National Library of Energy BETA

Sample records for year actual peakload

  1. peak_load_2010.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    2. Noncoincident Peak Load, by North American Electric Reliability Corporation Assessment Area, 1990-2010 Actual, 2011-2015 Projected (Megawatts) Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 FRCC 27,266 28,818 30,601 32,823 32,904 34,524 35,444 35,375 38,730 37,493 37,194 39,062 40,696 40,475 42,383 46,396 45,751 46,676 44,836 NPCC 44,116 46,594 43,658 46,706 47,581 47,705 45,094 49,269 49,566 52,855

  2. Hydrogen-or-Fossil-Combustion Nuclear Combined-Cycle Systems for Base- and Peak-Load Electricity Production

    SciTech Connect (OSTI)

    Forsberg, Charles W; Conklin, Jim

    2007-09-01

    A combined-cycle power plant is described that uses (1) heat from a high-temperature nuclear reactor to meet base-load electrical demands and (2) heat from the same high-temperature reactor and burning natural gas, jet fuel, or hydrogen to meet peak-load electrical demands. For base-load electricity production, fresh air is compressed; then flows through a heat exchanger, where it is heated to between 700 and 900 C by heat provided by a high-temperature nuclear reactor via an intermediate heat-transport loop; and finally exits through a high-temperature gas turbine to produce electricity. The hot exhaust from the Brayton-cycle gas turbine is then fed to a heat recovery steam generator that provides steam to a steam turbine for added electrical power production. To meet peak electricity demand, the air is first compressed and then heated with the heat from a high-temperature reactor. Natural gas, jet fuel, or hydrogen is then injected into the hot air in a combustion chamber, combusts, and heats the air to 1300 C-the operating conditions for a standard natural-gas-fired combined-cycle plant. The hot gas then flows through a gas turbine and a heat recovery steam generator before being sent to the exhaust stack. The higher temperatures increase the plant efficiency and power output. If hydrogen is used, it can be produced at night using energy from the nuclear reactor and stored until needed. With hydrogen serving as the auxiliary fuel for peak power production, the electricity output to the electric grid can vary from zero (i.e., when hydrogen is being produced) to the maximum peak power while the nuclear reactor operates at constant load. Because nuclear heat raises air temperatures above the auto-ignition temperatures of the various fuels and powers the air compressor, the power output can be varied rapidly (compared with the capabilities of fossil-fired turbines) to meet spinning reserve requirements and stabilize the electric grid. This combined cycle uses the unique characteristics of high-temperature reactors (T>700 C) to produce electricity for premium electric markets whose demands can not be met by other types of nuclear reactors. It may also make the use of nuclear reactors economically feasible in smaller electrical grids, such as those found in many developing countries. The ability to rapidly vary power output can be used to stabilize electric grid performance-a particularly important need in small electrical grids.

  3. A Fresh Look at Weather Impact on Peak Electricity Demand and Energy Use of Buildings Using 30-Year Actual Weather Data

    SciTech Connect (OSTI)

    Hong, Tianzhen; Chang, Wen-Kuei; Lin, Hung-Wen

    2013-05-01

    Buildings consume more than one third of the world?s total primary energy. Weather plays a unique and significant role as it directly affects the thermal loads and thus energy performance of buildings. The traditional simulated energy performance using Typical Meteorological Year (TMY) weather data represents the building performance for a typical year, but not necessarily the average or typical long-term performance as buildings with different energy systems and designs respond differently to weather changes. Furthermore, the single-year TMY simulations do not provide a range of results that capture yearly variations due to changing weather, which is important for building energy management, and for performing risk assessments of energy efficiency investments. This paper employs large-scale building simulation (a total of 3162 runs) to study the weather impact on peak electricity demand and energy use with the 30-year (1980 to 2009) Actual Meteorological Year (AMY) weather data for three types of office buildings at two design efficiency levels, across all 17 ASHRAE climate zones. The simulated results using the AMY data are compared to those from the TMY3 data to determine and analyze the differences. Besides further demonstration, as done by other studies, that actual weather has a significant impact on both the peak electricity demand and energy use of buildings, the main findings from the current study include: 1) annual weather variation has a greater impact on the peak electricity demand than it does on energy use in buildings; 2) the simulated energy use using the TMY3 weather data is not necessarily representative of the average energy use over a long period, and the TMY3 results can be significantly higher or lower than those from the AMY data; 3) the weather impact is greater for buildings in colder climates than warmer climates; 4) the weather impact on the medium-sized office building was the greatest, followed by the large office and then the small office; and 5) simulated energy savings and peak demand reduction by energy conservation measures using the TMY3 weather data can be significantly underestimated or overestimated. It is crucial to run multi-decade simulations with AMY weather data to fully assess the impact of weather on the long-term performance of buildings, and to evaluate the energy savings potential of energy conservation measures for new and existing buildings from a life cycle perspective.

  4. Use of Residential Smart Appliances for Peak-Load Shifting and Spinning Reserves Cost/Benefit Analysis

    SciTech Connect (OSTI)

    Sastry, Chellury; Pratt, Robert G.; Srivastava, Viraj; Li, Shun

    2010-12-01

    In this report, we present the results of an analytical cost/benefit study of residential smart appliances from a utility/grid perspective in support of a joint stakeholder petition to the ENERGY STAR program within the Environmental Protection Agency (EPA) and Department of Energy (DOE). The goal of the petition is in part to provide appliance manufacturers incentives to hasten the production of smart appliances. The underlying hypothesis is that smart appliances can play a critical role in addressing some of the societal challenges, such as anthropogenic global warming, associated with increased electricity demand, and facilitate increased penetration of renewable sources of power. The appliances we consider include refrigerator/freezers, clothes washers, clothes dryers, room air-conditioners, and dishwashers. The petition requests the recognition that providing an appliance with smart grid capability, i.e., products that meet the definition of a smart appliance, is at least equivalent to a corresponding five percent in operational machine efficiencies. It is then expected that given sufficient incentives and value propositions, and suitable automation capabilities built into smart appliances, residential consumers will be adopting these smart appliances and will be willing participants in addressing the aforementioned societal challenges by more effectively managing their home electricity consumption. The analytical model we utilize in our cost/benefit analysis consists of a set of user-definable assumptions such as the definition of on-peak (hours of day, days of week, months of year), the expected percentage of normal consumer electricity consumption (also referred to as appliance loads) that can shifted from peak hours to off-peak hours, the average power rating of each appliance, etc. Based on these assumptions, we then formulate what the wholesale grid operating-cost savings, or benefits, would be if the smart capabilities of appliances were invoked, and some percentage of appliance loads were shifted away from peak hours to run during off-peak hours, and appliance loads served power-system balancing needs such as spinning reserves that would otherwise have to be provided by generators. The rationale is that appliance loads can be curtailed for about ten minutes or less in response to a grid contingency without any diminution in the quality of service to the consumer. We then estimate the wholesale grid operating-cost savings based on historical wholesale-market clearing prices (location marginal and spinning reserve) from major wholesale power markets in the United States. The savings derived from the smart grid capabilities of an appliance are then compared to the savings derived from a five percent increase in traditional operational machine efficiencies, referred to as cost in this report, to determine whether the savings in grid operating costs (benefits) are at least as high as or higher than the operational machine efficiency credit (cost).

  5. How People Actually Use Thermostats

    SciTech Connect (OSTI)

    Meier, Alan; Aragon, Cecilia; Hurwitz, Becky; Mujumdar, Dhawal; Peffer, Therese; Perry, Daniel; Pritoni, Marco

    2010-08-15

    Residential thermostats have been a key element in controlling heating and cooling systems for over sixty years. However, today's modern programmable thermostats (PTs) are complicated and difficult for users to understand, leading to errors in operation and wasted energy. Four separate tests of usability were conducted in preparation for a larger study. These tests included personal interviews, an on-line survey, photographing actual thermostat settings, and measurements of ability to accomplish four tasks related to effective use of a PT. The interviews revealed that many occupants used the PT as an on-off switch and most demonstrated little knowledge of how to operate it. The on-line survey found that 89% of the respondents rarely or never used the PT to set a weekday or weekend program. The photographic survey (in low income homes) found that only 30% of the PTs were actually programmed. In the usability test, we found that we could quantify the difference in usability of two PTs as measured in time to accomplish tasks. Users accomplished the tasks in consistently shorter times with the touchscreen unit than with buttons. None of these studies are representative of the entire population of users but, together, they illustrate the importance of improving user interfaces in PTs.

  6. Table 14a. Average Electricity Prices, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    a. Average Electricity Prices, Projected vs. Actual" "Projected Price in Constant Dollars" " (constant dollars, cents per kilowatt-hour in ""dollar year"" specific to each AEO)" ...

  7. YEAR

    National Nuclear Security Administration (NNSA)

    YEAR 2014 AVERAGE AGE 48.6 UNDER 30 2 30-39 5 40-49 8 50-59 17 60-69 3 70 AND UP 0 YEAR 2014 AVERAGE LENGTH 16.3 LESS THAN 10 YEARS 11 10-19 YEARS 10 20-29 YEARS 11 30-39 YEARS 3 ...

  8. YEAR

    National Nuclear Security Administration (NNSA)

    69 YEAR 2014 Males 34 Females 35 YEAR 2014 SES 5 EJEK 1 EN 05 8 EN 04 5 NN (Engineering) 27 NQ (ProfTechAdmin) 22 NU (TechAdmin Support) 1 YEAR 2014 American Indian Alaska...

  9. YEAR

    National Nuclear Security Administration (NNSA)

    42 YEAR 2014 Males 36 Females 6 PAY PLAN YEAR 2014 SES 2 EJEK 5 EN 05 7 EN 04 6 EN 03 1 NN (Engineering) 15 NQ (ProfTechAdmin) 6 YEAR 2014 American Indian Alaska Native Male...

  10. YEAR

    National Nuclear Security Administration (NNSA)

    4 YEAR 2012 Males 65 Females 29 YEAR 2012 SES 3 EJEK 5 EN 04 3 NN (Engineering) 21 NQ (ProfTechAdmin) 61 NU (TechAdmin Support) 1 YEAR 2012 American Indian Male 0 American...

  11. YEAR

    National Nuclear Security Administration (NNSA)

    4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJEK 1 EN 03 1 NN (Engineering) 3 NQ (ProfTechAdmin) 31 NU (TechAdmin Support) 5 YEAR 2011 American Indian Male 0 American...

  12. YEAR

    National Nuclear Security Administration (NNSA)

    92 YEAR 2012 Males 52 Females 40 YEAR 2012 SES 1 EJEK 7 EN 04 13 EN 03 1 NN (Engineering) 27 NQ (ProfTechAdmin) 38 NU (TechAdmin Support) 5 YEAR 2012 American Indian Male 0...

  13. YEAR

    National Nuclear Security Administration (NNSA)

    558 YEAR 2013 Males 512 Females 46 YEAR 2013 SES 2 EJEK 2 EN 04 1 NN (Engineering) 11 NQ (ProfTechAdmin) 220 NU (TechAdmin Support) 1 NV (Nuc Mat Courier) 321 YEAR 2013...

  14. YEAR

    National Nuclear Security Administration (NNSA)

    11 YEAR 2012 Males 78 Females 33 YEAR 2012 SES 2 EJEK 9 EN 05 1 EN 04 33 NN (Engineering) 32 NQ (ProfTechAdmin) 31 NU (TechAdmin Support) 3 YEAR 2012 American Indian Male 2...

  15. YEAR

    National Nuclear Security Administration (NNSA)

    300 YEAR 2011 Males 109 Females 191 YEAR 2011 SES 9 EJEK 1 NN (Engineering) 2 NQ (ProfTechAdmin) 203 NU (TechAdmin Support) 38 NF (Future Ldrs) 47 YEAR 2011 American Indian...

  16. YEAR

    National Nuclear Security Administration (NNSA)

    02 YEAR 2011 Males 48 Females 54 YEAR 2011 SES 5 EJEK 1 NN (Engineering) 13 NQ (ProfTechAdmin) 80 NU (TechAdmin Support) 3 YEAR 2011 American Indian Male 0 American Indian...

  17. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2013 Males 27 Females 11 YEAR 2013 SES 1 EN 05 1 EN 04 11 NN (Engineering) 8 NQ (ProfTechAdmin) 15 NU (TechAdmin Support) 2 YEAR 2013 American Indian Alaska Native Male...

  18. YEAR

    National Nuclear Security Administration (NNSA)

    31 YEAR 2013 Males 20 Females 11 YEAR 2013 SES 2 EN 04 4 NN (Engineering) 12 NQ (ProfTechAdmin) 12 NU (TechAdmin Support) 1 YEAR 2013 American Indian Alaska Native Male (AIAN,...

  19. YEAR

    National Nuclear Security Administration (NNSA)

    16 YEAR 2012 Males 84 Females 32 YEAR 2012 SES 26 EJEK 2 EN 05 9 NN (Engineering) 39 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 10 YEAR 2012 American Indian Male 0 American...

  20. YEAR

    National Nuclear Security Administration (NNSA)

    34 YEAR 2012 Males 66 Females 68 YEAR 2012 SES 6 NN (Engineering) 15 NQ (ProfTechAdmin) 110 NU (TechAdmin Support) 3 YEAR 2012 American Indian Male 1 American Indian Female 2...

  1. YEAR

    National Nuclear Security Administration (NNSA)

    86 YEAR 2012 Males 103 Females 183 YEAR 2012 SES 7 EJEK 1 NN (Engineering) 1 NQ (ProfTechAdmin) 202 NU (TechAdmin Support) 30 NF (Future Ldrs) 45 YEAR 2012 American Indian Male...

  2. YEAR

    National Nuclear Security Administration (NNSA)

    80 YEAR 2012 Males 51 Females 29 YEAR 2012 SES 1 EJEK 22 EN 04 21 NN (Engineering) 14 NQ (ProfTechAdmin) 21 NU (TechAdmin Support) 1 YEAR 2012 American Indian Male 0 American...

  3. YEAR

    National Nuclear Security Administration (NNSA)

    1 YEAR 2012 Males 30 Females 11 YEAR 2012 SES 1 EN 05 1 EN 04 11 NN (Engineering) 9 NQ (ProfTechAdmin) 17 NU (TechAdmin Support) 2 YEAR 2012 American Indian Male 0 American...

  4. YEAR

    National Nuclear Security Administration (NNSA)

    96 YEAR 2013 Males 69 Females 27 YEAR 2013 SES 1 EJEK 9 EN 04 27 NN (Engineering) 26 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 3 YEAR 2013 American Indian Alaska Native Male...

  5. YEAR

    National Nuclear Security Administration (NNSA)

    31 YEAR 2012 Males 19 Females 12 YEAR 2012 SES 2 EN 04 4 NN (Engineering) 12 NQ (ProfTechAdmin) 12 NU (TechAdmin Support) 1 YEAR 2012 American Indian Male 0 American Indian...

  6. YEAR

    National Nuclear Security Administration (NNSA)

    0 YEAR 2013 Males 48 Females 32 YEAR 2013 SES 2 EJEK 7 EN 04 11 EN 03 1 NN (Engineering) 23 NQ (ProfTechAdmin) 33 NU (TechAdmin Support) 3 YEAR 2013 American Indian Alaska...

  7. YEAR

    National Nuclear Security Administration (NNSA)

    40 YEAR 2011 Males 68 Females 72 YEAR 2011 SES 5 EJEK 1 NN (Engineering) 16 NQ (ProfTechAdmin) 115 NU (TechAdmin Support) 3 YEAR 2011 American Indian Male 1 American Indian...

  8. YEAR

    National Nuclear Security Administration (NNSA)

    00 YEAR 2012 Males 48 Females 52 YEAR 2012 SES 5 EJEK 1 NN (Engineering) 11 NQ (ProfTechAdmin) 80 NU (TechAdmin Support) 3 YEAR 2012 American Indian Male 0 American Indian...

  9. YEAR

    National Nuclear Security Administration (NNSA)

    137 YEAR 2013 Males 90 Females 47 YEAR 2013 SES 2 SL 1 EJEK 30 EN 04 30 EN 03 2 NN (Engineering) 23 NQ (ProfTechAdmin) 45 NU (TechAdmin Support) 4 YEAR 2013 American Indian...

  10. YEAR

    National Nuclear Security Administration (NNSA)

    of Employees 14 GENDER YEAR 2012 Males 9 Females 5 YEAR 2012 SES 2 EJEK 2 NN (Engineering) 4 NQ (ProfTechAdmin) 6 YEAR 2012 American Indian Male 0 American Indian Female 0...

  11. YEAR

    National Nuclear Security Administration (NNSA)

    3 YEAR 2012 Males 21 Females 22 YEAR 2012 SES 3 EJEK 1 EN 03 1 NN (Engineering) 3 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 5 YEAR 2012 American Indian Male 0 American...

  12. YEAR

    National Nuclear Security Administration (NNSA)

    Males 139 Females 88 YEAR 2012 SES 13 EX 1 EJEK 8 EN 05 23 EN 04 20 EN 03 2 NN (Engineering) 91 NQ (ProfTechAdmin) 62 NU (TechAdmin Support) 7 YEAR 2012 American Indian...

  13. YEAR

    National Nuclear Security Administration (NNSA)

    563 YEAR 2012 Males 518 Females 45 YEAR 2012 SES 1 EJEK 2 EN 04 1 EN 03 1 NN (Engineering) 12 NQ (ProfTechAdmin) 209 NU (TechAdmin Support) 2 NV (Nuc Mat Courier) 335 YEAR 2012...

  14. YEAR

    National Nuclear Security Administration (NNSA)

    7 YEAR 2012 Males 64 Females 33 YEAR 2012 SES 2 EJEK 3 EN 05 1 EN 04 30 EN 03 1 NN (Engineering) 26 NQ (ProfTechAdmin) 32 NU (TechAdmin Support) 2 YEAR 2012 American Indian...

  15. YEAR

    National Nuclear Security Administration (NNSA)

    4 YEAR 2012 Males 37 Females 7 YEAR 2012 SES 1 EJEK 6 EN 05 5 EN 04 7 EN 03 1 NN (Engineering) 17 NQ (ProfTechAdmin) 6 NU (TechAdmin Support) 1 YEAR 2012 American Indian Male 2...

  16. YEAR

    National Nuclear Security Administration (NNSA)

    7 YEAR 2011 Males 38 Females 9 YEAR 2011 SES 1 EJEK 6 EN 05 5 EN 04 7 EN 03 1 NN (Engineering) 19 NQ (ProfTechAdmin) 7 NU (TechAdmin Support) 1 YEAR 2011 American Indian Male 2...

  17. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2013 Males 62 Females 26 YEAR 2013 SES 1 EJEK 3 EN 05 1 EN 04 28 EN 03 1 NN (Engineering) 25 NQ (ProfTechAdmin) 27 NU (TechAdmin Support) 2 YEAR 2013 American Indian...

  18. YEAR

    National Nuclear Security Administration (NNSA)

    6 YEAR 2012 Males 64 Females 32 YEAR 2012 SES 1 EJEK 5 EN 05 3 EN 04 23 EN 03 9 NN (Engineering) 18 NQ (ProfTechAdmin) 33 NU (TechAdmin Support) 4 YEAR 2012 American Indian...

  19. YEAR

    National Nuclear Security Administration (NNSA)

    5 YEAR 2013 Males 58 Females 27 YEAR 2013 SES 1 EJEK 4 EN 05 3 EN 04 21 EN 03 8 NN (Engineering) 16 NQ (ProfTechAdmin) 28 NU (TechAdmin Support) 4 YEAR 2013 American Indian...

  20. YEAR

    National Nuclear Security Administration (NNSA)

    78 YEAR 2012 Males 57 Females 21 YEAR 2012 SES 2 SL 1 EJEK 12 EN 04 21 EN 03 2 NN (Engineering) 12 NQ (ProfTechAdmin) 24 NU (TechAdmin Support) 4 YEAR 2012 American Indian Male...

  1. YEAR

    National Nuclear Security Administration (NNSA)

    2012 Males 149 Females 115 YEAR 2012 SES 17 EX 1 EJEK 7 EN 05 2 EN 04 9 EN 03 2 NN (Engineering) 56 NQ (ProfTechAdmin) 165 NU (TechAdmin Support) 4 GS 13 1 YEAR 2012 American...

  2. YEAR

    National Nuclear Security Administration (NNSA)

    5 YEAR 2014 Males 61 Females 24 PAY PLAN YEAR 2014 SES 1 EJ/EK 8 EN 04 22 NN (Engineering) 23 NQ (Prof/Tech/Admin) 28 NU (Tech/Admin Support) 3 YEAR 2014 American Indian Alaska Native Male (AIAN M) 2 American Indian Alaskan Native Female (AIAN F) 3 African American Male (AA M) 0 African American Female (AA F) 0 Asian American Pacific Islander Male (AAPI M) 3 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 13 Hispanic Female (H F) 10 White Male (W M) 43 White Female (W F) 11

  3. YEAR

    National Nuclear Security Administration (NNSA)

    82 YEAR 2014 Males 57 Females 25 PAY PLAN YEAR 2014 SES 3 EJ/EK 4 EN 04 2 NN (Engineering) 20 NQ (Prof/Tech/Admin) 53 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 9 African American Female (AA F) 9 Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 3 Hispanic Female (H F) 5 White Male (W M) 43 White Female (W F) 10 DIVERSITY TOTAL WORKFORCE

  4. YEAR

    National Nuclear Security Administration (NNSA)

    93 YEAR 2014 Males 50 Females 43 PAY PLAN YEAR 2014 EJ/EK 3 NN (Engineering) 13 NQ (Prof/Tech/Admin) 74 NU (Tech/Admin Support) 3 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 2 African American Male (AA M) 5 African American Female (AA F) 6 Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 6 Hispanic Female (H F) 14 White Male (W M) 39 White Female (W F) 21 DIVERSITY

  5. YEAR

    National Nuclear Security Administration (NNSA)

    YEAR 2014 Males 11 Females 2 PAY PLAN YEAR 2014 SES 2 EJ/EK 1 EN 04 1 NN (Engineering) 5 NQ (Prof/Tech/Admin) 4 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 0 African American Female (AA F) 0 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 10 White Female (W F) 2 DIVERSITY TOTAL WORKFORCE GENDER

  6. YEAR

    National Nuclear Security Administration (NNSA)

    9 YEAR 2014 Males 9 Females 10 YEAR 2014 SES 7 ED 1 EJ/EK 1 EN 05 1 NQ (Prof/Tech/Admin) 8 NU (Tech/Admin Support) 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 1 African American Female (AA F) 5 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 3 White Male (W M) 7 White Female (W F) 1 PAY PLAN DIVERSITY TOTAL

  7. YEAR

    National Nuclear Security Administration (NNSA)

    5 YEAR 2014 Males 92 Females 43 YEAR 2014 SES 8 EX 1 EJ/EK 4 EN 05 9 EN 04 12 EN 03 2 NN (Engineering) 57 NQ (Prof/Tech/Admin) 42 YEAR 2014 American Indian Alaska Native Male (AIAN M) 1 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 9 African American Female (AA F) 11 Asian American Pacific Islander Male (AAPI M) 4 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 12 Hispanic Female (H F) 7 White Male (W M) 66 White Female (W F) 22 PAY PLAN

  8. YEAR

    National Nuclear Security Administration (NNSA)

    563 YEAR 2014 Males 517 Females 46 PAY PLAN YEAR 2014 SES 2 EJ/EK 2 EN 04 1 NN (Engineering) 11 NQ (Prof/Tech/Admin) 218 NU (Tech/Admin Support) 2 NV (Nuc Mat Courier) 327 YEAR 2014 American Indian Alaska Native Male (AIAN M) 14 American Indian Alaskan Native Female (AIAN F) 2 African American Male (AA M) 18 African American Female (AA F) 1 Asian American Pacific Islander Male (AAPI M) 8 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 76 Hispanic Female (H F) 21 White Male

  9. YEAR

    National Nuclear Security Administration (NNSA)

    89 YEAR 2014 Males 98 Females 91 PAY PLAN YEAR 2014 SES 14 EX 1 EJ/EK 3 EN 05 1 EN 04 4 EN 03 1 NN (Engineering) 32 NQ (Prof/Tech/Admin) 130 NU (Tech/Admin Support) 2 GS 15 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 1 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 5 African American Female (AA F) 14 Asian American Pacific Islander Male (AAPI M) 3 Asian American Pacific Islander Female (AAPI F) 7 Hispanic Male (H M) 7 Hispanic Female (H F) 10 White Male

  10. YEAR

    National Nuclear Security Administration (NNSA)

    43 YEAR 2014 Males 162 Females 81 PAY PLAN YEAR 2014 SES 26 EJ/EK 3 EN 05 7 NN (Engineering) 77 NQ (Prof/Tech/Admin) 108 NU (Tech/Admin Support) 22 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 5 African American Female (AA F) 9 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 2 Hispanic Female (H F) 0 White Male (W M) 154 White Female (W F)

  11. YEAR

    National Nuclear Security Administration (NNSA)

    74 YEAR 2014 Males 96 Females 78 PAY PLAN YEAR 2014 SES 8 EJ/EK 4 EN 04 11 EN 03 1 NN (Engineering) 34 NQ (Prof/Tech/Admin) 113 NU (Tech/Admin Support) 3 YEAR 2014 American Indian Alaska Native Male (AIAN M) 2 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 3 African American Female (AA F) 11 Asian American Pacific Islander Male (AAPI M) 5 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 25 Hispanic Female (H F) 25 White Male (W M) 61 White

  12. YEAR

    National Nuclear Security Administration (NNSA)

    4 YEAR 2014 Males 7 Females 7 PAY PLAN YEAR 2014 SES 1 NQ (Prof/Tech/Admin) 7 GS 15 1 GS 14 2 GS 13 2 GS 10 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 3 African American Female (AA F) 2 Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 4 White Female (W F) 5 DIVERSITY TOTAL WORKFORCE GENDER

  13. YEAR

    National Nuclear Security Administration (NNSA)

    16 YEAR 2014 Males 72 Females 144 PAY PLAN YEAR 2014 SES 8 EJ/EK 1 NQ (Prof/Tech/Admin) 198 NU (Tech/Admin Support) 9 YEAR 2014 American Indian Alaska Native Male (AIAN M) 2 American Indian Alaskan Native Female (AIAN F) 2 African American Male (AA M) 10 African American Female (AA F) 38 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 3 Hispanic Male (H M) 15 Hispanic Female (H F) 33 White Male (W M) 44 White Female (W F) 68 DIVERSITY TOTAL

  14. YEAR

    National Nuclear Security Administration (NNSA)

    26 YEAR 2014 Males 81 Females 45 PAY PLAN YEAR 2014 SES 1 SL 1 EJ/EK 25 EN 04 26 EN 03 2 NN (Engineering) 23 NQ (Prof/Tech/Admin) 44 NU (Tech/Admin Support) 4 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 3 African American Female (AA F) 7 Asian American Pacific Islander Male (AAPI M) 4 Asian American Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 68 White

  15. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2014 Males 18 Females 10 PAY PLAN YEAR 2014 SES 1 EN 05 1 EN 04 4 NN (Engineering) 12 NQ (Prof/Tech/Admin) 9 NU (Tech/Admin Support) 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 4 African American Female (AA F) 4 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 13 White Female (W F) 5

  16. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2014 Males 18 Females 20 PAY PLAN YEAR 2014 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 28 NU (Tech/Admin Support) 2 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 0 African American Male (AA M) 1 African American Female (AA F) 1 Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 4 Hispanic Female (H F) 7 White Male (W M) 13 White Female (W F) 11

  17. YEAR

    National Nuclear Security Administration (NNSA)

    25 Females 10 YEAR 2014 SES 1 EN 04 11 NN (Engineering) 8 NQ (Prof/Tech/Admin) 13 NU (Tech/Admin Support) 2 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 1 African American Female (AA F) 3 Asian American Pacific Islander Male (AAPI M) 0 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 24 White Female (W F) 6 TOTAL WORKFORCE GENDER Kansas City

  18. YEAR

    National Nuclear Security Administration (NNSA)

    9 Females 24 PAY PLAN YEAR 2014 SES 1 EJ/EK 4 EN 05 3 EN 04 22 EN 03 8 NN (Engineering) 15 NQ (Prof/Tech/Admin) 27 NU (Tech/Admin Support) 3 YEAR 2014 American Indian Alaska Native Male (AIAN M) 2 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 5 African American Female (AA F) 2 Asian American Pacific Islander Male (AAPI M) 21 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 5 Hispanic Female (H F) 3 White Male (W M) 26 White Female (W F) 16

  19. YEAR

    National Nuclear Security Administration (NNSA)

    17 Females 18 PAY PLAN YEAR 2014 SES 1 EJ/EK 3 NQ (Prof/Tech/Admin) 30 NU (Tech/Admin Support) 1 YEAR 2014 American Indian Alaska Native Male (AIAN M) 1 American Indian Alaskan Native Female (AIAN F) 2 African American Male (AA M) 3 African American Female (AA F) 7 Asian American Pacific Islander Male (AAPI M) 1 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 2 Hispanic Female (H F) 6 White Male (W M) 10 White Female (W F) 3 DIVERSITY TOTAL WORKFORCE GENDER Associate

  20. YEAR

    National Nuclear Security Administration (NNSA)

    8 Females 25 PAY PLAN YEAR 2014 SES 1 EJ/EK 3 EN 05 1 EN 04 25 EN 03 1 NN (Engineering) 25 NQ (Prof/Tech/Admin) 25 NU (Tech/Admin Support) 2 YEAR 2014 American Indian Alaska Native Male (AIAN M) 1 American Indian Alaskan Native Female (AIAN F) 1 African American Male (AA M) 3 African American Female (AA F) 3 Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 46 White Female (W F) 13

  1. YEAR

    National Nuclear Security Administration (NNSA)

    -9.09% YEAR 2012 2013 SES 1 1 0.00% EN 05 1 1 0.00% EN 04 11 11 0.00% NN (Engineering) 8 8 0.00% NQ (ProfTechAdmin) 17 14 -17.65% NU (TechAdmin Support) 2 2...

  2. YEAR

    National Nuclear Security Administration (NNSA)

    Females 863 YEAR 2013 SES 102 EX 3 SL 1 EJEK 89 EN 05 41 EN 04 170 EN 03 18 NN (Engineering) 448 NQ (ProfTechAdmin) 1249 NU (TechAdmin Support) 76 NV (Nuc Mat Courier) 321...

  3. YEAR

    National Nuclear Security Administration (NNSA)

    Females 942 YEAR 2012 SES 108 EX 4 SL 1 EJEK 96 EN 05 45 EN 04 196 EN 03 20 NN (Engineering) 452 NQ (ProfTechAdmin) 1291 NU (TechAdmin Support) 106 NV (Nuc Mat Courier) 335...

  4. YEAR

    National Nuclear Security Administration (NNSA)

    YEAR 2012 2013 SES 2 1 -50.00% EN 05 0 1 100.00% EN 04 4 4 0.00% NN (Engineering) 13 12 -7.69% NQ (ProfTechAdmin) 13 9 -30.77% NU (TechAdmin Support) 1 1...

  5. Year

    U.S. Energy Information Administration (EIA) Indexed Site

    . U.S. Coal Production, 2009 - 2015 (thousand short tons) Year January - March April - June July - September October - December Total 2009 282,772 263,017 269,339 259,796 1,074,923 2010 265,702 264,982 277,505 276,180 1,084,368 2011 273,478 264,291 275,006 282,853 1,095,628 2012 266,865 241,047 258,956 249,591 1,016,458 2013 244,867 243,211 257,595 239,169 984,842 2014 245,271 245,844 255,377 253,557 1,000,049 2015 240,189 211,130 237,263 207,355 895,936 Note: Total may not equal sum of

  6. Could Material Defects Actually Improve Solar Cells?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Could Material Defects Actually Improve Solar Cells? Could Material Defects Actually Improve Solar Cells? March 21, 2016 Contact: Kathy Kincade, kkincade@lbl.gov, +1 510 495 2124 NRELsolarcell Scientists at the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) are using supercomputers to study what may seem paradoxical: certain defects in silicon solar cells may actually improve their performance. The findings, published January 11, 2016 in Applied Physics Letters,

  7. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  8. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  9. Table 13. Coal Production, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Coal Production, Projected vs. Actual" "Projected" " (million short tons)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",999,1021,1041,1051,1056,1066,1073,1081,1087,1098,1107,1122,1121,1128,1143,1173,1201,1223 "AEO 1995",,1006,1010,1011,1016,1017,1021,1027,1033,1040,1051,1066,1076,1083,1090,1108,1122,1137 "AEO

  10. Table 22. Energy Intensity, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Intensity, Projected vs. Actual" "Projected" " (quadrillion Btu / $Billion 2005 Chained GDP)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",10.89145253,10.73335719,10.63428655,10.48440125,10.33479508,10.20669515,10.06546105,9.94541493,9.822393757,9.707148466,9.595465524,9.499032573,9.390723436,9.29474735,9.185496812,9.096176848,9.007677565,8.928276581 "AEO

  11. Caustic-Side Solvent Extraction: Prediction of Cesium Extraction for Actual Wastes and Actual Waste Simulants

    SciTech Connect (OSTI)

    Delmau, L.H.; Haverlock, T.J.; Sloop, F.V., Jr.; Moyer, B.A.

    2003-02-01

    This report presents the work that followed the CSSX model development completed in FY2002. The developed cesium and potassium extraction model was based on extraction data obtained from simple aqueous media. It was tested to ensure the validity of the prediction for the cesium extraction from actual waste. Compositions of the actual tank waste were obtained from the Savannah River Site personnel and were used to prepare defined simulants and to predict cesium distribution ratios using the model. It was therefore possible to compare the cesium distribution ratios obtained from the actual waste, the simulant, and the predicted values. It was determined that the predicted values agree with the measured values for the simulants. Predicted values also agreed, with three exceptions, with measured values for the tank wastes. Discrepancies were attributed in part to the uncertainty in the cation/anion balance in the actual waste composition, but likely more so to the uncertainty in the potassium concentration in the waste, given the demonstrated large competing effect of this metal on cesium extraction. It was demonstrated that the upper limit for the potassium concentration in the feed ought to not exceed 0.05 M in order to maintain suitable cesium distribution ratios.

  12. FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Savers [EERE]

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2012 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum (July 13, 2010)

  13. Table 14a. Average Electricity Prices, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    a. Average Electricity Prices, Projected vs. Actual Projected Price in Constant Dollars (constant dollars, cents per kilowatt-hour in "dollar year" specific to each AEO) AEO $ Year 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 1992 6.80 6.80 6.90 6.90 6.90 6.90 7.00 7.00 7.10 7.10 7.20 7.20 7.20 7.30 7.30 7.40 7.50 7.60 AEO 1995 1993 6.80 6.80 6.70 6.70 6.70 6.70 6.70 6.80 6.80 6.90 6.90 6.90 7.00 7.00 7.10 7.10 7.20

  14. FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Savers [EERE]

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2013 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY_09_DM_RM_AM_Reporting_Memo_and_attachment_072009.pdf Real Property Maintenance Reporting Requirement

  15. "Table 2. Real Gross Domestic Product Growth Trends, Projected vs. Actual"

    U.S. Energy Information Administration (EIA) Indexed Site

    Real Gross Domestic Product Growth Trends, Projected vs. Actual" "Projected Real GDP Growth Trend" " (cumulative average percent growth in projected real GDP from first year shown for each AEO)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO

  16. Table 16. Total Energy Consumption, Projected vs. Actual Projected

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6. Total Energy Consumption, Projected vs. Actual Projected (quadrillion Btu) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 ...

  17. Table 8. Total Natural Gas Consumption, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Actual Projected (trillion cubic feet) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 19.87 20.21 20.64 20.99 ...

  18. Table 14b. Average Electricity Prices, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Average Electricity Prices, Projected vs. Actual" "Projected Price in Nominal Dollars" " (nominal dollars, cents per kilowatt-hour)" ,1993,1994,1995,1996,1997,1998,1999,2000,200...

  19. Table 14b. Average Electricity Prices, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Average Electricity Prices, Projected vs. Actual Projected Price in Nominal Dollars (nominal dollars, cents per kilowatt-hour) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 ...

  20. Table 9. Natural Gas Production, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Natural Gas Production, Projected vs. Actual" "Projected" " (trillion cubic feet)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2...

  1. Table 10. Natural Gas Net Imports, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Natural Gas Net Imports, Projected vs. Actual" "Projected" " (trillion cubic feet)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,...

  2. "Table 7b. Natural Gas Price, Electric Power Sector, Actual...

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Natural Gas Price, Electric Power Sector, Actual vs. Projected" "Projected Price in Nominal Dollars" " (nominal dollars per million Btu)" ,1993,1994,1995,1996,1997,1998,1999,200...

  3. Table 10. Natural Gas Net Imports, Projected vs. Actual Projected

    U.S. Energy Information Administration (EIA) Indexed Site

    Natural Gas Net Imports, Projected vs. Actual Projected (trillion cubic feet) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012...

  4. Table 3a. Imported Refiner Acquisition Cost of Crude Oil, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    a. Imported Refiner Acquisition Cost of Crude Oil, Projected vs. Actual" "Projected Price in Constant Dollars" " (constant dollars per barrel in ""dollar year"" specific to each AEO)" ,"AEO $ Year",1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",1992,16.69,16.42999,16.9899,17.66,18.28,19.0599,19.89,20.72,21.65,22.61,23.51,24.29,24.9,25.6,26.3,27,27.64,28.16

  5. Table 4. Total Petroleum Consumption, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Petroleum Consumption, Projected vs. Actual" "Projected" " (million barrels)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",6449.55,6566.35,6643,6723.3,6810.9,6880.25,6956.9,7059.1,7124.8,7205.1,7296.35,7376.65,7446,7522.65,7595.65,7665,7712.45,7774.5 "AEO

  6. Table 6. Petroleum Net Imports, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Petroleum Net Imports, Projected vs. Actual" "Projected" " (million barrels)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",2934.6,3201.05,3361.65,3504,3657.3,3737.6,3879.95,3993.1,4098.95,4212.1,4303.35,4398.25,4474.9,4540.6,4584.4,4639.15,4668.35,4672 "AEO

  7. FRACTIONAL CRYSTALLIZATION FLOWSHEET TESTS WITH ACTUAL TANK WASTE

    SciTech Connect (OSTI)

    HERTING, D.L.

    2007-04-13

    Laboratory-scale flowsheet tests of the fractional crystallization process were conducted with actual tank waste samples in a hot cell at the 2224 Laboratory. The process is designed to separate medium-curie liquid waste into a low-curie stream for feeding to supplemental treatment and a high-curie stream for double-shell tank storage. Separations criteria (for Cesium-137 sulfate and sodium) were exceeded in all three of the flowsheet tests that were performed.

  8. FRACTIONAL CRYSTALLIZATION FLOWSHEET TESTS WITH ACTUAL TANK WASTE

    SciTech Connect (OSTI)

    HERTING, D.L.

    2006-10-18

    Laboratory-scale flowsheet tests of the fractional crystallization process were conducted with actual tank waste samples in a hot cell at the 222-S Laboratory. The process is designed to separate medium-curie liquid waste into a low-curie stream for feeding to supplemental treatment and a high-curie stream for double-shell tank storage. Separations criteria (for Cs-137 sulfate, and sodium) were exceeded in all three of the flowsheet tests that were performed.

  9. Table 12. Total Coal Consumption, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Coal Consumption, Projected vs. Actual" "Projected" " (million short tons)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",920,928,933,938,943,948,953,958,962,967,978,990,987,992,1006,1035,1061,1079 "AEO 1995",,935,940,941,947,948,951,954,958,963,971,984,992,996,1002,1013,1025,1039 "AEO

  10. Table 12. Total Coal Consumption, Projected vs. Actual Projected

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Coal Consumption, Projected vs. Actual Projected (million short tons) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 920 928 933 938 943 948 953 958 962 967 978 990 987 992 1006 1035 1061 1079 AEO 1995 935 940 941 947 948 951 954 958 963 971 984 992 996 1002 1013 1025 1039 AEO 1996 937 942 954 962 983 990 1004 1017 1027 1033 1046 1067 1070 1071 1074 1082 1087 1094 1103 AEO 1997 948 970 987 1003 1017 1020 1025 1034 1041

  11. Table 13. Coal Production, Projected vs. Actual Projected

    U.S. Energy Information Administration (EIA) Indexed Site

    Coal Production, Projected vs. Actual Projected (million short tons) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 999 1021 1041 1051 1056 1066 1073 1081 1087 1098 1107 1122 1121 1128 1143 1173 1201 1223 AEO 1995 1006 1010 1011 1016 1017 1021 1027 1033 1040 1051 1066 1076 1083 1090 1108 1122 1137 AEO 1996 1037 1044 1041 1045 1061 1070 1086 1100 1112 1121 1135 1156 1161 1167 1173 1184 1190 1203 1215 AEO 1997 1028 1052 1072 1088

  12. Table 15. Total Electricity Sales, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Electricity Sales, Projected vs. Actual" "Projected" " (billion kilowatt-hours)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",2843,2891,2928,2962,3004,3039,3071,3112,3148,3185,3228,3263,3298,3332,3371,3406,3433,3469 "AEO 1995",,2951,2967,2983,3026,3058,3085,3108,3134,3166,3204,3248,3285,3321,3357,3396,3433,3475 "AEO

  13. Table 15. Total Electricity Sales, Projected vs. Actual Projected

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Electricity Sales, Projected vs. Actual Projected (billion kilowatt-hours) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 2843 2891 2928 2962 3004 3039 3071 3112 3148 3185 3228 3263 3298 3332 3371 3406 3433 3469 AEO 1995 2951 2967 2983 3026 3058 3085 3108 3134 3166 3204 3248 3285 3321 3357 3396 3433 3475 AEO 1996 2973 2998 3039 3074 3106 3137 3173 3215 3262 3317 3363 3409 3454 3505 3553 3604 3660 3722 3775 AEO 1997 3075

  14. Table 4. Total Petroleum Consumption, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Petroleum Consumption, Projected vs. Actual Projected (million barrels) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 6450 6566 6643 6723 6811 6880 6957 7059 7125 7205 7296 7377 7446 7523 7596 7665 7712 7775 AEO 1995 6398 6544 6555 6676 6745 6822 6888 6964 7048 7147 7245 7337 7406 7472 7537 7581 7621 AEO 1996 6490 6526 6607 6709 6782 6855 6942 7008 7085 7176 7260 7329 7384 7450 7501 7545 7581 7632 7676 AEO 1997 6636 6694

  15. Table 5. Domestic Crude Oil Production, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Domestic Crude Oil Production, Projected vs. Actual" "Projected" " (million barrels)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",2507.55,2372.5,2255.7,2160.8,2087.8,2022.1,1952.75,1890.7,1850.55,1825,1799.45,1781.2,1766.6,1759.3,1777.55,1788.5,1806.75,1861.5 "AEO

  16. Table 5. Domestic Crude Oil Production, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Domestic Crude Oil Production, Projected vs. Actual Projected (million barrels) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 2508 2373 2256 2161 2088 2022 1953 1891 1851 1825 1799 1781 1767 1759 1778 1789 1807 1862 AEO 1995 2402 2307 2205 2095 2037 1967 1953 1924 1916 1905 1894 1883 1887 1887 1920 1945 1967 AEO 1996 2387 2310 2248 2172 2113 2062 2011 1978 1953 1938 1916 1920 1927 1949 1971 1986 2000 2018 2055 AEO 1997 2362 2307

  17. Table 6. Petroleum Net Imports, Projected vs. Actual Projected

    U.S. Energy Information Administration (EIA) Indexed Site

    Petroleum Net Imports, Projected vs. Actual Projected (million barrels) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 2935 3201 3362 3504 3657 3738 3880 3993 4099 4212 4303 4398 4475 4541 4584 4639 4668 4672 AEO 1995 2953 3157 3281 3489 3610 3741 3818 3920 4000 4103 4208 4303 4362 4420 4442 4460 4460 AEO 1996 3011 3106 3219 3398 3519 3679 3807 3891 3979 4070 4165 4212 4260 4289 4303 4322 4325 4347 4344 AEO 1997 3099 3245 3497

  18. Actual and Estimated Energy Savings Comparison for Deep Energy Retrofits in the Pacific Northwest

    SciTech Connect (OSTI)

    Blanchard, Jeremy; Widder, Sarah H.; Giever, Elisabeth L.; Baechler, Michael C.

    2012-10-01

    Seven homes from the Pacific Northwest were selected to evaluate the differences between estimated and actual energy savings achieved from deep energy retrofits. The energy savings resulting from these retrofits were estimated, using energy modeling software, to save at least 30% on a whole-house basis. The modeled pre-retrofit energy use was trued against monthly utility bills. After the retrofits were completed, each of the homes was extensively monitored, with the exception of one home which was monitored pre-retrofit. This work is being conducted by Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy Building Technologies Program as part of the Building America Program. This work found many discrepancies between actual and estimated energy savings and identified the potential causes for the discrepancies. The differences between actual energy use and modeled energy use also suggest improvements to improve model accuracy. The difference between monthly whole-house actual and estimated energy savings ranged from 75% more energy saved than predicted by the model to 16% less energy saved for all the monitored homes. Similarly, the annual energy savings difference was between 36% and -14%, which was estimated based on existing monitored savings because an entire year of data is not available. Thus, on average, for all six monitored homes the actual energy use is consistently less than estimates, indicating home owners are saving more energy than estimated. The average estimated savings for the eight month monitoring period is 43%, compared to an estimated savings average of 31%. Though this average difference is only 12%, the range of inaccuracies found for specific end-uses is far greater and are the values used to directly estimate energy savings from specific retrofits. Specifically, the monthly post-retrofit energy use differences for specific end-uses (i.e., heating, cooling, hot water, appliances, etc.) ranged from 131% under-predicted to 77% over-predicted by the model with respect to monitored energy use. Many of the discrepancies were associated with occupant behavior which influences energy use, dramatically in some cases, actual versus modeled weather differences, modeling input limitations, and complex homes that are difficult to model. The discrepancy between actual and estimated energy use indicates a need for better modeling tools and assumptions. Despite the best efforts of researchers, the estimated energy savings are too inaccurate to determine reliable paybacks for retrofit projects. While the monitored data allows researchers to understand why these differences exist, it is not cost effective to monitor each home with the level of detail presented here. Therefore an appropriate balance between modeling and monitoring must be determined for more widespread application in retrofit programs and the home performance industry. Recommendations to address these deficiencies include: (1) improved tuning process for pre-retrofit energy use, which currently utilized broad-based monthly utility bills; (2) developing simple occupant-based energy models that better address the many different occupant types and their impact on energy use; (3) incorporating actual weather inputs to increase accuracy of the tuning process, which uses utility bills from specific time period; and (4) developing simple, cost-effective monitoring solutions for improved model tuning.

  19. Actual versus predicted impacts of three ethanol plants on aquatic and terrestrial resources

    SciTech Connect (OSTI)

    Eddlemon, G.K.; Webb, J.W.; Hunsaker, D.B. Jr.; Miller, R.L.

    1993-03-15

    To help reduce US dependence on imported petroleum, Congress passed the Energy Security Act of 1980 (public Law 96-294). This legislation authorized the US Department of Energy (DOE) to promote expansion of the fuel alcohol industry through, among other measures, its Alcohol Fuels Loan Guarantee Program. Under this program, selected proposals for the conversion of plant biomass into fuel-grade ethanol would be granted loan guarantees. of 57 applications submitted for loan guarantees to build and operate ethanol fuel projects under this program, 11 were considered by DOE to have the greatest potential for satisfying DOE`s requirements and goals. In accordance with the National Environmental Policy Act (NEPA), DOE evaluated the potential impacts of proceeding with the Loan Guarantee Program in a programmatic environmental assessment (DOE 1981) that resulted in a finding of no significant impact (FANCY) (47 Federal Register 34, p. 7483). The following year, DOE conducted site-specific environmental assessments (EAs) for 10 of the proposed projects. These F-As predicted no significant environmental impacts from these projects. Eventually, three ethanol fuel projects received loan guarantees and were actually built: the Tennol Energy Company (Tennol; DOE 1982a) facility near Jasper in southeastern Tennessee; the Agrifuels Refining Corporation (Agrifuels; DOE 1985) facility near New Liberia in southern Louisiana; and the New Energy Company of Indiana (NECI; DOE 1982b) facility in South Bend, Indiana. As part of a larger retrospective examination of a wide range of environmental effects of ethanol fuel plants, we compared the actual effects of the three completed plants on aquatic and terrestrial resources with the effects predicted in the NEPA EAs several years earlier. A secondary purpose was to determine: Why were there differences, if any, between actual effects and predictions? How can assessments be improved and impacts reduced?

  20. Table 16. Total Energy Consumption, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Energy Consumption, Projected vs. Actual" "Projected" " (quadrillion Btu)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",88.02,89.53,90.72,91.73,92.71,93.61,94.56,95.73,96.69,97.69,98.89,100,100.79,101.7,102.7,103.6,104.3,105.23 "AEO 1995",,89.21,89.98,90.57,91.91,92.98,93.84,94.61,95.3,96.19,97.18,98.38,99.37,100.3,101.2,102.1,102.9,103.88 "AEO

  1. Table 8. Total Natural Gas Consumption, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Natural Gas Consumption, Projected vs. Actual" "Projected" " (trillion cubic feet)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",19.87,20.21,20.64,20.99,21.2,21.42,21.6,21.99,22.37,22.63,22.95,23.22,23.58,23.82,24.09,24.13,24.02,24.14 "AEO 1995",,20.82,20.66,20.85,21.21,21.65,21.95,22.12,22.25,22.43,22.62,22.87,23.08,23.36,23.61,24.08,24.23,24.59 "AEO

  2. Table 11a. Coal Prices to Electric Generating Plants, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    a. Coal Prices to Electric Generating Plants, Projected vs. Actual" "Projected Price in Constant Dollars" " (constant dollars per million Btu in ""dollar year"" specific to each AEO)" ,"AEO $ Year",1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",1992,1.4699,1.4799,1.53,1.57,1.58,1.57,1.61,1.63,1.68,1.69,1.7,1.72,1.7,1.76,1.79,1.81,1.88,1.92 "AEO

  3. Table 11a. Coal Prices to Electric Generating Plants, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    a. Coal Prices to Electric Generating Plants, Projected vs. Actual Projected Price in Constant Dollars (constant dollars per million Btu in "dollar year" specific to each AEO) AEO $ Year 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 1992 1.47 1.48 1.53 1.57 1.58 1.57 1.61 1.63 1.68 1.69 1.70 1.72 1.70 1.76 1.79 1.81 1.88 1.92 AEO 1995 1993 1.39 1.39 1.38 1.40 1.40 1.39 1.39 1.42 1.41 1.43 1.44 1.45 1.46 1.46 1.46 1.47

  4. Table 3a. Imported Refiner Acquisition Cost of Crude Oil, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    a. Imported Refiner Acquisition Cost of Crude Oil, Projected vs. Actual Projected Price in Constant Dollars (constant dollars per barrel in "dollar year" specific to each AEO) AEO $ Year 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 1992 16.69 16.43 16.99 17.66 18.28 19.06 19.89 20.72 21.65 22.61 23.51 24.29 24.90 25.60 26.30 27.00 27.64 28.16 AEO 1995 1993 14.90 16.41 16.90 17.45 18.00 18.53 19.13 19.65 20.16 20.63

  5. Table 7a. Natural Gas Price, Electric Power Sector, Actual vs. Projected

    U.S. Energy Information Administration (EIA) Indexed Site

    a. Natural Gas Price, Electric Power Sector, Actual vs. Projected Projected Price in Constant Dollars (constant dollars per million Btu in "dollar year" specific to each AEO) AEO $ Year 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 1992 2.44 2.48 2.57 2.66 2.70 2.79 2.84 2.92 3.04 3.16 3.25 3.36 3.51 3.60 3.77 3.91 3.97 4.08 AEO 1995 1993 2.39 2.48 2.42 2.45 2.45 2.53 2.59 2.78 2.91 3.10 3.24 3.38 3.47 3.53 3.61 3.68

  6. "Table 7a. Natural Gas Price, Electric Power Sector, Actual vs. Projected"

    U.S. Energy Information Administration (EIA) Indexed Site

    a. Natural Gas Price, Electric Power Sector, Actual vs. Projected" "Projected Price in Constant Dollars" " (constant dollars per million Btu in ""dollar year"" specific to each AEO)" ,"AEO $ Year",1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",1992,2.44,2.48,2.57,2.66,2.7,2.79,2.84,2.92,3.04,3.16,3.25,3.36,3.51,3.6,3.77,3.91,3.97,4.08 "AEO

  7. Table 17. Total Delivered Residential Energy Consumption, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Delivered Residential Energy Consumption, Projected vs. Actual Projected (quadrillion Btu) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 10.3 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.5 10.5 10.5 10.5 10.5 10.6 10.6 AEO 1995 11.0 10.8 10.8 10.8 10.8 10.8 10.8 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.8 10.8 10.9 AEO 1996 10.4 10.7 10.7 10.7 10.8 10.8 10.9 10.9 11.0 11.2 11.2 11.3 11.4 11.5 11.6 11.7 11.8 12.0 12.1

  8. Table 18. Total Delivered Commercial Energy Consumption, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Delivered Commercial Energy Consumption, Projected vs. Actual Projected (quadrillion Btu) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 6.8 6.9 6.9 7.0 7.1 7.1 7.2 7.2 7.3 7.3 7.4 7.4 7.4 7.5 7.5 7.5 7.5 7.6 AEO 1995 6.9 6.9 7.0 7.0 7.0 7.1 7.1 7.1 7.1 7.1 7.2 7.2 7.2 7.2 7.3 7.3 7.3 AEO 1996 7.1 7.2 7.2 7.3 7.3 7.4 7.4 7.5 7.6 7.6 7.7 7.7 7.8 7.9 8.0 8.0 8.1 8.2 8.2 AEO 1997 7.4 7.4 7.4 7.5 7.5 7.6 7.7 7.7 7.8 7.8 7.9 7.9

  9. Table 19. Total Delivered Industrial Energy Consumption, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Delivered Industrial Energy Consumption, Projected vs. Actual Projected (quadrillion Btu) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 25.4 25.9 26.3 26.7 27.0 27.1 26.8 26.6 26.9 27.2 27.7 28.1 28.3 28.7 29.1 29.4 29.7 30.0 AEO 1995 26.2 26.3 26.5 27.0 27.3 26.9 26.6 26.8 27.1 27.5 27.9 28.2 28.4 28.7 29.0 29.3 29.6 AEO 1996 26.5 26.6 27.3 27.5 26.9 26.5 26.7 26.9 27.2 27.6 27.9 28.2 28.3 28.5 28.7 28.9 29.2 29.4 29.6

  10. Table 20. Total Delivered Transportation Energy Consumption, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Delivered Transportation Energy Consumption, Projected vs. Actual Projected (quadrillion Btu) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 23.6 24.1 24.5 24.7 25.1 25.4 25.7 26.2 26.5 26.9 27.2 27.6 27.9 28.3 28.6 28.9 29.2 29.5 AEO 1995 23.3 24.0 24.2 24.7 25.1 25.5 25.9 26.2 26.5 26.9 27.3 27.7 28.0 28.3 28.5 28.7 28.9 AEO 1996 23.9 24.1 24.5 24.8 25.3 25.7 26.0 26.4 26.7 27.1 27.5 27.8 28.1 28.4 28.6 28.9 29.1 29.3

  11. Table 22. Energy Intensity, Projected vs. Actual Projected

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Intensity, Projected vs. Actual Projected (quadrillion Btu / $Billion 2005 Chained GDP) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 10.9 10.7 10.6 10.5 10.3 10.2 10.1 9.9 9.8 9.7 9.6 9.5 9.4 9.3 9.2 9.1 9.0 8.9 AEO 1995 10.5 10.4 10.3 10.1 10.0 9.8 9.7 9.6 9.4 9.3 9.2 9.1 9.0 8.9 8.9 8.8 8.7 AEO 1996 10.4 10.3 10.1 10.0 9.8 9.7 9.5 9.4 9.3 9.2 9.1 9.0 8.9 8.9 8.8 8.7 8.7 8.6 8.5 AEO 1997 10.0 9.9 9.8 9.7 9.6 9.5 9.4

  12. Table 9. Natural Gas Production, Projected vs. Actual Projected

    U.S. Energy Information Administration (EIA) Indexed Site

    Natural Gas Production, Projected vs. Actual Projected (trillion cubic feet) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 17.71 17.68 17.84 18.12 18.25 18.43 18.58 18.93 19.28 19.51 19.80 19.92 20.13 20.18 20.38 20.35 20.16 20.19 AEO 1995 18.28 17.98 17.92 18.21 18.63 18.92 19.08 19.20 19.36 19.52 19.75 19.94 20.17 20.28 20.60 20.59 20.88 AEO 1996 18.90 19.15 19.52 19.59 19.59 19.65 19.73 19.97 20.36 20.82 21.25 21.37 21.68

  13. ,"Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2006 and Projected 2007 through 2011 " ,"(Thousands of Megawatthours and 2006 Base Year)" ,"Net Energy For Load (Annual)",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"FRCC","MRO (U.S.) ","NPCC (U.S.)

  14. ,"Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2006 and Projected 2008 through 2012 " ,"(Thousands of Megawatthours and 2007 Base Year)",,,,,,,,,,,," " ,"Net Energy For Load (Annual)",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"FRCC","MRO (U.S.)

  15. ,"Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    . Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2009 and Projected 2010 through 2014" ,"(Thousands of Megawatthours and 2009 Base Year)",,,,,,,,,,,," " ,"Net Energy For Load (Annual)",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"FRCC","MRO (U.S.)

  16. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2006 and Projected 2007 through 2011 " ,"(Megawatts and 2006 Base Year)" ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"FRCC","MRO (U.S.) ","NPCC (U.S.)

  17. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2007 and Projected 2008 through 2012 " ,"(Megawatts and 2007 Base Year)" ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid",,,," " ,"Projected Year Base","Year",,"FRCC","MRO (U.S.)

  18. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2006 and Projected 2007 through 2011 " ,"(Megawatts and 2006 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"FRCC"," MRO (U.S.) ","NPCC (U.S.)

  19. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2007 and Projected 2008 through 2012 " ,"(Megawatts and 2007 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"FRCC"," MRO (U.S.) ","NPCC (U.S.)

  20. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2008 and Projected 2009 through 2013 " ,"(Megawatts and 2008 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"FRCC"," MRO (U.S.) ","NPCC (U.S.)

  1. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2009 and Projected 2010 through 2014 " ,"(Megawatts and 2009 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"FRCC"," MRO (U.S.) ","NPCC (U.S.)

  2. ,"Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    Jaunary 2010" ,"Next Update: October 2010" ,"Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2008 and Projected 2009 through 2013 " ,"(Thousands of Megawatthours and 2008 Base Year)",,,,,,,,,,,," " ,"Net Energy For Load (Annual)",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid"

  3. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    8" ,"Released: February 2010" ,"Next Update: October 2010" ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2008 and Projected 2009 through 2013 " ,"(Megawatts and 2008 Base Year)" ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid",,,,"

  4. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    9" ,"Released: December 2010" ,"Next Update: December 2011" ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2009 and Projected 2010 through 2014 " ,"(Megawatts and 2009 Base Year)" ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid",,,,"

  5. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Council Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    5" ,"Released: January 23, 2008" ,"Next Update: October 2007" ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Council Region, " ,"2005 and Projected 2006 through 2010 " ,"(Megawatts and 2005 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected

  6. Table 2. Real Gross Domestic Product Growth Trends, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Real Gross Domestic Product Growth Trends, Projected vs. Actual Projected Real GDP Growth Trend (cumulative average percent growth in projected real GDP from first year shown for each AEO) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 3.09 3.15 2.86 2.78 2.73 2.65 2.62 2.60 2.56 2.53 2.52 2.49 2.45 2.41 2.40 2.36 2.32 2.29 AEO 1995 3.66 2.77 2.53 2.71 2.67 2.61 2.55 2.48 2.46 2.45 2.45 2.43 2.39 2.35 2.31 2.27 2.24 AEO 1996 2.61

  7. ,"Table 3a. January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    January 2010" ,"Next Update: October 2010" ,"Table 3a. January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2008 and Projected 2009 through 2010 " ,"(Megawatts and 2008 Base Year)" ,"Projected Monthly Base","Year","Contiguous U.S.","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid"

  8. ,"Table 3a. January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Council Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    ,"Table 3a. January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Council Region, " ,"1996 through 2003 and Projected 2004 through 2005 " ,"(Megawatts and 2003 Base Year)" ,"Projected Monthly Base","Year","Contiguous U.S.","Eastern Power Grid",,,,,,,,"Texas Power Grid","Western Power Grid"

  9. ,"Table 3a. January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Council Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    3a. January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Council Region, " ,"2005 and Projected 2006 through 2010 " ,"(Megawatts and 2005 Base Year)" ,"Projected Monthly Base","Year","Contiguous U.S.","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid"

  10. Y YEAR

    National Nuclear Security Administration (NNSA)

    2 40 -4.76% YEAR 2013 2014 Males 37 35 -5.41% Females 5 5 0% YEAR 2013 2014 SES 2 2 0% EJEK 5 4 -20.00% EN 05 5 7 40.00% EN 04 6 6 0% EN 03 1 1 0% NN...

  11. Y YEAR

    National Nuclear Security Administration (NNSA)

    79 67 -15.19% YEAR 2013 2014 Males 44 34 -22.73% Females 35 33 -5.71% YEAR 2013 2014 SES 6 4 -33.33% EJEK 1 1 0% EN 05 9 8 -11.11% EN 04 6 5 -16.67% NN...

  12. Y YEAR

    National Nuclear Security Administration (NNSA)

    7 35 -5.41% ↓ YEAR 2013 2014 Males 27 25 -7.41% ↓ Females 10 10 0% / YEAR 2013 2014 SES 1 1 0% / EN 05 1 1 0% / EN 04 11 10 -9.09% ↓ NN (Engineering) 8 8 0% / NQ (Prof/Tech/Admin) 14 15 7.14% ↑ NU (Tech/Admin Support) 2 0 -100% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 1 1 0% / African American Female (AA,F) 3 3 0% / Asian American Pacific Islander Male (AAPI,M) 0 0 0% /

  13. Y YEAR

    National Nuclear Security Administration (NNSA)

    5 79 -7.06% ↓ YEAR 2013 2014 Males 59 57 -3.39% ↓ Females 26 22 -15.38% ↓ YEAR 2013 2014 SES 1 0 -100% ↓ EJ/EK 4 3 -25.00% ↓ EN 05 3 2 -33.33% ↓ EN 04 22 22 0% / EN 03 8 8 0% / NN (Engineering) 16 15 -6.25% ↓ NQ (Prof/Tech/Admin) 28 26 -7.14% ↓ NU (Tech/Admin Support) 3 3 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 2 2 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 5 4 -20.00% ↓ African American Female (AA,F) 3 2

  14. Y YEAR

    National Nuclear Security Administration (NNSA)

    91 81 -10.99% ↓ YEAR 2013 2014 Males 67 56 -16.42% ↓ Females 24 25 4.17% ↑ YEAR 2013 2014 SES 1 2 100% ↑ EJ/EK 9 8 -11.11% ↓ EN 04 25 22 -12.00% ↓ NN (Engineering) 24 20 -16.67% ↓ NQ (Prof/Tech/Admin) 29 26 -10.34% ↓ NU (Tech/Admin Support) 3 3 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 2 2 0% / American Indian Alaskan Native Female (AIAN,F) 3 3 0% / African American Male (AA,M) 0 0 0% / African American Female (AA,F) 0 0 0% / Asian American Pacific Islander

  15. Y YEAR

    National Nuclear Security Administration (NNSA)

    21 -4.55% ↓ YEAR 2013 2014 Males 10 8 -20.00% ↓ Females 12 13 8.33% ↑ YEAR 2013 2014 SES 10 7 -30.00% ↓ EX 0 2 100% ↑ EJ/EK 1 1 0% / EN 05 0 1 100% ↑ EN 04 0 1 100% ↑ NQ (Prof/Tech/Admin) 9 8 -11.11% ↓ NU (Tech/Admin Support) 1 1 0% / ED 00 1 0 -100% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 2 1 -50.00% ↓ African American Male (AA,M) 1 1 0% / African American Female (AA,F) 5 4 -20.00% ↓ Asian

  16. Y YEAR

    National Nuclear Security Administration (NNSA)

    41 155 9.93% ↑ YEAR 2013 2014 Males 92 106 15.22% ↑ Females 49 49 0% / YEAR 2013 2014 SES 8 8 0% / EX 1 1 0% / EJ/EK 4 4 0% / EN 05 11 10 -9.09% ↓ EN 04 11 14 27.27% ↑ EN 03 2 5 150% ↑ NN (Engineering) 60 63 5.00% ↑ NQ (Prof/Tech/Admin) 44 50 13.64% ↑ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 1 1 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 7 10 42.86% ↑ African American Female (AA,F) 13 11 -15.38% ↓ Asian American

  17. Y YEAR

    National Nuclear Security Administration (NNSA)

    563 560 -0.53% ↓ YEAR 2013 2014 Males 518 514 -0.77% ↓ Females 45 46 2.22% ↑ YEAR 2013 2014 SES 2 2 0% / EJ/EK 2 2 0% / EN 04 1 1 0% / NN (Engineering) 11 11 0% / NQ (Prof/Tech/Admin) 218 221 1.38% ↑ NU (Tech/Admin Support) 1 2 100% ↑ NV (Nuc Mat Courier) 328 321 -2.13% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 15 15 0% / American Indian Alaskan Native Female (AIAN,F) 2 2 0% / African American Male (AA,M) 19 18 -5.26% ↓ African American Female (AA,F) 1 1 0% /

  18. Y YEAR

    National Nuclear Security Administration (NNSA)

    97 180 -8.63% ↓ YEAR 2013 2014 Males 105 89 -15.24% ↓ Females 92 91 -1.09% ↓ YEAR 2013 2014 SES 14 13 -7.14% ↓ EX 1 1 0% / EJ/EK 3 3 0% / EN 05 1 1 0% / EN 04 4 2 -50.00% ↓ EN 03 1 1 0% / EN 00 0 3 100% ↑ NN (Engineering) 35 27 -22.86% ↓ NQ (Prof/Tech/Admin) 135 126 -6.67% ↓ NU (Tech/Admin Support) 2 2 0% / GS 15 0 1 100% ↑ GS 13 1 0 -100% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 2 1 -50.00% ↓ American Indian Alaskan Native Female (AIAN,F) 0 0 0% /

  19. Y YEAR

    National Nuclear Security Administration (NNSA)

    *Total number of Employees 122 112 -8.20% ↓ YEAR 2013 2014 Males 90 84 -6.67% ↓ Females 32 28 -12.50% ↓ YEAR 2013 2014 SES 26 24 -7.69% ↓ EJ/EK 3 3 0% / EN 05 8 9 12.50% ↑ NN (Engineering) 48 47 -2.08% ↓ NQ (Prof/Tech/Admin) 30 26 -13.33% ↓ NU (Tech/Admin Support) 7 3 -57.14% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 3 3 0% / African American Female (AA,F) 7 6 -14.29%

  20. Y YEAR

    National Nuclear Security Administration (NNSA)

    4 79 -5.95% ↓ YEAR 2013 2014 Males 59 55 -6.78% ↓ Females 25 24 -4.00% ↓ YEAR 2013 2014 SES 3 3 0% / EJ/EK 4 4 0% / EN 04 2 1 -50.00% ↓ NN (Engineering) 20 20 0% / NQ (Prof/Tech/Admin) 55 51 -7.27% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 0 0 0% / African American Male (AA,M) 10 10 0% / African American Female (AA,F) 9 8 -11.11% ↓ Asian American Pacific Islander Male (AAPI,M) 2 2 0% / Asian American Pacific

  1. Y YEAR

    National Nuclear Security Administration (NNSA)

    8 87 -1.14% ↓ YEAR 2013 2014 Males 46 46 0% / Females 42 41 -2.38% ↓ YEAR 2013 2014 SES 1 0 -100% ↓ EJ/EK 4 2 -50.00% ↓ NN (Engineering) 12 12 0% / NQ (Prof/Tech/Admin) 68 70 2.94% ↑ NU (Tech/Admin Support) 3 3 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 2 2 0% / African American Male (AA,M) 5 5 0% / African American Female (AA,F) 5 6 20.00% ↑ Asian American Pacific Islander Male (AAPI,M) 0 0 0% / Asian

  2. Y YEAR

    National Nuclear Security Administration (NNSA)

    1 14 27.27% ↑ YEAR 2013 2014 Males 9 12 33.33% ↑ Females 2 2 0% / YEAR 2013 2014 SES 2 2 0% / EJ/EK 1 1 0% / EN 04 0 1 100% ↑ EN 00 0 1 100% ↑ NN (Engineering) 5 5 0% / NQ (Prof/Tech/Admin) 3 4 33.33% ↑ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 0 0 0% / African American Male (AA,M) 0 0 0% / African American Female (AA,F) 0 0 0% / Asian American Pacific Islander Male (AAPI,M) 1 1 0% / Asian American Pacific

  3. Y YEAR

    National Nuclear Security Administration (NNSA)

    79 164 -8.38% ↓ YEAR 2013 2014 Males 100 92 -8.00% ↓ Females 79 72 -8.86% ↓ YEAR 2013 2014 SES 8 8 0% / EJ/EK 4 3 -25.00% ↓ EN 04 11 11 0% / EN 03 1 1 0% / EN 00 0 2 100% ↑ NN (Engineering) 39 32 -17.95% ↓ NQ (Prof/Tech/Admin) 111 104 -6.31% ↓ NU (Tech/Admin Support) 5 3 -40.00% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 1 2 100% ↑ American Indian Alaskan Native Female (AIAN,F) 2 1 -50.00% ↓ African American Male (AA,M) 4 3 -25.00% ↓ African American

  4. Y YEAR

    National Nuclear Security Administration (NNSA)

    40 36 -10.00% ↓ YEAR 2013 2014 Males 18 18 0% / Females 22 18 -18.18% ↓ YEAR 2013 2014 SES 3 2 -33.33% ↓ EJ/EK 1 1 0% / EN 03 1 1 0% / NN (Engineering) 3 3 0% / NQ (Prof/Tech/Admin) 30 27 -10.00% ↓ NU (Tech/Admin Support) 2 2 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 0 0 0% / African American Male (AA,M) 1 1 0% / African American Female (AA,F) 1 1 0% / Asian American Pacific Islander Male (AAPI,M) 0 0 0% /

  5. Y YEAR

    National Nuclear Security Administration (NNSA)

    4 30 -11.76% ↓ YEAR 2013 2014 Males 16 14 -12.50% ↓ Females 18 16 -11.11% ↓ YEAR 2013 2014 SES 1 1 0% / EJ/EK 3 1 -66.67% ↓ NQ (Prof/Tech/Admin) 29 27 -6.90% ↓ NU (Tech/Admin Support) 1 1 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 1 1 0% / American Indian Alaskan Native Female (AIAN,F) 2 2 0% / African American Male (AA,M) 3 3 0% / African American Female (AA,F) 7 6 -14.29% ↓ Asian American Pacific Islander Male (AAPI,M) 1 1 0% / Asian American Pacific Islander

  6. Y YEAR

    National Nuclear Security Administration (NNSA)

    9 209 -8.73% ↓ YEAR 2013 2014 Males 76 76 0% / Females 153 133 -13.07% ↓ YEAR 2013 2014 SES 9 6 -33.33% ↓ EJ/EK 1 1 0% / NQ (Prof/Tech/Admin) 208 194 -6.73% ↓ NU (Tech/Admin Support) 11 8 -27.27% ↓ YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 2 2 0% / American Indian Alaskan Native Female (AIAN,F) 3 2 -33.33% ↓ African American Male (AA,M) 10 10 0% / African American Female (AA,F) 39 36 -7.69% ↓ Asian American Pacific Islander Male (AAPI,M) 1 1 0% / Asian American

  7. Y YEAR

    National Nuclear Security Administration (NNSA)

    7 80 -8.05% ↓ YEAR 2013 2014 Males 62 57 -8.06% ↓ Females 25 23 -8.00% ↓ YEAR 2013 2014 SES 1 1 0% / EJ/EK 3 3 0% / EN 05 1 1 0% / EN 04 27 24 -11.11% ↓ EN 03 1 0 -100% ↓ NN (Engineering) 26 25 -3.85% ↓ NQ (Prof/Tech/Admin) 26 24 -7.69% ↓ NU (Tech/Admin Support) 2 2 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 1 1 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 3 2 -33.33% ↓ African American Female (AA,F) 3 3 0% / Asian

  8. Y YEAR

    National Nuclear Security Administration (NNSA)

    8 27 -3.57% ↓ YEAR 2013 2014 Males 18 17 -5.56% ↓ Females 10 10 0% / YEAR 2013 2014 SES 1 1 0% / EN 05 1 1 0% / EN 04 4 3 -25.00% ↓ NN (Engineering) 12 12 0% / NQ (Prof/Tech/Admin) 9 9 0% / NU (Tech/Admin Support) 1 1 0% / YEAR 2013 2014 American Indian Alaska Native Male (AIAN,M) 0 0 0% / American Indian Alaskan Native Female (AIAN,F) 1 1 0% / African American Male (AA,M) 4 4 0% / African American Female (AA,F) 3 4 33.33% ↑ Asian American Pacific Islander Male (AAPI,M) 1 1 0% / Asian

  9. Year Modules

    U.S. Energy Information Administration (EIA) Indexed Site

    Annual photovoltaic module shipments, 2003-2013 (peak kilowatts) Year Modules 2003 80,062 2004 143,274 2005 204,996 2006 320,208 2007 494,148 2008 920,693 2009 1,188,879 2010 2,644,498 2011 3,772,075 2012 4,655,005 2013 4,984,881 Source: U.S. Energy Information Administration, Form EIA-63B, 'Annual Photovoltaic Cell/Module Shipments Report.' Note: Includes both U.S. Shipments and Exports.

  10. Year Modules

    U.S. Energy Information Administration (EIA) Indexed Site

    dollars per peak watt) Year Modules 2003 $3.17 2004 $2.99 2005 $3.19 2006 $3.50 2007 $3.37 2008 $3.49 2009 $2.79 2010 $1.96 2011 $1.59 2012 $1.15 2013 $0.75 Table 4. Average value of photovoltaic modules, 2003-2013 Source: U.S. Energy Information Administration, Form EIA-63B, 'Annual Photovoltaic Cell/Module Shipments Report.' Note: Dollars are not adjusted for inflation.

  11. Table 11b. Coal Prices to Electric Generating Plants, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Coal Prices to Electric Generating Plants, Projected vs. Actual" "Projected Price in Nominal Dollars" " (nominal dollars per million Btu)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO

  12. Table 3b. Imported Refiner Acquisition Cost of Crude Oil, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Imported Refiner Acquisition Cost of Crude Oil, Projected vs. Actual" "Projected Price in Nominal Dollars" " (nominal dollars per barrel)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO

  13. ,"Table 3a. January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    6" ,"Released: February 7, 2008" ,"Next Update: October 2008" ,"Table 3a. January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2006 and Projected 2007 through 2011 " ,"(Megawatts and 2006 Base Year)" ,"Projected Monthly Base","Year","Contiguous U.S.","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid"

  14. ,"Table 3a. January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Corporation Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    7" ,"Released: February 2009" ,"Next Update: October 2009" ,"Table 3a. January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2007 and Projected 2008 through 2009 " ,"(Megawatts and 2007 Base Year)" ,"Projected Monthly Base","Year","Contiguous U.S.","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid"

  15. Making appropriate comparisons of estimated and actual costs of reducing SO{sub 2} emissions under Title IV

    SciTech Connect (OSTI)

    Smith, A.E.

    1998-12-31

    A current sentiment within some parts of the environmental policy community is that market-based regulatory approaches such as emissions trading have proven so effective that actual costs will be only a small fraction of what ex ante cost estimation procedures would project. With this line of reasoning, some have dismissed available cost estimates for major proposed new regulations, such as the new PM and ozone NAAQS, as not meaningful for policy decisions. The most commonly used evidence in support of this position is the experience with SO{sub 2} reductions under Title IV of the 1990 Clean Air Act Amendments. In Title IV, a market for emissions allowances has been used to achieve reductions in sulfur dioxides (SO{sub 2}) to ameliorate acid rain. It is commonly asserted today that the cost of achieving the SO{sub 2} emissions reductions has been only one-tenth or less of what Title IV was originally expected to cost. This paper demonstrates that, to the contrary, actual costs for SO{sub 2} reductions remain roughly in line with original estimates associated with Title IV. Erroneous conclusions about Title IV`s costs are due to inappropriate comparisons of a variety of different measures that appear to be comparable only because they are all stated in dollars per ton. Program cost estimates include the total costs of a fully-implemented regulatory program. The very low costs of Title IV that are commonly cited today are neither directly reflective of a fully implemented Title IV, (which is still many years away) nor reflective of all the costs already incurred. Further, a careful review of history finds that the initial cost estimates that many cite were never associated with Title IV. Technically speaking, people are comparing the estimated control costs for the most-costly power plant associated with earlier acid rain regulatory proposals with prices from a market that do not directly reflect total costs.

  16. Reaction chemistry of nitrogen species in hydrothermal systems: Simple reactions, waste simulants, and actual wastes

    SciTech Connect (OSTI)

    Dell`Orco, P.; Luan, L.; Proesmans, P.; Wilmanns, E.

    1995-02-01

    Results are presented from hydrothermal reaction systems containing organic components, nitrogen components, and an oxidant. Reaction chemistry observed in simple systems and in simple waste simulants is used to develop a model which presents global nitrogen chemistry in these reactive systems. The global reaction path suggested is then compared with results obtained for the treatment of an actual waste stream containing only C-N-0-H species.

  17. "Table 21. Total Energy Related Carbon Dioxide Emissions, Projected vs. Actual"

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Energy Related Carbon Dioxide Emissions, Projected vs. Actual" "Projected" " (million metric tons)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",5060,5129.666667,5184.666667,5239.666667,5287.333333,5335,5379,5437.666667,5481.666667,5529.333333,5599,5657.666667,5694.333333,5738.333333,5797,5874,5925.333333,5984 "AEO

  18. Dose Rate Analysis Capability for Actual Spent Fuel Transportation Cask Contents

    SciTech Connect (OSTI)

    Radulescu, Georgeta; Lefebvre, Robert A; Peplow, Douglas E.; Williams, Mark L; Scaglione, John M

    2014-01-01

    The approved contents for a U.S. Nuclear Regulatory Commission (NRC) licensed spent nuclear fuel casks are typically based on bounding used nuclear fuel (UNF) characteristics. However, the contents of the UNF canisters currently in storage at independent spent fuel storage installations are considerably heterogeneous in terms of fuel assembly burnup, initial enrichment, decay time, cladding integrity, etc. Used Nuclear Fuel Storage, Transportation & Disposal Analysis Resource and Data System (UNF ST&DARDS) is an integrated data and analysis system that facilitates automated cask-specific safety analyses based on actual characteristics of the as-loaded UNF. The UNF-ST&DARDS analysis capabilities have been recently expanded to include dose rate analysis of as-loaded transportation packages. Realistic dose rate values based on actual canister contents may be used in place of bounding dose rate values to support development of repackaging operations procedures, evaluation of radiation-related transportation risks, and communication with stakeholders. This paper describes the UNF-ST&DARDS dose rate analysis methodology based on actual UNF canister contents and presents sample dose rate calculation results.

  19. Treatability studies of actual listed waste sludges from the Oak Ridge Reservation (ORR)

    SciTech Connect (OSTI)

    Jantzen, C.M.; Peeler, D.K.; Gilliam, T.M.; Bleier, A.; Spence, R.D.

    1996-05-06

    Oak Ridge National Laboratory (ORNL) and Savannah River Technology Center (SRTC) are investigating vitrification for various low-level and mixed wastes on the Oak Ridge Reservation (ORR). Treatability studies have included surrogate waste formulations at the laboratory-, pilot-, and field-scales and actual waste testing at the laboratory- and pilot-scales. The initial waste to be processing through SRTC`s Transportable Vitrification System (TVS) is the K-1407-B and K-1407-C (B/C) Pond sludge waste which is a RCRA F-listed waste. The B/C ponds at the ORR K-25 site were used as holding and settling ponds for various waste water treatment streams. Laboratory-, pilot-, and field- scale ``proof-of-principle`` demonstrations are providing needed operating parameters for the planned field-scale demonstration with actual B/C Pond sludge waste at ORR. This report discusses the applied systems approach to optimize glass compositions for this particular waste stream through laboratory-, pilot-, and field-scale studies with surrogate and actual B/C waste. These glass compositions will maximize glass durability and waste loading while optimizing melt properties which affect melter operation, such as melt viscosity and melter refractory corrosion. Maximum waste loadings minimize storage volume of the final waste form translating into considerable cost savings.

  20. TESTING OF THE SPINTEK ROTARY MICROFILTER USING ACTUAL HANFORD WASTE SAMPLES

    SciTech Connect (OSTI)

    HUBER HJ

    2010-04-13

    The SpinTek rotary microfilter was tested on actual Hanford tank waste. The samples were a composite of archived Tank 241-AN-105 material and a sample representing single-shell tanks (SST). Simulants of the two samples have been used in non-rad test runs at the 222-S laboratory and at Savannah River National Laboratory (SRNL). The results of these studies are compared in this report. Two different nominal pore sizes for the sintered steel rotating disk filter were chosen: 0.5 and 0.1 {micro}m. The results suggest that the 0.5-{micro}m disk is preferable for Hanford tank waste for the following reasons: (1) The filtrate clarity is within the same range (<<4 ntu for both disks); (2) The filtrate flux is in general higher for the 0.5-{micro}m disk; and (3) The 0.1-{micro}m disk showed a higher likelihood of fouling. The filtrate flux of the actual tank samples is generally in the range of 20-30% compared to the equivalent non-rad tests. The AN-105 slurries performed at about twice the filtrate flux of the SST slurries. The reason for this difference has not been identified. Particle size distributions in both cases are very similar; comparison of the chemical composition is not conclusive. The sole hint towards what material was stuck in the filter pore holes came from the analysis of the dried flakes from the surface of the fouled 0.1-{micro}m disk. A cleaning approach developed by SRNL personnel to deal with fouled disks has been found adaptable when using actual Hanford samples. The use of 1 M nitric acid improved the filtrate flux by approximately two times; using the same simulants as in the non-rad test runs showed that the filtrate flux was restored to 1/2 of its original amount.

  1. Table 21. Total Energy Related Carbon Dioxide Emissions, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Energy Related Carbon Dioxide Emissions, Projected vs. Actual Projected (million metric tons) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 5060 5130 5185 5240 5287 5335 5379 5438 5482 5529 5599 5658 5694 5738 5797 5874 5925 5984 AEO 1995 5137 5174 5188 5262 5309 5361 5394 5441 5489 5551 5621 5680 5727 5775 5841 5889 5944 AEO 1996 5182 5224 5295 5355 5417 5464 5525 5589 5660 5735 5812 5879 5925 5981 6030 6087 6142 6203

  2. Method and apparatus for distinguishing actual sparse events from sparse event false alarms

    DOE Patents [OSTI]

    Spalding, Richard E. (Albuquerque, NM); Grotbeck, Carter L. (Albuquerque, NM)

    2000-01-01

    Remote sensing method and apparatus wherein sparse optical events are distinguished from false events. "Ghost" images of actual optical phenomena are generated using an optical beam splitter and optics configured to direct split beams to a single sensor or segmented sensor. True optical signals are distinguished from false signals or noise based on whether the ghost image is presence or absent. The invention obviates the need for dual sensor systems to effect a false target detection capability, thus significantly reducing system complexity and cost.

  3. "Table 19. Total Delivered Industrial Energy Consumption, Projected vs. Actual"

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Delivered Industrial Energy Consumption, Projected vs. Actual" "Projected" " (quadrillion Btu)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",25.43,25.904,26.303,26.659,26.974,27.062,26.755,26.598,26.908,27.228,27.668,28.068,28.348,28.668,29.068,29.398,29.688,30.008 "AEO

  4. ACTUAL WASTE TESTING OF GYCOLATE IMPACTS ON THE SRS TANK FARM

    SciTech Connect (OSTI)

    Martino, C.

    2014-05-28

    Glycolic acid is being studied as a replacement for formic acid in the Defense Waste Processing Facility (DWPF) feed preparation process. After implementation, the recycle stream from DWPF back to the high-level waste Tank Farm will contain soluble sodium glycolate. Most of the potential impacts of glycolate in the Tank Farm were addressed via a literature review and simulant testing, but several outstanding issues remained. This report documents the actual-waste tests to determine the impacts of glycolate on storage and evaporation of Savannah River Site high-level waste. The objectives of this study are to address the following: ? Determine the extent to which sludge constituents (Pu, U, Fe, etc.) dissolve (the solubility of sludge constituents) in the glycolate-containing 2H-evaporator feed. ? Determine the impact of glycolate on the sorption of fissile (Pu, U, etc.) components onto sodium aluminosilicate solids. The first objective was accomplished through actual-waste testing using Tank 43H and 38H supernatant and Tank 51H sludge at Tank Farm storage conditions. The second objective was accomplished by contacting actual 2H-evaporator scale with the products from the testing for the first objective. There is no anticipated impact of up to 10 g/L of glycolate in DWPF recycle to the Tank Farm on tank waste component solubilities as investigated in this test. Most components were not influenced by glycolate during solubility tests, including major components such as aluminum, sodium, and most salt anions. There was potentially a slight increase in soluble iron with added glycolate, but the soluble iron concentration remained so low (on the order of 10 mg/L) as to not impact the iron to fissile ratio in sludge. Uranium and plutonium appear to have been supersaturated in 2H-evaporator feed solution mixture used for this testing. As a result, there was a reduction of soluble uranium and plutonium as a function of time. The change in soluble uranium concentration was independent of added glycolate concentration. The change in soluble plutonium content was dependent on the added glycolate concentration, with higher levels of glycolate (5 g/L and 10 g/L) appearing to suppress the plutonium solubility. The inclusion of glycolate did not change the dissolution of or sorption onto actual-waste 2H-evaporator pot scale to an extent that will impact Tank Farm storage and concentration. The effects that were noted involved dissolution of components from evaporator scale and precipitation of components onto evaporator scale that were independent of the level of added glycolate.

  5. PERFORMANCE TESTING OF THE NEXT-GENERATION CSSX SOLVENT WITH ACTUAL SRS TANK WASTE

    SciTech Connect (OSTI)

    Pierce, R.; Peters, T.; Crowder, M.; Fink, S.

    2011-11-01

    Efforts are underway to qualify the Next-Generation Solvent for the Caustic Side Solvent Extraction (CSSX) process. Researchers at multiple national laboratories have been involved in this effort. As part of the effort to qualify the solvent extraction system at the Savannah River Site (SRS), SRNL performed a number of tests at various scales. First, SRNL completed a series of batch equilibrium, or Extraction-Scrub-Strip (ESS), tests. These tests used {approx}30 mL of Next-Generation Solvent and either actual SRS tank waste, or waste simulant solutions. The results from these cesium mass transfer tests were used to predict solvent behavior under a number of conditions. At a larger scale, SRNL assembled 12 stages of 2-cm (diameter) centrifugal contactors. This rack of contactors is structurally similar to one tested in 2001 during the demonstration of the baseline CSSX process. Assembly and mechanical testing found no issues. SRNL performed a nonradiological test using 35 L of cesium-spiked caustic waste simulant and 39 L of actual tank waste. Test results are discussed; particularly those related to the effectiveness of extraction.

  6. Filtration and Leach Testing for REDOX Sludge and S-Saltcake Actual Waste Sample Composites

    SciTech Connect (OSTI)

    Shimskey, Rick W.; Billing, Justin M.; Buck, Edgar C.; Daniel, Richard C.; Draper, Kathryn E.; Edwards, Matthew K.; Geeting, John GH; Hallen, Richard T.; Jenson, Evan D.; Kozelisky, Anne E.; MacFarlan, Paul J.; Peterson, Reid A.; Snow, Lanee A.; Swoboda, Robert G.

    2009-02-20

    A testing program evaluating actual tank waste was developed in response to Task 4 from the M-12 External Flowsheet Review Team (EFRT) issue response plan.( ) The test program was subdivided into logical increments. The bulk water-insoluble solid wastes that are anticipated to be delivered to the Waste Treatment and Immobilization Plant (WTP) were identified according to type such that the actual waste testing could be targeted to the relevant categories. Under test plan TP-RPP-WTP-467, eight broad waste groupings were defined. Samples available from the 222S archive were identified and obtained for testing. Under this test plan, a waste-testing program was implemented that included: • Homogenizing the archive samples by group as defined in the test plan • Characterizing the homogenized sample groups • Performing parametric leaching testing on each group for compounds of interest • Performing bench-top filtration/leaching tests in the hot cell for each group to simulate filtration and leaching activities if they occurred in the UFP2 vessel of the WTP Pretreatment Facility. This report focuses on filtration/leaching tests performed on two of the eight waste composite samples and follow-on parametric tests to support aluminum leaching results from those tests.

  7. Table 3b. Imported Refiner Acquisition Cost of Crude Oil, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Imported Refiner Acquisition Cost of Crude Oil, Projected vs. Actual Projected Price in Nominal Dollars (nominal dollars per barrel) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 17.06 17.21 18.24 19.43 20.64 22.12 23.76 25.52 27.51 29.67 31.86 34.00 36.05 38.36 40.78 43.29 45.88 48.37 AEO 1995 15.24 17.27 18.23 19.26 20.39 21.59 22.97 24.33 25.79 27.27 28.82 30.38 32.14 33.89 35.85 37.97 40.28 AEO 1996 17.16 17.74 18.59

  8. Characterization, Leaching, and Filtrations Testing of Ferrocyanide Tank sludge (Group 8) Actual Waste Composite

    SciTech Connect (OSTI)

    Fiskum, Sandra K.; Billing, Justin M.; Crum, J. V.; Daniel, Richard C.; Edwards, Matthew K.; Shimskey, Rick W.; Peterson, Reid A.; MacFarlan, Paul J.; Buck, Edgar C.; Draper, Kathryn E.; Kozelisky, Anne E.

    2009-02-28

    This is the final report in a series of eight reports defining characterization, leach, and filtration testing of a wide variety of Hanford tank waste sludges. The information generated from this series is intended to supplement the Waste Treatment and Immobilization Plant (WTP) project understanding of actual waste behaviors associated with tank waste sludge processing through the pretreatment portion of the WTP. The work described in this report presents information on a high-iron waste form, specifically the ferrocyanide tank waste sludge. Iron hydroxide has been shown to pose technical challenges during filtration processing; the ferrocyanide tank waste sludge represented a good source of the high-iron matrix to test the filtration processing.

  9. "Table 17. Total Delivered Residential Energy Consumption, Projected vs. Actual"

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Delivered Residential Energy Consumption, Projected vs. Actual" "Projected" " (quadrillion Btu)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",10.31,10.36,10.36,10.37,10.38,10.4,10.4,10.41,10.43,10.43,10.44,10.45,10.46,10.49,10.51,10.53,10.56,10.6 "AEO 1995",,10.96,10.8,10.81,10.81,10.79,10.77,10.75,10.73,10.72,10.7,10.7,10.69,10.7,10.72,10.75,10.8,10.85 "AEO

  10. "Table 18. Total Delivered Commercial Energy Consumption, Projected vs. Actual"

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Delivered Commercial Energy Consumption, Projected vs. Actual" "Projected" " (quadrillion Btu)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",6.82,6.87,6.94,7,7.06,7.13,7.16,7.22,7.27,7.32,7.36,7.38,7.41,7.45,7.47,7.5,7.51,7.55 "AEO 1995",,6.94,6.9,6.95,6.99,7.02,7.05,7.08,7.09,7.11,7.13,7.15,7.17,7.19,7.22,7.26,7.3,7.34 "AEO

  11. "Table 20. Total Delivered Transportation Energy Consumption, Projected vs. Actual"

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Delivered Transportation Energy Consumption, Projected vs. Actual" "Projected" " (quadrillion Btu)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",23.62,24.08,24.45,24.72,25.06,25.38,25.74,26.16,26.49,26.85,27.23,27.55,27.91,28.26,28.61,28.92,29.18,29.5 "AEO 1995",,23.26,24.01,24.18,24.69,25.11,25.5,25.86,26.15,26.5,26.88,27.28,27.66,27.99,28.25,28.51,28.72,28.94 "AEO

  12. An insight into actual energy use and its drivers in high-performance buildings

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Li, Cheng; Hong, Tianzhen; Yan, Da

    2014-07-12

    Using portfolio analysis and individual detailed case studies, we studied the energy performance and drivers of energy use in 51 high-performance office buildings in the U.S., Europe, China, and other parts of Asia. Portfolio analyses revealed that actual site energy use intensity (EUI) of the study buildings varied by a factor of as much as 11, indicating significant variation in real energy use in HPBs worldwide. Nearly half of the buildings did not meet the American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) Standard 90.1-2004 energy target, raising questions about whether a building’s certification as high performing accuratelymore » indicates that a building is energy efficient and suggesting that improvement in the design and operation of HPBs is needed to realize their energy-saving potential. We studied the influence of climate, building size, and building technologies on building energy performance and found that although all are important, none are decisive factors in building energy use. EUIs were widely scattered in all climate zones. There was a trend toward low energy use in small buildings, but the correlation was not absolute; some small HPBs exhibited high energy use, and some large HPBs exhibited low energy use. We were unable to identify a set of efficient technologies that correlated directly to low EUIs. In two case studies, we investigated the influence of occupant behavior as well as operation and maintenance on energy performance and found that both play significant roles in realizing energy savings. We conclude that no single factor determines the actual energy performance of HPBs, and adding multiple efficient technologies does not necessarily improve building energy performance; therefore, an integrated design approach that takes account of climate, technology, occupant behavior, and operations and maintenance practices should be implemented to maximize energy savings in HPBs. As a result, these findings are intended to help architects, engineers, operators, and policy makers improve the design and operation of HPBs.« less

  13. An insight into actual energy use and its drivers in high-performance buildings

    SciTech Connect (OSTI)

    Li, Cheng; Hong, Tianzhen; Yan, Da

    2014-07-12

    Using portfolio analysis and individual detailed case studies, we studied the energy performance and drivers of energy use in 51 high-performance office buildings in the U.S., Europe, China, and other parts of Asia. Portfolio analyses revealed that actual site energy use intensity (EUI) of the study buildings varied by a factor of as much as 11, indicating significant variation in real energy use in HPBs worldwide. Nearly half of the buildings did not meet the American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) Standard 90.1-2004 energy target, raising questions about whether a building’s certification as high performing accurately indicates that a building is energy efficient and suggesting that improvement in the design and operation of HPBs is needed to realize their energy-saving potential. We studied the influence of climate, building size, and building technologies on building energy performance and found that although all are important, none are decisive factors in building energy use. EUIs were widely scattered in all climate zones. There was a trend toward low energy use in small buildings, but the correlation was not absolute; some small HPBs exhibited high energy use, and some large HPBs exhibited low energy use. We were unable to identify a set of efficient technologies that correlated directly to low EUIs. In two case studies, we investigated the influence of occupant behavior as well as operation and maintenance on energy performance and found that both play significant roles in realizing energy savings. We conclude that no single factor determines the actual energy performance of HPBs, and adding multiple efficient technologies does not necessarily improve building energy performance; therefore, an integrated design approach that takes account of climate, technology, occupant behavior, and operations and maintenance practices should be implemented to maximize energy savings in HPBs. As a result, these findings are intended to help architects, engineers, operators, and policy makers improve the design and operation of HPBs.

  14. BENCH-SCALE STEAM REFORMING OF ACTUAL TANK 48H WASTE

    SciTech Connect (OSTI)

    Burket, P; Gene Daniel, G; Charles Nash, C; Carol Jantzen, C; Michael Williams, M

    2008-09-25

    Fluidized Bed Steam Reforming (FBSR) has been demonstrated to be a viable technology to remove >99% of the organics from Tank 48H simulant, to remove >99% of the nitrate/nitrite from Tank 48H simulant, and to form a solid product that is primarily carbonate based. The technology was demonstrated in October of 2006 in the Engineering Scale Test Demonstration Fluidized Bed Steam Reformer1 (ESTD FBSR) at the Hazen Research Inc. (HRI) facility in Golden, CO. The purpose of the Bench-scale Steam Reformer (BSR) testing was to demonstrate that the same reactions occur and the same product is formed when steam reforming actual radioactive Tank 48H waste. The approach used in the current study was to test the BSR with the same Tank 48H simulant and same Erwin coal as was used at the ESTD FBSR under the same operating conditions. This comparison would allow verification that the same chemical reactions occur in both the BSR and ESTD FBSR. Then, actual radioactive Tank 48H material would be steam reformed in the BSR to verify that the actual tank 48H sample reacts the same way chemically as the simulant Tank 48H material. The conclusions from the BSR study and comparison to the ESTD FBSR are the following: (1) A Bench-scale Steam Reforming (BSR) unit was successfully designed and built that: (a) Emulated the chemistry of the ESTD FBSR Denitration Mineralization Reformer (DMR) and Carbon Reduction Reformer (CRR) known collectively as the dual reformer flowsheet. (b) Measured and controlled the off-gas stream. (c) Processed real (radioactive) Tank 48H waste. (d) Met the standards and specifications for radiological testing in the Savannah River National Laboratory (SRNL) Shielded Cells Facility (SCF). (2) Three runs with radioactive Tank 48H material were performed. (3) The Tetraphenylborate (TPB) was destroyed to > 99% for all radioactive Bench-scale tests. (4) The feed nitrate/nitrite was destroyed to >99% for all radioactive BSR tests the same as the ESTD FBSR. (5) The radioactive Tank 48H DMR product was primarily made up of soluble carbonates. The three most abundant species were thermonatrite, [Na{sub 2}CO{sub 3} {center_dot} H{sub 2}O], sodium carbonate, [Na{sub 2}CO{sub 3}], and trona, [Na{sub 3}H(CO{sub 3}){sub 2} {center_dot} 2H{sub 2}O] the same as the ESTD FBSR. (6) Insoluble solids analyzed by X-Ray Diffraction (XRD) did not detect insoluble carbonate species. However, they still may be present at levels below 2 wt%, the sensitivity of the XRD methodology. Insoluble solids XRD characterization indicated that various Fe/Ni/Cr/Mn phases are present. These crystalline phases are associated with the insoluble sludge components of Tank 48H slurry and impurities in the Erwin coal ash. The percent insoluble solids, which mainly consist of un-burnt coal and coal ash, in the products were 4 to 11 wt% for the radioactive runs. (7) The Fe{sup +2}/Fe{sub total} REDOX measurements ranged from 0.58 to 1 for the three radioactive Bench-scale tests. REDOX measurements > 0.5 showed a reducing atmosphere was maintained in the DMR indicating that pyrolysis was occurring. (8) Greater than 90% of the radioactivity was captured in the product for all three runs. (9) The collective results from the FBSR simulant tests and the BSR simulant tests indicate that the same chemistry occurs in the two reactors. (10) The collective results from the BSR simulant runs and the BSR radioactive waste runs indicates that the same chemistry occurs in the simulant as in the real waste. The FBSR technology has been proven to destroy the organics and nitrates in the Tank 48H waste and form the anticipated solid carbonate phases as expected.

  15. HPSS Yearly Network Traffic

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HPSS Yearly Network Traffic HPSS Yearly Network Traffic Yearly Summary of IO Traffic Between Storage and Network Destinations These bar charts show the total transfer traffic for...

  16. Actual Versus Estimated Utility Factor of a Large Set of Privately Owned Chevrolet Volts

    SciTech Connect (OSTI)

    John Smart; Thomas Bradley; Stephen Schey

    2014-04-01

    In order to determine the overall fuel economy of a plug-in hybrid electric vehicle (PHEV), the amount of operation in charge depleting (CD) versus charge sustaining modes must be determined. Mode of operation is predominantly dependent on customer usage of the vehicle and is therefore highly variable. The utility factor (UF) concept was developed to quantify the distance a group of vehicles has traveled or may travel in CD mode. SAE J2841 presents a UF calculation method based on data collected from travel surveys of conventional vehicles. UF estimates have been used in a variety of areas, including the calculation of window sticker fuel economy, policy decisions, and vehicle design determination. The EV Project, a plug-in electric vehicle charging infrastructure demonstration being conducted across the United States, provides the opportunity to determine the real-world UF of a large group of privately owned Chevrolet Volt extended range electric vehicles. Using data collected from Volts enrolled in The EV Project, this paper compares the real-world UF of two groups of Chevrolet Volts to estimated UF's based on J2841. The actual observed fleet utility factors (FUF) for the MY2011/2012 and MY2013 Volt groups studied were observed to be 72% and 74%, respectively. Using the EPA CD ranges, the method prescribed by J2841 estimates a FUF of 65% and 68% for the MY2011/2012 and MY2013 Volt groups, respectively. Volt drivers achieved higher percentages of distance traveled in EV mode for two reasons. First, they had fewer long-distance travel days than drivers in the national travel survey referenced by J2841. Second, they charged more frequently than the J2841 assumption of once per day - drivers of Volts in this study averaged over 1.4 charging events per day. Although actual CD range varied widely as driving conditions varied, the average CD ranges for the two Volt groups studied matched the EPA CD range estimates, so CD range variation did not affect FUF results.

  17. Table 11b. Coal Prices to Electric Generating Plants, Projected vs. Actual

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Coal Prices to Electric Generating Plants, Projected vs. Actual Projected Price in Nominal Dollars (nominal dollars per million Btu) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 1.50 1.55 1.64 1.73 1.78 1.82 1.92 2.01 2.13 2.22 2.30 2.41 2.46 2.64 2.78 2.90 3.12 3.30 AEO 1995 1.42 1.46 1.49 1.55 1.59 1.62 1.67 1.76 1.80 1.89 1.97 2.05 2.13 2.21 2.28 2.38 2.50 AEO 1996 1.35 1.35 1.37 1.39 1.42 1.46 1.50 1.56 1.62 1.67 1.75

  18. Table 7b. Natural Gas Price, Electric Power Sector, Actual vs. Projected

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Natural Gas Price, Electric Power Sector, Actual vs. Projected Projected Price in Nominal Dollars (nominal dollars per million Btu) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 2.49 2.60 2.76 2.93 3.05 3.24 3.39 3.60 3.86 4.15 4.40 4.70 5.08 5.39 5.85 6.27 6.59 7.01 AEO 1995 2.44 2.61 2.61 2.70 2.78 2.95 3.11 3.44 3.72 4.10 4.43 4.78 5.07 5.33 5.64 5.95 6.23 AEO 1996 2.08 2.19 2.20 2.39 2.47 2.54 2.64 2.74 2.84 2.95 3.09

  19. FRACTIONAL CRYSTALLIZATION LABORATORY TESTING FOR INCLUSION & COPRECIPITATION WITH ACTUAL TANK WASTE

    SciTech Connect (OSTI)

    WARRANT, R.W.

    2006-12-11

    Fractional crystallization is being considered as a pretreatment method to support supplemental treatment of retrieved single-shell tank (SST) saltcake waste at the Hanford Site. The goal of the fractional crystallization process is to optimize the separation of the radioactivity (radionuclides) from the saltcake waste and send it to the Waste Treatment and Immobilization Plant and send the bulk of the saltcake to the supplemental treatment plant (bulk vitrification). The primary factors that influence the separation efficiency are (1) solid/liquid separation efficiency, (2) contaminant inclusions, and (3) co-precipitation. This is a report of testing for factors (2) and (3) with actual tank waste samples. For the purposes of this report, contaminant inclusions are defined as the inclusion of supernatant, containing contaminating radionuclides, in a pocket within the precipitating saltcake crystals. Co-precipitation is defined as the simultaneous precipitation of a saltcake crystal with a contaminating radionuclide. These two factors were tested for various potential fractional crystallization product salts by spiking the composite tank waste samples (SST Early or SST Late, external letter CH2M-0600248, ''Preparation of Composite Tank Waste Samples for ME-21 Project'') with the desired target salt and then evaporating to precipitate that salt. SST Early represents the typical composition of dissolved saltcake early in the retrieval process, and SST Late represents the typical composition during the later stages of retrieval.

  20. Relationship between self-reported activity levels and actual heart rates in teenagers

    SciTech Connect (OSTI)

    Terblanche, A.P.S.; Ozkaynak, H.; Spengler, J.D.; Butler, D.A. )

    1991-08-01

    A study was designed to explore the relationship between self-reported activity levels and actual heart rate (HR) as measured by a portable heart rate monitor. Twenty-two teenagers (8 boys, 14 girls, median age of 16) from Watertown High School, Massachusetts participated in this pilot study which involved continuous monitoring of HR during normal daily activities and simultaneous completion of a time-activity diary. There were 31 successful monitoring sessions ranging from 1.9 to 17 hours with a median monitoring time of 12.6 hours. Four unsuccessful monitoring sessions were experienced due to equipment failure. Apart from participant cooperation, the single most important factor affecting the feasibility of continuous heart rate monitoring was found to be equipment design. Th overall average heart rate observed was 88.4 bpm (SD = 24.3). An individual's correlation coefficient for perceived activity level (documented in half-hour intervals) and heart rate (averaged over the half-hour intervals) varied from 0.24 to 0.89. More than half of the correlation coefficients were below 0.40. There was a significant difference between average heart rate for time spent indoors (90 bpm) versus outdoors (103 bpm) even after correcting for sleeping time. It is concluded that continuous HR monitoring with simultaneous completion of a time/activity dairy is feasible and is a promising source of information for studies on exposure to air pollutants.

  1. Predicted Versus Actual Savings for a Low-Rise Multifamily Retrofit in Boulder, Colorado

    SciTech Connect (OSTI)

    Arena, L.; Williamson, J.

    2013-11-01

    To determine the most cost-effective methods of improving buildings, accurate analysis and prediction of the energy use of existing buildings is essential. However, multiple studies confirm that analysis methods tend to over-predict energy use in poorly insulated, leaky homes and thus, the savings associated with improving those homes. In this project, the Building America CARB team evaluated the retrofit of a multifamily building in Boulder, CO. The updated property is a 37 unit, 2 story apartment complex built in 1950, which underwent renovations in early 2009 to bring it into compliance with Boulder, CO's SmartRegs ordinance. Goals of the study were to: 1) evaluate predicted versus actual savings due to the improvements, 2) identify areas where the modeling assumptions may need to be changed, and 3) determine common changes made by renters that would negatively impact energy savings. Other issues that were investigated include the effects of improving building efficiency on tenant comfort, the impact on tenant turnover rates, and the potential market barriers for this type of community scale project.

  2. Predicted Versus Actual Savings for a Low-Rise Multifamily Retrofit in Boulder, Colorado

    SciTech Connect (OSTI)

    Arena, L.; Williamson, J.

    2013-11-01

    To determine the most cost-effective methods of improving buildings, accurate analysis and prediction of the energy use of existing buildings is essential. However, multiple studies confirm that analysis methods tend to over-predict energy use in poorly insulated, leaky homes and thus, the savings associated with improving those homes. In NREL's report titled 'Assessing and Improving the Accuracy of Energy Analysis of Residential Buildings,' researchers propose a method for improving the accuracy of residential energy analysis methods. A key step in this process involves the comparisons of predicted versus metered energy use and savings. In support of this research need, CARB evaluated the retrofit of a multifamily building in Boulder, CO. The updated property is a 37 unit, 2 story apartment complex built in 1950, which underwent renovations in early 2009 to bring it into compliance with Boulder, CO's SmartRegs ordinance. Goals of the study were to: 1) evaluate predicted versus actual savings due to the improvements, 2) identify areas where the modeling assumptions may need to be changed, and 3) determine common changes made by renters that would negatively impact energy savings. In this study, CARB seeks to improve the accuracy of modeling software while assessing retrofit measures to specifically determine which are most effective for large multifamily complexes in the cold climate region. Other issues that were investigated include the effects of improving building efficiency on tenant comfort, the impact on tenant turnover rates, and the potential market barriers for this type of community scale project.

  3. HPSS Yearly Network Traffic

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HPSS Yearly Network Traffic HPSS Yearly Network Traffic Yearly Summary of I/O Traffic Between Storage and Network Destinations These bar charts show the total transfer traffic for each year between storage and network destinations (systems within and outside of NERSC). Traffic for the current year is an estimate derived by scaling the known months traffic up to 12 months. The years shown are calendar years. The first graph shows the overall growth in network traffic to storage over the years.

  4. ACTUAL-WASTE TESTING OF ULTRAVIOLET LIGHT TO AUGMENT THE ENHANCED CHEMICAL CLEANING OF SRS SLUDGE

    SciTech Connect (OSTI)

    Martino, C.; King, W.; Ketusky, E.

    2012-07-10

    In support of Savannah River Site (SRS) tank closure efforts, the Savannah River National Laboratory (SRNL) conducted Real Waste Testing (RWT) to evaluate Enhanced Chemical Cleaning (ECC), an alternative to the baseline 8 wt% oxalic acid (OA) chemical cleaning technology for tank sludge heel removal. ECC utilizes a more dilute OA solution (2 wt%) and an oxalate destruction technology using ozonolysis with or without the application of ultraviolet (UV) light. SRNL conducted tests of the ECC process using actual SRS waste material from Tanks 5F and 12H. The previous phase of testing involved testing of all phases of the ECC process (sludge dissolution, OA decomposition, product evaporation, and deposition tank storage) but did not involve the use of UV light in OA decomposition. The new phase of testing documented in this report focused on the use of UV light to assist OA decomposition, but involved only the OA decomposition and deposition tank portions of the process. Compared with the previous testing at analogous conditions without UV light, OA decomposition with the use of UV light generally reduced time required to reach the target of <100 mg/L oxalate. This effect was the most pronounced during the initial part of the decomposition batches, when pH was <4. For the later stages of each OA decomposition batch, the increase in OA decomposition rate with use of the UV light appeared to be minimal. Testing of the deposition tank storage of the ECC product resulted in analogous soluble concentrations regardless of the use or non-use of UV light in the ECC reactor.

  5. STEAM REFORMING TECHNOLOGY DEMONSTRATION FOR THE DESTRUCTION OF ORGANICS ON ACTUAL DOE SAVANNAH RIVER SITE TANK 48H WASTE 9138

    SciTech Connect (OSTI)

    Burket, P

    2009-02-24

    This paper describes the design of the Bench-scale Steam Reformer (BSR); a processing unit for demonstrating steam reforming technology on actual radioactive waste [1]. It describes the operating conditions of the unit used for processing a sample of Savannah River Site (SRS) Tank 48H waste. Finally, it compares the results from processing the actual waste in the BSR to processing simulant waste in the BSR to processing simulant waste in a large pilot scale unit, the Fluidized Bed Steam Reformer (FBSR), operated at Hazen Research Inc. in Golden, CO. The purpose of this work was to prove that the actual waste reacted in the same manner as the simulant waste in order to validate the work performed in the pilot scale unit which could only use simulant waste.

  6. Final Report. LAW Glass Formulation to Support AP-101 Actual Waste Testing, VSL-03R3470-2, Rev. 0

    SciTech Connect (OSTI)

    Muller, I. S.; Pegg, I. L.; Rielley, Elizabeth; Carranza, Isidro; Hight, Kenneth; Lai, Shan-Tao T.; Mooers, Cavin; Bazemore, Gina; Cecil, Richard; Kruger, Albert A.

    2015-06-22

    The main objective of the work was to develop and select a glass formulation for vitrification testing of the actual waste sample of LAW AP-101 at Battelle - Pacific Northwest Division (PNWD). Other objectives of the work included preparation and characterization of glasses to demonstrate compliance with contract and processing requirements, evaluation of the ability to achieve waste loading requirements, testing to demonstrate compatibility of the glass melts with melter materials of construction, comparison of the properties of simulant and actual waste glasses, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  7. Next Update: December 2011 Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region,

    U.S. Energy Information Administration (EIA) Indexed Site

    Released: December 2010 Next Update: December 2011 Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, 2009 and Projected 2010 through 2014 (Megawatts and 2009 Base Year) 2009 725,958 46,550 37,963 55,944 161,241 191,032 41,465 63,518 128,245 Contiguou s U.S. FRCC MRO (U.S.) NPCC (U.S.) RFC SERC SPP TRE WECC (U.S.) 772,089 46,006 42,240 60,215 177,688 201,350 43,395 63,810 137,385 785,069 46,124 42,733 60,820 181,867 205,351

  8. Next Update: December 2011 Table 2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region,

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, 2009 and Projected 2010 through 2014 (Megawatts and 2009 Base Year) 2009/2010 668,818 53,022 35,351 44,864 143,827 193,135 32,863 56,191 109,565 Contiguous U.S. FRCC MRO (U.S.) NPCC (U.S.) RFC SERC SPP TRE WECC (U.S.) 639,073 46,235 35,722 46,374 143,040 183,614 31,415 43,823 108,850 646,845 46,821 36,816 46,529 146,591 186,364 33,047 43,823 106,854 657,839 47,558 37,359 46,753

  9. 50 Years of Space

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    50 Years of Space science-innovationassetsimagesicon-science.jpg 50 Years of Space Since 1943, some of the world's smartest and most dedicated technical people have ...

  10. 70 Years of Innovations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    70 Years of Innovations aboutassetsimagesicon-70th2.jpg Innovations: Celebrating 70 Years Since 1943, some of the world's smartest and most dedicated technical people have ...

  11. 70 years after Trinity

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    70 years after Trinity 70 years after Trinity Though the world has seen many changes since Trinity, one thing has remained constant: Los Alamos remains essential to our nation's ...

  12. Secretary Moniz's First Year

    Broader source: Energy.gov [DOE]

    We're looking back at some of the biggest moments from Energy Secretary Ernest Moniz's first year in office.

  13. Ion exchange removal of cesium from simulated and actual supernate from Hanford tanks 241-SY-101 and 241-SY-103

    SciTech Connect (OSTI)

    Brown, G.N.; Bontha, J.R.; Carlson, C.D.

    1995-09-01

    Pacific Northwest Laboratory (PNL), in conjunction with the Process Chemistry and Statistics Section of Westinghouse Hanford Company (WHC), conducted this study as part of the Supernatant Treatment Development Task for the Initial Pretreatment Module (IPM) Applied Engineering Project. The study assesses the performance of the CS-100 ion exchange material for removing cesium from simulated and actual alkaline supernate from Hanford tanks 241-SY-101 and 241-SY-103. The objective of these experiments is to compare the cesium ion exchange loading and elution profiles of actual and simulated wastes. Specific experimental objectives include (1) demonstration of decontamination factors (DF) for cesium removal, 92) verification of simulant performance, (3) investigation of waste/exchanger chemistry, and (4) determination of the radionuclide content of the regenerated CS-100 resin prior to disposal.

  14. 2013 Year in Review

    Energy Savers [EERE]

    3 Year in Review i 2013 YIR May 2014 Year-in-Review: 2013 Energy Infrastructure Events and Expansions Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S. Department of Energy DOE / 2013 Year in Review ii 2013 YIR For Further Information This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and William Bryan, Deputy Assistant Secretary. Specific

  15. Final Year Project Report

    SciTech Connect (OSTI)

    Hubsch, Tristan

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  16. Allocation Year Rollover process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Allocatio Year Rollover process Allocation Year Rollover process December 23, 2013 by Francesca Verdier Allocation Year 2013 (AY13) ends at 23:59:59 on Monday, January 13, 2014. AY14 runs from Tuesday, January 14, 2014 through Monday, January 12, 2015. The major features of the rollover are: charging acroess the AY boundary: All batch jobs will continue running during the rollover. Time accrued before midnight will be charged to AY13 repos; time accrued after midnight will be charged to AY14

  17. Applied Science and Technology Task Order Fiscal Year 2009 Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End ...

  18. Applied Science and Technology Task Order Fiscal Year 2008 Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End ...

  19. Applied Science and Technology Task Order Fiscal Year 2011 Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End ...

  20. Applied Science and Technology Task Order Fiscal Year 2010 Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End ...

  1. Technique of estimation of actual strength of a gas pipeline section at its deformation in landslide action zone

    SciTech Connect (OSTI)

    Tcherni, V.P.

    1996-12-31

    The technique is given which permits determination of stress and strain state (SSS) and estimation of actual strength of a section of a buried main gas pipeline (GP) in the case of its deformation in a landslide action zone. The technique is based on the use of three-dimensional coordinates of axial points of the deformed GP section. These coordinates are received by a full-scale survey. The deformed axis of the surveyed GP section is described by the polynomial. The unknown coefficients of the polynomial can be determined from the boundary conditions at points of connection with contiguous undeformed sections as well as by use of minimization methods in mathematical processing of full-scale survey results. The resulting form of GP section`s axis allows one to determine curvatures and, accordingly, bending moments along all the length of the considered section. The influence of soil resistance to longitudinal displacements of a pipeline is used to determine longitudinal forces. Resulting values of bending moments and axial forces as well as the known value of internal pressure are used to analyze all necessary components of an actual SSS of pipeline section and to estimate its strength by elastic analysis.

  2. Ten Year Site Plans

    Broader source: Energy.gov [DOE]

    A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the Department of Energy’s overall strategic plan. It is a...

  3. Welcome Year in Review

    National Nuclear Security Administration (NNSA)

    Training Meeting Orlando, Florida-May 23-25, 2006 Sponsored by the U.S. Department of Energy & the U.S. Nuclear Regulatory Commission Welcome & Year In Review Peter Dessaules...

  4. Next Update: December 2011 Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region,

    U.S. Energy Information Administration (EIA) Indexed Site

    . Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region, 2009 and Projected 2010 through 2014 2009 3,832,180 225,966 213,797 285,625 880,377 997,142 202,301 308,278 718,694 Contiguous U.S. FRCC MRO (U.S.) NPCC (U.S.) RFC SERC SPP TRE WECC (U.S.) 3,969,750 223,174 225,167 291,540 961,436 1,027,470 211,438 310,444 719,081 4,084,175 225,498 229,258 292,816 1,024,183 1,051,645 215,333 316,194 729,248 4,203,875 229,393 240,817 295,623 1,081,320 1,072,124

  5. Next Update: October 2009 Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region,

    U.S. Energy Information Administration (EIA) Indexed Site

    1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region, 2006 and Projected 2008 through 2012 2007 4,012,728 232,405 217,602 301,766 954,700 1,049,298 210,875 307,064 739,018 Contiguous U.S. FRCC MRO (U.S.) NPCC (U.S.) RFC SERC SPP TRE (ERCOT) WECC (U.S.) 4,085,683 242,923 225,058 301,767 973,800 1,073,081 208,532 313,946 746,575 4,149,201 248,996 230,745 305,223 984,000 1,086,304 212,884 319,355 761,694 4,226,516 255,216 239,483 308,534 999,200

  6. Next Update: October 2010 Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region,

    U.S. Energy Information Administration (EIA) Indexed Site

    Jaunary 2010 Next Update: October 2010 Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region, 2008 and Projected 2009 through 2013 2008 3,989,058 226,874 227,536 297,362 936,201 1,035,390 207,603 312,401 745,691 Contiguous U.S. FRCC MRO (U.S.) NPCC (U.S.) RFC SERC SPP TRE WECC (U.S.) 4,025,705 227,690 233,519 295,883 958,792 1,051,350 207,850 312,205 738,416 4,076,698 228,579 239,702 295,753 967,962 1,067,893 211,343 315,065 750,401

  7. Through the years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    years Early 1960s Researchers at PNL (now called PNNL) developed the standards and devices for setting and measuring radiation doses received by nuclear industry work- ers. Tens of thousands of people, including children, have been mea- sured by whole-body counters since the 1960s to relate their physical content of radioactive materials to sources such as food and water. 1960s PNL formulated the first use of a digital computer for complete process control of a mass spectrometer. Mid-1960s PNL

  8. ,"Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Council Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    3 and Projected 2004 through 2008 " ,"(Thousands of Megawatthours and 2003 Base Year)" ,"Net Energy For Load (Annual)",,"Contiguous U.S. ","Eastern Power Grid",,,,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"ECAR","FRCC","MAAC","MAIN","MAPP (U.S.) ","NPCC (U.S.)

  9. ,"Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Council Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    4 and Projected 2005 through 2009 " ,"(Thousands of Megawatthours and 2004 Base Year)" ,"Net Energy For Load (Annual)",,"Contiguous U.S. ","Eastern Power Grid",,,,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"ECAR","FRCC","MAAC","MAIN","MAPP/MRO (U.S.) ","NPCC (U.S.)

  10. ,"Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Council Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    2005 and Projected 2006 through 2010 " ,"(Thousands of Megawatthours and 2005 Base Year)" ,"Net Energy For Load (Annual)",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"FRCC","MRO (U.S.) ","NPCC (U.S.) ","RFC","SERC","SPP","ERCOT","WECC (U.S.) "

  11. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Council Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    3 and Projected 2004 through 2008 " ,"(Megawatts and 2003 Base Year)",,,," " ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"ECAR","FRCC","MAAC","MAIN","MAPP (U.S.) ","NPCC (U.S.)

  12. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Council Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    4 and Projected 2005 through 2009 " ,"(Megawatts and 2004 Base Year)",,,," " ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"ECAR","FRCC","MAAC","MAIN","MAPP/MRO (U.S.) ","NPCC (U.S.)

  13. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Council Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    2005 and Projected 2006 through 2010 " ,"(Megawatts and 2005 Base Year)" ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"FRCC","MRO (U.S.) ","NPCC (U.S.) ","RFC","SERC","SPP","ERCOT","WECC (U.S.) "

  14. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Council Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    3 and Projected 2004 through 2008 " ,"(Megawatts and 2003 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"ECAR","FRCC","MAAC","MAIN","MAPP (U.S.) ","NPCC (U.S.) ","SERC","SPP","ERCOT","WECC (U.S.)

  15. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Council Region, "

    U.S. Energy Information Administration (EIA) Indexed Site

    4 and Projected 2005 through 2009 " ,"(Megawatts and 2004 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"ECAR","FRCC","MAAC","MAIN","MAPP/MRO (U.S.) ","NPCC (U.S.) ","SERC","SPP","ERCOT","WECC (U.S.)

  16. ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...

    U.S. Energy Information Administration (EIA) Indexed Site

    2008 " ,"(Megawatts and Percent)" ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

  17. ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...

    U.S. Energy Information Administration (EIA) Indexed Site

    2009 " ,"(Megawatts and Percent)" ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

  18. Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plan | Department of Energy 2 Annual Performance Report and FY 2003 Annual Performance Plan Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2002 actual performance and FY 2003 planned activities. PDF icon Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan More Documents & Publications Annual Performance

  19. Combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 6 Annual Performance Results and FY 2007 Annual Performance Plan Combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2006 actual performance and FY 2007 planned activities. PDF icon

  20. Combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 7 Annual Performance Results and FY 2008 Annual Performance Plan Combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2007 actual performance and FY 2008 planned activities. PDF icon

  1. Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 9 Annual Performance Results and FY 2010 Annual Performance Plan Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2009 actual performance and FY 2010 planned activities. PDF icon

  2. Combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 0 Annual Performance Results and FY 2011 Annual Performance Plan Combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2010 actual performance and FY 2011 planned activities. PDF icon

  3. Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 1 Annual Performance Results and FY 2012 Annual Performance Plan Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2011 actual performance and FY 2012 planned activities. PDF icon

  4. Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 Annual Performance Plan | Department of Energy 2 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2012 actual performance and FYs 2013

  5. Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 Annual Performance Plan | Department of Energy 3 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2013 actual performance and FYs 2014

  6. Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2016 Annual Performance Plan | Department of Energy 4 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2014 actual performance and FYs 2015

  7. Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan

    SciTech Connect (OSTI)

    Nielsen, T. ); Waage, E.; Miller, D. Corp., Boulder, CO )

    1990-01-01

    The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

  8. Projects of the year

    SciTech Connect (OSTI)

    Hansen, T.

    2007-01-15

    The Peabody Hotel, Orlando, Florida was the site of Power Engineering magazine's 2006 Projects of the Year Awards Banquet, which kicked-off the Power-Gen International conference and exhibition. The Best Coal-fired Project was awarded to Tri-State Generation and Transmission Association Inc., owner of Springenville Unit 3. This is a 400 MW pulverized coal plant in Springeville, AZ, sited with two existing coal-fired units. Designed to fire Powder River Basin coal, it has low NOx burners and selective catalytic reduction for NOx control, dry flue gas desulfurization for SO{sub 2} control and a pulse jet baghouse for particulate control. It has a seven-stage feedwater heater and condensers to ensure maximum performance. Progress Energy-Carolinas' Asheville Power Station FGD and SCR Project was awarded the 2006 coal-fired Project Honorable Mention. This plant in Skyland, NC was required to significantly reduce NOx emissions. When completed, the improvements will reduce NOx by 93% compared to 1996 levels and SO{sub 2} by 93% compared to 2001 levels. Awards for best gas-fired, nuclear, and renewable/sustainable energy projects are recorded. The Sasyadko Coal-Mine Methane Cogeneration Plant near Donezk, Ukraine, was given the 2006 Honorable Mention for Best Renewable/Sustainable Energy Project. In November 2004, Ukraine was among 14 nations to launch the Methane to Markets partnership. The award-winning plant is fuelled by methane released during coal extraction. It generates 42 MW of power. 4 photos.

  9. Concurrent Transfers Historical Yearly Peak

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the graph for current year shows the data for the year-to-date peak. Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily...

  10. Planning for Years to Come

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education ...

  11. ,"Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Assessment Area,"

    U.S. Energy Information Administration (EIA) Indexed Site

    1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Assessment Area," ,"1990-2010 Actual, 2011-2015 Projected" ,"(Thousands of Megawatthours)" ,"Interconnection","NERC Regional Assesment Area" ,,,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,"2011E","2012E","2013E","2014E","2015E" ,"Eastern

  12. ACTUAL-WASTE TESTS OF ENHANCED CHEMICAL CLEANING FOR RETRIEVAL OF SRS HLW SLUDGE TANK HEELS AND DECOMPOSITION OF OXALIC ACID

    SciTech Connect (OSTI)

    Martino, C.; King, W.; Ketusky, E.

    2012-01-12

    Savannah River National Laboratory conducted a series of tests on the Enhanced Chemical Cleaning (ECC) process using actual Savannah River Site waste material from Tanks 5F and 12H. Testing involved sludge dissolution with 2 wt% oxalic acid, the decomposition of the oxalates by ozonolysis (with and without the aid of ultraviolet light), the evaporation of water from the product, and tracking the concentrations of key components throughout the process. During ECC actual waste testing, the process was successful in decomposing oxalate to below the target levels without causing substantial physical or chemical changes in the product sludge.

  13. Aggregate Transfers Historical Yearly Peak

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transfers Historical Yearly Peak Aggregate Transfers Historical Yearly Peak These plots show the yearly peak days from 2000 to the present. BE CAREFUL because the graphs are autoscaling - check the scales on each axis before you compare graphs. Note that the graph for current year shows the data for the year-to-date peak. Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate Bandwidth Daily Aggregate

  14. Concurrent Transfers Historical Yearly Peak

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transfers Historical Yearly Peak Concurrent Transfers Historical Yearly Peak These plots show the yearly peak days from 2000 to present. BE CAREFUL because the graphs are autoscaling - check the scales on each axis before you compare graphs. Note that the graph for current year shows the data for the year-to-date peak. Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage Concurrency Daily Storage

  15. YEAR 2 BIOMASS UTILIZATION

    SciTech Connect (OSTI)

    Christopher J. Zygarlicke

    2004-11-01

    This Energy & Environmental Research Center (EERC) Year 2 Biomass Utilization Final Technical Report summarizes multiple projects in biopower or bioenergy, transportation biofuels, and bioproducts. A prototype of a novel advanced power system, termed the high-temperature air furnace (HITAF), was tested for performance while converting biomass and coal blends to energy. Three biomass fuels--wood residue or hog fuel, corn stover, and switchgrass--and Wyoming subbituminous coal were acquired for combustion tests in the 3-million-Btu/hr system. Blend levels were 20% biomass--80% coal on a heat basis. Hog fuel was prepared for the upcoming combustion test by air-drying and processing through a hammer mill and screen. A K-Tron biomass feeder capable of operating in both gravimetric and volumetric modes was selected as the HITAF feed system. Two oxide dispersion-strengthened (ODS) alloys that would be used in the HITAF high-temperature heat exchanger were tested for slag corrosion rates. An alumina layer formed on one particular alloy, which was more corrosion-resistant than a chromia layer that formed on the other alloy. Research activities were completed in the development of an atmospheric pressure, fluidized-bed pyrolysis-type system called the controlled spontaneous reactor (CSR), which is used to process and condition biomass. Tree trimmings were physically and chemically altered by the CSR process, resulting in a fuel that was very suitable for feeding into a coal combustion or gasification system with little or no feed system modifications required. Experimental procedures were successful for producing hydrogen from biomass using the bacteria Thermotoga, a deep-ocean thermal vent organism. Analytical procedures for hydrogen were evaluated, a gas chromatography (GC) method was derived for measuring hydrogen yields, and adaptation culturing and protocols for mutagenesis were initiated to better develop strains that can use biomass cellulose. Fly ash derived from cofiring coal with waste paper, sunflower hulls, and wood waste showed a broad spectrum of chemical and physical characteristics, according to American Society for Testing and Materials (ASTM) C618 procedures. Higher-than-normal levels of magnesium, sodium, and potassium oxide were observed for the biomass-coal fly ash, which may impact utilization in cement replacement in concrete under ASTM requirements. Other niche markets for biomass-derived fly ash were explored. Research was conducted to develop/optimize a catalytic partial oxidation-based concept for a simple, low-cost fuel processor (reformer). Work progressed to evaluate the effects of temperature and denaturant on ethanol catalytic partial oxidation. A catalyst was isolated that had a yield of 24 mole percent, with catalyst coking limited to less than 15% over a period of 2 hours. In biodiesel research, conversion of vegetable oils to biodiesel using an alternative alkaline catalyst was demonstrated without the need for subsequent water washing. In work related to biorefinery technologies, a continuous-flow reactor was used to react ethanol with lactic acid prepared from an ammonium lactate concentrate produced in fermentations conducted at the EERC. Good yields of ester were obtained even though the concentration of lactic acid in the feed was low with respect to the amount of water present. Esterification gave lower yields of ester, owing to the lowered lactic acid content of the feed. All lactic acid fermentation from amylose hydrolysate test trials was completed. Management activities included a decision to extend several projects to December 31, 2003, because of delays in receiving biomass feedstocks for testing and acquisition of commercial matching funds. In strategic studies, methods for producing acetate esters for high-value fibers, fuel additives, solvents, and chemical intermediates were discussed with several commercial entities. Commercial industries have an interest in efficient biomass gasification designs but are waiting for economic incentives. Utility, biorefinery, pulp and paper, or other industries are interested in lignin as a potential fuel or feedstock but need more information on properties.

  16. 60 Years of Computing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    60 Years of Computing 60 Years of Computing

  17. 2013 Director's New Year Address

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    has in store for the ALS. An immediate answer is - a celebration - as the ALS marks its 20th year of operation. We'll spend some time this year looking back at what we've...

  18. Microsoft Word - The Oppenheimer Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oppenheimer Years 1943-1945 At 5:29:45 am MWT on July 16, 1945, the world's first atomic ... He graduated summa cum laude three years later. Oppenheimer wanted to attend graduate ...

  19. WIPP_Marks_12_Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Marks 12 Years of Operations CARLSBAD, N.M., March 28, 2011 - On Saturday, March 26, 2011, ... It has now been 12 years since WIPP received its first shipment of transuranic (TRU) ...

  20. Year's End 2012 | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Year's End 2012 Year's End 2012 September 27, 2012 Throughout history, civilizations have developed their own calendars and commemorated the start of a New Year. Modern civilizations often have two calendars, the second being the financial calendar. In the United Kingdom and Japan the financial year starts on April 1. In the United States, the relevant date for the federal government is Oct. 1 - Monday, next week. Working in a national laboratory, our links to the national budget cycle are

  1. Transfer Activity Historical Yearly Peak

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Activity Historical Yearly Peak Transfer Activity Historical Yearly Peak The plots below show the yearly peak days from 2000 to the present. BE CAREFUL because the graphs are autoscaling - check the scales on each axis before you compare graphs. Note that the graph for the current year shows the data for the year-to-date peak. Transfers Started/In Progress Transfers Started/In Progress Transfers Started/In Progress Transfers Started/In Progress Transfers Started/In Progress Transfers Started/In

  2. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 21 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 5 Hispanic Female (H F) 3 White Male (W M) 26 White Female (W ...

  3. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 46 White Female (W ...

  4. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 4 Asian American Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 68 White Female (W ...

  5. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 3 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 13 Hispanic Female (H F) 10 White Male (W M) 43 White Female ...

  6. YEAR

    National Nuclear Security Administration (NNSA)

    Asian American Pacific Islander Male (AAPI M) 2 Asian American Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 12 Hispanic Female (H F) 12 White Male (W M) 34 White Female ...

  7. YEAR

    National Nuclear Security Administration (NNSA)

    White Male (W M) 13 White Female (W F) 5 DIVERSITY TOTAL WORKFORCE GENDER Savannah River ... ELIGIBLE TO RETIRE IMMEDIATELY 5 ELIGIBLE TO RETIRE IN 5 YRS BY 2019 9 Savannah River ...

  8. YEAR

    National Nuclear Security Administration (NNSA)

    2012 2013 SES 2 1 -50.00% EJEK 10 9 -10.00% EN 04 27 24 -11.11% NN (Engineering) 28 24 -14.29% NQ (ProfTechAdmin) 31 29 -6.45% NU (TechAdmin Support) 4...

  9. YEAR

    National Nuclear Security Administration (NNSA)

    SES 1 2 100.00% EJEK 2 2 0.00% EN 04 1 1 0.00% EN 03 1 0 -100.00% NN (Engineering) 12 11 -8.33% NQ (ProfTechAdmin) 216 218 0.93% NU (TechAdmin Support) 2...

  10. YEAR

    National Nuclear Security Administration (NNSA)

    2013 SES 2 2 0.00% EJEK 7 8 14.29% EN 04 11 11 0.00% EN 03 1 1 0.00% NN (Engineering) 23 24 4.35% NQ (ProfTechAdmin) 35 32 -8.57% NU (TechAdmin Support) 3 2...

  11. YEAR

    National Nuclear Security Administration (NNSA)

    1.6% 6.6% 0.7% 17.5% 49.7% 2.7% 13.4% 0.1% 0.1% 0.1% Pay Plan Males 66.5% Females 33.5% Gender AIAN M AIAN F AA M AA F AAPI M AAPI F H M H F W M W F 1.1% 1.0% 3.7% 5.8% 2.6% 1.0%...

  12. Characterization, Leaching, and Filtration Testing for Bismuth Phosphate Sludge (Group 1) and Bismuth Phosphate Saltcake (Group 2) Actual Waste Sample Composites

    SciTech Connect (OSTI)

    Lumetta, Gregg J.; Buck, Edgar C.; Daniel, Richard C.; Draper, Kathryn; Edwards, Matthew K.; Fiskum, Sandra K.; Hallen, Richard T.; Jagoda, Lynette K.; Jenson, Evan D.; Kozelisky, Anne E.; MacFarlan, Paul J.; Peterson, Reid A.; Shimskey, Rick W.; Sinkov, Sergey I.; Snow, Lanee A.

    2009-02-19

    A testing program evaluating actual tank waste was developed in response to Task 4 from the M-12 External Flowsheet Review Team (EFRT) issue response plan.() The test program was subdivided into logical increments. The bulk water-insoluble solid wastes that are anticipated to be delivered to the Waste Treatment and Immobilization Plant (WTP) were identified according to type such that the actual waste testing could be targeted to the relevant categories. Eight broad waste groupings were defined. Samples available from the 222S archive were identified and obtained for testing. The actual waste-testing program included homogenizing the samples by group, characterizing the solids and aqueous phases, and performing parametric leaching tests. Two of the eight defined groups—bismuth phosphate sludge (Group 1) and bismuth phosphate saltcake (Group 2)—are the subjects of this report. The Group 1 waste was anticipated to be high in phosphorus and was implicitly assumed to be present as BiPO4 (however, results presented here indicate that the phosphate in Group 1 is actually present as amorphous iron(III) phosphate). The Group 2 waste was also anticipated to be high in phosphorus, but because of the relatively low bismuth content and higher aluminum content, it was anticipated that the Group 2 waste would contain a mixture of gibbsite, sodium phosphate, and aluminum phosphate. Thus, the focus of the Group 1 testing was on determining the behavior of P removal during caustic leaching, and the focus of the Group 2 testing was on the removal of both P and Al. The waste-type definition, archived sample conditions, homogenization activities, characterization (physical, chemical, radioisotope, and crystal habit), and caustic leaching behavior as functions of time, temperature, and hydroxide concentration are discussed in this report. Testing was conducted according to TP-RPP-WTP-467.

  13. PADUCAH 2015 YEAR IN REVIEW

    Energy Savers [EERE]

    PADUCAH 2015 YEAR IN REVIEW "2015 has been a pivotal year at the Paducah Site. Now that we have successfully transitioned the gaseous diffusion plant from NRC oversight to DOE oversight and DOE has the entire site back for the first time in almost 20 years, major deactivation activities are under way to prepare the site for future decontamination and decommissioning. We are fortunate to have a highly skilled federal and contractor workforce in place to safely and successfully continue this

  14. Weldon spring site environmental report for calendar year 1996. Revision 0

    SciTech Connect (OSTI)

    1997-07-23

    This Site Environmental Report for Calendar Year 1996 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels and regulations, and to summarize trends and/or changes in contaminant concentrations identified through environmental monitoring.

  15. NETL: The First 100 Years

    SciTech Connect (OSTI)

    2015-07-21

    The National Energy Technology Laboratory celebrates 100 years of innovative energy technology development. NETL has been a leader in energy technology development. This video takes a look back at the many accomplishments over the past 100 years. These advances benefit the American people, enhance our nation's energy security and protect our natural resources.

  16. Good Year - Bad Year Financial Planning Workshop handout - April...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    unit's financial reserve balance at the end of a year or be used as an input for a TPP assessment. This metric is the most direct measure of BPA's ability to pay Treasury....

  17. Visualizing Twenty Years of Applications

    SciTech Connect (OSTI)

    Potel, Mike; Wong, Pak C.

    2014-11-01

    This issue of IEEE Computer Graphics and Applications marks the 20th anniversary of the Applications department as a regular feature of the magazine. We thought it might be interesting to look back at the 20 years of Applications department articles to assess its evolution over that time. By aggregating all twenty years of articles and applying a little statistical and visual analytics, we’ve uncovered some interesting characteristics and trends we thought we’d share to mark this 20 year milestone.

  18. 2014 Year-in-Review

    Energy Savers [EERE]

    4 Year-in-Review i 2014 YIR May 2015 Year-in-Review: 2014 Energy Infrastructure Events and Expansions Office of Electricity Delivery and Energy Reliability U.S. Department of Energy For Further Information This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and Thomas Roston, Acting Deputy Assistant Secretary. Specific questions about this report may be directed to John Ostrich, Office of Electricity

  19. PORTSMOUTH 2015 YEAR IN REVIEW

    Energy Savers [EERE]

    PORTSMOUTH 2015 YEAR IN REVIEW At the Portsmouth site this year, it was critical to have alignment among regulatory decisions and agreements, deactivation, shipping, and preliminary work on the on-site waste disposal facility. In 2015, we made significant progress in all of those areas. Our workforce performed admirably in 2015 and we look forward to continuing our momentum in 2016." - Dr. Vincent Adams, Portsmouth Site Director, DOE Portsmouth/Paducah Project Office KEY ACCOMPLISHMENTS 

  20. They're Here! Winter, Holidays, and the New Year. How Will You Save Energy?

    Energy Savers [EERE]

    | Department of Energy They're Here! Winter, Holidays, and the New Year. How Will You Save Energy? They're Here! Winter, Holidays, and the New Year. How Will You Save Energy? December 22, 2009 - 10:11am Addthis Winter officially hit this week, and those of you on the east coast found out in a big way. Many of you are still shoveling out while trying to take care of those last-minute holiday preparations. (I'm actually kind of jealous. I love shoveling snow. I just hate driving in it.)

  1. Draft dry year tools (generation/planning)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA White Book Dry Year Tools Firstgov Dry Year Tools November 9, 2006 - Final Dry Year Guide: The Final Dry Year Guide (PDF, 5 pages, 44 kb) and Figure 1 - Dry Year Strategy (PDF,...

  2. LNG to the year 2000

    SciTech Connect (OSTI)

    Davenport, S.T.

    1984-04-01

    By 2000, about 190 MM metric-tpy of LNG will be moving in world trade, with Asia-Pacific as the dominant producer By the year 2000, approximately 190 million metric tons per year of LNG will be moving in worldwide trade. Production of LNG will be spread throughout most of the world, with Asia-Pacific as the dominant producer. LNG will be delivered only to the heavily industrialized areas of North America, Europe and Asia-Pacific. The success of any LNG project will be dependent on its individual economics, market needs, financial planning, and governmental permit processes. We hope industry will be able to put together the LNG projects required to meet the quanitities of production forecast here for the year 2000.

  3. Two Year Difference | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Two Year Difference Two Year Difference May 19, 2014 On May 19, 2012, we held an Open House; on Saturday, May 17, 2014, we held an Open House; it's a habit. And what a day we had on Saturday! The weather was perfect. The extent to which we are able to open the lab is a major surprise for many visitors. They arrive with the expectation that maybe we open one building with displays. Instead, they find themselves getting into the accelerator, the Central Helium Liquefier, and ALL the experimental

  4. Calendar Year Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Calendar Year Reports Calendar Year Reports Audit, Inspection and Other Reports The majority of Office of Inspector General reports are public. Certain reports, however, are not public as they contain information that is protected by the Freedom of Information Act (FOIA) and Privacy Act. The provisions of these acts determine the availability of these reports. Calendar Year 2016 Calendar Year 2015 Calendar Year 2014 Calendar Year 2013 Calendar Year 2012 Calendar Year 2011 Calendar Year 2010

  5. FEMP Year in Review 2009

    SciTech Connect (OSTI)

    2009-12-01

    In 2009, the Federal Energy Management Program (FEMP)undertook an ambitious reorganization of its program structure to be more responsive to the needs of its Federal agency customers. In this Year in Review 2009, you will learn more about FEMP achievements under its new program areas.

  6. Nuclear Materials Focus Area Fiscal Year 2002 Mid Year Review

    SciTech Connect (OSTI)

    Thiel, Elizabeth Chilcote

    2002-05-01

    The Nuclear Materials Focus Area (NMFA) held its annual mid-year review on February 12 and 14, 2002, in Santa Fe, New Mexico. The purpose of this review was to examine both the technical aspects and the programmatic aspects of its technology development program. The focus area activities were reviewed by a panel consisting of personnel representing the end users of the technologies, and technical experts in nuclear materials. This year's review was somewhat different than in the past, as the stress was on how well the various projects being managed through the NMFA aligned with the two thrust areas and nine key goals and priorities recently issued by the Deputy Assistant Secretary for DOE's Office of Environmental Management (EM).

  7. Nuclear Materials Focus Area Fiscal Year 2002 Mid Year Review

    SciTech Connect (OSTI)

    Thiel, E.C.; Fuhrman, P.W.

    2002-05-30

    The Nuclear Materials Focus Area (NMFA) held its annual mid-year review on February 12 and 14, 2002, in Santa Fe, New Mexico. The purpose of this review was to examine both the technical aspects and the programmatic aspects of its technology development program. The focus area activities were reviewed by a panel consisting of personnel representing the end users of the technologies, and technical experts in nuclear materials. This year's review was somewhat different than in the past, as the stress was on how well the various projects being managed through the NMFA aligned with the two thrust areas and nine key goals and priorities recently issued by the Deputy Assistant Secretary for DOE's Office of Environmental Management (EM).

  8. SU-E-T-417: A Method for Predicting and Correcting the Dosimetric Effect of a Radiotherapy Treatment Couch in Actual Treatment Position

    SciTech Connect (OSTI)

    Duan, J; Shen, S; Wu, X; Huang, M; Benhabib, S; Cardan, R; Popple, R; Brezovich, I

    2014-06-01

    Purpose: Although radiation attenuation by the treatment couch can be included in the calculation of radiotherapy dose, difference between planned and actual treatment couch positions can generate significant dose discrepancies. We propose a method to predict and correct the dosimetric effect of the couch in actual treatment position. Methods: The couch transmission factor, T, varies with beam angle, G, couch lateral position, x, and vertical position, y, i.e., T=T(x,y,G). If T(x,y,G) is known for a fixed couch vertical position y=h, the transmission of central-axis beam (CAX) T(x,y,G) can be obtained by T(x,y,G)=T(x{sup +},h,G), where x{sup +}=x-(y-h)tan(G) and G is the angle between the beam and the vertical axis. Similarly, the transmission of any off-CAX point can be obtained using a similar formula. We measured CAX couch transmission at a fixed couch vertical position over the couch lateral motion range for all gantry angles by continuously scanning rotating arc beams. A 2D couch transmission correction matrix can thus be generated from T(x,h,G) for each treatment field for the actual couch position. By applying the transmission correction matrix to the planned field dose, the couch effect can be predicted and corrected. To verify this method, we measured couch transmission T(x, y=10cm, G=225)(225=IEC 135) and compared to that obtained from equivalent T(x{sup +}, y=3cm, G=225) over the range of lateral motion with a step size of 2 cm . Results: The measured couch transmission factors T(x, y=10cm, G=225) are in excellent agreement with those obtained from the equivalent T(x{sup +}, y=3cm, G=225). The mean difference is 0.004060.00135. Conclusion: The couch transmission correction matrix for any couch position and beam angle can be obtained from one set of scanning measurements at a fixed couch vertical position. The dosimetric effect of the treatment couch can be predicted and corrected by applying the couch transmission correction to the planned dose.

  9. DESTRUCTION OF TETRAPHENYLBORATE IN TANK 48H USING WET AIR OXIDATION BATCH BENCH SCALE AUTOCLAVE TESTING WITH ACTUAL RADIOACTIVE TANK 48H WASTE

    SciTech Connect (OSTI)

    Adu-Wusu, K; Paul Burket, P

    2009-03-31

    Wet Air Oxidation (WAO) is one of the two technologies being considered for the destruction of Tetraphenylborate (TPB) in Tank 48H. Batch bench-scale autoclave testing with radioactive (actual) Tank 48H waste is among the tests required in the WAO Technology Maturation Plan. The goal of the autoclave testing is to validate that the simulant being used for extensive WAO vendor testing adequately represents the Tank 48H waste. The test objective was to demonstrate comparable test results when running simulated waste and real waste under similar test conditions. Specifically: (1) Confirm the TPB destruction efficiency and rate (same reaction times) obtained from comparable simulant tests, (2) Determine the destruction efficiency of other organics including biphenyl, (3) Identify and quantify the reaction byproducts, and (4) Determine off-gas composition. Batch bench-scale stirred autoclave tests were conducted with simulated and actual Tank 48H wastes at SRNL. Experimental conditions were chosen based on continuous-flow pilot-scale simulant testing performed at Siemens Water Technologies Corporation (SWT) in Rothschild, Wisconsin. The following items were demonstrated as a result of this testing. (1) Tetraphenylborate was destroyed to below detection limits during the 1-hour reaction time at 280 C. Destruction efficiency of TPB was > 99.997%. (2) Other organics (TPB associated compounds), except biphenyl, were destroyed to below their respective detection limits. Biphenyl was partially destroyed in the process, mainly due to its propensity to reside in the vapor phase during the WAO reaction. Biphenyl is expected to be removed in the gas phase during the actual process, which is a continuous-flow system. (3) Reaction byproducts, remnants of MST, and the PUREX sludge, were characterized in this work. Radioactive species, such as Pu, Sr-90 and Cs-137 were quantified in the filtrate and slurry samples. Notably, Cs-137, boron and potassium were shown as soluble as a result of the WAO reaction. (4) Off-gas composition was measured in the resulting gas phase from the reaction. Benzene and hydrogen were formed during the reaction, but they were reasonably low in the off-gas at 0.096 and 0.0063 vol% respectively. Considering the consistency in replicating similar test results with simulated waste and Tank 48H waste under similar test conditions, the results confirm the validity of the simulant for other WAO test conditions.

  10. Assessing middle school students` understanding of science relationships and processes: Year 2 - instrument validation. Final report

    SciTech Connect (OSTI)

    Schau, C.; Mattern, N.; Weber, R.; Minnick, K.

    1997-01-01

    Our overall purpose for this multi-year project was to develop an alternative assessment format measuring rural middle school students understanding of science concepts and processes and the interrelationships among them. This kind of understanding is called structural knowledge. We had 3 major interrelated goals: (1) Synthesize the existing literature and critically evaluate the actual and potential use of measures of structural knowledge in science education. (2) Develop a structural knowledge alternative assessment format. (3) Examine the validity of our structural knowledge format. We accomplished the first two goals during year 1. The structural knowledge assessment we identified and developed further was a select-and-fill-in concept map format. The goal for our year 2 work was to begin to validate this assessment approach. This final report summarizes our year 2 work.

  11. Fiscal Year 2012 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2012-11-01

    This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  12. Fiscal Year 2013 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2013-11-01

    This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  13. Hanford Site environmental surveillance data report for calendar year 1995

    SciTech Connect (OSTI)

    Bisping, L.E.

    1996-07-01

    Environmental surveillance at the Hanford Site collects data that provides a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford operations. Data are also collected to monitor several chemicals and metals in Columbia River Water and Sediment. Pacific Northwest National Laboratory publishes an annual environmental report for the Hanford Site each calendar year. The Hanford Site Environmental Report for Calendar Year 1995 describes the Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, and environmental monitoring activities and results. The report includes a summary of offsite and onsite environmental monitoring data collected during 1995 by PNNL`s Environmental Monitoring Program. Appendix A of that report contains data summaries created from raw surface, river monitoring data, and chemical air data. This volume contains the actual raw data used to create the summaries. The data volume also includes Hanford Site drinking water radiological data.

  14. Hanford Site environmental surveillance data report for calendar year 1996

    SciTech Connect (OSTI)

    Bisping, L.E.

    1997-09-01

    Environmental surveillance at the Hanford Site collects data that provides a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford operations. Data are also collected to monitor several chemicals and metals in Columbia River water and sediment. In addition, Hanford Site wildlife samples were also collected for metals analysis. Pacific Northwest National Laboratory publishes an annual environmental report for the Hanford Site each calendar year. The Hanford Site Environmental Report for Calendar Year 1996 describes the site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, and environmental monitoring activities and results. The report includes a summary of offsite and onsite environmental monitoring data collected during 1996 by PNNL`s Environmental Monitoring Program. Appendix A of that report contains data summaries created from river monitoring and sediment data. This volume contains the actual raw data used to create the summaries. The data volume also includes Hanford Site drinking water radiological data.

  15. Twenty Years of Clean Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Twenty Years of Clean Energy For more information contact: George Douglas (303) 275-4096 e-mail: george_douglas@nrel.gov Golden, Colo., July 3, 1997--A doctor stores a life-saving vaccine in a solar-powered refrigerator in a remote Brazilian village, hundreds of miles from the nearest power line. Turbines in California harness the power of the wind to produce economically competitive electricity without producing pollution. Instead of fueling a forest fire, tinder-dry fallen timber littering the

  16. Fiscal Year 2010 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom; Mike Lewis

    2010-11-01

    This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

  17. Fiscal Year 2009 Revegetation Assessment

    SciTech Connect (OSTI)

    Michael Lewis

    2009-10-01

    This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Recommendation(s) for each site.

  18. Yearly Energy Costs for Buildings

    Energy Science and Technology Software Center (OSTI)

    1991-03-20

    COSTSAFR3.0 generates a set of compliance forms which will be attached to housing Requests for Proposals (RFPs) issued by Departments or Agencies of the Federal Government. The compliance forms provide a uniform method for estimating the total yearly energy cost for each proposal. COSTSAFR3.0 analyzes specific housing projects at a given site, using alternative fuel types, and considering alternative housing types. The program is designed around the concept of minimizing overall costs through energy conservationmore » design, including first cost and future utility costs, and estabilishes a standard design to which proposed housing designs are compared. It provides a point table for each housing type that can be used to determine whether a proposed design meets the standard and how a design can be modified to meet the standard.« less

  19. Fiscal Year 2014 Revegetation Assessment

    SciTech Connect (OSTI)

    Nordstrom, Jenifer

    2015-03-01

    This report summarizes the Fiscal Year 2014 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to document revegetation efforts at Idaho National Laboratory to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Five disturbed sites were evaluated for this assessment. Four sites are recommended to be removed from the annual assessment, and one is recommended for continued evaluation. New sites are also identified for future monitoring as part of the annual assessment.

  20. Fiscal year 1987 program plan

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

  1. NREL: Technology Deployment - Greensburg, Kansas, Five Years...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Greensburg, Kansas, Five Years Later-An International Inspiration for Green Disaster ... Now, five years later-Greensburg has become an international inspiration for green ...

  2. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Weyl Fermions Discovered After 85 Years Print Wednesday, 09 December 2015 00:00 An international team led by Princeton University scientists ...

  3. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: ...

  4. NERSC: 40 YEARS AT THE FOREFRONT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CALENDAR CSO 0019 NERSC: 40 YEARS AT THE FOREFRONT In 1974, an almost-obsolete ... Scientific Computing Center. Through the years, NERSC's mission has remained consistent: ...

  5. NERSC Celebrates 40 Years at the Forefront

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC Celebrates 40 Years of Supercomputing NERSC Celebrates 40 Years at the Forefront DOE supercomputing facility has been supporting broad-based scientific research since 1974 ...

  6. The Geothermal Technologies Office Congratulates this Year's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Geothermal Technologies Office Congratulates this Year's GEA Honors Awardees The Geothermal Technologies Office Congratulates this Year's GEA Honors Awardees December 11, 2013...

  7. Environmental Monitoring and Remediation Committee Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Monitoring and Remediation Committee Fiscal Year 2015 Work Plan Topics: ... More Documents & Publications Waste Management Committee Fiscal Year 2015 Work Plan ...

  8. Environmental Monitoring and Remediation Committee Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Monitoring and Remediation Committee Fiscal Year 2016 Work Plan Topics: ... Environmental Monitoring and Remediation Committee Fiscal Year 2015 Work Plan Waste ...

  9. Three Year Rolling Timeline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Three Year Rolling Timeline Three Year Rolling Timeline PDF icon The Department&#8217;s real property assets are vital to the accomplishment of its mission More Documents & Publications FY2012 Three Year Rolling Timeline Three-year Rolling Timeline The Department&#8217;s real property assets are vital to the accomplishment of its mission

  10. The coming year - 2012 | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The coming year - 2012 The coming year - 2012 January 17, 2011 It has not been our habit to use these articles to record the mundane passage of time, the annual holidays, the turn of the fiscal year or, in general, the turn of the calendar year. On the other hand, we are about to start a calendar year with a budget for the rest of the fiscal year already decided, at least at the higher levels. Just before the end of the year, Congress passed, and the President signed, the legislation determining

  11. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    SciTech Connect (OSTI)

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state`s 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs.

  12. ALS History: The First 20 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History: The First 20 Years Print Below is an interactive timeline covering highlights of the first 20 years of ALS history. By no means exhaustive, it is meant to provide a broad ...

  13. After 5 Years, NERSC's Franklin Retires

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    After 5 Years, NERSC's Franklin Retires After 5 Years, NERSC's Franklin Retires May 4, 2012 Linda Vu, lvu@lbl.gov, +1 510 495 2402 Franklin Cray XT4 supercomputer: Franklin Cray ...

  14. Top 10 science stories of the year

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Top 10 science stories of the year Top 10 science stories of the year From supercomputers and climate modeling, to cybersecurity and cancer treatments, Los Alamos worked hard in ...

  15. CERCLA Five-Year Review - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RIFS Sitewide Probabilistic Seismic Hazard Analysis Environmental CERCLA Five-Year Review Third CERCLA Five-Year Review...

  16. Program Year 2008 State Energy Program Formula

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) State Energy Program (SEP), SEP Program Guidance Fiscal Year 2008, Program Year 2008, energy efficiency and renewable energy programs in the states, DOE Office of Energy Efficiency and Renewable Energy

  17. Environmental Monitoring and Remediation Committee Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Monitoring and Remediation Committee Fiscal Year 2014 Work Plan Topics: ... More Documents & Publications Environmental Monitoring and Remediation Committee Fiscal ...

  18. Environmental Monitoring and Remediation Committee Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Monitoring and Remediation Committee Fiscal Year 2013 Work Plan Topics: ... More Documents & Publications Environmental Monitoring and Remediation Committee Fiscal ...

  19. Secretary Chu Celebrates NNSA's 10-Year Anniversary

    ScienceCinema (OSTI)

    Department of Energy Secretary Steven Chu

    2010-09-01

    Department of Energy Secretary Steven Chu speaks at NNSA's 10-year anniversary celebration on April 28, 2010.

  20. Google Archives by Fiscal Year — Solar

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Solar Energy Technologies Office, retired Google Analytics profiles for the sites by fiscal year.

  1. Webtrends Archives by Fiscal Year — Solar

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Solar Energy Technologies Office / Sunshot sites, Webtrends archives by fiscal year.

  2. Webtrends Archives by Fiscal Year — Education

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Education site by fiscal year.

  3. Google Archives by Fiscal Year — FEMP

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Federal Energy Management Program, retired Google Analytics profiles for the sites by fiscal year.

  4. Google Archives by Fiscal Year — Buildings

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Building Technologies Office, retired Google Analytics profiles for the sites by fiscal year.

  5. Fiscal Year 2009 budget-in-brief

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Fiscal Year 2009 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy.

  6. Fiscal Year 2007 budget-in-brief

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Fiscal Year 2007 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy.

  7. Fiscal Year 2008 budget-in-brief

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Fiscal Year 2008 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy.

  8. Google Archives by Fiscal Year — Greensburg

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profile for the Greensburg site for fiscal year 2012.

  9. Cray and NERSC Through the Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jeff Brooks Cray and NERSC Through the Years February 5, 2014 Jeff Brooks, Cray Downloads NERSCandCray40YearBrooks.pdf | Adobe Acrobat PDF file Cray and NERSC Through the Years Last edited: 2014-02-14 16:33:27

  10. Museum Closed for New Year's Holiday

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Museum Closed for New Year's Holiday Museum Closed for New Year's Holiday WHEN: Jan 01, 2016 12:00 AM - 11:59 PM WHERE: Bradbury Science Museum 1350 Central Ave, Los Alamos, NM 87544, USA CATEGORY: Bradbury INTERNAL: Calendar Login Museum Closed for New Year's Holiday Event Description The Bradbury Science Museum will be CLOSED for the New Year's holiday. The Bradbury Science Museum is open to the public every day except for Thanksgiving Day, Christmas Day and New Year's Day. Admission is always

  11. Hanford Site Environmental Surveillance Data Report for Calendar Year 2000

    SciTech Connect (OSTI)

    Bisping, Lynn E.

    2001-09-27

    This data report contains the actual raw data used to create tables and summaries in the Hanford Site Environmental Report 2000. This report also includes data from special sampling studies performed in 2000.

  12. Agency Improvement Plan For Fiscal Year 2006 and Fiscal Year 2007 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Agency Improvement Plan For Fiscal Year 2006 and Fiscal Year 2007 Agency Improvement Plan For Fiscal Year 2006 and Fiscal Year 2007 Department of Energy Report and Agency Improvement Plan,For Fiscal Year 2006 and Fiscal Year 2007 PDF icon Agency Improvement Plan For Fiscal Year 2006 and Fiscal Year 2007 More Documents & Publications Office of Information Resources (MA-90) Microsoft Word - DOE E-Government Act Report 11.16.06 Final.doc FY 2008 E-Government Act Repo

  13. NERSC Celebrates 40 Years at the Forefront

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC Celebrates 40 Years of Supercomputing NERSC Celebrates 40 Years at the Forefront DOE supercomputing facility has been supporting broad-based scientific research since 1974 January 29, 2014 Contact: Kathy Kincade, KKincade@lbl.gov, +1 510 495 2124 horstsimon2013 Horst Simon This year, the Department of Energy's (DOE) National Energy Research Scientific Computing Center (NERSC) is celebrating yet another milestone: its 40th anniversary. Since its founding in 1974, NERSC has become the

  14. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Weyl Fermions Discovered After 85 Years Print Wednesday, 09 December 2015 00:00 An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure

  15. Lab celebrates 50 years in space

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    celebrates 50 years in space Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:May 2016 all issues All Issues » submit Lab celebrates 50 years in space National security missions and pure research December 1, 2013 Lab celebrates 50 years in space Lab's instruments have helped detect possible nuclear weapon detonations and led to fundamental scientific discoveries. Contacts Community Programs Office Director Kurt Steinhaus Email Editor

  16. Sandia's Cooperative Monitoring Center celebrates 20 years |...

    National Nuclear Security Administration (NNSA)

    Cooperative Monitoring Center celebrates 20 years Tuesday, November 18, 2014 - 4:10pm Sandia National Laboratories' Cooperative Monitoring Center is celebrating its 20th ...

  17. Richland Operations Office's Fiscal Year 2013...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2012 through September 2013 (fiscal year 2013) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 14,092,235 (includes fee set...

  18. Calendar Year 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy's Fiscal Year 2013 Consolidated Financial Statements December 6, 2013 Special Report: IG-0900 Department of Energy's July 2013 Cyber Security Breach November ...

  19. Fiscal Year 2010 Budget-in-Brief

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency and Renewable Energy Fiscal Year 2010 Budget-in-Brief www.eere.energy.gov Table of Contents Table of Contents...................................................................................................................................... 2 Preface ...................................................................................................................................................... 3 Highlights:

  20. Google Archives by Fiscal Year — ERAC

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profile for the Efficiency and Renewables Advisory Committee site for fiscal year 2012-13.

  1. FTCP Annual Report- Calendar Year 2007

    Broader source: Energy.gov [DOE]

    Report summarizes the yearly actions taken to ensure organizations maintain their critical technical capabilities needed for the safe operations of defense nuclear facilities.

  2. Secretary Moniz's First Year | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    First Year Secretary Moniz's First Year May 21, 2014 - 9:21am Addthis Marissa Newhall Marissa Newhall Director of Digital Strategy and Communications It's been one year since Dr. Ernest J. Moniz was sworn in as the 13th U.S. Secretary of Energy. Since then, he's been busy. We're marking the occasion with a look back at some big moments from Secretary Moniz's first year in office -- including landmark energy policy speeches, visits to some of the Energy Department's National Labs, the launch of

  3. Allocation Year Rollover: 2015 to 2016

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Allocation Year Rollover Allocation Year Rollover: 2015 to 2016 Note: Allocation Year 2015 (AY15) ends at 23:59:59 on Monday, January 11, 2016. AY16 runs from Tuesday, January 12, 2016 through Monday, January 09, 2017. Below are major changes that will go into effect with the beginning of AY16 on Tuesday, January 12, 2016. All times listed are PST. Scheduled Systems and Services Downtimes There will be no computational systems disruptions during the allocation year rollover and jobs will run

  4. Webtrends Archives by Fiscal Year - Business Administration ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business Administration Webtrends Archives by Fiscal Year - Business Administration From the EERE Web Statistics Archive: Office of Business Administration (later renamed to ...

  5. Webtrends Archives by Fiscal Year - Commercialization | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercialization Webtrends Archives by Fiscal Year - Commercialization From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Commercialization site by ...

  6. Webtrends Archives by Fiscal Year — WIP

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: WIP, Webtrends archives for the site, including EECBG, Solution Center, and Weatherization Assistance Program, by fiscal year.

  7. EMSL Fiscal Year 2008 Annual Report

    SciTech Connect (OSTI)

    Showalter, Mary Ann

    2009-01-23

    This annual report provides details on the research conducted at EMSL--the Environmental Molecular Sciences Laboratory in Fiscal Year 2008.

  8. Calendar Year 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 30, 2013, Under Department of Energy Contract No. ... Department of Energy's Nuclear Waste Fund's Fiscal Year 2014 ... Allegation Regarding Human Reliability Program Unsuitable ...

  9. FTCP Annual Report- Fiscal Year 2004

    Broader source: Energy.gov [DOE]

    Report summarizes the yearly actions taken to ensure organizations maintain their critical technical capabilities needed for the safe operations of defense nuclear facilities.

  10. 1999 Commercial Building Characteristics--Detailed Tables--Year...

    U.S. Energy Information Administration (EIA) Indexed Site

    Year Constructed > Detailed Tables-Year Constructed Complete Set of 1999 CBECS Detailed Tables Detailed Tables-Year Constructed Table B8. Year Constructed, Number of Buildings...

  11. ,"Projected Monthly Base","Year","Contiguous U.S.","Eastern Power Grid",,,,,,,,"Texas Power Grid","Western Power Grid"

    U.S. Energy Information Administration (EIA) Indexed Site

    ","Table 3a. January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Council Region, " ,"1996 through 2004 and Projected 2005 through 2006 " ,"(Megawatts and 2004 Base Year)" ,"Projected Monthly Base","Year","Contiguous U.S.","Eastern Power Grid",,,,,,,,"Texas Power Grid","Western Power Grid"

  12. Calendar Year 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Calendar Year 2016 Calendar Year 2016 May 6, 2016 Audit Report: OAI-FS-16-09 Management Letter on the Western Federal Power System's Fiscal Year 2015 Financial Statement Audit May 6, 2016 Inspection Report: OAI-L-16-09 Review of Management and Accountability of Sealed Radioactive Sources Maintained at Department Sites May 2, 2016 Audit Report: DOE-OIG-16-12 The Department of Energy's Energy Information Technology Services Federal Support Costs April 26, 2016 Special Report: OIG-SR-16-02 The

  13. Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End

    Energy Savers [EERE]

    Summary Report | Department of Energy 3 Year-End Summary Report Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011-2020 Strategic Plan (DOE 2011). PDF icon Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report More Documents & Publications Long-Term Surveillance Operations and Maintenance Fiscal Year

  14. PHMC Year 2000: Status reporting for mission essential Year 2000 projects. Revision 0, Volume 3

    SciTech Connect (OSTI)

    Layfield, K.A.

    1998-09-02

    The PHMC Year 2000 status reporting process is designed to encompass the reporting requirements of the Office of Management and Budget (OMB), DOE HQ, RL and the PHMC for mission essential Year 2000 projects. Status reporting is required for all Year 2000 projects. The Year 2000 project list will be maintained current as Year 2000 projects are modified, added or deleted. Reporting is required until a Year 2000 project has completed compliance assurance. Some projects will be identified as DOE HQ reportable. These are projects determined to be the most critical and due the attention of DOE HQ.

  15. Reconciliation of differences in the results of published shortfall analyses of 1981 model year cars

    SciTech Connect (OSTI)

    Not Available

    1983-09-06

    The failure of a vehicle to achieve its EPA mpg rating on the road is termed shortfall. Shortfall can be expressed in terms of either fuel economy (mpg) or fuel consumption (gpm). A vehicle achieving 25 mpg on the road but rated at 30 mpg in terms of the EPA 55/45 composite is said to show 16.7 percent shortfall in terms of mpg but 20 percent shortfall in terms of gpm. It can also be said that the EPA estimate overstates actual mpg performance by 20 percent. Specifically, this report has dealt with points of agreement and disagreement of GM, Ford, DOE and EPA with regard to: (1) overall shortfall, (2) mpg dependence of shortfall, (3) technology dependence of shortfall, and (4) model-year trends in shortfall. Our summary and conclusions with regard to each of these concerns are presented.

  16. 2015 NCAI Mid-Year Conference

    Broader source: Energy.gov [DOE]

    The National Congress of American Indians is hosting their annual mid-year conference in St. Paul, Minnesota, on June 28-July 1, 2015. This event features subcommittee meetings, booths, and more.

  17. Fiscal Year 2008 Budget-in-Brief

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency and Renewable Energy Fiscal Year 2008 Budget-in-Brief www.eere.energy.gov TABLE OF CONTENTS Page Preface...................................................................................................................................................... 3 Biomass and Biorefinery Systems R&D Program.................................................................................. 6 Building Technologies Program

  18. Classification CommuniQué- Year: 2013

    Broader source: Energy.gov [DOE]

    Classification newsletters for the year 2013, consisting of the following issues: CommuniQué 2013-1 - Spring 2013 CommuniQué 2013-2 - Fall 2013

  19. Mo Year Report Period: EIA ID NUMBER:

    U.S. Energy Information Administration (EIA) Indexed Site

    Mo Year Report Period: EIA ID NUMBER: http:www.eia.govsurveyformeia14instructions.pdf Mailing Address: Secure File Transfer option available at: (e.g., PO Box, RR) https:...

  20. Calendar Year 1999 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 25, 1999 Audit Report: ER-FS-99-01 Results of Audit Procedures Performed at Chicago Operations Office During the Audit of the Department's Consolidated Fiscal Year 1998...

  1. EERE Fiscal Year 2012 Website Annual Report

    Broader source: Energy.gov (indexed) [DOE]

    At the end of Fiscal Year 2012 (FY12), the EERE Web enterprise consisted of 152 websites ... to begin the process of aligning its Web presence with energy.gov, DOE's central website. ...

  2. EERE Fiscal Year 2011 Website Annual Report

    Broader source: Energy.gov (indexed) [DOE]

    Views 05 Average Visit Duration 06 Top 20 Web Sites by Visits 06 Top 20 Visited Pages 07 ... At the end of fiscal year 2011 (FY11), the EERE Web enterprise consisted of more than 170 ...

  3. Webtrends Archives by Fiscal Year — Vehicles

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Vehicle Technologies Office, Webtrends archives for the site, including the Alternative Fuels Data Center, EPAct Transportation Regulatory Activities, and Clean Cities by fiscal year.

  4. Four Years of Leadership with Secretary Chu

    Broader source: Energy.gov [DOE]

    For more than four years, he has provided remarkable leadership in pursuing both President Obama’s nuclear security agenda as well as an all-of-the-above approach to energy that invests in clean...

  5. Ten Year Site Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the Department of Energy's overall strategic ...

  6. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved...

  7. Profiling 1366 Technologies: One Year Later

    Broader source: Energy.gov [DOE]

    Last January, we took a look at how ARPA-E performer, 1366 Technologies is working to dramatically reduce the cost of solar energy. A year later, we revisited their headquarters in Lexington, MA to...

  8. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure of TaAs. The results exhibit the features-cones, nodes, and arcs-that

  9. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure of TaAs. The results exhibit the features-cones, nodes, and arcs-that

  10. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure of TaAs. The results exhibit the features-cones, nodes, and arcs-that

  11. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure of TaAs. The results exhibit the features-cones, nodes, and arcs-that

  12. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure of TaAs. The results exhibit the features-cones, nodes, and arcs-that

  13. Weyl Fermions Discovered After 85 Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weyl Fermions Discovered After 85 Years Print An international team led by Princeton University scientists has discovered an elusive massless particle first theorized 85 years ago: the Weyl fermion. It was detected as an emergent quasiparticle in synthetic crystals of the semimetal, tantalum arsenide (TaAs). Using angle-resolved photoemission spectroscopy (ARPES), the researchers studied the surface and bulk band structure of TaAs. The results exhibit the features-cones, nodes, and arcs-that

  14. Multi-Year Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Year Schedule Multi-Year Schedule Table 2 presents DOE's currently scheduled rulemaking activities for energy conservation standards and test procedures. PDF icon multiyear_schedule_aug_2011.pdf More Documents & Publications 9th Semi-Annual Report to Congress on Appliance Energy Efficiency Rulemakings - Implementation Report: Energy Conservation Standards Activities 11th Semi-Annual Report to Congress on Appliance Energy Efficiency Rulemakings - Implementation Report: Energy Conservation

  15. Calendar Year 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Calendar Year 2012 December 21, 2012 Audit Report: OAS-L-13-03 The Management of the Plateau Remediation Contract December 21, 2012 Audit Report: IG-0879 Naval Reactors Information Technology System Development Efforts December 17, 2012 Audit Report: OAS-FS-13-08 Management Letter on the Audit of the Department of Energy's Consolidated Financial Statements for Fiscal Year 2012 December 11, 2012 Audit Report: IG-0878 Follow-up Audit of the Department's Cyber Security Incident Management Program

  16. LDRD Project Mid-Year Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics potential of polarized light ions with EIC@JLab Principal Investigator: C. Weiss (JLab Theory) Project Status Project work continued into FY15 with the same personnel as in FY14 (JLab investigators, 50% FTE postdoc shared with Old Dominion U., visitors). Following demonstration of feasibility of spectator tagging in the 1st project year, 2nd year efforts so far focused mainly on physics extraction, strengthening the theoretical framework, and outreach. Theory agenda and schedule had to

  17. NERSC's Names and Logos over the Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    names and logos over the years NERSC's Names and Logos over the Years April 16, 2014 by Francesca Verdier NERSC's name and logos have changed over the decades, reflecting the center's increasingly broad scientific mission. Founded in 1974 at Lawrence Livermore National Laboratory (LLNL) as the Controlled Thermonuclear Research Computer Center, NERSC has evolved from its early days supporting magnetic fusion research at LLNL to providing supercomputing resources across a spectrum of scientific

  18. Publications by Year | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publications by Year Publications by Year 2016 Adams NBP, Vasilev C, Brindley AA, and Hunter CN (2016) Nanomechanical and thermophoretic analyses of the nucleotide-dependent interactions between the AAA subunits of magnesium chelatase. Journal of the American Chemical Society. In press. Bandyopadhyay A, Elvitigala T, Liberton M, and Pakrasi HB (2016) Variations in the Rhythms of Respiration and Nitrogen Fixation in Members of the Unicellular Diazotrophic Cyanobacterial Genus Cyanothece. Plant

  19. Environmental releases for calendar year 1996

    SciTech Connect (OSTI)

    Greager, E.M.

    1997-07-31

    This report presents data on radioactive and nonradioactive materials released into the environment during calendar year 1996 from facilities and activities managed by the Fluor Daniel Hanford, Incorporated (formerly the Westinghouse Hanford Company) and Bechtel Hanford, Incorporated. Fluor Daniel Hanford, Incorporated provides effluent monitoring services for Bechtel Hanford, Incorporated, which includes release reporting. Both summary and detailed presentations of the environmental releases are provided. When appropriate, comparisons to data from previous years are made.

  20. Environmental releases for calendar year 1995

    SciTech Connect (OSTI)

    Diediker, L.P., Westinghouse Hanford

    1996-07-30

    This report presents data on radioactive and nonradioactive materials released into the environment during calendar year 1995 from facilities managed by the Westinghouse Hanford Company (WHC) and monitored by Bechtel Hanford, Incorporated (BHI). WHC provides effluent monitoring services for BHI, which includes release reporting. Both summary and detailed presentations of the environmental releases are provided. When appropriate,comparisons to data from previous years are made.

  1. Lab completes record year for environmental cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Record year for environmental cleanup Lab completes record year for environmental cleanup Personnel conducted more field investigations and cleanup campaigns than ever and completed a record number of Lab shipments to WIPP. December 16, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new

  2. 10 Years ON: From the Lab to the Real World in 10 Years | GE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Years ON: From the Lab to the Real World in 10 Years Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new ...

  3. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission and Distribution Programs. | Department of Energy Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development

  4. Waste management fiscal year 1998 progress report

    SciTech Connect (OSTI)

    1998-12-31

    The Waste Management Program is pleased to issue the Fiscal Year 1998 Progress Report presenting program highlights and major accomplishments of the last year. This year-end update describes the current initiatives in waste management and the progress DOE has made toward their goals and objectives, including the results of the waste management annual performance commitments. One of the most important program efforts continues to be opening the Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico, for the deep geologic disposal of transuranic waste. A major success was achieved this year by the West Valley Demonstration Project in New York, which in June completed the project`s production phase of high-level waste processing ahead of schedule and under budget. Another significant accomplishment this year was the award of two privatization contracts for major waste management operations, one at Oak ridge for transuranic waste treatment, and one at Hanford for the Tank Waste Remediation System privatization project. DOE is proud of the progress that has been made, and will continue to pursue program activities that allow it to safely and expeditiously dispose of radioactive and hazardous wastes across the complex, while reducing worker, public, and environmental risks.

  5. Hanford Tanks Initiative fiscal year 1997 retrieval technology demonstrations

    SciTech Connect (OSTI)

    Berglin, E.J.

    1998-02-05

    The Hanford Tanks Initiative was established in 1996 to address a range of retrieval and closure issues associated with radioactive and hazardous waste stored in Hanford`s single shell tanks (SSTs). One of HTI`s retrieval goals is to ``Successfully demonstrate technology(s) that provide expanded capabilities beyond past practice sluicing and are extensible to retrieve waste from other SSTS.`` Specifically, HTI is to address ``Alternative technologies to past practice sluicing`` ... that can ... ``successfully remove the hard heel from a sluiced tank or to remove waste from a leaking SST`` (HTI Mission Analysis). During fiscal year 1997, the project contracted with seven commercial vendor teams to demonstrate retrieval technologies using waste simulants. These tests were conducted in two series: three integrated tests (IT) were completed in January 1997, and four more comprehensive Alternative Technology Retrieval Demonstrations (ARTD) were completed in July 1997. The goal of this testing was to address issues to minimize the risk, uncertainties, and ultimately the overall cost of removing waste from the SSTS. Retrieval technologies can be separated into three tracks based on how the tools would be deployed in the tank: globally (e.g., sluicing) or using vehicles or robotic manipulators. Accordingly, the HTI tests included an advanced sluicer (Track 1: global systems), two different vehicles (Track 2: vehicle based systems), and three unique manipulators (Track 3: arm-based systems), each deploying a wide range of dislodging tools and conveyance systems. Each industry team produced a system description as envisioned for actual retrieval and a list of issues that could prevent using the described system; defined the tests to resolve the issues; performed the test; and reported the results, lessons learned, and state of issue resolution. These test reports are cited in this document, listed in the reference section, and summarized in the appendices. This report analyzes the retrieval testing issues and describes what has been learned and issues that need further resolution. As such, it can serve as a guide to additional testing that must be performed before the systems are used in-tank. The major issues discussed are tank access, deployment, mining strategy, waste retrieval, liquid scavenging (liquid usage), maneuverability, positioning, static and dynamic performance, remote operations, reliability, availability, maintenance, tank safety, and cost.

  6. Subsea completions: A record year in '93

    SciTech Connect (OSTI)

    Mohr, H.O. )

    1994-02-01

    Review of subsea completion statistics for 1993 shows 78 installations--an 18% increase over the previous all-time high of 66 installations during 1985. Risking some dramatics, the 78 installations during '93 represent a 73% increase over the 45 installations during '92. And enthusiasm and positive outlook for continued application of subsea completions is clearly indicated in all major areas of the offshore world. Data suggest that the activity should continue to rise strongly toward the year 2000. At the end of 1993, the number of future subsea completions identified for installation during the next 10 years is 1,315--up 15% from the 1,144 identified at year-end 1992. The next highest number identified was 1,083 at the end of 1989, supporting a positive trend.

  7. Year 2000 TWRS Maintenance procedure review report

    SciTech Connect (OSTI)

    ADAMS, M.R.

    1999-02-24

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K.

  8. After 5 Years, NERSC's Franklin Retires

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    After 15 Years, A New Top Earning Patent At Ames Lab After 15 Years, A New Top Earning Patent At Ames Lab January 20, 2012 - 11:32am Addthis Ames Laboratory senior metallurgist Iver Anderson explains the importance of lead-free solder in taking hazardous lead out of the environment by eliminating it from discarded computers and electronics that wind up in landfills. Anderson led a team that developed a tin-silver-copper replacement for traditional lead solder that has been adopted by more than

  9. Contract Periods of Performance Exceeding 5 Years

    Broader source: Energy.gov [DOE]

    Acquisition Letter 2010-5 has been revised to update references, make minor editorial changes, and clarify that the Director, Field Assistance and Oversight Division is the approval authority within Department of Energy for acquisition plans that contemplate a period of performance greater than 5 years.

  10. FISCAL YEAR 2014-2019 STRATEGIC PLAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Build & maintain an efficient & effective organization Hold recipients & overseers of Department funds accountable for actions that result in fraud, waste and/or abuse Provide independent, accurate, timely, and balanced information to the Department, Congress, and other key stakeholders FISCAL YEAR 2014-2019 STRATEGIC PLAN

  11. Capping blowouts from Iran's 8-year war

    SciTech Connect (OSTI)

    Sayers, B. )

    1991-07-01

    Control well blown up by the Iraqi military were a 2 1/2 year legacy left the National Iranian Oil Co. at the end of this long conflict. This final installment of a 2-part series describes capping of the largest wind oil well.

  12. Draft Multi-Year Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energys Building Technologies Office (BTO) has released its draft Multi-Year Program Plan (MYPP) for public comment. The draft MYPP provides a broad overview of buildings energy use and efficiency opportunities, and the strategies and goals of BTO to substantially accelerate the rate of efficiency improvements in both new and existing residential and commercial buildings.

  13. Profiling 1366 Technologies: One Year Later

    ScienceCinema (OSTI)

    Van Mierlo, Frank; Sachs, Ely;

    2013-05-29

    Last January, we took a look at how ARPA-E performer, 1366 Technologies is working to dramatically reduce the cost of solar energy. A year later, we revisited their headquarters in Lexington, MA to see the progress they've made.

  14. The first forty years, 1947-1987

    SciTech Connect (OSTI)

    Rowe, M.S.; Cohen, A.; Petersen, B.

    1987-01-01

    This report commemorates the fortieth anniversary of Brookhaven National Laboratory by representing a historical overview of research at the facility. The chapters of the report are entitled: The First Forty Years, Brookhaven: A National Resource, Fulfilling a Mission - Brookhaven's Mighty Machines, Marketing the Milestones in Basic Research, Meeting National Needs, Making a Difference in Everyday Life, and Looking Forward.

  15. Profiling 1366 Technologies: One Year Later

    SciTech Connect (OSTI)

    Van Mierlo, Frank; Sachs, Ely

    2011-01-01

    Last January, we took a look at how ARPA-E performer, 1366 Technologies is working to dramatically reduce the cost of solar energy. A year later, we revisited their headquarters in Lexington, MA to see the progress they've made.

  16. Mentor and Protege of the Year

    Broader source: Energy.gov [DOE]

    The DOE Mentor of the Year award recognizes the efforts of a DOE Mentor that has exceeded the requirements of their Mentor-Protégé agreement. These results have enhanced the protégé’s capabilities...

  17. Jefferson Lab Celebrates 2005: World Year of Physics | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    World Year of Physics Jefferson Lab Celebrates 2005: World Year of Physics January 24, 2005 Newport News, Va. - This year marks the 100th anniversary of Albert Einstein's ...

  18. 1999 Commercial Building Characteristics--Year Constructed Comparison

    U.S. Energy Information Administration (EIA) Indexed Site

    Year Constructed Comparison Percentage of Floorspace and Buildings by Year Constructed, 1999 Percentage of Floorspace and Buildings by Year Constructed, 1999. If having trouble...

  19. NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 An Act to authorize appropriations for fiscal year 2000 for military ...

  20. Webtrends Archives by Fiscal Year - Lose Your Excuse | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Webtrends Archives by Fiscal Year - Information Center Webtrends Archives by Fiscal Year - Calculators Webtrends Archives by Fiscal Year - Multimedia

  1. Fuel Cell Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multi-Year Research, Development and Demonstration Plan Page B - 1 Multi-Year Research, Development and Demonstration Plan Page B - 2 Multi-Year Research, Development and ...

  2. Bioenergy Technologies Office Fiscal Year 2014 Annual Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2014 Annual Report Bioenergy Technologies Office Fiscal Year 2014 Annual Report Bioenergy Technologies Office Fiscal Year 2014 Annual Report PDF icon ...

  3. Discomfort Glare: What Do We Actually Know?

    SciTech Connect (OSTI)

    Clear, Robert

    2012-02-29

    Glare models were reviewed with an eye for missing conditions or inconsistencies. We found ambiguities as to when to use small source versus large source models, and as to what constitutes a glare source in a complex scene. We also found surprisingly little information validating the assumed independence of the factors driving glare. A barrier to progress in glare research is the lack of a standardized dependent measure of glare. We inverted the glare models to predict luminance, and compared model predictions against the 1949 Luckiesh & Guth data that form the basis of many of them. The models perform surprisingly poorly, particularly with regards to the luminance-size relationship and additivity. Evaluating glare in complex scenes may require fundamental changes to form of the glare models.

  4. Natural Gas Multi-Year Program Plan

    SciTech Connect (OSTI)

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  5. Hydrogen program summary Fiscal Year 1994

    SciTech Connect (OSTI)

    Not Available

    1995-03-01

    The annual program summary provides stakeholders within the hydrogen community with a snapshop of important advances that have occurred in the National Hydrogen Program over the fiscal year, including industry interactions and cooperation. The document will also be used to encourage additional potential industrial partners to join the Hydrogen Program Team. Fiscal Year 1994 marked a turning point for the Hydrogen Program, with a budget that grew significantly. The focus of the program was broadened to include development of hydrogen production technologies using municipal solid waste and biomass, in addition to an increased emphasis on industrial involvement and near-term demonstration projects. In order to maintain its near- and long-term balance, the Hydrogen Program will continue with basic, fundamental research that provides the long-term, high-risk, high-payoff investment in hydrogen as an energy carrier.

  6. Wind Farms through the Years | Department of Energy

    Energy Savers [EERE]

    Wind Farms through the Years Wind Farms through the Years 1975 Start Slow Stop Year Wind Farms Homes Powered Added Current Year 833 Wind Farms Online. Enough to Power 15 M Homes...

  7. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Year-End Summary Report Long-Term Surveillance Operations and Maintenance Fiscal Year ... PDF icon Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End ...

  8. CALiPER Year in Review 2012

    SciTech Connect (OSTI)

    2012-12-10

    The CALiPER program has tested more than 500 products since its inception in 2006, revealing a variety of performance trends, holding manufacturers accountable for claims, and identifying concerns that limit adoption. Over the past six years, the LED marketplace has changed substantially; previously relegated to niche status, LED products are now a viable alternative in many product categories and market share is expected to grow rapidly. This document summarizes recent testing results and provides an overview of multiyear trends.

  9. Black Engineer of the Year Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Black Engineer of the Year Award - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  10. Calendar Year 1995 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Calendar Year 1995 December 1, 1995 Audit Report: IG-0381 Audit of Management and Operating Contractor Overtime Costs December 1, 1995 Audit Report: IG-0382 Audit of the Department of Energy's Site Safeguards and Security Plans November 24, 1995 Inspection Report: INS-O-96-02 Selected Concerns Regarding Property Accountability at the Continuous Electron Beam Accelerator Facility October 20, 1995 Audit Report: WR-B-96-04 Audit of Fuel Processing Restoration Property October 18, 1995 Audit

  11. Calendar Year 1997 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Calendar Year 1997 December 23, 1997 Audit Report: IG-0416 Audit of Support Services Subcontracts at Argonne National Laboratory December 10, 1997 Audit Report: ER-B-98-05 Audit Of The Department Of Energy's Contracts With Envirocare Of Utah, Inc December 5, 1997 Audit Report: IG-0414 Audit of the Department of Energy's Management of Field Contractor Employees Assigned to Headquarters and Other Federal Agencies December 4, 1997 Audit Report: IG-0415 Audit of Departmental Receipt of Final

  12. Calendar Year 1998 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Calendar Year 1998 December 21, 1998 Audit Report: ER-B-99-01 Decontamination and Decommissioning at the East Tennessee Technology Park December 18, 1998 Audit Report: IG-0434 Waste Inventory Data at Oak Ridge and Savannah River December 4, 1998 Audit Report: WR-B-99-01 Transportation Safeguards Division Courier Work Schedules and Escort Vehicle Replacements December 3, 1998 Inspection Report: IG-0433 Inspection of Department of Energy's Conference Policies and Practices November 20, 1998

  13. Calendar Year 1999 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Calendar Year 1999 December 22, 1999 Inspection Report: IG-0455 Inspection of the Sale of a Paragon Supercomputer by Sandia National Laboratories December 16, 1999 Inspection Report: INS-O-00-02 Inspection of Alleged Improprieties Regarding Issuance of a Contract December 15, 1999 Audit Report: IG-0454 Waste Incineration at the Idaho National Engineering and Environmental Laboratory December 10, 1999 Audit Report: WR-B-00-02 Property and Facilities at Grand Junction December 1, 1999 Inspection

  14. Calendar Year 2000 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Calendar Year 2000 November 28, 2000 Special Report: IG-0491 Management Challenges at the Department of Energy November 28, 2000 Audit Report: IG-0489 Americium/Curium Vitrification Project At The Savannah River Site November 28, 2000 Audit Report: IG-0490 Containers Suitable for Shipping Fissile Material November 20, 2000 Inspection Report: IG-0488 Inspection of Selected Aspects of the Department of Energy's Classified Document Transmittal Process November 6, 2000 Inspection Report:

  15. Calendar Year 2001 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Calendar Year 2001 December 21, 2001 Special Report: IG-0538 Management Challenges at the Department of Energy December 21, 2001 Audit Report: IG-0537 Telecommunications Infrastructure December 20, 2001 Inspection Report: IG-0536 Follow-on Inspection of the Department of Energy's Value Engineering Program December 18, 2001 Audit Report: IG-0535 Management of the Stockpile Surveillance Program's Significant Finding Investigations December 7, 2001 Inspection Report: IG-0533 Inspection of the

  16. Calendar Year 2002 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Calendar Year 2002 December 31, 2002 Special Report: IG-0580 Management Challenges at the Department of Energy December 23, 2002 Audit Report: IG-0579 The Department's Unclassified Foreign Visits and Assignments Program December 19, 2002 Inspection Report: IG-0578 Inspection of Explosives Safety at Selected Department of Energy Sites December 18, 2002 Audit Report: IG-0577 Planned Characterization Capability At The Waste Isolation Pilot Plant December 5, 2002 Audit Report: OAS-L-03-04

  17. Calendar Year 2003 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Calendar Year 2003 December 22, 2003 Audit Report: IG-0634 Cold Standby Program at the Portsmouth Gaseous Diffusion Plant December 18, 2003 Inspection Report: IG-0633 This inspection report is classified and is available for review by appropriately cleared personnel with a need to know December 18, 2003 Inspection Report: IG-0633 The Security of Uranium Hexafluoride at the East Tennessee Technology Park December 16, 2003 Audit Report: IG-0632 Modernization of Tritium Requirements Systems

  18. After seven years, where's the consensus

    SciTech Connect (OSTI)

    Norman, M.R.

    1993-04-01

    It has been 7 years since the discovery of copper oxide superconductors, yet there is no consensus on the correct theory for this phenomenon. The theory can be divided into 3 groups: ordinary (phonons), exotic (AF spin fluctuations, nested Fermi liquid, excitons, spin bags, odd frequency pairing), and revolutionary (Luttinger liquid, spin-charge separation, gauge theories, anyons, marginal Fermi liquid). C-axis dispersion, dHvA, and magneto-oscillations are also discussed.

  19. NERSC: 40 YEARS AT THE FOREFRONT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CALENDAR CSO 0019 NERSC: 40 YEARS AT THE FOREFRONT In 1974, an almost-obsolete supercomputer once used for defense research was made available to support the fusion energy research community, the first time such a powerful computing resource was used for unclassified scientific computing. That start as the Controlled Thermonuclear Research Computer Center marked the launch of what today is known as the National Energy Research Scientific Computing Center at Lawrence Berkeley National Laboratory

  20. RL's Fiscal Year 2013 Fee Evaluation Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RL's Fiscal Year 2013 Fee Evaluation Summary Contractor: HPM Corporation (HPMC) Contract: Occupational Medical Services at DOE Hanford Contract Number: DE-EM0002043 Award Period: October 2012 through September 2013 Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $300,000.00 Award Fee Earned: $284,250.00 Award Fee Area Adjectival Ratings: Performance Incentive Adjectival Rating Allocated Percent Earned Percent Amount Available Amount Earned 1.0: Worker

  1. RL's Fiscal Year 2013 Fee Evaluation Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RL's Fiscal Year 2013 Fee Evaluation Summary Contractor: Mission Support Alliance, LLC (MSA) Contract: Mission Support Contract Contract Number: DE-AC06-09RL14728 Award Period: October 2012 through September 2013 Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $21,030,647 Award Fee Earned: $19,352,402 (92%) Award Fee Area Adjectival Ratings: Objective: Excellent (96%) $12,117,859 Subjective: Very Good (86%) $7,234,543 The contractor met or exceeded

  2. Year 2 Report: Protein Function Prediction Platform

    SciTech Connect (OSTI)

    Zhou, C E

    2012-04-27

    Upon completion of our second year of development in a 3-year development cycle, we have completed a prototype protein structure-function annotation and function prediction system: Protein Function Prediction (PFP) platform (v.0.5). We have met our milestones for Years 1 and 2 and are positioned to continue development in completion of our original statement of work, or a reasonable modification thereof, in service to DTRA Programs involved in diagnostics and medical countermeasures research and development. The PFP platform is a multi-scale computational modeling system for protein structure-function annotation and function prediction. As of this writing, PFP is the only existing fully automated, high-throughput, multi-scale modeling, whole-proteome annotation platform, and represents a significant advance in the field of genome annotation (Fig. 1). PFP modules perform protein functional annotations at the sequence, systems biology, protein structure, and atomistic levels of biological complexity (Fig. 2). Because these approaches provide orthogonal means of characterizing proteins and suggesting protein function, PFP processing maximizes the protein functional information that can currently be gained by computational means. Comprehensive annotation of pathogen genomes is essential for bio-defense applications in pathogen characterization, threat assessment, and medical countermeasure design and development in that it can short-cut the time and effort required to select and characterize protein biomarkers.

  3. Oak Ridge Environmental Management: 30 years in 30 minutes |...

    Office of Environmental Management (EM)

    Oak Ridge Environmental Management: 30 years in 30 minutes Oak Ridge Environmental Management: 30 years in 30 minutes Addthis

  4. Financial analysis of experimental releases conducted at Glen Canyon Dam during water year 2011

    SciTech Connect (OSTI)

    Poch, L. A.; Veselka, T. D.; Palmer, C. S.; Loftin, S.; Osiek, B.

    2012-07-16

    This report examines the financial implications of experimental flows conducted at the Glen Canyon Dam (GCD) in water year 2011. It is the third report in a series examining financial implications of experimental flows conducted since the Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). A report released in January 2011 examined water years 1997 to 2005 (Veselka et al. 2011), and a report released in August 2011 examined water years 2006 to 2010 (Poch et al. 2011). An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes both that operations comply with the ROD operating criteria and the experimental releases that actually took place during the study period, and (2) a 'without experiments' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP powerplant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases, the GTMax model was also used to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and Western operating practices. Experimental releases conducted in water year 2011 resulted only in financial costs; the total cost of all experimental releases was about $622,000.

  5. Tennessee health studies agreement. Annual report for year 4, January 1--December 31, 1995

    SciTech Connect (OSTI)

    1996-04-01

    The Tennessee Department of Health (TDH) has completed the fourth full year of the Oak Ridge Health Studies Agreement grant. This report summarizes the accomplishments and concerns of the State for the period January 1, 1995, to December 31, 1995. The focus of work during the fourth grant year was the actual work on the dose reconstruction. The final work plan for Task 5, Plan to Perform a Systematic Document Search was received in November 1994. Final work plans for Task 1, Investigation of Radioiodine from Radioactive Lanthanum Processing; Task 2, Investigation of Mercury Releases from Lithium Enrichment; Task 3, Investigation of Releases of PCBs from Oak Ridge Facilities; and Task 4, Investigation of Releases of Radionuclides from White Oak Creek to the Clinch River, were received in February 1995. Final work plans for Task 6, Investigation of the Quality of Historical Uranium Effluent Monitoring at Oak Ridge Facilities; and Task 7, Additional Screening of Materials Not Evaluated in the Dose Reconstruction Feasibility Study, were received in April 1995. ChemRisk`s 4th Quarterly Report, for October through December 1995, is included in Attachment 1. Attachment 2 contains a study which developed a quality improvement program for data imported to the Tennessee Cancer Reporting System and Birth Defects Verification Program.

  6. Idaho National Engineering and Environmental Laboratory radiological control performance indicator report. Third quarter, calendar year 1997

    SciTech Connect (OSTI)

    1997-11-01

    This document provides a report and analysis of the Radiological Control Program through the third quarter of calendar year 1997 (CY-97) at the Idaho National Engineering and Environmental Laboratory (INEEL) under the direction of Lockheed Martin Idaho Technologies Company (LMITCO). This Performance Indicator Report is provided in accordance with Article 133 of the INEEL Radiological Control Manual. The INEEL collective occupational radiation exposure goal (deep dose) has been revised from 137 person-rem to 102.465 person-rem. Aggressive application of ALARA protective measures has resulted in a 66.834 person-rem deep dose compared to projected third quarter goal of 85.5 person-rem. Dose savings at the ICPP Tank Farm and rescheduling of some of the ROVER work account for most of the difference in the goal and actual dose year to date. Work at the ICPP Tank farm has resulted in about 14 rem dose savings. The RWMC has also reduced exposure by moving waste to new temporary storage facilities well ahead of schedule.

  7. Year End Progress Report on Rattlesnake Improvements

    SciTech Connect (OSTI)

    Wang, Yaqi; DeHart, Mark David; Gleicher, Frederick Nathan; Ortensi, Javier; Schunert, Sebastian

    2015-09-01

    Rattlesnake is a MOOSE-based radiation transport application developed at INL to support modern multi-physics simulations. At the beginning of the last year, Rattlesnake has been able to perform steady-state, transient and eigenvalue calculations for the multigroup radiation transport equations. Various discretization schemes, including continuous finite element method (FEM) with discrete ordinates method (SN) and spherical harmonics expansion method (PN) for the self-adjoint angular flux (SAAF) formulation, continuous FEM (CFEM) with SN for the least square (LS) formulation, diffusion approximation with CFEM and discontinuous FEM (DFEM), have been implemented. A separate toolkit, YAKXS, for multigroup cross section management was developed to support Rattlesnake calculations with feedback both from changes in the field variables, such as fuel temperature, coolant density, and etc., and in isotope inventory. The framework for doing nonlinear diffusion acceleration (NDA) within Rattlesnake has been set up and both NDA calculations with SAAF-SN-CFEM scheme and Monte Carlo with OpenMC have been performed. It was also used for coupling BISON and RELAP-7 for the full-core multiphysics simulations. Within the last fiscal year, significant improvements have been made in Rattlesnake. Rattlesnake development was migrated into our internal GITLAB development environment at the end of year 2014. Since then total 369 merge requests has been accepted into Rattlesnake. It is noted that the MOOSE framework that Rattlesnake is based on is under continuous developments. Improvements made in MOOSE can improve the Rattlesnake. It is acknowledged that MOOSE developers spent efforts on patching Rattlesnake for the improvements made on the framework side. This report will not cover the code restructuring for better readability and modularity and documentation improvements, which we have spent tremendous effort on. It only details some of improvements in the following sections.

  8. HUMAN RADIATION STUDIES: REMEMBERING THE EARLY YEARS

    Office of Scientific and Technical Information (OSTI)

    DOBEH -0454 HUMAN RADIATION STUDIES: REMEMBERING THE EARLY YEARS Oral History of Dr. George Voelz, M.D. Conducted November 29,1994 United States Department of Energy Office of Human Radiation Experiments May I995 OlSTRiBUTLON OF THIS DOCUMENT is UMLIMtTEB FOREWORD N DECEMBER 1993, U.S. Secretary of Energy Hazel R. O'Leary announced her Openness Initiative. As part of this initiative, the Department of Energy I undertook an effort to identie and catalog historical documents on radiation

  9. Calendar Year 2005 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Calendar Year 2005 December 30, 2005 Audit Report: OAS-M-06-03 Management Controls over the University of California's Contributions to the Los Alamos National Laboratory Foundation December 21, 2005 Audit Report: IG-0713 Status of the Mixed Oxide Fuel Fabrication Facility December 20, 2005 Audit Report: OAS-L-06-04 Federal Managers' Financial Integrity Act December 20, 2005 Audit Report: OAS-L-06-03 Defense Waste Processing Facility Operations at the Savannah River Site December 14, 2005

  10. Calendar Year 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Calendar Year 2011 December 21, 2011 Inspection Report: INS-L-12-01 Follow-up Review of Control and Accountability of Emergency Communication Network Equipment December 16, 2011 Inspection Report: INS-RA-L-12-01 Waste Disposal and Recovery Act Efforts at the Oak Ridge Reservation November 28, 2011 Special Report: OAS-RA-L-12-01 Special Inquiry on the Office of the Chief Financial Officer's Information Technology Expenditures November 15, 2011 Evaluation Report: OAS-M-12-01 The Federal Energy

  11. Calendar Year 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Calendar Year 2015 December 22, 2015 Inspection Report: OAI-L-16-06 Worker Safety and Health at the Y-12 National Security Complex December 18, 2015 Audit Report: DOE-OIG-16-05 The National Nuclear Security Administration's Network Vision Initiative December 18, 2015 Audit Report: OAI-M-16-03 The Office of Fossil Energy's Regional Carbon Sequestration Partnerships Initiative December 15, 2015 Audit Report: OAI-L-16-05 Lithium Operations at the Y-12 National Security Complex December 7, 2015

  12. Long-Term Surveillance Operations and Maintenance Fiscal Year 2014 Year-End

    Energy Savers [EERE]

    Summary Report | Department of Energy 4 Year-End Summary Report Long-Term Surveillance Operations and Maintenance Fiscal Year 2014 Year-End Summary Report The Long-Term Surveillance Operations and Maintenance (LTS-O&M) subtask has a critical long-term surveillance and maintenance (LTS&M) role for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). LM needs knowledge and tools to ensure that implementation of LTS&M will be informed, efficient, and cost-effective.

  13. Environmental Releases for Calendar Year 2001

    SciTech Connect (OSTI)

    DYEKMAN, D L

    2002-08-01

    This report fulfills the annual reporting requirements of US Department of Energy (DOE) Order 5400.1, General Environmental Protection Program. The report contains tabular data summaries on air emissions and liquid effluents released to the environment as well as nonroutine releases during calendar year (CY) 2001. These releases, bearing radioactive and hazardous substances, were from Bechtel Hanford, Inc. (BHI), CH2M HILL Hanford Group, Inc. (CHG), and Fluor Hanford (FH) managed facilities and activities. These data were obtained from direct sampling and analysis and from estimates based upon approved release factors. This report further serves as a supplemental resource to the Hanford Site Environmental Report (HSER PNNL-13910), published by the Pacific Northwest National Laboratory. HSER includes a yearly accounting of the impacts on the surrounding populace and environment from major activities at the Hanford Site. HSER also summarizes the regulatory compliance status of the Hanford Site. Tables ES-1 through ES-5 display comprehensive data summaries of CY2001 air emission and liquid effluent releases. The data displayed in these tables compiles the following: Radionuclide air emissions; Nonradioactive air emissions; Radionuclides in liquid effluents discharged to ground; Total volumes and flow rates of radioactive liquid effluents discharged to ground; and Radionuclides discharged to the Columbia River.

  14. A System Degradation Study of 445 Systems Using Year-Over-Year Performance Index Analysis

    Broader source: Energy.gov [DOE]

    This graphic summarizes the results of a study conducted by the SunPower Corporation, to assess the median degradation of a large number of systems. This is important because solar investors need proof of low degradation. The study, a project under DOE's SunShot Initiative, makes use of year-over-year performance index change analysis, a powerful and practical technique for assessing the median degradation of a large fleet of systems, which in this case includes a sample of 445.

  15. ,"Month","Year","Contiguous U.S.","Eastern Power Grid",,,,,,,,"Texas Power Grid","Western Power Grid"

    U.S. Energy Information Administration (EIA) Indexed Site

    " ","Next Update: October 2007" ,"Table 3a. January Monthly Peak Hour Demand, Actual by North American Electric Reliability Council Region, 1996 through 2004 " ,"(Megawatts)" ,"Month","Year","Contiguous U.S.","Eastern Power Grid",,,,,,,,"Texas Power Grid","Western Power Grid"

  16. Year Global Normal Irradiance Direct Normal Irradiance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Year Global Normal Irradiance Direct Normal Irradiance (TMY3 = 6.7) Global Horizontal Irradiance** (TMY3 = 5.43) Latitude Tilt Irradiance** Diffuse Horizontal Irradiance (TMY3 = 1.46) Peak GNI (1-hr avg) Peak DNI (1-hr avg) Peak GHI (1-hr avg) Peak Lat.Tilt (1-hr avg) TMY2 8.8 6.7 5.6 6.4 1.6 - - - - 2015 8.26 6.58 5.29 6.07 1.34 1167 1067 1090 1208 2014 8.85 7.10 5.54 6.40 1.28 1176 1083 1098 1196 2013 8.82 7.23 5.59 6.63 1.24 1192 1076 1093 1182 2012 9.17 7.41 5.69 6.65 1.21 1177 1080 1091

  17. Reminiscing about 15 years of interoperability efforts

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Van de Sompel, Herbert; Nelson, Michael L.

    2015-11-01

    Over the past fifteen years, our perspective on tackling information interoperability problems for web-based scholarship has evolved significantly. In this opinion piece, we look back at three efforts that we have been involved in that aptly illustrate this evolution: OAI-PMH, OAI-ORE, and Memento. Understanding that no interoperability specification is neutral, we attempt to characterize the perspectives and technical toolkits that provided the basis for these endeavors. With that regard, we consider repository-centric and web-centric interoperability perspectives, and the use of a Linked Data or a REST/HATEAOS technology stack, respectively. In addition, we lament the lack of interoperability across nodes thatmore » play a role in web-based scholarship, but end on a constructive note with some ideas regarding a possible path forward.« less

  18. Reminiscing about 15 years of interoperability efforts

    SciTech Connect (OSTI)

    Van de Sompel, Herbert; Nelson, Michael L.

    2015-11-01

    Over the past fifteen years, our perspective on tackling information interoperability problems for web-based scholarship has evolved significantly. In this opinion piece, we look back at three efforts that we have been involved in that aptly illustrate this evolution: OAI-PMH, OAI-ORE, and Memento. Understanding that no interoperability specification is neutral, we attempt to characterize the perspectives and technical toolkits that provided the basis for these endeavors. With that regard, we consider repository-centric and web-centric interoperability perspectives, and the use of a Linked Data or a REST/HATEAOS technology stack, respectively. In addition, we lament the lack of interoperability across nodes that play a role in web-based scholarship, but end on a constructive note with some ideas regarding a possible path forward.

  19. Consolidated financial statements for fiscal year 1996

    SciTech Connect (OSTI)

    1997-02-01

    The following overview and accompanying audited financial statements have been prepared for Fiscal Year (FY) 1996 to report the financial position and the results of operations of the Department of Energy. These statements include the consolidated Statement of Financial Position and the consolidated Statement of Operations and Changes in Net Position. The statements have been prepared in accordance with the Office of Management and Budget Bulletin No. 94-01, Form and Content for Agency Financial Statements, and were developed in accordance with the hierarchy of accounting standards described therein. The overview provides a narrative on the Department of Energy`s mission, activities, and accomplishments. Utilizing performance measures as the primary vehicle for communicating Departmental accomplishments and results, this overview discusses the most significant measures while others are discussed in the supplemental information to the financial statements.

  20. 10 Years after the 2003 Northeast Blackout

    Broader source: Energy.gov [DOE]

    Ten years ago today, large portions of the Midwest and Northeast United States and into Canada went dark. The cascading event, which started shortly after 4:00 PM on August 14, 2003, ended up affecting an estimated 50 million people. For some customers, power was not restored for nearly four days. The Department of Energy and Natural Resources Canada jointly commissioned a task force that examined the underlying causes of the blackout and recommended forty-six actions to enhance the reliability of the North American power system. A number of the recommendations were incorporated into law passed by Congress and enacted in the Energy Policy Act of 2005 and the Energy Infrastructure Security Act of 2007.

  1. Coal cars - the first three hundred years

    SciTech Connect (OSTI)

    Martin Robert Karig III

    2007-12-15

    This is the comprehensive study of the freight cars that conveyed coal across broad swaths of land that had been impassible before the invention of the steam engine. This volume traces the history and evolution of coal cars from their earliest use in England to the construction of major railways for the purpose of coal hauling and the end of the steam era on American railroads. In addition to contextualizing coal cars in the annals of industrial history, the book features extensive design specifications and drawings as well as a complete history of the various safety and mechanical innovations employed on these freight cars. It concludes with a photographic essay illustrating the development of the coal car over its first 300 years of use. 608 photos.

  2. Environmental releases for calendar year 1994

    SciTech Connect (OSTI)

    Gleckler, B.P.

    1995-07-01

    This report fulfills the annual environmental release reporting requirements of US Department of Energy (DOE) Orders. This report provides supplemental information to the Hanford Site Environmental Report. The Hanford Site Environmental Report provides an update on the environmental status of the entire Hanford Site. The sitewide annual report summarizes the degree of compliance of the Hanford Site with applicable environmental regulations and informs the public about the impact of Hanford operations on the surrounding environment. Like the Hanford Site Environmental Report, this annual report presents a summary of the environmental releases from facilities managed by the Westinghouse Hanford Company (WHC) and monitored by Bechtel Hanford, Incorporated (BHI). In addition to the summary data, this report also includes detailed data on air emissions, liquid effluents, and hazardous substances released to the environment during calendar year 1994 from these facilities.

  3. Environmental monitoring report for Calendar Year 1986

    SciTech Connect (OSTI)

    Stencel, J.R.

    1987-05-01

    The results of the 1986 environmental monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. Two of three large tokamak machines, the Princeton Large Torus (PLT) and the Tokamak Fusion Test Reactor (TFTR) were in operation during the year. The Princeton Beta Experiment (PBX) was shut down in December 1985 to undergo major modifications, and will recommence operations in 1987. PLT was shut down in December 1986. In addition, the S-1 Spheromak and the Radio-Frequency Test Facility (RFTF) were operated on a limited basis in 1986. The Environmental Committee became a standing committee of the Executive Safety Board (ESB) and continued to review items of environmental importance. During CY86 no adverse effects to the environment or public resulted from any operational program activities at PPPL, and the Laboratory was in compliance with all applicable federal, state, and local environmental regulations.

  4. Environmental report for calendar year 1989

    SciTech Connect (OSTI)

    Stencel, J.R.; Turrin, R.P.

    1991-03-01

    This report gives the results of the environmental activities and monitoring programs at the Princeton Plasma Physics Laboratory (PPPL) for Calendar Year 1989 (CY89). The report is prepared to provide the US Department of Energy (DOE) and the public with information on the level of radioactive and nonradioactive pollutants, if any, added to the environment as a result of PPPL operations. The objective of the environmental report is to document evidence that DOE facility environmental protection programs adequately protect the environment and the public health. During CY89, there were no accidents, incidents, or occurrences that had a significant impact on PPPL facilities or program operations. The accidental overfilling of an underground storage tank (UST) during 1988, along with the discovery of residual hydrocarbons in the soil of an area used for unloading fuel oil trucks over the last 30 years, has the potential for a minor environmental impact and has resulted in a costly clean up in this area. Surface water analyses for both radioactive and nonradioactive pollutants have shown nothing above normally expected background values. Ambient tritium levels at less than 100 pCi/liter (3.7 Bq/liter) were measured in D-site well water. New groundwater monitoring wells were added in 1989 as a requirement for the groundwater part of our New Jersey Pollutant Discharge Elimination System (NJPDES) permit. Initial sampling of these wells indicated the presence of lead in two shallow wells next to the detention basin. Radiation exposure via airborne effluents into the environment is still at insignificant levels; however, a stack monitor for tritium is planned for 1990 to ensure compliance with new EPA regulations. Off-site surface water, soils, and biota continued to be analyzed for radioactive baselines in CY89. 51 refs., 27 figs., 40 tabs.

  5. Webtrends Archives by Fiscal Year - Calculators | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Calculators Webtrends Archives by Fiscal Year - Calculators From the EERE Web Statistics Archive: Corporate sites, Webtrends archive for the Calculators site for fiscal year 2011. Microsoft Office document icon Calculators FY11 More Documents & Publications Webtrends Archives by Fiscal Year - Office of EERE Webtrends Archives by Fiscal Year - Information Center Webtrends Archives by Fiscal Year - Kids Site

  6. Webtrends Archives by Fiscal Year - Multimedia | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multimedia Webtrends Archives by Fiscal Year - Multimedia From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Multimedia site for fiscal year 2011. Microsoft Office document icon Multimedia FY11 More Documents & Publications Webtrends Archives by Fiscal Year - Energy Basics Webtrends Archives by Fiscal Year - Kids Site Webtrends Archives by Fiscal Year - Office of EERE

  7. Three-year Rolling Timeline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Three-year Rolling Timeline Three-year Rolling Timeline PDF icon SIGNED=Melendez_FY13 Three Year Rolling Timeline_Update_Final.pdf More Documents & Publications Three Year Rolling Timeline FY2012 Three Year Rolling Timeline The Department&#8217;s real property assets are vital to the accomplishment of its mission

  8. Weldon Spring Site environmental report for calendar year 1993. Weldon Springs Site Remedial Action Project

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This Site Environmental Report for Calendar Year 1993 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels, and to summarize trends and/or changes in contaminant concentrations from environmental monitoring program. In 1993, the maximum committed dose to a hypothetical individual at the chemical plant site perimeter was 0.03 mrem (0.0003 mSv). The maximum committed dose to a hypothetical individual at the boundary of the Weldon Spring Quarry was 1.9 mrem (0.019 mSv). These scenarios assume an individual walking along the perimeter of the site-once a day at the chemical plant/raffinate pits and twice a day at the quarry-250 days per year. This hypothetical individual also consumes fish, sediment, and water from lakes and other bodies of water in the area. The collective dose, based on an effected population of 112,000 was 0.12 person-rem (0.0012 person-Sv). This calculation is based on recreational use of the August A. Busch Memorial Conservation Area and the Missouri Department of Conservation recreational trail (the Katy Trail) near the quarry. These estimates are below the U.S. Department of Energy requirement of 100 mrem (I mSv) annual committed effective dose equivalent for all exposure pathways. Results from air monitoring for the National Emission Standards for Hazardous Air Pollutants (NESHAPs) program indicated that the estimated dose was 0.38 mrem, which is below the U.S. Environmental Protection Agency (EPA) standard of 10 mrem per year.

  9. ARM - Research Support for International Polar Year (IPY)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Polar YearResearch Support for International Polar Year (IPY) Research Support International Polar Year Begins at ACRF with 3-week Campaign in Barrow Aerosol Affects on Clouds To...

  10. Sandia Energy - CSP Mid-Year FY12 AOP Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CSP Mid-Year FY12 AOP Review Home Renewable Energy Energy News Concentrating Solar Power Solar CSP Mid-Year FY12 AOP Review Previous Next CSP Mid-Year FY12 AOP Review Sandia held...

  11. Property:Building/YearConstruction2 | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search This is a property of type Date. Year of construction 2 (Year of construction) Pages using the property "BuildingYearConstruction2" Showing 25 pages using...

  12. EM-LA Fiscal Year 2016 Budget | Department of Energy

    Office of Environmental Management (EM)

    EM-LA Fiscal Year 2016 Budget EM-LA Fiscal Year 2016 Budget Topic: Presentation on the Los Alamos Environmental Management Field Office Budget for Fiscal Year 2016. PDF icon FY-16 Budget - January 27,

  13. Annual Site Environmental Report Calendar Year 2010

    SciTech Connect (OSTI)

    Kayser, Dan

    2011-01-31

    This report summarizes the environmental status of Ames Laboratory for calendar year 2010. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. In 2010, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local regulations and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2010. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2010. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2010. Included in these efforts were battery and CRT recycling, miscellaneous electronic office equipment, waste white paper and green computer paper-recycling and corrugated cardboard recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, foamed polystyrene peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Performance Evaluation Measurement Plan, on its Affirmative Procurement Performance Measure. A performance level of 'A-' was achieved in 2010 for Integrated Safety, Health and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System (EMS) has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts. The Laboratory's EMS was audited in April 2009 by DOE-CH. There were four 'Sufficiently in Conformity' findings as a result of the audit. All four findings were tracked in the Laboratory's corrective action database for completion. Beryllium was used routinely at Ames Laboratory in the 1940's and 1950's in processes developed for the production of highly pure uranium and thorium in support of the historic Manhattan Project. Laboratory metallurgists also worked on a process to produce pure beryllium metal from beryllium fluoride. In the early 1950's, beryllium oxide powder was used to produce shaped beryllium and crucibles. As a result of that work, beryllium contamination now exists in many interstitial spaces (e.g., utility chases) and ventilation systems in Wilhelm, Spedding and Metals Development buildings. Extensive characterization and remediation efforts have occurred in 2009 and 2010 in order to better understand the extent of the contamination. Analysis of extensive sampling data suggests that a fairly wide dispersion of beryllium occurred (most likely in the 1950's and 60's) in Wilhelm Hall and in certain areas of Spedding Hall and Metals Development. Area air-sampling results and work-area surface characterizations indicate the exposure potential to current workers, building visitors and the public remains extremely low. This information is now used to guide cleaning efforts and to provide worker protection during remodeling and maintenance activities. Results were shared with the DOE's Former Worker Program to support former worker medical test

  14. Environmental Justice Five-Year Implementation Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Environmental Justice » Environmental Justice Five-Year Implementation Plan Environmental Justice Five-Year Implementation Plan Environmental Justice Five-Year Implementation Plan (December 2008) PDF icon Environmental Justice Five-Year Implementation Plan (December 2008) More Documents & Publications Environmental Justice Five-Year Implementation Plan - First Annual Progress Report Environmental Justice Strategy Environmental Justice Five-Year Implementation Plan - Second

  15. Photovoltaic energy: Program overview, fiscal year 1990

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    This summary is prepared each year to provide an overview of the government-funded activities within the National Photovoltaics Program. The 1990 PV Program Achievements are listed. Launched the PV Manufacturing Technology initiative, designed to systematically lower PV module costs. Inaugurated the PV Concentrator Technologies Initiative by signing eight multiyear, cost-shared technology development subcontracts with concentrator companies. Established the PV Polycrystalline Thin-Film Initiative by signing six multiyear, cost-shared technology development subcontracts with six polycrystalline thin-film companies. Continued the Amorphous Silicon Project by awarding three new research and development contracts. Focused the resources of three program laboratories on finding solutions to industry's manufacturing problems: the Photovoltaic Device Fabrication Laboratory at Sandia National Laboratories and the Module Failure Analysis Laboratory and the Encapsulant Research Laboratory at SERI. Established an ongoing program to assist utilities in using PV for cost-effective, high-value applications. Completed nearly all of the construction planned for the first phase of PVUSA at Davis, California. Worked with the crystalline silicon PV industry on novel, low-cost cell fabrication processes and on resolving encapsulant problems. Took part in the development of qualification procedures tests for thin- and thick-film flat-plate modules and concentrator modules.

  16. PHENIX: Beyond 15 years of discovery

    SciTech Connect (OSTI)

    Morrison, David; Nagle, James L.

    2015-01-12

    The PHENIX experiment at BNL’s Relativistic Heavy Ion Collider (RHIC) was designed to uncover properties of the quark–gluon plasma (QGP) via rare penetrating probes. Over the past 15 years, the collaboration has delivered on its promised measurements, often with exciting results beyond those originally foreseen. That the QGP behaves as a nearly perfect fluid and that non-photonic electrons are substantially suppressed has led to the use of heavy quarks as probes of the medium. The PHENIX silicon vertex detectors are opening a new arena for QGP studies, and the MPC-EX, a novel forward calorimeter with silicon readout, accesses low-x physics via direct photons with unprecedented precision. PHENIX has proposed sPHENIX, a major upgrade using the recently acquired BaBar solenoid and full calorimetric coverage and high rate capabilities. sPHENIX will reconstruct jets and extend observables to higher transverse momentum, where comparisons to results from the Large Hadron Collider (LHC) heavy-ion program will provide the most insightful. Following the RHIC program, the nuclear physics community has identified an electron ion collider (EIC) as crucial to the next generation of QCD investigations. The BaBar magnet and sPHENIX calorimetry will be an excellent foundation for a new collaborative pursuit of discovery.

  17. PHENIX: Beyond 15 years of discovery

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Morrison, David; Nagle, James L.

    2015-01-12

    The PHENIX experiment at BNL’s Relativistic Heavy Ion Collider (RHIC) was designed to uncover properties of the quark–gluon plasma (QGP) via rare penetrating probes. Over the past 15 years, the collaboration has delivered on its promised measurements, often with exciting results beyond those originally foreseen. That the QGP behaves as a nearly perfect fluid and that non-photonic electrons are substantially suppressed has led to the use of heavy quarks as probes of the medium. The PHENIX silicon vertex detectors are opening a new arena for QGP studies, and the MPC-EX, a novel forward calorimeter with silicon readout, accesses low-x physicsmore » via direct photons with unprecedented precision. PHENIX has proposed sPHENIX, a major upgrade using the recently acquired BaBar solenoid and full calorimetric coverage and high rate capabilities. sPHENIX will reconstruct jets and extend observables to higher transverse momentum, where comparisons to results from the Large Hadron Collider (LHC) heavy-ion program will provide the most insightful. Following the RHIC program, the nuclear physics community has identified an electron ion collider (EIC) as crucial to the next generation of QCD investigations. The BaBar magnet and sPHENIX calorimetry will be an excellent foundation for a new collaborative pursuit of discovery.« less

  18. Water resources data, Kentucky. Water year 1991

    SciTech Connect (OSTI)

    McClain, D.L.; Byrd, F.D.; Brown, A.C.

    1991-12-31

    Water resources data for the 1991 water year for Kentucky consist of records of stage, discharge, and water quality of streams and lakes; and water-levels of wells. This report includes daily discharge records for 115 stream-gaging stations. It also includes water-quality data for 38 stations sampled at regular intervals. Also published are 13 daily temperature and 8 specific conductance records, and 85 miscellaneous temperature and specific conductance determinations for the gaging stations. Suspended-sediment data for 12 stations (of which 5 are daily) are also published. Ground-water levels are published for 23 recording and 117 partial sites. Precipitation data at a regular interval is published for 1 site. Additional water data were collected at various sites not involved in the systematic data-collection program and are published as miscellaneous measurement and analyses. These data represent that part of the National Water Data System operated by the US Geological Survey and cooperation State and Federal agencies in Kentucky.

  19. US Energy Production over the Years Data | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    US Energy Production over the Years Data US Energy Production over the Years Data File totalstateslink.xlsx Office spreadsheet icon totalsectorslink.xls Binary Data ...

  20. One Year into President's Climate Action Plan, Finance Playing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    One Year into President's Climate Action Plan, Finance Playing an Important Role One Year into President's Climate Action Plan, Finance Playing an Important Role June 25, 2014 - ...

  1. The Galaxy Evolution Explorer: Results from the First Year (Conference...

    Office of Scientific and Technical Information (OSTI)

    Galaxy Evolution Explorer: Results from the First Year Citation Details In-Document Search Title: The Galaxy Evolution Explorer: Results from the First Year You are accessing a ...

  2. ENERGY STAR PortfolioManager Current Year Instructions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Current Year" Time frame Select "Multiple Properties" Using filters, choose properties to ... it as an Excel file Open downloaded "Current Year" report, select all and copy In ...

  3. David Telles wins NNSA Security Professional of the Year award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Professional of the Year award David Telles wins NNSA Security Professional of the Year award The award recognizes one federal employee and one contractor employee whose...

  4. NNSA Celebrates 10 Years of Cooperation with Russia in Securing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Celebrates 10 Years of Cooperation with Russia in Securing Nuclear Material NNSA Celebrates 10 Years of Cooperation with Russia in Securing Nuclear Material Moscow, Russia The ...

  5. 10 science highlights celebrating 10 years of Argonne Leadership...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 science highlights celebrating 10 years of Argonne Leadership Computing Facility ... of the universe over billions of years-allowing scientists to "watch" as galaxies form. ...

  6. LANL Produces First Plutonium Pit in 14 Years | National Nuclear...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Produces First Plutonium Pit in 14 Years LANL Produces First Plutonium Pit in 14 Years Los Alamos, NM NNSA's Los Alamos National Laboratory (LANL) announced that it has ...

  7. Southwest U.S. undergoes megadroughts lasting hundreds of years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Southwest U.S. undergoes megadroughts lasting hundreds of years Southwest U.S. undergoes megadroughts lasting hundreds of years Sediment core 260-feet long peers back in ...

  8. Students flock to Science on Saturday, 22 years running | National...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Students flock to Science on Saturday, 22 years running Friday, March 25, 2016 - 9:51am ... DODDOE NNSA Joint Munitions Program: 30 years of collaborative innovation NNSA ...

  9. Evaluation Helps Pesticide Program Finish Project Four Years...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pesticide Program Finish Project Four Years Sooner Than Estimated Evaluation Helps Pesticide Program Finish Project Four Years Sooner Than Estimated This document from the U.S. ...

  10. China Technology Center Celebrates 15 Years | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    China Technology Center Celebrates 15 Years of Innovation "In China for China" Click to ... GE's China Technology Center Celebrates 15 Years of Innovation "In China for China" ...

  11. "ONE HUNDRED YEARS OF SUPERCONDUCTIVITY", Dr. Michael Norman...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    "ONE HUNDRED YEARS OF SUPERCONDUCTIVITY", Dr. Michael Norman, Materials Science Division, Argonne National Laboratory ONE HUNDRED YEARS OF SUPERCONDUCTIVITY PPPL Entrance ...

  12. The Office of Environmental Management Celebrates 20 years (1989...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Office of Environmental Management Celebrates 20 years (1989-2009) Work progresses ... The EM program has made significant progress in its 20 years, reducing risk and ...

  13. Bruce Held Announces Retirement After Nearly 40 Years of Public...

    National Nuclear Security Administration (NNSA)

    Bruce Held Announces Retirement After Nearly 40 Years of Public Service Wednesday, June ... Related News Sandia California celebrates 60 years Managing the data deluge for national ...

  14. 10 highlights celebrating 10 years of Argonne Leadership Computing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 highlights celebrating 10 years of Argonne Leadership Computing Facility February 2, ... of the universe over billions of years - allowing scientists to "watch" as galaxies form. ...

  15. ALS "Workhorse" Endstation Retires after 22 Years of Service

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    "Workhorse" Endstation Retires after 22 Years of Service ALS "Workhorse" Endstation Retires after 22 Years of Service Print Following a career spanning over two decades, ALS ...

  16. Sandia Researchers Score MRS "Outstanding" Rating Two Years Running

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Score MRS "Outstanding" Rating Two Years Running - Sandia Energy Energy Search Icon Sandia ... Sandia Researchers Score MRS "Outstanding" Rating Two Years Running HomeAdvanced ...

  17. Number of NERSC Users and Projects Through the Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Users and Projects Through the Years Careers Visitor Info Web Policies Home About Usage and User Demographics Users and Projects Through the Years Number of NERSC Users ...

  18. 20 Years of Solar Measurements: The Solar Radiation Research...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Years of Solar Measurements: The Solar Radiation Research Laboratory (SRRL) at NREL Tom ...midcsrrlbms). Of course, in the early years before the internet, we could only ...

  19. Rich Hawryluk recalls "exciting and challenging" years working...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rich Hawryluk recalls "exciting and challenging" years working on ITER By John Greenwald ... despite the financial crisis that has engulfed European economies in recent years. ...

  20. National Renewable Energy Laboratory 10 Year Site Plan FY 2007...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 National Renewable Energy...

  1. Former Russian Nuclear Energy Official Sentenced to Four Years...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Former Russian Nuclear Energy Official Sentenced to Four Years in Prison for Money Laundering Conspiracy Former Russian Nuclear Energy Official Sentenced to Four Years in Prison ...

  2. DOE Announces Acquisition Strategy for Post Fiscal Year 2016...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos ...

  3. Kairos Consulting Worldwide Wins HUBZone Business of the Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Kairos Consulting Worldwide Wins HUBZone Business of the Year Award at Small Business Forum & Expo Kairos Consulting Worldwide Wins HUBZone Business of the Year Award at Small ...

  4. Property:Building/YearConstruction1 | Open Energy Information

    Open Energy Info (EERE)

    1 (taxation year) Subproperties This property has the following 1 subproperty: S Sweden Building 05K0004 Pages using the property "BuildingYearConstruction1" Showing 25...

  5. Combined Fiscal Year (FY) 2006 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2006 Annual ...

  6. Combined Fiscal Year (FY) 2007 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2007 Annual ...

  7. Combined Fiscal Year (FY) 2010 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2010 Annual ...

  8. Combined Fiscal Year (FY) 2009 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2009 Annual ...

  9. Waste Management Committee Fiscal Year 2015 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Work Plan Waste Management Committee Fiscal Year 2015 Work Plan Topics: TA-54 Consent ... Environmental Monitoring and Remediation Committee Fiscal Year 2015 Work Plan ...

  10. Combined Fiscal Year (FY) 2013 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2013 Annual ...

  11. State Energy Program Fiscal Year 2016 Competitive Funding Opportunity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2016 Competitive Funding Opportunity Announcement State Energy Program Fiscal Year 2016 Competitive Funding Opportunity Announcement The U.S. Department of Energy's ...

  12. FTCP Annual Report - Fiscal Year 2002 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 FTCP Annual Report - Fiscal Year 2002 This report covers the period from June 1, 2001, ... More Documents & Publications FTCP Annual Plan - Fiscal Year 2003 FTCP Annual Plan - ...

  13. Combined Fiscal Year (FY) 2012 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2012 Annual ...

  14. Waste Management Committee Fiscal Year 2016 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Work Plan Waste Management Committee Fiscal Year 2016 Work Plan Topics: TA-54 WIPP ... More Documents & Publications Waste Management Committee Fiscal Year 2014 Work Plan Waste ...

  15. Supplemental Information for Fiscal Year 2017 Project Prioritization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Information for Fiscal Year 2017 Project Prioritization Supplemental Information for Fiscal Year 2017 Project Prioritization Topic: David Rhodes DOE, Provided ...

  16. Guidance for Fiscal Year 2015 Facilities Information Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2015 Facilities Information Management System Data Validations Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations PDF icon FIMS ...

  17. Waste Management Committee Fiscal Year 2014 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Work Plan Waste Management Committee Fiscal Year 2014 Work Plan Topics: TA-54 Consent ... More Documents & Publications Waste Management Committee Fiscal Year 2016 Work Plan ...

  18. Combined Fiscal Year (FY) 2011 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2011 Annual ...

  19. DOE Celebrates 20-Year Anniversary of Executive Order 12898 on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Celebrates 20-Year Anniversary of Executive Order 12898 on Environmental Justice DOE Celebrates 20-Year Anniversary of Executive Order 12898 on Environmental Justice April 8, ...

  20. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cover Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Cover The Geothermal Technologies Program Multi-Year Research, Development and ...

  1. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Summary Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Executive Summary The Geothermal Technologies Program Multi-Year ...

  2. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Analysis Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Analysis The Geothermal Technologies Program Multi-Year Research, ...

  3. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Management The Geothermal Technologies Program Multi-Year Research, ...

  4. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Benefits Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Benefits The Geothermal Technologies Program Multi-Year Research, ...

  5. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Integration Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Systems Integration The Geothermal Technologies Program Multi-Year ...

  6. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Coordination Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Coordination The Geothermal Technologies Program Multi-Year Research, ...

  7. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Challenges Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Challenges The Geothermal Technologies Program Multi-Year Research, ...

  8. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Foreword Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Foreword The Geothermal Technologies Program Multi-Year Research, Development and ...

  9. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Table of Contents Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Table of Contents The Geothermal Technologies Program Multi-Year ...

  10. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Introduction Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Introduction The Geothermal Technologies Program Multi-Year Research, ...

  11. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multi-Year Research, Development and Demonstration Plan Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan The Geothermal Technologies Program ...

  12. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Plan Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Technical Plan The Geothermal Technologies Program Multi-Year Research, ...

  13. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appendices Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Appendices The Geothermal Technologies Program Multi-Year Research, Development ...

  14. Fifty years of nuclear fission: Nuclear data and measurements...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Fifty years of nuclear fission: Nuclear data and measurements series Citation Details In-Document Search Title: Fifty years of nuclear fission: Nuclear data and ...

  15. Year-in-Review: 2012 Energy Infrastructure Events and Expansions...

    Energy Savers [EERE]

    2 Energy Infrastructure Events and Expansions (July 2013) Year-in-Review: 2012 Energy Infrastructure Events and Expansions (July 2013) The Year-in-Review (YIR): 2012 Energy...

  16. Fiscal Year 2013 Department of Energy Annual Occupational Safety...

    Office of Environmental Management (EM)

    Fiscal Year 2013 Department of Energy Annual Occupational Safety and Health Report for Federal Employees to the Secretary of Labor Fiscal Year 2013 Department of Energy Annual ...

  17. Classification CommuniQu - Year: 2015 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    newsletters for the year 2015, consisting of the following issues: CommuniQue 2015-1 - Spring 2015 More Documents & Publications Classification CommuniQu - Year: 2014...

  18. In H Canyon's 60th Year, Retirees Remember Facility's Beginnings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In H Canyon's 60th Year, Retirees Remember Facility's Beginnings and Challenging Careers In H Canyon's 60th Year, Retirees Remember Facility's Beginnings and Challenging Careers...

  19. Better Buildings Challenge Reports First Year's Savings; Partners...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reports First Year's Savings; Partners on Track to Meet 2020 Goal Better Buildings Challenge Reports First Year's Savings; Partners on Track to Meet 2020 Goal May 22, 2013 -...

  20. DOE Exercises 5 Year Option on Washington TRU Solutions Contract...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP January 18, 2005 - ...