Sample records for work plan recommendations

  1. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron SpinPrincetonUsingWhat is abigpresented in theWork & Life

  2. IDAHO WATER USER RECOMMENDATIONS MAINSTEM PLAN

    E-Print Network [OSTI]

    IDAHO WATER USER RECOMMENDATIONS ON THE MAINSTEM PLAN COLUMBIA RIVER BASIN FISH AND WILDLIFE PROGRAM SUBMITTED ON BEHALF OF THE COMMITTEE OF NINE AND THE IDAHO WATER USERS ASSOCIATION JUNE 15, 2001 and Flow Augmentation Policy in the Columbia River Basin #12;1 IDAHO WATER USER RECOMMENDATIONS

  3. Enhanced radiological work planning

    SciTech Connect (OSTI)

    DECKER, W.A.

    1999-05-21T23:59:59.000Z

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System.

  4. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30T23:59:59.000Z

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  5. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-10-01T23:59:59.000Z

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  6. My PhD Plan Completed Work

    E-Print Network [OSTI]

    Ruina, Andy L.

    Background My PhD Plan Completed Work Planned Work Hierarchical Biped Control A Exam Matthew Kelly August 4, 2014 Matthew Kelly Hierarchical Biped Control 1 / 34 #12;Background My PhD Plan Completed Work Planned Work Table of Contents 1 Background 2 My PhD Plan 3 Completed Work 4 Planned Work Push Hold Free

  7. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01T23:59:59.000Z

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  8. Work plan (Nov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron SpinPrincetonUsingWhat is abigpresented in theWork &ARM STM Cloud

  9. FY 1996 annual work plan

    SciTech Connect (OSTI)

    NONE

    1995-09-30T23:59:59.000Z

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  10. NM INVESTMENT OVERSIGHT COMMITTEE ERB'S PLAN DESIGN RECOMMENDATION

    E-Print Network [OSTI]

    New Mexico, University of

    Presented at December 3, 2010 Working Session Normal Retirement Eligibility Early Retirement Eligibility Retirement Eligibility Early Retirement Eligibility Final Average Compensation (FAC) Ultimate Employer Working Session (& Other Recommended Proposals) Normal Retirement Eligibility Early Retirement Eligibility

  11. 2014 Storage Plan Assessment Recommendations for the U.S. Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Storage Plan Assessment Recommendations for the U.S. Department of Energy (September 2014) 2014 Storage Plan Assessment Recommendations for the U.S. Department of Energy (September...

  12. Radiological Work Planning and Procedures

    E-Print Network [OSTI]

    Kurtz, J E

    2000-01-01T23:59:59.000Z

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

  13. Radiological Work Planning and Procedure

    SciTech Connect (OSTI)

    KURTZ, J.E.

    2000-01-01T23:59:59.000Z

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In addition, there seems to be confusion as to what should be and what should not be included in the TWD.

  14. Recommended Academic Plan for Agricultural Systems Management (ASM) University Park

    E-Print Network [OSTI]

    Omiecinski, Curtis

    Recommended Academic Plan for Agricultural Systems Management (ASM) University Park Effective requirements. GWS, GHA, GQ, GN, GA, GH, and GS are codes used to identify General Education requirements. US, IL, and US;IL are codes used to designate courses that satisfy University United States

  15. Recommended Academic Plan for Agricultural Systems Management (ASM) Commonwealth Campuses

    E-Print Network [OSTI]

    Omiecinski, Curtis

    Recommended Academic Plan for Agricultural Systems Management (ASM) Commonwealth Campuses Effective Education requirements. GWS, GHA, GQ, GN, GA, GH, and GS are codes used to identify General Education requirements. US, IL, and US;IL are codes used to designate courses that satisfy University United States

  16. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan - VOLUMES 1-3

    SciTech Connect (OSTI)

    Gerber, E.W.

    1996-09-23T23:59:59.000Z

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE's DNFSB Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. These additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document constitutes the Hanford SISMP. This document includes the planned work scope, costs and schedules for activities at the Hanford site to implement the DNFSB Recommendation 94-1 IPP.

  17. Recommendation 93-5 implementation plan, May 1996

    SciTech Connect (OSTI)

    Pennington, L.D., Westinghouse Hanford

    1996-05-01T23:59:59.000Z

    On July 19, 1993, the Defense Nuclear Facilities Safety Board transmitted Recommendation 93-5 on the Hanford Waste Tank Characterization Studies to the Department of Energy. The recommendation was accepted on September 9, 1993. Recommendation 93-5 noted that there was insufficient tank waste technical information to ensure that Hanford Site wastes could be safely stored, that associated operations could be conducted safely, and that future disposal data requirements could be met. As a result the Board recommended that the characterization effort be upgraded and expedited. The original Implementation Plan was accepted by the Board in March 1994. This Implementation Plan revision presents a modified approach to achieve the original Implementation Plan objectives. The approach concentrates on actions necessary to ensure that wastes can be safely stored, that operations can be safely conducted, and that timely characterization information for the tank waste Disposal Program can be obtained. Since Recommendation 93-5 was issued, significant progress has been achieved in understanding tank safety- related phenomena, resolving tank safety issues, and enhancing the capability and efficiency of tank characterization. Reviewing this progress led to the realization that tank safety issues could not be resolved solely by accelerating sampling and analysis to improve the characterization of tank contents. The key to expediting resolution was to better understand safety-related phenomena that cause the safety issues. A revised characterization and safety strategy evolved. The characterization and safety strategy presented in this Implementation Plan revision builds on the improved understanding and significant progress made to date. The revision is multifaceted and consists of the key elements listed: (1) Maintain tanks in an interim configuration using safety controls and, where necessary, mitigative actions. (2) Upgrade and complete the Authorization Basis for the Tank Farms. This includes producing a Basis for Interim Operation, Final Safety Analysis Report, Technical Safety Requirements, Compliance Implementation Plan, and Safety Evaluation Report. (3) Complete the ongoing programs to resolve the ferrocyanide, organic complexants, organic solvents, flammable gas, high heat, and criticality safety issues. (4) Analyze core samples from key tanks (referred to as the High Priority Tanks) to understand phenomena and resolve issues associated with groups of tanks. These tanks were selected by integrating the information needs of the Safety and Disposal Programs. Appendix F provides a summary of the High Priority Tanks identified and the basis for information requested.

  18. Draft Work Plan Environmental Assessment and Characterization

    E-Print Network [OSTI]

    Institute Site Flood Plain Area Golden, Colorado Prepared by S.M. Stoller Corporation, 2010 WORK PLAN APPROVALS Date: January 8, 2010 Radiation Safety Officer (RSO) Project

  19. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural...

    Energy Savers [EERE]

    FORMAT: Natural Gas Use in Transportation REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural Gas Use in Transportation RCC Workplan NGV.PDF More Documents &...

  20. 3 2009 OSGOC -Research Work team Report Research Work Team Recommendations

    E-Print Network [OSTI]

    Minnesota, University of

    of ensuring sufficient energy, healthy food, and clean water in the face of climate change, population growth. Recommended Goals: To advance sustainability: 1. Nurture cross-disciplinary collaboration and sharing of ideas The University of Minnesota is an international leader in interdisciplinary research and continues to work

  1. WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City, Arizona, DisposalFourthN V4100 DOE/EA-1452Di ..I WARWORK PLAN FOR

  2. B Plant Complex preclosure work plan

    SciTech Connect (OSTI)

    ADLER, J.G.

    1999-02-02T23:59:59.000Z

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

  3. Burn site groundwater interim measures work plan.

    SciTech Connect (OSTI)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01T23:59:59.000Z

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  4. Enterprise Assessments Targeted Review, Work Planning and Control...

    Energy Savers [EERE]

    Assessments Targeted Review, Work Planning and Control at the Hanford Tank Farms - April 2015 Enterprise Assessments Targeted Review, Work Planning and Control at the Hanford Tank...

  5. Integration of Safety Culture Attributes into EFCOG Work Planning...

    Energy Savers [EERE]

    Integration of Safety Culture Attributes into EFCOG Work Planning and Control Guidance Document Integration of Safety Culture Attributes into EFCOG Work Planning and Control...

  6. Memorandum, NNSA Activity Level Work Planning & Control Processes...

    Energy Savers [EERE]

    NNSA Activity Level Work Planning & Control Processes, January 2006 Memorandum, NNSA Activity Level Work Planning & Control Processes, January 2006 January 23, 2006 Memorandum from...

  7. Integrated Safety Management System as the Basis for Work Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development Integrated Safety Management System as the Basis for Work Planning and...

  8. Contractor Work Planning and Control Lessons Learned from DOE...

    Broader source: Energy.gov (indexed) [DOE]

    Work Planning and Control Lessons Learned from DOE and International Projects Contractor Work Planning and Control Lessons Learned from DOE and International Projects Addthis...

  9. Climate VISION: Private Sector Initiatives: Magnesium: Work Plans

    Office of Scientific and Technical Information (OSTI)

    Magnesium Association has developed a work plan for achieving the industry's Climate VISION commitment. Read the International Magnesium Association Work Plan (PDF 92 KB)...

  10. FY 1987 current fiscal year work plan

    SciTech Connect (OSTI)

    Not Available

    1986-12-01T23:59:59.000Z

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

  11. Staff summary of Issues and Recommendations Long Term O&M Contingency Plans

    E-Print Network [OSTI]

    1 Staff summary of Issues and Recommendations Long Term O&M Contingency Plans *Preliminary draft. Overview The majority the recommendations received by the Council regarding long term O&M/contingency plans)to ensure long-term funding of O&M (35) 3. Fish Screens and Fishways a. The habitat based Program relies

  12. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01T23:59:59.000Z

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  13. Progress Report on Power Division Work Plan

    E-Print Network [OSTI]

    RPS & impacts on PNW · Analysis of negative wholesale power prices · Wind Integration Forum · Maintain balancing" DR pilot programs · Tracking Smart Grid Demo Project ­ ­ Will include "conventional" and "load/windProgress Report on Power Division Work Plan Power Committee Meeting October 2010 1 #12;The Division

  14. Climate VISION: PrivateSector Initiatives: Mining: Work Plans

    Office of Scientific and Technical Information (OSTI)

    Work Plans The National Mining Association (NMA) will lead the industry effort to produce a work plan in collaboration with DOE and EPA. The plan will include the industry's...

  15. Climate VISION: Private Sector Initiatives: Cement: Work Plans

    Office of Scientific and Technical Information (OSTI)

    Work Plans The Portland Cement Association (PCA) has lead the industry effort to produce a Work Plan in collaboration with the EPA and DOE. The Plan includes an outline of the...

  16. Cesium legacy safety project management work plan

    SciTech Connect (OSTI)

    Durham, J.S.

    1998-04-21T23:59:59.000Z

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell).

  17. Work Plans & Manuals | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you sure you wantJoin us for|IdahotheWhat is the FOIA ? WhatWork Plans &

  18. WorkPlan: Database for Work Package Production Scheduling Proceedings IGLC '98

    E-Print Network [OSTI]

    Tommelein, Iris D.

    and expressiveness when it comes to supporting production planning and control, that is, supporting those whoWorkPlan: Database for Work Package Production Scheduling Proceedings IGLC '98 WORKPLAN: DATABASE specifically to implement lean production philosophy in construction. KEY WORDS WorkPlan, weekly work plan

  19. Operational efficiency through resource planning optimization and work process improvement

    E-Print Network [OSTI]

    Balwani, Siddharth (Siddharth Vashdev)

    2012-01-01T23:59:59.000Z

    This thesis covers work done at National Grid to improve resource planning and the execution of pipeline construction and maintenance work carried out at the yards. Resource Planning, the art of picking the right jobs for ...

  20. Methodological utilities for organizing cooperative work process according to ISO 9001 standard recommendations

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 Methodological utilities for organizing cooperative work process according to ISO 9001 standard is based on the recommendations of ISO 9001 standard. Classical methods decompose a project into several, the recommendations of the ISO 9001 standard (ISO, 2000) are applied, which define different requirements to control

  1. assessment work plan: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pushing Working Families into Poverty: Assessing the New Haven Plan to Privatize the Public Schools, Amherst March 2011 12;Pushing Working Families into Poverty: Assessing the...

  2. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  3. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    SciTech Connect (OSTI)

    Gerber, E.W.

    1995-10-01T23:59:59.000Z

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE`s Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations.

  4. Employment Information for Master of Urban Planning Graduates Working

    E-Print Network [OSTI]

    Papalambros, Panos

    and Environment, Inc. Houston, TX ESRI Redlands, CA The Futures Company New York, NY The Habitat Company Ann ArborEmployment Information for Master of Urban Planning Graduates Working in Planning Related Jobs Boulder County Land Use Planning Division Boulder, CO Chicago Metropolitan Agency for Planning Chicago, IL

  5. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan

    SciTech Connect (OSTI)

    McCormack, R.L.

    1997-05-07T23:59:59.000Z

    In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O`Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE`s baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document is the fifth update of the Hanford SISMP.

  6. Evaluation and recommendations for the Department of Energy-Farmers Home Administration small-town energy-planning grant program

    SciTech Connect (OSTI)

    Cannon, T.; Kron, N. Jr.

    1980-10-01T23:59:59.000Z

    DOE funded several small-town energy planning projects, through the Farmer's Home Administration (FmHA) Area Development Assistance Planning Grant Program. DOE intended that this program should: (1) encourage community energy planning and the development of Integrated Community Energy Systems (ICES) and (2) provide a testing ground for the technologies and planning methods developed by its Buildings and Community Systems Division. FmHA intended that the joint program should further the development of rural areas and make DOE expertise available to grant recipients doing energy planning. All grantees under this joint program endeavored to define their local energy problems and to find local solutions. However, the resulting energy cost savings were not always impressive, and generally they were not very well documented. Lack of implementation power, lack of focus, and inability to generate local financial support for projects and further planning were the main reasons for this performance. The lack of sufficient documentation could be the result of DOE's failure to require a standardized and systematic accounting of grantees' accomplishments. The recommended changes in the scope-of-work requirements suggested in this report would cause grantees to focus their energy-planning activities so as to increase local financial support. The appendixes give a standardized format by which grantees would account for the energy savings and production made possible by their planning efforts.

  7. Council Recommendation Made Simple

    E-Print Network [OSTI]

    's program BUDGETARY/ECONOMIC IMPACTS The expense planning budget associated with this project represents the recommended planning budget, must be sufficient to maintain project integrity. In recommending the work a not-to-exceed budget for the project from Fiscal Year 2010 through 2013 at $937,645, with an annual

  8. Climate VISION: Private Sector Initiatives: Aluminum: Work Plans

    Office of Scientific and Technical Information (OSTI)

    of EPA. The plan describes actions the industry intends to take to achieve its Climate VISION goal by 2010. Read the Aluminum Association Work Plan (PDF 109 KB) Download...

  9. Recommended Practice: Creating Cyber Forensics Plans for Control Systems

    SciTech Connect (OSTI)

    Eric Cornelius; Mark Fabro

    2008-08-01T23:59:59.000Z

    Cyber forensics has been in the popular mainstream for some time, and has matured into an information-technology capability that is very common among modern information security programs. The goal of cyber forensics is to support the elements of troubleshooting, monitoring, recovery, and the protection of sensitive data. Moreover, in the event of a crime being committed, cyber forensics is also the approach to collecting, analyzing, and archiving data as evidence in a court of law. Although scalable to many information technology domains, especially modern corporate architectures, cyber forensics can be challenging when being applied to non-traditional environments, which are not comprised of current information technologies or are designed with technologies that do not provide adequate data storage or audit capabilities. In addition, further complexity is introduced if the environments are designed using proprietary solutions and protocols, thus limiting the ease of which modern forensic methods can be utilized. The legacy nature and somewhat diverse or disparate component aspects of control systems environments can often prohibit the smooth translation of modern forensics analysis into the control systems domain. Compounded by a wide variety of proprietary technologies and protocols, as well as critical system technologies with no capability to store significant amounts of event information, the task of creating a ubiquitous and unified strategy for technical cyber forensics on a control systems device or computing resource is far from trivial. To date, no direction regarding cyber forensics as it relates to control systems has been produced other than what might be privately available from commercial vendors. Current materials have been designed to support event recreation (event-based), and although important, these requirements do not always satisfy the needs associated with incident response or forensics that are driven by cyber incidents. To address these issues and to accommodate for the diversity in both system and architecture types, a framework based in recommended practices to address forensics in the control systems domain is required. This framework must be fully flexible to allow for deployment into any control systems environment regardless of technologies used. Moreover, the framework and practices must provide for direction on the integration of modern network security technologies with traditionally closed systems, the result being a true defense-in-depth strategy for control systems architectures. This document takes the traditional concepts of cyber forensics and forensics engineering and provides direction regarding augmentation for control systems operational environments. The goal is to provide guidance to the reader with specifics relating to the complexity of cyber forensics for control systems, guidance to allow organizations to create a self-sustaining cyber forensics program, and guidance to support the maintenance and evolution of such programs. As the current control systems cyber security community of interest is without any specific direction on how to proceed with forensics in control systems environments, this information product is intended to be a first step.

  10. Recommended Academic Plan for the Environmental Resource Management -Soil Science Option (E R M/SOIL)

    E-Print Network [OSTI]

    Omiecinski, Curtis

    Recommended Academic Plan for the Environmental Resource Management - Soil Science Option (E R M/SOIL of Calculus I or MATH 140* (GQ) Calculus With Analytic Geometry I 4 SOILS 101 (GN) Introductory Soil Science 3 AG 150S (First-Year Seminar) Be a Master Student! 2 SOILS 102 Introductory Soil Science Laboratory 1

  11. Office of Enterprise Assessments Targeted Review of Work Planning...

    Office of Environmental Management (EM)

    Targeted Review of Work Planning and Control at the Hanford Tank Farms April 2015 Office of Worker Safety and Health Assessments Office of Environment, Safety and Health...

  12. Presentation to the EAC - Smart Grid Subcommittee Work Plan Status...

    Broader source: Energy.gov (indexed) [DOE]

    Electricity Advisory Committee Smart Grid Subcommittee Work Plan Status Joe Paladino - DOE Wanda Reder - EAC Smart Grid Sub- Committee Chair June 12, 2012 * Considerations: - Build...

  13. DOE Handbook: Implementing Activity-level Work Planning & Control...

    Office of Environmental Management (EM)

    Nuclear Facilities DOE Handbook: Implementing Activity-level Work Planning & Control at Nuclear Facilities May 16, 2013 Presenter: James Winter, NA-00-10 Topics Covered: Project...

  14. Sandia Site Office Assessment of Activity-Levell Work Planning...

    Broader source: Energy.gov (indexed) [DOE]

    of Activity-Level Work Planning and Control at Sandia National Laboratories New Mexico (SNL) Dates of Activity : 02142011 - 02182011 Report Preparer: Patricia Williams...

  15. Library Web Standards Recommendations of the SCIS Web Standards Working Group

    E-Print Network [OSTI]

    Seldin, Jonathan P.

    Library Web Standards Recommendations of the SCIS Web Standards Working Group Prepared by L. Jacobs: In support of research, teaching, and public service, the mission of the University of Lethbridge Library of the Library. Goals of Library Web Pages: To facilitate access to Library resources To supplement access

  16. FY 1999 annual work plan for infrastructure program WBS 6

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-08-27T23:59:59.000Z

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  17. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1993-06-01T23:59:59.000Z

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

  18. Important information for planning experimental work & installations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    assistance, but you must discuss this first with the ATF Director. (SA178) - Any welding within ATF must have a hot work permit issued by the FireRescue group, since...

  19. Office of Inspector General fiscal year 1996 annual work plan

    SciTech Connect (OSTI)

    NONE

    1995-10-01T23:59:59.000Z

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  20. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02T23:59:59.000Z

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  1. Proper Sustainability: GAP Grant Proposal Work Plan Strategy Webinar

    Office of Energy Efficiency and Renewable Energy (EERE)

    In this webinar I will discuss the new GAP grant requirements for tribal environmental programs and strategies for crafting a work plan that focuses on capacity building activities.  My goal is to...

  2. Work Plan FY 2015 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you sureReportsofDepartmentSeriesDepartment of Energy Wondering What AllWork

  3. Final work plan : groundwater monitoring at Centralia, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2005-08-31T23:59:59.000Z

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at the site of a former grain storage facility at Centralia, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Centralia being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Centralia.

  4. Technical Support Section annual work plan for FY 1995

    SciTech Connect (OSTI)

    Adkisson, B.P.; Hess, R.A.; Kunselman, C.W.; Millet, A.J.; Smelcer, D.R.

    1994-10-01T23:59:59.000Z

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Work performed by TSS is in support of basic and applied research and development (R and D), engineering, and instrument and computer systems managed by ORNL. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from and driven directly by current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts and the establishment of new facilities or environmental safety and health programs. The ``Long-Range Work Plan`` is based on estimates of impact of the long-range priorities and directions of the Laboratory. Identifiable proposed new facilities and programs provide additional basis for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new-hires, and identification of essential test equipment needed in new work.

  5. Audience/Panel Discussion: Sites Lesson Learned about Activity-level Work Planning and Control Using EFCOG Work Planning and Control Guideline

    Broader source: Energy.gov [DOE]

    Slide Presentation by Donna J. Governor, Deputy Dept Mgr for Planning & Integration, Lawrence Livermore National Laboratory. Lawrence Livermore National Laboratory work planning and control lessons learned and audience/panel discussion on site's lessons learned about Activity-level Work Planning and Control using EFCOG Work Planning and Control Guideline Document.

  6. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    SciTech Connect (OSTI)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-12-31T23:59:59.000Z

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites` input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves.

  7. The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

    SciTech Connect (OSTI)

    Young, Ralph [Paducah Citizens Advisory Board (United States)] [Paducah Citizens Advisory Board (United States)

    2013-07-01T23:59:59.000Z

    One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)

  8. Final work plan for targeted sampling at Webber, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2006-05-01T23:59:59.000Z

    This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

  9. Tank waste remediation system multi-year work plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  10. In-situ bioremediation drilling and characterization work plan

    SciTech Connect (OSTI)

    Koegler, K.J.

    1994-04-26T23:59:59.000Z

    This work plan describes the design and construction of proposed wells and outlines the characterization activities to be performed in support of the In Situ Bioremediation Task for FY 1994. The purpose of the well-design is to facilitate implementation and monitoring of in situ biodegradation of CCl{sub 4} in ground water. However, the wells will also be used to characterize the geology, hydrology, microbiology, and contaminant distribution, which will all feed into the design of the technology. Implementation and design of this remediation demonstration technology will be described separately in an integrated test plan.

  11. Lesson Learned by Savannah River Site Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bonnie Barnes, Savannah River Remediation. Work Planning and Control at Savannah River Remediation.

  12. Site health and safety plan/work plan for further characterization of waste drums at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Abston, J.P.; Burman, S.N.; Jones, D.L.

    1995-10-01T23:59:59.000Z

    The health and safety plan/work plan describes a strategy for characterizing the contents of 172 liquid waste and 33 solid waste drums. It also addresses the control measures that will be taken to (1) prevent or minimize any adverse impact on the environment or personnel safety and health and (2) meet standards that define acceptable management of hazardous and radioactive materials and wastes. When writing this document, the authors considered past experiences, recommendations, and best management practices to minimize possible hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or unplanned releases of hazardous or radioactive materials to air, soil, or surface water.

  13. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Not Available

    1994-07-01T23:59:59.000Z

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan.

  14. In-well vapor stripping drilling and characterization work plan

    SciTech Connect (OSTI)

    Koegler, K.J.

    1994-03-13T23:59:59.000Z

    This work plan provides the information necessary for drilling, sampling, and hydrologic testing of wells to be completed in support of a demonstration of the in-well vapor stripping system. The in-well vapor stripping system is a remediation technology designed to preferentially extract volatile organic compounds (VOCs) from contaminated groundwater by converting them to a vapor phase. Air-lift pumping is used to lift and aerate groundwater within the well. The volatiles escaping the aerated water are drawn off by a slight vacuum and treated at the surface while the water is allowed to infiltrate the vadose zone back to the watertable.

  15. 73TURTLE TAXONOMY WORKING GROUP Recommendations and Guidelines Defining Turtle Diversity: Proceedings of a Workshop on Genetics, Ethics, and Taxonomy of Freshwater Turtles and Tortoises

    E-Print Network [OSTI]

    Grether, Gregory

    73TURTLE TAXONOMY WORKING GROUP ­ Recommendations and Guidelines Defining Turtle Diversity: Proceedings of a Workshop on Genetics, Ethics, and Taxonomy of Freshwater Turtles and Tortoises H. Bradley 4:73-84 · © 2007 by Chelonian Research Foundation Turtle Taxonomy: Methodology, Recommendations

  16. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15T23:59:59.000Z

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining what future CCC/USDA actions may be necessary, with the ultimate goal of achieving classification of the Sylvan Grove site at no further action status. The proposed activities are to be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory, a nonprofit, multidisciplinary research center operated by the UChicago Argonne, LLC, for the U.S. Department of Energy. Argonne provides technical assistance to the CCC/USDA concerning environmental site characterization and remediation at former grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. That document should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Sylvan Grove.

  17. Action Plan and Status of Resolutions for LWRS Steering Committee Recommendations Dated August 13, 2009

    SciTech Connect (OSTI)

    Hongbin Zhang

    2009-08-01T23:59:59.000Z

    The resolutions to the recommendations from the Report of the Steering Committee for the LWRS Program Dated August 13, 2009 are documented.

  18. Advanced energy design and operation technologies research: Recommendations for a US Department of Energy multiyear program plan

    SciTech Connect (OSTI)

    Brambley, M.R.; Crawley, D.B.; Hostetler, D.D.; Stratton, R.C.; Addision, M.S.; Deringer, J.J.; Hall, J.D.; Selkowitz, S.E.

    1988-12-01T23:59:59.000Z

    This document describes recommendations for a multiyear plan developed for the US Department of Energy (DOE) as part of the Advanced Energy Design and Operation Technologies (AEDOT) project. The plan is an outgrowth of earlier planning activities conducted for DOE as part of design process research under the Building System Integration Program (BSIP). The proposed research will produce intelligent computer-based design and operation technologies for commercial buildings. In this document, the concept is explained, the need for these new computer-based environments is discussed, the benefits are described, and a plan for developing the AEDOT technologies is presented for the 9-year period beginning FY 1989. 45 refs., 37 figs., 9 tabs.

  19. Site observational work plan for the UMTRA Project site at Falls City, Texas

    SciTech Connect (OSTI)

    NONE

    1995-06-01T23:59:59.000Z

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

  20. Technical support section annual work plan for FY 1996

    SciTech Connect (OSTI)

    Adkissson, B.P.; Allison, K.L.; Hess, R.A.; Kunselman, C.W.; Odom, S.M.; Smelcer, D.R.

    1996-04-01T23:59:59.000Z

    The Technical Support Section (TSS) of the Instrumentation and Controls (I&C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Work performed by TSS is in support of basic and applied research and development (R&D), engineering and instrument and computer systems managed by ORNL. It is the mission of TSS to support programs and policies of ORNL, emphasizing safety and ensuring cost-effective support for R&D. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from and driven directly by current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R&D programs because of attrition or budget cuts and the establishment of new facilities or environmental safety and health programs. TSS does not have an annual budget to cover operating expenses incurred in providing instrumentation maintenance support to ORNL. Each year TSS contacts ORNL division finance managers or division finance officers to obtain information concerning projected funding levels of programs and facilities they manage. Although TSS has no direct responsibility for the maintenance or repair of real property, it does perform breakdown maintenance, preventive maintenance and calibration of laboratory, production, and experimental equipment, all of which is used for programmatic purposes. Operating expense funds from supported divisions support this type of equipment.

  1. Interim measure work plan/design for Agra, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2008-11-18T23:59:59.000Z

    This Interim Measure Work Plan/Design (IMWP/D) is supplemental to the Argonne document Interim Measure Conceptual Design for Remediation of Source Area Contamination at Agra, Kansas. The IMWP/D includes information required by Kansas Department of Health and Environment (KDHE) Policy BER-RS-029, Policy and Scope of Work for Interim Measures. Specific to Policy BER-RS-029 is the requirement for several documents that will ensure that an adequate amount and type of data are collected for implementation of the IMWP/D and that data quality and safe conditions are prevailed. Such information is included in the IMWP/D as follows: Appendix A: Data Acquisition Plan--Design Testing Requirements; Appendix B: Basis of Design; Appendix C: Permits; Appendix D: Quality Assurance Project Plan; Appendix E: Health and Safety Plan; and Appendix F: Operations, Maintenance, and Monitoring Schedule. The proposed remedial technology for this project is the installation of five large-diameter boreholes (LDBs) in a source area that has been identified on the property formerly used for grain storage by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The goal of the LDB technology is the remediation of the source area by removal of mass quantities of contaminated soil from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. Secondary to the soil remediation is the remediation of groundwater at and adjacent to the source areas. The LDB technology serves the following purposes: (1) The physical removal of contaminated soil from the identified source area. (2) Replacement of less permeable native materials (silty clay, clayey silt, and silty sand) with more permeable materials to facilitate the capture of volatilized contaminants in the vertical borehole. (3) Removal of contaminants volatilized by air sparging (AS) and extracted from the vadose zone by soil vapor extraction (SVE). (4) Volatilization of contaminants from portions of the affected aquifer that can be accessed from the former CCC/USDA property. The primary objective of the proposed removal action is removal of mass quantities of carbon tetrachloride from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area, to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. This objective will be the basis for evaluating system performance. The scope of action outlined in the IMWP/D is limited to the five treatment zones defined by the LDB/SVE/AS locations. Surrounding soils and groundwater will benefit; however, remedial benefits to groundwater will be limited to the area of influence associated with the five treatment zones. While treatment should be aggressive in the vicinity of the LDB locations, the heterogeneity, clay content, and low permeability of the soils will place inherent limits on the area of influence.

  2. Chestnut Ridge Borrow Area Waste Pile work plan

    SciTech Connect (OSTI)

    Johnson, R. (Oak Ridge Y-12 Plant, TN (United States))

    1991-08-01T23:59:59.000Z

    The US Department of Energy (DOE), through its contractor Martin Marietta Energy Systems, Inc., has constructed a storage facility, the Chestnut Ridge Borrow Area Waste Pile (CRBAWP), for mercury-contaminated soil excavated from the Oak Ridge Civic Center properties and the Oak Ridge Sewer Line Beltway. Excavation of the soil from the Civic Center began in September 1984 and was completed in early 1985. Similar soils from other areas of the city were added to the pile until 1987. Approximately 3000 yd{sup 3} are stored at the present time. An Interim Status RCRA permit was initially sought for this facility. Samples from the waste pile passed the Extraction Procedure Toxicity Test (EP Tox). The Tennessee Department of Health and Environment (now the Tennessee Department of Conservation-TDC) denied the permit based on their conclusion that the waste was not a RCRA-regulated waste. On September 25, 1990 the Toxicity Characteristic Leaching Procedure (TCLP) superseded the EP Tox test. TCLP tests are not proposed to satisfy a request by TDC and to make a final determination of the nature of the soils in order to close the CRBAWP as a solid waste disposal facility under Tennessee State rule 1200-1-7-.04. The objectives of this work are to summarize existing site information and detail actions necessary to sample and characterize soils from the waste pile as hazardous or nonhazardous per the Toxicity Characteristic Leaching Procedure (TCLP). Within the scope of this plan, a site investigation will be discussed; a field sampling plan will be described in terms of sampling locations, procedures, and quality assurance; and ancillary activities such as waste management, data management, and health and safety will be outlines. 15 refs., 7 figs., 2 tabs.

  3. Building system integration research: recommendations for a US Department of Energy multiyear program plan

    SciTech Connect (OSTI)

    Not Available

    1986-01-01T23:59:59.000Z

    This plan describes the scope, technical content, and resources required to conduct the Building System Integration (BSI) research program during FY 1987 through 1991. System integration research is defined, the need for the research is discussed, its benefits are outlined, and the history of building system integration research is summarized. The program scope, the general approach taken in developing this program plan, and the plan's contents are also described.

  4. Technical Work Plan For: Meteorological Monitoring Data Analysis

    SciTech Connect (OSTI)

    R. Green

    2006-02-06T23:59:59.000Z

    The meteorological monitoring and analysis program has five objectives. (1) Acquire qualified meteorological data from YMP meteorological monitoring network using appropriate controls on measuring and test equipment. Because this activity is monitoring (i.e., recording naturally occurring events) pre-test predictions are not applicable. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The meteorological monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. (2) Process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. (3) Develop analyses or calculations to provide information to data requesters and provide data sets as requested. (4) Provide precipitation amounts to Site Operations to support requirements to perform inspections in the Stormwater Pollution Prevention Plan (implemented in LP-OM-050Q-BSC) following storm events of greater than 0.5 inches. The program also provides meteorological data during extreme weather conditions (e.g., high winds, rainstorms, etc.) to support decisions regarding worker safety. (5) Collect samples of precipitation for chemical and isotopic analysis by the United States Geological Survey (USGS). The BSC ES&H Environmental Compliance organization is responsible for performing this work. Data from calendar-year periods are submitted to the TDMS to provide YMP users with qualified meteorological data for scientific modeling and analyses, engineering designs of surface facilities, performance assessment analyses, and operational safety issues.

  5. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    SciTech Connect (OSTI)

    DOE/NV

    2001-04-05T23:59:59.000Z

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  6. Final work plan for targeted investigation at Hilton, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2007-08-28T23:59:59.000Z

    This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

  7. Civil Works Planning Overview Civil Works (CW) Planning offers a structured, rational approach to solving water resources

    E-Print Network [OSTI]

    US Army Corps of Engineers

    , the current design and construction program is largely a result of project authorizations. · Planning); and several implementing policies. · CW Planning is the start of the "pipeline" for addressing water resources

  8. PPC Recommendations to Amend the Northwest Electric Power and Conservation Planning Council's

    E-Print Network [OSTI]

    system. A. The Council's Mainstem Plan, the Federal Agencies and the BiOp It is not helpful to have dueling plans for operation of the FCRPS. PPC would therefore like to see all the Federal agencies take efforts (both fish and power). Some federal agencies have ignored or denigrated the Act and Council

  9. NEAMS Software Licensing, Release, and Distribution: Implications for FY2013 Work Package Planning

    SciTech Connect (OSTI)

    Bernholdt, David E [ORNL

    2012-06-01T23:59:59.000Z

    The vision of the NEAMS program is to bring truly predictive modeling and simulation (M&S) capabilities to the nuclear engineering community in order to enable a new approach to the analysis of nuclear systems. NEAMS anticipates issuing in FY 2018 a full release of its computational 'Fermi Toolkit' aimed at advanced reactor and fuel cycles. The NEAMS toolkit involves extensive software development activities, some of which have already been underway for several years, however, the Advanced Modeling and Simulation Office (AMSO), which sponsors the NEAMS program, has not yet issued any official guidance regarding software licensing, release, and distribution policies. This motivated an FY12 task in the Capability Transfer work package to develop and recommend an appropriate set of policies. The current preliminary report is intended to provide awareness of issues with implications for work package planning for FY13. We anticipate a small amount of effort associated with putting into place formal licenses and contributor agreements for NEAMS software which doesn't already have them. We do not anticipate any additional effort or costs associated with software release procedures or schedules beyond those dictated by the quality expectations for the software. The largest potential costs we anticipate would be associated with the setup and maintenance of shared code repositories for development and early access to NEAMS software products. We also anticipate an opportunity, with modest associated costs, to work with the Radiation Safety Information Computational Center (RSICC) to clarify export control assessment policies for software under development.

  10. Enterprise Assessments Targeted Review of Work Planning and Control...

    Energy Savers [EERE]

    Plan EA Office of Enterprise Assessments EM Office of Environmental Management EPC Engineering, Projects, and Construction ESQ Environmental Safety and Quality FR Facility...

  11. Health and Safety Work Plan for Sampling Colloids in Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Marsh, J.D.; McCarthy, J.F.

    1994-01-01T23:59:59.000Z

    This Work Plan/Site Safety and Health Plan (SSHP) and the attached work plan are for the performance of the colloid project at WAG 5. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division (ESD) and associated ORNL environmental, safety, and health support groups. The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.

  12. Recommendations for Amendments--Mainstem Columbia/Snake Rivers Elements of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program

    E-Print Network [OSTI]

    to operate the FCRPS to maximize energy revenue so Bonneville can pay its nuclear power plant gambling debtsRecommendations for Amendments--Mainstem Columbia/Snake Rivers Elements of the Northwest Power to the Northwest Power Planning Council's March 14, 2001 request for recommended amendments to the mainstem

  13. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    SciTech Connect (OSTI)

    McCormack, R.L.

    1995-08-01T23:59:59.000Z

    This document describes the plans of the Hanford Site for the safe interim storage of fissile materials. Currently, spent nuclear fuels reside in storage basins that have leaked in the past and are projected to leak in the future. Other problems in the basins include; sludge from decomposition, degraded cladding of fuel elements, and construction defects which make the basins seismically unsafe. This management plan describes the time and cost that it will take to implement a safe interim storage plan for the fissile materials.

  14. Pushing Working Families into Poverty: Assessing the New Haven Plan to

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Pushing Working Families into Poverty: Assessing the New Haven Plan to Privatize the Public Schools, Amherst March 2011 #12;Pushing Working Families into Poverty: Assessing the New Haven Plan to Privatize Working Families into Poverty March 2011 Page 1 of 24 SUMMARY The City of New Haven is considering

  15. KEY ELEMENTS FOR ECOLOGICAL PLANNING: MANAGEMENT PRINCIPLES, RECOMMENDATIONS, AND GUIDELINES FOR FEDERAL LANDS

    E-Print Network [OSTI]

    Keeton, William S.

    Ecosystem Management Project Columbia River Bioregion Campaign Science Working Group 41 South Palouse Street

  16. Status Update on Action 2a: Implementation Handbook for Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by James Winter, NA-00-10. DOE Handbook: Implementing Activity-Level Work Planning & Control at Nuclear Facilities. Project Justification Statement submitted 1-29-13, with focus upon improved implementation of WP&C and activity-level work. Provides the background, project plan, and key elements of a new DOE handbook on implementing activity-level work planning and control at DOE nuclear facilities.

  17. Lesson Learned by Lawrence Livermore National Laboratory Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Donna J. Governor, Lawrence Livermore National Laboratory. Lessons Learned by Lawrence Livermore National Laboratory Activity-Level Work Planning & Control.

  18. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2005-09-26T23:59:59.000Z

    This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

  19. Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning...

    Open Energy Info (EERE)

    ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Focus Area Forestry, Greenhouse Gas Topics Background analysis, Low emission development planning, -LEDS,...

  20. Lesson Learned by Environmental Management Complex-wide Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Office of Environmental Management Work Planning and Control Oversight. Contractor Good Practices and DOE EM Good Practices.

  1. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents.

  2. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  3. Chemical Hygiene Plan The purpose of the Chemical Hygiene Plan (CHP) is to outline laboratory work

    E-Print Network [OSTI]

    de Lijser, Peter

    Chemical Hygiene Plan I. Policy The purpose of the Chemical Hygiene Plan (CHP) is to outline The Chemical Hygiene Plan, required to comply with provisions of CCR Title 8 §5191 et al: A. Standard Operating engineering controls, the use of personnel protective equipment and hygiene practices. C. A requirement

  4. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01T23:59:59.000Z

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

  5. Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development

    Broader source: Energy.gov [DOE]

    Slide Presentation by Rich Davies, Kami Lowry, Mike Schlender, Pacific Northwest National Laboratory (PNNL) and Ted Pietrok, Pacific Northwest Site Office (PNSO). Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development. Work Planning and Control (WP&C) is essential to assuring the safety of workers and the public regardless of the scope of work Research and Development (R&D) activities are no exception.

  6. Office of Enterprise Assessments Targeted Review of Work Planning...

    Broader source: Energy.gov (indexed) [DOE]

    that includes thorough understanding of the technical basis for the work and a search for failure modes that can cause accidents to occur. Section 5.3 of Manual 471012...

  7. Site Visit Report - Independent Oversight Review of Work Planning...

    Broader source: Energy.gov (indexed) [DOE]

    the AHAs, and pre-job briefings for three work activities were observed (i.e., at the Smelter D&D, the C-400 Commissioning Project, and the discharge of water from the C-613...

  8. Enterprise Assessments Targeted Review, Work Planning and Control at the

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Departmentof EnergyPublic LawEnergyEnhanced5Plant2014 |Hanford

  9. Transportation Plan Ad Hoc Working Group | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2Uranium Transferon theTed DonatEnergyDepartment of EnergyPlan Ad Hoc

  10. EFCOG Integrated Safety Management Work Planning and Control | Department

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department ofNotices | Department of36CoolEERE Website Contact4of

  11. Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft

    SciTech Connect (OSTI)

    NONE

    1996-11-01T23:59:59.000Z

    This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts.

  12. Work plan addendum for the remedial investigation and feasibility study of the Salmon Site

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of Energy (DOE) is conducting a focused and phased site characterization as a part, of the RI/FS. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) for evaluating hazardous waste sites on the National Priorities List (NPL). The SS is not listed on the NPL, but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA.

  13. HUMAN RESOURCES WORKING GROUP: ACTION PLAN VISION PRIORITY: MAXIMIZING OUR HUMAN RESOURCES

    E-Print Network [OSTI]

    Sheridan, Jennifer

    HUMAN RESOURCES WORKING GROUP: ACTION PLAN VISION PRIORITY: MAXIMIZING OUR HUMAN RESOURCES, and student body." From David Ward, "A Vision for the Future," p. 9. This document lists the human-resource goals and plans of the Office of Human Resources, the Equity and Diversity Resource Center

  14. University of Glasgow Carbon Management Programme Carbon Management Plan working with

    E-Print Network [OSTI]

    Mottram, Nigel

    fully in the initiatives which will help us reduce our carbon footprint and combat climate changeUniversity of Glasgow Carbon Management Programme Carbon Management Plan working with Page 1 Carbon Management Programme Carbon Management Plan (CMP) Albert Young, 3 November 2009 #12;University of Glasgow

  15. Lessons Learned in Optimizing Workers' and Worker Representatives' Input to Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Tom McQuiston, Dr. P.H., United Steelworkers - Tony Mazzocchi Center for Health, Safety and Environmental Education. Lessons Learned in Optimizing Workers’ and Worker Representatives’ Input in Work Planning and Control.

  16. Contractor Work Planning and Control Lessons Learned from DOE and International Projects

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bob McQuinn; URS Global Management and Operations Services; Frank McCoy and Rick Runnels; URS - Professional Solutions. Contractor Work Planning and Control-URS Lessons Learned.

  17. Single-shell tank closure work plan. Revision A

    SciTech Connect (OSTI)

    NONE

    1995-06-01T23:59:59.000Z

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  18. RISMC ADVANCED SAFETY ANALYSIS WORKING PLAN – FY 2015 – FY 2019

    SciTech Connect (OSTI)

    Szilard, Ronaldo H; Smith, Curtis L

    2014-09-01T23:59:59.000Z

    SUMMARY In this report, the Advanced Safety Analysis Program (ASAP) objectives and value proposition is described. ASAP focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. The set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. As part of the discussion, we have identified three sets of stakeholders, the nuclear industry, the Department of Energy (DOE), and associated oversight organizations. These three groups would benefit from ASAP in different ways. For example, within the DOE complex, the possible applications that are seen include the safety of experimental reactors, facility life extension, safety-by-design in future generation advanced reactors, and managing security for the storage of nuclear material. This report provides information in five areas: 1. A value proposition (“why is this important?”) that will make the case for stakeholder’s use of the ASAP research and development (R&D) products. 2. An identification of likely end users and pathway to adoption of enhanced tools by the end-users. 3. A proposed set of practical and achievable “use case” demonstrations. 4. A proposed plan to address ASAP verification and validation (V&V) needs. 5. A proposed schedule for the multi-year ASAP.

  19. Lessons Learned at the Nevada National Security Site Implementing the EFCOG Activity-level Work Planning and Control Guide

    Broader source: Energy.gov [DOE]

    Slide Presentation by Steele Coddington, Work Planning Manager, National Security Technologies, Nevada National Security Site. Lessons Learned Implementing Work Planning & Control. 6 Step Process for improving WP&C.

  20. RFI/RI work plan for the Road A Chemical Basin 904-111G

    SciTech Connect (OSTI)

    Kmetz, T.F.

    2000-03-07T23:59:59.000Z

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.

  1. Work Plan - U.S.-India Coal Working Group | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2, 2015Visiting Strong,Women @ Energy:Terri Quinn Women12.1AWork Plan -

  2. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    SciTech Connect (OSTI)

    Pentecost, E.D.; Vinikour, W.S. [Argonne National Lab., IL (United States)

    1993-08-01T23:59:59.000Z

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods.

  3. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    SciTech Connect (OSTI)

    Moore, D.A.

    1994-09-01T23:59:59.000Z

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan.

  4. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-12-22T23:59:59.000Z

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  5. Draft Level 1 Remedial Investigation Work Plan: 316-3 waste disposal trenches

    SciTech Connect (OSTI)

    Not Available

    1987-09-01T23:59:59.000Z

    This work plan describes the work to be performed for the initial level of site characterization for the 316.3 Trenches at the Hanford Site. This initial site characterization effort will include a review of existing environmental contamination data for the 300 Area as well as collection and analysis of environmental samples to better characterize subsurface contamination at the site. 7 refs., 10 figs., 7 tabs.

  6. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  7. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-03-01T23:59:59.000Z

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  8. Project Work Plan: Hanford 100-D Area Treatability Demonstration - In Situ Biostimulation for Reducing Barrier

    SciTech Connect (OSTI)

    Fruchter, Jonathan S.; Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.

    2006-05-31T23:59:59.000Z

    This work plan supports a new, integrated approach to accelerate cleanup of chromium in the Hanford 100 Areas. This new approach will provide supplemental treatment upgradient of the ISRM barrier by directly treating chromium and other oxidizing species in groundwater (i.e., nitrate and dissolved oxygen), thereby increasing the longevity of the ISRM barrier and protecting the ecological receptors and human health at the river boundary.

  9. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    SciTech Connect (OSTI)

    NONE

    1995-07-01T23:59:59.000Z

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement.

  10. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    SciTech Connect (OSTI)

    Burton, J. C.; Environmental Research

    2003-01-23T23:59:59.000Z

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic mistake sometimes made in the site characterization process is failure to use technically sound available data to form working hypotheses on hydrogeology, contaminant distribution, etc. for initial testing. (3) After assembling and interpreting existing data for the site, the entire technical team visits the site to identify as a group the site characteristics that might prohibit or enhance any particular technological approach. Logistic and community constraints are also identified at this point. (4) After the field visit, the team selects a suite of technologies appropriate to the problem and completes the design of the field program. No one technique works well at all sites, and a suite of techniques is necessary to delineate site features fully. In addition, multiple technologies are employed to increase confidence in conclusions about site features. Noninvasive and minimally invasive technologies are emphasized to minimize risk to the environment, the community, and the staff. In no case is the traditional approach of installing a massive number of monitoring wells followed. A dynamic work plan that outlines the program is produced for the sponsoring and regulatory agencies. The word ''dynamic'' is emphasized because the work plan is viewed as a guide, subject to modification, for the site characterization activity, rather than a document that is absolute and unchangeable. Therefore, the health and safety plan and the quality assurance/quality control plan must be broad and encompass all possible alterations to the plan. The cooperation of the regulating agency is essential in successful implementation of this process. The sponsoring and regulatory agencies are notified if significant changes to the site-specific work plan are necessary. (5) The entire team participates in the technical field program. Several technical activities are undertaken simultaneously. These may range from different surface geophysics investigations to vegetation sampling. Data from the various activities are reduced and interpreted each day by the technical staff. Various computer prog

  11. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    SciTech Connect (OSTI)

    SCHULTZ, E.A.

    1998-10-01T23:59:59.000Z

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  12. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    SciTech Connect (OSTI)

    MCCARTHY, M.M.

    1999-08-01T23:59:59.000Z

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  13. Technical work plan for the privatization waste characterization data quality objective process

    SciTech Connect (OSTI)

    Kirkbride, R.A.

    1996-04-24T23:59:59.000Z

    This work plan addresses the activities necessary to complete the data quality objectives process for the purpose of providing sufficient characterization information to successfully stage, pretreat, and immobilize low-activity waste per the requirements and specifications identified in the Tank Waste Remediation System Privatization Request for Proposal. The scope of this task is to complete the data quality objectives process, the results of which will provide a technical basis for sampling and characterization needs related to privatization of pretreatment and low-activity waste immobilization.

  14. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the sediment transport modeling task

    SciTech Connect (OSTI)

    Holt, V.L.; Baron, L.A.

    1994-05-01T23:59:59.000Z

    This site-specific Work Plan/Health and Safety Checklist (WP/HSC) is a supplement to the general health and safety plan (HASP) for Waste Area Grouping (WAG) 2 remedial investigation and site investigation (WAG 2 RI&SI) activities [Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169)] and provides specific details and requirements for the WAG 2 RI&SI Sediment Transport Modeling Task. This WP/HSC identifies specific site operations, site hazards, and any recommendations by Oak Ridge National Laboratory (ORNL) health and safety organizations [i.e., Industrial Hygiene (IH), Health Physics (HP), and/or Industrial Safety] that would contribute to the safe completion of the WAG 2 RI&SI. Together, the general HASP for the WAG 2 RI&SI (ORNL/ER-169) and the completed site-specific WP/HSC meet the health and safety planning requirements specified by 29 CFR 1910.120 and the ORNL Hazardous Waste Operations and Emergency Response (HAZWOPER) Program Manual. In addition to the health and safety information provided in the general HASP for the WAG 2 RI&SI, details concerning the site-specific task are elaborated in this site-specific WP/HSC, and both documents, as well as all pertinent procedures referenced therein, will be reviewed by all field personnel prior to beginning operations.

  15. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  16. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  17. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1995-08-01T23:59:59.000Z

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  18. Demonstration testing and evaluation of in situ soil heating. Treatability study work plan (Revision 2)

    SciTech Connect (OSTI)

    Sresty, G.C.

    1994-12-30T23:59:59.000Z

    A Treatability Study planned for the demonstration of the in situ electromagnetic (EM) heating process to remove organic solvents is described in this Work Plan. The treatability study will be conducted by heating subsurface vadose-zone soils in an organic plume adjacent to the Classified Burial Ground K-1070-D located at K-25 Site, Oak Ridge. The test is scheduled to start during the fourth quarter of FY94 and will be completed during the first quarter of FY95. Over the last nine years, a number of Government agencies (EPA, Army, AF, and DOE) and industries sponsored further development and testing of the in situ heating and soil decontamination process for the remediation of soils containing hazardous organic contaminants. In this process the soil is heated in situ using electrical energy. The contaminants are removed from the soil due to enhanced vaporization, steam distillation and stripping. IITRI will demonstrate the EM Process for in situ soil decontamination at K-25 Site under the proposed treatability study. Most of the contaminants of concern are volatile organics which can be removed by heating the soil to a temperature range of 85{degrees} to 95{degrees}C. The efficiency of the treatment will be determined by comparing the concentration of contaminants in soil samples. Samples will be obtained before and after the demonstration for a measurement of the concentration of contaminants of concern. This document is a Treatability Study Work Plan for the demonstration program. The document contains a description of the proposed treatability study, background of the EM heating process, description of the field equipment, and demonstration test design.

  19. Review of nuclear power plant safety cable aging studies with recommendations for improved approaches and for future work.

    SciTech Connect (OSTI)

    Gillen, Kenneth Todd; Bernstein, Robert

    2010-11-01T23:59:59.000Z

    Many U. S. nuclear power plants are approaching 40 years of age and there is a desire to extend their life for up to 100 total years. Safety-related cables were originally qualified for nuclear power plant applications based on IEEE Standards that were published in 1974. The qualifications involved procedures to simulate 40 years of life under ambient power plant aging conditions followed by simulated loss of coolant accident (LOCA). Over the past 35 years or so, substantial efforts were devoted to determining whether the aging assumptions allowed by the original IEEE Standards could be improved upon. These studies led to better accelerated aging methods so that more confident 40-year lifetime predictions became available. Since there is now a desire to potentially extend the life of nuclear power plants way beyond the original 40 year life, there is an interest in reviewing and critiquing the current state-of-the-art in simulating cable aging. These are two of the goals of this report where the discussion is concentrated on the progress made over the past 15 years or so and highlights the most thorough and careful published studies. An additional goal of the report is to suggest work that might prove helpful in answering some of the questions and dealing with some of the issues that still remain with respect to simulating the aging and predicting the lifetimes of safety-related cable materials.

  20. Hanford environmental management program multi-year work plan FY1998

    SciTech Connect (OSTI)

    Giese, K.A.

    1997-08-25T23:59:59.000Z

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year`s work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ``Work Authorization`` identifies the impacted scope and requires the Contracting Officer`s or Assistant Manager-Contracting Officer`s Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ``Project Summary Section`` and Section Two is titled the ``Additional Sections at the Project Baseline Summaries Level``. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS {number_sign} RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP, exclusive of the other programs under the Mission Support PBS. This MYWP thus has a Section One that speaks to two programs, and two Section Two`s, one each for HEMP and EEM.

  1. Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2

    SciTech Connect (OSTI)

    Dail, J.L.; Nanstad, L.D.; White, R.K.

    1995-06-01T23:59:59.000Z

    This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ``scores`` and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process.

  2. BY GEORG ZACHMANN BRUEGEL BLUEPRINT SERIESBRUEGEL BLUEPRINT SERIES Volume XX Electricity without borders: a plan to make the internal market work

    E-Print Network [OSTI]

    Georg Zachmann; Production Michael; T. Harrington; Cover Jean-yves Verdu

    Electricity without borders: a plan to make the internal market work BY GEORG ZACHMANN BRUEGEL BLUEPRINT 20Electricity without borders:aplanto make the internal market work

  3. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains a discussion of the chemical safety improvements planned or already underway at DOE sites to correct facility or site-specific vulnerabilities. The main part of the report is a discussion of each of the programmatic deficiencies; a description of the tasks to be accomplished; the specific actions to be taken; and the organizational responsibilities for implementation.

  4. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  5. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  6. Remedial Investigation Work Plan for J-Field, Aberdeen Proving Ground, Maryland

    SciTech Connect (OSTI)

    Benioff, P.; Biang, R.; Dolak, D.; Dunn, C.; Haffenden, R.; Martino, L.; Patton, T.; Wang, Y.; Yuen, C.

    1995-03-01T23:59:59.000Z

    The purpose of an RI/FS is to characterize the nature and extent of the risks posed by contaminants present at a site and to develop and evaluate options for remedial actions. The overall objective of the RI is to provide a comprehensive evaluation of site conditions, types and quantities of contaminants present, release mechanisms and migration pathways, target populations, and risks to human health and the environment. The information developed during the RI provides the basis for the design and implementation of remedial actions during the FS. The purpose of this RI Work Plan is to define the tasks that will direct the remedial investigation of the J-Field site at APG.

  7. BEDES Strategic Working Group Recommendations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube platform is alwaysISOSource1-01 Audit LetterYearAvi Shultz Avi7

  8. Engineering work plan for PFP criticality alarm panel first unit re-build

    SciTech Connect (OSTI)

    Clem, W.E.

    1994-09-14T23:59:59.000Z

    This document describes the first step in increasing the quality, reliability, and ease of maintenance of the nine Criticality Alarm Panels (CAP) at PFP. Development control practices and guidelines of WHC-CM-6-1, EP-2.4 and WHC-IP-1026, EPG-2.4 are applied to develop a prototype of a replacement Criticality Alarm Panel (CAP) with facility-use potential. During the development of the prototype CAP, the design requirements of all of PFP`s nine CAPs are considered to develop standardized hardware and detailed design drawings that are tailored to PFP maintenance needs. Increased quality and reliability is achieved through quality hardware, proven technology and design techniques, and the use of the Class 1E workmanship standards of WHC-CM-8-1. The end result of the work described by this work plan is a verified/read-to-install replacement for CAP Z4 and verified/released H-2 drawings that are formatted such that they can easily be replicated when producing design drawings for the other eight CAPs.

  9. Leadership and Stewardship of the Laboratory (Objective 4.1) Notable Outcome - Phase II Alternative Analysis and PNNL Site Plan Recommendation

    SciTech Connect (OSTI)

    Pittman, Jeffery P.; Cassidy, Stephen R.; Mosey, Whitney LC; Leitz, Erlan M.; Oukrop, Lanson J.

    2013-07-31T23:59:59.000Z

    Pacific Northwest National Laboratory (PNNL) and the Pacific Northwest Site Office (PNSO) have recently completed an effort to identify the current state of the campus and gaps that exist with regards to space needs, facilities and infrastructure. This effort has been used to establish a campus strategy to ensure PNNL is ready to further the United States (U.S.) Department of Energy (DOE) mission. Ten-year business projections and the impacts on space needs were assessed and incorporated into the long-term facility plans. In identifying/quantifying the space needs for PNNL, the following categories were addressed: Multi-purpose Programmatic (wet chemistry and imaging laboratory space), Strategic (Systems Engineering and Computation Analytics, and Collaboration space), Remediation (space to offset the loss of the Research Technology Laboratory [RTL] Complex due to decontamination and demolition), and Optimization (the exit of older and less cost-effective facilities). The findings of the space assessment indicate a need for wet chemistry space, imaging space, and strategic space needs associated with systems engineering and collaboration space. Based on the analysis, a 10-year campus strategy evolved that balanced four strategic objectives, as directed by the DOE Office of Science (DOE-SC): • Mission Alignment - maintain customer satisfaction • Reasonable & Achievable - do what makes sense from a practical and cost perspective • Campus Continuity - increase the federal control of assets and follow the Campus Master Plan • Guiding Principles - modern, collaborative, flexible, and sustainable. This strategy considered the following possible approaches to meet the identified space needs: • Institutional General Plant Project (IGPP) funded projects • Third party leased facilities • Science Laboratory Infrastructure (SLI) line item funded projects. Pairing the four strategic objectives with additional key metrics as criteria for selection, an initial recommendation was made to DOE-SC to use all three funding mechanisms to deliver the mission need. DOE-SC provided feedback that third party facilities are not to be pursued at this time. The decision was made by DOE that an IGPP-funded program would be the base plan, while retaining the possibility of a 2019 SLI-funded project. The SLI project will be designed to deliver significant impact on science and technology (S&T) and support the development of a modern, synergistic core campus where a collaborative and innovative environment is fostered. The specific scientific impact will be further defined in the 2015 and 2016 Annual Laboratory Plans. Additionally, opportunities will be explored to construct annexes on current federal facilities, including the Environmental Molecular Sciences Laboratory (EMSL), if proven synergistic and cost effective. The final result of this effort is an actionable, flexible plan with scope, schedule, and cost targets for individual acquisition projects. Implemented as planned, the result will increase federal ownership by approximately 15 percent, reduce the operating cost by approximately 7 percent, and reduce the geographic facility footprint by approximately 66,000 gross square feet (GSF). Reduction of surplus space will be addressed while maintaining customer satisfaction, lowering operating costs, reducing the campus footprint, and increasing the federal control of assets. This strategy is documented in PNNL’s 2014 Laboratory Plan.

  10. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards.

  11. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS).

  12. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

  13. Digital Creation and Preservation Working Group Plan and oversee implementation for the Libraries' digital preservation program, particularly in relation

    E-Print Network [OSTI]

    Schweik, Charles M.

    for the Libraries' digital preservation program, particularly in relation to the Libraries' unique resources to the Digital Strategies Group. Chair: Appointed by the Director of Libraries Membership: Members serveDigital Creation and Preservation Working Group Charge: Plan and oversee implementation

  14. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    SciTech Connect (OSTI)

    ROGERS, P.M.

    2000-06-01T23:59:59.000Z

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  15. ORA Faculty Orientation (Jan or Feb 2015) Proposals: budgets, cost share, statements of works, data management plans

    E-Print Network [OSTI]

    ORA Faculty Orientation (Jan or Feb 2015) Proposals: budgets, cost share, statements of works, data management plans Contracts & subcontracts: terms & conditions, IP, at-risk spending, equipment Awards: allowable costs, payroll forms, travel, billing, project setup & close http://inside.mines

  16. Reducing the impact of chemical releases: U.S. Steel Clairton Works` Early Warning Plan

    SciTech Connect (OSTI)

    York, R.G.; Hart, C.M.; Graeser, W.C.

    1995-12-01T23:59:59.000Z

    The Early Warning Plan (EWP) is a program designed to alert plant personnel to a release of contaminants to a receiving stream before it becomes significant enough to impinge on the environment or the public. It also provides a method of written documentation of any discharge of contaminants so that rapid corrective action can be taken. The EWP includes procedures for monitoring, rapid analytical turnaround, on-site analysis, statistical process control evaluation, and follow-up investigation. It is related to, but separate from other emergency response plans for the Clairton complex. The plant also uses a Spill Prevention, Control, and Countermeasure Plan (SPCC), an Environmental Emergency Response Plan (EERP), an Oil Pollution Act (OPA) Response Plan, and an EPA Facility Response Plan. Major spills and response activities are described in these other plans, but the EWP has served to concentrate on day-to-day plant operations. The paper discusses the driving forces behind the Plan, the EWP, and results of the program after nearly 10 years of operation.

  17. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River.

  18. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-14T23:59:59.000Z

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

  19. Integrated Program of Experimental Diagnostics at the NNSS: An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

    SciTech Connect (OSTI)

    NSTec Mission and Projects Division

    2010-09-30T23:59:59.000Z

    This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories’ (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3?year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

  20. NRC Recommendations

    Broader source: Energy.gov [DOE]

    Presentation on NRC recommendations to the DOE Systems Analysis Workshop held in Washington, D.C. July 28-29, 2004 to discuss and define role of systems analysis in DOE Hydrogen Program.

  1. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    SciTech Connect (OSTI)

    GRYGIEL, M.L.

    1998-10-08T23:59:59.000Z

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baseline and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.

  2. Work plan for the remedial investigation/feasibility study-environmental assessment for the Colonie site, Colonie, New York

    SciTech Connect (OSTI)

    Not Available

    1990-06-01T23:59:59.000Z

    This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes of human exposure to site containments, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. This work also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 48 refs., 18 figs., 25 tabs.

  3. How Planning Works in an Age of Reform: Land, Sustainability, and Housing Development Traditions in Zanzibar

    E-Print Network [OSTI]

    Muhajir, Makame Ali Haji

    2011-04-26T23:59:59.000Z

    ) CMO Chief Minister's Office COLE Commission for Lands and Environment CUF Civic United Front C/TA Chief/Technical Advisor DFP Departmental Focal Point DC District Commissioner DoSUP Department of Surveys and Urban Planning DSA... under the short-lived Commission for Lands and Environment (COLE), itself in existence from 1989 until 2001. The ZILEM project phase included land-use planning, land administration, environmental management, and capacity building components...

  4. Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002)

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-25T23:59:59.000Z

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities will focus on the surface/shallow subsurface sampling and deep subsurface modeling. Suspected potential contaminants of concern for investigative analysis at the Gasbuggy Site include total petroleum hydrocarbons (diesel- and gasoline-range), volatile organic compounds, semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and radionuclides. The results of this characterization and risk assessment will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-site disposal of contaminated waste which will be presented in a subsequent corrective action decision document.

  5. Multi-Year Work Plan to De-Inventory TRU Waste Stored at LANL - 12121

    SciTech Connect (OSTI)

    Johns-Hughes, K.W.; Clemmons, J.S.; Hargis, K.M.; Christensen, D.V.; Shepard, M.D. [Los Alamos National Laboratory, P.O. Box 1663, Los Alamos, New Mexico 87545 (United States); Bishop, M.L. [U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Site Office, 3747 W. Jemez Road, Los Alamos, NM 87545 (United States)

    2012-07-01T23:59:59.000Z

    The Los Alamos National Laboratory (LANL) continues to accelerate disposition of transuranic (TRU) waste stored at its Technical Area 54 (TA-54) Area G waste management facility. The current focus is on complete removal of all non-cemented above-grade Legacy and newly-generated TRU waste that was in storage on October 1, 2011, by no later than June 30, 2014. This inventory of above-grade TRU is defined as 3,706 m{sup 3} of material. Legacy TRU waste containers were placed into storage up to 40 years ago, and most of the older containers must be remediated to address compliance issues before the waste can be characterized, certified as meeting the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC), and shipped for disposition. More than half of the remaining TRU waste volume stored above grade is contained within oversize boxes that contain waste items that must be repackaged or size reduced. Facilities and major types of equipment needed to remediate and characterize the TRU waste inventory are largely in place, but two additional oversize box processing lines are being implemented in 2012. Multiple work shifts are planned for most remediation lines in 2013. An integrated risk-based project management schedule for all disposition activities has been developed that is based on a 'Solution Package' approach. Inventories of containers that have issues in common were compiled into about 15 waste categories and about 70 'Solution Packages' that identify all of the activities needed to disposition the inventory of TRU waste in storage. Scheduled activities include all precursor activities to begin remediation, remediation processing, characterization and certification to the WIPP WAC, and shipping of containers to WIPP. Processing of the 3,706 m{sup 3} is projected to result in about 4,500 55-gallon (208 L) drums and 1,000 standard waste boxes that will be shipped to WIPP. About 385 shipments from LANL to WIPP are projected before June 30, 2014, to ship these containers, at a rate of 5 to 6 shipments a week. (authors)

  6. Solyndra Credit Committee Recommendation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recommendation Jan 2009 Solyndra Credit Committee.pdf More Documents & Publications Open Government Plan 1.0 Fiscal Year 2010 Agency Financial Report Web Improvement Strategy...

  7. Recommendation 221: Recommendation Regarding Recycling of Metals...

    Office of Environmental Management (EM)

    221: Recommendation Regarding Recycling of Metals and Materials Recommendation 221: Recommendation Regarding Recycling of Metals and Materials In addition to the DOE making a final...

  8. Harvey Lynch PPA Dept Heads 16 April 2009 1 Work Planning and Control

    E-Print Network [OSTI]

    Wechsler, Risa H.

    know to the workers, without requiring any permits or plans and where specific ES&H training for Green Workers in Non Office Areas Training (ESH course 121) by 8/31/09. · All lab personnel performing WPC Training (ESH course 120) by 8/31/2009. Note: and their supervisors. · Starting September 2009

  9. NORTHWEST ENERGY EFFICIENCY TASKFORCE REPORT AND RECOMMENDATIONS FOR THE EXECUTIVE COMMITTEE'S

    E-Print Network [OSTI]

    DRAFT NORTHWEST ENERGY EFFICIENCY TASKFORCE REPORT AND RECOMMENDATIONS FOR THE EXECUTIVE COMMITTEE Efficiency IV. Planning that Puts Energy Efficiency First V. The NEET Mission and Work Groups VI. Work Group. Introduction The push for energy efficiency in the Pacific Northwest is facing an unprecedented opportunity

  10. Solid waste program fiscal year 1997 multi-year work plan WBS 1.2.1

    SciTech Connect (OSTI)

    Riddelle, J.G.

    1996-09-30T23:59:59.000Z

    This document provides the technical baseline, work breakdown structure, schedule baseline, cost baseline, and execution year for the solid waste program.

  11. DynCorp Tricities Services, Inc. Hanford fire department FY 1998 annual work plan

    SciTech Connect (OSTI)

    Good, D.E.

    1997-08-19T23:59:59.000Z

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the U.S. Department of Energy operated Hanford site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. This fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This plan provides a program overview, program baselines, and schedule baseline.

  12. McMaster University Waste Reduction Work Plan April 2009 to April 2010

    E-Print Network [OSTI]

    Hitchcock, Adam P.

    for campus deliveries. 33 (30%) Currently working with McMaster's office supplies vendor to limit cardboard a bubbler for drinking, goose neck for refilling chiller to offer cool water. HDPE #2 24.34 Increase of polystyrene in campus deliveries. 5.3 (10%) Currently working with McMaster's office supplies vendor to limit

  13. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

  14. Engineering Work Plan for the Development of Phased Startup Initiative (PSI) Phases 3 and 4 Test Equipment

    SciTech Connect (OSTI)

    PITNER, A.L.

    2000-04-11T23:59:59.000Z

    A number of tools and equipment pieces are required to facilitate planned test operations during Phases 3 and 4 of the Phased Startup Initiative (PSI). These items will be used in assessing residual canister sludge quantities on cleaned fuel assemblies, sorting coarse and fine scrap fuel pieces, assessing the size distribution of scrap pieces, loading scrap into a canister, and measuring the depth of the accumulated scrap in a canister. This work plan supercedes those previously issued for development of several of these test items. These items will be considered prototype equipment until testing has confirmed their suitability for use in K West Basin. The process described in AP-EN-6-032 will be used to qualify the equipment for facility use. These items are considered non-OCRWM for PSI Phase 3 applications. The safety classification of this equipment is General Service, with Quality Level 0 (for PSI Phase 3). Quality Control inspections shall be performed to verify basic dimensions and overall configurations of fabricated components, and any special quality control verifications specified in this work plan (Section 3.1.5). These inspections shall serve to approve the test equipment for use in K West Basin (Acceptance Tag). This equipment is for information gathering only during PSI Phases 3 and 4 activities, and will be discarded at the completion of PSI. For equipment needed to support actual production throughput, development/fabrication/testing activities would be more rigorously controlled.

  15. Research Cloud Computing Recommendations

    E-Print Network [OSTI]

    Qian, Ning

    Research Cloud Computing Recommendations SRCPAC December 3, 2014 #12;Mandate and Membership SRCPAC convened this committee in Sept 2014 to investigate the role that cloud computing should play in our & Academic Affairs (Social Work) #12;Questions discussed · What cloud resources are available? · Which kinds

  16. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1992-09-01T23:59:59.000Z

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  17. Technical Basis for Work Place Air Monitoring for the Plutonium Finishing Plan (PFP)

    SciTech Connect (OSTI)

    JONES, R.A.

    1999-10-06T23:59:59.000Z

    This document establishes the basis for the Plutonium Finishing Plant's (PFP) work place air monitoring program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), Part 835 ''Occupational Radiation Protection''; Hanford Site Radiological Control Manual (HSRCM-1); HNF-PRO-33 1, Work Place Air Monitoring; WHC-SD-CP-SAR-021, Plutonium Finishing Plant Final Safety Analysis Report; and Applicable recognized national standards invoked by DOE Orders and Policies.

  18. Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment

    SciTech Connect (OSTI)

    Not Available

    1994-04-01T23:59:59.000Z

    DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

  19. Enterprise Assessments Targeted Review of Work Planning and Control at the

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Departmentof EnergyPublic LawEnergyEnhanced5Plant2014 |

  20. CFN Ops Plan | Work Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    teams consist of the primary reviewer, subject matter experts (such as Industrial Hygiene staff and the Environmental Compliance Representative), the WCC, the service...

  1. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    SciTech Connect (OSTI)

    Slaybaugh, R.R.

    1997-08-29T23:59:59.000Z

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  2. New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect (OSTI)

    Nelson, L. O.

    2007-06-12T23:59:59.000Z

    This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

  3. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect (OSTI)

    D. Vandel

    2003-09-01T23:59:59.000Z

    This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

  4. Activity-level Work Planning and Control in the Hanford Site Worker Evaluation Tool

    Broader source: Energy.gov [DOE]

    Slide Presentation by Ted Giltz, Volpentest HAMMER Federal Training Center. Hanford Site Worker Eligibility Tool, Verifying Activity-Level Worker Medical Clearance and Training. The Hanford Site Worker Eligibility Tool (HSWET) provides line management an easy to use tool to determine if workers are medically cleared and trained to perform work safely.

  5. 2012 Bioenergy Action Plan Prepared by the Bioenergy Interagency Working Group

    E-Print Network [OSTI]

    and the California Energy Commission with input from the Bioenergy Interagency Working Group. This report to Governor Edmund G. Brown Karen Ross Secretary, Department of Food and Agriculture Matthew Rodriquez, California Energy Commission Ken Pimlott Director, Department of Forestry and Fire Protection Caroll

  6. Final work plan : Phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Savannah, Missouri.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2007-10-12T23:59:59.000Z

    From approximately 1949 until 1970, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility on federally owned property approximately 0.25 mi northwest of Savannah, Missouri. During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In November 1998, carbon tetrachloride was detected in a private well (Morgan) roughly 50 ft south of the former CCC/USDA facility, as a result of state-wide screening of private wells near former CCC/USDA facilities, conducted in Missouri by the U.S. Environmental Protection Agency (EPA 1999). The 1998 and subsequent investigations by the EPA and the Missouri Department of Natural Resources (MoDNR) confirmed the presence of carbon tetrachloride in the Morgan well, as well as in a second well (on property currently occupied by the Missouri Department of Transportation [MoDOT]), approximately 400 ft east of the former CCC/USDA facility. Carbon tetrachloride concentrations in the Morgan well have ranged from the initial value of 29 {micro}g/L in 1998, up to a maximum of 61 {micro}g/L in 1999, and back down to 22 {micro}g/L in 2005. The carbon tetrachloride concentration in the MoDOT well in 2000 (the only time it was sampled) was 321 {micro}g/L. The concentrations for the two wells are above the EPA maximum contaminant level (MCL) of 5 {micro}g/L for carbon tetrachloride (EPA 1999; MoDNR 2000a,b). Because the observed contamination in the Morgan and MoDOT wells might be linked to the past use of carbon tetrachloride-based grain fumigants at its former grain storage facility, the CCC/USDA will conduct investigations to (1) characterize the source(s), extent, and factors controlling the subsurface distribution and movement of carbon tetrachloride at Savannah and (2) evaluate the health and environmental threats potentially posed by the contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigative activities at Savannah will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with the DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Savannah will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Savannah investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Savannah site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne will issue a Provisional Master Work Plan (PMWP; Argonne 2007) that will be submitted to the MoDNR for review and approval. The agency has already reviewed and approved (with minor changes) the present Master Work Plan (Argonne 2002) under which Argonne currently operates in Kansas. The PMWP (Argonne 2007) will provide detailed information and guidance on the investigative technologies, analytical methodologies, quality assurance-quality control measures, and general health and safety policies to be employed by Argonne for all investigations at former CCC/USDA grain storage facilities in Missouri. Both the PMWP

  7. Status Update on Action 2c: Criteria Review and Approach Document (CRAD) for Performing Assessments of Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bradley K. Davy, Director, Office of Worker Safety and Health Assistance, HS. Criteria Review and Approach Document (CRAD) for Performing Assessments of Activity- Level Work Planning and Control. DOE CRAD Development Approach.

  8. Hanford fire department FY 99 annual work plan WBS 6.5.7

    SciTech Connect (OSTI)

    GOOD, D.E.

    1999-02-24T23:59:59.000Z

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing a full range of services at the lowest possible cost to customers. These services include fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, the general public, or interest of the U. S. Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. The fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education.

  9. Engineering Work Plan for Development of Sludge Pickup Adapter for Fuel Cleanliness Inspections

    SciTech Connect (OSTI)

    PITNER, A.L.

    2000-01-06T23:59:59.000Z

    The plan for developing an adapter to suction up sludge into a calibrated tube for fuel cleanliness inspection activities is described. A primary assessment of fuel cleanliness to be performed after processing through the Primary Cleaning Machine is whether the volume of any remaining canister sludge in or on a fuel assembly exceeds the allowable 14 cm{sup 3} limit. It is anticipated that a general visual inspection of the sludge inventory after fuel assembly separation will usually suffice in making this assessment, but occasions may arise where there is some question as to whether or not the observed quantity of sludge exceeds this limit. Therefore a quantitative method of collecting and measuring the sludge volume is needed for these borderline situations. It is proposed to develop an adapter that fits on the end of the secondary cleaning station vacuum wand that will suction the material from the sludge collection tray into a chamber marked with the limiting volume to permit a direct go/no-go assessment of the sludge quantity.

  10. 2001-2002 Long Range Plan Working Group Members | U.S. DOE Office of

    Office of Science (SC) Website

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron4(SC) Mapping the ImpactSCDOE Office ofThe LifeUserWork's The's's

  11. 2007 Long Range Plan Working Group Members | U.S. DOE Office of Science

    Office of Science (SC) Website

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron4(SC) Mapping the ImpactSCDOE Office ofThe LifeUserWork's

  12. Economic transition FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 7.4.9

    SciTech Connect (OSTI)

    Schwenk, R.M.

    1994-09-01T23:59:59.000Z

    The mission of the WHC Economic Transition Center is to support Hanford`s cleanup mission and to leverage the assets of that mission to promote diversification and long-term sustainability of the regional economy and workforce. Conducting an economic transition program is imperative at sites such as Hanford, which are faced with transition from a defense production mission to a massive cleanup mission, followed by rampdown and site closure. At issue are the human and physical resources of the Site and the final disposition of those resources. Without an effective economic transition program, the federal government will have invested billions of dollars to achieve environmental regulatory compliance without generating any greater return on investment. With an effective economic transition program, the potential exists to redeploy the highly skilled, well-trained, and educated workforce developed and utilized during the Site`s cleanup mission and find productive uses for land, facilities, and equipment. The Economic Transition Center has been divided into the following business areas: outsourcing; spinoffs; technology acquisition; technology transfer; conversion; and cross-cutting partnerships. A work package has been developed for each of these business areas in this Fiscal Year Work Plan.

  13. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 543: LIQUID DISPOSAL UNITS, NEVADA TEST SITE, NEVADA

    SciTech Connect (OSTI)

    NONE

    2006-09-01T23:59:59.000Z

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved Corrective Action Decision Document.

  14. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 300: SURFACE RELEASE AREAS NEVADA TEST SITE, NEVADA

    SciTech Connect (OSTI)

    NONE

    2006-07-01T23:59:59.000Z

    The purpose of this Corrective Action Plan (CAP) is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 300 CADD.

  15. UWM Research Planning Report Kohls Group Consulting2 Table of Contents Page

    E-Print Network [OSTI]

    Saldin, Dilano

    · · #12;UWM Research Planning Report Kohls Group Consulting2 Table of Contents Page Executive for development of an implementation plan. These recommendations are the work products of eight subcommittees. The subcommittees met from #12;UWM Research Planning Report Kohls Group Consulting3 January to April 2011. Each

  16. Final work plan : phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Montgomery City, Missouri.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2010-08-16T23:59:59.000Z

    From September 1949 until September 1966, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) leased property at the southeastern end of Montgomery City, Missouri, for the operation of a grain storage facility. During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In January 2000, carbon tetrachloride was detected in a soil sample (220 {micro}g/kg) and two soil gas samples (58 {micro}g/m{sup 3} and 550 {micro}g/m{sup 3}) collected at the former CCC/USDA facility, as a result of a pre-CERCLIS site screening investigation (SSI) performed by TN & Associates, Inc., on behalf of the U.S. Environmental Protection Agency (EPA), Region VII (MoDNR 2001). In June 2001, the Missouri Department of Natural Resources (MoDNR) conducted further sampling of the soils and groundwater at the former CCC/USDA facility as part of a preliminary assessment/site inspection (PA/SI). The MoDNR confirmed the presence of carbon tetrachloride (at a maximum identified concentration of 2,810 {micro}g/kg) and chloroform (maximum 82 {micro}g/kg) in the soils and also detected carbon tetrachloride and chloroform (42.2 {micro}g/L and 58.4 {micro}g/L, respectively) in a groundwater sample collected at the former facility (MoDNR 2001). The carbon tetrachloride levels identified in the soils and groundwater are above the default target level (DTL) values established by the MoDNR for this contaminant in soils of all types (79.6 {micro}g/kg) and in groundwater (5.0 {micro}g/L), as outlined in Missouri Risk-Based Corrective Action (MRBCA): Departmental Technical Guidance (MoDNR 2006a). The corresponding MRBCA DTL values for chloroform are 76.6 {micro}g/kg in soils of all types and 80 {micro}g/L in groundwater. Because the observed contamination at Montgomery City might be linked to the past use of carbon tetrachloride-based fumigants at its former grain storage facility, the CCC/USDA will conduct investigations to (1) characterize the source(s), extent, and factors controlling the possible subsurface distribution and movement of carbon tetrachloride at the Montgomery City site and (2) evaluate the health and environmental threats potentially represented by the contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigations at Montgomery City will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Montgomery City will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Montgomery City investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Montgomery City site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne has issued a Provisional Master Work Plan (PMWP; Argonne 2007) that has been reviewed and approved by the MoDNR for current use. The PMWP (Argonne 2007) provides detailed information and guidance on the investigative technologies, analytical methodologies, qua

  17. Plutonium Vulnerability Management Plan

    SciTech Connect (OSTI)

    NONE

    1995-03-01T23:59:59.000Z

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  18. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    SciTech Connect (OSTI)

    R. P. Wells

    2006-11-14T23:59:59.000Z

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

  19. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    SciTech Connect (OSTI)

    R. P. Wells

    2006-09-19T23:59:59.000Z

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  20. Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    SAIC

    2011-04-01T23:59:59.000Z

    The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

  1. Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland

    SciTech Connect (OSTI)

    Benioff, P.; Biang, C.; Haffenden, R.; Goyette, M.; Martino, L.; Patton, T.; Yuen, C.

    1995-05-01T23:59:59.000Z

    The purpose of the feasibility study is to gather sufficient information to develop and evaluate alternative remedial actions to address contamination at J-Field in compliance with the NCP, CERCLA, and SARA. This FS Work Plan summarizes existing environmental data for each AOC and outlines the tasks to be performed to evaluate and select remedial technologies. The tasks to be performed will include (1) developing remedial action objectives and identifying response actions to meet these objectives; (2) identifying and screening remedial action technologies on the basis of effectiveness, implementability, and cost; (3) assembling technologies into comprehensive alternatives for J-Field; (4) evaluating, in detail, each alternative against the nine EPA evaluation criteria and comparing the alternatives to identify their respective strengths and weaknesses; and (5) selecting the preferred alternative for each operable unit.

  2. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    SciTech Connect (OSTI)

    Wells, J.L.

    1997-03-01T23:59:59.000Z

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  3. Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

    SciTech Connect (OSTI)

    Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

    1993-07-01T23:59:59.000Z

    This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

  4. Industrial Sites Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (including Record of Technical Change Nos. 1, 2, 3, and 4)

    SciTech Connect (OSTI)

    DOE/NV

    1998-12-18T23:59:59.000Z

    This Leachfield Corrective Action Units (CAUs) Work Plan has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the U.S. Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the U.S. Department of Defense (FFACO, 1996). Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. A work plan may be developed that can be referenced by leachfield Corrective Action Investigation Plans (CAIPs) to eliminate redundant CAU documentation. This Work Plan includes FFACO-required management, technical, quality assurance (QA), health and safety, public involvement, field sampling, and waste management documentation common to several CAUs with similar site histories and characteristics, namely the leachfield systems at the Nevada Test Site (NTS) and the Tonopah Test Range (TT R). For each CAU, a CAIP will be prepared to present detailed, site-specific information regarding contaminants of potential concern (COPCs), sampling locations, and investigation methods.

  5. December 4, 2008; HSS/Union Working Group Meeting on 2008 HSS/Union Topical Wrap Up - HSS/Union Training Workgroup Recommendations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197 This workDayton: ENERGY8 Deaerators3 SEAB

  6. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1993-05-01T23:59:59.000Z

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

  7. Technical change to the work plan for the remedial investigation of the Salmon Site, Lamar County, Mississippi: Sampling and analysis plan background soil and groundwater study

    SciTech Connect (OSTI)

    NONE

    1998-04-01T23:59:59.000Z

    The Salmon Site, formerly known as the Tatum Dome Test Site, is located in south-central Mississippi, southwest of the city of Hattiesburg, in Lamar County. Between 1964 and 1970, two nuclear and two non-nuclear gas explosions were conducted deep underground in the Tatum Salt Dome beneath the site. The tests were performed as part of the former US Atomic Energy Commission`s Vela Uniform Program which was conducted to improve the United States` capability to detect underground nuclear explosions. This document details technical changes to the existing work plan for the remedial investigation of the Salmon Site. A previously conducted Remedial Investigation for the Salmon Site involved the preparation of ecological and human health risk assessments. These risk assessments, which are incorporated into the Remedial Investigation Report, identified several constituents of potential concern (COPC) that could potentially have a negative impact on ecological and human health. These COPC are the primary risk drivers for the Salmon Site; they include arsenic and naturally occurring, gamma-emitting radionuclides. If it can be demonstrated that similar concentrations of these COPCs occur naturally in surrounding areas, they can be removed from consideration in the risk assessments. The purpose of this sampling effort is to collect enough data to prove that the COPCs are naturally occurring and are not a result of the explosives testing activities conducted at the site. This will be accomplished by collecting enough soil samples to have a statistically valid population that can be used to produce defensible comparisons that prove the concentrations identified on site are the same as the background concentrations in surrounding areas.

  8. Quality Work Plan Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev nextEnergyCanadianVersion) | DepartmentTraining1 |

  9. 6-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del(ANL-IN-03-032) -Less isNFebruaryOctober 2, AlgeriaQ1 Q2 Q3 U . S . D E 2 3 4

  10. Mon Valley work plan

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City, Arizona, DisposalFourth Five-Year38Report Second18295-1GWSHP 1.8

  11. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 224: DECON PAD AND SEPTIC SYSTEMS NEVADA TEST SITE, NEVADA

    SciTech Connect (OSTI)

    NONE

    2006-07-01T23:59:59.000Z

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 224 CADD.

  12. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    SciTech Connect (OSTI)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01T23:59:59.000Z

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task. These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.

  13. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-08-01T23:59:59.000Z

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

  14. Communication Standards and Recommendations

    E-Print Network [OSTI]

    Communication Standards and Recommendations Introduction & Purpose 3 Standards & Recommendations Communication 4 Training 10 Evaluation 11 PMO Workgroup Participation 12 Staffing 12 Communications-related Tracking Grantee Portal Standards and Recommendations 13

  15. DOE ASSESSMENT SEAB Recommendations Related to High Performance...

    Office of Environmental Management (EM)

    of 10 DOE ASSESSMENT SEAB Recommendations Related to High Performance Computing 1. Introduction The Department of Energy (DOE) is planning to develop and deliver capable exascale...

  16. Strategic plan for infrastructure optimization

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-05-27T23:59:59.000Z

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructure and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.

  17. Landscape architects, working along with scientists and consultants, combine science with other more qualitative planning and design

    E-Print Network [OSTI]

    Schladow, S. Geoffrey

    energy potentials can include incorporating passive solar, small-scale hydrologic, and wind. The latest more qualitative planning and design processes and methods. They design "artful" places for people of landscape design include the use of geology and soil science for sensitive land planning. Soil erosion

  18. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    SciTech Connect (OSTI)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01T23:59:59.000Z

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  19. Recommendation 222: Recommendations on Additional Off-site Groundwater...

    Office of Environmental Management (EM)

    2: Recommendations on Additional Off-site Groundwater Migration Studies Recommendation 222: Recommendations on Additional Off-site Groundwater Migration Studies ORSSAB recommends...

  20. Energy Organizational Planning

    SciTech Connect (OSTI)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17T23:59:59.000Z

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

  1. Recommendation in Social Networks

    E-Print Network [OSTI]

    Ester, Martin

    Recommendation in Social Networks Martin Ester Simon Fraser University Tutorial at RecSys 2013 October 12 , 2013 #12;Martin Ester: Recommendation in Social Networks, Tutorial at RecSys 2013 2 Outline · Introduction · Recommendation in social networks · Memory based approaches for item recommendation · Model

  2. Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan

    SciTech Connect (OSTI)

    D. E. Shanklin

    2006-06-01T23:59:59.000Z

    This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

  3. Nuclear Crisis Communications: The Plan Worked. A Critique of NRC Communications in the Fukushima Daiichi Reactor Crisis - 12073

    SciTech Connect (OSTI)

    Brenner, Eliot; Harrington, Holly; Schmidt, Rebecca [U.S. Nuclear Regulatory Commission, Rockville, MD 20852 (United States)

    2012-07-01T23:59:59.000Z

    'Call the AV-Photo folks and get someone in here to shoot b-roll. We'll never be able to accommodate the network cameras and the only way I can get this to the media is to produce it ourselves'. Eliot Brenner, Director NRC Office of Public Affairs, March 12, 2011. For the past four years we have been speaking to audiences at Waste Management about communications issues. Last year, though we were kept from attending because of the federal budget crisis, our surrogates described to you the lessons the nuclear industry should draw from the BP Gulf oil spill crisis. Those remarks were delivered 11 days before the Fukushima Daiichi tragedy became the nuclear landmark of a generation - an industry changing event with worldwide ramifications, both in science and regulation and in communications. Eliot Brenner cut his teeth on crisis communication in the aviation industry where tragedy unfolds rapidly. He has been a speech-writer to three cabinet secretaries, spokesman for the Federal Aviation Administration and now spokesman for the Nuclear Regulatory Commission since 2004. Holly Harrington manages the NRC crisis response program and has 26 years federal public affairs experience, including eight years at the Federal Emergency Management Agency. Her crisis experience includes the 1989 Loma Prieta earthquake, numerous hurricanes and floods, Sept 11, and, now Fukushima Daiichi. Rebecca Schmidt is a veteran government relations professional whose decades in Washington include service with the House Armed Services Committee, the House Budget Committee and the Secretary of Defense. Collectively, the Offices of Public Affairs and Congressional Affairs conducted the largest outreach for the agency since Three Mile Island. We worked with the basic rule, described to Waste Management last year just 11 days before Fukushima - communicate early, often and clearly. The response - while not without its problems and lessons - went as smoothly as a chaotic event like Fukushima could go. That was due in large measure to the fact that the NRC has a well-tested system of responding to nuclear emergencies, and we followed our plan. (authors)

  4. Systematic Approach for Decommissioning Planning and Estimating

    SciTech Connect (OSTI)

    Dam, A. S.

    2002-02-26T23:59:59.000Z

    Nuclear facility decommissioning, satisfactorily completed at the lowest cost, relies on a systematic approach to the planning, estimating, and documenting the work. High quality information is needed to properly perform the planning and estimating. A systematic approach to collecting and maintaining the needed information is recommended using a knowledgebase system for information management. A systematic approach is also recommended to develop the decommissioning plan, cost estimate and schedule. A probabilistic project cost and schedule risk analysis is included as part of the planning process. The entire effort is performed by a experienced team of decommissioning planners, cost estimators, schedulers, and facility knowledgeable owner representatives. The plant data, work plans, cost and schedule are entered into a knowledgebase. This systematic approach has been used successfully for decommissioning planning and cost estimating for a commercial nuclear power plant. Elements of this approach have been used for numerous cost estimates and estimate reviews. The plan and estimate in the knowledgebase should be a living document, updated periodically, to support decommissioning fund provisioning, with the plan ready for use when the need arises.

  5. Work plan for monitor well installation water and sediment sample collection aquifer testing and topographic surveying at the Riverton, Wyoming, UMTRA Project Site

    SciTech Connect (OSTI)

    NONE

    1995-06-01T23:59:59.000Z

    Investigations conducted during preparation of the site observational work plan (SOWP) at the Uranium Mill Tailings Remedial Action (UMTRA) Project site support a proposed natural flushing ground water compliance strategy, with institutional controls. However, additional site-specific data are needed to reduce uncertainties in order to confirm the applicability and feasibility of this proposed compliance strategy option. This proposed strategy will be analyzed in the site-specific environmental assessment. The purpose of this work plan is to summarize the data collection objectives to fill those data needs, describe the data collection activities that will be undertaken to meet those objectives, and elaborate on the data quality objectives which define the procedures that will be followed to ensure that the quality of these data meet UMTRA Project needs.

  6. Safer Work Plan for CAUs 452, 454, 456, and 464 Closure of Historical UST Release Sites Nevada Test Site

    SciTech Connect (OSTI)

    Jerry Bonn

    1997-08-01T23:59:59.000Z

    This plan addresses characterization and closure of nine underground storage tank petroleum hydrocarbon release sites. The sites are located at the Nevada Test Site in Areas 2, 9, 12, 23, and 25. The underground storage tanks associated with the release sites and addressed by this plan were closed between 1990 and 1996 by the U. S. Department of Energy, Nevada Operations Office. One underground storage tank was closed in place (23-111-1) while the remaining eight were closed by removal. Hydrocarbon releases were identified at each of the sites based upon laboratory analytical data samples collected below the tank bottoms. The objective of this plan is to provide a method for implementing characterization and closure of historical underground storage tank hydrocarbon release sites.

  7. Recommendations: Draft Annual Plan | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - TProcuringDepartmentDepartment ofon U. S. Grid

  8. Recommendations: 2007 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOE has preparedURTAC

  9. Recommendations: 2008 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOE has

  10. Recommendations: 2009 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOE hasURTAC -

  11. Recommendations: 2010 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOE hasURTAC -URTAC -

  12. Recommendations: 2011 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOE hasURTAC -URTAC

  13. Recommendations: Draft Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOEURTAC -UDAC

  14. Environmental Recommendations for Transmission Planning | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOEHazel Crest,EnergySerranopolisEnviroMission Ltd JumpFundEnvironmental

  15. Hanford tanks initiative work plan -- subsurface characterization to support the closure-readiness demonstration for tank 241-AX-104

    SciTech Connect (OSTI)

    Barnett, D.B.

    1996-09-27T23:59:59.000Z

    This document presents a plan for subsurface investigation near 241-AX-104 Single-Shell tank. Objectives of the investigation are soil sampling and analyses (physical and chemical), local stratigraphic correlation, groundwater background characterization, and geophysical surveys. The primary purpose of the investigation is to supply physical and hydraulic properties for numerical modeling of vadose zone flow and transport.

  16. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section}7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  17. Final phase I report and phase II work plan : QuickSite{reg_sign} investigation, Centralia, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M. (Environmental Research)

    2003-03-01T23:59:59.000Z

    The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), formerly operated a grain storage facility approximately 1,100 ft north of Centralia (Figure 1.2). The CCC/USDA operated this facility from 1949 until 1971. None of the CCC/USDA structures remain. Two additional grain storage facilities currently exist in and near Centralia: the Nemaha County Co-op, approximately 4,000 ft south of the former CCC/USDA facility, and a private grain storage facility near the Don Morris residence, 3,500 ft north of the former CCC/USDA facility. Prior to 1986, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the grain storage industry to preserve grain. In April 1998, the Kansas Department of Health and Environment (KDHE) sampled the domestic well at the Don Morris residence near Centralia (Figure 1.2) as part of the CCC/USDA Private Well Sampling Program, which was initiated to determine whether carbon tetrachloride was present in domestic wells located near former CCC/USDA grain storage facilities in Kansas. Carbon tetrachloride was detected in the Morris well at 19.3 mg/L and confirmed at 25.4 mg/L, both concentrations above the maximum contaminant level (MCL) of 5 mg/L for carbon tetrachloride in drinking water. On the basis of the detection of carbon tetrachloride in the Morris well, the KDHE in August-September 1998 conducted preliminary investigations at the former CCC/USDA facility. For the details of previous investigations in the area and a summary of their findings, see the QuickSite{reg_sign} Phase I Work Plan for Centralia (Argonne 2002a). Because the KDHE found carbon tetrachloride at the former CCC/USDA facility at Centralia that might, in part, be linked to historical use of carbon tetrachloride-based grain fumigants at the facility, the CCC/USDA is conducting an environmental site investigation at Centralia. However, the KDHE established in 1998 that the probable groundwater flow direction at the former CCC/USDA facility is not toward the Morris well, and thus the former facility is not responsible for the carbon tetrachloride measured in that well. The town of Centralia and all residents near the former CCC/USDA facility currently obtain their water from Rural Water District No.3 (RWD 3). Therefore, these local residents are not drinking and using contaminated groundwater. The investigation at Centralia is being performed by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. At these facilities, Argonne is applying its QuickSite environmental site characterization methodology. QuickSite is Argonne's proprietary implementation system for the expedited site characterization (ESC) process. Argonne's Environmental Research Division developed the ESC process to optimize preremedial site characterization work at hazardous waste sites by obtaining and then applying a thorough understanding of a site's geology, hydrogeology, and hydrogeochemistry (e.g., Burton 1994). This approach is fundamental to successful site characterization because the geology and hydrogeology of a site largely govern the mobility and fate of contaminants there. Argonne's ESC process has been used successfully at a number of former CCC/USDA facilities in Kansas and Nebraska and has been adopted by the American Society for Testing and Materials (ASTM 1998) as standard practice for environmental site characterization. This report documents the findings of the Phase I activities at Centralia. Section 1 provides a brief history of the area and the QuickSite process, a summary of the geologic/hydrogeologic model, objectives of the Phase I investigation, and a brief description of the sections cont

  18. Facility stabilization project fiscal year 1997 multi-year work plan (MYWP) for WBS 7.1

    SciTech Connect (OSTI)

    Cartmell, D.B.

    1996-09-01T23:59:59.000Z

    This document contains the technical baseline, work breakdown structure, schedule baseline, cost baseline, and execution year for the facility stabilization project.

  19. Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    NONE

    1999-07-15T23:59:59.000Z

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.

  20. Executive function processes: inhibition, working memory, planning and attention in children and youth with Attention Deficit Hyperactivity Disorder

    E-Print Network [OSTI]

    Wolfe, Monica Eileen

    2006-04-12T23:59:59.000Z

    ). 8 Inhibition is frequently defined as withholding a prepotent response and that definition was used in this study. The definition of planning selected was defined by Culbertson & Zillmer (1998b); it ?involves the delineation, organization... (Zillmer & Spiers, 2001). The overlap in symptoms and similarity to ADHD initially led researchers and clinicians to associate frontal lobe dysfunction with ADHD. Frontal lobe deficits were reconceptualized as executive function deficits in children...

  1. Streamlined Approach for Environmental Restoration Work Plan for Corrective Action Unit 329: Area 22 Desert Rock Airstrip Fuel Spill, Nevada Test Site, Nevada, Draft of Rev. 0

    SciTech Connect (OSTI)

    U.S. Department of Energy, Nevada Operations Office

    1999-09-28T23:59:59.000Z

    This plan was prepared as a characterization and closure report for Corrective Action Unit (CAU) 329: Area 22, Desert Rock Airstrip (DRA) Fuel Spill identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site, consists of one Corrective Action Site (CAS), 22-44-01, which encompasses an area contaminated by three recorded spills from a 25,000-gallon underground fuel storage tank. The tank was installed in 1980 and was imbedded in sand and gravel approximately 16 feet below the ground surface. Historically, the DRA consisted of a single runway, several portable buildings, two underground storage tanks containing aviation jet fuel, and plumbing to several refueling areas on the ramp. The constituents of potential concern from the spill were total petroleum hydrocarbons as gasoline or JP-4. This provides the methodology for sampling contaminated soil-vapor and soil to determine what activities, if any, are required for closure of this si te. In addition, there is sufficient process knowledge of the tank's historical use to recommend closure of CAU 329 using the Streamlined Approach for Environmental Restoration (SAFER) process. This process combines elements of the Data Quality Objectives process and the observational approach to help plan and conduct corrective actions. The study concluded that the spill is localized; therefore, it is very unlikely that the underground water supply has been or will be affected by these spills. In addition, there were high levels of carbon dioxide detected above the release which indicate that the spill is currently in the process of undergoing biological degradation and is not migrating. This CAU has been approved by the Nevada Division of Environmental Protection (NDEP) to be moved into Appendix III of the FFACO. Closure is expected to be in-place with administrative controls and soil-vapor sampling. A closure report will be prepared and submitted to NDEP for review and approval upo n completion of the field activities.

  2. Planning an Empirical Experiment To Evaluate The Effects Of Pair Work On The Design Phase Of The Software Lifecycle

    E-Print Network [OSTI]

    New South Wales, University of

    on the process and products of the design phase of the software development lifecycle. However, literature revealed that the product and process of pair programming work in the software development lifecycle have Of The Software Lifecycle Hiyam Al-Kilidar1 , Ross Jeffery1 , Aybuke Aurum2 , Cat Kutay1 1 School of Computer

  3. Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    This Remedial Investigation (RI) Work Plan specifically addresses Chestnut Ridge Operable Unit 1, (OU1) which consists of the Chestnut Ridge Security Pits (CRSP). The CRSP are located {approximately}800 ft southeast of the central portion of the Y-12 Plant atop Chestnut Ridge, which is bounded to the northwest by Bear Creek Valley and to the southeast by Bethel Valley. Operated from 1973 to 1988, the CRSP consisted of a series of trenches used for the disposal of classified hazardous and nonhazardous waste materials. Disposal of hazardous waste materials was discontinued in December 1984, while nonhazardous waste disposal ended on November 8, 1988. An RI is being conducted at this site in response to CERCLA regulations. The overall objectives of the RI are to collect data necessary to evaluate the nature and extent of contaminants of concern (COC), support an ecological risk assessment (ERA) and a human health risk assessment (HHRA), support the evaluation of remedial alternatives, and ultimately develop a Record of Decision for the site. The purpose of this Work Plan is to outline RI activities necessary to define the nature and extent of suspected contaminants at Chestnut Ridge OU1. Potential migration pathways also will be investigated. Data collected during the RI will be used to evaluate the overall risk posed to human health and the environment by OU1.

  4. NSPWG-recommended safety requirements and guidelines for SEI nuclear propulsion

    SciTech Connect (OSTI)

    Marshall, A.C.; Sawyer, J.C. Jr.; Bari, R.A.; Brown, N.W.; Cullingford, H.S.; Hardy, A.C.; Lee, J.H.; Mcculloch, W.H.; Niederauer, G.F.; Remp, K. (Sandia National Laboratories, Albuquerque, NM (United States) NASA, Washington (United States) Brookhaven National Laboratory, Upton, NY (United States) General Electric Co., San Jose, CA (United States) NASA, Johnson Space Center, Houston, Tn (United States) L

    1992-07-01T23:59:59.000Z

    An interagency Nuclear Safety Policy Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program to facilitate the implementation of mission planning and conceptual design studies. The NSPWG developed a top-level policy to provide the guiding principles for the development and implementation of the nuclear propulsion safety program and the development of safety functional requirements. In addition, the NSPWG reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. Safety requirements were developed for reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, and safeguards. Guidelines were recommended for risk/reliability, operational safety, flight trajectory and mission abort, space debris and meteoroids, and ground test safety. In this paper the specific requirements and guidelines will be discussed. 9 refs.

  5. NSPWG-recommended safety requirements and guidelines for SEI nuclear propulsion

    SciTech Connect (OSTI)

    Marshall, A.C.; Lee, J.H.; McCulloch, W.H. (Sandia National Labs., Albuquerque, NM (United States)); Sawyer, J.C. Jr. (National Aeronautics and Space Administration, Washington, DC (United States)); Bari, R.A. (Brookhaven National Lab., Upton, NY (United States)); Brown, N.W. (General Electric Co., San Jose, CA (United States)); Cullingford, H.S.; Hardy, A.C. (National Aeronautics and Space Administ

    1992-01-01T23:59:59.000Z

    An Interagency Nuclear Safety Policy Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program to facilitate the implementation of mission planning and conceptual design studies. The NSPWG developed a top- level policy to provide the guiding principles for the development and implementation of the nuclear propulsion safety program and the development of Safety Functional Requirements. In addition the NSPWG reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. Safety requirements were developed for reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, and safeguards. Guidelines were recommended for risk/reliability, operational safety, flight trajectory and mission abort, space debris and meteoroids, and ground test safety. In this paper the specific requirements and guidelines will be discussed.

  6. NSPWG-recommended safety requirements and guidelines for SEI nuclear propulsion

    SciTech Connect (OSTI)

    Marshall, A.C.; Lee, J.H.; McCulloch, W.H. [Sandia National Labs., Albuquerque, NM (United States); Sawyer, J.C. Jr. [National Aeronautics and Space Administration, Washington, DC (United States); Bari, R.A. [Brookhaven National Lab., Upton, NY (United States); Brown, N.W. [General Electric Co., San Jose, CA (United States); Cullingford, H.S.; Hardy, A.C. [National Aeronautics and Space Administration, Houston, TX (United States). Lyndon B. Johnson Space Center; Niederauer, G.F. [Los Alamos National Lab., NM (United States); Remp, K. [National Aeronautics and Space Administration, Cleveland, OH (United States). Lewis Research Center; Rice, J.W. [Idaho National Engineering Lab., Idaho Falls, ID (United States); Sholtis, J.A. [Department of the Air Force, Kirtland AFB, NM (United States)

    1992-09-01T23:59:59.000Z

    An Interagency Nuclear Safety Policy Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program to facilitate the implementation of mission planning and conceptual design studies. The NSPWG developed a top- level policy to provide the guiding principles for the development and implementation of the nuclear propulsion safety program and the development of Safety Functional Requirements. In addition the NSPWG reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. Safety requirements were developed for reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, and safeguards. Guidelines were recommended for risk/reliability, operational safety, flight trajectory and mission abort, space debris and meteoroids, and ground test safety. In this paper the specific requirements and guidelines will be discussed.

  7. Information basis for developing comprehensive waste management system-US-Japan joint nuclear energy action plan waste management working group phase I report.

    SciTech Connect (OSTI)

    Nutt, M.; Nuclear Engineering Division

    2010-05-25T23:59:59.000Z

    The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of the Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors to consider in repository design and optimization were then discussed. Japan is considering various alternatives and options for the geologic disposal facility and the framework for future analysis of repository concepts was discussed. Regarding the advanced waste and storage form development, waste form technologies developed in both countries were surveyed and compared. Potential collaboration areas and activities were next identified. Disposal system optimization processes and techniques were reviewed, and factors to consider in future repository design optimization activities were also discussed. Then the potential collaboration areas and activities related to the optimization problem were extracted.

  8. Lakeway Comprehensive Plan

    E-Print Network [OSTI]

    1999-01-01T23:59:59.000Z

    Two courses worked with community members at several public meetings to vision a future for Lakeway. With that and city assessments, city growth projections and recommendations were made....

  9. Hygiene Plan ENVIRONMENTAL

    E-Print Network [OSTI]

    Firestone, Jeremy

    Chemical Hygiene Plan ENVIRONMENTAL HEALTH & SAFETY #12;University Of Delaware Chemical Hygiene/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10106 · National Research Council Recommendations Concerning Chemical Hygiene in Laboratories (Non

  10. Agencies Approve Bacteria TMDL Task Force Recommendations 

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    tx H2O | pg. 10 In June 2007 the Texas Commission onEnvironmental Quality (TCEQ) and the TexasState Soil and Water Conservation Board (TSSW- CB) approved the recommendations of the Bacteria Total Maximum Daily Load (TMDL) Task Force and asked... their agencies to update their TMDL guidance documents to reflect these recommendations. They also authorized establishing a multi-agency bacteria TMDL work group to examine the research and development needs identified in the task force report. Both TCEQ...

  11. Proactive Planning

    E-Print Network [OSTI]

    Wythe, Kathy

    2008-01-01T23:59:59.000Z

    tx H2O | pg. 20 Landowners and agricultural producers in the Cedar Creek watershed are working with agency representatives and gov- ernment leaders on a proactive plan to help reduce pollution flowing into Cedar Creek Reservoir. The 34...-county watershed have an opportunity to voice their opinions and help draft the watershed protection plan for the reservoir. The plan, which will outline ways to reduce pollution and improve water quality, is an outgrowth of years of water quality monitoring...

  12. Remedial investigation work plan for Chestnut Ridge Operable Unit 4 (Rogers Quarry/Lower McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    The Oak Ridge Y-12 Plant includes - 800 acres near the northeast comer of the reservation and adjacent to the city of Oak Ridge (Fig. 1-1). The plant is a manufacturing and developmental engineering facility that produced components for various nuclear weapons systems and provides engineering support to other Energy Systems facilities. More than 200 contaminated sites have been identified at the Y-12 Plant that resulted from past waste management practices. Many of the sites have operable units (OUs) based on priority and on investigative and remediation requirements. This Remedial Investigation RI work plan specifically addresses Chestnut Ridge OU 4. Chestnut Ridge OU 4 consists of Rogers Quarry and Lower McCoy Branch (MCB). Rogers Quarry, which is also known as Old Rogers Quarry or Bethel Valley Quarry was used for quarrying from the late 1940s or early 1950s until about 1960. Since that time, the quarry has been used for disposal of coal ash and materials from Y-12 production operations, including classified materials. Disposal of coal ash ended in July 1993. An RI is being conducted at this site in response to CERCLA regulations. The overall objectives of the RI are to collect data necessary to evaluate the nature and extent of contaminants of concern, support an Ecological Risk Assessment and a Human Health Risk Assessment, support the evaluation of remedial alternatives, and ultimately develop a Record of Decision for the site. The purpose of this work plan is to outline RI activities necessary to define the nature and extent of suspected contaminants at Chestnut Ridge OU 4. Potential migration pathways also will be investigated. Data collected during the RI will be used to evaluate the risk posed to human health and the environment by OU 4.

  13. Final work plan : investigation of potential contamination at the former CCC/USDA grain storage facility in Hanover, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2008-11-19T23:59:59.000Z

    The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility at the northeastern edge of the city of Hanover, Kansas, from 1950 until the early 1970s. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In February 1998, trace to low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5.0 {micro}g/L) were detected in two private wells near the former grain storage facility at Hanover, as part of a statewide USDA private well sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. In April 2007, the CCC/USDA collected near-surface soil samples at 1.8-2 ft BGL (below ground level) at 61 locations across the former CCC/USDA facility. All soil samples were analyzed by the rigorous gas chromatograph-mass spectrometer analytical method (purge-and-trap method). No contamination was found in soil samples above the reporting limit of 10 {micro}g/kg. In July 2007, the CCC/USDA sampled indoor air at nine residences on or adjacent to its former facility to address the residents concerns regarding vapor intrusion. Low levels of carbon tetrachloride were detected at four of the nine homes. Because carbon tetrachloride found in private wells and indoor air at the site might be linked to historical use of fumigants containing carbon tetrachloride at its former grain storage facility, the CCC/USDA is proposing to conduct an investigation to determine the source and extent of the carbon tetrachloride contamination associated with the former facility. This investigation will be conducted in accordance with the intergovernmental agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. The investigation at Hanover will be performed, on behalf of the CCC/USDA, by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Seven technical objectives have been proposed for the Hanover investigation. They are as follows: (1) Identify the sources and extent of soil contamination beneath the former CCC/USDA facility; (2) Characterize groundwater contamination beneath the former CCC/USDA facility; (3) Determine groundwater flow patterns; (4) Define the vertical and lateral extent of the groundwater plume outside the former CCC/USDA facility; (5) Evaluate the aquifer and monitor the groundwater system; (6) Identify any other potential sources of contamination that are not related to activities of the CCC/USDA; and (7) Determine whether there is a vapor intrusion problem at the site attributable to the former CCC/USDA facility. The technical objectives will be accomplished in a phased approached. Data collected during each phase will be evaluated to determine whether the subsequent phase is necessary. The KDHE project manager and the CCC/USDA will be contacted during each phase and kept apprised of the results. Whether implementation of each phase of work is necessary will be discussed and mutually agreed upon by the CCC/USDA and KDHE project managers.

  14. Staff summary of Issues & Recommendations *Preliminary draft, please refer to full recommendations for complete review

    E-Print Network [OSTI]

    recommendations for complete review 10/29/2013 10:08 AM 2009 Fish and Wildlife Program Section Section VI Mainstem (page 34) I. Summary With regard to the Fish and Wildlife Program's Mainstem Plan, a number of federal and other fish in and below the reservoirs, adjustments they believe are consistent with the flexibility

  15. Introduction Recommendations Environment Impacts

    E-Print Network [OSTI]

    Iglesia, Enrique

    (reduce costs). Recycling · Few solar cell companies choose to offer recycling programs. · Limiting. Decommission and Recycle 2. Extended use past recommended decommission age Eliminate solar cell disposal additional years beyond expected life-span. 1839 1954 2000 2020 Reallocate government subsidies for solar

  16. Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1990-08-01T23:59:59.000Z

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  17. Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999

    SciTech Connect (OSTI)

    Not Available

    1990-08-01T23:59:59.000Z

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  18. Work plan for the remedial investigation/feasibility study-environmental assessment for the quarry residuals operable unit at the Weldon Spring Site

    SciTech Connect (OSTI)

    Not Available

    1994-01-01T23:59:59.000Z

    The US Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. The Weldon Spring site consists of two noncontiguous areas -- the chemical plant area, which includes four raffinate pits, and the quarry. Cleanup activities at the Weldon Spring site are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, incorporating the values of the National Environmental Policy Act (NEPA). The contents of the documents prepared for the project are not intended to represent a statement regarding the legal applicability of NEPA to remedial actions conducted under CERCLA. In accordance with the integrated CERCLA/NEPA approach, a remedial investigation/feasibility study-environmental assessment (RI/FS-EA) is being conducted to evaluate conditions and potential responses for the quarry residuals operable unit (QROU). This operable unit consists of the following areas and/or media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and bulk waste; underlying groundwater; and other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough. This work plan identifies the activities within the RI/FS-EA process that are being proposed to address contamination remaining at the quarry area.

  19. Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

  20. Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1993-07-01T23:59:59.000Z

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODs) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regimes, which are labeled as integrator OUs. This remedial investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the feasibility study to evaluate all probable or likely alternatives.

  1. Recommendations for reducing ambiguity in written procedures.

    SciTech Connect (OSTI)

    Matzen, Laura E.

    2009-11-01T23:59:59.000Z

    Previous studies in the nuclear weapons complex have shown that ambiguous work instructions (WIs) and operating procedures (OPs) can lead to human error, which is a major cause for concern. This report outlines some of the sources of ambiguity in written English and describes three recommendations for reducing ambiguity in WIs and OPs. The recommendations are based on commonly used research techniques in the fields of linguistics and cognitive psychology. The first recommendation is to gather empirical data that can be used to improve the recommended word lists that are provided to technical writers. The second recommendation is to have a review in which new WIs and OPs and checked for ambiguities and clarity. The third recommendation is to use self-paced reading time studies to identify any remaining ambiguities before the new WIs and OPs are put into use. If these three steps are followed for new WIs and OPs, the likelihood of human errors related to ambiguity could be greatly reduced.

  2. Standard Format and Content for Emergency Plans

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21T23:59:59.000Z

    This volume addresses recommended emergency plan format and content for Operational Emergency Base Programs and Operational Emergency Hazardous Material Programs. Canceled by DOE G 151.1-3.

  3. McKinney Sustainability Plan 

    E-Print Network [OSTI]

    Smith, J.

    2011-01-01T23:59:59.000Z

    CATEE Conference: Planning for Sustainability McKinney?s Draft Community Sustainability Plan: Shaping Our Sustainable Future Julie Smith Office of Environmental Stewardship November 8, 2011 Sustainability Planning ? Why bother? ? Who has... aspect of sustainability ? Created the Green Advisory Committee (GAC) ? November 2008: Green Sustainability Initiative Report ? Recommended forming a comprehensive, sustainability program to coordinate the sustainability agenda for the city...

  4. Tracking Grantee Portal Standards and Recommendations Standards and Recommendations Table

    E-Print Network [OSTI]

    Tracking Grantee Portal Standards and Recommendations April 2009 Standards and Recommendations Table Tracking Network Standards Provide both public and secure grantee portals. Provide a link on a grantee's portal. Organize contents of pages to facilitate the identification of detailed information

  5. September 2009 Recommendation Summary

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2Uranium Transfer toSensor Technologies for a Smart Recommendation 2009-06: EM

  6. Work with Biological Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal...

  7. Climate Action Plans and Long-Range Transportation

    E-Print Network [OSTI]

    Bertini, Robert L.

    Climate Action Plans and Long-Range Transportation Plans in the Pacific Northwest: A Review Climate Change and Impacts Mitigation versus Adaptation Impacts of Climate Change: Nation & the Pacific Northwest Climate Change Planning Efforts Transportation Sector Response - Survey Recommendations Continued

  8. Management Plan Supplement Yakima Subbasin Plan

    E-Print Network [OSTI]

    #12;Management Plan Supplement Yakima Subbasin Plan November 26, 2004 Prepared for the Presented's subbasin planning process is iterative and designed within an adaptive management framework. Management is comprised of elected officials from local governments throughout the subbasin, and meets regularly to work

  9. Management Plan Management Plan

    E-Print Network [OSTI]

    Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have communities" J. Lichatowich et al. 1998. A Conceptual Foundation for the Management of Native Salmonids

  10. Renewable generation and storage project industry and laboratory recommendations

    SciTech Connect (OSTI)

    Clark, N.H.; Butler, P.C.; Cameron, C.P.

    1998-03-01T23:59:59.000Z

    The US Department of Energy Office of Utility Technologies is planning a series of related projects that will seek to improve the integration of renewable energy generation with energy storage in modular systems. The Energy Storage Systems Program and the Photovoltaics Program at Sandia National Laboratories conducted meetings to solicit industry guidance and to create a set of recommendations for the proposed projects. Five possible projects were identified and a three pronged approach was recommended. The recommended approach includes preparing a storage technology handbook, analyzing data from currently fielded systems, and defining future user needs and application requirements.

  11. SYNTHETIC SLING FAILURE - EVALUATIONS & RECOMMENDATIONS

    SciTech Connect (OSTI)

    MACKEY TC; HENDERSON CS

    2009-10-26T23:59:59.000Z

    The information and evaluations provided in this report were compiled to address the recurring problem of synthetic sling failure. As safety is the number one priority in all work aspects, a solution must be devised to prevent accidents from occurring. A total of thirteen cases regarding synthetic sling failure were evaluated in order to determine their causes, effects, and preventative measures. From the collected data, it was found that all cases in which the synthetic sling contacted the edge of its load resulted in sling failure. It is required that adequate synthetic sling protection devices be used to protect slings in any lift where the sling comes in direct contact with the edge or corner of its load. However, there are no consensus codes or standards stating the type, material, or purpose of the type of protective device used to protect the sling from being cut. Numerous industry standards and codes provide vague descriptions on how to protect synthetic slings. Without a clear, concise statement of how to protect synthetic slings, it is common for inadequate materials and sling protection devices to be used in an attempt to meet the intent of these requirements. The use of an inadequate sling protection device is the main cause of synthetic sling failure in all researched cases. Commercial sling protection devices come in many shapes and sizes, and have a variety of names, as well as advertised uses. 'Abrasion pads' and 'wear protectors' are two different names for products with the same intended purpose. There is no distinguishable way to determine the extent of sling protection which these devices will provide, or what specific scenarios they are made for. This creates room for error in a field where error is unacceptable. This report provides a recommended action for hoisting and rigging activities which require synthetic slings to contact a load, as well as recommended changes to industry standards which will benefit overall industry safety.

  12. Final work plan : phase II investigation of potential contamination at the former CCC/USDA grain storage facility in Savannah, Missouri.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2010-08-16T23:59:59.000Z

    From approximately 1949 until 1970, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility on federally owned property approximately 0.25 mi northwest of Savannah, Missouri (Figure 1.1). During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In November 1998, carbon tetrachloride was detected in a private well (Morgan) roughly 50 ft south of the former CCC/USDA facility, as a result of statewide screening of private wells near former CCC/USDA facilities, conducted in Missouri by the U.S. Environmental Protection Agency (EPA 1999). The 1998 and subsequent investigations by the EPA and the Missouri Department of Natural Resources (MoDNR) confirmed the presence of carbon tetrachloride in the Morgan well, as well as in a second well (on property currently occupied by the Missouri Department of Transportation [MoDOT]) described as being approximately 400 ft east of the former CCC/USDA facility. The identified concentrations in these two wells were above the EPA maximum contaminant level (MCL) and the Missouri risk-based corrective action default target level (MRBCA DTL) values of 5.0 {micro}g/L for carbon tetrachloride in water used for domestic purposes (EPA 1999; MoDNR 2000a,b, 2006). Because the observed contamination in the Morgan and MoDOT wells might be linked to the past use of carbon tetrachloride-based fumigants at its former grain storage facility, the CCC/USDA is conducting an investigation to (1) characterize the source(s), extent, and factors controlling the subsurface distribution and movement of carbon tetrachloride at Savannah and (2) evaluate the potential risks to human health, public welfare, and the environment posed by the contamination. This work is being performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The site characterization at Savannah is being conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. The investigation at Savannah is being conducted in phases. This approach is being used by the CCC/USDA and Argonne, with the approval of the MoDNR, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. Phase I of the Savannah program was conducted in October-November 2007 and January 2008 (Argonne 2007a, 2008). This site-specific Work Plan provides a brief summary of the Phase I findings and the results of groundwater level monitoring that has been ongoing since completion of the Phase I study and also outlines technical objectives, investigation tasks, and investigation methods for Phase II of the site characterization at Savannah.

  13. Andrew Mahlstadt Literature and the Mountains recommended reading

    E-Print Network [OSTI]

    Wisconsin at Madison, University of

    Andrew Mahlstadt Literature and the Mountains ­ recommended reading Critical works on mountains", in The Adventures of Ghanada (Premendra Mitra) A River Runs through it (Norman Maclean) "Brokeback Mountain" (Annie

  14. Evaluation and recommendations for reduction of a silica dust exposure

    E-Print Network [OSTI]

    Gruben, Raymond L

    2000-01-01T23:59:59.000Z

    exposure. Measurements of static pressure and linear flow rate were used to analyze the ventilation system and show why it was not working. Changes are recommended to improve the ventilation system performance and thereby to improve workers' protection....

  15. The Melvyl Recommender Project: Developing Library Recommendation Services

    E-Print Network [OSTI]

    Whitney, Colleen; Schiff, Lisa R

    2006-01-01T23:59:59.000Z

    recommender system for digital library. In Proceedings of CS Joint Conference on Digital Libraries (Portland, Oregon,Joint Conference on Digital Libraries (Chapel Hill, NC, USA,

  16. DOE Challenge Home Recommended Quality Management Provisions...

    Broader source: Energy.gov (indexed) [DOE]

    Recommended Quality Management Provisions DOE Challenge Home Recommended Quality Management Provisions DOE Challenge Home Recommended Quality Management Provisions. qm6-14-13.pdf...

  17. ESnet Program Plan 1994

    SciTech Connect (OSTI)

    Merola, S.

    1994-11-01T23:59:59.000Z

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  18. Reprinted from Working Notes of the AAAI Spring Symposium on DecisionTheoretic Planning, March, 1994, Steve Hanks, Stuart Russell, and Michael Wellman, editors.

    E-Print Network [OSTI]

    Doyle, Jon

    Technology Square Cambridge, MA 02139 doyle@lcs.mit.edu Michael P. Wellman Artificial Intelligence Laboratory in automated reasoning sys­ tems. Our semantics lifts comparisons of indi­ viduals to comparisons of classes­ pletely and directly encode it in the planning system, as the domain of outcomes is combinatorially large

  19. Reprinted from Working Notes of the AAAI Spring Symposium on Decision-Theoretic Planning, March, 1994, Steve Hanks, Stuart Russell, and Michael Wellman, editors.

    E-Print Network [OSTI]

    Doyle, Jon

    Technology Square Cambridge, MA 02139 doyle@lcs.mit.edu Michael P. Wellman Artificial Intelligence Laboratory in automated reasoning sys- tems. Our semantics lifts comparisons of indi- viduals to comparisons of classes and directly encode it in the planning system, as the domain of outcomes is combinatorially large or infinite

  20. Climate VISION: Private Sector Initiatives: Semiconductors: Work...

    Office of Scientific and Technical Information (OSTI)

    of EPA. The plan describes actions the industry intends to take to achieve its Climate VISION goal by 2010. Read the Semiconductor Industry Association Work Plan (PDF 94...

  1. University of Missouri-Columbia Transfer Recommendation Form

    E-Print Network [OSTI]

    Taylor, Jerry

    University of Missouri-Columbia Transfer Recommendation Form Complete this form if you to the International Center at the University of Missouri-Columbia. For instructions on SEVIS transfer, please go to permission for the information below to be released to the University of Missouri-Columbia. Do you plan

  2. Schedule optimization study implementation plan

    SciTech Connect (OSTI)

    Not Available

    1993-11-01T23:59:59.000Z

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

  3. QEP WORKING GROUP CHARGES Assessment Working Group

    E-Print Network [OSTI]

    Liu, Paul

    and a framework that details timelines, leadership, resource allocation, and an assessment plan that is clearlyQEP WORKING GROUP CHARGES Assessment Working Group The topic of the QEP should fit should be supported by a thorough understanding of the institutional context and by assessment data

  4. Liquid effluent/Hanford Environmental compliance FY 1995 Multi-Year Program Plan/Fiscal Year Work Plan, WBS 1.2.2.1 and 1.2.2.2

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This document details the program effort to eliminate the use of the soil column for liquid effluent treatment and to manage current and future liquid effluent streams at the Hanford Site, in a safe responsible cost effective and legally compliant mannger. This should be achieved through planning, public and stakeholder interaction, definition of requiremtns for generators, and provision of timely treatment, stroage, disposal capability, and waste minimization of waste streams.

  5. BEDES Strategic Working Group Recommendations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergyDepartmentWind Siting ArticlesAugust 2014BackgroundGlossaryBEDES

  6. Chevron Richmond Refinery Pipe Rupture and Fire Animation - Work...

    Broader source: Energy.gov (indexed) [DOE]

    Chevron Richmond Refinery Pipe Rupture and Fire Animation - Work Planning and Control is Not Chevron Richmond Refinery Pipe Rupture and Fire Animation - Work Planning and Control...

  7. Climate VISION: Private Sector Initiatives: Oil and Gas: Work...

    Office of Scientific and Technical Information (OSTI)

    Work Plans API has developed a work plan based on API's commitment letter and the Climate Challenge Program which addresses the overall elements of the Climate VISION program...

  8. Loosely Annotated Bibiolography: recommended by Applied Environmental Decision Analysis researchers (June-July 2011)

    E-Print Network [OSTI]

    Loosely Annotated Bibiolography: recommended by Applied Environmental Decision Analysis researchers to collapse. Risks and decisions for conservation and environmental management (Burgman and Possingham 2000) Population Viability Analysis (PVA) is a useful tool for conservation planning and population management

  9. SOIL TEST INTERPRETATIONS RECOMMENDATIONS HANDBOOK

    E-Print Network [OSTI]

    Noble, James S.

    1 SOIL TEST INTERPRETATIONS AND RECOMMENDATIONS HANDBOOK Originally written 1983 By Daryl D..................................................20 SOIL ACIDITY AND LIMESTONE...............................................27 EXCHANGEABLE MAGNESIUM No. Page No. I. Nitrogen rate adjustments based upon soil texture, organic matter, and time of major

  10. America's Power Plan: Siting - Finding a Home for Renewable Energy...

    Open Energy Info (EERE)

    planning and operations to take better advantage of existing infrastructure and reduce costs of integrating more renewable energy. This paper provides detailed recommendations for...

  11. RECOMMENDATION FORM One recommendation is required for full admission and scholarship consideration; additional recommendations are optional. Your

    E-Print Network [OSTI]

    ; additional recommendations are optional. Your recommendation(s) should come from individuals who can speak Comments (Optional) Please feel free to include here (or attach an additional sheet) any information

  12. Surveillance Guides - Work Control Process

    Broader source: Energy.gov (indexed) [DOE]

    established and is utilized to effectively plan, authorize, and execute the identified work for the facility or activity. Both workers and management demonstrate a commitment to...

  13. Recommendations for space reactor R&D tasks

    SciTech Connect (OSTI)

    Wiley, R.L. [5998 Camelback Lane, Columbia, Maryland 21045 (United States); Marshall, A.C. [Sandia National Laboratories, P.O. Box 5800, Albuquerque, New Mexico 87185 (United States)

    1996-03-01T23:59:59.000Z

    A rationale was developed to determine which technologies a space nuclear reactor technology base program should pursue based on the fact that budgets would be limited. A preliminary evaluation was conducted to identify key technical issues and to recommend a prioritized set of candidate research projects that could be undertaken as part of the Defense Nuclear Agency (DNA) program in the near term. The recommendations made have not been adopted formally by the DNA{close_quote}s Topaz International Program (TIP), but serve as inputs to the program planning process. {copyright} {ital 1996 American Institute of Physics.}

  14. Status Update on Action 2b: Revision of DOE G 226.1-2 with new Guidance for Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Strengthen guidance and formality associated with contractor implementation and Federal monitoring of activity-level WP&C. Develop a DOE Guide on Federal oversight and evaluation of the effectiveness of Activity-Level WP&C.

  15. Effective Strategies for Participating in Utility Planning |...

    Energy Savers [EERE]

    Strategies for Participating in Utility Planning Effective Strategies for Participating in Utility Planning Better Buildings Neighborhood Program Working with Utilities Peer...

  16. A Template for a Performance Assurance Plan

    Office of Environmental Management (EM)

    Template for a Performance Assurance Plan (draft) Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR November 5-6, 2014 Cape Canaveral. Florida Performance Assurance Plan...

  17. NASA/DOE/DOD nuclear propulsion technology planning: Summary of FY 1991 interagency panel results

    SciTech Connect (OSTI)

    Clark, J.S.; Wickenheiser, T.J.; Doherty, M.P.; Marshall, A.; Bhattacharryya, S.K.; Warren, J.

    1992-01-01T23:59:59.000Z

    Interagency (NASA/DOE/DOD) technical panels worked in 1991 to evaluate critical nuclear propulsion issues, compare nuclear propulsion concepts for a manned Mars mission on a consistent basis, and to continue planning a technology development project for the Space Exploration Initiative (SEI). Panels were formed to address mission analysis, nuclear facilities, safety policy, nuclear fuels and materials, nuclear electric propulsion technology, and nuclear thermal propulsion technology. A summary of the results and recommendations of the panels is presented.

  18. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 536: AREA 3 RELEASE SITE, NEVADA TEST SITE, NEVADA

    SciTech Connect (OSTI)

    NONE

    2005-09-01T23:59:59.000Z

    CAU 536 consists of CAS 03-44-02, Steam Jenny Discharge, located in Area 3 of the NTS. The site was characterized in 2004 according to the approved CAIP and the site characterization results are reported in the CAU 536 CADD. The purpose of this Corrective Action Plan (CAP) is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 536 CADD.

  19. Recommended Academic Plan for Turfgrass Science (TURF) Berks Campus

    E-Print Network [OSTI]

    Guiltinan, Mark

    to Plant Biology 3 Supporting Courses 6 ASM 307 Golf Course Irrigation and Drainage 3 Elective 3 Arts, GA, GH, and GS are codes used to identify General Education requirements. US and IL are codes used to designate courses that satisfy University United States/International Cultures requirements. W is the code

  20. Recommended Academic Plan for Turfgrass Science Major (TURF) University Park

    E-Print Network [OSTI]

    Guiltinan, Mark

    Elective 3 ASM 307 Golf Course Irrigation and Drainage 3 TURF 495 (Internship) 1 Total Credits: 15 Total are codes used to identify General Education requirements. US, IL, and US;IL are codes used to designate courses that satisfy University United States/International Cultures requirements. W is the code used

  1. Recommendations: Draft 2011 Section 999 Annual Plan | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO Overview OCHCO Overview OCHCODepartmentEnergy AprilEnvironmental

  2. Recommendations: Draft 2012 Annual Plan | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - TProcuringDepartmentDepartment ofon U. S. Grid Security2012

  3. EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of98-F, Western Systems Power Pool EA-98-F,EACourPrograms- June 6,

  4. Recommendations: Draft 2007 Section 999 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOE hasURTAC

  5. Recommendations: Draft 2008 Section 999 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOE hasURTAC8 Section

  6. Recommendations: Draft 2009 Section 999 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOE hasURTAC8 Section9

  7. Recommendations: Draft 2010 Section 999 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOE hasURTAC8

  8. Recommendations: Draft 2012 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOE

  9. Recommendations: Draft 2013 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOEURTAC -

  10. Recommendations: Draft 2013 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010In addition toDOEDepartment ofDOEURTAC -UDAC -

  11. EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015 Business42.1Energy |FinalEESS-7 to export electricCanada.Grid - June 6,- June

  12. Implementation Plan, 29 Recommendations of the Protective Force Career

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(Fact Sheet),Energy PetroleumEnergy Lube-oilDatabase for Light WaterOptions

  13. Recommendations: Draft 2012 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of ContaminationHubs+18, 2012 Qualified11DepartmentEnergy 16:10 Section 999

  14. STAFFREPORT Prepared for the Bioenergy Interagency Working Group

    E-Print Network [OSTI]

    STAFFREPORT Prepared for the Bioenergy Interagency Working Group: Air Resources Board 2010 2009 PROGRESS TO PLAN BIOENERGY ACTION PLAN FOR CALIFORNIA CALIFORNIA ENERGY COMMISSION #12, and et. al. 2010. 2009 Progress to Plan Bioenergy Action Plan for California. California Energy

  15. EM SSAB Recommendations & Letters | Department of Energy

    Office of Environmental Management (EM)

    and Letters - 2014-05 Included recommendations, letters, and other related materials. September 30, 2014 EM SSAB Recommendations and Letters - 2014-04 Included...

  16. Building America Expert Meeting: Recommendations for Applying...

    Energy Savers [EERE]

    Building America Expert Meeting: Recommendations for Applying Water Heaters in Combination Space and Domestic Water Heating Systems Building America Expert Meeting: Recommendations...

  17. Military Munitions Waste Working Group report

    SciTech Connect (OSTI)

    Not Available

    1993-11-30T23:59:59.000Z

    This report presents the findings of the Military Munitions Waste Working Group in its effort to achieve the goals directed under the Federal Advisory Committee to Develop On-Site Innovative Technologies (DOIT Committee) for environmental restoration and waste management. The Military Munitions Waste Working Group identified the following seven areas of concern associated with the ordnance (energetics) waste stream: unexploded ordnance; stockpiled; disposed -- at known locations, i.e., disposal pits; discharged -- impact areas, unknown disposal sites; contaminated media; chemical sureties/weapons; biological weapons; munitions production; depleted uranium; and rocket motor and fuel disposal (open burn/open detonation). Because of time constraints, the Military Munitions Waste Working Group has focused on unexploded ordnance and contaminated media with the understanding that remaining waste streams will be considered as time permits. Contents of this report are as follows: executive summary; introduction; Military Munitions Waste Working Group charter; description of priority waste stream problems; shortcomings of existing approaches, processes and technologies; innovative approaches, processes and technologies, work force planning, training, and education issues relative to technology development and cleanup; criteria used to identify and screen potential demonstration projects; list of potential candidate demonstration projects for the DOIT committee decision/recommendation and appendices.

  18. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-04-21T23:59:59.000Z

    To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. Cancels DOE O 412.1.

  19. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-04-21T23:59:59.000Z

    To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A.

  20. Final work plan: Expedited Site Characterization of the IES Industries, Inc., Site at Marshalltown, Iowa. Ames Expedited Site Characterization Project, Version 1.0

    SciTech Connect (OSTI)

    Not Available

    1994-04-04T23:59:59.000Z

    The overall goal of the Ames Laboratory Expedited Site Characterization (ESC) project is to evaluate and promote both innovative and state-of-the-practice site characterization and/or monitoring technologies. This will be accomplished by fielding both types of technologies together in the context of an expedited site characterization. The first site will be at a former manufactured gas plant (FMGP) in Marshalltown, Iowa. The project will field three areas of technology: geophysical, analytical, and data fusion. Geophysical technologies are designed to understand the subsurface geology to help predict fate and transport of the target contaminants. Analytical technologies/methods are designed to detect and quantify the target contaminants. Data fusion technology consists of software systems designed to rapidly integrate or fuse all site information into a conceptual site model that then becomes the decision making tool for the site team to plan subsequent sampling activity. Not all of the contaminants present can be located at the action level. Polynuclear aromatic hydrocarbons (PAHs) are the signature organics associated with the coal tar activities that took place at the site. As a result, PAHs were selected as the target compounds. Screening analytical instruments and nonintrusive geophysical techniques will be fielded to qualitatively map the spatial contaminant distribution. Soil gas surveys, immunoassay testing (IMA), innovative optical techniques, and passive organic sorbent sensors will be deployed along with the geophysical methods. Gas chromatography/mass spectrometry (GC/MS) instruments and a cone penetrometer system equipped with a laser-induced fluorescence (LIF) probe will quantitatively map the action level edges of the PAH plume(s). Samples will be taken both by the cone penetrometer test system (CPT) and the Geoprobe {reg_sign} sampler system.

  1. Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01T23:59:59.000Z

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  2. Documentation of a Model Action Plan to Deter Illicit Nuclear Trafficking

    SciTech Connect (OSTI)

    Smith, D; Kristo, M; Niemeyer, S; Dudder, G

    2006-07-28T23:59:59.000Z

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures.

  3. Documentation of a model action plan to deter illicit nuclear trafficking

    SciTech Connect (OSTI)

    Smith, D. K.; Kristo, M. J.; Niemeyer, S.; Dudder, Gordon B.

    2008-05-04T23:59:59.000Z

    Theft, illegal possession, smuggling, or attempted unathorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures.

  4. Nuclear Physics Neutrino PreTown Meeting: Summary and Recommendations

    E-Print Network [OSTI]

    W. C. Haxton; John Bahcall; A. Baha Balantekin; Stuart Freedman; Kevin Lesko; Hamish Robertson; Bob Lanou; George Fuller; Ken Lande; Tony Mezzacappa; Frank Avignone; Bill Louis; Petr Vogel; Todd Haines; John Wilkerson

    2000-11-08T23:59:59.000Z

    In preparation for the nuclear physics Long Range Plan exercise, a group of 104 neutrino physicists met in Seattle September 21-23 to discuss both the present state of the field and the new opportunities of the next decade. This report summarizes the conclusions of that meeting and presents its recommendations. Further information is available at the workshop's web site. This report will be further reviewed at the upcoming Oakland Town Meeting.

  5. RECOMMENDED SECURITY CONTROLS FOR FEDERAL

    E-Print Network [OSTI]

    May 2005 RECOMMENDED SECURITY CONTROLS FOR FEDERAL INFORMATION SYSTEMS: GUIDANCE FOR SELECTING COST-EFFECTIVE CONTROLS USING A RISK-BASED PROCESS Shirley Radack, Editor, Computer Security Division, Information Technology Laboratory National Institute of Standards and Technology Security controls are the management

  6. Performance expectation plan

    SciTech Connect (OSTI)

    Ray, P.E.

    1998-09-04T23:59:59.000Z

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  7. Approaches to N Recommendations in the

    E-Print Network [OSTI]

    Balser, Teri C.

    Bundy & Todd Andraski ­ Soil Science Scott Sturgul ­ NPM Program #12;N Recommendations Two prevailing

  8. IDC Integrated Master Plan.

    SciTech Connect (OSTI)

    Clifford, David J.; Harris, James M.

    2014-12-01T23:59:59.000Z

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  9. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-05-01T23:59:59.000Z

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

  10. A study of IMRT planning parameters on planning efficiency, delivery efficiency, and plan quality

    SciTech Connect (OSTI)

    Mittauer, Kathryn [Department of Radiation Oncology, College of Medicine, University of Florida, Gainesville, Florida 32603 and J. Crayton Pruitt Family Department of Biomedical Engineering, University of Florida, Gainesville, Florida 32611 (United States); Lu Bo; Yan Guanghua; Kahler, Darren; Amdur, Robert; Liu Chihray [Department of Radiation Oncology, College of Medicine, University of Florida, Gainesville, Florida 32603 (United States); Gopal, Arun [Department of Radiation Oncology, New York-Presbyterian Hospital, Columbia University, New York, New York 10032 (United States)

    2013-06-15T23:59:59.000Z

    Purpose: To improve planning and delivery efficiency of head and neck IMRT without compromising planning quality through the evaluation of inverse planning parameters.Methods: Eleven head and neck patients with pre-existing IMRT treatment plans were selected for this retrospective study. The Pinnacle treatment planning system (TPS) was used to compute new treatment plans for each patient by varying the individual or the combined parameters of dose/fluence grid resolution, minimum MU per segment, and minimum segment area. Forty-five plans per patient were generated with the following variations: 4 dose/fluence grid resolution plans, 12 minimum segment area plans, 9 minimum MU plans, and 20 combined minimum segment area/minimum MU plans. Each plan was evaluated and compared to others based on dose volume histograms (DVHs) (i.e., plan quality), planning time, and delivery time. To evaluate delivery efficiency, a model was developed that estimated the delivery time of a treatment plan, and validated through measurements on an Elekta Synergy linear accelerator. Results: The uncertainty (i.e., variation) of the dose-volume index due to dose calculation grid variation was as high as 8.2% (5.5 Gy in absolute dose) for planning target volumes (PTVs) and 13.3% (2.1 Gy in absolute dose) for planning at risk volumes (PRVs). Comparison results of dose distributions indicated that smaller volumes were more susceptible to uncertainties. The grid resolution of a 4 mm dose grid with a 2 mm fluence grid was recommended, since it can reduce the final dose calculation time by 63% compared to the accepted standard (2 mm dose grid with a 2 mm fluence grid resolution) while maintaining a similar level of dose-volume index variation. Threshold values that maintained adequate plan quality (DVH results of the PTVs and PRVs remained satisfied for their dose objectives) were 5 cm{sup 2} for minimum segment area and 5 MU for minimum MU. As the minimum MU parameter was increased, the number of segments and delivery time were decreased. Increasing the minimum segment area parameter decreased the plan MU, but had less of an effect on the number of segments and delivery time. Our delivery time model predicted delivery time to within 1.8%. Conclusions: Increasing the dose grid while maintaining a small fluence grid allows for improved planning efficiency without compromising plan quality. Delivery efficiency can be improved by increasing the minimum MU, but not the minimum segment area. However, increasing the respective minimum MU and/or the minimum segment area to any value greater than 5 MU and 5 cm{sup 2} is not recommended because it degrades plan quality.

  11. Optimal Model-Based Production Planning

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    Optimal Model-Based Production Planning for Refinery Operation Abdulrahman Alattas Advisor: Ignacio;Outline Introduction Refinery Planning Model Development LP Planning Models NLP Planning Models FI Model Aggregate Model Conclusion & Future work 2 #12;3 Introduction Refinery production planning

  12. National Grid Energy Efficiency Plans

    Broader source: Energy.gov [DOE]

    Presentation covers the National Grid Energy Efficiency plans and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

  13. INDEPENDENT REVIEW OF THE X-701B GROUNDWATER REMEDY, PORTSMOUTH, OHIO: TECHNICAL EVALUATION AND RECOMMENDATIONS

    SciTech Connect (OSTI)

    Looney, B.; Eddy-Dilek, C.; Costanza, J.; Rossabi, J.; Early, T.; Skubal, K.; Magnuson, C.

    2008-12-15T23:59:59.000Z

    The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issued by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are recommended, the team should identify the type of injection and target soil horizon for these injections; (2) Consider the feasibility of declaring Technical Impracticability and proceeding with the RCRA Cap for the X-701B; and (3) Provide a summary of other cost-effective technologies that could be implemented (especially for the lower Gallia). The Independent Technical Review team focused its evaluation solely on the X-701B source zone and contaminant plume. It did not review current or planned remedial activities at other plumes, waste areas, or landfills at the Portsmouth site, nor did it attempt to integrate such activities into its recommendations for X-701B. However, the ultimate selection of a remedy for X-701B by site personnel and regulators should take into account potentially synergistic efforts at other waste areas. Assessment of remedial alternatives in the context of site-wide management practices may reveal opportunities for leveraging and savings that would not otherwise be identified. For example, the cost of source-zone excavation or construction of a permeable reactive barrier at X-701B might be substantially reduced if contaminated soil could be buried on site at an existing or planned landfill. This allowance would improve the feasibility and competitiveness of both remedies. A comprehensive examination of ongoing and future environmental activities across the Portsmouth Gaseous Diffusion Plant is necessary to optimize the selection and timing of X-701B remediation with respect to cleanup efficiency, safety, and economics. A selected group of technical experts attended the technical workshop at the Portsmouth Gaseous Diffusion Plant from November 18 through 21, 2008. During the first day of the workshop, both contractor and DOE site personnel briefed the workshop participants and took them on a tour of the X-701B site. The initial briefing was attended by representatives of Ohio EPA who participated in the discussions. On subsequent days, the team reviewed baseline data and reports, were provided additional technical information from site personne

  14. Reactive power interconnection requirements for PV and wind plants : recommendations to NERC.

    SciTech Connect (OSTI)

    McDowell, Jason (General Electric, Schenectady, NY); Walling, Reigh (General Electric, Schenectady, NY); Peter, William (SunPower, Richmond, CA); Von Engeln, Edi (NV Energy, Reno, NV); Seymour, Eric (AEI, Fort Collins, CO); Nelson, Robert (Siemens Wind Turbines, Orlando, FL); Casey, Leo (Satcon, Boston, MA); Ellis, Abraham; Barker, Chris. (SunPower, Richmond, CA)

    2012-02-01T23:59:59.000Z

    Voltage on the North American bulk system is normally regulated by synchronous generators, which typically are provided with voltage schedules by transmission system operators. In the past, variable generation plants were considered very small relative to conventional generating units, and were characteristically either induction generator (wind) or line-commutated inverters (photovoltaic) that have no inherent voltage regulation capability. However, the growing level of penetration of non-traditional renewable generation - especially wind and solar - has led to the need for renewable generation to contribute more significantly to power system voltage control and reactive power capacity. Modern wind-turbine generators, and increasingly PV inverters as well, have considerable dynamic reactive power capability, which can be further enhanced with other reactive support equipment at the plant level to meet interconnection requirements. This report contains a set of recommendations to the North-America Electricity Reliability Corporation (NERC) as part of Task 1-3 (interconnection requirements) of the Integration of Variable Generation Task Force (IVGTF) work plan. The report discusses reactive capability of different generator technologies, reviews existing reactive power standards, and provides specific recommendations to improve existing interconnection standards.

  15. Recommendations for improvements to program and project management

    SciTech Connect (OSTI)

    Not Available

    1994-01-01T23:59:59.000Z

    Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

  16. Progress in Addressing DNFSB Recommendation 2002-1 Issues: Improving Accident Analysis Software Applications

    SciTech Connect (OSTI)

    VINCENT, ANDREW

    2005-04-25T23:59:59.000Z

    Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2002-1 (''Quality Assurance for Safety-Related Software'') identified a number of quality assurance issues on the use of software in Department of Energy (DOE) facilities for analyzing hazards, and designing and operating controls to prevent or mitigate potential accidents. Over the last year, DOE has begun several processes and programs as part of the Implementation Plan commitments, and in particular, has made significant progress in addressing several sets of issues particularly important in the application of software for performing hazard and accident analysis. The work discussed here demonstrates that through these actions, Software Quality Assurance (SQA) guidance and software tools are available that can be used to improve resulting safety analysis. Specifically, five of the primary actions corresponding to the commitments made in the Implementation Plan to Recommendation 2002-1 are identified and discussed in this paper. Included are the web-based DOE SQA Knowledge Portal and the Central Registry, guidance and gap analysis reports, electronic bulletin board and discussion forum, and a DOE safety software guide. These SQA products can benefit DOE safety contractors in the development of hazard and accident analysis by precluding inappropriate software applications and utilizing best practices when incorporating software results to safety basis documentation. The improvement actions discussed here mark a beginning to establishing stronger, standard-compliant programs, practices, and processes in SQA among safety software users, managers, and reviewers throughout the DOE Complex. Additional effort is needed, however, particularly in: (1) processes to add new software applications to the DOE Safety Software Toolbox; (2) improving the effectiveness of software issue communication; and (3) promoting a safety software quality assurance culture.

  17. RECOMMENDATIONS FOR ESTABLISHING AN IDENTITY ECOSYSTEM GOVERNANCE

    E-Print Network [OSTI]

    Perkins, Richard A.

    RECOMMENDATIONS FOR ESTABLISHING AN IDENTITY ECOSYSTEM GOVERNANCE STRUCTURE THE DEPARTMENT an Identity Ecosystem Governance Structure This page is intentionally left blank. #12;Recommendations for Establishing an Identity Ecosystem Governance Structure Foreword The Internet is one of the most

  18. Plan generation strategies for a knowledge based process planning system

    E-Print Network [OSTI]

    Hari, Umesh

    1993-01-01T23:59:59.000Z

    August 1993 Major Subject: Industrial Engineering PLAN GENERATION STRATEGIES FOR A KNOWLEDGE BASED PROCESS PLANNING SYSTEM A Thesis by UMESH HARI Approved as to style and content by: Ri ar . Maye (Chair of Committee) / i en ember) Newton C... valuable comments on the thesis work. I am indebted to Dr. C. J. Su for arousing my interest in process planning. I have learned a lot about process planning and solid modeling from him. I also thank him for directing me to relevant literature...

  19. Groundwater Monitoring Well Installation Work Plan

    E-Print Network [OSTI]

    ...................................................................................................................... 1 1.2.1 Water Quality........................................................................................................... 8 3.12 Quality Assurance.................................................................................................... 9 4.4 Environmental Management System

  20. Quality Work Plan Requirements | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015of 2005UNS Electric,RM ExitProperty Transfer or37 PMThe Office ofThisU.S.

  1. HSEP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.NewofGeothermal848 Unlimited Release1/2 HR 1.00 $ 0 1 HR 3.00

  2. Hanford Advisory Board FY2014 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.NewofGeothermal848 Unlimited Release1/2 HRHands-On6/12 Page1/2013

  3. Headquarters Facilities Work Planning and Control Program

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov.Energy02.pdf7 OPAM Flash2011-37 OPAMResourceEmployment Verification Headquarters

  4. PIC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeedingBiomass and4/26/11: eliza18OpenGovSystemeTrack, Bechtel

  5. Weatherization Assistance Program Quality Work Plan Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your DensityEnergy U.S.-China Electric Vehicle and03/02ReportWaste-to-Energy| Department of

  6. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our InstagramStructureProposedPAGE Creating a Geologic Play-13,6,HeFLiNHe9N 9N5/7/14

  7. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our InstagramStructureProposedPAGE Creating a Geologic Play-13,6,HeFLiNHe9N

  8. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70COMMUNITYResponses: QuestionDaniel- Transcribed

  9. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70COMMUNITYResponses: QuestionDaniel- Transcribed4/8/14

  10. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70COMMUNITYResponses: QuestionDaniel-

  11. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70COMMUNITYResponses: QuestionDaniel-

  12. Secretary Richardson Accepts Recommendations for Improving Security...

    National Nuclear Security Administration (NNSA)

    Secretary Richardson Accepts Recommendations for Improving Security at Nuclear Weapons Laboratories | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS...

  13. Staff summary of Issues & Recommendations Resident Fish

    E-Print Network [OSTI]

    1 Staff summary of Issues & Recommendations Resident Fish *preliminary draft, please refer to full recommendations for complete review 10/29/2013 10:07 AM 2009 Fish and Wildlife Program Section Section D. 7 Title: Resident Fish Mitigation (pg 22-23) Overview Generally, entities recommend that the existing language

  14. hurricane plan UNO HURRICANE PLAN

    E-Print Network [OSTI]

    Li, X. Rong

    hurricane plan #12;UNO HURRICANE PLAN TABLE OF CONTENTS INTRODUCTION....................................................................................................................................................... 1 I. HURRICANE EMERGENCY TEAMS Hurricane Emergency Implementation Team (HEIT)......................................... 2 PPoosstt

  15. The Sellafield Plan - 12458

    SciTech Connect (OSTI)

    Irving, Iain [Stakeholder Relations Director, Sellafield Ltd, Cumbria (United Kingdom)

    2012-07-01T23:59:59.000Z

    The Sellafield Performance Plan represents the start of a new era for the Sellafield site. It is a key driver in the Nuclear Management Partners mission to make Sellafield safer, cleaner, more productive, more cost effective and a better neighbour. When published in summer 2011, the Sellafield Performance Plan set out exactly what work would be completed at Sellafield between 2010/11 and 2025/26, how all of the facilities on the site interact, and what new facilities would be needed in order to deliver the risk and hazard reduction mission. The plan is the first credible and underpinned lifetime plan for the Sellafield site - the most complex part of the UK's civil nuclear estate. Under the Sellafield Performance Plan there are projected to be more jobs longer creating opportunities for the site, its workforce and the economic stability of West Cumbria. The Sellafield Ltd performance plan sets out how NMP will apply their global experience to improve operations, generate efficiencies and deliver detailed programmes of work with the aim of accelerating decommissioning and providing value for money. Successful delivery of the plan will also ensure the site continues to effectively operate critical national infrastructure that supports the UK's energy programme, and maintains the safe and secure management and storage of nuclear materials. The NDA and UK Government have demonstrated their confidence in NMP and Sellafield Ltd's capability to deliver this plan by providing the highest-ever Annual Site Funding Limit for the site in 2011/12. The Sellafield Performance Plan also creates both the foundation and the environment for a vibrant West Cumbrian economy through significant opportunities for the local supply chain and real prospects for further inward investment. By working flexibly and accelerating the decommissioning programme, the plan provides the opportunity for significant retraining to adapt to future challenges on the site and for other potential new nuclear missions in West Cumbria. (authors)

  16. Uncertainty and Sensitivity Analyses Plan

    SciTech Connect (OSTI)

    Simpson, J.C.; Ramsdell, J.V. Jr.

    1993-04-01T23:59:59.000Z

    Hanford Environmental Dose Reconstruction (HEDR) Project staff are developing mathematical models to be used to estimate the radiation dose that individuals may have received as a result of emissions since 1944 from the US Department of Energy's (DOE) Hanford Site near Richland, Washington. An uncertainty and sensitivity analyses plan is essential to understand and interpret the predictions from these mathematical models. This is especially true in the case of the HEDR models where the values of many parameters are unknown. This plan gives a thorough documentation of the uncertainty and hierarchical sensitivity analysis methods recommended for use on all HEDR mathematical models. The documentation includes both technical definitions and examples. In addition, an extensive demonstration of the uncertainty and sensitivity analysis process is provided using actual results from the Hanford Environmental Dose Reconstruction Integrated Codes (HEDRIC). This demonstration shows how the approaches used in the recommended plan can be adapted for all dose predictions in the HEDR Project.

  17. Recommendations for NEAMS Engagement with the NRC: Preliminary Report

    SciTech Connect (OSTI)

    Bernholdt, David E [ORNL

    2012-06-01T23:59:59.000Z

    The vision of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program is to bring a new generation of analytic tools to the nuclear engineering community in order to facilitate students, faculty, industry and laboratory researchers in investigating advanced reactor and fuel cycle designs. Although primarily targeting at advance nuclear technologies, it is anticipated that these new capabilities will also become interesting and useful to the nuclear regulator Consequently, the NEAMS program needs to engage with the Nuclear Regulatory Commission as the software is being developed to ensure that they are familiar with and ready to respond to this novel approach when the need arises. Through discussions between key NEAMS and NRC staff members, we tentatively recommend annual briefings to the Division of Systems Analysis in the NRC's Office of Nuclear Regulatory Research. However the NEAC subcommittee review of the NEAMS program may yield recommendations that would need to be considered before finalizing this plan.

  18. Target Tracking in the recommender space Toward a new recommender system based on Kalman filtering

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Target Tracking in the recommender space Toward a new recommender system based on Kalman filtering of the resources. Knowing this space, we propose an algorithm based on a Kalman filter to track the user's profile build a recommendation of contents. Keywords-recommender system; user profile; group profile; Kalman

  19. Working Document: Revisions as of July 10, 2001

    E-Print Network [OSTI]

    Wilkins, David E.

    Working Document: Revisions as of July 10, 2001 Summary of Multiagent Planning Architecture MPA Planning-Cell Managers 15 5.1 Meta Planning-Cell Manager Agents: Search Manager and Critic Manager . . . . . . . . . . . . . . 22 6.2.2 Scheduler Agent

  20. Working Document: Revisions as of July 10, 2001

    E-Print Network [OSTI]

    Wilkins, David E.

    Working Document: Revisions as of July 10, 2001 Summary of Multiagent Planning Architecture MPA Planning­Cell Managers 15 5.1 Meta Planning­Cell Manager Agents: Search Manager and Critic Manager . . . . . . . . . . . . . . 22 6.2.2 Scheduler Agent

  1. Working Document: Revisions as of October 9, 1998

    E-Print Network [OSTI]

    Wilkins, David E.

    Working Document: Revisions as of October 9, 1998 Summary of Multiagent Planning Architecture MPA Planning-Cell Managers 16 5.1 Meta Planning-Cell Manager and Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 6.2.1 Planner Agents: Search Manager

  2. CSREES Nutrient Management Working Meeting

    E-Print Network [OSTI]

    planning process ­ Nutrient management training ­ P-Indexes and tools developed ­ Educational materials #12Welcome CSREES Nutrient Management Working Meeting May 4 and 5, 2004 Atlanta, GA #12;University Objectives · Information Sharing Among States ­ Nutrient management regulations ­ Nutrient management

  3. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01T23:59:59.000Z

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  4. Targeting Net Zero Energy at Fort Carson: Assessment and Recommendations

    SciTech Connect (OSTI)

    Anderson, K.; Markel, T.; Simpson, M.; Leahey, J.; Rockenbaugh, C.; Lisell, L.; Burman, K.; Singer, M.

    2011-10-01T23:59:59.000Z

    The U.S. Army's Fort Carson installation was selected to serve as a prototype for net zero energy assessment and planning. NREL performed the comprehensive assessment to appraise the potential of Fort Carson to achieve net zero energy status through energy efficiency, renewable energy, and electric vehicle integration. This report summarizes the results of the assessment and provides energy recommendations. This study is part of a larger cross-laboratory effort that also includes an assessment of renewable opportunities at seven other DoD Front Range installations, a microgrid design for Fort Carson critical loads and an assessment of regulatory and market-based barriers to a regional secure smart grid.

  5. Strategy Guideline: Advanced Construction Documentation Recommendations for High Performance Homes

    SciTech Connect (OSTI)

    Lukachko, A.; Gates, C.; Straube, J.

    2011-12-01T23:59:59.000Z

    As whole house energy efficiency increases, new houses become less like conventional houses that were built in the past. New materials and new systems require greater coordination and communication between industry stakeholders. The Guideline for Construction Documents for High Performance Housing provides advice to address this need. The reader will be presented with four changes that are recommended to achieve improvements in energy efficiency, durability and health in Building America houses: create coordination drawings, improve specifications, improve detail drawings, and review drawings and prepare a Quality Control Plan.

  6. State and Local Energy Assurance Planning | Department of Energy

    Office of Environmental Management (EM)

    State and Local Energy Assurance Planning State and Local Energy Assurance Planning OE works closely with State and local governments on energy assurance issues. The office...

  7. Better Buildings Neighborhood Program Working with Utilities...

    Broader source: Energy.gov (indexed) [DOE]

    August 2, 2012 Better Buildings Neighborhood Program Working with Utilities Peer Exchange Call: Effective Strategies for Participating in Utility Planning Call Slides and...

  8. Climate VISION: Private Sector Initiatives: Electric Power: Work...

    Office of Scientific and Technical Information (OSTI)

    Work Plans The power sector, through EPICI, submitted its work plan in the form of a Memorandum of Understanding (MOU) with DOE. The MOU, most recently updated in September 2006,...

  9. CIPS Validation Data Plan

    SciTech Connect (OSTI)

    Nam Dinh

    2012-03-01T23:59:59.000Z

    This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

  10. Slimhole Handbook- Procedures and Recommendations for Slimhole...

    Open Energy Info (EERE)

    to library Report: Slimhole Handbook- Procedures and Recommendations for Slimhole Drilling and Testing in Geothermal Exploration Abstract No abstract prepared. Authors Jim...

  11. Slimhole Handbook- Procedures And Recommendations For Slimhole...

    Open Energy Info (EERE)

    Handbook- Procedures And Recommendations For Slimhole Drilling And Testing In Geothermal Exploration Jump to: navigation, search OpenEI Reference LibraryAdd to library Report:...

  12. EAC Recommendations Regarding Emerging and Alternative Regulatory...

    Energy Savers [EERE]

    Tools to Assist in Analysis (September 2014) EAC Recommendations Regarding Emerging and Alternative Regulatory Models and Modeling Tools to Assist in Analysis (September 2014)...

  13. Recommendations to Address Power Reliability Concerns Raised...

    Energy Savers [EERE]

    Reliability Concerns Raised as a Result of Pending Environmental Regulations for Electric Generation Stations Recommendations to Address Power Reliability Concerns Raised as a...

  14. Recommendation 192: Comments on Remediation Effectiveness Report

    Broader source: Energy.gov [DOE]

    The ORSSAB Recommendations and Comments on the Draft 2010 Remediation Effectiveness Report for the U.S. Department of Energy Oak Ridge Reservation.

  15. Wildlife Category Review. NWPCC. Final Recommendation to BPA. July 2009 Attachment 1

    E-Print Network [OSTI]

    years of proposed funding by the project sponsors. A five-year planning budget allows Bonneville Power Administration (Bonneville) and the sponsor flexibility in contracting and spending fluctuations over the five Northwest Power and Conservation Council Fish and Wildlife Project Funding Recommendations for the Wildlife

  16. Pepco Update on Current Construction Work and Mirant Generation...

    Energy Savers [EERE]

    Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Pepco Update on Current Construction Work and Mirant Generation Needs for...

  17. C:\\Backup\\Plan 5\\Portfolio Work\\Olivia\\SAAC 2010\\130125 SAAC Meeting\\Meeting notes\\130125 SAAC notes 130822.docx Page1 130125 SAAC NOTES 130822.DOCX

    E-Print Network [OSTI]

    to a decision. Talk about tools and procedures for arriving at a decision. These are all things that we've done and Conservation Council's Systems Analysis Advisory Committee (SAAC) met on Friday, January 25, 2013. Attached of the recommendations of the RPM Review Committee was to have the Council develop a single risk metric additive to cost

  18. Elements of doing work at SSRL (rev

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    follow JHAMs, safety procedures, and work plans (e.g., non-routine JHAMs, equipment lockout procedures, and radiation safety work control forms). 2. Ensure STAs are up to date...

  19. Facebook Application for Place Recommendation . . 40002

    E-Print Network [OSTI]

    Runapongsa, Kanda

    Facebook Application for Place Recommendation 1 , 2 1,2 . . 40002 E-mail: 1,2 pjiranuwatt. This article proposes a Facebook application that recommends places based on the number of check is gathered via Facebook API requests. The experimental results of the developed Facebook application show

  20. Staff summary of Issues & Recommendations Strongholds

    E-Print Network [OSTI]

    recommendations for complete review 10/29/2013 10:06 AM 2009 Fish and Wildlife Program Section Section II. D. 1, b, c) pg. 15 Overview In the current program, a salmon, steelhead, or resident fish stronghold. Another recommendation is to prioritize native fish strongholds where a reasonable chance of eradicating

  1. BUILDING 96 RECOMMENDATION FOR SOURCE AREA REMEDIATION

    E-Print Network [OSTI]

    OU III BUILDING 96 RECOMMENDATION FOR SOURCE AREA REMEDIATION FINAL Prepared by: Brookhaven FOR U.S. Department of Energy March 2009 #12;i OU III BUILDING 96 RECOMMENDATION FOR SOURCE AREA..................................................................................................................4 4.0 Building 96 ­ Operational Background

  2. Recommended Practice for Accepting New Concrete Pavement

    E-Print Network [OSTI]

    Recommended Practice for Accepting New Concrete Pavement Surfaces for Tire/Pavement Noise Designation: CPSCP PP 1-11 (rev 3/1/2011) National Concrete Pavement Technology Center 2711 South Loop Drive, Suite 4700 Ames, IA 50010 #12;PP 1-1 CPSCP Recommended Practice for Accepting New Concrete Pavement

  3. SJSU Library Budget Study Report and Recommendations

    E-Print Network [OSTI]

    Gleixner, Stacy

    1 SJSU Library Budget Study Report and Recommendations Prepared by University Library Board April 2005 #12;2 Note to the reader The original April 2003 Library Budget Study Report and Recommendations) data that were used in this report are updated every two years. The Library Budget Study report

  4. FY95 software project management plan: TMACS, CASS computer systems

    SciTech Connect (OSTI)

    Spurling, D.G.

    1994-11-11T23:59:59.000Z

    The FY95 Work Plan for TMACS and CASS Software Projects describes the activities planned for the current fiscal year. This plan replaces WHC-SD-WM-SDP-008. The TMACS project schedule is included in the TWRS Integrated Schedule.

  5. Recommended research on LNG safety

    SciTech Connect (OSTI)

    Carpenter, H.J.; Gilmore, F.R.

    1981-03-01T23:59:59.000Z

    The US Department of Energy (DOE) is conducting research on the safety and other environmental aspects of liquefied energy gases including liquefied natural gas (LNG). The effort reported here was conducted as part of the planning for further research into the safety aspects of transporting and storing LNG, with primary emphasis on public safety. Although the modern LNG industry has enjoyed excellent success in providing for safe operations, significant questions remain on the part of many, the expressions of which were intensified with the addition of marine-based LNG import terminals. Public safety with regard to large-scale importation of this fuel has received widespread attention in the US Congress, state legislatures, county and city governments, and from various individuals and public groups, with coverage in all the news media, including books published on the subject. The safety concerns have centered around the consequences to the public of a large spill of the cryogenic liquid from an ocean tanker or a larger storage tank, either of which might hold as much as 125,000 m/sup 3/ of LNG.

  6. La Comunidad del Futuro Hidalgo Comprehensive Plan: 2010 

    E-Print Network [OSTI]

    Bond, Alsie; Carlson, Todd B.; Sanchez, J. Martin; Schumann, Gregory; Baker, Barton; Benthul, Bart; Biggs, John; Cervantes, Xavier; Cross, Shelia; Derkits, Janna; Gonzalez, Roberto; Head, Aric; McCoy, Michelle; Nance, Tara; Orr, Karen; Phillips, Kimberly; Schoonmaker, Scott; Sims, Stephens; Soltan, Laleh; Stevens, Thomas; Hahn, Mary; Teal, Mike; Wiruchaphan, Sani; Yang, Min-Fang; Pugh, David

    1995-01-01T23:59:59.000Z

    Developed conceptual designs for the Office Park and Mercado, Bridge Street, and Coma Street. Teams evaluated current zoning ordinances and made recommendations for the future. The comprehensive plan was formulated and ...

  7. TARGET TRACKING IN THE RECOMMENDER SPACE Toward a new recommender system based on Kalman filtering

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    TARGET TRACKING IN THE RECOMMENDER SPACE Toward a new recommender system based on Kalman filtering, France Anne.boyer@loria.fr Keywords: Kalman filtering, target tracking, recommender systems. user tracking by Kalman filtering. We assume that users and their seen resources are vectors

  8. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15T23:59:59.000Z

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  9. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15T23:59:59.000Z

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  10. 324 Building fire hazards analysis implementation plan

    SciTech Connect (OSTI)

    Eggen, C.D.

    1998-09-16T23:59:59.000Z

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480.7A. Additionally, one observation was provided. To date, four of the recommendations and the one observation have been completed. Actions identified for seven of the recommendations are currently in progress. Exemption requests will be transmitted to DOE-RL for three of the recommendations. Six of the recommendations are related to future shut down activities of the facility and the corrective actions are not being addressed as part of this plan. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process. Major Life Safety Code concerns have been corrected. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. BVMC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7.

  11. Working Paper

    E-Print Network [OSTI]

    2010-07-16T23:59:59.000Z

    Jul 2, 2010 ... Working Paper. Branch and Bound Algorithms for ...... interest when evaluating the performance. First, each derived subproblem means usage ...

  12. NIF Title III engineering plan

    SciTech Connect (OSTI)

    Deis, G

    1998-06-01T23:59:59.000Z

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  13. Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a single BPA data repository * Data quality improvements * Improve model alignment with WECC planning data * Improve WECC base case coordination * Align the BPA data model with...

  14. Business Plan Development Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    by the establishment of additional work stations. Raw materials purchasing and subsequent manufacturing need to be done purchasing and manufacturing under my personal name to-date. The concept of the device I patented market, marketing plan, web development, manufacturing plan to allow for maximum profit margin while

  15. CH 5 MANAGEMENT PLAN.DOC 5-1 5 Management Plan

    E-Print Network [OSTI]

    CH 5 MANAGEMENT PLAN.DOC 5-1 5 Management Plan 5.1 Vision The Willamette Subbasin Plan Oversight drafted the following vision: Willamette Basin citizens from all walks of life prize and enjoy a quilt-work of natural areas, working landscapes, and distinctive communities, from the crest of the Coast Range

  16. Stranded Fuel, Orphan Sites, Dead Plants: Transportation Planning Considerations After the BRC Report - 13393

    SciTech Connect (OSTI)

    Thrower, Alex W. [The Thrower Group LLC, Richmond, VA (United States)] [The Thrower Group LLC, Richmond, VA (United States)

    2013-07-01T23:59:59.000Z

    The author explores transportation, packaging and storage questions related to a primary recommendation of the Blue Ribbon Commission on America's Nuclear Future; i.e., that fuel from shutdown plants be removed to consolidated storage as soon as possible to enable final decommissioning and beneficial re-use of those sites. The paper discusses the recommendations of the BRC, the implications and challenges that implementing those recommendations present, and provides recommended solutions for beginning the multi-year planning, coordination, material acquisition, and communications processes that will be needed to move fuel from shutdown plants when a destination site becomes available. Removal of used nuclear fuel from shutdown reactor sites (which are serving no other purpose other than storing SNF and GTCC, at considerable expense) was a central recommendation of the BRC, for a number of reasons. This recommendation was one of the most widely acclaimed that the Commission put forward. However, there are significant challenges (such as availability of fuel canister overpacks, lack of infrastructure, handling constraints and others) that will need to be addressed, apart from the critically important identification of a suitable and workable storage destination site. Resolving these logistical challenges will need to begin even before a destination site is identified, given the long lead-times required for planning and procurement. Based on information available today, it is possible to make informed predictions about what will be needed to modify existing contractual arrangements with utilities, address equipment and infrastructure needs, and begin working with states, tribes and local governments to start initial preparation needs. If DOE, working with industry and other experienced parties, can begin planning and acquisition activities in the near term, overall schedule risk can be reduced and potential cost avoidance achieved. The most immediate benefit will accrue to the operators of the shutdown plants, but beginning to accept fuel as required under the NWPA will reduce the liability to the federal government, and also offer some assurance to other utilities and the public that DOE (or another entity if one is established) is capable of meeting its obligations under the NWPA. The indirect benefits, therefore, will be quite broad. (authors)

  17. Recommendation 177: Facilitating Early Public Input

    Broader source: Energy.gov [DOE]

    DOE should initiate consultation meetings with stake holders immediately to allow early public input into the planning for IFDP

  18. An Anti_Turing Test: Reduced Variables for Social Network Friends' Recommendations

    E-Print Network [OSTI]

    Exman, Iaakov

    2014-01-01T23:59:59.000Z

    A routine activity of social networks servers is to recommend candidate friends that one may know and stimulate addition of these people to one's contacts. An intriguing issue is how these recommendation lists are composed. This work investigates the main variables involved in the recommendation activity, in order to reproduce these lists including its time dependent characteristics. We propose relevant algorithms. Besides conventional approaches, such as friend_of_a_friend, two techniques of importance have not been emphasized in previous works: randomization and direct use of interestingness criteria. An automatic software tool to implement these techniques is proposed. Its architecture and implementation are discussed. After a preliminary analysis of actual data collected from social networks, the tool is used to simulate social network friends' recommendations.

  19. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  20. RCRA Corrective Action Plan. Interim report (Final)

    SciTech Connect (OSTI)

    Not Available

    1988-06-01T23:59:59.000Z

    The RCRA Corrective Action Plan (CAP) will assist in the development of Corrective Action Orders (Section 3008(h)) and corrective action requirements in permit applications and permits (Section 3004(u) (v)). The purpose of the CAP is to aid Regions and States in determining and directing the specific work the owner/operator or respondent must perform, as part of a complete corrective action program. The CAP should be used as a technical framework during the development of Corrective Action Orders and corrective action permit regulations. The CAP provides a framework for the development of a site-specific schedule of compliance to be included in a permit or a compliance schedule in a Corrective Action Order. It does so by laying out scopes of work for the three essential phases of a complete corrective action program. These three phases and their objectives are as follows: (1) RCRA Facility Investigation (RFI) - to evaluate thoroughly the nature and extent of the release of hazardous waste and hazardous constituents and to gather necessary data to support the Corrective Measure Study; (2) Corrective Measures Study (CMS) - to develop and evaluate a corrective measure alternative or alternatives and to recommend the final corrective measure or measures; and (3) Corrective Measures Implementation (CMI) - to design, construct, operate, maintain and monitor the performance of the corrective measure or measures selected.

  1. Consistence beats causality in recommender systems

    E-Print Network [OSTI]

    Zhu, Xuzhen; Hu, Zheng; Zhang, Ping; Zhou, Tao

    2015-01-01T23:59:59.000Z

    The explosive growth of information challenges people's capability in finding out items fitting to their own interests. Recommender systems provide an efficient solution by automatically push possibly relevant items to users according to their past preferences. Recommendation algorithms usually embody the causality from what having been collected to what should be recommended. In this article, we argue that in many cases, a user's interests are stable, and thus the previous and future preferences are highly consistent. The temporal order of collections then does not necessarily imply a causality relationship. We further propose a consistence-based algorithm that outperforms the state-of-the-art recommendation algorithms in disparate real data sets, including \\textit{Netflix}, \\textit{MovieLens}, \\textit{Amazon} and \\textit{Rate Your Music}.

  2. Geothermal Technologies Program Blue Ribbon Panel Recommendations

    Broader source: Energy.gov [DOE]

    This report describes the recommendations of the Geothermal Blue Ribbon Panel, a panel of geothermal experts assembled in March 2011 for a discussion on the future of geothermal energy in the U.S.

  3. Staff summary of Issues & Recommendations Renewable Energy

    E-Print Network [OSTI]

    1 Staff summary of Issues & Recommendations Renewable Energy *Preliminary draft, please refer fish and wildlife impacts associated with renewable energy development. The Council also received invasive plants as biofeedstocks. I. Summary A. Consider the effects of renewable energy development

  4. Review of activities and plans for solar energy in Federal buildings

    SciTech Connect (OSTI)

    Not Available

    1980-10-01T23:59:59.000Z

    The purpose of this report is to provide the Department of Energy's Solar Federal Buildings Program with data on the Federal agencies' activities and plans regarding the use of solar energy in their buildings, and consequently, to make recommendations concerning the Solar Federal Buildings Program's plans. Specifically this report encompasses an analysis of agencies Ten Year Buildings construction, leasing and retrofit plans to provide visibility for and detailed knowledge of Federal agencies planning regarding solar and other renewable energy resources. The results of the analysis conducted, pertinent statistical information regarding planned solar projects, and recommendations concerning the SFBP plans are presented.

  5. Proceedings of national avian-wind power planning meeting 2

    SciTech Connect (OSTI)

    NONE

    1998-02-01T23:59:59.000Z

    This meeting was the second in a series. The purposes of this meeting were to: (1) provide information on avian/wind power interactions that will help meet the needs of regulators, researchers, and other stakeholders concerned with responsible development and permitting of wind plants; (2) create dialogue among regulators, researchers and other stakeholders to help all parties understand the role that research can play in responsible development and permitting of wind plants, and allow researchers to understand the relevance of their research to the process; and (3) propose research projects and the appropriate sponsorship. The meeting began with oral presentations and discussions of nine White Papers on the theory and methods for studying and understanding impacts. The Proceedings include the written version of each of the nine White Papers, plus a summary of the oral discussion associated with each paper. The second part of the meeting consisted of four working group sessions: (1) site evaluation and pre-permit research and planning; (2) operational monitoring; (3) modeling and forecasting, including population dynamics models; and (4) avian behavior and mortality reduction. The Proceedings includes a summary of the discussions on these topics, including each working group`s recommendations for future research or associated activities. A final plenary session drew together the main recommendations.

  6. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect (OSTI)

    POWELL, P.A.

    2000-03-29T23:59:59.000Z

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  7. Specific recommendations for accurate and direct use of PET-CT in PET guided radiotherapy for head and neck sites

    SciTech Connect (OSTI)

    Thomas, C. M., E-mail: christopher.thomas@gstt.nhs.uk; Convery, D. J.; Greener, A. G. [Guy's and St. Thomas’ NHS Foundation Trust, Medical Physics Department, St. Thomas’ Hospital, London SE1 7EH (United Kingdom)] [Guy's and St. Thomas’ NHS Foundation Trust, Medical Physics Department, St. Thomas’ Hospital, London SE1 7EH (United Kingdom); Pike, L. C.; Baker, S.; Woods, E. [Division of Imaging Sciences and Biomedical Engineering, King's College London, King's Health Partners, St. Thomas’ Hospital, London SE1 7EH (United Kingdom)] [Division of Imaging Sciences and Biomedical Engineering, King's College London, King's Health Partners, St. Thomas’ Hospital, London SE1 7EH (United Kingdom); Hartill, C. E. [Guy's and St. Thomas’ NHS Foundation Trust, Radiotherapy, Clinical Outpatients Clinic, St. Thomas’ Hospital, London SE1 7EH (United Kingdom)] [Guy's and St. Thomas’ NHS Foundation Trust, Radiotherapy, Clinical Outpatients Clinic, St. Thomas’ Hospital, London SE1 7EH (United Kingdom)

    2014-04-15T23:59:59.000Z

    Purpose: To provide specific experience-based guidance and recommendations for centers wishing to develop, validate, and implement an accurate and efficient process for directly using positron emission tomography-computed tomography (PET-CT) for the radiotherapy planning of head and neck cancer patients. Methods: A PET-CT system was modified with hard-top couch, external lasers and radiotherapy immobilization and indexing devices and was subject to a commissioning and quality assurance program. PET-CT imaging protocols were developed specifically for radiotherapy planning and the image quality and pathway tested using phantoms and five patients recruited into an in-house study. Security and accuracy of data transfer was tested throughout the whole data pathway. The patient pathway was fully established and tested ready for implementation in a PET-guided dose-escalation trial for head and neck cancer patients. Results: Couch deflection was greater than for departmental CT simulator machines. An area of high attenuation in the couch generated image artifacts and adjustments were made accordingly. Using newly developed protocols CT image quality was suitable to maintain delineation and treatment accuracy. Upon transfer of data to the treatment planning system a half pixel offset between PET and CT was observed and corrected. By taking this into account, PET to CT alignment accuracy was maintained below 1 mm in all systems in the data pathway. Transfer of structures delineated in the PET fusion software to the radiotherapy treatment planning system was validated. Conclusions: A method to perform direct PET-guided radiotherapy planning was successfully validated and specific recommendations were developed to assist other centers. Of major concern is ensuring that the quality of PET and CT data is appropriate for radiotherapy treatment planning and on-treatment verification. Couch movements can be compromised, bore-size can be a limitation for certain immobilization techniques, laser positioning may affect setup accuracy and couch deflection may be greater than scanners dedicated to radiotherapy. The full set of departmental commissioning and routine quality assurance tests applied to radiotherapy CT simulators must be carried out on the PET-CT scanner. CT image quality must be optimized for radiotherapy planning whilst understanding that the appearance will differ between scanners and may affect delineation. PET-CT quality assurance schedules will need to be added to and modified to incorporate radiotherapy quality assurance. Methods of working for radiotherapy and PET staff will change to take into account considerations of both parties. PET to CT alignment must be subject to quality control on a loaded and unloaded couch preferably using a suitable emission phantom, and tested throughout the whole data pathway. Data integrity must be tested throughout the whole pathway and a system included to verify that delineated structures are transferred correctly. Excellent multidisciplinary team communication and working is vital, and key staff members on both sides should be specifically dedicated to the project. Patient pathway should be clearly devised to optimize patient care and the resources of all departments. Recruitment of a cohort of patients into a methodology study is valuable to test the quality assurance methods and pathway.

  8. 1my money @ work it's my time to save

    E-Print Network [OSTI]

    1my money @ work it's my time to save my money @ work #12;Your plan balances, investment @ work Millions of Canadians participate in workplace retirement and savings plans. Now, it's your turn because it's your money and your future. Saving at work makes it even easier to attain your goals whether

  9. Recommendations for NRC policy on shift scheduling and overtime at nuclear power plants

    SciTech Connect (OSTI)

    Lewis, P.M.

    1985-07-01T23:59:59.000Z

    This report contains the Pacific Northwest Laboratory's (PNL's) recommendations to the US Nuclear Regulatory Commission (NRC) for an NRC policy on shift scheduling and hours of work (including overtime) for control room operators and other safety-related personnel in nuclear power plants. First, it is recommended that NRC make three additions to its present policy on overtime: (1) limit personnel to 112 hours of work in a 14-day period, 192 hours in 28 days, and 2260 hours in one year; exceeding these limits would require plant manager approval; (2) add a requirement that licensees obtain approval from NRC if plant personnel are expected to exceed 72 hours of work in a 7-day period, 132 hours in 14 days, 228 hours in 28 days, and 2300 hours in one year; and (3) make the policy a requirement, rather than a nonbinding recommendation. Second, it is recommended that licensees be required to obtain NRC approval to adopt a routine 12-hour/day shift schedule. Third, it is recommended that NRC add several nonbinding recommendations concerning routine 8-hour/day schedules. Finally, because additional data can strengthen the basis for future NRC policy on overtime, five methods are suggested for collecting data on overtime and its effects. 44 refs., 10 tabs.

  10. Recommendations on Model Fidelity for Wind Turbine Gearbox Simulations: Preprint

    SciTech Connect (OSTI)

    Guo, Y.; Keller, J.; La Cava, W.; Austin, J.; Nejad, A. R.; Halse, C.; Bastard, L.; Helsen, J.

    2015-01-01T23:59:59.000Z

    This work investigates the minimum level of fidelity required to accurately simulate wind turbine gearboxes using state-of-the-art design tools. Excessive model fidelity including drivetrain complexity, gearbox complexity, excitation sources, and imperfections, significantly increases computational time, but may not provide a commensurate increase in the value of the results. Essential design parameters are evaluated, including the planetary load-sharing factor, gear tooth load distribution, and sun orbit motion. Based on the sensitivity study results, recommendations for the minimum model fidelities are provided.

  11. FRANK L. CASSIDY NORTHWEST POWER PLANNING COUNCIL

    E-Print Network [OSTI]

    project budgets through the sequence of provincial review decisions so that the total funding available" of project budgets that received funding recommendations from both the Columbia Basin Fish and WildlifeFRANK L. CASSIDY JR. "Larry" CHAIRMAN Washington Tom Karier Washington NORTHWEST POWER PLANNING

  12. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition...

  13. Recommendations, credits and discounts : essays in behavioral decision making

    E-Print Network [OSTI]

    Maciejovsky, Boris

    2009-01-01T23:59:59.000Z

    Essay 1: Translation Errors in the Aggregation of Consumer Recommendations There has been a substantial increase of websites providing consumers with recommendations about products and services. These recommendations are ...

  14. A LONG-TERM SUSTAINABLE PLAN FOR DALHOUSIE LIBRARY COLLECTIONS

    E-Print Network [OSTI]

    Brownstone, Rob

    A LONG-TERM SUSTAINABLE PLAN FOR DALHOUSIE LIBRARY COLLECTIONS 2004 ­ 2008: INPUT FOR BAC XXVIII interests of the University, that a long- term sustainable plan for the future of library collections of a base level of resources the Libraries are recommending a modest sustained level of growth to match

  15. Building America Expert Meeting: Recommended Approaches to Humidity...

    Energy Savers [EERE]

    Building America Expert Meeting: Recommended Approaches to Humidity Control in High Performance Homes Building America Expert Meeting: Recommended Approaches to Humidity Control in...

  16. EAC 2012 Storage Report: Progress and Prospects - Recommendations...

    Broader source: Energy.gov (indexed) [DOE]

    2012 Storage Report and Recommendations for DOE Action, approved at the October 15-16, 2012 EAC Meeting. 2012 Storage Report: Progress and Prospects - EAC Recommendations for DOE...

  17. EAC Recommendations for DOE Action Regarding Consumer Acceptance...

    Energy Savers [EERE]

    Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action...

  18. EAC Recommendations for DOE Action Regarding the Electricity...

    Energy Savers [EERE]

    the Electricity Workforce - October 17, 2012 EAC Recommendations for DOE Action Regarding the Electricity Workforce - October 17, 2012 EAC Recommendations for DOE Action Regarding...

  19. Status and EAC Recommendations for Electricity Delivery Workforce...

    Energy Savers [EERE]

    Status and EAC Recommendations for Electricity Delivery Workforce (September 2014) Status and EAC Recommendations for Electricity Delivery Workforce (September 2014) This memo,...

  20. Recommended Best Practices for the Characterization of Storage...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recommended Best Practices for the Characterization of Storage Properties of Hydrogen Storage Materials Recommended Best Practices for the Characterization of Storage Properties of...

  1. Federal Task Force Sends Recommendations to President on Fostering...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Task Force Sends Recommendations to President on Fostering Clean Coal Technology Federal Task Force Sends Recommendations to President on Fostering Clean Coal Technology August 12,...

  2. Recommended Best Practices for the Characterization of Storage...

    Energy Savers [EERE]

    Recommended Best Practices for the Characterization of Storage Properties of Hydrogen Storage Materials - Section 6 Thermal Properties of Hydrogen Storage Materials Recommended...

  3. Aerocapacitor commercialization plan

    SciTech Connect (OSTI)

    NONE

    1995-09-12T23:59:59.000Z

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  4. Georgia Institute of Technology chilled water system evaluation and master plan

    SciTech Connect (OSTI)

    NONE

    1996-05-15T23:59:59.000Z

    As the host of the Olympic Village for the 1996 Atlanta Olympics, Georgia Tech has experienced a surge in construction activities over the last three years. Over 1.3 million square feet of new buildings have been constructed on the Georgia Tech campus. This growth has placed a strain on the Georgia Tech community and challenged the facilities support staff charged with planning and organizing utility services. In concert with Olympic construction, utility planners have worked to ensure long term benefits for Georgia Tech facilities while meeting the short term requirements of the Olympic Games. The concentration of building construction in the northwest quadrant of the campus allowed planners to construct a satellite chilled water plant to serve the needs of this area and provide the opportunity to integrate this section of the campus with the main campus chilled water system. This assessment and master plan, funded in part by the US Department of Energy, has evaluated the chilled water infrastructure at Georgia Tech, identified ongoing problems and made recommendations for long term chilled water infrastructure development and efficiency improvements. The Georgia Tech office of Facilities and RDA Engineering, Inc. have worked together to assemble relevant information and prepare the recommendations contained in this document.

  5. Working Document: Revisions as of October 9, 1998

    E-Print Network [OSTI]

    Wilkins, David E.

    Working Document: Revisions as of October 9, 1998 Multiagent Planning Architecture MPA Version 1 and Agent Library . . . . . . . . . . . . . . . . . . . . . 10 3.2 Managing Agents-Cell Managers 27 5.1 Meta Planning-Cell Manager . . . . . . . . . . . . . . . . . . . . . . . . . . 28 5

  6. Recommended plutonium release fractions from postulated fires. Final report

    SciTech Connect (OSTI)

    Kogan, V.; Schumacher, P.M.

    1993-12-01T23:59:59.000Z

    This report was written at the request of EG&G Rocky Flats, Inc. in support of joint emergency planning for the Rocky Flats Plant (RFP) by EG&G and the State of Colorado. The intent of the report is to provide the State of Colorado with an independent assessment of any respirable plutonium releases that might occur in the event of a severe fire at the plant. Fire releases of plutonium are of interest because they have been used by EG&G to determine the RFP emergency planning zones. These zones are based on the maximum credible accident (MCA) described in the RFP Final Environmental Impact Statement (FEIS) of 1980, that MCA is assumed to be a large airplane crashing into a RFP plutonium building.The objective of this report was first, to perform a worldwide literature review of relevant release experiments from 1960 to the present and to summarize those findings, and second, to provide recommendations for application of the experimental data to fire release analyses at Rocky Flats. The latter step requires translation between experimental and expected RFP accident parameters, or ``scaling.`` The parameters of particular concern are: quantities of material, environmental parameters such as the intensity of a fire, and the physico-chemical forms of the plutonium. The latter include plutonium metal, bulk plutonium oxide powder, combustible and noncombustible wastes contaminated with plutonium oxide powder, and residues from plutonium extraction processes.

  7. TANKS 18 AND 19-F EQUIPMENT GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS

    SciTech Connect (OSTI)

    Stefanko, D.; Langton, C.

    2011-12-15T23:59:59.000Z

    The United States Department of Energy (US DOE) intends to remove Tanks 18-F and 19-F at the Savannah River Site (SRS) from service. The high-level waste (HLW) tanks have been isolated from the F-area Tank Farm (FTF) facilities and will be filled with cementitious grout for the purpose of: (1) physically stabilizing the empty volumes in the tanks, (2) limiting/eliminating vertical pathways from the surface to residual waste on the bottom of the tanks, (3) providing an intruder barrier, and (4) providing an alkaline, chemical reducing environment within the closure boundary to limit solubility of residual radionuclides. Bulk waste and heel waste removal equipment will remain in Tanks 18-F and 19-F when the tanks are closed. This equipment includes: mixer pumps, transfer pumps, transfer jets, equipment support masts, sampling masts and dip tube assemblies. The current Tank 18-F and 19-F closure strategy is to grout the internal void spaces in this equipment to eliminate fast vertical pathways and slow water infiltration to the residual material on the tank floor. This report documents the results of laboratory testing performed to identify a grout formulation for filling the abandoned equipment in Tanks 18-F and 19-F. The objective of this work was to formulate a flowable grout for filling internal voids of equipment that will remain in Tanks 18-F and 19-F during the final closures. This work was requested by V. A. Chander, Tank Farm Closure Engineering, in HLW-TTR-2011-008. The scope for this task is provided in the Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The specific objectives of this task were to: (1) Prepare and evaluate the SRR cooling coil grout identified in WSRC-STI-2008-00298 per the TTR for this work. The cooling coil grout is a mixture of BASF MasterFlow{reg_sign} 816 cable grout (67.67 wt. %), Grade 100 ground granulated blast furnace slag (7.52 wt. %) and water (24.81 wt. %); (2) Identify equipment grout placement and performance properties; (3) Design up to 2 additional grout systems for filling the Tank 18-F and Tank 19-F equipment; (4) Prepare samples of candidate grouts and measure fresh properties, thermal properties and cured properties; (5) Recommend a grout for the Tier 1A equipment fill mock up - ADMP 4 foot high mock up, 1 inch and 2 inch pipes; (6) Support procurement of materials for the Tier 1A equipment fill mock up test; (7) Prepare samples of the recommended grout for hydraulic property measurements which can be used for comparison to values used in the F- Tank Farm Performance Assessment (PA); and (8) Document equipment fill grout data and recommendations in a report.

  8. Tanks 18 And 19-F Structural Flowable Grout Fill Material Evaluation And Recommendations

    SciTech Connect (OSTI)

    Langton, C. A.; Stefanko, D. B.

    2013-04-23T23:59:59.000Z

    Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: 1) physically stabilize the final landfill by filling the empty volume in the tanks with a non-compressible material; 2) provide a barrier for inadvertent intrusion into the tank; 3) reduce contaminant mobility by a) limiting the hydraulic conductivity of the closed tank and b) reducing contact between the residual waste and infiltrating water; and 4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identify a single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: 1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). 2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. 3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. 4) Prepare samples for hydraulic property measurements for comparison to the values in the F and H- Tank Farm Performance Assessments (PAs). 5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification [Forty, 2011 a, b, c]. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP#8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification [Forty 2011 a] and requested admixture recommendations and property confirmation for this formulation [Forty, 2011 b]. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12. Mix, LP#8-16 is recommended for inclusion in the specification for furnishing and delivering tank closure grout for Tanks 18-F and 19-F [Forty, 2011 c]. A shrinkage compensating variation of this mix, LP#16C, has not been fully developed and characterized at this time.

  9. Working Copy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del SolStrengtheningWildfires may contribute more to &83 3.3At DOE Working At

  10. Working Copy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del SolStrengtheningWildfires may contribute more to &83 3.3At DOE Working

  11. A Biological Inventory and Conservation Recommendations

    E-Print Network [OSTI]

    A Biological Inventory and Conservation Recommendations for the Great Sand Dunes and San Luis Lakes General Services Building Ft. Collins, Colorado 80523 March 1999 i #12;A Biological Inventory PROGRAM SAGUACHE, COLORADO P.O. Box 674, Saguache, Colorado 81149 ii #12;Biological Inventory of the Great

  12. Staff summary of Issues & Recommendations Program Framework

    E-Print Network [OSTI]

    the basin. They note that the geographic areas that were most impacted by the development of the hydro-system, the Council received recommendations from some entities to use an integrated life cycle approach to survival improvements. The Program should consider the entire life cycle when evaluating the benefit of mitigation

  13. Recommended GE Curriculum for the BSEE Majors

    E-Print Network [OSTI]

    Ravikumar, B.

    Recommended GE Curriculum for the BSEE Majors Area Subjects Suggested GE Courses Courses Actual units GE Units A. Communication and Critical Thinking (9) A.2. Fund. of Communication ENGL 101 4 4 A.3, Theatre, Dance and Music and Film Select from the GE C.1 list in the SSU Catalog 3 3 C.2. Literature

  14. Clinical Psychology Center Center Review Recommendation

    E-Print Network [OSTI]

    Vonessen, Nikolaus

    Clinical Psychology Center Center Review Recommendation B. Review and Approval Process 2 to address issues of common interest. The purpose of the Clinical Psychology Center (CPC) is to serve as the primary clinical training site for graduate students; to provide high quality, affordable mental health

  15. SJSU Library Budget Study Report and Recommendations

    E-Print Network [OSTI]

    Gleixner, Stacy

    1 SJSU Library Budget Study Report and Recommendations SJSU University Library Board Study April 2003 The San Jose State University Library is experiencing increased difficulty in meeting faculty and student library support and resource needs. A significant number of book, journal, and media requests from

  16. A Tourist Recommendation System Employing Probabilistic Semantics

    E-Print Network [OSTI]

    Hammerton, James

    Smart City system. Keywords: semantics, tourism, recommendation engine, probabilistic reasoning, rule focuses on automating the object selection and visit schedule creation. Smart City (SC) is a semantic Estonia. The Smart City project uses experience from the Smartmuseum project [9] and applies some

  17. WHB/WTB SPACE PROGRAM ANALYSIS FOR SITE RECOMMENDATION

    SciTech Connect (OSTI)

    W.D. Lindholm

    2000-05-25T23:59:59.000Z

    The purpose of this analysis is to identify and evaluate the functional space and spatial relationship requirements for the two main nuclear buildings, the Waste Handling Building (WHB) and the Waste Treatment Building (WTB), which are part of the Repository Surface Facilities. This analysis is consistent with the Development Plan for ''WHB/WTB Space Program Analysis for Site Recommendation'' (CRWMS M&O 2000r), which concentrates on the primary, primary support, facility support, and miscellaneous building support areas located in the WHB and WTB. The development plan was completed in accordance with AP-2.134, ''Technical Product Development Planning''. The objective and scope of this analysis is to develop a set of spatial parameters (e.g., square footage, room heights, etc.) and layout requirements (e.g., adjacency and access/circulation requirements, etc.) from which preliminary building floor plans are developed and presented as figures. The resulting figures will provide information to support the Site Recommendation and the total system life cycle cost. This analysis uses the Viability Assessment (VA) ''Surface Nuclear Facilities Space Program Analysis'' (SPA) (CRWMS M&O 1997c) as the baseline reference document and further develops the functional requirements based on Project-directed changes, including incorporation of a new design basis waste stream and the applicable elements of Enhanced Design Alternative (EDA)-II, as identified in the ''License Application Design Selection Report'' (CRWMS M&O 1999e), which followed the initial SPA (baseline). The impacts of the EDA-II were almost entirely to the WHB. To meet the EDA-II thermal requirements, hotter fuel would be handled, therefore requiring a fuel-blending pool to be added to the WHB in order to age the hotter he1 at the repository and provide for commercial spent nuclear fuel (CSNF) blending. In addition to EDA-II recommendations, the waste stream was modified, including the elimination of approximately 300 multi-purpose canisters from the CSNF schedule. The bases for the Monitored Geologic Repository (MGR) surface design changes, as a result of the waste stream changes, are defined in ''Calculations from Surface Facilities Operations in Support of the Revision to the Waste Quantity, Mix, and Throughput Study'' (CRWMS M&O 2000c, Section 2.4). This effort resulted in a reduction in the number of canister transfer lines from 2 to 1. In addition, as indicated in ''WITNESS Model Input for Thermal Blending of Commercial Spent Nuclear Fuel Assemblies'' (CRWMS M&O 19991), the quantity of dual-purpose canisters (DPCs) assumed to be shipped to the repository has been reduced by about 37 percent. This change resulted in a reduction of the number of Assembly Transfer System (ATS) lines in the WHB from 3 to 2. In summary, this analysis is intended to provide a preliminary level of design showing room square footages and heights associated with the WHB and WTB. These spatial dimensions are anticipated to increase or decrease as the design progresses.

  18. Recommendation 183: Preferred Alternative for the Removal of Hexavalent Chromium

    Broader source: Energy.gov [DOE]

    The ORSSAB Recommendation to DOE on the Preferred Alternative for the Removal of Hexavalent Chromium.

  19. Staff summary of Issues & Recommendations Ocean, Estuary and Plume

    E-Print Network [OSTI]

    and nearshore ocean as critical habitat in the lifecycle of anadromous fish. Various entities recommended

  20. Risk Assessment Technical Expert Working Group (RWG) Conference Call Minutes, March 8, 2010

    Broader source: Energy.gov [DOE]

    Risk Assessment Technical Experts Working Group Charter – The steeringcommittee discussed the draft charter. Two recommended changes were agreed upon:• A sentence will be added to identify that the...

  1. Recommended Underground Test Area Activity Reference Documents

    National Nuclear Security Administration (NNSA)

    Site, Nevada, DOENV--478-Rev. 1, July 1999. (15033) o Addendum, CAIP for CAU98, June, 2001, DOENV-478, Rev.1-ADD (789217) o Corrective Action Investigation Plan for Corrective...

  2. Fermilab at Work | Work Resources

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.New Mexico Feb. 13, 2013 NAME:Job Opportunities JoinWork Resources

  3. 6 Management Plan 6.1.1 Introduction

    E-Print Network [OSTI]

    management). The management plan is made up of six components: 1) the vision for the subbasin; 2) the working management is used to respond to the outcomes of these "tests" of "working hypotheses." Hypotheses192 6 Management Plan 6.1.1 Introduction Emphasis in this management plan is placed on selected

  4. Energy planning and management plan

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  5. LCLS Undulator Test Plan

    SciTech Connect (OSTI)

    Wolf, Zachary

    2010-11-24T23:59:59.000Z

    This note presents the test plan for the LCLS undulators. The undulators will be measured and tuned in the Magnetic Measurement Facility at SLAC. The requirements for tuning are well established and are summarized. A brief discussion of the measurement equipment is presented. This is followed by the detailed test plan in which each step is enumerated. Finally, the measurement results and storage format are presented. The LCLS consists of 33 undulator segments, hereafter referred to as undulators, plus 6 spares and one reference undulator. The undulators must be tuned to meet strict requirements. They must also be fiducialized to allow alignment with other components. This note details the plan for tuning and fiducializing the LCLS undulators. The note begins with the list of tuning and fiducialization requirements. The laboratory in which the work will be performed and the relevant equipment is then briefly described. This is followed by a detailed test plan in which all the steps of tuning and fiducialization are enumerated.

  6. 5 Management Plan The management plan described in this section is a culmination of extraordinary efforts by the

    E-Print Network [OSTI]

    work together to "derive" and establish the key elements of the Management Plan. Assessment290 5 Management Plan The management plan described in this section is a culmination as a laborious result of carrying out the assessment and inventory work and formation of the vision, goals

  7. Plan Your School Visit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Your School Visit For Teachers Teachers Visit the Museum We Visit You Teacher Resources Home Schoolers Plan Your School Visit invisible utility element Plan Your School Visit...

  8. Climate VISION: Private Sector Initiatives: Iron and Steel: Work...

    Office of Scientific and Technical Information (OSTI)

    Institute (AISI) has developed a work plan based on AISI's commitment letter and the Climate Challenge Program which addresses the overall elements of the Climate VISION program...

  9. WISCONSIN CITIES WORK TOGETHER TO ADVANCE UPGRADES | Department...

    Energy Savers [EERE]

    of the Me2 and Green Madison programs to ensure all processes, resources, and tools were working as planned before delving into a larger effort. Marketing tactics included...

  10. Energy Conservation in Multifamily Housing: Review and Recommendations for Retrofit Programs

    E-Print Network [OSTI]

    Diamond, Richard

    Energy Conservation in Multifamily Housing: Review and Recommendations for Retrofit Programs John identified as a particularly challenging area for energy conservation efforts. Much work has been done as a book on multifamily energy conservation. Here we preview key results from that project, with a focus

  11. Learning sustainable metropolitan development for european students of planning

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 Learning sustainable metropolitan development for european students of planning Serrano José, project assessment, sustainable developement, team work Introduction Metropolitan areas are experiencing ways which are more sustainable than others. In our planning training, we teach sustainable development

  12. Solar Magnetic Tracking. I. Software Comparison and Recommended Practices

    E-Print Network [OSTI]

    C. E. DeForest; H. J. Hagenaar; D. A. Lamb; C. E. Parnell; B. T. Welsch

    2007-04-23T23:59:59.000Z

    Feature tracking and recognition are increasingly common tools for data analysis, but are typically implemented on an ad-hoc basis by individual research groups, limiting the usefulness of derived results when selection effects and algorithmic differences are not controlled. Specific results that are affected include the solar magnetic turnover time, the distributions of sizes, strengths, and lifetimes of magnetic features, and the physics of both small scale flux emergence and the small-scale dynamo. In this paper, we present the results of a detailed comparison between four tracking codes applied to a single set of data from SOHO/MDI, describe the interplay between desired tracking behavior and parameterization of tracking algorithms, and make recommendations for feature selection and tracking practice in future work.

  13. Plans, Updates, Regulatory Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stewardship Environmental Protection Obeying Environmental Laws Individual Permit Documents Individual Permit: Plans, Updates, Regulatory Documents1335769200000Plans...

  14. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  15. REFLEXIVE COLLISION RESPONSE WITH VIRTUAL SKIN Roadmap Planning Meets Reinforcement Learning

    E-Print Network [OSTI]

    Förster, Alexander

    REFLEXIVE COLLISION RESPONSE WITH VIRTUAL SKIN Roadmap Planning Meets Reinforcement Learning Svizzera italiana, CH-6928 Manno-Lugano Keywords: Roadmap Planning: Reinforcement Learning: Collision to a changing environment, but not both. This work proposes a simple integration of roadmap planning

  16. Disability Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirectionsDirectorateDisability Plans

  17. Vision Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del SolStrengthening aTurbulenceUtilize AvailableMedia1.1 The History of theVision Plan

  18. Plans, Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeeding accessPeptoidLabPhysics Physics Oursources |VisitPlans,

  19. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearch > TheNuclearHomelandMultivariateSiteSeparationsRelevantStrategic Plan

  20. Medical Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |IsLove Your Home andDispositionMechanical R&DMakingMedical Plans

  1. Working Document: Revisions as of July 10, 2001

    E-Print Network [OSTI]

    Wilkins, David E.

    Working Document: Revisions as of July 10, 2001 Multiagent Planning Architecture MPA Version 1 Wrapper and Agent Library . . . . . . . . . . . . . . . . . . . . . . . . . . 9 3.2 Managing Agents i #12;5 Planning-Cell Managers 24 5.1 Meta Planning-Cell Manager

  2. Improving Work Flow Reliability Proceedings IGLC-7 275

    E-Print Network [OSTI]

    Tommelein, Iris D.

    , load, productivity, project planning and control, reliability, throughput, variability. 1 Director driven for speed. The production plans of upstream PUs is one source of information regarding work flow to significantly improve project performance because it allows the application of planning to production. If you

  3. SNL RML recommended dosimetry cross section compendium

    SciTech Connect (OSTI)

    Griffin, P.J.; Kelly, J.G.; Luera, T.F. [Sandia National Labs., Albuquerque, NM (United States)] [Sandia National Labs., Albuquerque, NM (United States); VanDenburg, J. [Science and Engineering Associates, Inc., Albuquerque, NM (United States)] [Science and Engineering Associates, Inc., Albuquerque, NM (United States)

    1993-11-01T23:59:59.000Z

    A compendium of dosimetry cross sections is presented for use in the characterization of fission reactor spectrum and fluence. The contents of this cross section library are based upon the ENDF/B-VI and IRDF-90 cross section libraries and are recommended as a replacement for the DOSCROS84 multigroup library that is widely used by the dosimetry community. Documentation is provided on the rationale for the choice of the cross sections selected for inclusion in this library and on the uncertainty and variation in cross sections presented by state-of-the-art evaluations.

  4. EAC Recommendations for DOE Action Regarding the Race to the...

    Office of Environmental Management (EM)

    the Race to the Top Initiative - June 6, 2013 EAC Recommendations for DOE Action Regarding the Race to the Top Initiative - June 6, 2013 EAC Recommendations for DOE Action...

  5. Evaluation of Profile Injection Attacks In Collaborative Recommender Systems

    E-Print Network [OSTI]

    Schaefer, Marcus

    Evaluation of Profile Injection Attacks In Collaborative Recommender Systems Chad Williams, Runa recommender systems. The open nature of collaborative filtering allows attackers to inject biased profile data identified attack profiles. Second, we analyze the effectiveness of a supervised classification approach

  6. Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

  7. Revised GCFR safety program plan

    SciTech Connect (OSTI)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01T23:59:59.000Z

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed.

  8. Chemical Hygiene and Safety Plan

    SciTech Connect (OSTI)

    Berkner, K.

    1992-08-01T23:59:59.000Z

    The objective of this Chemical Hygiene and Safety Plan (CHSP) is to provide specific guidance to all LBL employees and contractors who use hazardous chemicals. This Plan, when implemented, fulfills the requirements of both the Federal OSHA Laboratory Standard (29 CFR 1910.1450) for laboratory workers, and the Federal OSHA Hazard Communication Standard (29 CFR 1910.1200) for non-laboratory operations (e.g., shops). It sets forth safety procedures and describes how LBL employees are informed about the potential chemical hazards in their work areas so they can avoid harmful exposures and safeguard their health. Generally, communication of this Plan will occur through training and the Plan will serve as a the framework and reference guide for that training.

  9. Venus Technology Plan Venus Technology Plan

    E-Print Network [OSTI]

    Rathbun, Julie A.

    Venus Technology Plan May 2014 #12; ii Venus Technology Plan At the Venus Exploration Survey priorities, and (3) develop a Technology Plan for future Venus missions (after a Technology Forum at VEXAG Meeting 11 in November 2013). Here, we present the 2014 Venus Technology Plan

  10. Material Stabilization Project Management Plan

    SciTech Connect (OSTI)

    SPEER, D.R.

    1999-09-01T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

  11. Geothermal-subsidence research program plan and review

    SciTech Connect (OSTI)

    Goldstein, N.E.; Noble, J.E.; Simkin, T.L.

    1980-09-01T23:59:59.000Z

    The revised Geothermal Subsidence Research Plan (GSRP) presented here is the result of two years of research based on the recommendations of a technical advisory committee and on the DOE/DGE's wish to include specific components applicable to the geopressure resources on the Gulf Coast. This revised plan describes events leading up to FY 1979 and 1980 and the resulting research activities completed for that period. At the time of this writing most of the projects are completed; this document summarizes the accomplishments of the GSRP during FY 1979 and 1980 and includes recommendations for the FY 1981 and 1982 programs.

  12. Recommendation 167: Historic Preservation of the K-25 Building

    Broader source: Energy.gov [DOE]

    The OSSAB Recommendation to DOE on Historic Preservation of the K-25 Building at East Tennessee Technology Park.

  13. Recommendation 201: Cleanup of Tank W1-A

    Broader source: Energy.gov [DOE]

    ORSSAB recommends to DOE specific procedure at Liquid Low-Level Waste Pipelines Northern Characterization Study Area.

  14. Staff summary of Issues and Recommendations The Willamette Subbasin

    E-Print Network [OSTI]

    and Confederated Tribes of Grand Ronde also recommended adopting the ESA delisting goals and the broader goals

  15. TANKS 18 AND 19-F STRUCTURAL FLOWABLE GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS

    SciTech Connect (OSTI)

    Stefanko, D.; Langton, C.

    2011-11-01T23:59:59.000Z

    Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: (1) physically stabilize the final landfill by filling the empty volume in the tanks with a non compressible material; (2) provide a barrier for inadvertent intrusion into the tank; (3) reduce contaminant mobility by (a) limiting the hydraulic conductivity of the closed tank and (b) reducing contact between the residual waste and infiltrating water; and (4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identify a single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: (1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). (2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. (3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. (4) Prepare samples for hydraulic property measurements for comparison to the values in the F and H- Tank Farm Performance Assessments (PAs). (5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification [Forty, 2011 a, b, c]. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP-8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification [Forty 2011 a] and requested admixture recommendations and property confirmation for this formulation [Forty, 2011 b]. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12.

  16. PURDUE EXTENSION Open Space Planning

    E-Print Network [OSTI]

    of runoff from their fields by implementing best manage- ment practices. There is more work to do of direct runoff. Contami- nated storm water can even be filtered through planned open space in the agricultural area with respect to soil erosion and some nutrients, but reduced tillage practices, filter strips

  17. Guidelines for Writing PhD Recommendations Graduate School, Arts

    E-Print Network [OSTI]

    Guidelines for Writing PhD Recommendations Graduate School, Arts Faculty of Arts, University.......................................................................................................... 4 5 September 2008 Revised 4 July 2013 #12;Guidelines for Writing PhD Recommendations, Faculty of Arts, University of Aarhus 1 Guidelines for Writing PhD Recommendations Graduate School, Arts Faculty

  18. Landscape Ecology + Planning NRE 687 Fall 2013

    E-Print Network [OSTI]

    Awtar, Shorya

    Landscape Ecology + Planning NRE 687 ­ Fall 2013 Course Syllabus NRE 687: Landscape Planning in the field of landscape ecology. Hierarchy theory and methods for working across spatial scales. The social mining, collection, and validation Scientific research and application Digital tools, including Arc

  19. CLIMATE ACTION PLAN NOVEMBER 10, 2009

    E-Print Network [OSTI]

    Suzuki, Masatsugu

    CLIMATE ACTION PLAN NOVEMBER 10, 2009 SANDY DEJOHN PHYSICAL FACILITIES DEPARTMENT #12;~ i ~ TABLE the American College and University Presidents Climate Commitment, I believe strongly in working to achieve its helped shape and develop the information contained in this Climate Action Plan: (Names listed

  20. University of Aberdeen Carbon Management Plan

    E-Print Network [OSTI]

    Levi, Ran

    of Aberdeen is committed to reducing its carbon footprint and to playing its part in limiting the worstUniversity of Aberdeen Carbon Management Plan Higher Education Carbon Management Programme working with Page 1 The University of Aberdeen Carbon Management Programme Carbon Management Plan (CMP

  1. Creating More Credible and Likable Travel Recommender Systems: The Influence of Virtual Agents on Travel Recommender System Evaluation

    E-Print Network [OSTI]

    Yoo, Kyung Hyan

    2011-08-08T23:59:59.000Z

    their human users. Thus, it is argued that enhancing the social aspects of travel recommender systems is important to create more persuasive systems. One approach to enhancing the social presence of recommender systems is to use a virtual agent. Current...

  2. Contact | Recommend this newsletter Quarterly news on GTZ's work on energy and climate protection

    E-Print Network [OSTI]

    for East African and German solar industry Africa-EU Energy Partnership ­ High Level Meeting GTZ Energy The International Energy Agency (IEA) and the German Technical Cooperation (GTZ) launched a study on 'Sustainable in Kosovo Solar now! Increasing the share of solar in Kenya's and Tanzania's energy mix: win-win potentials

  3. Designing and Implementing Effective Performance Assurance Plans

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting— covers performance assurance planning and process, including performance-based contracts, and measurement and verification protocols.

  4. National Action Plan on Demand Response

    Broader source: Energy.gov [DOE]

    Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—discusses the National Assessment of Demand Response study, the National Action Plan for Demand Response, and demand response as related to the energy outlook.

  5. Topic 2: Backtracking andTopic 2: Backtracking and Recommended ReadingsRecommended Readings

    E-Print Network [OSTI]

    Stephenson, Ben

    Recommended Readings ·· Chapter 3 from Programming in PrologChapter 3 from Programming in Prolog 2 Searching for the AnswerSearching for the Answer ·· Two notions of correctnessTwo notions of correctness ­­ Logical conjunction shouldn't matter ·· In practice, Prolog searches for an answerIn practice, Prolog searches

  6. Trails Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan 5th Annual Report for FY 2011 (pdf) Trails Management Program Mitigation Action Plan 4th Annual Report for FY 2010 (pdf) General Background Trails Use Survey Summary The...

  7. Hanford Site Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01T23:59:59.000Z

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  8. Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1, data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.

  9. 2030 OCARTS Plan Report

    E-Print Network [OSTI]

    Association of Central Oklahoma Governments

    ......................................Director of Planning & Program Development Pearlie Tiggs................................................................... Community Planner 2030 OCARTS Plan Report Table of Contents PART 1 INTRODUCTION........................................................................ 1 Federal Legislation.......................................................................... 1 Purpose of the Plan Report and Relationship to other Plan Documents............. 3 Organization of the Transportation Planning Process...

  10. 1995-1996 Strategic Plan

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    In a rapidly changing world, effective governmental organizations must anticipate and plan for the future. Nowhere is this more true than in the realm of information generation and dissemination. The Energy Information Administration (EIA) faces a future of great opportunity and also significant challenge. Technological advances are providing opportunities to improve our work processes and the way we serve our customers. This year`s Strategic Plan was developed by an EIA Strategic Planning Group with a membership that spans the entire organization. The Strategic Plan provides both a broad vision and a clear map of EIA`s near-term future. The Strategic Planning Group conducted an analysis of the strengths and weaknesses of EIA as an organization, and of the opportunities and constraints facing EIA in the future. Opportunities exist in the future in technological advances and staff training; constraints lie in federal budget trends and staff demographics. This will require a Strategic Plan that recognizes the need to prioritize services and products across EIA, standardize technology across EIA where possible, lead with fewer layers of management, and be acutely aware of customer needs. Developing and training EIA employees to meet the challenges of rapidly changing technology and decreasing budgets were given high priority.

  11. CEBAF - environmental protection program plan

    SciTech Connect (OSTI)

    NONE

    1995-10-01T23:59:59.000Z

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan.

  12. Targeting Net Zero Energy at Marine Corps Base Kaneohe Bay, Hawaii: Assessment and Recommendations

    SciTech Connect (OSTI)

    Burman, K.; Kandt, A.; Lisell, L.; Booth, S.; Walker, A.; Roberts, J.; Falcey, J.

    2011-11-01T23:59:59.000Z

    DOD's U.S. Pacific Command has partnered with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to assess opportunities for increasing energy security through renewable energy and energy efficiency in Hawaii installations. NREL selected Marine Corps Base Hawaii (MCBH), Kaneohe Bay to receive technical support for net zero energy assessment and planning funded through the Hawaii Clean Energy Initiative (HCEI). NREL performed a comprehensive assessment to appraise the potential of MCBH Kaneohe Bay to achieve net zero energy status through energy efficiency, renewable energy, and electric vehicle integration. This report summarizes the results of the assessment and provides energy recommendations.

  13. Recommendations on Implementing the Energy Conservation Building Code in Rajasthan, India

    SciTech Connect (OSTI)

    Yu, Sha; Makela, Eric J.; Evans, Meredydd; Mathur, Jyotirmay

    2012-02-01T23:59:59.000Z

    India launched the Energy Conservation Building Code (ECBC) in 2007 and Indian Bureau of Energy Efficiency (BEE) recently indicated that it would move to mandatory implementation in the 12th Five-Year Plan. The State of Rajasthan adopted ECBC with minor modifications; the new regulation is known as the Energy Conservation Building Directives – Rajasthan 2011 (ECBD-R). It became mandatory in Rajasthan on September 28, 2011. This report provides recommendations on an ECBD-R enforcement roadmap for the State of Rajasthan.

  14. PLAN100%DIGITAL PLAN100%DIGITAL

    E-Print Network [OSTI]

    en un conjunto d e servicios digitales. RAZONES DEL PLAN: Existe un nú mero importante de institu tos

  15. CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN

    E-Print Network [OSTI]

    Oliver, Douglas L.

    CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Officer Biological (Accident Reports) 2204 Bioengineering 2965 #12;TABLE OF CONTENTS CHEMICAL HYGIENE PLAN (CHP) (4/2007) 1

  16. CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN

    E-Print Network [OSTI]

    Kim, Duck O.

    CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals and Safety Numbers Research Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Human Resources (Accident Reports) 4589 Bioengineering 2965 #12;TABLE OF CONTENTS CHEMICAL HYGIENE PLAN

  17. August 28, 2009 Page 1 2009-2014 Strategic Plan

    E-Print Network [OSTI]

    August 28, 2009 Page 1 2009-2014 Strategic Plan [Note: This Word document is the text copied from the web version at: https://ncar.ucar.edu/documents/strategic-plan/2009/introduction] Table of Contents I's development. Wide involvement in NCAR planning is essential because NCAR's work is collaborative

  18. Planning Health Into Your Meals Unit Preparation Materials and

    E-Print Network [OSTI]

    UNIT 14: Planning Health Into Your Meals Unit Preparation Materials and Facilitator Guide #12; #12;Navigating for Success Planning Health into Your Meals Copyright 2007. Do not reproduce or distribute without ­ Planning Health into Your Meals WHO: Participants and Leaders Up to 12 nutrition educators working

  19. Chemical Hygiene Plan for the MRL TEMPO Facility

    E-Print Network [OSTI]

    Bigelow, Stephen

    1 Chemical Hygiene Plan for the MRL TEMPO Facility March 22, 2013 Update and Revision Table. This Chemical Hygiene Plan (CHP) is intended as a resource for people working in the TEMPO Facility. It contains are in the Executive Summary. Even though this is called a Chemical Hygiene Plan, its scope is not limited to chemical

  20. U.S. OPEN DATA ACTION PLAN May 9, 2014

    E-Print Network [OSTI]

    Schrijver, Karel

    U.S. OPEN DATA ACTION PLAN May 9, 2014 #12;U.S. OPEN DATA ACTION PLAN 1 Licensing As a work.0 Universal Public Domain Dedication. #12;U.S. OPEN DATA ACTION PLAN 2 Introduction Throughout his, improve accountability, and fuel private sector innovation, scientific discovery, and economic growth