National Library of Energy BETA

Sample records for working freezer section

  1. Magnetocaloric Refrigerator Freezer

    Office of Environmental Management (EM)

    Magnetocaloric Refrigerator Freezer 2014 Building Technologies Office Peer Review CRADA PARTNER General Electric P.I: Ayyoub M. Momen, momena@ornl.gov R&D Staff, Oak Ridge National Laboratory Project Summary Timeline: Start date: Aug 1 st , 2013 (FY14) Planned end date: Sept 30 th , 2016 Key Milestones 1. Determine requirements for refrigeration circuit seals and hydraulics; 31-March-2014 2. Develop breadboard refrigerator-freezer design; Achieve target goals with breadboard design;

  2. Section C: Description, Specifications and Work Statements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    C DESCRIPTION/SPECIFICATION/ STATEMENT OF WORK Request for Proposal #DE-RP36-07GO97036 PART I SECTION C DESCRIPTION/SPECIFICATION/ STATEMENT OF WORK TABLE OF CONTENTS C.1 Introduction ............................................................................................................1 C.2 Purpose ...................................................................................................................2 C.3

  3. ISSUANCE 2015-07-31: Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Intent to Establish a Working Group for Certain Equipment Classes of Refrigeration Systems of Walk-in Coolers and Freezers to Negotiate a Notice of Proposed Rule

    Broader source: Energy.gov [DOE]

    Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Intent to Establish a Working Group for Certain Equipment Classes of Refrigeration Systems of Walk-in Coolers and Freezers to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards

  4. Covered Product Category: Commercial Refrigerators and Freezers |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Refrigerators and Freezers Covered Product Category: Commercial Refrigerators and Freezers The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial refrigerators and freezers, which are covered by the ENERGY STAR program. Federal laws and requirements mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law. Meeting Efficiency Requirements for Commercial

  5. Covered Product Category: Commercial Refrigerators and Freezers

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial refrigerators and freezers, which are covered by the ENERGY STAR program.

  6. Demonstration Assessment of Light-Emitting Diode (LED) Freezer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demonstration Assessment of Light-Emitting Diode (LED) Freezer Case Lighting Demonstration Assessment of Light-Emitting Diode (LED) Freezer Case Lighting This document is a report ...

  7. TEC Working Group Topic Groups Section 180(c) Key Documents ...

    Office of Environmental Management (EM)

    Key Documents TEC Working Group Topic Groups Section 180(c) Key Documents Key Documents Briefing Package for Section 180(c) Implementation - July 2005 PDF icon Executive Summary...

  8. Section 180(c) Ad Hoc Working Group | Department of Energy

    Office of Environmental Management (EM)

    180(c) Ad Hoc Working Group Section 180(c) Ad Hoc Working Group PDF icon Section 180(c) Ad Hoc Working Group More Documents & Publications Nuclear Fuel Storage and Transportation Planning Project Overview DOE Office of Nuclear Energy Transportation Plan Ad Hoc Working Group

  9. Part III: Section C - Description, Specification, Statement of Work

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECTION C DESCRIPTION/SPECIFICATION/ STATEMENT OF WORK DE-AC36-08GO28308 Modification M901 Section C - Page ii PART I SECTION C DESCRIPTION/SPECIFICATION/ STATEMENT OF WORK TABLE OF CONTENTS C.1 Introduction ............................................................................................................ 1 C.2 Purpose ................................................................................................................... 2 C.3 Background

  10. TEC Working Group Topic Groups Section 180(c) Meeting Summaries...

    Office of Environmental Management (EM)

    Meeting Summaries TEC Working Group Topic Groups Section 180(c) Meeting Summaries Meeting Summaries PDF icon Washington, DC TEC Meeting - 180(c) Group Summary - March 15, 2006 More...

  11. 2014-04-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule regarding test procedures for residential refrigerators and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014.

  12. Quality Work Plan Checklist and Resources - Section 1

    Energy Savers [EERE]

    Quality Work Plan Checklist and Resources - Section 1 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. App Section 15-4 Section Question Yes No Resources V.5.1 1 Are you on track to submit current field guides and standards, including any necessary variance

  13. Quality Work Plan Checklist and Resources - Section 2

    Energy Savers [EERE]

    Quality Work Plan Checklist and Resources - Section 2 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. App Section 15-4 Section Checklist Item Yes No V.5.1 2 Have you included language in Subgrantee contracts that clearly documents the SWS specifications and

  14. Quality Work Plan Checklist and Resources - Section 4

    Energy Savers [EERE]

    Quality Work Plan Checklist and Resources - Section 4 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. The last question applies only to Hawaii and the Territories, and the previous 4 questions do not apply to Hawaii and the Territories. App Section 15-4 Section

  15. Demonstration Assessment of LED Freezer Case Lighting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demonstration Assessment of Light-Emitting Diode (LED) Freezer Case Lighting Host Site: Albertsons Grocery, Eugene, Oregon Final Report prepared in support of the U.S. DOE Solid State Lighting Technology Demonstration GATEWAY Program Study Participants: Pacific Northwest National Laboratory U.S. Department of Energy LED Power, Inc. Aztec Energy Partners PECI, Inc. Eugene Water and Electric Board October 2009 Prepared for the U.S. Department of Energy by Pacific Northwest National Laboratory

  16. DOE Reaches Settlement with Freezer Manufacturer | Department of Energy

    Energy Savers [EERE]

    Settlement with Freezer Manufacturer DOE Reaches Settlement with Freezer Manufacturer May 29, 2015 - 9:20am Addthis The General Counsel's enforcement office settled an enforcement action against Perlick Corporation for $168,200. Perlick agreed to the settlement after manufacturing and distributing 841 units of freezer model HP24F. DOE found that the model consumed over 20% more energy than permitted under the applicable energy conservation standard. Documents related to the distribution of

  17. 6 Energy Saving Tips for Commercial Refrigerators and Freezers | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 6 Energy Saving Tips for Commercial Refrigerators and Freezers 6 Energy Saving Tips for Commercial Refrigerators and Freezers February 28, 2014 - 6:11pm Addthis Dale Linkous carries pizza out of the walk-in freezer in the kitchen at the National Renewable Energy Laboratory in Golden, Colorado. The Energy Department <a href="http://energy.gov/articles/new-energy-efficiency-standards-commercial-refrigeration-equipment-cut-businesses-energy">announced new energy

  18. Covered Product Category: Residential Freezers | Department of Energy

    Office of Environmental Management (EM)

    Freezers Covered Product Category: Residential Freezers The Federal Energy Management Program (FEMP) provides acquisition guidance for residential freezers, a product category covered by the ENERGY STAR program. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products in all product categories covered by this program and any acquisition actions that are not specifically exempted by law. MEETING EFFICIENCY REQUIREMENTS FOR FEDERAL PURCHASES The U.S.

  19. VEH-0015 - In the Matter of Sub-Zero Freezer Co. | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VEH-0015 - In the Matter of Sub-Zero Freezer Co. VEH-0015 - In the Matter of Sub-Zero Freezer Co. Motion for Evidentiary Hearing Sub-Zero Freezer Co. (Sub-Zero) filed a motion for...

  20. Overview of recent U235 neutron cross section evaluation work

    SciTech Connect (OSTI)

    Lubitz, C. [Lockheed Martin Corp., Schenectady, NY (United States)

    1998-10-01

    This report is an overview (through 1997) of the U235 neutron cross section evaluation work at Oak Ridge National Laboratory (ORNL), AEA Technology (Harwell) and Lockheed Martin Corp.-Schenectady (LMS), which has influenced, or appeared in, ENDF/B-VI through Release 5. The discussion is restricted to the thermal and resolved resonance regions, apart from some questions about the unresolved region which still need investigation. The important role which benchmark testing has played will be touched on.

  1. DOE Resolves Avanti Refrigerator and Freezer Civil Penalty Case

    Broader source: Energy.gov [DOE]

    Today, the Department of Energy announced that it has resolved the civil penalty action against Mackle Company for its failure to certify that refrigerators and refrigerator-freezers sold under the...

  2. Demonstration Assessment of Light-Emitting Diode (LED) Freezer Case

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lighting | Department of Energy Demonstration Assessment of Light-Emitting Diode (LED) Freezer Case Lighting Demonstration Assessment of Light-Emitting Diode (LED) Freezer Case Lighting This document is a report of observations and results obtained from a lighting demonstration project conducted under a U.S. Department of Energy program. The program supports demonstrations of high-performance solid-state lighting (SSL) products in order to develop empirical data and experience with

  3. Refrigerator-Freezers (multiple defrost waiver) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Refrigerator-Freezers (multiple defrost waiver) Refrigerator-Freezers (multiple defrost waiver) The Department of Energy (DOE) develops standardized data templates for reporting the results of tests conducted in accordance with current DOE test procedures. Templates may be used by third-party laboratories under contract with DOE that conduct testing in support of ENERGY STAR® verification, DOE rulemakings, and enforcement of the federal energy conservation standards. File Residential

  4. Residential Refrigerators-Freezers (Appendix A1) | Department of Energy

    Energy Savers [EERE]

    Refrigerators-Freezers (Appendix A1) Residential Refrigerators-Freezers (Appendix A1) The Department of Energy (DOE) develops standardized data templates for reporting the results of tests conducted in accordance with current DOE test procedures. Templates may be used by third-party laboratories under contract with DOE that conduct testing in support of ENERGY STAR® verification, DOE rulemakings, and enforcement of the federal energy conservation standards. File Residential

  5. 2014-07-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule Correction

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for refrigerators, refrigerator-freezers, and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on July 10, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  6. Purchasing Energy-Efficient Commercial Refrigerators and Freezers

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial refrigerators and freezers, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  7. FMT Workforce FTEs by Scope Current Contract Scope of Work (Section...

    National Nuclear Security Administration (NNSA)

    FMT Workforce FTEs by Scope Current Contract Scope of Work (Section J. Appendix A) FTE's* Directed Stockpile Work (DSW) 1,329 Campaigns 260 Readiness in Technical Base & Facilities...

  8. Elmira Stove Works: Proposed Penalty (2011-CE-1407)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Elmira Stove Works failed to certify refrigerator-freezers as compliant with the energy conservation standards.

  9. Walk-in Cooler/Walk-in Freezer Refrigeration Systems - Enforcement Policy |

    Office of Environmental Management (EM)

    Department of Energy Walk-in Cooler/Walk-in Freezer Refrigeration Systems - Enforcement Policy Walk-in Cooler/Walk-in Freezer Refrigeration Systems - Enforcement Policy February 1, 2016 DOE will not seek civil penalties or injunctive relief concerning violations of certain energy conservation standards applicable to refrigeration systems of walk-in coolers/walk-in freezers. PDF icon Enforcement Policy - WICF (02/01/2016) PDF icon Enforcement Policy - WICF (8/31/2015 - OBSOLETE) PDF icon

  10. TEC Working Group Topic Groups Section 180(c) | Department of Energy

    Office of Environmental Management (EM)

    Section 180(c) TEC Working Group Topic Groups Section 180(c) Section 180(c) is a provision in the Nuclear Waste Policy Act that requires DOE to implement a program of technical and financial assistance to states for training public safety officials of appropriate units of local government and to Indian tribes through whose jurisdictions the Department plans to transport spent nuclear fuel or high-level waste to a facility authorized under the Nuclear Waste Policy Act. The training would cover

  11. FMT Workforce FTEs by Scope Current Contract Scope of Work (Section J. Appendix A)

    National Nuclear Security Administration (NNSA)

    FMT Workforce FTEs by Scope Current Contract Scope of Work (Section J. Appendix A) FTE's* Directed Stockpile Work (DSW) 1,329 Campaigns 260 Readiness in Technical Base & Facilities (RTBF) and Site Stewardship 110 Secure Transportation Asset (STA) 125 Security (Physical and Cyber) 160 Other NNSA/Other DOE 310 includes ICO and Emergency Response Non-DOE (Work for Others) 360 Total FTE's 2,654 *FTEs shown include allocation of indirect FTE's

  12. Elmira Stove Works: Order (2011-CE-1407)

    Broader source: Energy.gov [DOE]

    DOE ordered Elmira Stove Works to pay a $6,000 civil penalty after finding Elmira Stove Works had failed to certify that certain models of refrigerator-freezers comply with the applicable energy conservation standard.

  13. DOE Testing Finds Two Kenmore-Brand Freezers Noncompliant | Department of

    Office of Environmental Management (EM)

    Energy Testing Finds Two Kenmore-Brand Freezers Noncompliant DOE Testing Finds Two Kenmore-Brand Freezers Noncompliant August 13, 2012 - 1:53pm Addthis The U.S. Department of Energy's ("DOE") Office of Enforcement recently issued a Notice of Noncompliance Determination to Sears, Roebuck & Co. ("Sears") regarding two Kenmore-brand chest freezers, basic model 255.19502010 ("19502" or "1950") and basic model 255.19702010 ("19702" or

  14. VEA-0015- In the Matter of Sub-Zero Freezer Co.

    Broader source: Energy.gov [DOE]

    Sub-Zero Freezer Co. (Sub-Zero), GE Appliances (GE), and Whirlpool Corporation (Whirlpool) filed appeals of our November 3, 2000 decision, granting Viking Range Corporation (Viking) a six-month...

  15. Demonstration Assessment of Light-Emitting Diode (LED) Freezer Case Lighting

    SciTech Connect (OSTI)

    Rishman, E. E.; Tuenge, J. R.

    2009-10-01

    This report describes the process and results of a demonstration of solid-state lighting (SSL) technology combined with occupancy sensors in a set of upright grocery store freezer cases.

  16. DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT 1. CONTRACT PURPOSE The major purpose of this contract is to operate and maintain the Waste Isolation Pilot Plant (WIPP) and to implement the DOE's National Transuranic Waste program (NTP). The overall mission of the WIPP and the National Transuranic Waste Program is to protect human health and the environment by safe management, retrieval, characterization, transportation, and disposal of approved wastes. 2. BACKGROUND 2.1

  17. DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C-1 SECTION C PERFORMANCE WORK STATEMENT 1. CONTRACT PURPOSE The major purpose of this contract is to operate and maintain the Waste Isolation Pilot Plant (WIPP) and to implement the DOE's National Transuranic Waste program (NTP). The overall mission of the WIPP and the National Transuranic Waste Program is to protect human health and the environment by safe management, retrieval, characterization, transportation, and disposal of approved wastes. 2. BACKGROUND 2.1 Background: The WIPP is located

  18. Refrigerators and Refrigerator-Freezers (Appendix A1 after May 2, 2011) |

    Energy Savers [EERE]

    Department of Energy Refrigerators and Refrigerator-Freezers (Appendix A1 after May 2, 2011) Refrigerators and Refrigerator-Freezers (Appendix A1 after May 2, 2011) The Department of Energy (DOE) develops standardized data templates for reporting the results of tests conducted in accordance with current DOE test procedures. Templates may be used by third-party laboratories under contract with DOE that conduct testing in support of ENERGY STAR® verification, DOE rulemakings, and enforcement

  19. Field Demonstration of High Efficiency Ultra-Low-Temperature Laboratory Freezers

    Broader source: Energy.gov [DOE]

    Ultra-low temperature laboratory freezers (ULTs) are some of the most energy-intensive pieces of equipment in a scientific research laboratory, yet there are several barriers to user acceptance and adoption of high-efficiency ULTs. One significant barrier is a relative lack of information on ULT efficiency to help purchasers make informed decisions with respect to efficient products.

  20. Microsoft Word - RL14788-Section_J-11 Sup work desc tables.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SUPPLEMENTAL WORK DESCRIPTION TABLES The table entitled, CONTRACT LINE ITEM NUMBER (CLIN) ASSIGNMENT AGAINST CONTRACT STRUCTURE, is included as a separate file....

  1. Microsoft Word - RL14788-Section_J-11 Sup work desc tables.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SUPPLEMENTAL WORK DESCRIPTION TABLES The table entitled, CONTRACT LINE ITEM NUMBER (CLIN) ASSIGNMENT AGAINST CONTRACT STRUCTURE, is included as a separate file.

  2. SECTION L … ATTACHMENT xx … KEY PERSONNEL AND CRITICAL WORK AREA PERSONNEL RESUME ELEMENTS

    National Nuclear Security Administration (NNSA)

    2] Attachment L-3a KEY PERSONNEL RESUME ELEMENTS 1. Name of Offeror: 2. Name of Key Person: 3. Proposed Position: 4. Duties and Responsibilities in Proposed Position including elements of SOW assigned: 5. Chronological Work History: Start with current position and work backwards. A. Name and Address of Firm: B. Position(s) Held: C. Dates of Employment: D. General Summary of Responsibilities: Provide a concise description of major duties and responsibilities for each job relevant to the proposed

  3. Technical support document: Energy efficiency standards for consumer products: Refrigerators, refrigerator-freezers, and freezers including draft environmental assessment, regulatory impact analysis

    SciTech Connect (OSTI)

    1995-07-01

    The Energy Policy and Conservation Act (P.L. 94-163), as amended by the National Appliance Energy Conservation Act of 1987 (P.L. 100-12) and by the National Appliance Energy Conservation Amendments of 1988 (P.L. 100-357), and by the Energy Policy Act of 1992 (P.L. 102-486), provides energy conservation standards for 12 of the 13 types of consumer products` covered by the Act, and authorizes the Secretary of Energy to prescribe amended or new energy standards for each type (or class) of covered product. The assessment of the proposed standards for refrigerators, refrigerator-freezers, and freezers presented in this document is designed to evaluate their economic impacts according to the criteria in the Act. It includes an engineering analysis of the cost and performance of design options to improve the efficiency of the products; forecasts of the number and average efficiency of products sold, the amount of energy the products will consume, and their prices and operating expenses; a determination of change in investment, revenues, and costs to manufacturers of the products; a calculation of the costs and benefits to consumers, electric utilities, and the nation as a whole; and an assessment of the environmental impacts of the proposed standards.

  4. 2014-06-23 Issuance: Energy Conservation Standards for Walk-in Coolers and Freezers; Air-Conditioning, Heating, & Refrigeration Institute Petition for Reconsideration

    Broader source: Energy.gov [DOE]

    This document is the agency response to the Energy Conservation Standards for Walk-in Coolers and Freezers; Air-Conditioning, Heating, & Refrigeration Institute Petition for Reconsideration.

  5. Enforcement Policy Statement Regarding Walk-in Cooler/Walk-in Freezer Refrigeration Systems

    Office of Environmental Management (EM)

    Issued: August 14, 2015 Updated: August 31, 2015 NOTE: This policy is not currently in effect. As noted below, this policy will become effective only if the requirement in section (2) below is satisfied. The Appliance Standards and Rulemaking Advisory Committee (ASRAC) established a working group to engage in negotiations concerning the rulemaking contemplated in the settlement agreement described below, and the first working group meeting was held on August 27, 2015. Under section (2), this

  6. Measurement and Basic Physics Committee of the US cross-section evaluation working group. Annual report 1996

    SciTech Connect (OSTI)

    Smith, D.L.; McLane, V.

    1996-11-01

    The Cross-Section Evaluation Working Group (CSEWG) is a long-standing committee charged with the responsibility for organizing and overseeing the U.S. cross-section evaluation effort. It`s main product is the official U.S. evaluated nuclear data file, ENDF. The current version of this file is Version VI. All evaluations included in ENDF are reviewed and approved by CSEWG and issued by the U.S. Nuclear Data Center, Brookhaven National Laboratory. CSEWG is comprised of volunteers from the U.S. nuclear data community who possess expertise in evaluation methodologies and who collectively have been responsible for producing most of the evaluations included in ENDF. In 1992 CSEWG added the Measurements Committee to its list of standing committees and subcommittees. This action was based on a recognition of the importance of experimental data in the evaluation process as well as the realization that measurement activities in the U.S. were declining at an alarming rate and needed all possible encouragement to avoid the loss of this resource. The mission of the Committee is to maintain a network of experimentalists in the U.S. that would provide needed encouragement to the national nuclear data measurement effort through improved communication and facilitation of collaborative activities. In 1994, an additional charge was added to the responsibilities of this Committee, namely, to serve as an interface between the more applied interests represented in CSEWG and the basic nuclear science community. This annual report is the second such document issued by the Committee. It contains voluntary contributions from eleven laboratories in the U.S. which have been prepared by members of the Committee and submitted to the Chairman for compilation and editing. It is hoped that the information provided here on the work that is going on at the reporting laboratories will prove interesting and stimulating to the readers.

  7. Switchover software reliability estimate for Paducah Freezer/Sublimer computer systems

    SciTech Connect (OSTI)

    Flanagan, D.M.; Davis, J.N.

    1993-04-01

    K-25 Engineering Division purchased a series of redundant computer systems and developed software for the purpose of providing continuous process monitoring and control for the Freezer/Sublimer equipment in the gaseous diffusion process at the Paducah Gaseous Diffusion Plant. The application software is loaded on two central processing units (CPU) so that in the event of a failure of the primary unit, the processing can switch to the backup unit and continue processing without error. It is the purpose of this document to demonstrate the reliability of this system with respect to its ability to switch properly between redundant CPU. The total reliability estimation problem -- which considers the computer hardware, the operating system software, and the application software -- has been reduced to one that considers only the application software directly involved in the switchover process. Estimates are provided for software reliability and the testing coverage. Software and hardware reliability models and reliability growth models are considered in addition to Bayesian approaches.

  8. Enforcement Policy Statement Regarding Walk-in Cooler/Walk-in Freezer Refrigeration Systems

    Office of Environmental Management (EM)

    August 14, 2015 NOTE: This policy is not currently in effect. As noted below, this policy will become effective only if the requirements in section (2) below are satisfied. ASRAC has established a working group to engage in negotiations regarding the rulemaking described below. Therefore, section (2) specifies that the policy will become effective if the Department of Energy receives recommended standards from ASRAC within a specified time frame. We will update this website to alert the public

  9. SECTION C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C-1 PART 1 - THE SCHEDULE SECTION C DESCRIPTION/SPECIFICATIONS/PERFORMANCE WORK STATEMENT TABLE OF CONTENTS C.1 Hanford Occupational Medical Program .................................................................C-3 C.2 Description of Program Performance Requirements ................................................C-6 C.2.1 Firm Fixed Price Scope...................................................................................C-6 C.2.1.1 Medical Monitoring and Qualification Examinations

  10. Feb. 7 Science Series Lecturer to Discuss Living & Working in the Arctic |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jefferson Lab 7 Science Series Lecturer to Discuss Living & Working in the Arctic NEWPORT NEWS, VA, Jan. 19, 2012 - The Thomas Jefferson National Accelerator Facility hosts its next Science Series lecture on Tuesday, Feb. 7, with a discussion about carrying out research in a freezer - the extreme cold of the Arctic. Guest speaker Victoria Hill, an oceanographer with Old Dominion University's bio-optics group, will talk about the work she and colleagues have undertaken to try to explain

  11. 2014-09-23 Issuance: Energy Conservation Standard for Walk-in Coolers and Freezers; Air-Conditioning, Heating, & Refrigeration Institute Petition for Reconsideration Notice of Public Meeting

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of public meeting regarding energy conservation standards for walk-in coolers and freezers; Air-Conditioning, Heating, & Refrigeration Institute petition for reconsideration, as issued by the Deputy Assistant Secretary for Energy Efficiency on September 23, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  12. Residential Freezers (Appendix B)

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) develops standardized data templates for reporting the results of tests conducted in accordance with current DOE test procedures. Templates may be used by third-party laboratories under contract with DOE that conduct testing in support of ENERGY STAR verification, DOE rulemakings, and enforcement of the federal energy conservation standards.

  13. SECTION H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Contract Section H Contract No. DE-AC27-08RV14800 Modification No. 360 H-i PART I - THE SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 WORKFORCE ...

  14. SECTION E

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E Contract No. DE-AC27-01RV14136 Conformed Thru Modification No. A143 E - i SECTION E INSPECTION AND ACCEPTANCE WTP Contract Section E Contract No. DE-AC27-01RV14136 Conformed Thru Modification No. A143 E - ii SECTION E INSPECTION AND ACCEPTANCE TABLE OF CONTENTS Section Clause Page E.1 DEAR 952.236-71 INSPECTION (APR 1994) ................................................................................ 1 E.2 INSPECTION AND ACCEPTANCE

  15. SECTION G

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G-1 PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.1 CORRESPONDENCE PROCEDURES ......

  16. SECTION J

    Energy Savers [EERE]

    K-1 SECTION J APPENDIX K CONTRACTOR'S TRANSITION PLAN (RESERVED) Contract No.: DE-RW0000005 QA:QA J-K-2

  17. SECTION J

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A-1 SECTION J APPENDIX A ADVANCE UNDERSTANDING ON HUMAN RESOURCES (TO BE NEGOTIATED DURING CONTRACT TRANSITION) The personnel appendix required by DEAR Subpart 970.31 entitled...

  18. SECTION J

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    J-F-1 SECTION J APPENDIX F CRITICAL STAFF Subject Matter Expert Subject Matter Canister Transfer Machine Engineering Waste Package Transfer Trolley Engineering Transport and ...

  19. SECTION I

    National Nuclear Security Administration (NNSA)

    to Mod 0108 DE-NA0000622 Section I, Page i PART II - CONTRACT CLAUSES SECTION I CONTRACT CLAUSES TABLE OF CONTENTS I-1 FAR 52.202-1 DEFINITIONS (NOV 2013) (AS MODIFIED BY DEAR 952.202-1) (REPLACED MODS 020, 029, 0084) ................................................................................................................................ 1 I-2 FAR 52.203-3 GRATUITIES (APR 1984) ................................................................................................. 1 I-3 FAR

  20. SECTION H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    H Contract No. DE-AC06-08RL14788 Modification 499 PART I - THE SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 WORKFORCE TRANSITION ......

  1. SECTION H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    H Contract No: DE-AC06-09RL14728 Modification 491 H-i PART I - THE SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 WORKFORCE TRANSITION ......

  2. Section CC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC06-09RL14728 Modification 464 J-11-1 ATTACHMENT J-11 CONTRACT DELIVERABLES TABLE J-11.1 DELIVERABLE LIST FROM SECTION C (SOW) ID Deliverable DOE Contract...

  3. Section 66

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 ) (CF 2 Cl 2 ) (CHFCl 2 ) SF 6 CF 4 CCl 4 Session Papers 277 Figure 1. Spectral absorption cross-sections of CF 4 between 1281 and 1284 cm . The experimental -1 conditions...

  4. SECTION J

    Energy Savers [EERE]

    J-1 SECTION J APPENDIX J PERFORMANCE EVALUATION AND MEASUREMENT PLAN (TO BE NEGOTIATED AFTER CONTRACT AWARD) Contract No.: DE-RW0000005 QA:QA J-J-2 Page Blank

  5. Section I

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in Near-symmetric Collisions of 10A MeV Heavy Ions with Solid Targets V. Horvat, . Smit, R. L. Watson and K. Zaharakis Energy Dependence of Electron Loss Cross Sections for...

  6. Section 92

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Model E. J. Mlawer and S. A. Clough Atmospheric and Environmental Research, Inc. Cambridge, Massachusetts Introduction This work describes recent advances in the rapid...

  7. Section I

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    insert in any subcontracts for construction, alterations and repairs within the United States the clauses entitled- (1) Construction Wage Rate Requirements; (2) Contract Work...

  8. Section CC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    30 J-12-1 ATTACHMENT J-12 GOVERNMENT FURNISHED SERVICES AND INFORMATION TABLE J-12.1 GFS/I LIST FROM SECTION C (SOW) ID GFS/I GFS/I Due Contract Section GF0001 DOE will administer MOUs with other law enforcement agencies or other Federal agencies (e.g., U.S. Department of Defense [Yakima Training Center]). DOE will provide copies of MOUs and/or contracts to the MSC. As required C.2.1.1.1 GF0002 DOE will provide Federal Commissions for Hanford Patrol personnel. As required C.2.1.1.1 GF0003 DOE

  9. Section 10

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    need to parameterize the tilting structure of MCSs in GCMs. Figure 1, where the bulk Richardson number is chosen The objective of this work is to parameterize the large-scale and...

  10. Section B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... shall comply with the Hanford Site "Stop Work" Policy. ... address is: Susan E. Bechtel (A007) Contracting Officer ... Reports to the CIAC may be sent via email to ciac@ciac.org, ...

  11. It worked

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Yes, it worked

  12. SECTION B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY15 PEMP - May 13, 2015 1 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) ANNUAL FEE PLAN (AFP) 1 OCTOBER 2014 THROUGH 30 SEPTEMBER 2015 CONTRACT DE-EM0001971 May 13, 2015 I. INTRODUCTION This Performance Evaluation and Measurement Plan (PEMP) contains a standard process for development, administration, and coordination of all phases of the fee determination process consistent with Section B.2 of the subject contract. II. ORGANIZATIONAL STRUCTURE AND DUTIES The following organizational

  13. Section L

    National Nuclear Security Administration (NNSA)

    Section L - Attachment F - Past Performance Cover Letter and Questionnaire Date: ________________ Dear _________________: Our firm is submitting a proposal for a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Contract for the management and operation of the Nevada National Security Site with an estimated value of approximately $550M per year. Our firm is seeking your assistance. We are asking you to complete the attached questionnaire evaluating our performance on

  14. Section J

    Energy Savers [EERE]

    M-1 Section J Appendix M Key Design, Licensing and Site Management M&O Milestone Chart Activity Planned Date Develop and Submit CD-2 (25%-30%) 08/2009 Submission of Construction Performance Specifications - Balance of Plant Support Facilities (OCRWM Start of Construction 3/2012) TBD Submission of Construction Performance Specifications - Initial Handling Facility (IHF) (OCRWM Start of Construction for IHF: 9/2013) TBD Submission of Construction Performance Specifications - Wet Handling

  15. Section Number:

    Energy Savers [EERE]

    QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVES Pursuant to the contract clause entitled, "Laws, Regulations, and DOE Directives," the following list of directives is applicable to this contract. List A Pursuant to the contract clause entitled, "Laws, Regulations, and DOE Directives," the Contractor shall comply with the requirements of applicable Federal, State, and local laws and regulations, unless relief has been granted in writing by the appropriate

  16. SECTION J

    Energy Savers [EERE]

    D-1 SECTION J APPENDIX D KEY PERSONNEL Name Position Doug Cooper General Manager John Donnell Repository Licensing Lead Al Ebner, PE, PhD Repository Design Lead Steve Piccolo Deputy General Manager Steve White Quality & Performance Assurance Lead George Clare Project Management & Integration Lead Mike Hitchler Preclosure Safety Analysis Lead Contract No.: DE-RW0000005 QA:QA J-D-2 POSITION DESCRIPTIONS OCRWM SPECIFIED KEY PERSONNEL 1. General Manager: Requires 10 years experience as a

  17. SECTION J

    Energy Savers [EERE]

    H-1 SECTION J APPENDIX H CONTRACT GUIDANCE FOR PREPARATION OF DIVERSITY PLAN This Guidance is to assist the Contractor in understanding the information being sought by the Department for each of the Diversity elements and where these issues may already be addressed in the contract. To the extent these issues are already addressed in the contract, the Contractor need only cross reference the location. Contractor's Workforce The Department's contracts contain clauses on Equal Employment

  18. SECTION J, APPENDIX A - SOW

    National Nuclear Security Administration (NNSA)

    0007749 SECTION J, APPENDIX A: STATEMENT OF WORK TABLE OF CONTENTS CHAPTER I. OBJECTIVES, SCOPE, AND REQUIREMENTS ......................................................................... 1 1.0 OBJECTIVE .................................................................................................................................................. 1 2.0 BACKGROUND

  19. Section 52

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 On the Extension of Rapid Radiative Transfer Model to the Shortwave Region E.J. Mlawer and S.A. Clough Atmospheric and Environmental Research, Inc. Cambridge, Massachusetts Introduction In this work we describe the second phase in the development of the rapid radiative transfer model (RRTM) (Mlawer et al. 1996), a rapid and accurate radiative transfer model designed for climate applications. The initial phase of RRTM, which uses the correlated-k method for radiative transfer, allowed the

  20. Section J

    Energy Savers [EERE]

    L-1 Section J Appendix L MEMORANDUM FROM DAVID R. HILL, GENERAL COUNSEL, DATED NOVEMBER 30, 2006, SUBJECT: ONGOING LICENSING SUPPORT NETWORK ("LSN") OBLIGATIONS Contract No.: DE-RW0000005 QA:QA J-L-2 Contract No.: DE-RW0000005 QA:QA J-L-3 Contract No.: DE-RW0000005 QA:QA J-L-4 Contract No.: DE-RW0000005 QA:QA J-L-5 Contract No.: DE-RW0000005 QA:QA J-L-6 Contract No.: DE-RW0000005 QA:QA J-L-7 Contract No.: DE-RW0000005 QA:QA J-L-8 Contract No.: DE-RW0000005 QA:QA J-L-9 Contract No.:

  1. STATEMENT OF WORK

    National Nuclear Security Administration (NNSA)

    PART III - SECTION J APPENDIX B STATEMENT OF WORK Table of Contents 1.0 General.................................................................................................................... 273 2.0 Laboratory Mission and Scope of Work. ................................................................ 274 3.0 Science & Technology. ........................................................................................... 275 3.1 Defense Programs.

  2. Residential Freezers (Appendix B1)

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) develops standardized data templates for reporting the results of tests conducted in accordance with current DOE test procedures. Templates may be used by third-party laboratories under contract with DOE that conduct testing in support of ENERGY STAR® verification, DOE rulemakings, and enforcement of the federal energy conservation standards.

  3. SECTION J - TABLE OF CONTENTS

    National Nuclear Security Administration (NNSA)

    Conformed to Mod 0108 DE-NA0000622 Section J Page i PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J LIST OF APPENDICES TABLE OF CONTENTS Appendix A Statement of Work (Replaced by Mod 002; Modified Mod 016; Replaced Mod 029) Appendix B Performance Evaluation Plan (Replaced by Mods 002, 016, 020, 029, 0084) Appendix C Contractor's Transition Plan Appendix D Sensitive Foreign Nations Control Appendix E Performance Guarantee Agreement(s) Appendix F National Work Breakdown

  4. Part III: Section C - Description, Specification, Statement of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECTION C DESCRIPTIONSPECIFICATION STATEMENT OF WORK DE-AC36-08GO28308 Modification M901 Section C - Page ii PART I SECTION C DESCRIPTIONSPECIFICATION STATEMENT OF WORK TABLE ...

  5. Working Copy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in document or attachment. Added 20.7.10.600 NMAC to References section. 7 Global editorial changes Revised the Acronyms list Added a statement to Section 1.0 on Quality...

  6. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S....

  7. SECTION J, APPENDIX A - SOW

    National Nuclear Security Administration (NNSA)

    Mod 002; Modified Mod 016; Replaced Mod 029; Modified Mod 0049) Honeywell FM&T, LLC Contract No. DE-NA0000622 SECTION J APPENDIX A STATEMENT OF WORK 09/19/12 TABLE OF CONTENTS CHAPTER I. OBJECTIVES, SCOPE, AND REQUIREMENTS ......................................................................... 1 1.0 OBJECTIVE .................................................................................................................................................. 1 2.0 BACKGROUND

  8. Section D - G

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECTION D PACKAGING AND MARKING Request for Proposal #DE-RFP 36-07GO97036 PART I SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 Packaging................................................................................................................... 1 D.2 Marking ..................................................................................................................... 1 Section D - Page ii Request for Proposal #DE-RFP 36-07GO97036 PART I SECTION D PACKAGING AND MARKING D.1

  9. SECTION L… ATTACHMENT H

    National Nuclear Security Administration (NNSA)

    III-SECTION J APPENDIX K TRANSITION PLAN To be Added at a Later Date

  10. Mon Valley work plan

    Office of Legacy Management (LM)

    GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for Characterization Activities at the Shiprock UMTRA Project Site June 1998 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number UGW-511-0020-01-000 Document Number U0013400 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in

  11. Quality Work Plan Checklist and Resources - Section 3

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Control Inspector Certification Exam - Presentation A self-assessment to ... V.5.3 3 Can you provide DOE a copy of your monitoring inspection form? How to create a ...

  12. 14655 Section H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section H Contract No. DE-AC06-05RL14655 H-i PART I - THE SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 INCUMBENT EMPLOYEES HIRING PREFERENCES ...

  13. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    E SECTION J APPENDIX E PERFORMANCE GUARANTEE AGREEMENT(S) [Note: To be inserted by the Contracting Officer prior to contract award. For Performance Guarantee Agreement(s) template, see Section L, Attachment A.]

  14. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    I SECTION J APPENDIX I SMALL BUSINESS SUBCONTRACTING PLAN Note: To be inserted by the Contracting Officer prior to...

  15. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    I SECTION J APPENDIX I SMALL BUSINESS SUBCONTRACTING PLAN [Note: To be inserted by the Contracting Officer prior to

  16. Neutrino Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ν2006 1 Neutrino Cross Section Measurements with MiniBooNE Outline: - overview - neutrino reaction channels and event totals - CC channels, preliminary results - NC channels, (new) preliminary results - antineutrino running R. Tayloe, Indiana U. ν2006 2 Neutrino Cross Sections - The main goal of MiniBooNE (MB) is a ν µ → ν e search (B. Fleming, next session) - High rates and good particle ID also allow accurate cross section measurements. - Important for MB and other oscillation

  17. Part IV: Section D - Packaging and Marking

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PART I SECTION D PACKAGING AND MARKING DE-AC36-08GO28308 Modification M901 Section D - Page ii PART I SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 Packaging 1 D.2 Marking 1 DE-AC36-08GO28308 Modification M901 Section D - Page 1 of 1 PART I SECTION D PACKAGING AND MARKING D.1 Packaging Preservation, packaging, and packing for shipment or mailing of all work delivered hereunder shall be in accordance with good commercial practice and adequate to insure acceptance by common carrier and

  18. Section 106 Archaeology Guidance

    Broader source: Energy.gov [DOE]

    The Advisory Council on Historic Preservation's Section 106 guidance is designed to assist federal agencies in making effective management decisions about archaeological resources in completing the requirements of Section 106 of the National Historic Preservation Act (16 U.S.C. 470f) and its implementing regulations (36 CFR Part 800). This guidance highlights the decision-making role of the federal agency in the Section 106 process. It is also designed for use by State and Tribal Historic Preservation Officers, Indian tribes, Native Hawaiian organizations, and cultural resource management professionals when assisting federal agencies to meet their responsibilities under Section 106.

  19. PART III ? SECTION J

    National Nuclear Security Administration (NNSA)

    B, Page 1 SECTION J APPENDIX B AWARD FEE PLAN Note: To be inserted by the Contracting Officer after contract award....

  20. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 J-1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J -- LIST OF ATTACHMENTS TABLE OF CONTENTS Attachment Number Title of Attachment Modification Number...

  1. PART III ? SECTION J

    National Nuclear Security Administration (NNSA)

    M, Page 1 SECTION J APPENDIX M CONTRACTOR COMMITMENTS, AGREEMENTS, AND UNDERSTANDINGS Note: To be inserted by the Contracting Officer after contract award....

  2. 14655 Section D

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Contract No. DE-AC06-05RL14655 A000 PART I - THE SCHEDULE SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 PACKAGING......

  3. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    L, Page 1 SECTION J APPENDIX L SPECIAL FINANCIAL INSTITUTION AGREEMENT FOR USE WITH THE ... and ... the Financial Institution a financial institution ...

  4. Sectional device handling tool

    DOE Patents [OSTI]

    Candee, Clark B. (Monroeville, PA)

    1988-07-12

    Apparatus for remotely handling a device in an irradiated underwater environment includes a plurality of tubular sections interconnected end-to-end to form a handling structure, the bottom section being adapted for connection to the device. A support section is connected to the top tubular section and is adapted to be suspended from an overhead crane. Each section is flanged at its opposite ends. Axially retractable bolts in each bottom flange are threadedly engageable with holes in the top flange of an adjacent section, each bolt being biased to its retracted position and retained in place on the bottom flange. Guide pins on each top flange cooperate with mating holes on adjacent bottom flanges to guide movement of the parts to the proper interconnection orientation. Each section carries two hydraulic line segments provided with quick-connect/disconnect fittings at their opposite ends for connection to the segments of adjacent tubular sections upon interconnection thereof to form control lines which are connectable to the device and to an associated control console.

  5. Section I - Contract Clauses

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AC27-10RV15051 Conformed thru Contract Modification No. 106 I-1 PART II - CONTRACT CLAUSES SECTION I - CONTRACT CLAUSES TABLE OF CONTENTS Section I - Contract Clauses ................................................................................................................... 4 I.1 FAR 52.202-1 Definitions. (JUL 2004) ....................................................................................... 4 I.2 FAR 52.203-3 Gratuities (APR 1984)

  6. 14655 Section D

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Contract No. DE-AC06-05RL14655 A000 PART I - THE SCHEDULE SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 PACKAGING......................................................................................................................................1 D.2 MARKING ..........................................................................................................................................1 D-i River Corridor Closure Contract Section D Contract No. DE-AC06-05RL14655 A000 PART I

  7. Working Copy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    99-3119 Compliance Monitoring Implementation Plan for 40 CFR §191.14(b), Assurance Requirement U. S. Department of Energy Revision 8 October 2014 This document supersedes Revision 7 of DOE/WIPP-99-3119. Working Copy Compliance Monitoring Implementation Plan DOE/WIPP-99-3119, Rev. 8 2 This document has been submitted as required to: U.S. Department of Energy Office of Scientific and Technical Information PO Box 62 Oak Ridge, TN 37831 (865) 576-8401 Additional information about this document may

  8. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J Contract No. DE-AC06-08RL14655 640 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J LIST OF ATTACHMENTS TABLE OF CONTENTS ATTACHMENT J-1 TABLE OF RIVER...

  9. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, Mod 332 J.6-1 ATTACHMENT J.6 SMALL BUSINESS SUBCONTRACTING PLAN Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788 Attachment J.6, Mod 332 J.6-2 SMALL...

  10. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    E SECTION J APPENDIX E PERFORMANCE GUARANTEE AGREEMENT(S) Note: To be inserted by the Contracting Officer prior to contract award. For Performance Guarantee Agreement(s) template,...

  11. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0, Revision 4 ATTACHMENT J.10 WAGE DETERMINATIONS - SERVICE CONTRACT ACT (SCA) AND DAVIS-BACON ACT J.10-1 Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788...

  12. 6Li Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 12152015) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2004TU02 6Li(p, ): coincidence yields, deduced S-factors low 1, S-factors from...

  13. 7Li Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 12162015) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1997GO13 7Li(pol. p, ): total , S-factor for capture to third-excited state 0 -...

  14. HASQARD Section 4

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section 4.2.4, Volume 2, Revision 3 requires: "The field custodian shall seal the cap of the individual sample container so that any tampering is easy to detect. Custody...

  15. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    J, Page 1 SECTION J APPENDIX J DIVERSITY PLAN GUIDANCE In accordance with Section I clause DEAR 970.5226-1, Diversity Plan, this Appendix provides guidance to assist the Contractor in understanding the information being sought by the Department of Energy, National Nuclear Security Administration (DOE/NNSA) for each of the diversity elements within the clause. The Contractor shall submit a Diversity Plan to the Contracting Officer for approval within 90 days after the effective date of this

  16. Section 1251 Report Update

    National Nuclear Security Administration (NNSA)

    November 2010 Update to the National Defense Authorization Act of FY2010 Section 1251 Report New START Treaty Framework and Nuclear Force Structure Plans 1. Introduction This paper updates elements of the report that was submitted to Congress on May 13, 2010, pursuant to section 1251 of the National Defense Authorization Act for Fiscal Year 2010 (Public Law 111-84) ("1251 Report"). 2. National Nuclear Security Administration and modernization of the complex - an overview From FY 2005

  17. Section I: Contract Clause

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... 52.225-10 Notice Of Buy American Requirement - Construction ... I.93 952.204-75 Public Affairs (Dec ... Environment, Safety, and Health into Work Planning and ...

  18. Part IV: Section F - Deliveries or Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    F DELIVERIES OR PERFORMANCE DE-AC36-08GO28308 Modification M933 Section F - Page ii PART I SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENT F.1 Term of Contract 1 F.2 Principal Place of Performance 1 F.3 FAR 52.242-15 Stop-Work Order (Aug 1989) (Alternate 1) (Apr 1984) 1 DE-AC36-08GO28308 Modification M933 Section F - Page 1 of 2 PART I SECTION F DELIVERIES OR PERFORMANCE F.1 Term of Contract (a) This contract shall be effective as specified in Block No. 28, Award Date, of SF 33, and shall

  19. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, Mod 420 J.6-1 ATTACHMENT J.6 SMALL BUSINESS SUBCONTRACTING PLAN Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788 Attachment J.6, Mod 420 J.6-2 SMALL BUSINESS SUBCONTRACTING PLAN for United States Department of Energy Plateau Remediation Contract Submitted by: CH2M HILL PLATEAU REMEDIATION COMPANY Prime Contractor FISCAL YEARS 2009-2018 (Base and Option Period) CONTRACT NUMBER DE-AC06-08RL14788 Revision 4 December 30, 2014 Plateau Remediation Contract Section J Contract

  20. 14655 Section E

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E Contract No. DE-AC06-05RL14655 A000 PART I - THE SCHEDULE SECTION E INSPECTION AND ACCEPTANCE TABLE OF CONTENTS E.1 FAR 52.246-5 INSPECTION OF SERVICES - COST REIMBURSEMENT (APR 1984) .................1 E.2 FIELD INSPECTION ..........................................................................................................................1 E.3 DOE INSPECTION ............................................................................................................................2 E.4

  1. SECTION I - CONTRACT CLAUSES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    I-1 PART II -CONTRACT CLAUSES SECTION I TABLE OF CONTENTS The following Clauses apply to the Scope of the Contract ........................................................ 8 I.1 FAR 52.202-1 DEFINITIONS (JUL 2004) as modified by DEAR 952.202-1 (MAR 2002) .................................................................................................................................. 8 I.2 FAR 52.203-3 GRATUITIES (APR 1984) ...................................................................... 8

  2. SECTIONS B THROUGH H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B Contract No. DE-AC06-08RL14788 Modification 486 B-i PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS TABLE OF CONTENTS B.1 TYPE OF CONTRACT ................................................................................................ B-1 B.2 ITEM(S) BEING ACQUIRED ....................................................................................... B-1 B.3 OBLIGATION AND AVAILABILITY OF FUNDS ........................................................... B-5 B.4 CONTRACT

  3. SECTIONS B THROUGH H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B Contract No. DE-AC27-08RV14800 Modification No. 372 B-i PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS TABLE OF CONTENTS B.1 TYPE OF CONTRACT .................................................................................................... 2 B.2 ITEM(S) BEING ACQUIRED ........................................................................................... 2 B.3 OBLIGATION AND AVAILABILITY OF FUNDS ............................................................. 3 B.4

  4. 16O Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Incomplete) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1973MC12 16O(p, ): threshold - 7.7 X4 10172012 1981DY03 16O(p, p): for production of...

  5. 11B Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1B(p, X) (Current as of 12172015) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2004RO27, 2004SP03 11B(p, ): deduced , S-factor Ecm 0 - 1 X4 11072012...

  6. 18O Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8O(p, X) (Current as of 05152012) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2008LA06 18O(p, ): deduced S-factor Ecm 0 - 1.5 46 12032012...

  7. 10B Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 05152012) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2010LA11 10B(p, ): deduced S(E) E(cm) 0 - 0.15 1 11302011 1993AN06 10B(p, ):...

  8. 20Ne Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 05152012) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1981DY03 20Ne(p, p'): for production of -rays threshold - 23 1.63-MeV -rays...

  9. 9Be Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 12162015) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1997ZA06 9Be(p, ), (p, d): S-factor 16 - 390 keV X4 01232013 1973SI27 9Be(p,...

  10. 19F Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Incomplete) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1990WA10 19F(p, n): < 30 X4 04262012 2008CO03 19F(p, ): Ecm 200 - 700 keV X4 0514...

  11. 13C Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 12172015) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2001NE15 13C(p, ): , deduced S(E) ratio < 160 keV X4 09122011 1994KI02 13C(p,...

  12. 14N Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    N(p, X) (Incomplete) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2003MU12 14N(p, ): deduced astrophysical S-factors < 600 keV X4 05062013 1990WA10 14N(p, n):...

  13. 15N Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 05152012) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1990WA10 15N(p, n): < 30 X4 04262012 1982RE06 15N(p, ): 78 - 810 keV X4...

  14. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, Modification 332 J.7-1 ATTACHMENT J.7 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM TARGETS Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788 Attachment J.7, Modification 332 J.7-2 Small Disadvantaged Business (SDB) Participation Program Targets ATTACHMENT J.7 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM TARGETS (a) OFFEROR - CH2M HILL Plateau Remediation Company - Prime: AREVA Federal Services, LLC; Fluor Federal Services, Inc. (base period only); East

  15. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, Revision 3, 420 J.8-1 ATTACHMENT J.8 ADVANCE UNDERSTANDING OF COSTS In accordance with the Section H Clause entitled, Advance Understanding of Costs, this attachment sets forth the basis for determining the allowability of costs associated with expenditures that have cost implications under the Contract, that are not identified in other documents requiring the review and approval of the contracting officer. Unless a date is provided within an item of cost identified below, all items within

  16. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    L, Page 1 SECTION J APPENDIX L SPECIAL FINANCIAL INSTITUTION AGREEMENT FOR USE WITH THE PAYMENTS-CLEARED FINANCING ARRANGEMENT Note: (1) The Contractor shall enter into a new banking agreement(s) during the Transition Term of the Contract, utilizing the format contained in this Appendix and include other applicable Contract terms and conditions. (2) Items in brackets [ ] below are provided for clarification and will be removed from the document prior to execution. Agreement entered into this,

  17. Part III - Section J

    National Nuclear Security Administration (NNSA)

    H DIVERSITY PLAN GUIDANCE To Be Updated during Transition With regard to the Contract Section I Clause entitled "Diversity Plan", this Appendix provides guidance to assist the Contractor in understanding the information being sought by the Department for each of the clause's Diversity elements. If the Contractor's current policy or procedure already addresses the following elements, the Contractor need only provide a copy of the policy or procedure to the Contracting Officer and

  18. Part III - Section J

    National Nuclear Security Administration (NNSA)

    Corporation Contract No. DE-AC04-94AL85000 Modification No. 585 Attachment 2 Page 1 of 5 Part III - Section J Appendix G List of Applicable Directives and NNSA Policy Letters In addition to the list of applicable directives referenced below, the contractor shall also comply with supplementary directives (e.g., manuals), which are invoked by a Contractor Requirements Document (CRD) attached to a directive referenced below. This List excludes directives that have been granted an exemption from the

  19. Part III - Section J

    National Nuclear Security Administration (NNSA)

    M280 Attachment 1 Page 1 of 5 Part III - Section J Appendix G List of Applicable Directives and NNSA Policy Letters In addition to the list of applicable directives referenced below, the contractor shall also comply with supplementary directives (e.g., manuals), which are invoked by a Contractor Requirements Document (CRD) attached to a directive referenced below. DIRECTIVE NUMBER DATE DOE DIRECTIVE TITLE APPH Chapter X Revision 10 09/08/98 Accounting Practices & Procedures Handbook Chapter

  20. MODELING AND FISSION CROSS SECTIONS FOR AMERICIUM.

    SciTech Connect (OSTI)

    ROCHMAN, D.; HERMAN, M.; OBLOZINSKY, P.

    2005-05-01

    This is the final report of the work performed under the LANL contract on the modeling and fission cross section for americium isotopes (May 2004-June 2005). The purpose of the contract was to provide fission cross sections for americium isotopes with the nuclear reaction model code EMPIRE 2.19. The following work was performed: (1) Fission calculations capability suitable for americium was implemented to the EMPIRE-2.19 code. (2) Calculations of neutron-induced fission cross sections for {sup 239}Am to {sup 244g}Am were performed with EMPIRE-2.19 for energies up to 20 MeV. For the neutron-induced reaction of {sup 240}Am, fission cross sections were predicted and uncertainties were assessed. (3) Set of fission barrier heights for each americium isotopes was chosen so that the new calculations fit the experimental data and follow the systematics found in the literature.

  1. ORISE Contract, PART 1 ? THE SCHEDULE, Section D Packaging and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SECTION D PACKAGING AND MARKING D.1 PACKAGING (NOV 2004) Preservation, packaging, and packing for shipment or mailing of all work delivered hereunder shall be in accordance with...

  2. Microsoft Word - Section F (Mod 616).docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Contract No. DE-AC06-05RL14655 616 F-i PART I - THE SCHEDULE SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS F.1 PERIOD OF PERFORMANCE AND DELIVERY DATES ................................................................ 1 F.2 PRINCIPAL PLACE OF PERFORMANCE ...................................................................................... 1 F.3 FAR 52.242-15 STOP-WORK ORDER (AUG 1989) -- ALTERNATE I (APR 1984) ...................... 1 River Corridor Closure Contract Section F Contract

  3. 10Be Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Be(p, X) (Current as of 03/01/2016) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1970GO04 10Be(p, γ0): σ 0.6 - 6.3 θ = 0°, θ = 90° 06/05/2012 1987ERZY 10Be(p, n): σ 0.9 - 2 X4 05/15/2012 The following references may be related but not included. 1991GOZV Back to (p, X) Main Page Back to (α, X) Main Page Back to Datacomp Home Page Last modified: 02 March 2016

  4. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, Modification 476 J.2-1 ATTACHMENT J.2 REQUIREMENTS SOURCES AND IMPLEMENTING DOCUMENTS The following lists are provided in accordance with the Section I Clause entitled, DEAR 970.5204-2, Laws, Regulations, and DOE Directives. LIST A: APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS Table J.2.1 Code of Federal Regulations (CFR) Document Number Title 10 CFR 63 Disposal of High-Level Radioactive Wastes in a Geologic Repository at Yucca Mountain, Nevada 10 CFR 71 Packaging And Transportation Of

  5. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0, Revision 5 J.10-1 ATTACHMENT J.10 WAGE DETERMINATIONS - SERVICE CONTRACT ACT (SCA) AND DAVIS-BACON ACT Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788 Attachment J.10, Revision 5 J.10-2 SERVICE CONTRACT ACT WAGE DETERMINATION WD 05-2569 (Rev.-18) was first posted on www.wdol.gov on 07/14/2015 ***************************************************************************** REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR THE SERVICE CONTRACT ACT | EMPLOYMENT

  6. Cross-Section Measurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section Measurement of 2 H(n,np)n at 16 MeV in Symmetric Constant Relative Energy Configurations Alexander Hoff Couture A dissertation submitted to the faculty of the University of North Carolina at Chapel Hill in partial fulfillment of the requirements for the degree of Doctor of Philosophy in the Department of Physics and Astronomy. Chapel Hill 2011 Approved by: T. B. Clegg, Advisor C. R. Howell, Advisor H. J. Karwowski, Reader J. Lu, Reader J. Engel, Reader c 2011 Alexander Hoff Couture ALL

  7. Microsoft Word - Final FY14 WM Committee Work Plan 093013

    Office of Environmental Management (EM)

    4 Work Plan Approved September 25, 2013 1 Northern New Mexico Citizens' Advisory Board (NNMCAB) WASTE MANAGEMENT COMMITTEE 2014 Work Plan SECTION I. MISSION STATEMENT The Northern...

  8. Section L, Paragraph L-4

    National Nuclear Security Administration (NNSA)

    D SECTION L ATTACHMENT D CROSS REFERENCE MATRIX Section L Section M Offeror's Proposal Criterion 1: PAST PERFORMANCE L-15 (a) M-3 (a) Criterion 2: SITE ORGANIZATION AND...

  9. 10B Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 01/21/2015) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1992MC03 10B(α, α): σ relative to Rutherford scattering 1 - 3.3 X4 05/02/2012 1969GA01 10B(α, p), (α α'): relative σ at θ = 90° for Eγ = 1.0 - 3.5 0.170 MeV, 3.088 MeV, 3.682 MeV, 3.852 MeV, 0.717 MeV 06/18/2012 1973VA25 10B(α, n): laboratory differential σ 1.0 - 5.0 for n0: θ = 0°, θ = 90°, θ = 160° X4 04/04/2011 for n1: θ = 0°, θ = 90° for n23: θ = 0°, θ = 90° 10B(α, n):

  10. 11B Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B(α, X) (Current as of 02/01/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1991WA02 11B(α, n): thick-target yield of Eα = 411, 605 and 606 keV resonance 350 - 2400 keV 1 X4 04/04/2011 11B(α, n): for 606-keV resonance 1 11B(α, n): for 411-keV resonance after subtraction of the 605-keV resonance 1 11B(α, n): S-factor 1 11B(α, n): S-factor for thick-target 400 - 500 keV 1 11B(α, n): S-factor for thin-target 1 1966MA04, Errata 11B(α, n): excitation curve < 4.5 for

  11. 11C Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C(p, X) (Current as of 03/01/2016) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2013SO11 11C(p, γ): deduced astrophysical reaction rates and S-factors X4 12/14/2015 2003LI51 11C(p, γ): deduced S-factor low X4 09/12/2011 2003TA02 11C(p, γ): deduced S-factor 0 - 0.7 X4 09/12/2011 2003KU36 11C(p, p): elastic scattering σ ~ 0.2 - 3.2 θcm = 180° 09/08/2011 Back to (p, X) Main Page Back to (α, X) Main Page Back to Datacomp Home Page Last modified: 02 March

  12. 13C Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 02/08/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2006JO11 13C(α, n): deduced S(E) ~ 0 - 1 from (1993BR17), from (1993DR08) X4 08/04/2011 2001HE22 13C(α, n): S(E) 0 - 2 S-factor 11/15/2011 2003KA51 13C(α, n): deduced S-factors, reaction rate Ecm ~ 200 - 800 keV X4 05/01/2012 1993DR08 13C(α, n): excitation function and S(E) ~ 275 - 1075 keV σ, S-factor X4 08/04/2011 2008HE11 13C(α, n): σ, reaction yields and S(E) Ecm = 320 - 700 keV σ, Table

  13. 14N Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 05/14/2012) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1971CO27 14N(α, γ): thick target yield 0.5 - 1.2 1 08/04/2011 2000GO43 14N(α, γ): resonance yields, deduced astrophysical reaction rates 550 - 1300 keV X4 03/01/2012 1973RO03 14N(α, γ): γ-ray yield 1.0 - 3.2 1 04/30/2012 1980MA26 14N(α, α): σ 1.5, 1.6 X4 03/01/2012 2007CH25 14N(α, γ): deduced resonance parameters 1620 - 1775 keV X4 03/01/2012 1994YE11 14N(α, α): σ(θ)/σ(Rutherford) 2

  14. 18O Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 05/14/2012) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2003DA19 18O(α, γ): deduced resonance strengths ~ 470 - 770 keV X4 02/13/2012 1978TR05 18O(α, γ): excitation function for the 1.27 MeV secondary γ-ray transition 0.6 - 2.3 θγ = 0° 02/29/2012 1990VO06 18O(α, γ): resonance γ yields < 0.78 X4 02/13/2012 1973BA10 18O(α, n): σ with target thickness 1 - 5 6 keV, 13 keV 06/06/2011 1956BO61 18O(α, n): neutron yields 1.8 - 5.3 0° - 30° X4

  15. 19F Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 02/08/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2008UG01 19F(α, p): yield curves, σ 792 - 1993 keV X4 09/14/2011 2005UG04 19F(α, p1γ): excitation curve 1238 - 2009 keV 1 11/30/2011 19F(α, p0): excitation curve 1 19F(α, p1): excitation curve 1 1984CS01 19F(α, α): σ 1.5 - 3.7 X4 09/14/2011 1994CH36 19F(α, α): σ 1.5 - 4.5 X4 09/14/2011 2000WR01 19F(α, n): neutron yields and σ 2.28 - 3.10 X4 09/14/2011 1977VA10 19F(α, n): differential

  16. 6Li Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 02/01/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1985NE05 6Li(α, γ): γ thick target yield resonance X4 02/15/2012 1966FO05 6Li(α, γ): σ 0.9 - 3.0 2 < Eγ < 4 MeV, 4 < Eγ < 7 MeV, thick target capture γ-ray yield, capture γ-ray yield of 2.43 MeV resonance 02/29/2012 1989BA24 6Li(α, γ): σ 1.085, 1.175 X4 02/15/2012 1979SP01 6Li(α, γ): thick target yield curve for 718 keV γ-rays 1140 - 1250 keV 1175 keV resonance 07/19/2011

  17. 9Be Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 01/21/2015) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1994WR01 9Be(α, n): σ, thick target yield, deduced S-factor Ecm = 0.16 - 1.87 S(E) X4 01/24/2012 2011GI05 9Be(α, nγ): σ for n1 0.3 - 7.9 linear scale, log scale 06/18/2012 1968DA05 9Be(α, n): excitation function at θ = 0° 0.34 - 0.68 n0, n1 X4 07/19/2011 1994HA32 9Be(α, n): excitation function 480- 740 keV 1 01/24/2012 1994LE18 9Be(α, α): σ at θ = 170.5° 0.5- 3 X4 01/11/2012 1996KU07

  18. SECTION M_Evaluation Factors

    National Nuclear Security Administration (NNSA)

    value analysis described in this Section M. (b) The instructions set forth in Section L are designed to provide guidance to the Offeror concerning documentation that will be...

  19. PART III-SECTION J

    National Nuclear Security Administration (NNSA)

    C SECTION J APPENDIX C TRANSITION PLAN Plan: To be inserted by the Contracting Officer. Requirements: In accordance with Section F, Deliverables During Transition, the Contractor...

  20. SECTION J, APPENDIX B - PEP

    National Nuclear Security Administration (NNSA)

    SECTION J APPENDIX B PERFORMANCE EVALUATION PLAN Replaced by Mods 002, 016, 020, 029, 0084 Intentionally left blank for Internet posting purposes. Section J, Appendix B, Page 1...

  1. SECTION J, APPENDIX B - PEP

    National Nuclear Security Administration (NNSA)

    SECTION J APPENDIX B PERFORMANCE EVALUATION PLAN Replaced by Mods 002, 016, 020, 029, 0084 Intentionally left blank for Internet posting purposes. Section J, Appendix B, Page 1

  2. Navy's Section 2922a Legislation Success Stories

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—features U.S. Department of Navy success stories in relation to Section 2922a legislation, which involves contracts for energy or fuel for military installations.

  3. 12C Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 05/14/2012) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2009MA70 12C(α, γ0): σ 0 - 2.27 X4 05/01/2012 2012OU01 12C(α, γ): deduced S-factor Ecm = 0.3 - 3.5 X4 02/12/2015 1997KU18 12C(α, γ): analyzed S-factor Ecm = 0.9 - 3 X4 05/10/2012 1987RE02 12C(α, γ): σ, deduced S-factor 0.94 - 2.84 X4 05/09/2012 2001HA31 12C(α, γ): deduced S-factors Ecm = 0.95 - 2.78 E1, E2 06/18/2012 2001KU09 12C(α, γ): deduced S-factor Ecm = 0.95 - 2.8 X4 05/09/2012

  4. 14C Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C(p, X) (Incomplete) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1969SI04 14C(p, γ): γ-rays yield for 230 - 690 keV Eγ ≥ 2.8 MeV 08/15/2013 1990GO25 14C(p, γ): σ, deduced S-factor 250 - 740 keV X4 10/28/2014 1968HE12 14C(p, γ): γ-ray yield 0.6 - 2.7 γ0 01/06/2015 1991WA02 14C(p, n): σ 1.0 - 1.55 X4 10/28/2014 1968HA27 14C(p, p): σ at θcm = 1.0 - 2.7 39.2°, 54.7°, 90°, 125.3°, 161.4° 08/15/2013 1971KU01 14C(p, γ0): excitation function at θ = 90° 1.3 - 2.6 1

  5. 15N Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 05/14/2012) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2002WI18 15N(α γ): σ 461 - 2642 keV X4 09/12/2011 1997WI12 15N(α γ): σ 0.65 - 2.65 X4 09/12/2011 1995WI26 15N(α γ): σ 0.67 - 0.69 X4 09/12/2011 1969AI01 15N(α γ): γ-ray excitation curve for 3.0 ≤ Eγ ≤ 7.0 MeV 2.5 - 3.2 1 11/30/2011 1977DI08 15N(α, γ): γ-ray excitation curve near Eα = 3.15 MeV for transitions to 3146 - 3158 keV five low-lying states, 4.65 MeV (13/2+) state

  6. 16O Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6O(α, X) (Current as of 02/08/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1971TO06 16O(α, γ): σ 0.85 - 1.8 X4 09/15/2011 1953CA44 16O(α, α): σ 0.94 - 4.0 X4 09/15/2011 1997KU18 16O(α, γ): analyzed S-factor 1 - 3.25 X4 05/10/2012 1980MA27 16O(α, α): σ 1.305 - 1.330; 2.950 - 3.075 X4 02/14/2012 16O(α, γ): σ 1.37, 2.6, 2.9, 3.036 1987HA24 16O(α, γ): σ Ecm = 1.7 - 2.35 X4 02/14/2012 1990LE06 16O(α, α): σ 1.8 - 5 X4 03/12/2011 1985JA17 16O(α, α): σ 2

  7. 17O Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 02/08/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2013BE11; see also 2012BEZP 17O(α, n), (α, γ): σ, S-factors 0.8 - 2.3 X4 02/12/2015 1973BA10 17O(α, n): neutron yields with target thickness 0.9 - 5.3 ~ 2.5 keV, 6 keV, 13 keV, ~ 35 keV 06/06/2011 1976MC12 17O(α, n1): yield of 1.63-MeV γ's 1.4 - 2.3 θγ = 50° 04/28/2011 17O(α, n0): yield of neutrons θn = 120° 17O(α, n1): yield of 1.63-MeV γ's 1.825 - 1.885 θγ = 0° 05/03/2011 17O(α,

  8. 3H Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3H(α, X) (Current as of 02/01/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2001TO07 3H(α, γ): deduced S-factor Ecm = 0.05 - 0.8 X4 01/09/2012 1994BR25 3H(α, γ): deduced σ and S-factor Ecm = 50 - 1200 keV X4 01/09/2012 1987SC18 3H(α, γ): σ, deduced S-factor Ecm = 79 - 464 keV X4 01/09/2012 1988SA13 3H(α, α): recoil σ 0.5 - 2.5 X4 01/09/2012 1987BU18 3H(α, γ): σ and S-factor 0.7 - 2 X4 01/09/2012 1968IV01 3H(α, α): elastic scattering σ 3 - 11 Table 9 X4

  9. 3He Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 03/01/2016) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1980BE06 3He(pol. p, p): σ 0.3 - 1.0 X4 10/30/2014 1964IM03 3He(p, γ): deduced σ limit for -0.6 < Q < +4.0 MeV 0.5 - 2.6 X4 10/30/2014 1966DR03 3He(p, p): σ 2.38 - 4.46 X4 10/30/2014 1974SO06 3He(p, X): total reaction σ 18 - 48 1 03/07/2011 1976SO01 3He(p, X): total reaction σ 18 - 48 1 X4 03/08/2011 2007SH39 3He(pol. p, π+): differential σ 200, 300, 400 X4 10/30/2014 1985EP01 3He(p,

  10. 3He Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 05/14/2012) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1982KR05 3He(α, γ): σ Ecm = 107 - 1266 keV X4 01/05/2012 1969NA24 3He(α, γ): σ and S-factor 164 - 245 keV σ, S(E) X4 07/19/2011 1984OS03 3He(α, γ): σ 165 - 1169 keV X4 01/05/2012 1982OS02 3He(α, γ): S-factor 165 - 1170 keV S34(Ecm) X4 07/19/2011 1988HI06 3He(α, γ): σ Ecm = 195 - 686 keV X4 01/05/2012 2007CO17 3He(α, γ): deduced σ and S-factor 220, 250, 400 keV X4 01/05/2012

  11. 4He Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 03/01/2016) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1974KR07 4He(p, p): σ 0.5 - 3 X4 10/23/2014 2004PU02 4He(p, p): σ(θ = 128.7°) 1.2 - 5.2 X4 10/23/2014 1997NU02 4He(p, p): σ 1.4 - 6 X4 10/23/2014 1976BR17 4He(p, p): σ(168.8°)/σ(104.4°) 2.24 - 5.90 X4 10/23/2014 1977DO01 4He(p, p): σ 11 - 14 X4 10/23/2014 1969GA12 4He(p, p): σ 12.04, 14.23, 17.45 X4 10/23/2014 1974SO06 4He(p, X): total reaction σ 18 - 48 1 03/08/2011 1976SO01 4He(p, X),

  12. 20Ne Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    20Ne(α, X) (Current as of 02/08/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1983SC17 20Ne(α, γ): deduced S-factor of capture σ 0.55 - 3.2 X4 09/15/2011 1997WI12 20Ne(α, γ): deduced primary transitions yield 1.64 - 2.65 X4 09/15/2011 1999KO34 20Ne(α, γ): γ-ray yield for the transition 1.9 - 2.8 g.s. 01/03/2012 1369 keV g.s. 10917 keV g.s., 1369 keV 11016 keV g.s. 1975KU06 20Ne(α, γ): σ 2.5 - 20 X4 09/15/2011 1968HI02 20Ne(α, γ): σ 3 - 6 X4 09/15/2011

  13. Interagency ADR Workplace Section Education Programs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Conflict Prevention and Resolution » Interagency ADR Workplace Section Education Programs Interagency ADR Workplace Section Education Programs The Secretary of Energy expresses support of alternative dispute resolution (ADR) and the DOE annual celebration of Conflict Resolution Day held on the third Thursday of October. The Interagency Alternative Dispute Resolution Working Group (IADRWG) Workplace Conflict Management Section ("Workplace Section") provides guidance on

  14. Neutrino Cross-Section Experiments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technology - Chicago David Schmitz, Fermilab Outline Quick Audience Survey Introduction Relevant Energies and Targets Current Cross-Section Experiments Recent...

  15. Section L, Paragraph L-4

    National Nuclear Security Administration (NNSA)

    D SECTION L ATTACHMENT D CROSS REFERENCE MATRIX Section L Section M Offeror's Proposal Criterion 1: PAST PERFORMANCE L-15 (a) M-3 (a) Criterion 2: SITE ORGANIZATION AND QUALIFICATIONS OF KEY PERSONNEL L-15 (b)(1) M-3 (b)(1) L-15 (b)(2) M-3 (b)(2) Criterion 3: SMALL BUSINESS PARTICIPATION L-15 (c) M-3 (c)

  16. PART III-SECTION J

    National Nuclear Security Administration (NNSA)

    C SECTION J APPENDIX C TRANSITION PLAN Plan: [To be inserted by the Contracting Officer.] Requirements: In accordance with Section F, Deliverables During Transition, the Contractor shall submit a Transition Plan for the Contracting Officer's approval 10 days after Contract award. The Transition plan shall describe the process, details, schedule, and cost for providing an orderly transition during the Contract's Transition Term stated in Section F, F-3 Period of Performance. The Transition Plan

  17. Experimental Cross Section Data Selection by a SAMMY Parameterization:

    Office of Scientific and Technical Information (OSTI)

    9Be({alpha}, n) Cross Section Evaluation up to 4 MeV (Journal Article) | SciTech Connect Experimental Cross Section Data Selection by a SAMMY Parameterization: 9Be({alpha}, n) Cross Section Evaluation up to 4 MeV Citation Details In-Document Search Title: Experimental Cross Section Data Selection by a SAMMY Parameterization: 9Be({alpha}, n) Cross Section Evaluation up to 4 MeV This paper reports an evaluation work on the resolved resonance parameters of the {alpha} + 9Be reaction from 0 to 4

  18. PART III … SECTION J

    National Nuclear Security Administration (NNSA)

    B, Page 1 SECTION J APPENDIX B AWARD FEE PLAN [Note: To be inserted by the Contracting Officer after contract award.]

  19. PART III … SECTION J

    National Nuclear Security Administration (NNSA)

    M, Page 1 SECTION J APPENDIX M CONTRACTOR COMMITMENTS, AGREEMENTS, AND UNDERSTANDINGS [Note: To be inserted by the Contracting Officer after contract award.]

  20. Microsoft Word - Contract Sections B-H.DOC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Section F Page F-2 F.1 Period of Performance The period of performance (exclusive of the Transition Period) for the work specified in Section C, Statement of Work, of this Contract shall commence on March 8, 2004 and continue through September 30, 2006, unless terminated sooner as provided for in other provisions of this contract. The Transition Period shall commence when a written Notice-to-Proceed is issued by the Contracting Officer. The Transition Period shall continue through March 7,

  1. OSCARS Collaborative Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OSCARS Collaborative Work Engineering Services The Network OSCARS How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers...

  2. SECTION THIRTY SEVEN Consultants Section Thirty Seven Consultants, Inc.

    Broader source: Energy.gov (indexed) [DOE]

    SECTION THIRTY SEVEN Consultants Section Thirty Seven Consultants, Inc. A California Corporation 1 DEPARTMENT OF ENERGY [OE Docket No. RRTT-IR-001] Rapid Response Team for Transmission AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy, DoE. ACTION: Request for information. (1) The development timelines for generation and attendant transmission are often not coordinated or run concurrently. Because of the lengthy time to obtain regulatory reviews, permits and

  3. DOE_PPPL_Section E_M007

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E M007 i PART I SECTION E INSPECTION AND ACCEPTANCE PAGE NO. E.1 - FAR 52.246-9 - INSPECTION OF RESEARCH AND DEVELOPMENT (SHORT FORM) (APR 1984) E-1 E.2 - APPLICABLE ONLY TO THE RECOVERY ACT WORK E-1 Contract No. DE-AC02-09CH11466 Section E M007 E-1 PART I SECTION E - INSPECTION AND ACCEPTANCE E.1 - FAR 52.246-9 - INSPECTION OF RESEARCH AND DEVELOPMENT (SHORT FORM) (APR 1984) The Government has the right to inspect and evaluate the work performed or being performed under the contract, and the

  4. SECTION M_Evaluation Factors

    National Nuclear Security Administration (NNSA)

    SECTION M EVALUATION FACTORS FOR AWARD TABLE OF CONTENTS M-1 EVALUATION OF PROPOSALS .....................................................................................2 M-2 BASIS FOR CONTRACT AWARD ...................................................................................3 M-3 TECHNICAL AND MANAGEMENT CRITERIA ..........................................................3 M-4 COST CRITERION

  5. SECTION M_Evaluation Factors

    National Nuclear Security Administration (NNSA)

    ... statement, if applicable, from the Offeror of any past, present, or currently planned financial, contractual, organizational, or other interests relating to the statement of work. ...

  6. Service and Repair Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Service and Repair Work Whenever on-site service or repair work needs to be done, a Procurement Work Sheet (PWS) must be completed, and possibly an IWS, authorized and released. PWS is required for service work even if there are no apparent hazards. PWS is required for work in Jupiter Laser Facility even if you have a PWS for service/repairs in another location. To complete a PWS for service work in Jupiter Laser Facility, please contact Sean Holte (2-3905, pager #05312). Notify Brent Stuart and

  7. River Corridor Closure Contract Section J, Attachment J-14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Contract No. DE-AC06-08RL14655 A099 1 SECTION J, ATTACHMENT J-14 ACRONYM LIST The following acronyms are used in this Contract: AB Authorization Basis ACO Administrative Contracting Officer ACWP Actual Cost of Work Performed ADR Alternative Dispute Resolution ARRA American Recovery and Reinvestment Act B&R Budgeting and Reporting BCWP Budgeted Cost of Work Performed BCWS Budgeted Cost of Work Scheduled BHI Bechtel Hanford, Inc. BMS Business Management System BRC Budget and Reporting

  8. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal...

  9. Administering Work Force Discipline

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-05-14

    The order provides requirements and responsibilities for administering work force discipline and corrective actions. Supersedes DOE O 3750.1.

  10. Interagency Sustainability Working Group

    Broader source: Energy.gov [DOE]

    The Interagency Sustainability Working Group (ISWG) is the coordinating body for sustainable buildings in the federal government.

  11. Transition section for acoustic waveguides

    DOE Patents [OSTI]

    Karplus, H.H.B.

    1975-10-28

    A means of facilitating the transmission of acoustic waves with minimal reflection between two regions having different specific acoustic impedances is described comprising a region exhibiting a constant product of cross-sectional area and specific acoustic impedance at each cross-sectional plane along the axis of the transition region. A variety of structures that exhibit this feature is disclosed, the preferred embodiment comprising a nested structure of doubly reentrant cones. This structure is useful for monitoring the operation of nuclear reactors in which random acoustic signals are generated in the course of operation.

  12. Section H: Special Contract Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    H SPECIAL CONTRACT REQUIREMENTS Request for Proposal # DE-RP36-07GO97036 PART I SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 No Third Party Beneficiaries.............................................................................................1 H.2 Workforce Transition ........................................................................................................1 H.3 Employee Compensation: Pay and

  13. SECTION M_Evaluation Factors

    National Nuclear Security Administration (NNSA)

    TABLE OF CONTENTS M-1 EVALUATION OF PROPOSALS......................................................................176 M-2 BASIS FOR CONTRACT AWARD...................................................................177 M-3 TECHNICAL AND MANAGEMENT CRITERIA..........................................177 M-4 COST CRITERION.............................................................................................179 Section M, Page 176 M-1 EVALUATION OF PROPOSALS (a) This acquisition will be

  14. Request for Proposal No. DE-SOL-XXXXXX Section J, Appendix A, Page i

    National Nuclear Security Administration (NNSA)

    XXXXXX Section J, Appendix A, Page i SECTION J, APPENDIX A: STATEMENT OF WORK TABLE OF CONTENTS CHAPTER I. OBJECTIVES, SCOPE, AND REQUIREMENTS ......................................................................... 1 1.0 OBJECTIVE .................................................................................................................................................. 1 2.0 BACKGROUND

  15. ORISE: Work Smart Standards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Code Ann. 68-21-101 et seq. Tennessee Boiler Inspection Act, Tenn. Code Ann 68 ... Publications - Section VIII Pressure Vessel Code City of Oak Ridge Code of Ordinances, ...

  16. Transverse section radionuclide scanning system

    DOE Patents [OSTI]

    Kuhl, David E.; Edwards, Roy Q.

    1976-01-01

    This invention provides a transverse section radionuclide scanning system for high-sensitivity quantification of brain radioactivity in cross-section picture format in order to permit accurate assessment of regional brain function localized in three-dimensions. High sensitivity crucially depends on overcoming the heretofore known raster type scanning, which requires back and forth detector movement involving dead-time or partial enclosure of the scan field. Accordingly, this invention provides a detector array having no back and forth movement by interlaced detectors that enclose the scan field and rotate as an integral unit around one axis of rotation in a slip ring that continuously transmits the detector data by means of laser emitting diodes, with the advantages that increased amounts of data can be continuously collected, processed and displayed with increased sensitivity according to a suitable computer program.

  17. ORISE: Working with ORISE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oak Ridge Institute for Science Education Working with ORISE If you are interested in learning about how your agency can utilize the capabilities of the Oak Ridge Institute for Science and Education (ORISE) through a Work for Others agreement or a procurement contract, or if you are looking for career opportunities, the following information provides an explanation of how to work with ORISE. If you do not see an option that applies to your needs, please contact ORISE General Information.

  18. Mission Support Contract Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC06-09RL14728 Modification 298 1 ATTACHMENT J-4-d Mission Support Contract FY 2013 Performance Evaluation and Measurement Plan The Performance Evaluation and Measurement Plan (PEMP) details the administration of performance incentives and allocation of total available fee as defined in Section B, Supplies or Services and Prices/Costs. 1. PERFORMANCE INCENTIVES This PEMP contains both objective and subjective performance incentives in order to maximize the efficacy of the

  19. PART III … SECTION J

    National Nuclear Security Administration (NNSA)

    Request for Proposal No. DE-SOL-0008418 Section J Appendix F List of Applicable Laws, Regulations, and DOE Directives In addition to the list of applicable directives referenced below, the Contractor shall also comply with supplementary directives (e.g., manuals), which are invoked by a Contractor Requirements Document (CRD) attached to a directive referenced below. This List excludes directives that have been granted an exemption from the CRD in whole or in part. For those Directives whereby

  20. Clean Air Act, Section 309

    Office of Environmental Management (EM)

    CLEAN AIR ACT § 309* §7609. Policy review (a) The Administrator shall review and comment in writing on the environmental impact of any matter relating to duties and responsibilities granted pursuant to this chapter or other provisions of the authority of Administrator, contained in any (1) legislation proposed by any Federal department or agency, (2) newly authorized Federal projects for construction and any major Federal agency action (other than a project for construction) to which section

  1. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal process or may be completed as an independent document. In the ESS, identify each material (including all biological materials) with which you will be working. The regulatory oversight for biological work is very complicated and we need to understand the risk levels involved with the material you plan to use at the ALS,

  2. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal process or may be completed as an independent document. In the ESS, identify each material (including all biological materials) with which you will be working. The regulatory oversight for biological work is very complicated and we need to understand the risk levels involved with the material you plan to use at the ALS,

  3. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cells, viruses), plant or soil samples (USDA quarantines), recombinant DNA, or blood-borne pathogen. Biological Use Authorization The great majority of biological work at...

  4. INL @ work: Archaeologist

    ScienceCinema (OSTI)

    Lowrey, Dino

    2013-05-28

    INL @ work features jobs performed at the lab. For more information about INL careers, visit http://www.facebook.com/idahonationallaboratory.

  5. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for proper development and review time. Training All resident LBNL users (those whose work authorization includes a JHA) must take the standard LBNL training courses for...

  6. Photoelectrochemical Working Group

    Broader source: Energy.gov [DOE]

    The Photoelectrochemical Working Group meets regularly to review technical progress, develop synergies, and collaboratively develop common tools and processes for photoelectrochemical (PEC) water...

  7. ADVANCED HOT SECTION MATERIALS AND COATINGS TEST RIG

    SciTech Connect (OSTI)

    Scott Reome; Dan Davies

    2004-01-01

    The Hyperbaric Advanced Hot Section Materials & Coating Test Rig program initiated this quarter, provides design and implementation of a laboratory rig capable of simulating the hot gas path conditions of coal-gas fired industrial gas turbine engines. The principle activity during this first reporting period were preparing for and conducting a project kick-off meeting, working through plans for the project implementation, and beginning the conceptual design of the test section.

  8. Estimation of Anisotoropy from Total Cross Section and Optical Model

    Office of Scientific and Technical Information (OSTI)

    (Conference) | SciTech Connect Estimation of Anisotoropy from Total Cross Section and Optical Model Citation Details In-Document Search Title: Estimation of Anisotoropy from Total Cross Section and Optical Model Authors: Kawano, Toshihiko [1] + Show Author Affiliations Los Alamos National Laboratory Publication Date: 2013-06-03 OSTI Identifier: 1082234 Report Number(s): LA-UR-13-24025 DOE Contract Number: AC52-06NA25396 Resource Type: Conference Resource Relation: Conference: Working Party

  9. Microsoft Word - RL14788-Section_F_197.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Contract No. DE-AC06-08RL14788 Modification 197 F-i PART I - THE SCHEDULE SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS F.1 PERIOD OF PERFORMANCE .................................................................................... F-1 F.2 PRINCIPAL PLACE OF PERFORMANCE .................................................................. F-1 F.3 FAR 52.242-15, STOP-WORK ORDER (AUG 1989) -- ALTERNATE I (APR 1984) .... F-1 Plateau Remediation Contract Section F Contract No.

  10. Macro-Industrial Working Group 2

    Gasoline and Diesel Fuel Update (EIA)

    2 Macro-Industrial Working Group Macroeconomic Analysis Team: Kay Smith, Team Leader, Elizabeth Sendich, Russ Tarver, and Vipin Aurora September 11, 2012 | Washington, DC Macro section WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Overview Macroeconomic Team, Washington, DC, Sept. 11, 2012 2 * The overall macroeconomic outlook * The detailed industrial production outlook * Summary employment and commercial floor space outlook *

  11. WM Committee FY'16 Work Plan

    Office of Environmental Management (EM)

    Committee FY'16 Work Plan Approved at the March 9, 2016 Combined Committee Meeting 1 Northern New Mexico Citizens' Advisory Board (NNMCAB) WASTE MANAGEMENT COMMITTEE 2016 Work Plan SECTION I. MISSION STATEMENT The Northern New Mexico Citizens' Advisory Board (NNMCAB) Waste Management (WM) Committee reviews policies, practices and procedures, existing and proposed to provide recommendations, advice, suggestions and opinions to the US Department of Energy (DOE), regarding the waste management

  12. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-04-20

    It establishes a work authorization and control process for work performed by designated management and operating (M&O), management and integrating (M&I), environmental restoration management contracts (ERMC) and other contracts determined by the Procurement Executive (hereafter referred to as M&O contractors). Cancels DOE O 5700.7C. Canceled by DOE O 412.1A.

  13. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-04-21

    To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. Cancels DOE O 412.1.

  14. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-04-21

    To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A.

  15. Contract Number DE-EM0003383, Mod 010 Section B Workers' ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Government), and services to perform in an efficient and effective manner, all work set forth in Section C, Statement of Work (SOW). B.2 OBLIGATION OF FUNDS AND LIMITATION OF...

  16. Microsoft Word - Contract Sections B-H.DOC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Page D-1 Section D Packaging and Marking Table of Contents Section Page D.1 Packaging D-2 D.2 Marking D-2 Occupational Health Services Part I Contract No. DE-AC06-04RL14383 Section D Page D-2 D.1 Packaging Preservation, packaging, and packing for shipment or mailing of all work delivered under this Contract shall be in accordance with good commercial practices and adequate to ensure acceptance by common carrier and safe transportation. D.2 Marking Each package, report or other deliverable

  17. Turbine airfoil having outboard and inboard sections

    DOE Patents [OSTI]

    Mazzola, Stefan; Marra, John J

    2015-03-17

    A turbine airfoil usable in a turbine engine and formed from at least an outboard section and an inboard section such that an inner end of the outboard section is attached to an outer end of the inboard section. The outboard section may be configured to provide a tip having adequate thickness and may extend radially inward from the tip with a generally constant cross-sectional area. The inboard section may be configured with a tapered cross-sectional area to support the outboard section.

  18. Trails Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Trails » Trails Working Group Trails Working Group Our mission is to inventory, map, and prepare historical reports on the many trails used at LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The LANL Trails Working Group inventories, maps, and prepares historical reports on the many trails used at LANL. Some of these trails are ancient pueblo footpaths that continue to be used for recreational hiking today. Some

  19. How It Works

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How It Works Engineering Services The Network OSCARS How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers Community Read More... Fasterdata IPv6 Network Network Performance Tools The ESnet Engineering Team Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net How It Works

  20. Work/Life Balance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Workplace » Work/Life Balance /careers/_assets/images/careers-icon.jpg Work/Life Balance Explore the multiple dimensions of a career at Los Alamos Lab: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. What our employees say: Health & Wellness "The Lab pays 80 percent of my family's medical premiums with Blue Cross Blue Shield of New Mexico." Retirement & Savings "With the Lab matching my

  1. Clean Energy Works

    Broader source: Energy.gov [DOE]

    Through Clean Energy Works, homeowners can finance up to $30,000 at a fixed interest rate for home energy efficiency retrofits for a variety of measures. Customers have varying lender and loan op...

  2. Working Group Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Group Reports Special Working Session on the Role of Buoy Observations in the Tropical Western Pacific Measurement Scheme J. Downing Marine Sciences Laboratory Sequim, Washington R. M. Reynolds Brookhaven National Laboratory Upton, New York Attending W. Clements (TWPPO) F. Barnes (TWPPO) T. Ackerman (TWP Site Scientist) M. Ivey (ARCS Manager) H. Church J. Curry J. del Corral B. DeRoos S. Kinne J. Mather J. Michalsky M. Miller P. Minnett B. Porch J. Sheaffer P. Webster M. Wesely K.

  3. Macro Industrial Working Group

    Gasoline and Diesel Fuel Update (EIA)

    September 29, 2014 | Washington, DC WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Industrial team preliminary results for AEO2015 Overview AEO2015 2 Industrial Team Washington DC, September 29, 2014 WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE * AEO2015 is a "Lite" year - New ethane/propane pricing model only major update - Major side cases released with Reference case

  4. Partnerships & Sponsored Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Partnerships & Sponsored Work Partnerships & Sponsored Work Los Alamos scientists and engineers conduct basic research across a wide range of scientific areas to support our national security mission. Many of the technologies, processes, and special technical expertise we have developed has been applied to solving problems in the private sector through mutually beneficial, technology partnerships. Contact Cooperative Research & Development Agreements (CRADA) CRADA Team Email

  5. Working With Us | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working With Us Join us in building a clean energy future. NREL offers many opportunities to industry, organizations, government, researchers, businesses, students, educators, and vendors. At NREL, we work with organizations large and small through research partnerships, licensing of NREL technologies, support for cleantech stakeholders, and fostering the clean energy economy. Join us to accelerate the movement of renewable energy and energy-efficient solutions into practical applications.

  6. Fermilab: Science at Work

    ScienceCinema (OSTI)

    Brendan Casey; Herman White; Craig Hogan; Denton Morris; Mary Convery; Bonnie Fleming; Deborah Harris; Dave Schmitz; Brenna Flaugher; Aron Soha

    2013-02-14

    Six days. Three frontiers. One amazing lab. From 2010 to 2012, a film crew followed a group of scientists at the Department of Energy's Fermilab and filmed them at work and at home. This 40-minute documentary shows the diversity of the people, research and work at Fermilab. Viewers catch a true behind-the-scenes look of the United States' premier particle physics laboratory while scientists explain why their research is important to them and the world.

  7. Part IV: Section D - Packaging and Marking

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PART I SECTION D PACKAGING AND MARKING DE-AC36-08GO28308 Modification M901 Section D - Page ii PART I SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 Packaging 1 D.2 Marking...

  8. OpenEI Community - Section 7

    Open Energy Info (EERE)

    http:en.openei.orgcommunityblogidaho-meeting-2comments endangered species Fauna Fish and Wildlife Flora FWS Section 12 Section 7 Geothermal Regulatory Roadmap Wed, 05 Sep...

  9. Section 999 Program Library | Department of Energy

    Office of Environmental Management (EM)

    Offshore Drilling Section 999 Program Library Section 999 Program Library Cost-Shared Program Publications October 2, 2013 UDAC Meeting - October 2013 October 2, 2013 URTAC ...

  10. Vermont Section 401 Water Quality Certification Application ...

    Open Energy Info (EERE)

    Abstract Application required for Section 401 water quality certification under the Clean Water Act. Form Type ApplicationNotice Form Topic Section 401 Water Quality...

  11. SECTION L … ATTACHMENT xx … KEY PERSONNEL AND CRITICAL WORK...

    National Nuclear Security Administration (NNSA)

    Include any experience with international projects. 2. Describe the Implementation and Sustainability Program Manager's program management and leadership experience, including the ...

  12. DE-SOL-0008418 Section J, Appendix A, Statement of Work

    National Nuclear Security Administration (NNSA)

    17 4.0 DEFENSE NUCLEAR NONP-PROLIFERATION REQUIREMENTS ......material, and detect and control the proliferation of related weapons of mass destruction ...

  13. DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... via transfer to a Federal Records Center (FRC, destruction, or transfer to another DOE ... commercial andor the FRC) and the destruction process (e.g., review process, etc.). ...

  14. DE-SOL-0008418 Section J, Appendix A, Statement of Work

    National Nuclear Security Administration (NNSA)

    22 7.0 OFFICE OF DEFENSE NUCLEAR SECURITY REQUIREMENTS ... 22 8.2 Waste ManagementEnergy Efficiency ... Contracting Officer: (i) A clean copy of the current plan ...

  15. DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    mission of the WIPP and the National Transuranic Waste Program is to protect human health and the environment by safe management, retrieval, characterization,...

  16. DE-SOL-0008418 Section J, Appendix A, Statement of Work

    National Nuclear Security Administration (NNSA)

    6 2.1 Programs ............................................................................................................................................... 16 2.2 DOE and NNSA Strategic Planning Process ......................................................................................... 16 2.3 Technology and Business Integration .................................................................................................... 16 2.4 Site Directed Research, Development and Demonstration

  17. DE-SOL-0008418 Section J, Appendix A, Statement of Work

    National Nuclear Security Administration (NNSA)

    5 2.1 Programs ............................................................................................................................................... 15 2.2 DOE and NNSA Strategic Planning Process ......................................................................................... 16 2.3 Technology and Business Integration .................................................................................................... 16 2.4 Site Directed Research, Development and Demonstration

  18. New work on updating and extending the nuclear data standards

    SciTech Connect (OSTI)

    Carlson, A.D.; Pronyaev, V.G.; Capote, R.; Hambsch, F.J.; Kaeppeler, F.; Lederer, C.; Mannhart, W.; Mengoni, A.; Nelson, R. O.; Schillebeeckx, P.; Talou, P.; Tagesen, S.; Vonach, H.; Vorobyev, A.; Wallner, A.

    2011-07-01

    An International Atomic Energy Agency (IAEA) Data Development Project was initiated to provide a mechanism for allowing new experimental data and improvements in evaluation procedures to be incorporated into new evaluations of the standards. The work on this project is ongoing. In the past very long periods sometimes occurred between evaluations of the standards. Through the use of this Project, such long periods should not occur. Work on the cross section standards through this Project has included an update of the experimental data to be used in the cross section standards evaluations, a study of the uncertainties obtained in the international standards evaluation, and improvements in the smoothing procedure for capture cross sections. It was decided that this Project should have a broader range of activities than just the cross section standards and thus encompass standards related activities. The following are being investigated: improvements in the gold cross section at energies below where it is considered a standard and work on certain cross sections that are not as well known as the cross section standards but could be very useful as reference cross sections relative to which certain types of cross section measurements can be made. This work includes prompt gamma-ray production in fast neutron-induced reactions, and work on the {sup 252}Cf spontaneous fission neutron spectrum and the {sup 235}U thermal neutron fission spectrum. Most of the data investigated through this Project are used in dosimetry applications. (authors)

  19. Work Force Retention Work Group Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Force Retention Work Group Charter Work Force Retention Work Group Charter The Work force Retention Work Group is established to support the Department's critical focus on maintaining a high-performing work force at a time when a significant number of the workers needed to support DOE's national security mission are reaching retirement age. PDF icon Work Force Retention Work Group Charter More Documents & Publications Workforce Retention Work Group Status Overview - September 2012 Training

  20. C+C Fusion Cross Sections Measurements for Nuclear Astrophysics

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Almaraz-Calderon, S.; Carnelli, P. F. F.; Rehm, K. E.; Albers, M.; Alcorta, M.; Bertone, P. F.; Digiovine, B.; Esbensen, H.; Fernandez Niello, J. O.; Henderson, D.; et al

    2015-06-02

    Total fusion cross section of carbon isotopes were obtained using the newly developed MUSIC detector. MUSIC is a highly efficient, active target-detector system designed to measure fusion excitation functions with radioactive beams. The present measurements are relevant for understanding x-ray superbursts. The results of the first MUSIC campaign as well as the astrophysical implications are presented in this work.

  1. ORISE Contract, PART I - SCHEDULE, Section F Deliveries or Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F DELIVERIES OR PERFORMANCE F.1 52.242-15 STOP-WORK ORDER (AUG 1989) - ALTERNATE I (APR 1984) ................... 3 F.2 TERM OF CONTRACT (NOV 2004) ...................................................................................... 4 F.3 PLACE OF PERFORMANCE (NOV 2004)............................................................................ 4 F.4 TRANSITION ACTIVITIES (JUL 2005) ................................................................................ 4 Section F - Page 1 of 4

  2. Exhibit G / working draft

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Off-site (Rev 5, 2/28/2014) P.R. No. * Date * Page 1 of 2 Subcontract No. or PO No. * EXHIBIT G OFF-SITE SECURITY REQUIREMENTS G1.0 Definitions and Acronyms (Feb 2014) Definitions and acronyms may be accessed electronically at http://www.lanl.gov/resources/_assets/docs/Exhibit-G/exhibit-g-definitions-acronyms-green.pdf G2.0 Statements Applicable To Scope of Work (July 2013) CONTRACTOR believes that all of the statements listed below are factually correct and applicable to the scope of work (SOW)

  3. Work breakdown structure guide

    SciTech Connect (OSTI)

    Not Available

    1987-02-06

    Utilization of the work breakdown structure (WBS) technique is an effective aid in managing Department of Energy (DOE) programs and projects. The technique provides a framework for project management by focusing on the products that are being developed or constructed to solve technical problems. It assists both DOE and contractors in fulfilling their management responsibilities. This document provides guidance for use of the WBS technique for product oriented work identification and definition. It is one in a series of policy and guidance documents supporting DOE's project manaagement system.

  4. Purchasing Energy-Efficient Commercial Refrigerators and Freezers...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    tables; convertible temperature equipment, and laboratory-grade products are excluded. ... Incorporate Federal Acquisition Regulation Language in Contracts These mandatory ...

  5. Refrigerators and Refrigerator-Freezers (Appendix A1 after May...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy (DOE) develops standardized data templates for reporting the results of tests conducted in accordance with current DOE test procedures. Templates may be used by...

  6. Ex Parte Communication_Kitable Refrigerator/Freezer Guidance

    Broader source: Energy.gov [DOE]

    This memo memorializes the meeting between AHAM and the Department of Energy on September 25, for inclusion in the public docket. In summary, we discussed the need for DOE guidance regarding the...

  7. System for maintaining materials at freezer temperatures for shipping

    DOE Patents [OSTI]

    Schabron, John F. (Laramie, WY); Sorini-Wong, Susan S. (Laramie, WY)

    2007-08-28

    At least one embodiment of the inventive technology relates to a frozen environmental sample temperature control system that comprises a frozen formulation having water in an amount from substantially 87% to 78% by weight of the formulation, and salt in an amount from substantially 13% to 22% by weight of the formulation, the system further including at least one container containing the frozen formulation; and a cooler having insulating material disposed between an outer wall and an inner surface that defines an inner chamber into which the at least one container and the at least one frozen environmental sample may be placed for storage and/or transport. Various embodiments may incorporate specific types of insulating material and/or adaptations to an inner surface of the cooler to enhance the insulation effected thereby.

  8. Interview: LaborWorks@NeighborWorks Provides Vermont Contractors...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need ...

  9. Durability Working Group

    Broader source: Energy.gov [DOE]

    Description, technical targets, meeting archives, and contacts for the DOE Durability Working Group, which meets twice per year to exchange information, create synergies, and collaboratively develop both an understanding of and tools for studying degradation mechanisms of polymer electrolyte fuel cell stacks.

  10. Work Force Discipline

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1983-03-23

    The order provides guidance and procedures and states responsibilities for maintaining work force discipline in DOE. Chg 1, dated 3-11-85; Chg 2, dated 1-6-86; Chg 3, dated 3-21-89; Chg 4, dated 8-2-90; Chg 5, dated 3-9-92; Chg 6, dated 8-21-92, cancels Chg 5.

  11. Work plan (Nov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM STM Cloud Modeling Working Group Session AGENDA Brief introduction of new ARM funded modeling projects: ---------------------------------------------------------------------------------------------------------- 1:00 pm - 1:05 pm Understanding and Improving CRM and GCM Simulations of Cloud Systems with ARM Observations (Xiaoqing Wu, Iowa State University) 1:05 pm - 1:10 pm Interactions of Cumulus Convection and the Boundary Layer at the Southern Great Plains ACRF (Steve Krueger, University of

  12. Quality Work Plan Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 | Energy Efficiency and Renewable Energy eere.energy.gov ACI Detroit Quality Work Plan Update April 2014 QWP: Background Culmination of a multi-year investment aimed at demonstrating quality and accountability in the WAP Taking action on lessons learned through various quality assurance reviews Establishing WAP as a national leader in technical resources and quality assurance Improving long term sustainability by building the foundation of the national industry with WAP at the core 2

  13. Buildings Sector Working Group

    Gasoline and Diesel Fuel Update (EIA)

    July 22, 2013 AEO2014 Model Development For discussion purposes only Not for citation Overview Builldings Working Group Forrestal 2E-069 / July 22, 2013 2 * Residential projects - RECS update - Lighting model - Equipment, shell subsidies - ENERGY STAR benchmarking - Housing stock formation and decay * Commercial projects - Major end-use capacity factors - Hurdle rates - ENERGY STAR buildings * Both sectors - Consumer behavior workshop - Comparisons to STEO - AER  MER - Usual annual updates -

  14. Emergency Preparedness Working

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 24, 2015 Emergency Preparedness Working Group (EPWG) Grant * Nevada Field Office funds the EPWG grant based on $.50 per cubic foot of low-level/mixed low-level waste disposed at the Nevada National Security Site * EPWG consists of six Nevada counties: Clark, Elko, Esmeralda, Lincoln, Nye, and White Pine * EPWG addresses grant administration issues and any cross-cutting emergency related questions that incorporate grant funding or are required to attain operations level emergency response

  15. Microsoft Word - Contract Sections B-H.DOC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C Page C-1 Section C Statement of Work Table of Contents Section Page C.1 Introduction C-3 C.1.a The Hanford Site C-3 C.1.b Occupational Medical Services Program C-4 C.2 Purpose of This Contract C-4 C.3 Desired Outcomes C-4 C.4 Desired Objectives C-4 C.5 Scope C-5 C.5.a Types of Services C-5 C.5.b Accreditation Requirements C-5 C.5.c Resources C-5 C.5.d Location of Performance C-6 C.6 Applicable Documents C-6 C.7 Performance Measurement C-6 C.8 General Performance Requirements C-7 C.8.a

  16. 6-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 9, 2011 Page 1 of 1 RIVER & PLATEAU COMMITTEE - 6 MONTH WORK PLAN January * River Corridor Cleanup, using 100 K as an Example * Draft A, 100 K Proposed Plan * PW-1,3,6/CW-5 ROD: Draft letter February * TPA Milestone Delays for Central Plateau - 30 month delay on interim milestones driven by funding. Information session. * TRU Burial Grounds in 200 W (PU Waste Excavated from Z9 in 1973) * Barriers discussion (follow up from workshop) * 300 Area RI/FS (document due in December) *

  17. Work Force Restructuring Activities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Force Restructuring Activities December 10, 2008 Note: Current updates are in bold # Planned Site/Contractor HQ Approved Separations Status General * LM has finalized the compilation of contractor management team separation data for the end of FY07 actuals and end of FY08 and FY09 projections. LM has submitted to Congress the FY 2007 Annual Report on contractor work force restructuring activities. The report has been posted to the LM website. *LM conducted a DOE complex-wide data call to the

  18. How ICF Works

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    science / icf How ICF Works Shiva Laser When the 20-beam Shiva laser was completed in 1978, it was the world's most powerful laser. It delivered more than ten kilojoules of energy in less than a billionth of a second in its first full-power firing. About the size of a football field, Shiva was the latest in a series of laser systems built over two decades, each five to ten times more powerful than its predecessor. Since the late 1940s, researchers have used magnetic fields to confine hot,

  19. How Lasers Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How Lasers Work "Laser" is an acronym for light amplification by stimulated emission of radiation. A laser is created when the electrons in atoms in special glasses, crystals, or gases absorb energy from an electrical current or another laser and become "excited." The excited electrons move from a lower-energy orbit to a higher-energy orbit around the atom's nucleus. When they return to their normal or "ground" state, the electrons emit photons (particles of light).

  20. How NIF Works

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How NIF Works A weak laser pulse-about 1 billionth of a joule-is created, split, and carried on optical fibers to 48 preamplifiers that increase the pulse's energy by a factor of 10 billion, to a few joules. The 48 beams are then split into four beams each for injection into the 192 main laser amplifier beamlines. Each beam zooms through two systems of large glass amplifiers, first through the power amplifier and then into the main amplifier. In the main amplifier, a special optical switch traps

  1. How it works

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How it works MINERvA is a particle physics experiment, located at Fermi National Accelerator Laboratory in Batavia, Illinois. MINERvA was designed to perform high-precision measurements of neutrino interactions on a wide variety of materials, including water, helium, carbon, iron, lead, and plastic. MINERvA is located 100 meters underground, and sits directly in front of the MINOS near detector. The source of MINERvA's neutrino beam is the Neutrinos at the Main Injector beamline, or NuMI. NuMI

  2. HANFORD ENGINEER WORKS

    Office of Legacy Management (LM)

    HANFORD ENGINEER WORKS IJd *P-t - - ~~~ssiticatiC+n cwcetted rat G.E. NUCLEONICS PROJECT xi I ~@L.%&~--G-ENERAI,@ ELECTRIC z ,m ._.__.-. _ I--..-. By Authority of. COMPANY ._ Atmic Energy Commission Office of Hanford Dire&xl Operations Riohland, Washington Attention; Mr. Carleton Shugg, Manager ./ ALPKA-ROLLED EL'GIL%I jw -879 ' . *_ a. f' Richland, Washington February 6, 1948 , Thla Dclc.Jv-<en! :-; . ' - -*...-- f_ ~~~.s No .__. ._. .s / ~. - J-LccIp%. Fr:*? fi This will con&rm

  3. Spontaneous Potential (book section) | Open Energy Information

    Open Energy Info (EERE)

    Reference LibraryAdd to library Book Section: Spontaneous Potential (book section) Author NA Published NA, The date "NA" was not understood.The date "NA" was not understood....

  4. Section 12 | OpenEI Community

    Open Energy Info (EERE)

    Contributor 4 September, 2012 - 21:36 Idaho Meeting 2 endangered species Fauna Fish and Wildlife Flora FWS Section 12 Section 7 The second Idaho GRR meeting was held today...

  5. Section 7 | OpenEI Community

    Open Energy Info (EERE)

    Contributor 4 September, 2012 - 21:36 Idaho Meeting 2 endangered species Fauna Fish and Wildlife Flora FWS Section 12 Section 7 The second Idaho GRR meeting was held today...

  6. Section B: Supplies, Services and Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECTION B SUPPLIES AND SERVICES AND PRICECOSTS Request for Proposal DE-RP36-07GO97036 PART I SECTION B SUPPLIES AND SERVICES AND PRICECOSTS TABLE OF CONTENTS B.1 Service Being ...

  7. Regulatory Review Comment Section | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiation Protection of the Public and the Environment » Regulatory Review Comment Section Regulatory Review Comment Section DOE Comments on Radiation Protection (Atomic Energy Act) DOE Comments on Radioactive Waste

  8. OpenEI Community - Section 12

    Open Energy Info (EERE)

    http:en.openei.orgcommunityblogidaho-meeting-2comments endangered species Fauna Fish and Wildlife Flora FWS Section 12 Section 7 Wed, 05 Sep 2012 04:36:43 +0000 Kyoung 488...

  9. Part V: Section H: Special Contract Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DE-AC36-08GO28308 Modification M801 Section H - Page 2 of 50 PART I SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 No Third Party Beneficiaries...

  10. Sandia National Laboratories: Working with Sandia: Terms and Conditions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contractor/Bidder Information Opportunities Potential Suppliers Current Suppliers Accounts Payable Contract Audit Contractor/Bidder Information Section II Terms and Conditions Construction and Facilities iSupplier Account IT Transformation Services Staff Augmentation What Does Sandia Buy? Working with Sandia General Provisions (Section II Terms and Conditions) Instructions for General Provisions (Section II Terms & Conditions) or contracts that state "(current version as of Rev. 0

  11. Section 1705 Loan Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Section 1705 Loan Program Section 1705 Loan Program About the Section 1705 Loan Program The Section 1705 Loan Program authorizes loan guarantees for U.S.-based projects that commenced construction no later than September 30, 2011 and involve certain renewable energy systems, electric power transmission systems, and leading edge biofuels. To become more familiar with the program, please review Title XVII and the Final Rule and read each solicitation carefully for specific requirements that were

  12. Section 1703 Loan Program | Department of Energy

    Energy Savers [EERE]

    Section 1703 Loan Program Section 1703 Loan Program About the Section 1703 Loan Program Section 1703 of Title XVII of the Energy Policy Act of 2005 authorizes the U.S. Department of Energy to support innovative clean energy technologies that are typically unable to obtain conventional private financing due to high technology risks. In addition, the technologies must avoid, reduce, or sequester air pollutants or anthropogenic emissions of greenhouse gases. Technologies we will consider include:

  13. How NIF Works

    ScienceCinema (OSTI)

    None

    2010-09-01

    The National Ignition Facility, located at Lawrence Livermore National Laboratory, is the world's largest laser system... 192 huge laser beams in a massive building, all focused down at the last moment at a 2 millimeter ball containing frozen hydrogen gas. The goal is to achieve fusion... getting more energy out than was used to create it. It's never been done before under controlled conditions, just in nuclear weapons and in stars. We expect to do it within the next 2-3 years. The purpose is threefold: to create an almost limitless supply of safe, carbon-free, proliferation-free electricity; examine new regimes of astrophysics as well as basic science; and study the inner-workings of the U.S. stockpile of nuclear weapons to ensure they remain safe, secure and reliable without the need for underground testing. More information about NIF can be found at:

  14. Working Group Report: Sensors

    SciTech Connect (OSTI)

    Artuso, M.; et al.,

    2013-10-18

    Sensors play a key role in detecting both charged particles and photons for all three frontiers in Particle Physics. The signals from an individual sensor that can be used include ionization deposited, phonons created, or light emitted from excitations of the material. The individual sensors are then typically arrayed for detection of individual particles or groups of particles. Mounting of new, ever higher performance experiments, often depend on advances in sensors in a range of performance characteristics. These performance metrics can include position resolution for passing particles, time resolution on particles impacting the sensor, and overall rate capabilities. In addition the feasible detector area and cost frequently provides a limit to what can be built and therefore is often another area where improvements are important. Finally, radiation tolerance is becoming a requirement in a broad array of devices. We present a status report on a broad category of sensors, including challenges for the future and work in progress to solve those challenges.

  15. Panasonic Electric Works Ltd formerly Matsushita Electric Works...

    Open Energy Info (EERE)

    Electric Works Ltd (formerly Matsushita Electric Works) Place: Kadoma-shi, Osaka, Japan Zip: 571-8686 Product: Japanese manufacturer of mainly electric appliances including...

  16. SNL RML recommended dosimetry cross section compendium

    SciTech Connect (OSTI)

    Griffin, P.J.; Kelly, J.G.; Luera, T.F.; VanDenburg, J.

    1993-11-01

    A compendium of dosimetry cross sections is presented for use in the characterization of fission reactor spectrum and fluence. The contents of this cross section library are based upon the ENDF/B-VI and IRDF-90 cross section libraries and are recommended as a replacement for the DOSCROS84 multigroup library that is widely used by the dosimetry community. Documentation is provided on the rationale for the choice of the cross sections selected for inclusion in this library and on the uncertainty and variation in cross sections presented by state-of-the-art evaluations.

  17. Part IV: Section E - Inspection and Acceptance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECTION E INSPECTION AND ACCEPTANCE DE-AC36-08GO28308 Modification M901 Section E - Page ii PART I SECTION E INSPECTION AND ACCEPTANCE TABLE OF CONTENTS E.1 FAR 52.246-9 Inspection of Research and Development (Short Form) (Apr 1984) 1 E.2 Acceptance 1 E.3 Certification 1 DE-AC36-08GO28308 Modification M901 Section E - Page 1 of 1 PART I SECTION E INSPECTION AND ACCEPTANCE E.1 FAR 52.246-9 Inspection of Research and Development (Short Form) (Apr 1984) The Government has the right to inspect and

  18. Section L - Attachment D - Past-Performance Information Form

    National Nuclear Security Administration (NNSA)

    L, Attachment E, Page 1 SECTION L ATTACHMENT E PAST PERFORMANCE INFORMATION FORM 1. Complete Name of Offeror or Team Member 2. Contract Title and Location 3. Customer Name, Current Address, Telephone Number and E-mail 4. Contract Number and Type of Contract 5. Date of Contract Award 6. Date Work Commenced 7. Date the Work was Completed 8. Initial Contract Price /Estimated Cost and Fee 9. Final Amount Invoiced/Amount Invoiced to Date 10a. Technical Point of Contact (see instruction below) 10b.

  19. Section L - Attachment D - Past-Performance Information Form

    National Nuclear Security Administration (NNSA)

    E, Page 1 SECTION L ATTACHMENT E PAST PERFORMANCE INFORMATION FORM 1. Complete Name of Offeror or Team Member 2. Contract Title and Location 3. Customer Name, Current Address, Telephone Number and E-mail 4. Contract Number and Type of Contract 5. Date of Contract Award 6. Date Work Commenced 7. Date the Work was Completed 8. Initial Contract Price /Estimated Cost and Fee 9. Final Amount Invoiced/Amount Invoiced to Date 10a. Technical Point of Contact (see instruction below) 10b. Contracting

  20. Microsoft Word - DE-AC06-09RL15009 Section F.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Page F-1 Section F Deliveries and Performance Table of Contents Section Title Page No. F.1 Period of Performance F-2 F.2 Principal Place of Performance F-2 F.3 Reporting Requirements F-2 F.4 FAR 52.242-15 Stop-Work Order. (AUG 1989) F-4 F.5 FAR 52.242-17 Government Delay of Work. (APR 1984) F-5 Workers' Compensation Claims Services Part I Contract No.DE-AC06-09RL15009 Section F Page F-2 F.1 Period of Performance The period of performance (exclusive of the Transition Period) for the work

  1. CRAD, Work Controls Assessment Plan

    Broader source: Energy.gov [DOE]

    Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed.

  2. METAL MEDIA FILTERS, AG-1 SECTION FI

    SciTech Connect (OSTI)

    Adamson, D.

    2012-05-23

    One application of metal media filters is in various nuclear air cleaning processes including applications for protecting workers, the public and the environment from hazardous and radioactive particles. To support this application the development of the ASME AG-1 FI Standard on Metal Media has been under way for more than ten years. Development of the proposed section has required resolving several difficult issues associated with operating conditions (media velocity, pressure drop, etc.), qualification testing, and quality acceptance testing. Performance characteristics of metal media are dramatically different than the glass fiber media with respect to parameters like differential pressures, operating temperatures, media strength, etc. These differences make existing data for a glass fiber media inadequate for qualifying a metal media filter for AG-1. In the past much work has been conducted on metal media filters at facilities such as Lawrence Livermore National Laboratory (LLNL) and Savannah River National Laboratory (SRNL) to qualify the media as High Efficiency Particulate Air (HEPA) Filters. Particle retention testing has been conducted at Oak Ridge Filter Test Facility and at Air Techniques International (ATI) to prove that the metal media meets or exceeds the 99.97% particle retention required for a HEPA Filter. Even with his testing, data was lacking to complete an AG-1 FI Standard on metal media. With funding secured by Mississippi State University (MSU) from National Nuclear Security Administration (NNSA), a research test stand is being designed and fabricated at MSU's Institute for Clean Energy Technology (ICET) Facility to obtain qualification data on metal media. This in turn will support required data needed for the FI Standard. The paper will discuss in detail how the test stand at MSU will obtain the necessary data to complete the FI Standard.

  3. Expandable mixing section gravel and cobble eductor

    DOE Patents [OSTI]

    Miller, Arthur L. (Kenyon, MN); Krawza, Kenneth I. (Lakeville, MN)

    1997-01-01

    In a hydraulically powered pump for excavating and transporting slurries in hich it is immersed, the improvement of a gravel and cobble eductor including an expandable mixing section, comprising: a primary flow conduit that terminates in a nozzle that creates a water jet internal to a tubular mixing section of the pump when water pressure is applied from a primary supply flow; a tubular mixing section having a center line in alignment with the nozzle that creates a water jet; a mixing section/exit diffuser column that envelopes the flexible liner; and a secondary inlet conduit that forms an opening at a bas portion of the column and adjacent to the nozzle and water jet to receive water saturated gravel as a secondary flow that mixes with the primary flow inside of the mixing section to form a combined total flow that exits the mixing section and decelerates in the exit diffuser.

  4. Cross Sections for Electron Collisions with Methane

    SciTech Connect (OSTI)

    Song, Mi-Young Yoon, Jung-Sik; Cho, Hyuck; Itikawa, Yukikazu; Karwasz, Grzegorz P.; Kokoouline, Viatcheslav; Nakamura, Yoshiharu; Tennyson, Jonathan

    2015-06-15

    Cross section data are compiled from the literature for electron collisions with methane (CH{sub 4}) molecules. Cross sections are collected and reviewed for total scattering, elastic scattering, momentum transfer, excitations of rotational and vibrational states, dissociation, ionization, and dissociative attachment. The data derived from swarm experiments are also considered. For each of these processes, the recommended values of the cross sections are presented. The literature has been surveyed through early 2014.

  5. ACHP - Section 106 Regulations Flowchart Explanatory Material...

    Open Energy Info (EERE)

    Explanatory Material Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: ACHP - Section 106 Regulations Flowchart Explanatory Material Abstract This...

  6. RPM Sections - RPM-2 RPM-2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    clock History Browse Pages Blog Labels Attachments Index Recent updates RSS feed builder Home RPM Sections Asset Management Information Technology (Assets) Lifecycle Management...

  7. Part IV: Section G - Contract Administration Data

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    G CONTRACT ADMINISTRATION DATA DE-AC36-08GO28308 Modification M901 Section G - Page ii PART I SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.1 Contracting Officer's Representative(s) 1 G.2 Contract Administration 1 G.3 Modification Authority 1 G.4 Monthly Cost Reports 1 G.5 Indirect Charges 2 DE-AC36-08GO28308 Modification M901 Section G - Page 1 of 2 PART I SECTION G CONTRACT ADMINISTRATION DATA G.1 Contracting Officer's Representative(s) Contracting Officer's Representative(s)

  8. Cal. PRC Section 21065 - Environmental Quality Definitions |...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Cal. PRC Section 21065 - Environmental Quality DefinitionsLegal Abstract Contains...

  9. Montana Watershed Protection Section Contacts Webpage | Open...

    Open Energy Info (EERE)

    contact information for the Watershed Protection Section of the Water Quality Planning Bureau. Author Montana Water Quality Planning Bureau Published State of Montana, Date Not...

  10. Clean Energy Works Oregon (CEWO)

    Broader source: Energy.gov [DOE]

    Presents Clean Energy Works Oregon's program background and the four easy steps to lender selection.

  11. High Temperature Membrane Working Group

    Broader source: Energy.gov [DOE]

    This presentation provides an overview of the High Temperature Membrane Working Group Meeting in May 2007.

  12. Video Shoot Scope of Work

    Broader source: Energy.gov [DOE]

    Video Shoot Scope of Work, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  13. Technology Transfer Working Group (TTWG) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Transfer Working Group (TTWG) Technology Transfer Working Group (TTWG) With the passage of the Energy Policy Act of 2005, Title X, Sec. 1001, the Secretary of Energy was directed to establish a Technology Transfer Working Group (TTWG), to include representatives from DOE National Laboratories and single purpose research facilities. The same section of the Act also directs the Secretary to appoint a Technology Transfer Coordinator. The duties of the Technology Transfer Coordinator

  14. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    gas from Owatonna Public Utilities. Equipment rebates for refrigerators, freezers and room air conditioners can be increased by properly recycling previously used, working...

  15. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Xcel Energy- Appliance Recycling Rebate Program The Appliance Recycling Program offers free pick up and recycling of old, inefficient, working refrigerators and freezers....

  16. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    of old, inefficient, working refrigerators and freezers. Participants will receive a 40 reward per appliance recycled, and must be... Eligibility: Commercial, Local Government,...

  17. Xcel Energy - Appliance Recycling Rebate Program | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Program Rebate Amount 40appliance Summary The Appliance Recycling Program offers free pick up and recycling of old, inefficient, working refrigerators and freezers....

  18. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    energy audits, and custom measures. Recycling rebates for refrigerators, freezers and room air conditioners are only available to customers who properly recycle their old working...

  19. Radiation Safety Work Control Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Safety Work Control Form (see instructions on pg-3) Rev. May 2014 Area: Form #: Date: Preliminary Applicability Screen: (a) Will closing the beam line injection stoppers mitigate the radiological hazards introduced by the proposed work? Yes No (b) Can the closed state of the beam line injection stoppers be assured during the proposed work (ie., work does NOT involve injection stoppers or associated HPS)? Yes No If the answers to both questions are yes, the work can be performed safely

  20. Differential two-body compound nuclear cross section, including the width-fluctuation corrections

    SciTech Connect (OSTI)

    Brown, D.; Herman, M.

    2014-09-02

    We figure out the compound angular differential cross sections, following mainly Frbrich and Lipperheide, but with the angular momentum couplings that make sense for optical model work. We include the width-fluctuation correction along with calculations.

  1. Plateau Remediation Contract Section J Contract No. DE-AC06...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J-11, Revision 2 PRC STATEMENT OF WORK SECTION ASSIGNED WBS ELEMENTS CLIN C.2.1 Transition 013.01 Project Management - PBS RL-13 1 C.2.1 Transition 030.04 Project Management 1...

  2. MiniBooNE Cross Sections

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sections Group e-mail: BOONE-CROSSSECTIONS(AT)fnal.gov convenors: Alessandro Curioni (alessandro.curioni(AT)yale.edu) and Sam Zeller (gzeller(AT)fnal.gov) Cross Sections at MiniBooNE, Meetings, Reference Articles, Conferences, Useful Links Last updated on 07/19/07

  3. Part V: Section H - Special Contract Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    H SPECIAL CONTRACT REQUIREMENTS DE-AC36-08GO28308 Modification M962 Section H - Page 2 of 52 PART I SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 No Third Party Beneficiaries ............................................................................................. 4 H.2 Reserved ............................................................................................................................ 4 H.3 Employee Compensation: Pay and Benefits

  4. Section M: Evaluations Factors for Award

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    V SECTION M EVALUATION FACTORS FOR AWARD Request for Proposal # DE-RP36-07GO97036 PART V SECTION M EVALUATION FACTORS FOR AWARD TABLE OF CONTENTS M.1 Evaluation of Proposals ..........................................................................................1 M.2 Evaluation Criteria..................................................................................................1 M.3 Basis For Award

  5. Request for Proposal NO. DE-SOL-0008418 Section J, Appendix K, Page 1

    National Nuclear Security Administration (NNSA)

    NO. DE-SOL-0008418 Section J, Appendix K, Page 1 SECTION J APPENDIX K PROGRAM MANAGEMENT AND COST REPORTS The Contractor shall submit periodic cost, schedule, and technical performance plans and reports in such form and substance as required by the Contracting Officer. Reference Section J, Appendix A, Statement of Work, Chapter I, paragraph 3.3. Cost reports will include at a minimum: 1. Monthly general management reports to summarize schedule, labor and cost plans and status, and provide

  6. ARM - Engineering Work Request & Engineering Work Order Guidelines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Request & Engineering Work Order Guidelines Page Contents: Introduction Discussion of the ARM Climate Research Facility Engineering Process: The Engineering Change Request (ECR) and the Engineering Change Order (ECO) Operations and Engineering Task Consulting: The Engineering Work Request (EWR) and the Engineering Work Order (EWO) Relationship of the ECR/ECO and EWR/EWO to the Engineering Task Tracking Tool Relationship of the ECR/ECO and EWR/EWO to the Existing Configuration Control

  7. Work for Others Program Interagency Work | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Presented to the Commission to Review the Effectiveness of National Energy Laboratories by Devon Streit, Associate Director, Laboratory Policy and Evaluation, Office of Science. PDF icon Work For Others Program, Interagency Work More Documents & Publications DOE O 481.1C, WORK FOR OTHERS (NON-DEPARTMENT OF ENERGY FUNDED WORK) Aligned Partnerships Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories

  8. Quality Work Plan Training Requirement

    Broader source: Energy.gov [DOE]

    Weatherization Assistance Program's comprehensive Quality Work Plan requirements and resources to meet this obligation in the field.

  9. Healthy Housing Opportunities During Weatherization Work

    SciTech Connect (OSTI)

    Wilson, J.; Tohn, E.

    2011-03-01

    In the summer and early fall of 2010, the National Center for Healthy Housing interviewed people from a selection of state and local agencies that perform weatherizations on low-income housing in order to gauge their approach to improving the health and safety of the homes. The interviews provided a strong cross section of what work agencies can do, and how they go about funding this work when funds from the Weatherization Assistance Program (WAP) do not cover the full extent of the repairs. The report also makes recommendations for WAP in how to assist agencies to streamline and maximize the health and safety repairs they are able to make in the course of a standard weatherization.

  10. Meeting Summary, Credit Trading Work Group

    SciTech Connect (OSTI)

    Kevin Bryan

    2000-12-07

    OAK-B135 Credit Trading Work Group Meeting Summary. The purpose of the meeting is to: (1) Provide an opportunity for NWCC Work Group Members, NWCC Members, and invited expert participants to hear an overview of the draft NWCC Credit Trading Report and to critically review and discuss the report's recommendations and principles. (2) Hear presentations from several perspectives of other experts on credit trading which provide: (a) a brief summary of credit trading activities they are involved in, and (b) critical responses to the NWCC draft report. (3) Identify how the report can be improved at the big picture level. Attempt to resolve issues or concerns if necessary. (4) Discuss the recommendations and credit trading principles in detail and attempt to reach consensus on these sections for presentation to the NWCC. (5) Discuss if any of the outreach and communication recommendations in the report should be conducted by the NWCC.

  11. Contract No. DE-AC02-07CH11358 Section F Contract Modification No. 0139

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Contract Modification No. 0139 i PART I SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS PAGE NO. F.1 - PERIOD OF PERFORMANCE F-1 F.2 - AWARD TERM INCENTIVE (SPECIAL) F-1 F.3 - FAR 52.242-15 - STOP WORK ORDER (AUG 1989) - ALTERNATE I (APR 1984) F-4 F.4 - STOP WORK AND SHUTDOWN AUTHORITY F-5 F.5 - PRINCIPAL PLACE OF PERFORMANCE F-5 Contract No. DE-AC02-07CH11358 Section F Contract Modification No. 0139 F-1 PART I SECTION F - DELIVERIES OR PERFORMANCE F.1 - PERIOD OF PERFORMANCE (a) This

  12. Section 54: Scope of Compliance Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transport pathway is through the anhydrite marker beds, as assumed in previous CRAs and the CCA (Appendix IGP-2014, Section IGP-2.2.1 ). The DOE's approach to compliance...

  13. Microsoft Word - SECTION D.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Occupational Medical Services at Hanford D-1 PART I - THE SCHEDULE SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 PACKAGING ..................................................................................................................................... D-2 D.2 MARKING ......................................................................................................................................... D-2 D.3 SECURITY REQUIREMENTS

  14. SECTION L ? ATTACHMENT A - PERFORMANCE GUARANTEE AGREEMENT

    National Nuclear Security Administration (NNSA)

    Guarantor affirms that the Government shall not be Request for Proposal No. DE-SOL-0008418 Section L, Attachment A, Page 2 required to first commence any action or obtain...

  15. Guidance for EPAct 2005 Section 242 Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for EPAct 2005 Section 242 Program I. Purpose In the Energy Policy Act of 2005 (EPAct 2005; Public Law 109-58) Congress established a new program to support the expansion of hydropower energy development at existing dams and impoundments through an incentive payment procedure. Under section 242 of EPAct 2005, the Secretary of Energy is directed to provide incentive payments to the owner or authorized operator of qualified hydroelectric facilities for electric energy generated and sold

  16. Section 999 Program Library | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Offshore Drilling » Section 999 Program Library Section 999 Program Library Cost-Shared Program Publications October 2, 2013 UDAC Meeting - October 2013 October 2, 2013 URTAC Meeting - October 2013 September 10, 2013 Draft 2014 Annual Plan More Ultra-Deepwater Advisory Committee (UDAC) Activities and Products January 27, 2014 UDAC 2014 Report November 27, 2013 UDAC Meeting - December 16, 2013 November 20, 2013 UDAC Meeting - December 9, 2013 More Unconventional Resources Technology Advisory

  17. Section 999: Annual Plans | Department of Energy

    Energy Savers [EERE]

    Section 999: Annual Plans Section 999: Annual Plans October 2, 2013 UDAC Meeting - October 2013 Federal Register Notice for October 8, 2013 UDAC Meeting The 24th Meeting of the Ultra-Deepwater Advisory Committee (UDAC), previously scheduled for October 8, 2013, is postponed until further notice due to a lapse in Federal funding. October 2, 2013 URTAC Meeting - October 2013 Federal Register Notice for October 10, 2013 URTAC Meeting The 24th Meeting of the Unconventional Resources Technology

  18. WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL

    Office of Legacy Management (LM)

    WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community

  19. July 2012, Work Force Retention Work Group Status Overview

    Office of Environmental Management (EM)

    Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group

  20. Part VI: Section I - Contract Clauses

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... -- Notice of Buy American Act Requirement - ... 101 I.93 952.204-75 -- PUBLIC AFFAIRS (DEC 2000) ... ENVIRONMENT, SAFETY, AND HEALTH INTO WORK PLANNING AND ...

  1. Interview: LaborWorks@NeighborWorks Provides Vermont Contractors...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vermont Contractors With Help When They Need It NeighborWorks of Western Vermont ... organization to fulfill our contractors' need for a temporary workforce for home ...

  2. Microsoft Word - DE-AC06-09RL15009 Section C.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Part I Contract No. DE-AC06-09RL15009 Section C Page C-1 Section C Statement of Work Table of Contents Section Page C.1 Introduction C-2 C.2 Performance Requirements, CLIN0001-CLIN0007 C-3 C.3 Additional Performance Requirements for Claims Management C-3 C.4 Management and Oversight of Insurance Claim Number 8600434 C-7 C.5 Energy Employees Occupational Illness Compensation Program Act (EEOICPA) CLIN0008 C-7 Workers' Compensation Claims Services Part I Contract No. DE-AC06-09RL15009 Section C

  3. Work For Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-09-28

    Work for Others (WFO) is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1A.

  4. Work For Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-01-03

    Work for Others (WFO) is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. WFO has the following objectives. Cancels DOE O 481.1.

  5. Working with SRNL - Technology Partnerships

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    13/2015 SEARCH SRNL GO SRNL Home Technology Partnerships Working with SRNL Technology Partnerships Work for Others and Cooperative Research and Development Agreements SRNL is pleased to provide a variety of business arrangements whereby our technologies or capabilities can be utilized to benefit the general public. We welcome opportunities to bring new technologies to the marketplace by closely working with industry, universities, or state and local government agencies. With its wide spectrum of

  6. High Temperature Membrane Working Group

    Broader source: Energy.gov [DOE]

    The High Temperature Membrane Working Group consists of government, industry, and university researchers interested in developing high temperature membranes for fuel cells.

  7. INL @ work: Nuclear Reactor Operator

    ScienceCinema (OSTI)

    Russell, Patty

    2013-05-28

    INL @ work features jobs at the Idaho National Laboratory. Learn more about careers and energy research at INL's facebook site http://www.facebook.com/idahonationallaboratory

  8. Radiation Safety Work Control Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Safety Work Control Form (see instructions on pg-3) Rev. May 2014 Area: Form : Date: Preliminary Applicability Screen: (a) Will closing the beam line injection stoppers...

  9. Working with SRNL - Technology Transfer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SRNL GO Tech Briefs Contacts Ombudsman Tech Home SRNL Home Working with SRNL Technology Transfer 2015 SRNL Research and Technology Recognition Reception Click to view the 2015...

  10. American Bar Association Section on Environment | Open Energy...

    Open Energy Info (EERE)

    Bar Association Section on Environment Jump to: navigation, search Name: American Bar Association Section on Environment Place: Chicago, Illinois Zip: 60610 Product: The Section of...

  11. NDAA Section 3116 Waste Determinations with Related Disposal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NDAA Section 3116 Waste Determinations with Related Disposal Performance Assessments NDAA Section 3116 Waste Determinations with Related Disposal Performance Assessments Section...

  12. Precise neutron inelastic cross section measurements

    SciTech Connect (OSTI)

    Negret, Alexandru [Horia Hulubei National Institute for Physics and Nuclear Engineering, Reactorului 30, 077125 Bucharest-Magurele (Romania)

    2012-11-20

    The design of a new generation of nuclear reactors requires the development of a very precise neutron cross section database. Ongoing experiments performed at dedicated facilities aim to the measurement of such cross sections with an unprecedented uncertainty of the order of 5% or even smaller. We give an overview of such a facility: the Gamma Array for Inelastic Neutron Scattering (GAINS) installed at the GELINA neutron source of IRMM, Belgium. Some of the most challenging difficulties of the experimental approach are emphasized and recent results are shown.

  13. Covariance Evaluation Methodology for Neutron Cross Sections

    SciTech Connect (OSTI)

    Herman,M.; Arcilla, R.; Mattoon, C.M.; Mughabghab, S.F.; Oblozinsky, P.; Pigni, M.; Pritychenko, b.; Songzoni, A.A.

    2008-09-01

    We present the NNDC-BNL methodology for estimating neutron cross section covariances in thermal, resolved resonance, unresolved resonance and fast neutron regions. The three key elements of the methodology are Atlas of Neutron Resonances, nuclear reaction code EMPIRE, and the Bayesian code implementing Kalman filter concept. The covariance data processing, visualization and distribution capabilities are integral components of the NNDC methodology. We illustrate its application on examples including relatively detailed evaluation of covariances for two individual nuclei and massive production of simple covariance estimates for 307 materials. Certain peculiarities regarding evaluation of covariances for resolved resonances and the consistency between resonance parameter uncertainties and thermal cross section uncertainties are also discussed.

  14. LLNL Section I Clauses/Prescriptions

    National Nuclear Security Administration (NNSA)

    AC52-06NA27344 LLNL Section I, Page 56 Part II - Contract Clauses Section I I-1 CONTRACT CLAUSES Unless conditionally "Noted", all contract clauses are hereby incorporated by full text. The references cited herein are from the Federal Acquisition Regulation (FAR) (48 CFR Chapter 1) and the Department of Energy Acquisition Regulation (DEAR) (48 CFR Chapter 9). Note: The titles and page locations of the clauses are as follows: CLAUSE TITLE PAGE I001 FAR 52.202-1 DEFINITIONS (JUL 2004)

  15. SECTION J, APPENDIX L - DIVERSITY PLAN GUIDANCE

    National Nuclear Security Administration (NNSA)

    L, Page 1 SECTION J APPENDIX L [Note: The Diversity Plan shall be submitted to the Contracting Officer in accordance with DEAR 970.5226-1] DIVERSITY PLAN GUIDANCE 12/1/10 In accordance with the Contract's Section I Clause entitled "DEAR 970.5226-1, Diversity Plan," this Appendix provides guidance to assist the Contractor in understanding the information being sought by the Department of Energy, National Nuclear Security Administration (DOE/NNSA) for each of the clause's Diversity

  16. Quality Work Plan Communications Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communications Requirement Quality Work Plan Communications Requirement Graphic of a conversation bubble. The Weatherization Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality home energy upgrades. The plan includes a communication requirement that all WAP Grantees must meet. In this section you will learn more about this requirement and find resources and examples to help you meet this obligation in the field. Requirement Once field standards and

  17. Quality Work Plan Guidelines and Standards Requirement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Guidelines and Standards Requirement Quality Work Plan Guidelines and Standards Requirement an icon of a page The Weatherization Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality home energy upgrades. The plan includes a Guidelines and Standards requirement that all WAP Grantees must meet. In this section you will learn more about this requirement and find resources and examples to help you meet this obligation in the field. Requirement All

  18. Microsoft Word - Final FY14 EMR Committee Work Plan 093013

    Office of Environmental Management (EM)

    4 Work Plan Approved September 25, 2013 1 Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2014 Work Plan SECTION I. MISSION STATEMENT The Northern New Mexico Citizens' Advisory Board's ( NNMCAB) Environmental Monitoring and Remediation (EM&R) Committee provides an informed citizen's perspective to the Department of Energy (DOE) on current and future environmental remediation activities resulting from historical Los Alamos National

  19. Microsoft Word - Final FY14 EMR Committee Work Plan 093013

    Office of Environmental Management (EM)

    5 Work Plan Approved at the 11/19/2014 NNMCAB Board Meeting Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2015 Work Plan SECTION I MISSION STATEMENT The Northern New Mexico Citizens' Advisory Board's (NNMCAB) Environmental Monitoring and Remediation (EM&R) Committee provides an informed citizen's perspective to the Department of Energy (DOE) on current and future environmental monitoring and remediation activities related to

  20. Microsoft Word - Final FY14 EMR Committee Work Plan 093013

    Office of Environmental Management (EM)

    6 Work Plan Approved at the March 9, 2016 Combined Committee Meeting Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2016 Work Plan SECTION I MISSION STATEMENT The Northern New Mexico Citizens' Advisory Board's (NNMCAB) Environmental Monitoring and Remediation (EM&R) Committee provides an informed citizen's perspective to the Department of Energy (DOE) on current and future environmental monitoring and remediation activities related to

  1. B Plant Complex preclosure work plan

    SciTech Connect (OSTI)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

  2. Interagency Sustainability Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facilities Sustainable Buildings & Campuses Interagency Sustainability Working Group Interagency Sustainability Working Group The Interagency Sustainability Working Group ...

  3. WageWorks Screen Shot(s)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WageWorks Screen Shot(s)

  4. Testing (Validating?) Cross Sections with ICSBEP Benchmarks

    SciTech Connect (OSTI)

    Kahler, Albert C. III

    2012-06-28

    We discuss how to use critical benchmarks from the International Handbook of Evaluated Criticality Safety Benchmark Experiments to determine the applicability of specific cross sections to the end-user's problem of interest. Particular attention is paid to making sure the selected suite of benchmarks includes the user's range of applicability (ROA).

  5. Part IV: Section F - Deliveries or Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order (Aug 1989) (Alternate 1) (Apr 1984) 1 DE-AC36-08GO28308 Modification M933 ... F.3 FAR 52.242-15 Stop-Work Order (Aug 1989) (Alternate 1) (Apr 1984) (a) The Contracting ...

  6. IDS-NF Impact of Neutrino Cross Section Impact of Neutrino Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IDS-NF Impact of Neutrino Cross Section Impact of Neutrino Cross Section Knowledge on Oscillation Knowledge on Oscillation Measurements Measurements M. Sorel, IFIC (CSIC and U. of Valencia) IDS-NF, RAL, Jan 16-17 2008 M. Sorel - IFIC (Valencia U. & CSIC) 2 IDS-NF Neutrino Cross Sections: At What Energies Needed? Superbeams: Solid: T2K Dashed: NovA M. Sorel - IFIC (Valencia U. & CSIC) 3 IDS-NF Neutrino Cross Sections: At What Energies Needed? Superbeams: Solid: T2K Dashed: NovA Beta

  7. Work for Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-24

    Work for Others is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1B. Certified 1-13-11. Admin Chg 1, dated 3-14-11.

  8. September 2012, Work Force Retention Work Group Status Overview

    Energy Savers [EERE]

    Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 [Protective Force Personnel Medical, Physical Readiness, Training, and Access Authorization Standards] as a final rule that includes modification efforts to address barriers to workforce retention. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce

  9. Enabling Technologies for Ceramic Hot Section Components

    SciTech Connect (OSTI)

    Venkat Vedula; Tania Bhatia

    2009-04-30

    Silicon-based ceramics are attractive materials for use in gas turbine engine hot sections due to their high temperature mechanical and physical properties as well as lower density than metals. The advantages of utilizing ceramic hot section components include weight reduction, and improved efficiency as well as enhanced power output and lower emissions as a result of reducing or eliminating cooling. Potential gas turbine ceramic components for industrial, commercial and/or military high temperature turbine applications include combustor liners, vanes, rotors, and shrouds. These components require materials that can withstand high temperatures and pressures for long duration under steam-rich environments. For Navy applications, ceramic hot section components have the potential to increase the operation range. The amount of weight reduced by utilizing a lighter gas turbine can be used to increase fuel storage capacity while a more efficient gas turbine consumes less fuel. Both improvements enable a longer operation range for Navy ships and aircraft. Ceramic hot section components will also be beneficial to the Navy's Growth Joint Strike Fighter (JSF) and VAATE (Versatile Affordable Advanced Turbine Engines) initiatives in terms of reduced weight, cooling air savings, and capability/cost index (CCI). For DOE applications, ceramic hot section components provide an avenue to achieve low emissions while improving efficiency. Combustors made of ceramic material can withstand higher wall temperatures and require less cooling air. Ability of the ceramics to withstand high temperatures enables novel combustor designs that have reduced NO{sub x}, smoke and CO levels. In the turbine section, ceramic vanes and blades do not require sophisticated cooling schemes currently used for metal components. The saved cooling air could be used to further improve efficiency and power output. The objectives of this contract were to develop technologies critical for ceramic hot section components for gas turbine engines. Significant technical progress has been made towards maturation of the EBC and CMC technologies for incorporation into gas turbine engine hot-section. Promising EBC candidates for longer life and/or higher temperature applications relative to current state of the art BSAS-based EBCs have been identified. These next generation coating systems have been scaled-up from coupons to components and are currently being field tested in Solar Centaur 50S engine. CMC combustor liners were designed, fabricated and tested in a FT8 sector rig to demonstrate the benefits of a high temperature material system. Pretest predictions made through the use of perfectly stirred reactor models showed a 2-3x benefit in CO emissions for CMC versus metallic liners. The sector-rig test validated the pretest predictions with >2x benefit in CO at the same NOx levels at various load conditions. The CMC liners also survived several trip shut downs thereby validating the CMC design methodology. Significant technical progress has been made towards incorporation of ceramic matrix composites (CMC) and environmental barrier coatings (EBC) technologies into gas turbine engine hot-section. The second phase of the program focused on the demonstration of a reverse flow annular CMC combustor. This has included overcoming the challenges of design and fabrication of CMCs into 'complex' shapes; developing processing to apply EBCs to 'engine hardware'; testing of an advanced combustor enabled by CMCs in a PW206 rig; and the validation of performance benefits against a metal baseline. The rig test validated many of the pretest predictions with a 40-50% reduction in pattern factor compared to the baseline and reductions in NOx levels at maximum power conditions. The next steps are to develop an understanding of the life limiting mechanisms in EBC and CMC materials, developing a design system for EBC coated CMCs and durability testing in an engine environment.

  10. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  11. TEC Working Group Topic Groups Archives Mechanics of Funding and Techical

    Office of Environmental Management (EM)

    Assistance | Department of Energy Mechanics of Funding and Techical Assistance TEC Working Group Topic Groups Archives Mechanics of Funding and Techical Assistance Mechanics of Funding and Techical Assistance Items Available for Download PDF icon Funding Mechanisms Comparison Matrix More Documents & Publications TEC Working Group Topic Groups Section 180(c) Key Documents Implementation of Section 180(c) of the Nuclear Waste Policy Act TEC Working Group Topic Groups Tribal Conference Call

  12. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  13. Utility Security & Resiliency: Working Together

    Broader source: Energy.gov [DOE]

    Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—discusses Edison Electric Institute (EEI), including its key security objectives, key activities, cybersecurity activities, and spare transformer equipment program (STEP).

  14. Attachment 1 - Performance Work Statement

    National Nuclear Security Administration (NNSA)

    including TTR. Waste acceptance services will be performed at the NNSS and at waste generator sites. DE-SOL-0005982 Attachment 1 Page 1 2. Scope of Work 2.1 Requirement: The EPS...

  15. DOE Work Breakdown Structure Handbook

    Broader source: Energy.gov [DOE]

    This handbook provides suggested guidance and best practices on the development of product-oriented Work Breakdown Structures (WBS) that should be used by all projects within DOE to organize and...

  16. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to work at the ALS, a process which can...

  17. Submitting Work | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Submitting Work Customers may directly contact the supervisor of the required service area to discuss the technical details of proposed projects. Iowa State University requestors need to bring an Intramural Purchase Order (IPO) with them from their departmental office to request services. After the technical details of the project are known, a cost estimate is prepared. Ames Laboratory operations work less than $1,000 is submitted directly to the shop using the Engineering Services Shop -

  18. AEO2016 Electricity Working Group

    Gasoline and Diesel Fuel Update (EIA)

    Office of Electricity, Coal, Nuclear, and Renewables Analysis December 8, 2015 | Washington, DC AEO2016 Electricity Working Group WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE What to look for: Electricity sector in AEO2016 * Inclusion of EPA final Clean Power Plan in Reference Case * Updated cost estimates for new generating technologies * Major data update on existing coal plant status: MATS- compliant technology or retirement

  19. HEADQUARTERS MEDIATION PROGRAM MEDIATION WORKS!

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HEADQUARTERS MEDIATION PROGRAM MEDIATION WORKS! Mediation helps to build relationships. People solve their own problems by looking to the future, rather than finding fault with the past. YOU (the participant involved) make the decisions. * Mediation often works in conjunction with other dispute resolution processes, such as grievances or equal employment opportunity (EEO) complaints. However, mediation does NOT forestall established timeframes within those processes, nor does it constitute legal

  20. HEADQUARTERS MEDIATION PROGRAM MEDIATION WORKS!

    Energy Savers [EERE]

    HEADQUARTERS MEDIATION PROGRAM MEDIATION WORKS! Mediation helps to strengthen relationships. People solve their own problems by looking to the future, rather than finding fault with the past. YOU (the participant involved) make the decisions. * Mediation often works in conjunction with other dispute resolution processes, such as grievances or equal employment opportunity (EEO) complaints. However, mediation does NOT forestall established timeframes within those processes, nor does it constitute

  1. focused ion beam cross-sectioning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    focused ion beam cross-sectioning - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  2. Clean Water Act (excluding Section 404)

    SciTech Connect (OSTI)

    Not Available

    1993-01-15

    This Reference Book contains a current copy of the Clean Water Act (excluding Section 404) and those regulations that implement the statutes and appear to be most relevant to US Department of Energy (DOE) activities. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. Updates that include important new requirements will be provided periodically. Questions concerning this Reference Book may be directed to Mark Petts, EH-231 (202/586-2609).

  3. Quality Quantification of Evaluated Cross Section Covariances

    SciTech Connect (OSTI)

    Varet, S.; Dossantos-Uzarralde, P.

    2015-01-15

    Presently, several methods are used to estimate the covariance matrix of evaluated nuclear cross sections. Because the resulting covariance matrices can be different according to the method used and according to the assumptions of the method, we propose a general and objective approach to quantify the quality of the covariance estimation for evaluated cross sections. The first step consists in defining an objective criterion. The second step is computation of the criterion. In this paper the Kullback-Leibler distance is proposed for the quality quantification of a covariance matrix estimation and its inverse. It is based on the distance to the true covariance matrix. A method based on the bootstrap is presented for the estimation of this criterion, which can be applied with most methods for covariance matrix estimation and without the knowledge of the true covariance matrix. The full approach is illustrated on the {sup 85}Rb nucleus evaluations and the results are then used for a discussion on scoring and Monte Carlo approaches for covariance matrix estimation of the cross section evaluations.

  4. Major developments in section 404-permitting

    SciTech Connect (OSTI)

    Ahrens, M.; Orr, S.

    2009-06-15

    Mountain coal mining in the Central Appalachians faces increased challenge under the Clean Water Act (CWA). These challenges have included the US Environmental Protection Agency's (EPA) increased involvement in permitting under Section 404 of the CWA; active opposition by environmental groups to Section 404 permits; and proposed federal legislation to reduce the availability of these permits. These recent challenges culminated in a June 11, 2009, Memorandum of Understanding (MoU) between the PEA, the Department of Interior (DoI) and the Army Corps of Engineers (Corps) that will limit the use of general permits for mountaintop coal mining and increase the scrutiny applied to individual permits, while also providing a coordinated approach for reviewing the backlog of pending permit application. By entering into the MoU, the federal agencies aim to reduce the environmental impacts of mountaintop coal mining while increasing certainty and transparency for permit applications. Challenges to Section 404 permitting for mountaintop coal mining are dynamic and new developments occur almost daily. This article provides a snapshot of the current climate.

  5. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | NRC Officials Visit WIPP Tod A weekly e-newsletter for the Waste Isolation Pilot Plant team September 25, 2003 The Big Story Recertification - a work in progress Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-25-03 at 7:16 a.m.) 21 Shipments

  6. Work for Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-24

    Work for Others is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1B. Certified 1-13-11. Admin Chg 1, dated 3-14-11, cancels DOE O 481.1C. Admin Chg 2, dated 3-9-15, cancels DOE O 481.1C Admin Chg 1

  7. TEC Working Group Topic Groups Manual Review Key Documents | Department of

    Energy Savers [EERE]

    Energy Manual Review Key Documents TEC Working Group Topic Groups Manual Review Key Documents Key Documents PDF icon Transportation Practices Manual (DOE M 460) - March 8, 2006 More Documents & Publications DOE Shipment Activities: What We Accomplished and a Look Forward TEC Working Group Topic Groups Section 180(c) Key Documents TEC Working Group Topic Groups Rail Key Documents

  8. Clean Water Act (Section 404) and Rivers and Harbors Act (Sections 9 and 10)

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    This Reference Book contains a current copy of the Clean Water Act (Section 404) and the Rivers and Harbors Act (Sections 9 and 10) and those regulations that implement those sections of the statutes and appear to be most relevant to DOE activities. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. Updates that include important new requirements will be provided periodically. Questions concerning this Reference Book may be directed to Mark Petts, IH-231 (FTS 896-2609 or Commercial 202/586-2609).

  9. Contract No. DE-AC02-09CH11466 Section F

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modification No. 0164 Contract No. DE-AC02-09CH11466 Section F i PART I SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS CLAUSE NO. TITLE OF CLAUSE F.1 PERIOD OF PERFORMANCE (Revised by Prime Contract Modification 041 - 07/13/2010; 0137 - 10/28/2013; 0164 - 08/07/2014) F.2 AWARD TERM INCENTIVE (SPECIAL) F.3 FAR 52.242-15 - STOP WORK ORDER (AUG 1989) ALTERNATE I (APR 1984) F.4 STOP WORK AND SHUTDOWN AUTHORITY F.5 PRINCIPAL PLACE OF PERFORMANCE Modification No. 0164 Contract No.

  10. Coiled tubing working life prediction

    SciTech Connect (OSTI)

    Wu, J.

    1995-12-31

    Failure of coiled tubing, due to the repeated bending and plastic deformation of coiled tubing on and off the reel and gooseneck, is of great concern in coiled tubing operations. This paper discusses the coiled tubing working life based on one of the coiled tubing life models published in the literature, and compares the results with other models. Certain agreements are found among these models. A group of curves is presented to illustrate the coiled tubing working life affected by coiled tubing size and wall thickness, internal pressure, yield strength, reel diameter, gooseneck radius, operation condition (corrosion) and butt-welded connection (stress concentration). The results show that coiled tubing life can be greatly increased by increasing CT wall thickness and CT strength, while the coiled tubing working life decreases under high internal pressure, corrosion, and butt-weld conditions. These curves can be easily used in estimating coiled tubing life for the field use.

  11. CFCC working group meeting: Proceedings

    SciTech Connect (OSTI)

    1997-12-31

    This report is a compilation of the vugraphs presented at this meeting. Presentations covered are: CFCC Working Group; Overview of study on applications for advanced ceramics in industries for the future; Design codes and data bases: The CFCC program and its involvement in ASTM, ISO, ASME, and military handbook 17 activities; CFCC Working Group meeting (McDermott Technology); CFCC Working Group meeting (Textron); CFCC program for DMO materials; Developments in PIP-derived CFCCs; Toughened Silcomp (SiC-Si) composites for gas turbine engine applications; CFCC program for CVI materials; Self-lubricating CFCCs for diesel engine applications; Overview of the CFCC program`s supporting technologies task; Life prediction methodologies for CFCC components; Environmental testing of CFCCs in combustion gas environments; High-temperature particle filtration ORNL/DCC CRADA; HSCT CMC combustor; and Case study -- CFCC shroud for industrial gas turbines.

  12. Demolition Begins at K-25's Last Section Standing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Begins at K-25's Last Section Standing Demolition Begins at K-25's Last Section Standing September 27, 2013 - 12:00pm Addthis Oak Ridge, Tenn. - Demolition work began today at the last section standing of the K-25 building at the East Tennessee Technology Park (ETTP). Workers began tearing down the final six units of the mile-long Manhattan Project-era gaseous diffusion building that once was the largest building under one roof in the world. The original building was in the shape of a U. The

  13. Contract No. DE-AC02-07CH11358 Section E Contract Modification No. 133

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E Contract Modification No. 133 i PART I SECTION E INSPECTION AND ACCEPTANCE PAGE NO. E.1 - FAR 52.246-9 - INSPECTION OF RESEARCH AND DEVELOPMENT (SHORT FORM) (APR 1984) E-1 E.2 - CERTIFICATION E-1 Contract No. DE-AC02-07CH11358 Section E Contract Modification No.133 E-1 PART I SECTION E - INSPECTION AND ACCEPTANCE E.1 - FAR 52.246-9 - INSPECTION OF RESEARCH AND DEVELOPMENT (SHORT FORM) (APR 1984) The Government has the right to inspect and evaluate the work performed or being performed under

  14. Microsoft Word - DE-AC06-09RL15009 Section D.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Page D-1 Section D Packaging and Marking Table of Contents Section Title Page No. D.1 Packaging D-2 D.2 Marking D-2 Workers' Compensation Claims Services Part I Contract No. DE-AC06-09RL15009 Section D Page D-2 D.1 Packaging Preservation, packaging, and packing for shipment or mailing of all work delivered hereunder shall be in accordance with good commercial practices and adequate to ensure acceptance by common carrier and safe transportation at the most economical rate(s). D.2 Marking a.

  15. SECTION IV. ATOMIC AND MOLECULAR SCIENCE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IV. ATOMIC AND MOLECULAR SCIENCE Cross Sections for Cu K-Vacancy Production in Fast Heavy Ion Collisions R.L. Watson, J.M. Blackadar and V. Horvat Enhancement of the Cu Kα x-ray Diagram Lines in Fast Heavy Ion Collisions R.L. Watson, V. Horvat and J.M. Blackadar K-shell Ionization by Secondary Electrons V. Horvat, R.L. Watson and J.M. Blackadar Target-atom Inner-shell Vacancy Distributions Created in Collisions with Heavy Ion Projectiles V. Horvat, R.L. Watson and J.M. Blackadar Systematics of

  16. Consent Order of Dismissal, Section III

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SRR-ESH-2015-00110 Revision 1 Post Date: February 29, 2016 Page 1 of 6 Z-Area Saltstone Disposal Facility Permit General Condition B.5.a-h Information and Consent Order of Dismissal, Section III.7 Permit Condition Requirement Estimated Value Updated Value Comments B.5 a) Cumulative process volume of salt waste disposed to date Not Applicable 10, 722 kgal Vault 4, Cells B, D, E, F, H, J, K, L SDU 2, Cells 2A and 2B SDU 5, Cells 5A and 5B b) Process volume of saltstone grout disposed and

  17. Consent Order of Dismissal, Section III

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SRR-ESH-2016-00025 Revision 0 Post Date: February 29, 2016 Page 1 of 6 Z-Area Saltstone Disposal Facility Permit General Condition B.5.a-h Information and Consent Order of Dismissal, Section III.7 Permit Condition Requirement Estimated Value Updated Value Comments B.5 a) Cumulative process volume of salt waste disposed to date Not Applicable 10, 744 kgal SDU 4, Cells B, D, E, F, H, J, K, L SDU 2, Cells A and B SDU 5, Cells A and B b) Process volume of saltstone grout disposed and

  18. Cross Sections for Nuclei A = 3 - 20

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cross Sections with Proton and Alpha Induced Reactions for Nuclei A = 3 - 20 I. Introduction: We have scanned the NSR from 1910-present for various articles with proton and alpha induced reactions. We have used the program Plot Digitizer 2.5.0 to extract the excitation functions from figures in the articles. In some cases the uncertainties are provided in the figures, we have noted this in comments, but we have made no attempt to extract the uncertainties. In cases where the data are given in

  19. Microsoft Word - Section 5 September 2007.doc

    Office of Legacy Management (LM)

    Project Schedules and Milestones September 2007 Site Management Plan Page 5-1 5.0 Project Schedules and Milestones (FY 2008-2010) 5.1 Establishing Project Schedules and Milestones As stated in Section 1.1.2, the SMP establishes the overall plan for remedial actions at the MMTS and milestones against which progress can be measured. The SMP also documents the overall plan for remedial actions at the MVP Site, which was deleted from the NPL on February 28, 2000. The SMP was first prepared in 1995

  20. Long working distance interference microscope

    DOE Patents [OSTI]

    Sinclair, Michael B.; DeBoer, Maarten P.; Smith, Norman F.

    2004-04-13

    Disclosed is a long working distance interference microscope suitable for three-dimensional imaging and metrology of MEMS devices and test structures on a standard microelectronics probe station. The long working distance of 10-30 mm allows standard probes or probe cards to be used. This enables nanometer-scale 3-D height profiles of MEMS test structures to be acquired across an entire wafer. A well-matched pair of reference/sample objectives is not required, significantly reducing the cost of this microscope, as compared to a Linnik microinterferometer.

  1. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Access to Work Onsite Print The following process MUST be completed online by new and returning users at least TWO WEEKS prior to arrival at the ALS. Not a U.S. citizen? Please look at Documents for Foreign Nationals well ahead of your visit. Bring all relevant documents to the ALS in order to complete your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to work at the ALS, a process which can take 4-6 months to

  2. Get Access to Work Onsite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Get Access to Work Onsite Print The following process MUST be completed online by new and returning users at least TWO WEEKS prior to arrival at the ALS. Not a U.S. citizen? Please look at Documents for Foreign Nationals well ahead of your visit. Bring all relevant documents to the ALS in order to complete your registration. NOTE: Users who are citizens of, or were born in, T4 countries (Cuba, Iran, Sudan, and Syria) need DOE permission to work at the ALS, a process which can take 4-6 months to

  3. Cross section standards for neutron-induced gamma-ray production in the MeV energy range.

    SciTech Connect (OSTI)

    Nelson, R. O. (Ronald O.); Fotiadis, N. (Nikolaos); Devlin, M. J. (Matthew J.); Becker, J. A. (John A.); Garrett, P. E. (Paul E.); Younes, W. (Walid)

    2004-01-01

    Gamma-ray cross section standards for neutron-induced reactions are important in enabling the accurate determination of absolute cross sections from relative measurements of gamma-ray production. In our work we observed a need for improvement in these standards. In particular there are large discrepancies between evaluations of the {sup nat}Fe(n,n{sub 1}'{gamma}) cross section for the 847-keV gamma ray. We have performed (1) absolute cross section measurements, (2) measurements relative to the {sup nat}Cr(n,n{sub 1}'{gamma}) 1434-keV gamma ray, and (3) comparisons using measured total and elastic scattering cross sections to refine our knowledge of the Fe cross section and the closely linked inelastic channel cross section for Fe. Calculation of integral tests of the cross section libraries may indicate that adjustment of the angular distributions of the neutron elastic and inelastic scattering may be needed.

  4. Actinide Targets for Neutron Cross Section Measurements

    SciTech Connect (OSTI)

    John D. Baker; Christopher A. McGrath

    2006-10-01

    The Advanced Fuel Cycle Initiative (AFCI) and the Generation IV Reactor Initiative have demonstrated a lack of detailed neutron cross-sections for certain "minor" actinides, those other than the most common (235U, 238U, and 239Pu). For some closed-fuel-cycle reactor designs more than 50% of reactivity will, at some point, be derived from "minor" actinides that currently have poorly known or in some cases not measured (n,?) and (n,f) cross sections. A program of measurements under AFCI has begun to correct this. One of the initial hurdles has been to produce well-characterized, highly isotopically enriched, and chemically pure actinide targets on thin backings. Using a combination of resurrected techniques and new developments, we have made a series of targets including highly enriched 239Pu, 240Pu, and 242Pu. Thus far, we have electrodeposited these actinide targets. In the future, we plan to study reductive distillation to achieve homogeneous, adherent targets on thin metal foils and polymer backings. As we move forward, separated isotopes become scarcer, and safety concerns become greater. The chemical purification and electodeposition techniques will be described.

  5. Federal Utility Partnership Working Group

    Broader source: Energy.gov [DOE]

    The Federal Utility Partnership Working Group (FUPWG) establishes partnerships and facilitates communications among Federal agencies, utilities, and energy service companies. The group develops strategies to implement cost-effective energy efficiency and water conservation projects through utility incentive programs at Federal sites.

  6. MOX Cross-Section Libraries for ORIGEN-ARP

    SciTech Connect (OSTI)

    Gauld, I.C.

    2003-07-01

    The use of mixed-oxide (MOX) fuel in commercial nuclear power reactors operated in Europe has expanded rapidly over the past decade. The predicted characteristics of MOX fuel such as the nuclide inventories, thermal power from decay heat, and radiation sources are required for design and safety evaluations, and can provide valuable information for non-destructive safeguards verification activities. This report describes the development of computational methods and cross-section libraries suitable for the analysis of irradiated MOX fuel with the widely-used and recognized ORIGEN-ARP isotope generation and depletion code of the SCALE (Standardized Computer Analyses for Licensing Evaluation) code system. The MOX libraries are designed to be used with the Automatic Rapid Processing (ARP) module of SCALE that interpolates appropriate values of the cross sections from a database of parameterized cross-section libraries to create a problem-dependent library for the burnup analysis. The methods in ORIGEN-ARP, originally designed for uranium-based fuels only, have been significantly upgraded to handle the larger number of interpolation parameters associated with MOX fuels. The new methods have been incorporated in a new version of the ARP code that can generate libraries for low-enriched uranium (LEU) and MOX fuel types. The MOX data libraries and interpolation algorithms in ORIGEN-ARP have been verified using a database of declared isotopic concentrations for 1042 European MOX fuel assemblies. The methods and data are validated using a numerical MOX fuel benchmark established by the Organization for Economic Cooperation and Development (OECD) Working Group on burnup credit and nuclide assay measurements for irradiated MOX fuel performed as part of the Belgonucleaire ARIANE International Program.

  7. Neutron cross section standards and instrumentation. Annual report

    SciTech Connect (OSTI)

    Wasson, O.A.

    1993-07-01

    The objective of this interagency program is to provide accurate neutron interaction measurements for the US Department of Energy nuclear programs which include waste disposal, fusion, safeguards, defense, fission, and personnel protection. These measurements are also useful to other energy programs which indirectly use the unique properties of the neutron for diagnostic and analytical purposes. The work includes the measurement of reference cross sections and related neutron data employing unique facilities and capabilities at NIST and other laboratories as required; leadership and participation in international intercomparisons and collaborations; the preservation of standard reference deposits and the development of improved neutron detectors and measurement methods. A related and essential element of the program is critical evaluation of neutron interaction data including international coordinations. Data testing of critical data for important applications is included. The program is jointly supported by the Department of Energy and the National Institute of Standards and Technology. This report from the National Institute of Standards and Technology contains a summary of the accomplishments of the Neutron Cross Section Standards and Instrumentation Project during the third year of this three-year interagency agreement. The proposed program and required budget for the following three years are also presented. The program continues the shifts in priority instituted in order to broaden the program base.

  8. Research on Fast-Doppler-Broadening of neutron cross sections

    SciTech Connect (OSTI)

    Li, S.; Wang, K.; Yu, G.

    2012-07-01

    A Fast-Doppler-Broadening method is developed in this work to broaden Continuous Energy neutron cross-sections for Monte Carlo calculations. Gauss integration algorithm and parallel computing are implemented in this method, which is unprecedented in the history of cross section processing. Compared to the traditional code (NJOY, SIGMA1, etc.), the new Fast-Doppler-Broadening method shows a remarkable speedup with keeping accuracy. The purpose of using Gauss integration is to avoid complex derivation of traditional broadening formula and heavy load of computing complementary error function that slows down the Doppler broadening process. The OpenMP environment is utilized in parallel computing which can take full advantage of modern multi-processor computers. Combination of the two can reduce processing time of main actinides (such as {sup 238}U, {sup 235}U) to an order of magnitude of 1{approx}2 seconds. This new method is fast enough to be applied to Online Doppler broadening. It can be combined or coupled with Monte Carlo transport code to solve temperature dependent problems and neutronics-thermal hydraulics coupled scheme which is a big challenge for the conventional NJOY-MCNP system. Examples are shown to determine the efficiency and relative errors compared with the NJOY results. A Godiva Benchmark is also used in order to test the ACE libraries produced by the new method. (authors)

  9. Waste Contaminants at Military Bases Working Group report

    SciTech Connect (OSTI)

    Not Available

    1993-11-04

    The Waste Contaminants at Military Bases Working Group has screened six prospective demonstration projects for consideration by the Federal Advisory Committee to Develop On-Site Innovative Technologies (DOIT). These projects include the Kirtland Air Force Base Demonstration Project, the March Air Force Base Demonstration Project, the McClellan Air Force Base Demonstration Project, the Williams Air Force Base Demonstration Project, and two demonstration projects under the Air Force Center for Environmental Excellence. A seventh project (Port Hueneme Naval Construction Battalion Center) was added to list of prospective demonstrations after the September 1993 Working Group Meeting. This demonstration project has not been screened by the working group. Two additional Air Force remediation programs are also under consideration and are described in Section 6 of this document. The following information on prospective demonstrations was collected by the Waste Contaminants at Military Bases Working Group to assist the DOIT Committee in making Phase 1 Demonstration Project recommendations. The remainder of this report is organized into seven sections: Work Group Charter`s mission and vision; contamination problems, current technology limitations, and institutional and regulatory barriers to technology development and commercialization, and work force issues; screening process for initial Phase 1 demonstration technologies and sites; demonstration descriptions -- good matches;demonstration descriptions -- close matches; additional candidate demonstration projects; and next steps.

  10. History of Met Lab Section C-I, May 1945 to May 1946

    SciTech Connect (OSTI)

    Seaborg, G.T.

    1980-06-01

    This is the final volume of a history of the research work of Seaborg and associates in the University of Chicago Metallurgical Laboratory, Chemistry Section C-1. The work was concerned with the development of chemical procedures for the extraction of plutonium, for the purification of plutonium and, in the later phases, for research on the isotopes of other heavy elements including other transuranium elements. The style of the history is that of a diary with footnotes giving additional information.

  11. ACME solar works | Open Energy Information

    Open Energy Info (EERE)

    ACME solar works Jump to: navigation, search Logo: ACME solar works Name: ACME solar works Address: 20738 Brown Lane Place: Summerdale, Alabama Zip: 36580 Sector: Solar Product:...

  12. Working Gas in Underground Storage Figure

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Working Gas in Underground Storage Figure Working Gas in Underground Storage Figure Working Gas in Underground Storage Compared with 5-Year Range Graph....

  13. LotusWorks | Open Energy Information

    Open Energy Info (EERE)

    LotusWorks Jump to: navigation, search Name: LotusWorks Place: Ireland Product: Engineering, technical and construction management service provider. References: LotusWorks1 This...

  14. Federal Utility Partnership Working Group Meeting: Washington...

    Energy Savers [EERE]

    Utility Partnership Working Group Meeting: Washington Update Federal Utility Partnership Working Group Meeting: Washington Update Federal Utility Partnership Working Group Meeting:...

  15. Lawrence Livermore National Laboratory Working Reference Material Production Pla

    SciTech Connect (OSTI)

    Amy Wong; Denise Thronas; Robert Marshall

    1998-11-04

    This Lawrence Livermore National Laboratory (LLNL) Working Reference Material Production Plan was written for LLNL by the Los Alamos National Laboratory to address key elements of producing seven Pu-diatomaceous earth NDA Working Reference Materials (WRMS). These WRMS contain low burnup Pu ranging in mass from 0.1 grams to 68 grams. The composite Pu mass of the seven WRMS was designed to approximate the maximum TRU allowable loading of 200 grams Pu. This document serves two purposes: first, it defines all the operations required to meet the LLNL Statement of Work quality objectives, and second, it provides a record of the production and certification of the WRMS. Guidance provided in ASTM Standard Guide C1128-89 was used to ensure that this Plan addressed all the required elements for producing and certifying Working Reference Materials. The Production Plan was written to provide a general description of the processes, steps, files, quality control, and certification measures that were taken to produce the WRMS. The Plan identifies the files where detailed procedures, data, quality control, and certification documentation and forms are retained. The Production Plan is organized into three parts: a) an initial section describing the preparation and characterization of the Pu02 and diatomaceous earth materials, b) middle sections describing the loading, encapsulation, and measurement on the encapsulated WRMS, and c) final sections describing the calculations of the Pu, Am, and alpha activity for the WRMS and the uncertainties associated with these quantities.

  16. Recommendations: Draft 2008 Section 999 Annual Plan | Department of Energy

    Energy Savers [EERE]

    8 Section 999 Annual Plan Recommendations: Draft 2008 Section 999 Annual Plan PDF icon UDAC Recommendations on Draft 2008 Section 999 Annual Plan More Documents & Publications UDAC Meeting - October 15, 2008 UDAC Meeting - July 2007 UDAC Meeting - February 2011

  17. Recommendations: Draft 2011 Section 999 Annual Plan | Department of Energy

    Energy Savers [EERE]

    1 Section 999 Annual Plan Recommendations: Draft 2011 Section 999 Annual Plan PDF icon UDAC Recommendations on Draft 2011 Section 999 Annual Plan More Documents & Publications Recommendations: Draft 2012 Annual Plan UDAC Next Steps UDAC Meeting - February 2011

  18. Apparatus for sectioning demountable semiconductor samples

    DOE Patents [OSTI]

    Sopori, Bhushan L. (Scottsdale, AZ); Wolf, Abraham (Sun City West, AZ)

    1984-01-01

    Apparatus for use during polishing and sectioning operations of a ribbon sample is described. The sample holder includes a cylinder having an axially extending sample cavity terminated in a first funnel-shaped opening and a second slot-like opening. A spring-loaded pressure plunger is located adjacent the second opening of the sample cavity for frictional engagement of the sample prior to introduction of a molding medium in the sample cavity. A heat softenable molding medium is inserted in the funnel-shaped opening, to surround the sample. After polishing, the heater is energized to allow draining of the molding medium from the sample cavity. During manual polishing, the second end of the sample holder is inserted in a support ring which provides mechanical support as well as alignment of the sample holder during polishing. A gauge block for measuring the protrusion of a sample beyond the second wall of the holder is also disclosed.

  19. Apparatus for sectioning demountable semiconductor samples

    DOE Patents [OSTI]

    Sopori, B.L.; Wolf, A.

    1984-01-01

    Apparatus for use during polishing and sectioning operations of a ribbon sample is described. The sample holder includes a cylinder having an axially extending sample cavity terminated in a first funnel-shaped opening and a second slot-like opening. A spring-loaded pressure plunger is located adjacent the second opening of the sample cavity for frictional engagement of the sample cavity. A heat softenable molding medium is inserted in the funnel-shaped opening, to surround the sample. After polishing, the heater is energized to allow draining of the molding medium from the sample cavity. During manual polishing, the second end of the sample holder is inserted in a support ring which provides mechanical support as well as alignment of the sample holder during polishing. A gauge block for measuring the protrusion of a sample beyond the second wall of the holder is also disclosed.

  20. Sandia Energy - UFD Working Group 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UFD Working Group 2015 Home Stationary Power Nuclear Fuel Cycle Nuclear Energy Workshops UFD Working Group 2015 UFD Working Group 2015lmays2015-07-06T17:21:43+00:00 UFD WORKING...

  1. Advisory Council on Historic Preservation - Section 106 Regulations...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Advisory Council on Historic Preservation - Section 106 RegulationsLegal Abstract Section 106 requires...

  2. Category:Hydropower Regulatory Roadmap Sections | Open Energy...

    Open Energy Info (EERE)

    Community Login | Sign Up Search Category Edit History Category:Hydropower Regulatory Roadmap Sections Jump to: navigation, search RAPID Toolkit Add.png Add a Section Pages in...

  3. 2013 Electrical Production: EPAct 2005 Section 242 Hydroelectric...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production: EPAct 2005 Section 242 Hydroelectric Incentive Program 2013 Electrical Production: EPAct 2005 Section 242 Hydroelectric Incentive Program In 2014, Congress ...

  4. Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive Program Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive Program This document contains the Final ...

  5. 2014 ELECTRICAL PRODUCTION: EPACT 2005 SECTION 242 HYDROELECTRIC...

    Office of Environmental Management (EM)

    ELECTRICAL PRODUCTION: EPACT 2005 SECTION 242 HYDROELECTRIC INCENTIVE PROGRAM 2014 ELECTRICAL PRODUCTION: EPACT 2005 SECTION 242 HYDROELECTRIC INCENTIVE PROGRAM In 2015, Congress ...

  6. Idaho Section 319 Grant Application | Open Energy Information

    Open Energy Info (EERE)

    to library Form: Idaho Section 319 Grant Application Abstract This page provides access to an online form Section 319 Project Application for grants for watershed and aquifer...

  7. EPA Coastal Zone Act Reauthorization Amendments (CZARA) Section...

    Open Energy Info (EERE)

    Section 6217 Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA Coastal Zone Act Reauthorization Amendments (CZARA) Section 6217 Webpage...

  8. EPA Section 401 Water Quality Certification Manual | Open Energy...

    Open Energy Info (EERE)

    Section 401 Water Quality Certification Manual Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: EPA Section 401 Water Quality Certification Manual...

  9. Hawaii DOH Hazardous Waste Section Webpage | Open Energy Information

    Open Energy Info (EERE)

    Hazardous Waste Section Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii DOH Hazardous Waste Section Webpage Abstract This webpage...

  10. Working with SRNL - Technology Partnerships

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19/2015 SEARCH SRNL GO SRNL Home SRNL Contacts Media Contacts For information about the Savannah River National Laboratory, contact: Will Callicott, Manager SRNL Executive Communications will.callicott@srnl.doe.gov 803-725-3786 Lana Patterson, Communications Coordinator SRNL Executive Communications lana.patterson@srnl.doe.gov 803-725-4396 Technology Transfer For information on working with SRNL in the development and use of new technology, contact: Dale Haas, Manager (Acting) Partnerships and

  11. Production work up for grabs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    work up for grabs Los Alamos continued in turmoil and scientists kept leaving. The Operation Crossroads effort had dealt the laboratory a tremendous blow as the demands for production seemed to override any scientific research and development. On September 24, 1946, John H. Manley wrote General Groves a letter as noted in Hewlett and Anderson's The New World. The letter said, in part, that Los Alamos was unable to maintain the position the United States had advertised before the world regarding

  12. Renewable Electricity Working Group Presentation

    U.S. Energy Information Administration (EIA) Indexed Site

    Renewable Electricity Working Group Chris Namovicz, Renewable Electricity Analysis Team July 9, 2013 Agenda * Review status of AEO 2013 * Discuss new model updates and development efforts for AEO 2014 and future AEOs - Model updates - Policy updates - Planned additions updates - Performance updates * Obtain feedback from stakeholders on any key items that EIA should look at Chris Namovicz, July 9 2 Status of AEO 2013 Chris Namovicz, July 9 * AEO 2013 was released in stages this year - Reference

  13. http://bellview/TeamWorks/TRUTeamWorks.PDF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thursday, 9/4/03 | Total shipments received at WIPP: 1,978 | Shipments expected this week: Hanford (2), LA A weekly e-newsletter for the Waste Isolation Pilot Plant team September 4, 2003 The Big Story Get ready, set, go for 100 Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e

  14. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15/04 Shipments expected this week: Hanford (2), NTS (2), RFETS (11), SRS (6) January 15, 2004 The Big Story Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 1/15/04 at 7:09 a.m. Shipments scheduled to arrive at WIPP this week 21 Total shipments

  15. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/04 Shipments expected this week: Hanford (3), NTS (2), RFETS (11), SRS (6) January 22, 2004 The Big Story Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 1/22/04 at 7:22 a.m. Shipments scheduled to arrive at WIPP this week 22 Total shipments

  16. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9/04 Shipments expected this week: NTS (2), RFETS (13), SRS (6) January 29, 2004 The Big Story WTS restructures workforce Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 1/29/04 at 7:14 a.m.) Shipments scheduled to arrive at WIPP this week 21 Total

  17. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A weekly e-newsletter for the Waste Isolation Pilot Plant team September 18, 2003 The Big Story Characterization Operations completed at ANL-E Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-18-03 at 7:17 a.m.) 21 Shipments scheduled to arrive

  18. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    /03 | Shipments expected this week: Hanford (1), RFETS (11), SRS (6) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 2, 2003 The Big Story Laboratory setup at CEMRC is teamwork in action Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP

  19. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16/03 | Shipments expected this week: ANL-E (2) , RFETS (11), SRS (6) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 16, 2003 The Big Story EM-6 to review WIPP baseline Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of

  20. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3/03 | Shipments expected this week: RFETS (11), SRS (4), Hanford (2) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 23, 2003 Sealed sources: questions and answers Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 10/23/03

  1. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    13/03 | Shipments expected this week: RFETS (11), SRS (6) | WIPP welcomes new CBFO Deputy Ma A weekly e-newsletter for the Waste Isolation Pilot Plant team November 13, 2003 The Big Story Farewell to a leader Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP

  2. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    20/03 | Shipments expected this week: Hanford (2), RFETS (14), SRS (6) | A weekly e-newsletter for the Waste Isolation Pilot Plant team November 20, 2003 The Big Story WIPP welcomes Lloyd Piper Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of

  3. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    04/03 | Shipments expected this week: Hanford (2), RFETS (11), SRS (3) | December 4, 2003 The Big Story H.R.2754 to usher in change Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 12/4/03 at 8:05 a.m.) Shipments scheduled to arrive at WIPP this

  4. http://bellview/TeamWorks/TRUTeamWorks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1/03 | Shipments expected this week: Hanford (2), RFETS (11), SRS (3) | December 11, 2003 The Big Story Standardization - a cost saving innovation Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e- mail. WIPP Shipments (as of 12/11/03 at 7:47 a.m.) Shipments scheduled to arrive

  5. PROBLEM DEPENDENT DOPPLER BROADENING OF CONTINUOUS ENERGY CROSS SECTIONS IN THE KENO MONTE CARLO COMPUTER CODE

    SciTech Connect (OSTI)

    Hart, S. W. D.; Maldonado, G. Ivan; Celik, Cihangir; Leal, Luiz C

    2014-01-01

    For many Monte Carlo codes cross sections are generally only created at a set of predetermined temperatures. This causes an increase in error as one moves further and further away from these temperatures in the Monte Carlo model. This paper discusses recent progress in the Scale Monte Carlo module KENO to create problem dependent, Doppler broadened, cross sections. Currently only broadening the 1D cross sections and probability tables is addressed. The approach uses a finite difference method to calculate the temperature dependent cross-sections for the 1D data, and a simple linear-logarithmic interpolation in the square root of temperature for the probability tables. Work is also ongoing to address broadening theS (alpha , beta) tables. With the current approach the temperature dependent cross sections are Doppler broadened before transport starts, and, for all but a few isotopes, the impact on cross section loading is negligible. Results can be compared with those obtained by using multigroup libraries, as KENO currently does interpolation on the multigroup cross sections to determine temperature dependent cross-sections. Current results compare favorably with these expected results.

  6. Federal Utility Partnership Working Group Seminar: Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Seminar: Chairman's Corner Federal Utility Partnership Working Group Seminar: Chairman's Corner Presentation covers the Federal Utility Partnership Working Group Seminar:...

  7. How Gas Turbine Power Plants Work | Department of Energy

    Energy Savers [EERE]

    How Gas Turbine Power Plants Work How Gas Turbine Power Plants Work The combustion (gas) turbines being installed in many of today's natural-gas-fueled power plants are complex machines, but they basically involve three main sections: The compressor, which draws air into the engine, pressurizes it, and feeds it to the combustion chamber at speeds of hundreds of miles per hour. The combustion system, typically made up of a ring of fuel injectors that inject a steady stream of fuel into combustion

  8. Microsoft Word - WTP Contract Section G - Conformed Thru 353.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G Contract No. DE-AC27-01RV14136 Modification No. 353 G - i SECTION G CONTRACT ADMINISTRATION DATA WTP Contract Section G Contract No. DE-AC27-01RV14136 Modification No. 353 G - ii SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS Section Clause Page G.1 CORRESPONDENCE PROCEDURES ........................................................................................... 1 G.2 CONTRACT ADMINISTRATION

  9. SECTION L -ATTACHMENT B - LISTING OF KEY PERSONNEL

    National Nuclear Security Administration (NNSA)

    H SECTION J APPENDIX H KEY PERSONNEL [Note: To be inserted by the Contracting Officer after

  10. Recommendations: Draft 2007 Section 999 Annual Plan | Department of Energy

    Energy Savers [EERE]

    7 Section 999 Annual Plan Recommendations: Draft 2007 Section 999 Annual Plan PDF icon UDAC - Recommendations on Draft 2007 Section 999 Annual Plan More Documents & Publications Recommendations: Draft 2012 Annual Plan Recommendations: Draft 2008 Section 999 Annual Plan UDAC Meeting - July 2007

  11. Recommendations: Draft 2009 Section 999 Annual Plan | Department of Energy

    Energy Savers [EERE]

    09 Section 999 Annual Plan Recommendations: Draft 2009 Section 999 Annual Plan PDF icon UDAC Recommendations on Draft 2009 Section 999 Annual Plan More Documents & Publications Recommendations: Draft 2010 Section 999 Annual Plan Recommendations: Draft 2012 Annual Plan Recommendations: 2009

  12. Recommendations: Draft 2010 Section 999 Annual Plan | Department of Energy

    Energy Savers [EERE]

    10 Section 999 Annual Plan Recommendations: Draft 2010 Section 999 Annual Plan PDF icon UDAC - Recommendations on Draft 2010 Section 999 Annual Plan More Documents & Publications Recommendations: Draft 2009 Section 999 Annual Plan Recommendations: Draft 2012 Annual Plan Recommendations: Draft 2013

  13. Comments to Section 934 Rulemaking | Department of Energy

    Office of Environmental Management (EM)

    to Section 934 Rulemaking Comments to Section 934 Rulemaking ConverDyn's comments on section 934 rulemaking PDF icon Comments to Section 934 Rulemaking More Documents & Publications NOPR ConverDyn Memo to DOE re conference call minutes Public Comment re Convention on Supplementary Compensation for Nuclear Damage Contingent Cost Allocation

  14. Sandia National Laboratories: Working with Sandia: Contractor/Bidder

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information Contractor/Bidder Information Opportunities Potential Suppliers Current Suppliers Accounts Payable Contract Audit Contractor/Bidder Information Section II Terms and Conditions Construction and Facilities iSupplier Account IT Transformation Services Staff Augmentation What Does Sandia Buy? Working with Sandia Contractor/Bidder Information This contract library contains listings of forms; Environmental, Safety and Health (ES&H) requirements; and terms and conditions. The

  15. Mixed Waste Working Group report

    SciTech Connect (OSTI)

    Not Available

    1993-11-09

    The treatment of mixed waste remains one of this country`s most vexing environmental problems. Mixed waste is the combination of radioactive waste and hazardous waste, as defined by the Resource Conservation and Recovery Act (RCRA). The Department of Energy (DOE), as the country`s largest mixed waste generator, responsible for 95 percent of the Nation`s mixed waste volume, is now required to address a strict set of milestones under the Federal Facility Compliance Act of 1992. DOE`s earlier failure to adequately address the storage and treatment issues associated with mixed waste has led to a significant backlog of temporarily stored waste, significant quantities of buried waste, limited permanent disposal options, and inadequate treatment solutions. Between May and November of 1993, the Mixed Waste Working Group brought together stakeholders from around the Nation. Scientists, citizens, entrepreneurs, and bureaucrats convened in a series of forums to chart a course for accelerated testing of innovative mixed waste technologies. For the first time, a wide range of stakeholders were asked to examine new technologies that, if given the chance to be tested and evaluated, offer the prospect for better, safer, cheaper, and faster solutions to the mixed waste problem. In a matter of months, the Working Group has managed to bridge a gap between science and perception, engineer and citizen, and has developed a shared program for testing new technologies.

  16. Workforce Retention Work Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Retention Work Group Workforce Retention Work Group The Workforce Retention Work Group was established to collaboratively address the needs of the Department to maintain a skilled work force in the face of anticipated retirements and to address the specific health and safety concerns of that work force that could impede retention. Due to the broad nature of the issues reflected within this working group, the chartered objectives and outcomes have been moved forward to be worked by the

  17. Averaging cross section data so we can fit it

    SciTech Connect (OSTI)

    Brown, D.

    2014-10-23

    The 56Fe cross section we are interested in have a lot of fluctuations. We would like to fit the average of the cross section with cross sections calculated within EMPIRE. EMPIRE is a Hauser-Feshbach theory based nuclear reaction code, requires cross sections to be smoothed using a Lorentzian profile. The plan is to fit EMPIRE to these cross sections in the fast region (say above 500 keV).

  18. Exascale Hardware Architectures Working Group

    SciTech Connect (OSTI)

    Hemmert, S; Ang, J; Chiang, P; Carnes, B; Doerfler, D; Leininger, M; Dosanjh, S; Fields, P; Koch, K; Laros, J; Noe, J; Quinn, T; Torrellas, J; Vetter, J; Wampler, C; White, A

    2011-03-15

    The ASC Exascale Hardware Architecture working group is challenged to provide input on the following areas impacting the future use and usability of potential exascale computer systems: processor, memory, and interconnect architectures, as well as the power and resilience of these systems. Going forward, there are many challenging issues that will need to be addressed. First, power constraints in processor technologies will lead to steady increases in parallelism within a socket. Additionally, all cores may not be fully independent nor fully general purpose. Second, there is a clear trend toward less balanced machines, in terms of compute capability compared to memory and interconnect performance. In order to mitigate the memory issues, memory technologies will introduce 3D stacking, eventually moving on-socket and likely on-die, providing greatly increased bandwidth but unfortunately also likely providing smaller memory capacity per core. Off-socket memory, possibly in the form of non-volatile memory, will create a complex memory hierarchy. Third, communication energy will dominate the energy required to compute, such that interconnect power and bandwidth will have a significant impact. All of the above changes are driven by the need for greatly increased energy efficiency, as current technology will prove unsuitable for exascale, due to unsustainable power requirements of such a system. These changes will have the most significant impact on programming models and algorithms, but they will be felt across all layers of the machine. There is clear need to engage all ASC working groups in planning for how to deal with technological changes of this magnitude. The primary function of the Hardware Architecture Working Group is to facilitate codesign with hardware vendors to ensure future exascale platforms are capable of efficiently supporting the ASC applications, which in turn need to meet the mission needs of the NNSA Stockpile Stewardship Program. This issue is relatively immediate, as there is only a small window of opportunity to influence hardware design for 2018 machines. Given the short timeline a firm co-design methodology with vendors is of prime importance.

  19. Technical WOrk Plan for: Construction Effects Monitoring

    SciTech Connect (OSTI)

    S. Goodin

    2006-09-14

    This document is the technical work plan (TWP) for performing the Construction Effects Monitoring (CEM) activity, which is one of 20 testing and monitoring activities included in Performance Confirmation Plan (BSC 2004 [DIRS 172452]). Collectively, the 20 activities make up the Performance Confirmation Program described in the plan. Each of the other 19 activities will have a separate TWP. This plan, though titled Construction Effects Monitoring, in accordance with the Performance Confirmation Plan, also includes testing that may be performed in addition to monitoring, if required. Performance confirmation is required by regulation 10 CFR Part 63 [DIRS 173273], and was started during site characterization (consistent with the regulation) and will continue until permanent closure of the repository (10 CFR 63.13 1 (b) [DIRS 173273]). This CEM activity has two primary goals: (1) to collect, analyze, and report on repository rock properties data for the purpose of confirming geotechnical and design parameters used in repository design, and (2) to provide information intended to confirm that the ability to retrieve waste from the repository has been preserved. It will be necessary for information from this CEM activity to be evaluated in combination with that obtained from other Performance Confirmation Program activities to achieve these goals. These relationships with other Performance Confirmation Program activities (e.g., drift inspection, subsurface mapping, and seismicity monitoring) will be discussed in later sections of this TWP.

  20. Work Plan - U.S.-India Coal Working Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    PDF icon Work Plan - U.S.-India Coal Working Group More Documents & Publications Work Group Telecom (Draft Charters) U.S.-India Coal Working Group Terms of Reference Work Group Leadership Meetings: Transition Elements

  1. FY 1996 annual work plan

    SciTech Connect (OSTI)

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  2. Graduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive...

  3. Undergraduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive...

  4. SpringWorks | Open Energy Information

    Open Energy Info (EERE)

    SpringWorks Jump to: navigation, search Name: SpringWorks Place: Minnetonka, Minnesota Zip: 55343-8684 Product: SpringWorks was created to discover and nurture incubation companies...

  5. Working with Modules within Perl and Python

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Modules within Perl and Python Working with Modules within Perl and Python It can often be convenient to work with the modules system from within perl or python...

  6. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COUNCIL - WORK PLANNING FORMAT: Natural Gas Use in Transportation PDF icon RCC Workplan NGV.PDF More Documents & Publications REGULATORY COOPERATION COUNCIL - WORK PLANNING ...

  7. Peak Underground Working Natural Gas Storage Capacity

    Gasoline and Diesel Fuel Update (EIA)

    of capacity that may understate the amount that can actually be stored. Working Gas Design Capacity: This measure estimates a natural gas facility's working gas capacity, as...

  8. California Working Natural Gas Underground Storage Capacity ...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Working Natural Gas Underground Storage Capacity (Million Cubic Feet) California Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Year Jan Feb Mar Apr May Jun...

  9. Brad Foote Gear Works | Open Energy Information

    Open Energy Info (EERE)

    Brad Foote Gear Works Jump to: navigation, search Name: Brad Foote Gear Works Place: Cicero, Illinois Zip: 60804-1404 Sector: Wind energy Product: Gearing systems manufacturer...

  10. Federal Utility Partnership Working Group Utility Partners

    Broader source: Energy.gov [DOE]

    Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

  11. Washington Working Natural Gas Underground Storage Capacity ...

    Gasoline and Diesel Fuel Update (EIA)

    Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Washington Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Year Jan Feb Mar Apr May Jun...

  12. Mississippi Working Natural Gas Underground Storage Capacity...

    Gasoline and Diesel Fuel Update (EIA)

    Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Mississippi Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Year Jan Feb Mar Apr May Jun...

  13. Pennsylvania Working Natural Gas Underground Storage Capacity...

    Gasoline and Diesel Fuel Update (EIA)

    Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Pennsylvania Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Year Jan Feb Mar Apr May...

  14. Contact Us - Working With Us | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact Us - Working With Us Contact us to learn more about working with NREL. Your name (Required) Your email address (Required) Your telephone number Your organization Your role...

  15. Federal Utility Partnership Working Group Meeting Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Chairman's Corner Federal Utility Partnership Working Group Meeting Chairman's Corner Presentation-given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG)...

  16. Federal Utility Partnership Working Group Meeting: Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting: Chairman's Corner Federal Utility Partnership Working Group Meeting: Chairman's Corner Presentation-given at the April 2012 Federal Utility Partnership Working Group...

  17. Work & Life at Munich | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work & Life at Munich Work & Life at Munich Living at Germany's Cosmopolitan Crossroads offers easy access to outdoor pursuits in the Alps and travel throughout Europe. Click to...

  18. Current work in energy analysis

    SciTech Connect (OSTI)

    1998-03-01

    This report describes the work performed at Berkeley Lab most recently. One of the Labs accomplishments is the publication of Scenarios of US Carbon Reductions, an analysis of the potential of energy technologies to reduce carbon emissions in the US. This analysis is described and played a key role in shaping the US position on climate change in the Kyoto Protocol negotiations. The Labs participation in the fundamental characterization of the climate change issue by the IPCC is described. Described also is a study of leaking electricity, which is stimulating an international campaign for a one-watt ceiling for standby electricity losses from appliances. This ceiling has the potential to save two-thirds of the 5% of US residential electricity currently expended on standby losses. The 54 vignettes contained in the report summarize results of research activities ranging in scale from calculating the efficacy of individual lamp ballasts to estimating the cost-effectiveness of the national Energy Star{reg_sign} labeling program, and ranging in location from a scoping study of energy-efficiency market transformation in California to development of an energy-efficiency project in the auto parts industry in Shandong Province, China.

  19. Hadron Colliders Working Group Report

    SciTech Connect (OSTI)

    S. Peggs and M.J. Syphers

    2001-11-08

    The ''point design'' studied this year shows that a staged VLHC (40, {approx} 200 TeV) is feasible, with no insurmountable challenges. Further work can provide a more optimized design, by studying various alternative field strengths (e.g., superferric magnets for Stage 1) for improvements to vacuum, wall impedance, and other major performance parameters. It may be that a ''single-stage'' scenario for accessing higher energies sooner is the correct approach. A next-step design study should be considered to look at the two cases near to and complementary to the 2001 VLHC Design Study. The effectiveness of photon stops and their engineering design need to be addressed in the near future to truly determine if these devices can lead this effort to even higher luminosities and energies. The superbunch approach should continue to be studied, as well as IR designs, new instrumentation and diagnostics, and beam dynamics issues. Finally, a well organized VLHC-motivated beam studies effort should become part of the national program.

  20. Part II: Section B: Supplies, Services and Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    B SUPPLIES AND SERVICES AND PRICECOSTS DE-AC36-08GO28308 Modification M801 Section B - ii PART I SECTION B SUPPLIES AND SERVICES AND PRICECOSTS TABLE OF CONTENTS B.1 Service...

  1. California Fish and Game Code Section 86 | Open Energy Information

    Open Energy Info (EERE)

    California Fish and Game Code Section 86 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: California Fish and Game Code Section...

  2. Category:Regulatory Roadmap Sections | Open Energy Information

    Open Energy Info (EERE)

    Roadmap Sections Jump to: navigation, search GRR-logo.png Looking for the RAPIDRoadmap? Click here for a user-friendly list of Regulatory Roadmap pages. Add.png Add a Section...

  3. EPA EPCRA Section 304 Website | Open Energy Information

    Open Energy Info (EERE)

    Section 304 Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA EPCRA Section 304 Website Abstract This website explains Emergency Planning...

  4. Clean Water Act Section 303(d) Webpage | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Clean Water Act Section 303(d) Webpage Abstract This webpage provides an overview of Section...

  5. Idaho Clean Water Act Section 401 Certification Webpage | Open...

    Open Energy Info (EERE)

    Clean Water Act Section 401 Certification Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho Clean Water Act Section 401 Certification...

  6. _PART I - THE SCHEDULE SECTION B-H

    National Nuclear Security Administration (NNSA)

    to Mod 0108 dated 7/30/15 DE-NA0000622 Section B - H, Page i PART I - THE SCHEDULE TABLE OF CONTENTS SECTION B ............................................................................................................................................................ 1 SUPPLIES OR SERVICES AND PRICES/COSTS .............................................................................................. 1 B-1 SERVICES BEING ACQUIRED

  7. Alaska Request for SHPO Section 106 Review | Open Energy Information

    Open Energy Info (EERE)

    Alaska Request for SHPO Section 106 Review Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Alaska Request for SHPO Section 106 Review Form Type...

  8. Experiments on Antiprotons: Antiproton-Nucleon Cross Sections

    DOE R&D Accomplishments [OSTI]

    Chamberlain, Owen; Keller, Donald V.; Mermond, Ronald; Segre, Emilio; Steiner, Herbert M.; Ypsilantis, Tom

    1957-07-22

    In this paper experiments are reported on annihilation and scattering of antiprotons in H{sub 2}O , D{sub 2}O, and O{sub 2}. From the data measured it is possible to obtain an antiproton-proton and an antiproton-deuteron cross section at 457 Mev (lab). Further analysis gives the p-p and p-n cross sections as 104 mb for the p-p reaction cross section and 113 mb for the p-n reaction cross section. The respective annihilation cross sections are 89 and 74 mb. The Glauber correction necessary in order to pass from the p-d to the p-n cross section by subtraction of the p-p cross section is unfortunately large and somewhat uncertain. The data are compared with the p-p and p-n cross sections and with other results on p-p collisions.

  9. Draft Report to Congress: Energy Policy Act of 2005, Section...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report to Congress: Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study Draft Report to Congress: Energy Policy Act of 2005, Section 1813, Indian Land ...

  10. Clean Air Act, Section 309 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clean Air Act, Section 309 Clean Air Act, Section 309 The Administrator shall review and comment in writing on the environmental impact of any matter relating to duties and ...

  11. Hawaii DOH Solid Waste Section Webpage | Open Energy Information

    Open Energy Info (EERE)

    Solid Waste Section Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii DOH Solid Waste Section Webpage Abstract This webpage provides an...

  12. SECTION L -ATTACHMENT B - LISTING OF KEY PERSONNEL

    National Nuclear Security Administration (NNSA)

    B, Page 1 SECTION L ATTACHMENT B LISTING OF KEY PERSONNEL TITLE NAME Note: Addremove extra rows if needed...

  13. Section 508 of the Rehabilitation Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Requirements » Section 508 of the Rehabilitation Act Section 508 of the Rehabilitation Act All Office of Energy Efficiency and Renewable Energy (EERE) websites, applications, and other digital media are expected to comply with Section 508 requirements. New and redesigned sites should be compliant when submitted to the Web Governance Team for approval to send live. Section 508 requires all federal agencies to make their electronic and information technologies accessible to people with

  14. USDA Section 502 Direct Loan Application Packaging Training

    Broader source: Energy.gov [DOE]

    The U.S. Department of Agriculture (USDA) is providing Section 502 direct loan application packaging training.

  15. DOE Supplemental Instructions for OMB Section 1512 Reporting - For Grant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Loan Recipients | Department of Energy DOE Supplemental Instructions for OMB Section 1512 Reporting - For Grant and Loan Recipients DOE Supplemental Instructions for OMB Section 1512 Reporting - For Grant and Loan Recipients Instructions for Quarterly reporting through FederalReporting.gov PDF icon DOE Supplemental Instructions for OMB Section 1512 Reporting - For Grant and Loan Recipients More Documents & Publications DOE Supplemental Instructions for OMB Section 1512 Reporting -

  16. Microsoft Word - Section B -Conformed thru 355.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B Contract No. DE-AC27-01RV14136 Conformed Thru Modification No. 355 B - i SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS WTP Contract Section B Contract No. DE-AC27-01RV14136 Conformed Thru Modification No. 355 B - ii SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS TABLE OF CONTENTS Section Clause Page B.1 TYPE OF CONTRACT - ITEMS BEING ACQUIRED ..................................................................... 1 B.2 ITEMS BEING ACQUIRED

  17. Department of Energy (DOE) and Section 508 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy (DOE) and Section 508 Department of Energy (DOE) and Section 508 flag-973746_960_720.jpg In 1998, the Congress amended the Rehabilitation Act to require that all Federal agencies make electronic and information technology accessible to people with disabilities. Under Section 508 (29 U.S.C. 794d), agenices must: incorporate Section 508 requirements into policy and practice manage administrative complaints respond to reporting requirements For additional information: Acquiring

  18. EPAct Section 242 Comments and DOE Responses | Department of Energy

    Office of Environmental Management (EM)

    EPAct Section 242 Comments and DOE Responses EPAct Section 242 Comments and DOE Responses On July 2, 2014 in the Federal Register, the U.S. Department of Energy (DOE) published and requested comment on draft guidance for implementing Section 242 of the Energy Policy Act of 2005 (EPAct 2005). See 79 FR 37733 (July 2, 2014). In many instances, there were common themes among the commenters. This document consolidates and summarizes the comments and responds to the comments. PDF icon EPAct Section

  19. Section 3161 Rehiring Preference for Eligible Separated Employees |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Section 3161 Rehiring Preference for Eligible Separated Employees Section 3161 Rehiring Preference for Eligible Separated Employees PDF icon Attachment 4 - Section 3161 Rehiring Preference for Eligible Separated Employees More Documents & Publications Involuntary Separation Plan Template General Workforce Restructuring Plan Template Workforce Restructuring Policy

  20. Registration Overview for OMB Section 1512 Reporting for DOE Prime

    Energy Savers [EERE]

    Recipients | Department of Energy Registration Overview for OMB Section 1512 Reporting for DOE Prime Recipients Registration Overview for OMB Section 1512 Reporting for DOE Prime Recipients Instructions for reporting through FederalReporting.gov PDF icon Registration Overview for OMB Section 1512 Reporting for DOE Prime Recipients More Documents & Publications Slide 1 Instructions for Grant and Loan Recipients Slide 1

  1. Section 2.2 (Roles and Responsibilities) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Section 2.2 (Roles and Responsibilities) Section 2.2 (Roles and Responsibilities) Describes responsibilities of program managers, office directors, and the peer review leader, as well as corporate responsibilities, for conducting peer reviews. PDF icon Section 2.2 of EERE Peer Review Guide More Documents & Publications SOP for Peer Reviews EERE Peer Review Guide EERE Peer Review Guide - August 2004

  2. Many-Group Cross-Section Adjustment Techniques for Boiling Water Reactor Adaptive Simulation

    SciTech Connect (OSTI)

    Jessee, Matthew Anderson

    2011-01-01

    Computational capability has been developed to adjust multigroup neutron cross sections, including self-shielding correction factors, to improve the fidelity of boiling water reactor (BWR) core modeling and simulation. The method involves propagating multigroup neutron cross-section uncertainties through various BWR computational models to evaluate uncertainties in key core attributes such as core k{sub eff}, nodal power distributions, thermal margins, and in-core detector readings. Uncertainty-based inverse theory methods are then employed to adjust multigroup cross sections to minimize the disagreement between BWR core modeling predictions and observed (i.e., measured) plant data. For this paper, observed plant data are virtually simulated in the form of perturbed three-dimensional nodal power distributions with the perturbations sized to represent actual discrepancies between predictions and real plant data. The major focus of this work is to efficiently propagate multigroup neutron cross-section uncertainty through BWR lattice physics and core simulator calculations. The data adjustment equations are developed using a subspace approach that exploits the ill-conditioning of the multigroup cross-section covariance matrix to minimize computation and storage burden. Tikhonov regularization is also employed to improve the conditioning of the data adjustment equations. Expressions are also provided for posterior covariance matrices of both the multigroup cross-section and core attributes uncertainties.

  3. Working Gas in Underground Storage Figure

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Gas in Underground Storage Figure Working Gas in Underground Storage Compared with 5-Year Range Graph...

  4. PIA - Radiological Work Permit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiological Work Permit PIA - Radiological Work Permit PIA - Radiological Work Permit PDF icon PIA - Radiological Work Permit More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory PIA - HSPD-12 Physical and Logical Access System

  5. Interagency Working Groups | Department of Energy

    Office of Environmental Management (EM)

    About the Federal Energy Management Program » Interagency Working Groups Interagency Working Groups The Federal Energy Management Program works closely with agencies and partner organizations to coordinate interagency working groups. These groups focus on federal energy management and compliance with federal laws and requirements. Interagency Energy Management Task Force The Interagency Energy Management Task Force coordinates federal government activities that encourage energy conservation and

  6. Quality Work Plan Inspection and Monitoring Requirement

    Broader source: Energy.gov [DOE]

    Inspection and monitoring requirements for Weatherization Assistance Program's comprehensive Quality Work Plan.

  7. ILDG Middleware Working Group Status Report

    SciTech Connect (OSTI)

    B. Joo; W. Watson

    2004-09-01

    We report on the status of the ILDG Middleware Working Group. The Middleware Working Group was formed with the aim of designing standard middleware to allow the interoperation of the data grids of ILDG member collaborations. Details of the working group are given. In this contribution we outline the role of middleware in the ILDG, present our proposed middleware architecture and discuss our current status and future work within the working group.

  8. How Fuel Cells Work | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cells Work How Energy Works 30 likes How Fuel Cells Work Fuel cells produce electrical power without any combustion and operate on fuels like hydrogen, natural gas and propane. This clean energy technology can provide power for virtually any application -- from cars and buses to commercial buildings -- while helping reduce carbon pollution and oil consumption. As part of How Energy Works, we'll cover everything from how fuel cells work and why to their important to current uses and the

  9. Training Work Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Outreach Forums » Focus Group and Work Group Activities » Training Work Group Training Work Group Collaborative Training Work Group: In a teamed effort, the U.S. Department of Energy's (DOE) National Training Center (NTC), the National Institute of Environmental Health Sciences (NIEHS), Volpentest HAMMER Training and Education Center (HAMMER), Energy Facility Contractors Group (EFCOG), and labor unions work to identify and address worker health, safety and security training improvement needs

  10. Assessment of Fission Product Cross-Section Data for Burnup Credit Applications

    SciTech Connect (OSTI)

    Leal, Luiz C; Derrien, Herve; Dunn, Michael E; Mueller, Don

    2007-12-01

    Past efforts by the Department of Energy (DOE), the Electric Power Research Institute (EPRI), the Nuclear Regulatory Commission (NRC), and others have provided sufficient technical information to enable the NRC to issue regulatory guidance for implementation of pressurized-water reactor (PWR) burnup credit; however, consideration of only the reactivity change due to the major actinides is recommended in the guidance. Moreover, DOE, NRC, and EPRI have noted the need for additional scientific and technical data to justify expanding PWR burnup credit to include fission product (FP) nuclides and enable burnup credit implementation for boiling-water reactor (BWR) spent nuclear fuel (SNF). The criticality safety assessment needed for burnup credit applications will utilize computational analyses of packages containing SNF with FP nuclides. Over the years, significant efforts have been devoted to the nuclear data evaluation of major isotopes pertinent to reactor applications (i.e., uranium, plutonium, etc.); however, efforts to evaluate FP cross-section data in the resonance region have been less thorough relative to actinide data. In particular, resonance region cross-section measurements with corresponding R-matrix resonance analyses have not been performed for FP nuclides. Therefore, the objective of this work is to assess the status and performance of existing FP cross-section and cross-section uncertainty data in the resonance region for use in burnup credit analyses. Recommendations for new cross-section measurements and/or evaluations are made based on the data assessment. The assessment focuses on seven primary FP isotopes (103Rh, 133Cs, 143Nd, 149Sm, 151Sm, 152Sm, and 155Gd) that impact reactivity analyses of transportation packages and two FP isotopes (153Eu and 155Eu) that impact prediction of 155Gd concentrations. Much of the assessment work was completed in 2005, and the assessment focused on the latest FP cross-section evaluations available in the international nuclear data community as of March 2005. The accuracy of the cross-section data was investigated by comparing existing cross-section evaluations against available measured cross-section data. When possible, benchmark calculations were also used to assess the performance of the latest FP cross-section data. Since March 2005, the U.S. and European data projects have released newer versions of their respective data files. Although there have been updates to the international data files and to some degree FP data, much of the updates have included nuclear cross-section modeling improvements at energies above the resonance region. The one exception is improved ENDF/B-VII cross-section uncertainty data or covariance data for gadolinium isotopes. In particular, ENDF/B-VII includes improved 155Gd resonance parameter covariance data, but they are based on previously measured resonance data. Although the new covariance data are available for 155Gd, the conclusions of the FP cross-section data assessment of this report still hold in lieu of the newer international cross-section data files. Based on the FP data assessment, there is judged to be a need for new total and capture cross-section measurements and corresponding cross-section evaluations, in a prioritized manner, for the nine FPs to provide the improved information and technical rigor needed for criticality safety analyses.

  11. SRS FTF Section 3116 Basis for Determination | Department of Energy

    Energy Savers [EERE]

    FTF Section 3116 Basis for Determination SRS FTF Section 3116 Basis for Determination Basis for Section 3116 Determination for Closure of F-Tank Farm at the Savannah River Site. In accordance with NDAA Section 3116, certain waste from reprocessing of spent nuclear fuel is not high-level waste if the Secretary of Energy, in consultation with the NRC, determines that the criteria in NDAA Section 3116(a) are met. This FTF 3116 Basis Document shows that those criteria are satisfied, to support a

  12. Microsoft Word - RL14788-Section_J-12 GFSI.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, Revision 1 J.12-1 ATTACHMENT J.12 GOVERNMENT-FURNISHED SERVICES AND INFORMATION (GFS/I) Contract Section Project GFS/I C.2.1 Transition DOE will coordinate with the Contractor to provide access to information and facilities required to support transition of work. C.2.1 Transition DOE will coordinate with PHMC, MSC, TOC/TFC, RCC, PNNL, and Johnson Controls, Inc. (JCI) to provide Contractor access to information required to support transition of work; C.2.1 Transition DOE will require PHMC,

  13. Clinton Engineer Works map | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Clinton Engineer Works map Clinton Engineer Works map

  14. Microsoft Word - SECTION J - Current to Mod 002 with Track Changes removed.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9-1 Section J Attachment J-9 ANNUAL ESSENTIAL STAFFING LEVEL The contractor shall maintain the following essential staffing level physically located at the Hanford site. This does not include additional staff and positions the Contractor may require to complete the statement of work. Position Annual Essential Staffing Level Principal Manager 1 Site Occupational Medical Director (SOMD) 1 Clinic Director 1 Nursing Director 1 Physician 1 Physician Assistant/Nurse Practitioner 5 Psychologist 1

  15. Final work plan for targeted sampling at Webber, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2006-05-01

    This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

  16. Electrochemical removal of material from metallic work

    DOE Patents [OSTI]

    Csakvary, Tibor; Fromson, Robert E.

    1980-05-13

    Deburring, polishing, surface forming and the like are carried out by electrochemical machining with conformable electrode means including an electrically conducting and an insulating web. The surface of the work to be processed is covered by a deformable electrically insulating web or cloth which is perforated and conforms with the work. The web is covered by a deformable perforated electrically conducting screen electrode which also conforms with, and is insulated from, the work by the insulating web. An electrolyte is conducted through the electrode and insulating web and along the work through a perforated elastic member which engages the electrode under pressure pressing the electrode and web against the work. High current under low voltage is conducted betwen the electrode and work through the insulator, removing material from the work. Under the pressure of the elastic member, the electrode and insulator continue to conform with the work and the spacing between the electrode and work is maintained constant.

  17. Measurement of the scattering cross section of slow neutrons on liquid parahydrogen from neutron transmission

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Grammer, K. B.; Alarcon, R.; Barrón-Palos, L.; Blyth, D.; Bowman, J. D.; Calarco, J.; Crawford, C.; Craycraft, K.; Evans, D.; Fomin, N.; et al

    2015-05-08

    Liquid hydrogen is a dense Bose fluid whose equilibrium properties are both calculable from first principles using various theoretical approaches and of interest for the understanding of a wide range of questions in many-body physics. Unfortunately, the pair correlation function g(r) inferred from neutron scattering measurements of the differential cross section dσ/dΩ from different measurements reported in the literature are inconsistent. We have measured the energy dependence of the total cross section and the scattering cross section for slow neutrons with energies between 0.43 and 16.1 meV on liquid hydrogen at 15.6 K (which is dominated by the parahydrogen component)more » using neutron transmission measurements on the hydrogen target of the NPDGamma collaboration at the Spallation Neutron Source at Oak Ridge National Laboratory. The relationship between the neutron transmission measurement we perform and the total cross section is unambiguous, and the energy range accesses length scales where the pair correlation function is rapidly varying. At 1 meV our measurement is a factor of 3 below the data from previous work. We present evidence that these previous measurements of the hydrogen cross section, which assumed that the equilibrium value for the ratio of orthohydrogen and parahydrogen has been reached in the target liquid, were in fact contaminated with an extra nonequilibrium component of orthohydrogen. Liquid parahydrogen is also a widely used neutron moderator medium, and an accurate knowledge of its slow neutron cross section is essential for the design and optimization of intense slow neutron sources. Furthermore, we describe our measurements and compare them with previous work.« less

  18. Measurement of the scattering cross section of slow neutrons on liquid parahydrogen from neutron transmission

    SciTech Connect (OSTI)

    Grammer, K. B.; Alarcon, R.; Barrn-Palos, L.; Blyth, D.; Bowman, J. D.; Calarco, J.; Crawford, C.; Craycraft, K.; Evans, D.; Fomin, N.; Fry, J.; Gericke, M.; Gillis, R. C.; Greene, G. L.; Hamblen, J.; Hayes, C.; Kucuker, S.; Mahurin, R.; Maldonado-Velzquez, M.; Martin, E.; McCrea, M.; Mueller, P. E.; Musgrave, M.; Nann, H.; Penttil, S. I.; Snow, W. M.; Tang, Z.; Wilburn, W. S.

    2015-05-08

    Liquid hydrogen is a dense Bose fluid whose equilibrium properties are both calculable from first principles using various theoretical approaches and of interest for the understanding of a wide range of questions in many-body physics. Unfortunately, the pair correlation function g(r) inferred from neutron scattering measurements of the differential cross section d?/d? from different measurements reported in the literature are inconsistent. We have measured the energy dependence of the total cross section and the scattering cross section for slow neutrons with energies between 0.43 and 16.1 meV on liquid hydrogen at 15.6 K (which is dominated by the parahydrogen component) using neutron transmission measurements on the hydrogen target of the NPDGamma collaboration at the Spallation Neutron Source at Oak Ridge National Laboratory. The relationship between the neutron transmission measurement we perform and the total cross section is unambiguous, and the energy range accesses length scales where the pair correlation function is rapidly varying. At 1 meV our measurement is a factor of 3 below the data from previous work. We present evidence that these previous measurements of the hydrogen cross section, which assumed that the equilibrium value for the ratio of orthohydrogen and parahydrogen has been reached in the target liquid, were in fact contaminated with an extra nonequilibrium component of orthohydrogen. Liquid parahydrogen is also a widely used neutron moderator medium, and an accurate knowledge of its slow neutron cross section is essential for the design and optimization of intense slow neutron sources. Furthermore, we describe our measurements and compare them with previous work.

  19. Apparatus and methods for installing, removing and adjusting an inner turbine shell section relative to an outer turbine shell section

    DOE Patents [OSTI]

    Leach, David (Niskayuna, NY); Bergendahl, Peter Allen (Scotia, NY); Waldo, Stuart Forrest (Salem, NC); Smith, Robert Leroy (Milford, OH); Phelps, Robert Kim (Milford, OH)

    2001-01-01

    A turbine includes upper and lower inner shell sections mounting the nozzles and shrouds and which inner shell is supported by pins secured to a surrounding outer shell. To disassemble the turbine for access to the inner shell sections and rotor, an alignment fixture is secured to the lower outer shell section and has pins engaging the inner shell section. To disassemble the turbine, the inner shell weight is transferred to the lower outer shell section via the alignment fixture and cradle pins. Roller assemblies are inserted through access openings vacated by support pins to permit rotation of the lower inner shell section out of and into the lower outer shell section during disassembly and assembly. The alignment fixture includes adjusting rods for adjusting the inner shell axially, vertically, laterally and about a lateral axis. A roller over-cage is provided to rotate the inner shell and a dummy shell to facilitate assembly and disassembly in the field.

  20. The Effect of Cold Work on Properties of Alloy 617

    SciTech Connect (OSTI)

    Richard Wright

    2014-08-01

    Alloy 617 is approved for non-nuclear construction in the ASME Boiler and Pressure Vessel Code Section I and Section VIII, but is not currently qualified for nuclear use in ASME Code Section III. A draft Code Case was submitted in 1992 to qualify the alloy for nuclear service but efforts were stopped before the approval process was completed.1 Renewed interest in high temperature nuclear reactors has resulted in a new effort to qualify Alloy 617 for use in nuclear pressure vessels. The mechanical and physical properties of Alloy 617 were extensively characterized for the VHTR programs in the 1980’s and incorporated into the 1992 draft Code Case. Recently, the properties of modern heats of the alloy that incorporate an additional processing step, electro-slag re-melting, have been characterized both to confirm that the properties of contemporary material are consistent with those in the historical record and to increase the available database. A number of potential issues that were identified as requiring further consideration prior to the withdrawal of the 1992 Code Case are also being re-examined in the current R&D program. Code Cases are again being developed to allow use of Alloy 617 for nuclear design within the rules of the ASME Boiler and Pressure Vessel Code. In general the Code defines two temperature ranges for nuclear design with austenitic and nickel based alloys. Below 427°C (800°F) time dependent behavior is not considered, while above this temperature creep and creep-fatigue are considered to be the dominant life-limiting deformation modes. There is a corresponding differentiation in the treatment of the potential for effects associated with cold work. Below 427°C the principal issue is the relationship between the level of cold work and the propensity for stress corrosion cracking and above that temperature the primary concern is the impact of cold work on creep-rupture behavior.