Powered by Deep Web Technologies
Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Presentation to the EAC - Smart Grid Subcommittee Work Plan Status...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Advisory Committee Smart Grid Subcommittee Work Plan Status Joe Paladino - DOE Wanda Reder - EAC Smart Grid Sub- Committee Chair June 12, 2012 * Considerations: - Build...

2

Presentation to the EAC - Smart Grid Subcommittee Work Plan Status - Joe Paladino & Wanda Reder  

Broader source: Energy.gov (indexed) [DOE]

Smart Grid Subcommittee Smart Grid Subcommittee Work Plan Status Joe Paladino - DOE Wanda Reder - EAC Smart Grid Sub- Committee Chair June 12, 2012 * Considerations: - Build from resulting from ARRA SGIG/SGDP project results that were awarded ~two years ago - EAC Smart Grid Sub-Committee role defined in the 2007 Energy Independence and Security Act * Approach: - Met with DOE in January 2012, May 2012 - Conference calls and iterations with Committee and DOE staff - Participated in Peer Review - Build upon DOE activity underway * Philosophy: - Work closely with DOE staff to find ways for EAC to add value - User priorities to focus efforts throughout 2012 2012 Smart Grid Work Plan Approach SGIG Spending EPRI Estimate Brattle Group Estimate $7.9 billion with cost share to be spent through 2015

3

Status Update on Action 2a: Implementation Handbook for Activity-level Work Planning and Control  

Broader source: Energy.gov [DOE]

Slide Presentation by James Winter, NA-00-10. DOE Handbook: Implementing Activity-Level Work Planning & Control at Nuclear Facilities. Project Justification Statement submitted 1-29-13, with focus upon improved implementation of WP&C and activity-level work. Provides the background, project plan, and key elements of a new DOE handbook on implementing activity-level work planning and control at DOE nuclear facilities.

4

2011 University of Vermont Combined Research and Extension Plan of Work Status: Submitted  

E-Print Network [OSTI]

Extension address issues ranging from farm profitability, water and soil quality, and dairy herd disease resistance and health, to global climate change, renewable energy, youth life skills education, community and adult life-skills development. Our work is guided and evaluated by dedicated citizen advisors

Hayden, Nancy J.

5

ESnet Planning, Status,  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ESnet Planning, Status, ESnet Planning, Status, and Future Issues William E. Johnston, ESnet Department Head and Senior Scientist Joe Burrescia, General Manager Mike Collins, Chin Guok, and Eli Dart, Engineering Brian Tierney, Advanced Development Jim Gagliardi, Operations and Deployment Stan Kluz, Infrastructure and ECS Mike Helm, Federated Trust Dan Peterson, Security Officer Gizella Kapus, Business Manager and the rest of the ESnet Team wej@es.net, this talk is available at www.es.net Energy Sciences Network Lawrence Berkeley National Laboratory Networking for the Future of Science ASCAC, August 2008 2 DOE Office of Science and ESnet - the ESnet Mission * ESnet is an Office of Science ("SC") facility in the Office of Advanced Scientific Computing Research ("ASCR")

6

CFN Ops Plan | Work Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

7

WRAP process area development control work plan  

SciTech Connect (OSTI)

This work plan defines the manner in which the Waste Receiving and Processing Facility, Module I Process Area will be maintained under development control status. This status permits resolution of identified design discrepancies, control system changes, as-building of equipment, and perform modifications to increase process operability and maintainability as parallel efforts. This work plan maintains configuration control as these efforts are undertaken. This task will end with system testing and reissue of field verified design drawings.

Leist, K.L., Fluor Daniel Hanford

1997-02-27T23:59:59.000Z

8

Mon Valley work plan  

Office of Legacy Management (LM)

GWSHP 1.8 GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for Characterization Activities at the Shiprock UMTRA Project Site June 1998 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number UGW-511-0020-01-000 Document Number U0013400 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0013400 Contents DOE/Grand Junction Office Work Plan for Characterization Activities at Shiprock Project Site June 1998 Draft Final Page v Contents Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.0 Introduction .

9

CRAD, Work Controls Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Work Controls Assessment Plan Work Controls Assessment Plan CRAD, Work Controls Assessment Plan Performance Objective: Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed. Criteria: Work planning addresses applicable laws, codes and regulations. Work planning includes operational configuration constraints; material, tool, and manpower requirements; inter-organizational coordination; operational history; special training; safety considerations; hazards protection requirements; post-maintenance testing; quality control requirements; and other considerations as necessary. The work to be accomplished is defined by identifying the existing deficiency and condition; prescribing appropriate approvals; and including

10

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL  

Office of Legacy Management (LM)

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community Improvement Corporation 720 Mound Road Miamisburg, Ohio 45342-6714 Dear Mr. Bird: The Core Team, consisting of the U.S. Department of Energy Miamisburg Environmental Management Project (DOE-MEMP), U.S. Environmental Protection Agency (USEPA), and the Ohio Environmental Protection Agency (OEPA), appreciates your comments on the Work

11

Status Update on Action 2c: Criteria Review and Approach Document (CRAD) for Performing Assessments of Activity-level Work Planning and Control  

Broader source: Energy.gov [DOE]

Slide Presentation by Bradley K. Davy, Director, Office of Worker Safety and Health Assistance, HS. Criteria Review and Approach Document (CRAD) for Performing Assessments of Activity- Level Work Planning and Control. DOE CRAD Development Approach.

12

Intermediate Ethanol Blends: Plans and Status | Department of...  

Energy Savers [EERE]

Intermediate Ethanol Blends: Plans and Status Intermediate Ethanol Blends: Plans and Status Presentation from the U.S. DOE Office of Vehicle Technologies "Mega" Merit Review 2008...

13

Waste Isolation Pilot Plant Status and Plans - 2010 | Department...  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Status and Plans - 2010 Waste Isolation Pilot Plant Status and Plans - 2010 Overview of WIPP presented by Dr. Dave Moody. Waste Isolation Pilot Plant...

14

FY 1987 current fiscal year work plan  

SciTech Connect (OSTI)

This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

Not Available

1986-12-01T23:59:59.000Z

15

Work Plans & Manuals | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Work Plans & Manuals Work Plans & Manuals This list contains audit and inspections manuals and a list of planned reviews to be conducted by the Office of Audits and Inspections....

16

CMS: Present status, limitations, and upgrade plans  

SciTech Connect (OSTI)

An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R&D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

Cheung, H.W.K.; /Fermilab; ,

2011-09-01T23:59:59.000Z

17

Quality Work Plan Inspection and Monitoring Requirement  

Broader source: Energy.gov [DOE]

Inspection and monitoring requirements for Weatherization Assistance Program's comprehensive Quality Work Plan.

18

PUREX facility preclosure work plan  

SciTech Connect (OSTI)

This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D).

Engelmann, R.H.

1997-04-24T23:59:59.000Z

19

July 2012, Work Force Retention Work Group Status Overview  

Broader source: Energy.gov (indexed) [DOE]

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - anticipated completion no later than September, assuming timely OMB review and approval. 2. Draft PF Working Group charter final review by senior management to be

20

Work Force Planning for Public Power Utilities  

E-Print Network [OSTI]

Work Force Planning for Public Power Utilities: Ensuring Resources to Meet Projected Utilities Need to Do More to Prepare for Their Future Work Force Needs.............................................................................20 #12;ii Work Force Planning for Public Power Utilities #12;1 Work Force Planning for Public Power

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

RAP Committee 3-Month Work Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(where does this fit into the HAB FY2014 Work Plan?) Update on 100-N RIFS and Proposed Plan Rev 0; advice development o Review of recommendations of proposed plans o Draft A ...

22

Work Controls Assessment Plan Assessment Plan Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Broader source: Energy.gov (indexed) [DOE]

WORK CONTROLS WORK CONTROLS Assessment Plan Developed By NNSA/Nevada Site Office Facility Representative Division Performance Objective: Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed. Criteria: Work planning addresses applicable laws, codes and regulations. Work planning includes operational configuration constraints; material, tool, and manpower requirements; inter-organizational coordination; operational history; special training; safety considerations; hazards protection requirements; post-maintenance testing; quality control requirements; and other considerations as necessary. The work to be accomplished is defined by identifying the existing

23

Intermodal Subgroup Draft Work Plan2  

Broader source: Energy.gov (indexed) [DOE]

1 of 2 Work Plan for the DOE TEC Rail Topic Group Intermodal Sub-Group Status: Active Chair: Melissa Bailey (CSG-NE) DOE Lead: Alex Thrower (OCRWM) Contractor Support: John Smegal (Legin) Start Date: July 17, 2007 Purpose: The purpose of the Transportation External Coordinating (TEC) Working Group's Rail Topic Group (RTG) is to provide stakeholder perspectives and feedback to the Office of National Transportation (ONT) in the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) and Environmental Management (EM) regarding topics of common interest concerning operating practices, logistical constraints, and other rail-related issues affecting the development and deployment of a safe, secure, and efficient system for transporting spent fuel (SNF) and high-level radioactive waste (HLW) to a

24

September 2012, Work Force Retention Work Group Status Overview  

Broader source: Energy.gov (indexed) [DOE]

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 [Protective Force Personnel Medical, Physical Readiness, Training, and Access Authorization Standards] as a final rule that includes modification efforts to address barriers to workforce retention. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - publication anticipated this month.

25

July 2012, Training Work Group Status Overview  

Broader source: Energy.gov (indexed) [DOE]

Training Work Group Status Overview Training Work Group Status Overview Accomplishments: 1. May 7 - 8. Attended NIEHS Trainer's Exchange in Oak Ridge . 2. May 8 - 9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker Pilot. 3. June 19-20. Joined Char Wells at Sandia (with NIEHS and HAMMER) for the Learning/Training Workshop. 2. NTC offered support for Data Warehousing at the Learning/Training Workshop. 3. Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business Management Working Group. 4. June 20 - 21. Hosted HAMMER to develop Radworker Reciprocity Program Checklist. 5. July 10-11. HSS Focus Group Training Working Group and Subcommittee meetings at NTC. Upcoming Meetings: Boardman meeting with HAMMER week of July 29.

26

MMCR Upgrades: Present Status and Future Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MMCR Upgrades: Present Status and Future Plans MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital signal processor that significantly increases the temporal resolution and the processing capability of the MMCR. The Barrow MMCR upgrade will be completed in early 2004. We will discuss the hardware and software C40 upgrade to the MMCRs at SGP and Barrow and the plans

27

September 2012, Training Work Group Status Overview  

Broader source: Energy.gov (indexed) [DOE]

Training Work Group Status Overview Training Work Group Status Overview Accomplishments: 1. May 7-8. Attended NIEHS Trainer's Exchange in Oak Ridge. 2. May 8-9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker pilot. Entities visited included ORISE, Y-12, DOE TRU Project, and local labor entities. 3. June 19-20. Participated with Char Wells, Sandia National Laboratory Training Manager, (NTC, NIEHS and HAMMER in attendance) at a DOE M&O contractor led Learning/Training Workshop. - Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business Management Working Group. - Serving this group as data repository and communications hub for efforts to standardize General Employee Radiation Training (GERT) within DOE. - Briefed the complex wide Radworker reciprocity concept finding interest and

28

Transportation Plan Ad Hoc Working Group | Department of Energy  

Office of Environmental Management (EM)

Transportation Plan Ad Hoc Working Group Transportation Plan Ad Hoc Working Group Transportation Plan Ad Hoc Working Group More Documents & Publications Nuclear Fuel Storage and...

29

UNIVERSITY OF WASHINGTON FALL PROTECTION WORK PLAN  

E-Print Network [OSTI]

UNIVERSITY OF WASHINGTON FALL PROTECTION WORK PLAN ENVIRONMENTAL HEALTH AND SAFETY This Work Plan Environmental Health and Safety, 206-543-0469 Call: or Seattle Fire Department 9-911 Radio Communication Center skylights, window cleaning. PROTECTION METHODS Specify protection methods for workers exposed to fall hazard

Wilcock, William

30

Status Update on Action 2b: Revision of DOE G 226.1-2 with new Guidance for Activity-level Work Planning and Control  

Broader source: Energy.gov [DOE]

Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Strengthen guidance and formality associated with contractor implementation and Federal monitoring of activity-level WP&C. Develop a DOE Guide on Federal oversight and evaluation of the effectiveness of Activity-Level WP&C.

31

Work Plan - U.S.-India Coal Working Group | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Work Plan - U.S.-India Coal Working Group Work Plan - U.S.-India Coal Working Group Work Plan - U.S.-India Coal Working Group More Documents & Publications Work Group Telecom...

32

TRANSP and PTRANSP at PPPL: Status and Plans  

E-Print Network [OSTI]

TRANSP and PTRANSP at PPPL: Status and Plans Presented at the TRANSP Users Group Meeting, APS/DPP ­ Oct. 30, 2006 Poster ­ JP1.00121 D. McCune 1 #12;TRANSP and PTRANSP at PPPL: Status and Plans JP1. Randerson, PPPL ­ The PPPL TRANSP code suite is a set of tools for time dependent simulation of tokamak

Princeton Plasma Physics Laboratory

33

MN471018, Work Planning and Control Manual  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

18, Work Planning and Control Manual 18, Work Planning and Control Manual Sponsor: Michael W. Hazen, 4000 Issue Date: January 3, 2007 Revision Date: June 1, 2009 This document is no longer a CPR. This document implements the requirements of Corporate procedure ESH100.1.WPC.1, Plan and Control Work. IMPORTANT NOTICE: A printed copy of this document may not be the document currently in effect. The official version is the online version located on the Sandia Restricted Network (SRN) MN471018 - WORK PLANNING AND CONTROL MANUAL Subject Matter Expert: Brad Elkin; CA Counterpart: Aden Jackson MN471018 Revision Date: June 1, 2009; Replaces Document: October 28, 2008 Implementation Notice: The requirements outlined in this document must be incorporated into approved comprehensive organizational procedures on or before June 30, 2009. New work planned and conducted after June 30, 2009 shall be performed in accordance with this document. Ongoing work, conducted under an existing, current, and approved PHS and TWD (if required), is authorized until the expiration of the applicable PHS, TWD, or June 30, 2010.

34

Weatherization Assistance Program Quality Work Plan Requirements  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance, as well as links to the individual requirements.

35

B Plant Complex preclosure work plan  

SciTech Connect (OSTI)

This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

ADLER, J.G.

1999-02-02T23:59:59.000Z

36

US RERTR Program: overview, status and plans  

SciTech Connect (OSTI)

The status of the Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a brief review of the accomplishments which the RERTR Program, in cooperation with its many international partners, had achieved by the end of 1983 in the area of LEU research reactor fuels development and application, emphasis is placed on the RERTR Program developments which took place during 1984 and on current plans and schedules. The RERTR progress in 1984 has been significant, with solid accomplishments and few surprises. Most LEU U/sub 3/Si/sub 2/-Al irradiation tests with 4.8 g U/cm/sup 3/ have been successfully completed, and contract negotiations are under way for the procurement of a whole-core demonstration of this fuel in the ORR. The demonstration is to begin in mid-1985 and to last for approximately eighteen months. Qualification of U/sub 3/Si/sub 2/-Al fuel with 7 g U/cm/sup 3/ is scheduled for 1989. International cooperation among fuel developers, commercial vendors, and reactor operators has been essential to the progress which has been achieved. With continued international cooperation, it will be feasible to significantly reduce HEU usage in research reactors in the next few years.

Travelli, A.

1984-01-01T23:59:59.000Z

37

Burn site groundwater interim measures work plan.  

SciTech Connect (OSTI)

This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

2005-05-01T23:59:59.000Z

38

Siberian Chemical Combine laboratory project work plan, fiscal year 1999  

SciTech Connect (OSTI)

The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites` input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves.

Morgado, R.E.; Acobyan, R.; Shropsire, R.

1998-12-31T23:59:59.000Z

39

Annual work plan for FY 1990  

SciTech Connect (OSTI)

The Office of Inspector General (OIG) has an overall mission to prevent and detect fraud, waste, and mismanagement in Department of Energy (DOE) programs. As part of its responsibility in accomplishing its mission, the DOE Office of Audits publishes an Annual Work Plan'' in September of each year. The prime focus of the plan is to identify opportunities for audits to enhance the effectiveness, efficiency, and integrity of the DOE's programs and operations. Through this plan, we are able to maximize the effectiveness of our resources and to avoid duplicating audit coverage being provided by other audit groups, such as the US General Accounting Office (GAO) to US Department of Energy programs. Such planning is required by Office of Management and Budget Circular A-73 and DOE Order 2321.1. This work plan, in an effort to more realistically plan the year ahead, moves away from the traditional listing of all audits to be undertaken for the year. Only those audits that are to be carried over from the previous fiscal year and those that are to be started in the first quarter of the new fiscal year will be listed. The balance of time available has been allocated to the major program areas for FY 1990, and new audits will be identified and started during the year based on the knowledge gained from completed or in-process audits. This process represents the beginning of our use of long-term multi-year program strategies.

Not Available

1989-09-30T23:59:59.000Z

40

Contractor Work Planning and Control URS Lessons Learned | Department...  

Broader source: Energy.gov (indexed) [DOE]

Office of Environmental Management Work Planning and Control Oversight Integration of Safety Culture Attributes into EFCOG Work Planning and Control Guidance Document Lessons...

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

US - Brazil Binational Energy Working Group Joint Action Plan...  

Broader source: Energy.gov (indexed) [DOE]

US - Brazil Binational Energy Working Group Joint Action Plan US - Brazil Binational Energy Working Group Joint Action Plan brazilactionplan7202010.pdf More Documents &...

42

ClimateWorks-Egypt-Low Carbon Growth Planning Support | Open...  

Open Energy Info (EERE)

REDIRECT ClimateWorks Low Carbon Growth Planning Support Retrieved from "http:en.openei.orgwindex.php?titleClimateWorks-Egypt-LowCarbonGrowthPlanningSupport&oldid553606"...

43

Quality Work Plan Guidelines and Standards Requirement | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Work Plan Guidelines and Standards Requirement an icon of a page The Weatherization Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality...

44

Hanford Advisory Board FY2014 Work Plan - "A" List - Facilitator...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the WIPP permits o Regulatory requirements for tank waste retrieval processing. * Work plan development (see draft ORPRL work planning list) Advice PIC, RAP, TWC Public...

45

Climate VISION: Private Sector Initiatives: Magnesium: Work Plans  

Office of Scientific and Technical Information (OSTI)

Work Plans EPA's SF6 Emission Reduction Partnership for the Magnesium Industry in cooperation with the International Magnesium Association has developed a work plan for achieving...

46

Work Planning, Control and Execution | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Oversight Conclusion Work Planning, Control and Execution More Documents & Publications DOE Handbook: Implementing Activity-level Work Planning & Control at Nuclear Facilities...

47

ICDF Complex Remedial Action Work Plan  

SciTech Connect (OSTI)

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

48

Waste Isolation Pilot Plant Status and Plans - 2010  

Broader source: Energy.gov (indexed) [DOE]

WIPP Status and Plans WIPP Status and Plans - WIPP Status and Plans WIPP Status and Plans - - 2010 2010 National Transportation Stakeholders Forum National Transportation Stakeholders Forum Chicago, Illinois Chicago, Illinois May 26, 2010 May 26, 2010 Dr. Dave Moody Dr. Dave Moody Manager Manager Carlsbad Field Office Carlsbad Field Office May 26, 2010 May 26, 2010 Transportation Success * First shipment to WIPP departed Los Alamos National Laboratory on March 25, 1999 * WIPP honored with U.S. Transport Council award for transportation safety in January 2009 * More than 8,500 shipments h i d f l "...The [WIPP transportation] system is safer than that have arrived safely * Surpassed 10 million loaded miles to WIPP * Many others 2 employed for any other hazardous material in the U.S...." National Academy of Sciences,

49

Final work plan for targeted sampling at Webber, Kansas.  

SciTech Connect (OSTI)

This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

LaFreniere, L. M.; Environmental Science Division

2006-05-01T23:59:59.000Z

50

Climate VISION: Private Sector Initiatives: Aluminum: Work Plans  

Office of Scientific and Technical Information (OSTI)

Work Plans The Aluminum Association has finalized its work plan with the collaboration of EPA. The plan describes actions the industry intends to take to achieve its Climate VISION...

51

The status of energy planning in five Central American countries  

SciTech Connect (OSTI)

This report examines the current status of national energy planning in Costa Rica, El Salvador, Guatemala, Honduras, and Panama. A framework is provided that divides energy planning activities into two broad categories: the fundamental tasks'' and the bounding conditions.'' The fundamental tasks of energy planning include the gathering and systematizing of data, conducting energy situation analyses and short- or long-term planning for the country, and defining and implementing national energy plans. While the bonding conditions are situations that preclude completion of fundamental tasks, such as level of technical expertise. 20 refs., 11 figs., 2 tabs.

Booth, S.R.; Fonseca, M.G.

1991-08-01T23:59:59.000Z

52

Work Plan Guidelines and Standards Requirement | Department of...  

Energy Savers [EERE]

Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality home energy upgrades. The plan includes a Guidelines and Standards requirement...

53

Intermediate Ethanol Blends: Plans and Status  

Energy Savers [EERE]

* 60,000 E85 stations vs 1,200 today. Background * DOE intermediate ethanol blend test plan development began March 2007 - DOE funding: 14.6M (2007 & 2008) - Organizational...

54

CSMRI Flood Plain Characterization Work Plan Page 1 November 21, 2006  

E-Print Network [OSTI]

, which was not addressed in the original Site work plan. The scope of work includes vegetation removal Agency in 1997 as part of an Emergency Removal Action under CERCLA. In the vicinity of the site, the 100 if the area qualifies for wetland status and would therefore need additional controls, possibly including a U

55

Rad Monioring Subgroup Draft 1 Work Plan 020408  

Broader source: Energy.gov (indexed) [DOE]

1 of 3 1 of 3 (Draft) Work Plan for the DOE TEC Rail Topic Group Radiation Monitoring Sub-Group Status: Active TEC Stakeholder Leads: Marty Vyenielo (PA/NE Task Force), Cort Richardson (CSG-NE) DOE Lead: Alex Thrower (OCRWM) Contractor Support: John Smegal (Legin) Start Date: October 4, 2007 Purpose: The Transportation External Coordinating (TEC) Working Group's Rail Topic Group (RTG) provides stakeholder perspectives and feedback to the Office of National Transportation (ONT) in the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) and Environmental Management (EM) regarding topics of common interest concerning operating practices, logistical constraints, and other rail-related issues affecting the development and deployment of a safe, secure, and efficient system for

56

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Construction Quality Assurance Plan Construction Quality Assurance Plan This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page H-1 Construction Quality Assurance Plan 1.1 Introduction This Construction Quality Assurance Plan supports the implementation of remedial activities at LEHR covered by the Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis. This plan is consistent with and supplements the requirements of the Quality Assurance Project Plan and quality assurance elements covered in Section 7 of the Remedial Design/Remedial Action Work Plan. 1.2 Distribution This plan shall be distributed with the Remedial Design/Remedial Action Work Plan to all

57

2014 Quality Work Plan (QWP) Update | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4 Quality Work Plan (QWP) Update 2014 Quality Work Plan (QWP) Update This update was given at the 2014 ACI National Home Performance Conference & Trade Show in Detroit, Michigan by...

58

Operational efficiency through resource planning optimization and work process improvement  

E-Print Network [OSTI]

This thesis covers work done at National Grid to improve resource planning and the execution of pipeline construction and maintenance work carried out at the yards. Resource Planning, the art of picking the right jobs for ...

Balwani, Siddharth (Siddharth Vashdev)

2012-01-01T23:59:59.000Z

59

Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)  

SciTech Connect (OSTI)

This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

Not Available

1994-09-01T23:59:59.000Z

60

WIPP Status and Plans - 2013 - 13379  

SciTech Connect (OSTI)

An up-to-date look at the many aspects of America's only deep geologic long-lived radioactive waste repository is presented in this paper. WIPP's mission includes coordination of all Department of Energy (DOE) sites to prepare, package and characterize defense transuranic waste for final shipment and emplacement in WIPP. The Waste Isolation Pilot Plant (WIPP) is completing its 14. year of operations. Five of the ten planned disposal panels have been filled and sealed from ventilation, with about half of the legislated volume capacity consumed. About 11,000 shipments have been made successfully, traveling more than 40 million kilometers across the nation's highways. A fleet of new Type B shipping packages, the TRUPACT-III, has been added to the transportation capability, with an ongoing campaign to de-inventory large waste items from the Savannah River Site, while minimizing size reduction and repackaging. A new shipping and emplacement method for remote handled waste in shielded containers has been approved for disposal, and will significantly improve operational efficiency. Remote handled waste packaged in these shielded containers will be shipped, handled and emplaced as contact handled waste. Also described is a new criticality control over-pack container, which will improve efficiency when shipping high fissile-content waste streams consisting of Special Nuclear Material declared as waste from nuclear weapons sites. The paper describes the importance of the infrastructure at WIPP to ensure disposal site availability for defense transuranic waste sites across the weapons complex. With the facility reaching its original design lifetime, there are many infrastructure maintenance and improvements being planned and performed. (authors)

Nelson, R.A.; Franco, J. [U.S. Department of Energy, PO Box 3090, Carlsbad, NM 88220 (United States)] [U.S. Department of Energy, PO Box 3090, Carlsbad, NM 88220 (United States)

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

September 2012, 10 CFR 851 Work Group Status Overview  

Broader source: Energy.gov (indexed) [DOE]

10 CFR 851 Work Group Status Overview 10 CFR 851 Work Group Status Overview Accomplishments: 1. March 2012. 10 CFR 851 Workshop was held in conjunction with the 2012 Chemical Management Workshop. 2. Communication tools to enhance 10 CFR 851 Worker Safety and Health Program (WSHP) compliance updated: Requirements checklist distributed across DOE complex and on the 10 CFR 851 website; DOE Guide 440.1-1B to include technical clarifications. 3. Aug 7. A WG teleconference to reconfirm the actions described in the charter and to discuss the need to identify areas for the Work Groups next efforts. Near Term Goals/Activities: 1. Samples of acceptable WSHP programs (including ones based on ISM) will be posted on the 851 web site. 2. Teaming of HS-10, NTC, NIEHS, HAMMER to: Develop and/or identify

62

An Alfirmotive Action/Equal Opportunity Employer STATUS AND PLANS  

Office of Legacy Management (LM)

I&s ' c I&s ' c c scilenti ? alamos c laboratoiy of ihe University of California Lsr i'"""', i'" MEXICO 8,545 An Alfirmotive Action/Equal Opportunity Employer STATUS AND PLANS REPORT FOR FORMER TECHNICAL AREA ONE AT LOS ALAMOS SCIENTIFIC LABORATORY HEALTH RESEARCH DIVISION JANUARY i976 I I I I I I I if n II 9 I I I I. I I I I STATUS AND PLANS REPORT FOR FORMER TECHNICAL AREA ONE AT LOS ALAMOS SCIENTIFIC LABORATORY INTRODUCTION Because of increased official and public concern over low-level radioactive contamination of private lands or former ERDA (AEC) lands released to the public, the undeveloped part of the former main tech- nical area of LASL (TA-1) was surveyed in 1974 at the request of ERDA @EC)*. This effort was to determine whether any of the land (%40

63

July 2012, 10 CFR 851 Work Group Status Overview  

Broader source: Energy.gov (indexed) [DOE]

10 CFR 851 Work Group Status Overview 10 CFR 851 Work Group Status Overview Accomplishments: 1. March 2012. 10 CFR 851 Workshop was held in conjunction with the 2012 Chemical Management Workshop. 2. Communication tools to enhance 10 CFR 851 Worker Safety and Health Program (WSHP) compliance updated: Requirements checklist distributed across DOE complex and on the 10 CFR 851 website; DOE Guide 440.1-1B to include technical clarifications. Near Term Goals/Activities: 1. Samples of acceptable WSHP programs (including ones based on ISM) will be posted on the 851 web site. 2. Teaming of HS-10, NTC, NIEHS, HAMMER to: Develop and/or identify applicable training materials and methods for the recent promulgated Hazard Communication standard, DOE wide approach for this training, and approach for

64

WPN 15-4 Quality Work Plan Requirement Update  

Energy Savers [EERE]

WEATHERIZATION PROGRAM NOTICE 15-4 EFFECTIVE DATE: October 21, 2014 SUBJECT: Quality Work Plan Requirement Update PURPOSE: This guidance provides updates to WPN 14-4 issued...

65

Hanford Advisory Board Fiscal Year 2015 Interim Work Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Advisor Nina Menard, Ecology Action: Public Involvement Presentation by DOE-RL RAP Hanford Advisory Board Fiscal Year 2015 Interim Work Plan Adopted by consensus September 5,...

66

Site Visit Report - Independent Oversight Review of Work Planning...  

Broader source: Energy.gov (indexed) [DOE]

representatives participate in daily work planning meetings; and instituting Conduct of Operations training for front line managers and Facility Managers. PRS also began...

67

Integration of Safety Culture Attributes into EFCOG Work Planning...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Work Planning and Control Guidance Document May 15, 2013 Presenters: Steele Coddington, NSTec, Las Vegas, and John McDonald, WRPS, Hanford Topics Covered: Integration of Safety...

68

Project Management Plan (PMP) for Work Management Implementation  

SciTech Connect (OSTI)

The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

SHIPLER, C.E.

2000-01-13T23:59:59.000Z

69

FY 1999 annual work plan for infrastructure program WBS 6  

SciTech Connect (OSTI)

The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

Donley, C.D.

1998-08-27T23:59:59.000Z

70

Climate VISION: PrivateSector Initiatives: Mining: Work Plans  

Office of Scientific and Technical Information (OSTI)

Work Plans Work Plans The National Mining Association (NMA) will lead the industry effort to produce a work plan in collaboration with DOE and EPA. The plan will include the industry's proposed implementation actions to reduce greenhouse gas emission intensity by 2012 and a schedule for achieving its commitments. The industry group, with the assistance of DOE and EPA, will implement the actions. It is anticipated that the work plan may contain four major components: Element 1: Emission measurement and reporting protocols Emission measurement and reporting protocols relate to various "Actions" of the industry group's Climate VISION letter of intent. Element 2: Identify/implement near-term, cost-effective opportunities The identification and implementation of near-term, cost-effective actions

71

Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan  

SciTech Connect (OSTI)

This document describes the planned activities and performance standards for closing the Waste Encapsulation and Storage Facility (WESF). WESF is located within the 225B Facility in the 200 East Area on the Hanford Facility. Although this document is prepared based on Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the storage unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the intention is to clean close WESF, postclosure activities are not applicable to this interim status closure plan. To clean close the storage unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or environmentally is impracticable, the interim status closure plan will be modified to address required postclosure activities. WESF stores cesium and strontium encapsulated salts. The encapsulated salts are stored in the pool cells or process cells located within 225B Facility. The dangerous waste is contained within a double containment system to preclude spills to the environment. In the unlikely event that a waste spill does occur outside the capsules, operating methods and administrative controls require that waste spills be cleaned up promptly and completely, and a notation made in the operating record. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge.

SIMMONS, F.M.

2000-12-01T23:59:59.000Z

72

Final work plan for targeted investigation at Hilton, Kansas.  

SciTech Connect (OSTI)

This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

LaFreniere, L. M.; Environmental Science Division

2007-08-28T23:59:59.000Z

73

Microsoft Word - NGNP _Work Plan Final_ - 13-Dec-06 _2_.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan December 13, 2006 December 13, 2006 Battelle Energy Alliance, LLC Contract No. 000 60209 Technical Proposal Work Plan Page - 1 AREVA NP, INC. Work Plan WORK PLAN APPROVAL...

74

Working Together to Save Lives National Weather Service Strategic Plan  

E-Print Network [OSTI]

Working Together to Save Lives National Weather Service Strategic Plan for 2005-2010 #12;i Preface for a broader range of environmental information services. NOAA's National Weather Service (NWS) Strategic Plan strategies, and a list of partners helping us with our activities. An appendix provides metrics NWS uses

75

Microsoft Word - FY09 Work Plan_External.doc  

Broader source: Energy.gov (indexed) [DOE]

sector sector NSTB National SCADA Test Bed U.S. Department of Energy Office of Electricity Delivery and Energy Reliability DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan (REVISED 07/31/2009) A plan of work for the National Laboratories that form the National SCADA Test Bed: Argonne National Laboratory Idaho National Laboratory Oak Ridge National Laboratory Pacific Northwest National Laboratory Sandia National Laboratories Fiscal Year 2 0 0 9 Work Plan NSTB FY 2009 Work Plan i FOREWORD The Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) created the National SCADA Test Bed (NSTB) program with the mission to reduce the risk of energy disruptions due to cyber attack on control systems. So far the program's projects have

76

Memorandum, NNSA Activity Level Work Planning & Control Processes...  

Broader source: Energy.gov (indexed) [DOE]

Level Work Planning & Control Processes, January 2006 More Documents & Publications DOE-HDBK-1211-2014 Order Module--DOE G 450.4-1B, INTEGRATED SAFETY MANAGEMENT SYSTEM GUIDE CRAD,...

77

Proper Sustainability: GAP Grant Proposal Work Plan Strategy Webinar  

Office of Energy Efficiency and Renewable Energy (EERE)

In this webinar I will discuss the new GAP grant requirements for tribal environmental programs and strategies for crafting a work plan that focuses on capacity building activities. My goal is to...

78

3.0 Work Planning and Authorization 0913  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Work Work Planning and Authorization Integrated Safety Management tells us to plan work, analyze the hazards, ensure controls are in place, and obtain authorization before starting work. There are systems in place to help you do these things. Work Planning Before starting a new project, the first step is to think about what will be needed to get the job done: * Project scope and schedule Define what you are trying to accomplish and when it needs to be done. * People How many people and what types of skills will be needed? Do you already have the right people in your work group? Human Resources and AFRD management can help you find the right people. There may be people in other AFRD programs who can help. AFRD often partners with other Divisions (Advanced Light Source, Engineering, Materials Sciences, Environmental Energy

79

Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.  

SciTech Connect (OSTI)

This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

LaFreniere, L. M.; Environmental Science Division

2007-02-02T23:59:59.000Z

80

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMEDs guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A Phase I RFI was completed at WIPP as part of a Voluntary Release Assessment (VRA). The risk-based decision criteria recommended by EPA for the VRA were contained in a proposed Corrective Action rule for SWMUs (EPA, 1990). EPA Region VI has issued new risk-based screening criteria applicable to the WIPP SWMUs and AOCs.

Washington TRU Solutions LLC

2000-02-25T23:59:59.000Z

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Microsoft PowerPoint - PA CoP Status and plans.pptx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Practice Status and Plans Performance Assessment Community of Practice Technical Exchange May 25, 2011 Martin J Letourneau DOE Office of Environmental Compliance 5/25/2011 Print Close 2 History and Background * Originally envisioned and established in 2008 under DOE HLW Corporate Board * Very DOE and EM oriented * Sponsored 2 technical exchange meetings (Salt Lake and Richland) * Went dormant when HLW Corporate Board was on hiatus * Corporate Board Shifted to Office of Environmental Compliance * Identified opportunity to make PA CoP broader and free- standing 5/25/2011 Print Close 3 Initial Steering Committee Meeting * Met Monday to develop path forward and work on charter - Alaa aly, Intera

82

PRE-DESIGN INVESTIGATION WORK PLAN FOR COLDWATER CREEK FROM  

E-Print Network [OSTI]

Formerly Utilized Sites Remedial Action Program #12;#12;REVISION 0 PRE-DESIGN INVESTIGATION WORK PLANREVISION 0 PRE-DESIGN INVESTIGATION WORK PLAN FOR COLDWATER CREEK FROM FROST AVENUE TO ST. DENIS.S. Army Corps of Engineers, St. Louis District Office, Formerly Utilized Sites Remedial Action Program

US Army Corps of Engineers

83

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Remedial Design/Remedial Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 LMS/LEH/S05822-0.0 This page intentionally left blank LMS/LEH/S05822-0.0 Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page i Contents Abbreviations ................................................................................................................................. iii 1.0 Introduction ........................................................................................................................1-1

84

Audience/Panel Discussion: Sites Lesson Learned about Activity-level Work Planning and Control Using EFCOG Work Planning and Control Guideline  

Broader source: Energy.gov [DOE]

Slide Presentation by Donna J. Governor, Deputy Dept Mgr for Planning & Integration, Lawrence Livermore National Laboratory. Lawrence Livermore National Laboratory work planning and control lessons learned and audience/panel discussion on site's lessons learned about Activity-level Work Planning and Control using EFCOG Work Planning and Control Guideline Document.

85

Status Update on Action 2a: Implementation Handbook for Activity...  

Broader source: Energy.gov (indexed) [DOE]

a: Implementation Handbook for Activity-level Work Planning and Control Status Update on Action 2a: Implementation Handbook for Activity-level Work Planning and Control Addthis...

86

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

Washington TRU Solutions LLC

2001-02-25T23:59:59.000Z

87

Climate VISION: Private Sector Initiatives: Business Roundtable: Work Plans  

Office of Scientific and Technical Information (OSTI)

Work Plans Work Plans Business Roundtable Logo Business Roundtable is an association of 160 leading CEOs of companies with 4.5 trillion dollars in annual revenue and employing nearly 10 million people. While we are leading the way on many fronts, our commitment to a sustainable future is our top priority. Our work on Climate RESOLVE (Responsible Environmental Steps, Opportunities to Lead by Voluntary Efforts), mobilizes the resources and expertise of the Roundtable member companies behind the goal of enhanced action to control greenhouse gas (GHG) emissions and improve the GHG intensity of the U.S. economy. We are pleased that the vast majority of our members are participating in Climate RESOLVE. A complete list of our Climate RESOLVE members is available on our website.

88

Tank waste remediation system multi-year work plan  

SciTech Connect (OSTI)

The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

Not Available

1994-09-01T23:59:59.000Z

89

E-Print Network 3.0 - action work plan Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

work plan Search Powered by Explorit Topic List Advanced Search Sample search results for: action work plan Page: << < 1 2 3 4 5 > >> 1 The two faces of plan repair Roman van der...

90

Lesson Learned by Savannah River Site Activity-level Work Planning and Control  

Broader source: Energy.gov [DOE]

Slide Presentation by Bonnie Barnes, Savannah River Remediation. Work Planning and Control at Savannah River Remediation.

91

Fusion Energy for Power Production: Status Assessment, Identification of Challenges and Strategic Plan for Commercialization  

E-Print Network [OSTI]

1 Fusion Energy for Power Production: Status Assessment, Identification of Challenges and Strategic in the Technical Assessment Committee (TAC) and 4) EPRI being the Program Manager for the project. Establish Plan for Commercialization March 2011 Phase I. Status Assessment and Identification of Challenges

92

FY 95 engineering work plan for the design reconstitution implementation action plan  

SciTech Connect (OSTI)

Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities, a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.

Bigbee, J.D.

1994-11-09T23:59:59.000Z

93

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-02-14T23:59:59.000Z

94

Remedial action work plan for the Colonie site. Revision 1  

SciTech Connect (OSTI)

The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab.

Not Available

1985-08-01T23:59:59.000Z

95

WPN 14-4: Quality Work Plan Requirement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

WPN 14-4: Quality Work Plan Requirement WPN 14-4: Quality Work Plan Requirement This guidance describes requirements to support and verify quality work in the Department of...

96

Plutonium-Uranium Extraction (PUREX) facility preclosure work plan  

SciTech Connect (OSTI)

The dangerous waste permit identification number (WA7890008967)was issued by the U.S. Environmental Protection Agency and the Washington State Department of Ecology. This identification number encompasses a number of treatment, storage, and/or disposal units within the Hanford Facility. One of these treatment, storage, and/or disposal units is the PUREX Facility,currently undergoing a phased closure. The PUREX Facility Preclosure Work Plan submittal differs from closure plans previously submitted by the U.S. Department of Energy, Richland Operations Office to the Washington State Department of Ecology,in that the closure process occurs in three distinct phases as part of the decommissioning process (i.e., transition,surveillance and maintenance, and disposition). Final closure will occur during the disposition phase. This phased decommissioning process is implemented because development of a complete closure plan during the transition phase is impractical and future land use determinations have not been identified. The objective of the transition phase is to place the PUREX Facility in a safe configuration with respect to human health and the environment. Following the transition phase activities, the PUREX Facility will begin the surveillance and maintenance phase of 10 or more years until disposition phase activities commence. The closure plan for the PUREX facility will be prepared during the disposition phase. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels. The PUREX Storage Tunnels are an operating storage unit(DOE/RL-94-24).

Bhatia, R.K., Westinghouse Hanford

1996-07-09T23:59:59.000Z

97

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Sample Collection Procedures Sample Collection Procedures This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page E-1 1.0 Sampling Methods Monitoring well samples will be collected according to Standard Operating Procedure 9.1, "Low-Flow Ground Water Sampling with Dedicated Pumps". A sample preparation area will be established adjacent to the well location. The work surface will be covered with plastic sheeting to minimize the potential spread of contamination. The following equipment will be staged in the sample-preparation area: * A spill kit, * Personal protective equipment, * Sample containers, * A decontamination station, * Bailers, * A wastewater drum, * Custody seals, and

98

Core-debris accommodation research: status and plans. [LMFBR  

SciTech Connect (OSTI)

The results of a recent task force study to review the US DOE core-debris accommodation program are presented. The status of technology for in-vessel retention, debris carryover, and ex-vessel retention is summarized. The potential safety issues and the research and development needs are reviewed and a series of tasks and facility requirements are defined. The status of particulate debris-bed coolability experiments are reviewed in detail. Possible mechanisms which might prevent channel formation in debris beds are identified, and the results of the investigation are presented. The effect of stratification and the method of stratification on debris coolability are demonstrated.

Baker, L. Jr.; Pedersen, D.R.; Sowa, E.S.; Gabor, J.D.; Alter, H.

1982-01-01T23:59:59.000Z

99

FY 1992 work plan and technical progress reports  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

NONE

1992-11-01T23:59:59.000Z

100

DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan | Department...  

Broader source: Energy.gov (indexed) [DOE]

OE National SCADA Test Bed Fiscal Year 2009 Work Plan DOEOE National SCADA Test Bed Fiscal Year 2009 Work Plan This document is designed to help guide and strengthen the DOEOE...

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

E-Print Network 3.0 - action plan work Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

work Search Powered by Explorit Topic List Advanced Search Sample search results for: action plan work Page: << < 1 2 3 4 5 > >> 1 The two faces of plan repair Roman van der Krogt...

102

Microsoft Word - Security TG Work Plan 8-7-06.doc  

Broader source: Energy.gov (indexed) [DOE]

7/2006 7/2006 Page 1 of 5 WORK PLAN FOR THE DOE TEC SECURITY TOPIC GROUP (STG) Status: Active DOE Leads: Office of Civilian Radioactive Waste Management (OCRWM), Office of Logistics Management (OLM), Alex Thrower Start Date: September 21, 2004 Purpose: The purpose of the Security Topic Group (STG) is to assist the Office of Civilian Radioactive Waste Management (OCRWM) in developing an approach for effective safeguards and security of nuclear waste shipments to Yucca Mountain, Nevada. This approach will incorporate best practices and lessons learned from previous domestic and international nuclear waste shipments, with special emphasis on substantive contributions from the State, Tribal, and local governments that will be involved in these shipments.

103

Waste Isolation Pilot Plant Status and Plans - 2012 - 12049  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP), a deep geologic repository for safe disposal of long-lived transuranic radioactive waste related to the nation's defense, is completing its 12. year of operations. WIPP's mission includes coordination of all Department of Energy (DOE) sites to prepare, package and characterize transuranic (TRU) waste for final shipment and emplacement in WIPP. Five of the 10 disposal panels planned have been filled and sealed from ventilation. Additional small quantity sites have been de-inventoried by consolidating their waste through the certified characterization line at the Idaho National Laboratory (INL). New emplacement methods for RH waste in shielded containers are being considered for disposal by WIPP's regulatory authorities. A new large Type B shipping package, was added to the WIPP transportation fleet, and facility modifications to the WIPP waste unloading and emplacement processes for large containers were completed in 2011. Shipments from the Savannah River site in these new large rectangular packages began in August 2011. Licensing efforts are proceeding for a new criticality control over-pack container that will allow almost twice the fissile content to be shipped than previously. This will reduce the number and cost of shipments of Special Nuclear Material (SNM) declared as waste. Modifications to WIPP regulatory requirements for the disposal footprint and disposal unit closure systems are in progress. These, and other developments, make for exciting times at WIPP. This paper provides an up-to-date look at the many aspects of America's only deep geologic long-lived radioactive waste repository, which is completing its 12. year of operations. A record year of safe and compliant shipments to WIPP tops the list of accomplishments in 2011. Four more small quantity sites were de-inventoried by consolidating their waste through the certified characterization line at INL in 2011. A new Type B shipping package, the TRUPACT-III has been added to the transportation fleet, and large waste boxes are being shipped from SRS without the need for repackaging. New emplacement methods for remote-handled waste in shielded containers are undergoing regulatory review. WIPP plans to license a new criticality control payload container that will allow almost twice the fissile content to be shipped than previously, thereby reducing the number and cost of shipments of SNM declared as waste. Other regulatory modifications planned in 2012 include approval of a design change that would replace the disposal concept for panels 9 and 10 from using the common access drifts (the 'mains') with a new footprint south of panels 4 and 5. DOE also plans to change the panel closure design set forth in its certification by EPA and the HWFP by the NMED. The panel closure design change will be a rule making under EPA's procedures and a class 3 permit modification request under NMED procedures. Plans for achieving 90% of legacy TRU waste retrieval and emplacement in WIPP by 2015 have been developed. Key to the success of this so-called 90/15 plan is adequate funding, both for WIPP operations, as well as for TRU retrieval programs at the generator sites. (authors)

Nelson, Roger A.; Ziemianski, Edward J. [U.S. Department of Energy, Carlsbad, NM 88220 (United States)

2012-07-01T23:59:59.000Z

104

Remedial Action Work Plan Amchitka Island Mud Pit Closures  

SciTech Connect (OSTI)

This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

DOE/NV

2001-04-05T23:59:59.000Z

105

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Travel Time Estimates for Constituents of Concern Travel Time Estimates for Constituents of Concern This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page C-1 Table C-1. Estimated Contaminant Migration Travel Time from DOE Areas to Monitoring Wells DOE Area Monitoring Well Distance from DOE Area Boundary to Monitoring Well (feet) Constituent Kd a (ml/g) Retardation factor b (unitless) Estimated Travel Time Range c (years) Domestic Septic System- 1 UCD1-071 15 Aluminum 9.9 55 28 276 Domestic Septic System- 3 UCD1-069 15 Formaldehyde 0.0018 1.0 0.50 5.0 15 Molybdenum 20 111 55 553 15 Nitrate 0 1.0 0.50 5.0 15 Aluminum 9.9 55 28 276 15 Silver 8.3 47 23 233 Domestic Septic System- 4 UCD1-068 60 Selenium 300 1,646 3,293 32,929

106

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Reporting Limits Reporting Limits This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page F-1 Table F-1. Reporting Limits for Monitoring Parameters, DOE LEHR Parameter Method Reference Laboratory Reporting Limit MDL Units Aluminum EPA 6020A CalScience Environmental Lab 10.5 50 µg/L Antimony EPA 6020A CalScience Environmental Lab 1 0.38 µg/L Arsenic EPA 6020A CalScience Environmental Lab 1 0.589 µg/L Barium EPA 6020A CalScience Environmental Lab 1 0.105 µg/L Beryllium EPA 6020A CalScience Environmental Lab 1 0.131 µg/L Cadmium EPA 6020A CalScience Environmental Lab 1 0.266 µg/L Chromium, total EPA 6020A CalScience Environmental Lab 1 0.618 µg/L Cobalt EPA 6020A CalScience Environmental Lab 1 0.14 µg/L

107

Current Status and Future Works of Neutron Scattering Laboratory at BATAN in Serpong  

SciTech Connect (OSTI)

Current status of neutron beam instruments using neutrons produced by the Multi Purpose Research Reactor--30MWth (MPR 30, RSG GA Siwabessy) located in Serpong is presented. Description of the reactor as the neutron source is mentioned briefly. There are six neutron beam tubes coming from the beryllium reflector surrounding half of the reactor core providing neutrons in the experimental hall of the reactor (XHR). Four of them are dedicated to R and D in materials science using neutron scattering techniques. Neutron Radiography Facility (NRF), Triple Axis Spectrometer (TAS) and Residual Stress Measurement (RSM) Diffractometer are installed respectively at beam tubes S2, S4 and S6. The largest neutron beam tube (S5) is exploited to accommodate two neutron guide tubes that transfer the neutrons to a neighbouring building called neutron guide hall (NGH). There are three other neutron beam instruments installed in this building, namely Small Angle Neutron Scattering (SANS) Spectrometer (SMARTer), High Resolution SANS (HRSANS) Spectrometer and High Resolution Powder Diffractometer (HRPD). In the XHR, a Four Circle and Texture Diffractometer (FCD/TD) is attached to one of the neutron guide tubes. These seven instruments were installed to utilize the neutrons for materials science research, and recently the RSM diffractometer has shown its capabilities in identifying different amount of stress left due to different treatments of welding in fuel cladding, while the SANS spectrometer is now gaining capabilities in identifying different sizes and shapes of macromolecules in polymers as well as investigations of magnetic samples. In the mean time, non-destructive tests using the NRF is gathering more confidence from some latest real time measurements eventhough there are still some shortcomings in the components and their alignments. Future works including improvement of each facility and its components, even replacement of some parts are necessary and have to be carried out carefully. A plan for developing a neutron reflectometer at one of the neutron guide in the Neutron Guide Hall is also part of the near future activities.

Ikram, A. [Center of Technology for Nuclear Industrial Materials, National Nuclear Energy Agency of Indonesia (BATAN) Kawasan Puspiptek Serpong, Tangerang 15314 (Indonesia)

2008-03-17T23:59:59.000Z

108

Egypt-ClimateWorks Low Carbon Growth Planning Support | Open...  

Open Energy Info (EERE)

Egypt Northern Africa References LCGP support1 Low Carbon Growth Plans Advancing Good Practice, August 20092 Overview "Achieving development goals depends on enabling poorer...

109

The Greenland Telescope (GLT): Antenna status and future plans  

E-Print Network [OSTI]

The ALMA North America Prototype Antenna was awarded to the Smithsonian Astrophysical Observatory (SAO) in 2011. SAO and the Academia Sinica Institute of Astronomy & Astrophysics (ASIAA), SAO's main partner for this project, are working jointly to relocate the antenna to Greenland to carry out millimeter and submillimeter VLBI observations. This paper presents the work carried out on upgrading the antenna to enable operation in the Arctic climate by the GLT Team to make this challenging project possible, with an emphasis on the unexpected telescope components that had to be either redesigned or changed. Five-years of inactivity, with the antenna laying idle in the desert of New Mexico, coupled with the extreme weather conditions of the selected site in Greenland have it necessary to significantly refurbish the antenna. We found that many components did need to be replaced, such as the antenna support cone, the azimuth bearing, the carbon fiber quadrupod, the hexapod, the HVAC, the tiltmeters, the antenna ...

Raffin, Philippe; Asada, Keichi; Blundell, Raymond; Burgos, Roberto; Chang, Chih-Cheng; Chen, Ming-Tang; Christensen, Robert; Grimes, Paul K; Han, C C; Ho, Paul T P; Huang, Yau-De; Inoue, Makoto; Koch, Patrick M; Kubo, Derek; Leiker, Steve; Liu, Ching-Tang; Martin-Cocher, Pierre; Matsushita, Satoki; Nakamura, Masanori; Nishioka, Hiroaki; Nystrom, George; Paine, Scott N; Patel, Nimesh A; Pradel, Nicolas; Pu, Hung-Yi; Shen, H -Y; Snow, William; Sridharan, T K; Srinivasan, Ranjani; Tong, Edward; Wang, Jackie

2014-01-01T23:59:59.000Z

110

Fission neutron spectra measurements at LANSCE - status and plans  

SciTech Connect (OSTI)

A program to measure fission neutron spectra from neutron-induced fission of actinides is underway at the Los Alamos Neutron Science Center (LANSCE) in a collaboration among the CEA laboratory at Bruyeres-le-Chatel, Lawrence Livermore National Laboratory and Los Alamos National Laboratory. The spallation source of fast neutrons at LANSCE is used to provide incident neutron energies from less than 1 MeV to 100 MeV or higher. The fission events take place in a gas-ionization fission chamber, and the time of flight from the neutron source to that chamber gives the energy of the incident neutron. Outgoing neutrons are detected by an array of organic liquid scintillator neutron detectors, and their energies are deduced from the time of flight from the fission chamber to the neutron detector. Measurements have been made of the fission neutrons from fission of {sup 235}U, {sup 238}U, {sup 237}Np and {sup 239}Pu. The range of outgoing energies measured so far is from 1 MeV to approximately 8 MeV. These partial spectra and average fission neutron energies are compared with evaluated data and with models of fission neutron emission. Results to date will be presented and a discussion of uncertainties will be given in this presentation. Future plans are to make significant improvements in the fission chambers, neutron detectors, signal processing, data acquisition and the experimental environment to provide high fidelity data including mea urements of fission neutrons below 1 MeV and improvements in the data above 8 MeV.

Haight, Robert C [Los Alamos National Laboratory; Noda, Shusaku [Los Alamos National Laboratory; Nelson, Ronald O [Los Alamos National Laboratory; O' Donnell, John M [Los Alamos National Laboratory; Devlin, Matt [Los Alamos National Laboratory; Chatillon, Audrey [CEA-FRANCE; Granier, Thierry [CEA-FRANCE; Taieb, Julien [CEA-FRANCE; Laurent, Benoit [CEA-FRANCE; Belier, Gilbert [CEA-FRANCE; Becker, John A [LLNL; Wu, Ching - Yen [LLNL

2009-01-01T23:59:59.000Z

111

Hanford Advisory Board FY2014 Work Plan - "A" List - RAP ISSUE...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(see draft ORPRL work planning list) Advice PIC, RAP, TWC RAP IMs: Mattson Peltier Heacock Larsen* Pollet Public Understanding of...topic Involving an informed public...

112

Lesson Learned by Lawrence Livermore National Laboratory Activity-level Work Planning and Control  

Broader source: Energy.gov [DOE]

Slide Presentation by Donna J. Governor, Lawrence Livermore National Laboratory. Lessons Learned by Lawrence Livermore National Laboratory Activity-Level Work Planning & Control.

113

Review of the Waste Isolation Pilot Plant Work Planning and Control...  

Office of Environmental Management (EM)

Independent Oversight Review of the Waste Isolation Pilot Plant Work Planning and Control Activities April 2013 Office of Safety and Emergency Management Evaluations Office of...

114

Site Characterization Work Plan for Gasbuggy, New Mexico  

SciTech Connect (OSTI)

Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities will focus on the surface/shallow subsurface sampling and modeling. Suspected potential contaminants of concern for investigative analysis at the Gasbuggy Site include total petroleum hydrocarbons (diesel- and gasoline-range), volatile organic compounds, semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and radionuclides. The results of this characterization and risk assessment will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-site disposal of contaminated waste which will be presented in a subsequent corrective action decision document.

DOE/NV

2000-12-14T23:59:59.000Z

115

Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution, January 2013  

Broader source: Energy.gov (indexed) [DOE]

Review of the Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1

116

September 2012, HSS Focus Group Strategic Initiatives Work Group - Status Overviews  

Broader source: Energy.gov (indexed) [DOE]

Strategic Initiatives Work Group Status Overview Strategic Initiatives Work Group Status Overview Accomplishments: 1. June 26. Telecom with USW - Informative near-miss occurrence reporting. 2. June 29. HS-24 finalized and released the Injury and Illness Dashboard. 3. July 30. Meeting held to reconfirm the priorities of and a path forward for the HSS Union Strategic Initiatives WG. - Discussed worker safety and reporting issues and confirmed that reporting and recording would be the near-term focus of the group. - The recent release of the Injury and Illness Dashboard as a tool for easily exploring DOE occupational safety and health injury and illness information was also highlighted. 4. Aug 29 - 31. HSS Analysis Lead (Steve Domotor) attended USW's DOE Worker

117

40 CFR 265 interim-status ground-water monitoring plan for the 2101-M pond  

SciTech Connect (OSTI)

This report outlines a ground-water monitoring plan for the 2101-M pond, located in the southwestern part of the 200-East Area on the Hanford Site in south-central Washington State. It has been determined that hazardous materials may have been discharged to the pond. Installation of an interim-status ground-water monitoring system is required under the Resource Conservation and Recovery Act to determine if hazardous chemicals are moving out of the pond. This plan describes the location of new wells for the monitoring system, how the wells are to be completed, the data to be collected, and how those data can be used to determine the source and extent of any ground-water contamination from the 2101-M pond. Four new wells are planned, one upgradient and three downgradient. 35 refs., 12 figs., 9 tabs.

Chamness, M.A.; Luttrell, S.P.; Dudziak, S.

1989-03-01T23:59:59.000Z

118

Employment Information for Master of Urban Planning Graduates Working  

E-Print Network [OSTI]

Housing Alliance Baton Rogue, LA Michigan Community Detroit, MI Michigan Suburbs Alliance Detroit, MI of Dallas Dallas, TX City of Detroit Detroit, MI City of Milwaukee Milwaukee, WI City of Portland Portland Maryland State Highway Administration Baltimore, MD Metropolitan Area Planning Council Boston, MA Michigan

Papalambros, Panos

119

Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.  

SciTech Connect (OSTI)

The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

United States. Bonneville Power Administration. Division of Fish and Wildlife.

1988-11-01T23:59:59.000Z

120

DOE OIG Recovery Act Work Plan (FY 2011).xls  

Broader source: Energy.gov (indexed) [DOE]

OIG Recovery Act Plan Overview OIG Recovery Act Plan Overview OIG Name: Department of Energy Office of Inspector General OIG Broad Recovery Act Goals: The primary objective of the Office of Inspector General's oversight strategy involves the implementation of a review, evaluation, and investigation protocol designed to assist the Department of Energy in: (1) maximizing the performance and effectiveness of activities related to the Recovery Act; (2) preventing and detecting the fraudulent misuse of Recovery Act funds; and (3) identifying opportunities for cost savings in Recovery Act-related programs. OIG Broad Training and Outreach Recovery Act Goals: Since the passage of the Recovery Act, the Office of Inspector General has initiated an aggressive schedule to provide targeted fraud awareness briefings to

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Civil Works Planning Overview Civil Works (CW) Planning offers a structured, rational approach to solving water resources  

E-Print Network [OSTI]

and interrelated processes of social, economic, cultural, environmental and political change at every scale from values inherent in any solution and shape recommendations. · CW Planning is a creative process requiring knowledge of water resources laws and regulations, public involvement methods and processes, engineering

US Army Corps of Engineers

122

Plutonium Finishing Plan (PFP) Treatment and Storage Unit Interim Status Closure Plan  

SciTech Connect (OSTI)

This document describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) Treatment and Storage Unit. The PFP Treatment and Storage Unit is located within the 234-52 Building in the 200 West Area of the Hanford Facility. Although this document is prepared based upon Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the PFP Treatment and Storage Unit manages transuranic mixed (TRUM) waste, there are many controls placed on management of the waste. Based on the many controls placed on management of TRUM waste, releases of TRUM waste are not anticipated to occur in the PFP Treatment and Storage Unit. Because the intention is to clean close the PFP Treatment and Storage Unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. The PFP Treatment and Storage Unit will be operated to immobilize and/or repackage plutonium-bearing waste in a glovebox process. The waste to be processed is in a solid physical state (chunks and coarse powder) and will be sealed into and out of the glovebox in closed containers. The containers of immobilized waste will be stored in the glovebox and in additional permitted storage locations at PFP. The waste will be managed to minimize the potential for spills outside the glovebox, and to preclude spills from reaching soil. Containment surfaces will be maintained to ensure integrity. In the unlikely event that a waste spill does occur outside the glovebox, operating methods and administrative controls will require that waste spills be cleaned up promptly and completely, and a notation will be made in the operating record. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge.

PRIGNANO, A.L.

2000-07-01T23:59:59.000Z

123

Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development  

Broader source: Energy.gov [DOE]

Slide Presentation by Rich Davies, Kami Lowry, Mike Schlender, Pacific Northwest National Laboratory (PNNL) and Ted Pietrok, Pacific Northwest Site Office (PNSO). Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development. Work Planning and Control (WP&C) is essential to assuring the safety of workers and the public regardless of the scope of work Research and Development (R&D) activities are no exception.

124

Office of Enterprise Assessments Targeted Review of Work Planning...  

Office of Environmental Management (EM)

that includes thorough understanding of the technical basis for the work and a search for failure modes that can cause accidents to occur. Section 5.3 of Manual 471012...

125

Interim Status Groundwater Monitoring Plan for Low-Level Waste Management Areas 1 to 4, RCRA Facilities, Hanford,Washington  

SciTech Connect (OSTI)

This document describes the monitoring plan to meet the requirements for interim status groundwater monitoring at Hanford Site low-level waste burial grounds as specified by 40 CFR 265, incorporated by reference in WAC 173-303-400. The monitoring will take place at four separate low-level waste management areas in the 200-West and 200-East Areas, in the central part of the site. This plan replaces the previous monitoring plan.

Dresel, P Evan

2004-10-25T23:59:59.000Z

126

Status of U.S. Plans for an Advanced ISOL Facility, A Brief Report  

SciTech Connect (OSTI)

A brief discussion is provided of the current status of plans to build an advanced ISOL radioactive ion beam facility in the US. Designs for this new facility, which was recommended as the next major construction project of the DOE Nuclear Physics Program Office, have been proposed by two US national laboratories, Argonne National Laboratory and Oak Ridge National Laboratory. The new facility will provide orders-of-magnitude higher radioactive beam currents than existing facilities of this type and will cost in the range of $250 million.

Bertrand, F.E.

1998-11-13T23:59:59.000Z

127

Status and plans for a SRF accelerator test faciliy at Fermilab  

E-Print Network [OSTI]

A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. Expansion plans of the facility are underway that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. In addition to testing accelerator components, this facility will be used to test RF power equipment, instrumentation, LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

Leibfritz, J; Carlson, K; Chase, B; Church, M; Harms, E; Klebaner, A; Kucera, M; Lackey, S; Martinez, A; Nagaitsev, S; Nobrega, L; Piot, P; Reid, J; Wendt, M; Wesseln, S

2012-01-01T23:59:59.000Z

128

Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution, January 2013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Independent Oversight Review of the Independent Oversight Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1

129

Brazil-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Brazil-ClimateWorks Low Carbon Growth Planning Support Brazil-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Brazil-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Brazil South America References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

130

Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning  

Open Energy Info (EERE)

Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Democratic Republic of Congo-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Democratic Republic of Congo Middle Africa References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development

131

Malaysia-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Malaysia-ClimateWorks Low Carbon Growth Planning Support Malaysia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Malaysia-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Malaysia South-Eastern Asia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

132

Guyana-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Guyana-ClimateWorks Low Carbon Growth Planning Support Guyana-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Guyana-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Guyana South America References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

133

Indonesia-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Indonesia-ClimateWorks Low Carbon Growth Planning Support Indonesia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Indonesia-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Indonesia South-Eastern Asia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

134

Papua New Guinea-ClimateWorks Low Carbon Growth Planning Support | Open  

Open Energy Info (EERE)

Papua New Guinea-ClimateWorks Low Carbon Growth Planning Support Papua New Guinea-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Papua New Guinea-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Papua New Guinea Melanesia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development

135

Kenya-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Kenya-ClimateWorks Low Carbon Growth Planning Support Kenya-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Kenya-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Kenya Eastern Africa References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

136

China-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

China-ClimateWorks Low Carbon Growth Planning Support China-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name China-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country China Eastern Asia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

137

2012 Bioenergy Action Plan Prepared by the Bioenergy Interagency Working Group  

E-Print Network [OSTI]

2012 Bioenergy Action Plan Prepared by the Bioenergy Interagency Working Group AUGUST 2012 Edmund G. Brown Jr., Governor #12;Bioenergy Interagency Working Group Julia Levin, Chair, Bioenergy Interagency and the California Energy Commission with input from the Bioenergy Interagency Working Group. This report

138

Work plan addendum for the remedial investigation and feasibility study of the Salmon Site  

SciTech Connect (OSTI)

This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of Energy (DOE) is conducting a focused and phased site characterization as a part, of the RI/FS. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) for evaluating hazardous waste sites on the National Priorities List (NPL). The SS is not listed on the NPL, but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA.

NONE

1995-11-01T23:59:59.000Z

139

Lessons Learned in Optimizing Workers' and Worker Representatives' Input to Work Planning and Control  

Broader source: Energy.gov [DOE]

Slide Presentation by Tom McQuiston, Dr. P.H., United Steelworkers - Tony Mazzocchi Center for Health, Safety and Environmental Education. Lessons Learned in Optimizing Workers and Worker Representatives Input in Work Planning and Control.

140

Contractor Work Planning and Control Lessons Learned from DOE and International Projects  

Broader source: Energy.gov [DOE]

Slide Presentation by Bob McQuinn; URS Global Management and Operations Services; Frank McCoy and Rick Runnels; URS - Professional Solutions. Contractor Work Planning and Control-URS Lessons Learned.

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Phase 1 Final status survey plan for the West Valley demonstration project.  

SciTech Connect (OSTI)

This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to address concerns that these pilings may have served as preferential flow pathways into the underlying Lavery till. Phase 1 FSS data collection results will be summarized, presented, and interpreted in one or more FSS reports.

Johnson, R. L. (Environmental Science Division)

2011-05-31T23:59:59.000Z

142

WPN 15-4: QUALITY WORK PLAN REQUIREMENT UPDATE  

Broader source: Energy.gov [DOE]

Effective October 21, 2014: This guidance provides updates to WPN 14-4 issued December 2, 2013. This guidance supersedes 14-4 and describes requirements to support and verify quality work in the Department of Energys (DOE) Weatherization Assistance Program (WAP). It defines what constitutes a quality installation of weatherization measures, outlines how those measures are inspected and validated, and prescribes acceptable training and credentialing of workers.

143

Single-shell tank closure work plan. Revision A  

SciTech Connect (OSTI)

In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

NONE

1995-06-01T23:59:59.000Z

144

RISMC ADVANCED SAFETY ANALYSIS WORKING PLAN FY 2015 FY 2019  

SciTech Connect (OSTI)

SUMMARY In this report, the Advanced Safety Analysis Program (ASAP) objectives and value proposition is described. ASAP focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. The set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. As part of the discussion, we have identified three sets of stakeholders, the nuclear industry, the Department of Energy (DOE), and associated oversight organizations. These three groups would benefit from ASAP in different ways. For example, within the DOE complex, the possible applications that are seen include the safety of experimental reactors, facility life extension, safety-by-design in future generation advanced reactors, and managing security for the storage of nuclear material. This report provides information in five areas: 1. A value proposition (why is this important?) that will make the case for stakeholders use of the ASAP research and development (R&D) products. 2. An identification of likely end users and pathway to adoption of enhanced tools by the end-users. 3. A proposed set of practical and achievable use case demonstrations. 4. A proposed plan to address ASAP verification and validation (V&V) needs. 5. A proposed schedule for the multi-year ASAP.

Ronaldo H. Szilard; Curtis L. Smith

2014-09-01T23:59:59.000Z

145

Lessons Learned at the Nevada National Security Site Implementing the EFCOG Activity-level Work Planning and Control Guide  

Broader source: Energy.gov [DOE]

Slide Presentation by Steele Coddington, Work Planning Manager, National Security Technologies, Nevada National Security Site. Lessons Learned Implementing Work Planning & Control. 6 Step Process for improving WP&C.

146

Status and Prospects of the Global Automotive Fuel Cell Industry and Plans for Deployment of Fuel Cell Vehicles and Hydrogen Refueling Infrastructure  

Broader source: Energy.gov [DOE]

This report by Oak Ridge National Laboratory assesses the current status of automotive fuel cell technology and the plans for the deployment of refueling infrastructure.

147

R&D Plan for the High Temperature Membrane Working Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan for the Plan for the High Temperature Membrane Working Group Introduction/Background The High Temperature Membrane Working Group was established to provide a forum for greater interaction in the effort to develop high temperature membranes for PEM fuel cells. The goal of this effort is particularly challenging and requires significant fundamental research and development. The Working Group meets twice a year (immediately before or after the Electrochemical Society meeting) and includes universities, national labs, small business and industry and is open to any interested individual/organization. The first meeting was in October, 2000. Working Group members are listed in Appendix A. This plan was developed to guide the R&D activities of the Working Group. The

148

Status and Plans for an SRF Accelerator Test Facility at Fermilab  

E-Print Network [OSTI]

A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and multiple downstream beam lines for testing diagnostics and performing beam experiments. With 3 cryomodules installed this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. The facility can accommodate up to 6 cryomodules for a total beam energy of 1.5 GeV. This facility will be used to test SRF cryomodules under high intensity beam conditions, RF power equipment, instrumentation, and LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

Church, M; Nagaitsev, S

2012-01-01T23:59:59.000Z

149

Ethiopia-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Ethiopia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Ethiopia-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Ethiopia Eastern Africa References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate

150

Mexico-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Mexico-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Mexico-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Mexico Central America References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate

151

ClimateWorks Low Carbon Growth Planning Support | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Name Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Brazil, China, Democratic Republic of Congo, Egypt, Ethiopia, Guyana, India, Indonesia, Kenya, Malaysia, Mexico, Papua New Guinea South America, Eastern Asia, Middle Africa, Northern Africa, Eastern Africa, South America, Southern Asia, South-Eastern Asia, Eastern Africa, South-Eastern Asia, Central America, Melanesia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to

152

Work Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to the DOE regarding the following subjects: soil contamination from historic atmospheric nuclear testing, remediation of contaminated facilities used to support historic testing,...

153

STATUS OF SCOPING PLAN RECOMMENDED MEASURES The estimated 2020 greenhouse gas (GHG) emission reductions for measures described in the  

E-Print Network [OSTI]

1 STATUS OF SCOPING PLAN RECOMMENDED MEASURES The estimated 2020 greenhouse gas (GHG) emission. These regulations, which reflect ARB's progress towards reducing statewide GHG emissions, include comprehensive through the use of an updated GHG emission forecast. The updated forecast was developed using average

154

Long Range Plan Working Group Members | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Long Range Plan Working Group Members Long Range Plan Working Group Members Nuclear Science Advisory Committee (NSAC) NSAC Home Meetings Members Charges/Reports Charter .pdf file (629KB) NP Committees of Visitors NP Home Members Long Range Plan Working Group Members Print Text Size: A A A RSS Feeds FeedbackShare Page Baker, Keith Hampton University Lung, Allison JLAB Beene, Jim ORNL Marx, Jay LBNL Beise, Betsy University of Maryland McLerran, Larry BNL Bland, Les Indiana University Meyer, Curtis Carnegie-Mellon Bond, Peter BNL Milner, Richard MIT Bowles, Tom LANL Moss, Joel LANL Brenner, Daeg Clark University Mueller, Al Columbia Busza, Wit MIT Mueller, Berndt Duke University Cardman, Larry JLAB Natowitz, Joe Texas A&M Casten, Rick Yale University Nazarewicz, Witek Tennessee/ORNL Cates, Gordon University of Virginia Olinto, Angela

155

2007 Long Range Plan Working Group Members | U.S. DOE Office of Science  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2007 Long Range Plan Working Group Members 2007 Long Range Plan Working Group Members Nuclear Science Advisory Committee (NSAC) NSAC Home Meetings Members Charges/Reports Charter .pdf file (629KB) NP Committees of Visitors NP Home Members 2007 Long Range Plan Working Group Members Print Text Size: A A A RSS Feeds FeedbackShare Page Beise, Elizabeth University of Maryland Merninga, Lia TJNAF Bryman, Douglas TRIUMF Meyer, Curtis Carnegie Mellon University Burrows, Adam University of Arizona Meziani, Zein-Eddine Temple University Cardman, Larry TJNAF Milner, Richard MIT Casten, Richard Yale University Mueller, Berndt Duke University Cates, Gordon University of Virginia Nazarewicz, Witold University of Tennessee Cizewski, Jolie Rutgers University Nitsche, Heino University of California Dean, David ORNL Norris, Margaret LBNL Deshpande, Abhay

156

Sectored Clean-up Work Plan for Housekeeping Category Waste Sites  

SciTech Connect (OSTI)

The Sectored Clean-up Work Plan (SCWP) replaces the Housekeeping Category Corrective Action Unit Work Plan and provides a strategy to be used for conducting housekeeping activities using a sectored clean-up approach. This work plan provides a process by which one or more existing housekeeping category Corrective Action Sites (CASS) from the Federal Facility Agreement and Consent Order and/or non-FFACO designated waste site(s) are grouped into a sector for simultaneous remediation and cleanup. This increases effectiveness and efficiencies in labor, materials, equipment, cost, and time. This plan is an effort by the U.S. Department of Energy to expedite work in a more organized and efficient approach. The objectives of this plan are to: Group housekeeping FFACO CASS and non-FFACO housekeeping sites into sectors and remediate during the same field visit; Provide consistent documentation on FFACO CAS and non-FFACO clean-up activities; Perform similar activities under one approved document; Remediate areas inside the Deactivation and Decommissioning facilities and compounds in a campaign-style remediation; and Increase efficiencies and cost-effectiveness, accelerate cleanups, reduce mobilization, demobilization, and remediation costs.

S. J. Nacht

2000-02-01T23:59:59.000Z

157

Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities  

SciTech Connect (OSTI)

The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

Gregory Weatherby

2012-05-01T23:59:59.000Z

158

Draft Level 1 Remedial Investigation Work Plan: 316-3 waste disposal trenches  

SciTech Connect (OSTI)

This work plan describes the work to be performed for the initial level of site characterization for the 316.3 Trenches at the Hanford Site. This initial site characterization effort will include a review of existing environmental contamination data for the 300 Area as well as collection and analysis of environmental samples to better characterize subsurface contamination at the site. 7 refs., 10 figs., 7 tabs.

Not Available

1987-09-01T23:59:59.000Z

159

University of Glasgow Carbon Management Programme Carbon Management Plan working with  

E-Print Network [OSTI]

carbon vision 11 2.3 Strategic themes 12 Targets and objectives 13 3 Emissions Baseline and Projections. Professor Anton Muscatelli, Principal Foreword from the Carbon Trust Cutting carbon emissions as partUniversity of Glasgow Carbon Management Programme Carbon Management Plan working with Page 1 Carbon

Mottram, Nigel

160

"Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities - Environmental Impact Statements"  

Broader source: Energy.gov (indexed) [DOE]

Status of Ongoing NEPA Compliance Activities - Environmental Impact Statements" "Bonneville Power Administration Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities Environmental Impact Statements" "application/vnd.ms-excel" "#","*Title, Location","Estimated Cost","Estimated Schedule (**NEPA Milestones)",,"Description" ,"I-5 Corridor Reinforcement Project Cowlitz and Clark Counties, WA and Multnomah County, OR",5000000,"Determination Date:","application/vnd.ms-excel"," Construct about 70 miles of new 500-kV line between a new proposed substation near Castle Rock, WA and an exsting BPA substation in Troutdale, OR"

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2  

SciTech Connect (OSTI)

The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site.

Not Available

1994-09-01T23:59:59.000Z

162

The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667  

SciTech Connect (OSTI)

One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)

Young, Ralph [Paducah Citizens Advisory Board (United States)] [Paducah Citizens Advisory Board (United States)

2013-07-01T23:59:59.000Z

163

Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab  

SciTech Connect (OSTI)

The Advanced Superconducting Test Accelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750 MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

Leibfritz, J.; Andrews, R.; Baffes, C.M.; Carlson, K.; Chase, B.; Church, M.D.; Harms, E.R.; Klebaner, A.L.; Kucera, M.; Martinez, A.; Nagaitsev, S.; /Fermilab

2012-05-01T23:59:59.000Z

164

Status of the RERTR program: overview, progress and plans. [Reduced Enrighment Research and Test Reactor  

SciTech Connect (OSTI)

The status of the US Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a summary of the accomplishments which the RERTR Program had achieved by the end of 1984 with its many international partners, emphasis is placed on the progress achieved during 1985 and on current plans and schedules. A new miniplate series, concentrating on U/sub 3/Si/sub 2/-Al and U/sub 3/Si-Al fuels, was fabricated and is well into irradiation. The whole-core ORR demonstration is scheduled to begin in November 1985, with U/sub 3/Si/sub 2/-Al fuel at 4.8 g U/cm/sup 3/. Altogether, 921 full-size test and prototype elements have been ordered for fabrication with reduced enrichment and the new technologies. Qualification of U/sub 3/Si-Al fuel with approx.7 g U/cm/sup 3/ is still projected for 1989. This progress could not have been achieved without the close international cooperation which has existed since the beginning, and whose continuation and intensification will be essential to the achievement of the long-term RERTR goals.

Travelli, A.

1985-01-01T23:59:59.000Z

165

Proceedings of the North Aleutian Basin information status and research planning meeting.  

SciTech Connect (OSTI)

The North Aleutian Basin Planning Area of the Minerals Management Service (MMS) is a large geographic area with significant ecological and natural resources. The Basin includes most of the southeastern part of the Bering Sea continental shelf including all of Bristol Bay. The area supports important habitat for a wide variety of species and globally significant habitat for birds and marine mammals including federally listed species. Villages and communities of the Alaska Peninsula and other areas bordering or near the Basin rely on its natural resources (especially commercial and subsistence fishing) for much of their sustenance and livelihood. The offshore area of the North Aleutian Basin is considered to have important hydrocarbon reserves, especially natural gas. In 2006, the MMS released a draft proposed program, Outer Continental Shelf Oil and Gas Leasing Program, 2007-2012 and an accompanying draft programmatic environmental impact statement (EIS). The draft proposed program identified two lease sales proposed in the North Aleutian Basin in 2010 and 2012, subject to restrictions. The area proposed for leasing in the Basin was restricted to the Sale 92 Area in the southwestern portion. Additional EISs will be needed to evaluate the potential effects of specific lease actions, exploration activities, and development and production plans in the Basin. A full range of updated multidisciplinary scientific information will be needed to address oceanography, fate and effects of oil spills, marine ecosystems, fish, fisheries, birds, marine mammals, socioeconomics, and subsistence in the Basin. Scientific staff at Argonne National Laboratory (Argonne) were contracted to assist the MMS Alaska Outer Continental Shelf (OCS) Region in identifying and prioritizing information needs related to the North Aleutian Basin and potential future oil and gas leasing and development activities. The overall approach focused on three related but separate tasks: (1) identification and gathering of relevant literature; (2) synthesis and summary of the literature; and (3) identification and prioritization of information needs. To assist in gathering this information, MMS convened the North Aleutian Basin Information Status and Research Planning Meeting, held in Anchorage, Alaska, from November 28 through December 1, 2006; this report presents a summary of that meeting. The meeting was the primary method used to gather input from stakeholders and identify information needs and priorities for future inventory, monitoring, and research related to potential leasing and oil and gas developments in the North Aleutian Basin.

LaGory, K. E.; Krummel, J. R.; Hayse, J. W.; Hlohowskyj, I.; Stull, E. A.; Gorenflo, L.; Environmental Science Division

2007-10-26T23:59:59.000Z

166

SAFETY COMMITTEE ANNUAL PLAN TEMPLATE The safety committee and the unit administration work together in promoting the unit's safety and  

E-Print Network [OSTI]

SAFETY COMMITTEE ANNUAL PLAN TEMPLATE The safety committee and the unit administration work together in promoting the unit's safety and health efforts. The Safety Committee Annual Plan provides. Supervisors can review the plan with new employees during their safety orientation. 3. Safety committee

Collins, Gary S.

167

Executive function processes: inhibition, working memory, planning and attention in children and youth with Attention Deficit Hyperactivity Disorder  

E-Print Network [OSTI]

This study examines the roles of inhibition, attention, working memory, and planning in youth with and without ADHD. As conceptualized in theories of attention, inhibition, and working memory, difficulties with these executive processes interact...

Wolfe, Monica Eileen

2006-04-12T23:59:59.000Z

168

Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan  

SciTech Connect (OSTI)

The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

Nielsen, T. (EG and G Rocky Flats, Inc., Golden, CO (USA)); Waage, E.; Miller, D. (Stoller (S.M.) Corp., Boulder, CO (USA))

1990-01-01T23:59:59.000Z

169

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

SciTech Connect (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

170

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

SciTech Connect (OSTI)

his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

171

Review of the Waste Isolation Pilot Plant Work Planning and Control Activities, April 2013  

Broader source: Energy.gov (indexed) [DOE]

Independent Oversight Review of the Independent Oversight Review of the Waste Isolation Pilot Plant Work Planning and Control Activities April 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1 4.0 Methodology......................................................................................................................................... 2

172

Maternal work conditions, socioeconomic and educational status, and vaccination of children: A community-based household survey in Japan  

Science Journals Connector (OSTI)

AbstractObjective This study examined how maternal work-related factors, including the availability of paid maternal leave, affect childhood vaccination status. Relatively little is known about the association between the employment status of mothers and the vaccination status of their children. Method We examined data from the Japanese Study on Stratification, Health, Income, and Neighborhood (J-SHINE), an ongoing epidemiologic household panel study in Japan. We used surveys taken in 20102011 in this study. Results We found that mothers who returned to work after giving birth were much less likely to follow recommended vaccine schedules for their children compared with mothers who stayed at home and those who had left the workforce by the time of childbirth. However, taking parental leave significantly reduced the risk of not being up-to-date with the vaccination schedule at 36months of age. We also found that children whose mother was younger and less educated, and those from an economically deprived family were at a high risk of not being up-to-date with the vaccination status at 36months of age. Conclusion Because vaccination is free and widely available in Japan, our findings indicate that provision of free vaccinations is not sufficient to achieve high vaccination rates.

Michiko Ueda; Naoki Kondo; Misato Takada; Hideki Hashimoto

2014-01-01T23:59:59.000Z

173

Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas  

SciTech Connect (OSTI)

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

MCCARTHY, M.M.

1999-08-01T23:59:59.000Z

174

FY 1991 environmental research programs for the DOE Field Office, Nevada: Work plan and quarterly reports, fourth quarter report  

SciTech Connect (OSTI)

This research includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which required DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. In accordance with specific contract requirements for each activity, DRI will produce summary, status and final reports and, in some cases, journal articles which will present the results of specific research efforts. This document contains the work plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-10-01T23:59:59.000Z

175

Environmental Programs: Status of Work and Current Priorities for FY13  

SciTech Connect (OSTI)

Presentation outline is: Mission/overview, Regulatory framework, Current status of cleanup, Shift in priorities to address highest risk, Removal of above-ground waste, Continued focus on protecting water resources, and Priorities for fiscal year 2013. LANL's Environmental Mission is to: (1) Repack and ship legacy transuranic waste containers; (2) Investigate and remediate Cold War (legacy) hazardous and radioactive waste areas; (3) Demolish unused buildings; (4) Disposition solid waste from Laboratory operations; and (5) Lifecycle cost nearly $3 billion.

Jones, Patricia [Los Alamos National Laboratory

2012-08-17T23:59:59.000Z

176

RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1  

SciTech Connect (OSTI)

The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

NONE

1995-09-01T23:59:59.000Z

177

RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

Not Available

1993-06-01T23:59:59.000Z

178

"Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities: Environmental Assessments"  

Broader source: Energy.gov (indexed) [DOE]

Status of Ongoing NEPA Compliance Activities: Environmental Assessments" Status of Ongoing NEPA Compliance Activities: Environmental Assessments" "NNSA NA-21" "January 2012" "#","*Title, Location","Estimated Cost","Estimated Schedule (**NEPA Milestones)",,"Description" ,"U.S.-origin Spent Nuclear Fuel Returned to the United States from Austria in 2025",250000,"Determination Date:","February 2012","NA-21 seeks to analyze the impacts of U.S.-origin spent nuclear fuel returned to the United States from Austria in 2025 since current NEPA documentation for the U.S.-Origin Remove Program does not address this scenario." ,,,"Transmittal to State:","March 2012"

179

Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2  

SciTech Connect (OSTI)

This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ``scores`` and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process.

Dail, J.L.; Nanstad, L.D.; White, R.K.

1995-06-01T23:59:59.000Z

180

Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

NONE

1995-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Remedial Investigation Work Plan for J-Field, Aberdeen Proving Ground, Maryland  

SciTech Connect (OSTI)

The purpose of an RI/FS is to characterize the nature and extent of the risks posed by contaminants present at a site and to develop and evaluate options for remedial actions. The overall objective of the RI is to provide a comprehensive evaluation of site conditions, types and quantities of contaminants present, release mechanisms and migration pathways, target populations, and risks to human health and the environment. The information developed during the RI provides the basis for the design and implementation of remedial actions during the FS. The purpose of this RI Work Plan is to define the tasks that will direct the remedial investigation of the J-Field site at APG.

Benioff, P.; Biang, R.; Dolak, D.; Dunn, C.; Haffenden, R.; Martino, L.; Patton, T.; Wang, Y.; Yuen, C.

1995-03-01T23:59:59.000Z

182

Site observational work plan for the UMTRA Project site at Falls City, Texas  

SciTech Connect (OSTI)

Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

NONE

1995-06-01T23:59:59.000Z

183

Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska  

SciTech Connect (OSTI)

This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e disposal of contaminated waste. The results of this evaluation will be presented in a subsequent corrective action decision document.

DOE /NV

2001-03-12T23:59:59.000Z

184

Work plan for conducting an ecological risk assessment at J-Field, Aberdeen Proving Ground, Maryland  

SciTech Connect (OSTI)

The Environmental Management Division of Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation and feasibility study (RI/FS) of the J-Field area at APG pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. J-Field is within the Edgewood Area of APG in Harford County, Maryland, and activities at the Edgewood Area since World War II have included the development, manufacture, testing, and destruction of chemical agents and munitions. The J-Field site was used to destroy chemical agents and munitions by open burning and open detonation. This work plan presents the approach proposed to conduct an ecological risk assessment (ERA) as part of the RI/FS program at J-Field. This work plan identifies the locations and types of field studies proposed for each area of concern (AOC), the laboratory studies proposed to evaluate toxicity of media, and the methodology to be used in estimating doses to ecological receptors and discusses the approach that will be used to estimate and evaluate ecological risks at J-Field. Eight AOCs have been identified at J-Field, and the proposed ERA is designed to evaluate the potential for adverse impacts to ecological receptors from contaminated media at each AOC, as well as over the entire J-Field site. The proposed ERA approach consists of three major phases, incorporating field and laboratory studies as well as modeling. Phase 1 includes biotic surveys of the aquatic and terrestrial habitats, biological tissue sampling and analysis, and media toxicity testing at each AOC and appropriate reference locations. Phase 2 includes definitive toxicity testing of media from areas of known or suspected contamination or of media for which the Phase 1 results indicate toxicity or adverse ecological effects. In Phase 3, the uptake models initially developed in Phase 2 will be finalized, and contaminant dose to each receptor from all complete pathways will be estimated.

Hlohowskyj, I.; Hayse, J.; Kuperman, R. [Argonne National Lab., IL (United States). Environmental Assessment Div.] [and others

1995-03-01T23:59:59.000Z

185

March 29, 2011, Federal Technical Capabilities Panel Face-to-Face Meeting - FY 2011 Operational Plan Goals Status for Goal 2  

Broader source: Energy.gov (indexed) [DOE]

Functional Area Qualification Standards Enhancements Functional Area Qualification Standards Enhancements Deborah Monette, Champion Status: ◦ Developed Action Plan ◦ Conducted Initial Conference Call Next Steps: Next Steps: ◦ Identify viable qualification paths (4/15) Staged qualification from Entry to Expert ◦ Revise "Expert" definition in FAQS' (4/15) Knowledge and practical experience based ◦ Produce qualification path plan for FTCP Agent ◦ Produce qualification path plan for FTCP Agent comment/approval (7/30) Status: ◦ Action Plan submitted for Panel approval ◦ Brief Panel on Human Factors Engineering (3/29) Next Steps: Next Steps: ◦ Identify competencies and supporting knowledge and skills related to HFE for selected TQP functional areas (5/30) ◦ Panel approve HFE competencies (7/30)

186

Development and status of the AL Mixed Waste Treatment Plan or I love that mobile unit of mine  

SciTech Connect (OSTI)

Nine Department of Energy (DOE) sites reporting to the Albuquerque Office (AL) have mixed waste that is chemically hazardous and radioactive. The hazardous waste regulations require the chemical portion of mixed waste to be to be treated to certain standards. The total volume of low-level mixed waste at the nine sites is equivalent to 7,000 drums, with individual site volumes ranging from 1 gallon of waste at the Pinellas Plant to 4,500 drums at Los Alamos National Laboratory. Nearly all the sites have a diversity of wastes requiring a diversity of treatment processes. Treatment capacity does not exist for much of this waste, and it would be expensive for each site to build the diversity of treatment processes needed to treat its own wastes. DOE-AL assembled a team that developed the AL Mixed Waste Treatment Plan that uses the resources of the nine sites to treat the waste at the sites. Work on the plan started in October 1993, and the plan was finalized in March 1994. The plan uses commercial treatment, treatability studies, and mobile treatment units. The plan specifies treatment technologies that will be built as mobile treatment units to be moved from site to site. Mobile units include bench-top units for very small volumes and treatability studies, drum-size units that treat one drum per day, and skid-size units that handle multiple drum volumes. After the tools needed to treat the wastes were determined, the sites were assigned to provide part of the treatment capacity using their own resources and expertise. The sites are making progress on treatability studies, commercial treatment, and mobile treatment design and fabrication. To date, this is the only plan for treating waste that brings the resources of several DOE sites together to treat mixed waste. It is the only program actively planning to use mobile treatment coordinated between DOE sites.

Bounini, L. [USDOE Grand Junction Project Office, CO (United States); Williams, M. [USDOE Albuquerque Operations Office, NM (United States); Zygmunt, S. [Los Alamos National Lab., NM (United States)

1995-02-01T23:59:59.000Z

187

IRSN working program status on tools for evaluation of SFR cores static neutronics safety parameters  

SciTech Connect (OSTI)

As technical support of the French Nuclear Safety Authority, IRSN will be in charge of safety assessment of any future project of Sodium Fast Reactor (SFR) that could be built in France. One of the main safety topics will deal with reactivity control. Since the design and safety assessment of the last two SFR plants in France (Phenix and Superphenix, more than thirty years ago), methods, codes and safety objectives have evolved. That is why a working program on core neutronic simulations has been launched in order to be able to evaluate accuracy of future core characteristics computations. The first step consists in getting experienced with the ERANOS well-known deterministic code used in the past for Phenix and Superphenix. Then Monte-Carlo codes have been tested to help in the interpretation of ERANOS results and to define what place this kind of codes can have in a new SFR safety demonstration. This experience is based on open benchmark computations. Different cases are chosen to cover a wide range of configurations. The paper shows, as an example, criticality results obtained with ERANOS, SCALE and MORET, and the first conclusions based on these results. In the future, this work will be extended to other safety parameters such as sodium void and Doppler effects, kinetic parameters or flux distributions. (authors)

Ivanov, E.; Tiberi, V.; Ecrabet, F.; Chegrani, Y.; Canuti, E.; Bisogni, D.; Sargeni, A.; Bernard, F. [Institut de Radioprotection et de Surete Nucleaire IRSN, BP 17, 92262 Fontenay-aux-roses (France)

2012-07-01T23:59:59.000Z

188

Microsoft Word - Goal FTCP Action Plan Status September 6 2012.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2012 6, 2012 Goal 3 Improve FTCP Management Processes Champions: Ted Wyka, Office of Security Operations and Pat Worthington, Office of Health and Safety Objective 1: Workforce Analysis: Improving the FTCP Workforce Analysis as an Effective Tool to be Used in Other Baseline Staffing Activities Champions: Dary Newbry Accomplishments/Status * Identify available Workforce Analysis Tools. Date: March 31, 2012  Complete. o Solicitated agents for input of which three primary Workforce Analysis Tools were identified: Experience based; Facility Representative Staffing Analysis; and, SSO Staffing Analysis * Evaluate tools for application in the FTCP Workforce Analysis. Date: June 30, 2012  Complete. o Evaluation included comparison between current methodology and available

189

Report: EM Strategic Planning  

Broader source: Energy.gov (indexed) [DOE]

STRATEGIC PLANNING STRATEGIC PLANNING September 25, 2008 Submitted by the EMAB Strategic Planning Subcommittee Background In Fiscal Year (FY) 2008, the Environmental Management Advisory Board (EMAB) was tasked to assess EM's strategic planning capabilities/processes and, in particular, to review the status of the initiatives pursued by the Office of Strategic Planning and Analysis (EM-32). This charge was derived from the Board's work pertaining to the topics of Discretionary Budgeting and Technical Uncertainty and Risk Reduction, which were addressed in previous reports and recommendations to the Assistant Secretary. The EMAB Strategic Planning Committee was formed to expand on this earlier work and pursue dialogues with the EM Office of Program Planning and Budget (EM-30) in

190

Operational status and life extension plans for the Los Alamos Neutron Science Center (LANSCE)  

SciTech Connect (OSTI)

The Los Alamos Neutron Science Center (LANSCE) accelerator and beam delivery complex generates the proton beams that serve three neutron production sources, a proton radiography facility and a medical and research isotope production facility. The recent operating history of the facility, including both achievements and challenges, will be reviewed. Plans for performance improvement will be discussed, together with the underlying drivers for the ongoing LANSCE Risk Mitigation project. The details of this latter project will also be discussed.

Garnett, Robert W [Los Alamos National Laboratory; Gulley, Mark S [Los Alamos National Laboratory; Jones, Kevin W [Los Alamos National Laboratory; Erickson, John L [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

191

Operable Unit 7-13/14 in situ thermal desorption treatability study work plan  

SciTech Connect (OSTI)

This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.

Shaw, P.; Nickelson, D.; Hyde, R.

1999-05-01T23:59:59.000Z

192

CLOSURE OF THE FAST FLUX TEST FACILITY (FFTF) HISTORY & STATUS & FUTURE PLANS  

SciTech Connect (OSTI)

In 1993, the US Department of Energy (DOE) decided to shut down the Fast Flux Test Facility (FFTF) due to lack of national missions that justified the annual operating budget of approximately $88M/year. The initial vision was to ''deactive'' the facility to an industrially and radiologically safe condition to allow long-term, minimal surveillance storage until approximately 2045. This approach would minimize near term cash flow and allow the radioactive decay of activated components. The final decontamination and decommissioning (D and D) would then be performed using then-current methodology in a safe and efficient manner. the philosophy has now changed to close coupling the initial deactivation with final D and D. This paper presents the status of the facility and focuses on the future challenge of sodium removal.

FARABEE, O.A.

2006-02-24T23:59:59.000Z

193

Quality Assurance of Radiation Therapy Planning Systems: Current Status and Remaining Challenges  

SciTech Connect (OSTI)

Computerized radiation therapy planning systems (RTPSs) are pivotal for treatment planning. The acceptance, commissioning, and quality control of RTPSs are uniquely complex and are described in the American Association of Physicists in Medicine Task Group Report 53 (1998) and International Atomic Energy Agency Technical Report Series No. 430 (2004). The International Atomic Energy Agency also developed a document and data package for use by vendors and purchasers to aid with acceptance testing of RTPSs. This document is based on International Electrotechnical Commission standard 62083 (2000) and describes both 'type' tests to be performed in the factory and 'site' tests to be performed in the clinic. The American Association of Physicists Task Group Report 67 described benchmark tests for the validation of dose calculation algorithms. Test data are being produced with the backing of the U.S. National Cancer Institute. However, significant challenges remain. Technology keeps evolving rapidly, thus requiring new quality assurance (QA) procedures. Intensity-modulated radiation therapy with its use of inverse optimization has added a new dimension to QA, because the results are not intuitively obvious. New technologies such as real-time ultrasound guidance for brachytherapy, TomoTherapy, and Cyberknife, require their own specialized RTPSs with unique QA requirements. On-line imaging allows for the generation of dose reconstructions using image warping techniques to determine the daily dose delivered to the patient. With increasing computer speeds, real-time reoptimization of treatment plans will become a reality. Gating technologies will require four-dimensional dose calculations to determine the actual dose delivered to tissue voxels. With these rapidly changing technologies, it is essential that a strong QA culture is invoked in every institution implementing these procedures and that new protocols are developed as a part of the clinical implementation process.

Van Dyk, Jacob [Department of Physics and Engineering, London Regional Cancer Program/London Health Sciences Centre, London, ON (Canada); Departments of Oncology, Medical Biophysics, Diagnostic Imaging and Nuclear Medicine, and Physics and Astronomy, University of Western Ontario, London, ON (Canada)], E-mail: jake.vandyk@lhsc.on.ca

2008-05-01T23:59:59.000Z

194

Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas  

SciTech Connect (OSTI)

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

ROGERS, P.M.

2000-06-01T23:59:59.000Z

195

GLOBAL THREAT REDUCTION INITIATIVE REACTOR CONVERSION PROGRAM: STATUS AND CURRENT PLANS  

SciTech Connect (OSTI)

The U.S. Department of Energys National Nuclear Security Administration (NNSA) Reactor Conversion Program supports the minimization, and to the extent possible, elimination of the use of high enriched uranium (HEU) in civilian nuclear applications by working to convert research and test reactors and radioisotope production processes to the use of low enriched uranium (LEU). The Reactor Conversion Program is a technical pillar of the NNSA Global Threat Reduction Initiative (GTRI) which is a key organization for implementing U.S. HEU minimization policy and works to reduce and protect vulnerable nuclear and radiological material domestically and abroad.

Staples, Parrish A.; Leach, Wayne; Lacey, Jennifer M.

2009-10-07T23:59:59.000Z

196

Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)  

SciTech Connect (OSTI)

Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

2002-01-14T23:59:59.000Z

197

Site Characterization Work Plan for Gnome-Coach Site, New Mexico  

SciTech Connect (OSTI)

Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

DOE/NV

2001-02-13T23:59:59.000Z

198

Integrated Program of Experimental Diagnostics at the NNSS: An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability  

SciTech Connect (OSTI)

This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3?year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

NSTec Mission and Projects Division

2010-09-30T23:59:59.000Z

199

2012 University of Vermont Combined Research and Extension Plan of Status: Submitted  

E-Print Network [OSTI]

Extension address issues ranging from farm profitability, water and soil quality, and dairy herd disease resistance and health, to global climate change, renewable energy, youth life skills education, community and adult life-skills development. Our work is guided and evaluated by dedicated citizen advisors

Hayden, Nancy J.

200

Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues. Supplement 3  

SciTech Connect (OSTI)

As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ``A Prioritization of Generic Safety Issues,`` which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees.

Not Available

1993-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Old hydrofracture facility tanks contents removal action operations plan at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2: Checklists and work instructions  

SciTech Connect (OSTI)

This is volume two of the ORNL old hydrofracture facility tanks contents removal action operations plan. This volume contains checklists and work instructions.

NONE

1998-05-01T23:59:59.000Z

202

Work plan for the remedial investigation/feasibility study-environmental assessment for the Colonie site, Colonie, New York  

SciTech Connect (OSTI)

This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes of human exposure to site containments, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. This work also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 48 refs., 18 figs., 25 tabs.

Not Available

1990-06-01T23:59:59.000Z

203

Status of planned change requests for the waste isolation pilot plant  

SciTech Connect (OSTI)

At the submittal of the initial abstract to the Waste Management Symposium, the U.S. Department of Energy (DOE) had submitted and contemplated submitting a total of four planned change requests (PCRs) for U.S. Environmental Protection Agency (EPA) action before March of 2009. That date is the regulatory deadline for submitting the second Compliance Re-certification Application (CRA-2009) to the EPA. The Panel Closure PCR has subsequently been withdrawn in favor of postponing a final decision until after sufficient data has been obtained from the monitoring of hydrogen and methane in waste-filled rooms. A proposal to change a set of performance assessment (PA) parameters and a conceptual model has been removed from consideration due to schedule constraints. These parameters were the shear strength of the waste and the extent and evolution of the disturbed rock zone surrounding the rooms. A PCR was submitted to the EPA in April 2006 to reduce the mass of magnesium oxide (MgO) that must be emplaced in the repository. The EPA is currently reviewing the information submitted by DOE. A PCR was submitted to the EPA in November 2007 to allow emplacement of remote-handled transuranic (RH-TRU) waste in shielded containers on the floor of the repository. (authors)

Patterson, R. [Department of Energy, Carlsbad Field Office, Carlsbad, NM (United States); Gross, M. [MG Enterprises, San Rafael, CA (United States); Thompson, B. [Golder Associates, Inc., Lakewood, CO (United States); Kouba, St. [Washington Group International, Washington Regulatory and Environmental Services, Carlsbad, NM (United States)

2008-07-01T23:59:59.000Z

204

Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002)  

SciTech Connect (OSTI)

Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities will focus on the surface/shallow subsurface sampling and deep subsurface modeling. Suspected potential contaminants of concern for investigative analysis at the Gasbuggy Site include total petroleum hydrocarbons (diesel- and gasoline-range), volatile organic compounds, semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and radionuclides. The results of this characterization and risk assessment will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-site disposal of contaminated waste which will be presented in a subsequent corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

2002-01-25T23:59:59.000Z

205

R&D Plan for the High Temperature Membrane Working Group  

Broader source: Energy.gov [DOE]

Summary of challenges, approaches and technical targets for HFCIT's High Temperature Membrane Working Group.

206

work  

Broader source: Energy.gov (indexed) [DOE]

THE THE U.S. DEPARTMENT OF ENERGY'S WORKING CAPITAL FUND U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES OCTOBER 1998 AUDIT REPORT CR-B-99-01 MEMORANDUM FOR THE DIRECTOR, BUSINESS MANAGEMENT STAFF FROM: William S. Maharay Acting Manager, Capital Regional Audit Office, Office of Inspector General SUBJECT: INFORMATION : Audit Report on the Department's Working Capital Fund BACKGROUND The Department established the Working Capital Fund (Fund) in January 1996 as a financial management tool for charging the costs of common services provided at Headquarters to Departmental program offices. The objectives in establishing the Fund were to increase efficiency of the Department's operations, improve management of administrative services

207

Sandia Site Office Assessment of Activity-Levell Work Planning and Control at Sandia National Laboratories/New Mexico  

Broader source: Energy.gov (indexed) [DOE]

SNL-2011-02-18 SNL-2011-02-18 Site: Sandia National Laboratories (SNL) Subject: Office of Independent Oversight's Office of Environment, Safety and Health Evaluations Independent Activity Report for the Sandia Site Office Assessment of Activity-Level Work Planning and Control at Sandia National Laboratories /New Mexico (SNL) Dates of Activity : 02/14/2011 - 02/18/2011 Report Preparer: Patricia Williams Activity Description/Purpose: At the request of the Sandia Site Office (SSO), the Office of Environment, Safety and Health Evaluations (HS-64) personnel participated in an SSO assessment of SNL's Activity-Level Work Planning and Control processes, procedures, and implementation by line organizations, including feedback and improvement activities and efforts to sustain the

208

21st Century jobs initiative - building the foundations for a 21st Century economy. Appendix A, cluster working group initiative business plans  

SciTech Connect (OSTI)

The business and community leaders who participated in a four-month long series of working groups developed business plans for initiatives which would lead to further growth and competitiveness of each of the industrial clusters. This appendix contains those business plans as they stood at the end of the working group session mid-September, 1995.

NONE

1995-11-01T23:59:59.000Z

209

Closure of the Fast Flux Test Facility: Current Status and Future Plans  

SciTech Connect (OSTI)

The Fast Flux Test Facility (FFTF) was a 400 MWt sodium cooled fast reactor designed and constructed in the 1970's. The original purpose of the facility was to develop and test advanced fuels and materials for the liquid metal fast breeder reactor program. The facility operated very successfully from 1982 through 1992, fulfilling its original mission as well as other identified missions. However, in 1993 the Department of Energy concluded that there was no longer a need for the FFTF and thus ordered that it be shut down. Following eight years of additional study of potential new missions, the final decision to shut down the facility was made in 2001. (During this eight year period the plant was maintained in a condition to allow safe and efficient shut down or restart). The complete closure of the FFTF consists of the following phases: - Deactivation - removal/stabilization of hazards to allow long-term storage (2001-2009); - Surveillance and maintenance - minimum cost compliant storage (2010-2015); - Decontamination and decommissioning (2016-2024). All of the FFTF fuel has been removed from the site except the sodium-bonded fuel that is destined for transportation to Idaho National Laboratory for final disposition. The sodium-bonded fuel had metallic sodium inside of the fuel pin to increase the heat transfer from the fuel pellet to the clad in order to reduce pellet centerline temperature. Three hundred and seventy-six (376) fuel assemblies have been washed (sodium removed) and transferred to storage at other Hanford locations. The majority of the spent fuel is stored in interim storage casks designed for a 50 year storage life, holding seven assemblies each. All sodium systems have been drained and the sodium stored under an inert gas blanket at ambient temperature in a Sodium Storage Facility at the FFTF site. This facility consists of four large tanks and associated piping. The main contaminants are sodium-22, cesium-137 and tritium. The sodium-potassium (NaK) that was used as an intermediate cooling fluid in several FFTF systems has been drained and removed or flushed to sodium systems where it became mixed with the sodium. The in-containment hot cell has minimal sodium contamination, is currently inerted with argon and is being used for loading of the T-3 transportation cask with the sodium-bonded fuel for transportation to Idaho National Laboratory. The majority of the fuel handling machines are still operational and being used for loading the sodium-bonded fuel into the T-3 casks. This equipment will be shut down immediately following completion of shipment of the sodium-bonded fuel. The majority of hotel systems are still operating. Four of the eight 400-ton chillers have been shut down and four of the cooling towers have been shut down. The argon system is operational and supplying gas for sodium systems cover gas, in-containment hot cell atmosphere and fuel handling systems. The nitrogen system remains in service supplying cover gas to the demineralized water system and fire suppression systems. Eleven of the facilities nineteen transformers containing polychlorinated biphenyls (PCBs) have been removed and significant re-routing of power has been performed to support the long term minimum cost surveillance mode. Future plans include the complete deactivation, the long-term surveillance and maintenance, the sodium disposition and the decontamination and decommissioning The most complex and costly activity during the decontamination and decommissioning phase will be the removal of the 'residual sodium' in the sodium systems. It was impractical to remove the residual sodium during the systems draining evolution. It is estimated that approximately 24,000 liters (6,400 gallons) remain within the systems. The complexity of design of the FFTF exceeds any sodium facility in the United States in which sodium removal has occurred. There are a total of 21 miles of sodium piping in the FFTF as well as three large vessels (the reactor vessel and two spent fuel pool vessels) that will require partial disassembly and drilli

Farabee, O.A. [US Department of Energy, PO Box 550, Richland, WA 99352 (United States); Witherspoon, W.V. [Fluor Hanford, PO Box 1000 N2-51, Richland, WA 99352 (United States)

2008-01-15T23:59:59.000Z

210

Liquid effluents 1994 fiscal year work plan: WBS 1.2.2.1  

SciTech Connect (OSTI)

The program mission is to manage current and future liquid effluent streams in a safe, responsible, cost effective and legally compliant manner. This is achieved through planning and integration, public and stakeholder interaction, definition of requirements for generators and provision of timely treatment, storage, disposal capability, and waste minimization of waste streams where applicable.

Ashworth, F.L. Jr.

1993-08-01T23:59:59.000Z

211

DynCorp Tricities Services, Inc. Hanford fire department FY 1998 annual work plan  

SciTech Connect (OSTI)

The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the U.S. Department of Energy operated Hanford site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. This fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This plan provides a program overview, program baselines, and schedule baseline.

Good, D.E.

1997-08-19T23:59:59.000Z

212

OXY (Occidental Petroleum Corp. ) units plan U. K. work worth $1. 5 billion  

SciTech Connect (OSTI)

Occidental Refineries Ltd., an Occidental Petroleum Corp. subsidiary, plans to spend about $500,000 to build a 60,000 bbl/day hydrocracker on Canvey Island near London to produce aviation fuel, naphtha, and gasoline. Occidental hopes to deflect criticism by environmentalists, concerned about the concentration of petroleum facilities in the area, by installing a minimum amount of LPG storage and not using hydrogen sulfide on the site. During the 1970's, Occidental had prepared the site for the construction of a 125,000 bbl/day refinery, plans for which were scrapped after the demand for product compounds decreased. Occidental Chemical Co., another Occidental Petroleum subsidiary, plans to spend about $500,000 to build a 300,000 ton/yr ethylene plant at Peterhead, Scotl. The cracker would take part of the output from the de-ethanizer at the St. Fergus terminal for the proposed U.K. gas-gathering pipeline. Both projects would require about 3-4 yr to complete. Esso Chemical Ltd. will build a 550,000 ton/yr ethylene plant near the Mossmoran gas liquids plant in Fife, Scotl.

Not Available

1980-09-15T23:59:59.000Z

213

Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

NONE

1996-03-01T23:59:59.000Z

214

Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

Not Available

1992-09-01T23:59:59.000Z

215

New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect (OSTI)

This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Nelson, L. O.

2007-06-12T23:59:59.000Z

216

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect (OSTI)

This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

D. Vandel

2003-09-01T23:59:59.000Z

217

Waste management project fiscal year 1998 multi-year work plan WBS 1.2  

SciTech Connect (OSTI)

The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

Slaybaugh, R.R.

1997-08-29T23:59:59.000Z

218

Activity-level Work Planning and Control in the Hanford Site Worker Evaluation Tool  

Broader source: Energy.gov [DOE]

Slide Presentation by Ted Giltz, Volpentest HAMMER Federal Training Center. Hanford Site Worker Eligibility Tool, Verifying Activity-Level Worker Medical Clearance and Training. The Hanford Site Worker Eligibility Tool (HSWET) provides line management an easy to use tool to determine if workers are medically cleared and trained to perform work safely.

219

Health and Safety Work Plan for Sampling Colloids in Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This Work Plan/Site Safety and Health Plan (SSHP) and the attached work plan are for the performance of the colloid project at WAG 5. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division (ESD) and associated ORNL environmental, safety, and health support groups. The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.

Marsh, J.D.; McCarthy, J.F.

1994-01-01T23:59:59.000Z

220

Engineering Work Plan for Development of Sludge Pickup Adapter for Fuel Cleanliness Inspections  

SciTech Connect (OSTI)

The plan for developing an adapter to suction up sludge into a calibrated tube for fuel cleanliness inspection activities is described. A primary assessment of fuel cleanliness to be performed after processing through the Primary Cleaning Machine is whether the volume of any remaining canister sludge in or on a fuel assembly exceeds the allowable 14 cm{sup 3} limit. It is anticipated that a general visual inspection of the sludge inventory after fuel assembly separation will usually suffice in making this assessment, but occasions may arise where there is some question as to whether or not the observed quantity of sludge exceeds this limit. Therefore a quantitative method of collecting and measuring the sludge volume is needed for these borderline situations. It is proposed to develop an adapter that fits on the end of the secondary cleaning station vacuum wand that will suction the material from the sludge collection tray into a chamber marked with the limiting volume to permit a direct go/no-go assessment of the sludge quantity.

PITNER, A.L.

2000-01-06T23:59:59.000Z

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Hanford fire department FY 99 annual work plan WBS 6.5.7  

SciTech Connect (OSTI)

The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing a full range of services at the lowest possible cost to customers. These services include fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, the general public, or interest of the U. S. Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. The fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education.

GOOD, D.E.

1999-02-24T23:59:59.000Z

222

Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2  

SciTech Connect (OSTI)

The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

Jacobsen, P.H.

1997-09-23T23:59:59.000Z

223

Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage  

Broader source: Energy.gov (indexed) [DOE]

May 25, 2007 May 25, 2007 Kevin Kolevar Director of the Office of Electricity Deliverability and Energy Reliability Department of Energy 1000 Independence Ave., SW Washington, DC 20585 Dear Mr. Kolevar, DOE has requested that Pepco provide an update on the current work to install two new 230 kilovolt circuits into Potomac River substation and to evaluate the need for generation from the Potomac River plant to support the anticipated line outage during June, 2007. An outage on one of the 230 kV circuits is currently underway and is currently scheduled to be completed by June 2, 2007. Mirant has supported this outage with generation required to match the Potomac River area load from the substation. This has required the operation of all 5 generating units located at

224

Predictors of Working Alliance Efficacy Among State VR Counselors as a Function of Ex-offender Status.  

E-Print Network [OSTI]

??The purpose of this study was to determine if statistically significant relationships existed between burnout, stigma, flourishing, caseload size, experience, and working alliance self-efficacy and (more)

Bates, Julie

2012-01-01T23:59:59.000Z

225

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV  

SciTech Connect (OSTI)

This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

R. P. Wells

2006-11-14T23:59:59.000Z

226

Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

SAIC

2011-04-01T23:59:59.000Z

227

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III  

SciTech Connect (OSTI)

The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

R. P. Wells

2006-09-19T23:59:59.000Z

228

Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland  

SciTech Connect (OSTI)

The purpose of the feasibility study is to gather sufficient information to develop and evaluate alternative remedial actions to address contamination at J-Field in compliance with the NCP, CERCLA, and SARA. This FS Work Plan summarizes existing environmental data for each AOC and outlines the tasks to be performed to evaluate and select remedial technologies. The tasks to be performed will include (1) developing remedial action objectives and identifying response actions to meet these objectives; (2) identifying and screening remedial action technologies on the basis of effectiveness, implementability, and cost; (3) assembling technologies into comprehensive alternatives for J-Field; (4) evaluating, in detail, each alternative against the nine EPA evaluation criteria and comparing the alternatives to identify their respective strengths and weaknesses; and (5) selecting the preferred alternative for each operable unit.

Benioff, P.; Biang, C.; Haffenden, R.; Goyette, M.; Martino, L.; Patton, T.; Yuen, C.

1995-05-01T23:59:59.000Z

229

FY 1991 environmental research programs for the Nevada Operations Office: Work plan and quarterly reports, first and second quarter reports  

SciTech Connect (OSTI)

The work carried out on behalf of the DOE by the Desert Research Institute (DRI) includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to stat and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. This document contains the Work Plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-05-01T23:59:59.000Z

230

Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory  

SciTech Connect (OSTI)

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

1993-07-01T23:59:59.000Z

231

Development and Delivery of Ecologically-based IPM Packages in Central Asia Central Asia Regional IPM Program Year 3 Work plans  

E-Print Network [OSTI]

IPM Program ­ Year 3 Work plans (October 1, 2011 ­ September 30, 2012) Project Management Dr. Karim and government institutions. 3. Build institutional capacity through education, training and human resource, and Uzbekistan). This work will include cultural practices, botanicals and biopesticides, biological control

232

Fuel Cell Technologies Office: Photoelectrochemical Working Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Photoelectrochemical Working Group Photoelectrochemical Working Group Promising PEC Materials The PEC Working Group invites the international research community to assist in the development of PEC Materials White Papers to track the research status of the most promising materials classes for solar water splitting. The Photoelectrochemical Working Group meets regularly to review technical progress, develop synergies, and collaboratively develop common tools and processes for photoelectrochemical (PEC) water splitting. Its members include principal investigators and supporting personnel from U.S. Department of Energy (DOE)-funded photoelectrochemical projects. More information on planned DOE photoelectrochemical activities can be found in the Multi-Year Research, Development, and Demonstration Plan.

233

Industrial Sites Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (including Record of Technical Change Nos. 1, 2, 3, and 4)  

SciTech Connect (OSTI)

This Leachfield Corrective Action Units (CAUs) Work Plan has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the U.S. Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the U.S. Department of Defense (FFACO, 1996). Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. A work plan may be developed that can be referenced by leachfield Corrective Action Investigation Plans (CAIPs) to eliminate redundant CAU documentation. This Work Plan includes FFACO-required management, technical, quality assurance (QA), health and safety, public involvement, field sampling, and waste management documentation common to several CAUs with similar site histories and characteristics, namely the leachfield systems at the Nevada Test Site (NTS) and the Tonopah Test Range (TT R). For each CAU, a CAIP will be prepared to present detailed, site-specific information regarding contaminants of potential concern (COPCs), sampling locations, and investigation methods.

DOE/NV

1998-12-18T23:59:59.000Z

234

Project Plan, Status, and Lessons Learned for the LANL 3,706 m{sup 3} TRU Waste Campaign - 13085  

SciTech Connect (OSTI)

The Los Alamos National Laboratory (LANL) is currently engaged in a campaign to disposition 3,706 m{sup 3} of transuranic (TRU) waste stored above grade at its Technical Area 54 (TA-54) Area G waste management facility before June 30, 2014. This campaign includes complete removal of all non-cemented above-grade TRU waste that was in storage on October 1, 2011, and is defined as 3,706 m{sup 3} of material. TRU waste containers were placed into storage up to 40 years ago, and most of the older containers must be remediated to address compliance issues before the waste can be characterized, certified as meeting the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC), and shipped for disposition. More than half of the remaining TRU waste volume stored above grade is contained within oversize boxes that contain waste items that must be repackaged or size reduced. Facilities and major types of equipment needed to remediate and characterize the TRU waste inventory include two additional oversize box processing lines that are being brought into service as Nuclear Hazard Category III facilities in fiscal year (FY) 2013. Multiple work shifts are scheduled for most remediation lines in FY 2013. An integrated risk-based project management schedule for all disposition activities has been developed that is based on a 'Solution Package' approach. Inventories of containers that have issues in common were compiled into about 15 waste categories and about 75 'Solution Packages' that identify all of the activities needed to disposition the inventory of TRU waste in storage. Scheduled activities include all precursor activities to begin remediation, remediation processing, characterization and certification to the WIPP WAC, and shipping of containers to WIPP. Other industrial processing practices that have been adopted to improve efficiency include staging of containers for remediation, characterization, and shipping; establishment of a transportation center; and load management practices for transportation payloads. Progress and accomplishments during FY 2012 are reviewed, and plans for FY 2013 are presented in some detail. Lessons learned on adoption of industrial processing practices are also discussed. (authors)

Johns-Hughes, K.W.; Clemmons, J.S.; Cox, D.R.; Hargis, K.M. [Los Alamos National Laboratory, P.O. Box 1663, Los Alamos, New Mexico 87545 (United States)] [Los Alamos National Laboratory, P.O. Box 1663, Los Alamos, New Mexico 87545 (United States); Bishop, M.L. [Los Alamos Site Office, National Nuclear Security Administration, U. S. Department of Energy, 3747 W. Jemez Road, Los Alamos, New Mexico 87545 (United States)] [Los Alamos Site Office, National Nuclear Security Administration, U. S. Department of Energy, 3747 W. Jemez Road, Los Alamos, New Mexico 87545 (United States)

2013-07-01T23:59:59.000Z

235

February 28, 2006, Department letter reporting completion of NNSA portion of Commitment 23 in the 2004-1 implementation plan, Oversight of Complex, High-Hazard Nuclear Operations, which requires the development of site office action plans to improve the consistency and reliability of work planning and work control at the activity level, including the incorporation of Integrated Safety Management core functions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Washington, DC 20585 Washington, DC 20585 February 28, 2006 OFFICE O F THE ADMINISTRATOR The Honorable A. J. Eggenberger Ch a i rm an Defensc Nuclear Facilities Safety Board 625 Indiana Avenue, NW., Suite 700 Washington, D.C. 20004-2901 Dear Mr. Chairman: On Julie 10, 2005, Secretary Bodnian submitted the Department's Iiizplenzentution Plun to Itizpt-ove Oversight qf'Nucleur Operutions in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004- I , Oversight qf Complex, High-Hrrzurd Nucleur Openrtiotzs. Section 5.3 of the Implementation Plan (IP) addresses Revitalizing Integruted SU/i-'ty Munagernent Implementution, and Subsection 5.3.2 addresses Work Plunning mil Work Control ut the Activity Level. Commitment 23 of the 1P requires development of site office action plans to improve the consistency and reliability of work

236

Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

Not Available

1993-05-01T23:59:59.000Z

237

Quality Work Plan Update  

Energy Savers [EERE]

resources and quality assurance Improving long term sustainability by building the foundation of the national industry with WAP at the core 2 Responding to Network Concerns...

238

September 13, 2011, Federal Technical Capability Program Face to Face Meeting … Presentation: FY 2011 Operational Plan Goal Status for Goal 2  

Broader source: Energy.gov (indexed) [DOE]

f f Functional Area Qualification Standards Enhancements Deborah Monette, Champion Mark Alsdorf, Carol Ingram, Barry Weaver Team Leaders  Status: ◦ Developed FTCP Issue Paper FTCP-10-004  SME definition/process  Evaluate/recommend "expert"-level definition/use  Define and evaluate criteria for provisional qualification  Recommendations:  Recommendations: 1. Accept SME definition/process from FTCP FY09 Operational Plan Goal 3 2. FTCP decision needed on expert-level knowledge definition in FAQSs 1. delete all reference to any competency knowledge level in FAQSs, d l ll f l l k l d 2. delete all reference to expert-level knowledge requirements in FAQSs, 3. retain the FAQS expert-level definition as written, 4. modify the FAQS expert-level definition to read "Expert level is defined as a

239

Nuclear Fuels Storage and Transportation Planning Project (NFST...  

Office of Environmental Management (EM)

Nuclear Fuels Storage and Transportation Planning Project (NFST) Program Status Nuclear Fuels Storage and Transportation Planning Project (NFST) Program Status Presentation made by...

240

Comprehensive work plan for Building 3001 storage canal at the Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This Comprehensive Work Plan describes the method of accomplishment to replace the shielding protection of the water in the canal with a controlled low strength material (CLSM) 4. The canal was used during the operation of the Oak Ridge Graphite Reactor in the 1940s and 1950s to transport spent fuel slugs and irradiated test materials from the reactor, under water to the hot cell in Building 3019 for further processing, packaging, and handling. After the reactor was shut down, the canal was used until 1990 to store some irradiated materials until they could be transferred to a Solid Waste Storage Area. This task has the following objectives and components: (1) minimize potential future risk to human health and the environment; (2) reduce surveillance and maintenance cost of the canal; (3) perform site preparation activities; (4) replace the water in the canal with a solid CLSM; (5) pump the water to the Process Waste Treatment System (PWTS) for further processing at the same rate that the CLSM is pumped under the water; (6) remove the water using a process that will protect the workers and the public in the visitors area from contamination while the CLSM is being pumped underneath the water; (7) painting a protective coating material over the CLSM after the CLSM has cured.

NONE

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports  

SciTech Connect (OSTI)

This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.

NONE

1990-11-01T23:59:59.000Z

242

Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect (OSTI)

Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

Not Available

1993-08-01T23:59:59.000Z

243

Task Plans  

Broader source: Energy.gov (indexed) [DOE]

Task Plans Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting. Task Plan Number/Title DOE Lead Staff Last Update Comment Status/ New No. After 7/27/00 GP-1, Section 180(c) Coordination (begun 1/96) C. Macaluso 7/98 DOE published a Revised Proposed Policy and Procedures in April 1998; no final policy will be issued until a definitive date for NWPA shipments is determined, based on site suitability or other legislative direction. To the extent that any issues related to Section 180(c) arise in TEC meetings, they are being discussed in the context of the consolidated grant topic group which is covered by another task plan. Closed

244

Work plan for vibration cable re-route and water flush system modifications for 107-AN mixer pump  

SciTech Connect (OSTI)

A mixer pump (75 horsepower Hazleton submersible) is to be installed in the central pump pit of Double-Shell Tank 241-AN-107 for the Caustic Addition Project. The mixer pump will be used as a platform to inject, mix, and entrain caustic with the waste, in order to bring the waste hydroxyl ion concentration into compliance with Tank Farm operating specifications. Testing of the mixer pump and caustic addition system revealed that the mixer pump`s vibration cable picks up electromagnetic interference from the motor power cable during variable speed operation of the pump. Also, it was noted that the mixer pump`s water flush system may not be as effective as desired. Ergo this work plan for improving the operation of these mixer pump subsystems. A new vibration cable shall be routed entirely outside the mixer pump support column pipe, up thru a new penetration in the pump mounting flange. The existing penetration in the side of the pipe is to be plugged. Increasing the distance between power and instrument cables may reduce or eliminate electromagnetic interference to the vibration monitor. The mixer pump water flush system shall be modified to allow pressure isolation of individual branches. A header is to be installed on the middle section of the support column. Each branch (there are three) shall contain a solenoid valve (normally open) to control flow into the branch. The solenoid cables shall be routed up thru three new penetrations in the pump mounting flange to a new electrical box mounted on the flange. The existing flush piping to the inlet screen will remain but the continuation of the flush piping to the pump discharge nozzles is to be removed and the tee plugged. New stainless steel tubing is to be run down to the pump discharge nozzles. Pressure isolation of individual branches will maximize the flush system`s effectiveness at blasting potential sediment clogs out of the pump discharge nozzles.

Leshikar, G.A.

1995-04-14T23:59:59.000Z

245

Parallel-beam imaging at the ESRF beamline ID19: current status and plans for the future  

SciTech Connect (OSTI)

The ESRF synchrotron beamline ID19, dedicated to full-field parallel-beam imaging techniques such as phase-contrast and absorption microtomography and X-ray topography, is one of the most versatile instruments of its kind. This paper presents key characteristics of ID19 in its present form, names examples for research and development performed on the beamline, and outlines the plans for an upgrade on the beamline in coming years, to adapt to the growing needs of the user community. The technical goals envisioned include an increase in available beam size and maximum photon energy, and a substantial increase in flux density for applications using beams of small and intermediate size.

Weitkamp, T.; Tafforeau, P.; Boller, E.; Cloetens, P.; Valade, J.-P.; Bernard, P.; Baruchel, J. [European Synchrotron Radiation Facility (ESRF), BP 220, 38043 Grenoble (France); Peyrin, F. [European Synchrotron Radiation Facility (ESRF), BP 220, 38043 Grenoble (France); Creatis / INSA Lyon (France); Ludwig, W. [European Synchrotron Radiation Facility (ESRF), BP 220, 38043 Grenoble (France); INSA Lyon (France); Helfen, L. [European Synchrotron Radiation Facility (ESRF), BP 220, 38043 Grenoble (France); ISS / ANKA Light Source, Forschungszentrum Karlsruhe / KIT, Karlsruhe (Germany)

2010-06-23T23:59:59.000Z

246

The ASTRI Project: prototype status and future plans for a Cherenkov dual-mirror small-telescope array  

E-Print Network [OSTI]

ASTRI ("Astrofisica con Specchi a Tecnologia Replicante Italiana") is a flagship project of the Italian Ministry of Education, University and Research. Within this framework, INAF is currently developing a wide field of view (9.6 degrees in diameter) end-to-end prototype of the CTA small-size telescope (SST), devoted to the investigation of the energy range from a fraction of TeV up to tens of TeVs, and scheduled to start data acquisition in 2014. For the first time, a dual-mirror Schwarzschild-Couder optical design will be adopted on a Cherenkov telescope, in order to obtain a compact optical configuration. A second challenging, but innovative technical solution consists of a modular focal surface camera based on Silicon photo-multipliers with a logical pixel size of 6.2mm x 6.2mm. Here we describe the current status of the project, the expected performance, and its possible evolution in terms of an SST mini-array. This CTA-SST precursor, composed of a few SSTs and developed in collaboration with CTA interna...

Vercellone, S; Maccarone, M C; Di Pierro, F; Vallania, P; Bonnoli, G; Canestrari, R; Pareschi, G; Tosti, G

2013-01-01T23:59:59.000Z

247

The ASTRI project: Prototype status and future plans for a Cherenkov dual-mirror small-telescope array  

Science Journals Connector (OSTI)

ASTRI ("Astrofisica con Specchi a Tecnologia Replicante Italiana") is a flagship project of the Italian Ministry of Education University and Research. Within this framework INAF is currently developing a wide field of view (9.6 in diameter) end-to-end prototype of the CTA smallsize telescope (SST) devoted to the investigation of the energy range from a fraction of TeV up to (possibly) hundreds of TeV and scheduled to start data acquisition in 2014. For the first time a dualmirror Schwarzschild-Couder optical design will be adopted on a Cherenkov telescope in order to obtain a compact (F? = 0.5) optical configuration. A second challenging but innovative technical solution consists of a focal plane camera based on Silicon photo-multipliers with a logical pixel size of 0.17 (6.2mm 6.2mm). We will describe the current status of the project the results obtained so far the expected performance and its possible evolution in terms of a SST mini-array (composed of 5-7 SSTs and developed in collaboration with CTA international partners) which could peruse not only the adopted technological solutions but also address a few scientific test cases.

S. Vercellone; ASTRI Collaboration

2012-01-01T23:59:59.000Z

248

The National Ignition Facility: Status and Plans for Laser Fusion and High-Energy-Density Experimental Studies  

E-Print Network [OSTI]

The National Ignition Facility (NIF) currently under construction at the University of California Lawrence Livermore National Laboratory (LLNL) is a 192-beam, 1.8-megajoule, 500-terawatt, 351-nm laser for inertial confinement fusion (ICF) and high-energy-density experimental studies. NIF is being built by the Department of Energy and the National Nuclear Security Agency (NNSA) to provide an experimental test bed for the U.S. Stockpile Stewardship Program to ensure the country's nuclear deterrent without underground nuclear testing. The experimental program will encompass a wide range of physical phenomena from fusion energy production to materials science. Of the roughly 700 shots available per year, about 10% will be dedicated to basic science research. Laser hardware is modularized into line replaceable units (LRUs) such as deformable mirrors, amplifiers, and multi-function sensor packages that are operated by a distributed computer control system of nearly 60,000 control points. The supervisory control room presents facility-wide status and orchestrates experiments using operating parameters predicted by physics models. A network of several hundred front-end processors (FEPs) implements device control. The object-oriented software system is implemented in the Ada and Java languages and emphasizes CORBA distribution of reusable software objects. NIF is currently scheduled to provide first light in 2004 and will be completed in 2008.

E. I. Moses

2001-11-09T23:59:59.000Z

249

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan  

SciTech Connect (OSTI)

This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

D. E. Shanklin

2006-06-01T23:59:59.000Z

250

RCRA Facility Investigation/Remedial Investigation Work Plan Addendum for the TNX Area Operable Unit Groundwater Radiological Characterization  

SciTech Connect (OSTI)

The purpose of this document is to present a sampling and analysis plan for the Water Table Aquifer for purposes of obtaining additional data for remedial decision-making with respect to radioactive contamination in the groundwater.

Brewer, K.

2002-06-17T23:59:59.000Z

251

Nuclear Crisis Communications: The Plan Worked. A Critique of NRC Communications in the Fukushima Daiichi Reactor Crisis - 12073  

SciTech Connect (OSTI)

'Call the AV-Photo folks and get someone in here to shoot b-roll. We'll never be able to accommodate the network cameras and the only way I can get this to the media is to produce it ourselves'. Eliot Brenner, Director NRC Office of Public Affairs, March 12, 2011. For the past four years we have been speaking to audiences at Waste Management about communications issues. Last year, though we were kept from attending because of the federal budget crisis, our surrogates described to you the lessons the nuclear industry should draw from the BP Gulf oil spill crisis. Those remarks were delivered 11 days before the Fukushima Daiichi tragedy became the nuclear landmark of a generation - an industry changing event with worldwide ramifications, both in science and regulation and in communications. Eliot Brenner cut his teeth on crisis communication in the aviation industry where tragedy unfolds rapidly. He has been a speech-writer to three cabinet secretaries, spokesman for the Federal Aviation Administration and now spokesman for the Nuclear Regulatory Commission since 2004. Holly Harrington manages the NRC crisis response program and has 26 years federal public affairs experience, including eight years at the Federal Emergency Management Agency. Her crisis experience includes the 1989 Loma Prieta earthquake, numerous hurricanes and floods, Sept 11, and, now Fukushima Daiichi. Rebecca Schmidt is a veteran government relations professional whose decades in Washington include service with the House Armed Services Committee, the House Budget Committee and the Secretary of Defense. Collectively, the Offices of Public Affairs and Congressional Affairs conducted the largest outreach for the agency since Three Mile Island. We worked with the basic rule, described to Waste Management last year just 11 days before Fukushima - communicate early, often and clearly. The response - while not without its problems and lessons - went as smoothly as a chaotic event like Fukushima could go. That was due in large measure to the fact that the NRC has a well-tested system of responding to nuclear emergencies, and we followed our plan. (authors)

Brenner, Eliot; Harrington, Holly; Schmidt, Rebecca [U.S. Nuclear Regulatory Commission, Rockville, MD 20852 (United States)

2012-07-01T23:59:59.000Z

252

Renewables Portfolio Standard Procurement Plan  

E-Print Network [OSTI]

Renewables Portfolio Standard Procurement Plan November 2013 Roseville Electric 2090 Hilltop Circle Council will deliberate in public on the RPS Procurement Plan. Information distributed to the City Council regarding Roseville's renewable energy resources procurement status and future plans for consideration

253

Framework and systematic functional criteria for integrated work processes in complex assets: a case study on integrated planning in offshore oil and gas production industry  

Science Journals Connector (OSTI)

Improving the efficiency and cost-effectiveness of the oil and gas (O&G) production process is considered as a critical timely need. The core work processes in particular are targeted for considerable improvements. In this context, development related to integrated planning (IP) is seen as one of the major bases for developing collaborative work processes connecting offshore production and onshore support system. With feasible benefits, for instance, relating to reduction of non-working time, less work repetition, reduction of reduction in production losses, better resource utilisation, etc., a systematic and a complete IP system is today seen as an attractive solution for integrating complex operations and to work smarter. This paper, based on a case study from North Sea oil and gas production environment, describes the systematic functional criteria required as the basis for developing a fully functional IP system.

Yu Bai; Jayantha P. Liyanage

2012-01-01T23:59:59.000Z

254

Safer Work Plan for CAUs 452, 454, 456, and 464 Closure of Historical UST Release Sites Nevada Test Site  

SciTech Connect (OSTI)

This plan addresses characterization and closure of nine underground storage tank petroleum hydrocarbon release sites. The sites are located at the Nevada Test Site in Areas 2, 9, 12, 23, and 25. The underground storage tanks associated with the release sites and addressed by this plan were closed between 1990 and 1996 by the U. S. Department of Energy, Nevada Operations Office. One underground storage tank was closed in place (23-111-1) while the remaining eight were closed by removal. Hydrocarbon releases were identified at each of the sites based upon laboratory analytical data samples collected below the tank bottoms. The objective of this plan is to provide a method for implementing characterization and closure of historical underground storage tank hydrocarbon release sites.

Jerry Bonn

1997-08-01T23:59:59.000Z

255

Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Safety and Security Safety and Security Report to the Secretary on the Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1 February 2011 Office of Health, Safety and Security U.S. Department of Energy Office of Health, Safety and Security HSS Table of Contents 1.0 Introduction ......................................................................................................................... 1 2.0 Department-wide Action Plan for the Columbia Accident and Davis-Besse Event ........... 3 3.0 Comprehensive Operating Experience Program ................................................................. 5

256

Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1  

Broader source: Energy.gov (indexed) [DOE]

Safety and Security Safety and Security Report to the Secretary on the Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1 February 2011 Office of Health, Safety and Security U.S. Department of Energy Office of Health, Safety and Security HSS Table of Contents 1.0 Introduction ......................................................................................................................... 1 2.0 Department-wide Action Plan for the Columbia Accident and Davis-Besse Event ........... 3 3.0 Comprehensive Operating Experience Program ................................................................. 5

257

Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.

NONE

1999-07-15T23:59:59.000Z

258

Site Visit Report - Independent Oversight Review of Work Planning/Execution and the Employee Concerns Program at Paducah, March 20105-10.doc  

Broader source: Energy.gov (indexed) [DOE]

1 1 Site Visit Report - Review of Work Planning/Execution and the Employee Concerns Program at Paducah - March 2010 This report documents the results of a review activity performed by the Office of Health, Safety and Security (HSS) in support of the Department of Energy Office of Environmental Management (EM). The purpose of the review was to support EM management efforts to resolve issues and enhance planned corrective actions for worker safety concerns expressed by several safety professionals at the Paducah Plant. The review was conducted by the Office of Health Safety and Security with an EM observer during the week of February 8, 2010. Observations and recommendations resulting from this review were discussed with representatives of EM's Environmental Management Safety

259

WIPP Status Update | Department of Energy  

Office of Environmental Management (EM)

from May 14-16, 2013 in Buffalo, NY. WIPP Status Update More Documents & Publications EIS-0026-SA-08: Supplemental Analysis Waste Isolation Pilot Plant Status and Plans - 2010...

260

Work Force Restructuring Activities  

Broader source: Energy.gov (indexed) [DOE]

Force Restructuring Activities Force Restructuring Activities December 10, 2008 Note: Current updates are in bold # Planned Site/Contractor HQ Approved Separations Status General * LM has finalized the compilation of contractor management team separation data for the end of FY07 actuals and end of FY08 and FY09 projections. LM has submitted to Congress the FY 2007 Annual Report on contractor work force restructuring activities. The report has been posted to the LM website. *LM conducted a DOE complex-wide data call to the Field and Operations offices for DOE Contractor Management teams to provide, by program, actual contractor separation data for the end of FY 2008 and projections for the end of FY 2009 and FY 2010. The data will be used to keep senior management informed of upcoming large WFR actions.

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Working Copy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE/WIPP-99-2286 Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan Revision 7 U.S. Department of Energy December 2013 This document supersedes DOE/WIPP-99-2286, Rev. 6. Working Copy Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan DOE/WIPP-99-2286, Rev. 7 2 TABLE OF CONTENTSCHANGE HISTORY SUMMARY .............................................. 3 ACRONYMS AND ABBREVIATIONS ............................................................................ 4 1.0 INTRODUCTION .................................................................................................. 6 2.0 NOTIFICATION OR REPORTING REQUIREMENTS AND COMMITMENTS ..... 7

262

Environmental assessment for transuranic waste work-off plan, Los Alamos National Laboratory. Rough draft: Final report  

SciTech Connect (OSTI)

The Los Alamos National Laboratory (LANL) generates transuranic (TRU) waste in a variety of programs related to national defense. TRU waste is a specific class of radioactive waste requiring permanent isolation. Most defense-related TRU waste will be permanently disposed of in the Waste Isolation Pilot Plant (WIPP). WIPP is a deep geologic repository located in southeastern New Mexico and is now in the testing phase of development. All waste received by Wipp must conform with established Waste Acceptance Criteria (WAC). The purpose of the proposed action is to retrieve stored TRU waste and prepare the waste for shipment to and disposal WIPP. Stored TRU waste LANL is represented by four waste forms. The facilities necessary for work-off activities are tailored to the treatment and preparation of these four waste forms. Preparation activities for newly generated TRU waste are also covered by this action.

Not Available

1990-10-26T23:59:59.000Z

263

Work Address:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BO SAULSBURY BO SAULSBURY Work Address: Home Address: Oak Ridge National Laboratory 12952 Buckley Road National Transportation Research Center Knoxville, TN 37934 Building NTRC-2, Room 118 (865) 288-0750 Oak Ridge, TN 37831-6479 (865) 574-4694 saulsburyjw@ornl.gov Technical Specialties: Land use planning Environmental and socioeconomic impact assessment National Environmental Policy Act (NEPA) project management Vehicle fuel economy Education: 1986 B. A., History (minors in English and Business), The University of Tennessee 1989 M. S., Planning, The University of Tennessee (Thesis title: Land Use Compatibility Planning for Airfield Environs: Intergovernmental Cooperation to Protect Land Users From the Effects of Aircraft Operations)

264

Technology Survey to Support Revision to the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit at the U.S. Department of Energys Hanford Site  

SciTech Connect (OSTI)

A survey of technologies was conducted to provide information for a Data Quality Objectives process being conducted to support revision of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit. The technology survey considered remediation and characterization technologies. This effort was conducted to address, in part, comments on the previous version of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit as documented in 200SW1 and 200SW2 Collaborative Workshops?Agreement, Completion Matrix, and Supporting Documentation. By providing a thorough survey of remediation and characterization options, this report is intended to enable the subsequent data quality objectives and work plan revision processes to consider the full range of potential alternatives for planning of the Remedial Investigation/Feasibility Study activities.

Truex, Michael J.; Johnson, Christian D.; Nimmons, Michael J.

2007-09-25T23:59:59.000Z

265

July 24, 2006, Department letter providing status and path forward for the 2004-1 implementation plan, Oversight of Complex, High-Hazard Nuclear Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

July 24, 2006 July 24, 2006 The Honorable A. J. Eggenberger Chairman Defense Nuclear Facilities Safety Board 625 Indiana Avenue, NW, Suite 700 Washington, DC 20004-294 1 Dear Mr. Chairman: In June 2005, I provided you with a copy of the Department's revised Implementation Plan to Improve Oversight of Nuclear Operations in response to Board recommendation 2004- 1 . Since that time, the Department has completed numerous planned actions and has learned from this experience how best to sustain real improvement in this area. Based on the feedback to date, we are preparing to make a course correction on our implementation plan to improve its effectiveness and to bolster line management accountability. To this end, we plan to revise our 2004-1 implementation plan and provide you with this revision by

266

Climate VISION: Private Sector Initiatives: Semiconductors: Work...  

Office of Scientific and Technical Information (OSTI)

Plans The Semiconductor Industry Association has finalized its work plan with the collaboration of EPA. The plan describes actions the industry intends to take to achieve its...

267

Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste fadities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCIA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RIFA)/RCRA Facility Investigation (RFI)/Coffective Measures Study (CMS)/Corrective Measures Implementation process. Under CERCLA, the actions follow the Pre@ary Assessment/Site Investigation (PA/Sl) Remedial Investigation Feasibility Study (RI/FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCIA into an RI Work Plan for the lint phase of characterization of Bear Creek Valley (BCV) Operable Unit (OU) 4.

Not Available

1992-12-01T23:59:59.000Z

268

Final work plan : phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Montgomery City, Missouri.  

SciTech Connect (OSTI)

From September 1949 until September 1966, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) leased property at the southeastern end of Montgomery City, Missouri, for the operation of a grain storage facility. During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In January 2000, carbon tetrachloride was detected in a soil sample (220 {micro}g/kg) and two soil gas samples (58 {micro}g/m{sup 3} and 550 {micro}g/m{sup 3}) collected at the former CCC/USDA facility, as a result of a pre-CERCLIS site screening investigation (SSI) performed by TN & Associates, Inc., on behalf of the U.S. Environmental Protection Agency (EPA), Region VII (MoDNR 2001). In June 2001, the Missouri Department of Natural Resources (MoDNR) conducted further sampling of the soils and groundwater at the former CCC/USDA facility as part of a preliminary assessment/site inspection (PA/SI). The MoDNR confirmed the presence of carbon tetrachloride (at a maximum identified concentration of 2,810 {micro}g/kg) and chloroform (maximum 82 {micro}g/kg) in the soils and also detected carbon tetrachloride and chloroform (42.2 {micro}g/L and 58.4 {micro}g/L, respectively) in a groundwater sample collected at the former facility (MoDNR 2001). The carbon tetrachloride levels identified in the soils and groundwater are above the default target level (DTL) values established by the MoDNR for this contaminant in soils of all types (79.6 {micro}g/kg) and in groundwater (5.0 {micro}g/L), as outlined in Missouri Risk-Based Corrective Action (MRBCA): Departmental Technical Guidance (MoDNR 2006a). The corresponding MRBCA DTL values for chloroform are 76.6 {micro}g/kg in soils of all types and 80 {micro}g/L in groundwater. Because the observed contamination at Montgomery City might be linked to the past use of carbon tetrachloride-based fumigants at its former grain storage facility, the CCC/USDA will conduct investigations to (1) characterize the source(s), extent, and factors controlling the possible subsurface distribution and movement of carbon tetrachloride at the Montgomery City site and (2) evaluate the health and environmental threats potentially represented by the contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigations at Montgomery City will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Montgomery City will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Montgomery City investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Montgomery City site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne has issued a Provisional Master Work Plan (PMWP; Argonne 2007) that has been reviewed and approved by the MoDNR for current use. The PMWP (Argonne 2007) provides detailed information and guidance on the investigative technologies, analytical methodologies, qua

LaFreniere, L. M.; Environmental Science Division

2010-08-16T23:59:59.000Z

269

2010 Annual Planning Summary for Civilian Radioactive Waste Management...  

Broader source: Energy.gov (indexed) [DOE]

Civilian Radioactive Waste Management (CRWM) 2010 Annual Planning Summary for Civilian Radioactive Waste Management (CRWM) Annual Planning Summaries briefly describe the status of...

270

Moral Status  

E-Print Network [OSTI]

Chapters One through Three present the following view: (i) I explain moral status as follows: something has moral status just in case we have reasons not to cause harms to it simply in virtue of the badness of the harms ...

Harman, Elizabeth, 1975-

2003-01-01T23:59:59.000Z

271

Live Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

For Users For Users Live Status Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status PDSF Monitoring Science Gateway Status Now Computing Highlights My NERSC Getting Started Computational Systems Data & File Systems Network Connections Queues and Scheduling Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612

272

Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

Not Available

1993-09-01T23:59:59.000Z

273

RCRA Groundwater Monitoring Plan for Single-Shell Tank Waste Management Area A-AX at the Hanford Site  

SciTech Connect (OSTI)

This document describes the interim status groundwater monitoring plan for Waste Management Area A-AX.

Narbutovskih, Susan M.; Horton, Duane G.

2001-01-18T23:59:59.000Z

274

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

275

Live Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status PDSF Monitoring Science Gateway Status Now Computing Highlights My NERSC Getting Started Computational Systems Data & File Systems Network Connections Queues and Scheduling Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov

276

May 15, 2012, Federal Technical Capability Program Face to Face Meeting … Presentation: FY 2012 Operational Plan Goal Objective 4 Status  

Broader source: Energy.gov (indexed) [DOE]

Plan Plan Goal 1 Objective 4 Goal 1 Objective 4 Expert-Level Discussion Expert-Level Discussion  FTCP Issue Paper, FTCP-10-004, Clarify  FTCP Issue Paper, FTCP 10 004, Clarify Qualification Process » Re-evaluate the definition of expert level in functional area qualification standards. » Focused on one issue, the use of the term "expert" in the TQP C id i f h i i i di d f » Consideration of the issue raises a question regarding need for knowledge level in FAQS competencies » Team decided, based on feedback, to leave the knowledge » Team decided, based on feedback, to leave the knowledge level in competency statements alone 2 Expert-Level Discussion  The team recommends that the FTC Panel decide  The team recommends that the FTC Panel decide which of the following approaches best meets the

277

White Paper on Energy Efficiency Status of Energy-Using Products in China  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

White Paper on Energy Efficiency Status of Energy-Using Products in China White Paper on Energy Efficiency Status of Energy-Using Products in China (2012) Title White Paper on Energy Efficiency Status of Energy-Using Products in China (2012) Publication Type Report Year of Publication 2012 Authors Zhou, Nan, John Romankiewicz, and David Fridley Date Published 06/2012 Publisher Lawrence Berkeley National Laboratory Keywords china, china energy, china energy group, energy analysis and environmental impacts department, energy efficiency, energy-using product, policy studies Abstract 2011 is the first year of the 12th Five-Year Plan and, as such, it is a crucial year to push forwardthe work of energy conservation and emissions reduction. Important large-scale energyconservation policies issued in 2011 include Outline of the 12th Five-year Plan for NationalEconomic and Social Development of The People's Republic of China (the "Plan") and Notice ofthe State Council on Issuing the Comprehensive Work Proposal for Energy Conservation andEmission Reduction during the 12th Five-Year Plan Period (GF (2011) No. 26) (the "Proposal").These two policies have established strategic objectives for energy conservation during the12th Five-Year Plan in China, and they have also identified the key tasks and direction of energyefficiency programs for energy-using products.

278

Renewable Electricity Working Group Presentation  

U.S. Energy Information Administration (EIA) Indexed Site

Renewable Electricity Working Group Chris Namovicz, Renewable Electricity Analysis Team July 9, 2013 Agenda * Review status of AEO 2013 * Discuss new model updates and development...

279

Work with Biological Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal...

280

FTCP Plans & Reports | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Plans & Reports Plans & Reports FTCP Plans & Reports Biennial Report FTCP Biennial Report - Calendar Years 2011-2012 FTCP Biennial Report - Calendar Years 2009-2010 Annual Reports FTCP Annual Report - Calendar Year 2008 FTCP Annual Report - Calendar Year 2007 FTCP Annual Report - Fiscal Year 2004 FTCP Annual Report - Fiscal Year 2002 Status Report FTCP Senior Technical Safety Manager (STSM) Status Report Annual Plans FTCP Annual Plan - Fiscal Year 2005 FTCP Annual Plan - Fiscal Year 2004 FTCP Annual Plan - Fiscal Year 2003 FTCP Annual Plan - Fiscal Year 2002 Operational Plans FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 FTCP OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plan science-innovationassetsimagesicon-science.jpg Strategic Plan x Strategic Plan Los Alamos National Laboratory Strategic Plan - 2014 (pdf) Our Strategic Plan...

282

Waste Management Quality Assurance Plan  

E-Print Network [OSTI]

PUB-5352, Rev. 6 WM QA Plan Review and approval of changesand review of procedures, work plans, instructions, reports,Plans, Instructions and Reports9 4.1.2 Procedure Review and

Waste Management Group

2006-01-01T23:59:59.000Z

283

QEP WORKING GROUP CHARGES Assessment Working Group  

E-Print Network [OSTI]

. (Standard 2.12) During Phase I of the planning process, members of the Assessment Working Group with the institution's strategic plan, a review of the literature, definition of student learning appropriate related to goals. (Handbook for Review Committees, Standards 2.12 and 3.3.2) During Phase I

Liu, Paul

284

Sustainable NREL - Site Sustainability Plan FY 2015 (Management Publication)  

SciTech Connect (OSTI)

NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

Not Available

2015-01-01T23:59:59.000Z

285

Status and Prospects of the Global Automotive Fuel Cell Industry and Plans for Deployment of Fuel Cell Vehicles and Hydrogen Refueling Infrastructure  

SciTech Connect (OSTI)

Automobile manufacturers leading the development of mass-market fuel cell vehicles (FCVs) were interviewed in Japan, Korea, Germany and the United States. There is general agreement that the performance of FCVs with respect to durability, cold start, packaging, acceleration, refueling time and range has progressed to the point where vehicles that could be brought to market in 2015 will satisfy customer expectations. However, cost and the lack of refueling infrastructure remain significant barriers. Costs have been dramatically reduced over the past decade, yet are still about twice what appears to be needed for sustainable market success. While all four countries have plans for the early deployment of hydrogen refueling infrastructure, the roles of government, industry and the public in creating a viable hydrogen refueling infrastructure remain unresolved. The existence of an adequate refueling infrastructure and supporting government policies are likely to be the critical factors that determine when and where hydrogen FCVs are brought to market.

Greene, David L [ORNL; Duleep, Gopal [HD Systems

2013-06-01T23:59:59.000Z

286

Selection of deposystem for heterogeneity research. Status report. Project BE1, Task 1, Milestone B in FY86 annual plan dated April 1986  

SciTech Connect (OSTI)

Five criteria were established for selecting a depositional environment to analyze to develop a methodology for constructing quantitative models of reservoir heterogeneities. The criteria are (1) the deposystem is an economically important oil reservoir, (2) reservoirs comprised of the deposystem are EOR candidates, (3) the productive formation is exposed near a producing field, (4) subsurface data for the producing field are available to NIPER, and (5) the producing field has an EOR project. Two depositional environments satisfy these criteria: barrier island/strandplain and shelf sand ridge deposits. Results of a survey of 77 fields producing from barrier island/strandplain deposits and 22 from shelf deposits indicate that six barrier fields and two shelf fields are US giant oilfields (ultimate recovery >100 million barrels). Ultimate recoveries from two fields producing from combined barrier island strandplain deposits have been estimated at >500 million barrels. EOR projects have been conducted in 22 barrier island strandplain reservoirs and 4 shelf reservoirs. Residual oil saturation after primary and secondary recovery in the eight barrier/strandplain reservoirs sampled, ranges from 31.5 to 55%, averaging 38.7%. Insufficient data exist for shelf sand ridge reservoirs to obtain comparative figures. These depositional environments also satisfy the above-mentioned criteria 3 to 5. Bell Creek field produces from a barrier island/strandplain deposit which crops out nearby. Subsurface data and data on two micellar-polymer pilot projects implemented in the field are available in Department of Energy reports. Teapot Dome (NPR-3) produces from a shelf sand ridge deposit which is exposed 5 miles from the reservoir. The final selection of a reservoir for study will be submitted in a status report due September 30, 1986. 10 refs., 1 fig., 5 tabs.

Jackson, S.R.

1986-06-01T23:59:59.000Z

287

SUMMARY PLAN DESCRIPTION Plan Name: MCWAH Vision Plan [Plan # 505  

E-Print Network [OSTI]

to pay for such coverage. Review this summary plan description and the documents governing the planSUMMARY PLAN DESCRIPTION Plan Name: MCWAH Vision Plan [Plan # 505] Plan Type: Group Vision Insurance Plan Year: July 1 ­ June 30 Employer\\Policyholder\\Plan Administrator\\Plan Sponsor: Medical College

288

SMARTS status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SMARTS INSTRUMENT STATUS SMARTS INSTRUMENT STATUS Instrument Status (Last updated: 2014/01/11 12:06:58) Run Number: 87401 Title: Sample1 Pretested [4.06,150.00,-0.75,45.00] Run Status: running Last Script Activity: 2014/01/11 11:52:36: Start run 87401; mah 1200000 move 4.06 150.00 -0.75 45.00 View full script Next Script Command: mah 1200000 move -0.75 120.00 -0.60 45.00 Proposal#: 4808 Sample#: 977 MAH: 837309 Monitor: 306052 Beam Current: 100 Shutter Status: OPEN Used disk space on /home: 52% Used disk space on /disk2: 74% Crate Status smartsdaq1 smartsdaq2 smartsdaq3 smartsdaq4 smartsdaq5 T0's in Run 16946 16959 16971 16984 16997 T0's Processed 16946 16959 16971 16984 16997 Events 726326 649097 794699 702610 3750460 Events/T0 42.86 38.27 46.83 41.37 220.65

289

UESC Status Data Collection and Analysis  

Broader source: Energy.gov [DOE]

Presentation covers the UESC status data collection and analysis, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

290

Small Business Status  

Broader source: Energy.gov (indexed) [DOE]

Impact of Teaming Arrangements on Impact of Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a myriad of capabilities on the part of offerors, which might result in teaming arrangements or joint ventures being formed. Given this, the Department believes that potential offerors should be aware of the Small Business Administration's regulations regarding affiliation. As such, DOE will include the following provision in solicitations where it expects teaming or joint ventures to propose. GUIDANCE FOR PROSPECTIVE OFFERORS - IMPACT OF TEAMING ARRANGEMENTS ON SMALL BUSINESS STATUS (a) This procurement has been set aside for small business. In order to ensure that award

291

Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Technical Plan  

Broader source: Energy.gov [DOE]

The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

292

Bicycle Master Plan Acknowledgments  

E-Print Network [OSTI]

Bicycle Master Plan #12;Acknowledgments Many people contributed to the development of the APU Bicycle Master Plan by providing valuable input, comments and review of the document. Different departments of APU will have to work together to implement the plan and to further encourage bicycling

Scheel, David

293

Automation Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NREL Manufacturing R&D Workshop NREL Manufacturing R&D Workshop NREL H2/FC Manufacturing R&D Workshop Automation Status Garry Sperrick garry@sperkllc.com 585-259-0311 August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Presentation Overview ƒ Brief Introduction ƒ DOE / NREL - Review & Discussion ƒ Automation Platforms ƒ Automation Processes ƒ Automation Considerations of the Manufacturer ƒ Manufacturer and the Supplier ƒ Three (3) Automation Programs Following these Guidelines ƒ Automotive Component Manufacturing ƒ Medical Manufacturing ƒ Membrane Electrode Assembly Manufacturing ƒ Hypothetical Fuel Cell Manufacturing Platforms August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Professional Bio ƒ Automation Technician - Mobil Chemical

294

Hybrid Arc Cell Studies: Status Report  

SciTech Connect (OSTI)

I report on the status, at the end of FY12, of the studies of an arc cell for a hybrid synchrotron accelerating from 375 GeV/c to 750 GeV/c in momentum. Garren produced a complete lattice that gives a good outline of the structure of a hybrid synchrotron lattice. It is, however, lacking in some details: it does not maintain a constant time of flight, it lacks chromaticity correction, its cell structure is not ideal for removing aberrations from chromaticity correction, and it probably needs more space between magnets. I have begun studying cell structures for the arc cells to optimize the lattice performance and cost. I present some preliminary results for two magnets per half cell. I then discuss difficulties encountered, some preliminary attempts at resolving them, and the future plans for this work.

Berg J. S.

2012-09-28T23:59:59.000Z

295

Climate VISION: Private Sector Initiatives: Oil and Gas: Work...  

Office of Scientific and Technical Information (OSTI)

Work Plans API has developed a work plan based on API's commitment letter and the Climate Challenge Program which addresses the overall elements of the Climate VISION program...

296

Current Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Current Status Current Status > Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player July 31, 1942 The Army Corp of Engineers leases 1,025 acres of the Cook County Forest Preserve to build a research facility. November 1942 Under the direction of Enrico Fermi, a group of scientists at the University of Chicago begin building Chicago Pile-1 (CP-1). Security and secracy were essential. December 2, 1942 Enrico Fermi's team creates the world's first self-sustaining nuclear chain reaction using the CP-1 reactor under Stagg Field at the University of Chicago. CP-1 1943 The experiments under Stagg Field shut down, and the scientists move to a 19 acre section of the leased forest preserve, known as Site A. CP-1 is reconstructed and modified at Site A and renamed Chicago Pile 2 (CP-2).

297

STAFFREPORT Prepared for the Bioenergy Interagency Working Group  

E-Print Network [OSTI]

STAFFREPORT Prepared for the Bioenergy Interagency Working Group: Air Resources Board 2010 2009 PROGRESS TO PLAN BIOENERGY ACTION PLAN FOR CALIFORNIA CALIFORNIA ENERGY COMMISSION #12, and et. al. 2010. 2009 Progress to Plan Bioenergy Action Plan for California. California Energy

298

DIIID National Fusion Program Status and Plans  

E-Print Network [OSTI]

-NET (Garching, Germany) FOM (Utrecht, The Netherlands) Frascati (Frascati, Lazio, Italy) FZ (Jülich, GermanyMadrid Culham Goteberg Helsinki Utrecht Kiel Wales Glasgow Jülich Lisbon, Portugal Montreal Alberta Seattle Salt) Moscow State (Moscow) St. Petersburg State Poly (St. Petersburg) Triniti (Troitsk) Inst. of Applied

299

2010 Annual Planning Summary for Stanford Linear Accelerator...  

Office of Environmental Management (EM)

Accelerator Center Site Office (SLAC) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12...

300

2010 Annual Planning Summary for Savannah River Operations Office...  

Energy Savers [EERE]

Savannah River Operations Office (SRS) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12...

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Hopper Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on. Read More » Hopper Featured Announcements A list of key Hopper announcements and system changes. Read More » Hopper Email Announcements Archive An archive of email announcements sent to NERSC users regarding Hopper. Read More » Announcements Hopper OS upgrade and new SW set to default next Wed, Feb 27 21 February 2013, 10:29 am Hopper scheduled maintenance tomorrow (Sept 19) and /project outage 18 September 2012, 4:46 pm Please use "gres" settings in your batch scripts 4 September 2012, 2:03 pm high thruput queue now available on Hopper 30 August 2012, 4:27 pm max walltime for low queue is increased to 24 hrs on Hopper

302

Tevatron status  

SciTech Connect (OSTI)

The Fermilab Tevatron is both the world's highest energy accelerator system and first large-scale superconducting synchrotron. Since Tevatron commissioning in July 1983, the accelerator has operated in 1984, 1985 and 1987 with extracted beams of 800 GeV for three runs of fixed target physics, and in 1987, and 1988, with proton-antiproton colliding beams at 900 /times/ 900 GeV. This paper will focus on the collider operation of the Tevatron: its present status and the outlook for its longer-term future evolution. 18 refs., 3 figs., 2 tabs.

Dugan, G.

1989-03-01T23:59:59.000Z

303

Work Authorization System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. Cancels DOE O 412.1.

2005-04-21T23:59:59.000Z

304

Work Authorization System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A.

2005-04-21T23:59:59.000Z

305

PLANNING UNIT October 26, 2009  

E-Print Network [OSTI]

PLANNING UNIT October 26, 2009 Advertisement for TRIPP Chair in the Institute A large number research work in the area of Transportation Planning for control of accidents and pollution with special

Prasad, Sanjiva

306

Annual Planning Summaries: 2010 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0 0 Annual Planning Summaries: 2010 February 24, 2010 2010 Annual Planning Summary for Energy Efficiency and Renewable Energy Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. February 2, 2010 2010 Annual Planning Summary for Chief Financial Officer (CFO) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. February 1, 2010 2010 Annual Planning Summary for Oak Ridge (OR)

307

IDC Integrated Master Plan.  

SciTech Connect (OSTI)

This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

Clifford, David J.; Harris, James M.

2014-12-01T23:59:59.000Z

308

CPP Status  

Broader source: Energy.gov (indexed) [DOE]

Protection Program (CPP) Protection Program (CPP) Status FY10 Jeff Mauth Project Manager May 19, 2010 1 Agenda  Sensor Integration  Sensor Deployment  CPP Portal  Mercury  Parting Comments  Questions 2 Sensor Integration Task Lead: Greg Thomas  Flo and Flower: Session Data  Snort: Network Intrusion Detection Data  AMP: Various Types of Network Data  PopQuiz: Various Types of Network Data  T3: Data Movement and Sensor Control 3 Sensor Deployment Task Lead: Liz Faultersack Certification and Accreditation Continued Expansion Hardware Refresh to Begin FY11 9 CPP Portal Task lead: Brett Didier Features Sharing Policy Data and Releases 13 CPP Portal Provides DOE cyber analysts access to CPP collected "DOE enterprise" data

309

STATUS OF THE NRC'S DECOMMISSIONING PROGRAM  

SciTech Connect (OSTI)

On July 21, 1997, the U.S. Nuclear Regulatory Commission published the final rule on Radiological Criteria for License Termination (the License Termination Rule) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program. It discusses the status of permanently shut-down commercial power reactors, complex decommissioning sites, and sites listed in the Site Decommissioning Management Plan. The paper provides the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including a Standard Review Plan for evaluating plans and information submitted by licensees to support the decommissioning of nuclear facilities and the D and D Screen software for determining the potential doses from residual radioactivity. Finally, it discusses the status of the staff's current efforts to streamline the decommissioning process.

Orlando, D. A.; Camper, L. W.; Buckley, J.

2002-02-25T23:59:59.000Z

310

American particle and nuclear physics planning  

SciTech Connect (OSTI)

In the United States the planning process relevant to future deep inelastic scattering involves both the high energy physics and nuclear physics funding and the two communities. In Canada there is no such split between the communities. Within the past two years there have been several planning initiatives and there may be more to come. We review the current status of both the planning and the plans.

Montgomery, Hugh E. [JLAB

2014-10-01T23:59:59.000Z

311

Environmental Impact Statements and Environmental Assessments Status Chart  

Broader source: Energy.gov (indexed) [DOE]

Environmental Impact Statements and Environmental Assessments Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the status of ongoing NEPA documents at the Department of Energy, including the dates of important milestones in the NEPA process and references to more information (updated monthly). This chart represents anticipated activity and is not a commitment for documentation or date. Last Revised: 12/19/2013 StatusChart_December2013revised.pdf More Documents & Publications 2013 Annual Planning Summary for the Western Area Power Administration 2012 Annual Planning Summary for Western Area Power Administration 2011 ANNUAL PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS AGENCY WESTERN AREA POWER ADMINISTRATION

312

ESnet Network Measurement Current Status  

E-Print Network [OSTI]

1 ESnet Network Measurement Current Status Joe Metzger Jan 24th 2008 ESCC meeting Energy SciencesSONAR collaboration focused on dynamic hybrid network issues ­ publication, visualization, and analysis of dynamic Architecture ­ Protocols based on the Open Grid Forum Network Measurement Working Group Schemas · Several

313

National Grid Energy Efficiency Plans  

Broader source: Energy.gov [DOE]

Presentation covers the National Grid Energy Efficiency plans and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

314

Interagency Working Groups (IWGs)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) are the primary USGCRP vehicles for implementing and coordinating research activities within and across agencies. These groups are critical to Program integration and in assessing the Program's progress. The working groups span a wide range of interconnected issues of climate and global change, and address major components of the Earth's environmental and human systems, as well as cross-disciplinary approaches for addressing these issues. IWGs correspond to program functions and are designed to bring agencies together to plan and develop coordinated activities, implement joint activities, and identify and fill gaps in the Program's plans. They allow public officials to communicate with each other on emerging directions within their agencies, on their stakeholder needs, and on best practices learned from agency activities. Together, these functions allow the agencies to work in a more coordinated and effective manner.

315

Project Status  

Broader source: Energy.gov (indexed) [DOE]

Hybrid Generation Simulator Hybrid Generation Simulator HybSim© 1.0 DAVID TRUJILLO SANDIA NATIONAL LABORATORY Presented by Joshua Bartlett - University of Michigan Introduction * HybSim© 1.0 copyrighted 2006 * First license to University of Michigan Introduction HybSim© Model What - "Hybrid Simulator"; Tool designed to evaluate the economic and environmental benefits of adding renewable energy to the fossil fuel generation mix in remote and difficult-accessible locations. Why - Benefits of energy storage, decision analysis, risk analysis, load growth issues, load management, economic analysis, planning (what-ifs) Who - Availability to coops, field techs, project managers, administrative personnel Where - Remote villages, military installations, remote industrial systems; any climate

316

Disclosures due to Health Care Reform Changes Disclosure of Grandfather Status  

E-Print Network [OSTI]

Disclosures due to Health Care Reform Changes Disclosure of Grandfather Status UCSD Medical Center of the Affordable Care Act that apply to other plans. Grandfathered health plans must comply with certain other believes this health plan coverage is a "grandfathered health plan" under the Patient Protection

Gleeson, Joseph G.

317

US/FRG umbrella agreement for cooperation in GCR Development. Fuel, fission products, and graphite subprogram. Quarterly status report, July 1, 1982-September 30, 1982  

SciTech Connect (OSTI)

This report describes the status of the cooperative work being performed in the Fuel, Fission Product, and Graphite Subprogram under the HTR-Implementing Agreement of the United States/Federal Republic of Germany Umbrella Agreement for Cooperation in GCR Development. The status is described relative to the commitments in the Subprogram Plan for Fuel, Fission Products, and Graphite, Revision 5, April 1982. The work described was performed during the period July 1, 1982 through September 30, 1982 in the HTGR Base Technology Program at Oak Ridge National Laboratory, the HTGR Fuel and Plant Technology Programs at General Atomic Company (GA), and the Project HTR-Brennstoffkreislauf of the Entwicklungsgemeinschaft HTR at KFA Julich, HRB Mannheim, HOBEG Hanau, and SIGRI Meitingen. The requirement for and format of this quarterly status report are specified in the HTR Implementing Agreement procedures for cooperation. Responsibility for preparation of the quarterly report alternates between GA and KFA.

Turner, R.F.

1982-10-01T23:59:59.000Z

318

Focus Group Meeting (Activities Status) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

May 19, 2011 Meeting Agenda, Summary and 2011 Directives Reform Status Documents Available for Download Meeting Agenda Meeting Summary and Participants Draft Work Group Matrix Key...

319

ACQUISITION PLANNING  

Office of Environmental Management (EM)

PLANNING Guiding Principles Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory,...

320

STRATEGIC PLAN  

Energy Savers [EERE]

STRATEGIC PLAN 2015 - 2018 Message from the Associate Under Secretary for Environment, Health, Safety and Security I am proud to introduce this strategic plan for the Office of...

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Current status of the RERTR Program  

SciTech Connect (OSTI)

The main purpose of this paper is to review the progress which has been accomplished by the RERTR Program during the past year, the present status of the program, the activities which are now in progress, and the program plans for the coming years. The changes that have taken place in the overall program plan are, in themselves, not very significant. Some activities were found to be somewhat more difficult than expected and required a longer time to complete; others were found to be less difficult than expected and caused opposite readjustments of the program plan. These effects tend to balance each other when the program is considered as a whole.

Travelli, A.

1980-01-01T23:59:59.000Z

322

HSEP Committee 3-Month Work Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and opportunities o Review of contractor programs o What are the implications on safety culture (a measure of safety culture) Topic o o Quality AssuranceQuality Control...

323

Genome in a Bottle Consortium Work Plan  

E-Print Network [OSTI]

lines for whole genome RMs and design synthetic DNA constructs that could will be a set of well-characterized whole genome and synthetic DNA RMs along

324

Groundwater Monitoring Well Installation Work Plan  

E-Print Network [OSTI]

.................................................................................................... 9 4.4 Environmental Management System...................................................................................................................... 1 1.2.1 Water Quality...................................................................................................... 7 3.6 Source of Water

325

Draft Work Plan Environmental Assessment and Characterization  

E-Print Network [OSTI]

.....................................................................................................................16 4.4.2 Site Security

326

Proposed "One EERE" Work Plan Structure  

Energy Savers [EERE]

demonstration resources created through the Better Buildings Alliance http:www4.eere.energy.govallianceactivitiesdemonstrations, Green Proving Ground, http:www.gsa.gov...

327

OutreachCommunicationPlanGeorgiaTech Year 3 Work Plan  

E-Print Network [OSTI]

/A Email if interested Recruited 3 new MBA Directors Clean Cities Partnership / October 15, 2010 Successful - EcoCAR competition overview - Build awareness of AFV and Alternative Technology Vehicles N/A Mailing and Alternative Technology Vehicles N/A Survey general public on overall views of AFV and Alternative Technology

Houston, Paul L.

328

Status of hadronic light-by-light scattering in the muon g-2  

E-Print Network [OSTI]

We give an update on the status of the hadronic light-by-light scattering contribution to the muon g-2. We review recent work by various groups, list some of the open problems and give an outlook on how to better control the uncertainty of this contribution. This is necessary in order to fully profit from planned future muon g-2 experiments to test the Standard Model. Despite some recent developments, we think that the estimate a_{mu}^{HLbL} = (116 \\pm 40) x 10^{-11} still gives a fair description of the current situation.

Andreas Nyffeler

2013-12-17T23:59:59.000Z

329

SNS Operating Status | ORNL Neutron Sciences  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SNS Operating Status Alerts SNS Operating Status Alerts Receive updates about the SNS beam status via text messages to your cell phone and/or e-mail by signing up here. The instrument hall coordinators will communicate any significant beam status changes including beam start, beam down, planned and unplanned outages, and unanticipated schedule changes such as delays. On the registration, enter your e-mail address to receive e-mail updates or to receive text messages enter the information below that is specific to your cell phone provider: Carrier Email to SMS Gateway Alltel [10-digit phone number]@message.alltel.com Example:1234567890@message.alltel.com AT&T (formerly Cingular) [10-digit phone number]@txt.att.net [10-digit phone number]@mms.att.net (MMS) [10-digit phone number]@cingularme.com

330

EMSL Strategic Plan 2008  

SciTech Connect (OSTI)

This Strategic Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

Campbell, Allison A.

2008-08-15T23:59:59.000Z

331

Strategic Plans | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plans Strategic Plans Strategic Plans September 20, 2013 DOE OIG Strategic Plan Fiscal Years 2014 - 2019 The Office of Inspector General's plan to strengthen the integrity, economy, and efficiency of the Department's programs and operations. December 31, 2007 DOE OIG Strategic Plan Fiscal Years 2009 - 2013 This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and performance of the Department's programs and operations. December 31, 2002 DOE OIG Strategic Plan Fiscal Years 2003-2008 This plan represents the Office of the Inspector General's vision and strong commitment for improving the management and performance of the Department of Energy's many programs and operations

332

Alaska Strategic Energy Plan and Planning Handbook  

Broader source: Energy.gov (indexed) [DOE]

Alaska Strategic Energy Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence Ave. SW, Washington DC 20585 | 202-586-1272 energy.gov/indianenergy | indianenergy@hq.doe.gov Alaska Strategic Energy Plan and Planning Handbook ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

333

Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006  

SciTech Connect (OSTI)

This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

R. P. Wells

2007-05-09T23:59:59.000Z

334

Status of the Boeing Dish Engine Critical Component project  

SciTech Connect (OSTI)

The Boeing Company's Dish Engine Critical Component (DECC) project started in April of 1998. It is a continuation of a solar energy program started by McDonnel Douglas (now Boeing) and United Stirling of Sweden in the mid 1980s. The overall objectives, schedule, and status of this project are presented in this paper. The hardware test configuration, hardware background, operation, and test plans are also discussed. A summary is given of the test data, which includes the daily power performance, generated energy, working-gas usage, mirror reflectivity, solar insolation, on-sun track time. Generating time, and system availability. The system performance based upon the present test data is compared to test data from the 1984/88 McDonnel Douglas/United Stirling AB/Southern California Edison test program. The test data shows that the present power, energy, and mirror performance is comparable to when the hardware was first manufactured 14 years ago.

Stone, K.W.; Nelving, H.; Braun, H.W.; Clark, T.B.; Diver, R.B.

1999-07-01T23:59:59.000Z

335

Configuration Management Plan for the Tank Farm Contractor  

SciTech Connect (OSTI)

The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

WEIR, W.R.

2000-04-21T23:59:59.000Z

336

Model Validation Status Review  

SciTech Connect (OSTI)

The primary objective for the Model Validation Status Review was to perform a one-time evaluation of model validation associated with the analysis/model reports (AMRs) containing model input to total-system performance assessment (TSPA) for the Yucca Mountain site recommendation (SR). This review was performed in response to Corrective Action Request BSC-01-C-01 (Clark 2001, Krisha 2001) pursuant to Quality Assurance review findings of an adverse trend in model validation deficiency. The review findings in this report provide the following information which defines the extent of model validation deficiency and the corrective action needed: (1) AMRs that contain or support models are identified, and conversely, for each model the supporting documentation is identified. (2) The use for each model is determined based on whether the output is used directly for TSPA-SR, or for screening (exclusion) of features, events, and processes (FEPs), and the nature of the model output. (3) Two approaches are used to evaluate the extent to which the validation for each model is compliant with AP-3.10Q (Analyses and Models). The approaches differ in regard to whether model validation is achieved within individual AMRs as originally intended, or whether model validation could be readily achieved by incorporating information from other sources. (4) Recommendations are presented for changes to the AMRs, and additional model development activities or data collection, that will remedy model validation review findings, in support of licensing activities. The Model Validation Status Review emphasized those AMRs that support TSPA-SR (CRWMS M&O 2000bl and 2000bm). A series of workshops and teleconferences was held to discuss and integrate the review findings. The review encompassed 125 AMRs (Table 1) plus certain other supporting documents and data needed to assess model validity. The AMRs were grouped in 21 model areas representing the modeling of processes affecting the natural and engineered barriers, plus the TSPA model itself Description of the model areas is provided in Section 3, and the documents reviewed are described in Section 4. The responsible manager for the Model Validation Status Review was the Chief Science Officer (CSO) for Bechtel-SAIC Co. (BSC). The team lead was assigned by the CSO. A total of 32 technical specialists were engaged to evaluate model validation status in the 21 model areas. The technical specialists were generally independent of the work reviewed, meeting technical qualifications as discussed in Section 5.

E.L. Hardin

2001-11-28T23:59:59.000Z

337

UNIVERSITY OF CONNECTICUT SCHOOL OF SOCIAL WORK  

E-Print Network [OSTI]

UNIVERSITY OF CONNECTICUT SCHOOL OF SOCIAL WORK ACADEMIC PLAN 2009 - 2014 #12;A MESSAGE FROM DEAN with Our World, Our People, Our Future: The University of Connecticut Academic Plan 2009 ­ 2014. The University of Connecticut School of Social Work is among the top-ranked schools of social work in the nation

Holsinger, Kent

338

Status of the NRC Decommissioning Program  

SciTech Connect (OSTI)

On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.

Orlando, D. A.; Camper, L.; Buckley, J.; Pogue, E.; Banovac, K.

2003-02-24T23:59:59.000Z

339

EMSL Contribution Plan  

SciTech Connect (OSTI)

This Contribution Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSLs workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSLs long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2 describes EMSLs detailed business plan, including an analysis of opportunity, organizational investments, and actionable milestones.

Campbell, Allison A.

2008-12-01T23:59:59.000Z

340

National Action Plan on Demand Response | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

National Action Plan on Demand Response National Action Plan on Demand Response Presentation-given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008...

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

VPP Participant Status  

Broader source: Energy.gov [DOE]

The VPP Participant Status document lists all the DOE VPP participants and their current status within the VPP Program. Additionally, participant information includes governing program office and estimated number of employees for each participant.

342

UNIT SPECIFIC PLAN FORM INVESTIGATOR INFORMATION  

E-Print Network [OSTI]

performed in your work area. This information is requested to help EHS review your Unit Specific Plan Form or stored in your work areas, a" Standard Operating Procedure" (SOP), Appendix A of the Unit Specific Plan1 UNIT SPECIFIC PLAN FORM INVESTIGATOR INFORMATION Principal Investigator: E-Mail: Department

Maroncelli, Mark

343

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

Prioritization of Facility Hazards Examples Prioritization of Facility Hazards Examples Example 20 7.7 PRELIMINARY HAZARD ANALYSIS Table 7-1 Preliminary Hazard Analysis (PHA) Overview for 779 Cluster's Decommissioning and Dismantlement Major Work Task Hazard Cause Preventive Measures Perform building walkdowns to identify Integrated Work Control Package (IWCP) work steps. Tripping, falling, exposure to chemicals, hazardous substances and / or radioactive materials. Also exposure to noise hazards. No planning, lack of communicating between work groups, improper use of Radiological Work Permits (RWPs), not following room or building instructions.  Develop Activity Hazard Analysis (AHA).  Conduct effective pre-evolution briefings.

344

Climate VISION: Private Sector Initiatives: Electric Power: Work...  

Office of Scientific and Technical Information (OSTI)

Work Plans The power sector, through EPICI, submitted its work plan in the form of a Memorandum of Understanding (MOU) with DOE. The MOU, most recently updated in September 2006,...

345

Heuristic status polling  

DOE Patents [OSTI]

Methods, compute nodes, and computer program products are provided for heuristic status polling of a component in a computing system. Embodiments include receiving, by a polling module from a requesting application, a status request requesting status of a component; determining, by the polling module, whether an activity history for the component satisfies heuristic polling criteria; polling, by the polling module, the component for status if the activity history for the component satisfies the heuristic polling criteria; and not polling, by the polling module, the component for status if the activity history for the component does not satisfy the heuristic criteria.

Archer, Charles J. (Rochester, MN); Blocksome, Michael A. (Rochester, MN); Heidelberger, Philip (Cortlandt Manor, NY); Kumar, Sameer (White Plains, NY); Parker, Jeffrey J. (Rochester, MN); Ratterman, Joseph D. (Rochester, MN)

2011-06-07T23:59:59.000Z

346

Strategic Action Plan  

Broader source: Energy.gov (indexed) [DOE]

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

347

Technical area status report for low-level mixed waste final waste forms. Volume 1  

SciTech Connect (OSTI)

The Final Waste Forms (FWF) Technical Area Status Report (TASR) Working Group, the Vitrification Working Group (WG), and the Performance Standards Working Group were established as subgroups to the FWF Technical Support Group (TSG). The FWF TASR WG is comprised of technical representatives from most of the major DOE sites, the Nuclear Regulatory Commission (NRC), the EPA Office of Solid Waste, and the EPA`s Risk Reduction Engineering Laboratory (RREL). The primary activity of the FWF TASR Working Group was to investigate and report on the current status of FWFs for LLNM in this TASR. The FWF TASR Working Group determined the current status of the development of various waste forms described above by reviewing selected articles and technical reports, summarizing data, and establishing an initial set of FWF characteristics to be used in evaluating candidate FWFS; these characteristics are summarized in Section 2. After an initial review of available information, the FWF TASR Working Group chose to study the following groups of final waste forms: hydraulic cement, sulfur polymer cement, glass, ceramic, and organic binders. The organic binders included polyethylene, bitumen, vinyl ester styrene, epoxy, and urea formaldehyde. Section 3 provides a description of each final waste form. Based on the literature review, the gaps and deficiencies in information were summarized, and conclusions and recommendations were established. The information and data presented in this TASR are intended to assist the FWF Production and Assessment TSG in evaluating the Technical Task Plans (TTPs) submitted to DOE EM-50, and thus provide DOE with the necessary information for their FWF decision-making process. This FWF TASR will also assist the DOE and the MWIP in establishing the most acceptable final waste forms for the various LLMW streams stored at DOE facilities.

Mayberry, J.L.; DeWitt, L.M. [Science Applications International Corp., Idaho Falls, ID (United States); Darnell, R. [EG and G Idaho, Inc., Idaho Falls, ID (United States)] [and others

1993-08-01T23:59:59.000Z

348

Selection of 1998-2003 Technical Assistance Work Products | Department of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Selection Selection of 1998-2003 Technical Assistance Work Products Selection of 1998-2003 Technical Assistance Work Products The following are some Technical Assistance Work Products from 1998-2003. Sponsored Sample Products DOE co-funded report examines the current status of the U.S. Electric Transmission System. Report finds transmission capacity continues to be added at a slower rate than consumer demand is growing. Additional Program-Sponsored Sample Products The Electric Markets Technical Assistance Program is supporting efforts by the Western Governors' Association (WGA), its subsidiary Western Interstate Energy Board (WIEB), and related ad-hoc subregional groups in the West as they work toward greater regional coordination and planning of regional electric infrastructure. See November 2003 presentation for more

349

Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Table of Contents  

Broader source: Energy.gov [DOE]

The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

350

Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Benefits  

Broader source: Energy.gov [DOE]

The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

351

Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan  

Broader source: Energy.gov [DOE]

The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

352

Plan Your Arrival  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Your Arrival Plan Your Arrival Special arrangements and training are required for your first visit. When you complete your APS orientation, you will be issued an APS badge. With this badge you may enter the site at any time. Notify User Office When you know which beamline you'll be using and the date of your beam time, contact the User Office. We will check the status of your request for access and schedule any required orientation and training (630-252-9090, apsuser@aps.anl.gov). If you will arrive outside of normal business hours, you must notify the User Office in advance so we can arrange for gate access. Make Travel Arrangements When the User Office has notified you that you have been approved for access and your training has been scheduled, you may make your travel

353

Proj. Plan Example SEM  

Broader source: Energy.gov (indexed) [DOE]

Project Plan Project Plan December 1997 U. S. DEPARTMENT OF ENERGY Office of the Chief Information Officer and Headquarters Collaboration Group Change Control Page The change control page will be used to record information for controlling and tracking modifications made to this document. Revision Date: 12/15/97 Author: Brian Field a. Section(s): 2.3 Page Number(s): 2-2 through 2-4 Summary of Change(s): Updated roles and responsibilities chart to include known resources. b. Section(s): 3.6 & 3.7 Page Number(s): 3-8 through 3-10 Summary of Change(s): Modified Resource Loading Chart to reflect current estimates. Modified Project/Deliverable Schedule to reflect current status of project. c. Section(s): Page Number(s): Summary of Change(s):

354

Pepco Update on Current Construction Work and Mirant Generation...  

Broader source: Energy.gov (indexed) [DOE]

Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Pepco Update on Current Construction Work and Mirant Generation Needs for...

355

Federal Utility Partnership Working Group 2011 Meeting: Washington...  

Broader source: Energy.gov (indexed) [DOE]

Working Group (FUPWG) meeting-provides an overview of federal government goals and status, Federal Energy Management Program (FEMP) update, and utility energy services...

356

Microsoft Word - Work Authorization Internal to SSRL v03.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

vendors to provide services, the Pre-Work Hazard Analysis (PWHA) Form. Progress and completion status are reported up with comments and suggestions for future activities....

357

Elements of doing work at SSRL (rev  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

follow JHAMs, safety procedures, and work plans (e.g., non-routine JHAMs, equipment lockout procedures, and radiation safety work control forms). 2. Ensure STAs are up to date...

358

Putting Dollars to Work  

E-Print Network [OSTI]

the extent to which bacteria are present. If these data demonstrate the need for an assessment of total maximum daily loads, experts in bacterial source tracking will help plan and imple- ment appropriate follow-up. Dairy Compost Utilization... This project addresses the elevated concentrations of ammonia, nitrogen, phosphorus and fecal bacteria found in parts of the North Bosque River, Upper North Bosque River and Leon River. Texas A&M agricultural scientists are working with composters...

Wythe, Kathy

2006-01-01T23:59:59.000Z

359

W Boson Mass Working Group Report  

SciTech Connect (OSTI)

The W boson mass working group discussed the current status of the W boson mass measurement and the prospects for improving on LEP and Tevatron measurements at the LHC.

Kilgore, W.; Kilgore, W.

2010-06-14T23:59:59.000Z

360

National Action Plan on Demand Response  

Broader source: Energy.gov (indexed) [DOE]

Action Plan on Demand National Action Plan on Demand Action Plan on Demand National Action Plan on Demand Response Response Federal Utilities Partnership Working Group Federal Utilities Partnership Working Group November 18, 2008 November 18, 2008 Daniel Gore Daniel Gore Office of Energy Market Regulation Office of Energy Market Regulation Federal Energy Regulatory Commission Federal Energy Regulatory Commission The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission Presentation Contents Presentation Contents Statutory Requirements Statutory Requirements National Assessment [Study] of Demand Response National Assessment [Study] of Demand Response National Action Plan on Demand Response National Action Plan on Demand Response General Discussion on Demand Response and Energy Outlook

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Policy & Strategic Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Laboratory Directed R&D Laboratory Directed R&D Office of Technology Commercialization and Partnerships Other Information BNL Site Index Can't View PDFs? Policy & Strategic Planning Directorate Policy and Strategic Planning (P&SP) Directorate coordinates development of the Laboratory Strategic Plan and annual business plans at the institutional and organizational Level. This function includes administration of the Laboratory Directed Research and Development (LDRD) program. The Directorate is also responsible for the Laboratory's technology transfer functions, including collaborations with industry and work for others; and for increasing funding from sources other than DOE. Organization Chart (pdf) Top of Page Last Modified: June 4, 2013 Please forward all questions about this site to: Teresa Baker

362

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

363

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

364

Milestone Plan Process Improvement  

Broader source: Energy.gov (indexed) [DOE]

Milestone Plan Process Improvement Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the STRIPES Project Office initiated an in-depth evaluation of the required steps and issues surrounding this process. We concluded that the MP process could be improved for most users by tuning the system configuration. With the approval of both the STRIPES Executive Steering Committee and the STRIPES Project Office, we launched the MP Process Improvement Initiative. After many meetings with members of the STRIPES Team and Working Group, we are ready to "go-live" with this initiative. On October 1 st , 2012 the new MP process will be implemented for use by most field offices.

365

Work Authorization System  

Broader source: Energy.gov (indexed) [DOE]

Washington, D.C. DOE O 412.1A Approved: 4-21-05 This directive was reviewed and certified as current and necessary by Susan J. Grant, Director, Office of Management, Budget and Evaluation/Chief Financial Officer, 4-21-05. SUBJECT: WORK AUTHORIZATION SYSTEM 1. OBJECTIVES. To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. 2. CANCELLATIONS. DOE O 412.1 Work Authorization System, dated 4-20-99. Cancellation of a directive does not, by itself, modify or otherwise affect any contractual

366

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Broader source: Energy.gov (indexed) [DOE]

Communication and Stakeholder Involvement Communication and Stakeholder Involvement Plan Examples Example 49 10.0 COMMUNICATIONS AND PUBLIC INVOLVEMENT The transition of B Plant is a critical element in Hanford's mission of environmental management. The B Plant Transition Project Management Team have made a commitment to open communications throughout transition because effective communications and public involvement are critical success factors for the project. Communications must be living and dynamic, responding to accomplishments and emerging issues or activities. A communications plan will be developed to define specific actions for disseminating information regarding project objectives, strategies, problems/issues, and status, and for developing strategies for soliciting input/involvement throughout the deactivation

367

Plan Providers | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Providers Plan Providers Plan Providers CIGNA Open Access CIGNA POS Express Scripts Prescription Drug Plan (CIGNA Open Access and CIGNA POS)-Members of Express Scripts Online Services are able to: order refill mail service prescriptions check on the status of their mail service prescriptions order mail service envelopes and out-of-network claim forms find the location of the nearest network pharmacy The Member Services number is 800.685.8869. Vision Service Plan (CIGNA Open Access and CIGNA POS)-The Member Services number is 800.877.7195. MetLife Dental Plan-The Member Services number is 800.942.0854. Note: See Dental section of the Book of Benefits for additional information. Delta Dental Plan-The Member Services number is 800.223.3104. Note: See Dental section of the Book of Benefits for additional

368

DOE CONTRACTOR PENSION PLANS  

Broader source: Energy.gov (indexed) [DOE]

1-13 1-13 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental remediation, infrastructure services and other site-specific project completion contracts. DOE-H-1002 EMPLOYEE COMPENSATION: PAY AND BENEFITS (a) Contractor Employee Compensation Plan The Contractor shall submit, for Contracting Officer approval, by (fill-in

369

Biomedical Engineering Program Assessment Plan Biomedical Engineering Program Assessment Plan  

E-Print Network [OSTI]

1 Biomedical Engineering Program Assessment Plan Biomedical Engineering Program in science and mathematics to address engineering problems in a biomedical context. a. Demonstrate a working sciences. b. Demonstrate ability to apply basic science concepts as foundations to biomedical engineering

Cantlon, Jessica F.

370

What Is the Plan Commission  

E-Print Network [OSTI]

What Is the Plan Commission & How Does It Work? Purdue University Cooperative Extension Service valuable to the community and to its elected and appointed officials. Plans and proposals from individuals- nance, and a subdivision ordinance. They also make recommendations to elected officials on proposed

371

Business Plan Development Company Description  

E-Print Network [OSTI]

by the establishment of additional work stations. Raw materials purchasing and subsequent manufacturing need to be done purchasing and manufacturing under my personal name to-date. The concept of the device I patented market, marketing plan, web development, manufacturing plan to allow for maximum profit margin while

Dahl, David B.

372

E-Print Network 3.0 - age employment status Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in O-1 status is authorized only to work for the employer who... years of age) of aliens in O-1 Status are eligible ... Source: Chinnam, Ratna Babu - Department of Industrial...

373

Planning for Cities  

Science Journals Connector (OSTI)

... of the techniques-or the disciplines -which should by now inform the work even of pedestrian city planners. The fact that the planning study which has been carried out for ... s ahurch is an obvious need. Some skill has been spent on devices for separating pedestrians and wheeled traffic, chiefly by erecting ...

1968-11-23T23:59:59.000Z

374

Proposed Work Scope for the Rail Topic Group  

Broader source: Energy.gov (indexed) [DOE]

Proposed Task Plan for TEC Rail Topic Group Status: Active DOE Leads: Office of Civilian Radioactive Waste Management (OCRWM), Office of National Transportation, Jay Jones and Alex Thrower Start Date: September 22, 2005 Purpose: The purpose of the Transportation External Coordinating (TEC) Working Group's Rail Topic Group (RTG) is to provide stakeholder perspectives and feedback to the Office of National Transportation (ONT) in the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) regarding topics of common interest concerning operating practices, logistical constraints, and other rail- related issues affecting the development and deployment of a safe, secure, and efficient system for transporting spent fuel (SNF) and high-level radioactive waste (HLW) to a

375

Marketing Communications Plan for SKC  

E-Print Network [OSTI]

Marketing Communications graduate students at the University of Kansas worked with SKC, a unified communications integrator, to conduct primary and secondary research to develop a strategic marketing communications plan for the organization...

Cofer, Katie; Hester, Mai; Gregory, Chris; Schaub, Jenni

2014-09-03T23:59:59.000Z

376

NIST 3-Year Programmatic Plan  

E-Print Network [OSTI]

areas critical to the nation's economy.The America COMPETES Act outlines major roles for NIST-year period.NIST will continue to refine this plan as it works with the Administration to address national

377

Criteria for an effective water resource planning process  

E-Print Network [OSTI]

In examining the present status of water resource planning in the Pacific Northwest, numerous critical inadequacies become readily apparent. One method of minimizing some of these inadequacies is through administrative ...

Bowers, James Myron

1961-01-01T23:59:59.000Z

378

2010 Annual Planning Summary for National Energy Technology Laboratory (NETL)  

Broader source: Energy.gov [DOE]

Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

379

2010 Annual Planning Summary for Idaho Operations Office (ID)  

Broader source: Energy.gov [DOE]

Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

380

2010 Annual Planning Summary Livermore Site Office (LSO)  

Broader source: Energy.gov [DOE]

Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

2010 Annual Planning Summary for Civilian Radioactive Waste Management (CRWM)  

Broader source: Energy.gov [DOE]

Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

382

2010 Annual Planning Summary for Nevada Site Office  

Broader source: Energy.gov [DOE]

Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

383

2010 Annual Planning Summary for Intelligence and Counterintelligence (IN)  

Broader source: Energy.gov [DOE]

Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

384

2011 Annual Planning Summary for Argonne Site Office (Argonne)  

Broader source: Energy.gov [DOE]

Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

385

2010 Annual Planning Summary for Defense Nuclear Nonproliferation (NA-20)  

Broader source: Energy.gov [DOE]

Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

386

Environmental Implementation Plan  

SciTech Connect (OSTI)

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

Not Available

1994-02-01T23:59:59.000Z

387

ORISE: Operations Support and Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Securing the Golden State Amber Waves 2012 Bureau of Reclamation Emergency Management Issues Special Interest Group Golden Guardian Joint Information Center Preventing Nuclear Smuggling Program Training and Technology Support Resources How to Work With Us Contact Us Oak Ridge Institute for Science Education Operations Support and Planning Operations Support and Planning The Oak Ridge Institute for Science and Education (ORISE) provides operations and planning support to the U.S. Department of Energy (DOE), Federal Emergency Management Agency and other government agencies for their counterterrorism and emergency response readiness programs. ORISE's planning, logistical and administrative support areas are focused on enhancing the radiological preparedness and response coordination

388

US/FRG umbrella agreement for cooperation in GCR development. Fuel, fission products, and graphite subprogram. Quarterly status report, January 1, 1983-March 31, 1983  

SciTech Connect (OSTI)

This report describes the status of the cooperative work being performed in the Fuel, Fission Product, and Graphite Subprogram under the HTR-Implementing Agreement of the United States/Federal Republic of Germany Umbrella Agreement for Cooperation in GCR Development. The status is described relative to the commitments in the Subprogram Plan for Fuel, Fission Products, and Graphite, Revision 5, April 1982, and Revision 6, February 1983. The work described was performed during the period January 1 through March 31, 1983 in the HTGR Base Technology Program at Oak Ridge National Laboratory, the HTGR Fuel and Plant Technology Programs at GA Technologies Inc. (GA), and the Project HTR-Brennstoffkreislauf of the Entwicklungsgemeinschaft HTR at KFA Juelich, HRB Mannheim, INTERATOM Bensberg, HOBEG Hanau, and SIGRI Meitingen.

Turner, R.F.

1983-04-01T23:59:59.000Z

389

US/FRG umbrella agreement for cooperation in GCR development. Fuel, fission products, and graphite subprogram. Quarterly status report, July 1, 1981-September 30, 1981  

SciTech Connect (OSTI)

This report describes the status of the cooperative work being performed in the Fuel, Fission Product, and Graphite Subprogram under the HTR-Implementing Agreement of the United States/Federal Republic of Germany Umbrella Agreement for Cooperation in GCR Development. The status is described relative to the commitments in the Subprogram Plan for Fuel, Fission Products, and Graphite, Revision 3, April 1981. The work described was performed during the period July 1, 1981 through September 30, 1981 in the HTGR Base Technology Program at Oak Ridge National Laboratory, the HTGR Fuel and Plant Technology Programs at General Atomic Company, and the Project HTR-Brennstoffkreislauf of the Entwicklungsgemeinschaft HTR at KFA Julich, HRB Mannheim, HOBEG Hanau and SIGRI Meitingen.

Turner, R.F.

1981-10-01T23:59:59.000Z

390

Foreign Obligations Implementation Status Presentation  

National Nuclear Security Administration (NNSA)

January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, Georgia Georgia Obligations Accounting Implementation Workshop Obligations Accounting Implementation Workshop Foreign Obligations Implementation Status Brian G. Horn U.S. Nuclear Regulatory Commission January 13, 2004 Obligations Accounting Implementation Workshop January 13, 2 Obligations Accounting Implementation Workshop January 13, 2004 Crowne Plaza Ravinia Atlanta, GA 004 Crowne Plaza Ravinia Atlanta, GA Overview of Meeting Overview of Meeting * Review how the Obligation Tracking System is working * Presentations: - Review of Government notification procedures - Establishment of the beginning Obligation Balances for sites

391

River Protection Project (RPP) Environmental Program Plan  

SciTech Connect (OSTI)

This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

POWELL, P.A.

2000-03-29T23:59:59.000Z

392

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

End Point Closeout Examples Example 77 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field representative will verify acceptable completion of the applicable activity. Verification may be performed by reviewing documents, letters, photos, work packages, or work plans, or by visual inspection. When all the endpoints for a specific area of the building have been completed and verified, designated BWHC and BHI management will sign for completion and acceptance of that

393

BCDA Machine Status Link  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Machine Status Link Machine Status Link Version 1.33 (December 2005) David M. Kline. The Machine Status Link (MSL) is responsible for distributing the digitized beam current, injection status, P0 clock, and other statuses over a single fiber to several locations around the Storage Ring. The MRD100 is a VME-based module that is part of the MSL and was specifically designed for the APS. It receives and interprets information from the XMS100 module by means of copper or fiber. Signals from the XMS100 module are sent at a P0 rate (3.667 microseconds). It sends two registers every cycle and all in about 12 cycles. Refer to the ASD website for additional information regarding the MSL. The focus of this page is to provide information of how to configure the MRD100 for a beamline IOC and to discuss the sample IOC

394

Nuclear proliferation status report. Status report  

SciTech Connect (OSTI)

This report contains information concerning the nuclear proliferation status of the following countries: (1) Russia, (2) Ukraine, (3) Belarus, (4) Kazakhstan, (5) Israel, (6) India, (7) Pakistan, (8) South Africa, (9) North Korea, (10) Iraq, (11) Iran, (12) Lybia, (13) Algeria, (14) Syria, (15) Brazil, (16) Argentina, and (17) Taiwan.

NONE

1992-07-01T23:59:59.000Z

395

Plutonium Vulnerability Management Plan  

SciTech Connect (OSTI)

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

396

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Broader source: Energy.gov (indexed) [DOE]

System Closure Plan Examples System Closure Plan Examples Example 61 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field representative will verify acceptable completion of the applicable activity. Verification may be performed by reviewing documents, letters, photos, work packages, or work plans, or by visual inspection. When all the endpoints for a specific area of the building have been completed and verified, designated BWHC and BHI management will sign for completion and acceptance of that

397

AGRICULTURE, 2008 Status of the Wisconsin Farm Economy  

E-Print Network [OSTI]

STATUS OF WISCONSIN AGRICULTURE, 2008 Status of the Wisconsin Farm Economy Situation and Outlook of Working Lands in Wisconsin · Hired Labor on Wisconsin Dairy Farms Department of Agricultural and Applied Economics College of Agricultural and Life Sciences University of Wisconsin-Madison Cooperative Extension

Radeloff, Volker C.

398

Economic Consequences of Health Status: A Review of the Evidence  

E-Print Network [OSTI]

Economic Consequences of Health Status: A Review of the Evidence Amar A. Hamoudi and Jeffrey D Papers #12;CID Working Paper no. 30 Economic Consequences of Health Status: A Review of the Evidence Amar A. Hamoudi and Jeffrey D. Sachs Abstract The correlation between health and economic performance

399

Between a rock and a hard plan  

Science Journals Connector (OSTI)

......company policy changes, or regulatory and environmental changes...management failure. review work to date and have...You agree the top level plans and budget and once the...management books always say plan your business case...teams; managing project plans; and managing yourself......

Suzanna Marsh

2007-01-01T23:59:59.000Z

400

Current status of Japanese detectors  

E-Print Network [OSTI]

Current status of TAMA and CLIO detectors in Japan is reported in this article. These two interferometric gravitational-wave detectors are being developed for the large cryogenic gravitational wave telescope (LCGT) which is a future plan for detecting gravitational wave signals at least once per year. TAMA300 is being upgraded to improve the sensitivity in low frequency region after the last observation experiment in 2004. To reduce the seismic noises, we are installing new seismic isolation system, which is called TAMA Seismic Attenuation System, for the four test masses. We confirmed stable mass locks of a cavity and improvements of length and angular fluctuations by using two SASs. We are currently optimizing the performance of the third and fourth SASs. We continue TAMA300 operation and R&D studies for LCGT. Next data taking in the summer of 2007 is planned. CLIO is a 100-m baseline length prototype detector for LCGT to investigate interferometer performance in cryogenic condition. The key features of CLIO are that it locates Kamioka underground site for low seismic noise level, and adopts cryogenic Sapphire mirrors for low thermal noise level. The first operation of the cryogenic interferometer was successfully demonstrated in February of 2006. Current sensitivity at room temperature is close to the target sensitivity within a factor of 4. Several observation experiments at room temperature have been done. Once the displacement noise reaches at thermal noise level of room temperature, its improvement by cooling test mass mirrors should be demonstrated.

Daisuke Tatsumi; Ryutaro Takahashi; Koji Arai; Noriyasu Nakagawa; Kazuhiro Agatsuma; Toshitaka Yamazaki; Mitsuhiro Fukushima; Masa-Katsu Fujimoto; Akiteru Takamori; Alessandro Bertolini; Virginio Sannibale; Riccardo DeSalvo; Szabolcs Marka; Masaki Ando; Kimio Tsubono; Tomomi Akutsu; Kazuhiro Yamamoto; Hideki Ishitsuka; Takashi Uchiyama; Shinji Miyoki; Masatake Ohashi; Kazuaki Kuroda; Norichika Awaya; Nobuyuki Kanda; Akito Araya; Souichi Telada; Takayuki Tomaru; Tomiyoshi Haruyama; Akira Yamamoto; Nobuaki Sato; Toshitaka Suzuki; Takakazu Shintomi

2007-04-22T23:59:59.000Z

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Regional Transmission Planning Webinar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

402

Fuel Cell Technology Status - Voltage Degradation (Presentation)  

SciTech Connect (OSTI)

This presentation describes an independent assessment of fuel cell durability status and discusses the project's relevance to the Department of Energy Hydrogen and Fuel Cells Program; NREL's analysis approach; the FY12 technical accomplishments including the fourth annual publication of results; and project collaborations and future work.

Kurtz, J.; Wipke,; Sprik, S.; Saur, G.

2012-06-01T23:59:59.000Z

403

EBT-P project status report  

SciTech Connect (OSTI)

This Elmo Bumpy Torus Report describes the status of the EBT-P Project in September 1983 after phasedown of the Title II design effort. The report is intended to be a principle source of guidance in the event of a decision to resume work on the project.

Not Available

1983-11-01T23:59:59.000Z

404

Going To Work: Work Relationships  

E-Print Network [OSTI]

One of a worker's top goals should be to develop good relationships with coworkers and supervisers. This publication discusses five general rules for building good relationships at work and offers advice on handling criticism....

Hoffman, Rosemarie

2000-07-20T23:59:59.000Z

405

Yucca Mountain - The Department of Energy's Status Report on Its Archiving  

Broader source: Energy.gov (indexed) [DOE]

The Department of Energy's Status Report on Its The Department of Energy's Status Report on Its Archiving Plan Yucca Mountain - The Department of Energy's Status Report on Its Archiving Plan Proceeding before the Nuclear Regulatory Commission on DOE's application for a license to construct a high-level waste repository at Yucca Mountain, Nevada; DOE provides answers to the questions of the Atomic Safety and Licensing Board regarding its plans to archive its document collection on the Licensing Support Network. Yucca Mountain - The Department of Energy's Status Report on Its Archiving Plan More Documents & Publications U.S. Department of Energy's Response to Petitions to Intervene Yucca Mountain - U.S. Department of Energy's Reply to the Responses to the Motion to Withdraw Yucca Mountain - U.S. Department of Energy's Brief in Support of Review and

406

CORPORATE AND STRATEGIC PLANNING Faculty planning workbook  

E-Print Network [OSTI]

.............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 ­ 2012/13 #12

407

Proactive Planning  

E-Print Network [OSTI]

, rainwater harvesting, stream bank stabilization, and educational programs to prevent urban and agricultural nonpoint source pollution. Project leaders plan to have the Cedar Creek Watershed Protection Plan finalized by the summer of 2008. ?We... on watershed management, stream restoration practices, agricultural best man- agement practices, rainwater harvesting, non- point source pollution control, on-site septic system maintenance, and other water quality issues facing urban and rural...

Wythe, Kathy

2008-01-01T23:59:59.000Z

408

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

Baselines - Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP) for WBS 1.4 (FDH 1998). These cost and schedule details will provide the basis for a baseline change request that will be processed to revise the MYWP, consistent with the accelerated project plan presented below. 6.1 Project Baseline Overview This section of the IPMP presents the PFP baseline cost and schedule summary. The currently approved PFP Stabilization and

409

Customer Service Plan  

Broader source: Energy.gov (indexed) [DOE]

Customer Service Plan Department of Energy Customer Service Plan - 2011 1 A Message from the Secretary Over the past two and a half years, the Obama Administration and the Department of Energy have worked to make the federal government more open for the American public and its own employees. Through these efforts, we have significantly expanded the amount and breadth of information available online about our programs and services. We have also transformed the way we communicate with the public by relaunching Energy.gov, making it an interactive, streamlined information platform. In April, President Obama directed federal agencies to take this ongoing effort one step further and establish Customer Service Plans, improving the public's interactions with the

410

DAF Glovebox Project Plan  

SciTech Connect (OSTI)

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

411

Energy Organizational Planning  

SciTech Connect (OSTI)

As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

Gina C. Paradis; James Yockey; Tracey LeBeau

2009-04-17T23:59:59.000Z

412

REGULATORY STATUS: AOC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

184 UNIT NAME: Concrete Rubble pile 129) REGULATORY STATUS: AOC LOCATION: Outside plant security south of C-611 Water Treatment Plant. Estimated to be less than 5 cubic feet....

413

Status of Solar Photovoltaics  

Science Journals Connector (OSTI)

Before our discussions on the technical aspects of solar photovoltaics, we will first review the status of solar photovoltaics. This chapter begins with a review on ... known barrier to large-scale deployment of ...

Meng Tao

2014-01-01T23:59:59.000Z

414

UCPath Project Status Report Report Date September 7, 2012 Project Director  

E-Print Network [OSTI]

this transition. Project Status Project Management Start Date Finish Date Status Decisions, Issues and Risks 1 areas have been completed. The Management Workgroup has agreed to begin preliminary planning to convert the case management/knowledge management tool. The UCPath PMO has completed initial mapping of entry

Talley, Lynne D.

415

Lower Columbia Salmon Recovery Fish & Wildlife Subbasin Plan  

E-Print Network [OSTI]

Lower Columbia Salmon Recovery And Fish & Wildlife Subbasin Plan Volume II ­ Subbasin Plan Chapter II.I. Washougal Subbasin II.J. Wind Subbasin II.K. Little White Salmon Subbasin II.L. Columbia Gorge, status, and limiting factors of other fish and wildlife species of interest to recovery and subbasin

416

Lower Columbia Salmon Recovery Fish & Wildlife Subbasin Plan  

E-Print Network [OSTI]

Lower Columbia Salmon Recovery And Fish & Wildlife Subbasin Plan Volume II ­ Subbasin Plan Chapter Tributaries II.I. Washougal Subbasin II.J. Wind Subbasin II.K. Little White Salmon Subbasin II.L. Columbia Descriptions, status, and limiting factors of other fish and wildlife species of interest to recovery

417

Working Copy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 Effective Date: 11/05/13 WP 12-IS.01-6 Revision 10 Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls Cognizant Section: Industrial Safety/Industrial Hygiene Approved By: Tom Ferguson Working Copy Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls WP 12-IS.01-6, Rev. 10 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 7 ACRONYMS AND ABBREVIATIONS ............................................................................. 8 1.0 INTRODUCTION 1 ............................................................................................... 10 2.0 VISITORS ........................................................................................................... 11

418

RTG_Task Plan 12-18-07  

Broader source: Energy.gov (indexed) [DOE]

for Review and Comment Only for Review and Comment Only 1 of 5 TEC Routing Topic Group Task Plan (as of 12/18/07) Status: Active DOE Leads: Office of Civilian Radioactive Waste Management (OCRWM), Office of Logistics Management, Alex Thrower (202) 586-7905 Start Date: October 20, 2006 Purpose: The Transportation External Coordinating (TEC) Working Group's Routing Topic Group (RTG) will examine topics of interest and relevance concerning routing of shipments of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) to a national repository at Yucca Mountain, Nevada. The purpose of the RTG is to provide stakeholders with a forum to provide their perspectives to the Office of Logistics Management (OLM) in the Department of Energy's (DOE's) Office of Civilian

419

ARM Science Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ER-ARM-0402 ER-ARM-0402 Atmospheric Radiation Measurement Program Science Plan Current Status and Future Directions of the ARM Science Program Thomas P. Ackerman, Lead Author Anthony D. Del Genio Gregory M. McFarquhar Robert G. Ellingson Peter J. Lamb Richard A. Ferrare Charles N. Long Steve A. Klein Johannes Verlinde October 2004 United States Department of Energy Office of Science, Office of Biological and Environmental Research Executive Summary The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative

420

Working Group Report: Sensors  

SciTech Connect (OSTI)

Sensors play a key role in detecting both charged particles and photons for all three frontiers in Particle Physics. The signals from an individual sensor that can be used include ionization deposited, phonons created, or light emitted from excitations of the material. The individual sensors are then typically arrayed for detection of individual particles or groups of particles. Mounting of new, ever higher performance experiments, often depend on advances in sensors in a range of performance characteristics. These performance metrics can include position resolution for passing particles, time resolution on particles impacting the sensor, and overall rate capabilities. In addition the feasible detector area and cost frequently provides a limit to what can be built and therefore is often another area where improvements are important. Finally, radiation tolerance is becoming a requirement in a broad array of devices. We present a status report on a broad category of sensors, including challenges for the future and work in progress to solve those challenges.

Artuso, M.; et al.,

2013-10-18T23:59:59.000Z

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Status of the EPIC Codes, Material Characterization and New Computing Concepts at Honeywell  

Science Journals Connector (OSTI)

This paper presents the status of various aspects of computational penetration mechanics at Honeywell. The discussion includes references to previous work...

Gordon R. Johnson

1983-01-01T23:59:59.000Z

422

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Broader source: Energy.gov (indexed) [DOE]

H&S Plan Examples H&S Plan Examples Example 46 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity  Hazard control integrated into work processes

423

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

Chapter 7.1 (May 2012 second revision) Chapter 7.1 (May 2012 second revision) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

424

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

-Chapter 7.1 (May 2012) -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

425

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

January 2011) January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

426

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

OCTOBER 2010) OCTOBER 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

427

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

PLANNING PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 6 Competition Requirements 4. FAR Part 7 Acquisition Planning 5. FAR Part 8 Required Sources of Supply 6. FAR Part 9 Contractor Qualifications 7. FAR Part 10 Market Research 8. FAR Part 11 Describing Agency Needs 9. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 10. FAR Subpart 16.1 Selecting Contract Types 11. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 12. FAR 17 Special Contracting Methods 13. FAR Part 19 Small Business Programs 14. FAR 25.802(a)(2) Other International Agreements and Coordination 15. FAR 34.004 Acquisition Strategy

428

Streamlined Approach for Environmental Restoration Work Plan for Corrective Action Unit 461: Joint Test Assembly Sites and Corrective Action Unit 495: Unconfirmed Joint Test Assembly Sites Tonopah Test Range, Nevada  

SciTech Connect (OSTI)

This Streamlined Approach for Environmental Restoration plan addresses the action necessary for the clean closure of Corrective Action Unit 461 (Test Area Joint Test Assembly Sites) and Corrective Action Unit 495 (Unconfirmed Joint Test Assembly Sites). The Corrective Action Units are located at the Tonopah Test Range in south central Nevada. Closure for these sites will be completed by excavating and evaluating the condition of each artillery round (if found); detonating the rounds (if necessary); excavating the impacted soil and debris; collecting verification samples; backfilling the excavations; disposing of the impacted soil and debris at an approved low-level waste repository at the Nevada Test Site

Jeff Smith

1998-08-01T23:59:59.000Z

429

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Broader source: Energy.gov (indexed) [DOE]

Technical Baseline Development and Control Technical Baseline Development and Control Examples Example 40 5.0 PROJECT MANAGEMENT AND CONTROL The Project Management and Control section provides an overview of the project management and control systems that will be used to manage the 324/327 Buildings Stabilization/Deactivation Project, addressing the following key elements of project management and control:  Project Management Control System (PMCS) - Work breakdown structure - Baseline development/update - Scheduling - Performance measurement and reporting - Change control  Information and reporting - Project status report - Project manager's monthly report - FDH/RL project status review - DOE-HQ project management reviews - Special reviews

430

Fuel Cell Technologies Office: Catalysis Working Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Catalysis Working Catalysis Working Group to someone by E-mail Share Fuel Cell Technologies Office: Catalysis Working Group on Facebook Tweet about Fuel Cell Technologies Office: Catalysis Working Group on Twitter Bookmark Fuel Cell Technologies Office: Catalysis Working Group on Google Bookmark Fuel Cell Technologies Office: Catalysis Working Group on Delicious Rank Fuel Cell Technologies Office: Catalysis Working Group on Digg Find More places to share Fuel Cell Technologies Office: Catalysis Working Group on AddThis.com... Key Activities Plans, Implementation, & Results Accomplishments Organization Chart & Contacts Quick Links Hydrogen Production Hydrogen Delivery Hydrogen Storage Fuel Cells Technology Validation Manufacturing Codes & Standards Education Systems Analysis

431

Public Involvment Plan - Rifle, Colorado  

Office of Legacy Management (LM)

4-TAR 4-TAR MAC-GWRIF 7.1 UMTRA Ground Water Project Public Involvement Plan for the Environmental Assessment of Ground Water Compliance at the New and Old Rifle, Colorado, Uranium Mill Tailings Sites May 1999 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work performed under DOE Contract No. DE-AC13-96GJ87335 Public Involvement Plan for the Rifle UMTRA Sites Page 2 Introduction This Public Involvement Plan is tiered to the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project Public Participation Plan dated October 1997. This Public Involvement Plan applies to both the Old and New Rifle, Colorado, UMTRA Project sites and details the activities that have been or will be carried out to meet the public participation requirements of the

432

Technology Section of the White Paper on the Status and Future of Ground-based TeV Gamma-ray Astronomy  

E-Print Network [OSTI]

This is a report on the findings of the technology working group for the white paper on the status and future of TeV gamma-ray astronomy. The white paper is an APS commissioned document, and the overall version has also been released and can be found on astro-ph. This detailed section of the white paper discusses different technology opportunities and the technical feasibility for substantially improving IACTS and ground based particle detectors to achieve an order of magnitude better sensitivity than the instruments employed today as well as their planned upgrades. A technology roadmap for improving IACTS and ground based particle detectors is presented.

K. Byrum; J. Buckley; S. Bugayov; B. Dingus; S. Fegan; S. Funk; E. Hays; J. Holder; D. Horan; A. Konopelko; H. Krawczynski; F. Krennrich; S. Lebohec; G. Sinnis; A. Smith; V. Vassiliev; S. Wakely

2008-10-24T23:59:59.000Z

433

Web Service Composition as a Planning Task: Experiments using Knowledge-Based Planning  

E-Print Network [OSTI]

), in this paper, we present some empirical evidence to validate the effectiveness of us- ing knowledge-based planning techniques for solving WSC problems. In our experiments we utilize the PKS (Planning users to register/login prior to browsing resources. Some work has addressed the problem of planning un

Lespérance, Yves

434

September 13, 2012, HSS Focus Group Training Working Group (TWG) Meeting - Agenda  

Broader source: Energy.gov (indexed) [DOE]

3 08/29/12 3 08/29/12 HSS Focus Group Training Working Group (TWG) Meeting September 13, 2012 Room 67 HAMMER 2:00 PM - 4:30 PM Time Topic Lead 2:00 p.m.  Safety Minute  Welcome and Introductions  Review of planned agenda Chairs - Pete Stafford, Julie Johnston, Karen Boardman 2:20 PM Approval of July Meeting minutes Julie Johnston 2:25 PM Report on Status of Initiatives * Rad-Worker Reciprocity Process Evan Dunne * Next Course for Pilot - Hazwoper Ted Outwater * Idaho Training Committee Evan Dunne * Work with BMAC Evan Dunne * HAZCOM GHS Gap Training Ted Giltz * GERT Training Ted Giltz 3:10 PM Safety Culture Discussion Karen Boardman, Ted Giltz 3:20 PM Actions from last meeting update * Draft letter endorsing reciprocity effort Pete Turcic

435

E-Print Network 3.0 - adaptive planning target Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

during planning and demonstrated dynamic strategy adaptation. The currently... Working Document: Revisions as of October 9, 1998 Summary of Multiagent Planning Architecture...

436

FACT SHEET: BIOENERGY WORKING GROUP  

Broader source: Energy.gov (indexed) [DOE]

, 2010 , 2010 1 FACT SHEET: BIOENERGY WORKING GROUP At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers launched a Bioenergy Working Group, which will advance the deployment of bioenergy technologies by implementing recommendations of the Technology Action Plan on Bioenergy Technologies that was released by the Major Economies Forum Global Partnership in December 2009. The Working Group will work in close cooperation with the Global Bioenergy Partnership (GBEP), which is co-chaired by Brazil and Italy. Initial key activities of the Working Group include: 1. Global Bioenergy Atlas: The Working Group will combine and build upon existing databases of sustainably-developed bioenergy potential around the globe and make it available in an open web-

437

Surveillance Guides - Work Control Process  

Broader source: Energy.gov (indexed) [DOE]

Work Control Process Work Control Process 1.0 Objective The objective of this surveillance guide is to provide lines of inquiry for evaluating the effectiveness of the contractor's work control process. Users should be cognizant that the lines of inquiry need to be further tailored to fit specific facilities or activities in accordance with contractual mechanisms such as Maintenance Implementation Plans, Conduct of Operations Implementation Plans, and the Integrated Safety Management System Description. 2.0 References 2.1 DOE 4330.4B Maintenance Management Program 2.2 48 CFR 1970.5204-2 Department of Energy Acquisition Regulations 2.3 DOE O 5480.19, Conduct of Operations 2.4 10 CFR 830.120, Quality Assurance 3.0 Requirements Implemented This surveillance is conducted to verify implementation of Core

438

DOE Emergency Public Affairs Plan  

Broader source: Energy.gov (indexed) [DOE]

Headquarters Headquarters Office of Public Affairs Emergency Public Affairs Plan The DOE HQ Office of Public Affairs Emergency Public Affairs Plan has been approved for implementation by: __________________________________________________________ Dan Leistikow, Director, HQ Office of Public Affairs Date: ______________ __________________________________________________________ Joseph Krol, Director, HQ Office of Emergency Management Date: ______________ DOE Office of Public Affairs Emergency Public Affairs Plan 1 Purpose The Department of Energy (DOE) HQ Office of Public Affairs (PA) is committed to communicating information about the Department's work in a timely, accurate and accessible way to the news media, general public and employees.

439

May 15, 2012, Federal Technical Capability Program Face to Face Meeting … FTCP FY 2012 Operational Plan Goal 2 Accomplishments  

Broader source: Energy.gov (indexed) [DOE]

2 2 Enhance Training Champion: TJ Jackson, EM Consolidated Business Center Objective 1: Human Factors Engineering Training Development Champion: Carol Ingram Accomplishments/Status 1) Design training to support the approved HFE competencies. Date: March 31, 2012 - Complete analysis for target audiences - DONE - Compile training materials - DONE / ongoing - Refine learning objectives - DONE 2) Develop and implement training. Date: September 30, 2012 - Determine and implement appropriate training methods: The team is working with the NTC to develop blended learning for senior technical managers - Develop and finalize lesson plans, materials, etc.: in beginning stages - Provide training: timing depends on availability of resources, may be moved to FY13

440

Tax-Advantaged Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plans Tax-Advantaged Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact...

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Authorize_Changes_Contractor_Work_Force_Restructuring_Policy...  

Office of Environmental Management (EM)

rizeChangesContractorWorkForceRestructuringPolicy.pdf More Documents & Publications Workforce Restructuring Policy Draft Policy and Planning Guidance for Community Transition...

442

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

Identification and Management of Standards Identification and Management of Standards and Requirements Examples Example 22 8.1 STANDARDS / REQUIREMENT IDENTIFICATION DOCUMENT Current Status Present 9206 operations are governed by the Y-12 Site Standards/Requirement Identification Document (S/RID), Y-12 Site-level Standards/Requirements Identification Document. (NOTE: The engineering design and construction work is governed by a set of Work Smart Standards, whose maintenance is handled in a similar manner as the Y-12 S/RIDs.) The Y-12 S/RID lists the necessary and sufficient set of ES&H standards and requirements to be implemented at the Y-12 Site. The Y-12 S/RID is a living document. The Standards Management Information System (SMIS) contains the official set of S/RIDs. Deactivation Strategy

443

The Chernobyl NPP decommissioning: Current status and alternatives  

SciTech Connect (OSTI)

After the Chernobyl accident of April 26, 1986, many contradictory decisions were taken concerning the Chernobyl nuclear power plant (NPP) future. The principal source of contradictions was a deadline for a final shutdown of the Chernobyl NPP units. Alterations in a political and socioeconomic environment resulted in the latest decision of the Ukrainian Authorities about 2000 as a deadline for a beginning of the Chernobyl NPP decommissioning. The date seems a sound compromise among the parties concerned. However, in order to meet the data a lot of work should be done. First of all, a decommissioning strategy has to be established. The problem is complicated due to both site-specific aspects and an absence of proven solutions for the RBMK-type reactor decommissioning. In the paper the problem of decommissioning option selection is considered taking into account an influence of the following factors: relevant legislative and regulatory requirements; resources required to carry out decommissioning (man-power, equipment, technologies, waste management infrastructure, etc.); radiological and physical status of the plant, including structural integrity and predictable age and weather effects; impact of planned activities at the destroyed unit 4 and within the 30-km exclusion zone of the Chernobyl NPP; planed use of the site; socio-economic considerations.

Mikolaitchouk, H. [Atomaudit Ltd., Kiev (Ukraine); Steinberg, N. [Atomaudit Ltd., Kiev (Ukraine)

1996-08-01T23:59:59.000Z

444

Status of the Pit Disassembly and Conversion Facility  

SciTech Connect (OSTI)

A planned new facility, the Pit Disassembly and Conversion Facility (PDCF) will be used to disassemble the nation`s inventory of surplus nuclear weapons pits and convert the plutonium recovered from those pits into a form suitable for storage, international inspection, and final disposition. Sized to handle 35 metric tons of plutonium from pits and other sources over its 10-year operating life, the PDCF will apply the Advanced Recovery and Integrated Extraction System (ARIES) technology. ARIES process technology has been developed at Los Alamos National Laboratory (LANL) and Lawrence Livermore National Laboratory (LLNL) and an integrated system is being demonstrated LANL. Four sites were considered for locating the PDCF: Pantex Plant, Savannah River Site (SRS), Idaho National Engineering and Environmental Laboratory (INEEL), and Hanford Site. Each site offers a different opportunity for constructing the PDCF, ranging from a new building at Pantex Plant to using an existing building at Hanford Site or INEEL. The Surplus Plutonium Disposition Environmental Impact Statement was prepared by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD) to aid in site selection. This paper describes the initial scoping activities, preconceptual and conceptual design work, and the status of the PDCF.

Zygmunt, S. [Los Alamos National Lab., NM (United States); Peko, D. [Dept. of Energy, Washington, DC (United States). Office of Fissile Materials Disposition

1998-12-31T23:59:59.000Z

445

PROJECT MANGEMENT PLAN EXAMPLES Prepare and Issue Project Plan Documents  

Broader source: Energy.gov (indexed) [DOE]

and Issue Project Plan Documents and Issue Project Plan Documents Example Example 70 5.2 Information and Reporting Management reporting provides timely and accurate data to apprise BWHC, FDH, and DOE management of current and projected project conditions. Information contained in these reports is obtained from the same database that supports day-to-day management by BWHC. 5.2.1 Project Status Report Reporting for the 324/327 Buildings Stabilization/Deactivation Project is incorporated in the monthly PSR, prepared by BWHC for FDH and RL. The PSR summarizes performance and compares it with the technical, schedule, and cost baselines contained in the MYWP. The report provides the data required by the DOE-HQ process. 5.2.2 Project Manager's Monthly Report

446

Status of the WIPP Project  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been constructed to be a repository for transuranic (TRU) radioactive wastes generated from the US defense activities. In order to use WIPP as a repository for permanent disposal of TRU waste, the US Department of Energy (DOE) has to demonstrate compliance with the Standards for the Management and Disposal of Spent Nuclear Fuel, High Level and Transuranic Radioactive Wastes'' promulgated by the US Environmental Protection Agency (EPA) in the US Code of Federal Regulations 40 CFR Part 191. The DOE initially plans to perform experiments with a small quantity of waste at WIPP and would like to bring additional quantities for operational demonstration'', before determining whether WIPP is to be a repository for permanent disposal. There are serious problems in pursuing this course of action from an operational point of view. It would be wiser to take the actions necessary to decide whether the facility should be used as a permanent repository, before emplacing a substantial quantity of waste in it. This report evaluates the status of the WIPP Project as of February 1991. 22 refs.

Neill, R.H.; Chaturvedi, L.

1991-01-01T23:59:59.000Z

447

Fuel Cell Technologies Office: Photoelectrochemical Working Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About About Printable Version Share this resource Send a link to Fuel Cell Technologies Office: Photoelectrochemical Working Group to someone by E-mail Share Fuel Cell Technologies Office: Photoelectrochemical Working Group on Facebook Tweet about Fuel Cell Technologies Office: Photoelectrochemical Working Group on Twitter Bookmark Fuel Cell Technologies Office: Photoelectrochemical Working Group on Google Bookmark Fuel Cell Technologies Office: Photoelectrochemical Working Group on Delicious Rank Fuel Cell Technologies Office: Photoelectrochemical Working Group on Digg Find More places to share Fuel Cell Technologies Office: Photoelectrochemical Working Group on AddThis.com... Key Activities Plans, Implementation, & Results Accomplishments Organization Chart & Contacts

448

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

7.1 (May 2010) 7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination 13. FAR 34.004 Acquisition Strategy Guiding Principles

449

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

--Chapter 7.1 (JUNE 2010) --Chapter 7.1 (JUNE 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles

450

SCOTTISH RED SQUIRREL ACTION PLAN  

E-Print Network [OSTI]

SCOTTISH RED SQUIRREL ACTION PLAN 2006­2011 #12;#12;S C O T T I S H R E D S Q U I R R E L A C T I O.1 Background 1 1.2 Action Plan Working Group 1 1.3 Issues affecting the conservation of the red squirrel 1 1.2 Timescale and partnership working 3 2.3 Rationale 3 2.4 Key actions 4 2.4.1 Establish and monitor the red

451

Program Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

In practice, organization is fluid, highly matrixed; scientists work in multiple areas - Ad hoc Task Forces form to address specific problems or issues * Experimental Program...

452

Step 8: Implement Your Marketing Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Implement Your Marketing Plan Step 8: Implement Your Marketing Plan In this step, you will put your previous work developing messages, strategies and tactics to use to deploy...

453

Learning sustainable metropolitan development for european students of planning  

E-Print Network [OSTI]

1 Learning sustainable metropolitan development for european students of planning Serrano Jos� D, project assessment, sustainable developement, team work Introduction Metropolitan areas are experiencing ways which are more sustainable than others. In our planning training, we teach sustainable development

Paris-Sud XI, Université de

454

Underground storage tank 253-D1U1 Closure Plan  

SciTech Connect (OSTI)

This report is a closure plan for a diesel fuel tank at the Lawrence Livermore National Laboratory. Included are maps of the site, work plans, and personnel information regarding training and qualification.

Mancieri, S.; Giuntoli, N.

1993-09-01T23:59:59.000Z

455

Maps and Plans  

E-Print Network [OSTI]

shrouded door to box seats. Rose / Maps and Plans Re-Placing Places 20.1 Rose / Maps and Plans Re-Placing PlacesMaps and Plans Thomas Rose Architectural plans create the

Rose, Thomas

2008-01-01T23:59:59.000Z

456

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

Approach to Meeting Requirements Examples Approach to Meeting Requirements Examples Example 26 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity

457

Community Relations Plan Update  

Office of Legacy Management (LM)

8-TAR 8-TAR MAC-MRAP 1.9.1 Monticello Mill Tailings Superfund Site and Monticello Vicinity Properties Superfund Site Monticello, Utah Community Relations Plan Update FY 2001 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Prepared by MACTEC Environmental Restoration Services, LLC Grand Junction, Colorado Work performed under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy For more information or to request additional copies of this document, please call (800) 269-7145 (Utah only) or Monticello Repository Office Complex (435) 587-4000 DOE Grand Junction Office Community Relations Plan Update FY 2001 Page v Table of Contents Terms and Abbreviations........................................................................................................... vii

458

Automation Status | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Automation Status Automation Status Presented at the NREL Hydrogen and Fuel Cell Manufacturing R&D Workshop in Washington, DC, August 11-12, 2011. mfg2011plenarysperrick.pdf More...

459

Responsible Party: Jewel Washington Status Indicators  

E-Print Network [OSTI]

. Human Resources Division 2012 - 2013 Work Plan/Dashboard Areas of Strategic Focus Workforce and develop the relevant metrics for UNM management to make effective human resource decisions. Employment Effectiveness: Foster a culture to enhance workforce effectiveness by building partnerships, competencies

New Mexico, University of

460

Annual Training Plan Template  

Broader source: Energy.gov [DOE]

The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

Note: This page contains sample records for the topic "work plan status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Status Report and Action Plans for Countries and Territories  

E-Print Network [OSTI]

........................................................10 Ecotourism ............................................................10 Acoustic Pollution

Marsh, Helene

462

Texas Air Quality Status and the Texas Emission Reduction Plan  

E-Print Network [OSTI]

1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Millionsppb Eight-Hour Ozone Design Values and Population in Texas Population BPA CC DFW HGB ARR ELP SAN NET VIC BB LRG LAR 1997 Eight-Hour Ozone NAAQS... Ton - $5,202 Clean Air Through Energy Efficiency Conference ? Galveston, Texas ? October 10, 2012 TERP Grant Amount by Area AUS Austin Area BPA Beaumont- Port Arthur CC Corpus Christi DFW Dallas-Fort Worth ELP El Paso HGB Houston...

Hildebrand, S.

2012-01-01T23:59:59.000Z

463

Strategic Plan: Status Update 2014 Annual Faculty Conference  

E-Print Network [OSTI]

% commitment to quality, rigor and excellence Surpass $100M in research expenditures. Financially self-sustaining

464

Status and plans for Linac4 installation and commissioning  

E-Print Network [OSTI]

Linac4 is a normal conducting 160 MeV H? linear accelerator presently being installed and progressively commissioned at CERN. It will replace the ageing 50 MeV Linac2 as injector of the PS Booster (PSB), increasing at the same time its brightness by a factor of two thanks to the higher injection energy. This will be the first step of a program to increase the beam brightness in the LHC injectors for the needs of the High-Luminosity LHC project. After a series of beam measurements on a dedicated test stand the 3 MeV Linac4 front-end, including ion source, RFQ and a beam chopping line, has been recommissioned at its final position in the Linac4 tunnel. Commissioning of the following section, the Drift Tube Linac, is starting. Beam commissioning will take place in steps of increasing energy, to reach the final 160 MeV in 2015. An extended beam measurement phase including testing of stripping equipment for the PSB and a year-long test run to assess and improve Linac4 reliability will take place in 2016, prior to...

Vretenar, M; Arnaudon, L; Baudrenghien, P; Bellodi, G; Broere, J; Brunner, O; Comblin, J F; Coupard, J; Dimov, V A; Fuchs, J F; Funken, A; Gerigk, F; Granemann Souza, E; Hanke, K; Hansen, J; Yarmohammadi Satri, M; Kozsar, I; Lallement, J B; Lenardon, F; Lettry, J; Lombardi, A M; Maglioni, C; Midtun, O; Mikulec, B; Nisbet, D; Paoluzzi, M; Raich, U; Ramberger, S; Roncarolo, F; Rossi, C; Sanchez Alvarez, J L; Scrivens, R; Tan, J; Valerio-Lizarraga, C A; Vollaire, J; Wegner, R; Weisz, S; Zocca, F

2014-01-01T23:59:59.000Z

465

Nuclear Fuels Storage and Transportation Planning Project (NFST) Program Status  

Broader source: Energy.gov [DOE]

Presentation made by Jeff Williams for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

466

The CRAF/Cassini mission: Baseline plan and status  

Science Journals Connector (OSTI)

Mission spacecraft and power subsystem design considerations for the Comet Rendezvous Asteroid Flyby (CRAF)/Cassini (Saturn Orbiter) Project encompass scientific/performance and environmental/safety considerations. Based on the previous experience with the Galileo and Voyager spacecraft a CRAF/Cassini baseline design has been proposed that seeks to optimize mission performance and reliability while achieving a level of environmental safety commensurate with previous RTG?powered missions. Concurrently in support of NASAs satisfaction of National Environmental Policy Act (NEPA) requirements alternative designs capable of mitigating any significant environmental impacts associated with the baseline design are being identified. A comparison of the baseline and alternative designs will be reported in a publicly available Environmental Impact Statement (EIS) scheduled for release in draft form this Spring. The baseline design supporting these impact determinations and alternative comparisons currently rely for CRAF on a Venus?Venus?Earth gravity assist trajectory to the comet Tempel 2 and for Cassini on a Venus?Earth?Jupiter gravity assist trajectory to Saturn. The spacecraft involved in this baseline make use of a common cylindrical core design comprised of virtually identical subsystems and of a host of certain mission?specific instruments. Due to the low solar intensity at the rendezvous distances associated with both missions and the past success associated with RTG use on deep space missions three Radioisotope Thermoelectric Generators (RTGs) have been selected as the baseline power source.

Reed E. Wilcox; Dougals S. Abraham; C. Perry Bankston; Sandra M. Dawson; John W. Klein; Philip C. Knocke; Paul D. Sutton

1992-01-01T23:59:59.000Z

467

Operations Authorization Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations Authorization Assessment Plan Operations Authorization Assessment Plan Operations Authorization Assessment Plan Performance Objective: The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project. Criteria: Conditions and requirements should be established to ensure programs addressing all applicable functional areas are adequately implemented to support safe performance of the work. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work. Personnel shall be responsible and accountable for performance of work in accordance with the controls established. Operations-Authorization.doc More Documents & Publications

468

TEC Working Group Topic Groups Security Key Documents | Department...  

Broader source: Energy.gov (indexed) [DOE]

TG Work Plan August 7, 2006 Security Lessons Learned Document August 2, 2006 Security Module STG Terms and Definitions from DOE 470.4 More Documents & Publications TEC Working...

469

Wenatchee Subbasin Plan Hatchery Information for Subbasin Planning  

E-Print Network [OSTI]

modifications and reform. Some of the principal processes are: Federal: Hatchery and Genetic Management Plans hatchery reform in the Columbia Basin. Much of the initial work on the HGMP process was coordinated) The APRE process seeks to document progress toward hatchery reform in the Columbia Basin. The NPCC used

470

TASK PLAN: Tribal Issues Topic Group  

Broader source: Energy.gov (indexed) [DOE]

Task Plan 1 Tribal Issues Topic Group 7/12/00 Task Plan 1 Tribal Issues Topic Group 7/12/00 Task Plan 1 Page 1 Status: Active DOE Lead: National Transportation Program (NTP-AL; Judith Holm @ 505-845-4767) Start Date: January 1998 End Date: TBD Subject: TEC Topic Group - Tribal Issues rpose: To address issues such as: (1) HM-164 as it relates to Tribes; (2) to complete the Tribal column of the Rail Topic Group Regulatory Matrix; (3) to determine Tribal authority to stop and inspect shipments of radioactive materials; (4) to provide tribal pre-notification of DOE spent fuel shipments consistent with DOE policy and to provide continuous satellite-based tracking and monitoring capability to Tribes; (5) and to address Tribal involvement in transportation planning, training, and funding. The Topic Group

471

Transportation & Work: Exploring Car Usage and Employment Outcomes  

E-Print Network [OSTI]

Transportation & Work: Exploring Car Usage and Employment Outcomes in the LSAL Data Field Area networks. This analysis addresses the role of car usage in employment outcomes such as employment status

Bertini, Robert L.

472

Weekly Petroleum Status Report  

U.S. Energy Information Administration (EIA) Indexed Site

Petrolem Reports Petrolem Reports Weekly Petroleum Status Report Data for week ending Dec. 13, 2013 | Release Date: Dec. 18, 2013 | Next Release Date: Dec. 27, 2013 | full report Previous Issues Week: December 18, 2013 December 11, 2013 December 4, 2013 November 27, 2013 November 20, 2013 November 14, 2013 November 6, 2013 October 30, 2013 October 23, 2013 October 21, 2013 October 9, 2013 October 2, 2013 prior issues Go The petroleum supply situation in the context of historical information and selected prices. Released after 10:30 a.m. 1:00 p.m. Highlights Weekly Petroleum Status Report Highlights PDF PDF Data Overview (Combined Table 1 and Table 9) PDF Tables 1 U.S. Petroleum Balance Sheet CSV XLS PDF 2 U.S. Inputs and Production by PAD District CSV XLS PDF

473

Effects of Socioeconomic Status on Access to Invasive Cardiac Procedures and on Mortality after Acute Myocardial Infarction  

Science Journals Connector (OSTI)

Universal health care systems have been organized in most industrialized nations with a view to ensuring equitable access to medical services and improving health status for all citizens. Canada's federalprovincial Medicare plan covers all medically necessary services provided by hospitals and physicians... Universal health care systems have been organized in most industrialized nations with a view to ensuring equitable access to medical services and improving health status for all citizens. Canada's federalprovincial Medicare plan covers all medically ...

Alter D.A.Naylor C.D.Austin P.Tu J.V.

1999-10-28T23:59:59.000Z

474

Application for Research Affiliate Associate & Student Status...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Affiliate Program Application for Research Affiliate Associate & Student Status Application for Research Affiliate Associate & Student Status The following application...

475

National Hydrogen Learning Demonstration Status | Department...  

Energy Savers [EERE]

Hydrogen Learning Demonstration Status National Hydrogen Learning Demonstration Status Download presentation slides from the Fuel Cell Technologies Program webinar "National...

476

Status of JUPITER Program  

SciTech Connect (OSTI)

To obtain the data necessary for evaluating the nuclear design method of a large-scale fast breeder reactor, criticality tests with a large- scale homogeneous reactor were conducted as part of a joint research program by Japan and the U.S. Analyses of the tests are underway in both countries. The purpose of this paper is to describe the status of this project.

Inoue, T.; Shirakata, K.; Kinjo, K.; Ikegami, T.; Yamamoto, M.

1981-03-10T23:59:59.000Z

477

MARS Flight Engineering Status  

SciTech Connect (OSTI)

The Multi-sensor Airborne Radiation Survey Flight Engineering project (MARS FE) has designed a high purity germanium (HPGe) crystal array for conducting a wide range of field measurements. In addition to the HPGe detector system, a platform-specific shock and vibration isolation system and environmental housing have been designed to support demonstration activities in a maritime environment on an Unmanned Surface Vehicle (USV). This report describes the status of the equipment as of the end of FY09.

Fast, James E.; Dorow, Kevin E.; Morris, Scott J.;