Powered by Deep Web Technologies
Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Charts and graphs: NUKEM Uranium price ange data; NUKEM Uranium historical price graph; U.S. DOE & euratom average contract prices for natural uranium; NUKEM SWU historical price graph; NUKEM SWU spot/secondary price range; U.S. DOE separative work prices data  

SciTech Connect (OSTI)

This article is the uranium market data summary. It contains data for the following subjects: (1) March 1996 transactions, (2) Uranium price range data, (3) Historical uranium price range data, (4) DOE and Euratom average contract prices for natural uranium, (5) SWU historical price data, (6) SWU/spot/secondary price range data, and (7) DOE SWU prices data.

NONE

1996-04-01T23:59:59.000Z

2

Answers for Homework Handout for unit 4 Work and Energy  

E-Print Network [OSTI]

potential energy spinning top: (rotational) kinetic energy pot of hot water: thermal (kinetic) energy x-rays: electromagnetic energy (not really "storage" per se, however) 6. From the top to the bottom, the gymnast's centerAnswers for Homework Handout for unit 4 Work and Energy 1. Here we use W = F D = FD cos : a) W

Mansell, Edward "Ted"

3

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A Phase I RFI was completed at WIPP as part of a Voluntary Release Assessment (VRA). The risk-based decision criteria recommended by EPA for the VRA were contained in a proposed Corrective Action rule for SWMUs (EPA, 1990). EPA Region VI has issued new risk-based screening criteria applicable to the WIPP SWMUs and AOCs.

Washington TRU Solutions LLC

2000-02-25T23:59:59.000Z

4

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

Washington TRU Solutions LLC

2001-02-25T23:59:59.000Z

5

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-02-14T23:59:59.000Z

6

SAFETY COMMITTEE ANNUAL PLAN TEMPLATE The safety committee and the unit administration work together in promoting the unit's safety and  

E-Print Network [OSTI]

SAFETY COMMITTEE ANNUAL PLAN TEMPLATE The safety committee and the unit administration work together in promoting the unit's safety and health efforts. The Safety Committee Annual Plan provides. Supervisors can review the plan with new employees during their safety orientation. 3. Safety committee

Collins, Gary S.

7

Work Capacity, Thermal Responses and Lung Function: United Kingdom Studies in the I.B.P.  

Science Journals Connector (OSTI)

...1976 research-article Work Capacity, Thermal Responses and Lung Function: United Kingdom...and water, as shown by studies in the Sudan and Tanzania. Lung function of some seven...factors was examined. Work capacity, thermal responses and lung function: united kingdom...

1976-01-01T23:59:59.000Z

8

United States-Japan Nuclear Security Working Group Fact Sheet | National  

National Nuclear Security Administration (NNSA)

United States-Japan Nuclear Security Working Group Fact Sheet | National United States-Japan Nuclear Security Working Group Fact Sheet | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Fact Sheets > United States-Japan Nuclear Security Working Group Fact Sheet Fact Sheet United States-Japan Nuclear Security Working Group Fact Sheet Mar 27, 2012

9

Geology And A Working Conceptual Model Of The Obsidian Butte (Unit 6)  

Open Energy Info (EERE)

Geology And A Working Conceptual Model Of The Obsidian Butte (Unit 6) Geology And A Working Conceptual Model Of The Obsidian Butte (Unit 6) Sector Of The Salton Sea Geothermal Field, California Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Geology And A Working Conceptual Model Of The Obsidian Butte (Unit 6) Sector Of The Salton Sea Geothermal Field, California Details Activities (2) Areas (1) Regions (0) Abstract: A working conceptual model has been developed for the southwestern portion of the Salton Sea geothermal system, the region encompasing CalEnergy Operating Company's imnent 'Unit 6' field expansion (185 megawatts). The model is based on examination and analysis of several thousand borehole rock samples combined with a wealth of subsurface information made available for the first time from the databases of present

10

THE IMPACT OF WORK UNIT AND ORGANIZATION SUPPORT ON HOSPITAL PATIENT SAFETY  

E-Print Network [OSTI]

THE IMPACT OF WORK UNIT AND ORGANIZATION SUPPORT ON HOSPITAL PATIENT SAFETY By C2009 Carol Ann Kemper B.S.N., University of Cincinnati, 1980 M.S.N, Boston College, 1983 Submitted to the graduate degree program of the School of Nursing... the relationships between Organization Support (OS) and Work Unit Support (WS) on Hospital Patient Safety. OS and WS were operationalized using the National Database for Nursing Quality Indicators® (NDNQI®) RN Survey with Job Satisfaction Scales. Patient Safety...

Kemper, Carol Ann

2009-01-27T23:59:59.000Z

11

Smith Lever Act Cooperative extension work between the Land-Grant Colleges and the United State  

E-Print Network [OSTI]

Smith Lever Act Cooperative extension work between the Land-Grant Colleges and the United State Department of Agriculture is authorized by the Smith-Lever Act. The provisions of the Act, in effect in Oregon Oregon 4-H Program Handbook Smith Lever Act February 1995 The amount paid by the Federal

Tullos, Desiree

12

J-2 Work Permission Permission may be authorized by the United States Immigration & Customs Services  

E-Print Network [OSTI]

J-2 Work Permission Permission may be authorized by the United States Immigration & Customs: Will review and make any suggestions on the completed application. Recommends that you keep a copy (see attached). 6. White or off-white background. Printed on thin photo paper or stock 7. Photographs

Varela, Carlos

13

RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

Not Available

1993-06-01T23:59:59.000Z

14

Saving the soil: AgriLife units work to improve traning terrain  

E-Print Network [OSTI]

quality of supply reservoirs. The revegetation project began in 2003, and project members started evaluating the addition of composted dairy manure to primary training areas as a management practice. Compost enhances soil quality and promotes...Saving the soil AgriLife units work to improve training terrain Story by Melanie Orth txH2O | pg. 9 Heavy tanks and armored vehicles that have continually rolled over the 67,000-acre West Range at Fort Hood for the past 60 years have...

Orth, Melanie

2010-01-01T23:59:59.000Z

15

Saving the soil: AgriLife units work to improve training terrain  

E-Print Network [OSTI]

quality of supply reservoirs. The revegetation project began in 2003, and project members started evaluating the addition of composted dairy manure to primary training areas as a management practice. Compost enhances soil quality and promotes...Saving the soil AgriLife units work to improve training terrain Story by Melanie Orth txH2O | pg. 9 Heavy tanks and armored vehicles that have continually rolled over the 67,000-acre West Range at Fort Hood for the past 60 years have...

Orth, Melanie

2011-01-01T23:59:59.000Z

16

2013 Uranium Marketing Annual Report  

U.S. Energy Information Administration (EIA) Indexed Site

17. Purchases of enrichment services by owners and operators of U.S. civilian nuclear power reactors by contract type in delivery year, 2013" "thousand separative work units (SWU)"...

17

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

SciTech Connect (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

18

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

SciTech Connect (OSTI)

his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

19

Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

Not Available

1992-09-01T23:59:59.000Z

20

Transfer of radionuclides to animals: An historical perspective of work done in the United States  

SciTech Connect (OSTI)

This document describes historical aspects of the use of radionuclides in animals, particularly in the United States. (TEM)

Richmond, C.R.

1988-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

NONE

1995-10-01T23:59:59.000Z

22

Equality Advisor (Race, Religion and Belief) The Equality and Diversity Unit works in partnership with University bodies, academic  

E-Print Network [OSTI]

Equality Advisor (Race, Religion and Belief) The Equality and Diversity Unit works in partnership and cultural awareness. The Equality Advisor in this area also facilitates the Race Equality Network, for both staff and students. Equality Advisor for Race, Religion and Belief has responsibility for: · considering

Henderson, Gideon

23

Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

Not Available

1993-05-01T23:59:59.000Z

24

REMEDIAL ACTION WORK PLAN FOR THE MAYI'IOOD SITE JULY I9B4 UNITED...  

Office of Legacy Management (LM)

I9B4 UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS TABLE OF CONTENTS 1 . 0 I n t r o d u c t i o n a n d O b j e c t i v e s l . I B a c k g r o u n d L . 2 S i t e l d...

25

work  

Broader source: Energy.gov (indexed) [DOE]

THE THE U.S. DEPARTMENT OF ENERGY'S WORKING CAPITAL FUND U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES OCTOBER 1998 AUDIT REPORT CR-B-99-01 MEMORANDUM FOR THE DIRECTOR, BUSINESS MANAGEMENT STAFF FROM: William S. Maharay Acting Manager, Capital Regional Audit Office, Office of Inspector General SUBJECT: INFORMATION : Audit Report on the Department's Working Capital Fund BACKGROUND The Department established the Working Capital Fund (Fund) in January 1996 as a financial management tool for charging the costs of common services provided at Headquarters to Departmental program offices. The objectives in establishing the Fund were to increase efficiency of the Department's operations, improve management of administrative services

26

Technique of Calibration of a Working Standard of the Energy Unit of Narrow-Pulse Laser Radiation and Results of Trial Use of the Standard  

Science Journals Connector (OSTI)

Questions related to the design and testing of a technique of calibrating a working energy unit of narrow-pulse laser radiation by means of an electrical working system and determining the degree of equivalenc...

I. V. Mnev; M. V. Ulanovskii

2002-06-01T23:59:59.000Z

27

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III  

SciTech Connect (OSTI)

The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

R. P. Wells

2006-09-19T23:59:59.000Z

28

ÂŤThis report was prepared as an account of work sponsored by an agency of the United States Government  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Produced Water with Density and Conductivity Produced Water with Density and Conductivity Meters Final Report February 17, 2003 May 16, 2004 Jason T. Smith August 2004 DE-FG26-03NT15434 Team Energy RR1 Box 197 Bridgeport, IL 62417 1 DISCLAIMER "This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not

29

Operable Unit 7-13/14 in situ thermal desorption treatability study work plan  

SciTech Connect (OSTI)

This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.

Shaw, P.; Nickelson, D.; Hyde, R.

1999-05-01T23:59:59.000Z

30

Specific features of the schematic solutions adopted in the steam turbine units produced by the Ural Turbine Works and used as part of combined-cycle plants  

Science Journals Connector (OSTI)

Specific features of the schematic solutions adopted in the steam turbine units designed and produced by the Ural Turbine Works for use as part of combined-cycle plants are considered.

A. A. Gol’dberg; T. L. Shibaev; H. C. Paneque Aguilera…

2013-08-01T23:59:59.000Z

31

New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect (OSTI)

This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Nelson, L. O.

2007-06-12T23:59:59.000Z

32

Testimony to the United States Senate Committee on Environment and Public Works Legislative Hearing on America's Climate Security Act of 2007  

E-Print Network [OSTI]

Testimony to the United States Senate Committee on Environment and Public Works Legislative Hearing Fellow Engineering Science and Technology Division Oak Ridge National Laboratory Good afternoon. Thank sector was responsible for 28% of total U.S. greenhouse gas emissions in 2005 (USEPA, 2007a, table 2

33

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan  

SciTech Connect (OSTI)

This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

D. E. Shanklin

2006-06-01T23:59:59.000Z

34

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect (OSTI)

This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

D. Vandel

2003-09-01T23:59:59.000Z

35

Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater Remedial Design/Remedial Action Scope of Work  

SciTech Connect (OSTI)

This Remedial Design/Remedial Action (RD/RA) Scope of Work pertains to OU 3-14 Idaho Nuclear Technology and Engineering Center and the Idaho National Laboratory and identifies the remediation strategy, project scope, schedule, and budget that implement the tank farm soil and groundwater remediation, in accordance with the May 2007 Record of Decision. Specifically, this RD/RA Scope of Work identifies and defines the remedial action approach and the plan for preparing the remedial design documents.

D. E. Shanklin

2007-07-25T23:59:59.000Z

36

Statement of Work for Direct Push Technology Characterization Borehole Installations During Fiscal Year 2006, 300-FF-5 Operable Unit  

SciTech Connect (OSTI)

This document specifies activities to be performed by FHI to fulfill Part II of the 300-FF-5 Operable Unit Limited Field Investigation. The scope includes driving up to 15 direct push technology boreholes to the water table for radiological geophysical logging of the vadose zone to define the vertical extent and concentration of process uranium waste in the subsurface. Drilling and sampling field activates will follow FHI waste management, risk assessment and QA process and procedures. The sampling and analysis of information recovered during this characterization will meet the Hanford Performance Assessment Project QAAP requirements.

Williams, Bruce A.

2005-11-29T23:59:59.000Z

37

Analysis of the working process and mechanical losses in a Stirling engine for a solar power unit  

SciTech Connect (OSTI)

In this paper a second level mathematical model for the computational simulation of the working process of a 1-kW Stirling engine has been used and the results obtained are presented. The internal circuit of the engine in the calculation scheme was divided into five chambers, namely, the expansion space, heater, regenerator, cooler and the compression space, and the governing system of ordinary differential equations for the energy and mass conservation were solved in each chamber by Euler`s method. In addition, mechanical losses in the construction of the engine have been determined and the computational results show that the mechanical losses for this particular design of the Stirling engine may be up to 50% of the indicated power of the engine.

Makhkamov, K.K. [Uzbek Academy of Sciences, Tashkent (Uzbekistan). Physical and Technical Inst.; Ingham, D.B. [Univ. of Leeds (United Kingdom). Dept. of Applied Mathematics

1999-05-01T23:59:59.000Z

38

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV  

SciTech Connect (OSTI)

This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

R. P. Wells

2006-11-14T23:59:59.000Z

39

Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the nature and extent of contamination is presented in Section 1.2, and the results of the BRA are summarized in Section 1.3. The objective of this FS is discussed in Section 1.4, and preliminary remediation goals are identified in Section 1.5. The organization of the remaining chapters of this FS is outlined in Section 1.6.

NONE

1999-07-15T23:59:59.000Z

40

Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.

NONE

1999-07-15T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Industrial Sites Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (including Record of Technical Change Nos. 1, 2, 3, and 4)  

SciTech Connect (OSTI)

This Leachfield Corrective Action Units (CAUs) Work Plan has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the U.S. Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the U.S. Department of Defense (FFACO, 1996). Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. A work plan may be developed that can be referenced by leachfield Corrective Action Investigation Plans (CAIPs) to eliminate redundant CAU documentation. This Work Plan includes FFACO-required management, technical, quality assurance (QA), health and safety, public involvement, field sampling, and waste management documentation common to several CAUs with similar site histories and characteristics, namely the leachfield systems at the Nevada Test Site (NTS) and the Tonopah Test Range (TT R). For each CAU, a CAIP will be prepared to present detailed, site-specific information regarding contaminants of potential concern (COPCs), sampling locations, and investigation methods.

DOE/NV

1998-12-18T23:59:59.000Z

42

Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory  

SciTech Connect (OSTI)

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

1993-07-01T23:59:59.000Z

43

Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste fadities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCIA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RIFA)/RCRA Facility Investigation (RFI)/Coffective Measures Study (CMS)/Corrective Measures Implementation process. Under CERCLA, the actions follow the Pre@ary Assessment/Site Investigation (PA/Sl) Remedial Investigation Feasibility Study (RI/FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCIA into an RI Work Plan for the lint phase of characterization of Bear Creek Valley (BCV) Operable Unit (OU) 4.

Not Available

1992-12-01T23:59:59.000Z

44

Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

Not Available

1993-09-01T23:59:59.000Z

45

Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect (OSTI)

Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

Not Available

1993-08-01T23:59:59.000Z

46

Streamlined Approach for Environmental Restoration Work Plan for Corrective Action Unit 461: Joint Test Assembly Sites and Corrective Action Unit 495: Unconfirmed Joint Test Assembly Sites Tonopah Test Range, Nevada  

SciTech Connect (OSTI)

This Streamlined Approach for Environmental Restoration plan addresses the action necessary for the clean closure of Corrective Action Unit 461 (Test Area Joint Test Assembly Sites) and Corrective Action Unit 495 (Unconfirmed Joint Test Assembly Sites). The Corrective Action Units are located at the Tonopah Test Range in south central Nevada. Closure for these sites will be completed by excavating and evaluating the condition of each artillery round (if found); detonating the rounds (if necessary); excavating the impacted soil and debris; collecting verification samples; backfilling the excavations; disposing of the impacted soil and debris at an approved low-level waste repository at the Nevada Test Site

Jeff Smith

1998-08-01T23:59:59.000Z

47

United States  

Office of Legacy Management (LM)

- I - I United States Department of Energy D lSCk Al M E R "This book was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency

48

Technology Survey to Support Revision to the Remedial Investigation/Feasibility Study Work Plan for the 200­-SW­-2 Operable Unit at the U.S. Department of Energy’s Hanford Site  

SciTech Connect (OSTI)

A survey of technologies was conducted to provide information for a Data Quality Objectives process being conducted to support revision of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit. The technology survey considered remediation and characterization technologies. This effort was conducted to address, in part, comments on the previous version of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit as documented in 200­SW­1 and 200­SW­2 Collaborative Workshops?Agreement, Completion Matrix, and Supporting Documentation. By providing a thorough survey of remediation and characterization options, this report is intended to enable the subsequent data quality objectives and work plan revision processes to consider the full range of potential alternatives for planning of the Remedial Investigation/Feasibility Study activities.

Truex, Michael J.; Johnson, Christian D.; Nimmons, Michael J.

2007-09-25T23:59:59.000Z

49

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

50

Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This document outlines the activities necessary to conduct a Remedial Investigation (RI) of the Chestnut Ridge Security Pits (CRSP) at the Oak Ridge Y-12 Plant. The CRSP, also designated Chestnut Ridge Operable Unit (OU) 1, is one of four OUs along Chestnut Ridge on the Oak Ridge Reservation (ORR). The purpose of the RI is to collect data to (1) evaluate the nature and extent of known and suspected contaminants, (2) support an Ecological Risk Assessment (ERA) and a Human Health Risk Assessment (HHRA), (3) support the feasibility study in the development and analysis of remedial alternatives, and (4) ultimately, develop a Record of Decision (ROD) for the site. This chapter summarizes the regulatory background of environmental investigation on the ORR and the approach currently being followed and provides an overview of the RI to be conducted at the CRSP. Subsequent chapters provide details on site history, sampling activities, procedures and methods, quality assurance (QA), health and safety, and waste management related to the RI.

Not Available

1994-03-01T23:59:59.000Z

51

Uranium Marketing Annual Report - Release Date: May 31, 2011  

Gasoline and Diesel Fuel Update (EIA)

6. Purchases of enrichment services by owners and operators of U.S. civilian nuclear power reactors by origin country and year, 2008-2012 6. Purchases of enrichment services by owners and operators of U.S. civilian nuclear power reactors by origin country and year, 2008-2012 thousand separative work units (SWU) Country of Enrichment Service (SWU-origin) 2008 2009 2010 2011 2012 China 0 0 0 W W France 556 895 W W 0 Germany 468 1,059 681 1,539 1,075 Netherlands 1,038 1,345 2,292 1,506 1,496 Russia 4,793 5,478 5,055 5,308 6,560 United Kingdom 2,195 2,940 2,119 2,813 2,648 Europe1 W W W 670 W Other 2 W W W 0 W Foreign Total 10,709 13,115 11,526 12,395 12,330 United States 1,890 4,102 2,251 2,434 3,261 Total 12,599 17,217 13,776 14,829 15,590 Average Price (US$ per SWU) 121.33 130.78 136.14 136.12 141.36 1 Specific country in Europe was not reported.

52

Quantification of the Potential Impact on Commercial Markets of  

Broader source: Energy.gov (indexed) [DOE]

Introduction of the Enrichment Services Component of DOE Low Enriched Introduction of the Enrichment Services Component of DOE Low Enriched Uranium Inventory During Calendar Year 2013 Quantification of the Potential Impact on Commercial Markets of Introduction of the Enrichment Services Component of DOE Low Enriched Uranium Inventory During Calendar Year 2013 This report presents the results of a business analysis performed by Energy Resources International, Inc. (ERI) of the potential impact on the commercial enrichment market of the transfer of the enrichment services component (Separative Work Units or SWU) contained in DOE low enriched uranium (LEU) inventory during 2013. Under this transaction, 299,000 kg SWU would be introduced into the commercial market, but no transfer of natural uranium to the commercial market would take place.

53

United States Atomic Energy Commission formed  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

formed As the United Nations Atomic Energy Commission failed to come to grips with the growing nuclear weapons problem, the United States worked to establish its own formal...

54

API unit  

Science Journals Connector (OSTI)

API unit [An arbitrary unit of the American Petroleum Institute for measuring natural radioactivity; used in certain well logging methods] ? API-Einheit f

2014-08-01T23:59:59.000Z

55

STATEMENT OF WORK  

National Nuclear Security Administration (NNSA)

PART III - SECTION J APPENDIX B STATEMENT OF WORK Table of Contents 1.0 General.................................................................................................................... 273 2.0 Laboratory Mission and Scope of Work. ................................................................ 274 3.0 Science & Technology. ........................................................................................... 275 3.1 Defense Programs. .................................................................................................. 276 3.1.1 Stewardship of United States Nuclear Weapons. ................................................ 276 3.1.1.1 Stockpile Certification. .......................................................................................

56

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

193 UNIT NUMBER: 197 UNIT NAME: CONCRETE RUBBLE PILE (30) REGULATORY STATUS: AOC LOCATION: Outside plant security fence, north of the plant on Big Bayou Creek on private property....

57

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 UNIT NUMBER UNIT NAME Rubble oile 41 REGULATORY STATUS: AOC LOCATION: Butler Lake Dam, West end of Butler Lake top 20 ft wide, 10 ft APPROXIMATE DIMENSIONS: 200 ft long, base 30...

58

Uncertainty clouds uranium enrichment corporation's plans  

SciTech Connect (OSTI)

An expected windfall to the US Treasury from the sale of the Energy Dept.'s commercial fuel enrichment facilities may evaporate in the next few weeks when the Clinton administration submits its fiscal 1994 budget proposal to Congress, according to congressional and administration officials. Under the Energy Policy Act of 1992, DOE is required to lease two uranium enrichment facilities, Portsmouth, Ohio, and Paducah, KY., to the government-owned US Enrichment Corp. (USEC) by July 1. Estimates by OMB and Treasury indicate a potential yearly payoff of $300 million from the government-owned company's sale of fuel for commercial reactors. Those two facilities use a process of gaseous diffusion to enrich uranium to about 3 percent for use as fuel in commercial power plants. DOE has contracts through at least 1996 to provide about 12 million separative work units (SWUs) yearly to US utilities and others world-wide. But under an agreement signed between the US and Russia last August, at least 10 metric tons, or 1.5 million SWUs, of low-enriched uranium (LEU) blended down from Russia warheads is expected to be delivered to the US starting in 1994. It could be sold at $50 to $60 per SWU, far below what DOE currently charges for its SWUs - $135 per SWU for 70 percent of the contract price and $90 per SWU for the remaining 30 percent.

Lane, E.

1993-03-24T23:59:59.000Z

59

Fermilab: Science at Work  

ScienceCinema (OSTI)

Six days. Three frontiers. One amazing lab. From 2010 to 2012, a film crew followed a group of scientists at the Department of Energy's Fermilab and filmed them at work and at home. This 40-minute documentary shows the diversity of the people, research and work at Fermilab. Viewers catch a true behind-the-scenes look of the United States' premier particle physics laboratory while scientists explain why their research is important to them and the world.

Brendan Casey; Herman White; Craig Hogan; Denton Morris; Mary Convery; Bonnie Fleming; Deborah Harris; Dave Schmitz; Brenna Flaugher; Aron Soha

2013-02-14T23:59:59.000Z

60

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

174 10 12 92 UNIT NAME: C-745-K Low Level Storage Area REGULATORY STAU: -AOC LOCATION: Inside Security Fence , South of C-333 Cascade Building. APPROXIMATE...

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 UNIT NAME C-611 Underaround Diesel Tank REGULATORY STATUS: AOC LOCATION: Immediately southeast of C-611 APPROXIMATE DIMENSIONS: 1000 gallon FUNCTION: Diesel storage OPERATIONAL...

62

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 KOW Toluene SDill Area UNIT NAME: REGULATORY STATUS: AOC LOCATION: Southwest of plant site APPROXIMATE DIMENSIONS: 200 feet wide by 800 feet ong FUNCTION: Storage of Toluene...

63

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 UNIT NAME C-746-Al REGULATORY STATUS: AOC LOCATION: Northwest corner of C-746-A APPROXIMATE DIMENSIONS: 4000 gallons FUNCTION: Underground storage tanks OPERATIONAL STATUS:...

64

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 UNIT NAME C-611 Underaround Gasoline Tank REGULATORY STATUS: AOC LOCATION: Immediately east of C-61l APPROXIMATE DIMENSIONS: 50 ga on FUNCTION: Gasoline storage OPERATIONAL...

65

United States of Agriculture  

E-Print Network [OSTI]

in wildlife management from the University of New Hampshire in 1988. She joined the Intermountain Research Station in 1993 after working for the States of New Hampshire and Wyoming on projects involving wetlandUnited States Department of Agriculture Forest Service Intermountain Research Station General

66

UNIT SPECIFIC PLAN FORM INVESTIGATOR INFORMATION  

E-Print Network [OSTI]

performed in your work area. This information is requested to help EHS review your Unit Specific Plan Form or stored in your work areas, a" Standard Operating Procedure" (SOP), Appendix A of the Unit Specific Plan1 UNIT SPECIFIC PLAN FORM INVESTIGATOR INFORMATION Principal Investigator: E-Mail: Department

Maroncelli, Mark

67

INL's '@work' Scientific Glassblower  

SciTech Connect (OSTI)

INL's '@work' segments feature INL employees and the jobs they perform. This edition features INL's Russell Lewis, a skilled glassblower. Learn more at http://www.facebook.com/idahonationallaboratory. Prepared by Battelle Energy Alliance, LLC under Contract NO.DE-AC07-05ID14517 with the U.S. Department of Energy. The United States Government retains a nonexclusive paid-up, irrevocable, world-wide license to publish or reproduce this video, or allow others to do so, for United States Government Purposes.

Lewis, Russel

2008-01-01T23:59:59.000Z

68

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 UNIT NAME C-333 North Side PCB Soil Contamination REGULATORY STATUS: AOC LOCATION: North side of C-333 Building APPROXIMATE OIMENSIONS: 150 ft by 100 ft FUNCTION: Dust Palliative...

69

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 KPDES Outfall Ditch 017 Flume- Soil Backfill UNIT NAME: - REGULATORY STATUS: AOC LOCATION: South of plant on the west side of the access road APPROXIMATE DIMENSIONS: 30 feet wide...

70

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 C-617-A Sanitarv Waterline- Soil Backfill UNIT NAME: - REGULATORY STATUS: AOC LOCATION: Between southeast corner of C-531 Switchyard and C-617-A Water Treatment Facility. 4 feet...

71

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 UNIT NAME C-720 Inactive TCE Oegreaser REGULATORY STATUS: AOC LOCATION: C-720 Building APPROXIMATE DIMENSIONS: Approx. 10 ft by 10 ft by 20 f1: deep FUNCTION: Used for cleaning...

72

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 UNIT NAME Rubble Dile 46 REGULATORY STATUS: AOC LOCATION: 2000 ft southwest of curve on Kentucky Highway 473- near east end of Mitchell Lake APPROXIMATE DIMENSIONS: About 100 ft...

73

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 UNIT NAME Rubble oile 45 REGULATORY STATUS AOC LOCATION: West end of Mitche Lake APPROXIMATE DIMENSIONS: 2000 ft long, ft thick 4 ft wide FUNCTION: Control erosion on face of dam...

74

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 UNIT NAME Rubble Dile 43 REGULATORY STATUS: AOC LOCATION: West end of Happy Ho ow Lake APPROXIMATE DIMENSIONS: 200 ft long by 4 ft wide -concrete 4-6 in thickness FUNCTION:...

75

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 UNIT NAME C-740 TCE Soill Site REGULATORY STATUS: AOC LOCATION: Northwest corner C-740 concrete pad area) APPROXIMATE DIMENSIONS: 5 ft by 5 ft spill FUNCTION: Drum storage area...

76

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 C-I00 South Side Berms UNIT NAME REGULATORY STATUS: AOC LOCATION: South Side C-IOO APPROXIMATE DIMENSIONS: 2 berms approximately 200 ft long by SO ft wide eac FUNCTION:...

77

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 UNIT NAME: C-331 PCB Soil Contamination -West Side REGULATORY STATUS: AOC LOCATION: West side C-331 building APPROXIMATE DIMENSIONS: 100 feet wide by 420 feet long FUNCTION: Dust...

78

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 C-750B Diesel UST UNIT NAME REGULATORY STATUS: AOC LOCATION: Southeast corner of C-750 APPROXIMATE DIMENSIONS: 10,000 gallon FUNCTION: Diesel storage OPERATIONAL STATUS: Removed...

79

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 UNIT NAME C-633 PCB So111 Site REGULATORY STATUS CERCLA LOCATION C-633 Transformer area (Mac location 75) APPROXIMATE DIMENSIONS I Unknown FUNCTION Soill site OPERATIONAL STATUS...

80

PLANNING UNIT October 26, 2009  

E-Print Network [OSTI]

PLANNING UNIT October 26, 2009 Advertisement for TRIPP Chair in the Institute A large number research work in the area of Transportation Planning for control of accidents and pollution with special

Prasad, Sanjiva

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

United States  

Office of Legacy Management (LM)

Office of Research and EPA 600/R-941209 Environmental Protection Development January 1993 Agency Washington, DC 20460 Offsite Environmental 57,,7 Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1992 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY OFFICE OF RESEARCH AND DEVELOPMENT ENVIRONMENTAL MONITORING SYSTEMS LABORATORY-LAS VEGAS P.O. BOX 93478 LAS VEGAS. NEVADA 891 93-3478 702/798-2100 Dear Reader: Since 1954, the U.S. Environmental Protection Agency (EPA) and its predecessor the U.S, Public Health Service (PHs) has conducted radiological monitoring in the offsite areas around United States nuclear test areas. The primary objective of this monitoring has been the protection of the health and safety of

82

United States  

Broader source: Energy.gov (indexed) [DOE]

BP Energy Company BP Energy Company OE Docket No. EA- 3 14 Order Authorizing Electricity Exports to Mexico Order No. EA-3 14 February 22,2007 BP Energy Company Order No. EA-314 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(Q of the Department of Energy Organization Act (42 U.S.C. 7 15 l(b), 7172(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.S24a(e)) . On May 22,2006, BP Energy Company (BP Energy) applied to DOE for an authorization to transmit electric energy from the United States to Mexico as a power marketer. BP Energy proposes to purchase surplus electric energy from electric utilities and other suppliers within the United States and to export that energy to ~Mexico. The cnergy

83

Second United Nations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nations Nations . DISCLAIMER This report was prepared a s an account of work sponsored by an agency of the United States Government. Neither t h e United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and

84

Going To Work: Work Relationships  

E-Print Network [OSTI]

One of a worker's top goals should be to develop good relationships with coworkers and supervisers. This publication discusses five general rules for building good relationships at work and offers advice on handling criticism....

Hoffman, Rosemarie

2000-07-20T23:59:59.000Z

85

United States  

Office of Legacy Management (LM)

WASHINGTON, TUESDAY, JUNE 28, 1983 @nngmeional Ruord United States of America .__ -- . . ,- PROCEEDINGS AND DEBATES OF THE 9@ CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmgton, D C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $xX Congresstonal Record (USPS 087-390) Postage and Fees Pad U S Government Prlnhng 0ffv.X 375 SECOND CLASS NEWSPAPER H.4578 ' C.QNGRESSIONAL RECORD - HOUSE June 28, 1983 H.J. Res. 273: Mr. BOUND. Mr. W~.XMAN. Mr. OBERSTAR, Mr. BEDELL. Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB, Mr. CONTE. Mr. RAHALL; Mr. GRAY, Mr. VANDER JACT. Mr. TRAKLER, and Mr. Vxrrro. H. Con. Res. 107: Mr. KASICH. Mr. AUCOIN. Mr. CARPER, and Mr. SIZHFIJER. H. Con. Res. 118: Mr. FISH. Mr. LANTOS.

86

United States  

Office of Legacy Management (LM)

ongrees;ional Record ongrees;ional Record United States of America __._ -.. I. :- PROCEEDINGS AND DEBATES OF THE 9tth CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmcqton. Cl C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $300 Congressmal Record (USPS 087-390) Postage and Fees Pad U S Governme3n:jPnntmg OfIce SECOND CLASS NEWSPAPER H.4578 ' June 28, 1983 -: I H.J. Res. 273: Mr. BOLAND, Mr. WA-. Mr. OBERSTAFC, M' r. BEDELL, Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB. Mr. CONTE. Mr. RAHALL,. Mr. GRAY, Mr. VANDER JAGT. Mr. TRAKLER. and Mr. VENTO. H. Con. Res. iO7: Mr. KASICH. Mr. ALCOIN. Mr. CARPER. and Mr. SCHEUER. H. Con. Res. 118: Mr. FISH, Mr. LANTOS. Mr. KILDEE. Mr. SOLARZ Mr. Bmrr, Mr. BELWLL, Mr. RANG~L, Mr. DYMALLY. Mr.

87

United States  

Broader source: Energy.gov (indexed) [DOE]

E-T Global Energy, LLC E-T Global Energy, LLC OE Docket No. EA-381 Order Authorizing Electricity Exports to Mexico Order No. EA-381 June 10, 2011 I. BACKGROUND E-T Global Energy, LLC Order No. EA-381 Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department ofEnergy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) ofthe Federal Power Act (FPA) (16 U.S.C.824a(e)) 1 * On May 10,2011, DOE received an application from E-T Global Energy, LLC (E-T Global) for authority to transmit electric energy from the United States to Mexico for five years as a power marketer using existing international transmission facilities. E-

88

Working Copy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 Effective Date: 11/05/13 WP 12-IS.01-6 Revision 10 Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls Cognizant Section: Industrial Safety/Industrial Hygiene Approved By: Tom Ferguson Working Copy Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls WP 12-IS.01-6, Rev. 10 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 7 ACRONYMS AND ABBREVIATIONS ............................................................................. 8 1.0 INTRODUCTION 1 ............................................................................................... 10 2.0 VISITORS ........................................................................................................... 11

89

Working Copy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE/WIPP-99-2286 Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan Revision 7 U.S. Department of Energy December 2013 This document supersedes DOE/WIPP-99-2286, Rev. 6. Working Copy Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan DOE/WIPP-99-2286, Rev. 7 2 TABLE OF CONTENTSCHANGE HISTORY SUMMARY .............................................. 3 ACRONYMS AND ABBREVIATIONS ............................................................................ 4 1.0 INTRODUCTION .................................................................................................. 6 2.0 NOTIFICATION OR REPORTING REQUIREMENTS AND COMMITMENTS ..... 7

90

United States  

Broader source: Energy.gov (indexed) [DOE]

5 5 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CC-1-I Availability: This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

91

Work Address:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BO SAULSBURY BO SAULSBURY Work Address: Home Address: Oak Ridge National Laboratory 12952 Buckley Road National Transportation Research Center Knoxville, TN 37934 Building NTRC-2, Room 118 (865) 288-0750 Oak Ridge, TN 37831-6479 (865) 574-4694 saulsburyjw@ornl.gov Technical Specialties: Land use planning Environmental and socioeconomic impact assessment National Environmental Policy Act (NEPA) project management Vehicle fuel economy Education: 1986 B. A., History (minors in English and Business), The University of Tennessee 1989 M. S., Planning, The University of Tennessee (Thesis title: Land Use Compatibility Planning for Airfield Environs: Intergovernmental Cooperation to Protect Land Users From the Effects of Aircraft Operations)

92

United States  

Broader source: Energy.gov (indexed) [DOE]

TexMex Energy, LLC TexMex Energy, LLC OE Docket No. EA-294-A Order Authorizing Electricity Exports to Mexico Order No. EA-294-A February 22, 2007 TexMex Energy, LLC Order No. EA-294-A I. BACKGROUND Exports of electricity from the United States to a foreign count~y are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7 15 1 (b), 71 72(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.824a(e)) . On August 25,2004, DOE issued Order No. EA-294 authorizing TexMex Energy LLC (TexMex) to transmit electric energy fiom the United States to Mexico as a power marketer. That authority expired on August 25, 2006. On September 8, 2006, TexMex applied to renew the electricity export authority

93

United States  

Gasoline and Diesel Fuel Update (EIA)

United States United States Coal ................................................ 4,367 4,077 4,747 4,181 4,473 4,125 4,983 4,330 4,414 4,003 4,796 4,178 4,344 4,479 4,348 Natural Gas .................................... 2,802 2,843 3,694 2,863 2,713 2,880 3,636 2,707 2,792 2,972 3,815 2,849 3,052 2,986 3,109 Petroleum (a) .................................. 74 73 81 67 73 70 75 66 75 70 76 66 74 71 71 Other Gases ................................... 32 33 36 32 32 34 37 33 33 35 39 34 33 34 35 Nuclear ........................................... 2,176 2,044 2,257 2,170 2,106 2,037 2,167 2,010 2,144 2,074 2,206 2,055 2,162 2,080 2,120 Renewable Energy Sources: Conventional Hydropower ........... 736 886 716 633 765 887 708 646 767 919 729 659 742 751 768 Wind ............................................ 491 520 353 449 477 521 379 475

94

United States  

Broader source: Energy.gov (indexed) [DOE]

Tenaslta Power Services Co. Tenaslta Power Services Co. OE Docket No. EA-243-A Order Authorizing Electricity Exports to Canada Order No. EA-243-A March 1,2007 Tenaska Power Services Co. Order No. EA-243-A I. BACKGROUND Exports of elcctricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 30 I(b) and 402(f) of the Departrncnt of' Energy Organizatio~l Act (42 U, S.C. 7 15 1 (b), 7 1 72Cf)) and rcquirc authorization under section 202(e) of the Federal Power Act (FPA) ( Z 6 U. s.c.824a(e)j1. On August 16,2001, DOE issued Order No. EA-243 authorizing Tenaska Power Scrvices Co. (Tenaska) to transmit electric cncrgy from the United States to Canada as a power marketer. That authority expired on August 16,2003. On August 14,2006, Teilaska applied to renew the electricity export authority

95

United States  

Broader source: Energy.gov (indexed) [DOE]

7 7 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTV-1-H Availability: This rate schedule shall be available to the Tennessee Valley Authority (hereinafter called TVA). Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and TVA. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a frequency of approximately 60 hertz at the outgoing terminals of the Cumberland

96

United States  

Broader source: Energy.gov (indexed) [DOE]

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTVI-1-A Availability: This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and the Customer. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

97

UNITED STATES  

Office of Legacy Management (LM)

f).~<~~ \--\c :y-,ai F p"- KG f).~<~~ \--\c :y-,ai F p"- KG WASHINOTDN 28.0. C. ' -lr ' \ ' ' --- ".I ?--" ' z I. .~;-4.' J frr*o& 2 ii, - - -4 70-147 LRL:JCD JAN !! 8 1958 Oregon Metallurgical Corporation P. 0. Box 484 Albany, Oregon Attention: Mr. Stephen M. Shelton General Manager Gentlemen: Enclosed is Special Nuclear Material License No. SNM-144, as amended. Very 33uly yours, r:; I,;, ll)~gQ""d".- Lyall Johnson Chief, Licensing Branch Division of Licensing & Regulation Enclosure: SNM-144, as amended Distribution: bRO0 Attn: Dr. H.M.Roth DFMusser NMM MMMann INS JCRyan FIN (2) HSteele LRL SRGustavson LRL Document room Formal file Suppl. file Br & Div rf's ' .b liwwArry s/VW- ' q+ ' yj/ 2; 2-' , COP' 1 J JAM01958 -- UNITED STATES ATOMIC ENERGY COMMISSION

98

United States  

Broader source: Energy.gov (indexed) [DOE]

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule JW-2-F Availability: This rate schedule shall be available to the Florida Power Corporation (or Progress Energy Florida, hereinafter called the Company). Applicability: This rate schedule shall be applicable to electric energy generated at the Jim Woodruff Project (hereinafter called the Project) and sold to the Company in wholesale quantities. Points of Delivery: Power sold to the Company by the Government will be delivered at the connection of the Company's transmission system with the Project bus. Character of Service: Electric power delivered to the Company will be three-phase alternating current at a nominal frequency of 60 cycles per second.

99

United States  

Broader source: Energy.gov (indexed) [DOE]

Bangor Hydro-Electric Company Bangor Hydro-Electric Company OE Docket No. PP-89-1 Amendment to Presidential Permit Order No. PP-89-1 December 30,2005 PRESIDENTIAL PERMIT AMENDMENT Bangor Hydro-Electric Company Order No. PP-89-1 I. BACKGROUND The Department of Energy (DOE) has responsibility for implementing Executive Order (E.O.) 10485, as amended by E.O. 12038, which requires the issuance of a Presidential permit by DOE before electric trans~nission facilities may be constructed, operated, maintained, or connected at the borders of the United States. DOE may issue such a permit if it determines that the permit is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. On December 16, 1988, Bangor Hydro-Electric Company (BHE) applied to DOE

100

Decommissioning Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

Sanford, P. C.; Stevens, J. L.; Brandt, R.

2002-02-26T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Termination unit  

DOE Patents [OSTI]

This invention relates to a termination unit comprising an end-section of a cable. The end section of the cable defines a central longitudinal axis and comprising end-parts of N electrical phases, an end-part of a neutral conductor and a surrounding thermally insulation envelope adapted to comprising a cooling fluid. The end-parts of the N electrical phases and the end-part of the neutral conductor each comprising at least one electrical conductor and being arranged in the cable concentrically around a core former with a phase 1 located relatively innermost, and phase N relatively outermost in the cable, phase N being surrounded by the neutral conductor, electrical insulation being arrange between neighboring electrical phases and between phase N and the neutral conductor, and wherein the end-parts of the neutral conductor and the electrical phases each comprise a contacting surface electrically connected to at least one branch current lead to provide an electrical connection: The contacting surfaces each having a longitudinal extension, and being located sequentially along the longitudinal extension of the end-section of the cable. The branch current leads being individually insulated from said thermally insulation envelope by individual electrical insulators.

Traeholt, Chresten [Frederiksberg, DK; Willen, Dag [Klagshamn, SE; Roden, Mark [Newnan, GA; Tolbert, Jerry C [Carrollton, GA; Lindsay, David [Carrollton, GA; Fisher, Paul W [Heiskell, TN; Nielsen, Carsten Thidemann [Jaegerspris, DK

2014-01-07T23:59:59.000Z

102

Working Paper 6 October 2007  

E-Print Network [OSTI]

and innovation. Its constituent centres include the Research Centre for Social Sciences (RCSS), the ESRC Centre for Social and Economic Research on Innovation in Genomics (Innogen), the Science Studies Unit (SSU in innovation work Nils Markusson Abstract The literature on environmental champions tends to emphasise

103

United States Government  

Office of Legacy Management (LM)

D;F&g,8 C-r-I 3-3 D;F&g,8 C-r-I 3-3 .*. United States Government . memorandum DATE: JUNZO 1994 -... REPLY TO A?TN OF: EM-421 (W. A. Williams, 903-8149) Authority Determination -- Combustion Engineering Site, Windsor, SUBJECT: Connecticut To' The File The attached review, documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the Combustion Engineering (CE) Site in Windsor, Connecticut, under the Formerly Utilized Sites Remedial Action Program. CE was a prime contractor for the Atomic Energy Commission (AEC) and performed high-enriched uranium fuel fabrication work from 1955 to 1967. The services furnished at the CE site included some experimental work; however, it primarily consisted of fabrication of high-enriched uranium

104

Energy & Society Energy Units and Fundamentals Energy Units and Fundamentals of  

E-Print Network [OSTI]

Energy & Society Energy Units and Fundamentals 1 Toolkit 1: Energy Units and Fundamentals of Quantitative Analysis #12;Energy & Society Energy Units and Fundamentals 2 Table of Contents 1. Key Concepts: Force, Work, Energy & Power 3 2. Orders of Magnitude & Scientific Notation 6 2.1. Orders

Kammen, Daniel M.

105

How Minds Work Working & Episodic Memory  

E-Print Network [OSTI]

1 How Minds Work Working & Episodic Memory Stan Franklin Computer Science Division & Institute for Intelligent Systems The University of Memphis #12;HMW: Working and Episodic Memory 2 Memory Systems #12;HMW: Working and Episodic Memory 3 #12;HMW: Working and Episodic Memory 4 Percept · Result of filtering

Memphis, University of

106

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

2 Fuels Used and End Uses in U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings...

107

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

2 Household Demographics of U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings...

108

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Asked (Apartments in Buildings" "With 5 or More Units)",19.1,5.8,6.2,2.8,2.8,1.5 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

109

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Not Asked (Apartments in Buildings" "With 5 or More Units)",19.1,4.4,3.7,6.2,4.7 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

110

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Not Asked (Apartments in Buildings" "With 5 or More Units)",19.1,9.6,5,2.2,1.5,0.8 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

111

TRENDS IN THE ORGANIZATION OF WORK IN THE UNITED STATES  

E-Print Network [OSTI]

Explored in this paper are the potential effects on the American capitalist system of the latest trends in technology and the division of labor.

Kershenbaum, Richard

1970-01-01T23:59:59.000Z

112

United States Government  

Broader source: Energy.gov (indexed) [DOE]

LICE F 137: r.e Electr LICE F 137: r.e Electr onic Form App roved by CllR - 1010fJI2002 i/JI~~I United States Government Department of Energy Bonneville Power Admi istration memorandum DATE : REPLY TO AnN OF : KEPR-4 SUBJECT: Environmental Clearance Memorandum TO: Stephen Duncan Project Manager - TERS-3 Proposed Action: Removal of de-stabilized and downed trees resulting from a December 200 8 wind storm on the de-energized Lyons Ultra High Voltage Test Line NO.1. PP&A Project No.: PP&A 1309 Budget Information: Work Order # 184006 Categorical Exclusion Applied (from Subpart 0, 10 C.F.R. Part 1021): B 1.3 Routine maintenance/custodial services for buildings, structures, infrastructures, equipment. Location: Fee-owned ROW on the de-energized Lyons UHV Te st Line No .1 to the south of

113

United States Government Department  

Broader source: Energy.gov (indexed) [DOE]

B.89) B.89) EFO (07-90) United States Government Department of Energ Memorandum SEP 24 20t DATE: REPLY TO: IG-34 (A04TG032) Audit Report No.: OAS-L-04-21 SUBJECT: Evaluation of "The Federal Energy Regulatory Commission's Cyber Security Program - 2004" TO: Chairman, Federal Energy Regulatory Commission The purpose of this report is to inform you of the results of our annual evaluation of the Federal Energy Regulatory Commission's unclassified cyber security program. This evaluation was initiated in June 2004 and our field work was conducted through September 2004. The evaluation methodology is described in the attachment to this report. Introduction and Objective The Commission's increasing reliance on information technology (IT) is consistent with satisfying the President's Management Agenda initiative of expanding electronic

114

United States Government  

Broader source: Energy.gov (indexed) [DOE]

:)£ F 13 :)£ F 13 ;' 5 H e Etectroou: Form Approved by CGJR - 01120195 (n·/w! United States Government Department of Energy Bonneville Power Administration memorandum DATE: 0 I. 7 20D 9 REPLY TO AnN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum TO : Robert Macy Project Manager - TELF-TPP-3 Proposed Action: Perform routine access road maintenance to the Rockdale Microwave site . Budget Information: Work Order #180709 PP&A Project No.: 1389 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities .. .for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective .... are required to maintain ... infrastructures . ..in a condition suitable for a facility to be used for its designed purpose.

115

United States Government  

Broader source: Energy.gov (indexed) [DOE]

nUnited States Government Department of Energy Bonneville Power Administration memorandum REPLY TO AnN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum TO: Robert Macy Project Manager - TELF-TPP-3 Proposed Action: Access road improvement and bridge replacement for the Raver-Paul No. transmission line structure 18/1. Budget Information: Work Order # 00220048 PP&A Project No.: 954 Proposed by: Bonneville Power Administration (BPA) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities .. .for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective ....are required to

116

PUREX facility preclosure work plan  

SciTech Connect (OSTI)

This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D).

Engelmann, R.H.

1997-04-24T23:59:59.000Z

117

STATEMENT OF CONSIDERATIONS REQUEST BY UNITED TECHNOLOGIES CORPORATION (UNITED  

Broader source: Energy.gov (indexed) [DOE]

RTGHTS TO INVENTIONS MADE UNDER RTGHTS TO INVENTIONS MADE UNDER COOPERATIVE AGREEMENT NUMBER DE-FC04-02AL67628, DOE WAIVER NO. W(A) 02-038. The Petitioner, United Technologies, acting through the United Technologies Research Center (UTRC), has requested a waiver of all domestic and foreign patent iights to inventions that may be conceived or first actually reduced to practice in the course of UTRC's work as the prime contractor under Cooperative Agreement Number DI-FC04- 02AL67628 entitled "On-Board Vehicle, Cost Effective, Hydrogen Enhancement Technology PEM Fuel Cells" with the U S. Department of Energy (DOE). The work to be done will be the development and fabrication of an integrated high temperature water gas shift reactor/hydrogen separator for use in a PEM fuel cell power

118

STATEMENT OF CONSIDERATIONS REQUEST BY UNITED TECHNOLOGIES CORPORATION (UNITED  

Broader source: Energy.gov (indexed) [DOE]

RIGHTS TO INVENTIONS MADE UNDER RIGHTS TO INVENTIONS MADE UNDER COOPERATIVE AGREEMENT NUMBER DE-FC04-02AL67610, DOE WAIVER NO. W(A) 02-026. The Petitioner, United Technologies, acting through the United Technologies Research Center (UTRC), has requested a waiver of all domestic and foreign pateni rights to inventions that may be conceived or first actually reduced to practice in the course of UTRC's work as the prime contractor under Cooperative Agreement Number DE-FC04- 02AL67610 entitled "High Density Hydrogen Storage System Demonstration Using NaAIH4 Based Complex Compound Hydrides" with the U.S. Department of Energy (DOE). The work to be done will be the design, development and evaluation of a nydrogen storage medium and system based on NaAIH4 with a 5 kg hydrogen storage capacity and

119

United Nations A/67/L.75* General Assembly Distr.: Limited  

E-Print Network [OSTI]

and related fields Afghanistan, Albania, Angola, Armenia, Australia, Azerbaijan, Bangladesh, Belarus, Belize water resources, Appreciating the ongoing work of the organizations of the United Nations system

Cambridge, University of

120

EM Completes Salt Waste Disposal Units $8 Million under Budget...  

Broader source: Energy.gov (indexed) [DOE]

work is essential to the mission of cleaning and closing the site's underground waste tanks. Construction of these circular units - vaults built in the past are rectangular -...

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Israel, Iran, and the United States: A Precarious Alliance.  

E-Print Network [OSTI]

??The purpose of this work is to examine the relationship between Iran and Israel after Israel became a state in 1948 following the United Nations… (more)

Ellsworth, Roy J

2014-01-01T23:59:59.000Z

122

Work Force Retention Work Group Charter  

Broader source: Energy.gov [DOE]

The Work force Retention Work Group is established to support the Department’s critical focus on maintaining a high-performing work force at a time when a significant number of the workers needed to support DOE’s national security mission are reaching retirement age.

123

Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text  

SciTech Connect (OSTI)

The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1, data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.

Not Available

1993-09-01T23:59:59.000Z

124

Improving Work Flow Reliability Proceedings IGLC-7 275  

E-Print Network [OSTI]

Ballard1 ABSTRACT Improving work flow reliability is important for the productivity of linked productionImproving Work Flow Reliability Proceedings IGLC-7 275 IMPROVING WORK FLOW RELIABILITY Glenn units, and consequently for project cost and duration. One measure of work flow reliability is PPC

Tommelein, Iris D.

125

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,4.4,1,0.5,0.5,3.4,2.4,0.6,0.5 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

126

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"With 5 or More Units)",19.1,2.3,16.8,"N","N","N","N","N","N",2.3,16.8,"N","N" "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

127

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,2,0.7,1.3,2.6,4.1,3.5,2.5,2.4 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

128

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"With 5 or More Units)",19.1,6.2,3.5,0.5,0.5,1.1,0.6,"Q",0.7,0.4,0.2,2,1.4,0.6 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

129

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Buildings" "With 5 or More Units)",19.1,4.7,0.9,0.4,0.3,"Q",0.6,0.4,"Q",3.8,2.9,0.9 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

130

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,3.7,2.7,0.9,0.6,0.3,0.9,1,0.2,0.6,0.2 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

131

Unit Testing Discussion C  

E-Print Network [OSTI]

Unit Testing Discussion C #12;Unit Test public Method is smallest unit of code Input/output transformation Test if the method does what it claims Not exactly black box testing #12;Test if (actual result Expected Computed Input #12;Functionality Computation ­ Easy to test Time based Asynchronous interaction

Massachusetts at Amherst, University of

132

OSCARS Collaborative Work  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OSCARS Collaborative Work Engineering Services The Network OSCARS How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers...

133

How It Works  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How It Works Engineering Services The Network OSCARS How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers Community Read...

134

Second United Nations International Conference  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ORIGINAL: ENGLISH ORIGINAL: ENGLISH THE FREE ANTINmpliRINO ABSORPTION CROSS SECTION - P a r t I. P a r t 1 1 . Measurement of the Free Antineutrino Absorption Cross Section. by F. Reines and C. L. Cowan, Jr., Los Almcas Scientific Laboratory. Expected Cross Sectionfrmkasurernents of Fission Fragment Electron Spectrum. Los Alamos Scientific Laboratory. R. E. Carter, F. Reines, J . J . Wagner, and M. E. W y m a n , Interpretation of Results. n i . DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal IiabiIity or responsibility for the accuracy, compJeteness, or usefulness of any information,

135

Second United Nations International Conference  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Confidential until official release during Conference Confidential until official release during Conference A/CONF 15/P/729 Abstract (USA) 7 March 1958 ORIGINAL: ENGLISH HIGH-ENERGY PHYSICS WITH HYDROGEN BUBBLE CHAMBERS~ Prepared by Abstract , _ - - ' ~ u i s W. Akvarez . I e - 4 - - a c bubble chambers in high-energy physics experiments. This paper @.scusses recent experience with liquid hydrogen # - . . . 1 sify of California, Berkeley, California / This document is DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process

136

Stirling engine with air working fluid  

DOE Patents [OSTI]

A Stirling engine capable of utilizing air as a working fluid which includes a compact heat exchange module which includes heating tube units, regenerator and cooler positioned about the combustion chamber. This arrangement has the purpose and effect of allowing the construction of an efficient, high-speed, high power-density engine without the use of difficult to seal light gases as working fluids.

Corey, John A. (North Troy, NY)

1985-01-01T23:59:59.000Z

137

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

1 Space Heating in U.S. Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,"Pacific...

138

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Household Demographics of Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census...

139

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Fuels Used and End Uses in Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census...

140

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

1 Household Demographics of Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,"Pacific...

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

HC.1.11 Fuels Used and End Uses in Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census...

142

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Space Heating in U.S. Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census Division",,,,,,"East...

143

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

8 Space Heating in U.S. Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census...

144

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Household Demographics of Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

145

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Space Heating in U.S. Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" " ",,,"East North Central Census...

146

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Fuels Used and End Uses in Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

147

HQ Work Control Permit | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

HQ Work Control Permit HQ Work Control Permit HQ Work Control Permit To ensure safe operations when undertaking work at DOE Headquarters, the Office of Headquarters Health and Safety has developed a Work Permit document (doc) to help ensure the safety of all workers and headquarters employees. The form should be completed and brought to the Office of Headquarters Safety, Health and Security office at GE-112 at the Forrestal facility, or the Germantown Building Manager's office at E-076 for review and sign off. Any questions can be directed to the HQ Health and Safety office on (202) 586-1005. HQ_Work_Control_Permit.docx More Documents & Publications Preliminary Notice of Violation, Petsco and Son, Inc - EA-96-06 OSS 19.3 Confined Space Entry 5/23/95 WA_02_026_UNITED_TECHNOLOGIES_Waiver_of_Domestic_and_Foreign

148

Summary Max Total Units  

Broader source: Energy.gov (indexed) [DOE]

Max Total Units Max Total Units *If All Splits, No Rack Units **If Only FW, AC Splits 1000 52 28 28 2000 87 59 35 3000 61 33 15 4000 61 33 15 Totals 261 153 93 ***Costs $1,957,500.00 $1,147,500.00 $697,500.00 Notes: added several refrigerants removed bins from analysis removed R-22 from list 1000lb, no Glycol, CO2 or ammonia Seawater R-404A only * includes seawater units ** no seawater units included *** Costs = (total units) X (estimate of $7500 per unit) 1000lb, air cooled split systems, fresh water Refrig Voltage Cond Unit IF-CU Combos 2 4 5 28 References Refrig Voltage C-U type Compressor HP R-404A 208/1/60 Hermetic SA 2.5 R-507 230/1/60 Hermetic MA 2.5 208/3/60 SemiHerm SA 1.5 230/3/60 SemiHerm MA 1.5 SemiHerm HA 1.5 1000lb, remote rack systems, fresh water Refrig/system Voltage Combos 12 2 24 References Refrig/system Voltage IF only

149

Work with Biological Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal...

150

Electrical Safe Work Practices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electrical Safe Work Practices Electrical Safe Work Practices July 15, 2005 NOTE: Working hot is a last alternative All activities on or near electrically energized systems having live parts shall be conducted in accordance with the limitations and procedures specified in the latest version of NFPA 70E and with the safe work practices and conditions that follow. Only qualified personnel {as defined in NFPA 70E Article 110.6(D)} as authorized by supervisor can perform such work. Safe Work Practices: Know the equipment and potential hazards - Define the scope of work. Submit the scope of work to your supervisor for approval. Analyze the hazards use engineered methods to mitigate hazards. Establish procedures as necessary. Use barricades or other means to prevent unqualified persons crossing approach boundaries.

151

Interagency Sustainability Working Group  

Broader source: Energy.gov [DOE]

The Interagency Sustainability Working Group (ISWG) is the coordinating body for sustainable buildings in the federal government.

152

QEP WORKING GROUP CHARGES Assessment Working Group  

E-Print Network [OSTI]

. (Standard 2.12) During Phase I of the planning process, members of the Assessment Working Group with the institution's strategic plan, a review of the literature, definition of student learning appropriate related to goals. (Handbook for Review Committees, Standards 2.12 and 3.3.2) During Phase I

Liu, Paul

153

Work Permit # 51012MZ5 Work Order# '  

E-Print Network [OSTI]

Confined Space· 0 Ergonomics· 0 Material Handling o ,Beryllium· 0 Electrical 0 Hydraulic o Safety Harness o Electrical Working Hot o Electrical Noise 0 Potential to Cause aFalse Alarm o QiCombustible Gas o IHSurvey Dosimeter o LockoutITagout o Spill potential o Self-reading Pencil Dosimeter o Impair Fire Protection

Homes, Christopher C.

154

Working Group 7 Summary  

SciTech Connect (OSTI)

The primary subject of working group 7 at the 2012 Advanced Accelerator Concepts Workshop was muon accelerators for a muon collider or neutrino factory. Additionally, this working group included topics that did not fit well into other working groups. Two subjects were discussed by more than one speaker: lattices to create a perfectly integrable nonlinear lattice, and a Penning trap to create antihydrogen.

Nagaitsev S.; Berg J.

2012-06-10T23:59:59.000Z

155

Impact of High Wind Power Penetration on Hydroelectric Unit Operations  

SciTech Connect (OSTI)

The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-01-01T23:59:59.000Z

156

Next Generation Rooftop Unit  

Broader source: Energy.gov (indexed) [DOE]

Next Generation Rooftop Unit - Next Generation Rooftop Unit - CRADA Bo Shen Oak Ridge National Laboratory shenb@ornl.gov; 865-574-5745 April 3, 2013 ET R&D project in support of DOE/BTO Goal of 50% Reduction in Building Energy Use by 2030. CRADA project with Trane TOP US Commercial HVAC Equipment OEM 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: half of all US commercial floor space cooled by packaged AC units, consumes more than 1.0 Quad source energy/year; highly efficient systems needed

157

Next Generation Rooftop Unit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Next Generation Rooftop Unit - Next Generation Rooftop Unit - CRADA Bo Shen Oak Ridge National Laboratory shenb@ornl.gov; 865-574-5745 April 3, 2013 ET R&D project in support of DOE/BTO Goal of 50% Reduction in Building Energy Use by 2030. CRADA project with Trane TOP US Commercial HVAC Equipment OEM 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: half of all US commercial floor space cooled by packaged AC units, consumes more than 1.0 Quad source energy/year; highly efficient systems needed

158

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Household Demographics of U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to...

159

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Space Heating in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to...

160

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

5 Fuels Used and End Uses in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2"...

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

7 Space Heating in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South","West" "Space...

162

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

5 Space Heating in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2" ,,"Less than...

163

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

4 Space Heating in U.S. Homes, by Number of Household Members, 2009" " Million Housing Units, Final" ,,"Number of Household Members" ,"Total U.S.1 (millions)" ,,,,,,"5 or More...

164

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

6 Space Heating in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold","Mixed- Humid","Mixed-Dry"...

165

United Cool Air  

Broader source: Energy.gov [DOE]

While our process may start with a "basic model" it is seldom that we fabricate more than a few units that are identical.  Therefore, the definition of "basic model" has a large impact on the...

166

Associative list processing unit  

DOE Patents [OSTI]

An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full.

Hemmert, Karl Scott; Underwood, Keith D

2014-04-01T23:59:59.000Z

167

United States Department of  

E-Print Network [OSTI]

of a typical wind energy production facility, the results warrant further research on the use of acoustic;1 INTRODUCTION Over the past decade, wind energy production capacity in the United States has increased

168

United States of Agriculture  

E-Print Network [OSTI]

United States Department of Agriculture Forest Service Rocky Mountain Research Station Proceedings Research Station. 130 p. Declinesinhabitatofgreatersage, grazing practices, changes in wildfire regimes, increased spread of invasive species, gas and oil

169

Before the Senate Environment and Public Works Committee | Department...  

Broader source: Energy.gov (indexed) [DOE]

Statement Before the Committee on Environment and Public Works, United States Senate, Washington, D.C. By: Steven Chu, Secretary of Energy Subject: H.R. 2454, the American Clean...

170

EXHIBITION OF THE WORKS OF LEONARDO DA VINCI  

Science Journals Connector (OSTI)

...on "Appli-cation of the Unit Operations of Chemical Engineer-ing...attention on the control of unit operations in food processing...reached the age of seventy years, retired from active work on February...Victoria Medal to O. G. S. Crawford, for his archeological maps...

1940-05-24T23:59:59.000Z

171

Work/Life Balance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Work/Life Balance Work/Life Balance /careers/_assets/images/careers-icon.jpg Work/Life Balance Explore the multiple dimensions of a career at LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. What our employees say: Health & Wellness "The Lab pays 80 percent of my family's medical premiums with Blue Cross Blue Shield of New Mexico." Retirement & Savings "With the Lab matching my 401K contributions of six percent, I'm making good progress in saving for my retirement." Time Off "Like many of my colleagues here, I work nine hours on most work days so that I can take every other Friday off." Tax Savings "My flexible spending accounts allow me to set aside pre-tax dollars for

172

Photoelectrochemical Working Group  

Broader source: Energy.gov [DOE]

The Photoelectrochemical Working Group meets regularly to review technical progress, develop synergies, and collaboratively develop common tools and processes for photoelectrochemical (PEC) water...

173

Hydrogen Pipeline Working Group  

Broader source: Energy.gov [DOE]

The Hydrogen Pipeline Working Group of research and industry experts focuses on issues related to the cost, safety, and reliability of hydrogen pipelines. Participants represent organizations...

174

Best Buys and Unit Pricing  

E-Print Network [OSTI]

This guide explains how to determine a unit price--the cost of an item based on a specific unit such as pound or ounce. Unit pricing can be used to identify foods that are the most economical....

Anding, Jenna

2000-02-02T23:59:59.000Z

175

Work Authorization System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

It establishes a work authorization and control process for work performed by designated management and operating (M&O), management and integrating (M&I), environmental restoration management contracts (ERMC) and other contracts determined by the Procurement Executive (hereafter referred to as M&O contractors). Cancels DOE O 5700.7C. Canceled by DOE O 412.1A.

1999-04-20T23:59:59.000Z

176

Work Authorization System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. Cancels DOE O 412.1.

2005-04-21T23:59:59.000Z

177

Work Authorization System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A.

2005-04-21T23:59:59.000Z

178

Assessment of Bridge Inspection and Maintenance in the United States  

E-Print Network [OSTI]

Bridge inspection and maintenance is extremely important to the country since it is the economic lifeblood of the United States business and people relying upon them to do business and get to work. Although bridge disasters are relatively rare...

Kwok, Kin Yip George

2009-01-01T23:59:59.000Z

179

Defense Energy Support Center: Installation Energy Commodity Business Unit  

Broader source: Energy.gov [DOE]

Presentation—given at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the Defense Energy Support Center's (DESC's) Installation Energy Commodity Business Unit (CBU) including its intent, commitment, pilot project, lessons learned, and impending barriers.

180

Microsoft Word - S03368_PostClosure Unit 417  

Office of Legacy Management (LM)

Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada For Calendar Year 2006 June 2007 Office of Legacy Management DOE M1488 2007 - -L Work...

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Strategies for decommoditizing and internationalizing a prepaid business unit  

E-Print Network [OSTI]

This thesis aims to establish a new strategy for a Brazilian IT service company to leverage the operation of its prepaid business unit in Brazil and overseas. The work starts using the Delta Model to segment the customers, ...

Cavalcanti Machado, Luis Filipe (Luis Filipe Dionisio)

2011-01-01T23:59:59.000Z

182

Trails Working Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Trails Working Group Trails Working Group Trails Working Group Our mission is to inventory, map, and prepare historical reports on the many trails used at LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The LANL Trails Working Group inventories, maps, and prepares historical reports on the many trails used at LANL. Some of these trails are ancient pueblo footpaths that continue to be used for recreational hiking today. Some serve as quiet and non-motorized alternatives between the Townsite and LANL or between technical areas. The Trails Working Group, established in December 2003, includes representatives from local citizen hiking groups, Los Alamos County, Forest Service, Park Service, Los Alamos National Laboratory and the NNSA Los

183

Interagency Working Groups (IWGs)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) are the primary USGCRP vehicles for implementing and coordinating research activities within and across agencies. These groups are critical to Program integration and in assessing the Program's progress. The working groups span a wide range of interconnected issues of climate and global change, and address major components of the Earth's environmental and human systems, as well as cross-disciplinary approaches for addressing these issues. IWGs correspond to program functions and are designed to bring agencies together to plan and develop coordinated activities, implement joint activities, and identify and fill gaps in the Program's plans. They allow public officials to communicate with each other on emerging directions within their agencies, on their stakeholder needs, and on best practices learned from agency activities. Together, these functions allow the agencies to work in a more coordinated and effective manner.

184

ORISE: Working with ORISE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Oak Ridge Institute for Science Education Oak Ridge Institute for Science Education Working with ORISE If you are interested in learning about how your agency can utilize the capabilities of the Oak Ridge Institute for Science and Education (ORISE) through a Work for Others agreement or a procurement contract, or if you are looking for career opportunities, the following information provides an explanation of how to work with ORISE. If you do not see an option that applies to your needs, please contact ORISE General Information. Work for Others For organizations and agencies that are not affiliated with U.S. Department of Energy (DOE), such groups still have the opportunity to partner with the Oak Ridge Institute for Science and Education (ORISE) through the DOE Work For Others (WFO) program. DOE's WFO program allows ORISE to support

185

Planning Health Into Your Meals Unit Preparation Materials and  

E-Print Network [OSTI]

UNIT 14: Planning Health Into Your Meals Unit Preparation Materials and Facilitator Guide #12; #12;Navigating for Success Planning Health into Your Meals Copyright 2007. Do not reproduce or distribute without ­ Planning Health into Your Meals WHO: Participants and Leaders Up to 12 nutrition educators working

186

United States Government  

Broader source: Energy.gov (indexed) [DOE]

.2/06 WED 17:02 FAX 423 241 3897 OIG .2/06 WED 17:02 FAX 423 241 3897 OIG -** HQ . 001 United States Government Department of Energy Department of Energy memorandum DATE: February 9, 2006 Audit Report Number: OAS-L-06-07 REPLY TO ATTN OF; IG-32 (A050R014) SUBJECT: Audit of "The Department's Management of United States Enrichment Corporation Site Services" TO: Manager, Portsmouth/Paducah Project Office INTRODUCTTON AND OBJECTIVE The Paducah Gaseous Diffusion Plant (Paducah), located in western Kentucky, was constructed by the Department of Energy (Department) in the early 1950s to enrich uranium for use in various military and commercial applications. The Department operated the plant until the Energy Policy Act of 1992 created the United States Enrichment Corporation (USEC) as a Government-owned

187

Work Authorization System  

Broader source: Energy.gov (indexed) [DOE]

Washington, D.C. DOE O 412.1A Approved: 4-21-05 This directive was reviewed and certified as current and necessary by Susan J. Grant, Director, Office of Management, Budget and Evaluation/Chief Financial Officer, 4-21-05. SUBJECT: WORK AUTHORIZATION SYSTEM 1. OBJECTIVES. To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. 2. CANCELLATIONS. DOE O 412.1 Work Authorization System, dated 4-20-99. Cancellation of a directive does not, by itself, modify or otherwise affect any contractual

188

NREL: Working for NREL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Working for NREL Working for NREL We're always on the lookout for talented people who believe in our mission and support our values. NREL's inclusive work environment benefits from diversity throughout the organization, values individual differences, and encourages employees to develop and contribute to their full potential. Working for NREL is a challenging and exciting experience for nearly 2,300 staff members of all backgrounds. We offer competitive salaries and excellent benefits. NREL Mission While our cultures and creeds, and lifestyles and languages may differ, we share a common desire to carry out our mission- To develop renewable energy and energy efficiency technologies and practices, To advance related science and engineering, and To transfer knowledge and innovations to address the nation's energy

189

How Hybrids Work  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How Hybrids Work How Hybrids Work Diagram of full hybrid vehicle components, including (1) an internal combustion engine, (2) an electric motor, (3) a generator, (4) a power split device, and (5) a high-capacity battery. Flash Animation: How Hybrids Work (Requires Flash 6.0 or higher) HTML Version: How Hybrids Work Hybrid-electric vehicles (HEVs) combine the benefits of gasoline engines and electric motors and can be configured to obtain different objectives, such as improved fuel economy, increased power, or additional auxiliary power for electronic devices and power tools. Some of the advanced technologies typically used by hybrids include Regenerative Braking. The electric motor applies resistance to the drivetrain causing the wheels to slow down. In return, the energy from the

190

Strategic Initiatives Work Group  

Broader source: Energy.gov [DOE]

The Work Group, comprised of members representing DOE, contractor and worker representatives, provides a forum for information sharing; data collection and analysis; as well as, identifying best practices and initiatives to enhance safety performance and safety culture across the Complex.

191

How NIF Works  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How NIF Works A weak laser pulse-about 1 billionth of a joule-is created, split, and carried on optical fibers to 48 preamplifiers that increase the pulse's energy by a factor of...

192

Clean Energy Works (Oregon)  

Broader source: Energy.gov [DOE]

Clean Energy Works began in 2009 as a pilot program run by the City of Portland. In 2010, the US department of Energy awarded $20 million to create a statewide nonprofit to expand the program...

193

United States Department of  

E-Print Network [OSTI]

: For additional copies: U.S. FOREST SERVICE U.S. Forest Service 11 CAMPUS BLVD SUITE 200 Publications Distribution Forest, New Hampshire, began in 1932. One of the studies, still maintained today, consisted of severalUnited States Department of Agriculture Forest Service Northern Research Station Research Paper NRS

194

United States Department of  

E-Print Network [OSTI]

Station at Durham, New Hampshire. The computer program described in this publication was created usingUnited States Department of Agriculture Forest Service Northern Research Station General Technical://www.nrs.fs.fed.us/ Published by: For additional copies: U.S. FOREST SERVICE U.S. Forest Service 11 CAMPUS BLVD SUITE 200

195

United States Department of  

E-Print Network [OSTI]

copies: USDA FOREST SERVICE USDA Forest Service 11 CAMPUS BLVD SUITE 200 Publications Distribution at Durham, New Hampshire; JENNIFER C. JENKINS, jjenkins@fs.fed.us, is a research foresterUnited States Department of Agriculture Forest Service Northeastern Research Station General

196

FISHERY STATISTICS UNITED STATES  

E-Print Network [OSTI]

FISHERY STATISTICS OF THE UNITED STATES 1973 STATISTICAL DIGEST NO. 67 Prepared by STATISTICS a review of the fishery statistics for the year 1973 . These statistics include data on the volume and value of landings of fishery products, employment 1n the fish- eries, quantity of gear operated, number

197

FISHERY STATISTICS UNITED STATES  

E-Print Network [OSTI]

FISHERY STATISTICS OF THE UNITED STATES 1971 STATISTICAL DIGEST NO. 65 Prepared by STATISTICS ry statistics for the year 1971 . These statistics include data on the volume and value of landings of fishery products, employment in the fishe ries, quantity of gear operated, number of fishing craft e

198

United States Department of  

E-Print Network [OSTI]

play an important role in a national program for reducing greenhouse gas emissions. The conversion potential through conversion of nonforest land to forest land and through the management of forest lands and sinks in the United States can be identified. International treaties on greenhouse gas reduction require

199

United States Department of  

E-Print Network [OSTI]

as an offset, or for registering carbon dioxide reductions using the U.S. Department of Energy 1605(b. Brown Richard A. Birdsey #12;Visit our homepage at: http://www.nrs.fs.fed.us/ Published by forestry companies and managers of utility company lands, within the United States who are interested

200

United Nations Development Programme  

E-Print Network [OSTI]

United Nations Development Programme Bureau for Development Policy Energy and Atmosphere Programme Development Programme with support from the Government of Norway #12;The views expressed in this volume. #12;5 Acknowledgements 6 Notes on Authors 7 Foreword 9 Executive Summary 27 Introduction: Energy

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

United States Environmental Protection  

E-Print Network [OSTI]

quality in public water systems; remediation of contaminated sites, sediments and ground water; preventionUnited States Environmental Protection Agency Hydrogeologic Framework, Ground-Water Geochemistry/R-02/008 January 2002 Hydrogeologic Framework, Ground-Water Geochemistry, and Assessment of Nitrogen

202

United States Department of  

E-Print Network [OSTI]

Hills National Forest uses such a habitat capability model (HABCAP), but its accuracy is largely unknown, Wildlife Biologist with Black Hills National Forest, Custer, SD 2 South Dakota State UniversityUnited States Department of Agriculture Forest Service Rocky Mountain Forest and Range Experiment

203

United States Department of  

E-Print Network [OSTI]

United States Department of Agriculture Managing Habitats for White-tailed DeerForest Service Rocky Mountain Forest and Range Experiment Station Fort Collins, Colorado 80526 General Technical Report RM-GTR-274 Black Hills and Bear Lodge Mountains of South Dakota and Wyoming Carolyn Hull Sieg and Kieth E

204

United States Department of  

E-Print Network [OSTI]

United States Department of Agriculture Forest Service Pacific Northwest Research Station General.S. Department of Agriculture, Forest Service, Pacific Northwest Research Station. 25 p. Estimates of forest of California's legislatively mandated green- house gas inventory. Reliable estimates of live-tree carbon stores

Fried, Jeremy S.

205

Work Life Balance | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Work Life Balance Work Life Balance Work Life Balance Working at Y-12 has many advantages. In addition to the many benefit options, Y-12 also offers opportunities for a great work-life balance. Community Involvement Y-12 is a proud member of the community. Employees participate in the United Way annual giving campaign and serve as volunteers for charitable groups in the communities where they live and work. Each year Y-12 employees participate in a day of volunteering for local charities (on average 300-plus employees participate each year). Flexible Work Options Y-12 encourages employees to achieve a healthy personal balance among home, work and the community. One of the ways we embrace work-life balance is by offering flexible work arrangements that provide alternatives to the

206

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

0 Home Appliances Usage Indicators by Type of Housing Unit, 2005" " Million U.S. Housing Units" ,,"Type of Housing Unit" ," Housing Units (millions) ","Single-Family...

207

B Plant Complex preclosure work plan  

SciTech Connect (OSTI)

This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

ADLER, J.G.

1999-02-02T23:59:59.000Z

208

Mon Valley work plan  

Office of Legacy Management (LM)

GWSHP 1.8 GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for Characterization Activities at the Shiprock UMTRA Project Site June 1998 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number UGW-511-0020-01-000 Document Number U0013400 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0013400 Contents DOE/Grand Junction Office Work Plan for Characterization Activities at Shiprock Project Site June 1998 Draft Final Page v Contents Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.0 Introduction .

209

How Fuel Cells Work  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How Fuel Cells Work How Fuel Cells Work Diagram: How a PEM fuel cell works. 1. Hydrogen fuel is channeled through field flow plates to the anode on one side of the fuel cell, while oxygen from the air is channeled to the cathode on the other side of the cell. 2. At the anode, a platinum catalyst causes the hydrogen to split into positive hydrogen ions (protons) and negatively charged electrons. 3. The Polymer Electrolyte Membrane (PEM) allows only the positively charged ions to pass through it to the cathode. The negatively charged electrons must travel along an external circuit to the cathode, creating an electrical current. 4. At the cathode, the electrons and positively charged hydrogen ions combine with oxygen to form water, which flows out of the cell.

210

ORISE: Work Smart Standards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Work Smart Standards Work Smart Standards ORISE Work Smart Standards Set for Environment, Safety, and Health Revision #1, March 21, 2000 Revision #2, Sept. 29, 2000 Revision #3, June 28, 2001 Revision #4, Nov. 9, 2001 Revision #5, Nov. 30, 2001 Revision #6, Jan. 31, 2002 Revision #7, June 28, 2002 Revision #8, Oct. 17, 2002 Revision #9, Nov. 21, 2002 Revision #10, Feb. 28, 2003 Revision #11, May 23, 2003 Revision #12, May 30, 2003 Revision #13, Oct. 30, 2003 Revision #14, Jan. 21, 2004 Revision #15, May 24, 2004 Revision #16, Aug. 17, 2004 Revision #17, Aug. 27, 2004 Revision #18, Oct. 14, 2004 Revision #19, March 28, 2005 Revision #20, May 31, 2005 Revision #21, Aug. 24, 2005 Revision #22, Feb. 17, 2006 Revision #23, March 22, 2006 Revision #24, May 19, 2006 Revision #25, July 26, 2006 Revision #26, Nov. 28, 2006

211

Working with NIST  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NIST NIST Terry Lynch Office of Technology Partnerships How to Work with NIST How to Work with NIST „ „ Standards Standards „ „ Collaborative Research & Technology Devolvement Collaborative Research & Technology Devolvement Programs Programs „ „ Invention Licensing Invention Licensing Collaborative Research & Technology Collaborative Research & Technology Development Programs Development Programs „ „ Informal collaboration involving intramural research programs Informal collaboration involving intramural research programs „ „ Guest Research Agreements Guest Research Agreements „ „ Facility Use Agreements Facility Use Agreements „ „ Material Transfer Agreements Material Transfer Agreements „ „ Cooperative Research and Development Agreements (CRADA

212

United States Government  

Broader source: Energy.gov (indexed) [DOE]

uv /uu/u* ±.u.. J.OJ..L rAA , *. . uv /uu/u* ±.u.. J.OJ..L rAA , *. . 'A4 .. ± OO, I U444 flmI I.j102 ' -f- $I)002 EP<.1 (o-.vu) United States Government Department of Energy memorandum DATE: January 30, 2004 REP.YTO: IG-35 (A03DN039) Audit Report No.: OAS-L-04-10 SUBJECT: Audit of the Safeguards and Security Program at the Rocky Flats Environmental Technology Site To: Frazer Lockhart, Manager, Rocky Flats Field Office INTRODUCTION AND OBJECTIVE Because of the terrorist attacks against the United States on September 11, 2001, the Department of Energy (Department) instituted additional security requirements beyond those already in place for normal security operations. These "Security Conditions" requirements were established by Department Notice 473.8 (Notice). The requirements are based on

213

United States Environmental Monitoring  

Office of Legacy Management (LM)

EPA 60014-91/030 EPA 60014-91/030 Environmental Protection Systems Laboratory DOE/DP00539-063 Agency P.O. Box 93478 Las Vegas NV 891 93-3478 Research and Development Offsite Environmental Monitoring Report: 1 - 3 5 Radiation Monitorina Around * / (- P 7 1 United States ~ u c l g a r Test Areas Calendar Year 1990 This page intentionally left blank EPN60014-90 DOWDP Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1990 Contributors: D.J. Chaloud, B.B. Dicey, D.G. Easterly, C.A. Fontana, R.W. Holloway, A.A. Mullen, V.E. Niemann, W.G. Phillips, D.D. Smith, N.R. Sunderland, D.J. Thome, and Nuclear Radiation Assessment Division Prepared for: U.S. Department of Energy under Interagency Agreement Number DE-A108-86-NV10522

214

l UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

UNITED STATES GOVERNMENT UNITED STATES GOVERNMENT lb 15 SUBJECT: THORFJM PROCURENENT PMF'N:TBU Jesse C. Johnson, Gtnager of IRaw Materials Operations3s.Office 3 R. W. Cook, Director of Production ~',LL:::+ I--- DATE: MAR ! 9 1951 The following list of suppliers of thorium and the amounts of materials procured from them by the Mew York Operations Office during calendar year 1950 is being supplied in accordance with Mr. Spelmanls telephone request of March 19. Thorium Lannett Bleachery iinde Air Products Co. Lindsey Light & Chemical Co. lliscellaneous NY0 Liscensing Division Rare Earths, Inc. Wolff-Alport Total - (kilograms) 179 38,2;2 -3 4,210 /vyeoi 4 -q- 2 : i ' \ iti 1 i 0 ;;\I:' --' I F 10 i;;;?/ \ --' L & ;:I :,- :,j( EZi 5 1 :' -I I ri _ I ' R i; .- . )- .i

215

United States Government  

Broader source: Energy.gov (indexed) [DOE]

ng ng United States Government Department of Energy Memorandum OFFICE OF INSPECTOR GENERAL DATE: APR 18 2003 REPLY TO ATTN OF: IG-34 (A02PR010) Audit Report No.: OAS-L-03-15 SUBJECT: Audit of the Weatherization Assistance Program TO: Director, Weatherization and Intergovernmental Program, EE-2K The purpose of this report is to inform you of the results of our audit of the Weatherization Assistance Program. INTRODUCTION AND OBJECTIVE The Weatherization Assistance Program (Program) was established to increase energy efficiency in dwellings owned or occupied by low-income persons to reduce their residential energy expenditures and improve their health and safety. Since its inception in 1976, the Program has reported that approximately 5 million dwelling units owned or occupied by low-income individuals have been weatherized.

216

United States Government Department  

Broader source: Energy.gov (indexed) [DOE]

OE r 1325.0 OE r 1325.0 (01.93) United States Government Department of memorandum DATE: March 23, 2006 Audit Report Number: OAS-L-06-09 REPLY TO ATTN OF: IG-32 (A060R040) SUBJECT: Audit of"The Department of Energy's Management of the Northeast Home Heating Oil Reserve" TO, Deputy Assistant Secrctary for Petroleum Reserves INTRODUCTION AND OBJECTIVE The Energy Act of 2000 authorized the Secretary of Energy to create a Northeast Home Heating Oil Reserve (Reserve). The Reserve was established as an "emergency buffer" to supplement commercial supplies should a severe supply disruption occur in the heavily heating oil-dependent northeast United States. The Reserve consists of 2 million barrels of emergency home heating oil, enough to provide Northeast consumers adequate supplies for approximately

217

United States Government  

Broader source: Energy.gov (indexed) [DOE]

United States Government United States Government Department of Energy Memorandum DATE: July 29, 2005 REPLY TO ATTN TO: IG-34 (A05HQ002) Audit Report No. OAS-L-05-10 SUBJECT: Agreed-Upon Procedures for Federal Payroll TO: Director, Office of Management, Budget, and Evaluation/Chief Financial Officer, ME-1 INTRODUCTION AND OBJECTIVE The Office of Management and Budget (OMB) Bulletin No. 01-02, "Audit Requirements for Federal Financial Statement," dated October 16, 2000, requires an annual audit of civilian payroll of executive departments and other Government agencies. Auditors are required to follow the agreed-upon procedures in Appendix I-1 of OMB Bulletin No. 01-02, to assess the reasonableness of life insurance, health benefits, and retirement withholdings and contributions.

218

UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

Menxmmhmz 9 Menxmmhmz 9 1 / UNITED STATES GOVERNMENT i TO : ThcFFles . mx.f I A. B. Piccct, +3lation section : DATE: .@.eti 16, 1949 SUBJECT: VISIT To HAVY OFfDHAlfCE DEPOT, EARIZ, B.J. FmmlTo ,sYmOL: DH:ARP . . : OnJuly 8,&g the uriterattendedameeting at the Navy Oxdnce Depot at Farle, Ii. J. for the purpose of advising the navy on i-adlatlon hazards involved In the dmping of contadnated AEC wastes at /?ea. " Presint were: J. Cook - Traffic & Transportation, AEC ~J.Moren- Utilifation, AEC ..J. Ccnmigl.io - Chief of Middlesex Operaticns A. PIhot -~Hadiation Section, AEC Captain Blossoin - Navy Captain hall - Navy ThefoSkndngwas agreedupcmby AFC andthe l&v. 1. 2. 3. 4. Contaminatedmaterial dnmied, I (loose in case of large contaminated units) loaded on truck&and lsonltored at'

219

Contamination analysis unit  

DOE Patents [OSTI]

The portable Contamination Analysis Unit (CAU) measures trace quantifies of surface contamination in real time. The detector head of the portable contamination analysis unit has an opening with an O-ring seal, one or more vacuum valves and a small mass spectrometer. With the valve closed, the mass spectrometer is evacuated with one or more pumps. The O-ring seal is placed against a surface to be tested and the vacuum valve is opened. Data is collected from the mass spectrometer and a portable computer provides contamination analysis. The CAU can be used to decontaminate and decommission hazardous and radioactive surface by measuring residual hazardous surface contamination, such as tritium and trace organics It provides surface contamination data for research and development applications as well as real-time process control feedback for industrial cleaning operations and can be used to determine the readiness of a surface to accept bonding or coatings.

Gregg, Hugh R. (Livermore, CA); Meltzer, Michael P. (Livermore, CA)

1996-01-01T23:59:59.000Z

220

Contamination analysis unit  

DOE Patents [OSTI]

The portable Contamination Analysis Unit (CAU) measures trace quantities of surface contamination in real time. The detector head of the portable contamination analysis unit has an opening with an O-ring seal, one or more vacuum valves and a small mass spectrometer. With the valve closed, the mass spectrometer is evacuated with one or more pumps. The O-ring seal is placed against a surface to be tested and the vacuum valve is opened. Data is collected from the mass spectrometer and a portable computer provides contamination analysis. The CAU can be used to decontaminate and decommission hazardous and radioactive surfaces by measuring residual hazardous surface contamination, such as tritium and trace organics. It provides surface contamination data for research and development applications as well as real-time process control feedback for industrial cleaning operations and can be used to determine the readiness of a surface to accept bonding or coatings. 1 fig.

Gregg, H.R.; Meltzer, M.P.

1996-05-28T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Integrated solar heating unit  

SciTech Connect (OSTI)

This patent describes an integral solar heating unit with an integral solar collector and hot water storage system, the unit comprising: (a) a housing; (b) a flat plate solar collector panel mounted in the housing and having a generally horizontal upper edge and an uninsulated, open back surface; (c) a cylindrical hot water tank operatively connected to the solar collector panel and mounted in the housing generally parallel to and adjacent to the upper edge; (d) the housing comprising a hood around the tank a pair of side skirts extending down at the sides of the panel. The hood and side skirts terminate at lower edges which together substantially define a plane such that upon placing the heating unit on a generally planar surface, the housing substantially encapsulates the collector panel and hot water tank in a substantially enclosed air space; (e) the collector including longitudinally extended U-shaped collector tubes and a glazed window to pass radiation through to the collector tubes, and a first cold water manifold connected to the tubes for delivering fresh water thereto and a second hot water manifold connected to the tubes to remove heated water therefrom. The manifolds are adjacent and at least somewhat above and in direct thermal contact with the tank; and, (f) the skirts and hood lapping around the collector panel, exposing only the glazed window, such that everything else in the heating unit is enclosed by the housing such that heat emanating from the uninsulated, open back face of the collector and tank is captured and retained by the housing to warm the manifolds.

Larkin, W.J.

1987-01-20T23:59:59.000Z

222

Hoechst plans Mexican unit  

SciTech Connect (OSTI)

Hoechst is considering plans to build its first ethoxylates project in Mexico, Mark Sijthoff, head of surfactants and auxiliaries for Hoechst`s specialty chemical business unit, tells CW. The company expects to make a decision on the 30,000-m.t./year project by the end of the year. Sijthoff would not disclose the site or where ethylene oxide (EO) feed would be obtained. The plan may depend on results of the privatization of Petroleos Mexicanos (Pemex), which is the only producer of EO in Mexico. Hoechst is part of a consortium bidding on the privatization. Sources say the unit will be built at Quimica Hoechst`s Coatzacoalcos site, close to Pemex`s EO plants at Cangregera and Morelos. A planned EO expansion at Morelos will probably move ahead when the sell-off is completed. Sijthoff says that Hoechst is also looking at improving its US surfactants position, although the company has no plans to expand ethoxylates, as there is {open_quotes}plenty of capacity.{close_quotes} Hoechst started up a 150-million lbs/year plant at Clear Lake, TX last year, ending a tolling agreement with Union Carbide. In addition, Rhone-Poulenc recently started a unit at Marcus Hook, PA, and Condea Vista is doubling its ethoxylation capacity at Lake Charles, LA. Meanwhile, Hoechst is still considering construction of 30,000-m.t./year ethoxylation plant in India or China. A decision is expected later this year.

Wood, A.; Alperowicz, N.

1996-05-22T23:59:59.000Z

223

ICDF Complex Remedial Action Work Plan  

SciTech Connect (OSTI)

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

224

Classic work on astronomy  

Science Journals Connector (OSTI)

... A History of Ancient Mathematical Astronomy. Part 1: Pp. xxi + 1?555. Part 2: Pp. 556?1 ... a magnificent work that will surely become a major classic in the historiography of ancient astronomy, a three-volume treatise devoted almost entirely to the mathematical ...

G. J. Whitrow

1976-03-18T23:59:59.000Z

225

Moulinath Banerjee Work Address  

E-Print Network [OSTI]

.Stat.(Honors) 1995, in First Division with Distinction. Employment Associate Professor of Statistics, UniversityMoulinath Banerjee Work Address University of Michigan Department of Statistics 439, West Hall 1085 estimation, Statistical Methods in Astronomy, Biomedical studies and Epidemiology, Threshold and boundary

Banerjee, Moulinath

226

Moulinath Banerjee Work Address  

E-Print Network [OSTI]

.Stat.(Honors) 1995, in First Division with Distinction. Employment Associate Professor of Statistics, University Methods in Non­standard Problems. Currently employed as Tenure-track Assistant Professor of StatisticsMoulinath Banerjee Work Address University of Michigan Department of Statistics 439, West Hall 1085

Banerjee, Moulinath

227

Help for Working Capital  

Science Journals Connector (OSTI)

Help for Working Capital ... It takes a sharp pencil to figure out ways and means of all eviating the constant pressure for new money for capital expenditure needed by our steadily expanding industry ... These funds not only must now absorb higher operating costs, but also must be counted upon heavily for capital expenditure as well. ...

HARRIS MCASHAN

1950-12-18T23:59:59.000Z

228

Work Force Discipline  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order provides guidance and procedures and states responsibilities for maintaining work force discipline in DOE. Chg 1, dated 3-11-85; Chg 2, dated 1-6-86; Chg 3, dated 3-21-89; Chg 4, dated 8-2-90; Chg 5, dated 3-9-92; Chg 6, dated 8-21-92, cancels Chg 5.

1983-03-23T23:59:59.000Z

229

Working and Net Available Shell Storage Capacity  

U.S. Energy Information Administration (EIA) Indexed Site

Working and Net Available Shell Working and Net Available Shell Storage Capacity November 2013 With Data as of September 30, 2013 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | Working and Net Available Shell Storage Capacity as of September 30, 2013 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or

230

Working With Berkeley Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Working with the Lab Working with the Lab A-Z Index Search Phone Book Comments Ernest Orlando Lawrence Berkeley National Laboratory Technology Transfer Patent Department Sponsored Projects Office Procurement: Doing Business with the Lab Visitor Information Scientififc Divisions and National User Facilities UC Campus-Labs Collaboration Programs Berkeley Lab stresses collaboration in everything we do. The Laboratory is involved in many research partnerships with private industry. Our mission also includes the transfer of Laboratory inventions to the private sector for rapid commercialization. The role of the Technology Transfer Office is to make technology and expertise developed here available to industry. Contact the Technology Transfer Office to pinpoint research areas of common interest, negotiate rights to Laboratory intellectual property, and to discuss current patent and copyright licensing opportunities.

231

Working Group Reports  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 Working Group Reports Special Working Session on the Role of Buoy Observations in the Tropical Western Pacific Measurement Scheme J. Downing Marine Sciences Laboratory Sequim, Washington R. M. Reynolds Brookhaven National Laboratory Upton, New York Attending W. Clements (TWPPO) F. Barnes (TWPPO) T. Ackerman (TWP Site Scientist) M. Ivey (ARCS Manager) H. Church J. Curry J. del Corral B. DeRoos S. Kinne J. Mather J. Michalsky M. Miller P. Minnett B. Porch J. Sheaffer P. Webster M. Wesely K. Zorika G. Zhang Focus of Discussion The session convened on March 2, with brief introductions by Bill Clements. The purpose of the session was to discuss the scientific merits of retrofitting TOGA/TAO buoys with shortwave radiometers. Three questions were posed at the outset of the session to focus the discussion.

232

HANFORD ENGINEER WORKS  

Office of Legacy Management (LM)

HANFORD ENGINEER WORKS HANFORD ENGINEER WORKS IJd *P-t - - ~~~ssiticatiC+n cwcetted rat G.E. NUCLEONICS PROJECT xi I ~@L.%&~--G-ENERAI,@ ELECTRIC z ,m ._.__.-. _ I--..-. By Authority of. COMPANY ._ Atmic Energy Commission Office of Hanford Dire&xl Operations Riohland, Washington Attention; Mr. Carleton Shugg, Manager ./ ALPKA-ROLLED EL'GIL%I jw -879 ' . *_ a. f' Richland, Washington February 6, 1948 , Thla Dclc.Jv-

233

Putting Dollars to Work  

E-Print Network [OSTI]

the extent to which bacteria are present. If these data demonstrate the need for an assessment of total maximum daily loads, experts in bacterial source tracking will help plan and imple- ment appropriate follow-up. Dairy Compost Utilization... This project addresses the elevated concentrations of ammonia, nitrogen, phosphorus and fecal bacteria found in parts of the North Bosque River, Upper North Bosque River and Leon River. Texas A&M agricultural scientists are working with composters...

Wythe, Kathy

2006-01-01T23:59:59.000Z

234

SEWAGE: Algae at Work  

Science Journals Connector (OSTI)

SEWAGE: Algae at Work ... Taking their cue from the successful use of bacteria to rid sewage of biodegradable wastes, engineers at the University of Kansas and Trans Union Corp. have a process that uses algae to remove inorganic nitrogen, phosphorus, and carbon compounds from secondary treatment plant effluent. ... Though it has long been known that algae feed on inorganic wastes, the phenomenon had not been thought to hold much promise for sewage treatment. ...

1969-09-01T23:59:59.000Z

235

Energy Management in Olefins Units  

E-Print Network [OSTI]

to the point where waste heat from pyrolysis generates more than enough steam to power the olefins unit recovery section. Furthermore, incorporating gas turbine driven electrical generators or process compressors adds to the utility export potential of the unit...

Wells, T. A.

1982-01-01T23:59:59.000Z

236

United States Science Offices Abroad  

Science Journals Connector (OSTI)

... PLANS for United States Science ...Offices at A home and abroad are proposed in the extensive report entitled " ...

C. E. SUNDERLIN

1950-07-15T23:59:59.000Z

237

TRU TeamWorks  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

, 2004 , 2004 By the Numbers WIPP marks five-year anniversary Shipments scheduled to arrive at WIPP for the week of 4/4/04 - 4/10/04: 18 Total shipments received at WIPP: 2,456 Total volume disposed at WIPP: 19,042 m 3 FY04 Performance Metrics D E P A R T M E N T O F E N E R G Y U N I T E D S T A T ES O F A M E R I C A TeamWorks TeamWorks TRU A weekly e-newsletter for the Waste Isolation Pilot Plant team For those who endured the early morning cold of March 26, 1999, to witness WIPP's first shipment, it may seem like yesterday. Yet Friday marked five years of WIPP operations. Relative newcomer to WIPP - but not to the waste management industry - CBFO Deputy Manager Lloyd Piper observed, "The transformation from a facility in "standby" mode to operational mode has been nothing short of amazing."

238

WORKING PAPER N 2012 -11  

E-Print Network [OSTI]

. It is an extension of a report from the quantitative pillar of the WORKS project than can be accessed to the promotion of sustainable work and to workplace innovation. The relation between quality of work of quality of work with three main objectives: provide a general mapping of quality of work across European

Paris-Sud XI, Université de

239

Process-circuit and layout solutions for steam-turbine units and performance efficiency of thermal power plants  

Science Journals Connector (OSTI)

Criteria for evaluating process-circuit and layout solutions adopted in designing steam-turbine units are presented together with their values for a number of steam-turbine units produced by the Ural Turbine Work...

A. A. Gol’dberg; T. L. Shibaev

2014-12-01T23:59:59.000Z

240

United States Government Memorandum  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Department of Energy United States Government Memorandum DATE: March 21, 2008 Audit Report Number: OAS-L-08-08 REPLY TO ATTN OF: IG-321 (A07LV042) SUBJECT: Audit Report on "Accountability of Sensitive and High Risk Property at the Nevada Site Office" TO: Acting Manager, Nevada Site Office INTRODUCTION AND OBJECTIVE and control over sensitive and high risk property because of the vulnerability to loss, theft or misuse and its potential impact on national security interests or proliferation concerns. Items such as portable and desktop computers, ammunition. and firearms are examples of sensitive property. In addition, federal regulations require that Departmental organizations and designated contractors account for and control govemroent-owned high risk property, such as body armor and gas masks,

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

242

United States Government  

Office of Legacy Management (LM)

D;il$;,8 p! A . I I& - ' D;il$;,8 p! A . I I& - ' z United States Government &mtrne&' of Energy DATE: &uG 3, 9 394 REPLY TO AITN OF: EH-421 (W. A. Williams, 427-1719) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of Mr. Doug Toukay and Ms. Michelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recommdations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites and to ratify and confirm the

243

Unite2 States Government  

Office of Legacy Management (LM)

+39J +39J t% (3740~ - Unite2 States Government m e m o randuin L3 DATE: AU6 3, 9 %g4 REPLY TO All-N OF: m -421 (U. A. W illiams, 427-1719) -. - >' SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of Hr. Doug Toukay and Ms. M ichelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recouwndations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites and to ratify and confirm the

244

United States Government  

Broader source: Energy.gov (indexed) [DOE]

/18/04 THU 11:31 FAX 423 241 3897 OIG -- /18/04 THU 11:31 FAX 423 241 3897 OIG -- + HQ 1002 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: March 17, 2004 Audit Report No. OAS-L-04-1 1 REPLY TO IG-36 (A04DN003) ATTN OF: SUBJECT; Audit of "Requests for Equitable Adjustment at the Rocky Flats Environmental Technology Site" TO: Frazer R. Lockhart, Manager, Rocky Flats Project Office INTRODUCTION AND OBJECTIVE Effective February 1, 2000, the Department of Energy's (Department) Rocky Flats Project Office (RFPO) and Kaiser-Hill Co., LLC (Kaiser-Hill), entered into a cost- plus-incentive-fee contract to close the Rocky Flats Environmental Technology Site (Rocky Flats) by December 15, 2006. Under the contract terms, Kaiser-Hlill's final incentive fee earned will be based on how well it meets established cost targets. For

245

United States Government  

Broader source: Energy.gov (indexed) [DOE]

. . . .... ...... ..... .. . .. . . .. . , . . . . ..- - --. -- -. , . . DOEF 1325,8 (08.93) United States Government Department of Energy memorandum DATE: August 13, 2007 1 Audit Report Number: OAS-L-07-21 REPLY TO ATTN OF: IG-32 (A06PR047) SUBJECT: Audit of Executive Compensation at Selected National Nuclear Security Administration Sites TO: Director, Policy and Internal Controls Management, NA-66 INTRODUCTION AND OBJECTIVE As part of a Department of Energy-wide audit of executive compensation, we reviewed fourN* Lti nai-.AL 4 ... :.. ,._*i Amiinistration (NiNSA)SsitCe. Speuiiiu-~l we reviewed executive cormpeisation costs incurred and claimed for Fiscal Years 2003, 2004, and 2005 at Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratory (LLNL), Sandia National Laboratories, and the Y-12

246

United States Government  

Office of Legacy Management (LM)

. v-w. . v-w. ' ;H; (07.901 United States Government 0' ; Td 2, <.<~ Department of Energy ' m e m o randum DATE: REPLY TO Al-TN OF: EM-421 (W. A. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at Alba Craft Laboratory in Oxford, Ohio L. Price, OR TO: The former Alba Craft Laboratory site at lo-14 West Rose Avenue, Oxford, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Dr. and M rs. Gilbert Pacey, of Oxford, Ohio, own the site. This designation is based on the results of a radiological survey and conclusions from an authority review as noted in the attached Designation Summary. Copies of the radiological survey letter report and the authority review are provided for your information.

247

UNITED STATES GOVERKMENT  

Office of Legacy Management (LM)

Ojice Memornndz~nz 0 Ojice Memornndz~nz 0 UNITED STATES GOVERKMENT By application dated ;!ay 11, 1959, as a~zen:ii:d Hay 25, 1959, the a--T+- I-r-- cant requests that its license SW-33 be amend,ed to authorizt? proced- ures for t>e CCLl-ect conversion of LT6 to '3$ and by applicaticn datzci June 29, 1959, a.3 n:odifizd July 15, 1059, the shipment of uranium rdioxide pellets. Based on our rexiew of the information finished by the applicant, it is hereby determined that the applicant is qualified, by training and experience, to use special nuclear material for the pwpose requested and that the ap@icant's procedures, facilities and equip- ment are adequate to protect health and minimize danger to life and property. It is, therefore, determined that ~NM-33 may be amended to

248

United States Government  

Office of Legacy Management (LM)

ocy F 1325.8 ocy F 1325.8 rcro1 . 6Fo0?-001 w 2 3-q United States Government Department of Energ) ~mc DATE: AUG 3,9 1994 y$Jf EH-421 (W. A. Yllliams, 427-1719) MA. \tQ SUBJECT: _ Elirinrtion of the Sites froa the Formerly Utilized Sites Remedial Action Program TQ The File In 1990, with the assistance of Hr. Doug Tonkay and Hr. Nlchelle Landis, I reviewed a number of sites that had fomerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recomendations were made to eliminate them from further consideration under Forwrly Utilized Sites Remedial A&Ion Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites l hd to ratify and confim the

249

United States Government  

Broader source: Energy.gov (indexed) [DOE]

DOE:F 1325.8 7 DOE:F 1325.8 7 (08-93) United States Government Department of Energy memorandum DATE: April 10, 2006 REPLY TO ATTN OF: IG-32 (A05AL045) Audit Report Number: OAS-L-06-12 SUBJECT: Audit of Sandia National Laboratories' Safeguards and Security Path Forward Management Plan TO: Associate Administrator for Defense Nuclear Security INTRODUCTION AND OBJECTIVE From 2001 to 2003, approximately 500 security-related findings and observations were identified at Sandia National Laboratories (Sandia) by the Department of Energy's Office of Independent Oversight and Performance Assurance (OA), the National Nuclear Security Administration's (NNSA) Sandia Site Office (SSO), and Sandia's self assessments. Sandia senior management acknowledged the significance of the numerous findings and, in

250

United States Government Memorandum  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy United States Government Memorandum DATE: January 26, 2007 Audit Report Number: OAS-L-07-05 REPLY TO ATTN OF: IG-34 (A06GT035) SUBJECT: Report on "The Department of Energy's Implementation of Revised OMB Circular No. A-123" TO: Acting Chief Financial Officer, CF-1 INTRODUCTION AND OBJECTIVE The Office of Management arid Budget's (OMB) revised Circular No. A-123 (Circular) requires Federal agencies to assess the adequacy of their internal controls. Beginning in Fiscal Year (FY) 2006, the Circular requires agencies to strengthen their assessment, documentation and testing of internal controls over financial reporting and prepare an annual assurance statement on the operating effectiveness of those controls. In August 2005, the Department of Energy's

251

United States Government  

Broader source: Energy.gov (indexed) [DOE]

4 DOE F 1325.8 (08-93) United States Government Department of Energy memorandum DATE: April 23, 2004 Audit Report Number: OAS-L-04-16 REPLY TO ATTN OF: IG-35 (A04YT023) SUBJECT: Audit Report on "Modernization Activities at the Y-12 National Security Complex" TO: Richard Speidel, Director, Policy and Internal Controls Management, NA-66 INTRODUCTION AND OBJECTIVE As part of the National Nuclear Security Administration's (NNSA) nuclear weapons complex, the Y-12 National Security Complex (Y-12) performs critical roles in strengthening national security and reducing the global threat from weapons of mass destruction. The Y-12 modernization plan (plan) seeks to foster the development of a physical plant that is efficient and effective in serving its national security missions. The

252

. United States Government  

Office of Legacy Management (LM)

,:n5.5.8 ,:n5.5.8 ,849, EfG pw, . United States Government DATE: AUG 2 i994 y#J;; EM-421 (W. A. Williams, 427-1719) sUBJECT: -Elimination of the Robbins & Myers Site, Springfield, Ohio 11179 I The File TO: I have reviewed the attached elimination recommendation and the original historical records for the Myers & Robbins facility in Springfield, Ohio. I have determined that there is little likelihood of radioactive contamination at these sites. The only record of activity at this site by Department of Energy predecessors is an equipment test of a pump in March 1975. This test involved limited amounts of radioactive materials and there was a serious effort to decontaminate the equipment at the conclusion of the tests. Based on the above, the Myers & Robbins site in Springfield, Ohio, is

253

United States Government  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 E&M&& +\A .wz United States Government Department of Energy DATE: RUG 3, 9 %g4 y;;;; EM-421 (W. A. W illiaas, 427-1719) "; :+ 1 SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of M r. Doug Tohkay and Ms. M ichelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recomendations were made to eliminate then from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites and to ratify and confirm the

254

Uniter+ States Government  

Office of Legacy Management (LM)

EFG (07-90) EFG (07-90) Uniter+ States Government ~L.aQ-i; Department of Energy inemorandum DATE: SEP 2 5 1992 REPLY TO Al-fN OF: EM-421 (W. A. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Dow Chemical Company Facility in M a d ison, Illinois TO: L. Price, OR The site of the Former Dow Chemical Company in M a d ison, Illinois, which is currently owned and operated by the Spectrulite Consortium, is designated for inclusion in the Formerly Utilized Sites Remedial Action Program (FUSRAP). This designation is based upon the results of a preliminary radiological survey and other information described in the attached Designation Summary. The authority determination and preliminary survey report also are attached for information. The site has been assigned a low priority under the FUSRAP protocol, as

255

United States Government  

Office of Legacy Management (LM)

# Xx i' # Xx i' !325 8 I c&egJw, i&l d, 4 -1 United States Government Department of Energy DATE; AUG 3, 9 !gg4 I REPLYTo m-421 (W. A. Williams, 427-1719) sy I AlTN OF: SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of Mr. Doug Tonkay and Ms. Nichelle Landis, I reviewed a number of sites that had formerly provided goods a&/or services to the Fernald facility as subcontractors. For 24 of these sites, recoumendations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

256

United States Government  

Office of Legacy Management (LM)

EFS (07-W EFS (07-W United States Government memorandukn Department of Energy j ; I.-- ' -i;: /J DATE: j.gjG 2 9 1994 REPLY TO En-421 (W. A. Williams, 427-1719) AlTN OF: h p)\;--/ ;,;' J ( SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of Ur. Doug Tonkay and Us. Michelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recoPraendations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

257

United States Government Memorandum  

Broader source: Energy.gov (indexed) [DOE]

8/16/07 09:15 FAX 301 903 4656 CAPITAL REGION 8/16/07 09:15 FAX 301 903 4656 CAPITAL REGION * 002 DOE F 1325.8 (08-93) Department of Energy United States Government Memorandum DATE: August 15, 2007 Audit Report Number: OAS-L-07-22 REPLY TO ATTN OF: IG-34 (A06GT006) SUBJECT: Report on "Hazardous Chemicals Inventory Management at the Savannah River Site" TO: Manager, Savannah River Operations Office BACKGROUND The Savannah River Site (Savannah River) maintains large inventories of hazardous chemicals for its scientific, environmental cleanup and production operations. Many of these chemicals are known carcinogens; some are corrosive, while others are highly flammable. As such, these chemicals can pose serious health and safety risks to workers and members of the public, the environment, and to emergency first responders if not properly managed and controlled.

258

,. United States Government  

Broader source: Energy.gov (indexed) [DOE]

i. 001 i. 001 DOE F 1325.8 (8-89) EFG (07-90) ,. United States Government Department of Energy memorandum DATE: September 11, 2003 REPLYTO: IG-34 (A03NE045) Audit Report No.: OAS-L-03-20 SUBJECT: Audit of Procurement Administration at the Oak Ridge National Laboratory TO: Director, Office of Management, Budget and Evaluation/Chief Financial Officer, ME-1 The purpose of this report is to inform you of the results of our survey of procurement administration at the Oak Ridge National Laboratory (Laboratory). This review was initiated in May 2003 and fieldwork was conducted through August 2003. Our review methodology is described in an attachment to this report. INTRODUCTION AND OBJECTIVE In Fiscal Year (FY) 2002, the Department of Energy's (Department) management contractors procured approximately $6.4 billion worth of goods and services from

259

United States Government  

Broader source: Energy.gov (indexed) [DOE]

31/07 THU 18:20 FAX 865 241 3897 OIG --- HQ 31/07 THU 18:20 FAX 865 241 3897 OIG --- HQ 00 DOE F 1325.8 (08&93) United States Government Department of Energy memorandum DATE: May 31, 2007 Audit Report Number: OAS-L-07-13 REPLY TO ATTN OF: IG-32 (A07RL048) SUBJECT: Audit of Safety Allegations Related to the Waste Treatment Plant at the Hanford Site TO: Manager, Office of River Protection INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Hanford Site is responsible for treating and preparing 53 million gallons of radioactive and chemically hazardous waste for disposal. Bechtel National, Inc. (Bechtel) is designing, building and commissioning the Waste Treatment Plant (Plant), a category II nuclear facility, which is comprised of a complex of treatment facilities to vitrify and immobilize radioactive waste into a

260

United States Government  

Broader source: Energy.gov (indexed) [DOE]

OEF 1325.8 OEF 1325.8 (U8-93) United States Government Department of Energy memorandum DATE: April 11, 2007 Audit Report Number: OAS-L-07-I1 REPLY TO ATTN OF: IG-32 (A07DN056) SUSJECT: Audit of the Department of Energy's Community and Regulatory Support Funding at the Richland Operations Office TO: Manager, Richland Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Office of Environmental Management provided $60.1 million in Community and Regulatory Support funding in Fiscal Year (FY) 2005 to a number of Departm- nt sites. The funding is intended to be used for activities indirectly related to nuclear and hazardous waste cleanup, such as agreements with state regulatory agencies and transportation departments. During FY 2005, the Department's Richland

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

United States Government  

Broader source: Energy.gov (indexed) [DOE]

a . a . r-z . "*& ., . .. uoi UA o. --.- flI gj UUX DOE F 1325.8 (08.93) United States Government Department of Ene memorandum DATE: August 19, 2004 Audit Report Number: OAS-L-04-18 REPLY TO ATTN OF: IG-36 (A03IF009) SUBJECT: Audit of the "Revised Pit 9 Cleanup Project at the Idaho National Engineering and Environmental Laboratory" TO: Paul Golan, Acting Assistant Secretary, Office of Environmental Management INTRODUCTION AND OBJECTIVE The Idaho National Engineering and Environmental Laboratory's (iNEEL) subsurface disposal area was established in 1952 for disposal of solid radioactive waste and now encompasses an area of approximately 88 acres. Wastes from the INEEL and other Department of Energy (Department) sites, rmost notably Rocky Flats, were buried in

262

United States Government  

Broader source: Energy.gov (indexed) [DOE]

vu & . vu & . ,I / v a L U ; .8 " ',X v &..'*. "o uu V"x Ijo tf J ,*- , , i 4 w i tiJ U U 1 OEF S.a 135 (0B93) United States Government - Department of Energy memorandum DATE: February 27, 2007 REPLY TO Audit Repor Number: OAS-L-07-08 ATTN OF: IG-32 (A06ID015) SUBJECT: Audit of the "Design of the Engineered Barrier System at the Yucca Mountain Site" TO: Principal Deputy Director, Office of Civilian Radioactive Waste Management INTRODUCTION AND OBJECTrVE In accordance with the Nuclear Waste Policy Act of 1982, the Department of Energy's (Department) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for designing, licensing, constructing, and operating a repository, known as Yucca Mountain, for the permanent disposal of spent nuclear fuel and high-level -

263

United States Government  

Broader source: Energy.gov (indexed) [DOE]

F 1325.8 F 1325.8 (08-93) United States Government Department of Energy memorandum DATE: August 13, 2007 . . Audit Report Number: OAS-L-07-18 REPLY TO ATTN OF: IG-32 (A07PR061) SUBJECT: Audit of Executive Compensation at Brookhaven National Laboratory TO: Manager, Brookhaven Site Office INTRODUCTION AND OBJECTIVE As part of a Department of Energy-wide audit of executive compensation, we reviewed executive compensation at the Office of Science's Brookhaven National La --- _ .r . . tc. av .... n . Ou audit covered executive cuupoci'A ;is in curred and claimed for Fiscal Years 2003, 2004, and 2005. Brookhaven Science Associates, LLC, operated Brookhaven under Department of Energy (Department) contract number DE-AC02-98CH10886. The amount of executive compensation that can be reimbursed to Department

264

United States Government  

Broader source: Energy.gov (indexed) [DOE]

')/06 MON 14:28 FAX 423 241 3897 OIG ')/06 MON 14:28 FAX 423 241 3897 OIG --- HQ 1o001 ,O " F 1325.8 (08-93) United States Government Department of Energy memorandum DATE: April 10, 2006 Audit Report No.: OAS-L-06-11 REPLY TO ATTN OF: IG-32 (A05ID043) SUBJECT: Audit of "Contract Transition Activities at the Idaho Operations Office" TO: Manager, Idaho Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy's Idaho Operations Office has ongoing missions focused primarily in the areas of nuclear energy and environmental cleanup. From October 1, 1999 to February 1, 2005, Bechtel BWXT Idaho, LLC (Bechtel) managed facility operations for both of these missions. In Fiscal Year 2005, two separate contracts began in order to add focus and clarity to each respective mission. First, the Idaho National

265

United States Government  

Broader source: Energy.gov (indexed) [DOE]

-93) -93) United States Government Department of Energy memorandum DATE: July 12, 2007 Audit Report Number: OAS-L-07-15 REPLY TO ATnN OF: IG-32 (A07ID055) SUBJECr: Audit of the Idaho National Laboratory Facility Footprint Reduction TO: Manager, Idaho Operations Office INTRODUCTION AND OBJECTTVE On February 1, 2005, Battelle Energy Alliance, LLC (BEA) assumed responsibility for managing and operating the Idaho National Laboratory (INL) for the Department of Energy (Department) under a new 10 year contract. ThI m.ion for ,the L s to nntance the Nation's energy security by becoming the preeminent, internationally recognized nuclear energy research, development, and demonstration laboratory.. To accomplish this mission, BEA proposed aggressive infrastructure initiatives

266

United States Government Departmen  

Broader source: Energy.gov (indexed) [DOE]

7/05 TUE 07:58 FAX 423 241 3897 OIG -** HQ @]002 7/05 TUE 07:58 FAX 423 241 3897 OIG -** HQ @]002 DOE F 1325.8 (08-93) United States Government Departmen of Energy memorandum DATE: December 20, 2005 Audit Report Number: OAS-L-06-03 REPLY TO A1TN OF; IG-36 (A05SR025) SUBJECT: Audit of "Defense Waste Processing Facility Operations at the Savannah River Site" TO: Jeffrey M. Allison, Manager, Savannah River Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Savannah River Site stores approximately 36 million gallons of liquid, high-level radioactive waste in 49 underground waste storage tanks. The contents of the waste tanks are broadly characterized as either "sludge waste" or "salt waste". Sludge waste is insoluble and settles to the bottom of a waste tank, beneath a layer of liquid supernate. Salt

267

* United States Government  

Office of Legacy Management (LM)

-- -- DE;$r,e /q f-j * I3 - I * United States Government memorandum MAY 21 I991 DATE: REPLY TO Al-fN OF: 4ih55YhL Department of Energy JT:,i 5, f&A 0 ' - j4.~, ' -/ jl.a' \ A t -3 __..-_-. EM-421 SUBJECT: Elimination of the American Potash and Chemical Site The File TO: I have reviewed the attached site summary and elimination recommendation for the American Potash and Chemical Company Site in West Hanover, Massachusetts. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the American Potash and Chemical Company site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Alexander Williams, PhD Designation and Certification Manager

268

United States Goveinment  

Office of Legacy Management (LM)

,325.B ,325.B jO8.93) United States Goveinment ~~~rntir-andu~rvi Depr?rtnient of Energy \L, IO' " 1' !ATE:' MAY i o 1995 ,' Kzb9. ":cz$ EM-421 (W.,A. Williams, 301-903-8149) SUBJECT: Records for the West Chicago Site .The File TO: After review.of the available r&rds concerning the former 'Lindsay Light and Chemical.Corhpany site in West Chicago, Illinois. I have determined that it is not necessary to transmit Department of Energy (DOE) records to the municipa,llty to inform public officials of the activities at this ~ site. This site has been licgnsed by the Nuclear Regulatory Commission (NRC) for many.years, and the nature of the. rare'earth and thorium production at the site, are well known. Remediation of this faci'lity ii~ being addressed by the current owner, 'the NRC, the U.S; Environmental

269

; United States Government  

Office of Legacy Management (LM)

Don F 1328.8 Don F 1328.8 . . .449J ' Em wm ; United States Government , % - memorandum L c*m Al.)G 2 9 a34 yz;; EM-421 (If. A. Willlams, 427-1719) lq,iMAL Department of Energy m5 MA, \i& SUBJECT: Elimination of the Sites from the Formerly Utllized Sites Remedial A&Ion Prograa ' a The File In 1990, with the assistance of Hr. Doug Tonkay and Ms. Htchelle L&is, I reviewed a number of sites that had fomerly provided goods and/or services to the Fernald faclllty as subcontractors. For 24 of.these sites, recoarwndations were ude to eliainate thm from further consideratton under Formerly Utilized Sites Reaedial Actlon Progrm (FUSRAP). In each case, I made or revlewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

270

UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

'.... '|le , * f C. '.... '|le , * f C. Office Memorandum · UNITED STATES GOVERNMENT .-- J TO ' Leo Graup, Chief, DATE: September 29, 1958 Property Management Branch rFi0 : M. S. Weinstein Industrial Hygiene Branch, HASL SUBJBT: SURVEY AT HAIST PROPETIY SYMBOL: HSH:MSW. Thisl property was purchased during MED operation and used as a dumping ground for refinery residues generated by Linde Air Products during their period of participation in the refinery operations program. \It 2 consists of 10 acres in addition to a perpetual .ease- ment right to a strip of land, 10 feet wide and 3600 feet long. The area is located in North Tonawanda, New York near the Niagara River. Because of the growth of adjacent industries, this particular piece of property has appreciated in value. During its tenure as responsible property management office, Oak

271

United States Government  

Office of Legacy Management (LM)

OOE F 1325.8 OOE F 1325.8 - EFgzk3) United States Government tiemorandum 0 wt;? -J Department of Energy DATE: SEP 2 5 1992 REPLY TO Al-TN OF: EM-421 (W. A. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at Diamond Magnesium Site in Painesville, Ohio TO: L. Price, OR The former Diamond Magnesium Company site located at 720 Fairport-Nursery Road in Painesville, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The site is owned by Uniroyal Chemical Company and by Lonza Chemical, Incorporated. This designation is based on the results of a radiological survey and conclusions from an authority review as noted in the attached Designation Summary. Copies of the radiological survey reports and the authority

272

United States Government  

Office of Legacy Management (LM)

Z&Et,? y-p . c' Z&Et,? y-p . c' )7q/ I cuq,~ United States Government Department of Energy memoranduin I " . : I ;/ ,I DATE: hufi 2 9 1594 \ ' - y:oTFq M-421 (W. A. Ylllius, 427-1719) ' ii Y - SIJWECT: Elimination of the Sites from the Formerly Utilfzed Sites Remedial Actjon Progru TO The File In 1990, with the assistance of Mr. reviewed a number of sites that had services to the Fernald facility as sites, recommendations were made to ___ _- _ consideration under Formerly Utiltzed Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites and to ratify and confirm the prior elimination of each site froa FUSRAP.

273

United States Government  

Office of Legacy Management (LM)

DOE F t325.8 DOE F t325.8 (s8s) Dl? l 36-z EFG (07-90) United States Government m e m o randum Department of Energy DATE: LUG 2 ' 3 1394 ",cl,'," EM-421 (W. A. W illiams, 427-1719) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of M r. Doug Tonkay and Ms. M ichelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of these sites, recoamnendations were aade to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

274

- United States Government  

Office of Legacy Management (LM)

8 8 my EFG (07.90) . - United States Government . * Department of. Energy * inemorandum DATE: DEC :! ;j 1993 REPLY TO ATTN OF: EM-421 (W.'A. W illiams, 903-8149) : NY 41 I .' 41 G I? SUBJECT: Elimination of the T itanium Alloy Manufacturing Co., Niagara Falls, New York TO: The F ile I have reviewed the attached site. summary and elimination recommendation for the T itanium Alloy Manufacturing Company. I have determined that the potential for radiological contamination is low because of the lim ited duration of the activities at the site. Further, at least some of the contractual activities at the site were licensed under the Atomic Energy Act, and the licensed activities are thereby disqualified from further consideration under the Department of Energy's Formerly Utilized Sites

275

United States Government  

Office of Legacy Management (LM)

UOEF 1325.8 UOEF 1325.8 (5831 , - a.. L . . L. . c ,, . . . t ,' <, .* -,. .--1^ a "-2 (J 7 , pe-;L, United States Government memorandum Departmen: of Energy DATEAUG 1 0 1984 REPLY TO Al-fN OF: NE-20 SUBJECT: Action Description Memorandum (ADM) Review: Wayne, New Jersey Proposed 1984 Remedial Actions at TO: File After reviewing all of the pertinent facts including the attached Action Description Memorandum (ADM), I have determined that the remedial action described in the subject ADM is an action which in and of itself will have a clearly insignificant impact on the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA), 42 U.S.C. 4321 et seq. The Conference Report accompanying the Energy and Water Appropriation Act

276

United States Government  

Office of Legacy Management (LM)

I8 891 I8 891 EFG (07.90) United States Government m e m o randum bepartrne% of Energy -P ' ; N. A *I Pi id : DATE: AUG 3, 9 1994 REPLY TO Al-iN OF: EM-421 (W. A. W illiams, 427-1719) r, )' \, ! c ' d, ' t ' 3 ' 2 -L SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of M r. Doug Tonlsay and Ms. M ichelle Landis, I reviewed a nmber of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recommdations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

277

United States Government  

Office of Legacy Management (LM)

81278 81278 United States Government Department of Energy memorandum - ?71 S.EP 23 F; i: 54 DATE: SEP 1 8 1991 REPLY TO ATTNOF: EM-421 (P. Blom, 3-8148) SUBJECT: Approved Categorical Exclusion for Removal Actions at Elza Gate, Tennessee TO: Lester K. Price, OR Attached is a copy of the approved Categorical Exclusion (CX) for removal of contaminated material at the Elza Gate site in Tennessee. The removal action involves the removal of radioactive contaminated soil and concrete as well as the removal of Polychlorinated Biphenyl (PCB) contaminated soil. This CX was approved by Carol Borgstrom, Office of National Environmental Policy Act Oversight (EH-25), September 9, 1991. Paul F. Blom Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration

278

United States Government  

Office of Legacy Management (LM)

DOEF1325.8 P4 0 * 1 - 1 DOEF1325.8 P4 0 * 1 - 1 - Iq \ b- United States Government memorandum pJ .T\ \b Department of Energy DATE: OCT 9 1984 REPLY TO NE-20 All-N OF: .- Authorizations for Actions Under the Formerly Utilized Sites Remedial Action SUBJECT: Program (FUSRAP) at the St. Louis Airport Storage Site, St. Louis, MO. and the W. R. Grace Site at Curtis Bay, Md. To: J. LaGrone, Manager Oak Ridge Operations Office St. Louis Airport Storage Site, MO The House and Senate Reports for the Energy and Water Development Appropriation Act (P.L. 98-360) directed the Department of Energy "...to take the necessary steps to consolidate and dispose of the waste material from the Latty Avenue site and nearby St. Louis Airport vicinity properties locally, by reacquiring, stabilizing, and using the old 21.7

279

United States Government  

Office of Legacy Management (LM)

ooc F r325.8 ooc F r325.8 imo, EFO ,ww United States Government memorandum Department of Energy -fw?w 81ua DATE: FEB 1 5 1991 l+Ks6 sUsJECT: Elimination of the Buflovak Company Site from FUSRAP ho: The File I have reiiewed the attached preliminary site summary and recommendation for the Buflovak Company site in Buffalo, New York. I have determined that there is little likelihood of contamination at this site. Based on the above, the Buflovak Company site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Alexander Williams Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment - I . b e e : W e s to n E M - 4 0 ( 3 ) E M - 4 2 ( 2 ) W illiams r

280

United States Attorney General  

Broader source: Energy.gov (indexed) [DOE]

93, 5 U.S. Op. Off. Legal Counsel 1, 1981 WL 30865 (U.S.A.G.) 93, 5 U.S. Op. Off. Legal Counsel 1, 1981 WL 30865 (U.S.A.G.) United States Attorney General ***1 *293 January 16, 1981 **1 The President The White House Washington, D.C. 20500 MY DEAR MR. PRESIDENT: You have asked my opinion concerning the scope of currently existing legal and constitutional authorities for the continuance of government functions during a temporary lapse in appropriations, such as the Government sustained on October 1, 1980. As you know, some initial determination concerning the extent of these authorities had to be made in the waning hours of the last fiscal year in order to avoid extreme administrative confusion that might have arisen from Congress' failure timely to enact 11 of the 13 anticipated regular appropriations bills, FN;B1[FN1]FN;F1 or a

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

United States Government  

Broader source: Energy.gov (indexed) [DOE]

3/02 TUE 08:59 FAX 423 241 3897 OIG *-* HQ 00o2 3/02 TUE 08:59 FAX 423 241 3897 OIG *-* HQ 00o2 DOE F 132,.8 W.I: ((07.9u) United States Government Department of Energy Memorandum DATE: December 2, 2002 REPLY TO REPLY TO -36 (A02SR013) Audit Report No.: OAS-L-03-07 ATTN OF: SUBJECT: Audit of Subcontracting Practices at the Savannah River Site TO: Jeffrey M. Allison, Acting Manager, Savannah River Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy (Department) has contracted with Westinghouse Savannah River Company, LLC (Westinghouse) to manage and operate the Savannah River Site (Savannah River) through September 30, 2006. As of August 2, 2002, Westinghouse had 534 open and active service procurements worth $100,000 or more each, with a total value of about $518 million, that it had awarded since October 1996.

282

United States Goverment  

Broader source: Energy.gov (indexed) [DOE]

6/03 15:37 FAX 301 903 4656 _ CAPITAL REGION * FORS FIVEA 91002/004 6/03 15:37 FAX 301 903 4656 _ CAPITAL REGION * FORS FIVEA 91002/004 DOE-F 1325.8 (68-93) Depament of Energy United States Goverment Department of Energy Memorandum OFFICE OF .NSPECTOR GENERAL DATE: February 26, 2003 REPLY TO ATTN OF: IG-34 (A02CG004) Audit Report No.: OAS-L-03-11 SUBJECT: Audit of the Office of Science Infrastructure Modernization Initiatives TO: Acting Associate Director, Office of Laboratory Operations and Environment, Safety and Health, SC-80 The purpose of this report is to inform you of the results of our audit of the Office of Science's infrastructure modernization initiatives. The audit was performed between May and September 2002 at Departmental Headquarters, Brookhaven National Laboratory, and Argonne National Laboratory. The audit methodology is described in

283

United States Government  

Broader source: Energy.gov (indexed) [DOE]

w w f.b wr w f k--w .^^- - w w f.b wr w f k--w .^^- - - r - T- - * -* p -ldt - f f - - -J -vv- A n JV DOE F 1325.8 (08-93) United States Government ------- Department of Energy memorandum DATE: June 15, 2006 REPLY TO Audit Report Number: OAS-L-06-15 ATTN OF: IG-32 (A05SR029) SUBJECT Audit of "Storage Capacity of the Iligh Level Waste Tanks at the Savannah River TO: Manager, Savannah River Operations Office INTRODUCTION AND OBJECTIVE The Savannah River Site in South Carolina currently stores about 36 million gallons of waste in 49 active underground storag,* .ks. Twenty-two of these .anks do not meet Environmcntal Protection A&-.y (EPA) requirements ybr full secondary containment and must be emptied and closed by 2022 in accordance with a closure schedule approved by the EPA and the 5oith Carolina Department

284

United States Government  

Broader source: Energy.gov (indexed) [DOE]

0/02 WED 09:58 FAX 423 241 3897 OIG 0/02 WED 09:58 FAX 423 241 3897 OIG -.- +-+ HQ ]002 rFG (07-;1) United States Government Department of Energy Memorandum DATE: October 29, 2002 REPLY TO 1G-36 (A02DN028) Audit Report No.: OAS-L-03-01 ATTN OF; SUBJECT: Audit of Procurement at the Rocky Flats Environmental Technology Site TO: Eugene Schmitt, Manager, Rocky Flats Field Office ' INTRODUCTION AND OBJECTIVE The Department of Energy (Department) and its site contractor, Kaiser-Hill Company, LLC (Kaiser-Hill), contracted in January 2000 to close the Rocky Flats Environmental Technology Site (Rocky Flats) by a target date of December'15, 2006. As of May 2002, Kaiser-Hill had awarded 784 procurements worth more than $25,000 each, with a total value of about $368.6 million, to support the complex activities required for site closure.

285

United States Government  

Broader source: Energy.gov (indexed) [DOE]

uV,./ J.r./ i L .. * i. uV,./ J.r./ i L .. * i. 0 r '± J o ,. NL . Jurt -. rur.mO rI[ V Jg, ]VJUU"/UU4 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum OFFICE OF INSPECTOR GENERAL DATE: January 10, 2006 REPLY TO ATTN OF: IG-34 (A06GT029) Audit Report No.: OAS-L-06-06 SUBJECT: Review of the Independent Auditor's Report on The Institute for Genomic Research for the Year Ending December 31, 2004 * TO: Manager, Chicago Office INTRODUCTION AND OBJECTIVE The Institute for Genomic Research (Institute) in Rockville, Maryland is a not-for- profit center that studies areas such as plant, microbial and mammalian genomics. The Institute receives funding from seven Federal agencies to advance its research and development. As required by the Office of Management and Budget (0MB)

286

Working With FEERC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mechanisms For Partnering Mechanisms For Partnering with the Fuels, Engines, and Emissions Research Center at the Oak Ridge National Laboratory Oak Ridge National Laboratory (ORNL) has a program designed to provide technology-based solutions to organizations ranging from startups to Fortune 100 companies to academic institutions. Underlying this philosophy is our belief that strong partnerships with U.S. industry are the best way to share technological know-how with the private sector. Regardless of the activity-entering into a Cooperative Research and Development Agreement (CRADA) or Work for Others (WFO) agreement, or interacting with an industry or university through other means-we are committed to outcomes that create beneficial opportunities for the external organization as well as

287

End of Month Working  

Gasoline and Diesel Fuel Update (EIA)

The level of gas in storage at the end of the last heating season (March The level of gas in storage at the end of the last heating season (March 31, 2000) was 1,150 billion cubic feet (Bcf), just above the 1995-1999 average of 1,139 Bcf. Underground working gas storage levels are currently about 8-9 percent below year-ago levels. In large part, this is because injection rates since April 1 have been below average. Storage injections picked up recently due to warm weather in the last half of October. The month of November is generally the last month available in the year for injections into storage. A cold November would curtail net injections into storage. If net injections continue at average levels this winter, we project that storage levels will be low all winter, reaching a level of 818 Bcf at the end of March, the lowest level since 1996

288

Work Force Restructuring Activities  

Broader source: Energy.gov (indexed) [DOE]

Force Restructuring Activities Force Restructuring Activities December 10, 2008 Note: Current updates are in bold # Planned Site/Contractor HQ Approved Separations Status General * LM has finalized the compilation of contractor management team separation data for the end of FY07 actuals and end of FY08 and FY09 projections. LM has submitted to Congress the FY 2007 Annual Report on contractor work force restructuring activities. The report has been posted to the LM website. *LM conducted a DOE complex-wide data call to the Field and Operations offices for DOE Contractor Management teams to provide, by program, actual contractor separation data for the end of FY 2008 and projections for the end of FY 2009 and FY 2010. The data will be used to keep senior management informed of upcoming large WFR actions.

289

Statement of Work  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-SOL-0003174 1 FOR OFFICIAL USE ONLY - SOURCE SELECTION SENSITIVE, SEE FAR 3.104-3 PERFORMANCE WORK STATEMENT (PWS) Emergency Operations Training Academy (EOTA) Support Services May 27, 2011 Draft 1.0 Introduction The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), Office of Emergency Operations (NA-40) requires support services in the development and delivery of training, exercises, and other related technical and administrative support services at the Emergency Operations Training Academy (EOTA) in Albuquerque, New Mexico. 2.0 Background NA-40's mission is to ensure that capabilities are in place to respond to any NNSA and DOE facility emergency. NA-40 is the nation's premier responder to any nuclear or radiological

290

How NIF Works  

SciTech Connect (OSTI)

The National Ignition Facility, located at Lawrence Livermore National Laboratory, is the world's largest laser system... 192 huge laser beams in a massive building, all focused down at the last moment at a 2 millimeter ball containing frozen hydrogen gas. The goal is to achieve fusion... getting more energy out than was used to create it. It's never been done before under controlled conditions, just in nuclear weapons and in stars. We expect to do it within the next 2-3 years. The purpose is threefold: to create an almost limitless supply of safe, carbon-free, proliferation-free electricity; examine new regimes of astrophysics as well as basic science; and study the inner-workings of the U.S. stockpile of nuclear weapons to ensure they remain safe, secure and reliable without the need for underground testing. More information about NIF can be found at:

2009-07-30T23:59:59.000Z

291

Working Group Report: Sensors  

SciTech Connect (OSTI)

Sensors play a key role in detecting both charged particles and photons for all three frontiers in Particle Physics. The signals from an individual sensor that can be used include ionization deposited, phonons created, or light emitted from excitations of the material. The individual sensors are then typically arrayed for detection of individual particles or groups of particles. Mounting of new, ever higher performance experiments, often depend on advances in sensors in a range of performance characteristics. These performance metrics can include position resolution for passing particles, time resolution on particles impacting the sensor, and overall rate capabilities. In addition the feasible detector area and cost frequently provides a limit to what can be built and therefore is often another area where improvements are important. Finally, radiation tolerance is becoming a requirement in a broad array of devices. We present a status report on a broad category of sensors, including challenges for the future and work in progress to solve those challenges.

Artuso, M.; et al.,

2013-10-18T23:59:59.000Z

292

How NIF Works  

ScienceCinema (OSTI)

The National Ignition Facility, located at Lawrence Livermore National Laboratory, is the world's largest laser system... 192 huge laser beams in a massive building, all focused down at the last moment at a 2 millimeter ball containing frozen hydrogen gas. The goal is to achieve fusion... getting more energy out than was used to create it. It's never been done before under controlled conditions, just in nuclear weapons and in stars. We expect to do it within the next 2-3 years. The purpose is threefold: to create an almost limitless supply of safe, carbon-free, proliferation-free electricity; examine new regimes of astrophysics as well as basic science; and study the inner-workings of the U.S. stockpile of nuclear weapons to ensure they remain safe, secure and reliable without the need for underground testing. More information about NIF can be found at:

None

2010-09-01T23:59:59.000Z

293

TRU TeamWorks  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8, 2012 8, 2012 WIPP Quick Facts (As of 9-26-12) 10,849 Shipments received since opening (10,252 CH and 597 RH) 83,693 Cubic meters of waste disposed (82,394 CH and 299 RH) 162,472 Containers disposed in the underground (161,882 CH and 590 RH) Photo above right: CBFO Deputy Manager Ed Ziemianski presents a WIPP team with the Green Zia Program Silver Level Award from the New Mexico Environment Department on Aug. 15, 2012 in recognition of environmental initiatives. Shown right of Ziemianski is Farok Sharif, WTS President and General Manager. New WIPP Management and Operating Contractor to start October 1 Nuclear Waste Partnership LLC (NWP) will start work as the WIPP Management and Operating Contractor on Monday, October 1. WIPP receives Green Zia Award The Waste Isolation Pilot Plant (WIPP), the U.S. Department of Energy (DOE)

294

United States Government  

Broader source: Energy.gov (indexed) [DOE]

memorandum memorandum DATE: April 9, 2004 Audit Report Number: OAS-L-04-13 REPLY TO ATTN OF: IG-35 (A04DC009) SUBJECT: Audit Report on "Reimbursable Work for the Department of Homeland Security" TO: Administrator, National Nuclear Security Administration, NA-1 INTRODUCTION AND OBJECTIVE The Homeland Security Act of 2002 authorizes the Department of Homeland Security (Homeland Security) to utilize the capabilities of the Department of Energy's (Department) laboratories and other sites to carry out Homeland Security's missions. The Act further provides that the Department may accept and perform work for Homeland Security on an equal basis with other Departmental laboratory and/or site missions and that Homeland Security will reimburse the Department in an amount comparable to

295

Beowawe Bottoming Binary Unit - Final Technical Report for EE0002856  

SciTech Connect (OSTI)

This binary plant is the first high-output refrigeration based waste heat recovery cycle in the industry. Its working fluid is environmentally friendly and as such, the permits that would be required with a butane based cycle are not necessary. The unit is modularized, meaning that the unit’s individual skids were assembled in another location and were shipped via truck to the plant site. This project proves the technical feasibility of using low temperature brine The development of the unit led to the realization of low temperature, high output, and environmentally friendly heat recovery systems through domestic research and engineering. The project generates additional renewable energy for Nevada, resulting in cleaner air and reduced carbon dioxide emissions. Royalty and tax payments to governmental agencies will increase, resulting in reduced financial pressure on local entities. The major components of the unit were sourced from American companies, resulting in increased economic activity throughout the country.

McDonald, Dale Edward

2013-02-12T23:59:59.000Z

296

Final Report: Fan Filter Unit Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

61684 61684 Demonstration of Advanced Filtration Technologies: Developing Energy-rebate Criteria through Performing Standard Laboratory Tests and Statistical Analyses Final Report (LBNL- 61684) To California Energy Commission 2007 Tengfang Xu and Duo Wang 2 Disclaimer This document was prepared as an account of work sponsored by the United States Government and California Energy Commission. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor California Energy Commission, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or

297

Renewable Electricity Futures for the United States  

SciTech Connect (OSTI)

This paper highlights the key results from the Renewable Electricity (RE) Futures Study. It is a detailed consideration of renewable electricity in the United States. The paper focuses on technical issues related to the operability of the U. S. electricity grid and provides initial answers to important questions about the integration of high penetrations of renewable electricity technologies from a national perspective. The results indicate that the future U. S. electricity system that is largely powered by renewable sources is possible and the further work is warranted to investigate this clean generation pathway. The central conclusion of the analysis is that renewable electricity generation from technologies that are commercially available today, in combination with a more flexible electric system, is more than adequate to supply 80% of the total U. S. electricity generation in 2050 while meeting electricity demand on an hourly basis in every region of the United States.

Mai, Trieu; Hand, Maureen; Baldwin, Sam F.; Wiser , Ryan; Brinkman, G.; Denholm, Paul; Arent, Doug; Porro, Gian; Sandor, Debra; Hostick, Donna J.; Milligan, Michael; DeMeo, Ed; Bazilian, Morgan

2014-04-14T23:59:59.000Z

298

Next Generation Rooftop Unit | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Generation Rooftop Unit A typical commercial rooftop air-conditioning unit (RTU) Credit: Oak Ridge National Lab A typical commercial rooftop air-conditioning unit (RTU) Credit:...

299

UNIT NUMBER SWMU 175 UNIT NAME: Concrete Rubble Pile (28...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

75 UNIT NAME: Concrete Rubble Pile (28) REGULATORY STATUS: AOC LOCATION: Outside Security Fence, East of C-360 Building in KPDES Outfall Ditch 002. APPROXIMATE DIMENSIONS: 400 ft...

300

CONVERT 15 WELLS TO BORS PUMPING UNITS AND TEST/COMPARE TO CONVENTIONAL UNITS  

SciTech Connect (OSTI)

A new type of fluid lifting equipment called Balanced Oil Recovery System (trade named BORS Lift{trademark}) was installed on several idle oil wells to demonstrate the operating efficiency of this innovative equipment technology. The BORS Lift system is designed to bring oil to the surface without the accompanying formation water. The BORS Lift system uses an innovative strap mechanism that takes oil from the top of the downhole oilwater column and lifts it to the surface, eliminating production of the formation water. Eliminating salt water production could potentially increase oil production, reduce operational costs, benefit the environment, and cut salt water disposal costs. Although the BORS Lift units did not function as intended, lessons learned during the course of the field demonstration project resulted in improvements in the technology and redesign of subsequent generation BORS Lift units which are reported to have significantly improved their performance characteristics. BORS Lift units were installed on 15 temporarily abandoned wells which had been shut down due to low oil production, high water production, and uneconomic operating conditions. The wells had been producing with artificial lift at a high watercut from a shallow (850-900 feet), pressure depleted oil sand reservoir prior to being shut down. The electrical motor driven BORS Lift units provided a possible approach for economically returning the shallow, low-volume oil wells to production. The BORS Lift units used in this field demonstration were designed to recover up to roughly 22 barrels of fluid per day from depths ranging to 1,700 feet, ideal for many marginal stripper well operations. The BORS units were first-production-model test units, operated under oil field conditions for the first time, and were naturally expected to experience some design problems. From the onset, the operator experienced mechanical, design, and operational problems with the BORS Lift units and was unable to maintain un-interrupted production operations. The inventor provided considerable on-site technical support in an ongoing effort to correct the problems with the units and the inventor worked extensively with the operator to make design and manufacturing changes to the units to try to improve their reliability and performance. The operational problems were mostly related to the durability of the various components under oil field operating conditions such as inadequate mechanical, electrical, and electronic design for rough service, extended operation, and severe weather conditions. During the course of the demonstration project, it further appeared that the producing formation lacked sufficient reservoir energy and/or favorable oil properties to mobilize and displace oil from the formation into the well bore in order to recharge the oil column in the well. The BORS Lift units were then moved to a second lease which appeared to have more favorable WTI quality oil properties. Eight of these units were reported to have been installed and placed in operation on the second lease, however, operational difficulties continued. It was determined that the units were inadequately designed and would need to be replace by improved second generation units. Due to the lack of success with the first generation units and the extra cost to replace them with the redesigned units, the operators decided not to continue with the project and the project was terminated at that point.

Walter B. North

2003-02-04T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Will NIF Work  

E-Print Network [OSTI]

It is vital that new clean and abundant sources of energy be developed for the sustainability of modern society. Nuclear fusion of the hydrogen isotopes deuterium and tritium, if successful, might make a major contribution toward satisfying this need. The U.S. has an important effort aimed at achieving practical inertial confinement fusion, ICF, which has been under development for decades at the Lawrence Livermore National Laboratory. The National Ignition Facility (NIF) is a giant laser to multiply-shock and thus quasi-isentropically compress a capsule of deuterium-tritium (DT) to high density and temperature, where the fusion rate is proportional to density squared times temperature to the fourth power. The principal problem that must be solved for NIF to work successfully is elimination of the Rayleigh-Tailor (R-T) instability that originates from the interface between the solid shell and the DT fuel within it. The R-T instability poisons the fusion reaction by reducing the temperature of the DT achieved ...

Nellis, W J

2009-01-01T23:59:59.000Z

302

Second United Nations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

i' i' Second United Nations t Jnternational Conference 1 , of Atomic Energy on the Peaceful Uses 4 i \ Confidential until official release during Conference ORIGINAL: ENGLISH METHODS O F PARTICLE DETECTION FOR HIGH-ENERGY PHYSICS EXPERIMENTS t * H. B r a d n e r and D. A. Glaser - INTRODUCTION J 1 % c Recent advances in our knowledge of t h e phenomena of high-energy physics and o'f the e l e m e n t a r y p a r t i c l e s h a s r e s u l t e d f r o m rapid advances in the technology of p a r t i c l e a c c e l e r a t o r s and the art of p a r t i c l e detection. cl'asses: (1) the "track-imaging" device in which one s e e s o r photographs t r a c k s which coincide with the a c t u a l path taken by the p a r t i c l e s , and ( 2 ) counting d e - v i c e s which give only an indication that the p a r t i c l e s p a s s somewhere in the

303

United States Government  

Broader source: Energy.gov (indexed) [DOE]

uq/Uu.3/uo U-L:i ' rAA OuL a uo oUu. 0tri.l± i m,.i,*, u". run.' r.yrcir V e.u uq/Uu.3/uo U-L:i ' rAA OuL a uo oUu. 0tri.l± i m,.i,*, u". run.' r.yrcir V e.u O000DOE F 1325.8 (08-93) Department of Energy United States Government Department of Energy Memorandum OFFICE OF INSPECTOR GENERAL DATE: March 31,2006 REPLY TO ATTN OF: IG-34 (A05TG028) Audit Report No.: OAS-L-06-10 SUBJECT: Report on Audit of "The Department's Information Technology Capital Planning and Investment Control Process" TO: Chief Information Officer, IM-1 INTRODUCTION AND OBJECTIVE Federal guidance requires that Agencies develop and implement capital planning and investment control (CPIC) processes to help ensure that their major information technology investments achieve intended outcomes, represent the best allocation of resources, and reach strategic goals and objectives. The Department of Energy

304

United States Government  

Broader source: Energy.gov (indexed) [DOE]

2/04 THU 14:52 FAX 423 241 3897 OIG -**- HQ l015 2/04 THU 14:52 FAX 423 241 3897 OIG -**- HQ l015 ol: Fi 13 5.8 (8-09) ÂŁ1*G (in'mi^)) United States Government Department of Energy Memorandum DATE: April. 22, 2004 REPLY TO ATTN OF: T -36 (A04RL018) Audit Report No.: OAS-L-04-15 SUBJECT: Audit of Disposition of Excess Facilities at the Hanford Site TO: Keith A. Klein, Manager, Richland Operations Office INTRODUCTION AND OBJECTIVE The Hanford Site (Hanford) is the largest of the three original defense production sites founded during World War II. Between 1943 and 1963, nine plutonium production reactors were built along the Columbia River and five processing facilities were built on the site's Central Plateau, with about 1,000 support facilities. Currently, Hanford has a total of 1,500 facilities of which an estimated 1,000 are excess to current and future mission

305

United States Goverment  

Broader source: Energy.gov (indexed) [DOE]

UO/J±0ou4 TcdJ ± O:S'. Aa. ou* o *.I. I 01j ' . UO/J±0ou4 TcdJ ± O:S'. Aa. ou* o *.I. I 01j ' . - - 00E F 1325,8 (08-93) United States Goverment Department of Energy memorandum DATE: August 13, 2007 Audit Report Number: OAS-L-07-19 REPLY TO ATTN OF: IG-32 (A07PR059) SUBJECT: Audit of Executive Compensation at Selected Office of Science Sites TO: Chief Operating, Officer, Office of Science INTRODUCTION AND OBJECTIVE As part of a Department of Energy-wide audit of executive compensation, we reviewed seven Office of Science sites. Specifically, we reviewed executive compensation costs incurred ~,r claim~.- fr- F".*l*- Y. rs 2003, 2 , and 2005 at - Argonne National Laboratory (Argonne), Brookhaven National Laboratory (Brookhaven), Lawrence Berkeley National Laboratory (LBNL), Oak Ridge Institute for Science and Education, Oak Ridge National Laboratory, Princeton Plasma Physics

306

United States Government Department  

Broader source: Energy.gov (indexed) [DOE]

1/03 07:45 FAX 301 903 4656 CAPITAL REGION -* FORS FIVEA I002/004 1/03 07:45 FAX 301 903 4656 CAPITAL REGION -* FORS FIVEA I002/004 DOE F 1325 ' (8-69) EFO (07-90) United States Government Department of Eneray memorandum DATE: PR17 2003 Audit Report No.: OAS-L-03-14 REPLY TO ATTN OF: IG-34 (A03PT040) SUBJECT: Audit of the Office of Energy Efficiency and Renewable Energy's (EE) Grants, Subsidies, and Cost Sharing Arrangements TO: Assistant Secretary for Energy Efficiency and Renewable Energy, EE-1 The purpose of this report is to inform you of the results of our review of the Office of Energy Efficiency and Renewable Energy's (EE) incentive payments and cost-share arrangements. The review was initiated in February 2003, and fieldwork was conducted through April 2003 at Department of Energy (Department) Headquarters. Our methodology is described in the attachment to this report.

307

Aerial Work Platform Safety Program  

E-Print Network [OSTI]

Aerial Work Platform Safety Program Updated: July 22, 2013 #12;Aerial Work Platform Safety Program ..........................................................................................................11 #12;Aerial Work Platform Safety Program 1 The official version of this information will only for establishing and maintaining the Aerial Work Platform Safety Program. Appropriate safety equipment (e

Holland, Jeffrey

308

Video Shoot Scope of Work  

Broader source: Energy.gov [DOE]

Video Shoot Scope of Work, from the Tool Kit Framework: Small Town University Energy Program (STEP).

309

High Temperature Membrane Working Group  

Broader source: Energy.gov [DOE]

This presentation provides an overview of the High Temperature Membrane Working Group Meeting in May 2007.

310

ARM - Engineering Work Request & Engineering Work Order Guidelines  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Work Request & Engineering Work Request & Engineering Work Order Guidelines Page Contents: Introduction Discussion of the ARM Climate Research Facility Engineering Process: The Engineering Change Request (ECR) and the Engineering Change Order (ECO) Operations and Engineering Task Consulting: The Engineering Work Request (EWR) and the Engineering Work Order (EWO) Relationship of the ECR/ECO and EWR/EWO to the Engineering Task Tracking Tool Relationship of the ECR/ECO and EWR/EWO to the Existing Configuration Control Process in the ARM Climate Research Facility(PIF/CAR, PRR, ORR, and BCR) Glossary Frequently Asked Questions (PDF, 173K) Engineering Work Request & Engineering Work Order Guidelines Process Guidelines for the Engineering Change Request/Engineering Change Order and Engineering Work Request/Engineering Work Order

311

Unit Process Library | netl.doe.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Unit Process Library LCA Projects Models-Tools Presentations Unit Process Library A unit process is the smallest building block in a life cycle model. Each unit process contains...

312

Implementation of the El Mar (Delaware) Unit CO2 flood  

SciTech Connect (OSTI)

Union Royalty, Inc., Amoco Production Company, and Enron Liquids Pipeline Company recently announced that they have commenced operations of an innovative enhanced oil recovery project at the El Mar (Delaware) Unit in Loving County, Texas, about 100 miles west of Midland, Texas. The project will convert the unit`s existing oil recovery system from a secondary (waterflood) system to a tertiary (CO2 flood) system designed to use carbon dioxide and water to increase crude oil production from the unit. What makes this EOR project unique is the creative deal structured by the partners involved. Amoco, Union Royalty, and Enron have worked out an unprecedented arrangement whereby Amoco essentially trades CO2 for an interest in Union Royalty`s future oil production from the unit. By pioneering this innovative deal new production life has been restored to a field that otherwise might dry up. Enron is participating in the project by transporting CO2 to the unit via a 40-mile expansion of its Central Basin Pipeline system from the Dollarhide oil field in Andrews county, Texas. The project will be implemented in four phases. The first phase in operation today comprises seven CO2 injection wells which have begun to process the reservoir with CO2. Plans now call for more CO2 injectors to be installed during the next three to five years until a total of 65 CO2 injectors and an on-site CO2 compression facility serve the unit`s 70 production wells.

McKnight, T.N. Jr. [Union Royalty, Inc., Midland, TX (United States); Merchant, D.L.

1995-12-31T23:59:59.000Z

313

Radiation Safety Work Control Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Radiation Safety Work Control Form Radiation Safety Work Control Form (see instructions on pg-2) Rev July-2012 Area: Form #: Date: Preliminary Applicability Screen: (a) Will closing the beam line injection stoppers mitigate the radiological hazards introduced by the proposed work? Yes No (b) Can the closed state of the beam line injection stoppers be assured during the proposed work (ie., work does NOT involve injection stoppers or associated HPS)? Yes No If the answers to both questions are yes, the work can be performed safely under an SSRL RSWCF. If the answer to either question is no, then the work must be performed under a SPEAR3 RSWCF. Section 1: Description of work to be done, including date and time. (Person Responsible completes section)

314

Who Works for NIF & PS?  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

about Who Works for NIF & PS? The National Ignition Facility is the product of thousands of hours of work by some of the world's most creative and visionary scientists, engineers...

315

Coping with Hot Work Environments  

E-Print Network [OSTI]

E-340 04/05 Many Texans work under hot, humid conditions. Summer heat is a particular hazard to agricultural pro- ducers who work long hours under the sun. However, other people working in hot yards, gardens, kitchens or industry jobs are also... evaporation. Wiping sweat from the skin with a cloth also prevents cooling from evaporation. In hot, humid conditions, hard work becomes harder. The sweat glands release moisture and essential David W. Smith, Extension Safety Program The Texas A&M...

Smith, David

2005-04-28T23:59:59.000Z

316

U.S. and India hold the Third Meeting of the Indo-United States Civil  

Broader source: Energy.gov (indexed) [DOE]

and India hold the Third Meeting of the Indo-United States and India hold the Third Meeting of the Indo-United States Civil Nuclear Energy Working Group U.S. and India hold the Third Meeting of the Indo-United States Civil Nuclear Energy Working Group March 17, 2010 - 12:54pm Addthis India hosted the third meeting of the Indo-United States Civil Nuclear Energy Working Group in Mumbai, on Feb. 3-4, 2010. Civil nuclear is one of five working groups established under the Energy Dialogue as a result of the 2005 Joint Statement issued by then President Bush and Prime Minister Singh. The Working Group first met in 2006 and held its second meeting after the U.S. and Indian governments completed the Indo-U.S. Civil Nuclear Cooperation Agreement. The Agreement, signed in October 2008, aims to provide new opportunities for trade and job creation for both economies; to

317

Water Resources Working Group Report  

E-Print Network [OSTI]

Water Resources Working Group Report This report provided content for the Wisconsin Initiative in February 2011. #12;Water Resources Working Group Wisconsin Initiative on Climate Change Impacts October 2010 #12;Water Resources Working Group Members ­ WICCI Tim Asplund (Co-Chair) - Wisconsin Department

Sheridan, Jennifer

318

National Primary Special Standard for the Units of Energy, Energy Density Distribution, Pulse Duration, and Wavelength of Laser Radiation  

Science Journals Connector (OSTI)

The working standards are, as a rule, located in metrological centers and are used directly for calibration and verification of working means of measurement that are in operation. Transfer of the units of energy,...

K. Sh. Abdrakhmanov; A. A. Liberman; S. A. Moskalyuk…

2014-03-01T23:59:59.000Z

319

Corrective Action Management Units and Temporary Units. RCRA Information Brief  

SciTech Connect (OSTI)

On February 16, 1993 the EPA published a final rule that allows either the EPA Regional Administrator or the authorized State to designate areas as corrective action management units (CAMUs) at hazardous waste management facilities for the specific purpose of managing remediation waste that has been generated as part of the facility`s corrective action activities. According to the rule, placement of remediation wastes into or within a CAMU does not constitute land disposal of hazardous waste and is not subject to RCRA land disposal restrictions. In addition, waste disposal units located within CAMUs are not required to be designed in accordance with RCRA minimum technological requirements applicable to land disposal units. This Information Brief explains the advantages of a CAMU designation, defines a Temporary Unit (TU) and explains the advantages of a TU designation. The process for initiating a CAMU or TU designation is described for DOE sites and interim status facilities.

Not Available

1994-03-01T23:59:59.000Z

320

NRC allows TVA to resume construction on unit 1  

SciTech Connect (OSTI)

The article very briefly describes the construction status of the Tennessee Valley Authority (TVA) Watts Bar Nuclear Plant unit 1. The project was halted by TVA for two years due to quality assurance issues. The US Nuclear Regulatory Commission approved resumption of work, noting that corrective actions were adequate. The status of other TVA reactors is also noted.

NONE

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

United Nations Economic and Social Council | Open Energy Information  

Open Energy Info (EERE)

Council Council Jump to: navigation, search Name United Nations Economic and Social Council Website http://www.un.org/en/ecosoc/in References United Nations Economic and Social Council[1] LinkedIn Connections Background "ECOSOC was established under the United Nations Charter as the principal organ to coordinate economic, social, and related work of the 14 UN specialized agencies, functional commissions and five regional commissions. The Council also receives reports from 11 UN funds and programmes. The Economic and Social Council (ECOSOC) serves as the central forum for discussing international economic and social issues, and for formulating policy recommendations addressed to Member States and the United Nations system. It is responsible for: promoting higher standards of living, full employment, and economic

322

I~ Central Nevada-40 UNITED STATES DEPARTMENT OF THE INTERIOR  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

i i I~ Central Nevada-40 UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Federal Center, Denver, Colorado 80225 USGS-474-90 SUMMARY OF HYDRAULIC TESTING IN AND CHEMICAL ANALYSES OF WATER SAMPLES FROM DEEP EXPLORATORY HOLES IN LITTLE FISH LAKE, MONITOR, HOT CREEK, AND LITTLE SMOKY VALLEYS, NEVADA By George A. Dinwiddie and leRoy J. Schroder ,.....---'-------.,... NOT ICE - - - - - - - - - - , .This report was prepared as an account of work . sponsored by. the. United States Government. Neither the United States nor the ·United States Atomic Energy Commission, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accurac y, com- pleteness or usefulness of any information, apparatus, product or process disclosed, or represents that its

323

Unit root properties of crude oil spot and futures prices  

Science Journals Connector (OSTI)

In this article, we examine whether WTI and Brent crude oil spot and futures prices (at 1, 3 and 6 months to maturity) contain a unit root with one and two structural breaks, employing weekly data over the period 1991–2004. To realise this objective we employ Lagrange multiplier (LM) unit root tests with one and two endogenous structural breaks proposed by Lee and Strazicich [2003. Minimum Lagrange multiplier unit root test with two structural breaks. Review of Economics and Statistics, 85, 1082–1089; 2004. Minimum LM unit root test with one structural break. Working Paper no. 04–17, Department of Economics, Appalachian State University]. We find that each of the oil price series can be characterised as a random walk process and that the endogenous structural breaks are significant and meaningful in terms of events that have impacted on world oil markets.

Svetlana Maslyuk; Russell Smyth

2008-01-01T23:59:59.000Z

324

Indexes of pumps for oil field pumping units  

SciTech Connect (OSTI)

As reported previously, a series of oil field pumping units has been developed with power outputs of 125, 250, 500, and 1000 kW, designed for injecting working fluids in cementing operations in oil and gas wells, hydraulic fracturing of formations, washing out sand plugs, and other production operations. The units are designed for the use of three-plunger pumps with individual power outputs of 125 or 500 kW. In the 250- and 1000-kW units, two such pumps are used. The 1000-kW pumping unit serves mainly for deep-penetration hydraulic fracturing of formations, and also for fracturing deep formations. The hydraulic fracturing process does not require the use of units with two pumps; this has been demonstrated by experience, both here and in other countries. All units intended for use in hydraulic fracturing are built with a single pump, transmission, and drive. Pumping units for well cementing must have two pumps that will give a high delivery rate. At the start of the operation, a single pump can be used to feed water into the cement mixer, with the second pump used to transfer the cement slurry to the well. Then both pumps are connected to the slurry injection line. The operation of these pumps is described.

Ibragimov, E.S.

1995-07-01T23:59:59.000Z

325

July 2012, Work Force Retention Work Group Status Overview  

Broader source: Energy.gov (indexed) [DOE]

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - anticipated completion no later than September, assuming timely OMB review and approval. 2. Draft PF Working Group charter final review by senior management to be

326

New Mexico grape growers unite  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

New Mexico grape growers unite, increase production New Mexico grape growers unite, increase production Grape Growers Association enlivens agriculture Growers association unites small parcels of land, enlivens production, protects water rights for Northern New Mexico agriculturists. August 6, 2012 Northern New Mexico Micro Grape Growers Association The NMSBA Entrepreneurial Networking program is helping Lucia Sanchez (C) Tim Martinez (R) and Robert Naranjo, the Northern New Mexico Micro Grape Growers Association, put small parcels of land back into production in Rio Arriba County. Contact Mariann Johnston (505) 667-4391 Email New Mexico grape growers unite to increase production, with help of Northern New Mexico Connect Over the last decade, a string of wineries has come to grace the scenic High Road to Taos. In 2010, Robert Naranjo, network facilitator for the

327

Reduction in Unit Steam Production  

E-Print Network [OSTI]

In 2001 the company's Arch-Brandenburg facility faced increased steam costs due to high natural gas prices and decreased production due to shutdown of a process. The facility was challenged to reduce unit steam consumption to minimize the effects...

Gombos, R.

2004-01-01T23:59:59.000Z

328

United States Department of Energy  

Energy Savers [EERE]

United States Department of Energy Office of Hearings and Appeals In the Matter of: Washington State ) Fleet Operations ) ) Filing Date: November 13, 2013 ) Case No.: EXA-13-0001...

329

Project Work | Tobias Berger | July 2006Page 1 Project Work  

E-Print Network [OSTI]

........................................................................................ 6 1.1.3 Working on the Brand Image ................................................................................................... 6 1.1 Brand Communication in International Collaboration at the Vattenfall Group

330

OpenEI - United States  

Open Energy Info (EERE)

United States United States Renewable Energy Technical Potential http://en.openei.org/datasets/node/912 License

331

Million U.S. Housing Units Total............................................................................  

U.S. Energy Information Administration (EIA) Indexed Site

Attached Attached 2 to 4 Units Table HC2.12 Home Electronics Usage Indicators by Type of Housing Unit, 2005 5 or More Units Mobile Homes Type of Housing Unit Housing Units (millions) Single-Family Units Apartments in Buildings With-- Home Electronics Usage Indicators Detached Energy Information Administration: 2005 Residential Energy Consumption Survey: Preliminary Housing Characteristics Tables Million U.S. Housing Units Attached 2 to 4 Units Table HC2.12 Home Electronics Usage Indicators by Type of Housing Unit, 2005 5 or More Units Mobile Homes Type of Housing Unit Housing Units (millions) Single-Family Units Apartments in Buildings With-- Home Electronics Usage Indicators Detached Status of PC When Not in Use Left On..............................................................

332

Lessons Learned in Optimizing Workers' and Worker Representatives' Input to Work Planning and Control  

Broader source: Energy.gov [DOE]

Slide Presentation by Tom McQuiston, Dr. P.H., United Steelworkers - Tony Mazzocchi Center for Health, Safety and Environmental Education. Lessons Learned in Optimizing Workers’ and Worker Representatives’ Input in Work Planning and Control.

333

33 CFR 322: Permits for Structures or Work in or Affecting Navigable...  

Open Energy Info (EERE)

to library Legal Document- RegulationRegulation: 33 CFR 322: Permits for Structures or Work in or Affecting Navigable Waters of the United StatesLegal Abstract These regulations...

334

FACT SHEET: BIOENERGY WORKING GROUP  

Broader source: Energy.gov (indexed) [DOE]

, 2010 , 2010 1 FACT SHEET: BIOENERGY WORKING GROUP At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers launched a Bioenergy Working Group, which will advance the deployment of bioenergy technologies by implementing recommendations of the Technology Action Plan on Bioenergy Technologies that was released by the Major Economies Forum Global Partnership in December 2009. The Working Group will work in close cooperation with the Global Bioenergy Partnership (GBEP), which is co-chaired by Brazil and Italy. Initial key activities of the Working Group include: 1. Global Bioenergy Atlas: The Working Group will combine and build upon existing databases of sustainably-developed bioenergy potential around the globe and make it available in an open web-

335

Work For Others (Non-Department of Energy Funded Work)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Work for Others (WFO) is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1A.

2001-09-28T23:59:59.000Z

336

Work For Others (Non-Department of Energy Funded Work)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Work for Others (WFO) is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. WFO has the following objectives. Cancels DOE O 481.1.

2001-01-03T23:59:59.000Z

337

September 2012, Work Force Retention Work Group Status Overview  

Broader source: Energy.gov (indexed) [DOE]

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 [Protective Force Personnel Medical, Physical Readiness, Training, and Access Authorization Standards] as a final rule that includes modification efforts to address barriers to workforce retention. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - publication anticipated this month.

338

Minimum-Energy Filtering on the Unit Circle Using Velocity Measurements with Bias and Vectorial state Measurements  

E-Print Network [OSTI]

Minimum-Energy Filtering on the Unit Circle Using Velocity Measurements with Bias and Vectorial consider minimum-energy filtering of a system defined on the unit circle when the angular velocity measure approximate minimum- energy filter for this system using vectorial measurements. This work extends prior work

Trumpf, Jochen

339

Infrared Thermography (IRT) Working Group  

Broader source: Energy.gov (indexed) [DOE]

Infrared Thermography (IRT) Working Group Sco McWilliams U.S. Photovoltaic Manufacturing Consor;um (PVMC) Infrared Thermography Infrared Thermography (IRT) has been demonstrated...

340

Working with SRNL - Technology Transfer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SRNL GO Tech Briefs Contacts Ombudsman Tech Home SRNL Home Working with SRNL Technology Transfer 2014 SRNL Research and Technology Recognition Reception Click to view the 2014...

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Strategic Initiatives Work Group Charter  

Broader source: Energy.gov [DOE]

Strategic Initiatives Work Group promote excellence and continuous improvement in the implementation of worker health and safety programs across the DOE complex.

342

High Temperature Membrane Working Group  

Broader source: Energy.gov [DOE]

The High Temperature Membrane Working Group consists of government, industry, and university researchers interested in developing high temperature membranes for fuel cells.

343

Renewable Electricity Working Group Presentation  

U.S. Energy Information Administration (EIA) Indexed Site

Renewable Electricity Working Group Chris Namovicz, Renewable Electricity Analysis Team July 9, 2013 Agenda * Review status of AEO 2013 * Discuss new model updates and development...

344

INL @ work: Nuclear Reactor Operator  

ScienceCinema (OSTI)

INL @ work features jobs at the Idaho National Laboratory. Learn more about careers and energy research at INL's facebook site http://www.facebook.com/idahonationallaboratory

Russell, Patty

2013-05-28T23:59:59.000Z

345

Interagency Sustainability Working Group | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Sustainable Buildings & Campuses Interagency Sustainability Working Group Interagency Sustainability Working Group The Interagency Sustainability Working Group (ISWG) is the...

346

Transuranic Waste Transportation Working Group Agenda | Department...  

Office of Environmental Management (EM)

Transuranic Waste Transportation Working Group Agenda Transuranic Waste Transportation Working Group Agenda Transuranic Waste Transportation Working Group Agenda More Documents &...

347

Million U.S. Housing Units Total...............................  

Gasoline and Diesel Fuel Update (EIA)

... 13.2 10.2 0.6 0.3 1.1 1.1 Table HC2.10 Home Appliances Usage Indicators by Type of Housing Unit, 2005 Housing Units (millions) Single-Family Units...

348

Offshore Aquaculture in the United States  

E-Print Network [OSTI]

Offshore Aquaculture in the United States: Economic Considerations, Implications & Opportunities). 2008. Offshore Aquaculture in the United States: Economic Considerations, Implications & Opportunities;Offshore Aquaculture in the United States: Economic Considerations, Implications & Opportunities Prepared

349

Saskatchewan Instructional Development and Research Unit (SIDRU)  

E-Print Network [OSTI]

Saskatchewan Instructional Development and Research Unit (SIDRU) 25th ANNUAL REPORT 2009 2010 Saskatchewan Instructional Development & Research Unit Faculty of Education: SIDRU@uregina.ca #12; CONTENTS SASKATCHEWAN INSTRUCTIONAL DEVELOPMENT & RESEARCH UNIT

Argerami, Martin

350

U.S. and India Hold the Second Meeting of the Indo-United States Civil  

Broader source: Energy.gov (indexed) [DOE]

India Hold the Second Meeting of the Indo-United States India Hold the Second Meeting of the Indo-United States Civil Nuclear Energy Working Group U.S. and India Hold the Second Meeting of the Indo-United States Civil Nuclear Energy Working Group April 30, 2009 - 12:00am Addthis The United States hosted the second meeting of the U.S.-India Civil Nuclear Energy Working Group at Idaho National Laboratory on April 28-30, 2009. This was the first meeting held by the Working Group since entry into force of the U.S.-India peaceful nuclear cooperation agreement. The agreement, signed in October 2008, aims to provide new opportunities for trade and job creation for both economies, help India meet its rapidly increasing energy needs in an environmentally responsible way, and enhance global nonproliferation efforts by bringing India closer to the nonproliferation

351

United States-Russia Joint Statement on the Results of the Nuclear...  

Broader source: Energy.gov (indexed) [DOE]

States-Russia Joint Statement on the Results of the Nuclear Energy and Nuclear Security Working Group Meeting United States-Russia Joint Statement on the Results of the Nuclear...

352

Webinar: Using the RTU Comparison Calculator to Justify High-Efficiency Units  

Broader source: Energy.gov [DOE]

The Advanced Rooftop Unit (RTU) Campaign is working with the Pacific Northwest National Laboratory (PNNL) to update its RTU Comparison Calculator (RTUCC). Join this webinar to learn how contractors...

353

Heavy Daily Precipitation Frequency over the Contiguous United States: Sources of Climatic Variability and Seasonal Predictability  

Science Journals Connector (OSTI)

By matching large-scale patterns in climate fields with patterns in observed station precipitation, this work explores seasonal predictability of precipitation in the contiguous United States for all seasons. Although it is shown that total ...

Alexander Gershunov; Daniel R. Cayan

2003-08-01T23:59:59.000Z

354

Development of a full-scale training simulator for an 800-MW power unit  

Science Journals Connector (OSTI)

Stages of work involving preparation of requirements specification, development, and subsequent implementation of a project for constructing a full-scale training simulator of an 800-MW power unit are consider...

S. K. Zhuravlev; A. M. Andreev

2013-07-01T23:59:59.000Z

355

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL  

Office of Legacy Management (LM)

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community Improvement Corporation 720 Mound Road Miamisburg, Ohio 45342-6714 Dear Mr. Bird: The Core Team, consisting of the U.S. Department of Energy Miamisburg Environmental Management Project (DOE-MEMP), U.S. Environmental Protection Agency (USEPA), and the Ohio Environmental Protection Agency (OEPA), appreciates your comments on the Work

356

Seismological Work in Japan1  

Science Journals Connector (OSTI)

... THE seismological work which has been accomplished in Japan is to a great extent described in fourteen small volumes published by a Society which ... study phenomena connected with earthquakes and volcanoes. This Society is called the Seismological Society of Japan. An epitome of a portion of this work is to be found in nine ...

1889-10-31T23:59:59.000Z

357

Making european-style community wind power development work in the United States  

E-Print Network [OSTI]

Wisconsin Community Based Windpower Project Business Plan.site, www.masstech.org/windpower/index.htm [12] __________.Wisconsin Community Based Windpower Project Business Plan”

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

358

Making european-style community wind power development work in the United States  

E-Print Network [OSTI]

5 3.1.1 Xcel Energy’s Wind7 3.1.3 Xcel Energy’s Small Wind Tariff and7 3.1.5 Xcel Energy’s Renewable Development

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

359

United States and UAE Work Together on Energy and Water Nexus...  

Office of Environmental Management (EM)

an important component of the U.S. energy mix, particularly as cities, universities, and health care complexes look to ensure energy reliability and increase efficiency. A recent...

360

OXY (Occidental Petroleum Corp. ) units plan U. K. work worth $1. 5 billion  

SciTech Connect (OSTI)

Occidental Refineries Ltd., an Occidental Petroleum Corp. subsidiary, plans to spend about $500,000 to build a 60,000 bbl/day hydrocracker on Canvey Island near London to produce aviation fuel, naphtha, and gasoline. Occidental hopes to deflect criticism by environmentalists, concerned about the concentration of petroleum facilities in the area, by installing a minimum amount of LPG storage and not using hydrogen sulfide on the site. During the 1970's, Occidental had prepared the site for the construction of a 125,000 bbl/day refinery, plans for which were scrapped after the demand for product compounds decreased. Occidental Chemical Co., another Occidental Petroleum subsidiary, plans to spend about $500,000 to build a 300,000 ton/yr ethylene plant at Peterhead, Scotl. The cracker would take part of the output from the de-ethanizer at the St. Fergus terminal for the proposed U.K. gas-gathering pipeline. Both projects would require about 3-4 yr to complete. Esso Chemical Ltd. will build a 550,000 ton/yr ethylene plant near the Mossmoran gas liquids plant in Fife, Scotl.

Not Available

1980-09-15T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Making european-style community wind power development work in the United States  

E-Print Network [OSTI]

and sells power to Xcel under the small wind tariff. Thecommunity wind projects are currently selling power to the

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

362

CANADA RUSSIA UNITED KINGDOM UNITED STATES Building / Launching / Operating first ever high definition,  

E-Print Network [OSTI]

1 CANADA · RUSSIA · UNITED KINGDOM · UNITED STATES 1 #12;2 Building / Launching / Operating first

363

Million U.S. Housing Units Total...............................  

Gasoline and Diesel Fuel Update (EIA)

Single-Family Units Apartments in Buildings With-- Table HC3.10 Home Appliances Usage Indicators by Owner-Occupied Housing Unit, 2005 Home Appliances Usage Indicators...

364

Million U.S. Housing Units Total...............................  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Single-Family Units Apartments in Buildings With-- Table HC4.10 Home Appliances Usage Indicators by Renter-Occupied Housing Unit, 2005 Home Appliances Usage Indicators...

365

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

0 Home Appliances Usage Indicators by Number of Household Members, 2005" " Million U.S. Housing Units" ,,"Number of Households With --" ,"Housing Units (millions)" ,,"1 Member","2...

366

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

0 Home Appliances Usage Indicators by Year of Construction, 2005" " Million U.S. Housing Units" ,,"Year of Construction" ,"Housing Units (millions)" ,,"Before 1940","1940 to...

367

Nuclear reactors in the United States  

Science Journals Connector (OSTI)

Nuclear reactors in the United States ... A chart listing the operating and planned nuclear reactors in the United States. ... Nuclear / Radiochemistry ...

Hubert N. Alyea

1956-01-01T23:59:59.000Z

368

United Solar Systems | Open Energy Information  

Open Energy Info (EERE)

United Solar Systems Place: Troy, MI References: United Solar Systems1 Information About Partnership with NREL Partnership with NREL Yes Partnership Type "CRADA" is not in the...

369

Unit Energy Europe AG | Open Energy Information  

Open Energy Info (EERE)

Hydro, Wind energy Product: Unit Energy develops and operates wind parks and hydroelectric power plants all across Europe. References: Unit Energy Europe AG1 This article...

370

Power and Energy Measurement Units and Techniques  

Science Journals Connector (OSTI)

The SI system (International System of Units) is a set of definitions and rules which provides an organic and consistent approach for obtaining the units for each quantity.

Giovanni Petrecca

1993-01-01T23:59:59.000Z

371

Power and Energy Measurement Units and Techniques  

Science Journals Connector (OSTI)

The SI system (International System of Units) is a set of definitions and rules which provides an organic and consistent approach for obtaining the units for each quantity.

Giovanni Petrecca

2014-01-01T23:59:59.000Z

372

Trends in Occupational Fatalities and Industry Growth for Construction Industry in the United States  

E-Print Network [OSTI]

sets. Some countries like Finland, Spain, and Switzerland exclude self-employed workers while Australia, Germany, Italy, and United States including all the workers when counting the deaths. In addition, countries have different coverage periods... for the work related deaths. For example; Australia, Finland, and Switzerland define the deaths if it occurs within one year. Germany and Spain count the work related deaths if it happens within a month, whereat united States, Italy, Norway have...

Dogan, Yildirim

2010-07-14T23:59:59.000Z

373

United Energy | Open Energy Information  

Open Energy Info (EERE)

United Energy United Energy Name United Energy Address 284, Old Deal Rd Place Eatontown, New Jersey Zip 07722 Sector Solar Product Energy Efficiency, Renewable Energy Year founded 2009 Number of employees 1-10 Phone number 201-697-8770 Website http://www.unitedenergypro.com Coordinates 40.2785975°, -74.0359722° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.2785975,"lon":-74.0359722,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

374

unit process | OpenEI  

Open Energy Info (EERE)

unit process unit process Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included. Source US Life Cycle Inventory Database Date Released May 01st, 2011 (3 years ago) Date Updated Unknown Keywords ASCC FRCC HICC interconnect region LCI life cycle inventory MRO NPCC RFC SERC SPP TRE unit process US utilities WECC Data application/zip icon interconnect_lci_datasets_2008.zip (zip, 6.3 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

375

United States Environmental Monitoring EPA  

Office of Legacy Management (LM)

United United States Environmental Monitoring EPA 600/R-93/141 Environmental Protection Systems Laboratory January 1992 Agency P.O. Box 93478 Las Vegas NV 89193-3478 Research and Development _EPA Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1991 Available to DOE and DOE contractors from the Office of Scientificand Technical Information, P.O. Box 62, Oak ridge,TN 39831; pricesavailablefrom (615) 576-8401 Availableto the publicfrom the NationalTechnicalInformationService, U.S. Departmentof Commerce, 5285 Port Royal Road, Springfield, VA 22161 Price Code: PrintedCopyof MicroficheA01 Frontand back cover: CommunityMonitorStation (front) and Whole BodyLaboratory(back), Craig A. Tsosle EnvironmentalMonitoringSystemsLaboratory-LasVegas, Nevada Offsite Environmental Monitoring Report:

376

file://\\Bellview\TeamWorks\TRUTeamWorks.htm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8/03 TRU TeamWorks will resume printing on January 8, 2004 | Shipments expected this we 8/03 TRU TeamWorks will resume printing on January 8, 2004 | Shipments expected this we December 18, 2003 The Big Story: It's a wrap - 2003 Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e- mail. WIPP Shipments (as of 12/18/03 at 8:14 a.m.) Shipments scheduled to arrive at WIPP this week 23 Total shipments received at WIPP 2,226 In 2003, the WIPP team delivered in every mission-essential area. TRU TeamWorks wraps up the calendar year with 2003's performance highlights. Steve Warren, Washington TRU Solutions (WTS) general manager, says, "I view

377

United States and Canada. The Tennessee Department  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

insect traps insect traps You may have noticed purple "boxes" hanging in area trees lately. These are three-sided insect traps for monitoring the spread of a non-native invasive insect that has killed several million ash trees in the eastern United States and Canada. The Tennessee Department of Agriculture has installed over 3500 of them in ash trees throughout the state. Working with the state we've placed several traps on the Oak Ridge Reservation to help determine the extent of the infestation. "The insect, called the emerald ash borer, hasn't been detected in Roane and Anderson Counties, which is home to the Department of Energy Reservation", reports Greg Byrd, forester with the ORNL Natural

378

Work for Others (Non-Department of Energy Funded Work)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Work for Others is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1B. Certified 1-13-11. Admin Chg 1, dated 3-14-11.

2005-01-24T23:59:59.000Z

379

Work for Others (Non-Department of Energy Funded Work)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Work for Others is the performance of work for non-Department of Energy (DOE) entities by DOE/National Nuclear Security Administration (NNSA) and/or their respective contractor personnel or the use of DOE/NNSA facilities that is not directly funded by DOE appropriations. Cancels DOE O 481.1B. Certified 1-13-11. Admin Chg 1, dated 3-14-11, cancels DOE O 481.1C.

2005-01-24T23:59:59.000Z

380

Units  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Unidades Unidades Principal ESTOY PERDIDO!!! En la Aventura de la Partículas, usamos a menudo distintas unidades, sin explicar formalmente qué significan. Aquí le damos una breve sinopsis de las unidades más comunes en la física de partículas: Energía: en electrón-volts (eV). La energía ganada por un electrón que remonta una diferencia de potencial de un volt. 1 eV = 1.6 x 10^(-19) joules. Un MeV es un millón de electrón volts, y un GeV es un billón de electrón volts. Un GeV es aproximadamente 1/1000 de la energía cinética de un mosquito! Masa: en GeV/c2 (un billón de electrón volts dividido por la velocidad de la luz al cuadrado. La masa es medida en términos de energía, debido a que la masa es justamente una forma de energía -- recuerde .) 1 GeV es

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Missouri Ordnance Works Becomes Bureau ot Mines Demonstration Plant  

Science Journals Connector (OSTI)

The Bureau of Mines estimates that the United States has about 3 trillion tons of coal reserves—enough to supply the nation with both solid and liquid fuels for at least 1,000 years. ... The Bureau of Mines will take over the Missouri Ordnance Works, near Louisiana, Mo., a $17,500,000 plant that made synthetic ammonia during the war, and convert it into a demonstration plant for the production of gasoline and oil from coal and lignite. ...

1946-01-10T23:59:59.000Z

382

RHIC II Science Working Groups  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Workshops Workshops The series of RHIC II Science Workshops began in November 2004, at which time seven Working Groups were initiated. These groups met in workshops through 2005, with the purpose of providing an organized forum for the community to address and describe quantitatively the most important science issues for the proposed RHIC II luminosity upgrade, and corresponding detector upgrades. Each Working Group was led by three convenors representing theory and experiment, and each has produced a detailed report (except for the "New Directions" group, which provided a sounding board and input to the other groups). The Working Group reports are linked below. The summary "white paper" document, "Future Science at the Relativistic Heavy Ion Collider" (PDF), is based on these reports, and was prepared by a Writing Committee that included at least one convenor from each of the Working Groups.

383

Working with Modules within Python  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Working with Modules within Perl and Python Working with Modules within Perl and Python Working with Modules within Perl and Python It can often be convenient to work with the modules system from within perl or python scripts. You can do this! Using Modules within Python The EnvironmentModules python package gives access to the module system from within python. The EnvironmentModules python package has a single function: module. Using this function you can provide the same arguments you would to "module" on the command line. The module() function accepts a list of arguments, like ['load','']; or ['unload','']. >>> import EnvironmentModules as EnvMod >>> EnvMod.module(['load','blast+']) It is important to understand that this is most effective for scripts

384

Utility Security & Resiliency: Working Together  

Broader source: Energy.gov [DOE]

Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—discusses Edison Electric Institute (EEI), including its key security objectives, key activities, cybersecurity activities, and spare transformer equipment program (STEP).

385

BEDES Strategic Working Group Recommendations  

Broader source: Energy.gov [DOE]

The BEDES Strategic Working Group Recommendations document is a guide to how the BEDES Dictionary can be brought to market and provide the services for which it was designed.

386

DOE Work Breakdown Structure Handbook  

Broader source: Energy.gov [DOE]

This handbook provides suggested guidance and best practices on the development of product-oriented Work Breakdown Structures (WBS) that should be used by all projects within DOE to organize and...

387

DOE Catalysis Working Group Meeting  

Broader source: Energy.gov (indexed) [DOE]

PEMFC Performance and Durability - Jim Waldecker (Ford) 9:45 - 10:00 Degradation of Nanoparticle Pt alloy and De-alloyed Pt Catalysts - Debbie Myers (ANL) Catalysis Working Group...

388

At Work in The World  

E-Print Network [OSTI]

the dis- cord created by dangerous health conditions was theDaum, Work Is Dangerous To Your Health, New York, Pantheon,health conditions of some ancient occupations. In particular, in the antiquity, one of the most dangerous and

Blanc, Paul D. MD; Dolan, Brian PhD

2012-01-01T23:59:59.000Z

389

Report of Working Group IV  

Science Journals Connector (OSTI)

This report summarizes the discussions of the Working Group on Resource Policy and East-West Relationships that were held as part of the NATO Advance Study Institute on “Deposit and Geoenvironmental Models for...

Gabor Gaál; Slavko Šolar

2002-01-01T23:59:59.000Z

390

Interagency Committees and Working Groups  

Broader source: Energy.gov [DOE]

DOE is actively involved with other Federal agencies that have responsibilities for the radiation protection of the public and the environment. This site provides the different committees and working groups that DOE is involved with.

391

United Nations on Trade and  

E-Print Network [OSTI]

by the World Summit on Sustainable Development in September 2002, the United Nations Forum on Forests on the Management, Conservation and Sustainable Development of All Types of Forests, and the relevant Chapters on the Management, Conservation and Sustainable Development of All Types of Forests; (e) Recognizing the importance

392

Impending United States Energy Crisis  

Science Journals Connector (OSTI)

...ERAB) of the U.S. Department of Energy and published in a report on future...this context are excerpted. The energy substructure of the United States...cogenerators of heat and electricity, wind-energy farmers, etc. It also includes...

ROBERT L. HIRSCH

1987-03-20T23:59:59.000Z

393

Work Plan - U.S.-India Coal Working Group | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Work Plan - U.S.-India Coal Working Group Work Plan - U.S.-India Coal Working Group Work Plan - U.S.-India Coal Working Group More Documents & Publications Work Group Telecom...

394

Assessment of Offshore Wind Energy Resources for the United States  

Wind Powering America (EERE)

Technical Report Technical Report NREL/TP-500-45889 June 2010 Assessment of Offshore Wind Energy Resources for the United States Marc Schwartz, Donna Heimiller, Steve Haymes, and Walt Musial National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-500-45889 June 2010 Assessment of Offshore Wind Energy Resources for the United States Marc Schwartz, Donna Heimiller, Steve Haymes, and Walt Musial Prepared under Task No. WE10.1211 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

395

1997 Housing Characteristics Tables Housing Unit Tables  

U.S. Energy Information Administration (EIA) Indexed Site

Million U.S. Households; 45 pages, 128 kb) Million U.S. Households; 45 pages, 128 kb) Contents Pages HC1-1a. Housing Unit Characteristics by Climate Zone, Million U.S. Households, 1997 4 HC1-2a. Housing Unit Characteristics by Year of Construction, Million U.S. Households, 1997 4 HC1-3a. Housing Unit Characteristics by Household Income, Million U.S. Households, 1997 4 HC1-4a. Housing Unit Characteristics by Type of Housing Unit, Million U.S. Households, 1997 3 HC1-5a. Housing Unit Characteristics by Type of Owner-Occupied Housing Unit, Million U.S. Households, 1997 3 HC1-6a. Housing Unit Characteristics by Type of Rented Housing Unit, Million U.S. Households, 1997 3 HC1-7a. Housing Unit Characteristics by Four Most Populated States, Million U.S. Households, 1997 4

396

Target Value Design: Applications to Newborn Intensive Care Units  

E-Print Network [OSTI]

teams are considering the transition from open-bay NICUs to single-family-room (SFR) units. This paper introduces the guiding principles behind target value design (TVD)—a price-led design methodology that is gaining acceptance in healthcare facility... pioneers. A working knowledge of the TVD framework is important for integrating long-term value into a NICU facility. Lean Construction and the Emergence of Target Value Design Success principles that originated from the Toyota Production System, later...

Rybkowski, Zofia K.; Shepley, Mardelle McCuskey; Ballard, H. Glenn

2015-02-08T23:59:59.000Z

397

Tax Credits and Welfare for Working Families: A Case Study of Policy Transfer  

Science Journals Connector (OSTI)

The United Kingdom has recently introduced the working families' tax credit (WFTC) as its main system of financial support for low-income working families. The reform has been motivated by the government's ‘common objectives of making work pay and tackling poverty’. In this chapter, we look at the history of in-work support in the United Kingdom, and the current structure and administration of the WFTC in particular. We pose a number of questions of relevance to future policy formation: to what extent has UK welfare policy been informed by international experience in general, and by the United States' experience of earned income tax credit and temporary assistance for needy families in particular? What are the mechanisms by which policy has been transferred between the US and the UK? And has the transfer led to ‘good’ policy?

Alan Duncan; David Greenaway

2004-01-01T23:59:59.000Z

398

Working Remotely | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Working Remotely Working Remotely Remote Access Use VPN to access Argonne resources Wake up your computer if power management policies have been applied Connect to your work computer by using Remote Desktop Communications Log into web-based e-mail Outlook Zimbra Send instant messages with Jabber Use Argonne's voice mail and teleconferencing services Use Adobe Connect for web conferencing E-Mail Client and Mobile Device Configuration Changes for Exchange 2010 Cyber Security Secure your home computers Passwords MyPassword Change your password Choosing a good password Other Tools Upload a file for retrieval by others (login required) Argonne SharePoint Server (login required) Inside Argonne (accessible onsite or through VPN) Focal Point Management Blog (accessible onsite or through VPN)

399

Energy Work | Open Energy Information  

Open Energy Info (EERE)

Work Work Jump to: navigation, search Name Energy Work Place Kelaniya, Sri Lanka Sector Biomass, Renewable Energy, Solar Product Dealing with renewable energy applications, specifically solar and biomass power generation Coordinates 6.95°, 79.916702° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":6.95,"lon":79.916702,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

400

CFN Ops Plan | Work Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Surveillance Guides - Work Control Process  

Broader source: Energy.gov (indexed) [DOE]

Work Control Process Work Control Process 1.0 Objective The objective of this surveillance guide is to provide lines of inquiry for evaluating the effectiveness of the contractor's work control process. Users should be cognizant that the lines of inquiry need to be further tailored to fit specific facilities or activities in accordance with contractual mechanisms such as Maintenance Implementation Plans, Conduct of Operations Implementation Plans, and the Integrated Safety Management System Description. 2.0 References 2.1 DOE 4330.4B Maintenance Management Program 2.2 48 CFR 1970.5204-2 Department of Energy Acquisition Regulations 2.3 DOE O 5480.19, Conduct of Operations 2.4 10 CFR 830.120, Quality Assurance 3.0 Requirements Implemented This surveillance is conducted to verify implementation of Core

402

Perma Works | Open Energy Information  

Open Energy Info (EERE)

Perma Works Perma Works Jump to: navigation, search Name Perma Works Place Albuquerque, New Mexico Zip 87123 Sector Geothermal energy Product A company that focuses on producing enhanced geothermal systems through providing electronics and software. Coordinates 35.08418°, -106.648639° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.08418,"lon":-106.648639,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

403

Work Practices for Chemical Fumehoods  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Practices for Chemical Fumehoods Practices for Chemical Fumehoods (Reviewed May 16, 2011) Always use a chemical fumehood when working with toxic and/or volatile chemicals, not on an open bench. Chemical fumehoods are designed to provide protection for the user from chemical and radiological contaminants. However, they do not absolutely eliminate exposure, even under ideal conditions. Careless work practices can result in considerable exposure to users who may believe they are protected. To optimize the performance of the chemical hood, adhere to the following work practices: 1. Ensure that your chemical hood has a current inspection sticker (dated within the last year). The face velocity should be between 80 and 120 linear feet per minute (lfpm). 2. Verify that the chemical hood is drawing air.

404

United Illuminating | Open Energy Information  

Open Energy Info (EERE)

Illuminating Illuminating Jump to: navigation, search Logo: United Illuminating Name United Illuminating Address 157 Church St Place New Haven, Connecticut Zip 06510 Sector Services Product Green Power Marketer Website http://www.uinet.com/ Coordinates 41.3073289°, -72.9247896° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.3073289,"lon":-72.9247896,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

405

Second United Nations International Conference  

Office of Scientific and Technical Information (OSTI)

Second United Nations Second United Nations International Conference on the Peaceful Uses of Atomic Energy ON THE ANALYSIS O F BUBBLE CHAMBER TRACKS Q Hugh Bradner and F r a n k Solmitz INTRODUCTION A j , L. - i Since i t s iyvention by Glaser in 1953, the bubble chamber has become a m o s t valuable tool $high-energy physics. It combines a number of advan- tages of various older methods of particle detection: resolution, rapid accumulation of data, some time resolution, and some choice of the nucleus whose interaction one wants to study (bubble chambers have been -'made to operate with a large number of different liquids, including Hz, D2, He, Xe, and s e v e r a l hydrocarbons). resolution and rapid data accumulation, high- speed high-precision analysis procedures m u s t be developed.

406

United Nations | Open Energy Information  

Open Energy Info (EERE)

Nations Nations Jump to: navigation, search Logo: United Nations Name United Nations Address UN Headquarters 1st Ave & 46th Street Place New York, NY Zip 10017 Region Northeast - NY NJ CT PA Area Year founded 1945 Website http://www.un.org/ Coordinates 40.7143528°, -74.0059731° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7143528,"lon":-74.0059731,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

407

United States | OpenEI  

Open Energy Info (EERE)

States States Dataset Summary Description No description given. Source National Renewable Energy Laboratory Date Released July 03rd, 2012 (2 years ago) Date Updated July 03rd, 2012 (2 years ago) Keywords biopower csp geothermal hydropower hydrothermal Renewable Energy Technical Potential rooftop United States utility-scale wind Data text/csv icon United States Renewable Energy Technical Potential (csv, 7.7 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL) Comment Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote

408

Policy Memo: Working Effectively with Contractors | Department...  

Energy Savers [EERE]

Policy Memo: Working Effectively with Contractors Policy Memo: Working Effectively with Contractors Guidance on working effectively with contractors. MAPolicyMemoWorkingwContracto...

409

U.S.-Vietnam Climate Change Working Group | Open Energy Information  

Open Energy Info (EERE)

Vietnam Climate Change Working Group Vietnam Climate Change Working Group Jump to: navigation, search Name U.S.-Vietnam Climate Change Working Group Agency/Company /Organization United States Geological Survey, Government of Vietnam Sector Energy, Land Topics Policies/deployment programs, Background analysis Website http://www.pwrc.usgs.gov/CCWG/ Program Start 2008 Country United States, Vietnam UN Region South-Eastern Asia, Northern America References U.S.-Vietnam Climate Change Working Group[1] "The U.S.-Vietnam Climate Change Working Group (CCWG) met in Hanoi from 31 March to 2 April 2010 and developed a program of cooperative work and projects. Priorities for cooperation included: I. To establish benchmark Surface Elevation Table (SET) devices on the Vietnam coast to measure coastal elevation change, the first step in

410

United States Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Ms. Marschman's experience, she was "slower than the other RCTs." Tr. at 239. Marcus Kelly, a coworker of Ms. Marschman's at CFA who also worked at MFC for 20 years, testified...

411

Categorical Exclusion for Maintenance Work  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

412

Public Works Transportation Infrastructure Study  

E-Print Network [OSTI]

and Alleys · Street Lights · Traffic Signals #12;Public Works Transportation Infrastructure Study Minneapolis Infrastructure Study Minneapolis City of Lakes Infrastructure Included in Analysis: · Bridges · Streets Infrastructure Study Minneapolis City of Lakes Existing Inventory & Current Conditions Street Pavement Before

Minnesota, University of

413

Working fluid for Rankine cycle  

SciTech Connect (OSTI)

A Rankine cycle working fluid is disclosed containing a mixture of 2,2,3,3tetrafluoropropanol and water, which is low toxic, incombustible, nonexplosive, noncorrosive and stable, and also has a high critical temperature and forms azeotropic-like composition. It is suited for use in a rankine cycle using heat source of low temperature.

Aomi, H.; Enjo, N.

1980-11-11T23:59:59.000Z

414

working with industry Engineering and  

E-Print Network [OSTI]

of interests including: · laser physics · semiconductor optoelectronics · photonics in manufacturing · solar · micromechanics and condition monitoring · renewable energy modelling · carbon capture and storage Our institute to applied systems. We have a wide ranging programme of current work with many industrial companies in key

Painter, Kevin

415

http://bellview/TeamWorks/TRUTeamWorks.htm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

A weekly e-newsletter for the Waste Isolation Pilot Plant team September 18, 2003 The Big Story Characterization Operations completed at ANL-E Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-18-03 at 7:17 a.m.) 21 Shipments scheduled to arrive at WIPP this week 2,020 Total shipments received at WIPP Months of dedication and teamwork have paid off for WIPP Central Characterization Project (CCP) employees working at Argonne National Laboratory - East (ANL-E). Characterization activities at the site have

416

http://bellview/TeamWorks/TRUTeamWorks.htm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

| NRC Officials Visit WIPP Tod | NRC Officials Visit WIPP Tod A weekly e-newsletter for the Waste Isolation Pilot Plant team September 25, 2003 The Big Story Recertification - a work in progress Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-25-03 at 7:16 a.m.) 21 Shipments scheduled to arrive at WIPP this week 2,044 Total shipments received at WIPP Without EPA approval, WIPP could not have received the first waste shipment in 1999. In 1998, EPA cleared the way for TRU waste disposal when it certified that the WIPP repository would safely contain

417

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

2 Appliances in U.S. Homes, by Owner/Renter Status, 2009" 2 Appliances in U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,"Total U.S.1 (millions)",,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" "Appliances",,"Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent" "Total Homes",113.6,76.5,37.1,63.2,8.6,3.9,2.8,1.5,7.6,2.3,16.8,5.5,1.4 "Cooking Appliances" "Stoves (Units With Both"

418

Historical Information on the Transportation External Coordination Working  

Broader source: Energy.gov (indexed) [DOE]

Historical Information on the Transportation External Coordination Historical Information on the Transportation External Coordination Working Group (TEC) Historical Information on the Transportation External Coordination Working Group (TEC) Historical Information on the Transportation External Coordination Working Group (TEC) TEC was formed in 1992 to improve coordination between the U.S. Department of Energy (DOE) and external groups interested in the Department's transportation activities. TEC was co-chaired by DOE's Office of Civilian Radioactive Waste Management and the Office of Environmental Management. Going the Distance "Going the Distance? The Safe Transport of Spent Nuclear Fuel and High-Level Radioactive Waste in the United States" available for free download from the National Academic Press Resources

419

Climate VISION: Private Sector Initiatives: Automobile Manufacturers: Work  

Office of Scientific and Technical Information (OSTI)

Work Plans Work Plans The Alliance of Automobile Manufacturers (Alliance) is a trade association of ten car and light truck manufacturers that account for more than 90 percent of U.S. vehicle sales. Member companies, which include BMW Group, DaimlerChrysler, Ford Motor Company, General Motors, Mazda, Mitsubishi Motors, Nissan, Porsche, Toyota, and Volkswagen, employ about 620,000 people in the United States in 35 states. Read the Alliance Work Plan (PDF 254 KB) Example 2-1: GM - Lighting efficiency plan to implement "green lights" projects at 73 plants (PDF 113 KB) Example 2-2: Ford - Plant-wide assessment to identify opportunities to reduce energy use (PDF 83 KB) Example 2-3: GM - Plant-wide audit to reduce energy use at Janesville truck plant (PDF 105 KB)

420

Port Angeles Public Works and Utilities - Commercial and Industrial Energy  

Broader source: Energy.gov (indexed) [DOE]

Port Angeles Public Works and Utilities - Commercial and Industrial Port Angeles Public Works and Utilities - Commercial and Industrial Energy Efficiency Rebate Program Port Angeles Public Works and Utilities - Commercial and Industrial Energy Efficiency Rebate Program < Back Eligibility Commercial Industrial Savings Category Home Weatherization Commercial Weatherization Appliances & Electronics Other Commercial Lighting Lighting Water Heating Maximum Rebate All Lighting: up to 70% of project cost All Custom: up to 70% of incremental energy project costs Program Info State District of Columbia Program Type Utility Rebate Program Rebate Amount Improvement to Existing Lighting System: $10 - $400/fixture Improvement to Existing Lighting Controls: $35 - $60/unit New Construction Lighting: $10 - $50 New Construction Energy Smart Design Office: $0.25 - $0.50 sq/ft

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Substances of Abuse and Work  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUBSTANCES OF ABUSE SUBSTANCES OF ABUSE AND WORK Mary L. Doyle, MPH, RN, COHN-5/CM DOE Headquarters January 16, 2002 Americans 12 Years and Older Using Dru s or Alcohol in the Past Month 1915 1995 1999 Substance Abuse in Industry * Drug use - associated with higher rates of )>absenteeism )>injury l> medical care utilization )> involuntary separation l> health care costs * Alcohol use in the workplace associated with l> absenteeism l> performance on specific tasks ::... mixed data on other outcomes Americans Over 12 Years Reporting Lifetime (Ever Used) Drug Use "'.11---------11--------l * Aloobol *Airf.Udruc 50.11---------11--------l * Mari- ODd ........ 40.11---------11----&.---l * Cocaiae *llalaciaogoal * Horoia Substance Abuse and Work

422

Working at ORNL | Careers | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

View Open Positions View Open Positions View Postdoctoral Positions Create A Profile Internal applicants please apply here View or update your current application or profile. External applicants Internal applicants Internet Explorer Browser preferred for ORNL applicants. Chrome is not currently supported. For more information about browser compatibility please refer to the FAQs. If you have difficulty using the online application system or need an accommodation to apply due to a disability, please email ORNLRecruiting@ornl.gov or phone 1-866-963-9545 Careers Home | ORNL | Careers | Working at ORNL SHARE Working at ORNL Community and Culture Here at Oak Ridge National Lab we have over 4,000 employees representing more than 80 different countries. Our employees make a difference in the

423

Will our nuclear weapons work?  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Will our nuclear weapons work? Will our nuclear weapons work? National Security Science magazine Latest Issue:April 2013 All Issues » submit Supercomputers are essential for assessing the health of the U.S. nuclear stockpile Supercomputers provide assurance by simulating nuclear weapons performance March 25, 2013 Graphic of a missile being tested through computer simulation Los Alamos uses supercomputers to make high-resolution 3D simulations that help to assess the health of nuclear weapons like this B-61 bomb. Contact Managing Editor Clay Dillingham Email The nuclear weapons in the U.S. stockpile were designed and built to be replaced with new designs and builds every 10 to 15 years. These weapons have lived beyond their expected lifespans. Supercomputers provide the high-resolution 3D simulations needed for

424

UNITED STATES DEPARTMENT OF ENERGY  

Broader source: Energy.gov (indexed) [DOE]

1 UNITED STATES DEPARTMENT OF ENERGY 2012 CONGESTION STUDY COMMENTS OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION I. Introduction. The Pennsylvania Public Utility Commission ("PAPUC" or "Commission") herein files its comments to the U.S. Department of Energy ("DOE") Federal Register Notice published on November 10, 2011 (76 FR 70122) soliciting comments in preparation for the 2012 DOE Congestion Study. The Energy Policy Act of 2005 ("EPAct of 2005") directed that DOE perform a triennial study, in consultation with states, of electric transmission congestion on the national grid. After receipt and consideration of

425

United States Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

United States Department of Energy Office of Hearings and Appeals In the Matter of: ) ) Philips Lighting Company; ) Case Nos.: EXC-12-0001 GE Lighting; and ) EXC-12-0002 OSRAM SYLVANIA, Inc. ) EXC-12-0003 ) Filing Date: February 22, 2012 ) ____________________________________) Issued: April 16, 2012 _____________________ Decision and Order ______________________ This Decision and Order considers Applications for Exception filed by Philips Lighting Company (Philips), GE Lighting (GE) and OSRAM SYLVANIA, Inc. (OSI) (collectively, "the Applicants"), seeking exception relief from the applicable provisions of 10 C.F.R. Part 430, pertaining to Energy Conservation Program: Energy Conservation Standards and Test

426

Compact monolithic capacitive discharge unit  

DOE Patents [OSTI]

A compact monolithic capacitive discharge unit (CDU) is disclosed in which a thyristor switch and a flyback charging circuit are both sandwiched about a ceramic energy storage capacitor. The result is a compact rugged assembly which provides a low-inductance current discharge path. The flyback charging circuit preferably includes a low-temperature co-fired ceramic transformer. The CDU can further include one or more ceramic substrates for enclosing the thyristor switch and for holding various passive components used in the flyback charging circuit. A load such as a detonator can also be attached directly to the CDU.

Roesler, Alexander W. (Tijeras, NM); Vernon, George E. (Rio Rancho, NM); Hoke, Darren A. (Albuquerque, NM); De Marquis, Virginia K. (Tijeras, NM); Harris, Steven M. (Albuquerque, NM)

2007-06-26T23:59:59.000Z

427

Visualization and Modeling Working Group  

SciTech Connect (OSTI)

During the 2005 Hurricane season, many consequence predictions were available from 36 to 96 hours before landfalls, via the Department of Energy’s Visualization and Modeling Working Group (VMWG). Real-time data can be tapped by local officials and utilities, and can also be accessed for post-event regulatory audits. An overview of VMWG’s models, results and uses will be presented.

Fernandez, S.J. (LANL); Dodrill, K.A.

2007-03-01T23:59:59.000Z

428

Definition: British thermal unit | Open Energy Information  

Open Energy Info (EERE)

thermal unit thermal unit Jump to: navigation, search Dictionary.png British thermal unit The amount of heat required to raise the temperature of one pound of water one degree Fahrenheit; often used as a unit of measure for the energy content of fuels.[1][2] View on Wikipedia Wikipedia Definition The British thermal unit (BTU or Btu) is a traditional unit of energy equal to about 1055 joules. It is the amount of energy needed to cool or heat one pound of water by one degree Fahrenheit. In scientific contexts the BTU has largely been replaced by the SI unit of energy, the joule. The unit is most often used as a measure of power (as BTU/h) in the power, steam generation, heating, and air conditioning industries, and also as a measure of agricultural energy production (BTU/kg). It is still used

429

UNIT NAME : KOW STANDPIPE REGULATORY STATUS: AOC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

093 UNIT NUMBER: 182 Pg 1 of 2 UNIT NAME : KOW STANDPIPE REGULATORY STATUS: AOC LOCATION: Outside plant security fence, southwest of C-611. 3 feet high by 3 feet in diameter....

430

The Sentara Mobile Mammography Unit | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Sentara Mobile Mammography Unit The Sentara Mobile Mammography Unit will be here at Jefferson Lab on December 11, 2014 from 9 a.m.-2 p.m. Mammography detects breast cancer and...

431

DSM BUYS RESINS UNIT OF AVECIA  

Science Journals Connector (OSTI)

DSM BUYS RESINS UNIT OF AVECIA ... DSM HAS AGREED TO ACQUIRE Avecia's NeoResins coating resins business for almost $680 million. ... The unit will be known as DSM NeoResins and will become part of DSM Coating Resins. ...

PATRICIA SHORT

2004-12-20T23:59:59.000Z

432

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

Appliances in U.S. Homes, by Housing Unit Type, 2009" Appliances in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,,,,,"5 or More Units","Mobile Homes" "Appliances",,"Detached","Attached","2 to 4 Units" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Cooking Appliances" "Stoves (Units With Both" "an Oven and a Cooktop)" "Use a Stove",102.3,62.3,6.4,8.7,18.3,6.5 "1.",100.8,61,6.4,8.6,18.3,6.5 "2 or More",1.5,1.3,0.1,"Q","Q","Q" "Do Not Use a Stove",11.3,9.5,0.3,0.3,0.8,0.4

433

UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE  

E-Print Network [OSTI]

UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE UNITED NATIONS 1992 FCCC/INFORMAL/84 GE.05-62220 (E) 200705 #12;UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE The Parties to this Convention in predictions of climate change, particularly with regard to the timing, magnitude and regional patterns thereof

Laughlin, Robert B.

434

A NEW MULTIPLE-UNIT ELECTRODIALYSIS APPARATUS  

Science Journals Connector (OSTI)

...NEW MULTIPLE-UNIT ELECTRODIALYSIS APPARATUS 10.1126...NEW MULTIPLE-UNIT ELECTRODIALYSIS APPARATUS. | Journal...maturity, variety and treatment on the iodine value...CHICAGO, ILLINOIS WATER SOLUBLE MAGNESIUM...NEW MULTIPLE-UNIT ELECTRODIALYSIS ous fields of science...

Aasulv Löddesöl

1932-07-22T23:59:59.000Z

435

" Million U.S. Housing Units,...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,7,5.2,3.2,1.8,0.9,0.3,0.8,4.5 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

436

International Standards and Units of Radioactivity  

Science Journals Connector (OSTI)

... latter could be measured and their radium contents expressed in grams. For the measurement of radon, grams (or cubic centimetres) of this gas are impracticable as units, and it ... gas are impracticable as units, and it was therefore decided to use as unit of radon the quantity which is in radioactive equilibrium with 1 gm. of radium; it was ...

1947-12-06T23:59:59.000Z

437

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

e'-ä\r., e'-ä\r., a"àT#j UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 6 14,15 ROSS AVENUE, SUITE 1200 DALLAS, TX 752A2-n33 JA¡t 5 20ll cERTrrmD rytAlr- RETIIRN RECETPT REOITESIEn COPY Edward Ziemianski Acting Manager U.S. Department of Energy Carlsbad Field Offïce P.O. Box 3090 Carlsbad, NM 88221 RE: United States Environmental Protection Agency (EPA) Region 6 Response to the Waste Isolation Pilot Plant OVPP) Approval Request to Use Panel 8 to Store and Land Dispose Polychlorinated Biphenyls (PCBs) at the WIPP Fasility located in Carlsbadr New Mexico DearMr. Ziemianski: After review ofthe design and proposed operation ofPanel 8, you are hereby approved to dispose of PCB wastes in Þanel 8 subject to the enclosed Conditions of Afproval. Your letter (dated October 25,2010) qéquested apprgrral to-qse

438

Transportation External Coordination Working Group:  

Broader source: Energy.gov (indexed) [DOE]

Accomplishments and Future Accomplishments and Future Transportation External Coordination Working Group Meeting Phoenix, AZ Judith A. Holm, Office of National Transportation Office of Civilian Radioactive Waste Management April 4, 2005 TEC MEMBER ORGANIZATIONS American College of Emergency Physicians (ACEP) American Nuclear Society (ANS) Association of American Railroads (AAR) Brotherhood of Locomotive Engineers and Trainmen (BLET) Commercial Vehicle Safety Alliance (CVSA) Conference of Radiation Control Program Directors, Inc. (CRCPD) Council of Energy Resource Tribes (CERT) Council of State Governments-Eastern Regional Conference (CSG-ERC) Council of State Governments-Midwestern Office (CSG-MW) Council on Radionuclides and Radiopharmaceuticals (CORAR) Dangerous Goods Advisory Council (DGAC)

439

Transportation External Coordination Working Group:  

Broader source: Energy.gov (indexed) [DOE]

Study of Study of DOE FY03 SNF Shipments Judith Holm National Transportation Program Albuquerque, New Mexico April 21, 2004 Background Benchmarking * The goal of benchmarking is to identify, understand, and adapt outstanding practices from organizations anywhere in the world to help your organization improve its performance * Benchmarking looks outward to find best practice and high performance and then measures actual business operations against those goals Background Best Practices * Best practices are proven solutions that represent superior performance when adapted and implemented in one's own organization. This includes processes and procedures that others are using to transport radioactive materials Background Lessons Learned * Lessons learned are "good work practices" or

440

Transportation External Coordination Working Group:  

Broader source: Energy.gov (indexed) [DOE]

External Coordination External Coordination Working Group: Background and Process Judith Holm National Transportation Program Albuquerque, New Mexico April 21, 2004 TEC History * DOE's Office of Environmental Management (EM) and Office of Civilian Radioactive Waste Management (OCRWM) formed TEC in 1992 * EM & RW developed MOU and TEC charter in 1992 - Other DOE program offices joined in 1993-94 * Other agencies (DOT, FRA, NRC, EPA) have been active participants Meeting Locations 1992-present Some Founding Principles * TEC concept centered on unique stakeholder accountability principles - Participation by key responsible parties in technical/policy issue discussion and resolution results in increased confidence and more efficient business decisions * Ultimate goal: develop multi-year set of

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

QuarkNet at Work  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

QuarkNet at Work Information for Active Mentors & Teachers     QuarkNet Home - Information - Calendar - Contacts - Projects - Forms: EoI - Teachers Information Active Centers Calendar Contacts Expectations: for Teachers, for Mentors Information on Other Funding Sources Program Overview Support: for Teachers, for Centers Staff Job Description Activities Essential Practices - Teaching with Inquiry (word.doc) Classroom Activities e-Labs: CMS - Cosmic Ray Boot Camp Project Activities Databases: Data Entry (password only) 2012 Center Reporting Resources Important Findings from Previous Years Mentor Tips Associate Teacher Institute Toolkit Print Bibliography - Online Resources Imaging Detector Principles of Professionalism for Science Educators - NSTA position

442

Beryllium Technology Research in the United States  

SciTech Connect (OSTI)

While most active research involving beryllium in the United States remains tied strongly to biological effects, there are several areas of technology development in the last two years that should be mentioned. (1) Beryllium disposed of in soil vaults at the Idaho National Laboratory (INL) Radioactive Waste Management Complex (RWMC) has been encapsulated in-situ by high-temperature and pressure injection of a proprietary wax based material to inhibit corrosion. (2) A research program to develop a process for removing heavy metals and cobalt from irradiated beryllium using solvent extraction techniques has been initiated to remove components that prevent the beryllium from being disposed of as ordinary radioactive waste. (3) The JUPITER-II program at the INL Safety and Tritium Applied Research (STAR) facility has addressed the REDOX reaction of beryllium in molten Flibe (a mixture of LiF and BeF2) to control tritium, particularly in the form of HF, bred in the Flibe by reactions involving both beryllium and lithium. (4) Work has been performed at Los Alamos National Laboratory to produce beryllium high heat flux components by plasma spray deposition on macro-roughened substrates. Finally, (5) corrosion studies on buried beryllium samples at the RWMC have shown that the physical form of some of the corroded beryllium is very filamentary and asbestos-like. This form of beryllium may exacerbate the contraction of chronic beryllium disease.

Glen R. Longhurst; Robert A. Anderl; M. Kay Adleer-Flitton; Gretchen E. Matthern; Troy J. Tranter; Kendall J. Hollis

2005-02-01T23:59:59.000Z

443

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

2 Household Demographics of U.S. Homes, by Owner/Renter Status, 2009" 2 Household Demographics of U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,"Total U.S.1 (millions)",,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" "Household Demographics",,"Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent" "Total Homes",113.6,76.5,37.1,63.2,8.6,3.9,2.8,1.5,7.6,2.3,16.8,5.5,1.4 "Number of Household Members"

444

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

2 Televisions in U.S. Homes, by Owner/Renter Status, 2009" 2 Televisions in U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,,,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" ,"Total U.S.1 (millions)" ,,"Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent" "Televisions" "Total Homes",113.6,76.5,37.1,63.2,8.6,3.9,2.8,1.5,7.6,2.3,16.8,5.5,1.4 "Televisions" "Number of Televisions"

445

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

2 Air Conditioning in U.S. Homes, by Owner/Renter Status, 2009" 2 Air Conditioning in U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,,,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" ,"Total U.S.1 (millions)" "Air Conditioning",,"Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent" "Total Homes",113.6,76.5,37.1,63.2,8.6,3.9,2.8,1.5,7.6,2.3,16.8,5.5,1.4 "Air Conditioning Equipment"

446

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

2 Space Heating in U.S. Homes, by Owner/Renter Status, 2009" 2 Space Heating in U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,,,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" ,"Total U.S.1 (millions)" ,,"Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent" "Space Heating" "Total Homes",113.6,76.5,37.1,63.2,8.6,3.9,2.8,1.5,7.6,2.3,16.8,5.5,1.4 "Space Heating Equipment"

447

http://bellview/TeamWorks/TRUTeamWorks.htm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

16/03 16/03 | Shipments expected this week: ANL-E (2) , RFETS (11), SRS (6) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 16, 2003 The Big Story EM-6 to review WIPP baseline Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 10/16/03 at 7:05 a.m.) Shipments scheduled to arrive at WIPP this week 19 Total shipments received at WIPP 2,095 A team from the DOE Office of Project Management, EM-6, will be on site next week to review the WIPP baseline and the integration of that baseline with the National TRU

448

http://bellview/TeamWorks/TRUTeamWorks.htm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3/03 3/03 | Shipments expected this week: RFETS (11), SRS (4), Hanford (2) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 23, 2003 Sealed sources: questions and answers Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 10/23/03 at 7:06 a.m.) Shipments scheduled to arrive at WIPP this week 17 Total shipments received at WIPP 2,115 Sealed sources have been a topic of discussion lately. Here are answers to some of the questions raised by this topic:

449

http://bellview/TeamWorks/TRUTeamWorks.htm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Thursday, 9/11/03 | Total shipments received at WIPP: 2003 | Shipments expected this Thursday, 9/11/03 | Total shipments received at WIPP: 2003 | Shipments expected this A weekly e-newsletter for the Waste Isolation Pilot Plant team September 11, 2003 The Big Story 2003 in 2003 Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-11-03 at 10 a.m.) 21 Shipments scheduled to arrive at WIPP this week 2,003 Total shipments received at WIPP The 2003 rd waste shipment arrived at the WIPP site today (Thursday, September 11) from Hanford. It is highly fitting that

450

http://bellview/TeamWorks/TRUTeamWorks.htm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9/04 9/04 Shipments expected this week: NTS (2), RFETS (13), SRS (6) January 29, 2004 The Big Story WTS restructures workforce Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 1/29/04 at 7:14 a.m.) Shipments scheduled to arrive at WIPP this week 21 Total shipments received at WIPP 2,309 Earlier this week WTS, the management and operating contractor at WIPP, announced a workforce restructuring plan to meet the current and future operational needs of the WIPP facility. It is anticipated

451

file://\\Bellview\TeamWorks\TRUTeamWorks.PDF  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Total shipments received at WIPP as of 8-25-03: 1,956 | Shipments expected this week: Hanford Total shipments received at WIPP as of 8-25-03: 1,956 | Shipments expected this week: Hanford A weekly e-newsletter for the Waste Isolation Pilot Plant team August 25, 2003 The Big Story INEEL drum fire and Senate Bill S. 1424: questions and answers Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e -mail. WIPP Shipments (as of 8-25-03) 19 Shipments scheduled to arrive at WIPP this week 1,956 Total shipments received at WIPP Some recent media coverage has created some confusion in the public about the

452

UNITED STATES GEOLOGICAL SURVEY DEPARTMENT OF THE INTERIOR  

Office of Scientific and Technical Information (OSTI)

UNITED STATES UNITED STATES GEOLOGICAL SURVEY DEPARTMENT OF THE INTERIOR i ..- - - - . WA-5 PROJECT REPORT West A f r i c a n S t a t e s (ECOWAS) Region I n v e s t i g a t i o n (1R)WA-5 USGS-OFR--82-714 DE84 900493 ASSESSMENT OF THE PETROLEUM, COAL,, AND GEOTHERMAL RESOURCES OF THE ECONOMIC COMMUNITY OF WEST AFRICAN STATES (ECOWAS) REGION Compiled by Robert E. M a t t i c k U.S. G e o l o g i c a l Survey Open-File Report 92 - 7/4! DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process

453

Electrochromic Glazings: How they Work  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How they Work How they Work Electrochromic glazings have great potential to improve the energy efficiency and occupant comfort afforded by architectural windows. These smart windows can dynamically control light transmission by windows in buildings, automobiles, and aircraft. Electrochromic glazings are the most significant members of a family of chromogenic light-control technologies that includes large-area dispersed liquid crystals, dispersed particle windows, and photochromic and thermochromic materials. Electrochromic devices represent the most versatile window technology of this type, exhibiting the best combination of switching properties for chromogenic window applications. Electrochromic glazings typically have a change in visible light transmission from 10% to 70%, moderately fast switching times, and low dc power consumption. These glazings have memory, so they only need power to make a change in transmission. Electrochromic technology can be coupled with smart control systems to give constant lighting levels, blending artificial lighting with daylighting for improved building energy efficiency. Energy simulations of office buildings indicate that smart windows with lighting controls in arid climates can provide 30-40% energy savings over conventional windows. Savings are realized in cooling, lighting, and peak utility electric loads. Other benefits include smaller heating, ventilating, and air-conditioning (HVAC) systems and greater thermal and visual comfort.

454

How the Artificial Retina Works  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Artificial Retina Works the Artificial Retina Works Artificial Retina Diagram Normal vision begins when light enters and moves through the eye to strike specialized photoreceptor (light-receiving) cells in the retina called rods and cones. These cells convert light signals to electric impulses that are sent to the optic nerve and the brain. Retinal diseases like age-related macular degeneration and retinitis pigmentosa destroy vision by annihilating these cells. With the artificial retina device, a miniature camera mounted in eyeglasses captures images and wirelessly sends the information to a microprocessor (worn on a belt) that converts the data to an electronic signal and transmits it to a receiver on the eye. The receiver sends the signals through a tiny, thin cable to the microelectrode array, stimulating it to emit pulses. The artificial retina device thus bypasses defunct photoreceptor cells and transmits electrical signals directly to the retina's remaining viable cells. The pulses travel to the optic nerve and, ultimately, to the brain, which perceives patterns of light and dark spots corresponding to the electrodes stimulated. Patients learn to interpret these visual patterns.

455

Mixed Waste Working Group report  

SciTech Connect (OSTI)

The treatment of mixed waste remains one of this country`s most vexing environmental problems. Mixed waste is the combination of radioactive waste and hazardous waste, as defined by the Resource Conservation and Recovery Act (RCRA). The Department of Energy (DOE), as the country`s largest mixed waste generator, responsible for 95 percent of the Nation`s mixed waste volume, is now required to address a strict set of milestones under the Federal Facility Compliance Act of 1992. DOE`s earlier failure to adequately address the storage and treatment issues associated with mixed waste has led to a significant backlog of temporarily stored waste, significant quantities of buried waste, limited permanent disposal options, and inadequate treatment solutions. Between May and November of 1993, the Mixed Waste Working Group brought together stakeholders from around the Nation. Scientists, citizens, entrepreneurs, and bureaucrats convened in a series of forums to chart a course for accelerated testing of innovative mixed waste technologies. For the first time, a wide range of stakeholders were asked to examine new technologies that, if given the chance to be tested and evaluated, offer the prospect for better, safer, cheaper, and faster solutions to the mixed waste problem. In a matter of months, the Working Group has managed to bridge a gap between science and perception, engineer and citizen, and has developed a shared program for testing new technologies.

Not Available

1993-11-09T23:59:59.000Z

456

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

Air Conditioning in U.S. Homes, by Housing Unit Type, 2009" Air Conditioning in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Air Conditioning" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Air Conditioning Equipment" "Use Air Conditioning Equipment",94,61.1,5.6,6.3,15.2,5.8 "Have Air Conditioning Equipment But" "Do Not Use It",4.9,2.6,0.2,0.7,0.9,0.4 "Do Not Have Air Conditioning Equipment",14.7,8.1,0.9,2.1,3,0.7 "Type of Air Conditioning Equipment "

457

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

Household Demographics of U.S. Homes, by Housing Unit Type, 2009" Household Demographics of U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Household Demographics" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Number of Household Members" "1 Person",31.3,14.4,2.1,3.4,9.6,1.9 "2 Persons",35.8,24.2,1.9,2.5,5,2.1 "3 Persons",18.1,12.1,1.2,1.3,2.2,1.2 "4 Persons",15.7,11.5,1,1,1.5,0.8 "5 Persons",7.7,5.8,0.3,0.5,0.6,0.5

458

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

Fuels Used and End Uses in U.S. Homes, by Housing Unit Type, 2009" Fuels Used and End Uses in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Fuels Used and End Uses" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Fuels Used for Any Use" "Electricity",113.6,71.8,6.7,9,19.1,6.9 "Natural Gas",69.2,45.6,4.7,6.1,11,1.8 "Propane/LPG",48.9,39.6,2.4,1.7,2,3.2 "Wood",13.1,11.4,0.3,0.2,0.5,0.7 "Fuel Oil",7.7,5.1,0.4,0.7,1.3,0.1

459

Next Generation Rooftop Unit | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Next Generation Rooftop Unit Next Generation Rooftop Unit Next Generation Rooftop Unit The U.S. Department of Energy is currently conducting research in a next generation rooftop unit (RTU). More than half of U.S. commercial building space is cooled by packaged heating, ventilation, and air conditioning (HVAC) equipment. Existing rooftop HVAC units consume more than 1.3% of the United States' annual energy usage annually. Project Description This project seeks to evaluate optimal design strategies for significantly improving the efficiency of rooftop units. The primary market for this project is commercial buildings, such as supermarkets and hotels. Project Partners Research is being undertaken through a cooperative research and development agreement (CRADA) between the Department of Energy and Oak Ridge National

460

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

Water Heating in U.S. Homes, by Housing Unit Type, 2009" Water Heating in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Water Heating" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Number of Storage Tank Water Heaters" 0,2.9,1.8,0.1,0.2,0.6,0.1 1,108.1,67.5,6.5,8.8,18.5,6.8 "2 or More",2.7,2.5,0.1,"Q","Q","Q" "Number of Tankless Water Heaters2" 0,110.4,69.5,6.5,8.9,18.6,6.8 1,3.1,2.2,0.2,0.2,0.5,"Q"

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

Space Heating in U.S. Homes, by Housing Unit Type, 2009" Space Heating in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Space Heating" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Space Heating Equipment" "Use Space Heating Equipment",110.1,70.5,6.5,8.7,17.7,6.7 "Have Space Heating Equipment But Do " "Not Use It",2.4,0.8,0.2,0.2,1,0.1 "Do Not Have Space Heating Equipment",1.2,0.6,"Q",0.1,0.4,"Q"

462

A Study of the Causes of the Service Fracture of Turbine Rotor Blade of Compressor Station Gas-Turbine Unit  

Science Journals Connector (OSTI)

On the basis of structural and fractographic the analysis of the fractured surface of working turbine blade of GTK-10-2 gas-turbine unit of compressor station it is established...

A. Ya. Krasovs’kyi; O. E. Gopkalo; I. O. Makovets’ka; O. O. Yanko

2013-07-01T23:59:59.000Z

463

The Technical and Economical Analysis on the Application of FGC in Large Scale Coal-fired Units  

Science Journals Connector (OSTI)

In this paper we describe that large scale coal-fired units are designed basing on the working condition of burning several coals because of the internal coal resources status in China at present. It differs a...

Liu Quanhui; Chen Xin; Chen Wenrui

2009-01-01T23:59:59.000Z

464

E-831 United States Government  

Office of Legacy Management (LM)

bOE 51325.8 bOE 51325.8 - E-831 United States Government memorandum pa? 1.- -g..bJ %i7Dm--~, I' )! f&,:& Department of Energy DATE: OCT 9 1984 REPLY T O NE-20 ATTN OF: Authorizations for Actions Under the Formerly Utilized Sites Remedial Action SUBJECT: Program (FUSRAP) at the St. Louis Airport Storage Site, St. Louis, M O . and the W . R. Grace Site at Curtis Bay, Md. To: J. LaGrone, Manager Oak Ridge Operations O ffice St. Louis Airport Storage Site, M O The House and Senate Reports for the Energy and W a ter Development Appropriation Act (P.L. 98-360) directed the Department of Energy "...to take the necessary steps to consolidate and dispose of the waste material from the Latty Avenue site and nearby St. Louis Airport vicinity properties locally, by reacquiring , stabilizing, and using the old 21.7

465

UNITED STATES GOVERNIMI~NT  

Office of Legacy Management (LM)

.;. ,! r ?- 1; ,: ( ,T .;. ,! r ?- 1; ,: ( ,T UNITED STATES GOVERNIMI~NT 7.;; ,:;$ _ a, -;::I-;. t, ,. :., .~, . ,.,,, : Thomas J. McCarvill, Chief, Physical Exploration Branch, Division of Baw : Reginald W. Bdmonds, Mining Engineer Division of Raw Naterials SUBJECT: MONAZITB DREDGING OPERATIONS AhD PLACER DEPOSITS CONTAINING TBOL~IIJM MINER&S SYXBOL: B&PM3 While at the Bureau of Mines office on June 2, 1955, Mr. Prank Lamb gave me the following information: The contract covering monazite production between Baumhoff-P~shall, Inc., and tke Lindsay Chemical Compaq expired early this year. Rro dredges ara still operating In the Cascade area, Valley County, Idaho, but expect to shut down about August 1 when monaaite require- ments under the Government contract will be completed. The two dredges

466

United States Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6 6 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CK-1-H Availability: This rate schedule shall be available to public bodies served through the facilities of Kentucky Utilities Company, (hereinafter called the Customers.) Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a nominal frequency of 60 hertz. The power shall be delivered at nominal voltages

467

United States General Accounting Office  

Broader source: Energy.gov (indexed) [DOE]

Washington, DC 20548 Washington, DC 20548 Comptroller General of the United States Decision Matter of: The Jones/Hill Joint Venture File: B-286194.4; B-286194.5; B-286194.6 Date: December 5, 2001 William A. Roberts III, Esq., Phillip H. Harrington, Esq., William S. Lieth, Esq., and Janet L. Eichers, Esq., Wiley, Rein & Fielding, for the protester. Marvin D. Norman, Esq., Vicki E. O'Keefe, Esq., and Robert E. Little, Jr., Esq., Department of the Navy, for the agency. Louis A. Chiarella, Esq., John L. Formica, Esq., and James A. Spangenberg, Esq., Office of the General Counsel, GAO, participated in the preparation of the decision. DIGEST 1. A conflict of interest existed in an Office of Management and Budget Circular A-76 commercial activities study where a Navy employee and a private-sector consultant

468

United Nations | OpenEI  

Open Energy Info (EERE)

Nations Nations Dataset Summary Description (Abstract): Project overview describing rationale, products and partners of the UNEP/GEF Solar and Wind Energy Resource Assessment project. (Purpose): Project overview for presentation at the Asia regional meeting at the Second International Conference on Renewable Energy Technology for Rural Development (RETRUD-03) in Katmandu on 12-14 October 2003 Source NREL Date Released October 14th, 2003 (11 years ago) Date Updated October 20th, 2007 (7 years ago) Keywords GEF solar SWERA UNEP United Nations wind Data application/zip icon Download Presentation (zip, 5 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period 1997 License License Other or unspecified, see optional comment below

469

United States Nuclear Regulatory Commission  

Broader source: Energy.gov (indexed) [DOE]

qU oSoLTJRC qU oSoLTJRC United States Nuclear Regulatory Commission Protecting People and the Environment NUREG-1872, Vol. 2 HudcD [jE©wftamfsýýpc Wafm(M oran EA Office of New Reactors AVAILABILITY OF REFERENCE MATERIALS IN NRC PUBLICATIONS NRC Reference Material As of November 1999, you may electronically access NUREG-series publications and other NRC records at NRC's Public Electronic Reading Room at http:t/www.nrc..ov/reading-rm.html. Publicly released records include, to name a few, NUREG-series publications; Federal Register notices; applicant, licensee, and vendor documents and correspondence; NRC correspondence and internal memoranda; bulletins and information notices; inspection and investigative reports; licensee event reports; and Commission papers and their attachments.

470

UNITED STATES DEPARTMENT OF ENERGY  

Broader source: Energy.gov (indexed) [DOE]

DAVID N. "DAVE" LOPEZ DAVID N. "DAVE" LOPEZ Title: Senior Aviation Policy Officer Organization: Office of Aviation Management/MA-30 Address: Headquarters, United States Department of Energy 1000 Independence Avenue S.W. Washington, D.C. 20585 E-mail Address: David.Lopez@hq.doe.gov Phone Number: Office: (202) 586-6177, Mobile: (240) 449-0895 Fax Number: (202) 586-6008 Biographical Summary: Dave Lopez is a highly skilled manager and leader with over 34 years experience in government aviation operations and staff management /oversight programs. As an Air Force pilot, he served in a wide variety of aviation operations and management positions, and he retired in 1999 in the grade of Colonel as the Director, Commander-in-Chief's Staff Group, U.S. Strategic Command, Offutt AFB, NE. He joined DOE in 2000 as

471

Work continues on SIF | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of the six instrument bays are lined with aluminum to eliminate potential electromagnetic interference. The service corridor will also house separate HVAC units to closely...

472

Wind Working Group Toolkit | Open Energy Information  

Open Energy Info (EERE)

abundant wind resources for electric power generation will help the United States reduce air pollution and greenhouse gas emissions, diversify the country's energy supply, provide...

473

Energy Input per Unit Length – High Accuracy Kinematic Metrology in Laser Material Processing  

Science Journals Connector (OSTI)

Laser material processes require constant energy input per unit length. Besides focal z-position, spot size, laser power and other process parameters, the relative travel speed (feed rate) of the laser spot on the work piece has the highest influence on the resulting energy input per unit length. In this paper a new metrology method is introduced, which enables users in industry and research to measure the real travel speed of the laser spot and the resulting contour of the trajectory.

Christoph Franz; Peter Abels; Raphael Rolser; Michael Becker

2011-01-01T23:59:59.000Z

474

SOLVING THE SHUGART QUEEN SAND PENASCO UNIT DECLINING PRODUCTION PROBLEM  

SciTech Connect (OSTI)

The Penasco Shugart Queen Sand Unit located in sections 8, 9, 16 & 17, T18S, 31E Eddy County New Mexico is operated by MNA Enterprises Ltd. Co. Hobbs, NM. The first well in the Unit was drilled in 1939 and since that time the Unit produced 535,000 bbl of oil on primary recovery and 375,000 bbl of oil during secondary recovery operations that commenced in 1973. The Unit secondary to primary ratio is 0.7, but other Queen waterfloods in the area had considerably larger S/P ratios. On June 25 1999 MNA was awarded a grant under the Department of Energy's ''Technology Development with Independents'' program. The grant was used to fund a reservoir study to determine if additional waterflood reserves could be developed. A total of 14 well bores that penetrate the Queen at 3150 ft are within the Unit boundaries. Eleven of these wells produced oil during the past 60 years. Production records were pieced together from various sources including the very early state production records. One very early well had a resistivity log, but nine of the wells had no logs, and four wells had gamma ray-neutron count-rate perforating logs. Fortunately, recent offset deep drilling in the area provided a source of modern logs through the Queen. The logs from these wells were used to analyze the four old gamma ray-neutron logs within the Unit. Additionally the offset well log database was sufficient to construct maps through the unit based on geostatistical interpolation methods. The maps were used to define the input parameters required to simulate the primary and secondary producing history. The history-matched simulator was then used to evaluate four production scenarios. The best scenario produces 51,000 bbl of additional oil over a 10-year period. If the injection rate is held to 300 BWPD the oil rate declines to a constant 15 BOPD after the first year. The projections are reasonable when viewed in the context of the historical performance ({approx}30 BOPD with a {approx}600 BWPD injection rate during 1980-1990). If an additional source of water is developed, increasing the injection rate to 600 BWPD will double the oil-producing rate. During the log evaluation work the presence of a possibly productive Penrose reservoir about 200 ft below the Queen was investigated. The Penrose zone exists throughout the Unit, but appears to be less permeable than the Queen. The maps suggest that either well 16D or 16C are suitable candidates for testing the Penrose zone.

Lowell Deckert

2000-08-25T23:59:59.000Z

475

WORKING PARK-FUEL CELL COMBINED HEAT AND POWER SYSTEM  

SciTech Connect (OSTI)

This report covers the aims and objectives of the project which was to design, install and operate a fuel cell combined heat and power (CHP) system in Woking Park, the first fuel cell CHP system in the United Kingdom. The report also covers the benefits that were expected to accrue from the work in an understanding of the full technology procurement process (including planning, design, installation, operation and maintenance), the economic and environmental performance in comparison with both conventional UK fuel supply and conventional CHP and the commercial viability of fuel cell CHP energy supply in the new deregulated energy markets.

Allan Jones

2003-09-01T23:59:59.000Z

476

United Way Campaign Kick-Off | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

United Way Campaign Kick-Off United Way Campaign Kick-Off United Way Campaign Kick-Off Posted: September 30, 2013 - 6:36pm Y-12's 2013 United Way Campaign officially kicked off at the end of August with an event featuring Holly Warlick, head basketball coach of the University of Tennessee Lady Vols. She encouraged Y-12 employees to increase their giving and challenged the site to do more for the community. "I hear you all are in the top five of giving to United Way - don't you want to be number one?" she asked. "Y'all need to be on top. Y'all need to be number one." Speaking of number one, Warlick talked about her new team, which will try to repeat as Southeastern Conference champions, and the work they do beyond basketball. "We try to get our young ladies to give back," Warlick

477

The United States Plutonium Balance, 1944-2009 | National Nuclear Security  

National Nuclear Security Administration (NNSA)

United States Plutonium Balance, 1944-2009 | National Nuclear Security United States Plutonium Balance, 1944-2009 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The United States Plutonium Balance, 1944-2009 Home > Our Mission > Managing the Stockpile > Plutonium Pits > The United States Plutonium Balance, 1944-2009 The United States Plutonium Balance, 1944-2009

478

Toolbox Safety Talk Articulating Boom Work Platforms  

E-Print Network [OSTI]

Toolbox Safety Talk Articulating Boom Work Platforms Environmental Health & Safety Facilities sign-in sheet to Environmental Health & Safety for recordkeeping. Articulating boom work platforms Articulating Boom Work Platforms Environmental Health & Safety Facilities Safety & Health Section 395 Pine Tree

Pawlowski, Wojtek

479

How Fuel Cells Work | Department of Energy  

Energy Savers [EERE]

Fuel Cells Work How Energy Works 30 likes How Fuel Cells Work Fuel cells produce electrical power without any combustion and operate on fuels like hydrogen, natural gas and...

480

Covariance evaluation work at LANL  

SciTech Connect (OSTI)

Los Alamos evaluates covariances for nuclear data library, mainly for actinides above the resonance regions and light elements in the enUre energy range. We also develop techniques to evaluate the covariance data, like Bayesian and least-squares fitting methods, which are important to explore the uncertainty information on different types of physical quantities such as elastic scattering angular distribution, or prompt neutron fission spectra. This paper summarizes our current activities of the covariance evaluation work at LANL, including the actinide and light element data mainly for the criticality safety study and transmutation technology. The Bayesian method based on the Kalman filter technique, which combines uncertainties in the theoretical model and experimental data, is discussed.

Kawano, Toshihiko [Los Alamos National Laboratory; Talou, Patrick [Los Alamos National Laboratory; Young, Phillip [Los Alamos National Laboratory; Hale, Gerald [Los Alamos National Laboratory; Chadwick, M B [Los Alamos National Laboratory; Little, R C [Los Alamos National Laboratory

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Isotope Work at Oak Ridge  

Science Journals Connector (OSTI)

The special training division of the Oak Ridge Institute of Nuclear Studies has announced that three additional courses in the techniques of using radioisotopes in research have been scheduled during the winter and spring of 1951. They are to be held from January 8th to February 2nd from February 19th to March 16th and from April 16th to May 11th. Designed to acquaint research workers with the safe and efficient use of radioisotopes the courses include laboratory work lectures and special?topic seminars. Experiments cover such matters as the use and calibration of instruments purification and separation of radioactive materials from inert and other radioactive materials and pile activation technology. The seminars cover various biological and medical uses of radioisotopes and the design of radiochemical laboratories.

C. P. Keim; H. W. Savage; Boyd Weaver

1951-01-01T23:59:59.000Z

482

United Nations Environment Programme Feed | Open Energy Information  

Open Energy Info (EERE)

United Nations Environment Programme Feed United Nations Environment Programme Feed Jump to: navigation, search Home | About | Inventory | Partnerships | Capacity Building | Webinars | Reports | Events | News | List Serve CLEAN Member Feeds Center for Environment and National Security at Scripps Centro de EnergĂ­as Renovables (CER) The Children's Investment Fund Foundation (CIFF) Climate and Development Knowledge Network (CDKN) Climate Technology Initiative (CTI) ClimateWorks Foundation Coalition for Rainforest Nations (CfRN) Ecofys Energy Research Centre of the Netherlands (ECN) Energy Sector Management Assistance Program of the World Bank (ESMAP) Environment and Development Action in the Third World (ENDA-TM) German Aerospace Center (DLR) German Agency for International Cooperation (GIZ) Global Village Energy Partnership (GVEP)

483

Monticello Mill Tailings Site Operable Unit Ill Interim Remedial Action  

Office of Legacy Management (LM)

Site Site Operable Unit Ill Interim Remedial Action Mark Perfxmed Under DOE Contrici No. DE-AC13-96CJ873.35 for th3 U.S. De[:ar!menf of Energy app~oveJioi'ptiL#ic re1ease;dCinWlionis Unlimilra' This page intentionally left blank Monticello Mill Tailings Site Operable Unit I11 Interim Remedial Action Annual Status Report August 1999 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number MSG-035-0011-00-000 Document Number Q0017700 Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC99-03 This page intentionally blank Document Number Q0017700 Acronyms Contents Page ACRONYMS .............................................................................................................................. V

484

REQUEST BY UNITED TECHNOLOGIES, PRATT & WHITNEY, FOR AN ADVANCE WAIVER OF DOMESTIC  

Broader source: Energy.gov (indexed) [DOE]

UNITED TECHNOLOGIES, PRATT & UNITED TECHNOLOGIES, PRATT & WHITNEY, FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN RIGHTS IN SUBJECT INVENTIONS MADE IN THE COURSE OF OR UNDER DEPARTMENT OF ENERGY CONTRACT NO. DE-AC05-950R22426; DOE WAIVER DOCKET W(A)-95-037 [ORO-608] United Technologies, Pratt & Whitney (Pratt & Whitney) has made a timely request for an advance waiver to worldwide rights in Subject Inventions made in the course of or under Department of Energy (DOE) Contract No. DE-AC05- 950R22426. This work is being done under the Department of Energy's (DOE) Advanced Turbine System (ATS) program and the work calls for the development of thermal barrier coatings (TBC) technology for use in land based gas turbines. The work is sponsored by the Office of Industrial Technologies.

485

http://bellview/TeamWorks/TRUTeamWorks.htm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9/03 | Shipments expected this week: Hanford (1), RFETS (11), SRS (6) | 9/03 | Shipments expected this week: Hanford (1), RFETS (11), SRS (6) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 9, 2003 The Big Story It's a whole new "WIPP Experience" Topics Characterization News Transportation News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e- mail. WIPP Shipments (as of 10/9/03 at 7:24 a.m.) Shipments scheduled to arrive at WIPP this week 18 Total shipments received at WIPP 2,081 If you haven't been to the SWB lately, you are in for a big surprise. The lobby sports a new look these days, complete with banners and updated exhibits. And the new look isn't just

486

file://\\Bellview\TeamWorks\TRUTeamWorks.htm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

30/03 Shipments expected this week: RFETS (11), SRS (4), Hanford (2) 30/03 Shipments expected this week: RFETS (11), SRS (4), Hanford (2) A weekly e-newsletter for the Waste Isolation Pilot Plant team October 30, 2003 ARROW-PAK Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e- mail. WIPP Shipments (as of 10/30/03 at 6:59 a.m.) Shipments scheduled to arrive at WIPP this week 17 Total shipments received at WIPP 2,129 You've heard of the TRUPACT-II, the pipe overpack, the RH-72B and even the 10- 160B. But have you heard about the ARROW-PAK? ARROW-PAK is a transportation container designed to contain and transport high-wattage TRU waste.

487

1997 Housing Characteristics Tables Housing Unit Tables  

U.S. Energy Information Administration (EIA) Indexed Site

Percent of U.S. Households; 45 pages, 121 kb) Percent of U.S. Households; 45 pages, 121 kb) Contents Pages HC1-1b. Housing Unit Characteristics by Climate Zone, Percent of U.S. Households, 1997 4 HC1-2b. Housing Unit Characteristics by Year of Construction, Percent of U.S. Households, 1997 4 HC1-3b. Housing Unit Characteristics by Household Income, Percent of U.S. Households, 1997 4 HC1-4b. Housing Unit Characteristics by Type of Housing Unit, Percent of U.S. Households, 1997 3 HC1-5b. Housing Unit Characteristics by Type of Owner-Occupied Housing Unit, Percent of U.S. Households, 1997 3 HC1-6b. Housing Unit Characteristics by Type of Rented Housing Unit, Percent of U.S. Households, 1997 3 HC1-7b. Housing Unit Characteristics by Four Most Populated States, Percent of U.S. Households, 1997 4

488

United States -Japan Joint Nuclear Energy Action Plan | Department...  

Energy Savers [EERE]

United States -Japan Joint Nuclear Energy Action Plan United States -Japan Joint Nuclear Energy Action Plan President Bush of the United States and Prime Minister Koizumi of Japan...

489

Fuel Cell Technologies Office: Catalysis Working Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Catalysis Working Catalysis Working Group to someone by E-mail Share Fuel Cell Technologies Office: Catalysis Working Group on Facebook Tweet about Fuel Cell Technologies Office: Catalysis Working Group on Twitter Bookmark Fuel Cell Technologies Office: Catalysis Working Group on Google Bookmark Fuel Cell Technologies Office: Catalysis Working Group on Delicious Rank Fuel Cell Technologies Office: Catalysis Working Group on Digg Find More places to share Fuel Cell Technologies Office: Catalysis Working Group on AddThis.com... Key Activities Plans, Implementation, & Results Accomplishments Organization Chart & Contacts Quick Links Hydrogen Production Hydrogen Delivery Hydrogen Storage Fuel Cells Technology Validation Manufacturing Codes & Standards Education Systems Analysis

490

How Distributed Wind Works | Department of Energy  

Energy Savers [EERE]

Basics How Distributed Wind Works How Distributed Wind Works Residential Small wind turbines can be used in residential settings to directly offset electricity usage using net...

491

Transportation Protocols Working Group First Conference Call...  

Broader source: Energy.gov (indexed) [DOE]

Call March 1, 1999 Conference Call Summary The first conference call of the Transportation External Coordination Working Group (TECWG) DOE Transportation Protocols Working...

492

Working at EERE | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Employment Opportunities Working at EERE Working at EERE As a model employer and diversityinclusion leader, we treat people as our greatest asset at the Office of Energy...

493

Three small businesses selected for environmental work  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

work Three small businesses selected for environmental work ARS Cavanagh Environmental Services, LLC; Portage, Inc.; and Navarro Research & Engineering, Inc. awarded a master...

494

Earth Day event showcases LANL energy work  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Earth Day showcases energy work Earth Day event showcases LANL energy work The public is invited to learn about projects in energy conservation, generation, research, and...

495

Training Work Group Charter | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Charter Training Work Group Charter The Training Work Group fosters improvements in the quality, efficacy, and delivery of DOE safety training, and realizes significant...

496

California Working Natural Gas Underground Storage Capacity ...  

Gasoline and Diesel Fuel Update (EIA)

Working Natural Gas Underground Storage Capacity (Million Cubic Feet) California Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Year Jan Feb Mar Apr May Jun...

497

California Working Natural Gas Underground Storage Capacity ...  

U.S. Energy Information Administration (EIA) Indexed Site

Working Natural Gas Underground Storage Capacity (Million Cubic Feet) California Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Decade Year-0 Year-1 Year-2...

498

Working with CFTF | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CFTF Working with CFTF CFTF | Carbon Fiber Technology Facility Home | User Facilities | CFTF | Working with CFTF SHARE Low-Cost Carbon Fiber Available to US Manufacturers for...

499

Federal Utility Partnership Working Group Utility Partners  

Broader source: Energy.gov [DOE]

Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

500

Chemically Reactive Working Fluids | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Chemically Reactive Working Fluids for the Capture and Transport of Concentrated Solar Thermal Energy for Power Generation Chemically Reactive Working Fluids SunShot CSP...