciTech Connect (OSTI)

    Guo, Y.; Keller, J.; Parker, R. G.

    2012-06-01

    The dynamics of wind turbine planetary gears with gravity effects are investigated using an extended harmonic balance method that extends established harmonic balance formulations to include simultaneous internal and external excitations. The extended harmonic balance method with arc-length continuation and Floquet theory is applied to a lumped-parameter planetary gear model including gravity, fluctuating mesh stiffness, bearing clearance, and nonlinear tooth contact to obtain the planetary gear dynamic response. The calculated responses compare well with time domain integrated mathematical models and experimental results. Gravity is a fundamental vibration source in wind turbine planetary gears and plays an important role in system dynamics, causing hardening effects induced by tooth wedging and bearing-raceway contacts. Bearing clearance significantly reduces the lowest resonant frequencies of translational modes. Gravity and bearing clearance together lowers the speed at which tooth wedging occurs lower than the resonant frequency.

  18. Verification Of Energy Balance In The Ansys V5.4 Thermal Calculations

    SciTech Connect (OSTI)

    H. Marr; M.J. Anderson

    2001-02-08

    The objective of this calculation is to verify the energy balance of the thermal calculations analyzed by ANSYS Version (V) 5.4 solver (see Section 4). The scope of this calculation is limited to calculating the energy balance of a two-dimensional repository thermal representation using the temperatures obtained from ANSYS V5.4. The procedure, AP-3.124, Calculations (Ref. 3), and the Technical Work Plan for: Waste Package Design Description for LA (Ref. 2) are used to develop this calculation. The associated activity is the development of engineering evaluations to support the Licensing Application design activities.

  19. A Framework for Load Balancing of Tensor Contraction Expressions via Dynamic Task Partitioning

    SciTech Connect (OSTI)

    Lai, Pai-Wei; Stock, Kevin; Rajbhandari, Samyam; Krishnamoorthy, Sriram; Sadayappan, Ponnuswamy

    2013-11-17

    In this paper, we introduce the Dynamic Load-balanced Tensor Contractions (DLTC), a domain-specific library for efficient task parallel execution of tensor contraction expressions, a class of computation encountered in quantum chemistry and physics. Our framework decomposes each contraction into smaller unit of tasks, represented by an abstraction referred to as iterators. We exploit an extra level of parallelism by having tasks across independent contractions executed concurrently through a dynamic load balancing run- time. We demonstrate the improved performance, scalability, and flexibility for the computation of tensor contraction expressions on parallel computers using examples from coupled cluster methods.

  20. Minimizing Wind Power Producer's Balancing Costs Using Electrochemical Energy Storage: Preprint

    SciTech Connect (OSTI)

    Miettinen, J.; Tikka, V.; Lassila, J.; Partanen, J.; Hodge, B. M.

    2014-08-01

    This paper examines how electrochemical energy storage can be used to decrease the balancing costs of a wind power producer in the Nordic market. Because electrochemical energy storage is developing in both technological and financial terms, a sensitivity analysis was carried out for the most important variables in the wind-storage hybrid system. The system was studied from a wind power producer's point of view. The main result is that there are no technical limitations to using storage for reducing the balancing costs. However, in terms of economic feasibility, installing hybrid wind-storage systems such as the one studied in this paper faces challenges in both the short and long terms.

  1. Evaluating the Impact of Solar Generation on Balancing Requirements in Southern Nevada System

    SciTech Connect (OSTI)

    Ma, Jian; Lu, Shuai; Etingov, Pavel V.; Makarov, Yuri V.

    2012-07-26

    AbstractIn this paper, the impacts of solar photovoltaic (PV) generation on balancing requirements including regulation and load following in the Southern Nevada balancing area are analyzed. The methodology is based on the swinging door algorithm and a probability box method developed by PNNL. The regulation and load following signals are mimicking the systems scheduling and real-time dispatch processes. Load, solar PV generation and distributed PV generation (DG) data are used in the simulation. Different levels of solar PV generation and DG penetration profiles are used in the study. Sensitivity of the regulation requirements with respect to real-time solar PV generation forecast errors is analyzed.

  2. Balancing Cost and Risk: The Treatment of Renewable Energy inWestern Utility Resource Plans

    SciTech Connect (OSTI)

    Wiser, Ryan; Bolinger, Mark

    2005-09-01

    Markets for renewable electricity have grown significantly in recent years, motivated in part by federal tax incentives and in part by state renewables portfolio standards and renewable energy funds. State renewables portfolio standards, for example, motivated approximately 45% of the 4,300 MW of wind power installed in the U.S. from 2001 through 2004, while renewable energy funds supported an additional 15% of these installations. Despite the importance of these state policies, a less widely recognized driver for renewable energy market growth is poised to also play an important role in the coming years: utility integrated resource planning (IRP). Formal resource planning processes have re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, recent resource plans contemplate a significant amount of renewable energy additions. These planned additions - primarily coming from wind power - are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. The treatment of renewable energy in utility resource plans is not uniform, however. Assumptions about the direct and indirect costs of renewable resources, as well as resource availability, differ, as do approaches to incorporating such resources into the candidate portfolios that are analyzed in utility IRPs. The treatment of natural gas price risk, as well as the risk of future environmental regulations, also varies substantially. How utilities balance expected portfolio cost versus risk in selecting a preferred portfolio also differs. Each of these variables may have a substantial effect on the degree to which renewable energy contributes to the preferred portfolio of each utility IRP. This article, which is based on a longer report from Berkeley Lab, examines how twelve western utilities - Avista, Idaho Power, NorthWestern Energy (NorthWestern or NWE), Portland General Electric (PGE), Puget Sound Energy (PSE), PacifiCorp, Public Service Company of Colorado (PSCo), Nevada Power, Sierra Pacific, Pacific Gas & Electric (PG&E), Southern California Edison (SCE), and San Diego Gas & Electric (SDG&E) - treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. In reviewing these plans, our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to suggest possible improvements to methods used to evaluate renewable energy as a resource option. This article begins with a discussion of the planned renewable energy additions called for by the twelve utilities in our sample, followed by an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.

  3. Fiscal Year 2012 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2012-11-01

    This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  4. Fiscal Year 2013 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2013-11-01

    This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  5. The Role of Large Balancing Areas In Integrating Solar Generation: Solar Integration Series. 3 of 3 (Brochure)

    SciTech Connect (OSTI)

    Solar Energy Technologies Program

    2011-05-03

    The third out of a series of three fact sheets describing the role of large balancing areas in integrating solar generation.

  6. National Assessment of Energy Storage for Grid Balancing and Arbitrage: Phase 1, WECC

    SciTech Connect (OSTI)

    Kintner-Meyer, Michael CW; Balducci, Patrick J.; Colella, Whitney G.; Elizondo, Marcelo A.; Jin, Chunlian; Nguyen, Tony B.; Viswanathan, Vilayanur V.; Zhang, Yu

    2012-06-01

    To examine the role that energy storage could play in mitigating the impacts of the stochastic variability of wind generation on regional grid operation, the Pacific Northwest National Laboratory (PNNL) examined a hypothetical 2020 grid scenario in which additional wind generation capacity is built to meet renewable portfolio standard targets in the Western Interconnection. PNNL developed a stochastic model for estimating the balancing requirements using historical wind statistics and forecasting error, a detailed engineering model to analyze the dispatch of energy storage and fast-ramping generation devices for estimating size requirements of energy storage and generation systems for meeting new balancing requirements, and financial models for estimating the life-cycle cost of storage and generation systems in addressing the future balancing requirements for sub-regions in the Western Interconnection. Evaluated technologies include combustion turbines, sodium sulfur (Na-S) batteries, lithium ion batteries, pumped-hydro energy storage, compressed air energy storage, flywheels, redox flow batteries, and demand response. Distinct power and energy capacity requirements were estimated for each technology option, and battery size was optimized to minimize costs. Modeling results indicate that in a future power grid with high-penetration of renewables, the most cost competitive technologies for meeting balancing requirements include Na-S batteries and flywheels.

  7. An Evaluation of the HVAC Load Potential for Providing Load Balancing Service

    SciTech Connect (OSTI)

    Lu, Ning

    2012-09-30

    This paper investigates the potential of providing aggregated intra-hour load balancing services using heating, ventilating, and air-conditioning (HVAC) systems. A direct-load control algorithm is presented. A temperature-priority-list method is used to dispatch the HVAC loads optimally to maintain consumer-desired indoor temperatures and load diversity. Realistic intra-hour load balancing signals were used to evaluate the operational characteristics of the HVAC load under different outdoor temperature profiles and different indoor temperature settings. The number of HVAC units needed is also investigated. Modeling results suggest that the number of HVACs needed to provide a {+-}1-MW load balancing service 24 hours a day varies significantly with baseline settings, high and low temperature settings, and the outdoor temperatures. The results demonstrate that the intra-hour load balancing service provided by HVAC loads meet the performance requirements and can become a major source of revenue for load-serving entities where the smart grid infrastructure enables direct load control over the HAVC loads.

  8. Project W-340 long reach arm retrieval system balance of plant instrumentation workshop engineering study

    SciTech Connect (OSTI)

    Schneider, T.C.

    1994-01-01

    This engineering study documents the results of a workshop held to resolve Issue No. 26 generated at a Arm Based Retrieval Functional Analysis Value Engineering Session. The issue deals with the scope of the Balance of Plant Instrumentation needs for the LRARS.

  9. Balanced optical-microwave phase detector for sub-femtosecond optical-RF synchronization

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Peng, Michael Y.; Kalaydzhyan, Aram; Krtner, Franz X.

    2014-10-23

    We demonstrate that balanced optical-microwave phase detectors (BOMPD) are capable of optical-RF synchronization with sub-femtosecond residual timing jitter for large-scale timing distribution systems. RF-to-optical synchronization is achieved with a long-term stability of moresuppression ratio with potential improvement via DC offset adjustment.less

  10. Twenty Years of Clean Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Twenty Years of Clean Energy For more information contact: George Douglas (303) 275-4096 e-mail: george_douglas@nrel.gov Golden, Colo., July 3, 1997--A doctor stores a life-saving vaccine in a solar-powered refrigerator in a remote Brazilian village, hundreds of miles from the nearest power line. Turbines in California harness the power of the wind to produce economically competitive electricity without producing pollution. Instead of fueling a forest fire, tinder-dry fallen timber littering the

  11. Fiscal Year 2010 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom; Mike Lewis

    2010-11-01

    This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

  12. Fiscal Year 2009 Revegetation Assessment

    SciTech Connect (OSTI)

    Michael Lewis

    2009-10-01

    This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Recommendation(s) for each site.

  13. The Hanford Site 1000-Year Cap Design Test

    SciTech Connect (OSTI)

    Gee, Glendon W. ); Ward, Anderson L. ); Wittreich, Curtis D.

    2002-12-27

    Surface barrier or capping technology is needed to isolate buried wastes. A successful cap must prevent the intrusion of plants, animals, and man into the underlying waste, minimize wind and water erosion, require minimal maintenance, and limit water intrusion to near-zero amounts. For some sites where wastes are long-lived, caps should potentially last a thousand years or more. At the U.S. Department of Energy (DOE) Hanford Site in Washington State, a surface cap with a 1000-year design life was constructed and then tested and monitored for performance under wetting conditions that are extreme for the region. The cap was built in 1994 over an existing waste site as a part of a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) treatability test. The above-grade barrier or cap consists of a 2-m-thick silt-loam soil overlying layers (from top down) of sand, gravel, basalt rock (riprap), and a low-permeability asphalt. Two sideslope configurations, a clean-fill gravel on a 10:1 slope and a basalt riprap on a 2:1 slope were part of the overall design and testing. Design considerations included constructability; water-balance monitoring; wind and water erosion control and monitoring; surface revegetation, biointrusion control, subsidence, and sideslope stability; and durability of the asphalt layer.

  14. Yearly Energy Costs for Buildings

    Energy Science and Technology Software Center (OSTI)

    1991-03-20

    COSTSAFR3.0 generates a set of compliance forms which will be attached to housing Requests for Proposals (RFPs) issued by Departments or Agencies of the Federal Government. The compliance forms provide a uniform method for estimating the total yearly energy cost for each proposal. COSTSAFR3.0 analyzes specific housing projects at a given site, using alternative fuel types, and considering alternative housing types. The program is designed around the concept of minimizing overall costs through energy conservationmore » design, including first cost and future utility costs, and estabilishes a standard design to which proposed housing designs are compared. It provides a point table for each housing type that can be used to determine whether a proposed design meets the standard and how a design can be modified to meet the standard.« less

  15. Fiscal Year 2014 Revegetation Assessment

    SciTech Connect (OSTI)

    Nordstrom, Jenifer

    2015-03-01

    This report summarizes the Fiscal Year 2014 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to document revegetation efforts at Idaho National Laboratory to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Five disturbed sites were evaluated for this assessment. Four sites are recommended to be removed from the annual assessment, and one is recommended for continued evaluation. New sites are also identified for future monitoring as part of the annual assessment.

  16. Balanced Scorecard

    Broader source: Energy.gov (indexed) [DOE]

    Satisfaction - Employee Alignment FINANCIAL - Optimum Cost Efficiency of Purchasing Operations - Financial Contributions of Procurement via Cost Savings MISSION VISION STRATEGY...

  17. Balanced Scorecard

    Broader source: Energy.gov (indexed) [DOE]

    INTERNAL BUSINESS PROCESSES - Effective Internal Controls - Effective Supplier Management - Use of Effective Competition - Effective Utilization of Alternate Procurement...

  18. CAB-Comm Final Report Documents Accomplishments from Six Years...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    development of genetic tools, crop protection, and nutrient utilization and recycling. ... mass balance model to assess best-practices and technologies for nutrient recycling. ...

  19. Fiscal year 1987 program plan

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

  20. NREL: Technology Deployment - Greensburg, Kansas, Five Years...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Greensburg, Kansas, Five Years Later-An International Inspiration for Green Disaster ... Now, five years later-Greensburg has become an international inspiration for green ...

  1. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Weyl Fermions Discovered After 85 Years Print Wednesday, 09 December 2015 00:00 An international team led by Princeton University scientists ...

  2. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: ...

  3. NERSC: 40 YEARS AT THE FOREFRONT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CALENDAR CSO 0019 NERSC: 40 YEARS AT THE FOREFRONT In 1974, an almost-obsolete ... Scientific Computing Center. Through the years, NERSC's mission has remained consistent: ...

  4. NERSC Celebrates 40 Years at the Forefront

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC Celebrates 40 Years of Supercomputing NERSC Celebrates 40 Years at the Forefront DOE supercomputing facility has been supporting broad-based scientific research since 1974 ...

  5. The Geothermal Technologies Office Congratulates this Year's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Geothermal Technologies Office Congratulates this Year's GEA Honors Awardees The Geothermal Technologies Office Congratulates this Year's GEA Honors Awardees December 11, 2013...

  6. Environmental Monitoring and Remediation Committee Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Monitoring and Remediation Committee Fiscal Year 2015 Work Plan Topics: ... More Documents & Publications Waste Management Committee Fiscal Year 2015 Work Plan ...

  7. Environmental Monitoring and Remediation Committee Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Monitoring and Remediation Committee Fiscal Year 2016 Work Plan Topics: ... Environmental Monitoring and Remediation Committee Fiscal Year 2015 Work Plan Waste ...

  8. The influence of air temperature inversions on snowmelt and glacier mass-balance simulations, Ammassalik island, SE Greenland

    SciTech Connect (OSTI)

    Mernild, Sebastian Haugard [Los Alamos National Laboratory; Liston, Glen [COLORADO STATE UNIV.

    2009-01-01

    In many applications, a realistic description of air temperature inversions is essential for accurate snow and glacier ice melt, and glacier mass-balance simulations. A physically based snow-evolution modeling system (SnowModel) was used to simulate eight years (1998/99 to 2005/06) of snow accumulation and snow and glacier ice ablation from numerous small coastal marginal glaciers on the SW-part of Ammassalik Island in SE Greenland. These glaciers are regularly influenced by inversions and sea breezes associated with the adjacent relatively low temperature and frequently ice-choked fjords and ocean. To account for the influence of these inversions on the spatiotemporal variation of air temperature and snow and glacier melt rates, temperature inversion routines were added to MircoMet, the meteorological distribution sub-model used in SnowModel. The inversions were observed and modeled to occur during 84% of the simulation period. Modeled inversions were defined not to occur during days with strong winds and high precipitation rates due to the potential of inversion break-up. Field observations showed inversions to extend from sea level to approximately 300 m a.s.l., and this inversion level was prescribed in the model simulations. Simulations with and without the inversion routines were compared. The inversion model produced air temperature distributions with warmer lower elevation areas and cooler higher elevation areas than without inversion routines due to the use of cold sea-breeze base temperature data from underneath the inversion. This yielded an up to 2 weeks earlier snowmelt in the lower areas and up to 1 to 3 weeks later snowmelt in the higher elevation areas of the simulation domain. Averaged mean annual modeled surface mass-balance for all glaciers (mainly located above the inversion layer) was -720 {+-} 620 mm w.eq. y{sup -1} for inversion simulations, and -880 {+-} 620 mm w.eq. y{sup -1} without the inversion routines, a difference of 160 mm w.eq. y{sup -1}. The annual glacier loss for the two simulations was 50.7 x 10{sup 6} m{sup 3} y{sup -1} and 64.4 x 10{sup 6} m{sup 3} y{sup -1} for all glaciers - a difference of {approx}21%. The average equilibrium line altitude (ELA) for all glaciers in the simulation domain was located at 875 m a.s.l. and at 900 m a.s.l. for simulations with or without inversion routines, respectively.

  9. Superconducting quantum interference device microsusceptometer balanced over a wide bandwidth for nuclear magnetic resonance applications

    SciTech Connect (OSTI)

    Vinante, A. Falferi, P.; Mezzena, R.

    2014-10-15

    Superconducting Quantum Interference Device (SQUID) microsusceptometers have been widely used to study magnetic properties of materials at microscale. As intrinsically balanced devices, they could also be exploited for direct SQUID-detection of nuclear magnetic resonance (NMR) from micron sized samples, or for SQUID readout of mechanically detected NMR from submicron sized samples. Here, we demonstrate a double balancing technique that enables achievement of very low residual imbalance of a SQUID microsusceptometer over a wide bandwidth. In particular, we can generate ac magnetic fields within the SQUID loop as large as 1 mT, for frequencies ranging from dc up to a few MHz. As an application, we demonstrate direct detection of NMR from {sup 1}H spins in a glycerol droplet placed directly on top of the 20 ?m SQUID loops.

  10. Measure Guideline. Steam System Balancing and Tuning for Multifamily Residential Buildings

    SciTech Connect (OSTI)

    Choi, Jayne; Ludwig, Peter; Brand, Larry

    2013-04-01

    This guideline provides building owners, professionals involved in multifamily audits, and contractors insights for improving the balance and tuning of steam systems. It provides readers an overview of one-pipe steam heating systems, guidelines for evaluating steam systems, typical costs and savings, and guidelines for ensuring quality installations. It also directs readers to additional resources for details not included here. Measures for balancing a distribution system that are covered include replacing main line vents and upgrading radiator vents. Also included is a discussion on upgrading boiler controls and the importance of tuning the settings on new or existing boiler controls. The guideline focuses on one-pipe steam systems, though many of the assessment methods can be generalized to two-pipe steam systems.

  11. Low-Level waste phase 1 melter testing off gas and mass balance evaluation

    SciTech Connect (OSTI)

    Wilson, C.N.

    1996-06-28

    Commercially available melter technologies were tested during 1994-95 as part of a multiphase program to test candidate technologies for vitrification of the low-level waste (LLW) stream to be derived from retrieval and pretreatment of Hanford Site tank wastes. Seven vendors were selected for Phase 1 testing to demonstrate vitrification of a high sodium content liquid LLW simulant. The tested melter technologies included four Joule-heated melters, a carbon electrode melter, a combustion melter, and a plasma melter. Various dry and slurry melter feed preparation processes were also tested. Various feed material samples, product glass samples, and process offgas streams were characterized to provide data for evaluation of process decontamination factors and material mass balances for each vitrification technology. This report describes the melter mass balance evaluations and results for six of the Phase 1 LLW melter vendor demonstration tests.

  12. Power balance in a high-density field reversed configuration plasma

    SciTech Connect (OSTI)

    Renneke, R. M.; Intrator, T. P.; Hsu, S. C.; Wurden, G. A.; Waganaar, W. J.; Ruden, E. L.; Grabowski, T. C.

    2008-06-15

    A global power balance analysis has been performed for the Field Reversed Experiment with Liner high density (>5x10{sup 22} m{sup -3}) field reversed configuration (FRC) plasma. The analysis was based on a zero-dimensional power balance model [D. J. Rey and M. Tuszewski, Phys. Fluids 27, 1514 (1984)]. The key findings are as follows. First, the percentage of radiative losses relative to total loss is an order of magnitude lower than previous lower density FRC experiments. Second, Ohmic heating was found to correlate with the poloidal flux trapping at FRC formation, suggesting that poloidal flux dissipation is primarily responsible for plasma heating. Third, high density FRCs analyzed in this work reinforce the low-density adiabatic scaling, which shows that particle confinement time and flux confinement time are approximately equal.

  13. Modular Approach for Continuous Cell-Level Balancing to Improve Performance of Large Battery Packs: Preprint

    SciTech Connect (OSTI)

    Muneed ur Rehman, M.; Evzelman, M.; Hathaway, K.; Zane, R.; Plett, G. L.; Smith, K.; Wood, E.; Maksimovic, D.

    2014-10-01

    Energy storage systems require battery cell balancing circuits to avoid divergence of cell state of charge (SOC). A modular approach based on distributed continuous cell-level control is presented that extends the balancing function to higher level pack performance objectives such as improving power capability and increasing pack lifetime. This is achieved by adding DC-DC converters in parallel with cells and using state estimation and control to autonomously bias individual cell SOC and SOC range, forcing healthier cells to be cycled deeper than weaker cells. The result is a pack with improved degradation characteristics and extended lifetime. The modular architecture and control concepts are developed and hardware results are demonstrated for a 91.2-Wh battery pack consisting of four series Li-ion battery cells and four dual active bridge (DAB) bypass DC-DC converters.

  14. Steam System Balancing and Tuning for Multifamily Residential Buildings in Chicagoland

    SciTech Connect (OSTI)

    Choi, Jayne; Ludwig, Peter; Brand, Larry

    2012-08-01

    Older heating systems often suffer from mis-investment--multiple contractors upgrading parts of systems in inadequate or inappropriate ways that reduce system functionality and efficiency--or from a lack of proper maintenance. This technical report addresses these barriers to information, contractor resources, and cost-savings. Building off of previous research, CNT Energy conducted a study to identify best practices for the methodology, typical costs, and energy savings associated with steam system balancing.

  15. Material Balance Assessment for Double-Shell Tank Waste Pipeline Transfer

    SciTech Connect (OSTI)

    Onishi, Yasuo; Wells, Beric E.; Hartley, Stacey A.; Enderlin, Carl W.; White, Mike

    2002-10-30

    PNNL developed a material balance assessment methodology based on conservation of mass for detecting leaks and mis-routings in pipeline transfer of double-shell tank waste at Hanford. The main factors causing uncertainty in these transfers are variable property and tank conditions of density, existence of crust, and surface disturbance due to mixer pump operation during the waste transfer. The methodology was applied to three waste transfers from Tanks AN-105 and AZ-102.

  16. Systems Engineering of Chemical Hydrogen Storage, Pressure Vessel and Balance of Plant for Onboard Hydrogen Storage

    SciTech Connect (OSTI)

    Brooks, Kriston P.; Simmons, Kevin L.; Weimar, Mark R.

    2014-09-02

    This is the annual report for the Hydrogen Storage Engineering Center of Excellence project as required by DOE EERE's Fuel Cell Technologies Office. We have been provided with a specific format. It describes the work that was done with cryo-sorbent based and chemical-based hydrogen storage materials. Balance of plant components were developed, proof-of-concept testing performed, system costs estimated, and transient models validated as part of this work.

  17. NREL to Partner with RES Americas on Wind Balance-of-Plant Research - News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Releases | NREL to Partner with RES Americas on Wind Balance-of-Plant Research June 17, 2009 The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) and Renewable Energy Systems Americas, Inc. (RES Americas) have announced a partnership to evaluate the design and performance of vital wind energy support systems. Under a Cooperative Research and Development Agreement (CRADA), NREL and RES Americas will investigate structural loads on foundations of operating wind

  18. Analysis Methodology for Balancing Authority Cooperation in High Penetration of Variable Generation

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Etingov, Pavel V.; Zhou, Ning; Ma, Jian; Samaan, Nader A.; Diao, Ruisheng; Malhara, Sunita V.; Guttromson, Ross T.; Du, Pengwei; Sastry, Chellury

    2010-02-01

    With the rapidly growing penetration level of wind and solar generation, the challenges of managing variability and the uncertainty of intermittent renewable generation become more and more significant. The problem of power variability and uncertainty gets exacerbated when each balancing authority (BA) works locally and separately to balance its own subsystem. The virtual BA concept means various forms of collaboration between individual BAs must manage power variability and uncertainty. The virtual BA will have a wide area control capability in managing its operational balancing requirements in different time frames. This coordination results in the improvement of efficiency and reliability of power system operation while facilitating the high level integration of green, intermittent energy resources. Several strategies for virtual BA implementation, such as ACE diversity interchange (ADI), wind only BA, BA consolidation, dynamic scheduling, regulation and load following sharing, extreme event impact study are discussed in this report. The objective of such strategies is to allow individual BAs within a large power grid to help each other deal with power variability. Innovative methods have been developed to simulate the balancing operation of BAs. These methods evaluate the BA operation through a number of metrics such as capacity, ramp rate, ramp duration, energy and cycling requirements to evaluate the performances of different virtual BA strategies. The report builds a systematic framework for evaluating BA consolidation and coordination. Results for case studies show that significant economic and reliability benefits can be gained. The merits and limitation of each virtual BA strategy are investigated. The report provides guidelines for the power industry to evaluate the coordination or consolidation method. The application of the developed strategies in cooperation with several regional BAs is in progress for several off-spring projects.

  19. Explicit spatial scattering for load balancing in conservatively synchronized parallel discrete-event simulations

    SciTech Connect (OSTI)

    Thulasidasan, Sunil; Kasiviswanathan, Shiva; Eidenbenz, Stephan; Romero, Philip

    2010-01-01

    We re-examine the problem of load balancing in conservatively synchronized parallel, discrete-event simulations executed on high-performance computing clusters, focusing on simulations where computational and messaging load tend to be spatially clustered. Such domains are frequently characterized by the presence of geographic 'hot-spots' - regions that generate significantly more simulation events than others. Examples of such domains include simulation of urban regions, transportation networks and networks where interaction between entities is often constrained by physical proximity. Noting that in conservatively synchronized parallel simulations, the speed of execution of the simulation is determined by the slowest (i.e most heavily loaded) simulation process, we study different partitioning strategies in achieving equitable processor-load distribution in domains with spatially clustered load. In particular, we study the effectiveness of partitioning via spatial scattering to achieve optimal load balance. In this partitioning technique, nearby entities are explicitly assigned to different processors, thereby scattering the load across the cluster. This is motivated by two observations, namely, (i) since load is spatially clustered, spatial scattering should, intuitively, spread the load across the compute cluster, and (ii) in parallel simulations, equitable distribution of CPU load is a greater determinant of execution speed than message passing overhead. Through large-scale simulation experiments - both of abstracted and real simulation models - we observe that scatter partitioning, even with its greatly increased messaging overhead, significantly outperforms more conventional spatial partitioning techniques that seek to reduce messaging overhead. Further, even if hot-spots change over the course of the simulation, if the underlying feature of spatial clustering is retained, load continues to be balanced with spatial scattering leading us to the observation that spatial scattering can often obviate the need for dynamic load balancing.

  20. Renewable Portfolio Standards in the States: Balancing Goals and Implementation Strategies

    SciTech Connect (OSTI)

    Cory, K. S.; Swezey, B. G.

    2007-12-01

    This paper reports on renewable portfolio standards (RPS) and how the RPS rules vary from state to state. This variation presents important challenges to successful implementation. Key issues are discussed in terms of resource availability, solar-specific provisions, and political and regulatory consistency, and their impacts on the ability to finance new renewable energy projects. This report emphasizes the fact that a successful RPS policy must balance a state's goals for fuel diversity, economic development, price effects, and environmental benefits.

  1. Upgrades to SNL-EFDC: A Tool to Balance Marine Hydrokinetic Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generation Efficiency with Environmental Response Upgrades to SNL-EFDC: A Tool to Balance Marine Hydrokinetic Energy Generation Efficiency with Environmental Response - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy

  2. Balance of Plant (BoP) Components Validation for Fuel Cells | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy (BoP) Components Validation for Fuel Cells Balance of Plant (BoP) Components Validation for Fuel Cells Slides from the U.S. Department of Energy Hydrogen Component and System Qualification Workshop held November 4, 2010 in Livermore, CA. PDF icon csqw_lakshmanan.pdf More Documents & Publications Effect of System and Air Contaminants on PEMFC Performance and Durability Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive Applications: Fuel Cell Tech Team Review An

  3. Interfacial stress balances in structured continua and free surface flows in ferrofluids

    SciTech Connect (OSTI)

    Chaves, Arlex; Rinaldi, Carlos

    2014-04-15

    Interfacial linear and internal angular momentum balances are obtained for a structured continuum and for the special case of a ferrofluid, a suspension of magnetic nanoparticles in a Newtonian fluid. The interfacial balance equations account for the effects of surface tension and surface tension gradient, magnetic surface excess forces, antisymmetric stresses, and couple stresses in driving interfacial flows in ferrofluids. Application of the interfacial balance equations is illustrated by obtaining analytical expressions for the translational and spin velocity profiles in a thin film of ferrofluid on an infinite flat plate when a rotating magnetic field is applied with axis of rotation parallel to the ferrofluid/air interface. The cases of zero and non-zero spin viscosity are considered for small applied magnetic field amplitude. Expressions for the maximum translational velocity, slope of the translational velocity profile at the ferrofluid/air interface, and volumetric flow rate are obtained and their use to test the relevance of spin viscosity and couple stresses in the flow situation under consideration is discussed.

  4. Analysis of Unit-Level Changes in Operations with Increased SPP Wind from EPRI/LCG Balancing Study

    SciTech Connect (OSTI)

    Hadley, Stanton W

    2012-01-01

    Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The Department of Energy funded the project 'Integrating Midwest Wind Energy into Southeast Electricity Markets' to be led by EPRI in coordination with the main authorities for the regions: SPP, Entergy, TVA, Southern Company and OPC. EPRI utilized several subcontractors for the project including LCG, the developers of the model UPLAN. The study aims to evaluate the operating cost benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of regional cooperation for integrating mid-western wind energy into southeast electricity markets. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. DOE funded Oak Ridge National Laboratory to provide additional support to the project, including a review of results and any side analysis that may provide additional insight. This report is a unit-by-unit analysis of changes in operations due to the different scenarios used in the overall study. It focuses on the change in capacity factors and the number of start-ups required for each unit since those criteria summarize key aspects of plant operations, how often are they called upon and how much do they operate. The primary analysis of the overall project is based on security-constrained unit commitment (SCUC) and economic dispatch (SCED) simulations of the SPP-SERC regions as modeled for the year 2022. The SCUC/SCED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as best as possible in the model. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy.

  5. Three Year Rolling Timeline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Three Year Rolling Timeline Three Year Rolling Timeline PDF icon The Department&#8217;s real property assets are vital to the accomplishment of its mission More Documents & Publications FY2012 Three Year Rolling Timeline Three-year Rolling Timeline The Department&#8217;s real property assets are vital to the accomplishment of its mission

  6. The coming year - 2012 | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The coming year - 2012 The coming year - 2012 January 17, 2011 It has not been our habit to use these articles to record the mundane passage of time, the annual holidays, the turn of the fiscal year or, in general, the turn of the calendar year. On the other hand, we are about to start a calendar year with a budget for the rest of the fiscal year already decided, at least at the higher levels. Just before the end of the year, Congress passed, and the President signed, the legislation determining

  7. Federal Geothermal Research Program Update Fiscal Year 2002

    SciTech Connect (OSTI)

    Not Available

    2003-09-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The goals are: (1) Double the number of States with geothermal electric power facilities to eight by 2006; (2) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2002. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.

  8. Federal Geothermal Research Program Update Fiscal Year 2003

    SciTech Connect (OSTI)

    Not Available

    2004-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office. The goals are: (1) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; (2) Double the number of States with geothermal electric power facilities to eight by 2006; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2003. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.

  9. Site environmental report for calendar year 1996

    SciTech Connect (OSTI)

    1997-08-01

    The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts to the US Department of Energy (DOE) Strategic Petroleum Reserve (SPR). The SER, provided annually in accordance with DOE Order 5400.1, serves the public by summarizing monitoring data collected to assess how the SPR impacts the environment. The SER provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits.

  10. A Water Balance Study of Four Landfill Cover Designs at Material Disposal Area B in Los Alamos, New Mexico

    SciTech Connect (OSTI)

    David D. Breshears; Fairley J. Barnes; John W. Nyhan; Johnny A. Salazar

    1998-09-01

    The goal of disposing of low-level radioactive and hazardous waste in shallow landfills is to reduce risk to human health and the environment by isolating contaminants until they no longer pose an unacceptable hazard. In order to achieve this, the Department of Energy Environmental Restoration Program is comparing the performance of several different surface covers at Material Disposal Area (MDA) B in Los Alamos. Two conventional landfill were compared with an improved cover designed to minimize plant and animal intrusion and to minimize water infiltration into the underlying wastes. The conventional covers varied in depth and both conventional and improved designs had different combinations of vegetation (grass verses shrub) and gravel mulch (no mulch verses mulch). These treatments were applied to each of 12 plots and water balance parameters were measured from March1987 through June 1995. Adding a gravel mulch significantly influenced the plant covered field plots receiving no gravel mulch averaged 21.2% shrub cover, while plots with gravel had a 20% larger percent cover of shrubs. However, the influence of gravel mulch on the grass cover was even larger than the influence on shrub cover, average grass cover on the plots with no gravel was 16.3%, compared with a 42% increase in grass cover due to gravel mulch. These cover relationships are important to reduce runoff on the landfill cover, as shown by a regression model that predicts that as ground cover is increased from 30 to 90%,annual runoff is reduced from 8.8 to 0.98 cm-a nine-fold increase. We also found that decreasing the slope of the landfill cover from 6 to 2% reduced runoff from the landfill cover by 2.7-fold. To minimize the risk of hazardous waste from landfills to humans, runoff and seepage need to be minimized and evapotranspiration maximized on the landfill cover. This has to be accomplished for dry and wet years at MDA B. Seepage consisted of 1.9% and 6.2% of the precipitation in the average and once in ten year events, respectively, whereas corresponding values for runoff were 13% and 16%; these changes were accompanied by corresponding decreases in evapotranspiration, which accounted for 86% and only 78% of the precipitation occurring on the average and once in ten year even~ respectively.

  11. 200-BP-1 Prototype Hanford Barrier -- 15 Years of Performance Monitoring

    SciTech Connect (OSTI)

    Ward, Anderson L.; Draper, Kathryn E.; Link, Steven O.; Clayton, Ray E.

    2011-09-30

    Monitoring is an essential component of engineered barrier system design and operation. A composite capacitive cover, including a capillary break and an evapotranspiration (ET) barrier at the Hanford Site, is generating data that can be used to help resolve these issues. The prototype Hanford barrier was constructed over the 216-B-57 Crib in 1994 to evaluate surface-barrier constructability, construction costs, and physical and hydrologic performance at the field scale. The barrier has been routinely monitored between November 1994 and September 1998 as part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200 BP 1 Operable Unit. Since FY 1998, monitoring has focused on a more limited set of key water balance, stability, and biotic parameters. In FY 2009, data collection was focused on: (1) water-balance monitoring, consisting of precipitation, runoff, soil moisture storage, and drainage measurements with evapotranspiration calculated by difference; (2) stability monitoring, consisting of asphalt-layer-settlement, basalt-side-slope-stability, and surface-elevation measurements; (3) vegetation dynamics; and (4) animal use. September 2009 marked 15 years since the start of monitoring and the collection of performance data. This report describes the results of monitoring activities during the period October 1, 2008, through September 30, 2009, and summarizes the 15 years of performance data collected from September 1994 through September 2009.

  12. ALS History: The First 20 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History: The First 20 Years Print Below is an interactive timeline covering highlights of the first 20 years of ALS history. By no means exhaustive, it is meant to provide a broad ...

  13. After 5 Years, NERSC's Franklin Retires

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    After 5 Years, NERSC's Franklin Retires After 5 Years, NERSC's Franklin Retires May 4, 2012 Linda Vu, lvu@lbl.gov, +1 510 495 2402 Franklin Cray XT4 supercomputer: Franklin Cray ...

  14. Top 10 science stories of the year

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Top 10 science stories of the year Top 10 science stories of the year From supercomputers and climate modeling, to cybersecurity and cancer treatments, Los Alamos worked hard in ...

  15. CERCLA Five-Year Review - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RIFS Sitewide Probabilistic Seismic Hazard Analysis Environmental CERCLA Five-Year Review Third CERCLA Five-Year Review...

  16. Program Year 2008 State Energy Program Formula

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) State Energy Program (SEP), SEP Program Guidance Fiscal Year 2008, Program Year 2008, energy efficiency and renewable energy programs in the states, DOE Office of Energy Efficiency and Renewable Energy

  17. NV Energy Solar Integration Study: Cycling and Movements of Conventional Generators for Balancing Services

    SciTech Connect (OSTI)

    Diao, Ruisheng; Lu, Shuai; Etingov, Pavel V.; Ma, Jian; Makarov, Yuri V.; Guo, Xinxin

    2011-07-01

    With an increasing penetration level of solar power in the southern Nevada system, the impact of solar on system operations needs to be carefully studied from various perspectives. Qualitatively, it is expected that the balancing requirements to compensate for solar power variability will be larger in magnitude; meanwhile, generators providing load following and regulation services will be moved up or down more frequently. One of the most important tasks is to quantitatively evaluate the cycling and movements of conventional generators with solar power at different penetration levels. This study is focused on developing effective methodologies for this goal and providing a basis for evaluating the wear and tear of the conventional generators

  18. Relativistic theory of nuclear spin-rotation tensor with kinetically balanced rotational London orbitals

    SciTech Connect (OSTI)

    Xiao, Yunlong; Zhang, Yong; Liu, Wenjian

    2014-10-28

    Both kinetically balanced (KB) and kinetically unbalanced (KU) rotational London orbitals (RLO) are proposed to resolve the slow basis set convergence in relativistic calculations of nuclear spin-rotation (NSR) coupling tensors of molecules containing heavy elements [Y. Xiao and W. Liu, J. Chem. Phys. 138, 134104 (2013)]. While they perform rather similarly, the KB-RLO Ansatz is clearly preferred as it ensures the correct nonrelativistic limit even with a finite basis. Moreover, it gives rise to the same direct relativistic mapping between nuclear magnetic resonance shielding and NSR coupling tensors as that without using the London orbitals [Y. Xiao, Y. Zhang, and W. Liu, J. Chem. Theory Comput. 10, 600 (2014)].

  19. ,"U.S. Natural Gas Annual Supply and Disposition Balance"

    U.S. Energy Information Administration (EIA) Indexed Site

    Annual Supply and Disposition Balance" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Supply",5,"Annual",2015,"6/30/1930" ,"Data 2","Disposition",5,"Annual",2015,"6/30/1930" ,"Release Date:","4/29/2016" ,"Next Release

  20. Tank 12H Acidic Chemical Cleaning Sample Analysis And Material Balance

    SciTech Connect (OSTI)

    Martino, C. J.; Reboul, S. H.; Wiersma, B. J.; Coleman, C. J.

    2013-11-08

    A process of Bulk Oxalic Acid (BOA) chemical cleaning was performed for Tank 12H during June and July of 2013 to remove all or a portion of the approximately 4400 gallon sludge heel. Three strikes of oxalic acid (nominally 4 wt % or 2 wt %) were used at 55 ?C and tank volumes of 96- to 140-thousand gallons. This report details the sample analysis of a scrape sample taken prior to BOA cleaning and dip samples taken during BOA cleaning. It also documents a rudimentary material balance for the Tank 12H cleaning results.

  1. Environmental Monitoring and Remediation Committee Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Monitoring and Remediation Committee Fiscal Year 2014 Work Plan Topics: ... More Documents & Publications Environmental Monitoring and Remediation Committee Fiscal ...

  2. Environmental Monitoring and Remediation Committee Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Monitoring and Remediation Committee Fiscal Year 2013 Work Plan Topics: ... More Documents & Publications Environmental Monitoring and Remediation Committee Fiscal ...

  3. Secretary Chu Celebrates NNSA's 10-Year Anniversary

    ScienceCinema (OSTI)

    Department of Energy Secretary Steven Chu

    2010-09-01

    Department of Energy Secretary Steven Chu speaks at NNSA's 10-year anniversary celebration on April 28, 2010.

  4. Google Archives by Fiscal Year — Solar

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Solar Energy Technologies Office, retired Google Analytics profiles for the sites by fiscal year.

  5. Webtrends Archives by Fiscal Year — Solar

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Solar Energy Technologies Office / Sunshot sites, Webtrends archives by fiscal year.

  6. Webtrends Archives by Fiscal Year — Education

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Education site by fiscal year.

  7. Google Archives by Fiscal Year — FEMP

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Federal Energy Management Program, retired Google Analytics profiles for the sites by fiscal year.

  8. Google Archives by Fiscal Year — Buildings

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Building Technologies Office, retired Google Analytics profiles for the sites by fiscal year.

  9. Fiscal Year 2009 budget-in-brief

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Fiscal Year 2009 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy.

  10. Fiscal Year 2007 budget-in-brief

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Fiscal Year 2007 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy.

  11. Fiscal Year 2008 budget-in-brief

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Fiscal Year 2008 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy.

  12. Google Archives by Fiscal Year — Greensburg

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profile for the Greensburg site for fiscal year 2012.

  13. Cray and NERSC Through the Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jeff Brooks Cray and NERSC Through the Years February 5, 2014 Jeff Brooks, Cray Downloads NERSCandCray40YearBrooks.pdf | Adobe Acrobat PDF file Cray and NERSC Through the Years Last edited: 2014-02-14 16:33:27

  14. Museum Closed for New Year's Holiday

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Museum Closed for New Year's Holiday Museum Closed for New Year's Holiday WHEN: Jan 01, 2016 12:00 AM - 11:59 PM WHERE: Bradbury Science Museum 1350 Central Ave, Los Alamos, NM 87544, USA CATEGORY: Bradbury INTERNAL: Calendar Login Museum Closed for New Year's Holiday Event Description The Bradbury Science Museum will be CLOSED for the New Year's holiday. The Bradbury Science Museum is open to the public every day except for Thanksgiving Day, Christmas Day and New Year's Day. Admission is always

  15. Mass balance and separation factor of actinides through series process test on pyro-process

    SciTech Connect (OSTI)

    Kitawaki, Shinichi; Fukushima, Mineo; Yahagi, Noboru; Kurata, Masaki

    2007-07-01

    An electrolysis test in a sequential condition was performed using U-Pu alloy and liquid Cd as an anode and a cathode material, respectively, in which the anode and cathode was changed three times. Mass balance of U and Pu after three-time electrolysis was determined from both the chemical analysis of salt and anode residue, and the weight increase in the cathode. Approximately 95% of U and 100% of Pu was detected even after three times electrolysis. The loss of U is more significant than that of Pu. The mass balance was also evaluated for the intermediate steps of the sequence. More than 90% of U and Pu with respect to the initial amount were constantly caught up with in each step. The separation factor of U/Pu in three cathodes were varied 1.62-2.06. The chemical form of the anode residue was UO, PuOCl and PuO{sub 2}, which can be converted to the chloride by a reaction with ZrCl{sub 4}. (authors)

  16. Balancing Conflicting Requirements for Grid and Particle Decomposition in Continuum-Lagrangian Solvers

    SciTech Connect (OSTI)

    Sitaraman, Hariswaran; Grout, Ray

    2015-10-30

    The load balancing strategies for hybrid solvers that involve grid based partial differential equation solution coupled with particle tracking are presented in this paper. A typical Message Passing Interface (MPI) based parallelization of grid based solves are done using a spatial domain decomposition while particle tracking is primarily done using either of the two techniques. One of the techniques is to distribute the particles to MPI ranks to whose grid they belong to while the other is to share the particles equally among all ranks, irrespective of their spatial location. The former technique provides spatial locality for field interpolation but cannot assure load balance in terms of number of particles, which is achieved by the latter. The two techniques are compared for a case of particle tracking in a homogeneous isotropic turbulence box as well as a turbulent jet case. We performed a strong scaling study for more than 32,000 cores, which results in particle densities representative of anticipated exascale machines. The use of alternative implementations of MPI collectives and efficient load equalization strategies are studied to reduce data communication overheads.

  17. Agency Improvement Plan For Fiscal Year 2006 and Fiscal Year 2007 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Agency Improvement Plan For Fiscal Year 2006 and Fiscal Year 2007 Agency Improvement Plan For Fiscal Year 2006 and Fiscal Year 2007 Department of Energy Report and Agency Improvement Plan,For Fiscal Year 2006 and Fiscal Year 2007 PDF icon Agency Improvement Plan For Fiscal Year 2006 and Fiscal Year 2007 More Documents & Publications Office of Information Resources (MA-90) Microsoft Word - DOE E-Government Act Report 11.16.06 Final.doc FY 2008 E-Government Act Repo

  18. NERSC Celebrates 40 Years at the Forefront

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC Celebrates 40 Years of Supercomputing NERSC Celebrates 40 Years at the Forefront DOE supercomputing facility has been supporting broad-based scientific research since 1974 January 29, 2014 Contact: Kathy Kincade, KKincade@lbl.gov, +1 510 495 2124 horstsimon2013 Horst Simon This year, the Department of Energy's (DOE) National Energy Research Scientific Computing Center (NERSC) is celebrating yet another milestone: its 40th anniversary. Since its founding in 1974, NERSC has become the

  19. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Weyl Fermions Discovered After 85 Years Print Wednesday, 09 December 2015 00:00 An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure

  20. Lab celebrates 50 years in space

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    celebrates 50 years in space Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:May 2016 all issues All Issues » submit Lab celebrates 50 years in space National security missions and pure research December 1, 2013 Lab celebrates 50 years in space Lab's instruments have helped detect possible nuclear weapon detonations and led to fundamental scientific discoveries. Contacts Community Programs Office Director Kurt Steinhaus Email Editor

  1. Sandia's Cooperative Monitoring Center celebrates 20 years |...

    National Nuclear Security Administration (NNSA)

    Cooperative Monitoring Center celebrates 20 years Tuesday, November 18, 2014 - 4:10pm Sandia National Laboratories' Cooperative Monitoring Center is celebrating its 20th ...

  2. Richland Operations Office's Fiscal Year 2013...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2012 through September 2013 (fiscal year 2013) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 14,092,235 (includes fee set...

  3. Calendar Year 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy's Fiscal Year 2013 Consolidated Financial Statements December 6, 2013 Special Report: IG-0900 Department of Energy's July 2013 Cyber Security Breach November ...

  4. Fiscal Year 2010 Budget-in-Brief

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency and Renewable Energy Fiscal Year 2010 Budget-in-Brief www.eere.energy.gov Table of Contents Table of Contents...................................................................................................................................... 2 Preface ...................................................................................................................................................... 3 Highlights:

  5. Google Archives by Fiscal Year — ERAC

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profile for the Efficiency and Renewables Advisory Committee site for fiscal year 2012-13.

  6. FTCP Annual Report- Calendar Year 2007

    Broader source: Energy.gov [DOE]

    Report summarizes the yearly actions taken to ensure organizations maintain their critical technical capabilities needed for the safe operations of defense nuclear facilities.

  7. Secretary Moniz's First Year | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    First Year Secretary Moniz's First Year May 21, 2014 - 9:21am Addthis Marissa Newhall Marissa Newhall Director of Digital Strategy and Communications It's been one year since Dr. Ernest J. Moniz was sworn in as the 13th U.S. Secretary of Energy. Since then, he's been busy. We're marking the occasion with a look back at some big moments from Secretary Moniz's first year in office -- including landmark energy policy speeches, visits to some of the Energy Department's National Labs, the launch of

  8. Allocation Year Rollover: 2015 to 2016

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Allocation Year Rollover Allocation Year Rollover: 2015 to 2016 Note: Allocation Year 2015 (AY15) ends at 23:59:59 on Monday, January 11, 2016. AY16 runs from Tuesday, January 12, 2016 through Monday, January 09, 2017. Below are major changes that will go into effect with the beginning of AY16 on Tuesday, January 12, 2016. All times listed are PST. Scheduled Systems and Services Downtimes There will be no computational systems disruptions during the allocation year rollover and jobs will run

  9. Webtrends Archives by Fiscal Year - Business Administration ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business Administration Webtrends Archives by Fiscal Year - Business Administration From the EERE Web Statistics Archive: Office of Business Administration (later renamed to ...

  10. Webtrends Archives by Fiscal Year - Commercialization | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercialization Webtrends Archives by Fiscal Year - Commercialization From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Commercialization site by ...

  11. Webtrends Archives by Fiscal Year — WIP

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: WIP, Webtrends archives for the site, including EECBG, Solution Center, and Weatherization Assistance Program, by fiscal year.

  12. EMSL Fiscal Year 2008 Annual Report

    SciTech Connect (OSTI)

    Showalter, Mary Ann

    2009-01-23

    This annual report provides details on the research conducted at EMSL--the Environmental Molecular Sciences Laboratory in Fiscal Year 2008.

  13. Calendar Year 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 30, 2013, Under Department of Energy Contract No. ... Department of Energy's Nuclear Waste Fund's Fiscal Year 2014 ... Allegation Regarding Human Reliability Program Unsuitable ...

  14. FTCP Annual Report- Fiscal Year 2004

    Broader source: Energy.gov [DOE]

    Report summarizes the yearly actions taken to ensure organizations maintain their critical technical capabilities needed for the safe operations of defense nuclear facilities.

  15. Federal Geothermal Research Program Update - Fiscal Year 2004

    SciTech Connect (OSTI)

    Patrick Laney

    2005-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermal electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently possible or economical.

  16. Federal Geothermal Research Program Update Fiscal Year 2004

    SciTech Connect (OSTI)

    Not Available

    2005-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermal electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently possible or economical.

  17. Water and Heat Balance Model for Predicting Drainage Below the Plant Root Zone

    Energy Science and Technology Software Center (OSTI)

    1989-11-01

    UNSAT-H Version 2.0 is a one-dimensional model that simulates the dynamic processes of infiltration, drainage, redistribution, surface evaporation, and the uptake of water from soil by plants. The model was developed for assessing the water dynamics of arid sites used or proposed for near-surface waste disposal. In particular, the model is used for simulating the water balance of cover systems over buried waste and for estimating the recharge rate (i.e., the drainage rate beneath themore » plant root zone when a sizable vadose zone is present). The mathematical base of the model are Richards'' equation for water flow, Ficks'' law for vapor diffusion, and Fouriers law for heat flow. The simulated profile can be homogeneous or layered. The boundary conditions can be controlled as either constant (potential or temperature) or flux conditions to reflect actual conditions at a given site.« less

  18. Aqueous precipitation: Population balance modeling and control in multi-cation systems

    SciTech Connect (OSTI)

    Voigt, J.A.

    1996-03-01

    Efficient separation of metal species from aqueous streams by precipitation techniques requires a fundamental understanding of the processes that occur during precipitation. These processes include particle nucleation, particle growth by solute deposition, agglomerate formation, and agglomerate breakup. Population balance method has been used to develop a kinetic model that accounts for these competing kinetic processes. The usefulness of the model is illustrated through its application to precipitation of yttrium hydroxynitrate, YHN. Kinetic parameters calculated from the model equations and system-specific solution chemistry are used to describe several aspects of the effect of pH on YHN precipitation. Implications for simultaneous precipitation of more than one cation type are discussed with examples. Effects of solution chemistry, precipitator design, and solvent choice are considered.

  19. Kinetically balanced Gaussian basis-set approach to relativistic Compton profiles of atoms

    SciTech Connect (OSTI)

    Jaiswal, Prerit; Shukla, Alok

    2007-02-15

    Atomic Compton profiles (CPs) are a very important property which provide us information about the momentum distribution of atomic electrons. Therefore, for CPs of heavy atoms, relativistic effects are expected to be important, warranting a relativistic treatment of the problem. In this paper, we present an efficient approach aimed at ab initio calculations of atomic CPs within a Dirac-Hartree-Fock (DHF) formalism, employing kinetically balanced Gaussian basis functions. The approach is used to compute the CPs of noble gases ranging from He to Rn, and the results have been compared to the experimental and other theoretical data, wherever possible. The influence of the quality of the basis set on the calculated CPs has also been systematically investigated.

  20. Closing the Carbon Balance for Fermentation by Clostridium thermocellum (ATCC 27405)

    SciTech Connect (OSTI)

    Ellis, Lucas D; Holwerda, Evert K; Hogsett, David; Rogers, Steve; Shao, Xiongjun; Tschaplinski, Timothy J; Thorne, Phil; Lynd, L.

    2012-01-01

    Our lab and most others have not been able to close a carbon balance for fermentation by the thermophilic, cellulolytic anaerobe, Clostridium thermocellum. We undertook a detailed accounting of product formation in C. thermocellum ATCC 27405. Elemental analysis revealed that for both cellulose (Avicel) and cellobiose, {>=}92% of the substrate carbon utilized could be accounted for in the pellet, supernatant and off-gas when including sampling. However, 11.1% of the original substrate carbon was found in the liquid phase and not in the form of commonly-measured fermentation products - ethanol, acetate, lactate, and formate. Further detailed analysis revealed all the products to be <720 da and have not usually been associated with C. thermocellum fermentation, including malate, pyruvate, uracil, soluble glucans, and extracellular free amino acids. By accounting for these products, 92.9% and 93.2% of the final product carbon was identified during growth on cellobiose and Avicel, respectively.

  1. Approach to IAEA material-balance verification at the Portsmouth Gas Centrifuge Enrichment Plant

    SciTech Connect (OSTI)

    Gordon, D.M.; Sanborn, J.B.; Younkin, J.M.; DeVito, V.J.

    1983-01-01

    This paper describes a potential approach by which the International Atomic Energy Agency (IAEA) might verify the nuclear-material balance at the Portsmouth Gas Centrifuge Enrichment Plant (GCEP). The strategy makes use of the attributes and variables measurement verification approach, whereby the IAEA would perform independent measurements on a randomly selected subset of the items comprising the U-235 flows and inventories at the plant. In addition, the MUF-D statistic is used as the test statistic for the detection of diversion. The paper includes descriptions of the potential verification activities, as well as calculations of: (1) attributes and variables sample sizes for the various strata, (2) standard deviations of the relevant test statistics, and (3) the detection sensitivity which the IAEA might achieve by this verification strategy at GCEP.

  2. Electrical Power Grid Delivery Dynamic Analysis: Using Prime Mover Engines to Balance Dynamic Wind Turbine Output

    SciTech Connect (OSTI)

    Diana K. Grauer; Michael E. Reed

    2011-11-01

    This paper presents an investigation into integrated wind + combustion engine high penetration electrical generation systems. Renewable generation systems are now a reality of electrical transmission. Unfortunately, many of these renewable energy supplies are stochastic and highly dynamic. Conversely, the existing national grid has been designed for steady state operation. The research team has developed an algorithm to investigate the feasibility and relative capability of a reciprocating internal combustion engine to directly integrate with wind generation in a tightly coupled Hybrid Energy System. Utilizing the Idaho National Laboratory developed Phoenix Model Integration Platform, the research team has coupled demand data with wind turbine generation data and the Aspen Custom Modeler reciprocating engine electrical generator model to investigate the capability of reciprocating engine electrical generation to balance stochastic renewable energy.

  3. Variable Renewable Generation can Provide Balancing Control to the Electric Power System (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-09-01

    As wind and solar plants become more common in the electric power system, they may be called on to provide grid support services to help maintain system reliability. For example, through the use of inertial response, primary frequency response, and automatic generation control (also called secondary frequency response), wind power can provide assistance in balancing the generation and load on the system. These active power (i.e., real power) control services have the potential to assist the electric power system in times of disturbances and during normal conditions while also potentially providing economic value to consumers and variable renewable generation owners. This one-page, two-sided fact sheet discusses the grid-friendly support and benefits renewables can provide to the electric power system.

  4. A mass balance model for the hydrologic response of fine-grained hillside soils to rainfall

    SciTech Connect (OSTI)

    Haneberg, W.C. . New Mexico Bureau of Mines and Mineral Resources)

    1992-01-01

    For a sloping soil layer of uniform thickness D, length L, and angle of inclination B, slope-normal influx per unit breadth is given by Q[sub in] = R L cos B, where R is net recharge. Slope-parallel discharge is given by Q[sub out] = K D sin B, where K is saturated hydraulic conductivity. If the long-term ratio of discharge to influx is > 1, then the slope is self-draining. If the ratio is < 1, then the slope is self-filling. Self-filling slopes will be more susceptible to failure because they cannot easily dissipate infiltration-induced pore pressure increases. For time-variant recharge, the rate of change in volumetric soil moisture content is given by d[Theta]/dt = (R/D) cos B--(K/L) sin B. Calculations using data from a thin colluvium landslide along the Ohio River give an average annual steady-state value of Q[sub out]/Q[sub in] = 1.06. A finite difference solution of the transient mass balance equation agrees fairly well with observed daily mean pressure heads from spring 1988. Stochastic simulations using temporally uncorrelated rainfall distributions fitted to the observed data tend to produce smoother hydrographs than simulations using observed rainfall values. This is due to a mismatch between the observed and fitted distributions, which caused the frequency of large storms to be underestimated and the frequency of small storms to be overestimated. Long-term trends in the stochastic simulations, however, were self-draining in three out of five trials. The mildly self-draining nature of thin colluvium hillsides along the Ohio River may explain why these slopes are marginally stable to unstable, and the general agreement between observed and simulated values suggests that mass balance models may be useful for assessing the susceptibility of hillside soils to precipitation-induced landsliding.

  5. A comparison of two models for simulating the water balance of soil covers under semi-arid conditions

    SciTech Connect (OSTI)

    Chammas, G.A.; Geddis, M.; McCaulou, D.R.

    1999-07-01

    Numerical water-balance modeling of store-and-release soil covers for hypothetical mine tailings was conducted using the Hydrologic Evaluation of Landfill Performance (HELP) and SoilCover models. The objective of the modeling was to compare the utility of both models in a semi-arid environment. Although values for input parameters were chosen to make simulations as identical as possible between models, differences in model solution methods and discretization led to different water-balance predictions. Specifically, SoilCover predicted less percolation than HELP, because HELP uses simplified water-routing algorithms which may over predict infiltration and under predict subsequent evapotranspiration. Since SoilCover explicitly solves physically based governing equations for heat and water flow, its predictions more accurately represent the water balance in semi-arid regions where evapotranspiration dominates, HELP can only conservatively predict percolation in dry environments.

  6. 1999 Commercial Building Characteristics--Detailed Tables--Year...

    U.S. Energy Information Administration (EIA) Indexed Site

    Year Constructed > Detailed Tables-Year Constructed Complete Set of 1999 CBECS Detailed Tables Detailed Tables-Year Constructed Table B8. Year Constructed, Number of Buildings...

  7. Quantification of uranium transport away from firing sites at Los Alamos National Laboratory: A mass balance approach

    SciTech Connect (OSTI)

    Becker, N.M.

    1992-01-01

    Investigations were conducted at Los Alamos National Laboratory to quantify the extent of migration of depleted uranium away from firing sites. Extensive sampling of air particles, soil, sediment, and water was conducted to establish the magnitude of uranium contamination throughout one watershed. The uranium source term was estimated, and mass balance calculations were performed to compare the percentage of migrated uranium with original expenditures. Mass balance calculations can be powerful in identification of the extent of waste migration and used as an aid in planning future waste investigations.

  8. Quantification of uranium transport away from firing sites at Los Alamos National Laboratory: A mass balance approach

    SciTech Connect (OSTI)

    Becker, N.M.

    1992-02-01

    Investigations were conducted at Los Alamos National Laboratory to quantify the extent of migration of depleted uranium away from firing sites. Extensive sampling of air particles, soil, sediment, and water was conducted to establish the magnitude of uranium contamination throughout one watershed. The uranium source term was estimated, and mass balance calculations were performed to compare the percentage of migrated uranium with original expenditures. Mass balance calculations can be powerful in identification of the extent of waste migration and used as an aid in planning future waste investigations.

  9. Biotic Processes Regulating the Carbon Balance of Desert Ecosystems - Final Report

    SciTech Connect (OSTI)

    Nowak, Robert S; Smith, Stanley D; Evans, Dave; Ogle, Kiona; Fenstermaker, Lynn

    2012-12-13

    Our results from the 10-year elevated atmospheric CO{sub 2} concentration study at the Nevada Desert FACE (Free-air CO{sub 2} Enrichment) Facility (NDFF) indicate that the Mojave Desert is a dynamic ecosystem with the capacity to respond quickly to environmental changes. The Mojave Desert ecosystem is accumulating carbon (C), and over the 10-year experiment, C accumulation was significantly greater under elevated [CO{sub 2}] than under ambient, despite great fluctuations in C inputs from year to year and even apparent reversals in which [CO{sub 2}] treatment had greater C accumulations.

  10. Calendar Year 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Calendar Year 2016 Calendar Year 2016 May 6, 2016 Audit Report: OAI-FS-16-09 Management Letter on the Western Federal Power System's Fiscal Year 2015 Financial Statement Audit May 6, 2016 Inspection Report: OAI-L-16-09 Review of Management and Accountability of Sealed Radioactive Sources Maintained at Department Sites May 2, 2016 Audit Report: DOE-OIG-16-12 The Department of Energy's Energy Information Technology Services Federal Support Costs April 26, 2016 Special Report: OIG-SR-16-02 The

  11. Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End

    Energy Savers [EERE]

    Summary Report | Department of Energy 3 Year-End Summary Report Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011-2020 Strategic Plan (DOE 2011). PDF icon Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report More Documents & Publications Long-Term Surveillance Operations and Maintenance Fiscal Year

  12. PHMC Year 2000: Status reporting for mission essential Year 2000 projects. Revision 0, Volume 3

    SciTech Connect (OSTI)

    Layfield, K.A.

    1998-09-02

    The PHMC Year 2000 status reporting process is designed to encompass the reporting requirements of the Office of Management and Budget (OMB), DOE HQ, RL and the PHMC for mission essential Year 2000 projects. Status reporting is required for all Year 2000 projects. The Year 2000 project list will be maintained current as Year 2000 projects are modified, added or deleted. Reporting is required until a Year 2000 project has completed compliance assurance. Some projects will be identified as DOE HQ reportable. These are projects determined to be the most critical and due the attention of DOE HQ.

  13. 2015 NCAI Mid-Year Conference

    Broader source: Energy.gov [DOE]

    The National Congress of American Indians is hosting their annual mid-year conference in St. Paul, Minnesota, on June 28-July 1, 2015. This event features subcommittee meetings, booths, and more.

  14. Fiscal Year 2008 Budget-in-Brief

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency and Renewable Energy Fiscal Year 2008 Budget-in-Brief www.eere.energy.gov TABLE OF CONTENTS Page Preface...................................................................................................................................................... 3 Biomass and Biorefinery Systems R&D Program.................................................................................. 6 Building Technologies Program

  15. Classification CommuniQué- Year: 2013

    Broader source: Energy.gov [DOE]

    Classification newsletters for the year 2013, consisting of the following issues: CommuniQué 2013-1 - Spring 2013 CommuniQué 2013-2 - Fall 2013

  16. Mo Year Report Period: EIA ID NUMBER:

    U.S. Energy Information Administration (EIA) Indexed Site

    Mo Year Report Period: EIA ID NUMBER: http:www.eia.govsurveyformeia14instructions.pdf Mailing Address: Secure File Transfer option available at: (e.g., PO Box, RR) https:...

  17. Calendar Year 1999 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 25, 1999 Audit Report: ER-FS-99-01 Results of Audit Procedures Performed at Chicago Operations Office During the Audit of the Department's Consolidated Fiscal Year 1998...

  18. EERE Fiscal Year 2012 Website Annual Report

    Broader source: Energy.gov (indexed) [DOE]

    At the end of Fiscal Year 2012 (FY12), the EERE Web enterprise consisted of 152 websites ... to begin the process of aligning its Web presence with energy.gov, DOE's central website. ...

  19. EERE Fiscal Year 2011 Website Annual Report

    Broader source: Energy.gov (indexed) [DOE]

    Views 05 Average Visit Duration 06 Top 20 Web Sites by Visits 06 Top 20 Visited Pages 07 ... At the end of fiscal year 2011 (FY11), the EERE Web enterprise consisted of more than 170 ...

  20. Webtrends Archives by Fiscal Year — Vehicles

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Vehicle Technologies Office, Webtrends archives for the site, including the Alternative Fuels Data Center, EPAct Transportation Regulatory Activities, and Clean Cities by fiscal year.

  1. Four Years of Leadership with Secretary Chu

    Broader source: Energy.gov [DOE]

    For more than four years, he has provided remarkable leadership in pursuing both President Obama’s nuclear security agenda as well as an all-of-the-above approach to energy that invests in clean...

  2. Ten Year Site Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the Department of Energy's overall strategic ...

  3. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved...

  4. Profiling 1366 Technologies: One Year Later

    Broader source: Energy.gov [DOE]

    Last January, we took a look at how ARPA-E performer, 1366 Technologies is working to dramatically reduce the cost of solar energy. A year later, we revisited their headquarters in Lexington, MA to...

  5. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure of TaAs. The results exhibit the features-cones, nodes, and arcs-that

  6. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure of TaAs. The results exhibit the features-cones, nodes, and arcs-that

  7. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure of TaAs. The results exhibit the features-cones, nodes, and arcs-that

  8. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure of TaAs. The results exhibit the features-cones, nodes, and arcs-that

  9. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure of TaAs. The results exhibit the features-cones, nodes, and arcs-that

  10. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure of TaAs. The results exhibit the features-cones, nodes, and arcs-that

  11. Multi-Year Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Year Schedule Multi-Year Schedule Table 2 presents DOE's currently scheduled rulemaking activities for energy conservation standards and test procedures. PDF icon multiyear_schedule_aug_2011.pdf More Documents & Publications 9th Semi-Annual Report to Congress on Appliance Energy Efficiency Rulemakings - Implementation Report: Energy Conservation Standards Activities 11th Semi-Annual Report to Congress on Appliance Energy Efficiency Rulemakings - Implementation Report: Energy Conservation

  12. Calendar Year 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Calendar Year 2012 December 21, 2012 Audit Report: OAS-L-13-03 The Management of the Plateau Remediation Contract December 21, 2012 Audit Report: IG-0879 Naval Reactors Information Technology System Development Efforts December 17, 2012 Audit Report: OAS-FS-13-08 Management Letter on the Audit of the Department of Energy's Consolidated Financial Statements for Fiscal Year 2012 December 11, 2012 Audit Report: IG-0878 Follow-up Audit of the Department's Cyber Security Incident Management Program

  13. LDRD Project Mid-Year Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics potential of polarized light ions with EIC@JLab Principal Investigator: C. Weiss (JLab Theory) Project Status Project work continued into FY15 with the same personnel as in FY14 (JLab investigators, 50% FTE postdoc shared with Old Dominion U., visitors). Following demonstration of feasibility of spectator tagging in the 1st project year, 2nd year efforts so far focused mainly on physics extraction, strengthening the theoretical framework, and outreach. Theory agenda and schedule had to

  14. NERSC's Names and Logos over the Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    names and logos over the years NERSC's Names and Logos over the Years April 16, 2014 by Francesca Verdier NERSC's name and logos have changed over the decades, reflecting the center's increasingly broad scientific mission. Founded in 1974 at Lawrence Livermore National Laboratory (LLNL) as the Controlled Thermonuclear Research Computer Center, NERSC has evolved from its early days supporting magnetic fusion research at LLNL to providing supercomputing resources across a spectrum of scientific

  15. Publications by Year | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publications by Year Publications by Year 2016 Adams NBP, Vasilev C, Brindley AA, and Hunter CN (2016) Nanomechanical and thermophoretic analyses of the nucleotide-dependent interactions between the AAA subunits of magnesium chelatase. Journal of the American Chemical Society. In press. Bandyopadhyay A, Elvitigala T, Liberton M, and Pakrasi HB (2016) Variations in the Rhythms of Respiration and Nitrogen Fixation in Members of the Unicellular Diazotrophic Cyanobacterial Genus Cyanothece. Plant

  16. Environmental releases for calendar year 1996

    SciTech Connect (OSTI)

    Greager, E.M.

    1997-07-31

    This report presents data on radioactive and nonradioactive materials released into the environment during calendar year 1996 from facilities and activities managed by the Fluor Daniel Hanford, Incorporated (formerly the Westinghouse Hanford Company) and Bechtel Hanford, Incorporated. Fluor Daniel Hanford, Incorporated provides effluent monitoring services for Bechtel Hanford, Incorporated, which includes release reporting. Both summary and detailed presentations of the environmental releases are provided. When appropriate, comparisons to data from previous years are made.

  17. Environmental releases for calendar year 1995

    SciTech Connect (OSTI)

    Diediker, L.P., Westinghouse Hanford

    1996-07-30

    This report presents data on radioactive and nonradioactive materials released into the environment during calendar year 1995 from facilities managed by the Westinghouse Hanford Company (WHC) and monitored by Bechtel Hanford, Incorporated (BHI). WHC provides effluent monitoring services for BHI, which includes release reporting. Both summary and detailed presentations of the environmental releases are provided. When appropriate,comparisons to data from previous years are made.

  18. Lab completes record year for environmental cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Record year for environmental cleanup Lab completes record year for environmental cleanup Personnel conducted more field investigations and cleanup campaigns than ever and completed a record number of Lab shipments to WIPP. December 16, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new

  19. 10 Years ON: From the Lab to the Real World in 10 Years | GE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Years ON: From the Lab to the Real World in 10 Years Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new ...

  20. Global energy and water balance: Characteristics from finite-volume atmospheric model of the IAP/LASG (FAMIL1)

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Zhou, Linjiong; Bao, Qing; Liu, Yimin; Wu, Guoxiong; Wang, Wei-Chyung; Wang, Xiaocong; He, Bian; Yu, Haiyang; Li, Jiandong

    2015-03-01

    This paper documents version 1 of the Finite-volume Atmospheric Model of the IAP/LASG (FAMIL1), which has a flexible horizontal resolution up to a quarter of 1°. The model, currently running on the ‘‘Tianhe 1A’’ supercomputer, is the atmospheric component of the third-generation Flexible Global Ocean-Atmosphere-Land climate System model (FGOALS3) which will participate in the Coupled Model Intercomparison Project Phase 6 (CMIP6). In addition to describing the dynamical core and physical parameterizations of FAMIL1, this paper describes the simulated characteristics of energy and water balances and compares them with observational/reanalysis data. The comparisons indicate that the model simulates well the seasonalmore » and geographical distributions of radiative fluxes at the top of the atmosphere and at the surface, as well as the surface latent and sensible heat fluxes. A major weakness in the energy balance is identified in the regions where extensive and persistent marine stratocumulus is present. Analysis of the global water balance also indicates realistic seasonal and geographical distributions with the global annual mean of evaporation minus precipitation being approximately 10⁻⁵ mm d⁻¹. We also examine the connections between the global energy and water balance and discuss the possible link between the two within the context of the findings from the reanalysis data. Finally, the model biases as well as possible solutions are discussed.« less

  1. Building America Technology Solutions for New and Existing Homes: Balancing Hydronic Systems in Multifamily Buildings, Chicago, Illinois (Fact Sheet)

    Broader source: Energy.gov [DOE]

    In this case study , Partnership for Advanced Residential Retrofit and Elevate Energy. explores cost-effective distribution upgrades and balancing measures in multifamily hydronic systems, providing a resource to contractors, auditors, and building owners on best practices to improve tenant comfort and lower operating costs.

  2. Global energy and water balance: Characteristics from finite-volume atmospheric model of the IAP/LASG (FAMIL1)

    SciTech Connect (OSTI)

    Zhou, Linjiong; Bao, Qing; Liu, Yimin; Wu, Guoxiong; Wang, Wei-Chyung; Wang, Xiaocong; He, Bian; Yu, Haiyang; Li, Jiandong

    2015-03-01

    This paper documents version 1 of the Finite-volume Atmospheric Model of the IAP/LASG (FAMIL1), which has a flexible horizontal resolution up to a quarter of 1°. The model, currently running on the ‘‘Tianhe 1A’’ supercomputer, is the atmospheric component of the third-generation Flexible Global Ocean-Atmosphere-Land climate System model (FGOALS3) which will participate in the Coupled Model Intercomparison Project Phase 6 (CMIP6). In addition to describing the dynamical core and physical parameterizations of FAMIL1, this paper describes the simulated characteristics of energy and water balances and compares them with observational/reanalysis data. The comparisons indicate that the model simulates well the seasonal and geographical distributions of radiative fluxes at the top of the atmosphere and at the surface, as well as the surface latent and sensible heat fluxes. A major weakness in the energy balance is identified in the regions where extensive and persistent marine stratocumulus is present. Analysis of the global water balance also indicates realistic seasonal and geographical distributions with the global annual mean of evaporation minus precipitation being approximately 10⁻⁵ mm d⁻¹. We also examine the connections between the global energy and water balance and discuss the possible link between the two within the context of the findings from the reanalysis data. Finally, the model biases as well as possible solutions are discussed.

  3. HLW flowsheet material balance for DWPF rad operation with Tank 51 sludge and ITP Cycle 1 precipitate

    SciTech Connect (OSTI)

    Choi, A.S.

    1995-04-19

    This document presents the details of the Savannah River Plant Flowsheet for the Rad Operation with Tank Sludge and ITP Cycle 1 Precipitate. Topics discussed include: material balance; radiolysis chemistry of tank precipitates; algorithm for ESP washing; chemistry of hydrogen and ammonia generation in CPC; batch sizes for processing feed; and total throughput of a streams during one cycle of operation.

  4. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission and Distribution Programs. | Department of Energy Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development

  5. Control and Size Energy Storage for Managing Energy balance of Variable Generation Resources

    SciTech Connect (OSTI)

    Ke, Xinda; Lu, Ning; Jin, Chunlian

    2015-01-01

    This paper presents control algorithms and sizing strategies for using energy storage to manage energy balance for variable generation resources. The control objective is to minimize the hourly generation imbalance between the actual and the scheduled generation of the wind farm. Three control algorithms are compared: tracking power imbalance, post-compensation, and pre-compensation. Measurement data from a wind farm located in South-central Washington State are used in the study. The results show that tracking power imbalance yields the best performance by keeping the hourly energy imbalances zero. However, the energy storage system (ESS) will be significantly oversized. Post-compensation reduces power rating of the ESS but the hourly imbalance may not be kept as zero when large and long-lasting energy imbalances occur. A linear regression forecasting algorithm is developed for the pre-compensation algorithm to pre-charge or pre-discharge the ESS based on predicted energy imbalances. The performance comparison shows that the pre-compensation method significantly reduces the size of the ESS while maintaining satisfactory performance.

  6. Offshore Wind Plant Balance-of-Station Cost Drivers and Sensitivities (Poster)

    SciTech Connect (OSTI)

    Saur, G.; Maples, B.; Meadows, B.; Hand, M.; Musial, W.; Elkington, C.; Clayton, J.

    2012-09-01

    With Balance of System (BOS) costs contributing up to 70% of the installed capital cost, it is fundamental to understanding the BOS costs for offshore wind projects as well as potential cost trends for larger offshore turbines. NREL developed a BOS model using project cost estimates developed by GL Garrad Hassan. Aspects of BOS covered include engineering and permitting, ports and staging, transportation and installation, vessels, foundations, and electrical. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and soil type. Based on the new BOS model, an analysis to understand the non-turbine costs associated with offshore turbine sizes ranging from 3 MW to 6 MW and offshore wind plant sizes ranging from 100 MW to 1000 MW has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of offshore wind project BOS, and explores the sensitivity of the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrates the potential impact of turbine size and project size on the cost of energy from US offshore wind plants.

  7. Preliminary energy balance and economic of a farm-scale ethanol plant

    SciTech Connect (OSTI)

    Jantzen, D.; McKinnon, T.

    1980-05-01

    A small-scale ethanol plant was designed, built, tested, and modified over the past 18 months. The plant currently operating is the second design. A third, and probably final, design will be installed and operating within a few months. The current plant produces approximately 30 gal/hr of 190-proof alcohol on a continuous basis. The new plant will produce 50 gal/hr of 200-proof alcohol. A key feature is the relatively low process heat requirement, which is achieved by extensive use of waste-heat recovery heat exchangers. This is manifested in the low temperatures of the process output streams. Acting on the request of the Office of Alcohol Fuels, US Department of Energy, and at the invitation of the owners, representatives from the Solar Energy Research Institute evaluated the energy balance on the plant. The objective was to help clear up the controversy surrounding the net energy benefit of ethanol production. Although the study was site-specific to the plant and limited in scope, it is indicative of the potential performance of grain-to-ethanol plants in general.

  8. Land-Based Wind Plant Balance-of-System Cost Drivers and Sensitivities (Poster)

    SciTech Connect (OSTI)

    Mone, C.; Maples, B.; Hand, M.

    2014-04-01

    With Balance of System (BOS) costs contributing up to 30% of the installed capital cost, it is fundamental to understand the BOS costs for wind projects as well as potential cost trends for larger turbines. NREL developed a BOS model using project cost estimates developed by industry partners. Aspects of BOS covered include engineering and permitting, foundations for various wind turbines, transportation, civil work, and electrical arrays. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and geographic characteristics. Based on the new BOS model, an analysis to understand the non‐turbine wind plant costs associated with turbine sizes ranging from 1-6 MW and wind plant sizes ranging from 100-1000 MW has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of wind project BOS, and explores the sensitivity of the capital investment cost and the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrate the potential impact of turbine size and project size on the cost of energy from US wind plants.

  9. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    SciTech Connect (OSTI)

    Ballinger, M.Y.; Shields, K.D.

    1999-04-02

    The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not have individual FEMPs. The remainder of the DOE-owned, PNNL-operated facilities are referred to as Balance-of-Plant (BOP) facilities. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R and D. R and D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in the FEMP.

  10. A water balance study of four landfill cover designs varying in slope for semiarid regions

    SciTech Connect (OSTI)

    Nyhan, J.W.; Schofield, T.G.; Salazar, J.A.

    1997-02-01

    The goal of disposing of radioactive and hazardous waste in shallow landfills is to reduce risk to human health and to the environment by isolating contaminants until they no longer pose a hazard. In order to achieve this, the performance of a landfill cover design without an engineered barrier (Conventional Design) was compared with three designs containing either a hydraulic barrier (EPA Design) or a capillary barrier (Loam and Clay Loam Capillary Barrier Designs). Water balance parameters were measured since 1991 at six-hour intervals for four different landfill cover designs in 1.0- by 10.0-m plots with downhill slopes of 5, 10, 15, and 25%. Whereas runoff generally accounted for only 2-3% of the precipitation losses on these designs, similar values for evapotranspiration ranged from 86% to 91%, with increased evapotranspiration occurring with increases in slope. Consequently, interflow and seepage usually decreased with increasing slope for each landfill cover design. Seepage consisted of up to 10% of the precipitation on the Conventional Design, whereas the hydraulic barrier in the EPA Design effectively controlled seepage at all slopes, and both of the capillary designs worked effectively to eliminate seepage at the higher slopes.

  11. U.S. Balance-of-Station Cost Drivers and Sensitivities (Presentation)

    SciTech Connect (OSTI)

    Maples, B.

    2012-10-01

    With balance-of-system (BOS) costs contributing up to 70% of the installed capital cost, it is fundamental to understanding the BOS costs for offshore wind projects as well as potential cost trends for larger offshore turbines. NREL developed a BOS model using project cost estimates developed by GL Garrad Hassan. Aspects of BOS covered include engineering and permitting, ports and staging, transportation and installation, vessels, foundations, and electrical. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and soil type. Based on the new BOS model, an analysis to understand the non‐turbine costs has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of offshore wind project BOS, and explores the sensitivity of the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrates the potential impact of turbine size and project size on the cost of energy from U.S. offshore wind plants.

  12. Drill string splined resilient tubular telescopic joint for balanced load drilling of deep holes

    SciTech Connect (OSTI)

    Garrett, W.R.

    1981-08-04

    A drill string splined resilient tubular telescopic joint for balanced load deep well drilling comprises a double acting damper having a very low spring rate upon both extension and contraction from the zero deflection condition. Preferably the spring means itself is a double acting compression spring means wherein the same spring means is compressed whether the joint is extended or contracted. The damper has a like low spring rate over a considerable range of deflection, both upon extension and contraction of the joint, but a gradually then rapidly increased spring rate upon approaching the travel limits in each direction. Stacks of spring rings are employed for the spring means, the rings being either shaped elastomer-metal sandwiches or, preferably, roller belleville springs. The spline and spring means are disposed in an annular chamber formed by mandrel and barrel members constituting the telescopic joint. The spring rings make only such line contact with one of the telescoping members as is required for guidance therefrom, and no contact with the other member. The chamber containing the spring means, and also containing the spline means, is filled with lubricant, the chamber being sealed with a pressure seal at its lower end and an inverted floating seal at its upper end. Magnetic and electrical means are provided to check for the presence and condition of the lubricant. To increase load capacity the spring means is made of a number of components acting in parallel.

  13. Drill string splined resilient tubular telescopic joint for balanced load drilling of deep holes

    SciTech Connect (OSTI)

    Garrett, W.R.

    1984-03-06

    A drill string splined resilient tubular telescopic joint for balanced load deep well drilling comprises a double acting damper having a very low spring rate upon both extension and contraction from the zero deflection condition. Stacks of spring rings are employed for the spring means, the rings being either shaped elastomer-metal sandwiches or, preferably, roller Belleville springs. The spline and spring means are disposed in an annular chamber formed by mandrel and barrel members constituting the telescopic joint. The chamber containing the spring means, and also containing the spline means, is filled with lubricant, the chamber being sealed with a pressure seal at its lower end and an inverted floating seal at its upper end. A prototype includes of this a bellows seal instead of the floating seal at the upper end of the tool, and a bellows in the side of the lubricant chamber provides volume compensation. A second lubricant chamber is provided below the pressure seal, the lower end of the second chamber being closed by a bellows seal and a further bellows in the side of the second chamber providing volume compensation. Modifications provide hydraulic jars.

  14. Contaminant Mass Balance for Sinclair and Dyes Inlets, Puget Sound, WA

    SciTech Connect (OSTI)

    Crecelius, Eric A.; Johnston, Robert K.; Leather, Jim; Guerrero, Joel; Miller, Martin C.; Brandenberger, Jill M.

    2003-04-03

    Sinclair Inlet and Dyes Inlets have historically received contaminates from military installations, industrial activities, municipal outfalls, and other nonpoint sources. For the purpose of determining a ?total maximum daily load? (TMDL) of contaminants for the Inlets, a contaminant mass balance for the sediments is being developed. Sediment cores and traps were collected from depositional areas of the Inlets and surface sediment grabs were collected from fluvial deposits associated with major drainage areas into the Inlets. All sediment samples were screened using X-Ray fluorescence (XRF) for metals, UV fluorescence for organics (PAHs), and immunoassay for PCBs. A subset of split-samples was analyzed using ICP/MS for metals and GC/MS for phthalates, PAHs, and PCBs. Sediment cores were age-dated using radionuclides to determine the sedimentation rate and the history of sediment contamination. Streams and storm water outfalls were sampled in both the wet and dry seasons to assess loading from the watershed. Seawater samples collected from the marine waters of the Inlets and boundary passages to central Puget Sound were used to estimate the exchange of contaminates with central Puget Sound. The historical trends from the cores indicate that contamination was at a maximum in the middle of the 1900s and decreased significantly by the late 1900s. The thickness of the contaminated sediment is in the range of 30 to 50 cm.

  15. Anisotropic emission and photon-recycling in strain-balanced quantum well solar cells

    SciTech Connect (OSTI)

    Cabrera, C. I.; Enciso, A.; Contreras-Solorio, D. A.; Hernandez, L.; Connolly, J. P.

    2014-04-28

    Strain-balanced quantum well solar cells (SB-QWSCs) extend the photon absorption edge beyond that of bulk GaAs by incorporation of quantum wells in the i-region of a pin device. Anisotropy arises from a splitting of the valence band due to compressive strain in the quantum wells, suppressing a transition which contributes to emission from the edge of the quantum wells. We have studied both the emission light polarized in the plane perpendicular (TM) to the quantum well which couples exclusively to the light hole transition and the emission polarized in the plane of the quantum wells (TE) which couples mainly to the heavy hole transition. It was found that the spontaneous emission rates TM and TE increase when the quantum wells are deeper. The addition of a distributed Bragg reflector can substantially increase the photocurrent while decreasing the radiative recombination current. We have examined the impact of the photon recycling effect on SB-QWSC performance. We have optimized SB-QWSC design to achieve single junction efficiencies above 30%.

  16. Waste management fiscal year 1998 progress report

    SciTech Connect (OSTI)

    1998-12-31

    The Waste Management Program is pleased to issue the Fiscal Year 1998 Progress Report presenting program highlights and major accomplishments of the last year. This year-end update describes the current initiatives in waste management and the progress DOE has made toward their goals and objectives, including the results of the waste management annual performance commitments. One of the most important program efforts continues to be opening the Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico, for the deep geologic disposal of transuranic waste. A major success was achieved this year by the West Valley Demonstration Project in New York, which in June completed the project`s production phase of high-level waste processing ahead of schedule and under budget. Another significant accomplishment this year was the award of two privatization contracts for major waste management operations, one at Oak ridge for transuranic waste treatment, and one at Hanford for the Tank Waste Remediation System privatization project. DOE is proud of the progress that has been made, and will continue to pursue program activities that allow it to safely and expeditiously dispose of radioactive and hazardous wastes across the complex, while reducing worker, public, and environmental risks.

  17. Subsea completions: A record year in '93

    SciTech Connect (OSTI)

    Mohr, H.O. )

    1994-02-01

    Review of subsea completion statistics for 1993 shows 78 installations--an 18% increase over the previous all-time high of 66 installations during 1985. Risking some dramatics, the 78 installations during '93 represent a 73% increase over the 45 installations during '92. And enthusiasm and positive outlook for continued application of subsea completions is clearly indicated in all major areas of the offshore world. Data suggest that the activity should continue to rise strongly toward the year 2000. At the end of 1993, the number of future subsea completions identified for installation during the next 10 years is 1,315--up 15% from the 1,144 identified at year-end 1992. The next highest number identified was 1,083 at the end of 1989, supporting a positive trend.

  18. Year 2000 TWRS Maintenance procedure review report

    SciTech Connect (OSTI)

    ADAMS, M.R.

    1999-02-24

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K.

  19. After 5 Years, NERSC's Franklin Retires

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    After 15 Years, A New Top Earning Patent At Ames Lab After 15 Years, A New Top Earning Patent At Ames Lab January 20, 2012 - 11:32am Addthis Ames Laboratory senior metallurgist Iver Anderson explains the importance of lead-free solder in taking hazardous lead out of the environment by eliminating it from discarded computers and electronics that wind up in landfills. Anderson led a team that developed a tin-silver-copper replacement for traditional lead solder that has been adopted by more than

  20. Contract Periods of Performance Exceeding 5 Years

    Broader source: Energy.gov [DOE]

    Acquisition Letter 2010-5 has been revised to update references, make minor editorial changes, and clarify that the Director, Field Assistance and Oversight Division is the approval authority within Department of Energy for acquisition plans that contemplate a period of performance greater than 5 years.

  1. Capping blowouts from Iran's 8-year war

    SciTech Connect (OSTI)

    Sayers, B. )

    1991-07-01

    Control well blown up by the Iraqi military were a 2 1/2 year legacy left the National Iranian Oil Co. at the end of this long conflict. This final installment of a 2-part series describes capping of the largest wind oil well.

  2. Draft Multi-Year Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energys Building Technologies Office (BTO) has released its draft Multi-Year Program Plan (MYPP) for public comment. The draft MYPP provides a broad overview of buildings energy use and efficiency opportunities, and the strategies and goals of BTO to substantially accelerate the rate of efficiency improvements in both new and existing residential and commercial buildings.

  3. Profiling 1366 Technologies: One Year Later

    ScienceCinema (OSTI)

    Van Mierlo, Frank; Sachs, Ely;

    2013-05-29

    Last January, we took a look at how ARPA-E performer, 1366 Technologies is working to dramatically reduce the cost of solar energy. A year later, we revisited their headquarters in Lexington, MA to see the progress they've made.

  4. The first forty years, 1947-1987

    SciTech Connect (OSTI)

    Rowe, M.S.; Cohen, A.; Petersen, B.

    1987-01-01

    This report commemorates the fortieth anniversary of Brookhaven National Laboratory by representing a historical overview of research at the facility. The chapters of the report are entitled: The First Forty Years, Brookhaven: A National Resource, Fulfilling a Mission - Brookhaven's Mighty Machines, Marketing the Milestones in Basic Research, Meeting National Needs, Making a Difference in Everyday Life, and Looking Forward.

  5. Profiling 1366 Technologies: One Year Later

    SciTech Connect (OSTI)

    Van Mierlo, Frank; Sachs, Ely

    2011-01-01

    Last January, we took a look at how ARPA-E performer, 1366 Technologies is working to dramatically reduce the cost of solar energy. A year later, we revisited their headquarters in Lexington, MA to see the progress they've made.

  6. Mentor and Protege of the Year

    Broader source: Energy.gov [DOE]

    The DOE Mentor of the Year award recognizes the efforts of a DOE Mentor that has exceeded the requirements of their Mentor-Protégé agreement. These results have enhanced the protégé’s capabilities...

  7. The European land and inland water CO2, CO, CH4 and N2O balance between 2001 and 2005

    SciTech Connect (OSTI)

    Luyassaert, S; Abril, G; Andres, Robert Joseph; Bastviken, D; Bellassen, V; Bergamaschi, P; Bousquet, P; Chevallier, F; Ciais, P.; Dechow, R; Erb, K-H; Etiope, G; Fortems-Cheiney, A; Grassi, G; Hartmann, J; Jung, M.; Lathiere, J; Lohila, A; Mayorga, E; Moosdorf, N; Njakou, D; Otto, J; Papale, D.; Peters, W; Peylin, P; Raymond, Peter A; Rodenbeck, C; Saarnio, S; Schulze, E.-D.; Szopa, S; Thompson, R; Verkerk, P; Vuichard, N; Wang, R; Wattenbach, M; Zaehle, S

    2012-01-01

    Globally, terrestrial ecosystems have absorbed about 30% of anthropogenic greenhouse gas emissions over the period 2000-2007 and inter-hemispheric gradients indicate that a significant fraction of terrestrial carbon sequestration must be north of the Equator. We present a compilation of the CO{sub 2}, CO, CH{sub 4} and N{sub 2}O balances of Europe following a dual constraint approach in which (1) a land-based balance derived mainly from ecosystem carbon inventories and (2) a land-based balance derived from flux measurements are compared to (3) the atmospheric data-based balance derived from inversions constrained by measurements of atmospheric GHG (greenhouse gas) concentrations. Good agreement between the GHG balances based on fluxes (1294 {+-} 545 Tg C in CO{sub 2}-eq yr{sup -1}), inventories (1299 {+-} 200 Tg C in CO{sub 2}-eq yr{sup -1}) and inversions (1210 {+-} 405 Tg C in CO{sub 2}-eq yr{sup -1}) increases our confidence that the processes underlying the European GHG budget are well understood and reasonably sampled. However, the uncertainty remains large and largely lacks formal estimates. Given that European net land to atmosphere exchanges are determined by a few dominant fluxes, the uncertainty of these key components needs to be formally estimated before efforts could be made to reduce the overall uncertainty. The net land-to-atmosphere flux is a net source for CO{sub 2}, CO, CH{sub 4} and N{sub 2}O, because the anthropogenic emissions by far exceed the biogenic sink strength. The dual-constraint approach confirmed that the European biogenic sink removes as much as 205 {+-} 72 Tg C yr{sup -1} from fossil fuel burning from the atmosphere. However, This C is being sequestered in both terrestrial and inland aquatic ecosystems. If the C-cost for ecosystem management is taken into account, the net uptake of ecosystems is estimated to decrease by 45% but still indicates substantial C-sequestration. However, when the balance is extended from CO{sub 2} towards the main GHGs, C-uptake by terrestrial and aquatic ecosystems is offset by emissions of non-CO{sub 2} GHGs. As such, the European ecosystems are unlikely to contribute to mitigating the effects of climate change.

  8. Uncertainty in Modeling Dust Mass Balance and Radiative Forcing from Size Parameterization

    SciTech Connect (OSTI)

    Zhao, Chun; Chen, Siyu; Leung, Lai-Yung R.; Qian, Yun; Kok, Jasper; Zaveri, Rahul A.; Huang, J.

    2013-11-05

    This study examines the uncertainties in simulating mass balance and radiative forcing of mineral dust due to biases in the aerosol size parameterization. Simulations are conducted quasi-globally (180oW-180oE and 60oS-70oN) using the WRF24 Chem model with three different approaches to represent aerosol size distribution (8-bin, 4-bin, and 3-mode). The biases in the 3-mode or 4-bin approaches against a relatively more accurate 8-bin approach in simulating dust mass balance and radiative forcing are identified. Compared to the 8-bin approach, the 4-bin approach simulates similar but coarser size distributions of dust particles in the atmosphere, while the 3-mode pproach retains more fine dust particles but fewer coarse dust particles due to its prescribed og of each mode. Although the 3-mode approach yields up to 10 days longer dust mass lifetime over the remote oceanic regions than the 8-bin approach, the three size approaches produce similar dust mass lifetime (3.2 days to 3.5 days) on quasi-global average, reflecting that the global dust mass lifetime is mainly determined by the dust mass lifetime near the dust source regions. With the same global dust emission (~6000 Tg yr-1), the 8-bin approach produces a dust mass loading of 39 Tg, while the 4-bin and 3-mode approaches produce 3% (40.2 Tg) and 25% (49.1 Tg) higher dust mass loading, respectively. The difference in dust mass loading between the 8-bin approach and the 4-bin or 3-mode approaches has large spatial variations, with generally smaller relative difference (<10%) near the surface over the dust source regions. The three size approaches also result in significantly different dry and wet deposition fluxes and number concentrations of dust. The difference in dust aerosol optical depth (AOD) (a factor of 3) among the three size approaches is much larger than their difference (25%) in dust mass loading. Compared to the 8-bin approach, the 4-bin approach yields stronger dust absorptivity, while the 3-mode approach yields weaker dust absorptivity. Overall, on quasi-global average, the three size parameterizations result in a significant difference of a factor of 2~3 in dust surface cooling (-1.02~-2.87 W m-2) and atmospheric warming (0.39~0.96 W m-2) and in a tremendous difference of a factor of ~10 in dust TOA cooling (-0.24~-2.20 W m-2). An uncertainty of a factor of 2 is quantified in dust emission estimation due to the different size parameterizations. This study also highlights the uncertainties in modeling dust mass and number loading, deposition fluxes, and radiative forcing resulting from different size parameterizations, and motivates further investigation of the impact of size parameterizations on modeling dust impacts on air quality, climate, and ecosystem.

  9. Jefferson Lab Celebrates 2005: World Year of Physics | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    World Year of Physics Jefferson Lab Celebrates 2005: World Year of Physics January 24, 2005 Newport News, Va. - This year marks the 100th anniversary of Albert Einstein's ...

  10. 1999 Commercial Building Characteristics--Year Constructed Comparison

    U.S. Energy Information Administration (EIA) Indexed Site

    Year Constructed Comparison Percentage of Floorspace and Buildings by Year Constructed, 1999 Percentage of Floorspace and Buildings by Year Constructed, 1999. If having trouble...

  11. NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 An Act to authorize appropriations for fiscal year 2000 for military ...

  12. Webtrends Archives by Fiscal Year - Lose Your Excuse | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Webtrends Archives by Fiscal Year - Information Center Webtrends Archives by Fiscal Year - Calculators Webtrends Archives by Fiscal Year - Multimedia

  13. Fuel Cell Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multi-Year Research, Development and Demonstration Plan Page B - 1 Multi-Year Research, Development and Demonstration Plan Page B - 2 Multi-Year Research, Development and ...

  14. Bioenergy Technologies Office Fiscal Year 2014 Annual Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2014 Annual Report Bioenergy Technologies Office Fiscal Year 2014 Annual Report Bioenergy Technologies Office Fiscal Year 2014 Annual Report PDF icon ...

  15. Estimation of Groundwater Recharge at Pahute Mesa using the Chloride Mass-Balance Method

    SciTech Connect (OSTI)

    Cooper, Clay A; Hershey, Ronald L; Healey, John M; Lyles, Brad F

    2013-07-01

    Groundwater recharge on Pahute Mesa was estimated using the chloride mass-balance (CMB) method. This method relies on the conservative properties of chloride to trace its movement from the atmosphere as dry- and wet-deposition through the soil zone and ultimately to the saturated zone. Typically, the CMB method assumes no mixing of groundwater with different chloride concentrations; however, because groundwater is thought to flow into Pahute Mesa from valleys north of Pahute Mesa, groundwater flow rates (i.e., underflow) and chloride concentrations from Kawich Valley and Gold Flat were carefully considered. Precipitation was measured with bulk and tipping-bucket precipitation gauges installed for this study at six sites on Pahute Mesa. These data, along with historical precipitation amounts from gauges on Pahute Mesa and estimates from the PRISM model, were evaluated to estimate mean annual precipitation. Chloride deposition from the atmosphere was estimated by analyzing quarterly samples of wet- and dry-deposition for chloride in the bulk gauges and evaluating chloride wet-deposition amounts measured at other locations by the National Atmospheric Deposition Program. Mean chloride concentrations in groundwater were estimated using data from the UGTA Geochemistry Database, data from other reports, and data from samples collected from emplacement boreholes for this study. Calculations were conducted assuming both no underflow and underflow from Kawich Valley and Gold Flat. Model results estimate recharge to be 30 mm/yr with a standard deviation of 18 mm/yr on Pahute Mesa, for elevations >1800 m amsl. These estimates assume Pahute Mesa recharge mixes completely with underflow from Kawich Valley and Gold Flat. The model assumes that precipitation, chloride concentration in bulk deposition, underflow and its chloride concentration, have been constant over the length of time of recharge.

  16. Westinghouse Small Modular Reactor balance of plant and supporting systems design

    SciTech Connect (OSTI)

    Memmott, M. J.; Stansbury, C.; Taylor, C.

    2012-07-01

    The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor (iPWR), in which all of the components typically associated with the nuclear steam supply system (NSSS) of a nuclear power plant are incorporated within a single reactor pressure vessel. This paper is the second in a series of four papers which describe the design and functionality of the Westinghouse SMR. It focuses, in particular, upon the supporting systems and the balance of plant (BOP) designs of the Westinghouse SMR. Several Westinghouse SMR systems are classified as safety, and are critical to the safe operation of the Westinghouse SMR. These include the protection and monitoring system (PMS), the passive core cooling system (PXS), and the spent fuel cooling system (SFS) including pools, valves, and piping. The Westinghouse SMR safety related systems include the instrumentation and controls (I and C) as well as redundant and physically separated safety trains with batteries, electrical systems, and switch gears. Several other incorporated systems are non-safety related, but provide functions for plant operations including defense-in-depth functions. These include the chemical volume control system (CVS), heating, ventilation and cooling (HVAC) systems, component cooling water system (CCS), normal residual heat removal system (RNS) and service water system (SWS). The integrated performance of the safety-related and non-safety related systems ensures the safe and efficient operation of the Westinghouse SMR through various conditions and transients. The turbine island consists of the turbine, electric generator, feedwater and steam systems, moisture separation systems, and the condensers. The BOP is designed to minimize assembly time, shipping challenges, and on-site testing requirements for all structures, systems, and components. (authors)

  17. Towards a Sustainable Energy Balance: Progressive Efficiency and the Return of Energy Conservation

    SciTech Connect (OSTI)

    Diamond, Rick; Harris, Jeff; Diamond, Rick; Iyer, Maithili; Payne, Christopher; Blumstein, Carl; Siderius, Hans-Paul

    2007-08-13

    We argue that a primary focus on energy efficiency may not be sufficient to slow (and ultimately reverse) the growth in total energy consumption and carbon emissions. Instead, policy makers need to return to an earlier emphasis on"conservation," with energy efficiency seen as a means rather than an end in itself. We briefly review the concept of"intensive" versus"extensive" variables (i.e., energy efficiency versus energy consumption), and why attention to both consumption and efficiency is essential for effective policy in a carbon- and oil-constrained world with increasingly brittle energy markets. To start, energy indicators and policy evaluation metrics need to reflect energy consumption as well as efficiency. We introduce the concept of"progressive efficiency," with the expected or required level of efficiency varying as a function of house size, appliance capacity, or more generally, the scale of energy services. We propose introducing progressive efficiency criteria first in consumer information programs (including appliance labeling categories) and then in voluntary rating and recognition programs such as ENERGY STAR. As acceptance grows, the concept could be extended to utility rebates, tax incentives, and ultimately to mandatory codes and standards. For these and other programs, incorporating criteria for consumption as well as efficiency offers a path for energy experts, policy-makers, and the public to begin building consensus on energy policies that recognize the limits of resources and global carrying-capacity. Ultimately, it is both necessary and, we believe, possible to manage energy consumption, not just efficiency in order to achieve a sustainable energy balance. Along the way, we may find it possible to shift expectations away from perpetual growth and toward satisfaction with sufficiency.

  18. Performance of the Lead-Alloy Cooled Concept Balanced for Actinide Burning and Electricity Production

    SciTech Connect (OSTI)

    Pavel Hejzlar; Cliff Davis

    2004-09-01

    A lead-bismuth-cooled fast reactor concept targeted for a balanced mission of actinide burning and low-cost electricity production is proposed and its performance analyzed. The design explores the potential benefits of thorium-based fuel in actinide-burning cores, in particular in terms of the reduction of the large reactivity swing and enhancement of the small Doppler coefficient typical of fertile-free actinide burners. Reduced electricity production cost is pursued through a longer cycle length than that used for fertile-free burners and thus a higher capacity factor. It is shown that the concept can achieve a high transuranics destruction rate, which is only 20% lower than that of an accelerator-driven system with fertile-free fuel. The small negative fuel temperature reactivity coefficient, small positive coolant temperature reactivity coefficient, and negative core radial expansion coefficient provide self-regulating characteristics so that the reactor is capable of inherent shutdown during major transients without scram, as in the Integral Fast Reactor. This is confirmed by thermal-hydraulic analysis of several transients without scram, including primary coolant pump trip, station blackout, and reactivity step insertion, which showed that the reactor was able to meet all identified thermal limits. However, the benefits of high actinide consumption and small reactivity swing can be attained only if the uranium from the discharged fuel is separated and not recycled. This additional uranium separation step and thorium reprocessing significantly increase the fuel cycle costs. Because the higher fuel cycle cost has a larger impact on the overall cost of electricity than the savings from the higher capacity factor afforded through use of thorium, this concept appears less promising than the fertile-free actinide burners.

  19. Performance of the Lead-Alloy-Cooled Reactor Concept Balanced for Actinide Burning and Electricity Production

    SciTech Connect (OSTI)

    Hejzlar, Pavel [Massachusetts Institute of Technology (United States); Davis, Cliff B. [Idaho National Engineering and Environmental Laboratory (United States)

    2004-09-15

    A lead-bismuth-cooled fast reactor concept targeted for a balanced mission of actinide burning and low-cost electricity production is proposed and its performance analyzed. The design explores the potential benefits of thorium-based fuel in actinide-burning cores, in particular in terms of the reduction of the large reactivity swing and enhancement of the small Doppler coefficient typical of fertile-free actinide burners. Reduced electricity production cost is pursued through a longer cycle length than that used for fertile-free burners and thus a higher capacity factor. It is shown that the concept can achieve a high transuranics destruction rate, which is only 20% lower than that of an accelerator-driven system with fertile-free fuel. The small negative fuel temperature reactivity coefficient, small positive coolant temperature reactivity coefficient, and negative core radial expansion coefficient provide self-regulating characteristics so that the reactor is capable of inherent shutdown during major transients without scram, as in the Integral Fast Reactor. This is confirmed by thermal-hydraulic analysis of several transients without scram, including primary coolant pump trip, station blackout, and reactivity step insertion, which showed that the reactor was able to meet all identified thermal limits. However, the benefits of high actinide consumption and small reactivity swing can be attained only if the uranium from the discharged fuel is separated and not recycled. This additional uranium separation step and thorium reprocessing significantly increase the fuel cycle costs. Because the higher fuel cycle cost has a larger impact on the overall cost of electricity than the savings from the higher capacity factor afforded through use of thorium, this concept appears less promising than the fertile-free actinide burners.

  20. Building Technologies Program Budget Request: Fiscal Year 2012

    SciTech Connect (OSTI)

    none,

    2011-02-01

    Details about BTP's budget request for FY2012. BTP’s FY 2012 activities reflect a significant shift by EERE in budget development of incorporating analytically based integrated planning, review, and performance assessment of its programs. BTP’s FY 2012 portfolio will achieve rapid gains in the efficient use of buildings energy through a balanced set of strategies.