Powered by Deep Web Technologies
Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

BEDES Strategic Working Group Recommendations  

Energy.gov (U.S. Department of Energy (DOE))

The BEDES Strategic Working Group Recommendations document is a guide to how the BEDES Dictionary can be brought to market and provide the services for which it was designed.

2

RAP Committee 3-Month Work Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

(where does this fit into the HAB FY2014 Work Plan?) Update on 100-N RIFS and Proposed Plan Rev 0; advice development o Review of recommendations of proposed plans o Draft A ...

3

CFN Ops Plan | Work Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

4

IDAHO WATER USER RECOMMENDATIONS MAINSTEM PLAN  

E-Print Network (OSTI)

IDAHO WATER USER RECOMMENDATIONS ON THE MAINSTEM PLAN COLUMBIA RIVER BASIN FISH AND WILDLIFE PROGRAM SUBMITTED ON BEHALF OF THE COMMITTEE OF NINE AND THE IDAHO WATER USERS ASSOCIATION JUNE 15, 2001 and Flow Augmentation Policy in the Columbia River Basin #12;1 IDAHO WATER USER RECOMMENDATIONS

5

Mon Valley work plan  

Office of Legacy Management (LM)

GWSHP 1.8 GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for Characterization Activities at the Shiprock UMTRA Project Site June 1998 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number UGW-511-0020-01-000 Document Number U0013400 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0013400 Contents DOE/Grand Junction Office Work Plan for Characterization Activities at Shiprock Project Site June 1998 Draft Final Page v Contents Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.0 Introduction .

6

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL  

Office of Legacy Management (LM)

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community Improvement Corporation 720 Mound Road Miamisburg, Ohio 45342-6714 Dear Mr. Bird: The Core Team, consisting of the U.S. Department of Energy Miamisburg Environmental Management Project (DOE-MEMP), U.S. Environmental Protection Agency (USEPA), and the Ohio Environmental Protection Agency (OEPA), appreciates your comments on the Work

7

Implementation Plan, 29 Recommendations of the Protective Force Career  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Plan, 29 Recommendations of the Protective Force Implementation Plan, 29 Recommendations of the Protective Force Career Options Study Group - January 2011 Implementation Plan, 29 Recommendations of the Protective Force Career Options Study Group - January 2011 January 2011 Implementation Plan for the 29 Recommendations of the Protective Force Career Options Study Group The Conference Report of the Fiscal Year 2010 National Defense Authorization Act requests the Secretary of Energy and the Administrator of the National Nuclear Security Administration to develop a comprehensive, Department of Energy (DOE)-wide plan to implement the recommendations of the June 30, 2009, DOE Career Options Study Group report, Enhanced Career Longevity and Retirement Options for DOE Protective Force Personnel. Attached is the response to that request,

8

Work Plans & Manuals | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Plans & Manuals Work Plans & Manuals This list contains audit and inspections manuals and a list of planned reviews to be conducted by the Office of Audits and Inspections....

9

Quality Work Plan Inspection and Monitoring Requirement  

Energy.gov (U.S. Department of Energy (DOE))

Inspection and monitoring requirements for Weatherization Assistance Program's comprehensive Quality Work Plan.

10

PUREX facility preclosure work plan  

SciTech Connect

This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D).

Engelmann, R.H.

1997-04-24T23:59:59.000Z

11

Work Force Planning for Public Power Utilities  

E-Print Network (OSTI)

Work Force Planning for Public Power Utilities: Ensuring Resources to Meet Projected Utilities Need to Do More to Prepare for Their Future Work Force Needs.............................................................................20 #12;ii Work Force Planning for Public Power Utilities #12;1 Work Force Planning for Public Power

12

Recommendations - 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Recommendations Recommendations A member reviews drilling documentation for the NSSAB recommended well Fiscal Year 2012 Recommendation on FY 2013 NSSAB Work Plan 9/17/12 - NSSAB Recommendation 9/20/12 - DOE Response Recommendation on Groundwater Contamination Containment/Removal Options 7/18/12 - NSSAB Recommendation 8/29/12 - DOE Response Recommendation on Need For Frenchman Flat Formal Response Plan 7/18/12 - NSSAB Recommendation 8/29/12 - DOE Response Recommendation on Long-term Monitoring Activities at Closed Industrial Sites 7/18/12 - NSSAB Recommendation 8/22/12 - DOE Response Recommendation on FY 2012 NSSAB Membership Slate of Candidates 5/16/12 - NSSAB Recommendation 6/4/12 - DOE Response Recommendation on Proposed U-233 Disposition at the NNSS 3/21/12 - NSSAB Recommendation

13

Recommended Plan of Study B.S. in Nanoscience  

E-Print Network (OSTI)

Recommended Plan of Study B.S. in Nanoscience Major in Nanoscience Year Fall Semester Spring Semester Freshman Introduction to Nanoscience I (3) Introduction to Nanoscience II (3) Foundations II (3) Linear Algebra (2) Sophomore Nanoscience Research Seminar (1) Nanoscience Research Rotations

Crawford, T. Daniel

14

DNFSB recommendation 94-1 Hanford site integrated stabilization management plan - VOLUMES 1-3  

SciTech Connect

The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE's DNFSB Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. These additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document constitutes the Hanford SISMP. This document includes the planned work scope, costs and schedules for activities at the Hanford site to implement the DNFSB Recommendation 94-1 IPP.

Gerber, E.W.

1996-09-23T23:59:59.000Z

15

Transportation Plan Ad Hoc Working Group | Department of Energy  

Office of Environmental Management (EM)

Transportation Plan Ad Hoc Working Group Transportation Plan Ad Hoc Working Group Transportation Plan Ad Hoc Working Group More Documents & Publications Nuclear Fuel Storage and...

16

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning- June 6, 2013  

Energy.gov (U.S. Department of Energy (DOE))

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning, approved at the June 5-6, 2013 EAC Meeting.

17

UNIVERSITY OF WASHINGTON FALL PROTECTION WORK PLAN  

E-Print Network (OSTI)

UNIVERSITY OF WASHINGTON FALL PROTECTION WORK PLAN ENVIRONMENTAL HEALTH AND SAFETY This Work Plan Environmental Health and Safety, 206-543-0469 Call: or Seattle Fire Department 9-911 Radio Communication Center skylights, window cleaning. PROTECTION METHODS Specify protection methods for workers exposed to fall hazard

Wilcock, William

18

Work Plan - U.S.-India Coal Working Group | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Plan - U.S.-India Coal Working Group Work Plan - U.S.-India Coal Working Group Work Plan - U.S.-India Coal Working Group More Documents & Publications Work Group Telecom...

19

WRAP process area development control work plan  

SciTech Connect

This work plan defines the manner in which the Waste Receiving and Processing Facility, Module I Process Area will be maintained under development control status. This status permits resolution of identified design discrepancies, control system changes, as-building of equipment, and perform modifications to increase process operability and maintainability as parallel efforts. This work plan maintains configuration control as these efforts are undertaken. This task will end with system testing and reissue of field verified design drawings.

Leist, K.L., Fluor Daniel Hanford

1997-02-27T23:59:59.000Z

20

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect

This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMEDs guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A Phase I RFI was completed at WIPP as part of a Voluntary Release Assessment (VRA). The risk-based decision criteria recommended by EPA for the VRA were contained in a proposed Corrective Action rule for SWMUs (EPA, 1990). EPA Region VI has issued new risk-based screening criteria applicable to the WIPP SWMUs and AOCs.

Washington TRU Solutions LLC

2000-02-25T23:59:59.000Z

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DNFSB Recommendation 94-1 Hanford site integrated stabilization management plan, volumes 1 and 2  

SciTech Connect

This document comprises the Hanford Site Integrated Stabilization Management Plan (SISMP). This document describes the DOE`s plans at the Hanford Site to address concerns identified in Defense Nuclear Facilites Safety Board (DNFSB) Recommendation 94-1. This document also identifies plans for other spent nuclear fuel (SNF) inventories at the Hanford Site which are not within the scope of DNFSB Recommendation 94-1 for reference purposes because of their interrelationship with plans for SNF within the scope of DNFSB Recommendation 94-1. The SISMP was also developed to assist DOE in initial formulation of the Research and Development Plan and the Integrated Facilities Plan.

Gerber, E.W.

1996-03-15T23:59:59.000Z

22

MN471018, Work Planning and Control Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

18, Work Planning and Control Manual 18, Work Planning and Control Manual Sponsor: Michael W. Hazen, 4000 Issue Date: January 3, 2007 Revision Date: June 1, 2009 This document is no longer a CPR. This document implements the requirements of Corporate procedure ESH100.1.WPC.1, Plan and Control Work. IMPORTANT NOTICE: A printed copy of this document may not be the document currently in effect. The official version is the online version located on the Sandia Restricted Network (SRN) MN471018 - WORK PLANNING AND CONTROL MANUAL Subject Matter Expert: Brad Elkin; CA Counterpart: Aden Jackson MN471018 Revision Date: June 1, 2009; Replaces Document: October 28, 2008 Implementation Notice: The requirements outlined in this document must be incorporated into approved comprehensive organizational procedures on or before June 30, 2009. New work planned and conducted after June 30, 2009 shall be performed in accordance with this document. Ongoing work, conducted under an existing, current, and approved PHS and TWD (if required), is authorized until the expiration of the applicable PHS, TWD, or June 30, 2010.

23

Weatherization Assistance Program Quality Work Plan Requirements  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance, as well as links to the individual requirements.

24

B Plant Complex preclosure work plan  

SciTech Connect

This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

ADLER, J.G.

1999-02-02T23:59:59.000Z

25

Burn site groundwater interim measures work plan.  

SciTech Connect

This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

2005-05-01T23:59:59.000Z

26

Annual work plan for FY 1990  

SciTech Connect

The Office of Inspector General (OIG) has an overall mission to prevent and detect fraud, waste, and mismanagement in Department of Energy (DOE) programs. As part of its responsibility in accomplishing its mission, the DOE Office of Audits publishes an Annual Work Plan'' in September of each year. The prime focus of the plan is to identify opportunities for audits to enhance the effectiveness, efficiency, and integrity of the DOE's programs and operations. Through this plan, we are able to maximize the effectiveness of our resources and to avoid duplicating audit coverage being provided by other audit groups, such as the US General Accounting Office (GAO) to US Department of Energy programs. Such planning is required by Office of Management and Budget Circular A-73 and DOE Order 2321.1. This work plan, in an effort to more realistically plan the year ahead, moves away from the traditional listing of all audits to be undertaken for the year. Only those audits that are to be carried over from the previous fiscal year and those that are to be started in the first quarter of the new fiscal year will be listed. The balance of time available has been allocated to the major program areas for FY 1990, and new audits will be identified and started during the year based on the knowledge gained from completed or in-process audits. This process represents the beginning of our use of long-term multi-year program strategies.

Not Available

1989-09-30T23:59:59.000Z

27

Contractor Work Planning and Control URS Lessons Learned | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Environmental Management Work Planning and Control Oversight Integration of Safety Culture Attributes into EFCOG Work Planning and Control Guidance Document Lessons...

28

US - Brazil Binational Energy Working Group Joint Action Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US - Brazil Binational Energy Working Group Joint Action Plan US - Brazil Binational Energy Working Group Joint Action Plan brazilactionplan7202010.pdf More Documents &...

29

ClimateWorks-Egypt-Low Carbon Growth Planning Support | Open...  

Open Energy Info (EERE)

REDIRECT ClimateWorks Low Carbon Growth Planning Support Retrieved from "http:en.openei.orgwindex.php?titleClimateWorks-Egypt-LowCarbonGrowthPlanningSupport&oldid553606"...

30

Quality Work Plan Guidelines and Standards Requirement | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Work Plan Guidelines and Standards Requirement an icon of a page The Weatherization Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality...

31

Hanford Advisory Board FY2014 Work Plan - "A" List - Facilitator...  

NLE Websites -- All DOE Office Websites (Extended Search)

the WIPP permits o Regulatory requirements for tank waste retrieval processing. * Work plan development (see draft ORPRL work planning list) Advice PIC, RAP, TWC Public...

32

Climate VISION: Private Sector Initiatives: Magnesium: Work Plans  

Office of Scientific and Technical Information (OSTI)

Work Plans EPA's SF6 Emission Reduction Partnership for the Magnesium Industry in cooperation with the International Magnesium Association has developed a work plan for achieving...

33

Work Planning, Control and Execution | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oversight Conclusion Work Planning, Control and Execution More Documents & Publications DOE Handbook: Implementing Activity-level Work Planning & Control at Nuclear Facilities...

34

FY 1987 current fiscal year work plan  

SciTech Connect

This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

Not Available

1986-12-01T23:59:59.000Z

35

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

36

Recommendations for a Software Quality Assurance Plan for the CMR Facility at LANL  

SciTech Connect

The Nuclear Materials Technology (NMT) organizations 1 and 3 within the Chemical and Metallurgical Research (CMR) facility at the Los Alamos National Laboratory are working to achieve Waste Isolation Pilot Plant (WIPP) certification to enable them to transport their TRU waste to WIPP. This document is intended to provide not only recommendations to address the necessary software quality assurance activities to enable the NMT-1 and NMT-3 organizations to be WIPP compliant but is also meant to provide a template for the final Software Quality Assurance Plan (SQAP). This document specifically addresses software quality assurance for all software used in support of waste characterization and analysis. Since NMT-1 and NMT-3 currently have several operational software products that are used for waste characterization and analysis, these software quality assurance recommendations apply to the operations, maintenance and retirement of the software and the creation and development of any new software required for waste characterization and analyses.

Adams, K.; Matthews, S. D.; McQueen, M. A.

1998-10-01T23:59:59.000Z

37

Climate VISION: Private Sector Initiatives: Aluminum: Work Plans  

Office of Scientific and Technical Information (OSTI)

Work Plans The Aluminum Association has finalized its work plan with the collaboration of EPA. The plan describes actions the industry intends to take to achieve its Climate VISION...

38

Blackout 2003: Electric System Working Group Technical Conference- Comments and Recommendations  

Energy.gov (U.S. Department of Energy (DOE))

December 16, 2003 Electric System Working Group Technical Conference, Philadelphia PA - Summary of comments and recommendations relating to the aftermath of the August 2003 blackout.

39

Work Plan Guidelines and Standards Requirement | Department of...  

Energy Savers (EERE)

Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality home energy upgrades. The plan includes a Guidelines and Standards requirement...

40

CRAD, Work Controls Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Controls Assessment Plan Work Controls Assessment Plan CRAD, Work Controls Assessment Plan Performance Objective: Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed. Criteria: Work planning addresses applicable laws, codes and regulations. Work planning includes operational configuration constraints; material, tool, and manpower requirements; inter-organizational coordination; operational history; special training; safety considerations; hazards protection requirements; post-maintenance testing; quality control requirements; and other considerations as necessary. The work to be accomplished is defined by identifying the existing deficiency and condition; prescribing appropriate approvals; and including

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Intermodal Subgroup Draft Work Plan2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 of 2 Work Plan for the DOE TEC Rail Topic Group Intermodal Sub-Group Status: Active Chair: Melissa Bailey (CSG-NE) DOE Lead: Alex Thrower (OCRWM) Contractor Support: John Smegal (Legin) Start Date: July 17, 2007 Purpose: The purpose of the Transportation External Coordinating (TEC) Working Group's Rail Topic Group (RTG) is to provide stakeholder perspectives and feedback to the Office of National Transportation (ONT) in the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) and Environmental Management (EM) regarding topics of common interest concerning operating practices, logistical constraints, and other rail-related issues affecting the development and deployment of a safe, secure, and efficient system for transporting spent fuel (SNF) and high-level radioactive waste (HLW) to a

42

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Construction Quality Assurance Plan Construction Quality Assurance Plan This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page H-1 Construction Quality Assurance Plan 1.1 Introduction This Construction Quality Assurance Plan supports the implementation of remedial activities at LEHR covered by the Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis. This plan is consistent with and supplements the requirements of the Quality Assurance Project Plan and quality assurance elements covered in Section 7 of the Remedial Design/Remedial Action Work Plan. 1.2 Distribution This plan shall be distributed with the Remedial Design/Remedial Action Work Plan to all

43

2014 Quality Work Plan (QWP) Update | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Quality Work Plan (QWP) Update 2014 Quality Work Plan (QWP) Update This update was given at the 2014 ACI National Home Performance Conference & Trade Show in Detroit, Michigan by...

44

Operational efficiency through resource planning optimization and work process improvement  

E-Print Network (OSTI)

This thesis covers work done at National Grid to improve resource planning and the execution of pipeline construction and maintenance work carried out at the yards. Resource Planning, the art of picking the right jobs for ...

Balwani, Siddharth (Siddharth Vashdev)

2012-01-01T23:59:59.000Z

45

Recommended Academic Plan for Landscape Contracting Major -Design/Build Option (LSCPE/DESGN) Commonwealth Campuses  

E-Print Network (OSTI)

Recommended Academic Plan for Landscape Contracting Major - Design/Build Option (LSCPE Landscape Planning 3 HORT 220 Applications in Landscape Contracting 3 HORT 120 Computer Applications for Landscape Contracting 2 Pest Management Selection (Note A Below) 2-3 EDSGN 010 Introductory Engineering

Guiltinan, Mark

46

Response to Council Staff Recommendations 1 Draft Clearwater Subbasin Plan  

E-Print Network (OSTI)

prioritized by PMU, Clearwater drainages. A synthesis of the components is presented in tabular format in the Management Plan. A. Data and Information Compilation Data and information presented in the Clearwater familiar with the ecological resources of the Clearwater subbasin. Initial data gathering was conducted

47

Methodological utilities for organizing cooperative work process according to ISO 9001 standard recommendations  

E-Print Network (OSTI)

1 Methodological utilities for organizing cooperative work process according to ISO 9001 standard is based on the recommendations of ISO 9001 standard. Classical methods decompose a project into several, the recommendations of the ISO 9001 standard (ISO, 2000) are applied, which define different requirements to control

Paris-Sud XI, Université de

48

DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1  

SciTech Connect

The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE`s Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations.

Gerber, E.W.

1995-10-01T23:59:59.000Z

49

Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)  

SciTech Connect

This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

Not Available

1994-09-01T23:59:59.000Z

50

Oil Independent Oakland Action Plan: Recommendations by the OIO Task Force  

NLE Websites -- All DOE Office Websites (Extended Search)

Oil Independent Oakland Action Plan: Recommendations by the OIO Task Force Oil Independent Oakland Action Plan: Recommendations by the OIO Task Force to the City of Oakland to Reduce its Dependence on Oil Speaker(s): James Lutz Date: March 21, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose To avoid major disruptions anticipated by Peak Oil, the OIO Task Force recommends that the City of Oakland begin making a series of changes to reduce its dependence on oil in both the near term and long term. Many of the changes the Task Force recommends will take many years to implement but will have significant long term benefits that will help the City to avert potentially catastrophic economic, infrastructure and social repercussions. Given the long lead times required to change such things as transportation

51

Evaluation and recommendations for the Department of Energy-Farmers Home Administration small-town energy-planning grant program  

SciTech Connect

DOE funded several small-town energy planning projects, through the Farmer's Home Administration (FmHA) Area Development Assistance Planning Grant Program. DOE intended that this program should: (1) encourage community energy planning and the development of Integrated Community Energy Systems (ICES) and (2) provide a testing ground for the technologies and planning methods developed by its Buildings and Community Systems Division. FmHA intended that the joint program should further the development of rural areas and make DOE expertise available to grant recipients doing energy planning. All grantees under this joint program endeavored to define their local energy problems and to find local solutions. However, the resulting energy cost savings were not always impressive, and generally they were not very well documented. Lack of implementation power, lack of focus, and inability to generate local financial support for projects and further planning were the main reasons for this performance. The lack of sufficient documentation could be the result of DOE's failure to require a standardized and systematic accounting of grantees' accomplishments. The recommended changes in the scope-of-work requirements suggested in this report would cause grantees to focus their energy-planning activities so as to increase local financial support. The appendixes give a standardized format by which grantees would account for the energy savings and production made possible by their planning efforts.

Cannon, T.; Kron, N. Jr.

1980-10-01T23:59:59.000Z

52

DNFSB recommendation 94-1 Hanford site integrated stabilization management plan  

SciTech Connect

In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O`Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE`s baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document is the fifth update of the Hanford SISMP.

McCormack, R.L.

1997-05-07T23:59:59.000Z

53

Recommended Practice: Creating Cyber Forensics Plans for Control Systems  

SciTech Connect

Cyber forensics has been in the popular mainstream for some time, and has matured into an information-technology capability that is very common among modern information security programs. The goal of cyber forensics is to support the elements of troubleshooting, monitoring, recovery, and the protection of sensitive data. Moreover, in the event of a crime being committed, cyber forensics is also the approach to collecting, analyzing, and archiving data as evidence in a court of law. Although scalable to many information technology domains, especially modern corporate architectures, cyber forensics can be challenging when being applied to non-traditional environments, which are not comprised of current information technologies or are designed with technologies that do not provide adequate data storage or audit capabilities. In addition, further complexity is introduced if the environments are designed using proprietary solutions and protocols, thus limiting the ease of which modern forensic methods can be utilized. The legacy nature and somewhat diverse or disparate component aspects of control systems environments can often prohibit the smooth translation of modern forensics analysis into the control systems domain. Compounded by a wide variety of proprietary technologies and protocols, as well as critical system technologies with no capability to store significant amounts of event information, the task of creating a ubiquitous and unified strategy for technical cyber forensics on a control systems device or computing resource is far from trivial. To date, no direction regarding cyber forensics as it relates to control systems has been produced other than what might be privately available from commercial vendors. Current materials have been designed to support event recreation (event-based), and although important, these requirements do not always satisfy the needs associated with incident response or forensics that are driven by cyber incidents. To address these issues and to accommodate for the diversity in both system and architecture types, a framework based in recommended practices to address forensics in the control systems domain is required. This framework must be fully flexible to allow for deployment into any control systems environment regardless of technologies used. Moreover, the framework and practices must provide for direction on the integration of modern network security technologies with traditionally closed systems, the result being a true defense-in-depth strategy for control systems architectures. This document takes the traditional concepts of cyber forensics and forensics engineering and provides direction regarding augmentation for control systems operational environments. The goal is to provide guidance to the reader with specifics relating to the complexity of cyber forensics for control systems, guidance to allow organizations to create a self-sustaining cyber forensics program, and guidance to support the maintenance and evolution of such programs. As the current control systems cyber security community of interest is without any specific direction on how to proceed with forensics in control systems environments, this information product is intended to be a first step.

Eric Cornelius; Mark Fabro

2008-08-01T23:59:59.000Z

54

Library Web Standards Recommendations of the SCIS Web Standards Working Group  

E-Print Network (OSTI)

Library Web Standards Recommendations of the SCIS Web Standards Working Group Prepared by L. Jacobs, J. Head, L. Steinke (1997 February 8) Revised by Web Page Working Group, a sub of the Library. Goals of Library Web Pages: To facilitate access to Library resources To supplement access

Seldin, Jonathan P.

55

Presentation to the EAC - Smart Grid Subcommittee Work Plan Status...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Advisory Committee Smart Grid Subcommittee Work Plan Status Joe Paladino - DOE Wanda Reder - EAC Smart Grid Sub- Committee Chair June 12, 2012 * Considerations: - Build...

56

WPN 15-4 Quality Work Plan Requirement Update  

Energy Savers (EERE)

WEATHERIZATION PROGRAM NOTICE 15-4 EFFECTIVE DATE: October 21, 2014 SUBJECT: Quality Work Plan Requirement Update PURPOSE: This guidance provides updates to WPN 14-4 issued...

57

Hanford Advisory Board Fiscal Year 2015 Interim Work Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Advisor Nina Menard, Ecology Action: Public Involvement Presentation by DOE-RL RAP Hanford Advisory Board Fiscal Year 2015 Interim Work Plan Adopted by consensus September 5,...

58

Site Visit Report - Independent Oversight Review of Work Planning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

representatives participate in daily work planning meetings; and instituting Conduct of Operations training for front line managers and Facility Managers. PRS also began...

59

Integration of Safety Culture Attributes into EFCOG Work Planning...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Work Planning and Control Guidance Document May 15, 2013 Presenters: Steele Coddington, NSTec, Las Vegas, and John McDonald, WRPS, Hanford Topics Covered: Integration of Safety...

60

NSF Astronomy Senior Review Recommendations for NAIC: NAIC Statement and Implementation Plan  

E-Print Network (OSTI)

1 NSF Astronomy Senior Review Recommendations for NAIC: NAIC Statement and Implementation Plan for NAIC. These are: 1. Reduce NSF astronomy division support for Arecibo to $8M over the next 3 years; 2. Schedule the survey programs for 80% of the time used for astronomy on the telescope through 2010; 3

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

MTRG/Ascension Management Plan 2002 SECTION 5: THREATS AND RECOMMENDED MANAGEMENT  

E-Print Network (OSTI)

MTRG/Ascension Management Plan 2002 14 SECTION 5: THREATS AND RECOMMENDED MANAGEMENT and control of pet cats 8) Continuation of ban on harvest of turtle products We give an account of all threats.1 General Habitat Degradation 5.1.1. Mining of Beach Sand 5.1.2. Light Pollution 5.1.3 Threat of Fuel Spill

Exeter, University of

62

Recommended Academic Plan for Landscape Contracting Major -Design/Build Option (LSCPE/DESGN) University Park  

E-Print Network (OSTI)

Recommended Academic Plan for Landscape Contracting Major - Design/Build Option (LSCPE Sciences may be substituted) 4 HORT 220 Applications in Landscape Contracting 3 B A 250 Small Business Activity (GHA) 1.5 HORT 120 Computer Applications for Landscape Contracting 2 International Cultures (IL

Guiltinan, Mark

63

Recommended Academic Plan for Landscape Contracting Major -Management Option University Park  

E-Print Network (OSTI)

Recommended Academic Plan for Landscape Contracting Major - Management Option University Park Applications for Landscape Contracting 2 B LAW 243 Legal Environment of Business 3 SOILS 101 (GN) Introductory Landscape Plant Establishment and Maintenance 4 HORT 250 Landscape Contracting Design/Build Principles 3

Guiltinan, Mark

64

Recommended Academic Plan for Landscape Contracting Major -Management Option (LSCPE/MGMT) Commonwealth Campuses  

E-Print Network (OSTI)

Recommended Academic Plan for Landscape Contracting Major - Management Option (LSCPE Applications for Landscape Contracting 2 MKTG 220 Introduction to Selling Techniques or AG BM 220 Agribusiness 217 Landscape Soil and Water Management 3 HORT 250 Landscape Contracting Design/Build Principles 3

Guiltinan, Mark

65

DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 2  

SciTech Connect

The Hanford Site Integrated Stabilization Management Plan (SISMP) was developed in support of the US Department of Energy`s (DOE) Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Integrated Program Plan (IPP). Volume 1 of the SISMP identifies the technical scope and costs associated with Hanford Site plans to resolve concerns identified in DNFSB Recommendation 94-1. Volume 2 of the SISMP provides the Resource Loaded Integrated Schedules for Spent Nuclear Fuel Project and Plutonium Finishing Plant activities identified in Volume 1 of the SISMP. Appendix A provides the schedules and progress curves related to spent nuclear fuel management. Appendix B provides the schedules and progress curves related to plutonium-bearing material management. Appendix C provides programmatic logic diagrams that were referenced in Volume 1 of the SISMP.

Gerber, E.W.

1995-10-01T23:59:59.000Z

66

Project Management Plan (PMP) for Work Management Implementation  

SciTech Connect

The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

SHIPLER, C.E.

2000-01-13T23:59:59.000Z

67

Civil Works Planning Overview Civil Works (CW) Planning offers a structured, rational approach to solving water resources  

E-Print Network (OSTI)

and interrelated processes of social, economic, cultural, environmental and political change at every scale from values inherent in any solution and shape recommendations. · CW Planning is a creative process requiring knowledge of water resources laws and regulations, public involvement methods and processes, engineering

US Army Corps of Engineers

68

FY 1999 annual work plan for infrastructure program WBS 6  

SciTech Connect

The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

Donley, C.D.

1998-08-27T23:59:59.000Z

69

Climate VISION: PrivateSector Initiatives: Mining: Work Plans  

Office of Scientific and Technical Information (OSTI)

Work Plans Work Plans The National Mining Association (NMA) will lead the industry effort to produce a work plan in collaboration with DOE and EPA. The plan will include the industry's proposed implementation actions to reduce greenhouse gas emission intensity by 2012 and a schedule for achieving its commitments. The industry group, with the assistance of DOE and EPA, will implement the actions. It is anticipated that the work plan may contain four major components: Element 1: Emission measurement and reporting protocols Emission measurement and reporting protocols relate to various "Actions" of the industry group's Climate VISION letter of intent. Element 2: Identify/implement near-term, cost-effective opportunities The identification and implementation of near-term, cost-effective actions

70

RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington  

SciTech Connect

The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

Not Available

1993-06-01T23:59:59.000Z

71

Microsoft Word - NGNP _Work Plan Final_ - 13-Dec-06 _2_.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan December 13, 2006 December 13, 2006 Battelle Energy Alliance, LLC Contract No. 000 60209 Technical Proposal Work Plan Page - 1 AREVA NP, INC. Work Plan WORK PLAN APPROVAL...

72

Working Together to Save Lives National Weather Service Strategic Plan  

E-Print Network (OSTI)

Working Together to Save Lives National Weather Service Strategic Plan for 2005-2010 #12;i Preface for a broader range of environmental information services. NOAA's National Weather Service (NWS) Strategic Plan strategies, and a list of partners helping us with our activities. An appendix provides metrics NWS uses

73

Work Controls Assessment Plan Assessment Plan Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WORK CONTROLS WORK CONTROLS Assessment Plan Developed By NNSA/Nevada Site Office Facility Representative Division Performance Objective: Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed. Criteria: Work planning addresses applicable laws, codes and regulations. Work planning includes operational configuration constraints; material, tool, and manpower requirements; inter-organizational coordination; operational history; special training; safety considerations; hazards protection requirements; post-maintenance testing; quality control requirements; and other considerations as necessary. The work to be accomplished is defined by identifying the existing

74

Microsoft Word - FY09 Work Plan_External.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

sector sector NSTB National SCADA Test Bed U.S. Department of Energy Office of Electricity Delivery and Energy Reliability DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan (REVISED 07/31/2009) A plan of work for the National Laboratories that form the National SCADA Test Bed: Argonne National Laboratory Idaho National Laboratory Oak Ridge National Laboratory Pacific Northwest National Laboratory Sandia National Laboratories Fiscal Year 2 0 0 9 Work Plan NSTB FY 2009 Work Plan i FOREWORD The Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) created the National SCADA Test Bed (NSTB) program with the mission to reduce the risk of energy disruptions due to cyber attack on control systems. So far the program's projects have

75

Memorandum, NNSA Activity Level Work Planning & Control Processes...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Level Work Planning & Control Processes, January 2006 More Documents & Publications DOE-HDBK-1211-2014 Order Module--DOE G 450.4-1B, INTEGRATED SAFETY MANAGEMENT SYSTEM GUIDE CRAD,...

76

Proper Sustainability: GAP Grant Proposal Work Plan Strategy Webinar  

Office of Energy Efficiency and Renewable Energy (EERE)

In this webinar I will discuss the new GAP grant requirements for tribal environmental programs and strategies for crafting a work plan that focuses on capacity building activities. My goal is to...

77

3.0 Work Planning and Authorization 0913  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Work Planning and Authorization Integrated Safety Management tells us to plan work, analyze the hazards, ensure controls are in place, and obtain authorization before starting work. There are systems in place to help you do these things. Work Planning Before starting a new project, the first step is to think about what will be needed to get the job done: * Project scope and schedule Define what you are trying to accomplish and when it needs to be done. * People How many people and what types of skills will be needed? Do you already have the right people in your work group? Human Resources and AFRD management can help you find the right people. There may be people in other AFRD programs who can help. AFRD often partners with other Divisions (Advanced Light Source, Engineering, Materials Sciences, Environmental Energy

78

Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.  

SciTech Connect

This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

LaFreniere, L. M.; Environmental Science Division

2007-02-02T23:59:59.000Z

79

How to complete an Annual Review of your UC Ready Continuity Plan The campus recommends that departmental continuity plans be reviewed and updated annually.  

E-Print Network (OSTI)

How to complete an Annual Review of your UC Ready Continuity Plan The campus recommends that departmental continuity plans be reviewed and updated annually. The annual review process is straightforward plan is up-to-date, click this tab and mark your annual review complete by entering the requested

Walker, Matthew P.

80

PRE-DESIGN INVESTIGATION WORK PLAN FOR COLDWATER CREEK FROM  

E-Print Network (OSTI)

Formerly Utilized Sites Remedial Action Program #12;#12;REVISION 0 PRE-DESIGN INVESTIGATION WORK PLANREVISION 0 PRE-DESIGN INVESTIGATION WORK PLAN FOR COLDWATER CREEK FROM FROST AVENUE TO ST. DENIS.S. Army Corps of Engineers, St. Louis District Office, Formerly Utilized Sites Remedial Action Program

US Army Corps of Engineers

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Remedial Design/Remedial Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 LMS/LEH/S05822-0.0 This page intentionally left blank LMS/LEH/S05822-0.0 Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page i Contents Abbreviations ................................................................................................................................. iii 1.0 Introduction ........................................................................................................................1-1

82

Audience/Panel Discussion: Sites Lesson Learned about Activity-level Work Planning and Control Using EFCOG Work Planning and Control Guideline  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Donna J. Governor, Deputy Dept Mgr for Planning & Integration, Lawrence Livermore National Laboratory. Lawrence Livermore National Laboratory work planning and control lessons learned and audience/panel discussion on site's lessons learned about Activity-level Work Planning and Control using EFCOG Work Planning and Control Guideline Document.

83

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect

This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

Washington TRU Solutions LLC

2001-02-25T23:59:59.000Z

84

Siberian Chemical Combine laboratory project work plan, fiscal year 1999  

SciTech Connect

The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites` input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves.

Morgado, R.E.; Acobyan, R.; Shropsire, R.

1998-12-31T23:59:59.000Z

85

The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667  

SciTech Connect

One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)

Young, Ralph [Paducah Citizens Advisory Board (United States)] [Paducah Citizens Advisory Board (United States)

2013-07-01T23:59:59.000Z

86

Final work plan for targeted sampling at Webber, Kansas.  

SciTech Connect

This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

LaFreniere, L. M.; Environmental Science Division

2006-05-01T23:59:59.000Z

87

Climate VISION: Private Sector Initiatives: Business Roundtable: Work Plans  

Office of Scientific and Technical Information (OSTI)

Work Plans Work Plans Business Roundtable Logo Business Roundtable is an association of 160 leading CEOs of companies with 4.5 trillion dollars in annual revenue and employing nearly 10 million people. While we are leading the way on many fronts, our commitment to a sustainable future is our top priority. Our work on Climate RESOLVE (Responsible Environmental Steps, Opportunities to Lead by Voluntary Efforts), mobilizes the resources and expertise of the Roundtable member companies behind the goal of enhanced action to control greenhouse gas (GHG) emissions and improve the GHG intensity of the U.S. economy. We are pleased that the vast majority of our members are participating in Climate RESOLVE. A complete list of our Climate RESOLVE members is available on our website.

88

Tank waste remediation system multi-year work plan  

SciTech Connect

The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

Not Available

1994-09-01T23:59:59.000Z

89

E-Print Network 3.0 - action work plan Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

work plan Search Powered by Explorit Topic List Advanced Search Sample search results for: action work plan Page: << < 1 2 3 4 5 > >> 1 The two faces of plan repair Roman van der...

90

Lesson Learned by Savannah River Site Activity-level Work Planning and Control  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Bonnie Barnes, Savannah River Remediation. Work Planning and Control at Savannah River Remediation.

91

FY 95 engineering work plan for the design reconstitution implementation action plan  

SciTech Connect

Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities, a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.

Bigbee, J.D.

1994-11-09T23:59:59.000Z

92

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-02-14T23:59:59.000Z

93

Recommendations - 2007  

NLE Websites -- All DOE Office Websites (Extended Search)

NSSAB Recommendations - Fiscal Year 2007 NSSAB Recommendations - Fiscal Year 2007 A member reviews drilling documentation for the NSSAB recommended well Recommendations For Proposed Well Locations In The Pahute Mesa Area At The Nevada Test Site 9/17/2007 - NSSAB Recommendation Technical Summation version Stakeholder Summation version Spring 2007 SSAB Chairs Letter 6/28/2007 - SSAB Recommendation Letter of Recommendation Regarding Fact Sheet Revisions (Public Outreach, Speaker's Bureau, FFACO and EM Overview) 04/11/2007 - NSSAB Recommendation 03/05/2008 - DOE Response Letter of Recommendation Regarding Fact Sheet Revisions (Waste Management, Environmental Restoration, Planning and Budgeting and Regulatory Requirements) 11/7/2006 - NSSAB Recommendation 2/1/2007 - DOE Response Letter of Appreciation Regarding Review of UGTA Well Recommendation Letter

94

Recommendations - 2008  

NLE Websites -- All DOE Office Websites (Extended Search)

NSSAB Recommendations - Fiscal Year 2008 A member reviews drilling documentation for the NSSAB recommended well Letter of Recommendation Regarding Corrective Action Investigation Plan Phase II for Pahute Mesa 9/29/2008 - NSSAB Recommendation 12/3/2008 - DOE Response Letter of Recommendation Regarding Parameters for the DOE Transportation Study 9/24/2008 - NSSAB Recommendation 11/12/2008 - DOE Response Letter of Recommendation Regarding Using Nevada Content Standards and Developing a Poster Contest 9/24/2008 - NSSAB Recommendation 9/29/2008 - DOE Response Letter of Recommendation Regarding the Nevada Test Site Environmental Impact Statement Supplement Analysis 5/29/2008 - NSSAB Recommendation Letter of Recommendation Regarding Fact Sheet Revisions (Tonopah Test Range)

95

Remedial action work plan for the Colonie site. Revision 1  

SciTech Connect

The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab.

Not Available

1985-08-01T23:59:59.000Z

96

WPN 14-4: Quality Work Plan Requirement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WPN 14-4: Quality Work Plan Requirement WPN 14-4: Quality Work Plan Requirement This guidance describes requirements to support and verify quality work in the Department of...

97

Plutonium-Uranium Extraction (PUREX) facility preclosure work plan  

SciTech Connect

The dangerous waste permit identification number (WA7890008967)was issued by the U.S. Environmental Protection Agency and the Washington State Department of Ecology. This identification number encompasses a number of treatment, storage, and/or disposal units within the Hanford Facility. One of these treatment, storage, and/or disposal units is the PUREX Facility,currently undergoing a phased closure. The PUREX Facility Preclosure Work Plan submittal differs from closure plans previously submitted by the U.S. Department of Energy, Richland Operations Office to the Washington State Department of Ecology,in that the closure process occurs in three distinct phases as part of the decommissioning process (i.e., transition,surveillance and maintenance, and disposition). Final closure will occur during the disposition phase. This phased decommissioning process is implemented because development of a complete closure plan during the transition phase is impractical and future land use determinations have not been identified. The objective of the transition phase is to place the PUREX Facility in a safe configuration with respect to human health and the environment. Following the transition phase activities, the PUREX Facility will begin the surveillance and maintenance phase of 10 or more years until disposition phase activities commence. The closure plan for the PUREX facility will be prepared during the disposition phase. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels. The PUREX Storage Tunnels are an operating storage unit(DOE/RL-94-24).

Bhatia, R.K., Westinghouse Hanford

1996-07-09T23:59:59.000Z

98

STATUS OF SCOPING PLAN RECOMMENDED MEASURES The estimated 2020 greenhouse gas (GHG) emission reductions for measures described in the  

E-Print Network (OSTI)

1 STATUS OF SCOPING PLAN RECOMMENDED MEASURES The estimated 2020 greenhouse gas (GHG) emission. These regulations, which reflect ARB's progress towards reducing statewide GHG emissions, include comprehensive through the use of an updated GHG emission forecast. The updated forecast was developed using average

99

Rad Monioring Subgroup Draft 1 Work Plan 020408  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 of 3 1 of 3 (Draft) Work Plan for the DOE TEC Rail Topic Group Radiation Monitoring Sub-Group Status: Active TEC Stakeholder Leads: Marty Vyenielo (PA/NE Task Force), Cort Richardson (CSG-NE) DOE Lead: Alex Thrower (OCRWM) Contractor Support: John Smegal (Legin) Start Date: October 4, 2007 Purpose: The Transportation External Coordinating (TEC) Working Group's Rail Topic Group (RTG) provides stakeholder perspectives and feedback to the Office of National Transportation (ONT) in the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) and Environmental Management (EM) regarding topics of common interest concerning operating practices, logistical constraints, and other rail-related issues affecting the development and deployment of a safe, secure, and efficient system for

100

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Sample Collection Procedures Sample Collection Procedures This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page E-1 1.0 Sampling Methods Monitoring well samples will be collected according to Standard Operating Procedure 9.1, "Low-Flow Ground Water Sampling with Dedicated Pumps". A sample preparation area will be established adjacent to the well location. The work surface will be covered with plastic sheeting to minimize the potential spread of contamination. The following equipment will be staged in the sample-preparation area: * A spill kit, * Personal protective equipment, * Sample containers, * A decontamination station, * Bailers, * A wastewater drum, * Custody seals, and

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

FY 1992 work plan and technical progress reports  

SciTech Connect

The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

NONE

1992-11-01T23:59:59.000Z

102

Microsoft Word - Sec 999 Annual Plan - FINAL with FACA recommendations _August 13_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2007 1, 2007 DOE/NETL-2007/1294 Provided in Response to Energy Policy Act of 2005 Section 999, Subtitle J 2007 Annual Plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name,

103

DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OE National SCADA Test Bed Fiscal Year 2009 Work Plan DOEOE National SCADA Test Bed Fiscal Year 2009 Work Plan This document is designed to help guide and strengthen the DOEOE...

104

E-Print Network 3.0 - action plan work Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

work Search Powered by Explorit Topic List Advanced Search Sample search results for: action plan work Page: << < 1 2 3 4 5 > >> 1 The two faces of plan repair Roman van der Krogt...

105

2006 EMAB Recommendation Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-01: Develop accountability for the Human Capital Plan. 6-01: Develop accountability for the Human Capital Plan. Recommendation 2006-02: Identify the efforts being made to increase morale and establish a positive work-culture, and expand upon these efforts. Recommendation 2006-03: EM should take steps to develop and institutionalize the Mentoring Program, thereby connecting it to career development. Recommendation 2006-04: EM should promote executive development and increase their efforts to retrain and develop current employees. Recommendation 2006-05: In support of the Human Capital Initiative, EM should develop advanced management training modules and review the DOD's career development processes to devise a suitable, DOE, career-progression path for internal advancement and growth. Such action would strengthen the EM's resources and aid in

106

Office of Secure Transportation Report for Appropriateness of Revisions to the Emergency Planning Hazards Assessment and Protective Action Recommendation Cards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report Number: HIAR-OST-2011-03-04 Site: Office of Secure Transportation (OST) Subject: Office of Independent Oversight's Office of Emergency Management Oversight Independent Activity Report for Appropriateness of Revisions to the Emergency Planning Hazards Assessment and Protective Action Recommendation Cards Dates of Activity: 03/02/2011 - 03/04/2011 Report Preparer: Deborah Johnson Activity Description/Purpose: The Office of Emergency Management Oversight (HS-63) conducted a review of a new revision of the Office of Secure Transportation (OST) emergency planning hazards assessment (EPHA) and protective action recommendation (PAR) cards. The review was conducted at the Headquarters OST Albuquerque Office. The purpose of the visit was to evaluate the

107

Office of Secure Transportation Report for Appropriateness of Revisions to the Emergency Planning Hazards Assessment and Protective Action Recommendation Cards  

NLE Websites -- All DOE Office Websites (Extended Search)

Report Number: HIAR-OST-2011-03-04 Site: Office of Secure Transportation (OST) Subject: Office of Independent Oversight's Office of Emergency Management Oversight Independent Activity Report for Appropriateness of Revisions to the Emergency Planning Hazards Assessment and Protective Action Recommendation Cards Dates of Activity: 03/02/2011 - 03/04/2011 Report Preparer: Deborah Johnson Activity Description/Purpose: The Office of Emergency Management Oversight (HS-63) conducted a review of a new revision of the Office of Secure Transportation (OST) emergency planning hazards assessment (EPHA) and protective action recommendation (PAR) cards. The review was conducted at the Headquarters OST Albuquerque Office. The purpose of the visit was to evaluate the

108

Site observational work plan for the UMTRA Project site at Falls City, Texas  

SciTech Connect

Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

NONE

1995-06-01T23:59:59.000Z

109

Remedial Action Work Plan Amchitka Island Mud Pit Closures  

SciTech Connect

This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

DOE/NV

2001-04-05T23:59:59.000Z

110

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Travel Time Estimates for Constituents of Concern Travel Time Estimates for Constituents of Concern This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page C-1 Table C-1. Estimated Contaminant Migration Travel Time from DOE Areas to Monitoring Wells DOE Area Monitoring Well Distance from DOE Area Boundary to Monitoring Well (feet) Constituent Kd a (ml/g) Retardation factor b (unitless) Estimated Travel Time Range c (years) Domestic Septic System- 1 UCD1-071 15 Aluminum 9.9 55 28 276 Domestic Septic System- 3 UCD1-069 15 Formaldehyde 0.0018 1.0 0.50 5.0 15 Molybdenum 20 111 55 553 15 Nitrate 0 1.0 0.50 5.0 15 Aluminum 9.9 55 28 276 15 Silver 8.3 47 23 233 Domestic Septic System- 4 UCD1-068 60 Selenium 300 1,646 3,293 32,929

111

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Reporting Limits Reporting Limits This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page F-1 Table F-1. Reporting Limits for Monitoring Parameters, DOE LEHR Parameter Method Reference Laboratory Reporting Limit MDL Units Aluminum EPA 6020A CalScience Environmental Lab 10.5 50 µg/L Antimony EPA 6020A CalScience Environmental Lab 1 0.38 µg/L Arsenic EPA 6020A CalScience Environmental Lab 1 0.589 µg/L Barium EPA 6020A CalScience Environmental Lab 1 0.105 µg/L Beryllium EPA 6020A CalScience Environmental Lab 1 0.131 µg/L Cadmium EPA 6020A CalScience Environmental Lab 1 0.266 µg/L Chromium, total EPA 6020A CalScience Environmental Lab 1 0.618 µg/L Cobalt EPA 6020A CalScience Environmental Lab 1 0.14 µg/L

112

Final work plan for targeted investigation at Hilton, Kansas.  

SciTech Connect

This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

LaFreniere, L. M.; Environmental Science Division

2007-08-28T23:59:59.000Z

113

Egypt-ClimateWorks Low Carbon Growth Planning Support | Open...  

Open Energy Info (EERE)

Egypt Northern Africa References LCGP support1 Low Carbon Growth Plans Advancing Good Practice, August 20092 Overview "Achieving development goals depends on enabling poorer...

114

DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1  

SciTech Connect

This document describes the plans of the Hanford Site for the safe interim storage of fissile materials. Currently, spent nuclear fuels reside in storage basins that have leaked in the past and are projected to leak in the future. Other problems in the basins include; sludge from decomposition, degraded cladding of fuel elements, and construction defects which make the basins seismically unsafe. This management plan describes the time and cost that it will take to implement a safe interim storage plan for the fissile materials.

McCormack, R.L.

1995-08-01T23:59:59.000Z

115

Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee  

SciTech Connect

The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

NONE

1995-10-01T23:59:59.000Z

116

Health and Safety Work Plan for Sampling Colloids in Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

This Work Plan/Site Safety and Health Plan (SSHP) and the attached work plan are for the performance of the colloid project at WAG 5. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division (ESD) and associated ORNL environmental, safety, and health support groups. The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.

Marsh, J.D.; McCarthy, J.F.

1994-01-01T23:59:59.000Z

117

Status Update on Action 2a: Implementation Handbook for Activity-level Work Planning and Control  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by James Winter, NA-00-10. DOE Handbook: Implementing Activity-Level Work Planning & Control at Nuclear Facilities. Project Justification Statement submitted 1-29-13, with focus upon improved implementation of WP&C and activity-level work. Provides the background, project plan, and key elements of a new DOE handbook on implementing activity-level work planning and control at DOE nuclear facilities.

118

Hanford Advisory Board FY2014 Work Plan - "A" List - RAP ISSUE...  

NLE Websites -- All DOE Office Websites (Extended Search)

(see draft ORPRL work planning list) Advice PIC, RAP, TWC RAP IMs: Mattson Peltier Heacock Larsen* Pollet Public Understanding of...topic Involving an informed public...

119

Lesson Learned by Lawrence Livermore National Laboratory Activity-level Work Planning and Control  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Donna J. Governor, Lawrence Livermore National Laboratory. Lessons Learned by Lawrence Livermore National Laboratory Activity-Level Work Planning & Control.

120

Review of the Waste Isolation Pilot Plant Work Planning and Control...  

Office of Environmental Management (EM)

Independent Oversight Review of the Waste Isolation Pilot Plant Work Planning and Control Activities April 2013 Office of Safety and Emergency Management Evaluations Office of...

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Site Characterization Work Plan for Gasbuggy, New Mexico  

SciTech Connect

Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities will focus on the surface/shallow subsurface sampling and modeling. Suspected potential contaminants of concern for investigative analysis at the Gasbuggy Site include total petroleum hydrocarbons (diesel- and gasoline-range), volatile organic compounds, semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and radionuclides. The results of this characterization and risk assessment will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-site disposal of contaminated waste which will be presented in a subsequent corrective action decision document.

DOE/NV

2000-12-14T23:59:59.000Z

122

Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution, January 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review of the Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1

123

UDAC Reports and Recommendations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports and Recommendations Reports and Recommendations UDAC Reports and Recommendations September 10, 2013 Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan July 8, 2013 2013 Annual Plan Section 999: 2013 Annual Plan November 2, 2012 Recommendations: Draft 2013 Annual Plan UDAC - Recommendations on Draft 2013 Section 999 Annual Plan August 3, 2012 2012 Annual Plan Section 999: 2012 Annual Plan March 8, 2012 Recommendations: Draft 2012 Annual Plan UDAC - Recommendations on Draft 2012 Section 999 Annual Plan August 1, 2011 2011 Annual Plan Section 999: 2011 Annual Plan April 11, 2011 Recommendations: Draft 2011 Section 999 Annual Plan UDAC Recommendations on Draft 2011 Section 999 Annual Plan December 18, 2009 2010 Annual Plan Section 999: 2010 Annual Plan October 22, 2009 Recommendations: Draft 2010 Section 999 Annual Plan

124

Employment Information for Master of Urban Planning Graduates Working  

E-Print Network (OSTI)

Housing Alliance Baton Rogue, LA Michigan Community Detroit, MI Michigan Suburbs Alliance Detroit, MI of Dallas Dallas, TX City of Detroit Detroit, MI City of Milwaukee Milwaukee, WI City of Portland Portland Maryland State Highway Administration Baltimore, MD Metropolitan Area Planning Council Boston, MA Michigan

Papalambros, Panos

125

Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.  

SciTech Connect

The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

United States. Bonneville Power Administration. Division of Fish and Wildlife.

1988-11-01T23:59:59.000Z

126

DOE OIG Recovery Act Work Plan (FY 2011).xls  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OIG Recovery Act Plan Overview OIG Recovery Act Plan Overview OIG Name: Department of Energy Office of Inspector General OIG Broad Recovery Act Goals: The primary objective of the Office of Inspector General's oversight strategy involves the implementation of a review, evaluation, and investigation protocol designed to assist the Department of Energy in: (1) maximizing the performance and effectiveness of activities related to the Recovery Act; (2) preventing and detecting the fraudulent misuse of Recovery Act funds; and (3) identifying opportunities for cost savings in Recovery Act-related programs. OIG Broad Training and Outreach Recovery Act Goals: Since the passage of the Recovery Act, the Office of Inspector General has initiated an aggressive schedule to provide targeted fraud awareness briefings to

127

Operable Unit 7-13/14 in situ thermal desorption treatability study work plan  

SciTech Connect

This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.

Shaw, P.; Nickelson, D.; Hyde, R.

1999-05-01T23:59:59.000Z

128

Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Rich Davies, Kami Lowry, Mike Schlender, Pacific Northwest National Laboratory (PNNL) and Ted Pietrok, Pacific Northwest Site Office (PNSO). Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development. Work Planning and Control (WP&C) is essential to assuring the safety of workers and the public regardless of the scope of work Research and Development (R&D) activities are no exception.

129

Office of Enterprise Assessments Targeted Review of Work Planning...  

Office of Environmental Management (EM)

that includes thorough understanding of the technical basis for the work and a search for failure modes that can cause accidents to occur. Section 5.3 of Manual 471012...

130

Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution, January 2013  

NLE Websites -- All DOE Office Websites (Extended Search)

Independent Oversight Review of the Independent Oversight Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1

131

Brazil-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Brazil-ClimateWorks Low Carbon Growth Planning Support Brazil-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Brazil-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Brazil South America References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

132

Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning  

Open Energy Info (EERE)

Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Democratic Republic of Congo-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Democratic Republic of Congo Middle Africa References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development

133

Malaysia-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Malaysia-ClimateWorks Low Carbon Growth Planning Support Malaysia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Malaysia-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Malaysia South-Eastern Asia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

134

Guyana-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Guyana-ClimateWorks Low Carbon Growth Planning Support Guyana-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Guyana-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Guyana South America References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

135

Indonesia-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Indonesia-ClimateWorks Low Carbon Growth Planning Support Indonesia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Indonesia-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Indonesia South-Eastern Asia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

136

Papua New Guinea-ClimateWorks Low Carbon Growth Planning Support | Open  

Open Energy Info (EERE)

Papua New Guinea-ClimateWorks Low Carbon Growth Planning Support Papua New Guinea-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Papua New Guinea-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Papua New Guinea Melanesia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development

137

Kenya-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Kenya-ClimateWorks Low Carbon Growth Planning Support Kenya-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Kenya-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Kenya Eastern Africa References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

138

China-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

China-ClimateWorks Low Carbon Growth Planning Support China-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name China-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country China Eastern Asia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

139

2012 Bioenergy Action Plan Prepared by the Bioenergy Interagency Working Group  

E-Print Network (OSTI)

2012 Bioenergy Action Plan Prepared by the Bioenergy Interagency Working Group AUGUST 2012 Edmund G. Brown Jr., Governor #12;Bioenergy Interagency Working Group Julia Levin, Chair, Bioenergy Interagency and the California Energy Commission with input from the Bioenergy Interagency Working Group. This report

140

Work plan addendum for the remedial investigation and feasibility study of the Salmon Site  

SciTech Connect

This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of Energy (DOE) is conducting a focused and phased site characterization as a part, of the RI/FS. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) for evaluating hazardous waste sites on the National Priorities List (NPL). The SS is not listed on the NPL, but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA.

NONE

1995-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Lessons Learned in Optimizing Workers' and Worker Representatives' Input to Work Planning and Control  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Tom McQuiston, Dr. P.H., United Steelworkers - Tony Mazzocchi Center for Health, Safety and Environmental Education. Lessons Learned in Optimizing Workers and Worker Representatives Input in Work Planning and Control.

142

Contractor Work Planning and Control Lessons Learned from DOE and International Projects  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Bob McQuinn; URS Global Management and Operations Services; Frank McCoy and Rick Runnels; URS - Professional Solutions. Contractor Work Planning and Control-URS Lessons Learned.

143

WPN 15-4: QUALITY WORK PLAN REQUIREMENT UPDATE  

Energy.gov (U.S. Department of Energy (DOE))

Effective October 21, 2014: This guidance provides updates to WPN 14-4 issued December 2, 2013. This guidance supersedes 14-4 and describes requirements to support and verify quality work in the Department of Energys (DOE) Weatherization Assistance Program (WAP). It defines what constitutes a quality installation of weatherization measures, outlines how those measures are inspected and validated, and prescribes acceptable training and credentialing of workers.

144

August 17, 2005, Department letter forwarding the Department's implementation plan in response to the Board's recommendation 2005-1, Nuclear Material Packaging  

NLE Websites -- All DOE Office Websites (Extended Search)

August 17,2005 August 17,2005 The Honorable A . J. Eggenberger Chairman Defense Nuclear Facilities Safety Board 625 Indiana Avenue, NW, Suite 700 Washington, D.C. 20004 - 2901 Dear Mr. Chairman: We are pleased to forward the enclosed Implementation Plan (Plan) for the Defense Nuclear Facilities Safety Board's (Board) Recommendation 2005-1, Nuclear Material Packaging. This Plan provides the Department's approach to ensure safe storage and handling of nuclear material at our sites. We appreciate the support provided by the Board and its staff during the development of this Plan. We will keep you informed of our progress in completing the Plan. I have assigned Mr. Richard M. Stark as the responsible manager for ensuring the Plan's successful completion. You may contact Mr. Stark at (301) 903-4407 to answer any

145

February 28, 2006, Department letter reporting completion of NNSA portion of Commitment 23 in the 2004-1 implementation plan, Oversight of Complex, High-Hazard Nuclear Operations, which requires the development of site office action plans to improve the consistency and reliability of work planning and work control at the activity level, including the incorporation of Integrated Safety Management core functions  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington, DC 20585 Washington, DC 20585 February 28, 2006 OFFICE O F THE ADMINISTRATOR The Honorable A. J. Eggenberger Ch a i rm an Defensc Nuclear Facilities Safety Board 625 Indiana Avenue, NW., Suite 700 Washington, D.C. 20004-2901 Dear Mr. Chairman: On Julie 10, 2005, Secretary Bodnian submitted the Department's Iiizplenzentution Plun to Itizpt-ove Oversight qf'Nucleur Operutions in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004- I , Oversight qf Complex, High-Hrrzurd Nucleur Openrtiotzs. Section 5.3 of the Implementation Plan (IP) addresses Revitalizing Integruted SU/i-'ty Munagernent Implementution, and Subsection 5.3.2 addresses Work Plunning mil Work Control ut the Activity Level. Commitment 23 of the 1P requires development of site office action plans to improve the consistency and reliability of work

146

URTAC Reports and Recommendations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports and Recommendations Reports and Recommendations URTAC Reports and Recommendations September 10, 2013 Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan July 8, 2013 2013 Annual Plan Section 999: 2013 Annual Plan November 1, 2012 Recommendations: Draft 2013 Annual Plan URTAC - Recommendations on Draft 2013 Section 999 Annual Plan August 3, 2012 2012 Annual Plan Section 999: 2012 Annual Plan March 8, 2012 Recommendations: Draft 2012 Annual Plan Recommendations: Draft Section 999 2012 Annual Plan August 1, 2011 2011 Annual Plan Section 999: 2011 Annual Plan October 22, 2010 Recommendations: 2011 Annual Plan URTAC - Recommendations on 2011 Section 999 Annual Plan July 16, 2010 URTAC Committee Charter, 2010-2011 2010 - 2011 URTAC Advisory Committee Charter December 18, 2009 2010 Annual Plan

147

Single-shell tank closure work plan. Revision A  

SciTech Connect

In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

NONE

1995-06-01T23:59:59.000Z

148

RISMC ADVANCED SAFETY ANALYSIS WORKING PLAN FY 2015 FY 2019  

SciTech Connect

SUMMARY In this report, the Advanced Safety Analysis Program (ASAP) objectives and value proposition is described. ASAP focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. The set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. As part of the discussion, we have identified three sets of stakeholders, the nuclear industry, the Department of Energy (DOE), and associated oversight organizations. These three groups would benefit from ASAP in different ways. For example, within the DOE complex, the possible applications that are seen include the safety of experimental reactors, facility life extension, safety-by-design in future generation advanced reactors, and managing security for the storage of nuclear material. This report provides information in five areas: 1. A value proposition (why is this important?) that will make the case for stakeholders use of the ASAP research and development (R&D) products. 2. An identification of likely end users and pathway to adoption of enhanced tools by the end-users. 3. A proposed set of practical and achievable use case demonstrations. 4. A proposed plan to address ASAP verification and validation (V&V) needs. 5. A proposed schedule for the multi-year ASAP.

Ronaldo H. Szilard; Curtis L. Smith

2014-09-01T23:59:59.000Z

149

ORSSAB Recommendations & Responses | Department of Energy  

Office of Environmental Management (EM)

to learn about EM successes. September 11, 2014 Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets ORSSAB recommends that DOE include future actions planned in...

150

Lessons Learned at the Nevada National Security Site Implementing the EFCOG Activity-level Work Planning and Control Guide  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Steele Coddington, Work Planning Manager, National Security Technologies, Nevada National Security Site. Lessons Learned Implementing Work Planning & Control. 6 Step Process for improving WP&C.

151

Subject: Biomedical Workforce Sustainability and Diversity Recommendations As part of our SUNY RF initiatives to grow research through recruitment of outstanding  

E-Print Network (OSTI)

Subject: Biomedical Workforce Sustainability and Diversity Recommendations As part of our SUNY RF Plans to Implement Biomedical Workforce Sustainability and Diversity Recommendations On December 6 recent ACD working group reports, the Biomedical Research Workforce Working Group Report

Linsley, Braddock K.

152

R&D Plan for the High Temperature Membrane Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan for the Plan for the High Temperature Membrane Working Group Introduction/Background The High Temperature Membrane Working Group was established to provide a forum for greater interaction in the effort to develop high temperature membranes for PEM fuel cells. The goal of this effort is particularly challenging and requires significant fundamental research and development. The Working Group meets twice a year (immediately before or after the Electrochemical Society meeting) and includes universities, national labs, small business and industry and is open to any interested individual/organization. The first meeting was in October, 2000. Working Group members are listed in Appendix A. This plan was developed to guide the R&D activities of the Working Group. The

153

April 27, 2010, Department letter transmitting revised Implementation Plan for Recommendation 2009-1, Risk Assessment Methodologies at Defense Nuclear Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

April 27, 20 10 April 27, 20 10 The Honorable Peter S. Winokur Chairman Defense Nuclear Facilities Safety Board 625 Indiana Avenue, NW, Suite 700 Washington, DC 20004-294 1 Dear Mr. Chairman: In a letter to the Defense Nuclear Facilities Safety Board dated February 1, 20 10, I reaffirmed our acceptance of Recommendation 2009- 1, Risk Assessment Methodologies at Defense Nuclear Facilities, and committed to several changes to the Department's Plan for implementing the recommendations therein. Enclosed please find the revised Implementation Plan for Defense Nuclear Facilities Safity Board Recommendation 2009-1 that incorporates those changes. I want to express my thanks for your staffs input on this revision and look forward to similar contributions as we revise the Department's Nuclear Safety Policy and implement

154

CSMRI Flood Plain Characterization Work Plan Page 1 November 21, 2006  

E-Print Network (OSTI)

, which was not addressed in the original Site work plan. The scope of work includes vegetation removal Agency in 1997 as part of an Emergency Removal Action under CERCLA. In the vicinity of the site, the 100 if the area qualifies for wetland status and would therefore need additional controls, possibly including a U

155

Ethiopia-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Ethiopia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Ethiopia-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Ethiopia Eastern Africa References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate

156

Mexico-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Mexico-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Mexico-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Mexico Central America References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate

157

Psychology, Social Sciences recommended Spanish and Speech Communication recommended  

E-Print Network (OSTI)

Arkansas Psychology, Social Sciences recommended Spanish and Speech Communication recommended languages, and course work in behavioral sciences UC Irvine Psychology, Spanish are recommended UCLA Courses of Connecticut Social sciences, psychology recommended Florida Florida International Unversity Social Sciences

Hone, James

158

ClimateWorks Low Carbon Growth Planning Support | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Name Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Brazil, China, Democratic Republic of Congo, Egypt, Ethiopia, Guyana, India, Indonesia, Kenya, Malaysia, Mexico, Papua New Guinea South America, Eastern Asia, Middle Africa, Northern Africa, Eastern Africa, South America, Southern Asia, South-Eastern Asia, Eastern Africa, South-Eastern Asia, Central America, Melanesia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to

159

September 2008 EMAB Recommendation Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUMMARY OF RECOMMENDATIONS SUMMARY OF RECOMMENDATIONS Recommendation 2008-12: Develop a strategic communications plan, or roadmap, in preparation for the next administration. Recommendation 2008-13: Expand outreach efforts to build support for, and acceptance of the EM program. Recommendation 2008-14: Update publications and other informational materials that help promote EM's mission. Recommendation 2008-15: Encourage efforts that promote and institutionalize the use of plain language in all communications. Recommendation 2008-16: Develop Standard Operating Policies and Procedures for the Office of Communications and External Affairs. Recommendation 2008-17: Complete the build-out of financial, analytical tools for strategic planning. Recommendation 2008-18:

160

Work Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

to the DOE regarding the following subjects: soil contamination from historic atmospheric nuclear testing, remediation of contaminated facilities used to support historic testing,...

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Long Range Plan Working Group Members | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Long Range Plan Working Group Members Long Range Plan Working Group Members Nuclear Science Advisory Committee (NSAC) NSAC Home Meetings Members Charges/Reports Charter .pdf file (629KB) NP Committees of Visitors NP Home Members Long Range Plan Working Group Members Print Text Size: A A A RSS Feeds FeedbackShare Page Baker, Keith Hampton University Lung, Allison JLAB Beene, Jim ORNL Marx, Jay LBNL Beise, Betsy University of Maryland McLerran, Larry BNL Bland, Les Indiana University Meyer, Curtis Carnegie-Mellon Bond, Peter BNL Milner, Richard MIT Bowles, Tom LANL Moss, Joel LANL Brenner, Daeg Clark University Mueller, Al Columbia Busza, Wit MIT Mueller, Berndt Duke University Cardman, Larry JLAB Natowitz, Joe Texas A&M Casten, Rick Yale University Nazarewicz, Witek Tennessee/ORNL Cates, Gordon University of Virginia Olinto, Angela

162

2007 Long Range Plan Working Group Members | U.S. DOE Office of Science  

NLE Websites -- All DOE Office Websites (Extended Search)

2007 Long Range Plan Working Group Members 2007 Long Range Plan Working Group Members Nuclear Science Advisory Committee (NSAC) NSAC Home Meetings Members Charges/Reports Charter .pdf file (629KB) NP Committees of Visitors NP Home Members 2007 Long Range Plan Working Group Members Print Text Size: A A A RSS Feeds FeedbackShare Page Beise, Elizabeth University of Maryland Merninga, Lia TJNAF Bryman, Douglas TRIUMF Meyer, Curtis Carnegie Mellon University Burrows, Adam University of Arizona Meziani, Zein-Eddine Temple University Cardman, Larry TJNAF Milner, Richard MIT Casten, Richard Yale University Mueller, Berndt Duke University Cates, Gordon University of Virginia Nazarewicz, Witold University of Tennessee Cizewski, Jolie Rutgers University Nitsche, Heino University of California Dean, David ORNL Norris, Margaret LBNL Deshpande, Abhay

163

Sectored Clean-up Work Plan for Housekeeping Category Waste Sites  

SciTech Connect

The Sectored Clean-up Work Plan (SCWP) replaces the Housekeeping Category Corrective Action Unit Work Plan and provides a strategy to be used for conducting housekeeping activities using a sectored clean-up approach. This work plan provides a process by which one or more existing housekeeping category Corrective Action Sites (CASS) from the Federal Facility Agreement and Consent Order and/or non-FFACO designated waste site(s) are grouped into a sector for simultaneous remediation and cleanup. This increases effectiveness and efficiencies in labor, materials, equipment, cost, and time. This plan is an effort by the U.S. Department of Energy to expedite work in a more organized and efficient approach. The objectives of this plan are to: Group housekeeping FFACO CASS and non-FFACO housekeeping sites into sectors and remediate during the same field visit; Provide consistent documentation on FFACO CAS and non-FFACO clean-up activities; Perform similar activities under one approved document; Remediate areas inside the Deactivation and Decommissioning facilities and compounds in a campaign-style remediation; and Increase efficiencies and cost-effectiveness, accelerate cleanups, reduce mobilization, demobilization, and remediation costs.

S. J. Nacht

2000-02-01T23:59:59.000Z

164

December 27, 2011, Department letter transmitting the Implementation Plan for Board Recommendation 2011-1, Safety Culture at the Waste Treatment and Immobilization Plant.  

NLE Websites -- All DOE Office Websites (Extended Search)

December 27,2011 December 27,2011 The Honorable Peter S. Winokur Chairman Defense Nuclear Facilities Safety Board 625 Indiana Avenue, NW, Suite 700 Washington, DC 20004 Dear Mr. Chairman: Enclosed is the Depmiment of Energy's (DOE's) Implementation Plan (IP) for Defense Nuclear Facilities Safety Board (Board) Recommendation 2011-1, Safety Culture at the Waste Treatment and Immobilization Plant (WTP). On June 30, 20 II, the Department accepted Recommendation 20 Il-l in a letter to the Board, which was published in the Federal Register. On August 12,2011, the Board sought additional clarification about this acceptance, and on September 19,2011, I transmitted clarification to the Board, which was also published in the Federal Register. The IP provides DOE's approach to address the Board's three sub-recommendations

165

December 5, 2012, Deparment letter transmitting the Implementation Plan for Recommendation 2012-1, Savannah River Site Building 235-F Safety.  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington, DC 20585 Washington, DC 20585 December 5, 2012 The Honorable Peter S. Winokur Chairman Defense Nuclear Facilities Safety Board 625 Indiana Avenue NW, Suite 700 Washington, DC 20004 Dear Mr. Chairman: Enclosed is the Department of Energy's (DOE) Implementation Plan (IP) for the Defense Nuclear Facilities Safety Board's (Board) Recommendation 2012-1, Savannah River Site Building 235-F Sq(et identifing the Depatiment's actions to reduce the hazards

166

Draft Level 1 Remedial Investigation Work Plan: 316-3 waste disposal trenches  

SciTech Connect

This work plan describes the work to be performed for the initial level of site characterization for the 316.3 Trenches at the Hanford Site. This initial site characterization effort will include a review of existing environmental contamination data for the 300 Area as well as collection and analysis of environmental samples to better characterize subsurface contamination at the site. 7 refs., 10 figs., 7 tabs.

Not Available

1987-09-01T23:59:59.000Z

167

University of Glasgow Carbon Management Programme Carbon Management Plan working with  

E-Print Network (OSTI)

carbon vision 11 2.3 Strategic themes 12 Targets and objectives 13 3 Emissions Baseline and Projections. Professor Anton Muscatelli, Principal Foreword from the Carbon Trust Cutting carbon emissions as partUniversity of Glasgow Carbon Management Programme Carbon Management Plan working with Page 1 Carbon

Mottram, Nigel

168

Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2  

SciTech Connect

The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site.

Not Available

1994-09-01T23:59:59.000Z

169

Presentation to the EAC - Smart Grid Subcommittee Work Plan Status - Joe Paladino & Wanda Reder  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid Subcommittee Smart Grid Subcommittee Work Plan Status Joe Paladino - DOE Wanda Reder - EAC Smart Grid Sub- Committee Chair June 12, 2012 * Considerations: - Build from resulting from ARRA SGIG/SGDP project results that were awarded ~two years ago - EAC Smart Grid Sub-Committee role defined in the 2007 Energy Independence and Security Act * Approach: - Met with DOE in January 2012, May 2012 - Conference calls and iterations with Committee and DOE staff - Participated in Peer Review - Build upon DOE activity underway * Philosophy: - Work closely with DOE staff to find ways for EAC to add value - User priorities to focus efforts throughout 2012 2012 Smart Grid Work Plan Approach SGIG Spending EPRI Estimate Brattle Group Estimate $7.9 billion with cost share to be spent through 2015

170

SAFETY COMMITTEE ANNUAL PLAN TEMPLATE The safety committee and the unit administration work together in promoting the unit's safety and  

E-Print Network (OSTI)

SAFETY COMMITTEE ANNUAL PLAN TEMPLATE The safety committee and the unit administration work together in promoting the unit's safety and health efforts. The Safety Committee Annual Plan provides. Supervisors can review the plan with new employees during their safety orientation. 3. Safety committee

Collins, Gary S.

171

Executive function processes: inhibition, working memory, planning and attention in children and youth with Attention Deficit Hyperactivity Disorder  

E-Print Network (OSTI)

This study examines the roles of inhibition, attention, working memory, and planning in youth with and without ADHD. As conceptualized in theories of attention, inhibition, and working memory, difficulties with these executive processes interact...

Wolfe, Monica Eileen

2006-04-12T23:59:59.000Z

172

Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan  

SciTech Connect

The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

Nielsen, T. (EG and G Rocky Flats, Inc., Golden, CO (USA)); Waage, E.; Miller, D. (Stoller (S.M.) Corp., Boulder, CO (USA))

1990-01-01T23:59:59.000Z

173

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

SciTech Connect

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

174

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

SciTech Connect

his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

175

Review of the Waste Isolation Pilot Plant Work Planning and Control Activities, April 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review of the Independent Oversight Review of the Waste Isolation Pilot Plant Work Planning and Control Activities April 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1 4.0 Methodology......................................................................................................................................... 2

176

Site Visit Report - Independent Oversight Review of Work Planning/Execution and the Employee Concerns Program at Paducah, March 20105-10.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Site Visit Report - Review of Work Planning/Execution and the Employee Concerns Program at Paducah - March 2010 This report documents the results of a review activity performed by the Office of Health, Safety and Security (HSS) in support of the Department of Energy Office of Environmental Management (EM). The purpose of the review was to support EM management efforts to resolve issues and enhance planned corrective actions for worker safety concerns expressed by several safety professionals at the Paducah Plant. The review was conducted by the Office of Health Safety and Security with an EM observer during the week of February 8, 2010. Observations and recommendations resulting from this review were discussed with representatives of EM's Environmental Management Safety

177

Book Review: Radiological Conditions in the Dnieper River Basin: Assessment by an International Expert Team and Recommendations for an Action Plan  

SciTech Connect

This article is a book review of a report from the International Atomic Energy Agency that was prepared by a team of scientists from Belarus, the Russian Federation, and Ukraine as an assessment of radiological contamination of the Dnieper River, which flows through these three countries. The topics covered begin with radioactive sources (actual and potential) including areas affected by the Chernobyl nuclear accident, nuclear power plants along the river and its tributaries, uranium mining and ore processing, radioactive waste storage and disposal sites, and non-power sources, such as medicine, industry, and research. The report continues with an assessment of human exposures to radiation from these sources. An additional area of consideration is radiological hot spots in the region. The report finishes with conclusions and recommendations to the regional governments for a strategic action plan and individual government national plans.

Napier, Bruce A.

2007-12-31T23:59:59.000Z

178

September 26, 2011, Department letter transmitting the Implementation Plan for Board Recommendation 2010-1, Safety Analysis Requirements for Defining Adequate Protection for the Public and the Workers.  

NLE Websites -- All DOE Office Websites (Extended Search)

September 26, 2011 September 26, 2011 The Honorable Peter S. Winokur Chairman Defense Nuclear Facilities Safety Board 625 Indiana Avenue, NW, Suite 700 Washington, DC 20004-2941 Dear Mr. Chairman: Enclosed is the Department of Energy's Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2010-1, Safety Analysis Requirements for Defining Adequate Protection for the Public and the Workers. This Plan provides the Department's approach for updating its Documented Safety Analysis Standards and requirements to clarify them in regards to performance of hazard and accident analysis and the identification of safety controls. I have assigned Dr. James B. O'Brien, Acting Director, Office of Nuclear Safety in the Office of Health, Safety and Security, as the Department's Responsible

179

Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas  

SciTech Connect

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

MCCARTHY, M.M.

1999-08-01T23:59:59.000Z

180

Recommendation 188: Long-Term Stewardship Implementation | Department...  

Energy Savers (EERE)

ORSSAB offers Recommendations and Comments on the Long-Term Stewardship Implementation Plan for the DOE Oak Ridge. Recommendation 188 DOE response to recommendation 188 More...

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

The NIAC Convergence of Physical and Cyber Technbologies and Related Security Management Challenges Working Group Final Report and Recommendations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

T T T H H E E N N I I A A C C C C O O N N V V E E R R G G E E N N C C E E O O F F P P H H Y Y S S I I C C A A L L A A N N D D C C Y Y B B E E R R T T E E C C H H N N O O L L O O G G I I E E S S A A N N D D R R E E L L A A T T E E D D S S E E C C U U R R I I T T Y Y M M A A N N A A G G E E M M E E N N T T C C H H A A L L L L E E N N G G E E S S W W O O R R K K I I N N G G G G R R O O U U P P F F I I N N A A L L R R E E P P O O R R T T A A N N D D R R E E C C O O M M M M E E N N D D A A T T I I O O N N S S B B Y Y T T H H E E C C O O U U N N C C I I L L J J A A N N U U A A R R Y Y 1 1 6 6 , , 2 2 0 0 0 0 7 7 MARGARET E. GRAYSON WORKING GROUP CO-CHAIR PRESIDENT GRAYSON AND ASSOCIATES GREGORY PETERS WORKING GROUP CO-CHAIR MANAGING PARTNER COLLECTIVE IQ GEORGE CONRADES WORKING GROUP CO-CHAIR EXECUTIVE CHAIRMAN AKAMAI TECHNOLOGIES TABLE OF CONTENTS I. ACKNOWLEDGEMENTS.........................................................................................1 Working Group Members:

182

RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1  

SciTech Connect

The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

NONE

1995-09-01T23:59:59.000Z

183

July 12, 2006, Department letter forwarding the Department's revised implementation plan in response to the Board's recommendation 2004-2, Active Confinement Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 2 , 2 0 0 6 The Honorable A. J. Eggenberger Chairman Defense Nuclear Facilities Safety Board 625 Indiana Avenue, NW, Suite 700 Washington, D.C. 20004 - 2901 Dear Mr. Chairman: Enclosed is a revised Department of Energy (DOE) Implementation Plan (IP) in response to the Defense Nuclear Facilities Safety Board Recommendation 2004-2, Active Conjinement Systems. The changes in Revision 1 of the IP are summarized in the "Background" section of Revision 1. This revision establishes a phased-in schedule for several commitments relating to confinement systems in the DOE complex. This phased-in schedule reflects an increased understanding of the time and resources that are needed at several DOE sites to effectively review new and existing facility active confinement ventilation systems

184

Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2  

SciTech Connect

This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ``scores`` and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process.

Dail, J.L.; Nanstad, L.D.; White, R.K.

1995-06-01T23:59:59.000Z

185

Microsoft Word - Security TG Work Plan 8-7-06.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7/2006 7/2006 Page 1 of 5 WORK PLAN FOR THE DOE TEC SECURITY TOPIC GROUP (STG) Status: Active DOE Leads: Office of Civilian Radioactive Waste Management (OCRWM), Office of Logistics Management (OLM), Alex Thrower Start Date: September 21, 2004 Purpose: The purpose of the Security Topic Group (STG) is to assist the Office of Civilian Radioactive Waste Management (OCRWM) in developing an approach for effective safeguards and security of nuclear waste shipments to Yucca Mountain, Nevada. This approach will incorporate best practices and lessons learned from previous domestic and international nuclear waste shipments, with special emphasis on substantive contributions from the State, Tribal, and local governments that will be involved in these shipments.

186

Remedial Investigation Work Plan for J-Field, Aberdeen Proving Ground, Maryland  

SciTech Connect

The purpose of an RI/FS is to characterize the nature and extent of the risks posed by contaminants present at a site and to develop and evaluate options for remedial actions. The overall objective of the RI is to provide a comprehensive evaluation of site conditions, types and quantities of contaminants present, release mechanisms and migration pathways, target populations, and risks to human health and the environment. The information developed during the RI provides the basis for the design and implementation of remedial actions during the FS. The purpose of this RI Work Plan is to define the tasks that will direct the remedial investigation of the J-Field site at APG.

Benioff, P.; Biang, R.; Dolak, D.; Dunn, C.; Haffenden, R.; Martino, L.; Patton, T.; Wang, Y.; Yuen, C.

1995-03-01T23:59:59.000Z

187

Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska  

SciTech Connect

This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e disposal of contaminated waste. The results of this evaluation will be presented in a subsequent corrective action decision document.

DOE /NV

2001-03-12T23:59:59.000Z

188

Work plan for conducting an ecological risk assessment at J-Field, Aberdeen Proving Ground, Maryland  

SciTech Connect

The Environmental Management Division of Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation and feasibility study (RI/FS) of the J-Field area at APG pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. J-Field is within the Edgewood Area of APG in Harford County, Maryland, and activities at the Edgewood Area since World War II have included the development, manufacture, testing, and destruction of chemical agents and munitions. The J-Field site was used to destroy chemical agents and munitions by open burning and open detonation. This work plan presents the approach proposed to conduct an ecological risk assessment (ERA) as part of the RI/FS program at J-Field. This work plan identifies the locations and types of field studies proposed for each area of concern (AOC), the laboratory studies proposed to evaluate toxicity of media, and the methodology to be used in estimating doses to ecological receptors and discusses the approach that will be used to estimate and evaluate ecological risks at J-Field. Eight AOCs have been identified at J-Field, and the proposed ERA is designed to evaluate the potential for adverse impacts to ecological receptors from contaminated media at each AOC, as well as over the entire J-Field site. The proposed ERA approach consists of three major phases, incorporating field and laboratory studies as well as modeling. Phase 1 includes biotic surveys of the aquatic and terrestrial habitats, biological tissue sampling and analysis, and media toxicity testing at each AOC and appropriate reference locations. Phase 2 includes definitive toxicity testing of media from areas of known or suspected contamination or of media for which the Phase 1 results indicate toxicity or adverse ecological effects. In Phase 3, the uptake models initially developed in Phase 2 will be finalized, and contaminant dose to each receptor from all complete pathways will be estimated.

Hlohowskyj, I.; Hayse, J.; Kuperman, R. [Argonne National Lab., IL (United States). Environmental Assessment Div.] [and others

1995-03-01T23:59:59.000Z

189

What Is the Plan Commission  

E-Print Network (OSTI)

What Is the Plan Commission & How Does It Work? Purdue University Cooperative Extension Service valuable to the community and to its elected and appointed officials. Plans and proposals from individuals- nance, and a subdivision ordinance. They also make recommendations to elected officials on proposed

190

Report: EM Strategic Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STRATEGIC PLANNING STRATEGIC PLANNING September 25, 2008 Submitted by the EMAB Strategic Planning Subcommittee Background In Fiscal Year (FY) 2008, the Environmental Management Advisory Board (EMAB) was tasked to assess EM's strategic planning capabilities/processes and, in particular, to review the status of the initiatives pursued by the Office of Strategic Planning and Analysis (EM-32). This charge was derived from the Board's work pertaining to the topics of Discretionary Budgeting and Technical Uncertainty and Risk Reduction, which were addressed in previous reports and recommendations to the Assistant Secretary. The EMAB Strategic Planning Committee was formed to expand on this earlier work and pursue dialogues with the EM Office of Program Planning and Budget (EM-30) in

191

* This reference number refers to the recommendation number given in the EPSRC/STFC Review of Nuclear Physics and Nuclear Engineering Report Action Plan for the EPSRC/STFC Review of Nuclear Physics and Nuclear Engineering  

E-Print Network (OSTI)

of Nuclear Physics and Nuclear Engineering Report Action Plan for the EPSRC/STFC Review of Nuclear Physics and Nuclear Engineering Preface This document will outline the recommendations in order of importance skills provision in nuclear engineering and related areas. Although these two areas have significant

192

Collaborative future event recommendation  

E-Print Network (OSTI)

We demonstrate a method for collaborative ranking of future events. Previous work on recommender systems typically relies on feedback on a particular item, such as a movie, and generalizes this to other items or other ...

Minkov, Einat

193

Recommendations to the NRC on acceptable standard format and content for the Fundamental Nuclear Material Control (FNMC) Plan required for low-enriched uranium enrichment facilities  

SciTech Connect

A new section, 10 CFR 74.33, has been added to the material control and accounting (MC A) requirements of 10 CFR Part 74. This new section pertains to US Nuclear Regulatory Commission (NRC)-licensed uranium enrichment facilities that are authorized to produce and to possess more than one effective kilogram of special nuclear material (SNM) of low strategic significance. The new section is patterned after 10 CFR 74.31, which pertains to NRC licensees (other than production or utilization facilities licensed pursuant to 10 CFR Part 50 and 70 and waste disposal facilities) that are authorized to possess and use more than one effective kilogram of unencapsulated SNM of low strategic significance. Because enrichment facilities have the potential capability of producing SNM of moderate strategic significance and also strategic SNM, certain performance objectives and MC A system capabilities are required in 10 CFR 74.33 that are not contained in 10 CFR 74.31. This document recommends to the NRC information that the licensee or applicant should provide in the fundamental nuclear material control (FNMC) plan. This document also describes methods that should be acceptable for compliance with the general performance objectives. While this document is intended to cover various uranium enrichment technologies, the primary focus at this time is gas centrifuge and gaseous diffusion.

Moran, B.W.; Belew, W.L. (Oak Ridge K-25 Site, TN (United States)); Hammond, G.A.; Brenner, L.M. (21st Century Industries, Inc., Gaithersburg, MD (United States))

1991-11-01T23:59:59.000Z

194

ASU Graduate College : Letter Of Recommendation https://webapp4.asu.edu/gradlor/preview.jsp?acad_plan=SUSUSTPHD[8/25/2011 1:08:51 PM  

E-Print Network (OSTI)

LastName Company Name: Test Company Email Address: email@email.com Job Title: Phone Number: Recommender Recommendation File Upload Test Job Title Sr. 5551212 0 0 Search ASU Search #12;ASU Graduate College : Letter

Hall, Sharon J.

195

Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas  

SciTech Connect

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

ROGERS, P.M.

2000-06-01T23:59:59.000Z

196

Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)  

SciTech Connect

Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

2002-01-14T23:59:59.000Z

197

Site Characterization Work Plan for Gnome-Coach Site, New Mexico  

SciTech Connect

Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

DOE/NV

2001-02-13T23:59:59.000Z

198

Integrated Program of Experimental Diagnostics at the NNSS: An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability  

SciTech Connect

This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3?year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

NSTec Mission and Projects Division

2010-09-30T23:59:59.000Z

199

Old hydrofracture facility tanks contents removal action operations plan at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2: Checklists and work instructions  

SciTech Connect

This is volume two of the ORNL old hydrofracture facility tanks contents removal action operations plan. This volume contains checklists and work instructions.

NONE

1998-05-01T23:59:59.000Z

200

Work plan for the remedial investigation/feasibility study-environmental assessment for the Colonie site, Colonie, New York  

SciTech Connect

This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes of human exposure to site containments, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. This work also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 48 refs., 18 figs., 25 tabs.

Not Available

1990-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

NASA Advisory Council Subcommittee Recommendation  

E-Print Network (OSTI)

for Space Exploration may have become blurred during the lunar exploration architecture planning process for Space Exploration Short description of the proposed Recommendation The PSS recommends that the NAC take.g., international or commercial participation, individual state involvement) to undertake robotic exploration

Rathbun, Julie A.

202

Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002)  

SciTech Connect

Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities will focus on the surface/shallow subsurface sampling and deep subsurface modeling. Suspected potential contaminants of concern for investigative analysis at the Gasbuggy Site include total petroleum hydrocarbons (diesel- and gasoline-range), volatile organic compounds, semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and radionuclides. The results of this characterization and risk assessment will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-site disposal of contaminated waste which will be presented in a subsequent corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

2002-01-25T23:59:59.000Z

203

R&D Plan for the High Temperature Membrane Working Group  

Energy.gov (U.S. Department of Energy (DOE))

Summary of challenges, approaches and technical targets for HFCIT's High Temperature Membrane Working Group.

204

work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE THE U.S. DEPARTMENT OF ENERGY'S WORKING CAPITAL FUND U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES OCTOBER 1998 AUDIT REPORT CR-B-99-01 MEMORANDUM FOR THE DIRECTOR, BUSINESS MANAGEMENT STAFF FROM: William S. Maharay Acting Manager, Capital Regional Audit Office, Office of Inspector General SUBJECT: INFORMATION : Audit Report on the Department's Working Capital Fund BACKGROUND The Department established the Working Capital Fund (Fund) in January 1996 as a financial management tool for charging the costs of common services provided at Headquarters to Departmental program offices. The objectives in establishing the Fund were to increase efficiency of the Department's operations, improve management of administrative services

205

Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety and Security Safety and Security Report to the Secretary on the Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1 February 2011 Office of Health, Safety and Security U.S. Department of Energy Office of Health, Safety and Security HSS Table of Contents 1.0 Introduction ......................................................................................................................... 1 2.0 Department-wide Action Plan for the Columbia Accident and Davis-Besse Event ........... 3 3.0 Comprehensive Operating Experience Program ................................................................. 5

206

Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety and Security Safety and Security Report to the Secretary on the Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1 February 2011 Office of Health, Safety and Security U.S. Department of Energy Office of Health, Safety and Security HSS Table of Contents 1.0 Introduction ......................................................................................................................... 1 2.0 Department-wide Action Plan for the Columbia Accident and Davis-Besse Event ........... 3 3.0 Comprehensive Operating Experience Program ................................................................. 5

207

Solyndra Credit Committee Recommendation | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Recommendation Jan 2009 Solyndra Credit Committee.pdf More Documents & Publications Open Government Plan 1.0 Fiscal Year 2010 Agency Financial Report Web Improvement Strategy...

208

Sandia Site Office Assessment of Activity-Levell Work Planning and Control at Sandia National Laboratories/New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SNL-2011-02-18 SNL-2011-02-18 Site: Sandia National Laboratories (SNL) Subject: Office of Independent Oversight's Office of Environment, Safety and Health Evaluations Independent Activity Report for the Sandia Site Office Assessment of Activity-Level Work Planning and Control at Sandia National Laboratories /New Mexico (SNL) Dates of Activity : 02/14/2011 - 02/18/2011 Report Preparer: Patricia Williams Activity Description/Purpose: At the request of the Sandia Site Office (SSO), the Office of Environment, Safety and Health Evaluations (HS-64) personnel participated in an SSO assessment of SNL's Activity-Level Work Planning and Control processes, procedures, and implementation by line organizations, including feedback and improvement activities and efforts to sustain the

209

21st Century jobs initiative - building the foundations for a 21st Century economy. Appendix A, cluster working group initiative business plans  

SciTech Connect

The business and community leaders who participated in a four-month long series of working groups developed business plans for initiatives which would lead to further growth and competitiveness of each of the industrial clusters. This appendix contains those business plans as they stood at the end of the working group session mid-September, 1995.

NONE

1995-11-01T23:59:59.000Z

210

U.S. Virgin Islands Transportation Petroleum Reduction Plan  

Office of Energy Efficiency and Renewable Energy (EERE)

This report, funded by DOE and prepared by EDINs Transportation Working Group (TWG), aims to build on the 2030 USVI Transportation Master Plan by describing how its recommended projects can be leveraged toward the 60% by 2025 goal.

211

Liquid effluents 1994 fiscal year work plan: WBS 1.2.2.1  

SciTech Connect

The program mission is to manage current and future liquid effluent streams in a safe, responsible, cost effective and legally compliant manner. This is achieved through planning and integration, public and stakeholder interaction, definition of requirements for generators and provision of timely treatment, storage, disposal capability, and waste minimization of waste streams where applicable.

Ashworth, F.L. Jr.

1993-08-01T23:59:59.000Z

212

Energy Storage Safety Strategic Plan Now Available  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Electricity Delivery and Energy Reliability (OE) has worked with industry and other stakeholders to develop the Energy Storage Safety Strategic Plan, a roadmap for grid energy storage safety that highlights safety validation techniques, incident preparedness, safety codes, standards, and regulations. The Plan also makes recommendations for near- and long-term actions.

213

Recommendation 215: Recommendation on Remaining Legacy Materials...  

Office of Environmental Management (EM)

5: Recommendation on Remaining Legacy Materials on the Oak Ridge Reservation Recommendation 215: Recommendation on Remaining Legacy Materials on the Oak Ridge Reservation The board...

214

Recommendation 199: Recommendation to Remove Uncontaminated Areas...  

Office of Environmental Management (EM)

9: Recommendation to Remove Uncontaminated Areas of the Oak Ridge Reservation from the National Priorities List Recommendation 199: Recommendation to Remove Uncontaminated Areas of...

215

DynCorp Tricities Services, Inc. Hanford fire department FY 1998 annual work plan  

SciTech Connect

The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the U.S. Department of Energy operated Hanford site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. This fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This plan provides a program overview, program baselines, and schedule baseline.

Good, D.E.

1997-08-19T23:59:59.000Z

216

NORTHWEST ENERGY EFFICIENCY TASKFORCE REPORT AND RECOMMENDATIONS FOR THE EXECUTIVE COMMITTEE'S  

E-Print Network (OSTI)

DRAFT NORTHWEST ENERGY EFFICIENCY TASKFORCE REPORT AND RECOMMENDATIONS FOR THE EXECUTIVE COMMITTEE Efficiency IV. Planning that Puts Energy Efficiency First V. The NEET Mission and Work Groups VI. Work Group. Introduction The push for energy efficiency in the Pacific Northwest is facing an unprecedented opportunity

217

OXY (Occidental Petroleum Corp. ) units plan U. K. work worth $1. 5 billion  

SciTech Connect

Occidental Refineries Ltd., an Occidental Petroleum Corp. subsidiary, plans to spend about $500,000 to build a 60,000 bbl/day hydrocracker on Canvey Island near London to produce aviation fuel, naphtha, and gasoline. Occidental hopes to deflect criticism by environmentalists, concerned about the concentration of petroleum facilities in the area, by installing a minimum amount of LPG storage and not using hydrogen sulfide on the site. During the 1970's, Occidental had prepared the site for the construction of a 125,000 bbl/day refinery, plans for which were scrapped after the demand for product compounds decreased. Occidental Chemical Co., another Occidental Petroleum subsidiary, plans to spend about $500,000 to build a 300,000 ton/yr ethylene plant at Peterhead, Scotl. The cracker would take part of the output from the de-ethanizer at the St. Fergus terminal for the proposed U.K. gas-gathering pipeline. Both projects would require about 3-4 yr to complete. Esso Chemical Ltd. will build a 550,000 ton/yr ethylene plant near the Mossmoran gas liquids plant in Fife, Scotl.

Not Available

1980-09-15T23:59:59.000Z

218

Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

NONE

1996-03-01T23:59:59.000Z

219

Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington  

SciTech Connect

Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

Not Available

1992-09-01T23:59:59.000Z

220

Research Cloud Computing Recommendations  

E-Print Network (OSTI)

Research Cloud Computing Recommendations SRCPAC December 3, 2014 #12;Mandate and Membership SRCPAC convened this committee in Sept 2014 to investigate the role that cloud computing should play in our & Academic Affairs (Social Work) #12;Questions discussed · What cloud resources are available? · Which kinds

Qian, Ning

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Nelson, L. O.

2007-06-12T23:59:59.000Z

222

NRC Recommendations  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis Analysis & Systems Integration For DOE Hydrogen R & D Messages from the Academies Hydrogen Study, Personal Experience Robert L. Hirsch Senior Energy Program Advisor, SAIC July 28, 2004 SAIC 2 Topics Academies findings / recommendations + Systems analysis & integration both needed Hydrogen's competition in the marketplace Hydrogen options varied / breakthroughs needed Academies study wide-ranging but limited Differences in systems analysis & system integration 3 ACADEMIES HYDROGEN STUDY COMPREHENSIVE CHALLENGING SUPPORTIVE OF DOE 4 ACADEMIES FINDINGS ACADEMIES FINDINGS Pathway to H 2 not straightforward Exploratory research is essential Extensive R&D needed Issues: Economic, social, & public acceptance, especially safety Hydrogen program management is far more

223

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

D. Vandel

2003-09-01T23:59:59.000Z

224

Waste management project fiscal year 1998 multi-year work plan WBS 1.2  

SciTech Connect

The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

Slaybaugh, R.R.

1997-08-29T23:59:59.000Z

225

2011 University of Vermont Combined Research and Extension Plan of Work Status: Submitted  

E-Print Network (OSTI)

Extension address issues ranging from farm profitability, water and soil quality, and dairy herd disease resistance and health, to global climate change, renewable energy, youth life skills education, community and adult life-skills development. Our work is guided and evaluated by dedicated citizen advisors

Hayden, Nancy J.

226

Activity-level Work Planning and Control in the Hanford Site Worker Evaluation Tool  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Ted Giltz, Volpentest HAMMER Federal Training Center. Hanford Site Worker Eligibility Tool, Verifying Activity-Level Worker Medical Clearance and Training. The Hanford Site Worker Eligibility Tool (HSWET) provides line management an easy to use tool to determine if workers are medically cleared and trained to perform work safely.

227

Status Update on Action 2c: Criteria Review and Approach Document (CRAD) for Performing Assessments of Activity-level Work Planning and Control  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Bradley K. Davy, Director, Office of Worker Safety and Health Assistance, HS. Criteria Review and Approach Document (CRAD) for Performing Assessments of Activity- Level Work Planning and Control. DOE CRAD Development Approach.

228

Engineering Work Plan for Development of Sludge Pickup Adapter for Fuel Cleanliness Inspections  

SciTech Connect

The plan for developing an adapter to suction up sludge into a calibrated tube for fuel cleanliness inspection activities is described. A primary assessment of fuel cleanliness to be performed after processing through the Primary Cleaning Machine is whether the volume of any remaining canister sludge in or on a fuel assembly exceeds the allowable 14 cm{sup 3} limit. It is anticipated that a general visual inspection of the sludge inventory after fuel assembly separation will usually suffice in making this assessment, but occasions may arise where there is some question as to whether or not the observed quantity of sludge exceeds this limit. Therefore a quantitative method of collecting and measuring the sludge volume is needed for these borderline situations. It is proposed to develop an adapter that fits on the end of the secondary cleaning station vacuum wand that will suction the material from the sludge collection tray into a chamber marked with the limiting volume to permit a direct go/no-go assessment of the sludge quantity.

PITNER, A.L.

2000-01-06T23:59:59.000Z

229

Hanford fire department FY 99 annual work plan WBS 6.5.7  

SciTech Connect

The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing a full range of services at the lowest possible cost to customers. These services include fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, the general public, or interest of the U. S. Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. The fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education.

GOOD, D.E.

1999-02-24T23:59:59.000Z

230

Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2  

SciTech Connect

The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

Jacobsen, P.H.

1997-09-23T23:59:59.000Z

231

Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 25, 2007 May 25, 2007 Kevin Kolevar Director of the Office of Electricity Deliverability and Energy Reliability Department of Energy 1000 Independence Ave., SW Washington, DC 20585 Dear Mr. Kolevar, DOE has requested that Pepco provide an update on the current work to install two new 230 kilovolt circuits into Potomac River substation and to evaluate the need for generation from the Potomac River plant to support the anticipated line outage during June, 2007. An outage on one of the 230 kV circuits is currently underway and is currently scheduled to be completed by June 2, 2007. Mirant has supported this outage with generation required to match the Potomac River area load from the substation. This has required the operation of all 5 generating units located at

232

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV  

SciTech Connect

This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

R. P. Wells

2006-11-14T23:59:59.000Z

233

Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee  

SciTech Connect

The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

SAIC

2011-04-01T23:59:59.000Z

234

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III  

SciTech Connect

The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

R. P. Wells

2006-09-19T23:59:59.000Z

235

Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland  

SciTech Connect

The purpose of the feasibility study is to gather sufficient information to develop and evaluate alternative remedial actions to address contamination at J-Field in compliance with the NCP, CERCLA, and SARA. This FS Work Plan summarizes existing environmental data for each AOC and outlines the tasks to be performed to evaluate and select remedial technologies. The tasks to be performed will include (1) developing remedial action objectives and identifying response actions to meet these objectives; (2) identifying and screening remedial action technologies on the basis of effectiveness, implementability, and cost; (3) assembling technologies into comprehensive alternatives for J-Field; (4) evaluating, in detail, each alternative against the nine EPA evaluation criteria and comparing the alternatives to identify their respective strengths and weaknesses; and (5) selecting the preferred alternative for each operable unit.

Benioff, P.; Biang, C.; Haffenden, R.; Goyette, M.; Martino, L.; Patton, T.; Yuen, C.

1995-05-01T23:59:59.000Z

236

Final work plan : phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Montgomery City, Missouri.  

SciTech Connect

From September 1949 until September 1966, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) leased property at the southeastern end of Montgomery City, Missouri, for the operation of a grain storage facility. During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In January 2000, carbon tetrachloride was detected in a soil sample (220 {micro}g/kg) and two soil gas samples (58 {micro}g/m{sup 3} and 550 {micro}g/m{sup 3}) collected at the former CCC/USDA facility, as a result of a pre-CERCLIS site screening investigation (SSI) performed by TN & Associates, Inc., on behalf of the U.S. Environmental Protection Agency (EPA), Region VII (MoDNR 2001). In June 2001, the Missouri Department of Natural Resources (MoDNR) conducted further sampling of the soils and groundwater at the former CCC/USDA facility as part of a preliminary assessment/site inspection (PA/SI). The MoDNR confirmed the presence of carbon tetrachloride (at a maximum identified concentration of 2,810 {micro}g/kg) and chloroform (maximum 82 {micro}g/kg) in the soils and also detected carbon tetrachloride and chloroform (42.2 {micro}g/L and 58.4 {micro}g/L, respectively) in a groundwater sample collected at the former facility (MoDNR 2001). The carbon tetrachloride levels identified in the soils and groundwater are above the default target level (DTL) values established by the MoDNR for this contaminant in soils of all types (79.6 {micro}g/kg) and in groundwater (5.0 {micro}g/L), as outlined in Missouri Risk-Based Corrective Action (MRBCA): Departmental Technical Guidance (MoDNR 2006a). The corresponding MRBCA DTL values for chloroform are 76.6 {micro}g/kg in soils of all types and 80 {micro}g/L in groundwater. Because the observed contamination at Montgomery City might be linked to the past use of carbon tetrachloride-based fumigants at its former grain storage facility, the CCC/USDA will conduct investigations to (1) characterize the source(s), extent, and factors controlling the possible subsurface distribution and movement of carbon tetrachloride at the Montgomery City site and (2) evaluate the health and environmental threats potentially represented by the contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigations at Montgomery City will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Montgomery City will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Montgomery City investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Montgomery City site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne has issued a Provisional Master Work Plan (PMWP; Argonne 2007) that has been reviewed and approved by the MoDNR for current use. The PMWP (Argonne 2007) provides detailed information and guidance on the investigative technologies, analytical methodologies, qua

LaFreniere, L. M.; Environmental Science Division

2010-08-16T23:59:59.000Z

237

FY 1991 environmental research programs for the Nevada Operations Office: Work plan and quarterly reports, first and second quarter reports  

SciTech Connect

The work carried out on behalf of the DOE by the Desert Research Institute (DRI) includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to stat and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. This document contains the Work Plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-05-01T23:59:59.000Z

238

Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory  

SciTech Connect

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

1993-07-01T23:59:59.000Z

239

Development and Delivery of Ecologically-based IPM Packages in Central Asia Central Asia Regional IPM Program Year 3 Work plans  

E-Print Network (OSTI)

IPM Program ­ Year 3 Work plans (October 1, 2011 ­ September 30, 2012) Project Management Dr. Karim and government institutions. 3. Build institutional capacity through education, training and human resource, and Uzbekistan). This work will include cultural practices, botanicals and biopesticides, biological control

240

Plutonium Vulnerability Management Plan  

SciTech Connect

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Industrial Sites Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (including Record of Technical Change Nos. 1, 2, 3, and 4)  

SciTech Connect

This Leachfield Corrective Action Units (CAUs) Work Plan has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the U.S. Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the U.S. Department of Defense (FFACO, 1996). Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. A work plan may be developed that can be referenced by leachfield Corrective Action Investigation Plans (CAIPs) to eliminate redundant CAU documentation. This Work Plan includes FFACO-required management, technical, quality assurance (QA), health and safety, public involvement, field sampling, and waste management documentation common to several CAUs with similar site histories and characteristics, namely the leachfield systems at the Nevada Test Site (NTS) and the Tonopah Test Range (TT R). For each CAU, a CAIP will be prepared to present detailed, site-specific information regarding contaminants of potential concern (COPCs), sampling locations, and investigation methods.

DOE/NV

1998-12-18T23:59:59.000Z

242

Status and EAC Recommendations for Electricity Delivery Workforce...  

Office of Environmental Management (EM)

and delivered to the Department of Energy, reports on the activities since September 2013 of the Workforce Work Group and makes recommendations to the DOE. The recommendations...

243

FY 1991 environmental research programs for the DOE Field Office, Nevada: Work plan and quarterly reports, fourth quarter report  

SciTech Connect

This research includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which required DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. In accordance with specific contract requirements for each activity, DRI will produce summary, status and final reports and, in some cases, journal articles which will present the results of specific research efforts. This document contains the work plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-10-01T23:59:59.000Z

244

Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington  

SciTech Connect

This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

Not Available

1993-05-01T23:59:59.000Z

245

Quality Work Plan Update  

Energy Savers (EERE)

resources and quality assurance Improving long term sustainability by building the foundation of the national industry with WAP at the core 2 Responding to Network Concerns...

246

Most Commonly Identified Recommendations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Most Commonly Identified Recommendations Most Commonly Identified Recommendations DOE ITP In Depth ITP Energy Assessment Webcast Presented by: Dr. Bin Wu, Director, Professor of Industrial Engineering Dr. Sanjeev Khanna, Assistant Director, Associate Professor of Mechanical Engineering With Contribution From MO IAC Student Engineers: Chatchai Pinthuprapa Jason Fox Yunpeng Ren College of Engineering, University of Missouri. April 16, 2009 Missouri Industrial Assessment Center Missouri IAC is one of the 26 centers founded by the U.S. DOE in the nation. Since its establishment in 2005, we have been working closely with the MoDNR, the MU University Extension, utility providers in the state, etc, to provide education, development and services in industrial energy efficiency. Our services (audits, workshops, etc), have already covered many locations across the state of Missouri.

247

CHARTER INDIAN COUNTRY ENERGY AND INFRASTRUCTURE WORK GROUP  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CHARTER CHARTER INDIAN COUNTRY ENERGY AND INFRASTRUCTURE WORK GROUP Official Designation Indian Country Energy and Infrastructure Working Group ("Working Group") Purpose The purpose of the Working Group is to provide advice and recommendations to the Director of the Office of Indian Energy Policy & Programs (OIE) and the Secretary of Energy with respect to the strategic planning and implementation of OIE's energy resource, energy business and energy infrastructure development policy and programs. Objectives and Scope of Activities and Duties The Working Group shall: (a) make recommendations to the Director of the Office of Indian Energy Policy and Programs

248

Comprehensive work plan for Building 3001 storage canal at the Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

This Comprehensive Work Plan describes the method of accomplishment to replace the shielding protection of the water in the canal with a controlled low strength material (CLSM) 4. The canal was used during the operation of the Oak Ridge Graphite Reactor in the 1940s and 1950s to transport spent fuel slugs and irradiated test materials from the reactor, under water to the hot cell in Building 3019 for further processing, packaging, and handling. After the reactor was shut down, the canal was used until 1990 to store some irradiated materials until they could be transferred to a Solid Waste Storage Area. This task has the following objectives and components: (1) minimize potential future risk to human health and the environment; (2) reduce surveillance and maintenance cost of the canal; (3) perform site preparation activities; (4) replace the water in the canal with a solid CLSM; (5) pump the water to the Process Waste Treatment System (PWTS) for further processing at the same rate that the CLSM is pumped under the water; (6) remove the water using a process that will protect the workers and the public in the visitors area from contamination while the CLSM is being pumped underneath the water; (7) painting a protective coating material over the CLSM after the CLSM has cured.

NONE

1997-01-01T23:59:59.000Z

249

FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports  

SciTech Connect

This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.

NONE

1990-11-01T23:59:59.000Z

250

RHIC | NSAC Recommendations  

NLE Websites -- All DOE Office Websites (Extended Search)

Excerpts from the "Report to NSAC on Implementing the 2007 Long Range Excerpts from the "Report to NSAC on Implementing the 2007 Long Range Plan" The full report of a Nuclear Science Advisory Committee (NSAC) subcommittee charged with making recommendations for the field of nuclear physics under constrained budget scenarios and the "transmittal letter" delivering this report from NSAC to the Department of Energy and the National Science Foundation are now available online. Background on the task facing the subcommittee and documents presenting the scientific and economic impact of the research program at the Relativistic Heavy Ion Collider (RHIC) at DOE's Brookhaven National Laboratory, one of three facilities described in detail in the report, can be found on the RHIC website here. What follows are direct quotes taken from the report that help to describe the

251

Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect

Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

Not Available

1993-08-01T23:59:59.000Z

252

Blackout 2003: Electric System Working Group Technical Conference...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric System Working Group Technical Conference - Comments and Recommendations Blackout 2003: Electric System Working Group Technical Conference - Comments and Recommendations...

253

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

H&S Plan Examples H&S Plan Examples Example 46 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity  Hazard control integrated into work processes

254

Work plan for vibration cable re-route and water flush system modifications for 107-AN mixer pump  

SciTech Connect

A mixer pump (75 horsepower Hazleton submersible) is to be installed in the central pump pit of Double-Shell Tank 241-AN-107 for the Caustic Addition Project. The mixer pump will be used as a platform to inject, mix, and entrain caustic with the waste, in order to bring the waste hydroxyl ion concentration into compliance with Tank Farm operating specifications. Testing of the mixer pump and caustic addition system revealed that the mixer pump`s vibration cable picks up electromagnetic interference from the motor power cable during variable speed operation of the pump. Also, it was noted that the mixer pump`s water flush system may not be as effective as desired. Ergo this work plan for improving the operation of these mixer pump subsystems. A new vibration cable shall be routed entirely outside the mixer pump support column pipe, up thru a new penetration in the pump mounting flange. The existing penetration in the side of the pipe is to be plugged. Increasing the distance between power and instrument cables may reduce or eliminate electromagnetic interference to the vibration monitor. The mixer pump water flush system shall be modified to allow pressure isolation of individual branches. A header is to be installed on the middle section of the support column. Each branch (there are three) shall contain a solenoid valve (normally open) to control flow into the branch. The solenoid cables shall be routed up thru three new penetrations in the pump mounting flange to a new electrical box mounted on the flange. The existing flush piping to the inlet screen will remain but the continuation of the flush piping to the pump discharge nozzles is to be removed and the tee plugged. New stainless steel tubing is to be run down to the pump discharge nozzles. Pressure isolation of individual branches will maximize the flush system`s effectiveness at blasting potential sediment clogs out of the pump discharge nozzles.

Leshikar, G.A.

1995-04-14T23:59:59.000Z

255

DOE Responses to EAC Work Products - September 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Responses to EAC Work Products - September 2013 DOE Responses to EAC Work Products - September 2013 DOE Responses to EAC Work Products - September 2013 This memo from Assistant Secretary for Electricity Delivery and Energy Reliability Patricia Hoffman to the Electricity Advisory Committee provides the Department of Energy's response to the EAC's analyses and recommendations made in 2013. The memo and included documentation address EAC recommendations on the following topics: Recommendations on Interconnection-Wide Planning, June 2013 Recommendations on the Race to the Top Initiative, June 2013 Recommendations on Consumer Acceptance of Smart Grid, June 2013 Recommendations on the CSG Interstate Transmission Siting Compact, June 2013 DOE Response to 2013 EAC Work Products - September 2013 More Documents & Publications

256

DOE Responses to EAC Work Products - September 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Responses to EAC Work Products - September 2013 Responses to EAC Work Products - September 2013 DOE Responses to EAC Work Products - September 2013 This memo from Assistant Secretary for Electricity Delivery and Energy Reliability Patricia Hoffman to the Electricity Advisory Committee provides the Department of Energy's response to the EAC's analyses and recommendations made in 2013. The memo and included documentation address EAC recommendations on the following topics: Recommendations on Interconnection-Wide Planning, June 2013 Recommendations on the Race to the Top Initiative, June 2013 Recommendations on Consumer Acceptance of Smart Grid, June 2013 Recommendations on the CSG Interstate Transmission Siting Compact, June 2013 DOE Response to 2013 EAC Work Products - September 2013 More Documents & Publications

257

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

258

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

259

Recommended HSE-7 documents hierarchy  

SciTech Connect

This report recommends a hierarchy of waste management documents at Los Alamos National Laboratory (LANL or ``Laboratory``). The hierarchy addresses documents that are required to plan, implement, and document waste management programs at Los Alamos. These documents will enable the waste management group and the six sections contained within that group to satisfy requirements that are imposed upon them by the US Department of Energy (DOE), DOE Albuquerque Operations, US Environmental Protection Agency, various State of New Mexico agencies, and Laboratory management.

Klein, R.B.; Jennrich, E.A.; Lund, D.M.; Danna, J.G. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States); Davis, K.D.; Rutz, A.C. [Wastren, Inc., Idaho Falls, ID (United States)

1990-12-12T23:59:59.000Z

260

Recommended HSE-7 documents hierarchy  

SciTech Connect

This report recommends a hierarchy of waste management documents at Los Alamos National Laboratory (LANL or Laboratory''). The hierarchy addresses documents that are required to plan, implement, and document waste management programs at Los Alamos. These documents will enable the waste management group and the six sections contained within that group to satisfy requirements that are imposed upon them by the US Department of Energy (DOE), DOE Albuquerque Operations, US Environmental Protection Agency, various State of New Mexico agencies, and Laboratory management.

Klein, R.B.; Jennrich, E.A.; Lund, D.M.; Danna, J.G. (Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)); Davis, K.D.; Rutz, A.C. (Wastren, Inc., Idaho Falls, ID (United States))

1990-12-12T23:59:59.000Z

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

recommendations.xls  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2003 Electric System Working Group Technical Conference, Philadelphia PA 6, 2003 Electric System Working Group Technical Conference, Philadelphia PA Rec Type Recommendations/Comments Name Organization Communication The reliability coordinator needs an understanding from others, from a broad perspective, what's going on. Sometimes you may not have all the information, and this is what happens most times in blackout situations. Michael Calimano New York ISO System Operations Reliability coordination needs to have authority in real time to order actions to be taken by control areas or operators under emergency conditions. Authorities and procedures have to be spelled out well beforehand. Michael Calimano New York ISO Emergency Response We have to look at how we can do this better, how we can let other people know better and faster. In our shop, when there is an emergency going, everybody's involved in

262

Recommendation 221: Recommendation Regarding Recycling of Metals...  

Office of Environmental Management (EM)

recycling program to address radiologically contaminated metals and equipment for free-release. Recommendation 221 Responseto221.pdf More Documents & Publications EM SSAB...

263

Energy Organizational Planning  

SciTech Connect

As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

Gina C. Paradis; James Yockey; Tracey LeBeau

2009-04-17T23:59:59.000Z

264

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan  

SciTech Connect

This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

D. E. Shanklin

2006-06-01T23:59:59.000Z

265

Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge...  

Office of Environmental Management (EM)

Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge Environmental Management Budget Request Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge...

266

RCRA Facility Investigation/Remedial Investigation Work Plan Addendum for the TNX Area Operable Unit Groundwater Radiological Characterization  

SciTech Connect

The purpose of this document is to present a sampling and analysis plan for the Water Table Aquifer for purposes of obtaining additional data for remedial decision-making with respect to radioactive contamination in the groundwater.

Brewer, K.

2002-06-17T23:59:59.000Z

267

Overall Ventilation System Flow Network Calculation for Site Recommendation  

SciTech Connect

The scope of this calculation is to determine ventilation system resistances, pressure drops, airflows, and operating cost estimates for the Site Recommendation (SR) design as detailed in the ''Site Recommendation Subsurface Layout'' (BSC (Bechtel SAIC Company) 2001a). The statutory limit for emplacement of waste in Yucca Mountain is 70,000 metric tons of uranium (MTU) and is considered the base case for this report. The objective is to determine the overall repository system ventilation flow network for the monitoring phase during normal operations and to provide a basis for the system description document design descriptions. Any values derived from this calculation will not be used to support construction, fabrication, or procurement. The work scope is identified in the ''Technical Work Plan for Subsurface Design Section FY01 Work Activities'' (CRWMS M&O 2001, pp. 6 and 13). In accordance with the technical work plan this calculation was prepared in accordance with AP-3.12Q, ''Calculations'' and other procedures invoked by AP-3.12Q. It also incorporates the procedure AP-SI1.Q, ''Software Management''.

Jeff J. Steinhoff

2001-08-02T23:59:59.000Z

268

Nuclear Crisis Communications: The Plan Worked. A Critique of NRC Communications in the Fukushima Daiichi Reactor Crisis - 12073  

SciTech Connect

'Call the AV-Photo folks and get someone in here to shoot b-roll. We'll never be able to accommodate the network cameras and the only way I can get this to the media is to produce it ourselves'. Eliot Brenner, Director NRC Office of Public Affairs, March 12, 2011. For the past four years we have been speaking to audiences at Waste Management about communications issues. Last year, though we were kept from attending because of the federal budget crisis, our surrogates described to you the lessons the nuclear industry should draw from the BP Gulf oil spill crisis. Those remarks were delivered 11 days before the Fukushima Daiichi tragedy became the nuclear landmark of a generation - an industry changing event with worldwide ramifications, both in science and regulation and in communications. Eliot Brenner cut his teeth on crisis communication in the aviation industry where tragedy unfolds rapidly. He has been a speech-writer to three cabinet secretaries, spokesman for the Federal Aviation Administration and now spokesman for the Nuclear Regulatory Commission since 2004. Holly Harrington manages the NRC crisis response program and has 26 years federal public affairs experience, including eight years at the Federal Emergency Management Agency. Her crisis experience includes the 1989 Loma Prieta earthquake, numerous hurricanes and floods, Sept 11, and, now Fukushima Daiichi. Rebecca Schmidt is a veteran government relations professional whose decades in Washington include service with the House Armed Services Committee, the House Budget Committee and the Secretary of Defense. Collectively, the Offices of Public Affairs and Congressional Affairs conducted the largest outreach for the agency since Three Mile Island. We worked with the basic rule, described to Waste Management last year just 11 days before Fukushima - communicate early, often and clearly. The response - while not without its problems and lessons - went as smoothly as a chaotic event like Fukushima could go. That was due in large measure to the fact that the NRC has a well-tested system of responding to nuclear emergencies, and we followed our plan. (authors)

Brenner, Eliot; Harrington, Holly; Schmidt, Rebecca [U.S. Nuclear Regulatory Commission, Rockville, MD 20852 (United States)

2012-07-01T23:59:59.000Z

269

THE DECISION TO RECOMMEND YUCCA MOUNTAIN AND THE NEXT STEPS TOWARD LICENSED REPOSITORY DEVELOPMENT  

SciTech Connect

After more than 20 years of carefully planned and reviewed scientific field work by the U.S. Department of Energy, the U.S. Geological Survey, and numerous other organizations, Secretary of Energy Abraham concluded in January that the Yucca Mountain site is suitable, within the meaning of the Nuclear Waste Policy Act, for development as a permanent nuclear waste and spent fuel repository. In February, the Secretary recommended to the President that the site be developed for licensed disposal of these wastes, and the President transmitted this recommendation to Congress. This paper summarizes key technical and national interest considerations that provided the basis for the recommendation. It also discusses the program's near-term plans for repository development if Congress designates the site.

Barrett, L. H.

2002-02-25T23:59:59.000Z

270

Framework and systematic functional criteria for integrated work processes in complex assets: a case study on integrated planning in offshore oil and gas production industry  

Science Journals Connector (OSTI)

Improving the efficiency and cost-effectiveness of the oil and gas (O&G) production process is considered as a critical timely need. The core work processes in particular are targeted for considerable improvements. In this context, development related to integrated planning (IP) is seen as one of the major bases for developing collaborative work processes connecting offshore production and onshore support system. With feasible benefits, for instance, relating to reduction of non-working time, less work repetition, reduction of reduction in production losses, better resource utilisation, etc., a systematic and a complete IP system is today seen as an attractive solution for integrating complex operations and to work smarter. This paper, based on a case study from North Sea oil and gas production environment, describes the systematic functional criteria required as the basis for developing a fully functional IP system.

Yu Bai; Jayantha P. Liyanage

2012-01-01T23:59:59.000Z

271

FACT SHEET: BIOENERGY WORKING GROUP  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2010 , 2010 1 FACT SHEET: BIOENERGY WORKING GROUP At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers launched a Bioenergy Working Group, which will advance the deployment of bioenergy technologies by implementing recommendations of the Technology Action Plan on Bioenergy Technologies that was released by the Major Economies Forum Global Partnership in December 2009. The Working Group will work in close cooperation with the Global Bioenergy Partnership (GBEP), which is co-chaired by Brazil and Italy. Initial key activities of the Working Group include: 1. Global Bioenergy Atlas: The Working Group will combine and build upon existing databases of sustainably-developed bioenergy potential around the globe and make it available in an open web-

272

Safer Work Plan for CAUs 452, 454, 456, and 464 Closure of Historical UST Release Sites Nevada Test Site  

SciTech Connect

This plan addresses characterization and closure of nine underground storage tank petroleum hydrocarbon release sites. The sites are located at the Nevada Test Site in Areas 2, 9, 12, 23, and 25. The underground storage tanks associated with the release sites and addressed by this plan were closed between 1990 and 1996 by the U. S. Department of Energy, Nevada Operations Office. One underground storage tank was closed in place (23-111-1) while the remaining eight were closed by removal. Hydrocarbon releases were identified at each of the sites based upon laboratory analytical data samples collected below the tank bottoms. The objective of this plan is to provide a method for implementing characterization and closure of historical underground storage tank hydrocarbon release sites.

Jerry Bonn

1997-08-01T23:59:59.000Z

273

Systematic Approach for Decommissioning Planning and Estimating  

SciTech Connect

Nuclear facility decommissioning, satisfactorily completed at the lowest cost, relies on a systematic approach to the planning, estimating, and documenting the work. High quality information is needed to properly perform the planning and estimating. A systematic approach to collecting and maintaining the needed information is recommended using a knowledgebase system for information management. A systematic approach is also recommended to develop the decommissioning plan, cost estimate and schedule. A probabilistic project cost and schedule risk analysis is included as part of the planning process. The entire effort is performed by a experienced team of decommissioning planners, cost estimators, schedulers, and facility knowledgeable owner representatives. The plant data, work plans, cost and schedule are entered into a knowledgebase. This systematic approach has been used successfully for decommissioning planning and cost estimating for a commercial nuclear power plant. Elements of this approach have been used for numerous cost estimates and estimate reviews. The plan and estimate in the knowledgebase should be a living document, updated periodically, to support decommissioning fund provisioning, with the plan ready for use when the need arises.

Dam, A. S.

2002-02-26T23:59:59.000Z

274

Microsoft Word - Overall recommendations final.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

6-8, 2011 6-8, 2011 1. Introduction On June 6, 2011, the PAC heard background information on progress in Run 11, accelerator performance and plans, the PHENIX and STAR Beam Use Requests (BURs) for Runs 12 and 13, and a Beam Use Request for a Drell-Yan measurement at IP2. We also heard reports on the Drell-Yan workshop held at BNL May 11-13 as well as the proposed proton EDM measurement. The discussion on June 7 was focused on the decadal plan documents prepared by STAR and PHENIX. Based on this input, we report our recommendations for Runs 12 and 13 with discussion of heavy ion, polarized proton (Section 2) and Drell-Yan physics (Section 3). We also make recommendations regarding future development of the decadal plans (Section 4). The recommendations of

275

DOE Response to 2013 EAC Recommendations Available | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 EAC Recommendations Available 3 EAC Recommendations Available DOE Response to 2013 EAC Recommendations Available November 4, 2013 - 3:47pm Addthis Assistant Secretary for Electricity Delivery and Energy Reliability Patricia Hoffman submitted a memo to the Electricity Advisory Committee providing the Department of Energy's response to the EAC's analyses and recommendations made in 2013. The memo and included documentation address EAC recommendations on the following topics: Recommendations on Interconnection-Wide Planning, June 2013 Recommendations on the Race to the Top Initiative, June 2013 Recommendations on Consumer Acceptance of Smart Grid, June 2013 Recommendations on the CSG Interstate Transmission Siting Compact, June 2013 Addthis Related Articles DOE Response to 2012 EAC Recommendations Available

276

Recommendation 219: Recommendation Regarding the Creation of...  

Office of Environmental Management (EM)

representations of current and planned EM legacy waste disposition paths. Similar maps were created some time ago for two waste disposition workshops. The EM SSAB requests...

277

Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect

The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.

NONE

1999-07-15T23:59:59.000Z

278

ESPC Acquisition Plan Strategy and Guidance  

Energy.gov (U.S. Department of Energy (DOE))

Document features a recommended process for developing an acquisition plan within a Federal energy savings performance contract (ESPC).

279

Recommendation 211 : Recommendation on Availability of DOE Environment...  

Office of Environmental Management (EM)

211 More Documents & Publications Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets Recommendation 217: Stewardship Point of Contact for the Oak Ridge...

280

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approach to Meeting Requirements Examples Approach to Meeting Requirements Examples Example 26 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact...  

Energy Savers (EERE)

Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets Not all fact sheets that can be accessed on...

282

FACT SHEET: MULTILATERAL SOLAR AND WIND WORKING GROUP  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACT SHEET: MULTILATERAL SOLAR AND WIND WORKING GROUP At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers announced the development of a Multilateral Solar and Wind Working Group to promote accelerated deployment of solar and wind technologies by implementing recommendations from the MEF Technology Action Plan on Solar and Wind Technologies that was released by the Major Economies Forum Global Partnership in December 2009. The

283

FACT SHEET: MULTILATERAL SOLAR AND WIND WORKING GROUP  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACT SHEET: MULTILATERAL SOLAR AND WIND WORKING GROUP At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers announced the development of a Multilateral Solar and Wind Working Group to promote accelerated deployment of solar and wind technologies by implementing recommendations from the MEF Technology Action Plan on Solar and Wind Technologies that was released by the Major Economies Forum Global Partnership in December 2009. The

284

Energy Efficiency in Western Utility Resource Plans Implications for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

in Western Utility Resource Plans Implications in Western Utility Resource Plans Implications for Regional Assessments and Initiatives Energy Efficiency in Western Utility Resource Plans Implications for Regional Assessments and Initiatives Project scope: Comparative analysis of recent resource plans filed by 14 utilities in the Western U.S. and Canada. Analyze treatment of conventional & emerging resource options-including energy efficiency (EE)-Assess risk analysis & portfolio management -Develop more standardized methods and conventions for resource assessment-Summarize how issues are handled in resource plans; identify "best practices" and offer recommendations-Create information tools for CREPC that facilitate work on related projects (e.g. regional transmission planning) Energy Efficiency in Western Utility Resource Plans Implications for

285

Credit Committee Recommendation Regarding Solyndra  

Energy.gov (U.S. Department of Energy (DOE))

Full Credit Committee Recommendation regarding the Solyndra loan guarantee. This recommendation was made following the Committee's January 09, 2009 meeting.

286

Validation Process and Uncertainty Budget: A Recommended Approach for Performance Verification  

Science Journals Connector (OSTI)

......process. This paper reviews methods recommended...and a validation plan shall be created...according to the plan. Finally a validation...stated by law or the regulatory authority. UNCERTAINTY...consistent validation plan therefore specifies...process. This paper reviews methods recommended......

R. Cruz Surez; J. Zeger

2007-07-01T23:59:59.000Z

287

Working Copy  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE/WIPP-99-2286 Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan Revision 7 U.S. Department of Energy December 2013 This document supersedes DOE/WIPP-99-2286, Rev. 6. Working Copy Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan DOE/WIPP-99-2286, Rev. 7 2 TABLE OF CONTENTSCHANGE HISTORY SUMMARY .............................................. 3 ACRONYMS AND ABBREVIATIONS ............................................................................ 4 1.0 INTRODUCTION .................................................................................................. 6 2.0 NOTIFICATION OR REPORTING REQUIREMENTS AND COMMITMENTS ..... 7

288

Environmental assessment for transuranic waste work-off plan, Los Alamos National Laboratory. Rough draft: Final report  

SciTech Connect

The Los Alamos National Laboratory (LANL) generates transuranic (TRU) waste in a variety of programs related to national defense. TRU waste is a specific class of radioactive waste requiring permanent isolation. Most defense-related TRU waste will be permanently disposed of in the Waste Isolation Pilot Plant (WIPP). WIPP is a deep geologic repository located in southeastern New Mexico and is now in the testing phase of development. All waste received by Wipp must conform with established Waste Acceptance Criteria (WAC). The purpose of the proposed action is to retrieve stored TRU waste and prepare the waste for shipment to and disposal WIPP. Stored TRU waste LANL is represented by four waste forms. The facilities necessary for work-off activities are tailored to the treatment and preparation of these four waste forms. Preparation activities for newly generated TRU waste are also covered by this action.

Not Available

1990-10-26T23:59:59.000Z

289

Work Address:  

NLE Websites -- All DOE Office Websites (Extended Search)

BO SAULSBURY BO SAULSBURY Work Address: Home Address: Oak Ridge National Laboratory 12952 Buckley Road National Transportation Research Center Knoxville, TN 37934 Building NTRC-2, Room 118 (865) 288-0750 Oak Ridge, TN 37831-6479 (865) 574-4694 saulsburyjw@ornl.gov Technical Specialties: Land use planning Environmental and socioeconomic impact assessment National Environmental Policy Act (NEPA) project management Vehicle fuel economy Education: 1986 B. A., History (minors in English and Business), The University of Tennessee 1989 M. S., Planning, The University of Tennessee (Thesis title: Land Use Compatibility Planning for Airfield Environs: Intergovernmental Cooperation to Protect Land Users From the Effects of Aircraft Operations)

290

Technology Survey to Support Revision to the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit at the U.S. Department of Energys Hanford Site  

SciTech Connect

A survey of technologies was conducted to provide information for a Data Quality Objectives process being conducted to support revision of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit. The technology survey considered remediation and characterization technologies. This effort was conducted to address, in part, comments on the previous version of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit as documented in 200SW1 and 200SW2 Collaborative Workshops?Agreement, Completion Matrix, and Supporting Documentation. By providing a thorough survey of remediation and characterization options, this report is intended to enable the subsequent data quality objectives and work plan revision processes to consider the full range of potential alternatives for planning of the Remedial Investigation/Feasibility Study activities.

Truex, Michael J.; Johnson, Christian D.; Nimmons, Michael J.

2007-09-25T23:59:59.000Z

291

September 2009 Recommendation Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendation 2009-06: EM should encourage the Department to establish standard, complex-wide processes for soliciting, accepting, and evaluating EPI proposals and projects. Recommendation 2009-07: As various EPI enterprises are proposed and reviewed, EM should encourage the Department to seek independent support for business model evaluation, technical and programmatic deployment risk analyses, and determining economies of scale as they relate to former site transition and/or impacts on local community economic redevelopment. Recommendation 2009-08: EM should encourage the Secretary of Energy to issue a memorandum convening an interdepartmental taskforce and develop a policy for implementation of the EPI. Recommendation 2009-09: As EPI programs develop, EM should consider the use of royalty

292

Climate VISION: Private Sector Initiatives: Semiconductors: Work...  

Office of Scientific and Technical Information (OSTI)

Plans The Semiconductor Industry Association has finalized its work plan with the collaboration of EPA. The plan describes actions the industry intends to take to achieve its...

293

Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste fadities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCIA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RIFA)/RCRA Facility Investigation (RFI)/Coffective Measures Study (CMS)/Corrective Measures Implementation process. Under CERCLA, the actions follow the Pre@ary Assessment/Site Investigation (PA/Sl) Remedial Investigation Feasibility Study (RI/FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCIA into an RI Work Plan for the lint phase of characterization of Bear Creek Valley (BCV) Operable Unit (OU) 4.

Not Available

1992-12-01T23:59:59.000Z

294

DOE Challenge Home Recommended Quality Management Provisions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommended Quality Recommended Quality Management Provisions RECOMMENDED QUALITY MANAGEMENT PROVISIONS QM Provision Builder Documentation & Verification Requirements Rater/Verifier Requirements QM #1: Project Documentation Complete construction documents shall be qualified as Designed to Earn ENERGY STAR and document all additional provisions and specifications required for DOE Challenge Home including mandatory provisions: 2012 IECC envelope insulation levels, ENERGY STAR windows, duct work in conditioned space, hot water distribution requirements requirements for indoor fixtures, EPA Indoor airPLUS checklist, and Renewable Energy Ready Home Checklists. Develop and store construction documents which, at a minimum, shall include all content required to consistently implement

295

Energy Department Releases Strategic Plan for Energy Storage Safety  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Electricity Delivery and Energy Reliability (OE) has worked with industry and other stakeholders to develop the Energy Storage Safety Strategic Plan, a roadmap for grid energy storage safety that highlights safety validation techniques, incident preparedness, safety codes, standards, and regulations. The Plan, which is now available for downloading, also makes recommendations for near- and long-term actions. The Energy Storage Safety Strategic Plan complements two reports released by OE earlier this year: the Overview of Development and Deployment of Codes, Standards and Regulations Affecting Energy Storage System Safety in the United States and the Inventory of Safety-related Codes and Standards for Energy Storage Systems.

296

EMAB Reports and Recommendations - September 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 EMAB Reports and Recommendations - September 2009 Letter from James Ajello, Chair, to Assistant Secretary Inés Triay Report: EM Energy Park Initiative Report: Strategic Planning Impacts Report: Acquisition, Project Management, and Quality Assurance Report: Employee Recruitment and Service Recognition September 2009 Recommendation Summary Response (3/3/2010) Documents Available for Download Letter from James Ajello, Chair, to Assistant Secretary Inés Triay Report: EM Energy Park Initiative Report: Strategic Planning Impacts Report: Acquisition, Project Management, and Quality Assurance Report: Employee Recruitment and Service Recognition September 2009 Recommendation Summary Response (3/3/2010) More Documents & Publications EMAB Meeting - April 2009

297

EMAB Reports and Recommendations - September 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 EMAB Reports and Recommendations - September 2008 Letter from James Ajello, Chair, to Assistant Secretary James Rispoli Report: EM Communications Report: EM Strategic Planning Report: EM Acquisition and Project Management Report: EM Quality Assurance Report: EM Human Capital Initiatives Report: EM Management Analysis and Strategic Vision-Casting September 2008 EMAB Recommendation Summary Response (11/26/2008) Documents Available for Download Letter from James Ajello, Chair, to Assistant Secretary James Rispoli Report: EM Communications Report: EM Strategic Planning Report: EM Acquisition and Project Management Report: EM Quality Assurance Report: EM Human Capital Initiatives Report: EM Management Analysis and Strategic Vision-Casting September 2008 EMAB Recommendation Summary

298

Los Alamos Public Schools recommended for accreditation  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos Schools Recommended For Accreditation Los Alamos Schools Recommended For Accreditation Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Los Alamos Public Schools recommended for accreditation Los Alamos Public Schools has taken the unusual step of working to obtain accreditation for its entire district. January 1, 2013 dummy image Read our archives Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email We knew as a school system we had a lot going for us, but we wanted additional perspectives on areas where we needed to do more work. While virtually all high schools in the country are accredited so their students can qualify for admission to a full array of colleges, Los Alamos Public Schools has taken the unusual step of working to obtain

299

Introduction Recommendations Environment Impacts  

E-Print Network (OSTI)

). Print. Gies, Erica."Solar Panel Recycling Gears Up".Web. Larsen, Kari. "End-of-life PV:ThenWhat? - Recycling Solar PV Panels." Renewable Energy Focus. 3Aug. 2009.Web. Muller,A.;Wambach, K.;Alsema,A. Mater. Decommission and Recycle 2. Extended use past recommended decommission age Eliminate solar cell disposal

Iglesia, Enrique

300

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

COMBUSTION SYSTEMS COMBUSTION SYSTEMS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SOLID OXIDE FUEL CELLS SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

302

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SEPTEMBER 2013 SEPTEMBER 2013 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

303

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

304

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

305

Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

Not Available

1993-09-01T23:59:59.000Z

306

Energy Efficiency Policy Recommendations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Recommendations Policy Recommendations for the New Administration and Congress American Council for an Energy-Efficient Economy February, 2001 There are a variety of energy challenges confronting the United States at this time: First, electricity reliability problems and price s-uges have become a major crisis in California and are threatening to reach the crisis level in other regions of the country. Second, natural gas prices have increased by 100%/ or more in many parts of the country, causing skyrocketing home energy bills this winter. And high natural gas prices are expected to continue due to tight supplies and growing demand. Third, our reliance on imported oil -hasgrownduerto a-combination-ofdecciningdomesticoil- ply and growingdemand ed to the lack of fuel efficiency improvement in motor vehicles.

307

Management Plan Management Plan  

E-Print Network (OSTI)

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

308

Action Plan UNIVERSITY OF MISSOURI  

E-Print Network (OSTI)

Energy, Energy Economics and Policy, and Energy-related Commercialization & Business Development. Other, transportation will play a larger role in its greenhouse gas profile. The Climate Action Plan recommends sustain- ability plan. While the initial Climate Action Plan focuses primarily on greenhouse gas emissions

Taylor, Jerry

309

January 7, 2013, Department letter accepting Board Recommendation 2012-2, Hanford Tank Farms Flammable Gas Safety Strategy  

NLE Websites -- All DOE Office Websites (Extended Search)

7, 2013 7, 2013 The Honorable PeterS. Winokur Chairman Defense Nuclear Facilities Safety Board 625 Indiana A venue, NW, Suite 700 Washington, DC 20004 Dear Mr. Chairman: The Department of Energy (DOE) acknowledges receipt of Defense Nuclear Facilities Safety Board (Board) Recommendation 2012-2, Iianford Tank Fanns Flammable Gas Safety Strategy, issued on September 28, 2012, published in the Federal Register on October 12, 20 12, and accepts the Recommendation. The Board acknowledged in its Recommendation that some improvements had been made to the specific administrative controls used for flamn1able gas monitoring, but noted that more work was needed to make the ventilation systetn a credited safety control. DOE agrees. In developing an Implementation Plan (IP), DOE will take the

310

Recommendations for reducing ambiguity in written procedures.  

SciTech Connect

Previous studies in the nuclear weapons complex have shown that ambiguous work instructions (WIs) and operating procedures (OPs) can lead to human error, which is a major cause for concern. This report outlines some of the sources of ambiguity in written English and describes three recommendations for reducing ambiguity in WIs and OPs. The recommendations are based on commonly used research techniques in the fields of linguistics and cognitive psychology. The first recommendation is to gather empirical data that can be used to improve the recommended word lists that are provided to technical writers. The second recommendation is to have a review in which new WIs and OPs and checked for ambiguities and clarity. The third recommendation is to use self-paced reading time studies to identify any remaining ambiguities before the new WIs and OPs are put into use. If these three steps are followed for new WIs and OPs, the likelihood of human errors related to ambiguity could be greatly reduced.

Matzen, Laura E.

2009-11-01T23:59:59.000Z

311

Standard Format and Content for Emergency Plans  

Directives, Delegations, and Requirements

This volume addresses recommended emergency plan format and content for Operational Emergency Base Programs and Operational Emergency Hazardous Material Programs. Canceled by DOE G 151.1-3.

1997-08-21T23:59:59.000Z

312

Work with Biological Materials  

NLE Websites -- All DOE Office Websites (Extended Search)

Work with Biological Materials Print Planning A complete Experiment Safety Sheet (ESS) is required before work can be done at the ALS. This ESS is either a part of the proposal...

313

Recommendation Report Workgroup ...  

NLE Websites -- All DOE Office Websites (Extended Search)

energy savings acquired through the work of Community Action Agencies, customer utilities may not be receiving credit for those savings occurring in their service...

314

Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plan science-innovationassetsimagesicon-science.jpg Strategic Plan x Strategic Plan Los Alamos National Laboratory Strategic Plan - 2014 (pdf) Our Strategic Plan...

315

Making recommendations from multiple domains  

Science Journals Connector (OSTI)

Given the vast amount of information on the World Wide Web, recommender systems are increasingly being used to help filter irrelevant data and suggest information that would interest users. Traditional systems make recommendations based on a single domain ... Keywords: collaborative filtering, personalization, recommendation, social trust

Wei Chen; Wynne Hsu; Mong Li Lee

2013-08-01T23:59:59.000Z

316

Fact Sheet: Multilateral Solar and Wind Working Group | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Multilateral Solar and Wind Working Group Multilateral Solar and Wind Working Group Fact Sheet: Multilateral Solar and Wind Working Group A fact sheet detailling the development of a Multilateral Solar and Wind Working Group to promote accelerated deployment of solar and wind technologies by implementing recommendations from the MEF Technology Action Plan on Solar and Wind Technologies that was released by the Major Economies Forum Global Partnership in December 2009. The Multilateral Solar and Wind Working Group will focus its initial work on developing a Global Atlas for Solar and Wind Energy and a corresponding Long-Term Strategy on Joint Capacity Building. Fact Sheet: Multilateral Solar and Wind Working Group More Documents & Publications Renewables-Fact-Sheet.pdf Clean Energy Ministerial Press Fact Sheer

317

Waste Management Quality Assurance Plan  

E-Print Network (OSTI)

PUB-5352, Rev. 6 WM QA Plan Review and approval of changesand review of procedures, work plans, instructions, reports,Plans, Instructions and Reports9 4.1.2 Procedure Review and

Waste Management Group

2006-01-01T23:59:59.000Z

318

QEP WORKING GROUP CHARGES Assessment Working Group  

E-Print Network (OSTI)

. (Standard 2.12) During Phase I of the planning process, members of the Assessment Working Group with the institution's strategic plan, a review of the literature, definition of student learning appropriate related to goals. (Handbook for Review Committees, Standards 2.12 and 3.3.2) During Phase I

Liu, Paul

319

Robust Optimization of Recommendation Sets with the Maximin Utility Criterion  

E-Print Network (OSTI)

possible user preferences, and make recommendations based on expected utility. Another line of work [1Robust Optimization of Recommendation Sets with the Maximin Utility Criterion Paolo Viappiani1 Mellon University, USA ckroer@cs.cmu.edu Abstract. We investigate robust decision-making under utility

Sandholm, Tuomas W.

320

CUSTOMER COMMENTS ON COUNCIL'S DRAFT RECOMMENDATIONS REGARDING BPA'S FUTURE ROLE  

E-Print Network (OSTI)

1 CUSTOMER COMMENTS ON COUNCIL'S DRAFT RECOMMENDATIONS REGARDING BPA'S FUTURE ROLE INTRODUCTION These comments are submitted on behalf of BPA's customers in response to the draft recommendations released into the topic of BPA's future role, and look forward to continuing to work with the Council to successfully

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

SUMMARY PLAN DESCRIPTION Plan Name: MCWAH Vision Plan [Plan # 505  

E-Print Network (OSTI)

to pay for such coverage. Review this summary plan description and the documents governing the planSUMMARY PLAN DESCRIPTION Plan Name: MCWAH Vision Plan [Plan # 505] Plan Type: Group Vision Insurance Plan Year: July 1 ­ June 30 Employer\\Policyholder\\Plan Administrator\\Plan Sponsor: Medical College

322

Microsoft Word - Overall recommendations final.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

11-12, 2013 11-12, 2013 1. Introduction On June 11, 2013, the PAC heard background information on accelerator performance and plans, separate presentations on the status of beam energy scan, d+Au, U+U and Cu+Au analyses, updates on plans for STAR and PHENIX detector upgrades, the PHENIX and STAR Beam Use Requests (BURs) for Runs 14 and 15 and a letter of intent regarding possible very forward angle measurements to help improve cosmic ray shower modeling. Based on this input, we begin with our assessment of the progress on the d+Au, Cu+Au and U+U analyses (Section 2), report our recommendations for Runs 14 and 15 (Section 3, including embedded comments on the beam energy scan), assess the LHCf@RHIC letter of intent (Section 4) and conclude with a brief discussion of the

323

UNIVERSITY OF MARYLAND, BALTIMORE / FACILITIES MASTER PLAN UPDATE APPENDIX SECTION 1 / Utilities Master Plan  

E-Print Network (OSTI)

/ Utilities Master Plan #12;#12;UTILITIES MASTER PLAN JULY 2010 FINAL REPORT University of Maryland, Baltimore................................................................... 1-5 1.7 ENERGY UTILITIES RECOMMENDATION ............................................................ 1-7 1.8 MUNICIPAL AND OTHER UTILITIES

Weber, David J.

324

CLIMATE ACTION PLAN SEPTEMBER 2009  

E-Print Network (OSTI)

· ALBUQUERQUE, NEW MEXICO #12;#12;The University of New Mexico is committed to reducing energy usage and ourCLIMATE ACTION PLAN SEPTEMBER 2009 UNIVERSITY OF NEW MEXICO · OFFICE OF SUSTAINABILITY ................................ 18 C. Electricity Recommendation #1 Solar........... 21 D. Electricity Recommendation #2 Smart Grid

Maccabe, Barney

325

April 2009 EMAB Recommendation Summary  

Office of Environmental Management (EM)

the Energy Park Initiative. Recommendation 2009-04: Ultimately, EM should consider a royalty based valuation of footprint reduction efforts and the turn over of local resources....

326

Bicycle Master Plan Acknowledgments  

E-Print Network (OSTI)

Bicycle Master Plan #12;Acknowledgments Many people contributed to the development of the APU Bicycle Master Plan by providing valuable input, comments and review of the document. Different departments of APU will have to work together to implement the plan and to further encourage bicycling

Scheel, David

327

EMAB Reports and Recommendations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EMAB » EMAB Reports and EMAB » EMAB Reports and Recommendations EMAB Reports and Recommendations December 5, 2011 EMAB Reports and Recommendations - December 2011 Environmental Management Advisory board letters, reports, and recommendations. June 29, 2011 EMAB Reports and Recommendations - June 29, 2011 Environmental Management Advisory board letters, reports, and recommendations. June 23, 2011 EMAB Reports and Recommendations - June 23, 2011 Environmental Management Advisory board letters, reports, and recommendations. September 30, 2009 EMAB Reports and Recommendations - September 2009 Environmental Management Advisory board letters, reports, and recommendations. September 15, 2009 EMAB Reports and Recommendations - September 2010 Environmental Management Advisory board letters, reports, and

328

Mobile Recommender Systems Francesco Ricci  

E-Print Network (OSTI)

Mobile Recommender Systems Francesco Ricci Faculty of Computer Science Free University of Bolzano, Italy fricci@unibz.it January 11, 2010 Abstract Mobile phones are becoming a primary platform for information access and when coupled with recommender systems technologies they can become key tools for mobile

Ricci, Francesco

329

Climate VISION: Private Sector Initiatives: Oil and Gas: Work...  

Office of Scientific and Technical Information (OSTI)

Work Plans API has developed a work plan based on API's commitment letter and the Climate Challenge Program which addresses the overall elements of the Climate VISION program...

330

Schedule optimization study implementation plan  

SciTech Connect

This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

Not Available

1993-11-01T23:59:59.000Z

331

Thailand-Key Results and Policy Recommendations for Future Bioenergy  

Open Energy Info (EERE)

and Policy Recommendations for Future Bioenergy and Policy Recommendations for Future Bioenergy Development Jump to: navigation, search Name Thailand-Key Results and Policy Recommendations for Future Bioenergy Development Agency/Company /Organization Food and Agriculture Organization of the United Nations Sector Land Focus Area Biomass, Agriculture Topics Co-benefits assessment, Policies/deployment programs, Background analysis Resource Type Lessons learned/best practices Website http://www.fao.org/docrep/013/ Country Thailand UN Region South-Eastern Asia References Thailand-Key Results and Policy Recommendations for Future Bioenergy Development[1] Abstract "The Government of Thailand, through its Alternative Energy Development Plan, has set a target to increase biofuel production to five billion

332

Environmental monitoring plan  

SciTech Connect

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

Holland, R.C.

1997-02-01T23:59:59.000Z

333

Business System Planning Project, Preliminary System Design  

SciTech Connect

CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time.

EVOSEVICH, S.

2000-10-30T23:59:59.000Z

334

RECOMMENDED GUIDELINES FOR WASTEWATER CHARACTERIZATION  

E-Print Network (OSTI)

#12;RECOMMENDED GUIDELINES FOR WASTEWATER CHARACTERIZATION IN THE FRASER RIVER BASIN VOLUME II Ont. June 1993 Amended April 1994 #12;GUIDELINES FOR WASTEWATER CHARACTERIZATION PREFACE Ltd., Calgary, Alberta. #12;GUIDELINES FOR WASTEWATER CHARACTERIZATION EXECUTIVE SUMMARY The Fraser

335

May 2008 EMAB Recommendation Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8-01: Introduce granularity into the small business selection 8-01: Introduce granularity into the small business selection process to ensure that EM's small business acquisitions comprise the appropriate core competencies, size, and bench strength for its projects. Recommendation 2008-02: Establish a culture of project ownership and accountability in order to achieve a more efficient procurement process. Recommendation 2008-03: Identify and optimize those resources and corporate messages that prove most effective in recruiting and securing new talent. Recommendation 2008-04: Create an inclusive environment where all employees continue to feel valued and involved throughout their tenure. Recommendation 2008-05: Review the Federal Human Capital Survey and aggressively address findings that indicate employee dissatisfaction.

336

STAFFREPORT Prepared for the Bioenergy Interagency Working Group  

E-Print Network (OSTI)

STAFFREPORT Prepared for the Bioenergy Interagency Working Group: Air Resources Board 2010 2009 PROGRESS TO PLAN BIOENERGY ACTION PLAN FOR CALIFORNIA CALIFORNIA ENERGY COMMISSION #12, and et. al. 2010. 2009 Progress to Plan Bioenergy Action Plan for California. California Energy

337

EAC Recommendations for DOE Action Regarding U.S. Electric Grid...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Electric Grid Resiliency More Documents & Publications Recommendations on U. S. Grid Security - EAC 2011 DOE Responses to EAC Work Products - June 2014 Electricity...

338

Status Update on Action 2b: Revision of DOE G 226.1-2 with new Guidance for Activity-level Work Planning and Control  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Strengthen guidance and formality associated with contractor implementation and Federal monitoring of activity-level WP&C. Develop a DOE Guide on Federal oversight and evaluation of the effectiveness of Activity-Level WP&C.

339

GAO report recommends review of goals, objectives  

SciTech Connect

This article highlights a recent GAO study titled Nuclear Waste: Yucca Mountain Project Behind Schedule and Facing Major Scientific Uncertainties. The study was undertaken at the request of the former chairman of the Subcommittee on Nuclear Regulation, the predecessor of the current Subcommittee on Clean Air and Nuclear Regulation of the Senate Committee on Environment and Public Works. The report concludes that the level of funding DOE is requesting is not adequate to complete the goals of the project within the established timeline, and questions whether the changes being recommended by DOE to streamline the project will save money at the cost of safety. The GAO report recommends that the Secretary of Energy {open_quotes}...review the program`s goals and objectives in the context of the program`s priority for funding.{close_quotes} It also recommends that Congress not consider any funding changes until the Secretary`s report is in and an independent review by the Nuclear Waste Technical Review Board is also available.

NONE

1993-07-01T23:59:59.000Z

340

The National Environmental Justice Advisory Committee (NEJAC) Model Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The National Environmental Justice Advisory Committee (NEJAC) Model The National Environmental Justice Advisory Committee (NEJAC) Model Plan for Public Participation The National Environmental Justice Advisory Committee (NEJAC) Model Plan for Public Participation This report and recommendations have been written as a part of the activities of the NEJAC, a public advisory committee providing extramural policy information and advice to the Administrator and other officials of the U.S. Environmental Protection Agency (EPA). The Council is structured to provide balanced, expert assessment of matters related to environmental justice. This report has been reviewed by EPA. The National Environmental Justice Advisory Committee (NEJAC) Model Plan for Public Participation More Documents & Publications National Environmental Justice Advisory Council Federal Facilities Working

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Preliminary low-level waste feed staging plan  

SciTech Connect

A Preliminary Low-Level Waste Feed Staging Plan was prepared. The plan supports the Phase I privatization effort by providing recommendations that may influence the technical content of the final request for proposal, and the interface control documents for the turnover of two double-shell tanks (DST) to the private contractors for use as feed tanks and the transfer of supernate to these tanks. Additionally, the preliminary schedule of feed staging activities will be useful to both RL and the private bidders during the contract negotiation period. A revised feed staging plan will be issued in August 1996 reflecting anticipated changes in the request for proposal, resolution of issues identified in this report, and completion of additional work scope.

Certa, P.J.

1996-02-05T23:59:59.000Z

342

Work Authorization System  

Directives, Delegations, and Requirements

To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. Cancels DOE O 412.1.

2005-04-21T23:59:59.000Z

343

Work Authorization System  

Directives, Delegations, and Requirements

To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A.

2005-04-21T23:59:59.000Z

344

PLANNING UNIT October 26, 2009  

E-Print Network (OSTI)

PLANNING UNIT October 26, 2009 Advertisement for TRIPP Chair in the Institute A large number research work in the area of Transportation Planning for control of accidents and pollution with special

Prasad, Sanjiva

345

Recommendations  

NLE Websites -- All DOE Office Websites (Extended Search)

Brookhaven National Laboratory Nuclear and Particle Physics Program Advisory Committee 12-14 September 2006 1. Responses to Presentations On September 12, 2006, the PAC heard proposals for the RHIC complex and descriptions of letters-of-intent for two electric dipole moment experiments. LoI: Search for an Electron EDM with PbF This letter proposes a search for an electron electric dipole in the paramagnetic molecule PbF. Electric dipole moment studies are of keen physics interest, and are being pursued by a number of groups around the world. This experiment involves measurement of the energy splitting of magnetic sub-states caused by the interaction of an electron electric dipole moment with the intense internal electric field of the molecule. The goal of 10

346

Enhancing recommender systems by incorporating social information  

Science Journals Connector (OSTI)

Although recommendation techniques have achieved distinct developments over the decades, the data sparseness problem of the involved user-item matrix still seriously influences the recommendation quality. Most...

Li-wei Huang; Gui-sheng Chen; Yu-chao Liu

2013-09-01T23:59:59.000Z

347

SEAB Endorsement of Office of Science Working Group | Department...  

Energy Savers (EERE)

SEAB Endorsement of Office of Science Working Group SEAB Endorsement of Office of Science Working Group This memorandum from SEAB presents the recommendation from the Task Force on...

348

Environmental Monitoring Plan  

SciTech Connect

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

1993-07-01T23:59:59.000Z

349

Cloud Computing Synopsis and Recommendations  

Science Journals Connector (OSTI)

This document reprises the NIST-established definition of cloud computing, describes cloud computing benefits and open issues, presents an overview of major classes of cloud technology, and provides guidelines and recommendations on how organizations ... Keywords: cloud computing, computer security, virtualization

Mark Lee Badger; Timothy Grance; Robert Patt-Corner; Jeffery M, Voas

2012-05-01T23:59:59.000Z

350

IDC Integrated Master Plan.  

SciTech Connect

This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

Clifford, David J.; Harris, James M.

2014-12-01T23:59:59.000Z

351

TransBorder 2035 Metropolitan Transportation Plan  

E-Print Network (OSTI)

land use and transportation solutions that offer the best opportunities to reduce vehicle miles trav- eled, promote alternative modes, and protect the natural environment. Recommend that planning efforts regarding transportation facilities...

El Paso Metropolitan Planning Organization

2007-11-16T23:59:59.000Z

352

Recommendations for the Supplement Analysis Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendations Recommendations for the Supplement Analysis Process July 2005 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Compliance Recommendations for the Supplement Analysis Process July 2005 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Compliance printed on recycled paper Recommendations for the Supplement Analysis Process Contents

353

Language models for financial news recommendation  

Science Journals Connector (OSTI)

Keywords: application, evaluation, language models, piecewise linear regression, recommender system, text mining, time series

Victor Lavrenko; Matt Schmill; Dawn Lawrie; Paul Ogilvie; David Jensen; James Allan

2000-11-01T23:59:59.000Z

354

TEC Working Group Topic Groups Manual Review | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manual Review Manual Review TEC Working Group Topic Groups Manual Review This group is responsible for the update of DOE Manual 460.2-1, Radioactive Material Transportation Practices Manual. This manual was issued on September 23, 2002, and establishes a set of standard transportation practices for U.S. Department of Energy (DOE) programs to use in planning and executing offsite shipments of radioactive materials including radioactive waste. The manual was developed in response to recommendations from various DOE programs and external stakeholders. A writing group was convened to evaluate the shipping practices being used or planned for use throughout the Department, document them, and, where appropriate, standardize them. The results of this effort are reflected

355

National Grid Energy Efficiency Plans  

Energy.gov (U.S. Department of Energy (DOE))

Presentation covers the National Grid Energy Efficiency plans and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

356

Interagency Working Groups (IWGs)  

NLE Websites -- All DOE Office Websites (Extended Search)

Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) are the primary USGCRP vehicles for implementing and coordinating research activities within and across agencies. These groups are critical to Program integration and in assessing the Program's progress. The working groups span a wide range of interconnected issues of climate and global change, and address major components of the Earth's environmental and human systems, as well as cross-disciplinary approaches for addressing these issues. IWGs correspond to program functions and are designed to bring agencies together to plan and develop coordinated activities, implement joint activities, and identify and fill gaps in the Program's plans. They allow public officials to communicate with each other on emerging directions within their agencies, on their stakeholder needs, and on best practices learned from agency activities. Together, these functions allow the agencies to work in a more coordinated and effective manner.

357

Alternative Fuels Data Center: State Energy Plan  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

State Energy Plan to State Energy Plan to someone by E-mail Share Alternative Fuels Data Center: State Energy Plan on Facebook Tweet about Alternative Fuels Data Center: State Energy Plan on Twitter Bookmark Alternative Fuels Data Center: State Energy Plan on Google Bookmark Alternative Fuels Data Center: State Energy Plan on Delicious Rank Alternative Fuels Data Center: State Energy Plan on Digg Find More places to share Alternative Fuels Data Center: State Energy Plan on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type State Energy Plan The Virginia Energy Plan assesses the commonwealth's primary energy sources and recommends actions to meet the following goals: make Virginia the energy capital of the East Coast by expanding traditional and alternative

358

CREDAWorkingGroupRecommendation100303summaryfinal.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

CREDA RECOMMENDATION CREDA RECOMMENDATION Western Area Power Administration Customer Meeting October 6, 2003 The Board of Directors of the Colorado River Energy Distributors Association (CREDA) makes the following recommendations to the Western Area Power Administration: A. As a long-term equitable strategy and solution, Western should consider adopting a phased in SHP level, beginning with the current Water Year 2004 SHP level and ramping up in five equal annual increments to current calculated Median generation level (4948.78 GWH for SHP or 5200.12 GWH for Total Load) in 2009. Through the processes established under the 1992 Work Program (Agreement No. 92-SLC-0208), CREDA will continue to work with Western to review hydrologic, financial, operational and cash flow information at least

359

Radiological Conditions in the Dnieper River Basin: Assessment by an international expert team and recommendations for an action plan. ? STI/PUB/1230, International Atomic Energy Agency, Wagramer Strasse 5, P.O. Box 100, A-1400, Vienna, Austria. ISBN 92-0-104905-6, 200 pp, 2006, 38.00 Euro (softbound).  

Science Journals Connector (OSTI)

......tributaries, uranium mining and ore...strategic action plan and individual government national plans. The discussion...the applicable standards, and do not present...region. The report reviews the environmental impacts of uranium mining and ore......

Bruce A. Napier

2007-03-01T23:59:59.000Z

360

Radiological Conditions in the Dnieper River Basin: Assessment by an international expert team and recommendations for an action plan. ? STI/PUB/1230, International Atomic Energy Agency, Wagramer Strasse 5, P.O. Box 100, A-1400, Vienna, Austria. ISBN 92-0-104905-6, 200 pp, 2006, 38.00 Euro (softbound).  

Science Journals Connector (OSTI)

......tributaries, uranium mining and ore processing...strategic action plan and individual government national plans. The discussion...below the applicable standards, and do not present...region. The report reviews the environmental impacts of uranium mining and ore processing......

Bruce A. Napier

2007-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

3 2009 OSGOC -Research Work team Report Research Work Team Recommendations  

E-Print Network (OSTI)

Education efforts) to use the University campus, buildings and facilities as a case study for energy Sustainability Goals and Outcomes Committee Executive Summary The University of Minnesota must play a leadership role in addressing the complex sustainability problems of the 21st century by conducting highly

Minnesota, University of

362

Reactive power interconnection requirements for PV and wind plants : recommendations to NERC.  

SciTech Connect

Voltage on the North American bulk system is normally regulated by synchronous generators, which typically are provided with voltage schedules by transmission system operators. In the past, variable generation plants were considered very small relative to conventional generating units, and were characteristically either induction generator (wind) or line-commutated inverters (photovoltaic) that have no inherent voltage regulation capability. However, the growing level of penetration of non-traditional renewable generation - especially wind and solar - has led to the need for renewable generation to contribute more significantly to power system voltage control and reactive power capacity. Modern wind-turbine generators, and increasingly PV inverters as well, have considerable dynamic reactive power capability, which can be further enhanced with other reactive support equipment at the plant level to meet interconnection requirements. This report contains a set of recommendations to the North-America Electricity Reliability Corporation (NERC) as part of Task 1-3 (interconnection requirements) of the Integration of Variable Generation Task Force (IVGTF) work plan. The report discusses reactive capability of different generator technologies, reviews existing reactive power standards, and provides specific recommendations to improve existing interconnection standards.

McDowell, Jason (General Electric, Schenectady, NY); Walling, Reigh (General Electric, Schenectady, NY); Peter, William (SunPower, Richmond, CA); Von Engeln, Edi (NV Energy, Reno, NV); Seymour, Eric (AEI, Fort Collins, CO); Nelson, Robert (Siemens Wind Turbines, Orlando, FL); Casey, Leo (Satcon, Boston, MA); Ellis, Abraham; Barker, Chris. (SunPower, Richmond, CA)

2012-02-01T23:59:59.000Z

363

Using Structure-Based Recommendations to Facilitate Discoverability in APIs  

E-Print Network (OSTI)

Using Structure-Based Recommendations to Facilitate Discoverability in APIs Ekwa Duala the API elements necessary to implement a task are not accessible from the types they are working with. We propose an approach that leverages the structural relationships between API elements to make API methods

Robillard, Martin

364

ACQUISITION PLANNING  

Office of Environmental Management (EM)

PLANNING Guiding Principles Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory,...

365

STRATEGIC PLAN  

Energy Savers (EERE)

STRATEGIC PLAN 2015 - 2018 Message from the Associate Under Secretary for Environment, Health, Safety and Security I am proud to introduce this strategic plan for the Office of...

366

Bipartite network projection and personal recommendation  

Science Journals Connector (OSTI)

One-mode projecting is extensively used to compress bipartite networks. Since one-mode projection is always less informative than the bipartite representation, a proper weighting method is required to better retain the original information. In this article, inspired by the network-based resource-allocation dynamics, we raise a weighting method which can be directly applied in extracting the hidden information of networks, with remarkably better performance than the widely used global ranking method as well as collaborative filtering. This work not only provides a creditable method for compressing bipartite networks, but also highlights a possible way for the better solution of a long-standing challenge in modern information science: How to do a personal recommendation.

Tao Zhou; Jie Ren; Mat Medo; Yi-Cheng Zhang

2007-10-25T23:59:59.000Z

367

Recommendations for improvements to program and project management  

SciTech Connect

Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

Not Available

1994-01-01T23:59:59.000Z

368

Progress in Addressing DNFSB Recommendation 2002-1 Issues: Improving Accident Analysis Software Applications  

SciTech Connect

Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2002-1 (''Quality Assurance for Safety-Related Software'') identified a number of quality assurance issues on the use of software in Department of Energy (DOE) facilities for analyzing hazards, and designing and operating controls to prevent or mitigate potential accidents. Over the last year, DOE has begun several processes and programs as part of the Implementation Plan commitments, and in particular, has made significant progress in addressing several sets of issues particularly important in the application of software for performing hazard and accident analysis. The work discussed here demonstrates that through these actions, Software Quality Assurance (SQA) guidance and software tools are available that can be used to improve resulting safety analysis. Specifically, five of the primary actions corresponding to the commitments made in the Implementation Plan to Recommendation 2002-1 are identified and discussed in this paper. Included are the web-based DOE SQA Knowledge Portal and the Central Registry, guidance and gap analysis reports, electronic bulletin board and discussion forum, and a DOE safety software guide. These SQA products can benefit DOE safety contractors in the development of hazard and accident analysis by precluding inappropriate software applications and utilizing best practices when incorporating software results to safety basis documentation. The improvement actions discussed here mark a beginning to establishing stronger, standard-compliant programs, practices, and processes in SQA among safety software users, managers, and reviewers throughout the DOE Complex. Additional effort is needed, however, particularly in: (1) processes to add new software applications to the DOE Safety Software Toolbox; (2) improving the effectiveness of software issue communication; and (3) promoting a safety software quality assurance culture.

VINCENT, ANDREW

2005-04-25T23:59:59.000Z

369

HSEP Committee 3-Month Work Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

and opportunities o Review of contractor programs o What are the implications on safety culture (a measure of safety culture) Topic o o Quality AssuranceQuality Control...

370

Genome in a Bottle Consortium Work Plan  

E-Print Network (OSTI)

lines for whole genome RMs and design synthetic DNA constructs that could will be a set of well-characterized whole genome and synthetic DNA RMs along

371

Groundwater Monitoring Well Installation Work Plan  

E-Print Network (OSTI)

.................................................................................................... 9 4.4 Environmental Management System...................................................................................................................... 1 1.2.1 Water Quality...................................................................................................... 7 3.6 Source of Water

372

Draft Work Plan Environmental Assessment and Characterization  

E-Print Network (OSTI)

.....................................................................................................................16 4.4.2 Site Security

373

Proposed "One EERE" Work Plan Structure  

Energy Savers (EERE)

demonstration resources created through the Better Buildings Alliance http:www4.eere.energy.govallianceactivitiesdemonstrations, Green Proving Ground, http:www.gsa.gov...

374

FTCP Corrective Action Plan- Revision 1  

Energy.gov (U.S. Department of Energy (DOE))

January 2007 FTCP Corrective Action Plan, Revision 1, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004- 1, Oversight of Complex, High-Hazard Nuclear Operations

375

FTCP Corrective Action Plan- Revision 2  

Energy.gov (U.S. Department of Energy (DOE))

March 2009 FTCP Corrective Action Plan, Revision 2, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations

376

Energy Storage Safety Strategic Plan- December 2014  

Energy.gov (U.S. Department of Energy (DOE))

The Energy Storage Safety Strategic Plan is a roadmap for grid energy storage safety that addresses the range of grid-scale, utility, community, and residential energy storage technologies being deployed across the Nation. The Plan highlights safety validation techniques, incident preparedness, safety codes, standards, and regulations, and makes recommendations for near- and long-term actions.

377

OutreachCommunicationPlanGeorgiaTech Year 3 Work Plan  

E-Print Network (OSTI)

/A Email if interested Recruited 3 new MBA Directors Clean Cities Partnership / October 15, 2010 Successful - EcoCAR competition overview - Build awareness of AFV and Alternative Technology Vehicles N/A Mailing and Alternative Technology Vehicles N/A Survey general public on overall views of AFV and Alternative Technology

Houston, Paul L.

378

Recommendation 198: Establish a site transition process  

Energy.gov (U.S. Department of Energy (DOE))

The ORSSAB recommends DOE Establish a Site Transition Process Upon Completion of Remediation at Ongoing Mission Sites.

379

EM SSAB Recommendations & Letters | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendations & Letters Recommendations & Letters EM SSAB Recommendations & Letters February 27, 2013 EM SSAB Recommendations and Letters - 2013-03 Included recommendations, letters, and other related materials. February 27, 2013 EM SSAB Recommendations and Letters - 2013-02 Included recommendations, letters, and other related materials. February 27, 2013 EM SSAB Recommendations and Letters - 2013-01 Included recommendations, letters, and other related materials. July 26, 2012 EM SSAB Recommendations and Letters - 2012-01 Included recommendations, letters, and other related materials. September 19, 2011 EM SSAB Recommendations and Letters - 2011-03 Included recommendations, letters, and other related materials. September 19, 2011 EM SSAB Recommendations and Letters - 2011-02

380

Eastern Interconnection Planning Collaborative News Release | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes 2012 National Electric Transmission Congestion Study - Philadelphia Workshop EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

EMSL Strategic Plan 2008  

SciTech Connect

This Strategic Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

Campbell, Allison A.

2008-08-15T23:59:59.000Z

382

Strategic Plans | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plans Strategic Plans Strategic Plans September 20, 2013 DOE OIG Strategic Plan Fiscal Years 2014 - 2019 The Office of Inspector General's plan to strengthen the integrity, economy, and efficiency of the Department's programs and operations. December 31, 2007 DOE OIG Strategic Plan Fiscal Years 2009 - 2013 This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and performance of the Department's programs and operations. December 31, 2002 DOE OIG Strategic Plan Fiscal Years 2003-2008 This plan represents the Office of the Inspector General's vision and strong commitment for improving the management and performance of the Department of Energy's many programs and operations

383

Staff summary of Issues & Recommendations Resident Fish  

E-Print Network (OSTI)

1 Staff summary of Issues & Recommendations Resident Fish *preliminary draft, please refer to full recommendations for complete review 10/29/2013 10:07 AM 2009 Fish and Wildlife Program Section Section D. 7 Title: Resident Fish Mitigation (pg 22-23) Overview Generally, entities recommend that the existing language

384

Responses to Individual Points to Recommendation 168: Recommendation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

been shut down; since then DOE EM has gotten a funding plus-up that allowed work to resume. The mercury-related projects are extremely important and will be funded no matter...

385

DYNAMICALLY RECOMMENDING DESIGN SARAH RICHARDSON  

E-Print Network (OSTI)

Conclusions and Future Work 18 i #12;List of Figures 1 An example Abstract Syntax Tree (AST) graph at Stetson University DeLand, Florida Fall Term 2010 #12;Contents 0.1 Abstract Work 6 3.1 Design Pattern Detection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 3

Miles, Will

386

Alaska Strategic Energy Plan and Planning Handbook  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence Ave. SW, Washington DC 20585 | 202-586-1272 energy.gov/indianenergy | indianenergy@hq.doe.gov Alaska Strategic Energy Plan and Planning Handbook ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

387

Recommendations for NEAMS Engagement with the NRC: Preliminary Report  

SciTech Connect

The vision of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program is to bring a new generation of analytic tools to the nuclear engineering community in order to facilitate students, faculty, industry and laboratory researchers in investigating advanced reactor and fuel cycle designs. Although primarily targeting at advance nuclear technologies, it is anticipated that these new capabilities will also become interesting and useful to the nuclear regulator Consequently, the NEAMS program needs to engage with the Nuclear Regulatory Commission as the software is being developed to ensure that they are familiar with and ready to respond to this novel approach when the need arises. Through discussions between key NEAMS and NRC staff members, we tentatively recommend annual briefings to the Division of Systems Analysis in the NRC's Office of Nuclear Regulatory Research. However the NEAC subcommittee review of the NEAMS program may yield recommendations that would need to be considered before finalizing this plan.

Bernholdt, David E [ORNL

2012-06-01T23:59:59.000Z

388

UNIVERSITY OF CONNECTICUT SCHOOL OF SOCIAL WORK  

E-Print Network (OSTI)

UNIVERSITY OF CONNECTICUT SCHOOL OF SOCIAL WORK ACADEMIC PLAN 2009 - 2014 #12;A MESSAGE FROM DEAN with Our World, Our People, Our Future: The University of Connecticut Academic Plan 2009 ­ 2014. The University of Connecticut School of Social Work is among the top-ranked schools of social work in the nation

Holsinger, Kent

389

Recommendations on Alternative Actions for Analysis in Site-wide NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendations on Alternative Actions for Analysis in Site-wide Recommendations on Alternative Actions for Analysis in Site-wide NEPA Reviews Recommendations on Alternative Actions for Analysis in Site-wide NEPA Reviews The purpose o f this memorandum is t o recommend the treatment of the proposed action and the no action alternatives in site-wide National Environmental Pol icy Act (NEPA) reviews that are prepared for continuing and reasonably foreseeable future actions at Department o f Energy (DOE) sites. DOE prepares site-wide NEPA reviews in accordance with section 1021.331 o f the DOE NEPA Regulations (10 CFR Part 1021, published on April 24, 1992 at 57 F R 15122) to improve and coordinate agency plans, functions, programs, and resource utilization, among other reasons. Recommendations on Alternative Actions for Analysis in Site-wide NEPA

390

Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge Environmental Management Budget Request  

Energy.gov (U.S. Department of Energy (DOE))

ORSSAB provides recommendations on the DOE Oak Ridge Environmental Management budget request for FY 2016.

391

Strategy Guideline: Advanced Construction Documentation Recommendations for High Performance Homes  

SciTech Connect

As whole house energy efficiency increases, new houses become less like conventional houses that were built in the past. New materials and new systems require greater coordination and communication between industry stakeholders. The Guideline for Construction Documents for High Performance Housing provides advice to address this need. The reader will be presented with four changes that are recommended to achieve improvements in energy efficiency, durability and health in Building America houses: create coordination drawings, improve specifications, improve detail drawings, and review drawings and prepare a Quality Control Plan.

Lukachko, A.; Gates, C.; Straube, J.

2011-12-01T23:59:59.000Z

392

EMSL Contribution Plan  

SciTech Connect

This Contribution Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSLs workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSLs long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2 describes EMSLs detailed business plan, including an analysis of opportunity, organizational investments, and actionable milestones.

Campbell, Allison A.

2008-12-01T23:59:59.000Z

393

National Action Plan on Demand Response | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Action Plan on Demand Response National Action Plan on Demand Response Presentation-given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008...

394

TEXAS A&M UNIVERSITY QUALITY ENHANCEMENT PLAN  

E-Print Network (OSTI)

and Texas A&M University at Galveston, has recommended a Quality Enhancement Plan (QEP) to be used as part1 TEXAS A&M UNIVERSITY QUALITY ENHANCEMENT PLAN 2002 Prepared by the Quality Enhancement Committee Internationalization 21 Technology 22 Section 3: The Texas A&M University Quality Enhancement Plan

395

UNIT SPECIFIC PLAN FORM INVESTIGATOR INFORMATION  

E-Print Network (OSTI)

performed in your work area. This information is requested to help EHS review your Unit Specific Plan Form or stored in your work areas, a" Standard Operating Procedure" (SOP), Appendix A of the Unit Specific Plan1 UNIT SPECIFIC PLAN FORM INVESTIGATOR INFORMATION Principal Investigator: E-Mail: Department

Maroncelli, Mark

396

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Prioritization of Facility Hazards Examples Prioritization of Facility Hazards Examples Example 20 7.7 PRELIMINARY HAZARD ANALYSIS Table 7-1 Preliminary Hazard Analysis (PHA) Overview for 779 Cluster's Decommissioning and Dismantlement Major Work Task Hazard Cause Preventive Measures Perform building walkdowns to identify Integrated Work Control Package (IWCP) work steps. Tripping, falling, exposure to chemicals, hazardous substances and / or radioactive materials. Also exposure to noise hazards. No planning, lack of communicating between work groups, improper use of Radiological Work Permits (RWPs), not following room or building instructions.  Develop Activity Hazard Analysis (AHA).  Conduct effective pre-evolution briefings.

397

Climate VISION: Private Sector Initiatives: Electric Power: Work...  

Office of Scientific and Technical Information (OSTI)

Work Plans The power sector, through EPICI, submitted its work plan in the form of a Memorandum of Understanding (MOU) with DOE. The MOU, most recently updated in September 2006,...

398

2011 Colorado Preparedness Plan Page 1 of 4 2011 Colorado Wildfire Preparedness Plan  

E-Print Network (OSTI)

2011 Colorado Preparedness Plan Page 1 of 4 2011 Colorado Wildfire Preparedness Plan Recommendation to the Governor AUTHORIZATION: COLORADO REVISED STATUTE 23-31-309 The Wildfire Preparedness Fund in Colorado was authorized by the 2006 Legislature through Senate Bill 06-096, which also appropriated funding

399

UDAC 2014 Findings and Recommendations | Department of Energy  

Office of Environmental Management (EM)

2014 Findings and Recommendations UDAC 2014 Findings and Recommendations UDAC 2014 Findings and Recommendations More Documents & Publications Minutes from December 16, 2013 UDAC...

400

EM SSAB Recommendations and Letters - 2009-01 | Department of...  

Office of Environmental Management (EM)

272009) More Documents & Publications Recommendation 221: Recommendation Regarding Recycling of Metals and Materials EM SSAB Recommendations and Letters - 2014-03 EM SSAB...

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Low Dose Radiation Research Program: Original Research Program Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Original Research Program Plan Original Research Program Plan Biological Effects of Low Dose and Dose Rate Radiation Prepared for the Office of Biological and Environmental Research by The Low Dose Radiation Research Program Plan Subcommittee of the Biological and Environmental Research Advisory Committee. II. Table of Contents Face Page Table of Contents Executive Summary Introduction Program Outline Low Dose Radiation vs. Endogenous Oxidative Damage - The Same or Different? Key Question Description Decision Making Value Recommendations and Costs Understanding Biological Responses to Radiation And Endogenous Damage Key Question Description Decision Making Value Recommendations and Costs Thresholds for Low Dose Radiation - Fact or Fiction? Key Question Description Decision Making Value Recommendations and Costs

402

2014 Research & Study Abroad Program in Panama Recommendation Form and Guidelines  

E-Print Network (OSTI)

2014 Research & Study Abroad Program in Panama Recommendation Form. ================================================================ Evaluator Guidelines The Panama Research and Study Abroad program of Panama working with researchers of the Water Center for the Humid Tropics

Alabama in Huntsville, University of

403

Recommendation 212: Evaluate additional storage and disposal...  

Office of Environmental Management (EM)

212: Evaluate additional storage and disposal options Recommendation 212: Evaluate additional storage and disposal options The ORSSAB encourages DOE to evaluate additional storage...

404

Energy Assessment Results: Most Commonly Identified Recommendations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Results: Most Commonly Identified Recommendations The Missouri Industrial Assessment Center shares its experience providing energy assessments to local industry. Energy...

405

Buildings Performance Database Recommended Data Fields  

Energy.gov (U.S. Department of Energy (DOE))

Buildings Performance Database Recommended Data Fields, from the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

406

Recommendations to Address Power Reliability Concerns Raised...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Concerns Raised as a Result of Pending Environmental Regulations for Electric Generation Stations More Documents & Publications DOE Response to EAC Recommendations - March 2012...

407

Advisory Committee Recommends Continued Investment in Jefferson...  

NLE Websites -- All DOE Office Websites (Extended Search)

Advisory Committee Recommends Continued Investment in Jefferson Lab fellowship This aerial view of the Continuous Electron Beam Accelerator Facility shows the footprint of the...

408

Advisory Committee Recommends Continued Investment in Jefferson...  

NLE Websites -- All DOE Office Websites (Extended Search)

Advisory Committee Recommends Continued Investment in Jefferson Lab This aerial view of the Continuous Electron Beam Accelerator Facility shows the footprint of the accelerator and...

409

Recommendation 192: Comments on Remediation Effectiveness Report  

Energy.gov (U.S. Department of Energy (DOE))

The ORSSAB Recommendations and Comments on the Draft 2010 Remediation Effectiveness Report for the U.S. Department of Energy Oak Ridge Reservation.

410

Recommendation 207 : Automate the Stewardship Verification Process...  

Office of Environmental Management (EM)

recommends exploring ways to automate the stewardship tracking process and establish a web-based solution for managing long-term stewardship information for the Oak Ridge...

411

Recommended Security Controls for Federal Information Systems...  

NLE Websites -- All DOE Office Websites (Extended Search)

NIST 800-53 Revision 3 + Draft Revision 4 Recommended Security Controls for Federal Information Systems and Organizations Note: CNTL NO. Table D2: Security Control Base Lines...

412

Strategic Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

413

Pepco Update on Current Construction Work and Mirant Generation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Pepco Update on Current Construction Work and Mirant Generation Needs for...

414

Radiation protection for pregnant workers and their offspring: a recommended approach for monitoring  

Science Journals Connector (OSTI)

......The IAEA Basic Safety Standards present similar recommendations...IAEA) Basic Safety Standards (BSS)(1) state that...International Action Plan for Occupational Radiation...provides a detailed review of knowledge regarding...pregnant should provide a standard of protection for any......

Rodolfo Cruz-Suarez; Dietmar Nosske; Denison Souza-Santos

2011-03-01T23:59:59.000Z

415

Wildlife Category Review. NWPCC. Final Recommendation to BPA. July 2009 Attachment 1  

E-Print Network (OSTI)

years of proposed funding by the project sponsors. A five-year planning budget allows Bonneville Power Administration (Bonneville) and the sponsor flexibility in contracting and spending fluctuations over the five Northwest Power and Conservation Council Fish and Wildlife Project Funding Recommendations for the Wildlife

416

Elements of doing work at SSRL (rev  

NLE Websites -- All DOE Office Websites (Extended Search)

follow JHAMs, safety procedures, and work plans (e.g., non-routine JHAMs, equipment lockout procedures, and radiation safety work control forms). 2. Ensure STAs are up to date...

417

Putting Dollars to Work  

E-Print Network (OSTI)

the extent to which bacteria are present. If these data demonstrate the need for an assessment of total maximum daily loads, experts in bacterial source tracking will help plan and imple- ment appropriate follow-up. Dairy Compost Utilization... This project addresses the elevated concentrations of ammonia, nitrogen, phosphorus and fecal bacteria found in parts of the North Bosque River, Upper North Bosque River and Leon River. Texas A&M agricultural scientists are working with composters...

Wythe, Kathy

2006-01-01T23:59:59.000Z

418

DNFSB Recommendation 2010-2, Pulse Jet Mixing at the Waste Treatment and Immobilization Plant WTP  

NLE Websites -- All DOE Office Websites (Extended Search)

DNFSB Rec. 2010-2, Rev.0, Nov.10, 2011 DNFSB Rec. 2010-2, Rev.0, Nov.10, 2011 i Department of Energy Plan to Address Waste Treatment and Immobilization Plant Vessel Mixing Issues Revision 0 Implementation Plan for Defense Nuclear Safety Board Recommendation 2010-2 November 10, 2011 DNFSB Rec. 2010-2, Rev.0, Nov.10, 2011 ii EXECUTIVE SUMMARY On December 17, 2010, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 2010-2, Pulse Jet Mixing at the Waste Treatment and Immobilization Plant. The recommendation addressed the need for the U.S. Department of Energy (DOE) to ensure that the Hanford Waste Treatment and Immobilization Plant (WTP), in conjunction with the Hanford tank farm waste feed delivery system, will operate safely and effectively during a

419

Unallocated Off-Specification Highly Enriched Uranium: Recommendations for Disposition  

SciTech Connect

The U.S. Department of Energy (DOE) has made significant progress with regard to disposition planning for 174 metric tons (MTU) of surplus Highly Enriched Uranium (HEU). Approximately 55 MTU of this 174 MTU are ''offspec'' HEU. (''Off-spec'' signifies that the isotopic or chemical content of the material does not meet the American Society for Testing and Materials standards for commercial nuclear reactor fuel.) Approximately 33 of the 55 MTU have been allocated to off-spec commercial reactor fuel per an Interagency Agreement between DOE and the Tennessee Valley Authority (1). To determine disposition plans for the remaining {approx}22 MTU, the DOE National Nuclear Security Administration (NNSA) Office of Fissile Materials Disposition (OFMD) and the DOE Office of Environmental Management (EM) co-sponsored this technical study. This paper represents a synopsis of the formal technical report (NNSA/NN-0014). The {approx} 22 MTU of off-spec HEU inventory in this study were divided into two main groupings: one grouping with plutonium (Pu) contamination and one grouping without plutonium. This study identified and evaluated 26 potential paths for the disposition of this HEU using proven decision analysis tools. This selection process resulted in recommended and alternative disposition paths for each group of HEU. The evaluation and selection of these paths considered criteria such as technical maturity, programmatic issues, cost, schedule, and environment, safety and health compliance. The primary recommendations from the analysis are comprised of 7 different disposition paths. The study recommendations will serve as a technical basis for subsequent programmatic decisions as disposition of this HEU moves into the implementation phase.

Bridges, D. N.; Boeke, S. G.; Tousley, D. R.; Bickford, W.; Goergen, C.; Williams, W.; Hassler, M.; Nelson, T.; Keck, R.; Arbital, J.

2002-02-27T23:59:59.000Z

420

National Action Plan on Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan on Demand National Action Plan on Demand Action Plan on Demand National Action Plan on Demand Response Response Federal Utilities Partnership Working Group Federal Utilities Partnership Working Group November 18, 2008 November 18, 2008 Daniel Gore Daniel Gore Office of Energy Market Regulation Office of Energy Market Regulation Federal Energy Regulatory Commission Federal Energy Regulatory Commission The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission Presentation Contents Presentation Contents Statutory Requirements Statutory Requirements National Assessment [Study] of Demand Response National Assessment [Study] of Demand Response National Action Plan on Demand Response National Action Plan on Demand Response General Discussion on Demand Response and Energy Outlook

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Implemented Recommendations and Additional Accomplishments:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NATIONAL ENERGY POLICY ACHIEVEMENTS NATIONAL ENERGY POLICY ACHIEVEMENTS TRANSFORMING ENERGY TECHNOLOGY INITIATIVES Hydrogen Technology: In February 2003, you launched the Hydrogen Fuel Initiative to develop commercially viable hydrogen-powered fuel cells with no pollution or greenhouse gases. Combined with the FreedomCAR initiative, $1.7 billion has been proposed to develop hydrogen-powered fuel cells, hydrogen infrastructure and advanced automotive technologies. Carbon Sequestration Technologies: DOE launched FutureGen, a $1 billion demonstration project, in partnership with private industry, to develop the world's first coal-based, zero-emissions electricity and hydrogen power plant. The U.S. created the Carbon Sequestration Leadership Forum to work with other

422

Modeling user's receptiveness over time for recommendation  

Science Journals Connector (OSTI)

Existing recommender systems model user interests and the social influences independently. In reality, user interests may change over time, and as the interests change, new friends may be added while old friends grow apart and the new friendships formed ... Keywords: collaborative filtering, personalization, recommendation, social trust

Wei Chen; Wynne Hsu; Mong Li Lee

2013-07-01T23:59:59.000Z

423

Plant Pathogen Forensics: Capabilities, Needs, and Recommendations  

Science Journals Connector (OSTI)

...Automated text mining procedures need to...leverage community standards for implementation...small. A coordinated plan for increasing our...forensics develops, standard crime scene processing...national security plan that includes steps...Journal Article Review | Bioterrorism Forensic...

J. Fletcher; C. Bender; B. Budowle; W. T. Cobb; S. E. Gold; C. A. Ishimaru; D. Luster; U. Melcher; R. Murch; H. Scherm; R. C. Seem; J. L. Sherwood; B. W. Sobral; S. A. Tolin

2006-06-01T23:59:59.000Z

424

Policy & Strategic Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory Directed R&D Laboratory Directed R&D Office of Technology Commercialization and Partnerships Other Information BNL Site Index Can't View PDFs? Policy & Strategic Planning Directorate Policy and Strategic Planning (P&SP) Directorate coordinates development of the Laboratory Strategic Plan and annual business plans at the institutional and organizational Level. This function includes administration of the Laboratory Directed Research and Development (LDRD) program. The Directorate is also responsible for the Laboratory's technology transfer functions, including collaborations with industry and work for others; and for increasing funding from sources other than DOE. Organization Chart (pdf) Top of Page Last Modified: June 4, 2013 Please forward all questions about this site to: Teresa Baker

425

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

426

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

427

Milestone Plan Process Improvement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milestone Plan Process Improvement Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the STRIPES Project Office initiated an in-depth evaluation of the required steps and issues surrounding this process. We concluded that the MP process could be improved for most users by tuning the system configuration. With the approval of both the STRIPES Executive Steering Committee and the STRIPES Project Office, we launched the MP Process Improvement Initiative. After many meetings with members of the STRIPES Team and Working Group, we are ready to "go-live" with this initiative. On October 1 st , 2012 the new MP process will be implemented for use by most field offices.

428

Widget:GetRecommendations | Open Energy Information  

Open Energy Info (EERE)

GetRecommendations GetRecommendations Jump to: navigation, search This widget generates a list of recommended entries from OpenEI.org/search related to the page on which it is embedded or the given topic. Parameters element (required) = DOM element string, such as #recommendationDiv or .recommendationClass topic or url (required) topic = string to use to retrieve search results, such as "Solar" url = url string from a base of OpenEI.org/wiki/, such as "Gateway:Solar" Either topic or url is required. If both are provided, only topic will be used. randomizeResults (optional, default: false) = true or false to show differing results every time; default: true; this is done by expanding the result set and randomizing the rows that are returned type (optional) = an array of type and number of types to return

429

Congressional panel makes recommendations on belt safety  

SciTech Connect

The Mine Improvement and New Emergency Response Act of 2006 (MINER Act) called for a Technical Study Panel to present a review and make recommendations on the use of belt air and the composition and fire retardant properties of belt materials in underground coal mining. In October 2007 the Panel released 20 recommendations publicly. These are presented in the article. Many recommendations encouraged the MSHA to enforce existing laws of maintenance and fire protection or example more vigorously. Maybe the biggest change recommended was that the industry should adopt the Belt Evaluation Laboratory Test (BELT) standard proposed in 1992. Another important recommendation was one that would help eliminate hazards associated with point feeding. 1 photo.

Fiscor, S.

2007-12-15T23:59:59.000Z

430

Work Authorization System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, D.C. DOE O 412.1A Approved: 4-21-05 This directive was reviewed and certified as current and necessary by Susan J. Grant, Director, Office of Management, Budget and Evaluation/Chief Financial Officer, 4-21-05. SUBJECT: WORK AUTHORIZATION SYSTEM 1. OBJECTIVES. To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. 2. CANCELLATIONS. DOE O 412.1 Work Authorization System, dated 4-20-99. Cancellation of a directive does not, by itself, modify or otherwise affect any contractual

431

Inside this Issue Preventing Cancer: New Recommendations  

E-Print Network (OSTI)

Milk Just as Good as Plain Milk .......2 Green Tea: Is it Really Tonic in a Teapot? ......2 Planning

Garfunkel, Eric

432

DOE CONTRACTOR PENSION PLANS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-13 1-13 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental remediation, infrastructure services and other site-specific project completion contracts. DOE-H-1002 EMPLOYEE COMPENSATION: PAY AND BENEFITS (a) Contractor Employee Compensation Plan The Contractor shall submit, for Contracting Officer approval, by (fill-in

433

Task Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Plans Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting. Task Plan Number/Title DOE Lead Staff Last Update Comment Status/ New No. After 7/27/00 GP-1, Section 180(c) Coordination (begun 1/96) C. Macaluso 7/98 DOE published a Revised Proposed Policy and Procedures in April 1998; no final policy will be issued until a definitive date for NWPA shipments is determined, based on site suitability or other legislative direction. To the extent that any issues related to Section 180(c) arise in TEC meetings, they are being discussed in the context of the consolidated grant topic group which is covered by another task plan. Closed

434

Institutional Plan FY 2003 - 2007  

NLE Websites -- All DOE Office Websites (Extended Search)

Disclaimer Disclaimer While this document is believed to contain correct information, the United States Government nor any agency thereof makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that it would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by its trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. INSTITUTIONAL PLAN FY 2003 - 2007 INSTITUTIONAL PLAN FY 2003 - 2007 1 Table of Contents Page 1 Introduction

435

Biomedical Engineering Program Assessment Plan Biomedical Engineering Program Assessment Plan  

E-Print Network (OSTI)

1 Biomedical Engineering Program Assessment Plan Biomedical Engineering Program in science and mathematics to address engineering problems in a biomedical context. a. Demonstrate a working sciences. b. Demonstrate ability to apply basic science concepts as foundations to biomedical engineering

Cantlon, Jessica F.

436

La Comunidad del Futuro Hidalgo Comprehensive Plan: 2010  

E-Print Network (OSTI)

Developed conceptual designs for the Office Park and Mercado, Bridge Street, and Coma Street. Teams evaluated current zoning ordinances and made recommendations for the future. The comprehensive plan was formulated and prepared, providing...

Bond, Alsie; Carlson, Todd B.; Sanchez, J. Martin; Schumann, Gregory; Baker, Barton; Benthul, Bart; Biggs, John; Cervantes, Xavier; Cross, Shelia; Derkits, Janna; Gonzalez, Roberto; Head, Aric; McCoy, Michelle; Nance, Tara; Orr, Karen; Phillips, Kimberly; Schoonmaker, Scott; Sims, Stephens; Soltan, Laleh; Stevens, Thomas; Hahn, Mary; Teal, Mike; Wiruchaphan, Sani; Yang, Min-Fang; Pugh, David

1995-01-01T23:59:59.000Z

437

Business Plan Development Company Description  

E-Print Network (OSTI)

by the establishment of additional work stations. Raw materials purchasing and subsequent manufacturing need to be done purchasing and manufacturing under my personal name to-date. The concept of the device I patented market, marketing plan, web development, manufacturing plan to allow for maximum profit margin while

Dahl, David B.

438

Planning for Cities  

Science Journals Connector (OSTI)

... of the techniques-or the disciplines -which should by now inform the work even of pedestrian city planners. The fact that the planning study which has been carried out for ... s ahurch is an obvious need. Some skill has been spent on devices for separating pedestrians and wheeled traffic, chiefly by erecting ...

1968-11-23T23:59:59.000Z

439

Marketing Communications Plan for SKC  

E-Print Network (OSTI)

Marketing Communications graduate students at the University of Kansas worked with SKC, a unified communications integrator, to conduct primary and secondary research to develop a strategic marketing communications plan for the organization...

Cofer, Katie; Hester, Mai; Gregory, Chris; Schaub, Jenni

2014-09-03T23:59:59.000Z

440

NIST 3-Year Programmatic Plan  

E-Print Network (OSTI)

areas critical to the nation's economy.The America COMPETES Act outlines major roles for NIST-year period.NIST will continue to refine this plan as it works with the Administration to address national

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

DOE Response to 2012 EAC Recommendations - February 2013 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 EAC Recommendations - February 2013 2012 EAC Recommendations - February 2013 DOE Response to 2012 EAC Recommendations - February 2013 This memo from Assistant Secretary for Electricity Delivery and Energy Reliability Patricia Hoffman to the Electricity Advisory Committee provides the Department of Energy's response to the EAC's analyses and recommendations made in 2012. The memo and included documentation address EAC recommendations on the following topics: Recommendations on the Development of the Next Generation Grid Operating System, October 2012 Recommendations on Non-Wires Solutions, October 2012 Recommendations on Strategic Portable Generation Reserve, October 2012 Recommendations on the Electricity Workforce, October 2012 Recommendations on Next Steps for Smart Grid Outreach and Communications Strategy, October 2012

442

DOE Response to 2012 EAC Recommendations Available | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 EAC Recommendations Available 2 EAC Recommendations Available DOE Response to 2012 EAC Recommendations Available March 4, 2013 - 12:40pm Addthis Assistant Secretary Patricia Hoffman submitted a memo to the Electricity Advisory Committee providing DOE's response to six recommendation documents approved at the October 2012 EAC meeting. The memo and included documentation address EAC recommendations on the following topics: Recommendations on the Development of the Next Generation Grid Operating System, October 2012 Recommendations on Non-Wires Solutions, October 2012 Recommendations on Strategic Portable Generation Reserve, October 2012 Recommendations on the Electricity Workforce, October 2012 Recommendations on Next Steps for Smart Grid Outreach and Communications Strategy, October 2012

443

Performance Confirmation Plan  

SciTech Connect

As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that i s affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program.

Lindner, E.N.

2000-05-19T23:59:59.000Z

444

Environmental Implementation Plan  

SciTech Connect

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

Not Available

1994-02-01T23:59:59.000Z

445

ORISE: Operations Support and Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Securing the Golden State Amber Waves 2012 Bureau of Reclamation Emergency Management Issues Special Interest Group Golden Guardian Joint Information Center Preventing Nuclear Smuggling Program Training and Technology Support Resources How to Work With Us Contact Us Oak Ridge Institute for Science Education Operations Support and Planning Operations Support and Planning The Oak Ridge Institute for Science and Education (ORISE) provides operations and planning support to the U.S. Department of Energy (DOE), Federal Emergency Management Agency and other government agencies for their counterterrorism and emergency response readiness programs. ORISE's planning, logistical and administrative support areas are focused on enhancing the radiological preparedness and response coordination

446

Geothermal Technologies Program Blue Ribbon Panel Recommendations  

Energy.gov (U.S. Department of Energy (DOE))

This report describes the recommendations of the Geothermal Blue Ribbon Panel, a panel of geothermal experts assembled in March 2011 for a discussion on the future of geothermal energy in the U.S.

447

BUILDING 96 RECOMMENDATION FOR SOURCE AREA REMEDIATION  

E-Print Network (OSTI)

of the 1999 Operable Unit (OU) III Remedial Investigation/Feasibility Study(RI/FS) and was designated as AreaOU III BUILDING 96 RECOMMENDATION FOR SOURCE AREA REMEDIATION FINAL Prepared by: Brookhaven REMEDIATION Executive Summary

448

Microsoft Word - Final Recommendations.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Recommendations Recommendations Brookhaven National Laboratory Nuclear and Particle Physics Program Advisory Committee June 15-16, 2009 1. Introduction On June 15, 2009, the PAC heard background information on facility operation, experimental upgrades, possible signals of a QCD critical point as well as the PHENIX and STAR Beam Use Requests (BURs). Based on this input, we report our recommendations for Runs 10 and 11 with discussion of both heavy ion and polarized proton physics. We also comment on the status and prospects for machine and experimental upgrades, and conclude with comments about the preparation of future BURs. The recommendations of Section 2 are based on a total of 25 physics weeks, and involve a substantial period of running by only the STAR detector.

449

River Protection Project (RPP) Environmental Program Plan  

SciTech Connect

This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

POWELL, P.A.

2000-03-29T23:59:59.000Z

450

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

End Point Closeout Examples Example 77 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field representative will verify acceptable completion of the applicable activity. Verification may be performed by reviewing documents, letters, photos, work packages, or work plans, or by visual inspection. When all the endpoints for a specific area of the building have been completed and verified, designated BWHC and BHI management will sign for completion and acceptance of that

451

Secretary_s_Recommendation_Report.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendation by the Secretary of Energy Recommendation by the Secretary of Energy Regarding the Suitability of the Yucca Mountain Site for a Repository Under the Nuclear Waste Policy Act of 1982 February 2002 ii 1. Introduction............................................................................................................................... 1 2. Background ............................................................................................................................... 3 2.1. History of the Yucca Mountain Project and the Nuclear Waste Policy Act ............... 3 2.2. The Nuclear Waste Policy Act and the Responsibilities of the Department of Energy and the Secretary.................................................................................................. 5 3. Decision

452

Federal Flood Assessment Conference Recommendations and Proceedings  

E-Print Network (OSTI)

for Emergency Response Bureau of Reclamation Water Operations Coordination of River/Storage Releases American Canal diversion Federal Flood Assessment Conference Page 6 Proceedings and Recommendations Upstream diversion operation... Federal Flood Assessment Conference Page 20 Proceedings and Recommendations who is in charge during a response. The OSC determines the status of the local response and monitors the situation to determine whether, or how much, federal...

Reyes, Silvestre; Brock, Peter; Michelsen, Ari

2006-09-06T23:59:59.000Z

453

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System Closure Plan Examples System Closure Plan Examples Example 61 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field representative will verify acceptable completion of the applicable activity. Verification may be performed by reviewing documents, letters, photos, work packages, or work plans, or by visual inspection. When all the endpoints for a specific area of the building have been completed and verified, designated BWHC and BHI management will sign for completion and acceptance of that

454

Between a rock and a hard plan  

Science Journals Connector (OSTI)

......company policy changes, or regulatory and environmental changes...management failure. review work to date and have...You agree the top level plans and budget and once the...management books always say plan your business case...teams; managing project plans; and managing yourself......

Suzanna Marsh

2007-01-01T23:59:59.000Z

455

Recommendations for Long-term Stewardship  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Program implements the requirements of Section 110 of the NHPA. The Cultural Resources Management Plan (CRMP) for the DOE ORR in Anderson and Roane Counties, DOE...

456

Going To Work: Work Relationships  

E-Print Network (OSTI)

One of a worker's top goals should be to develop good relationships with coworkers and supervisers. This publication discusses five general rules for building good relationships at work and offers advice on handling criticism....

Hoffman, Rosemarie

2000-07-20T23:59:59.000Z

457

CORPORATE AND STRATEGIC PLANNING Faculty planning workbook  

E-Print Network (OSTI)

.............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 ­ 2012/13 #12

458

Proactive Planning  

E-Print Network (OSTI)

, rainwater harvesting, stream bank stabilization, and educational programs to prevent urban and agricultural nonpoint source pollution. Project leaders plan to have the Cedar Creek Watershed Protection Plan finalized by the summer of 2008. ?We... on watershed management, stream restoration practices, agricultural best man- agement practices, rainwater harvesting, non- point source pollution control, on-site septic system maintenance, and other water quality issues facing urban and rural...

Wythe, Kathy

2008-01-01T23:59:59.000Z

459

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Baselines - Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP) for WBS 1.4 (FDH 1998). These cost and schedule details will provide the basis for a baseline change request that will be processed to revise the MYWP, consistent with the accelerated project plan presented below. 6.1 Project Baseline Overview This section of the IPMP presents the PFP baseline cost and schedule summary. The currently approved PFP Stabilization and

460

Customer Service Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Customer Service Plan Department of Energy Customer Service Plan - 2011 1 A Message from the Secretary Over the past two and a half years, the Obama Administration and the Department of Energy have worked to make the federal government more open for the American public and its own employees. Through these efforts, we have significantly expanded the amount and breadth of information available online about our programs and services. We have also transformed the way we communicate with the public by relaunching Energy.gov, making it an interactive, streamlined information platform. In April, President Obama directed federal agencies to take this ongoing effort one step further and establish Customer Service Plans, improving the public's interactions with the

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

DAF Glovebox Project Plan  

SciTech Connect

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

462

Targeting Net Zero Energy at Fort Carson: Assessment and Recommendations  

NLE Websites -- All DOE Office Websites (Extended Search)

Targeting Net Zero Targeting Net Zero Energy at Fort Carson: Assessment and Recommendations Prepared for the U.S. Department of Energy Federal Energy Management Program By National Renewable Energy Laboratory Kate Anderson, Tony Markel, Mike Simpson, John Leahey, Caleb Rockenbaugh, Lars Lisell, Kari Burman, and Mark Singer October 2011 ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents

463

Water quality management plan for Cherokee Reservoir  

SciTech Connect

The management plan provides an assessment of Cherokee Reservoir's current water quality, identifies those factors which affect reservoir water quality, and develops recommendations aimed at restoring or maintaining water quality at levels sufficient to support diverse beneficial uses. 20 references, 8 figures, 15 tables. (ACR)

Not Available

1984-01-01T23:59:59.000Z

464

Microsoft Word - CARES 2010.Science Plan.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 CARES: Carbonaceous Aerosol and Radiative Effects Study Science Plan May 2010 RA Zaveri Principal Investigator WJ Shaw DJ Cziczo DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

465

AEDG Implementation Recommendations: Daylighting Controls | Building Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Controls Controls The Advanced Energy Design Guide (AEDG) for Small Office Buildings, 30% series, seeks to achieve 30% savings over ASHRAE Standard 90.1-1999. This guide focuses on improvements to small office buildings, less than 20,000ft2. The recommendations in this article are adapted from the implementation section of the guide and focus on expanded recommendations for daylighting controls; photo sensor placement; calibration and commissioning; daylight levels. Publication Date: Wednesday, May 13, 2009 air_daylighting_controls.pdf Document Details Affiliation: DOE BECP Focus: Compliance Building Type: Commercial Code Referenced: ASHRAE Standard 90.1-1999 Document type: AEDG Implementation Recommendations Target Audience: Architect/Designer Builder Contractor Engineer

466

NATIONAL ENERGY POLICY SUMMARY OF RECOMMENDATIONS  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMMARY SUMMARY OF RECOMMENDATIONS 5 The NEPD Group recommends that the President issue an Executive Order to di- rect all federal agencies to include in any regulatory action that could significantly and adversely affect energy supplies, distribution, or use, a detailed statement on: (1) the energy impact of the proposed action, (2) any adverse energy effects that cannot be avoided should the proposal be implemented, and (3) alternatives to the proposed ac- tion. The agencies would be directed to include this statement in all submissions to the Office of Management and Budget of proposed regulations covered by Executive Order 12866, as well as in all notices of proposed regulations published in the Federal Register. 5 The NEPD Group recommends that the President direct the executive agencies to

467

The following rubric is being used for the Assessment and Outcomes Committee's (AOC) comprehensive content review of departmental assessment plans and reports. Plans are divided into 5 major categories with comments and  

E-Print Network (OSTI)

content review of departmental assessment plans and reports. Plans are divided into 5 major categories://www.montana.edu/wwwprov/assessment/assessmentplans.htm). The "Recommended Items" are elements that the reviewers believe would further improve many plans, and are already with comments and a grade for each category, and an overall grade for the plans. The elements listed

Maxwell, Bruce D.

468

Hazmat Team Planning Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA 540/G-90/003 EPA 540/G-90/003 Directive: 9285.3-05 September 1990 Hazmat Team Planning Guidance Office of Emergency and Remedial Response U.S. Environmental Protection Agency Washington, DC 20460 NOTICE The policies and procedures set forth in this document are intended solely to provide guidance. This guidance does not constitute rulemaking by the U.S. Environmental Protection Agency (EPA), and may not be relied on to create a substantive or procedural right enforceable by any party in litigation with the United States. EPA may take action that is at variance with the policies and procedures in these guidelines and may change them at any time without public notice. The mention of trade names or commercial products in this manual is for illustration purposes and does not constitute endorsement or recommendation for use by EPA. Cost

469

Working Copy  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Effective Date: 11/05/13 WP 12-IS.01-6 Revision 10 Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls Cognizant Section: Industrial Safety/Industrial Hygiene Approved By: Tom Ferguson Working Copy Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls WP 12-IS.01-6, Rev. 10 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 7 ACRONYMS AND ABBREVIATIONS ............................................................................. 8 1.0 INTRODUCTION 1 ............................................................................................... 10 2.0 VISITORS ........................................................................................................... 11

470

2033 Long Range Transportation Plan and FY 2010-2013 Transportation Improvement Program  

E-Print Network (OSTI)

of the Civil Rights Act of 1964 (Title VI), and the President?s Executive Order on Environmental Justice (EJ). Included in this LRP is a financial plan for implementing recommended projects. The financial plan was developed by the West Memphis MPO... and evaluate the effect on projected land use trends and the Area Transportation Plan or subsequent land use plans. ? Review requests for changing the West Memphis Land Use Plan. 3. Citizens Advisory Committee The Citizens Advisory Committee will advise...

The West-Memphis Metropolitan Planning Organization

471

Recommended plutonium release fractions from postulated fires. Final report  

SciTech Connect

This report was written at the request of EG&G Rocky Flats, Inc. in support of joint emergency planning for the Rocky Flats Plant (RFP) by EG&G and the State of Colorado. The intent of the report is to provide the State of Colorado with an independent assessment of any respirable plutonium releases that might occur in the event of a severe fire at the plant. Fire releases of plutonium are of interest because they have been used by EG&G to determine the RFP emergency planning zones. These zones are based on the maximum credible accident (MCA) described in the RFP Final Environmental Impact Statement (FEIS) of 1980, that MCA is assumed to be a large airplane crashing into a RFP plutonium building.The objective of this report was first, to perform a worldwide literature review of relevant release experiments from 1960 to the present and to summarize those findings, and second, to provide recommendations for application of the experimental data to fire release analyses at Rocky Flats. The latter step requires translation between experimental and expected RFP accident parameters, or ``scaling.`` The parameters of particular concern are: quantities of material, environmental parameters such as the intensity of a fire, and the physico-chemical forms of the plutonium. The latter include plutonium metal, bulk plutonium oxide powder, combustible and noncombustible wastes contaminated with plutonium oxide powder, and residues from plutonium extraction processes.

Kogan, V.; Schumacher, P.M.

1993-12-01T23:59:59.000Z

472

Recommender Information | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Recommender Information Recommender Information Albert Einstein Distinguished Educator Fellowship (AEF) Program Einstein Fellowship Home Eligibility Benefits Obligations How to Apply Recommender Information Application Review and Selection Process Key Dates Frequently Asked Questions Contact WDTS Home How to Apply Recommender Information Print Text Size: A A A RSS Feeds FeedbackShare Page For Recommenders Letters of recommendation are due before December 4, 2013, at 5:00PM EST. A completed Einstein Fellowship application requires letters of recommendation from three individuals familiar with the applicant's professional and education background and their experience, aptitude, or promise relevant to the Einstein Fellowship program. Applicants are responsible for sending the recommendation request to

473

DOE Responds to Advisory Board Recommendation | Department of...  

Energy Savers (EERE)

Board Recommendation August 12, 2014 - 1:37pm Addthis The Department of Energy's (DOE) Oak Ridge Office of Environmental Management (EM) has responded to a recommendation made...

474

Recommendation 208 : Use White Paper on Oak Ridge Reservation...  

Office of Environmental Management (EM)

8 : Use White Paper on Oak Ridge Reservation Recommendation 208 : Use White Paper on Oak Ridge Reservation The ORSSAB approved the enclosed recommendation suggesting DOE Oak Ridge...

475

Recommendation 217: Stewardship Point of Contact for the Oak...  

Office of Environmental Management (EM)

Recommendation 217: Stewardship Point of Contact for the Oak Ridge Reservation Recommendation 217: Stewardship Point of Contact for the Oak Ridge Reservation The Oak Ridge Site...

476

LED LUMINAIRE LIFETIME: Recommendations for Testing and Reporting...  

Office of Environmental Management (EM)

LED LUMINAIRE LIFETIME: Recommendations for Testing and Reporting LED LUMINAIRE LIFETIME: Recommendations for Testing and Reporting 2011 Solid-State Lighting Product Quality...

477

Recommendation by the Secretary of Energy Regarding the Suitability...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendation by the Secretary of Energy Regarding the Suitability of the Yucca Mountain Site for a Repository Under the Nuclear Waste Policy Act of 1982 Recommendation by the...

478

EAC Recommendations for DOE Action Regarding Consumer Acceptance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6,...

479

Recommended Best Practices for the Characterization of Storage...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Recommended Best Practices for the Characterization of Storage Properties of Hydrogen Storage Materials Recommended Best Practices for the Characterization of Storage Properties of...

480

Briefing: Summary and Recommendations of EM Landfill Workshop...  

Office of Environmental Management (EM)

Briefing: Summary and Recommendations of EM Landfill Workshop Briefing: Summary and Recommendations of EM Landfill Workshop The briefing is an independent technical review report...

Note: This page contains sample records for the topic "work plan recommendations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Recommended strategy for the disposal of remote-handled transuranic waste  

SciTech Connect

The current baseline plan for RH TRU (remote-handled transuranic) waste disposal is to package the waste in special canisters for emplacement in the walls of the waste disposal rooms at the Waste Isolation Pilot Plant (WIPP). The RH waste must be emplaced before the disposal rooms are filled by contact-handled waste. Issues which must be resolved for this plan to be successful include: (1) construction of RH waste preparation and packaging facilities at large-quantity sites; (2) finding methods to get small-quantity site RH waste packaged and certified for disposal; (3) developing transportation systems and characterization facilities for RH TRU waste; (4) meeting lag storage needs; and (5) gaining public acceptance for the RH TRU waste program. Failure to resolve these issues in time to permit disposal according to the WIPP baseline plan will force either modification to the plan, or disposal or long-term storage of RH TRU waste at non-WIPP sites. The recommended strategy is to recognize, and take the needed actions to resolve, the open issues preventing disposal of RH TRU waste at WIPP on schedule. It is also recommended that the baseline plan be upgraded by adopting enhancements such as revised canister emplacement strategies and a more flexible waste transport system.

Bild, R.W. [Sandia National Lab., Albuquerque, NM (United States). Program Integration Dept.

1994-07-01T23:59:59.000Z

482

Pedestrian and Bicycle Safety Strategies for UC Berkeley Campus and Periphery: Recommendations for Implementation  

E-Print Network (OSTI)

Sustainability Plan (2009) Climate Action Plan (2009) Landscape Master Plan (2004) New Century Plan (2003) College

Schneider, Robert J.; Grembek, Offer; Braughton, Matthew; Orrick, Phyllis; Ragland, David R.

2013-01-01T23:59:59.000Z

483

Microsoft Word - EXEC-2010-008725_2- Implementation Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Plan for Implementation Plan for the 29 Recommendations of the Protective Force Career Options Study Group Report to Congress January 2011 U.S. Department of ENERGY United States Department of Energy Washington, DC 20585 Department of Energy |January 2011 Implementation Plan for the 29 Recommendations of the Protective Force Career Options Study Group| Page ii Message from the Secretary of Energy and the Administrator of the National Nuclear Security Administration The Conference Report of the Fiscal Year 2010 National Defense Authorization Act requests the Secretary of Energy and the Administrator of the National Nuclear Security Administration to develop a comprehensive, Department of Energy (DOE)-wide plan to implement the recommendations of the June 30, 2009, DOE Career Options Study Group report, Enhanced

484

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 7.1 (May 2012 second revision) Chapter 7.1 (May 2012 second revision) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

485

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-Chapter 7.1 (May 2012) -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

486

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2011) January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

487

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OCTOBER 2010) OCTOBER 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

488

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PLANNING PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 6 Competition Requirements 4. FAR Part 7 Acquisition Planning 5. FAR Part 8 Required Sources of Supply 6. FAR Part 9 Contractor Qualifications 7. FAR Part 10 Market Research 8. FAR Part 11 Describing Agency Needs 9. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 10. FAR Subpart 16.1 Selecting Contract Types 11. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 12. FAR 17 Special Contracting Methods 13. FAR Part 19 Small Business Programs 14. FAR 25.802(a)(2) Other International Agreements and Coordination 15. FAR 34.004 Acquisition Strategy

489

Streamlined Approach for Environmental Restoration Work Plan for Corrective Action Unit 461: Joint Test Assembly Sites and Corrective Action Unit 495: Unconfirmed Joint Test Assembly Sites Tonopah Test Range, Nevada  

SciTech Connect

This Streamlined Approach for Environmental Restoration plan addresses the action necessary for the clean closure of Corrective Action Unit 461 (Test Area Joint Test Assembly Sites) and Corrective Action Unit 495 (Unconfirmed Joint Test Assembly Sites). The Corrective Action Units are located at the Tonopah Test Range in south central Nevada. Closure for these sites will be completed by excavating and evaluating the condition of each artillery round (if found); detonating the rounds (if necessary); excavating the impacted soil and debris; collecting verification samples; backfilling the excavations; disposing of the impacted soil and debris at an approved low-level waste repository at the Nevada Test Site

Jeff Smith

1998-08-01T23:59:59.000Z

490

Recommended Practice: Defense-in-Depth  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report # INL/EXT-06-11478 Report # INL/EXT-06-11478 Control Systems Cyber Security: Defense in Depth Strategies May 2006 Prepared by Idaho National Laboratory Recommended Best Practice: Defense in Depth 2 Table of Contents Keywords............................................................................................................................. 3 Introduction......................................................................................................................... 3 Background ......................................................................................................................... 3 Overview of Contemporary Control System Architectures................................................. 4 Security Challenges in Control Systems .............................................................................