Powered by Deep Web Technologies
Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Statement: Committee on Environment and Public Works United States...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement: Committee on Environment and Public Works United States Senate Statement: Committee on Environment and Public Works United States Senate Senate Testimony Committee on...

2

Glossary - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

Uranium fuel, nuclear reactors, generation, spent fuel. Total Energy. ... Separative work unit (SWU): The standard measure of enrichment services.

3

United States-Japan Nuclear Security Working Group Fact Sheet...  

NLE Websites -- All DOE Office Websites (Extended Search)

United States-Japan Nuclear Security Working Group Fact Sheet | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the...

4

WIPP Facility Work Plan for Solid Waste Management Units  

Science Conference Proceedings (OSTI)

This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A Phase I RFI was completed at WIPP as part of a Voluntary Release Assessment (VRA). The risk-based decision criteria recommended by EPA for the VRA were contained in a proposed Corrective Action rule for SWMUs (EPA, 1990). EPA Region VI has issued new risk-based screening criteria applicable to the WIPP SWMUs and AOCs.

Washington TRU Solutions LLC

2000-02-25T23:59:59.000Z

5

WIPP Facility Work Plan for Solid Waste Management Units  

Science Conference Proceedings (OSTI)

This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

Washington TRU Solutions LLC

2001-02-25T23:59:59.000Z

6

WIPP Facility Work Plan for Solid Waste Management Units  

Science Conference Proceedings (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-02-14T23:59:59.000Z

7

United States-Japan Nuclear Security Working Group Fact Sheet | National  

National Nuclear Security Administration (NNSA)

United States-Japan Nuclear Security Working Group Fact Sheet | National United States-Japan Nuclear Security Working Group Fact Sheet | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Fact Sheets > United States-Japan Nuclear Security Working Group Fact Sheet Fact Sheet United States-Japan Nuclear Security Working Group Fact Sheet Mar 27, 2012

8

Geology And A Working Conceptual Model Of The Obsidian Butte (Unit 6)  

Open Energy Info (EERE)

Geology And A Working Conceptual Model Of The Obsidian Butte (Unit 6) Geology And A Working Conceptual Model Of The Obsidian Butte (Unit 6) Sector Of The Salton Sea Geothermal Field, California Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Geology And A Working Conceptual Model Of The Obsidian Butte (Unit 6) Sector Of The Salton Sea Geothermal Field, California Details Activities (2) Areas (1) Regions (0) Abstract: A working conceptual model has been developed for the southwestern portion of the Salton Sea geothermal system, the region encompasing CalEnergy Operating Company's imnent 'Unit 6' field expansion (185 megawatts). The model is based on examination and analysis of several thousand borehole rock samples combined with a wealth of subsurface information made available for the first time from the databases of present

9

Description of work for 100-DR-2 Operable Unit Vadose Drilling/test pits  

SciTech Connect

This report describes the scope of work for the boreholes/test pits of the 100-DR-2 Operable Unit. Sampling and field activities include: Soil screening; geologic sampling; soil sampling (physical property); analytical sampling and depths; and geophysical logging.

Naiknimbalkar, N.

1993-08-01T23:59:59.000Z

10

Working Performance of Focused Ultrasonic Search Units Utilizing a Modified 725 Immerscope  

SciTech Connect

The purpose and method employed in-house to quickly ascertain instrument-coupled working performance of focused search-unit piezoelectric materials of similar physical characteristics is illustrated by comparative presentation of data obtained for lithium sulfate and lead metaniobate "units" utilizing a custom built 725 Immerscope.

Dudley, W. A.

1971-12-08T23:59:59.000Z

11

RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington  

Science Conference Proceedings (OSTI)

The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

Not Available

1993-06-01T23:59:59.000Z

12

Making european-style community wind power development work in theUnited States  

DOE Green Energy (OSTI)

Once primarily a European phenomenon, community wind power development--defined here as one or more locally owned, utility-scale wind turbines interconnected on either the customer or utility side of the meter--is gaining a foothold in an increasing number of states throughout the United States. This article describes the various policies and incentives that Minnesota, Wisconsin, Iowa, and Massachusetts are using to support community wind power development, and how state and federal support influences the types of projects and ownership structures that are being developed. Experience in these states demonstrates that, with an array of incentives and creative financing schemes targeted at community-scale projects, there are opportunities to make community wind work in the United States.

Bolinger, Mark A.

2004-04-26T23:59:59.000Z

13

"2012 Uranium Marketing Annual Report"  

U.S. Energy Information Administration (EIA) Indexed Site

17. Purchases of enrichment services by owners and operators of U.S. civilian nuclear power reactors by contract type in delivery year, 2012" "thousand separative work units (SWU)"...

14

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

Science Conference Proceedings (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

15

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

Science Conference Proceedings (OSTI)

his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

16

The United States Intelligence Community (IC), an integrated network of agencies that work together to protect our Nation's  

E-Print Network (OSTI)

The United States Intelligence Community (IC), an integrated network of agencies that work together· Note: Not all opportunities are available at all agencies. * Proficiency in one of the following Agency (CIA)· Defense Intelligence Agency (DIA)· Department of Homeland Security (DHS)· Federal Bureau

Memphis, University of

17

Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington  

SciTech Connect

This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

Not Available

1993-05-01T23:59:59.000Z

18

work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE THE U.S. DEPARTMENT OF ENERGY'S WORKING CAPITAL FUND U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES OCTOBER 1998 AUDIT REPORT CR-B-99-01 MEMORANDUM FOR THE DIRECTOR, BUSINESS MANAGEMENT STAFF FROM: William S. Maharay Acting Manager, Capital Regional Audit Office, Office of Inspector General SUBJECT: INFORMATION : Audit Report on the Department's Working Capital Fund BACKGROUND The Department established the Working Capital Fund (Fund) in January 1996 as a financial management tool for charging the costs of common services provided at Headquarters to Departmental program offices. The objectives in establishing the Fund were to increase efficiency of the Department's operations, improve management of administrative services

19

Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

Not Available

1994-03-01T23:59:59.000Z

20

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III  

SciTech Connect

The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

R. P. Wells

2006-09-19T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Engineering work plan for PFP criticality alarm panel first unit re-build  

SciTech Connect

This document describes the first step in increasing the quality, reliability, and ease of maintenance of the nine Criticality Alarm Panels (CAP) at PFP. Development control practices and guidelines of WHC-CM-6-1, EP-2.4 and WHC-IP-1026, EPG-2.4 are applied to develop a prototype of a replacement Criticality Alarm Panel (CAP) with facility-use potential. During the development of the prototype CAP, the design requirements of all of PFP`s nine CAPs are considered to develop standardized hardware and detailed design drawings that are tailored to PFP maintenance needs. Increased quality and reliability is achieved through quality hardware, proven technology and design techniques, and the use of the Class 1E workmanship standards of WHC-CM-8-1. The end result of the work described by this work plan is a verified/read-to-install replacement for CAP Z4 and verified/released H-2 drawings that are formatted such that they can easily be replicated when producing design drawings for the other eight CAPs.

Clem, W.E.

1994-09-14T23:59:59.000Z

22

ÂŤThis report was prepared as an account of work sponsored by an agency of the United States Government  

NLE Websites -- All DOE Office Websites (Extended Search)

Produced Water with Density and Conductivity Produced Water with Density and Conductivity Meters Final Report February 17, 2003 May 16, 2004 Jason T. Smith August 2004 DE-FG26-03NT15434 Team Energy RR1 Box 197 Bridgeport, IL 62417 1 DISCLAIMER "This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not

23

Operable Unit 7-13/14 in situ thermal desorption treatability study work plan  

SciTech Connect

This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.

Shaw, P.; Nickelson, D.; Hyde, R.

1999-05-01T23:59:59.000Z

24

Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington. Revision  

Science Conference Proceedings (OSTI)

This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium-{sup 99}{Tc}-Nitrate multi-contaminant IRM plume identified beneath U Plant.

Not Available

1994-01-01T23:59:59.000Z

25

DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the  

E-Print Network (OSTI)

States Government. Neither the United States Government nor any agency thereof, nor any or any agency thereof. The views and opinions of authors expressed herein do not necessarily state#12;DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United

Argonne National Laboratory

26

Baseline risk assessment for groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are evaluating conditions in groundwater and springs at the DOE chemical plant area and the DA ordnance works area near Weldon Spring, Missouri. The two areas are located in St. Charles County, about 48 km (30 mi) west of St. Louis. The 88-ha (217-acre) chemical plant area is chemically and radioactively contaminated as a result of uranium-processing activities conducted by the U.S. Atomic Energy Commission in the 1950s and 1960s and explosives-production activities conducted by the U.S. Army (Army) in the 1940s. The 6,974-ha (17,232-acre) ordnance works area is primarily chemically contaminated as a result of trinitrotoluene (TNT) and dinitrotoluene (DNT) manufacturing activities during World War II. This baseline risk assessment (BRA) is being conducted as part of the remedial investigation/feasibility study (RUFS) required under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended. The purpose of the BRA is to evaluate potential human health and ecological impacts from contamination associated with the groundwater operable units (GWOUs) of the chemical plant area and ordnance works area. An RI/FS work plan issued jointly in 1995 by the DOE and DA (DOE 1995) analyzed existing conditions at the GWOUs. The work plan included a conceptual hydrogeological model based on data available when the report was prepared; this model indicated that the aquifer of concern is common to both areas. Hence, to optimize further data collection and interpretation efforts, the DOE and DA have decided to conduct a joint RI/BRA. Characterization data obtained from the chemical plant area wells indicate that uranium is present at levels slightly higher than background, with a few concentrations exceeding the proposed U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 20 {micro}g/L (EPA 1996c). Concentrations of other radionuclides (e.g., radium and thorium) were measured at back-ground levels and were eliminated from further consideration. Chemical contaminants identified in wells at the chemical plant area and ordnance works area include nitroaromatic compounds, metals, and inorganic anions. Trichloroethylene (TCE) and 1,2-dichloroethylene (1,2 -DCE) have been detected recently in a few wells near the raffinate pits at the chemical plant.

NONE

1999-07-14T23:59:59.000Z

27

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any  

E-Print Network (OSTI)

States Government. Neither the United States Government nor any agency thereof, nor any or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. #12;ii Abstract The purpose of our

Texas at Austin, University of

28

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States nor any agency thereof,  

E-Print Network (OSTI)

States Government. Neither the United States nor any agency thereof, nor any of their employees, makes or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof States Government or any agency thereof. On the cover: Photography and layout: Sean Dietrick and Nick

Pennycook, Steve

29

New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B  

Science Conference Proceedings (OSTI)

This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Nelson, L. O.

2007-06-12T23:59:59.000Z

30

Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri  

Science Conference Proceedings (OSTI)

US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure.

NONE

1995-08-01T23:59:59.000Z

31

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan  

SciTech Connect

This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

D. E. Shanklin

2006-06-01T23:59:59.000Z

32

Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater Remedial Design/Remedial Action Scope of Work  

SciTech Connect

This Remedial Design/Remedial Action (RD/RA) Scope of Work pertains to OU 3-14 Idaho Nuclear Technology and Engineering Center and the Idaho National Laboratory and identifies the remediation strategy, project scope, schedule, and budget that implement the tank farm soil and groundwater remediation, in accordance with the May 2007 Record of Decision. Specifically, this RD/RA Scope of Work identifies and defines the remedial action approach and the plan for preparing the remedial design documents.

D. E. Shanklin

2007-07-25T23:59:59.000Z

33

Analysis of the working process and mechanical losses in a Stirling engine for a solar power unit  

SciTech Connect

In this paper a second level mathematical model for the computational simulation of the working process of a 1-kW Stirling engine has been used and the results obtained are presented. The internal circuit of the engine in the calculation scheme was divided into five chambers, namely, the expansion space, heater, regenerator, cooler and the compression space, and the governing system of ordinary differential equations for the energy and mass conservation were solved in each chamber by Euler`s method. In addition, mechanical losses in the construction of the engine have been determined and the computational results show that the mechanical losses for this particular design of the Stirling engine may be up to 50% of the indicated power of the engine.

Makhkamov, K.K. [Uzbek Academy of Sciences, Tashkent (Uzbekistan). Physical and Technical Inst.; Ingham, D.B. [Univ. of Leeds (United Kingdom). Dept. of Applied Mathematics

1999-05-01T23:59:59.000Z

34

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV  

Science Conference Proceedings (OSTI)

This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

R. P. Wells

2006-11-14T23:59:59.000Z

35

Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect

The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the nature and extent of contamination is presented in Section 1.2, and the results of the BRA are summarized in Section 1.3. The objective of this FS is discussed in Section 1.4, and preliminary remediation goals are identified in Section 1.5. The organization of the remaining chapters of this FS is outlined in Section 1.6.

NONE

1999-07-15T23:59:59.000Z

36

Industrial Sites Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (including Record of Technical Change Nos. 1, 2, 3, and 4)  

SciTech Connect

This Leachfield Corrective Action Units (CAUs) Work Plan has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the U.S. Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the U.S. Department of Defense (FFACO, 1996). Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. A work plan may be developed that can be referenced by leachfield Corrective Action Investigation Plans (CAIPs) to eliminate redundant CAU documentation. This Work Plan includes FFACO-required management, technical, quality assurance (QA), health and safety, public involvement, field sampling, and waste management documentation common to several CAUs with similar site histories and characteristics, namely the leachfield systems at the Nevada Test Site (NTS) and the Tonopah Test Range (TT R). For each CAU, a CAIP will be prepared to present detailed, site-specific information regarding contaminants of potential concern (COPCs), sampling locations, and investigation methods.

DOE /NV

1998-12-18T23:59:59.000Z

37

Results of the 2005-2008 Association of Residents in Radiation Oncology Survey of Chief Residents in the United States: Clinical Training and Resident Working Conditions  

Science Conference Proceedings (OSTI)

Purpose: To document clinical training and resident working conditions reported by chief residents during their residency. Methods and Materials: During the academic years 2005 to 2006, 2006 to 2007, and 2007 to 2008, the Association of Residents in Radiation Oncology conducted a nationwide survey of all radiation oncology chief residents in the United States. Chi-square statistics were used to assess changes in clinical training and resident working conditions over time. Results: Surveys were completed by representatives from 55 programs (response rate, 71.4%) in 2005 to 2006, 60 programs (75.9%) in 2006 to 2007, and 74 programs (93.7%) in 2007 to 2008. Nearly all chief residents reported receiving adequate clinical experience in commonly treated disease sites, such as breast and genitourinary malignancies; and commonly performed procedures, such as three-dimensional conformal radiotherapy and intensity-modulated radiotherapy. Clinical experience in extracranial stereotactic radiotherapy increased over time (p capital costs, such as particle beam therapy and intraoperative radiotherapy, and infrequent clinical use, such as head and neck brachytherapy, were limited to a minority of institutions. Most residency programs associated with at least one satellite facility have incorporated resident rotations into their clinical training, and the majority of residents at these programs find them valuable experiences. The majority of residents reported working 60 or fewer hours per week on required clinical duties. Conclusions: Trends in clinical training and resident working conditions over 3 years are documented to allow residents and program directors to assess their residency training.

Gondi, Vinai, E-mail: gondi@humonc.wisc.edu [Department of Radiation Oncology, University of Wisconsin Comprehensive Cancer Center, Madison, Wisconsin (United States); Bernard, Johnny Ray [Mayo Clinic Jacksonville, Jacksonville, Florida (United States); Jabbari, Siavash [University of California San Francisco, San Francisco, California (United States); Keam, Jennifer [Memorial Sloan-Kettering Cancer Center, New York, New York (United States); Amorim Bernstein, Karen L. de [Albert Einstein College of Medicine, Bronx, New York (United States); Dad, Luqman K. [SUNY Roswell Park Cancer Institute, Buffalo, New York (United States); Li, Linna [Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Poppe, Matthew M. [University of Utah Huntsman Cancer Hospital (United States); Strauss, Jonathan B. [Northwestern University Feinberg School of Medicine, Chicago, Illinois (United States); Chollet, Casey T. [Loyola University Medical Center, Maywood, Illinois (United States)

2011-11-15T23:59:59.000Z

38

Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory  

SciTech Connect

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

1993-07-01T23:59:59.000Z

39

Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODs) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regimes, which are labeled as integrator OUs. This remedial investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the feasibility study to evaluate all probable or likely alternatives.

Not Available

1993-07-01T23:59:59.000Z

40

Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

Not Available

1993-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

Not Available

1993-08-01T23:59:59.000Z

42

An Affirmative Action/Equal Opportunity Employer This report was prepared as an account of work sponsored by an agency of the United States  

E-Print Network (OSTI)

sponsored by an agency of the United States Government. Neither The Regents of the University of California, the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express endorsement, recommendation, or favoring by The Regents of the University of California, the United States

43

Remedial investigation work plan for Chestnut Ridge Operable Unit 4 (Rogers Quarry/Lower McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

The Oak Ridge Y-12 Plant includes - 800 acres near the northeast comer of the reservation and adjacent to the city of Oak Ridge (Fig. 1-1). The plant is a manufacturing and developmental engineering facility that produced components for various nuclear weapons systems and provides engineering support to other Energy Systems facilities. More than 200 contaminated sites have been identified at the Y-12 Plant that resulted from past waste management practices. Many of the sites have operable units (OUs) based on priority and on investigative and remediation requirements. This Remedial Investigation RI work plan specifically addresses Chestnut Ridge OU 4. Chestnut Ridge OU 4 consists of Rogers Quarry and Lower McCoy Branch (MCB). Rogers Quarry, which is also known as Old Rogers Quarry or Bethel Valley Quarry was used for quarrying from the late 1940s or early 1950s until about 1960. Since that time, the quarry has been used for disposal of coal ash and materials from Y-12 production operations, including classified materials. Disposal of coal ash ended in July 1993. An RI is being conducted at this site in response to CERCLA regulations. The overall objectives of the RI are to collect data necessary to evaluate the nature and extent of contaminants of concern, support an Ecological Risk Assessment and a Human Health Risk Assessment, support the evaluation of remedial alternatives, and ultimately develop a Record of Decision for the site. The purpose of this work plan is to outline RI activities necessary to define the nature and extent of suspected contaminants at Chestnut Ridge OU 4. Potential migration pathways also will be investigated. Data collected during the RI will be used to evaluate the risk posed to human health and the environment by OU 4.

Not Available

1993-09-01T23:59:59.000Z

44

Lit ~ AREVA Enrichment Services LLC-7 7,  

E-Print Network (OSTI)

(EREF) in Bonneville County, Idaho. AES hereby notifies the NRC of its intent to revise the License Application for the EREF by expanding the capacity of the facility from 3.3 million separative work units (SWU) per year to 6.6 million SWU per year. In recent months, AES ' confidence has increased regarding the construction of new reactors both in the United States and other countries. Based on this evolving scenario and the fact that the NRC has just begun its review of the EREF License Application, AES has decided to revise the application to increase facility capacity to 6.6 million SWU per year. While AES is still planning to build a 3.3 million SWU per year facility, this revision provides AES the ability to expand the EREF should market conditions favor increased capacity for uranium enrichment services. AES plans to submit the revision to the EREF License Application by April 23, 2009. In addition; AES will submit a roadmap to define the anticipated changes to the License Application by April 6, 2009. The roadmap will facilitate the NRC's Staff's review of the current application and understanding of the impacts of the intended revision.

Sam Shakir; Eagle Rock; Enrichment Facility; Eagle Rock; Enrichment Facility

2009-01-01T23:59:59.000Z

45

Streamlined Approach for Environmental Restoration Work Plan for Corrective Action Unit 461: Joint Test Assembly Sites and Corrective Action Unit 495: Unconfirmed Joint Test Assembly Sites Tonopah Test Range, Nevada  

SciTech Connect

This Streamlined Approach for Environmental Restoration plan addresses the action necessary for the clean closure of Corrective Action Unit 461 (Test Area Joint Test Assembly Sites) and Corrective Action Unit 495 (Unconfirmed Joint Test Assembly Sites). The Corrective Action Units are located at the Tonopah Test Range in south central Nevada. Closure for these sites will be completed by excavating and evaluating the condition of each artillery round (if found); detonating the rounds (if necessary); excavating the impacted soil and debris; collecting verification samples; backfilling the excavations; disposing of the impacted soil and debris at an approved low-level waste repository at the Nevada Test Site

Jeff Smith

1998-08-01T23:59:59.000Z

46

Electric household equipment and electric fuel usage in the Tri-State Region and the United States: 1960-70. Working paper  

SciTech Connect

The possible impact of areawide residential location policy on future residential electricity usage in the Tri-State Metropolitan Region centering on New York City is investigated. This report is concerned with selected residential electric appliance usage in the Tri-State Region as compared with usage of these appliances across the United States between 1960 and 1970. Included are tabular representations of comparisons between residential air conditioner usage in the Tri-State Region and the United States. Tabular comparisons also are made with respect to residential appliance usage and electric fuel usage.

Hillman, B.

1973-08-01T23:59:59.000Z

47

United States  

Office of Legacy Management (LM)

- I - I United States Department of Energy D lSCk Al M E R "This book was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency

48

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

L. O. Nelson

2003-09-01T23:59:59.000Z

49

Unit Conversion  

Science Conference Proceedings (OSTI)

Unit Conversion. ... Unit Conversion Example. "If you have an amount of unit of A, how much is that in unit B?"; Dimensional Analysis; ...

2012-12-04T23:59:59.000Z

50

united stadium. united station.  

E-Print Network (OSTI)

??DC United is one of Major League Soccerâs most decorated franchises, yet it still plays its home games within the crumbling confines of RFK Stadium.… (more)

Groff, David R.

2011-01-01T23:59:59.000Z

51

Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This document outlines the activities necessary to conduct a Remedial Investigation (RI) of the Chestnut Ridge Security Pits (CRSP) at the Oak Ridge Y-12 Plant. The CRSP, also designated Chestnut Ridge Operable Unit (OU) 1, is one of four OUs along Chestnut Ridge on the Oak Ridge Reservation (ORR). The purpose of the RI is to collect data to (1) evaluate the nature and extent of known and suspected contaminants, (2) support an Ecological Risk Assessment (ERA) and a Human Health Risk Assessment (HHRA), (3) support the feasibility study in the development and analysis of remedial alternatives, and (4) ultimately, develop a Record of Decision (ROD) for the site. This chapter summarizes the regulatory background of environmental investigation on the ORR and the approach currently being followed and provides an overview of the RI to be conducted at the CRSP. Subsequent chapters provide details on site history, sampling activities, procedures and methods, quality assurance (QA), health and safety, and waste management related to the RI.

Not Available

1994-03-01T23:59:59.000Z

52

Uranium Marketing Annual Report - Release Date: May 31, 2011  

Gasoline and Diesel Fuel Update (EIA)

6. Purchases of enrichment services by owners and operators of U.S. civilian nuclear power reactors by origin country and year, 2008-2012 6. Purchases of enrichment services by owners and operators of U.S. civilian nuclear power reactors by origin country and year, 2008-2012 thousand separative work units (SWU) Country of Enrichment Service (SWU-origin) 2008 2009 2010 2011 2012 China 0 0 0 W W France 556 895 W W 0 Germany 468 1,059 681 1,539 1,075 Netherlands 1,038 1,345 2,292 1,506 1,496 Russia 4,793 5,478 5,055 5,308 6,560 United Kingdom 2,195 2,940 2,119 2,813 2,648 Europe1 W W W 670 W Other 2 W W W 0 W Foreign Total 10,709 13,115 11,526 12,395 12,330 United States 1,890 4,102 2,251 2,434 3,261 Total 12,599 17,217 13,776 14,829 15,590 Average Price (US$ per SWU) 121.33 130.78 136.14 136.12 141.36 1 Specific country in Europe was not reported.

53

Quantification of the Potential Impact on Commercial Markets of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Introduction of the Enrichment Services Component of DOE Low Enriched Introduction of the Enrichment Services Component of DOE Low Enriched Uranium Inventory During Calendar Year 2013 Quantification of the Potential Impact on Commercial Markets of Introduction of the Enrichment Services Component of DOE Low Enriched Uranium Inventory During Calendar Year 2013 This report presents the results of a business analysis performed by Energy Resources International, Inc. (ERI) of the potential impact on the commercial enrichment market of the transfer of the enrichment services component (Separative Work Units or SWU) contained in DOE low enriched uranium (LEU) inventory during 2013. Under this transaction, 299,000 kg SWU would be introduced into the commercial market, but no transfer of natural uranium to the commercial market would take place.

54

Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

Not Available

1993-05-01T23:59:59.000Z

55

Energy infrastructure of the United States and projected siting needs: Scoping ideas, identifying issues and options. Documentation report for Chapter 2: Draft report of the Working Group on Energy Facility Siting to the Secretary  

Science Conference Proceedings (OSTI)

This report documents the sources and derivation of the energy demand and infrastructure estimates found in Chapter 2 of ENERGY INFRASTRUCTURE OF THE UNITED STATES AND PROJECTED SITING NEEDS: SCOPING IDEAS, IDENTIFYING ISSUES AND OPTIONS Draft Report of the Department of Energy Working Group on Energy Facility Siting to the Secretary. The first part of this report provides an explanation in narrative form of each table, figure, or infrastructure estimate in Chapter 2, including a complete list of references and personal contacts. Appendix A contains a print out of the calculations used to derive the figures, including references to data sources. Appendix B contains the results of a sensitivity analysis that uses an alternative energy use forecast as its basis. This report should only be used in conjunction with the full contents of Chapter 2.

Not Available

1993-12-01T23:59:59.000Z

56

STATEMENT OF WORK  

National Nuclear Security Administration (NNSA)

PART III - SECTION J APPENDIX B STATEMENT OF WORK Table of Contents 1.0 General.................................................................................................................... 273 2.0 Laboratory Mission and Scope of Work. ................................................................ 274 3.0 Science & Technology. ........................................................................................... 275 3.1 Defense Programs. .................................................................................................. 276 3.1.1 Stewardship of United States Nuclear Weapons. ................................................ 276 3.1.1.1 Stockpile Certification. .......................................................................................

57

Legend Units  

Science Conference Proceedings (OSTI)

... Syntax: LEGEND UNIT units> where is an integer number or parameter in the range 1 to 100 that specifies the legend identifier; and ...

2013-11-27T23:59:59.000Z

58

Uncertainty clouds uranium enrichment corporation's plans  

SciTech Connect

An expected windfall to the US Treasury from the sale of the Energy Dept.'s commercial fuel enrichment facilities may evaporate in the next few weeks when the Clinton administration submits its fiscal 1994 budget proposal to Congress, according to congressional and administration officials. Under the Energy Policy Act of 1992, DOE is required to lease two uranium enrichment facilities, Portsmouth, Ohio, and Paducah, KY., to the government-owned US Enrichment Corp. (USEC) by July 1. Estimates by OMB and Treasury indicate a potential yearly payoff of $300 million from the government-owned company's sale of fuel for commercial reactors. Those two facilities use a process of gaseous diffusion to enrich uranium to about 3 percent for use as fuel in commercial power plants. DOE has contracts through at least 1996 to provide about 12 million separative work units (SWUs) yearly to US utilities and others world-wide. But under an agreement signed between the US and Russia last August, at least 10 metric tons, or 1.5 million SWUs, of low-enriched uranium (LEU) blended down from Russia warheads is expected to be delivered to the US starting in 1994. It could be sold at $50 to $60 per SWU, far below what DOE currently charges for its SWUs - $135 per SWU for 70 percent of the contract price and $90 per SWU for the remaining 30 percent.

Lane, E.

1993-03-24T23:59:59.000Z

59

COOPERATIVE RESEARCH UNITS2009  

E-Print Network (OSTI)

. The CRU program expects to continue to work with cooperators in identify- ing high priority hiring actions Cooperators' Coalition (NCC) for the CRU program, which targets efforts in CRU to (i) find new ways to workCOOPERATIVE RESEARCH UNITS2009 Year In Review PROGRAM YEAR IN REVIEW In Fiscal Year (FY) 2009

60

English Units  

Science Conference Proceedings (OSTI)

English Units. A, B, C, D, E, F, G, H, I, J. 1, Steam Point Calculator: English Units, ... 6, Height of steam point apparatus above ground (ft.), 0, ft. ...

2011-12-22T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Unit Conversions  

Science Conference Proceedings (OSTI)

... volume flow units, which contain "atm", assume that the gas is: ideal; at a pressure of 101325 Pa; at a temperature of 0 °C. Be aware that the unit "atm ...

2012-10-02T23:59:59.000Z

62

Working Copy  

NLE Websites -- All DOE Office Websites (Extended Search)

NWP subcontractor personnel work at a number of DOE generator sites where NWP has no direct contractual authority for overall site operations. NWP has therefore negotiated...

63

Metric Units  

Science Conference Proceedings (OSTI)

... A, B, C, D, E, F, G, H, I, J. 1, Steam Point Calculator: Metric Units, Elevation Converter, ... 6, Height of steam point apparatus above ground (m), 0, m, ...

2011-12-22T23:59:59.000Z

64

Work Manager  

Science Conference Proceedings (OSTI)

A real-time control system has been developed and deployed nationally to support BT‘s work management programme. This paper traces the history, system architecture, development, deployment and service aspects of this very large programme. Many ...

G. J. Garwood

1997-01-01T23:59:59.000Z

65

Energy infrastructure of the United States and projected siting needs: Scoping ideas, identifying issues and options. Draft report of the Department of Energy Working Group on Energy Facility Siting to the Secretary  

SciTech Connect

A Department of Energy (DOE) Working Group on Energy Facility Siting, chaired by the Policy Office with membership from the major program and staff offices of the Department, reviewed data regarding energy service needs, infrastructure requirements, and constraints to siting. The Working Group found that the expeditious siting of energy facilities has important economic, energy, and environmental implications for key Administration priorities.

Not Available

1993-12-01T23:59:59.000Z

66

United States  

Office of Legacy Management (LM)

Office of Research and EPA 600/R-941209 Environmental Protection Development January 1993 Agency Washington, DC 20460 Offsite Environmental 57,,7 Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1992 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY OFFICE OF RESEARCH AND DEVELOPMENT ENVIRONMENTAL MONITORING SYSTEMS LABORATORY-LAS VEGAS P.O. BOX 93478 LAS VEGAS. NEVADA 891 93-3478 702/798-2100 Dear Reader: Since 1954, the U.S. Environmental Protection Agency (EPA) and its predecessor the U.S, Public Health Service (PHs) has conducted radiological monitoring in the offsite areas around United States nuclear test areas. The primary objective of this monitoring has been the protection of the health and safety of

67

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BP Energy Company BP Energy Company OE Docket No. EA- 3 14 Order Authorizing Electricity Exports to Mexico Order No. EA-3 14 February 22,2007 BP Energy Company Order No. EA-314 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(Q of the Department of Energy Organization Act (42 U.S.C. 7 15 l(b), 7172(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.S24a(e)) . On May 22,2006, BP Energy Company (BP Energy) applied to DOE for an authorization to transmit electric energy from the United States to Mexico as a power marketer. BP Energy proposes to purchase surplus electric energy from electric utilities and other suppliers within the United States and to export that energy to ~Mexico. The cnergy

68

Onsite Wastewater Treatment Systems: Aerobic Treatment Unit  

E-Print Network (OSTI)

Aerobic units treat wastewater using the same process, only scaled down, as municipal wastewater treatment systems. This publication explains how aerobic units work, what their design requirements are, and how to maintain them.

Lesikar, Bruce J.

2008-10-31T23:59:59.000Z

69

Working Copy  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE/WIPP-99-2286 Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan Revision 7 U.S. Department of Energy December 2013 This document supersedes DOE/WIPP-99-2286, Rev. 6. Working Copy Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan DOE/WIPP-99-2286, Rev. 7 2 TABLE OF CONTENTSCHANGE HISTORY SUMMARY .............................................. 3 ACRONYMS AND ABBREVIATIONS ............................................................................ 4 1.0 INTRODUCTION .................................................................................................. 6 2.0 NOTIFICATION OR REPORTING REQUIREMENTS AND COMMITMENTS ..... 7

70

Working Copy  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Effective Date: 11/05/13 WP 12-IS.01-6 Revision 10 Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls Cognizant Section: Industrial Safety/Industrial Hygiene Approved By: Tom Ferguson Working Copy Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls WP 12-IS.01-6, Rev. 10 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 7 ACRONYMS AND ABBREVIATIONS ............................................................................. 8 1.0 INTRODUCTION 1 ............................................................................................... 10 2.0 VISITORS ........................................................................................................... 11

71

Second United Nations  

NLE Websites -- All DOE Office Websites (Extended Search)

Nations Nations . DISCLAIMER This report was prepared a s an account of work sponsored by an agency of the United States Government. Neither t h e United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and

72

Work Address:  

NLE Websites -- All DOE Office Websites (Extended Search)

BO SAULSBURY BO SAULSBURY Work Address: Home Address: Oak Ridge National Laboratory 12952 Buckley Road National Transportation Research Center Knoxville, TN 37934 Building NTRC-2, Room 118 (865) 288-0750 Oak Ridge, TN 37831-6479 (865) 574-4694 saulsburyjw@ornl.gov Technical Specialties: Land use planning Environmental and socioeconomic impact assessment National Environmental Policy Act (NEPA) project management Vehicle fuel economy Education: 1986 B. A., History (minors in English and Business), The University of Tennessee 1989 M. S., Planning, The University of Tennessee (Thesis title: Land Use Compatibility Planning for Airfield Environs: Intergovernmental Cooperation to Protect Land Users From the Effects of Aircraft Operations)

73

United States  

Office of Legacy Management (LM)

WASHINGTON, TUESDAY, JUNE 28, 1983 @nngmeional Ruord United States of America .__ -- . . ,- PROCEEDINGS AND DEBATES OF THE 9@ CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmgton, D C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $xX Congresstonal Record (USPS 087-390) Postage and Fees Pad U S Government Prlnhng 0ffv.X 375 SECOND CLASS NEWSPAPER H.4578 ' C.QNGRESSIONAL RECORD - HOUSE June 28, 1983 H.J. Res. 273: Mr. BOUND. Mr. W~.XMAN. Mr. OBERSTAR, Mr. BEDELL. Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB, Mr. CONTE. Mr. RAHALL; Mr. GRAY, Mr. VANDER JACT. Mr. TRAKLER, and Mr. Vxrrro. H. Con. Res. 107: Mr. KASICH. Mr. AUCOIN. Mr. CARPER, and Mr. SIZHFIJER. H. Con. Res. 118: Mr. FISH. Mr. LANTOS.

74

United States  

Office of Legacy Management (LM)

ongrees;ional Record ongrees;ional Record United States of America __._ -.. I. :- PROCEEDINGS AND DEBATES OF THE 9tth CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmcqton. Cl C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $300 Congressmal Record (USPS 087-390) Postage and Fees Pad U S Governme3n:jPnntmg OfIce SECOND CLASS NEWSPAPER H.4578 ' June 28, 1983 -: I H.J. Res. 273: Mr. BOLAND, Mr. WA-. Mr. OBERSTAFC, M' r. BEDELL, Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB. Mr. CONTE. Mr. RAHALL,. Mr. GRAY, Mr. VANDER JAGT. Mr. TRAKLER. and Mr. VENTO. H. Con. Res. iO7: Mr. KASICH. Mr. ALCOIN. Mr. CARPER. and Mr. SCHEUER. H. Con. Res. 118: Mr. FISH, Mr. LANTOS. Mr. KILDEE. Mr. SOLARZ Mr. Bmrr, Mr. BELWLL, Mr. RANG~L, Mr. DYMALLY. Mr.

75

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E-T Global Energy, LLC E-T Global Energy, LLC OE Docket No. EA-381 Order Authorizing Electricity Exports to Mexico Order No. EA-381 June 10, 2011 I. BACKGROUND E-T Global Energy, LLC Order No. EA-381 Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department ofEnergy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) ofthe Federal Power Act (FPA) (16 U.S.C.824a(e)) 1 * On May 10,2011, DOE received an application from E-T Global Energy, LLC (E-T Global) for authority to transmit electric energy from the United States to Mexico for five years as a power marketer using existing international transmission facilities. E-

76

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CC-1-I Availability: This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

77

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TexMex Energy, LLC TexMex Energy, LLC OE Docket No. EA-294-A Order Authorizing Electricity Exports to Mexico Order No. EA-294-A February 22, 2007 TexMex Energy, LLC Order No. EA-294-A I. BACKGROUND Exports of electricity from the United States to a foreign count~y are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7 15 1 (b), 71 72(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.824a(e)) . On August 25,2004, DOE issued Order No. EA-294 authorizing TexMex Energy LLC (TexMex) to transmit electric energy fiom the United States to Mexico as a power marketer. That authority expired on August 25, 2006. On September 8, 2006, TexMex applied to renew the electricity export authority

78

United States  

Gasoline and Diesel Fuel Update (EIA)

United States United States Coal ................................................ 4,367 4,077 4,747 4,181 4,473 4,125 4,983 4,330 4,414 4,003 4,796 4,178 4,344 4,479 4,348 Natural Gas .................................... 2,802 2,843 3,694 2,863 2,713 2,880 3,636 2,707 2,792 2,972 3,815 2,849 3,052 2,986 3,109 Petroleum (a) .................................. 74 73 81 67 73 70 75 66 75 70 76 66 74 71 71 Other Gases ................................... 32 33 36 32 32 34 37 33 33 35 39 34 33 34 35 Nuclear ........................................... 2,176 2,044 2,257 2,170 2,106 2,037 2,167 2,010 2,144 2,074 2,206 2,055 2,162 2,080 2,120 Renewable Energy Sources: Conventional Hydropower ........... 736 886 716 633 765 887 708 646 767 919 729 659 742 751 768 Wind ............................................ 491 520 353 449 477 521 379 475

79

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tenaslta Power Services Co. Tenaslta Power Services Co. OE Docket No. EA-243-A Order Authorizing Electricity Exports to Canada Order No. EA-243-A March 1,2007 Tenaska Power Services Co. Order No. EA-243-A I. BACKGROUND Exports of elcctricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 30 I(b) and 402(f) of the Departrncnt of' Energy Organizatio~l Act (42 U, S.C. 7 15 1 (b), 7 1 72Cf)) and rcquirc authorization under section 202(e) of the Federal Power Act (FPA) ( Z 6 U. s.c.824a(e)j1. On August 16,2001, DOE issued Order No. EA-243 authorizing Tenaska Power Scrvices Co. (Tenaska) to transmit electric cncrgy from the United States to Canada as a power marketer. That authority expired on August 16,2003. On August 14,2006, Teilaska applied to renew the electricity export authority

80

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTV-1-H Availability: This rate schedule shall be available to the Tennessee Valley Authority (hereinafter called TVA). Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and TVA. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a frequency of approximately 60 hertz at the outgoing terminals of the Cumberland

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTVI-1-A Availability: This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and the Customer. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

82

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bangor Hydro-Electric Company Bangor Hydro-Electric Company OE Docket No. PP-89-1 Amendment to Presidential Permit Order No. PP-89-1 December 30,2005 PRESIDENTIAL PERMIT AMENDMENT Bangor Hydro-Electric Company Order No. PP-89-1 I. BACKGROUND The Department of Energy (DOE) has responsibility for implementing Executive Order (E.O.) 10485, as amended by E.O. 12038, which requires the issuance of a Presidential permit by DOE before electric trans~nission facilities may be constructed, operated, maintained, or connected at the borders of the United States. DOE may issue such a permit if it determines that the permit is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. On December 16, 1988, Bangor Hydro-Electric Company (BHE) applied to DOE

83

UNITED STATES  

Office of Legacy Management (LM)

f).~<~~ \--\c :y-,ai F p"- KG f).~<~~ \--\c :y-,ai F p"- KG WASHINOTDN 28.0. C. ' -lr ' \ ' ' --- ".I ?--" ' z I. .~;-4.' J frr*o& 2 ii, - - -4 70-147 LRL:JCD JAN !! 8 1958 Oregon Metallurgical Corporation P. 0. Box 484 Albany, Oregon Attention: Mr. Stephen M. Shelton General Manager Gentlemen: Enclosed is Special Nuclear Material License No. SNM-144, as amended. Very 33uly yours, r:; I,;, ll)~gQ""d".- Lyall Johnson Chief, Licensing Branch Division of Licensing & Regulation Enclosure: SNM-144, as amended Distribution: bRO0 Attn: Dr. H.M.Roth DFMusser NMM MMMann INS JCRyan FIN (2) HSteele LRL SRGustavson LRL Document room Formal file Suppl. file Br & Div rf's ' .b liwwArry s/VW- ' q+ ' yj/ 2; 2-' , COP' 1 J JAM01958 -- UNITED STATES ATOMIC ENERGY COMMISSION

84

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule JW-2-F Availability: This rate schedule shall be available to the Florida Power Corporation (or Progress Energy Florida, hereinafter called the Company). Applicability: This rate schedule shall be applicable to electric energy generated at the Jim Woodruff Project (hereinafter called the Project) and sold to the Company in wholesale quantities. Points of Delivery: Power sold to the Company by the Government will be delivered at the connection of the Company's transmission system with the Project bus. Character of Service: Electric power delivered to the Company will be three-phase alternating current at a nominal frequency of 60 cycles per second.

85

Public works for water and power development and energy research appropriations for fiscal year 1978. Part 2. Corps of Engineers: Chief of Engineers and Director of Civil Works; New England Division; North Atlantic Division; North Pacific Division; Ohio River Division; South Atlantic Division. Hearins before a Committee on Appropriations, United States Senate, Ninety-Fifth Congress, H. R. 7553  

SciTech Connect

The Subcommittee of the Committee on Appropriations met on February 25, 1977, to consider the budget requests of the Army Corps of Engineers for the South Atlantic Division and the Ohio River Division and the Ohio River Division. On February 28, 1977, New England and North Atlantic Divisions presented statements. On March 2, 1977, statements were heard from representatives of the North Pacific Division. On March 8, 1977, extensive statements on the overall operation of the Corps of Engineers were given by Lt. Gen. J.W. Morris, Chief of Engineers and Maj. Gen. Ernest Graves, Director of Civil Works. (MCW)

1977-01-01T23:59:59.000Z

86

United States Government  

Office of Legacy Management (LM)

D;F&g,8 C-r-I 3-3 D;F&g,8 C-r-I 3-3 .*. United States Government . memorandum DATE: JUNZO 1994 -... REPLY TO A?TN OF: EM-421 (W. A. Williams, 903-8149) Authority Determination -- Combustion Engineering Site, Windsor, SUBJECT: Connecticut To' The File The attached review, documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the Combustion Engineering (CE) Site in Windsor, Connecticut, under the Formerly Utilized Sites Remedial Action Program. CE was a prime contractor for the Atomic Energy Commission (AEC) and performed high-enriched uranium fuel fabrication work from 1955 to 1967. The services furnished at the CE site included some experimental work; however, it primarily consisted of fabrication of high-enriched uranium

87

NSLS Work Planning & Controls  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Planning & Controls NSLS Work Planning and Control Procedure Lead Working Guidelines Information on Working in Areas Subject to Radiation from VUV Injection Procedure for...

88

Submitted Work & Work in Preparation - CECM  

E-Print Network (OSTI)

May 23, 2001 ... Submitted Work & Work in Preparation. I. G. Lisle and G. J. Reid, Symmetry Classification Using Invariant Moving Frames, to be submitted.

89

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: CLASSIFICATION / TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2011 FRANKLIN STAFF SERVICE AWARDS START DATE IN DEPARTMENT / UNIT: ACTUAL NUMBER MEMBER DEADLINE: FRIDAY MARCH 4, 2011 ADDITIONAL COMMENTS: Signature of Head / Director of Nominee's Unit

Arnold, Jonathan

90

Unit Outline Training Guide  

E-Print Network (OSTI)

Unit Outline Builder Training Guide Document Status: Final Revision Number: 6.0 Revision Date: 14 Approved #12;Online Unit Outline Builder Training Guide Curtin University of Technology Page 2 TABLE................................................................................................................. 4 4. Log in and Select a Unit Outline

91

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: CLASSIFICATION / TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2013 FRANKLIN STAFF SERVICE AWARDS START DATE IN DEPARTMENT / UNIT: ACTUAL NUMBER MEMBER DEADLINE: MARCH 5, 2013 ADDITIONAL COMMENTS: Signature of Head / Director of Nominee's Unit

Arnold, Jonathan

92

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: CLASSIFICATION / TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2012 FRANKLIN STAFF SERVICE AWARDS START DATE IN DEPARTMENT / UNIT: ACTUAL NUMBER MEMBER DEADLINE: FRIDAY MARCH 2, 2012 ADDITIONAL COMMENTS: Signature of Head / Director of Nominee's Unit

Arnold, Jonathan

93

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: CLASSIFICATION / TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2014 FRANKLIN STAFF SERVICE AWARDS START DATE IN DEPARTMENT / UNIT: ACTUAL NUMBER MEMBER DEADLINE: MARCH 7, 2014 ADDITIONAL COMMENTS: Signature of Head / Director of Nominee's Unit

Arnold, Jonathan

94

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LICE F 137: r.e Electr LICE F 137: r.e Electr onic Form App roved by CllR - 1010fJI2002 i/JI~~I United States Government Department of Energy Bonneville Power Admi istration memorandum DATE : REPLY TO AnN OF : KEPR-4 SUBJECT: Environmental Clearance Memorandum TO: Stephen Duncan Project Manager - TERS-3 Proposed Action: Removal of de-stabilized and downed trees resulting from a December 200 8 wind storm on the de-energized Lyons Ultra High Voltage Test Line NO.1. PP&A Project No.: PP&A 1309 Budget Information: Work Order # 184006 Categorical Exclusion Applied (from Subpart 0, 10 C.F.R. Part 1021): B 1.3 Routine maintenance/custodial services for buildings, structures, infrastructures, equipment. Location: Fee-owned ROW on the de-energized Lyons UHV Te st Line No .1 to the south of

95

United States Government Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B.89) B.89) EFO (07-90) United States Government Department of Energ Memorandum SEP 24 20t DATE: REPLY TO: IG-34 (A04TG032) Audit Report No.: OAS-L-04-21 SUBJECT: Evaluation of "The Federal Energy Regulatory Commission's Cyber Security Program - 2004" TO: Chairman, Federal Energy Regulatory Commission The purpose of this report is to inform you of the results of our annual evaluation of the Federal Energy Regulatory Commission's unclassified cyber security program. This evaluation was initiated in June 2004 and our field work was conducted through September 2004. The evaluation methodology is described in the attachment to this report. Introduction and Objective The Commission's increasing reliance on information technology (IT) is consistent with satisfying the President's Management Agenda initiative of expanding electronic

96

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nUnited States Government Department of Energy Bonneville Power Administration memorandum REPLY TO AnN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum TO: Robert Macy Project Manager - TELF-TPP-3 Proposed Action: Access road improvement and bridge replacement for the Raver-Paul No. transmission line structure 18/1. Budget Information: Work Order # 00220048 PP&A Project No.: 954 Proposed by: Bonneville Power Administration (BPA) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities .. .for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective ....are required to

97

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

:)£ F 13 :)£ F 13 ;' 5 H e Etectroou: Form Approved by CGJR - 01120195 (n·/w! United States Government Department of Energy Bonneville Power Administration memorandum DATE: 0 I. 7 20D 9 REPLY TO AnN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum TO : Robert Macy Project Manager - TELF-TPP-3 Proposed Action: Perform routine access road maintenance to the Rockdale Microwave site . Budget Information: Work Order #180709 PP&A Project No.: 1389 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities .. .for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective .... are required to maintain ... infrastructures . ..in a condition suitable for a facility to be used for its designed purpose.

98

Working crude oil storage capacity at Cushing, Oklahoma ...  

U.S. Energy Information Administration (EIA)

... coal in the United States? ... 2012 working crude oil storage capacity at the Cushing, Oklahoma storage and trading hub was 61.9 million barrels, ...

99

Estimates of Peak Underground Working Gas Storage Capacity in the ...  

U.S. Energy Information Administration (EIA)

Estimates of Peak Underground Working Gas Storage Capacity in the United States, 2009 Update The aggregate peak capacity for U.S. underground natural gas storage is ...

100

Estimate of Maximum Underground Working Gas Storage Capacity in ...  

U.S. Energy Information Administration (EIA)

Estimate of Maximum Underground Working Gas Storage Capacity in the United States: 2007 Update This report provides an update to an estimate for U.S. aggregate ...

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Work Force Retention Work Group Charter  

Energy.gov (U.S. Department of Energy (DOE))

The Work force Retention Work Group is established to support the Department’s critical focus on maintaining a high-performing work force at a time when a significant number of the workers needed to support DOE’s national security mission are reaching retirement age.

102

Live Working Resource Center  

Science Conference Proceedings (OSTI)

This report is a summary of work performed in 2008 on the EPRI Live Working Resource Center (LWRC) web site.

2008-12-16T23:59:59.000Z

103

STATEMENT OF CONSIDERATIONS REQUEST BY UNITED TECHNOLOGIES CORPORATION (UNITED  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RTGHTS TO INVENTIONS MADE UNDER RTGHTS TO INVENTIONS MADE UNDER COOPERATIVE AGREEMENT NUMBER DE-FC04-02AL67628, DOE WAIVER NO. W(A) 02-038. The Petitioner, United Technologies, acting through the United Technologies Research Center (UTRC), has requested a waiver of all domestic and foreign patent iights to inventions that may be conceived or first actually reduced to practice in the course of UTRC's work as the prime contractor under Cooperative Agreement Number DI-FC04- 02AL67628 entitled "On-Board Vehicle, Cost Effective, Hydrogen Enhancement Technology PEM Fuel Cells" with the U S. Department of Energy (DOE). The work to be done will be the development and fabrication of an integrated high temperature water gas shift reactor/hydrogen separator for use in a PEM fuel cell power

104

STATEMENT OF CONSIDERATIONS REQUEST BY UNITED TECHNOLOGIES CORPORATION (UNITED  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RIGHTS TO INVENTIONS MADE UNDER RIGHTS TO INVENTIONS MADE UNDER COOPERATIVE AGREEMENT NUMBER DE-FC04-02AL67610, DOE WAIVER NO. W(A) 02-026. The Petitioner, United Technologies, acting through the United Technologies Research Center (UTRC), has requested a waiver of all domestic and foreign pateni rights to inventions that may be conceived or first actually reduced to practice in the course of UTRC's work as the prime contractor under Cooperative Agreement Number DE-FC04- 02AL67610 entitled "High Density Hydrogen Storage System Demonstration Using NaAIH4 Based Complex Compound Hydrides" with the U.S. Department of Energy (DOE). The work to be done will be the design, development and evaluation of a nydrogen storage medium and system based on NaAIH4 with a 5 kg hydrogen storage capacity and

105

Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text  

Science Conference Proceedings (OSTI)

The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1, data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.

Not Available

1993-09-01T23:59:59.000Z

106

MEMS Test Working Group  

Science Conference Proceedings (OSTI)

... 1c. Packaging the RMs. lid. non-conductive epoxy. chip. PZT. Contents: RM unit: RM chip atop PZT; Within hybrid package; Lid secured with plastic clip ...

2013-05-03T23:59:59.000Z

107

ORISE: Work for Others  

NLE Websites -- All DOE Office Websites (Extended Search)

Institute for Science Education Work for Others The U.S. Department of Energy's (DOE) Work for Others (WFO) program allows the performance of work for non-DOE entities when the...

108

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: JOB TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2014 FRANKLIN STAFF EXCELLENCE AWARDS START DATE IN DEPARTMENT / UNIT: Nominee Information NAME / RESEARCHPROFESSIONAL Signature of Head / Director of Nominee's Unit: NOMINATION PACKET DEADLINE: MARCH 7, 2014 PLEASE

Arnold, Jonathan

109

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: JOB TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2012 FRANKLIN STAFF EXCELLENCE AWARDS START DATE IN DEPARTMENT / UNIT: Nominee Information NAME / RESEARCHPROFESSIONAL Signature of Head / Director of Nominee's Unit: NOMINATION PACKET DEADLINE: FRIDAY MARCH 2, 2012

Arnold, Jonathan

110

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: JOB TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2011 FRANKLIN STAFF EXCELLENCE AWARDS START DATE IN DEPARTMENT / UNIT: Nominee Information NAME / RESEARCHPROFESSIONAL Signature of Head / Director of Nominee's Unit: NOMINATION PACKET DEADLINE: FRIDAY MARCH 4, 2011

Arnold, Jonathan

111

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: JOB TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2013 FRANKLIN STAFF EXCELLENCE AWARDS START DATE IN DEPARTMENT / UNIT: Nominee Information NAME / RESEARCHPROFESSIONAL Signature of Head / Director of Nominee's Unit: NOMINATION PACKET DEADLINE: MARCH 5, 2013 PLEASE

Arnold, Jonathan

112

Live Working Resource Center  

Science Conference Proceedings (OSTI)

EPRI created the Live Working Resource Center web site to provide utilities the critical information they need to conduct live work safely and efficiently. This report is a summary of work performed in 2007 on the web site. See EPRI's Live Working Resource Center.

2007-11-30T23:59:59.000Z

113

Scientific Working Groups  

Science Conference Proceedings (OSTI)

... TWGDAM 1988). SWGDOG, Scientific Working Group on Dogs and Orthogonal Detection Guidelines, 2004. SWGTOX, Scientific ...

2013-07-10T23:59:59.000Z

114

Stirling engine with air working fluid  

DOE Patents (OSTI)

A Stirling engine capable of utilizing air as a working fluid which includes a compact heat exchange module which includes heating tube units, regenerator and cooler positioned about the combustion chamber. This arrangement has the purpose and effect of allowing the construction of an efficient, high-speed, high power-density engine without the use of difficult to seal light gases as working fluids.

Corey, John A. (North Troy, NY)

1985-01-01T23:59:59.000Z

115

Second United Nations International Conference  

NLE Websites -- All DOE Office Websites (Extended Search)

ORIGINAL: ENGLISH ORIGINAL: ENGLISH THE FREE ANTINmpliRINO ABSORPTION CROSS SECTION - P a r t I. P a r t 1 1 . Measurement of the Free Antineutrino Absorption Cross Section. by F. Reines and C. L. Cowan, Jr., Los Almcas Scientific Laboratory. Expected Cross Sectionfrmkasurernents of Fission Fragment Electron Spectrum. Los Alamos Scientific Laboratory. R. E. Carter, F. Reines, J . J . Wagner, and M. E. W y m a n , Interpretation of Results. n i . DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal IiabiIity or responsibility for the accuracy, compJeteness, or usefulness of any information,

116

Second United Nations International Conference  

NLE Websites -- All DOE Office Websites (Extended Search)

Confidential until official release during Conference Confidential until official release during Conference A/CONF 15/P/729 Abstract (USA) 7 March 1958 ORIGINAL: ENGLISH HIGH-ENERGY PHYSICS WITH HYDROGEN BUBBLE CHAMBERS~ Prepared by Abstract , _ - - ' ~ u i s W. Akvarez . I e - 4 - - a c bubble chambers in high-energy physics experiments. This paper @.scusses recent experience with liquid hydrogen # - . . . 1 sify of California, Berkeley, California / This document is DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process

117

CO2 Emissions - United Korea  

NLE Websites -- All DOE Office Websites (Extended Search)

Fossil Fuel CO2 Emissions Regional Centrally Planned Asia United Korea CO2 Emissions from United Korea Data graphic Data CO2 Emissions from United Korea...

118

Electrical Safe Work Practices  

NLE Websites -- All DOE Office Websites (Extended Search)

Electrical Safe Work Practices Electrical Safe Work Practices July 15, 2005 NOTE: Working hot is a last alternative All activities on or near electrically energized systems having live parts shall be conducted in accordance with the limitations and procedures specified in the latest version of NFPA 70E and with the safe work practices and conditions that follow. Only qualified personnel {as defined in NFPA 70E Article 110.6(D)} as authorized by supervisor can perform such work. Safe Work Practices: Know the equipment and potential hazards - Define the scope of work. Submit the scope of work to your supervisor for approval. Analyze the hazards use engineered methods to mitigate hazards. Establish procedures as necessary. Use barricades or other means to prevent unqualified persons crossing approach boundaries.

119

BNL United Way Campaign  

NLE Websites -- All DOE Office Websites (Extended Search)

about Long Island issues and challenges. Because we care, we come together to raise money towards The United Way of Long Island, which provides "services to children and...

120

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to this report. INTRODUCTION AND OBJECTIVE The European Laboratory for Particle Physics, CERN, in collaboration with the United States (U.S.) and other non-member states,...

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Redefining the SI Units  

Science Conference Proceedings (OSTI)

... and accuracy, simplify and normalize the unit definitions, and liberate the system from dependence on the prototype kilogram, an artifact adopted in ...

2013-06-24T23:59:59.000Z

122

Base unit definitions: Kilogram  

Science Conference Proceedings (OSTI)

... Unit of mass (kilogram), Abbreviations: CGPM, CIPM, BIPM. At the end of the 18th century, a kilogram was the mass of a cubic decimeter of water. ...

123

United States Patent  

NLE Websites -- All DOE Office Websites (Extended Search)

( 1 of 1 ) United States Patent 6,994,831 Gentile , et al. February 7, 2006 Oxidative tritium decontamination system Abstract The Oxidative Tritium Decontamination System, OTDS,...

124

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Appliances in Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census Division",,,,,,"East South...

125

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

8 Home Appliances in Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census Division",,,"Middle...

126

Rooftop Unit Campaign  

NLE Websites -- All DOE Office Websites (Extended Search)

919-943-7291 April 4, 2013 BTO Program Review 2 | Building Technologies Office eere.energy.gov Purpose & Objectives - Problem Statement * Packaged rooftop units (RTUs)...

127

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'OQOl - United States Government - Department of Energy National Nuclear Security Administration memorandum January 19, 201 1 DATE. REPLY TO ATTN OF: Y12-60:Gorman SUBJECT ANNUAL...

128

UnitOverview  

NLE Websites -- All DOE Office Websites (Extended Search)

UNIT OVERVIEW A general overview of LHC physics, accelerator and detector design, and how data inform claims and reasoning begins with an exploration of the "Big Questions" that...

129

Working Group 7 Summary  

SciTech Connect

The primary subject of working group 7 at the 2012 Advanced Accelerator Concepts Workshop was muon accelerators for a muon collider or neutrino factory. Additionally, this working group included topics that did not fit well into other working groups. Two subjects were discussed by more than one speaker: lattices to create a perfectly integrable nonlinear lattice, and a Penning trap to create antihydrogen.

Nagaitsev S.; Berg J.

2012-06-10T23:59:59.000Z

130

Live Working Resource Forum  

Science Conference Proceedings (OSTI)

This project involves development of a Live Working Resource Forum for documenting common and unique live work practices. It also serves as a repository of lessons learned derived from analysis of live work incidents. This Technical Update report is the design document of the Forum.

2006-12-14T23:59:59.000Z

131

HQ Work Control Permit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HQ Work Control Permit HQ Work Control Permit HQ Work Control Permit To ensure safe operations when undertaking work at DOE Headquarters, the Office of Headquarters Health and Safety has developed a Work Permit document (doc) to help ensure the safety of all workers and headquarters employees. The form should be completed and brought to the Office of Headquarters Safety, Health and Security office at GE-112 at the Forrestal facility, or the Germantown Building Manager's office at E-076 for review and sign off. Any questions can be directed to the HQ Health and Safety office on (202) 586-1005. HQ_Work_Control_Permit.docx More Documents & Publications Preliminary Notice of Violation, Petsco and Son, Inc - EA-96-06 OSS 19.3 Confined Space Entry 5/23/95 WA_02_026_UNITED_TECHNOLOGIES_Waiver_of_Domestic_and_Foreign

132

Summary Max Total Units  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Max Total Units Max Total Units *If All Splits, No Rack Units **If Only FW, AC Splits 1000 52 28 28 2000 87 59 35 3000 61 33 15 4000 61 33 15 Totals 261 153 93 ***Costs $1,957,500.00 $1,147,500.00 $697,500.00 Notes: added several refrigerants removed bins from analysis removed R-22 from list 1000lb, no Glycol, CO2 or ammonia Seawater R-404A only * includes seawater units ** no seawater units included *** Costs = (total units) X (estimate of $7500 per unit) 1000lb, air cooled split systems, fresh water Refrig Voltage Cond Unit IF-CU Combos 2 4 5 28 References Refrig Voltage C-U type Compressor HP R-404A 208/1/60 Hermetic SA 2.5 R-507 230/1/60 Hermetic MA 2.5 208/3/60 SemiHerm SA 1.5 230/3/60 SemiHerm MA 1.5 SemiHerm HA 1.5 1000lb, remote rack systems, fresh water Refrig/system Voltage Combos 12 2 24 References Refrig/system Voltage IF only

133

Composite stabilizer unit  

DOE Patents (OSTI)

This invention is comprised of an improved fin stabilized projectile including multiple stabilizer fins upon a stabilizer unit situated at the aft end of the projectile is provided, the improvement wherein the stabilizer fins are joined into the stabilizer unit by an injection molded engineering grade polymer.

Ebaugh, L.R.; Sadler, C.P.; Carter, G.D.

1990-12-31T23:59:59.000Z

134

Composite stabilizer unit  

DOE Patents (OSTI)

This invention is comprised of an improved fin stabilized projectile including multiple stabilizer fins upon a stabilizer unit situated at the aft end of the projectile is provided, the improvement wherein the stabilizer fins are joined into the stabilizer unit by an injection molded engineering grade polymer.

Ebaugh, L.R.; Sadler, C.P.; Carter, G.D.

1990-01-01T23:59:59.000Z

135

Composite stabilizer unit  

SciTech Connect

An improved fin stabilized projectile including multiple stabilizer fins upon a stabilizer unit situated at the aft end of the projectile is provided, the improvement wherein the stabilizer fins are joined into the stabillizer unit by an injection molded engineering grade polymer.

Ebaugh, Larry R. (Los Alamos, NM); Sadler, Collin P. (Los Alamos, NM); Carter, Gary D. (Espanola, NM)

1992-01-01T23:59:59.000Z

136

Associative list processing unit  

SciTech Connect

An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full. Also, an associative list processing unit and method comprising employing a plurality of prioritized cell blocks and using a tree of prioritized multiplexers descending from the plurality of cell blocks.

Hemmert, Karl Scott; Underwood, Keith D.

2013-01-29T23:59:59.000Z

137

Work/Life Balance  

NLE Websites -- All DOE Office Websites (Extended Search)

Work/Life Balance Work/Life Balance /careers/_assets/images/careers-icon.jpg Work/Life Balance Explore the multiple dimensions of a career at LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. What our employees say: Health & Wellness "The Lab pays 80 percent of my family's medical premiums with Blue Cross Blue Shield of New Mexico." Retirement & Savings "With the Lab matching my 401K contributions of six percent, I'm making good progress in saving for my retirement." Time Off "Like many of my colleagues here, I work nine hours on most work days so that I can take every other Friday off." Tax Savings "My flexible spending accounts allow me to set aside pre-tax dollars for

138

EPRI Live Working Project  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has been conducting research in the area of live working for several decades. This research has resulted in a large number of reports and other products. To help users locate the results of EPRI’s research in live working, an annual update is prepared containing brief descriptions of the products.BackgroundLive work—the performance of maintenance, construction, or testing on equipment and circuits that ...

2012-09-06T23:59:59.000Z

139

Hot Working I - TMS  

Science Conference Proceedings (OSTI)

The conversion of ingot structure to fine equiaxed wrought structure will be ... Special methods to breakdown the difficult-to-work titanium aluminide alloys will  ...

140

Working/Functional Fluids  

Science Conference Proceedings (OSTI)

... power cycle except that it uses an organic working fluid instead of water to allow operation at lower temperatures, including geothermal or solar ...

2012-10-05T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

tchr_work_template  

NLE Websites -- All DOE Office Websites (Extended Search)

are identified and prepared in advance. f. teachers receive advance communication about program logistics. 4. The Teacher's Work Experience a. relates to the scientific and...

142

Window solar heating unit  

SciTech Connect

The unit may be mounted either in a window or between the studs of a building that is to be supplied with solar heat. The bottom of the unit extends farther from the building than the top and is wider than the top of the unit such that the transparent side away from the building has an arcuate form and is gradually flared outwardly in a downward direction to increase the exposure to the sun during the day. A plurality of absorptive tubes within the unit are slanted from the upper portion of the unit downwardly and outwardly to the front arcuate portion of the bottom. Openings between the unit and the building are provided for air flow, and a thermostatically controlled fan is mounted in one of the openings. A baffle is mounted between the absorptive tubes and the mounting side of the solar heating unit, and the surfaces of the baffle and the absorptive tubes are painted a dull black for absorbing heat transmitted from the sun through the transparent, slanting side.

Davis, E.J.

1978-09-12T23:59:59.000Z

143

Next Generation Rooftop Unit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Next Generation Rooftop Unit - Next Generation Rooftop Unit - CRADA Bo Shen Oak Ridge National Laboratory shenb@ornl.gov; 865-574-5745 April 3, 2013 ET R&D project in support of DOE/BTO Goal of 50% Reduction in Building Energy Use by 2030. CRADA project with Trane TOP US Commercial HVAC Equipment OEM 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: half of all US commercial floor space cooled by packaged AC units, consumes more than 1.0 Quad source energy/year; highly efficient systems needed

144

Next Generation Rooftop Unit  

NLE Websites -- All DOE Office Websites (Extended Search)

Next Generation Rooftop Unit - Next Generation Rooftop Unit - CRADA Bo Shen Oak Ridge National Laboratory shenb@ornl.gov; 865-574-5745 April 3, 2013 ET R&D project in support of DOE/BTO Goal of 50% Reduction in Building Energy Use by 2030. CRADA project with Trane TOP US Commercial HVAC Equipment OEM 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: half of all US commercial floor space cooled by packaged AC units, consumes more than 1.0 Quad source energy/year; highly efficient systems needed

145

Trails Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Trails Working Group Trails Working Group Trails Working Group Our mission is to inventory, map, and prepare historical reports on the many trails used at LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The LANL Trails Working Group inventories, maps, and prepares historical reports on the many trails used at LANL. Some of these trails are ancient pueblo footpaths that continue to be used for recreational hiking today. Some serve as quiet and non-motorized alternatives between the Townsite and LANL or between technical areas. The Trails Working Group, established in December 2003, includes representatives from local citizen hiking groups, Los Alamos County, Forest Service, Park Service, Los Alamos National Laboratory and the NNSA Los

146

Interagency Working Groups (IWGs)  

NLE Websites -- All DOE Office Websites (Extended Search)

Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) are the primary USGCRP vehicles for implementing and coordinating research activities within and across agencies. These groups are critical to Program integration and in assessing the Program's progress. The working groups span a wide range of interconnected issues of climate and global change, and address major components of the Earth's environmental and human systems, as well as cross-disciplinary approaches for addressing these issues. IWGs correspond to program functions and are designed to bring agencies together to plan and develop coordinated activities, implement joint activities, and identify and fill gaps in the Program's plans. They allow public officials to communicate with each other on emerging directions within their agencies, on their stakeholder needs, and on best practices learned from agency activities. Together, these functions allow the agencies to work in a more coordinated and effective manner.

147

ORISE: Working with ORISE  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Institute for Science Education Oak Ridge Institute for Science Education Working with ORISE If you are interested in learning about how your agency can utilize the capabilities of the Oak Ridge Institute for Science and Education (ORISE) through a Work for Others agreement or a procurement contract, or if you are looking for career opportunities, the following information provides an explanation of how to work with ORISE. If you do not see an option that applies to your needs, please contact ORISE General Information. Work for Others For organizations and agencies that are not affiliated with U.S. Department of Energy (DOE), such groups still have the opportunity to partner with the Oak Ridge Institute for Science and Education (ORISE) through the DOE Work For Others (WFO) program. DOE's WFO program allows ORISE to support

148

United States Attorney's Office District of Columbia  

E-Print Network (OSTI)

government officials in an ill-fated attempt to stop the NASA Office of the Inspector General from continuing of Inspector General and prosecutive work of the U.S. Attorneys Office in the Southern District of Mississippi University ("MSU") on a remote sensing study, United States Attorney Donald R. Burkhalter and NASA Inspector

Christian, Eric

149

If a dispute with the United States,  

E-Print Network (OSTI)

to build the world's first working prototype reactor for nuclear fusion, which is billed as a clean, safe construction at Cadarache, in southeastern France. BACK FRANCE LIKELY TO WIN BATTLE WITH JAPAN OVER NUCLEAR, the United States and South Korea for the siting of a high-tech nuclear fusion research project. "Given

150

Before the Senate Environment and Public Works Committee | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Before the Committee on Environment and Public Works, United States Senate, Washington, D.C. By: Steven Chu, Secretary of Energy Subject: H.R. 2454, the American Clean...

151

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

the 2009 Poverty Guidelines for families published by the U.S. Department of Health and Human Services. 3Use of heating equipment for another housing unit also includes the use...

152

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

that do not contain a storage tank. The water is only heated as it passes through the heat exchanger. 3Use of a water heater for another housing unit also includes the use of...

153

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

that do not contain a storage tank. The water is only heated as it passes through the heat exchanger. 4Use of a water heater for another housing unit also includes the use of...

154

United Cool Air  

Energy.gov (U.S. Department of Energy (DOE))

While our process may start with a "basic model" it is seldom that we fabricate more than a few units that are identical.  Therefore, the definition of "basic model" has a large impact on the...

155

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

5 Appliances in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2" ,,"Less than...

156

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Appliances in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to 1949","1950...

157

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

6 Appliances in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold","Mixed- Humid","Mixed-Dry"...

158

United States Government  

Office of Legacy Management (LM)

"- .-A*" (MQ) EfG (07-W) United States Government rrla.g-a Department of Energy memorandum DATE: tlEC 1 F: l??? REPLYTo EM-421 (W. A. W illiams , 903-8149) AJTN OF: SUBJECT:...

159

Impact of High Wind Power Penetration on Hydroelectric Unit Operations  

SciTech Connect

The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-01-01T23:59:59.000Z

160

Work Authorization System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, D.C. DOE O 412.1A Approved: 4-21-05 This directive was reviewed and certified as current and necessary by Susan J. Grant, Director, Office of Management, Budget and Evaluation/Chief Financial Officer, 4-21-05. SUBJECT: WORK AUTHORIZATION SYSTEM 1. OBJECTIVES. To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. 2. CANCELLATIONS. DOE O 412.1 Work Authorization System, dated 4-20-99. Cancellation of a directive does not, by itself, modify or otherwise affect any contractual

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

How Hybrids Work  

NLE Websites -- All DOE Office Websites (Extended Search)

How Hybrids Work How Hybrids Work Diagram of full hybrid vehicle components, including (1) an internal combustion engine, (2) an electric motor, (3) a generator, (4) a power split device, and (5) a high-capacity battery. Flash Animation: How Hybrids Work (Requires Flash 6.0 or higher) HTML Version: How Hybrids Work Hybrid-electric vehicles (HEVs) combine the benefits of gasoline engines and electric motors and can be configured to obtain different objectives, such as improved fuel economy, increased power, or additional auxiliary power for electronic devices and power tools. Some of the advanced technologies typically used by hybrids include Regenerative Braking. The electric motor applies resistance to the drivetrain causing the wheels to slow down. In return, the energy from the

162

Working, Living, and Belonging  

E-Print Network (OSTI)

and Belonging June 28, 2013 Noah D. Zatz, UCLA, and EileenUniversity Press, 1998). Noah D. Zatz, "Working at theUniversity Press, 2012); Noah D. Zatz, "The Impossibility of

Zatz, Noah; Boris, Eileen

2013-01-01T23:59:59.000Z

163

NREL: Working for NREL  

NLE Websites -- All DOE Office Websites (Extended Search)

Working for NREL Working for NREL We're always on the lookout for talented people who believe in our mission and support our values. NREL's inclusive work environment benefits from diversity throughout the organization, values individual differences, and encourages employees to develop and contribute to their full potential. Working for NREL is a challenging and exciting experience for nearly 2,300 staff members of all backgrounds. We offer competitive salaries and excellent benefits. NREL Mission While our cultures and creeds, and lifestyles and languages may differ, we share a common desire to carry out our mission- To develop renewable energy and energy efficiency technologies and practices, To advance related science and engineering, and To transfer knowledge and innovations to address the nation's energy

164

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

.2/06 WED 17:02 FAX 423 241 3897 OIG .2/06 WED 17:02 FAX 423 241 3897 OIG -** HQ . 001 United States Government Department of Energy Department of Energy memorandum DATE: February 9, 2006 Audit Report Number: OAS-L-06-07 REPLY TO ATTN OF; IG-32 (A050R014) SUBJECT: Audit of "The Department's Management of United States Enrichment Corporation Site Services" TO: Manager, Portsmouth/Paducah Project Office INTRODUCTTON AND OBJECTIVE The Paducah Gaseous Diffusion Plant (Paducah), located in western Kentucky, was constructed by the Department of Energy (Department) in the early 1950s to enrich uranium for use in various military and commercial applications. The Department operated the plant until the Energy Policy Act of 1992 created the United States Enrichment Corporation (USEC) as a Government-owned

165

Interview: LaborWorks@NeighborWorks Provides Vermont Contractors...  

NLE Websites -- All DOE Office Websites (Extended Search)

Focus Series LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It NeighborWorks of Western Vermont (NWWVT), a nonprofit home ownership organization...

166

Development of Simpler, Cost Effective Oil Conditioning Units  

Science Conference Proceedings (OSTI)

It was recognized that the flexibility and complexity associated with the multipurpose on-line continuous oil-conditioning unit (Mark I), developed in this project in prior years, might not be needed in some cases. Furthermore, it was anticipated that simpler or single purpose units might have equal or higher merit. Subsequent efforts were focused towards the development of stand-alone units for dehydration, decontamination, and degassing/dehydration. This technical update describes work to date on the d...

2003-12-17T23:59:59.000Z

167

C. Uniform Unit Pricing Regulation  

Science Conference Proceedings (OSTI)

... to permit retail stores that voluntarily provide unit pricing to present prices using various ... with requirements that specify that the unit price is to be ...

2013-10-25T23:59:59.000Z

168

United Biofuels | Open Energy Information  

Open Energy Info (EERE)

United Biofuels Jump to: navigation, search Name United Biofuels Place York, Pennsylvania Product Waste and animal fats to biofuel producer, switched to animal fats from soy in...

169

Exemplary Units Markup Language usage  

Science Conference Proceedings (OSTI)

Sample UnitsML tools and usage. ... Its usage is limited to demonstrating capabilities of plain XSLT processing with the data stored in UnitsML. ...

170

United States lubricant demand  

Science Conference Proceedings (OSTI)

This paper examines United States Lubricant Demand for Automotive and Industrial Lubricants by year from 1978 to 1992 and 1997. Projected total United States Lubricant Demand for 1988 is 2,725 million (or MM) gallons. Automotive oils are expected to account for 1,469MM gallons or (53.9%), greases 59MM gallons (or 2.2%), and Industrial oils will account for the remaining 1,197MM gallons (or 43.9%) in 1988. This proportional relationship between Automotive and Industrial is projected to remain relatively constant until 1992 and out to 1997. Projections for individual years between 1978 to 1992 and 1997 are summarized.

Solomon, L.K.; Pruitt, P.R.

1988-01-01T23:59:59.000Z

171

Security by Design in the United States: Fact Sheet | National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Fact Sheets > Security by Design in the United States: ... Fact Sheet...

172

Strategies for decommoditizing and internationalizing a prepaid business unit  

E-Print Network (OSTI)

This thesis aims to establish a new strategy for a Brazilian IT service company to leverage the operation of its prepaid business unit in Brazil and overseas. The work starts using the Delta Model to segment the customers, ...

Cavalcanti Machado, Luis Filipe (Luis Filipe Dionisio)

2011-01-01T23:59:59.000Z

173

Mon Valley work plan  

Office of Legacy Management (LM)

GWSHP 1.8 GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for Characterization Activities at the Shiprock UMTRA Project Site June 1998 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number UGW-511-0020-01-000 Document Number U0013400 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0013400 Contents DOE/Grand Junction Office Work Plan for Characterization Activities at Shiprock Project Site June 1998 Draft Final Page v Contents Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.0 Introduction .

174

How Fuel Cells Work  

NLE Websites -- All DOE Office Websites (Extended Search)

How Fuel Cells Work How Fuel Cells Work Diagram: How a PEM fuel cell works. 1. Hydrogen fuel is channeled through field flow plates to the anode on one side of the fuel cell, while oxygen from the air is channeled to the cathode on the other side of the cell. 2. At the anode, a platinum catalyst causes the hydrogen to split into positive hydrogen ions (protons) and negatively charged electrons. 3. The Polymer Electrolyte Membrane (PEM) allows only the positively charged ions to pass through it to the cathode. The negatively charged electrons must travel along an external circuit to the cathode, creating an electrical current. 4. At the cathode, the electrons and positively charged hydrogen ions combine with oxygen to form water, which flows out of the cell.

175

ORISE: Work Smart Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Smart Standards Work Smart Standards ORISE Work Smart Standards Set for Environment, Safety, and Health Revision #1, March 21, 2000 Revision #2, Sept. 29, 2000 Revision #3, June 28, 2001 Revision #4, Nov. 9, 2001 Revision #5, Nov. 30, 2001 Revision #6, Jan. 31, 2002 Revision #7, June 28, 2002 Revision #8, Oct. 17, 2002 Revision #9, Nov. 21, 2002 Revision #10, Feb. 28, 2003 Revision #11, May 23, 2003 Revision #12, May 30, 2003 Revision #13, Oct. 30, 2003 Revision #14, Jan. 21, 2004 Revision #15, May 24, 2004 Revision #16, Aug. 17, 2004 Revision #17, Aug. 27, 2004 Revision #18, Oct. 14, 2004 Revision #19, March 28, 2005 Revision #20, May 31, 2005 Revision #21, Aug. 24, 2005 Revision #22, Feb. 17, 2006 Revision #23, March 22, 2006 Revision #24, May 19, 2006 Revision #25, July 26, 2006 Revision #26, Nov. 28, 2006

176

Working with NIST  

NLE Websites -- All DOE Office Websites (Extended Search)

NIST NIST Terry Lynch Office of Technology Partnerships How to Work with NIST How to Work with NIST „ „ Standards Standards „ „ Collaborative Research & Technology Devolvement Collaborative Research & Technology Devolvement Programs Programs „ „ Invention Licensing Invention Licensing Collaborative Research & Technology Collaborative Research & Technology Development Programs Development Programs „ „ Informal collaboration involving intramural research programs Informal collaboration involving intramural research programs „ „ Guest Research Agreements Guest Research Agreements „ „ Facility Use Agreements Facility Use Agreements „ „ Material Transfer Agreements Material Transfer Agreements „ „ Cooperative Research and Development Agreements (CRADA

177

United States Government  

Office of Legacy Management (LM)

Milling Machine, Cihc Fenwal, Ashland, HA Food Machining Corp., Nitro, WV General Electric Plant, Shelbyvi Gleason Works, Rochester, NV C.I. Haynes, Cranston, RI Heald Machine...

178

Solving Unit Commitment by a Unit Decommitment Method  

E-Print Network (OSTI)

demand, and operating constraints such as spinning reserve requirements, over a short time horizon of power unit i is generating in time period t pmin i pmax i : minimum maximum rated capacity of unit i rmax i : maximum reserve for unit i ripit : reserve available from unit i in time period t minrmax i

179

Work Life Balance | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Life Balance Work Life Balance Work Life Balance Working at Y-12 has many advantages. In addition to the many benefit options, Y-12 also offers opportunities for a great work-life balance. Community Involvement Y-12 is a proud member of the community. Employees participate in the United Way annual giving campaign and serve as volunteers for charitable groups in the communities where they live and work. Each year Y-12 employees participate in a day of volunteering for local charities (on average 300-plus employees participate each year). Flexible Work Options Y-12 encourages employees to achieve a healthy personal balance among home, work and the community. One of the ways we embrace work-life balance is by offering flexible work arrangements that provide alternatives to the

180

Ropes for Live Working  

Science Conference Proceedings (OSTI)

Fiber ropes represent an essential tool in many applications associated with the electric power industry. Ropes used in proximity to or in contact with high-voltage power lines require demanding dielectric properties as well as strength and durability. A comprehensive understanding of live working (LW) rope construction, performance, and use is necessary for safe and efficient operations wherever such ropes are used.

2008-11-18T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

METHOD OF WORKING BERYLLIUM  

DOE Patents (OSTI)

>A process is presented for fabricating beryllium metal. The billet cf beryllium metal is sheathed with a jacket of either copper or stainless steel. It may then be worked by drawing or the like at a tcmperature of 300 to 400 C.

Macherey, R.E.

1959-02-01T23:59:59.000Z

182

Work Package Templates  

Science Conference Proceedings (OSTI)

Work Package Templates provides fossil plant maintenance personnel with assorted inspection, minor repair or overhaul templates for various pieces of plant equipment. This guide will assist plant maintenance personnel in improving the efficiency, reliability and reducing the maintenance costs for associated with maintenance on selected pieces of equipment.

2007-02-15T23:59:59.000Z

183

Public Works Transportation Infrastructure Study  

E-Print Network (OSTI)

Public Works Transportation Infrastructure Study Minneapolis City of Lakes Minneapolis Public Works Transportation Infrastructure Study #12;Public Works Transportation Infrastructure Study Minneapolis City Works Transportation Infrastructure Study Minneapolis City of Lakes Background: · Currently, funding

Minnesota, University of

184

Working With Berkeley Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

Working with the Lab Working with the Lab A-Z Index Search Phone Book Comments Ernest Orlando Lawrence Berkeley National Laboratory Technology Transfer Patent Department Sponsored Projects Office Procurement: Doing Business with the Lab Visitor Information Scientififc Divisions and National User Facilities UC Campus-Labs Collaboration Programs Berkeley Lab stresses collaboration in everything we do. The Laboratory is involved in many research partnerships with private industry. Our mission also includes the transfer of Laboratory inventions to the private sector for rapid commercialization. The role of the Technology Transfer Office is to make technology and expertise developed here available to industry. Contact the Technology Transfer Office to pinpoint research areas of common interest, negotiate rights to Laboratory intellectual property, and to discuss current patent and copyright licensing opportunities.

185

Working Group Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Working Group Reports Special Working Session on the Role of Buoy Observations in the Tropical Western Pacific Measurement Scheme J. Downing Marine Sciences Laboratory Sequim, Washington R. M. Reynolds Brookhaven National Laboratory Upton, New York Attending W. Clements (TWPPO) F. Barnes (TWPPO) T. Ackerman (TWP Site Scientist) M. Ivey (ARCS Manager) H. Church J. Curry J. del Corral B. DeRoos S. Kinne J. Mather J. Michalsky M. Miller P. Minnett B. Porch J. Sheaffer P. Webster M. Wesely K. Zorika G. Zhang Focus of Discussion The session convened on March 2, with brief introductions by Bill Clements. The purpose of the session was to discuss the scientific merits of retrofitting TOGA/TAO buoys with shortwave radiometers. Three questions were posed at the outset of the session to focus the discussion.

186

HANFORD ENGINEER WORKS  

Office of Legacy Management (LM)

HANFORD ENGINEER WORKS HANFORD ENGINEER WORKS IJd *P-t - - ~~~ssiticatiC+n cwcetted rat G.E. NUCLEONICS PROJECT xi I ~@L.%&~--G-ENERAI,@ ELECTRIC z ,m ._.__.-. _ I--..-. By Authority of. COMPANY ._ Atmic Energy Commission Office of Hanford Dire&xl Operations Riohland, Washington Attention; Mr. Carleton Shugg, Manager ./ ALPKA-ROLLED EL'GIL%I jw -879 ' . *_ a. f' Richland, Washington February 6, 1948 , Thla Dclc.Jv-

187

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

188

CHA Guidelines Working Group  

E-Print Network (OSTI)

The Community Health Assessment Guidelines have been updated from the original document published in 1997. The revisions reflect various published sources, as well as accumulated experience with community health assessment within the province of Manitoba. Special thanks to the members of the CHA Guidelines Working Group, composed of representatives of regional health authorities from across the province and Manitoba Health and Healthy Living staff. These guidelines are made

Jody Allan; Sonia Busca Owczar; Ingrid Botting; Maggie Campbell; Bunmi Fatoye; Bill Funk; Tannis Erickson; Sue Lockhart; Ales Morga; Deborah Malazdrewicz; Leonie Stranc

2009-01-01T23:59:59.000Z

189

Essentials of the SI: Base & derived units  

Science Conference Proceedings (OSTI)

... Table 1. SI base units. SI base unit. Base quantity, Name, Symbol. length, meter, m. ... Table 2. Examples of SI derived units. SI derived unit. ...

190

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

uv /uu/u* ±.u.. J.OJ..L rAA , *. . uv /uu/u* ±.u.. J.OJ..L rAA , *. . 'A4 .. ± OO, I U444 flmI I.j102 ' -f- $I)002 EP<.1 (o-.vu) United States Government Department of Energy memorandum DATE: January 30, 2004 REP.YTO: IG-35 (A03DN039) Audit Report No.: OAS-L-04-10 SUBJECT: Audit of the Safeguards and Security Program at the Rocky Flats Environmental Technology Site To: Frazer Lockhart, Manager, Rocky Flats Field Office INTRODUCTION AND OBJECTIVE Because of the terrorist attacks against the United States on September 11, 2001, the Department of Energy (Department) instituted additional security requirements beyond those already in place for normal security operations. These "Security Conditions" requirements were established by Department Notice 473.8 (Notice). The requirements are based on

191

l UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

UNITED STATES GOVERNMENT UNITED STATES GOVERNMENT lb 15 SUBJECT: THORFJM PROCURENENT PMF'N:TBU Jesse C. Johnson, Gtnager of IRaw Materials Operations3s.Office 3 R. W. Cook, Director of Production ~',LL:::+ I--- DATE: MAR ! 9 1951 The following list of suppliers of thorium and the amounts of materials procured from them by the Mew York Operations Office during calendar year 1950 is being supplied in accordance with Mr. Spelmanls telephone request of March 19. Thorium Lannett Bleachery iinde Air Products Co. Lindsey Light & Chemical Co. lliscellaneous NY0 Liscensing Division Rare Earths, Inc. Wolff-Alport Total - (kilograms) 179 38,2;2 -3 4,210 /vyeoi 4 -q- 2 : i ' \ iti 1 i 0 ;;\I:' --' I F 10 i;;;?/ \ --' L & ;:I :,- :,j( EZi 5 1 :' -I I ri _ I ' R i; .- . )- .i

192

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ng ng United States Government Department of Energy Memorandum OFFICE OF INSPECTOR GENERAL DATE: APR 18 2003 REPLY TO ATTN OF: IG-34 (A02PR010) Audit Report No.: OAS-L-03-15 SUBJECT: Audit of the Weatherization Assistance Program TO: Director, Weatherization and Intergovernmental Program, EE-2K The purpose of this report is to inform you of the results of our audit of the Weatherization Assistance Program. INTRODUCTION AND OBJECTIVE The Weatherization Assistance Program (Program) was established to increase energy efficiency in dwellings owned or occupied by low-income persons to reduce their residential energy expenditures and improve their health and safety. Since its inception in 1976, the Program has reported that approximately 5 million dwelling units owned or occupied by low-income individuals have been weatherized.

193

United States Government Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OE r 1325.0 OE r 1325.0 (01.93) United States Government Department of memorandum DATE: March 23, 2006 Audit Report Number: OAS-L-06-09 REPLY TO ATTN OF: IG-32 (A060R040) SUBJECT: Audit of"The Department of Energy's Management of the Northeast Home Heating Oil Reserve" TO, Deputy Assistant Secrctary for Petroleum Reserves INTRODUCTION AND OBJECTIVE The Energy Act of 2000 authorized the Secretary of Energy to create a Northeast Home Heating Oil Reserve (Reserve). The Reserve was established as an "emergency buffer" to supplement commercial supplies should a severe supply disruption occur in the heavily heating oil-dependent northeast United States. The Reserve consists of 2 million barrels of emergency home heating oil, enough to provide Northeast consumers adequate supplies for approximately

194

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Government United States Government Department of Energy Memorandum DATE: July 29, 2005 REPLY TO ATTN TO: IG-34 (A05HQ002) Audit Report No. OAS-L-05-10 SUBJECT: Agreed-Upon Procedures for Federal Payroll TO: Director, Office of Management, Budget, and Evaluation/Chief Financial Officer, ME-1 INTRODUCTION AND OBJECTIVE The Office of Management and Budget (OMB) Bulletin No. 01-02, "Audit Requirements for Federal Financial Statement," dated October 16, 2000, requires an annual audit of civilian payroll of executive departments and other Government agencies. Auditors are required to follow the agreed-upon procedures in Appendix I-1 of OMB Bulletin No. 01-02, to assess the reasonableness of life insurance, health benefits, and retirement withholdings and contributions.

195

UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

Menxmmhmz 9 Menxmmhmz 9 1 / UNITED STATES GOVERNMENT i TO : ThcFFles . mx.f I A. B. Piccct, +3lation section : DATE: .@.eti 16, 1949 SUBJECT: VISIT To HAVY OFfDHAlfCE DEPOT, EARIZ, B.J. FmmlTo ,sYmOL: DH:ARP . . : OnJuly 8,&g the uriterattendedameeting at the Navy Oxdnce Depot at Farle, Ii. J. for the purpose of advising the navy on i-adlatlon hazards involved In the dmping of contadnated AEC wastes at /?ea. " Presint were: J. Cook - Traffic & Transportation, AEC ~J.Moren- Utilifation, AEC ..J. Ccnmigl.io - Chief of Middlesex Operaticns A. PIhot -~Hadiation Section, AEC Captain Blossoin - Navy Captain hall - Navy ThefoSkndngwas agreedupcmby AFC andthe l&v. 1. 2. 3. 4. Contaminatedmaterial dnmied, I (loose in case of large contaminated units) loaded on truck&and lsonltored at'

196

Thermal insulated glazing unit  

SciTech Connect

An improved insulated glazing unit is provided which can attain about R5 to about R10 thermal performance at the center of the glass while having dimensions about the same as those of a conventional double glazed insulated glazing unit. An outer glazing and inner glazing are sealed to a spacer to form a gas impermeable space. One or more rigid, non-structural glazings are attached to the inside of the spacer to divide the space between the inner and outer glazings to provide insulating gaps between glazings of from about 0.20 inches to about 0.40 inches. One or more glazing surfaces facing each thermal gap are coated with a low emissivity coating. Finally, the thermal gaps are filled with a low conductance gas such as krypton gas.

Selkowitz, Stephen E. (Piedmont, CA); Arasteh, Dariush K. (Oakland, CA); Hartmann, John L. (Seattle, WA)

1991-01-01T23:59:59.000Z

197

Thermal insulated glazing unit  

DOE Patents (OSTI)

An improved insulated glazing unit is provided which can attain about R5 to about R10 thermal performance at the center of the glass while having dimensions about the same as those of a conventional double glazed insulated glazing unit. An outer glazing and inner glazing are sealed to a spacer to form a gas impermeable space. One or more rigid, non-structural glazings are attached to the inside of the spacer to divide the space between the inner and outer glazings to provide insulating gaps between glazings of from about 0.20 inches to about 0.40 inches. One or more glazing surfaces facing each thermal gap are coated with a low emissivity coating. Finally, the thermal gaps are filled with a low conductance gas such as krypton gas. 2 figs.

Selkowitz, S.E.; Arasteh, D.K.; Hartmann, J.L.

1988-04-05T23:59:59.000Z

198

United States Environmental Monitoring  

Office of Legacy Management (LM)

EPA 60014-91/030 EPA 60014-91/030 Environmental Protection Systems Laboratory DOE/DP00539-063 Agency P.O. Box 93478 Las Vegas NV 891 93-3478 Research and Development Offsite Environmental Monitoring Report: 1 - 3 5 Radiation Monitorina Around * / (- P 7 1 United States ~ u c l g a r Test Areas Calendar Year 1990 This page intentionally left blank EPN60014-90 DOWDP Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1990 Contributors: D.J. Chaloud, B.B. Dicey, D.G. Easterly, C.A. Fontana, R.W. Holloway, A.A. Mullen, V.E. Niemann, W.G. Phillips, D.D. Smith, N.R. Sunderland, D.J. Thome, and Nuclear Radiation Assessment Division Prepared for: U.S. Department of Energy under Interagency Agreement Number DE-A108-86-NV10522

199

Laser system preset unit  

DOE Patents (OSTI)

An electronic circuit is provided which may be used to preset a digital display unit of a Zeeman-effect layer interferometer system which derives distance measurements by comparing a reference signal to a Doppler signal generated at the output of the interferometer laser head. The circuit presets dimensional offsets in the interferometer digital display by electronically inducing a variation in either the Doppler signal or the reference signal, depending upon the direction of the offset, to achieve the desired display preset.

Goodwin, William L. (Knoxville, TN)

1977-01-01T23:59:59.000Z

200

Hoechst plans Mexican unit  

SciTech Connect

Hoechst is considering plans to build its first ethoxylates project in Mexico, Mark Sijthoff, head of surfactants and auxiliaries for Hoechst`s specialty chemical business unit, tells CW. The company expects to make a decision on the 30,000-m.t./year project by the end of the year. Sijthoff would not disclose the site or where ethylene oxide (EO) feed would be obtained. The plan may depend on results of the privatization of Petroleos Mexicanos (Pemex), which is the only producer of EO in Mexico. Hoechst is part of a consortium bidding on the privatization. Sources say the unit will be built at Quimica Hoechst`s Coatzacoalcos site, close to Pemex`s EO plants at Cangregera and Morelos. A planned EO expansion at Morelos will probably move ahead when the sell-off is completed. Sijthoff says that Hoechst is also looking at improving its US surfactants position, although the company has no plans to expand ethoxylates, as there is {open_quotes}plenty of capacity.{close_quotes} Hoechst started up a 150-million lbs/year plant at Clear Lake, TX last year, ending a tolling agreement with Union Carbide. In addition, Rhone-Poulenc recently started a unit at Marcus Hook, PA, and Condea Vista is doubling its ethoxylation capacity at Lake Charles, LA. Meanwhile, Hoechst is still considering construction of 30,000-m.t./year ethoxylation plant in India or China. A decision is expected later this year.

Wood, A.; Alperowicz, N.

1996-05-22T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Working and Net Available Shell Storage Capacity  

U.S. Energy Information Administration (EIA) Indexed Site

Working and Net Available Shell Working and Net Available Shell Storage Capacity November 2013 With Data as of September 30, 2013 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | Working and Net Available Shell Storage Capacity as of September 30, 2013 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or

202

Mathematical structure of unit systems  

E-Print Network (OSTI)

We investigate the mathematical structure of unit systems and the relations between them. Looking over the entire set of unit systems, we can find a mathematical structure that is called preorder (or quasi-order). For some pair of unit systems, there exists a relation of preorder such that one unit system is transferable to the other unit system. The transfer (or conversion) is possible only when all of the quantities distinguishable in the latter system are always distinguishable in the former system. By utilizing this structure, we can systematically compare the representations in different unit systems. Especially, the equivalence class of unit systems (EUS) plays an important role because the representations of physical quantities and equations are of the same form in unit systems belonging to an EUS. The dimension of quantities is uniquely defined in each EUS. The EUS's form a partially ordered set. Using these mathematical structures, unit systems and EUS's are systematically classified and organized as a hierarchical tree.

Masao Kitano

2013-05-04T23:59:59.000Z

203

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

must have a valid United States passport. Personnel must also contact WIPP's Counterintelligence Information Officer (Hector Saldana) to receive briefings and debriefings when...

204

file://\\\\Bellview\\TeamWorks\\TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

Trade & Industry's Liabilities Management Unit and the forerunner, says Edwards, of the Nuclear Decommissioning Authority. His organization is responsible for preparing "the way...

205

TRU TeamWorks  

NLE Websites -- All DOE Office Websites (Extended Search)

, 2004 , 2004 By the Numbers WIPP marks five-year anniversary Shipments scheduled to arrive at WIPP for the week of 4/4/04 - 4/10/04: 18 Total shipments received at WIPP: 2,456 Total volume disposed at WIPP: 19,042 m 3 FY04 Performance Metrics D E P A R T M E N T O F E N E R G Y U N I T E D S T A T ES O F A M E R I C A TeamWorks TeamWorks TRU A weekly e-newsletter for the Waste Isolation Pilot Plant team For those who endured the early morning cold of March 26, 1999, to witness WIPP's first shipment, it may seem like yesterday. Yet Friday marked five years of WIPP operations. Relative newcomer to WIPP - but not to the waste management industry - CBFO Deputy Manager Lloyd Piper observed, "The transformation from a facility in "standby" mode to operational mode has been nothing short of amazing."

206

End of Month Working  

Gasoline and Diesel Fuel Update (EIA)

The level of gas in storage at the end of the last heating season (March The level of gas in storage at the end of the last heating season (March 31, 2000) was 1,150 billion cubic feet (Bcf), just above the 1995-1999 average of 1,139 Bcf. Underground working gas storage levels are currently about 8-9 percent below year-ago levels. In large part, this is because injection rates since April 1 have been below average. Storage injections picked up recently due to warm weather in the last half of October. The month of November is generally the last month available in the year for injections into storage. A cold November would curtail net injections into storage. If net injections continue at average levels this winter, we project that storage levels will be low all winter, reaching a level of 818 Bcf at the end of March, the lowest level since 1996

207

Work Force Restructuring Activities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Force Restructuring Activities Force Restructuring Activities December 10, 2008 Note: Current updates are in bold # Planned Site/Contractor HQ Approved Separations Status General * LM has finalized the compilation of contractor management team separation data for the end of FY07 actuals and end of FY08 and FY09 projections. LM has submitted to Congress the FY 2007 Annual Report on contractor work force restructuring activities. The report has been posted to the LM website. *LM conducted a DOE complex-wide data call to the Field and Operations offices for DOE Contractor Management teams to provide, by program, actual contractor separation data for the end of FY 2008 and projections for the end of FY 2009 and FY 2010. The data will be used to keep senior management informed of upcoming large WFR actions.

208

Statement of Work  

NLE Websites -- All DOE Office Websites (Extended Search)

DE-SOL-0003174 1 FOR OFFICIAL USE ONLY - SOURCE SELECTION SENSITIVE, SEE FAR 3.104-3 PERFORMANCE WORK STATEMENT (PWS) Emergency Operations Training Academy (EOTA) Support Services May 27, 2011 Draft 1.0 Introduction The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), Office of Emergency Operations (NA-40) requires support services in the development and delivery of training, exercises, and other related technical and administrative support services at the Emergency Operations Training Academy (EOTA) in Albuquerque, New Mexico. 2.0 Background NA-40's mission is to ensure that capabilities are in place to respond to any NNSA and DOE facility emergency. NA-40 is the nation's premier responder to any nuclear or radiological

209

TRU TeamWorks  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2012 8, 2012 WIPP Quick Facts (As of 9-26-12) 10,849 Shipments received since opening (10,252 CH and 597 RH) 83,693 Cubic meters of waste disposed (82,394 CH and 299 RH) 162,472 Containers disposed in the underground (161,882 CH and 590 RH) Photo above right: CBFO Deputy Manager Ed Ziemianski presents a WIPP team with the Green Zia Program Silver Level Award from the New Mexico Environment Department on Aug. 15, 2012 in recognition of environmental initiatives. Shown right of Ziemianski is Farok Sharif, WTS President and General Manager. New WIPP Management and Operating Contractor to start October 1 Nuclear Waste Partnership LLC (NWP) will start work as the WIPP Management and Operating Contractor on Monday, October 1. WIPP receives Green Zia Award The Waste Isolation Pilot Plant (WIPP), the U.S. Department of Energy (DOE)

210

COMMENTARY Making sustainability work  

E-Print Network (OSTI)

Today’s economic theory usually neglects the role of nature and environment. To make sustainability work it is, however, essential to (re-)integrate nature into the standard concepts of economics, especially by incorporating natural factors into the production function. It must be acknowledged that economic growth is not (only) the result of technical change but is mainly caused by rising energy-inputs into the economy, and that this is necessarily followed by resource exhaustion and pollution. Therefore, nature must not only be taken into account as a central factor of production but also in the form of environmental quality which is the basis for human quality of life. A numeric example shows that a small, but steady decrease of yearly resource consumption is already apt to redirect the economy on a path of sustainable development. © 1998 Elsevier Science B.V. All rights reserved. Keywords: Sustainable development; Economic theory of production; Economic growth; Technical change; Non-renewable resources

Hans Christoph Binswanger

1996-01-01T23:59:59.000Z

211

Working With FEERC  

NLE Websites -- All DOE Office Websites (Extended Search)

Mechanisms For Partnering Mechanisms For Partnering with the Fuels, Engines, and Emissions Research Center at the Oak Ridge National Laboratory Oak Ridge National Laboratory (ORNL) has a program designed to provide technology-based solutions to organizations ranging from startups to Fortune 100 companies to academic institutions. Underlying this philosophy is our belief that strong partnerships with U.S. industry are the best way to share technological know-how with the private sector. Regardless of the activity-entering into a Cooperative Research and Development Agreement (CRADA) or Work for Others (WFO) agreement, or interacting with an industry or university through other means-we are committed to outcomes that create beneficial opportunities for the external organization as well as

212

Links to on-line unit conversions  

Science Conference Proceedings (OSTI)

... Basic physical quantities. General unit, currency, and temperature conversion. ... Many conversions, including unusual and ancient units. ...

213

OF THE UNITED NATIONS  

E-Print Network (OSTI)

The OECD is a unique forum where the governments of 31 democracies work together to address the economic, social and environmental challenges of globalisation. The OECD is also at the forefront of efforts to understand and to help governments respond to new developments and concerns, such as corporate governance, the information economy and the challenges of an ageing population. The Organisation provides a setting where governments can compare policy experiences, seek answers to common problems, identify good practice and work to co-ordinate domestic and international policies.

unknown authors

2010-01-01T23:59:59.000Z

214

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

3 Lighting Usage Indicators by Type of Housing Unit, 2005" " Million U.S. Housing Units" ,,"Type of Housing Unit" ,"Housing Units (millions)","Single-Family Units",,"Apartments in...

215

Million U.S. Housing Units Total...............................  

U.S. Energy Information Administration (EIA) Indexed Site

Attached 2 to 4 Units Table HC2.12 Home Electronics Usage Indicators by Type of Housing Unit, 2005 5 or More Units Mobile Homes Type of Housing Unit Housing Units (millions)...

216

Current Name Academic Unit Request  

E-Print Network (OSTI)

Current Name Academic Unit Request Department/College/School/Institute/Center Names: New or Changes This form is to be used to request new academic units (departments, colleges, schools, institutes, or centers) or to request changes to existing academic units. Complete the following and submit

Hart, Gus

217

NSLS Committees | Interlock Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Interlock Working Group Charge The NSLS Interlock Working Group shall review all new construction and modification of NSLS and SDL personnel protection interlock systems. It is the...

218

Will NIF Work  

E-Print Network (OSTI)

It is vital that new clean and abundant sources of energy be developed for the sustainability of modern society. Nuclear fusion of the hydrogen isotopes deuterium and tritium, if successful, might make a major contribution toward satisfying this need. The U.S. has an important effort aimed at achieving practical inertial confinement fusion, ICF, which has been under development for decades at the Lawrence Livermore National Laboratory. The National Ignition Facility (NIF) is a giant laser to multiply-shock and thus quasi-isentropically compress a capsule of deuterium-tritium (DT) to high density and temperature, where the fusion rate is proportional to density squared times temperature to the fourth power. The principal problem that must be solved for NIF to work successfully is elimination of the Rayleigh-Tailor (R-T) instability that originates from the interface between the solid shell and the DT fuel within it. The R-T instability poisons the fusion reaction by reducing the temperature of the DT achieved ...

Nellis, W J

2009-01-01T23:59:59.000Z

219

Verti Jack Pumping Unit evaluation  

Science Conference Proceedings (OSTI)

The Verti Jack Pumping Unit was tested primarily to establish the energy comsumption efficiency of the unit as compared with that of conventional pumping unit. Before the unit was field tested, extensive static testing was performed to determine the effect of the counterbalance system throughout the operational cycle. The field test included comparing the performance of the Verti Jack Unit and conventional pump jacks - a Bethlehem 16 and Cabot 25 pumping unit. The Verti Jack unit was operated at four different pumping conditions. The Verti Jack unit peformed satisfactorily during the testing. Only minor problems that could not be attributed to the design or operation of the unit were encountered. Changing the stroke length was difficult in the field, but such operational problems were expected in operating the first phototype and can be corrected on future models. During the higher pumping rate tests of the Verti Jack unit, the well ceased to deliver fluid quantities at rates adequate to the pumping rate. These data are shown in table 8. Therefore, evaluation data are based on theoretical pump performance and are presented in table 9. The data show that the Verti Jack is more efficient than the conventional units tested. The most direct comparison was the Verti Jack test at 36-inch stroke and 12 1/2 strokes per minute versus the Cabot unit at 37-inch stroke and 12 strokes per minute. In the comparison the Verti Jack operated about 24 percent more efficiently than the Cabot unit. Comparing the summation of all Verti Jack tests with that of all conventional unit tests, the Verti Jack operated about 15 percent more efficiently. Compared to the Cabot unit only, the Verti Jack was about 17 percent more energy efficient. 13 figs., 12 tabs.

Porter, R.; Spence, K.

1985-11-01T23:59:59.000Z

220

United States Government Memorandum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy United States Government Memorandum DATE: March 21, 2008 Audit Report Number: OAS-L-08-08 REPLY TO ATTN OF: IG-321 (A07LV042) SUBJECT: Audit Report on "Accountability of Sensitive and High Risk Property at the Nevada Site Office" TO: Acting Manager, Nevada Site Office INTRODUCTION AND OBJECTIVE and control over sensitive and high risk property because of the vulnerability to loss, theft or misuse and its potential impact on national security interests or proliferation concerns. Items such as portable and desktop computers, ammunition. and firearms are examples of sensitive property. In addition, federal regulations require that Departmental organizations and designated contractors account for and control govemroent-owned high risk property, such as body armor and gas masks,

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

222

United States Government  

Office of Legacy Management (LM)

D;il$;,8 p! A . I I& - ' D;il$;,8 p! A . I I& - ' z United States Government &mtrne&' of Energy DATE: &uG 3, 9 394 REPLY TO AITN OF: EH-421 (W. A. Williams, 427-1719) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of Mr. Doug Toukay and Ms. Michelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recommdations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites and to ratify and confirm the

223

Unite2 States Government  

Office of Legacy Management (LM)

+39J +39J t% (3740~ - Unite2 States Government m e m o randuin L3 DATE: AU6 3, 9 %g4 REPLY TO All-N OF: m -421 (U. A. W illiams, 427-1719) -. - >' SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of Hr. Doug Toukay and Ms. M ichelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recouwndations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites and to ratify and confirm the

224

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

/18/04 THU 11:31 FAX 423 241 3897 OIG -- /18/04 THU 11:31 FAX 423 241 3897 OIG -- + HQ 1002 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: March 17, 2004 Audit Report No. OAS-L-04-1 1 REPLY TO IG-36 (A04DN003) ATTN OF: SUBJECT; Audit of "Requests for Equitable Adjustment at the Rocky Flats Environmental Technology Site" TO: Frazer R. Lockhart, Manager, Rocky Flats Project Office INTRODUCTION AND OBJECTIVE Effective February 1, 2000, the Department of Energy's (Department) Rocky Flats Project Office (RFPO) and Kaiser-Hill Co., LLC (Kaiser-Hill), entered into a cost- plus-incentive-fee contract to close the Rocky Flats Environmental Technology Site (Rocky Flats) by December 15, 2006. Under the contract terms, Kaiser-Hlill's final incentive fee earned will be based on how well it meets established cost targets. For

225

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . . .... ...... ..... .. . .. . . .. . , . . . . ..- - --. -- -. , . . DOEF 1325,8 (08.93) United States Government Department of Energy memorandum DATE: August 13, 2007 1 Audit Report Number: OAS-L-07-21 REPLY TO ATTN OF: IG-32 (A06PR047) SUBJECT: Audit of Executive Compensation at Selected National Nuclear Security Administration Sites TO: Director, Policy and Internal Controls Management, NA-66 INTRODUCTION AND OBJECTIVE As part of a Department of Energy-wide audit of executive compensation, we reviewed fourN* Lti nai-.AL 4 ... :.. ,._*i Amiinistration (NiNSA)SsitCe. Speuiiiu-~l we reviewed executive cormpeisation costs incurred and claimed for Fiscal Years 2003, 2004, and 2005 at Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratory (LLNL), Sandia National Laboratories, and the Y-12

226

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 DOE F 1325.8 (08-93) United States Government Department of Energy memorandum DATE: April 23, 2004 Audit Report Number: OAS-L-04-16 REPLY TO ATTN OF: IG-35 (A04YT023) SUBJECT: Audit Report on "Modernization Activities at the Y-12 National Security Complex" TO: Richard Speidel, Director, Policy and Internal Controls Management, NA-66 INTRODUCTION AND OBJECTIVE As part of the National Nuclear Security Administration's (NNSA) nuclear weapons complex, the Y-12 National Security Complex (Y-12) performs critical roles in strengthening national security and reducing the global threat from weapons of mass destruction. The Y-12 modernization plan (plan) seeks to foster the development of a physical plant that is efficient and effective in serving its national security missions. The

227

. United States Government  

Office of Legacy Management (LM)

,:n5.5.8 ,:n5.5.8 ,849, EfG pw, . United States Government DATE: AUG 2 i994 y#J;; EM-421 (W. A. Williams, 427-1719) sUBJECT: -Elimination of the Robbins & Myers Site, Springfield, Ohio 11179 I The File TO: I have reviewed the attached elimination recommendation and the original historical records for the Myers & Robbins facility in Springfield, Ohio. I have determined that there is little likelihood of radioactive contamination at these sites. The only record of activity at this site by Department of Energy predecessors is an equipment test of a pump in March 1975. This test involved limited amounts of radioactive materials and there was a serious effort to decontaminate the equipment at the conclusion of the tests. Based on the above, the Myers & Robbins site in Springfield, Ohio, is

228

United States Government  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 E&M&& +\A .wz United States Government Department of Energy DATE: RUG 3, 9 %g4 y;;;; EM-421 (W. A. W illiaas, 427-1719) "; :+ 1 SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of M r. Doug Tohkay and Ms. M ichelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recomendations were made to eliminate then from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites and to ratify and confirm the

229

Uniter+ States Government  

Office of Legacy Management (LM)

EFG (07-90) EFG (07-90) Uniter+ States Government ~L.aQ-i; Department of Energy inemorandum DATE: SEP 2 5 1992 REPLY TO Al-fN OF: EM-421 (W. A. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Dow Chemical Company Facility in M a d ison, Illinois TO: L. Price, OR The site of the Former Dow Chemical Company in M a d ison, Illinois, which is currently owned and operated by the Spectrulite Consortium, is designated for inclusion in the Formerly Utilized Sites Remedial Action Program (FUSRAP). This designation is based upon the results of a preliminary radiological survey and other information described in the attached Designation Summary. The authority determination and preliminary survey report also are attached for information. The site has been assigned a low priority under the FUSRAP protocol, as

230

United States Government  

Office of Legacy Management (LM)

# Xx i' # Xx i' !325 8 I c&egJw, i&l d, 4 -1 United States Government Department of Energy DATE; AUG 3, 9 !gg4 I REPLYTo m-421 (W. A. Williams, 427-1719) sy I AlTN OF: SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of Mr. Doug Tonkay and Ms. Nichelle Landis, I reviewed a number of sites that had formerly provided goods a&/or services to the Fernald facility as subcontractors. For 24 of these sites, recoumendations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

231

United States Government  

Office of Legacy Management (LM)

EFS (07-W EFS (07-W United States Government memorandukn Department of Energy j ; I.-- ' -i;: /J DATE: j.gjG 2 9 1994 REPLY TO En-421 (W. A. Williams, 427-1719) AlTN OF: h p)\;--/ ;,;' J ( SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of Ur. Doug Tonkay and Us. Michelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recoPraendations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

232

United States Government Memorandum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8/16/07 09:15 FAX 301 903 4656 CAPITAL REGION 8/16/07 09:15 FAX 301 903 4656 CAPITAL REGION * 002 DOE F 1325.8 (08-93) Department of Energy United States Government Memorandum DATE: August 15, 2007 Audit Report Number: OAS-L-07-22 REPLY TO ATTN OF: IG-34 (A06GT006) SUBJECT: Report on "Hazardous Chemicals Inventory Management at the Savannah River Site" TO: Manager, Savannah River Operations Office BACKGROUND The Savannah River Site (Savannah River) maintains large inventories of hazardous chemicals for its scientific, environmental cleanup and production operations. Many of these chemicals are known carcinogens; some are corrosive, while others are highly flammable. As such, these chemicals can pose serious health and safety risks to workers and members of the public, the environment, and to emergency first responders if not properly managed and controlled.

233

,. United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

i. 001 i. 001 DOE F 1325.8 (8-89) EFG (07-90) ,. United States Government Department of Energy memorandum DATE: September 11, 2003 REPLYTO: IG-34 (A03NE045) Audit Report No.: OAS-L-03-20 SUBJECT: Audit of Procurement Administration at the Oak Ridge National Laboratory TO: Director, Office of Management, Budget and Evaluation/Chief Financial Officer, ME-1 The purpose of this report is to inform you of the results of our survey of procurement administration at the Oak Ridge National Laboratory (Laboratory). This review was initiated in May 2003 and fieldwork was conducted through August 2003. Our review methodology is described in an attachment to this report. INTRODUCTION AND OBJECTIVE In Fiscal Year (FY) 2002, the Department of Energy's (Department) management contractors procured approximately $6.4 billion worth of goods and services from

234

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31/07 THU 18:20 FAX 865 241 3897 OIG --- HQ 31/07 THU 18:20 FAX 865 241 3897 OIG --- HQ 00 DOE F 1325.8 (08&93) United States Government Department of Energy memorandum DATE: May 31, 2007 Audit Report Number: OAS-L-07-13 REPLY TO ATTN OF: IG-32 (A07RL048) SUBJECT: Audit of Safety Allegations Related to the Waste Treatment Plant at the Hanford Site TO: Manager, Office of River Protection INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Hanford Site is responsible for treating and preparing 53 million gallons of radioactive and chemically hazardous waste for disposal. Bechtel National, Inc. (Bechtel) is designing, building and commissioning the Waste Treatment Plant (Plant), a category II nuclear facility, which is comprised of a complex of treatment facilities to vitrify and immobilize radioactive waste into a

235

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OEF 1325.8 OEF 1325.8 (U8-93) United States Government Department of Energy memorandum DATE: April 11, 2007 Audit Report Number: OAS-L-07-I1 REPLY TO ATTN OF: IG-32 (A07DN056) SUSJECT: Audit of the Department of Energy's Community and Regulatory Support Funding at the Richland Operations Office TO: Manager, Richland Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Office of Environmental Management provided $60.1 million in Community and Regulatory Support funding in Fiscal Year (FY) 2005 to a number of Departm- nt sites. The funding is intended to be used for activities indirectly related to nuclear and hazardous waste cleanup, such as agreements with state regulatory agencies and transportation departments. During FY 2005, the Department's Richland

236

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a . a . r-z . "*& ., . .. uoi UA o. --.- flI gj UUX DOE F 1325.8 (08.93) United States Government Department of Ene memorandum DATE: August 19, 2004 Audit Report Number: OAS-L-04-18 REPLY TO ATTN OF: IG-36 (A03IF009) SUBJECT: Audit of the "Revised Pit 9 Cleanup Project at the Idaho National Engineering and Environmental Laboratory" TO: Paul Golan, Acting Assistant Secretary, Office of Environmental Management INTRODUCTION AND OBJECTIVE The Idaho National Engineering and Environmental Laboratory's (iNEEL) subsurface disposal area was established in 1952 for disposal of solid radioactive waste and now encompasses an area of approximately 88 acres. Wastes from the INEEL and other Department of Energy (Department) sites, rmost notably Rocky Flats, were buried in

237

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

vu & . vu & . ,I / v a L U ; .8 " ',X v &..'*. "o uu V"x Ijo tf J ,*- , , i 4 w i tiJ U U 1 OEF S.a 135 (0B93) United States Government - Department of Energy memorandum DATE: February 27, 2007 REPLY TO Audit Repor Number: OAS-L-07-08 ATTN OF: IG-32 (A06ID015) SUBJECT: Audit of the "Design of the Engineered Barrier System at the Yucca Mountain Site" TO: Principal Deputy Director, Office of Civilian Radioactive Waste Management INTRODUCTION AND OBJECTrVE In accordance with the Nuclear Waste Policy Act of 1982, the Department of Energy's (Department) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for designing, licensing, constructing, and operating a repository, known as Yucca Mountain, for the permanent disposal of spent nuclear fuel and high-level -

238

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

F 1325.8 F 1325.8 (08-93) United States Government Department of Energy memorandum DATE: August 13, 2007 . . Audit Report Number: OAS-L-07-18 REPLY TO ATTN OF: IG-32 (A07PR061) SUBJECT: Audit of Executive Compensation at Brookhaven National Laboratory TO: Manager, Brookhaven Site Office INTRODUCTION AND OBJECTIVE As part of a Department of Energy-wide audit of executive compensation, we reviewed executive compensation at the Office of Science's Brookhaven National La --- _ .r . . tc. av .... n . Ou audit covered executive cuupoci'A ;is in curred and claimed for Fiscal Years 2003, 2004, and 2005. Brookhaven Science Associates, LLC, operated Brookhaven under Department of Energy (Department) contract number DE-AC02-98CH10886. The amount of executive compensation that can be reimbursed to Department

239

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

')/06 MON 14:28 FAX 423 241 3897 OIG ')/06 MON 14:28 FAX 423 241 3897 OIG --- HQ 1o001 ,O " F 1325.8 (08-93) United States Government Department of Energy memorandum DATE: April 10, 2006 Audit Report No.: OAS-L-06-11 REPLY TO ATTN OF: IG-32 (A05ID043) SUBJECT: Audit of "Contract Transition Activities at the Idaho Operations Office" TO: Manager, Idaho Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy's Idaho Operations Office has ongoing missions focused primarily in the areas of nuclear energy and environmental cleanup. From October 1, 1999 to February 1, 2005, Bechtel BWXT Idaho, LLC (Bechtel) managed facility operations for both of these missions. In Fiscal Year 2005, two separate contracts began in order to add focus and clarity to each respective mission. First, the Idaho National

240

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-93) -93) United States Government Department of Energy memorandum DATE: July 12, 2007 Audit Report Number: OAS-L-07-15 REPLY TO ATnN OF: IG-32 (A07ID055) SUBJECr: Audit of the Idaho National Laboratory Facility Footprint Reduction TO: Manager, Idaho Operations Office INTRODUCTION AND OBJECTTVE On February 1, 2005, Battelle Energy Alliance, LLC (BEA) assumed responsibility for managing and operating the Idaho National Laboratory (INL) for the Department of Energy (Department) under a new 10 year contract. ThI m.ion for ,the L s to nntance the Nation's energy security by becoming the preeminent, internationally recognized nuclear energy research, development, and demonstration laboratory.. To accomplish this mission, BEA proposed aggressive infrastructure initiatives

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

United States Government Departmen  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7/05 TUE 07:58 FAX 423 241 3897 OIG -** HQ @]002 7/05 TUE 07:58 FAX 423 241 3897 OIG -** HQ @]002 DOE F 1325.8 (08-93) United States Government Departmen of Energy memorandum DATE: December 20, 2005 Audit Report Number: OAS-L-06-03 REPLY TO A1TN OF; IG-36 (A05SR025) SUBJECT: Audit of "Defense Waste Processing Facility Operations at the Savannah River Site" TO: Jeffrey M. Allison, Manager, Savannah River Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Savannah River Site stores approximately 36 million gallons of liquid, high-level radioactive waste in 49 underground waste storage tanks. The contents of the waste tanks are broadly characterized as either "sludge waste" or "salt waste". Sludge waste is insoluble and settles to the bottom of a waste tank, beneath a layer of liquid supernate. Salt

242

* United States Government  

Office of Legacy Management (LM)

-- -- DE;$r,e /q f-j * I3 - I * United States Government memorandum MAY 21 I991 DATE: REPLY TO Al-fN OF: 4ih55YhL Department of Energy JT:,i 5, f&A 0 ' - j4.~, ' -/ jl.a' \ A t -3 __..-_-. EM-421 SUBJECT: Elimination of the American Potash and Chemical Site The File TO: I have reviewed the attached site summary and elimination recommendation for the American Potash and Chemical Company Site in West Hanover, Massachusetts. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the American Potash and Chemical Company site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Alexander Williams, PhD Designation and Certification Manager

243

United States Goveinment  

Office of Legacy Management (LM)

,325.B ,325.B jO8.93) United States Goveinment ~~~rntir-andu~rvi Depr?rtnient of Energy \L, IO' " 1' !ATE:' MAY i o 1995 ,' Kzb9. ":cz$ EM-421 (W.,A. Williams, 301-903-8149) SUBJECT: Records for the West Chicago Site .The File TO: After review.of the available r&rds concerning the former 'Lindsay Light and Chemical.Corhpany site in West Chicago, Illinois. I have determined that it is not necessary to transmit Department of Energy (DOE) records to the municipa,llty to inform public officials of the activities at this ~ site. This site has been licgnsed by the Nuclear Regulatory Commission (NRC) for many.years, and the nature of the. rare'earth and thorium production at the site, are well known. Remediation of this faci'lity ii~ being addressed by the current owner, 'the NRC, the U.S; Environmental

244

; United States Government  

Office of Legacy Management (LM)

Don F 1328.8 Don F 1328.8 . . .449J ' Em wm ; United States Government , % - memorandum L c*m Al.)G 2 9 a34 yz;; EM-421 (If. A. Willlams, 427-1719) lq,iMAL Department of Energy m5 MA, \i& SUBJECT: Elimination of the Sites from the Formerly Utllized Sites Remedial A&Ion Prograa ' a The File In 1990, with the assistance of Hr. Doug Tonkay and Ms. Htchelle L&is, I reviewed a number of sites that had fomerly provided goods and/or services to the Fernald faclllty as subcontractors. For 24 of.these sites, recoarwndations were ude to eliainate thm from further consideratton under Formerly Utilized Sites Reaedial Actlon Progrm (FUSRAP). In each case, I made or revlewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

245

UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

'.... '|le , * f C. '.... '|le , * f C. Office Memorandum · UNITED STATES GOVERNMENT .-- J TO ' Leo Graup, Chief, DATE: September 29, 1958 Property Management Branch rFi0 : M. S. Weinstein Industrial Hygiene Branch, HASL SUBJBT: SURVEY AT HAIST PROPETIY SYMBOL: HSH:MSW. Thisl property was purchased during MED operation and used as a dumping ground for refinery residues generated by Linde Air Products during their period of participation in the refinery operations program. \It 2 consists of 10 acres in addition to a perpetual .ease- ment right to a strip of land, 10 feet wide and 3600 feet long. The area is located in North Tonawanda, New York near the Niagara River. Because of the growth of adjacent industries, this particular piece of property has appreciated in value. During its tenure as responsible property management office, Oak

246

United States Government  

Office of Legacy Management (LM)

OOE F 1325.8 OOE F 1325.8 - EFgzk3) United States Government tiemorandum 0 wt;? -J Department of Energy DATE: SEP 2 5 1992 REPLY TO Al-TN OF: EM-421 (W. A. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at Diamond Magnesium Site in Painesville, Ohio TO: L. Price, OR The former Diamond Magnesium Company site located at 720 Fairport-Nursery Road in Painesville, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The site is owned by Uniroyal Chemical Company and by Lonza Chemical, Incorporated. This designation is based on the results of a radiological survey and conclusions from an authority review as noted in the attached Designation Summary. Copies of the radiological survey reports and the authority

247

United States Government  

Office of Legacy Management (LM)

Z&Et,? y-p . c' Z&Et,? y-p . c' )7q/ I cuq,~ United States Government Department of Energy memoranduin I " . : I ;/ ,I DATE: hufi 2 9 1594 \ ' - y:oTFq M-421 (W. A. Ylllius, 427-1719) ' ii Y - SIJWECT: Elimination of the Sites from the Formerly Utilfzed Sites Remedial Actjon Progru TO The File In 1990, with the assistance of Mr. reviewed a number of sites that had services to the Fernald facility as sites, recommendations were made to ___ _- _ consideration under Formerly Utiltzed Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites and to ratify and confirm the prior elimination of each site froa FUSRAP.

248

United States Government  

Office of Legacy Management (LM)

DOE F t325.8 DOE F t325.8 (s8s) Dl? l 36-z EFG (07-90) United States Government m e m o randum Department of Energy DATE: LUG 2 ' 3 1394 ",cl,'," EM-421 (W. A. W illiams, 427-1719) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of M r. Doug Tonkay and Ms. M ichelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of these sites, recoamnendations were aade to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

249

- United States Government  

Office of Legacy Management (LM)

8 8 my EFG (07.90) . - United States Government . * Department of. Energy * inemorandum DATE: DEC :! ;j 1993 REPLY TO ATTN OF: EM-421 (W.'A. W illiams, 903-8149) : NY 41 I .' 41 G I? SUBJECT: Elimination of the T itanium Alloy Manufacturing Co., Niagara Falls, New York TO: The F ile I have reviewed the attached site. summary and elimination recommendation for the T itanium Alloy Manufacturing Company. I have determined that the potential for radiological contamination is low because of the lim ited duration of the activities at the site. Further, at least some of the contractual activities at the site were licensed under the Atomic Energy Act, and the licensed activities are thereby disqualified from further consideration under the Department of Energy's Formerly Utilized Sites

250

United States Government  

Office of Legacy Management (LM)

UOEF 1325.8 UOEF 1325.8 (5831 , - a.. L . . L. . c ,, . . . t ,' <, .* -,. .--1^ a "-2 (J 7 , pe-;L, United States Government memorandum Departmen: of Energy DATEAUG 1 0 1984 REPLY TO Al-fN OF: NE-20 SUBJECT: Action Description Memorandum (ADM) Review: Wayne, New Jersey Proposed 1984 Remedial Actions at TO: File After reviewing all of the pertinent facts including the attached Action Description Memorandum (ADM), I have determined that the remedial action described in the subject ADM is an action which in and of itself will have a clearly insignificant impact on the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA), 42 U.S.C. 4321 et seq. The Conference Report accompanying the Energy and Water Appropriation Act

251

United States Government  

Office of Legacy Management (LM)

I8 891 I8 891 EFG (07.90) United States Government m e m o randum bepartrne% of Energy -P ' ; N. A *I Pi id : DATE: AUG 3, 9 1994 REPLY TO Al-iN OF: EM-421 (W. A. W illiams, 427-1719) r, )' \, ! c ' d, ' t ' 3 ' 2 -L SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of M r. Doug Tonlsay and Ms. M ichelle Landis, I reviewed a nmber of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recommdations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

252

United States Government  

Office of Legacy Management (LM)

81278 81278 United States Government Department of Energy memorandum - ?71 S.EP 23 F; i: 54 DATE: SEP 1 8 1991 REPLY TO ATTNOF: EM-421 (P. Blom, 3-8148) SUBJECT: Approved Categorical Exclusion for Removal Actions at Elza Gate, Tennessee TO: Lester K. Price, OR Attached is a copy of the approved Categorical Exclusion (CX) for removal of contaminated material at the Elza Gate site in Tennessee. The removal action involves the removal of radioactive contaminated soil and concrete as well as the removal of Polychlorinated Biphenyl (PCB) contaminated soil. This CX was approved by Carol Borgstrom, Office of National Environmental Policy Act Oversight (EH-25), September 9, 1991. Paul F. Blom Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration

253

United States Government  

Office of Legacy Management (LM)

DOEF1325.8 P4 0 * 1 - 1 DOEF1325.8 P4 0 * 1 - 1 - Iq \ b- United States Government memorandum pJ .T\ \b Department of Energy DATE: OCT 9 1984 REPLY TO NE-20 All-N OF: .- Authorizations for Actions Under the Formerly Utilized Sites Remedial Action SUBJECT: Program (FUSRAP) at the St. Louis Airport Storage Site, St. Louis, MO. and the W. R. Grace Site at Curtis Bay, Md. To: J. LaGrone, Manager Oak Ridge Operations Office St. Louis Airport Storage Site, MO The House and Senate Reports for the Energy and Water Development Appropriation Act (P.L. 98-360) directed the Department of Energy "...to take the necessary steps to consolidate and dispose of the waste material from the Latty Avenue site and nearby St. Louis Airport vicinity properties locally, by reacquiring, stabilizing, and using the old 21.7

254

United States Government  

Office of Legacy Management (LM)

ooc F r325.8 ooc F r325.8 imo, EFO ,ww United States Government memorandum Department of Energy -fw?w 81ua DATE: FEB 1 5 1991 l+Ks6 sUsJECT: Elimination of the Buflovak Company Site from FUSRAP ho: The File I have reiiewed the attached preliminary site summary and recommendation for the Buflovak Company site in Buffalo, New York. I have determined that there is little likelihood of contamination at this site. Based on the above, the Buflovak Company site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Alexander Williams Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment - I . b e e : W e s to n E M - 4 0 ( 3 ) E M - 4 2 ( 2 ) W illiams r

255

United States Attorney General  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93, 5 U.S. Op. Off. Legal Counsel 1, 1981 WL 30865 (U.S.A.G.) 93, 5 U.S. Op. Off. Legal Counsel 1, 1981 WL 30865 (U.S.A.G.) United States Attorney General ***1 *293 January 16, 1981 **1 The President The White House Washington, D.C. 20500 MY DEAR MR. PRESIDENT: You have asked my opinion concerning the scope of currently existing legal and constitutional authorities for the continuance of government functions during a temporary lapse in appropriations, such as the Government sustained on October 1, 1980. As you know, some initial determination concerning the extent of these authorities had to be made in the waning hours of the last fiscal year in order to avoid extreme administrative confusion that might have arisen from Congress' failure timely to enact 11 of the 13 anticipated regular appropriations bills, FN;B1[FN1]FN;F1 or a

256

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3/02 TUE 08:59 FAX 423 241 3897 OIG *-* HQ 00o2 3/02 TUE 08:59 FAX 423 241 3897 OIG *-* HQ 00o2 DOE F 132,.8 W.I: ((07.9u) United States Government Department of Energy Memorandum DATE: December 2, 2002 REPLY TO REPLY TO -36 (A02SR013) Audit Report No.: OAS-L-03-07 ATTN OF: SUBJECT: Audit of Subcontracting Practices at the Savannah River Site TO: Jeffrey M. Allison, Acting Manager, Savannah River Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy (Department) has contracted with Westinghouse Savannah River Company, LLC (Westinghouse) to manage and operate the Savannah River Site (Savannah River) through September 30, 2006. As of August 2, 2002, Westinghouse had 534 open and active service procurements worth $100,000 or more each, with a total value of about $518 million, that it had awarded since October 1996.

257

United States Goverment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6/03 15:37 FAX 301 903 4656 _ CAPITAL REGION * FORS FIVEA 91002/004 6/03 15:37 FAX 301 903 4656 _ CAPITAL REGION * FORS FIVEA 91002/004 DOE-F 1325.8 (68-93) Depament of Energy United States Goverment Department of Energy Memorandum OFFICE OF .NSPECTOR GENERAL DATE: February 26, 2003 REPLY TO ATTN OF: IG-34 (A02CG004) Audit Report No.: OAS-L-03-11 SUBJECT: Audit of the Office of Science Infrastructure Modernization Initiatives TO: Acting Associate Director, Office of Laboratory Operations and Environment, Safety and Health, SC-80 The purpose of this report is to inform you of the results of our audit of the Office of Science's infrastructure modernization initiatives. The audit was performed between May and September 2002 at Departmental Headquarters, Brookhaven National Laboratory, and Argonne National Laboratory. The audit methodology is described in

258

United States Government  

Office of Legacy Management (LM)

. v-w. . v-w. ' ;H; (07.901 United States Government 0' ; Td 2, <.<~ Department of Energy ' m e m o randum DATE: REPLY TO Al-TN OF: EM-421 (W. A. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at Alba Craft Laboratory in Oxford, Ohio L. Price, OR TO: The former Alba Craft Laboratory site at lo-14 West Rose Avenue, Oxford, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Dr. and M rs. Gilbert Pacey, of Oxford, Ohio, own the site. This designation is based on the results of a radiological survey and conclusions from an authority review as noted in the attached Designation Summary. Copies of the radiological survey letter report and the authority review are provided for your information.

259

UNITED STATES GOVERKMENT  

Office of Legacy Management (LM)

Ojice Memornndz~nz 0 Ojice Memornndz~nz 0 UNITED STATES GOVERKMENT By application dated ;!ay 11, 1959, as a~zen:ii:d Hay 25, 1959, the a--T+- I-r-- cant requests that its license SW-33 be amend,ed to authorizt? proced- ures for t>e CCLl-ect conversion of LT6 to '3$ and by applicaticn datzci June 29, 1959, a.3 n:odifizd July 15, 1059, the shipment of uranium rdioxide pellets. Based on our rexiew of the information finished by the applicant, it is hereby determined that the applicant is qualified, by training and experience, to use special nuclear material for the pwpose requested and that the ap@icant's procedures, facilities and equip- ment are adequate to protect health and minimize danger to life and property. It is, therefore, determined that ~NM-33 may be amended to

260

United States Government  

Office of Legacy Management (LM)

ocy F 1325.8 ocy F 1325.8 rcro1 . 6Fo0?-001 w 2 3-q United States Government Department of Energ) ~mc DATE: AUG 3,9 1994 y$Jf EH-421 (W. A. Yllliams, 427-1719) MA. \tQ SUBJECT: _ Elirinrtion of the Sites froa the Formerly Utilized Sites Remedial Action Program TQ The File In 1990, with the assistance of Hr. Doug Tonkay and Hr. Nlchelle Landis, I reviewed a number of sites that had fomerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recomendations were made to eliminate them from further consideration under Forwrly Utilized Sites Remedial A&Ion Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites l hd to ratify and confim the

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE:F 1325.8 7 DOE:F 1325.8 7 (08-93) United States Government Department of Energy memorandum DATE: April 10, 2006 REPLY TO ATTN OF: IG-32 (A05AL045) Audit Report Number: OAS-L-06-12 SUBJECT: Audit of Sandia National Laboratories' Safeguards and Security Path Forward Management Plan TO: Associate Administrator for Defense Nuclear Security INTRODUCTION AND OBJECTIVE From 2001 to 2003, approximately 500 security-related findings and observations were identified at Sandia National Laboratories (Sandia) by the Department of Energy's Office of Independent Oversight and Performance Assurance (OA), the National Nuclear Security Administration's (NNSA) Sandia Site Office (SSO), and Sandia's self assessments. Sandia senior management acknowledged the significance of the numerous findings and, in

262

United States Government Memorandum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy United States Government Memorandum DATE: January 26, 2007 Audit Report Number: OAS-L-07-05 REPLY TO ATTN OF: IG-34 (A06GT035) SUBJECT: Report on "The Department of Energy's Implementation of Revised OMB Circular No. A-123" TO: Acting Chief Financial Officer, CF-1 INTRODUCTION AND OBJECTIVE The Office of Management arid Budget's (OMB) revised Circular No. A-123 (Circular) requires Federal agencies to assess the adequacy of their internal controls. Beginning in Fiscal Year (FY) 2006, the Circular requires agencies to strengthen their assessment, documentation and testing of internal controls over financial reporting and prepare an annual assurance statement on the operating effectiveness of those controls. In August 2005, the Department of Energy's

263

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

w w f.b wr w f k--w .^^- - w w f.b wr w f k--w .^^- - - r - T- - * -* p -ldt - f f - - -J -vv- A n JV DOE F 1325.8 (08-93) United States Government ------- Department of Energy memorandum DATE: June 15, 2006 REPLY TO Audit Report Number: OAS-L-06-15 ATTN OF: IG-32 (A05SR029) SUBJECT Audit of "Storage Capacity of the Iligh Level Waste Tanks at the Savannah River TO: Manager, Savannah River Operations Office INTRODUCTION AND OBJECTIVE The Savannah River Site in South Carolina currently stores about 36 million gallons of waste in 49 active underground storag,* .ks. Twenty-two of these .anks do not meet Environmcntal Protection A&-.y (EPA) requirements ybr full secondary containment and must be emptied and closed by 2022 in accordance with a closure schedule approved by the EPA and the 5oith Carolina Department

264

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0/02 WED 09:58 FAX 423 241 3897 OIG 0/02 WED 09:58 FAX 423 241 3897 OIG -.- +-+ HQ ]002 rFG (07-;1) United States Government Department of Energy Memorandum DATE: October 29, 2002 REPLY TO 1G-36 (A02DN028) Audit Report No.: OAS-L-03-01 ATTN OF; SUBJECT: Audit of Procurement at the Rocky Flats Environmental Technology Site TO: Eugene Schmitt, Manager, Rocky Flats Field Office ' INTRODUCTION AND OBJECTIVE The Department of Energy (Department) and its site contractor, Kaiser-Hill Company, LLC (Kaiser-Hill), contracted in January 2000 to close the Rocky Flats Environmental Technology Site (Rocky Flats) by a target date of December'15, 2006. As of May 2002, Kaiser-Hill had awarded 784 procurements worth more than $25,000 each, with a total value of about $368.6 million, to support the complex activities required for site closure.

265

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

uV,./ J.r./ i L .. * i. uV,./ J.r./ i L .. * i. 0 r '± J o ,. NL . Jurt -. rur.mO rI[ V Jg, ]VJUU"/UU4 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum OFFICE OF INSPECTOR GENERAL DATE: January 10, 2006 REPLY TO ATTN OF: IG-34 (A06GT029) Audit Report No.: OAS-L-06-06 SUBJECT: Review of the Independent Auditor's Report on The Institute for Genomic Research for the Year Ending December 31, 2004 * TO: Manager, Chicago Office INTRODUCTION AND OBJECTIVE The Institute for Genomic Research (Institute) in Rockville, Maryland is a not-for- profit center that studies areas such as plant, microbial and mammalian genomics. The Institute receives funding from seven Federal agencies to advance its research and development. As required by the Office of Management and Budget (0MB)

266

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

memorandum memorandum DATE: April 9, 2004 Audit Report Number: OAS-L-04-13 REPLY TO ATTN OF: IG-35 (A04DC009) SUBJECT: Audit Report on "Reimbursable Work for the Department of Homeland Security" TO: Administrator, National Nuclear Security Administration, NA-1 INTRODUCTION AND OBJECTIVE The Homeland Security Act of 2002 authorizes the Department of Homeland Security (Homeland Security) to utilize the capabilities of the Department of Energy's (Department) laboratories and other sites to carry out Homeland Security's missions. The Act further provides that the Department may accept and perform work for Homeland Security on an equal basis with other Departmental laboratory and/or site missions and that Homeland Security will reimburse the Department in an amount comparable to

267

Public works for water and power development and energy research appropriations for Fiscal Year 1977. Part 7 (Pages 5561-6637). Nondepartmental witnesses. Hearings before the Committee on Appropriations, United States Senate, Ninety-Fourth Congress, Second Session on H. R. 14236  

SciTech Connect

H.R. 14236 is an act making appropriations for public works for water and power development and energy research, including the Corps of Civil Engineers, the Bureau of Reclamation, power agencies of the Department of the Interior, the Appalachian Regional Development Programs, the Federal Power Commission, the Tennessee Valley Authority, the Nuclear Regulatory Commission, the Energy Research and Development Administration, and related independent agencies and commissions for the fiscal year ending September 30, 1977. Hearings were conducted on April 1, 1976 with Senator John C. Stennis presiding, and on April 5, 1976 with Senator Milton R. Young presiding. At the hearings, after opening remarks were made by members of the U.S. Senate, nondepartmental witnesses were heard. Witnesses presenting statements, communications received, and prepared statements submitted at this series of hearings on this subject totaled approximately 1000. The listing concludes this publication. (MCW)

1976-01-01T23:59:59.000Z

268

Public works for water and power development and energy research appropriations for Fiscal Year 1977. Part 6 (Pages 4597-5559). Nondepartmental witnesses. Hearings before the Committee on Appropriations, United States Senate, Ninety-Fourth Congress, Second Session on H. R. 14236  

SciTech Connect

H.R. 14236 is an act making appropriations for public works for water and power development and energy research, including the Corps of Civil Engineers, the Bureau of Reclamation, power agencies of the Department of the Interior, the Appalachian Regional Development Programs, the Federal Power Commission, the Energy Research and Development Administration, and related independent agencies and commissions for the fiscal year ending September 30, 1977. Hearings were conducted on March 29, 30, and 31, 1976, with Senators Henry Bellmon, Birch Bayh, and Lawton Chiles presiding, respectively. At the hearings, after opening remarks were made by members of the U.S. Senate, nondepartmental witnesses were heard. Witnesses presenting statements, communications received, and prepared statements submitted for this series of hearings on this subject totaled approximately 1000. The list is presented. (MCW)

1976-01-01T23:59:59.000Z

269

Public works for water and power development and energy research appropriations for Fiscal Year 1977. Part 8 (Pages 6639-7316). Nondepartmental witnesses. Hearings before the Committee on Appropriations, United States Senate, Ninety-Fourth Congress, Second Session on H. R. 14236  

SciTech Connect

H.R. 14236 is an act making appropriations for public works for water and power development and energy research, including the Corps of Civil Engineers, the Bureau of Reclamation, power agencies of the Department of the Interior, the Appalachian Regional Development Programs, the Federal Power Commission, the Energy Research and Development Administration, and related independent agencies and commissions for the fiscal year ending September 30, 1977. Hearings were conducted on April 6, 1976, and April 7, 1976, with Senators J. Bennett Johnston and John C. Stennis presiding, respectively. At the hearings, after opening remarks were made by members of the U.S. Senate, nondepartmental witnesses were heard. Witnesses presenting statements, communications received, and prepared statements submitted at this series of hearings on this subject totaled approximately 1000. The listing concludes this publication. (MCW)

1976-01-01T23:59:59.000Z

270

ARM - Engineering Work Request & Engineering Work Order Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Request & Engineering Work Request & Engineering Work Order Guidelines Page Contents: Introduction Discussion of the ARM Climate Research Facility Engineering Process: The Engineering Change Request (ECR) and the Engineering Change Order (ECO) Operations and Engineering Task Consulting: The Engineering Work Request (EWR) and the Engineering Work Order (EWO) Relationship of the ECR/ECO and EWR/EWO to the Engineering Task Tracking Tool Relationship of the ECR/ECO and EWR/EWO to the Existing Configuration Control Process in the ARM Climate Research Facility(PIF/CAR, PRR, ORR, and BCR) Glossary Frequently Asked Questions (PDF, 173K) Engineering Work Request & Engineering Work Order Guidelines Process Guidelines for the Engineering Change Request/Engineering Change Order and Engineering Work Request/Engineering Work Order

271

Final Report: Fan Filter Unit Project  

NLE Websites -- All DOE Office Websites (Extended Search)

61684 61684 Demonstration of Advanced Filtration Technologies: Developing Energy-rebate Criteria through Performing Standard Laboratory Tests and Statistical Analyses Final Report (LBNL- 61684) To California Energy Commission 2007 Tengfang Xu and Duo Wang 2 Disclaimer This document was prepared as an account of work sponsored by the United States Government and California Energy Commission. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor California Energy Commission, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or

272

Name Title Work Phone Work E-Mail  

NLE Websites -- All DOE Office Websites (Extended Search)

12012 EOTA - STAFF Name Title Work Phone Work E-Mail Melissa Otero Program Manager 505-842-7112 motero@eota.energy.gov Janet Lee Online Learning Support Specialist 505-842-7110...

273

Work-Life Programs and Services  

Science Conference Proceedings (OSTI)

... NIST? Work Life Programs; Work Schedules. *. Bookmark and Share. Work-Life Programs and Services. Alternative ...

2011-09-22T23:59:59.000Z

274

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

uq/Uu.3/uo U-L:i ' rAA OuL a uo oUu. 0tri.l± i m,.i,*, u". run.' r.yrcir V e.u uq/Uu.3/uo U-L:i ' rAA OuL a uo oUu. 0tri.l± i m,.i,*, u". run.' r.yrcir V e.u O000DOE F 1325.8 (08-93) Department of Energy United States Government Department of Energy Memorandum OFFICE OF INSPECTOR GENERAL DATE: March 31,2006 REPLY TO ATTN OF: IG-34 (A05TG028) Audit Report No.: OAS-L-06-10 SUBJECT: Report on Audit of "The Department's Information Technology Capital Planning and Investment Control Process" TO: Chief Information Officer, IM-1 INTRODUCTION AND OBJECTIVE Federal guidance requires that Agencies develop and implement capital planning and investment control (CPIC) processes to help ensure that their major information technology investments achieve intended outcomes, represent the best allocation of resources, and reach strategic goals and objectives. The Department of Energy

275

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2/04 THU 14:52 FAX 423 241 3897 OIG -**- HQ l015 2/04 THU 14:52 FAX 423 241 3897 OIG -**- HQ l015 ol: Fi 13 5.8 (8-09) ÂŁ1*G (in'mi^)) United States Government Department of Energy Memorandum DATE: April. 22, 2004 REPLY TO ATTN OF: T -36 (A04RL018) Audit Report No.: OAS-L-04-15 SUBJECT: Audit of Disposition of Excess Facilities at the Hanford Site TO: Keith A. Klein, Manager, Richland Operations Office INTRODUCTION AND OBJECTIVE The Hanford Site (Hanford) is the largest of the three original defense production sites founded during World War II. Between 1943 and 1963, nine plutonium production reactors were built along the Columbia River and five processing facilities were built on the site's Central Plateau, with about 1,000 support facilities. Currently, Hanford has a total of 1,500 facilities of which an estimated 1,000 are excess to current and future mission

276

United States Goverment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UO/J±0ou4 TcdJ ± O:S'. Aa. ou* o *.I. I 01j ' . UO/J±0ou4 TcdJ ± O:S'. Aa. ou* o *.I. I 01j ' . - - 00E F 1325,8 (08-93) United States Goverment Department of Energy memorandum DATE: August 13, 2007 Audit Report Number: OAS-L-07-19 REPLY TO ATTN OF: IG-32 (A07PR059) SUBJECT: Audit of Executive Compensation at Selected Office of Science Sites TO: Chief Operating, Officer, Office of Science INTRODUCTION AND OBJECTIVE As part of a Department of Energy-wide audit of executive compensation, we reviewed seven Office of Science sites. Specifically, we reviewed executive compensation costs incurred ~,r claim~.- fr- F".*l*- Y. rs 2003, 2 , and 2005 at - Argonne National Laboratory (Argonne), Brookhaven National Laboratory (Brookhaven), Lawrence Berkeley National Laboratory (LBNL), Oak Ridge Institute for Science and Education, Oak Ridge National Laboratory, Princeton Plasma Physics

277

United States Government Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1/03 07:45 FAX 301 903 4656 CAPITAL REGION -* FORS FIVEA I002/004 1/03 07:45 FAX 301 903 4656 CAPITAL REGION -* FORS FIVEA I002/004 DOE F 1325 ' (8-69) EFO (07-90) United States Government Department of Eneray memorandum DATE: PR17 2003 Audit Report No.: OAS-L-03-14 REPLY TO ATTN OF: IG-34 (A03PT040) SUBJECT: Audit of the Office of Energy Efficiency and Renewable Energy's (EE) Grants, Subsidies, and Cost Sharing Arrangements TO: Assistant Secretary for Energy Efficiency and Renewable Energy, EE-1 The purpose of this report is to inform you of the results of our review of the Office of Energy Efficiency and Renewable Energy's (EE) incentive payments and cost-share arrangements. The review was initiated in February 2003, and fieldwork was conducted through April 2003 at Department of Energy (Department) Headquarters. Our methodology is described in the attachment to this report.

278

Solar heating unit  

SciTech Connect

A solar heating unit is disclosed for disposition exteriorly of a building window for heating the air within the space interiorly of the window embodying a casing with a transverse divider for creating a rear passage and a front passage which are in communication in their lower portions. The upper end of the rear passage connects with the forward end of a rearwardly extending lower duct having a cool air inlet at the rearward end thereof. The upper end of the front passage connects with the forward end of an upper duct progressing rearwardly above the lower duct and with there being a warm air outlet at the rearward extremity thereof. A heat exchanger is disposed within the front passage for impingement thereon of solar radiation passing through a transparent panel defining the front of said casing. A thermal responsive closure is provided at the upper end of said front passage for closing same when the temperature within the front passage has descended to a predetermined level.

Grisbrook, R.B.

1978-10-24T23:59:59.000Z

279

Second United Nations  

NLE Websites -- All DOE Office Websites (Extended Search)

i' i' Second United Nations t Jnternational Conference 1 , of Atomic Energy on the Peaceful Uses 4 i \ Confidential until official release during Conference ORIGINAL: ENGLISH METHODS O F PARTICLE DETECTION FOR HIGH-ENERGY PHYSICS EXPERIMENTS t * H. B r a d n e r and D. A. Glaser - INTRODUCTION J 1 % c Recent advances in our knowledge of t h e phenomena of high-energy physics and o'f the e l e m e n t a r y p a r t i c l e s h a s r e s u l t e d f r o m rapid advances in the technology of p a r t i c l e a c c e l e r a t o r s and the art of p a r t i c l e detection. cl'asses: (1) the "track-imaging" device in which one s e e s o r photographs t r a c k s which coincide with the a c t u a l path taken by the p a r t i c l e s , and ( 2 ) counting d e - v i c e s which give only an indication that the p a r t i c l e s p a s s somewhere in the

280

Beowawe Bottoming Binary Unit - Final Technical Report for EE0002856  

SciTech Connect

This binary plant is the first high-output refrigeration based waste heat recovery cycle in the industry. Its working fluid is environmentally friendly and as such, the permits that would be required with a butane based cycle are not necessary. The unit is modularized, meaning that the unit’s individual skids were assembled in another location and were shipped via truck to the plant site. This project proves the technical feasibility of using low temperature brine The development of the unit led to the realization of low temperature, high output, and environmentally friendly heat recovery systems through domestic research and engineering. The project generates additional renewable energy for Nevada, resulting in cleaner air and reduced carbon dioxide emissions. Royalty and tax payments to governmental agencies will increase, resulting in reduced financial pressure on local entities. The major components of the unit were sourced from American companies, resulting in increased economic activity throughout the country.

McDonald, Dale Edward

2013-02-12T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Public works for water and power development and energy research appropriations for Fiscal Year 1977. Part 5 (Pages 3625-4596). Energy Research and Development Administration. Hearings before the Committee on Appropriations, United States Senate, Ninety-Fourth Congress, Second Session on H. R. 14236  

SciTech Connect

H.R. 14236 is an act making appropriations for public works for water and power development and energy research, including the Corps of Civil Engineers, the Bureau of Reclamation, power agencies of the Department of the Interior, the Appalachian Regional Development Programs, the Federal Power Commission, the Tennessee Valley Authority, the Nuclear Regulatory Commission, the Energy Research and Development Administration, and related independent agencies and commissions for the fiscal year ending September 30, 1977. The subcommittee meeting on March 16, 1976, Senator John C. Stennis presiding, dealt with the Solar, Geothermal, and Advanced Energy Systems of the Energy Research and Development Administration. The hearing on March 18, 1976 dealt with the Naval Reactor Development Program and the Nuclear Weapons and Related Programs of ERDA; Senator John C. Stennis presided. The hearing on March 23, 1976, dealt with the Fission Power Reactor Development Program, ERDA; Senator John C. Stennis presided. The March 24, 1976 hearing dealt with the Biomedical and Environmental and Safety Research, Conservation Research and Development, and Program Support Sections, ERDA, again with Senator John C. Stennis presiding. A total of 45 witnesses' statements, communications, and prepared statements served as information presented at this hearing.

1976-01-01T23:59:59.000Z

282

Public works for water and power development and energy research appropriations for fiscal year 1978. Part I. Corps of Engineers: Lower Mississippi Valley Division; Missouri River Division; North Central Division; Pacific Ocean Division; South Pacific Division; Southwestern Division. Hearings before a Committee on Appropriations, United States Senate, Ninety-Fifth Congress, H. R. 7553  

SciTech Connect

Hearings on Public Works appropriations for fiscal year 1978 were conducted. On February 21, 1977, statements were heard from representatives of the Army Corps of Engineers in support of funds requested for water resources development projects in the Lower Mississippi Valley. On that same date, representatives from the North Central Division of the Corps of Engineers spoke in behalf of their request for funds for 1978. The area covers the north central U.S., from Montana to the St. Lawrence River, and from Canada to within 50 miles of St. Louis. On February 23, 1977, statements were heard from representatives of the South Pacific Division. This area encompasses the states of California, Nevada, Utah, Arizona, and portions of the five adjoining states. The Pacific Ocean Division representatives appeared on that same date before the Senate subcommittee. That area extends over the Pacific Ocean from Hawaii to territories of American Samoa and Guam and the Division is responsible for certain regulatory functions in the navigable waters of the Trust Territory of the Pacific Islands. On February 24, 1977, the subcommittee of the Committee on Appropriations heard representatives of the Southwestern Division covering portions of 8 states. Also on that date, representatives of the Missouri River Division (Nebraska and parts of 9 other states) presented statements concerning the operation of that system in order to justify that request for funds. (MCW)

1977-01-01T23:59:59.000Z

283

Total U.S. Housing Units.................................  

U.S. Energy Information Administration (EIA) Indexed Site

Housing Units (millions) Single-Family Units Apartments in Buildings With-- Space Heating Usage Indicators Million U.S. Housing Units Detached Attached Energy Information...

284

Maximal Reliability for Unit-weighted Composites  

E-Print Network (OSTI)

Maximal Reliability for Unit-weighted Composites Peter M.Maximal Reliability for Unit-weighted Composites Althoughconsistency coefficient for a unit-weighted composite. The

Peter M. Bentler

2011-01-01T23:59:59.000Z

285

Collaborative Unit Construction in Korean: Pivot Turns  

E-Print Network (OSTI)

A. (1996). Interactional units in conversation: Syntactic,M. (2000). The construction of units in conversational talk.character of grammatical units in conversation: Conditional

Ju, Hee

2011-01-01T23:59:59.000Z

286

Unsuspected Pulmonary Embolism in Observation Unit Patients  

E-Print Network (OSTI)

department observation unit. Emerg Med Clin North Am. 2001;ED) managed acute care unit on ED overcrowding and emergencyof a chest pain observation unit compared with routine care.

Limkakeng, Alexander T.; Glickman, Seth W; Cairns, Charles B; Chandra, Abhinav

2009-01-01T23:59:59.000Z

287

Maintenance Work Management Improvement: Improving Culture and Work Process  

Science Conference Proceedings (OSTI)

EPRI's Plant Maintenance Optimization (PMO) mission is to develop and demonstrate products and services for improved use of power plant maintenance resources and increased profitability. Based on a series of work management improvement projects, EPRI plans to develop a best practices guideline. As part of this effort, this document details how to improve fossil power plant work culture and work processes.

1998-06-16T23:59:59.000Z

288

CONVERT 15 WELLS TO BORS PUMPING UNITS AND TEST/COMPARE TO CONVENTIONAL UNITS  

Science Conference Proceedings (OSTI)

A new type of fluid lifting equipment called Balanced Oil Recovery System (trade named BORS Lift{trademark}) was installed on several idle oil wells to demonstrate the operating efficiency of this innovative equipment technology. The BORS Lift system is designed to bring oil to the surface without the accompanying formation water. The BORS Lift system uses an innovative strap mechanism that takes oil from the top of the downhole oilwater column and lifts it to the surface, eliminating production of the formation water. Eliminating salt water production could potentially increase oil production, reduce operational costs, benefit the environment, and cut salt water disposal costs. Although the BORS Lift units did not function as intended, lessons learned during the course of the field demonstration project resulted in improvements in the technology and redesign of subsequent generation BORS Lift units which are reported to have significantly improved their performance characteristics. BORS Lift units were installed on 15 temporarily abandoned wells which had been shut down due to low oil production, high water production, and uneconomic operating conditions. The wells had been producing with artificial lift at a high watercut from a shallow (850-900 feet), pressure depleted oil sand reservoir prior to being shut down. The electrical motor driven BORS Lift units provided a possible approach for economically returning the shallow, low-volume oil wells to production. The BORS Lift units used in this field demonstration were designed to recover up to roughly 22 barrels of fluid per day from depths ranging to 1,700 feet, ideal for many marginal stripper well operations. The BORS units were first-production-model test units, operated under oil field conditions for the first time, and were naturally expected to experience some design problems. From the onset, the operator experienced mechanical, design, and operational problems with the BORS Lift units and was unable to maintain un-interrupted production operations. The inventor provided considerable on-site technical support in an ongoing effort to correct the problems with the units and the inventor worked extensively with the operator to make design and manufacturing changes to the units to try to improve their reliability and performance. The operational problems were mostly related to the durability of the various components under oil field operating conditions such as inadequate mechanical, electrical, and electronic design for rough service, extended operation, and severe weather conditions. During the course of the demonstration project, it further appeared that the producing formation lacked sufficient reservoir energy and/or favorable oil properties to mobilize and displace oil from the formation into the well bore in order to recharge the oil column in the well. The BORS Lift units were then moved to a second lease which appeared to have more favorable WTI quality oil properties. Eight of these units were reported to have been installed and placed in operation on the second lease, however, operational difficulties continued. It was determined that the units were inadequately designed and would need to be replace by improved second generation units. Due to the lack of success with the first generation units and the extra cost to replace them with the redesigned units, the operators decided not to continue with the project and the project was terminated at that point.

Walter B. North

2003-02-04T23:59:59.000Z

289

Ultrasonic Transducers and Search Units  

Science Conference Proceedings (OSTI)

Table 2   Primary applications of ultrasonic search units...tears, seams, cracks Castingsâ??slag, porosity, cold shuts, tears, shrinkage cracks,

290

OpenEI - United Nations  

Open Energy Info (EERE)

http:en.openei.orgdatasetstaxonomyterm5810 en Overview of the United Nations Environment Programme's Solar and Wind Energy Resource Assessment (SWERA) Project http:...

291

Radiation Safety Work Control Form  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiation Safety Work Control Form Radiation Safety Work Control Form (see instructions on pg-2) Rev July-2012 Area: Form #: Date: Preliminary Applicability Screen: (a) Will closing the beam line injection stoppers mitigate the radiological hazards introduced by the proposed work? Yes No (b) Can the closed state of the beam line injection stoppers be assured during the proposed work (ie., work does NOT involve injection stoppers or associated HPS)? Yes No If the answers to both questions are yes, the work can be performed safely under an SSRL RSWCF. If the answer to either question is no, then the work must be performed under a SPEAR3 RSWCF. Section 1: Description of work to be done, including date and time. (Person Responsible completes section)

292

The Work for Others Agreement  

NLE Websites -- All DOE Office Websites (Extended Search)

were granted the authority to perform work for others by the Atomic Energy Act of 1954 Public Law 83-703; 42 USC 2053. Work For Others programs at the DOE national...

293

How does the brain work?  

NLE Websites -- All DOE Office Websites (Extended Search)

Conceptually though it's a widget to get folks from where they live to where they work, and it works by figuring out the paths they take, assigning trains to those routes,...

294

Solid Oxide Fuel Cell Auxiliary Power Unit  

SciTech Connect

Solid Oxide Fuel Cell (SOFC) is an attractive, efficient, clean source of power for transportation, military, and stationary applications. Delphi has pioneered its application as an auxiliary Power Unit (APU) for transportation. Delphi is also interested in marketing this technology for stationary applications. Its key advantages are high efficiency and compatibility with gasoline, natural gas and diesel fuel. It's consistent with mechanizations that support the trend to low emissions. Delphi is committed to working with customers and partners to bring this novel technology to market.

J. Weber

2001-12-12T23:59:59.000Z

295

Live Work Guide for Substations  

Science Conference Proceedings (OSTI)

Live work (work on energized circuits) is the preferred method of maintenance where system integrity, system reliability, and operating revenues are at a premium and removal of a circuit or a substation from service is not acceptable. Live work (LW) may also be beneficial in construction and storm damage repair. Furthermore, live work may be unavoidable in the case of substations that serve essential facilities such as hospitals, law enforcement, fire departments, and intrusion alarms if standby local ge...

2004-10-28T23:59:59.000Z

296

Defective insulators in live working on a 550kV compact steel lattice tower  

Science Conference Proceedings (OSTI)

Research was conducted to determine the minimum number of healthy insulator units needed to ensure worker safety in live working on a compact 550 kV steel lattice tower. A large variety of worksite conditions was investigated. Test results confirm the conservative nature of the CIGRE formula for defective insulator units, and modifications to the formula are suggested. The recommended number of healthy units is 12 in a string of 24 units for the case of live work on the compact 550 kV tower, when the Portable Protective Gap (PPG) is used. Adjustment for altitude should be made above 900 m (3,000 ft).

Gela, G. [EPRI Power Delivery Center, Lenox, MA (United States); Kientz, H. [Western Area Power Administration, Golden, CO (United States); Fox, H.J. Jr. [Public Service Electric and Gas, Bridgewater, NJ (United States); Mitchell, J.D. [Alabama Power Co., Birmingham, AL (United States); Lyons, P.F. [EPRI, Haslet, TX (United States)

1997-04-01T23:59:59.000Z

297

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

3 Household Characteristics by Owner-Occupied Housing Unit, 2005" " Million U.S. Housing Units" ,," Owner-Occupied Housing Units (millions)","Type of Owner-Occupied Housing Unit"...

298

NIST: Hydrocarbons - Special Units, ... and Useful Conv. ...  

Science Conference Proceedings (OSTI)

5. Special Units, Fundamental Constants, and Useful Conversion Factors. 5.a. Special Units. ... 5.b. Fundamental Constants and Conversion Factors. ...

299

International System of Units from NIST  

Science Conference Proceedings (OSTI)

... Background Definitions of the SI base units and their historical context International aspects of the SI Unit conversions. Bibliography ...

300

United States Environmental Protection Agency  

E-Print Network (OSTI)

, University of Salford, Salford, UK. Nigel Langford is in the BNFL Corporate Communication Research Unit, University of Salford, Salford, UK. Richard J. Varey is in the BNFL Corporate Communication Research Unit University Press . ISSN 1356-3289 #12;As organizations grow and segment through specialization, so do zones

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

July 2012, Work Force Retention Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - anticipated completion no later than September, assuming timely OMB review and approval. 2. Draft PF Working Group charter final review by senior management to be

302

,"Housing Units1","Average Square Footage Per Housing Unit",...  

U.S. Energy Information Administration (EIA) Indexed Site

the U.S. Department of Energy's Office of Energy and Efficiency and Renewable Energy (EERE). 5Rented includes households that occupy their primary housing unit without payment of...

303

Advanced Unit Commitment Strategies in the United States Eastern Interconnection  

DOE Green Energy (OSTI)

This project sought to evaluate the impacts of high wind penetrations on the U.S. Eastern Interconnection and analyze how different unit commitment strategies may affect these impacts.

Meibom, P.; Larsen, H. V.; Barth, R.; Brand, H.; Tuohy, A.; Ela, E.

2011-08-01T23:59:59.000Z

304

FACT SHEET: BIOENERGY WORKING GROUP  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2010 , 2010 1 FACT SHEET: BIOENERGY WORKING GROUP At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers launched a Bioenergy Working Group, which will advance the deployment of bioenergy technologies by implementing recommendations of the Technology Action Plan on Bioenergy Technologies that was released by the Major Economies Forum Global Partnership in December 2009. The Working Group will work in close cooperation with the Global Bioenergy Partnership (GBEP), which is co-chaired by Brazil and Italy. Initial key activities of the Working Group include: 1. Global Bioenergy Atlas: The Working Group will combine and build upon existing databases of sustainably-developed bioenergy potential around the globe and make it available in an open web-

305

Reversible (unitized) PEM fuel cell devices  

DOE Green Energy (OSTI)

Regenerative fuel cells (RFCs) are enabling for many weight-critical portable applications, since the packaged specific energy (>400 Wh/kg) of properly designed lightweight RFC systems is several-fold higher than that of the lightest weight rechargeable batteries. RFC systems can be rapidly refueled (like primary fuel cells), or can be electrically recharged (like secondary batteries) if a refueling infrastructure is not conveniently available. Higher energy capacity systems with higher performance, reduced weight, and freedom from fueling infrastructure are the features that RFCs promise for portable applications. Reversible proton exchange membrane (PEM) fuel cells, also known as unitized regenerative fuel cells (URFCs), or reversible regenerative fuel cells, are RFC systems which use reversible PEM cells, where each cell is capable of operating both as a fuel cell and as an electrolyzer. URFCs further economize portable device weight, volume, and complexity by combining the functions of fuel cells and electrolyzers in the same hardware, generally without any system performance or efficiency reduction. URFCs are being made in many forms, some of which are already small enough to be portable. Lawrence Livermore National Laboratory (LLNL) has worked with industrial partners to design, develop, and demonstrate high performance and high cycle life URFC systems. LLNL is also working with industrial partners to develop breakthroughs in lightweight pressure vessels that are necessary for URFC systems to achieve the specific energy advantages over rechargeable batteries. Proton Energy Systems, Inc. (Proton) is concurrently developing and commercializing URFC systems (UNIGEN' product line), in addition to PEM electrolyzer systems (HOGEN' product line), and primary PEM fuel cell systems. LLNL is constructing demonstration URFC units in order to persuade potential sponsors, often in their own conference rooms, that advanced applications based on URFC s are feasible. Safety and logistics force these URFC demonstration units to be small, transportable, and easily set up, hence they already prove the viability of URFC systems for portable applications.

Mitlitsky, F; Myers, B; Smith, W F; Weisberg, Molter, T M

1999-06-01T23:59:59.000Z

306

Robotic Technologies for Live Working  

Science Conference Proceedings (OSTI)

The objective of this report is to review selected available robotic technologies and evaluate their possible applicability to live working. The selection criteria for robotic technologies included suitability for operation in a high-voltage environment; mechanical load capacity; and extent of reach, size, and weight compatible with live work applications. The report provides a brief history of robotics in live work dating back to late 1970s and the development of the EPRI TOMCAT (Teleoperator for Operat...

2010-12-23T23:59:59.000Z

307

September 2012, Work Force Retention Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 [Protective Force Personnel Medical, Physical Readiness, Training, and Access Authorization Standards] as a final rule that includes modification efforts to address barriers to workforce retention. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - publication anticipated this month.

308

Construction Work in Progress (Kansas)  

Energy.gov (U.S. Department of Energy (DOE))

This Act allows nuclear power plants to qualify for recovery of Construction Work in Progress (CWIP) and other preconstruction expenditures in rates. Previously, nuclear power plants were excluded...

309

Work Family Community, Human Resources  

NLE Websites -- All DOE Office Websites (Extended Search)

Work-Life Balance Programs Adoption Assistance Program Benefits Blood Drives Brookhaven Employee's Recreation Association (BERA) Brookhaven Retired Employee Association (BREA)...

310

Radiation Safety Work Control Form  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiation Safety Work Control Form (see instructions on pg-2) Rev July-2012 Area: Form : Date: Preliminary Applicability Screen: (a) Will closing the beam line injection stoppers...

311

Energy Impact of Residential Ventilation Norms in the United States  

E-Print Network (OSTI)

-264 ­ 1.278. American Council for an Energy Efficient Economy, Washington, DC. 14. Gusdorf, J., Swinton, MLBNL 62341 Energy Impact of Residential Ventilation Norms in the United States Max H. Sherman and Iain S. Walker Environmental Energy Technologies Division February 2007 This work was supported

312

U.S. and India hold the Third Meeting of the Indo-United States Civil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and India hold the Third Meeting of the Indo-United States and India hold the Third Meeting of the Indo-United States Civil Nuclear Energy Working Group U.S. and India hold the Third Meeting of the Indo-United States Civil Nuclear Energy Working Group March 17, 2010 - 12:54pm Addthis India hosted the third meeting of the Indo-United States Civil Nuclear Energy Working Group in Mumbai, on Feb. 3-4, 2010. Civil nuclear is one of five working groups established under the Energy Dialogue as a result of the 2005 Joint Statement issued by then President Bush and Prime Minister Singh. The Working Group first met in 2006 and held its second meeting after the U.S. and Indian governments completed the Indo-U.S. Civil Nuclear Cooperation Agreement. The Agreement, signed in October 2008, aims to provide new opportunities for trade and job creation for both economies; to

313

Transuranic Waste Transportation Working Group Agenda | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transportation Working Group Agenda Transuranic Waste Transportation Working Group Agenda Transuranic Waste Transportation Working Group Agenda More Documents & Publications...

314

United Nations Economic and Social Council | Open Energy Information  

Open Energy Info (EERE)

Council Council Jump to: navigation, search Name United Nations Economic and Social Council Website http://www.un.org/en/ecosoc/in References United Nations Economic and Social Council[1] LinkedIn Connections Background "ECOSOC was established under the United Nations Charter as the principal organ to coordinate economic, social, and related work of the 14 UN specialized agencies, functional commissions and five regional commissions. The Council also receives reports from 11 UN funds and programmes. The Economic and Social Council (ECOSOC) serves as the central forum for discussing international economic and social issues, and for formulating policy recommendations addressed to Member States and the United Nations system. It is responsible for: promoting higher standards of living, full employment, and economic

315

I~ Central Nevada-40 UNITED STATES DEPARTMENT OF THE INTERIOR  

NLE Websites -- All DOE Office Websites (Extended Search)

i i I~ Central Nevada-40 UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Federal Center, Denver, Colorado 80225 USGS-474-90 SUMMARY OF HYDRAULIC TESTING IN AND CHEMICAL ANALYSES OF WATER SAMPLES FROM DEEP EXPLORATORY HOLES IN LITTLE FISH LAKE, MONITOR, HOT CREEK, AND LITTLE SMOKY VALLEYS, NEVADA By George A. Dinwiddie and leRoy J. Schroder ,.....---'-------.,... NOT ICE - - - - - - - - - - , .This report was prepared as an account of work . sponsored by. the. United States Government. Neither the United States nor the ·United States Atomic Energy Commission, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accurac y, com- pleteness or usefulness of any information, apparatus, product or process disclosed, or represents that its

316

New Mexico grape growers unite  

NLE Websites -- All DOE Office Websites (Extended Search)

New Mexico grape growers unite, increase production New Mexico grape growers unite, increase production Grape Growers Association enlivens agriculture Growers association unites small parcels of land, enlivens production, protects water rights for Northern New Mexico agriculturists. August 6, 2012 Northern New Mexico Micro Grape Growers Association The NMSBA Entrepreneurial Networking program is helping Lucia Sanchez (C) Tim Martinez (R) and Robert Naranjo, the Northern New Mexico Micro Grape Growers Association, put small parcels of land back into production in Rio Arriba County. Contact Mariann Johnston (505) 667-4391 Email New Mexico grape growers unite to increase production, with help of Northern New Mexico Connect Over the last decade, a string of wineries has come to grace the scenic High Road to Taos. In 2010, Robert Naranjo, network facilitator for the

317

Energy Management in Olefins Units  

E-Print Network (OSTI)

The previous generations of olefin units were typically importers of utilities such as high pressure steam and electricity. But, in the new generation of units, diligent energy conservation efforts have reduced the high pressure steam demand to the point where waste heat from pyrolysis generates more than enough steam to power the olefins unit recovery section. Furthermore, incorporating gas turbine driven electrical generators or process compressors adds to the utility export potential of the unit. It is necessary, therefore, to consider utility export as a valuable byproduct of olefins production and incorporate it within the utility network of the petrochemical complex. As with any byproduct of a process, it is necessary to be able to control its production and distribution.

Wells, T. A.

1982-01-01T23:59:59.000Z

318

DROUGHT IN THE UNITED STATES  

Science Conference Proceedings (OSTI)

Using state monthly values of the Palmer Drought Index from January 1895 through April 1981, thespatial and temporal features of dry and wet episodes over the contiguous United States were analyzed. Thevariance spectrum of the area under both ...

Henry F. Diaz

1983-01-01T23:59:59.000Z

319

(12) United States Patent x ...................................  

Science Conference Proceedings (OSTI)

... The electrical resistance per unit length of each section ... 4(b): T2>TI' The electric field in each ... 0I holes were drilled through the cooling copper blocks ...

2010-07-27T23:59:59.000Z

320

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL  

Office of Legacy Management (LM)

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community Improvement Corporation 720 Mound Road Miamisburg, Ohio 45342-6714 Dear Mr. Bird: The Core Team, consisting of the U.S. Department of Energy Miamisburg Environmental Management Project (DOE-MEMP), U.S. Environmental Protection Agency (USEPA), and the Ohio Environmental Protection Agency (OEPA), appreciates your comments on the Work

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

The future of crowd work  

Science Conference Proceedings (OSTI)

Paid crowd work offers remarkable opportunities for improving productivity, social mobility, and the global economy by engaging a geographically distributed workforce to complete complex tasks on demand and at scale. But it is also possible that crowd ... Keywords: crowd work, crowdsourcing, organization design, research vision

Aniket Kittur; Jeffrey V. Nickerson; Michael Bernstein; Elizabeth Gerber; Aaron Shaw; John Zimmerman; Matt Lease; John Horton

2013-02-01T23:59:59.000Z

322

FY 1994 Annual Work Plan  

SciTech Connect

This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

Not Available

1993-10-01T23:59:59.000Z

323

OpenEI - United States  

Open Energy Info (EERE)

United States United States Renewable Energy Technical Potential http://en.openei.org/datasets/node/912 License

324

Indexes of pumps for oil field pumping units  

Science Conference Proceedings (OSTI)

As reported previously, a series of oil field pumping units has been developed with power outputs of 125, 250, 500, and 1000 kW, designed for injecting working fluids in cementing operations in oil and gas wells, hydraulic fracturing of formations, washing out sand plugs, and other production operations. The units are designed for the use of three-plunger pumps with individual power outputs of 125 or 500 kW. In the 250- and 1000-kW units, two such pumps are used. The 1000-kW pumping unit serves mainly for deep-penetration hydraulic fracturing of formations, and also for fracturing deep formations. The hydraulic fracturing process does not require the use of units with two pumps; this has been demonstrated by experience, both here and in other countries. All units intended for use in hydraulic fracturing are built with a single pump, transmission, and drive. Pumping units for well cementing must have two pumps that will give a high delivery rate. At the start of the operation, a single pump can be used to feed water into the cement mixer, with the second pump used to transfer the cement slurry to the well. Then both pumps are connected to the slurry injection line. The operation of these pumps is described.

Ibragimov, E.S.

1995-07-01T23:59:59.000Z

325

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

which administers the state’s Renewable Energy Trust Fund,among state policymakers interested in renewable energy.of State Clean Energy Funds with Tradable Renewable

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

326

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

owned, utility-scale wind turbines interconnected on eitherlarge, utility-scale wind turbines that dot the landscape,most of those Danish wind turbines are owned by one or more

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

327

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

7 3.1.3 Xcel Energy’s Small Wind Tariff andXcel Energy’s small wind tariff and standardized powercomply. 4 3.1.3 Xcel Energy’s Small Wind Tariff and PPA To

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

328

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

5 3.1.1 Xcel Energy’s Wind7 3.1.3 Xcel Energy’s Small Wind Tariff and7 3.1.5 Xcel Energy’s Renewable Development

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

329

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

incentives supporting smaller wind projects in Minnesota. In 2003, Wisconsin Focus on Energy (the state’s clean energy

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

330

United Nations Conference on Trade and Development Making Certification Work for Sustainable  

E-Print Network (OSTI)

in transferring to biofuels to meet their biofuel blending targets, considering that they do not have the land per cent minimum target for the share of biofuels in transport petrol and diesel consumption by 2020.7 Ministers further agreed that the binding character of the biofuel target should be subject to production

331

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

States, where a single wind farm might stretch on for mileslarge California wind farms, Danish turbine manufacturersbased 100 MW Trimont wind farm as the successful bidder;

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

332

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

and incentives supporting smaller wind projects in Minnesota. In 2003, Wisconsin Focus on Energy (the state’

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

333

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

a small surcharge on electricity bills) funded Cooperativetheir monthly electricity bills, resulting in savings of

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

334

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

over the proposed 420 MW offshore Cape Wind project, and theoffshore from – their borders, and are turning to community-scale wind

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

335

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

funds be used for renewable energy production incentives, $incentive – the Renewable Energy Production Incentive, orProduction Incentive 7 3.1.5 Xcel Energy’s Renewable

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

336

Estimate of Maximum Underground Working Gas Storage Capacity in the United States  

Reports and Publications (EIA)

This report examines the aggregate maximum capacity for U.S. natural gas storage. Although the concept of maximum capacityseems quite straightforward, there are numerous issues that preclude the determination of a definitive maximum volume. Thereport presents three alternative estimates for maximum capacity, indicating appropriate caveats for each.

Information Center

2006-09-19T23:59:59.000Z

337

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

Reading, Writing, Wind Energy & Arithmetic. Case Study:of the Politics of Wind Energy Innovation in California and10% in 2015. Xcel’s wind energy mandate, which at the time

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

338

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

Support for Community Wind Power Development. LBNL-54715.at 2003 Oklahoma Wind Power and Bioenergy Conference, JuneWind. 2001. Distributed Wind Power Assessment. Prepared for

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

339

Estimate of Maximum Underground Working Gas Storage Capacity in the United States: 2007 Update  

Reports and Publications (EIA)

This report provides an update to an estimate for U.S. aggregate natural gas storage capacity that was released in 2006.

Information Center

2007-10-23T23:59:59.000Z

340

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

Iowa’s 1993 statewide net metering (called “net billing” inturbine can still be on a net metering tariff, but only thereceive the benefits of net metering (which is limited to 60

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

stemmed from a commitment made by WTS management to CBFO in May to "promote safety consciousness while we perform our work" and "improve our ability to manage people in a...

342

file://\\Bellview\TeamWorks\TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

8/03 TRU TeamWorks will resume printing on January 8, 2004 | Shipments expected this we 8/03 TRU TeamWorks will resume printing on January 8, 2004 | Shipments expected this we December 18, 2003 The Big Story: It's a wrap - 2003 Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e- mail. WIPP Shipments (as of 12/18/03 at 8:14 a.m.) Shipments scheduled to arrive at WIPP this week 23 Total shipments received at WIPP 2,226 In 2003, the WIPP team delivered in every mission-essential area. TRU TeamWorks wraps up the calendar year with 2003's performance highlights. Steve Warren, Washington TRU Solutions (WTS) general manager, says, "I view

343

Million U.S. Housing Units Total............................................................................  

U.S. Energy Information Administration (EIA) Indexed Site

Attached Attached 2 to 4 Units Table HC2.12 Home Electronics Usage Indicators by Type of Housing Unit, 2005 5 or More Units Mobile Homes Type of Housing Unit Housing Units (millions) Single-Family Units Apartments in Buildings With-- Home Electronics Usage Indicators Detached Energy Information Administration: 2005 Residential Energy Consumption Survey: Preliminary Housing Characteristics Tables Million U.S. Housing Units Attached 2 to 4 Units Table HC2.12 Home Electronics Usage Indicators by Type of Housing Unit, 2005 5 or More Units Mobile Homes Type of Housing Unit Housing Units (millions) Single-Family Units Apartments in Buildings With-- Home Electronics Usage Indicators Detached Status of PC When Not in Use Left On..............................................................

344

Rev. 4/13 This version supersedes any earlier revisions. GS-516 Work-Study Process Map  

E-Print Network (OSTI)

the number of work-study units the program may use during the academic year. The e-mail contains detailed the work-study appointment. 2 Graduate Program reviews 20xx-20xx Work-Study Awarding Guidelines #12;Rev. 4 regarding the cost-sharing component of the work-study program. #12;Rev. 4/13 This version supersedes any

Hammock, Bruce D.

345

FORMAL APPEAL AGAINST ASSESSMENT You may appeal the mark awarded for an assessment task or final result for a unit if you have evidence that  

E-Print Network (OSTI)

or final result for a unit if you have evidence that the mark or grade you received is unfair or incorrect. Assessment method differs from the description in the unit outline A copy of the unit outline A copy in the published unit outline b. Assessment criteria used to evaluate the work differs from the agreed assessment

346

Optimal weight tuning method for unit selection cost functions in syllable based text-to-speech synthesis  

Science Conference Proceedings (OSTI)

This paper proposes a method for tuning the weights of unit selection cost functions in syllable based text-to-speech (TTS) synthesis system. In this work, unit selection cost functions, namely target cost and concatenation cost, are designed appropriate ... Keywords: Concatenation cost, Genetic algorithm, Target cost, Text-to-speech synthesis, Tuning of weights, Unit selection

N. P. Narendra; K. Sreenivasa Rao

2013-02-01T23:59:59.000Z

347

RHIC II Science Working Groups  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshops Workshops The series of RHIC II Science Workshops began in November 2004, at which time seven Working Groups were initiated. These groups met in workshops through 2005, with the purpose of providing an organized forum for the community to address and describe quantitatively the most important science issues for the proposed RHIC II luminosity upgrade, and corresponding detector upgrades. Each Working Group was led by three convenors representing theory and experiment, and each has produced a detailed report (except for the "New Directions" group, which provided a sounding board and input to the other groups). The Working Group reports are linked below. The summary "white paper" document, "Future Science at the Relativistic Heavy Ion Collider" (PDF), is based on these reports, and was prepared by a Writing Committee that included at least one convenor from each of the Working Groups.

348

Working with Modules within Python  

NLE Websites -- All DOE Office Websites (Extended Search)

Working with Modules within Perl and Python Working with Modules within Perl and Python Working with Modules within Perl and Python It can often be convenient to work with the modules system from within perl or python scripts. You can do this! Using Modules within Python The EnvironmentModules python package gives access to the module system from within python. The EnvironmentModules python package has a single function: module. Using this function you can provide the same arguments you would to "module" on the command line. The module() function accepts a list of arguments, like ['load','']; or ['unload','']. >>> import EnvironmentModules as EnvMod >>> EnvMod.module(['load','blast+']) It is important to understand that this is most effective for scripts

349

Clean Energy Works Oregon (Oregon)  

Energy.gov (U.S. Department of Energy (DOE))

Clean Energy Works began in 2009 as a pilot program run by the City of Portland. In 2010, the US department of Energy awarded $20 million to create a statewide nonprofit to expand the program...

350

DOE Work Breakdown Structure Handbook  

Energy.gov (U.S. Department of Energy (DOE))

This handbook provides suggested guidance and best practices on the development of product-oriented Work Breakdown Structures (WBS) that should be used by all projects within DOE to organize and...

351

FY 1994 Annual Work Plan  

SciTech Connect

In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

1993-09-30T23:59:59.000Z

352

First Aid at Work Introduction  

E-Print Network (OSTI)

provided. 2. People, wherever they work in our industry, can suffer injury or be taken ill. It is essential such equipment and facilities as are adequate and appropriate in the circumstances for enabling first

353

Transfer Rate vs. I/O Units  

NLE Websites -- All DOE Office Websites (Extended Search)

O Units Transfer Rate vs. IO Units These plots show the transfer rate from the IO benchmarks as a function of the number of elizaio units in use for each particular eliza at the...

354

United Energy | Open Energy Information  

Open Energy Info (EERE)

United Energy United Energy Name United Energy Address 284, Old Deal Rd Place Eatontown, New Jersey Zip 07722 Sector Solar Product Energy Efficiency, Renewable Energy Year founded 2009 Number of employees 1-10 Phone number 201-697-8770 Website http://www.unitedenergypro.com Coordinates 40.2785975°, -74.0359722° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.2785975,"lon":-74.0359722,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

355

United States Environmental Monitoring EPA  

Office of Legacy Management (LM)

United United States Environmental Monitoring EPA 600/R-93/141 Environmental Protection Systems Laboratory January 1992 Agency P.O. Box 93478 Las Vegas NV 89193-3478 Research and Development _EPA Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1991 Available to DOE and DOE contractors from the Office of Scientificand Technical Information, P.O. Box 62, Oak ridge,TN 39831; pricesavailablefrom (615) 576-8401 Availableto the publicfrom the NationalTechnicalInformationService, U.S. Departmentof Commerce, 5285 Port Royal Road, Springfield, VA 22161 Price Code: PrintedCopyof MicroficheA01 Frontand back cover: CommunityMonitorStation (front) and Whole BodyLaboratory(back), Craig A. Tsosle EnvironmentalMonitoringSystemsLaboratory-LasVegas, Nevada Offsite Environmental Monitoring Report:

356

unit process | OpenEI  

Open Energy Info (EERE)

unit process unit process Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included. Source US Life Cycle Inventory Database Date Released May 01st, 2011 (3 years ago) Date Updated Unknown Keywords ASCC FRCC HICC interconnect region LCI life cycle inventory MRO NPCC RFC SERC SPP TRE unit process US utilities WECC Data application/zip icon interconnect_lci_datasets_2008.zip (zip, 6.3 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

357

Did You Know, BNL United Way Campaign  

NLE Websites -- All DOE Office Websites (Extended Search)

and independent United Ways in the nation. The United Way of Long Island raises money for over 180+ health and human service agencies, which provide services to children...

358

United Oil Company | Open Energy Information  

Open Energy Info (EERE)

United Oil Company Jump to: navigation, search Name United Oil Company Place Pittsburgh, Pennsylvania Product Vegetable-Oil producer Biodiesel producer based in Pittsburgh, PA...

359

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

3 Lighting Usage Indicators by Number of Household Members, 2005" " Million U.S. Housing Units" ,,"Number of Households With --" ,"Housing Units (millions)" ,,"1 Member","2...

360

Million U.S. Housing Units Total...............................  

Gasoline and Diesel Fuel Update (EIA)

Units (millions) Single-Family Units Apartments in Buildings With-- Home Electronics Usage Indicators Detached Energy Information Administration: 2005 Residential Energy...

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

7 Air-Conditioning Usage Indicators by Number of Household Members, 2005" " Million U.S. Housing Units" ,,"Number of Households With --" ,"Housing Units (millions)" ,,"1 Member","2...

362

GEO UNIT AGREEMENT | Open Energy Information  

Open Energy Info (EERE)

UNIT AGREEMENT Jump to: navigation, search GEO UNIT AGREEMENT Mineral interest joined together to explore, develop and produce geothermal resources Retrieved from "http:...

363

NIST Realization of related photometric units  

Science Conference Proceedings (OSTI)

... Luminance units are commonly established using a white reflectance standard or ... the NIST standard photometers to realize the luminance unit on a ...

2012-10-02T23:59:59.000Z

364

THE UNITED STATES AND THE METRIC SYSTEM  

Science Conference Proceedings (OSTI)

... time the United States became a dominant force in world trade and was able to impose its products, manufactured in their unconventional units, on ...

2010-07-27T23:59:59.000Z

365

United Biofuels Private Limited | Open Energy Information  

Open Energy Info (EERE)

Page Edit with form History Facebook icon Twitter icon United Biofuels Private Limited Jump to: navigation, search Name United Biofuels Private Limited Place Tamil Nadu, India...

366

United Biofuels Inc | Open Energy Information  

Open Energy Info (EERE)

United Biofuels Inc Jump to: navigation, search Name United Biofuels Inc Place Plover, Wisconsin Zip 54467 Sector Biomass Product Wisconsin-based manufacturer and distributor of...

367

Work Plan - U.S.-India Coal Working Group | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Plan - U.S.-India Coal Working Group Work Plan - U.S.-India Coal Working Group Work Plan - U.S.-India Coal Working Group More Documents & Publications HSS Work Group Telecom...

368

Energy Audits in Process Units  

E-Print Network (OSTI)

Emphasis is placed on practical considerations in the effective organization and execution of a successful in-house energy audit of a process unit, based upon experience gained in several such audits of Gulf Coast petrochemical units. Staffing requirements, membership qualifications, probable time span for the audit, cost-benefit ratios, and necessary line management commitment are discussed. The scope and importance of pre-audit preparation and related responsibilities are explained. Activities of the Audit Team are likely to fall naturally into six general phases, each of which is reviewed in detail.

Corwin, J. D.

1980-01-01T23:59:59.000Z

369

U.S. and India Hold the Second Meeting of the Indo-United States Civil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

India Hold the Second Meeting of the Indo-United States India Hold the Second Meeting of the Indo-United States Civil Nuclear Energy Working Group U.S. and India Hold the Second Meeting of the Indo-United States Civil Nuclear Energy Working Group April 30, 2009 - 12:00am Addthis The United States hosted the second meeting of the U.S.-India Civil Nuclear Energy Working Group at Idaho National Laboratory on April 28-30, 2009. This was the first meeting held by the Working Group since entry into force of the U.S.-India peaceful nuclear cooperation agreement. The agreement, signed in October 2008, aims to provide new opportunities for trade and job creation for both economies, help India meet its rapidly increasing energy needs in an environmentally responsible way, and enhance global nonproliferation efforts by bringing India closer to the nonproliferation

370

Improvement of Advanced Microwave Sounding Unit Tropical Cyclone Intensity and Size Estimation Algorithms  

Science Conference Proceedings (OSTI)

Previous work, in which Advanced Microwave Sounding Unit (AMSU) data from the Atlantic Ocean and east Pacific Ocean basins during 1999–2001 were used to provide objective estimates of 1-min maximum sustained surface winds, minimum sea level ...

Julie L. Demuth; Mark DeMaria; John A. Knaff

2006-11-01T23:59:59.000Z

371

United States-Russia Joint Statement on the Results of the Nuclear...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

States-Russia Joint Statement on the Results of the Nuclear Energy and Nuclear Security Working Group Meeting United States-Russia Joint Statement on the Results of the Nuclear...

372

United States and Canada. The Tennessee Department  

NLE Websites -- All DOE Office Websites (Extended Search)

insect traps insect traps You may have noticed purple "boxes" hanging in area trees lately. These are three-sided insect traps for monitoring the spread of a non-native invasive insect that has killed several million ash trees in the eastern United States and Canada. The Tennessee Department of Agriculture has installed over 3500 of them in ash trees throughout the state. Working with the state we've placed several traps on the Oak Ridge Reservation to help determine the extent of the infestation. "The insect, called the emerald ash borer, hasn't been detected in Roane and Anderson Counties, which is home to the Department of Energy Reservation", reports Greg Byrd, forester with the ORNL Natural

373

United Functions and Objects: an Overview  

E-Print Network (OSTI)

United Functions and Objects (UFO) is a general-purpose, implicitly parallel language designed to allow a wide range of applications to be efficiently implemented on a wide range of parallel machines while minimising the conceptual difficulties for the programmer. To achieve this, it draws on the experience gained in the functional and object-oriented "worlds" and attempts to bring these worlds together in a harmonious fashion. This report concentrates on examples which illustrate various aspects of UFO, including the various encapsulation and abstraction mechanisms it provides, and the various forms of parallelism which can be exploited. Copyright c fl1993. All rights reserved. Reproduction of all or part of this work is permitted for educational or research purposes on condition that (1) this copyright notice is included, (2) proper attribution to the author or authors is made and (3) no commercial gain is involved. Technical Reports issued by the Department of Computer Science, Ma...

John Sargeant; John Sargeant

1993-01-01T23:59:59.000Z

374

Units  

NLE Websites -- All DOE Office Websites (Extended Search)

Unidades Unidades Principal ESTOY PERDIDO!!! En la Aventura de la Partículas, usamos a menudo distintas unidades, sin explicar formalmente qué significan. Aquí le damos una breve sinopsis de las unidades más comunes en la física de partículas: Energía: en electrón-volts (eV). La energía ganada por un electrón que remonta una diferencia de potencial de un volt. 1 eV = 1.6 x 10^(-19) joules. Un MeV es un millón de electrón volts, y un GeV es un billón de electrón volts. Un GeV es aproximadamente 1/1000 de la energía cinética de un mosquito! Masa: en GeV/c2 (un billón de electrón volts dividido por la velocidad de la luz al cuadrado. La masa es medida en términos de energía, debido a que la masa es justamente una forma de energía -- recuerde .) 1 GeV es

375

Coal Distribution Assesment at Martin Lake Unit 1  

Science Conference Proceedings (OSTI)

The measurement and control of pulverized coal in the conduits of power boilers has been the subject of several recent EPRI studies. Results from these studies have made clear the extent and limitations of many measurement approaches through the work conducted at EPRI's Coal Flow Laboratory. This project is the first to apply concepts learned from coal loop studies in the field. The candidate unit is a 750-MW twin-tangential boiler equipped with 10 coal elevations. Because this unit fires a high-moisture...

2007-02-19T23:59:59.000Z

376

Extracting work from quantum systems  

E-Print Network (OSTI)

We consider the task of extracting work from quantum systems in the resource theory perspective of thermodynamics, where free states are arbitrary thermal states, and allowed operations are energy conserving unitary transformations. Taking as our work storage system a 'weight' we prove the second law and then present simple protocols which extract average work equal to the free energy change of the system - the same amount as in classical thermodynamics. Crucially, for systems in 'classical' states (mixtures of energy eigenstates) our protocol works on a single copy of the system. This is in sharp contrast to previous results, which showed that in case of almost-deterministic work extraction, collective actions on multiple copies are necessary to extract the free energy. This establishes the fact that free energy is a meaningful notion even for individual systems in classical states. However, for non-classical states, where coherences between energy levels exist, we prove that collective actions are necessary, so long as no external sources of coherence are used.

Paul Skrzypczyk; Anthony J. Short; Sandu Popescu

2013-02-12T23:59:59.000Z

377

Quick setup of unit test for accelerator controls system  

SciTech Connect

Testing a single hardware unit of an accelerator control system often requires the setup of a program with graphical user interface. Developing a dedicated application for a specific hardware unit test could be time consuming and the application may become obsolete after the unit tests. This paper documents a methodology for quick design and setup of an interface focused on performing unit tests of accelerator equipment with minimum programming work. The method has three components. The first is a generic accelerator device object (ADO) manager which can be used to setup, store, and log testing controls parameters for any unit testing system. The second involves the design of a TAPE (Tool for Automated Procedure Execution) sequence file that specifies and implements all te testing and control logic. The sting third is the design of a PET (parameter editing tool) page that provides the unit tester with all the necessary control parameters required for testing. This approach has been used for testing the horizontal plane of the Stochastic Cooling Motion Control System at RHIC.

Fu, W.; D'Ottavio, T.; Gassner, D.; Nemesure, S.; Morris, J.

2011-03-28T23:59:59.000Z

378

Working Remotely | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Working Remotely Working Remotely Remote Access Use VPN to access Argonne resources Wake up your computer if power management policies have been applied Connect to your work computer by using Remote Desktop Communications Log into web-based e-mail Outlook Zimbra Send instant messages with Jabber Use Argonne's voice mail and teleconferencing services Use Adobe Connect for web conferencing E-Mail Client and Mobile Device Configuration Changes for Exchange 2010 Cyber Security Secure your home computers Passwords MyPassword Change your password Choosing a good password Other Tools Upload a file for retrieval by others (login required) Argonne SharePoint Server (login required) Inside Argonne (accessible onsite or through VPN) Focal Point Management Blog (accessible onsite or through VPN)

379

Energy Work | Open Energy Information  

Open Energy Info (EERE)

Work Work Jump to: navigation, search Name Energy Work Place Kelaniya, Sri Lanka Sector Biomass, Renewable Energy, Solar Product Dealing with renewable energy applications, specifically solar and biomass power generation Coordinates 6.95°, 79.916702° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":6.95,"lon":79.916702,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

380

CFN Ops Plan | Work Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Perma Works | Open Energy Information  

Open Energy Info (EERE)

Perma Works Perma Works Jump to: navigation, search Name Perma Works Place Albuquerque, New Mexico Zip 87123 Sector Geothermal energy Product A company that focuses on producing enhanced geothermal systems through providing electronics and software. Coordinates 35.08418°, -106.648639° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.08418,"lon":-106.648639,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

382

CFCC working group meeting: Proceedings  

SciTech Connect

This report is a compilation of the vugraphs presented at this meeting. Presentations covered are: CFCC Working Group; Overview of study on applications for advanced ceramics in industries for the future; Design codes and data bases: The CFCC program and its involvement in ASTM, ISO, ASME, and military handbook 17 activities; CFCC Working Group meeting (McDermott Technology); CFCC Working Group meeting (Textron); CFCC program for DMO materials; Developments in PIP-derived CFCCs; Toughened Silcomp (SiC-Si) composites for gas turbine engine applications; CFCC program for CVI materials; Self-lubricating CFCCs for diesel engine applications; Overview of the CFCC program`s supporting technologies task; Life prediction methodologies for CFCC components; Environmental testing of CFCCs in combustion gas environments; High-temperature particle filtration ORNL/DCC CRADA; HSCT CMC combustor; and Case study -- CFCC shroud for industrial gas turbines.

NONE

1997-12-31T23:59:59.000Z

383

Surveillance Guides - Work Control Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Control Process Work Control Process 1.0 Objective The objective of this surveillance guide is to provide lines of inquiry for evaluating the effectiveness of the contractor's work control process. Users should be cognizant that the lines of inquiry need to be further tailored to fit specific facilities or activities in accordance with contractual mechanisms such as Maintenance Implementation Plans, Conduct of Operations Implementation Plans, and the Integrated Safety Management System Description. 2.0 References 2.1 DOE 4330.4B Maintenance Management Program 2.2 48 CFR 1970.5204-2 Department of Energy Acquisition Regulations 2.3 DOE O 5480.19, Conduct of Operations 2.4 10 CFR 830.120, Quality Assurance 3.0 Requirements Implemented This surveillance is conducted to verify implementation of Core

384

Work Practices for Chemical Fumehoods  

NLE Websites -- All DOE Office Websites (Extended Search)

Practices for Chemical Fumehoods Practices for Chemical Fumehoods (Reviewed May 16, 2011) Always use a chemical fumehood when working with toxic and/or volatile chemicals, not on an open bench. Chemical fumehoods are designed to provide protection for the user from chemical and radiological contaminants. However, they do not absolutely eliminate exposure, even under ideal conditions. Careless work practices can result in considerable exposure to users who may believe they are protected. To optimize the performance of the chemical hood, adhere to the following work practices: 1. Ensure that your chemical hood has a current inspection sticker (dated within the last year). The face velocity should be between 80 and 120 linear feet per minute (lfpm). 2. Verify that the chemical hood is drawing air.

385

Objects as Communicating Prolog Units  

Science Conference Proceedings (OSTI)

The aim of this paper is to present a set of extensions to the Prolog language in order to insert in it concepts typical of parallel, distributed object-oriented systems. A program is a collection of objects (P-Units) that represent chunks of knowledge ...

Paola Mello; Antonio Natali

1987-06-01T23:59:59.000Z

386

Reduction in Unit Steam Production  

E-Print Network (OSTI)

In 2001 the company's Arch-Brandenburg facility faced increased steam costs due to high natural gas prices and decreased production due to shutdown of a process. The facility was challenged to reduce unit steam consumption to minimize the effects of thes

Gombos, R.

2004-01-01T23:59:59.000Z

387

Unit Testing of Z Specifications  

Science Conference Proceedings (OSTI)

We propose a simple framework for validation unit testing of Z specifications, and illustrate this framework by testing the first few levels of a POSIX specification. The tests are written in standard Z, and are executable by the CZT animator, ZLive.

Mark Utting; Petra Malik

2008-09-01T23:59:59.000Z

388

Training Work Group Charter | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Charter Training Work Group Charter The Training Work Group fosters improvements in the quality, efficacy, and delivery of DOE safety training, and realizes...

389

NREL: Transmission Grid Integration - Working With Us  

NLE Websites -- All DOE Office Websites (Extended Search)

Working With Us NREL works with industry, government, and academia on transmission integration research. Learn how you can work with us. Develop Technology Partnerships There are a...

390

Undergraduate Program Time Limits and Work Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive...

391

Derivative Works | Scientific and Technical Information Program  

Office of Scientific and Technical Information (OSTI)

works are those based on one or more already existing works, This includes any work in which the editorial revisions, annotations, elaborations, or other modifications,...

392

Categorical Exclusion for Maintenance Work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

393

FINAL Announcement International Brainstorming Work-  

E-Print Network (OSTI)

, though in an energy in-efficient way. Organic MSW is identified as one of the potential sources of biomass energy. Biomass is a renewable resource that has a steady and abundant supply, especially thoseFINAL Announcement 1st International Brainstorming Work- shop on Waste to Energy in India Organized

Hone, James

394

Field Guide: Live Working Rope  

Science Conference Proceedings (OSTI)

Ropes are an essential tool in many applications associated with the electric power industry. Ropes used in proximity to or in contact with high-voltage power lines require demanding dielectric properties as well as strength and durability. A comprehensive understanding of live working rope use is necessary for safe and efficient operations wherever such ropes are used.

2009-03-31T23:59:59.000Z

395

Available work in geothermal energy  

DOE Green Energy (OSTI)

The most important thermodynamic considerations needed for a clear understanding of the operation of geothermal installations used for the production of electricity are presented. A brief description is given of the nature of a geothermal reservoir and the characteristics of the most practical systems for the conversion of geothermal energy into work are described. The appropriate specialized forms of the First and Second Laws of Thermodynamics are derived and the related concepts of optimum available work, available work, entropy production, dissipated energy, and utilization factor are introduced. The shortcomings of the method of cycle analysis are discussed when applied to geothermal plants. Special attention is devoted to a detailed discussion of the most important general indicators that follow for the designer from a thermodynamic analysis. Various methods of graphically interpreting the concept of available work are described in detail and the importance of easily accessible, reliable formulations of the thermophysical properties of the pure substances, solutions, and mixtures that the designer needs for success are discussed. (MHR)

Kestin, J.

1978-07-01T23:59:59.000Z

396

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

A weekly e-newsletter for the Waste Isolation Pilot Plant team September 18, 2003 The Big Story Characterization Operations completed at ANL-E Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-18-03 at 7:17 a.m.) 21 Shipments scheduled to arrive at WIPP this week 2,020 Total shipments received at WIPP Months of dedication and teamwork have paid off for WIPP Central Characterization Project (CCP) employees working at Argonne National Laboratory - East (ANL-E). Characterization activities at the site have

397

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

| NRC Officials Visit WIPP Tod | NRC Officials Visit WIPP Tod A weekly e-newsletter for the Waste Isolation Pilot Plant team September 25, 2003 The Big Story Recertification - a work in progress Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-25-03 at 7:16 a.m.) 21 Shipments scheduled to arrive at WIPP this week 2,044 Total shipments received at WIPP Without EPA approval, WIPP could not have received the first waste shipment in 1999. In 1998, EPA cleared the way for TRU waste disposal when it certified that the WIPP repository would safely contain

398

Non-Unit Faculty Effective Date  

E-Print Network (OSTI)

SUBJECT: Non-Unit Faculty Evaluation Effective Date: 05-18-11 Policy Number: 4-500.1 Supersedes: 4 Adoption: 03-30-05 APPLICABILITY/ACCOUNTABILITY: This policy is applicable to all units and departments that employ non-unit faculty employees in regular positions. POLICY STATEMENT: Non-unit faculty members

Glebov, Leon

399

The United States Government Configuration Baseline ...  

Science Conference Proceedings (OSTI)

... ITL). The United States Government Configuration Baseline (USGCB) - Windows Vista Firewall Content. Warning Notice. ...

2013-08-02T23:59:59.000Z

400

The United States Government Configuration Baseline ...  

Science Conference Proceedings (OSTI)

... Laboratory (ITL). The United States Government Configuration Baseline (USGCB) - Windows 7 Content. Warning Notice. Do ...

2013-08-02T23:59:59.000Z

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

United States 1995 Vintage Oil Well History  

U.S. Energy Information Administration (EIA)

United States 1995 Vintage Oil Well History. Energy Information Administration (U.S. Dept. of Energy)

402

1997 Housing Characteristics Tables Housing Unit Tables  

U.S. Energy Information Administration (EIA) Indexed Site

Million U.S. Households; 45 pages, 128 kb) Million U.S. Households; 45 pages, 128 kb) Contents Pages HC1-1a. Housing Unit Characteristics by Climate Zone, Million U.S. Households, 1997 4 HC1-2a. Housing Unit Characteristics by Year of Construction, Million U.S. Households, 1997 4 HC1-3a. Housing Unit Characteristics by Household Income, Million U.S. Households, 1997 4 HC1-4a. Housing Unit Characteristics by Type of Housing Unit, Million U.S. Households, 1997 3 HC1-5a. Housing Unit Characteristics by Type of Owner-Occupied Housing Unit, Million U.S. Households, 1997 3 HC1-6a. Housing Unit Characteristics by Type of Rented Housing Unit, Million U.S. Households, 1997 3 HC1-7a. Housing Unit Characteristics by Four Most Populated States, Million U.S. Households, 1997 4

403

Assessment of Offshore Wind Energy Resources for the United States  

Wind Powering America (EERE)

Technical Report Technical Report NREL/TP-500-45889 June 2010 Assessment of Offshore Wind Energy Resources for the United States Marc Schwartz, Donna Heimiller, Steve Haymes, and Walt Musial National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-500-45889 June 2010 Assessment of Offshore Wind Energy Resources for the United States Marc Schwartz, Donna Heimiller, Steve Haymes, and Walt Musial Prepared under Task No. WE10.1211 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

404

Mechanical Working Group meeting minutes  

DOE Green Energy (OSTI)

This documents contains the minutes and viewgraphs from the October 27--28, 1992 meeting on the subject of power generation and delivery systems for military applications. Attendees represented the US Air Force and NASA. The thermal management panel reported on the capillary pump loop test facility, thermal control systems and compressors, and the oxygen heat pipe flight experiment. The aerospace power panel reported on the integrated power unit for the more electric airplane, the solar dynamic power system, the modular high temperature gas cooled reactor-gas-turbine program, the multi-megawatt CBC power system, and analytical modeling for heat pipe performance. The terrestrial power panel reported on a free piston stirling engine power generation system, fuel cell vehicles, and the advanced gas turbine project.

Not Available

1992-12-01T23:59:59.000Z

405

United Illuminating | Open Energy Information  

Open Energy Info (EERE)

Illuminating Illuminating Jump to: navigation, search Logo: United Illuminating Name United Illuminating Address 157 Church St Place New Haven, Connecticut Zip 06510 Sector Services Product Green Power Marketer Website http://www.uinet.com/ Coordinates 41.3073289°, -72.9247896° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.3073289,"lon":-72.9247896,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

406

United Nations | Open Energy Information  

Open Energy Info (EERE)

Nations Nations Jump to: navigation, search Logo: United Nations Name United Nations Address UN Headquarters 1st Ave & 46th Street Place New York, NY Zip 10017 Region Northeast - NY NJ CT PA Area Year founded 1945 Website http://www.un.org/ Coordinates 40.7143528°, -74.0059731° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7143528,"lon":-74.0059731,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

407

United States | OpenEI  

Open Energy Info (EERE)

States States Dataset Summary Description No description given. Source National Renewable Energy Laboratory Date Released July 03rd, 2012 (2 years ago) Date Updated July 03rd, 2012 (2 years ago) Keywords biopower csp geothermal hydropower hydrothermal Renewable Energy Technical Potential rooftop United States utility-scale wind Data text/csv icon United States Renewable Energy Technical Potential (csv, 7.7 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL) Comment Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote

408

Second United Nations International Conference  

Office of Scientific and Technical Information (OSTI)

Second United Nations Second United Nations International Conference on the Peaceful Uses of Atomic Energy ON THE ANALYSIS O F BUBBLE CHAMBER TRACKS Q Hugh Bradner and F r a n k Solmitz INTRODUCTION A j , L. - i Since i t s iyvention by Glaser in 1953, the bubble chamber has become a m o s t valuable tool $high-energy physics. It combines a number of advan- tages of various older methods of particle detection: resolution, rapid accumulation of data, some time resolution, and some choice of the nucleus whose interaction one wants to study (bubble chambers have been -'made to operate with a large number of different liquids, including Hz, D2, He, Xe, and s e v e r a l hydrocarbons). resolution and rapid data accumulation, high- speed high-precision analysis procedures m u s t be developed.

409

Will our nuclear weapons work?  

NLE Websites -- All DOE Office Websites (Extended Search)

Will our nuclear weapons work? Will our nuclear weapons work? National Security Science magazine Latest Issue:April 2013 All Issues » submit Supercomputers are essential for assessing the health of the U.S. nuclear stockpile Supercomputers provide assurance by simulating nuclear weapons performance March 25, 2013 Graphic of a missile being tested through computer simulation Los Alamos uses supercomputers to make high-resolution 3D simulations that help to assess the health of nuclear weapons like this B-61 bomb. Contact Managing Editor Clay Dillingham Email The nuclear weapons in the U.S. stockpile were designed and built to be replaced with new designs and builds every 10 to 15 years. These weapons have lived beyond their expected lifespans. Supercomputers provide the high-resolution 3D simulations needed for

410

Substances of Abuse and Work  

NLE Websites -- All DOE Office Websites (Extended Search)

SUBSTANCES OF ABUSE SUBSTANCES OF ABUSE AND WORK Mary L. Doyle, MPH, RN, COHN-5/CM DOE Headquarters January 16, 2002 Americans 12 Years and Older Using Dru s or Alcohol in the Past Month 1915 1995 1999 Substance Abuse in Industry * Drug use - associated with higher rates of )>absenteeism )>injury l> medical care utilization )> involuntary separation l> health care costs * Alcohol use in the workplace associated with l> absenteeism l> performance on specific tasks ::... mixed data on other outcomes Americans Over 12 Years Reporting Lifetime (Ever Used) Drug Use "'.11---------11--------l * Aloobol *Airf.Udruc 50.11---------11--------l * Mari- ODd ........ 40.11---------11----&.---l * Cocaiae *llalaciaogoal * Horoia Substance Abuse and Work

411

Working at ORNL | Careers | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

View Open Positions View Open Positions View Postdoctoral Positions Create A Profile Internal applicants please apply here View or update your current application or profile. External applicants Internal applicants Internet Explorer Browser preferred for ORNL applicants. Chrome is not currently supported. For more information about browser compatibility please refer to the FAQs. If you have difficulty using the online application system or need an accommodation to apply due to a disability, please email ORNLRecruiting@ornl.gov or phone 1-866-963-9545 Careers Home | ORNL | Careers | Working at ORNL SHARE Working at ORNL Community and Culture Here at Oak Ridge National Lab we have over 4,000 employees representing more than 80 different countries. Our employees make a difference in the

412

Visualization and Modeling Working Group  

Science Conference Proceedings (OSTI)

During the 2005 Hurricane season, many consequence predictions were available from 36 to 96 hours before landfalls, via the Department of Energy’s Visualization and Modeling Working Group (VMWG). Real-time data can be tapped by local officials and utilities, and can also be accessed for post-event regulatory audits. An overview of VMWG’s models, results and uses will be presented.

Fernandez, S.J. (LANL); Dodrill, K.A.

2007-03-01T23:59:59.000Z

413

Robotic Technologies for Live Working  

Science Conference Proceedings (OSTI)

This project investigated the feasibility of developing a robotic device for removing and inserting the cotter key on a suspension or deadend insulator string8212the Cotter Key Remover-Installer and Camera (CKRIC). Researchers reviewed EPRI report 1019962, Robotic Technologies for Life Working (2010), and requested input and photographs of insulator strings from project funders. They then prepared animation sequences to study needed motions and degrees of freedom of the device, erected insulator strings ...

2011-12-16T23:59:59.000Z

414

Report on all ARRA Funded Technical Work  

DOE Green Energy (OSTI)

The main focus of this American Recovery and Reinvestment Act of 2009 (ARRA) funded project was to design an energy efficient carbon capture and storage (CCS) process using the Recipient?s membrane system for H{sub 2} separation and CO{sub 2} capture. In the ARRA-funded project, the Recipient accelerated development and scale-up of ongoing hydrogen membrane technology research and development (R&D). Specifically, this project focused on accelerating the current R&D work scope of the base program-funded project, involving lab scale tests, detail design of a 250 lb/day H{sub 2} process development unit (PDU), and scale-up of membrane tube and coating manufacturing. This project scope included the site selection and a Front End Engineering Design (FEED) study of a nominally 4 to 10 ton-per-day (TPD) Pre-Commercial Module (PCM) hydrogen separation membrane system. Process models and techno-economic analysis were updated to include studies on integration of this technology into an Integrated Gasification Combined Cycle (IGCC) power generation system with CCS.

None

2013-10-05T23:59:59.000Z

415

United States National Seismographic Network  

SciTech Connect

The concept of a United States National Seismograph Network (USNSN) dates back nearly 30 years. The idea was revived several times over the decades. but never funded. For, example, a national network was proposed and discussed at great length in the so called Bolt Report (U. S. Earthquake Observatories: Recommendations for a New National Network, National Academy Press, Washington, D.C., 1980, 122 pp). From the beginning, a national network was viewed as augmenting and complementing the relatively dense, predominantly short-period vertical coverage of selected areas provided by the Regional Seismograph Networks (RSN`s) with a sparse, well-distributed network of three-component, observatory quality, permanent stations. The opportunity finally to begin developing a national network arose in 1986 with discussions between the US Geological Survey (USGS) and the Nuclear Regulatory Commission (NRC). Under the agreement signed in 1987, the NRC has provided $5 M in new funding for capital equipment (over the period 1987-1992) and the USGS has provided personnel and facilities to develop. deploy, and operate the network. Because the NRC funding was earmarked for the eastern United States, new USNSN station deployments are mostly east of 105{degree}W longitude while the network in the western United States is mostly made up of cooperating stations (stations meeting USNSN design goals, but deployed and operated by other institutions which provide a logical extension to the USNSN).

Buland, R. [Geological Survey, Denver, CO (United States)

1993-09-01T23:59:59.000Z

416

U.S.-Vietnam Climate Change Working Group | Open Energy Information  

Open Energy Info (EERE)

Vietnam Climate Change Working Group Vietnam Climate Change Working Group Jump to: navigation, search Name U.S.-Vietnam Climate Change Working Group Agency/Company /Organization United States Geological Survey, Government of Vietnam Sector Energy, Land Topics Policies/deployment programs, Background analysis Website http://www.pwrc.usgs.gov/CCWG/ Program Start 2008 Country United States, Vietnam UN Region South-Eastern Asia, Northern America References U.S.-Vietnam Climate Change Working Group[1] "The U.S.-Vietnam Climate Change Working Group (CCWG) met in Hanoi from 31 March to 2 April 2010 and developed a program of cooperative work and projects. Priorities for cooperation included: I. To establish benchmark Surface Elevation Table (SET) devices on the Vietnam coast to measure coastal elevation change, the first step in

417

LETTER Communicated by Emilio Salinas Assessing Neuronal Coherence with Single-Unit, Multi-Unit,  

E-Print Network (OSTI)

LETTER Communicated by Emilio Salinas Assessing Neuronal Coherence with Single-Unit, Multi-Unit the correlated input and multi-unit activity increases proportionally with the square root of the number of neurons in the multi-unit recording. The coherence between two typical multi-unit recordings (2 to 10

Gielen, C.C.A.M.

418

Historical Information on the Transportation External Coordination Working  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Historical Information on the Transportation External Coordination Historical Information on the Transportation External Coordination Working Group (TEC) Historical Information on the Transportation External Coordination Working Group (TEC) Historical Information on the Transportation External Coordination Working Group (TEC) TEC was formed in 1992 to improve coordination between the U.S. Department of Energy (DOE) and external groups interested in the Department's transportation activities. TEC was co-chaired by DOE's Office of Civilian Radioactive Waste Management and the Office of Environmental Management. Going the Distance "Going the Distance? The Safe Transport of Spent Nuclear Fuel and High-Level Radioactive Waste in the United States" available for free download from the National Academic Press Resources

419

Climate VISION: Private Sector Initiatives: Automobile Manufacturers: Work  

Office of Scientific and Technical Information (OSTI)

Work Plans Work Plans The Alliance of Automobile Manufacturers (Alliance) is a trade association of ten car and light truck manufacturers that account for more than 90 percent of U.S. vehicle sales. Member companies, which include BMW Group, DaimlerChrysler, Ford Motor Company, General Motors, Mazda, Mitsubishi Motors, Nissan, Porsche, Toyota, and Volkswagen, employ about 620,000 people in the United States in 35 states. Read the Alliance Work Plan (PDF 254 KB) Example 2-1: GM - Lighting efficiency plan to implement "green lights" projects at 73 plants (PDF 113 KB) Example 2-2: Ford - Plant-wide assessment to identify opportunities to reduce energy use (PDF 83 KB) Example 2-3: GM - Plant-wide audit to reduce energy use at Janesville truck plant (PDF 105 KB)

420

Port Angeles Public Works and Utilities - Commercial and Industrial Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Port Angeles Public Works and Utilities - Commercial and Industrial Port Angeles Public Works and Utilities - Commercial and Industrial Energy Efficiency Rebate Program Port Angeles Public Works and Utilities - Commercial and Industrial Energy Efficiency Rebate Program < Back Eligibility Commercial Industrial Savings Category Home Weatherization Commercial Weatherization Appliances & Electronics Other Commercial Lighting Lighting Water Heating Maximum Rebate All Lighting: up to 70% of project cost All Custom: up to 70% of incremental energy project costs Program Info State District of Columbia Program Type Utility Rebate Program Rebate Amount Improvement to Existing Lighting System: $10 - $400/fixture Improvement to Existing Lighting Controls: $35 - $60/unit New Construction Lighting: $10 - $50 New Construction Energy Smart Design Office: $0.25 - $0.50 sq/ft

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Annual housing survey: 1979. United States and regions. part f: energy-related housing characteristics  

Science Conference Proceedings (OSTI)

This report presents statistics on energy - related housing characteristics from the 1979 Annual Housing Survey for the United States by inside and outside standard metropolitan statistical areas (SMSA's) and each of the four geographic regions. The statistics are based on information from a sample of housing units. The information was collected by personal interview from September 1979 to December 1979. For the United States as a whole and for the separate regions (North Central, Northeast, South, and West), data are presented on fuel, fuel cost, heating, air conditioning, insulation, and transportation characteristics in relation to the following information: income of families and primary individuals, value of owner - occupied housing units, gross rent of renter - occupied housing units, housing units in structure, number of rooms per housing unit, year structure built, monthly cost paid for electricity, and others. Also shown are the yearly cost paid for fuel oil, coal, etc. and household head's principal means of transportation to work, by distance and travel time to work in 1979. Data are classified according to all races, black - housing units with black household head, and Spanish - housing units with household head of Spanish origin. Maps and a table - finding guide are provided. Appendices describe the geographic area classifications; define subjects covered in the report; and present information on sample design, estimation, and data accuracy.

Not Available

1982-03-01T23:59:59.000Z

422

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

2 Appliances in U.S. Homes, by Owner/Renter Status, 2009" 2 Appliances in U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,"Total U.S.1 (millions)",,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" "Appliances",,"Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent" "Total Homes",113.6,76.5,37.1,63.2,8.6,3.9,2.8,1.5,7.6,2.3,16.8,5.5,1.4 "Cooking Appliances" "Stoves (Units With Both"

423

Transportation External Coordination Working Group:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accomplishments and Future Accomplishments and Future Transportation External Coordination Working Group Meeting Phoenix, AZ Judith A. Holm, Office of National Transportation Office of Civilian Radioactive Waste Management April 4, 2005 TEC MEMBER ORGANIZATIONS American College of Emergency Physicians (ACEP) American Nuclear Society (ANS) Association of American Railroads (AAR) Brotherhood of Locomotive Engineers and Trainmen (BLET) Commercial Vehicle Safety Alliance (CVSA) Conference of Radiation Control Program Directors, Inc. (CRCPD) Council of Energy Resource Tribes (CERT) Council of State Governments-Eastern Regional Conference (CSG-ERC) Council of State Governments-Midwestern Office (CSG-MW) Council on Radionuclides and Radiopharmaceuticals (CORAR) Dangerous Goods Advisory Council (DGAC)

424

Transportation External Coordination Working Group:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Study of Study of DOE FY03 SNF Shipments Judith Holm National Transportation Program Albuquerque, New Mexico April 21, 2004 Background Benchmarking * The goal of benchmarking is to identify, understand, and adapt outstanding practices from organizations anywhere in the world to help your organization improve its performance * Benchmarking looks outward to find best practice and high performance and then measures actual business operations against those goals Background Best Practices * Best practices are proven solutions that represent superior performance when adapted and implemented in one's own organization. This includes processes and procedures that others are using to transport radioactive materials Background Lessons Learned * Lessons learned are "good work practices" or

425

Transportation External Coordination Working Group:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

External Coordination External Coordination Working Group: Background and Process Judith Holm National Transportation Program Albuquerque, New Mexico April 21, 2004 TEC History * DOE's Office of Environmental Management (EM) and Office of Civilian Radioactive Waste Management (OCRWM) formed TEC in 1992 * EM & RW developed MOU and TEC charter in 1992 - Other DOE program offices joined in 1993-94 * Other agencies (DOT, FRA, NRC, EPA) have been active participants Meeting Locations 1992-present Some Founding Principles * TEC concept centered on unique stakeholder accountability principles - Participation by key responsible parties in technical/policy issue discussion and resolution results in increased confidence and more efficient business decisions * Ultimate goal: develop multi-year set of

426

QuarkNet at Work  

NLE Websites -- All DOE Office Websites (Extended Search)

QuarkNet at Work Information for Active Mentors & Teachers     QuarkNet Home - Information - Calendar - Contacts - Projects - Forms: EoI - Teachers Information Active Centers Calendar Contacts Expectations: for Teachers, for Mentors Information on Other Funding Sources Program Overview Support: for Teachers, for Centers Staff Job Description Activities Essential Practices - Teaching with Inquiry (word.doc) Classroom Activities e-Labs: CMS - Cosmic Ray Boot Camp Project Activities Databases: Data Entry (password only) 2012 Center Reporting Resources Important Findings from Previous Years Mentor Tips Associate Teacher Institute Toolkit Print Bibliography - Online Resources Imaging Detector Principles of Professionalism for Science Educators - NSTA position

427

Working group 1: Coronal streamers  

SciTech Connect

The working group on colonel streamers convened on the first day of the 2nd SOHO Workshop, which took place in Marciana Marina, Isola d`Elba, 27 September--1 October 1993. Recent progress in streamer observational techniques and theoretical modeling was reported. The contribution of streamers to the mass and energy supply for the solar wind was discussed. Moreover, the importance of thin electric current sheets for determining both the gross dynamical properties of streamers and the fine-scale filamentary structure within streamers, was strongly emphasized. Potential advances to our understanding of these areas of colonel physics that could be made by the contingent of instruments aboard SOHO were pointed out.

Kopp, R.A.

1994-04-01T23:59:59.000Z

428

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

16/03 16/03 | Shipments expected this week: ANL-E (2) , RFETS (11), SRS (6) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 16, 2003 The Big Story EM-6 to review WIPP baseline Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 10/16/03 at 7:05 a.m.) Shipments scheduled to arrive at WIPP this week 19 Total shipments received at WIPP 2,095 A team from the DOE Office of Project Management, EM-6, will be on site next week to review the WIPP baseline and the integration of that baseline with the National TRU

429

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

3/03 3/03 | Shipments expected this week: RFETS (11), SRS (4), Hanford (2) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 23, 2003 Sealed sources: questions and answers Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 10/23/03 at 7:06 a.m.) Shipments scheduled to arrive at WIPP this week 17 Total shipments received at WIPP 2,115 Sealed sources have been a topic of discussion lately. Here are answers to some of the questions raised by this topic:

430

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

Thursday, 9/11/03 | Total shipments received at WIPP: 2003 | Shipments expected this Thursday, 9/11/03 | Total shipments received at WIPP: 2003 | Shipments expected this A weekly e-newsletter for the Waste Isolation Pilot Plant team September 11, 2003 The Big Story 2003 in 2003 Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 9-11-03 at 10 a.m.) 21 Shipments scheduled to arrive at WIPP this week 2,003 Total shipments received at WIPP The 2003 rd waste shipment arrived at the WIPP site today (Thursday, September 11) from Hanford. It is highly fitting that

431

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

9/04 9/04 Shipments expected this week: NTS (2), RFETS (13), SRS (6) January 29, 2004 The Big Story WTS restructures workforce Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 1/29/04 at 7:14 a.m.) Shipments scheduled to arrive at WIPP this week 21 Total shipments received at WIPP 2,309 Earlier this week WTS, the management and operating contractor at WIPP, announced a workforce restructuring plan to meet the current and future operational needs of the WIPP facility. It is anticipated

432

file://\\Bellview\TeamWorks\TRUTeamWorks.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

Total shipments received at WIPP as of 8-25-03: 1,956 | Shipments expected this week: Hanford Total shipments received at WIPP as of 8-25-03: 1,956 | Shipments expected this week: Hanford A weekly e-newsletter for the Waste Isolation Pilot Plant team August 25, 2003 The Big Story INEEL drum fire and Senate Bill S. 1424: questions and answers Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e -mail. WIPP Shipments (as of 8-25-03) 19 Shipments scheduled to arrive at WIPP this week 1,956 Total shipments received at WIPP Some recent media coverage has created some confusion in the public about the

433

How the Artificial Retina Works  

NLE Websites -- All DOE Office Websites (Extended Search)

the Artificial Retina Works the Artificial Retina Works Artificial Retina Diagram Normal vision begins when light enters and moves through the eye to strike specialized photoreceptor (light-receiving) cells in the retina called rods and cones. These cells convert light signals to electric impulses that are sent to the optic nerve and the brain. Retinal diseases like age-related macular degeneration and retinitis pigmentosa destroy vision by annihilating these cells. With the artificial retina device, a miniature camera mounted in eyeglasses captures images and wirelessly sends the information to a microprocessor (worn on a belt) that converts the data to an electronic signal and transmits it to a receiver on the eye. The receiver sends the signals through a tiny, thin cable to the microelectrode array, stimulating it to emit pulses. The artificial retina device thus bypasses defunct photoreceptor cells and transmits electrical signals directly to the retina's remaining viable cells. The pulses travel to the optic nerve and, ultimately, to the brain, which perceives patterns of light and dark spots corresponding to the electrodes stimulated. Patients learn to interpret these visual patterns.

434

Electrochromic Glazings: How they Work  

NLE Websites -- All DOE Office Websites (Extended Search)

How they Work How they Work Electrochromic glazings have great potential to improve the energy efficiency and occupant comfort afforded by architectural windows. These smart windows can dynamically control light transmission by windows in buildings, automobiles, and aircraft. Electrochromic glazings are the most significant members of a family of chromogenic light-control technologies that includes large-area dispersed liquid crystals, dispersed particle windows, and photochromic and thermochromic materials. Electrochromic devices represent the most versatile window technology of this type, exhibiting the best combination of switching properties for chromogenic window applications. Electrochromic glazings typically have a change in visible light transmission from 10% to 70%, moderately fast switching times, and low dc power consumption. These glazings have memory, so they only need power to make a change in transmission. Electrochromic technology can be coupled with smart control systems to give constant lighting levels, blending artificial lighting with daylighting for improved building energy efficiency. Energy simulations of office buildings indicate that smart windows with lighting controls in arid climates can provide 30-40% energy savings over conventional windows. Savings are realized in cooling, lighting, and peak utility electric loads. Other benefits include smaller heating, ventilating, and air-conditioning (HVAC) systems and greater thermal and visual comfort.

435

UNITED STATES DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 UNITED STATES DEPARTMENT OF ENERGY 2012 CONGESTION STUDY COMMENTS OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION I. Introduction. The Pennsylvania Public Utility Commission ("PAPUC" or "Commission") herein files its comments to the U.S. Department of Energy ("DOE") Federal Register Notice published on November 10, 2011 (76 FR 70122) soliciting comments in preparation for the 2012 DOE Congestion Study. The Energy Policy Act of 2005 ("EPAct of 2005") directed that DOE perform a triennial study, in consultation with states, of electric transmission congestion on the national grid. After receipt and consideration of

436

United States Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Office of Hearings and Appeals In the Matter of: ) ) Philips Lighting Company; ) Case Nos.: EXC-12-0001 GE Lighting; and ) EXC-12-0002 OSRAM SYLVANIA, Inc. ) EXC-12-0003 ) Filing Date: February 22, 2012 ) ____________________________________) Issued: April 16, 2012 _____________________ Decision and Order ______________________ This Decision and Order considers Applications for Exception filed by Philips Lighting Company (Philips), GE Lighting (GE) and OSRAM SYLVANIA, Inc. (OSI) (collectively, "the Applicants"), seeking exception relief from the applicable provisions of 10 C.F.R. Part 430, pertaining to Energy Conservation Program: Energy Conservation Standards and Test

437

Commandant United States Coast Guard  

E-Print Network (OSTI)

1. PURPOSE. This Manual prescribes policies and procedures for administering the Coast Guard Records, Forms and Reports Programs as they relate to the lifecycle management of both paper and electronic documents/data. This expanded Manual combines key parameters of Information Management Programs into one document for the convenience of the user. 2. ACTION. Area and district commanders, commanders maintenance and logistics commands, commanding officers of headquarters units, assistant commandants for directorates, Chief Counsel and special staff offices at Headquarters shall ensure compliance with the provisions of this Manual. Internet release authorized.

unknown authors

2004-01-01T23:59:59.000Z

438

Compact monolithic capacitive discharge unit  

DOE Patents (OSTI)

A compact monolithic capacitive discharge unit (CDU) is disclosed in which a thyristor switch and a flyback charging circuit are both sandwiched about a ceramic energy storage capacitor. The result is a compact rugged assembly which provides a low-inductance current discharge path. The flyback charging circuit preferably includes a low-temperature co-fired ceramic transformer. The CDU can further include one or more ceramic substrates for enclosing the thyristor switch and for holding various passive components used in the flyback charging circuit. A load such as a detonator can also be attached directly to the CDU.

Roesler, Alexander W. (Tijeras, NM); Vernon, George E. (Rio Rancho, NM); Hoke, Darren A. (Albuquerque, NM); De Marquis, Virginia K. (Tijeras, NM); Harris, Steven M. (Albuquerque, NM)

2007-06-26T23:59:59.000Z

439

Definition: British thermal unit | Open Energy Information  

Open Energy Info (EERE)

thermal unit thermal unit Jump to: navigation, search Dictionary.png British thermal unit The amount of heat required to raise the temperature of one pound of water one degree Fahrenheit; often used as a unit of measure for the energy content of fuels.[1][2] View on Wikipedia Wikipedia Definition The British thermal unit (BTU or Btu) is a traditional unit of energy equal to about 1055 joules. It is the amount of energy needed to cool or heat one pound of water by one degree Fahrenheit. In scientific contexts the BTU has largely been replaced by the SI unit of energy, the joule. The unit is most often used as a measure of power (as BTU/h) in the power, steam generation, heating, and air conditioning industries, and also as a measure of agricultural energy production (BTU/kg). It is still used

440

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

Appliances in U.S. Homes, by Housing Unit Type, 2009" Appliances in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,,,,,"5 or More Units","Mobile Homes" "Appliances",,"Detached","Attached","2 to 4 Units" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Cooking Appliances" "Stoves (Units With Both" "an Oven and a Cooktop)" "Use a Stove",102.3,62.3,6.4,8.7,18.3,6.5 "1.",100.8,61,6.4,8.6,18.3,6.5 "2 or More",1.5,1.3,0.1,"Q","Q","Q" "Do Not Use a Stove",11.3,9.5,0.3,0.3,0.8,0.4

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

"Table HC14.3 Household Characteristics by West Census Region, 2005" " Million U.S. Housing Units" ,,"West Census Region" ,"U.S. Housing Units (millions)" ,,,"Census Division"...

442

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

"Table HC10.3 Household Characteristics by U.S. Census Region, 2005" " Million U.S. Housing Units" ,"Housing Units (millions)","U.S. Census Region" "Household Characteristics",,"No...

443

For the B-Area Operable Unit  

NLE Websites -- All DOE Office Websites (Extended Search)

3 April 16, 2013 Notice of Availability Record of Decision For the B-Area Operable Unit The Record of Decision (ROD) Remedial Alternative Selection for the B-Area Operable Unit...

444

Unit Energy Europe AG | Open Energy Information  

Open Energy Info (EERE)

search Name Unit Energy Europe AG Place Bad Homburg v.d.H., Hessen, Germany Sector Hydro, Wind energy Product Unit Energy develops and operates wind parks and hydroelectric...

445

Exascale Hardware Architectures Working Group  

Science Conference Proceedings (OSTI)

The ASC Exascale Hardware Architecture working group is challenged to provide input on the following areas impacting the future use and usability of potential exascale computer systems: processor, memory, and interconnect architectures, as well as the power and resilience of these systems. Going forward, there are many challenging issues that will need to be addressed. First, power constraints in processor technologies will lead to steady increases in parallelism within a socket. Additionally, all cores may not be fully independent nor fully general purpose. Second, there is a clear trend toward less balanced machines, in terms of compute capability compared to memory and interconnect performance. In order to mitigate the memory issues, memory technologies will introduce 3D stacking, eventually moving on-socket and likely on-die, providing greatly increased bandwidth but unfortunately also likely providing smaller memory capacity per core. Off-socket memory, possibly in the form of non-volatile memory, will create a complex memory hierarchy. Third, communication energy will dominate the energy required to compute, such that interconnect power and bandwidth will have a significant impact. All of the above changes are driven by the need for greatly increased energy efficiency, as current technology will prove unsuitable for exascale, due to unsustainable power requirements of such a system. These changes will have the most significant impact on programming models and algorithms, but they will be felt across all layers of the machine. There is clear need to engage all ASC working groups in planning for how to deal with technological changes of this magnitude. The primary function of the Hardware Architecture Working Group is to facilitate codesign with hardware vendors to ensure future exascale platforms are capable of efficiently supporting the ASC applications, which in turn need to meet the mission needs of the NNSA Stockpile Stewardship Program. This issue is relatively immediate, as there is only a small window of opportunity to influence hardware design for 2018 machines. Given the short timeline a firm co-design methodology with vendors is of prime importance.

Hemmert, S; Ang, J; Chiang, P; Carnes, B; Doerfler, D; Leininger, M; Dosanjh, S; Fields, P; Koch, K; Laros, J; Noe, J; Quinn, T; Torrellas, J; Vetter, J; Wampler, C; White, A

2011-03-15T23:59:59.000Z

446

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY  

NLE Websites -- All DOE Office Websites (Extended Search)

e'-ä\r., e'-ä\r., a"àT#j UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 6 14,15 ROSS AVENUE, SUITE 1200 DALLAS, TX 752A2-n33 JA¡t 5 20ll cERTrrmD rytAlr- RETIIRN RECETPT REOITESIEn COPY Edward Ziemianski Acting Manager U.S. Department of Energy Carlsbad Field Offïce P.O. Box 3090 Carlsbad, NM 88221 RE: United States Environmental Protection Agency (EPA) Region 6 Response to the Waste Isolation Pilot Plant OVPP) Approval Request to Use Panel 8 to Store and Land Dispose Polychlorinated Biphenyls (PCBs) at the WIPP Fasility located in Carlsbadr New Mexico DearMr. Ziemianski: After review ofthe design and proposed operation ofPanel 8, you are hereby approved to dispose of PCB wastes in Þanel 8 subject to the enclosed Conditions of Afproval. Your letter (dated October 25,2010) qéquested apprgrral to-qse

447

TWRS Systems Engineering Working Plan  

SciTech Connect

The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations.

Eiholzer, C.R.

1994-09-16T23:59:59.000Z

448

Hot-Work Tool Steels  

Science Conference Proceedings (OSTI)

Table 9   Recommended heat-treating practices for hot-work tool steels...1600 â?¦ O, A 58â??59 6F6 Not rec 845 (pack) 1550 (peak) (p) (p) 196 650â??705 (1200â??1300) (q) 925â??955 (q) 1700â??1750 (q) â?¦ O (r) (s) 6F7 845â??870 (1550â??1600) 670 1240 22 40 260â??300 730 (1350) 915 1675 â?¦ A 54â??55 6H1 Not rec 845 1550 22 (t) 40 (t) 202â??235 760â??790 (1400â??1450) 900â??940 1650â??1725 â?¦ A 48â??49 6H2...

449

FY 1996 annual work plan  

SciTech Connect

In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

1995-09-30T23:59:59.000Z

450

file://\\Bellview\TeamWorks\TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

30/03 Shipments expected this week: RFETS (11), SRS (4), Hanford (2) 30/03 Shipments expected this week: RFETS (11), SRS (4), Hanford (2) A weekly e-newsletter for the Waste Isolation Pilot Plant team October 30, 2003 ARROW-PAK Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e- mail. WIPP Shipments (as of 10/30/03 at 6:59 a.m.) Shipments scheduled to arrive at WIPP this week 17 Total shipments received at WIPP 2,129 You've heard of the TRUPACT-II, the pipe overpack, the RH-72B and even the 10- 160B. But have you heard about the ARROW-PAK? ARROW-PAK is a transportation container designed to contain and transport high-wattage TRU waste.

451

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

9/03 | Shipments expected this week: Hanford (1), RFETS (11), SRS (6) | 9/03 | Shipments expected this week: Hanford (1), RFETS (11), SRS (6) | A weekly e-newsletter for the Waste Isolation Pilot Plant team October 9, 2003 The Big Story It's a whole new "WIPP Experience" Topics Characterization News Transportation News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e- mail. WIPP Shipments (as of 10/9/03 at 7:24 a.m.) Shipments scheduled to arrive at WIPP this week 18 Total shipments received at WIPP 2,081 If you haven't been to the SWB lately, you are in for a big surprise. The lobby sports a new look these days, complete with banners and updated exhibits. And the new look isn't just

452

UNITED NATIONS BEST PRACTICES IN  

E-Print Network (OSTI)

rates of growth or change, unless otherwise stated, refer to annual compound rates. Details (Accra Accord, para. 148), this series builds on UNCTAD's advisory and research work in the area of FDI has benefited from views of current and former government officials, the domestic and foreign private

Catholic University of Chile (Universidad CatĂłlica de Chile)

453

Agriculture Work Space | Open Energy Information  

Open Energy Info (EERE)

of State for Planning, Israeli Ministry of Environment, National Development and Vision 2030, Mitigation Action Plans and Scenarios (MAPS), Union of Concerned Scientists, United...

454

Sequoia supercomputer transitions to classified work  

NLE Websites -- All DOE Office Websites (Extended Search)

which helps the United States ensure the safety, security and effectiveness of its aging nuclear weapons stockpile without the use of underground testing. The 20 petaflops...

455

Municipal Solid Waste in The United States  

E-Print Network (OSTI)

2005 Facts and Figures Municipal Solid Waste in The United States #12;United States Environmental Protection Agency Office of Solid Waste (5306P) EPA530-R-06-011 October 2006 www.epa.gov #12;MUNICIPAL SOLID WASTE IN THE UNITED STATES: 2005 FACTS AND FIGURES Table of Contents Chapter Page EXECUTIVE

Barlaz, Morton A.

456

PERMITTING LEADERSHIP IN THE UNITED STATES  

SciTech Connect

In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical assistance to evaluate DOE's cleanup plans. In addition, the PLUS program has facilitated the involvement of key regulators from host-states beyond the Southern region.

Ken Nemeth

2002-09-01T23:59:59.000Z

457

TeamWorks12-02-04  

NLE Websites -- All DOE Office Websites (Extended Search)

Team TRU Works Works TeamWorks Shipments Scheduled to arrive 120504 - 121104: 28 Hanford - 3 LLNL - 2 NTS - 2 RFETS - 16 SRS - 4 (subject to change) 3,167 total shipments...

458

Graduate Program Time Limits and Work Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive environment...

459

Phys-068 Energy, Work, and Power revised \\Ch-01 Energy  

E-Print Network (OSTI)

Energy is a very important concept both in physics and in our world at large. Energy takes various forms. A massive truck traveling along the highway at a high speed has much kinetic energy; a water reservoir just above a dam contains significant gravitational potential energy; a tank of gasoline contains significant chemical energy; radio waves emitted from a broadcast antenna contain energy stored in the electric and magnetic fields. Energy can take on many forms but it is never created or destroyed. This is one of the fundamental laws of physics. We say that energy is conserved. Various forms of energy include heat, light, radio waves, translational kinetic energy, rotational kinetic energy, gravitational potential energy, chemical energy, and electric potential energy. Even mass is a 2 form of energy as Einstein showed in his famous formula, E = mc. In this short tutorial I hope to present the basic energy concepts that you will need to consider practical problems involving building energy. This tutorial cannot hope to substitute for a physics course. 1. System of Units and Conversions In physics, work has a precise definition involving a force and distance. Scientists world wide have adapted a system of measurements called System International (SI). In this system length is measured in meters (m), mass in kilograms (kg), and time in seconds (s). The subset of the SI units which are commonly used in physics courses is called the MKS system (for meterkilogram-second). In SI units temperature is measured in Kelvin (K). A less well-known quantity is charge. The SI unit for quantity of charge is the Coulomb (C). One coulomb is equal to the total charge of 6.24 x 10 18 protons. Many other quantities are derived from these basic units and are given their own names. Below is a summary of the main quantities of interest in this course.

unknown authors

2009-01-01T23:59:59.000Z

460

Fuel Cell Technologies Office: Catalysis Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Catalysis Working Catalysis Working Group to someone by E-mail Share Fuel Cell Technologies Office: Catalysis Working Group on Facebook Tweet about Fuel Cell Technologies Office: Catalysis Working Group on Twitter Bookmark Fuel Cell Technologies Office: Catalysis Working Group on Google Bookmark Fuel Cell Technologies Office: Catalysis Working Group on Delicious Rank Fuel Cell Technologies Office: Catalysis Working Group on Digg Find More places to share Fuel Cell Technologies Office: Catalysis Working Group on AddThis.com... Key Activities Plans, Implementation, & Results Accomplishments Organization Chart & Contacts Quick Links Hydrogen Production Hydrogen Delivery Hydrogen Storage Fuel Cells Technology Validation Manufacturing Codes & Standards Education Systems Analysis

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

State & Tribal Government Working Group (STGWG) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tribal Programs State & Tribal Government Working Group (STGWG) State & Tribal Government Working Group (STGWG) In April 1989, ten governors wrote a letter to then-Secretary of...

462

Federal Energy Management Program: Product Procurement Working...  

NLE Websites -- All DOE Office Websites (Extended Search)

Product Procurement Working Group to someone by E-mail Share Federal Energy Management Program: Product Procurement Working Group on Facebook Tweet about Federal Energy Management...

463

How Radar Works | Open Energy Information  

Open Energy Info (EERE)

2013 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for How Radar Works Citation Institute For Geophysics. How Radar Works...

464

Renewable Energy Working Group: October 19, 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

eere.energy.gov Federal Energy Management Program October 2011 Open Meeting of the Renewable Energy Working Group Anne Crawley Technology Manager Renewable Energy Working Group...

465

Climate VISION: Private Sector Initiatives: Semiconductors: Work...  

Office of Scientific and Technical Information (OSTI)

Work Plans The Semiconductor Industry Association has finalized its work plan with the collaboration of EPA. The plan describes actions the industry intends to take to achieve its...

466

Transportation Protocols Working Group First Conference Call...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Call March 1, 1999 Conference Call Summary The first conference call of the Transportation External Coordination Working Group (TECWG) DOE Transportation Protocols Working...

467

SolarWorks NJ | Open Energy Information  

Open Energy Info (EERE)

Jersey Sector Renewable Energy, Solar Product SolarWorks NJ, LLC, a provider of turnkey solar electricity installations and renewable energy solutions. References SolarWorks...

468

Working with CFTF | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

CFTF Working with CFTF CFTF | Carbon Fiber Technology Facility Home | User Facilities | CFTF | Working with CFTF SHARE Low-Cost Carbon Fiber Available to US Manufacturers for...

469

NREL: Electricity Integration Research - Working With Us  

NLE Websites -- All DOE Office Websites (Extended Search)

Working With Us NREL offers industry, universities, and other government agencies opportunities to leverage NREL's research expertise. Working with outside organizations is the key...

470

Fermilab at Work - Manuals and Forms  

NLE Websites -- All DOE Office Websites (Extended Search)

Fermilab at Work Home Home FAW Home Fermilab Now Directories and Maps Work Resources Policies and Forms Administration Lab Life Physics Links Experiments and Projects Divisions and...

471

Argonne TDC: Sponsored Research (Work for Others)  

Sponsored Research (Work for Others) Argonne National Laboratory can perform work for a number of different Federal and non-Federal sponsors. These ...

472

Master of Social Work Program STUDENT HANDBOOK  

E-Print Network (OSTI)

Master of Social Work Program STUDENT HANDBOOK 2013-2014 Academic Year #12;TABLE OF CONTENTS SECTION I: MU-SU MSW PROGRAM ............................................................................................ 1 SOCIAL WORK EDUCATION

Hardy, Christopher R.

473

Underground Natural Gas Working Storage Capacity - Energy ...  

U.S. Energy Information Administration (EIA)

... Demonstrated maximum working gas volume is the sum of the highest storage inventory levels of working gas observed in each facility over the previous 5-year ...

474

California Working Natural Gas Underground Storage Capacity ...  

U.S. Energy Information Administration (EIA) Indexed Site

Working Natural Gas Underground Storage Capacity (Million Cubic Feet) California Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Decade Year-0 Year-1 Year-2...

475

Mississippi Working Natural Gas Underground Storage Capacity...  

U.S. Energy Information Administration (EIA) Indexed Site

Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Mississippi Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Decade Year-0 Year-1 Year-2...

476

Pennsylvania Working Natural Gas Underground Storage Capacity...  

U.S. Energy Information Administration (EIA) Indexed Site

Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Pennsylvania Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Decade Year-0 Year-1 Year-2...

477

Washington Working Natural Gas Underground Storage Capacity ...  

U.S. Energy Information Administration (EIA) Indexed Site

Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Washington Working Natural Gas Underground Storage Capacity (Million Cubic Feet) Decade Year-0 Year-1 Year-2...

478

Work and Car Ownership Among Welfare Recipients  

E-Print Network (OSTI)

Work and Car Ownership Among Welfare Recipients Paul Ongregulation. or Work and Car Ownership Among Welfareexamining the pivotal role of car ownershipin facilitating

Ong, Paul

1995-01-01T23:59:59.000Z

479

Working With Us - Center for Transportation Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Working With Us Types of working agreements Cooperative Research and Development Agreement (CRADA) DOE typically pays the lab costs. The private-sector partner can provide either...

480

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

2 Household Demographics of U.S. Homes, by Owner/Renter Status, 2009" 2 Household Demographics of U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,"Total U.S.1 (millions)",,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" "Household Demographics",,"Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent" "Total Homes",113.6,76.5,37.1,63.2,8.6,3.9,2.8,1.5,7.6,2.3,16.8,5.5,1.4 "Number of Household Members"

Note: This page contains sample records for the topic "work units swu" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

2 Televisions in U.S. Homes, by Owner/Renter Status, 2009" 2 Televisions in U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,,,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" ,"Total U.S.1 (millions)" ,,"Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent" "Televisions" "Total Homes",113.6,76.5,37.1,63.2,8.6,3.9,2.8,1.5,7.6,2.3,16.8,5.5,1.4 "Televisions" "Number of Televisions"

482

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

2 Air Conditioning in U.S. Homes, by Owner/Renter Status, 2009" 2 Air Conditioning in U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,,,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" ,"Total U.S.1 (millions)" "Air Conditioning",,"Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent" "Total Homes",113.6,76.5,37.1,63.2,8.6,3.9,2.8,1.5,7.6,2.3,16.8,5.5,1.4 "Air Conditioning Equipment"

483

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

2 Space Heating in U.S. Homes, by Owner/Renter Status, 2009" 2 Space Heating in U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,,,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" ,"Total U.S.1 (millions)" ,,"Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent","Own","Rent" "Space Heating" "Total Homes",113.6,76.5,37.1,63.2,8.6,3.9,2.8,1.5,7.6,2.3,16.8,5.5,1.4 "Space Heating Equipment"

484

E-831 United States Government  

Office of Legacy Management (LM)

bOE 51325.8 bOE 51325.8 - E-831 United States Government memorandum pa? 1.- -g..bJ %i7Dm--~, I' )! f&,:& Department of Energy DATE: OCT 9 1984 REPLY T O NE-20 ATTN OF: Authorizations for Actions Under the Formerly Utilized Sites Remedial Action SUBJECT: Program (FUSRAP) at the St. Louis Airport Storage Site, St. Louis, M O . and the W . R. Grace Site at Curtis Bay, Md. To: J. LaGrone, Manager Oak Ridge Operations O ffice St. Louis Airport Storage Site, M O The House and Senate Reports for the Energy and W a ter Development Appropriation Act (P.L. 98-360) directed the Department of Energy "...to take the necessary steps to consolidate and dispose of the waste material from the Latty Avenue site and nearby St. Louis Airport vicinity properties locally, by reacquiring , stabilizing, and using the old 21.7

485

UNITED STATES GOVERNIMI~NT  

Office of Legacy Management (LM)

.;. ,! r ?- 1; ,: ( ,T .;. ,! r ?- 1; ,: ( ,T UNITED STATES GOVERNIMI~NT 7.;; ,:;$ _ a, -;::I-;. t, ,. :., .~, . ,.,,, : Thomas J. McCarvill, Chief, Physical Exploration Branch, Division of Baw : Reginald W. Bdmonds, Mining Engineer Division of Raw Naterials SUBJECT: MONAZITB DREDGING OPERATIONS AhD PLACER DEPOSITS CONTAINING TBOL~IIJM MINER&S SYXBOL: B&PM3 While at the Bureau of Mines office on June 2, 1955, Mr. Prank Lamb gave me the following information: The contract covering monazite production between Baumhoff-P~shall, Inc., and tke Lindsay Chemical Compaq expired early this year. Rro dredges ara still operating In the Cascade area, Valley County, Idaho, but expect to shut down about August 1 when monaaite require- ments under the Government contract will be completed. The two dredges

486

United States Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CK-1-H Availability: This rate schedule shall be available to public bodies served through the facilities of Kentucky Utilities Company, (hereinafter called the Customers.) Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a nominal frequency of 60 hertz. The power shall be delivered at nominal voltages

487

United States General Accounting Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, DC 20548 Washington, DC 20548 Comptroller General of the United States Decision Matter of: The Jones/Hill Joint Venture File: B-286194.4; B-286194.5; B-286194.6 Date: December 5, 2001 William A. Roberts III, Esq., Phillip H. Harrington, Esq., William S. Lieth, Esq., and Janet L. Eichers, Esq., Wiley, Rein & Fielding, for the protester. Marvin D. Norman, Esq., Vicki E. O'Keefe, Esq., and Robert E. Little, Jr., Esq., Department of the Navy, for the agency. Louis A. Chiarella, Esq., John L. Formica, Esq., and James A. Spangenberg, Esq., Office of the General Counsel, GAO, participated in the preparation of the decision. DIGEST 1. A conflict of interest existed in an Office of Management and Budget Circular A-76 commercial activities study where a Navy employee and a private-sector consultant

488

United Nations | OpenEI  

Open Energy Info (EERE)

Nations Nations Dataset Summary Description (Abstract): Project overview describing rationale, products and partners of the UNEP/GEF Solar and Wind Energy Resource Assessment project. (Purpose): Project overview for presentation at the Asia regional meeting at the Second International Conference on Renewable Energy Technology for Rural Development (RETRUD-03) in Katmandu on 12-14 October 2003 Source NREL Date Released October 14th, 2003 (11 years ago) Date Updated October 20th, 2007 (7 years ago) Keywords GEF solar SWERA UNEP United Nations wind Data application/zip icon Download Presentation (zip, 5 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period 1997 License License Other or unspecified, see optional comment below

489

United States Nuclear Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

qU oSoLTJRC qU oSoLTJRC United States Nuclear Regulatory Commission Protecting People and the Environment NUREG-1872, Vol. 2 HudcD [jE©wftamfsýýpc Wafm(M oran EA Office of New Reactors AVAILABILITY OF REFERENCE MATERIALS IN NRC PUBLICATIONS NRC Reference Material As of November 1999, you may electronically access NUREG-series publications and other NRC records at NRC's Public Electronic Reading Room at http:t/www.nrc..ov/reading-rm.html. Publicly released records include, to name a few, NUREG-series publications; Federal Register notices; applicant, licensee, and vendor documents and correspondence; NRC correspondence and internal memoranda; bulletins and information notices; inspection and investigative reports; licensee event reports; and Commission papers and their attachments.

490

UNITED STATES DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DAVID N. "DAVE" LOPEZ DAVID N. "DAVE" LOPEZ Title: Senior Aviation Policy Officer Organization: Office of Aviation Management/MA-30 Address: Headquarters, United States Department of Energy 1000 Independence Avenue S.W. Washington, D.C. 20585 E-mail Address: David.Lopez@hq.doe.gov Phone Number: Office: (202) 586-6177, Mobile: (240) 449-0895 Fax Number: (202) 586-6008 Biographical Summary: Dave Lopez is a highly skilled manager and leader with over 34 years experience in government aviation operations and staff management /oversight programs. As an Air Force pilot, he served in a wide variety of aviation operations and management positions, and he retired in 1999 in the grade of Colonel as the Director, Commander-in-Chief's Staff Group, U.S. Strategic Command, Offutt AFB, NE. He joined DOE in 2000 as

491

Gas generator and turbine unit  

SciTech Connect

A gas turbine power unit is disclosed in which the arrangement and configuration of parts is such as to save space and weight in order to provide a compact and self-contained assembly. An air-intake casing supports the upstream end of a gas generator, the down-stream end of which is integral with a power turbine. The stator casing of the turbine is connected to a cone thermally insulated and completely inserted into any exhaust casing having a vertical outlet, wherein the turbine exhaust is conveyed into the exhaust casing by an annular diffusing cone. The turbine casing is supported on four legs. In addition, the turbine rotor and thus the turbine shaft are overhangingly supported by an independent structure, the weight of which bears on the machine base outside the exhaust casing and away of the power turbine space.

Vinciguerra, C.

1984-12-11T23:59:59.000Z

492

WORKING PARK-FUEL CELL COMBINED HEAT AND POWER SYSTEM  

DOE Green Energy (OSTI)

This report covers the aims and objectives of the project which was to design, install and operate a fuel cell combined heat and power (CHP) system in Woking Park, the first fuel cell CHP system in the United Kingdom. The report also covers the benefits that were expected to accrue from the work in an understanding of the full technology procurement process (including planning, design, installation, operation and maintenance), the economic and environmental performance in comparison with both conventional UK fuel supply and conventional CHP and the commercial viability of fuel cell CHP energy supply in the new deregulated energy markets.

Allan Jones

2003-09-01T23:59:59.000Z

493

Current work in energy analysis  

SciTech Connect

This report describes the work performed at Berkeley Lab most recently. One of the Labs accomplishments is the publication of Scenarios of US Carbon Reductions, an analysis of the potential of energy technologies to reduce carbon emissions in the US. This analysis is described and played a key role in shaping the US position on climate change in the Kyoto Protocol negotiations. The Labs participation in the fundamental characterization of the climate change issue by the IPCC is described. Described also is a study of leaking electricity, which is stimulating an international campaign for a one-watt ceiling for standby electricity losses from appliances. This ceiling has the potential to save two-thirds of the 5% of US residential electricity currently expended on standby losses. The 54 vignettes contained in the report summarize results of research activities ranging in scale from calculating the efficacy of individual lamp ballasts to estimating the cost-effectiveness of the national Energy Star{reg_sign} labeling program, and ranging in location from a scoping study of energy-efficiency market transformation in California to development of an energy-efficiency project in the auto parts industry in Shandong Province, China.

NONE

1998-03-01T23:59:59.000Z

494

Accumulated waste characterization work plan  

Science Conference Proceedings (OSTI)

The Portsmouth Gaseous Diffusion Plant (PORTS) as part of the uranium enrichment complex produces enriched uranium for power generation and defense purposes. Since the beginning of diffusion plant operations in 1953, a variety of waste materials and excess equipment has been generated through both normal operations and as part of major system upgrade programs. However, as a result of the closure of former onsite radioactive management facilities and limited onsite and offsite disposal facilities for mixed (hazardous and radioactive) wastes, PORTS has accumulated large quantities of waste awaiting final disposition. These accumulated wastes were estimated in the Accumulated Waste Plan (AWP) to consist of some 21,700 containers of the radioactive, RCRA hazardous, PCB, mixed and asbestos wastes in various storage areas and process buildings with PORTS. In order to proper manage these wastes onsite and prepare for them for ultimate treatment or disposal, a detailed understanding of the waste contents and characteristics must be developed. The strategy for managing and disposing of these wastes was outlined in the AWP. The purpose of this Accumulated Waste Characterization Work Plan (AWCWP) is to provide a detailed plan for characterizing waste containers from the existing PORTS inventory. The AWCWP documents the process and analytical information currently available and describes statistically-based sampling and analyses required to support proper regulatory classification.

Not Available

1992-01-01T23:59:59.000Z

495

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

Air Conditioning in U.S. Homes, by Housing Unit Type, 2009" Air Conditioning in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Air Conditioning" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Air Conditioning Equipment" "Use Air Conditioning Equipment",94,61.1,5.6,6.3,15.2,5.8 "Have Air Conditioning Equipment But" "Do Not Use It",4.9,2.6,0.2,0.7,0.9,0.4 "Do Not Have Air Conditioning Equipment",14.7,8.1,0.9,2.1,3,0.7 "Type of Air Conditioning Equipment "

496

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

Household Demographics of U.S. Homes, by Housing Unit Type, 2009" Household Demographics of U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Household Demographics" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Number of Household Members" "1 Person",31.3,14.4,2.1,3.4,9.6,1.9 "2 Persons",35.8,24.2,1.9,2.5,5,2.1 "3 Persons",18.1,12.1,1.2,1.3,2.2,1.2 "4 Persons",15.7,11.5,1,1,1.5,0.8 "5 Persons",7.7,5.8,0.3,0.5,0.6,0.5

497

Next Generation Rooftop Unit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Next Generation Rooftop Unit Next Generation Rooftop Unit Next Generation Rooftop Unit The U.S. Department of Energy is currently conducting research in a next generation rooftop unit (RTU). More than half of U.S. commercial building space is cooled by packaged heating, ventilation, and air conditioning (HVAC) equipment. Existing rooftop HVAC units consume more than 1.3% of the United States' annual energy usage annually. Project Description This project seeks to evaluate optimal design strategies for significantly improving the efficiency of rooftop units. The primary market for this project is commercial buildings, such as supermarkets and hotels. Project Partners Research is being undertaken through a cooperative research and development agreement (CRADA) between the Department of Energy and Oak Ridge National

498

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

Water Heating in U.S. Homes, by Housing Unit Type, 2009" Water Heating in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Water Heating" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Number of Storage Tank Water Heaters" 0,2.9,1.8,0.1,0.2,0.6,0.1 1,108.1,67.5,6.5,8.8,18.5,6.8 "2 or More",2.7,2.5,0.1,"Q","Q","Q" "Number of Tankless Water Heaters2" 0,110.4,69.5,6.5,8.9,18.6,6.8 1,3.1,2.2,0.2,0.2,0.5,"Q"

499

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

Fuels Used and End Uses in U.S. Homes, by Housing Unit Type, 2009" Fuels Used and End Uses in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Fuels Used and End Uses" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Fuels Used for Any Use" "Electricity",113.6,71.8,6.7,9,19.1,6.9 "Natural Gas",69.2,45.6,4.7,6.1,11,1.8 "Propane/LPG",48.9,39.6,2.4,1.7,2,3.2 "Wood",13.1,11.4,0.3,0.2,0.5,0.7 "Fuel Oil",7.7,5.1,0.4,0.7,1.3,0.1

500

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

Space Heating in U.S. Homes, by Housing Unit Type, 2009" Space Heating in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Space Heating" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Space Heating Equipment" "Use Space Heating Equipment",110.1,70.5,6.5,8.7,17.7,6.7 "Have Space Heating Equipment But Do " "Not Use It",2.4,0.8,0.2,0.2,1,0.1 "Do Not Have Space Heating Equipment",1.2,0.6,"Q",0.1,0.4,"Q"