Powered by Deep Web Technologies
Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory  

SciTech Connect (OSTI)

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

1993-07-01T23:59:59.000Z

2

Strategic capacity in post devolution government in the UK: A comparative analysis of the lifecycle of central strategy units   

E-Print Network [OSTI]

This thesis analyses the changing role of central government strategy units in the devolved UK polity using a lifecycle model. At each stage of the lifecycle the units develop a different aim, undertake different tasks and follow different working...

MacDougall, Audrey

2007-06-27T23:59:59.000Z

3

University of Central Florida Students' Energy Saving Work Showcased...  

Energy Savers [EERE]

a new video encouraging college students to help America save energy, save money and cut pollution. The video highlights the work of students at the University of Central Florida...

4

Answers for Homework Handout for unit 4 Work and Energy  

E-Print Network [OSTI]

potential energy spinning top: (rotational) kinetic energy pot of hot water: thermal (kinetic) energy x-rays: electromagnetic energy (not really "storage" per se, however) 6. From the top to the bottom, the gymnast's centerAnswers for Homework Handout for unit 4 Work and Energy 1. Here we use W = F D = FD cos : a) W

Mansell, Edward "Ted"

5

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A Phase I RFI was completed at WIPP as part of a Voluntary Release Assessment (VRA). The risk-based decision criteria recommended by EPA for the VRA were contained in a proposed Corrective Action rule for SWMUs (EPA, 1990). EPA Region VI has issued new risk-based screening criteria applicable to the WIPP SWMUs and AOCs.

Washington TRU Solutions LLC

2000-02-25T23:59:59.000Z

6

Saving the soil: AgriLife units work to improve training terrain  

E-Print Network [OSTI]

Saving the soil AgriLife units work to improve training terrain Story by Melanie Orth txH2O | pg. 9 Heavy tanks and armored vehicles that have continually rolled over the 67,000-acre West Range at Fort Hood for the past 60 years have... accelerated soil erosion. Fort Hood, the largest active duty armored post in the U.S. Armed Services and located near Killeen in central Texas, uses the range as the primary training and maneuver area for two armored divisions. The Texas Water...

Orth, Melanie

2011-01-01T23:59:59.000Z

7

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

Washington TRU Solutions LLC

2001-02-25T23:59:59.000Z

8

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-02-14T23:59:59.000Z

9

SAFETY COMMITTEE ANNUAL PLAN TEMPLATE The safety committee and the unit administration work together in promoting the unit's safety and  

E-Print Network [OSTI]

SAFETY COMMITTEE ANNUAL PLAN TEMPLATE The safety committee and the unit administration work together in promoting the unit's safety and health efforts. The Safety Committee Annual Plan provides. Supervisors can review the plan with new employees during their safety orientation. 3. Safety committee

Collins, Gary S.

10

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

SciTech Connect (OSTI)

This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

K. Campbell

2000-04-01T23:59:59.000Z

11

Central and Eastern United States (CEUS) Seismic Source Characterization (SSC) for Nuclear Facilities Project  

SciTech Connect (OSTI)

This report describes a new seismic source characterization (SSC) model for the Central and Eastern United States (CEUS). It will replace the Seismic Hazard Methodology for the Central and Eastern United States, EPRI Report NP-4726 (July 1986) and the Seismic Hazard Characterization of 69 Nuclear Plant Sites East of the Rocky Mountains, Lawrence Livermore National Laboratory Model, (Bernreuter et al., 1989). The objective of the CEUS SSC Project is to develop a new seismic source model for the CEUS using a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 assessment process. The goal of the SSHAC process is to represent the center, body, and range of technically defensible interpretations of the available data, models, and methods. Input to a probabilistic seismic hazard analysis (PSHA) consists of both seismic source characterization and ground motion characterization. These two components are used to calculate probabilistic hazard results (or seismic hazard curves) at a particular site. This report provides a new seismic source model. Results and Findings The product of this report is a regional CEUS SSC model. This model includes consideration of an updated database, full assessment and incorporation of uncertainties, and the range of diverse technical interpretations from the larger technical community. The SSC model will be widely applicable to the entire CEUS, so this project uses a ground motion model that includes generic variations to allow for a range of representative site conditions (deep soil, shallow soil, hard rock). Hazard and sensitivity calculations were conducted at seven test sites representative of different CEUS hazard environments. Challenges and Objectives The regional CEUS SSC model will be of value to readers who are involved in PSHA work, and who wish to use an updated SSC model. This model is based on a comprehensive and traceable process, in accordance with SSHAC guidelines in NUREG/CR-6372, Recommendations for Probabilistic Seismic Hazard Analysis: Guidance on Uncertainty and Use of Experts. The model will be used to assess the present-day composite distribution for seismic sources along with their characterization in the CEUS and uncertainty. In addition, this model is in a form suitable for use in PSHA evaluations for regulatory activities, such as Early Site Permit (ESPs) and Combined Operating License Applications (COLAs). Applications, Values, and Use Development of a regional CEUS seismic source model will provide value to those who (1) have submitted an ESP or COLA for Nuclear Regulatory Commission (NRC) review before 2011; (2) will submit an ESP or COLA for NRC review after 2011; (3) must respond to safety issues resulting from NRC Generic Issue 199 (GI-199) for existing plants and (4) will prepare PSHAs to meet design and periodic review requirements for current and future nuclear facilities. This work replaces a previous study performed approximately 25 years ago. Since that study was completed, substantial work has been done to improve the understanding of seismic sources and their characterization in the CEUS. Thus, a new regional SSC model provides a consistent, stable basis for computing PSHA for a future time span. Use of a new SSC model reduces the risk of delays in new plant licensing due to more conservative interpretations in the existing and future literature. Perspective The purpose of this study, jointly sponsored by EPRI, the U.S. Department of Energy (DOE), and the NRC was to develop a new CEUS SSC model. The team assembled to accomplish this purpose was composed of distinguished subject matter experts from industry, government, and academia. The resulting model is unique, and because this project has solicited input from the present-day larger technical community, it is not likely that there will be a need for significant revision for a number of years. See also Sponsors Perspective for more details. The goal of this project was to implement the CEUS SSC work plan for developing a regional CEUS SSC model. The work plan, formulated by the project manager and a

Kevin J. Coppersmith; Lawrence A. Salomone; Chris W. Fuller; Laura L. Glaser; Kathryn L. Hanson; Ross D. Hartleb; William R. Lettis; Scott C. Lindvall; Stephen M. McDuffie; Robin K. McGuire; Gerry L. Stirewalt; Gabriel R. Toro; Robert R. Youngs; David L. Slayter; Serkan B. Bozkurt; Randolph J. Cumbest; Valentina Montaldo Falero; Roseanne C. Perman' Allison M. Shumway; Frank H. Syms; Martitia (Tish) P. Tuttle [Tish

2012-01-31T23:59:59.000Z

12

United Nations Conference on Trade and Development Making Certification Work for Sustainable  

E-Print Network [OSTI]

United Nations Conference on Trade and Development Making Certification Work for Sustainable ..................................................................... 31 Chapter 5. Making certification work for sustainable development: the way ahead Development: The Case of Biofuels United Nations New York and Geneva, 2008 #12;ii Note The designations

13

Company: American Pool Management Work Location: Edison, NJ Local Pools throughout Central and North Jersey  

E-Print Network [OSTI]

Company: American Pool Management Work Location: Edison, NJ ­ Local Pools throughout Central and North Jersey Pay Rate: $9-$12/hour Type of Business: Swimming Pool Management Job Title: Seasonal Staffing Assistant, Seasonal Area Supervisors, Seasonal Pool Managers, Seasonal Lifeguards Start Date: May

Hanson, Stephen José

14

THE IMPACT OF WORK UNIT AND ORGANIZATION SUPPORT ON HOSPITAL PATIENT SAFETY  

E-Print Network [OSTI]

Based on the construct of a culture of safety, the study purpose was to discern the relationships between Organization Support (OS) and Work Unit Support (WS) on Hospital Patient Safety. OS and WS were operationalized ...

Kemper, Carol Ann

2009-01-27T23:59:59.000Z

15

Cloud-to-ground lightning characteristics of warm season Mesoscale Convection Systems in the Central United States: 1992-1993  

E-Print Network [OSTI]

This study provides a detailed analysis of cloud-to-aphics. ground (CG) lightning flashes within individual Mesoscale Convective Systems (MCSs) that occurred in the Central United States during May-August of 1992 and 1993. Analysis of the CG...

Hoeth, Brian Richard

2012-06-07T23:59:59.000Z

16

A study of wind-speed maxima near the surface over the south central United States  

E-Print Network [OSTI]

-1960) and the Oklahoma City radiosonde station data for the time period June, 1966 to May, 1967. They also showed that the higher the monthly, mean, wind speed, the more likely that the wind direction was from the south. Bonner (1968) states, "Strong early morning...) (Member) (Member) May 1973 ABSTRACT A Study of Wind-Speed Maxima near the Surface over the South Central United States (May 1973) Samuel K. Beckman, B. S. , Kansas State University Directed by: Professor Walter K. Henry Radiosonde and rawinsonde...

Beckman, Samuel Karl

2012-06-07T23:59:59.000Z

17

2008 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443  

SciTech Connect (OSTI)

This report presents the 2008 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Subsurface Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of the CNTA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof-of-concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 443 that were conducted at the site during fiscal year 2008. This is the second groundwater monitoring report prepared by DOE-LM for the CNTA.

None

2009-03-01T23:59:59.000Z

18

Fluid Management Plan Central Nevada Test Area Corrective Action Unit 443  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing at sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. Responsibility for environmental restoration of the sites that constitute the Offsites Project was transferred from the DOE Office of Environmental Management to the DOE Office of Legacy Management (LM) on October 1, 2006. The scope of this Fluid Management Plan (FMP) is to support subsurface investigations at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996). The subsurface CAU 443 is associated with the underground nuclear testing conducted at UC-1 and is located approximately 30 miles north of Warm Springs in Nye County, Nevada.

None

2009-01-01T23:59:59.000Z

19

Smith Lever Act Cooperative extension work between the Land-Grant Colleges and the United State  

E-Print Network [OSTI]

Smith Lever Act Cooperative extension work between the Land-Grant Colleges and the United State Department of Agriculture is authorized by the Smith-Lever Act. The provisions of the Act, in effect in Oregon Oregon 4-H Program Handbook Smith Lever Act February 1995 The amount paid by the Federal

Tullos, Desiree

20

Future work: This section is one of the repeat units in the PET structure.  

E-Print Network [OSTI]

Future work: This section is one of the repeat units in the PET structure. Ester groupEster group--because of proprietary considerations--cannot be named here. The reason for this research PET is a form a plastic = many esters, or polyester. The letters in PET come from its formal name which is polyethylene

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443  

SciTech Connect (OSTI)

This report presents the 2007 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of the CNTA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. Requirements for CAU 443 are specified in the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense, and the State of Nevada and includes groundwater monitoring in support of site closure. This is the first groundwater monitoring report prepared by DOE-LM for the CNTA The CNTA is located north of U.S. Highway 6, approximately 30 miles north of Warm Springs in Nye County, Nevada (Figure 1). Three emplacement boreholes, UC-1, UC-3, and UC-4, were drilled at the CNTA for underground nuclear weapons testing. The initial underground nuclear test, Project Faultless, was conducted in borehole UC-1 at a depth of 3,199 feet (ft) (975 meters) below ground surface on January 19, 1968. The yield of the Project Faultless test was estimated to be 0.2 to 1 megaton (DOE 2004). The test resulted in a down-dropped fault block visible at land surface (Figure 2). No further testing was conducted at the CNTA, and the site was decommissioned as a testing facility in 1973.

None

2008-04-01T23:59:59.000Z

22

2010 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443  

SciTech Connect (OSTI)

This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Subsurface Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of CNTA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof-of-concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 443 that were conducted at the site from December 2009 through December 2010. It also represents the second year of the enhanced monitoring network and the 5-year proof-of-concept monitoring period that is intended to validate the compliance boundary

None

2011-02-01T23:59:59.000Z

23

2009 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443  

SciTech Connect (OSTI)

This report presents the 2009 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Subsurface Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of CNTA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof-of-concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 443 that were conducted at the site from October 2008 through December 2009. It also represents the first year of the enhanced monitoring network and begins the new 5-year proof-of-concept monitoring period that is intended to validate the compliance boundary

None

2010-09-01T23:59:59.000Z

24

Well Completion Report for Corrective Action Unit 443 Central Nevada Test Area Nye County, Nevada  

SciTech Connect (OSTI)

The drilling program described in this report is part of a new corrective action strategy for Corrective Action Unit (CAU) 443 at the Central Nevada Test Area (CNTA). The drilling program included drilling two boreholes, geophysical well logging, construction of two monitoring/validation (MV) wells with piezometers (MV-4 and MV-5), development of monitor wells and piezometers, recompletion of two existing wells (HTH-1 and UC-1-P-1S), removal of pumps from existing wells (MV-1, MV-2, and MV-3), redevelopment of piezometers associated with existing wells (MV-1, MV-2, and MV-3), and installation of submersible pumps. The new corrective action strategy includes initiating a new 5-year proof-of-concept monitoring period to validate the compliance boundary at CNTA (DOE 2007). The new 5-year proof-of-concept monitoring period begins upon completion of the new monitor wells and collection of samples for laboratory analysis. The new strategy is described in the Corrective Action Decision Document/Corrective Action Plan addendum (DOE 2008a) that the Nevada Division of Environmental Protection approved (NDEP 2008).

None

2009-12-01T23:59:59.000Z

25

RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

Not Available

1993-06-01T23:59:59.000Z

26

Saving the soil: AgriLife units work to improve traning terrain  

E-Print Network [OSTI]

quality of supply reservoirs. The revegetation project began in 2003, and project members started evaluating the addition of composted dairy manure to primary training areas as a management practice. Compost enhances soil quality and promotes...Saving the soil AgriLife units work to improve training terrain Story by Melanie Orth txH2O | pg. 9 Heavy tanks and armored vehicles that have continually rolled over the 67,000-acre West Range at Fort Hood for the past 60 years have...

Orth, Melanie

2010-01-01T23:59:59.000Z

27

Description of work for vadose borings in support of 200-UP-2 Unit  

SciTech Connect (OSTI)

This description of work (DOW) details the field activities associated with the vadose zone drilling and soil sampling in the 200-UP-2 Operable Unit (Task 2, 3, and 5) and will serve as a field guide for those performing the work. It will be used in conjunction with the 200-UP-2 RCRA Facility Investigation/Corrective Measures Study (DOE-RL 1993a,[LFI]) and Site Characterization Manual (WHC 1988a). Vadose zone borings are being constructed to characterize the vertical and horizontal extent of contaminants in sediments within and beneath the cribs. The locations for the proposed borings are presented in Figure 1. The contaminants of concern for the project are presented in Table 1.

Kelty, G.G.

1993-08-27T23:59:59.000Z

28

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

SciTech Connect (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

29

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

SciTech Connect (OSTI)

his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

30

Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

Not Available

1992-09-01T23:59:59.000Z

31

Hydrologic Data for the Groundwater Flow and Contaminant Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada, Revision 0  

SciTech Connect (OSTI)

This report documents the analysis of the available hydrologic data conducted in support of the development of a Corrective Action Unit (CAU) groundwater flow model for Central and Western Pahute Mesa: CAUs 101 and 102.

Drici, Warda

2004-02-01T23:59:59.000Z

32

Contaminant Transport Parameters for the Groundwater Flow and Contaminant Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada, Revision 0  

SciTech Connect (OSTI)

This report documents the analysis of the available transport parameter data conducted in support of the development of a Corrective Action Unit (CAU) groundwater flow model for Central and Western Pahute Mesa: CAUs 101 and 102.

Drici, Warda

2003-08-01T23:59:59.000Z

33

Bulk Sediment Qp and Qs in the Mississippi Embayment, Central United States Charles A. Langston  

E-Print Network [OSTI]

, unconsolidated sediments of the Mississippi embayment, central U.S., using the spectral distance decay estimates and imply that unconsolidated sediments of the embayment do not significantly attenuate small Q values also imply that the unconsolidated sediments of the embayment will form an efficient wave

Langston, Charles A.

34

Horizontal velocities in the central and eastern United States from GPS surveys during the 1987-1996 interval  

SciTech Connect (OSTI)

The National Geodetic Survey and the Nuclear Regulatory Commission jointly organized GPS surveys in 1987, 1990, 1993, and 1996 to search for crustal deformation in the central and eastern United States (east of longitude 108{degrees}W). We have analyzed the data of these four surveys in combination with VLBI data observed during the 1979-1995 interval and GPS data for 22 additional surveys observed during the 1990-1996 interval. These latter GPS surveys served to establish accurately positioned geodetic marks in various states. Accordingly, we have computed horizontal velocities for 64 GPS sites and 12 VLBI sites relative to a reference frame for which the interior of the North American plate is considered fixed on average. None of our derived velocities exceeds 6 mm/yr in magnitude. Moreover, the derived velocity at each GPS site is statistically zero at the 95% confidence level except for the site BOLTON in central Ohio and the site BEARTOWN in southeastern Pennsylvania. However, as statistical theory would allow approximately 5% of the 64 GPS sites to fall our zero-velocity hypothesis, we are uncertain whether or not these estimated velocities for BOLTON and BEARTOWN reflect actual motion relative to the North American plate. We also computed horizontal strain rates for the cells formed by a 1{degrees} by 1{degrees} grid spanning the central and eastern United States. Corresponding shearing rates are everywhere less than 60 nanoradians/yr in magnitude, and no shearing rate differs statistically from zero at the 95% confidence level except for a grid cell near BEARTOWN whose rate is 57 {+-} 26 nanoradians/yr. Also corresponding areal dilatation rates are everywhere less than 40 nanostrain/yr in magnitude, and no dilatation rate differs statistically from zero at the 95% confidence level.

Snay, R.A.; Strange, W.E.

1997-12-01T23:59:59.000Z

35

Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release and migration behavior (Pohlmann et al., 2000). The second modeling phase (known as a Data Decision Analysis [DDA]) occurred after the Nevada Division of Environmental Protection reviewed the first model and was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third modeling phase updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003).

Susan Evans

2004-11-01T23:59:59.000Z

36

RADICALS AND UNITS IN RAMANUJAN'S WORK Bruce C. Berndt, Heng Huat Chan, and Liang--Cheng Zhang  

E-Print Network [OSTI]

RADICALS AND UNITS IN RAMANUJAN'S WORK Bruce C. Berndt, Heng Huat Chan, and Liang--Cheng Zhang's lost notebook. Typeset by A M S­T E X 1 #12; 2 BRUCE C. BERNDT, HENG HUAT CHAN, AND LIANG--CHENG ZHANG

Berndt, Bruce C.

37

RADICALS AND UNITS IN RAMANUJAN'S WORK Bruce C. Berndt, Heng Huat Chan, and LiangCheng Zhang  

E-Print Network [OSTI]

RADICALS AND UNITS IN RAMANUJAN'S WORK Bruce C. Berndt, Heng Huat Chan, and Liang­Cheng Zhang. Typeset by AMS-TEX 1 #12;2 BRUCE C. BERNDT, HENG HUAT CHAN, AND LIANG­CHENG ZHANG Radicals arise in other

Berndt, Bruce C.

38

Equality Advisor (Race, Religion and Belief) The Equality and Diversity Unit works in partnership with University bodies, academic  

E-Print Network [OSTI]

Equality Advisor (Race, Religion and Belief) The Equality and Diversity Unit works in partnership and cultural awareness. The Equality Advisor in this area also facilitates the Race Equality Network, for both staff and students. Equality Advisor for Race, Religion and Belief has responsibility for: · considering

Henderson, Gideon

39

Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area, Nye County, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites, Corrective Action Unit 443'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first phase involved the gathering and interpretation of geologic and hydrogeologic data, and inputting the data into a three-dimensional numerical model to depict groundwater flow. The output from the groundwater flow model was used in a transport model to simulate the migration of a radionuclide release (Pohlmann et al., 2000). The second phase of modeling (known as a Data Decision Analysis [DDA]) occurred after NDEP reviewed the first model. This phase was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third phase of modeling updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003). Corrective action alternatives were evaluated and an alternative was submitted in the ''Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface'' (NNSA/NSO, 2004). Based on the results of this evaluation, the preferred alternative for CAU 443 is Proof-of-Concept and Monitoring with Institutional Controls. This alternative was judged to meet all requirements for the technical components evaluated and will control inadvertent exposure to contaminated groundwater at CAU 443.

Tim Echelard

2006-01-01T23:59:59.000Z

40

Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

Not Available

1993-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Differential pricing in the transportation of grain in the North Central Region of the United States  

E-Print Network [OSTI]

element because of the 5 N. Lo Fair and John Guandolo, Tedrow's Re lation of Trans or- tation, ied. W. D. Thompson (6th ed. ; Dubuque, Iowa: Wm. C. Brown, 1964 ), po 11. 6 Truman C. Bighorn and Nerrill J. Roberts, Trans ortation Prin- ciples... of this thesis. Dr. John G. McNeely and Mr. J. G. Darroch also provided helpful sug- gestions in this work. A special thanks to Mr. Hoy A. Richards, Associate Research Economist at the Texas Transportati. on Institute for his encouragement in the development...

Lamkin, Jack Thurman

1968-01-01T23:59:59.000Z

42

2012 Groundwater Monitoring Report Central Nevada Test Area, Subsurface Corrective Action Unit 443  

SciTech Connect (OSTI)

The Central Nevada Test Area was the site of a 0.2- to 1-megaton underground nuclear test in 1968. The surface of the site has been closed, but the subsurface is still in the corrective action process. The corrective action alternative selected for the site was monitoring with institutional controls. Annual sampling and hydraulic head monitoring are conducted as part of the subsurface corrective action strategy. The site is currently in the fourth year of the 5-year proof-of-concept period that is intended to validate the compliance boundary. Analytical results from the 2012 monitoring are consistent with those of previous years. Tritium remains at levels below the laboratory minimum detectable concentration in all wells in the monitoring network. Samples collected from reentry well UC-1-P-2SR, which is not in the monitoring network but was sampled as part of supplemental activities conducted during the 2012 monitoring, indicate concentrations of tritium that are consistent with previous sampling results. This well was drilled into the chimney shortly after the detonation, and water levels continue to rise, demonstrating the very low permeability of the volcanic rocks. Water level data from new wells MV-4 and MV-5 and recompleted well HTH-1RC indicate that hydraulic heads are still recovering from installation and testing. Data from wells MV-4 and MV-5 also indicate that head levels have not yet recovered from the 2011 sampling event during which several thousand gallons of water were purged. It has been recommended that a low-flow sampling method be adopted for these wells to allow head levels to recover to steady-state conditions. Despite the lack of steady-state groundwater conditions, hydraulic head data collected from alluvial wells installed in 2009 continue to support the conceptual model that the southeast-bounding graben fault acts as a barrier to groundwater flow at the site.

None

2013-04-01T23:59:59.000Z

43

Closure Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

SciTech Connect (OSTI)

The following site closure activities were performed at the 34 Corrective Action Sites (CASs) comprising Corrective Action Unit (CAU) 417 and are documented in this report: (1) No closure action was taken at 13 CASs (17 sites): 58-05-01,58-07-01,58-05-04, 58-09-05 (Mud Pits C and D only), 58-35-01,58-05-02,58-09-06 (Mud Pits A, B, C, and D), 58-10-06,58-19-01,58-35-02,58-44-04,58-05-04, and 58-09-03 (Mud Pit E only). (2) Housekeeping activities, collecting scrap materials, and transporting to approved landfill sites at the NTS were used to close seven CASs: 58-44-01,58-44-02,58-44-05, 58-98-03,58-98-01,58-98-02, and 58-98-04. (3) Two CASs (58-05-03 and 58-99-01) were closed by excavation and removal of USTs. (4) Two septic tanks (CASs 58-05-05 and 58-05-06) were closed by backfilling with clean fill. (5) Site posting with above-grade monuments and attached warning signs and land-use restrictions were used to close seven CASs (nine sites): 58-09-02,58-09-05 (Mud Pit E only), 58-09-06 (Mud Pit E only), 58-10-01,58-25-01,58-09-03 (Mud Pits A, B, and D), and 58-10-05. (6) Clean closure by excavation soil with TPH levels greater than the NDEP action level of 100 mg/kg and limited regrading was used to close five CASs: 58-10-03,58-44-06, 58-44-03,58-10-02, and 58-10-04. (7) Construction of engineered covers was used to close in place two CASs: 58-09-01 and 58-09-03 (Mud Pit C only). Following construction, a fence was constructed around each cover to prevent damage to the cover or intrusion by wildlife.

K. B. Campbell

2001-11-01T23:59:59.000Z

44

Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

Not Available

1994-03-01T23:59:59.000Z

45

Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This Remedial Investigation (RI) Work Plan specifically addresses Chestnut Ridge Operable Unit 1, (OU1) which consists of the Chestnut Ridge Security Pits (CRSP). The CRSP are located {approximately}800 ft southeast of the central portion of the Y-12 Plant atop Chestnut Ridge, which is bounded to the northwest by Bear Creek Valley and to the southeast by Bethel Valley. Operated from 1973 to 1988, the CRSP consisted of a series of trenches used for the disposal of classified hazardous and nonhazardous waste materials. Disposal of hazardous waste materials was discontinued in December 1984, while nonhazardous waste disposal ended on November 8, 1988. An RI is being conducted at this site in response to CERCLA regulations. The overall objectives of the RI are to collect data necessary to evaluate the nature and extent of contaminants of concern (COC), support an ecological risk assessment (ERA) and a human health risk assessment (HHRA), support the evaluation of remedial alternatives, and ultimately develop a Record of Decision for the site. The purpose of this Work Plan is to outline RI activities necessary to define the nature and extent of suspected contaminants at Chestnut Ridge OU1. Potential migration pathways also will be investigated. Data collected during the RI will be used to evaluate the overall risk posed to human health and the environment by OU1.

Not Available

1993-09-01T23:59:59.000Z

46

Developing Nurse and Physician Questionnaires to Assess Primary Work Areas in Intensive Care Units  

E-Print Network [OSTI]

extracted Items Factor Loadings S p ac e , furniture, a n d eq u ip m e nt in primary work sp a c e – 6 items S p ac e , furniture, and equipmen t in primary workspace 1. The amount of space in y our primary workspace...:76–81. 8. Fischer JE, Calame A, Detting AC, Zeier H, Fanconi S. Experience and endocrine stress responses in neonatal and pediatric critical care nurses and physicians. Crit Care Med 2000, 28:3281. 9. Fischer JE, Calame A, Dettling AC. Objectifying...

Rashid, Mahbub; Boyle, Diane K.; Crosser, Michael

2014-07-01T23:59:59.000Z

47

Engineering work plan for PFP criticality alarm panel first unit re-build  

SciTech Connect (OSTI)

This document describes the first step in increasing the quality, reliability, and ease of maintenance of the nine Criticality Alarm Panels (CAP) at PFP. Development control practices and guidelines of WHC-CM-6-1, EP-2.4 and WHC-IP-1026, EPG-2.4 are applied to develop a prototype of a replacement Criticality Alarm Panel (CAP) with facility-use potential. During the development of the prototype CAP, the design requirements of all of PFP`s nine CAPs are considered to develop standardized hardware and detailed design drawings that are tailored to PFP maintenance needs. Increased quality and reliability is achieved through quality hardware, proven technology and design techniques, and the use of the Class 1E workmanship standards of WHC-CM-8-1. The end result of the work described by this work plan is a verified/read-to-install replacement for CAP Z4 and verified/released H-2 drawings that are formatted such that they can easily be replicated when producing design drawings for the other eight CAPs.

Clem, W.E.

1994-09-14T23:59:59.000Z

48

Streamlined Approach for Environmental Restoration Work Plan for Corrective Action Unit 461: Joint Test Assembly Sites and Corrective Action Unit 495: Unconfirmed Joint Test Assembly Sites Tonopah Test Range, Nevada  

SciTech Connect (OSTI)

This Streamlined Approach for Environmental Restoration plan addresses the action necessary for the clean closure of Corrective Action Unit 461 (Test Area Joint Test Assembly Sites) and Corrective Action Unit 495 (Unconfirmed Joint Test Assembly Sites). The Corrective Action Units are located at the Tonopah Test Range in south central Nevada. Closure for these sites will be completed by excavating and evaluating the condition of each artillery round (if found); detonating the rounds (if necessary); excavating the impacted soil and debris; collecting verification samples; backfilling the excavations; disposing of the impacted soil and debris at an approved low-level waste repository at the Nevada Test Site

Jeff Smith

1998-08-01T23:59:59.000Z

49

Development and Delivery of Ecologically-based IPM Packages in Central Asia Central Asia Regional IPM Program Year 3 Work plans  

E-Print Network [OSTI]

IPM Program ­ Year 3 Work plans (October 1, 2011 ­ September 30, 2012) Project Management Dr. Karim and government institutions. 3. Build institutional capacity through education, training and human resource, and Uzbekistan). This work will include cultural practices, botanicals and biopesticides, biological control

50

Estimating Potential Carbon Sequestration in Conservation Reserve Program (Crp) Tracts in the Central High Plains of the United States.  

E-Print Network [OSTI]

??The main goal of this research is to examine long term trends in carbon sequestration in Conservation Reserve Program (CRP) tracts in the Central High… (more)

Dung, Elisha Jasper

2012-01-01T23:59:59.000Z

51

Completion Report for Well ER-EC-14, Corrective Action Units 101 and 102: Central and Western Pahute Mesa  

SciTech Connect (OSTI)

Well ER-EC-14 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Management Operations Underground Test Area (UGTA) Activity at the Nevada National Security Site (NNSS; formerly Nevada Test Site), Nye County, Nevada. The well was drilled in September and October 2012, as part of the Central and Western Pahute Mesa Corrective Action Unit Phase II drilling program. The primary purpose of the well was to provide detailed hydrogeologic information for the Fortymile Canyon composite hydrostratigraphic unit in the Timber Mountain moat area, within the Timber Mountain caldera complex, that will help address uncertainties within the Pahute Mesa–Oasis Valley hydrostratigraphic framework model. The main 55.9-centimeter (cm) hole was drilled to a total depth of 325.5 meters (m) and cased with 40.6-cm casing to 308.1 m. The hole diameter was then decreased to 37.5 cm, and drilling continued to a total depth of 724.8 m. The completion casing string, set to the depth of 690.9 m, consists of 16.8-cm stainless-steel casing hanging from 19.4-cm carbon-steel casing. The stainless-steel casing has two slotted intervals open to the Rainier Mesa Tuff. Two piezometer strings were installed in Well ER-EC-14. Both piezometer strings, each with one slotted interval, consist of 6.0-cm carbon-steel tubing at the surface, then cross over to 7.3-cm stainless-steel tubing just above the water table. The shallow piezometer string was landed at 507.8 m, and the deep piezometer string was landed at 688.6 m. Both piezometer strings are set to monitor groundwater within moderately to densely welded Rainier Mesa Tuff. Data collected during and shortly after hole construction include composite drill cuttings samples collected every 3.0 m, various geophysical logs, water quality (including tritium and other radionuclides) measurements, and water level measurements. The well penetrated 15.2 m of alluvium and 709.6 m of Tertiary volcanic rocks. The stratigraphy and general lithology were not as expected due to the position of Well ER-EC-14 relative to the buried caldera margins of the Timber Mountain caldera complex. The well is located inside the Rainier Mesa caldera, but outside the younger Ammonia Tanks caldera. On November 5, 2012, a preliminary fluid level in the shallow piezometer string was measured at the depth of 311.8 m. This water level depth was taken before installation of the bridge plug (to be placed within the main completion casing to separate the two slotted zones). Well development, hydrologic testing, and sampling, will be conducted at a later date. No tritium above levels detectable by field methods were encountered in this hole. All Fluid Management Plan (FMP) requirements for Well ER-EC-14 were met. Analysis of monitoring samples and FMP confirmatory samples indicated that fluids generated during drilling at Well ER-EC-14 met the FMP criteria for discharge to an unlined sump or designated infiltration area. All sanitary and hydrocarbon waste generated was properly handled and disposed of.

None

2013-03-05T23:59:59.000Z

52

Well Completion Report for Well ER-20-11, Corrective Action Units 101 and 102: Central and Western Pahute Mesa  

SciTech Connect (OSTI)

Well ER-20-11 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Management Operations Underground Test Area (UGTA) Activity at the Nevada National Security Site (formerly Nevada Test Site), Nye County, Nevada. The well was drilled in September 2012 as part of the Central and Western Pahute Mesa Corrective Action Unit Phase II drilling program. Well ER-20-11 was constructed to further investigate the nature and extent of radionuclidecontaminated groundwater encountered in two nearby UGTA wells, to help define hydraulic and transport parameters for the contaminated Benham aquifer, and to provide data for the UGTA hydrostratigraphic framework model. The 44.5-centimeter (cm) surface hole was drilled to a depth of 520.0 meters (m) and cased with 34.0-cm casing to 511.5 m. The hole diameter was then decreased to 31.1 cm, and the borehole was drilled to a total depth of 915.6 m. The hole was completed to allow access for hydrologic testing and sampling in the target aquifer, which is a lava-flow aquifer known as the Benham aquifer. The completion casing string, set to the depth of 904.3 m, consists of a string of 6?-inch (in.) stainless-steel casing hanging from a string of 7?-in. carbon-steel casing. The stainless-steel casing has one slotted interval at 796.3 to 903.6 m. One piezometer string was installed, which consists of 2?-in. stainless-steel tubing that hangs from 2?-in. carbon-steel tubing via a crossover sub. This string was landed at 903.8 m and is slotted in the interval 795.3 to 903.1 m. Data collected during and shortly after hole construction include composite drill cuttings samples collected every 3.0 m, various geophysical logs, fluid samples (for groundwater chemistry analysis and tritium measurements), and water-level measurements. The well penetrated 915.6 m of Tertiary volcanic rock, including one saturated lava flow aquifer. Measurements on samples taken from the undeveloped well indicated elevated tritium levels within the Benham aquifer. The maximum tritium level measured with field equipment was 146,131 picocuries per liter from a sample obtained at the depth of 912.0 m. The fluid level was measured in the piezometer string at a depth of 504.5 m on September 26, 2012. All Fluid Management Plan (FMP) requirements for Well ER-20-11 were met. Analysis of monitoring samples and FMP confirmatory samples indicated that fluids generated during drilling at Well ER-20-11 met the FMP criteria for discharge to an unlined sump or designated infiltration area. Well development, hydrologic testing, and sampling will be conducted at a later date.

NSTec Environmental Management

2013-02-27T23:59:59.000Z

53

New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect (OSTI)

This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Nelson, L. O.

2007-06-12T23:59:59.000Z

54

The Hydrogeologic Character of the Lower Tuff Confining Unit and the Oak Springs Butte Confining Unit in the Tuff Pile Area of Central Yucca Flat  

SciTech Connect (OSTI)

The lower tuff confining unit (LTCU) in the Yucca Flat Corrective Action Unit (CAU) consists of a monotonous sequence of pervasively zeolitized volcanic tuff (i.e., mostly bedded with lesser nonwelded to poorly welded tuff; not fractured) (Bechtel Nevada, 2006). The LTCU is an important confining unit beneath Yucca Flat because it separates the alluvial and volcanic aquifers, where many underground nuclear tests were conducted, from the regional lower carbonate aquifer. Recent sub-CAU-scale modeling by Los Alamos National Laboratory in the Tuff Pile area of Yucca Flat (Boryta, et al., in review) includes postulated low-porosity, high-permeability zones (i.e., fractured welded-tuff aquifers) within the LTCU. This scenario indicates that such postulated low-porosity, high-permeability zones could provide fast-path lateral conduits to faults, and eventually to the lower carbonate aquifer. A fractured and faulted lower carbonate aquifer is postulated to provide a flow path(s) for underground test-derived contaminants to potential offsite receptors. The ramifications of such a scenario are obvious for groundwater flow and contaminant migration beneath Yucca Flat. This paper describes the reasoning for not including postulated low-porosity, high-permeability zones within the LTCU in the Tuff Pile area or within the LTCU in the Yucca Flat CAU-scale model. Both observational and analytical data clearly indicate that the LTCU in the Tuff Pile area consists of pervasively zeolitic, nonwelded to poorly welded tuffs that are classified as tuff confining units (i.e., high-porosity, low-permeability). The position regarding the LTCU in the Tuff Pile area is summarized as follows: • The LTCU in the Tuff Pile area consists of a monotonous sequence of predominantly zeolitic nonwelded to poorly welded tuffs, and thus is accurately characterized hydrogeologically as a tuff confining unit (aquitard) in the Yucca Flat-Climax Mine hydrostratigraphic framework model (Bechtel Nevada, 2006). • No welded-tuff (or lava-flow aquifers), referred to as low-porosity, high-permeability zones in Boryta et al. (in review), are present within the LTCU in the Tuff Pile area. • Fractures within the LTCU are poorly developed, a characteristic of zeolitic tuffs; and fracture distributions are independent of stratigraphic and lithologic units (Prothro, 2008). • Groundwater flow and radionuclide transport will not be affected by laterally extensive zones of significantly higher permeability within the LTCU in the Tuff Pile area. Although not the primary focus of this report, the hydrogeologic character of the Oak Spring Butte confining unit (OSBCU), located directly below the LTCU, is also discussed. The OSBCU is lithologically more diverse, and does include nonwelded to partially welded ash-flow tuffs. However, these older ash-flow tuffs are poorly welded and altered (zeolitic to quartzofeldspathic), and consequently, would tend to have properties similar to a tuff confining unit rather than a welded-tuff aquifer.

Sigmund L. Drellack, Jr., Lance B. Prothro, Jose L. Gonzales, and Jennifer M. Mercadante

2010-07-30T23:59:59.000Z

55

Burden distribution control for maintaining the central gas flow at No. 1 blast furnace in Pohang Works  

SciTech Connect (OSTI)

The causes for temperature lowering at the upper shaft center in Pohang No. 1 blast furnace were investigated. The test operation with charging notch change in the actual blast furnace and with a 1/12 scale model to Pohang No. 1 blast furnace were carried out in order to improve central gas flow in the shaft. Finally, rebuilding of the lower bunker interior was performed using the results of model experiments. It was confirmed that the main reason for the gas temperature lowering at the upper shaft center was the smaller particle size at center than the wall according to the discharging characteristics of center feed bunker with stone box. The central gas flow could be secured through modifying the stone box in the bunker.

Jung, S.K.; Lee, Y.J.; Suh, Y.K.; Ahn, T.J.; Kim, S.M. [Pohang Iron and Steel Co. Ltd. (Korea, Republic of). Technical Research Labs.

1995-12-01T23:59:59.000Z

56

Unclassified Source Term and Radionuclide Data for the Groundwater Flow and Contaminant Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada, Revision 0  

SciTech Connect (OSTI)

This report documents the evaluation of the information and data available on the unclassified source term and radionuclide contamination for Central and Western Pahute Mesa: Corrective Action Units (CAUs) 101 and 102.

McCord, John

2004-08-01T23:59:59.000Z

57

Fluid Flow, Thermal History, and Diagenesis of the Cambrian-Ordovician Arbuckle Group and Overlying Units in South-Central Kansas  

E-Print Network [OSTI]

through a Nikon SMZ800 microscope with support stand. In between samples, drill bits were cleared of residue with an air compressor, dipped in 10% HCl, and rinsed with alcohol to avoid cross contamination. Sixty-two calcite and baroque dolomite samples...) of south-central Kansas (Fig. 2.1A, 2.1B). It is believed to meet requirements for carbon dioxide (CO2) sequestration, including: seal integrity of confining units, brine chemistry, mineralogy, capability for high injectivity, capacity for long isolation...

King, Bradley Donald

2013-12-31T23:59:59.000Z

58

Effects of morphine and naloxone on evoked multuple-unit activity in the caudate nucleus and central grey of rats  

E-Print Network [OSTI]

increased NUA in the central grey 21 5. Changes in voltage thresholds due to placebo treatments 23 6. Changes in the voltage threshold of sciatic nerve stimulation needed to evoke increased MUA in the caudate nucleus 24 7. Changes in voltage threshold... more potent that codeine and is twenty times more concentrated in opium than is codeine (Goodman and Gilman, 1970). Opium was probably used by the Sumerians in Mesopotamia before AOOO B. C. and was mentioned in the writings of Theophrastus...

Palmer, Michael Rule

1976-01-01T23:59:59.000Z

59

Methanol production from Eucalyptus wood chips. Working Document 9. Economics of producing methanol from Eucalyptus in Central Florida  

SciTech Connect (OSTI)

A detailed feasibility study of producing methanol from Eucalyptus in Central Florida encompasses all phases of production - from seedling to delivery of finished methanol. The project includes the following components: (1) production of 55 million, high quality, Eucalyptus seedlings through tissue culture; (2) establishment of a Eucalyptus energy plantation on approximately 70,000 acres; and (3) engineering for a 100 million gallon-per-year methanol production facility. In addition, the potential environmental impacts of the whole project were examined, safety and health aspects of producing and using methanol were analyzed, and site specific cost estimates were made. The economics of the project are presented here. Each of the three major components of the project - tissue culture lab, energy plantation, and methanol refinery - are examined individually. In each case a site specific analysis of the potential return on investment was conducted.

Fishkind, H.H.

1982-06-01T23:59:59.000Z

60

Completion Report for Well ER-EC-13 Corrective Action Units 101 and 102: Central and Western Pahute Mesa  

SciTech Connect (OSTI)

Well ER-EC-13 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, in support of the Nevada Environmental Restoration Project at the Nevada National Security Site (formerly Nevada Test Site), Nye County, Nevada. The well was drilled in October 2010 as part of the Pahute Mesa Phase II drilling program. A main objective was to provide detailed hydrogeologic information for the Fortymile Canyon composite unit hydrostratigraphic unit in the Timber Mountain moat area, within the Timber Mountain caldera complex, that will help address uncertainties within the Pahute Mesa–Oasis Valley hydrostratigraphic framework model. This well may also be used as a long-term monitoring well.

NSTec Environmental Management

2011-05-31T23:59:59.000Z

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Completion Report for Well ER-20-4 Corrective Action Units 101 and 102: Central and Western Pahute Mesa  

SciTech Connect (OSTI)

Well ER-20-4 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada National Security Site, Nye County, Nevada. The well was drilled in August and September 2010 as part of the Pahute Mesa Phase II drilling program. The primary purpose of the well was to investigate the possibility of radionuclide transport from up-gradient underground nuclear tests conducted in central Pahute Mesa. This well also provided detailed hydrogeologic information in the Tertiary volcanic section that will help reduce uncertainties within the Pahute Mesa-Oasis Valley hydrostratigraphic framework model.

NSTec Environmental Management

2011-04-30T23:59:59.000Z

62

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan  

SciTech Connect (OSTI)

This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

D. E. Shanklin

2006-06-01T23:59:59.000Z

63

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada  

SciTech Connect (OSTI)

This report presents results of data collected during the annual post-closure site inspections conducted at the Central Nevada Test Area surface Corrective Action Unit (CAU) 417 in May 2011 and July 2012. The annual post-closure site inspections included inspections of the UC-1, UC-3, and UC-4 sites in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report (NNSA/NV 2001). The annual inspections conducted at the UC-1 Central Mud Pit (CMP) indicated that the site and soil cover were in good condition. No new fractures or extension of existing fractures were observed and no issues with the fence or gate were identified. The vegetation on the cover continues to look healthy, but the biennial vegetation survey conducted during the 2012 inspection indicated that the total foliar cover was slightly higher in 2009 than in 2012. This may be indicative of a decrease in precipitation observed during the 2-year monitoring period. The precipitation totaled 9.9 inches from July 1, 2010, through June 30, 2011, and 5 inches from July 1, 2011, through June 30, 2012. This decrease in precipitation is also evident in the soil moisture data obtained from the time domain reflectometry sensors. Soil moisture content data show that the UC-1 cover is performing as designed, and evapotranspiration is effectively removing water from the cover.

None

2013-03-01T23:59:59.000Z

64

POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 417: CENTRAL NEVADA TEST AREA - SURFACE, HOT CREEK VALLEY, NEVADA, FOR CALENDAR YEAR 2004  

SciTech Connect (OSTI)

This post-closure inspection and monitoring report has been prepared according to the stipulations laid out in the Closure Report (CR) for Corrective Action Unit (CAU) 417, Central Nevada Test Area (CNTA)--Surface (U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office [NNSA/NV], 2001), and the Federal Facility Agreement and Consent Order (FFACO, 1996). This report provides an analysis and summary of site inspections, subsidence surveys, meteorological information, and soil moisture monitoring data for CAU 417, which is located in Hot Creek Valley, Nye County, Nevada. This report covers Calendar Year 2004. Inspections at CAU 417 are conducted quarterly to document the physical condition of the UC-1, UC-3, and UC-4 soil covers, monuments, signs, fencing, and use restricted areas. The physical condition of fencing, monuments, and signs is noted, and any unusual conditions that could impact the integrity of the covers are reported. The objective of the soil moisture monitoring program is to monitor the stability of soil moisture conditions within the upper 1.2 meters (m) (4 feet [ft]) of the UC-1 Central Mud Pit (CMP) cover and detect changes that may be indicative of moisture movement exceeding the cover design performance expectations.

BECHTEL NEVADA; NNSA NEVADA SITE OFFICE

2005-04-01T23:59:59.000Z

65

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada For Calendar Year 2006  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 417, Central Nevada Test Area - Surface, is located in Hot Creek Valley in northern Nye County, Nevada, and consists of three areas commonly referred to as UC-1, UC-3, and UC-4. CAU 417 consists of 34 Corrective Action Sites (CASs) which were closed in 2000 (U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, 2001). Three CASs at UC-1 were closed in place with administrative controls. At CAS 58-09-01, Central Mud Pit (CMP), a vegetated soil cover was constructed over the mud pit. At the remaining two sites, CAS 58-09-02, Mud Pit, and CAS 58-09-05, Mud Pits (3), aboveground monuments and warning signs were installed to mark the CAS boundaries. Three CASs at UC-3 were closed in place with administrative controls. Aboveground monuments and warning signs were installed to mark the site boundaries at CAS 58-09-06, Mud Pits (5), CAS 58-25-01, Spill, and CAS 58-10-01, Shaker Pad Area. Two CASs that consist of five sites at UC-4 were closed in place with administrative controls. At CAS 58-09-03, Mud Pits (5), an engineered soil cover was constructed over Mud Pit C. At the remaining three sites in CAS 58-09-03 and at CAS 58-10-05, Shaker Pad Area, aboveground monuments and warning signs were installed to mark the site boundaries. The remaining 26 CASs at CAU 417 were either clean-closed or closed by taking no further action.

None

2007-06-01T23:59:59.000Z

66

Streamlined approach for environmental restoration work plan for Corrective Action Unit 126: Closure of aboveground storage tanks, Nevada Test Site, Nevada. Revision 1  

SciTech Connect (OSTI)

This plan addresses the closure of several aboveground storage tanks in Area 25 of the Nevada Test Site. The unit is currently identified as Corrective Action Unit 126 in the Federal Facility Agreement and Consent Order and is listed as having six Corrective Action Sites. This plan addresses the Streamlined Approach for Environmental Restoration closure for five of the six sites. Four of the CASs are located at the Engine Test Stand complex and one is located in the Central Support Area. The sites consist of aboveground tanks, two of which were used to store diesel fuel and one stored Nalcool (an antifreeze mixture). The remaining tanks were used as part of a water demineralization process and stored either sulfuric acid or sodium hydroxide, and one was used as a charcoal adsorption furnace. Closure will be completed by removal of the associated piping, tank supports and tanks using a front end loader, backhoe, and/or crane. When possible, the tanks will be salvaged as scrap metal. The piping that is not removed will be sealed using a cement grout.

NONE

1998-07-01T23:59:59.000Z

67

Race and the Working Class Past in the United States: Multiple Identities and the Future of Labor History.  

E-Print Network [OSTI]

. ihr eacmpMed much of the c k » consoouMKAv imkpcmktKv. ami » i l l t < p f i i to r t i i h n | t q w n a i t o i of M t u l i f generation of telephone i^crat«w% »*U d r c n h c d m S t e m Norwoods ( j t o r ' i FUmung Youth * Through it*«M «il her... to rewrite working class history were profoundly influenced by DuBois and. to a lesser extent, by the Black Trinidadian historian C.L.R. James. Herbert Gutman set out a research agenda which, as Ira Berlin has written, made "study of the Afro-American family...

Roediger, David

1993-12-01T23:59:59.000Z

68

Analysis of the working process and mechanical losses in a Stirling engine for a solar power unit  

SciTech Connect (OSTI)

In this paper a second level mathematical model for the computational simulation of the working process of a 1-kW Stirling engine has been used and the results obtained are presented. The internal circuit of the engine in the calculation scheme was divided into five chambers, namely, the expansion space, heater, regenerator, cooler and the compression space, and the governing system of ordinary differential equations for the energy and mass conservation were solved in each chamber by Euler`s method. In addition, mechanical losses in the construction of the engine have been determined and the computational results show that the mechanical losses for this particular design of the Stirling engine may be up to 50% of the indicated power of the engine.

Makhkamov, K.K. [Uzbek Academy of Sciences, Tashkent (Uzbekistan). Physical and Technical Inst.; Ingham, D.B. [Univ. of Leeds (United Kingdom). Dept. of Applied Mathematics

1999-05-01T23:59:59.000Z

69

Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the nature and extent of contamination is presented in Section 1.2, and the results of the BRA are summarized in Section 1.3. The objective of this FS is discussed in Section 1.4, and preliminary remediation goals are identified in Section 1.5. The organization of the remaining chapters of this FS is outlined in Section 1.6.

NONE

1999-07-15T23:59:59.000Z

70

Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.

NONE

1999-07-15T23:59:59.000Z

71

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV  

SciTech Connect (OSTI)

This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

R. P. Wells

2006-11-14T23:59:59.000Z

72

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Fuels Used and End Uses in Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

73

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Computers and Other Electronics in Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

74

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

9 Air Conditioning in Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

75

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Water Heating in U.S. Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

76

Stanford University Occupational Health Center Protecting Your Health and Safety at Work Central to supporting and promoting a culture of safety at Stanford is the Stanford University Occupational Health  

E-Print Network [OSTI]

to supporting and promoting a culture of safety at Stanford is the Stanford University OccupationalStanford University Occupational Health Center Protecting Your Health and Safety at Work Central Health Center (SUOHC). The SUOHC is part of the Office of Environmental Health & Safety and has two

Kay, Mark A.

77

Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

Not Available

1993-09-01T23:59:59.000Z

78

Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODs) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regimes, which are labeled as integrator OUs. This remedial investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the feasibility study to evaluate all probable or likely alternatives.

Not Available

1993-07-01T23:59:59.000Z

79

Work plan for the remedial investigation/feasibility study-environmental assessment for the quarry residuals operable unit at the Weldon Spring Site  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. The Weldon Spring site consists of two noncontiguous areas -- the chemical plant area, which includes four raffinate pits, and the quarry. Cleanup activities at the Weldon Spring site are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, incorporating the values of the National Environmental Policy Act (NEPA). The contents of the documents prepared for the project are not intended to represent a statement regarding the legal applicability of NEPA to remedial actions conducted under CERCLA. In accordance with the integrated CERCLA/NEPA approach, a remedial investigation/feasibility study-environmental assessment (RI/FS-EA) is being conducted to evaluate conditions and potential responses for the quarry residuals operable unit (QROU). This operable unit consists of the following areas and/or media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and bulk waste; underlying groundwater; and other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough. This work plan identifies the activities within the RI/FS-EA process that are being proposed to address contamination remaining at the quarry area.

Not Available

1994-01-01T23:59:59.000Z

80

Distributed trace using central performance counter memory  

DOE Patents [OSTI]

A plurality of processing cores, are central storage unit having at least memory connected in a daisy chain manner, forming a daisy chain ring layout on an integrated chip. At least one of the plurality of processing cores places trace data on the daisy chain connection for transmitting the trace data to the central storage unit, and the central storage unit detects the trace data and stores the trace data in the memory co-located in with the central storage unit.

Satterfield, David L; Sexton, James C

2013-10-22T23:59:59.000Z

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Distributed trace using central performance counter memory  

DOE Patents [OSTI]

A plurality of processing cores, are central storage unit having at least memory connected in a daisy chain manner, forming a daisy chain ring layout on an integrated chip. At least one of the plurality of processing cores places trace data on the daisy chain connection for transmitting the trace data to the central storage unit, and the central storage unit detects the trace data and stores the trace data in the memory co-located in with the central storage unit.

Satterfield, David L.; Sexton, James C.

2013-01-22T23:59:59.000Z

82

POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 417: CENTRAL NEVADA TEST AREA - SURFACE, HOT CREEK VALLEY, NEVADA; FOR CALENDAR YEAR 2005  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 417, Central Nevada Test Area - Surface, is located in Hot Creek Valley in northern Nye County, Nevada, and consists of three areas commonly referred to as UC-1, UC-3, and UC-4. CAU 417 consists of 34 Corrective Action Sites (CASs) which were closed in 2000 (U. S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, 2001). Three CASs at UC-1 were closed in place with administrative controls. At CAS 58-09-01, Central Mud Pit (CMP), a vegetated soil cover was constructed over the mud pit. At the remaining two sites CAS 58-09-02, Mud Pit and 58-09-05, Mud Pits (3), aboveground monuments and warning signs were installed to mark the CAS boundaries. Three CASs at UC-3 were closed in place with administrative controls. Aboveground monuments and warning signs were installed to mark the site boundaries at CAS 58-09-06, Mud Pits (5), CAS 58-25-01, Spill and CAS 58-10-01, Shaker Pad Area. Two CASs that consist of five sites at UC-4 were closed in place with administrative controls. At CAS 58-09-03, Mud Pits 9, an engineered soil cover was constructed over Mud Pit C. At the remaining three sites in CAS 58-09-03 and at CAS 58-10-05, Shaker Pad Area, aboveground monuments and warning signs were installed to mark the site boundaries. The remaining 26 CASs at CAU 417 were either clean-closed or closed by taking no further action. Quarterly post-closure inspections are performed at the CASs that were closed in place at UC-I, UC-3, and UC-4. During calendar year 2005, site inspections were performed on March 15, June 16, September 22, and December 7. The inspections conducted at the UC-1 CMP documented that the site was in good condition and continued to show integrity of the cover unit. No new cracks or fractures were observed until the December inspection. A crack on the west portion of the cover showed evidence of lateral expansion; however, it is not at an actionable level. The crack will be sealed by filling with bentonite during the first quarter of 2006 and monitored during subsequent inspections. The cover vegetation was healthy and well established. No issues were identified with the CMP fence, gate, or subsidence monuments. No issues were identified with the warning signs and monuments at the other two UC-1 locations. The inspections at UC-3 indicated that the sites are in excellent condition. All monuments and signs showed no displacement, damage, or removal. A small erosion gully from spring rain runoff was observed during the June inspection, but it did not grow to an actionable level during 2005. No other issues or concerns were identified. Inspections performed at UC-4 Mud Pit C cover revealed that erosion rills were formed during March and September exposing the geosynthetic clay liner. Both erosion rills were repaired within 90 days of reporting. Sparse vegetation is present on the cover. The overall condition of the monuments, fence, and gate are in good condition. No issues were identified with the warning signs and monuments at the other four UC-4 locations. Subsidence surveys were conducted at UC-1 CMP and UC-4 Mud Pit C in March and September of 2005. The results of the subsidence surveys indicate that the covers are performing as expected, and no unusual subsidence was observed. The June vegetation survey of the UC-1 CMP cover and adjacent areas indicated that the revegetation has been very successful. The vegetation should continue to be monitored to document any changes in the plant community and identify conditions that could potentially require remedial action in order to maintain a viable vegetative cover on the site. Vegetation surveys should be conducted only as required. Precipitation during 2005 was above average, with an annual rainfall total of 21.79 centimeters (8.58 inches). Soil moisture content data show that the UC-1 CMP cover is performing as designed, with evapotranspiration effectively removing water from the cover. It is recommended to continue quarterly site inspections and the collection of soil moisture data for the UC-1 CMP cove

NONE

2006-04-01T23:59:59.000Z

83

Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect (OSTI)

Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

Not Available

1993-08-01T23:59:59.000Z

84

Depositional sequences and integrated recovery efficiency forecast models for San Andres and Clearfork Units in the Central Basin Platform and the Northern Shelf, west Texas  

E-Print Network [OSTI]

models of primary, initial waterflood and infill drilling are developed for the San Andres and Clearfork reservoirs in Central Basin Platform and the Northern Shelf, west Texas. The geological parameters and well spacing are considered major factors...

Shao, Hongbin

1994-01-01T23:59:59.000Z

85

TRU waste inventory collection and work off plans for the centralization of TRU waste characterization/certification at INL - on your mark - get set - 9410  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) amended the Record of Decision (ROD) for the Waste Management Program: Treatment and Storage of Transuranic Waste to centralize transuranic (TRU) waste characterization/certification from fourteen TRU waste sites. This centralization will allow for treatment, characterization and certification ofTRU waste from the fourteen sites, thirteen of which are sites with small quantities ofTRU waste, at the Idaho National Laboratory (INL) prior to shipping the waste to the Waste Isolation Pilot Plant (WIPP) for disposal. Centralization of this TRU waste will avoid the cost of building treatment, characterization, certification, and shipping capabilities at each of the small quantity sites that currently do not have existing facilities. Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Nuclear Technology and Engineering Center (INTEC) will provide centralized shipping facilities, to WIPP, for all of the small quantity sites. Hanford, the one large quantity site identified in the ROD, has a large number of waste in containers that are overpacked into larger containers which are inefficient for shipment to and disposal at WIPP. The AMWTF at the INL will reduce the volume of much of the CH waste and make it much more efficient to ship and dispose of at WIPP. In addition, the INTEC has a certified remote handled (RH) TRU waste characterization/certification program at INL to disposition TRU waste from the sites identified in the ROD.

Mctaggert, Jerri Lynne [Los Alamos National Laboratory; Lott, Sheila A [Los Alamos National Laboratory; Gadbury, Casey [CBFO

2008-01-01T23:59:59.000Z

86

TRU waste inventory collection and work-off plans for the centralization of TRU waste characterization at INL - on your mark - get set - 9410  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) amended the Record of Decision (ROD) for the Waste Management Program: Treatment and Storage ofTransuranic Waste to centralize transuranic (TRU) waste characterization/certification from fourteen TRU waste sites. This centralization will allow for treatment, characterization and certification ofTRU waste from the fourteen sites, thirteen of which are sites with small quantities ofTRU waste, at the Idaho National Laboratory (INL) prior to shipping the waste to the Waste Isolation Pilot Plant (WIPP) for disposal. Centralization ofthis TRU waste will avoid the cost ofbuilding treatment, characterization, certification, and shipping capabilities at each ofthe small quantity sites that currently do not have existing facilities. Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Nuclear Technology and Engineering Center (INTEC) will provide centralized shipping facilities, to WIPP, for all ofthe small quantity sites. Hanford, the one large quantity site identified in the ROD, has a large number ofwaste in containers that are overpacked into larger containers which are inefficient for shipment to and disposal at WIPP. The AMWTP at the INL will reduce the volume ofmuch of the CH waste and make it much more efficient to ship and dispose of at WIPP. In addition, the INTEC has a certified remote handled (RH) TRU waste characterization/certification program at INL to disposition TRU waste from the sites identified in the ROD.

Mctaggert, Jerri Lynne [Los Alamos National Laboratory; Lott, Sheila [Los Alamos National Laboratory; Gadbury, Casey [CBFO

2009-01-01T23:59:59.000Z

87

September 16, 2008; HSS/Union Working Group Meeting, Former Worker and Energy Compensation Programs, CAIRS Reporting, Central Worker Data Tracking - Information Package  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the Americas |DOE Former Worker/Energy Compensation CAIRS Central

88

September 16, 2008; HSS/Union Working Group Meeting, Former Worker and Energy Compensation Programs, CAIRS Reporting, Central Worker Data Tracking Â… Meeting Summary  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the Americas |DOE Former Worker/Energy Compensation CAIRS CentralPage

89

Phase II Corrective Action Investigation Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada Test Site, Nye County, Nevada, Revision 2  

SciTech Connect (OSTI)

This Phase II CAIP describes new work needed to potentially reduce uncertainty and achieve increased confidence in modeling results. This work includes data collection and data analysis to refine model assumptions, improve conceptual models of flow and transport in a complex hydrogeologic setting, and reduce parametric and structural uncertainty. The work was prioritized based on the potential to reduce model uncertainty and achieve an acceptable level of confidence in the model predictions for flow and transport, leading to model acceptance by NDEP and completion of the Phase II CAI stage of the UGTA strategy.

Jeff Wurtz

2009-07-01T23:59:59.000Z

90

East Central Energy- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

East Central Energy (ECE) provides rebates for residential customers to purchase energy efficient equipment. Rebates are offered for recycled refrigerators/freezers, central air conditioning units,...

91

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

92

Using the central VAX cluster at ANL  

SciTech Connect (OSTI)

This report is a manual that discusses the following topics on the Central Vax Cluster at ANL: What the Central Vax Cluster is; how the Vax Cluster works; operational policies; getting started; using tapes; printing on the Vax Cluster; developing programs in VMS; using the X window system on the Central Vax Cluster; and using Central Vax Cluster file sharing services.

Caruthers, C.M.; Vote, S.L. [eds.; Lifka, D.A.; Raffenetti, R.C.

1992-08-01T23:59:59.000Z

93

Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This document outlines the activities necessary to conduct a Remedial Investigation (RI) of the Chestnut Ridge Security Pits (CRSP) at the Oak Ridge Y-12 Plant. The CRSP, also designated Chestnut Ridge Operable Unit (OU) 1, is one of four OUs along Chestnut Ridge on the Oak Ridge Reservation (ORR). The purpose of the RI is to collect data to (1) evaluate the nature and extent of known and suspected contaminants, (2) support an Ecological Risk Assessment (ERA) and a Human Health Risk Assessment (HHRA), (3) support the feasibility study in the development and analysis of remedial alternatives, and (4) ultimately, develop a Record of Decision (ROD) for the site. This chapter summarizes the regulatory background of environmental investigation on the ORR and the approach currently being followed and provides an overview of the RI to be conducted at the CRSP. Subsequent chapters provide details on site history, sampling activities, procedures and methods, quality assurance (QA), health and safety, and waste management related to the RI.

Not Available

1994-03-01T23:59:59.000Z

94

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

lectricity",38.1,5.6,13.6,4.1,12.4,2.5 "Central Warm-Air Furnace",19.1,1.8,6.5,2.2,8,0.6 "Heat Pump",9.8,0.8,4.7,0.9,3,0.4 "Built-In Electric Units",5.7,2.4,1.6,0.3,0.2,1.2...

95

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electricity",38.1,20,2.1,3.3,8.9,3.9 "Central Warm-Air Furnace",19.1,9.6,1,1.5,4.9,2 "Heat Pump",9.8,7,0.7,0.2,0.9,0.9 "Built-In Electric Units",5.7,1.9,0.3,1.1,2.3,"Q"...

96

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electricity",38.1,2.4,4.6,24.2,7 "Central Warm-Air Furnace",19.1,0.3,2.3,13.7,2.9 "Heat Pump",9.8,0.4,0.6,7.5,1.3 "Built-In Electric Units",5.7,1.4,1.4,1.2,1.7 "Portable...

97

Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect (OSTI)

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

Not Available

1993-05-01T23:59:59.000Z

98

Termination unit  

SciTech Connect (OSTI)

This invention relates to a termination unit comprising an end-section of a cable. The end section of the cable defines a central longitudinal axis and comprising end-parts of N electrical phases, an end-part of a neutral conductor and a surrounding thermally insulation envelope adapted to comprising a cooling fluid. The end-parts of the N electrical phases and the end-part of the neutral conductor each comprising at least one electrical conductor and being arranged in the cable concentrically around a core former with a phase 1 located relatively innermost, and phase N relatively outermost in the cable, phase N being surrounded by the neutral conductor, electrical insulation being arrange between neighboring electrical phases and between phase N and the neutral conductor, and wherein the end-parts of the neutral conductor and the electrical phases each comprise a contacting surface electrically connected to at least one branch current lead to provide an electrical connection: The contacting surfaces each having a longitudinal extension, and being located sequentially along the longitudinal extension of the end-section of the cable. The branch current leads being individually insulated from said thermally insulation envelope by individual electrical insulators.

Traeholt, Chresten [Frederiksberg, DK; Willen, Dag [Klagshamn, SE; Roden, Mark [Newnan, GA; Tolbert, Jerry C [Carrollton, GA; Lindsay, David [Carrollton, GA; Fisher, Paul W [Heiskell, TN; Nielsen, Carsten Thidemann [Jaegerspris, DK

2014-01-07T23:59:59.000Z

99

Renewable Electricity Futures for the United States  

SciTech Connect (OSTI)

This paper highlights the key results from the Renewable Electricity (RE) Futures Study. It is a detailed consideration of renewable electricity in the United States. The paper focuses on technical issues related to the operability of the U. S. electricity grid and provides initial answers to important questions about the integration of high penetrations of renewable electricity technologies from a national perspective. The results indicate that the future U. S. electricity system that is largely powered by renewable sources is possible and the further work is warranted to investigate this clean generation pathway. The central conclusion of the analysis is that renewable electricity generation from technologies that are commercially available today, in combination with a more flexible electric system, is more than adequate to supply 80% of the total U. S. electricity generation in 2050 while meeting electricity demand on an hourly basis in every region of the United States.

Mai, Trieu; Hand, Maureen; Baldwin, Sam F.; Wiser , Ryan; Brinkman, G.; Denholm, Paul; Arent, Doug; Porro, Gian; Sandor, Debra; Hostick, Donna J.; Milligan, Michael; DeMeo, Ed; Bazilian, Morgan

2014-04-14T23:59:59.000Z

100

ICDF Complex Remedial Action Work Plan  

SciTech Connect (OSTI)

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Implementation of the El Mar (Delaware) Unit CO2 flood  

SciTech Connect (OSTI)

Union Royalty, Inc., Amoco Production Company, and Enron Liquids Pipeline Company recently announced that they have commenced operations of an innovative enhanced oil recovery project at the El Mar (Delaware) Unit in Loving County, Texas, about 100 miles west of Midland, Texas. The project will convert the unit`s existing oil recovery system from a secondary (waterflood) system to a tertiary (CO2 flood) system designed to use carbon dioxide and water to increase crude oil production from the unit. What makes this EOR project unique is the creative deal structured by the partners involved. Amoco, Union Royalty, and Enron have worked out an unprecedented arrangement whereby Amoco essentially trades CO2 for an interest in Union Royalty`s future oil production from the unit. By pioneering this innovative deal new production life has been restored to a field that otherwise might dry up. Enron is participating in the project by transporting CO2 to the unit via a 40-mile expansion of its Central Basin Pipeline system from the Dollarhide oil field in Andrews county, Texas. The project will be implemented in four phases. The first phase in operation today comprises seven CO2 injection wells which have begun to process the reservoir with CO2. Plans now call for more CO2 injectors to be installed during the next three to five years until a total of 65 CO2 injectors and an on-site CO2 compression facility serve the unit`s 70 production wells.

McKnight, T.N. Jr. [Union Royalty, Inc., Midland, TX (United States); Merchant, D.L.

1995-12-31T23:59:59.000Z

102

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

.1,0.9,2.6,3.8,7,7.8,7.1,6.8 "Central Warm-Air Furnace",19.1,0.6,0.3,1,1.6,3.5,4,3.8,4.3 "Heat Pump",9.8,0.4,0.2,0.5,0.7,1.6,2,2.2,2.2 "Built-In Electric Units",5.7,0.7,0.2,0.5,0.9...

103

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

.2,7.1,4.4,2.6,1.3,3,6.8 "Central Warm-Air Furnace",19.1,4.6,5.5,3.6,2.2,1.2,0.6,1.4,3.5 "Heat Pump",9.8,1.4,2,2,1.4,1,0.6,1.3,0.9 "Built-In Electric Units",5.7,1.9,1.6,0.9,0.6,0.3...

104

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

.4,0.4,0.3,0.2,2,0.5,1.3,0.1 "Central Warm-Air Furnace",19.1,0.3,0,0,"Q",0.2,0.1,"Q","Q" "Heat Pump",9.8,0.4,"Q","Q","N",0.4,"Q",0.4,"N" "Built-In Electric Units",5.7,1.4,0.3,0.2,0...

105

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

ctricity",38.1,11.7,11.7,5.9,5.1,3.8 "Central Warm-Air Furnace",19.1,5.6,5.5,3.2,2.7,2.2 "Heat Pump",9.8,2.5,3.7,1.6,1.3,0.7 "Built-In Electric Units",5.7,2.4,1.7,0.6,0.7,0.4...

106

H. R. 3113: an act providing for the coordinated operation of the Central Valley project and the State water project in California. Introduced in the Senate of the United States, Ninety-Ninth Congress, Second Session, March 25, 1985  

SciTech Connect (OSTI)

The House Committee on Energy and Natural Resources rewrote the Bill coordinating operations of the Central Valley Project in California and the state water project, and limited the Secretary of the Interior to no more than 75% of the Central Valley Project's annual yield. The Bill specifies procedures for water delivery contracts and reimbursements. Title II deals with the preservation of the Suisin Marsh District; Title III with the reclamation of small projects; and Title IV with contract validation. The document contains both the original and the amended wording of H.R. 3113.

Not Available

1986-01-01T23:59:59.000Z

107

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

193 UNIT NUMBER: 197 UNIT NAME: CONCRETE RUBBLE PILE (30) REGULATORY STATUS: AOC LOCATION: Outside plant security fence, north of the plant on Big Bayou Creek on private property....

108

Fermilab: Science at Work  

ScienceCinema (OSTI)

Six days. Three frontiers. One amazing lab. From 2010 to 2012, a film crew followed a group of scientists at the Department of Energy's Fermilab and filmed them at work and at home. This 40-minute documentary shows the diversity of the people, research and work at Fermilab. Viewers catch a true behind-the-scenes look of the United States' premier particle physics laboratory while scientists explain why their research is important to them and the world.

Brendan Casey; Herman White; Craig Hogan; Denton Morris; Mary Convery; Bonnie Fleming; Deborah Harris; Dave Schmitz; Brenna Flaugher; Aron Soha

2013-02-14T23:59:59.000Z

109

Fermilab: Science at Work  

SciTech Connect (OSTI)

Six days. Three frontiers. One amazing lab. From 2010 to 2012, a film crew followed a group of scientists at the Department of Energy's Fermilab and filmed them at work and at home. This 40-minute documentary shows the diversity of the people, research and work at Fermilab. Viewers catch a true behind-the-scenes look of the United States' premier particle physics laboratory while scientists explain why their research is important to them and the world.

Brendan Casey; Herman White; Craig Hogan; Denton Morris; Mary Convery; Bonnie Fleming; Deborah Harris; Dave Schmitz; Brenna Flaugher; Aron Soha

2013-02-01T23:59:59.000Z

110

Centralized maintenance procedures  

SciTech Connect (OSTI)

In 1989, shortly after Westinghouse Hanford Company (WHC) assumed maintenance responsibilities for the Hanford site, a Department of Energy (DOE) maintenance audit found that field (working level) maintenance procedures and procedure practices of the facilities scattered across Hanford`s 560 square miles varied as greatly as the locations of those facilities. In some of the audited facilities there were few or no procedures; in others, procedures conflicted with or were redundant to procedures at other facilities. This document presents current efforts to centralize maintenance procedures.

Barber, J.R.

1994-02-01T23:59:59.000Z

111

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 UNIT NAME C-611 Underaround Diesel Tank REGULATORY STATUS: AOC LOCATION: Immediately southeast of C-611 APPROXIMATE DIMENSIONS: 1000 gallon FUNCTION: Diesel storage OPERATIONAL...

112

Designating marine protected areas in the United States and Ecuador: understanding the decision-making process  

E-Print Network [OSTI]

are central federal agencies and field bureaucracies, producer interests, consumer interests and occasionally Congress. Examples of producer interests in marine policy would be commercial fisheries, and the hydrocarbon industry. Examples of consumer... of the requirements for the degree of MASTER OF SCIENCE May 1991 Major Subject: Wildlife and Fisheries Sciences DESIGNATING MARINE PROTECTED AREAS IN THE UNITED STATES AND ECUADOR: UNDERSTANDING THE DECISION-MAKING PROCESS A Thesis by AMRIT WORK KENDRICK A...

Kendrick, Amrit Work

1991-01-01T23:59:59.000Z

113

Phase II Corrective Action Investigation Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada Test Site, Nye County, Nevada, Revision 2 with ROTC 1 and 2  

SciTech Connect (OSTI)

This Phase II CAIP describes new work needed to potentially reduce uncertainty and achieve increased confidence in modeling results. This work includes data collection and data analysis to refine model assumptions, improve conceptual models of flow and transport in a complex hydrogeologic setting, and reduce parametric and structural uncertainty. The work was prioritized based on the potential to reduce model uncertainty and achieve an acceptable level of confidence in the model predictions for flow and transport, leading to model acceptance by NDEP and completion of the Phase II CAI stage of the UGTA strategy.

Marutzky, Sam

2009-07-01T23:59:59.000Z

114

SECTION 593 WRDA 1999, AS AMENDED CENTRAL NEW MEXICO  

E-Print Network [OSTI]

SECTION 593 ­ WRDA 1999, AS AMENDED CENTRAL NEW MEXICO MODEL AGREEMENT FOR DESIGN ASSISTANCE (WORK developed for providing environmental assistance to non-Federal interests in central New Mexico pursuant

US Army Corps of Engineers

115

United States of Agriculture  

E-Print Network [OSTI]

in wildlife management from the University of New Hampshire in 1988. She joined the Intermountain Research Station in 1993 after working for the States of New Hampshire and Wyoming on projects involving wetlandUnited States Department of Agriculture Forest Service Intermountain Research Station General

116

Voltage verification unit  

DOE Patents [OSTI]

A voltage verification unit and method for determining the absence of potentially dangerous potentials within a power supply enclosure without Mode 2 work is disclosed. With this device and method, a qualified worker, following a relatively simple protocol that involves a function test (hot, cold, hot) of the voltage verification unit before Lock Out/Tag Out and, and once the Lock Out/Tag Out is completed, testing or "trying" by simply reading a display on the voltage verification unit can be accomplished without exposure of the operator to the interior of the voltage supply enclosure. According to a preferred embodiment, the voltage verification unit includes test leads to allow diagnostics with other meters, without the necessity of accessing potentially dangerous bus bars or the like.

Martin, Edward J. (Virginia Beach, VA)

2008-01-15T23:59:59.000Z

117

INL's '@work' Scientific Glassblower  

SciTech Connect (OSTI)

INL's '@work' segments feature INL employees and the jobs they perform. This edition features INL's Russell Lewis, a skilled glassblower. Learn more at http://www.facebook.com/idahonationallaboratory. Prepared by Battelle Energy Alliance, LLC under Contract NO.DE-AC07-05ID14517 with the U.S. Department of Energy. The United States Government retains a nonexclusive paid-up, irrevocable, world-wide license to publish or reproduce this video, or allow others to do so, for United States Government Purposes.

Lewis, Russel

2008-01-01T23:59:59.000Z

118

Working Paper  

E-Print Network [OSTI]

Jul 2, 2010 ... Working Paper. Branch and Bound Algorithms for ...... interest when evaluating the performance. First, each derived subproblem means usage ...

2010-07-16T23:59:59.000Z

119

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 UNIT NAME C-632-8 Sulfuric Acid Storaqe TaD REGULATORY STATUS CERCLA LOCATION Southwest of C-631 coolin location 76 APPROXIMATE DIMENSIONS 5000 Qal - FUNCTION Sulfuric acid...

120

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 C-750B Diesel UST UNIT NAME REGULATORY STATUS: AOC LOCATION: Southeast corner of C-750 APPROXIMATE DIMENSIONS: 10,000 gallon FUNCTION: Diesel storage OPERATIONAL STATUS: Removed...

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 UNIT NAME C-633 PCB So111 Site REGULATORY STATUS CERCLA LOCATION C-633 Transformer area (Mac location 75) APPROXIMATE DIMENSIONS I Unknown FUNCTION Soill site OPERATIONAL STATUS...

122

PLANNING UNIT October 26, 2009  

E-Print Network [OSTI]

PLANNING UNIT October 26, 2009 Advertisement for TRIPP Chair in the Institute A large number research work in the area of Transportation Planning for control of accidents and pollution with special

Prasad, Sanjiva

123

Phase I Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada Test Site, Nye County, Nevada with Errata Sheet 1, 2, 3, Revision 1  

SciTech Connect (OSTI)

As prescribed in the Pahute Mesa Corrective Action Investigation Plan (CAIP) (DOE/NV, 1999) and Appendix VI of the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended February 2008), the ultimate goal of transport analysis is to develop stochastic predictions of a contaminant boundary at a specified level of uncertainty. However, because of the significant uncertainty of the model results, the primary goal of this report was modified through mutual agreement between the DOE and the State of Nevada to assess the primary model components that contribute to this uncertainty and to postpone defining the contaminant boundary until additional model refinement is completed. Therefore, the role of this analysis has been to understand the behavior of radionuclide migration in the Pahute Mesa (PM) Corrective Action Unit (CAU) model and to define, both qualitatively and quantitatively, the sensitivity of such behavior to (flow) model conceptualization and (flow and transport) parameterization.

Greg Ruskauff

2009-02-01T23:59:59.000Z

124

Accelerating the Fourier split operator method via graphics processing units  

E-Print Network [OSTI]

Current generations of graphics processing units have turned into highly parallel devices with general computing capabilities. Thus, graphics processing units may be utilized, for example, to solve time dependent partial differential equations by the Fourier split operator method. In this contribution, we demonstrate that graphics processing units are capable to calculate fast Fourier transforms much more efficiently than traditional central processing units. Thus, graphics processing units render efficient implementations of the Fourier split operator method possible. Performance gains of more than an order of magnitude as compared to implementations for traditional central processing units are reached in the solution of the time dependent Schr\\"odinger equation and the time dependent Dirac equation.

Heiko Bauke; Christoph H. Keitel

2010-12-17T23:59:59.000Z

125

This paper is declared a work of the U.S. Government and is not subject to copyright protection in the United States. COMPOSITE MATERIALS FATIGUE ISSUES IN WIND  

E-Print Network [OSTI]

in the United States. COMPOSITE MATERIALS FATIGUE ISSUES IN WIND TURBINE BLADE CONSTRUCTION John F. Mandell requirements of stiffness, strength, and ease of processing, wind blade materials must withstand severe fatigue studies of composite laminates of interest for wind turbine blade construction. In addition to the primary

126

Energy infrastructure of the United States and projected siting needs: Scoping ideas, identifying issues and options. Draft report of the Department of Energy Working Group on Energy Facility Siting to the Secretary  

SciTech Connect (OSTI)

A Department of Energy (DOE) Working Group on Energy Facility Siting, chaired by the Policy Office with membership from the major program and staff offices of the Department, reviewed data regarding energy service needs, infrastructure requirements, and constraints to siting. The Working Group found that the expeditious siting of energy facilities has important economic, energy, and environmental implications for key Administration priorities.

Not Available

1993-12-01T23:59:59.000Z

127

Going To Work: Work Relationships  

E-Print Network [OSTI]

One of a worker's top goals should be to develop good relationships with coworkers and supervisers. This publication discusses five general rules for building good relationships at work and offers advice on handling criticism....

Hoffman, Rosemarie

2000-07-20T23:59:59.000Z

128

Central collisions of heavy ions  

SciTech Connect (OSTI)

This report describes the activities of the Heavy Ion Physics Group at the University of California, Riverside from October 1, 1991 to September 30, 1992. During this period, the program focused on particle production at AGS energies, and correlation studies at the Bevalac in nucleus-nucleus central collisions. As part of the PHENIX collaboration, contributions were made to the Preliminary Conceptual Design Report (pCDR), and work on a RHIC silicon microstrip detector R D project was performed.

Fung, Sun-yiu.

1992-10-01T23:59:59.000Z

129

If someone were to have told me 13 years ago, just when I had moved to the United States from Colombia, that I was going to live and work in China during college, I would have not believed them.  

E-Print Network [OSTI]

with regards to the backgrounds and identities of others (given America's multicultural population), nothing nervous and more conscious of the norms. I took my friend's advice and purchased a bike to ride to work

Shepard, Kenneth

130

Work Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and MaterialsWenjun1 Table 1.14 Sales of4) MonthlyWork &Work

131

Working Copy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption byAbout PrintableBlenderWhatFellowsWood and4213WorkWork

132

Wind Shear Characteristics at Central Plains Tall Towers: Preprint  

SciTech Connect (OSTI)

Conference paper for WindPower 2006 held June 4-7, 2006, in Pittsburgh, PA, describing the wind shear characteristics at tall tower sites in the Central Plains of the United States.

Schwartz, M.; Elliott, D.

2006-06-01T23:59:59.000Z

133

Central New Mexico Community College Catalog Year 2009-2011  

E-Print Network [OSTI]

2011 Central New Mexico Community College Catalog Year 2009-2011 5/31/2011 Transferring from Central New Mexico Community College to the University of New Mexico #12;CNM Course UNM Equivalent://advisement.unm.edu/ The University of New Mexico and Central New Mexico Community College work closely to ease your transition from

New Mexico, University of

134

Fermilab at Work | Work Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibility ofSmall Works:OklahomaatWayneFermilab NowLab LifeWork

135

FINAL FRONTIER AT HANFORD TACKLING THE CENTRAL PLATEAU  

SciTech Connect (OSTI)

The large land area in the center of the vast Department of Energy (DOE) Hanford Site in southeast Washington State is known as 'the plateau'--aptly named because its surface elevations are 250-300 feet above the groundwater table. By contrast, areas on the 585-square mile Site that border the Columbia River sit just 30-80 feet above the water table. The Central Plateau, which covers an ellipse of approximately 70 square miles, contains Hanford's radiochemical reprocessing areas--the 200 East and 200 West Areas--and includes the most highly radioactive waste and contaminated facilities on the Site. Five 'canyons' where chemical processes were used to separate out plutonium (Pu), 884 identified soil waste sites (including approximately 50 miles of solid waste burial trenches), more than 900 structures, and all of Hanford's liquid waste storage tanks reside in the Central Plateau. (Notes: Canyons is a nickname given by Hanford workers to the chemical reprocessing facilities. The 177, underground waste tanks at Hanford comprise a separate work scope and are not under Fluor's management). Fluor Hanford, a DOE prime cleanup contractor at the Site for the past 12 years, has moved aggressively to investigate Central Plateau waste sites in the last few years, digging more than 500 boreholes, test pits, direct soil 'pushes' or drive points; logging geophysical data sets; and performing electrical-resistivity scans (a non-intrusive technique that maps patterns of sub-surface soil conductivity). The goal is to identify areas of contamination areas in soil and solid waste sites, so that cost-effective and appropriate decisions on remediation can be made. In 2007, Fluor developed a new work plan for DOE that added 238 soil waste-site characterization activities in the Central Plateau during fiscal years (FYs) 2007-2010. This number represents a 50 percent increase over similar work previously done in central Hanford. Work Plans are among the required steps in the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) cleanup process. The CERCLA process is used to oversee the investigation, decision-making and remediation of 'past practices' (historical) sites, as opposed to sites in active use. For the first several years of Hanford's cleanup work, everyone concerned--the Department, contractors, regulatory agencies, stakeholders and Indian nations and tribes--focused efforts on the rivershore. The magnificent Columbia River--eighth largest in the world--flows through and by the Hanford Site for 52 miles. Two million people live downstream from Hanford along the Columbia before it empties into the Pacific Ocean. Further, the part of the river known as the 'Hanford Reach' is a prime habitat for salmon, steelhead, sturgeon and other species of fish. In fact, it provides a spawning ground to more salmon than any other stretch of river in the United States outside of Alaska. For these reasons, protecting the Columbia by cleaning up waste directly along its shoreline was an early priority in Hanford's Federal Facility Agreement and Consent Order (or Tri-Party Agreement) signed in 1989 among the DOE, U.S. Environmental Protection Agency (EPA) and Washington State to govern cleanup. However, Tri-Party Agreement signatories and others concerned with Hanford and the Columbia River, knew that the waste located in, and beneath, the Central Plateau could also pose dangers to the waterway. While the waste in central Hanford might move more slowly, and pose fewer immediate threats, it would have to be dealt with as cleanup progressed.

GERBER MS

2008-03-04T23:59:59.000Z

136

Performance of VAV Fan Powered Terminal Units: Experimental Results and Models for Parallel Units  

E-Print Network [OSTI]

consists of a central air handling unit (AHU), where air is cooled by cooling coils (Wendes 1994). This air, referred to as primary air, is sent through a single-duct supply system to VAV terminal units by the supply fan. Each terminal unit is ducted to air... surprise that the flow regressed well with the square root of the pressure differential across the terminal unit at a given damper setting and showed no dependence on SCR. The construction quality of these terminal units could be an item of concern...

Furr, J.; O'Neal, D.; Davis, M.; Bryant, J.; Cramlet, A.

137

United States  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwo New EnergyofDEVELOPMENTEnergy 1n n d d eAlan8 United

138

Audits and Inspections Work Plan Audits Central Audits Division  

Office of Environmental Management (EM)

Safety Risks to Workers and the Environment at Savannah River Sites Tank Farms Lockout Tagout (LOTO) Processes and Electrical Safety Prevention During Excavations and...

139

Audits and Inspections Work Plan Audits Central Audits Division  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top Five EERE BlogAttachmentFlash2011-21 Audit Letter6-0136Year 2015 Audits and

140

Using Graphics Processing Units to solve the classical N-body problem in physics and astrophysics  

E-Print Network [OSTI]

Graphics Processing Units (GPUs) can speed up the numerical solution of various problems in astrophysics including the dynamical evolution of stellar systems; the performance gain can be more than a factor 100 compared to using a Central Processing Unit only. In this work I describe some strategies to speed up the classical N-body problem using GPUs. I show some features of the N-body code HiGPUs as template code. In this context, I also give some hints on the parallel implementation of a regularization method and I introduce the code HiGPUs-R. Although the main application of this work concerns astrophysics, some of the presented techniques are of general validity and can be applied to other branches of physics such as electrodynamics and QCD.

Spera, Mario

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Decommissioning Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

Sanford, P. C.; Stevens, J. L.; Brandt, R.

2002-02-26T23:59:59.000Z

142

I~ Central Nevada-40 UNITED STATES DEPARTMENT OF THE INTERIOR  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '*I_ - I _ _ _ _ --~ *- -I ..'__,i

143

Central collisions of heavy ions  

SciTech Connect (OSTI)

This report describes the activities of the Heavy Ion Physics Group at the University of California, Riverside from October 1, 1990 to September 30, 1991. During this period, our program focuses on particle production at AGS energies, and correlation studies at the Bevalac in nucleus central collisions. We participated in the preparation of letters of intent for two RHIC experiments -- the OASIS proposal and the Di-Muon proposal -- and worked on two RHIC R D efforts -- a silicon strip detector project and a muon-identifier project. A small fraction of time was also devoted to physics programs outside the realm of heavy ion reactions by several individuals.

Fung, Sun-yiu.

1991-10-01T23:59:59.000Z

144

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Computers and Other Electronics in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings...

145

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Air Conditioning in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total...

146

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Water Heating in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total...

147

Energy & Society Energy Units and Fundamentals Energy Units and Fundamentals of  

E-Print Network [OSTI]

Energy & Society Energy Units and Fundamentals 1 Toolkit 1: Energy Units and Fundamentals of Quantitative Analysis #12;Energy & Society Energy Units and Fundamentals 2 Table of Contents 1. Key Concepts: Force, Work, Energy & Power 3 2. Orders of Magnitude & Scientific Notation 6 2.1. Orders

Kammen, Daniel M.

148

Insuring Long-Term Care in the United States  

E-Print Network [OSTI]

Long-term care expenditures constitute one of the largest uninsured financial risks facing the elderly in the United States and thus play a central role in determining the retirement security of elderly Americans. In this ...

Finkelstein, Amy

149

DELIVERABLE Central North Sea  

E-Print Network [OSTI]

, as that has the same learning, but for more cost and more scale-up risk. The Central North Sea can produce into a guaranteed network for transportation and storage of captured CO2. Recent studies examining the levelised

Haszeldine, Stuart

150

Methods for Allocating Urban Emergency Units  

E-Print Network [OSTI]

An urban emergency service system provides mobile units (vehicles) to respond to requests for service which can occur at any time and any place throughout a city. This paper surveys recent quantitative work aimed at improving ...

Chaiken, Jan M.

151

CENTRAL PLATEAU REMEDIATION  

SciTech Connect (OSTI)

A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach to Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress.

ROMINE, L.D.

2006-02-01T23:59:59.000Z

152

A Centrality Detector Concept  

E-Print Network [OSTI]

The nucleus-nucleus impact parameter and collision geometry of a heavy ion collision are typically characterized by assigning a collision "centrality". In all present heavy ion experiments centrality is measured indirectly, by detecting the number of particles or the energy of the particles produced in the interactions, typically at high rapidity. Centrality parameters are associated to the measured detector response using the Glauber model. This approach suffers from systematic uncertainties related to the assumptions about the particle production mechanism and limitations of the Glauber model. In the collider based experiments there is a unique possibility to measure centrality parameters by registering spectator fragments remaining from the collision. This approach does not require model assumptions and relies on the fact that spectators and participants are related via the total number of nucleons in the colliding species. This article describes the concept of the centrality detector for heavy ion experiment, which measures the total mass number of all fragments by measuring their deflection in the magnetic field of the collider elements.

Sourav Tarafdar; Zvi Citron; Alexander Milov

2014-06-07T23:59:59.000Z

153

Centralized processing of contact-handled TRU waste feasibility analysis  

SciTech Connect (OSTI)

This report presents work for the feasibility study of central processing of contact-handled TRU waste. Discussion of scenarios, transportation options, summary of cost estimates, and institutional issues are a few of the subjects discussed. (JDL)

Not Available

1986-12-01T23:59:59.000Z

154

Microsoft Word - Central Ferry Fiber Project CX.doc  

Broader source: Energy.gov (indexed) [DOE]

Proposed Action: Central Ferry Fiber Project Budget Information: Work Order 00223131, Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7...

155

SECTION 593 WRDA 1999, AS AMENDED CENTRAL NEW MEXICO  

E-Print Network [OSTI]

SECTION 593 ­ WRDA 1999, AS AMENDED CENTRAL NEW MEXICO MODEL AGREEMENT FOR DESIGN ASSISTANCE (WORK New Mexico pursuant to Section 593 of the Water Resources Development Act of 1999, Public Law 106

US Army Corps of Engineers

156

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

2 Computers and Other Electronics in U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in...

157

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Not Asked (Apartments in Buildings" "With 5 or More Units)",19.1,4.4,3.7,6.2,4.7 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

158

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Not Asked (Apartments in Buildings" "With 5 or More Units)",19.1,9.6,5,2.2,1.5,0.8 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

159

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

2 Air Conditioning in U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With"...

160

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

2 Water Heating in U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With"...

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

United States Department of  

E-Print Network [OSTI]

Gifford Pinchot Drive Madison, WI #12;2 International system of units (SI conversion factors) Conversion English unit factor SI unit acre 4,046 square meter (m2 ) board foot 0.002 cubic meter (m3 ) bushel (U

162

PUREX facility preclosure work plan  

SciTech Connect (OSTI)

This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D).

Engelmann, R.H.

1997-04-24T23:59:59.000Z

163

United States-Japan Nuclear Security Working Group | National Nuclear  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption by sectorlong version)Underground NaturalUnions, 325.6Security

164

Statement: Committee on Environment and Public Works United States Senate |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage » SearchEnergyDepartmentScopingOverviewFranklin M. Orr,

165

Central Ferry Lower Monumental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New Substation SitesStanding Friedel Waves,TheoryParliament' |CentralCentral

166

Second Proof Work, Power, and Energy  

E-Print Network [OSTI]

) energy sources, such as solar energy, wind, water flows, ocean and tidal waves, and biomassSecond Proof Work, Power, and Energy M. KOSTIC Northern Illinois University DeKalb, Illinois, United States 1. Basic Concepts 2. Forms, Classifications, and Conservation of Energy 3. Work

Kostic, Milivoje M.

167

POWER CENTRALIZED SEMIGROUPS PRIMOZ MORAVEC  

E-Print Network [OSTI]

POWER CENTRALIZED SEMIGROUPS PRIMOZ MORAVEC Abstract. A semigroup is said to be power centralized if for every pair of elements x and y there exists a power of x commuting with y. The structure of power centralized groups and semigroups is investigated. In particular, we characterize 0-simple power centralized

168

Israel, Iran, and the United States: A Precarious Alliance.  

E-Print Network [OSTI]

??The purpose of this work is to examine the relationship between Iran and Israel after Israel became a state in 1948 following the United Nations… (more)

Ellsworth, Roy J

2014-01-01T23:59:59.000Z

169

admissions unit evaluation: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Evaluation of United Nations Specialized Agencies Serial Publications University of Kansas - KU ScholarWorks Summary: During the spring and summer of 2008 the University of...

170

EM Completes Salt Waste Disposal Units $8 Million under Budget...  

Broader source: Energy.gov (indexed) [DOE]

work is essential to the mission of cleaning and closing the site's underground waste tanks. Construction of these circular units - vaults built in the past are rectangular -...

171

United Nations A/67/L.75* General Assembly Distr.: Limited  

E-Print Network [OSTI]

and related fields Afghanistan, Albania, Angola, Armenia, Australia, Azerbaijan, Bangladesh, Belarus, Belize water resources, Appreciating the ongoing work of the organizations of the United Nations system

Cambridge, University of

172

A quarterly and Central  

E-Print Network [OSTI]

A quarterly report on employment and office markets in Northern and Central New Jersey May 2008- plications for the state's office markets. This year has every indication of being a very difficult capacity. Along with the ongoing Portfields Initiative project, the Port of New York and New Jersey

173

HANFORD SITE CENTRAL PLATEAU CLEANUP COMPLETION STRATEGY  

SciTech Connect (OSTI)

Cleanup of the Hanford Site is a complex and challenging undertaking. The U.S. Department of Energy (DOE) has developed a comprehensive vision for completing Hanford's cleanup mission including transition to post-cleanup activities. This vision includes 3 principle components of cleanup: the {approx}200 square miles ofland adjacent to the Columbia River, known as the River Corridor; the 75 square miles of land in the center of the Hanford Site, where the majority of the reprocessing and waste management activities have occurred, known as the Central Plateau; and the stored reprocessing wastes in the Central Plateau, the Tank Wastes. Cleanup of the River Corridor is well underway and is progressing towards completion of most cleanup actions by 2015. Tank waste cleanup is progressing on a longer schedule due to the complexity of the mission, with construction of the largest nuclear construction project in the United States, the Waste Treatment Plant, over 50% complete. With the progress on the River Corridor and Tank Waste, it is time to place increased emphasis on moving forward with cleanup of the Central Plateau. Cleanup of the Hanford Site has been proceeding under a framework defmed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In early 2009, the DOE, the State of Washington Department of Ecology, and the U.S. Environmental Protection Agency signed an Agreement in Principle in which the parties recognized the need to develop a more comprehensive strategy for cleanup of the Central Plateau. DOE agreed to develop a Central Plateau Cleanup Completion Strategy as a starting point for discussions. This DOE Strategy was the basis for negotiations between the Parties, discussions with the State of Oregon, the Hanford Advisory Board, and other Stakeholder groups (including open public meetings), and consultation with the Tribal Nations. The change packages to incorporate the Central Plateau Cleanup Completion Strategy were signed by the Parties on October 26,2010, and are now in the process of being implemented.

BERGMAN TB

2011-01-14T23:59:59.000Z

174

Iowa Central Quality Fuel Testing Laboratory  

SciTech Connect (OSTI)

The objective of this project is to finalize the creation of an independent quality fuel testing laboratory on the campus of Iowa Central Community College in Fort Dodge, Iowa that shall provide the exploding biofuels industry a timely and cost-effective centrally located laboratory to complete all state and federal fuel and related tests that are required. The recipient shall work with various state regulatory agencies, biofuel companies and state and national industry associations to ensure that training and testing needs of their members and American consumers are met. The recipient shall work with the Iowa Department of Ag and Land Stewardship on the development of an Iowa Biofuel Quality Standard along with the Development of a standard that can be used throughout industry.

Heach, Don; Bidieman, Julaine

2013-09-30T23:59:59.000Z

175

National Geothermal Association Trade Mission to Central America  

SciTech Connect (OSTI)

The United States (US) geothermal industry, the world's most technically proficient, has been unable to achieve penetration into the markets of the developing nations. This report details the findings of an industry Trade Mission to Central America, tasked with determining the reasons for this shortfall and with developing a US industry geothermal export strategy designed to achieve immediate and long-term export benefits.

Not Available

1992-10-01T23:59:59.000Z

176

Improving Work Flow Reliability Proceedings IGLC-7 275  

E-Print Network [OSTI]

Ballard1 ABSTRACT Improving work flow reliability is important for the productivity of linked productionImproving Work Flow Reliability Proceedings IGLC-7 275 IMPROVING WORK FLOW RELIABILITY Glenn units, and consequently for project cost and duration. One measure of work flow reliability is PPC

Tommelein, Iris D.

177

Batteries and electrochemical energy storage are central to any future alternative energy scenario. Future energy generation  

E-Print Network [OSTI]

Batteries and electrochemical energy storage are central to any future alternative energy scenario. Future energy generation sources are likely to be intermittent, requiring storage capacity energy storage for uninterrupted power supply units, the electrical grid, and transportation. Of all

Kemner, Ken

178

School of Social Work Fort Collins, Colorado 80523-1586  

E-Print Network [OSTI]

School of Social Work Fort Collins, Colorado 80523-1586 Phone (970) 491-6612 Fax (970) 491-7280 Colorado State University College of Health and Human Sciences School of Social Work http or disability. #12;ii Greetings! Welcome to the School of Social Work at Colorado State University! Central

Rutledge, Steven

179

Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text  

SciTech Connect (OSTI)

The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1, data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.

Not Available

1993-09-01T23:59:59.000Z

180

Robin M. Kohn, MSW, LCSW University of Central Florida  

E-Print Network [OSTI]

1 Robin M. Kohn, MSW, LCSW University of Central Florida School of Social Work P.O. Box 163358 Work Practice with Loss and Life's Transitions o Field Education Seminar Media Enhanced #12;2 MSW Committee Member o MSW Coordinator of Advising Position, Co-Chair o MSW Coordinator Position Search

Wu, Shin-Tson

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Central Solenoid Insert Technical Specification  

SciTech Connect (OSTI)

The US ITER Project Office (USIPO) is responsible for the ITER central solenoid (CS) contribution to the ITER project. The Central Solenoid Insert (CSI) project will allow ITER validation the appropriate lengths of the conductors to be used in the full-scale CS coils under relevant conditions. The ITER Program plans to build and test a CSI to verify the performance of the CS conductor. The CSI is a one-layer solenoid with an inner diameter of 1.48 m and a height of 4.45 m between electric terminal ends. The coil weight with the terminals is approximately 820 kg without insulation. The major goal of the CSI is to measure the temperature margin of the CS under the ITER direct current (DC) operating conditions, including determining sensitivity to load cycles. Performance of the joints, ramp rate sensitivity, and stability against thermal or electromagnetic disturbances, electrical insulation, losses, and instrumentation are addressed separately and therefore are not major goals in this project. However, losses and joint performance will be tested during the CSI testing campaign. The USIPO will build the CSI that will be tested at the Central Solenoid Model Coil (CSMC) Test Facility at the Japan Atomic Energy Agency (JAEA), Naka, Japan. The industrial vendors (the Suppliers) will report to the USIPO (the Company). All approvals to proceed will be issued by the Company, which in some cases, as specified in this document, will also require the approval of the ITER Organization. Responsibilities and obligations will be covered by respective contracts between the USIPO, called Company interchangeably, and the industrial Prime Contractors, called Suppliers. Different stages of work may be performed by more than one Prime Contractor, as described in this specification. Technical requirements of the contract between the Company and the Prime Contractor will be covered by the Fabrication Specifications developed by the Prime Contractor based on this document and approved by the Company and ITER. The Fabrication Specifications may reflect some national requirements and regulations that are not fully provided here. This document presents the ITER CSI specifications.

Martovetsky, Nicolai N [ORNL; Smirnov, Alexandre [ORNL

2011-09-01T23:59:59.000Z

182

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Televisions" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Televisions" "Number of...

183

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings With" ,,,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" ,"Total U.S.1 (millions)" "Fuels Used and End Uses",,"Own","Rent","Own","Rent",...

184

Centralized Procurement Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and User ExecutiveCentral Activator Keeps

185

ARM - SGP Central Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUC :ProductsSCM Forcing Data DerivedInstrumentsPolar YearResearchBoundaryCentral

186

Unit Testing Discussion C  

E-Print Network [OSTI]

Unit Testing Discussion C #12;Unit Test public Method is smallest unit of code Input/output transformation Test if the method does what it claims Not exactly black box testing #12;Test if (actual result Expected Computed Input #12;Functionality Computation ­ Easy to test Time based Asynchronous interaction

Massachusetts at Amherst, University of

187

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,4.4,1,0.5,0.5,3.4,2.4,0.6,0.5 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

188

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"With 5 or More Units)",19.1,2.3,16.8,"N","N","N","N","N","N",2.3,16.8,"N","N" "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

189

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,2,0.7,1.3,2.6,4.1,3.5,2.5,2.4 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

190

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"With 5 or More Units)",19.1,6.2,3.5,0.5,0.5,1.1,0.6,"Q",0.7,0.4,0.2,2,1.4,0.6 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

191

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Buildings" "With 5 or More Units)",19.1,4.7,0.9,0.4,0.3,"Q",0.6,0.4,"Q",3.8,2.9,0.9 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

192

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,3.7,2.7,0.9,0.6,0.3,0.9,1,0.2,0.6,0.2 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

193

Miocene faulting at plate tectonic velocity in the Himalaya of central Nepal  

E-Print Network [OSTI]

Miocene faulting at plate tectonic velocity in the Himalaya of central Nepal Matthew J. Kohna, Tri-Chandra Campus, Ghantaghar, Kathmandu, Nepal, United States Received 7 April 2004; received (MCT) and affiliated faults in central Nepal. Inferred rates were 1.5F0.9 cm/yr (Langtang Thrust, ~19

194

Review: [Untitled] Reviewed Work(s)  

E-Print Network [OSTI]

Review: [Untitled] Reviewed Work(s): Dodonæus in Japan: Translation and the Scientific Mind to leading academic journals and scholarly literature from around the world. The Archive is supported-for-profit organization with a mission to help the scholarly community take advantage of advances in technology. For more

Elman, Benjamin

195

QEP WORKING GROUP CHARGES Assessment Working Group  

E-Print Network [OSTI]

and a framework that details timelines, leadership, resource allocation, and an assessment plan that is clearlyQEP WORKING GROUP CHARGES Assessment Working Group The topic of the QEP should fit should be supported by a thorough understanding of the institutional context and by assessment data

Liu, Paul

196

Stirling engine with air working fluid  

DOE Patents [OSTI]

A Stirling engine capable of utilizing air as a working fluid which includes a compact heat exchange module which includes heating tube units, regenerator and cooler positioned about the combustion chamber. This arrangement has the purpose and effect of allowing the construction of an efficient, high-speed, high power-density engine without the use of difficult to seal light gases as working fluids.

Corey, John A. (North Troy, NY)

1985-01-01T23:59:59.000Z

197

Stirling engine with air working fluid  

SciTech Connect (OSTI)

A Stirling engine capable of utilizing air as a working fluid which includes a compact heat exchange module which includes heating tube units, regenerator and cooler positioned about the combustion chamber. This arrangement has the purpose and effect of allowing the construction of an efficient, high-speed, high power-density engine without the use of difficult to seal light gases as working fluids.

Corey, J. A.

1985-08-06T23:59:59.000Z

198

Central solar energy receiver  

DOE Patents [OSTI]

An improved tower-mounted central solar energy receiver for heating air drawn through the receiver by an induced draft fan. A number of vertically oriented, energy absorbing, fin-shaped slats are radially arranged in a number of concentric cylindrical arrays on top of the tower coaxially surrounding a pipe having air holes through which the fan draws air which is heated by the slats which receive the solar radiation from a heliostat field. A number of vertically oriented and wedge-shaped columns are radially arranged in a number of concentric cylindrical clusters surrounding the slat arrays. The columns have two mirror-reflecting sides to reflect radiation into the slat arrays and one energy absorbing side to reduce reradiation and reflection from the slat arrays.

Drost, M. Kevin (Richland, WA)

1983-01-01T23:59:59.000Z

199

Centre for Arab and Islamic Studies (The Middle East & Central Asia)  

E-Print Network [OSTI]

present included The Hon. Tim Fischer, HE Mr Khalifa Al-Falasi, Ambassador of the United Arab Emirates for the support he has provided to the Centre during his posting as Ambassador of the United Arab EmiratesCentre for Arab and Islamic Studies (The Middle East & Central Asia) BULLETINCENTRE FOR ARAB

200

Anomalous United States weather patterns accompanying Stratospheric Sudden Warming  

E-Print Network [OSTI]

Yearly cyclone frequency over North America and adjacent oceans, corresponding linear regression line and correlation coe f f icient 35 FIG. 12 FIG. 13 As Fig. 11, except for February Yearly January cyclone frequency over the United States..., or to the west of, the United States coastline and in the north central Atlantic Ocean. The ridging then extends northwards over both oceans toward the polar regions. At the same time, the tropo- spheric polar vortex splits into two distinct centers ? one...

Douglas, Donald Albert

2012-06-07T23:59:59.000Z

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Working Title Scientist 3 Auto req ID 1024BR  

E-Print Network [OSTI]

of these vegetation management efforts. Will work with the staff and management at the field stations. Reports to the Vegetation Management Section's Invasive Species Unit Lead Scientist and will work closely. Prepares required work orders and reports for planning, implementing and documenting vegetation management

Mazzotti, Frank

202

United States Department of  

E-Print Network [OSTI]

., Ashland, OR 97520 and Gwyneth Myer, Consultant, 220 W. Rapp Rd. Unit 3, Talent, OR 97540. #12;2 THE FIRE

203

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

1 Computers and Other Electronics in Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census...

204

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Computers and Other Electronics in Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census...

205

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

8 Computers and Other Electronics in Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census...

206

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

1 Air Conditioning in Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,"Pacific Census...

207

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

8 Air Conditioning in Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census Division",,,"Middle...

208

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Air Conditioning in Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census Division",,,,,,"East...

209

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Water Heating in U.S. Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census Division",,,,,,"East...

210

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

11 Water Heating in U.S. Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,"Pacific...

211

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

8 Water Heating in U.S. Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census...

212

Managing everyday identity challenges at work : stories from a biotech company  

E-Print Network [OSTI]

Work identity, how we view ourselves in a working capacity, is a central part of who we are and an indispensable element of our lives. Yet, difficult moments frequently occur that challenge our identity as competent and ...

Xu, Heng, Ph. D. Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

213

Team work: Construction  

E-Print Network [OSTI]

Team work: Construction Management The Division of Engineering Technology in an construction technology area, an associate degree in construction science, or college- level course work equivalent to an associate degree in construction related area

Berdichevsky, Victor

214

Associative list processing unit  

DOE Patents [OSTI]

An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full. Also, an associative list processing unit and method comprising employing a plurality of prioritized cell blocks and using a tree of prioritized multiplexers descending from the plurality of cell blocks.

Hemmert, Karl Scott; Underwood, Keith D.

2013-01-29T23:59:59.000Z

215

United States Environmental  

E-Print Network [OSTI]

Protect Your Family From Lead in Your Home United States Environmental Protection Agency United · What you can do to protect your family · Where to go for more information Before renting or buying Family from Lead Hazards If you think your home has lead-based paint: · Don't try to remove lead

Loudon, Catherine

216

United States Department of  

E-Print Network [OSTI]

Assessment Thomas M. Quigley, Editor U.S. Department of Agriculture Forest Service Pacific Northwest Research, and Andy Wilson. Thomas M. Quigley Editor United States Department of Agriculture Forest Service United Service, Pacific Northwest Research Station. 120 p. (Quigley, Thomas M., ed.; Interior Columbia Basin

Brown, Gregory G.

217

Interagency Sustainability Working Group  

Broader source: Energy.gov [DOE]

The Interagency Sustainability Working Group (ISWG) is the coordinating body for sustainable buildings in the federal government.

218

Reduce Steam Trap Failures at Chambers Works  

E-Print Network [OSTI]

Ultrasonic Inspection At least 2 times per year Steam Trap Surveyor Submit reports to area management, energy team, and reliability engineers for each area every month Steam Trap Team Leader Control Plan ? Process Owner agrees...Reduce Steam Trap Failures at Chambers Works GB/BB Name: Cyndi Kouba Mentor/MBB: Andrew Degraff Team Members Michael Crowley(Site Energy Lead), (Charlie) Flanigan (Aramids-maintenance), Ben Snyder (Aramids-ATO), Michael Scruggs (Central...

Kouba, C.

219

Work Permit # 51012MZ5 Work Order# '  

E-Print Network [OSTI]

Confined Space· 0 Ergonomics· 0 Material Handling o ,Beryllium· 0 Electrical 0 Hydraulic o Safety Harness o Electrical Working Hot o Electrical Noise 0 Potential to Cause aFalse Alarm o QiCombustible Gas o IHSurvey Dosimeter o LockoutITagout o Spill potential o Self-reading Pencil Dosimeter o Impair Fire Protection

Homes, Christopher C.

220

Impact of High Wind Power Penetration on Hydroelectric Unit Operations  

SciTech Connect (OSTI)

The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Newman Unit 1 advanced solar repowering advanced conceptual design. Final report  

SciTech Connect (OSTI)

The Newman Unit 1 solar repowering design is a water/steam central receiver concept supplying superheated steam. The work reported is to develop a refined baseline conceptual design that has potential for construction and operation by 1986, makes use of existing solar thermal technology, and provides the best economics for this application. Trade studies performed in the design effort are described, both for the conceptual design of the overall system and for the subsystem conceptual design. System-level functional requirements, design, operation, performance, cost, safety, environmental, institutional, and regulatory considerations are described. Subsystems described include the collector, receiver, fossil energy, electrical power generating, and master control subsystems, site and site facilities. The conceptual design, cost, and performance of each subsystem is discussed at length. A detailed economic analysis of the repowered unit is made to realistically assess the economics of the first repowered unit using present cost data for a limited production level for solar hardware. Finally, a development plan is given, including the design, procurement, construction, checkout, startup, performance validation, and commercial operation. (LEW)

none,

1982-04-01T23:59:59.000Z

222

Policy Research Unit in Economic Evaluation of  

E-Print Network [OSTI]

Policy Research Unit in Economic Evaluation of Health and Care Interventions Responsiveprogrammeto of conducting economic evaluation The methodological approaches to this responsive strand of work can take. This project will develop fresh approaches to economic evaluations to advise on cost- effectiveness

Oakley, Jeremy

223

UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD  

E-Print Network [OSTI]

the Department of Energy's (DOE) work related to the packaging and transport of such waste. Consistent with its and waste package performance. In light of continuing technical challenges, the Board believes that the DOEcon144vf UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD 2300 Clarendon Boulevard, Suite 1300

224

The Governance of Clean Development Working Paper 011 December 2010  

E-Print Network [OSTI]

explores the actors, institutions, and policy-making processes at the national and international level Operational Entity EU European Union EC European Community GHG Greenhouse gas UNFCCC United Nations Framework Convention on Climate Change US United States #12;Jolene Lin | GCD Working Paper 011, December 2010 5

Matthews, Adrian

225

Interview: LaborWorks@NeighborWorks Provides Vermont Contractors...  

Broader source: Energy.gov (indexed) [DOE]

Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They...

226

Centralized digital control of accelerators  

SciTech Connect (OSTI)

In contrasting the title of this paper with a second paper to be presented at this conference entitled Distributed Digital Control of Accelerators, a potential reader might be led to believe that this paper will focus on systems whose computing intelligence is centered in one or more computers in a centralized location. Instead, this paper will describe the architectural evolution of SLAC's computer based accelerator control systems with respect to the distribution of their intelligence. However, the use of the word centralized in the title is appropriate because these systems are based on the use of centralized large and computationally powerful processors that are typically supported by networks of smaller distributed processors.

Melen, R.E.

1983-09-01T23:59:59.000Z

227

Unit selection in a concatenative speech synthesis system using a large speech database   

E-Print Network [OSTI]

One approach to the generation of natural-sounding synthesized speech waveforms is to select and concatenate units from a large speech database. Units (in the current work, phonemes) are selected to produce a natural realisation of a target phoneme...

Hunt, Andrew; Black, Alan W

228

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

6 Televisions in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold","Mixed- Humid","Mixed-Dry"...

229

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

" Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold","Mixed- Humid","Mixed-Dry" "Fuels Used and End Uses",,"Cold",,"Hot-Dry","Hot-Humid...

230

" Million Housing Units, Preliminary"  

U.S. Energy Information Administration (EIA) Indexed Site

Computers and Other Electronics in U.S. Homes, By Number of Household Members, 2009" " Million Housing Units, Preliminary" ,,"Number of Household Members" ,"Total U.S.1 (millions)"...

231

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Computers and Other Electronics in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before...

232

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

7 Computers and Other Electronics in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South"...

233

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

5 Computers and Other Electronics in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty...

234

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

4 Air Conditioning in U.S. Homes, by Number of Household Members, 2009" " Million Housing Units, Final" ,,"Number of Household Members" ,"Total U.S.1 (millions)" ,,,,,,"5 or More...

235

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

7 Air Conditioning in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South","West" "Air...

236

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Air Conditioning in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to...

237

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

5 Air Conditioning in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2" ,,"Less...

238

Associative list processing unit  

DOE Patents [OSTI]

An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full.

Hemmert, Karl Scott; Underwood, Keith D

2014-04-01T23:59:59.000Z

239

United States Environmental Protection  

E-Print Network [OSTI]

environmental problems today and building a science knowledge base necessary to manage our ecological resources wisely, understand how pollutants affect our health, and prevent or reduce environmental risksUnited States Environmental Protection Agency Hydrogeologic Framework, Ground-Water Geochemistry

240

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Appliances in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to 1949","1950...

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Televisions in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to 1949","1950...

242

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Household Demographics of U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to...

243

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

5 Water Heating in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2" ,,"Less than...

244

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Water Heating in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to...

245

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

6 Water Heating in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold","Mixed- Humid","Mixed-Dry"...

246

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

7 Water Heating in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South","West" "Water...

247

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

4 Water Heating in U.S. Homes, by Number of Household Members, 2009" " Million Housing Units, Final" ,,"Number of Household Members" ,"Total U.S.1 (millions)" ,,,,,,"5 or More...

248

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2" ,,"Less than 20,000","20,000 to 39,999","40,000 to 59,999","60,000 to...

249

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

by the U.S. Department of Energy's Office of Energy and Efficiency and Renewable Energy (EERE). 3Housing units are classified as urban or rural using definitions created...

250

Name:______________________________________ _ Unit:___________________________________ Address:_ ___________________________________________________________________________  

E-Print Network [OSTI]

Poultry Name:______________________________________ _ Unit_Project_Began:_ __________________________ _ Ended:_________________________________ (Check All That Apply) Type of Project: Type of Poultry Raised: _____ Raising and Rearing Poultry _____ Commercial Egg Chickens _____ Poultry and Egg Consumer Projects

Liskiewicz, Maciej

251

A Study of Central Auction Based Wholesale Electricity Markets  

E-Print Network [OSTI]

A Study of Central Auction Based Wholesale Electricity Markets S. Ceppi and N. Gatti Dipartimento is the automation of such markets. In particular, we focus our attention on wholesale elec- tricity markets based works presented in the literature model wholesale markets as oligopolies, neglecting thus the specific

Gatti, Nicola

252

Work Area Policy  

E-Print Network [OSTI]

POLICY X.X.X. Volume V, Information Technology. Chapter 6, Acceptable Safety Work Locations. Issuing Office: Department of Mathematics. Responsible ...

2005-04-19T23:59:59.000Z

253

INL @ work: Archaeologist  

ScienceCinema (OSTI)

INL @ work features jobs performed at the lab. For more information about INL careers, visit http://www.facebook.com/idahonationallaboratory.

Lowrey, Dino

2013-05-28T23:59:59.000Z

254

INL @ work: Archaeologist  

SciTech Connect (OSTI)

INL @ work features jobs performed at the lab. For more information about INL careers, visit http://www.facebook.com/idahonationallaboratory.

Lowrey, Dino

2008-01-01T23:59:59.000Z

255

Freestall Facilities in Central Texas  

E-Print Network [OSTI]

surveyed recently for infor- L-5311 5-99 Freestall Dairy Facilities in Central Texas Sandy Stokes and Mike Gamroth* *Extension Dairy Specialist, Texas A&M University System, and Extension Dairy Specialist, Oregon State University. Freestall housing...

Stokes, Sandra R.; Gamroth, Mike

1999-06-04T23:59:59.000Z

256

INTEGRATED OCEAN DRILLING PROGRAM United States Implementing Organization  

E-Print Network [OSTI]

INTEGRATED OCEAN DRILLING PROGRAM United States Implementing Organization JOI Alliance Joint _______________________________ Steven R. Bohlen President, Joint Oceanographic Institutions Executive Director, Ocean Drilling Programs of work for Integrated Ocean Drilling Program (IODP) activities and deliverables for the current fiscal

257

Strategies for decommoditizing and internationalizing a prepaid business unit  

E-Print Network [OSTI]

This thesis aims to establish a new strategy for a Brazilian IT service company to leverage the operation of its prepaid business unit in Brazil and overseas. The work starts using the Delta Model to segment the customers, ...

Cavalcanti Machado, Luis Filipe (Luis Filipe Dionisio)

2011-01-01T23:59:59.000Z

258

Defense Energy Support Center: Installation Energy Commodity Business Unit  

Broader source: Energy.gov [DOE]

Presentation—given at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the Defense Energy Support Center's (DESC's) Installation Energy Commodity Business Unit (CBU) including its intent, commitment, pilot project, lessons learned, and impending barriers.

259

CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY  

SciTech Connect (OSTI)

THE CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY WAS CONDUCTED TO DEVELOP AN OPTIMAL SEQUENCE OF REMEDIATION ACTIVITIES IMPLEMENTING THE CERCLA DECISION ON THE CENTRAL PLATEAU. THE STUDY DEFINES A SEQUENCE OF ACTIVITIES THAT RESULT IN AN EFFECTIVE USE OF RESOURCES FROM A STRATEGIC PERSPECTIVE WHEN CONSIDERING EQUIPMENT PROCUREMENT AND STAGING, WORKFORCE MOBILIZATION/DEMOBILIZATION, WORKFORCE LEVELING, WORKFORCE SKILL-MIX, AND OTHER REMEDIATION/DISPOSITION PROJECT EXECUTION PARAMETERS.

BERGMAN TB; STEFANSKI LD; SEELEY PN; ZINSLI LC; CUSACK LJ

2012-09-19T23:59:59.000Z

260

Planning Health Into Your Meals Unit Preparation Materials and  

E-Print Network [OSTI]

UNIT 14: Planning Health Into Your Meals Unit Preparation Materials and Facilitator Guide #12; #12;Navigating for Success Planning Health into Your Meals Copyright 2007. Do not reproduce or distribute without ­ Planning Health into Your Meals WHO: Participants and Leaders Up to 12 nutrition educators working

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

New Central American Cinema (2001-2010)  

E-Print Network [OSTI]

This dissertation explores New Central American Cinema, a film movement that emerged in Central America during the 2000s. It examines feature-length fictional films produced and released in Central America between 2001-2010. ...

Duró n, Hispano

2014-05-31T23:59:59.000Z

262

Universidad Central de Venezuela Facultad de Ciencias  

E-Print Network [OSTI]

Universidad Central de Venezuela Facultad de Ciencias Escuela de Computación Lecturas en Ciencias, Universidad Central de Venezuela, Ap. 47002, Caracas 1041-A, Venezuela (mmonsalv, Universidad Central de Venezuela, Ap. 47002, Caracas 1041-A, Venezuela (mraydan

Raydan, Marcos

263

Work Authorization System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

It establishes a work authorization and control process for work performed by designated management and operating (M&O), management and integrating (M&I), environmental restoration management contracts (ERMC) and other contracts determined by the Procurement Executive (hereafter referred to as M&O contractors). Cancels DOE O 5700.7C. Canceled by DOE O 412.1A.

1999-04-20T23:59:59.000Z

264

Work Authorization System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. Cancels DOE O 412.1.

2005-04-21T23:59:59.000Z

265

Work Authorization System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A.

2005-04-21T23:59:59.000Z

266

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Central Warm-Air Furnace",19.1,2.3,1.2,0.2,"Q",0.1,0.8,1.1,0.6,0.2,0.2 "Heat Pump",9.8,0.6,0.3,"Q","Q","N",0.3,0.3,0.1,0.1,0.1 "Built-In Electric...

267

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Central Warm-Air Furnace",19.1,2.9,1,0.3,0.1,"Q",0.8,0.6,0.2,1.8,1.3,0.5 "Heat Pump",9.8,1.3,0.7,"Q","N","Q",0.7,0.6,"Q",0.6,0.1,0.4 "Built-In Electric...

268

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Central Warm-Air Furnace",19.1,11,8.2,8.3,1.3,0.4,0.6,0.2,1.3,0.5,4.4,1.6,0.4 "Heat Pump",9.8,8.2,1.6,6.7,0.4,0.5,0.1,"Q",0.2,0.1,0.8,0.8,"Q" "Built-In Electric...

269

Best Buys and Unit Pricing  

E-Print Network [OSTI]

This guide explains how to determine a unit price--the cost of an item based on a specific unit such as pound or ounce. Unit pricing can be used to identify foods that are the most economical....

Anding, Jenna

2000-02-02T23:59:59.000Z

270

Children's Unit for Treatment and Evaluation Dr. R.G. Romanczyk, Director  

E-Print Network [OSTI]

Children's Unit for Treatment and Evaluation Dr. R.G. Romanczyk, Director P.O. Box 6000 Binghamton are subject to clearance through the State Central Register of Child Abuse / Maltreatment and fingerprint instruction and care to children enrolled in the Children's Unit. 1. implement individualized educational

Suzuki, Masatsugu

271

Work with Biological Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption byAbout PrintableBlenderWhatFellowsWood and4213WorkWork withWork

272

Solving Unit Commitment by a Unit Decommitment Method  

E-Print Network [OSTI]

Solving Unit Commitment by a Unit Decommitment Method Chung-Li Tsengy,Chao-an Liz, Shmuel S. Oren x October 14, 1997 Abstract In this paper, we present an e cient and robust method for solving unit commit- ment problem using a unit decommitment method. 1 Introduction A problem that must be frequently solved

273

Central Plateau Cleanup at DOE's Hanford Site - 12504  

SciTech Connect (OSTI)

The discussion of Hanford's Central Plateau includes significant work in and around the center of the Hanford Site - located about 7 miles from the Columbia River. The Central Plateau is the area to which operations will be shrunk in 2015 when River Corridor cleanup is complete. This work includes retrieval and disposal of buried waste from miles of trenches; the cleanup and closure of massive processing canyons; the clean-out and demolition to 'slab on grade' of the high-hazard Plutonium Finishing Plant; installation of key groundwater treatment facilities to contain and shrink plumes of contaminated groundwater; demolition of all other unneeded facilities; and the completion of decisions about remaining Central Plateau waste sites. A stated goal of EM has been to shrink the footprint of active cleanup to less than 10 square miles by 2020. By the end of FY2011, Hanford will have reduced the active footprint of cleanup by 64 percent exceeding the goal of 49 percent. By 2015, Hanford will reduce the active footprint of cleanup by more than 90 percent. The remaining footprint reduction will occur between 2015 and 2020. The Central Plateau is a 75-square-mile region near the center of the Hanford Site including the area designated in the Hanford Comprehensive Land Use Plan Environmental Impact Statement (DOE 1999) and Record of Decision (64 FR 61615) as the Industrial-Exclusive Area, a rectangular area of about 20 square miles in the center of the Central Plateau. The Industrial-Exclusive Area contains the 200 East and 200 West Areas that have been used primarily for Hanford's nuclear fuel processing and waste management and disposal activities. The Central Plateau also encompasses the 200 Area CERCLA National Priorities List site. The Central Plateau has a large physical inventory of chemical processing and support facilities, tank systems, liquid and solid waste disposal and storage facilities, utility systems, administrative facilities, and groundwater monitoring wells. As a companion to the Hanford Site Cleanup Completion Framework document, DOE issued its draft Central Plateau Cleanup Completion Strategy in September 2009 to provide an outline of DOE's vision for completion of cleanup activities across the Central Plateau. As major elements of the Hanford cleanup along the Columbia River Corridor near completion, DOE believed it appropriate to articulate the agency vision for the remainder of the cleanup mission. The Central Plateau Cleanup Completion Strategy and the Hanford Site Cleanup Completion Framework were provided to the regulatory community, the Tribal Nations, political leaders, the public, and Hanford stakeholders to promote dialogue on Hanford's future. The Central Plateau Cleanup Completion Strategy describes DOE's vision for completion of Central Plateau cleanup and outlines the decisions needed to achieve the vision. The Central Plateau strategy involves steps to: (1) contain and remediate contaminated groundwater, (2) implement a geographic cleanup approach that guides remedy selection from a plateau-wide perspective, (3) evaluate and deploy viable treatment methods for deep vadose contamination to provide long-term protection of the groundwater, and (4) conduct essential waste management operations in coordination with cleanup actions. The strategy will also help optimize Central Plateau readiness to use funding when it is available upon completion of River Corridor cleanup projects. One aspect of the Central Plateau strategy is to put in place the process to identify the final footprint for permanent waste management and containment of residual contamination within the 20-square-mile Industrial-Exclusive Area. The final footprint identified for permanent waste management and containment of residual contamination should be as small as practical and remain under federal ownership and control for as long as a potential hazard exists. Outside the final footprint, the remainder of the Central Plateau will be available for other uses consistent with the Hanford Comprehensive Land-Use Plan (DOE 1999), while

Dowell, Jonathan [US DOE (United States)

2012-07-01T23:59:59.000Z

274

Construction work process management  

E-Print Network [OSTI]

-related activities. The study addresses relationships between selected TQM concepts (TQM tools, training, process focus, and teamwork) and work process management, defined in terms of planning, control, and improvement. The investigation was performed in two...

Soares, Jorge Barbosa

1994-01-01T23:59:59.000Z

275

Clean Energy Works (Oregon)  

Broader source: Energy.gov [DOE]

Clean Energy Works began in 2009 as a pilot program run by the City of Portland. In 2010, the US department of Energy awarded $20 million to create a statewide nonprofit to expand the program...

276

How Fusion Energy Works  

Broader source: Energy.gov [DOE]

Fusion energy is the energy source of the sun and all of the stars. As part of How Energy Works, we'll cover everything from fuel sources to plasma physics and beyond.

277

UNITED STATES OF AMERICA  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of EnergyProgram2-26 Date:CharterDepartmentDOE LM issued theUNITED STATES UNITED

278

An Edge-based Formulation for the Combined-Cycle Units  

E-Print Network [OSTI]

Oct 1, 2014 ... Based on various combinations of combustion turbines (CTs) and steam turbines (STs), the combined-cycle unit could work at different ...

Lei Fan

2014-10-01T23:59:59.000Z

279

United States Government  

Office of Legacy Management (LM)

Milling Machine, Cihc Fenwal, Ashland, HA Food Machining Corp., Nitro, WV General Electric Plant, Shelbyvi Gleason Works, Rochester, NV C.I. Haynes, Cranston, RI Heald Machine...

280

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Central Warm-Air Furnace",19.1,13.7,6.6,0.4,0.9,3.3,0.5,1.5,2.1,0.9,1.1,5,3.4,1.6 "Heat Pump",9.8,7.5,5.6,1.1,0.5,1.7,0.7,1.6,1.3,0.4,0.9,0.5,0.3,0.2 "Built-In Electric...

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

B Plant Complex preclosure work plan  

SciTech Connect (OSTI)

This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

ADLER, J.G.

1999-02-02T23:59:59.000Z

282

United States Department of  

E-Print Network [OSTI]

play an important role in a national program for reducing greenhouse gas emissions. The conversion potential through conversion of nonforest land to forest land and through the management of forest lands and sinks in the United States can be identified. International treaties on greenhouse gas reduction require

283

United States Department of  

E-Print Network [OSTI]

Hills National Forest uses such a habitat capability model (HABCAP), but its accuracy is largely unknown, Wildlife Biologist with Black Hills National Forest, Custer, SD 2 South Dakota State UniversityUnited States Department of Agriculture Forest Service Rocky Mountain Forest and Range Experiment

284

United States Department of  

E-Print Network [OSTI]

United States Department of Agriculture Managing Habitats for White-tailed DeerForest Service Rocky Mountain Forest and Range Experiment Station Fort Collins, Colorado 80526 General Technical Report RM-GTR-274 Black Hills and Bear Lodge Mountains of South Dakota and Wyoming Carolyn Hull Sieg and Kieth E

285

United States Department of  

E-Print Network [OSTI]

: For additional copies: U.S. FOREST SERVICE U.S. Forest Service 11 CAMPUS BLVD SUITE 200 Publications Distribution Forest, New Hampshire, began in 1932. One of the studies, still maintained today, consisted of severalUnited States Department of Agriculture Forest Service Northern Research Station Research Paper NRS

286

United States Department of  

E-Print Network [OSTI]

Station at Durham, New Hampshire. The computer program described in this publication was created usingUnited States Department of Agriculture Forest Service Northern Research Station General Technical://www.nrs.fs.fed.us/ Published by: For additional copies: U.S. FOREST SERVICE U.S. Forest Service 11 CAMPUS BLVD SUITE 200

287

United States Department of  

E-Print Network [OSTI]

copies: USDA FOREST SERVICE USDA Forest Service 11 CAMPUS BLVD SUITE 200 Publications Distribution at Durham, New Hampshire; JENNIFER C. JENKINS, jjenkins@fs.fed.us, is a research foresterUnited States Department of Agriculture Forest Service Northeastern Research Station General

288

United Nations Development Programme  

E-Print Network [OSTI]

Energy Concessions: Pilot Programs 7.5. Modernising Corn Stover Use in Rural Jilin Province, China 7United Nations Development Programme Bureau for Development Policy Energy and Atmosphere Programme. #12;5 Acknowledgements 6 Notes on Authors 7 Foreword 9 Executive Summary 27 Introduction: Energy

289

United States Department of  

E-Print Network [OSTI]

are thought to contribute to carbon sequestration, including current debates on this topic. The science regarding forestry and carbon sequestration is more advanced and less controversial than that for range, land management, carbon sequestration, carbon markets, United States. #12;ii Executive Summary

290

FISHERY STATISTICS UNITED STATES  

E-Print Network [OSTI]

FISHERY STATISTICS OF THE UNITED STATES 1973 STATISTICAL DIGEST NO. 67 Prepared by STATISTICS a review of the fishery statistics for the year 1973 . These statistics include data on the volume and value of landings of fishery products, employment 1n the fish- eries, quantity of gear operated, number

291

FISHERY STATISTICS UNITED STATES  

E-Print Network [OSTI]

FISHERY STATISTICS OF THE UNITED STATES 1971 STATISTICAL DIGEST NO. 65 Prepared by STATISTICS ry statistics for the year 1971 . These statistics include data on the volume and value of landings of fishery products, employment in the fishe ries, quantity of gear operated, number of fishing craft e

292

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

7 Air Conditioning Usage Indicators by Type of Housing Unit, 2005" " Million U.S. Housing Units" ,,"Type of Housing Unit" ,"Housing Units (millions)","Single-Family...

293

Central Ferry-Lower Monumental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and User ExecutiveCentral Activator Keeps theCentral Ferry

294

Central Facility Benefits from Improvements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New Substation SitesStanding Friedel Waves,TheoryParliament' |CentralCentral Air2

295

Work with Biological Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption byAbout PrintableBlenderWhatFellowsWood and4213WorkWork with

296

Working With Us | NREL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies | Blandine Jerome Careers at WIPPCompletesWork/LifeWorking

297

High-gravity central stars  

E-Print Network [OSTI]

NLTE spectral analyses of high-gravity central stars by means of state-of-the-art model atmosphere techniques provide information about the precursor AGB stars. The hydrogen-deficient post-AGB stars allow investigations on the intershell matter which is apparently exhibited at the stellar surface. We summarize recent results from imaging, spectroscopy, and spectropolarimetry.

Thomas Rauch

2006-07-11T23:59:59.000Z

298

High Temperature Membrane Working Group  

Broader source: Energy.gov (indexed) [DOE]

the welcome, James Fenton from the University of Central FloridaFlorida Solar Energy Center, commented on the excellent talks being given at PRIME. Dr. Fenton noted that...

299

Exploration geothermal gradient drilling, Platanares, Honduras, Central America  

SciTech Connect (OSTI)

This paper is a review and summary of the core drilling operations component of the Honduras Geothermal Resource Development Project at the Platanares geothermal prospect in Honduras, Central America. Three intermediate depth (428 to 679 m) coreholes are the first continuously cored geothermal exploration boreholes in Honduras. These coring operations are part of the Central America Energy Resource Project (CAERP) effort funded by the Agency for International Development (AID) and implemented by the Los Alamos National Laboratory (Los Alamos) in cooperation with the Empresa Nacional de Energia Electrica (ENEE) and the United States Geological Survey (USGS). This report emphasizes coring operations with reference to the stratigraphy, thermal gradient, and flow test data of the boreholes. The primary objectives of this coring effort were (1) to obtain quantitative information on the temperature distribution as a function of depth, (2) to recover fluids associated with the geothermal reservoir, (3) to recover 75% or better core from the subsurface rock units, and (4) to drill into the subsurface rock as deeply as possible in order to get information on potential reservoir rocks, fracture density, permeabilities, and alteration histories of the rock units beneath the site. The three exploration coreholes drilled to depths of 650, 428 and 679 m, respectively, encountered several hot water entries. Coring operations and associated testing began in mid-October 1986 and were completed at the end of June 1987.

Goff, S.J.; Laughlin, A.W.; Ruefenacht, H.D.; Goff, F.E.; Heiken, G.; Ramos, N.

1988-01-01T23:59:59.000Z

300

Formation mechanism of the secondary building unit in a chromium terephthalate metal-organic framework  

SciTech Connect (OSTI)

Based on density functional theory calculations and simulation, a detailed mechanism is presented on the formation of the secondary building unit (SBU) of MIL-101, a chromium terephthalate metal-organic framework (MOF). SBU formation is key to MOF nucleation, the rate-limiting step in the formation process of many MOFs. A series of reactions that lead to the formation of the SBU of MIL-101 is proposed in this work. Initial rate-limiting reactions form the metal cluster with three chromium (III) atoms linked to a central bridging oxygen. Terephthalate linkers play a key role as chromium (III) atoms are joined to linker carboxylate groups prior to the placement of the central bridging oxygen. Multiple linker addition reactions, which follow in different paths due to structural isomers, are limited by the removal of water molecules in the first chromium coordination shell. The least energy path is identified were all linkers on one face of the metal center plane are added first. A simple kinetic model based on transition state theory shows the rate of secondary building unit formation similar to the rate metal-organic framework nucleation. The authors are thankful to Dr. R. Rousseau for a critical reading of the manuscript. This research would not have been possible without the support of the Office of Fossil Energy, U.S. Department of Energy. This research was performed using EMSL, a national scientific user facility sponsored by the Department of Energy's Office of Biological and Environmental Research and the PNNL Institutional Computing (PIC) program located at Pacific Northwest National Laboratory.

Cantu Cantu, David; McGrail, B. Peter; Glezakou, Vassiliki Alexandra

2014-11-25T23:59:59.000Z

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

International Class Conflict: A Study of Nicaraguan Domestic Policy and United States Foreign Policy Related to the Counter-Revolution  

E-Print Network [OSTI]

This thesis examines historical events which led to the direct and indirect involvement of United States government and industry resources in attempts to influence the political and economic structures of the Central ...

Fullerton, John Daniel

1997-01-01T23:59:59.000Z

302

Public Works Transportation Infrastructure Study  

E-Print Network [OSTI]

Public Works Transportation Infrastructure Study Minneapolis City of Lakes Minneapolis Public Works Transportation Infrastructure Study #12;Public Works Transportation Infrastructure Study Minneapolis City Works Transportation Infrastructure Study Minneapolis City of Lakes Background: · Currently, funding

Minnesota, University of

303

WORK PROGRAMME 2009 COOPERATION  

E-Print Network [OSTI]

_______ 15 SSH-2009 - 4.1.1. Competition and collaboration in access to oil, gas and mineral resourcesWORK PROGRAMME 2009 COOPERATION THEME 8 SOCIO-ECONOMIC SCIENCES AND HUMANITIES (European Commission and the Humanities Page 1 of 38 OBJECTIVE_______________________________________________________________ 3 I CONTEXT

Milano-Bicocca, Università

304

Work Force Discipline  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order provides guidance and procedures and states responsibilities for maintaining work force discipline in DOE. Chg 1, dated 3-11-85; Chg 2, dated 1-6-86; Chg 3, dated 3-21-89; Chg 4, dated 8-2-90; Chg 5, dated 3-9-92; Chg 6, dated 8-21-92, cancels Chg 5.

1983-03-23T23:59:59.000Z

305

Moulinath Banerjee Work Address  

E-Print Network [OSTI]

.Stat.(Honors) 1995, in First Division with Distinction. Employment Associate Professor of Statistics, UniversityMoulinath Banerjee Work Address University of Michigan Department of Statistics 439, West Hall 1085 estimation, Statistical Methods in Astronomy, Biomedical studies and Epidemiology, Threshold and boundary

Banerjee, Moulinath

306

Moulinath Banerjee Work Address  

E-Print Network [OSTI]

.Stat.(Honors) 1995, in First Division with Distinction. Employment Associate Professor of Statistics, University Methods in Non­standard Problems. Currently employed as Tenure-track Assistant Professor of StatisticsMoulinath Banerjee Work Address University of Michigan Department of Statistics 439, West Hall 1085

Banerjee, Moulinath

307

Contamination analysis unit  

DOE Patents [OSTI]

The portable Contamination Analysis Unit (CAU) measures trace quantifies of surface contamination in real time. The detector head of the portable contamination analysis unit has an opening with an O-ring seal, one or more vacuum valves and a small mass spectrometer. With the valve closed, the mass spectrometer is evacuated with one or more pumps. The O-ring seal is placed against a surface to be tested and the vacuum valve is opened. Data is collected from the mass spectrometer and a portable computer provides contamination analysis. The CAU can be used to decontaminate and decommission hazardous and radioactive surface by measuring residual hazardous surface contamination, such as tritium and trace organics It provides surface contamination data for research and development applications as well as real-time process control feedback for industrial cleaning operations and can be used to determine the readiness of a surface to accept bonding or coatings.

Gregg, Hugh R. (Livermore, CA); Meltzer, Michael P. (Livermore, CA)

1996-01-01T23:59:59.000Z

308

Contamination analysis unit  

DOE Patents [OSTI]

The portable Contamination Analysis Unit (CAU) measures trace quantities of surface contamination in real time. The detector head of the portable contamination analysis unit has an opening with an O-ring seal, one or more vacuum valves and a small mass spectrometer. With the valve closed, the mass spectrometer is evacuated with one or more pumps. The O-ring seal is placed against a surface to be tested and the vacuum valve is opened. Data is collected from the mass spectrometer and a portable computer provides contamination analysis. The CAU can be used to decontaminate and decommission hazardous and radioactive surfaces by measuring residual hazardous surface contamination, such as tritium and trace organics. It provides surface contamination data for research and development applications as well as real-time process control feedback for industrial cleaning operations and can be used to determine the readiness of a surface to accept bonding or coatings. 1 fig.

Gregg, H.R.; Meltzer, M.P.

1996-05-28T23:59:59.000Z

309

Thermal insulated glazing unit  

SciTech Connect (OSTI)

An improved insulated glazing unit is provided which can attain about R5 to about R10 thermal performance at the center of the glass while having dimensions about the same as those of a conventional double glazed insulated glazing unit. An outer glazing and inner glazing are sealed to a spacer to form a gas impermeable space. One or more rigid, non-structural glazings are attached to the inside of the spacer to divide the space between the inner and outer glazings to provide insulating gaps between glazings of from about 0.20 inches to about 0.40 inches. One or more glazing surfaces facing each thermal gap are coated with a low emissivity coating. Finally, the thermal gaps are filled with a low conductance gas such as krypton gas.

Selkowitz, Stephen E. (Piedmont, CA); Arasteh, Dariush K. (Oakland, CA); Hartmann, John L. (Seattle, WA)

1991-01-01T23:59:59.000Z

310

Thermal insulated glazing unit  

SciTech Connect (OSTI)

An improved insulated glazing unit is provided which can attain about R5 to about R10 thermal performance at the center of the glass while having dimensions about the same as those of a conventional double glazed insulated glazing unit. An outer glazing and inner glazing are sealed to a spacer to form a gas impermeable space. One or more rigid, non-structural glazings are attached to the inside of the spacer to divide the space between the inner and outer glazings to provide insulating gaps between glazings of from about 0.20 inches to about 0.40 inches. One or more glazing surfaces facing each thermal gap are coated with a low emissivity coating. Finally, the thermal gaps are filled with a low conductance gas such as krypton gas. 2 figs.

Selkowitz, S.E.; Arasteh, D.K.; Hartmann, J.L.

1988-04-05T23:59:59.000Z

311

Putting Dollars to Work  

E-Print Network [OSTI]

the extent to which bacteria are present. If these data demonstrate the need for an assessment of total maximum daily loads, experts in bacterial source tracking will help plan and imple- ment appropriate follow-up. Dairy Compost Utilization... This project addresses the elevated concentrations of ammonia, nitrogen, phosphorus and fecal bacteria found in parts of the North Bosque River, Upper North Bosque River and Leon River. Texas A&M agricultural scientists are working with composters...

Wythe, Kathy

2006-01-01T23:59:59.000Z

312

Design of photovoltaic central power station concentrator array  

SciTech Connect (OSTI)

A design for a photovoltaic central power station using tracking concentrators has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes an advanced Martin Marietta two-axis tracking fresnel lens concentrator. The concentrators are arrayed in 5 MW subfields, each with its own power conditioning unit. The photovoltaic plant output is connected to the existing 115 kV switchyard. The site specific design allows detailed cost estimates for engineering, site preparation, and installation. Collector and power conditioning costs have been treated parametrically.

Not Available

1984-02-01T23:59:59.000Z

313

Energy Management in Olefins Units  

E-Print Network [OSTI]

to the point where waste heat from pyrolysis generates more than enough steam to power the olefins unit recovery section. Furthermore, incorporating gas turbine driven electrical generators or process compressors adds to the utility export potential of the unit...

Wells, T. A.

1982-01-01T23:59:59.000Z

314

COMMUNITY AND EDAPHIC ANALYSIS OF MIXED OAK FORESTS IN RIDGE AND VALLEY PROVINCE OF CENTRAL PENNSYLVANIA  

E-Print Network [OSTI]

COMMUNITY AND EDAPHIC ANALYSIS OF MIXED OAK FORESTS IN RIDGE AND VALLEY PROVINCE OF CENTRAL). In this study, mixed oak stands on nine different physiographic units in the Ridge and Valley Province PENNSYLVANIA Gregory J. Nowacki and Marc D. Abrams 1 Abstract: Forty-two relatively undisturbed mixed oak

Abrams, Marc David

315

Optimisation du rseau de transfert thermique des centrales solaires convertisseurs hliothermiques distribus.  

E-Print Network [OSTI]

energy into heat ; the fluid transport network, between collectors and the central production unit, these graphs are used for different sizes of power plants in three cases of energy production : heat, electricity, and « total energy » production. The optimal and maximal size of these types of power plants

Paris-Sud XI, Université de

316

United States Government  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C.Green River,TheEPAJ60014-90101681278 United

317

Summary Max Total Units  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy Strain Rate4 Recovery Act/BuySummary Max Total Units *If All

318

UNITED STATES OF AMERICA  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of EnergyProgram2-26 Date:CharterDepartmentDOE LM issued theUNITED STATES

319

l UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545 OCTTO:March_ ,' .' ft. n.-_ ._UNITED

320

UNITED STATES OF AMERICA  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwo New Energyof Energy8, UNITED STATES DEPARTMENT

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

UNITED STATES DEPARTMENT OF ENERGY  

Broader source: Energy.gov (indexed) [DOE]

on the interfaces between western, central and eastern PJM and at various transformer sites in Pennsylvania. The most significant congestion occurred in the following...

322

FISHERY STATISTICS E UNITED STATES  

E-Print Network [OSTI]

SH 11 .A443X FISH FISHERY STATISTICS E UNITED STATES ^ 1951 &ch 3. \\§^ ^/'· m:^ STATISTICAL DIGEST. Farley, Director Statistical Digest 30 FISHERY STATISTICS OF THE UNITED STATES 1951 BY A. W. ANDERSON;Fishery Statistics of the United States and Alaska are compiled and published annually to make available

323

Working Together | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and MaterialsWenjun1 Table 1.14 SalesWorkerWorkforce1:Working

324

Fermilab at Work | Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibility ofSmall Works:OklahomaatWayne State University

325

Trails Working Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layered NbS2Topo II: An EnzymePersonalTracking LivingTrailerWorking

326

Work/Life Balance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies | Blandine Jerome Careers at WIPPCompletesWork/Life Balance

327

Working with Us | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies | Blandine Jerome Careers atWorking with Us Overview Proposal

328

Universidad Central de Venezuela Facultad de Ciencias  

E-Print Network [OSTI]

Universidad Central de Venezuela Facultad de Ciencias Escuela de Computación Lecturas en Ciencias-02 Centro CCCT Caracas, Abril, 2007. #12;Universidad Central de Venezuela Facultad de Ciencias Escuela de

Raydan, Marcos

329

Floating atomic central heating-and-power plant converted from a strategic submarine  

SciTech Connect (OSTI)

In accordance with {open_quotes}The Treaty on the Reduction of Strategic Offensive Arms{close_quotes} signed in July 1991, the operations envisages by {open_quotes}The Procedures for elimination of SSBN`s Launchers{close_quotes} should be accomplished at submarines of the second generation both by eliminating missile compartments together with launchers and by removal of launchers only from missile compartments. THe number of such ships could reach 30 units as has been forecasted for the year of 1998 inclusive. With regard to the fact that the remaining operation life of the main power plant equipment of a nuclear submarine decommissioned in accordance with the Treaty is about 50 per cent, potentially there is a possibility to convert them into floating atomic central heating-and-power plants. The latter variant envisaged in the {open_quotes}Procedures...{close_quotes} is preferable for developing a floating plant based on ships decommissioned from the Navy, since it permits to remove launchers without cutting and subsequent connection of main cables, pipelines and systems which provide the control of the main power plant, nuclear safety, radiological safety, damage control and fire safety of the floating plant. A submarine could be delivered for refitting into a floating plant only after accomplishing the works envisaged by the {open_quotes}Procedures...{close_quotes}.

Bilashenko, V.P.; Gorigledzhan, E.A.; Slonimsky, V.J. [Military Regiment Nl., Moscow (Russian Federation)

1993-12-31T23:59:59.000Z

330

Program Building Committee's Central Planning Group.  

E-Print Network [OSTI]

Tooe ZTA245.7 8873 Y)O./3~ The Texas A&M (stem r ultural ~ion ~ervrce Damet C Plannstlel. Director College Stallon Program Building Committee's CENTRAL PLANNING GROUP 8-1344 Authors: Burl B. Richardson , Extension Program Specialist... and Mary G. Marshall, Extension Program Specialist Program -Building Committee's CENTRAL PLANNING GROUP This leaflet describes the role of the central planning group in the program development process_ The central planning group is the highest...

Richardson, Burl B.; Marshall, Mary G.

1982-01-01T23:59:59.000Z

331

Building America Webinar: Retrofitting Central Space Conditioning...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Control strategies to improve hydronic space heating performance Building America Webinar: Retrofitting Central Space Conditioning Strategies for Multifamily Buildings - Control...

332

Building America Webinar: Retrofitting Central Space Conditioning...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Introduction Building America Webinar: Retrofitting Central Space Conditioning Strategies for Multifamily Buildings - Introduction This presentation serves as the introduction to...

333

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY GENERATION .............................................................................13 Definition of Levelized Cost ........................................................................................................13 Levelized Cost Components

334

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY GENERATION............................................................ 3 Definition of Levelized Cost.................................................................................... 3 Levelized Cost Categories

Laughlin, Robert B.

335

United States of Agriculture  

E-Print Network [OSTI]

was with the General Electric Co. and worked on thermal and nuclear instrumentation from 1951 to 1961. His B.S. degree Station Ogden, UT 84401 General Technical Report INT-122 April 1982 Aids to Determining Fuel Models Forest Service Intermountain Forest and Range Experiment Station Ogden, UT 84401 General Technical Report

336

CENTRAL EUROPE MANAGING AUTHORITY CITY OF VIENNA  

E-Print Network [OSTI]

CENTRAL EUROPE MANAGING AUTHORITY CITY OF VIENNA Municipal Department for European affairs (MA 27 PROGRAMME Thematic study: Energy efficiency and renewable energies in the CENTRAL EUROPE Programme Request European regions more competitive, innovative, attractive and accessible. The Central Europe Programme area

Genova, Università degli Studi di

337

Universidad Central de Venezuela Facultad de Ciencias  

E-Print Network [OSTI]

Universidad Central de Venezuela Facultad de Ciencias Escuela de Computación Una herramienta para. Universidad Central de Venezuela. {ecoto, hnavarro, omaira}@opalo.ciens.ucv.ve **Laboratorio TOOLS. Escuela de Computación. Facultad de Ciencias. Universidad Central de Venezuela. amatteo@isys.ciens.ucv.ve Caracas, Enero

Coto, Ernesto

339

Beowawe Bottoming Binary Unit - Final Technical Report for EE0002856  

SciTech Connect (OSTI)

This binary plant is the first high-output refrigeration based waste heat recovery cycle in the industry. Its working fluid is environmentally friendly and as such, the permits that would be required with a butane based cycle are not necessary. The unit is modularized, meaning that the unit’s individual skids were assembled in another location and were shipped via truck to the plant site. This project proves the technical feasibility of using low temperature brine The development of the unit led to the realization of low temperature, high output, and environmentally friendly heat recovery systems through domestic research and engineering. The project generates additional renewable energy for Nevada, resulting in cleaner air and reduced carbon dioxide emissions. Royalty and tax payments to governmental agencies will increase, resulting in reduced financial pressure on local entities. The major components of the unit were sourced from American companies, resulting in increased economic activity throughout the country.

McDonald, Dale Edward

2013-02-12T23:59:59.000Z

340

Gamma Ray Burst Central Engines  

E-Print Network [OSTI]

I review aspects of the theory of long-duration gamma-ray burst (GRB) central engines. I focus on the requirements of any model; these include the angular momentum of the progenitor, the power, Lorentz factor, asymmetry, and duration of the flow, and both the association and the non-association with bright supernovae. I compare and contrast the collapsar and millisecond proto-magnetar models in light of these requirements. The ability of the latter model to produce a flow with Lorentz factor ~100 while simultaneously maintaining a kinetic luminosity of ~10^50 ergs/s for a timescale of ~10-100 s is emphasized.

Todd A. Thompson

2008-07-04T23:59:59.000Z

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

central | OpenEI Community  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop,SaveWhiskey Flats GeothermalElectric Coop Home Homebuilding6central

342

Working Group Report: Sensors  

SciTech Connect (OSTI)

Sensors play a key role in detecting both charged particles and photons for all three frontiers in Particle Physics. The signals from an individual sensor that can be used include ionization deposited, phonons created, or light emitted from excitations of the material. The individual sensors are then typically arrayed for detection of individual particles or groups of particles. Mounting of new, ever higher performance experiments, often depend on advances in sensors in a range of performance characteristics. These performance metrics can include position resolution for passing particles, time resolution on particles impacting the sensor, and overall rate capabilities. In addition the feasible detector area and cost frequently provides a limit to what can be built and therefore is often another area where improvements are important. Finally, radiation tolerance is becoming a requirement in a broad array of devices. We present a status report on a broad category of sensors, including challenges for the future and work in progress to solve those challenges.

Artuso, M.; et al.,

2013-10-18T23:59:59.000Z

343

How NIF Works  

SciTech Connect (OSTI)

The National Ignition Facility, located at Lawrence Livermore National Laboratory, is the world's largest laser system... 192 huge laser beams in a massive building, all focused down at the last moment at a 2 millimeter ball containing frozen hydrogen gas. The goal is to achieve fusion... getting more energy out than was used to create it. It's never been done before under controlled conditions, just in nuclear weapons and in stars. We expect to do it within the next 2-3 years. The purpose is threefold: to create an almost limitless supply of safe, carbon-free, proliferation-free electricity; examine new regimes of astrophysics as well as basic science; and study the inner-workings of the U.S. stockpile of nuclear weapons to ensure they remain safe, secure and reliable without the need for underground testing. More information about NIF can be found at:

2009-07-30T23:59:59.000Z

344

How NIF Works  

ScienceCinema (OSTI)

The National Ignition Facility, located at Lawrence Livermore National Laboratory, is the world's largest laser system... 192 huge laser beams in a massive building, all focused down at the last moment at a 2 millimeter ball containing frozen hydrogen gas. The goal is to achieve fusion... getting more energy out than was used to create it. It's never been done before under controlled conditions, just in nuclear weapons and in stars. We expect to do it within the next 2-3 years. The purpose is threefold: to create an almost limitless supply of safe, carbon-free, proliferation-free electricity; examine new regimes of astrophysics as well as basic science; and study the inner-workings of the U.S. stockpile of nuclear weapons to ensure they remain safe, secure and reliable without the need for underground testing. More information about NIF can be found at:

None

2010-09-01T23:59:59.000Z

345

2013 Reporting Unit Codes | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2013 Reporting Unit Codes 2013 Reporting Unit Codes CFC Reporting Unit Codes 2013.pdf More Documents & Publications EA-0372: Final Environmental Assessment Alignment: Achieving...

346

Central Equatorial Pacific Experiment (CEPEX)  

SciTech Connect (OSTI)

The Earth's climate has varied significantly in the past, yet climate records reveal that in the tropics, sea surface temperatures seem to have been remarkably stable, varying by less than a few degrees Celsius over geologic time. Today, the large warm pool of the western Pacific shows similar characteristics. Its surface temperature always exceeds 27[degree]C, but never 31[degree]C. Heightened interest in this observation has been stimulated by questions of global climate change and the exploration of stabilizing climate feedback processes. Efforts to understand the observed weak sensitivity of tropical sea surface temperatures to climate forcing has led to a number of competing ideas about the nature of this apparent thermostat. Although there remains disagreement on the processes that regulate tropical sea surface temperature, most agree that further progress in resolving these differences requires comprehensive field observations of three-dimensional water vapor concentrations, solar and infrared radiative fluxes, surface fluxes of heat and water vapor, and cloud microphysical properties. This document describes the Central Equatorial Pacific Experiment (CEPEX) plan to collect such observations over the central equatorial Pacific Ocean during March of 1993.

Not Available

1993-01-01T23:59:59.000Z

347

CONVERT 15 WELLS TO BORS PUMPING UNITS AND TEST/COMPARE TO CONVENTIONAL UNITS  

SciTech Connect (OSTI)

A new type of fluid lifting equipment called Balanced Oil Recovery System (trade named BORS Lift{trademark}) was installed on several idle oil wells to demonstrate the operating efficiency of this innovative equipment technology. The BORS Lift system is designed to bring oil to the surface without the accompanying formation water. The BORS Lift system uses an innovative strap mechanism that takes oil from the top of the downhole oilwater column and lifts it to the surface, eliminating production of the formation water. Eliminating salt water production could potentially increase oil production, reduce operational costs, benefit the environment, and cut salt water disposal costs. Although the BORS Lift units did not function as intended, lessons learned during the course of the field demonstration project resulted in improvements in the technology and redesign of subsequent generation BORS Lift units which are reported to have significantly improved their performance characteristics. BORS Lift units were installed on 15 temporarily abandoned wells which had been shut down due to low oil production, high water production, and uneconomic operating conditions. The wells had been producing with artificial lift at a high watercut from a shallow (850-900 feet), pressure depleted oil sand reservoir prior to being shut down. The electrical motor driven BORS Lift units provided a possible approach for economically returning the shallow, low-volume oil wells to production. The BORS Lift units used in this field demonstration were designed to recover up to roughly 22 barrels of fluid per day from depths ranging to 1,700 feet, ideal for many marginal stripper well operations. The BORS units were first-production-model test units, operated under oil field conditions for the first time, and were naturally expected to experience some design problems. From the onset, the operator experienced mechanical, design, and operational problems with the BORS Lift units and was unable to maintain un-interrupted production operations. The inventor provided considerable on-site technical support in an ongoing effort to correct the problems with the units and the inventor worked extensively with the operator to make design and manufacturing changes to the units to try to improve their reliability and performance. The operational problems were mostly related to the durability of the various components under oil field operating conditions such as inadequate mechanical, electrical, and electronic design for rough service, extended operation, and severe weather conditions. During the course of the demonstration project, it further appeared that the producing formation lacked sufficient reservoir energy and/or favorable oil properties to mobilize and displace oil from the formation into the well bore in order to recharge the oil column in the well. The BORS Lift units were then moved to a second lease which appeared to have more favorable WTI quality oil properties. Eight of these units were reported to have been installed and placed in operation on the second lease, however, operational difficulties continued. It was determined that the units were inadequately designed and would need to be replace by improved second generation units. Due to the lack of success with the first generation units and the extra cost to replace them with the redesigned units, the operators decided not to continue with the project and the project was terminated at that point.

Walter B. North

2003-02-04T23:59:59.000Z

348

Central Hudson Gas and Electric (Electric)- Commercial Lighting Rebate Program  

Broader source: Energy.gov [DOE]

Central Hudson Gas and Electric's (Central Hudson) Commercial Lighting Rebate Program is for businesses, retailers, institutional customers and non-profit customers of Central Hudson. The progam...

349

Determining benefits and costs of improved central air conditioner efficiencies  

E-Print Network [OSTI]

Products: Central Air Conditioners and Heat Pumps Energyof Improved Central Air Conditioner Efficiencies Authorsresidential-type central air conditioner energy-efficiency

Rosenquist, G.

2010-01-01T23:59:59.000Z

350

UNIT NUMBER SWMU 175 UNIT NAME: Concrete Rubble Pile (28...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

75 UNIT NAME: Concrete Rubble Pile (28) REGULATORY STATUS: AOC LOCATION: Outside Security Fence, East of C-360 Building in KPDES Outfall Ditch 002. APPROXIMATE DIMENSIONS: 400 ft...

351

Aerial Work Platform Safety Program  

E-Print Network [OSTI]

Aerial Work Platform Safety Program Updated: July 22, 2013 #12;Aerial Work Platform Safety Program ..........................................................................................................11 #12;Aerial Work Platform Safety Program 1 The official version of this information will only for establishing and maintaining the Aerial Work Platform Safety Program. Appropriate safety equipment (e

Holland, Jeffrey

352

High Temperature Membrane Working Group  

Broader source: Energy.gov [DOE]

This presentation provides an overview of the High Temperature Membrane Working Group Meeting in May 2007.

353

Video Shoot Scope of Work  

Broader source: Energy.gov [DOE]

Video Shoot Scope of Work, from the Tool Kit Framework: Small Town University Energy Program (STEP).

354

Work Experience Guidance for Managers  

E-Print Network [OSTI]

Work Experience Guidance for Managers When approached with a request for work experience, managers. Any queries regarding CRB checks should be directed to your designated HR Manager. When a work any work, paid or unpaid: Before 7am or after 7pm For more than two hours on a school day or Sunday

355

Will NIF Work  

E-Print Network [OSTI]

It is vital that new clean and abundant sources of energy be developed for the sustainability of modern society. Nuclear fusion of the hydrogen isotopes deuterium and tritium, if successful, might make a major contribution toward satisfying this need. The U.S. has an important effort aimed at achieving practical inertial confinement fusion, ICF, which has been under development for decades at the Lawrence Livermore National Laboratory. The National Ignition Facility (NIF) is a giant laser to multiply-shock and thus quasi-isentropically compress a capsule of deuterium-tritium (DT) to high density and temperature, where the fusion rate is proportional to density squared times temperature to the fourth power. The principal problem that must be solved for NIF to work successfully is elimination of the Rayleigh-Tailor (R-T) instability that originates from the interface between the solid shell and the DT fuel within it. The R-T instability poisons the fusion reaction by reducing the temperature of the DT achieved ...

Nellis, W J

2009-01-01T23:59:59.000Z

356

Robin M. Kohn University of Central Florida School of Social Work  

E-Print Network [OSTI]

Altamonte Springs, Florida Lucerne Medical Center Lucerne Rehabilitation & Spinal Center Orlando, Florida

Van Stryland, Eric

357

Huge natural gas reserves central to capacity work, construction plans in Iran  

SciTech Connect (OSTI)

Questions about oil production capacity in Iran tend to mask the country's huge potential as a producer of natural gas. Iran is second only to Russia in gas reserves, which National Iranian Gas Co. estimates at 20.7 trillion cu m. Among hurdles to Iran's making greater use of its rich endowment of natural gas are where and how to sell gas not used inside the country. The marketing logistics problem is common to other Middle East holders of gas reserves and a reason behind the recent proliferation of proposals for pipeline and liquefied natural gas schemes targeting Europe and India. But Iran's challenges are greater than most in the region. Political uncertainties and Islamic rules complicate long-term financing of transportation projects and raise questions about security of supply. As a result, Iran has remained mostly in the background of discussions about international trade of Middle Eastern gas. The country's huge gas reserves, strategic location, and existing transport infrastructure nevertheless give it the potential to be a major gas trader if the other issues can be resolved. The paper discusses oil capacity plans, gas development, gas injection for enhanced oil recovery, proposals for exports of gas, and gas pipeline plans.

Not Available

1994-07-11T23:59:59.000Z

358

University of Central Florida Students' Energy Saving Work Showcased in New  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' Research Petroleum ReserveDepartment ofEnergy, OfficeDepartment ofDepartment of

359

Solid Oxide Fuel Cell Auxiliary Power Unit  

SciTech Connect (OSTI)

Solid Oxide Fuel Cell (SOFC) is an attractive, efficient, clean source of power for transportation, military, and stationary applications. Delphi has pioneered its application as an auxiliary Power Unit (APU) for transportation. Delphi is also interested in marketing this technology for stationary applications. Its key advantages are high efficiency and compatibility with gasoline, natural gas and diesel fuel. It's consistent with mechanizations that support the trend to low emissions. Delphi is committed to working with customers and partners to bring this novel technology to market.

J. Weber

2001-12-12T23:59:59.000Z

360

4-H Favorite Foods Unit 1.  

E-Print Network [OSTI]

for this unit: 1. Prepare and serve one food from each of these groups olte time or more. Candy Snacks Desserts Main dishes Breads Salads Drinks Vegetables Fruit Set the table five times or more. Help serve meals five times or more. Plan, prepare... and other equipment in the kitchen. 7. Learn to work safely. 8. Learn the best way to wash dishes and clean up the kitchen. 0 Learn to eat the foods listed on the Texas Food Standard. Keep your food record up to date. Exhibit one food you learned...

Cox, Maeona; Mason, Louise; Reasonover, Frances; Tribble, Marie

1958-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Central solar-energy receiver  

DOE Patents [OSTI]

An improved tower-mounted central solar energy receiver for heating air drawn through the receiver by an induced draft fan is described. A number of vertically oriented, energy absorbing, fin-shaped slats are radially arranged in a number of concentric cylindrical arrays on top of the tower coaxially surrounding a pipe having air holes through which the fan draws air which is heated by the slats which receive the solar radiation from a heliostat field. A number of vertically oriented and wedge-shaped columns are radially arranged in a number of concentric cylindrical clusters surrounding the slat arrays. The columns have two mirror-reflecting sides to reflect radiation into the slat arrays and one energy absorbing side to reduce reradiation and reflection from the slat arrays.

Not Available

1981-10-27T23:59:59.000Z

362

The energy situation in five Central American countries  

SciTech Connect (OSTI)

This study describes the energy resources and the changes that have taken place in energy supply and demand in five Central American countries between 1970 and 1984. Economic changes are also reviewed because they influence and are affected by changes in the energy sector. The work was performed under the auspices of the US Agency for International Development. The Central American countries of Costa Rica, El Salvador, Guatemala, Honduras, and Panama are highly dependent on fuel wood as a source of energy, particularly in the residential sector. They also rely upon imported oil products to supply a growing modern sector. Most countries have significant hydroelectric and geothermal resources, and most countries produce a large portion of their electricity from hydroelectric projects. Demand for electricity has grown rapidly. Relative shares of primary versus secondary energy in the five countries vary significantly and strongly correlate with average per capita income. Consumption of secondary energy has declined during the recent economic recession suffered by the region.

Trocki, L.; Booth, S.R.; Umana Q, A.

1987-06-01T23:59:59.000Z

363

Geology of the undeveloped oil and gas fields of Central Offshore Santa Maria Basin, California  

SciTech Connect (OSTI)

Two prominent subsurface structural features of the Central Offshore Santa Maria Basin are the Hosgri fault system and the associated anticlinal fold trend. Exploratory drilling and 3D seismic mapping have delineated a series of oil and gas fields along this trend which underlie four federal units and one non-unitized lease. The units are named after local geography and are called the Lion Rock, Point Sal, Purisima Point and Santa Maria Units. The individual lease, OCS P-0409, overlies the San Miguel field. The Hosgri fault system trends northwest-southeast and effectively forms the eastern boundary of the oil and gas province. Lying semi-parallel with the fault are several anticlinal culminations which have trapped large volumes of oil and gas in the fractured Montery Formation. The Monterey is both source and reservoir rock, averaging 300 meters n thickness throughout the Central Basin. Development of the Monterey Formation as a reservoir rock was through diagensis and tectonism with resulting porosities-from 15 to 20% and permeability up to one Darcy. These parameters coupled with a high geothermal gradient facilitate the inflow rates of the viscous Monterey oil. Some 24 exploration and delineation wells have been drilled in this area and tested at rates ranging from a few hundred to several thousand barrels per day. Estimated oil reserves in the Central Offshore Santa Maria Basin total approximately 1 billion barrels.

Milton, J.D. [CalResources LLC, Bakersfield, CA (United States); Edwards, E.B. [ Ogle & Heck, Carpinteria, CA (United States); Heck, R.G. [Ogle & Heck, Santa Barbara, CA (United States)] [and others

1996-12-31T23:59:59.000Z

364

Geology of the undeveloped oil and gas fields of Central Offshore Santa Maria Basin, California  

SciTech Connect (OSTI)

Two prominent subsurface structural features of the Central Offshore Santa Maria Basin are the Hosgri fault system and the associated anticlinal fold trend. Exploratory drilling and 3D seismic mapping have delineated a series of oil and gas fields along this trend which underlie four federal units and one non-unitized lease. The units are named after local geography and are called the Lion Rock, Point Sal, Purisima Point and Santa Maria Units. The individual lease, OCS P-0409, overlies the San Miguel field. The Hosgri fault system trends northwest-southeast and effectively forms the eastern boundary of the oil and gas province. Lying semi-parallel with the fault are several anticlinal culminations which have trapped large volumes of oil and gas in the fractured Montery Formation. The Monterey is both source and reservoir rock, averaging 300 meters n thickness throughout the Central Basin. Development of the Monterey Formation as a reservoir rock was through diagensis and tectonism with resulting porosities-from 15 to 20% and permeability up to one Darcy. These parameters coupled with a high geothermal gradient facilitate the inflow rates of the viscous Monterey oil. Some 24 exploration and delineation wells have been drilled in this area and tested at rates ranging from a few hundred to several thousand barrels per day. Estimated oil reserves in the Central Offshore Santa Maria Basin total approximately 1 billion barrels.

Milton, J.D. (CalResources LLC, Bakersfield, CA (United States)); Edwards, E.B. ( Ogle Heck, Carpinteria, CA (United States)); Heck, R.G. (Ogle Heck, Santa Barbara, CA (United States)) (and others)

1996-01-01T23:59:59.000Z

365

Late-Middle to Late Devonian (Givetian-Famennian) tectonic and stratigraphic history of central Kentucky  

SciTech Connect (OSTI)

Earliest Givetian deposition in central Kentucky is represented in upper parts of the Boyle and Sellersburg formations and reflects marginal-marine to shallow-marine carbonate deposition at the end of the second tectophase of the Acadian orogeny. Inception of the third tectophase of the Acadian orogeny in the area is reflected by a disconformity or angular unconformity between the Boyle and New Albany formations, by reactivation of faults on the Kentucky river and related fault zones, and by concurrent graben formation. Succeeding late Givetian deposition is represented by the equivalent Portwood and Blocher members of the New Albany. The Portwood represents localized deposition of dolomitic breccias and black shales in grabens and half grabens, paleogeographically manifest as a series of restricted coastal lagoons and estuaries in central and east-central Kentucky. In contrast, dolomitic, Blocher black shales in west-central kentucky, beyond the effects of faulting, reflect more open, platform-lagoonal conditions. Both units are carbonate rick, contain a sparse benthic fauna, and had local sources of sediment. By latest Givetian or earliest Frasnian, local basins were largely filed, and when local sediment sources were inundated by transgression, sediment starvation, represented by a major lag zone or bone bed, ensued throughout central Kentucky, while black- and gray-shale deposition continued in deeper parts of the Illinois and Appalachian basins. During the Frasnian and early Famennian, as subsidence and transgression continued, deeper water gray- and black-shale units from the Appalachian and Illinois basins slowly onlapped the Cincinnati Arch area of central Kentucky; black shales in these units are fissile and lack both carbonates and benthic fauna. At the Devonian-Mississippian transition, however, a locally developed unconformity and structurally related erosion probably reflect inception of the fourth and final tectophase of the Acadian orogeny.

Ettensohn, F.R. (Univ. of Kentucky, Lexington, KY (United States). Dept. of Geological Sciences); Barnett, S.F. (Bryan Coll., Dayton, TN (United States)); Norby, R.D. (Illinois State Geological Survey, Champaign, IL (United States))

1994-04-01T23:59:59.000Z

366

Late Pennsylvanian cyclic sedimentary units of the Brownwood area, north-central Texas  

E-Print Network [OSTI]

of these sediments. However, sh1fting sediment sources do play a m1nor role in creating variations within each cycle. ACKNOWLEDGEMENTS I would like to thank Dr. Thomas E. Yancey, my committee chai r- man, for his geologic advice and guidance, both general.... The dual limestone cycle has a generalized lithologic sequence, in ascending order, of 1) nonmarine and/or shoreline clastics; 2) transgressive limestone; 3) marine shales, which may include phosphatic shales; 4) regressive limestone; 5) nonmarine...

Hojnacki, Robert Stephen

1986-01-01T23:59:59.000Z

367

Seismic Survey Report for Central Nevada Test Area, Subsurface, Correction Action Unit 443, Revision 1  

SciTech Connect (OSTI)

The seismic survey was successful in imaging the water table and underlying structures at the site. The configuration of the water table reflector confirms the general southeast horizontal flow direction in the alluvial aquifer. Offsets in the water table reflector, both at known faults that reach the surface and at subsurface faults not previously recognized, indicate that both extension and blast-related faults are barriers to lateral groundwater flow. The results from this study have been used to optimally locate two new wells designed to monitor head levels and possible contaminant migration in the alluvial aquifer at CTNA.

None

2008-12-19T23:59:59.000Z

368

Convective cell bands in the central and eastern United States as observed by radar  

E-Print Network [OSTI]

-68, 10 cm, 700 KW, Tinker APSE Oklahoma Data: 27-28 April 1955 Synoptic Situation At 2130C/27, a cold front lay 60 miles northwest of Tinker AFS (Fig. 2). An old prefrontal instability line is shown 100 miles to the southeast Streamline charts...: CFS 6B ~ 10 cm, 700 KM, Tinker AFBg Oklahoma Date: 20 anarch 1955 Synoptic Situation The 1530C surface chez't (Fig. 14) shows a cold front 70 miles northwest of Tinker AFB corresponding to the location of the call bend at this time on the 1530C...

Leach, Wayne

2012-06-07T23:59:59.000Z

369

An International Periodical Promoting Conservation and Biodiversity Southwestern United States--Mexico--Central America  

E-Print Network [OSTI]

habitat as opposed to being philopatric to a single pond (Fortuna et al., 2006). Researchers studying of amphibian populations in stochastic environments (Fortuna et al., 2006). We hypothesize that if this model

Griffis-Kyle, Kerry

370

Economic Consequences of Alternative Solution Methods for Centralized Unit Commitment in Day-Ahead Electricity Markets  

E-Print Network [OSTI]

have led several ISOs, such as PJM, to implement MIP-basedsolution found is optimal. PJM, for instance, allows its MIPbe employed. Nonetheless, PJM currently relies on B&B, and

Sioshansi, Ramteen; O'Neill, Richard; Oren, Shmuel S

2008-01-01T23:59:59.000Z

371

Economic Consequences of Alternative Solution Methods for Centralized Unit Commitment in Day-Ahead Electricity Markets  

E-Print Network [OSTI]

commitment in competitive electricity markets,” Util. Pol. ,of market design,” in Electricity Market Reform: Anrestructured competitive electricity markets. and variable

Sioshansi, Ramteen; O'Neill, Richard; Oren, Shmuel S

2008-01-01T23:59:59.000Z

372

Cloud-to-ground lightning-precipitation relationships in the South Central United States  

E-Print Network [OSTI]

, none of which has been conclusively proven (Dong and Hallett 1992). A discussion of the full physics is beyond the scope of this review, however, some important observations are necessary. One explanation for the charge separation mechanism... ~ ' + (i) Figure 2. Schematic of a typical lightning discharge. See text for explauadou. (Adapted from M. A. Uman, Understanding Lightning, BEK Technical Pub. , pp. 74-75, 78-79. ) (Figure 2f). The stepped leader and the upward discharge meet...

Sheridan, Scott Christopher

2012-06-07T23:59:59.000Z

373

An Updated Central and Eastern United States Ground-Motion Model |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South42.2 (April 2012) 1 Documentation andEnergy|

374

Textures and conditions of formation of Middle Pennsylvanian coal balls, central United States  

E-Print Network [OSTI]

ball zones is given in Table 1. TABLE 1.—List of Localities Sampled. [Locations shown in Figure 1.] LOCALITY NO. ZONE AND DESCRIPTION 1 Welch Locality 1 (Mineral Coal); NW1/4 SW1/4 sec. 27, R. 20 E., T. 28 N., Craig Co., Okla.; 4.5 mi (6 km) west..., R. 20 E., T. 28 N., Craig Co., Okla.; 5 mi (7 km) northwest of Welch. Active strip pit. 4 Vinita Locality (Iron Post Coal), Peabody Coal Company. Tipple area: sec. 5, R. 18 E., T. 25 N., Craig Co., Okla. Strip pits: sec. 31, R. 18 E., T. 26 N...

Perkins, T. W.

1976-04-30T23:59:59.000Z

375

Heat Flow And Geothermal Potential In The South-Central United States |  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:Photon Place:NetHealth Division |Hays,Community College Jump

376

June 2012 Groundwater Sampling at the Central Nevada Test Area (Data Validation Package)  

SciTech Connect (OSTI)

The U.S. Department of Energy Office of Legacy Management conducted annual sampling at the Central Nevada Test Area (CNTA) on June 26-27, 2012, in accordance with the 2004 Correction Action Decision Document/Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area (CNTA)-Subsurface and the addendum to the "Corrective Action Decision Document/Corrective Action Plan" completed in 2008. Sampling and analysis were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PLN/S04351), continually updated).

None

2013-03-01T23:59:59.000Z

377

May 2011 Groundwater Sampling at the Central Nevada Test Area (Data Validation Package)  

SciTech Connect (OSTI)

The U.S. Department of Energy Office of Legacy Management conducted annual sampling at the Central Nevada Test Area (CNTA) on May 10-11, 2011, in accordance with the 2004 Correction Action Decision Document/Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area (CNTA)-Subsurface and the addendum to the "Corrective Action Decision Document/Corrective Action Plan" completed in 2008. Sampling and analysis were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PLN/S04351), continually updated).

None

2011-11-01T23:59:59.000Z

378

May 2010 Groundwater Sampling at the Central Nevada Test Area (Data Validation Package)  

SciTech Connect (OSTI)

The U.S. Department of Energy Office of Legacy Management conducted annual sampling at the Central Nevada Test Area (CNTA) on June 7-9, 2010, in accordance with the 2004 Correction Action Decision Document/Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area (CNTA)-Subsurface. Sampling and analysis were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PLN/S04351), continually updated).

None

2011-02-01T23:59:59.000Z

379

Central Invariants of the Constrained KP Hierarchies  

E-Print Network [OSTI]

We compute the central invariants of the bihamiltonian structures of the constrained KP hierarchies, and show that these integrable hierarchies are topological deformations of their hydrodynamic limits.

Si-Qi Liu; Youjin Zhang; Xu Zhou

2015-02-06T23:59:59.000Z

380

Fire hazards analysis of central waste complex  

SciTech Connect (OSTI)

This document analyzes the fire hazards associated with operational the Central Waste Complex. It provides the analysis and recommendations necessary to ensure compliance with applicable fire codes.

Irwin, R.M.

1996-05-30T23:59:59.000Z

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Central Moloney: Noncompliance Determination (2013-SE-4702) ...  

Broader source: Energy.gov (indexed) [DOE]

Determination to Central Moloney, Inc. finding that liquid-immersed distribution transformer basic models 30300150 and 32500095 do not comport with the energy conservation...

382

East Central Electric Cooperative- Residential Rebate Program  

Broader source: Energy.gov [DOE]

East Central Electric Cooperative offers rebates to residential customers to install energy-efficient ground source heat pumps, electric water heaters, and appliances. To qualify for the rebate...

383

NRC allows TVA to resume construction on unit 1  

SciTech Connect (OSTI)

The article very briefly describes the construction status of the Tennessee Valley Authority (TVA) Watts Bar Nuclear Plant unit 1. The project was halted by TVA for two years due to quality assurance issues. The US Nuclear Regulatory Commission approved resumption of work, noting that corrective actions were adequate. The status of other TVA reactors is also noted.

NONE

1992-01-01T23:59:59.000Z

384

Flexible Work Arrangements Manager Guidelines  

E-Print Network [OSTI]

Flexible Work Arrangements Manager Guidelines The Ohio State University Office of Human Resources Page 1 of 2 Flexible Work Arrangement ­ Manager Assessment Issued 07/15/10 When you receive a proposal your manager to review for a decision. Remember that granting a flexible work arrangement may help

Jones, Michelle

385

Water Resources Working Group Report  

E-Print Network [OSTI]

Water Resources Working Group Report This report provided content for the Wisconsin Initiative in February 2011. #12;Water Resources Working Group Wisconsin Initiative on Climate Change Impacts October 2010 #12;Water Resources Working Group Members ­ WICCI Tim Asplund (Co-Chair) - Wisconsin Department

Sheridan, Jennifer

386

Indexes of pumps for oil field pumping units  

SciTech Connect (OSTI)

As reported previously, a series of oil field pumping units has been developed with power outputs of 125, 250, 500, and 1000 kW, designed for injecting working fluids in cementing operations in oil and gas wells, hydraulic fracturing of formations, washing out sand plugs, and other production operations. The units are designed for the use of three-plunger pumps with individual power outputs of 125 or 500 kW. In the 250- and 1000-kW units, two such pumps are used. The 1000-kW pumping unit serves mainly for deep-penetration hydraulic fracturing of formations, and also for fracturing deep formations. The hydraulic fracturing process does not require the use of units with two pumps; this has been demonstrated by experience, both here and in other countries. All units intended for use in hydraulic fracturing are built with a single pump, transmission, and drive. Pumping units for well cementing must have two pumps that will give a high delivery rate. At the start of the operation, a single pump can be used to feed water into the cement mixer, with the second pump used to transfer the cement slurry to the well. Then both pumps are connected to the slurry injection line. The operation of these pumps is described.

Ibragimov, E.S.

1995-07-01T23:59:59.000Z

387

Printed in the United States of America. Available from National Technical Information Service  

E-Print Network [OSTI]

.1.4 Split vs Package Unit Shipments/Applications 25 4.1.5 Residential vs Commercial Heat Pump 27.1.9 Total Residential Central Heating/Cooling 37 System Installations by Region 4.1.10 Heat Pump Shipments-95d ADVANCED ELECTRIC HEAT PUMP MARKET AND BUSINESS ANALYSIS FINAL REPORT J. C. Kastovich, Program

Oak Ridge National Laboratory

388

Corrective Action Management Units and Temporary Units. RCRA Information Brief  

SciTech Connect (OSTI)

On February 16, 1993 the EPA published a final rule that allows either the EPA Regional Administrator or the authorized State to designate areas as corrective action management units (CAMUs) at hazardous waste management facilities for the specific purpose of managing remediation waste that has been generated as part of the facility`s corrective action activities. According to the rule, placement of remediation wastes into or within a CAMU does not constitute land disposal of hazardous waste and is not subject to RCRA land disposal restrictions. In addition, waste disposal units located within CAMUs are not required to be designed in accordance with RCRA minimum technological requirements applicable to land disposal units. This Information Brief explains the advantages of a CAMU designation, defines a Temporary Unit (TU) and explains the advantages of a TU designation. The process for initiating a CAMU or TU designation is described for DOE sites and interim status facilities.

Not Available

1994-03-01T23:59:59.000Z

389

Advanced Unit Commitment Strategies in the United States Eastern Interconnection  

SciTech Connect (OSTI)

This project sought to evaluate the impacts of high wind penetrations on the U.S. Eastern Interconnection and analyze how different unit commitment strategies may affect these impacts.

Meibom, P.; Larsen, H. V.; Barth, R.; Brand, H.; Tuohy, A.; Ela, E.

2011-08-01T23:59:59.000Z

390

Lessons Learned in Optimizing Workers' and Worker Representatives' Input to Work Planning and Control  

Broader source: Energy.gov [DOE]

Slide Presentation by Tom McQuiston, Dr. P.H., United Steelworkers - Tony Mazzocchi Center for Health, Safety and Environmental Education. Lessons Learned in Optimizing Workers’ and Worker Representatives’ Input in Work Planning and Control.

391

33 CFR 322: Permits for Structures or Work in or Affecting Navigable...  

Open Energy Info (EERE)

to library Legal Document- RegulationRegulation: 33 CFR 322: Permits for Structures or Work in or Affecting Navigable Waters of the United StatesLegal Abstract These regulations...

392

14th Annual Conference Central Eurasian  

E-Print Network [OSTI]

: Islam and the State in Central Asia Contemporary Higher Education in Kyrgyzstan and Tajikistan Past, Present and Future of Gender Studies in Central Asia Osh Three Years After: Reordering and Remembering the City Turkey and the EU in the Post-Soviet Space: Security, Energy and Gender Session II 10:15 am - 12

Wisconsin at Madison, University of

393

Time Centrality in Dynamic Complex Networks  

E-Print Network [OSTI]

There is an ever-increasing interest in investigating dynamics in time-varying graphs (TVGs). So far, however, the notion of centrality in TVG scenarios usually refers to metrics that assess the relative importance of nodes along the temporal evolution of the network. Nevertheless, for some TVG scenarios, more important than identifying the central nodes under a given definition is identifying the \\emph{key time instants} for taking certain actions. In this paper, we introduce the notion of \\emph{time centrality} in TVGs. Analogously to node centrality, time centrality evaluates the relative importance of time instants in dynamic complex networks. We present two time centrality metrics related to diffusion processes. We evaluate the two defined metrics using a real-world dataset representing a in-person contact dynamic network. We validate the concept of time centrality showing that diffusion starting at the best classified time instants (i.e. the most central ones), according to our metrics, can perform a fa...

Costa, Eduardo Chinelate; Wehmuth, Klaus; Ziviani, Artur; da Silva, Ana Paula Couto

2015-01-01T23:59:59.000Z

394

Universidad Central de Venezuela Facultad de Ciencias  

E-Print Network [OSTI]

Universidad Central de Venezuela Facultad de Ciencias Escuela de Computación Lecturas en Ciencias ecoto@strix.ciens.ucv.ve ecoto@opalo.ciens.ucv.ve Universidad Central de Venezuela. Facultad de Ciencias. Escuela de Computación. Laboratorio de Computación Gráfica (LCG) Venezuela. Caracas Apdo. 47002, 1041-A ND

Coto, Ernesto

395

Universidad Central de Venezuela Facultad de Ciencias  

E-Print Network [OSTI]

Universidad Central de Venezuela Facultad de Ciencias Escuela de Computación Lecturas en Ciencias@lmpa.univ-littoral.fr) Departamento de Computaci´on, Facultad de Ciencias, Universidad Central de Venezuela, Ap. 47002, Caracas 1041-A, Venezuela (mraydan@kuaimare.ciens.ucv.ve). Sponsored by the Center of Scientific Com- puting at UCV. 1 #12

Raydan, Marcos

396

Universidad Central de Venezuela Facultad de Ciencias  

E-Print Network [OSTI]

Universidad Central de Venezuela Facultad de Ciencias Escuela de Computación Lecturas en Ciencias@opalo.ciens.ucv.ve Universidad Central de Venezuela. Facultad de Ciencias. Escuela de Computación. Laboratorio de Computación Gráfica (LCG) Venezuela. Caracas Apdo. 47002, 1041-A. ND 2003-02 Resumen Los grafos son solo abstracciones

Coto, Ernesto

397

Universidad Central de Venezuela Facultad de Ciencias  

E-Print Network [OSTI]

Universidad Central de Venezuela Facultad de Ciencias Escuela de Computación Lecturas en Ciencias ecoto@strix.ciens.ucv.ve ecoto@opalo.ciens.ucv.ve Universidad Central de Venezuela. Facultad de Ciencias. Escuela de Computación. Laboratorio de Computación Gráfica (LCG) Venezuela. Caracas Apdo. 47002, 1041-A

Coto, Ernesto

398

Universidad Central de Venezuela Facultad de Ciencias  

E-Print Network [OSTI]

Universidad Central de Venezuela Facultad de Ciencias Escuela de Computación Lecturas en Ciencias Construcción de Algoritmos Ernesto Coto ecoto@strix.ciens.ucv.ve Universidad Central de Venezuela. Facultad de Ciencias. Escuela de Computación. Laboratorio de Computación Gráfica (LCG) Venezuela. Caracas Apdo. 47002

Coto, Ernesto

399

West Central North East Area of Tucson  

E-Print Network [OSTI]

0 500 1000 1500 2000 2500 3000 West Central North East Area of Tucson #Individuals Anna Broad-billed Costa Rufous Black-chinned 0 500 1000 1500 2000 2500 3000 West Central North East Area of Tucson not be conflicting, and urban areas may actually provide valuable surrogates for degraded habitats. Our knowledge

Hall, Sharon J.

400

Project Work | Tobias Berger | July 2006Page 1 Project Work  

E-Print Network [OSTI]

........................................................................................ 6 1.1.3 Working on the Brand Image ................................................................................................... 6 1.1 Brand Communication in International Collaboration at the Vattenfall Group

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Second United Nations International Conference  

Office of Scientific and Technical Information (OSTI)

Second United Nations International Conference on the Peaceful Uses of Atomic Energy ON THE ANALYSIS O F BUBBLE CHAMBER TRACKS Q Hugh Bradner and F r a n k Solmitz INTRODUCTION A j...

402

United Tribes Tribal Leaders Summit  

Broader source: Energy.gov [DOE]

The United Tribes Technical College is hosting its 16th Annual Tribal Leaders Summit in Bismarck, North Dakota. This year’s theme is “Education Leading the Way to a Sustainable Tribal Development”...

403

Reduction in Unit Steam Production  

E-Print Network [OSTI]

In 2001 the company's Arch-Brandenburg facility faced increased steam costs due to high natural gas prices and decreased production due to shutdown of a process. The facility was challenged to reduce unit steam consumption to minimize the effects...

Gombos, R.

2004-01-01T23:59:59.000Z

404

Fluorescent lamp unit with magnetic field generating means  

DOE Patents [OSTI]

A fluorescent lamp unit having a magnetic field generating means for improving the performance of the fluorescent lamp is disclosed. In a preferred embodiment the fluorescent lamp comprises four longitudinally extending leg portions disposed in substantially quadrangular columnar array and joined by three generally U-shaped portions disposed in different planes. In another embodiment of the invention the magnetic field generating means comprises a plurality of permanent magnets secured together to form a single columnar structure disposed within a centrally located region defined by the shape of lamp envelope. 4 figs.

Grossman, M.W.; George, W.A.

1989-08-08T23:59:59.000Z

405

Learning under fire: a combat unit in the Southwest Pacific  

E-Print Network [OSTI]

American offensives in the Central Pacific and SWPA. The authors contend that U.S. forces made excellent use of firepower to advance against a tenacious enemy.5 Posing a similar argument, John Ellis? Brute Force asserts that the Japanese collapsed under... in SWPA to its participation in the subsequent occupation of Japan. Built around a core of Texas National Guardsmen, the 112th had a background similar to many of the units that fought in SWPA.13 Federalized in November 1940, the outfit deployed as 5...

Powell, James Scott

2006-10-30T23:59:59.000Z

406

Work For Others (Non-Department of Energy Funded Work)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Work for Others (WFO) is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1A.

2001-09-28T23:59:59.000Z

407

Social Work and Women's Studies Social work engages with individuals,  

E-Print Network [OSTI]

and Women's Studies can lead to careers in child and youth protection services, women's shelters, sexualSocial Work and Women's Studies Social work engages with individuals, families, communities a positive difference in the lives of others. In your fourth year, you will apply what you have learned

408

Work For Others (Non-Department of Energy Funded Work)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Work for Others (WFO) is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. WFO has the following objectives. Cancels DOE O 481.1.

2001-01-03T23:59:59.000Z

409

Coping with Hot Work Environments  

E-Print Network [OSTI]

exposed to these conditions. A hot work environment can impair safety and health. Both workers and their employers are responsi- ble for taking steps to prevent heat stress in the work- place. How Your Body Handles Heat Humans are warm-blooded, which... evaporation. Wiping sweat from the skin with a cloth also prevents cooling from evaporation. In hot, humid conditions, hard work becomes harder. The sweat glands release moisture and essential David W. Smith, Extension Safety Program The Texas A...

Smith, David

2005-04-28T23:59:59.000Z

410

United States-Russia Joint Statement on the Results of the Nuclear...  

Broader source: Energy.gov (indexed) [DOE]

States-Russia Joint Statement on the Results of the Nuclear Energy and Nuclear Security Working Group Meeting United States-Russia Joint Statement on the Results of the Nuclear...

411

Webinar: Using the RTU Comparison Calculator to Justify High-Efficiency Units  

Broader source: Energy.gov [DOE]

The Advanced Rooftop Unit (RTU) Campaign is working with the Pacific Northwest National Laboratory (PNNL) to update its RTU Comparison Calculator (RTUCC). Join this webinar to learn how contractors...

412

Late quaternary geomorphology and geoarchaeology of a segment of the Central Mimbres River Valley, Grant County, New Mexico  

E-Print Network [OSTI]

Two terraces, a modem floodplain, and alluvial fans were identified along a segment of the central Mimbres River Valley in Grant County, New Mexico. The oldest terrace, T2, is composed of one major depositional unit (1) and is capped by a...

Fitch, Michael Anthony

1996-01-01T23:59:59.000Z

413

Transportation External Coordination Working Group:  

Broader source: Energy.gov (indexed) [DOE]

External Coordination Working Group: Background and Process Judith Holm National Transportation Program Albuquerque, New Mexico April 21, 2004 TEC History * DOE's Office of...

414

INL @ work: Nuclear Reactor Operator  

ScienceCinema (OSTI)

INL @ work features jobs at the Idaho National Laboratory. Learn more about careers and energy research at INL's facebook site http://www.facebook.com/idahonationallaboratory

Russell, Patty

2013-05-28T23:59:59.000Z

415

Radiation Safety Work Control Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Radiation Safety Work Control Form (see instructions on pg-3) Rev. May 2014 Area: Form : Date: Preliminary Applicability Screen: (a) Will closing the beam line injection stoppers...

416

Interagency Sustainability Working Group Members  

Broader source: Energy.gov [DOE]

Chaired by the Federal Energy Management Program, the Interagency Sustainability Working Group is composed of representatives from every major Federal agency.

417

INL @ work: Nuclear Reactor Operator  

SciTech Connect (OSTI)

INL @ work features jobs at the Idaho National Laboratory. Learn more about careers and energy research at INL's facebook site http://www.facebook.com/idahonationallaboratory

Russell, Patty

2008-01-01T23:59:59.000Z

418

Infrared Thermography (IRT) Working Group  

Broader source: Energy.gov (indexed) [DOE]

Infrared Thermography (IRT) Working Group Sco McWilliams U.S. Photovoltaic Manufacturing Consor;um (PVMC) Infrared Thermography Infrared Thermography (IRT) has been demonstrated...

419

Construction Work in Progress (Kansas)  

Broader source: Energy.gov [DOE]

This Act allows nuclear power plants to qualify for recovery of Construction Work in Progress (CWIP) and other preconstruction expenditures in rates. Previously, nuclear power plants were excluded...

420

work  

Broader source: Energy.gov (indexed) [DOE]

to 9,500 after the first quarter of this year through a reduction in the support service contract. Fund management followed administrative controls that met the expectations...

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Tri-Lateral Noor al Salaam High Concentration Solar Central Receiver Program  

SciTech Connect (OSTI)

This report documents the efforts conducted primarily under the Noor al Salaam (“Light of Peace”) program under DOE GRANT NUMBER DE-FC36-02GO12030, together with relevant technical results from a closely related technology development effort, the U.S./Israel Science and Technology Foundation (USISTF) High Concentration Solar Central Receiver program. These efforts involved preliminary design, development, and test of selected prototype power production subsystems and documentation of an initial version of the system definition for a high concentration solar hybrid/gas electrical power plant to be built in Zaafarana, Egypt as a first step in planned commercialization. A major part of the planned work was halted in 2007 with an amendment in October 2007 requiring that we complete the technical effort by December 31, 2007 and provide a final report to DOE within the following 90 days. This document summarizes the work conducted. The USISTF program was a 50/50 cost-shared program supported by the Department of Commerce through the U.S./Israel Science and Technology Commission (USISTC). The USISTC was cooperatively developed by President Clinton and the late Prime Minister Rabin of Israel "to encourage technological collaboration" and "support peace in the Middle East through economic development". The program was conducted as a follow-on effort to Israel's Magnet/CONSOLAR Program, which was an advanced development effort to design, fabricate, and test a solar central receiver and secondary optics for a "beam down" central receiver concept. The status of these hardware development programs is reviewed, since they form the basis for the Noor al Salaam program. Descriptions are provided of the integrated system and the major subsystems, including the heliostat, the high temperature air receiver, the power conversion unit, tower and tower reflector, compound parabolic concentrator, and the master control system. One objective of the USISTF program was to conduct marketing research, identify opportunities for use of this technology, and to the extent possible, secure an agreement leading to a pre-commercialization demonstration or prototype plant. This was accomplished with the agreement to conduct the Noor al Salaam program as a tri-lateral project between Egypt, Israel, and the U.S. The tri-lateral project was led by the University of Alabama in Huntsville (UAH); this included the Egyptian New and Renewable Energy Authority and the Israeli USISTC participants. This project, known was Noor al Salaam, was funded by the U.S. Agency for International Development (USAID) through the Department of Energy (DOE). The Egyptian activity was under the auspices of the Egyptian Ministry of Energy and Electricity, New and Renewable Energy Authority (NREA) as part of Egypt's plans for renewable energy development. The objective of the Noor al Salaam project was to develop the conditions necessary to obtain funding and construct and operate an approximately 10 to 20 Megawatt hybrid solar/natural gas demonstration power plant in Zaafarana, Egypt that could serve both as a test bed for advanced solar technology evaluations, and as a forerunner to commercial plant designs. This plant, termed Noor Al Salaam, or “Light of Peace”, reached the initial phase of system definition before being curtailed, in part by changes in USAID objectives, coupled with various delays that were beyond the scope of the program to resolve. The background of the USISTF technology development and pre-commercialization effort is provided in this report, together with documentation of the technology developments conducted under the Noor al Salaam program. It should be noted that only a relatively small part of the Noor al Salaam funding was expended over the approximately five years for which UAH was prime contractor before the program was ordered closed (Reference 1) so that the remaining funds could be returned to USAID.

Blackmon, James B

2008-03-31T23:59:59.000Z

422

Trends in Occupational Fatalities and Industry Growth for Construction Industry in the United States  

E-Print Network [OSTI]

sets. Some countries like Finland, Spain, and Switzerland exclude self-employed workers while Australia, Germany, Italy, and United States including all the workers when counting the deaths. In addition, countries have different coverage periods... for the work related deaths. For example; Australia, Finland, and Switzerland define the deaths if it occurs within one year. Germany and Spain count the work related deaths if it happens within a month, whereat united States, Italy, Norway have...

Dogan, Yildirim

2010-07-14T23:59:59.000Z

423

Offshore Aquaculture in the United States  

E-Print Network [OSTI]

Offshore Aquaculture in the United States: Economic Considerations, Implications & Opportunities). 2008. Offshore Aquaculture in the United States: Economic Considerations, Implications & Opportunities;Offshore Aquaculture in the United States: Economic Considerations, Implications & Opportunities Prepared

424

Saskatchewan Instructional Development and Research Unit (SIDRU)  

E-Print Network [OSTI]

Saskatchewan Instructional Development and Research Unit (SIDRU) 25th ANNUAL REPORT 2009 2010 Saskatchewan Instructional Development & Research Unit Faculty of Education: SIDRU@uregina.ca #12; CONTENTS SASKATCHEWAN INSTRUCTIONAL DEVELOPMENT & RESEARCH UNIT

Argerami, Martin

425

Rice University HOT WORK PERMIT  

E-Print Network [OSTI]

been taken to prevent fire, and permission is authorized for this work. SIGNED (Project Manager of automatic fire detection systems Requirements within 35 ft. (11m.) of work Flammable liquids, dust, lint and oily deposits removed. Explosive atmosphere in area eliminated. Floors swept clean. Combustible

Natelson, Douglas

426

Using the central VAX (Virtual Address Extension) 8700 computer at ANL  

SciTech Connect (OSTI)

This report discusses: the central VAX cluster: what it is and how it works; getting started with the VAX8700 computer and VAX/VMS; training and other available assistance; using the VAX/VMS file system; tape management; printing VMS files; developing programs in VMS; using VMS batch, command procedures, and subprocesses; using available software; and using graphics in VAX/VMS.

Bennington, T.A.; Savage, M.A. (eds.); Lifka, D.A.

1990-05-01T23:59:59.000Z

427

PAR and Supply Distribution System The PAR Program is administered by Materials Logistics (Central Distribution)  

E-Print Network [OSTI]

Logistics (Central Distribution) Services, a division of Materials Management. · The PAR Program is focused Administration: 1. See attached exhibit Models, 1-3 2. See Related Materials Management Forms 3. Weekly action group meeting(s) established to continue the work and ensuring good supply chain/materials management

Oliver, Douglas L.

428

Radiological Work Planning and Procedures  

E-Print Network [OSTI]

Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

Kurtz, J E

2000-01-01T23:59:59.000Z

429

CANADA RUSSIA UNITED KINGDOM UNITED STATES Building / Launching / Operating first ever high definition,  

E-Print Network [OSTI]

1 CANADA · RUSSIA · UNITED KINGDOM · UNITED STATES 1 #12;2 Building / Launching / Operating first

430

Atmospheric chemistry effects of the 1998 Mexican/Central American fires measured in central New Mexico USA.  

SciTech Connect (OSTI)

Atmospheric effects from large fires have received a great deal of interest recently, especially when the fires have the potential to effect human health when the plumes are transported long distances over areas of high population density. Examples are the recent large fires in Southeast Asia in 1997 (1) and the wildfires occurring in southern Mexico and Central America that were manifested in decreased visibility and high aerosol concentrations in the United States at distances of 2500-4000 km from the fires. In addition to fine aerosols, these biomass fires have the potential to produce and transport large quantities of oxygenated organic species such as aldehydes, ketones and carboxylic acids, hydrocarbons, and sulfate and nitrate species. Most of the literature reports dealing with products of biomass burning have been related to fireplace and wood burning stove emissions (2,3) and with local effects from forest fires(4). The recent super-large fires occurring in Indonesia and Mexico/Central America also bring about the issue of atmospheric reactivity because long-range transport affords long reaction times for photochemical reactions, wet and dry deposition and surface reactions on the aerosol particles. The smoke/haze conditions prompted considerable concern among the general population in New Mexico regarding health hazards and a large number of calls to the Albuquerque, NM Air Quality Division which reported the PM{sub 10} samples collected showed no significant increase in mass(5). The conclusion was that the particles were very fine and therefore had considerable influence on the visibility but did not violate health standards. In this study, organic and inorganic chemical species in the gaseous and aerosol phases have been identified and quantified under non-smoky and smoky conditions in Central New Mexico approximately 3000 km from the source of the fires.

Popp, C. J.

1998-12-16T23:59:59.000Z

431

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

7 Air-Conditioning Usage Indicators by Year of Construction, 2005" " Million U.S. Housing Units" ,,"Year of Construction" ,"Housing Units (millions)" ,,"Before 1940","1940 to...

432

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

7 Air-Conditioning Usage Indicators by Number of Household Members, 2005" " Million U.S. Housing Units" ,,"Number of Households With --" ,"Housing Units (millions)" ,,"1 Member","2...

433

-UNIT NAME C-728 Motor Cleaning Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

UNIT NUMBER 33 -UNIT NAME C-728 Motor Cleaning Facility -REGULATORY STATUS--3:.:::.0:..04(--u) -LOCATION North of C-720 (Map...

434

Million U.S. Housing Units Total...............................  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Units (millions) Single-Family Units Apartments in Buildings With-- Home Electronics Usage Indicators Detached Energy Information Administration: 2005 Residential Energy...

435

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

0 Home Appliances Usage Indicators by Year of Construction, 2005" " Million U.S. Housing Units" ,,"Year of Construction" ,"Housing Units (millions)" ,,"Before 1940","1940 to...

436

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

5 Space Heating Usage Indicators by Year of Construction, 2005" " Million U.S. Housing Units" ,,"Year of Construction" ,"Housing Units (millions)" ,,"Before 1940","1940 to...

437

Central Energy Systems - Applications to Economic Development  

E-Print Network [OSTI]

the conceptual stage of design. The second program, Central Energy Systems Analysis Program (CESAP) analyzes energy efficiency for a group of buildings and determines if a new district heating and cooling (DHC) system would be a cost effective application...

Myers, M. S.; Diserens, S. E.

1985-01-01T23:59:59.000Z

438

Central Station DHC Phase 1 feasibility  

SciTech Connect (OSTI)

This project assisted a private real estate developer in technically assessing the feasibility of integrating a central DHC system into a proposed 72 acre area mixed-use Planned Development (Central Station) just south of the Chicago Central Business District (Loop). The technical assessment concluded that a district heating and cooling system for Central Station will be feasible, provided that a major anchor load can be connected to the system. The system conceived for the site employs a modular approach that adjusts production capacity to actual load growth. The design concept includes gas-fired boilers for heating, gas turbine driven chillers for base loading, electric motor driven chillers for peaking, steam turbines for peak power and back pressure operation, and chilled water storage. Energy will be supplied to the users in the form of steam or low temperature hot water for heating, and low temperature chilled water for cooling.

Henderson, H.L.

1992-03-01T23:59:59.000Z

439

Central Georgia EMC- Photovoltaic Rebate Program  

Broader source: Energy.gov [DOE]

In June 2008, Central Georgia Electric Membership Corporation (CGEMC) began offering a rebate of $450 per kilowatt (kW) to residential members who install photovoltaic (PV) systems that are...

440

Solidere : the battle for Beirut's Central District  

E-Print Network [OSTI]

The Beirut Central District was destroyed during the Lebanese Civil War which extended from 1975 to 1990. Unable to reconstruct the center itself, the Lebanese government turned to a private Real Estate Holding Company ...

Mango, Tamam, 1981-

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

OXY (Occidental Petroleum Corp. ) units plan U. K. work worth $1. 5 billion  

SciTech Connect (OSTI)

Occidental Refineries Ltd., an Occidental Petroleum Corp. subsidiary, plans to spend about $500,000 to build a 60,000 bbl/day hydrocracker on Canvey Island near London to produce aviation fuel, naphtha, and gasoline. Occidental hopes to deflect criticism by environmentalists, concerned about the concentration of petroleum facilities in the area, by installing a minimum amount of LPG storage and not using hydrogen sulfide on the site. During the 1970's, Occidental had prepared the site for the construction of a 125,000 bbl/day refinery, plans for which were scrapped after the demand for product compounds decreased. Occidental Chemical Co., another Occidental Petroleum subsidiary, plans to spend about $500,000 to build a 300,000 ton/yr ethylene plant at Peterhead, Scotl. The cracker would take part of the output from the de-ethanizer at the St. Fergus terminal for the proposed U.K. gas-gathering pipeline. Both projects would require about 3-4 yr to complete. Esso Chemical Ltd. will build a 550,000 ton/yr ethylene plant near the Mossmoran gas liquids plant in Fife, Scotl.

Not Available

1980-09-15T23:59:59.000Z

442

Making european-style community wind power development work in the United States  

E-Print Network [OSTI]

Wisconsin Community Based Windpower Project Business Plan.site, www.masstech.org/windpower/index.htm [12] __________.Wisconsin Community Based Windpower Project Business Plan”

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

443

United States-Japan Nuclear Security Working Group Fact Sheet | National  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption by sectorlong version)Underground NaturalUnions, 325.6

444

Geology And A Working Conceptual Model Of The Obsidian Butte (Unit 6)  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation, searchGeauga County, Ohio: EnergySector:2008)the Raft River

445

United States and UAE Work Together on Energy and Water Nexus | Department  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' Research Petroleum ReserveDepartment ofEnergy, Office ofNuclear DamageDepartmentof

446

Work for Others (Non-Department of Energy Funded Work)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Work for Others is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1B. Certified 1-13-11. Admin Chg 1, dated 3-14-11, cancels DOE O 481.1C.

2005-01-24T23:59:59.000Z

447

Work for Others (Non-Department of Energy Funded Work)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Work for Others is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1B. Certified 1-13-11. Admin Chg 1, dated 3-14-11.

2005-01-24T23:59:59.000Z

448

A handbook for solar central receiver design  

SciTech Connect (OSTI)

This Handbook describes central receiver technology for solar thermal power plants. It contains a description and assessment of the major components in a central receiver system configured for utility scale production of electricity using Rankine-cycle steam turbines. It also describes procedures to size and optimize a plant and discussed examples from recent system analyses. Information concerning site selection criteria, cost estimation, construction, and operation and maintenance is also included, which should enable readers to perform design analyses for specific applications.

Falcone, P.K.

1986-12-01T23:59:59.000Z

449

National Central University Department of Optics and Photonics  

E-Print Network [OSTI]

National Central University Department of Optics and Photonics Rapid Constructions of Circular of Optics and Photonics, National Central University, Taiwan. 2. Institute of Nuclear Energy Research, Taiwan. #12;National Central University Department of Optics and Photonics 2 Outline · Interpolation

Arizona, University of

450

Methods for measuring work surface illuminance in adaptive solid state lighting networks  

E-Print Network [OSTI]

Methods for measuring work surface illuminance in adaptive solid state lighting networks Byungkun, MA 02139, USA ABSTRACT The inherent control flexibility implied by solid-state lighting ­ united propose several techniques for measuring work surface illuminance and ambient light using a sensor network

451

FY 1994 Annual Work Plan  

SciTech Connect (OSTI)

In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

Not Available

1993-09-30T23:59:59.000Z

452

Recovery Act Funds at Work  

Broader source: Energy.gov [DOE]

Funds from the American Recovery and Reinvestment Act of 2009 (Recovery Act) are being put to work to improve safety, reliability, and service in systems across the country. Here are case studies from a variety of Recovery Act programs.

453

Utility Security & Resiliency: Working Together  

Broader source: Energy.gov [DOE]

Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—discusses Edison Electric Institute (EEI), including its key security objectives, key activities, cybersecurity activities, and spare transformer equipment program (STEP).

454

Categorical Exclusion for Maintenance Work  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Work along the Electrical District 5 to Saguaro segment (414 to 585) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal...

455

Appendix A - Statement of Work  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ATTACHMENT 1 to NREL RFP No. RXL-4-42172 APPENDIX A STATEMENT OF WORK "U.S. Department of Energy Solar Decathlon 2015 Construction Cost Estimates" 071614 1.0 BACKGROUND The U.S....

456

CSREES Nutrient Management Working Meeting  

E-Print Network [OSTI]

planning process ­ Nutrient management training ­ P-Indexes and tools developed ­ Educational materials #12Welcome CSREES Nutrient Management Working Meeting May 4 and 5, 2004 Atlanta, GA #12;University Objectives · Information Sharing Among States ­ Nutrient management regulations ­ Nutrient management

457

North Central Texas Alternative Fuel and Advanced Technology...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

North Central Texas Alternative Fuel and Advanced Technology Investments North Central Texas Alternative Fuel and Advanced Technology Investments 2011 DOE Hydrogen and Fuel Cells...

458

Modeling-Computer Simulations At Central Nevada Seismic Zone...  

Open Energy Info (EERE)

Modeling-Computer Simulations At Central Nevada Seismic Zone Region (Biasi, Et Al., 2009) Exploration Activity Details Location Central Nevada Seismic Zone Geothermal Region...

459

Geodetic Survey At Central Nevada Seismic Zone Region (Blewitt...  

Open Energy Info (EERE)

ENERGYGeothermal Home Exploration Activity: Geodetic Survey At Central Nevada Seismic Zone Region (Blewitt Et Al, 2005) Exploration Activity Details Location Central...

460

Compound and Elemental Analysis At Central Nevada Seismic Zone...  

Open Energy Info (EERE)

Central Nevada Seismic Zone Region (Laney, 2005) Exploration Activity Details Location Central Nevada Seismic Zone Geothermal Region Exploration Technique Compound and Elemental...

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Refraction Survey At Central Nevada Seismic Zone Region (Heimgartner...  

Open Energy Info (EERE)

Central Nevada Seismic Zone Region (Heimgartner, Et Al., 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Refraction Survey At Central...

462

North Central Texas Alternative Fuel and Advanced Technology...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

D.C. tiarravt057reese2010p.pdf More Documents & Publications North Central Texas Alternative Fuel and Advanced Technology Investments North Central Texas Alternative Fuel and...

463

North Central Texas Alternative Fuel and Advanced Technology...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

North Central Texas Alternative Fuel and Advanced Technology Investments North Central Texas Alternative Fuel and Advanced Technology Investments 2012 DOE Hydrogen and Fuel Cells...

464

Application of Graphics Processing Units to Search Pipeline for Gravitational Waves from Coalescing Binaries of Compact Objects  

E-Print Network [OSTI]

We report a novel application of graphics processing units (GPUs) for the purpose of accelerating the search pipelines for gravitational waves from coalescing binaries of compact objects. A speed-up of 16 fold has been achieved compared with a single central processing unit (CPU). We show that substantial improvements are possible and discuss the reduction in CPU count required for the detection of inspiral sources afforded by the use of GPUs.

Shin Kee Chung; Linqing Wen; David Blair; Kipp Cannon; Amitava Datta

2010-05-17T23:59:59.000Z

465

SUNY Programs: The United Kingdom  

E-Print Network [OSTI]

SUNY Programs: The United Kingdom & Ireland Semester, Academic Year and Short Term #12;1 Table of Contents How to Use This Booklet 1 Choosing a Program in the UK and Ireland 2 Exchange versus Study Abroad 3 Semester & Academic Year Programs 4 Programs in London 4 Programs outside of London 7 Programs

Suzuki, Masatsugu

466

UNITED STATES NUCLEAR REGULATORY COMMISSION  

E-Print Network [OSTI]

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS ON RADIATION THERAPY OVEREXPOSURES IN PANAMA Addressees All medical licensees. Purpose The U.S. Nuclear times resulted in significant radiation overexposures to patients. The hospital staff did not perform

467

University Assessment Contacts Academic Units  

E-Print Network [OSTI]

.j.arp@oregonstate.edu 541-737-2331 Notes: Agricultural and Resource Economics Assessment Rep: Email: Phone: Penelope DiebelUniversity Assessment Contacts Academic Units COLLEGE OF AGRICULTURAL SCIENCES Assessment Rep.Capalbo@oregonstate.edu 541-737-5639 Notes: Agricultural Education and Agricultural Sciences Assessment Rep: Email: Phone

Escher, Christine

468

United Nations on Trade and  

E-Print Network [OSTI]

by the World Summit on Sustainable Development in September 2002, the United Nations Forum on Forests on the Management, Conservation and Sustainable Development of All Types of Forests, and the relevant Chapters on the Management, Conservation and Sustainable Development of All Types of Forests; (e) Recognizing the importance

469

ABPDU - Advanced Biofuels Process Demonstration Unit  

SciTech Connect (OSTI)

Lawrence Berkeley National Lab opened its Advanced Biofuels Process Demonstration Unit on Aug. 18, 2011.

None

2011-01-01T23:59:59.000Z

470

FISHERY STATISTICS OF THE UNITED STATES  

E-Print Network [OSTI]

FISHERY STATISTICS OF THE UNITED STATES 1946 BY A. W. ANDERSON and E. A. POWER UNITED STATES GOVERNMENT Statistics of the United States, 1946 #12;FISHERY STATISTICS OF THE UNITED STATES: 1946 By A. W. ANDERSON City 129 Section 4. - Chesapeake Fisheries 131 Sectional Summaries 133 Mary I and 137 Vi rginia 140

471

Organization of ISI by Divisions and Constituent Units Information Sciences Division  

E-Print Network [OSTI]

Biological Sciences Division Agricultural and Ecological Research Unit Human Genetics Unit Biological Unit Canteen Security Unit Medical Welfare Unit Telephone Unit Transport Unit Guest House Audio Visual

Bandyopadhyay, Antar

472

Remedial action work plan for the Colonie site. Revision 1  

SciTech Connect (OSTI)

The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab.

Not Available

1985-08-01T23:59:59.000Z

473

Target Value Design: Applications to Newborn Intensive Care Units  

E-Print Network [OSTI]

teams are considering the transition from open-bay NICUs to single-family-room (SFR) units. This paper introduces the guiding principles behind target value design (TVD)—a price-led design methodology that is gaining acceptance in healthcare facility... pioneers. A working knowledge of the TVD framework is important for integrating long-term value into a NICU facility. Lean Construction and the Emergence of Target Value Design Success principles that originated from the Toyota Production System, later...

Rybkowski, Zofia K.; Shepley, Mardelle McCuskey; Ballard, H. Glenn

2015-02-08T23:59:59.000Z

474

Radiological Work Planning and Procedure  

SciTech Connect (OSTI)

Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In addition, there seems to be confusion as to what should be and what should not be included in the TWD.

KURTZ, J.E.

2000-01-01T23:59:59.000Z

475

CFCC working group meeting: Proceedings  

SciTech Connect (OSTI)

This report is a compilation of the vugraphs presented at this meeting. Presentations covered are: CFCC Working Group; Overview of study on applications for advanced ceramics in industries for the future; Design codes and data bases: The CFCC program and its involvement in ASTM, ISO, ASME, and military handbook 17 activities; CFCC Working Group meeting (McDermott Technology); CFCC Working Group meeting (Textron); CFCC program for DMO materials; Developments in PIP-derived CFCCs; Toughened Silcomp (SiC-Si) composites for gas turbine engine applications; CFCC program for CVI materials; Self-lubricating CFCCs for diesel engine applications; Overview of the CFCC program`s supporting technologies task; Life prediction methodologies for CFCC components; Environmental testing of CFCCs in combustion gas environments; High-temperature particle filtration ORNL/DCC CRADA; HSCT CMC combustor; and Case study -- CFCC shroud for industrial gas turbines.

NONE

1997-12-31T23:59:59.000Z

476

Geochronologic and Thermobarometric Constraints on the Evolution of the Main Central Thrust, central Nepal Himalaya  

E-Print Network [OSTI]

, central Nepal Himalaya E.J. Catlos1 , T. Mark Harrison1 , Matthew J. Kohn2 , Marty Grove1 , F.J. Ryerson3. 4. Department of Geology, Tri-Chandra Campus, Tribhuvan University, Kathmandu, Nepal. Journal sampled along the Marysandi River and Darondi Khola in the Annapurna region of central Nepal show striking

Harrison, Mark

477

Centralized Authorization Using a Direct Service, Part II  

SciTech Connect (OSTI)

Authorization is the process of deciding if entity X is allowed to have access to resource Y. Determining the identity of X is the job of the authentication process. One task of authorization in computer networks is to define and determine which user has access to which computers in the network. On Linux, the tendency exists to create a local account for each single user who should be allowed to logon to a computer. This is typically the case because a user not only needs login privileges to a computer but also additional resources like a home directory to actually do some work. Creating a local account on every computer takes care of all this. The problem with this approach is that these local accounts can be inconsistent with each other. The same user name could have a different user ID and/or group ID on different computers. Even more problematic is when two different accounts share the same user ID and group ID on different computers: User joe on computer1 could have user ID 1234 and group ID 56 and user jane on computer2 could have the same user ID 1234 and group ID 56. This is a big security risk in case shared resources like NFS are used. These two different accounts are the same for an NFS server so that these users can wipe out each other's files. The solution to this inconsistency problem is to have only one central, authoritative data source for this kind of information and a means of providing all your computers with access to this central source. This is what a ''Directory Service'' is. The two directory services most widely used for centralizing authorization data are the Network Information Service (NIS, formerly known as Yellow Pages or YP) and Lightweight Directory Access Protocol (LDAP).

Wachsmann, A

2004-06-09T23:59:59.000Z

478

Long working distance interference microscope  

DOE Patents [OSTI]

Disclosed is a long working distance interference microscope suitable for three-dimensional imaging and metrology of MEMS devices and test structures on a standard microelectronics probe station. The long working distance of 10-30 mm allows standard probes or probe cards to be used. This enables nanometer-scale 3-D height profiles of MEMS test structures to be acquired across an entire wafer. A well-matched pair of reference/sample objectives is not required, significantly reducing the cost of this microscope, as compared to a Linnik microinterferometer.

Sinclair, Michael B.; DeBoer, Maarten P.; Smith, Norman F.

2004-04-13T23:59:59.000Z

479

Central Plateau Inner Area Cleanup Principles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and User ExecutiveCentral Activator Keeps theCentral

480

South Central Power Company | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd JumpGTZ Partner Central Energy FundInformationSouth Central Power

Note: This page contains sample records for the topic "working unit central" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

CARBON DEFLAGRATION IN TYPE Ia SUPERNOVA. I. CENTRALLY IGNITED MODELS  

SciTech Connect (OSTI)

A leading model for Type Ia supernovae (SNe Ia) begins with a white dwarf near the Chandrasekhar mass that ignites a degenerate thermonuclear runaway close to its center and explodes. In a series of papers, we shall explore the consequences of ignition at several locations within such dwarfs. Here we assume central ignition, which has been explored before, but is worth revisiting, if only to validate those previous studies and to further elucidate the relevant physics for future work. A perturbed sphere of hot iron ash with a radius of {approx}100 km is initialized at the middle of the star. The subsequent explosion is followed in several simulations using a thickened flame model in which the flame speed is either fixed-within the range expected from turbulent combustion-or based on the local turbulent intensity. Global results, including the explosion energy and bulk nucleosynthesis (e.g., {sup 56}Ni of 0.48-0.56 M{sub Sun }) turn out to be insensitive to this speed. In all completed runs, the energy released by the nuclear burning is adequate to unbind the star, but not enough to give the energy and brightness of typical SNe Ia. As found previously, the chemical stratification observed in typical events is not reproduced. These models produce a large amount of unburned carbon and oxygen in central low velocity regions, which is inconsistent with spectroscopic observations, and the intermediate mass elements and iron group elements are strongly mixed during the explosion.

Ma, H.; Woosley, S. E.; Malone, C. M. [Department of Astronomy and Astrophysics, University of California, Santa Cruz, CA 95064 (United States); Almgren, A.; Bell, J. [Center for Computational Sciences and Engineering, Lawrence Berkeley National Lab, Berkeley, CA 94720 (United States)

2013-07-01T23:59:59.000Z

482

Qualification of the Joints for the ITER Central Solenoid  

SciTech Connect (OSTI)

The ITER Central Solenoid has 36 interpancake joints, 12 bus joints, and 12 feeder joints in the magnet. The joints are required to have resistance below 4 nOhm at 45 kA at 4.5 K. The US ITER Project Office developed two different types of interpancake joints with some variations in details in order to find a better design, qualify the joints, and establish a fabrication process. We built and tested four samples of the sintered joints and two samples with butt-bonded joints (a total of eight joints). Both designs met the specifications. Results of the joint development, test results, and selection of the baseline design are presented and discussed in the paper. The ITER Central Solenoid (CS) consists of six modules. Each module is composed of six wound hexapancakes and one quadrapancake. The multipancakes are connected electrically and hydraulically by in-line interpancake joints. The joints are located at the outside diameter (OD) of the module. Cable in conduit conductor (CICC) high-current joints are critical elements in the CICC magnets. In addition to low resistivity, the CS joints must fit a space envelope equivalent to the regular conductor cross section and must have low hydraulic impedance and enough structural strength to withstand the hoop and compressive forces during operation, including cycling. This paper is the continuation of the work reported on the intermodule joints.

Martovetsky, N; Berryhill, A; Kenney, S

2011-09-01T23:59:59.000Z

483

Arbeidslivets lover Act relating to working environment,  

E-Print Network [OSTI]

Arbeidslivets lover Act relating to working environment, working hours and employment protection, etc. (Working Environment Act). as subsequently amended, last by the Act of 14. December 2012 No. 80.notification................................................................... 6 Chapter 3. Working environment measures..................................... 6 Section.3

Johansen, Tom Henning

484

Update: Effective Load-Carrying Capability of Photovoltaics in the United States; Preprint  

SciTech Connect (OSTI)

This paper provides an update on the U.S. distribution of effective load-carrying capability (ELLC) for photovoltaics by analyzing recent load data from 39 U.S. utilities and time-coincident output of PV installations simulated from high-resolution, time/site-specific satellite data. Results show that overall regional trends identified in the early 1990s remain pertinent today, while noting a significant increase in PV ELCC in the western and northern United States, and a modest decrease in the central and eastern United States.

Perez, R.; Margolis, R.; Kmiecik, M.; Schwab, M.; Perez, M.

2006-06-01T23:59:59.000Z

485

Federal Utility Partnership Working Group  

Broader source: Energy.gov [DOE]

The Federal Utility Partnership Working Group (FUPWG) establishes partnerships and facilitates communications among Federal agencies, utilities, and energy service companies. The group develops strategies to implement cost-effective energy efficiency and water conservation projects through utility incentive programs at Federal sites.

486

working with industry Engineering and  

E-Print Network [OSTI]

of interests including: · laser physics · semiconductor optoelectronics · photonics in manufacturing · solar · micromechanics and condition monitoring · renewable energy modelling · carbon capture and storage Our institute to applied systems. We have a wide ranging programme of current work with many industrial companies in key

Painter, Kevin

487

Indico Central - Events Organisation, Ergonomics and Collaboration Tools Integration  

E-Print Network [OSTI]

While the remote collaboration services at CERN slowly aggregate around the Indico event management software, its new version which is the result of a careful maturation process includes improvements which will set a new reference in its domain. The presentation will focus on the description of the new features of the tool, the user feedback process which resulted in a new record of usability. We will also describe the interactions with the worldwide community of users and server administrators and the impact this has had on our development process, as well as the tools set in place to streamline the work between the different collaborating sites. A last part will be dedicated to the use of Indico as a central hub for operating other local services around the event organisation (registration epayment, audiovisual recording, webcast, room booking, and videoconference support)

Gonzalez Lopez, J B; Baron, T; CERN. Geneva. IT Department; 10.1088/1742-6596/219/8/082002

2010-01-01T23:59:59.000Z

488

United States Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Ms. Marschman's experience, she was "slower than the other RCTs." Tr. at 239. Marcus Kelly, a coworker of Ms. Marschman's at CFA who also worked at MFC for 20 years, testified...

489

Report on all ARRA Funded Technical Work  

SciTech Connect (OSTI)

The main focus of this American Recovery and Reinvestment Act of 2009 (ARRA) funded project was to design an energy efficient carbon capture and storage (CCS) process using the Recipient?s membrane system for H{sub 2} separation and CO{sub 2} capture. In the ARRA-funded project, the Recipient accelerated development and scale-up of ongoing hydrogen membrane technology research and development (R&D). Specifically, this project focused on accelerating the current R&D work scope of the base program-funded project, involving lab scale tests, detail design of a 250 lb/day H{sub 2} process development unit (PDU), and scale-up of membrane tube and coating manufacturing. This project scope included the site selection and a Front End Engineering Design (FEED) study of a nominally 4 to 10 ton-per-day (TPD) Pre-Commercial Module (PCM) hydrogen separation membrane system. Process models and techno-economic analysis were updated to include studies on integration of this technology into an Integrated Gasification Combined Cycle (IGCC) power generation system with CCS.

None

2013-10-05T23:59:59.000Z

490

Systems of Units Systems of units fall into three general categories (see Table 1. below)  

E-Print Network [OSTI]

in astrophysics and in particle dynamics. It is less convenient on earth, where we keep having to calculate static in English units. In industrial metric units, we still ...nd kgf /cm2 , sometimes UNITS Force Mass Accel. gc

491

Covered Product Category: Residential Central Air Conditioners  

Broader source: Energy.gov [DOE]

FEMP provides acquisition guidance across a variety of product categories, including residential central air conditioners (CACs), which are an ENERGY STAR®-qualified product category. Federal laws and requirements mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law.

492

500-kV Central Ferry Substation ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Substation Y Y Central Ferry Substation T u c a n n o n R i v e r S n a k e R i v e r 12 U V 127 U V 127 U V 260 U V 261 12 Starbuck Starbuck W h i t m a n W h i t m a...

493

Cloud Computing: Centralization and Data Sovereignty  

E-Print Network [OSTI]

1 Cloud Computing: Centralization and Data Sovereignty Primavera De Filippi, Smari McCarthy Abstract: Cloud computing can be defined as the provision of computing resources on-demand over and elasticity of costs, problems arise concerning the collection of personal information in the Cloud

Paris-Sud XI, Université de

494

Universidad Central de Venezuela Facultad de Ciencias  

E-Print Network [OSTI]

Universidad Central de Venezuela Facultad de Ciencias Escuela de Computación Lecturas en Ciencias) for some E Cn�n with E Venezuela Venezuela, Centro de C´alculo Cient´ifico y Tecnol´ogico, (zenaida.castillo@ciens.ucv.ve). 1 #12;2 R

Astudillo, Reinaldo

495

Mechanical Working Group meeting minutes  

SciTech Connect (OSTI)

This documents contains the minutes and viewgraphs from the October 27--28, 1992 meeting on the subject of power generation and delivery systems for military applications. Attendees represented the US Air Force and NASA. The thermal management panel reported on the capillary pump loop test facility, thermal control systems and compressors, and the oxygen heat pipe flight experiment. The aerospace power panel reported on the integrated power unit for the more electric airplane, the solar dynamic power system, the modular high temperature gas cooled reactor-gas-turbine program, the multi-megawatt CBC power system, and analytical modeling for heat pipe performance. The terrestrial power panel reported on a free piston stirling engine power generation system, fuel cell vehicles, and the advanced gas turbine project.

Not Available

1992-12-01T23:59:59.000Z

496

The Sentara Mobile Mammography Unit | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Sentara Mobile Mammography Unit The Sentara Mobile Mammography Unit will be here at Jefferson Lab on December 11, 2014 from 9 a.m.-2 p.m. Mammography detects breast cancer and...

497

Meteorological database for the United States  

E-Print Network [OSTI]

to Indoor Air Meteorological Database for the United StatesUC-402 Meteorological Database for the United States M.G.Abstract A meteorological database has been developed to aid

Apte, M.G.

2011-01-01T23:59:59.000Z

498

July 2012, Work Force Retention Work Group Status Overview  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7January 2015JimJulie Crenshaw Van10TrainingWork

499

Work Force Retention Work Group Charter | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of EnergyofProject isNovember 07, 2007WhatJennifer B.RobinTerriYahelWork Force

500

Intra- and inter-unit variation in fly ash petrography: Examples from a western Kentucky power station  

SciTech Connect (OSTI)

Fly ash was collected from eight mechanical and ten baghouse hoppers at each of twin 150-MW wall-fired units in a western Kentucky power station. The fuel burned at that time was a blend of low-sulfur, high volatile bituminous Central Appalachian coals. The baghouse ash showed less variation between units than the mechanical units. The coarser mechanical fly ash showed significant differences in the amount of total carbon and in the ratio of isotropic coke to both total carbons and total coke; the latter excluding inertinite and other unburned, uncoked coal. There was no significant variation in ratios of inorganic fly ash constituents. The inter-unit differences in the amount and forms of mechanical fly ash carbon appear to be related to differences in pulverizer efficiency, leading to greater amounts of coarse coal, therefore unburned carbon, in one of the units.

Hower, J.C.; Rathbone, R.F. [Univ. of Kentucky, Lexington, KY (United States). Center for Applied Energy Research; Goodman, J. [Prestonburg High School, KY (United States)

1998-12-31T23:59:59.000Z