  1. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S. Department of Energy (DOE) approved work plan. FY 2016 Work Plan Work plan items focus on providing recommendations to the DOE regarding the following subjects: soil contamination from historic atmospheric nuclear testing, remediation of contaminated facilities used to support historic testing, groundwater studies

  2. Status Update on Action 2a: Implementation Handbook for Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by James Winter, NA-00-10. DOE Handbook: Implementing Activity-Level Work Planning & Control at Nuclear Facilities. Project Justification Statement submitted 1-29-13, with focus upon improved implementation of WP&C and activity-level work. Provides the background, project plan, and key elements of a new DOE handbook on implementing activity-level work planning and control at DOE nuclear facilities.

  3. Mon Valley work plan

    Office of Legacy Management (LM)

    GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for ... . . . . . . . . 1-1 1.3 Sources of Ground-Water Contamination from Milling Operations . . ...

  4. Quality Work Plan Requirements

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance, as well as links to the individual requirements.

  5. CRAD, Work Controls Assessment Plan

    Broader source: Energy.gov [DOE]

    Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed.

  6. WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL

    Office of Legacy Management (LM)

    WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community

  7. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  8. Quality Work Plan Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    * No national standards for work quality * No portable and nationally recognized credentials for experienced WAP workers 3 NaConal Issues and Interests Supported the QWP * White ...

  9. Work plan (Nov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM STM Cloud Modeling Working Group Session AGENDA Brief introduction of new ARM funded modeling projects: ---------------------------------------------------------------------------------------------------------- 1:00 pm - 1:05 pm Understanding and Improving CRM and GCM Simulations of Cloud Systems with ARM Observations (Xiaoqing Wu, Iowa State University) 1:05 pm - 1:10 pm Interactions of Cumulus Convection and the Boundary Layer at the Southern Great Plains ACRF (Steve Krueger, University of

  10. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  11. Status Update on Action 2c: Criteria Review and Approach Document (CRAD) for Performing Assessments of Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bradley K. Davy, Director, Office of Worker Safety and Health Assistance, HS. Criteria Review and Approach Document (CRAD) for Performing Assessments of Activity- Level Work Planning and Control. DOE CRAD Development Approach.

  12. NJOY2012 - Current Status and Future Plans

    SciTech Connect (OSTI)

    Kahler, Albert Comstock III

    2015-10-05

    An overview of the NJOY Nuclear Data Processing Code System, including recent history, current status and near-term upgrade plans is presented.

  13. Physics Division Work Planning Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements The following is Physics Division requirements related to work planning, control and authorization for work projects and test set ups in division work areas across the laboratory. For the testing and commissioning of experimental equipment the consequences/cost of said equipment should receive careful consideration when doing the risk analysis. * Any small setup or task with total duration of less than two weeks requires an informal task hazard analysis. Informal means we can do

  14. FY 1996 annual work plan

    SciTech Connect (OSTI)

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  15. September 2012, Training Work Group Status Overview

    Broader source: Energy.gov (indexed) [DOE]

    Training Work Group Status Overview Accomplishments: 1. May 7-8. Attended NIEHS Trainer's ... Char Wells, Sandia National Laboratory Training Manager, (NTC, NIEHS and HAMMER in ...

  16. ILDG Middleware Working Group Status Report

    SciTech Connect (OSTI)

    B. Joo; W. Watson

    2004-09-01

    We report on the status of the ILDG Middleware Working Group. The Middleware Working Group was formed with the aim of designing standard middleware to allow the interoperation of the data grids of ILDG member collaborations. Details of the working group are given. In this contribution we outline the role of middleware in the ILDG, present our proposed middleware architecture and discuss our current status and future work within the working group.

  17. September 2012, Work Force Retention Work Group Status Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 Protective Force ...

  18. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COUNCIL - WORK PLANNING FORMAT: Natural Gas Use in Transportation PDF icon RCC Workplan NGV.PDF More Documents & Publications REGULATORY COOPERATION COUNCIL - WORK PLANNING ...

  19. TWRS Systems Engineering Working Plan

    SciTech Connect (OSTI)

    Eiholzer, C.R.

    1994-09-16

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations.

  20. Waste Isolation Pilot Plant Status and Plans - 2010 | Department...

    Office of Environmental Management (EM)

    Status and Plans - 2010 Waste Isolation Pilot Plant Status and Plans - 2010 Overview of WIPP presented by Dr. Dave Moody. Waste Isolation Pilot Plant Status and Plans - 2010 (1.93 ...

  1. Work Plans & Manuals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Plans & Manuals Work Plans & Manuals This list contains audit and inspections manuals and a list of planned reviews to be conducted by the Office of Audits and Inspections. Documents Available for Download November 20, 2014 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 December 23, 2014 Audit Manual 2014 Office of Inspector General Audit Manual

  2. July 2012, Work Force Retention Work Group Status Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group

  3. Fiscal Year 2015 Annual Work Plan Update

    Broader source: Energy.gov [DOE]

    At the February 18, 2015 Committee meeting Overview and Synopsis of the Work Planned for FY'15 at LANL

  4. Strategic Initiatives Work Group Status Overview - July 2012 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy July 2012 Strategic Initiatives Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews (83.65 KB) More Documents & Publications Strategic Initiatives Work Group Status Overview - September 2012 10 CFR 851 Work Group Status Overview - July 2012 Workforce Retention Work Group Status Overview - July 2012

  5. Workforce Retention Work Group Status Overview - July 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy July 2012 Workforce Retention Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews (86.1 KB) More Documents & Publications Workforce Retention Work Group Status Overview - September 2012 Strategic Initiatives Work Group Status Overview - July 2012 10 CFR 851 Work Group Status Overview - July 2012

  6. Work Plan FY 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Plan FY 2016 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 A list of audits and inspections planned for FY 2016 by the U.S. Department of Energy, Office of Inspector General, Office of Audits and Inspections Work Plan FY 2016 (218.5 KB) More Documents & Publications Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Planned Audits and Inspections FY 2013 Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs

  7. Weatherization Assistance Program Quality Work Plan Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Work Plan Requirements Weatherization Assistance Program Quality Work Plan Requirements Four square graphic of a document, a conversation bubble, a checkbox and a certification seal. The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization

  8. Training Work Group Status Overview - July 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2012 Training Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews (86.72 KB) More Documents & Publications Training Work Group Status Overview - September

  9. Training Work Group Status Overview - September 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2012 Training Work Group Status Overview - September 2012 Documents Available for Download September 2012 Status Overviews (115.87 KB) More Documents & Publications Training Work Group Status Overview - July

  10. Hanford Advisory Board Fiscal Year 2015 Interim Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2015 Work Plan-Facilitator notes on midyear status for TWC-lead topics (10/22/15) Page 1 of 3 Topic Committee Assignment Potential FY 2015 Action/Product Context 6-Month Status (IM, Committee, Advice, Deferred, No Action) 6. Safety Culture Improvement Efforts TWC Informational Improvement actions in response to the June 2014 follow-up Assessment of Safety Culture - focusing on Office of River Protection (ORP) and the Waste Treatment and Immobilization Plant (WTP). Report anticipated

  11. Fusion Nuclear Science and Technology Program - Status and Plans...

    Office of Environmental Management (EM)

    Plans for Tritium Research Fusion Nuclear Science and Technology Program - Status and Plans for Tritium Research Presentation from the 34th Tritium Focus Group Meeting held in ...

  12. Fusion Nuclear Science and Technology Program - Status and plans...

    Office of Environmental Management (EM)

    plans for tritium research Fusion Nuclear Science and Technology Program - Status and plans for tritium research Presentation from the 35th Tritium Focus Group Meeting held in ...

  13. July 2012, Training Work Group Status Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Work Group Status Overview Accomplishments: 1. May 7 - 8. Attended NIEHS Trainer's Exchange in Oak Ridge . 2. May 8 - 9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker Pilot. 3. June 19-20. Joined Char Wells at Sandia (with NIEHS and HAMMER) for the Learning/Training Workshop. 2. NTC offered support for Data Warehousing at the Learning/Training Workshop. 3. Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business

  14. MMCR Upgrades: Present Status and Future Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital

  15. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 10/08/2013 December (no committee mtgs) January February PNNL update on geophysics characterization (where does this fit into the HAB FY2014 Work Plan?) Update on 100-N RI/FS and Proposed Plan Rev 0; advice development o Review of recommendations of proposed plans o Draft A = Committee Round Robin; Rev 0 = Advice 100-N Groundwater Modeling Tutorial Update on Orchard Lands Work Plan o Review of recommendations of proposed plans o Draft A = Committee Round Robin; Rev 0 = Advice Online

  16. Workforce Retention Work Group Status Overview - September 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy September 2012 Workforce Retention Work Group Status Overview - September 2012 Documents Available for Download September 2012 Status Overviews (103.95 KB) More Documents & Publications Workforce Retention Work Group Status Overview - July 2012 Work Force Retention Work Group Charter Work Group Telecon (Final Charters)

  17. PCMDI software system: status and future plans report no. 44

    SciTech Connect (OSTI)

    Williams, Dean N.

    1997-08-01

    This report describes the current status and future plans of PCMDI`s software products. A complete description of each product is provided, including the product`s problem statement, purpose, requirements, design diagram, current status, future development, developers, contributors, and off-site collaborators. While it is noted that each software product can be executed as an independent process, it is important to discern that all products work together in the complete PCMDI Software Systems: A suite of software tools facilitating for the storage, diagnosis, and visualization of climate data.

  18. Transportation Plan Ad Hoc Working Group | Department of Energy

    Office of Environmental Management (EM)

    Plan Ad Hoc Working Group Transportation Plan Ad Hoc Working Group PDF icon Transportation Plan Ad Hoc Working Group More Documents & Publications Nuclear Fuel Storage and...

  19. Status Update on Action 2b: Revision of DOE G 226.1-2 with new Guidance for Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Strengthen guidance and formality associated with contractor implementation and Federal monitoring of activity-level WP&C. Develop a DOE Guide on Federal oversight and evaluation of the effectiveness of Activity-Level WP&C.

  20. Strategic Initiatives Work Group Status Overview - September 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy September 2012 Strategic Initiatives Work Group Status Overview - September 2012 Documents Available for Download September 2012 Status Overviews (121.47 KB) More Documents & Publications Strategic Initiatives Work Group Status Overview - July 2012 Focus Group Meeting (Activities Status) Active Labor Unions Interfacing with DOE - June 2014

  1. Office of Inspector General fiscal year 1996 annual work plan

    SciTech Connect (OSTI)

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  2. PIC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/18/15 (Blue titles indicate those topics specifically identified in the 2015 HAB Work Plan; Italicized items indicate tentative) February March April Committee Call 2/18 Committee Call Placeholder 3/18 Committee Mtg Placeholder 4/7 (1 p.m. - 5 p.m.) Committee Business o Update 3-month committee work plan o Round-robin of HAB member outreach Debrief TPA Agency Public Involvement Events o What worked well; what didn't work well o Identify areas of possible improvements Holding Bin for future PIC

  3. Hanford Advisory Board Fiscal Year 2015 Interim Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Interim Work Plan Adopted by consensus September 5, 2014; comments from October committee discussions 1 Proposed additions from October TWC and RAP committee discussions in RED Topic Quarter 1 10/ 2014 - 12/2014 Quarter 2 01/2015- 03/2015 Quarter 3 04/2015 - 06/2015 Quarter 4 07/2015 - 09 2015 Committee Assignment (lead in Bold) Deferred Maintenance Plan Agency Lead: Kyle Rankin, DOE-RL Chief Engineer Action: Policy discussion Potential HAB Action: _____ Context: The status of structures on

  4. B Plant Complex preclosure work plan

    SciTech Connect (OSTI)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

  5. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5/12/15 Facilitator notes in blue June Committee meeting placeholder: Tuesday, June 16 Call placeholder: Tuesday, June 23, 1:30 p.m. August Committee meeting placeholder: Tuesday, August 4 Call placeholder: Tuesday, August 11, 1:30 p.m. September Committee meeting placeholder: Tuesday, Sept. 22 Call placeholder: Tuesday, Sept. 29, 1:30 p.m.  No topics planned for June meeting  RI/FS work plans for SW-2, WA-1, and DV-1  200 Area groundwater remediation (follow up, 100-N)  Call planned

  6. Burn site groundwater interim measures work plan.

    SciTech Connect (OSTI)

    Witt, Jonathan L.; Hall, Kevin A.

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  7. Hanford Advisory Board FY2014 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1/2013 Hanford Advisory Board FY2014 Work Plan Page 1 of 8 Topic Policy Level Issue HAB Action 1 Agency Priority for HAB Committee Assignment (lead in bold) Comments Site-Wide Tank Closure & Waste Management EIS * Protectiveness * Feasibility * Budget impacts * Schedule impacts * Review proposed/publicized RODs Potential Advice PIC, RAP, TWC River Corridor 618-11 Start in time to end in time Tracking (diligence) RAP 1 Advice, foundational understanding for subsequent year's priority work,

  8. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  9. September 2012, 10 CFR 851 Work Group Status Overview

    Broader source: Energy.gov (indexed) [DOE]

    10 CFR 851 Work Group Status Overview Accomplishments: 1. March 2012. 10 CFR 851 Workshop was held in conjunction with the 2012 Chemical Management Workshop. 2. Communication tools ...

  10. China-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name China-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  11. ClimateWorks-Egypt-Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks-Egypt-Low Carbon Growth Planning Support Redirect page Jump to: navigation, search REDIRECT ClimateWorks Low Carbon Growth Planning Support Retrieved from "http:...

  12. Enterprise Assessments Targeted Review, Work Planning and Control...

    Energy Savers [EERE]

    Work Planning and Control at the Nevada National Security Site - October 2015 Enterprise Assessments Targeted Review, Work Planning and Control at the Nevada National Security Site ...

  13. Enterprise Assessments Targeted Review, Work Planning and Control...

    Energy Savers [EERE]

    Review, Work Planning and Control at the Hanford Tank Farms - April 2015 Enterprise Assessments Targeted Review, Work Planning and Control at the Hanford Tank Farms - April 2015...

  14. Enterprise Assessments Targeted Review of Work Planning and Control...

    Energy Savers [EERE]

    Review of Work Planning and Control at the Hanford Central Plateau Environmental Remediation Projects - June 2015 Enterprise Assessments Targeted Review of Work Planning and...

  15. Microsoft Word - Final FY14 WM Committee Work Plan 093013

    Office of Environmental Management (EM)

    4 Work Plan Approved September 25, 2013 1 Northern New Mexico Citizens' Advisory Board (NNMCAB) WASTE MANAGEMENT COMMITTEE 2014 Work Plan SECTION I. MISSION STATEMENT The Northern...

  16. Kenya-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Kenya-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  17. India-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name India-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  18. Brazil-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Brazil-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  19. Guyana-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Guyana-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  20. Mexico-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Mexico-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  1. Malaysia-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    Malaysia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Malaysia-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks,...

  2. Indonesia-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Indonesia-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  3. Egypt-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Egypt-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  4. Ethiopia-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    Ethiopia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Ethiopia-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks,...

  5. Housekeeping category corrective action unit work plan

    SciTech Connect (OSTI)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  6. Technical WOrk Plan for: Construction Effects Monitoring

    SciTech Connect (OSTI)

    S. Goodin

    2006-09-14

    This document is the technical work plan (TWP) for performing the Construction Effects Monitoring (CEM) activity, which is one of 20 testing and monitoring activities included in Performance Confirmation Plan (BSC 2004 [DIRS 172452]). Collectively, the 20 activities make up the Performance Confirmation Program described in the plan. Each of the other 19 activities will have a separate TWP. This plan, though titled Construction Effects Monitoring, in accordance with the Performance Confirmation Plan, also includes testing that may be performed in addition to monitoring, if required. Performance confirmation is required by regulation 10 CFR Part 63 [DIRS 173273], and was started during site characterization (consistent with the regulation) and will continue until permanent closure of the repository (10 CFR 63.13 1 (b) [DIRS 173273]). This CEM activity has two primary goals: (1) to collect, analyze, and report on repository rock properties data for the purpose of confirming geotechnical and design parameters used in repository design, and (2) to provide information intended to confirm that the ability to retrieve waste from the repository has been preserved. It will be necessary for information from this CEM activity to be evaluated in combination with that obtained from other Performance Confirmation Program activities to achieve these goals. These relationships with other Performance Confirmation Program activities (e.g., drift inspection, subsurface mapping, and seismicity monitoring) will be discussed in later sections of this TWP.

  7. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1/19/15 Facilitator notes in blue January Committee meeting placeholder: Wednesday, Jan. 13 Call placeholder: Wednesday, Jan. 19, 3:00 p.m. February Committee meeting placeholder: Wednesday, Feb. 10 Call placeholder: Tuesday, Feb. 16, 3:00 p.m. March Committee meeting placeholder: Wednesday, Mar. 16 Call placeholder: Tuesday, Mar. 22, 3:00 p.m.  Committee call to discuss issue manager work and finalize February agenda  WTP Communication Approach  Cesium/LAWPS  AY-102 Status (update

  8. PIC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    worked well; what didn't work well o Identify areas of possible improvements Holding Bin for future PIC meeting topics WTP Communications Strategy o Debrief the TWC discussion from December o Identify PIC next steps as applicable including review of draft white paper if available Frame TPA Tutorial o Based on the tutorial given in November, discuss any additional framing questions/points to bring forward to the full Board in February Brainstorm Tutorial Topics o 100 D/H Proposed Plan Committee

  9. Final work plan for targeted sampling at Webber, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2006-05-01

    This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

  10. Atmospheric Radiation Measurement Program Science Plan. Current Status and

    Office of Scientific and Technical Information (OSTI)

    Future Directions of the ARM Science Program (Technical Report) | SciTech Connect Technical Report: Atmospheric Radiation Measurement Program Science Plan. Current Status and Future Directions of the ARM Science Program Citation Details In-Document Search Title: Atmospheric Radiation Measurement Program Science Plan. Current Status and Future Directions of the ARM Science Program The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate

  11. Waste Isolation Pilot Plant Status and Plans - 2010

    Office of Environmental Management (EM)

    Status and Plans WIPP Status and Plans - - 2010 2010 National Transportation Stakeholders Forum National Transportation Stakeholders Forum Chicago, Illinois Chicago, Illinois May 26, 2010 May 26, 2010 Dr. Dave Moody Dr. Dave Moody Manager Manager Carlsbad Field Office Carlsbad Field Office May 26, 2010 May 26, 2010 Transportation Success * First shipment to WIPP departed Los Alamos National Laboratory on March 25, 1999 * WIPP honored with U.S. Transport Council award for transportation safety in

  12. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk-based retrieval, IM updatediscussion LAWPSCesium, IM updatediscussion WTP Communication Plan, IM updatediscussion TVAT Implementation Plan Update HOLDING BIN...

  13. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/8/15 Facilitator notes in blue January Committee meeting placeholder: Tuesday, Jan. 12 Call placeholder: Tuesday, Jan. 19, 1:30 p.m. February Committee meeting placeholder: Tuesday, Feb. 9 Call placeholder: Tuesday, Feb. 16, 1:30 p.m. March Committee meeting placeholder: Tuesday, Mar. 5 Call placeholder: Tuesday, Mar. 22, 1:30 p.m.  100 D/H advice discussion  618-10 VPU update  PW-1/3/6 Work Plan (discuss EPA comments) o Will need DOE's responses to comments + general introduction o

  14. HSEP Committee FY 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY 2016 Work Plan Updated 12/10/2015 during the committee meeting Beryllium program update  Placeholder Annual Employee Concerns Program  Placeholder  Hear from new program director at WRPS  Quarter 1 (Oct-Dec) Quarter 2 (Jan-Mar) Quarter 3 (Apr-Jun) Quarter 4 (July-Sept) Holding Bin Transportation Effects on Worker Safety - draft advice  Review of draft advice Safety culture improvement efforts (joint with TWC)  Discuss Sounding Board for upcoming Board meeting o Review

  15. Integration of Safety Culture Attributes into EFCOG Work Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning and Control Guidance Document Integration of Safety Culture Attributes into EFCOG ... Topics Covered: Integration of Safety Culture (SC) Attributes into EFCOG Work Planning and ...

  16. July 2012, HSS Focus Group Strategic Initiatives Work Group - Status Overviews

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Initiatives Work Group Status Overview Accomplishments: 1. June 26. Telecom with USW - Informative near-miss occurrence reporting. 2. June 29. HS-24 finalized and released the Injury and Illness Dashboard. Near Term Goals/Activities: 1. Work Group meeting to be scheduled - address union-expressed issues related to under reporting/near miss reporting; presentation of Injury and Illness Dashboard tool. 2. Work Group action plan to be further developed based on the meeting discussion.

  17. Waste Management Committee Fiscal Year 2015 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5 Work Plan Waste Management Committee Fiscal Year 2015 Work Plan Topics: TA-54 Consent Order Deliverables FY'17 Budget National Waste Forum WM-FY15-WP - November 17, 2014 (255.83

  18. Waste Management Committee Fiscal Year 2012 Work Plan | Department...

    Office of Environmental Management (EM)

    Management Committee Fiscal Year 2012 Work Plan Waste Management Committee Fiscal Year 2012 Work Plan Topics: TA-21 TA-54 RiskBenefit Principles Consent Order PDF icon WM-FY12-WP...

  19. Waste Management Committee Fiscal Year 2014 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Work Plan Waste Management Committee Fiscal Year 2014 Work Plan Topics: TA-54 Consent Order TA-49 Remediation TA-21 Remediation Material Disposal Areas WM-FY14-WP - September 25, ...

  20. Waste Management Committee Fiscal Year 2013 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Work Plan Waste Management Committee Fiscal Year 2013 Work Plan Topics: TA-21 TA-54 RiskBenefit Principles TA-49 Fiscal Year 2012 Budget WM-FY13-WP - September 26, 2012 (13.32

  1. Headquarters Facilities Work Planning and Control Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program (1.88 MB) More Documents & Publications AUDIT REPORT: OAS-L-04-07 CRAD, Feedback and Continuous Improvement - DOE Headquarters - December 4, 2007 Independent Oversight Review, DOE Headquarters Facilities - March 2002

  2. 2014 Quality Work Plan (QWP) Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    14 Quality Work Plan (QWP) Update 2014 Quality Work Plan (QWP) Update This update was given at the 2014 ACI National Home Performance Conference & Trade Show in Detroit, Michigan by Josh Olsen of the U.S. Department of Energy. 2014 Quality Work Plan (QWP) Update Presentation (2.11 MB) More Documents & Publications How to align field guides and standards to the Standard Work Specifications WPN 14-4: Quality Work Plan Requirement WPN 15-4: QUALITY WORK PLAN REQUIREMENT UPDATE

  3. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT RCC Workplan PDF EN FR.PDF (67.81 KB) More Documents & Publications REGULATORY COOPERATION COUNCIL: Annual Workplan for Energy Efficiency Standards, July 2016 REGULATORY COOPERATION COUNCIL: Annual Workplan for Energy Efficiency Standards REGULATORY PARTNERSHIP STATEMENT

  4. An Alfirmotive Action/Equal Opportunity Employer STATUS AND PLANS

    Office of Legacy Management (LM)

    I&s ' c c scilenti ? alamos c laboratoiy of ihe University of California Lsr i'"""', i'" MEXICO 8,545 An Alfirmotive Action/Equal Opportunity Employer STATUS AND PLANS REPORT FOR FORMER TECHNICAL AREA ONE AT LOS ALAMOS SCIENTIFIC LABORATORY HEALTH RESEARCH DIVISION JANUARY i976 I I I I I I I if n II 9 I I I I. I I I I STATUS AND PLANS REPORT FOR FORMER TECHNICAL AREA ONE AT LOS ALAMOS SCIENTIFIC LABORATORY INTRODUCTION Because of increased official and public concern over

  5. Work Plan - U.S.-India Coal Working Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Work Plan - U.S.-India Coal Working Group (700.48 KB) More Documents & Publications Work Group Telecom (Draft Charters) U.S.-India Coal Working Group Terms of Reference Work Group ...

  6. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    24, 3:00 p.m. Swim lanes WTP Communication Plan update( following joint topic w PIC @ their April meeting) Cesium IM update Leadership Retreat Preparation + EM...

  7. Utilities Working with Industry: Action Plan

    SciTech Connect (OSTI)

    none,

    2010-06-25

    This action plan outlines joint ITP and utility activities that will help reach a national goal of reducing energy by 25 percent over then next 10 years.

  8. 10 CFR 851 Work Group Status Overview - July 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2012 10 CFR 851 Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews (67.49 KB) More Documents & Publications 10 CFR 851 Work Group Status Overview - September 2012 Workforce Retention Work Group Status Overview - July 2012 Strategic Initiatives Work Group Status Overview - July 2012

  9. Memorandum, NNSA Activity Level Work Planning & Control Processes, January 2006

    Broader source: Energy.gov [DOE]

    January 23, 2006 Memorandum from Thomas P. D’Agostino, Assistant Deputy Administrator for Program Integration, Action: Revitalizing Integrated Safety Management; Site Office Action Plans for Improving Activity Level Work Planning and Control Processes.

  10. CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development - 2016/17; April 12, 2016 | Department of Energy CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan Development - 2016/17; April 12, 2016 CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan Development - 2016/17; April 12, 2016 Work Plan and Development 2016-04-12 (207.15 KB) More Documents & Publications Canada-United States Regulatory Cooperation Council Webinar: Proposed Approach for Energy Efficiency Standards North America Energy

  11. Office of Enterprise Assessments Targeted Review of Work Planning and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control and Biological Safety at the Los Alamos National Laboratory - December 2015 | Department of Energy Office of Enterprise Assessments Targeted Review of Work Planning and Control and Biological Safety at the Los Alamos National Laboratory - December 2015 Office of Enterprise Assessments Targeted Review of Work Planning and Control and Biological Safety at the Los Alamos National Laboratory - December 2015 December 2015 Review of Work Planning and Control and Biological Safety at the

  12. Enterprise Assessments Targeted Review, Work Planning and Control at the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada National Security Site - October 2015 | Department of Energy Review, Work Planning and Control at the Nevada National Security Site - October 2015 Enterprise Assessments Targeted Review, Work Planning and Control at the Nevada National Security Site - October 2015 October 2015 Targeted Review of the Work Planning and Control at the Nevada National Security Site The U.S. Department of Energy (DOE) Office of Enterprise Assessments (EA) conducted an independent review of activity-level

  13. Integration of Safety Culture Attributes into EFCOG Work Planning and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control Guidance Document | Department of Energy Safety Culture Attributes into EFCOG Work Planning and Control Guidance Document Integration of Safety Culture Attributes into EFCOG Work Planning and Control Guidance Document May 15, 2013 Presenters: Steele Coddington, NSTec, Las Vegas, and John McDonald, WRPS, Hanford Topics Covered: Integration of Safety Culture (SC) Attributes into EFCOG Work Planning and Control Guidance Document Linking SC to WP&C CRADS EFCOG and DOE SC and WP&C

  14. Nevada Site Specific Advisory Board Tackles New Work Plans, Looks...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Specific Advisory Board Tackles New Work Plans, Looks to Future Nevada Site Specific ... groundwater characterization elements during a tour of the Nevada National Security Site. ...

  15. DOE Handbook: Implementing Activity-level Work Planning & Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Lessons Learned Linking Safety Culture and the Effectiveness of WP&C Practices ... Small Beginnings Integration of Safety Culture Attributes into EFCOG Work Planning and ...

  16. 1800 Engineered Safety Work Planning and Controls and HF Delivery...

    Office of Scientific and Technical Information (OSTI)

    Conference: 1800 Engineered Safety Work Planning and Controls and HF Delivery System. ... Country of Publication: United States Language: English Word Cloud More Like This Full ...

  17. Microsoft Word - Final FY14 EMR Committee Work Plan 093013

    Office of Environmental Management (EM)

    Approved September 25, 2013 1 Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2014 Work Plan SECTION I. MISSION STATEMENT...

  18. Office of Enterprise Assessments Targeted Review of Work Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Control and Biological Safety at the Los Alamos National Laboratory - December 2015 Office of Enterprise Assessments Targeted Review of Work Planning and Control and ...

  19. Office of Enterprise Assessments Targeted Review of Work Planning...

    Broader source: Energy.gov (indexed) [DOE]

    of Energy (DOE) Office of Enterprise Assessments (EA) conducted an independent review of activity-level work planning and control at the Hanford Tank Farms. The Tank Farms...

  20. Enterprise Assessments Targeted Review of Work Planning and Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... of activity-level work planning and control (AL-WP&C) at ... programs, and nuclear emergency response capabilities. ... However, EA identified some problems with the specification ...

  1. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4/26/16 Facilitator notes in blue May June August Committee meeting placeholder: Tuesday, May 10 Call placeholder: Tuesday, May 17, 1:30 p.m. Committee meeting placeholder: Tuesday, June 14 Call placeholder: Tuesday, June 21, 1:30 p.m. Committee meeting placeholder: Tuesday, August 9 Call placeholder: Tuesday, August 16, 1:30 p.m.  Call to confirm June agenda (May 17, 1:30 p.m.)  Solid Waste Operations Complex Dangerous Waste Permit Mods status update o RL (TBD); Stuart Luttrell, Ecology

  2. ISM Workshop on Work Planning and Controls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... ISM Champions Workshop 2013 14 play video Integrated Safety Management 15 ISM Champions ... Controls and Work Within Controls: * Feedback and Improvement: Ensure lessons ...

  3. HSEP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HSEMC Homeland Security and Emergency Management Coordination (HSEMC) Program The Office of Emergency Management assists the NNSA and Department of Energy sites in integrating Department of Homeland Security initiatives into the NNSA Emergency Management System (EMS). This program provides NNSA headquarters coverage for emerging presidential directives and assistance... Planning for Emergencies Emergency Management is the application of the necessary resources to mitigate consequences of an

  4. 3210T1 WorkPlanning,Control&Auth;

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    http://www.jlab.org/div_dept/dir_off/public_affairs/logo/JLab_logo_text_white1.jpg TITLE: ES&H Manual DOCUMENT ID: 3210 Appendix T1 Work Planning, Control, and Authorization Procedure 1.0 Purpose This procedure defines work processes and controls and outlines how Jefferson Lab implements its Integrated Safety Management System (ISMS) into the planning and execution of work. These steps include: * Defining the Scope of Work * Analyzing the Hazards * Developing and Implementing Hazard Controls

  5. July 2012, 10 CFR 851 Work Group Status Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10 CFR 851 Work Group Status Overview Accomplishments: 1. March 2012. 10 CFR 851 Workshop was held in conjunction with the 2012 Chemical Management Workshop. 2. Communication tools to enhance 10 CFR 851 Worker Safety and Health Program (WSHP) compliance updated: Requirements checklist distributed across DOE complex and on the 10 CFR 851 website; DOE Guide 440.1-1B to include technical clarifications. Near Term Goals/Activities: 1. Samples of acceptable WSHP programs (including ones based on ISM)

  6. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4/8/14 Facilitator notes in blue May Committee meeting placeholder: Tuesday, May 6 Call placeholder: Tuesday, May 13, 1:30 p.m. June Committee meeting placeholder: Tuesday, June 10 Call placeholder: Tuesday, June 17 August (no committee meetings in July) Committee meeting placeholder: Tuesday, August 5 Call placeholder: Tuesday, August 12, 1:30 p.m. 100-F RI/FS and Proposed Plan Rev 0 (expected to prepare advice for June) Briefing on Long Term Stewardship RCRA Class 3 modifications [August RAP

  7. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2016 Work Plan Working draft - reflects comments received from PIC, HSEP, TWC and RAP committees (updated October 22, 2015) 1 Hanford Advisory Board Draft Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area

  8. TEC Working Group Topic Groups Rail Key Documents Planning Subgroup |

    Office of Environmental Management (EM)

    Department of Energy Planning Subgroup TEC Working Group Topic Groups Rail Key Documents Planning Subgroup Planning Subgroup Rail Planning Timeline (135.57 KB) Benchmarking Project: AREVA Trip Report (651.92 KB) More Documents & Publications TEC Meeting Summaries - July 2007 Evaluation of Shortline Railroads & SNF/HLW Rail Shipment Inspections Tasked for the Transportation of Spent Nuclear Fuel Federal Railroad Administration

  9. Waste Management Committee Fiscal Year 2016 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 6 Work Plan Waste Management Committee Fiscal Year 2016 Work Plan Topics: TA-54 WIPP Recovery Operations Waste Stored at Waste Control Specialists Consent Order Deliverables FY'17 Budget National Waste Forum WM-FY16-WP - March 9, 2016 (107.69

  10. Quality Work Plan Communications Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communications Requirement Quality Work Plan Communications Requirement Graphic of a conversation bubble. The Weatherization Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality home energy upgrades. The plan includes a communication requirement that all WAP Grantees must meet. In this section you will learn more about this requirement and find resources and examples to help you meet this obligation in the field. Requirement Once field standards and

  11. Quality Work Plan Guidelines and Standards Requirement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Guidelines and Standards Requirement Quality Work Plan Guidelines and Standards Requirement an icon of a page The Weatherization Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality home energy upgrades. The plan includes a Guidelines and Standards requirement that all WAP Grantees must meet. In this section you will learn more about this requirement and find resources and examples to help you meet this obligation in the field. Requirement All

  12. WM Committee FY'16 Work Plan

    Office of Environmental Management (EM)

    AT WORK WIPP AT WORK February 1, 2010 - 12:00pm Addthis Carlsbad, NM - Transuranic (TRU) waste cleanup efforts are underway across the DOE complex, as the Waste Isolation Pilot Plant (WIPP) wraps up its 11th year of disposal operations. The Carlsbad Field Office (CBFO) manages the DOE's National TRU Program (NTP) Office and WIPP facility operations. TRU waste temporarily stored at DOE generator sites around the country is shipped to WIPP and disposed in rooms mined out of an ancient salt

  13. Reduced waste generation technical work plan

    SciTech Connect (OSTI)

    Not Available

    1987-05-01

    The United States Department of Energy has established policies for avoiding plutonium losses to the waste streams and minimizing the generation of wastes produced at its nuclear facilities. This policy is evidenced in DOE Order 5820.2, which states Technical and administrative controls shall be directed towards reducing the gross volume of TRU waste generated and the amount of radioactivity in such waste.'' To comply with the DOE directive, the Defense Transuranic Waste Program (DTWP) supports and provides funding for specific research and development tasks at the various DOE sites to reduce the generation of waste. This document has been prepared to give an overview of current and past Reduced Waste Generation task activities which are to be based on technical and cost/benefit factors. The document is updated annually, or as needed, to reflect the status of program direction. Reduced Waste Generation (RWG) tasks encompass a wide range of goals which are basically oriented toward (1) avoiding the generation of waste, (2) changing processes or operations to reduce waste, (3) converting TRU waste into LLW by sorting or decontamination, and (4) reducing volumes through operations such as incineration or compaction.

  14. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2012-07-15

    what future CCC/USDA actions may be necessary, with the ultimate goal of achieving classification of the Sylvan Grove site at no further action status. The proposed activities are to be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory, a nonprofit, multidisciplinary research center operated by the UChicago Argonne, LLC, for the U.S. Department of Energy. Argonne provides technical assistance to the CCC/USDA concerning environmental site characterization and remediation at former grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. That document should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Sylvan Grove.

  15. FY 1999 annual work plan for infrastructure program WBS 6

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  16. Office of Environmental Management Work Planning and Control Oversight |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Office of Environmental Management Work Planning and Control Oversight Office of Environmental Management Work Planning and Control Oversight May 16, 2013 Presenter: Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office Topics Covered: Contractor Good Practices: All contractors evaluate WP&C as part of their CAS URS performing corporate Phase II implementation reviews at sites where they are EM's lead contractor NWP (WIPP contractor) implemented

  17. Final work plan for targeted investigation at Hilton, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2007-08-28

    This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

  18. Proper Sustainability: GAP Grant Proposal Work Plan Strategy Webinar

    Broader source: Energy.gov [DOE]

    In this webinar I will discuss the new GAP grant requirements for tribal environmental programs and strategies for crafting a work plan that focuses on capacity building activities.  My goal is to...

  19. Microsoft Word - Final FY14 EMR Committee Work Plan 093013

    Office of Environmental Management (EM)

    5 Work Plan Approved at the 11/19/2014 NNMCAB Board Meeting Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2015 Work Plan SECTION I MISSION STATEMENT The Northern New Mexico Citizens' Advisory Board's (NNMCAB) Environmental Monitoring and Remediation (EM&R) Committee provides an informed citizen's perspective to the Department of Energy (DOE) on current and future environmental monitoring and remediation activities related to

  20. Microsoft Word - Final FY14 EMR Committee Work Plan 093013

    Office of Environmental Management (EM)

    6 Work Plan Approved at the March 9, 2016 Combined Committee Meeting Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2016 Work Plan SECTION I MISSION STATEMENT The Northern New Mexico Citizens' Advisory Board's (NNMCAB) Environmental Monitoring and Remediation (EM&R) Committee provides an informed citizen's perspective to the Department of Energy (DOE) on current and future environmental monitoring and remediation activities related to

  1. Microsoft Word - FY09 Work Plan_External.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enhancing control systems security in the energy sector NSTB National SCADA Test Bed U.S. Department of Energy Office of Electricity Delivery and Energy Reliability DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan (REVISED 07/31/2009) A plan of work for the National Laboratories that form the National SCADA Test Bed: Argonne National Laboratory Idaho National Laboratory Oak Ridge National Laboratory Pacific Northwest National Laboratory Sandia National Laboratories Fiscal Year 2 0 0 9

  2. 10 CFR 851 Work Group Status Overview - September 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy September 2012 10 CFR 851 Work Group Status Overview - September 2012 Documents Available for Download September 2012 Status Overviews (70.61 KB) More Documents & Publications 10 CFR 851 Work Group Status Overview - July 2012 Focus Group Meeting (Activities Status) Focus Group Meeting (Topical Meeting)

  3. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  4. Final work plan : groundwater monitoring at Morrill, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at Morrill, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Morrill being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Morrill.

  5. Final work plan : groundwater monitoring at Centralia, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2005-08-31

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at the site of a former grain storage facility at Centralia, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Centralia being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Centralia.

  6. The MAJORANA DEMONSTRATOR for 0???: Current status and future plans

    SciTech Connect (OSTI)

    Green, M. P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Abgrall, N. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Aguayo, E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Avignone, III, F. T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of South Carolina, Columbia, SC (United States); Barabash, A. S. [Institute for Theoretical and Experimental Physics, Moscow (Russia); Bertrand, F. E. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Boswell, M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Brudanin, V. [Joint Institute for Nuclear Research, Dubna (Russia); Busch, M. [Duke Univ., Durham, NC (United States); Triange Univ. Nuclear Lab., Durham, NC (United States); Byram, D. [Univ. of South Dakota, Vermillion, SD (United States); Caldwell, A. S. [South Dakota School of Mines and Technology, Rapid CIty, SD (United States); Chan, Y. -D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Christofferson, C. D. [South Dakota School of Mines and Technology, Rapid CIty, SD (United States); Combs, D. C. [North Carolina State Univ., Raleigh, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Cuesta, C. [Univ. of Washington, Seattle, WA (United States); Detwiler, J. A. [Univ. of Washington, Seattle, WA (United States); Doe, P. J. [Univ. of Washington, Seattle, WA (United States); Efremenko, Yu. [Univ. of Tennessee, Knoxville, TN (United States); Egorov, V. [Joint Institute for Nuclear Research, Dubna (Russia); Ejiri, H. [Osaka Univ., Osaka (Japan); Elliott, S. R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Fast, J. E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Finnerty, P. [Univ. of North Carolina, Chapel Hill, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Fraenkle, F. M. [Univ. of North Carolina, Chapel Hill, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Galindo-Uribarri, A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Giovanetti, G. K. [Univ. of North Carolina, Chapel Hill, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Goett, J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Gruszko, J. [Univ. of Washington, Seattle, WA (United States); Guiseppe, V. E. [Univ. of South Carolina, Columbia, SC (United States); Gusev, K. [Joint Institute for Nuclear Research, Dubna (Russia); Hallin, A. L. [Univ. of Alberta, Edmonton, AB (Canada); Hazama, R. [Osaka Univ., Osaka (Japan); Hegai, A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); North Carolina State Univ., Raleigh, NC (United States); Henning, R. [Univ. of North Carolina, Chapel Hill, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Hoppe, E. W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Howard, S. [South Dakota School of Mines and Technology, Rapid CIty, SD (United States); Howe, M. A. [Univ. of North Carolina, Chapel Hill, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Keeter, K. J. [Black Hills State Univ., Spearfish, SD (United States); Kidd, M. F. [Tennessee Tech Univ., Cookeville, TN (United States); Kochetov, O. [Joint Institute for Nuclear Research, Dubna (Russia); Konovalov, S. I. [Institute for Theoretical and Experimental Physics, Moscow (Russia); Kouzes, R. T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); LaFerriere, B. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leon, J. [Univ. of Washington, Seattle, WA (United States); Leviner, L. E. [North Carolina State Univ., Raleigh, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Loach, J. C. [Shanghai Jiao Tong Univ., Shanghai (China); MacMullin, J. [Univ. of North Carolina, Chapel Hill, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); MacMullin, S. [Univ. of North Carolina, Chapel Hill, NC (United States)

    2015-01-01

    The Majorana Demonstrator will search for neutrinoless-double-beta decay (0???) in 76Ge, while establishing the feasibility of a future tonne-scale germanium-based 0??? experiment, and performing searches for new physics beyond the Standard Model. The experiment, currently under construction at the Sanford Underground Research Facility in Lead, SD, will consist of a pair of modular high-purity germanium detector arrays housed inside of a compact copper, lead, and polyethylene shield. Through a combination of strict materials qualifications and assay, low-background design, and powerful background rejection techniques, the Demonstrator aims to achieve a background rate in the 0??? region of interest (ROI) of no more than 3 counts in the 0???-decay ROI per tonne of target isotope per year (cnts/(ROI-t-y)). The current status of the Demonstrator is discussed, as are plans for its completion.

  7. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 24, 2015) 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Informational x x 2. 100 D/H Proposed Plan RAP Informational x x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. 324 Waste Sites RAP Informational 5. 618-10 VPU remediation RAP Informational 6. Central Plateau Inner Area Guidelines RAP Informational x 7. ERDF RAP

  8. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Adopted by the Hanford Advisory Board on 11/5/2015, updated 12/21/15 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview and RAP Issue Manager Assignments) Topic Committee Assignment Issue Managers (lead noted in bold) Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Mattson, Suyama x 2. 100 D/H Proposed Plan RAP Engstrom, Mattson, Garnant, Leckband x 3. 100-N Proposed Plan RAP Cimon, Mattson x 4. Central Plateau Inner Area Guidelines RAP Cimon, Catrell,

  9. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 19, 2015June 18, 2015) 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6. Groundwater updates RAP Project update 7.

  10. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated December 21, 2015 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6. Groundwater updates RAP Project update 7.

  11. Microsoft Word - s05822_LEHR_WorkPlan

    Office of Legacy Management (LM)

    Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 LMS/LEH/S05822-0.0 This page intentionally left blank LMS/LEH/S05822-0.0 Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial

  12. Quality Work Plan Checklist and Resources - Section 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Checklist and Resources - Section 1 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. App Section 15-4 Section Question Yes No Resources V.5.1 1 Are you on track to submit current field guides and standards, including any necessary variance

  13. Quality Work Plan Checklist and Resources - Section 2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Checklist and Resources - Section 2 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. App Section 15-4 Section Checklist Item Yes No V.5.1 2 Have you included language in Subgrantee contracts that clearly documents the SWS specifications and

  14. Quality Work Plan Checklist and Resources - Section 3

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Checklist and Resources - Section 3 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. The first 3 questions do not apply to the territories - instead the fourth question applies. App Section 15-4 Section Question Yes No Resources V.5.3 and/or V.8.3

  15. Quality Work Plan Checklist and Resources - Section 4

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Checklist and Resources - Section 4 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. The last question applies only to Hawaii and the Territories, and the previous 4 questions do not apply to Hawaii and the Territories. App Section 15-4 Section

  16. WIPP Facility Work Plan for Solid Waste Management Units

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  17. WPN 15-4 Quality Work Plan Requirement Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WEATHERIZATION PROGRAM NOTICE 15-4 EFFECTIVE DATE: October 21, 2014 SUBJECT: Quality Work Plan Requirement Update PURPOSE: This guidance provides updates to WPN 14-4 issued December 2, 2013. This guidance supersedes 14-4 and describes requirements to support and verify quality work in the Department of Energy's (DOE) Weatherization Assistance Program (WAP). It defines what constitutes a quality installation of weatherization measures, outlines how those measures are inspected and validated, and

  18. Audience/Panel Discussion: Sites Lesson Learned about Activity-level Work Planning and Control Using EFCOG Work Planning and Control Guideline

    Broader source: Energy.gov [DOE]

    Slide Presentation by Donna J. Governor, Deputy Dept Mgr for Planning & Integration, Lawrence Livermore National Laboratory. Lawrence Livermore National Laboratory work planning and control lessons learned and audience/panel discussion on site's lessons learned about Activity-level Work Planning and Control using EFCOG Work Planning and Control Guideline Document.

  19. Tank waste remediation system multi-year work plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  20. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 05.18.16 *Indicates lead committee 1 Hanford Advisory Board Fiscal Year Draft 2017 Work Plan (FY 2017 Action Overview) Topic Committee Assignment Potential FY 2017 Action/Product Action Q1 Q2 Q3 Q4 1. 100-N Proposed Plan RAP Advice [X] 2. Critical Infrastructure Updates *RAP/HSEP/TWC Advice [X] 3. PFP Progress *RAP/HSEP Agency briefing X 4. Sludge retrieval RAP Agency briefing X 5. WESF preparations to move capsules to dry storage RAP Agency briefing, advice [X] 6. Risk-based retrieval,

  1. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 8/31/2016 * Indicates lead committee 1 Hanford Advisory Board Fiscal Year Draft 2017 Work Plan (FY 2017 Action Overview) Topic Committee Assignment Potential FY 2017 Action/Product Action Q1 Q2 Q3 Q4 1. 100-N Proposed Plan RAP Agency briefing, advice [x] 2. Sludge retrieval RAP Agency briefing x x 3. WESF preparations to move capsules to dry storage RAP Agency briefing, advice [x] 4. River Corridor updates RAP Agency briefing 5. Groundwater updates RAP Agency briefing x x x x 6. Central

  2. WIPP Facility Work Plan for Solid Waste Management Units

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-02-14

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  3. FY 95 engineering work plan for the design reconstitution implementation action plan

    SciTech Connect (OSTI)

    Bigbee, J.D.

    1994-11-09

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities, a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.

  4. Subsurface Site Characterization Work Plan for the Rulison Site, Colorado

    Office of Legacy Management (LM)

    Subsurface Site Characterization Work Plan for the Rulison Site, Colorado Controlled Copy No.: Revision No.: 0 October 2004 Approved for public release; further dissemination unlimited. DOE/NV--1009 Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at

  5. Final work plan : investigation of potential contamination at the former USDA facility in Ramona, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work that will be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Ramona, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential source areas on the property, (2) determine the vertical and horizontal extent of potential contamination, and (3) provide recommendations for future actions, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the United States Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy. Under the Intergovernmental Agreement, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. The Master Work Plan was approved by the KDHE. It contains materials common to investigations at locations in Kansas and should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Ramona.

  6. Current status and future plan of uranium enrichment technology

    SciTech Connect (OSTI)

    Yonekawa, S.; Yamamoto, F.; Yato, Y.; Kishimoto, Y.

    1994-12-31

    The Power Reactor and Nuclear Fuel Development Corporation (PNC) has been conducting extensive research and development (R&D) on the centrifuge process for more than a quarter of a century. This development program, designated as a national project in 1972, has resulted in the construction and operation of a pilot plant with a capacity of 50 t separative work unit (SWU) per year as well as a demonstration plant with a capacity of 200 t SWU/yr. Under the basic agreement of cooperation concluded in 1985, the technology developed in this program has been transferred to Japan Nuclear Fuel Limited (JNFL), which is now constructing and operating the commercial plant with a capacity of 1500 t SWU/yr at Rokkasho, Aomori. This paper describes the operational experiences of the demonstration plant, the status of a new material centrifuge, which will be introduced at a later stage of construction of the commercial plant, the development of an advanced centrifuge as a next-generation machine, and the research of a superadvanced centrifuge.

  7. Lesson Learned by Savannah River Site Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bonnie Barnes, Savannah River Remediation. Work Planning and Control at Savannah River Remediation.

  8. Hanford Advisory Board FY2014 Work Plan - "A" List

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Advisory Board FY2014 Work Plan - "A" List These are the priority topics that the Board is expected to take action on in FY2014, as agreed to by the TPA and the Board. The timing of these topics drives the need for committee meetings. Their status may change to "topics of interest" if they are delayed or deferred, and if there is agreement to do so among the EIC and Agency Liaisons. 8/30/2013 v.6 Page 1 of 11 Priority Topics - "A" List Policy Level Issues

  9. Microsoft Word - 2014_0218_FY2014_HAB_WorkPlan_FINAL-UPDATED.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY2014 Work Plan - "A" List These are the priority topics that the Board is expected to take action on in FY2014, as agreed to by the TPA and the Board. The timing of these topics drives the need for committee meetings. Their status may change to "topics of interest" if they are delayed or deferred, and if there is agreement to do so among the EIC and Agency Liaisons. Adopted by Consensus, September 6, 2013; Updated by consensus 2/18/14 Page 1 of 12 Priority Topics -

  10. Microsoft Word - FY2014_HAB_WorkPlan_v6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Advisory Board FY2014 Work Plan - "A" List These are the priority topics that the Board is expected to take action on in FY2014, as agreed to by the TPA and the Board. The timing of these topics drives the need for committee meetings. Their status may change to "topics of interest" if they are delayed or deferred, and if there is agreement to do so among the EIC and Agency Liaisons. 8/30/2013 v.6 Page 7 of 11 Priority Topics - "A" List Policy Level Issues

  11. In-well vapor stripping drilling and characterization work plan

    SciTech Connect (OSTI)

    Koegler, K.J.

    1994-03-13

    This work plan provides the information necessary for drilling, sampling, and hydrologic testing of wells to be completed in support of a demonstration of the in-well vapor stripping system. The in-well vapor stripping system is a remediation technology designed to preferentially extract volatile organic compounds (VOCs) from contaminated groundwater by converting them to a vapor phase. Air-lift pumping is used to lift and aerate groundwater within the well. The volatiles escaping the aerated water are drawn off by a slight vacuum and treated at the surface while the water is allowed to infiltrate the vadose zone back to the watertable.

  12. Status and Prospects of the Global Automotive Fuel Cell Industry and Plans

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Deployment of Fuel Cell Vehicles and Hydrogen Refueling Infrastructure | Department of Energy and Prospects of the Global Automotive Fuel Cell Industry and Plans for Deployment of Fuel Cell Vehicles and Hydrogen Refueling Infrastructure Status and Prospects of the Global Automotive Fuel Cell Industry and Plans for Deployment of Fuel Cell Vehicles and Hydrogen Refueling Infrastructure This report by Oak Ridge National Laboratory assesses the current status of automotive fuel cell

  13. Office of Enterprise Assessments Targeted Review of Work Planning...

    Office of Environmental Management (EM)

    ... ideas, consider safe solutions to problems, and use the collective experience ... hazmat security plans; and emergency response planning as required in 49 CFR 173. There ...

  14. TWRS privatization phase I - site characterization and environmental baseline work plan

    SciTech Connect (OSTI)

    Reidel, S.P.; Hodges, F.N., Westinghouse Hanford

    1996-08-27

    This work plan defines the steps necessary to develop a Site Characterization Plan and Environmental Baseline for the TWRS Privatization Phase I area. The Data Quality Objectives Process will be the primary tool used to develop these plans.

  15. Interim measure work plan/design for Agra, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2008-11-18

    This Interim Measure Work Plan/Design (IMWP/D) is supplemental to the Argonne document Interim Measure Conceptual Design for Remediation of Source Area Contamination at Agra, Kansas. The IMWP/D includes information required by Kansas Department of Health and Environment (KDHE) Policy BER-RS-029, Policy and Scope of Work for Interim Measures. Specific to Policy BER-RS-029 is the requirement for several documents that will ensure that an adequate amount and type of data are collected for implementation of the IMWP/D and that data quality and safe conditions are prevailed. Such information is included in the IMWP/D as follows: Appendix A: Data Acquisition Plan--Design Testing Requirements; Appendix B: Basis of Design; Appendix C: Permits; Appendix D: Quality Assurance Project Plan; Appendix E: Health and Safety Plan; and Appendix F: Operations, Maintenance, and Monitoring Schedule. The proposed remedial technology for this project is the installation of five large-diameter boreholes (LDBs) in a source area that has been identified on the property formerly used for grain storage by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The goal of the LDB technology is the remediation of the source area by removal of mass quantities of contaminated soil from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. Secondary to the soil remediation is the remediation of groundwater at and adjacent to the source areas. The LDB technology serves the following purposes: (1) The physical removal of contaminated soil from the identified source area. (2) Replacement of less permeable native materials (silty clay, clayey silt, and silty sand) with more permeable materials to facilitate the capture of volatilized contaminants in the vertical borehole. (3) Removal of contaminants volatilized by air sparging (AS) and extracted from the

  16. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  17. The BNL AGS accelerator complex status and future plans

    SciTech Connect (OSTI)

    Tanaka, Mitsuyoshi

    1997-05-01

    This paper describes the present performance and capability of the BNL AGS accelerator complex and possible future intensity upgrade plans. In 1995, the AGS reached its design upgrade goal of 6.0 x 10(exp 13) ppp with the Booster. The AGS with a new fast extracted beam (FEB) system is able to perform single bunch multiple extraction at 30 Hz per AGS cycle for the g-2 experiment and for RHIC injection.

  18. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    SciTech Connect (OSTI)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  19. Technical Work Plan For: Meteorological Monitoring Data Analysis

    SciTech Connect (OSTI)

    R. Green

    2006-02-06

    The meteorological monitoring and analysis program has five objectives. (1) Acquire qualified meteorological data from YMP meteorological monitoring network using appropriate controls on measuring and test equipment. Because this activity is monitoring (i.e., recording naturally occurring events) pre-test predictions are not applicable. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The meteorological monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. (2) Process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. (3) Develop analyses or calculations to provide information to data requesters and provide data sets as requested. (4) Provide precipitation amounts to Site Operations to support requirements to perform inspections in the Stormwater Pollution Prevention Plan (implemented in LP-OM-050Q-BSC) following storm events of greater than 0.5 inches. The program also provides meteorological data during extreme weather conditions (e.g., high winds, rainstorms, etc.) to support decisions regarding worker safety. (5) Collect samples of precipitation for chemical and isotopic analysis by the United States Geological Survey (USGS). The BSC ES&H Environmental Compliance organization is responsible for performing this work. Data from calendar-year periods are submitted to the TDMS to provide YMP users with qualified meteorological data for scientific modeling and analyses, engineering designs of surface facilities, performance assessment analyses, and operational safety issues.

  20. Model assessment of protective barriers: Part 4, Status of FY 1992 work

    SciTech Connect (OSTI)

    Fayer, M.J.

    1993-03-01

    Protective barriers are being considered for use at the Hanford Site to enhance the isolation of radioactive wastes from water, plant, and animal intrusion. This study is part of an ongoing effort to assess the effectiveness of protective barriers for isolation of wastes from water. Part I of this study was the original modeling assessment by Pacific Northwest Laboratory of various protective barrier designs (e.g., soil type, vegetation). In Part 11 of this study, additional barrier designs were reviewed and several barrier modeling assumptions were tested. A test plan was then produced that detailed the requirement for hydrologic modeling of protective barriers. Part III of this study summarized the status of work in FY 1990 dealing with two-dimensional flow beneath the barrier and with validation testing using lysimeter data. This report (Part IV) addresses the application of a calibrated model to a much longer data set, the application of the calibrated model to a lysimeter that received a different treatment, and the effect of hysteresis on the behavior of water in the protective barrier.

  1. US - Brazil Binational Energy Working Group Joint Action Plan...

    Broader source: Energy.gov (indexed) [DOE]

    brazilactionplan7202010.pdf More Documents & Publications U.S.-Brazil Binational Joint Action Plan Webtrends Archives by Fiscal Year - International Activities EIS-0309: Record...

  2. Quality Work Plan Inspection and Monitoring Requirement | Department...

    Energy Savers [EERE]

    to the U.S. Department of Energy meets quality guidelines required by the WAP. The Grantee must provide in their Grantee Plan a policy for validation of the QCI credentials. ...

  3. Liquid effluents program FY 1997 multi-year work plan

    SciTech Connect (OSTI)

    Green, F.T.

    1996-09-30

    This document provides the technical baseline and work breakdown structure for the liquid effluents program.

  4. Site Characterization Work Plan for Gasbuggy, New Mexico

    SciTech Connect (OSTI)

    DOE/NV

    2000-12-14

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities

  5. R&D Plan for the High Temperature Membrane Working Group | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy R&D Plan for the High Temperature Membrane Working Group R&D Plan for the High Temperature Membrane Working Group Summary of challenges, approaches and technical targets for HFCIT's High Temperature Membrane Working Group. htwg_rd_plan.pdf (459.89 KB) More Documents & Publications Table I: Technical Targets for Catalyst Coated Membranes (CCMs): Automotive Table III: Technical Targets for Catalyst Coated Membranes (CCMs): Stationary Table IV: Technical Targets for

  6. Nevada Site Specific Advisory Board Tackles New Work Plans, Looks to Future

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Specific Advisory Board Tackles New Work Plans, Looks to Future Nevada Site Specific Advisory Board Tackles New Work Plans, Looks to Future October 29, 2015 - 12:15pm Addthis NSSAB members get a briefing on groundwater characterization elements during a tour of the Nevada National Security Site. NSSAB members get a briefing on groundwater characterization elements during a tour of the Nevada National Security Site. NSSAB members vote on work plan tasks for fiscal year

  7. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2005-09-26

    This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

  8. Microsoft Word - FY13_EMR_Committee_Work_Plan_Final_Draft

    Office of Environmental Management (EM)

    Approved Sept. 26, 2012 1 Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2013 Work Plan SECTION I. MISSION STATEMENT...

  9. Lesson Learned by Lawrence Livermore National Laboratory Activity-level Work Planning and Control

    Office of Energy Efficiency and Renewable Energy (EERE)

    Slide Presentation by Donna J. Governor, Lawrence Livermore National Laboratory. Lessons Learned by Lawrence Livermore National Laboratory Activity-Level Work Planning & Control.

  10. Papua New Guinea-ClimateWorks Low Carbon Growth Planning Support...

    Open Energy Info (EERE)

    Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policiesdeployment...

  11. Enterprise Assessments Targeted Review of Work Planning and Control...

    Broader source: Energy.gov (indexed) [DOE]

    Management EPC Engineering, Projects, and Construction ESQ Environmental Safety and Quality FR Facility Representative FWS Field Work Supervisor FY Fiscal Year GHA General...

  12. Work plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Not Available

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  13. DOE OIG Recovery Act Work Plan (FY 2011).xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OIG Recovery Act Plan Overview OIG Name: Department of Energy Office of Inspector General OIG Broad Recovery Act Goals: The primary objective of the Office of Inspector General's oversight strategy involves the implementation of a review, evaluation, and investigation protocol designed to assist the Department of Energy in: (1) maximizing the performance and effectiveness of activities related to the Recovery Act; (2) preventing and detecting the fraudulent misuse of Recovery Act funds; and (3)

  14. Lesson Learned by Environmental Management Complex-wide Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Office of Environmental Management Work Planning and Control Oversight. Contractor Good Practices and DOE EM Good Practices.

  15. Guidelines for Process and Development of Annual HAB Work Plan...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    members and agencies, but not timely. Place in holding bin until timely, or use as agenda filler. A new topic is supported by committee members and agencies. Define new work...

  16. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  17. Enterprise Assessments Targeted Review of Work Planning and Control at the Hanford Central Plateau Environmental Remediation Projects- June 2015

    Broader source: Energy.gov [DOE]

    Targeted Review of Work Planning and Control at the Hanford Central Plateau Environmental Remediation Projects

  18. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

  19. 40 CFR 265 interim-status ground-water monitoring plan for the 2101-M pond

    SciTech Connect (OSTI)

    Chamness, M.A.; Luttrell, S.P.; Dudziak, S.

    1989-03-01

    This report outlines a ground-water monitoring plan for the 2101-M pond, located in the southwestern part of the 200-East Area on the Hanford Site in south-central Washington State. It has been determined that hazardous materials may have been discharged to the pond. Installation of an interim-status ground-water monitoring system is required under the Resource Conservation and Recovery Act to determine if hazardous chemicals are moving out of the pond. This plan describes the location of new wells for the monitoring system, how the wells are to be completed, the data to be collected, and how those data can be used to determine the source and extent of any ground-water contamination from the 2101-M pond. Four new wells are planned, one upgradient and three downgradient. 35 refs., 12 figs., 9 tabs.

  20. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    SciTech Connect (OSTI)

    Vigil-Holterman, Luciana R.

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  1. WPN 15-4: Quality Work Plan Requirement Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Quality Work Plan Requirement Update WPN 15-4: Quality Work Plan Requirement Update Effective: Oct. 21, 2014 This guidance provides updates to WPN 14-4 issued Dec. 2, 2013. It supersedes 14-4 and describes requirements to support and verify quality work in the U.S. Department of Energy's (DOE's) Weatherization Assistance Program (WAP). It defines what constitutes a quality installation of weatherization measures, outlines how those measures are inspected and validated, and prescribes

  2. Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development

    Broader source: Energy.gov [DOE]

    Slide Presentation by Rich Davies, Kami Lowry, Mike Schlender, Pacific Northwest National Laboratory (PNNL) and Ted Pietrok, Pacific Northwest Site Office (PNSO). Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development. Work Planning and Control (WP&C) is essential to assuring the safety of workers and the public regardless of the scope of work Research and Development (R&D) activities are no exception.

  3. WPN 15-4: QUALITY WORK PLAN REQUIREMENT UPDATE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5-4: QUALITY WORK PLAN REQUIREMENT UPDATE WPN 15-4: QUALITY WORK PLAN REQUIREMENT UPDATE Effective October 21, 2014: This guidance provides updates to WPN 14-4 issued December 2, 2013. This guidance supersedes 14-4 and describes requirements to support and verify quality work in the Department of Energy's (DOE) Weatherization Assistance Program (WAP). It defines what constitutes a quality installation of weatherization measures, outlines how those measures are inspected and validated, and

  4. Single-shell tank closure work plan. Revision A

    SciTech Connect (OSTI)

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  5. Technical Work Plan For: Meteorological Monitoring and Data Analysis

    SciTech Connect (OSTI)

    C.T. Bastian

    2003-03-28

    The meteorological monitoring and analysis program has three overall objectives. First, the program will acquire qualified meteorological data from monitoring activities in the Environmental Safety and Health (ES&H) network, including appropriate controls on measuring and test equipment. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The continuously operating monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. Second, the program will process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. Third, reports containing analyses or calculations could be created to provide information to data requesters.

  6. DRAFT Letter, PW 1/3/6 RD/RA Work Plan 1/19/16

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Letter, PW 1/3/6 RD/RA Work Plan 1/19/16 RAP Committee: Draft Letter: Remedial Design/Remedial Action (RD/RA) Work Plan for the 200-CW-5, 200- PW-1, PW-3, PW-6 Operable Units, DOE/RL-2015-23 (Draft B). Page 1 of 1 Draft HAB Letter: Remedial Design/Remedial Action (RD/RA) Work Plan for the 200- CW-5, 200-PW-1, PW-3, PW-6 Operable Units, DOE/RL-2015-23 (Draft B). Issue Managers: Engstrom, Hudson, Niles, Cimon, Mattson To: Stacy and Dennis Cc: Ecology and DOE HQ (Monica), Bertrand Recognizing that

  7. DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy OE National SCADA Test Bed Fiscal Year 2009 Work Plan DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan This document is designed to help guide and strengthen the DOE/OE NSTB program's research and development (R&D) of advance security tools and to heighten awareness among energy sector partners of the more than 30 NSTB projects underway in FY2009. DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan (260.95 KB) More Documents & Publications National SCADA Test

  8. Microsoft Word - 2011_1012_RAP_SixMonth_WorkPlan.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 12, 2011 Page 1 of 1 RIVER & PLATEAU COMMITTEE - 6 MONTH WORK PLAN November (No committee meeting) December (1.5 days, 6, 7, 8 flexibility) * Issue manager table update * Site wide permit (IM and Ecology update)/COTW planning * CERCLA Cumulative Risk Assessment * 100-K Proposed Plan (path forward)/ River Corridor Decisions / Insitu Technologies for 100 K Preferred Remedy * 618-10 and 11 Update (include characterization of bottles); presentation * Remediation options for 324 Building

  9. Work plan addendum for the remedial investigation and feasibility study of the Salmon Site

    SciTech Connect (OSTI)

    1995-11-01

    This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of Energy (DOE) is conducting a focused and phased site characterization as a part, of the RI/FS. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) for evaluating hazardous waste sites on the National Priorities List (NPL). The SS is not listed on the NPL, but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA.

  10. Westinghouse Hanford Company Codes and Standards Compliance Program: Fiscal Year 1994 Work Plan. Revision 1

    SciTech Connect (OSTI)

    Moist, S.L.

    1994-05-01

    This FY Work Plan (FYWP) applies to facilities at the Hanford Site under the management of WHC and the Hanford site S/RID. Project management plans will be developed for each facility/activity to document the specific technical and administrative controls for S/RID development and S/R implementation assessments.

  11. Lessons Learned in Optimizing Workers' and Worker Representatives' Input to Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Tom McQuiston, Dr. P.H., United Steelworkers - Tony Mazzocchi Center for Health, Safety and Environmental Education. Lessons Learned in Optimizing Workers’ and Worker Representatives’ Input in Work Planning and Control.

  12. Analysis of ISM Activity-level Work Planning and Control Within...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis of ISM Activity-level Work Planning and Control Within DOE May 15, 2013 Presenter: Stephen L. Domotor, Office of Analysis, Office of Health, Safety and Security Topics ...

  13. Contractor Work Planning and Control Lessons Learned from DOE and International Projects

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bob McQuinn; URS Global Management and Operations Services; Frank McCoy and Rick Runnels; URS - Professional Solutions. Contractor Work Planning and Control-URS Lessons Learned.

  14. 2007 Long Range Plan Working Group Members | U.S. DOE Office of Science

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (SC) 7 Long Range Plan Working Group Members Nuclear Science Advisory Committee (NSAC) NSAC Home Meetings NSAC Members Charges/Reports Charter .pdf file (78KB) NP Committees of Visitors Federal Advisory Committees NP Home NSAC Members 2007 Long Range Plan Working Group Members Print Text Size: A A A FeedbackShare Page Beise, Elizabeth University of Maryland Merninga, Lia TJNAF Bryman, Douglas TRIUMF Meyer, Curtis Carnegie Mellon University Burrows, Adam University of Arizona Meziani,

  15. RFI/RI work plan for the Road A Chemical Basin 904-111G

    SciTech Connect (OSTI)

    Kmetz, T.F.

    2000-03-07

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.

  16. Methodology, status and plans for development and assessment of Cathare code

    SciTech Connect (OSTI)

    Bestion, D.; Barre, F.; Faydide, B.

    1997-07-01

    This paper presents the methodology, status and plans for the development, assessment and uncertainty evaluation of the Cathare code. Cathare is a thermalhydraulic code developed by CEA (DRN), IPSN, EDF and FRAMATOME for PWR safety analysis. First, the status of the code development and assessment is presented. The general strategy used for the development and the assessment of the code is presented. Analytical experiments with separate effect tests, and component tests are used for the development and the validation of closure laws. Successive Revisions of constitutive laws are implemented in successive Versions of the code and assessed. System tests or integral tests are used to validate the general consistency of the Revision. Each delivery of a code Version + Revision is fully assessed and documented. A methodology is being developed to determine the uncertainty on all constitutive laws of the code using calculations of many analytical tests and applying the Discrete Adjoint Sensitivity Method (DASM). At last, the plans for the future developments of the code are presented. They concern the optimization of the code performance through parallel computing - the code will be used for real time full scope plant simulators - the coupling with many other codes (neutronic codes, severe accident codes), the application of the code for containment thermalhydraulics. Also, physical improvements are required in the field of low pressure transients and in the modeling for the 3-D model.

  17. Phase 1 Final status survey plan for the West Valley demonstration project.

    SciTech Connect (OSTI)

    Johnson, R. L.

    2011-05-31

    This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to

  18. Lessons Learned at the Nevada National Security Site Implementing the EFCOG Activity-level Work Planning and Control Guide

    Broader source: Energy.gov [DOE]

    Slide Presentation by Steele Coddington, Work Planning Manager, National Security Technologies, Nevada National Security Site. Lessons Learned Implementing Work Planning & Control. 6 Step Process for improving WP&C.

  19. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    SciTech Connect (OSTI)

    Pentecost, E.D.; Vinikour, W.S.

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods.

  20. R&D Plan for the High Temperature Membrane Working Group

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    R&D Plan for the High Temperature Membrane Working Group Introduction/Background The High Temperature Membrane Working Group was established to provide a forum for greater interaction in the effort to develop high temperature membranes for PEM fuel cells. The goal of this effort is particularly challenging and requires significant fundamental research and development. The Working Group meets twice a year (immediately before or after the Electrochemical Society meeting) and includes

  1. September 2012, HSS Focus Group Strategic Initiatives Work Group...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Initiatives Work Group Status Overview Accomplishments: 1. June 26. Telecom with ... reporting improvements are planned for the next Strategic Initiatives Work Group meeting. ...

  2. The MAJORANA DEMONSTRATOR for 0νββ: Current Status and Future Plans

    SciTech Connect (OSTI)

    Green, M. P.; Abgrall, N.; Aguayo, Estanislao; Avignone, Frank T.; Barabash, Alexander; Bertrand, F.; Boswell, M.; Brudanin, V.; Busch, Matthew; Byram, D.; Caldwell, A. S.; Chan, Yuen-Dat; Christofferson, Cabot-Ann; Combs, Dustin C.; Cuesta, C.; Detwiler, Jason A.; Doe, P. J.; Efremenko, Yuri; Egorov, Viatcheslav; Ejiri, H.; Elliott, S. R.; Fast, James E.; Finnerty, P.; Fraenkle, Florian; Galindo-Uribarri, A.; Giovanetti, G. K.; Goett, J.; Gruszko, J.; Guiseppe, Vincente; Gusev, K.; Hallin, A. L.; Hazama, R.; Hegai, A.; Henning, Reyco; Hoppe, Eric W.; Howard, Stanley; Howe, M. A.; Keeter, K.; Kidd, M. F.; Kochetov, Oleg; Konovalov, S.; Kouzes, Richard T.; Laferriere, Brian D.; Leon, Jonathan D.; Leviner, L.; Loach, J. C.; MacMullin, J.; MacMullin, S.; Martin, R. D.; Meijer, S. J.; Mertens, S.; Nomachi, Masaharu; Orrell, John L.; O'Shaughnessy, Mark D.; Overman, Nicole R.; Phillips, David; Poon, Alan; Pushkin, K.; Radford, D. C.; Rager, J.; Rielage, Keith; Robertson, R. G. H.; Romero-Romero, E.; Ronquest, M. C.; Schubert, Alexis G.; Shanks, B.; Shima, T.; Shirchenko, M.; Snavely, Kyle J.; Snyder, N.; Suriano, Anne-Marie; Thompson, J.; Timkin, V.; Tornow, Werner; Trimble, J. E.; Varner, R. L.; Vasilyev, Sergey; Vetter, Kai; Vorren, Kris R.; White, Brandon R.; Wilkerson, J. F.; Wiseman, C.; Xu, W.; Yakushev, E.; Young, A.; Yu, Chang-Hong; Yumatov, Vladimir

    2015-03-24

    The Majorana Demonstrator will search for neutrinoless-double-beta decay in 76Ge, while establishing the feasibility of a future tonne-scale germanium-based neutrinoless-double-beta decay experiment, and performing searches for new physics beyond the Standard Model. The experiment, currently under construction at the Sanford Underground Research Facility in Lead, SD, will consist of a pair of modular high-purity germanium detector arrays housed inside of a compact copper, lead, and polyethylene shield. Through a combination of strict materials qualifications and assay, low-background design, and powerful background rejection techniques, the Demonstrator aims to achieve a background rate in the neutrinoless-double-beta decay region of interest (ROI) of no more than 3cnts/(ROI-t-y). The current status of the Demonstrator is discussed, as are plans for its completion.

  3. Status and Plans for an SRF Accelerator Test Facility at Fermilab

    SciTech Connect (OSTI)

    Church, M.; Leibfritz, J.; Nagaitsev, S.; /Fermilab

    2011-07-29

    A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and multiple downstream beam lines for testing diagnostics and performing beam experiments. With 3 cryomodules installed this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. The facility can accommodate up to 6 cryomodules for a total beam energy of 1.5 GeV. This facility will be used to test SRF cryomodules under high intensity beam conditions, RF power equipment, instrumentation, and LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

  4. The Majorana Demonstrator for 0vBB: Current Status and Future Plans

    SciTech Connect (OSTI)

    Green, Matthew P; Avignone, F. T.; Galindo-Uribarri, Alfredo {nmn}; Radford, David C; Romero-Romero, Elisa; Varner Jr, Robert L; White, Brandon R; Wilkerson, J. F.; Majorana,

    2015-01-01

    The Majorana Demonstrator will search for neutrinoless-double-beta decay (0 ) in 76Ge, while establishing the feasibility of a future tonne-scale germanium-based 0 experiment, and performing searches for new physics beyond the Standard Model. The experiment, currently under construction at the Sanford Underground Research Facility in Lead, SD, will consist of a pair of modular high-purity germanium detector arrays housed inside of a compact copper, lead, and polyethylene shield. Through a combination of strict materials qualifications and assay, low-background design, and powerful background rejection techniques, the Demonstrator aims to achieve a background rate in the 0 region of interest (ROI) of no more than 3cnts/(ROI-t-y). The current status of the Demonstrator is discussed, as are plans for its completion.

  5. The RHIC and RHIC pre-injectors controls systems: status and plans

    SciTech Connect (OSTI)

    Brown, K.A.; Altinbas, Z.; Aronson, J.; Binello, S.; Campbell, I.; Costanzo, M.; D

    2011-10-10

    For the past twelve years experiments at the Relativistic Heavy Ion Collider (RHIC) have recorded data from collisions of heavy ions and polarized protons, leading to important discoveries in nuclear physics and the spin dynamics of quarks and gluons. BNL is the site of one of the first and still operating alternating gradient synchrotrons, the AGS, which first operated in 1960. The accelerator controls systems for these instruments span multiple generations of technologies. In this report we will describe the current status of the Collider-Accelerator Department controls systems, which are used to control seven different accelerator facilities and multiple science programs (high energy nuclear physics, high energy polarized proton physics, NASA programs, isotope production, and multiple accelerator research and development projects). We will describe the status of current projects, such as the just completed Electron Beam Ion Source (EBIS), our R&D programs in superconducting RF and an Energy Recovery LINAC (ERL), innovations in feedback systems and bunched beam stochastic cooling at RHIC, and plans for future controls system developments.

  6. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-12-22

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  7. WPN 14-4: Quality Work Plan Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Archived 10/21/14, Superseded by WPN 15-4 This guidance describes requirements to support and verify quality work in the U.S. Department of Energy (DOE) Weatherization Assistance Program (WAP). It defines what constitutes a quality installation of weatherization measures, outlines how those measures are inspected and validated, and defines acceptable training and credentialing of workers. WPN 14-4: Quality Work Plan Requirement (592.96

  8. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    SciTech Connect (OSTI)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan.

  9. Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

    SciTech Connect (OSTI)

    Gregory Weatherby

    2012-05-01

    The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage

  10. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site.

  11. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    SciTech Connect (OSTI)

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  12. Work plan addendum for David Witherspoon, Inc., 901 Site Building Characterization, Knoxville, Tennessee

    SciTech Connect (OSTI)

    1997-01-01

    This building characterization plan was developed as an addendum to the existing site characterization work plan documents, which are in Appendix B of the David Witherspoon, Inc., (DWI) preliminary remedial investigation (RI)/feasibility study (FS). All building characterization activities will be conducted in accordance with the rules of the Hazardous Substance Remedial Action Program under the direction of the Tennessee Department of Environment and Conservation, Division of Superfund (TN Rules 1200-1-3) and its implementing regulations. Additional rules of the state of Tennessee, Comprehensive Environmental Response, Compensation, and Liability Act of 1980, and the U.S. Environmental Protection Agency guidance were consulted during development of this plan. Activities at the DWI site were concerned with scrap metal processing and scrap metal resale.

  13. Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab

    SciTech Connect (OSTI)

    Leibfritz, J.; Andrews, R.; Baffes, C.M.; Carlson, K.; Chase, B.; Church, M.D.; Harms, E.R.; Klebaner, A.L.; Kucera, M.; Martinez, A.; Nagaitsev, S.; /Fermilab

    2012-05-01

    The Advanced Superconducting Test Accelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750 MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

  14. The MAJORANA DEMONSTRATOR for 0νββ: Current status and future plans

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Green, M. P.; Abgrall, N.; Aguayo, E.; Avignone, III, F. T.; Barabash, A. S.; Bertrand, F. E.; Boswell, M.; Brudanin, V.; Busch, M.; Byram, D.; et al

    2015-01-01

    The Majorana Demonstrator will search for neutrinoless-double-beta decay (0νββ) in 76Ge, while establishing the feasibility of a future tonne-scale germanium-based 0νββ experiment, and performing searches for new physics beyond the Standard Model. The experiment, currently under construction at the Sanford Underground Research Facility in Lead, SD, will consist of a pair of modular high-purity germanium detector arrays housed inside of a compact copper, lead, and polyethylene shield. Through a combination of strict materials qualifications and assay, low-background design, and powerful background rejection techniques, the Demonstrator aims to achieve a background rate in the 0νββ region of interest (ROI) of nomore » more than 3 counts in the 0νββ-decay ROI per tonne of target isotope per year (cnts/(ROI-t-y)). The current status of the Demonstrator is discussed, as are plans for its completion.« less

  15. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-03-05

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  16. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-03-05

    his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to

  17. Engineering work plan for tank 241-C-103 vapor phase characterization (ECN 613188). Revision 1

    SciTech Connect (OSTI)

    Conrad, R.B.

    1994-10-05

    The tasks described by this work plan have been completed. The purpose of this revision it to document what actually occurred during the performance of this work plan. The scope was and is limited to phases 1 and 2 as described in the program plan, revision 1. Phases 1 and 2 include the tank 241-C-103 (C-103) vapor. For economic and as low as reasonably achievable (ALARA) reasons, we will limit our scope to characterize the C-103 vapor phase for the categories that could be expected to impact facility worker safety from a toxicological and flammability standpoint. In anticipation that a vapor treatment system may be required, categories necessary for design will also be included. It will be the intent of the C-103 vapor characterization program to: (1) identify the substances from the above list of categories that are applicable to the issues involving C-103, and (2) implement a phased plan which will develop the organic vapor phase characterization method and then characterize the organics and the other selected substances to the required quantitative certainty.

  18. Proceedings of the North Aleutian Basin information status and research planning meeting.

    SciTech Connect (OSTI)

    LaGory, K. E.; Krummel, J. R.; Hayse, J. W.; Hlohowskyj, I.; Stull, E. A.; Gorenflo, L.; Environmental Science Division

    2007-10-26

    gathering of relevant literature; (2) synthesis and summary of the literature; and (3) identification and prioritization of information needs. To assist in gathering this information, MMS convened the North Aleutian Basin Information Status and Research Planning Meeting, held in Anchorage, Alaska, from November 28 through December 1, 2006; this report presents a summary of that meeting. The meeting was the primary method used to gather input from stakeholders and identify information needs and priorities for future inventory, monitoring, and research related to potential leasing and oil and gas developments in the North Aleutian Basin.

  19. Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan

    SciTech Connect (OSTI)

    Nielsen, T. ); Waage, E.; Miller, D. Corp., Boulder, CO )

    1990-01-01

    The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

  20. Microsoft Word - 2014_1008_TWC_ThreeMonth_WorkPlan.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10/8/14 Facilitator notes in blue November Committee meeting placeholder: Thursday, November 13 Call placeholder: Tuesday, November 18, 3:00 p.m. December Committee meeting placeholder: Wednesday, December 10 Call placeholder: Tuesday, December 16, 3:00 p.m. January Committee meeting placeholder: Wednesday, January 7 Call placeholder: Tuesday, January 13, 3:00 p.m. Tank Farm Vapor Issues (joint with HSEP) Direct Feed LAW HOLDING BIN Topic On HAB 2014 Work Plan? Timeframe? Alternative vessel

  1. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  2. The DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion

    SciTech Connect (OSTI)

    Gerdes, Kurt D.; Han, Ana M.; Marra, James C.; Fox, Kevin M.; Peeler, David K.; Smith, Michael E.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A. S.; Stefanovsky, S. V.; Bondarkov, M. D.; Lopukh, D. P.; Kim, Chenwoo

    2009-01-15

    The DOE-EM Office of Engineering and Technology is responsible for implementing EM’s international cooperative program. The Office of Engineering and Technology’s international efforts are aimed at supporting EM’s mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute (KRI) and the SIA Radon Institute in Russia and the Ukraine’s International Radioecology Laboratory (IRL). Additionally, a task was recently completed with the Nuclear Engineering Technology Institute (NETEC) in South Korea. The objectives of these collaborations were to explore issues relating to high-level waste and to investigate technologies that could be leveraged to support EM site cleanup needs. In FY09, continued collaboration with the current partners is planned. Additionally, new research projects are being planned to expand the International Program. A collaborative project with Russian Electrotechnical University is underway to evaluate CCIM control and monitoring technologies. A Statement of Intent was recently signed between DOE-EM and the U.K. Nuclear Decommissioning Authority (NDA) to work cooperatively on areas of mutual interest. Under this umbrella, discussions were held with NDA representatives to identify potential areas for collaboration. Information and technical exchanges were identified as near-term actions to help meet the objectives of the Statement of Intent. Technical exchanges in identified areas are being pursued in FY09

  3. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    SciTech Connect (OSTI)

    SCHULTZ, E.A.

    1998-10-01

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  4. Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection

    SciTech Connect (OSTI)

    NONE

    1995-08-01

    The continuous collection of groundwater data is a basic and necessary part of Lockeheed Martin Energy Systems` ORNL Environmental Restoration Area-Wide Groundwater Program. Continuous groundwater data consist primarily of continually recorded groundwater levels, and in some instances, specific conductivity, pH, and/or temperature measurements. These data will be collected throughout the ORNL site. This Work Plan (WP) addresses technical objectives, equipment requirements, procedures, documentation requirements, and technical instructions for the acquisition of the continuous groundwater data. Intent of this WP is to provide an approved document that meets all the necessary requirements while retaining the flexibility necessary to effectively address ORNL`s groundwater problems.

  5. Microsoft Word - 2014_0305_Graphic_PIC_ThreeMonth_WorkPlan.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    03/05/14 during PIC meeting (Blue titles indicate those topics specifically identified in the 2014 HAB Work Plan) March April May RAD Primer (placeholder) o How workers are protected from exposure? o HSEP lead Public Understanding of... o Involving an informed public on issues like cleanup levels, waste streams and classifications, risk, budget, etc. o Check in with John Howieson & other issue managers on the tank waste classification FAQs (next step: Ken & Liz to set-up IM call) 100-F

  6. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    SciTech Connect (OSTI)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  7. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    SciTech Connect (OSTI)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  8. Site Specific Single Shell Tank (SST) phase 1 RFI and CMS Work Plan Addendum for Waste Management B-BX-BY

    SciTech Connect (OSTI)

    ROGERS, P.M.

    2000-05-19

    This site-specific work plan addendum for WMA B-BX-BY addresses vadose zone characterization plans for collecting and analyzing sediment samples.

  9. Environmental Programs: Status of Work and Current Priorities for FY13

    SciTech Connect (OSTI)

    Jones, Patricia

    2012-08-17

    Presentation outline is: Mission/overview, Regulatory framework, Current status of cleanup, Shift in priorities to address highest risk, Removal of above-ground waste, Continued focus on protecting water resources, and Priorities for fiscal year 2013. LANL's Environmental Mission is to: (1) Repack and ship legacy transuranic waste containers; (2) Investigate and remediate Cold War (legacy) hazardous and radioactive waste areas; (3) Demolish unused buildings; (4) Disposition solid waste from Laboratory operations; and (5) Lifecycle cost nearly $3 billion.

  10. Status and future plans for the Mark II detector at SLAC

    SciTech Connect (OSTI)

    Perl, M.L.

    1983-04-01

    In this brief talk, I report on three subjects. First the present status of PEP, where there has been a very large increase in the luminosity in the past five months. Next, the present status of the Mark II detector, whose secondary vertex detector constitutes a very important part of the physics which our collaboration is doing at PEP. Finally, I review the design of the upgraded Mark II Detector which will be used at the Stanford Linear Collider (SLC).

  11. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

  12. Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1995-08-01

    US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure.

  13. Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2

    SciTech Connect (OSTI)

    Dail, J.L.; Nanstad, L.D.; White, R.K.

    1995-06-01

    This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ``scores`` and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process.

  14. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    SciTech Connect (OSTI)

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  15. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains a discussion of the chemical safety improvements planned or already underway at DOE sites to correct facility or site-specific vulnerabilities. The main part of the report is a discussion of each of the programmatic deficiencies; a description of the tasks to be accomplished; the specific actions to be taken; and the organizational responsibilities for implementation.

  16. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    SciTech Connect (OSTI)

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  17. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    SciTech Connect (OSTI)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  18. The Removal Action Work Plan for CPP-603A Basin Facility

    SciTech Connect (OSTI)

    B. T. Richards

    2006-06-05

    This revised Removal Action Work Plan describes the actions to be taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The regulatory framework outlined in this Removal Action Work Plan has been modified from the description provided in the Engineering Evaluation/Cost Analysis (DOE/NE-ID-11140, Rev. 1, August 2004). The modification affects regulation of sludge removal, treatment, and disposal, but the end state and technical approaches have not changed. Revision of this document had been delayed until the basin sludge was successfully managed. This revision (Rev. 1) has been prepared to provide information that was not previously identified in Rev. 0 to describe the removal, treatment, and disposal of the basin water at the Idaho National Laboratory (INL) CERCLA Disposal Facility evaporation ponds and fill the basins with grout/controlled low strength material (CLSM) was developed. The Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center - conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act - evaluated risks associated with deactivation of the basins and alternatives for addressing those risks. The decision to remove and dispose of the basin water debris not containing uranium grouted in place after the sludge has been removed and managed under the Hazardous Waste Management Act/Resource Conservation and Recovery Act has been documented in the Act Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center.

  19. Status report of advanced cladding modeling work to assess cladding performance under accident conditions

    SciTech Connect (OSTI)

    B.J. Merrill; Shannon M. Bragg-Sitton

    2013-09-01

    Scoping simulations performed using a severe accident code can be applied to investigate the influence of advanced materials on beyond design basis accident progression and to identify any existing code limitations. In 2012 an effort was initiated to develop a numerical capability for understanding the potential safety advantages that might be realized during severe accident conditions by replacing Zircaloy components in light water reactors (LWRs) with silicon carbide (SiC) components. To this end, a version of the MELCOR code, under development at the Sandia National Laboratories in New Mexico (SNL/NM), was modified by replacing Zircaloy for SiC in the MELCOR reactor core oxidation and material properties routines. The modified version of MELCOR was benchmarked against available experimental data to ensure that present SiC oxidation theory in air and steam were correctly implemented in the code. Additional modifications have been implemented in the code in 2013 to improve the specificity in defining components fabricated from non-standard materials. An overview of these modifications and the status of their implementation are summarized below.

  20. Status of data, major results, and plans for geophysical activities, Yucca Mountain Project

    SciTech Connect (OSTI)

    Oliver, H.W.; Hardin, E.L.; Nelson, P.H.

    1990-07-01

    This report describes past and planned geophysical activities associated with the Yucca Mountain Project and is intended to serve as a starting point for integration of geophysical activities. This report relates past results to site characterization plans, as presented in the Yucca Mountain Site Characterization Plan (SCP). This report discusses seismic exploration, potential field methods, geoelectrical methods, teleseismic data collection and velocity structural modeling, and remote sensing. This report discusses surface-based, airborne, borehole, surface-to-borehole, crosshole, and Exploratory Shaft Facility-related activities. The data described in this paper, and the publications discussed, have been selected based on several considerations; location with respect to Yucca Mountain, whether the success or failure of geophysical data is important to future activities, elucidation of features of interest, and judgment as to the likelihood that the method will produce information that is important for site characterization. 65 refs., 19 figs., 12 tabs.

  1. Engineering work plan for implementing the Process Condensate Recycle Project at the 242-A evaporator

    SciTech Connect (OSTI)

    Haring, D.S.

    1995-02-02

    The 242-A Evaporator facility is used to reduce the volume of waste stored in the Hanford double shell tanks. This facility uses filtered raw water for cooling, de-entrainment pad sprays, pump seal water, and chemical tank make-up. Some of these uses result in the introduction of filtered raw water into the process, thus increasing the volume of waste requiring evaporation and subsequent treatment by the 200 East Effluent Treatment Facility. The pump seal water and the de-entrainment pad spray systems were identified as candidates for a waste minimization upgrade. This work plan describes the activities associated with the design, installation, testing and initial operation of the process condensate recycle system. Implementation of the process condensate recycle system will permit the use of process condensate in place of raw water for the de-entrainment pad sprays and pump seals. This will reduce the amount of low-level liquid waste and generated during facility operation through source reduction and recycling.

  2. Operable Unit 7-13/14 in situ thermal desorption treatability study work plan

    SciTech Connect (OSTI)

    Shaw, P.; Nickelson, D.; Hyde, R.

    1999-05-01

    This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.

  3. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

  4. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards.

  5. 40 CFR 265 interim status indicator-evaluation ground-water monitoring plan for the 216-B-63 trench

    SciTech Connect (OSTI)

    Bjornstad, B.N.; Dudziak, S.

    1989-03-01

    This document outlines a ground-water monitoring plan for the 216-B-63 trench located in the northeast corner of the 200-East Area on the Hanford Site in southeastern Washington State. It has been determined that hazardous materials (corrosives) were disposed of to the trench during past operations. Installation of an interim-status ground-water monitoring system is required to determine whether hazardous chemicals are leaching to the ground water from beneath the trench. This document summarizes the existing data that are available from near the 216-B-63 trench and presents a plan to determine the extent of ground-water contamination, if any, derived from the trench. The plan calls for the installation of four new monitoring wells located near the west end of the trench. These wells will be used to monitor ground-water levels and water quality immediately adjacent to the trench. Two existing RCRA monitoring wells, which are located near the trench and hydraulically upgradient of it, will be used as background wells. 46 refs., 15 figs., 12 tabs.

  6. Operational Status and Life Extension Plans for the Los Alamos Neutron Science Center (LANSCE)

    SciTech Connect (OSTI)

    Erickson, John L.; Rees, Daniel E.

    2011-01-01

    The Los Alamos Neutron Science Center (LANSCE) accelerator and beam delivery complex generates the proton beams that serve three neutron production sources, a proton radiography facility and a medical and research isotope production facility. The recent operating history of the facility, including both achievements and challenges, will be reviewed. Plans for performance improvement will be discussed, together with the underlying drivers for the ongoing LANSCE Linac Risk Mitigation (LRM) project. The details of this latter project will also be discussed.

  7. Project W-236A, work plan for preparation of a design requirements document

    SciTech Connect (OSTI)

    Groth, B.D.

    1995-01-30

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project`s link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD.

  8. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River.

  9. Site Characterization Work Plan for Gnome-Coach Site, New Mexico

    SciTech Connect (OSTI)

    DOE /NV

    2001-02-13

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective

  10. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office

    2002-01-14

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.