Powered by Deep Web Technologies
Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Replacements Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

CRSP 2010 SUPER - - CRSP REPL SUPER PROJECT NFGCR CRSP 2011 SUPER 734,787.44 CRSP RPL SUPER PROJECT 2011 PHS C0006B 15,564.06 PHS - DSW COMM FOR OCI PHSTOW 0001B 73,885.26...

2

Conceptual Design Plan SM-43 Replacement Project  

SciTech Connect

The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

University of California, Los Alamos National Laboratory, SCC Project Office

2000-11-01T23:59:59.000Z

3

The LiveWire Project  

Science Conference Proceedings (OSTI)

Enova and Pacific Telesis planned field trials of a high-speed, hybrid fiber/coax two-way communication link to test how new products and services could be delivered to residential customers. Pacific Telesis' acquisition by SBC Communications ended the project before the trials began. This report discusses design and implementation of a system prototype built to serve one house.

1998-10-20T23:59:59.000Z

4

The LiveWire Project final report  

SciTech Connect

Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local area network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.

Brown, C.D.; Nelson, T.T. [Enova Technology, San Diego, CA (United States); Kelly, J.C.; Dominguez, H.A. [Paragon Consulting Services, La Verne, CA (United States)

1997-10-01T23:59:59.000Z

5

Milling Machine Replacement Project (4587), 5/11/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milling Machine Replacement Projects (4587) Milling Machine Replacement Projects (4587) Program or Field Office: Y-12 Site Office Location(s) (City/County/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: Submit by E-mail The proposed action is to replace two large milling machines with two new medium sized CNC milling machines. The new machines will be connected to the digital network communication (DNC) system. Categorical Exclusion(s) Applied: 81.31 -Installation or relocation of machinery and equipment For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation)

6

Duct Chase Sprinkler Replacement Project (4594), 5/31/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Duct Chase Sprinkler Replacement Project (4594) Duct Chase Sprinkler Replacement Project (4594) Program or Field Office: Y-12 Site Office Location(s) (Citv/County/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: The proposed action is provide replacement of corroded and aged sprinkler heads in the plenum duct chases. Categorical Exclusion(s) Applied: 81.3- Routine maintenance Submit by E-mail For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of I 0 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) [{Jrhe proposal fits within a class of actions that is listed in Appendix A orB to 10 CFR Part 1021, Subpart D.

7

Categorical Exclusion 4567, MPLE Test Stand Replacement Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

.Forn1 .Forn1 Project Title: MPLE Test Stand Replacement Project (4567) Oak Ridge Tennessee This work scope is upgrade and replace equipment with a new high-pressure leak testing capability. General AdministrationlManagement DA 1 - Routine business actions DA2 - Administrative contract amendments DA4 Interpretations/rulings for existing regulations DA5 - Regulatory interpretations without environmental effect DA6 Procedural rulemakings upgrade DA7 - Transfer of property, use unchanged DA8 - Award of technical supportlM&O/personal service contracts DA9 - Info gathering, analysis, documentation, dissemination, and training DA I 0 - Reports on non-DOE legislation DAII Technical advice and planning assistance construction/operation/decommissioning DA 12 -

8

Final Technical Report: The Water-to-Wire (W2W) Project  

SciTech Connect

The purpose of the Free Flow Power (FFP) Water-to-Wire Project (Project) was to evaluate and optimize the performance, environmental compatibility, and cost factors of FFP hydrokinetic turbines through design analyses and deployments in test flumes and riverine locations.

Lissner, Daniel N.; Edward, Lovelace C.

2013-12-24T23:59:59.000Z

9

The high wire balancing act of the IS project director  

Science Conference Proceedings (OSTI)

The implementation of a cross-functional enterprise system requires a more sustained and comprehensive change management program than does classical Information System (IS) application development. The tools and techniques used in such projects will ... Keywords: MIS development projects, case study, project directors, roles

Vital Roy; Carmen Bernier; Lucie Léveillé

2006-01-01T23:59:59.000Z

10

EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

11

Developing a total replacement cost index for suburban office projects  

E-Print Network (OSTI)

Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

Hansen, David John, S.M. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

12

Programmatic mission capabilities - chemistry and metallurgy research replacement (CMRR) project  

Science Conference Proceedings (OSTI)

CMRR will have analysis capabilities that support all the nuclear-material programs and national security needs. CMRR will replace the aging CMR Building and provide a key component responsive infrastructure necessary to sustain all nuclear programs and the nuclear-weapons complex. Material characterization capabilities - evaluate the microstructures and properties of nuclear materials and provide experimental data to validate process and performance models. Analytical chemistry capabilities - provide expertise in chemical and radiochemical analysis of materials where actinide elements make up a significant portion of the sample.

Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

2011-01-04T23:59:59.000Z

13

Final Environmental Assessment for the Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93 93 Final Environmental Assessment for the Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject U.S. Department of Energy National Nuclear Security Administration August 2007 Final Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject - August 2007 i TABLE OF CONTENTS List of Acronyms and Abbreviations............................................................................................. vi Chemicals and Units of Measure ................................................................................................. ix Conversion Chart ......................................................................................................................... xi Metric Prefixes .............................................................................................................................xii

14

The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Radioactive Liquid Waste Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory OAS-L-13-15 September 2013 Department of Energy Washington, DC 20585 September 26, 2013 MEMORANDUM FOR THE ASSOCIATE ADMINISTRATOR FOR ACQUISITION AND PROJECT MANAGEMENT MANAGER LOS ALAMOS FIELD OFFICE FROM: David Sedillo Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory" BACKGROUND The Department of Energy's Los Alamos National Laboratory (Los Alamos) is a Government- owned, contractor operated Laboratory that is part of the National Nuclear Security Administration's (NNSA) nuclear weapons complex. Los Alamos' primary responsibility is to

15

Dry Pipe Sprinkler Piping Replacement Project (4588), 4/30/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pipe System Sprinkler Piping Replacement Projects (4588) Pipe System Sprinkler Piping Replacement Projects (4588) Program or Field Office: Y-12 Site Office Location(s) (City/County/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: Submit by E-mail The proposed action is to replace sections of dry pipe system sprinkler piping which include heads, hangers, fittings, and valves. Categorical Exclusion(s) Applied: 81.3- Routine maintenance For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of I 0 CFR Part I 021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) [{Jrhe proposal fits within a class of actions that is listed in Appendix A orB to 10 CFR Part 1021, Subpart D.

16

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

17

Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects  

Science Conference Proceedings (OSTI)

This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

Richman, Eric E.

2009-11-04T23:59:59.000Z

18

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Mitigation Action Plan (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Burnt Woods and Santiam-Toledo Pole Replacement Project Burnt Woods and Santiam-Toledo Pole Replacement Project DOE/EA-1636 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115- kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kV transmission line in Linn, Benton and Lincoln counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. The purpose of this MAP is to explain how the mitigation measures will be

19

Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project  

Science Conference Proceedings (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

20

Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project  

Science Conference Proceedings (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project  

Science Conference Proceedings (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

22

Assessment of Nuclear Safety Culture at the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project, April 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Laboratory Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project May 2011 April 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Independent Oversight Assessment of Nuclear Safety Culture at the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project Table of Contents 1. Introduction ........................................................................................................................................... 1 2. Scope and Methodology ....................................................................................................................... 2

23

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albany-Burnt Woods and Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment DOE/EA-1636 March 2009 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment DOE/EA-1636 Bonneville Power Administration March 2009 Bonneville Power Administration i Table of Contents Chapter 1 Need for and Purpose of Action ............................................................... 1-1 1.1 Introduction .....................................................................................................

24

Rohm and Haas: Furnace Replacement Project Saves Energy and Improves Production at a Chemical Plant  

Science Conference Proceedings (OSTI)

This DOE Industrial Technologies Program spotlight describes how Rohm and Haas's Deer Park, Texas, chemical plant reduced natural gas usage and energy costs by replacing inefficient furnace equipment.

Not Available

2006-02-01T23:59:59.000Z

25

Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by Edinburg Irrigation District Hidalgo County No. 1 to the North American Development Bank (NADBank). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., 72" pipeline replacing a segment of delivery canal along the "Curry Main" and multi-size pipeline replacing a segment of delivery canal along the "North Branch / East Main"). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost of water savings and cost of energy savings for both components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $29.87 per ac-ft and energy savings are measured at an aggregate value of $0.0000595 per BTU (i.e., $0.203 per kwh). In addition, expected values are indicated for the Bureau of Reclamation's three principal evaluation measures specified in the United States Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $50.90 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0000777 per BTU ($0.265 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -2.01.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2002-11-01T23:59:59.000Z

26

Bayesian Belief Network (BBN)-based advisory system development for steam generator replacement project management  

E-Print Network (OSTI)

The growing need for improved project management technique points to the usefulness of a knowledge-base advisory system to help project managers understand current and future project status and optimize decisions based ...

Kim, Dohyoung, 1970-

2002-01-01T23:59:59.000Z

27

HPS replacement project drives garage costs down. [High-pressure sodium luminaires  

SciTech Connect

The high cost of energy had forced a four-story New York airport parking garage to turn off almost half its low bay lights, leaving it gloomy and vandal-prone. By replacing the original lamps with high-pressure sodium (HPS) luminaires, the garage brightened its image with 2400 fewer fixtures and netted an annual energy savings of $60,000.

Not Available

1985-09-01T23:59:59.000Z

28

DOE/EA-1636: Finding of No Significant Impact for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project EA (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1636 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Albany- Burnt Woods and Santiam-Toledo Pole Replacement Project. This project involves replacing wood pole structures on the existing Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and along a portion of the existing Santiam-Toledo single circuit, 230-kV transmission line. BPA has prepared an environmental assessment (DOE/EA-1636) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

29

Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93 93 Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject U.S. Department of Energy Oak Ridge Y-12 Site Office National Nuclear Security Administration August 2007 DOE/EA-1593 Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject U.S. Department of Energy National Nuclear Security Administration

30

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System  

DOE Green Energy (OSTI)

Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

Stephens, Jessica D.

2013-05-29T23:59:59.000Z

31

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System  

SciTech Connect

On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

Stephens, Jessica D.

2013-05-29T23:59:59.000Z

32

Project Plan 7930 Cell G PaR Remote Handling System Replacement  

Science Conference Proceedings (OSTI)

For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

Kinney, Kathryn A [ORNL

2009-10-01T23:59:59.000Z

33

Selection of ENRAF gauge wire material compatible with the Hanford waste tank environment  

Science Conference Proceedings (OSTI)

This document describes the selection of the wire material that will replace the 316 SS wire in the ENRAF level indicators.

Anantatmula, R.P.

1994-12-01T23:59:59.000Z

34

Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 54" Pipeline Replacing Main Canal – Preliminary  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Brownsville Irrigation District to the North American Development Bank (NADB) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 54" pipeline to replace 2.29 miles of the “Main Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated 49-year useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 1,844 ac-ft of water per year and 313,797,977 BTUs (91,969 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $24.70 per ac-ft. The calculated economic and financial cost of energy savings is estimated at $0.0001740 per BTU ($0.594 per kwh). In addition, expected real (rather than nominal) values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $56.74 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0003335 per BTU ($1.138 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -1.46.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2003-07-01T23:59:59.000Z

35

Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Brownsville Irrigation District to the North American Development Bank (NADB) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 48" pipeline to replace 2.31 miles of the “Main Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated 49-year useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 1,872 ac-ft of water per year and 318,479,103 BTUs (93,341 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $27.98 per ac-ft. The calculated economic and financial cost of energy savings is estimated at $0.0001933 per BTU ($0.660 per kwh). In addition, expected real (rather than nominal) values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $58.60 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0003444 per BTU ($1.175 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -1.53.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2003-10-01T23:59:59.000Z

36

Superconducting wire  

DOE Patents (OSTI)

This invention consists of a method of producing superconducting wire by drawing a glass fiber with a melted powder of a superconducting wire inside the glass tube. After drawing, the glass fiber is heated to crystallize the superconducting compound. The diameter of the superconducting wires is controlled by the rate at which the glass fiber s are drawn from the glass tube.

Day, D.E.; Petrovic, J.J.; Gac, F.D.; Ray, C.S.

1991-03-05T23:59:59.000Z

37

High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. Environmental Assessment  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE`s instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department`s obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act.

Not Available

1993-06-01T23:59:59.000Z

38

Wire chamber  

DOE Patents (OSTI)

A wire chamber or proportional counter device, such as Geiger-Mueller tube or drift chamber, improved with a gas mixture providing a stable drift velocity while eliminating wire aging caused by prior art gas mixtures. The new gas mixture is comprised of equal parts argon and ethane gas and having approximately 0.25% isopropyl alcohol vapor.

Atac, Muzaffer (Wheaton, IL)

1989-01-01T23:59:59.000Z

39

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Date: 12120/2010 DOE Coda: Contractor Coda: Project Lead: Marcus Bruckner Project Overview 1 Dig ditch from 24-51-8TX-1 0 to 24-AX-10 and remove and replace electrical wire {N 2.7o') 1. Brief project desalptlon Pnclude anything that oould impact the 2. 24-51-5TX-10 and 24-AX-10 (SW r.tN 10TOWNSHIP 38 NORTH RANGE 78WEST) environment] 2. Leg allocation 3. 1 day 3. Duration of the project 4. Major equipment to be used 4. Backhoe The table below is to be completed by the Project Leed and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and contact the Technical Assurance Department.

40

Final Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPENDIX A ENVIRONMENTAL IMPACTS METHODOLOGIES This appendix briefly describes the methods used to assess the potential direct, indirect, and cumulative effects of the alternatives in this Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory (CMRR EIS). Included are impact assessment methods for land use and visual resources, site infrastructure, air quality, noise, geology and soils, surface and groundwater, water quality, ecological resources, cultural and paleontological resources, socioeconomics, waste management and pollution prevention, and cumulative impacts. Each section includes descriptions of the affected resources, region of influence, and impact assessment methods. Descriptions of the

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Microsoft Word - CX-Fairview-Rogue_GroundWire_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2010 , 2010 REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum Harold Grappe Project Manager - TELP-TTP-3 Proposed Action: Replacement of overhead ground wire in the last and most southerly mile of the Fairview-Rogue #1 230-kV transmission line leading into the Rogue Substation PP&A Project No.: 1736 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment...routine maintenance activities, corrective...are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project is located in Curry County, Oregon, in the Alvey District. The project

42

Precision wire feeder for small diameter wire  

SciTech Connect

A device for feeding small diameter wire having a diameter less than 0.04 mm (16 mil) to a welding station includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut.

Brandon, Eldon D. (Albuquerque, NM); Hooper, Frederick M. (Albuquerque, NM); Reichenbach, Marvin L. (Albuquerque, NM)

1992-01-01T23:59:59.000Z

43

Precision wire feeder for small diameter wire  

DOE Patents (OSTI)

A device for feeding small diameter wire having a diameter less than 0.04 mm (16 mil) to a welding station includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut. 1 figure.

Brandon, E.D.; Hooper, F.M.; Reichenbach, M.L.

1992-08-11T23:59:59.000Z

44

Plant Process Computer Replacement to Support Distributed Process Control: Joint STPNOC-EPRI Distributed Plant Process Computer Syst em Project  

Science Conference Proceedings (OSTI)

Concerns exist that nuclear power plant process computer systems are becoming obsolete and do not have the infrastructure to support new processes such as digital process control upgrades. To address these concerns, a distributed plant process computer system was designed and implemented at the South Texas Project Nuclear Operating Company Units 1 and 2. Implementing this new system and its associated plant networks, if done correctly, will facilitate future control and information system upgrades that c...

2001-11-16T23:59:59.000Z

45

Superconducting wires  

SciTech Connect

The requirement of high critical current density has prompted extensive research on ceramic processing of high-T/sub c/ superconductors. An overview of wire fabrication techniques and the limitations they impose on component design will be presented. The effects of processing on microstructure and critical current density will also be discussed. Particle alignment has been observed in extruded samples which is attributed to high shear stresses during plastic forming. Composites of superconductor and silver in several configurations have been made with little deleterious effect on the superconducting properties. 35 refs., 2 figs., 1 tab.

Lanagan, M.T.; Poeppel, R.B.; Singh, J.P.; Dos Santos, D.I.; Lumpp, J.K.; Dusek, J.T.; Goretta, K.C.

1988-06-01T23:59:59.000Z

46

Draft Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

o o n c e p t u a l D r a w i n g of t h e C M R R F a c i l i t y Draft Environmental Impact Statement For the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico DOE/EIS-0350D May 2003 SUMMARY CMR Building TA-6 TA-55 U.S. Department of Energy National Nuclear Security Administration Los Alamos Site Office General questions regarding this EIS or for a copy of this EIS, please contact: AVAILABILITY OF THE DRAFT CMRR EIS Printed with soy ink on recycled paper Elizabeth Withers, EIS Document Manager U.S. Department of Energy Office of Los Alamos Site Operations 528 35th Street Los Alamos, New Mexico 87544-2201 Telephone: 1-877-491-4957 National Nuclear Security Administration iii COVER SHEET Responsible Agency: United States Department of Energy (DOE), National Nuclear Security

47

Improved Superconducting Wire for Wind Generators: Superconducting Wires for Direct-Drive Wind Generators  

SciTech Connect

REACT Project: Brookhaven National Laboratory will develop a low-cost superconducting wire that could be used in high-power wind generators. Superconducting wire currently transports 600 times more electric current than a similarly sized copper wire, but is significantly more expensive. Brookhaven National Laboratory will develop a high-performance superconducting wire that can handle significantly more electrical current, and will demonstrate an advanced manufacturing process that has the potential to yield a several-fold reduction in wire costs while using a using negligible amount of rare earth material. This design has the potential to make a wind turbine generator lighter, more powerful, and more efficient, particularly for offshore applications.

2012-01-01T23:59:59.000Z

48

Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Preliminary  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 2, (a.k.a. San Juan) to the North American Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 977 ac-ft of water per year and 372,892,700 BTUs (109,289 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $70.97 per ac-ft. The calculated economic and financial cost of energy savings is estimated at $0.0002124 per BTU ($0.725 per kwh). In addition, expected real (vs nominal) values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $75.29 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0001973 per BTU ($0.673 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -3.12.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2003-05-01T23:59:59.000Z

49

Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - 48" Pipeline Replacing Wisconsin Canal - Final  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 2, (a.k.a. San Juan) to the North American Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 977 ac-ft of water per year and 372,892,700 BTUs (109,289 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $70.97 per ac-ft. The calculated economic and financial cost of energy savings is estimated at $0.0002124 per BTU ($0.725 per kwh). In addition, expected real (vs nominal) values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $75.29 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0001973 per BTU ($0.673 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -3.12.

Rister, Edward; Lacewell, Ronald; Sturdivant, Allen; Robinson, John; Popp, Michael

2003-07-01T23:59:59.000Z

50

EIS-0350-S1: Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

This Supplemental EIS evaluates the completion of the Chemistry and Metallurgy Research Building Replacement (CMRR) Project, which consists of constructing the nuclear facility portion (CMRR-NF) at Los Alamos National Laboratory (LANL). The CMRR Project provides the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. Because of recent detailed site geotechnical investigations, certain aspects of the CMRR-NR project have changed resulting in change to the environmental impacts.

51

Precision wire feeder for small diameter wire  

DOE Patents (OSTI)

This invention is comprised of a device for feeding small diameter wire having a diameter less than .04 mm (16 mil) to a welding station which includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut. 1 fig.

Brandon, E.D.; Hooper, F.M.; Reichenbach, M.L.

1990-12-31T23:59:59.000Z

52

Lansce Wire Scanning Diagnostics Device Mechanical Design  

SciTech Connect

The Accelerator Operations & Technology Division at Los Alamos National Laboratory operates a linear particle accelerator which utilizes 110 wire scanning diagnostics devices to gain position and intensity information of the proton beam. In the upcoming LANSCE improvements, 51 of these wire scanners are to be replaced with a new design, up-to-date technology and off-the-shelf components. This document outlines the requirements for the mechanical design of the LANSCE wire scanner and presents the recently developed linac wire scanner prototype. Additionally, this document presents the design modifications that have been implemented into the fabrication and assembly of this first linac wire scanner prototype. Also, this document will present the design for the second, third, and fourth wire scanner prototypes being developed. Prototypes 2 and 3 belong to a different section of the particle accelerator and therefore have slightly different design specifications. Prototype 4 is a modification of a previously used wire scanner in our facility. Lastly, the paper concludes with a plan for future work on the wire scanner development.

Rodriguez Esparza, Sergio [Los Alamos National Laboratory; Batygin, Yuri K. [Los Alamos National Laboratory; Gilpatrick, John D. [Los Alamos National Laboratory; Gruchalla, Michael E. [Los Alamos National Laboratory; Maestas, Alfred J. [Los Alamos National Laboratory; Pillai, Chandra [Los Alamos National Laboratory; Raybun, Joseph L. [Los Alamos National Laboratory; Sattler, F. D. [Los Alamos National Laboratory; Sedillo, James Daniel [Los Alamos National Laboratory; Smith, Brian G. [Los Alamos National Laboratory

2011-01-01T23:59:59.000Z

53

DOE/EIS-0350-SA-01: Supplement Analysis for Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory, Los Alamos, NM (01/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SA-01 SA-01 Supplement Analysis Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory, Los Alamos, New Mexico Changes to the Location of the CMRR Facility Components January 2005 Department of Energy National Nuclear Security Administration Los Alamos Site Office Supplement Analysis Introduction This Supplement Analysis (SA) has been prepared to determine if the Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory (CMRR EIS) (DOE/EIS-0350) adequately addresses the environmental effects of proposed changes in the location of certain components of the Preferred Alternative that the National Nuclear Security

54

Precision Wire Forming  

SciTech Connect

An air-operated semiautomatic wire former was designed and built at Mound Laboratory to form specific types of electrodes to be molded in plastic parts. Use of the semiautomatic wire former eliminates the sliding action of tooling on the surface of the electrode wire to be formed and properly aligns the crimped electrode surfaces to within required tolerance ranges. These are difficulties which are characteristic of conventional wire forming tooling. Interchangeable tooling is provided with the semiautomatic wire former for forming electrode wires in one plane; secondary tooling was designed and bulit for forming electrode wires in two planes; and a special series of tooling was designed for forming more complex wire forms.

Weeks, J. E.; Osborne, J. M.

1970-08-07T23:59:59.000Z

55

Forrest County Geothermal Energy Project Geothermal Project ...  

Open Energy Info (EERE)

of replacing the existing air cooled chiller with geothermal water to water chillers for energy savings at the Forrest County Multi Purpose Center. The project will also replace...

56

Wire-inhomogeneity detector  

DOE Patents (OSTI)

A device for uncovering imperfections in electrical conducting wire, particularly superconducting wire, by detecting variations in eddy currents. Eddy currents effect the magnetic field in a gap of an inductor, contained in a modified commercial ferrite core, through which the wire being tested is passed. A small increase or decrease in the amount of conductive material, such as copper, in a fixed cross section of wire will unbalance a bridge used to measure the impedance of the inductor, tripping a detector and sounding an alarm.

Gibson, G.H.; Smits, R.G.; Eberhard, P.H.

1982-08-31T23:59:59.000Z

57

Wire Scanner Beam Profile Measurements for the LANSCE Facility  

SciTech Connect

The Los Alamos Neutron Science Center (LANSCE) is replacing beam profile measurement systems, commonly known as Wire Scanners (WS). Using the principal of secondary electron emission, the WS measurement system moves a wire or fiber across an impinging particle beam, sampling a projected transverse-beam distribution. Because existing WS actuators and electronic components are either no longer manufactured or home-built with antiquated parts, a new WS beam profile measurement is being designed, fabricated, and tested. The goals for these new WS's include using off-the-shelf components while eliminating antiquated components, providing quick operation while allowing for easy maintainability, and tolerating external radioactivation. The WS measurement system consists of beam line actuators, a cable plant, an electronics processor chassis, and software located both in the electronics chassis (National Instruments LabVIEW) and in the Central Control Room (EPICS-based client software). This WS measurement system will measure Hand H{sup +} LANSCE-facility beams and will also measure less common beams. This paper describes these WS measurement systems.

Gilpatrick, John D. [Los Alamos National Laboratory; Gruchalla, Michael E. [Los Alamos National Laboratory; Martinez, Derwin [Los Alamos National Laboratory; Pillai, Chandra [Los Alamos National Laboratory; Rodriguez Esparza, Sergio [Los Alamos National Laboratory; Sedillo, James Daniel [Los Alamos National Laboratory; Smith, Brian G. [Los Alamos National Laboratory

2012-05-15T23:59:59.000Z

58

Wire-driven Parallel Robot: Permitting Collisions Between Wires  

Science Conference Proceedings (OSTI)

In spatial designs of wire-driven parallel robots, collisions between wires by limiting platform trajectories. The common practice for avoiding collisions between wires is by limiting the moving platform trajectories. However, as opposed to rigid ... Keywords: cable robot, collision, tangling, wire robot, workspace

Yonatan Wischnitzer; Nir Shvalb; Moshe Shoham

2008-09-01T23:59:59.000Z

59

Alliant Energy (Wisconsin Power and Light)- Farm Wiring Grant Program  

Energy.gov (U.S. Department of Energy (DOE))

Alliant Energy (Wisconsin Power & Light) offers a Farm Wiring Grant program to increase farm safety, productivity and efficiency. The first $1,000 of the cost of the project is covered by a...

60

Low power interconnect design for fpgas with bidirectional wiring using nanocrystal floating gate devices (abstract only)  

Science Conference Proceedings (OSTI)

New architectures for the switch box and connection block are proposed for use in an energy efficient field programmable gate array (FPGA) with bidirectional wiring. Power-hungry SRAMs are replaced by non-volatile nanocrystal floating gate (NCFG) devices ... Keywords: bidirectional wiring, connection block, floating gate, fpga, high speed, low power, nanocrystal, switch box

Daniel Schinke; Wallace Shep Pitts; Neil Di Spigna; Paul Franzon

2011-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Mechanical Design and Evaluation of the MP-11-Like Wire Scanner Prototype  

SciTech Connect

A wire scanner (WS) is a linearly actuated diagnostic device that uses fiber wires (such as Tungsten or Silicon Carbide) to obtain the position and intensity profile of the proton beam at the Los Alamos Neutron Science Center (LANSCE) particle accelerator. LANSCE will be installing approximately 86 new WS in the near future as part of the LANSCE Risk Mitigation project. These 86 new WS include the replacement of many current WS and some newly added to the current linear accelerator and other beam lines. The reason for the replacement and addition of WS is that many of the existing actuators have parts that are no longer readily available and are difficult to find, thus making maintenance very difficult. One of the main goals is to construct the new WS with as many commercially-available-off-the-shelf components as possible. In addition, faster beam scans (both mechanically and in term of data acquisition) are desired for better operation of the accelerator. This document outlines the mechanical design of the new MP-11-like WS prototype and compares it to a previously built and tested SNS-like WS prototype.

Rodriguez Esparza, Sergio [Los Alamos National Laboratory; Sedillo, James Daniel [Los Alamos National Laboratory; Maestas, Alfred J. [Los Alamos National Laboratory; Gilpatrick, John D. [Los Alamos National Laboratory; Smith, Brian G. [Los Alamos National Laboratory; Raybun, Joseph L. [Los Alamos National Laboratory; Martinez, Jason P. [Los Alamos National Laboratory; Sattler, F. D. [Los Alamos National Laboratory; Gruchalla, Michael E. [Los Alamos National Laboratory

2012-05-16T23:59:59.000Z

62

Wire brush fastening device  

DOE Patents (OSTI)

A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus.

Meigs, Richard A. (East Concord, NY)

1995-01-01T23:59:59.000Z

63

Wire brush fastening device  

DOE Patents (OSTI)

A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus.

Meigs, R.A.

1993-08-31T23:59:59.000Z

64

Wire brush fastening device  

DOE Patents (OSTI)

A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus. 13 figs.

Meigs, R.A.

1995-09-19T23:59:59.000Z

65

Enhanced Diffusional Processes in Wire Bonding  

Science Conference Proceedings (OSTI)

Presentation Title, Enhanced Diffusional Processes in Wire Bonding ... there is a tremendous need for implementation of thinner wires in wire boning processes.

66

Beam Position and Phase Monitor - Wire Mapping System  

SciTech Connect

The Los Alamos Neutron Science Center (LANSCE) deploys many cylindrical beam position and phase monitors (BPPM) throughout the linac to measure the beam central position, phase and bunched-beam current. Each monitor is calibrated and qualified prior to installation to insure it meets LANSCE requirements. The BPPM wire mapping system is used to map the BPPM electrode offset, sensitivity and higher order coefficients. This system uses a three-axis motion table to position the wire antenna structure within the cavity, simulating the beam excitation of a BPPM at a fundamental frequency of 201.25 MHz. RF signal strength is measured and recorded for the four electrodes as the antenna position is updated. An effort is underway to extend the systems service to the LANSCE facility by replacing obsolete electronic hardware and taking advantage of software enhancements. This paper describes the upgraded wire positioning system's new hardware and software capabilities including its revised antenna structure, motion control interface, RF measurement equipment and Labview software upgrades. The main purpose of the wire mapping system at LANSCE is to characterize the amplitude response versus beam central position of BPPMs before they are installed in the beam line. The wire mapping system is able to simulate a beam using a thin wire and measure the signal response as the wire position is varied within the BPPM aperture.

Watkins, Heath A [Los Alamos National Laboratory; Shurter, Robert B. [Los Alamos National Laboratory; Gilpatrick, John D. [Los Alamos National Laboratory; Kutac, Vincent G. [Los Alamos National Laboratory; Martinez, Derwin [Los Alamos National Laboratory

2012-04-10T23:59:59.000Z

67

An Investigation of Wire Breaks Created during Copper Wire ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, Materials Science & Technology 2010. Symposium, Failure Analysis and Prevention. Presentation Title, An Investigation of Wire ...

68

Notice of Availability of the Draft Environmental Impact Statement for the Proposed Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM (DOE/EIS-0350)(5/15/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96 96 Federal Register / Vol. 68, No. 94 / Thursday, May 15, 2003 / Notices [FR Doc. 03-12161 Filed 5-14-03; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY National Nuclear Security Administration Notice of Availability of the Draft Environmental Impact Statement for the Proposed Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM AGENCY: U.S. Department of Energy, National Nuclear Security Administration. ACTION: Notice of availability and public hearings. SUMMARY: Pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended (42 U.S.C. 4321 et seq.), and the DOE Regulations Implementing NEPA (10 CFR part 1021), the National Nuclear Security Administration (NNSA), an agency

69

Alliant Energy (Wisconsin Power and Light) - Farm Wiring Grant Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alliant Energy (Wisconsin Power and Light) - Farm Wiring Grant Alliant Energy (Wisconsin Power and Light) - Farm Wiring Grant Program Alliant Energy (Wisconsin Power and Light) - Farm Wiring Grant Program < Back Eligibility Agricultural Maximum Rebate $9,000 Program Info State Wisconsin Program Type Utility Grant Program Rebate Amount $1,000 plus 50% of remaining costs Provider Alliant Energy Alliant Energy (Wisconsin Power and Light) offers a Farm Wiring Grant program to increase farm safety, productivity and efficiency. The first $1,000 of the cost of the project is covered by a grant, as well as 50% of the remaining costs (up to $9,000), for a maximum grant incentive of $10,000. Alliant Energy will inspect the facility for stray voltage and recommend improvements. Alliant's Farm Wiring Financing Program also offers

70

Improved wire chamber  

DOE Patents (OSTI)

An improved gas mixture for use with proportional counter devices, such as Geiger-Mueller tubes and drift chambers. The improved gas mixture provides a stable drift velocity while eliminating wire aging caused by prior art gas mixtures. The new gas mixture is comprised of equal parts argon and ethane gas and having approximately 0.25% isopropyl alcohol vapor. 2 figs.

Atac, M.

1987-05-12T23:59:59.000Z

71

HVAC equipment replacement for best size and efficiency  

DOE Green Energy (OSTI)

The purpose of this project was to explore the potential benefits of HVAC equipment replacement for buildings owned by the City of Phoenix. The specific research objectives were as follows: Establishment an understanding of the magnitude and sources of saving available through equipment replacement; Establish an economic model for understanding equipment replacement and deciding when equipment should be replaced; Establish technical methods for calculating savings from replacement of various types of equipment; Demonstrate the replacement of a major item of HVAC equipment and document the savings through actual experimentation and measurement; and Provide guidance material for other jurisdictions wishing to investigate equipment replacement. 11 figs., 9 tabs.

Teji, D.S.

1988-02-01T23:59:59.000Z

72

Wire Bonder: Kulicke and Soffa Model 4526  

Science Conference Proceedings (OSTI)

Wire Bonder: Kulicke and Soffa Model 4526. Description: CORAL Name: Wire Bonder. Needs Description. Scientific Opportunities / Applications: ...

2013-05-23T23:59:59.000Z

73

We Energies- Livestock and Dairy Farm Electrical Re-wiring Program  

Energy.gov (U.S. Department of Energy (DOE))

Any We Energies dairy farm customer can apply for assistance with a re-wiring project. We Energies would pay the first $1,000 of the project and 50 percent of remaining costs up to a total grant of...

74

Superconducting magnet wire  

DOE Patents (OSTI)

A superconducting tape or wire with an improved critical field is formed of alternating layers of a niobium-containing superconductor such as Nb, NbTi, Nb.sub.3 Sn or Nb.sub.3 Ge with a thickness in the range of about 0.5-1.5 times its coherence length, supported and separated by layers of copper with each copper layer having a thickness in the range of about 170-600 .ANG..

Schuller, Ivan K. (Woodridge, IL); Ketterson, John B. (Evanston, IL); Banerjee, Indrajit (San Jose, CA)

1986-01-01T23:59:59.000Z

75

Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by Harlingen Irrigation District Cameron County No. 1 to the North American Development Bank (NADBank). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for each of the four components of the proposed project (i.e., canal meters and telemetry equipment, impervious-lining of delivery canals, 24" pipelines replacing delivery canals, and on-farm delivery-site meters). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost of water savings and cost of energy savings for each of the four components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $31.37 per ac-ft and energy savings are measured at an aggregate value of $0.0002253 per BTU (i.e., $0.769 per kwh). In addition, expected values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $26.87 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0001603 per BTU ($0.547 per kwh). The amount of initial construction costs per dollar of total annual economic savings is estimated to be -1.30.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2002-10-01T23:59:59.000Z

76

Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Interconnect Between Canals 39 and 13-A1 and Replacement of Rio Grande Diversion Pumping Plant  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by the Cameron County Irrigation District No. 2 (a.k.a. San Benito) to the North American Development Bank (NADBank) and Bureau of Reclamation. Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., a lined interconnect between Canals 39 and 13-A1 and replacement of the Rio Grande diversion pumping plant). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost of water savings and cost of energy savings for both components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $41.26 per ac-ft and energy savings are measured at an aggregate value of $0.0001586 per BTU (i.e., $0.541 per kwh). In addition, expected values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $157.07 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0001777 per BTU ($0.606 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -3.80.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2003-01-01T23:59:59.000Z

77

Radiation Source Replacement Workshop  

Science Conference Proceedings (OSTI)

This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

2010-12-01T23:59:59.000Z

78

Wire detecting apparatus and method  

DOE Patents (OSTI)

This invention is comprised of an apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receiver`s position with respect to the wiring. The receiver`s audible signal is strongest when the receiver is directly above the wiring and the long axis of the receiver`s coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring`s concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest.

Kronberg, J.W.

1991-12-31T23:59:59.000Z

79

Dual wire welding torch and method  

SciTech Connect

A welding torch includes a nozzle with a first welding wire guide configured to orient a first welding wire in a first welding wire orientation, and a second welding wire guide configured to orient a second welding wire in a second welding wire orientation that is non-coplanar and divergent with respect to the first welding wire orientation. A method of welding includes moving a welding torch with respect to a workpiece joint to be welded. During moving the welding torch, a first welding wire is fed through a first welding wire guide defining a first welding wire orientation and a second welding wire is fed through a second welding wire guide defining a second welding wire orientation that is divergent and non-coplanar with respect to the first welding wire orientation.

Diez, Fernando Martinez (Peoria, IL); Stump, Kevin S. (Sherman, IL); Ludewig, Howard W. (Groveland, IL); Kilty, Alan L. (Peoria, IL); Robinson, Matthew M. (Peoria, IL); Egland, Keith M. (Peoria, IL)

2009-04-28T23:59:59.000Z

80

Glass Drawing for Wire Arrays  

The size of the wafer is limited only by how much fiber is bundled prior to fusion. Since the wire is not actually being drawn, ...

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

high strength steel wire products  

Science Conference Proceedings (OSTI)

This Table of Contents is from Metallurgy, Processing, and Applications of Metal Wires--State of the Art Technology and Challenges for the Future published by ...

82

Wire Scanner Beam Profile Measurements: LANSCE Facility Beam Development  

SciTech Connect

The Los Alamos Neutron Science Center (LANSCE) is replacing Wire Scanner (WS) beam profile measurement systems. Three beam development tests have taken place to test the new wire scanners under beam conditions. These beam development tests have integrated the WS actuator, cable plant, electronics processors and associated software and have used H{sup -} beams of different beam energy and current conditions. In addition, the WS measurement-system beam tests verified actuator control systems for minimum profile bin repeatability and speed, checked for actuator backlash and positional stability, tested the replacement of simple broadband potentiometers with narrow band resolvers, and tested resolver use with National Instruments Compact Reconfigurable Input and Output (cRIO) Virtual Instrumentation. These beam tests also have verified how trans-impedance amplifiers react with various types of beam line background noise and how noise currents were not generated. This paper will describe these beam development tests and show some resulting data.

Gilpatrick, John D. [Los Alamos National Laboratory; Batygin, Yuri K. [Los Alamos National Laboratory; Gonzales, Fermin [Los Alamos National Laboratory; Gruchalla, Michael E. [Los Alamos National Laboratory; Kutac, Vincent G. [Los Alamos National Laboratory; Martinez, Derwin [Los Alamos National Laboratory; Sedillo, James Daniel [Los Alamos National Laboratory; Pillai, Chandra [Los Alamos National Laboratory; Rodriguez Esparza, Sergio [Los Alamos National Laboratory; Smith, Brian G. [Los Alamos National Laboratory

2012-05-15T23:59:59.000Z

83

Improved superconducting magnet wire  

DOE Patents (OSTI)

This invention is directed to a superconducting tape or wire composed of alternating layers of copper and a niobium-containing superconductor such as niobium of NbTi, Nb/sub 3/Sn or Nb/sub 3/Ge. In general, each layer of the niobium-containing superconductor has a thickness in the range of about 0.05 to 1.5 times its coherence length (which for Nb/sub 3/Si is 41 A) with each copper layer having a thickness in the range of about 170 to 600 A. With the use of very thin layers of the niobium composition having a thickness within the desired range, the critical field (H/sub c/) may be increased by factors of 2 to 4. Also, the thin layers of the superconductor permit the resulting tape or wire to exhibit suitable ductility for winding on a magnet core. These compositions are also characterized by relatively high values of critical temperature and therefore will exhibit a combination of useful properties as superconductors.

Schuller, I.K.; Ketterson, J.B.

1983-08-16T23:59:59.000Z

84

Video face replacement  

E-Print Network (OSTI)

We present a method for replacing facial performances in video. Our approach accounts for differences in identity, visual appearance, speech, and timing between source and target videos. Unlike prior work, it does not ...

Dale, Kevin

85

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

86

Torpedo Speciality Wire Inc | Open Energy Information  

Open Energy Info (EERE)

Torpedo Speciality Wire Inc Jump to: navigation, search Name Torpedo Speciality Wire Inc Place Rocky Mount, North Carolina Zip 27804 Sector Solar Product North Carolina-based maker...

87

Ignition and spread of electrical wire fires  

E-Print Network (OSTI)

pilot source, placed in the center of the wire sample to initiate ignition, which heats the wire through both convection (major) and radiation (

Huang, Xinyan

2012-01-01T23:59:59.000Z

88

Diamond Wire Technology LLC | Open Energy Information  

Open Energy Info (EERE)

Wire Technology LLC Jump to: navigation, search Name Diamond Wire Technology LLC Place Colorado Springs, Colorado Zip 80916 Sector Solar Product US-based manufacturer of diamond...

89

Plasma chemistry in wire chambers  

SciTech Connect

The phenomenology of wire chamber aging is discussed and fundamentals of proportional counters are presented. Free-radical polymerization and plasma polymerization are discussed. The chemistry of wire aging is reviewed. Similarities between wire chamber plasma (>1 atm dc-discharge) and low-pressure rf-discharge plasmas, which have been more widely studied, are suggested. Construction and use of a system to allow study of the plasma reactions occurring in wire chambers is reported. A proportional tube irradiated by an {sup 55}Fe source is used as a model wire chamber. Condensable species in the proportional tube effluent are concentrated in a cryotrap and analyzed by gas chromatography/mass spectrometry. Several different wire chamber gases (methane, argon/methane, ethane, argon/ethane, propane, argon/isobutane) are tested and their reaction products qualitatively identified. For all gases tested except those containing methane, use of hygroscopic filters to remove trace water and oxygen contaminants from the gas resulted in an increase in the average molecular weight of the products, consistent with results from low-pressure rf-discharge plasmas. It is suggested that because water and oxygen inhibit polymer growth in the gas phase that they may also reduce polymer deposition in proportional tubes and therefore retard wire aging processes. Mechanistic implications of the plasma reactions of hydrocarbons with oxygen are suggested. Unresolved issues in this work and proposals for further study are discussed.

Wise, J.

1990-05-01T23:59:59.000Z

90

First SNS Target Replacement  

E-Print Network (OSTI)

· Replacement of the target module was accomplished using only remote handling tooling and procedures (hands operations. Remote Handling Control Room Manipulator Gallery #12;10 Managed by UT-Battelle for the U ­ Interim process fitting leak testing ­ Limitations on remote handling equipment reliability ­ Limitations

McDonald, Kirk

91

Microsoft Word - B-8.Replacement-3.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Rate Schedule Replacement-3 Availability: This rate schedule shall be available to public bodies and cooperatives ( any one of whom is hereinafter called the Customer) in Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky and southern Illinois to whom power is provided pursuant to contracts between the Government and the customer from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, Cordell Hull, and Laurel Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") . Applicability: This rate schedule shall be applicable to the sale of wholesale energy purchased to

92

ARRANGEMENT FOR REPLACING FILTERS  

DOE Patents (OSTI)

An improved filtered air exhaust system which may be continually operated during the replacement of the filters without the escape of unfiltered air is described. This is accomplished by hermetically sealing the box like filter containers in a rectangular tunnel with neoprene covered sponge rubber sealing rings coated with a silicone impregnated pneumatic grease. The tunnel through which the filters are pushed is normal to the exhaust air duct. A number of unused filters are in line behind the filters in use, and are moved by a hydraulic ram so that a fresh filter is positioned in the air duct. The used filter is pushed into a waiting receptacle and is suitably disposed. This device permits a rapid and safe replacement of a radiation contaminated filter without interruption to the normal flow of exhaust air.

Blomgren, R.A.; Bohlin, N.J.C.

1957-08-27T23:59:59.000Z

93

Low-Cost Superconducting Wire for Wind Generators: High Performance, Low Cost Superconducting Wires and Coils for High Power Wind Generators  

SciTech Connect

REACT Project: The University of Houston will develop a low-cost, high-current superconducting wire that could be used in high-power wind generators. Superconducting wire currently transports 600 times more electric current than a similarly sized copper wire, but is significantly more expensive. The University of Houston’s innovation is based on engineering nanoscale defects in the superconducting film. This could quadruple the current relative to today’s superconducting wires, supporting the same amount of current using 25% of the material. This would make wind generators lighter, more powerful and more efficient. The design could result in a several-fold reduction in wire costs and enable their commercial viability of high-power wind generators for use in offshore applications.

None

2012-01-01T23:59:59.000Z

94

Steam generator replacement overview  

Science Conference Proceedings (OSTI)

Since nuclear power began to be widely used for commercial purposes in the 1960s, unit operators have experienced a variety of problems with major components. Although many of the problems have diminished considerably, those associated with pressurized water reactor (PWR) steam generators persist. Steam generator problems rank second, behind refueling outages, as the most significant contributor to lost electricity generation. As of December 31, 1995, 38 steam generators had been replaced in 13 of the 72 operating PWRs, and three units had been shut down prematurely, due primarily (or partially) to degradation of their steam generators: Portland General Electric`s Trojan unit, located in Prescott, OR, in 1992; Southern California Edison`s San Onofre 1, located in San Clemente, CA, in 1992; and Sacramento Municipal Utility District`s Rancho Seco unit in 1989. In the coming years, operators of PWRs in the US with degraded steam generators will have to decide whether to make annual repairs (with eventual derating likely), replace the generators or shut the plants down prematurely. To understand the issues and decisions utility managers face, this article examines problems encountered at steam generators over the past few decades and identifies some of the remedies that utility operators and the nuclear community have employed, including operational changes, maintenance, repairs and steam generator replacement.

Chernoff, H. [Science Applications International Corp., McLean, VA (United States); Wade, K.C. [USDOE Energy Information Administration, Washington, DC (United States)

1996-01-01T23:59:59.000Z

95

Sizing of Overhead Ground Wires for Lightning  

Science Conference Proceedings (OSTI)

Overhead ground wires, or shield wires, are placed on transmission lines as air terminals for lightning strikes to shield the phase conductors from direct strikes. Although of short duration, lightning strikes to ground wires may result in significant damage. Utilities are increasingly using optical fiber ground wires (OPGWs), and severe damage to the OPGWs could result in failure of the communication link. There is renewed interest in the dimensioning and testing of ground wires for improved ...

2012-12-12T23:59:59.000Z

96

Project title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

97

Plasma arc torch with coaxial wire feed  

SciTech Connect

A plasma arc welding apparatus having a coaxial wire feed. The apparatus includes a plasma arc welding torch, a wire guide disposed coaxially inside of the plasma arc welding torch, and a hollow non-consumable electrode. The coaxial wire guide feeds non-electrified filler wire through the tip of the hollow non-consumable electrode during plasma arc welding. Non-electrified filler wires as small as 0.010 inches can be used. This invention allows precision control of the positioning and feeding of the filler wire during plasma arc welding. Since the non-electrified filler wire is fed coaxially through the center of the plasma arc torch's electrode and nozzle, the wire is automatically aimed at the optimum point in the weld zone. Therefore, there is no need for additional equipment to position and feed the filler wire from the side before or during welding.

Hooper, Frederick M (Albuquerque, NM)

2002-01-01T23:59:59.000Z

98

Preparation of Aluminum Nickel Nanosized Powders by Pulsed Wire ...  

Science Conference Proceedings (OSTI)

With the direct heating of wire by the current, the whole wire evaporates within a few microseconds and then condenses in inert gas. Wound wires with two or ...

99

Laser Cladding with Hybrid Hot Wire - Programmaster.org  

Science Conference Proceedings (OSTI)

Presentation Title, Laser Cladding with Hybrid Hot Wire ... The Laser Hot Wire process is used to deposit solid and cored wire products onto hydraulic shafts and ...

100

Wire Making Techniques - HTS Coated Conductors - Fact Sheet ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wire Making Techniques - HTS Coated Conductors - Fact Sheet Wire Making Techniques - HTS Coated Conductors - Fact Sheet Wire Making Techniques - HTS Coated Conductors - Fact Sheet...

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

DOE/EA-1497: Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Intake Pipeline Replacement Project, Cameron and Calcasieu Parishes, Louisiana (8/31/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINDING OF NO SIGNIFICANT IMPACT FINDING OF NO SIGNIFICANT IMPACT RAW WATER INTAKE PIPELINE REPLACEMENT STRATEGIC PETROLEUM RESERVE WEST HACKBERRY FACILITY AGENCY: Department of Energy (DOE) ACTION: Finding of No Significant Impact (FONSI) SUMMARY: DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of

102

Categorical Exclusion Determination Form Proposed Action Title: (0473-1597) Smart Wire Grid, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97) Smart Wire Grid, Inc. - 97) Smart Wire Grid, Inc. - Distributed Power Flow Contro l Using Smart Wires for Energy Routing Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): California, Missouri, North Carolina, Georgia, Wash ington, Pennsylvania, and Tennessee Proposed Action Description: Funding will support development of a Smart Wire System Controller and an energy router software to enable distributed agents to coordinate with the control center, improve power flow control, and take advantage of unused capacity within the existing transmission system. In addition, the power controller will enable grid operators to optimize transmission assets to fully integrate variable renewable energy sources. Proposed work consists of (1) designing, developing, testing, and optimizing the Smart Wire System Controller to meet utility specifications; (2)

103

Electrical wire insulation and electromagnetic coil  

DOE Patents (OSTI)

An electromagnetic coil for high temperature and high radiation application in which glass is used to insulate the electrical wire. A process for applying the insulation to the wire is disclosed which results in improved insulation properties.

Bich, George J. (Penn Hills, PA); Gupta, Tapan K. (Monroeville, PA)

1984-01-01T23:59:59.000Z

104

McCullough to Liberty fiber optics project  

SciTech Connect

The US Department of Energy, Western Area Power Administration (Western) proposes to replace an existing overhead static wire with a shield wire that contains optical fibers (OPGW) on transmission lines from McCullough Substation, south of Las Vegas, Nevada, to Liberty Substation near Phoenix, Arizona. The replacement will occur on the McCullough-Davis, Davis-Parker No. 2, and Parker-Liberty No. 1 230-kV transmission lines. Western is responsible for the operation and maintenance of the lines. Western prepared an Environmental Assessment (EA) entitled ``McCullough to Liberty Fiber Optics Project`` (DOE/EA-1202). The EA contains the analysis of the proposed construction, operation, and maintenance of the OPGW. Based on the analysis in the EA, Western finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. The preparation of an environmental impact statement (EIS) is not required, and therefore, Western is issuing this Findings of No Significant Impact (FONSI).

NONE

1997-05-01T23:59:59.000Z

105

Guidelines for Intelligent Asset Replacement  

Science Conference Proceedings (OSTI)

EPRI8217s asset management research focuses on developing a rational basis for selecting repair or replacement options for specific classes of equipment by balancing the risks of equipment failure against the costs of continued maintenance or capital replacement. This report, the fourth report on guidelines for asset replacement, discusses methods for making decisions about wood poles. It significantly enhances a prior report on this subject by explicitly modeling pole degradation, inspection and test ef...

2006-12-18T23:59:59.000Z

106

HALON REPLACEMENT RESEARCH - A HISTORICAL ...  

Science Conference Proceedings (OSTI)

... Tapscott, RE, “Progress Report on Alternatives and Replacements for Halons,” E&P Forum Halon Phase-Out Workshop, London, United Kingdom ...

2011-10-11T23:59:59.000Z

107

Energy efficiency and appliance replacement  

E-Print Network (OSTI)

1004 ENERGY EFFICIENCY AND APPLIANCE REPLACEMENT Jeffrey T.adopt energy efficient appliances, even though the financialmix of energy–using appliances predicts that under plausible

LaFrance, Jeffrey T.

2005-01-01T23:59:59.000Z

108

Replace Kilogram Standard? NIST Weighs Options  

Science Conference Proceedings (OSTI)

... Replace Kilogram Standard? ... For some time, scientists have considered replacing the kilogram mass standard with a natural constant. ...

109

Method and apparatus for laying wire arrays  

DOE Patents (OSTI)

Wire arrays (11) having a continuous wire (12) which is formed into a predetermined pattern and adhered to a backing material or substrate (13) are fabricated by applying adhesive material (16a, 16b) along opposite edge portions (17, 18) of the substrate, positioning a row of winding spools (21) along each of the edge portions and repeatedly extending the wire between and around successive spools at the opposite edge portions. The wound wire is then traveled along each spool toward the substrate and into contact with the adhesive. The spools are then removed and a coating of hardenable material (54) is applied to secure the wound wire to the substrate. Tension in the wire is relieved prior to contact of the wire with the adhesive and a small amount of slack is introduced into the wire before the final coating step. Mechanism (32) is provided for lifting the spools away from the substrate without disturbing the wound wire. The method and apparatus enable manufacture of precisely configured wire arrays without complex or costly equipment and do not require structural alterations in the substrate for the purpose of accommodating to fabrication equipment.

Horowitz, Seymour M. (6525 Swainland Dr., Oakland, CA 94611); Nesbitt, Dale D. (1712 Marin Ave., Berkeley, CA 94707)

1986-01-01T23:59:59.000Z

110

Spectroscopic research of underwater electrical wire explosion  

Science Conference Proceedings (OSTI)

Results of spectroscopic research in the visible range of light of the radiation generated by underwater electrical wire explosions (UEWE) are presented. A pulsed generator with an output voltage of {approx}110 kV, current of {approx}70 kA, and rise time of {approx}60 ns was used for electrical explosion of Cu wires 0.1 mm in diameter and 50 mm in length. It was shown that UEWE is not governed by the 'polarity' effect, which plays an important role in electrical wire explosions in vacuum. The results of detailed space- and time-resolved spectroscopic measurements show that the radiation spectrum differs significantly of the spectrum expected from the exploding wire. A model is suggested based on the formation of a few {mu}m 'water' plasma layer in the vicinity of the exploding wire plasma which efficiently absorbs the radiation of the exploding wire.

Fedotov, A.; Sheftman, D.; Gurovich, V. Tz.; Efimov, S.; Bazilitski, G.; Krasik, Ya. E. [Physics Department, Technion-Israel Institute of Technology, 32000 Haifa (Israel); Oreshkin, V. I. [Institute of High Current Electronics, RAS, Tomsk (Russian Federation)

2008-08-15T23:59:59.000Z

111

Mixed and Dynamic Response of Hot Wires and Cold Wires and Measurements of Turbulence Statistics  

Science Conference Proceedings (OSTI)

Hot wires respond to temperature as well as to velocity, whereas cold wires respond to velocity as well as to temperature. The static and dynamic response characteristics are summarized and it is shown that the frequency transfer functions for ...

S. E. Larsen; J. Hojstrup; C. W. Fairall

1986-06-01T23:59:59.000Z

112

High Strength Gold Wire for Microelectronics Miniaturization ...  

ISU and Ames Laboratory researchers have developed a high strength gold wire for use in microelectronics that can maintain its electrical and mechanical properties ...

113

ORNL superconducting wire yields unprecedented performance |...  

NLE Websites -- All DOE Office Websites (Extended Search)

ORNL | News | News Releases | 2013 SHARE Media Contact: Morgan McCorkle Communications 865.574.7308 ORNL superconducting wire yields unprecedented performance This figure shows the...

114

Thin californium-containing radioactive source wires  

SciTech Connect

A cermet wire includes at least 1% californium-252 and is characterized by a diameter of no more than 0.0225 inch.

Gross, Ian G (Clinton, TN); Pierce, Larry A (Kingston, TN)

2012-01-03T23:59:59.000Z

115

Microsoft Word - CX-TroutdaleWindowReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2011 , 2011 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Eric Weekley Project Manager - NWM-4 Proposed Action: Replace existing steel windows at the Troutdale Substation control house PP&A Project No.: PP&A-1699 Budget Information: Work Order No. 242796 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities and custodial services for buildings, structures, ... Location: Bonneville Power Administration's (BPA) Troutdale Substation located in Troutdale, Oregon Proposed by: BPA Description of the Proposed Action: BPA proposes to replace the deteriorating existing steel windows at the Troutdale Substation control house with new, in-kind steel windows.

116

Wafer Replacement Cluster Tool (Presentation);  

DOE Green Energy (OSTI)

This presentation on wafer replacement cluster tool discusses: (1) Platform for advanced R and D toward SAI 2015 cost goal--crystal silicon PV at area costs closer to amorphous Si PV, it's 15% efficiency, inexpensive substrate, and moderate temperature processing (<800 C); (2) Why silicon?--industrial and knowledge base, abundant and environmentally benign, market acceptance, and good efficiency; and (3) Why replace wafers?--expensive, high embedded energy content, and uses 50-100 times more silicon than needed.

Branz, H. M.

2008-04-01T23:59:59.000Z

117

Replaces EIA-459E OMB Control No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 (04-94) Replaces EIA-459E OMB Control No. 1910-0400 U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MANAGEMENT SUMMARY REPORT Page of Public reporting burden for this collection of information is estimated to average 3.38 hours per response, including the time for reviewing instructions, search- ing existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Office of Information Resources Management Policy, Plans, and Oversight, Records Management Division, HR-422 - GTN, Paperwork Reduction Project (1910-0400), U.S. Department of Energy, 1000 Independence Avenue, S.W., Washington, DC 20585; and to the Office of Management and Budget (OMB), Paperwork Reduction Project

118

SnO2 sub-micron wires for gas sensors  

Science Conference Proceedings (OSTI)

In the present work a novel semiconductor metal-oxide (MOX) gas sensor is developed by means of lithographic techniques. The basic idea is to replace the continuous sensing film of standard MOX sensors with a pattern of wires in the sub-micron scale. ... Keywords: E-beam lithography, Gas sensors, Semiconductor metal-oxide, SiO2 reactive ion etching, Tin dioxide

P. Candeloro; A. Carpentiero; S. Cabrini; E. Di Fabrizio; E. Comini; C. Baratto; G. Faglia; G. Sberveglieri; A. Gerardino

2005-03-01T23:59:59.000Z

119

LANSCE-R WIRE-SCANNER SYSTEM  

SciTech Connect

The National Instruments cRIO platform is used for the new LANSCE-R wire-scanner systems. All wire-scanner electronics are integrated into a single BiRa BiRIO 4U cRIO chassis specifically designed for the cRIO crate and all interface electronics. The BiRIO chassis, actuator and LabVIEW VIs provide a complete wire-scanner system integrated with EPICS. The new wire-scanner chassis includes an 8-slot cRIO crate with Virtex-5 LX 110 FPGA and Power-PC real-time controller, the LANL-developed cRIO 2-axis wire-sensor analog interface module (AFE), NI9222 cRIO 4-channel 16-bit digitizer, cRIO resolver demodulator, cRIO event receiver, front-panel touch panel display, motor driver, and all necessary software, interface wiring, connectors and ancillary components. This wirescanner system provides a complete, turn-key, 2-axis wire-scanner system including 2-channel low-noise sensewire interface with variable DC wire bias and wireintegrity monitor, 16-bit signal digitizers, actuator motor drive and control, actuator position sensing, limit-switch interfaces, event receiver, LabVIEW and EPICS interface, and both remote operation and full stand-alone operation using the touch panel.

Gruchalla, Michael E. [Los Alamos National Laboratory

2011-01-01T23:59:59.000Z

120

Superconducting wire with improved strain characteristics  

DOE Patents (OSTI)

A superconducting wire comprising a superconducting filament and a beryllium strengthened bronze matrix in which the addition of beryllium to the matrix permits a low volume matrix to exhibit reduced elastic deformation after heat treating which increases the compression of the superconducting filament on cooling and thereby improves the strain characteristics of the wire.

Luhman, Thomas (Westhampton Beach, NY); Klamut, Carl J. (E. Patchogue, NY); Suenaga, Masaki (Bellport, NY); Welch, David (Stony Brook, NY)

1982-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Superconducting wire with improved strain characteristics  

DOE Patents (OSTI)

A superconducting wire comprising a superconducting filament and a beryllium strengthened bronze matrix in which the addition of beryllium to the matrix permits a low volume matrix to exhibit reduced elastic deformation after heat treating which increases the compression of the superconducting filament on cooling and thereby improve the strain characteristics of the wire.

Luhman, Thomas (Westhampton Beach, NY); Klamut, Carl J. (East Patchogue, NY); Suenaga, Masaki (Bellport, NY); Welch, David (Stony Brook, NY)

1982-01-01T23:59:59.000Z

122

Superconducting wire with improved strain characteristics  

DOE Patents (OSTI)

A superconducting wire comprising a superconducting filament and a beryllium strengthened bronze matrix in which the addition of beryllium to the matrix permits a low volume matrix to exhibit reduced elastic deformation after heat treating which increases the compression of the superconducting filament on cooling and thereby improve the strain characteristics of the wire.

Luhman, T.; Klamut, C.J.; Suenaga, M.; Welch, D.

1979-12-19T23:59:59.000Z

123

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

1994-02-01T23:59:59.000Z

124

Method of preparing composite superconducting wire  

DOE Patents (OSTI)

An improved method of preparing composite multifilament superconducting wire of Nb.sub.3 Sn in a copper matrix which eliminates the necessity of coating the drawn wire with tin. A generalized cylindrical billet of an alloy of copper containing at least 15 weight percent niobium, present in the copper as discrete, randomly distributed and oriented dendritic-shaped particles, is provided with at least one longitudinal opening which is filled with tin to form a composite drawing rod. The drawing rod is then drawn to form a ductile composite multifilament wire containing a filament of tin. The ductile wire containing the tin can then be wound into magnet coils or other devices before heating to diffuse the tin through the wire to react with the niobium forming Nb.sub.3 Sn. Also described is an improved method for making large billets of the copper-niobium alloy by consumable-arc casting.

Verhoeven, John D. (Ames, IA); Gibson, Edwin D. (Ames, IA); Finnemore, Douglas K. (Ames, IA); Ostenson, Jerome E. (Ames, IA); Schmidt, Frederick A. (Ames, IA); Owen, Charles V. (Ames, IA)

1985-08-06T23:59:59.000Z

125

Improved method of preparing composite superconducting wire  

DOE Patents (OSTI)

An improved method of preparing composite multifilament superconducting wire of Nb/sub 3/Sn in a copper matrix eliminates the necessity of coating the drawn wire with tin. A generalized cylindrical billet of an alloy of copper containing at least 15 weight percent niobium, present in the copper as discrete, randomly distributed and oriented dendritic-shaped particles, is provided with at least one longitudinal opening which is filled with tin to form a composite drawing rod. The drawing rod is then drawn to form a ductile composite multifilament wire containing a filament of tin. The ductile wire containing the tin can then be wound into magnet coils or other devices before heating to diffuse the tin through the wire to react with the niobium forming Nb/sub 3/Sn. Also described is an improved method for making large billets of the copper-niobium alloy by consumable-arc casting.

Verhoeven, J.D.; Gibson, E.D.; Finnemore, D.K.; Ostenson, J.E.; Schmidt, F.A.; Owen, C.V.

1979-10-17T23:59:59.000Z

126

Improved method of preparing composite superconducting wire  

DOE Patents (OSTI)

An improved method of preparing composite multifilament superconducting wire of Nb/sub 3/Sn in a copper matrix which eliminates the necessity of coating the drawn wire with tin is described. A generalized cylindrical billet of an alloy of copper containing at least 15 weight percent niobium, present in the copper as discrete, randomly distributed and oriented dendritic-shaped particles, is provided with at least one longitudinal opening which is filled with tin to form a composite drawing rod. The drawing rod is then drawn to form a ductile composite multifilament wire containing a filament of tin. The ductile wire containing the tin can then be wound into magnet coils or other devices before heating to diffuse the tin through the wire to react with the niobium forming Nb/sub 3/Sn. Also described is an improved method for making large billets of the copper-niobium alloy by consumable-arc casting.

Verhoeven, J.D.; Gibson, E.D.; Finnemore, D.K.; Ostenson, J.E.; Schmidt, F.A.; Owen, C.V.

1981-04-24T23:59:59.000Z

127

Early expansion in exploding multiple wire arrays  

Science Conference Proceedings (OSTI)

A simple model is developed for the initial stage (blow-off and the onset of pinching) of a multiple exploded wire array. With obvious modifications the model can also be applied to single wires or other self-pinched plasma columns. Each wire in the array is modeled as a plasma cylinder undergoing self-similar radial motion, and the whole array is coupled self-consistently to an external circuit. The plasma expands initially; the onset of self-pinch is shown to be coincident with the plasma conductivity reaching a value large enough for skin effect to occur. The model is run for a variety of system parameters, and the choice of machine and wire parameters to attain particular objectives (e.g., rapid current rise, limited wire expansion, etc.) is discussed.

Bloomberg, H.W.; Lampe, M.; Colombant, D.G.

1980-10-01T23:59:59.000Z

128

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site October 22, 2013 - 11:01am Addthis What does this project do? Goal 1. Protect human health and the environment In August of this year the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Rocky Flats, site took advantage of an existing water diversion structure that was no longer needed, to replace an aging water monitoring flume and avoid future repairs that could interrupt data collection. The flume for Rocky Flats Legacy Management Agreement (RFLMA) Point of Evaluation (POE) monitoring location GS10 in South Walnut Creek was located at the bottom of fairly steep channel banks. The bank on the south side shows localized slumping and sliding toward the creek and GS10. Although

129

Strain tolerant microfilamentary superconducting wire  

DOE Patents (OSTI)

A strain tolerant microfilamentary wire capable of carrying superconducting currents is provided comprising a plurality of discontinuous filaments formed from a high temperature superconducting material. The discontinuous filaments have a length at least several orders of magnitude greater than the filament diameter and are sufficiently strong while in an amorphous state to withstand compaction. A normal metal is interposed between and binds the discontinuous filaments to form a normal metal matrix capable of withstanding heat treatment for converting the filaments to a superconducting state. The geometry of the filaments within the normal metal matrix provides substantial filament-to-filament overlap, and the normal metal is sufficiently thin to allow supercurrent transfer between the overlapped discontinuous filaments but is also sufficiently thick to provide strain relief to the filaments.

Finnemore, Douglas K. (Ames, IA); Miller, Theodore A. (Tuscon, AZ); Ostenson, Jerome E. (Ames, IA); Schwartzkopf, Louis A. (Mankato, MN); Sanders, Steven C. (Ames, IA)

1993-02-23T23:59:59.000Z

130

Microsoft Word - Roza_Transformer_Replacement_CX_Final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clearance Memorandum Clearance Memorandum Patricia Smith Project Manager KEWU-4 Proposed Action: Replace two broken transformers near the Roza Dam adult trap facility Budget Information: Work Order #188534, Task #1 Fish and Wildlife Project No.: 1997-013-25 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. Location: Roza Diversion Dam Adult Trap Facility , Township 15 North, Range 19 East,

131

Sprinkler Head Replacement (4586), 4/24/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sprinkler Head Replacement Projects (4586) Sprinkler Head Replacement Projects (4586) Program or Field Office: Y-12 Site Office Location(s) (Citv/Countv/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: The proposed action is to replace approximately 1 ,300 sprinkler heads upgrade fire protection systems. Categorical Exclusion(s) Applied: 81.3- Routine maintenance Submit by E-mail For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) [{Jrhe proposal fits within a class of actions that is listed in Appendix A orB to 10 CFR Part 1021, Subpart D. To fit within the classes of actions listed in 10 CFR Part 1021, Subpart D, Appendix B, a proposal must be one that would not: (1) threaten

132

Interaction between graphene and metamaterials: split rings vs. wire pairs  

Science Conference Proceedings (OSTI)

We have recently shown that graphene is unsuitable to replace metals in the current-carrying elements of metamaterials. At the other hand, experiments have demonstrated that a layer of graphene can modify the optical response of a metal-based metamaterial. Here we study this electromagnetic interaction between metamaterials and graphene. We show that the weak optical response of graphene can be modified dramatically by coupling to the strong resonant fields in metallic structures. A crucial element determining the interaction strength is the orientation of the resonant fields. If the resonant electric field is predominantly parallel to the graphene sheet (e.g., in a complementary split-ring metamaterial), the metamaterial’s resonance can be strongly damped. If the resonant field is predominantly perpendicular to the graphene sheet (e.g., in a wire-pair metamaterial), no significant interaction exists.

Zou, Yanhong; Tassin, Philippe; Koschny, Thomas; Soukoulis, Costas

2012-05-14T23:59:59.000Z

133

Improvement of Descalability of High Carbon Steel Wire Rods  

Science Conference Proceedings (OSTI)

Presentation Title, Improvement of Descalability of High Carbon Steel Wire Rods ... In the past, hydrochloric and sulfuric acids were used for the purpose of wire ...

134

Material Flow and Texture in Friction Extruded Wire  

Science Conference Proceedings (OSTI)

Presentation Title, Material Flow and Texture in Friction Extruded Wire ... conducted during friction extrusion of AA6061 wire with AA2195 as a marker insert.

135

Reliability of Copper Wire Bonding on Copper Substrate with Tin ...  

Science Conference Proceedings (OSTI)

Suitable bonding conditions, Tin thickness, stage temperature, wire bonding power and bonding time are chosen through wire bonding tests. Peel strength of a ...

136

Transient Melt Pool Response in Wire Feed Electron Beam Direct ...  

Science Conference Proceedings (OSTI)

Presentation Title, Transient Melt Pool Response in Wire Feed Electron Beam Direct ... Abstract Scope, Wire feed electron beam direct digital manufacturing ...

137

HVAC & Building Management Control System Energy Efficiency Replacements  

SciTech Connect

The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

Hernandez, Adriana

2012-09-21T23:59:59.000Z

138

Plant Process Computer Upgrade Guidelines, Volume 1: Replacement Guidelines  

Science Conference Proceedings (OSTI)

The gradual obsolescence of the original plant process computers at nuclear power plants decreases their effectiveness in supporting plant operation and maintenance. This project, based on the practical experience of utility personnel, presents guidelines on plant process computer replacement planning and implementation.

1993-01-01T23:59:59.000Z

139

Annual Coded Wire Tag Program; Oregon Stock Assessment, Annual Report 2002.  

DOE Green Energy (OSTI)

This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife project 'Annual Stock Assessment - Coded Wire Tag Program (ODFW)'. Results for the 2002 contract period: Objective 1 - Over 1 million juvenile salmon were coded-wire by this program (Table 1). This accounted for about 20% of the fish ODFW coded-wire tagged in 2002 for release in the Columbia Basin; Objective 2 - ODFW recovered and processed over 50,000 snouts collected from coded-wire tagged fish (Table 2); Objective 3 - The survival data summarized below includes results for coded-wire groups funded by this program as well as coded-wire groups funded from other sources; Objective 4 - The last returns of experimental groups of coho marked with VIE tags occurred in 2002 at Sandy Hatchery. This sampling showed that 26 of 67 jack coho and 1 of 2,223 adult coho VIE marked as juveniles retained the VIE mark as adults.

Lewis, Mark; Mallette, Christine; Murray, William

2003-03-01T23:59:59.000Z

140

Testing of Replacement Bag Material  

Science Conference Proceedings (OSTI)

Recently, the FB-Line bagout material was changed to simplify the processing of sand, slag, and crucible.The results of the strength tests and the outgassing measurements and calculations demonstrate that the proposed replacement nylon bag materials (HRMP and orange anti-static material) are acceptable substitutes for LDPE and the original nylon with respect to mechanical properties.

Laurinat, J.E.

1998-11-03T23:59:59.000Z

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Sampling streaming data with replacement  

Science Conference Proceedings (OSTI)

Simple random sampling is a widely accepted basis for estimation from a population. When data come as a stream, the total population size continuously grows and only one pass through the data is possible. Reservoir sampling is a method of maintaining ... Keywords: Data stream mining, Random sampling with replacement, Reservoir sampling

Byung-Hoon Park; George Ostrouchov; Nagiza F. Samatova

2007-10-01T23:59:59.000Z

142

Annual Coded-Wire Tag Program : Washington : Missing Production Groups Annual Report for 2000.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) funds the 'Annual Coded-wire Tag Program - Missing Production Groups for Columbia River Hatcheries' project. The Washington Department of Fish and Wildlife (WDFW), Oregon Department of Fish and Wildlife (ODFW) and the United States Fish and Wildlife Service (USFWS) all operate salmon and steelhead rearing programs in the Columbia River basin. The intent of the funding is to coded-wire tag at least one production group of each species at each Columbia Basin hatchery to provide a holistic assessment of survival and catch distribution over time and to meet various measures of the Northwest Power Planning Council's (NWPPC) Fish and Wildlife Program. The WDFW project has three main objectives: (1) coded-wire tag at least one production group of each species at each Columbia Basin hatchery to enable evaluation of survival and catch distribution over time, (2) recover coded-wire tags from the snouts of fish tagged under objective 1 and estimate survival, contribution, and stray rates for each group, and (3) report the findings under objective 2 for all broods of chinook, and coho released from WDFW Columbia Basin hatcheries. Objective 1 for FY-00 was met with few modifications to the original FY-00 proposal. Under Objective 2, snouts containing coded-wire tags that were recovered during FY-00 were decoded. Under Objective 3, this report summarizes available recovery information through 2000 and includes detailed information for brood years 1989 to 1994 for chinook and 1995 to 1997 for coho.

Mills, Robin D.

2002-02-01T23:59:59.000Z

143

The Use of Automatic Wire Coding to Evaluate Control Selection Bias in the Savitz et al. Study  

Science Conference Proceedings (OSTI)

One possible explanation of the association between wire codes and childhood cancer is that selecting controls using random digit dialing techniques may have resulted in controls that were not representative of the population from which the cases arose. An under-representation of controls in the highest wire code category could have created the appearance of an association between that category and childhood cancer. The project was designed to evaluate this possibility in the Savitz et al. study in Denver.

1998-10-05T23:59:59.000Z

144

Replaces DOE F 5120.2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

700.2 700.2 (09-93) Replaces DOE F 5120.2 (02-90) edition may be used 1. INITIATOR: NAME & SIGNATURE ORGANIZATION CODE TELEPHONE NO. 2. PROJECT TITLE: 3. RESPONSIBLE ASSISTANT SECRETARY: 4. RESPONSIBLE OPERATIONS OFFICE: 5. M&O CONTRACTOR NAME: 6. WORK AUTHORIZATION NO.: FUNDS HEREBY AUTHORIZED 7. REVISION: B&R No. $000 13. WORK AUTHORIZED: (Brief description, schedule, results or products and reporting requirements, and any shifting of funds permitted within the work authorization): U.S. DEPARTMENT OF ENERGY Management & Operating (M&O) Contract Work Authorization WORK AUTHORIZATION 14. WORK AUTHORIZATION OFFICIAL: 15. OPERATIONS OFFICE OFFICIAL: 16. M&O CONTRACTOR OFFICIAL: NAME & SIGNATURE DATE 9. PERFORMANCE PERIOD COVERED BY

145

Modeling of Ice Accretion on Wires  

Science Conference Proceedings (OSTI)

A time-dependent numerical model of ice accretion on wires, such as overhead conductors, is presented. Simulations of atmospheric icing are made with the model in order to examine the dependence of the accreted ice amount on atmospheric ...

Lasse Makkonen

1984-06-01T23:59:59.000Z

146

Phase Conductor and Shield Wire Corrosion  

Science Conference Proceedings (OSTI)

As new inspection technologies for conductors and shield wires develop and mature, the assessment process becomes more accurate in identifying and quantifying flaws. With better accuracy, condition assessment can be less conservative, thus allowing utilities to save money by keeping conductors in service for longer periods. This report, which includes the results of a survey of EPRI member utilities on phase conductor and shield wire installations, inspections, and failures, updates recent EPRI work on c...

2007-12-20T23:59:59.000Z

147

Power Quality Improvement Methodology for Wires Companies  

Science Conference Proceedings (OSTI)

This report provides practical utility-side strategies for improving power quality. Much research has been done on the application of custom power devices to mitigate power quality events on transmission and distribution wires systems. However, these solutions can be costly and often benefit a limited number of customers. Many wires companies are looking for ways to improve the overall quality of their service using methods and equipment that are more traditional.

2003-02-11T23:59:59.000Z

148

Energetic additive manufacturing process with feed wire  

DOE Patents (OSTI)

A process for additive manufacture by energetic wire deposition is described. A source wire is fed into a energy beam generated melt-pool on a growth surface as the melt-pool moves over the growth surface. This process enables the rapid prototyping and manufacture of fully dense, near-net shape components, as well as cladding and welding processes. Alloys, graded materials, and other inhomogeneous materials can be grown using this process.

Harwell, Lane D. (Albuquerque, NM); Griffith, Michelle L. (Albuquerque, NM); Greene, Donald L. (Corrales, NM); Pressly, Gary A. (Sandia Park, NM)

2000-11-07T23:59:59.000Z

149

Replacement element for automobile thermostat  

Science Conference Proceedings (OSTI)

This patent describes a thermostat replacement element for use in a cooling system in which a continuous stream of coolant normally flows from a radiator through a thermostat to an engine. The thermostat is mounted within a mounting cavity and permits maximum flow of coolant through the cooling system when in an open position. The replacement element comprises a disc-shaped member having a diameter substantially corresponding to the diameter of the mounting cavity. The member is provided with apertures of a predetermined size to permit flow of coolant therethrough at a rate generally corresponding to the rate of flow of coolant through the thermostat when the thermostat is in an open position.

Ferrari, W.

1988-06-07T23:59:59.000Z

150

Pulsed electromagnetic acceleration of exploded wire plasmas  

Science Conference Proceedings (OSTI)

A simple analysis of the dynamic state of a current-conducting high-density plasma column, resulting from an exploded wire between the conductors of a rail-gun accelerator or one or more wires strung between the anode and cathode conductors in a pulsed-power generator diode, is given on the basis of a one-dimensional magnetohydrodynamics model. Spatial distributions of the current density, magnetic field, temperature, and particle density are calculated as well as the temporal current, voltage, and impedance histories. The model self-consistently treats the accelerator load transition through its solid, melt, vapor, and plasma states in the presence of its supply source and feed network. Once formed and accelerated, the plasma state calculations show expansion cooling across the self-induced magnetic field if the Bennett condition is not satisfied. The model predictions are compared to two experimental situations. The first involves the delivery of some hundreds of Joules of stored energy to the wire load. For this case, good agreement between the calculated and observed plasma state is obtained. The second situation involves the delivery of many thousands of Joules to the wire load. For this case and dependent upon the wire mass, diameter, number of wires exploded, their separation, and the pulsed energy electrical wave shapes, the magnetohydrodynamic results can be qualitatively incorrect. The necessity of an electromagnetic particle simulation approach is indicated in order to resolve the magnetic rope-like structure and filamentation observed in the very energetic plasmas.

Peratt, A.L.; Koert, P.

1983-11-01T23:59:59.000Z

151

Chemistry of radiation damage to wire chambers  

SciTech Connect

Proportional counters are used to study aspects of radiation damage to wire chambers (wire aging). Principles of low-pressure, rf plasma chemistry are used to predict the plasma chemistry in electron avalanches (1 atm, dc). (1) Aging is studied in CF{sub 4}/iC{sub 4}H{sub 10} gas mixtures. Wire deposits are analyzed by Auger electron spectroscopy. An apparent cathode aging process resulting in loss of gain rather than in a self-sustained current is observed in CF{sub 4}-rich gases. A four-part model considering plasma polymerization of the hydrocarbon, etching of wire deposits by CF{sub 4}, acceleration of deposition processes in strongly etching environments, and reactivity of the wire surface is developed to understand anode wire aging in CF{sub 4}/iC{sub 4}H{sub 10} gases. Practical guidelines suggested by the model are discussed. (2) Data are presented to suggest that trace amounts of Freons do not affect aging rates in either dimethyl ether or Ar/C{sub 2}H{sub 6}. Apparent loss of gain is explained by attachment of primary electrons to a continuously increasing concentration of Freon 11 (CCl{sub 3}F) in the counter gas. An increase in the concentration of Freon 11 in dimethyl ether is caused by a distillation process in the gas supply bottle and is a natural consequence of the unequal volatilities of the two compounds.

Wise, J.

1992-08-01T23:59:59.000Z

152

Progammatic mission transformation - chemistry and metallurgy research replacement (CMRR) project  

Science Conference Proceedings (OSTI)

Nuclear posture and policy objectives are: (1) Preventing nuclear proliferation and nuclear terrorism; (2) Reducing the role of nuclear weapons in US national security strategy; (3) Maintaining strategic deterrence and stability at reduced nuclear force levels; (4) Strengthening regional deterrence and reassuring US allies and partners; and (5) Sustaining a safe, secure, and effective nuclear arsenal.

Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

2011-01-24T23:59:59.000Z

153

Replacement-2-A Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-A Wholesale Power Rate Schedule 2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to the sale of wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-2-A Rate Schedule More Documents & Publications Southeastern Power Administration 2010 Annual Report

154

Information Resources: LED Replacements for Linear Fluorescent Lamps  

NLE Websites -- All DOE Office Websites (Extended Search)

Replacements for Linear Fluorescent Lamps Webcast Replacements for Linear Fluorescent Lamps Webcast In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting Facts-listed products as well as products evaluated in the latest CALiPER reports. Eric Richman, also of PNNL, reported on a recently completed GATEWAY demonstration project, in which LED and fluorescent lamps were installed in a variety of recessed troffer luminaires for comparison in an office environment. The presentation concluded with a discussion of specifications listed in a newly updated technology fact sheet. View presentation slides View the text-alternative version View the webcast (WMV 16 MB) Download Windows Media Player

155

Annual Coded Wire Tag Program; Oregon Stock Assessment, 2001 Annual Report.  

DOE Green Energy (OSTI)

This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife project 'Annual Stock Assessment - Coded Wire Tag Program (ODFW)'. Results for the 2001 contract period: Objective 1--Over 1 million juvenile salmon were coded-wire by this program (Table 1); Objective 2--ODFW recovered and processed over 40,000 snout collected from coded-wire tagged fish (Table 2); Objective 3--Survival data is summarized below; Objective 4--The last group of VIE tagged coho was released in 2001 and returning coho were samples at Sandy Hatchery. This sampling showed only 1 of 1,160 returning coho VIE marked as juveniles retained the VIE mark as adults.

Lewis, Mark; Mallette, Christine; Murray, William

2002-03-01T23:59:59.000Z

156

EAC Recommendations for DOE Action on Non-Wires Solutions - October 17, 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 17, 2012 October 17, 2012 RE: Recommendations on Non-Wires Solutions _________________________________________________________________________ Introduction & Overview "Non-Wires Solutions" (NWS), sometimes referred to as Non-Wires Alternatives (NWA), is the umbrella term for ensuring that a portfolio of alternatives to transmission lines is analyzed and considered in the planning and possible permitting of such facilities. This NWS approach would apply to the proposed upgrade or construction of a distribution or transmission line. In essence, NWS is designed to identify the optimal approach to distribution and transmission enhancement, just as integrated resource planning practices are applied to analyzing the need for power generation projects. Thus, it is relevant for DOE to assist in stakeholder

157

Distributed Power Flow Control: Distributed Power Flow Control using Smart Wires for Energy Routing  

Science Conference Proceedings (OSTI)

GENI Project: Smart Wire Grid is developing a solution for controlling power flow within the electric grid to better manage unused and overall transmission capacity. The 300,000 miles of high-voltage transmission line in the U.S. today are congested and inefficient, with only around 50% of all transmission capacity utilized at any given time. Increased consumer demand should be met in part with more efficient and an economical power flow. Smart Wire Grid’s devices clamp onto existing transmission lines and control the flow of power within—much like how internet routers help allocate bandwidth throughout the web. Smart wires could support greater use of renewable energy by providing more consistent control over how that energy is routed within the grid on a real-time basis. This would lessen the concerns surrounding the grid’s inability to effectively store intermittent energy from renewables for later use.

None

2012-04-24T23:59:59.000Z

158

Insulation and Heat Treatment of Bi-2212 Wire for Wind-and-React Coils  

Science Conference Proceedings (OSTI)

Higher Field Magnets demand higher field materials such as Bi-2212 round superconducting wire. The Bi-2212 wire manufacture process depends on the coil fabrication method and wire insulation material. Considering the wind-and-react method, the coil must unifirmly heated to the melt temperature and uniformly cooled to the solidification temperature. During heat treat cycle for tightly wound coils, the leakage melt from conductor can chemically react with insulation on the conductor and creat short turns in the coils. In this research project, conductor, insulation, and coils are made to systemically study the suitable insulation materials, coil fabrication method, and heat treatment cycles. In this phase I study, 800 meters Bi-2212 wire with 3 different insulation materials have been produced. Best insulation material has been identified after testing six small coils for insulation integrity and critical current at 4.2 K. Four larger coils (2" dia) have been also made with Bi-2212 wrapped with best insulation and with different heattreatment cycle. These coils were tested for Ic in a 6T background field and at 4.2 K. The test result shows that Ic from 4 coils are very close to short samples (1 meter) result. It demonstrates that HTS coils can be made with Bi-2212 wire with best insulation consistently. Better wire insulation, improving coil winding technique, and wire manufacture process can be used for a wide range of high field magnet application including acclerators such as Muon Collider, fusion energy research, NMR spectroscopy, MRI, and other industrial magnets.

Peter K. F. Hwang

2007-10-22T23:59:59.000Z

159

Plant Support Engineering: Guidance for the Replacement of Large Electric Motors at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The purpose of this report is to prepare a primary source of guidance for a project manager who is coordinating a team of plant personnel tasked with replacing a large electric motor. The report provides a generic process that describes interfaces and key steps necessary to ensure that the motor is evaluated and replaced in the most cost-effective and efficient means possible. The report also provides guidance regarding the typical composition of the project team and demonstrates how performance of their...

2010-03-15T23:59:59.000Z

160

Project information  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Information Amistad Project (Texas) Collbran Project (Colorado) Colorado River Storage Project Dolores Project (Colorado) Falcon Project (Texas) Provo River Project (Utah)...

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Beneficial Use of CO Beneficial Use of CO 2 in Precast Concrete Production DE-FE0004285 Yixin Shao, Yaodong Jia Liang Hu McGill University 3H Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation outline * Goals and objectives * Benefits to the program * Project overview * Technical status * Accomplishment to date * Summary 2 Objective Masonry blocks Fiber-cement panels Prefabricated buildings Concrete pipes To develop a carbonation process to replace steam curing in precast concrete production for energy reduction, and carbon storage and utilization. Goals * CO 2 sequestration capacity by cement:

162

B Plant process piping replacement feasibility study  

SciTech Connect

Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace.

Howden, G.F.

1996-02-07T23:59:59.000Z

163

Method of fabricating composite superconducting wire  

DOE Patents (OSTI)

An improvement in the method for preparing composite rods of superconducting alloy and normal metal from which multifilament composite superconducting wire is fabricated by bending longitudinally a strip of normal metal around a rod of superconductor alloy and welding the edges to form the composite rod. After the rods have preferably been provided with a hexagonal cross-sectional shape, a plurality of the rods are stacked into a normal metal extrusion can, sealed and worked to reduce the cross-sectional size and form multifilament wire. Diffusion barriers and high-electrical resistance barriers can easily be introduced into the wire by plating or otherwise coating the faces of the normal metal strip with appropriate materials.

Strauss, Bruce P. (Downers Grove, IL); Reardon, Paul J. (Princeton, NJ); Remsbottom, Robert H. (Middleton, WI)

1977-01-01T23:59:59.000Z

164

LANSCE Wire Scanner System Prototype: Switchyard Test  

Science Conference Proceedings (OSTI)

On November 19, 2011, the beam diagnostics team of Los Alamos National Laboratory's LANSCE accelerator facility conducted a test of a prototype wire scanner system for future deployment within the accelerator's switchyard area. The primary focus of this test was to demonstrate the wire scanner control system's ability to extend its functionality beyond acquiring lower energy linac beam profile measurements to acquiring data in the switchyard. This study summarizes the features and performance characteristics of the electronic and mechanical implementation of this system with details focusing on the test results.

Sedillo, James D [Los Alamos National Laboratory

2012-04-11T23:59:59.000Z

165

Xcel Energy - Farm Re-Wiring Loan Program (Wisconsin) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Re-Wiring Loan Program (Wisconsin) Xcel Energy - Farm Re-Wiring Loan Program (Wisconsin) Eligibility Agricultural Savings For Other Maximum Rebate 23,000 loan maximum Can be...

166

Magnet Wire Plant Resolves PQ Issues  

Science Conference Proceedings (OSTI)

This case study presents an example of a magnet wire plant that was subject to a number of power quality (PQ) disturbances. These disturbances were severe enough to upset several manufacturing lines. A detailed audit revealed that the plant could be hardened to PQ disturbances using simple-to-implement, low-cost techniques.

2007-12-31T23:59:59.000Z

167

Porous coatings from wire mesh for bone implants  

DOE Patents (OSTI)

A method of coating areas of bone implant elements and the resulting implant having a porous coating are described. Preselected surface areas are covered by a preform made from continuous woven lengths of wire. The preform is compressed and heated to assure that diffusion bonding occurs between the wire surfaces and between the surface boundaries of the implant element and the wire surfaces in contact with it. Porosity is achieved by control of the resulting voids between the bonded wire portions.

Sump, Kenneth R. (Richland, WA)

1986-01-01T23:59:59.000Z

168

Nuclear Maintenance Applications Center: Wire Brush and Alternatives Selection Matrix  

Science Conference Proceedings (OSTI)

The purpose of this product is to provide maintenance personnel guidance regarding the suitability of various non-wire filament brush products for different applications in the plant. The objective of the Wire Brush and Alternatives Selection Matrix is to provide recommendations and encourage the use of products in lieu of wire brushes. The recommendations in the matrix were developed based on the testing described EPRI report 1022273, Wire Brush Testing, Procurement and Usage Guide, and recommendations ...

2010-12-23T23:59:59.000Z

169

Transient Melt Pool Response in Wire Feed Additive Manufacturing ...  

Science Conference Proceedings (OSTI)

Symposium, Advanced Materials, Processes and Applications for Additive Manufacturing ... Lubricants in Deposition and Machining of Wire and Arc Additive ...

170

Optimization studies on thermal and mechanical manufacturing processes for multifilament superconducting tape and wire  

E-Print Network (OSTI)

There are many parameters that significantly affect the electrical performance of ceramic-core superconducting composite wire and tapes, which remain ambiguous and require more labor on their optimization. BSCCO 2212 has not been paid the attention and investment it deserves. In this regard, all optimization efforts were made for BSCCO 2223. In our work, a practical and inexpensive manufacturing method, thermally and mechanically optimized for Pb doped BiSrCaCuO 2212 superconducting multifilament (38 filaments) wires and tapes, was successfully employed. Optimized parameters can be classified under material, mechanical (deformation) and heat treatment (thermal) subgroups. Parameters involved with materials included investigation of deformation behavior of two different sheath metals; pure silver and 0.02% magnesia dispersion reinforced silver alloy. Pb doped BiSrCaCuO 2212 ceramic superconductor powder, the other source of material related parameters, was synthesized following the "Thermal Co-decomposition or Wet Mix" method. Fabrication of mono and multifilament wires with Oxide Powder in Tube (OPIT) method followed next. Optimization of drawing deformation was practiced to achieve the best ceramic grain alignment and smoother ceramic powder core/metal sheath interface in order to avoid "sausaging" in wires. Rolling of the wire products into tapes by following different deformation regimes was the other manufacturing stage of the project. Variable and constant reduction-per-pass deformation paths were employed to reveal their effects on our composites with distinct sheath material and filament formation. The search for the best (optimum) heat treatment schedule for our Bi2212 superconductor composites, a modified version of "step solidification partial melting", was employed successfully. A solution through tried recipes for the bubbling problem that occurred with our tapes was also addressed. Electrical performance tests of fully reacted wires were carried out in our laboratory and very promising results were attained.

Basaran, Burak

2003-08-01T23:59:59.000Z

171

Composite wire microelectrode and method of making same  

DOE Patents (OSTI)

A composite wire microelectrode for making electro-chemical measurements, and method of making same, are disclosed. The microelectrode includes an inner conductive sensing wire and an outer tube that is oxidized to form a dielectric, self-healing oxide layer around the sensing wire. 4 figs.

Isaacs, H.S.; Aldykiewicz, A.J. Jr.

1996-12-03T23:59:59.000Z

172

Wire-Extrusion Process Disrupted By Voltage Sags  

Science Conference Proceedings (OSTI)

This PQTN Case Study investigates voltage sags originating from a utility distribution system at a wire-extrusion plant near Cleveland, Ohio that were causing a wire-drawing process to malfunction, resulting in broken tungsten wire and hours of time spent restarting the manufacturing process.

2003-12-31T23:59:59.000Z

173

Composite wire microelectrode and method of making same  

DOE Patents (OSTI)

A composite wire microelectrode for making electro-chemical measurements, and method of making same. The microelectrode includes an inner conductive sensing wire and an outer tube that is oxidized to form a dielectric, self-healing oxide layer around the sensing wire.

Isaacs, Hugh S. (Shoreham, NY); Aldykiewicz, Jr., Antonio J. (Thiells, NY)

1996-12-03T23:59:59.000Z

174

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement  

SciTech Connect

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

Noel Duckwitz

2011-05-01T23:59:59.000Z

175

Replacing Fluorescent Lightbulbs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacing Fluorescent Lightbulbs Replacing Fluorescent Lightbulbs Replacing Fluorescent Lightbulbs July 29, 2012 - 6:37pm Addthis Although fluorescent lightbulbs are generally energy efficient, you can replace them with new, even more efficient bulbs that use better electrodes and coatings than older ones. | Photo courtesy of ©iStockphoto.com/JoLin. Although fluorescent lightbulbs are generally energy efficient, you can replace them with new, even more efficient bulbs that use better electrodes and coatings than older ones. | Photo courtesy of ©iStockphoto.com/JoLin. What does this mean for me? Today's fluorescent light fixtures and bulbs are far more efficient than older ones. You can replace fluorescent bulbs and ballasts with more efficient ones to save money and energy. All fluorescent bulbs contain a very small amount of mercury:

176

Economics of chlorofluorocarbon (CFC) machine replacement. Master's thesis  

Science Conference Proceedings (OSTI)

Continued use of chlorofluorocarbon (CFC) refrigerants may have a severe financial as well as operational impact on the users of air-conditioning and other refrigeration equipment as price increases continue and production is phased out. With production of CFC's coming to a halt on 31 December 1995, the two major refrigerants that have been used in commercial and industrial cooling applications will no longer be available. The phase out of production is a result of national and international agreement that these, as well as other CFC's, are a primary cause of the depletion of the stratospheric ozone layer. To help the user reduce this impact, an economic model based on the time value of money and utilizing replacement analysis was developed. The model is designed to require the user to supply information on his own equipment and on the projected costs of non-CFC replacement equipment. After running the model, the point in time when the existing equipment should be replaced is indicated. By way of example, the model is applied to a centrifugal chiller application. The results of this approach indicate that the increase in CFC costs is only a small factor in the cost of chiller operation. Rather than make a replacement to avoid the high price of refrigerant, the controlling factor is the overall cost of power consumption required to provide the cooling effect.

Rudderow, G.D.

1994-09-01T23:59:59.000Z

177

Non-Wires Alternatives to Achieving Electric Delivery Reliability Goals: Case Study  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) launched the Program 172, Transmission and Distribution Efficiency in a Carbon-Constrained World initiative to focus research on improving the efficiency of the electric delivery system. It included parallel research projects to explore the feasibility of utilities employing non-wires solutions to meeting transmission and distribution (T&D) electric reliability obligations. Traditionally, electric grid investments are made by utilities based on foreca...

2010-12-31T23:59:59.000Z

178

Construction Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

North Execution - (2009 - 2011) North Execution - (2009 - 2011) Construction Project Number 2009 2010 2011 Project Description ANMLPL 0001C 76,675.32 - - Animas-Laplata circuit breaker and power rights CRGRFL 0001C - - 7,177.09 Craig Rifle Bay and transfer bay upgrade to 2000 amps; / Convert CRG RFL to 345 kV out of Bears Ear Sub FGE 0019C - - 39,207.86 Replace 69/25kV transformer KX2A at Flaming Gorge FGE 0020C - - 52,097.12 Flaming Gorge: Replace failed KW2A transformer HDN 0069C 16,638.52 208,893.46 3,704,578.33 Replace failed transformer with KZ1A 250 MVA 230/138kv

179

Chemistry and Metallurgy Research Replacement - Nuclear Facility...  

National Nuclear Security Administration (NNSA)

Chemistry and Metallurgy Research Replacement - Nuclear Facility (CMRR-NF SEIS) | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing...

180

High density harp or wire scanner for particle beam diagnostics  

DOE Patents (OSTI)

A diagnostic detector head harp (23) used to detect and characterize high energy particle beams using an array of closely spaced detector wires (21), typically carbon wires, spaced less than 0.1 cm (0.040 inch) connected to a hybrid microcircuit (25) formed on a ceramic substrate (26). A method to fabricate harps (23) to obtain carbon wire spacing and density not previously available utilizing hybrid microcircuit technology. The hybrid microcircuit (25) disposed on the ceramic substrate (26) connects electrically between the detector wires (21) and diagnostic equipment (37) which analyzes pulses generated in the detector wires (21) by the high energy particle beams.

Fritsche, Craig T. (Overland Park, KS); Krogh, Michael L. (Lee' s Summit, MO)

1996-05-21T23:59:59.000Z

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Microsoft Word - CX-Coulee_Westside_Relay_Replacement_130205.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Roy Slocum Project Manager - TEP-CSB-2 Proposed Action: Coulee-Westside Transfer Trip Replacement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Locations: Grand Coulee, WA and Spokane, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA has entered into a three-party agreement with Bureau of Reclamation (Bureau) and Avista Corporation (Avista) to coordinate the replacement of relays and removal of transfer trip equipment at Avista's Westside Substation and the Bureau's Grand Coulee Switchyard on the Grand Coulee-Westside 230-kilovolt (kV) Transmission Line. Under this agreement, BPA proposes to:

182

Conductor and Shield Wire Inspection and Assessment  

Science Conference Proceedings (OSTI)

With thousands of miles of transmission lines nearing the end of their expected service life, conductor life and reliability are of increasing concern to many utilities. The consequences of conductor failure can be significant and its impacts widespread. ACSR conductors have been identified as the most problematic of all the conductors because the conductor core cannot be assessed visually. ACSR conductors have a steel stranded core to carry the wire tension load and two or more layers of aluminum strand...

2008-12-10T23:59:59.000Z

183

Test of Polymer Electrolyte Membrane Fuel Cell / Uninterruptible Power Supply for Electric Utility Battery Replacement Markets  

Science Conference Proceedings (OSTI)

A sub-scale polymer electrolyte membrane (PEM) fuel cell/capacitor uninterruptible power supply (UPS) was designed and constructed based on previous research. Testing of this sub-scale UPS as a replacement for existing battery systems is documented in this report. The project verified that the PEM fuel cells, coupled with an ultracapacitor, could functionally replace batteries used for emergency power at electric generating stations. Remaining steps to commercialization include continuing market research...

2001-12-18T23:59:59.000Z

184

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the...

185

Replacement solvents for use in chemical synthesis  

DOE Patents (OSTI)

Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

Molnar, Linda K. (Philadelphia, PA); Hatton, T. Alan (Sudbury, MA); Buchwald, Stephen L. (Newton, MA)

2001-05-15T23:59:59.000Z

186

''Water bath'' effect during the electrical underwater wire explosion  

SciTech Connect

The results of a simulation of underwater electrical wire explosion at a current density >10{sup 9} A/cm{sup 2}, total discharge current of {approx}3 MA, and rise time of the current of {approx}100 ns are presented. The electrical wire explosion was simulated using a one-dimensional radiation-magnetohydrodynamic model. It is shown that the radiation of the exploded wire produces a thin conducting plasma shell in the water in the vicinity of the exploding wire surface. It was found that this plasma shell catches up to 30% of the discharge current. Nevertheless, it was shown that the pressure and temperature of the wire material remain unchanged as compared with the idealized case of the electrical wire explosion in vacuum. This result is explained by a 'water bath' effect.

Oreshkin, V. I.; Chaikovsky, S. A.; Ratakhin, N. A.; Grinenko, A.; Krasik, Ya. E. [High Current Electronic Institute SB RAS, Tomsk (Russian Federation); Physics Department, Technion, Haifa 32000 (Israel)

2007-10-15T23:59:59.000Z

187

Microsoft Word - CX-Hatwai-DworshakSpacerReplacementFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 24, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Proposed Action: 2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1899 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: The proposed Hatwai-Dworshak No. 1 500-kV transmission line project is located in Clearwater and Nez Perce counties, Idaho, in BPA's Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project are listed Table 1:

188

Investigating the Use of Ultrasonic Guided Waves for Aging Wire  

E-Print Network (OSTI)

Aging wiring has become a critical issue to DoD, NASA, FAA, and Industry. The problem is that insulation on environmentally aged wire becomes brittle and cracks. This exposes the underlying conductive wire to the potential for short circuits and fire. The difficulty is that techniques to monitor aging wire problems focus on applying electrical sensing techniques that are not very sensitive to the wire insulation. Thus, the development of methods to quantify and monitor aging wire insulation is highly warranted. Measurement of wire insulation stiffness by ultrasonic guided waves is being examined. Initial laboratory tests were performed on a simple model consisting of a solid cylinder and then a solid cylinder with a polymer coating. Experimental measurements showed that the lowest order axisymmetric mode may be sensitive to stiffness changes in the wire insulation. To test this theory, mil-spec wire samples MIL-W-81381, MIL-W-22759/34, and MIL-W-22759/87 (typically found in aircraft) were heat-damaged in an oven, in a range of heating conditions. The samples were 12, 16, and 20 gauge and the heat-damage introduced material changes in the wire-insulation that made the originally flexible insulation brittle and darker in color. Axisymmetric mode phasevelocity increased for the samples that were exposed to heat for longer duration. For example, the phase velocity in the 20-gauge MIL-W-22759/34 wire changed from a baseline value of 2790m/s to 3280m/s and 3530m/s for one-hour exposures to 349 C and 399 C, respectively. Although the heat-damage conditions are not the same as environmental aging, we believe that with further development and refinements, the ultrasonic guided waves can be used to inspect wire-insulation for detrimental environmental aging conditions.

Insulation Assessment Robert; Robert F. Anastasi A; Eric I. Madaras B

2002-01-01T23:59:59.000Z

189

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

190

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

191

Soldering Small Beads to Fine Wires  

SciTech Connect

One method suggested for soldering small beads to fine wires using a torch to heat the bead, flux, and magnesia brick did not prove entirely satisfactory in this case. It was found the brick would draw heat away from the bead and flux at too fast a rate resulting in a poor weld, a rough surface, and an excessive accumulation of flux on the bead. Secondly, removal of the depleted flux presented a problem when the welding was done on the surface of the brick.

Stanton, J. S.

1950-03-01T23:59:59.000Z

192

Information Resources: LED Replacement Lamps: Current Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

incandescent lamps (e.g., A-lamps), and provided an update on ENERGY STAR criteria for LED integral replacement lamps - currently in its second draft. Robert Lingard of Pacific...

193

Marin County- Wood Stove Replacement Rebate Program  

Energy.gov (U.S. Department of Energy (DOE))

The County of Marin has created a rebate program to encourage homeowners to remove or replace non-EPA certified wood-burning heaters (wood stoves and fireplace inserts) with cleaner burning stoves...

194

Corrosion Behavior of Twin Wire Arc Sprayed Inconel Coating  

Science Conference Proceedings (OSTI)

Presentation Title, Corrosion Behavior of Twin Wire Arc Sprayed Inconel Coating. Author(s), Sofiane Djeraf, Yamina Mebdoua, Hadj Lahmar, Rachid Lakhdari.

195

Challenges of Using Copper as a Bonding Wire Material  

Science Conference Proceedings (OSTI)

Due to its malleability and surface properties, gold as a wire material is ideally suited for the bonding process. However, the cost of gold has increased ...

196

Microstructural Evolution in TWIP Steels during Wire Drawing  

Science Conference Proceedings (OSTI)

The results obtained by wire drawing have been compared with those by uniaxial tension and cold rolling. It has been shown that the evolution of texture and ...

197

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide...  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Low-dimensional materials have gained much attention not only because of the nonstop march toward...

198

Control of Wire Rod Physical Properties Like Ultimate Tensile ...  

Science Conference Proceedings (OSTI)

Sep 1, 2001 ... Control of Wire Rod Physical Properties Like Ultimate Tensile Strength and Elongation by Close Monitoring of Rolling Energy Input

199

Characterization of Wire Bonds Sujected to Ultrasonic ... - TMS  

Science Conference Proceedings (OSTI)

May 1, 2007 ... Characterization of Wire Bonds Sujected to Ultrasonic Welding and Thermal Cycling by Anil Saigal, Peterson Silva, Robert Greif and Michael ...

200

The Superelastic Behavior of Ti-Ni Superelastic Wire Rope  

Science Conference Proceedings (OSTI)

The advantages of superelastic wire ropes are better fatigue life, increase bending flexibility and increase responsively. There are few studies of superelastic ...

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

ORNL and SuperPower Sign Superconducting Wire Agreement  

for more efficient transmission of electricity. ... line networks; and increase power-transmission capacity. Second-generation (2G) wires made by

202

Hot Wire Chemical Vapor Deposition with Carbide Filaments ...  

Many of the current industry cells in production have come through NREL, ... One deposition technology utilized at NREL deals with hot wire chemical ...

203

Alliant Energy (Wisconsin Power and Light)- Farm Wiring Financing Program  

Energy.gov (U.S. Department of Energy (DOE))

Alliant Energy (Wisconsin Power & Light) offers a farm wiring financing program to increase farm safety, productivity and efficiency, while decreasing the potential for stray voltage on...

204

Bimetallic steel/aluminum wire for overhead telecommunication lines  

Science Conference Proceedings (OSTI)

for power transmission and overhead telecommunication lines and other .... " Method of manufacture of bimetallic wire for, e.g., trolley-bus cable or rods, n Inven-.

205

Numerical Simulations of Wire and Foil Behaviors under Megaampere...  

National Nuclear Security Administration (NNSA)

2: High Energy Density, Plasmas, Magnetic Fields Numerical Simulations of Wire and Foil Electrical Explosion under Helical EMG Current Drive for Warm Dense Matter Generation S.F....

206

An Updated Assessement of Copper Wire Thefts from Electric Utilities...  

NLE Websites -- All DOE Office Websites (Extended Search)

infrastructure in the United States. This report updates a previously published report on copper wire theft. The combined efforts of electric utilities, lawmakers, scrap metal...

207

Electrical and capacitive methods for detecting degradation in wire insulation.  

E-Print Network (OSTI)

??Motivated by a need within the aerospace industry to detect and characterize degradation in the insulation of onboard wires, this thesis reports testing of several… (more)

Sheldon, Robert Thomas

2012-01-01T23:59:59.000Z

208

Processing of Aluminum Wires and Its Effect on Their Electrical ...  

Science Conference Proceedings (OSTI)

The treated specimens were mechanically tested and their electrical resistivity was measured and compared with pure aluminum wires. The highest electrical ...

209

A replaceable reflective film for solar concentrators  

DOE Green Energy (OSTI)

The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

Not Available

1991-09-01T23:59:59.000Z

210

Electrical Core Transformer for Grid Improvement Incorporating Wire Magnetic Components  

SciTech Connect

The research reported herein adds to the understanding of oil-immersed distribution transformers by exploring and demonstrating potential improvements in efficiency and cost utilizing the unique Buswell approach wherein the unit is redesigned, replacing magnetic sheet with wire allowing for improvements in configuration and increased simplicity in the build process. Exploration of new designs is a critical component in our drive to assure reduction of energy waste, adequate delivery to the citizenry, and the robustness of U.S. manufacturing. By moving that conversation forward, this exploration adds greatly to our base of knowledge and clearly outlines an important avenue for further exploration. This final report shows several advantages of this new transformer type (outlined in a report signed by all of our collaborating partners and included in this document). Although materials development is required to achieve commercial potential, the clear benefits of the technology if that development were a given is established. Exploration of new transformer types and further work on the Buswell design approach is in the best interest of the public, industry, and the United States. Public benefits accrue from design alternatives that reduce the overall use of energy, but it must be acknowledged that new DOE energy efficiency standards have provided some assurance in that regard. Nonetheless the burden of achieving these new standards has been largely shifted to the manufacturers of oil-immersed distribution transformers with cost increasing up to 20% of some units versus 2006 when this investigation was started. Further, rising costs have forced the industry to look closely are far more expensive technologies which may threaten U.S. competitiveness in the distribution transformer market. This concern is coupled with the realization that many units in the nation's grid are beyond their optimal life which suggests that the nation may be headed for an infrastructure crisis that U.S. industry is ill prepared to handle which could further challenge U.S. competitiveness.

Harrie R. Buswell, PhD; Dennis Jacobs, PhD; Steve Meng

2012-03-26T23:59:59.000Z

211

Humidity effects on wire insulation breakdown strength.  

SciTech Connect

Methods for the testing of the dielectric breakdown strength of insulation on metal wires under variable humidity conditions were developed. Two methods, an ASTM method and the twisted pair method, were compared to determine if the twisted pair method could be used for determination of breakdown strength under variable humidity conditions. It was concluded that, although there were small differences in outcomes between the two testing methods, the non-standard method (twisted pair) would be appropriate to use for further testing of the effects of humidity on breakdown performance. The dielectric breakdown strength of 34G copper wire insulated with double layer Poly-Thermaleze/Polyamide-imide insulation was measured using the twisted pair method under a variety of relative humidity (RH) conditions and exposure times. Humidity at 50% RH and below was not found to affect the dielectric breakdown strength. At 80% RH the dielectric breakdown strength was significantly diminished. No effect for exposure time up to 140 hours was observed at 50 or 80%RH.

Appelhans, Leah

2013-08-01T23:59:59.000Z

212

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

213

Project Management Plan (PMP) for Work Management Implementation  

SciTech Connect

The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

SHIPLER, C.E.

2000-01-13T23:59:59.000Z

214

WireGL: a scalable graphics system for clusters  

Science Conference Proceedings (OSTI)

We describe WireGL, a system for scalable interactive rendering on a cluster of workstations. WireGL provides the familiar OpenGL API to each node in a cluster, virtualizing multiple graphics accelerators into a sort-first parallel renderer with a parallel ... Keywords: cluster rendering, parallel rendering, remote graphics, scalable rendering, tiled displays, virtual graphics

Greg Humphreys; Matthew Eldridge; Ian Buck; Gordan Stoll; Matthew Everett; Pat Hanrahan

2001-08-01T23:59:59.000Z

215

Comparison of quantum confinement effects between quantum wires and dots  

E-Print Network (OSTI)

? wire . Si GaAs InAs InP CdSe CdS CdTe ? dot ? dot ? wire ?systems like InP and CdSe. Here, we like to address thesematerials: Si, InP, InAs, GaAs, CdSe, CdS, and CdTe. Unlike

Li, Jingbo; Wang, Lin-Wang

2004-01-01T23:59:59.000Z

216

Review of Polyimide Insulated Wire in Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Because of its toughness and other desirable properties, Kapton insulated wire has been test-qualified for use in nuclear power plants; however, failures of this material in military aircraft have raised safety questions. This report identifies the conditions of proper use and handling that will ensure reliable functioning of the wire under nuclear plant operating and accident conditions.

1991-03-01T23:59:59.000Z

217

Steam Plant Replaces Outdated Coal-Fired System | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steam Plant Replaces Outdated Coal-Fired System Steam Plant Replaces Outdated Coal-Fired System September 1, 2012 - 12:00pm Addthis A new natural gas-fired steam plant will replace...

218

Analysis of Supercooled Liquid Water Measurements Using Microwave Radiometer and Vibrating Wire Devices  

Science Conference Proceedings (OSTI)

A review is made of the theoretical basis for using a vibrating wire to measure supercooled liquid water in clouds. The device consists of a vibrating wire and associated electronics added to radiosondes. The sensing wire that collects ...

Geoffrey E. Hill

1994-10-01T23:59:59.000Z

219

ORNL Publishes Study on Superconducting Wire Performance | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ORNL Publishes Study on Superconducting Wire Performance ORNL Publishes Study on Superconducting Wire Performance ORNL Publishes Study on Superconducting Wire Performance August 23, 2013 - 4:06pm Addthis The Department of Energy's Oak Ridge National Laboratory (ORNL) recently released a new study on advances in superconducting wire technology. A team led by ORNL's Amit Goyal demonstrated that the ability to control nanoscale imperfections in superconducting wires results in materials with excellent and customized performance. The team's findings are published in Nature Publishing Group's Scientific Reports. The full press release and link to the new report are available on ORNL's website. Dr. Goyal, a high temperature superconductivity (HTS) research at ORNL, won the Department's 2011 E.O. Lawrence Award in the inaugural category of

220

Intermetallic alloy welding wires and method for fabricating the same  

DOE Patents (OSTI)

Welding wires for welding together intermetallic alloys of nickel aluminides, nickel-iron aluminides, iron aluminides, or titanium aluminides, and preferably including additional alloying constituents are fabricated as two-component, clad structures in which one component contains the primary alloying constituent(s) except for aluminum and the other component contains the aluminum constituent. This two-component approach for fabricating the welding wire overcomes the difficulties associated with mechanically forming welding wires from intermetallic alloys which possess high strength and limited ductilities at elevated temperatures normally employed in conventional metal working processes. The composition of the clad welding wires is readily tailored so that the welding wire composition when melted will form an alloy defined by the weld deposit which substantially corresponds to the composition of the intermetallic alloy being joined. 4 figs.

Santella, M.L.; Sikka, V.K.

1996-06-11T23:59:59.000Z

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Intermetallic alloy welding wires and method for fabricating the same  

SciTech Connect

Welding wires for welding together intermetallic alloys of nickel aluminides, nickel-iron aluminides, iron aluminides, or titanium aluminides, and preferably including additional alloying constituents are fabricated as two-component, clad structures in which one component contains the primary alloying constituent(s) except for aluminum and the other component contains the aluminum constituent. This two-component approach for fabricating the welding wire overcomes the difficulties associated with mechanically forming welding wires from intermetallic alloys which possess high strength and limited ductilities at elevated temperatures normally employed in conventional metal working processes. The composition of the clad welding wires is readily tailored so that the welding wire composition when melted will form an alloy defined by the weld deposit which substantially corresponds to the composition of the intermetallic alloy being joined.

Santella, Michael L. (Knoxville, TN); Sikka, Vinod K. (Oak Ridge, TN)

1996-01-01T23:59:59.000Z

222

Investigating The Use Of Ultrasound For Evaluating Aging Wiring Insulation  

E-Print Network (OSTI)

This paper reviews our initial efforts to investigate the use of ultrasound to evaluate wire insulation. Our initial model was a solid conductor with heat shrink tubing applied. In this model, various wave modes were identified. Subsequently, several aviation classes of wires (MIL-W81381, MIL-W-22759/34, and MIL-W-22759/87) were measured. The wires represented polyimide and ethylene-tetraflouroethylene insulations, and combinations of polyimide and flouropolymer plastics. Wire gages of 12, 16, and 20 AWG sizes were measured. Finally, samples of these wires were subjected to high temperatures for short periods of time to cause the insulation to degrade. Subsequent measurements indicated easily detectable changes.

Eric I. Madaras; Robert F. Anastasi

2001-01-01T23:59:59.000Z

223

Replacement of charcoal sorbent in the VOST  

SciTech Connect

EPA Method 0030, the Volatile Organic Sampling Train (VOST), for sampling volatile organics from stationary sources, specifies the use of petroleum-base charcoal in the second sorbent tube. Charcoal has proven to be a marginal performer as a sampling sorbent, partly due to inconsistency in analyte recovery. In addition, commercial availability of petroleum charcoal for VOST tubes has been variable. Lack of data on comparability and variability of charcoals for VOST application has created uncertainty when other charcoals are substituted. Five potential sorbent replacements for charcoal in Method 0030 were evaluated along with a reference charcoal. Two of the sorbents tested, Ambersorb XE-340 and Tenax GR, did not perform well enough to qualify as replacements. Three candidates, Anasorb 747, Carbosieve S-III and Kureha Beaded Activated Charcoal, performed adequately, and produced statistically equivalent results. Anasorb 747 appears to be an acceptable replacement for petroleum charcoal, based on a combination of performance, availability, and cost.

Johnson, L.D.; Fuerst, R.G.; Foster, A.L.; Bursey, J.T.

1993-01-01T23:59:59.000Z

224

Smart Wires Demo March 17, 2004 REVISED  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Intelligent Power Infrastructure Consortium Intelligent Power Infrastructure Consortium Smart Wires Dynamically Controllable Grid Assets Prof. Deepak Divan Associate Director, Strategic Energy Institute Director, Intelligent Power Infrastructure Consortium School of Electrical Engineering Georgia Institute of Technology 777 Atlantic Drive NW deepak.divan@ece.gatech.edu Atlanta, GA 2 Power Delivery - Major Challenge for Sustainable Energy * Wind at price parity with natural gas, retail price parity imminent for solar PV. Binding RPS mandates of 10-40% in 27 states. * To meet current reliability standards, new solar/wind plants need energy storage, back-up fossil plants & spinning reserve. * EVs require spinning reserve and back-up generation. * Excessive new T&D buildout with RPS and EVs to meet energy

225

Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuel Alternative Fuel Vehicle Replacement Grants to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle Replacement Grants

226

Further Characterization of New NiTi Wire and Rotary Endodontic ...  

Science Conference Proceedings (OSTI)

Presentation Title, Further Characterization of New NiTi Wire and Rotary ... Higher-resolution transmission electron microscopy examination of M-Wire used to ...

227

Nuclear Maintenance Applications Center: Wire Brush Testing, Procurement, and Usage Guide  

Science Conference Proceedings (OSTI)

Improper design, selection, or use of wire brushes will cause the loss of wire brush filaments and can result in damage to plant equipment and nuclear fuel.

2010-12-23T23:59:59.000Z

228

Annual Stock Assessment - CWT [Coded Wire Tag program] (USFWS), Annual Report 2007.  

DOE Green Energy (OSTI)

In 1989 the Bonneville Power Administration (BPA) began funding the evaluation of production groups of juvenile anadromous fish not being coded-wire tagged for other programs. These groups were the 'Missing Production Groups'. Production fish released by the U.S. Fish and Wildlife Service (FWS) without representative coded-wire tags during the 1980s are indicated as blank spaces on the survival graphs in this report. This program is now referred to as 'Annual Stock Assessment - CWT'. The objectives of the 'Annual Stock Assessment' program are to: (1) estimate the total survival of each production group, (2) estimate the contribution of each production group to fisheries, and (3) prepare an annual report for USFWS hatcheries in the Columbia River basin. Coded-wire tag recovery information will be used to evaluate the relative success of individual brood stocks. This information can also be used by salmon harvest managers to develop plans to allow the harvest of excess hatchery fish while protecting threatened, endangered, or other stocks of concern. All fish release information, including marked/unmarked ratios, is reported to the Pacific States Marine Fisheries Commission (PSMFC). Fish recovered in the various fisheries or at the hatcheries are sampled to recover coded-wire tags. This recovery information is also reported to PSMFC. This report has been prepared annually starting with the report labeled 'Annual Report 1994'. Although the current report has the title 'Annual Report 2007', it was written in fall of 2008 using data available from RMIS that same year, and submitted as final in January 2009. The main objective of the report is to evaluate survival of groups which have been tagged under this ongoing project.

Pastor, Stephen M. [U.S. Fish and Wildlife Service, Columbia River Fisheries Program Office

2009-07-21T23:59:59.000Z

229

Measure Guideline: Window Repair, Rehabilitation, and Replacement  

SciTech Connect

This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

Baker, P.

2012-12-01T23:59:59.000Z

230

Energy Efficient Buffer Cache Replacement Jianhui Yue  

E-Print Network (OSTI)

back to the active state. The transition from a lower power state to a higher one re- quires some significantly increases the en- ergy saving opportunities through DAM overlapping and power state transition replacement algorithms only aim to optimize cache hit rates and do not consider the power status of memory

Zhu, Yifeng

231

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Chart: project timeline - Project Milestones - Budget - Bibliography * Thank you 29 30 Organization Chart * Project team: Purdue University - Dr. Brenda B. Bowen: PI, student...

232

The Effects of a Hydrogen Environment on the Lifetime of Small-Diameter Drift Chamber Anode Wires  

DOE Green Energy (OSTI)

Possible deterioration of anode sense wires used in a hydrogen-filled neutron detector is investigated. Wires were loaded with free weights and put into a wire detector environment. Stainless Steel, Tungsten, and Platinum wires did not break after exposure to charge equivalent to many wire lifetimes. Furthermore, exposure to hydrogen gas caused no noticeable surface degradation or change in wire yield strength.

King, J; Smith, T; Kunkle, J; Castelaz, J; Thomson, S; Burstein, Z; Bernstein, A; Rosenberg, L; Hefner, M

2005-04-29T23:59:59.000Z

233

The Modeling of Vibration Damping in SMA Wires  

SciTech Connect

Through a mathematical and computational model of the physical behavior of shape memory alloy wires, this study shows that localized heating and cooling of such materials provides an effective means of damping vibrational energy. The thermally induced pseudo-elastic behavior of a shape memory wire is modeled using a continuum thermodynamic model and solved computationally as described by the authors in [23]. Computational experiments confirm that up to 80% of an initial shock of vibrational energy can be eliminated at the onset of a thermally-induced phase transformation through the use of spatially-distributed transformation regions along the length of a shape memory alloy wire.

Reynolds, D R; Kloucek, P; Seidman, T I

2003-09-16T23:59:59.000Z

234

Plasmon hybridization in parallel nano-wire systems  

Science Conference Proceedings (OSTI)

We apply the plasmon hybridization method to a double-nano-wire system, providing a simple and intuitive description of the plasmon excitations in the system. We apply the two-center cylindrical coordinate system for mathematical convenience and find an explicit form of the surface plasmon oscillations, in terms of the interaction between the bare plasmon modes of the individual surfaces of the nano-wires. We present numerical results to display how the plasmon excitations of the system depend on nano-wire separation when there is no angular momentum transfer, i.e., when m = 0.

Moradi, Afshin [Department of Nano Science, Kermanshah University of Technology, Kermanshah 67178-63766 (Iran, Islamic Republic of) and Department of Nano Science, Institute for Studies in Theoretical Physics and Mathematics (IPM), Tehran 19395-5531 (Iran, Islamic Republic of)

2011-06-15T23:59:59.000Z

235

Wire bond vibration of forward pixel tracking detector of CMS  

SciTech Connect

Wire bonds of the Forward Pixel (FPix) tracking detectors are oriented in the direction that maximizes Lorentz Forces relative to the 4 Tesla field of the Compact Muon Solenoid (CMS) Detector's magnet. The CMS Experiment is under construction at the Large Hadron Collider at CERN, Geneva, Switzerland. We were concerned about Lorentz Force oscillating the wires at their fundamental frequencies and possibly fracturing or breaking them at their heels, as happened with the CDF wire bonds. This paper reports a study to understand what conditions break such bonds.

Atac, M.; /Fermilab; Gobbi, B.; /Northwestern U.; Kwan, S.; Pischalnikov, Y.; /Fermilab; Spencer, E.; /Northwestern U.; Sellberg, G.; Pavlicek, V.; /Fermilab

2006-10-01T23:59:59.000Z

236

Addressing water vaporization in the vicinity of an exploding wire  

SciTech Connect

The phase state of thin ({approx}1 {mu}m) layer of water adjacent to the surface of rapidly heated thin wire 100{+-}50 {mu}m in radius is analyzed by computer hydrodynamic calculation. It is shown that when heating of a wire to a temperature of 420 deg. C is achieved in less than {approx}500 ns, the trajectory of the phase state is contained in the liquid part of the phase diagram. This suggests additional proof of and an explanation for the absence of shunting plasma discharge in fast underwater electrical wire explosions.

Grinenko, A.; Gurovich, V. Tz.; Krasik, Ya. E.; Dolinsky, Yu. [Physics Department, Technion, 32000 Haifa (Israel); Department of Mechanical Engineering, Ben Gurion University, 84105 Beer-Sheva (Israel)

2006-12-01T23:59:59.000Z

237

Assessment of Proton Deflectometry for Exploding Wire Experiments  

SciTech Connect

This project provides the first demonstration of the application of proton deflectometry for the diagnosis of electromagnetic field topology and current-carrying regions in Z-pinch plasma experiments. Over the course of this project several milestones were achieved. High-energy proton beam generation was demonstrated on the short-pulse high-intensity Leopard laser, (10 Joules in ~350 femtoseconds, and the proton beam generation was shown to be reproducible. Next, protons were used to probe the electromagnetic field structure of short circuit loads in order to benchmark the two numerical codes, the resistive-magnetohydrodynamics (MHD) code, Gorgon, and the hybrid particle-in-cell code, LSP for the interpretation of results. Lastly, the proton deflectometry technique was used to map the magnetic field structure of pulsed-power-driven plasma loads including wires and supersonic jets formed with metallic foils. Good agreement between the modeling and experiments has been obtained. The demonstrated technique holds great promise to significantly improve the understanding of current flow and electromagnetic field topology in pulsed power driven high energy density plasmas. Proton probing with a high intensity laser was for the first time implemented in the presence of the harsh debris and x-ray producing z-pinch environment driven by a mega-ampere-scale pulsed-power machine. The intellectual merit of the program was that it investigated strongly driven MHD systems and the influence of magnetic field topology on plasma evolution in pulsed power driven plasmas. The experimental program involved intense field-matter interaction in the generation of the proton probe, as well as the generation of plasma subjected to 1 MegaGauss scale magnetic fields. The computational aspect included two well-documented codes, in combination for the first time to provide accurate interpretation of the experimental results. The broader impact included the support of 2 graduate students, one at UCSD and one at NTF, who were exposed to both the experimental physics work, the MHD and PIC modeling of the system. A first generation college undergraduate student was employed to assist in experiments and data analysis throughout the project. Data resulting from the research program were broadly disseminated by publication in scientific journals, and presentation at international and national conferences and workshops.

Beg, Farhat Nadeem [University of California San Diego] [University of California San Diego

2013-09-25T23:59:59.000Z

238

Microsoft Word - CX_Maupin-TyghValley_PoleReplacement_FY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2012 , 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Supervisory Civil Engineer - TEP-TPP-1 Proposed Action: Maupin-Tygh Valley #1 Pole Replacement Project Budget Information: Work Order #00297894 PP&A Project No.: 2196 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: Project activities would take place in Wasco County, Oregon, T04S R14E S20 Description of the Proposed Action: BPA proposes to replace one aged and unsound wood pole structure (structure 3/2) on the BPA Maupin-Tygh Valley #1 transmission line. The new structure would be placed in the same location and have the same appearance as the old

239

Exploiting level sensitive latches in wire pipelining  

E-Print Network (OSTI)

The present research presents procedures for exploitation of level sensitive latches in wire pipelining. The user gives a Steiner tree, having a signal source and set of destination or sinks, and the location in rectangular plane, capacitive load and required arrival time at each of the destinations. The user also defines a library of non-clocked (buffer) elements and clocked elements (flip-flop and latch), also known as synchronous elements. The first procedure performs concurrent repeater and synchronous element insertion in a bottom-up manner to find the minimum latency that may be achieved between the source and the destinations. The second procedure takes additional input (required latency) for each destination, derived from previous procedure, and finds the repeater and synchronous element assignments for all internal nodes of the Steiner tree, which minimize overall area used. These procedures utilize the latency and area advantages of latch based pipelining over flip-flop based pipelining. The second procedure suggests two methods to tackle the challenges that exist in a latch based design. The deferred delay padding technique is introduced, which removes the short path violations for latches with minimal extra cost.

Seth, Vikram

2004-12-01T23:59:59.000Z

240

COMMUNITY CHOICE AGGREGATION PILOT PROJECT  

E-Print Network (OSTI)

costs for operation, maintenance, repair, rehabilitation, and replacement of the recommended project Estuary, New Jersey, Liberty State Park estimated average annual cost of the recommended plan is $2 or evaluation of historic properties; the costs of any mitigation activities or actions for historic properties

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

An Updated Assessement of Copper Wire Thefts from Electric Utilities -  

NLE Websites -- All DOE Office Websites (Extended Search)

An Updated Assessement of Copper Wire Thefts from Electric An Updated Assessement of Copper Wire Thefts from Electric Utilities - October 2010 An Updated Assessement of Copper Wire Thefts from Electric Utilities - October 2010 The U.S. Department of Energy (DOE), Office of Electricity Delivery and Energy Reliability monitors changes, threats, and risks to the energy infrastructure in the United States. This report updates a previously published report on copper wire theft. The combined efforts of electric utilities, lawmakers, scrap metal dealers, and local law enforcement have succeeded in reducing the problem. Updated Assessment-Copper-Final October 2010.pdf More Documents & Publications Investigation Letter Report: I11IG002 Semiannual Report to Congress: for the first half of Fiscal Year (FY) 1998 Energy Infrastructure Events and Expansions Year-in-Review 2010

242

Building quantum wires: the long and the short of it  

Science Conference Proceedings (OSTI)

As quantum computing moves closer to reality the need for basic architectural studies becomes more pressing. Quantum wires, which transport quantum data, will be a fundamental component in all anticipated silicon quantum architectures. In this paper, ...

Mark Oskin; Frederic T. Chong; Isaac L. Chuang; John Kubiatowicz

2003-06-01T23:59:59.000Z

243

Alliant Energy (Wisconsin Power and Light) - Farm Wiring Financing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Financing Financing Program Alliant Energy (Wisconsin Power and Light) - Farm Wiring Financing Program < Back Eligibility Agricultural Savings Category Other Appliances & Electronics Commercial Lighting Lighting Maximum Rebate $20,000 Program Info State Wisconsin Program Type Utility Loan Program Rebate Amount Varies Provider Alliant Energy Alliant Energy (Wisconsin Power and Light) offers a farm wiring financing program to increase farm safety, productivity and efficiency, while decreasing the potential for stray voltage on livestock farms. To start, Alliant Energy will inspect the facility for stray voltage and recommend improvements. Loans of up to $20,000 at 3% are available for wiring or efficiency equipment as part of this program. In addition to this program, Alliant-WP&L offers the Farm Wiring Grant

244

Ductile alloy and process for preparing composite superconducting wire  

DOE Patents (OSTI)

An alloy for the commercial production of ductile superconducting wire is prepared by melting together copper and at least 15 weight percent niobium under non-oxygen-contaminating conditions, and rapidly cooling the melt to form a ductile composite consisting of discrete, randomly distributed and orientated dendritic-shaped particles of niobium in a copper matrix. As the wire is worked, the dendritric particles are realigned parallel to the longitudinal axis and when drawn form a plurality of very fine ductile superconductors in a ductile copper matrix. The drawn wire may be tin coated and wound into magnets or the like before diffusing the tin into the wire to react with the niobium. Impurities such as aluminum or gallium may be added to improve upper critical field characteristics.

Verhoeven, John D. (Ames, IA); Finnemore, Douglas K. (Ames, IA); Gibson, Edwin D. (Ames, IA); Ostenson, Jerome E. (Ames, IA)

1983-03-29T23:59:59.000Z

245

Reliability of Wedge Wire Bonds Subjected to Ultrasonic Welding ...  

Science Conference Proceedings (OSTI)

This paper presents the effect of the ultrasonic welding lid attachment process on the reliability and mechanical strength of 1.0 and 1.5 mil gold wedge wire ...

246

Delivery optimization for a make to order custom wire mill  

E-Print Network (OSTI)

In the face of growing competition in the Tantalum business, H.C.Starck's management is minimizing the delivery time for custom-made capacitor-grade tantalum wire products. H.C. Starck, Inc., Newton, Massachusetts faces ...

Slivinskiy, Andrey L

2005-01-01T23:59:59.000Z

247

Baseline vs. Replacement High Bay Lighting Evaluation  

Science Conference Proceedings (OSTI)

Energy efficient lighting has been a means to significant energy savings for many facilities around the world. New developments in fluorescent, induction, LED (light-emitting diode), and plasma lighting technologies have spurred various building managers to replace or retrofit existing lighting fixtures. These advances in lighting sources often allow conservation of electricity, better quality of light, and more flexibility in the control of light. However, these new lighting sources still have ...

2013-11-06T23:59:59.000Z

248

Wire rope superconducting cable for diurnal load leveling SMES  

DOE Green Energy (OSTI)

The design of a wire rope cable for a superconducting magnetic energy storage (SMES) unit is discussed. The superconducting wires in the rope permit the passage of large currents in the relatively small conductors of the windings and hence cause large electromagnetic forces to act on the rope. The diameter of the rope, from a strength point of view, can be considerably reduced by supporting the rope at various points along its length.

Costello, G.A.

1980-01-01T23:59:59.000Z

249

Process for producing fine and ultrafine filament superconductor wire  

DOE Patents (OSTI)

A process for producing a superconductor wire made up of a large number of round monofilament rods is provided for, comprising assembling a multiplicity of round monofilaments inside each of a multiplicity of thin wall hexagonal tubes and then assembling a number of said thin wall hexagonal tubes within an extrusion can and subsequently consolidating, extruding and drawing the entire assembly down to the desired wire size.

Kanithi, Hem C. (15 Briar Ct., Chesire, CT 06410)

1992-01-01T23:59:59.000Z

250

Repeatability of measurements of residential magnetic fields and wire codes  

SciTech Connect

Several epidemiological studies have been based on wire codes (i.e., categories of electrical wiring configurations near residences) or on in-home spot measurements of magnetic flux density (MFD) as surrogates for short- and long-term exposure of children and adults to residential magnetic fields. We used wire code and MFD measurements that were made in 81 Colorado homes in 1985 and again in 1990 to assess their repeatability over periods of 0-24 h and 5 years. These homes, a subset of those lived in by subjects from the case-control study of Savitz et al. [Am J Epidemiol 128:21-38, 1988], were divided into four approximately equally sized groups that were differentiated by wire code and by case-control status. Eight homes were assigned wire codes in 1990 that differed from the 1985 coding of Savitz and colleagues [1988]; of these, seven were coded as high-current configuration (HCC) and one as low-current configuration (LCC) in 1985. Overall, 37 homes were coded as HCC in 1990 compared with 38 homes in 1985. Coding differences were due to differing distance measurements (four homes), differing thick vs. thin categorization of primary-distribution line-conductor sizes (two homes), differing first-span vs. second-span categorization of secondary wires (one home), and physical changes in proximate electrical wiring (one home). Coefficients of correlation between MFD spot measurements that were separated in time by 0-24 h range between 0.70 and 0.90. The coefficient between spot measurements made in 1985 and then again in 1990 is 0.70. These coefficients are similar for HCC and LCC homes and do not depend on whether residential appliances were turned on or off. The data show (at least for the portion of Colorado studied) that residential wire code and, more surprisingly, spot MFD measurements, are fairly reliable over 0-24-h and 5-year periods.

Dovan, T.; Kaune, W.T.; Savitz, D.A. (ENERTECH Consultants, Campbell, CA (United States))

1993-01-01T23:59:59.000Z

251

Process for producing fine and ultrafine filament superconductor wire  

DOE Patents (OSTI)

A process for producing a superconductor wire made up of a large number of round monofilament rods is provided for, comprising assembling a multiplicity of round monofilaments inside each of a multiplicity of thin wall hexagonal tubes and then assembling a number of said thin wall hexagonal tubes within an extrusion can and subsequently consolidating, extruding and drawing the entire assembly down to the desired wire size. 8 figs.

Kanithi, H.C.

1992-02-18T23:59:59.000Z

252

Closed form solutions to simultaneous buffer insertion/sizing and wire sizing  

Science Conference Proceedings (OSTI)

In this paper, we consider the delay minimization problem of an interconnect wire by simultaneously considering buffer insertion, buffer sizing and wire sizing. We consider three cases, namely using no buffer (i.e., wire sizing alone), using a given ... Keywords: buffer insertion, buffer sizing, closed form solution, interconnect optimization, wire sizing

Chris Chu; D. F. Wong

2001-07-01T23:59:59.000Z

253

Correlation of the electrical and space-time characteristics during electrical explosion of wires  

SciTech Connect

The electrical and space-time characteristics during electrical explosion of wires is studied. (AIP)

Litvinenko, V.P.; Koval' , S.V.

1983-04-01T23:59:59.000Z

254

Annual Coded Wire Tag Program; Washington Missing Production Groups, 1994 Annual Report.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) funds the ``Annual Coded Wire Tag Program -- Missing Production Groups for Columbia River Hatcheries`` project. The Washington Department of Fish and Wildlife (WDFW) [formerly the Washington Department of Fisheries (WDF) and the Washington Department of Wildlife (WDW)], Oregon Department of Fish and Wildlife (ODFW) and the United States Fish and Wildlife Service (USFWS) all operate salmon and steelhead rearing programs in the Columbia River basin. The intent of the funding is to coded-wire tag at least one production group of each species at each Columbia Basin hatchery to provide a holistic assessment of survival and catch distribution over time. Data generated by this project contributes to WDFW`s obligations for representative tagging under the Endangered. Species Act (ESA) permit for operating Columbia Basin facilities. WDFW facilities operating outside the Snake River basin are required to have a Section 10, ``Incidental Take`` permit. Consistent with special conditions within this permit, WDFW has now reached it`s objective to tag representative groups from all WDFW Columbia Basin releases.

Fuss, Howard J.; Ashbrook, Charmane; Doty, Daniel (Washington Department of Fish and Wildlife, Olympia, WA)

1994-12-01T23:59:59.000Z

255

Processing and mechanical behavior of hypereutectoid steel wires  

DOE Green Energy (OSTI)

Hypereutectoid steels have the potential for dramatically increasing the strength of wire used in tire cord and in other high strength wire applications. The basis for this possible breakthrough is the elimination of a brittle proeutectoid network that can form along grain boundaries if appropriate processing procedures and alloy additions are used. A review is made of work done by Japanese and other researchers on eutectoid and mildly hypereutectoid wires. A linear extrapolation of the tensile strength of fine wires predicts higher strengths at higher carbon contents. The influence of processing, alloy additions and carbon content in optimizing the strength, ductility and fracture behavior of hypereutectoid steels is presented. It is proposed that the tensile strength of pearlitic wires is dictated by the fracture strength of the carbide lamella at grain boundary locations in the carbide. Methods to improve the strength of carbide grain boundaries and to decrease the carbide plate thickness will contribute to enhancing the ultrahigh strength obtainable in hypereutectoid steel wires. 23 refs., 13 figs., 1 tab.

Lesuer, D.R.; Syn, C.K.; Sherby, O.D.; Kim, D.K.

1996-06-25T23:59:59.000Z

256

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

1993-12-01T23:59:59.000Z

257

Method of fabricating a homogeneous wire of inter-metallic alloy  

DOE Patents (OSTI)

A method for fabricating a homogeneous wire of inter-metallic alloy comprising the steps of providing a base-metal wire bundle comprising a metal, an alloy or a combination thereof; working the wire bundle through at least one die to obtain a desired dimension and to form a precursor wire; and, controllably heating the precursor wire such that a portion of the wire will become liquid while simultaneously maintaining its desired shape, whereby substantial homogenization of the wire occurs in the liquid state and additional homogenization occurs in the solid state resulting in a homogenous alloy product.

Ohriner, Evan Keith (Knoxville, TN); Blue, Craig Alan (Knoxville, TN)

2001-01-01T23:59:59.000Z

258

An opposite view data replacement approach for reducing artifacts due to metallic dental objects  

SciTech Connect

Purpose: To present a conceptually new method for metal artifact reduction (MAR) that can be used on patients with multiple objects within the scan plane that are also of small sized along the longitudinal (scanning) direction, such as dental fillings. Methods: The proposed algorithm, named opposite view replacement, achieves MAR by first detecting the projection data affected by metal objects and then replacing the affected projections by the corresponding opposite view projections, which are not affected by metal objects. The authors also applied a fading process to avoid producing any discontinuities in the boundary of the affected projection areas in the sinogram. A skull phantom with and without a variety of dental metal inserts was made to extract the performance metric of the algorithm. A head and neck case, typical of IMRT planning, was also tested. Results: The reconstructed CT images based on this new replacement scheme show a significant improvement in image quality for patients with metallic dental objects compared to the MAR algorithms based on the interpolation scheme. For the phantom, the authors showed that the artifact reduction algorithm can efficiently recover the CT numbers in the area next to the metallic objects. Conclusions: The authors presented a new and efficient method for artifact reduction due to multiple small metallic objects. The obtained results from phantoms and clinical cases fully validate the proposed approach.

Yazdi, Mehran; Lari, Meghdad Asadi; Bernier, Gaston; Beaulieu, Luc [Department of Electrical Engineering, School of Engineering, Shiraz University, Shiraz 7134851154 (Iran, Islamic Republic of) and Departement de Radio-Oncologie, Ho circumflex tel-Dieu de Quebec, Centre Hospitalier Universitaire de Quebec, 11 Cote du Palais, Quebec, Quebec G1R 2J6 (Canada); Department of Electrical Engineering, School of Engineering, Shiraz University, Shiraz 7134851154 (Iran, Islamic Republic of); Departement de Radio-Oncologie, Ho circumflex tel-Dieu de Quebec, Centre Hospitalier Universitaire de Quebec, 11 Cote du Palais, Quebec, Quebec G1R 2J6 (Canada); Departement de Physique, de Genie Physique et D'optique, Universite Laval, Quebec, Quebec (Canada) and Departement de Radio-Oncologie, Hotel-Dieu de Quebec, Centre Hospitalier Universitaire de Quebec, 11 Cote du Palais, Quebec, Quebec G1R 2J6 (Canada)

2011-04-15T23:59:59.000Z

259

Microsoft Word - CX-FY10_Bingen_UFLS_Relay_Replacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleareance Memorandum Cleareance Memorandum Cherilyn C. Randall Electrical Engineer - TPC-TPP-4 Proposed Action: Replace under frequency load shedding (UFLS) relay at Klickitat County PUD's No. 1 (KPUD) Bingen Substation PP&A Project No: 1720 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose... replace outmoded components. Location: Bingen, Washington. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace an outdated and obsolete UFLS

260

NREL: Technology Transfer - Marine Corps Taps NREL to Help Replace Aging  

NLE Websites -- All DOE Office Websites (Extended Search)

Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013 The 1940s central steam plant at the Marine Corps Recruiting Depot (MCRD) on Parris Island, seven miles south of Beaufort, South Carolina, has far exceeded its projected life and is no longer cost-effective to operate. MCRD staff tasked NREL to help replace this artifact with an efficient biomass cogeneration facility. NREL will assess needs and help develop a request for proposal for designing and constructing the new facility. After the initial site review, the NREL assessment team will: Verify existing resources and biomass costs Optimize facility size and location Model the entire system and generate a process flow diagram Estimate costs and create an economic evaluation

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Microsoft Word - CX Mid Way - Grand View Wood Pole Replacement-KEP.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27, 2010 27, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFWF/Schultz Proposed Action: Replacing 11 wood pole structures on the Midway - Grandview transmission line and 12 wood pole structures on the Grandview - Red Mountain transmission line. PP&A Project No.: 1522 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): * B1.3 Routine maintenance activities for structures, rights-of-way, infrastructures (such as roads), are required to maintain infrastructures in a condition suitable for a facility to be used for its designed purpose. Routine maintenance may result in replacement to the extent that replacement is in kind and is not a substantial upgrade or improvement. In kind

262

NREL: Biomass Research - Marine Corps Taps NREL to Help Replace Aging Steam  

NLE Websites -- All DOE Office Websites (Extended Search)

Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013 The 1940s central steam plant at the Marine Corps Recruiting Depot (MCRD) on Parris Island, seven miles south of Beaufort, South Carolina, has far exceeded its projected life and is no longer cost-effective to operate. MCRD staff tasked NREL to help replace this artifact with an efficient biomass cogeneration facility. NREL will assess needs and help develop a request for proposal for designing and constructing the new facility. After the initial site review, the NREL assessment team will: Verify existing resources and biomass costs Optimize facility size and location Model the entire system and generate a process flow diagram Estimate costs and create an economic evaluation

263

NREL: Technology Deployment - Marine Corps Taps NREL to Help Replace Aging  

NLE Websites -- All DOE Office Websites (Extended Search)

Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013 The 1940s central steam plant at the Marine Corps Recruiting Depot (MCRD) on Parris Island, seven miles south of Beaufort, South Carolina, has far exceeded its projected life and is no longer cost-effective to operate. MCRD staff tasked NREL to help replace this artifact with an efficient biomass cogeneration facility. NREL will assess needs and help develop a request for proposal for designing and constructing the new facility. After the initial site review, the NREL assessment team will: Verify existing resources and biomass costs Optimize facility size and location Model the entire system and generate a process flow diagram Estimate costs and create an economic evaluation

264

Diamond Wire Saw for Precision Machining of Laser Target Components  

SciTech Connect

The fabrication of precision laser targets requires a wide variety of specialized mesoscale manufacturing techniques. The diamond wire saw developed in this study provides the capability to precisely section meso-scale workpieces mounted on the assembly stations used by the Target Fabrication Group. This new capability greatly simplifies the fabrication of many types of targets and reduces the time and cost required to build the targets. A variety of materials are used to fabricate targets, including metals, plastics with custom designed chemical formulas, and aerogels of various densities. The materials are usually provided in the form of small pieces or cast rods that must be machined to the required shape. Many of these materials, such as metals and some plastics, can be trimmed using a parting tool on a diamond turning machine. However, other materials, such as aerogels and brittle materials, cannot be adequately cut with a parting tool. In addition, the geometry of the parts often requires that the workpieces be held in a special assembly station, which excludes the use of a parting tool. In the past, these materials were sectioned using a small, handheld coping saw that used a diamond-impregnated wire as a blade. This miniature coping saw was effective, but it required several hours to cut through certain materials. Furthermore, the saw was guided by hand and often caused significant damage to fragile aerogels. To solve these problems, the diamond wire saw shown in Figure 1 was developed. The diamond wire saw is designed to machine through materials that are mounted in the Target Fabrication Group's benchtop assembly stations. These assembly stations are the primary means of aligning and assembling target components, and there is often a need to machine materials while they are mounted in the assembly stations. Unfortunately, commercially available saws are designed for very different applications and are far too large to be used with the assembly stations. Therefore, a custom diamond wire saw was designed and constructed. The diamond wire saw cuts through workpieces using a continuous loop of diamond-impregnated wire of length 840 mm. The wire loop runs around several idler pulleys and is driven by a simple geared DC motor that rotates at 17 rpm. The linear speed of the wire is 107 inches/minute. The saw is oriented at an angle of 20{sup o} from horizontal, so the operator can view the wire through the cutout at the front end of the saw. When looking through a microscope or camera with a horizontal line of sight, the operator can clearly see the wire as it cuts through the workpiece, as shown in the right side of Figure 1. The saw is mounted on a two-axis stage that allows the operator to align the wire with the workpiece. To cut through the workpiece, the operator drives the wire through the workpiece by turning the feed micrometer. An image of the interior of the diamond wire saw appears in Figure 2. This picture was taken after removing the protective cover plate from the saw.

Bono, M J; Bennett, D W

2005-08-08T23:59:59.000Z

265

Project Accounts  

NLE Websites -- All DOE Office Websites (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

266

Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Vehicle Replacement Vouchers to someone by E-mail Share Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Facebook Tweet about Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Twitter Bookmark Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Google Bookmark Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Delicious Rank Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Digg Find More places to share Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Clean Vehicle Replacement Vouchers The Texas Commission on Environmental Quality administers the AirCheckTexas

267

Solid-State Lighting: Text-Alternative Version: LED Replacements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps to someone by E-mail Share Solid-State Lighting: Text-Alternative Version: LED Replacements for Linear...

268

Solid-State Lighting: LED Replacements for Linear Fluorescent...  

NLE Websites -- All DOE Office Websites (Extended Search)

LED Replacements for Linear Fluorescent Lamps Webcast to someone by E-mail Share Solid-State Lighting: LED Replacements for Linear Fluorescent Lamps Webcast on Facebook Tweet about...

269

Project 244  

NLE Websites -- All DOE Office Websites (Extended Search)

PROJECT PARTNER Advanced Technology Systems, Inc. Pittsburgh, PA PROJECT PARTNERS Ohio University Athens, OH Texas A&M University-Kingsville Kingsville, TX WEBSITES http:...

270

Projects | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

and Conferences Supporting Organizations Supercomputing and Computation Home | Science & Discovery | Supercomputing and Computation | Projects Projects 1-10 of 180 Results Prev...

271

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit...

272

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement  

SciTech Connect

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

Noel Duckwtiz

2011-05-01T23:59:59.000Z

273

Categorical Exclusion Determinations: Advanced Research Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 25, 2012 July 25, 2012 CX-008873: Categorical Exclusion Determination Oregon State University- Natural Gas Self-contained Home Filling Station CX(s) Applied: B3.6 Date: 07/25/2012 Location(s): Oregon, Colorado, Michigan Offices(s): Advanced Research Projects Agency-Energy April 17, 2012 CX-008671: Categorical Exclusion Determination Arizona State University - Cyanobacteria Designed for Solar-Powered Highly Efficient Production of Biofuels - Phase II CX(s) Applied: A9, B3.6 Date: 04/17/2012 Location(s): Arizona, Arizona, Arizona, Minnesota, North Carolina Offices(s): Advanced Research Projects Agency-Energy February 17, 2012 CX-007812: Categorical Exclusion Determination Smart Wire Grid, Inc. - Distributed Power Flow Control Using Smart Wires for Energy Routing CX(s) Applied: A9, B1.7, B3.6

274

Replacement solvents for use in chemical synthesis - Energy ...  

The replacement solvents may be readily recovered from the reaction train using conventional methods. Inventors: Molnar; Linda K. (Philadelphia, PA), ...

275

Extrusion of metal oxide superconducting wire, tube or ribbon  

DOE Patents (OSTI)

A process and apparatus for extruding a superconducting metal oxide composition YBa{sub 2}Cu{sub 3}O{sub 7-x} provides a wire (tube or ribbon) having a cohesive mass and a degree of flexibility together with enhanced electrical properties. Wire diameters in the range of 6--85 mils have been produced with smaller wires on the order of 10 mils in diameter exhibiting enhanced flexibility for forming braided, or multistrand, configurations for greater current carrying capacity. The composition for extrusion contains a polymeric binder to provide a cohesive mass to bind the particles together during the extrusion process with the binder subsequently removed at lower temperatures during sintering. The composition for extrusion further includes a deflocculent, an organic plasticizer and a solvent which also are subsequently removed during sintering. Electrically conductive tubing with an inner diameter of 52 mil and an outer diameter of 87--335 mil has also been produced. Flat ribbons have been produced in the range of 10--125 mil thick by 100--500 mil wide. The superconducting wire, tube or ribbon may include an outer ceramic insulating sheath co-extruded with the wire, tubing or ribbon.

Dusek, J.T.

1990-01-01T23:59:59.000Z

276

Extrusion of metal oxide superconducting wire, tube or ribbon  

DOE Patents (OSTI)

A process for extruding a superconducting metal oxide composition YBa.sub.2 Cu.sub.3 O.sub.7-x provides a wire (tube or ribbon) having a cohesive mass and a degree of flexibility together with enhanced electrical properties. Wire diameters in the range of 6-85 mils have been produced with smaller wires on the order of 10 mils in diameter exhibiting enhanced flexibility for forming braided, or multistrand, configurations for greater current carrying capacity. The composition for extrusion contains a polymeric binder to provide a cohesive mass to bind the particles together during the extrusion process with the binder subsequently removed at lower temperatures during sintering. The composition for extrusion further includes a deflocculent, an organic plasticizer and a solvent which also are subsequently removed during sintering. Electrically conductive tubing with an inner diameter of 52 mil and an outer diameter of 87-355 mil has also been produced. Flat ribbons have been produced in the range of 10-125 mil thick by 100-500 mil wide. The superconducting wire, tube or ribbon may include an outer ceramic insulating sheath co-extruded with the wire, tubing or ribbon.

Dusek, Joseph T. (Lombard, IL)

1993-01-01T23:59:59.000Z

277

First Measurements and Results With a Stretched Wire Test Setup  

Science Conference Proceedings (OSTI)

The LINAC Coherent Light Source [LCLS] is a free electron laser, designed to produce high brilliant X-ray beams using Self Amplified Spontaneous Emission [SASE]. Due to the physics of SASE, the electron beam has to be held very precisely on the same trajectory as the X-ray light beam generated by the undulator magnets. To optimize the SASE output, trajectory deviations between both beams have to be minimized to a few micrometers along the entire undulator section and held stable over the time period between beam-based-alignment processes. Consequently, extremely high position stability of all magnets in the undulator section is required to operate the LCLS successfully. The knowledge of any magnet movement exceeding few micrometers during periods of several weeks is essential for efficient X-ray generation. A well known principle of monitoring transverse component positions along beam lines is the application of stretched wires, associated with suitable wire position sensors and electronics. The particular challenge at LCLS is the required wire system performance in conjunction with the length of the undulator section and the large number of monitors. Verification of system stability and resolution under real conditions is the primary goal of this test setup. A stretched wire test setup has been implemented to gain experience for the final design of a wire system, which will meet the position monitoring requirements in the LCLS undulator section. The report briefly introduces the system's architecture and describes first measurements and results.

Peters, Franz

2010-12-13T23:59:59.000Z

278

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacancy-Induced Nanoscale Wire Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Wednesday, 21 December 2005 00:00 Low-dimensional materials have gained much attention not only because of the nonstop march toward miniaturization in the electronics industry but also for the exotic properties that are inherent in their small size. One approach for creating low-dimensional structures is to exploit the nanoscale or atomic-scale features that exist naturally in the three-dimensional (bulk) form of materials. By this means, a group from the University of Washington has demonstrated a new way of creating one-dimensional nanoscale structures (nanowires) in the compound gallium selenide. In short, ordered lines of structural vacancies in the material stimulate the growth of "one-dimensional" structures less than 1 nanometer in width.

279

Annual Coded Wire Program Missing Production Groups, 1996 Annual Report.  

DOE Green Energy (OSTI)

In 1989 the Bonneville Power Administration (BPA) began funding the evaluation of production groups of juvenile anadromous fish not being coded-wire tagged for other programs. These groups were the ``Missing Production Groups``. Production fish released by the US Fish and Wildlife Service (USFWS) without representative coded-wire tags during the 1980`s are indicated as blank spaces on the survival graphs in this report. The objectives of the ``Missing Production Groups`` program are: to estimate the total survival of each production group, to estimate the contribution of each production group to various fisheries, and to prepare an annual report for all USFWS hatcheries in the Columbia River basin. Coded-wire tag recovery information will be used to evaluate the relative success of individual brood stocks. This information can also be used by salmon harvest managers to develop plans to allow the harvest of excess hatchery fish while protecting threatened, endangered, or other stocks of concern.

Pastor, S.M. [Fish and Wildlife Service, Vancouver, WA (United States). Columbia River Fisheries Program Office

1997-07-01T23:59:59.000Z

280

Wired World-Wide Web Interactive Remote Event Display  

Science Conference Proceedings (OSTI)

WIRED (World-Wide Web Interactive Remote Event Display) is a framework, written in the Java{trademark} language, for building High Energy Physics event displays. An event display based on the WIRED framework enables users of a HEP collaboration to visualize and analyze events remotely using ordinary WWW browsers, on any type of machine. In addition, event displays using WIRED may provide the general public with access to the research of high energy physics. The recent introduction of the object-oriented Java{trademark} language enables the transfer of machine independent code across the Internet, to be safely executed by a Java enhanced WWW browser. We have employed this technology to create a remote event display in WWW. The combined Java-WWW technology hence assures a world wide availability of such an event display, an always up-to-date program and a platform independent implementation, which is easy to use and to install.

De Groot, Nicolo

2003-05-07T23:59:59.000Z

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Strongly coupled copper plasma generated by underwater electrical wire explosion  

Science Conference Proceedings (OSTI)

A number of theoretical approaches to the analysis of the parameters of a discharge channel consisting of strongly coupled plasma generated in the process of underwater electrical wire explosion are presented. The analysis is based on experimental results obtained from discharges employing Cu wire. The obtained experimental data included electrical measurements and optical observations from which information about the dynamics of the water flow was extrapolated. Numerical calculation based on a 1D magnetohydrodynamic model was used to simulate the process of underwater wire explosion. A wide range conductivity model was applied in this calculation and good agreement with a set of experimental data was obtained. A method of determining the average temperature of the discharge channel based on this model and experimental results is proposed, and the limits of this method's applicability are discussed.

Grinenko, A.; Gurovich, V.Tz.; Saypin, A.; Efimov, S.; Krasik, Ya.E.; Oreshkin, V.I. [Physics Department, Technion, 32000 Haifa (Israel); Institute of High Current Electronics, SB RAN, 634055 Tomsk (Russian Federation)

2005-12-15T23:59:59.000Z

282

Analysis of Compact Cylindrical Wire Array Implosions with Brass and also by Alternating Brass and Al wires on the 1-MA COBRA Generator  

SciTech Connect

Implosions from compact cylindrical wire arrays (CCWA) with mid-Z and low-Z wires were carried out on the 1-MA COBRA generator at Cornell University. In particular, the CCWA used either Brass 310 (70% Cu, 30% Zn) wires or a combination of Brass 310 and Al 5056 (95% Al, 5% Mg) wires arranged in an alternating pattern. A total of 16 wires were used on either a 6 or 4 mm diameter array. The diagnostic suite included a bolometer, fast x-ray detectors, a time-integrated spectrometer, and a streak camera. A higher energy output was observed from bolometer measurements when alternating the brass and Al wires compared to using only the brass wires. This study will focus mainly on the spectroscopy of the brass and alternating brass and Al CCWA by applying the non-LTE kinetic models of Cu and Zn to account for the L-shell radiation. The resulting plasma parameters, electron density and electron temperature, will be discussed and compared for the CCWA with only brass wires and alternating brass and Al wires. The simulations with the novel Wire Ablation Dynamics Model that account for wire ablation will be performed to analyze the differences in implosion dynamics of the uniform and alternating compact cylindrical arrays.

Ouart, N. D.; Yilmaz, M. F.; Safronova, A. S.; Kantsyrev, V. L.; Esaulov, A. A.; Williamson, K. M.; Osborne, G. C.; Shrestha, I.; Weller, M. E. [Physics Department, University of Nevada, Reno, NV 89557 (United States); McBride, R. D.; Knapp, P. F.; Bell, K. S.; Pikuz, S. A.; Shelkovenko, T. A.; Greenly, J. B.; Hammer, D. A.; Kusse, B. R. [Cornell University, Ithaca, NY 14853 (United States)

2009-01-21T23:59:59.000Z

283

Microsoft Word - CX-CircuitBreakerReplacementsMultipleSubstationsFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2012 12, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Michael Gilchrist Project Manager - TEP-TPP-1 Proposed Action: Power Circuit Breaker Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.6, Additions and modifications to transmission facilities. Location: Tumwater, Thurston County, WA; Ravensdale, King County, WA; Silver Creek, Lewis County, WA; Shelton, Mason County, WA; Bremerton, Kitsap County, WA; Bandon, Coos County, OR; Toledo, Lincoln County, OR; Wilsonville, Washington County, OR; Gold Beach, Curry County, OR; Stayton, Marion County, OR; Swan Valley, Bonneville County, ID; Moose, Teton County, WY (ID); Gold Creek, Powell County, MT.

284

What is the status of the Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

status of the Project? status of the Project? The first phase of the project was energized on July 20, 2006. It operated flawlessly as an integral part of National Grid's 35-kilovolt network in Albany, serving the equivalent of 25,000 homes. It was taken offline after nine months to begin phase II of the project: replacing a 30-meter section with 2G cable, which will be the world's first use of 2G in any utility device. Phase II of the project was energized on January 8, 2008.

285

Replacing Incandescent Lightbulbs and Ballasts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacing Incandescent Lightbulbs and Ballasts Replacing Incandescent Lightbulbs and Ballasts Replacing Incandescent Lightbulbs and Ballasts July 29, 2012 - 5:16pm Addthis Many incandescent lightbulbs can be replaced with more energy efficient options. | Photo courtesy of ©iStockphoto.com/ClarkandCompany. Many incandescent lightbulbs can be replaced with more energy efficient options. | Photo courtesy of ©iStockphoto.com/ClarkandCompany. What does this mean for me? For the greatest energy efficiency, use new fixtures with new lightbulbs. Replace A-type lightbulbs with more energy-efficient options such as CFLs, LEDs, and energy-saving (halogen) incandescents. Matching replacement lightbulbs to existing fixtures and ballasts can be tricky, especially with older fixtures. Using new fixtures made for new

286

Do You Have Windows That Need Replacing? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Do You Have Windows That Need Replacing? Do You Have Windows That Need Replacing? Do You Have Windows That Need Replacing? August 3, 2012 - 2:11pm Addthis This week, Andrea shared the first part of her two-part story about how she replaced her more than 20-year-old windows with new, energy-efficient ones. Replacing old windows can be a great way to reduce the amount of warm and cool air (depending on the season) is leaking right out of your home. This week, we're wondering: Do you have windows that need replacing, too? Do you have any plans to replace them with newer, more efficient windows? You have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers. E-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov. Addthis Related Articles

287

Header with Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Shock Wave Compression rev060908, 6/14/06, rev 9/8/06 Shock Wave Compression rev060908, 6/14/06, rev 9/8/06 FACT SHEET Rampressor Shock Wave Compressor , DE-FC26-06NT42651 (Ramgen Power Systems, RPS) I. PROJECT PARTICIPANTS A. Prime Participant: Ramgen Power Systems, Inc (RPS) under cooperative Agreement DE-FC26-06NT42651 B. Sub-Award Participants: ASE Technologies (ASE), Manufacturing Resources Inc. (MRI), Geminus Technologies Development (GTD), Steve Kushnick, P.E., Alouette Technology. II. PROJECT DESCRIPTION A. Objective(s): Based on aerospace ramjet technology, Ramgen Power Systems is developing a novel more cost effective compressor concepts (air and carbon dioxide) for support of coal fueled gasification stationary power applications and for potential replacement of the compressor component in gas turbines.

288

Nucla CFB Demonstration Project  

SciTech Connect

This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

Not Available

1990-12-01T23:59:59.000Z

289

Microsoft Word - CX-Drummond-MacksInn-WoodPoleReplacementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2012 29, 2012 REPLY TO ATTN OF: KEP-CELILO SUBJECT: Environmental Clearance Memorandum Mark Hadley Lineman Foreman III - TFIF-Idaho Falls Proposed Action: Wood pole replacements along the Drummond-Macks Inn, Macks Inn- Madison, and Swan Valley-Teton 115-kilovolt (kV) transmission line rights-of-way. PP&A Project Number: 2486 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The project area is located in Bonneville Power Administration's (BPA) Idaho Falls District. Project locations are listed below: Project Location Township Range Section(s) County Line Name Structures Use Ownership 3N 44E 28 Teton Swan Valley - Teton 10/6 Forest Forest Service 14S 5E 19 Fremont

290

Microsoft Word - CX-Satsop-Aberdeen_Tower-Replacement_FY10_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Replacement of twenty 22-L structures on the Satsop-Aberdeen No. 2 230-kV Transmission Line PP&A Project No.: 1704 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective...are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The Project is located in Gray's Harbor County, Washington between the towns of Aberdeen and Central Park, Washington. The Project is located in the following sections:

291

Microsoft Word - CX-Drummond-MacksInn_WoodPoleReplacementFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10, 2012 10, 2012 REPLY TO ATTN OF: KEP-CELILO SUBJECT: Environmental Clearance Memorandum Mark Hadley Lineman Foreman III - TFIF-Idaho Falls Proposed Action: Wood pole replacements along the Drummond-Macks Inn, Macks Inn- Madison, and Targhee Tap 115-kV transmission line rights-of-way. PP&A Project Number: 2191 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... Location: The project area is located in Bonneville Power Administration's (BPA) Idaho Falls District. Project locations are listed below: Project Location Township Range Section(s) County Line Name Structures Use Ownership 4N 45E 11 Teton Targhee Tap 8/8 Agriculture Private 14N 44E 22 Fremont Macks Inn- Madison

292

Finite Element Simulation of Residual Stresses in Thermo-coupled Wire Drawing Process  

Science Conference Proceedings (OSTI)

The objective of this paper is to calculate residual stress in drawn wire taking into account induced temperature due to plastic dissipation energy. Finite element analysis (FEA) for the simulation of wire drawing is applied. The general purpose FEA ...

R. Iankov; A. Van Bael; P. Van Houtte

2000-06-01T23:59:59.000Z

293

The Effect of Prongs in the Measurement of Atmospheric Turbulence with Fine-Wire Resistance Transducers  

Science Conference Proceedings (OSTI)

The response of the fine-wire resistance temperature transducer was analyzed including the effects of (i) conducive heat transfer between wire and the supporting prong and (ii) a thermal boundary layer, which can form around the prongs especially ...

V. P. Singh; F. Eaton; R. Rubio

1992-04-01T23:59:59.000Z

294

THE EFFECT OF PRIVATE WIRE LAWS ON DEVELOPMENT OF COMBINED HEAT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE EFFECT OF PRIVATE WIRE LAWS ON DEVELOPMENT OF COMBINED HEAT AND POWER FACILITIES THE EFFECT OF PRIVATE WIRE LAWS ON DEVELOPMENT OF COMBINED HEAT AND POWER FACILITIES Section...

295

STUDY OF THE EFFECT OF PRIVATE WIRE LAWS ON DEVELOPMENT OF COMBINED...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STUDY OF THE EFFECT OF PRIVATE WIRE LAWS ON DEVELOPMENT OF COMBINED HEAT AND POWER FACILITIE STUDY OF THE EFFECT OF PRIVATE WIRE LAWS ON DEVELOPMENT OF COMBINED HEAT AND POWER...

296

First Test Results of the New LANSCE Wire Scanner  

SciTech Connect

The Beam Diagnostics and Instrumentation Team (BDIT) at Los Alamos National Laboratory's LANSCE facility is presently developing a new and improved wire scanner diagnostics system controlled by National Instrument's cRIO platform. This paper describes the current state of development of the control system along with the results gathered from the latest actuator motion performance and accelerator-beam data acquisition tests.

Sedillo, James Daniel [Los Alamos National Laboratory

2011-01-01T23:59:59.000Z

297

Leaching Studies for Metals Recovery from Waste Printed Wiring ...  

Science Conference Proceedings (OSTI)

Presentation Title, Leaching Studies for Metals Recovery from Waste Printed Wiring ... of the Chemical Changes and Surface Properties of Carbonated Waste Cement ... Flux for Basic Oxygen Steel Making Using Waste Oxides of Steel Plant ... Heat Treatment of Black Dross for the Production of a Value Added Material - A

298

A Laser-Wire System at the ATF Extraction Line  

Science Conference Proceedings (OSTI)

A new laser-wire (LW) system has been installed at the ATF extraction line at KEK, Tsukuba. The system aims at a micron-scale laser spot size and employs a mode-locked laser system. The purpose-built interaction chamber, light delivery optics, and lens systems are described, and the first results are presented.

Boogert, S.T.; Blair, G.; Boorman, G.; Bosco, A.; Deacon, L.; Driouichi, C.; Karataev, P.; /Royal Holloway, U. of London; Kamps, T.; /BESSY, Berlin; Delerue, N.; Dixit, S.; Foster, B.; Gannaway, F.; Howell, D.F.; Qureshi, M.; Reichold, A.; Senanayake, R.; /Oxford U.; Aryshev, A.; Hayano, H.; Kubo, K.; Terunuma, N.; Urakawa, J.; /KEK, Tsukuba /Liverpool U. /Cockcroft Inst. Accel. Sci. Tech. /SLAC

2007-02-12T23:59:59.000Z

299

EAC Recommendations for DOE Action Regarding Non-Wires Solutions - October 17, 2012  

Energy.gov (U.S. Department of Energy (DOE))

EAC Recommendations for DOE Action Regarding Non-Wires Solutions, approved at the October 15-16, 2012 EAC Meeting.

300

Science Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne Argonne Science Project Ideas! Our Science Project section provides you with sample classroom projects and experiments, online aids for learning about science, as well as ideas for Science Fair Projects. Please select any project below to continue. Also, if you have an idea for a great project or experiment that we could share, please click our Ideas page. We would love to hear from you! Science Fair Ideas Science Fair Ideas! The best ideas for science projects are learning about and investigating something in science that interests you. NEWTON has a list of Science Fair linkd that can help you find the right topic. Toothpick Bridge Web Sites Toothpick Bridge Sites! Building a toothpick bridge is a great class project for physics and engineering students. Here are some sites that we recommend to get you started!

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Control console replacement at the WPI Reactor  

SciTech Connect

With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduate use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.

1992-01-01T23:59:59.000Z

302

Polymers replace glass in Nova fuel capsules  

SciTech Connect

The glass fuel-capsule designs used in previous laser-fusion research are not adaptable to the implosion-physics requirements of Nova and other more powerful laser facilities that may be available in the future. As one tries to learn more about the physics of high-density compression, it becomes increasingly important to replace the glass with lower-Z material. Accordingly, the authors have shut down the high-temperature drop-tower furnaces they used to make glass capsules, and they are focusing all their efforts on developing new techniques for making polymer capsules. These capsules are ten times larger in diameter than the glass capsules used in the early days of laser-fusion research, but they are still only one-tenth as large as a high-gain capsule must be. The polymer capsules will be used in classified indirect-drive targets. This article describes how the decisions were made on which polymers to use in the NOVA fuel capsules, the techniques explored, and the properties of the prototype capsules.

Burnham, A.K.

1986-01-01T23:59:59.000Z

303

Alternatives to proposed replacement production reactors  

SciTech Connect

To insure adequate supplies of plutonium and tritium for defense purposes, an independent evaluation was made by Los Alamos National Laboratory of the numerous alternatives to the proposed replacement production reactors (RPR). This effort concentrated on the defense fuel cycle operation and its technical implications in identifying the principal alternatives for the 1990s. The primary options were identified as (1) existing commercial reactors, (2) existing and planned government-owned facilities (not now used for defense materials production), and (3) other RPRs (not yet proposed) such as CANDU or CANDU-type heavy-water reactors (HWR) for both plutonium and tritium production. The evaluation considered features and differences of various options that could influence choice of RPR alternatives. Barring a change in the US approach to civilian and defense fuel cycles and precluding existing commercial reactors at government-owned sites, the most significant alternatives were identified as a CANDU-type HWR at Savannah River Plant (SRP) site or the Three Mile Island commercial reactor with reprocessing capability at Barnwell Nuclear Fuel Plant and at SRP.

Cullingford, H.S.

1981-06-01T23:59:59.000Z

304

Beam profile measurement with flying wires at the Fermilab Recycler Ring  

Science Conference Proceedings (OSTI)

Flying wires were installed at the Fermilab Recycler Ring for transverse beam profile measurement for both proton and antiproton beams. The following note describes the system configuration, calibration and resolution of the flying wire system, interactions between the wires and the beam, as well as analysis of the transverse beam profile in the presence of a stochastic cooling system.

Carcagno, R.; Pishchalnikov, Yu.; Krider, J.; Hu, M.; Lorman, E.; Marchionni, A.; Pordes, S.; Wilson, P.; Zagel, J.; /Fermilab

2005-05-01T23:59:59.000Z

305

Evaluation of the Effect of LOCA Testing on Polyimide Insulated Wire Subjected to Bending: Volume 2  

Science Conference Proceedings (OSTI)

Due in part to mishandling and improper installation, polyimide insulated wire has exhibited degradation in some military aircraft and power plant applications. This report presents the results of a Rochester Gas & Electric (RG&E) test program to determine the effects of bending on aged polyimide lead wire and subsequent performance of this wire during a nuclear plant design basis accident.

1998-05-19T23:59:59.000Z

306

Replacement-1 Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Area: Replacement Energy System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-1 Rate Schedule More Documents & Publications Replacement-3 Wholesale Power Rate Schedule

307

Bio-based ethylene able to replace petroleum as a ...  

Biomass and Biofuels Bio-based ethylene able to replace petroleum as a feedstock National Renewable Energy Laboratory. Contact NREL About This ...

308

Replace Kilogram Artifact Now With Definition Based on ...  

Science Conference Proceedings (OSTI)

Replace Kilogram Artifact Now With Definition Based on Nature, Experts Say. ... “This started out as a study of the effects of redefining the kilogram. ...

2010-10-05T23:59:59.000Z

309

Solid Oxide Fuel Cells (SOFC) as Military APU Replacements  

NLE Websites -- All DOE Office Websites (Extended Search)

Division Propulsion Directorate Air Force Research Laboratory Solid Oxide Fuel Cells (SOFC) as Military APU Replacements Cleared For Public For Public Release: 88ABW-2010-0196 2...

310

Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

311

Program on Technology Innovation: Five-Wire Feasibility on Con Edison's Distribution Systems  

Science Conference Proceedings (OSTI)

The feasibility of a five-wire distribution system has gained interest in recent years. The five-wire distribution system features an isolated neutral that carries unbalanced load current. The main advantages of the five-wire distribution system include lower stray voltage and magnetic fields and easier detection of high-impedance faults. Under normal conditions, the five-wire design operates very similar to the four-wire design with one major exception all the return current is confined to the neutral t...

2006-09-05T23:59:59.000Z

312

Training survey -- educational profile for Hanford HANDI 2000 project  

Science Conference Proceedings (OSTI)

Fluor Daniel Hanford, Inc. (FDH) is currently adopting streamlined business processes through integrated software solutions. Replacing the legacy software (current/replacement systems, attached) also avoids significant maintenance required to resolve Year 2000 issues. This initiative is being referred to as `HANDI 2000`. The software being implemented in the first phase of this project includes Indus International`s PASSPORT Software, Peoplesoft and Primavera P3 Software. The project, which encompasses all the system replacements that will occur, has been named `HANDI 2000.` The PASSPORT applications being implemented are Inventory Management, Purchasing, Contract Management, Accounts Payable, and MSDS (Material Safety Data Sheets).

Wilson, D.

1998-08-25T23:59:59.000Z

313

Microsoft Word - CX-EllensburgTLMDistrictFY11WoodPoleReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clearance Memorandum Clearance Memorandum Terry Kugler Lineman Foreman III - TFWF-Schultz Joe Lauer Line Foreman I - TFWF-Schultz Proposed Action: Wood pole replacement and minor access road maintenance along portions of the Columbia-Valhalla #1 and #2 transmission line rights-of-way. PP&A Project No: 1851 (Columbia-Valhalla #1), 1852 (Columbia-Valhalla #2) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project area is located in Douglas and Chelan counties, Washington. Project

314

Microsoft Word - CX-SpokaneDistrictWoodPoleReplacementsFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2013 1, 2013 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Amanda Williams Project Manager - TEP-TPP-1 Proposed Action: 2013 Spokane District Wood Pole Replacement Projects PP&A Project No.: 2131 (Albeni Falls-Sand Creek No. 1), 2132 (Bronx-Sand Creek No. 1), 2492 (Albeni Falls-Pine Street No. 1), 2133 (Bell-Boundary No. 3), 2134 (Bell-Addy No. 1), 2135 (Bell-Trentwood No. 1), 2136 (Bell-Trentwood No. 2), 2137 (Libby-Bonners Ferry No. 1), 2493 (Boundary-Nelway #1), 2494 (Colville-Boundary #1), 1547 (Four Lakes Tap), 2138 (Green Bluff Tap), 2495 (Sand Creek-Bonners Ferry No. 1 and No. 2), and 1929 (Spirit Tap) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance

315

Microsoft Word - CX-NorthBonneville75-4ReplacementWenatcheeFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR/Pasco KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: North Bonneville-Midway No. 1 Tower 75/4 Replacement PP&A Project No.: 2410 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: The work associated with this project will take place in the areas shown in the table below: Transmission Line/ROW Structure # Township Range Section County, State North Bonneville- Midway #1 75/4 6N 17E 14, 23 Klickitat, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace tower 75/4 on the North Bonneville-Midway No. 1 230-kilovolt (kV) transmission line to ensure the continued safe and

316

Microsoft Word - CX-Pearl-Marion-Tower-6-2-Replace_FY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: Pearl-Marion No.1 Tower 6/2 replacement project PP&A Project No.: PP&A 2147, WO# 00296634, Task 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Canby, Clackamas County, Oregon Township 3 South, Range 1 East, Section 19 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace a single tower (6/2) on the existing Pearl-Marion No. 1 500-kilovolt (kV) transmission line. Tower 6/2 is located along the Molalla River where natural river channel movement and continued stream bank erosion

317

Microsoft Word - CX-FY10_Ross-VanShip_Wood_Pole_Replacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clearance Memorandum Clearance Memorandum Troy Dalrymple Lineman Foreman I - TFVK-LMT Proposed Action: Wood pole replacement of Ross-Vancouver Shipyard No. 1, Structure 2/3 in Fog Chamber Dump Area #2 PP&A Project No: 1721 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: Ross Complex, Vancouver, WA. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors) on

318

Microsoft Word - CX-Monroe-Snohomish-ExpandedConductorReplacement_FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 13, 2013 June 13, 2013 REPLY TO ATTN OF: KEPR-Covington SUBJECT: Environmental Clearance Memorandum Frank Weintraub Mechanical Engineer - TEP-TPP-1 Proposed Action: Replacement of expanded conductor from Bonneville Power Administration's (BPA) Monroe Substation to structure 2/1 on the Monroe-Snohomish transmission line PP&A Project No.: 2682 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions/ modifications to transmission facilities Location: Snohomish County, Washingto.n, in BPA's Snohomish District Proposed by: BPA Description of the Proposed Action: BPA proposes to replace 2.5 inch expanded conductor from Monroe Substation to structure 2/1 on the Monroe-Snohomish 230-kilovolt transmission

319

Microsoft Word - CX-UnderwoodTapStructureReplacementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-Celilo SUBJECT: Environmental Clearance Memorandum Scott Williams Line Foreman III - TFDF-The Dalles Proposed Action: Structure replacement and access road maintenance on Bonneville Power Administration's (BPA) Underwood Tap transmission line PP&A Project No.: 2683 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Skamania County, Washington Line Corridor Structures TRS County, State Underwood Tap 115-kV Line 26/12, 26/13 and 26/14 3N, 10E, Section 15 Skamania, Washington Proposed by: BPA Description of the Proposed Action: BPA proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the

320

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Wire Making Techniques - HTS Coated Conductors - Fact Sheet  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rolling Assisted Biaxially Textured Substrates (RABiTS Rolling Assisted Biaxially Textured Substrates (RABiTS TM ) coated conductors, characterized by their low cost and simple architecture, promise to meet industry price and performance targets. Introduction Since the discovery of high-temperature superconductors (HTS), notably YBa 2 Cu 3 O 7 (YBCO), researchers at the U.S. Department of Energy's (DOE) national laboratories have searched for ways to manufacture affordable flexible wires with high current density. One of the chief obstacles to the manufacture of commercial lengths of YBCO wire has been the phenomenon of weak links, which exist where current crosses a non-superconducting region such as a grain boundary. By aligning grains carefully, low angle boundaries between superconducting grains are assured, which

322

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Low-dimensional materials have gained much attention not only because of the nonstop march toward miniaturization in the electronics industry but also for the exotic properties that are inherent in their small size. One approach for creating low-dimensional structures is to exploit the nanoscale or atomic-scale features that exist naturally in the three-dimensional (bulk) form of materials. By this means, a group from the University of Washington has demonstrated a new way of creating one-dimensional nanoscale structures (nanowires) in the compound gallium selenide. In short, ordered lines of structural vacancies in the material stimulate the growth of "one-dimensional" structures less than 1 nanometer in width.

323

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Low-dimensional materials have gained much attention not only because of the nonstop march toward miniaturization in the electronics industry but also for the exotic properties that are inherent in their small size. One approach for creating low-dimensional structures is to exploit the nanoscale or atomic-scale features that exist naturally in the three-dimensional (bulk) form of materials. By this means, a group from the University of Washington has demonstrated a new way of creating one-dimensional nanoscale structures (nanowires) in the compound gallium selenide. In short, ordered lines of structural vacancies in the material stimulate the growth of "one-dimensional" structures less than 1 nanometer in width.

324

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Low-dimensional materials have gained much attention not only because of the nonstop march toward miniaturization in the electronics industry but also for the exotic properties that are inherent in their small size. One approach for creating low-dimensional structures is to exploit the nanoscale or atomic-scale features that exist naturally in the three-dimensional (bulk) form of materials. By this means, a group from the University of Washington has demonstrated a new way of creating one-dimensional nanoscale structures (nanowires) in the compound gallium selenide. In short, ordered lines of structural vacancies in the material stimulate the growth of "one-dimensional" structures less than 1 nanometer in width.

325

PARALLEL ION BEAM PROFILE SCAN USING LASER WIRE  

Science Conference Proceedings (OSTI)

We report on the world s first experiment of a parallel profile scan of the hydrogen ion (H-) beam using a laser wire system. The system was developed at the superconducting linac of the Spallation Neutron Source (SNS) accelerator complex. The laser wire profile scanner is based on a photo-detachment process and therefore can be conducted on an operational H- beam in a nonintrusive manner. The parallel profile scanning system makes it possible to simultaneously measure profiles of the 1-MW neutron production H- beam at 9 different locations of the linac by using a single light source. This paper describes the design, optical system and software platform development, and measurement results of the parallel profile scanning system.

Liu, Yun [ORNL; Aleksandrov, Alexander V [ORNL; Huang, Chunning [ORNL; Long, Cary D [ORNL; Dickson, Richard W [ORNL

2013-01-01T23:59:59.000Z

326

Dissipation in a Quantum Wire: Fact and Fantasy  

Science Conference Proceedings (OSTI)

Where, and how, does energy dissipation of electrical energy take place in a ballistic wire? Fully two decades after the advent of the transmissive phenomenology of electrical conductance, this deceptively simple query remains unanswered. We revisit the quantum kinetic basis of dissipation and show its power to give a definitive answer to our query. Dissipation leaves a clear, quantitative trace in the non-equilibrium current noise of a quantum point contact; this signature has already been observed in the laboratory. We then highlight the current state of accepted understandings in the light of well-known yet seemingly contradictory measurements. The physics of mesoscopic transport rests not in coherent carrier transmission through a perfect and dissipationless metallic channel, but explicitly in their dissipative inelastic scattering at the wire's interfaces and adjacent macroscopic leads.

Das, Mukunda P. [Department of Theoretical Physics, IAS, Australian National University, Canberra, ACT 0200 (Australia); Green, Frederick [School of Physics, University of New South Wales, Sydney, NSW 2052 (Australia)

2008-10-23T23:59:59.000Z

327

Wrapping process for fabrication of A-15 superconducting composite wires  

DOE Patents (OSTI)

A method for fabricating superconducting wires wherein a billet of copper containing filaments of niobium or vanadium is rolled to form a strip which is wrapped about a tin-alloy core to form a composite. The alloy is a tin-copper alloy for niobium filaments and a gallium-copper alloy for vanadium filaments. The composite is then drawn down to a desired wire size and heat treated. During the heat treatment process, the tin in the bronze reacts with the niobium to form the superconductor niobium tin. In the case where vanadium is used, the gallium in the gallium bronze reacts with the vanadium to form the superconductor vanadium gallium. This new process eliminates the costly annealing steps, external tin plating and drilling of bronze ingots required in a number of prior art processes.

Suenaga, M.; Klamut, C.J.; Luhman, T.S.

1980-08-15T23:59:59.000Z

328

Conveyorized Photoresist Stripping Replacement for Flex Circuit Fabrication  

SciTech Connect

A replacement conveyorized photoresist stripping system was characterized to replace the ASI photoresist stripping system. This system uses the qualified ADF-25c chemistry for the fabrication of flex circuits, while the ASI uses the qualified potassium hydroxide chemistry. The stripping process removes photoresist, which is used to protect the copper traces being formed during the etch process.

Megan Donahue

2009-02-24T23:59:59.000Z

329

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

330

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

331

Project 364  

NLE Websites -- All DOE Office Websites (Extended Search)

765-494-5623 lucht@purdue.edu DEVELOPMENT OF NEW OPTICAL SENSORS FOR MEASUREMENT OF MERCURY CONCENTRATIONS, SPECIATION, AND CHEMISTRY Project Description The feasibility of...

332

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State...

333

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

334

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

335

Project 283  

NLE Websites -- All DOE Office Websites (Extended Search)

NJ 07039 973-535 2328 ArchieRobertson@fwc.com Sequestration ADVANCED CO 2 CYCLE POWER GENERATION Background This project will develop a conceptual power plant design...

336

Project 197  

NLE Websites -- All DOE Office Websites (Extended Search)

will bring economic value to both the industrial customers and to the participating companies. * Complete project by June 2006. Accomplishments A ceramic membrane and seal...

337

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS Pittsburgh,...

338

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Interdisciplinary Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford...

339

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for...

340

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

* Concrete products in this project * Standard 8" concrete blocks * Standard 4' x 8' fiber-cement boards CO 2 The Goals * Maximizing carbon uptake by carbonation (at least...

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Evaluating Potential Groundwater Impacts and Natural Geochemical...

342

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date...

343

Project 252  

NLE Websites -- All DOE Office Websites (Extended Search)

Stanford Global Climate Energy Project Terralog Technologies TransAlta University of Alaska Fairbanks Washington State Department of Natural Resources Western Interstate...

344

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

research partnership to improve the understanding of CO 2 within coal and shale reservoirs. 2 2 3 Presentation Outline * Program Goal and Benefits Statement * Project...

345

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

mechanistic insights 5 Project Overview: Scope of work * Task 1 - Pipeline and Casing Steel Corrosion Studies * Evaluate corrosion behavior of pipeline steels in CO 2 mixtures...

346

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project Program Goals * Technical...

347

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

* This project pinpoints the critical catalyst features necessary to promote carbon dioxide conversion to acrylate, validate the chemical catalysis approach, and develop an...

348

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources...

349

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number...

350

Near net shape processing of continuous lengths of superconducting wire  

DOE Patents (OSTI)

A system and method for mechanically forming a ceramic superconductor product. A system for making the ceramic superconductor includes a metallic channel portion having a cross section for receiving a ceramic superconductor powder, a roll to mechanically reduce the channel cross section and included superconductor powder and a cap portion welded to the channel portion using a localized high energy source. The assembled bar is then mechanically reduced to form a tape or wire end product.

Danyluk, Steven (Atlanta, GA); McNallan, Michael (Oak Park, IL); Troendly, Robert (St. Charles, IL); Poeppel, Roger (Glen Ellyn, IL); Goretta, Kenneth (Downer Grove, IL); Lanagan, Michael (Woodridge, IL)

1997-01-01T23:59:59.000Z

351

Replacing Incandescent Lightbulbs and Ballasts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Incandescent Lightbulbs and Ballasts Incandescent Lightbulbs and Ballasts Replacing Incandescent Lightbulbs and Ballasts July 29, 2012 - 5:16pm Addthis Many incandescent lightbulbs can be replaced with more energy efficient options. | Photo courtesy of ©iStockphoto.com/ClarkandCompany. Many incandescent lightbulbs can be replaced with more energy efficient options. | Photo courtesy of ©iStockphoto.com/ClarkandCompany. What does this mean for me? For the greatest energy efficiency, use new fixtures with new lightbulbs. Replace A-type lightbulbs with more energy-efficient options such as CFLs, LEDs, and energy-saving (halogen) incandescents. Matching replacement lightbulbs to existing fixtures and ballasts can be tricky, especially with older fixtures. Using new fixtures made for new lightbulbs gives you the greatest energy savings, reliability, and

352

Energy Replacement Generation Tax Exemption | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacement Generation Tax Exemption Replacement Generation Tax Exemption Energy Replacement Generation Tax Exemption < Back Eligibility Commercial Industrial Local Government Residential Savings Category Water Buying & Making Electricity Bioenergy Wind Maximum Rebate None Program Info Start Date 01/01/2008 (retroactively effective) State Iowa Program Type Corporate Exemption Rebate Amount 100% exemption for self-generators, landfill gas and wind Reduced rate for large hydro Provider Iowa Department of Revenue Iowa imposes a replacement generation tax of 0.06 cents ($0.0006) per kilowatt-hour (kWh) on various forms of electricity generated within the state. This tax is imposed in lieu of a property tax on generation facilities. Under the Energy Replacement Generation Tax Exemption, the following

353

Electrical Equipment Replacement: Energy Efficiency versus System Compatibility  

E-Print Network (OSTI)

Electrical equipment components are replaced every day because of failure, obsolescence, or upgrade. Because of technological gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage end users to select the most energy efficient equipment when replacing motors, motor drives, transformers, lamps, ballasts, etc., given costs associated with energy consumption when compared with installation. The selection of replacement parts that are compatible with existing system components and loads is critical. The purpose of this paper is to discuss fundamental electrical design principles often overlooked when replacing existing equipment with energy efficient models. NOTE: The views expressed in this paper are those of the author and do not necessarily reflect the views of the United States of America, the U. S. Department of Justice, or the Federal Bureau of Prisons.

Massey, G. W.

2005-01-01T23:59:59.000Z

354

Homogenous BSCCO-2212 Round Wires for Very High Field Magnets  

Science Conference Proceedings (OSTI)

The performance demands on modern particle accelerators generate a relentless push towards higher field magnets. In turn, advanced high field magnet development places increased demands on superconducting materials. Nb3Sn conductors have been used to achieve 16 T in a prototype dipole magnet and are thought to have the capability for {approx}18 T for accelerator magnets (primarily dipoles but also higher order multipole magnets). However there have been suggestions and proposals for such magnets higher than 20 T. The High Energy Physics Community (HEP) has identified important new physics opportunities that are enabled by extremely high field magnets: 20 to 50 T solenoids for muon cooling in a muon collider (impact: understanding of neutrinos and dark matter); and 20+ T dipoles and quadrupoles for high energy hadron colliders (impact: discovery reach far beyond present). This proposal addresses the latest SBIR solicitation that calls for grant applications that seek to develop new or improved superconducting wire technologies for magnets that operate at a minimum of 12 Tesla (T) field, with increases up to 15 to 20 T sought in the near future (three to five years). The long-term development of accelerator magnets with fields greater than 20 T will require superconducting wires having significantly better high-field properties than those possessed by current Nb{sub 3}Sn or other A15 based wires. Given the existing materials science base for Bi-2212 wire processing, we believe that Bi{sub 2}Sr{sub 2}CaCu{sub 2}O{sub y} (Bi-2212) round wires can be produced in km-long piece lengths with properties suitable to meet both the near term and long term needs of the HEP community. The key advance will be the translation of this materials science base into a robust, high-yield wire technology. While the processing and application of A15 materials have advanced to a much higher level than those of the copper oxide-based, high T{sub c} (HTS) counterparts, the HTS materials have the very significant advantage of an extremely high H{sub c2}. For this reason, Bi{sub 2}Sr{sub 2}CaCu{sub 2}O{sub y} (Bi-2212, or 2212) in the form of a multifilamentary Ag alloy matrix composite is beginning to attract the interest of the magnet community for future extremely high-field magnets or magnet-insert coils for 4.2K operation. Fig. 1 shows an example of excellent JE (engineering current density) in Bi-2212 round wire at fields up to 45 T, demonstrating the potential for high field applications of this material. For comparison, the Nb{sub 3}Sn wires used in magnets in the 16-18 T range typically perform with J{sub E} in the range 200-500 A/mm{sup 2}; the Bi-2212 wire retains this level of performance to fields at least as high as 45 T, and probably significantly higher. Bi-2212 conductors have in fact been used to generate a 25 T field in a superconducting insert magnet. These two factors- the very high field critical current performance of Bi-2212, and the already demonstrated capability of this material for high field magnets up to 25 T, strongly suggest this material as a leading contender for the next generation high field superconducting (HFS) wire. This potential was recognized by the US Academy of Science's Committee on Opportunities in High Magnetic Field Science. Their report of the same name specifically calls out the high field potential for this material, and suggests that 30 T magnets appear feasible based on the performance of 2212. There are several requirements for HFS conductors. The most obvious is J{sub E} (B, T), the engineering current density at the field and temperature of operation. As shown in Fig. 1, Bi-2212 excels in this regard. Stability requirements for magnets dictate that the effective filament diameter should be less than 30 micrometers, something that Bi-2212 multifilamentary wire can uniquely satisfy among the HFS superconducting wire technologies. Additional requirements include mechanical properties that prevent stress limitation of J{sub E} at the operating conditions, resistive transition index (n-value) suffic

Dr. Scott Campbell Dr. Terry Holesinger Dr. Ybing Huang

2012-06-30T23:59:59.000Z

355

Polarimetry and Schlieren diagnostics of underwater exploding wires  

SciTech Connect

Nondisturbing laser-probing polarimetry (based on the Faraday and Kerr effects) and Schlieren diagnostics were used in the investigation of underwater electrical wire explosion. Measuring the polarization plane rotation angle of a probing laser beam due to the Faraday effect allows one to determine an axially resolved current flowing through the exploding wire, unlike commonly used current probes. This optical method of measuring current yields results that match those obtained using a current viewing resistor within an accuracy of 10%. The same optical setup allows simultaneous space-resolved measurement of the electric field using the Kerr effect. It was shown that the maximal amplitude of the electric field in the vicinity of the high-voltage electrode is approx80 kV/cm and that the radial electric field is <1 MV/cm during the wire explosion. Finally, it was shown that the use of Schlieren diagnostics allows one to obtain qualitatively the density distribution behind the shock wave front, which is important for the determination of the energy transfer from the discharge channel to the generated water flow.

Fedotov-Gefen, A. V.; Krasik, Ya. E. [Physics Department, Technion, 32000 Haifa (Israel)

2009-11-01T23:59:59.000Z

356

UCSF Green Campus Residential Resource Efficiency Project  

E-Print Network (OSTI)

UCSF Green Campus Residential Resource Efficiency Project Executive Summary Goal: To help UCSF on tenant behavioral upgrades Data Analysis ·Calculation of predicted savings on water use (gallons), electricity (kWh), and natural gas (therms) if current installations are replaced or upgraded to meet 2010

Yamamoto, Keith

357

Sustainable LED Fluorescent Light Replacement Technology  

SciTech Connect

Ilumisys and the National Center for Manufacturing Sciences (NCMS) partnered on a three-year project awarded by the United States (U.S.) Department of Energy (DOE), to quantify the impacts of LED lamps, incandescent lamps and fluorescent benchmark lamps over a product lifecycle – i.e. to develop a sustainable design and manufacturing strategy that addresses product manufacturing, use, recycling and disposal scenarios for LED-based lighting. Based on the knowledge gained from extensive product tear-down studies of fluorescent and screw-in lighting products, lifecycle assessment tools, and accelerated lifecycle testing protocols, an interactive Sustainable LED Design Guide has been developed to aid architectural and lighting designers and engineers in making design decisions that consider three important environmental impacts (greenhouse gas emissions, energy use and mercury emission) across all phases of the life of an LED lighting product. Critical information developed for the lifecycle analysis and product feature comparisons is the useful life of the lighting product as well as its performance. The Design Guide is available at www.ncms.org, and was developed based on operational and durability testing of a variety of lighting products including power consumption, light output, and useful life of a lamp in order to allow a more realistic comparison of lamp designs. This report describes the main project tasks, results and innovative features of the lifecycle assessment (LCA)-based design tools, and the key considerations driving the sustainable design of LED lighting systems. The Design Guide incorporates the following three novel features for efficiently evaluating LED lighting features in value-chains: • Bill-of-Materials (BOM) Builder – Designers may import process data for each component and supply functional data for the product, including power, consumption, lumen output and expected useful life. • Environmental Impact Review – Designs are comparable across lifecycle phases, subsystems, and environmental impact category, and can be normalized to a userdefined functional unit. • Drill-down Review – These provide an indepth look at individual lamp designs with the ability to review across subsystem or lifecycle phase.

None

2011-06-30T23:59:59.000Z

358

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

359

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

360

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

362

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

363

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

364

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

365

10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement  

SciTech Connect

The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

David E. Korns

2012-05-01T23:59:59.000Z

366

Wire Wrapped Hexagonal Pin Arrays for Hydride Fueled PWRs  

E-Print Network (OSTI)

This work contributes to the Hydride Fuels Project, a collaborative effort between UC Berkeley and MIT

Diller, Peter

367

Western LNG project - Project summary  

Science Conference Proceedings (OSTI)

The Western LNG Project is a major new undertaking involving the liquefaction of conventional natural gas from the Western Canadian Sedimentary Basin at a plant on the British Columbia north coast. The gas in its liquid form will be shipped to Japan for consumption by utility companies. The Project represents a new era in gas processing and marketing for the Canadian natural gas industry.

Forgues, E.L.

1984-02-01T23:59:59.000Z

368

MHD Integrated Topping Cycle Project  

DOE Green Energy (OSTI)

This seventeenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period August 1, 1991 to October 31, 1991. Manufacturing of the prototypical combustor pressure shell has been completed including leak, proof, and assembly fit checking. Manufacturing of forty-five cooling panels was also completed including leak, proof, and flow testing. All precombustor internal components (combustion can baffle and swirl box) were received and checked, and integration of the components was initiated. A decision was made regarding the primary and backup designs for the 1A4 channel. The assembly of the channel related prototypical hardware continued. The cathode wall electrical wiring is now complete. The mechanical design of the diffuser has been completed.

Not Available

1992-07-01T23:59:59.000Z

369

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

370

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

371

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

372

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

373

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

374

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

375

10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors  

SciTech Connect

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs and having the PCPs also function as ECPs will require significant safety basis changes requiring DOE approval. 2. Evaluation Criteria #4 (Use of new technology). The use of VFD and VFD “pump catcher” technology for the PCPs is not currently in use and has not been previously formally reviewed/approved by DOE for ATR. It is noted that VFD technology has several decades of commercial use and experience. However, the ATR probabilistic risk assessment will have to be updated, reflecting the changes for supplying ECP flows including VFD reliability, to confirm that the proposed activity maintains or reduces the CDF for the ATR. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). It is expected that the proposed activity will result in a revised list of safety-related SSCs. Specifically, as currently proposed, the existing ECPs will be deleted from the list. The PCPs and their associated components, picking up the ECP function, will be classified as safety-related active Seismic Category I.

Noel Duckwitz

2011-05-01T23:59:59.000Z

376

Repair and Replacement projects help FM to honor its commitment to  

E-Print Network (OSTI)

space on the East and West Bank of the Twin Cities campus. The University's steam distribution system include: · Steam (www.facm.umn. edu/services/energymgmt.html) The University of Minnesota operates of their electrical distribution system. Services provided within the Administrative Service Unit cost pool

Gulliver, Robert

377

BWRVIP-229: BWR Vessel and Internals Project, Alloy X-750 Replacement Roadmap  

Science Conference Proceedings (OSTI)

Utilities require degradation-resistant, high-strength material for use in performing repairs to boiling water reactors (BWRs) as well as for use in new construction. This report reviews a number of alloys for applicability to BWR service conditions.

2009-12-11T23:59:59.000Z

378

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

379

Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

380

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis of CO 2 Exposed Wells to Predict Long Term Leakage through the Development of an Integrated Neural- Genetic Algorithm Project DE FE0009284 Boyun Guo, Ph.D. University of...

382

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

383

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

384

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

385

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

386

LUCF Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

RZWR'HVLJQDQG RZWR'HVLJQDQG +RZWR'HVLJQDQG ,PSOHPHQW&DUERQ ,PSOHPHQW&DUERQ 0HDVXULQJDQG0RQLWRULQJ 0HDVXULQJDQG0RQLWRULQJ $.WLYLWLHVIRU/8&) $.WLYLWLHVIRU/8&) 3URMH.WV 3URMH.WV Sandra Brown Winrock International sbrown@winrock.org Winrock International 2 3URMH.WGHVLJQLVVXHV 3URMH.WGHVLJQLVVXHV z Baselines and additionality z Leakage z Permanence z Measuring and monitoring z Issues vary with projects in developed versus developing countries Winrock International 3 /HDNDJH /HDNDJH z Leakage is the unanticipated loss or gain in carbon benefits outside of the project's boundary as a result of the project activities-divide into two types: - Primary leakage or activity shifting outside project area - Secondary leakage or market effects due to

387

Project 265  

NLE Websites -- All DOE Office Websites (Extended Search)

The goal of this project is to develop an on-line instrument using multi- wavelength lasers that is capable of characterizing particulate matter (PM) generated in fossil energy...

388

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

"Carbonsheds" as a Framework for Optimizing US CCS Pipeline Transport on a Regional to National Scale DOE-ARRA Project Number DE-FE0001943 Lincoln Pratson Nicholas School of the...

389

Project 114  

NLE Websites -- All DOE Office Websites (Extended Search)

Prototech Company SRI International Kellogg, Brown, and Root ChevronTexaco Sd-Chemie, Inc. COST Total Project Value 20,320,372 DOENon-DOE Share 15,326,608 4,993,764...

390

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

391

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Laboratory U.S. Department of Energy Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

392

Project 134  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Goal To demonstrate a "whole plant" approach using by-products from a coal-fired power plant to sequester carbon in an easily quantifiable and verifiable form. Objectives...

393

MANHATTAN PROJECT  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy traces its origins to World War II and  the Manhattan Project effort to build the first atomic bomb. As the direct descendent of the Manhattan Engineer District, the...

394

Project 310  

NLE Websites -- All DOE Office Websites (Extended Search)

carbohydrate generated from agricultural enterprises in the U.S., such as corn wet-milling. This project is studying the production of a suite of specialty chemicals by...

395

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

G., 2011, Design and package of a 14CO2 field analyzer: the Global Monitor Platform (GMP). Proceedings of SPIE, v 8156, p. 81560E 17 DOE-NETL PROJECT REVIEW MEETING 08-21-2012...

396

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

397

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

398

Project 297  

NLE Websites -- All DOE Office Websites (Extended Search)

of this project is to utilize pure oxygen at a feed rate of less than 10% of the stoichiometric requirement in demonstrating the use of oxygen-enhanced combustion in meeting...

399

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D...

400

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D....

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

NREL: Energy Sciences - Marine Corps Taps NREL to Help Replace...  

NLE Websites -- All DOE Office Websites (Extended Search)

Science News Events Printable Version Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013

The 1940s central steam...

402

Remarks at the Capability Replacement Laboratory (CRL) Completion Ceremony  

NLE Websites -- All DOE Office Websites (Extended Search)

at the Capability Replacement Laboratory (CRL) Completion Ceremony at the Capability Replacement Laboratory (CRL) Completion Ceremony by Deputy Administrator Anne M. Harrington | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Speeches > Remarks at the Capability Replacement Laboratory (CRL) ... Speech Remarks at the Capability Replacement Laboratory (CRL) Completion Ceremony

403

EA-1178: 300 Area Steam Plant Replacement, Hanford Site, Richland,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

78: 300 Area Steam Plant Replacement, Hanford Site, Richland, 78: 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington EA-1178: 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts for a proposed energy conservation measure for a number of buildings in the 300 Area of the U.S. Department of Energy Hanford Site. The proposed action includes replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing new natural gas pipelines to provide a source for many of these units and constructing a central control building to operate and maintain the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD March 12, 1997 EA-1178: Finding of No Significant Impact

404

Mechanism of Concentric Eyewall Replacement Cycles and Associated Intensity Change  

Science Conference Proceedings (OSTI)

To understand the mechanisms responsible for the secondary eyewall replacement cycles and associated intensity changes in intense tropical cyclones (TCs), two numerical experiments are conducted in this study with the Weather Research and ...

Xiaqiong Zhou; Bin Wang

2011-05-01T23:59:59.000Z

405

Replace Pressure-Reducing Valves with Backpressure Turbogenerators  

SciTech Connect

This revised ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

406

A cache-partitioning aware replacement policy for chip multiprocessors  

Science Conference Proceedings (OSTI)

Chip multiprocessors (CMPs) usually employ shared, last-level caches to use on-chip memory resources effectively. Unfortunately, conventional replacement policies applied to shared caches fail to partition memory resources among cores to achieve an optimal ...

Haakon Dybdahl; Per Stenström; Lasse Natvig

2006-12-01T23:59:59.000Z

407

Laboratory Evaluation of LED T8 Replacement Lamp Products  

Science Conference Proceedings (OSTI)

A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

2011-05-23T23:59:59.000Z

408

Drop-in replacement biofuels : meeting the challenge  

E-Print Network (OSTI)

This thesis presents a discussion on the challenges that must be met to fulfill the U.S. Navy's strategic imperatives for its energy vision. It provides an introduction to drop-in replacement biofuels, the options amongst ...

Bhargava, Alok (Alok Kishore)

2011-01-01T23:59:59.000Z

409

Marin County - Wood Stove Replacement Rebate Program (California...  

Open Energy Info (EERE)

DSIRE1 Summary The County of Marin has created a rebate program to encourage homeowners to remove or replace non-EPA certified wood-burning heaters (wood stoves and...

410

Solid-State Lighting: Text-Alternative Version: LED Replacement...  

NLE Websites -- All DOE Office Websites (Extended Search)

I'd like to welcome everyone to this webcast on the very timely topic of light emitting diode replacement lamps and the latest on the ENERGY STAR programs efforts in this...

411

Intensity and Structure Changes during Hurricane Eyewall Replacement Cycles  

Science Conference Proceedings (OSTI)

A flight-level aircraft dataset consisting of 79 Atlantic basin hurricanes from 1977 to 2007 was used to develop an unprecedented climatology of inner-core intensity and structure changes associated with eyewall replacement cycles (ERCs). During ...

Matthew Sitkowski; James P. Kossin; Christopher M. Rozoff

2011-12-01T23:59:59.000Z

412

Parallel-wire grid assembly with method and apparatus for construction thereof  

DOE Patents (OSTI)

Disclosed is a parallel wire grid and an apparatus and method for making the same. The grid consists of a generally coplanar array of parallel spaced-apart wires secured between metallic frame members by an electrically conductive epoxy. The method consists of continuously winding a wire about a novel winding apparatus comprising a plurality of spaced-apart generally parallel spindles. Each spindle is threaded with a number of predeterminedly spaced-apart grooves which receive and accurately position the wire at predetermined positions along the spindle. Overlying frame members coated with electrically conductive epoxy are then placed on either side of the wire array and are drawn together. After the epoxy hardens, portions of the wire array lying outside the frame members are trimmed away.

Lewandowski, E.F.; Vrabec, J.

1981-10-26T23:59:59.000Z

413

Parallel-wire grid assembly with method and apparatus for construction thereof  

DOE Patents (OSTI)

Disclosed is a parallel wire grid and an apparatus and method for making the same. The grid consists of a generally coplanar array of parallel spaced-apart wires secured between metallic frame members by an electrically conductive epoxy. The method consists of continuously winding a wire about a novel winding apparatus comprising a plurality of spaced-apart generally parallel spindles. Each spindle is threaded with a number of predeterminedly spaced-apart grooves which receive and accurately position the wire at predetermined positions along the spindle. Overlying frame members coated with electrically conductive epoxy are then placed on either side of the wire array and are drawn together. After the epoxy hardens, portions of the wire array lying outside the frame members are trimmed away.

Lewandowski, Edward F. (Westmont, IL); Vrabec, John (South Holland, IL)

1984-01-01T23:59:59.000Z

414

Radial electric field 3D modeling for wire arrays driving dynamic hohlraums on Z.  

SciTech Connect

The anode-cathode structure of the Z-machine wire array results in a higher negative radial electric field (Er) on the wires near the cathode relative to the anode. The magnitude of this field has been shown to anti-correlate with the axial radiation top/bottom symmetry in the DH (Dynamic Hohlraum). Using 3D modeling, the structure of this field is revealed for different wire-array configurations and for progressive mechanical alterations, providing insight for minimizing the negative Er on the wire array in the anode-to-cathode region of the DH. Also, the 3D model is compared to Sasorov's approximation, which describes Er at the surface of the wire in terms of wire-array parameters.

Mock, Raymond Cecil

2007-06-01T23:59:59.000Z

415

Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin  

Science Conference Proceedings (OSTI)

The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

David Brien

2012-06-21T23:59:59.000Z

416

Guidelines for Replacement Materials for Service Water Systems  

Science Conference Proceedings (OSTI)

Many power plants have ordered replacement materials for service water system components such as piping and heat exchanger tubing, only to find that the replacement materials do not perform as expected. Plant personnel who believed they were procuring like-for-like materials are at a loss as to why more modern materials, and components fabricated from more modern materials, can often provide inferior service, compared to original equipment. This report from the Electric Power Research Institute (EPRI) lo...

2012-08-10T23:59:59.000Z

417

Mound bridge-wire welding, testing and corrosion seminar, Miamisburg, OH, May 7-8, 1968  

SciTech Connect

Brief summaries are presented on the following presentations: welding for low voltage operation, welding techniques at Mound, welding/joining at Sandia, Ultrasonic`s plastic assemblies of detonator components, laser welding bridge-wires, laser safety in the Biorad industrial environment, nondestructive testing at Mound, thermal cycle data and evaluation, thermal cycle nondestructive testing, corrosion of detonator electrode and bridge-wire, and corrosion studies and fabrication of bridge-wire at Sigmund Cohn.

Richards, M.A.

1968-08-07T23:59:59.000Z

418

Investigating the Use of Ultrasonic Guided Waves for Aging Wire Insulation Assessment  

E-Print Network (OSTI)

Aging wiring has become a critical issue to DoD, NASA, FAA, and Industry. The problem is that insulation on environmentally aged wire becomes brittle and cracks. This exposes the underlying conductive wire to the potential for short circuits and fire. The difficulty is that techniques to monitor aging wire problems focus on applying electrical sensing techniques that are not very sensitive to the wire insulation. Thus, the development of methods to quantify and monitor aging wire insulation is highly warranted. Measurement of wire insulation stiffness by ultrasonic guided waves is being examined. Initial laboratory tests were performed on a simple model consisting of a solid cylinder and then a solid cylinder with a polymer coating. Experimental measurements showed that the lowest order axisymmetric mode may be sensitive to stiffness changes in the wire insulation. To test this theory, mil-spec wire samples MIL-W-81381, MIL-W-22759/34, and MIL-W-22759/87 (typically found in aircraft) were heat-damaged in an oven, in a range of heating conditions. The samples were 12, 16, and 20 gauge and the heat-damage introduced material changes in the wire-insulation that made the originally flexible insulation brittle and darker in color. Axisymmetric mode phasevelocity increased for the samples that were exposed to heat for longer duration. For example, the phase velocity in the 20-gauge MIL-W-22759/34 wire changed from a baseline value of 2790m/s to 3280m/s and 3530m/s for one-hour exposures to 349 C and 399 C, respectively. Although the heat-damage conditions are not the same as environmental aging, we believe that with further development and refinements, the ultrasonic guided waves can be used to inspect wire-insulation for detrimental environmental aging conditions.

Robert F. Anastasi; Eric I. Madaras

2002-01-01T23:59:59.000Z

419

SpaceWire model development technology for satellite architecture.  

DOE Green Energy (OSTI)

Packet switched data communications networks that use distributed processing architectures have the potential to simplify the design and development of new, increasingly more sophisticated satellite payloads. In addition, the use of reconfigurable logic may reduce the amount of redundant hardware required in space-based applications without sacrificing reliability. These concepts were studied using software modeling and simulation, and the results are presented in this report. Models of the commercially available, packet switched data interconnect SpaceWire protocol were developed and used to create network simulations of data networks containing reconfigurable logic with traffic flows for timing system distribution.

Eldridge, John M.; Leemaster, Jacob Edward; Van Leeuwen, Brian P.

2011-09-01T23:59:59.000Z

420

Replaces EIA-459F All Other Editions Are Obsolete OMB Control No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 (10-94) Replaces EIA-459F All Other Editions Are Obsolete OMB Control No. 1910-0400 U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE PROGRAM/PROJECT STATUS REPORT Public reporting burden for this collection of information is estimated to average 47.5 hours per response, including the time for reviewing instructions, search- ing existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Office of Information Resources Management Policy, Plans, and Oversight, Records Management Division, HR-422 - GTN, Paperwork Reduction Project (1910-0400), U.S. Department of

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Replaces EIA-459B U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MILESTONE PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(03-94) Replaces EIA-459B U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MILESTONE PLAN OMB Control No. 1910-0400 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Office of Information Resources Management Policy, Plans, and Oversight, Records Management Division, HR-422 - GTN, Paperwork Reduction Project (1910-0400), U.S. Department of Energy, 1000 Independence Avenue, S.W., Washington, DC 20585; and to the Office of Management and Budget (OMB), Paperwork Reduction Project (1910-0400), Washington, DC 20503.

422

Microsoft Word - CX-WenatcheeDistrictPoleReplacementFY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2013 2, 2013 REPLY TO ATTN OF: KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Joseph Lauer Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor access road maintenance along various transmission line right-of-ways in Bonneville Power Administration's (BPA) Wenatchee District. The following lines will have pole change-outs in 2013: Grandview-Red Mountain #1 and Columbia-Valhalla #2. PP&A Project No.: 2604 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities. Location: Various transmission lines located within the Wenatchee District. See Project Location Attachment for structure locations and corresponding transmission lines.

423

Microsoft Word - CX-Minidoka-Unity_Wood PoleReplacementFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2012 , 2012 REPLY TO ATTN OF: KEP-CELILO SUBJECT: Environmental Clearance Memorandum Mark Hadley Lineman Foreman III - TFIF-Idaho Falls Proposed Action: Wood pole replacement along the Minidoka Power House-Unity No. 1 and Unity-Heyburn No. 1, 138-kV transmission line rights-of-way. PP&A Project No.: 2192 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The project area is located in Cassia County, Idaho, in Bonneville Power

424

Enhancing Performance of /MOD-YBCO/RABiTSTM-based 2G Wire  

Science Conference Proceedings (OSTI)

AMSC's approach to enhance the wire performance is twofold: 1) Increasing the self-field critical current; 2) Enhancing the flux pinning performance. AMSC's ...

425

Wire-shaped semiconductor light-emitting diodes for general-purpose lighting  

SciTech Connect

The object of this work is to develop and optimize a new type of light-emitting diode (LED) with a wire-shaped, cylindrical geometry.

Mauk, Michael G.

2002-10-28T23:59:59.000Z

426

Corrosion Products of Iron Wire Arterial Implants from In Vivo and In ...  

Science Conference Proceedings (OSTI)

In the present study, iron wire was implanted into either the abdominal rat aortic wall or ... Fabrication of a Cellulosic Nanocomposite Scaffold with Improved ...

427

Synthesis of Superconducting MgB2 Wire, Tapes and Films - Energy ...  

Electricity Transmission Synthesis of Superconducting MgB2 Wire, Tapes and Films Ames Laboratory. Contact AMES About This Technology Technology Marketing ...

428

Production of a Low-Cost DMD Wire Feedstock by Direct ...  

Science Conference Proceedings (OSTI)

Presentation Title, Production of a Low-Cost DMD Wire Feedstock by Direct Consolidation of Ti Sponge. Author(s), Kevin F. Dring, Martin Lefstad, Ola Jensrud.

429

Feature based cost and carbon emission modelling for wire and arc additive manufacturing.  

E-Print Network (OSTI)

??The wire and arc additive manufacturing (WAAM) is a CNC and welding deposition based additive manufacturing method. This novel manufacturing technique has potential cost and… (more)

Guo, Jianing

2012-01-01T23:59:59.000Z

430

Polarization dependence of the absorption coefficient for an array of strained quantum wires  

Science Conference Proceedings (OSTI)

The polarization dependence of the absorption coefficient for compressively and tensilely strained quantum wires is investigated as a function of strain

Igor Vurgaftman; Jasprit Singh

1995-01-01T23:59:59.000Z

431

Indentation response of polymer films and aircraft wiring with polymer insulation.  

E-Print Network (OSTI)

??M.S. The airline regulatory communities are interested in methods that can access degradation in the polymer insulation of aging aircraft wiring. This study investigates the… (more)

Nagendran, Kaushik Bindiganavile, 1979-

2005-01-01T23:59:59.000Z

432

A study of replacement rules for a parallel fleet replacement problem based on user preference utilization pattern and alternative fuel considerations  

Science Conference Proceedings (OSTI)

Parallel fleet replacement problems deal with determining an optimal replacement schedule that results in a minimal total cost of owning and operating a fleet within a finite planning horizon. In this paper, the fleet consists of service vehicles, varying ... Keywords: Alternative fuels, Parallel fleet replacement, Replacement rules, User preference utilization

Parthana Parthanadee; Jirachai Buddhakulsomsiri; Peerayuth Charnsethikul

2012-08-01T23:59:59.000Z

433

Design and development of a 3He replacement safeguards neutron counter based on 10B-lined proportional detector technology  

SciTech Connect

This presentation represents an overview of the experimental evaluation of a boron-lined proportional technology performed within an NA-241 sponsored project on testing of boron-lined proportional counters for the purpose of replacement of {sup 3}He technologies. The presented boron-lined technology will be utilized in a design of a full scale safeguards neutron coincidence counter. The design considerations and the Monte Carlo performance predictions for the counter are also presented.

Henzlova, Daniela [Los Alamos National Laboratory; Evans, Louise [Los Alamos National Laboratory; Menlove, Howard O. [Los Alamos National Laboratory; Swinhoe, Martyn T. [Los Alamos National Laboratory; Rael, Carlos D. [Los Alamos National Laboratory; Martinez, Isaac P. [Los Alamos National Laboratory; Marlow, Johnna B. [Los Alamos National Laboratory

2012-07-16T23:59:59.000Z

434

EIA - AEO2010 - U.S. nuclear power plants: Continued life or replacement  

Gasoline and Diesel Fuel Update (EIA)

U.S. nuclear power plants: continued life or replacement after 60? U.S. nuclear power plants: continued life or replacement after 60? Annual Energy Outlook 2010 with Projections to 2035 U.S. nuclear power plants: Continued life or replacement after 60? Background Nuclear power plants generate approximately 20 percent of U.S. electricity, and the plants in operation today are often seen as attractive assets in the current environment of uncertainty about future fossil fuel prices, high construction costs for new power plants (particularly nuclear plants), and the potential enactment of GHG regulations. Existing nuclear power plants have low fuel costs and relatively high power output. However, there is uncertainty about how long they will be allowed to continue operating. The nuclear industry has expressed strong interest in continuing the operation of existing nuclear facilities, and no particular technical issues have been identified that would impede their continued operation. Recent AEOs had assumed that existing nuclear units would be retired after 60 years of operation (the initial 40-year license plus one 20-year license renewal). Maintaining the same assumption in AEO2010, with the projection horizon extended to 2035, would result in the retirement of more than one-third of existing U.S. nuclear capacity between 2029 and 2035. Given the uncertainty about when existing nuclear capacity actually will be retired, EIA revisited the assumption for the development of AEO2010 and modified it to allow the continued operation of all existing U.S. nuclear power plants through 2035 in the Reference case.

435

Conjugated "Molecular Wire" for Excitons  

NLE Websites -- All DOE Office Websites (Extended Search)

Conjugated "Molecular Wire" for Excitons Conjugated "Molecular Wire" for Excitons Yuki Shibano, Hiroshi Imahori, Paiboon Sreearunothai, Andrew R. Cook and John R. Miller J. Phys. Chem. Lett. 1, 1492-1496 (2010). [Find paper at ACS Publications] Abstract: We have synthesized new conjugated, rigid rod oligomers of fluorene, Fn(C60)2, n = 4, 8, 12, and 16. These pure compounds have Fn chains up to 140 Ã… long. The C60 groups covalently attached at both ends serve as traps for excitons created in the Fn chains. Excitons created in the chains by photoexcitation reacted rapidly with the C60 groups with decays described well by the sum of two exponentials. Mean reaction times were 2.3, 5.5, and 10.4 ps for n = 8, 12, and 16. In F16(C60)2, the 10.4 ps reaction time was 40 times faster than that found in earlier reports on

436

Wire-chamber radiation detector with discharge control  

DOE Patents (OSTI)

A wire chamber; radiation detector has spaced apart parallel electrodes and grids defining an ignition region in which charged particles or other ionizing radiations initiate brief localized avalanche discharges and defining an adjacent memory region in which sustained glow discharges are initiated by the primary discharges. Conductors of the grids at each side of the memory section extend in orthogonal directions enabling readout of the X-Y coordinates of locations at which charged particles were detected by sequentially transmitting pulses to the conductors of one grid while detecting transmissions of the pulses to the orthogonal conductors of the other grid through glow discharges. One of the grids bounding the memory region is defined by an array of conductive elements each of which is connected to the associated readout conductor through a separate resistance. The wire chamber avoids ambiguities and imprecisions in the readout of coordinates when large numbers of simultaneous or; near simultaneous charged particles have been detected. Down time between detection periods and the generation of radio frequency noise are also reduced.

Perez-Mendez, V.; Mulera, T.A.

1982-03-29T23:59:59.000Z

437

D0-EC RTD Wiring Layout (North Calorimeter)  

SciTech Connect

The temperature of the North End-Calorimeter of the D-Zero detector is to be monitored by several RTD temperature sensors. The location and other important information pertaining to each individual RTD is included in the following tables, which are grouped by bundle number. There are mne 60 pIll port connectors. Each connector corresponds to a bundle of twisted pairs. Twisted pairs, of one of eight colors along with either a black or white wire, run to 10-pin connectors which have a mate on the module or cryostat wall. In general, all 60 pins, or all 10 pins are not used. The color scheme of the wires was designed so that all the twisted pairs with white run West from the instrumentation port, and twisted pairs with black run East. This scheme proved to be very successful and efficient during the installation process. After being installed, every RTD connection was checked and their corresponding resistances were recorded by Jerry Blazey. All the RTD's tested successfully, except for 2. The 2 dead RTD's were: Channel 17 on bundle 4, which is located on the front of MH module 8L; and Channel 13 on bundle 5, which is located on the Bottom of the Middle Coarse Plate of the IH.

Primdahl, K.; /Fermilab

1991-06-04T23:59:59.000Z

438

D0-EC RTD Wiring Layout (South Calorimter)  

SciTech Connect

The temperature of the South End-Calorimeter of the D-Zero detector is to be monitored by several RTD temperature sensors. The location and other important information pertaining to each individual RTD is included in the following tables, which are grouped by bundle number. There are nine 60 pin port connectors. Each connector corresponds to a bundle of twisted pairs. Twisted pairs, of one of eight colors along with either a black or white wire, run to 10-pin connectors which have a mate on the module or cryostat wall. In general, all 60 pins, or all 10 pins are not used. The color scheme of the wires was deSigned so that all the twisted pairs with white run West from the instrumentation port, and twisted pairs with black run East. This scheme proved to be very successful and efficient during the installation process. After being installed, every RTD connection was checked and their corresponding resistances were recorded by Jerry Blazey. All the ATD's tested successfully, except for 4. The 4 dead RTD's were: Channel 12 on bundle 1, which is located on the back of OH module 7R; Channel 19 on bundle 4, which is located on the back of MH module 5L; Channel 9 on bundle 5, which is located on the IH fine 2-inch strap; and Channel 25 on bundle 7, which is located on the east strongback.

Leibfritz, J.R.; /Fermilab

1991-08-06T23:59:59.000Z

439

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Number (DE-FE0002056) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 Brighton 1&2 2:40 August 20, 2013 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary ORGANIZATIONAL STRUCTURE Modeling CO 2 Sequestration in Saline A quifer and Depleted Oil Reservoir to Evaluate Regional CO 2 Sequestration Potential of Ozark Plateau A quifer System, South-Central Kansas Co-Principal Investigators Co-Principal Investigators Kerry D. Newell -- stratigraphy, geochemistry

440

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

442

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

443

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER COUNTY, KANSAS DE-FE0006821 W. Lynn Watney, Jason Rush, Joint PIs Kansas Geological Survey The University of Kansas Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Brighton 1&2 Wednesday 8-21-13 1:10-1:35 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 2 Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Project Team DOE-NETL Contract #FE0006821 KANSAS STATE UNIVERSITY 3 L. Watney (Joint PI), J. Rush (Joint PI), J. Doveton, E. Holubnyak, M. Fazelalavi, R. Miller, D. Newell, J. Raney

444

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Seal Repair Using Seal Repair Using Nanocomposite Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Ed Matteo, Thomas Dewers Sandia National Laboratories 2 Presentation Outline * Introduction and overview * Materials synthesis * Materials testing and characterization * Annular seal system testing * Numerical simulation * Summary 3 Benefit to the Program * BENEFITS STATEMENT: The project involves the development and testing of polymer-cement nanocomposites for repairing flaws in annular wellbore seals. These materials will have superior characteristics compared to conventional

445

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

446

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

447

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

448

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring Geological CO Monitoring Geological CO 2 Sequestration using Perfluorocarbon and Stable Isotope Tracers Project Number FEAA-045 Tommy J. Phelps and David R. Cole* Oak Ridge National Laboratory Phone: 865-574-7290 email: phelpstj@ornl.gov (*The Ohio State University) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Developing the Technologies and Building the Infrastructure for CO 2 Storage August 22, 2013 2 Project Overview: Goals and Objectives Goal: Develop methods to interrogate subsurface for improved CO 2 sequestration, field test characterization and MVA, demonstrate CO 2 remains in zone, and tech transfer. Objectives: 1. Assessment of injections in field. PFT gas tracers are analyzed by GC-ECD to

449

Project Homepage  

NLE Websites -- All DOE Office Websites (Extended Search)

Middle School Home Energy Audit Middle School Home Energy Audit Project Homepage NTEP Home - Project Homepage - Teacher Homepage - Student Pages Abstract: This set of lessons provides an opportunity for midlevel students to gain a basic understanding of how energy is turned into power, how power is measured using a meter, the costs of those units and the eventual reduction of energy consumption and cost to the consumer. Introduction to Research: By conducting energy audits of their own homes and completing exercises to gain baclground information, students begin to see the importance of energy in their daily lives. By using the Internet as a research tool, students gain develop research skills as they gain knowledge for their project. They use e-mail to collaborate with energy experts and share results with other

450

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

451

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Acknowledgments Dave Harris, Kentucky Geological Survey Dave Barnes, Western Michigan University John Rupp, Indiana Geological Survey Scott Marsteller, Schlumberger Carbon Services John McBride, Brigham Young University * Project is funded by the U.S. Department of Energy through the National Energy Technology Laboratory (NETL) and by a cost share agreement with the Illinois Department of Commerce and Economic Opportunity, Office of Coal Development through the Illinois Clean Coal Institute * ConocoPhillips: in-kind match * Western Kentucky Carbon Storage Foundation: matching funding * SeisRes 2020, Houston: VSP acquisition and processing

452

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

453

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Results from Simulation Project Results from Simulation Framework for Regional Geologic CO 2 Storage Infrastructure along Arches Province of Midwest United States DOE Award No. DE-FE0001034 Ohio Dept. of Dev. Grant CDO/D-10-03 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting August 21-23, 2012 Joel Sminchak and Neeraj Gupta Battelle Energy Systems sminchak@battelle.org, 614-424-7392 gupta@battelle.org, 614-424-3820 BUSINESS SENSITIVE 2 Presentation Outline 1. Technical Status 2. Background (CO 2 Sources, Geologic Setting) 3. Injection Well history 4. Geocellular Model Development 5. Geological Data (Geological dataset, Geostatistics) 6. Geocellular porosity/permeability model development 7. Pipeline Routing Analysis

454

Research projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Yuan » Research projects Yuan » Research projects Research projects Research Interests Scientific computing, domain decomposition methods Linear solvers for sparse matrices Computational plasma physics Grid generation techniques GPU computing Current Research PDSLin: A hybrid linear solver for large-scale highly-indefinite linear systems The Parallel Domain decomposition Schur complement based Linear solver (PDSLin), which implements a hybrid (direct and iterative) linear solver based on a non-overlapping domain decomposition technique called chur complement method, and it has two levels of parallelism: a) to solve independent subdomains in parallel and b) to apply multiple processors per subdomain. In such a framework, load imbalance and excessive communication lead to the performance bottlenecks, and several techniques are developed

455

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

456

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

457

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Fidelity Computational Analysis of Fidelity Computational Analysis of CO2 Trappings at Pore-scales Project Number: DE-FE0002407 Vinod Kumar (vkumar@utep.edu) & Paul Delgado (pmdelgado2@utep.edu) University of Texas at El Paso U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Collaborators: Dr. C. Harris (Shell Oil Company/Imperial College), Dr. G. Bromhal (NETL), Dr. M. Ferer (WVU/NETL), Dr. D. Crandall (NETL-Ctr), and Dr. D. McIntyre (NETL). 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - Pore-network modeling - Conductance derivation for irregular geom. - Pore-to-CFD Computations

458

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

459

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

MVA Tools MVA Tools Sam Clegg, Kristy Nowak-Lovato, Ron Martinez, Julianna Fessenden, Thom Rahn, & Lianjie Huang Los Alamos National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview - Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix - Organization Chart - Bibliography 3 Project Overview: Goals and Objectives * Surface MVA - Frequency Modulated Spectroscopy - Quantitatively identify CO2, H2S and CH4 seepage from geologic sequestration sites - Distinguish anthropogenic CO2 from natural CO2 emissions * CO2 carbon stable isotope measurements

460

Project Plan Remote Target Fabrication Refurbishment Project  

Science Conference Proceedings (OSTI)

In early FY2009, the DOE Office of Science - Nuclear Physics Program reinstated a program for continued production of {sup 252}Cf and other transcurium isotopes at the Radiochemical Engineering Development Center (REDC) at Oak Ridge National Laboratory (ORNL). The FY2009 major elements of the workscope are as follows: (1) Recovery and processing of seven transuranium element targets undergoing irradiation at the High Flux Isotope Reactor (HFIR) at ORNL; (2) Development of a plan to manufacture new targets for irradiation beginning in early- to mid-FY10 to supply irradiated targets for processing Campaign 75 (TRU75); and (3) Refurbishment of the target manufacturing equipment to allow new target manufacture in early FY10 The {sup 252}Cf product from processing Campaign 74 (recently processed and currently shipping to customers) is expected to supply the domestic demands for a period of approximately two years. Therefore it is essential that new targets be introduced for irradiation by the second quarter of FY10 (HFIR cycle 427) to maintain supply of {sup 252}Cf; the average irradiation period is {approx}10 HFIR cycles, requiring about 1.5 calendar years. The strategy for continued production of {sup 252}Cf depends upon repairing and refurbishing the existing pellet and target fabrication equipment for one additional target production campaign. This equipment dates from the mid-1960s to the late 1980s, and during the last target fabrication campaign in 2005- 2006, a number of component failures and operations difficulties were encountered. It is expected that following the target fabrication and acceptance testing of the targets that will supply material for processing Campaign 75 a comprehensive upgrade and replacement of the remote hot-cell equipment will be required prior to subsequent campaigns. Such a major refit could start in early FY 2011 and would take about 2 years to complete. Scope and cost estimates for the repairs described herein were developed, and authorization for the work was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

Bell, Gary L [ORNL; Taylor, Robin D [ORNL

2009-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

DE-FE0002225: DE-FE0002225: Actualistic and geochemical modeling of reservoir rock, CO 2 and formation fluid interaction, Citronelle oil field, Alabama West Virginia University & University of Alabama Presenter: Dr. Amy Weislogel (WVU) Co-PI: Dr. Rona Donahoe (UA) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Overview & Project Map * Reservoir Geochemical Characterization * Formation Fluid Geochemistry * Geochemical Modeling * Summary 3 Benefit to the Program * Develop technologies that will support industries'

462

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

463

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool to Improve CO2 Sequestration DE FE0004542 Larry Murdoch, Clemson University Stephen Moysey, Clemson University Leonid Germanovich, Georgia Tech Cem Ozan, Baker Hughes Sihyun Kim, Georgia Tech Glenn Skawski, Clemson University Alex Hanna, Clemson University Johnathan Ebenhack, Clemson University Josh Smith, Clemson University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool, Larry Murdoch Project Review Meeting, 23 Aug. 2013 2 Presentation Outline * Preliminaries

464

Hallmark Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device communication Increased connectivity and automation in the control systems that manage the nation's energy infrastructure have improved system functionality, but left systems more vulnerable to cyber attack. Intruders could severely disrupt control system operation by sending fabricated information or commands to control system devices. To ensure message integrity, supervisory control and data acquisition (SCADA) systems require a method to validate device-to- device communication and verify that information has come from a trusted source and not been altered in transit. The Secure SCADA Communications Protocol (SSCP) provides message

465

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

DE-FE0001836: DE-FE0001836: Numerical modeling of geomechanical processes related to CO 2 injection within generic reservoirs Andreas Eckert & Runar Nygaard Missouri University of Science & Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Objectives, Benefits and Outcomes * Technical status: Project summary - Teaching - Reservoir scale (Geomechanics & Fluid flow simulation) - Borehole scale (Wellbore integrity & wellbore trajectory planning) * Conclusions * Appendix 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

466

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replace pole 145. Change uninsulated lead out with insulated riser wire, Replace crossarms. Replace insulators, Replace lightening arrestors, Replace wire, Old pole will be pulled...

467

CX-005859: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Office Replace pole 145. Change uninsulated lead out with insulated riser wire, replace crossarms, replace insulators, replace lightening arrestors, replace wire, old...

468

Cobalt discovery replaces precious metals as industrial catalyst  

NLE Websites -- All DOE Office Websites (Extended Search)

Cobalt Discovery Replaces Precious Metals Cobalt Discovery Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. Contact Nancy Ambrosiano Communications Office (505) 699-1149 Email Catalysts are also integral to thousands of industrial, synthetic, and

469

Cobalt discovery replaces precious metals as industrial catalyst  

NLE Websites -- All DOE Office Websites (Extended Search)

Cobalt Discovery Replaces Precious Metals Cobalt Discovery Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. Contact Nancy Ambrosiano Communications Office (505) 699-1149 Email Catalysts are also integral to thousands of industrial, synthetic, and

470

Public Invited to Comment on Draft Environmental Assessment for Replacement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Invited to Comment on Draft Environmental Assessment for Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site September 1, 2011 - 12:00pm Addthis Media Contact Tim Jackson 208-526-8484 The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared, for a proposal to provide a replacement capability for continued disposal of remote-handled low-level radioactive waste that is generated at the Idaho National Laboratory site.

471

Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement January 6, 2010 - 8:26am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the controls to provide optimum water and air temperature settings for both efficiency and comfort Having a technician perform a combustion-efficiency test Checking the combustion chamber for cracks. Testing for carbon monoxide

472

Replacement of Data from IHS With Those from HPDI  

U.S. Energy Information Administration (EIA) Indexed Site

Replacement of Data from IHS With Those from HPDI Replacement of Data from IHS With Those from HPDI The EIA-914 estimation methodology published in September 2005 used data from IHS, Inc., as a source for calibration of historical monthly production data. As of August 2006, these data have been replaced with data from HPDI, LLC. EIA does not have access to both the full IHS and the HPDI data for an overlap period sufficiently long to allow comprehensive model estimation under both data sources and analysis of the effects on the model estimates of the change from IHS to HPDI. Comparisons of IHS and HPDI data series, however, reveal no evidence of any large or systematic differences between the raw IHS and HPDI estimates that serve as model inputs. Figure 1 illustrates the overall order of magnitude of the differences between

473

Cobalt discovery replaces precious metals as industrial catalyst  

NLE Websites -- All DOE Office Websites (Extended Search)

Cobalt discovery replaces precious metals Cobalt discovery replaces precious metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. Contact Nancy Ambrosiano Communications Office (505) 699-1149 Email Catalysts are also integral to thousands of industrial, synthetic, and

474

Individual differences in preferred steering effort for steer-by-wire systems  

Science Conference Proceedings (OSTI)

Steer-by-wire systems provide drivers with the opportunity to personalize steering settings in vehicles. Studies conducted in the past have indicated that preferences for steering effort, one of the factors which affect steering feel, vary based on individual ... Keywords: human machine interface, steer-by-wire, steering effort, steering feel, steering systems

Swethan Anand; Jacques Terken; Jeroen Hogema

2011-11-01T23:59:59.000Z

475

Parallel automated wire-routing with a number of competing processors  

Science Conference Proceedings (OSTI)

The purpose of the automated wire routing for VLSI and printed circuit board design is to connect a number of terminal pairs distributed throughout wiring plane with net paths which do not intersect each other. Although maze running and line search are ...

Yoshizo Takahashi; Shigetaka Sasaki

1990-06-01T23:59:59.000Z

476

Time and Frequency Response of a Resistance-Wire Aircraft Atmospheric Temperature Sensor  

Science Conference Proceedings (OSTI)

The heat transfer characteristics of an aircraft-mounted resistance-wire atmospheric temperature sensor are modeled to determine the time and frequency responses. The sensor element (Rosemount 102E4AL) consists of a 25-?m-diameter platinum wire ...

G. A. Payne; C. A. Friehe; D. K. Edwards

1994-04-01T23:59:59.000Z

477

Microstructure development in Nb3Sn(Ti) internal tin superconducting wire  

E-Print Network (OSTI)

in the inner and outer rings of the 26-bundle wire (left) and in the 85-bundle wire (right). The voids observed to identify the phases present and X-ray microtomography (XMT) to investigate the void volume and distribution tin [1], powder-in-tube (PIT) [2] and bronze processes [3]. In this study, two commercially produced

Elliott, James

478

Forcing neurocontrollers to exploit sensory symmetry through hard-wired modularity in the game of Cellz  

E-Print Network (OSTI)

Forcing neurocontrollers to exploit sensory symmetry through hard-wired modularity in the game the benefits of different types of modularity by hard-wiring these into evolvable systems. In this paper we to the phenomenon that the interconnection of unrelated parts of a neural network in itself can hamper evolution

Lucas, Simon M.

479

Research on Magnetic Signal Extracting and Filtering of Coal Mine Wire Rope Belt Conveyer Defects  

Science Conference Proceedings (OSTI)

Because of wire rope conveyer belt with high load operating and complex conditions of coal mine, it is prone to cause conveyer belt horizontal rupture. It will bring tremendous hazards for coal mine safe production. Defects of wire rope and joints displacement ...

Qinghua Mao; Hongwei Ma; Xuhui Zhang; Dawei Zhang

2011-01-01T23:59:59.000Z

480

Modeling of wire-on-tube heat exchangers using finite element method  

Science Conference Proceedings (OSTI)

Wire-on-tube heat exchangers are analysed under normal operating conditions (free convection) using finite element method. Galerkin's weighted residual method is used to minimise the errors. The effects of ambient temperatures and mass flow rates of ... Keywords: finite element method, free convection, phase change, wire on-tube heat exchangers

G. A. Quadir; G. M. Krishnan; K. N. Seetharamu

2002-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "wire replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Laboratory Calibration of a Vibrating Wire Device for Measuring Concentrations of Supercooled Liquid Water  

Science Conference Proceedings (OSTI)

Laboratory measurements of supercooled liquid water are made by a vibrating-wire sensor whose frequency of vibration varies according to the mass of ice collected on it. The vibrating-wire system is designed to be placed in the humidity duct of ...

Geoffrey E. Hill

1989-12-01T23:59:59.000Z

482

Critical-Current Reduction in Thin Superconducting Wires Due to Current Crowding  

SciTech Connect

We demonstrate experimentally that the critical current in superconducting NbTiN wires is dependent on their geometrical shape, due to current-crowding effects. Geometric patterns such as 90{degrees} corners and sudden expansions of wire width are shown to result in the reduction of critical currents. The results are relevant for single-photon detectors as well as parametric amplifiers.

Hortensius, H.L.; Driessen, E.F.C.; Klapwijk, T.M.; Berggren, K.K.; Clem, John

2012-05-03T23:59:59.000Z

483

Categorical Exclusion Determinations: West Valley Demonstration Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Valley Demonstration Valley Demonstration Project Categorical Exclusion Determinations: West Valley Demonstration Project Categorical Exclusion Determinations issued by West Valley Demonstration Project. DOCUMENTS AVAILABLE FOR DOWNLOAD July 11, 2013 CX-010718: Categorical Exclusion Determination Replacement Ventilation System for the Main Plant Process Building CX(s) Applied: B6.3 Date: 07/11/2013 Location(s): New York Offices(s): West Valley Demonstration Project December 20, 2012 CX-009527: Categorical Exclusion Determination WVDP-2012-02 Routine Maintenance CX(s) Applied: B1.3 Date: 12/20/2012 Location(s): New York Offices(s): West Valley Demonstration Project August 2, 2012 CX-009528: Categorical Exclusion Determination WVDP-2012-01 WVDP Reservoir Interconnecting Canal Maintenance Activities

484

Computers could aid construction projects  

SciTech Connect

The procedures currently used by engineering companies in planning their work on a segmented basis are a very small step from the development of a computer model encompassing the total scope of a very large engineering construction effort. When the computer model concept has been accepted and implemented, the results are a harmonious relationship between divergent groups, replacing the frequent scrambling and reaction among engineering, procurement, and construction that often takes place in completing a capital project. It is a small step to be able to derive all the benefits of early planning based upon logically developed knowledge. Common scheduling techniques used to provide a scenario for a total coordinated effort could provide a computer model of an entire engineering-construction project. To date, it is this concept that has eluded the industry.

Leon, L.

1983-10-01T23:59:59.000Z

485

Guide for Determining Motor Repair versus Motor Replacement  

Science Conference Proceedings (OSTI)

The Motor Replacement/Refurbishment Guide (MRRG) was written to aid with the determination on whether to repair an existing motor or to purchase a replacement motor. This guideline provides the basic tools necessary to make a determination based upon, but not limited to, the extent of the repair scope and the cost of the repair. This guideline presents a proce