Powered by Deep Web Technologies
Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Table B2. Summary Table: Totals and Medians of Floorspace, Number of Workers,  

U.S. Energy Information Administration (EIA) Indexed Site

. Summary Table: Totals and Medians of Floorspace, Number of Workers, Hours of Operation, and Age of Building, 1999" . Summary Table: Totals and Medians of Floorspace, Number of Workers, Hours of Operation, and Age of Building, 1999" ,"All Buildings (thousand)","Total Floorspace (million square feet)","Total Workers in All Buildings (thousand)","Median Square Feet per Building (thousand)","Median Square Feet per Worker","Median Hours per Week","Median Age of Buildings (years)" "All Buildings ................",4657,67338,81852,5,909,50,30.5 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,6774,11125,2.5,667,50,30.5 "5,001 to 10,000 ..............",1110,8238,10968,7,1000,50,34.5 "10,001 to 25,000 .............",708,11153,11378,15,1354,55,28.5

2

WIPP Workers Reach Two Million Man-Hours Without a Lost-Time Accident  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Workers Reach Two Million Man-Hours Workers Reach Two Million Man-Hours Without a Lost-Time Accident CARLSBAD, N.M., February 22, 2001 - Workers at the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) reached a safety milestone Feb. 19 by working two million man-hours without a lost-time accident. According to the National Safety Council, facilities with the same industry code as WIPP lose an average of 20.6 workdays (or 164.8 man-hours) a year to accidents. "Safety is at the core of all WIPP operations," said Dr. Inés Triay, Manager of DOE's Carlsbad Field Office. "We are particularly pleased that WIPP workers reached the two million mark during the time in which they mined a new panel and increased shift work." "To make safety a number one priority means more than creating a safe

3

Workers at Paducah Site Exceed 1.5 Million Hours Without Lost-Time Injury, Illness  

Broader source: Energy.gov [DOE]

PADUCAH, Ky. Workers with Paducah site infrastructure contractor Swift & Staley, Inc. recently exceeded 1.5 million hours without lost time away from work due to injury or illness, representing nine years of safe performance.

4

Workers at EM's West Valley Site Surpass 1 Million Hours without...  

Office of Environmental Management (EM)

Achieving 1 million work hours without a lost-time accident is a true indication of the safety culture that we embrace at the West Valley Demonstration Project," EM WVDP Director...

5

Workers at EMs West Valley Site Surpass 1 Million Hours without Lost-Time Accident  

Broader source: Energy.gov [DOE]

WEST VALLEY, N.Y. EMs cleanup contractor at the West Valley Demonstration Project (WVDP) recently marked 1 million work hours without a lost-time accident or illness.

6

Property:EstimatedTimeMedian | Open Energy Information  

Open Energy Info (EERE)

EstimatedTimeMedian EstimatedTimeMedian Jump to: navigation, search Property Name EstimatedTimeMedian Property Type Quantity Description the median estimate of time required Use this type to enumerate a length of time. The default unit is the year. Acceptable units (and their conversions) are: 8766 hours,hour,h,H,Hour,Hours,HOUR,HOURS 365.25 days,day,d,Day,Days,D,DAY,DAYS 52.17857 weeks,week,w,Week,Weeks,W,WEEK,WEEKS 12 months,month,m,Month,Months,M,MONTH,MONTHS 1 years,year,y,Year,Years,Y,YEAR,YEARS Pages using the property "EstimatedTimeMedian" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe Survey + 2.281542e-4 years2 hours 0.0833 days 0.0119 weeks 0.00274 months + A Acoustic Logs + 0.044 years385.92 hours 16.08 days 2.297 weeks 0.528 months +

7

Insulation Workers  

Science Journals Connector (OSTI)

Insulation workers apply insulation materials on objects and buildings for thermal insulation and/or waterproofing.

R. Riala

2012-01-01T23:59:59.000Z

8

Insulation Workers  

Science Journals Connector (OSTI)

Insulation workers install or spray insulation on pipes, boilers, walls, roofs, floors, etc. to improve thermal insulation or waterproofing. Most thermal insulation is now composed of man-made mineral ... rock wo...

R. Riala

2000-01-01T23:59:59.000Z

9

Median Statistics, H0, and the  

Science Journals Connector (OSTI)

We develop median statistics that provide powerful alternatives to ?2 likelihood methods and require fewer assumptions about the data. Application to astronomical data demonstrates that median statistics lead to results that are quite similar and almost as constraining as ?2 likelihood methods but with somewhat more confidence since they do not assume Gaussianity of the errors or that their magnitudes are known. Applying median statistics to Huchra's compilation of nearly all estimates of the Hubble constant, we find a median value H0 = 67 km s-1 Mpc-1. Median statistics assume only that the measurements are independent and free of systematic errors. This estimate is arguably the best summary of current knowledge because it uses all available data and, unlike other estimates, makes no assumption about the distribution of measurement errors. The 95% range of purely statistical errors is ?2 km s-1 Mpc-1. The high degree of statistical accuracy of this result demonstrates the power of using only these two assumptions and leads us to analyze the range of possible systematic errors in the median, which we estimate to be roughly ?5 km s-1 Mpc-1 (95% limits), dominating over the statistical errors. Using a Bayesian median statistics treatment of high-redshift Type Ia supernovae (SNe Ia) apparent magnitude versus redshift data from Riess et al., we find the posterior probability that the cosmological constant ? > 0 is 70% or 89%, depending on the prior information we include. We find the posterior probability of an open universe is about 47%, and the probability of a spatially flat universe is 51% or 38%. Our results generally support the observers' conclusions but indicate weaker evidence for ? > 0 (less than 2 ?). Median statistics analysis of the Perlmutter et al. high-redshift SNe Ia data shows that the best-fit flat-? model is favored over the best-fit ? = 0 open model by odds of 366?:?1; the corresponding Riess et al. odds are 3?:?1 (assuming in each case prior odds of 1?:?1). A scalar field with a potential energy with a "tail" behaves like a time-variable ?. Median statistics analyses of the SNe Ia data do not rule out such a time-variable ? and may even favor it over a time-independent ? and a ? = 0 open model.

J. Richard Gott III; Michael S. Vogeley; Silviu Podariu; Bharat Ratra

2001-01-01T23:59:59.000Z

10

Amchitka Former Workers, Construction Worker Screening Projects |  

Broader source: Energy.gov (indexed) [DOE]

Amchitka Former Workers, Construction Worker Screening Projects Amchitka Former Workers, Construction Worker Screening Projects Amchitka Former Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Amchitka Worker Population Served: All workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied

11

Common Help Room Hours  

E-Print Network [OSTI]

Common Help Room Hours for Spring 2015. Monday, Tuesday, Wednesday, Thursday, Friday. 10:30 am. 11:30 am. MA 16200 - MATH 205 - Nathanael Cox...

12

Common Help Room Hours  

E-Print Network [OSTI]

Common Help Room Hours for Spring 2015. Monday, Tuesday, Wednesday, Thursday, Friday. 10:30 am. 11:30 am. MA 16010 - MATH 205 - Alessandra...

13

Contacts / Hours - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Contacts Hours Current NWS...

14

LIBRARY SERVICES LIBRARY HOURS  

E-Print Network [OSTI]

LIBRARY SERVICES LIBRARY HOURS Up-to-date library hours are posted at http Wesleyan ID that is linked to the library circulation database is needed to charge out library materials to visit the Circulation Office in Olin Library 115 to set up their borrowing privileges. If you have

Royer, Dana

15

Worker Safety and Health  

Broader source: Energy.gov [DOE]

Worker Safety and Health Policy establishes Departmental expectations for worker safety and health through the development of rules, directives and guidance. Worker safety and health policy will ensure that workers are adequately protected from hazards associated with DOE sites and operations and reflect national worker safety and health laws, regulations, and standards where applicable.

16

hourly | OpenEI  

Open Energy Info (EERE)

hourly hourly Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (7 months ago) Date Updated July 02nd, 2013 (5 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

17

Career Map: Construction Worker  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Construction Worker positions.

18

Career Map: Transportation Worker  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Transportation Worker positions.

19

TEMPORARY FOOD SERVICE WORKER UNIVERSITY HOUSING & DINING SERVICES  

E-Print Network [OSTI]

PART-TIME TEMPORARY FOOD SERVICE WORKER UNIVERSITY HOUSING & DINING SERVICES WAGE $11.08 / HOUR Description The Food Service Worker 2 performs a variety of routine and semiroutine food service activities such as preparing, cooking, and serving simple foods in a volume dining or food service facility. Position Summary

Escher, Christine

20

NERSC Edison Hours Used Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hours Used Edison Hours Used 2014 Edison Usage Chart Edison Usage Chart 2013 Edison Usage Chart Edison Usage Chart 2014 Date Hours Used (in millions) Percent of Maximum Possible...

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

FALL AND SPRING Per Hour # Hours # Semesters Total  

E-Print Network [OSTI]

$4,060.00 FALL AND SPRING Per Hour # Hours # Semesters Total Tuition $765.00 15 2 $22,950.00 ISS, Engineering, Journalism & Mass Communications, Music and Social Welfare fees. These amounts do NOT include to complete at least 12 hours each fall and spring semester. Calculations are based on 15 hours (an average

22

More Workers"  

U.S. Energy Information Administration (EIA) Indexed Site

5. Employment Size Category, Number of Buildings for Non-Mall Buildings, 2003" 5. Employment Size Category, Number of Buildings for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)" ,"All Buildings*","Number of Workers" ,,"Fewer than 5 Workers","5 to 9 Workers","10 to 19 Workers","20 to 49 Workers","50 to 99 Workers","100 to 249 Workers","250 or More Workers" "All Buildings* ...............",4645,2653,778,563,398,147,77,30 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2552,1879,422,202,43,"Q","Q","N" "5,001 to 10,000 ..............",889,452,192,146,87,"Q","Q","N" "10,001 to 25,000 .............",738,268,134,154,131,42,"Q","N"

23

Worker | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Worker Worker Worker The Office of Health, Safety and Security has information resources available for former DOE Federal, contractor, and subcontractor workers who work with and around nuclear materials at Department of Energy nuclear facilities and laboratories. Former Worker Medical Screening Program The Former Worker Medical Screening Program (FWP) provides ongoing medical screening examinations, at no cost, to all former DOE Federal, contractor, and subcontractor workers who may be at risk for occupational diseases. The FWP is supported by the U.S. Department of Energy's (DOE) Office of Health, Safety and Security (HSS) and reflects our commitment to the health and safety of all DOE workers - past and present - who have served the Nation in its National security and other missions.

24

Introduction The median problem for the reversal distance in  

E-Print Network [OSTI]

genomes E. Ohlebusch, M.I. Abouelhoda, K. Hockel, J. Stallkamp University of Ulm, Germany CPM 2005 The median problem for the reversal distance in circular bacterial genomes #12;Introduction Methods Conclusion General Problem Distances Specific Problem Median Problem Given 3 genomes G1, G2, and G3, find

Lonardi, Stefano

25

ORISE: Worker Health Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Worker Health Research Worker Health Research Worker Health Research The Oak Ridge Institute for Science and Education (ORISE) provides technical assistance to the U.S. Department of Energy (DOE) and other government agencies by performing specialized worker health research to assess the health of workers and other populations. Statistical methods, epidemiologic research and hazard assessments are core ORISE worker health research competencies. Because information technology is an integral part of the epidemiologic research process, ORISE also capitalizes on its benefits by organizing worker health research data into manageable databases. By providing DOE and the scientific community with accessible information on the long-term health outcomes of occupational exposures, ORISE is helping improve the

26

NERSC Hopper Hours Used Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hours Used Hopper Hours Used 2014 Hopper Usage Chart Hopper Usage Chart 2013 Hopper Usage Chart Hopper Usage Chart 2012 Hopper Usage Chart Hopper Usage Chart 2011 Hopper Usage...

27

Swimming Pool Worker Dermatoses  

Science Journals Connector (OSTI)

Ultraviolet light and water disinfection byproducts such as trihalomethanes (THMs) and haloacetic acids can potentially increase cancer risk in swimming pool workers. THMs and chloroform are activated to...

Dr. Aieska De Souza; David E. Cohen

2012-01-01T23:59:59.000Z

28

Property:EstimatedCostMedianUSD | Open Energy Information  

Open Energy Info (EERE)

EstimatedCostMedianUSD EstimatedCostMedianUSD Jump to: navigation, search Property Name EstimatedCostMedianUSD Property Type Quantity Description the median estimate of cost in USD Use this type to express a monetary value in US Dollars. The default unit is one US Dollar. http://en.wikipedia.org/wiki/Area Acceptable units (and their conversions) are: 100 cent USD,cents USD,Cent USD,Cents USD .001 k USD,thousand USD,Thousand USD .000001 M USD,million USD,Million USD .000000001 T USD,trillion USD,Trillion USD Pages using the property "EstimatedCostMedianUSD" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe Survey + 30030,000 centUSD 0.3 kUSD 3.0e-4 MUSD 3.0e-7 TUSD + A Acoustic Logs + 4.62462 centUSD 0.00462 kUSD 4.62e-6 MUSD 4.62e-9 TUSD + Aerial Photography + 240.5424,054 centUSD

29

FALL AND SPRING Per Hour # Hours # Semesters Total  

E-Print Network [OSTI]

$4,060.00 FALL AND SPRING Per Hour # Hours # Semesters Total Tuition $828.00 15 2 $24,840.00 ISS Living Expenses Please see reverse side for Architecture, Arts, Business, Design & Planning, Engineering to change. Tuition will be guaranteed through spring 2018; however, expect approximately a 5% increase each

30

Workers' Spotlight Newsletter- Issue 4  

Broader source: Energy.gov [DOE]

Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. February 2013 issue covers John Hopkins University Former Worker Program.

31

NERSC Franklin Hours Used Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Franklin Hours Used Franklin Hours Used Franklin Hours Used 2011 Franklin Usage in Hours 2011 Franklin Usage in Hours 2010 2010 Franklin Usage in Hours 2009 2009 Franklin Usage in Hours 2007-2008 2008 Franklin Usage in Hours 2008 Franklin Usage in Hours Date Hours Used (in thousands) Percentage of Maximum Possible (24 hours/day) 04/28/2012 0.00 0.00 04/27/2012 272.62 29.40 04/26/2012 692.81 74.71 04/25/2012 841.60 90.75 04/24/2012 53.86 5.81 04/23/2012 432.01 46.59 04/22/2012 823.23 88.77 04/21/2012 473.95 51.11 04/20/2012 173.75 18.74 04/19/2012 449.22 48.44 04/18/2012 816.23 88.02 04/17/2012 754.35 81.34 04/16/2012 648.89 69.97 04/15/2012 812.25 87.59 04/14/2012 843.46 90.95 04/13/2012 737.46 79.52 04/12/2012 711.97 76.77 04/11/2012 734.65 79.22 04/10/2012 815.65 87.95 04/09/2012 897.25 96.75

32

Hanford Workers Compensation - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About Us > Hanford Site Wide Programs > Hanford Workers Compensation About Us Hanford Overview and History Hanford Cleanup Hanford Site Wide Programs Hanford Workers Compensation...

33

Placement of Traffic Barriers on Roadside and Median Slopes  

E-Print Network [OSTI]

on the findings obtained from crash tests performed on flat terrain. For barriers placed on roadside and median slopes, vehicle impact height varies depending on the trajectory of the vehicle along the ditch section and lateral offset of the barrier. Thus...

Ferdous, Md Rubiat

2011-08-08T23:59:59.000Z

34

Hanford Former Workers, Construction Worker Screening Projects | Department  

Broader source: Energy.gov (indexed) [DOE]

Hanford Former Workers, Construction Worker Screening Projects Hanford Former Workers, Construction Worker Screening Projects Hanford Former Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Hanford Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Local Outreach Office: Sherry Gosseen 3021 W. Clearwater Ave., Ste. 204 Kennewick, WA 99336 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

35

Rocky Flats Former Construction Workers, Construction Worker Screening  

Broader source: Energy.gov (indexed) [DOE]

Rocky Flats Former Construction Workers, Construction Worker Rocky Flats Former Construction Workers, Construction Worker Screening Projects Rocky Flats Former Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Rocky Flats Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Local Outreach Office: Dwayne Adkins 7510 W. Mississippi Ave., Suite 230 Lakewood, CO 80226 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica

36

Oak Ridge Reservation Former Workers, Construction Worker Screening  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge Reservation Former Workers, Construction Worker Screening Oak Ridge Reservation Former Workers, Construction Worker Screening Projects Oak Ridge Reservation Former Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Oak Ridge K-25 Gaseous Diffusion Plant, Y-12, Oak Ridge National Laboratory (ORNL or X-10) Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (888) 464-0009 Local Outreach Office: Kim Cranford, RN 708 South Illinois Avenue, Suite E103 Oak Ridge, TN 37830 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos,

37

Pinellas Former Construction Worker, Construction Worker Screening Projects  

Broader source: Energy.gov (indexed) [DOE]

Pinellas Former Construction Worker, Construction Worker Screening Pinellas Former Construction Worker, Construction Worker Screening Projects Pinellas Former Construction Worker, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Pinellas Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: 1-800-866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

38

Worker Rights Pamphlet  

Office of Environmental Management (EM)

Protection is the Law You have the right to a safe workplace. The Department of Energy (DOE) Worker Safety and Health Program Rule (10 CFR 851) was developed as a result of...

39

Workers' Spotlight Newsletter- Issue 5  

Broader source: Energy.gov [DOE]

Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. March 2013 issue covers Former Worker Medical Screening Program 2012 Annual Report and University of Iowa - Former Worker Program.

40

Workers' Spotlight Newsletter- Issue 9  

Broader source: Energy.gov [DOE]

Workers Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. September/October 2013 issue covers Former Worker Medical Screening Program Milestone, United States Preventive Services Task Force (USPSTF) and John Hopkins Former Worker Program in New Mexico.

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EIA-930 Hourly and Daily Balancing ...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

not change from day-to-day or hour-to-hour, as specified in the immediately preceding section. For each hour of the day, hourly integrated demand is to be posted within ten...

42

Portsmouth Gaseous Diffusion Plant Former Workers, Construction Worker  

Broader source: Energy.gov (indexed) [DOE]

Plant Former Workers, Construction Plant Former Workers, Construction Worker Screening Projects Portsmouth Gaseous Diffusion Plant Former Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Portsmouth Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (888) 464-0009 Local Outreach Office: Ron Bush 1236 Gallia Street Portsmouth, OH 45662 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

43

Argonne National Laboratory-West Former Workers, Construction Worker  

Broader source: Energy.gov (indexed) [DOE]

West Former Workers, Construction West Former Workers, Construction Worker Screening Projects Argonne National Laboratory-West Former Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Argonne National Laboratory-West Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: 1-800-866-9663 Local Outreach Office: Dan Obray 456 N. Arthur Ave. Pocatello, ID 83204 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica

44

Idaho National Laboratory Former Construction Workers, Construction Worker  

Broader source: Energy.gov (indexed) [DOE]

Idaho National Laboratory Former Construction Workers, Construction Idaho National Laboratory Former Construction Workers, Construction Worker Screening Projects Idaho National Laboratory Former Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Idaho National Laboratory (INL) Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: 1-800-866-9663 Local Outreach Office: Dan Obray 456 N. Arthur Avenue Pocatello, ID 83204 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica

45

Waste Isolation Pilot Plant Construction Workers, Construction Worker  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Construction Workers, Construction Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: WIPP Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

46

NAPA Collaboration Project: Worker Dialogue to Improve Worker Health,  

Broader source: Energy.gov (indexed) [DOE]

NAPA Collaboration Project: Worker Dialogue to Improve Worker NAPA Collaboration Project: Worker Dialogue to Improve Worker Health, Safety and Security NAPA Collaboration Project: Worker Dialogue to Improve Worker Health, Safety and Security Beginning on June 14, 2010, the Office of Health, Safety and Security (HSS) at DOE, in partnership with the nonprofit, non-partisan National Academy of Public Administration, will host A Worker Dialogue: Improving Health, Safety and Security at DOE. This web-based "conversation" will engage the DOE workforce in an open, online dialogue to discuss challenges, generate innovative ideas and recommend ways to improve worker safety. A Worker Dialogue was an important example of how government can use new collaborative tools in a targeted way to inform policy and programs, even

47

Iowa Army Ammunition Plant Former Workers, Construction Worker Screening  

Broader source: Energy.gov (indexed) [DOE]

Iowa Army Ammunition Plant Former Workers, Construction Worker Iowa Army Ammunition Plant Former Workers, Construction Worker Screening Projects Iowa Army Ammunition Plant Former Workers, Construction Worker Screening Projects Project Name: Medical Monitoring of Former Atomic Weapons Workers at the Iowa Army Ammunition Plant (IAAP) in Burlington, Iowa Covered DOE Site: IAAP Worker Population Served: All Line 1/Division B Workers Principal Investigator: Laurence Fuortes, MD Toll-free Telephone: (866) 282-5818 Local Medical Clinics: University of Iowa Hospitals and Clinics 200 Hawkins Drive Iowa City, IA 52242 Henry County Health Center 407 South White Street Mt. Pleasant, IA 62641 Great River Medical Center 1221 S. Gear Avenue West Burlington, IA 52655 Website: http://cph.uiowa.edu/iowafwp/ This project is intended to screen for occupational health conditions among

48

Radiological Worker Training  

Broader source: Energy.gov (indexed) [DOE]

MEASUREMENT MEASUREMENT SENSITIVE DOE-HDBK-1130-2008 Appendix B December 2008 Reaffirmed 2013 DOE HANDBOOK RADIOLOGICAL WORKER TRAINING RADIOLOGICAL CONTAMINATION CONTROL TRAINING FOR LABORATORY RESEARCH U.S. Department of Energy FSC 6910 Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Radiological Worker Training Appendix B Radiological Contamination Control for Laboratory Research DOE-HDBK-1130-2008 This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ . ii Radiological Worker Training Appendix B Radiological Contamination Control for Laboratory Research DOE-HDBK-1130-2008 Foreword This Handbook describes a recommended implementation process for core training as outlined in

49

Radiological Worker Training  

Broader source: Energy.gov (indexed) [DOE]

NOT MEASUREMENT NOT MEASUREMENT SENSITIVE DOE-HDBK-1130-2008 Appendix A Change Notice 2 Reaffirmed 2013 DOE HANDBOOK Radiological Worker Training Radiological Control Training for Supervisors U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Radiological Worker Training - Appendix A Radiological Control Training for Supervisors DOE-HDBK-1130-2008 This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ ii Radiological Worker Training - Appendix A Radiological Control Training for Supervisors DOE-HDBK-1130-2008 Foreword This Handbook describes an implementation process for training as recommended in

50

Radiological Worker Training  

Broader source: Energy.gov (indexed) [DOE]

NOT MEASUREMENT NOT MEASUREMENT SENSITIVE DOE-HDBK-1130-2008 Appendix A Change Notice 2 Reaffirmed 2013 DOE HANDBOOK Radiological Worker Training Radiological Control Training for Supervisors U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Radiological Worker Training - Appendix A Radiological Control Training for Supervisors DOE-HDBK-1130-2008 This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ ii Radiological Worker Training - Appendix A Radiological Control Training for Supervisors DOE-HDBK-1130-2008 Foreword This Handbook describes an implementation process for training as recommended in

51

Radiological Worker Training  

Broader source: Energy.gov (indexed) [DOE]

NOT MEASUREMENT SENSITIVE DOE-HDBK-1130-2008 Appendix C December 2008 Reaffirmed 2013 DOE HANDBOOK Radiological Worker Training Radiological Safety Training for Radiation Producing (X-Ray) Devices U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Radiological Worker Training - Appendix C Radiological Safety Training for Radiation-Producing (X-Ray) Devices DOE-HDBK-1130-2008 Program Management This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ ii Radiological Worker Training - Appendix C Radiological Safety Training for Radiation-Producing (X-Ray) Devices DOE-HDBK-1130-2008

52

Radiological Worker Training  

Broader source: Energy.gov (indexed) [DOE]

NOT MEASUREMENT SENSITIVE DOE-HDBK-1130-2008 Appendix C December 2008 Reaffirmed 2013 DOE HANDBOOK Radiological Worker Training Radiological Safety Training for Radiation Producing (X-Ray) Devices U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Radiological Worker Training - Appendix C Radiological Safety Training for Radiation-Producing (X-Ray) Devices DOE-HDBK-1130-2008 Program Management This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ ii Radiological Worker Training - Appendix C Radiological Safety Training for Radiation-Producing (X-Ray) Devices DOE-HDBK-1130-2008

53

Workers' Spotlight Newsletters | Department of Energy  

Office of Environmental Management (EM)

Worker Medical Screening Program. May 2013 issue covers BTMed takes aim at COPD, Lung Cancer and Pantex Former Worker Medical Surveillance Program. March 26, 2013 Workers'...

54

The Los Angeles Taxi Workers Alliance  

E-Print Network [OSTI]

Taxi Workers Alliance. http://www.southasiannetwork.org/Angeles Taxi Workers Alliance. September 2006. SweatshopsAngeles Taxi Workers Alliance Jacqueline Leavitt, University

Leavitt, Jacqueline; Blasi, Gary

2009-01-01T23:59:59.000Z

55

NERSC Carver Hours Used Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carver Hours Carver Hours Used Carver Hours Used Hopper Usage Chart Hopper Usage Chart Date Hours Used (in millions) Percent of Maximum Possible (24 hours/day) 01/05/2014 170.00 89.35 01/04/2014 174.38 91.65 01/03/2014 174.15 91.53 01/02/2014 179.72 94.45 01/01/2014 173.76 91.32 12/31/2013 172.25 90.53 12/30/2013 169.62 89.14 12/29/2013 164.72 86.57 12/28/2013 177.92 93.51 12/27/2013 171.61 90.19 12/26/2013 172.74 90.79 12/25/2013 172.13 90.46 12/24/2013 173.48 91.18 12/23/2013 174.92 91.93 12/22/2013 175.26 92.11 12/21/2013 173.58 91.23 12/20/2013 174.50 91.71 12/19/2013 170.02 89.36 12/18/2013 178.25 93.68 12/17/2013 176.17 92.59 12/16/2013 162.03 85.16 12/15/2013 157.09 82.56 12/14/2013 173.40 91.13 12/13/2013 185.02 97.24 12/12/2013 150.91 79.31 12/11/2013 31.67 16.64 12/10/2013 92.44 48.58

56

Worker Testimonials | Department of Energy  

Office of Environmental Management (EM)

Worker "I'm glad I got tested because it gave me peace of mind that I had no serious health problems. Construction workers get exposed to so many different materials on job...

57

The effectiveness of floor mats as an intervention for standing fatigue of light fabrication workers  

E-Print Network [OSTI]

in Figure 6. For females, the average median was 99. 7 bpm (8. 32 sd) on the tile and 96. 8 bpm (8. 36 sd) on the mats. For males, the average median was 86. 6 bpm (3. 95 sd) on the tile and 88. 9 bpm (3. 60 sd) on the mats. The data reflect a significant... effect for gender was exhibited in median heart rate (p=. 0001). The average median for females was 99. 7 bpm versus 86. 6 bpm for males over the course of the 12-hour work shift. Since the participants worked relatively homogeneous jobs, this result...

O'Brien, Michael Shannon

2012-06-07T23:59:59.000Z

58

Table B1. Summary Table: Totals and Means of Floorspace, Number of Workers, and  

U.S. Energy Information Administration (EIA) Indexed Site

. Summary Table: Totals and Means of Floorspace, Number of Workers, and Hours of Operation, 1999" . Summary Table: Totals and Means of Floorspace, Number of Workers, and Hours of Operation, 1999" ,"All Buildings (thousand)","Total Floorspace (million square feet)","Total Workers in All Buildings (thousand)","Mean Square Feet per Building (thousand)","Mean Square Feet per Worker","Mean Hours per Week" "All Buildings ................",4657,67338,81852,14.5,823,60 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,6774,11125,2.9,609,57 "5,001 to 10,000 ..............",1110,8238,10968,7.4,751,53 "10,001 to 25,000 .............",708,11153,11378,15.7,980,65 "25,001 to 50,000 .............",257,9311,9243,36.2,1007,78

59

Location and Hours | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Location and Hours Location The ORNL Research Library is located off the central corridor of Bldg. 4500N on the main ORNL campus. Hours The library is open 24 hours, seven days a...

60

hourly data | OpenEI  

Open Energy Info (EERE)

data data Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. Source U.S. National Renewable Energy Laboratory (NREL) Date Released May 03rd, 2005 (9 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DNI GHI hourly data NREL solar Sri Lanka SWERA TILT TMY UNEP Data application/zip icon Download TMY data (zip, 67.5 MiB)

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water...  

Broader source: Energy.gov (indexed) [DOE]

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production...

62

Worker Testimonials | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Worker Worker Testimonials Worker Testimonials Rick Hurrelbrink, Pipefitters Local 392, Fernald Former Worker "I'm glad I got tested because it gave me peace of mind that I had no serious health problems. Construction workers get exposed to so many different materials on job sites that you never know how you will be affected. I also was able to take care of a few minor things I wouldn't have known about." Edna Brackey, Portsmouth Gaseous Diffusion Plant Former Worker "This is a thank you statement to the WHPP (Worker Health Protection Program) program and especially to the early detection CT Scan. The scan revealed a lung nodule that turned out to be malignant and was removed while it was tiny with no further treatment needed. THANK YOU FOR MY LIFE."

63

Definition: Kilowatt-hour | Open Energy Information  

Open Energy Info (EERE)

Kilowatt-hour Kilowatt-hour Jump to: navigation, search Dictionary.png Kilowatt-hour A unit of measure for energy, typically applied to electricity usage; equal to the amount of energy used at a rate of 1,000 watts over the course of one hour. One kWh is equivalent to 3,412 Btu, or 3,600 kJ.[1][2] View on Wikipedia Wikipedia Definition The kilowatt hour, or kilowatt-hour, (symbol kW·h, kW h or kWh) is a unit of energy equal to 1000 watt hours or 3.6 megajoules. For constant power, energy in watt hours is the product of power in watts and time in hours. The kilowatt hour is most commonly known as a billing unit for energy delivered to consumers by electric utilities. Also Known As kWh Related Terms British thermal unit, Electricity, Energy, Kilowatt, energy, electricity generation

64

ORISE: Worker Health Studies - Beryllium Associated Worker Registry...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Oak Ridge Institute for Science Education Beryllium Associated Worker Registry (BAWR) The Oak Ridge Institute for Science and Education (ORISE) maintains the Beryllium Associated...

65

NAPA Collaboration Project: Worker Dialogue to Improve Worker...  

Office of Environmental Management (EM)

will host A Worker Dialogue: Improving Health, Safety and Security at DOE. This web-based "conversation" will engage the DOE workforce in an open, online dialogue to...

66

Radiological worker training  

SciTech Connect (OSTI)

This Handbook describes an implementation process for core training as recommended in Implementation Guide G441.12, Radiation Safety Training, and as outlined in the DOE Radiological Control Standard (RCS). The Handbook is meant to assist those individuals within the Department of Energy, Managing and Operating contractors, and Managing and Integrating contractors identified as having responsibility for implementing core training recommended by the RCS. This training is intended for radiological workers to assist in meeting their job-specific training requirements of 10 CFR 835. While this Handbook addresses many requirements of 10 CFR 835 Subpart J, it must be supplemented with facility-specific information to achieve full compliance.

NONE

1998-10-01T23:59:59.000Z

67

Radiological Worker Training  

Broader source: Energy.gov (indexed) [DOE]

98 98 October 1998 Change Notice No. 1 June 2001 Change Notice No. 2 December 2003 Reaffirmation with Errata May 2004 DOE HANDBOOK Radiological Worker Training U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. TS NOT MEASUREMENT SENSITIVE DOE-HDBK-1130-98 ii This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration,

68

Chinese Workers: Under Threat or a Threat to American Workers?  

E-Print Network [OSTI]

. At the same time, some employers have found ways to avoid following the spirit, if not the letter of the laws. The consequences for American workers are unclear, since their challenges are less about a direct threat from Chinese workers and more about...

Harper Ho, Virginia E.; Zhang, Lu

2010-07-01T23:59:59.000Z

69

Vehicle Technologies Office: Fact #597: November 16, 2009 Median Age of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7: November 16, 7: November 16, 2009 Median Age of Cars and Trucks Rising in 2008 to someone by E-mail Share Vehicle Technologies Office: Fact #597: November 16, 2009 Median Age of Cars and Trucks Rising in 2008 on Facebook Tweet about Vehicle Technologies Office: Fact #597: November 16, 2009 Median Age of Cars and Trucks Rising in 2008 on Twitter Bookmark Vehicle Technologies Office: Fact #597: November 16, 2009 Median Age of Cars and Trucks Rising in 2008 on Google Bookmark Vehicle Technologies Office: Fact #597: November 16, 2009 Median Age of Cars and Trucks Rising in 2008 on Delicious Rank Vehicle Technologies Office: Fact #597: November 16, 2009 Median Age of Cars and Trucks Rising in 2008 on Digg Find More places to share Vehicle Technologies Office: Fact #597: November 16, 2009 Median Age of Cars and Trucks Rising in 2008 on

70

Worker Health & Safety Policy, Guidance & Reports  

Broader source: Energy.gov [DOE]

The Office of Worker Safety and Health Policy establishes Departmental expectations for worker safety and health through the development of rules, directives and guidance. Worker safety and health policy will ensure that workers are adequately protected from hazards associated with DOE sites and operations and reflect national worker safety and health laws, regulations and standards where applicable.

71

Office of Worker Safety and Health Enforcement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Worker Safety and Health Enforcement Office of Worker Safety and Health Enforcement MISSION The Office of Worker Safety and Health Enforcement implements the Department's worker...

72

Argonne National Laboratory-West Former Workers, Construction Worker Screening Projects  

Broader source: Energy.gov [DOE]

Argonne National Laboratory-West Former Construction Workers (now known as Idaho National Laboratory), Construction Worker Screening Projects

73

Workers' Spotlight Newsletter- Issue 8  

Broader source: Energy.gov [DOE]

Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Screening Program. July/August issue covers Site Information Sessions, Joint Outreach Task Group Meeting, and National Supplemental Screening Program Low-Dose CT Program.

74

Workers' Spotlight Newsletter- Issue 11  

Broader source: Energy.gov [DOE]

Worker's Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. January/February 2014 issue covers audiogram, the American Museum of Science and Energy, and trivia.

75

Workers' Spotlight Newsletter- Issue 14  

Broader source: Energy.gov [DOE]

Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. July/August/September issue covers Director's Note, 2014 Sylvia Kieding Award, National Atomic Testing Museum, and Calendar of Events.

76

Workers' Spotlight Newsletter- Issue 13  

Broader source: Energy.gov [DOE]

Worker's Spotlight Newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. May/June 2014 issue covers the Director's Note, the Cold War Patriots' Remembrance Quilt, Staff, the National Museum of Nuclear Science and History, Chest X-ray B-reading, and Calendar of Events.

77

Workers' Spotlight Newsletter- Issue 12  

Broader source: Energy.gov [DOE]

Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. March/April 2014 issue covers Joint Outreach Task Group town hall meeting video, the Bradbury Science Museum, and spirometry.

78

Energy Use per Worker-Hour: Evaluating the Contribution of Labor to Manufacturing Energy Use  

E-Print Network [OSTI]

of life-cycle assessment (LCA) is energy consumption, as iteconomic input-output (EIO) LCA, the methodology presentedincluded in process-based LCA. Because both EIO-LCA and the

Zhang, Teresa; Dornfeld, David

2007-01-01T23:59:59.000Z

79

Figure 4-3 Peak Hour Levels of Service with 700 Workers  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

* Auxiliary Turning Bay Auxiliary Turn Lane Between Intersections Free Right-Turn Movement Traffic Signal * LOS BC LOS XX LOS BC LOS BB Page 4-13 W e s t C o l f a x A...

80

Radiological Worker Training  

Broader source: Energy.gov (indexed) [DOE]

TS TS NOT MEASUREMENT SENSITIVE DOE-HDBK-1130-2008 December 2008 Change Notice 2 Reaffirmed 2013 DOE HANDBOOK Radiological Worker Training U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-HDBK-1130-2008 This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ Change 2 DOE-HDBK-1130-2008 Original Change Throughout Program Management Guide Instructor's Guide Student's Guide "Shall" and "Must" statements Program Management Instructor's Material Student's Material Reworded to non-mandatory language unless associated with a requirement document.

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Radiological Worker Training  

Broader source: Energy.gov (indexed) [DOE]

8 8 December 2008 Change Notice 1 June 2009 DOE HANDBOOK Radiological Worker Training U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. TS NOT MEASUREMENT SENSITIVE DOE-HDBK-1130-2008 ii This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ Change 1 DOE-HDBK-1130-2008 Original Change Part 2 Module 2 page 17 Medical radiation sources (total average dose ~ 54 mrem/yr) 1) X rays (total average dose ~ 40mrem/yr) a) X rays are similar to gamma rays; however, they originate outside the nucleus.

82

Radiological Worker Training  

Broader source: Energy.gov (indexed) [DOE]

TS TS NOT MEASUREMENT SENSITIVE DOE-HDBK-1130-2008 December 2008 Change Notice 2 Reaffirmed 2013 DOE HANDBOOK Radiological Worker Training U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-HDBK-1130-2008 This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ Change 2 DOE-HDBK-1130-2008 Original Change Throughout Program Management Guide Instructor's Guide Student's Guide "Shall" and "Must" statements Program Management Instructor's Material Student's Material Reworded to non-mandatory language unless associated with a requirement document.

83

Oak Ridge: Approaching 4 Million Safe Work Hours | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Ridge: Approaching 4 Million Safe Work Hours Ridge: Approaching 4 Million Safe Work Hours Oak Ridge: Approaching 4 Million Safe Work Hours March 11, 2013 - 12:03pm Addthis Safety inspections are a key element in a nuclear cleanup environment with large pieces of cleanup equipment. Inspections are essential to continuing safety success and reaching new milestones.| Photo courtesy of Oak Ridge Safety inspections are a key element in a nuclear cleanup environment with large pieces of cleanup equipment. Inspections are essential to continuing safety success and reaching new milestones.| Photo courtesy of Oak Ridge David Sheeley Editor/Writer for Environmental Management's Office of External Affairs Workers at URS | CH2M Oak Ridge (UCOR), the prime contractor for EM's Oak Ridge cleanup, are approaching a milestone of 4 million safe work hours

84

Office of Worker Safety and Health Policy  

Broader source: Energy.gov [DOE]

The Office of Worker Safety and Health Policy establishes Departmental expectations for worker safety and health through the development of rules, directives and guidance.

85

Training Energy Efficiency Workers | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Training Energy Efficiency Workers Training Energy Efficiency Workers May 20, 2010 - 3:22pm Addthis The Pennsylvania College of Technology is providing training for the state's...

86

Bridge recognition of median-resolution SAR images using pun histogram entropy  

Science Journals Connector (OSTI)

A novel algorithm for bridge recognition of median synthetic aperture radar (SAR) images using histogram entropy presented by Pun is proposed. Firstly, Lee filter and histogram...

Wu, Wenyu; Yin, Dong; Zhang, Rong; Liu, Yan; Pan, Jia

2009-01-01T23:59:59.000Z

87

Information and Instructions for Your Office Hours  

E-Print Network [OSTI]

Aug 7, 2014 ... INFORMATION on OFFICE HOURS and INSTRUCTIONS for TAOH. Please view rather than print this information. Current dates can be found...

Dominic Naughton

2014-08-07T23:59:59.000Z

88

Beryllium-Associated Worker Registry  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beryllium-Associated Worker Registry Beryllium-Associated Worker Registry The Office of Domestic and International Health Studies supports the operation of a surveillance registry of current workers who are exposed to beryllium in their current job, or may have been exposed to beryllium in the past from work conducted at a DOE site. The goal of the registry is to determine the incidence and prevalence of beryllium sensitization and chronic beryllium disease (CBD). The data will be analyzed to better understand CBD and to identify those at risk. Another goal is to monitor and evaluate the effectiveness of DOE's Chronic Beryllium Disease Prevention Program. Current Worker Medical Surveillance Program Screening Results (Data Cumulative through September 2011) Related Documents and Links

89

Former Worker Program Medical Protocol  

Broader source: Energy.gov [DOE]

The medical protocol is intended to identify work-related health outcomes of relevance to DOE workers for which there are screening tests that are reasonably likely to be effective and beneficial to program participants.

90

Incomes of Migratory Agricultural Workers.  

E-Print Network [OSTI]

.64 Colorado 5.35 Minnesota Wisconsin Washington Ohio California Arizona Idaho Illinois North Dakota Other states1 Includes some work in Mexico. !ndicative of family income than are data on in- jividual workers. Average earnings of the fam- dies..., BY STATES, MIGRATORY FARMWORKERS, SOUTH TEXAS, 1956 State and Average Average type of work days earnings worked per worker per per day North Dakota Sugar beets Potatoes Ohio Sugar beets Potatoes Tomatoes Other crops Oklahoma Cotton Oregon...

Sargent, Frederic O.; Metzler, William H.

1960-01-01T23:59:59.000Z

91

Construction Worker Screening Projects | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Worker » Former Worker Program » Worker » Former Worker Program » Construction Worker Screening Projects Construction Worker Screening Projects Sites listed below are the primary DOE sites served. Construction workers from DOE sites not listed below are covered by the Building Trades National Medical Screening Program (BTMed). Additional information regarding BTMed can be found on their website or by calling 1-800-866-9663. Alaska: Amchitka California: Lawrence Berkeley National Laboratory Lawrence Livermore National Laboratory Sandia National Laboratories (Livermore, CA) Colorado: Rocky Flats Florida: Pinellas Idaho: Argonne National Laboratory-West Idaho National Laboratory Illinois: Argonne National Laboratory Fermi National Accelerator Laboratory Iowa: Ames Laboratory Iowa Army Ammunition Plant

92

NAPA Collaboration Project: Worker Dialogue to Improve Worker Health, Safety and Security - June 14, 2010, DOE Worker Dialogue Event Flyer  

Broader source: Energy.gov (indexed) [DOE]

Worker Dialogue Worker Dialogue Improving Health, Safety and Security at the U.S. Department of Energy Log on and participate starting on Monday June 14, 2010 at www.WorkerDialogue.org (username: worker -- password: dialogue) Worker health and safety programs at the Department of Energy (DOE) are most effective when they reflect your knowledge and experience as one of DOE's front-line workers. You will now have the opportunity to share your experience and provide feedback to help enhance and shape DOE's worker safety initiatives. This Worker Dialogue has the support of labor unions and organi- Beginning on Monday, June 14 th , the Office of Health, Safety and zations representing front-line workers Security (HSS) at DOE, in partnership with the nonprofit, non- at DOE.

93

Smart Companies Wake up Night Shift Workers Make More Mistakes & More Prone to Accidents  

Broader source: Energy.gov [DOE]

A study from Circadian Technologies, http://www.circadian.com/media/Press.html, a consulting firm which specializes in advising the nation's largest companies on how to manage their extended-hours operations, estimates that maintaining the practice may be costing companies a steep $206 billion annually -- $8,600 per worker.

94

Oak Ridge: Approaching 4 Million Safe Work Hours | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge: Approaching 4 Million Safe Work Hours Oak Ridge: Approaching 4 Million Safe Work Hours Oak Ridge: Approaching 4 Million Safe Work Hours February 27, 2013 - 12:00pm Addthis Mike Tidwell performs a leak check and inspection on propane tanks Mike Tidwell performs a leak check and inspection on propane tanks Inspections ensure hoisting and rigging equipment performs correctly so employees can safely complete their tasks Inspections ensure hoisting and rigging equipment performs correctly so employees can safely complete their tasks Mike Tidwell performs a leak check and inspection on propane tanks Inspections ensure hoisting and rigging equipment performs correctly so employees can safely complete their tasks OAK RIDGE, Tenn. - Workers at URS | CH2M Oak Ridge (UCOR), the prime contractor for EM's Oak Ridge cleanup, are approaching a milestone of 4

95

Review article Worker connectivity: a simulation model of variation in worker communication  

E-Print Network [OSTI]

Review article Worker connectivity: a simulation model of variation in worker communication and its Online First 2 July 2007 Abstract. We develop a simulation model of worker connectivity to analyze how

O'Donnell, Sean

96

Former Worker Medical Screening Program Summary of Services Available to Former Workers, February 1, 2013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

February 1, 2013 Former Worker Medical Screening Program Summary of Services Available to Former Workers (Sites listed below are primary sites served, but multiple small sites are also served by the Building Trades National Medical Screening Program for construction workers and by the National Supplemental Screening Program for production workers) State DOE Site Worker Population/Medical Screening Program Provider Local Office Location and Phone Number Alaska Amchitka Island All workers, primarily construction CPWR - The Center for Construction Research & Training (CPWR)/Building Trades National Medical Screening Program (BTMed) 1-800-866-9663 California Lawrence Berkeley National Laboratory All workers Queens College (QC)/Worker Health Protection

97

Former Worker Medical Screening Program Summary of Services Available to Former Workers, February 1, 2013  

Broader source: Energy.gov (indexed) [DOE]

February 1, 2013 Former Worker Medical Screening Program Summary of Services Available to Former Workers (Sites listed below are primary sites served, but multiple small sites are also served by the Building Trades National Medical Screening Program for construction workers and by the National Supplemental Screening Program for production workers) State DOE Site Worker Population/Medical Screening Program Provider Local Office Location and Phone Number Alaska Amchitka Island All workers, primarily construction CPWR - The Center for Construction Research & Training (CPWR)/Building Trades National Medical Screening Program (BTMed) 1-800-866-9663 California Lawrence Berkeley National Laboratory All workers Queens College (QC)/Worker Health Protection

98

Hanford Construction Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

CONSTRUCTION CONSTRUCTION WORKES AT HANFORD: A NEEDS ASSESSMENT Submitted by Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Central Washington Building and Construction Trades Council In cooperation with United Brotherhood of Carpenters University of Cincinnati Occupational Health Foundation George Washington University Zenith Administrators, Inc. Duke University July 1, 1997 Table bt Cóütn 1. Introduction and Background a. Specific Aims b. Rationale for Program 2. Need for Establishing Medical Evaluation and Notification a. Medical Surveillance b. History of Site c. Special Issues for Construction Workers 3. Size of Construction Workers' Population (Since 1943) a. Crude Estimate of Population Size b. Population Before 1950 c. Population After 1950

99

Bradbury Science Museum announces winter opening hours  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bradbury Science Museum winter hours Bradbury Science Museum winter hours Bradbury Science Museum announces winter opening hours Museum will be closed on Christmas Day (December 25) and New Year's Day (January 1, 2011). December 21, 2010 Bradbury Science Museum Bradbury Science Museum Contact Communications Office (505) 667-7000 Often called "a window to the Laboratory," the museum annually attracts thousands of visitors from all over the world. LOS ALAMOS, New Mexico, December 21, 2010-Los Alamos National Laboratory's Bradbury Science Museum will be closed on Christmas Day (December 25) and New Year's Day (January 1, 2011). On all other days, the museum will observe regular opening hours: from 10 a.m. to 5 p.m. Tuesdays to Saturdays, and from 1 to 5 p.m. Sundays and Mondays. Often called "a window to the Laboratory," the museum annually attracts

100

MARKETING DEPARTMENT Office Hours Fall 2014  

E-Print Network [OSTI]

MARKETING DEPARTMENT Office Hours Fall 2014 NAME OFFICE HOURS COURSE # COURSE TITLE DAY TIME ROOM MKTG 470.2 MKTG 496.1 Marketing Research Marketing & Sales Analytics MW MW 1000-1150 1400-1550 SSW 3620-1400 and by appointment MKTG 498.1-3 MKTG 779.1 MKTG 790.1 MKTG 797.1 MKTG 798.1-3 Investigation & Report Ad. Marketing

Gallo, Linda C.

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Action Potentials from an Arthropod Ocellus: The Median Eye of Limulus  

Science Journals Connector (OSTI)

...epidermis exposes the "rudimentary" median eye to external illumination (Waterman, unpublished). 1 Stormer, L., Skrft. Norsk. Videns. Akad. Oslo, I. Mat. Naturv. Ki. 1944,- No. 5, 1-158 (1944). 2 Patten, W., The Evolution of the...

Talbot H. Waterman

1953-01-01T23:59:59.000Z

102

Cost-effectiveness of freeway median high occupancy vehicle (HOV) facility conversion to rail guideway transit  

E-Print Network [OSTI]

Many freeways in the United States contain median high occupancy vehicle (HOV) facilities. These facilities have been envisioned by some as reserved space for future rail guideway transit. This thesis examines the cost-effectiveness of converting a...

Best, Matthew Evans

2012-06-07T23:59:59.000Z

103

Development of guidelines for the aesthetic surface treatment of safety-shaped median barriers  

E-Print Network [OSTI]

Safety-shaped median barriers have long been employed to keep misguided vehicles on the roadway. In recent years there has been a growing national desire for more aesthetically pleasing roadside safety systems. Adding surface texture is one...

Ness, Jacob Raymond

2004-11-15T23:59:59.000Z

104

Fact #597: November 16, 2009 Median Age of Cars and Trucks Rising in 2008  

Broader source: Energy.gov [DOE]

The median age of cars and trucks in the U.S. continued to grow in 2008. Due to the economic climate and high gasoline prices that summer, consumers held onto their vehicles longer and delayed new...

105

{chi}{sup 2} versus median statistics in supernova type Ia data analysis  

SciTech Connect (OSTI)

In this paper we compare the performances of the {chi}{sup 2} and median likelihood analysis in the determination of cosmological constraints using type Ia supernovae data. We perform a statistical analysis using the 307 supernovae of the Union 2 compilation of the Supernova Cosmology Project and find that the {chi}{sup 2} statistical analysis yields tighter cosmological constraints than the median statistic if only supernovae data is taken into account. We also show that when additional measurements from the cosmic microwave background and baryonic acoustic oscillations are considered, the combined cosmological constraints are not strongly dependent on whether one applies the {chi}{sup 2} statistic or the median statistic to the supernovae data. This indicates that, when complementary information from other cosmological probes is taken into account, the performances of the {chi}{sup 2} and median statistics are very similar, demonstrating the robustness of the statistical analysis.

Barreira, A. [Centro de Fisica do Porto, Rua do Campo Alegre 687, 4169-007 Porto (Portugal); Departamento de Fisica da Faculdade de Ciencias da Universidade do Porto, Rua do Campo Alegre 687, 4169-007 Porto (Portugal); Avelino, P. P. [Departamento de Fisica da Faculdade de Ciencias da Universidade do Porto, Rua do Campo Alegre 687, 4169-007 Porto (Portugal); Centro de Astrofisica da Universidade do Porto, Rua das Estrelas, 4150-762 Porto (Portugal)

2011-10-15T23:59:59.000Z

106

The Concentration Of Tritium In Urine And Internal Radiation Dose Estimation Of PTNBR Radiation Workers  

SciTech Connect (OSTI)

The operation of Triga 2000 reactor in Nuclear Technology Center for Materials and Radiometry (PTNBR BATAN) normally produce tritium radionuclide which is the activation product of deuterium atom in reactor primary cooling water. According to previous monitoring, tritium was detected with the concentration of 8.236{+-}0.677 kBq/L and 1.704{+-}0.046 Bq/L in the primary cooling water and in reactor hall air, respectively. The tritium in reactor hall air chronically can be inhaled by the workers. In this research, tritium content in radiation workers' urine was determined to estimate the internal radiation doses received by the workers. About 50-100 mL of urine samples were collected from 48 PTNBR workers that is classified as 24 radiation workers and 24 administration staffs as a control. Urine samples of 25 mL were then prepared by active charcoal and KMnO{sub 4} addition and followed with complete distillation. The 2 mL of distillate was added with 13 mL scintillator, shaked vigorously and remained in cool and dark condition for about 24 hours. The tritium in the samples was then measured using liquid scintillation counter (LSC) for 1 hour. From the measurement results it was obtained that the tritium concentration in the urine of radiation workers were in the range of not detected and 5.191 Bq/mL, whereas in the administration staffs the concentration were between not detected and 4.607 Bq/mL. Internally radiation doses were calculated using the tritium concentration data, and it was found the averages about 0.602 {mu}Sv/year and 0.532 {mu}Sv/year for radiation workers and administration staffs, respectively. The doses received by the workers were lower than that of the permissible doses from tritium, i.e. 40 {mu}Sv/year.

Tjahaja, Poppy Intan; Sukmabuana, Putu; Aisyah, Neneng Nur [PTNBR BATAN, Jl. Tamansari no. 71, Bandung 40132 (Indonesia)

2010-12-23T23:59:59.000Z

107

Evaluation of Heat Stress and Strain in Electric Utility Workers  

E-Print Network [OSTI]

exposures in electric utility line workers during work intwo broad classes: utility line workers/meter technicians3 different samples: utility line workers/meter technicians,

Brown, Eric Nicholas

2013-01-01T23:59:59.000Z

108

Office of Worker Safety and Health Assessments | Department of...  

Office of Environmental Management (EM)

Worker Safety and Health Assessments Office of Worker Safety and Health Assessments MISSION The Office of Worker Safety and Health Assessments conducts assessments to provide...

109

Worker Safety and Health Reporting Criteria | Department of Energy  

Office of Environmental Management (EM)

Worker Safety and Health Reporting Criteria Worker Safety and Health Reporting Criteria January 1, 2012 Worker Safety and Health Noncompliances Associated With Occurrences(DOE...

110

Worker Dialogue to Improve Worker Health, Safety and Security. - Worker Dialogue Web Site User's Guide  

Broader source: Energy.gov (indexed) [DOE]

Participating in the Online Dialogue Contacting the National Academy If you have any questions or comments, please contact Danielle Germain (dgermain@napawash.org, 202-204-3632) or Daniel Honker (dhonker@napawash.org, 202-204-3633). How to Use This Site Participating in the Worker Dialogue is easy and intuitive. The Dialogue discussion website allows you to do the following: * Submit an idea * Comment on another user's idea * Rate an idea * Tag ideas * Search for specific topics or subjects Visiting the Worker Dialogue The Worker Dialogue website is located at www.workerdialogue.org; however, the site will display a placeholder page until the Dialogue launches on June 14 th . After June 14 th , visitors to the site will be prompted to enter a username and password prior to entering

111

Professional Workers in the Ukraine  

Science Journals Connector (OSTI)

... Press Service relating to the increase in the number of Soviet professional workers in the Ukraine. In 1914, the territory now constituting Soviet ... . In 1914, the territory now constituting Soviet Ukraine had 44,083 teachers; at the beginning of the school year 1936-37 the ...

1936-11-28T23:59:59.000Z

112

Does Customer Auditing Help Chinese Workers?  

E-Print Network [OSTI]

Does Customer Auditing Help Chinese Workers? Guojun He* andgovernment training and help, (4) fines and punishments, (5)

He, Goujun; Perloff, Jeffrey M.

2012-01-01T23:59:59.000Z

113

hourly solar radiation | OpenEI  

Open Energy Info (EERE)

solar radiation solar radiation Dataset Summary Description (Abstract): A need for predicting hourly global radiation exists for many locations particularly in Bangladesh for which measured values are not available and daily values have to be estimated from sunshine data. The CPRG model has been used to predict values of hourly Gh for Dhaka (23.770N, 90.380E), Chittagong (22.270N, 91.820E) and Bogra (24.850N, 89.370E) for = ±7.50, ±22.50, ±37.50, ±52.50, ±67.50, ±82.50 and ±97.50 i.e., for ±1/2, ±3/2, ±5/2, ±7/2, ±9/2, ±11/2, ±13/2 hours before and after solar noon and the computed values for Source Renewable Energy Research Centre Date Released October 22nd, 2003 (11 years ago) Date Updated Unknown Keywords Bangladesh documentation hourly solar radiation SWERA

114

Ethics and Public Health 3 credit hours  

E-Print Network [OSTI]

PUB H Ethics and Public Health 3 credit hours Summer, 2009 Instructor: Ann Cook, PhD, MPA, Research U.S. public health policies. The course begins with a rationale for studying the ethical dimensions of public health and then examines ethical decisonmaking in arenas such as policy development, research

Vonessen, Nikolaus

115

Credit Based; Beginning Swimming Credit/Hour  

E-Print Network [OSTI]

the pool. To be able to swim at least 50 yards with one of the learned strokes. Required Materials: Swim. Make-Ups: Only two make-ups allowed by swimming laps during open swim/lap swim at MSU pool. Lap swimCredit Based; Beginning Swimming Credit/Hour s Class Title Lead Instructo r Phone Email Office

Maxwell, Bruce D.

116

Project Management Foundation 21 hours, $895  

E-Print Network [OSTI]

Project Management Foundation 21 hours, $895 The fundamental project management processes. In group exercises, participants gain an understanding of how the project management processes are used during each phase of a project to build a better, more effective project plan. Topics Include

Alabama in Huntsville, University of

117

2009-2010 Advertising Curriculum Hours PREREQUISITES  

E-Print Network [OSTI]

2009-2010 Advertising Curriculum Hours PREREQUISITES First Year English 101, 102 6 or satisfactory placement test score Second Year Advertising 250 3 ___ Public Relations 270 3 ___ 3 History 241 ___ Statistics 201 3 ___ Math 125 or Math 141 Accounting 200 3 ___ Advertising 310 3 ___ Advertising 250 TOTAL 31

Grissino-Mayer, Henri D.

118

2007-2008 Advertising Curriculum Hours PREREQUISITES  

E-Print Network [OSTI]

2007-2008 Advertising Curriculum Hours PREREQUISITES First Year English 101, 102 6-4 ___ Math 119 or 123 or satisfactory placement test score TOTAL 32-33 Second Year Advertising 250 3 ___ Advertising 310 3 ___ Adv 250 and admission to the major TOTAL 31 Third Year Psychology 110 3 ___ Business

Grissino-Mayer, Henri D.

119

2011-12 Advertising Curriculum Hours PREREQUISITES  

E-Print Network [OSTI]

2011-12 Advertising Curriculum Hours PREREQUISITES First Year English 101, 102 6-33 Math 141: Math 130 or placement level Second Year Advertising 250 3 ___ Public Relations 270 3 ___ 3 Economics 201 4 ___ Statistics 201 3 ___ Math 125 or Math 141 Accounting 200 3 ___ Advertising 310 3

Grissino-Mayer, Henri D.

120

2010-11 Advertising Curriculum Hours PREREQUISITES  

E-Print Network [OSTI]

2010-11 Advertising Curriculum Hours PREREQUISITES First Year English 101, 102 6-33 Math 141: Math 130 or placement level Second Year Advertising 250 3 ___ Public Relations 270 3 ___ 3 Economics 201 4 ___ Statistics 201 3 ___ Math 125 or Math 141 Accounting 200 3 ___ Advertising 310 3

Grissino-Mayer, Henri D.

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

2012-13 Advertising Curriculum Hours PREREQUISITES  

E-Print Network [OSTI]

2012-13 Advertising Curriculum Hours PREREQUISITES First Year English 101*, 102* 6 Advertising 250 3 ___ Public Relations 270 3 ___ 3 History 241*, 242* or 261*, 262* 6 ___ ___ 4 English or Math 141 Accounting 200 3 ___ Advertising 310 3 ___ Advertising 250 TOTAL 31 Third Year Psychology 110

Grissino-Mayer, Henri D.

122

NERSC Edison Phase I Hours Used Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Edison Phase I Hours Used Edison Phase I Hours Used Edison Phase I Hours Used Edison Usage Chart Edison Usage Chart Date Hours Used (in millions) Percent of Maximum Possible (24 hours/day) 06/23/2013 0.226 88.6 06/22/2013 0.239 93.9 06/21/2013 0.248 97.1 06/20/2013 0.240 94.0 06/19/2013 0.233 91.3 06/18/2013 0.245 96.0 06/17/2013 0.251 98.4 06/16/2013 0.243 95.3 06/15/2013 0.245 95.9 06/14/2013 0.246 96.5 06/13/2013 0.240 94.1 06/12/2013 0.128 50.4 06/11/2013 0.215 84.5 06/10/2013 0.225 88.4 06/09/2013 0.228 89.6 06/08/2013 0.225 88.3 06/07/2013 0.121 47.5 06/06/2013 0.223 87.4 06/05/2013 0.250 98.0 06/04/2013 0.234 91.6 06/03/2013 0.218 85.5 06/02/2013 0.246 96.4 06/01/2013 0.230 90.0 05/31/2013 0.215 84.5 05/30/2013 0.212 83.1 05/29/2013 0.223 87.3 05/28/2013 0.237 93.0 05/27/2013 0.226 88.5 05/26/2013 0.229 89.9

123

Health Promotion Graduate Student Coordinator 15-20 hours/week $18/hour (pending approval)  

E-Print Network [OSTI]

Health Promotion Graduate Student Coordinator 15-20 hours/week $18/hour (pending approval year. The Graduate Student Coordinator for Health Promotion is responsible for assisting the Fitness & Health Promotion Coordinator in the development, promotion, management and implementation of Campus Rec

Lafferriere, Gerardo

124

Society, Technology and the Environment-3credit hours Spanish for Engineering-6 credit hours  

E-Print Network [OSTI]

Society, Technology and the Environment- 3credit hours Spanish for Engineering- 6 credit hours 21st May to 22nd June 2012 The University of Alabama College of Engineering in collaboration with Pamplona for any student interested in technology and the environment; students will have the opportunity to study

Simaan, Nabil

125

2003 CBECS National Median Source Energy Use and Performance Comparisons by  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2003 CBECS National Median Source Energy Use and Performance 2003 CBECS National Median Source Energy Use and Performance Comparisons by Building Type Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources

126

Y-12 Construction hits one million-hour mark without a lost-time accident |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Construction hits one ... Construction hits one ... Y-12 Construction hits one million-hour mark without a lost-time accident Posted: August 30, 2012 - 5:30pm The B&W Y-12 Direct-Hire Construction team has worked one million hours, covering a 633-day period, without a lost-time injury. Some 285 people including building trade crafts, non-manual staff and escorts worked without a lost-time accident during this period. The Construction team's last lost workday was in September 2010. A celebration was held today to mark the safety milestone. Senior leaders from National Nuclear Security Administration Production Office (NPO) and B&W Y-12 were on hand to congratulate the workers. Jim Haynes, B&W Y-12 senior vice president and deputy general manager for projects, said, "Congratulations are due the men and women of

127

Faculty Office Hours Fall 2014 Aberle, James  

E-Print Network [OSTI]

Faculty Office Hours Fall 2014 Aberle, James GWC 326 01:30 PM 02:45 PMM T W F to Tuesday is through:30 AMR to Coleman, James BYENG 450 08:45 AM 09:45 AMT R to By Appointment Cotter, Jeff GWC 424 03:15 PM:00 AM 09:30 AMF to Or at a time arranged via e-mail to reisslein@asu.edu Rodriguez, Armando GWC 352 10

Zhang, Yanchao

128

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hour-by-Hour Cost Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production Genevieve Saur (PI), Chris Ainscough (Presenter), Kevin Harrison, Todd Ramsden National Renewable Energy Laboratory January 17 th , 2013 This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Acknowledgements * This work was made possible by support from the U.S. Department of Energy's Fuel Cell Technologies Office within the Office of Energy Efficiency and Renewable Energy (EERE). http://www.eere.energy.gov/topics/hydrogen_fuel_cells.html * NREL would like to thank our DOE Technology Development Managers for this project, Sara Dillich, Eric Miller, Erika Sutherland, and David Peterson. * NREL would also like to acknowledge the indirect

129

Workers Compensation Program (OWCP) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Workers Compensation Program (OWCP) Workers Compensation Program (OWCP) Workers Compensation Program (OWCP) QUICK GUIDE FOR FEDERAL EMPLOYEES WHEN INJURED ON THE JOB The Office of the Chief Human Capital Officer is responsible for managing the Headquarters Federal Employees Workers' Compensation Program, a program to assist and compensate Federal workers injured on the job. This office answers questions, maintain forms and files, and serves as the liaison between this agency and the Office of Workers' Compensation Program (OWCP), U.S. Department of Labor (DOL) the agency responsible for administering the program. OWCP provides compensation benefits to civilian employees for disability due to personal injury sustained while in the performance of duty or to employment related disease. Benefits cannot be paid if the injury is

130

Welfare Workers' Responses to Domestic Violence Cases: The Effects of Training and Worker Characteristics  

E-Print Network [OSTI]

This study evaluated a one-day domestic violence training for Temporary Assistance for Needy Families (TANF) workers and analyzed the relationship between worker characteristics and the use of work exemptions. In a ...

Saunders, Daniel G.; Holter, Mark C.; Pahl, Lisa C.; Tolman, Richard M.

2006-01-01T23:59:59.000Z

131

Lessons Learned in Optimizing Workers' and Worker Representatives' Input to Work Planning and Control  

Broader source: Energy.gov [DOE]

Slide Presentation by Tom McQuiston, Dr. P.H., United Steelworkers - Tony Mazzocchi Center for Health, Safety and Environmental Education. Lessons Learned in Optimizing Workers and Worker Representatives Input in Work Planning and Control.

132

ORISE: Statistical Analyses of Worker Health  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Statistical Analyses Statistical analyses at the Oak Ridge Institute for Science and Education (ORISE) support ongoing programs involving medical surveillance of workers and other...

133

20140430_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 April to 30 April 2014.

Thibedeau, Joe

2014-05-05T23:59:59.000Z

134

Green Machine Florida Canyon Hourly Data 20130731  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 7/1/13 to 7/31/13.

Vanderhoff, Alex

2013-08-30T23:59:59.000Z

135

20130416_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 4/16/13.

Vanderhoff, Alex

2013-04-24T23:59:59.000Z

136

Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 6/1/13 to 6/30/13

Vanderhoff, Alex

2013-07-15T23:59:59.000Z

137

Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 6/1/13 to 6/30/13

Vanderhoff, Alex

138

20130416_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 4/16/13.

Vanderhoff, Alex

139

20140430_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 April to 30 April 2014.

Thibedeau, Joe

140

Green Machine Florida Canyon Hourly Data 20130731  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 7/1/13 to 7/31/13.

Vanderhoff, Alex

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Cleanroom After-Hours Policy Original: 11/04  

E-Print Network [OSTI]

Cleanroom After-Hours Policy Original: 11/04 Revised: 2//05 CAMD strives to maintain and improve laboratory and User safety along with User efficiency. After- Hours work inside the cleanroom (CR + all hours of LSU Staff holidays. After-Hours Access Request · Cleanroom-trained Users can apply for CR

142

Guidelines for Use MIT Libraries' 24 Hour Study Space  

E-Print Network [OSTI]

Guidelines for Use MIT Libraries' 24 Hour Study Space Access to and use of the MIT Libraries' 24://libguides.mit.edu/hours)). The following principles guide access to 24-hour spaces for all users of the MIT Libraries: Expectations Library policies Behavior Library users in the 24-hour study spaces are expected to refrain from: � Behaviors

143

NAPA Collaboration Project: Worker Dialogue to Improve Worker Health, Safety and Security - June 14, 2010, DOE Worker Dialogue Event Flyer  

Broader source: Energy.gov (indexed) [DOE]

Improving Health, Safety and Security at the U.S. Department of Energy Worker health and safety programs at the Department of Energy (DOE) are most effective when they reflect the knowledge and experience of the Department's frontline workers. Workers will now have the opportunity to share their experiences and provide their feedback to help enhance and shape DOE's worker safety initiatives. Beginning on Monday, June 14 th , the Office of Health, Safety and Security (HSS) at DOE, in partnership with the nonprofit, nonpartisan National Academy of Public Administration, will host A Worker Dialogue: Improving Health, Safety and Security at DOE. This web-based "conversation" will engage the DOE workforce in an open, online dialogue to discuss

144

Office Of Worker Safety And Health Assistance  

Broader source: Energy.gov [DOE]

The Office of Worker Safety and Health Assistance supports program and line organizations in the identification and resolution of worker safety and health issues and management concerns utilizing a corporate issues management process for crosscutting issues providing technical support for organizational specific issues and concerns.

145

Hanford Production Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

Needs Assessment for Medical Surveillance of Needs Assessment for Medical Surveillance of Former Hanford Workers Phase I - October 1, 1997 Report Submitted by: University of Washington Occupational and Environmental Medicine Program 325 Ninth Avenue, Box 359739 Seattle, WA 98104 October 1, 1997 Authors Scott Barnhart, MD, MPH Principal Investigator Tim Takaro, MD, MPH, MS Co-Principal Investigator Bert Stover, BA Kate Durand, MHS, CIH Bill Trejo, BS Chris Mack, MS Kathy Ertell, MS, CIH Cooperative Agreement # DE-FCO3-96SF21-2581A000 TABLE OF CONTENTS List of Tables iv List of Figures v Executive Summary vi Introduction 1 II. Methods A. Human Subjects 3 B. Population Identification - Available Databases 3 C. Pending Databases 4 D. Assembly of Master Database 5 E. Estimation of Mortality 6 F. Estimation of Exposure* 6 C. Estimate of Need of Medical Surveillance

146

Hanford Production Workers Needs Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Medical Surveillance of Medical Surveillance of Former Hanford Workers Phase I - October 1, 1997 Report Submitted by: University of Washington Occupational and Environmental Medicine Program 325 Ninth Avenue, Box 359739 Seattle, WA 98104 October 1, 1997 Authors Scott Barnhart, MD, MPH Principal Investigator Tim Takaro, MD, MPH, MS Co-Principal Investigator Bert Stover, BA Kate Durand, MHS, CIH Bill Trejo, BS Chris Mack, MS Kathy Ertell, MS, CIH Cooperative Agreement # DE-FCO3-96SF21-2581A000 TABLE OF CONTENTS List of Tables iv List of Figures v Executive Summary vi Introduction 1 II. Methods A. Human Subjects 3 B. Population Identification - Available Databases 3 C. Pending Databases 4 D. Assembly of Master Database 5 E. Estimation of Mortality 6 F. Estimation of Exposure* 6 C. Estimate of Need of Medical Surveillance

147

Former Worker Program - Beryllium Testing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beryllium Testing Beryllium Testing Former Worker Medical Screening Program (FWP) Beryllium is a naturally occurring metal and is not radioactive. Because of its properties, beryllium has been part of the atomic energy and nuclear weapons industries since the 1940s. Exposure to beryllium and certain beryllium compounds can result in beryllium sensitization, which may develop into a disease of the lungs called chronic beryllium disease (CBD). Beryllium sensitization is an "allergic" condition to beryllium that can develop primarily after a person breathes air containing beryllium mists, dusts, and fumes. Even brief or small exposures to beryllium can lead to sensitization and/or CBD. However, most people exposed to beryllium will NOT get the disease. Other beryllium-related disorders can affect the skin, liver, spleen, heart, eye, or kidney. These disorders often occur in the presence of CBD.

148

SRS Construction Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

SAVANNAH RIVER BUILDING TRADES SAVANNAH RIVER BUILDING TRADES MEDICAL SCREENING PROGRAM A NEEDS ASSESSMENT Submitted by The Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Augusta, Georgia Building and Construction Trades Council In Cooperation with Duke University Medical Center Medlantic Research Institute United Brotherhood of Carpenters Health and Safety Fund University of Cincinnati Medical Center Zenith Administrators, Inc. June 23, 1998 Contents Summary and Response to Needs Assessment Questions , page i 1. Introduction and Rationale, 1 a. Aims, 1 b. Focus of Needs Assessment, 1 c. Organization, 1 d. Rationale for Program, 2 2. Need for Medical Evaluation and Notification, 3 a. Medical Surveillance, 3

149

hourly emission factors | OpenEI  

Open Energy Info (EERE)

60 60 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142278660 Varnish cache server hourly emission factors Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. Source NREL Date Released April 11th, 2011 (3 years ago) Date Updated April 11th, 2011 (3 years ago)

150

Estimation of hourly global and diffuse solar radiation from hourly sunshine duration  

SciTech Connect (OSTI)

A statistical procedure has been employed to develop correlations of monthly-mean-hourly global and diffuse solar radiation on a horizontal surface to hourly sunshine duration. Several years of measured data on solar radiation and sunshine duration, reported in the literature for two stations in the southern African region, is employed for this purpose. The applicability of the developed correlations is tested by estimating solar radiation for a new location. The excellent agreement between the measured and estimated data for that station the wide applicability of the method.

Gopinathan, K.K (National Univ. of Lesotho, Roma (South Africa))

1992-01-01T23:59:59.000Z

151

Hanford workers begin cleaning out historic McCluskey Room  

Broader source: Energy.gov [DOE]

Workers have entered one of the most hazardous rooms at the Hanford Site in Washington state to begin final cleanup of a room that became known to workers over the years by the name of a worker...

152

Job Safety and Health Poster Worker Rights | Department of Energy  

Energy Savers [EERE]

Job Safety and Health Poster Worker Rights Job Safety and Health Poster Worker Rights Department of Energy (DOE) Job Safety and Health poster. DOE Order 440.1B Worker Protection...

153

Energy Jobs: Utility Line Worker | Department of Energy  

Energy Savers [EERE]

Utility Line Worker Energy Jobs: Utility Line Worker October 21, 2014 - 1:10pm Addthis Line workers get hands-on experience with an electrical pole as part of their training. |...

154

Q1, gender 1 = male, 2 = female. (1 occurence of "Not answered" (0) changed to median value 1).  

E-Print Network [OSTI]

, average time per week used on AoC 1 = less than 1 hour, 2 = 1-3 hours, 3 = 3-5 hours, 4 = 5-7 hours, 5 = more than 7 hours Q4, "Compared with an average student in the course I used ... on AoC" 1 = much less would definitely benefit from using a system like AoC" followed Likert scale where 1 = strongly disagree

Natvig, Lasse

155

Workers' Spotlight Newsletter - Issue 6 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Worker Medical Screening Program. May 2013 issue covers: BTMed takes aim at COPD, Lung Cancer Director's Note Staff Trivia Pantex Former Worker Medical Surveillance Program. Trivia...

156

Workers' Spotlight Newsletter - Issue 15 | Department of Energy  

Office of Environmental Management (EM)

5 Workers' Spotlight Newsletter - Issue 15 OctoberNovemberDecember 2014, Issue 15 Workers' Spotlight newsletter is a monthly publication that provides information regarding the...

157

Hanford Site Worker Eligibility Tool | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Site Worker Eligibility Tool Hanford Site Worker Eligibility Tool May 16, 2013 Presenter: Ted Giltz, Volpentest HAMMER Federal Training Center Topics Covered: The Hanford Site...

158

Workers' Spotlight Newsletter - Issue 2 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2 Workers' Spotlight Newsletter - Issue 2 December 2012, Issue 2 Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees...

159

Idaho Waste Treatment Facility Improves Worker Safety and Efficiency...  

Office of Environmental Management (EM)

Idaho Waste Treatment Facility Improves Worker Safety and Efficiency, Saves Taxpayer Dollars Idaho Waste Treatment Facility Improves Worker Safety and Efficiency, Saves Taxpayer...

160

Department of Energy Cites Bechtel National, Inc. for Worker...  

Office of Environmental Management (EM)

Department of Energy Cites Bechtel National, Inc. for Worker Safety and Health Violations Department of Energy Cites Bechtel National, Inc. for Worker Safety and Health Violations...

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Worker Safety and Health Rules, Directives, and Technical Standards...  

Broader source: Energy.gov (indexed) [DOE]

Worker Safety and Health Rules, Directives, and Technical Standards Worker Safety and Health Rules, Directives, and Technical Standards Document Number Title Date 10 CFR 707...

162

10 CFR 851 Worker Safety and Health Program Frequently Asked...  

Office of Environmental Management (EM)

851 Worker Safety and Health Program Frequently Asked Questions - Updated October 19, 2010 10 CFR 851 Worker Safety and Health Program Frequently Asked Questions - Updated October...

163

Smart Companies "Wake up" Night Shift Workers Make More Mistakes...  

Office of Environmental Management (EM)

Smart Companies "Wake up" Night Shift Workers Make More Mistakes & More Prone to Accidents Smart Companies "Wake up" Night Shift Workers Make More Mistakes & More Prone to...

164

Interested Parties - United Auto Workers | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

United Auto Workers Interested Parties - United Auto Workers UAW.pdf More Documents & Publications Interested Parties - BlueGreen Alliance Interested Parties - Myriant...

165

BNL | Center for Functional Nanomaterials Hours of Operation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CFN Hours of Operation CFN Hours of Operation Normal working hours at the CFN are 8 a.m. to 6 p.m. Working Outside of Normal Hours CFN scientific and technical personnel, as well as external users, may need to work outside of normal operating hours, during which time support is limited and many colleagues may not be around. Therefore, working outside the 8 a.m. to 6 p.m. envelope on weekdays, or anytime on weekends and holidays, requires special precautions, especially if working in a laboratory. CFN users are expected to work at the CFN during normal working hours. Users with extensive experience working at the CFN may be granted permission by the appropriate facility leader and ES&H Coordinator to work after hours. Users first must complete the Request to Work After-Hours at

166

2012 Former Worker Medical Screening Program Annual Report | Department of  

Broader source: Energy.gov (indexed) [DOE]

Information Center » Worker » Former Worker Program » 2012 Information Center » Worker » Former Worker Program » 2012 Former Worker Medical Screening Program Annual Report 2012 Former Worker Medical Screening Program Annual Report February 2013 The 2012 Annual Report presents a detailed overview of the accomplishments, progress, and future endeavors of the U.S. Department of Energy Former Worker Medical Screening Program. The report describes how the program is implemented, what organizations are involved in the medical screening efforts, and what the medical findings have been to date. 2012 Former Worker Medical Screening Program Annual Report More Documents & Publications Former Worker Program Medical Protocol Former Worker Medical Screening Program Brochure Former Worker Program Brochure DOE Technical Standards Program

167

Production Worker Screening Projects | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Production Production Worker Screening Projects Production Worker Screening Projects Sites listed below are the primary DOE sites served. Production workers from DOE sites not listed below are covered by the National Supplemental Screening Program (NSSP). Additional information regarding NSSP can be found on their website or by calling 1-866-812-6703. California: Lawrence Berkeley National Laboratory Lawrence Livermore National Laboratory Sandia National Laboratories (Livermore, CA) Colorado: Rocky Flats Florida: Pinellas Idaho: Argonne National Laboratory-West Idaho National Laboratory Illinois: Argonne National Laboratory Fermi National Accelerator Laboratory Iowa: Ames Laboratory Iowa Army Ammunition Plant Kentucky: Paducah Gaseous Diffusion Plant Missouri: Kansas City Plant Nevada:

168

Oak Ridge Construction Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

CONSTRUCT ON WORKERS CONSTRUCT ON WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 Dr. Eula Bingharn, P.1. University of Cincinnati *Ts revised needs assessment reflects an a4fressçs comments from the NIOSH review of our original needs assessment, July, 1997. SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 * * Dr. Eula Bingham, P.1. University of Cincinnati * * *Thjs rerised needs assessment reflects and addtesses comments from the NIOSH review of our original needs assessment, July, 1997! * SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT Principal Investigator Eula Bingham Introduction - Need for Establishing Medical Evaluation and Page Notification 1 a. Medical Surveillance

169

Former Worker Medical Screening Program Brochure  

Broader source: Energy.gov [DOE]

The FWP brochure provides important information to inform former and current DOE Federal, contractor, and subcontractor employees about the benefits and services offered under the DOE Former Worker Medical Screening Program.

170

Child care workers as agents of change  

Science Journals Connector (OSTI)

The need to professionalize child care has been amply demonstrated, but the child care workers' role in the treatment process remains unclear. A model for therapist and child care functioning in the treatment ...

Buell E. Goocher

1971-01-01T23:59:59.000Z

171

Doctoral Defense "CONSTRUCTION WORKERS' ABSENCE BEHAVIOR  

E-Print Network [OSTI]

of the dynamic processes of the emergence and exertion of social controls for worker absence behavior in construction projects. To achieve these goals, five interrelated, interdisciplinary studies using survey

Kamat, Vineet R.

172

Portsmouth and Paducah Construction Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

Needs Assessment for Needs Assessment for Medical Screening of Construction Workers at the Portsmouth and Paducah Gaseous Diffusion Plants Introduction In 1993 the U.S. Congress enacted Section 3162 of the Defense Authorization Act, which directed the Department of Energy (DOE) to initiate programs to evaluate the health of former DOE defense nuclear facility workers. Consistent with the mandate to DOE from Congress, this project implements a notification, health evaluation (including medical screening) and intervention program for former building and construction trades workers at the DOE Oak Ridge, TN site and the Gaseous Diffusion Plants (GDP) at Portsmouth, OH and Paducah, KY, who may have been exposed to health hazards as a result of work at these sites. Based on congressional language, current workers at GDP's may request

173

Worker and Public Health Activities Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Health and Safety Programs Health and Safety Programs Home About HS-13 What's New HS-13 Staff Pandemic Influenza Beryllium-Associated Worker Registry CEDR Illness and Injury Surveillance Program Epi Moratorium United States Transuranium and Uranium Registries Occupational Medicine Worker and Community Public Health Activities Radiation Emergency Assistance Center/Training Site (REAC/TS) Program Chronic Beryllium Disease Bio-repository Initiative Articles Links HSS Logo Worker and Public Health Activities Program The aim of the Worker and Public Health Activities Program is to improve our understanding of the consequences of exposures to ionizing radiation and other hazardous materials to workers and to the public. One of the program's strategic objectives is to support studies related to current and past operations of DOE facilities that ascribe to the highest scientific standards and policies and to communicate the health effects into impact-driven practices for improving worker and public health. This objective strives to ensure that the studies and public health activities address the most relevant research pertaining to DOE operations and provide a framework for intervention. Periodic evaluation of the research via independent external peer review enhances this objective. DOE encourages publication in scientific peer-reviewed journals and presentations at scientific meetings.

174

Portsmouth Gaseous Diffusion Plant, Former Production Workers Screening  

Broader source: Energy.gov (indexed) [DOE]

Portsmouth Gaseous Diffusion Plant, Former Production Workers Portsmouth Gaseous Diffusion Plant, Former Production Workers Screening Projects Portsmouth Gaseous Diffusion Plant, Former Production Workers Screening Projects Project Name: Worker Health Protection Program Covered DOE Site: Portsmouth Worker Population Served: Production Workers Principal Investigator: Jim Frederick Co-Principal Investigator: Steven Markowitz, MD Toll-free Telephone: (888) 241-1199 Local Outreach Office: Jeanne Cisco 2288 Wakefield Mound Road Piketon, OH 45661 Website: http://www.worker-health.org/ This project is conducted by the Unitedsteel Workers in conjunction with Queens College of the City University of New York. The program is being offered as a service to both former and current workers. Free of charge, eligible workers can receive a medical exam, including chest X-ray and

175

Global energy gradients and size in colonial organisms: Worker mass and worker number  

E-Print Network [OSTI]

Global energy gradients and size in colonial organisms: Worker mass and worker number in ant size varies globally is a key challenge to ecology. Solar energy may shape gradients of body size by its effects on local temperature and net primary productivity (16­20). Rising global temperatures (21

Kaspari, Mike

176

Hospital Triage in First Hours After Nuclear or Radiological...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hospital Triage in the First 24 Hours after a Nuclear or Radiological Disaster Medical professionals with the Radiation Emergency Assistance CenterTraining Site (REACTS) at the...

177

Delayed Start or Cancellation of Business Hours | Argonne National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

if you have questions. When regular business hours are suspended The laboratory may not conduct regular operations because of inclement weather. In this case, employees are not...

178

Paducah Gaseous Diffusion Plant, Production Workers Screening Projects |  

Broader source: Energy.gov (indexed) [DOE]

Production Workers Screening Production Workers Screening Projects Paducah Gaseous Diffusion Plant, Production Workers Screening Projects Project Name: Worker Health Protection Program Covered DOE Site: Paducah Worker Population Served: Production Workers Principal Investigator: Jim Frederick Co-Principal Investigator: Steven Markowitz, MD Toll-free Telephone: (888) 241-1199 Local Outreach Office: James Harbison 2525 Cairo Road Paducah, KY 42001 Website: http://www.worker-health.org/ This project is conducted by the United Steelworkers in conjunction with Queens College of the City University of New York. The program is being offered as a service to both former and current workers. Free of charge, eligible workers can receive a medical exam, including chest X-ray and breathing test, and an educational workshop. This program also offers CT

179

Fernald, Former Production Workers Screening Projects | Department of  

Broader source: Energy.gov (indexed) [DOE]

Production Workers Screening Projects Production Workers Screening Projects Fernald, Former Production Workers Screening Projects Project Name: Worker Health Protection Program Covered DOE Site: Fernald Worker Population Served: Production Workers Principal Investigator: Steven Markowitz, MD Toll-free Telephone: (888) 241-1199 Local Outreach Office Ray Beatty and Mooch Callaway 1150 Harrison Ave., Suite 106 Harrison, OH 45030 Website: http://www.worker-health.org/ This project is being conducted by Queens College of the City University of New York. Free of charge, eligible workers can receive a medical exam, including chest X-ray and breathing test. This program also offers CT scans for early lung cancer detection to workers who have an elevated risk of lung cancer as a result of a combination of occupational exposures, age,

180

Former Worker Medical Screening Program Brochure | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Medical Screening Program Brochure Medical Screening Program Brochure Former Worker Medical Screening Program Brochure June 2012 The FWP brochure provides important information to inform former and current DOE Federal, contractor, and subcontractor employees about the benefits and services offered under the DOE Former Worker Medical Screening Program. Some of the topics described in the brochure include: a description of the program, how it is implemented, who is eligible to participate, what tests are offered, where exams are conducted, and what organizations provide the exams. Former Worker Medical Screening Program Brochure More Documents & Publications Former Worker Program Brochure Former Worker Program Summary of Services 2012 Former Worker Medical Screening Program Annual Report

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Office of Worker Safety and Health Policy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Office of Health and Safety Office of Health and Safety Office of Worker Safety and Health Policy Home Mission and Functions Office Contacts Radiological Safety Radiation Protection Policy Current Topics in Radiological Control DOELAP Occupational Exposures (REMS) Training Radiological Control Coordinating Committee Non-Radiological Safety Worker Safety and Health Program Chronic Beryllium Disease Prevention Program Construction Safety Hoisting and Rigging Contractor Substance Abuse Program Chemical Safety Program Emerging Technology: Nanotechnology BioSafety ErgoEaser Functions, Responsibilities and Authorities (FRA) Integrated Safety Management Industrial Hygiene Coordinating Committee Respiratory Protection Safety Bulletins Operating Experiences Office of Safety & Health Response Line Hot Topic

182

USE OF MOVING AVERAGES AND INTERPOLATION TO ESTIMATE MEDIAN-EFFECTIVE DOSE: I. Fundamental Formulas, Estimation of Error, and Relation to Other Methods  

Science Journals Connector (OSTI)

...median-effective dose; fundamental formulas, estimation of error, and...median-effective dose, in cases of a...150-154. 144 ESTIMATION OF MEDL4N-EFFECTIVE DOSE 31. EJUSSEY...The effects of radiations on biological systems...

William R. Thompson

1947-06-01T23:59:59.000Z

183

Credit Based; Beginning Swimming Credit/Hours Class  

E-Print Network [OSTI]

Center Pool Course Description: Beginning swimming skills and water safety. Prerequisites: Must about experience at the meet. 3) Swim laps during open swim/lap swim at MSU pool. A sheet will be postedCredit Based; Beginning Swimming Credit/Hours Class Title Lead Instructor Phone Email Office Hours

Maxwell, Bruce D.

184

Laser Worker Registration Form (LWRF) Surname: Forenames  

E-Print Network [OSTI]

ABCDEFGHI Laser Worker Registration Form (LWRF) Surname: Forenames: School of: Ext No.: Email YY Class of Laser to be Used 1 1M 1E 2 2M 3R 3B 4 Work Location(s) Lab No. Laser Work Currently Undertaken Elsewhere Are you currently engaged in work elsewhere involving laser radiation? YES

Martin, Ralph R.

185

Worker Health Summary, 1995-2004  

Broader source: Energy.gov [DOE]

The Worker Health Summary, 1995-2004 was the first illness and injury surveillance report to include all sites collectively. This report provides an overview of the health of the work force during the period January 1, 1995 through December 31, 2004.

186

General Education and Major Coursework: Credit Hours General Education and Major Coursework: Credit Hours ENGN 110 2 ECE 111 2  

E-Print Network [OSTI]

: 128 ** Meets philosophy and ethics general education requirement. Electrical engineering majors mustGeneral Education and Major Coursework: Credit Hours General Education and Major Coursework: Credit (C or better required) 3 PHYS 231N 4 COMM 101R 3 General Education and Major Coursework: Credit Hours

187

Idaho National Laboratory, Former Production Workers Screening Projects |  

Broader source: Energy.gov (indexed) [DOE]

Idaho National Laboratory, Former Production Workers Screening Idaho National Laboratory, Former Production Workers Screening Projects Idaho National Laboratory, Former Production Workers Screening Projects Project Name: Worker Health Protection Program Covered DOE Site: INL Worker Population Served: Production Workers Principal Investigator: Jim Frederick Co-Principal Investigator: Steven Markowitz, MD Toll-free Telephone: (888) 241-1199 Local Outreach Office: David Fry 1055 Austin Avenue Idaho Falls, ID 83404 Community Care 2725 Channing Way Idaho Falls, ID 83404 Website: http://www.worker-health.org/ This project is conducted by the United Steelworkers, in conjunction with Queens College of the City University of New York. Free of charge, eligible workers can receive a medical exam, including chest X-ray and breathing

188

Savannah River Site, Former Production Workers Screening Projects |  

Broader source: Energy.gov (indexed) [DOE]

Site, Former Production Workers Screening Projects Site, Former Production Workers Screening Projects Savannah River Site, Former Production Workers Screening Projects Project Name: National Supplemental Screening Program Covered DOE Site: SRS Worker Population Served: Production Workers Principal Investigator: Donna Cragle, PhD Toll-free Telephone: (866) 812-6703 Website: http://www.orau.org/nssp/ This project is conducted by the Oak Ridge Associated Universities (ORAU), as a component of its National Supplemental Screening Program. ORAU has teamed with its partners, Comprehensive Health Services, National Jewish Health, the University of Colorado Denver, and Axion Health, to run the program. Construction Worker Screening Projects Construction Worker Projects, Former Worker Medical Screening Program (FWP)

189

Pantex, Former Production Workers Screening Projects | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Pantex, Former Production Workers Screening Projects Pantex, Former Production Workers Screening Projects Pantex, Former Production Workers Screening Projects Project Name: Former Pantex Worker Medical Surveillance Program Covered DOE Site: Pantex Worker Population Served: All Workers Principal Investigator: Arthur Frank, MD, MPH Toll-free Telephone: (888) 378-8939 Local Medical Clinics: WTAMU Health Partners Clinic 4400 S. Washington Street Amarillo, TX 79110 Texas Diagnostic Imaging Center (X-rays only) 1000 Coulter Drive Amarillo, TX 79106 Former workers at risk from exposures while working at Pantex are offered a free medical screening. This project is carried out by Drexel University School of Public Health in conjunction with the University of Texas Health Science Center at Tyler. Workers from this site who do not live in close proximity to the above

190

Argonne National Laboratory-West, Former Production Workers Screening  

Broader source: Energy.gov (indexed) [DOE]

West, Former Production Workers West, Former Production Workers Screening Projects (now known as the Idaho National Laboratory) Argonne National Laboratory-West, Former Production Workers Screening Projects (now known as the Idaho National Laboratory) Project Name: Worker Health Protection Program Covered DOE Site: Argonne National Laboratory-West Worker Population Served: Production Workers Principal Investigator: Jim Frederick Co-Principal Investigator: Steven Markowitz, MD Toll-free Telephone: (888) 241-1199 Local Outreach Office: David Fry 1055 Austin Avenue Idaho Falls, ID 83404 Website: http://www.worker-health.org/ This project is conducted by the United Steelworkers, in partnership with Queens College of the City University of New York. Free of charge, eligible workers can receive a medical exam, including chest X-ray and breathing

191

Mound, Former Production Workers Screening Projects | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Production Workers Screening Projects Production Workers Screening Projects Mound, Former Production Workers Screening Projects Project Name: Worker Health Protection Program Covered DOE Site: Mound Worker Population Served: Production Workers Principal Investigator: Jim Frederick Co-Principal Investigator: Steven Markowitz, MD Toll-free Telephone: 1-877-866-6802 Local Outreach Office Eric Parker, Paige Gibson and Mike Ball 113 East Central Avenue W. Carrollton, OH 45449 Website: http://www.worker-health.org/ This project is being conducted by the United Steelworkers, in conjunction with Queens College of the City University of New York. Free of charge, eligible workers can receive a medical exam, including chest X-ray and breathing test, and an educational workshop. This program also offers CT

192

Worker Protection Management for DOE Federal and Contractor Employees  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses, and accidental losses by providing DOE Federal and contractor workers with a safe and healthful workplace. Cancels DOE O 440.1.

1998-03-27T23:59:59.000Z

193

10 CFR part 851, Workers Safety and Health Program | Department...  

Broader source: Energy.gov (indexed) [DOE]

CFR part 851, Workers Safety and Health Program 10 CFR part 851, Workers Safety and Health Program February 9, 2006 The Department published a final rule to implement the statutory...

194

NAPA Collaboration Project: Worker Dialogue to Improve Worker Health, Safety and Security  

Broader source: Energy.gov [DOE]

Beginning on June 14, 2010, the Office of Health, Safety and Security (HSS) at DOE, in partnership with the nonprofit, non-partisan National Academy of Public Administration, will host A Worker Dialogue: Improving Health, Safety and Security at DOE. This web-based conversation will engage the DOE workforce in an open, online dialogue to discuss challenges, generate innovative ideas and recommend ways to improve worker safety.

195

Breast cancer knowledge, attitudes, and behaviors: a comparison of rural health and non-health workers.  

Science Journals Connector (OSTI)

...found that, compared to non-health workers, health workers saw mammography as less dangerous, believed breast cancer to be...compared to non-health workers, health workers saw mammography as less dangerous, believed breast cancer to be...

R Bastani; A E Maxwell; J Carbonari; R Rozelle; J Baxter; and S Vernon

1994-01-01T23:59:59.000Z

196

NAPA Collaboration Project: Worker Dialogue to Improve Worker Health, Safety and Security - Worker Dialogue Frequently Asked Questions and Registration Data  

Broader source: Energy.gov (indexed) [DOE]

k k Health, Safety and Security . Department of Energy s fety, and Security (HSS) is part duct a g An ome of the Worker Dialogue s DOE partnering with them for this Dialogue? ublic Administration ional leaders ges. As the home of The Collaboration Project, the National Academy in online Dialogues, which are similar to onli this discussion. National Academy ns who work at demy will be viewed as an tcome or result of this dialogue? o harness the "wisdom of the crowd" and provide the HSS leadership s and feedback to inform recommendations for policy changes within y will issue a report from our Panel of Fellows that contains lessons ns on rograms cts that such a report will be highly informative and consequential commendati m other forums, like the HSS Focus Group, where worker es have already been reported? orums have been benefic lishing working relationships between HSS and union leadership,

197

Team Surpasses 1 Million Hours Safety Milestone | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone October 30, 2013 - 12:00pm Addthis The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. NISKAYUNA, N.Y. - Vigilance and dedication to safety led the EM program's disposition project team at the Separations Process Research Unit (SPRU) to achieve a milestone of one million hours - over two-and-a-half-years - without injury or illness resulting in time away from work.

198

Team Surpasses 1 Million Hours Safety Milestone | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone October 30, 2013 - 12:00pm Addthis The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. NISKAYUNA, N.Y. - Vigilance and dedication to safety led the EM program's disposition project team at the Separations Process Research Unit (SPRU) to achieve a milestone of one million hours - over two-and-a-half-years - without injury or illness resulting in time away from work.

199

DOE Awards Over a Billion Supercomputing Hours to Address Scientific  

Broader source: Energy.gov (indexed) [DOE]

Over a Billion Supercomputing Hours to Address Over a Billion Supercomputing Hours to Address Scientific Challenges DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges January 26, 2010 - 12:00am Addthis Washington, DC. - The U.S. Department of Energy announced today that approximately 1.6 billion supercomputing processor hours have been awarded to 69 cutting-edge research projects through the Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program. The INCITE program provides powerful resources to enable scientists and engineers to conduct cutting-edge research in just weeks or months rather than the years or decades needed previously. This facilitates scientific breakthroughs in areas such as climate change, alternative energy, life sciences, and materials science.

200

DOE Awards Over a Billion Supercomputing Hours to Address Scientific  

Broader source: Energy.gov (indexed) [DOE]

DOE Awards Over a Billion Supercomputing Hours to Address DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges January 26, 2010 - 12:00am Addthis Washington, DC. - The U.S. Department of Energy announced today that approximately 1.6 billion supercomputing processor hours have been awarded to 69 cutting-edge research projects through the Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program. The INCITE program provides powerful resources to enable scientists and engineers to conduct cutting-edge research in just weeks or months rather than the years or decades needed previously. This facilitates scientific breakthroughs in areas such as climate change, alternative energy, life

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Balancing Authority Cooperation Concepts - Intra-Hour Scheduling  

SciTech Connect (OSTI)

The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similar and/or unchanged among the scenarios.

Hunsaker, Matthew; Samaan, Nader; Milligan, Michael; Guo, Tao; Liu, Guangjuan; Toolson, Jacob

2013-03-29T23:59:59.000Z

202

DOE's Office of Science Awards 18 Million Hours of Supercomputing...  

Office of Environmental Management (EM)

Supercomputing Time to 15 Teams for Large-Scale Scientific Computing DOE's Office of Science Awards 18 Million Hours of Supercomputing Time to 15 Teams for Large-Scale Scientific...

203

SunShot Announces 24-Hour Solar Data Hackathon  

Broader source: Energy.gov [DOE]

SunShot will host a 24-hour solar data hackathon at the 2014 SunShot Grand Challenge Summit. Learn more over at the EERE blogand register here.

204

Pay and Leave Administration and Hours of Duty  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Order establishes requirements and responsibilities for the management of pay, including overtime and compensatory time, leave administration, and hours of duty. Cancels DOE O 322.1A. Canceled by DOE O 322.1C.

2005-01-14T23:59:59.000Z

205

Pay and Leave Administration and Hours of Duty  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements and responsibilities for the management of pay, including overtime pay and compensatory time, leave administration, time and attendance reporting, and hours of duty. Cancels DOE O 322.1B and DOE O 535.1

2011-01-19T23:59:59.000Z

206

Former Workers Medical Facilities with Experience Evaluating Chronic  

Broader source: Energy.gov (indexed) [DOE]

Former Workers Medical Facilities with Experience Evaluating Former Workers Medical Facilities with Experience Evaluating Chronic Beryllium Disease Former Workers Medical Facilities with Experience Evaluating Chronic Beryllium Disease April 2011 This document provides a listing of medical facilities within the United States with experience in evaluating Chronic Beryllium Disease (CBD). Because the medical community at large is not experienced in the evaluation and treatment of individuals with CBD, this list is offered to individuals in the Former Worker Medical Screening Program who have received an abnormal Beryllium Lymphocyte Proliferation Test and may need further medical monitoring for CBD. Former Worker Medical Facilities with Experience Evaluating Chronic Beryllium Disease More Documents & Publications

207

Former Worker Program - Joint Outreach Task Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Group Group Former Worker Medical Screening Program (FWP) The Joint Outreach Task Group (JOTG) includes representatives from HSS, Department of Labor (DOL), the National Institute for Occupational Safety and Health (NIOSH), the Offices of the Ombudsman for DOL and NIOSH, and the DOE-funded FWP projects. The JOTG was established in 2009 under the premise that agencies/programs with common goals can work together by combining resources and coordinating outreach efforts. Each involved agency has a different mission, but the missions are complementary. By working together, the agencies are better able to serve the DOE workforce. The JOTG focuses on educating the former workers on the programs and resources available to them. The JOTG has created a monthly calendar of community events to facilitate interagency and community involvement in these events.

208

IWTU Construction Workers Set Largest Process Vessel  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IWTU Construction Workers Set Largest Process Vessel IWTU Construction Workers Set Largest Process Vessel Click on image to enlarge Construction of the Integrated Waste Treatment Unit (IWTU) took a major step forward on Sept. 2, 2009 as crews lifted into place the largest of the six process vessels that will be used to treat radioactive liquid waste stored at the site. The IWTU will use a steam reforming process to solidify the waste for eventual shipment out of Idaho. The vessel and its skid, or framework, were constructed at Premier Technologies in Blackfoot. (Premier is the main small business partner for CH2M-WG Idaho (CWI), the contractor for DOE's Idaho Cleanup Project.) The Carbon Reduction Reformer vessel and skid weigh approximately 60 tons (120,000 lbs.). Because of the weight of the vessel and the location of the

209

Predicting Worker Exposure from a Glovebox Leak  

SciTech Connect (OSTI)

It is difficult to predict immediate worker radiological consequences from a hypothetical accident. This is recognized in DOE safety analysis guidance and the reason such guidance does not call for quantitative determinations of such consequences. However, it would be useful to at least have a means of systematically and formally quantifying worker dose to be able to identify the relative risks of various processes and to provide an order-of-magnitude impression of absolute consequences. In this report, we present such a means in the form of a simple calculation model that is easily applied and generates reasonable, qualitative dose predictions. The model contains a scaling parameter whose value was deduced from extensive laboratory ventilation flow rate measurements performed at Los Alamos National Laboratory (LANL) over the last several years and from recent indoor radioactive contamination dispersion measurements, also at LANL. Application of the model is illustrated with the aid of two example calculations.

H. Jordan; D. J. Gordon; J. J. Whicker; D. L. Wannigman

2001-05-01T23:59:59.000Z

210

Worker productivity rises with energy efficiency  

SciTech Connect (OSTI)

Many American companies have found that saving energy and cutting pollution dramatically improves the bottom line. But beyond these gains, businesses that launch energy efficiency programs to save money are often astonished to discover unforeseen benefits: energy efficient lighting, heating, cooling, motors, and industrial processes can increase worker productivity, decrease absenteeism, and improve the quality of work performed. Profits created by the jump in worker productivity can exceed energy savings by a factor of ten. Energy efficiency and pollution prevention represent the next wave in manufacturing, following the quality revolution launched by the Japanese in the 1960s. Unless America leads the lean and clean revolution, economic health will be undermined as other countries develop clean processes and products and US companies suffer competitively. Also, developing countries will leapfrog their wasteful model and buy products and manufacturing processes from foreign firms already practicing lean and clean.

Romm, J.J. (Dept. of Energy, Washington, DC (United States))

1995-01-01T23:59:59.000Z

211

Weldon Spring Plant, Former Construction Workers Screening Projects |  

Broader source: Energy.gov (indexed) [DOE]

Workers Screening Projects Workers Screening Projects Weldon Spring Plant, Former Construction Workers Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Weldon Spring Plant Worker Population Served: Construction workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied

212

Weldon Spring Plant, Former Construction Worker Screening Projects |  

Broader source: Energy.gov (indexed) [DOE]

Weldon Spring Plant, Former Construction Worker Screening Projects Weldon Spring Plant, Former Construction Worker Screening Projects Weldon Spring Plant, Former Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Weldon Spring Plant Worker Population Served: Construction workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied

213

Workers Deliver Award-Winning Respiratory Safety | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Workers Deliver Award-Winning Respiratory Safety Workers Deliver Award-Winning Respiratory Safety Workers Deliver Award-Winning Respiratory Safety April 2, 2013 - 12:00pm Addthis Workers wear air purifying respirators in the Plutonium Finishing Plant. Workers wear air purifying respirators in the Plutonium Finishing Plant. A program developed by employees enhances use of respiratory equipment in the Plutonium Finishing Plant. A program developed by employees enhances use of respiratory equipment in the Plutonium Finishing Plant. Workers wear air purifying respirators in the Plutonium Finishing Plant. A program developed by employees enhances use of respiratory equipment in the Plutonium Finishing Plant. RICHLAND, Wash. - Workers supporting the Richland Operations Office at the Hanford site found a way to make their everyday work even safer.

214

Recovery Act Workers Demolish Facility Tied to Project Pluto History |  

Broader source: Energy.gov (indexed) [DOE]

Recovery Act Workers Demolish Facility Tied to Project Pluto Recovery Act Workers Demolish Facility Tied to Project Pluto History Recovery Act Workers Demolish Facility Tied to Project Pluto History Workers recently razed a facility used in the historic Project Pluto, the latest American Recovery and Reinvestment Act accomplishment helping clean up traces of past nuclear testing at the Nevada National Security Site (NNSS). Recovery Act workers safely hauled the last demolition waste from the Pluto Disassembly Facility to disposal facilities Jan. 11. The project is slated for completion this spring after workers finish installing a concrete cap over the below-ground level where the facility stood. Recovery Act Workers Demolish Facility Tied to Project Pluto History More Documents & Publications 2010 ARRA Newsletters

215

Savannah River Site, Former Construction Worker Screening Projects |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site, Former Construction Worker Screening Projects Savannah River Site, Former Construction Worker Screening Projects Savannah River Site, Former Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: SRS Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Local Outreach Office: Charles Jernigan 1250 A Reynolds Street Augusta, GA 30901 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

216

Worker Protection Management for DOE Federal and Contractor Employees |  

Broader source: Energy.gov (indexed) [DOE]

Services » Program Management » Safety » Worker Protection Services » Program Management » Safety » Worker Protection Management for DOE Federal and Contractor Employees Worker Protection Management for DOE Federal and Contractor Employees This Order establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses and accidental losses by providing DOE Federal and contractor workers with a safe and healthful workplace. Worker Protection Management for DOE Federal and Contractor Employees More Documents & Publications CRAD, Machine Shop Safe Operations Assessment Plan Order Module--DOE O 440.1B, WORKER PROTECTION PROGRAM FOR DOE (INCLUDING NNSA) FEDERAL EMPLOYEES Audit Report: IG-0404 Waste Management Nuclear Materials & Waste Tank Waste and Waste Processing

217

Paducah Gaseous Diffusion Plant, Construction Worker Screening Project |  

Broader source: Energy.gov (indexed) [DOE]

Paducah Gaseous Diffusion Plant, Construction Worker Screening Paducah Gaseous Diffusion Plant, Construction Worker Screening Project Paducah Gaseous Diffusion Plant, Construction Worker Screening Project Project Name: Building Trades National Medical Screening Program Covered DOE Site: Paducah Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (888) 464-0009 Local Outreach Office: Joe Hudson 1930 North 13th Street Paducah, KY 42001 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

218

Outreach (Former Worker Medical Screening Program (FWP) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Outreach (Former Worker Medical Screening Program (FWP) Outreach (Former Worker Medical Screening Program (FWP) Outreach (Former Worker Medical Screening Program (FWP) Outreach: Identify and Notify Eligible DOE Workers About FWP Medical Screening Services All former DOE Federal, contractor, and subcontractor employees from all facilities are eligible to participate in the program. Although the historical best estimate for the population of former workers who are entitled to receive medical evaluations under the FWP is upwards of 600,000 individuals, the precise number of workers remains unknown. Most of the FWP projects use multiple outreach methods to increase the visibility of the program in communities surrounding DOE sites and to notify potentially eligible DOE workers about the availability of FWP services. These methods are three-fold: 1) roster-based, 2)

219

Fernald, Former Construction Worker Screening Projects | Department of  

Broader source: Energy.gov (indexed) [DOE]

Fernald, Former Construction Worker Screening Projects Fernald, Former Construction Worker Screening Projects Fernald, Former Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Fernald Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: 1-888-464-0009 Local Outreach Office: Lou Doll 1550 Chase Avenue Cincinnati, OH 45223 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

220

Waste Isolation Pilot Plant, Former Construction Worker Screening Projects  

Broader source: Energy.gov (indexed) [DOE]

Construction Worker Screening Construction Worker Screening Projects Waste Isolation Pilot Plant, Former Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: WIPP Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Brush Luckey Plant, Former Construction Worker Screening Projects |  

Broader source: Energy.gov (indexed) [DOE]

Brush Luckey Plant, Former Construction Worker Screening Projects Brush Luckey Plant, Former Construction Worker Screening Projects Brush Luckey Plant, Former Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Brush Luckey Plant Worker Population Served: Construction workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: 1-888-464-0009 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied

222

Worker Safety and Health News | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

About Us » News & Blog » Enforcement News » Worker Safety and About Us » News & Blog » Enforcement News » Worker Safety and Health News Worker Safety and Health News August 29, 2013 Department of Energy Cites Brookhaven Science Associates, LLC for Worker Safety and Health Violations The U.S. Department of Energy has issued a Preliminary Notice of Violation to Brookhaven Science Associates, LLC for two violations of the Department's worker safety and health regulations. November 9, 2012 Department of Energy Cites Savannah River Nuclear Solutions, LLC for Worker Safety and Health Violations The U.S. Department of Energy has issued a Preliminary Notice of Violation to Savannah River Nuclear Solutions, LLC for violations of the Department's worker safety and health regulations. October 4, 2012 Department of Energy Cites Battelle Energy Alliance, LLC for Nuclear Safety

223

Former Worker Medical Screening Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Former Worker Medical Screening Former Worker Medical Screening Program Former Worker Medical Screening Program The Former Worker Medical Screening Program (FWP) provides ongoing medical screening examinations, at no cost, to all former DOE Federal, contractor, and subcontractor workers who may be at risk for occupational diseases. The FWP is supported by the U.S. Department of Energy's (DOE) Office of Health, Safety and Security (HSS) and reflects our commitment to the health and safety of all DOE workers - past and present - who have served the Nation in its National security and other missions. The FWP was established following the issuance of the National Defense Authorization Act for Fiscal Year 1993 (PL 102-484), which called for DOE to assist workers with determining whether they had health issues related

224

DOE Headquarters Review Focuses on Improved LATA Kentucky Worker Safety |  

Broader source: Energy.gov (indexed) [DOE]

Headquarters Review Focuses on Improved LATA Kentucky Worker Headquarters Review Focuses on Improved LATA Kentucky Worker Safety DOE Headquarters Review Focuses on Improved LATA Kentucky Worker Safety July 1, 2012 - 12:00pm Addthis Kevin Dressman, director of the DOE Office of Worker Safety and Health Enforcement, addresses LATA Kentucky employees during a training session. The June regulatory assistance review was aimed at ensuring worker safety. Kevin Dressman, director of the DOE Office of Worker Safety and Health Enforcement, addresses LATA Kentucky employees during a training session. The June regulatory assistance review was aimed at ensuring worker safety. PADUCAH, Ky. - DOE Office of Health, Safety and Security headquarters representatives recently spent three days at the Paducah site helping EM cleanup contractor LATA Kentucky better identify and correct issues before

225

Former Worker Program - FWP Scientific Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FWP Scientific Publications FWP Scientific Publications Former Worker Medical Screening Program (FWP) Scientific publications either directly studying former workers in the context of the screening program or recruiting former workers in the program as research participants for scientific studies funded by the National Institutes of Health or other research funding sources are summarized below according to publication date. Mikulski M., Gerke A., Lourens S., Czeczok T., Sprince N., Laney A., Fuortes L. Agreement between fixed-ratio and lower limit of normal spirometry interpretation protocols decreases with age - Is there a need for a new gold standard? Journal of Occupational and Environmental Medicine, 55(7): 802-808, 2013. To assess concordance between the fixed 70% ratio cutoff point with the fixed percent predicted values (Fixed-ratio) and the lower limit of normal (LLN) algorithms in interpreting spirometry results in an older population, spirometries were interpreted using Third National Health and Nutrition Examination Survey reference equations for 2,319 workers. The Fixed-ratio algorithm characterized 34.5% (n=801) results as abnormal, compared with 29.7% (n=689) by the LLN. There were almost twice as many obstructive and mixed airways spirometries identified under the Fixed-ratio compared to LLN. Rates of restrictive pattern physiology were virtually the same under each algorithm. Overall agreement between the algorithms decreased with age from "almost perfect" for those younger than 60 years to "substantial" for those older than 80 years. This study found age-related discordance between two algorithms possibly related to the lack of reference equations and standards for individuals older than 80 years.

226

2011 Beryllium-Associated Worker Registry Summary  

Broader source: Energy.gov [DOE]

The DOE Beryllium-Associated Worker Registry (BAWR) is a collection of health and exposure information of individuals potentially at risk for chronic beryllium disease (CBD) due to their work at DOE-owned or leased facilities. The BAWR is a risk management tool for sites to use in managing their CBD prevention programs and other risk management operations. Sites are encouraged to use their Registry data to evaluate beryllium exposure risks. (Reported data are cumulative through September 2011.)

227

2012 Beryllium-Associated Worker Registry Summary  

Broader source: Energy.gov [DOE]

The DOE Beryllium-Associated Worker Registry (BAWR) is a collection of health and exposure information of individuals potentially at risk for chronic beryllium disease (CBD) due to their work at DOE-owned or leased facilities. The BAWR is a risk management tool for sites to use in managing their CBD prevention programs and other risk management operations. Sites are encouraged to use their Registry data to evaluate beryllium exposure risks. (Reported data are cumulative through calendar year 2012.)

228

Form EIA-930 HOURLY AND DAILY BALANCING AUTHORITY OPERATIONS REPORT  

U.S. Energy Information Administration (EIA) Indexed Site

930 930 HOURLY AND DAILY BALANCING AUTHORITY OPERATIONS REPORT INSTRUCTIONS Due Date: mm/dd/yyyy Approved: OMB No. 1905-0129 Approval Expires: 10/31/2016 Burden: 0.19 hours Page 1 Draft for Discussion only PURPOSE Form EIA-930 requires Internet posting of hourly balancing authority operating data. The posted data are used to monitor the current status and trends of the electric power industry, and to support enhancement of electric system operations. REQUIRED RESPONDENTS For the contiguous United States: all entities that are listed in NERC's Compliance Registry as a balancing authority must post balancing authority operating information required by this survey. Other than the Midwest ISO (MISO), registered balancing authorities that are parties

229

Hourly Energy Emission Factors for Electricity Generation in the United  

Open Energy Info (EERE)

Hourly Energy Emission Factors for Electricity Generation in the United Hourly Energy Emission Factors for Electricity Generation in the United States Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. This project utilized GridViewTM, an electric grid dispatch software package, to estimate hourly emission factors for all of the eGRID subregions in the continental United States. These factors took into account electricity imports and exports

230

INCITE Program Doles Out Hours on Supercomputers | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

INCITE Program Doles Out Hours on Supercomputers INCITE Program Doles Out Hours on Supercomputers INCITE Program Doles Out Hours on Supercomputers November 5, 2012 - 1:30pm Addthis Mira, the 10-petaflop IBM Blue Gene/Q system at Argonne National Laboratory, is capable of carrying out 10 quadrillion calculations per second. Each year researchers apply to the INCITE program to get to use this machine's incredible computing power. | Photo courtesy of Argonne National Lab. Mira, the 10-petaflop IBM Blue Gene/Q system at Argonne National Laboratory, is capable of carrying out 10 quadrillion calculations per second. Each year researchers apply to the INCITE program to get to use this machine's incredible computing power. | Photo courtesy of Argonne National Lab. Charles Rousseaux Charles Rousseaux Senior Writer, Office of Science

231

Collaborative Worker Health and Safety Improvement Activities | Department  

Broader source: Energy.gov (indexed) [DOE]

Collaborative Worker Health and Safety Improvement Activities Collaborative Worker Health and Safety Improvement Activities Collaborative Worker Health and Safety Improvement Activities Worker health and safety programs at DOE are most effective when they reflect the knowledge and experience of the Department's frontline workers. "Our workers are the lifeblood of accomplishing the Department's mission at DOE sites, and as such, ensuring their safety is foremost," explains Glenn Podonsky, Chief Health, Safety and Security Officer. "It is imperative that we communicate and establish relationships with those elements that train, manage and represent our workforce to improve the safety culture at DOE sites." Meeting Documents Available for Download November 30, 2012 Health and Productivity Questionnaire (HPQ) Survey Report

232

Bush Administration to Expand Department of Energy Former Worker Medical  

Broader source: Energy.gov (indexed) [DOE]

to Expand Department of Energy Former Worker to Expand Department of Energy Former Worker Medical Screening Program Bush Administration to Expand Department of Energy Former Worker Medical Screening Program February 9, 2005 - 10:05am Addthis Estimates project that over 25,000 additional workers will receive screening Program Fact Sheet [PDF] U.S. Map of Medical Screening Sites [GIF] WASHINGTON, D.C. - U.S. Secretary of Energy Samuel W. Bodman today announced that the Bush administration will add nine additional medical screening centers as part of the department's Former Worker Medical Screening Program at no additional cost to the taxpayer. Under this expansion, the Former Worker Medical Screening Program will offer all former Energy Department employees, contractors and subcontractors free medical examinations to determine if possible exposure to harmful

233

Iowa Army Ammunition Plant, Former Production Workers Screening Projects |  

Broader source: Energy.gov (indexed) [DOE]

Plant, Former Production Workers Screening Plant, Former Production Workers Screening Projects Iowa Army Ammunition Plant, Former Production Workers Screening Projects Project Name: Medical Monitoring of Former Atomic Weapons Workers at the Iowa Army Ammunition Plant (IAAP) in Burlington, Iowa Covered DOE Site: IAAP Worker Population Served: All Line 1/Division B Workers Principal Investigator: Laurence Fuortes, MD Toll-free Telephone: (866) 282-5818 Local Medical Clinics: University of Iowa Hospitals and Clinics 200 Hawkins Drive Iowa City, IA 52242 Henry County Health Center 407 South White Street Mt. Pleasant, IA 62641 Great River Medical Center 1221 S. Gear Avenue West Burlington, IA 52655 Website: http://cph.uiowa.edu/iowafwp/ This project is intended to screen for occupational health conditions among

234

Constant time worker thread allocation via configuration caching  

DOE Patents [OSTI]

Mechanisms are provided for allocating threads for execution of a parallel region of code. A request for allocation of worker threads to execute the parallel region of code is received from a master thread. Cached thread allocation information identifying prior thread allocations that have been performed for the master thread are accessed. Worker threads are allocated to the master thread based on the cached thread allocation information. The parallel region of code is executed using the allocated worker threads.

Eichenberger, Alexandre E; O'Brien, John K. P.

2014-11-04T23:59:59.000Z

235

Navy Estimated Average Hourly Load Profile by Month (in MW)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Navy Estimated Average Hourly Load Profile by Month (in MW) MONTH HE1 HE2 HE3 HE4 HE5 HE6 HE7 HE8 HE9 HE10 HE11 HE12 HE13 HE14 HE15 HE16 HE17 HE18 HE19 HE20 HE21 HE22 HE23 HE24...

236

BIOLOGY 650 (credit 2 hours) Animal Physiology LABORATORY  

E-Print Network [OSTI]

BIOLOGY 650 (credit 2 hours) Animal Physiology LABORATORY Spring 2011 Instructor: ROBIN COOPER , Ph role of ion channels and transporters in regulation of the membrane potential will be covered in great-neuron communication through electrical and chemical synapses will be examined in live preparations. The historical

Cooper, Robin L.

237

Aegis Combat and Weapon Systems Overview 24 hours, $1495  

E-Print Network [OSTI]

Aegis Combat and Weapon Systems Overview 24 hours, $1495 Launched from the Advanced Surface Missile that led to the initiation of Aegis. Topics Include: · AegisOverviewandHistory · AegisBMD · AegisWeaponSEprocessensuresthatsystemsaredevelopedtomeet affordable, operationally effective, and timely mission objectives. FocusonengineeringtheWeapon

Fork, Richard

238

BRASENOSE COLLEGE 8-HOUR STIPENDIARY LECTURERSHIP IN PHILOSOPHY  

E-Print Network [OSTI]

BRASENOSE COLLEGE OXFORD 8-HOUR STIPENDIARY LECTURERSHIP IN PHILOSOPHY FURTHER PARTICULARS in Philosophy at Brasenose College, Oxford. The post is tenable from 1 October 2013 (finishing date: 31st information about the College can be found at www.bnc.ox.ac.uk. Brasenose has a strong tradition in Philosophy

Oxford, University of

239

Folding Proteins at 500 ns/hour with Work Queue  

E-Print Network [OSTI]

in part to the unbiased nature of these simulations: the low-energy regions of the free-energy landscape to achieve an aggregate sampling rate of over 500 ns/hour. As a comparison, a single process typically are oversampled while the (arguably more interesting) high-energy tran- sition regions are rarely observed

Thain, Douglas

240

Credit Based; Intermediate Swimming Credit/Hours Class  

E-Print Network [OSTI]

Center Pool Course Description: Intermediate stroke and swimming skills Prerequisites: Must have by swimming laps during open swim/lap swim at MSU pool. Lap swim times are available online or at the frontCredit Based; Intermediate Swimming Credit/Hours Class Title Lead Instructor Phone Email Office

Maxwell, Bruce D.

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Credit Based; Intermediate Swimming Credit/Hours Class  

E-Print Network [OSTI]

at the meet. 3) Swim laps during open swim/lap swim at MSU pool. A sheet will be posted on D2l that you. Emergency phone B. Pool Rules C key swimming skills 1. Breathing 2. Floating/body position 3. Treading waterCredit Based; Intermediate Swimming Credit/Hours Class Title Lead Instructor Phone Email Office

Maxwell, Bruce D.

242

Pay and Leave Administration and Hours of Duty  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements and responsibilities for the management of pay, including overtime pay and compensatory time, leave administration, time and attendance reporting, and hours of duty. Cancels DOE O 322.1B and DOE O 535.1. Admin Chg 1, dated 5-10-12, cancels DOE O 322.1C.

2011-01-19T23:59:59.000Z

243

Workers Create Demolition Zone at Hanford Site's Plutonium Finishing...  

Broader source: Energy.gov (indexed) [DOE]

Create Demolition Zone at Hanford Site's Plutonium Finishing Plant Workers Create Demolition Zone at Hanford Site's Plutonium Finishing Plant August 28, 2014 - 12:00pm Addthis The...

244

Lineman shares life-saving skills with electrical workers in...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lineman-shares-life-saving-skills-with-electrical-workers-in-Suriname Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects &...

245

Workers' Spotlight Newsletter - Issue 7 | Department of Energy  

Office of Environmental Management (EM)

May 2013 issue covers: WHPP and BTMed Roster Updates Director's Note Staff Trivia WHPP Video Acknowledgement. Calendar Workers' Spotlight Newsletter - Issue 7 More Documents &...

246

Medical Screening Protocol for the Former Worker Medical Screening...  

Office of Environmental Management (EM)

Medical Screening Program (FWP) is to provide interested former workers with targeted testing to screen for selected adverse health effects potentially related to their work in...

247

Worker Safety and Health Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Safety and Health Program Worker Safety and Health Program The DOE Safety and Health Program supports line management and contractors through the development and dissemination of...

248

Bush Administration to Expand Department of Energy Former Worker...  

Energy Savers [EERE]

Providing this screening is the first step in getting these former workers the medical care they so rightly deserve," Secretary Bodman said. The Fiscal Year 2005 Budget...

249

Beryllium-Associated Worker Registry Data Collection and Management...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Worker Registry Data Collection and Management Guidance U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release;...

250

Worker Safety and Health Enforcement Documents | Department of...  

Office of Environmental Management (EM)

Portsmouth, LLC June 20, 2014 Preliminary Notice of Violation, Battelle Energy Alliance, LLC Worker Safety and Health Preliminary Notice of Violation issued to Battelle...

251

Released: June 2006  

U.S. Energy Information Administration (EIA) Indexed Site

. Summary Table: Totals and Medians of Floorspace, Number of Workers, and Hours of Operation for Non-Mall Buildings, 2003" . Summary Table: Totals and Medians of Floorspace, Number of Workers, and Hours of Operation for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)","Total Floorspace (million square feet)","Total Workers in All Buildings (thousand)","Median Square Feet per Building (thousand)","Median Square Feet per Worker","Median Hours per Week","Median Age of Buildings (years)" "All Buildings* ...............",4645,64783,72807,4.6,1000,50,30.5 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2552,6789,9936,2.4,750,48,30.5 "5,001 to 10,000 ..............",889,6585,7512,7.2,1300,50,30.5 "10,001 to 25,000 .............",738,11535,10787,15,1611,55,28.5

252

Former Worker Medical Screening Program 2012 Annual Report  

Broader source: Energy.gov (indexed) [DOE]

Published February 2013 Published February 2013 Pu Pu Publ b blis s ishe he hed d d Fe Fe Febr br brua ua u ry ry 2 201 013 3 FORMER WORKER MEDICAL SCREENING PROGRAM ANNUAL REPORT ANNUAL REPORT 2 0 1 2 STC STONETURN CONSULTANTS 2012 Former Worker Medical Screening Program * i Table of Contents Abbreviations ............................................................................................................................................iii Foreword .................................................................................................................................................... v Executive Summary .................................................................................................................................

253

Former Worker Program - Early Lung Cancer Detection Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Former Worker Program (FWP) Former Worker Program (FWP) Home Covered Sites/Populations › Construction Worker Screening Projects › Production Worker Screening Projects › Supplemental Screening Program › Beryllium Vendor Screening Program Upcoming Events Program Implementation Outreach Medical Screening - Conventional Medical Screening - Early Lung Cancer Detection Communicating Results Protecting Participant Information Sharing De-identified Data Chronic Beryllium Disease Awareness Joint Outreach Task Group (JOTG) Worker Testimonials Contact Us FWP Scientific Publications FWP Documents Related Links Office of Health and Safety Home Page HSS Logo Early Lung Cancer Detection Program Former Worker Medical Screening Program (FWP) Since 2000, DOE has made screening for occupational lung cancer with low-dose helical computed tomography (CT) scans available to workers at high risk for lung cancer. Because former workers undertook essential activities to fulfill the Department's mission, many of them were at risk for lung cancer. Through the FWP, DOE initiated the Early Lung Cancer Detection (ELCD) program using low-dose helical CT scans to detect lung cancers at an earlier, more treatable stage. Lung cancer results in about 160,000 deaths in the U.S. every year. The most common causes of lung cancer are long-term exposures to tobacco smoke and residential radon emissions, but occupational hazards, such as asbestos and ionizing radiation, also cause or contribute to the disease.

254

Worker Protection Management for DOE Federal and Contractor Employees  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes the framework for an effective worker protection program that will reduce or prevent accidental losses, injuries, and illnesses by providing DOE Federal and contractor workers with a safe and healthful workplace. Chg 1, 10-26-95; Chg 2, 10-26-96.

1995-09-30T23:59:59.000Z

255

Toxic Inhalation Fatalities of US Construction Workers, 1990 to 1999  

E-Print Network [OSTI]

space standard could save lives, particularly among water, sewer, and utility line industry workers. (J numbers of fatalities. The majority of these deaths occurred in confined spaces. Water, sewer, and utility line workers are at increased risk for poisoning fatality. Toxic inhalation fatalities

Illinois at Chicago, University of

256

Cataracts in retired actinide-exposed radiation workers  

Science Journals Connector (OSTI)

......suggest that the radiation safety standards set for workers...Hanford site, 33 from the Rocky Flats facility and 11 from Los...suggest that the radiation safety standards set for workers...Hanford site, 33 from the Rocky Flats facility and 11 from Los......

Baruch S. Jacobson

2005-04-01T23:59:59.000Z

257

Worker Safety and Health Enforcement Consent Order  

Broader source: Energy.gov (indexed) [DOE]

6, 2011 6, 2011 Mr. Thomas J. Dieter, President CH2M-WG Idaho, LLC MS 9101 1580 Sawtelle Street Idaho Falls, Idaho 83403 WC0-2011-01 Dear Mr. Dieter: The Office of Health Safety and Security's Office of Enforcement and Oversight has completed its investigation into the facts and circumstances associated with the October 4, 2010, hoisting incident that occurred when a telescopic hydraulic gantry system tipped while lifting a 7 ,800-pound shield plug at the Sodium Bearing Waste Treatment Project (SBWTP) located at the U.S. Department of Energy's Idaho National Laboratory. The results of the investigation were provided to CH2M-WG Idaho, LLC (CWI) in an Investigation Report, dated April20, 2011, and identified potential violations of DOE requirements established at 10 C.F.R. Part 851, Worker Safety and

258

Honoring Nuclear Security Workers on the National Day of Remembrance |  

Broader source: Energy.gov (indexed) [DOE]

Honoring Nuclear Security Workers on the National Day of Honoring Nuclear Security Workers on the National Day of Remembrance Honoring Nuclear Security Workers on the National Day of Remembrance October 31, 2011 - 11:54am Addthis Workers dismantle a remaining B53, ensuring that the system will never again be part of the U.S. nuclear weapons stockpile. | Credit: NNSA photo Workers dismantle a remaining B53, ensuring that the system will never again be part of the U.S. nuclear weapons stockpile. | Credit: NNSA photo Secretary Chu Secretary Chu Former Secretary of Energy On October 30th, our nation honored the men and women who have served and sacrificed to support America's nuclear security mission. From World War II, through the dark days of the Cold War, to the present day, these patriots have worked to keep our country safe and secure.

259

Recovery Act Workers Clear Reactor Shields from Brookhaven Lab | Department  

Broader source: Energy.gov (indexed) [DOE]

Workers Clear Reactor Shields from Brookhaven Lab Workers Clear Reactor Shields from Brookhaven Lab Recovery Act Workers Clear Reactor Shields from Brookhaven Lab American Recovery and Reinvestment Act workers are in the final stage of decommissioning a nuclear reactor after they recently removed thick steel shields once used to absorb neutrons produced for research. The Brookhaven National Laboratory is using $39 million from the Recovery Act to decommission the Brookhaven Graphite Research Reactor, the world's first reactor built solely for peaceful research purposes. Recovery Act Workers Clear Reactor Shields from Brookhaven Lab More Documents & Publications Brookhaven Graphite Research Reactor Workshop 2011 ARRA Newsletters Idaho Crews Overcome Challenges to Safely Dispose 1-Million-Pound Hot Cell

260

New Jersey Training Workers to Weatherize Homes | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Jersey Training Workers to Weatherize Homes Jersey Training Workers to Weatherize Homes New Jersey Training Workers to Weatherize Homes March 15, 2010 - 6:46pm Addthis Paul Lester Communications Specialist for the Office of Energy Efficiency and Renewable Energy What does this mean for me? Recovery Act-funded training programs will create weatherization workforce for hundreds and lower bills for low-income residents. New Jersey is training an army of weatherization workers as the state surges ahead with plans to weatherize 13,000 homes, shrinking bills for low-income residents and creating hundreds of jobs. The goal is to develop the "weatherization workforce with family supporting wages" and create "career ladders which will move low-income workers into higher-skilled occupations," says Lisa Ryan, public

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Idaho Workers Complete Last of Transuranic Waste Transfers Funded by  

Broader source: Energy.gov (indexed) [DOE]

Workers Complete Last of Transuranic Waste Transfers Funded Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act Idaho Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act American Recovery and Reinvestment Act workers successfully transferred 130 containers of remote-handled transuranic waste – each weighing up to 15 tons – to a facility for repackaging and shipment to a permanent disposal location. As part of a project funded by $90 million from the Recovery Act, the final shipment of the containers from the Materials and Fuels Complex recently arrived at the Idaho Nuclear Technology and Engineering Center (INTEC). Idaho Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act More Documents & Publications EIS-0203-SA-03: Supplement Analysis

262

Recovery Act Workers Demolish Facility Tied to Project Pluto History |  

Broader source: Energy.gov (indexed) [DOE]

Demolish Facility Tied to Project Pluto Demolish Facility Tied to Project Pluto History Recovery Act Workers Demolish Facility Tied to Project Pluto History Workers recently razed a facility used in the historic Project Pluto, the latest American Recovery and Reinvestment Act accomplishment helping clean up traces of past nuclear testing at the Nevada National Security Site (NNSS). Recovery Act workers safely hauled the last demolition waste from the Pluto Disassembly Facility to disposal facilities Jan. 11. The project is slated for completion this spring after workers finish installing a concrete cap over the below-ground level where the facility stood. Recovery Act Workers Demolish Facility Tied to Project Pluto History More Documents & Publications 2010 ARRA Newsletters 2011 ARRA Newsletters

263

Workers Demolish Metals Plant at Paducah Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Demolish Metals Plant at Paducah Site Demolish Metals Plant at Paducah Site Workers Demolish Metals Plant at Paducah Site February 21, 2013 - 12:00pm Addthis The Metals Plant is shown before workers removed panels from the structure ln 2012. The Metals Plant is shown before workers removed panels from the structure ln 2012. Workers remove panels from the Metals Plant in September 2012. Workers remove panels from the Metals Plant in September 2012. About half of the complex was demolished by the end of December 2012, ahead of schedule. About half of the complex was demolished by the end of December 2012, ahead of schedule. An ultra-high-reach demolition machine — similar to equipment used to demolish Yankee Stadium — cuts into upper portions of the building’s last standing section late last month.

264

Wind Projects Providing Hope for Penn. Workers | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Wind Projects Providing Hope for Penn. Workers Wind Projects Providing Hope for Penn. Workers Wind Projects Providing Hope for Penn. Workers March 8, 2010 - 11:28am Addthis Joshua DeLung The Recovery Act made three large-scale wind projects possible in Pennsylvania, and employees at Gamesa Wind are back to work filling orders for them. $22.8 million in stimulus grants are putting 79 laid-off employees back on the job and making it possible for Gamesa to hire 50 additional workers at its other Pennsylvania locations. Gov. Edward Rendell has also announced that 257 jobs will be created at three wind farms across Pennsylvania. In that state, as well as many across the country, the Recovery Act helped avoid massive layoffs, provided relief to families in need, trained people for green jobs and enabled employers to hire workers doing jobs that are

265

Workers Deliver Award-Winning Respiratory Safety | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Deliver Award-Winning Respiratory Safety Deliver Award-Winning Respiratory Safety Workers Deliver Award-Winning Respiratory Safety April 2, 2013 - 12:00pm Addthis Workers wear air purifying respirators in the Plutonium Finishing Plant. Workers wear air purifying respirators in the Plutonium Finishing Plant. A program developed by employees enhances use of respiratory equipment in the Plutonium Finishing Plant. A program developed by employees enhances use of respiratory equipment in the Plutonium Finishing Plant. Workers wear air purifying respirators in the Plutonium Finishing Plant. A program developed by employees enhances use of respiratory equipment in the Plutonium Finishing Plant. RICHLAND, Wash. - Workers supporting the Richland Operations Office at the Hanford site found a way to make their everyday work even safer.

266

10 C.F.R. Part 851, Worker Safety and Health Program - February...  

Office of Environmental Management (EM)

10 C.F.R. Part 851, Worker Safety and Health Program - February 9, 2006 10 C.F.R. Part 851, Worker Safety and Health Program - February 9, 2006 10 C.F.R. 851 establishes the worker...

267

Beryllium contamination inside vehicles of machine shop workers  

SciTech Connect (OSTI)

Inhalation of beryllium particles causes a chronic, debilitating lung disease--chronic beryllium disease (CBD)--in immunologically sensitized workers. Evidence that very low concentrations of beryllium may initiate this chronic disease is provided by incidences of the illness in family members exposed to beryllium dust from workers` clothes and residents in neighborhoods surrounding beryllium refineries. This article describes the results of a cross-sectional survey to evaluate potential take-home beryllium exposures by measuring surface concentrations on the hands and in vehicles of workers at a precision machine shop where cases of CBD had recently been diagnosed. Many workers did not change out of their work clothes and shoes at the end of their shift, increasing the risk of taking beryllium home to their families. Wipe samples collected from workers` hands and vehicle surfaces were analyzed for beryllium content by inductively coupled argon plasma-atomic emission spectroscopy (ICP-AES). The results ranged widely, from nondetectable to 40 {micro}g/ft{sup 2} on workers` hands and up to 714 {micro}g/fg{sup 2} inside their vehicles, demonstrating that many workers carried residual beryllium on their hands and contaminated the inside of their vehicles when leaving work. The highest beryllium concentrations inside the workers` vehicles were found on the drivers` floor (GM = 19 {micro}g/ft{sup 2}, GSD = 4.9), indicating that workers were carrying beryllium on their shoes into their vehicles. A safe level of beryllium contamination on surfaces is not known, but it is prudent to reduce the potential for workers to carry beryllium away from the work site.

Sanderson, W.T. [National Inst. for Occupational Safety and Health, Cincinnati, OH (United States). Div. of Surveillance, Hazard Evaluations, and Field Studies] [National Inst. for Occupational Safety and Health, Cincinnati, OH (United States). Div. of Surveillance, Hazard Evaluations, and Field Studies; Henneberger, P.K. [National Inst. for Occupational Safety and Health, Morgantown, WV (United States). Div. of Respiratory Disease Studies] [National Inst. for Occupational Safety and Health, Morgantown, WV (United States). Div. of Respiratory Disease Studies; Martyny, J. [Tri-County Health Dept., Commerce, CO (United States)] [Tri-County Health Dept., Commerce, CO (United States); Ellis, K. [Colorado State Univ., Fort Collins, CO (United States). Dept. of Environmental Health] [Colorado State Univ., Fort Collins, CO (United States). Dept. of Environmental Health; Mroz, M.M. [National Jewish Medical and Research Center, Denver, CO (United States)] [National Jewish Medical and Research Center, Denver, CO (United States); Newman, L.S. [National jewish Medical and Research Center, Denver, CO (United States)] [National jewish Medical and Research Center, Denver, CO (United States); [Univ. of Colorado School of Medicine, Denver, CO (United States)

1999-04-01T23:59:59.000Z

268

E-Print Network 3.0 - animal health workers Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

must be Summary: Ventilation Mechanic Waste Water Treatment Plant Operator III III. Health Care Workers Health care workers... descriptions under "Work Environment." For more...

269

20140301-0331_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Mar to 31 Mar 2014.

Thibedeau, Joe

2014-04-07T23:59:59.000Z

270

20140601-0630_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 June to 30 June 2014.

Thibedeau, Joe

2014-06-30T23:59:59.000Z

271

20140701-0731_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 July to 31 July 2014.

Thibedeau, Joe

2014-07-31T23:59:59.000Z

272

20131201-1231_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Dec to 31 Dec 2013.

Thibedeau, Joe

2014-01-08T23:59:59.000Z

273

20140201-0228_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Feb to 28 Feb 2014.

Thibedeau, Joe

2014-03-03T23:59:59.000Z

274

20140501-0531_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 May to 31 May 2014.

Thibedeau, Joe

2014-06-02T23:59:59.000Z

275

20131101-1130_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Nov to 30 Nov 2013.

Thibedeau, Joe

2013-12-02T23:59:59.000Z

276

20130801-0831_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 8/1/13 to 8/31/13.

Vanderhoff, Alex

2013-09-10T23:59:59.000Z

277

20130901-0930_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 September 2013 to 30 September 2013.

Thibedeau, Joe

2013-10-25T23:59:59.000Z

278

20131001-1031_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 Oct 2013 to 31 Oct 2013.

Thibedeau, Joe

2013-11-05T23:59:59.000Z

279

20140101-0131_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Jan to 31 Jan 2014.

Thibedeau, Joe

2014-02-03T23:59:59.000Z

280

20130501-20130531_Green Machine Florida Canyon Hourly Data  

SciTech Connect (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from May 2013

Vanderhoff, Alex

2013-06-18T23:59:59.000Z

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

20140201-0228_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Feb to 28 Feb 2014.

Thibedeau, Joe

282

20131101-1130_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Nov to 30 Nov 2013.

Thibedeau, Joe

283

20140301-0331_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Mar to 31 Mar 2014.

Thibedeau, Joe

284

20131001-1031_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 Oct 2013 to 31 Oct 2013.

Thibedeau, Joe

285

20140601-0630_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 June to 30 June 2014.

Thibedeau, Joe

286

20131201-1231_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Dec to 31 Dec 2013.

Thibedeau, Joe

287

20130801-0831_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 8/1/13 to 8/31/13.

Vanderhoff, Alex

288

20130501-20130531_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from May 2013

Vanderhoff, Alex

289

20140701-0731_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 July to 31 July 2014.

Thibedeau, Joe

290

20140101-0131_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Jan to 31 Jan 2014.

Thibedeau, Joe

291

20140501-0531_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 May to 31 May 2014.

Thibedeau, Joe

292

20130901-0930_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 September 2013 to 30 September 2013.

Thibedeau, Joe

293

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Cuba from NREL Cuba from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year.. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

294

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Nepal from NREL Nepal from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year.. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

295

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Kenya from NREL Kenya from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year.. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

296

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

China from NREL China from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

297

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Bangladesh stations from NREL Bangladesh stations from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year.. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

298

Former Worker Medical Screening Program Related Documents & Links |  

Broader source: Energy.gov (indexed) [DOE]

Former Former Worker Medical Screening Program Related Documents & Links Former Worker Medical Screening Program Related Documents & Links Related Documents & Links Beryllium Information-ORISE Chronic Beryllium Disease Information-National Jewish Health Department of Energy Human Subjects Protection Program DOE Covered Facilities Database Department of Labor Energy Employees Occupational Illness Compensation Program (EEOICP) Department of Labor EEOICP - Upcoming Events Department of Labor Office of the Ombudsman for EEOICPA NIOSH Advisory Board and Public Meetings NIOSH Division of Compensation Analysis and Support Project Websites Building Trades National Medical Screening Program Medical Exam Program for Former Workers at Los Alamos National Laboratory

299

Radiological Worker Training - Radiological Control Training for Supervisors  

Broader source: Energy.gov (indexed) [DOE]

A A December 2008 DOE HANDBOOK Radiological Worker Training Radiological Control Training for Supervisors U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE Radiological Worker Training - Appendix A Radiological Control Training for Supervisors DOE-HDBK-1130-2008 ii This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ Radiological Worker Training - Appendix A Radiological Control Training for Supervisors DOE-HDBK-1130-2008 iii Foreword This Handbook describes an implementation process for training as recommended in

300

Department of Energy Cites URS -Washington Division for Worker Safety  

Broader source: Energy.gov (indexed) [DOE]

Cites URS -Washington Division for Worker Cites URS -Washington Division for Worker Safety Violations Department of Energy Cites URS -Washington Division for Worker Safety Violations October 4, 2011 - 9:53am Addthis WASHINGTON, D.C. - The U.S. Department of Energy (DOE) has issued a Preliminary Notice of Violation (PNOV) to URS -Washington Division (URS-WD) based on an investigation of an October 2010 incident at the DOE Idaho Site. The PNOV cites URS-WD with two violations of the Department's worker safety and health regulations associated with a hoisting incident that occurred when a telescopic hydraulic gantry system (THGS) tipped while lifting a 7,800 pound shield plug at the Sodium Bearing Waste Treatment Project (SBWTP). The Department has proposed a $150,000 civil penalty. The hoisting incident revealed multiple breakdowns in job execution and

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Company Rehires Unemployed Workers for Energy Efficient Window Project |  

Broader source: Energy.gov (indexed) [DOE]

Company Rehires Unemployed Workers for Energy Efficient Window Company Rehires Unemployed Workers for Energy Efficient Window Project Company Rehires Unemployed Workers for Energy Efficient Window Project August 20, 2010 - 12:57pm Addthis Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Recovery Act grant funded $478,000 project for Kitsap County. Courthouse to save $25,000 per year with 95 new windows. Local vendor Pacific Glass rehires five workers. "Our labor force has fluctuated up and down this year due to the economy," said Pacific Glass President Bernie Thueringer. Thueringer and domestic frame and glass suppliers Efco Corp and Old Castle Glass have seen new business from a Recovery Act funded energy efficiency project in Kitsap County, Washington. "We were excited about this project because we were able to bring five of

302

Department of Energy Cites Brookhaven Science Associates, LLC for Worker  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Cites Brookhaven Science Associates, LLC for Department of Energy Cites Brookhaven Science Associates, LLC for Worker Safety and Health Violations Department of Energy Cites Brookhaven Science Associates, LLC for Worker Safety and Health Violations August 29, 2013 - 3:30pm Addthis News Media Contact (202) 586-4940 WASHINGTON - The U.S. Department of Energy (DOE) has issued a Preliminary Notice of Violation (PNOV) to Brookhaven Science Associates, LLC (BSA) for two violations of the Department's worker safety and health regulations. As part of the Energy Department's commitment to worker safety, DOE's enforcement program holds contractors accountable for meeting regulatory requirements and maintaining a safe and healthy workplace. The violations are associated with a November 29, 2011, fall injury event

303

Former Worker Medical Screening Program Implementation | Department of  

Broader source: Energy.gov (indexed) [DOE]

Former Former Worker Medical Screening Program Implementation Former Worker Medical Screening Program Implementation Program implementation focuses on four specific activities, which are: Outreach: Identify and notify eligible DOE workers about FWP medical screening services. Medical Screening: Provide medical screening exams that are designed to check for health conditions related to occupational exposures to former workers who choose to participate in the program, including a re-screen exam every three years. Communicating Results: Provide exam results to participants, as well as information regarding any conditions that may require follow-up medical care with their personal physicians or specialists, and provide information regarding possible compensation for work-related illnesses. Follow-up care

304

Company Rehires Unemployed Workers for Energy Efficient Window Project |  

Broader source: Energy.gov (indexed) [DOE]

Company Rehires Unemployed Workers for Energy Efficient Window Company Rehires Unemployed Workers for Energy Efficient Window Project Company Rehires Unemployed Workers for Energy Efficient Window Project August 20, 2010 - 12:57pm Addthis Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Recovery Act grant funded $478,000 project for Kitsap County. Courthouse to save $25,000 per year with 95 new windows. Local vendor Pacific Glass rehires five workers. "Our labor force has fluctuated up and down this year due to the economy," said Pacific Glass President Bernie Thueringer. Thueringer and domestic frame and glass suppliers Efco Corp and Old Castle Glass have seen new business from a Recovery Act funded energy efficiency project in Kitsap County, Washington. "We were excited about this project because we were able to bring five of

305

Department of Energy Cites URS -Washington Division for Worker Safety  

Broader source: Energy.gov (indexed) [DOE]

URS -Washington Division for Worker URS -Washington Division for Worker Safety Violations Department of Energy Cites URS -Washington Division for Worker Safety Violations October 4, 2011 - 9:53am Addthis WASHINGTON, D.C. - The U.S. Department of Energy (DOE) has issued a Preliminary Notice of Violation (PNOV) to URS -Washington Division (URS-WD) based on an investigation of an October 2010 incident at the DOE Idaho Site. The PNOV cites URS-WD with two violations of the Department's worker safety and health regulations associated with a hoisting incident that occurred when a telescopic hydraulic gantry system (THGS) tipped while lifting a 7,800 pound shield plug at the Sodium Bearing Waste Treatment Project (SBWTP). The Department has proposed a $150,000 civil penalty. The hoisting incident revealed multiple breakdowns in job execution and

306

Workers Complete Demolition of Hanford's Historic Plutonium Vaults |  

Broader source: Energy.gov (indexed) [DOE]

Workers Complete Demolition of Hanford's Historic Plutonium Workers Complete Demolition of Hanford's Historic Plutonium Vaults Workers Complete Demolition of Hanford's Historic Plutonium Vaults April 1, 2012 - 12:00pm Addthis RICHLAND, Wash. - The Richland Operations Office and contractor CH2M HILL Plateau Remediation Company this month completed demolition of a large plutonium vault complex, formerly one of the highest security facilities at the Hanford site. "This project was a joint safety success between our workers who spent months cleaning out the facilities, the demolition crews who tore the buildings down and the crews who helped remove the waste for disposal. It took teamwork and cooperation to remove the complex safely and efficiently," said Ty Blackford, CH2M HILL Vice President of Decommissioning, Waste, Fuels and Remediation Services.

307

2013 Former Worker Medical Screening Program Annual Report  

Broader source: Energy.gov [DOE]

2013 Former Worker Medical Screening Program (FWP) Annual Report highlighting the accomplishments of this program, which provides critical services to those who served and sacrificed through their work in the Department and its predecessor agencies.

308

OHA Worker Appeal Cases Archive File | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

archive file of our Worker Appeal decisions, Please download this file to your local computer and use the build in adobe search feature. Individual cases are listed in the...

309

DOE Cites Battelle Energy Alliance, LLC for Worker Safety and...  

Energy Savers [EERE]

a chemical fume hood where a worker was pouring finely-powdered red phosphorus from a plastic bag into a metal canister and the red phosphorus ignited. The chemist involved in...

310

Improving Community Health Worker Performance Through Automated SMS  

E-Print Network [OSTI]

and support, make CHW programs difficult to maintain. An increasing number of mHealth projects are providing health workers, public health, ICT4CHW 1. INTRODUCTION The growing field of mHealth [1] in low

Parikh, Tapan S.

311

CRAD, Worker Safety Training - July 10, 2009 | Department of...  

Broader source: Energy.gov (indexed) [DOE]

July 10, 2009 July 10,. 2009 Worker Safety Training Inspection Criteria, Approach, and Lines of Inquiry (HSS CRAD 64-50, Rev. 0) This Criteria Review and Approach Document (HSS...

312

Worker's Compensation for Supervisors Briefing | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Worker's Compensation for Supervisors Briefing Worker's Compensation for Supervisors Briefing Worker's Compensation for Supervisors Briefing September 25, 2013 9:00AM to 1:00PM EDT Registration link: CHRIS (002497/0003) Course type: Classroom Course Location: DOE Forrestal Building, Room 8E-089 Course Description: The briefing will give first level supervisors/managers a broader range of information that will enable Department of Energy supervisors to follow proper procedures and control compensation costs. The briefing will provide information on the topics related to the supervisor's responsibility when employees file a claim, the types of claims, medical and monetary compensation involved in covering the injured worker. The training will also cover the Power Initiative to get employees back to work and the agency's responsibility in reducing lost

313

Evaluation of a digital communication device for railroad worker safety  

E-Print Network [OSTI]

This thesis documents the testing of a prototype of a smartphone to be used by roadway workers and dispatchers that was based in a wireless data link service. The main purpose of using a smartphone in railroad communications ...

Doran, Neslihan Iclal, 1977-

2005-01-01T23:59:59.000Z

314

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Honduras from SUNY Honduras from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

315

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Brazil from NREL Brazil from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

316

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Nicaragua from SUNY Nicaragua from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

317

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Central America from NREL Central America from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

318

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Guatemala from SUNY Guatemala from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

319

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Cuba sites from SUNY Cuba sites from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

320

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Ghana from NREL Ghana from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Sri Lanka from NREL Sri Lanka from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

322

A stochastic technique for synthesis of hourly precipitation  

E-Print Network [OSTI]

STATES DURING SIX PFRIODS WHEN THE LAST PERIOD IS DRY t-5 t-4 State t-3 During T 11M t-2 t-1 D D D D W W W W D D W W D D W W D W D W D W D W D W D W D W D W 19 fearures and of the daily precipitation record of the... 124 10 80 TABLE 5 FREQUENCIES OF 2-HR SEQUENCES State During Hour (t) 1 2 3 4 5 6 7 8 9 10 136, 330 338 311 198 171 138 65 38 52 30 2 3 416 220 142 68 30 380 170 189 102 50 21 7 6 42 8 7 4 3 9 2 4 0 5 Zl 7 4J 9 209 146 112 29...

Huddle, John Paul

2012-06-07T23:59:59.000Z

323

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

El Salvador sites from SUNY El Salvador sites from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

324

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Ethiopia from NREL Ethiopia from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

325

Activity-level Work Planning and Control in the Hanford Site Worker Evaluation Tool  

Broader source: Energy.gov [DOE]

Slide Presentation by Ted Giltz, Volpentest HAMMER Federal Training Center. Hanford Site Worker Eligibility Tool, Verifying Activity-Level Worker Medical Clearance and Training. The Hanford Site Worker Eligibility Tool (HSWET) provides line management an easy to use tool to determine if workers are medically cleared and trained to perform work safely.

326

Chemico-Biological Interactions 166 (2007) 301316 Mortality patterns among industrial workers exposed to  

E-Print Network [OSTI]

of industrial workers exposed to chloroprene (CD) and other substances, including vinyl chloride monomer (VC

Illinois at Chicago, University of

327

Office of Worker Screening and Compensation Support Workers' Spotlight, November/December 2013  

Broader source: Energy.gov (indexed) [DOE]

Al Tseu, former US Paratrooper, speaks with visitors Al Tseu, former US Paratrooper, speaks with visitors to the National Atomic Testing Museum celebrating the National Day of Remembrance I I I s s s s s s u u u e e e 1 1 1 0 0 0 N N N o o o v v v e e e m m m b b b e e e r r r / / / D D D e e e c c c e e e m m m b b b e e e r r r 2 2 2 0 0 0 1 1 1 3 3 3 Office of Worker Screening and Compensation Support I N S I D E T H I S I S S U E : Director's Note 1 Remembrance 1 Staff 2 Beryllium 2 Trivia 2 SERT 3 FWP Milestone 4 Calendar 5 A NOTE FROM THE DIRECTOR By Greg Lewis I had the pleasure of attending and presenting at the recent Joint Outreach Task Group (JOTG) meetings in Livermore and Berkeley, California. Representatives from the Department of Labor (DOL), the National Institute for Occupational Safety and Health, the DOL Ombudsman, and the Worker Health Protection

328

Retrieval of hourly records of surface hydrometeorological variables using satellite remote sensing data  

Science Journals Connector (OSTI)

A new algorithm is formulated for retrieving hourly time-series of surface hydrometeorological variables including net radiation, sensible heat flux, and near-surface air temperature aided by hourly visible images from the Geostationary ...

Sanaz Moghim; Andrew Jay Bowen; Sepideh Sarachi; Jingfeng Wang

329

EPA ENERGY STAR Webcast: Portfolio Manager Office Hours, Focus Topic: Sharing Forward and Transfer Ownership  

Broader source: Energy.gov [DOE]

Portfolio Manager "Office Hours" is a live webinar that gives all users an opportunity to ask their questions directly to EPA in an open forum. In 2014, Office Hours will be held once a month. We...

330

TESTING FORM Please deliver exams with envelope & testing form at least 24 hours in advance to  

E-Print Network [OSTI]

TESTING FORM Please deliver exams with envelope & testing form at least 24 hours in advance to: _________________________________ Class Time: __________ - __________ _________ Test Date: _______________________________ Time allotted): ____________________________ INSTRUCTOR PROCEDURES: 1. Please deliver tests to WYLY TOWER 318 at least 24 hours PRIOR to test time

Selmic, Sandra

331

Insights from Smart Meters: The Potential for Peak-Hour Savings from Behavior-Based Programs  

E-Print Network [OSTI]

top graph) as a percent of the total average energy usage ofgraph) as a percentage of each hours average energy usagegraph: first, kWh savings; second, normalized savings as a percent of the total average energy usage

Todd, Annika

2014-01-01T23:59:59.000Z

332

EPA ENERGY STAR Webcast- Portfolio Manager Office Hours, Focus Topic: Weather Data and Metrics  

Broader source: Energy.gov [DOE]

Portfolio Manager "Office Hours" is a live webinar that gives all users an opportunity to ask their questions directly to EPA in an open forum. In 2014, Office Hours will be held once a month. We...

333

Fuel Cell Stacks Still Going Strong After 5,000 Hours | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Stacks Still Going Strong After 5,000 Hours Fuel Cell Stacks Still Going Strong After 5,000 Hours March 24, 2009 - 1:00pm Addthis Washington, DC -- Two fuel cell stacks...

334

Magnetic field exposure among utility workers  

SciTech Connect (OSTI)

The Electric and Magnetic Field Measurement Project for Utilities -- the Electric Power Research Institute (EPRI) Electric and Magnetic Field Digital Exposure (EMDEX) Project (the EPRI EMDEX Project) -- was a multifaceted project that entailed technology transfer, measurement protocol design, data management, and exposure assessment analyses. This paper addresses one specific objective of the project: the collection, analysis, and documentation of power-frequency magnetic filed exposures for a diverse population of utility employees at 59 sites in four countries between September, 1988, and September, 1989. Specially designed sampling procedures and data collection protocols were used to ensure uniform implementation across sites. Volunteers within 13 job classifications recorded which of eight work or three nonwork environments they occupied while wearing an EMDEX meter. Approximately 50,000 hours of magnetic field exposure records taken at 10 s intervals were obtained, about 70% of which were from work environments. Exposures and time spent in environments were analyzed by primary work environment, by occupied environment, and by job classification.

Bracken, T.D.; Senior, R.S. [T. Dan Bracken, Inc., Portland, OR (United States); Rankin, R.F. [Applied Research Services, Inc., Lake Oswego, OR (United States); Alldredge, J.R. [Washington State Univ., Pullman, WA (United States); Sussman, S.S. [Electric Power Research Institute, Palo Alto, CA (United States)

1995-09-01T23:59:59.000Z

335

Minor in Psychology The minor in Psychology requires 18 hours of Psychology coursework as shown below. At least 6 hours of the  

E-Print Network [OSTI]

Minor in Psychology The minor in Psychology requires 18 hours of Psychology coursework as shown on this minor check sheet may be counted toward the Psychology minor. Research Methods/Critical Thinking Skills 1 PSYC Course - 3 hours Term Grade Hrs Qpts General Psychology Lecture (PSYC 1101) with a C

Raja, Anita

336

Worker Safety and Health Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Worker Safety and Health Enforcement Worker Safety and Health Enforcement Documents Worker Safety and Health Enforcement Documents Documents Available for Download November 27, 2013 Enforcement Letter, WEL-2013-04 Issued to National Renewable Energy Laboratory related to a drum rupture and flash event of the Thermochemical User Facility. August 29, 2013 Preliminary Notice of Violation, Brookhaven Science Associates, LLC - WEA-2013-01 issued to Brookhaven Science Associates, LLC, related to a Fall Injury Event that occurred in Building 701 at the Brookhaven National Laboratory WEA-2013-01 July 30, 2013 Enforcement Letter, WEL-2013-02 Issued to Wastren Advantage, Inc. related to the Loss of Supplied Breathing Air in the Box Breakdown Area of the Transuranic Waste Processing Center located in Oak Ridge, Tennessee

337

Worker Safety and Health Regulatory Assistance Reviews | Department of  

Broader source: Energy.gov (indexed) [DOE]

Worker Safety Worker Safety and Health Regulatory Assistance Reviews Worker Safety and Health Regulatory Assistance Reviews Documents Available for Download July 17, 2001 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-2001-04 Preliminary Notice of Violation issued to Kaiser-Hill Company, LLC, related to Nuclear Safety, Work Control, and Radiation Protection Deficiencies at the Rocky Flats Environmental Technology Site March 19, 2000 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-2000-05 Preliminary Notice of Violation issued to Kaiser-Hill Company, LLC, related to an Unplanned, Radioactive Material Uptake at the Rocky Flats Environmental Technology Site, (EA-2000-05) September 21, 1998 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA

338

Union Helps Produce Women Workers | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Union Helps Produce Women Workers Union Helps Produce Women Workers Union Helps Produce Women Workers January 21, 2010 - 3:15pm Addthis Joshua DeLung At the Community Environmental Center in Long Island City, N.Y. - and across the country - you don't always see a lot of women in the construction business. Locating experienced female weatherization technicians to recruit had proven difficult for CEC, but 30-year-old Tahlia Williams is the beginning of a new era in the clean energy economy. "Construction is something I had wanted to do for a long time," Tahlia says. "I had no way of knowing how to get into this field because I always heard it was a man's world. I wanted in." When the Recovery Act passed, providing more funding than ever to weatherize an unprecedented number of homes, CEC needed to train and hire

339

Radiological Worker Training - Radiological Contamination Control for Laboratory Research  

Broader source: Energy.gov (indexed) [DOE]

B B December 2008 DOE HANDBOOK RADIOLOGICAL WORKER TRAINING RADIOLOGICAL CONTAMINATION CONTROL TRAINING FOR LABORATORY RESEARCH U.S. Department of Energy FSC 6910 Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE Radiological Worker Training Appendix B Radiological Contamination Control for Laboratory Research DOE-HDBK-1130-2008 ii This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ . Radiological Worker Training Appendix B Radiological Contamination Control for Laboratory Research DOE-HDBK-1130-2008 iii Foreword This Handbook describes a recommended implementation process for core training as outlined in

340

Microsoft Word - Worker Safety and Health Reporting Criteria.docx  

Broader source: Energy.gov (indexed) [DOE]

Worker Safety and Health Noncompliance Reporting Criteria (as of January 1, 2012) Worker Safety and Health Noncompliance Reporting Criteria (as of January 1, 2012) Worker Safety and Health Noncompliances Associated With Occurrences (DOE Order 232.2) Consult the DOE Order for the full text of each occurrence criterion 1 Reporting Criteria Group Subgroup Occurrence Category and Summary Description 2 1. Operational Emergencies 3 N/A (1) Operational Emergency (2) Alert (3) Site Area Emergency (4) General Emergency 2. Personnel Safety and Health A. Occupational Injuries (1) Fatality/terminal injury (2) Inpatient hospitalization of > 3 personnel (3) Inpatient hospitalization > 5 days (4) > 3 personnel having Days Away, Restricted, or Transferred (DART) cases (5) Serious occupational injury B. Occupational Exposure (1) Fatality/terminal illness or inpatient

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Training Program Graduates Weatherization-Ready Workers | Department of  

Broader source: Energy.gov (indexed) [DOE]

Training Program Graduates Weatherization-Ready Workers Training Program Graduates Weatherization-Ready Workers Training Program Graduates Weatherization-Ready Workers April 29, 2010 - 5:45pm Addthis Daniel Tello demonstrates how to prepare an attic space for insulation using skills learned from the First Choice Program. | Photo courtesy of HCDC, Human Capital Development Corp., Inc. and Scott Anderson Daniel Tello demonstrates how to prepare an attic space for insulation using skills learned from the First Choice Program. | Photo courtesy of HCDC, Human Capital Development Corp., Inc. and Scott Anderson Lindsay Gsell On graduation day, students at Human Capital Development Corp., Inc. (HCDC) leave with more than just a diploma. They receive a hard hat, tool belt, hammer, utility knife and a tape measure. Graduates from Racine, Wis.-based HCDC First Choice Program are literally

342

Pennsylvania College Trains Weatherization Workers | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Pennsylvania College Trains Weatherization Workers Pennsylvania College Trains Weatherization Workers Pennsylvania College Trains Weatherization Workers March 8, 2010 - 10:55am Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy In Northeastern Pennsylvania, an area hard hit by recession, good jobs and careers can be hard to come by. "Lots of people have been out of work for months. It's a manufacturing area and there were a lot of layoffs in the past year," notes Liz Brobst, program coordinator for Johnson College, a private two-year technical college founded in 1912. The unemployment rate in the Scranton/Wilkes-Barre area rose to 9.7 percent in December, and closed out 2009 near a 17-year high. But opportunities for new careers are emerging through the Department of

343

Former Auto Worker Gauges Efficiency of American Homes | Department of  

Broader source: Energy.gov (indexed) [DOE]

Former Auto Worker Gauges Efficiency of American Homes Former Auto Worker Gauges Efficiency of American Homes Former Auto Worker Gauges Efficiency of American Homes December 2, 2009 - 5:20pm Addthis Joshua DeLung Doing good deeds for others is what Pete Boogaart in Holland, Mich., is all about. Pete, who's a married empty-nester with four kids, lost his job in January after keeping Americans safe and comfortable by testing car parts for the last 15 years. But through volunteering for a local action agency, he retooled his old skills and scored a new job as a weatherization inspector. His experience using gauges and other testing equipment made him a shoo-in. When he was in the car industry, he used gauges to test everything, down to the latch that holds the center console closed. "There are certain mandatory tests in weatherization that you have to do

344

Former Auto Worker Gauges Efficiency of American Homes | Department of  

Broader source: Energy.gov (indexed) [DOE]

Former Auto Worker Gauges Efficiency of American Homes Former Auto Worker Gauges Efficiency of American Homes Former Auto Worker Gauges Efficiency of American Homes December 2, 2009 - 5:20pm Addthis Joshua DeLung Doing good deeds for others is what Pete Boogaart in Holland, Mich., is all about. Pete, who's a married empty-nester with four kids, lost his job in January after keeping Americans safe and comfortable by testing car parts for the last 15 years. But through volunteering for a local action agency, he retooled his old skills and scored a new job as a weatherization inspector. His experience using gauges and other testing equipment made him a shoo-in. When he was in the car industry, he used gauges to test everything, down to the latch that holds the center console closed. "There are certain mandatory tests in weatherization that you have to do

345

Fostering a New Generation of Geothermal Workers | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Fostering a New Generation of Geothermal Workers Fostering a New Generation of Geothermal Workers Fostering a New Generation of Geothermal Workers October 5, 2010 - 4:31pm Addthis Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs Editor's Note: The Registration Deadline has been extended to November 12th. If there's one thing that absolutely must be in place to build a robust clean energy economy, it's a robust and well-trained clean energy workforce. Think about it - we're doing something here that we've never really done before, at least not to this scale. It's one thing to install solar panels on top of large building complexes and in huge fields - but how about every home in America? And if we're really going to use electric vehicles to the scale that David Sandalow talked about yesterday,

346

Union Helps Produce Women Workers | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Union Helps Produce Women Workers Union Helps Produce Women Workers Union Helps Produce Women Workers January 21, 2010 - 3:15pm Addthis Joshua DeLung At the Community Environmental Center in Long Island City, N.Y. - and across the country - you don't always see a lot of women in the construction business. Locating experienced female weatherization technicians to recruit had proven difficult for CEC, but 30-year-old Tahlia Williams is the beginning of a new era in the clean energy economy. "Construction is something I had wanted to do for a long time," Tahlia says. "I had no way of knowing how to get into this field because I always heard it was a man's world. I wanted in." When the Recovery Act passed, providing more funding than ever to weatherize an unprecedented number of homes, CEC needed to train and hire

347

Microsoft Word - HanfordWorkersComp082409.doc  

Broader source: Energy.gov (indexed) [DOE]

memorandum DATE: August 27, 2009 REPLY TO ATTN OF: IG-40 SUBJECT: Letter Report on "Allegations of Improper Hanford Workers' Compensation Payments," (INS-L-09-07, S09IS017) TO: Manager, Office of River Protection Manager, Richland Operations Office This is to advise you of the results of an Office of Inspector General inspection concerning workers' compensation related allegations at the Hanford site. Specifically, it was alleged that the Hanford site's tank farm contractor, Washington River Protection Solutions (WRPS), was paying employees on workers' compensation over 100 percent of their net salaries and beyond the 180 day limit allowed under the site's labor agreement. It was also alleged that the Department of Energy's (DOE's) Office of River Protection (ORP), WRPS, and the

348

Recovery Act Workers Demolish Facility Tied to Project Pluto History  

Broader source: Energy.gov (indexed) [DOE]

LAS VEGAS - Workers recently razed a facility used in the LAS VEGAS - Workers recently razed a facility used in the historic Project Pluto, the latest American Recovery and Rein- vestment Act accomplishment helping clean up traces of past nuclear testing at the Nevada National Security Site (NNSS). Recovery Act workers safely hauled the last demolition waste from the Pluto Disassembly Facility to disposal facilities Jan. 11. The project is slated for completion this spring after work- ers finish installing a concrete cap over the below-ground level where the facility stood. "Without Recovery Act funding, the demolition of Pluto would not have been feasible for several more years," Federal Sub- Project Director Kevin Cabble said. In the late 1950s and early 1960s, the Pluto facility was used to develop the world's first

349

Microsoft Word - WIPP Monitoring Program Ensures Worker Safety1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Program Ensures Worker Safety Monitoring Program Ensures Worker Safety CARLSBAD, N.M., March 3, 2011 - Officials with the U.S. Department of Energy's (DOE's) Carlsbad Field Office (CBFO) are citing the recent accreditation of the Waste Isolation Pilot Plant (WIPP) Laboratory as a cause for reflection on the important role environmental monitoring has played during WIPP's 12-year history. In February, the WIPP Laboratory, which operates out of the Carlsbad Environmental Monitoring and Research Center (CEMRC), was accredited by the DOE's Laboratory Accreditation Program for the fourth consecutive time. The lab received accreditation for conducting in vitro radiobioassay analysis - meaning it analyzes levels of radioactivity in the biological waste of radiological workers who might have come into contact with radiological

350

Joint Outreach Task Group Former Workers Screening Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

Joint Joint Outreach Task Group Former Workers Screening Program Joint Outreach Task Group Former Workers Screening Program The Joint Outreach Task Group (JOTG) includes representatives from HSS, Department of Labor (DOL), the National Institute for Occupational Safety and Health (NIOSH), the Offices of the Ombudsman for DOL and NIOSH, and the DOE-funded FWP projects. The JOTG was established in 2009 under the premise that agencies/programs with common goals can work together by combining resources and coordinating outreach efforts. Each involved agency has a different mission, but the missions are complementary. By working together, the agencies are better able to serve the DOE workforce. The JOTG focuses on educating the former workers on the programs and resources available to them.

351

WIPP Monitoring Program Ensures Worker Safety | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Monitoring Program Ensures Worker Safety Monitoring Program Ensures Worker Safety WIPP Monitoring Program Ensures Worker Safety March 3, 2011 - 12:00pm Addthis Media Contact Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M. - Officials with the U.S. Department of Energy's (DOE's) Carlsbad Field Office (CBFO) are citing the recent accreditation of the Waste Isolation Pilot Plant (WIPP) Laboratory as a cause for reflection on the important role environmental monitoring has played during WIPP's 12-year history. In February, the WIPP Laboratory, which operates out of the Carlsbad Environmental Monitoring and Research Center (CEMRC), was accredited by the DOE's Laboratory Accreditation Program for the fourth consecutive time. The lab received accreditation for conducting in vitro radiobioassay

352

Unitizing worker expertise and maximizing the brain reward centers  

SciTech Connect (OSTI)

People are experts when it comes to the work they do; unfortunately their expertise is not utilized as frequently as it could be. More opportunities need to be provided that allow people to participate in the design of their work including: accident investigations, job planning, and process improvements. Many employers use some form of job hazard analysis process to identify and document hazards and controls, but the front line worker is rarely involved. This presentation will show the core principles supporting employee involvement, provide examples where workers had brilliant ideas but no one listened, and provide examples where workers were given the opportunity to use their expertise to improve occupational safety. According to Abraham Maslow's Hierarch of Needs model, one essential human need is to be innovative and solve problems. Advances in brain science have proven, through functional magnetic resonance imaging (fMRI) studies, the brain reward pathway is activated when people are recognized for their intellectual contributions. As people contribute their expertise to improve occupational safety more frequently they will feel a sense of gratification. In addition, safety professionals will have more time to spend on strategic planning of emerging occupational safety issues. One effect of the current global recession is that SH&E professionals are asked to do more with less. Therefore, to be successful it is essential that SH&E professionals incorporate worker expertise in job planning. This will be illustrated in the presentation through an example where a worker had the answer to a difficult decision on appropriate personal protective equipment for a job but no one asked the worker for his idea during the job planning phase. Fortunately the worker was eventually consulted and his recommendation for the appropriate personal protective equipment for the job was implemented before work began. The goal of this presentation is to expand the awareness and knowledge of SH&E professionals on the benefits and opportunities for leveraging brain science. This will include an overview of the components of the brain reward pathway and the biological mechanisms that make workers feel a sense of gratification when they contribute their ideas toward improving occupational safety. On-the-job examples where it is hypothesized that the brain reward pathway was activated in workers will be provided. Finally, the presentation will include a model illustrating the importance of empowering workers to participate in occupational safety programs. SH&E professionals can use this model to maintain a robust safety and health program with limited resources. The model will also help SH&E professionals prepare for challenges in the SH&E fields by showing them how to allocate more time for strategic planning of emerging issues. Many recent best selling business books such as Wikinomics, Crowdsourcing, and Sway, illustrate how the benefit of harnessing the collective knowledge of employees is a key to company success. Companies like Google and Pixar have mastered the ability to capture empFoyee knowledge in terms of technology. Why should occupational safety be any different? Workers know how to improve safety in their workplace. SH&E professionals can harness this collective safety knowledge just as top companies do with technology, and workers will feel grateful for contributing.

Martinez, Anthony Bert [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

353

WIPP Monitoring Program Ensures Worker Safety | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

WIPP Monitoring Program Ensures Worker Safety WIPP Monitoring Program Ensures Worker Safety WIPP Monitoring Program Ensures Worker Safety March 3, 2011 - 12:00pm Addthis Media Contact Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M. - Officials with the U.S. Department of Energy's (DOE's) Carlsbad Field Office (CBFO) are citing the recent accreditation of the Waste Isolation Pilot Plant (WIPP) Laboratory as a cause for reflection on the important role environmental monitoring has played during WIPP's 12-year history. In February, the WIPP Laboratory, which operates out of the Carlsbad Environmental Monitoring and Research Center (CEMRC), was accredited by the DOE's Laboratory Accreditation Program for the fourth consecutive time. The lab received accreditation for conducting in vitro radiobioassay

354

Idaho Waste Treatment Facility Improves Worker Safety and Efficiency, Saves  

Broader source: Energy.gov (indexed) [DOE]

Waste Treatment Facility Improves Worker Safety and Waste Treatment Facility Improves Worker Safety and Efficiency, Saves Taxpayer Dollars Idaho Waste Treatment Facility Improves Worker Safety and Efficiency, Saves Taxpayer Dollars August 27, 2013 - 12:00pm Addthis The box retrieval forklift carriage is used to lift a degraded box as retrieval personnel monitor progress. The box retrieval forklift carriage is used to lift a degraded box as retrieval personnel monitor progress. The new soft-sided overpack is placed for shipment for treatment and repackaging. The new soft-sided overpack is placed for shipment for treatment and repackaging. The box retrieval forklift carriage is used to lift a degraded box as retrieval personnel monitor progress. The new soft-sided overpack is placed for shipment for treatment and repackaging.

355

New Year, New Certification Opportunities for Home Energy Workers |  

Broader source: Energy.gov (indexed) [DOE]

New Year, New Certification Opportunities for Home Energy Workers New Year, New Certification Opportunities for Home Energy Workers New Year, New Certification Opportunities for Home Energy Workers January 2, 2014 - 10:23am Addthis Trainees practice techniques on miniature model homes at the New River Center for Energy Research & Training in Christiansburg, Virginia. The Energy Department has developed a new certification program for quality control inspectors, energy auditors, crew leaders, and retrofit installer technicians, as part of the Weatherization Assistance Program's Guidelines for Home Energy Professionals project. | Photo courtesy of Weatherization Assistance Program Technical Assistance Center Trainees practice techniques on miniature model homes at the New River Center for Energy Research & Training in Christiansburg, Virginia. The

356

Question of the Week: How Are You Observing Earth Hour? | Department of  

Broader source: Energy.gov (indexed) [DOE]

Are You Observing Earth Hour? Are You Observing Earth Hour? Question of the Week: How Are You Observing Earth Hour? March 26, 2009 - 12:16pm Addthis This Saturday, March 28th, people around the world will observe Earth Hour at 8:30 p.m. local time-whatever the local time zone happens to be-by switching off their lights for one hour. While many people are taking part by simply shutting off their lights and lighting some candles, some communities are hosting gatherings or events around Earth Hour. How are you observing Earth Hour? Each Thursday, you have the chance to share your thoughts on a topic related to energy efficiency or renewable energy for consumers. Please e-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov. Addthis Related Articles Question of the Week: How Will You Save Energy this Spring?

357

Worker Safety and Health Enforcement Letter issued to Los Alamos National Security, LLC, related to Worker Beryllium Exposure during Machining at the Los Alamos National Laboratorys Beryllium Technology Facility, May 29, 2013 (WEL-2013-01)  

Broader source: Energy.gov (indexed) [DOE]

29, 2013 29, 2013 Dr. Charles F. McMillan, President Los Alamos National Security, LLC Los Alamos National Laboratory Mailstop A 100, Drop Point 03140071S Bikini Atoll Road, TA-3 Los Alamos, New Mexico 87454 WEL-2013-01 Dear Dr. McMillan: The Office of Health, Safety and Security's Office of Enforcement and Oversight evaluated the circumstances surrounding a work evolution performed at Los Alamos National Laboratory (LANL) Technical Area 3, Building 141, Beryllium Technology Facility (BTF), on July 11, 2012. The work evolution resulted in a worker exposure to beryllium in excess of the Department of Energy (DOE) action level of 0.2 micrograms per cubic meter for an 8-hour, time-weighted average. Los Alamos National Security, LLC (LANS), which manages and

358

2013 Former Worker Medical Screening Program Annual Report  

Broader source: Energy.gov [DOE]

The 2013 Annual Report presents a detailed overview of the accomplishments, progress, and future endeavors of the U.S. Department of Energy Former Worker Medical Screening Program. The report describes how the program is implemented, what organizations are involved in the medical screening efforts, and what the medical findings have been to date.

359

Worker reproduction and policing in insect societies: an ESS analysis  

E-Print Network [OSTI]

Worker reproduction and policing in insect societies: an ESS analysis T. WENSELEERS,* H. HELANTERA strategy (ESS) model to investigate factors that could explain these observed low levels of reproductive exploitation. Two key factors are identified: relatedness and policing. Relatedness affects the ESS proportion

Wenseleers, Tom

360

Workers Enter Cocooned F Reactor for Scheduled Inspection  

Broader source: Energy.gov [DOE]

RICHLAND, Wash. Workers from Mission Support Alliance, LLC., removed the welds around the steel door of the F Reactor last week before stepping inside the reactor to complete its periodic inspection. This is the first time the Department of Energy (DOE) has had the reactor open since 2008.

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Patterns of coal workers' pneumoconiosis in Appalachian former coal miners  

SciTech Connect (OSTI)

To aid in diagnostic chest film interpretation of coal workers' pneumoconiosis, a composite profile of common radiologic patterns was developed in 98 Appalachian former coal miners who were diagnosed as having coal miner's pneumoconiosis and who applied for black lung benefits. The mean age was 61 years, with a lifetime coal mine dust exposure of 18.7 years. Results showed that chest radiographs of coal workers' simple pneumoconiosis contained small irregular linear opacities more frequently (47%) than small rounded opacities. Sparse profusion of all small opacities was the rule. Small opacities involved two out of six lung zones simultaneously 39% of the time while other combinations occurred less frequently. Lower zones were involved more frequently than upper ones. Thickened pleura occurred in 18% of radiographs. Other frequent radiographic abnormalities were parenchymal calcifications (19%), marked emphysema (12%), and inactive tuberculosis (12%). Calcification of the aortic knob, a degenerative process reflecting age, occurred in 9%. Only one instance of complicated coal workers' pneumoconiosis (progressive massive fibrosis) was encountered (0.7%). Many of the descriptive features of coal workers' pneumoconiosis noted in the literature were not observed in this study. Only one instance of complicated pneumoconiosis was encountered.43 references.

Young, R.C. Jr.; Rachal, R.E.; Carr, P.G.; Press, H.C. (College of Pharmacy, Xavier University of Louisiana, New Orleans (United States))

1992-01-01T23:59:59.000Z

362

OCCUPATIONAL RADIATION PROTECTION OF HEALTH WORKERS IN IMAGING  

Science Journals Connector (OSTI)

......workers (e.g. cardiologists for lens and brain occupational doses)(9, 10). The increasing...increased cancer risks. Documented cases of brain and neck tumours involved 31 physicians...for circulatory disease of the heart or brain. Exposure of staff (lens of the eye......

E. Vano

2014-12-01T23:59:59.000Z

363

Oak Ridge K-25 Gaseous Diffusion Plant, Former Production Workers Screening  

Broader source: Energy.gov (indexed) [DOE]

K-25 Gaseous Diffusion Plant, Former Production Workers K-25 Gaseous Diffusion Plant, Former Production Workers Screening Projects Oak Ridge K-25 Gaseous Diffusion Plant, Former Production Workers Screening Projects Project Name: Worker Health Protection Program Covered DOE Site: K-25 Worker Population Served: Production Workers Principal Investigator: Jim Frederick Co-Principal Investigator: Steven Markowitz, MD Toll-free Telephone: (888) 241-1199 Local Outreach Office: Bruce Lawson 133 Raleigh Road Oak Ridge, TN 37830 Local Medical Clinics: ParkMed 110 S. Illinois Avenue Oak Ridge, TN 37380 Website: http://www.worker-health.org/ This project is conducted by the United Steelworkers in conjunction with Queens College of the City University of New York. The program is being offered as a service to both former and current workers. Free of charge,

364

Yearly Chnages of Radiation Exposure Doses Received by Workers in Radiological Occupations at Kyushu University Hospital  

Science Journals Connector (OSTI)

......by Workers in Radiological Occupations at Kyushu University Hospital Hideo Irie * Chikara Takei * Shigeki Momii * Takehiko Higuchi...by workers in radiological occupations at Kyushu University Hospital from September 1962 to March 1966 were reported. The exposure......

Hideo Irie; Chikara Takei; Shigeki Momii; Takehiko Higuchi; Sigeaki Okamura; Kouji Masuda

1967-09-01T23:59:59.000Z

365

Worker Safety and Health Program (10 CFR 851/DOE 0440.1B) | Department...  

Office of Environmental Management (EM)

Worker Safety and Health Program (10 CFR 851DOE 0440.1B) Worker Safety and Health Program (10 CFR 851DOE 0440.1B) The DOE Safety and Health Program supports line management and...

366

10 CFR part 851, Worker Safety and Health Program, Fact Sheet...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

10 CFR part 851, Worker Safety and Health Program, Fact Sheet 10 CFR part 851, Worker Safety and Health Program, Fact Sheet July 1, 2013 The following questions regarding 10 CFR...

367

Department of Energy Cites Fluor-B&W Portsmouth, LLC for Worker...  

Office of Environmental Management (EM)

Fluor-B&W Portsmouth, LLC for Worker Safety and Health Violations Department of Energy Cites Fluor-B&W Portsmouth, LLC for Worker Safety and Health Violations July 8, 2014 - 2:30pm...

368

Sun Sentinel Florida has lowest rate of workers saving in an employer  

E-Print Network [OSTI]

Sun Sentinel Florida has lowest rate of workers saving in an employer retirement plan January 08, 2012|By Donna Gehrke-White, Sun Sentinel Florida is at the bottom when it comes to workers

Belogay, Eugene A.

369

Assessment of plutonium exposures for an epidemiological study of US nuclear workers  

Science Journals Connector (OSTI)

......Institute for Occupational Safety and Health (NIOSH) 5555...Institute for Occupational Safety and Health (NIOSH) is...plutonium workers at the Rocky Flats Plant, Wilkinson et al...plutonium workers at the Rocky Flats Plant: a case-control......

R. D. Daniels; C. J. Lodwick; M. K. Schubauer-Berigan; H. B. Spitz

2006-04-01T23:59:59.000Z

370

Health effects of low-level radiation in shipyard workers. Final report: [Draft  

SciTech Connect (OSTI)

The Nuclear Shipyard Workers Study (NSWS) was designed to determine whether there is an excess risk of leukemia or other cancers associated with exposure to low levels of gamma radiation. The study compares the mortality experience of shipyard workers who qualified to work in radiation areas to the mortality of similar workers who hold the same types of jobs but who are not authorized to work in radiation areas. The population consists of workers from six government and two private shipyards.

Matanoski, G.M.

1991-06-01T23:59:59.000Z

371

Earth Hour 2009: March 28, 8:30-9:30 PM Local Time | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Earth Hour 2009: March 28, 8:30-9:30 PM Local Time Earth Hour 2009: March 28, 8:30-9:30 PM Local Time Earth Hour 2009: March 28, 8:30-9:30 PM Local Time March 27, 2009 - 6:00am Addthis John Lippert The city of Greenbelt, Maryland, where I live, is living up to its "green" name by participating in Earth Hour. This global event asks everyone to "go dark" for an hour to make a powerful statement of concern about climate change. The city will be turning off all non-essential lights in municipal buildings. Residents are requested to turn off their lights (and other energy-consuming appliances). The Greenbelt Advisory Committee on Environmental Sustainability, which advises the mayor and city council and which I chair, will be sponsoring a flashlight walk around Old Greenbelt during Earth Hour. My wife and I will

372

Earth Hour 2009: March 28, 8:30-9:30 PM Local Time | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Earth Hour 2009: March 28, 8:30-9:30 PM Local Time Earth Hour 2009: March 28, 8:30-9:30 PM Local Time Earth Hour 2009: March 28, 8:30-9:30 PM Local Time March 27, 2009 - 6:00am Addthis John Lippert The city of Greenbelt, Maryland, where I live, is living up to its "green" name by participating in Earth Hour. This global event asks everyone to "go dark" for an hour to make a powerful statement of concern about climate change. The city will be turning off all non-essential lights in municipal buildings. Residents are requested to turn off their lights (and other energy-consuming appliances). The Greenbelt Advisory Committee on Environmental Sustainability, which advises the mayor and city council and which I chair, will be sponsoring a flashlight walk around Old Greenbelt during Earth Hour. My wife and I will

373

Pyrethroids in house dust from the homes of farm worker families in the MICASA study  

E-Print Network [OSTI]

Pyrethroids in house dust from the homes of farm worker families in the MICASA study Kelly J high in homes of immigrant farm worker families, who often live in close proximity to agricultural and pesticide use. We investigate levels of pyrethroids in the house dust of farm worker family homes in a study

Hammock, Bruce D.

374

Enriching the distressing reality: social media use by chinese migrant workers  

Science Journals Connector (OSTI)

Based on a field study in Guangdong Province, this paper describes the social media use of Chinese migrant workers in the manufacturing sector. It was found that social media plays a significant role in the lives of young workers who have left their ... Keywords: china, field study, migrant worker, social media, virtual identity

Jingjing Liu; Alexander Boden; David William Randall; Volker Wulf

2014-02-01T23:59:59.000Z

375

Assessment of plutonium exposures for an epidemiological study of US nuclear workers  

Science Journals Connector (OSTI)

......In a study of mortality among plutonium workers at the Rocky Flats Plant, Wilkinson et al.(2) separated workers into...and internal lung doses among plutonium workers at the Rocky Flats Plant: a case-control study. Am. J. Epidemiol......

R. D. Daniels; C. J. Lodwick; M. K. Schubauer-Berigan; H. B. Spitz

2006-04-01T23:59:59.000Z

376

Recreation Pool Hours and Availability for Rochester INDIVIDUAL GUEST FEES WILL APPLY AT FACILITIES LISTED  

E-Print Network [OSTI]

Recreation Pool Hours and Availability for Rochester INDIVIDUAL GUEST FEES WILL APPLYSp_aquatic.pdf Perinton http://www.perinton.org/Departments/Recreation/PCC Pittsford Pages 1012 http

Portman, Douglas

377

Intra-hour wind power variability assessment using the conditional range metric : quantification, forecasting and applications.  

E-Print Network [OSTI]

??The research presented herein concentrates on the quantification, assessment and forecasting of intra-hour wind power variability. Wind power is intrinsically variable and, due to the (more)

Boutsika, Thekla

2013-01-01T23:59:59.000Z

378

E-Print Network 3.0 - after-hours care instructions Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

after hours access? yes no AUP Number... Supervisor's Signature Submitted Occupational Health Form to Animal Care and Use 608 Boyd Graduate Studied... Building ... Source:...

379

September 16, 2008; HSS/Union Working Group Meeting, Former Worker and Energy Compensation Programs, CAIRS Reporting, Central Worker Data Tracking - Information Package  

Broader source: Energy.gov (indexed) [DOE]

DOE Former Worker/Energy Compensation DOE Former Worker/Energy Compensation CAIRS Central Worker Data Tracking September 16, 2008 September 16, 2008 CAIRS Central Worker Data Tracking September 16, 2008 n The information contained in this package is intended to be reference materials pertaining to the September 16, 2008 HSS/Union working group meeting. The informational pieces have been retrieved from the Internet or submitted by HSS and Union representatives for inclusion in the package, and does not necessarily reflect the view, support, or endorsement of all of the participating organizations. Agenda 08-19-08 Draft HSS/Union Working Group Meeting September 16, 2008 1:00 - 3:00 pm EST FORS 7E-069 SUBJECT: Former Worker/Energy Compensation Programs CAIRS Reporting Central Worker Data Tracking

380

Integrating The Non-Electrical Worker Into The Electrical Safety Program  

SciTech Connect (OSTI)

The intent of this paper is to demonstrate an electrical safety program that incorporates all workers into the program, not just the electrical workers. It is largely in response to a paper presented at the 2012 ESW by Lanny Floyd entitled "Facilitating Application of Electrical Safety Best Practices to "Other" Workers" which requested all attendees to review their electrical safety program to assure that non-electrical workers were protected as well as electrical workers. The referenced paper indicated that roughly 50% of electrical incidents involve workers whose primary function is not electrical in nature. It also encouraged all to "address electrical safety for all workers and not just workers whose job responsibilities involve working on or near energized electrical circuits." In this paper, a program which includes specific briefings to non-electrical workers as well as to workers who may need to perform their normal activities in proximity to energized electrical conductors is presented. The program uses a targeted approach to specific areas such as welding, excavating, rigging, chart reading, switching, cord and plug equipment and several other general areas to point out hazards that may exist and how to avoid them. NFPA 70E-2004 was incorporated into the program several years ago and with it the need to include the "other" workers became apparent. The site experience over the years supports the assertion that about half of the electrical incidents involve non-electrical workers and this prompted us to develop specific briefings to enhance the knowledge of the non-electrical worker regarding safe electrical practices. The promotion of "May is Electrical Safety Month" and the development of informative presentations which are delivered to the general site population as well as electrical workers have greatly improved the hazards awareness status of the general worker on site.

Mills, T. David; McAlhaney, John H.

2012-08-17T23:59:59.000Z

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Algorithmic MechanismsAlgorithmic Mechanisms forforAlgorithmic MechanismsAlgorithmic Mechanisms forfor Reliable MasterReliable Master--Worker InternetWorker Internet--basedbased  

E-Print Network [OSTI]

-Worker computing: @home projects e.g., SETI@home, AIDS@home, Folding@home, PrimeNet 66 SETISETI Search for Extra

Georgiou, Chryssis

382

Construction Workers Achieve Safety Milestone at Savannah River Site  

Broader source: Energy.gov [DOE]

AIKEN, S.C. A portion of the construction workforce at the Savannah River Site (SRS) has worked more than 26 million hours without injury or illness resulting in missed work days.

383

Sample 8 Semester Plan for NRES Students need 130 hours to graduate.  

E-Print Network [OSTI]

resource systems with emphasis on the ecology, biology, conservation, and management of fish and wildlifeSample 8 Semester Plan for NRES Students need 130 hours to graduate. Year 11 Fall Semester ACES 101 Public Speaking2 IB 103 Intro to Plant Biology Statistics3 or Cultural Studies4 Total Hours Hrs 3 1 3-4 4

Kent, Angela

384

Optimal Multi-scale Capacity Planning under Hourly Varying Electricity Prices  

E-Print Network [OSTI]

1 Optimal Multi-scale Capacity Planning under Hourly Varying Electricity Prices Sumit Mitra Ignacio;2 Motivation of this work · Deregulation of the electricity markets caused electricity prices to be highly? (retrofit) · Challenge: Multi-scale nature of the problem! Hourly varying electricity prices vs. 10-15 years

Grossmann, Ignacio E.

385

STUDENT HOURLY OFFICE ASSISTANT Position available with the History of Cartography Project  

E-Print Network [OSTI]

STUDENT HOURLY OFFICE ASSISTANT Position available with the History of Cartography Project Hours · Must be enrolled UW student; work study funding accepted · Experience with Word, Excel, database To apply, submit a detailed letter of application and resume to Beth Freundlich at: History of Cartography

Wisconsin at Madison, University of

386

Short Term Hourly Load Forecasting Using Abductive Networks R. E. Abdel-Aal  

E-Print Network [OSTI]

Short Term Hourly Load Forecasting Using Abductive Networks R. E. Abdel-Aal Center for Applied for this purpose. This paper proposes using the alternative technique of abductive networks, which offers with statistical and empirical models. Using hourly temperature and load data for five years, 24 dedicated models

Abdel-Aal, Radwan E.

387

Health Surveillance Outcomes in Former Rocky Flats Radiation Workers  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Surveillance of Rocky Flats Radiation Workers Surveillance of Rocky Flats Radiation Workers Janice P. Watkins 1 , Elizabeth D. Ellis 1 , F. Joseph Furman 2 , Roger B. Falk 2 , Joe M. Aldrich 2 , and Donna L. Cragle 1 ORAU Technical Report # 2006-0408 1 Oak Ridge Institute for Science and Education, Center for Epidemiologic Research; P.O. Box 117; Oak Ridge, TN 37831-0117 2 Oak Ridge Institute for Science and Education, Center for Epidemiologic Research; 9950 W. 80 th Avenue, Suite 17; Arvada, CO 80005-3914 This report was funded by Department of Energy Environmental Health Division under contract number DE-AC05-00OR22750. Table of Contents List of Figures.................................................................................................................2 List of Tables

388

Research helps safeguard nuclear workers worldwide - Argonne's Historical  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research helps safeguard nuclear workers Research helps safeguard nuclear workers worldwide About Director's Welcome Organization Achievements Highlights Fact Sheets, Brochures & Other Documents Multimedia Library Visit Argonne Work with Argonne Contact us Nuclear Energy Why Nuclear Energy? Why are some people afraid of Nuclear Energy? How do nuclear reactors work? Cheaper & Safer Nuclear Energy Helping to Solve the Nuclear Waste Problem Nuclear Reactors Nuclear Reactors Early Exploration Training Reactors Basic and Applied Science Research LWR Technology Development BORAX-III lighting Arco, Idaho (Press Release) Heavy Water and Graphite Reactors Fast Reactor Technology Integral Fast Reactor Argonne Reactor Tree CP-1 70th Anniversary CP-1 70th Anniversary Argonne's Nuclear Science and Technology Legacy Argonne's Nuclear Science and Technology Legacy

389

ORISE: Worker Health Studies - Testing Beryllium Vendor Populations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Oak Ridge Institute for Science Education Oak Ridge Institute for Science Education Beryllium Testing Vendor Populations When former employees at 25 closed U.S. Department of Energy (DOE) beryllium vendor companies needed an entity to provide medical screening and tests related to their beryllium exposure, the agency chose the Oak Ridge Institute for Science and Education (ORISE) to manage the program. ORISE administers a brief health questionnaire and a blood test known as the beryllium lymphocyte proliferation test (BeLPT) to determine if a worker has been sensitized to the light metal or if he or she needs to be evaluated further for chronic beryllium disease (CBD). If a worker has at least one abnormal BeLPT, he or she is referred for further evaluation through the Energy Employees Occupational Illness

390

Former Worker Program - Defunct Beryllium Vendor Screening Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Defunct Beryllium Vendor Screening Program Defunct Beryllium Vendor Screening Program Former Worker Medical Screening Program (FWP) In February 2005, DOE expanded the beryllium screening program to include former employees of defunct DOE beryllium vendors who were employed with these companies while they performed work for DOE. This change was made to ensure that workers who no longer have an employer to turn to for beryllium disease testing could receive this important screening. DOE will offer these individuals a blood test at no cost to check for beryllium sensitization. DOE will pay for both the costs of drawing the blood and the analysis of the blood. If a screened individual receives an abnormal test for beryllium sensitization, they can receive medical monitoring for beryllium disease through DOL's EEOICP.

391

Oak Ridge Y-12 and Oak Ridge National Laboratory, Former Production Workers  

Broader source: Energy.gov (indexed) [DOE]

Y-12 and Oak Ridge National Laboratory, Former Production Y-12 and Oak Ridge National Laboratory, Former Production Workers Screening Projects Oak Ridge Y-12 and Oak Ridge National Laboratory, Former Production Workers Screening Projects Project Name: Worker Health Protection Program Covered DOE Site: Y-12 and ORNL (X-10) Worker Population Served: Production Workers Principal Investigator: Steven Markowitz, MD Toll-free Telephone: (800) 906-2019 Local Outreach Office: Linda Parker 109 Viking Road Oak Ridge, TN 37830 Website: http://www.worker-health.org/ Former workers at risk from exposures while working at Y-12 and X-10 are offered a free medical screening. This project is carried out by investigators from the Queens College of the City University of New York. This program also offers CT scans for early lung cancer detection to

392

Tri-fold - Agencies Assisting with EEOICPA and the Former worker Program |  

Broader source: Energy.gov (indexed) [DOE]

Information Center » Worker » Former Worker Program » Tri-fold - Information Center » Worker » Former Worker Program » Tri-fold - Agencies Assisting with EEOICPA and the Former worker Program Tri-fold - Agencies Assisting with EEOICPA and the Former worker Program January 2014 Agencies Assisting with EEOICPA and the Former Worker Program FWP provides no-cost medical screenings to all former DOE Federal, contractor, and subcontractor employees. The screening focuses on the early detection of health conditions that may be related to occupational exposures such as beryllium, asbestos, radiation, silica, etc. Medical screenings include a physical exam, hearing test, Medical screenings include a physical exam, hearing test, blood and urine tests, and other special tests depending on the individual's work and exposure history.

393

Former Worker Program Reaches 100,000 Screening Milestone | Department of  

Broader source: Energy.gov (indexed) [DOE]

Former Worker Program Reaches 100,000 Screening Milestone Former Worker Program Reaches 100,000 Screening Milestone Former Worker Program Reaches 100,000 Screening Milestone August 29, 2013 - 8:51am Addthis Former Worker Program Reaches 100,000 Screening Milestone A major milestone was reached in June of this year - over 100,000 exams have now been provided to former workers since the inception of the program. Since 1996, the program has made great strides in addressing the occupational health legacy of the Department's 70-plus years of nuclear weapons design and production. We at the Office of Health, Safety and Security are especially proud of the emphasis we place on the importance of serving our workers. The Former Worker Medical Screening Program (FWP) is a prime example of DOE's commitment to its workforce and demonstrates the

394

10 C.F.R. Part 851, Worker Safety and Health Program - February 9, 2006 |  

Broader source: Energy.gov (indexed) [DOE]

0 C.F.R. Part 851, Worker Safety and Health Program - February 9, 0 C.F.R. Part 851, Worker Safety and Health Program - February 9, 2006 10 C.F.R. Part 851, Worker Safety and Health Program - February 9, 2006 February 9, 2006 10 C.F.R. Part 851 - Worker Safety and Health Program Final Rule. Pages 75-92 without preamble § 851.1 Scope and purpose. The worker safety and health requirements in this part govern the conduct of contractor activities at DOE sites. This part establishes the: Requirements for a worker safety and health program that reduces or prevents occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites; and Procedures for investigating whether a violation of a requirement of this part has occurred, for determining the nature and extent of any such

395

Patterns of role-impairment among alcoholic workers  

E-Print Network [OSTI]

behavior of alcoholic workers. Five dimensions of work behavior were examined with respect to possible modes of role impairment: work efficiency; absenteeism; cover-up practices; job turn-over; and. lost-time accident rates. The data were obtained from... in general No relationship between alcoholism and lost- time accidents was found. Three factors which may explain the low rate of accidents among problem drinkers were identified: (l) most respondents reported that there was little possibility of having...

Goldstein, Carolyn Lesley Klein

2012-06-07T23:59:59.000Z

396

Thyroid nodularity and cancer among Chernobyl cleanup workers from Estonia  

SciTech Connect (OSTI)

Thyroid examinations, including palpation, ultrasound and, selectively, fine-needle aspiration biopsy, were conducted on nearly 2,000 Chernobyl cleanup workers from Estonia to evaluate the occurrence of thyroid cancer and nodular thyroid disease among men with protracted exposure to ionizing radiation. The examinations were conducted in four cities in Estonia during March-April 1995, 9 years after the reactor accident. The study population was selected from a predefined cohort of 4,833 cleanup workers from Estonia under surveillance for cancer incidence. These men had been sent to Chernobyl between 1986 and 1991 to entomb the damaged reactor, remove radioactive debris and perform related cleanup activities. A total of 2,997 men were invited for thyroid screening and 1,984 (66%) were examined. Estimates of radiation dose from external sources were obtained from military or other institutional records, and details about service dates and types of work performed while at Chernobyl were obtained from a self-administered questionnaire. Blood samples were collected for assay of chromosomal translocations in circulating lymphocytes and loss of expression of the glycophorin A (GPA) gene in erythrocytes. The primary outcome measure was the presence or absence of thyroid nodules as determined by the ultrasound examination. Of the screened workers, 1,247 (63%) were sent to Chernobyl in 1986, including 603 (30%) sent in April or May, soon after the accident. Workers served at Chernobyl for an average of 3 months. The average age was 32 years at the time of arrival at Chernobyl and 40 years at the time of thyroid examination. The mean documented radiation dose from external sources was 10.8 cGy. Biological indicators of exposure showed low correlations with documented dose, but did not indicate that the mean dose for the population was higher than the average documented dose. 47 refs., 1 fig., 9 tabs.

Inskip, P.D.; Boice, J.D. Jr. [National Cancer Inst., Rockville, MD (United States); Tekkel, M. [Univ. of New Mexico, Albuquerque, NM (United States)] [and others

1997-02-01T23:59:59.000Z

397

Handbook: County Program Building for Texas Agricultural Extension Workers.  

E-Print Network [OSTI]

lkrc~ound bbmafbn Puklkiso b.Ammi)te88 and Tndlirfdods E~atluate and Project the County Program BASIC STEPS A TEXAS. AGRtCULTURAL EXTEPISION SERVICE [Blank Page in Original Bulletin] To A I1 &tension Workers: This handbook supplements... this handbook, we assume that each county has a program building committee of some kind. Because of the wide differences among vounties, no one organizational plan will fit all counties in detail. The handbook provides an organizational structure which can...

1955-01-01T23:59:59.000Z

398

Worker Health at a Glance, 2000-2009  

Broader source: Energy.gov [DOE]

Worker Health at a Glance, 2000 2009, provides an overview of several important illness and injury patterns among the current DOE contractor workforce that have emerged over the 10-years covered by this report. This report is a roll-up of data from 16 individual DOE sites, assigned to one of three program offices (Office of Environmental Management, Office of Science and the National Nuclear Security Administration).

399

Derivation of 24-Hour Average SO2, Background for the Update 1 Report |  

Broader source: Energy.gov (indexed) [DOE]

Derivation of 24-Hour Average SO2, Background for the Update 1 Derivation of 24-Hour Average SO2, Background for the Update 1 Report Derivation of 24-Hour Average SO2, Background for the Update 1 Report Docket No. EO-05-01. As supporting documentation for "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant: Modeling Unit 1 Emissions in a Cycling Mode" this memo documents the fact that the observed 24-hour SO2 background concentrations during periods when meteorological conditions produce the highest impacts from Unit 1. Derivation of 24-Hour Average SO2, Background for the Update 1 Report More Documents & Publications Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant"

400

Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Docket No. EO-05-01: Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor, March 2002 to November 2004, showing the model overprediction Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

University of Virginia Time Management Form Shift Hours Worked Code Payroll Elements Leave  

E-Print Network [OSTI]

). ___ Administrative Summons ___ Employee Assistance Program (EAP) ___ Career Services ___ Grievance Process A Annual Leave AC Agency Closing (Inclement Weather) C Comp Leave CS Comp Special Leave E Educational Leave the Departmental Timekeeper for assistance. Short Term Disability and Workers Comp Leave Types OSTD STD (ORP) VSTD

Acton, Scott

402

Alertness, performance and off-duty sleep on 8-hour and 12-hour night shifts in a simulated continuous operations control room setting  

SciTech Connect (OSTI)

A growing number of nuclear power plants in the United States have adopted routine 12-hr shift schedules. Because of the potential impact that extended work shifts could have on safe and efficient power plant operation, the U.S. Nuclear Regulatory Commission funded research on 8-hr and 12-hr shifts at the Human Alertness Research Center (HARC) in Boston, Massachusetts. This report describes the research undertaken: a study of simulated 8-hr and 12-hr work shifts that compares alertness, speed, and accuracy at responding to simulator alarms, and relative cognitive performance, self-rated mood and vigor, and sleep-wake patterns of 8-hr versus 12-hr shift workers.

Baker, T.L. [Institute for Circadian Physiology, Boston, MA (United States)

1995-04-01T23:59:59.000Z

403

Average Data for Each Choke Setting (before 24-May 2010 06:00), 6-hour average (  

Broader source: Energy.gov (indexed) [DOE]

Average Data for Each Choke Setting (before 24-May 2010 06:00), 6-hour average (after 24-May 2010 06:00):" Average Data for Each Choke Setting (before 24-May 2010 06:00), 6-hour average (after 24-May 2010 06:00):" ,,"Choke","Average","Average","Fluid","Methanol","Water","Oil","Gas","Hyd. Eq.","Gas" ,"Choke","Setting","Upstream","Upstream","Recovery","Recovery","Recovery","Recovery","Recovery","Recovery","Recovery" "Date and Time","Setting","Duration","Pressure","Temp.","Rate","Rate","Rate","Rate","Rate","Rate","Portion" "dd-mmm-yy","(64ths)","(hours)","(psia)","(degF)","(bfpd)","(bfpd)","(bwpd)","(bopd)","(mmcfpd)","(boepd)","(%)"

404

Calibration of Predicted Hourly Zone-Level Supply Air Flows with Measurements  

E-Print Network [OSTI]

the chemical composition, then sends a signal to the control system to increase the ventilation rate, if necessary. This system cannot be modeled in eQuest. The null hypothesis H0 is true only if the t-value is less than tcritical; if t-value is greater..., daily and monthly calibration analysis: CV-RMSE[%] vs. t-test CV-RMSE [%] Zone Interval Time step t t,cr 2.1 NE Summer Hourly 18.8 Daily 9.5 Monthly 4.2 3 days Hourly 24.2 2.4 SW Summer Hourly 28.4 Daily 12.7 Monthly 4...

Mihai, A.; Zmeureanu, R.

2013-01-01T23:59:59.000Z

405

DOE Awards 265 Million Hours of Supercomputing Time to Advance Leading  

Broader source: Energy.gov (indexed) [DOE]

265 Million Hours of Supercomputing Time to Advance 265 Million Hours of Supercomputing Time to Advance Leading Scientific Research Projects DOE Awards 265 Million Hours of Supercomputing Time to Advance Leading Scientific Research Projects January 17, 2008 - 10:38am Addthis WASHINGTON, DC -The U.S. Department of Energy's (DOE) Office of Science today announced that 265 million processor-hours were awarded to 55 scientific projects, the largest amount of supercomputing resource awards donated in the Department's history and three times that of last year's award. The projects-with applications from aeronautics to astrophysics, and from climate change to combustion research-were chosen based on their potential breakthroughs in the science and engineering research and their suitability of the project for using supercomputers. These awards will

406

Commercial and Residential Hourly Load Data Now Available on OpenEI! |  

Open Energy Info (EERE)

Commercial and Residential Hourly Load Data Now Available on OpenEI! Commercial and Residential Hourly Load Data Now Available on OpenEI! Home > Groups > Utility Rate Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL I am pleased to announce that simulated hourly residential and commercial building load datasets are now available on OpenEI. These datasets are available for all TMY3 locations in the United States. They contain hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). In addition to various

407

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

Ethiopia from DLR Ethiopia from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2001 and 2002 for selected sites in Ethiopia. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DLR DNI GHI hourly data solar SWERA TILT UNEP Data application/zip icon Download data (zip, 2.1 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage

408

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

Kenya from DLR Kenya from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2001 and 2002 for selected sites in Kenya. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DLR DNI GEF GHI hourly data Kenya solar SWERA TILT UNEP Data application/zip icon Download data (zip, 3.9 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage

409

DOE's Office of Science Awards 95 Million Hours of Supercomputing Time to  

Broader source: Energy.gov (indexed) [DOE]

95 Million Hours of Supercomputing 95 Million Hours of Supercomputing Time to Advance Research in Science, Academia and Industry DOE's Office of Science Awards 95 Million Hours of Supercomputing Time to Advance Research in Science, Academia and Industry January 8, 2007 - 9:59am Addthis WASHINGTON, D.C. - The U.S. Department of Energy's (DOE) Office of Science announced today that 45 projects were awarded a total of 95 million hours of computing time on some of the world's most powerful supercomputers as part of its 2007 Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program. DOE's Under Secretary for Science Dr. Raymond Orbach presented the awards at the Council on Competitiveness in Washington, DC. Supercomputers are playing an increasingly important role in scientific

410

Nonprofit Organizations: Have Your Los Alamos Employees/Retirees Log Hours  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nonprofit Organizations: Have Your Los Alamos Employees/Retirees Log Nonprofit Organizations: Have Your Los Alamos Employees/Retirees Log Hours in VolunteerMatch Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Nonprofit Organizations: Have Your Los Alamos Employees/Retirees Log Hours in VolunteerMatch Lab employees and retirees should log their VolunteerMatch hours to benefit local nonprofits. March 1, 2013 Volunteers help fill sandbags during flood season Volunteers help in many different roles including in healthcare. Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email So far, employees and retirees have volunteered more than 1.2 million volunteer hours. If you are a nonprofit organization that has Lab employees or retirees as

411

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

Nepal from DLR Nepal from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2002 and 2003 for selected sites in Nepal. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DLR DNI GEF GHI hourly data Nepal NREL solar SWERA TILT UNEP Data application/zip icon Download data (zip, 1.2 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage

412

DOE Awards 265 Million Hours of Supercomputing Time to Advance Leading  

Broader source: Energy.gov (indexed) [DOE]

DOE Awards 265 Million Hours of Supercomputing Time to Advance DOE Awards 265 Million Hours of Supercomputing Time to Advance Leading Scientific Research Projects DOE Awards 265 Million Hours of Supercomputing Time to Advance Leading Scientific Research Projects January 17, 2008 - 10:38am Addthis WASHINGTON, DC -The U.S. Department of Energy's (DOE) Office of Science today announced that 265 million processor-hours were awarded to 55 scientific projects, the largest amount of supercomputing resource awards donated in the Department's history and three times that of last year's award. The projects-with applications from aeronautics to astrophysics, and from climate change to combustion research-were chosen based on their potential breakthroughs in the science and engineering research and their suitability of the project for using supercomputers. These awards will

413

Thirty states sign ITER nuclear fusion plant deal 1 hour, 28 minutes ago  

E-Print Network [OSTI]

Thirty states sign ITER nuclear fusion plant deal 1 hour, 28 minutes ago Representatives of more than 30 countries signed a deal on Tuesday to build the world's most advanced nuclear fusion reactor

414

Univariate forecasting of day-ahead hourly electricity demand in the northern grid of India  

Science Journals Connector (OSTI)

Short-term electricity demand forecasts (minutes to several hours ahead) have become increasingly important since the rise of the competitive energy markets. The issue is particularly important for India as it has recently set up a power exchange (PX), which has been operating on day-ahead hourly basis. In this study, an attempt has been made to forecast day-ahead hourly demand of electricity in the northern grid of India using univariate time-series forecasting techniques namely multiplicative seasonal ARIMA and Holt-Winters multiplicative exponential smoothing (ES). In-sample forecasts reveal that ARIMA models, except in one case, outperform ES models in terms of lower RMSE, MAE and MAPE criteria. We may conclude that linear time-series models works well to explain day-ahead hourly demand forecasts in the northern grid of India. The findings of the study will immensely help the players in the upcoming power market in India.

Sajal Ghosh

2009-01-01T23:59:59.000Z

415

Building Technologies Program: Tax Deduction Qualified Software- Hourly Analysis Program (HAP) version 4.41  

Broader source: Energy.gov [DOE]

Provides required documentation that Hourly Analysis Program (HAP) version 4.41 meets Internal Revenue Code 179D, Notice 2006-52, dated April 10, 2009, for calculating commercial building energy and power cost savings.

416

ANTH 376: GENOMICS & ANTHROPOLOGY 4 credit hours (satisfies an SC requirement)  

E-Print Network [OSTI]

1 ANTH 376: GENOMICS & ANTHROPOLOGY 4 credit hours (satisfies an SC variation, health and evolution. Extended Course Description The Human Genome Project and recent advances in genome sequencing techniques have made it possible

417

EPA ENERGY STAR Webcast- Portfolio Manager Office Hours, Focus Topic: Portfolio Manager 2015 Priorities  

Broader source: Energy.gov [DOE]

Portfolio Manager "Office Hours" is a live webinar that gives all users an opportunity to ask their questions directly to EPA in an open forum. We will plan to spend the first 20-30 minutes of each...

418

MAST/GEOG 667: Wind Power Meteorology Fall 2013, 3 credit hours  

E-Print Network [OSTI]

to understand onshore, offshore, and airborne wind power. Topics include: forces affecting and energy from turbines; and wind measurement technologies. Textbooks (not requiredMAST/GEOG 667: Wind Power Meteorology Fall 2013, 3 credit hours 1

Delaware, University of

419

DOE's Office of Science Awards 18 Million Hours of Supercomputing Time to  

Broader source: Energy.gov (indexed) [DOE]

Office of Science Awards 18 Million Hours of Supercomputing Office of Science Awards 18 Million Hours of Supercomputing Time to 15 Teams for Large-Scale Scientific Computing DOE's Office of Science Awards 18 Million Hours of Supercomputing Time to 15 Teams for Large-Scale Scientific Computing February 1, 2006 - 11:14am Addthis WASHINGTON, D.C. - Secretary of Energy Samuel W. Bodman announced today that DOE's Office of Science has awarded a total of 18.2 million hours of computing time on some of the world's most powerful supercomputers to help researchers in government labs, universities, and industry working on projects ranging from designing more efficient engines to better understanding Parkinson's disease. The allocations of computing time are made under DOE's Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program, now in its

420

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

Sri Lanka sites from DLR Sri Lanka sites from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2002 and 2003 for selected sites in Sri Lanka. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DLR DNI GHI hourly data solar Sri Lanka SWERA TILT UNEP Data application/zip icon Download data (zip, 368.2 KiB) Quality Metrics Level of Review Some Review Comment

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

Ghana from DLR Ghana from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2001 and 2002 for selected sites in Ghana. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DLR DNI Ghana GHI hourly data solar SWERA TILT TMY UNEP Data application/zip icon ghanaDLRtimeseries_103.zip (zip, 2.7 MiB) Quality Metrics Level of Review Some Review Comment

422

Commercial and Residential Hourly Load Profiles for all TMY3 Locations in  

Open Energy Info (EERE)

and Residential Hourly Load Profiles for all TMY3 Locations in and Residential Hourly Load Profiles for all TMY3 Locations in the United States Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Hourly load profiles are available for over all TMY3 locations in the United States here. Browse files in this dataset, accessible as individual files and as commercial and residential downloadable ZIP files. This dataset is approximately 4.8GiB compressed or 19GiB uncompressed. July 2nd, 2013 update: Residential High and Low load files have been updated from 366 days in a year for leap years to the more general 365 days in a normal year.

423

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

Bangladesh sites from DLR Bangladesh sites from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2002 and 2003 for selected sites in Bangladesh. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords Bangladesh DLR DNI GHI hourly data solar SWERA UNEP Data application/zip icon Download Data (zip, 1.2 MiB) Quality Metrics Level of Review Some Review Comment

424

Pantex celebrates three million hours without a lost time injury | National  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

three million hours without a lost time injury | National three million hours without a lost time injury | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex celebrates three million hours without a ... Pantex celebrates three million hours without a lost time injury Posted By Office of Public Affairs NNSA Blog NNSA Blog

425

V-002: EMC NetWorker Module for Microsoft Applications Lets Remote Users  

Broader source: Energy.gov (indexed) [DOE]

2: EMC NetWorker Module for Microsoft Applications Lets Remote 2: EMC NetWorker Module for Microsoft Applications Lets Remote Users Execute Arbitrary Code and Local Users Obtain Passwords V-002: EMC NetWorker Module for Microsoft Applications Lets Remote Users Execute Arbitrary Code and Local Users Obtain Passwords October 15, 2012 - 6:00am Addthis PROBLEM: EMC NetWorker Module for Microsoft Applications Lets Remote Users Execute Arbitrary Code and Local Users Obtain Passwords PLATFORM: EMC NetWorker Module for Microsoft Applications 2.2.1, 2.3 prior to build 122, 2.4 prior to build 375 ABSTRACT: EMC NetWorker Module for Microsoft Applications Two Vulnerabilities REFERENCE LINKS: EMC Identifier: ESA-2012-025 Secunia Advisory SA50957 SecurityTracker Alert ID: 1027647 CVE-2012-2284 CVE-2012-2290 IMPACT ASSESSMENT: Medium DISCUSSION:

426

10 CFR 851 Worker Safety and Health Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

10 CFR 851 10 CFR 851 Worker Safety and Health Program 10 CFR 851 Worker Safety and Health Program Office of Health and Safety: Establishes worker safety and health requirements and expectations for the Department to ensure protection of workers from the hazards associated with Department operations. The 10 C.F.R. 851 Work Group is established to promote excellence in the implementation of 10 C.F.R. 851, "Worker Safety and Health" and continuous improvement in the implementation of health and safety programs for the DOE contractor work force. The Work Group provides a collaborative opportunity for DOE to gain insights from the contractor work force and their representatives, and identify and communicate best practices. Focal areas of interest include hazard identification, worker knowledge of aging

427

Hanford Workers Achieve Success in Difficult Glove Box Project at Plutonium  

Broader source: Energy.gov (indexed) [DOE]

Workers Achieve Success in Difficult Glove Box Project at Workers Achieve Success in Difficult Glove Box Project at Plutonium Finishing Plant Hanford Workers Achieve Success in Difficult Glove Box Project at Plutonium Finishing Plant June 26, 2013 - 12:00pm Addthis Team members gather for a photo after safely and successfully completing a complicated glove box separation. Team members gather for a photo after safely and successfully completing a complicated glove box separation. Workers separate highly contaminated glove boxes from their connection points in Hanford’s Plutonium Finishing Plant. Workers separate highly contaminated glove boxes from their connection points in Hanford's Plutonium Finishing Plant. Workers pull a glove box apart and encase each section in a protective covering to prevent exposure.

428

Secretary Chu Thanks Utility Staff and Line Workers For Their Efforts to  

Broader source: Energy.gov (indexed) [DOE]

Thanks Utility Staff and Line Workers For Their Thanks Utility Staff and Line Workers For Their Efforts to Restore Power in the Wake of Hurricane Sandy Secretary Chu Thanks Utility Staff and Line Workers For Their Efforts to Restore Power in the Wake of Hurricane Sandy November 2, 2012 - 11:32am Addthis Secretary Chu meets with Pepco line workers in Maryland on November 1, 2012. | Photo by Sarah Gerrity Secretary Chu meets with Pepco line workers in Maryland on November 1, 2012. | Photo by Sarah Gerrity Jen Stutsman Press Secretary, Office of Public Affairs What are the key facts? Utility companies have deployed 64,000 linemen and utility staff to the front lines to repair downed power lines and bring electricity back online. As they finish up in one area, workers move on to continue assisting other areas still recovering from the storm.

429

V-002: EMC NetWorker Module for Microsoft Applications Lets Remote Users  

Broader source: Energy.gov (indexed) [DOE]

2: EMC NetWorker Module for Microsoft Applications Lets Remote 2: EMC NetWorker Module for Microsoft Applications Lets Remote Users Execute Arbitrary Code and Local Users Obtain Passwords V-002: EMC NetWorker Module for Microsoft Applications Lets Remote Users Execute Arbitrary Code and Local Users Obtain Passwords October 15, 2012 - 6:00am Addthis PROBLEM: EMC NetWorker Module for Microsoft Applications Lets Remote Users Execute Arbitrary Code and Local Users Obtain Passwords PLATFORM: EMC NetWorker Module for Microsoft Applications 2.2.1, 2.3 prior to build 122, 2.4 prior to build 375 ABSTRACT: EMC NetWorker Module for Microsoft Applications Two Vulnerabilities REFERENCE LINKS: EMC Identifier: ESA-2012-025 Secunia Advisory SA50957 SecurityTracker Alert ID: 1027647 CVE-2012-2284 CVE-2012-2290 IMPACT ASSESSMENT: Medium DISCUSSION:

430

Computer Code Gives Astrophysicists First Full Simulation of Star's Final Hours  

ScienceCinema (OSTI)

The precise conditions inside a white dwarf star in the hours leading up to its explosive end as a Type Ia supernova are one of the mysteries confronting astrophysicists studying these massive stellar explosions. But now, a team of researchers, composed of three applied mathematicians at the U.S. Department of Energy's (DOE) Lawrence Berkeley National Laboratory and two astrophysicists, has created the first full-star simulation of the hours preceding the largest thermonuclear explosions in the universe.

Andy Nonaka

2010-01-08T23:59:59.000Z

431

Synthesis of hourly rainfall by a Monte Carlo method using a sixth-order Markov chain  

E-Print Network [OSTI]

the modeling scheme that reproduces the historical sequences. Hudlow (1967) and the author designed a model for producing synthetic rainfall sequences based on these probabilities. Hudlow us d the model to generate three selected storms of the stationary... - or ? Dry Hour (t-29) 30 complete scheme of operating the two Narkov chains to produce each synthetic hourly value. CHAPTER IV TESTING OF THE I'1ODEL Parameter Test Applications The purpose of testing a model for rainfall synthesis is to ensure...

Dale, Walter Marvin

2012-06-07T23:59:59.000Z

432

Anticipated dose to workers for Plutonium Stabilization and Handling at PFP Project W-460  

SciTech Connect (OSTI)

Report provides estimates of expected whole body and extremity radiological dose to workers conducting planned Pu stabilization and packaging operations at PFP.

LILLY, J.T.

1999-11-30T23:59:59.000Z

433

E-Print Network 3.0 - australian workers compensation Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

comprehensive solution to aid health-workers in their daily tasks, at a low-cost and high penetration rate Source: Khandoker, Ahsan - Department of Electrical and Electronic...

434

E-Print Network 3.0 - agricultural workers exposed Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

any UFIFAS employee who is performing cultural tasks (tillage, planting, weeding... advisor tasks are not deemed agricultural workers. Certification means recognition by the...

435

E-Print Network 3.0 - accidents--worker compensation laws Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

> >> 1 LEHIGH UNIVERSITY RESEARCH AND TESTING AGREEMENT Summary: ,000,000 aggregate. Automobile Liability at 1,000,000 each accident. Workers' Compensation at statutory limits......

436

E-Print Network 3.0 - automobile foundry workers Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search Powered by Explorit Topic List Advanced Search Sample search results for: automobile foundry workers Page: << < 1 2 3 4 5 > >> 1 TECHNICAL POLLUTION PREVENTION GUIDE For...

437

E-Print Network 3.0 - advanced worker protection Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

these procedures are protected from hazardous energy. Workers not participating in the lockout must treat de... Coordinate the lockout of affected work forces Provide continuity of...

438

E-Print Network 3.0 - anatomy laboratory workers Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to workers, supervisors... , and equipment custodians. 2 Procedures 2.1 Establishing a Lockout Step Person ... Source: Wechsler, Risa H. - Kavli Institute for Particle Astrophysics...

439

E-Print Network 3.0 - administration related workers Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Science 22 Rev. No.: 2.0 Contractor Environmental Safety and Health Manual Title: LockoutTagout Program Summary: of Lock and Tag form. The authorized worker provides...

440

E-Print Network 3.0 - aircraft maintenance workers Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mathematics 97 Rev. No.: 2.0 Contractor Environmental Safety and Health Manual Title: LockoutTagout Program Summary: worker performing the servicing or maintenance, is provided...

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Predictors of occupational skin disease among seafood processing workers in the Western Cape.  

E-Print Network [OSTI]

??Includes abstract. Occupational skin disease is common in seafood processing workers. While previous studies have reported an increased prevalence of symptoms (as high as 50%) (more)

Burdzik, Amy.

2012-01-01T23:59:59.000Z

442

ORISE: How ORISE is Making a Difference in Worker Health Studies  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

capability to identify beryllium sensitization among workers. The ORISE Beryllium Testing Laboratory is one of only four performing the test in the United States. Radiation...

443

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Genevieve Saur (Primary Contact), Chris Ainscough. National Renewable Energy Laboratory (NREL) 15013 Denver West Parkway Golden, CO 80401-3305 Phone: (303) 275-3783 Email: genevieve.saur@nrel.gov DOE Manager HQ: Erika Sutherland Phone: (202) 586-3152 Email: Erika.Sutherland@ee.doe.gov Project Start Date: October 1, 2010 Project End Date: Project continuation and direction determined annually by DOE Fiscal Year (FY) 2012 Objectives Corroborate recent wind electrolysis cost studies using a * more detailed hour-by-hour analysis. Examine consequences of different system configuration * and operation for four scenarios, at 42 sites in five

444

September 16, 2008; HSS/Union Working Group Meeting, Former Worker and Energy Compensation Programs, CAIRS Reporting, Central Worker Data Tracking - Agenda  

Broader source: Energy.gov (indexed) [DOE]

Working Group Meeting Working Group Meeting September 16, 2008 1:00 - 3:00 pm EST FORS 7E-069 SUBJECT: Former Worker/Energy Compensation Programs CAIRS Reporting Central Worker Data Tracking Meeting Facilitation: Building &Construction Trades Department Center for Construction Research &Training [Pete Stafford, Patricia Quinn] Agenda I. Former Worker Screening: Outreach, Improved Facilitation, Collective efforts and issues 1. Screening Programs (historical and future needs) - OccMed/contractor interaction - Program improvements [i.e., aspects of latent chronic illness] - Subcontractor population - Improved program management -- Standards for preventing future cases [Proper screening/tracking] -- Address contractor; production vs. construction; Complex wide portability

445

Radiation worker health study: Scoping phase: Final report  

SciTech Connect (OSTI)

The purpose of this project was to develop a scope of work for an epidemiologic study of the health of workers at nuclear utilities. We propose a study of cancer mortality among electric utility personnel assigned to nuclear generating stations. The primary goal of the study is to provide information to assist in maintaining a healthy work environment in electric utilities; such information would also help to resolve some uncertainties about the effects of low-level ionizing radiation by providing direct observation of human beings exposed at low doses and dose rates. Workers at each nuclear generating station would be identified from company records, their dose histories would be collected, and their vital status would be ascertained as well as cause of death, if deceased. This study would be historical in that past records would be used and prospective in that employees would continue to be followed in future years. Our estimates indicate that a study population composed of employees and contractors at all commercial nuclear generating stations would total approximately 2,000,000 person-years of observation and would be adequate to detect (or exclude) a 50 percent increase in leukemia with reasonable statistical power. 44 refs., 4 figs., 3 tabs.

Dreyer, N.A.; Wilkinson, G.S.; Loughlin, J.E.

1988-11-01T23:59:59.000Z

446

Prediction of clock time hourly global radiation from daily values over  

Open Energy Info (EERE)

Prediction of clock time hourly global radiation from daily values over Prediction of clock time hourly global radiation from daily values over Bangladesh Dataset Summary Description (Abstract): A need for predicting hourly global radiation exists for many locations particularly in Bangladesh for which measured values are not available and daily values have to be estimated from sunshine data. The CPRG model has been used to predict values of hourly Gh for Dhaka (23.770N, 90.380E), Chittagong (22.270N, 91.820E) and Bogra (24.850N, 89.370E) for = ±7.50, ±22.50, ±37.50, ±52.50, ±67.50, ±82.50 and ±97.50 i.e., for ±1/2, ±3/2, ±5/2, ±7/2, ±9/2, ±11/2, ±13/2 hours before and after solar noon and the computed values for different months are symmetrical about solar noon whereas for many months experimental data show a clear asymmetry. To obtain improved

447

September 16, 2008; HSS/Union Working Group Meeting, Former Worker and Energy Compensation Programs, CAIRS Reporting, Central Worker Data Tracking … Meeting Summary  

Broader source: Energy.gov (indexed) [DOE]

7 10-10-08 Draft 7 10-10-08 Draft HSS/Union Meeting To Address Former Worker and Energy Employee Occupational Illness Compensation Programs, CAIRS Reporting, and Central Worker Data Tracking September 16, 2008 Integrated Executive Summary and Final Action List Background: HSS and the labor unions who participated in the initial 2007 HSS Focus Group meetings agreed to a path forward in which various unions combined to form core working groups to address union identified health and safety issues by topical area. The following is an overview of actions/activities identified in the September 16 HSS/Union meeting to address Former Worker and the Energy Employee Occupational Illness Compensation Programs, CAIRS Reporting, and Central Worker Data Tracking interests and

448

Energy Employees Occupational Illness Compensation Program Act (EEOICPA) and Former Worker Medical Screening Program (FWP) - Agency Roles/Programs for Assisting DOE Covered Workers, January 2014  

Broader source: Energy.gov (indexed) [DOE]

FWP FWP FWP UNITED STATES DEPARTMENT OF LABOR Department of Energy (DOE) - Former Worker Medical Screening Program and Responsibilities under EEOICPA * Former Worker Medical Screening Program (FWP) FWP provides no-cost medical screenings to all former DOE Federal, contractor, and subcontractor employees. The screening focuses on the early detection of health conditions that may be related to occupational exposures such as beryllium, asbestos, radiation, silica, etc. * Medical screenings include a physical exam, hearing test,

449

Statistical correlation between hourly and daily values of solar radiation on horizontal surface at sea level in the Italian climate  

E-Print Network [OSTI]

219- Statistical correlation between hourly and daily values of solar radiation on horizontal- nalières du rayonnement solaire. Abstract. 2014 The knowledge of hourly data of solar radiation is required data measured in Italian stations and propose a method to estimate hourly solar radiation

Boyer, Edmond

450

On a QUEST to Save Oakland 8.4 Gigawatt Hours | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

On a QUEST to Save Oakland 8.4 Gigawatt Hours On a QUEST to Save Oakland 8.4 Gigawatt Hours On a QUEST to Save Oakland 8.4 Gigawatt Hours August 13, 2010 - 3:38pm Addthis Lorelei Laird Writer, Energy Empowers Derrick Rebello wants to make the downtown corridor of Oakland, California, one of the greenest in the nation. Through the new Downtown Oakland Targeted Measure Saturation Project, he and his company, Quantum Energy Services and Technologies (QUEST), are targeting the city's 120-block business district to make as many buildings as possible highly energy efficient. "The goal is to really leave no stone unturned," said Rebello, president of QUEST. "We are trying to achieve 80 percent participation. And of those participating buildings, we are focusing on getting a 20 percent reduction

451

NOAA Awarded 2.6 Million Processor Hours at NERSC to Run Climate Change  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NOAA Awarded 2.6 NOAA Awarded 2.6 Million Processor Hours at NERSC to Run Climate Change Models NOAA Awarded 2.6 Million Processor Hours at NERSC to Run Climate Change Models September 11, 2008 WASHINGTON, DC - The U.S. Department of Energy's (DOE) Office of Science will make available more than 10 million hours of computing time for the U.S. Commerce Department's National Oceanic and Atmospheric Administration (NOAA) to explore advanced climate change models at three of DOE's national laboratories as part of a three-year memorandum of understanding on collaborative climate research signed today by the two agencies. NOAA will work with climate change models as well as perform near real-time high-impact (non-production) weather prediction research using computing time on DOE Office of Science resources including two of the world's top

452

Developing hourly weather data for locations having only daily weather data  

SciTech Connect (OSTI)

A methodology was developed to modify an hourly TMY weather tape to be representative of a location for which only average daily weather parameters were avilable. Typical hourly and daily variations in solar flux, and other parameters, were needed to properly exercise a computer model to predict the transient performance of a solar controlled greenhouse being designed for Riyadh, Saudi Arabia. The starting point was a TMY tape for Yuma, Arizona, since the design temperatures for summer and winter are nearly identical for Yuma and Riyadh. After comparing six of the most important weather variables, the hourly values on the Yuma tape were individually adjusted to give the same overall daily average conditions as existed in the long-term Riyadh data. Finally, a statistical analysis was used to confirm quantitatively that the daily variations between the long term average values for Riyadh and the modified TMY weather tape for Yuma matched satisfactorily.

Talbert, S.G.; Herold, K.E.; Jakob, F.E.; Lundstrom, D.K.

1983-06-01T23:59:59.000Z

453

Sub-Hour Solar Data for Power System Modeling From Static Spatial Variability Analysis: Preprint  

SciTech Connect (OSTI)

High penetration renewable integration studies need high quality solar power data with spatial-temporal correlations that are representative of a real system. This paper will summarize the research relating sequential point-source sub-hour global horizontal irradiance (GHI) values to static, spatially distributed GHI values. This research led to the development of an algorithm for generating coherent sub-hour datasets that span distances ranging from 10 km to 4,000 km. The algorithm, in brief, generates synthetic GHI values at an interval of one-minute, for a specific location, using SUNY/Clean Power Research, satellite-derived, hourly irradiance values for the nearest grid cell to that location and grid cells within 40 km.

Hummon, M.; Ibanez, E.; Brinkman, G.; Lew, D.

2012-12-01T23:59:59.000Z

454

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

China sites from DLR China sites from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2002 and 2003 for selected sites in China. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords China DLR DNI GEF GHI solar SWERA UNEP Data application/zip icon Download Data (zip, 953.6 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage

455

Healthcare organizationeducation partnerships and career ladder programs for health care workers  

Science Journals Connector (OSTI)

Abstract Increasing concerns about quality of care and workforce shortages have motivated health care organizations and educational institutions to partner to create career ladders for frontline health care workers. Career ladders reward workers for gains in skills and knowledge and may reduce the costs associated with turnover, improve patient care, and/or address projected shortages of certain nursing and allied health professions. This study examines partnerships between health care and educational organizations in the United States during the design and implementation of career ladder training programs for low-skill workers in health care settings, referred to as frontline health care workers. Mixed methods data from 291 frontline health care workers and 347 key informants (e.g., administrators, instructors, managers) collected between 2007 and 2010 were analyzed using both regression and fuzzy-set qualitative comparative analysis (QCA). Results suggest that different combinations of partner characteristics, including having an education leader, employer leader, frontline management support, partnership history, community need, and educational policies, were necessary for high worker career self-efficacy and program satisfaction. Whether a worker received a wage increase, however, was primarily dependent on leadership within the health care organization, including having an employer leader and employer implementation policies. Findings suggest that strong partnerships between health care and educational organizations can contribute to the successful implementation of career ladder programs, but workers' ability to earn monetary rewards for program participation depends on the strength of leadership support within the health care organization.

Janette S. Dill; Emmeline Chuang; Jennifer C. Morgan

2014-01-01T23:59:59.000Z

456

KNOWLEDGE WORKER PRODUCTIVITY A Journey from Islands of Knowledge to Mutual Understanding in  

E-Print Network [OSTI]

KNOWLEDGE WORKER PRODUCTIVITY A Journey from Islands of Knowledge to Mutual Understanding in Global, use of collaboration technologies, and engagement to improve knowledge worker productivity during MORE "A Journey from Islands of Knowledge to Mutual Under- standing in Global Business Meetings," media

Das, Rhiju

457

Worker Protection Program for DOE (Including the National Nuclear Security Administration) Federal Employees  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses, and accidental losses by providing Department of Energy (DOE), including National Nuclear Security Administration (NNSA), Federal workers with a safe and healthful workplace. Cancels DOE O 440.1A. Certified 6/17/2011. Canceled by DOE O 440.1B Chg 1.

2007-05-17T23:59:59.000Z

458

Radon dose calculation methodology for underground workers in the Czech Republic  

Science Journals Connector (OSTI)

......workers in the caves. A review was made of various approaches...exceeded. The law on mining stipulates that time...device was used as a standard. The measurements were...2006 and by the research plan No MSM6840770040 of the...workers in the caves. A review was made of various approaches......

L. Thinova; K. Rovenska

2011-05-01T23:59:59.000Z

459

Worker Protection Program for DOE (Including the National Nuclear Security Administration) Federal Employees  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses, and accidental losses by providing DOE and NNSA Federal workers with a safe and healthful workplace. Chg 1 dated 8-21-12. Cancels DOE M 440.1-1A. Admin Chg 1, dated 3-14-13.

2007-05-17T23:59:59.000Z

460

Implementation Guide for Use with 10 CFR Part 851, Worker Safety and Health Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides supplemental information and describes implementation practices to assist contractors in effectively developing, managing and implementing worker safety and health programs required by 10 Code of Federal Regulations, Part 851, Worker Safety and Health Program. Canceled by DOE G 440.1-1B.

2006-12-27T23:59:59.000Z

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Computer Code Gives Astrophysicists First Full Simulation of Star's Final Hours  

ScienceCinema (OSTI)

The precise conditions inside a white dwarf star in the hours leading up to its explosive end as a Type Ia supernova are one of the mysteries confronting astrophysicists studying these massive stellar explosions. But now, a team of researchers, composed of three applied mathematicians at the U.S. Department of Energy's (DOE) Lawrence Berkeley National Laboratory and two astrophysicists, has created the first full-star simulation of the hours preceding the largest thermonuclear explosions in the universe. http://www.lbl.gov/cs/Archive/news091509.html

Applin, Bradford

2013-05-29T23:59:59.000Z

462

Recovery Act Workers Clear Reactor Shields from Brookhaven Lab  

Broader source: Energy.gov (indexed) [DOE]

UPTON, N.Y. - American Recovery and Reinvestment Act UPTON, N.Y. - American Recovery and Reinvestment Act workers are in the final stage of decommissioning a nuclear reactor after they recently removed thick steel shields once used to absorb neutrons produced for research. The Brookhaven National Laboratory is using $39 million from the Recovery Act to decommission the Brookhaven Graphite Research Reactor, the world's first reactor built solely for peaceful research purposes. The decommissioning is slated for completion later this year and will end Office of Environmental Management legacy cleanup activities at the Lab. The neutron shields were located on the north and south sides of a 700-ton graphite pile. The three-inch-thick shields absorbed neutrons that escaped from the graphite pile. The shields also limited movement of the pile when the reactor was in opera-

463

Radiological Worker Training Power Point Slides for App. A  

Broader source: Energy.gov (indexed) [DOE]

30-2008 30-2008 DOE HANDBOOK Radiological Worker Training DOE-HDBK-1130-2008 Overheads December 2008 Reaffirmed 2013 OT 1.1 DOE-HDBK-1130-2008 Overhead 1.1 Regulatory Documents Objectives: * Identify the hierarchy of regulatory documents. * Define the purposes of 10 CFR Parts 820, 830 and 835. * Define the purpose of the DOE Radiological Control Standard. OT 1.2 DOE-HDBK-1130-2008 Overhead 1.2 Regulatory Documents (cont.) Objectives: * Define the terms "shall" and "should" as used in the above documents. * Describe the role of the Defense Nuclear Facilities Safety Board (DNFSB) at DOE sites and facilities. OT 1.3 DOE-HDBK-1130-2008 Overhead 1.3 DOE Radiological Health and Safety Policy * Conduct oversight to ensure compliance and that appropriate radiological work

464

Beryllium-Associated Worker Registry Data Collection and Management Guidance  

Broader source: Energy.gov (indexed) [DOE]

7 7 June 2007 DOE TECHNICAL STANDARD Beryllium-Associated Worker Registry Data Collection and Management Guidance U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited NOT MEASUREMENT SENSITIVE DOE-STD-1187-2007 ii Available on the Department of Energy Technical Standards Program Web site at http://www.hss.energy.gov/NuclearSafety/techstds/ DOE-STD-1187-2007 iii FOREWORD 1. This standard provides acceptable methods for compliance with the requirements of paragraph 10 CFR 850.39 "Recordkeeping and Use of Information." Use of this standard is not mandatory. Users should review the document and determine if it meets their purpose. 2. Comments (recommendations, additions, and deletions) that may be of use in

465

Former Worker Medical Screening Program Surveillance Case Definitions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8/11 8/11 Former Worker Medical Screening Program Surveillance case definitions Asbestosis without pleural disease: a reported history of exposure to asbestos, or job title with a reasonable likelihood of asbestos exposure plus a B-reading of standard PA chest film demonstrating bilateral irregular parenchymal opacities (shape and size: s,t,u) with profusion score of 1/0 or greater absence of a B-reader notation of findings of unilateral or bilateral pleural thickening consistent with pneumoconiosis not likely attributable to another agent known to cause pneumoconiosis Asbestosis with pleural disease: a reported history of exposure to asbestos, or job title with a reasonable likelihood of asbestos exposure plus a B-reading of standard PA chest film demonstrating bilateral irregular

466

Mortality among female workers at a thorium-processing plant  

SciTech Connect (OSTI)

The mortality patterns among a cohort of 677 female workers at a thorium-processing plant are reported for the period from 1940 to 1982. Of the 677 women, 165 were reported dead; 459 were still alive; and 53 (7.8%) were lost to follow-up. The standardized mortality ratios from all causes (0.74), all cancers (0.53), and circulatory diseases (0.66) were significantly below those for the general US population. In this cohort, 5 deaths due to lung cancer and 1 death from leukemia were observed, with 4.53 and 1.69 deaths expected, respectively. No deaths from cancer of the liver, pancreas, or bone were observed. Poisson regression analysis was used for an internal comparison within the cohort. The results of the Poisson regression analysis showed no significant effect on mortality rates of all causes and cancers from the study factors, including job classification, duration of employment, and time since first employment.

Liu, Zhiyuan; Lee, Tze-San

1994-05-01T23:59:59.000Z

467

Radiological Worker Training Power Point Slides for App. A  

Broader source: Energy.gov (indexed) [DOE]

30-2008 30-2008 DOE HANDBOOK Radiological Worker Training DOE-HDBK-1130-2008 Overheads December 2008 Reaffirmed 2013 OT 1.1 DOE-HDBK-1130-2008 Overhead 1.1 Regulatory Documents Objectives: * Identify the hierarchy of regulatory documents. * Define the purposes of 10 CFR Parts 820, 830 and 835. * Define the purpose of the DOE Radiological Control Standard. OT 1.2 DOE-HDBK-1130-2008 Overhead 1.2 Regulatory Documents (cont.) Objectives: * Define the terms "shall" and "should" as used in the above documents. * Describe the role of the Defense Nuclear Facilities Safety Board (DNFSB) at DOE sites and facilities. OT 1.3 DOE-HDBK-1130-2008 Overhead 1.3 DOE Radiological Health and Safety Policy * Conduct oversight to ensure compliance and that appropriate radiological work

468

Former Worker Medical Screening Program Surveillance Case Definitions  

Broader source: Energy.gov (indexed) [DOE]

8/11 8/11 Former Worker Medical Screening Program Surveillance case definitions Asbestosis without pleural disease: a reported history of exposure to asbestos, or job title with a reasonable likelihood of asbestos exposure plus a B-reading of standard PA chest film demonstrating bilateral irregular parenchymal opacities (shape and size: s,t,u) with profusion score of 1/0 or greater absence of a B-reader notation of findings of unilateral or bilateral pleural thickening consistent with pneumoconiosis not likely attributable to another agent known to cause pneumoconiosis Asbestosis with pleural disease: a reported history of exposure to asbestos, or job title with a reasonable likelihood of asbestos exposure plus a B-reading of standard PA chest film demonstrating bilateral irregular

469

Department of Energy Cites Savannah River Nuclear Solutions, LLC for Worker  

Broader source: Energy.gov (indexed) [DOE]

Solutions, LLC Solutions, LLC for Worker Safety and Health Violations Department of Energy Cites Savannah River Nuclear Solutions, LLC for Worker Safety and Health Violations November 9, 2012 - 5:50pm Addthis News Media Contact (202) 586-4940 WASHINGTON - The U.S. Department of Energy has issued a Preliminary Notice of Violation (PNOV) to Savannah River Nuclear Solutions, LLC (SRNS) for violations of the Department's worker safety and health regulations. The violations are associated with a July 1, 2011, incident that occurred while a worker was using a Tele-Tower® scaffold to perform facility modifications in the Purification Area Vault of Building 105-K in the K-Area Complex at the Savannah River Site (SRS). The SRNS worker fell from the scaffold and was hospitalized with injuries to his head and

470

Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin |  

Broader source: Energy.gov (indexed) [DOE]

Accomplish Cleanup of Second Cold War Coal Ash Accomplish Cleanup of Second Cold War Coal Ash Basin Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin American Recovery and Reinvestment Act workers recently cleaned up a second basin containing coal ash residues from Cold War operations at the Savannah River Site (SRS). About $24 million from the Recovery Act funded the environmental restoration project, allowing SRS to complete the project at least five years ahead of schedule. The work is part of a larger Recovery Act cleanup of the P Area scheduled for completion by the end of September 2011. Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin More Documents & Publications Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin Recovery Act Workers Add Time Capsule Before Sealing Reactor for Hundreds

471

14th Annual Joint DOE/EFCOG Chemical Safety and Worker Safety and Health  

Broader source: Energy.gov (indexed) [DOE]

4th Annual Joint DOE/EFCOG Chemical Safety and Worker Safety and 4th Annual Joint DOE/EFCOG Chemical Safety and Worker Safety and Health Program (10 CFR 851) Workshop 14th Annual Joint DOE/EFCOG Chemical Safety and Worker Safety and Health Program (10 CFR 851) Workshop Workshop Dates: March 13-15, 2012 The workshop served to promote continuous improvement in the implementation of 851 through the shared experiences and enhancements of a variety of DOE stakeholder communities. Panel members from Savannah River Nuclear Solutions, the United Steel Workers, the DOE Offices of Environmental Management and the National Nuclear Security Administration, and the HSS Offices of Worker Safety and Health Policy and Enforcement and Oversight, provided 851 implementation perspectives and an opportunity for interactive discussion and exchange with attendees.

472

10 C.F.R. 851: Worker Safety and Health Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51: Worker Safety and Health Program 51: Worker Safety and Health Program 10 C.F.R. 851: Worker Safety and Health Program Stakeholders: DOE contractors; Employee(s) of DOE contractors Scope: 10 C.F.R. 851 outlines the requirements for a worker safety/health program to ensure that DOE contractors and their workers operate a safe workplace. Additionally, 10 C.F.R. 851 establishes procedures for investigating whether a violation of a requirement of this part has occurred, for determining the nature and extent of any such violation, and for imposing an appropriate remedy. Summary: Subpart A - General Provisions: Compliance Order: 10 C.F.R. § 851.4 The Secretary of Energy may issue a Compliance Order to any DOE contractor which: Identifies violations of enumerated requirements Mandates a remedy to address these violations and;

473

Energy Employees Occupational Illness Compensation Program Act Interviews of Current and Former Workers  

Broader source: Energy.gov (indexed) [DOE]

February 1, 2010 February 1, 2010 MEMORANDUM FOR DISTRIBUTION "" ( "· FROM: DANIEL B. PONE~ SUBJECT: Energy Employees Occupational Illness Compensation Program Act Interviews of Current and Former Workers The Department embraces its responsibility for and commitment to the health and well- being of the Department of Energy's (DOE) current and former workers, both Federal and contractor employees. Two key programs that advance DO E's commitment to its former and current workers are the Department of Labor (DOL) managed Energy Employees Occupational Illness Compensation Program (EEOICP) and the Former Worker Medical Screening Program. In the context of support to EEOICP, DOE's role is to work on behalf of the program claimants to make sure that all available worker and

474

Guidance Related to Analysis of Impacts to Workers in National Policy Act  

Broader source: Energy.gov (indexed) [DOE]

Guidance Related to Analysis of Impacts to Workers in National Guidance Related to Analysis of Impacts to Workers in National Policy Act (NEPA) Documentation Guidance Related to Analysis of Impacts to Workers in National Policy Act (NEPA) Documentation The purpose of this memorandum is to provide general guidance regarding the analysis of impacts to workers in DOE environmental impact statements (EISs) and environmental assessments (EAs) in order to assist DOE program and field offices in meeting the requirements of NEPA and to establish a general consistency in the Department's NEPA documentation. This guidance was prompted by several questions raised in this regard and was developed by the Office of NEPA Project Assistance, after consultation with the Office of General Counsel. Guidance Related to Analysis of Impacts to Workers in National Policy Act

475

DOE Order 440. 1 B: Worker Protection Program for DOE (Including NNSA)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0. 1 B: Worker Protection Program for DOE (Including 0. 1 B: Worker Protection Program for DOE (Including NNSA) Federal Employees DOE Order 440. 1 B: Worker Protection Program for DOE (Including NNSA) Federal Employees Stakeholders: DOE and NNSA employees Scope: DOE Order 440.1 B establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses, and accidental losses by providing Department of Energy, including National Nuclear Security Administration (NNSA), Federal workers with a safe and healthful workplace. Summary: Among the requirements of DOE Order 440.1 B, the Department must provide its employees, including NNSA, a number of protections relating to whistle blowing guidelines. The relevant section of requirements includes: 4. REQUIREMENTS. DOE elements must:

476

Idaho Site Completes Cleanup with Help from Workers who Shipped Waste  

Broader source: Energy.gov (indexed) [DOE]

Site Completes Cleanup with Help from Workers who Shipped Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago From the 1950s until the 1980s, workers at the former Rocky Flats Plant near Denver, Colo., sent hundreds of thousands of barrels and boxes of radioactive and hazardous waste to the Idaho National Laboratory (INL) for disposal both above and below ground. Now, some of those who sent the Cold War weapons waste to Idaho are helping identify the waste in pits dug up for the first time in more than 40 years. Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago More Documents & Publications Sound Project Management, Safe and Efficient Work Lead to Savings for More Recovery Act Cleanup

477

Former Construction Worker Finds New Career in Solar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Former Construction Worker Finds New Career in Solar Former Construction Worker Finds New Career in Solar Former Construction Worker Finds New Career in Solar August 25, 2010 - 4:00pm Addthis Eco Technologies, Inc., hired eleven workers to install these solar panels at the Hillsborough County judicial center. | Photo courtesy of Hillsborough County Eco Technologies, Inc., hired eleven workers to install these solar panels at the Hillsborough County judicial center. | Photo courtesy of Hillsborough County Kevin Craft After Eco Technologies, Inc., received a contract to install solar panels at Hillsborough County, Fla.'s judicial center, company president Andrew Tanner realized a larger staff was needed to complete the project. So Tanner hired 11 additional crew members and trained them in basic solar-panel installation. The new crew members have been working at the

478

Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint  

Broader source: Energy.gov (indexed) [DOE]

Recovery Act Workers Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint RICHLAND, Wash. - The Hanford Site is looking greener these days after American Recovery and Reinvestment Act workers revegetated 166 acres across 12 waste sites, planting over 1,100 pounds of seeds and about 280,000 pounds of mulch. The largest of the sites, known as the BC Control Area, is an approximately 13-square-mile area associated with a waste disposal system used during Hanford operations. Recovery Act workers remediated and reseeded a densely contaminated 140- acre portion of that area after disposing of more than 370,000 tons of contaminated soil. Recovery Act workers employed by DOE contractor CH2M HILL Plateau Remediation Company have remediated 61 waste sites,

479

Idaho Site Completes Cleanup with Help from Workers who Shipped Waste  

Broader source: Energy.gov (indexed) [DOE]

Site Completes Cleanup with Help from Workers who Shipped Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago From the 1950s until the 1980s, workers at the former Rocky Flats Plant near Denver, Colo., sent hundreds of thousands of barrels and boxes of radioactive and hazardous waste to the Idaho National Laboratory (INL) for disposal both above and below ground. Now, some of those who sent the Cold War weapons waste to Idaho are helping identify the waste in pits dug up for the first time in more than 40 years. Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago More Documents & Publications Sound Project Management, Safe and Efficient Work Lead to Savings for More Recovery Act Cleanup

480

Low Prevalence of Chronic Beryllium Disease among Workers at a Nuclear Weapons Research and Development Facility  

SciTech Connect (OSTI)

To study the prevalence of beryllium sensitization (BeS) and chronic beryllium disease (CBD) in a cohort of workers from a nuclear weapons research and development facility. We evaluated 50 workers with BeS with medical and occupational histories, physical examination, chest imaging with HRCT (N=49), and pulmonary function testing. Forty of these workers also underwent bronchoscopy for bronchoalveolar lavage (BAL) and transbronchial biopsies. The mean duration of employment at the facility was 18 yrs and the mean latency (from first possible exposure) to time of evaluation was 32 yrs. Five of the workers had CBD at the time of evaluation (based on histology or HRCT); three others had evidence of probable CBD. These workers with BeS, characterized by a long duration of potential Be exposure and a long latency, had a low prevalence of CBD.

Arjomandi, M; Seward, J P; Gotway, M B; Nishimura, S; Fulton, G P; Thundiyil, J; King, T E; Harber, P; Balmes, J R

2010-01-11T23:59:59.000Z

Note: This page contains sample records for the topic "worker median hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin |  

Broader source: Energy.gov (indexed) [DOE]

Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin American Recovery and Reinvestment Act workers recently cleaned up a second basin containing coal ash residues from Cold War operations at the Savannah River Site (SRS). About $24 million from the Recovery Act funded the environmental restoration project, allowing SRS to complete the project at least five years ahead of schedule. The work is part of a larger Recovery Act cleanup of the P Area scheduled for completion by the end of September 2011. Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin More Documents & Publications EIS-0220: Final Environmental Impact Statement EIS-0220: Final Environmental Impact Statement

482

Kidney cancer and hydrocarbon exposures among petroleum refinery workers  

SciTech Connect (OSTI)

To evaluate the hypothesis of increased kidney cancer risk after exposure to hydrocarbons, especially those present in gasoline, we conducted a case-control study in a cohort of approximately 100,000 male refinery workers from five petroleum companies. A review of 18,323 death certificates identified 102 kidney cancer cases, to each of whom four controls were matched by refinery location and decade of birth. Work histories, containing an average of 15.7 job assignments per subject, were found for 98% of the cases and 94% of the controls. Tb each job, industrial hygienists assigned semiquantitative ratings for the intensity and frequency of exposures to three hydrocarbon categories: nonaromatic liquid gasoline distillates, aromatic hydrocarbons, and the more volatile hydrocarbons. Ratings of {open_quotes}present{close_quotes} or {open_quotes}absent{close_quotes} were assigned for seven additional exposures: higher boiling hydrocarbons, polynuclear aromatic hydrocarbons, asbestos, chlorinated solvents, ionizing radiation, and lead. Each exposure had either no association or a weak association with kidney cancer. For the hydrocarbon category of principal a priori interest, the nonaromatic liquid gasoline distillates, the estimated relative risk (RR) for any exposure above refinery background was 1.0 (95% confidence interval [CI] 0.5-1.9). Analyses of cumulative exposures and of exposures in varying time periods before kidney cancer occurrence also produced null or near-null results. In an analysis of the longest job held by each subject (average duration 9.2 years or 40% of the refiner&y work history), three groups appeared to be at increased risk: laborers (RR = 1.9,95% CI 1.0-3.9); workers in receipt, storage, and movements (RR = 2.5,95% CI 0.9-6.6); and unit cleaners (RR = 2.3, 95% CI 0.5-9.9). 53 refs., 7 tabs.

Poole, C.; Dreyer, N.A.; Satterfield, M.H. [Epidemiology Resources Inc., Newton Lower Falls, MA (United States); Levin, L. [Drexel Univ., Philadelphia, PA (United States)

1993-12-01T23:59:59.000Z

483

Circadian Variation of Melatonin, Light Exposure, and Diurnal Preference in Day and Night Shift Workers of Both Sexes  

Science Journals Connector (OSTI)

...nights followed by seven days in offshore oil installation workers.Neurosci...rhythms in rotating shift workers offshore.J Biol Rhythms 2007;22:368-70...6-sulphatoxymelatonin rhythm in shiftworkers on offshore oil installations during a 2-week...

Kyriaki Papantoniou; Oscar J. Pozo; Ana Espinosa; Josep Marcos; Gemma Castao-Vinyals; Xavier Basagaa; Ferran Calduch Ribas; Joan Mirabent; Jordi Martn; Gemma Carenys; Celia Reyes Martn; Benita Middleton; Debra J. Skene; and Manolis Kogevinas

2014-07-01T23:59:59.000Z

484

Argonne National Laboratory-West, Former Production Workers Screening Projects (now known as the Idaho National Laboratory)  

Broader source: Energy.gov [DOE]

Argonne National Laboratory-West, Former Production Workers Screening Projects (now known as the Idaho National Laboratory)

485

NETL: News Release - DOE Awards Local Researcher with 3 Million Hours on  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8, 2008 8, 2008 DOE Awards Local Researcher with 3 Million Hours on Premier Supercomputer Morgantown, W.Va.-The U.S. Department of Energy's (DOE) Office of Science announced today that a scientist at DOE's National Energy Technology Laboratory (NETL) has been awarded 3 million hours of processor time to conduct advanced research on fossil fuel power plants on one of the world's most powerful supercomputers. http://energy.gov/news/5849.htm The Office of Science awarded the supercomputer hours to Madhava Syamlal, a scientist at NETL, as one of 55 nationwide recipients who received a total of 265 million processor hours. Syamlal, along with his team of co-investigators, will use the powerful Cray XT4 supercomputer at ORNL to vastly increase the speed of coal gasifier simulations to aid in the design and optimization of the power plants. His team is composed of Thomas O'Brien (NETL), Chris Guenther (NETL), Sreekanth Pannala (ORNL), Ramanan Sankaran (ORNL), and Aytekin Gel (Aeolus Research Inc.).

486

Cost-efficient staffing under annualized hours Egbert van der Veen1,2  

E-Print Network [OSTI]

. Our model is able to address various business questions regard- ing tactical workforce planning. In this paper we integrate two (tactical) workforce planning problems. The `annualized hours' problem workforce planning problems, as discussed in the previous para- graph. Second, with our model, several

Boucherie, Richard J.

487

Fee Name: Increase University Library Hours of Operation Measure #: Measure 42  

E-Print Network [OSTI]

a quiet, uninterrupted space for study. Greater access to the Library is a key component to the studentsFee Name: Increase University Library Hours of Operation Measure #: Measure 42 Ballot Information Shall the undergraduate and graduate students of UCSC provide funding for the University Library (Mc

California at Santa Cruz, University of

488

Graduation (research) project procedures -After the student completes 100 credit hours he may register for the  

E-Print Network [OSTI]

Graduation (research) project procedures - After the student completes 100 credit hours he may register for the graduation project module, and after registering this module and obtaining the approval of the adviser and registrar the procedures will begin according to the following: - 1) The student shall attend

489

SCHOOL OF MATHEMATICS AND STATISTICS Spring Semester 20072008 OPERATIONS RESEARCH 2 hours  

E-Print Network [OSTI]

four will be counted. 1 (i) A company owns a steam turbine power generating plant that generates its steam from coal. It wishes to maximise the steam output. This, however, may result in emission that does per hour. The plant receives two grades of pul- verised coal, C1 and C2, for use in the steam plant

490

BME BIOTECHNOLOGY CONCENTRATION F11 MS: 30 total credit hours minimum  

E-Print Network [OSTI]

BME BIOTECHNOLOGY CONCENTRATION ­ F11 MS: 30 total credit hours minimum Students last name begins: Michael Mayer, Ph.D. (mimayer@umich.edu) Biotechnology (one course): BIOMEDE 410 Design and Application of Engineering): At least one of the following: BIOLCHEM 515 Introductory Biochemistry (Biotechnology only)5 (3

Eustice, Ryan

491

BME BIOTECHNOLOGY CONCENTRATION F10 MS: 30 total credit hours minimum  

E-Print Network [OSTI]

BME BIOTECHNOLOGY CONCENTRATION ­ F10 MS: 30 total credit hours minimum Students last name begins: Michael Mayer, Ph.D. (mimayer@umich.edu) Biotechnology (one course): BIOMED E 410 Design and Application (Biotechnology only)5 (3) (I, II) BIOMED E 519 Quantitative Physiology (Tissue Engineering only)6 (4) (I) Other

Eustice, Ryan

492

BME BIOTECHNOLOGY CONCENTRATION F12 MS: 30 total credit hours minimum  

E-Print Network [OSTI]

BME BIOTECHNOLOGY CONCENTRATION ­ F12 MS: 30 total credit hours minimum Advisor: Michael Mayer, Ph.D. (mimayer@umich.edu) Biotechnology (one course): BIOMEDE 410 Design and Application of Biomaterials (3) (l)1 of Engineering): One course from this list: BIOLCHEM 515 Introductory Biochemistry (Biotechnology only)5 (3) (I

Kamat, Vineet R.

493

Chemistry 109 (3 credit hours) Honors General Chemistry Lecture, Part I; Fall 2014  

E-Print Network [OSTI]

of the book are available at the University Bookstore. Corequisite: CHE 129 ­ Honors General Chemistry introduce you to all areas of chemistry: physical, organic, inorganic, quantum, biophysical, and analyticalChemistry 109 (3 credit hours) Honors General Chemistry Lecture, Part I; Fall 2014 Instructor

Doyle, Robert

494

Impact of realistic hourly emissions profiles on air pollutants concentrations modelled with CHIMERE  

E-Print Network [OSTI]

Impact of realistic hourly emissions profiles on air pollutants concentrations modelled Keywords: Atmospheric composition European air quality Anthropogenic emissions a b s t r a c t Regional inputs data like anthropogenic surface emissions of NOx, VOCs and particulate matter. These emissions

Menut, Laurent

495

After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-Load Equipment  

E-Print Network [OSTI]

LBNL-53729 After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-Load To download this paper and related data go to: http://enduse.lbl.gov/Projects/OffEqpt.html The work described.................................................................................................................................................5 Office Equipment Data Collection

496

From the Big Bang to the Higgs Boson in Less Than an Hour  

E-Print Network [OSTI]

From the Big Bang to the Higgs Boson in Less Than an Hour Jeffrey D neutrino Z0 W + W -g gluon (8) photon Z boson W bosons Quarks Leptons H Higgs boson Gauge bosons (force field quanta) Higgs boson and vacuum expectation value Strong force EM force Weak force #12;Par7cles

Fygenson, Deborah Kuchnir

497

From the Big Bang to the Higgs Boson in Less Than an Hour  

E-Print Network [OSTI]

From the Big Bang to the Higgs Boson in Less Than an Hour Jeffrey D H Higgs boson Gauge bosons (force field quanta) Higgs boson and vacuum expectation value Strong) photon Z boson W bosons H Higgs boson Gauge bosons (force field quanta) Higgs boson and vacuum

Fygenson, Deborah Kuchnir

498

BME BIOMEDICAL IMAGING CONCENTRATION F12 MS: 30 total credit hours minimum  

E-Print Network [OSTI]

BME BIOMEDICAL IMAGING CONCENTRATION ­ F12 MS: 30 total credit hours minimum Advisor: Luis Hernandez-Garcia, Ph.D. (hernan@umich.edu) Biomedical Imaging: BIOMEDE 5161 Medical Imaging Systems (3) (I)2 General: BIOMEDE 500 Biomedical Engineering Seminar (1) (I,II) BIOMEDE 550 Ethics and Enterprise (1) (I

Kamat, Vineet R.

499

BME BIOMEDICAL IMAGING CONCENTRATION F11 MS: 30 total credit hours minimum  

E-Print Network [OSTI]

BME BIOMEDICAL IMAGING CONCENTRATION ­ F11 MS: 30 total credit hours minimum Advisor: Luis Hernandez-Garcia, Ph.D. (hernan@umich.edu) Biomedical Imaging: BIOMEDE 5161 Medical Imaging Systems (3) (I)2 General: BIOMEDE 500 Biomedical Engineering Seminar (1) (I,II) BIOMEDE 550 Ethics and Enterprise (1) (I

Eustice, Ryan

500

Seafood safety: Knowledge, attitudes, self-reported practices and risk perceptions of seafood workers  

Science Journals Connector (OSTI)

Abstract The aims of this study were to assess the knowledge, attitudes and self-reported practices regarding seafood safety and the risk perception of seafood-borne diseases among seafood workers and to study the relationships among these variables. This study was cross-sectional, and the data collection was conducted using questionnaires administered through face-to-face interviews with 193 seafood workers in Brazil. Of these workers, 49.8% handled fish on fishery boats (Fishery Workers, FWs) and 50.2% were seafood handlers in two seafood warehouses (Seafood Warehouse Workers, SWWs). A minority of the seafood workers (33.7%) had participated in at least one food-safety training session. The knowledge and attitudes scores of the \\{SWWs\\} were higher than the scores of the FWs. However, no difference was observed between the self-reported practice scores of the \\{SWWs\\} and FWs. The mean level of risk perception score of the \\{SWWs\\} was higher than that of the FWs; nevertheless, both groups were classified as having an average risk perception of seafood-borne diseases. The risk perception score was correlated with the knowledge and attitude scores in both groups. Multiple linear regression analysis showed that the attitude score and the age of the worker were related to the self-reported practice scores of both groups. These results showed the need for immediate actions to improve the knowledge, attitudes, and practices regarding food safety and handling to ensure the production of seafood that is safe for consumption.

Las Mariano Zanin; Diogo Thimoteo da Cunha; Elke Stedefeldt; Vanessa Dias Capriles

2015-01-01T23:59:59.000Z