National Library of Energy BETA

Sample records for woertz senior project

  1. Senior Project Evaluation Rubric: In the course of the senior

    E-Print Network [OSTI]

    Plotkin, Joshua B.

    Senior Project Evaluation Rubric: In the course of the senior design project students will be evaluated on their ability to: Exemplary Proficient Fair Poor Identify and analyze the technical challenges posed by a significant research or implementation project. The student is able to define and articulate

  2. 2009 Senior Thesis Project Reports Iliano Cervesato

    E-Print Network [OSTI]

    and the students' advisors. Abstract This technical report retrospectively collects the final reports2009 Senior Thesis Project Reports Iliano Cervesato Majd Sakr Mark Stehlik Brett Browning. The editors of this report include the members of the Senior Thesis Committee on the Qatar campus

  3. Senior Capstone Projects Spring 2015

    E-Print Network [OSTI]

    Sobek II, Durward K.

    30 plastic injection molding machines which produce products and components for the Blackhawk! brand is produced using ten dedicated molding machines followed by assembly and packaging operations. The project, they have contracted out much of their sewing operations to contract manufacturers at different locations

  4. Senior Capstone Projects Spring 2010

    E-Print Network [OSTI]

    Sobek II, Durward K.

    Project: Design for One-Piece Flow in Holster Assembly Contact: Darrin Stevens, Production Manager Black for the assembly and packaging area to implement one-piece flow and increase capacity to 25,000 products per week of Production Flow in an Industrial Sewing Operation Contact: Nikki Tuss Mystery Ranch Bozeman, MT 59715

  5. Senior Design Evaluation Rubric: Technical Communication This develops the CIS Senior Design rubric criterion, "In the course of the senior design project, students will be evaluated on their

    E-Print Network [OSTI]

    Plotkin, Joshua B.

    Senior Design Evaluation Rubric: Technical Communication This develops the CIS Senior Design rubric criterion, "In the course of the senior design project, students will be evaluated on their ability revision. · To evaluate the final project. · To measure departmental progress toward expected outcomes

  6. Senior Debt Fastball Presentation

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Senior Debt Fastball Presentation Phillip Thomas, Senior Vice President of Commercial Lending, Heartland Bank

  7. INTERDISCIPLINARY ENGINEERING DESIGN PROGRAM | AN INDUSTRY-UNIVERSITY PARTNERSHIP Showcasing innovative, real-world senior projects by UA engineering

    E-Print Network [OSTI]

    Wong, Pak Kin

    TABLE OF CONTENTS Engineering Design Day 2015 #12;10 a.m. ­ 4 p.m. Senior Engineering Design Day Project

  8. MAE 434W/435 Senior Design Project Fall 2014-Spring 2015

    E-Print Network [OSTI]

    MAE 434W/435 Senior Design Project Fall 2014-Spring 2015 Title: 2015 SAE Aero Design East Description: The SAE Aero Design competition is intended to provide undergraduate and graduate engineering://www.youtube.com/watch?v=lgPCWPGJlHE If the link doesn't work just type in key words "ODU 2014 Aero East" More information may be found from SAE

  9. CRN 94364 Vlachos: AEThER biomedical and bioinspired senior design projects Capacity 15

    E-Print Network [OSTI]

    Battaglia, Francine

    Kirk: Turbocharger Design Capacity 8 This project will be a continuation of the turbocharger analysis turbocharger including collecting vibration data, the students will do one or more of the following design content tasks: Design a new bearing concept for the turbocharger Design new improved fixtures for checking

  10. Senior energy savers: A how-to guide for organizing local weatherization projects

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    A step-by-step manual developed to assist community groups in organizing local energy conservation volunteer campaigns. Includes sections on local project organization, management and daily operation, volunteer management and training, low-cost weatherization, community energy education, working with the elderly, and publicity and program evaluation. Also included are training and education materials to instruct volunteers on low-cost/no-cost methods for saving energy.

  11. FY 2015 Senior Executive Service (SES) and Senior Professional...

    Energy Savers [EERE]

    FY 2015 Senior Executive Service (SES) and Senior Professional (SP) Performance Appraisal Opening Guidance FY 2015 Senior Executive Service (SES) and Senior Professional (SP)...

  12. Junior standing Senior standing

    E-Print Network [OSTI]

    Huang, Haiying

    Junior standing Senior standing BBA - Marketing Course Flow Undergraduate Catalog ­ 2005-2007 Math advising appointment. Attention: Busa/Mana 4322 ­ Organizational Strategy requires senior standing and all

  13. SENIOR HONORS THESIS CONTRACT Honors Student Name: Student ID

    E-Print Network [OSTI]

    Lawrence, Rick L.

    SENIOR HONORS THESIS CONTRACT HONR 490 Honors Student Name: Student ID: Date Submitted: The Senior Honors Thesis is an independent research/creativity project that enables Honors students to synthesize. At the completion of the Senior Honors Thesis, a public presentation of your work is required. A copy of the thesis

  14. Junior standing Senior standing

    E-Print Network [OSTI]

    Huang, Haiying

    Junior standing Senior standing BBA - Marketing Course Flow Math 1315 or equivalent Math 1316 in a course. Attention: Mana 4322 ­ Organizational Strategy requires senior standing and all business core

  15. Junior standing Senior standing

    E-Print Network [OSTI]

    Huang, Haiying

    Junior standing Senior standing BBA - Marketing Course Flow Math 1302 or 1315 or equivalent Math: Busa/Mana 4322 ­ Organizational Strategy requires senior standing and all business core courses

  16. Senior Capstone Projects Spring 2014

    E-Print Network [OSTI]

    Sobek II, Durward K.

    housing sector. They have a fairly diverse line of product for which they mold the clay, cut it into tile a contract with a major national distributor, and expect sales volume for several product lines to grow Manhattan, MT 59741 Description: Plastic Design and Manufacturing (PDM) is a plastic injection molding shop

  17. FY 2015 Senior Executive Service (SES) and Senior Professional...

    Broader source: Energy.gov (indexed) [DOE]

    The FY 2015 performance appraisal cycle for both SES and SP members, which includes Senior Level (SL) and Scientific or Professional (ST) employees, concludes on September 30,...

  18. "Dusty Muffins": Senior Women's Performance of Sexuality 

    E-Print Network [OSTI]

    Nasir, Evleen

    2012-10-19

    There is a discursive formation of incapability that surrounds senior women's sexuality. Senior women are incapable of reproduction, mastering their bodies, or arousing sexual desire in themselves or others. The senior actresses' I explore...

  19. AC 2010-1901: NASA SENIOR DESIGN: SYSTEMS ENGINEERING AND REUSABLE AVIONICS

    E-Print Network [OSTI]

    Conrad, James M.

    AC 2010-1901: NASA SENIOR DESIGN: SYSTEMS ENGINEERING AND REUSABLE AVIONICS James Conrad intelligence, and engineering education. © American Society for Engineering Education, 2010 #12;NASA Senior so that the students were able to meet nearly all of the project requirements. NASA Faculty Fellow

  20. Program Analyst (Senior Program Analyst)

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as Senior Program Analyst in the NNSA Information Assurance Response Center Cyber Intelligence Unit (IARC CIU), as the IARC CIU Supervisory...

  1. Karl R. Helfrich Senior Scientist

    E-Print Network [OSTI]

    Helfrich, Karl R.

    . W. Miles, 1984. On interfacial solitary waves over variable top- ography. Journal of Fluid MechanicsKarl R. Helfrich Senior Scientist Bigelow Chair for Excellence in Oceanography Department of Technology, 1985 Postdoctoral Investigator, 1985, Department of Civil Engineering, Massachusetts Institute

  2. Jimmy Winkler SRNS Senior Technical Advisor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesse Bergkamp Graduate student Subtask 4 project:Jimmy Winkler SRNS Senior

  3. The biomechanical demands of standing yoga poses in seniors: The Yoga empowers seniors study (YESS)

    E-Print Network [OSTI]

    2013-01-01

    demands among standing yoga poses: Descriptive/Comparativebiomechanical demands of standing yoga poses in seniors: Thebiomechanical demands of standing yoga poses in seniors: The

  4. Formatting Your Senior Project Get started!

    E-Print Network [OSTI]

    Arnold, Elizabeth A.

    at the bottom right of the dialog box. #12;Overall Formatting Guidelines Margins · Set all margins to 1 inch (top, bottom, left and right) · Set Header and Footer to .5 inch Font · Set size at 12 points · Choose Courier New, Times New Roman, Arial, Garamond, or Century Schoolbook. Alignment · Align text LEFT only

  5. Julia Maddock Senior Press Officer

    E-Print Network [OSTI]

    Julia Maddock Senior Press Officer #12;Corporate Planning and Communication Directorate Staff 31 Relations : Peter Barratt Press Officers : Gill Ormrod (until end December) Julia Maddock Natalie Bealing;Channel Activities · Media Relations Press Releases (Database + AlphaGalileo/Eurekalert/AAAS) Journalist

  6. Junior Intermediate Senior Chiefland Hardware &

    E-Print Network [OSTI]

    Hill, Jeffrey E.

    Junior Intermediate Senior Chiefland Hardware & Farm Supply Williston Ace Hardware Bronson Ace Hardware #12;#12;MAP OF YOUR GARDEN ROWS RUN NORTH TO SOUTH BETWEEN ROW SPACING WITHIN ROW PLANT SPACING, and pesticides for growing a garden 20 feet by 26 feet and is donated by BRONSON, WILLISTON ACE HARDWARE

  7. CHEMISTRY SENIORS ANNUAL PRIZE COMPETITIONS

    E-Print Network [OSTI]

    Vertes, Akos

    (Analytical, Inorganic, Organic, and Physical) in chemistry. The Byrne Thurtell Burns Memorial PrizeCHEMISTRY SENIORS ANNUAL PRIZE COMPETITIONS Each spring the Chemistry Department sponsors a competition for two large monetary prizes to be awarded to graduating chemistry majors on Commencement weekend

  8. Guidelines and Policy For MET Senior Thesis

    E-Print Network [OSTI]

    Wang, Yuqing

    Guidelines and Policy For MET Senior Thesis ________________________ Spring, 2013 Dateline #12 your senior thesis is an official addition to the body of scholarship and research undertaken at UH, we provide this document as a guide for its preparation and submission. Your senior thesis advisor

  9. Senior Space Camp 2015, Andya Space Center, Norway Senior Space Camp 2015

    E-Print Network [OSTI]

    Gerhardy, Philipp

    Senior Space Camp 2015, Andøya Space Center, Norway Senior Space Camp 2015 Arrangører: Nasjonalt deltakere Sted: Andøya Space Center (ASC), Andøya, Norway Undervisning: Programmet er delt mellom, Andøya Space Center, Norway FORELESERE / ADMINISTRASJON Tittel Etternavn Fornavn Initialer Organisasjon

  10. Honors in Mathematics Writing a Senior Thesis

    E-Print Network [OSTI]

    Honors in Mathematics Writing a Senior Thesis (2015-2016) Candidacy for Honors To receive honors in Mathematics, a student must submit a senior thesis. This is the only requirement for honors eligibility, beyond basic requirements of the Mathematics concentration. The Mathematics Department recommends

  11. Senior DOE Official to Host Press Call on Electricity Advisory...

    Office of Environmental Management (EM)

    Senior DOE Official to Host Press Call on Electricity Advisory Committee's New Reports Senior DOE Official to Host Press Call on Electricity Advisory Committee's New Reports...

  12. Senior Adviser Richard Kauffman to Host Live Chat on Renewable...

    Office of Environmental Management (EM)

    Senior Adviser Richard Kauffman to Host Live Chat on Renewable Energy Innovation and Deployment Senior Adviser Richard Kauffman to Host Live Chat on Renewable Energy Innovation and...

  13. POLICY MEMORANDUM #1 Policy and Operating Procedures for Senior...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MEMORANDUM 1 Policy and Operating Procedures for Senior Executive Service (SES) Performance Management System POLICY MEMORANDUM 1 Policy and Operating Procedures for Senior...

  14. EECBG Success Story: Saving Energy and Keeping Seniors Warm This...

    Office of Environmental Management (EM)

    of Chris Galm, Energy Department. The Greater Randolph Senior Center in Bexar County, Texas and Rockville Senior Center in Rockville, Maryland received energy efficiency...

  15. Senior Technical Safety Manager Qualification Program Self-Assessment...

    Office of Environmental Management (EM)

    Senior Technical Safety Manager Qualification Program Self-Assessment - Chief of Nuclear Safety Senior Technical Safety Manager Qualification Program Self-Assessment - Chief of...

  16. Safety for Senior Farmers and Ranchers 

    E-Print Network [OSTI]

    Smith, David

    2006-04-24

    Agriculture is among the most dangerous industries. Being alert and understanding the physical challenges that come with aging is the key to successful, safe farming by senior farmers and ranchers. The changes they make in work tasks and activities...

  17. ADMINSTRATION & FINANCE Senior Vice President

    E-Print Network [OSTI]

    Li, Mo

    Advanced Technology Ventures, Inc. Project Accounting Cost Accounting Rate Studies Negotiations Salary INSTITUTE OF TECHNOLOGY OFFICE OF FINANCIAL SERVICES Updated 6/12/14 #12;

  18. Robust processing of optical flow of fluids Ashish Doshi and Adrian G. Bors, Senior Member, IEEE

    E-Print Network [OSTI]

    Bors, Adrian

    to the change of illumination, image noise and the perspective projection when representing a 3-D scene in a 2-D1 Robust processing of optical flow of fluids Ashish Doshi and Adrian G. Bors, Senior Member, IEEE changing patterns which poses chal- lenges to existing optical flow estimation methods. The proposed

  19. SOHO: Tracking a Solar Cycle A Proposal to the 2003 Senior Review

    E-Print Network [OSTI]

    Christian, Eric

    SOHO: Tracking a Solar Cycle A Proposal to the 2003 Senior Review of Sun-Earth Connections, US Project Scientist for SOHO I. Executive Summary The current complement of Sun-Earth Connections, from the deep interior of the Sun to the borders of interplanetary space. Until the advent

  20. Retrospective on the Seniors' Council Tier 1 LDRD portfolio.

    SciTech Connect (OSTI)

    Ballard, William Parker

    2012-04-01

    This report describes the Tier 1 LDRD portfolio, administered by the Seniors Council between 2003 and 2011. 73 projects were sponsored over the 9 years of the portfolio at a cost of $10.5 million which includes $1.9M of a special effort in directed innovation targeted at climate change and cyber security. Two of these Tier 1 efforts were the seeds for the Grand Challenge LDRDs in Quantum Computing and Next Generation Photovoltaic conversion. A few LDRDs were terminated early when it appeared clear that the research was not going to succeed. A great many more were successful and led to full Tier 2 LDRDs or direct customer sponsorship. Over a dozen patents are in various stages of prosecution from this work, and one project is being submitted for an R and D 100 award.

  1. Session 6: Integrated Product Development and Project Management Hotel Monaco (Vienna rm) 501 Geary St San Francisco, CA April 14-17, 2014

    E-Print Network [OSTI]

    Soloveichik, David

    D, Senior Vice President, Project Management and Pharmaceutical Sciences, Endo Time Duration Topic 7:30 am and Overview of Day 1 Charles Gombar, PhD, Senior Vice President, Project Management and Pharmaceutical 15 Chairperson: Charles Gombar, PhD, Senior Vice President, Project Management and Pharmaceutical

  2. Senior Olympians achievement goals and beliefs concerning success

    E-Print Network [OSTI]

    Newton, Maria; Fry, Mary D.

    1998-01-01

    The purpose of this study was to examine the motivational perspectives of athletes participating in the Senior Olympic Games. One hundred thirty-seven senior athletes (54 males. 82 females, and 1 nonidentifier) completed ...

  3. SENIOR SCHOOL welcomes you to the ,

    E-Print Network [OSTI]

    Chong, Edwin K. P.

    ·'·^f Reflection Mr. M. Brown '-^^ Reading from Scripture Chris Barnett Petitions Jane Spurting 10.6 Regina Crameri 10.7 Nicholas Slaughter 10.8 Belinda McClory 10.9 Angela Barnett Year 11 11 Barnett #12;Sacred Heart College Senior School PATRONS His Grace, the A

  4. Conditional Offer Letter Executive/Senior Administrative

    E-Print Network [OSTI]

    Acton, Scott

    Conditional Offer Letter Web Form Executive/Senior Administrative University Staff Introduction below will generate a standard conditional offer letter based on information entered by the user. This conditional offer letter web form is specific to the hiring of E&SA University Staff employees

  5. Angel Huerta Senior Food Service Worker

    E-Print Network [OSTI]

    Gleeson, Joseph G.

    , to keep food waste and costs to a minimum, saving the dept. approximately $4,000 to date. He worksAngel Huerta Senior Food Service Worker Resource Management and Planning: Early Childhood Education of all backgrounds, it participates in the Child and Adult Care Food Program (CACFP). The CACFP provides

  6. The senior year experience at Texas A&M University: graduating seniors make meaning of their undergraduate education 

    E-Print Network [OSTI]

    de Rodriguez, Vanessa Diaz

    2009-05-15

    The purpose of this study was to identify if and how graduating seniors make meaning of their undergraduate education by exploring graduating seniors’ understanding of their undergraduate education, as well as what Texas ...

  7. Senior Project Conference 2013 Department of Mechanical Engineering

    E-Print Network [OSTI]

    of a large outdoor menorah, systems of drone aircraft to fight forest fires, control of unmanned surface

  8. Monday, May 5, 2014 2014 Senior Design Projects

    E-Print Network [OSTI]

    , EPIC / EpiPen® Calls 10 minute break Presentations, Session Ill & working lunch Team 18, Portable Solar Energy Harvester Team 7, EDS Power Management System Team 5, Fire Scout Team 6, Autonomous Survivor Identification Vehicle 5 minute break Presentations, Session lV Team 11, Home HVAC Automation Team 16, OnTi

  9. Flowserve Senior Design Project John Lesser, Todd Githens, Kong Moua

    E-Print Network [OSTI]

    Demirel, Melik C.

    was sponsored by Flowserve Co., a manufacturer of large, industrial pumps. These pumps have bearings for the bearing's lubricating oil. Due to thermal stratification, heat is not being efficiently dissipated from and evaluate the feasibility of fluid agitation in improving heat transfer of the oil. The objective

  10. ME Senior Practicum Projects Overview -2008-09/10

    E-Print Network [OSTI]

    Connors, Daniel A.

    -stroke internal combustion engine The accumulator system is made up of NiMh battery modules donated by DenverGrid Photovoltaic Simulator (7) D. Zimmerle · John Deere Straight Vegetable Oil D. Olsen Engine Development (8) #12Sat Fiberoptic Mass Gauging A. Yalin System (9) · SAE Aero Competition (10) H. Sakurai · Neonatal Transport

  11. Written Statement of David Huizenga Senior Advisor for Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    the FY 2014 Request. Written Statement of David Huizenga Senior Advisor for Environmental Management United States Department of Energy Before the Subcommittee on Strategic Forces...

  12. 1997 Atmospheric Chemistry Colloquium for Emerging Senior Scientists

    SciTech Connect (OSTI)

    Paul H. Wine

    1998-11-23

    DOE's Atmospheric Chemistry Program is providing partial funding for the Atmospheric Chemistry Colloquium for Emerging Senior Scientists (ACCESS) and FY 1997 Gordon Research Conference in Atmospheric Chemistry

  13. Senior Advisor David Huizenga's Written Statement Before the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Water Development Committee on Appropriations (March 19, 2013) Written Statement of David Huizenga, Senior Advisor for Environmental Management, United States Department of...

  14. Richard Gerber! NERSC Senior Science Advisor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior Science Advisor

  15. Richard Gerber! NERSC Senior Science Advisor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior Science AdvisorNERSC 2014

  16. for Senior Signature (minimum gift to Senior Signature required to be included on Class of 2015 Plaque) Additional gift for School/College/Program

    E-Print Network [OSTI]

    Arnold, Jonathan

    for Senior Signature (minimum gift to Senior Signature required to be included on Class of 2015 is required to be included on the Class of 2015 plaque) I am proud to support the Georgia Fund SENIOR myID Email Name as it should appear on Senior Signature Class Plaque (maximum 25 spaces) VISA

  17. Writing Sociology A Guide for Junior Papers and Senior Theses

    E-Print Network [OSTI]

    Bou-Zeid, Elie

    , legal proceedings, or organizational records. Whether using quantitative or qualitative methods the university's independent research requirements for sociology: a junior paper for juniors, and a senior thesis our social worlds. Independent research, whether or JP or senior thesis, must treat seriously

  18. 10:30AM TODAY: Senior Administration Officials to Hold a Background...

    Energy Savers [EERE]

    TODAY: Senior Administration Officials to Hold a Background Conference Call Regarding Oil 10:30AM TODAY: Senior Administration Officials to Hold a Background Conference Call...

  19. Contact:Duane Dailey Senior Writer

    E-Print Network [OSTI]

    Noble, James S.

    projects an average wheat price of $5.10 per bushel for the current market year. Total wheat use, including prices are projected to average $3.68 per bushel for the crop harvested this fall. USDA estimates record yields this year, which moderates price increases for corn, Gerlt said FAPRI projects a soybean price

  20. Contact:Duane Dailey Senior Writer

    E-Print Network [OSTI]

    Noble, James S.

    MU economic baseline projects production and prices for the coming decade. "When we look at 2013 in price projections. For their analysis, MU economists assume normal weather ahead. "Producers see record unknown in the projections. "The U.S. needs economic growth to sustain record prices," Brown said. "Meat

  1. MATH 480O SENIOR SEMINAR UNIVERSITY OF HAWAII AT MANOA

    E-Print Network [OSTI]

    Faber, Xander

    MATH 480O ­ SENIOR SEMINAR UNIVERSITY OF HAWAII AT MANOA SPRING 2013 Professor Info: Dr. Xander Faber 404 Physical Sciences Building xander@math.hawaii.edu www.math.hawaii.edu/xander/ Office Hours

  2. Leading by Example: Argonne Senior Management Makes "Green" Vehicle Choices

    ScienceCinema (OSTI)

    Peters, Mark; Kearns, Paul;

    2013-04-19

    Argonne's senior management shows leadership in the sustainability arena with their own personal choices in "green" vehicles. They don't just talk the talk ? they walk the walk.

  3. Leading by Example: Argonne Senior Management Makes "Green" Vehicle Choices

    SciTech Connect (OSTI)

    Peters, Mark; Kearns, Paul

    2011-01-01

    Argonne's senior management shows leadership in the sustainability arena with their own personal choices in "green" vehicles. They don't just talk the talk — they walk the walk.

  4. Generalization Improvement in Multi-Objective Learning Lars Graning, Yaochu Jin, Senior Member, IEEE, and Bernhard Sendhoff, Senior Member, IEEE

    E-Print Network [OSTI]

    Jin, Yaochu

    Generalization Improvement in Multi-Objective Learning Lars Gr¨aning, Yaochu Jin, Senior Member to be learned. The main challenge here is the learning of a new task may cause Lars Gr¨aning, Yaochu Jin

  5. Honors and the Senior Thesis in Hispanic Studies Seniors wishing to graduate with a Hispanic Studies major must enroll in HISP 198a

    E-Print Network [OSTI]

    Snider, Barry B.

    Honors and the Senior Thesis in Hispanic Studies Seniors wishing to graduate with a Hispanic in the Spring to complete the Senior Thesis. Departmental Honors are awarded on the basis of cumulative excellence in all courses taken for the major, but with primary emphasis on the excellence of the Thesis

  6. Oceanography Senior Thesis Guidebook For Fall-Winter-Spring 2012-2013

    E-Print Network [OSTI]

    Riser, Stephen C.

    Oceanography Senior Thesis Guidebook For Fall-Winter-Spring 2012-2013 University of Washington School of Oceanography Box 357940 Seattle WA 98195 http://courses.washington.edu/ocean443 http............................................................................................................................ 2 Criteria defining the Oceanography Senior Thesis Experience

  7. Los Angeles CleanTech Incubator to Host Event With Senior Energy...

    Office of Environmental Management (EM)

    Angeles CleanTech Incubator to Host Event With Senior Energy Department Official Dr. Arun Majumdar Los Angeles CleanTech Incubator to Host Event With Senior Energy Department...

  8. Los Angeles CleanTech Incubator to Host Event With Senior Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Los Angeles CleanTech Incubator to Host Event With Senior Energy Department Official Dr. Arun Majumdar Los Angeles CleanTech Incubator to Host Event With Senior Energy Department...

  9. Opportunities Senior Research Specialist Poul Erik Morthorst

    E-Print Network [OSTI]

    emissions - CO2, NOx, SO2 Noise Visual impacts · ExternE Large EU-project All the way from the impact that is not Included in the Price of Energy Today #12;Production Costs plus Externalities 0 2 4 6 8 10 12 14 Coal Union Australia Latin America Rest of Asia World Electricity Demand 2020 27,000 TWh 1998 14,000 TWh #12

  10. VACUUM ENERGY IN QUANTUM GRAPHS A Senior Honors Thesis

    E-Print Network [OSTI]

    VACUUM ENERGY IN QUANTUM GRAPHS A Senior Honors Thesis by JUSTIN HOWARD WILSON Submitted ABSTRACT Vacuum Energy in Quantum Graphs. (April 2007) Justin Howard Wilson Department of Physics the vacuum energy in quantum graphs. Vacuum energy arose in quantum physics but has an independent

  11. Furlough or Reduction in Force in the Senior Executive Service

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-05-15

    To establish requirements and assign responsibilities for furlough and reduction in force (RIF) of the Senior Executive Service (SES) in the Department of Energy (DOE) and the National Nuclear Security Administration (NNSA). Supersedes O DOE 3350.1 Chg 1 and DOE 3351.2 Chg 1.

  12. Iraq's Oil Tomorrow Valerie Marcel, Senior Research Fellow

    E-Print Network [OSTI]

    O'Donnell, Tom

    Iraq's Oil Tomorrow April 2003 By Valerie Marcel, Senior Research Fellow John V. Mitchell the prior permission of the copyright holder. #12;Iraq's Oil Tomorrow 2 Introduction Public perceptions that the American-led military campaign against Iraq is fuelled by oil are widespread in Europe and in the Middle

  13. Charly Lockwood, MD, MHCM Dean, Senior Vice President

    E-Print Network [OSTI]

    Meyers, Steven D.

    Specialist Angela Johnson Administrative Support, Payroll Health International Foundation Vice President Kim Gregory Vanette HPCC, CFO Lynn Bolt- Hansen, MSW SPTRS Senior Faculty Administrator Kymia Jackson, MBA Price Director, Internal Audit Alex Neff Decision Support Analyst Gretchen Koehler, PhD Assistant Vice

  14. The Silver Tsunami Proposal Providing the Seniors of Carroll County

    E-Print Network [OSTI]

    Frantz, Kyle J.

    The Silver Tsunami Proposal Providing the Seniors of Carroll County with Personal Transportation for aging generations #12;Comparing Options The Silver Tsunami Proposal is: Cheaper than taxis More prevent the same collaboration. Silver Tsunami is acting as a mediating entity between various

  15. The following have been specially designated under this section: the Secretary of the Press Syndicate, Directors, Associate Directors, Senior Editors, and Senior Managers of the Press.

    E-Print Network [OSTI]

    Lasenby, Joan

    1 The following have been specially designated under this section: the Secretary of the Press Syndicate, Directors, Associate Directors, Senior Editors, and Senior Managers of the Press. Statute J THE UNIVERSITY PRESS 1. There shall be in the University a University Press which shall be devoted to printing

  16. Outstanding Chemical and Nuclear Engineer Awards At each June Commencement, the senior class announces their selections for three department awards: outstanding senior, teaching

    E-Print Network [OSTI]

    Outstanding Chemical and Nuclear Engineer Awards At each June Commencement, the senior class member. They are shown below. The two degree programs, chemical engineering and nuclear engineering, had. Year Program Senior Teaching Assistant Professor 2006 Chemical Kathleen Harvey Derek Wayne Griffin

  17. Senior Real Property Officer (SRPO) Responsibilities About Senior Real Property Officers (SRPO)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool FitsProjectDataSecretary Moniz's OpenEnergySeizingDepartmentthe

  18. Richard Gerber! NERSC Senior Science Advisor! NERSC Training Lead

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior Science AdvisorNERSCNERSC

  19. Richard Gerber! NERSC Senior Science Advisor! User Services Group Lead

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior ScienceUser Services Group

  20. Solar heating and hot water system installed at the Senior Citizen Center, Huntsville, Alabama. [Includes engineering drawings

    SciTech Connect (OSTI)

    Not Available

    1980-02-01

    Information is provided on the solar energy system installed at the Huntsville Senior Citizen Center. The solar space heating and hot water facility and the project involved in its construction are described in considerable detail and detailed drawings of the complete system and discussions of the planning, the hardware, recommendations, and other pertinent information are included. The facility was designed to provide 85 percent of the hot water and 85 percent of the space heating requirements. Two important factors concerning this project for commercial demonstration are the successful use of silicon oil as a heat transfer fluid and the architecturally aesthetic impact of a large solar energy system as a visual centerpoint. There is no overheat or freeze protection due to the characteristics of the silicon oil and the design of the system. Construction proceeded on schedule with no cost overruns. It is designed to be relatively free of scheduled maintenance, and has experienced practically no problems.

  1. NNSA Procurement Perspective - Joe Waddell, NNSA Senior Procurement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procurement Projects Perspective - Bob Raines, Associate Administrator for Acquisition and Project Management, NNSA Aligning Contract Incentives Subject: Cost and Price Analysis...

  2. Senior Software Engineer -High Performance NerVve Technologies Buffalo, NY

    E-Print Network [OSTI]

    Salvaggio, Carl

    Senior Software Engineer - High Performance NerVve Technologies ­ Buffalo, NY Senior Software Engineer - High Performance NerVve Technologies, a fast growing visual search company, is seeking a highly guide team members towards writing high performance server side software. You must be a highly self

  3. SENIOR SCHOLARS ANNUAL A Compendium of Publications, Honours, Awards, Invited Lectures, Teaching

    E-Print Network [OSTI]

    Sokolowski, Marla

    SENIOR SCHOLARS ANNUAL 2012 #12;SENIOR SCHOLARS ANNUAL 2012 A Compendium of Publications, Honours and RALUT, University of Toronto Formerly entitled RALUT Publications and Honours This compilation presents a sample of the ongoing scholarly activities of retired faculty and librarians at the University of Toronto

  4. AC 2010-343: NASA SENIOR DESIGN: MISSION ASSURANCE MANAGEMENT ENVIRONMENT

    E-Print Network [OSTI]

    Conrad, James M.

    AC 2010-343: NASA SENIOR DESIGN: MISSION ASSURANCE MANAGEMENT ENVIRONMENT Jiang Guo, California University Los Angeles © American Society for Engineering Education, 2010 #12;NASA Senior Design: Mission Assurance Management Environment Abstract This paper discusses the implementation experience of our NASA

  5. Senior Quality Assurance specialist IGSoft Ltd. is an European Software company with a wide range of

    E-Print Network [OSTI]

    Kasparian, Azniv

    Senior Quality Assurance specialist Who are we IGSoft Ltd. is an European Software company and maintaining one of the leading and easy to use, online poker software in the world. Thousands players trust us and bright minded people. For the future growth of the company we are looking for A Senior Quality Assurance

  6. First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall1

    E-Print Network [OSTI]

    Auerbach, Scott M.

    First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year For your Freshman and Sophomore years, students should follow the appropriate flow chart based on your year Experience (IE) course is a senior year requirement for all students who entered

  7. Job opening: Senior Software Engineer (Cambridge, MA) CellProfiler opensource software

    E-Print Network [OSTI]

    Carpenter, Anne E.

    Job opening: Senior Software Engineer (Cambridge, MA) CellProfiler opensource software Cell Platform) at the Broad Institute of Harvard and MIT has an opening for a highly motivated senior software functions from microscopy images. We seek a software engineer with a strong record of accomplishment

  8. Faculty Adviser Contract Government Senior Honors Thesis This form is intended to inform the Undergraduate Program Office of a faculty member's commitment to advise a senior thesis. A signed

    E-Print Network [OSTI]

    Wolfe, Patrick J.

    Faculty Adviser Contract ­ Government Senior Honors Thesis 2014-2015 This form is intended to inform the Undergraduate Program Office of a faculty member's commitment to advise a senior thesis. A signed contract must be submitted in order to enroll in Government 99: Senior Thesis Writers' Workshop

  9. TF Adviser Contract Government Senior Honors Thesis This form is intended to inform the Undergraduate Program Office of a faculty member's commitment to advise a senior thesis. A signed

    E-Print Network [OSTI]

    Wolfe, Patrick J.

    TF Adviser Contract ­ Government Senior Honors Thesis 2014-2015 This form is intended to inform the Undergraduate Program Office of a faculty member's commitment to advise a senior thesis. A signed contract must be submitted in order to enroll in Government 99: Senior Thesis Writers' Workshop, which is a mandatory course

  10. Monday, February 23, 2004 Decision on site for fusion project is put off again

    E-Print Network [OSTI]

    Monday, February 23, 2004 Decision on site for fusion project is put off again VIENNA (Kyodo) The six parties involved in an international nuclear fusion project have again failed to decide on either in March. Senior officials of the parties to the International Thermonuclear Experimental Reactor project

  11. LEARNING IMPROVED LINEAR TRANSFORMS FOR SPEECH RECOGNITION Andrew Senior

    E-Print Network [OSTI]

    Senior, Andrew

    investigate a new way of constructing a dimensionality-reducing linear projection to improve the modelling have been proposed, linear discriminant analysis (LDA) is still widely used to project speech features- reducing linear projection that maximizes a class separation criterion by solving a generalised eigen

  12. Perceptions of selected senior administrators of higher education institutions in Mexico regarding needed administrative competencies 

    E-Print Network [OSTI]

    Gonzalez y Gonzalez, Elsa Maria

    2005-02-17

    Higher education institutions have an important role in changing societies; those in developing countries present an ample spectrum of differences, particularities, and needs. The role that senior administrators play as ...

  13. Written Statement of David Huizenga Senior Advisor for Environmental...

    Office of Environmental Management (EM)

    known as the Sodium Bearing Waste project) will treat 900,000 gallons of radioactive liquid waste stored in underground tanks at the Idaho National Laboratory. Following the...

  14. The Idaho National Laboratory (INL) Senior Seismic Hazard Analysis...

    Office of Environmental Management (EM)

    SSHAC Level 1 PSHA at MFC More Documents & Publications The INL Seismic Risk Assessment Project: Requirements for Addressing DOE Order 420.1C & A Proposed Generic...

  15. ENG EC464 Senior Design Project II 2008-2009 Catalog Data

    E-Print Network [OSTI]

    ; Vehicle Anti-theft Device ; UQC; Underwater Phone; HUD Night Vision ; DSP Guitar Contribution of Course

  16. CIS400/401 Project Proposal Specification Dept. of CIS -Senior Design 2009-2010

    E-Print Network [OSTI]

    Plotkin, Joshua B.

    -line citations to your bibli- ography (really all sections should have citations, but we expect them to be most

  17. Bourns College of Engineering, University of California, Riverside EE-175: Senior Design Project

    E-Print Network [OSTI]

    application areas include data acquisition, active control of an innovative windmill, robot sumo (robots

  18. I Mr. Sam Popowcer, PE Senior Project Manager BCM Engineers, Inc.

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and MyersHr. Anthony V. Andolina: lHeader5s I

  19. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2001 Project Team Faculty: Grace Brush, Geography & Environmental Engineering, Whiting School of Engineering Fellow: Dan Bain, Geography & Environmental Engineering, Whiting School. Through this project, the team proposes to develop a variety of resources: a set of general, web

  20. Professional Mentorship Program Application The program offers College of Media juniors, seniors and graduate students the opportunity to be

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    Professional Mentorship Program Application The program offers College of Media juniors, seniors, public relations, broadcasting, print and multimedia journalism. Professionals can offer resume advice

  1. Senior Design Projects 2013 Project Title 1 : Monte Carlo Simulations Using a Benchmark Full-Core Pressured Water Rector Model

    E-Print Network [OSTI]

    Danon, Yaron

    -Core Pressured Water Rector Model Advisor: Prof. X. George Xu (JEC 5003; Tel: 518-276-4014; Email: xug2@rpi in the design and analysis of nuclear reactor systems. One of the most desirable modeling and simulation a full-core PWR reactor model for parallel MCNP calculations on the CCNI system 4. Code optimization

  2. Spring 2014 Junior-Senior Engineering Clinic Projects ME Project Proj. Manager ME ECE ChE CEE

    E-Print Network [OSTI]

    Bouaynaya, Nidhal

    0 2 0 0 23 Bactericidal Coatings for Orthopedic Implants Krchnavek 1 2 1 0 24 Tesla Art Exhibit: Assist area artist by developing kinetic framework for large-scale art exhibit on Nikolai Tesla for Near Infrared Sensor to enhance battery lifeIzzetoglu 0 2 0 0 32 Plasma stops bleeding and closes

  3. Experience Curves and Solar PV Fred Heutte, Senior Policy Associate

    E-Print Network [OSTI]

    resources costs as being ranges rather than fixed values. It is evident that the question of future solar PV for transmission expansion. Consequently, the future estimated cost projection for solar PV has been a point for solar PV should be dramatically changed "downward" going forward (i.e., significantly less of a cost

  4. State Monitoring in Cloud Datacenters Shicong Meng, Student Member, IEEE, Ling Liu, Senior Member, IEEE, and

    E-Print Network [OSTI]

    Liu, Ling

    State Monitoring in Cloud Datacenters Shicong Meng, Student Member, IEEE, Ling Liu, Senior Member application is a critical functionality for cloud datacenter management. State monitoring requires meeting two. Index Terms--State monitoring, datacenter, cloud, distributed, aggregation, tuning. Ç 1 INTRODUCTION

  5. Introduction to Industrial Control Networks Brendan Galloway and Gerhard P. Hancke, Senior Member, IEEE

    E-Print Network [OSTI]

    Hancke, Gerhard

    1 Introduction to Industrial Control Networks Brendan Galloway and Gerhard P. Hancke, Senior Member, IEEE Abstract--An industrial control network is a system of in- terconnected equipment used to monitor and control physical equipment in industrial environments. These networks differ quite significantly from

  6. Architectural-Level Risk Analysis Using UML Katerina Goseva-Popstojanova, Senior Member, IEEE,

    E-Print Network [OSTI]

    Goseva-Popstojanova, Katerina

    Architectural-Level Risk Analysis Using UML Katerina Goseva-Popstojanova, Senior Member, IEEE process and the quality of software products, we need to be able to build risk analysis models based architecture, a dynamic heuristic risk factor is obtained and severity is assessed based on hazard analysis

  7. Quasi-Output-Buffered Switches Cheng-Shang Chang, Fellow, IEEE, Jay Cheng, Senior Member, IEEE,

    E-Print Network [OSTI]

    Chang, Cheng-Shang

    1 Quasi-Output-Buffered Switches Cheng-Shang Chang, Fellow, IEEE, Jay Cheng, Senior Member, IEEE-buffered switches have better performance than other switch architectures. However, output-buffered switches also-buffered switches are difficult. In this paper, we study the problem of constructing scalable switches that have

  8. C Compiler Targeting the Java Virtual Machine Senior Honors Thesis (Advisor: Javed A. Aslam)

    E-Print Network [OSTI]

    C Compiler Targeting the Java Virtual Machine Jack Pien Senior Honors Thesis (Advisor: Javed A to compile once and execute across many different platforms. With the emergence of the Internet by Sun Microsystems to address this "Write Once, Run Anywhere" problem. What sets a compiled Java program

  9. Eric S. Schubert is a Senior Market Economist at the Wholesale Market Oversight of the Public

    E-Print Network [OSTI]

    Oren, Shmuel S.

    Utility Commission of Texas in Austin with expertise on wholesale market design and resource adequacy played a key role in design of electricity market in ERCOT. In addition to monitoring market activitiesEric S. Schubert is a Senior Market Economist at the Wholesale Market Oversight of the Public

  10. Cost-Sensitive Boosting Hamed Masnadi-Shirazi and Nuno Vasconcelos, Senior Member, IEEE

    E-Print Network [OSTI]

    Vasconcelos, Nuno M.

    Cost-Sensitive Boosting Hamed Masnadi-Shirazi and Nuno Vasconcelos, Senior Member, IEEE Abstract--A novel framework is proposed for the design of cost-sensitive boosting algorithms. The framework is based on the identification of two necessary conditions for optimal cost-sensitive learning that 1) expected losses must

  11. First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall Spring Fall

    E-Print Network [OSTI]

    Mountziaris, T. J.

    First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall1 Spring1 Fall Spring Fall For your Freshman and Sophomore years, students should follow the appropriate flow chart based on your year of graduation. C O O P 63 Credits 16 Credits 16

  12. First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall Spring Fall

    E-Print Network [OSTI]

    Mountziaris, T. J.

    First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall1 Spring1 Fall Spring Fall For your Freshman and Sophomore years, students should follow the appropriate flow chart based on your year of graduation. C O O P 63 Credits 16

  13. First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall Spring Fall

    E-Print Network [OSTI]

    Mountziaris, T. J.

    First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall1 Spring1 Fall Spring Fall For your Freshman and Sophomore years, students should follow the appropriate flow chart based on your year of graduation. C O O P 66 Credits

  14. First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall Spring Fall

    E-Print Network [OSTI]

    Mountziaris, T. J.

    First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall1 Spring1 Fall Spring Fall For your Freshman and Sophomore years, students should follow the appropriate flow chart based on your year of gaduation. C O O P 66 Credits 16 Credits 13

  15. The role of seniority-zero states in nuclear level densities

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Åberg, S.; Carlsson, B. G.; Døssing, Th.; Möller, P.

    2015-06-01

    At low excitation energies seniority-zero states dominate the level density of K=0 bands in deformed even–even nuclei, while they play no role at higher excitation energies. We describe the level densities in a Fermi-gas model as well as in a combinatorial level-density model and compare to detailed experimental data for some rare-earth nuclei.

  16. Senior Managers' Implementation Guide for Use with DOE O 450.1, Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-10-25

    This Guide provides a summary description of environmental management systems (EMSs) for DOE senior managers, including their responsibilities as they apply to the successful implementation of an Integrated Safety Management Systems/EMS and the expected benefits to be derived from such implementation. Canceled by DOE N 251.82.

  17. Tarn Yates, Senior Thesis, Physics Department UCSC Summer 2003 Solar Cells in Concentrating Systems

    E-Print Network [OSTI]

    Drop in Crystalline Silicon Solar Cells. 20 iii. Temperature Dependence of the Spectral and Efficiency. This is because the cost of solar panels compared to the amount of power they produce makes their purchaseTarn Yates, Senior Thesis, Physics Department UCSC Summer 2003 Solar Cells in Concentrating Systems

  18. Supervisory Control of Software Systems Vir V. Phoha, Senior Member, IEEE, Amit U. Nadgar,

    E-Print Network [OSTI]

    Ray, Asok

    Supervisory Control of Software Systems Vir V. Phoha, Senior Member, IEEE, Amit U. Nadgar, Asok Ray software systems based on the Supervisory Control Theory (SCT). Our method uses the SCT to model the execution of a software application by restricting the actions of the OS with little or no modifications

  19. Capstone Senior Design 2012-13 EcoCAR2: Mechanical (1) Thomas Bradley

    E-Print Network [OSTI]

    Connors, Daniel A.

    Capstone Senior Design 2012-13 #12;·EcoCAR2: Mechanical (1) Thomas Bradley ·EcoCAR2: User Interface Vehicle Challenge (7) Steven Schaeffer ·AFRL: Bridge Design Challenge (8) Tammy Donahue #12;·Wheelchair (17) Mitchell Stansloski ·Pioneer Engin.: Machinery Health Monitoring Inst.(18) Mitchell Stansloski

  20. Nancy Lewis Sponsored Projects

    E-Print Network [OSTI]

    Wood, Marcelo A.

    Subcontract Officer (.75 FTE) Heather Pittman Senior Contract & Grant Officer Grace Park Principal Subcontract Industry Clinical Trials TBN Principal Contract Officer Industry Clinical Trials #12;

  1. 10 Questions for a Senior Scientist: Michael Wang | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing ToolInternationalReport FY2014 -EnergyEnergySenior Scientist: Michael Wang 10

  2. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    & Sciences Project Title Visualize Physical Principles with Virtual Lab Modules Audience Undergraduate provide easy access to digital information, but don't provide experience with right- hand screws, electric of the last generation of physics students. The result is that today's students don't have an intuitive

  3. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    . Pedagogical Issue One of the challenges in teaching the Introduction to Computer Music course is the lack flow and practices. These resources will provide an online space through which students will be able piece of this project will be an animated studio walkthrough requiring user interaction and providing

  4. Richard Gerber! NERSC Senior Science Advisor! Acting User Services Group Lead

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior Science AdvisorNERSC

  5. Richard Gerber! NERSC Senior Science Advisor! NERSC User Services Deputy Group Lead

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior Science

  6. Senior Cheerleaders

    E-Print Network [OSTI]

    Hacker, Randi

    2010-06-09

    Broadcast Transcript: Japan's Bubble Economy is so last century. These days the atmosphere is what you might call gloomy what with a growing budget deficit, a graying population and a grave job market. So what can a concerned ...

  7. Senior Staff

    ScienceCinema (OSTI)

    None

    2011-04-25

    Discussion entre la direction du Cern et les chefs de divisions et groupes(reorganization of research section)

  8. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  9. AC 2009-1630: ASSESSING SENIOR DESIGN PROJECT DELIVERABLES James Conrad, University of North Carolina at Charlotte

    E-Print Network [OSTI]

    Conrad, James M.

    Carolina State University. He is currently an associate professor at the University of North Carolina at North Carolina State University. He has also worked at IBM in Research Triangle Park, North Carolina, and Houston, Texas; at Ericsson/Sony Ericsson in Research Triangle Park, North Carolina; and at BPM Technology

  10. Texas Tech University Military & Veterans Programs My name is Josh Quigley. I'm originally from Lubbock, Texas and I'm a senior Wildlife

    E-Print Network [OSTI]

    Rock, Chris

    Texas Tech University Military & Veterans Programs My name is Josh Quigley. I'm originally from Lubbock, Texas and I'm a senior Wildlife Management major here at Texas Tech. My name is Todd Truesdell. I am classified as a senior and I'm from Carrollton, Texas. My name is Alex Robles. I'm a junior here

  11. Standards-enabled Smart Grid for the Future Valeriy Vyatkin, Senior Member, IEEE, Gulnara Zhabelova, non-member,

    E-Print Network [OSTI]

    Ulieru, Mihaela

    . They will obtain direct financial benefits while promoting at the same time the growth of renewable energy sourcesWeb vision [2]. Since energy consumption by users and energy production by renewable energy sources1 Standards-enabled Smart Grid for the Future EnergyWeb Valeriy Vyatkin, Senior Member, IEEE

  12. Model-Based Performance Risk Analysis Vittorio Cortellessa, Katerina Goseva-Popstojanova, Senior Member, IEEE, Kalaivani Appukkutty,

    E-Print Network [OSTI]

    Goseva-Popstojanova, Katerina

    Model-Based Performance Risk Analysis Vittorio Cortellessa, Katerina Goseva-Popstojanova, Senior such type of risk analysis. Finally, we introduce a methodology to obtain, from annotated Sequence Diagrams introduces the basic concepts of risk analysis along with an overview of the related work. In Section 3, we

  13. Database-Assisted Low-Dose CT Image Restoration Wei Xu, Sungsoo Ha and Klaus Mueller, Senior Member, IEEE

    E-Print Network [OSTI]

    Database-Assisted Low-Dose CT Image Restoration Wei Xu, Sungsoo Ha and Klaus Mueller, Senior Member, IEEE Abstract­ The image quality of low-dose CT scans typically suffers greatly from the limited utilization of X-ray radiation. Although the harmful effects to patient health are reduced, the low quality

  14. Hybrid Impedance Control of a 3-DOF Robotic Arm Used for Rehabilitation Jingguo Wang and Yangmin Li*, Senior Member, IEEE

    E-Print Network [OSTI]

    Li, Yangmin

    Hybrid Impedance Control of a 3-DOF Robotic Arm Used for Rehabilitation Treatment Jingguo Wang and Yangmin Li*, Senior Member, IEEE Abstract-- A 3-DOF planar robotic arm is designed and used-limb function. In order to strengthen the patient's arm, some forces are desired to be followed while

  15. Hartmut Durchschlag, Cargill Hartmut Durchschlag recently joined Cargill as a Senior Commodity Quantitative Analyst. Prior to that, Mr. Durchschlag

    E-Print Network [OSTI]

    Ciocan-Fontanine, Ionut

    Manage- ment and Modeling at ABN AMRO and a Senior Derivatives Specialist at Santander Investment Bank on trading, hedging and risk management strategies and programs for oil and gas companies. Nelson has also officer for UBS Investment Bank. He began his career in the quantitative research group at Enron

  16. Aircraft Hangar High Expansion Foam Project

    Broader source: Energy.gov [DOE]

    Presenter: Lenny Farello, Senior Fire Protection Engineer, NNSA Associate Administrator for Safety, Infrastructure and Operations (NA?50)

  17. project management

    National Nuclear Security Administration (NNSA)

    3%2A en Project Management and Systems Support http:www.nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  18. Project Complete

    Broader source: Energy.gov [DOE]

    DOE has published its Record of Decision announcing and explaining DOE’s chosen project alternative and describing any commitments for mitigating potential environmental impacts. The NEPA process...

  19. Project Construction

    Broader source: Energy.gov [DOE]

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  20. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    projects that involve UCSD faculty members and graduate students from the structural engineering (SE), mechanical and aerospace engineering (MAE), electrical and computer...

  1. Energy Reduction Projects to Help Nissan Reach BBBP Goals 

    E-Print Network [OSTI]

    Rasmussen, B.

    2013-01-01

    Projects to Help Nissan Reach BBBP Goals Brett Rasmussen, PE, CEM Senior Energy Engineer Nissan North America May 23, 2013 ESL-IE-13-05-38 Proceedings of the Thrity-Fifth Industrial Energy Technology Conference New Orleans, LA. May 21-24, 2013... ? ? ? Smyrna, TN Decherd, TN Canton, MS NISSAN?S U.S. PLANTS 2 ESL-IE-13-05-38 Proceedings of the Thrity-Fifth Industrial Energy Technology Conference New Orleans, LA. May 21-24, 2013 Bill Kruger Signs the Save Energy Now Leader Pledge Dec 2nd 2009 ESL...

  2. RESEARCH PROJECTS February 13

    E-Print Network [OSTI]

    Schenato, Luca

    RESEARCH PROJECTS FP7 February 13 #12; FP7 COOPERATION #12; INTERNATIONAL RESEARCH PROJECTS FP7 COOPERATION ENERGY PROJECT ACRONYM: EFONET PROJECT TITLE: Energy foresight network PROJECT

  3. Creative financing of landfill gas utilization projects

    SciTech Connect (OSTI)

    Peters, J.P. Jr.; Laughlin, M.F.; McGuigan, M.J.

    1996-11-01

    The landfill gas utilization industry has gone through profound change in the last ten years and is in for further changes in the coming years. The first change is the probable expiration of Section 29 tax credits for newly developed projects and the second is the upcoming NSPS mandate to capture fugitive LFG emission from our nations larger landfills. In order to provide for the capital needs of LFG utilization project developers, lenders and investors must adapt to the changing nature of the industry as well. Lyon Credit Corporation has provided senior and subordinated financing as well as lease financing for the LFG utilization industry for the last three years. During this time, LCC has had to adapt its product offerings to meet the continuing needs of the borrowers in this industry. This presentation will focus on the changing nature of the industry and its effect on the economics, capital and financing requirements of newly developed LFG utilization projects. The two fundamental changes which have drastically altered the way projects are structured and financed include the changing nature of the LFG project product end-user and various regulatory and legislative measures which have significantly impacted the responsibilities of the project owner/developer and the future profitability of all LFG utilization projects. The successful LFG utilization project developers will be those who recognize that these changes are permanent departures from past practices, and those who will seek to exploit opportunities created by these changes. The lenders and investors to this industry will likewise have to adapt with these changes in order to continue to provide needed capital to this growing industry.

  4. Perceptions of Caring and Nursing by Senior Level Baccalaureate Nursing Students from Thailand and the United States as Influenced by Curriculum Focus: A Descriptive, Comparative Study

    E-Print Network [OSTI]

    Stopper, Mary Constance

    2012-12-31

    curriculum. Students from three schools in the Southeast or Midwest United States, and Thailand participated in the study. Senior level and entry level students provided their perceptions of caring using the Caring Factor Survey - Care Provider Version (CFS...

  5. PROJECT MANGEMENT PLAN EXAMPLES

    Broader source: Energy.gov (indexed) [DOE]

    accelerates the project schedule and significantly reduces the project total life cycle cost. Current Baseline (FY99 MYWP) Revised Project Baseline Project Scope: ...

  6. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    2008-01-15

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  7. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  8. Project Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions |(Conference) | SciTechProjectITER Project

  9. Project Tour

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions |(Conference)Project Tour Project Tour See NMSSUP from

  10. Todd A. Diacon Senior Vice President for Academic Affairs and Provost Emily Myers

    E-Print Network [OSTI]

    Palffy-Muhoray, Peter

    , Communication and Information Sonia Alemagno Dean, Public Health Dan Mahony Dean, Education, Health, Human Interim Dean, Honors College James Bracken Dean, University Libraries Sally Kandel Assoc. Vice President. Gabrovsek Technology Project Dir. Regional Campuses Trustees Professors Special Functions Marcia Kibler

  11. Spent Nuclear Fuel project, project management plan

    SciTech Connect (OSTI)

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  12. Lemon Project Spring Symposium

    E-Print Network [OSTI]

    Fashing, Norman

    Lemon Project: A Journey of Reconciliation." The BOV defined Lemon "as a long- term research project

  13. Connecticut Weatherization Project Improves Lives, Receives National...

    Broader source: Energy.gov (indexed) [DOE]

    Several energy-efficient improvements made to a senior care center in New Milford, Connecticut, are helping residents live healthier and more comfortable lifestyles. The upgrade...

  14. Hydropower Projects

    SciTech Connect (OSTI)

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

  15. PROJECT SUMMARY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy Bills andOrder 422.1, CONDUCT P - . . -Pathways)PROJECT SUMMARY 1 TITLE

  16. Hallmark Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12,ExecutiveFinancing Programs |ReferencePowerHaier: OrderProject

  17. PAUL H. GOLDSWORTHY INSTRUCTOR/SENIOR SUPPLY CHAIN EXECUTIVE AND CONSULTANT

    E-Print Network [OSTI]

    Lin, Xiaodong

    in Purchasing Strategies and Negotiations / Project Management / Cost Reduction / Outsourcing Results driven at the Undergraduate and MBA level. Lead initiatives to grow the new UG SCMMS major, which has resulted in over 25 ­ 2010) · Lead initiatives to add value and reduce costs for all direct and indirect sourcing in North

  18. Learning and Design of Principal Curves Balazs Kegl, Student Member, IEEE, Adam Krzyzak, Senior Member, IEEE,

    E-Print Network [OSTI]

    Zeger, Kenneth

    curve learning from training data and it also leads to a new practical construction. Our theoretical of the vertices are updated so that they minimize a penalized squared distance criterion. Simulation results one-dimensional approxi- mation to the distribution of and the projection of to this line gives

  19. Custom Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit theCovalent Bonding in ActinideRailCurrent ResearchInnovationCustom-Projects

  20. Project Title

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy Bills andOrderNATIONALofDefineEnergy NationalDepartmentProjectNE I&C

  1. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions |(Conference) | SciTechProject Gnome Double Beta Decay

  2. Project Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions |(Conference) | SciTechProjectITERFebruaryStorage

  3. About Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory of raregovAboutRecovery Act Recovery ActARM OverviewAbout GEDOE Projects

  4. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousand CubicResourcelogo and-E C H2015Tray and|Projects Pages default

  5. PROJECT MANGEMENT PLAN EXAMPLES Project Organization Examples

    Energy Savers [EERE]

    is responsible for supporting the FDH and RL project offices with adequate day-to-day planning and review technical management, coordination, control, and reporting of project...

  6. Federal Grant Fully Funds Small Turbine Installation at Maine Senior Housing Complex

    SciTech Connect (OSTI)

    Not Available

    2008-01-01

    In March 2007, local agencies in Maine launched an effort to reduce energy costs for residents of a subsidized elderly housing complex in Winter Harbor, resulting in a federal Residential Energy Assistance Challenge (REACH) grant that entirely funded the installation of a 10-kW Bergey Excel turbine. This fact sheet describes the project, including difficulties encountered during the permitting process and a summary of the costs covered by the REACH grant.

  7. PROJECT MANAGEMENT Professional Organizations

    E-Print Network [OSTI]

    Acton, Scott

    PROJECT MANAGEMENT Professional Organizations: Association of Collegiate Computing Services) Project Management Institute (PMI) Events & Training: UVA Local Support Partners (LSP) program training Project Management Institute webinars Project Management Institute events Scrum Alliance events Learning

  8. Project Management Lessons Learned

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-05

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

  9. PROJECT MANAGEMENT Professional Organizations

    E-Print Network [OSTI]

    Acton, Scott

    PROJECT MANAGEMENT Professional Organizations: Project Management Institute International Association of Project and Program Management (IAPPM) Events & Training: UVa Center for Leadership Excellence classes SkillSoft classes PMO Symposium through PMI Project Management Institute (PMI) webinars American

  10. On the Capacity of k-MPR Wireless Networks Ming-Fei Guo, Member, IEEE, Xinbing Wang, Member, IEEE, Min-You Wu, Senior Member, IEEE

    E-Print Network [OSTI]

    Wang, Xinbing

    1 On the Capacity of k-MPR Wireless Networks Ming-Fei Guo, Member, IEEE, Xinbing Wang, Member, IEEE, Min-You Wu, Senior Member, IEEE Abstract--The capacity of wireless ad hoc networks is mainly the capacity of 2-D wireless networks wherein each node can decode at most k simultaneous transmis- sions

  11. Factors Influencing a Female’s Selection of a Construction Management Degree: A Study of Junior- and Senior-Level Undergraduate Students 

    E-Print Network [OSTI]

    Ritter, Lisa M

    2014-07-24

    ) degree. This study provides a mixed-method study on what the most positive influential factors for females in selecting and remaining in a CM undergraduate degree program for Junior- and Senior-level students. The research was completed through a self...

  12. Information Surfing for Radiation Map Building R. Andres Cortez, Herbert G. Tanner Senior Member, IEEE, Ron Lumia, Fellow, IEEE and Chaouki T. Abdallah

    E-Print Network [OSTI]

    , as well as human retasking. Computer simulations and experiments were conducted to verify the asymptotic containers at places such as ports of entry or cargo holds. Human operators using radiation detectors do1 Information Surfing for Radiation Map Building R. Andres Cortez, Herbert G. Tanner Senior Member

  13. Perspectives on Project Finance

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Perspectives on Project Finance John May, Managing Partner, Stern Brothers & Co.

  14. Community Renewables Projects

    Broader source: Energy.gov [DOE]

    This webinar covered introduction and barriers to individual renewable projects, resources for community and group buy projects, and permitting guidelines.

  15. Computer Vision Project Topics Project Reports

    E-Print Network [OSTI]

    Zhu, Zhigang

    (contour projection?). step5: choose a tolerance value(3 or 5 pixels) to evaluate the image with eachComputer Vision Project Topics CSc I6716 Spring2011 #12;Project Reports 1. Introduction (problem up with Nikolaos Markou? · Key Components ­ The project is to find a target image from bunch

  16. Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2

    E-Print Network [OSTI]

    is used as a foundation for all development, land use, and transportation activities at UBC. LBS Project Services is a fee-for-service provider of development, design, and project management servicesProject Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2

  17. Training Manual for Senior and Middle Level Managers in Energy Financing |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al., 2013)OpenEnergyTrail Canyon Geothermal Project Jump to:BusinessOpen

  18. Senior Professional (SL/ST) Performance Cycle - Aggregate Results FY 2013 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool FitsProjectDataSecretary Moniz's OpenEnergySeizingDepartmentthe GlobalDepartment

  19. In Charlotte, Senior DOE Official to Amplify State of the Union, Call to

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment ofOffice ofofWindUpcomingcanGridDoesHydrogenProjectsGive Drivers More

  20. Intermediate evaluation of USAID/Cairo energy policy planning project

    SciTech Connect (OSTI)

    Wilbanks, T.J.; Wright, S.B.; Barron, W.F.; Kamel, A.M.; Santiago, H.T.

    1992-09-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an ``intermediate evaluation`` of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  1. Intermediate evaluation of USAID/Cairo energy policy planning project

    SciTech Connect (OSTI)

    Wilbanks, T.J.; Wright, S.B. ); Barron, W.F. ); Kamel, A.M. ); Santiago, H.T. )

    1992-01-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an intermediate evaluation'' of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  2. Projective ML Didier Remy

    E-Print Network [OSTI]

    Rémy, Didier

    Projective ML Didier Remy INRIA-Rocquencourt Apr 10, 1992 Abstract We propose a projective lambda calculus as the ba- sis for operations on records. Projections operate on elevations, that is, records projective ML from this calculus by adding the ML Let typing rule to the simply typed projective calculus. We

  3. Project Reports for Haida Corporation- 2010 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Reynolds Creek Hydroelectric Project ("Reynolds Creek" or the "Project") is a 5 MW hydroelectric resource to be constructed on Prince of Wales Island, Alaska, approximately 10 miles east of Hydaburg.

  4. Design Journal Instructions Please use your journal to keep a complete record of all activity related to your senior design project.

    E-Print Network [OSTI]

    Sobek II, Durward K.

    Design Journal Instructions EIND 499 Please use your journal to keep a complete record of all -- recorded. Thoroughness is the main idea. The basic journal procedures are: 1. Record the date in the upper, brainstorming session, web research, etc.) and note other participants, if any. 6. Record journal contents

  5. Project Selection - Record Keeping 

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10

    4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations.

  6. Clean Coal Projects (Virginia)

    Broader source: Energy.gov [DOE]

    This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

  7. 2016 Technology Innovation Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects FY 2016 Technology Innovation Project Briefs Demand Response TIP 292: Advanced Heat Pump Water Heater Research TIP 336: Scaled Deployment and Demonstration of Demand...

  8. Contract/Project Management

    Office of Environmental Management (EM)

    Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011...

  9. Contract/Project Management

    Office of Environmental Management (EM)

    and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- &...

  10. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- &...

  11. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- &...

  12. Contract/Project Management

    Energy Savers [EERE]

    and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP...

  13. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Final FY 2012 Pre- & Post-CAP Final...

  14. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

  15. Contract/Project Management

    Office of Environmental Management (EM)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

  16. Contract/Project Management

    Office of Environmental Management (EM)

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

  17. Contract/Project Management

    Energy Savers [EERE]

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast...

  18. Project 1640 Palomar Procedures

    E-Print Network [OSTI]

    Project 1640 Palomar Procedures Version 0.1 7/7/08 2:11:08 PM #12;2 Project 1640 Design..................................................................................................................... 1 Palomar Procedures

  19. Project Finance and Investments

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

  20. Falls Creek Hydroelectric Project

    SciTech Connect (OSTI)

    Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

    2007-06-12

    This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

  1. ACADEMIC DEPARTMENTAL CONTACTS, 2013-14 University Registrar, 7/15/2013, deptphones13-14.docx 8700 President: Kenneth P. Ruscio Washington Hall Elizabeth Knapp, Senior Asst & Dir of Johnson Prog., 8702 Exec Asst: Tudi Moncure, 8700

    E-Print Network [OSTI]

    Marsh, David

    Senior Research Asst: Melanie Mabry, 4181 8746 The College: Suzanne P. Keen (Interim, 2012-14) Lee. Dean Robert Straughan ; Asst. Dean John Jensen, 8604 Holekamp Hall Admin Assts: Melinda Coleman,8603

  2. Attention: Mana 4322 Organizational Strategy requires senior standing and all business core courses completed prior to enrollment. For a complete list of degree requirements, course descriptions, or a complete list of prerequisites for business courses,

    E-Print Network [OSTI]

    Huang, Haiying

    Attention: Mana 4322 ­ Organizational Strategy requires senior standing and all business core: Are courses or requirements that must be completed before enrollment in a course. Junior Standing Junior standing Junior standing Junior standing BBA ­ International Business Course Flow Important Reminders

  3. Summary of the report of the Senior Committee on Environmental, Safety, and Economic Aspects of Magnetic Fusion Energy

    SciTech Connect (OSTI)

    Holdren, J.P.; Berwald, D.H.; Budnitz, R.J.; Crocker, J.G.; Delene, J.G.; Endicott, R.D.; Kazimi, M.S.; Krakowski, R.A.; Logan, B.G.; Schultz, K.R.

    1987-09-10

    The Senior Committee on Environmental, Safety, and Economic Aspects of Magnetic Fusion Energy (ESECOM) has assessed magnetic fusion energy's prospects for providing energy with economic, environmental, and safety characteristics that would be attractive compared with other energy sources (mainly fission) available in the year 2015 and beyond. ESECOM gives particular attention to the interaction of environmental, safety, and economic characteristics of a variety of magnetic fusion reactors, and compares them with a variety of fission cases. Eight fusion cases, two fusion-fission hybrid cases, and four fission cases are examined, using consistent economic and safety models. These models permit exploration of the environmental, safety, and economic potential of fusion concepts using a wide range of possible materials choices, power densities, power conversion schemes, and fuel cycles. The ESECOM analysis indicates that magnetic fusion energy systems have the potential to achieve costs-of-electricity comparable to those of present and future fission systems, coupled with significant safety and environmental advantages. 75 refs., 2 figs., 24 tabs.

  4. Malheur River Wildlife Mitigation Project : 2008 Annual Report.

    SciTech Connect (OSTI)

    Kesling, Jason; Abel, Chad; Schwabe, Laurence

    2009-01-01

    In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

  5. Livingston Campus Geothermal Project The Project

    E-Print Network [OSTI]

    Delgado, Mauricio

    Livingston Campus Geothermal Project The Project: Geothermal power is a cost effective, reliable is a Closed Loop Geothermal System involving the removal and storage of approximately four feet of dirt from the entire Geothermal Field and the boring of 321 vertical holes reaching a depth of 500 feet. These holes

  6. Delegation of Approval Authority for Integrated Project Team...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PDF Document, 184 KB ID: NA Type: Organizations' Assignment of Responsibility Delegant: David Huizenga, Senior Advisor for Environmental Management Delegate: J. E. Surash, Deputy...

  7. Judge Evaluation Scoring Form for Project Technical Report PROJECT .#.: ..Project Title......

    E-Print Network [OSTI]

    Dahlberg, Teresa A.

    Judge Evaluation Scoring Form for Project Technical Report PROJECT .#.: ..Project Title of the project?) Excellent Very Good Good Fair Unsatisfactory COMMENTS: #12;Judge Evaluation Scoring Form for REU) #12;Judge Evaluation Scoring Form for Poster Presentation PROJECT.#.: ...Title.. PARTICIPANTS: DATE

  8. Sample Project Execution Plan

    Broader source: Energy.gov [DOE]

    The project execution plan (PEP) is the governing document that establishes the means to execute, monitor, and control projects.  The plan serves as the main communication vehicle to ensure that...

  9. Haida Corporation- 2010 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Reynolds Creek Hydroelectric Project ("Reynolds Creek" or the "Project") is a 5 MW hydroelectric resource to be constructed on Prince of Wales Island, Alaska, approximately 10 miles east of Hydaburg.

  10. Iskuulpa Watershed ProjectIskuulpa Watershed Project BPA Project # 199506001BPA Project # 199506001

    E-Print Network [OSTI]

    Basin Fish and Wildlife Mitigation ProjectMitigation Project Established by the CTUIR in 1995Established by the CTUIR in 1995 Provides dual benefit to fish and wildlifeProvides dual benefit to fish and wildlife while

  11. Rooftop Unit Network Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Network Project RTU Network Project Michael Brambley, Ph.D. Pacific Northwest National Laboratory Michael.Brambley@pnnl.gov (509) 375-6875 April 4, 2013 2 | Building Technologies...

  12. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    100% Post-CAP This is based on a 3-year rolling average (FY10). TPC is Total Project Cost. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup...

  13. Planning the Project Meeting 

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10

    Project group meetings must be planned well in advance. Members should be involved in completing some type of work before the next meeting. This helps the leader plan the next project meeting and makes efficient use of time.

  14. The 4-H Project 

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10

    As a 4-H volunteer, you will find that projects are useful tools for teaching a wide variety of skills to young people. This publication will help you plan and evaluate 4-H learning projects.

  15. Contract/Project Management

    Energy Savers [EERE]

    on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre-...

  16. Rabbit Project Reference Manual 

    E-Print Network [OSTI]

    Wootton, Chad

    2000-05-04

    This publication explains how to raise rabbits for a 4-H rabbit project. It discusses project options; breeds; equipment; breeding and kindling; sanitation; diseases, parasites and illnesses; processing; marketing; and grooming and showing. Although...

  17. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    within 12 months of the original CD- 34 duration. 90% 91% FY10-FY12 Seventy completions to date. Schedule Compliance, Projects greater than 5 years Duration: Projects will...

  18. Infrastructure Projects | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    conditions for many, as well as a change to the layout of the laboratory due to ancillary projects. The project has received approval to make early purchases in the...

  19. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

  20. GHPsRUS Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Battocletti, Liz

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  1. WIPP Projects Interative Map

    Broader source: Energy.gov [DOE]

    View WIPP Projects in a larger map. To report corrections, please email WeatherizationInnovation@ee.doe.gov.

  2. GHPsRUS Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Battocletti, Liz

    2013-07-09

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  3. Ferdinand Project Middleware List

    E-Print Network [OSTI]

    ://java.dzone.com/articles/case-study-how-lastfm-uses] - hornetq-vm: VM for testing of clustered scenarios [http://sourceforge.net/projects/hornetq-vm/] EvaluationFerdinand Project Middleware List Jaroslav Keznikl2 , Michal Malohlava1 , Lukás Marek1 , Petr Tma1 phone +420-266053831 #12;FERDINAND PROJECT MIDDLEWARE LIST PURPOSE The purpose of this report

  4. TEAM PROJECT: WORKING PROTOTYPE

    E-Print Network [OSTI]

    .) Value: the report is worth 10% of the Team Project grade. #12;Next steps: You will evaluateTEAM PROJECT: WORKING PROTOTYPE Due: Week of April 5-8 at time to be scheduled with GTA Format that will be polished into the final project for which you will create a final report and give a final presentation

  5. Project Description 1 Introduction

    E-Print Network [OSTI]

    VanDeGrift, Tammy

    Project Description 1 Introduction This project will investigate "commonsense computing": what, and 3. Apply our findings to changes in classroom pedagogy in ways that can be rigorously evalu- ated. 1 0736572 #12;In the exploratory part of this project, which we are proposing here, we will concentrate

  6. Kansas Advanced Semiconductor Project

    SciTech Connect (OSTI)

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-09-21

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  7. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans...

    Energy Savers [EERE]

    qualitativelysubjectively assess the project risk. The approach is modeled after project risk assessment processes outlined in standard project management texts and training...

  8. Senior Staff Upgrade

    ScienceCinema (OSTI)

    None

    2011-04-25

    information et présentation de l'activité depuis la dernière réunion en mai 1985; sont excusés: Messieurs Brianti, Picasso, Buehler-Broglin et Plasse

  9. APPENDIX C * Seniority Units

    E-Print Network [OSTI]

    MacMillan, Andrew

    Resources Rural Economy Arts, Faculty of Office of the Dean Anthropology Art and Design Art Store Drama East - Division of Technology in Education Educational Policy Studies Educational Psychology Elementary Education-op Education Mechanical Engineering Extension, Faculty of Graduate Studies and Research, Faculty of Law

  10. Senior Staff Meeting

    ScienceCinema (OSTI)

    None

    2011-04-25

    Le DG C.Rubbia informe sur les négociations avec le personnel, les discussions avec le conseil d'administration et le budget, suivi des questions

  11. Senior Staff Meeting

    ScienceCinema (OSTI)

    None

    2011-04-25

    Herbert Lengler fait l'introduction et remercie le DG, les directeurs et le vice président de l'association du personnel pour leur présence. Il parlera des activités depuis la dernière réunion et fera des commentaires sur l'"Abragam Commitee Final Report". Une discussion suivra sur plusieurs points importants.

  12. BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)

    E-Print Network [OSTI]

    BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County;BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Licensing: The Beacon project would have a nominal

  13. National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Approved by Jeffrey Makiel DOE Federal Project Director for the National Compact Stellarator Experiment II.....................................................................................1 3. PROJECT HISTORY

  14. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans...

    Broader source: Energy.gov (indexed) [DOE]

    addressing the following key elements of project management and control: Project Management Control System (PMCS) - Work breakdown structure - Baseline developmentupdate...

  15. Project Surveillance and Maintenance Plan. [UMTRA Project

    SciTech Connect (OSTI)

    Not Available

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

  16. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  17. Structuring small projects

    SciTech Connect (OSTI)

    Pistole, C.O.

    1995-11-01

    One of the most difficult hurdles facing small project developers is obtaining financing. Many major banks and institutional investors are unwilling to become involved in projects valued at less than $25 million. To gain the interest of small project investors, developers will want to present a well-considered plan and an attractive rate of return. Waste-to-energy projects are one type that can offer diversified revenue sources that assure maximum profitability. The Ripe Touch Greenhouse project, a $14.5 million waste tire-to-energy facility in Colorado, provides a case study of how combining the strengths of the project partners can help gain community and regulatory acceptance and maximize profit opportunities.

  18. Battleground Energy Recovery Project

    SciTech Connect (OSTI)

    Daniel Bullock

    2011-12-31

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ï?· Create a Showcase Waste Heat Recovery Demonstration Project.

  19. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  20. Microwave solidification project overview

    SciTech Connect (OSTI)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included.

  1. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    1999-08-24

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  2. The following message is sent on behalf of Jeremy Haefner, Provost and Senior Vice President for Academic Affairs

    E-Print Network [OSTI]

    Salvaggio, Carl

    , and Technology" And for the first time in the history of the program, we received a proposal from one of our that challenge the pedagogical paradigm of a discipline. Amanda Bao (CAST, Civil Engineering Technology, Environmental Management and Safety) PROJECT: "Implementing Screencasts Technology to Civil Engineering

  3. Mascoma: Frontier Biorefinery Project

    Broader source: Energy.gov [DOE]

    This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

  4. Integrated Project Team RM

    Office of Environmental Management (EM)

    acquisition process and will be utilized during all phases of a project life cycle. The IPT is a team of professionals representing diverse disciplines with the specific...

  5. Mentors and Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ideas. Borovsky, Joe Mentor Joe Borovsky General Interests Magnetospheric physics, solar-wind physics, solar-windmagnetosphere coupling Suggested Project Topics Theory and...

  6. Penobscot Tribe- 2012 Project

    Broader source: Energy.gov [DOE]

    With this award, the Penobscot Indian Nation will advance the preconstruction activities required to secure funding for the proposed 227-megawatt (MW) Alder Stream wind project.

  7. Bacteria TMDL Projects 

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01

    stream_source_info Bacteria TMDL projects.pdf.txt stream_content_type text/plain stream_size 2550 Content-Encoding ISO-8859-1 stream_name Bacteria TMDL projects.pdf.txt Content-Type text/plain; charset=ISO-8859-1 tx H2O... of the projects are listed below. ? Peach CreekWater Quality Improvement Project ? Monitoring and Educational Programs Focused on Bacteria and Nutrient Runoff on Dairy Operations in the LeonWatershed ? Development of the Plum CreekWPP ? Impact of Proper...

  8. Whistling Ridge Energy Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    build, own and operate the wind project and their associated facilities. The Final Environmental Impact Statement (FEIS) has been issued for the proposed Whistling Ridge...

  9. TThe {\\sc Majorana} Project

    E-Print Network [OSTI]

    The MAJORANA collaboration

    2009-10-23

    The {\\sc Majorana} Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  10. The MAJORANA project

    SciTech Connect (OSTI)

    Elliott, Steven R [Los Alamos National Laboratory

    2009-01-01

    The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  11. Power Systems Past Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    loop and its six associated substations. An upgrade of the INL loop, designed by Power Systems personnel, was completed in 1997. This project consists of transmission line...

  12. Project Reports for Kootznoowoo Incorporated- 2010 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    Thayer Lake Hydropower Development (TLHD) consists of a 1 MW+ run of the river hydropower project located in the Tongass Forest in the Admiralty Island National Monument Park that will provide the energy to the City of Angoon and Angoon Community Association (traditional tribe as recognized by Indian Reorganization Act).

  13. Spheres of influence: Ethical, legal, and social issues of the Human Genome Project: What to do with what we know

    SciTech Connect (OSTI)

    Pellerin, C. )

    1994-01-01

    Since fiscal year 1991, the U.S. Human Genome Project has spent $170.6 million in federal funds to help isolate genes associated with Huntington's disease, amyotrophic lateral sclerosis, neurofibromatosis types 1 and 2, myotonic dystrophy, and fragile X syndrome and to localize genes that predispose people to breast cancer, colon cancer, hypertension, diabetes, and Alzheimer's disease. Now come the hard part. Biology's 21st century megaproject starts to look relatively manageable compared to another challenge facing the enterprise: sorting out ethical, legal, and social issues associated with using this information. [open quotes]The Human Genome Project,[close quotes] wrote Senior Editor Barbara Jasny in the October 1 Science editorial, stretches [open quotes]the limits of the technology and the limits of our ability to ethically and rationally apply genetic information to our lives.[close quotes

  14. The human genome project

    SciTech Connect (OSTI)

    Yager, T.D.; Zewert, T.E.; Hood, L.E. )

    1994-04-01

    The Human Genome Project (HGP) is a coordinated worldwide effort to precisely map the human genome and the genomes of selected model organisms. The first explicit proposal for this project dates from 1985 although its foundations (both conceptual and technological) can be traced back many years in genetics, molecular biology, and biotechnology. The HGP has matured rapidly and is producing results of great significance.

  15. The Home Microbiome Project

    SciTech Connect (OSTI)

    Gilbert, Jack

    2014-08-25

    The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

  16. LEP Dismantling Project

    E-Print Network [OSTI]

    Poole, John; CERN. Geneva. SPS and LHC Division

    2001-01-01

    The LEP Dismantling Project has been in its operational phase since late in the year 2000. This report briefly reviews the development of the project and the current status. The report has been prepared for presentation to the Radiation Protection Committee in May 2001 and consequently it has a bias towards Radiation Protection activities.

  17. Project organizations and schedules

    SciTech Connect (OSTI)

    Briggs, R.J.

    1990-07-01

    The Superconducting Super Collider Laboratory (SSCL) faces the challenge of simultaneously carrying out a large-scale construction project with demanding cost, schedule, and performance goals; and creating a scientific laboratory capable of exploiting this unique scientific instrument. This paper describes the status of the laboratory organization developed to achieve these goals, and the major near-term schedule objectives of the project.

  18. TEAM PROJECT: USER TESTING

    E-Print Network [OSTI]

    TEAM PROJECT: USER TESTING Due: Wed April 21 (section 2) Thu April 22 (section 1) Now that you have: usability inspection, Neilsen's heuristic evaluation, pluralistic walk through, or GOMS analysis (without part of your project. You might consider a joint session with another team! Format: 3-4 page report

  19. Coal. [Great Plains Project

    SciTech Connect (OSTI)

    Not Available

    1981-03-01

    The status of various research projects related to coal is considered: gasification (approximately 30 processes) and in-situ gasification. Methanol production, retrofitting internal combustion engines to stratified charge engines, methanation (Conoco), direct reduction of iron ores, water resources, etc. Approximately 200 specific projects related to coal are considered with respect to present status. (LTN)

  20. The Home Microbiome Project

    ScienceCinema (OSTI)

    Gilbert, Jack

    2014-09-15

    The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

  1. Lawrence R. Wiencke, Ph.D. Department of Physics, Colorado School of Mines

    E-Print Network [OSTI]

    : The Clock in the Sun (spring 1995, spring 1996) Students Supervised, with Graduation Dates Eric Mayotte Ph BS (Senior Project) 2009 Jonathan Powers BS (Senior Project) 2009 David Starbuck BS (Senior Project

  2. North American LNG Project Sourcebook

    SciTech Connect (OSTI)

    2007-06-15

    The report provides a status of the development of LNG Import Terminal projects in North America, and includes 1-2 page profiles of 63 LNG projects in North America which are either in operation, under construction, or under development. For each project, the sourcebook provides information on the following elements: project description, project ownership, project status, projected operation date, storage capacity, sendout capacity, and pipeline interconnection.

  3. Safety basis academy summary of project implementation from 2007-2009

    SciTech Connect (OSTI)

    Johnston, Julie A

    2009-01-01

    During fiscal years 2007 through 2009, in accordance with Performance Based Incentives with DOE/NNSA Los Alamos Site Office, Los Alamos National Security (LANS) implemented and operated a Safety Basis Academy (SBA) to facilitate uniformity in technical qualifications of safety basis professionals across the nuclear weapons complex. The implementation phase of the Safety Basis Academy required development, delivery, and finalizing a set of 23 courses. The courses developed are capable of supporting qualification efforts for both federal and contractor personnel throughout the DOE/NNSA Complex. The LANS Associate Director for Nuclear and High Hazard Operations (AD-NHHO) delegated project responsibillity to the Safety Basis Division. The project was assigned to the Safety Basis Technical Services (SB-TS) Group at Los Alamos National Laboratory (LANL). The main tasks were project needs analysis, design, development, implementation of instructional delivery, and evaluation of SBA courses. DOE/NNSA responsibility for oversight of the SBA project was assigned to the Chief of Defense for Nuclear Safety, and delegated to the Authorization Basis Senior Advisor, Continuous Learning Chair (CDNS-ABSA/CLC). NNSA developed a memorandum of agreement with LANS AD-NHHO. Through a memorandum of agreement initiated by NNSA, the DOE National Training Center (NTC) will maintain the set of Safety Basis Academy courses and is able to facilitate course delivery throughout the DOE Complex.

  4. Using calibrated engineering models to predict energy savings in large-scale geothermal heat pump projects

    SciTech Connect (OSTI)

    Shonder, J.A.; Hughes, P.J.; Thornton, J.W.

    1998-10-01

    Energy savings performance contracting (ESPC) is now receiving greater attention as a means of implementing large-scale energy conservation projects in housing. Opportunities for such projects exist for military housing, federally subsidized low-income housing, and planned communities (condominiums, townhomes, senior centers), to name a few. Accurate prior (to construction) estimates of the energy savings in these projects reduce risk, decrease financing costs, and help avoid post-construction disputes over performance contract baseline adjustments. This paper demonstrates an improved method of estimating energy savings before construction takes place. Using an engineering model calibrated to pre-construction energy-use data collected in the field, this method is able to predict actual energy savings to a high degree of accuracy. This is verified with post-construction energy-use data from a geothermal heat pump ESPC at Fort Polk, Louisiana. This method also allows determination of the relative impact of the various energy conservation measures installed in a comprehensive energy conservation project. As an example, the breakout of savings at Fort Polk for the geothermal heat pumps, desuperheaters, lighting retrofits, and low-flow hot water outlets is provided.

  5. Using Calibrated Engineering Models To Predict Energy Savings In Large-Scale Geothermal Heat Pump Projects

    SciTech Connect (OSTI)

    Shonder, John A; Hughes, Patrick; Thornton, Jeff W.

    1998-01-01

    Energy savings performance contracting (ESPC) is now receiving greater attention as a means of implementing large-scale energy conservation projects in housing. Opportunities for such projects exist for military housing, federally subsidized low-income housing, and planned communities (condominiums, townhomes, senior centers), to name a few. Accurate prior (to construction) estimates of the energy savings in these projects reduce risk, decrease financing costs, and help avoid post-construction disputes over performance contract baseline adjustments. This paper demonstrates an improved method of estimating energy savings before construction takes place. Using an engineering model calibrated to pre-construction energy-use data collected in the field, this method is able to predict actual energy savings to a high degree of accuracy. This is verified with post-construction energy-use data from a geothermal heat pump ESPC at Fort Polk, Louisiana. This method also allows determination of the relative impact of the various energy conservation measures installed in a comprehensive energy conservation project. As an example, the breakout of savings at Fort Polk for the geothermal heat pumps, desuperheaters, lighting retrofits, and low-flow hot water outlets is provided.

  6. RIT's Master of Science in Manufacturing Leadership (MML) is designed for experienced professionals who aspire to mid-and senior-level positions in manufacturing and service organizations. The program integrates business and

    E-Print Network [OSTI]

    Savakis, Andreas

    ; enterprise and manufacturing strategies; lean operations; location strategy and facility design; stateOverview RIT's Master of Science in Manufacturing Leadership (MML) is designed for experienced professionals who aspire to mid- and senior-level positions in manufacturing and service organizations

  7. The Fast Track-Accounting program will enable outstanding senior undergraduate Accounting students to satisfy degree requirements leading to a Master's of Science in Accounting (MSA) or Master's of Science in Tax (MST)

    E-Print Network [OSTI]

    Huang, Haiying

    The Fast Track-Accounting program will enable outstanding senior undergraduate Accounting students to satisfy degree requirements leading to a Master's of Science in Accounting (MSA) or Master's of Science work is required to continue taking graduate courses. Any Fast Track - Accounting student who completes

  8. Attention: Mana 4322 Organizational Strategy requires senior standing and all business core courses completed prior to enrollment. For a complete list of degree requirements, course descriptions, or a complete list of prerequisites for business courses,

    E-Print Network [OSTI]

    Huang, Haiying

    Attention: Mana 4322 ­ Organizational Strategy requires senior standing and all business core: Are courses or requirements that must be completed before enrollment in a course. Junior standing Junior standing Junior standing Junior standing BBA - Management Course Flow Important Reminders: · ALL STUDENTS

  9. Attention: Mana 4322 Organizational Strategy requires senior standing and all business core courses completed prior to enrollment. For a complete list of degree requirements, course descriptions, or a complete list of prerequisites for business courses,

    E-Print Network [OSTI]

    Huang, Haiying

    Attention: Mana 4322 ­ Organizational Strategy requires senior standing and all business core: Are courses or requirements that must be completed before enrollment in a course. Junior standing Junior standing BBA ­ Real Estate Course Flow Important Reminders: · ALL STUDENTS are responsible for meeting

  10. Energy Efficiency Project Development

    SciTech Connect (OSTI)

    IUEP

    2004-03-01

    The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1, 2001 through December 31, 2002. At the request of the DOE, we have also included in this report additional activities during the reporting period January, 1999 through January, 2001. This additional information had been reported earlier in the Final Technical Reports that summarized activities undertaken in those earlier periods.

  11. Hydropower major rehabilitation projects

    SciTech Connect (OSTI)

    Norlin, J.A. [Army Corps of Engineers, Portland, OR (United States)

    1995-12-31

    The Corps of Engineers has developed an active Major Rehabilitation Program to handle large, long duration restoration projects. These projects are funded by specific appropriations and subsequently are required to have detailed rehabilitation plans to justify the work. The emphasis of the Major Rehabilitation Program is correcting reliability problems. Papers that were presented at Waterpower `93 discussed the basic concepts that are required in preparing a Major Rehabilitation Evaluation Report. This paper will cover the current status of each of the current major rehabilitation projects that the Corps of Engineers has in progress.

  12. LIMB demonstration project extension

    SciTech Connect (OSTI)

    Not Available

    1990-09-21

    The purpose of the DOE limestone injection multistage burner (LIMB) Demonstration Project Extension is to extend the data base on LIMB technology and to expand DOE's list of Clean Coal Technologies by demonstrating the Coolside process as part of the project. The main objectives of this project are: to demonstrate the general applicability of LIMB technology by testing 3 coals and 4 sorbents (total of 12 coal/sorbent combinations) at the Ohio Edison Edgewater plant; and to demonstrate that Coolside is a viable technology for improving precipitator performance and reducing sulfur dioxide emissions while acceptable operability is maintained. Progress is reported. 3 figs.

  13. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect (OSTI)

    Terry W. Battiest

    2008-06-11

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  14. NNSA project receives DOE Secretary's Award for Project Management...

    National Nuclear Security Administration (NNSA)

    project receives DOE Secretary's Award for Project Management Improvement | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  15. Contract/Project Management

    Office of Environmental Management (EM)

    (Post- RCACAP) 80% Cleanup 86% Cleanup 67% Pre-CAP 88% Post-CAP This is based on a 3-year rolling average (FY09 to FY11, Note: zero cleanup projects completed in FY09). TPC is...

  16. CNEEC - Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of developing systems that can lead to break-out high-efficiency, cost-effective solar energy-to-fuel technologies. The projects are closely tied together through two mechanisms:...

  17. Hualapai Tribe- 2010 Project

    Broader source: Energy.gov [DOE]

    The project will build on the potential for renewable energy development on the Hualapai Reservation that was identified during the Phase l renewable energy resource assessment conducted by the Hualapai Tribe since 2005.

  18. Solar Forecast Improvement Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    For the Solar Forecast Improvement Project (SFIP), the Earth System Research Laboratory (ESRL) is partnering with the National Center for Atmospheric Research (NCAR) and IBM to develop more...

  19. AVTA: The EV Project

    Broader source: Energy.gov [DOE]

    The EV Project partnered with city, regional and state governments, utilities, and other organizations in 18 cities to deploy about 12,500 public and residential charging stations.  It also...

  20. Winnebago Tribe- 2014 Project

    Broader source: Energy.gov [DOE]

    Following through with the Winnebago Tribe's commitment to reduce energy usage and consumption, the Winnebago Tribe Solar Project will focus on renewable energy production and energy cost savings consistent with protecting our natural environment.

  1. Offshore Wind Project Map

    Broader source: Energy.gov [DOE]

    Image that shows the demonstration project site and developer headquarters for two funding opportunity announcements: the 2011 Grants for Technology Development and the 2011 Grants for Removing Market Barriers.

  2. QUEST2 Energy Project 

    E-Print Network [OSTI]

    Clary, A. T.

    2007-01-01

    methodical process to identify primarily behavioral or procedural opportunities to improve energy efficiency. A key component of this process was to put control plans in place to maintain any gains that were achieved. The project resulting in finding...

  3. Portsmouth Paducah Project Office

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) established the Portsmouth/Paducah Project Office (PPPO) on October 1, 2003, to provide focused leadership to the Environmental Management missions at the...

  4. Contract/Project Management

    Energy Savers [EERE]

    76% This is a 3-year rolling average Data includes FY06 to FY08. (3748) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

  5. Federal Project Facilitators

    Office of Energy Efficiency and Renewable Energy (EERE)

    The following are U.S. Department of Energy (DOE) approved project facilitators who are required under the DOE indefinite-delivery, indefinite-quantity contract to develop federal energy savings performance contracts.

  6. PROJECTION PURSUIT Jiayang Sun

    E-Print Network [OSTI]

    Sun, Jiayang

    PROJECTION PURSUIT Jiayang Sun Many data sets are high dimensional. It has been a common practice Friedman [7], Hall [11], Morton [21], Sun [23, 24], Cook et al. [2], Li and Cheng [19] and Roosen

  7. St. Bernard Project Update

    Broader source: Energy.gov [DOE]

    The folks at St. Bernard Project are helping survivors of Hurricane Katrina get back into their homes -- and are using new technologies to reduce energy and save money for the returning residents.

  8. Project financial evaluation

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    The project financial section of the Renewable Energy Technology Characterizations describes structures and models to support the technical and economic status of emerging renewable energy options for electricity supply.

  9. Navajo Electrification Demonstraiton Project

    SciTech Connect (OSTI)

    Larry Ahasteen, Project Manager

    2006-07-17

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

  10. Lake Charles CCS Project

    SciTech Connect (OSTI)

    Leib, Thomas; Cole, Dan

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO2 per year as an integral component of commercial operations.

  11. Term Pricing Project

    E-Print Network [OSTI]

    Jeff Beckley

    2015-10-29

    Term Pricing Project. Your job is to reprice Purdue Life's 20 Year Term. You are to write a one page memo or report summarizing your work. The report should ...

  12. A Mobile Robot Project

    E-Print Network [OSTI]

    Brooks, Rodney A.

    We are building a mobile robot which will roam around the AI lab observing and later perhaps doing. Our approach to building the robot and its controlling software differs from that used in many other projects in a number ...

  13. Innovative Self- Generating Projects 

    E-Print Network [OSTI]

    Kelly, L.

    2013-01-01

    ? All rights reserved. Case Studies on Canadian Customer Generation Projects Innovative Self-Generation Projects Liam Kelly, M.A.Sc, CMVP Energy Engineer Willis Energy Services A CLEAResult company ESL-IE-13-05-06 Proceedings of the Thrity...-05-06 Proceedings of the Thrity-Fifth Industrial Energy Technology Conference New Orleans, LA. May 21-24, 2013 ? 2013 CLEAResult ? All rights reserved. Overcoming Challenges ? Look for innovative opportunities ? Leverage available incentives ? Quantify other...

  14. Black Pine Circle Project

    SciTech Connect (OSTI)

    Mytko, Christine

    2014-03-31

    A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

  15. Black Pine Circle Project

    ScienceCinema (OSTI)

    Mytko, Christine

    2014-09-15

    A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

  16. The Mississippi CCS Project

    SciTech Connect (OSTI)

    Doug Cathro

    2010-09-30

    The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

  17. Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool FitsProject Develops Student-Stakeholders ProjectBaseload

  18. Judge Evaluation Scoring Form for Project Technical Report PROJECT .#.: ..Project Title......

    E-Print Network [OSTI]

    Dahlberg, Teresa A.

    Judge Evaluation Scoring Form for Project Technical Report PROJECT .#.: ..Project Title...... #12 of the project?) Excellent Very Good Good Fair Unsatisfactory COMMENTS: #12;Judge Evaluation Scoring Form for REU and click! PROJECT TITLE REU Site: Computing Research for Undergraduates: Visualization, Virtual

  19. Project Title: Earthquake Documentary Interviews

    E-Print Network [OSTI]

    Hickman, Mark

    Project Title: Earthquake Documentary Interviews Bachelor of Arts Internship Company: Chris Thomson Academic Adviser: Mary Wiles Project Reference Number: S112/CEISMIC/29/NP - Earthquake collected on the earthquake, its survivors and their stories. This project is unique

  20. Projects of the year

    SciTech Connect (OSTI)

    Hansen, T.

    2007-01-15

    The Peabody Hotel, Orlando, Florida was the site of Power Engineering magazine's 2006 Projects of the Year Awards Banquet, which kicked-off the Power-Gen International conference and exhibition. The Best Coal-fired Project was awarded to Tri-State Generation and Transmission Association Inc., owner of Springenville Unit 3. This is a 400 MW pulverized coal plant in Springeville, AZ, sited with two existing coal-fired units. Designed to fire Powder River Basin coal, it has low NOx burners and selective catalytic reduction for NOx control, dry flue gas desulfurization for SO{sub 2} control and a pulse jet baghouse for particulate control. It has a seven-stage feedwater heater and condensers to ensure maximum performance. Progress Energy-Carolinas' Asheville Power Station FGD and SCR Project was awarded the 2006 coal-fired Project Honorable Mention. This plant in Skyland, NC was required to significantly reduce NOx emissions. When completed, the improvements will reduce NOx by 93% compared to 1996 levels and SO{sub 2} by 93% compared to 2001 levels. Awards for best gas-fired, nuclear, and renewable/sustainable energy projects are recorded. The Sasyadko Coal-Mine Methane Cogeneration Plant near Donezk, Ukraine, was given the 2006 Honorable Mention for Best Renewable/Sustainable Energy Project. In November 2004, Ukraine was among 14 nations to launch the Methane to Markets partnership. The award-winning plant is fuelled by methane released during coal extraction. It generates 42 MW of power. 4 photos.

  1. Geysers Project Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource History View New Pages RecentPlant <Silver Peak Area (DOEEnergyProject

  2. Project Analysis Standard Operating Procedure

    Office of Environmental Management (EM)

    Standard Operating Procedure (EPASOP) Issued by Office of Acquisition and Project Management MA-63 March 12, 2014 DEPARTMENT OF ENERGY Office of Acquisition and Project...

  3. Jefferson Lab Project Control System Manual

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Control System Manual Technical Engineering Development Facility (TEDF) Utilities Infrastructure Modernization (UIM) Office of Project Management Project Control...

  4. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect (OSTI)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  5. July 2015 Project Dashboard.xls

    Broader source: Energy.gov (indexed) [DOE]

    Date: 07232015 Program Contractor Project Number Project Title Original Project Budget Project Budget Monthly Overall Assessment Cost Performance Schedule Performance 1 EM...

  6. September 2015 Project Dashboard | Department of Energy

    Energy Savers [EERE]

    September 2015 Project Dashboard September 2015 Project Dashboard Post CD-2 Active Projects (as of September 29, 2015) September 2015 Project Dashboard More Documents &...

  7. Instrument validation project

    SciTech Connect (OSTI)

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells.

  8. 2020 Vision Project Summary

    SciTech Connect (OSTI)

    Gordon, K.W.; Scott, K.P.

    2000-11-01

    Since the 2020 Vision project began in 1996, students from participating schools have completed and submitted a variety of scenarios describing potential world and regional conditions in the year 2020 and their possible effect on US national security. This report summarizes the students' views and describes trends observed over the course of the 2020 Vision project's five years. It also highlights the main organizational features of the project. An analysis of thematic trends among the scenarios showed interesting shifts in students' thinking, particularly in their views of computer technology, US relations with China, and globalization. In 1996, most students perceived computer technology as highly beneficial to society, but as the year 2000 approached, this technology was viewed with fear and suspicion, even personified as a malicious, uncontrollable being. Yet, after New Year's passed with little disruption, students generally again perceived computer technology as beneficial. Also in 1996, students tended to see US relations with China as potentially positive, with economic interaction proving favorable to both countries. By 2000, this view had transformed into a perception of China emerging as the US' main rival and ''enemy'' in the global geopolitical realm. Regarding globalization, students in the first two years of the project tended to perceive world events as dependent on US action. However, by the end of the project, they saw the US as having little control over world events and therefore, we Americans would need to cooperate and compromise with other nations in order to maintain our own well-being.

  9. Radiation Embrittlement Archive Project

    SciTech Connect (OSTI)

    Klasky, Hilda B; Bass, Bennett Richard; Williams, Paul T; Phillips, Rick; Erickson, Marjorie A; Kirk, Mark T; Stevens, Gary L

    2013-01-01

    The Radiation Embrittlement Archive Project (REAP), which is being conducted by the Probabilistic Integrity Safety Assessment (PISA) Program at Oak Ridge National Laboratory under funding from the U.S. Nuclear Regulatory Commission s (NRC) Office of Nuclear Regulatory Research, aims to provide an archival source of information about the effect of neutron radiation on the properties of reactor pressure vessel (RPV) steels. Specifically, this project is an effort to create an Internet-accessible RPV steel embrittlement database. The project s website, https://reap.ornl.gov, provides information in two forms: (1) a document archive with surveillance capsule(s) reports and related technical reports, in PDF format, for the 104 commercial nuclear power plants (NPPs) in the United States, with similar reports from other countries; and (2) a relational database archive with detailed information extracted from the reports. The REAP project focuses on data collected from surveillance capsule programs for light-water moderated, nuclear power reactor vessels operated in the United States, including data on Charpy V-notch energy testing results, tensile properties, composition, exposure temperatures, neutron flux (rate of irradiation damage), and fluence, (Fast Neutron Fluence a cumulative measure of irradiation for E>1 MeV). Additionally, REAP contains data from surveillance programs conducted in other countries. REAP is presently being extended to focus on embrittlement data analysis, as well. This paper summarizes the current status of the REAP database and highlights opportunities to access the data and to participate in the project.

  10. Project Plan Remote Target Fabrication Refurbishment Project

    SciTech Connect (OSTI)

    Bell, Gary L; Taylor, Robin D

    2009-08-01

    In early FY2009, the DOE Office of Science - Nuclear Physics Program reinstated a program for continued production of {sup 252}Cf and other transcurium isotopes at the Radiochemical Engineering Development Center (REDC) at Oak Ridge National Laboratory (ORNL). The FY2009 major elements of the workscope are as follows: (1) Recovery and processing of seven transuranium element targets undergoing irradiation at the High Flux Isotope Reactor (HFIR) at ORNL; (2) Development of a plan to manufacture new targets for irradiation beginning in early- to mid-FY10 to supply irradiated targets for processing Campaign 75 (TRU75); and (3) Refurbishment of the target manufacturing equipment to allow new target manufacture in early FY10 The {sup 252}Cf product from processing Campaign 74 (recently processed and currently shipping to customers) is expected to supply the domestic demands for a period of approximately two years. Therefore it is essential that new targets be introduced for irradiation by the second quarter of FY10 (HFIR cycle 427) to maintain supply of {sup 252}Cf; the average irradiation period is {approx}10 HFIR cycles, requiring about 1.5 calendar years. The strategy for continued production of {sup 252}Cf depends upon repairing and refurbishing the existing pellet and target fabrication equipment for one additional target production campaign. This equipment dates from the mid-1960s to the late 1980s, and during the last target fabrication campaign in 2005- 2006, a number of component failures and operations difficulties were encountered. It is expected that following the target fabrication and acceptance testing of the targets that will supply material for processing Campaign 75 a comprehensive upgrade and replacement of the remote hot-cell equipment will be required prior to subsequent campaigns. Such a major refit could start in early FY 2011 and would take about 2 years to complete. Scope and cost estimates for the repairs described herein were developed, and authorization for the work was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

  11. AIDP -Apple Interface Design Project

    E-Print Network [OSTI]

    Tollmar, Konrad

    AIDP - Apple Interface Design Project AIDP - Apple Interface Design Project m 92-95 m Joy Mountford m Design Centre, Advanced Technology Group m Apple's Industrial Design Group "Encourage ProjectThe Project m Bridge the gulf between the physical and virtual worlds - Apple m Design a new way

  12. Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of CHP project profiles.

  13. Innovation Program Student Initiated Project

    E-Print Network [OSTI]

    Bertini, Robert L.

    Innovation Program Student Initiated Project Proposal Guidelines Eligibility The team must include of the problem the innovation is meant to solve A clear description of the work to be done for the project Milestones for the project, as well as a projected 'end product' Background with enough detail

  14. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    and evaluate web-based application which could utilize sensor data. In this project, we focused on two aspectsDegree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden Y E T I A N A Web This thesis describes the project "A new Web Server for sensors". The project has created a demonstration web

  15. Enhanced Geothermal Systems Demonstration Projects

    SciTech Connect (OSTI)

    Geothermal Technologies Office

    2013-08-06

    Several Enhanced Geothermal Systems (EGS) demonstration projects are highlighted on this Geothermal Technologies Office Web page.

  16. Project Management Plan Chinese Food

    E-Print Network [OSTI]

    Igusa, Kiyoshi

    impact of this project? · Data management: How do we collect, preserve and sort all of the files? Which special equipment, facilities needed or wanted? According to http://project-management-knowledge.com/ weProject Management Plan Chinese Food According to NSF, the basic elements of a project management

  17. Cogeneration Project Analysis Update 

    E-Print Network [OSTI]

    Robinson, A. M.; Garcia, L. N.

    1987-01-01

    -1 ------------ COGENERATION PROJECT ANALYSIS UPDATE by Arthur M. Robinson & Luis N. Garcia ROBINSON & GARCIA Energy Consultants P. O. Box 1203, Destrehan, LA 70047 ABSTRACT Not long ago, to evaluate the feasibility of a cogeneration project, a simple economic analysis... pressure steam produced from the turbine exhaust. And fed to an extraction condensing steam turbine, coupled to a second generator. A depiction with typical values is shown in Figure 2. ~) ~ EL.eCTRICJTY FRCM (iE/.)eRATORS BoiLE.R GAS / Fl/EL R...

  18. CONNECTICUT BIOFUELS TECHNOLOGY PROJECT

    SciTech Connect (OSTI)

    BARTONE, ERIK

    2010-09-28

    DBS Energy Inc. (“DBS”) intends on using the Connecticut Biofuels Technology Project for the purpose of developing a small-scale electric generating systems that are located on a distributed basis and utilize biodiesel as its principle fuel source. This project will include research and analysis on the quality and applied use of biodiesel for use in electricity production, 2) develop dispatch center for testing and analysis of the reliability of dispatching remote generators operating on a blend of biodiesel and traditional fossil fuels, and 3) analysis and engineering research on fuel storage options for biodiesel of fuels for electric generation.

  19. Investor Confidence Project 

    E-Print Network [OSTI]

    Golden, M.

    2013-01-01

    Environmental Defense Fund’s Investor Confidence Project Delivering Investment Quality Energy Efficiency to Market ESL-KT-13-12-38 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Investor Confidence Project... Actionable Data ESL-KT-13-12-38 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Near-Term: Not Enough Deal-Flow • High Transaction Costs • Lack of Viable Origination Channels • Highly Variable Performance • Complex...

  20. Showcasing a Project 

    E-Print Network [OSTI]

    Miller, Kari

    2007-01-01

    Dr. John Sij, an agronomist at The Texas A&M University System Agricultural Research and Extension Center at Vernon. Story by Kari Miller SHOWCASING A PROJECT Groups work to solve stream?s impairment... present and most of them were landowners in that watershed,? he said. ?That was one of the Showcasing a Project tx H2O | pg. 9 best-attended meetings of landowners we?ve probably had in the state.? The team is bringing in Dr. George Di Giovanni...

  1. Projects | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions |(Conference)Project Tour Project Tour

  2. Background & Projects Publications

    E-Print Network [OSTI]

    Home Background & Projects Calendar Publications Staff Directory Links Search MAES Home | Field Stations | Station Home | Publications | FruitNet Weekly Report Northern Michigan FruitNet 2006 Weekly vineyards. Side hedging and/or topping shoots will be needed to get light and air to the fruiting zone

  3. Rank Project Name Directorate,

    E-Print Network [OSTI]

    ,000 0.5 400 lbs industrial waste, eliminates potential for oil contaminated run-off 3 RetrofitRank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1 Minimization of Silver Waste from Silver-Staining Electrophoretic Mini-Gels Life Sciences, Biology (B

  4. Project Summary Partnership Inspiration

    E-Print Network [OSTI]

    Everest, Graham R

    Businesses are hunting for solutions to reduce their carbon footprint and energy spend. This project follows as they help overcome the challenges of auditing and reducing the organisational carbon footprint. A television strategy underpinning their carbon footprint understanding and slashing carbon emissions by 10

  5. Final Year Project Report

    SciTech Connect (OSTI)

    Hubsch, Tristan

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  6. Kootznoowoo Incorporated- 2010 Project

    Broader source: Energy.gov [DOE]

    Thayer Lake Hydropower Development (TLHD) consists of a 1 MW+ run of the river hydropower project located in the Tongass Forest in the Admiralty Island National Monument Park that will provide the energy to the City of Angoon and Angoon Community Association (traditional tribe as recognized by Indian Reorganization Act).

  7. Pioneering Heat Pump Project

    Broader source: Energy.gov [DOE]

    Project objectives: To install and monitor an innovative WaterFurnace geothermal system that is technologically advanced and evolving; To generate hot water heating from a heat pump that uses non-ozone depleting refrigerant CO2. To demonstrate the energy efficiency of this system ground source heat pump system.

  8. Universitt Project EURAT

    E-Print Network [OSTI]

    Heermann, Dieter W.

    of individual people in far less time today than at the conclusion of the Human Genome Project in 2003 (Collins of Whole Human Genome Sequencing" Position Paper Cornerstones for an ethiCally and legally informed Pra 60 61 63 65 67 69 70 71 73 88 96 100 #12;4 5Ethical and Legal Aspects of Whole Human Genome

  9. Information Technology Project Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-12

    This Guide provides Department of Energy recommended guidelines to ensure that the acquisition of information technology capital assets is performed in compliance with DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE N 251.105.

  10. Environmental of Forestry Projects

    E-Print Network [OSTI]

    Environmental Impact Assessment of Forestry Projects #12;EnvironmentalImpactAssessment 2 Flow chart Details of the Environmental Statement publicised for comment FC considers ES and any comments received FC the issues of concern that need to be covered in the Environmental Statement (ES). The Environmental

  11. PROJECT PROPOSAL FPGA PAINT

    E-Print Network [OSTI]

    PROJECT PROPOSAL FPGA PAINT Design of Embedded Systems, Advanced Course Faculty to develop a paint program on Digilent Nexys2 FPGA board. We expect it to be a platform of painting on a plain space or painting an existing picture outline with color. There would be options for changing

  12. Baytown Cogeneration Project 

    E-Print Network [OSTI]

    Lorenz, M. G.

    2007-01-01

    The Baytown Cogeneration Project installed a GE 7FA gas turbine generator that produces 160 MW of electricity and 560-klB/hr of superheated 1500-psig steam. All of the steam and electricity are consumed by the ExxonMobil Refinery & Chemical Plant...

  13. Accounting Projects Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    and international tax work for individuals, closely held companies, family offices and clients expecting a liquidityAccounting Projects Company Description: CPA firm performing accounting services, bookkeeping. Company Description: a full service CPA firm headquartered in the San Francisco Bay Area. Nationally

  14. Project Title: Residential wind turbine design Project Description: This project aims to

    E-Print Network [OSTI]

    Muradoglu, Metin

    that wind is expected to come. Therefore it may be a good idea to consider a vertical-axis wind turbine of the conventional wind turbines use horizontal- axis configuration (see Fig. 1) and is aligned with the directionPROJECT 1: Project Title: Residential wind turbine design Project Description: This project aims

  15. Reducing Poverty Risk in Developing Countries Project No. Project Title Project Leader

    E-Print Network [OSTI]

    Krivobokova, Tatyana

    1 Reducing Poverty Risk in Developing Countries Project No. Project Title Project Leader 1 Dynamic). At the same time, there will be substantial collaboration between the projects to develop this common research in developing countries Lay 5 Informal risk sharing networks as an strategy to reduce poverty risk Ibanez

  16. Ceramic Technology Project

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    The Ceramic Technology Project was developed by the USDOE Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS's Materials Development Program, was developed to meet the ceramic technology requirements of the OTS's automotive technology programs. Significant accomplishments in fabricating ceramic components for the USDOE and NASA advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. These programs have also demonstrated that additional research is needed in materials and processing development, design methodology, and data base and life prediction before industry will have a sufficient technology base from which to produce reliable cost-effective ceramic engine components commercially. A five-year project plan was developed with extensive input from private industry. In July 1990 the original plan was updated through the estimated completion of development in 1993. The objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on the structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines. To facilitate the rapid transfer of this technology to US industry, the major portion of the work is being done in the ceramic industry, with technological support from government laboratories, other industrial laboratories, and universities.

  17. California Hydrogen Infrastructure Project

    SciTech Connect (OSTI)

    Edward C. Heydorn

    2013-03-12

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a ���¢��������real-world���¢������� retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation���¢��������s hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations with a focus on safe, convenient, fast-fills. These potential areas were then compared to and overlaid with suitable sites from various energy companies and other potential station operators. Work continues to match vehicle needs with suitable fueling station locations. Once a specific site was identified, the necessary agreements could be completed with the station operator and expected station users. Detailed work could then begin on the site drawings, permits, safety procedures and training needs. Permanent stations were successfully installed in Irvine (delivered liquid hydrogen), Torrance (delivered pipeline hydrogen) and Fountain Valley (renewable hydrogen from anaerobic digester gas). Mobile fueling stations were also deployed to meet short-term fueling needs in Long Beach and Placerville. Once these stations were brought online, infrastructure data was collected and reported to DOE using Air Products���¢�������� Enterprise Remote Access Monitoring system. Feedback from station operators was incorporated to improve the station user���¢��������s fueling experience.

  18. UWA Renewable Energy Vehicle Project Available Projects: 2nd

    E-Print Network [OSTI]

    1 UWA Renewable Energy Vehicle Project Available Projects: 2nd Semester 2005 Time commitment values materials and distribute 4) Educate team on marketing strategies 5) Contact potential sponsors, media

  19. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    10/12/2012 Update to WBS Level 2 Threshold (top of page 20), Change DOE Federal Project Director ..............................................................................................................................1 1.2.1 DOE-approved project documents:..............................................................................................1 1.2.2 DOE certified institutional systems or plans

  20. Project Reports for San Carlos Apache Tribe- 2012 Project

    Broader source: Energy.gov [DOE]

    Under this project, the San Carlos Apache Tribe will study the feasibility of solar energy projects within the reservation with the potential to generate a minimum of 1 megawatt (MW).

  1. Evaluation of Technology Risk in Project Cogeneration Project Returns 

    E-Print Network [OSTI]

    Thoennes, C. M.

    1985-01-01

    The economic returns of a cogeneration project are a direct function of the project margin, that is, the difference between revenues and expenses. Revenues and expenses, of course, are made up of both variable and fixed components. The revenues...

  2. Nucla CFB Demonstration Project

    SciTech Connect (OSTI)

    Not Available

    1990-12-01

    This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

  3. Healy Clean Coal Project

    SciTech Connect (OSTI)

    None

    1997-12-31

    The Healy Clean Coal Project, selected by the U.S. Department of Energy under Round 111 of the Clean Coal Technology Program, has been constructed and is currently in the Phase 111 Demonstration Testing. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the U.S. Department of Energy. Construction was 100% completed in mid-November of 1997, with coal firing trials starting in early 1998. Demonstration testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of nitrogen oxides (NOx), sulfur dioxide (S02), and particulate from this 50-megawatt plant are expected to be significantly lower than current standards.

  4. The Nautilus project

    SciTech Connect (OSTI)

    Salis, J. de

    1996-02-01

    The objective of the Nautilus project is to design, build, and evaluate a subsea multiphase electrical booster system to demonstrate its operability and reliability. The subsea station will reflect the integration of existing, tested, and recently developed equipment. The integration of various technologies, control, and maintenance in a subsea environment represents the challenging aspect of the project. Boosted by a helicoaxial pump, the produced multiphase effluent receives enough energy to reach either a host platform or the shore where the classical separation and treatment operations are performed. For deep offshore developments, the concept should induce a lower investment than alternative solutions. The concept should also give access to marginal fields, currently undeveloped for economical reasons, with the benefit of maximizing existing infrastructure. Furthermore, where sea traffic or environment concerns may limit offshore surface developments, Nautilus should demonstrate itself as an economical alternative.

  5. Debt collection project report

    SciTech Connect (OSTI)

    Not Available

    1980-05-01

    In October 1979 the Office of Management and Budget initiated a review of debt collection within the Federal Government. A DOE Debt Collection Project Team was established, and seven activites were selected for review. These were Albuquerque Operations Office; Bonneville Power Administration; Chicago Operations and Regional Office; Naval Petroleum Reserves, California; Oak Ridge Operations Office; Washington Financial Services Division; and Western Area Power Administration. The team visited each of these activities to collect data on the size, age, and types of receivables managed and procedures for billing, aging, and handling overdue accounts. Various deficiencies were found to exist at several of the DOE entities that are not consistent with good management practices in the performance of their debt collection functions. Also, the Debt Collection Project Team identified a wide variation in the procedures followed by DOE activities in the management of accounts receivable, and a wide variation in the effectiveness of the debt management functions. 1 figure, 17 tables. (RWR)

  6. Forecasting potential project risks through leading indicators to project outcome 

    E-Print Network [OSTI]

    Choi, Ji Won

    2007-09-17

    for the degree of MASTER OF SCIENCE May 2007 Major Subject: Civil Engineering FORECASTING POTENTIAL PROJECT RISKS THROUGH LEADING INDICATORS TO PROJECT OUTCOME A Thesis by JI WON CHOI... Guikema Head of Department, David Rosowsky May 2007 Major Subject: Civil Engineering iii ABSTRACT Forecasting Potential Project Risks through Leading Indicators to Project Outcome. (May 2007) Ji Won Choi, B.S., Han-Yang University...

  7. Baytown Energy Project 

    E-Print Network [OSTI]

    Porter, J.

    2006-01-01

    Mobil's Baytown Chemical Plant, the Baytown Energy Project (BEP) utilized this planning strategy to redeploy assets by changing the fractionation configuration of the plant. In the aromatics recovery plant, aromatics (benzene, toluene and xylenes... prefractionator followed by a set of integrated towers to separate the ternary product mixture of benzene toluene and xylenes from a toluene disproportionation unit. The towers also fractionated a concentrated benzene and toluene sidestream from the primary...

  8. Advanced Biomass Gasification Projects

    SciTech Connect (OSTI)

    Not Available

    1997-08-01

    DOE has a major initiative under way to demonstrate two high-efficiency gasification systems for converting biomass into electricity. As this fact sheet explains, the Biomass Power Program is cost-sharing two scale-up projects with industry in Hawaii and Vermont that, if successful, will provide substantial market pull for U.S. biomass technologies, and provide a significant market edge over competing foreign technologies.

  9. Popeye Project: Subsea system

    SciTech Connect (OSTI)

    Ritter, P.B.; Langner, C.G.; Sgouros, G.E.; Saucier, B.J.; Voss, R.K.

    1996-12-31

    The subsea system installed for Shell Offshore Inc. (SOI) Popeye Project represents an advancement in deep water subsea technology. It is a diverless, guidelineless, 10,000 psi cluster manifold concept, the first of its kind. The cluster concept was selected in large part based on SOI`s deep water experience and anticipated future subsea development needs. This paper describes how the innovative Popeye subsea system was selected, designed, tested, and successfully installed.

  10. Popeye project: Subsea system

    SciTech Connect (OSTI)

    Ritter, P.B.; Sgouros, G.E.; Langner, C.G.; Saucier, B.J.; Voss, R.K.

    1997-12-01

    The subsea system installed for the Shell Offshore Inc. (SOI) Popeye project represents an advance in deepwater subsea technology. It is a diverless, guidelineless, 10,000-psi cluster-manifold concept, the first of its kind. The cluster concept was selected in large part based on SOI`s deepwater experience and anticipated future subsea-development needs. This paper describes how the innovative Popeye subsea system was selected, designed, tested, and successfully installed.

  11. BETO Active Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based Fuels Research atDepartmentAuditsDepartmentj.BETO Active Project

  12. Desert Peak EGS Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based| Department8, 20153Danielthrough theKDesert Peak EGS Project DOE Award:

  13. Project Submission Template

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget | DepartmentLogisticalProjectDepartmentCooperation

  14. The Human Genome Diversity Project

    SciTech Connect (OSTI)

    Cavalli-Sforza, L.

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  15. The IPHI Project

    SciTech Connect (OSTI)

    Ferdinand, Robin; Beauvais, Pierre-Yves

    2005-06-08

    High Power Proton Accelerators (HPPAs) are studied for several projects based on high-flux neutron sources driven by proton or deuteron beams. Since the front end is considered as the most critical part of such accelerators, the two French national research agencies CEA and CNRS decided to collaborate in 1997 to study and build a High-Intensity Proton Injector (IPHI). The main objective of this project is to master the complex technologies used and the concepts of manufacturing and controlling the HPPAs. Recently, a collaboration agreement was signed with CERN and led to some evolutions in the design and in the schedule. The IPHI design current was maintained at 100 mA in Continuous Wave mode. This choice should allow to produce a high reliability beam at reduced intensity (typically 30 mA) tending to fulfill the Accelerator Driven System requirements. The output energy of the Radio Frequency Quadrupole (RFQ), was reduced from 5 to 3 MeV, allowing then the adjunction and the test, in pulsed operation of a chopper line developed by CERN for the Superconducting Proton Linac (SPL). In a final step, the IPHI RFQ and the chopper line should become parts of the SPL injector. In this paper, the IPHI project and the recent evolutions are reported together with the construction and operation schedule.

  16. Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  17. Final Project Report

    SciTech Connect (OSTI)

    Bogucz, E A

    2010-12-13

    This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for “intelligent nested environmental systems technologies (iNEST),” which monitor and control energy flows and IEQ across a cascade of spaces from individuals’ desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoE’s Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuse’s Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoE’s website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

  18. Final project report

    SciTech Connect (OSTI)

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  19. NREL Smart Grid Projects

    SciTech Connect (OSTI)

    Hambrick, J.

    2012-01-01

    Although implementing Smart Grid projects at the distribution level provides many advantages and opportunities for advanced operation and control, a number of significant challenges must be overcome to maintain the high level of safety and reliability that the modern grid must provide. For example, while distributed generation (DG) promises to provide opportunities to increase reliability and efficiency and may provide grid support services such as volt/var control, the presence of DG can impact distribution operation and protection schemes. Additionally, the intermittent nature of many DG energy sources such as photovoltaics (PV) can present a number of challenges to voltage regulation, etc. This presentation provides an overview a number of Smart Grid projects being performed by the National Renewable Energy Laboratory (NREL) along with utility, industry, and academic partners. These projects include modeling and analysis of high penetration PV scenarios (with and without energy storage), development and testing of interconnection and microgrid equipment, as well as the development and implementation of advanced instrumentation and data acquisition used to analyze the impacts of intermittent renewable resources. Additionally, standards development associated with DG interconnection and analysis as well as Smart Grid interoperability will be discussed.

  20. Guest Project: Personal Information Title of the Project

    E-Print Network [OSTI]

    ! ! Guest Project: Personal Information ! ! Title of the Project: ! ! Project Coordinator: ! Name? ! 1. 2. 3... #12;! Rules and Acceptance: ! The primary purpose of the ICTP SciFabLab is to support, models, and codes developed within the ICTP Scientific FabLab as open source / open hardware

  1. Financing Energy Projects in Dow 

    E-Print Network [OSTI]

    Dingwall, D. C.

    1984-01-01

    in size, and authorized and financed as a part of Dow's regular capital program. Capital projects relating to the more efficient generation of energy generally refer to DOW'S large Gulf Coast combined cycle cogeneration projects, most of which came...

  2. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    cloud. This thesis project designed, implemented, and evaluated the use of open shortest path firstDegree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden A M I R R O O Z B

  3. Environmental Management (EM) Cleanup Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

  4. Risk Management In Major Projects 

    E-Print Network [OSTI]

    Baker, Scott William

    The integration of risk management in major projects within the construction and oil and gas industries has never been more significant especially as these projects are becoming larger and more complex. The increased ...

  5. Geothermal Outreach and Project Financing

    SciTech Connect (OSTI)

    Elizabeth Battocletti

    2006-04-06

    The ?Geothermal Outreach and Project Financing? project substantially added to the understanding of geothermal resources, technology, and small business development by both the general public as well as those in the geothermal community.

  6. Smart Grid Demonstration Project

    SciTech Connect (OSTI)

    Miller, Craig; Carroll, Paul; Bell, Abigail

    2015-03-11

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and posted for universal access at www.nreca.coop/smartgrid. This research is available for widespread distribution to both cooperative members and non-members. These reports are listed in Table 1.2. Interoperability: The deliverable in this area was the advancement of the MultiSpeak™ interoperability standard from version 4.0 to version 5.0, and improvement in the MultiSpeak™ documentation to include more than 100 use cases. This deliverable substantially expanded the scope and usability of MultiSpeak, ™ the most widely deployed utility interoperability standard, now in use by more than 900 utilities. MultiSpeak™ documentation can be accessed only at www.multispeak.org. Cyber Security: NRECA’s starting point was to develop cyber security tools that incorporated succinct guidance on best practices. The deliverables were: cyber security extensions to MultiSpeak,™ which allow more security message exchanges; a Guide to Developing a Cyber Security and Risk Mitigation Plan; a Cyber Security Risk Mitigation Checklist; a Cyber Security Plan Template that co-ops can use to create their own cyber security plans; and Security Questions for Smart Grid Vendors.

  7. Why Cogeneration Development Projects Fail 

    E-Print Network [OSTI]

    Greenwood, R. W.

    1987-01-01

    ENERATION DEVElDHmNT PROJECTS FAIL RALPH w. GRBBtMX>D Regional Manager Bbasco Services Incorporated Houston, Texas ABSTRACT Cogeneration projects that are organized by developers fail to reach fruition for reasons other than the basic economical... here to discuss those additional problems unique to small projects. A developnent project is defined as one where a third party, the developer, provides preliminary econanic options, licensing, business structure, financing, detailed engineering...

  8. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden G U O J U N W A N Abstract The goal of this thesis project is to improve industrial system testing efficiency. The thesis. The work load for testers can be decreased and more projects could be carried out in parallel

  9. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    and competitive activities which in this thesis project were evaluated in a educational process contextDegree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden F R A N C I S C O interaction in areas, such as health care, computer games, and robotics. Although many research projects have

  10. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden A L I S A R R A F(KTH) Kista, Stockholm, Sweden. #12;#12;Abstract Today, the number of software projects having large number of tools that have evolved to improve the quality of development in such projects. In addition, building

  11. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden S A A D A H M E D, Sweden #12;Abstract The project focuses on the packaging process of the smart card manufacturing industry. The idea of the project concerns how to increase production packaging efficiency by introducing a control

  12. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    of the main achievements of this thesis project. Evaluation of the measurement results indicates that fiberDegree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden M O Z H G A N for small cell backhaul. This thesis project investigates if a small cell network's requirements can

  13. The Piazza Project Presented by

    E-Print Network [OSTI]

    Ives, Zachary G.

    The Piazza Project Presented by: Mengmeng Liu and Shirley Cohen CIS 650 #12;Agenda · Project aspects #12;Piazza Project Members AnHai Doan Oren Etzioni Steven Gribble Zack Ives Alon Halevy Jayant (PDMS): · n mediated peer schemas as few as (n - 1) mappings between them ­ evaluated transitively · m

  14. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    by a review of related work. The overall project's goal is to create and evaluate an authorization schemaDegree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden A L E X I S M A R #12;#12;i Abstract This master's thesis project began at the Karolinska University Hospital

  15. Addendum to Fake Projective Planes

    E-Print Network [OSTI]

    Yeung, Sai-Kee

    ingenious group theoretic computations that the twenty eight classes of fake projective planes altogether- damental group of eight of the one hundred fake projective planes do not admit an embedding into SU(2, 1. In [1] we proved that if the fundamental group of a fake projective plane is an arithmetic subgroup

  16. Office: ITO PE/Project

    E-Print Network [OSTI]

    Mills, Kevin

    Mgr.: Mills/Swinson PAD No.: Smart Spaces Moving Through Smart Spaces "city-wide appliances" "in1 DARPA Office: ITO PE/Project: Pgm No.: Pgm Mgr.: Mills/Swinson PAD No.: Smart Spaces Personal Information Projection · Develop techniques for projecting personal information from cyberspace into smart

  17. Indian River Hydroelectric Project Grant

    SciTech Connect (OSTI)

    Rebecca Garrett

    2005-04-29

    This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

  18. Summer Student Project Report

    E-Print Network [OSTI]

    Kazan, Oguz

    2013-01-01

    My project covered a preliminary R&D phase in which an HPD tube with 163-pixels and external readout was tested. The external readout electronics were based on the existing Beetle front-end chip. The HPD performance for single-photon detection was assessed. The experimental setup made use of a fast laser light sources and an electronics readout chain specifically developed for laboratory tests. In parallel to the measurements, I improved the software which was used to make measurements and to display the data in a useful way.

  19. Project Earth Lover

    SciTech Connect (OSTI)

    Slobotski, Stephanie,

    2011-09-01

    Under this project, the Ponca Tribe of Nebraska (PTN) will conduct An Energy Options Analysis (EOA) to empower Tribal Leadership with critical information to allow them to effectively screen energy options that will further develop the Tribe's long-term strategic plan and energy vision. The PTN will also provide community workshops to enhance Tribal Members' capabilities, skills and awareness of energy efficiency and conservation technology and practices. A 90- minute workshop will be conducted at each of the 5 sites and one-hundred tribal members will receive an erergy efficiency kit.

  20. Indonesia project underway

    SciTech Connect (OSTI)

    Not Available

    1988-12-01

    Unocal Corporation has given the Indonesian Government notice of intent to proceed with a geothermal project to provide steam for a 110 megawatt electrical generating plant. The company has drilled 11 wells, and has confirmed reserves for more than 230 megawatts of generating capacity. Indonesia's state electric company, PLN, will build the power plant. Ansaldo, an Italian company, will supply equipment and manage the construction. With the notice of intent to proceed, Unocal Geothermal of Indonesia, Ltd. will begin drilling additional wells and build the field facilities necessary to provide steam to the power plant.

  1. Autostereoscopic projection viewer

    DOE Patents [OSTI]

    Toeppen, John S. (Livermore, CA)

    2006-12-19

    An autostereoscopic viewer is employed to produce aberration corrected images to simulate a virtual presence by employing pairs of projector optical components coupled with an image corrector plate and a field lens. Images are designed with magnifications and optical qualities and positioned at predetermined eyezones having controlled directional properties. The viewer's eyes are positioned in these eyezones. The size of these zones is related to the aperture of the projection lenses, the magnification produced by the Fresnel(s), and the optical properties and position of the image corrector plate.

  2. Buckman Direct Diversion Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B L OBransen PlasmaEnergy, science,Buckman Direct Diversion Project

  3. ARM Observations Projected

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsicloudden Documentation Data Management Facility PlotsProductsObservations Projected

  4. NREL: Transportation Research - Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass map shines lightGeospatial ToolkitSMARTSWorking With UsSimulatorTruckNewsProjects

  5. PSERC Current Projects Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy Bills andOrder 422.1, CONDUCT P - . . -Pathways)PROJECT SUMMARY 11OE0000652

  6. Sandia National Laboratories: Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust, High-ThroughputUpcoming Release of thePrograms:Mode Stirred ChamberReuse ReuseProjects

  7. Protection Upgrades Project (4580)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions |(Conference)ProjectProposedAmerica'sTrap and

  8. Production Project Accounts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II) by Carbon-Rich Matrices inPrincipalFirmProduction Project Accounts

  9. Project File System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II) by Carbon-Rich Matricesstudents working1999-2000University 4 Project

  10. Savings Project: Lower Water Heating Temperature | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savings Project: Lower Water Heating Temperature Savings Project: Lower Water Heating Temperature Addthis Project Level Easy Energy Savings 12-30 annually for each 10F...

  11. Pacific Direct Current Intertie (PDCI) Upgrade Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Reliability Projects Expand Projects Skip navigation links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement...

  12. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Reliability Projects Expand Projects Skip navigation links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement...

  13. June 2015 Project Dashboard | Department of Energy

    Office of Environmental Management (EM)

    June 2015 Project Dashboard June 2015 Project Dashboard June 2015 Project Dashboard.pdf More Documents & Publications The Weekend Ozone Effect - The Weekly Ambient Emissions...

  14. Preparing for Project Implementation Assigning Accountability...

    Office of Environmental Management (EM)

    Assigning Accountability for Each Project, April 14, 2010 Preparing for Project Implementation Assigning Accountability for Each Project, April 14, 2010 Assigning Accountability...

  15. Searchlight Wind Energy Project FEIS Appendix E

    Office of Environmental Management (EM)

    June 2, 2009 District Las Vegas Field Office Resource Area Activity (program) Proposed Wind Generation SECTION A. PROJECT INFORMATION 1. Project Name Searchlight Wind Project 4....

  16. SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Tracking Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking Checklist The following checklist is intended to provide system owners, project...

  17. project information | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Information Biomass Feed and Gasification Archived Projects Agreement Number Project Title Performer Name Technology Area FE0023577 Advanced Gasifier and Water Gas Shift...

  18. Projection optics box

    DOE Patents [OSTI]

    Hale, Layton C. (Livermore, CA); Malsbury, Terry (Tracy, CA); Hudyma, Russell M. (San Ramon, CA); Parker, John M. (Tracy, CA)

    2000-01-01

    A projection optics box or assembly for use in an optical assembly, such as in an extreme ultraviolet lithography (EUVL) system using 10-14 nm soft x-ray photons. The projection optics box utilizes a plurality of highly reflective optics or mirrors, each mounted on a precision actuator, and which reflects an optical image, such as from a mask, in the EUVL system onto a point of use, such as a target or silicon wafer, the mask, for example, receiving an optical signal from a source assembly, such as a developed from laser system, via a series of highly reflective mirrors of the EUVL system. The plurality of highly reflective optics or mirrors are mounted in a housing assembly comprised of a series of bulkheads having wall members secured together to form a unit construction of maximum rigidity. Due to the precision actuators, the mirrors must be positioned precisely and remotely in tip, tilt, and piston (three degrees of freedom), while also providing exact constraint.

  19. Device Oriented Project Controller

    SciTech Connect (OSTI)

    Dalesio, Leo; Kraimer, Martin

    2013-11-20

    This proposal is directed at the issue of developing control systems for very large HEP projects. A de-facto standard in accelerator control is the Experimental Physics and Industrial Control System (EPICS), which has been applied successfully to many physics projects. EPICS is a channel based system that requires that each channel of each device be configured and controlled. In Phase I, the feasibility of a device oriented extension to the distributed channel database was demonstrated by prototyping a device aware version of an EPICS I/O controller that functions with the current version of the channel access communication protocol. Extensions have been made to the grammar to define the database. Only a multi-stage position controller with limit switches was developed in the demonstration, but the grammar should support a full range of functional record types. In phase II, a full set of record types will be developed to support all existing record types, a set of process control functions for closed loop control, and support for experimental beam line control. A tool to configure these records will be developed. A communication protocol will be developed or extensions will be made to Channel Access to support introspection of components of a device. Performance bench marks will be made on both communication protocol and the database. After these records and performance tests are under way, a second of the grammar will be undertaken.

  20. LIMB Demonstration Project Extension

    SciTech Connect (OSTI)

    Not Available

    1990-09-21

    The DOE LIMB Demonstration Project Extension is a continuation of the EPA Limestone Injection Multistage Burner (LIMB) Demonstration. EPA ultimately expects to show that LIMB is a low cost control technology capable of producing moderate SO{sub x} and NO{sub x} control (50--60 percent) with applicability for retrofit to the major portion of the existing coal-fired boiler population. The current EPA Wall-Fired LIMB Demonstration is a four-year project that includes design and installation of a LIMB system at the 105-MW Unit 4 boiler at Ohio Edison's Edgewater Station in Lorain, Ohio. LIMB Extension testing continued during the quarter with lignosulfonated hydrated lime, pulverized limestone, and hydrated dolomitic lime while firing 1.8% and 3% sulfur coals. Sulfur dioxide removal efficiencies were equivalent to the results found during EPA, base LIMB testing. Sulfur dioxide removal efficiencies were lower than expected while testing with pulverized limestone without humidification. A slight increase in sulfur capture was noted while injecting pulverized limestone at the 187' elevation and with the humidifier outlet temperature at 145{degree}F.

  1. Hot Springs Point Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Point Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Hot Springs Point Geothermal Project Project Location Information...

  2. The Methanol Economy Project

    SciTech Connect (OSTI)

    Olah, George; Prakash, G.K.

    2013-12-31

    The Methanol Economy Project is based on the concept of replacing fossil fuels with methanol generated either from renewable resources or abundant natural (shale) gas. The full methanol cycle was investigated in this project, from production of methanol through bromination of methane, bireforming of methane to syngas, CO{sub 2} capture using supported amines, co-electrolysis of CO{sub 2} and water to formate and syngas, decomposition of formate to CO{sub 2} and H{sub 2}, and use of formic acid in a direct formic acid fuel cell. Each of these projects achieved milestones and provided new insights into their respective fields. ? Direct electrophilic bromination of methane to methyl bromide followed by hydrolysis to yield methanol was investigated on a wide variety of catalyst systems, but hydrolysis proved impractical for large-scale industrial application. ? Bireforming the correct ratio of methane, CO{sub 2}, and water on a NiO / MgO catalyst yielded the right proportion of H{sub 2}:CO (2:1) and proved to be stable for at least 250 hours of operation at 400 psi (28 atm). ? CO{sub 2} capture utilizing supported polyethyleneimines yielded a system capable of adsorbing CO{sub 2} from the air and release at nominal temperatures with negligible amine leaching. ? CO{sub 2} electrolysis to formate and syngas showed considerable increases in rate and selectivity by performing the reaction in a high pressure flow electrolyzer. ? Formic acid was shown to decompose selectively to CO{sub 2} and H{sub 2} using either Ru or Ir based homogeneous catalysts. ? Direct formic acid fuel cells were also investigated and showed higher than 40% voltage efficiency using reduced loadings of precious metals. A technoeconomic analysis was conducted to assess the viability of taking each of these processes to the industrial scale by applying the data gathered during the experiments to approximations based on currently used industrial processes. Several of these processes show significant promise for industrial scale up and use towards improving our nation’s energy independence.

  3. Clean Fuel Advanced Technology Awarded Projects Organization Project Descriptions

    E-Print Network [OSTI]

    COSTSHARE TOTAL COST (includes costshare) Nox (kg/yr) VOC (kg/yr) CO (kg/yr) PM (kg/yr) 2006 CFAT Projects(7 Energy Alternatives, LLC Biodiesel refueling infrastructure1,3 $150,000 $147,520 $297,520 -496 385 900,004 $1,097,397 3143 -285 25900 147 2009 CFAT Project(1 project) North Carolina Solar Center 1

  4. Developing Government Renewable Energy Projects

    SciTech Connect (OSTI)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  5. BPA, Transmission, I-5 Corridor Reinforcement Project, Project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 2011 Moving forward: From route "segments" to "alternatives" As we develop the draft environmental impact statement for this project, we have defined four route alternatives by...

  6. Project Reports for Nez Perce Tribe- 2011 Project

    Broader source: Energy.gov [DOE]

    The project will implement energy efficiency measures that include updates of several different elements in key Nez Perce tribal buildings in the town of Lapwai, Idaho.

  7. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    ..............................................................................................................................1 1.2.1 DOE-approved project documents:..............................................................................................1 1.2.2 DOE certified institutional systems or plans.......................................................................................................4 DOE Level I Milestones

  8. Project Reports for Native Village of Unalakleet- 2011 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Native Village of Unalakleet (NVU) project is a feasibility study for a retrofit of a tribally owned three-story 14-apartment complex, located in Unalakleet, Alaska.

  9. Project Reports for Peoria Tribe: Housing Authority- 2010 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Housing Authority of the Peoria Tribe of Indians of Oklahoma (Peoria Housing Authority or PHA) will conduct the "PHA Weatherization Training Project."

  10. Project Reports for Oneida Seven Generations Corp.- 2012 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The primary goal of the Oneida Energy project is to achieve the environmental and economic benefits of using waste as a fuel for energy conversion.

  11. PROJECT MANGEMENT PLAN EXAMPLES Deactivation Plan Project Scope...

    Energy Savers [EERE]

    Stabilization and Deactivation Project scope. Environmental remediation of cribs, ponds, and ditches will be conducted as follow-on work consistent with the goal of the...

  12. Project Reports for Pascua Yaqui Tribe- 2012 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Pascua Yaqui Tribe (PYT) Renewable Energy Development and Deployment Feasibility Study will determine the technical and economic viability of future renewable projects.

  13. Project Reports for Lower Sioux Indian Community- 2010 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    Lower Sioux intends to continue its efforts to develop wind projects on its lands as a continuation of efforts begun roughly 20 years ago.

  14. Project Reports for Gila River Indian Community- 2012 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Gila River Indian Community (GRIC) will conduct feasibility studies of potential renewable energy projects on its lands in south central Arizona.

  15. Altered Development of Visual Subcortical Projections Following

    E-Print Network [OSTI]

    Finlay, Barbara L.

    Altered Development of Visual Subcortical Projections Following Neonatal Thalamic Ablation increases connectivity by stabilizing an exuberant develop- mental projection, we examined the normal projection zones and show progressive growth within these zones. At no time during development do projections

  16. The Biocatalytic Desulfurization Project

    SciTech Connect (OSTI)

    David Nunn; James Boltz; Philip M. DiGrazia; Larry Nace

    2006-03-03

    The material in this report summarizes the Diversa technical effort in development of a biocatalyst for the biodesulfurization of Petro Star diesel as well as an economic report of standalone and combined desulfurization options, prepared by Pelorus and Anvil, to support and inform the development of a commercially viable process. We will discuss goals of the projected as originally stated and their modification as guided by parallel efforts to evaluate commercialization economics and process parameters. We describe efforts to identify novel genes and hosts for the generation of an optimal biocatalyst, analysis of diesel fuels (untreated, chemically oxidized and hydrotreated) for organosulfur compound composition and directed evolution of enzymes central to the biodesulfurization pathway to optimize properties important for their use in a biocatalyst. Finally we will summarize the challenges and issues that are central to successful development of a viable biodesulfurization process.

  17. Popeye Project: ROV interfaces

    SciTech Connect (OSTI)

    Scates, C.R.; Hickok, D.D.; Hernandez, D.A.

    1997-04-01

    The Popeye Project in the Gulf of Mexico helped advance the technology and standardization of ROV interfaces for deepwater subsea production systems. Some of the many successful ROV operations during installation and completion were {open_quotes}first-of-it`s-kind{close_quotes} activities-enabled by many technical advances. The use and reliance upon ROV systems for support of deepwater drilling and installation operations significantly increased in the past 10 years. Shell Offshore Inc.`s (SOI) confidence in this increased capability was an important factor in many of the design decisions which characterized the innovative system. Technology advancements, which depended on effective ROV intervention, were implemented with no significant difficulties. These advancements, in particular the flying leads and seabed position methods, are available to the industry for other deepwater subsea systems. In addition, several Popeye ROV interfaces have helped advance the subsea standardization initiative; e.g., hot stabs, torque-tool end effectors, and paint color.

  18. Ribosomal Database Project II

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    The Ribosomal Database Project (RDP) provides ribosome related data and services to the scientific community, including online data analysis and aligned and annotated Bacterial small-subunit 16S rRNA sequences. As of March 2008, RDP Release 10 is available and currently (August 2009) contains 1,074,075 aligned 16S rRNA sequences. Data that can be downloaded include zipped GenBank and FASTA alignment files, a histogram (in Excel) of the number of RDP sequences spanning each base position, data in the Functional Gene Pipeline Repository, and various user submitted data. The RDP-II website also provides numerous analysis tools.[From the RDP-II home page at http://rdp.cme.msu.edu/index.jsp

  19. Breckinridge Project, initial effort

    SciTech Connect (OSTI)

    none,

    1982-01-01

    The project cogeneration plant supplies electric power, process steam and treated boiler feedwater for use by the project plants. The plant consists of multiple turbine generators and steam generators connected to a common main steam header. The major plant systems which are required to produce steam, electrical power and treated feedwater are discussed individually. The systems are: steam, steam generator, steam generator fuel, condensate and feedwater deaeration, condensate and blowdown collection, cooling water, boiler feedwater treatment, coal handling, ash handling (fly ash and bottom ash), electrical, and control system. The plant description is based on the Phase Zero design basis established for Plant 31 in July of 1980 and the steam/condensate balance as presented on Drawing 31-E-B-1. Updating of steam requirements as more refined process information becomes available has generated some changes in the steam balance. Boiler operation with these updated requirements is reflected on Drawing 31-D-B-1A. The major impact of updating has been that less 600 psig steam generated within the process units requires more extraction steam from the turbine generators to close the 600 psig steam balance. Since the 900 psig steam generation from the boilers was fixed at 1,200,000 lb/hr, the additional extraction steam required to close the 600 psig steam balance decreased the quantity of electrical power available from the turbine generators. In the next phase of engineering work, the production of 600 psig steam will be augmented by increasing convection bank steam generation in the Plant 3 fired heaters by 140,000 to 150,000 lb/hr. This modification will allow full rated power generation from the turbine generators.

  20. Rural Energy Conference Project

    SciTech Connect (OSTI)

    Dennis Witmer; Shannon Watson

    2008-12-31

    Alaska remains, even at the beginning of the 21st century, a place with many widely scattered, small, remote communities, well beyond the end of both the road system and the power grid. These communities have the highest energy costs of any place in the United States, despite the best efforts of the utilities that service them. This is due to the widespread dependence on diesel electric generators, which require small capital investments, but recent increases in crude oil prices have resulted in dramatic increases in the cost of power. In the enabling legislation for the Arctic Energy Office in 2001, specific inclusion was made for the study of ways of reducing the cost of electrical power in these remote communities. As part of this mandate, the University of Alaska has, in conjunction with the US Department of Energy, the Denali Commission and the Alaska Energy Authority, organized a series of rural energy conferences, held approximately every 18 months. The goal of these meeting was to bring together rural utility operators, rural community leaders, government agency representatives, equipment suppliers, and researchers from universities and national laboratories to discuss the current state of the art in rural power generation, to discuss current projects, including successes as well as near successes. Many of the conference presenters were from industry and not accustomed to writing technical papers, so the typical method of organizing a conference by requesting abstracts and publishing proceedings was not considered viable. Instead, the organizing committee solicited presentations from appropriate individuals, and requested that (if they were comfortable with computers) prepare Power point presentations that were collected and posted on the web. This has become a repository of many presentations, and may be the best single source of information about current projects in the state of Alaska.

  1. Independent Oversight Review, West Valley Demonstration Project...

    Office of Environmental Management (EM)

    Oversight Review, West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation -...

  2. Project Profile: Carbon Dioxide Shuttling Thermochemical Storage...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Profile: Carbon Dioxide Shuttling Thermochemical Storage Using Strontium Carbonate Project Profile: Carbon Dioxide Shuttling Thermochemical Storage Using Strontium...

  3. U. S. Department of Energy project book

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    This book covers representative projects in each program within the Department of Energy. The projects included were selected to provide an insight into the wide spectrum of projects authorized and under way in the Department. The projects described do not cover all projects authorized - they are merely representative. Descriptions, goals, and status are given for 29 energy projects, 4 scientific projects, and 5 defense projects. (RWR)

  4. General Services Administration Photovoltaics Project in Sacramento...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    General Services Administration Photovoltaics Project in Sacramento, California General Services Administration Photovoltaics Project in Sacramento, California Document describes a...

  5. Project Profile: Thermochemical Storage with Anhydrous Ammonia...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Profile: Thermochemical Storage with Anhydrous Ammonia: Optimizing the Synthesis Reactor for Direct Production of Supercritical Steam Project Profile: Thermochemical...

  6. Miamisburg Environmental Management Project Archived Soil & Groundwate...

    Office of Environmental Management (EM)

    Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports...

  7. Fernald Environmental Management Project Archived Soil & Groundwater...

    Office of Environmental Management (EM)

    Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald...

  8. Regulatory Considerations for Developing Generation Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generation Projects on Federal Lands Regulatory Considerations for Developing Generation Projects on Federal Lands Presentation covers regulatory considerations for developing...

  9. Leveraging Resources for Weatherization Innovation Pilot Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Weatherization Innovation Pilot Projects (WIPP) Presentation Leveraging Resources for Weatherization Innovation Pilot Projects (WIPP) Presentation As a WIPP agency, reporting...

  10. Independent Oversight Review, West Valley Demonstration Project...

    Office of Environmental Management (EM)

    West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000...

  11. Project Management Career Development Program | Department of...

    Office of Environmental Management (EM)

    You are here Home Operational Management Certifications and Professional Development Project Management Career Development Program Project Management Career Development...

  12. Legacy of a Bomb: The Manhattan Project’s Impact on the Scientific Community

    E-Print Network [OSTI]

    Gao, Jany Huan

    2009-01-01

    TECH SPRING WAR TECH The Manhattan Project’s Impact on thewar and science: the Manhattan Project. This oper- andfor defense ever, the Manhattan Project’s legacy does and

  13. FY 2015 SENIOR EXECUTIVE SERVICE (SES) AND SENIOR PROFESSIONAL (SP)

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLforLDRD Report to Congress MoreHyd rog en Tan41FYFY 2014,byFY 2015

  14. FY 2015 Senior Executive Service (SES) and Senior Professional (SP)

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLforLDRD Report to Congress MoreHyd rog en Tan41FYFY 2014,byFY

  15. FY 2016 SENIOR EXECUTIVE SERVICE (SES) AND SENIOR PROFESSIONAL (SP)

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLforLDRD Report to Congress MoreHyd rog en Tan41FYFYPERFORMANCE APPRAISAL

  16. FY 2014 Senior Executive Service (SES) and Senior Professional (SP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order14, 20111,FY 2007 FeeFederal RealinSESPerformance

  17. The National Conversion Pilot Project

    SciTech Connect (OSTI)

    Roberts, A.V.

    1995-12-31

    The National Conversion Pilot Project (NCPP) is a recycling project under way at the U.S. Department of Energy (DOE) Rocky Flats Environmental Technology Site (RFETS) in Colorado. The recycling aim of the project is threefold: to reuse existing nuclear weapon component production facilities for the production of commercially marketable products, to reuse existing material (uranium, beryllium, and radioactively contaminated scrap metals) for the production of these products, and to reemploy former Rocky Flats workers in this process.

  18. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden D I E G O F E R N A N D O B O T E R O A R I S T I Z Á B A L An E-Reading Platform Business Plan The Leaf Project KTH Information and Communication Technology #12;i The Leaf Project An E-Reading Platform Business Plan Diego

  19. Silver Peak Innovative Exploration Project

    Broader source: Energy.gov [DOE]

    DOE Geothermal Peer Review 2010 - Presentation. Project objectives: Reduce the high level of risk during the early stages of geothermal project development by conducting a multi-faceted and innovative exploration and drilling program at Silver Peak. Determine the combination of techniques that are most useful and cost-effective in identifying the geothermal resource through a detailed, post-project evaluation of the exploration and drilling program.

  20. Project Funding Catalog of Services

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool FitsProject Develops Student-Stakeholders Project DevelopsProject Funding Catalog of

  1. Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |Project Management Project ManagementProject

  2. Implementing Fast Hierarchical Back Projection Jason Chang

    E-Print Network [OSTI]

    Willsky, Alan S.

    Implementing Fast Hierarchical Back Projection Jason Chang ECE 558 ­ Final Project Paper May 9, 2007 #12;Implementing Fast Hierarchical Back Projection Chang ii Abstract ­ Filtered back projection implemented in this project, called fast hierarchical back projection (FHBP), was proposed in [1] as a fast

  3. Projection screen having reduced ambient light scattering

    DOE Patents [OSTI]

    Sweatt, William C. (Albuquerque, NM)

    2010-05-11

    An apparatus and method for improving the contrast between incident projected light and ambient light reflected from a projection screen are described. The efficiency of the projection screen for reflection of the projected light remains high, while permitting the projection screen to be utilized in a brightly lighted room. Light power requirements from the projection system utilized may be reduced.

  4. HLW System Integrated Project Team

    Office of Environmental Management (EM)

    Team Integrated Project Team Steve Schneider Steve Schneider Office of Engineering and Technology High Level Waste Corporate Board March 5, 2009 This document is intended for...

  5. Research Projects | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Projects Nuclear Computational Low Energy Initiative (NUCLEI) Kinetic Theory of Turbulent Multiphase Flow Chemical Analysis of Nanodomains Chemical Physics Homogeneous and...

  6. Portsmouth/Paducah Project Office

    Office of Environmental Management (EM)

    1. Letter from W. Murphie to M. Galanti, "Record of Decision for the Site-wide Waste Disposition Evaluation Project at the Portsmouth Gaseous Diffusion Plant (DOEPPPO03...

  7. CCS Project Permit Acquisition Protocols

    SciTech Connect (OSTI)

    Lee, Si-Yong; Zaluski, Wade; Matthews, Vince; McPherson, Brian

    2013-06-30

    Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the “Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region” (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

  8. Software Defined Networking (SDN) Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Networking (SDN) Project Energy sector-focused SDN flow controller to manage control system networks centrally and securely Background Traditional information technology (IT)...

  9. Nez Perce Tribe- 2011 Project

    Broader source: Energy.gov [DOE]

    The project will implement energy efficiency measures that include updates of several different elements in key Nez Perce tribal buildings in the town of Lapwai, Idaho.

  10. TSSWCB Bacteria-Related Projects 

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01

    stream_source_info TSSWCB bacteria-related projects.pdf.txt stream_content_type text/plain stream_size 2550 Content-Encoding ISO-8859-1 stream_name TSSWCB bacteria-related projects.pdf.txt Content-Type text/plain; charset=ISO-8859... of the projects are listed below. ? Peach CreekWater Quality Improvement Project ? Monitoring and Educational Programs Focused on Bacteria and Nutrient Runoff on Dairy Operations in the LeonWatershed ? Development of the Plum CreekWPP ? Impact of Proper...

  11. Texas 4-H Beef Project 

    E-Print Network [OSTI]

    Texas 4-H Beef Project Team

    2000-07-27

    This tri-fold brochure explains the opportunities in 4-H beef projects, the membership requirements, potential costs, goals and objectives, volunteer leader opportunities, and career development possibilities....

  12. Project Funding | Department of Energy

    Office of Environmental Management (EM)

    Contracts ESPC ENABLE Process Utility Energy Service Contracts On-Site Renewable Power Purchase Agreements Energy Incentive Programs. Read the FEMP project funding quick...

  13. Nuclear Power Plant Design Project

    E-Print Network [OSTI]

    Nuclear Power Plant Design Project A Response to the Environmental and Economic Challenge Of Global) .................................................................... 14 4.4 High Temperature Gas Reactor

  14. SBSP Commercial Upstream Incentive Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SBSP Commercial Upstream Incentive Project 2014 Building Technologies Office Peer Review Todd Levin, tlevin@anl.gov, Cathy Milostan, cmilostan@anl.gov Argonne National Laboratory...

  15. ORISE: Applied health physics projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Applied health physics projects The Oak Ridge Institute for Science and Education (ORISE) provides applied health physics services to government agencies needing technical support...

  16. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  17. ARM Observations Projected onto CCSM Results Projected onto

    E-Print Network [OSTI]

    Mills, Richard

    ARM Observations Projected onto ARM States CCSM Results Projected onto ARM States 1Oak Ridge to Comparing Atmospheric Radiation Measurement (ARM) Data with Global Climate Model (GCM) Results Atmospheric state contained only in model results Atmospheric states contained only in ARM observations ARM

  18. Project Reports for Lummi Indian Business Council- 2010 Project

    Broader source: Energy.gov [DOE]

    The overall goal of the Lummi Indian Reservation Wind Energy Development Feasibility Assessment project is to conduct an assessment that will provide the information needed for the Lummi Indian Business Council (LIBC) to make a knowledge-based determination whether a wind-generation project on the reservation would provide enough economic, environmental, cultural, and social benefits to justify the cost of the development.

  19. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    _____________________________ Manager, SC-PSO _____________________________ J. Makiel NSTX Upgrade Project Federal Project Director, SC-PSO Description of Changes A 1/11/10 PPEP Initial Issue by PPPL & PSO, but not approved by OFES B 4/5/10 PPEP Cost

  20. Project Management Plan Project Title: Natural Resources Management

    E-Print Network [OSTI]

    US Army Corps of Engineers

    DEFINITION. The NRM Gateway is a knowledge management resource, designed to serve the needs of the NRMP; · Preserve institutional knowledge; · Develop practical and agency-approved webpages that provide usefulProject Management Plan Project Title: Natural Resources Management (NRM) Gateway Website

  1. Project design criteria manual: Upper Mechanicville Hydroelectric Redevelopment Project

    SciTech Connect (OSTI)

    None

    1980-12-01

    The design criteria presented in this manual are to be used as the bases for the detailed design for the Upper Mechanicville (NY) Hydroelectric Redevelopment Project. The manual refers to codes and standards which are to be used in the design of the project. Design approaches not covered by existing codes and standards are also given for all phases of the project. The manual is divided into six sections: civil design, hydraulic design, geotechnical design, electrical systems, mechanical systems, and major equipment. These design criteria are to be used as a guide for design. When changes become necessary, these shall be documented by the engineer responsible for the design. This documentation shall be sent to the Project Engineer and Project Manager for submission to the client for reference. The documentation shall specify the reason for the change and shall be routed to all Department Coordinators.

  2. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect (OSTI)

    Burritt, James G.; Berkey, Edgar

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  3. Zoe G. Cardon Senior Scientist

    E-Print Network [OSTI]

    Vallino, Joseph J.

    State University, 1988; College of Science valedictorian; graduation Magna Cum Laude. Professional, Rockwell F, Zwieniecki M, Holbrook NM. (2014) Modeled hydraulic redistribution by sunflower (Helianthus

  4. Provost and Senior Vice President

    E-Print Network [OSTI]

    PerformingArts College of Health Professions Schoolof Nursing Schoolof Health Sciences -Medical Laboratory & Reporting Standards Vice President for Student Affairs Office of Adult Learners Division of Student Affairs

  5. Senior Mechanical Engineer Company Description

    E-Print Network [OSTI]

    Kostic, Milivoje M.

    for manufacturability and familiarity with six-sigma tools preferred. · Strong analytical and problem solving skills-on experience developing and launching electro-mechanical products, preferable in military or automotive

  6. Xiaoguang Zhang Senior Research Staff

    E-Print Network [OSTI]

    Pennycook, Steve

    Beijing University, Beijing, China Physics B.S.,1983 Northwestern University, Evanston, Illinois Physics. Electron tunneling in epitaxial magnetic tunnel junctions, APS March meeting, New Orleans, 2008. 4 of Disordered Alloy Surfaces. Physical Review B, 1986. 34(8): p. 5169-5176. 2. Gonis, A., et al

  7. Solar Thermal Demonstration Project

    SciTech Connect (OSTI)

    Biesinger, K.; Cuppett, D.; Dyer, D.

    2012-01-30

    HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with â??Kalwallâ?? building panels. An added feature of the â??Kalwallâ? system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

  8. Coastal Ohio Wind Project

    SciTech Connect (OSTI)

    Gorsevski, Peter; Afjeh, Abdollah; Jamali, Mohsin; Bingman, Verner

    2014-04-04

    The Coastal Ohio Wind Project intends to address problems that impede deployment of wind turbines in the coastal and offshore regions of Northern Ohio. The project evaluates different wind turbine designs and the potential impact of offshore turbines on migratory and resident birds by developing multidisciplinary research, which involves wildlife biology, electrical and mechanical engineering, and geospatial science. Firstly, the project conducts cost and performance studies of two- and three-blade wind turbines using a turbine design suited for the Great Lakes. The numerical studies comprised an analysis and evaluation of the annual energy production of two- and three-blade wind turbines to determine the levelized cost of energy. This task also involved wind tunnel studies of model wind turbines to quantify the wake flow field of upwind and downwind wind turbine-tower arrangements. The experimental work included a study of a scaled model of an offshore wind turbine platform in a water tunnel. The levelized cost of energy work consisted of the development and application of a cost model to predict the cost of energy produced by a wind turbine system placed offshore. The analysis found that a floating two-blade wind turbine presents the most cost effective alternative for the Great Lakes. The load effects studies showed that the two-blade wind turbine model experiences less torque under all IEC Standard design load cases considered. Other load effects did not show this trend and depending on the design load cases, the two-bladed wind turbine showed higher or lower load effects. The experimental studies of the wake were conducted using smoke flow visualization and hot wire anemometry. Flow visualization studies showed that in the downwind turbine configuration the wake flow was insensitive to the presence of the blade and was very similar to that of the tower alone. On the other hand, in the upwind turbine configuration, increasing the rotor blade angle of attack reduced the wake size and enhanced the vortices in the flow downstream of the turbine-tower compared with the tower alone case. Mean and rms velocity distributions from hot wire anemometer data confirmed that in a downwind configuration, the wake of the tower dominates the flow, thus the flow fields of a tower alone and tower-turbine combinations are nearly the same. For the upwind configuration, the mean velocity shows a narrowing of the wake compared with the tower alone case. The downwind configuration wake persisted longer than that of an upwind configuration; however, it was not possible to quantify this difference because of the size limitation of the wind tunnel downstream of the test section. The water tunnel studies demonstrated that the scale model studies could be used to adequately produce accurate motions to model the motions of a wind turbine platform subject to large waves. It was found that the important factors that affect the platform is whether the platform is submerged or surface piercing. In the former, the loads on the platform will be relatively reduced whereas in the latter case, the structure pierces the wave free surface and gains stiffness and stability. The other important element that affects the movement of the platform is depth of the sea in which the wind turbine will be installed. Furthermore, the wildlife biology component evaluated migratory patterns by different monitoring systems consisting of marine radar, thermal IR camera and acoustic recorders. The types of radar used in the project are weather surveillance radar and marine radar. The weather surveillance radar (1988 Doppler), also known as Next Generation Radar (NEXRAD), provides a network of weather stations in the US. Data generated from this network were used to understand general migratory patterns, migratory stopover habitats, and other patterns caused by the effects of weather conditions. At a local scale our marine radar was used to complement the datasets from NEXRAD and to collect additional monitoring parameters such as passage rates, flight paths, flight directi

  9. Final Project Report

    SciTech Connect (OSTI)

    Zhang, Jin; Zhao, Yiping

    2014-12-05

    In this entire project period from 2005-2014, we have made significant progress in developing novel nanostructures of metal oxides (MOs) for solar hydrogen generation based on photoelectrochemical (PEC). Materials investigated are focused on 1D and 0D MO nanostructures of TiO2, WO3, ZnO, and Fe2O3 in conjunction with quantum dot (QD) sensitization and chemical doping (N or H) to alter their electronic band structures for both visible light absorption and for facilitating interfacial charge transport. In addition, we have used plasmonic metal nanostructures to enhance the PEC performance by improving light absorption of QDs via enhanced scattering of the plamonic metal. Most importantly, we have discovered a multipronged strategy for improving PEC performance: using plasmonic metal nanostructure to enhance light absorption, QDs to improve charge transfer, and chemical doping to increase charge transport in metal oxides for PEC. The combination is critical for overall high efficiency of PEC. This strategy is developed and demonstrated for the first time to our best knowledge.

  10. LIMB Demonstration Project Extension

    SciTech Connect (OSTI)

    Not Available

    1991-09-15

    The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (1) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems; (2) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit; and (3) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater. The demonstration project consists of several distinct phases: a preliminary phase to develop the LIMB process design applicable to the host boiler, a construction and start-up phase, and an operating and evaluation phase. The first major activity, the development of the Edgewater LIMB design, was completed in January 1986 and detailed engineering is now complete. Major boiler-related components were installed during a September 1986 boiler outage. Start-up activities began in March of 1987 with tuning of the low NO{sub x} burners. Sorbent injection activities were underway as of July 1987. 3 figs.

  11. RESEARCH PROJECTS A Basic research

    E-Print Network [OSTI]

    25 7 RESEARCH PROJECTS A Basic research SOFT SENSOR METHODS TO IMPROVE COMPETENCE OF INDUSTRIAL, Oulu University Duration of the project: 2000-2004 The aim is to improve the competence of industrial. #12;26 B Energy and process automation INTERACTION BETWEEN WOOD AND DEFIBRATION MEDIA IN GRINDING

  12. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems First level, 15.0 HEC Stockholm, Sweden A B D E L A H M I D into many devices. The goal of this thesis project is to build upon this trend toward "The internet describes different techniques and approaches toward developing this sensor. The thesis also evaluates

  13. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden R U S L A N M U K when dealing with this very large amount of data (often called "big data"). This thesis projectSQL). This comparison considers both a single node and a multi node cluster. The comparison evaluates several critical

  14. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden L U C I A N O R U's Live Smooth Streaming, have recently become very popular. This master's thesis project developed and evaluated several media rate adaptation algorithms optimized for mobile networks with a client running

  15. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden Y O U B E I J I N's thesis project concerns Sharplet, a spaced repetition system based web service, who is trying to stand the design, implementation, and evaluation of a new service that includes both audio and video content

  16. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden A R U N A R U M U contents ­ such as video or animations. The goal of this thesis project is remove the problem a web- browser based GUI. The prototype that will be designed, implemented, and evaluated will implement

  17. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden P E T E R S K O G, but also via third-party data sources. This report regards how mobile software is evaluated and rated of several relevant statistical methods and data mining techniques. The main object of this thesis project

  18. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden PAV E L L E G O N. In this master's thesis IEEE 802.11n technology was evaluated to assess its suitability for backhaul from a small secure small cells into a mobile network was developed. The results obtained during the project

  19. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden M U H A M M A D I several industrial actors are evaluating alternatives to CAN. Ethernet is one of the potential candidates possible extent. The purpose of this thesis project is to investigate the possibility of replacing the CAN

  20. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden N I YA Z A D I G O network resources. This master's thesis project proposes to multiplex RTP and data packets at the user and cost metrics are used to evaluate different potential demultiplexing points, and then the best possible

  1. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    . The objective of the project is to evaluate and analyse the need for value added services in India. The reportDegree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden N A R AYA N A N

  2. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden E R I K E L D H approach for computing as a whole. This thesis project explores these two technologies in order to create such a solution could be realized and utilized. The thesis evaluates current cloud providers in terms

  3. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden F E R N A N D O VA seamless handover between Wi-Fi APs and between cellular/Wi-Fi networks. During this thesis project interworking. Finally, a custom-designed simulator has been used to evaluate the proposed solution. Keywords

  4. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    project is to analyze and evaluate the level of performance, from the network point of view, that canDegree project in Communication Systems Communication Systems, 30.0 HEC Stockholm, Sweden I S A A C test this approach in a real environment, a prior providers' survey was utilized to evaluate

  5. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden S A B R I N A D U protocols for Traffic Engineering: MPLS-TE and RSVP-TE. The goal of this thesis project is to optimize. This thesis proposes and evaluates a solution to this optimization problem in the specific context

  6. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden S A B R I N A A L's thesis project, to implement the ifoodbag web application in a cloud. To achieve this goal, we began for why these specific mechanisms were selected is given. The tests allowed the evaluation of how each

  7. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden D R A G A N C A B authorization architecture from the preceding seminal work performed in SENSEI project. SENSEI and SWoT share association of software agents, management, evaluation, and enforcement of access permissions for resources

  8. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    for instrumentation (PXI) modules. The main objective of this project is to evaluate how different PXI modules workDegree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden W I L LY W A N G Evaluating the use of PXI modules in tests of a radio base station KTH Information and Communication

  9. Climate change & street trees project

    E-Print Network [OSTI]

    Climate change & street trees project Social Research Report The social and cultural values Group as part of the Climate change and street trees project, funded by the Forestry Commission with changing socio-economics and/or demographics, but little evidence exists relating

  10. Project Title: Prisoner Counselling Effectiveness

    E-Print Network [OSTI]

    Hickman, Mark

    : Martin Visser, John George Academic Supervisor: Andrew Frost Project Reference Number: S112/PrisonersTrustProject Title: Prisoner Counselling Effectiveness Bachelor of Arts Internship Company/Organization: The Counselling Service for Prisoners Trust Intern Position Title: Methodology Evaluator Organisation Supervisor

  11. The Climate Impacts LINK Project

    E-Print Network [OSTI]

    Feigon, Brooke

    The Climate Impacts LINK Project The Climatic Research Unit, University of East Anglia Funded by the UK Department of the Environment, Transport and the Regions, Contract Ref EPG 1/1/68 The Climate Impacts LINK Project: Applying Results from the Hadley Centre's Climate Change Experiments for Climate

  12. Special Report Post-project

    E-Print Network [OSTI]

    Rudowsky, Ira

    128 Special Report Post-project appraisals pay Frank R. Gulliver li your company is like most, you- nal auditor with the British Petroleum Company He was a founding member of its post-project appraisal. The Rotterdam proj- ect's success taught top managers at BP a valuable lesson: the planners needed to improve

  13. Southern Region Watershed Management Project

    E-Print Network [OSTI]

    and technology transfer programs. #12;Southern Region Watershed Management Project September 15, 2000 and networking both internally and with other regional water resources management programs, promoted technology1 Southern Region Watershed Management Project September 15, 2000 to September 14, 2005 Terminal

  14. LEED CI 2009 Project Scorecard

    E-Print Network [OSTI]

    Slatton, Clint

    LEED CI 2009 Project Scorecard Project Name: Last UpDate: Yes ? No 19 0 2 SUSTAINABLE SITES 21 1.4 MR5 1 UF None 1 Credit 1.5 MR4 UF None 1 Credit 2 LEED® Accredited Professional 1 UF None Yes

  15. US ITER Project Brad Nelson

    E-Print Network [OSTI]

    US ITER Project Progress Brad Nelson Chief Engineer, US ITER Project Office Fusion Energy Sciences beam injector test facility in Padova, Italy ELISE ion source at IPP, Garching, Germany Extraction grid/Nelson 22 Delivered Partial Production Completion of Production Full Production · Central Solenoid

  16. Why Good Projects Go Bad: Managing Development Projects near Tipping Points Tim Taylor and David Ford

    E-Print Network [OSTI]

    Ford, David N.

    Why Good Projects Go Bad: Managing Development Projects near Tipping Points Tim Taylor and David: The evolution of three projects near the project tipping point. The initial scope was 100 work packages. Degrading project: FRW = 0.8 RES = 3 Improving project: FRW = 0.1 RES = 0.25 Stagnate project: FRW = 0.5 RES

  17. The Lake Charles CCS Project

    SciTech Connect (OSTI)

    Doug Cathro

    2010-06-30

    The Lake Charles CCS Project is a large-scale industrial carbon capture and sequestration (CCS) project which will demonstrate advanced technologies that capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically the Lake Charles CCS Project will accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petroleum coke to chemicals plant (the LCC Gasification Project) and the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Lake Charles CCS Project will promote the expansion of EOR in Texas and Louisiana and supply greater energy security by expanding domestic energy supplies. The capture, compression, pipeline, injection, and monitoring infrastructure will continue to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project are expected to be fulfilled by working through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 includes the studies attached hereto that will establish: the engineering design basis for the capture, compression and transportation of CO{sub 2} from the LCC Gasification Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Hastings oil field in Texas. The overall objective of Phase 2, provided a successful competitive down-selection, is to execute design, construction and operations of three capital projects: (1) the CO{sub 2} capture and compression equipment, (2) a Connector Pipeline from the LLC Gasification Project to the Green Pipeline owned by Denbury and an affiliate of Denbury, and (3) a comprehensive MVA system at the Hastings oil field.

  18. Final Project Report

    SciTech Connect (OSTI)

    Carrick M. Eggleston

    2003-12-12

    This report provides a description of the main accomplishments of the EMSP funded research, including products such as conference presentations and publications (including those still in preparation). The purpose of this study was to better understand the chemical interactions between dissolved aqueous contaminants and carbonate minerals occurring as coatings on mineral grains in the vadose zone beneath the Hanford reserve. This information is important for construction of improved reactive transport models intended to predict the subsurface migration of contaminants. We made improvements to the hydrothermal atomic force microscope (HAFM) design to be used in this project. The original HAFM was built with funding from the U.S. DOE, Office of Basic Energy Sciences. Improvements include operating limits of 70 bars and 170 C, from an original limit of 12 bars and 150 C. This product is patented. We completed a series of studies of magnesite, MgCO3, because this mineral is structurally equivalent to calcite but reacts much more slowly, allowing us to study carbonate reactivity under pH conditions (i.e., low pH) that are much more problematic for studies of calcite but which are nevertheless relevant to in-situ conditions. We found that dissolving magnesite exhibits a dramatic change in step orientation, and therefore etch pit shape, as pH is lowered through 4.2 to 3 and 2. This change in step orientation is NOT accompanied by an increase in step velocity with decreasing pH. We also found that, after growing magnesite on a magnesite substrate, the newly grown magnesite dissolved much more readily than the underlying substrate magnesite, and exhibited far larger etch pit densities. This effect may have been related to the rate of growth or to the presence of an Fe impurity in the growth solutions. We studied the dissolution of magnesite and calcite (104) surfaces under a wider variety of conditions with a new hydrodynamically defined hydro thermal AFM fluid cell, and we have observed the precipitation of a strontium-containing carbonate phase on dissolving calcite. We have applied the advection-diffusion equation coupled to proposed homogeneous and heterogeneous kinetic models to test rate laws for dissolution observed by HAFM. Our main conclusions in the magnesite studies are that step density, rather than step velocity, is a strong function of pH near the surface and that the step orientation is sensitive to pH. In these studies, we definitively demonstrate that diffusive mass transport is only important at very low fluid velocities for magnesite, but that studies of calcite dissolution are generally in the mixed transport-kinetics controlled regime (even at high fluid velocities) where quantitative information can only be obtained by accounting for the transport components. We also have found that alkaline earth carbonate secondary precipitate formation on calcite surfaces significantly alters the net flux o f Ca2+ and may passivate the CaCO3 surface from further reaction. The research has so far resulted in 5 conference presentations and 3 published journal articles, with several manuscripts still in preparation. The project supported graduate student Briana Deeds and postdoctoral researcher Steven R. Higgins.

  19. Detroit Commuter Hydrogen Project

    SciTech Connect (OSTI)

    Brooks, Jerry; Prebo, Brendan

    2010-07-31

    This project was undertaken to demonstrate the viability of using hydrogen as a fuel in an internal combustion engine vehicle for use as a part of a mass transit system. The advantages of hydrogen as a fuel include renew-ability, minimal environmental impact on air quality and the environment, and potential to reduce dependence on foreign energy sources for the transportation sector. Recognizing the potential for the hydrogen fuel concept, the Southeast Michigan Congress of Governments (SEMCOG) determined to consider it in the study of a proposed regional mass transit rail system for southeast Michigan. SEMCOG wanted to evaluate the feasibility of using hydrogen fueled internal combustion engine (H2ICE) vehicles in shuttle buses to connect the Detroit Metro Airport to a proposed, nearby rail station. Shuttle buses are in current use on the airport for passenger parking and inter-terminal transport. This duty cycle is well suited to the application of hydrogen fuel at this time because of the ability to re-fuel vehicles at a single nearby facility, overcoming the challenge of restricted fuel availability in the undeveloped hydrogen fuel infrastructure. A cooperative agreement between SEMCOG and the DOE was initiated and two H2ICE buses were placed in regular passenger service on March 29, 2009 and operated for six months in regular passenger service. The buses were developed and built by the Ford Motor Company. Wayne County Airport Authority provided the location for the demonstration with the airport transportation contractor, Metro Cars Inc. operating the buses. The buses were built on Ford E450 chassis and incorporated a modified a 6.8L V-10 engine with specially designed supercharger, fuel rails and injectors among other sophisticated control systems. Up to 30 kg of on-board gaseous hydrogen were stored in a modular six tank, 350 bar (5000 psi) system to provide a 150 mile driving range. The bus chassis and body were configured to carry nine passengers with luggage. By collecting fuel use data for the two H2ICE buses, with both written driver logs and onboard telemetry devices, and for two conventional propane-gasoline powered buses in the same service, comparisons of operating efficiency and maintenance requirements were completed. Public opinion about the concept of hydrogen fuel was sampled with a rider survey throughout the demonstration. The demonstration was very effective in adding to the understanding of the application of hydrogen as a transportation fuel. The two 9 passenger H2ICE buses accumulated nearly 50,000 miles and carried 14,285 passengers. Data indicated the H2ICE bus fuel economy to be 9.4 miles/ gallon of gasoline equivalent (m/GGE) compared to the 10 passenger propane-gasoline bus average of 9.8 m/GGE over 32,400 miles. The 23- passenger bus averaged 7.4 m/GGE over 40,700 miles. Rider feedback from 1050 on-board survey cards was overwhelmingly positive with 99.6% indicating they would ride again on a hydrogen powered vehicle. Minimal maintenance was required for theses buses during the demonstration project, but a longer duration demonstration would be required to more adequately assess this aspect of the concept.

  20. DIGITAL ARCHITECTURE PROJECT PLAN

    SciTech Connect (OSTI)

    Thomas, Ken

    2014-09-01

    The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: • There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. • There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. • There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new technologies.