  1. Waste Isolation Pilot Plant (WIPP) Recovery | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Isolation Pilot Plant (WIPP) Recovery Waste Isolation Pilot Plant (WIPP) Recovery The U.S. Department of Energy’s (DOE) Waste Isolation Pilot Plant (WIPP) is a deep geologic repository for permanent disposal of a specific type of waste that is the byproduct of the nation's nuclear defense program. WIPP is the nation's only repository for the disposal of nuclear waste known as transuranic, or TRU, waste. Two incidents occurred in February 2014 that led to the current shutdown of the

  2. WIPP | Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    high resolution video equipment, was specifically designed and built to examine all waste containers in Panel 7, Room 7 in support of the Accident Investigation Board. The boom...

  3. Analysis of Waste Isolation Pilot Plant (WIPP) Samples by the...

    Office of Environmental Management (EM)

    the Savannah River National Laboratory (SRNL) Analysis of Waste Isolation Pilot Plant (WIPP) Samples by the Savannah River National Laboratory (SRNL) This document was used to...

  4. Analysis of Waste Isolation Pilot Plant (WIPP) Underground and...

    Office of Environmental Management (EM)

    the Savannah River National Laboratory (SRNL) Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL) This...

  5. Summary of Waste Isolation Pilot Plant (WIPP) Hypotheses | Department of

    Office of Environmental Management (EM)

    Energy Summary of Waste Isolation Pilot Plant (WIPP) Hypotheses Summary of Waste Isolation Pilot Plant (WIPP) Hypotheses This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. Additional documents referenced and listed in the Phase 2 Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014, report in Attachment F.

  6. Waste Isolation Pilot Plant (WIPP) Source Term Attribution Analysis |

    Office of Environmental Management (EM)

    Department of Energy (WIPP) Source Term Attribution Analysis Waste Isolation Pilot Plant (WIPP) Source Term Attribution Analysis This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. Additional documents referenced and listed in the Phase 2 Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014, report in

  7. Chemical and Radiochemical Analyses of Waste Isolation Pilot Plant (WIPP)

    Office of Environmental Management (EM)

    Samples R-15 C-5 SWB and R-16 C-4 Lip | Department of Energy Chemical and Radiochemical Analyses of Waste Isolation Pilot Plant (WIPP) Samples R-15 C-5 SWB and R-16 C-4 Lip Chemical and Radiochemical Analyses of Waste Isolation Pilot Plant (WIPP) Samples R-15 C-5 SWB and R-16 C-4 Lip This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. The

  8. WIPP Status Report Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report Version: 2.4.3 WDS Instance: prd05.wipp.carlsbad.nm.us Generated on: June 24, 2015 7:29 AM Generated by: REPORT, WEEKLY Total Pages: 3 Selection Criteria Reporting Date...

  9. WIPP | U.S. Department of Energy | Waste Isolation Pilot Plant (WIPP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Community Relations Plan Web Page Click Here Current Contracts Carlsbad Field Office The U.S. Department of Energy Carlsbad Field Office has responsibility for the Waste Isolation Pilot Plant and the NationalTransuranic (TRU) Program. The office's mission is to provide safe, compliant, and efficient characterization, transportation, and disposal of defense-related TRU waste. Its vision is to enable a nuclear future for our country by providing safe and environmentally responsible waste

  10. DOE/WIPP-11-2225 Waste Isolation Pilot Plant Annual Site Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    11-2225 Waste Isolation Pilot Plant Annual Site Environmental Report for 2010 U.S. Department of Energy September 2011 Waste Isolation Pilot Plant Annual Site Environmental Report for 2010 DOE/WIPP-11-2225 2 This page intentionally left blank Waste Isolation Pilot Plant Annual Site Environmental Report for 2010 DOE/WIPP-11-2225 3 2010 Annual Site Environmental Report To our readers: This Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 presents summary environmental

  11. DOE/WIPP-10-2225 Waste Isolation Pilot Plant Annual Site Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP-10-2225 Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 Errata U.S. Department of Energy September 2010 2 Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 DOE/WIPP-10-2225 3 2009 Annual Site Environmental Report To our readers: This Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2009 presents summary environmental data to (1) characterize site environmental management performance, (2) summarize environmental occurrences and

  12. Report for Waste Isolation Pilot Plant (WIPP) UG Sample #3, R15C5...

    Office of Environmental Management (EM)

    of Waste Isolation Pilot Plant Samples: Integrated Summary Report Chemical and Radiochemical Analyses of Waste Isolation Pilot Plant (WIPP) Samples R-15 C-5 SWB and R-16 C-4 Lip...

  13. Waste Isolation Pilot Plant (WIPP) Waste Information System (Public Access)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Container data is available within 14 days after the containerÆs emplacement in the WIPP Repository.

  14. Waste Isolation Pilot Plant (WIPP) Waste Information System (Public Access)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Container data is available within 14 days after the containers emplacement in the WIPP Repository.

  15. Cook-off Experiments with Surrogate Waste Isolation Pilot Plant (WIPP) Drum

    Office of Environmental Management (EM)

    Contents | Department of Energy Cook-off Experiments with Surrogate Waste Isolation Pilot Plant (WIPP) Drum Contents Cook-off Experiments with Surrogate Waste Isolation Pilot Plant (WIPP) Drum Contents This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. The Technical Assessment Team (TAT) has undertaken a deliberative investigation process

  16. ISSUED DOE/WIPP-15-8866 Waste Isolation Pilot Plant Annual

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15-8866 Waste Isolation Pilot Plant Annual Site Environmental Report for 2014 - EMENDED U.S. Department of Energy September 2015 ISSUED This page intentionally left blank 2 ISSUED Waste Isolation Pilot Plant Annual Site Environmental Report for 2014 DOE/WIPP-15-8866 2014 Annual Site Environmental Report To our readers: This Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2014 presents summary environmental data to (1) characterize site environmental management

  17. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Home Page About WIPP Contact Us Search Plans and Reports WIPP Recovery Plan The Waste Isolation Pilot Plant (WIPP) Recovery Plan outlines the necessary steps to resume...

  18. Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP`s environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence.

  19. EIS-0026: Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    Broader source: Energy.gov [DOE]

    The Office of Environmental Restoration and Waste Management prepared this EIS for the Waste Isolation Pilot Plant.

  20. WASTE ISOLATION PILOT PLANT (WIPP): THE NATIONS' SOLUTION TO NUCLEAR WASTE STORAGE AND DISPOSAL ISSUES

    SciTech Connect (OSTI)

    Lopez, Tammy Ann

    2014-07-17

    In the southeastern portion of my home state of New Mexico lies the Chihuahauan desert, where a transuranic (TRU), underground disposal site known as the Waste Isolation Pilot Plant (WIPP) occupies 16 square miles. Full operation status began in March 1999, the year I graduated from Los Alamos High School, in Los Alamos, NM, the birthplace of the atomic bomb and one of the nations main TRU waste generator sites. During the time of its development and until recently, I did not have a full grasp on the role Los Alamos was playing in regards to WIPP. WIPP is used to store and dispose of TRU waste that has been generated since the 1940s because of nuclear weapons research and testing operations that have occurred in Los Alamos, NM and at other sites throughout the United States (U.S.). TRU waste consists of items that are contaminated with artificial, man-made radioactive elements that have atomic numbers greater than uranium, or are trans-uranic, on the periodic table of elements and it has longevity characteristics that may be hazardous to human health and the environment. Therefore, WIPP has underground rooms that have been carved out of 2,000 square foot thick salt formations approximately 2,150 feet underground so that the TRU waste can be isolated and disposed of. WIPP has operated safely and successfully until this year, when two unrelated events occurred in February 2014. With these events, the safety precautions and measures that have been operating at WIPP for the last 15 years are being revised and improved to ensure that other such events do not occur again.

  1. WIPP WASTE MINIMIZATION PROGRAM DESCRIPTION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NOV 2 3 2015 New Mexico Environment Department 2905 Rodeo Park Drive East, Building 1 Santa Fe, New Mexico 87505-6303 Subject: Transm ittal of the Waste Isolation Pilot Plant Project 2015 Waste Minimization Report, Permit Number NM4890139088-TSDF Dear Mr. Kieling: The purpose of this letter is to provide you with the Waste Isolation Pilot Plant (WIPP) Project 2015 Waste Minimization Report. This report, required by and prepared in accordance with the WIPP Hazardous Waste Facility Permit Part 2,

  2. WIPP Nitrate Salt Bearing Waste Container Isolation Plan Implementatio...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Container Isolation Plan Implementation Update May 12, 2015 Panel 6 and Panel 7, Room 7 a. Rollback * Contamination Assessment-This prerequisite is complete and therefore...

  3. Analysis of Waste Isolation Pilot Plant (WIPP) Samples by the Savannah

    Office of Environmental Management (EM)

    River National Laboratory (SRNL) | Department of Energy Samples by the Savannah River National Laboratory (SRNL) Analysis of Waste Isolation Pilot Plant (WIPP) Samples by the Savannah River National Laboratory (SRNL) This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. The Technical Assessment Team (TAT) has undertaken a deliberative

  4. Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples

    Office of Environmental Management (EM)

    by the Savannah River National Laboratory (SRNL) | Department of Energy Underground and MgO Samples by the Savannah River National Laboratory (SRNL) Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL) This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. The Technical

  5. WIPP Nitrate Salt Bearing Waste Container Isolation Plan Implementation Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nitrate Salt Bearing Waste Container Isolation Plan Implementation Update May 12, 2015 Panel 6 and Panel 7, Room 7 a. Rollback * Contamination Assessment-This prerequisite is complete and therefore status updates are no longer required. * Fixing/Decontamination Activities-Decontaminated equipment has been removed from Room 7 of Panel 7 to prepare for Room 7 closure activities. Remaining items in Panel 7, Room 7 include thirteen empty magnesium oxide racks, about 200 roof bolts, nine messenger

  6. Comparative study of Waste Isolation Pilot Plant (WIPP) transportation alternatives

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    WIPP transportation studies in the Final Supplement Environmental Impact Statement for WIPP are the baseline for this report. In an attempt to present the most current analysis, this study incorporates the most relevant data available. The following three transportation options are evaluated for the Disposal Phase, which is assumed to be 20 years: Truck shipments, consisting of a tractor and trailer, with three TRUPACT-IIs or one RH-72B; Regular commercial train shipments consisting of up to three railcars carrying up to 18 TRUPACT-IIs or up to six RH-72Bs; Dedicated train shipments consisting of a locomotive, an idle car, railcars carrying 18 TRUPACT-IIs or six RH-72Bs, another idle car, and a caboose or passenger car with an emergency response specialist. No other cargo is carried. This report includes: A consideration of occupational and public risks and exposures, and other environmental impacts; A consideration of emergency response capabilities; and An extimation of comparative costs.

  7. WIPP WASTE MINIMIZATION PROGRAM DESCRIPTION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlsbad, New Mexico 8822 1 NOV 2 3 2011 Mr. John Kieling , Acting Bureau Chief Hazardous Waste Bureau New Mexico Environme nt Department 2905 Rodeo Park Drive East, Building 1 Santa Fe, New Mexico 87505-6303 Subject: Transmittal of the Waste Isolation Pilot Plant Annual Waste Minimization Report Dear Mr. Kieling: This letter provides the submittal of the Waste Isolation Pilot Plant Annual Waste Minimization Report. This report is required by and has bee n prepared in accordance with the WIPP

  8. Shipment and Disposal of Solidified Organic Waste (Waste Type IV) to the Waste Isolation Pilot Plant (WIPP)

    SciTech Connect (OSTI)

    D'Amico, E. L; Edmiston, D. R.; O'Leary, G. A.; Rivera, M. A.; Steward, D. M.

    2006-07-01

    In April of 2005, the last shipment of transuranic (TRU) waste from the Rocky Flats Environmental Technology Site to the WIPP was completed. With the completion of this shipment, all transuranic waste generated and stored at Rocky Flats was successfully removed from the site and shipped to and disposed of at the WIPP. Some of the last waste to be shipped and disposed of at the WIPP was waste consisting of solidified organic liquids that is identified as Waste Type IV in the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC) document. Waste Type IV waste typically has a composition, and associated characteristics, that make it significantly more difficult to ship and dispose of than other Waste Types, especially with respect to gas generation. This paper provides an overview of the experience gained at Rocky Flats for management, transportation and disposal of Type IV waste at WIPP, particularly with respect to gas generation testing. (authors)

  9. DOE/WIPP 02-3196 - Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization, March 19, 2002

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2-3196 Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization (40 CFR § 761.75[c]) March 19, 2002 Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization DOE/WIPP 02-3196 TABLE OF CONTENTS 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2.0 LOCATION OF THE DISPOSAL FACILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3.0 DETAILED DESCRIPTION OF THE DISPOSAL

  10. WIPP - Pioneering Nuclear Waste Disposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pioneering Nuclear Waste Disposal Cover Page and Table of Contents Closing the Circle The Long Road to WIPP - Part 1 The Long Road to WIPP - Part 2 Looking to the Future Related Reading and The WIPP Team

  11. WIPP Documents - Hazardous Waste Facility Permit (RCRA)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hazardous Waste Facility Permit The WIPP Hazardous Waste Facility Permit (HWFP) effective April 15, 2011 WIPP Hazardous Waste Facility Permit Authorizes the U.S. Department of Energy to manage, store, and dispose of contact-handled and remote-handled transuranic mixed waste at the Waste Isolation Pilot Plant. Mixed waste contains radioactive and chemically hazardous components. Information Repository Documents related to the Hazardous Waste Facility Permit

  12. Correlation of drillhole and shaft logs. Waste Isolation Pilot Plant (WIPP) project, southeastern New Mexico

    SciTech Connect (OSTI)

    Jarolimek, L.; Timmer, M.J.; Powers, D.W.

    1983-03-01

    This report on stratigraphic correlations from drillhole and shaft data along a generally north-south section across the potential extent of underground excavations of the Waste Isolation Pilot Plant (WIPP) facility was prepared as part of the Site Validation Field Program Plan. The results provide (1) input for the report entitled ''Results of Site Validation Experiments,'' (2) input for other WIPP-related investigations, including the Design Validation Program, and (3) a framework for further underground activities at WIPP. In general, this correlation study confirmed previous findings, including: relatively high consistency of thickness and lateral continuity of all beds within the Salado Formation, especially in the host rock interval; gentle, generally south and southeastward dips/slopes of the host rock interval strata; close correspondence between stratigraphic data obtained from the present underground excavations and data derived from the previous investigative drillholes and shafts; and depositional origin of the undulations on the top of Marker Bed (MB) 139 and relatively small variation in its thickness (1.2 to 4.1 feet).

  13. WIPP Receives 500th Waste Shipment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    radioactive waste to WIPP for permanent underground disposal. The shipment contained 28 drums of transuranic waste, bringing the total number of waste containers disposed at WIPP...

  14. Milestones for disposal of radioactive waste at the Waste Isolation Pilot Plant (WIPP) in the United States

    SciTech Connect (OSTI)

    RECHARD,ROBERT P.

    2000-03-01

    The opening of the Waste Isolation Pilot Plant on March 26, 1999, was the culmination of a regulatory assessment process that had taken 25 years. National policy issues, negotiated agreements, and court settlements during the first 15 years of the project had a strong influence on the amount and type of scientific data collected up to this point. Assessment activities before the mid 1980s were undertaken primarily (1) to satisfy needs for environmental impact statements, (2) to satisfy negotiated agreements with the State of New Mexico, or (3) to develop general understanding of selected natural phenomena associated with nuclear waste disposal. In the last 10 years, federal compliance policy and actual regulations were sketched out, and continued to evolve until 1996. During this period, stochastic simulations were introduced as a tool for the assessment of the WIPP's performance, and four preliminary performance assessments, one compliance performance assessment, and one verification performance assessment were performed.

  15. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact Us Search About WIPP The nation's only deep geologic repository for nuclear waste The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) is a deep...

  16. Basic Data Report for Drillholes on the H-19 Hydropad (Waste Isolation Pilot Plant--WIPP)

    SciTech Connect (OSTI)

    Mercer, J.W.; Cole, D.L.; Holt, R.M.

    1998-10-09

    Seven holes were drilled and wells (H-19b0, H-19b2, H-19b3, H-19b4, H-19b5, H-19b6, and H-19b7) were constructed on the H-19 hydropad to conduct field activities in support of the Culebra Transport Program. These wells were drilled and completed on the Waste Isolation Pilot Plant (WIPP) site during February to September 1995. An eighth hole, H-19b1, was drilled but had to be abandoned before the target depth was reached because of adverse hole conditions. The geologic units penetrated at the H-19 location include surficial deposits of Holocene age, rocks from the Dockum Group of Upper Triassic age, the Dewey Lake Redbeds, and Rustler Formation of the Permian age. The Rustler Formation has been further divided into five informal members which include the Forty-niner Member, Magenta Member, Tamarisk Member, Culebra Dolomite Member, and an unnamed lower member. The Rustler Formation, particularly the Culebra Dolomite Member, is considered critical for hydrologic site characterization. The Culebra is the most transmissive saturated unit above the WIPP repository and, as such, is considered to be the most likely pathway for radionuclide transport to the accessible environment in the unlikely event the repository is breached. Seven cores from the Culebra were recovered during drilling activities at the H-19 hydropad and detailed descriptions of these cores were made. On the basis of geologic descriptions, four hydrostratigraphic units were identified in the Culebra cores and were correlated with the mapping units from the WFP air intake shaft. The entire length of H-19b1 was cored and was described in detail. During coring of H-19b1, moisture was encountered in the upper part of the Dewey Lake Redbeds. A 41-ft-thick section of this core was selected for detailed description to qualify the geologic conditions related to perched water in the upper Dewey Lake. In addition to cuttings and core, a suite of geophysical logs run on the drillholes was used to identify and correlate different lithologies among the seven wells.

  17. TRI State Motor Transit to Resume Shipping Waste to WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tri-State Motor Transit to Resume Shipping Transuranic Waste to WIPP CARLSBAD, N.M., January 19, 2001 - Tri-State Motor Transit will resume shipping waste to the Waste Isolation...

  18. Instrumentation of the thermal/structural interactions in situ tests at the Waste Isolation Pilot Plant (WIPP)

    SciTech Connect (OSTI)

    Munson, D.E.; Hoag, D.L.; Blankenship, D.A.; DeYonge, W.F.; Schiermeister, D.M.

    1997-04-01

    The Department of Energy has constructed the Waste Isolation Pilot Plant (WIPP) to develop the technology for the disposal of radioactive waste from defense programs. Sandia National Laboratories had the responsibility for the experimental activities at the WIPP and fielded several large-scale Thermal/Structural Interactions (TSI) in situ tests to validate techniques used to predict repository performance. The instrumentation of these tests involved the placement of over 4,200 gages including room closure gages, borehole extensometers, stress gages, borehole inclinometers, fixed reference gages, borehole strain gages, thermocouples, thermal flux meters, heater power gages, environmental gages, and ventilation gages. Most of the gages were remotely read instruments that were monitored by an automated data acquisition system, but manually read instruments were also used to provide early deformation information and to provide a redundancy of measurement for the remote gages. Instruments were selected that could operate in the harsh environment of the test rooms and that could accommodate the ranges of test room responses predicted by pretest calculations. Instruments were tested in the field prior to installation at the WIPP site and were modified to improve their performance. Other modifications were made to gages as the TSI tests progressed using knowledge gained from test maintenance. Quality assurance procedures were developed for all aspects of instrumentation including calibration, installation, and maintenance. The instrumentation performed exceptionally well and has produced a large quantity of quality information.

  19. Report of biological investigations at the Los Medanos Waste Isolation Pilot Plant (WIPP) area of New Mexico during FY 1978

    SciTech Connect (OSTI)

    Best, T.L.; Neuhauser, S.

    1980-03-01

    The US Department of Energy is considering the construction of a Waste Isolation Pilot Plant (WIPP) in Eddy County, NM. This location is approximately 40 km east of Carlsbad, NM. Biological studies during FY 1978 were concentrated within a 5-mi radius of drill hole ERDA 9. Additional study areas have been established at other sites in the vicinity, e.g., the Gnome site, the salt lakes and several stations along the Pecos River southward from Carlsbad, NM, to the dam at Red Bluff Reservoir in Texas. The precise locations of all study areas are presented and their biology discussed.

  20. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 4, Chapter D, Appendix D1 (beginning), Revision 3

    SciTech Connect (OSTI)

    Lappin, A. R.

    1993-03-01

    The Waste Isolation Pilot Plant (WIPP), which is designed for receipt, handling, storage, and permanent isolation of defense-generated transuranic wastes, is being excavated at a depth of approximately 655 m in bedded halites of the Permian Salado Formation of southeastern New Mexico. Site-characterization activities at the present WIPP site began in 1976. Full construction of the facility began in 1983, after completion of ``Site and Preliminary Design Validation`` (SPDV) activities and reporting. Site-characterization activities since 1983 have had the objectives of updating or refining the overall conceptual model of the geologic, hydrologic, and structural behavior of the WIPP site and providing data adequate for use in WIPP performance assessment. This report has four main objectives: 1. Summarize the results of WIPP site-characterization studies carried out since the spring of 1983 as a result of specific agreements between the US Department of Energy and the State of New Mexico. 2. Summarize the results and status of site-characterization and facility-characterization studies carried out since 1983, but not specifically included in mandated agreements. 3. Compile the results of WIPP site-characterization studies into an internally consistent conceptual model for the geologic, hydrologic, geochemical, and structural behavior of the WIPP site. This model includes some consideration of the effects of the WIPP facility and shafts on the local characteristics of the Salado and Rustler Formations. 4. Discuss the present limitations and/or uncertainties in the conceptual geologic model of the WIPP site and facility. The objectives of this report are limited in scope, and do not include determination of whether or not the WIPP Project will comply with repository-performance criteria developed by the US Environmental Protection Agency (40CFR191).

  1. WIPP Receives First Remote-Handled Waste Shipment From Sandia...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For immediate release WIPP Receives First Remote-Handled Waste Shipment From Sandia Labs CARLSBAD, N.M., December 21, 2011 - The U.S. Department of Energy's (DOE) Waste Isolation...

  2. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3/3/16 WIPP Home Page About WIPP Contact Us Search The supplemental ventilation system installed in the air intake drift WIPP's new hybrid (diesel/electric) bolter in the underground mine A drill being run at WIPP's new Emergency Operations Center Emergency response vehicles stationed in the WIPP underground WIPP Update March 3, 2016 Interim Ventilation System Tie-in Completed IVS Ducts Early this week sub-contractors at the Waste Isolation Pilot Plant (WIPP) completed the "tie in" of

  3. January 23, 2007: WIPP receives first shipment of waste | Department of

    Energy Savers [EERE]

    Energy 23, 2007: WIPP receives first shipment of waste January 23, 2007: WIPP receives first shipment of waste January 23, 2007: WIPP receives first shipment of waste January 23, 2007 The Department's Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, receives (pdf) its first shipment of remote-handled (RH) transuranic (TRU) radioactive waste. The waste, which consisted of three 30-gallon drums of radioactive debris waste and originated at DOE's Idaho National Laboratory, was

  4. Numerical simulation of ground-water flow in the Culebra dolomite at the Waste Isolation Pilot Plant (WIPP) site: Second interim report

    SciTech Connect (OSTI)

    LaVenue, A.M.; Haug, A.; Kelley, V.A.

    1988-03-01

    This hydrogeologic modeling study has been performed as part of the regional hydrologic characterization of the Waste Isolation Pilot Plant (WIPP) Site in southeastern New Mexico. The study resulted in an estimation of the transmissivity distrubution, hydraulic potentials, flow field, and fluid densities in the Culebra Dolomite Member of the Permian Rustler Formation at the WIPP site. The three-dimensional finite-difference code SWIFT-II was employed for the numerical modeling, using variable-fluid-density and a single-porosity formulation. The modeled area includes and extends beyond the WIPP controlled zone (Zone 3). The work performed consisted of modeling the hydrogeology of the Culebra using two approaches: (1) steady-state modeling to develop the best estimate of the undisturbed head distribution, i.e., of the situation before sinking if the WIPP shafts, which began in 1981; and (2) superimposed transient modeling of local hydrologic responses to excavation of the three WIPP shafts at the center of the WIPP site, as well as to various well tests. Boundary conditions (prescribed constant fluid pressures and densities) were estimated using hydraulic-head and fluid-density data obtained from about 40 wells at and near the WIPP site. The transient modeling used the calculated steady-state freshwater heads as initial conditions. 107 refs., 112 figs., 22 tabs.

  5. Analysis of Waste Isolation Pilot Plan (WIPP) Underground and MGO Samples by the Savannah River National Laboratory (SRNL)

    SciTech Connect (OSTI)

    Young, J.; Ajo, H.; Brown, L.; Coleman, C.; Crump, S.; Diprete, C.; Diprete, D.; Ekechukwu, A.; Gregory, C.; Jones, M.; Missimer, D.; O'Rourke, P.; White, T.

    2014-12-31

    Analysis of the recent WIPP samples are summarized in this report; WIPP Cam Filters 4, 6, 9 (3, 7, 11 were analyzed with FAS-118 in a separate campaign); WIPP Drum Lip R16 C4; WIPP Standard Waste Box R15 C5; WIPP MgO R16 C2; WIPP MgO R16 C4; WIPP MgO R16 C6; LANL swipes of parent drum; LANL parent drum debris; LANL parent drum; IAEA Swipe; Unused undeployed Swheat; Unused undeployed MgO; and Masselin cloth smears. Analysis showed that the MgO samples were very pure with low carbonate and water content. Other samples showed the expected dominant presence of Mg, Na and Pb. Parent drum debris sample was mildly acidic. Interpretation of results is not provided in this document, but rather to present and preserve the analytical work that was performed. The WIPP Technical Analysis Team is responsible for result interpretation which will be written separately.

  6. EIS-0026-S: Supplemental Environmental Impact Statement Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Office of Environmental Restoration and Waste Management prepared this statement to update the environmental record established during preparation of DOE/EIS-0026, Waste Isolation Pilot Plant, by evaluating the environmental impacts associated with new information, new circumstances, and modifications to the actions evaluated in DOE/EIS-0026 that were proposed in light of the new information.

  7. WIPP Receives Waste Characterized With Mobile System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transuranic waste. Characterization is the process where the contents of waste drums are checked and approved before shipment to and disposal at WIPP. "This is a major...

  8. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Releases December 29, 2015 Emergency Operations Center Level 1 Activation August 4, 2015 Event News Release #4 Event News Release #3 Event News Release #2 Event News Release #1 Joint Information Center Activated at WIPP Emergency Operations Center Activated at WIPP June 02, 2015 Nitrate Waste Stream Isolated at WIPP December 22, 2014 CBFO Manager Letter #14 November 04, 2014 CBFO Manager Letter #13 September 30, 2014 Department of Energy Releases WIPP Recovery Plan June 18, 2014 CBFO

  9. Cook-off Experiments with Surrogate Waste Isolation Pilot Plant...

    Office of Environmental Management (EM)

    Surrogate WIPP Drum Contents More Documents & Publications Probative Investigation of the Thermal Stability of Wastes Involved in February 2014 Waste Isolation Pilot Plant (WIPP)...

  10. Resource conservation and recovery act draft hazardous waste facility permit: Waste Isolation Pilot Plant (WIPP). Attachments: Volume 4 of 4

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    Volume IV contains the following attachments for Module IV: VOC monitoring plan for bin-room tests (Appendix D12); bin emission control and VOC monitoring system drawings; bin scale test room ventilation drawings; WIPP supplementary roof support system, underground storage area, room 1, panel 1, DOE/WIPP 91-057; and WIPP supplementary roof support system, room 1, panel 1, geotechnical field data analysis bi-annual report, DOE/WIPP 92-024.

  11. Getting waste ready for shipment to the WIPP: integration of characterization and certification activities

    SciTech Connect (OSTI)

    Sinkule, B.; Knudsen, K.; Rogers, P.

    1996-06-01

    The Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC) serve as the primary directive for assuring the safe handling, transportation, and disposal of transuranic (TRU) waste generated at Department of Energy (DOE) sites. The WIPP WAC address fulfillment of WIPP`s operational safety and performance assessment criteria, compliance with Resource Conservation and Recovery Act (RCRA) requirements, and preparation of waste packages that meet all transportation criteria. At individual generator sites, preparation of transuranic waste for final disposal at WIPP includes characterizing the waste to meet the requirements of the transuranic Waste Characterization Quality Assurance Program Plan (QAPP) and certifying waste containers to meet the WIPP WAC and the Transuranic Package Transporter-II Authorized Methods for Payload Control (TRAMPAC). This paper compares the quality assurance and quality control requirements specified in the WIPP WAC, QAPP, and TRAMPAC and discusses the potential to consolidate activities to comply with the TRU waste characterization and certification program requirements.

  12. Sandia Energy - Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Isolation Pilot Plant Home Analysis A photo of Drum 68660 during the WIPP incident investigation. Permalink Gallery Waste Isolation Pilot Plant Technical Assessment Report...

  13. WIPP Uses Recovery Act Funding to Reduce Nuclear Waste Footprint

    Office of Energy Efficiency and Renewable Energy (EERE)

    CARLSBAD, N.M., August 1, 2011 The U.S. Department of Energys (DOEs) Carlsbad Field Office (CBFO) reduced the nuclear waste footprint by using American Recovery and Reinvestment Act funds to expedite the clean up of five transuranic (TRU) waste storage sites and to make important infrastructure improvements at the Waste Isolation Pilot Plant (WIPP).

  14. Appendix DATA Attachment B: WIPP Waste Containers and Emplacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Attachment B: WIPP Waste Containers and Emplacement United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Appendix DATA-2014 Attachment B: WIPP Waste Containers and Emplacement Table of Contents DATA-B-1.0 Authorized Waste Emplacement Containers DATA-B-1.1 Container Descriptions DATA-B-1.2 Dunnage Containers DATA-B-1.3 Payload Descriptions DATA-B-1.4 Emplacement Configurations DATA-B-2.0 References List of Figures Figure DATA-B- 1. 55-gal Drum

  15. Natural-analog studies for partial validation of conceptual models of radionuclide retardation at the Waste Isolation Pilot Plant (WIPP)

    SciTech Connect (OSTI)

    Ward, D.B.; Brookins, D.G. . Dept. of Geology); Siegel, M.D.; Lambert, S.J. )

    1990-01-01

    Transport by groundwater within the Culebra Dolomite, an aquifer above the Waste Isolation Pilot Plant (WIPP), is the most probable mechanism for long-term release of radionuclides to the accessible environment. Radionuclides could be retarded by sorption if the groundwater is exposed to sufficient amounts of fracture-lining clays. In this natural-analog study, distributions of U and trace metals have been examined to constrain the strength of clay/solute interactions within the Culebra. Uranium solid/liquid distribution ratios, calculated from U concentrations of groundwaters and consanguineous fracture-filling clays, range from {approximately}80 to 800 m{ell}/g and imply retardation factors of 60 to 500 using a fracture-flow model. Retardation factors inferred from uranium-series disequilibria and {sup 14}C ages in Culebra groundwaters alone are much lower ({approximately}10), implying that clays may contain a significant unreactive component of U. Such a possibility is corroborated by Rb/Sr ages; these imply long-term stability of the clays,with resetting occurring more than 250 Ma ago. Factor analysis and mass-balance calculations suggest, however, that Mg-rich clays are dissolving in Pleistocene-age groundwaters and/or are converting to Na-rich smectites, and that B and Li are taken up from the water by the clays. Apparently, the solution chemistry reflects gradual equilibration of clays with groundwater, but thus far the bulk of the clays remain structurally intact. Measurements of the distribution of U in the Culebra will be more meaningful if the inert and exchangeable components of the U content of the clays can be quantified. 26 refs., 3 figs., 2 tabs.

  16. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    provided by the U.S. Environmental Protection Agency. The Karst and Related Issues at the Waste Isolation Pilot Plant - A paper addressing the issue of karst at WIPP by Dr. Lokesh...

  17. State of New Mexico Issues Permit For Remote-Handled Waste at WIPP |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy New Mexico Issues Permit For Remote-Handled Waste at WIPP State of New Mexico Issues Permit For Remote-Handled Waste at WIPP October 16, 2006 - 1:35pm Addthis Enables DOE to Permanently Move Waste to the WIPP Repository for Safe Disposal CARLSBAD, NM - U.S. Department of Energy (DOE) today announced that the New Mexico Environment Department (NMED) issued a revised hazardous waste facility permit for DOE's Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The

  18. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Chapter E, Appendix E1, Chapter L, Appendix L1: Volume 12, Revision 3

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP) Project was authorized by the US Department of Energy 5 (DOE) National Security and Military Applications of the Nuclear Energy Authorization Act of 1980 (Public Law 96-164). Its legislative mandate is to provide a research and development facility to demonstrate the safe disposal of radioactive waste resulting from national defense programs and activities. To fulfill this mandate, the WIPP facility has been designed to perform scientific investigations of the behavior of bedded salt as a repository medium and the interactions between the soft and radioactive wastes. In 1991, DOE proposed to initiate a experimental Test Phase designed to demonstrate the performance of the repository. The Test Phase activities involve experiments using transuranic (TRU) waste typical of the waste planned for future disposal at the WIPP facility. Much of this TRU waste is co-contaminated with chemical constituents which are defined as hazardous under HWMR-7, Pt. II, sec. 261. This waste is TRU mixed waste and is the subject of this application. Because geologic repositories, such as the WIPP facility, are defined under the Resource Conservation and Recovery Act (RCRA) as land disposal facilities, the groundwater monitoring requirements of HWMR-7, PLV, Subpart X, must be addressed. HWMR-7, Pt. V, Subpart X, must be addressed. This appendix demonstrates that groundwater monitoring is not needed in order to demonstrate compliance with the performance standards; therefore, HWMR-7, Pt.V, Subpart F, will not apply to the WIPP facility.

  19. WIPP Nitrate Updates 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 WIPP Nitrate Salt Bearing Waste Container Isolation Plan Implementation Update, July 23, 2015 Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF WIPP Nitrate Salt...

  20. Hi-Res WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Isolation Pilot Plant The WIPP facility is located southeast of Carlsbad, N.M. 26miles are employed at WIPP, which includes employees supporting waste characterization and packaging activities at the generator sites. 1,000 people The U.S. Department of Energy's (DOE) WIPP facility has safely disposed of the nation's defense related transuranic (TRU) radioactive waste for the past WIPP began operations in March 1999 WIPP is the only federal repository for the nation's TRU waste TRU waste

  1. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 5, Chapter D, Appendix D1 (conclusion), Revision 3

    SciTech Connect (OSTI)

    Cook, Neville G.W.; Heuze, Francois E.; Miller, Hamish D.S.; Thoms, Robert L.

    1993-03-01

    The reference design for the underground facilities at the Waste Isolation Pilot Plant was developed using the best criteria available at initiation of the detailed design effort. These design criteria are contained in the US Department of Energy document titled Design Criteria, Waste Isolation Pilot Plant (WIPP). Revised Mission Concept-IIA (RMC-IIA), Rev. 4, dated February 1984. The validation process described in the Design Validation Final Report has resulted in validation of the reference design of the underground openings based on these criteria. Future changes may necessitate modification of the Design Criteria document and/or the reference design. Validation of the reference design as presented in this report permits the consideration of future design or design criteria modifications necessitated by these changes or by experience gained at the WIPP. Any future modifications to the design criteria and/or the reference design will be governed by a DOE Standard Operation Procedure (SOP) covering underground design changes. This procedure will explain the process to be followed in describing, evaluating and approving the change.

  2. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revision 3

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws.

  3. Waste Isolation Pilot Plant Recovery Update | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Topic: J. R. Stroble CBFO, Provided Information on the February 5, 2014 Truck Fire and the February 14, 2014 Radiological Incident at WIPP. PDF icon WIPP Update - November 19, 2014 More Documents & Publications WIPP Recovery Progress Resuming Operations at WIPP Waste Isolation Pilot Plant Nitrate Salt Bearing Waste Container Isolation Plan

  4. WIPP Privacy Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Privacy Policy and Disclaimers NOTICE: The Waste Isolation Pilot Plant (WIPP) Internet Server is provided as a service of the Department of Energy (DOE) for distribution of publicly available information and is maintained by the WIPP for the National Transuranic Waste Program. The WIPP is an agency of the Federal Government of the United States of America. Use of the WIPP Internet Server is intended only for the retrieval of information available through WIPP Internet documents. Only

  5. Resource Conservation and Recovery Act Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 7: Revision 1.0

    SciTech Connect (OSTI)

    Not Available

    1992-07-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards.

  6. Resource Conservation and Recovery Act: Part B, Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revison 1.0

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements.

  7. Chemical and Radiochemical Analyses of Waste Isolation Pilot...

    Office of Environmental Management (EM)

    Analyses of Waste Isolation Pilot Plant (WIPP) Samples R-15 C-5 SWB and R-16 C-4 Lip Chemical and Radiochemical Analyses of Waste Isolation Pilot Plant (WIPP) Samples...

  8. Public invited to comment on additional proposed modications to WIPP hazardous waste permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Public Invited to Comment on Additional Proposed Modifications To WIPP Hazardous Waste Permit CARLSBAD, N.M., April 26, 2000 - The public is invited to comment on additional proposed modifications to the hazardous waste facility permit for the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). Earlier this month, DOE and the Westinghouse Waste Isolation Division requested -- through three Class 2 permit modification submittals -- that the New Mexico Environment Department

  9. DOE and westinghouse to hold public meetings on proposed modificatons to WIPP hazadous waste permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Westinghouse to Hold Public Meetings On Proposed Modifications to WIPP Hazardous Waste Permit CARLSBAD, N.M., April 7, 2000 - The public is invited to comment on proposed modifications to the hazardous waste facility permit for the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). On April 5, DOE and the Westinghouse Waste Isolation Division submitted three proposed permit modifications to the New Mexico Environment Department (NMED). The modifications do not concern

  10. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    What happened at WIPP in February 2014 Burned Truck Salt hauling truck after the fire Two isolated events took place at the Waste Isolation Pilot Plant (WIPP) in February. On February 5, a salt haul truck caught fire. Workers were evacuated, and the underground portion of WIPP was shut down. Six workers were treated for smoke inhalation. Nine days later, late in the evening of February 14, a second, unrelated event occurred when a continuous air monitor (CAM) alarmed during the night shift. Only

  11. WIPP Update and Status of Recovery | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    WIPP Update and Status of Recovery More Documents & Publications WIPP Recovery Information Waste Isolation Pilot Plant Update and Status of Recovery Waste Isolation Pilot Plant...

  12. Cookoff modeling of a WIPP waste drum (68660) | Department of...

    Office of Environmental Management (EM)

    Cookoff modeling of a WIPP waste drum (68660) Cookoff modeling of a WIPP waste drum (68660) This document was used to determine facts and conditions during the Department of Energy...

  13. An in-line thermal-neutron coincidence counter for WIPP (Waste Isolation Pilot Plant) certification measurements

    SciTech Connect (OSTI)

    Krick, M.S.; Osborne, L.; Polk, P.J.; Atencio, J.D.; Bjork, C.

    1989-10-01

    A custom-designed, in-line, thermal-neutron coincidence counter has been constructed for the certification of plutonium waste intended for storage at the Waste Isolation Pilot Plant. The mechanical and electrical components of the system and its performance characteristics are described. 6 refs., 16 figs.

  14. Waste Isolation Pilot Plant Typifies Optimizing Resources to...

    Office of Environmental Management (EM)

    Plant Typifies Optimizing Resources to Maximize Results Waste Isolation Pilot Plant ... HalfPACT transportation packages on a Waste Isolation Pilot Plant (WIPP) truck are ...

  15. Development and field placement of an expansive salt-saturated concrete (ESC) for the Waste Isolation Pilot Plant (WIPP). Final report

    SciTech Connect (OSTI)

    Wakeley, L.D.; Walley, D.M.

    1986-09-01

    An expansive salt-saturated concrete (ESC) was proportioned for placement underground in halite rock at the Waste Isolation Pilot Plant (WIPP) site, near Carlsbad, New Mexico. Requirements for this concrete were: (1) to be chemically compatible with the host rock; (2) to remain pumpable for four hours: (3) to give net volume increase beginning at an early age, and continuing until creep closure of the salt assures sealing at the rock interface; and (4) to cure to a solid with extremely low permeability and fairly high strength. ESC was proportioned and placed underground at the WIPP in two successful field tests during FY 85 and FY 86. This report is the first of three reports about this concrete. It describes (1) the development of ESC in the laboratory, and (2) the mixture properties prior to final set. It summarizes field-placement activities in July 1985 and February 1986, when ESC was placed in test holes underground at the WIPP for two series of Small-Scale Seal Performance Tests (SSSPT). It gives data from tests of expansive behavior of the concrete at early ages and under simulated repository conditions. The second report will describe expansive behavior of ESC relative to several variables that could have an impact on its field performance and long-term stability, as determined during laboratory testing. It also will discuss possible explanations of the rather extraordinary suite of properties exhibited by ESC, as controlled by its chemical composition. The third report will describe laboratory studies of the mechanism of set retardation in a grout derived from this concrete.

  16. WIPP Hazardous Waste Facility Permit - 2008 Update

    SciTech Connect (OSTI)

    Kehrman, R.F.; Most, W.A.

    2008-07-01

    Important new changes to the Hazardous Waste Facility Permit (HWFP) were implemented during 2007. The challenge was to implement these changes without impacting shipping schedules. Many of the changes required advanced preparation and coordination in order to transition to the new waste analysis paradigm, both at the generator sites and at the WIPP without interrupting the flow of waste to the disposal facility. Not only did aspects of waste characterization change, but also a new Permittees' confirmation program was created. Implementing the latter change required that new equipment and facilities be obtained, personnel hired, trained and qualified, and operating procedures written and approved without interruption to the contact-handled (CH) transuranic (TRU) waste shipping schedule. This was all accomplished successfully with no delayed or cancelled shipments. Looking forward to 2008 and beyond, proposed changes that will deal with waste in the DOE TRU waste complex is larger than the TRUPACT-IIs can handle. Size reduction of the waste would lead to unnecessary exposure risk and ultimately create more waste. The WIPP is working to have the Nuclear Regulatory Commission (NRC) certify the TRUPACT-III. The TRUPACT-III will be able to accommodate larger sized TRU mixed waste. Along with this new NRC-certified shipping cask, a new disposal container, the Standard Large Box, must be proposed in a permit modification. Containers for disposal of TRU mixed waste at the WIPP must meet the DOT 7A standards and be filtered. Additionally, as the TRUPACT-III/Standard Large Box loads and unloads from the end of the shipping cask, the proposed modification will add horizontal waste handling techniques to WIPP's vertical CH TRU waste handling operations. Another major focus will be the Hazardous Waste Facility Permit reapplication. The WIPP received its HWFP in October of 1999 for a term of ten years. The regulations and the HWFP require that a new permit application be submitted 180-days before the expiration date of the HWFP. At that time, the WIPP will request only one significant change, the permitting of Panel 8 to receive TRU mixed waste. (author)

  17. WIPP waste characterization program sampling and analysis guidance manual

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Waste Characterization Program Sampling and Analysis Guidance Manual (Guidance Manual) provides a unified source of information on the sampling and analytical techniques that enable Department of Energy (DOE) facilities to comply with the requirements established in the current revision of the Quality Assurance Program Plan (QAPP) for the WIPP Experimental-Waste Characterization Program (the Program). This Guidance Manual includes all of the sampling and testing methodologies accepted by the WIPP Project Office (DOE/WPO) for use in implementing the Program requirements specified in the QAPP. This includes methods for characterizing representative samples of transuranic (TRU) wastes at DOE generator sites with respect to the gas generation controlling variables defined in the WIPP bin-scale and alcove test plans, as well as waste container headspace gas sampling and analytical procedures to support waste characterization requirements under the WIPP test program and the Resource Conservation and Recovery Act (RCRA). The procedures in this Guidance Manual are comprehensive and detailed and are designed to provide the necessary guidance for the preparation of site specific procedures. The use of these procedures is intended to provide the necessary sensitivity, specificity, precision, and comparability of analyses and test results. The solutions to achieving specific program objectives will depend upon facility constraints, compliance with DOE Orders and DOE facilities' operating contractor requirements, and the knowledge and experience of the TRU waste handlers and analysts. With some analytical methods, such as gas chromatography/mass spectrometry, the Guidance Manual procedures may be used directly. With other methods, such as nondestructive/destructive characterization, the Guidance Manual provides guidance rather than a step-by-step procedure.

  18. Microsoft Word - Los Alamos National Laboratory ships remote-handled transuranic waste to WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Los Alamos National Laboratory Ships Remote-Handled Transuranic Waste to WIPP CARLSBAD, N.M., June 3, 2009 - Cleanup of the nation's defense-related transuranic (TRU) waste has reached an important milestone. Today, the first shipment of remote-handled (RH) TRU waste from Los Alamos National Laboratory (LANL) in New Mexico arrived safely at the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) in the southeast corner of the state. "Shipping this waste to WIPP is important

  19. Microsoft Word - INL Waste Stream Cleared for Shipment to WIPP.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho National Laboratory Waste Stream Cleared For Shipment to WIPP CARLSBAD, N.M., December 12, 2006 - The U.S. Department of Energy (DOE) has authorized the Idaho National Laboratory (INL) to restart shipments from the waste stream that was suspended from transport to the Waste Isolation Pilot Plant (WIPP) on November 26, 2006. DOE initiated the suspension after liquid in excess of allowable limits was identified in a single waste drum during confirmation activities at INL. Corrective actions

  20. Ground Control Progress Continues at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 4, 2015 Ground Control Progress Continues at WIPP Underground Operations Personnel at the Waste Isolation Pilot Plant (WIPP) have made significant progress since resuming...

  1. WIPP WASTE MINIMIZATION PROGRAM DESCRIPTION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    salt * Paper * Plastic * Tires * Toner cartridges * Used oil and oil filters * Wood pallets * Wood waste (spools, timbers, and crating materials) In FY 2015, 170 metric tons of...

  2. WIPP WASTE MINIMIZATION PROGRAM DESCRIPTION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Mexico 8822 1 NOV 2 3 2011 Mr. John Kieling , Acting Bureau Chief Hazardous Waste Bureau New Mexico Environme nt Department 2905 Rodeo Park Drive East, Building 1 Santa...

  3. WIPP Documents - Nuclear Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Safety DOE/WIPP-07-3372, Revision 4 WIPP Documented Safety Analysis Approved November 2013 The Documented Safety Analysis addresses all hazards (both radiological and nonradiological) and the controls necessary to provide adequate protection to the public, workers, and the environment. The WIPP DSA demonstrates the extent to which the Waste Isolation Pilot Plant can be operated safely with respect to workers, the public, and the environment. DOE/WIPP-07-3373, Revision 4 WIPP Technical

  4. Laboratory increases shipments of waste to WIPP repository

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab increases shipments to WIPP repository Laboratory increases shipments of waste to WIPP repository The campaign will eliminate LANL's existing backlog of approximately 1,500 drums of legacy transuranic waste awaiting shipment to WIPP. February 11, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics

  5. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protective Actions Actions to Protect Workers, Public and the Environment The February 14 radioactivity release was a watershed event for the Waste Isolation Pilot Plant (WIPP). It was the first accident of its kind in the 15-year operating history of the transuranic nuclear waste repository. No workers were underground when the release occurred. There were 11 workers on the night shift at the time of the release and two additional employees entered the site in response to the accident. These 13

  6. Waste Isolation Pilot Plant Nitrate Salt Bearing Waste Container Isolation

    Broader source: Energy.gov (indexed) [DOE]

    Plan | Department of Energy The purpose of this document is to provide the Plan required by the New Mexico Environment Department Administrative Order 05-20001 issued on May 20, 2014 to the U. S. Department of Energy and Nuclear Waste Partnership LLC. The Order, at paragraph 22, requires the Permittees to submit a WIPP Nitrate Salt Bearing Waste Container Isolation Plan for identified nitrate salt bearing waste disposed in the Waste Isolation Pilot Plant underground disposal facility. PDF

  7. WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 News Releases December 1 State Renews WIPP Facility Permit November 18 National TRU Program Director Selected November 18 Waste Isolation Pilot Plant Receives Second EPA...

  8. Site Programs & Cooperative Agreements: Waste Isolation Pilot Plant |

    Energy Savers [EERE]

    Department of Energy Waste Isolation Pilot Plant Site Programs & Cooperative Agreements: Waste Isolation Pilot Plant Waste Isolation Pilot Plant (WIPP) The DOE Carlsbad Field Office funds a number of tribes and pueblos along the WIPP transportation corridors. The funds are for first responder training and support. The following tribes and pueblos are involved with WIPP transportation corridors: Acoma Pueblo Nambe Pueblo Navajo Nation Pojoaque Pueblo San Ildefonso Pueblo Laguna Pueblo

  9. The Nevada Test Site Legacy TRU Waste - The WIPP Central Characterization Project

    SciTech Connect (OSTI)

    Norton, J. F.; Lahoud, R. G.; Foster, B. D.; VanMeighem, J.

    2003-02-25

    This paper discusses the Central Characterization Project (CCP) designed by the Waste Isolation Pilot Plant (WIPP) to aid sites, especially those sites with small quantities of transuranic (TRU) waste streams, in disposing of legacy waste at their facility. Because of the high cost of contracting vendors with the characterization capabilities necessary to meet the WIPP Waste Acceptance Criteria, utilizing the CCP is meant to simplify the process for small quantity sites. The paper will describe the process of mobilization of the vendors through CCP, the current production milestones that have been met, and the on-site lessons learned.

  10. Waste Isolation Pilot Plant Transuranic Waste Baseline inventory report. Volume 2. Revision 1

    SciTech Connect (OSTI)

    1995-02-01

    This document is the Baseline Inventory Report for the transuranic (alpha-bearing) wastes stored at the Waste Isolation Pilot Plant (WIPP) in New Mexico. Waste stream profiles including origin, applicable EPA codes, typical isotopic composition, typical waste densities, and typical rates of waste generation for each facility are presented for wastes stored at the WIPP.

  11. WIPP Recovery Progress | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Topic: J. R. Stroble CBFO, Provided Information on the Status of the Recovery Effort at the WIPP Site. PDF icon WIPP Update - March 25, 2015 More Documents & Publications Waste Isolation Pilot Plant Recovery Update Resuming Operations at WIPP Waste Isolation Pilot Plant Nitrate Salt Bearing Waste Container Isolation Plan

  12. Radiological Release Event at the Waste Isolation Pilot Plant...

    Broader source: Energy.gov (indexed) [DOE]

    radiological release occurred at the Department of Energy Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Because access to the underground was restricted following...

  13. WIPP AIB Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP AIB Report WIPP Accident Investigation Board Report Department of Energy (DOE) Issues Accident Investigation Board (AIB) Report on February 14 Incident at the Waste Isolation Pilot Project (WIPP) in Carlsbad, New Mexico June 30, 2014 Drums at Los Alamos containing nitrate salt waste Drums at Los Alamos containing nitrate salt waste were placed inside steel standard waste boxes, which were then secured inside a steel and glass structure in a dome that has temperature control and fire

  14. WIPP Activates Emergency Operations Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 5, 2015 WIPP Activates Emergency Operations Center At approximately 7:00 p.m. MDT on Tuesday, August 4, the Waste Isolation Pilot Plant (WIPP) activated the Emergency...

  15. WIPP Receives Top Safety Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Receives Top Safety Award CARLSBAD, N.M., November 10, 2011 - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) received top accolades from New...

  16. Waste acceptance criteria for the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    NONE

    1996-04-01

    The Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC), DOE/WIPP-069, was initially developed by a U.S. Department of Energy (DOE) Steering Committee to provide performance requirements to ensure public health and safety as well as the safe handling of transuranic (TRU) waste at the WIPP. This revision updates the criteria and requirements of previous revisions and deletes those which were applicable only to the test phase. The criteria and requirements in this document must be met by participating DOE TRU Waste Generator/Storage Sites (Sites) prior to shipping contact-handled (CH) and remote-handled (RH) TRU waste forms to the WIPP. The WIPP Project will comply with applicable federal and state regulations and requirements, including those in Titles 10, 40, and 49 of the Code of Federal Regulations (CFR). The WAC, DOE/WIPP-069, serves as the primary directive for assuring the safe handling, transportation, and disposal of TRU wastes in the WIPP and for the certification of these wastes. The WAC identifies strict requirements that must be met by participating Sites before these TRU wastes may be shipped for disposal in the WIPP facility. These criteria and requirements will be reviewed and revised as appropriate, based on new technical or regulatory requirements. The WAC is a controlled document. Revised/changed pages will be supplied to all holders of controlled copies.

  17. Test Plan: WIPP bin-scale CH TRU waste tests

    SciTech Connect (OSTI)

    Molecke, M.A.

    1990-08-01

    This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.

  18. Resource Conservation and Recovery Act, Part B Permit Application [of the Waste Isolation Pilot Plant (WIPP)]. Volume 2, Revision 1.0

    SciTech Connect (OSTI)

    Not Available

    1990-12-31

    This report, Part B ( Vol. 2) of the permit application for the WIPP facility, contains information related to the WIPP site on hydrology, geology, maps, and rock salt properties.

  19. Waste Isolation Pilot Plant Status and Plans - 2010 | Department...

    Office of Environmental Management (EM)

    Status and Plans - 2010 Waste Isolation Pilot Plant Status and Plans - 2010 Overview of WIPP presented by Dr. Dave Moody. Waste Isolation Pilot Plant Status and Plans - 2010 More...

  20. WIPP | Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2015 Wouldn't it be cheaper to just fill this mine with salt, walk away, and build a brand new mine with a better ventilation system? Or is permitting the main problem with...

  1. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 6, Chapter D, Appendices D4--D13: Revision 1.0

    SciTech Connect (OSTI)

    Not Available

    1991-12-31

    This report (Vol. 6) for the WIPP facility contains appendices on the following information: Site characterization; general geology; ecological monitoring; and chemical compatibility of waste forms and container materials.

  2. WIPP Facility Work Plan for Solid Waste Management Units

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  3. Waste Isolation Pilot Plant EMHQ Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Isolation Pilot Plant EMHQ Statement Waste Isolation Pilot Plant EMHQ Statement Topic: Approved Statement for WIPP Recovery Effort. PDF icon WIPP Statement - March 12, 2014 More Documents & Publications Nuke Watch New Mexico Perspective on MDA G Cap and Cover Treatment of Remediated Nitrate Salts Pueblo De San Ildefonso Department of Environmental and Cultural Preservation Program Overview 2015

  4. WIPP UPDATE: April 7, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2014 EPA to install additional air monitors This week, Environmental Protection Agency (EPA) employees will arrive at the Waste Isolation Pilot Plant (WIPP) to install...

  5. Resuming Operations at WIPP | Department of Energy

    Energy Savers [EERE]

    Resuming Operations at WIPP Resuming Operations at WIPP Presentation from the 2015 DOE National Cleanup Workshop by Frank Marcinowski, Acting Associate Principal Deputy Assistant Secretary for The Office of Environmental Management. PDF icon Resuming Operations at WIPP More Documents & Publications WIPP Recovery Progress Waste Isolation Pilot Plant Update for January 2016 Phase II Accident Investigation Board Briefing

  6. LANL Resumes Shipments to WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL Resumes Shipments to WIPP CARLSBAD, N.M., April 17, 2001 - On April 19, the U.S. Department of Energy's (DOE) Los Alamos National Laboratory (LANL) will resume shipments of transuranic waste to DOE's Waste Isolation Pilot Plant (WIPP). In March 1999, LANL became the first DOE site to send defense-generated transuranic radioactive waste to WIPP. LANL completed its first 17 waste shipments on September 22, 1999. Transuranic waste consists of clothing, tools, rags, debris, residues, and other

  7. WIPP AIB Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    on February 14 Incident at the Waste Isolation Pilot Project (WIPP) in Carlsbad, New Mexico June 30, 2014 Drums at Los Alamos containing nitrate salt waste Drums at Los Alamos...

  8. WIPP - Photo Gallery

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gallery Shortcuts WIPP Site Transportation Contact-Handled TRU Waste Remote-Handled TRU Waste Mining Photo Gallery Click on a thumbnail image to see a larger version of the photographs. WIPP Site Back to top The entrance to the Waste Isolation Pilot Plant near Carlsbad, N.M. The entrance to the Waste Isolation Pilot Plant near Carlsbad, N.M. The Waste Isolation Pilot Plant at sunrise. The Waste Isolation Pilot Plant at sunrise. A view of the Waste Isolation Pilot Plant from a distance. A view of

  9. WIPP Recovery Effort

    Broader source: Energy.gov (indexed) [DOE]

    WIPP Update Frank Marcinowski Deputy Assistant Secretary for Waste Management Office of Environmental Management EMSSAB Chairs Meeting, April 23, 2014 - Pasco, WA www.energy.gov/EM 2 Waste Isolation Pilot Plant www.wipp.doe.gov www.energy.gov/EM 3 February 5th Fire: * All operations at the repository ceased following salt haul truck fire in the WIPP underground * An investigation team was deployed to determine the cause of the fire * Report released March 13th February 14th Radiological

  10. Microsoft Word - NR WIPP CONTRACT EXTENSION MAY 3 2010.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Extends Management and Operations Contract at Waste Isolation Pilot Plant Carlsbad, NM. - The U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) today announced a...

  11. WIPP AT WORK | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Carlsbad, NM - Transuranic (TRU) waste cleanup efforts are underway across the DOE complex, as the Waste Isolation Pilot Plant (WIPP) wraps up its 11th year of disposal operations. The Carlsbad Field Office (CBFO) manages the DOE's National TRU Program (NTP) Office and WIPP facility operations. TRU waste temporarily stored at DOE generator sites around the country is shipped to WIPP and disposed in rooms mined out of an ancient salt formation 2,150 feet below the surface. WIPP, which began waste

  12. Waste acceptance criteria for the Waste Isolation Pilot Plant. Revision 4

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    This Revision 4 of the Waste Acceptance Criteria (WAC), WIPP-DOE-069, identifies and consolidates existing criteria and requirements which regulate the safe handling and preparation of Transuranic (TRU) waste packages for transportation to and emplacement in the Waste Isolation Pilot Plant (WIPP). This consolidation does not invalidate any existing certification of TRU waste to the WIPP Operations and Safety Criteria (Revision 3 of WIPP-DOE--069) and/or Transportation: Waste Package Requirements (TRUPACT-II Safety Analysis Report for Packaging [SARP]). Those documents being consolidated, including Revision 3 of the WAC, currently support the Test Phase.

  13. WIPP News & Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlsbad Field Office Information WIPP Overview Click on the Play button for an overview of the Waste Isolation Pilot Plant. (2.5 minutes, FLASH required) If you are not able to view the WIPP Overview, try clicking the graphic above to download the free Flash Player. News Releases Current and archived news releases TRU TeamWorks Read WIPP's online newsletter Fact Sheets Learn about WIPP basics with these educational summaries of popular topics Photo Gallery See photos of the work done at WIPP

  14. Waste Isolation Pilot Plant, National Transuranic Program Have...

    Office of Environmental Management (EM)

    Plant, National Transuranic Program Have Banner Year in 2013 Waste Isolation Pilot Plant, ... WIPP has permanently disposed of more than 89,000 cubic meters of TRU waste enough ...

  15. Compaction behavior of surrogate degraded emplaced WIPP waste.

    SciTech Connect (OSTI)

    Broome, Scott Thomas; Bronowski, David R.; Kuthakun, Souvanny James; Pfeifle, Thomas W.; Herrick, Courtney Grant

    2014-03-01

    The present study results are focused on laboratory testing of surrogate waste materials. The surrogate wastes correspond to a conservative estimate of degraded Waste Isolation Pilot Plant (WIPP) containers and TRU waste materials at the end of the 10,000 year regulatory period. Testing consists of hydrostatic, triaxial, and uniaxial strain tests performed on surrogate waste recipes that were previously developed by Hansen et al. (1997). These recipes can be divided into materials that simulate 50% and 100% degraded waste by weight. The percent degradation indicates the anticipated amount of iron corrosion, as well as the decomposition of cellulosics, plastics, and rubbers (CPR). Axial, lateral, and volumetric strain and axial, lateral, and pore stress measurements were made. Two unique testing techniques were developed during the course of the experimental program. The first involves the use of dilatometry to measure sample volumetric strain under a hydrostatic condition. Bulk moduli of the samples measured using this technique were consistent with those measured using more conventional methods. The second technique involved performing triaxial tests under lateral strain control. By limiting the lateral strain to zero by controlling the applied confining pressure while loading the specimen axially in compression, one can maintain a right-circular cylindrical geometry even under large deformations. This technique is preferred over standard triaxial testing methods which result in inhomogeneous deformation or (3z(Bbarreling(3y. (BManifestations of the inhomogeneous deformation included non-uniform stress states, as well as unrealistic Poissons ratios (> 0.5) or those that vary significantly along the length of the specimen. Zero lateral strain controlled tests yield a more uniform stress state, and admissible and uniform values of Poissons ratio.

  16. WIPP receives 9,000th shipment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP receives 9,000th shipment CARLSBAD, N.M., October 7, 2010 The U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) received its 9,000th shipment of transuranic...

  17. Appendix DATA Attachment A: WIPP Borehole Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Appendix DATA-2014 Attachment A: WIPP Borehole Update Table of Contents DATA-A-1.0 WIPP Boreholes...

  18. WIPP Facility Work Plan for Solid Waste Management Units

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-02-14

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

  19. Microsoft Word - Waste Isolation Pilot Plant Summary Report May 22.2014.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Preliminary Summary Report for Waste Isolation Pilot Plant (WIPP) Samples David Diprete John Young Leigh Brown Analytical Development (AD) Section May 22, 2014 - Revision 0 2 May 22, 2014 Revision 0 SRNL Preliminary Summary Report for Waste Isolation Pilot Plant (WIPP) Samples Background The Savannah River National Laboratory (SRNL), Analytical Development (AD) section received high priority samples from the Waste Isolation Pilot Plant (WIPP) in New Mexico on May 8, 2014. The samples consisted

  20. The WIPP RCRA Part B permit application for TRU mixed waste disposal

    SciTech Connect (OSTI)

    Johnson, J.E. [Westinghouse Electric Corp., Carlsbad, NM (United States). Waste Isolation Div.; Snider, C.A. [USDOE Carlsbad Area Office, NM (United States)

    1995-12-31

    In August 1993, the New Mexico Environment Department (NMED) issued a draft permit for the Waste Isolation Pilot Plant (WIPP) to begin experiments with transuranic (TRU) mixed waste. Subsequently, the Department of Energy (DOE) decided to cancel the on-site test program, opting instead for laboratory testing. The Secretary of the NMED withdrew the draft permit in 1994, ordering the State`s Hazardous and Radioactive Waste Bureau to work with the DOE on submittal of a revised permit application. Revision 5 of the WIPP`s Resource Conservation and Recovery Act (RCRA) Part B Permit Application was submitted to the NMED in May 1995, focusing on disposal of 175,600 m{sup 3} of TRU mixed waste over a 25 year span plus ten years for closure. A key portion of the application, the Waste Analysis Plan, shifted from requirements to characterize a relatively small volume of TRU mixed waste for on-site experiments, to describing a complete program that would apply to all DOE TRU waste generating facilities and meet the appropriate RCRA regulations. Waste characterization will be conducted on a waste stream basis, fitting into three broad categories: (1) homogeneous solids, (2) soil/gravel, and (3) debris wastes. Techniques used include radiography, visually examining waste from opened containers, radioassay, headspace gas sampling, physical sampling and analysis of homogeneous wastes, and review of documented acceptable knowledge. Acceptable knowledge of the original organics and metals used, and the operations that generated these waste streams is sufficient in most cases to determine if the waste has toxicity characteristics, hazardous constituents, polychlorinated biphenyls (PBCs), or RCRA regulated metals.

  1. Hanford Shipment Arrives Safely At Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Shipment Arrives Safely At Waste Isolation Pilot Plant CARLSBAD, N.M., July 14, 2000 - A shipment of defense-generated transuranic radioactive waste from the U.S. Department of Energy's (DOE's) Hanford Site arrived safely today at the Waste Isolation Pilot Plant (WIPP). The shipment left the Richland, Wash. site at about 5 p.m. (Pacific Time) July 12 and arrived at WIPP today at about 2:10 p.m. (MT). Hanford is the fourth DOE site to ship waste to WIPP. Over the next 35-year period,

  2. Appendix DATA Attachment A: WIPP Borehole Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A: WIPP Borehole Update United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Appendix DATA-2014 Attachment A: WIPP Borehole Update Table of Contents DATA-A-1.0 WIPP Boreholes DATA-A-2.0 Individual Well Reports DATA-A-2.1 New Wells Drilled Since the CRA-2009 DATA-A-2.2 Plugged Wells DATA-A-3.0 References List of Tables Table DATA-A- 1. Status of WIPP Boreholes December 2012 WIPP Table DATA-A-1. Status of WIPP Boreholes December 2012 WIPP

  3. WIPP Attracts International Interest

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – EM’s Waste Isolation Pilot Plant (WIPP) was in the spotlight with two international organizations at meetings held in Europe late last year.

  4. WIPP Nitrate Updates 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update, December 4, 2014 Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF Jose R. FrancoCBFO and Robert L. McQuinnNWP dated December 5, 2014 WIPP Nitrate Salt...

  5. Waste Isolation Pilot Plant Recovery Plan

    Broader source: Energy.gov (indexed) [DOE]

    Waste Isolation Pilot Plant Recovery Plan Revision 0 September 30, 2014 [This page left blank.] EXECUTIVE SUMMARY Overview This Recovery Plan provides a safe and compliant approach to resuming operations at the Waste Isolation Pilot Plant (WIPP), the repository for disposal of the nation's defense transuranic (TRU) waste. The U.S. Department of Energy (DOE) is committed to resuming operations by the first quarter of calendar year 2016, and this Recovery Plan outlines the Department's approach to

  6. DOE Announces New WIPP Tour Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Announces New WIPP Tour Schedule CARLSBAD, N.M., March 14, 2001 - The U.S. Department of Energy's (DOE) Carlsbad Field Office today announced changes in the public tour program at the Waste Isolation Pilot Plant (WIPP). Public tours of WIPP's surface and underground are now offered on Tuesdays and Wednesdays. Previously, tours took place throughout the week. The decision to reduce the number of tours is based on safety and waste handling requirements as WIPP approaches full-scale operations.

  7. WIPP Accelerating Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ACCELERATING CLEANUP: PATHS TO CLOSURE CARLSBAD AREA OFFICE JUNE 1998 I. Operations/Field Overview CAO Mission The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant (WIPP) for safe disposal of transuranic (TRU) waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to CAO, WIPP site operations, transportation, and other

  8. WIPP Celebrates 14th Anniversary

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – The Waste Isolation Pilot Plant (WIPP) recently marked its 14th year as America’s only operational deep geologic repository for the disposal of radioactive waste.

  9. WIPP Doubles Solid Waste Reduction Rate in Fiscal Year 2013 | Department of

    Office of Environmental Management (EM)

    Energy Doubles Solid Waste Reduction Rate in Fiscal Year 2013 WIPP Doubles Solid Waste Reduction Rate in Fiscal Year 2013 December 5, 2013 - 12:00pm Addthis WIPP environmental and operations personnel gather next to pallets that will be provided to the local community as part of WIPP’s wood waste diversion program. WIPP environmental and operations personnel gather next to pallets that will be provided to the local community as part of WIPP's wood waste diversion program. CARLSBAD, N.M.

  10. Empty WIPP truck overturns

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Washington TRU Solutions (505) 234-7204 www.wipp.energy.gov U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 DOENews For Immediate Release Empty WIPP truck overturns CARLSBAD, N.M., December 27, 2005 - The U.S. Department of Energy (DOE) Carlsbad Field Office reports that a Waste Isolation Pilot Plant (WIPP) truck carrying three empty TRUPACT-II shipping containers overturned on Interstate 15 near Blackfoot, Idaho, at

  11. GAS-GENERATION EXPERIMENTS FOR LONG-TERM STORAGE OF TRU WASTES AT WIPP

    SciTech Connect (OSTI)

    Felicione, F.S.; Carney, K.P.; Dwight, C.C.; Cummings, D.G.; Foulkrod, L.E.

    2003-02-27

    An experimental investigation was conducted for gas generation in contact-handled transuranic (CH-TRU) wastes subjected for several years to conditions similar to those expected to occur at the Waste Isolation Pilot Plant (WIPP) should the repository eventually become inundated with brine. Various types of actual CH-TRU wastes were placed into 12 corrosion-resistant vessels. The vessels were loosely filled with the wastes, which were submerged in synthetic brine having the same chemical composition as that in the WIPP vicinity. The vessels were also inoculated with microbes found in the Salado Formation at WIPP. The vessels were sealed, purged, and the approximately 750-ml headspace was pressurized with nitrogen gas to approximately 146 atmospheres to create anoxic conditions at the lithostatic pressure expected in the repository were it inundated. The temperature was maintained at the expected 30 C. The test program objective was to measure the quantities and species of gases generate d by metal corrosion, radiolysis, and microbial activity. These data will assist in the specification of the rates at which gases are produced under inundated repository conditions for use in the WIPP Performance Assessment computer models. These experiments were very carefully designed, constructed, instrumented, and performed. Approximately 6-1/2 years of continuous, undisturbed testing were accumulated. Several of the vessels showed significantly elevated levels of generated gases, virtually all of which was hydrogen. One vessel measured over 4.2% hydrogen, by volume. Two other vessels generated well over 1% hydrogen, and another was at nearly 1%. Only small quantities of other gases, principally carbon dioxide, were detected. Gas generation was found to depend strongly on the waste composition. The maximum hydrogen generation occurred in tests containing carbon steel. Average corrosion penetration rates in carbon-steel of up to 2.3 microns per year were deduced. Conversion of carbon to carbon dioxide was calculated to be up to 4.7 {micro}g-mol/yr/g-carbon.

  12. Enterprise Assessments Review, Waste Isolation Pilot Plant - December

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 | Department of Energy December, 2014 Review of the Waste Isolation Pilot Plant Conduct of Maintenance Recovery Plan The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department of Energy's independent Office of Enterprise Assessments, conducted a limited scope review of the current status of Waste Isolation Pilot Plant (WIPP) plans and activities outlined in the WIPP Recovery Plan in the area of Conduct of Maintenance and the associated planned maintenance

  13. Waste Isolation Pilot Plant Site Environmental Report for calendar year 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    This is the 1989 Site Environmental Report (SER) for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP is a government owned and contractor-operated facility. The WIPP project is operated by Westinghouse Electric Corporation for the US Department of Energy (DOE). The mission of the WIPP is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) waste generated by the defense activities of the US Government. This report provides a comprehensive description of environmental activities at the WIPP during calendar year 1989. The WIPP facility will not receive waste until all concerns affecting opening the WIPP are addressed to the satisfaction of the Secretary of Energy. Therefore, this report describes the status of the preoperational activities of the Radiological Environmental Surveillance (RES) program, which are outlined in the Radiological Baseline Program for the Waste Isolation Pilot Plant (WTSD-TME-057). 72 refs., 13 figs., 20 tabs.

  14. WIPP Hazardous Waste Permit - Approved Modifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Solid Waste Management Units and Areas of Concern - August 2007 Final Class 1 WTS Mgr Change 9-05-07 Class 1 Permit Notifications final 9-12-07 Class 2 Monitoring Filled...

  15. Waste Isolation Pilot Plant Update and Status of Recovery | Department of

    Office of Environmental Management (EM)

    Energy Isolation Pilot Plant Update and Status of Recovery Waste Isolation Pilot Plant Update and Status of Recovery Topic: Dana Bryson CBFO, Provided Information on the Status of the WIPP Site Recovery. Information Provided Included the two WIPP Events that Resulted in the Site Operations Shut Down and The Status of the Investigations. PDF icon WIPPP Update - May 21, 2014 More Documents & Publications WIPP Update and Status of Recovery NNMCAB Board Minutes: May 2014 Pojoaque Waste

  16. Waste Isolation Pilot Plant Safety Analysis Report

    SciTech Connect (OSTI)

    1995-11-01

    The following provides a summary of the specific issues addressed in this FY-95 Annual Update as they relate to the CH TRU safety bases: Executive Summary; Site Characteristics; Principal Design and Safety Criteria; Facility Design and Operation; Hazards and Accident Analysis; Derivation of Technical Safety Requirements; Radiological and Hazardous Material Protection; Institutional Programs; Quality Assurance; and Decontamination and Decommissioning. The System Design Descriptions`` (SDDS) for the WIPP were reviewed and incorporated into Chapter 3, Principal Design and Safety Criteria and Chapter 4, Facility Design and Operation. This provides the most currently available final engineering design information on waste emplacement operations throughout the disposal phase up to the point of permanent closure. Also, the criteria which define the TRU waste to be accepted for disposal at the WIPP facility were summarized in Chapter 3 based on the WAC for the Waste Isolation Pilot Plant.`` This Safety Analysis Report (SAR) documents the safety analyses that develop and evaluate the adequacy of the Waste Isolation Pilot Plant Contact-Handled Transuranic Wastes (WIPP CH TRU) safety bases necessary to ensure the safety of workers, the public and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. The analyses of the hazards associated with the long-term (10,000 year) disposal of TRU and TRU mixed waste, and demonstration of compliance with the requirements of 40 CFR 191, Subpart B and 40 CFR 268.6 will be addressed in detail in the WIPP Final Certification Application scheduled for submittal in October 1996 (40 CFR 191) and the No-Migration Variance Petition (40 CFR 268.6) scheduled for submittal in June 1996. Section 5.4, Long-Term Waste Isolation Assessment summarizes the current status of the assessment.

  17. Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report

    SciTech Connect (OSTI)

    Britt, Phillip F

    2015-03-01

    Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report. Summaries of conclusions, analytical processes, and analytical results. Analysis of samples taken from the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico in support of the WIPP Technical Assessment Team (TAT) activities to determine to the extent feasible the mechanisms and chemical reactions that may have resulted in the breach of at least one waste drum and release of waste material in WIPP Panel 7 Room 7 on February 14, 2014. This report integrates and summarizes the results contained in three separate reports, described below, and draws conclusions based on those results. Chemical and Radiochemical Analyses of WIPP Samples R-15 C5 SWB and R16 C-4 Lip; PNNL-24003, Pacific Northwest National Laboratory, December 2014 Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL); SRNL-STI-2014-00617; Savannah River National Laboratory, December 2014 Report for WIPP UG Sample #3, R15C5 (9/3/14); LLNL-TR-667015; Lawrence Livermore National Laboratory, January 2015 This report is also contained in the Waste Isolation Pilot Plant Technical Assessment Team Report; SRNL-RP-2015-01198; Savannah River National Laboratory, March 17, 2015, as Appendix C: Analysis Integrated Summary Report.

  18. WIPP Transportation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transuranic Waste Transportation Container Documents Documents related to transuranic waste containers and packages. CBFO Tribal Program Information about WIPP shipments across tribal lands. Transportation Centralized Procurement Program - The Centralized Procurement Program provides a common method to procure standard items used in the packaging and handling of transuranic wasted destined for WIPP. Transuranic Waste Transportation Routes - A map showing transuranic waste generator sites and

  19. DOE Awards WIPP Independent Oversight Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Anne Wickham (513) 246-0463) Dennis Hurtt (505) 234-7327 http://www.wipp.ws U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 DOENews For Immediate Release DOE Awards WIPP Independent Oversight Contract Cincinnati, Ohio, October 7, 2005 - Today the U.S. Department of Energy (DOE) announced the award of the Waste Isolation Pilot Plant (WIPP) Independent Oversight contract to Pecos Management Services, Incorporated (Pecos) of

  20. DOE/WIPP-13-3507

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE/WIPP-13-3507 2 This page intentionally left blank Waste Isolation Pilot Plant Annual Site Environmental Report for 2012 DOE/WIPP-13-3507 3 2012 Annual Site Environmental Report To our readers: This Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2012 presents summary environmental data to (1) characterize site environmental management performance; (2) summarize environmental occurrences and responses reported during the calendar year; (3) confirm compliance with

  1. WIPP Workers Perform Filter Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 10, 2015 WIPP Workers Perform Filter Replacement As recovery operations at the Waste Isolation Pilot Plant continue, increased work activity in the underground results in higher levels of airborne salt dust, increasing the frequency with which filters are replaced. Last week, workers performed a filter replacement on WIPP's Underground Ventilation System. WIPP's ventilation system has two filter units. Each unit has 84 separate filters arranges in four layers- moderate efficiency

  2. Hanford Tank Waste to WIPP - Maximizing the Value of our National Repository Asset

    SciTech Connect (OSTI)

    Tedeschi, Allan R.; Wheeler, Martin

    2013-11-11

    Preplanning scope for the Hanford tank transuranic (TRU) waste project was authorized in 2013 by the Department of Energy (DOE) Office of River Protection (ORP) after a project standby period of eight years. Significant changes in DOE orders, Hanford contracts, and requirements at the Waste Isolation Pilot Plant (WIPP) have occurred during this time period, in addition to newly implemented regulatory permitting, re-evaluated waste management strategies, and new commercial applications. Preplanning has identified the following key approaches for reactivating the project: qualification of tank inventory designations and completion of all environmental regulatory permitting; identifying program options to accelerate retrieval of key leaking tank T-111; planning fully compliant implementation of DOE Order 413.3B, and DOE Standard 1189 for potential on-site treatment; and re-evaluation of commercial retrieval and treatment technologies for better strategic bundling of permanent waste disposal options.

  3. Science @WIPP: Underground Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at WIPP. Infrastructure Click to view image Waste hoist at WIPP is state of the art - 45 ton capacity No interference from radioactive waste at WIPP Click to view image...

  4. Waste Isolation Pilot Plant Recovery Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Isolation Pilot Plant Recovery Plan Waste Isolation Pilot Plant Recovery Plan This Recovery Plan provides a safe and compliant approach to resuming operations at the Waste Isolation Pilot Plant (WIPP), the repository for disposal of the nation's defense transuranic (TRU) waste. The U.S. Department of Energy (DOE) is committed to resuming operations by the first quarter of calendar year 2016, and this Recovery Plan outlines the Department's approach to meet that schedule while prioritizing

  5. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Havens Increases WIPP Underground Safety November 12, 2015 - WIPP Conducts Limited Scope Performance Tests October Updates October 22, 2015 - WIPP Interim Ventilation System...

  6. WIPP Receives 200th Shipment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    200 th Shipment CARLSBAD, N.M., April 18, 2001 - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) today received its 200 th shipment of defense- generated...

  7. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern.

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2000-05-23

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  8. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 3, Chapter C, Appendix C3 (conclusion)--Chapter C, Appendix C9: Revision 3

    SciTech Connect (OSTI)

    Roggenthen, D. K.; McFeeters, T. L.; Nieweg, R. G.; Blakeslee, J. J.

    1993-03-01

    This volume contains appendices for the following: results of extraction procedure (EP) toxicity data analyses; summary of headspace gas analysis in Rocky Flats Plant sampling program-FY 1988; waste drum gas generation sampling program at Rocky Flats Plant during FY 1988; TRU waste sampling program waste characterization; summary of headspace gas analyses in TRU waste sampling program; summary of volatile organic compounds analyses in TRU waste sampling program; totals analysis versus toxicity characteristic leaching procedure; Waste Isolation Pilot Plant waste characterization sampling and analysis methods; Waste Isolation Pilot Plant waste characterization analytical methods; data reduction, validation and reporting; examples of waste screening checklists; and Waste Isolation Pilot Plant generator/storage site waste screening and acceptance audit program.

  9. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-3542 Site Sustainability Plan Waste Isolation Pilot Plant Fiscal Year 2015 Narrative ... Manager, Carlsbad Field Office Site Sustainability Plan Waste Isolation Pilot Plant, ...

  10. WIPP Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Large file size alert This symbol means the document may be a large file size. Environmental Monitoring Documents about environmental monitoring at WIPP, including annual site environmental reports Environmental Protection Agency Certification Documents about WIPP's EPA certification Federal Regulations Standards and compliance criteria for WIPP Hazardous Waste Facility Permit Documents related to the state of New Mexico's oversight of WIPP under the authority of the Resource Conservation and

  11. DOE Issues WIPP Radiological Release Phase II Investigation Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    radiological event at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. ... second from left, receives the New Mexico Patriotic Employer Award from the N.M. ...

  12. DISPOSAL OF TRU WASTE FROM THE PLUTONIUM FINISHING PLANT IN PIPE OVERPACK CONTAINERS TO WIPP INCLUDING NEW SECURITY REQUIREMENTS

    SciTech Connect (OSTI)

    Hopkins, A.M.; Sutter, C.; Hulse, G.; Teal, J.

    2003-02-27

    The Department of Energy is responsible for the safe management and cleanup of the DOE complex. As part of the cleanup and closure of the Plutonium Finishing Plant (PFP) located on the Hanford site, the nuclear material inventory was reviewed to determine the appropriate disposition path. Based on the nuclear material characteristics, the material was designated for stabilization and packaging for long term storage and transfer to the Savannah River Site or, a decision for discard was made. The discarded material was designated as waste material and slated for disposal to the Waste Isolation Pilot Plant (WIPP). Prior to preparing any residue wastes for disposal at the WIPP, several major activities need to be completed. As detailed a processing history as possible of the material including origin of the waste must be researched and documented. A technical basis for termination of safeguards on the material must be prepared and approved. Utilizing process knowledge and processing history, the material must be characterized, sampling requirements determined, acceptable knowledge package and waste designation completed prior to disposal. All of these activities involve several organizations including the contractor, DOE, state representatives and other regulators such as EPA. At PFP, a process has been developed for meeting the many, varied requirements and successfully used to prepare several residue waste streams including Rocky Flats incinerator ash, Hanford incinerator ash and Sand, Slag and Crucible (SS&C) material for disposal. These waste residues are packed into Pipe Overpack Containers for shipment to the WIPP.

  13. Microsoft Word - WIPP-023 WIPP FHA rev 5a 01-22-12

    Office of Environmental Management (EM)

    WIPP-023, REV. 5A FIRE HAZARD ANALYSIS FOR THE WASTE ISOLATION PILOT PLANT Date Issued - January 2013 Prepared for the U.S. Department of Energy Waste Isolation Pilot Plant Nuclear Waste Partnership LLC Managing the Waste Isolation Pilot Plant Carlsbad, NM Under Contract DE-EM001971 for the U.S. Department of Energy Fire Hazard Analysis for the Waste Isolation Pilot Plant WIPP-023, Rev. 5A iii Revision Log Revision Number Date Description of Changes Pages Affected DOE/WIPP 3217, Rev. 0

  14. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Notification of Last Waste Emplacement and Intent to Commence Closure of the Waste Isolation Pilot Plant Hazardous Waste Disposal Unit Panel 5 dated March 30, 2011 Submittal of Final Audit Reports Transmittal of the Final Audit Report A-11-20, Argonne National Laboratory Central Characterization Project for Remote-Handled Waste Characterization dated October 26, 2011 Transmittal of the Recertification

  15. Review of the WIPP draft application to show compliance with EPA transuranic waste disposal standards

    SciTech Connect (OSTI)

    Neill, R.H.; Chaturvedi, L.; Clemo, T.M.

    1996-03-01

    The purpose of the New Mexico Environmental Evaluation Group (EEG) is to conduct an independent technical evaluation of the Waste Isolation Pilot Plant (WIPP) Project to ensure the protection of the public health and safety and the environment. The WIPP Project, located in southeastern New Mexico, is being constructed as a repository for the disposal of transuranic (TRU) radioactive wastes generated by the national defense programs. The EEG was established in 1978 with funds provided by the U.S. Department of Energy (DOE) to the State of New Mexico. Public Law 100-456, the National Defense Authorization Act, Fiscal Year 1989, Section 1433, assigned EEG to the New Mexico Institute of Mining and Technology and continued the original contract DE-AC04-79AL10752 through DOE contract DE-AC04-89AL58309. The National Defense Authorization Act for Fiscal Year 1994, Public Law 103-160, continues the authorization. EEG performs independent technical analyses of the suitability of the proposed site; the design of the repository, its planned operation, and its long-term integrity; suitability and safety of the transportation systems; suitability of the Waste Acceptance Criteria and the generator sites` compliance with them; and related subjects. These analyses include assessments of reports issued by the DOE and its contractors, other federal agencies and organizations, as they relate to the potential health, safety and environmental impacts from WIPP. Another important function of EEG is the independent environmental monitoring of background radioactivity in air, water, and soil, both on-site and off-site.

  16. Recovery Progress Has WIPP Poised to

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    e New underground fire-fighting equipment has been purchased over the past two years. Recovery Progress Has WIPP Poised to Resume Operations in 2016 The Department of Energy's (DOE) Carlsbad Field Office (CBFO) and Nuclear Waste Partnership (NWP), the management and operations contractor for the Waste Isolation Pilot Plant (WIPP) have made significant progress in recovery efforts at WIPP following the 2014 salt haul truck fire and radiological release. This progress has the Nation's only

  17. Microsoft Word - DOE Approves WIPP Workforce Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Approves WIPP Workforce Plan All Current Employees Will Be Needed During Recovery Efforts CARLSBAD, N.M., March 10, 2014 - On March 10 Nuclear Waste Partnership (NWP) submitted a plan to the Energy Department to fully utilize the Waste Isolation Pilot Plant (WIPP) workforce to lead recovery activities from two recent incidents. The Department has agreed with the approach outlined by NWP for the utilization of their workforce at WIPP. Under this plan, all workers currently

  18. Department of Energy Releases WIPP Recovery Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Releases WIPP Recovery Plan Washington, D.C. - Today, the Department of Energy (DOE) released the Waste Isolation Pilot Plant (WIPP) Recovery Plan, outlining the necessary steps to resume operations at the transuranic waste disposal site outside of Carlsbad, N.M. WIPP operations were suspended following an underground truck fire and a radiological release earlier this year. "Safety is our top priority," said Mark Whitney, Acting Assistant Secretary for DOE's Office

  19. WIPP - Carlsbad Field Office Tribal Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlsbad Field Office Tribal Program Shipments to the Waste Isolation Pilot Plant (WIPP) travel through 10 Native American Reservations (among six states) along the transportation routes. The U.S. Department of Energy's (DOE) Carlsbad Field Office's (CBFO) Tribal Program enhances the safe transportation of transuranic waste shipments to WIPP across tribal lands, while strengthening tribes' capabilities where they have jurisdiction. A WIPP truck with three TRUPACT-II shipping containers on back

  20. WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thousand Nuclear Waste Containers Safely Disposed at WIPP April 8 WIPP Mine Rescue Teams Excel at Regional Competition February 18 Security Walls-Triumph Technologies Team Awarded...

  1. Performance Assessment Updates for Waste Isolation Pilot Plant

    Office of Environmental Management (EM)

    Recertification | Department of Energy Updates for Waste Isolation Pilot Plant Recertification Performance Assessment Updates for Waste Isolation Pilot Plant Recertification R. Chris Camphouse Sandia National Laboratories December 12, 2014 To view all the P&RA CoP 2014 Technical Exchange Meeting videos click here. Video Presentation PDF icon Performance Assessment Updates for Waste Isolation Pilot Plant Recertification More Documents & Publications WIPP Performance Assessment:

  2. DOE Waste Isolation Pilot Plant Receives EPA Recertification | Department

    Energy Savers [EERE]

    of Energy Waste Isolation Pilot Plant Receives EPA Recertification DOE Waste Isolation Pilot Plant Receives EPA Recertification March 29, 2006 - 9:42am Addthis CARLSBAD, NM - The U.S. Department of Energy's (DOE) Carlsbad Field Office today reached a significant milestone when its Waste Isolation Pilot Plant (WIPP) was recertified by the U.S. Environmental Protection Agency (EPA). This decision indicates that after a thorough evaluation of the physical state and performance of the facility,

  3. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Isolation Pilot Plant AFFIDAVIT FOR SURVIVING RELATIVE STATE ) ) ss: COUNTY OF ) That I, , am the...

  4. Evaluation of the WIPP Project`s compliance with the EPA radiation protection standards for disposal of transuranic waste

    SciTech Connect (OSTI)

    Neill, R.H.; Chaturvedi, L.; Rucker, D.F.; Silva, M.K.; Walker, B.A.; Channell, J.K.; Clemo, T.M.

    1998-03-01

    The US Environmental Protection Agency`s (EPA) proposed rule to certify that the Waste Isolation Pilot Plant (WIPP) meets compliance with the long-term radiation protection standards for geologic repositories (40CFR191 Subparts B and C), is one of the most significant milestones to date for the WIPP project in particular, and for the nuclear waste issue in general. The Environmental Evaluation Group (EEG) has provided an independent technical oversight for the WIPP project since 1978, and is responsible for many improvements in the location, design, and testing of various aspects of the project, including participation in the development of the EPA standards since the early 1980s. The EEG reviewed the development of documentation for assessing the WIPP`s compliance by the Sandia National Laboratories following the 1985 promulgation by EPA, and provided many written and verbal comments on various aspects of this effort, culminating in the overall review of the 1992 performance assessment. For the US Department of Energy`s (DOE) compliance certification application (CCA), the EEG provided detailed comments on the draft CCA in March, 1996, and additional comments through unpublished letters in 1997 (included as Appendices 8.1 and 8.2 in this report). Since the October 30, 1997, publication of the EPA`s proposed rule to certify WIPP, the EEG gave presentations on important issues to the EPA on December 10, 1997, and sent a December 31, 1997 letter with attachments to clarify those issues (Appendix 8.3). The EEG has raised a number of questions that may have an impact on compliance. In spite of the best efforts by the EEG, the EPA reaction to reviews and suggestions has been slow and apparently driven by legal considerations. This report discusses in detail the questions that have been raised about containment requirements. Also discussed are assurance requirements, groundwater protection, individual protection, and an evaluation of EPA`s responses to EEG`s comments.

  5. Step-By-Step Guide for Waste Handling at WIPP - Fact Sheet

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is an overview of those steps. A waste shipment arrives at the WIPP by tractor-trailer. Each tractor-trailer is capable of carrying up to three Transuranic Packaging...

  6. New Facility Aids in Lab's Capability to Ship TRU Waste to WIPP |

    Office of Environmental Management (EM)

    Department of Energy Facility Aids in Lab's Capability to Ship TRU Waste to WIPP New Facility Aids in Lab's Capability to Ship TRU Waste to WIPP December 1, 2011 - 12:00pm Addthis Workers move standard waste boxes to the High-Energy Real Time Radiography facility. Workers move standard waste boxes to the High-Energy Real Time Radiography facility. A standard waste box enters the HE-RTR at Los Alamos National Laboratory. The facility x-rays waste drums that contain high-density items such as

  7. Waste Isolation Pilot Plant Technical Assessment Team Report Revision 0 |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (SNL). The charter of the WIPP Technical Assessment Team (TAT) was to determine to the extent

  8. WIPP Receives First Remote-Handled Waste Shipment From Sandia Labs |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy has received the first of eight planned defense-related remote-handled transuranic (RH-TRU) waste shipments from Sandia National Laboratories (SNL) in Albuquerque. The shipment arrived December 16 for permanent disposal in WIPP's underground repository. DOE National TRU Program Director J.R. Stroble said the shipment is significant to WIPP. "Our goal is to reduce the nation's nuclear waste footprint and we routinely receive shipments from around the country,"

  9. WIPP RH-TRU Waste Study - Notice To Users

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the United States of America. Use of NTP WWW server is intended only for the retrieval of information available through NTP WWW documents. Only authorized WIPP...

  10. Resource Conservation and Recovery Act, Part B permit application [of the Waste Isolation Pilot Plant (WIPP)]. Volume 11, Chapter D, Appendix D4--Chapter D, Appendix D17: Revision 3

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This volume contains appendices D4 through D17 which cover the following: Waste Isolation Pilot Plant site environmental report; ecological monitoring program at the Waste Isolation Pilot Plant; site characterization; regional and site geology and hydrology; general geology; dissolution features; ground water hydrology; typical carbon sorption bed efficiency; VOC monitoring plan for bin-room tests; chemical compatibility analysis of waste forms and container materials; probable maximum precipitation; WHIP supplementary roof support system room 1, panel 1; and corrosion risk assessment of the Waste Isolation Pilot Plant ``humid`` test bins.

  11. WIPP - Fact Sheets

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fact Sheets General | Transportation | Disposal General Why WIPP? The Remote-Handled Transuranic Waste Program Radiation What is Plutonium? How Will Future Generations Be Warned? Joint Information Center (JIC) Carlsbad Field Office and its Mission Waste to be Consolidated at Idaho Site Before Shipment to WIPP WIPP Chronology The Waste Data System Salt Defense Disposal Investigations Brochure Transportation Back to top WIPP Transportation System WIPP Waste Shipments Tracked By Satellite Emergency

  12. Waste Isolation Pilot Plant 2005 Site Environmental Report

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services

    2006-10-13

    The purpose of this report is to provide information needed by the DOE to assess WIPP's environmental performance and to make WIPP environmental information available to stakeholders and members of the public. This report has been prepared in accordance with DOE Order 231.1A and DOE guidance. This report documents WIPP's environmental monitoring programs and their results for 2004. The WIPP Project is authorized by the DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Pub. L. 96-164). After more than 20 years of scientific study and public input, WIPP received its first shipment of waste on March 26, 1999. Located in southeastern New Mexico, WIPP is the nation's first underground repository permitted to safely and permanently dispose of TRU radioactive and mixed waste (as defined in the WIPP LWA) generated through defense activities and programs. TRU waste is defined, in the WIPP LWA, as radioactive waste containing more than 100 nanocuries (3,700 becquerels [Bq]) of alpha-emitting TRU isotopes per gram of waste, with half-lives greater than 20 years except for high-level waste, waste that has been determined not to require the degree of isolation required by the disposal regulations, and waste the U.S. Nuclear Regulatory Commission (NRC) has approved for disposal. Most TRU waste is contaminated industrial trash, such as rags and old tools; sludges from solidified liquids; glass; metal; and other materials from dismantled buildings. TRU waste is eligible for disposal at WIPP if it has been generated in whole or in part by one or more of the activities listed in the Nuclear Waste Policy Act of 1982 (42 United States Code [U.S.C.] 10101, et seq.), including naval reactors development, weapons activities, verification and control technology, defense nuclear materials production, defense nuclear waste and materials by-products management,defense nuclear materials security and safeguards and security investigations, and defense research and development. The waste must also meet the WIPP Waste Acceptance Criteria. When TRU waste arrives at WIPP, it is transported into the Waste Handling Building. The waste containers are removed from the shipping containers, placed on the waste hoist, and lowered to the repository level of 655 m (2,150 ft; approximately 0.5 mi) below the surface. Next, the containers of waste are removed from the hoist and placed in excavated disposal rooms in the Salado Formation, a thick sequence of evaporite beds deposited approximately 250 million years ago (Figure 1.1). After each panel of seven rooms has been filled with waste, specially designed closures are emplaced. When all of WIPP's panels have been filled, at the conclusion of WIPP operations, seals will be placed in the shafts. One of the main attributes of salt, as a rock formation in which to isolate radioactive waste, is the ability of the salt to creep, that is, to deform continuously over time. Excavations into which the waste-filled drums are placed will close eventually, flowing around the drums and sealing them within the formation.

  13. WIPP UPDATE: January 21, 2016

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 21, 2016 Revised Schedule for Resumption of Operations in 2016 Announced The Department of Energy's Carlsbad Field Office (CBFO) approved the new integrated Performance Measurement Baseline (PMB) for the Waste Isolation Pilot Plant (WIPP). The new PMB integrates WIPP recovery activities, baseline operations and capital asset projects into a single plan with a schedule that identifies a path to resumption of waste emplacement operations. The new PMB considers potential risks that could

  14. EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines | Department

    Office of Environmental Management (EM)

    of Energy Waste Isolation Pilot Plant Team's Holiday Spirit Shines EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines December 23, 2013 - 12:00pm Addthis Aspen Cass, a relative of an EM Carlsbad Field Office (CBFO) employee, holds donated coats with Farok Sharif (left), president and project manager of Nuclear Waste Partnership, the WIPP management and operating contractor, and Joe Franco, manager of CBFO. Aspen Cass, a relative of an EM Carlsbad Field Office (CBFO) employee, holds

  15. Final environmental impact statement. Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Not Available

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)

  16. ISSUED DOE/WIPP-09-3427 Waste Data System User's Manual U.S. Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ISSUED DOE/WIPP-09-3427 Waste Data System User's Manual U.S. Department of Energy Revision 11 July 2015 This document supersedes DOE/WIPP-09-3427, Rev.10. 1 ISSUED DOE/WIPP-09-3427 Waste Data System User's Manual Revision 11 CBFO Approval: Signature on File 07/21/15 J. R. Stroble, Director Date TRU Waste Sites and Transportation Division 2 ISSUED Waste Data System User's Manual DOE/WIPP-09-3427, Rev. 11 TABLE OF CONTENTS CHANGE HISTORY SUMMARY

  17. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services

    2005-07-01

    The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR 264.90 through 264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] 6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

  18. Final environmental impact statement. Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Not Available

    1980-10-01

    In accordance with the National Environmental Policy Act (NEPA) of 1969, the US Department of Energy (DOE) has prepared this document as environmental input to future decisions regarding the Waste Isolation Pilot Plant (WIPP), which would include the disposal of transuranic waste, as currently authorized. The alternatives covered in this document are the following: (1) Continue storing transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) as it is now or with improved confinement. (2) Proceed with WIPP at the Los Medanos site in southeastern New Mexico, as currently authorized. (3) Dispose of TRU waste in the first available repository for high-level waste. The Los Medanos site would be investigated for its potential suitability as a candidate site. This is administration policy and is the alternative preferred by the DOE. (4) Delay the WIPP to allow other candidate sites to be evaluated for TRU-waste disposal. This environmental impact statement is arranged in the following manner: Chapter 1 is an overall summary of the analysis contained in the document. Chapters 2 and 4 set forth the objectives of the national waste-management program and analyze the full spectrum of reasonable alternatives for meeting these objectives, including the WIPP. Chapter 5 presents the interim waste-acceptance criteria and waste-form alternatives for the WIPP. Chapters 6 through 13 provide a detailed description and environmental analysis of the WIPP repository and its site. Chapter 14 describes the permits and approvals necessary for the WIPP and the interactions that have taken place with Federal, State, and local authorities, and with the general public in connection with the repository. Chapter 15 analyzes the many comments received on the DEIS and tells what has been done in this FEIS in response. The appendices contain data and discussions in support of the material in the text.

  19. WIPP Completes State of the Art Emergency Operations Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Participants use the new EOC during a recent emergency response drill. The new state-of-the-art EOC improves WIPP's emergency management capabilities. WIPP UPDATE: October 15, 2015 WIPP Completes State of the Art Emergency Operations Center The Waste Isolation Pilot Plant (WIPP) continues to make improvements to the facility's overall emergency response capabilities. Construction was recently completed on a 4,000 square foot, state of the art Emergency Operations Center (EOC). The Skeen-Whitlock

  20. Microsoft Word - WIPP Update 10_17_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CBFO Manager Joe Franco, left, points to a location on a map of the WIPP underground as EM Acting Assistant Secretary Mark Whitney looks on. WIPP UPDATE: October 17, 2014 Head of EM Visits Waste Isolation Pilot Plant for First Underground Tour Since February Incidents Acting Assistant Secretary for Environmental Management Mark Whitney visited WIPP on Thursday and became the first non-WIPP employee to tour the underground facility since a truck fire and unrelated radiological release temporarily

  1. Microsoft Word - WIPP Update 11_12_15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Emergency Operations Center participate in a drill, simulating an emergency occurrence at the WIPP Facility. WIPP UPDATE: November 12, 2015 WIPP Conducts Limited Scope Performance Tests On November 3-4, the Waste Isolation Pilot Plant (WIPP) Emergency Operations Center staff conducted a series of Limited Scope Performance Tests (LSPT) designed to evaluate the readiness of the Emergency Response Organization (ERO) and the Emergency Operations Center. A series of four exercises were conducted

  2. Microsoft Word - WIPP Update 9_17_15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 17, 2015 WIPP Conducts Annual Full Scale Emergency Response Exercise On September 16, the Waste Isolation Pilot Plant (WIPP) held its annual full-scale exercise to demonstrate and evaluate their overall capability to recognize, respond, contain and mitigate an emergency situation that might occur at WIPP. Exercise participants at the WIPP site were evaluated on their ability to follow and implement plans and procedures, as well as their overall response to the simulated events.

  3. Microsoft Word - 2014 2 26 WIPP Employees Notified of Preliminary Sample Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4DR0214 / 001NWPR0214 NWP Media Contacts: Donavan Mager Nuclear Waste Partnership LLC (575) 234-7586 www.wipp.energy.gov For Immediate Release WIPP Employees Notified of Preliminary Sample Results CARLSBAD, N.M., February 26, 2014 - Today, the Department of Energy's Waste Isolation Pilot Plant (WIPP) and Nuclear Waste Partnership LLC, (NWP) the WIPP contractor, notified 13 employees of positive preliminary bioassay results. The results are based on samples taken as a precautionary measure from

  4. U.S. Department of Energy Carlsbad Field Office Waste Isolation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Carlsbad Field Office (575) 234-7270 www.wipp.energy.gov For Immediate Release Waste Isolation Pilot Plant Receives Second EPA Recertification CARLSBAD, N.M., November...

  5. DOE Seeks Proposals for Management of New Mexico Waste Isolation Pilot Plant

    Broader source: Energy.gov [DOE]

    Cincinnati --The U.S. Department of Energy (DOE) today issued a Final Request for Proposal for management and operations of the Waste Isolation Pilot Plan (WIPP) located in Carlsbad, New Mexico.

  6. Sampling Report for May-June, 2014 Waste Isolation Pilot Plant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pilot Plant Samples Chemical and Radiochemical Analyses of Waste Isolation Pilot Plant (WIPP) Samples R-15 C-5 SWB and R-16 C-4 Lip Sampling Report for Parent Drum S855793...

  7. CBFO selects Senior WIPP Recovery Manager

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2014 CBFO selects Senior WIPP Recovery Manager Sean Dunagan, Research and Development Manager with Sandia National Laboratories, has been appointed as the Carlsbad Field Office (CBFO) Senior WIPP Recovery Manager, effective Dec. 8, 2014. He replaces Tom Teynor, who returned to Hanford to be the Federal Project Manager of the Plutonium Finishing Plant project. Directly leading and representing the Waste Isolation Pilot Plant (WIPP) Recovery Project, Mr. Dunagan will report to CBFO Manager Joe

  8. Waste Isolation Pilot Plant 2003 Site Environmental Report

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services

    2005-09-03

    The purpose of this report is to provide information needed by the DOE to assess WIPP's environmental performance and to convey that performance to stakeholders and members of the public. This report has been prepared in accordance with DOE Order 231.1A and DOE guidance. This report documents WIPP's environmental monitoring programs and their results for 2003. The WIPP Project is authorized by the DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Pub. L. 96-164). After more than 20 years of scientific study and public input, WIPP received its first shipment of waste on March 26, 1999. Located in southeastern New Mexico, WIPP is the nation's first underground repository permitted to safely and permanently dispose of TRU radioactive and mixed waste (as defined in the WIPP LWA) generated through the research and production of nuclear weapons and other activities related to the national defense of the United States. TRU waste is defined in the WIPP LWA as radioactive waste containing more than 100 nanocuries (3,700 becquerels [Bq]) of alpha-emitting transuranic isotopes per gram of waste, with half-lives greater than 20 years. Exceptions are noted as high-level waste, waste that has been determined not to require the degree of isolation required by the disposal regulations, and waste the U.S. Nuclear Regulatory Commission (NRC) has approved for disposal. Most TRU waste is contaminated industrial trash, such as rags and old tools, and sludges from solidified liquids; glass; metal; and other materials from dismantled buildings. A TRU waste is eligible for disposal at WIPP if it has been generated in whole or in partby one or more of the activities listed in the Nuclear Waste Policy Act of 1982 (42 United States Code [U.S.C.] 10101, et seq.), including naval reactors development, weapons activities, verification and control technology, defense nuclear materials production, defense nuclear waste and materials by-products management, defense nuclear materials security and safeguards and security investigations, and defense research and development. The waste must also meet the WIPP Waste Acceptance Criteria. When TRU waste arrives at WIPP, it is transported into the Waste Handling Building. The waste containers are removed from the shipping containers, placed on the waste hoist, and lowered to the repository level of 655 m (2,150 ft; approximately 0.5 mi) below the surface. Next, the containers of waste are removed from the hoist and placed in excavated storage rooms in the Salado Formation, a thick sequence of evaporite beds deposited approximately 250 million years ago (Figure 1.1). After each panel has been filled with waste, specially designed closures are emplaced. When all of WIPP's panels have been filled, at the conclusion of WIPP operations, seals will be placed in the shafts. Salt under pressure is relatively plastic, and mine openings will be allowed to creep closed for final disposal, encapsulating and isolating the waste.

  9. Microsoft Word - WIPP Updates_Underground Recovery Process Begins

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5DR0314 / 002NWPR0314 NWP Media Contacts: Donavan Mager Nuclear Waste Partnership LLC (575) 234-7586 www.wipp.energy.gov For Immediate Release WIPP UPDATES: Underground Recovery Process Begins Initial Results Show no Airborne Radioactive Contamination in Underground Shafts CARLSBAD, N.M., March 9 - Nuclear Waste Partnership (NWP), the management and operations contractor at the Waste Isolation Pilot Plant (WIPP) for the U.S. Department of Energy (DOE), has initiated the first phase of an

  10. WIPP RCRA Documents menu

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RCRA Documents Menu Permit Modifications Available for Public Comment Final Documents Draft Documents None currently available RCRA-Related Documents EEG Preliminary Comments on the Fundamental Bases of the Characterization Requirements for Disposal of Transuranic Waste at the Waste Isolation Pilot Plant and Findings and Recommendations of the Transuranic Waste Characterization Task Force Final Report EEG Response to NAS WIPP Committee Questions for May 19, 2003 Meeting Quality Assurance Program

  11. Microsoft Word - PNNL 24125 Probative Investigation of the Thermal Stability of Wastes Involved in February 2014 WIPP Waste Dru

    Office of Environmental Management (EM)

    PNNL-24125 Limited Distribution Probative Investigation of the Thermal Stability of Wastes Involved in February 2014 WIPP Waste Drum Breach Event March 2015 RD Scheele JM Schwantes BK McNamara MJ Minette DT Hobbs (SRNL) CA Barrett PNNL-24125 Limited Distribution Probative Investigation of the Thermal Stability of Wastes Involved in February 2014 WIPP Waste Drum Breach Event RD Scheele JM Schwantes BK McNamara MJ Minette DT Hobbs (SRNL) CA Barrett March 2015 Prepared for the U.S. Department of

  12. Cookoff Modeling of a WIPP waste drum (68660)

    SciTech Connect (OSTI)

    Hobbs, Michael L.

    2014-11-24

    A waste drum located 2150 feet underground may have been the root cause of a radiation leak on February 14, 2014. Information provided to the WIPP Technical Assessment Team (TAT) was used to describe the approximate content of the drum, which included an organic cat litter (Swheat Scoop®, or Swheat) composed of 100% wheat products. The drum also contained various nitrate salts, oxalic acid, and a nitric acid solution that was neutralized with triethanolamine (TEA). CTH-TIGER was used with the approximate drum contents to specify the products for an exothermic reaction for the drum. If an inorganic adsorbent such as zeolite had been used in lieu of the kitty litter, the overall reaction would have been endothermic. Dilution with a zeolite adsorbent might be a useful method to remediate drums containing organic kitty litter. SIERRA THERMAL was used to calculate the pressurization and ignition of the drum. A baseline simulation of drum 68660 was performed by assuming a background heat source of 0.5-10 W of unknown origin. The 0.5 W source could be representative of heat generated by radioactive decay. The drum ignited after about 70 days. Gas generation at ignition was predicted to be 300-500 psig with a sealed drum (no vent). At ignition, the wall temperature increases modestly by about 1°C, demonstrating that heating would not be apparent prior to ignition. The ignition location was predicted to be about 0.43 meters above the bottom center portion of the drum. At ignition only 3-5 kg (out of 71.6 kg total) has been converted into gas, indicating that most of the material remained available for post-ignition reaction.

  13. DOE Finalizes WIPP Fire Investigation Report

    Broader source: Energy.gov [DOE]

    Washington, DC – Today, the Office of Environmental Management (EM) released the accident investigation report for the underground mine fire involving a salt haul truck at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico.

  14. DOE Issues WIPP Radiological Release Investigation Report

    Broader source: Energy.gov [DOE]

    Today, the Department of Energy’s Office of Environmental Management (EM) released the initial accident investigation report related to the Feb. 14 radiological release at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico.

  15. WIPP Takes Second in Mine Rescue Competition

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – EM’s Waste Isolation Pilot Plant (WIPP) mine rescue team placed second in the Southwestern Regional Mine Rescue Competition this past spring in Carlsbad, and it took home more than a trophy.

  16. WIPP Interim Ventilation System Continues to Progress

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    being installed at the Waste Isolation Pilot Plant (WIPP) continues to move forward. Concrete pads were poured and both the power distribution center and the two-fanfilter units...

  17. Westinghouse TRU Solutions LLC Assumes WIPP Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Isolation Pilot Plant (WIPP). Heading up the new management team is Henry F. "Hank" Herrera, President and General Manager of WTS. A retired U.S. Navy Rear Admiral, Herrera...

  18. False Radiological Alarm in WIPP Underground

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    At approximately 7:40 a.m. Mountain Time today, a portable continuous air monitor (CAM) alarm activated in the Waste Isolation Pilot Plant (WIPP) underground. Shortly after...

  19. WIPP Receives Top Mine Safety Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Top Mine Safety Award CARLSBAD, N.M., September 18, 2013 - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) received top safety honors from the New Mexico...

  20. Waste Isolation Pilot Plant 1999 Site Environmental Report

    SciTech Connect (OSTI)

    Roy B. Evans, Ph.D. Amy Adams Luft Don Martin; Randall C. Morris, Ph.D.; Timothy D. Reynolds, Ph.D.; Ronald W. Warren; Westinghouse Waste Isolation Division

    2000-09-30

    The U.S. Department of Energy?s (DOE)Carlsbad Area Office and the Westinghouse Waste Isolation Division (WID) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 1999 Site Environmental Report summarizes environmental data from calendar year 1999 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during calendar year 1999. WIPP received its first shipment of waste on March 26, 1999. In 1999, no evidence was found of any adverse effects from WIPP on the surrounding environment. Radionuclide concentrations in the environment surrounding WIPP were not statistically higher in 1999 than in 1998.

  1. Waste Isolation Pilot Plant Salt Decontamination Testing

    SciTech Connect (OSTI)

    Rick Demmer; Stephen Reese

    2014-09-01

    On February 14, 2014, americium and plutonium contamination was released in the Waste Isolation Pilot Plant (WIPP) salt caverns. At the request of WIPPs operations contractor, Idaho National Laboratory (INL) personnel developed several methods of decontaminating WIPP salt, using surrogate contaminants and also americium (241Am). The effectiveness of the methods is evaluated qualitatively, and to the extent possible, quantitatively. One of the requirements of this effort was delivering initial results and recommendations within a few weeks. That requirement, in combination with the limited scope of the project, made in-depth analysis impractical in some instances. Of the methods tested (dry brushing, vacuum cleaning, water washing, strippable coatings, and mechanical grinding), the most practical seems to be water washing. Effectiveness is very high, and it is very easy and rapid to deploy. The amount of wastewater produced (2 L/m2) would be substantial and may not be easy to manage, but the method is the clear winner from a usability perspective. Removable surface contamination levels (smear results) from the strippable coating and water washing coupons found no residual removable contamination. Thus, whatever is left is likely adhered to (or trapped within) the salt. The other option that shows promise is the use of a fixative barrier. Bartlett Nuclear, Inc.s Polymeric Barrier System (PBS) proved the most durable of the coatings tested. The coatings were not tested for contaminant entrapment, only for coating integrity and durability.

  2. Waste Isolation Pilot Plant Attracts World Interest | Department of Energy

    Office of Environmental Management (EM)

    Waste Isolation Pilot Plant Attracts World Interest Waste Isolation Pilot Plant Attracts World Interest June 26, 2013 - 12:00pm Addthis Lights, Camera, Action! In May 2013, an INDIGO FILMS production crew prepares for an interview with EM's Carlsbad Field Office Chief Scientist Roger Nelson. INDIGO FILMS is producing a segment on WIPP for a program that highlights interesting, non-public locations that should air on the Travel Channel this fall. Lights, Camera, Action! In May 2013, an INDIGO

  3. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services

    2004-10-25

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2002, to March 31, 2004. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico.

  4. WIPP News Releases - 2004

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safer Testing Requirements for LANL Sealed Source Wastes April 1 WIPP Marks Five Years of Safe Operation March 30 EPA Approves Remote-Handled Waste Procedures for WIPP March 26 DOE...

  5. WIPP UPDATE: September 19, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19, 2014 No second release at WIPP Recent news reports have incorrectly suggested that there is a second breached drum in the Waste Isolation Pilot Plant (WIPP) underground facility. There is no evidence to suggest a release from a second drum. The site conducted initial surveys that showed no evidence of a radiological release from Panel 6, and we have seen no evidence since then that suggests anything different. Worker safety is the Department's highest priority and workers entering

  6. Radiological Monitoring Continues at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiological Monitoring Continues at WIPP CARLSBAD, N.M., February 19, 2014 - Radiological control personnel continue to collect surface and underground monitoring samples at the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) after an underground air monitor detected airborne radiation around 11:30 p.m. (MT) on February 14. Recent laboratory analyses by Carlsbad Environmental Monitoring and Research Center (CEMRC) found some trace amounts of americium and plutonium from a

  7. New Fact Sheet Highlights Waste Isolation Pilot Plant Recovery Progress

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – In a new fact sheet, DOE’s Carlsbad Field Office (CBFO) chronicles the significant progress in recovery efforts at the Waste Isolation Pilot Plant (WIPP) in the two years since a truck fire and radiological release at the site.

  8. WIPP Safety Is Paramount Top to Bottom, Literally

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – As part of the Waste Isolation Pilot Plant’s (WIPP) preventive maintenance program, four of six head ropes that suspend the waste conveyance were safely replaced recently.

  9. Enhanced Driver Requirements for WIPP Shipments - Fact Sheet

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    . a critical step toward solving the nation's nuclear waste disposal problem Enhanced Driver Requirements for WIPP Shipments Waste Isolation Pilot Plant (WIPP), Driver Hiring Qualifications and Requirements WIPP drivers must meet very stringent requirements. To be hired, drivers: * Shall meet or exceed licensing, training, and physical qualification for set forth in the Code of Federal Regulations (CFR): "Qualifications of Drivers" 49 CFR 391; and the Commercial Motor Vehicle Safety

  10. Microsoft Word - Energy Department Initiates Recertification Process for WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Department Initiates Recertification Process for WIPP CARLSBAD, N.M., March 26, 2014 - The U.S. Department of Energy (DOE) submitted its third Compliance Recertification Application (CRA) for the Waste Isolation Pilot Plant's (WIPP) to the U.S. Environmental Protection Agency (EPA), demonstrating continued compliance with EPA regulations for radioactive waste disposal, as required by Congress. The recertification process is not related to recovery efforts from the recent events at WIPP,

  11. 2014 2-24 WIPP radiological monitoring results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Immediate Release WIPP Reports New Environmental Monitoring Data CARLSBAD, N.M., February 24, 2014 - The U.S. Department of Energy (DOE) today reported new environmental monitoring data from samples collected at numerous locations on and around the Waste Isolation Pilot Plant (WIPP). Results indicate slightly elevated levels of airborne radioactive concentrations, which are consistent with the waste disposed of at WIPP. The samples taken demonstrate these concentrations remain well below a

  12. 10,000th Shipment Celebrated at WIPP

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M., October 24, 2011 – Approximately 130 people gathered at the U.S. Department of Energy’s (DOE’s) Waste Isolation Pilot Plant (WIPP) on October 22, to celebrate the 10,000th shipment of transuranic (TRU) waste to WIPP, which arrived safely late last month.

  13. First Savannah River Shipment Arrives At WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First Savannah River Site Shipment Arrives At WIPP CARLSBAD, N.M., May 10, 2001 - The U.S. Department of Energy's (DOE) Carlsbad Field Office today announced that the first shipment of defense-generated transuranic radioactive waste from DOE's Savannah River Site has arrived at the Waste Isolation Pilot Plant (WIPP). The shipment, which consisted of 42 drums of transuranic waste, left the Savannah River Site, near Aiken, South Carolina, at noon (EDT) on May 8, and arrived at WIPP today at 1:40

  14. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-03-05

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

  15. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-03-05

    his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

  16. DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT 1. CONTRACT PURPOSE The major purpose of this contract is to operate and maintain the Waste Isolation Pilot Plant (WIPP) and to implement the DOE's National Transuranic Waste program (NTP). The overall mission of the WIPP and the National Transuranic Waste Program is to protect human health and the environment by safe management, retrieval, characterization, transportation, and disposal of approved wastes. 2. BACKGROUND 2.1

  17. DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C-1 SECTION C PERFORMANCE WORK STATEMENT 1. CONTRACT PURPOSE The major purpose of this contract is to operate and maintain the Waste Isolation Pilot Plant (WIPP) and to implement the DOE's National Transuranic Waste program (NTP). The overall mission of the WIPP and the National Transuranic Waste Program is to protect human health and the environment by safe management, retrieval, characterization, transportation, and disposal of approved wastes. 2. BACKGROUND 2.1 Background: The WIPP is located

  18. Waste Isolation Pilot Plant Annual Site Environmental Report for 2012

    SciTech Connect (OSTI)

    2013-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2012 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year; Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS).

  19. Probative Investigation of the Thermal Stability of Wastes Involved...

    Office of Environmental Management (EM)

    Probative Investigation of the Thermal Stability of Wastes Involved in February 2014 Waste Isolation Pilot Plant (WIPP) Waste Drum Breach Event Probative Investigation of the...

  20. Key Geomechanics Issues at the Waste Isolation Pilot Plant Geomechanics

    SciTech Connect (OSTI)

    HANSEN,FRANCIS D.

    1999-09-01

    Mechanical and hydrological properties of rock salt provide excellent bases for geological isolation of hazardous materials. Regulatory compliance determinations for the Waste Isolation Pilot Plant (WIPP) stand as testament to the widely held conclusion that salt provides excellent isolation properties. The WIPP saga began in the 1950s when the U.S. National Academy of Sciences (NAS) recommended a salt vault as a promising solution to the national problem of nuclear waste disposal. For over 20 years, the Scientific basis for the NAS recommendation has been fortified by Sandia National Laboratories through a series of large scale field tests and laboratory investigations of salt properties. These scientific investigations helped develop a comprehensive understanding of salt's 4 reformational behavior over an applicable range of stresses and temperatures. Sophisticated constitutive modeling, validated through underground testing, provides the computational ability to model long-term behavior of repository configurations. In concert with advancement of the mechanical models, fluid flow measurements showed not only that the evaporite lithology was essentially impermeable but that the WIPP setting was hydrologically inactive. Favorable mechanical properties ensure isolation of materials placed in a salt geological setting. Key areas of the geomechanics investigations leading to the certification of WIPP are in situ experiments, laboratory tests, and shaft seal design.

  1. WIPP News Releases - 2002

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Receives Waste Characterized With Mobile System February 12 Ava Holland Joins DOE Carlsbad Field Office As Quality Assurance Manager January 7 WIPP Receives 500th Waste Shipment...

  2. The Waste Isolation Pilot Plant Hazardous Waste Facility Permit...

    Office of Environmental Management (EM)

    The Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan The Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan This ...

  3. WIPP News Releases - 2006

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Releases December 12 Idaho National Laboratory Waste Stream Cleared for Shipment to WIPP November 15 WIPP Reaches 4-Million-Hour Safety Milestone October 16 State of New Mexico...

  4. Microsoft Word - NR WIPP CONTRACT EXTENSION MAY 3 2010.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Extends Management and Operations Contract at Waste Isolation Pilot Plant Carlsbad, NM. - The U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) today announced a two-year extension of the Washington TRU Solutions LLC management and operations (M&O) contract. As the WIPP M&O contractor, Washington TRU Solutions is responsible for managing the National Transuranic (TRU) Waste Program, which includes retrieval, characterization, transportation, and disposal activities at

  5. Probative Investigation of the Thermal Stability of Wastes Involved in

    Energy Savers [EERE]

    February 2014 Waste Isolation Pilot Plant (WIPP) Waste Drum Breach Event | Department of Energy Probative Investigation of the Thermal Stability of Wastes Involved in February 2014 Waste Isolation Pilot Plant (WIPP) Waste Drum Breach Event Probative Investigation of the Thermal Stability of Wastes Involved in February 2014 Waste Isolation Pilot Plant (WIPP) Waste Drum Breach Event This document was used to determine facts and conditions during the Department of Energy Accident Investigation

  6. Waste Isolation Pilot Plant 2001 Site Environmental Report

    SciTech Connect (OSTI)

    Westinghouse TRU Solutions, Inc.

    2002-09-20

    The United States (U.S.) Department of Energy's (DOE) Carlsbad Field Office (CBFO) and Westinghouse TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2001 Site Environmental Report summarizes environmental data from calendar year (CY) 2001 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above Orders and guidance documents require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED). The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2001. WIPP received its first shipment of waste on March 26, 1999. In 2001, no evidence was found of any adverse effects from WIPP on the surrounding environment.

  7. Waste Isolation Pilot Plant CY 2000 Site Environmental Report

    SciTech Connect (OSTI)

    Westinghouse TRU Solutions, LLC; Environmental Science and Research Foundation, Inc.

    2001-12-31

    The U.S. Department of Energy's (DOE) Carlsbad Field Office and Westinghouse TRU Solutions, LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2000 Site Environmental Report summarizes environmental data from calendar year (CY) 2000 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T), and the Waste Isolation Pilot Plant Environmental Protect ion Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2000. The format of this report follows guidance offered in a June 1, 2001 memo from DOE's Office of Policy and Guidance with the subject ''Guidance for the preparation of Department of Energy (DOE) Annual Site Environmental Reports (ASERs) for Calendar Year 2000.'' WIPP received its first shipment of waste on March 26, 1999. In 2000, no evidence was found of any adverse effects from WIPP on the surrounding environment.

  8. Don Haward joins WIPP as manager of radiological control and emergency preparedness

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Don Harward Joins WIPP as Manager of Radiological Control and Emergency Preparedness CARLSBAD, N.M., May 12, 2000 - The Westinghouse Waste Isolation Division (WID) has named Don Harward as manager of Radiological Control and Emergency Preparedness at the Waste Isolation Pilot Plant (WIPP). Westinghouse is the management and operating contractor for the U.S. Department of Energy's Carlsbad Area Office at WIPP. "Don comes to the division with many years of experience in radiation safety and

  9. Microsoft Word - WIPP Monitoring Program Ensures Worker Safety1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Monitoring Program Ensures Worker Safety CARLSBAD, N.M., March 3, 2011 - Officials with the U.S. Department of Energy's (DOE's) Carlsbad Field Office (CBFO) are citing the recent accreditation of the Waste Isolation Pilot Plant (WIPP) Laboratory as a cause for reflection on the important role environmental monitoring has played during WIPP's 12-year history. In February, the WIPP Laboratory, which operates out of the Carlsbad Environmental Monitoring and Research Center (CEMRC), was accredited

  10. EM Releases WIPP Recovery Fact Sheet | Department of Energy

    Energy Savers [EERE]

    Releases WIPP Recovery Fact Sheet EM Releases WIPP Recovery Fact Sheet February 12, 2016 - 7:00pm Addthis CARLSBAD, N.M. - February 2016 marks two years since the underground fire and radiological release events forced the temporary closure of EM's Waste Isolation Pilot Plant (WIPP). Since that time, progress in the recovery of the underground has included mine stability and habitability, initial panel closure, radiological risk remediation, and the addition of an interim ventilation system.

  11. Fact Sheet Investigation of Incident at Waste Isolation Pilot Plant by

    Energy Savers [EERE]

    Technical Assessment Team | Department of Energy Fact Sheet Investigation of Incident at Waste Isolation Pilot Plant by Technical Assessment Team Fact Sheet Investigation of Incident at Waste Isolation Pilot Plant by Technical Assessment Team On February 14, 2014, an incident in Panel 7 Room 7 (P7R7) of the Waste Isolation Pilot Plant (WIPP) underground repository resulted in the release of radioactive material into the environment and contaminated 21 people with low-level radioactivity. The

  12. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 2, Chapter C, Appendix C1--Chapter C, Appendix C3 (beginning), Revision 3

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This volume contains appendices for the following: Rocky Flats Plant and Idaho National Engineering Laboratory waste process information; TRUPACT-II content codes (TRUCON); TRUPACT-II chemical list; chemical compatibility analysis for Rocky Flats Plant waste forms; chemical compatibility analysis for waste forms across all sites; TRU mixed waste characterization database; hazardous constituents of Rocky Flats Transuranic waste; summary of waste components in TRU waste sampling program at INEL; TRU waste sampling program; and waste analysis data.

  13. Actinide (III) solubility in WIPP Brine: data summary and recommendations

    SciTech Connect (OSTI)

    Borkowski, Marian; Lucchini, Jean-Francois; Richmann, Michael K.; Reed, Donald T.

    2009-09-01

    The solubility of actinides in the +3 oxidation state is an important input into the Waste Isolation Pilot Plant (WIPP) performance assessment (PA) models that calculate potential actinide release from the WIPP repository. In this context, the solubility of neodymium(III) was determined as a function of pH, carbonate concentration, and WIPP brine composition. Additionally, we conducted a literature review on the solubility of +3 actinides under WIPP-related conditions. Neodymium(III) was used as a redox-invariant analog for the +3 oxidation state of americium and plutonium, which is the oxidation state that accounts for over 90% of the potential release from the WIPP through the dissolved brine release (DBR) mechanism, based on current WIPP performance assessment assumptions. These solubility data extend past studies to brine compositions that are more WIPP-relevant and cover a broader range of experimental conditions than past studies.

  14. AIR DISPERSION MODELING AT THE WASTE ISOLATION PILOT PLANT

    SciTech Connect (OSTI)

    Rucker, D.F.

    2000-08-01

    One concern at the Waste Isolation Pilot Plant (WIPP) is the amount of alpha-emitting radionuclides or hazardous chemicals that can become airborne at the facility and reach the Exclusive Use Area boundary as the result of a release from the Waste Handling Building (WHB) or from the underground during waste emplacement operations. The WIPP Safety Analysis Report (SAR), WIPP RCRA Permit, and WIPP Emergency Preparedness Hazards Assessments include air dispersion calculations to address this issue. Meteorological conditions at the WIPP facility will dictate direction, speed, and dilution of a contaminant plume of respirable material due to chronic releases or during an accident. Due to the paucity of meteorological information at the WIPP site prior to September 1996, the Department of Energy (DOE) reports had to rely largely on unqualified climatic data from the site and neighboring Carlsbad, which is situated approximately 40 km (26 miles) to the west of the site. This report examines the validity of the DOE air dispersion calculations using new meteorological data measured and collected at the WIPP site since September 1996. The air dispersion calculations in this report include both chronic and acute releases. Chronic release calculations were conducted with the EPA-approved code, CAP88PC and the calculations showed that in order for a violation of 40 CFR61 (NESHAPS) to occur, approximately 15 mCi/yr of 239Pu would have to be released from the exhaust stack or from the WHB. This is an extremely high value. Hence, it is unlikely that NESHAPS would be violated. A site-specific air dispersion coefficient was evaluated for comparison with that used in acute dose calculations. The calculations presented in Section 3.2 and 3.3 show that one could expect a slightly less dispersive plume (larger air dispersion coefficient) given greater confidence in the meteorological data, i.e. 95% worst case meteorological conditions. Calculations show that dispersion will decrease slightly if a more stable wind class is assumed, where very little vertical mixing occurs. It is recommended that previous reports which used fixed values for calculating the air dispersion coefficient be updated to reflect the new meteorological data, such as the WIPP Safety Analysis Report and the WIPP Emergency Preparedness Hazards Assessment. It is also recommended that uncertainty be incorporated into the calculations so that a more meaningful assessment of risk during accidents can be achieved.

  15. Key regulatory drivers affecting shipments of mixed transuranic waste from Los Alamos National Laboratory to the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Schumann, P.B.; Bacigalupa, G.A.; Kosiewicz, S.T.; Sinkule, B.J.

    1997-02-01

    A number of key regulatory drivers affect the nature, scope, and timing of Los Alamos National Laboratory`s (LANL`s) plans for mixed transuranic (MTRU) waste shipments to the Waste Isolation Pilot Plant (WIPP), which are planned to commence as soon as possible following WIPP`s currently anticipated November, 1997 opening date. This paper provides an overview of some of the key drivers at LANL, particularly emphasizing those associated with the hazardous waste component of LANL`s MTRU waste (MTRU, like any mixed waste, contains both a radioactive and a hazardous waste component). The key drivers discussed here derive from the federal Resource Conservation and Recovery Act (RCRA) and its amendments, including the Federal Facility Compliance Act (FFCAU), and from the New Mexico Hazardous Waste Act (NMHWA). These statutory provisions are enforced through three major mechanisms: facility RCRA permits; the New Mexico Hazardous Waste Management Regulations, set forth in the New Mexico Administrative Code, Title 20, Chapter 4, Part 1: and compliance orders issued to enforce these requirements. General requirements in all three categories will apply to MTRU waste management and characterization activities at both WIPP and LANL. In addition, LANL is subject to facility-specific requirements in its RCRA hazardous waste facility permit, permit conditions as currently proposed in RCRA Part B permit applications presently being reviewed by the New Mexico Environment Department (NNED), and facility-specific compliance orders related to MTRU waste management. Likewise, permitting and compliance-related requirements specific to WIPP indirectly affect LANL`s characterization, packaging, record-keeping, and transportation requirements for MTRU waste. LANL must comply with this evolving set of regulatory requirements to begin shipments of MTRU waste to WIPP in a timely fashion.

  16. Waste Isolation Pilot Plant Annual Site Enviromental Report for 2008

    SciTech Connect (OSTI)

    Washington Regulatory and Enviromnetal Services

    2009-09-21

    The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2008 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to characterize site environmental management performance; summarize environmental occurrences and responses reported during the calendar year; confirm compliance with environmental standards and requirements; highlight significant facility programs and efforts; and describe how compliance and environmental improvement is accomplished through the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) Number NM4890139088-TSDF (treatment, storage, and disposal facility) further requires that the ASER be provided to the New Mexico Environment Department (NMED). The WIPP mission is to safely dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States. In 2008, 5,265 cubic meters (m3) of TRU waste were disposed of at the WIPP facility, including 5,216 m3 of contact-handled (CH) TRU waste and 49 m3 of remote-handled (RH) TRU waste. From the first receipt of waste in March 1999 through the end of 2008, 57,873 m3 of TRU waste had been disposed of at the WIPP facility.

  17. Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program

    SciTech Connect (OSTI)

    Connolly, M.J.; Sayer, D.L.

    1993-11-01

    EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

  18. WIPP Transportation Services Contract Award Announced by U.S...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    www.wipp.energy.gov Bill Taylor Environmental Management Consolidated Business Center (513) 246-0539 U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant...

  19. 100th WIPP Quarterly Meeting continues tradition of consultation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    75) 234-7327 www.wipp.energy.gov U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 DOENews For immediate release...

  20. Microsoft Word - WIPP Update 5_14_15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    14, 2015 Initial closure of Panel 6 complete with work in Panel 7, Room 7 in process Workers at the Waste Isolation Pilot Plant (WIPP) completed the initial closure of Panel 6,...

  1. DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant

    Office of Energy Efficiency and Renewable Energy (EERE)

    Cincinnati -- The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP) seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico.

  2. Technical Assessment Team Report on Cause of Breached Drum at Waste Isolation Pilot Plant Released

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – The U.S. Department of Energy today released a report by an independent team of technical experts that evaluated the mechanisms and chemical reactions contributing to the failure of a waste drum at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, N.M.

  3. First TRUPACT-III Shipment Arrives Safely at the Waste Isolation Pilot Plant

    Broader source: Energy.gov [DOE]

    Washington, D.C. - The U.S. Department of Energy (DOE) announced today that the first shipment of transuranic waste using the newly approved shipping package known as the TRUPACT-III safely arrived at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico.

  4. Waste Isolation Pilot Plant simulated RH TRU waste experiments: Data and interpretation pilot

    SciTech Connect (OSTI)

    Molecke, M.A.; Argueello, G.J.; Beraun, R.

    1993-04-01

    The simulated, i.e., nonradioactive remote-handled transuranic waste (RH TRU) experiments being conducted underground in the Waste Isolation Pilot Plant (WIPP) were emplaced in mid-1986 and have been in heated test operation since 9/23/86. These experiments involve the in situ, waste package performance testing of eight full-size, reference RH TRU containers emplaced in horizontal, unlined test holes in the rock salt ribs (walls) of WIPP Room T. All of the test containers have internal electrical heaters; four of the test emplacements were filled with bentonite and silica sand backfill materials. We designed test conditions to be ``near-reference`` with respect to anticipated thermal outputs of RH TRU canisters and their geometrical spacing or layout in WIPP repository rooms, with RH TRU waste reference conditions current as of the start date of this test program. We also conducted some thermal overtest evaluations. This paper provides a: detailed test overview; comprehensive data update for the first 5 years of test operations; summary of experiment observations; initial data interpretations; and, several status; experimental objectives -- how these tests support WIPP TRU waste acceptance, performance assessment studies, underground operations, and the overall WIPP mission; and, in situ performance evaluations of RH TRU waste package materials plus design details and options. We provide instrument data and results for in situ waste container and borehole temperatures, pressures exerted on test containers through the backfill materials, and vertical and horizontal borehole-closure measurements and rates. The effects of heat on borehole closure, fracturing, and near-field materials (metals, backfills, rock salt, and intruding brine) interactions were closely monitored and are summarized, as are assorted test observations. Predictive 3-dimensional thermal and structural modeling studies of borehole and room closures and temperature fields were also performed.

  5. CHARACTERIZATION THROUGH DATA QUALITY OBJECTIVES AND CERTIFICATION OF REMOTE-HANDLED TRANSURANIC WASTE GENERATOR/STORAGE SITES FOR SHIPMENT TO THE WIPP

    SciTech Connect (OSTI)

    Spangler, L.R.; Most, Wm.A.; Kehrman, R.F.; Gist, C.S.

    2003-02-27

    The Waste Isolation Pilot Plant (WIPP) is operating to receive and dispose of contact-handled (CH) transuranic (TRU) waste. The Department of Energy (DOE) Carlsbad Field Office (CBFO) is seeking approval from the Environmental Protection Agency (EPA) and the New Mexico Environment Department (NMED) of the remote-handled (RH) TRU characterization plan to allow disposal of RH TRU waste in the WIPP repository. In addition, the DOE-CBFO has received approval from the Nuclear Regulatory Commission (NRC) to use two shipping casks for transporting RH TRU waste. Each regulatory agency (i.e., EPA, NMED, and NRC) has different requirements that will have to be met through the use of information collected by characterizing the RH TRU waste. Therefore, the DOE-CBFO has developed a proposed characterization program for obtaining the RH TRU waste information necessary to demonstrate that the waste meets the applicable regulatory requirements. This process involved the development of a comprehensive set of Data Quality Objectives (DQOs) comprising the various regulatory requirements. The DOE-CBFO has identified seven DQOs for use in the RH TRU waste characterization program. These DQOs are defense waste determination, TRU waste determination, RH TRU determination, activity determination, RCRA physical and chemical properties, prohibited item determination, and EPA physical and chemical properties. The selection of the DQOs were based on technical, legal and regulatory drivers that assure the health and safety of the workers, the public, to protect the environment, and to comply with the requirements of the regulatory agencies. The DOE-CBFO also has the responsibility for the certification of generator/storage sites to ship RH TRU mixed waste to the WIPP for disposal. Currently, thirteen sites across the DOE complex are generators of RH TRU waste or store the waste at their location for other generators. Generator/storage site certification involves review and approval of site-specific programmatic documents that demonstrate compliance with the WIPP waste characterization and transportation requirements. Additionally, procedures must be developed to implement programmatic requirements and adequacy of those procedures determined. Finally, on-site audits evaluate the technical and administrative implementation and effectiveness of the operating procedures.

  6. Carlsbad Area Office unveils full-scale model of new WIPP waste transportation cask

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlsbad Area Office Unveils Full-Scale Model Of New WIPP Waste Transportation Cask CARLSBAD, N.M., February 23, 2000 - The U.S. Department of Energy's (DOE) Carlsbad Area Office today unveiled a full-scale model of its newest waste transportation cask, the RH-72B, during a ceremony at the local DOE offices. "This is another milestone for the Department of Energy," said Dr. Inés Triay, Manager of the Carlsbad Area Office, describing the importance of the new container for those

  7. Waste Isolation Pilot Plant Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Westinghouse Electric Company Waste Isolation Division

    1999-09-29

    DOE Order 5400.1, General Environmental Protection Program Requirements (DOE, 1990a), requires each DOE facility to prepare an EMP. This document is prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment (DOE, 1990b); Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) 834, Radiation Protection of the Public and Environment (Draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1 (DOE, 1995), which is the driver for the Annual Site Environmental Report (ASER) and the guidance source for preparing many environmental program documents. The WIPP project is operated by Westinghouse Electric Company, Waste Isolation Division (WID), for the DOE. This plan defines the extent and scope of the WIPP's effluent and environmental monitoring programs during the facility's operational life and also discusses the WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE, 1991). This document references DOE orders and other federal and state regulations affecting environmental monitoring programs at the site. WIPP procedures, which implement the requirements of this program plan, are also referenced. The DOE regulates its own activities for radiation protection of the public under the authority of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011). The effluent and environmental monitoring activities prescribed by DOE Order 5400.5 and the DOE/EH-0173T guidance manual are designed to ensure that DOE facilities implement standards and regulations to protect members of the public and the environment against undue risk from radiation. Effluent and environmental monitoring also provide 1999 Environmental Monitoring Plan DOE/WIPP 99-2194 the data necessary to demonstrate compliance with applicable environmental protection regulations. Other federal agencies, such as the U.S. Environmental Protection Agency (EPA), are empowered through specific legislation to regulate certain aspects of DOE activities potentially affecting public health and safety or the environment. Presidential Executive Order 12088, Federal Compliance with Pollution Control Standards (43 FR 47707), requires the heads of executive agencies to ensure that all federal facilities and activities comply with applicable pollution control standards and to take all necessary actions for the prevention, control, and abatement of environmental pollution. Beyond statutory requirements, the DOE has established a general environmental protection policy. The Environmental Policy Statement (issued by then Secretary Herrington on January 8, 1986, and extended on January 7, 1987) describes the DOE's commitment to national environmental protection goals in that it conducts operations ''in an environmentally safe and sound manner . . . in compliance with the letter and spirit of applicable environmental statutes, regulations, and standards'' (DOE, 1986). This Environmental Policy Statement also states the DOE's commitment to ''good environmental management in all of its programs and at all of its facilities in order to correct existing environmental problems, to minimize risks to the environment or public health, and to anticipate and address pote

  8. No-migration variance petition for the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Carnes, R.G.; Hart, J.S. ); Knudtsen, K. )

    1990-01-01

    The Waste Isolation Pilot Plant (WIPP) is a US Department of Energy (DOE) project to provide a research and development facility to demonstrate the safe disposal of radioactive waste resulting from US defense activities and programs. The DOE is developing the WIPP facility as a deep geologic repository in bedded salt for transuranic (TRU) waste currently stored at or generated by DOE defense installations. Approximately 60 percent of the wastes proposed to be emplaced in the WIPP are radioactive mixed wastes. Because such mixed wastes contain a hazardous chemical component, the WIPP is subject to requirements of the Resource Conservation and Recovery Act (RCRA). In 1984 Congress amended the RCRA with passage of the Hazardous and Solid Waste Amendments (HSWA), which established a stringent regulatory program to prohibit the land disposal of hazardous waste unless (1) the waste is treated to meet treatment standards or other requirements established by the Environmental Protection Agency (EPA) under {section}3004(n), or (2) the EPA determines that compliance with the land disposal restrictions is not required in order to protect human health and the environment. The DOE WIPP Project Office has prepared and submitted to the EPA a no-migration variance petition for the WIPP facility. The purpose of the petition is to demonstrate, according to the requirements of RCRA {section}3004(d) and 40 CFR {section}268.6, that to a reasonable degree of certainty, there will be no migration of hazardous constituents from the WIPP facility for as long as the wastes remain hazardous. This paper provides an overview of the petition and describes the EPA review process, including key issues that have emerged during the review. 5 refs.

  9. WIPP First Responders Earn Advanced Training Certifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 1, 2015 WIPP First Responders Earn Advanced Training Certifications Recovery activities at the Waste Isolation Pilot Plant continue to move in a positive direction. As part of increased emergency response capabilities, the WIPP Fire Department and Emergency Response Team are participating in advanced training, improving overall capabilities and receiving advanced certifications. Training and validation testing has included written examinations, as well as intense physical and practical

  10. WIPP TRU TeamWorks - About Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us TRU TeamWorks is an e-newsletter published for the Waste Isolation Pilot Plant team. Mission Statement: To provide WIPP employees and stakeholders with relevant, timely information that highlights project accomplishments, incorporates messages related to project goals and advances the WIPP viewpoint. Submissions: Have an article suggestion or submittal? Send an e-mail to the TRU TeamWorks staff.

  11. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    SciTech Connect (OSTI)

    Westinghouse TRU Solutions

    2000-12-01

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 1998, to March 31, 2000. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, and amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Area Office's (hereinafter the ''CAO'') compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. An issue was identified in the 1998 BECR relating to a potential cross-connection between the fire-water systems and the site domestic water system. While the CAO and its managing and operating contractor (hereinafter the ''MOC'') believe the site was always in compliance with cross-connection control requirements, hardware and procedural upgrades w ere implemented in March 1999 to strengthen its compliance posture. Further discussion of this issue is presented in section 30.2.2 herein. During this reporting period WIPP received two letters and a compliance order alleging violation of certain requirements outlined in section 9(a)(1) of the LWA. With the exception of one item, pending a final decision by the New Mexico Environment Department (NMED), all alleged violations have been resolved without the assessment of fines or penalties. Non-mixed TRU waste shipments began on March 26, 1999. Shipments continued through November 26, 1999, the effective date of the Waste Isolation Pilot Plant Hazardous Waste Facility Permit (NM4890139088-TSDF). No shipments regulated under the Hazardous Waste Facility Permit were received at WIPP during this BECR reporting period.

  12. WIPP Marks 12 Years of Operations | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M - On Saturday, March 26, 2011, the Department of Energy's Waste Isolation Pilot Plant marked another anniversary. It has now been 12 years since WIPP received its first shipment of transuranic (TRU) waste. TRU waste consists of clothing, tools, rags, debris, residues and other disposal items contaminated with radioactive elements - mostly plutonium. "WIPP employees and members of the community cheered when the first shipment of TRU

  13. A formal expert judgment procedure for performance assessments of the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Trauth, K.M.; Guzowski, R.V.; Hora, S.C.

    1994-09-01

    The Waste Isolation Pilot Plant (WIPP) is an experimental facility located in southeastern New Mexico. It has been designed to determine the feasibility of the geologic disposal of defense-generated transuranic waste in a deep bedded-salt formation. The WIPP was also designed for disposal and will operate in that capacity if approved. The WIPP Performance Assessment Department at Sandia National Laboratories has been conducting analyses to assess the long-term performance of the WIPP. These analyses sometimes require the use of expert judgment. This Department has convened several expert-judgment panels and from that experience has developed an internal quality-assurance procedure to guide the formal elicitation of expert judgment. This protocol is based on the principles found in the decision-analysis literature.

  14. Contact-Handled Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2005-12-29

    The purpose of this document is to summarize the waste acceptance criteria applicable to the transportation, storage, and disposal of contact-handled transuranic (CH-TRU) waste at the Waste Isolation Pilot Plant (WIPP). These criteria serve as the U.S. Department of Energy's (DOE) primary directive for ensuring that CH-TRU waste is managed and disposed of in a manner that protects human health and safety and the environment.The authorization basis of WIPP for the disposal of CH-TRU waste includes the U.S.Department of Energy National Security and Military Applications of Nuclear EnergyAuthorization Act of 1980 (reference 1) and the WIPP Land Withdrawal Act (LWA;reference 2). Included in this document are the requirements and associated criteriaimposed by these acts and the Resource Conservation and Recovery Act (RCRA,reference 3), as amended, on the CH-TRU waste destined for disposal at WIPP.|The DOE TRU waste sites must certify CH-TRU waste payload containers to thecontact-handled waste acceptance criteria (CH-WAC) identified in this document. Asshown in figure 1.0, the flow-down of applicable requirements to the CH-WAC istraceable to several higher-tier documents, including the WIPP operational safetyrequirements derived from the WIPP CH Documented Safety Analysis (CH-DSA;reference 4), the transportation requirements for CH-TRU wastes derived from theTransuranic Package Transporter-Model II (TRUPACT-II) and HalfPACT Certificates ofCompliance (references 5 and 5a), the WIPP LWA (reference 2), the WIPP HazardousWaste Facility Permit (reference 6), and the U.S. Environmental Protection Agency(EPA) Compliance Certification Decision and approval for PCB disposal (references 7,34, 35, 36, and 37). The solid arrows shown in figure 1.0 represent the flow-down of allapplicable payload container-based requirements. The two dotted arrows shown infigure 1.0 represent the flow-down of summary level requirements only; i.e., the sitesmust reference the regulatory source documents from the U.S. Nuclear RegulatoryCommission (NRC) and the New Mexico Environment Department (NMED) for acomprehensive and detailed listing of the requirements.This CH-WAC does not address the subject of waste characterization relating to adetermination of whether the waste is hazardous; rather, the sites are referred to theWaste Analysis Plan (WAP) contained in the WIPP Hazardous Waste Facility Permit fordetails of the sampling and analysis protocols to be used in determining compliance withthe required physical and chemical properties of the waste. Requirements andassociated criteria pertaining to a determination of the radiological properties of thewaste, however, are addressed in appendix A of this document. The collectiveinformation obtained from waste characterization records and acceptable knowledge(AK) serves as the basis for sites to certify that their CH-TRU waste satisfies the WIPPwaste acceptance criteria listed herein.

  15. Department of Energy Announces Selection of Transportation Contractors at the Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Announces Selection of Transportation Contractors at the Waste Isolation Pilot Plant Carlsbad, N.M., August 21, 2000 -- The U.S. Department of Energy (DOE) today announced the selection of Tri-State Motor Transit Co. (TSMT) and CAST Transportation, Inc. (CAST) to transport radioactive transuranic waste from DOE generator sites throughout the United States to the Waste Isolation Pilot Plant (WIPP) near Carlsbad, NM. Following a request for proposals issued on January 14,

  16. Waste Isolation Pilot Plant Update

    Office of Environmental Management (EM)

    Update J. R. Stroble Director, National TRU Program U.S. Department of Energy Carlsbad Field Office National Transportation Stakeholder Forum May 11, 2011 Denver, Colorado 2 2 Shipments received at WIPP to date: 9,493 Contact-handled: 9,019 Remote-handled: 474 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 44 84 366 947 818 1,002 98 8 997 1,144 730 1,032 Total Shipments by Calendar Year (Including intersite shipments) 1,194 CH TRU waste shipments only CH and RH TRU waste

  17. U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 Media Contact: Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 i For immediate release Magnum Minerals to Buy WIPP Salt CARLSBAD, N.M., December 21, 2009- The U.S. Department of Energy's (DOE) Carlsbad Field Office (CBFO) has worked out an agreement to sell 300,000 tons of run-of-mine salt from the Waste Isolation Pilot Plant (WIPP) to Magnum Minerals LLC of Hereford,

  18. Waste Isolation Pilot Plant Annual Site Environmental Report for 2010

    SciTech Connect (OSTI)

    2011-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) Characterize site environmental management performance. (2) Summarize environmental occurrences and responses reported during the calendar year. (3) Confirm compliance with environmental standards and requirements. (4) Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the WIPP. DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit Number NM4890139088-TSDF (Permit) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  19. WIPP Environmental Initiatives Earn DOE Recognition

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M., October 29, 2012 – The U.S. Department of Energy (DOE) recently recognized four initiatives at the Waste Isolation Pilot Plant (WIPP) and more than 20 people for improvements in energy, water and fleet efficiency while reducing pollution and waste across the DOE complex.

  20. WIPP 2004 Site Environmental Report

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC, Washington Regulatory and Environmental Services

    2005-09-30

    The mission of Waste Isolation Pilot Plant (WIPP) is to safely and permanently dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States (U.S.). In 2004, 8,839 cubic meters (m3) of TRU waste were emplaced at WIPP. From the first receipt of waste in March 1999 through the end of 2004, 25,809 m3 of TRU waste had been emplaced at WIPP. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of WIPP environmental resources. DOE Order 450.1, Environmental Protection Program; DOE Order 231.1A, Environment, Safety, and Health Reporting; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2004 Site Environmental Report (SER) summarizes environmental data from 2004 that characterize environmental management performance and demonstrate compliance with applicable federal and state regulations. This report was prepared in accordance with DOE Order 231.1A, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2004 (DOE, 2005). The order and the guidance require that DOE facilities submit an annual SER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) further requires that the SER be provided to the New Mexico Environment Department (NMED).

  1. Waste Isolation Pilot Plant Nitrate Salt Bearing Waste Container...

    Office of Environmental Management (EM)

    Nitrate Salt Bearing Waste Container Isolation Plan Waste Isolation Pilot Plant Nitrate Salt Bearing Waste Container Isolation Plan The purpose of this document is to provide the ...

  2. EXO project equipment successfully placed underground at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Carlsbad Field Office (505) 234-7327 Dennis.hurtt@wipp.ws http://www.wipp.energy.gov U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 DOENews For Immediate Release EXO project equipment successfully placed underground at WIPP Carlsbad, NM July 24, 2007 - The first two clean room modules for the Enriched Xenon Observatory (EXO) project have been successfully placed in the U.S. Department of Energy's (DOE) Waste Isolation

  3. Waste Isolation Pilot Plant Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2004-02-19

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not have detrimental effects on the environment. This EMP is to be reviewed annually and updated every three years unless otherwise requested by the DOE or contractor.

  4. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    SciTech Connect (OSTI)

    Washinton TRU Solutions LLC

    2002-09-30

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2000, to March 31, 2002. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Field Office's (CBFO) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. In the prior BECR, the CBFO and the management and operating contractor (MOC)committed to discuss resolution of a Letter of Violation that had been issued by the New Mexico Environment Department (NMED) in August 1999, which was during the previous BECR reporting period. This Letter of Violation alleged noncompliance with hazardous waste aisle spacing, labeling, a nd tank requirements. At the time of publication of the prior BECR, resolution of the Letter of Violation was pending. On July 7, 2000, the NMED issued a letter noting that the aisle spacing and labeling concerns had been adequately addressed and that they were rescinding the violation alleging that the Exhaust Shaft Catch Basin failed to comply with the requirements for a hazardous waste tank. During the current reporting period, WIPP received a Notice of Violation and a compliance order alleging the violation of the New Mexico Hazardous Waste Regulations and the WIPP Hazardous Waste Facility Permit (HWFP).

  5. Compliance status report for the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Not Available

    1994-03-31

    The US Department of Energy (DOE) is responsible for the disposition of transuranic (TRU) waste generated through national defense-related activities. Approximately 53,700 m{sup 2} of these wastes have been generated and are currently stored at government defense installations across the country. The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been sited and constructed to meet the criteria established by the scientific and regulatory community for the safe, long-term disposal of TRU and TRU-mixed wastes. This Compliance Status Report (CSR) provides an assessment of the progress of the WIPP Program toward compliance with long-term disposal regulations, set forth in Title 40 CFR 191 (EPA, 1993a), Subparts B and C, and Title 40 CFR {section}268.6 (EPA, 1993b), in order to focus on-going and future experimental and engineering activities. The CSR attempts to identify issues associated with the performance of the WIPP as a long-term repository and to focus on the resolution of these issues. This report will serve as a tool to focus project resources on the areas necessary to ensure complete, accurate, and timely submittal of the compliance application. This document is not intended to constitute a statement of compliance or a demonstration of compliance.

  6. WIPP Documents - EPA Certification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EPA Certification Compliance Certification Application DOE's 72,000-page application submitted to the U.S. Environmental Protection Agency showing how WIPP meets all applicable federal transuranic radioactive waste standards. (Click on CCA -1996) Compliance Recertification Application - 2004 The recertification application showing how WIPP continues to meet all applicable federal transuranic radioactive waste standards. Compliance Recertification Application - 2009 The recertification

  7. DOE Awards Grant to New Mexico Environment Department for Waste Isolation

    Office of Environmental Management (EM)

    Pilot Plant Oversight, Monitoring | Department of Energy Grant to New Mexico Environment Department for Waste Isolation Pilot Plant Oversight, Monitoring DOE Awards Grant to New Mexico Environment Department for Waste Isolation Pilot Plant Oversight, Monitoring September 19, 2012 - 12:00pm Addthis Media Contact Deb Gill deb.gill@wipp.ws 575-234-7270 Carlsbad, NM - The Department of Energy (DOE) today awarded a grant for an estimated $1.6 million to the New Mexico Environment Department

  8. Investigation of Incident at Waste Isolation Pilot Plant by Technical Assessment Team

    Energy Savers [EERE]

    Incident at Waste Isolation Pilot Plant by Technical Assessment Team March 2015 Overall Findings On February 14, 2014, an incident in Panel 7 Room 7 (P7R7) of the Waste Isolation Pilot Plant (WIPP) underground repository resulted in the release of radioactive material into the environment and contaminated 21 people with low-level radioactivity. The Technical Assessment Team (TAT) concluded that one drum, Drum 68660, was the source of radioactive contamination released during the February 14,

  9. Head of EM Visits Waste Isolation Pilot Plant for First Underground Tour

    Energy Savers [EERE]

    Since February Incidents | Department of Energy Visits Waste Isolation Pilot Plant for First Underground Tour Since February Incidents Head of EM Visits Waste Isolation Pilot Plant for First Underground Tour Since February Incidents October 16, 2014 - 12:00pm Addthis CBFO Manager Joe Franco, left, and EM Acting Assistant Secretary Mark Whitney discuss points of interest on a map of the WIPP underground. CBFO Manager Joe Franco, left, and EM Acting Assistant Secretary Mark Whitney discuss

  10. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 3: Appendix BIR Volume 1

    SciTech Connect (OSTI)

    1995-03-31

    The Waste Isolation Pilot Plant (WIPP) Transuranic Waste Baseline Inventory Report (WTWBIR) establishes a methodology for grouping wastes of similar physical and chemical properties, from across the US Department of Energy (DOE) transuranic (TRU) waste system, into a series of ``waste profiles`` that can be used as the basis for waste form discussions with regulatory agencies. The majority of this document reports TRU waste inventories of DOE defense sites. An appendix is included which provides estimates of commercial TRU waste from the West Valley Demonstration Project. The WIPP baseline inventory is estimated using waste streams identified by the DOE TRU waste generator/storage sites, supplemented by information from the Mixed Waste Inventory Report (MWIR) and the 1994 Integrated Data Base (IDB). The sites provided and/or authorized all information in the Waste Stream Profiles except the EPA (hazardous waste) codes for the mixed inventories. These codes were taken from the MWIR (if a WTWBIR mixed waste stream was not in MWIR, the sites were consulted). The IDB was used to generate the WIPP radionuclide inventory. Each waste stream is defined in a waste stream profile and has been assigned a waste matrix code (WMC) by the DOE TRU waste generator/storage site. Waste stream profiles with WMCs that have similar physical and chemical properties can be combined into a waste matrix code group (WMCG), which is then documented in a site-specific waste profile for each TRU waste generator/storage site that contains waste streams in that particular WMCG.

  11. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 1

    SciTech Connect (OSTI)

    1995-03-31

    The Waste Isolation Pilot Plant (WIPP) is a research and development facility for the demonstration of the permanent isolation of transuranic radioactive wastes in a geologic formation. The facility was constructed in southeastern New Mexico in a manner intended to meet criteria established by the scientific and regulatory community for the safe, long-term disposal of transuranic wastes. The US Department of Energy (DOE) is preparing an application to demonstrate compliance with the requirements outlined in Title 40, Part 191 of the Code of Federal Regulations (CFR) for the permanent disposal of transuranic wastes. As mandated by the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act of 1992, the US Environmental Protection Agency (EPA) must evaluate this compliance application and provide a determination regarding compliance with the requirements within one year of receiving a complete application. Because the WIPP is a very complex program, the DOE has planned to submit the application as a draft in two parts. This strategy will allow for the DOE and the EPA to begin technical discussions on critical WIPP issues before the one-year compliance determination period begins. This report is the first of these two draft submittals.

  12. Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2005 - June 2006, Volume 2, Supporting Data

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2007-03-25

    This report is a compilation of geotechnical data presented as plots for each active instrument installed in the underground at the Waste Isolation Pilot Plant (WIPP) through June 30, 2006. A summary of the geotechnical analyses that were performed using the enclosed data is provided in Volume 1 of the Geotechnical Analysis Report (GAR).

  13. Waste Isolation Pilot Plant's Excavated Salt Agreement Supports Conservation Education, Other Public Initiatives

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – Proceeds from a unique arrangement that turned excavated salt from EM’s Waste Isolation Pilot Plant (WIPP) into a usable commodity have supported an array of public projects, including field trips focusing on conservation education for about 600 elementary-age students.

  14. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect (OSTI)

    Washington TRU Solutions

    2002-09-24

    U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

  15. SEE HOW WE RUN...At WIPP, We Really Mean Business

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SEE HOW WE RUN At WIPP, We Really Mean Business CARLSBAD, N.M., December 10, 2001 - Early this year, Dr. Inés Triay, manager of the U.S. Department of Energy's (DOE) Carlsbad Field Office, challenged Waste Isolation Pilot Plant (WIPP) employees to operate the nation's first nuclear waste repository like a business. So, what do we mean when we say we run WIPP "like a business?" Is it the organizational charts? Production schedules? It's more about the innovators who are WIPP employees.

  16. DOE Completes Disposal Operations In Panel 5 of the WIPP Underground |

    Office of Environmental Management (EM)

    Department of Energy Disposal Operations In Panel 5 of the WIPP Underground DOE Completes Disposal Operations In Panel 5 of the WIPP Underground August 15, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - The U.S. Department of Energy (DOE) announced that disposal operations in Panel 5 of the Waste Isolation Pilot Plant (WIPP) underground repository are complete. Last month, the final contact-handled transuranic (CH-TRU) waste shipment was

  17. Consideration of nuclear criticality when disposing of transuranic waste at the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    RECHARD,ROBERT P.; SANCHEZ,LAWRENCE C.; STOCKMAN,CHRISTINE T.; TRELLUE,HOLLY R.

    2000-04-01

    Based on general arguments presented in this report, nuclear criticality was eliminated from performance assessment calculations for the Waste Isolation Pilot Plant (WIPP), a repository for waste contaminated with transuranic (TRU) radioisotopes, located in southeastern New Mexico. At the WIPP, the probability of criticality within the repository is low because mechanisms to concentrate the fissile radioisotopes dispersed throughout the waste are absent. In addition, following an inadvertent human intrusion into the repository (an event that must be considered because of safety regulations), the probability of nuclear criticality away from the repository is low because (1) the amount of fissile mass transported over 10,000 yr is predicted to be small, (2) often there are insufficient spaces in the advective pore space (e.g., macroscopic fractures) to provide sufficient thickness for precipitation of fissile material, and (3) there is no credible mechanism to counteract the natural tendency of the material to disperse during transport and instead concentrate fissile material in a small enough volume for it to form a critical concentration. Furthermore, before a criticality would have the potential to affect human health after closure of the repository--assuming that a criticality could occur--it would have to either (1) degrade the ability of the disposal system to contain nuclear waste or (2) produce significantly more radioisotopes than originally present. Neither of these situations can occur at the WIPP; thus, the consequences of a criticality are also low.

  18. WIPP Team Chosen as Overall Champion at National Mine Rescue Competition |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy CBFO Manager Joe Franco (sixth from left) with the WIPP Red Team and competition officials at the 2014 National Metal and Nonmetal Mine Rescue Competition. CBFO Manager Joe Franco (sixth from left) with the WIPP Red Team and competition officials at the 2014 National Metal and Nonmetal Mine Rescue Competition. CARLSBAD, N.M. - EM's Waste Isolation Pilot Plant (WIPP) Mine Rescue Red Team was selected as overall champion from among 41 teams that participated in the

  19. DOE Awards Contract for Management of WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEWS NEWS MEDIA CONTACTS: FOR IMMEDIATE RELEASE Tom Welch, 202/586-4316 October 12, 2000 Greg Sahd (Carlsbad), 505/234-7532 Department of Energy Competitively Awards Contract for the Management of Waste Isolation Pilot Plant Secretary of Energy Bill Richardson today announced that the Energy Department will award a $500 million, five-year contract for the management and operation of the department's Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico, to Westinghouse TRU Solutions LLC.

  20. Appendix MON: WIPP Monitoring Programs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MON-2014 WIPP Monitoring Programs United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix MON-2014 Table of Contents MON-1.0 Introduction MON-1.1 Compliance Monitoring Program MON-1.2 Preclosure and Postclosure Monitoring MON-1.3 Monitoring Assessment MON-1.4 Appendix Summary MON-2.0 Compliance Monitoring Program Requirements MON-2.1 Compliance Certification/Recertification MON-3.0 Preclosure

  1. Microsoft Word - WIPP Transportation Exhibit.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    immediate release New WIPP Transportation Exhibit Opens at the National Museum of Nuclear Science & History ALBUQUERQUE, N.M., November 2, 2011 - The National Museum of Nuclear Science & History will debut an exhibit on November 5, 2011, that features the transportation system used by the U.S. Department of Energy (DOE) to ship transuranic (TRU) waste from generator sites nationwide to the Waste Isolation Pilot Plant (WIPP) near Carlsbad, N.M. The exhibit includes a cut-away of the

  2. Enterprise Assessments Operational Awareness Record of Observations of the Design and Modification Progress of the Waste Isolation Pilot Plant Underground Interim Ventilation System and Supplemental Ventilation System November 2015

    Energy Savers [EERE]

    EA Operational Awareness Record Report Number: EA-WIPP-IVS/SVS-2015-11-15 Site: Waste Isolation Pilot Plant (WIPP) Subject: Observations of the design and modification progress of the WIPP Underground Interim Ventilation System and Supplemental Ventilation System Dates of Activity: 11/15/2015 - 11/19/2015 Report Preparer: Jeff Snook Activity Description / Purpose: The Office of Environment, Safety and Health Assessments within the Office of Enterprise Assessments (EA) is reviewing the design,

  3. Section 08: Approval Process for Waste Shipment From Waste Generator...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Approval Process for Waste Shipment From Waste Generator Sites for Disposal at the WIPP (40 CFR 194.8) United States Department of Energy Waste Isolation Pilot Plant Carlsbad...

  4. EA-1340: Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site, Carlsbad, New Mexico

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to make maximum use of existing U.S. Department of Energy Waste Isolation Pilot Plant (WIPP) facilities to further the scientific...

  5. Carlsbad Field Office Recognized by New Mexico and DOE for Environmental Excellence at WIPP

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – The Department of Energy (DOE) Carlsbad Field Office (CBFO) was selected for top recognition for environmental stewardship and for reducing energy, water and paper usage at the DOE’s Waste Isolation Pilot Plant (WIPP).

  6. DOE Hosts German Energy Official, Signs MOU to Share WIPP Information

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – A high-ranking energy official from Germany formalized a partnership between her country and the United States during a recent visit to the Waste Isolation Pilot Plant (WIPP).

  7. WIPP Recertification - An Environmental Evaluation Group Perspective

    SciTech Connect (OSTI)

    Allen, L. E.; Silva, M. K.

    2003-02-25

    The Waste Isolation Pilot Plant (WIPP), a repository for defense transuranic (TRU) waste, was built and is operated by the U.S. Department of Energy (DOE). The WIPP Land Withdrawal Act (LWA) required initial certification of compliance of the WIPP by the U.S. Environmental Protection Agency (EPA). In addition, a recertification decision is required by the LWA every five years, dated from the initial receipt of TRU waste. The first TRU waste shipment arrived at the WIPP on March 26, 1999, and therefore the first recertification application is due from DOE to EPA by March 25, 2004. The Environmental Evaluation Group (EEG) provides technical oversight of the WIPP project on behalf of the State of New Mexico. The EEG considers the first recertification as a precedent setting event. Therefore, the EEG began the identification of recertification issues immediately following the initial certification decision. These issues have evolved since that time, based on discussions with the DOE and EEG's understanding of DOE's ongoing research. Performance assessment is required by the EPA certification and its results are needed to determine whether the facility remains in compliance at the time of the recertification application. The DOE must submit periodic change reports to the EPA which summarize activities and conditions that differ from the compliance application. Also, the EPA may request additional information from the DOE that may pertain to continued compliance. These changes and new information must be considered for recertification performance assessment.

  8. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Stakeholder Information Index 2016 WIPP Stakeholder Information Documents 2015 WIPP Stakeholder Information Documents 2014 WIPP Stakeholder Information Documents 2013 WIPP Stakeholder Information Documents 2012 WIPP Stakeholder Information Documents 2011 WIPP Stakeholder Information Documents 2010 WIPP Stakeholder Information Documents 2009 WIPP Stakeholder Information Documents 2008 WIPP Stakeholder Information Documents 2007 WIPP Stakeholder Information Documents 2006 WIPP Stakeholder

  9. Radionuclide inventory for the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Not Available

    1991-12-31

    This report updates the information previously submitted in the draft report DOE/WIPP 88-005, Radionuclide Source Term for the WIPP, dated 1987 (reference 1). The information in this report provides the projected radionuclide inventory at the WIPP based on the projected waste receipts through the year 2013. The information is based on the 1991 TRU Program Data submittals for the Integrated Data Base (DOE/RW-0006, Rev. 7) from each of the DOE sites generating or storing TRU waste for shipment to the WIPP. The data is based on existing characterization data on the waste in interim storage, waste estimates based on projected programs during the 1991 through 2013 time period, projected treatment processes required to meet WIPP Waste Acceptance Criteria (WAC), and a projection of the waste that will be declared low level waste when it is assayed as part of the certification program for waste shipments to WIPP. This data will serve as a standard reference for WIPP programs requiring radionuclide data, including safety programs, performance assessment, and regulatory compliance. These projections will continue to be periodically updated as the waste data estimates are refined by the generator sites as they participate in the annual update of the Integrated Data Base (IDB).

  10. Waste Isolation Pilot Plant Recovery Plan Revision 0 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    This Recovery Plan provides a safe and compliant approach to resuming operations at the Waste Isolation Pilot Plant (WIPP), the repository for disposal of the nation's defense transuranic (TRU) waste. The U.S. Department of Energy (DOE) is committed to resuming operations by the first quarter of calendar year 2016, and this Recovery Plan outlines the Department's approach to meet that schedule while prioritizing safety, health, and environmental protection. The recovery and resumption of TRU

  11. Waste Isolation Pilot Plant Annual Site Environmental Report for 2014. Emended

    SciTech Connect (OSTI)

    none,

    2015-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2014 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year (CY); Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE environmental sustainability goals made through implementation of the WIPP Environmental Management System (EMS).

  12. WIPP Performance Assessment: Current Status and the Road Ahead | Department

    Office of Environmental Management (EM)

    of Energy Performance Assessment: Current Status and the Road Ahead WIPP Performance Assessment: Current Status and the Road Ahead Presentation from the 2015 Annual Performance and Risk Assessment (P&RA) Community of Practice (CoP) Technical Exchange Meeting held in Richland, Washington on December 15-16, 2015. PDF icon WIPP Performance Assessment: Current Status and the Road Ahead More Documents & Publications Performance Assessment Updates for Waste Isolation Pilot Plant

  13. Anniversary of Fire, Radiological Events Marks Major Progress at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 12, 2016 Anniversary of Fire, Radiological Events Marks Major Progress at WIPP February 2016 marks two years since the underground fire and radiological release events forced the temporary closure of the Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico. Since that time much progress has been made in the recovery of the underground including mine stability and habitability, initial panel closure, radiological risk remediation and the addition of

  14. WIPP Mobile Loading Unit Contract - 8-27-12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Awards Contract for WIPP Mobile Loading Unit Services Cincinnati, Ohio, August 27, 2012 - The U.S. Department of Energy (DOE) today awarded a competitive small business contract to Celeritex, LLC, (a Joint Venture between Project Services Group, LLC and DeNuke Contracting Services Inc.) of Suwanee, Georgia. The contract is to provide Mobile Loading Unit services in support of the National TRU Program and the DOE Carlsbad Field Office (CBFO) at the Waste Isolation Pilot Plant (WIPP) in New

  15. Final - WIPP Honored at Sustainable Business Summit 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Immediate Release WIPP Honored for Sustainability CARLSBAD, N.M., September 18, 2013 - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) was recognized as one of two finalists at the New Mexico Sustainable Business Summit held in Albuquerque in August 2013. The second annual summit, presented by Albuquerque Business First and the New Mexico Green Chamber of Commerce (NMGCC), is a business expo and awards luncheon to recognize organizations that have "green"

  16. Microsoft Word - WIPP Update 3_10_14 rev.1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 10, 2014 WIPP UPDATE: Planning Continues for Manned Entry PERSONNEL ENTRY OF THE MINE After this weekend's successful probe entry into the Salt Handling and Air Intake Shafts at the Waste Isolation Pilot Plant, plans to send personnel into the mine to learn the cause of the recent radiation release are being developed and reviewed. WIPP personnel will perform Mine Safety and Health Administration-required inspections of both the Salt Handling and Air Intake Shafts this week. If all of the

  17. Information Lag in Certification and Recertification of WIPP

    SciTech Connect (OSTI)

    Casey, S. C.; Patterson, R. L.; Shoemaker, P. E.

    2003-02-25

    The DOE established a Waste Isolation Pilot Plant (WIPP) Recertification Project to ensure the timely completion of the documentation to meet the requirement of the WIPP Land Withdrawal Act (LWA) (1) to demonstrate continued compliance with U.S. Environmental Protection Agency (EPA) disposal regulations at five-year intervals. This paper describes the reason for the self-imposed ''blackout'' period and provides an outline of the compliance process.

  18. Enterprise Assessments Operational Awareness Record, Waste Isolation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operational Awareness Record, Waste Isolation Pilot Plant - March 2015 March 2015 Review of the Waste Isolation Pilot Plant Limited Review of Engineering Configuration...

  19. Source Term Analysis for the Waste Isolation Pilot Plant (WIPP...

    Office of Environmental Management (EM)

    Quality Control Inspector (QCI) Pre-Exam Quiz U.S. Department of Energy Building Energy Data Exchange Specification Alignment: Achieving Management & Operational Excellence...

  20. http://www.wipp.ws/TeamWorks/truteamworks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/04 Shipments expected this week: RFETS (13), SRS (6) A weekly e-newsletter for the Waste Isolation Pilot Plant team February 12, 2004 The Big Story SEGA and MEGA exemplify science@wipp Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Tools Acronym List Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 02/12/04 at 9:24 a.m.)

  1. http://www.wipp.ws/TeamWorks/truteamworks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9/04 Shipments expected this week: SRS (6) A weekly e-newsletter for the Waste Isolation Pilot Plant team February 19, 2004 The Big Story WIPP public information meetings held Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Tools Acronym List Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 02/19/04 at 6:55 a.m.) Shipments scheduled

  2. http://www.wipp.ws/TeamWorks/truteamworks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    25/04 | Shipments expected for the week 3/28/04 through 4/3/04: INEEL (2), RFETS (11), SRS (6) A weekly e-newsletter for the Waste Isolation Pilot Plant team March 25, 2004 The Big Story AMWTP sends first shipment to WIPP Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP

  3. WIPP Monitoring Program Ensures Worker Safety | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Monitoring Program Ensures Worker Safety WIPP Monitoring Program Ensures Worker Safety March 3, 2011 - 12:00pm Addthis Media Contact Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M. - Officials with the U.S. Department of Energy's (DOE's) Carlsbad Field Office (CBFO) are citing the recent accreditation of the Waste Isolation Pilot Plant (WIPP) Laboratory as a cause for reflection on the important role environmental monitoring has played during WIPP's 12-year history. In

  4. WIPP UPDATE: April 9, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Today, WIPP crews began removing soot that accumulated in the Waste Hoist Tower and Control Room during the February 5 salt truck fire. They are using vacuums with...

  5. WIPP_Marks_12_Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with radioactive elements - mostly plutonium. "WIPP employees and members of the community cheered when the first shipment of TRU waste arrived here in 1999," said Acting...

  6. WIPP Employee Inducted Into Mine Rescue Hall of Fame- WIPP Teams Recognized at National Competition

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M., August 2, 2013 - Long-time Waste Isolation Pilot Plant (WIPP) employee Gary Kessler was inducted into the Metal/Non-Metal National Mine Rescue Hall of Fame on Aug. 1, 2013 at the biennial mine rescue competition in Reno, Nevada.

  7. WIPP Receives Green Zia Award for Environmental Excellence

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M., August 16, 2012– The Waste Isolation Pilot Plant (WIPP), the U.S. Department of Energy (DOE) facility known as the nation’s only deep geologic repository for the permanent disposal of radioactive waste, was recently honored for its pollution prevention efforts for the second year in a row.

  8. PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE

    Broader source: Energy.gov [DOE]

    Carlsbard, NM - The effectiveness of the Waste Isolation Pilot Plant’s (WIPP) preventive maintenance program paid huge dividends late last month when an issue with a steel rope on the project’s waste conveyance was identified during a routine inspection.

  9. Microsoft Word - WIPP Rad Event Report Phase 2 04.16.2015.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Phase 2 Radiological Release Event at the Waste Isolation Pilot Plant, February 14, 2014 April 2015 Radiological Release Event at the Waste Isolation Pilot Plant Radiological Release Event at the Waste Isolation Pilot Plant Disclaimer On February 14, 2014, an airborne radiological release occurred at the Department of Energy Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. On March 4, 2014, an Accident Investigation Board (the Board) was appointed by Matthew Moury, Deputy Assistant

  10. WIPP | U.S. Department of Energy | Waste Isolation Pilot Plant (WIPP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  11. Waste Isolation Pilot Plant Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2008-03-12

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  12. Simultaneous Thermal Analysis of WIPP and LANL Waste Drum Samples: A Preliminary Report

    SciTech Connect (OSTI)

    Wayne, David M.

    2015-10-19

    On Friday, February 14, 2014, an incident in P7R7 of the WIPP underground repository released radioactive material into the environment. The direct cause of the event was a breached transuranic (TRU) waste container, subsequently identified as Drum 68660. Photographic and other evidence indicates that the breach of 68660 was caused by an exothermic event. Subsequent investigations (Britt, 2015; Clark and Funk, 2015; Wilson et al., 2015; Clark, 2015) indicate that the combination of nitrate salts, pH neutralizing chemicals, and organic-based adsorbent represented a potentially energetic mixture. The materials inside the breached steel drum consisted of remediated, 30- to 40-year old, Pu processing wastes from LANL. The contents were processed and repackaged in 2014. Processing activities at LANL included: 1) neutralization of acidic liquid contents, 2) sorption of the neutralized liquid, and 3) mixing of acidic nitrate salts with an absorber to meet waste acceptance criteria. The contents of 68660 and its sibling, 68685, were derived from the same parent drum, S855793. Drum S855793 originally contained ten plastic bags of acidic nitrate salts, and four bags of mixed nitrate and oxalate salts generated in 1985 by Pu recovery operations. These salts were predominantly oxalic acid, hydrated nitrate salts of Mg, Ca, and Fe, anhydrous Na(NO3), and minor amounts of anhydrous and hydrous nitrate salts of Pb, Al, K, Cr, and Ni. Other major components include sorbed water, nitric acid, dissolved nitrates, an absorbent (Swheat Scoop) and a neutralizer (KolorSafe). The contents of 68660 are described in greater detail in Appendix E of Wilson et al. (2015)

  13. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services

    2006-10-12

    This Biennial Environmental Compliance Report (BECR) documents compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste. This BECR covers the reporting period from April 1, 2004, to March 31, 2006. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents United States (U.S.) Department of Energy (DOE) compliance with regulations and permits issued pursuant to the following: (1) Title 40 Code of Federal Regulations (CFR) Part 191, Subpart A, "Environmental Standards for Management and Storage"; (2) Clean Air Act (CAA) (42 United States Code [U.S.C.] 7401, et seq.); (3) Solid Waste Disposal Act (SWDA) (42 U.S.C. 6901-6992, et seq.); (4) Safe Drinking Water Act (SDWA) (42 U.S.C. 300f, et seq.); (5) Toxic Substances Control Act (TSCA) (15 U.S.C. 2601, et seq.); (6) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. 9601, et seq.); and all other federal and state of New Mexico laws pertaining to public health and safety or the environment.

  14. Overview of actinide chemistry in the WIPP

    SciTech Connect (OSTI)

    Borkowski, Marian; Lucchini, Jean - Francois; Richmann, Michael K; Reed, Donald T; Khaing, Hnin; Swanson, Juliet

    2009-01-01

    The year 2009 celebrates 10 years of safe operations at the Waste Isolation Pilot Plant (WIPP), the only nuclear waste repository designated to dispose defense-related transuranic (TRU) waste in the United States. Many elements contributed to the success of this one-of-the-kind facility. One of the most important of these is the chemistry of the actinides under WIPP repository conditions. A reliable understanding of the potential release of actinides from the site to the accessible environment is important to the WIPP performance assessment (PA). The environmental chemistry of the major actinides disposed at the WIPP continues to be investigated as part of the ongoing recertification efforts of the WIPP project. This presentation provides an overview of the actinide chemistry for the WIPP repository conditions. The WIPP is a salt-based repository; therefore, the inflow of brine into the repository is minimized, due to the natural tendency of excavated salt to re-seal. Reducing anoxic conditions are expected in WIPP because of microbial activity and metal corrosion processes that consume the oxygen initially present. Should brine be introduced through an intrusion scenario, these same processes will re-establish reducing conditions. In the case of an intrusion scenario involving brine, the solubilization of actinides in brine is considered as a potential source of release to the accessible environment. The following key factors establish the concentrations of dissolved actinides under subsurface conditions: (1) Redox chemistry - The solubility of reduced actinides (III and IV oxidation states) is known to be significantly lower than the oxidized forms (V and/or VI oxidation states). In this context, the reducing conditions in the WIPP and the strong coupling of the chemistry for reduced metals and microbiological processes with actinides are important. (2) Complexation - For the anoxic, reducing and mildly basic brine systems in the WIPP, the most important inorganic complexants are expected to be carbonate/bicarbonate and hydroxide. There are also organic complexants in TRU waste with the potential to strongly influence actinide solubility. (3) Intrinsic and pseudo-actinide colloid formation - Many actinide species in their expected oxidation states tend to form colloids or strongly associate with non actinide colloids present (e.g., microbial, humic and organic). In this context, the relative importance of actinides, based on the TRU waste inventory, with respect to the potential release of actinides from the WIPP, is greater for plutonium and americium, and to less extent for uranium and thorium. The most important oxidation states for WIPP-relevant conditions are III and IV. We will present an update of the literature on WIPP-specific data, and a summary of the ongoing research related to actinide chemistry in the WIPP performed by the Los Alamos National Laboratory (LANL) Actinide Chemistry and Repository Science (ACRSP) team located in Carlsbad, NM [Reed 2007, Lucchini 2007, and Reed 2006].

  15. Waste Isolation Pilot Plant | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations The mission of the Waste Isolation Pilot Plant site is to provide permanent, underground disposal of TRU and TRU-mixed wastes (wastes that also have hazardous chemical components). TRU waste consists of clothing, tools, and debris left from the research and production of nuclear weapons. TRU waste is contaminated with small amounts of plutonium and other TRU

  16. Robust Solution to Difficult Hydrogen Issues When Shipping Transuranic Waste to the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Countiss, S. S.; Basabilvazo, G. T.; Moody, D. C. III; Lott, S. A.; Pickerell, M.; Baca, T.; CH2M Hill; Tujague, S.; Svetlik, H.; Hannah, T.

    2003-02-27

    The Waste Isolation Pilot Plant (WIPP) has been open, receiving, and disposing of transuranic (TRU) waste since March 26, 1999. The majority of the waste has a path forward for shipment to and disposal at the WIPP, but there are about two percent (2%) or approximately 3,020 cubic meters (m{sup 3}) of the volume of TRU waste (high wattage TRU waste) that is not shippable because of gas generation limits set by the U.S. Nuclear Regulatory Commission (NRC). This waste includes plutonium-238 waste, solidified organic waste, and other high plutonium-239 wastes. Flammable gases are potentially generated during transport of TRU waste by the radiolysis of hydrogenous materials and therefore, the concentration at the end of the shipping period must be predicted. Two options are currently available to TRU waste sites for solving this problem: (1) gas generation testing on each drum, and (2) waste form modification by repackaging and/or treatment. Repackaging some of the high wattage waste may require up to 20:1 drum increase to meet the gas generation limits of less than five percent (5%) hydrogen in the inner most layer of confinement (the layer closest to the waste). (This is the limit set by the NRC.) These options increase waste handling and transportation risks and there are high costs and potential worker exposure associated with repackaging this high-wattage TRU waste. The U.S. Department of Energy (DOE)'s Carlsbad Field Office (CBFO) is pursuing a twofold approach to develop a shipping path for these wastes. They are: regulatory change and technology development. For the regulatory change, a more detailed knowledge of the high wattage waste (e.g., void volumes, gas generation potential of specific chemical constituents) may allow refinement of the current assumptions in the gas generation model for Safety Analysis Reports for Packaging for Contact-Handled (CH) TRU waste. For technology development, one of the options being pursued is the use of a robust container, the ARROW-PAK{trademark} System. (1) The ARROW-PAK{trademark} is a macroencapsulation treatment technology, developed by Boh Environmental, LLC, New Orleans, Louisiana. This technology has been designed to withstand any unexpected hydrogen deflagration (i.e. no consequence) and other benefits such as criticality control.

  17. An introduction to the mechanics of performance assessment using examples of calculations done for the Waste Isolation Pilot Plant between 1990 and 1992. Revision

    SciTech Connect (OSTI)

    Rechard, R.P.

    1996-06-01

    This document provides an overview of the processes used to access the performance of the Waste Isolation Pilot Plant (WIPP). The quantitative metrics used in the performance-assessment (PA) process are those put forward in the Environmental Protection Agency`s Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, HIgh-LEvel and transuranic radioactive Wastes (40 CFR 191).

  18. WIPP - Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quick links TRUPACT-II Shipping Container RH-72B Shipping Cask Waste Handling Waste Emplacement First Waste Shipment to WIPP March 26, 1999 Video Clips Instructions for playing video clips in Flash format: 1. Click on the screen you wish to view 2. Click on the play button TRUPACT-II Shipping Container The TRUPACT-II shipping container is certified by the Nuclear Regulatory Commission for shipping contact-handled transuranic waste to WIPP. It can hold up to 14 55-gallon drums or the equivalent.

  19. Radiological Release Event at the Waste Isolation Pilot Plant, February 14, 2014

    Broader source: Energy.gov [DOE]

    On February 14, 2014, an airborne radiological release occurred at the Department of Energy Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Because access to the underground was restricted following the event, the investigation was broken into two phases. The Phase 1 report focused on how the radiological material was released into the atmosphere and Phase 2, performed once limited access to the underground was re?established, focused on the source of the released radiological material.

  20. Microsoft Word - Final Release of Two Photos and Captions for WIPP Exhibit Debut _2_.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE- ###DRMMYY Photos of New WIPP Transportation Exhibit's Debut At the National Museum of Nuclear Science and History CARLSBAD, N.M., November 9, 2011- Photo #1 caption: A visitor takes a look at the new Waste Isolation Pilot Plant (WIPP) transportation exhibit that was unveiled November 5, 2011 in Albuquerque, N.M. at the National Museum of Nuclear Science and History. A cutaway of the TRUPACT-II, a transportation package used for shipping transuranic waste to WIPP near Carlsbad, N.M., is the

  1. Waste Isolation Pilot Plant Nitrate Salt Bearing Waste Container

    Office of Environmental Management (EM)

    Nitrate Salt Bearing Waste Container Isolation Plan Prepared in Response to New Mexico ... (DOE) and Nuclear Waste Partnership LLC (NWP), collectively referred to as the Permittees. ...

  2. Waste Isolation Pilot Plant | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Operators prepare drums of contact-handled transuranic waste for loading into transportation containers Operators prepare drums of contact-handled transuranic waste for loading into transportation containers A transuranic waste shipment travels on an approved shipping route to the Waste Isolation Pilot Plant A transuranic waste shipment travels on an approved shipping route to the Waste Isolation Pilot Plant Operators prepare drums of contact-handled transuranic waste for loading into

  3. Sandia WIPP calibration traceability

    SciTech Connect (OSTI)

    Schuhen, M.D.; Dean, T.A.

    1996-05-01

    This report summarizes the work performed to establish calibration traceability for the instrumentation used by Sandia National Laboratories at the Waste Isolation Pilot Plant (WIPP) during testing from 1980-1985. Identifying the calibration traceability is an important part of establishing a pedigree for the data and is part of the qualification of existing data. In general, the requirement states that the calibration of Measuring and Test equipment must have a valid relationship to nationally recognized standards or the basis for the calibration must be documented. Sandia recognized that just establishing calibration traceability would not necessarily mean that all QA requirements were met during the certification of test instrumentation. To address this concern, the assessment was expanded to include various activities.

  4. Hanford Site Transuranic (TRU) Waste Certification Plan

    SciTech Connect (OSTI)

    GREAGER, T.M.

    2000-12-06

    As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation Pilot Plant (WIPP), the Hanford Site must ensure that its TRU waste meets the requirements of US. Department of Energy (DOE) 0 435.1, ''Radioactive Waste Management,'' and the Contact-Handled (CH) Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WIPP-WAC). WIPP-WAC requirements are derived from the WIPP Technical Safety Requirements, WIPP Safety Analysis Report, TRUPACT-II SARP, WIPP Land Withdrawal Act, WIPP Hazardous Waste Facility Permit, and Title 40 Code of Federal Regulations (CFR) 191/194 Compliance Certification Decision. The WIPP-WAC establishes the specific physical, chemical, radiological, and packaging criteria for acceptance of defense TRU waste shipments at WIPP. The WPP-WAC also requires that participating DOE TRU waste generator/treatment/storage sites produce site-specific documents, including a certification plan, that describe their program for managing TRU waste and TRU waste shipments before transferring waste to WIPP. Waste characterization activities provide much of the data upon which certification decisions are based. Waste characterization requirements for TRU waste and TRU mixed waste that contains constituents regulated under the Resource Conservation and Recovery Act (RCRA) are established in the WIPP Hazardous Waste Facility Permit Waste Analysis Plan (WAP). The Hanford Site Quality Assurance Project Plan (QAPjP) (HNF-2599) implements the applicable requirements in the WAP and includes the qualitative and quantitative criteria for making hazardous waste determinations. The Hanford Site must also ensure that its TRU waste destined for disposal at WPP meets requirements for transport in the Transuranic Package Transporter-11 (TRUPACT-11). The US. Nuclear Regulatory Commission (NRC) establishes the TRUPACT-11 requirements in the Safety Analysis Report for the TRUPACT-II Shipping Package (TRUPACT-11 SARP). In addition, a TRU waste is eligible for disposal at WIPP only if it has been generated in whole or in part by one or more of the activities listed in Section 10101(3) of the Nuclear Waste Policy Act. DOE sites must determine that each waste stream to be disposed of at WIPP is ''defense'' TRU waste. (See also the definition of ''defense'' TRU waste.). Only CH TRU wastes meeting the requirements of the QAPjP, WIPP-WAP, WPP-WAC, and other requirements documents described above will be accepted for transportation and disposal at WIPP.

  5. Hanford Site Transuranic (TRU) Waste Certification Plan

    SciTech Connect (OSTI)

    GREAGER, T.M.

    2000-12-01

    As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation Pilot Plant (WIPP), the Hanford Site must ensure that its TRU waste meets the requirements of US. Department of Energy (DOE) 0 435.1, ''Radioactive Waste Management,'' and the Contact-Handled (CH) Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WIPP-WAC). WIPP-WAC requirements are derived from the WIPP Technical Safety Requirements, WIPP Safety Analysis Report, TRUPACT-II SARP, WIPP Land Withdrawal Act, WIPP Hazardous Waste Facility Permit, and Title 40 Code of Federal Regulations (CFR) 191/194 Compliance Certification Decision. The WIPP-WAC establishes the specific physical, chemical, radiological, and packaging criteria for acceptance of defense TRU waste shipments at WIPP. The WPP-WAC also requires that participating DOE TRU waste generator/treatment/storage sites produce site-specific documents, including a certification plan, that describe their program for managing TRU waste and TRU waste shipments before transferring waste to WIPP. Waste characterization activities provide much of the data upon which certification decisions are based. Waste characterization requirements for TRU waste and TRU mixed waste that contains constituents regulated under the Resource Conservation and Recovery Act (RCRA) are established in the WIPP Hazardous Waste Facility Permit Waste Analysis Plan (WAP). The Hanford Site Quality Assurance Project Plan (QAPjP) (HNF-2599) implements the applicable requirements in the WAP and includes the qualitative and quantitative criteria for making hazardous waste determinations. The Hanford Site must also ensure that its TRU waste destined for disposal at WPP meets requirements for transport in the Transuranic Package Transporter-11 (TRUPACT-11). The US. Nuclear Regulatory Commission (NRC) establishes the TRUPACT-11 requirements in the Safety Analysis Report for the TRUPACT-II Shipping Package (TRUPACT-11 SARP). In addition, a TRU waste is eligible for disposal at WIPP only if it has been generated in whole or in part by one or more of the activities listed in Section 10101(3) of the Nuclear Waste Policy Act. DOE sites must determine that each waste stream to be disposed of at WIPP is ''defense'' TRU waste. (See also the definition of ''defense'' TRU waste.). Only CH TRU wastes meeting the requirements of the QAPjP, WIPP-WAP, WPP-WAC, and other requirements documents described above will be accepted for transportation and disposal at WIPP.

  6. WIPP - Passive Institutional Controls (PICs)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The U.S. Department of Energy has developed a program for the development of Passive Institutional Controls to alert future generations to the potential hazards of intersecting the Waste Isolation Pilot Plant (WIPP) repository. These controls are required by U.S. Environmental Protection Agency [Title 40 CFR, Sections 191.14 and 194.43]. The purpose of a passive control, or a PIC, is to indicate the location of the repository and to convey the dangers associated with human exposure to the

  7. Microsoft Word - WIPP_Fact_sheet 3.24.15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Incident at Waste Isolation Pilot Plant by Technical Assessment Team March 2015 Overall Findings On February 14, 2014, an incident in Panel 7 Room 7 (P7R7) of the Waste Isolation Pilot Plant (WIPP) underground repository resulted in the release of radioactive material into the environment and contaminated 21 people with low-level radioactivity. The Technical Assessment Team concluded that one drum, Drum 68660, was the source of radioactive contamination released during the February 14, 2014,

  8. http://www.wipp.ws/TeamWorks/truteamworks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    26/04 Shipments expected for the week of 02/22/04 through 2/28/04: Hanford (2), RFETS (11), SRS (6) A weekly e-newsletter for the Waste Isolation Pilot Plant team February 26, 2004 The Big Story WIPP impacts international Waste Management Symposium Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates.

  9. Waste Isolation Pilot Plant, National Transuranic Program Have Banner Year

    Broader source: Energy.gov (indexed) [DOE]

    in 2013 | Department of Energy Since WIPP became operational in March 1999, it has surpassed receiving 11,000 shipments, which traveled over 14 million safe loaded miles over the nation’s highways through WIPP’s transportation program — equal to about 29 trips around the moon. WIPP has permanently disposed of more than 89,000 cubic meters of TRU waste — enough to fill more than 35 Olympic-size swimming pools. In 2013, WIPP is on course in support of the Los Alamos

  10. Microsoft Word - WIPP Marks A Decade of Safe Disposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Marks a Decade of Safe Disposal CARLSBAD, N.M., March 25, 2009 - The nation's first and only deep geologic repository for the disposal of defense-related transuranic (TRU) radioactive waste has safely operated for more than 10 years. The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) began disposal operations March 26, 1999 and today serves as an international model for radioactive waste management. "What this project has accomplished is remarkable," said DOE

  11. Microsoft Word - DisposalInSaltDifferentThanDisposalInWIPP.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Issues Statement Concerning Debates Over Waste Disposal in Salt CARLSBAD, N.M., July 24, 2009 - The U.S. Department of Energy and its Carlsbad Field Office recognize and respect the long history that led to the current regulations that govern operations at the Waste Isolation Pilot Plant (WIPP). The WIPP is authorized to ship and dispose of transuranic (TRU) waste that was created by U.S. defense programs. TRU waste is a category of waste strictly defined by legislation and legal agreements.

  12. Waste Isolation Pilot Plant site environmental report for calendar year 1990

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Operational Environmental Monitoring Plan (OEMP) monitors a comprehensive set of parameters in order to detect any potential environmental impacts and establish baselines for future quantitative environmental impact evaluations. Surface water and groundwater, soil, and biotics are measured for background radiation. Nonradiological environmental monitoring activities include meteorological, air quality, soil properties, and the status of the local biological community. Ecological studies focus on the immediate area surrounding the site with emphasis on the salt storage pile, whereas baseline radiological surveillance covers a broader geographic area including nearby ranches, villages, and cities. Since the WIPP is still in a preoperational state, no waste has been received; therefore, certain elements required by Order DOE 5400.1 are not presented in this report. 15 figs. 19 tabs.

  13. Microsoft Word - WIPP9000.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C I T u th Z m w A a o S U.S. D Carls Waste P.O. B Carls CARLSBA Isolation P Tuesday e up the lega "This he defense Ziemianski. manner tha The 9 waste, arri Advanced accounts f Since of defense Site, the R Department bad Field Of e Isolation P Box 3090 bad, New M AD, N.M., O Pilot Plant ( evening, m acy of the s significan e legacy T . "The WIP at is protec 9,000 th shi ved at WIP Mixed Wa for nearly h e 1999, W e-related T Rocky Flats of Energy ffice Pilot Plant Mexico 88221 Fo WIPP r

  14. Waste Isolation Pilot Plant Transportation Security

    Office of Environmental Management (EM)

    WIPP Transportation Security Gregory M. Sahd Security Manager Carlsbad Field Office U.S. Department of Energy Contact Information Gregory M. Sahd Security Operations Carlsbad Field Office * U.S. Department of Energy 575.234.8117 * Greg.Sahd@wipp.ws WIPP Transportation "...The (WIPP transportation) system is safer than that employed for any other hazardous material in the U.S...." - National Academy of Sciences, WIPP Panel Hanford Idaho National Engineering and Environmental Laboratory

  15. WIPP Opportunities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Careers at WIPP How to apply for a job at WIPP CBFO Procurement All the information you need to provide goods and/or services to CBFO NWP Procurement All the information you need to provide goods and/or services to NWP Science@WIPP WIPP is available to scientists for conducting unique underground research Small Business/ Small Disadvantaged Business For more information about contract opportunities with the U.S. Department of Energy, see the following publications: Doing Business with the U.S.

  16. Recovery Act Funding Leads to Record Year for Transuranic Waste Shipments

    Broader source: Energy.gov [DOE]

    With the help of American Recovery and Reinvestment Act funding, the Waste Isolation Pilot Plant (WIPP) received the most transuranic waste shipments in a single year since waste operations began...

  17. Radiological Source Term Estimates for the February 14, 2014 WIPP Release

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Event | Department of Energy Radiological Source Term Estimates for the February 14, 2014 WIPP Release Event Radiological Source Term Estimates for the February 14, 2014 WIPP Release Event This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. The Technical Assessment Team (TAT) has undertaken a deliberative investigation process to understand

  18. Draft News Release: DOE Investigates Shipment of Wrong Drum to WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOR IMMEDIATE RELEASE July 19, 2007 Contact: Rick Dale AMWTP Communications 1.208.557.6552 daler@amwtp.inl.gov BBWI Sends Non-Certified Drum To WIPP Bechtel BWXT Idaho (BBWI) has informed the U.S. Department of Energy (DOE) that they shipped a non-certified drum containing transuranic waste to the Waste Isolation Pilot Plant (WIPP), the Department's nuclear waste repository near Carlsbad, N.M. BBWI operates DOE's Advanced Mixed Waste Treatment Facility, located at the DOE's Idaho site, and

  19. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Transmittal of the Recertification Audit Report for the Advanced Mixed Waste Treatment Project, Audit A-10-24, dated December 14, 2010 Transmittal of Carlsbad Field Office Final Audit Report A-10-23, Argonne National Laboratory Central Characterization Project for Remote Handled Waste Characterization dated October 14, 2010 Transmittal of Recertification Audit Report

  20. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Notification of Panel 6 Closure and Final Waste Emplacement dated November 5, 2013 Submittal of Final Audit Reports Transmittal of the Final Audit Report for Recertification Audit A-14-01 of the Advanced Mixed Waste Treatment Project dated December 9, 2013 Final Audit Report for the Argonne National Laboratory Central Characterization Program Recertification Audit A-13-24 dated November 22, 2013

  1. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 2, Technical basis

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    Before disposing of transuranic radioactive waste in the Waste Isolation Pilot Plant (WIPP), the United States Department of Energy (DOE) must evaluate compliance with applicable long-term regulations of the United States Environmental Protection Agency (EPA). Sandia National Laboratories is conducting iterative performance assessments (PAs) of the WIPP for the DOE to provide interim guidance while preparing for a final compliance evaluation. This volume, Volume 2, contains the technical basis for the 1992 PA. Specifically, it describes the conceptual basis for consequence modeling and the PA methodology, including the selection of scenarios for analysis, the determination of scenario probabilities, and the estimation of scenario consequences using a Monte Carlo technique and a linked system of computational models. Additional information about the 1992 PA is provided in other volumes. Volume I contains an overview of WIPP PA and results of a preliminary comparison with the long-term requirements of the EPA`s Environmental Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR 191, Subpart B). Volume 3 contains the reference data base and values for input parameters used in consequence and probability modeling. Volume 4 contains uncertainty and sensitivity analyses related to the preliminary comparison with 40 CFR 191B. Volume 5 contains uncertainty and sensitivity analyses of gas and brine migration for undisturbed performance. Finally, guidance derived from the entire 1992 PA is presented in Volume 6.

  2. Microsoft Word - NR WIPP TRANSPORT RFP MARCH 30 2011f2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 30, 2011 william.taylor@emcbc.doe.gov DOE Seeks Trucking Services for Transuranic Waste Shipments Cincinnati -- The Department of Energy (DOE) today will issue a Request for Proposals for the continuation of carrier services to transport transuranic waste (TRU) between DOE sites and the Waste Isolation Pilot Plant (WIPP) site, near Carlsbad, New Mexico. The transportation of TRU waste is accomplished by contracted trucking carriers that ship the waste via public highways on custom designed

  3. Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant |

    Office of Environmental Management (EM)

    Department of Energy The documents included in this listing are additional references not included in the Phase 2 Radiological Release at the Waste Isolation Pilot Plant, Attachment F: Bibliography and References report. The documents were examined and used to develop the final report. PDF icon Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant

  4. WIPP contractor receives VPP Legacy of Stars Award 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management and Operating Contractor Recognized for Continuous Safety Performance CARLSBAD, N.M., September 20, 2013 - The U.S. Department of Energy (DOE) recognized Nuclear Waste Partnership LLC (NWP), the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor, with the Voluntary Protection Program (VPP) Legacy of Stars Award in latter August 2013. "Safety is central to everything we do, and achieving this elite designation validates our work and the safety-focused

  5. Microsoft Word - WIPP Update 4_9_15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2015 Initial Closure of Panel 6 Underway WIPP personnel have completed the installation of the metal bulkhead at the entrance of Panel 6. This is the first step in meeting a New Mexico Environment Department (NMED) administrative compliance order to provide initial closure of Panel 6, which holds some of the containers from the waste stream linked to the February 14 radiological release in Panel 7, Room 7. Interim closure further isolates the waste and provides additional protection for

  6. http://www.wipp.ws/TeamWorks/truteamworks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5/04 | Shipments expected for the week of 03/14/04 through 3/20/04: INEEL (4), Hanford (2), RFETS (11), SR A weekly e-newsletter for the Waste Isolation Pilot Plant team March 15, 2004 Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 03/15/04 at 8:59 a.m.)

  7. http://www.wipp.ws/TeamWorks/truteamworks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8/04 | Shipments expected for the week 3/21/04 through 3/27/04: Hanford (2), INEEL (3), RFETS (11), SRS A weekly e-newsletter for the Waste Isolation Pilot Plant team March 18, 2004 The Big Story WIPP personnel overcome evacuation order Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to

  8. Drum Involved in Idaho Incident Not Shippable to WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contacts: Dennis Hurtt U.S. Department of Energy Carlsbad Field Office (505) 234-7327 Susan Scott Washington TRU Solutions LLC (505) 234-7204 (800) 493-9768 http://www.wipp.carlsbad.nm.us U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 DOENews For Immediate Release Drum Involved in Idaho Incident Not Shippable to WIPP CARLSBAD, N.M., August 14, 2003, 4:05 p.m. (MDT) - As communicated by the U.S. Department of Energy, and

  9. CBFO and WIPP Volunteerism Helps Little Ones This Winter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CBFO and WIPP Volunteerism Helps Little Ones This Winter CARLSBAD, N.M., November 25, 2014 -- November's winter chill started early in New Mexico; however, children in the Carlsbad area should be able to keep warm while outdoors thanks in part to the actions of the Department of Energy Carlsbad Field Office (CBFO) and Waste Isolation Pilot Plant (WIPP) team of employees. "This is the third year we've held the 'Karing for Kids Koat Drive,' which is on-going from October through the end of

  10. Microsoft Word - WIPP Water Line _2_ _2_ _2_

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Announces the Transfer of the WIPP Water Line to the City of Carlsbad CARLSBAD, N.M., June 18, 2009-The U.S. Department of Energy announced today that the Carlsbad Field Office will transfer the DOE-owned Waste Isolation Pilot Plant (WIPP) water line to the city of Carlsbad. The move will provide the city with an additional water supply while saving the Department of Energy thousands of dollars. DOE first installed the water line in 1984 to support the ongoing operations of the Department's

  11. Inspection of Environment, Safety, and Health Management at the Waste Isolation Pilot Plant- Volume I, August 2002

    Broader source: Energy.gov [DOE]

    The Secretary of Energy’s Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) in July and August 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. This volume discusses the results of the review of the WIPP ES&H programs. The results of the review of the WIPP emergency management program are discussed in Volume II of this report, and the combined results are discussed in a summary report. As discussed throughout this report, the ISM program at WIPP is generally effective. Although improvements are warranted in some areas, the current programs have contributed to overall effective ES&H performance and a good safety record at WIPP. Section 2 of this volume provides an overall discussion of the results of the review of the WIPP ES&H programs, including positive aspects and weaknesses. Section 3 provides OA’s conclusions regarding the overall effectiveness of CBFO and WTS management of the ES&H programs. Section 4 presents the ratings assigned as a result of this review. Appendix A provides supplemental information, including team composition. Appendix B identifies the specific finding that requires corrective action and follow-up. Appendix C presents the results of the review of selected guiding principles of ISM. Appendix D presents the results of the review of the CBFO and WTS feedback and continuous improvement processes. The results of the review of the application of the core functions of ISM for the selected WIPP activities are discussed in Appendix E.

  12. Enterprise Assessments Review, Waste Isolation Pilot Plant -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 2014 Review of the Waste Isolation Pilot Plant Recovery Plan for Operating Diesel Equipment with Available Underground Airflows. The Office of Nuclear Safety and...

  13. Enterprise Assessments Review, Waste Isolation Pilot Plant -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December, 2014 Review of the Waste Isolation Pilot Plant Conduct of Maintenance Recovery Plan The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department...

  14. Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services

    2003-09-17

    The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED).

  15. Science@WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    At the dawn of discovery ... Science@WIPP The deep geologic repository at WIPP is more than a place to dispose of transuranic (TRU) waste – it’s also a science laboratory. Following the designation of the Department of Energy’s Carlsbad office as a field office in 2000, numerous universities and research institutions across the nation sought to take advantage of WIPP’s strong safety culture, open door policy, and extremely low levels of natural background radiation in the underground. It’s

  16. Microsoft Word - NR DRAFT RFP WIPP M&O APR 1 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 1, 2011 william.taylor@emcbc.doe.gov DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant Cincinnati -- The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP) seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico. The estimated value of the anticipated contract is from $130 to $160 million

  17. Inspection of Emergency Management at the Waste Isolation Pilot Plant- Volume II, August 2002

    Broader source: Energy.gov [DOE]

    The Secretary of Energy’s Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health and emergency management programs at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) in July and August 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. This volume discusses the results of the review of the WIPP emergency management program. The results of the review of the WIPP environment, safety, and health (ES&H) programs are discussed in Volume I of this report, and the combined results are discussed in a summary report. The results of this review indicate that, overall, CBFO and WTS have effectively addressed nearly all of the weaknesses identified during the May 2000 OA emergency management review. Furthermore, as a consequence of that effort, CBFO and WTS have implemented a hazardous material emergency management program that, with few exceptions, meets Departmental expectations for providing a system that protects responders, site workers, and the public in the event of an emergency at WIPP. Section 2 of this volume provides an overall discussion of the results of the review of the WIPP emergency management program, including positive aspects, findings, and other items requiring management attention. Section 3 provides OA’s conclusions regarding the overall effectiveness of CBFO and WTS management of the emergency management program. Section 4 presents the ratings assigned as a result of this review. Appendix A provides supplemental information, including team composition. Appendix B identifies the findings that require corrective action and follow-up. Appendices C- F detail the results of the reviews of individual emergency management program elements.

  18. Hanford site transuranic waste certification plan

    SciTech Connect (OSTI)

    GREAGER, T.M.

    1999-05-12

    As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation Pilot Plant (WIPP), the Hanford Site must ensure that its TRU waste meets the requirements of U.S. Department of Energy (DOE) Order 5820.2A, ''Radioactive Waste Management, and the Waste Acceptance Criteria for the Waste Isolation Pilot Plant' (DOE 1996d) (WIPP WAC). The WIPP WAC establishes the specific physical, chemical, radiological, and packaging criteria for acceptance of defense TRU waste shipments at WIPP. The WIPP WAC also requires that participating DOE TRU waste generator/treatment/storage sites produce site-specific documents, including a certification plan, that describe their management of TRU waste and TRU waste shipments before transferring waste to WIPP. The Hanford Site must also ensure that its TRU waste destined for disposal at WIPP meets requirements for transport in the Transuranic Package Transporter41 (TRUPACT-11). The U.S. Nuclear Regulatory Commission (NRC) establishes the TRUPACT-I1 requirements in the ''Safety Analysis Report for the TRUPACT-II Shipping Package'' (NRC 1997) (TRUPACT-I1 SARP).

  19. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Audit Report A-07-16 for INL/CCP RH Waste Characterization Activities dated November 22, 2006 Transmittal of the Certification Audit Report for SRS A-07-01 dated November 21, 2006 Annual Proposed Acceptable Knowledge Sufficiency Determination List Annual Report Submittals Submittal of Acceptable Knowledge Sufficiency Determination Notice of Submittal of a Dispute

  20. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Transmittal of the Certification Audit Report for the Advanced Mixed Waste Treatment Program, A-08-19 dated November 25, 2008 Transmittal of the Certification Audit Report for the Hanford TRU Program dated October 15, 2008 Transmittal of the Certification Audit Report for the Argonne National Laboratory-Central Characterization Project, Audit A-08-24 dated September 17,

  1. Statement of Vernon Daub, Acting Manager of DOEs Carlsbad Field Office, Regarding New Mexico Environment Departments Issuance of a Draft Hazardous Waste Facility Permit for WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Immediate Release Statement of Vernon Daub, Acting Manager of DOE's Carlsbad Field Office, Regarding New Mexico Environment Department's Issuance of a Draft Hazardous Waste Facility Permit for WIPP Carlsbad, New Mexico, November 23, 2005 - "The draft hazardous waste facility permit issued today by the New Mexico Environment Department is a significant step toward fulfilling the mission of WIPP. We very much appreciate the focused, hard work by the NMED staff and senior management. DOE

  2. Microsoft Word - 2014 3-19 FINAL WIPP News Release - WCS Shipments Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact: Donavan Mager, Manager NWP Communication (575) 234-7586 www.nwp-wipp.com DOE, NWP Making Plans to Continue Moving LANL Transuranic Waste Proposal Would Assist DOE in Meeting Commitment to New Mexico CARLSBAD, N.M., March 20, 2014 - Nuclear Waste Partnership (NWP), the management and operating contractor at the Waste Isolation Pilot Plant, in coordination with the U.S. Department of Energy (DOE), is proposing to ship transuranic waste currently located at the Los Alamos National

  3. An introduction to the mechanics of performance assessment using examples of calculations done for the Waste Isolation Pilot Plant between 1990 and 1992

    SciTech Connect (OSTI)

    Rechard, R.P.

    1995-10-01

    This document provides an overview of the process used to assess the performance of the Waste Isolation Pilot Plant (WIPP), a proposed repository for transuranic wastes that is located in southeastern New Mexico. The quantitative metrics used in the performance-assessment (PA) process are those put forward in the Environmental Protection Agency`s Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive flasks (40 CFR 191). Much has been written about the individual building blocks that comprise the foundation of PA theory and practice, and that WIPP literature is well cited herein. However, the present approach is to provide an accurate, well documented overview of the process, from the perspective of the mechanical steps used to perform the actual PA calculations. Specifically, the preliminary stochastic simulations that comprise the WIPP PAs of 1990, 1991. and 1992 are summarized.

  4. Waste Isolation PIlot Plant Geotechnical Analysis Report for July 2005 - June 2006, Volume 1

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2006-04-03

    This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2005, to June 30, 2006. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and borehole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

  5. Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2004 - June 2005, Volume 1

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2006-04-03

    This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since the completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2004, to June 30, 2005. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the Geomechanical Monitoring Program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and borehole observations. Chapter 8 summarizes the results of the geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists the references and bibliography.

  6. New Fact Sheet Highlights Waste Isolation Pilot Plant Recovery...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workers lift a waste box from a TruPact II container at the Waste Isolation Pilot Plant. Workers lift a waste box from a TruPact II container at the Waste Isolation Pilot Plant. ...

  7. Enforcement Letter, Westinghouse Waste Isolation Division- October 3, 2000

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Waste Isolation Division related to Quality Assurance and Occupational Radiation Protection Noncompliances at the Waste Isolation Pilot Plant

  8. Oak Ridge National Laboratory Analysis of Waste Isolation Pilot...

    Office of Environmental Management (EM)

    Ridge National Laboratory Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report Oak Ridge National Laboratory Analysis of Waste Isolation Pilot Plant Samples:...

  9. Performance Assessment Updates for Waste Isolation Pilot Plant...

    Office of Environmental Management (EM)

    Updates for Waste Isolation Pilot Plant Recertification Performance Assessment Updates for Waste Isolation Pilot Plant Recertification R. Chris Camphouse Sandia National...

  10. Independent Oversight Review, Waste Isolation Pilot Plant - April...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 April 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities The...

  11. Voluntary Protection Program Onsite Review, Waste Isolation Pilot...

    Office of Environmental Management (EM)

    March 2009 Voluntary Protection Program Onsite Review, Waste Isolation Pilot Plant - March 2009 March 2009 Evaluation to determine whether the Waste Isolation Pilot Plant is...

  12. Voluntary Protection Program Onsite Review, Waste Isolation Pilot...

    Office of Environmental Management (EM)

    January 2013 Voluntary Protection Program Onsite Review, Waste Isolation Pilot Plant - January 2013 January 2013 Evaluation to determine whether the Waste Isolation Pilot Plant is...

  13. Waste Isolation Pilot Plant Update | Department of Energy

    Office of Environmental Management (EM)

    Update Waste Isolation Pilot Plant Update PDF icon Waste Isolation Pilot Plant Update More Documents & Publications Transuranic Package Transporter (TRUPACT-III) Content Codes...

  14. Deputy Secretary Sherwood-Randall Visits Waste Isolation Pilot...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Visits Waste Isolation Pilot Plant to Survey Recovery Progress, Support Stakeholders and Employees Deputy Secretary Sherwood-Randall Visits Waste Isolation Pilot Plant...

  15. Microsoft Word - NR WIPP TECH ASSISTANCE RFQ MAY 3 2010.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Seeks Technical Assistance Contractor at New Mexico Waste Isolation Pilot Plant Cincinnati -- The Department of Energy (DOE) issued a Request for Quotation (RFQ) today for a technical assistance contract to the Carlsbad Field Office and the Waste Isolation Pilot Project (WIPP) in Carlsbad, NM. This acquisition is under a General Services Administration (GSA) Federal Supply Schedule. The Department intends to award a single task order with a three-year performance period with options that can

  16. SELECTION OF SURPLUS PLUTONIUM MATERIALS FOR DISPOSITION TO WIPP

    SciTech Connect (OSTI)

    Allender, J.; Mcclard, J.; Christopher, J.

    2012-06-08

    The U.S. Department of Energy (DOE) is preparing a Surplus Plutonium Disposition (SPD) Supplemental Environmental Impact Statement (SEIS). Included in the evaluation are up to 6 metric tons (MT) of plutonium in the form of impure oxides and metals for which a disposition plan has not been decided, among options that include preparation as feed for the Mixed Oxide Fuel Fabrication Facility; disposing to high-level waste through the Savannah River Site (SRS) HB Line and H Canyon; can-in-canister disposal using the SRS Defense Waste Processing Facility; and preparation for disposal at the Waste Isolation Pilot Plant (WIPP). DOE and SRS have identified at least 0.5 MT of plutonium that, because of high levels of chemical and isotopic impurities, is impractical for disposition by methods other than the WIPP pathway. Characteristics of these items and the disposition strategy are discussed.

  17. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Final Audit Report for the Argonne National Laboratory Central Characterization Project Recertification Audit A-12-16 dated December 19, 2012 Transmittal of the Final Audit Report for Recertification Audit A-12-14, INL Analytical Laboratories Utilizing the Central Characterization Project dated December 12, 2012 Transmittal of the Final Audit Report for Los Alamos

  18. WIPP Home Page header

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | News & Information | Document Center | Transportation | Opportunities | Contacts | Links | Search WWIS Public Inquiry Page Welcome to the WWIS Public Inquiry Page. This service is established in accordance an Agreement between the United States Department of Energy and the New Mexico Environment Department, dated February 11, 2005, Docket Number HWB 04-07 (CO). This service provides a replicate of information stored on the WIPP Waste Information System. Container Data will be available 14

  19. Guidebook for performance assessment parameters used in the Waste Isolation Pilot Plant compliance certification application. Volume 2: Appendices

    SciTech Connect (OSTI)

    Howarth, S.M.; Martell, M.A.; Weiner, R.; Lattier, C.

    1998-06-01

    The Waste Isolation Pilot Plant (WIPP) Compliance Certification Application (CCA) Performance Assessment (PA) Parameter Database and its ties to supporting information evolved over the course of two years. When the CCA was submitted to the Environmental Protection Agency (EPA) in October 1996, information such as identification of parameter value or distribution source was documented using processes established by Sandia National Laboratories WIPP Quality Assurance Procedures. Reviewers later requested additional supporting documentation, links to supporting information, and/or clarification for many parameters. This guidebook is designed to document a pathway through the complex parameter process and help delineate flow paths to supporting information for all WIPP CCA parameters. In addition, this report is an aid for understanding how model parameters used in the WIPP CCA were developed and qualified. To trace the source information for a particular parameter, a dual-route system was established. The first route uses information from the Parameter Records package as it existed when the CCA calculations were run. The second route leads from the EPA Parameter Database to additional supporting information.

  20. CBFO and WIPP Volunteerism Makes a Big Difference This Winter for Little Ones

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – November’s winter chill started early in New Mexico. However, children in the Carlsbad, New Mexico area should be able to keep warm while outdoors thanks in part to the actions of the EM Carlsbad Field Office (CBFO) and Waste Isolation Pilot Plant (WIPP) team of employees.

  1. New Mexico Environment Department Presents WIPP Its Highest Recognition for Environmental Excellence

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M., April 30, 2013 – The U.S. Department of Energy’s (DOE) Waste Isolation Pilot Plant (WIPP) was recognized by the New Mexico Environment Department (NMED) with Green Zia Environmental Leadership Program (GZELP) Gold Level membership for excellence.

  2. DOE Honors WIPP Representative for Cutting Travel Costs, Greenhouse Gas Emissions

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – A representative of the Waste Isolation Pilot Plant (WIPP) near Carlsbad, N.M., on Tuesday received the Secretary of Energy’s Appreciation Award for her efforts to improve sustainability and reduce travel costs and the number of fleet vehicles.

  3. 2011-02 "Accelerating TRU Waste Shipments from Area G to WIPP...

    Broader source: Energy.gov (indexed) [DOE]

    recommendation is to help ensure that the rate of removal of Transuranic Waste from Area G is consistent with the completion of milestones in the 2005 Order on Consent. It is hoped...

  4. DOE Announces Preference for Disposal of Hanford Transuranic Tank Waste at WIPP

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. –  Today the U.S. Department of Energy (DOE) announced its preferred alternative to retrieve, treat, package, characterize and certify certain Hanford tank waste for disposal at...

  5. New Mexico Environmental Department (NMED) Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit

    Broader source: Energy.gov [DOE]

    Supporting Technical Document for the Radiological Release Accident Investigation Report (Phase II Report)

  6. Waste Isolation Pilot Plant Transportation Security | Department of Energy

    Office of Environmental Management (EM)

    Transportation Security Waste Isolation Pilot Plant Transportation Security PDF icon Waste Isolation Pilot Plant Transportation Security More Documents & Publications Accident Investigation of the February 5, 2014, Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant, Carlsbad NM Accident Investigation Report - Fire Report Fire Hazard Analysis of the Waste Isolation Pilot Plant

  7. Compliance with Waste Acceptance Criteria of WIPP and NTS for Vitrified Low-Level and TRU Waste Forms

    SciTech Connect (OSTI)

    Harbour, J.R.; Andrews, M.K.

    1998-07-01

    A joint project between the Oak Ridge National Laboratory (ORNL) and the Savannah River Technology Center (SRTC) has been established to evaluate vitrification as an option for the immobilization of waste within ORNL tank farms. This paper presents details of calculations based on current best available analyses of the Oak Ridge Tanks on the limits for waste loadings imposed by the waste acceptance criteria.

  8. Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization (40 CFR {section} 761.75[c])

    SciTech Connect (OSTI)

    Westinghouse TRU Solutions

    2002-03-19

    This initial report is being submitted pursuant to Title 40 Code of Federal Regulations (CFR) {section} 761.75(c) to request authorization to allow the disposal of transuranic (TRU) wastes containing polychlorinated biphenyls (PCBs) which are duly regulated under the Toxic Substances Control Act (TSCA). Approval of this initial report will not affect the disposal of TRU or TRU mixed wastes that do not contain PCBs. This initial report also demonstrates how the Waste Isolation Pilot Plant (WIPP) meets or exceeds the technical standards for a Chemical Waste Landfill. Approval of this request will allow the U.S. Department of Energy (DOE) to dispose of approximately 88,000 cubic feet (ft3) (2,500 cubic meters [m3]) of TRU wastes containing PCBs subject to regulation under the TSCA. This approval will include only those PCB/TRU wastes, which the TSCA regulations allow for disposal of the PCB component in municipal solid waste facilities or chemical waste landfills (e.g., PCB remediation waste, PC B articles, and bulk PCB product waste). Disposal of TRU waste by the DOE is congressionally mandated in Public Law 102-579 (as amended by the National Defense Authorization Act for Fiscal Year 1997, Pub. L. 104-201, referred to as the WIPP Land Withdrawal Act [LWA]). Portions of the TRU waste inventory contain hazardous waste constituents regulated under 40 CFR Parts 260 through 279, and/or PCBs and PCB Items regulated under 40 CFR Part 761. Therefore, the DOE TRU waste program must address the disposal requirements for these hazardous waste constituents and PCBs. To facilitate the disposal of TRU wastes containing hazardous waste constituents, the owner/operators received a Hazardous Waste Facility Permit (HWFP) from the New Mexico Environment Department (NMED) on October 27, 1999. The permit allows the disposal of TRU wastes subject to hazardous waste disposal requirements (TRU mixed waste). Informational copies of this permit and other referenced documents are available from the WIPP website. To facilitate the disposal of TRU wastes containing PCBs, the owner/operators are hereby submitting this initial report containing information required pursuant to the Chemical Waste Landfill Approval requirements in 40 CFR {section} 761.75(c). Although WIPP is defined as a miscellaneous unit and not a landfill by the New Mexico Hazardous Waste Act, WIPP meets or exceeds all applicable technical standards for chemical waste landfills by virtue of its design and programs as indicated in the Engineering Report (Attachment B). The layout of this initial report is consistent with requirements (i.e., Sections 2.0 through 12.0 following the sequence of 40 CFR {section} 761.75[c][i] -[ix] with sections added to discuss the Contingency and Training Plans; and Attachment B of this initial report addresses the requirements of 40 CFR {section} 761.75[b][1] through [9] in this order). This initial report includes a description of three proposed changes that will be subject to ''conditional approval.'' The first will allow the disposal of remote-handled (RH) PCB/TRU waste at WIPP. The second will allow the establishment of a central confirmation facility at WIPP. The third will allow for an increase in contact-handled Working Copy Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization DOE/WIPP 02-3196 (CH) waste storage capacities. These proposed changes are discussed further in Section 3.3 of this initial report. ''Conditional approval'' of these requests would allow these activities at WIPP contingent upon: - Approval of the HWFP modification (NMED) and Compliance Certification Application (CCA) change request (Environmental Protection Agency [EPA]) - Inspection of facility prior to implementing the change (if deemed necessary by the EPA) - Written approval from the EPA This initial report also includes the following three requests for waivers to the technical requirements for Chemical Waste Landfills pursuant to 40 CFR {section} 761.75(c)(4): - Hydrologic Conditions (40 CFR {section} 761.75[b][3]) - Monitoring Systems (40 CFR {sect

  9. Nuclear waste isolation activities report

    SciTech Connect (OSTI)

    1980-12-01

    Included are: a report from the Deputy Assistant Secretary, a summary of recent events, new literature, a list of upcoming waste management meetings, and background information on DOE`s radwaste management programs. (DLC)

  10. WIPP Status Update | Department of Energy

    Office of Environmental Management (EM)

    Status Update WIPP Status Update Presentation made by Bill Mackie for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY. PDF icon WIPP Status Update More Documents & Publications EIS-0026-SA-08: Supplemental Analysis Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH TRAMPAC) Central Characterization Program (CCP) Transuranic Authorized Methods for Payload Control

  11. Office of Environmental Management Taps Small Business for Waste Isolation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pilot Plant Contract | Department of Energy Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract Office of Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract August 29, 2012 - 4:54pm Addthis A stratigraph of the Waste Isolation Pilot Plant's underground layers, where Transuranic waste is safely stored. A stratigraph of the Waste Isolation Pilot Plant's underground layers, where Transuranic waste is safely stored. John Hale

  12. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2007 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Transmittal of the Certification Audit Report A-07-14 of the AMWTP dated September 27, 2007 Transmittal of the Certification Audit Report A-07-03 of the ANL-CCP dated September 18, 2007 Final Audit Report A-07-24 of the SRS-CCP Battelle Columbus RH Waste dated September 6, 2007 Transmittal of the Certification Audit Report for the Hanford Site, Audit A-07-10 dated

  13. U.S. Department of Energy Carlsbad Field Office Waste Isolation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the 10-year WIPP Hazardous Waste Facility Permit Renewal. He has also served in an acting role as the Director of the Office of Site Operations and Director of the National TRU...

  14. EIS-0026-S2: Waste Isolation Pilot Plant Disposal Phase, Carlsbad, New Mexico

    Broader source: Energy.gov [DOE]

    SEIS-II evaluates environmental impacts resulting from the various treatment options; the transportation of TRU waste to WIPP using truck, a combination of truck and regular rail service, and a...

  15. Microsoft Word - WIPP Update 9_30_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 30, 2014 U.S. Department of Energy releases WIPP recovery plan Today the U.S. Department of Energy (DOE) released the WIPP Recovery Plan, which outlines the key activities, management approach and strategies that will be used to meet the current goal of resuming operations by the first quarter of calendar year 2016. The plan also includes the projected schedule and costs associated with resumption of waste emplacement at WIPP. The Department is committed to resuming WIPP operations as

  16. A select bibliography with abstracts of reports related to Waste Isolation Pilot Plant geotechnical studies (1972--1990)

    SciTech Connect (OSTI)

    Powers, D.W.; Martin, M.L.

    1993-08-01

    This select bibliography contains 941 entries. Each bibliographic entry contains the citation of a report, conference paper, or journal article containing geotechnical information about the Waste Isolation Pilot Plant (WIPP). The entries cover the period from 1972, when investigation began for a WIPP Site in southeastern New Mexico, through December 1990. Each entry is followed by an abstract. If an abstract or suitable summary existed, it has been included; 316 abstracts were written for other documents. For some entries, an annotation has been provided to clarify the abstract, comment on the setting and significance of the document, or guide the reader to related reports. An index of key words/phrases is included for all entries.

  17. WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 News Releases October 29 WIPP Environmental Initiatives Earn DOE Recognition Click on photo below for larger image. October 24 WIPP Security Contractor Receives DOE Voluntary...

  18. Microbial Gas Generation Under Expected Waste Isolation Pilot Plant Repository Conditions: Final Report

    SciTech Connect (OSTI)

    Gillow, J.B.; Francis, A.

    2011-07-01

    Gas generation from the microbial degradation of the organic constituents of transuranic (TRU) waste under conditions expected in the Waste Isolation Pilot Plant (WIPP) was investigated. The biodegradation of mixed cellulosic materials and electron-beam irradiated plastic and rubber materials (polyethylene, polyvinylchloride, hypalon, leaded hypalon, and neoprene) was examined. We evaluated the effects of environmental variables such as initial atmosphere (air or nitrogen), water content (humid ({approx}70% relative humidity, RH) and brine inundated), and nutrient amendments (nitogen phosphate, yeast extract, and excess nitrate) on microbial gas generation. Total gas production was determined by pressure measurement and carbon dioxide (CO{sub 2}) and methane (CH{sub 4}) were analyzed by gas chromatography; cellulose degradation products in solution were analyzed by high-performance liquid chromatography. Microbial populations in the samples were determined by direct microscopy and molecular analysis. The results of this work are summarized.

  19. Waste Isolation Pilot Plant Nitrate Salt Bearing Waste Container

    Office of Environmental Management (EM)

    Nitrate Salt Bearing Waste Container Isolation Plan Prepared in Response to New Mexico Environment Department Administrative Order 05-20001 Issued May 20, 2014 1.0 INTRODUCTION The purpose of this document is to provide the Plan required by the New Mexico Environment Department (NMED) Administrative Order 05-20001 (Order) issued on May 20, 2014 to the U. S. Department of Energy (DOE) and Nuclear Waste Partnership LLC (NWP), collectively referred to as the Permittees. The Order, at paragraph 22,

  20. 2014 WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Transmittal of the Final Audit Report for Recertification Audit A-15-01 of the Advanced Mixed Waste Treatment Project dated November 25, 2014 Transmittal of the Final Audit Report for CBFO Audit A-14-26, SNL/CCP TRU Waste Characterization and Certification Activities dated November 18, 2014 Transmittal of the Final Audit Report for ANL/CCP Recertification Audit A-14-20

  1. Certification document for newly generated contact-handled transuranic waste

    SciTech Connect (OSTI)

    Box, W.D.; Setaro, J.

    1984-01-01

    The US Department of Energy has requested that all national laboratories handling defense waste develop and augment a program whereby all newly generated contact-handled transuranic (TRU) waste be contained, stored, and then shipped to the Waste Isolation Pilot Plant (WIPP) in accordance with the requirements set forth in WIPP-DOE-114. The program described in this report delineates how Oak Ridge National Laboratory intends to comply with these requirements and lists the procedures used by each generator to ensure that their TRU wastes are certifiable for shipment to WIPP.

  2. DRSPALL: Impact of the Modification of the Numerical Spallings Model on Waste Isolation Pilot Plant Performance Assessment.

    SciTech Connect (OSTI)

    Kicker, Dwayne Curtis; Herrick, Courtney G.; Zeitler, Todd; Malama, Bwalya; Rudeen, David Keith; Gilkey, Amy P.

    2016-01-01

    The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant (WIPP) solid waste subject to material failure and transport to the surface as a result of a hypothetical future inadvertent drilling intrusion. An error in the implementation of the DRSPALL finite difference equations was discovered as documented in Software Problem Report (SPR) 13-001. The modifications to DRSPALL to correct the finite difference equations are detailed, and verification and validation testing has been completed for the modified DRSPALL code. The complementary cumulative distribution function (CCDF) of spallings releases obtained using the modified DRSPALL is higher compared to that found in previous WIPP performance assessment (PA) calculations. Compared to previous PAs, there was an increase in the number of vectors that result in a nonzero spallings volume, which generally translates to an increase in spallings releases. The overall mean CCDFs for total releases using the modified DRSPALL are virtually unchanged, thus the modification to DRSPALL did not impact WIPP PA calculation results.

  3. Independent Oversight Review, Waste Isolation Pilot Plant - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    November 2012 Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste...

  4. WIPP Update 5_09_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to the magnesium oxide bags. The WIPP team is evaluating the contents of a set of waste drums that came from Los Alamos National Laboratory that are located in Panel 7, the...

  5. Assessment of potential doses to workers during postulated accident conditions at the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Hoover, M.D.; Newton, G.J.; Farrell, R.F.

    1996-06-01

    This qualitative hazard evaluation systematically assessed potential doses to workers during postulated accident conditions at the U.S. Department of Energy`s Waste Isolation Pilot Plant (WIPP). Postulated accidents included the spontaneous ignition of a waste drum, puncture of a waste drum by a forklift, dropping of a waste drum from a forklift, and simultaneous dropping of seven drums during a crane failure. The descriptions and estimated frequencies of occurrence for these accidents were developed by the Hazard and Operability Study for CH TRU Waste Handling System (WCAP 14312). The estimated materials at risk, damage ratios, airborne release fractions and respirable fractions for these accidents were taken from the 1995 Safety Analysis Report (SAR) update and from the DOE handbook Airborne Release Fractions/Rates and Respirable Fractions for Nonreactor Nuclear Facilities (DOE-HDBK-3010-94). A Monte Carlo simulation was used to estimate the range of worker exposures that could result from each accident. Guidelines for evaluating the adequacy of defense-in-depth for worker protection at WIPP were adopted from a scheme presented by the International Commission on Radiological Protection in its publication on Protection from Potential Exposure: A Conceptual Framework (ICRP Publication 64). Probabilities of exposures greater than 5, 50, and 300 rem were less than 10{sup -2}, 10{sup -4}, and 10{sup -6} per year, respectively. In conformance with the guidance of DOE standard 3009-94, Appendix A (draft), we emphasize that use of these evaluation guidelines is not intended to imply that these numbers constitute acceptable limits for worker exposure under accident conditions. However, in conjunction with the extensive safety assessment in the 1995 SAR update, these results indicate that the Carlsbad Area Office strategy for the assessment of hazards and accidents assures the protection of workers, as well as members of the public and the environment.

  6. Geological problems in radioactive waste isolation

    SciTech Connect (OSTI)

    Witherspoon, P.A.

    1991-01-01

    The problem of isolating radioactive wastes from the biosphere presents specialists in the fields of earth sciences with some of the most complicated problems they have ever encountered. This is especially true for high level waste (HLW) which must be isolated in the underground and away from the biosphere for thousands of years. Essentially every country that is generating electricity in nuclear power plants is faced with the problem of isolating the radioactive wastes that are produced. The general consensus is that this can be accomplished by selecting an appropriate geologic setting and carefully designing the rock repository. Much new technology is being developed to solve the problems that have been raised and there is a continuing need to publish the results of new developments for the benefit of all concerned. The 28th International Geologic Congress that was held July 9--19, 1989 in Washington, DC provided an opportunity for earth scientists to gather for detailed discussions on these problems. Workshop W3B on the subject, Geological Problems in Radioactive Waste Isolation -- A World Wide Review'' was organized by Paul A Witherspoon and Ghislain de Marsily and convened July 15--16, 1989 Reports from 19 countries have been gathered for this publication. Individual papers have been cataloged separately.

  7. 2016 WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Transmittal of Final Audit Report for Recertification Audit A-16-02 of the Savannah River Site Central Characterization Program dated February 29, 2016 Annual Proposed Acceptable Knowledge Sufficiency Determination List Annual Report Submittals

  8. Best Seller Cites Westinghouse Safety Culture at WIPP as "World-Wide Standard"

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Best Seller Cites Westinghouse Safety Culture at WIPP As "World-Wide Standard" CARLSBAD, N.M., October 23, 2001 -- A best-selling business book recognizes the safety culture created by Westinghouse at the U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico, as "the worldwide standard for safety practices." The book, originally published by Linkage Press of Lexington, Massachusetts, as Linkage Inc.'s Best Practices in Organization

  9. DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEWS MEDIA CONTACT: FOR IMMEDIATE RELEASE Joe Davis, 202/586-4940 Tuesday, January 18, 2004 DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP WASHINGTON, DC - The U.S. Department of Energy (DOE) announced today that it has decided to exercise the five year option in the Washington TRU Solutions LLC ("WTS") contract to continue managing and operating the Department's Waste Isolation Pilot Plant (WIPP), located in New Mexico. The option DOE exercised is a

  10. DOE to host workshop to explore use of WIPP as 'next generation' underground laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Workshop to Explore Use of WIPP As 'Next Generation' Underground Laboratory CARLSBAD, N.M., June 9, 2000 - The U.S. Department of Energy's (DOE) Carlsbad Area Office is sponsoring the "Workshop on the Next Generation U.S. Underground Science Facility" June 12-14 at the Pecos River Village Conference Center, 711 Muscatel, in Carlsbad. The purpose of the workshop is to explore the potential use of the DOE's Waste Isolation Pilot Plant (WIPP) underground as a next generation laboratory

  11. WIPP Home Page Search

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home Page Search Enter word(s) to search for on the WIPP Home Page: Search

  12. Panelists Update Workshop Participants on Waste Isolation Pilot...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    speaks at the workshop as a member of a panel on the Waste Isolation Pilot Plant recovery. ... speaks at the workshop as a member of a panel on the Waste Isolation Pilot Plant recovery. ...

  13. WIPP UPDATE: June 2, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2014 Samples collected from WIPP underground On May 30, an entry team collected several samples from the WIPP underground, as part of the ongoing effort to determine the cause of the drum breach. Collections include magnesium oxide (MgO) samples taken near the breached drum in Room 7, Panel 7, and a sample of material believed to have originated from the breached drum. Additional MgO samples were also taken from various locations around the waste stacks. Workers also took video in in Room 7,

  14. PROBABILISTIC SAFETY ASSESSMENT OF OPERATIONAL ACCIDENTS AT THE WASTE ISOLATION PILOT PLANT

    SciTech Connect (OSTI)

    Rucker, D.F.

    2000-09-01

    This report presents a probabilistic safety assessment of radioactive doses as consequences from accident scenarios to complement the deterministic assessment presented in the Waste Isolation Pilot Plant (WIPP) Safety Analysis Report (SAR). The International Council of Radiation Protection (ICRP) recommends both assessments be conducted to ensure that ''an adequate level of safety has been achieved and that no major contributors to risk are overlooked'' (ICRP 1993). To that end, the probabilistic assessment for the WIPP accident scenarios addresses the wide range of assumptions, e.g. the range of values representing the radioactive source of an accident, that could possibly have been overlooked by the SAR. Routine releases of radionuclides from the WIPP repository to the environment during the waste emplacement operations are expected to be essentially zero. In contrast, potential accidental releases from postulated accident scenarios during waste handling and emplacement could be substantial, which necessitates the need for radiological air monitoring and confinement barriers (DOE 1999). The WIPP Safety Analysis Report (SAR) calculated doses from accidental releases to the on-site (at 100 m from the source) and off-site (at the Exclusive Use Boundary and Site Boundary) public by a deterministic approach. This approach, as demonstrated in the SAR, uses single-point values of key parameters to assess the 50-year, whole-body committed effective dose equivalent (CEDE). The basic assumptions used in the SAR to formulate the CEDE are retained for this report's probabilistic assessment. However, for the probabilistic assessment, single-point parameter values were replaced with probability density functions (PDF) and were sampled over an expected range. Monte Carlo simulations were run, in which 10,000 iterations were performed by randomly selecting one value for each parameter and calculating the dose. Statistical information was then derived from the 10,000 iteration batch, which included 5%, 50%, and 95% dose likelihood, and the sensitivity of each assumption to the calculated doses. As one would intuitively expect, the doses from the probabilistic assessment for most scenarios were found to be much less than the deterministic assessment. The lower dose of the probabilistic assessment can be attributed to a ''smearing'' of values from the high and low end of the PDF spectrum of the various input parameters. The analysis also found a potential weakness in the deterministic analysis used in the SAR, a detail on drum loading was not taken into consideration. Waste emplacement operations thus far have handled drums from each shipment as a single unit, i.e. drums from each shipment are kept together. Shipments typically come from a single waste stream, and therefore the curie loading of each drum can be considered nearly identical to that of its neighbor. Calculations show that if there are large numbers of drums used in the accident scenario assessment, e.g. 28 drums in the waste hoist failure scenario (CH5), then the probabilistic dose assessment calculations will diverge from the deterministically determined doses. As it is currently calculated, the deterministic dose assessment assumes one drum loaded to the maximum allowable (80 PE-Ci), and the remaining are 10% of the maximum. The effective average of drum curie content is therefore less in the deterministic assessment than the probabilistic assessment for a large number of drums. EEG recommends that the WIPP SAR calculations be revisited and updated to include a probabilistic safety assessment.

  15. Enterprise Assessments Review, Waste Isolation Pilot Plant – December 2014

    Broader source: Energy.gov [DOE]

    Review of the Waste Isolation Pilot Plant Recovery Plan for Operating Diesel Equipment with Available Underground Airflows

  16. Lab sets new record for waste shipments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New record for waste shipments Lab sets new record for waste shipments LANL completing its 132nd transuranic (TRU) waste shipment of fiscal year 2010 to the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. August 20, 2010 LANL's shipment of transuranic waste leaves Los Alamos. LANL's shipment of transuranic waste leaves Los Alamos. Contact Fred deSousa Communications Office (505) 500-5672 Email "Removing this waste from Los Alamos is crucial to our plans for overall

  17. Waste Isolation Pilot Plant Activites | Department of Energy

    Office of Environmental Management (EM)

    Waste Isolation Pilot Plant Activites Waste Isolation Pilot Plant Activites PDF icon Waste Isolation Pilot Plant Activites More Documents & Publications EIS-0026: 2010 Annual Mitigation Report EIS-0026: Annual Mitigation Report Table 2: U.S. Geographic Areas and Census Regions

  18. Microsoft Word - WIPP Update 2_12_15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Reach's 90-foot boom is positioned over the top of waste containers in Panel 7, Room 7, as a remotely operated video camera collects photographic evidence. WIPP UPDATE: February 12, 2015 AIB: No Additional Breached Containers Contributed to WIPP Radiological Release Initial analysis of the photographic data obtained by Project Reach indicates that no additional breached waste containers contributed to the February 14, 2014, radiological event at WIPP. According to Ted Wyka, chairman of

  19. Porosity, single-phase permeability, and capillary pressure data from preliminary laboratory experiments on selected samples from Marker Bed 139 at the Waste Isolation Pilot Plant. Volume 1 of 3: Main report, appendix A

    SciTech Connect (OSTI)

    Howarth, S.M.; Christian-Frear, T.

    1997-08-01

    Three groups of core samples from Marker Bed 139 of the Salado Formation at the Waste Isolation Pilot Plant (WIPP) were analyzed to provide data to support the development of numerical models used to predict the long-term hydrologic and structural response of the WIPP repository. These laboratory experiments, part of the FY93 Experimental Scoping Activities of the Salado Two-Phase Flow Laboratory Program, were designed to (1) generate WIPP-specific porosity and single-phase permeability data, (2) provide information needed to design and implement planned tests to measure two-phase flow properties, including threshold pressure, capillary pressure, and relative permeability, and (3) evaluate the suitability of using analog correlations for the Salado Formation to assess the long-term performance of the WIPP. This report contains a description of the boreholes core samples, the core preparation techniques used, sample sizes, testing procedures, test conditions, and results of porosity and single-phase permeability tests performed at three laboratories: TerraTek, Inc. (Salt Lake City, UT), RE/SPEC, Inc. (Rapid City, SD), and Core Laboratories-Special Core Analysis Laboratory (Carrollton, TX) for Rock Physics Associates. In addition, this report contains the only WIPP-specific two-phase-flow capillary-pressure data for twelve core samples. The WIPP-specific data generated in this laboratory study and in WIPP field-test programs and information from suitable analogs will form the basis for specification of single- and two-phase flow parameters for anhydrite markers beds for WIPP performance assessment calculations.

  20. Waste Isolation Pilot Plant site environmental report, for calendar year 1995

    SciTech Connect (OSTI)

    1996-09-01

    The U.S. Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires DOE facilities, that conduct environmental protection programs, to annually prepare a Site Environmental Report (SER). The purpose of the SER is to provide an abstract of environmental assessments conducted in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit. The content of this SER is not restricted to a synopsis of the required data, in addition, information pertaining to new and continued monitoring and compliance activities during the 1995 calendar year are also included. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP). The EMP provides inclusive guidelines implemented to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater. air, soil, and biotic matrices are monitored for an array of radiological and nonradiological factors. The baseline radiological surveillance program encompasses a broader geographic area that includes nearby ranches, villages, and cities. Most elements of nonradiological assessments are conducted within the geographic vicinity of the WIPP site.

  1. Hydrogeochemical studies of the Rustler Formation and related rocks in the Waste Isolation Pilot Plant Area, Southeastern New Mexico

    SciTech Connect (OSTI)

    Siegel, M.D.; Lambert, S.J.; Robinson, K.L.

    1991-08-01

    Chemical, mineralogical, isotopic, and hydrological studies of the Culebra dolomite member of the Rustler Formation and related rocks are used to delineate hydrochemical facies and form the basis for a conceptual model for post-Pleistocene groundwater flow and chemical evolution. Modern flow within the Culebra in the Waste Isolation Pilot Plant (WIPP) area appears to be largely north-to-south; however, these flow directions under confined conditions are not consistent with the salinity distribution in the region surrounding the WIPP Site. Isotopic, mineralogical, and hydrological data suggest that vertical recharge to the Culebra in the WIPP area and to the immediate east and south has not occurred for several thousand years. Eastward increasing {sup 234}U/{sup 238}U activity ratios suggest recharge from a near-surface Pleistocene infiltration zone flowing from the west-northwest and imply a change in flow direction in the last 30,000 to 12,000 years. 49 refs., 34 figs., 4 tabs.

  2. Transuranic Waste Characterization Quality Assurance Program Plan

    SciTech Connect (OSTI)

    NONE

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  3. First Oak Ridge Remote-Handled Transuranic Waste Shipment Arrives Safely at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WIPP | Department of Energy First Oak Ridge Remote-Handled Transuranic Waste Shipment Arrives Safely at WIPP First Oak Ridge Remote-Handled Transuranic Waste Shipment Arrives Safely at WIPP March 2, 2009 - 12:00pm Addthis OAK RIDGE, Tenn. - The U.S. Department of Energy (DOE) achieved a major environmental cleanup milestone this week with the first shipment of Remote-Handled Transuranic (TRU) Waste leaving DOE's Oak Ridge Reservation and arriving safely at the Waste Isolation Pilot Plant

  4. WIPP Information Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP milestones are noted on banners at the WIPP Experience Exhibit at the Skeen-Whitlock Building in Carlsbad. The WIPP Experience Exhibit at 4021 National Parks Highway in Carlsbad, N.M. WIPP Information Center Address: 4021 National Parks Highway Carlsbad, NM 88220 Toll-free telephone number: 1-800-336-WIPP (9477) E-mail inquiries are welcomed For emergency contact information, please refer to the Joint Information Center page. Media Contacts Tim Runyon U.S. Department of Energy WIPP Recovery

  5. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    List Annual Report Submittals Transmittal of Waste Isolation Pilot Plant Annual Geotechnical Analysis Report dated October 30, 2015 Submittal of Acceptable Knowledge...

  6. WIPP Compliance Certification Application calculations parameters. Part 2: Parameter documentation

    SciTech Connect (OSTI)

    Howarth, S.M.

    1997-11-14

    The Waste Isolation Pilot Plant (WIPP) in southeast New Mexico has been studied as a transuranic waste repository for the past 23 years. During this time, an extensive site characterization, design, construction, and experimental program was completed, which provided in depth understanding of the dominant processes that are most likely to influence the containment of radionuclides for 10,000 years. Nearly 1,500 parameters were developed using information gathered from this program and were input to numerical models for WIPP Compliance Certification Application (CCA) Performance Assessment (PA) calculations. The CCA probability models require input parameters that are defined by a statistical distribution. Developing parameters begins with the assignment of an appropriate distribution type, which is dependent on the type, magnitude, and volume of data or information available. Parameter development may require interpretation or statistical analysis of raw data, combining raw data with literature values, scaling laboratory or field data to fit code grid mesh sizes, or other transformations. Documentation of parameter development is designed to answer two questions: What source information was used to develop this parameter? and Why was this particular data set/information used? Therefore, complete documentation requires integrating information from code sponsors, parameter task leaders, performance assessment analysts, and experimental principal investigators. This paper, Part 2 of 2 parts, contains a discussion of the WIPP CCA PA Parameter Tracking System, document traceability and retrievability, and lessons learned from related audits and reviews.

  7. EEG operational radiation surveillance of the WIPP Project during 2001

    SciTech Connect (OSTI)

    Gray, Donald H.; Ballard, Sally C.; Channell, James K.

    2002-12-31

    The Environmental Evaluation Group (EEG) has measured the levels of 241Am, 238Pu, 239/240Pu, 137Cs, and 90Sr in samples of air and water collected at and in the vicinity of the U. S. Department of Energys (DOE) Waste Isolation Pilot Plant (WIPP) during 2001. The WIPP received the first shipment of waste in March 1999 and became operational at that time. The EEG has compared these levels to those measured in the preoperational phase, prior to receipt of waste, as well as to the results of other monitoring organizations and to the U. S. Environmental Protection Agency (EPA) dose standards established for the WIPP at 40 CFR 191, Subpart A, and, by an agreement between the DOE and the EPA, at 40 CFR 61, Subpart H. Based on these analyses and applying a t test for significant differences for normally-distributed data (Taylor 1987), or analysis of variance (ANOVA) for non-normal data, the EEG concludes that: 1. Three measurements of radionuclides in the environment around WIPP during 2001 were different from the preoperational baseline levels. Only two of these 241Am in both the Loving and WIPP3 low volume air sampler (LVAS) samples, first quarter and second quarter, respectively exceeded the minimum detectable activity (MDA). These measurements were carefully investigated, but no clearly assignable cause was discovered. No measurements of 241Am in effluent air from the WIPP underground exceeded the action level, and converting the highest LVAS measured concentration to radiation dose yielded a committed dose of much less than 1% of the limit allowable under the EPA standard. 2. Comparison of the EEGs 2001 results with those of other monitoring organizations revealed two sets of measurements which did not agree. One set 241Am in surface water was found to be in agreement with the corresponding EEG baseline. The other 90Sr in groundwater was probably a result of 226

  8. WIPP Documents - Environmental Management and Sustainability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management and Sustainability WIPP Environmental Policy DOE/WIPP 04-3310 Rev 5 Environmental Management System Description DOE/WIPP-05-3318 Rev 5 WIPP Site Sustainability Plan DOE/WIPP-14-3542 WIPP Environmental Targets

  9. Characterizing cemented TRU waste for RCRA hazardous constituents

    SciTech Connect (OSTI)

    Yeamans, D.R.; Betts, S.E.; Bodenstein, S.A. [and others

    1996-06-01

    Los Alamos National Laboratory (LANL) has characterized drums of solidified transuranic (TRU) waste from four major waste streams. The data will help the State of New Mexico determine whether or not to issue a no-migration variance of the Waste Isolation Pilot Plant (WIPP) so that WIPP can receive and dispose of waste. The need to characterize TRU waste stored at LANL is driven by two additional factors: (1) the LANL RCRA Waste Analysis Plan for EPA compliant safe storage of hazardous waste; (2) the WIPP Waste Acceptance Criteria (WAC) The LANL characterization program includes headspace gas analysis, radioassay and radiography for all drums and solids sampling on a random selection of drums from each waste stream. Data are presented showing that the only identified non-metal RCRA hazardous component of the waste is methanol.

  10. WIPP News Releases - 1996

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 News Releases DOE to Hold Public Hearings Next Week in Albuquerque on WIPP SEIS - 123196 DOE to Hold Public Hearings Next Week in Santa Fe on WIPP SEIS - 123196 DOE Announces ...

  11. WIPP News Releases - 2005

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 News Releases December 27 Empty WIPP truck overturns December 12 Dr. Dave Moody to Lead the Carlsbad Field Office December 7 WIPP Satellite Tracking System Relocates to Carlsbad...

  12. 2009 WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    09 News Releases December 21 Magnum Minerals to Buy WIPP Salt October 14 Agreement Reached Between WTS and Union Employees October 1 Truck Accident Did Not Involve WIPP Shipment...

  13. WIPP Projects Interative Map

    Broader source: Energy.gov [DOE]

    View WIPP Projects in a larger map. To report corrections, please email WeatherizationInnovation@ee.doe.gov.

  14. WIPP Recovery Information

    Broader source: Energy.gov [DOE]

    At the March 26, 2014 Board meeting J. R. Stroble CBFO, Provided Information on Locations to Access WIPP Recovery Information.

  15. WIPP Documents - Other

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Other Accelerating Cleanup: Paths to Closure The Department of Energy Carlsbad Field Office's proposed approach to cleaning up and closing transuranic waste storage sites. August 2004 Solid Waste Management Report Solid Waste Management Unit Activities from May 1, 2004 through July 31, 2004, August 2004 Quarterly Progress Report The Karst and Related Issues at the Waste Isolation Pilot Plant Dated 6/23/09 Pioneering Nuclear Waste Disposal DOE/CAO-00-3124, Feb. 2000 Documents the 40-plus year

  16. Microsoft Word - FINAL WIPP REPORT-5-6-2015

    Office of Environmental Management (EM)

    Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL) H. M. Ajo F. Fondeur L. W. Brown C. M Gregory C. J. Coleman M. A. Jones S. L. Crump D. M. Missimer C. C. Diprete P. E. O'Rourke D. P. Diprete T. L. White A. A. Ekechukwu J. E. Young December 2014 SRNL-STI-2014-00617 SRNL-STI-2014-00617 Revision 0 ii DISCLAIMER This work was prepared under an agreement with and funded by the U.S. Government. Neither the U.S. Government or its employees,

  17. WIPP Documents - National TRU Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Label 1 Content 1 Label 2 Content 2 Large file size alert This symbol means the document may be a large file size. National TRU Program Annual Transuranic Waste Inventory Report - 2015 DOE/TRU-15-3425 Rev 0 Effective date 12/15 The information presented in the ATWIR - 2015 serves as a current baseline of the TRU waste inventory for potential disposal at WIPP and may be considered in future Compliance Recertification Applications. The TRU Waste Inventory Profile Reports (Appendices A and B)

  18. Microsoft Word - WIPP Update 07_30_15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP UPDATE: July 31, 2015 WIPP Announces Schedule Changes for Resumption of Operations While the WIPP recovery program continues to make significant progress, the original target date of March 2016 for resuming waste emplacement operations is no longer viable due to a variety of unanticipated issues. Over the past several months a number of additional activities have been identified that need to be added to the project schedule, including safety related activities that are required to be

  19. Waste Isolation Pilot Plant land management plan

    SciTech Connect (OSTI)

    1996-05-01

    On October 30, 1992, the WIPP Land Withdrawal Act became law. This Act transferred the responsibility for the management of the WIPP Land Withdrawal Area (WILWA) from the Secretary of the Interior to the Secretary of Energy. In accordance with sections 3(a)(1) and (3) of the Act, these lands {open_quotes}{hor_ellipsis}are withdrawn from all forms of entry, appropriation, and disposal under the public land laws{hor_ellipsis}{close_quotes}and are reserved for the use of the Secretary of Energy {open_quotes}{hor_ellipsis}for the construction, experimentation, operation, repair and maintenance, disposal, shutdown, monitoring, decommissioning, and other activities, associated with the purposes of WIPP as set forth in the Department of Energy National Security and Military Applications of Nuclear Energy Act of 1980 and this Act.{close_quotes}. As a complement to this LMP, a MOU has been executed between the DOE and the BLM, as required by section 4(d) of the Act. The state of New Mexico was consulted in the development of the MOU and the associated Statement of Work (SOW).

  20. WIPP UPDATE: May 28, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    28, 2014 Corrective action plans key for WIPP recovery effort The Accident Investigation Board issued a report in March on the February 5 underground truck fire, which included 22 conclusions and 35 Judgments of Need. The report concluded the fire was the result of flammable fluids - hydraulic fluid or diesel fuel - coming into contact with a hot surface. Judgments of Need are specific issues or concerns that require corrective actions. Nuclear Waste Partnership (NWP) has submitted a Corrective

  1. The Karst and Related Issues at the Waste Isolation Pilot Plant (WIPP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  2. Source Term Analysis for the Waste Isolation Pilot Plant (WIPP) Release Quantity

    Broader source: Energy.gov [DOE]

    Supporting Technical Document for the Radiological Release Accident Investigation Report (Phase II Report)

  3. Panelists Update Workshop Participants on Waste Isolation Pilot Plant

    Office of Environmental Management (EM)

    Recovery | Department of Energy Panelists Update Workshop Participants on Waste Isolation Pilot Plant Recovery Panelists Update Workshop Participants on Waste Isolation Pilot Plant Recovery October 5, 2015 - 12:10pm Addthis EM Acting Associate Principal Deputy Assistant Secretary Frank Marcinowski, far right, speaks at the workshop as a member of a panel on the Waste Isolation Pilot Plant recovery. DOE Idaho Operations Office Deputy Manager Jack Zimmerman, left, and EM Associate Deputy

  4. Oak Ridge National Laboratory Analysis of Waste Isolation Pilot Plant

    Energy Savers [EERE]

    Samples: Integrated Summary Report | Department of Energy National Laboratory Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report Oak Ridge National Laboratory Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. The Technical Assessment Team

  5. Enterprise Assessments Operational Awareness Record, Waste Isolation Pilot

    Office of Environmental Management (EM)

    Plant - March 2015 | Department of Energy Record, Waste Isolation Pilot Plant - March 2015 Enterprise Assessments Operational Awareness Record, Waste Isolation Pilot Plant - March 2015 March 2015 Review of the Waste Isolation Pilot Plant Limited Review of Engineering Configuration Management Processes The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department of Energy's independent Office of Enterprise Assessments (EA), Office of Environment, Safety and Health

  6. Mr. John E. Kieling, Chief Hazardous Waste Bureau

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 2014 New Mexico Environment Department 2905 Rodeo Park Drive East, Building 1 Santa Fe, New Mexico 87505-6303 Subject: Transmittal of the Waste Isolation Pilot Plant Project 2014 Waste Minimization Report, Permit Number NM4890139088-TSDF Dear Mr. Kieling: The purpose of this letter is to provide you with the Waste Isolation Pilot Plant {WIPP) Project 2014 Waste Minimization Report. This report, required by and prepared in accordance with the W IPP Hazardous Waste Facility Permit Part 2,

  7. Waste Isolation Pilot Plant Update for January 2016

    Broader source: Energy.gov [DOE]

    At the January 27, 2016 Board Meeting J.R. Stroble, Carlsbad Field Office, Provided a presentation on the Waste Isolation Pilot Plant Update for January 2016.

  8. Enterprise Assessments Review of Waste Isolation Pilot Plant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Isolation Pilot Plant Engineering and Procurement ... 2 5.1 Engineering Process Review ... RJR Engineering SDD System Design Description SR ...

  9. Waste Isolation Pilot Plant 2002 Site Environmental Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... species, receive special consideration when ... set limits for doses due to radionuclide emissions to air. ... Waste Isolation Pilot Plant 2002 Site Environmental Report ...

  10. WASHINGTON GROUP TEAM WINS NEW CONTRACT TO MANAGE WASTE ISOLATION...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 2000 WASHINGTON GROUP TEAM WINS NEW CONTRACT TO MANAGE WASTE ISOLATION PILOT PLANT IN NEW MEXICO Boise, Idaho-Washington Group International, Inc. (NYSE: WNG), announced today...

  11. Enterprise Assessments Review of Waste Isolation Pilot Plant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pilot Plant Engineering and Procurement Processes - November 2015 Enterprise Assessments Review of Waste Isolation Pilot Plant Engineering and Procurement Processes - November...

  12. Office of Enterprise Assessments Review of the Waste Isolation...

    Office of Environmental Management (EM)

    Waste Isolation Pilot Plant Conduct of Maintenance Recovery Plan December 2014 Office of Nuclear Safety and Environmental Assessments Office of Environment, Safety and Health...

  13. Sandia Energy - Waste Isolation Pilot Plant Accident Investigation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home Energy Nuclear Energy News News & Events Research & Capabilities Systems Analysis Materials Science Computational Modeling & Simulation Waste Isolation Pilot Plant Accident...

  14. DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation

    Office of Environmental Management (EM)

    Pilot Plant Receives 10,000th Shipment | Department of Energy ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment October 3, 2011 - 12:00pm Addthis DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE:

  15. The use of expert elicitation to quantify uncertainty in incomplete sorption data bases for Waste Isolation Pilot Plant performance assessment

    SciTech Connect (OSTI)

    Anderson, D.R.; Trauth, K.M. ); Hora, S.C. )

    1991-01-01

    Iterative, annual performance-assessment calculations are being performed for the Waste Isolation Pilot Plant (WIPP), a planned underground repository in southeastern New Mexico, USA for the disposal of transuranic waste. The performance-assessment calculations estimate the long-term radionuclide releases from the disposal system to the accessible environment. Because direct experimental data in some areas are presently of insufficient quantity to form the basis for the required distributions. Expert judgment was used to estimate the concentrations of specific radionuclides in a brine exiting a repository room or drift as it migrates up an intruding borehole, and also the distribution coefficients that describe the retardation of radionuclides in the overlying Culebra Dolomite. The variables representing these concentrations and coefficients have been shown by 1990 sensitivity analyses to be among the set of parameters making the greatest contribution to the uncertainty in WIPP performance-assessment predictions. Utilizing available information, the experts (one expert panel addressed concentrations and a second panel addressed retardation) developed an understanding of the problem and were formally elicited to obtain probability distributions that characterize the uncertainty in fixed, but unknown, quantities. The probability distributions developed by the experts are being incorporated into the 1991 performance-assessment calculations. 16 refs., 4 tabs.

  16. Petrographic and X-ray diffraction analyses of selected samples from Marker Bed 139 at the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Fredrich, J.T.; Zeuch, D.H.

    1996-04-01

    The Waste Isolation Pilot Plant (WIPP) is located 660 m underground in the Salado Formation which consists of thick, horizontally bedded pure and impure salt and thin, laterally continuous clay and anhydrite interbeds. The Salado Two-Phase Flow Laboratory Program was established to provide site-specific-two-phase flow and other related rock properties to support performance assessment modeling of the WIPP repository. Owing to their potentially significant role in the hydrologic response of the repository, the program initially focused on the anhydrite interbeds, and in particular, on Marker Bed 139 (MB 139), which lies approximately 1 m below the planned waste storage rooms. This report synthesizes petrographic and X-ray powder diffraction studies performed to support the Salado Two-Phase Flow Laboratory Program. Experimental scoping activities in this area were performed in FY 1993 by three independent laboratories in order to: (1) quantify the mineral composition to support laboratory studies of hydrologic properties and facilitate correlation of transport properties with composition; (2) describe textures, including grain size; and (3) describe observed porosity. Samples from various depths were prepared from six 6-inch diameter cores which were obtained by drilling into the marker bed from the floor of two separate rooms. The petrographic analyses are augmented here with additional study of the original thin sections, and the pore structure observations are also examined in relation to an independent observational study of microcracks in Marker Bed 139 core samples performed in FY 1994 by the Geomechanics Department at Sandia National Laboratories.

  17. QA Objectives for Nondestructive Assay at the Waste Receiving & Processing (WRAP) Facility

    SciTech Connect (OSTI)

    CANTALOUB, M.G.

    2000-08-01

    The Waste Receiving and Processing (WRAP) facility, located on the Word Site in southeast Washington, is a key link in the certification of transuranic (TRU) waste for shipment to the Waste Isolation Pilot Plant (WIPP). Waste characterization is one of the vital functions performed at WRAP, and nondestructive assay (NDA) measurements of TRU waste containers is one of two required methods used for waste characterization. The Waste Acceptance Criteria for the Waste Isolation Pilot Plant, DOE/WIPP-069 (WIPP-WAC) delineates the quality assurance objectives which have been established for NDA measurement systems. Sites must demonstrate that the quality assurance objectives can be achieved for each radioassay system over the applicable ranges of measurement. This report summarizes the validation of the WRAP NDA systems against the radioassay quality assurance objectives or QAOs. A brief description of the each test and significant conclusions are included. Variables that may have affected test outcomes and system response are also addressed.

  18. National Museum of Nuclear Science & History Opens WIPP Exhibit |

    Office of Environmental Management (EM)

    Department of Energy Museum of Nuclear Science & History Opens WIPP Exhibit National Museum of Nuclear Science & History Opens WIPP Exhibit November 22, 2011 - 3:17pm Addthis To celebrate the WIPP's 10,000th shipment of defense-related TRU waste, the National Museum of Nuclear Science & History added a new exhibit, which includes one the receptacles, pictured above, used by the Energy Department to ship transuranic (TRU) waste from sites located across the country to the Waste

  19. Construction Begins on New Waste Processing Facility | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Construction Begins on New Waste Processing Facility Construction Begins on New Waste Processing Facility February 9, 2012 - 12:00pm Addthis Workers construct a new facility that will help Los Alamos National Laboratory accelerate the shipment of transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) in Carlsbad for permanent disposal. Workers construct a new facility that will help Los Alamos National Laboratory accelerate the shipment of transuranic (TRU) waste to the Waste

  20. WIPP UPDATE: April 6, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2014 There is not a WIPP Recovery update today. Please go to the WIPP Recovery webpage at www.wipp.energy.gov for information on recent recovery activities. Community Meetings...

  1. During Phase 3, WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MORE- WIPP UPDATE: April 14, 2014 Phase 3 activities begin Two teams re-entered the WIPP underground facility on Saturday, moving closer to suspected location of the February 14 contamination release. It was the third re- entry in two weeks. The teams traveled farther into the mine than previous entries, evaluating ground conditions and checking for contamination. No contamination was detected and ground conditions were better than expected. During Phase 3, WIPP employees will enter the mine

  2. WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current News Releases March 20, 2015 - Event News Release #2 WIPP Emergency Operations Center Deactivated March 20, 2015 - Event News Release #1 Emergency Operation Center Activated as Precautionary Measure for Offsite Event November 25, 2014 CBFO and WIPP Volunteerism Helps Little Ones This Winter Karing for Kids Koat Drive November 10, 2014 CBFO and WIPP Commemorations for Veterans Day 2014 Photo 1: Veterans Commeration at Skeen-Whitlock, Nov. 6, 2014 Photo 2: Veterans Commeration at

  3. WIPP News Releases - 2003

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 14 Drum Involved in Idaho Incident Not Shippable to WIPP July 31 Marchetti New CEO of Washington TRU Solutions March 25 HUBZone, Great Opportunity for Small Businesses...

  4. WIPP News Releases - 2007

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Award Announced by U.S. Department of Energy September 6 Sharif Named New WTS General Manager July 24 EXO project equipment successfully placed underground at WIPP...

  5. WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sandia Labs December 13 Carlsbad Field Office Recognized by New Mexico and DOE for Environmental Excellence at WIPP Click on photo below for larger image. November 10 Carlsbad...

  6. WIPP Documents - Environmental Monitoring

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the operational period. The standards issued by the EPA are contained in Title 40 CFR, Part 191, Subpart A. Strategic Plan for Groundwater Monitoring at the WIPP DOE...

  7. WIPP UPDATE: July 22, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    22, 2014 Entries into WIPP underground resume Entries into the WIPP underground facility have resumed after being suspended for several weeks while workers changed air filters on...

  8. Implementation of the Resource Disincentive in 40 CFR part 191.14 (e) at the Waste Isolation Pilot Plant. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    In 1986, the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) (DOE-WPO) prepared a strategy for complying with the Environmental Protection Agency`s (EPA`s) Standards for the management of transuranic (TRU) waste. Section 3.2.2.2 of the DOE`s report addressed compliance with the Assurance Requirements found in 40 CFR {section} 191.14. One of the Assurance Requirements addresses the selection of repository sites that contain recoverable natural resources. This report documents that the site selection process for the WIPP facility did indeed comply with the natural resource disincentive requirement in 40 CFR {section} 191,14(e) at the time selected and therefore complies with the standard at this time. Thus, it shall be shown that it is reasonably certain that the WIPP site provides better overall protection than practical alternatives that were available when the site was selected. It is important to point out here, and it will be discussed later in the report, that the resource disincentive requirement is a preliminary siting criterion that requires further evaluation of sites that have resources (i.e, hydrocarbons, minerals and groundwater) in the vicinity or on the site. This further evaluation requires that for sites that do have resources, a qualitative determination must be made that the site will provide better overall protection than practical alternatives. The purpose of this report is not to provide a quantitative evaluation for selection of the WIPP site. A further discussion on the difference between the qualitative analysis required under 40 CFR {section} 191.14(e) and the quantitative analysis under other sections of 40 CFR 191 is provided in {section}2.1 of this report.

  9. 2013-08 "Waste Isolation Pilot Plant Storage for LANL" | Department of

    Broader source: Energy.gov (indexed) [DOE]

    Energy The intent of this recommendation is that DOE/EM and WIPP set their priorities for the remaining storage facilities at WIPP to ensure that there will be enough capacity to hold all TRU waste remaining at LANL and that the current disposal schedules can be met. PDF icon Rec 2013-08 - July 31, 2013 More Documents & Publications NNMCAB Board Minutes: July 2013 Los Alamos NNMCAB Committee Minutes: July 2013 Pojoaque 2013-02 "Review Material Disposal Areas at LANL in Addition to

  10. WIPP Documents - Federal Regulations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Regulations 40 CFR Part 191 Environmental radiation protection standards for management and disposal of spent nuclear fuel, high-level and transuranic radioactive wastes. 40 CFR Part 194 Criteria for the certification and re-certification of the Waste Isolation Pilot Plant's compliance with the 40 CFR Part 191 disposal regulations.

  11. Computational implementation of a systems prioritization methodology for the Waste Isolation Pilot Plant: A preliminary example

    SciTech Connect (OSTI)

    Helton, J.C.; Anderson, D.R.; Baker, B.L.

    1996-04-01

    A systems prioritization methodology (SPM) is under development to provide guidance to the US DOE on experimental programs and design modifications to be supported in the development of a successful licensing application for the Waste Isolation Pilot Plant (WIPP) for the geologic disposal of transuranic (TRU) waste. The purpose of the SPM is to determine the probabilities that the implementation of different combinations of experimental programs and design modifications, referred to as activity sets, will lead to compliance. Appropriate tradeoffs between compliance probability, implementation cost and implementation time can then be made in the selection of the activity set to be supported in the development of a licensing application. Descriptions are given for the conceptual structure of the SPM and the manner in which this structure determines the computational implementation of an example SPM application. Due to the sophisticated structure of the SPM and the computational demands of many of its components, the overall computational structure must be organized carefully to provide the compliance probabilities for the large number of activity sets under consideration at an acceptable computational cost. Conceptually, the determination of each compliance probability is equivalent to a large numerical integration problem. 96 refs., 31 figs., 36 tabs.

  12. The Direct Path To WIPP - 12471

    SciTech Connect (OSTI)

    Spoerner, M.T.; Burger, M.J.; Garcia, J. [Sandia National Laboratories (United States); Humphrey, B.J. [Weston Solutions, Inc. (United States); Rast, D. [National Nuclear Security Administration, Sandia Site Office (United States)

    2012-07-01

    Sandia National Laboratories/New Mexico (SNL/NM), designated as a small quantity site (SQS) by the National TRU Program (NTP), generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) waste primarily from the decontamination and clean-out of glove boxes at the Hot Cell Facility (HCF) at Technical Area (TA) V. All of the waste required repackaging, with the CH TRU waste being repackaged from late 2007 through 2011. Three shipments of CH were completed in October 2011, which de-inventoried SNL/NM's legacy TRU waste. In FY11, RH TRU waste was repackaged at the Auxiliary Hot Cell Facility (AHCF) located in TAV with the support of the Central Characterization Project (CCP). The waste was originally packaged in SNL/NM fabricated casks, cement or lead-lined 55-gallon drums, or 30-gallon drums. The AHCF is a small hot cell, with access only through a roof port which presented challenges for inserting and removing waste from the hot cell. The CCP provided visual examination operators (VEOs) to observe and document each waste item repackaged, removal of prohibited items, and radiological sampling. Dose-to-Curie measurements were calculated by CCP after a radiological report was prepared using scaling factors determined by the analysis of swipe samples. Finally, headspace gas samples were taken and sent to the Advanced Mixed Waste Treatment Project (AMWTP) for analysis. Despite the challenges, the RH waste is on track to be shipped to WIPP in early FY12. The processes used and procedures developed to conduct the repackaging operations, the issues identified and mitigated were challenging but the cooperation between SNL/NM and the Central Characterization Program (CCP) enabled SNL/NM to complete the repackaging and support the characterization and shipment. An inventory list, identification of the campaigns, discussion of the challenges and mitigations, and the final loading of the RH 72-B casks at TA-V for direct shipment to the Waste Isolation Pilot Plant (WIPP) will be discussed. Lessons learned from the RH campaigns are: - Some containers that were originally identified as HC-3 have been re-evaluated and became < HC-3 due to the conservative estimates made by the original generators - Operators at the AHCF were not accustomed to the detail required by the VE operators. However, they worked well together and the repackaging was completed ahead of schedule. - The AK was not always accurate as was demonstrated by the solid waste found in the drum during the first visit by EPA. That waste has since been determined to be low-level. - Two drums originally thought to be RH turned out to be CH and arrangement for RTR had to be made quickly. - Six of the original RH repacked drums became low level. - Lessons learned from the CH campaigns were helpful in avoiding many issues. The RH repackaging effort has been a success due to the expertise of the AHCF operators, supervisor, and manager, the conscientious attention to detail of the CCP VE operators, the experience of the CCP DTC and headspace gas sampling staff, and the guidance and support from CCP and CBFO. Sometimes schedules had to be adjusted, processes updated, and issues discussed, but the communication between CCP and SNL/NM was good. SNL/NM hopes to have the legacy RH TRU waste shipped off-site by early 2012. (authors)

  13. Shipping Remote Handled Transuranic Waste to the Waste Isolation Pilot Plant - An Operational Experience

    SciTech Connect (OSTI)

    Anderson, S.; Bradford, J.; Clements, T.; Crisp, D.; Sherick, M.; D'Amico, E.; Lattin, W.; Watson, K.

    2008-07-01

    On January 18, 2007, the first ever shipment of Remote Handled Transuranic (RH TRU) waste left the gate at the Idaho National Laboratory (INL), headed toward the Waste Isolation Pilot Plant (WIPP) for disposal, thus concluding one of the most stressful, yet rewarding, periods the authors have ever experienced. The race began in earnest on October 16, 2006, with signature of the New Mexico Environment Department Secretary's Final Order, ruling that the '..draft permit as changed is hereby approved in its entirety.' This established the effective date of the approved permit as November 16, 2006. The permit modification was a consolidation of several Class 3 modification requests, one of which included incorporation of RH TRU requirements and another of which incorporated the requirements of Section 311 of Public Law 108-137. The obvious goal was to complete the first shipment by November 17. While many had anticipated its approval, the time had finally come to actually implement, and time seemed to be the main item lacking. At that point, even the most aggressive schedule that could be seriously documented showed a first ship date in March 2007. Even though planning for this eventuality had started in May 2005 with the arrival of the current Idaho Cleanup Project (ICP) contractor (and even before that), there were many facility and system modifications to complete, startup authorizations to fulfill, and many regulatory audits and approvals to obtain before the first drum could be loaded. Through the dedicated efforts of the ICP workers, the partnership with Department of Energy (DOE) - Idaho, the coordinated integration with the Central Characterization Project (CCP), the flexibility and understanding of the regulatory community, and the added encouragement of DOE - Carlsbad Field Office and at Headquarters, the first RH TRU canister was loaded on December 22, 2006. Following final regulatory approval on January 17, 2007, the historic event finally occurred the following day. While some of the success of this endeavor can be attributed to the sheer will and determination of the individuals involved, the fact that it was established and managed as a separate sub-project under the ICP, accounts for a majority of the success. Utilizing a structured project management approach, including development of, and management to, a performance baseline, allowed for timely decision making and the flexibility to adapt to changing conditions as the various aspects of the project matured. This paper provides some insight into how this was achieved, in a relatively short time, and provides an overview of the experience of start-up of a new retrieval, characterization, loading, and transportation operation in the midst of an aggressive cleanup project. Additionally, as one might expect, everything within the project did not go as planned, which provides a great opportunity to discuss some lessons learned. Finally, the first shipment was just the beginning. There are 224 additional shipments scheduled. In keeping with the theme of WM 2008, Phoenix Rising: Moving Forward in Waste Management, this paper will address the future opportunities and challenges of RH TRU waste management at the INL. (authors)

  14. DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    mission of the WIPP and the National Transuranic Waste Program is to protect human health and the environment by safe management, retrieval, characterization,...

  15. Assessment of the potential for karst in the Rustler Formation at the WIPP site.

    SciTech Connect (OSTI)

    Lorenz, John Clay

    2006-01-01

    This report is an independent assessment of the potential for karst dissolution in evaporitic strata of the Rustler Formation at the Waste Isolation Pilot Plant (WIPP) site. Review of the available data suggests that the Rustler strata thicken and thin across the area in depositional patterns related to lateral variations in sedimentary accommodation space and normal facies changes. Most of the evidence that has been offered for the presence of karst in the subsurface has been used out of context, and the different pieces are not mutually supporting. Outside of Nash Draw, definitive evidence for the development of karst in the Rustler Formation near the WIPP site is limited to the horizon of the Magenta Member in drillhole WIPP-33. Most of the other evidence cited by the proponents of karst is more easily interpreted as primary sedimentary structures and the localized dissolution of evaporitic strata adjacent to the Magenta and Culebra water-bearing units. Some of the cited evidence is invalid, an inherited baggage from studies made prior to the widespread knowledge of modern evaporite depositional environments and prior to the existence of definitive exposures of the Rustler Formation in the WIPP shafts. Some of the evidence is spurious, has been taken out of context, or is misquoted. Lateral lithologic variations from halite to mudstone within the Rustler Formation under the WIPP site have been taken as evidence for the dissolution of halite such as that seen in Nash Draw, but are more rationally explained as sedimentary facies changes. Extrapolation of the known karst features in Nash Draw eastward to the WIPP site, where conditions are and have been significantly different for half a million years, is unwarranted. The volumes of insoluble material that would remain after dissolution of halite would be significantly less than the observed bed thicknesses, thus dissolution is an unlikely explanation for the lateral variations from halite to mudstone and siltstone. Several surficial depressions at WIPP, suggested to be sinkholes, do not have enough catchment area to form a sinkhole, and holes drilled to investigate the subsurface strata do not support a sinkhole interpretation. Surface drainage across the WIPP site is poorly developed because it has been disrupted by migrating sand dunes and because precipitation is not focused by defined catchment areas in this region of low precipitation and low-dip bedding, not because it has been captured by sinkholes. There are no known points of discharge from the Rustler Formation at WIPP that would indicate the presence of a subsurface karst drainage system. The existing drillholes across the WIPP site, though small in diameter, are sufficient to assess the probability of karst development along the horizontal fractures that are common in the Rustler Formation, and the area of investigation has been augmented significantly by the mapping of four large-diameter shafts excavated into the WIPP repository. The general absence of dissolution, karsting, and related conduits is corroborated by the pumping tests which have interrogated large volumes of the Rustler Formation between drillholes. Diffusion calculations suggest that separate isotopic signatures for the water found in the fractures and the water found in the pores of the matrix rock between fractures are unlikely, thus the isotopic evidence for ancient Rustler formation waters is valid. Geophysical techniques show a number of anomalies, but the anomalies do not overlap to portray consistent and mutually supporting patterns that can be definitively related to karst void space at any given location. The coincidence of the Culebra and Magenta potentiometric heads between Nash Draw and the WIPP site is the inevitable intersection of two non-parallel surfaces rather than an indication of karst-related hydraulic communication between the two units. The proponents of karst in the Rustler Formation at the WIPP site tend to mix data, to take data out of context, and to offer theory as fact. They do not analyze the data or synthesize

  16. WIPP Driver Makes History, Again | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 31, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - A brand-new shipping package arrived at the Department of Energy's Waste ...

  17. Pioneering Nuclear Waste Disposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T h e W a s t e I s o l a t i o n P i l o t P l a n t DOE 1980. Final Environmental Impact Statement, Waste Isolation Pilot Plant. DOE/EIS-0026, Washington, DC, Office of Environmental Management, U.S. Department of Energy. DOE 1981. Waste Isolation Pilot Plant (WIPP): Record of Decision. Federal Register, Vol. 46, No. 18, p. 9162, (46 Federal Register 9162), January 28, 1981. U.S. Department of Energy. DOE 1990. Final Supplement Environmental Impact Statement, Waste Isolation Pilot Plant.

  18. DRAFT EM SSAB Chair's Meeting Waste Disposition Strategies Update

    Office of Environmental Management (EM)

    Isolation Pilot Plant Update J.R. Stroble, CBFO For the Northern New Mexico Citizens Advisory Board January 27, 2016 www.energy.gov/EM 2 Corrective Actions The DOE TRU Waste Complex has implemented several changes since the 2014 radiological release incident at WIPP. Based on the Accident Investigation Report and subsequent evaluations, DOE has implemented several Corrective Actions that will prevent such incidents from occurring throughout the Life Cycle of WIPP. Five organizations have

  19. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 5: Appendices D and D, DEF, FAC

    SciTech Connect (OSTI)

    1995-03-31

    This plan serves to describe the objectives of decommissioning for the Waste Isolation Pilot Plant (WIPP), identifies the elements necessary to accomplish the decommissioning, and defines the steps to execute those elements in a safe and environmentally sound manner. The plan provides a strategy for progressing from the final actions of the Disposal Phase, through the Decontamination and Decommissioning Phase, and into the initiation of the Long-Term Monitoring Phase. This plan describes a sequence of events for decontamination of the WIPP facilities and structures used to manage and contain TRU and TRU mixed waste during the receipt and emplacement operations. Alternative methods of decontamination are provided where practical. The methods for packaging and disposal of the waste generated (derived waste) during this process are discussed. The best available technology at the time of this plan`s development, may become outmoded by future technology and alternative strategies. If alternative technologies are identified the affected stakeholder(s), the Secretary of the Interior and the State will be consulted prior to implementation.

  20. Milestone Shipment Arrives at WIPP | Department of Energy

    Office of Environmental Management (EM)

    Milestone Shipment Arrives at WIPP Milestone Shipment Arrives at WIPP September 30, 2013 - 12:00pm Addthis WIPP’s 700th defense-related RH-TRU waste shipment was transported in an RH-72B shipping package. The shipment from the Idaho site arrived Sept. 12. WIPP's 700th defense-related RH-TRU waste shipment was transported in an RH-72B shipping package. The shipment from the Idaho site arrived Sept. 12. CARLSBAD, N.M. - On Sept. 12, 2013, the 700th shipment of remote-handled (RH) transuranic

  1. Microsoft PowerPoint - WIPP Statement

    Office of Environmental Management (EM)

    EMHQ Approved Statement " The 3706 campaign is a high priority for the Department of Energy and Los Alamos. We are determined to complete the campaign on time and meet our obligations to the state of New Mexico. Toward that end, we are evaluating options to minimize any adverse impact of the WIPP event on LANL and other transuranic waste generator sites."

  2. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 7: Appendix GCR Volume 2

    SciTech Connect (OSTI)

    1995-03-31

    This report contains the second part of the geological characterization report for the Waste Isolation Pilot Plant. Both hydrology and geochemistry are evaluated. The following aspects of hydrology are discussed: surface hydrology; ground water hydrology; and hydrology drilling and testing. Hydrologic studies at the site and adjacent site areas have concentrated on defining the hydrogeology and associated salt dissolution phenomena. The geochemical aspects include a description of chemical properties of geologic media presently found in the surface and subsurface environments of southeastern New Mexico in general, and of the proposed WIPP withdrawal area in particular. The characterization does not consider any aspect of artificially-introduced material, temperature, pressure, or any other physico-chemical condition not native to the rocks of southeastern New Mexico.

  3. Microsoft Word - DOE-WIPP-02-3122-REV7 4-FINAL

    Office of Environmental Management (EM)

    WIPP-02-3122 TRANSURANIC WASTE ACCEPTANCE CRITERIA FOR THE WASTE ISOLATION PILOT PLANT Revision 7.4 Effective Date: April 22, 2013 U.S. Department of Energy Carlsbad Field Office 2 This document has been submitted as required to: Office of Scientific and Technical Information U.S. Department of Energy PO Box 62 Oak Ridge, TN 37831 (865) 576-8401 Additional information about this document may be obtained by calling 1-800-336-9477. Unlimited, publicly available full-text scientific and technical

  4. DOE-WIPP 02-3214 FINAL _3_.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    REMOTE-HANDLED TRU WASTE CHARACTERIZATION PROGRAM IMPLEMENTATION PLAN DOE/WIPP-02-3214 Revision 3 September 19, 2012 U.S. Department of Energy Carlsbad Field Office DOE/WIPP-02-3214 Revision 3 2 Table of Contents 1.0 Introduction ........................................................................................................................6 2.0 RH TRU Waste Characterization Program Requirements and Objectives .................7 2.1. Data Quality Objectives (DQOs) and Quality Assurance

  5. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 5, Uncertainty and sensitivity analyses of gas and brine migration for undisturbed performance

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    Before disposing of transuranic radioactive waste in the Waste Isolation Pilot Plant (WIPP), the United States Department of Energy (DOE) must evaluate compliance with applicable long-term regulations of the United States Environmental Protection Agency (EPA). Sandia National Laboratories is conducting iterative performance assessments (PAs) of the WIPP for the DOE to provide interim guidance while preparing for a final compliance evaluation. This volume of the 1992 PA contains results of uncertainty and sensitivity analyses with respect to migration of gas and brine from the undisturbed repository. Additional information about the 1992 PA is provided in other volumes. Volume 1 contains an overview of WIPP PA and results of a preliminary comparison with 40 CFR 191, Subpart B. Volume 2 describes the technical basis for the performance assessment, including descriptions of the linked computational models used in the Monte Carlo analyses. Volume 3 contains the reference data base and values for input parameters used in consequence and probability modeling. Volume 4 contains uncertainty and sensitivity analyses with respect to the EPA`s Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR 191, Subpart B). Finally, guidance derived from the entire 1992 PA is presented in Volume 6. Results of the 1992 uncertainty and sensitivity analyses indicate that, conditional on the modeling assumptions and the assigned parameter-value distributions, the most important parameters for which uncertainty has the potential to affect gas and brine migration from the undisturbed repository are: initial liquid saturation in the waste, anhydrite permeability, biodegradation-reaction stoichiometry, gas-generation rates for both corrosion and biodegradation under inundated conditions, and the permeability of the long-term shaft seal.

  6. DOE Completes TRU Waste Cleanup at Bettis | Department of Energy

    Office of Environmental Management (EM)

    TRU Waste Cleanup at Bettis DOE Completes TRU Waste Cleanup at Bettis September 23, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - The U.S. Department of Energy (DOE) has successfully completed cleanup of all Cold War legacy transuranic (TRU) waste at the Bettis Atomic Power Laboratory (BAPL) near Pittsburgh, Pa., permanently disposing of it at the Waste Isolation Pilot Plant (WIPP). BAPL is the 20th site to be completely cleaned of legacy TRU

  7. Waste Isolation Pilot Plant Status and Plans - 2010

    Office of Environmental Management (EM)

    Status and Plans WIPP Status and Plans - - 2010 2010 National Transportation Stakeholders Forum National Transportation Stakeholders Forum Chicago, Illinois Chicago, Illinois May 26, 2010 May 26, 2010 Dr. Dave Moody Dr. Dave Moody Manager Manager Carlsbad Field Office Carlsbad Field Office May 26, 2010 May 26, 2010 Transportation Success * First shipment to WIPP departed Los Alamos National Laboratory on March 25, 1999 * WIPP honored with U.S. Transport Council award for transportation safety in

  8. Transuranic waste disposal in the United State

    SciTech Connect (OSTI)

    Thompson, J.D.

    1986-01-01

    The US is unique in having created a special class of radioactive waste disposal based on the concentration of transuranic (TRU) elements in the waste. Since 1970, the US has been placing newly generated TRU waste in retrievable storage. It is intended that these wastes will be placed in a permanent deep geologic repository, the Waste Isolation Pilot Plant (WIPP). The WIPP opening for a demonstration emplacement period is set for October 1988. Transuranic wastes derive from some of the manufacturing and research activities carried out by the US Department of Energy (DOE). The bulk of this waste is generated in plutonium parts fabrication activities. A variety of plutonium-contaminated materials ranging from glove boxes, high-efficiency particulate air filters, and machine tools, to chemical sludges derived from plutonium recovery streams are stored as TRU wastes. Other processes that generate TRU waste are plutonium production operations, preparation for and cleanup from fuel reprocessing, manufacturing of plutonium heat sources, and nuclear fuel cycle research activities. Extensive procedures will be used to examine and prepare waste before it is placed in the WIPP for disposal. After the WIPP opens, certified waste will be transported to it and emplaced in the repository.

  9. Contact-Handled and Remote-Handled Transuranic Waste Packaging

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-08-09

    Provides specific instructions for packaging and/or repackaging contact-handled transuranic (CH-TRU) and remote-handled transuranic (RH-TRU) waste in a manner consistent with DOE O 435.1, Radioactive Waste Management, DOE M 435.1-1 Chg 1, Radioactive Waste Management Manual, CH-TRU and RH-TRU waste transportation requirements, and Waste Isolation Pilot Plant (WIPP) programmatic requirements. Does not cancel/supersede other directives.

  10. EIS-0026; Waste Isolation Pilot Plant Disposal Phase Final Supplementa...

    Office of Environmental Management (EM)

    by calling 1 (800) 336-9477 COVER SHEET Lead Agency: U.S. Department of Energy Title: Waste Isolation Pilot Plant Disposal Phase Final Supplemental Environmental Impact Statement...

  11. Fact Sheet Investigation of Incident at Waste Isolation Pilot...

    Energy Savers [EERE]

    Team (TAT) concluded that one drum, Drum 68660, was the source of radioactive contamination released during the February 14, 2014, radiological event at WIPP. The contents of...

  12. WIPP Documents - All documents by number

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Note: Documents that do not have document numbers are not included in this listing. Large file size alert This symbol means the document may be a large file size. All documents by number Common document prefixes DOE/CAO DOE/TRU DOE/CBFO DOE/WIPP DOE/EA NM DOE/EIS Other DOE/CAO Back to top DOE/CAO 95-1095, Oct. 1995 Remote Handled Transuranic Waste Study This study was conducted to satisfy the requirements defined by the WIPP Land Withdrawal Act and considered by DOE to be a prudent exercise in

  13. Waste Isolation Pilot Plant Typifies Optimizing Resources to Maximize

    Office of Environmental Management (EM)

    Results | Department of Energy Plant Typifies Optimizing Resources to Maximize Results Waste Isolation Pilot Plant Typifies Optimizing Resources to Maximize Results March 5, 2013 - 12:00pm Addthis EM Carlsbad Field Office (CBFO) Manager Joe Franco, right, presents a memento to EM Senior Advisor Dave Huizenga EM Carlsbad Field Office (CBFO) Manager Joe Franco, right, presents a memento to EM Senior Advisor Dave Huizenga Three HalfPACT transportation packages on a Waste Isolation Pilot Plant

  14. Enterprise Assessments Review of Waste Isolation Pilot Plant Engineering

    Energy Savers [EERE]

    and Procurement Processes - November 2015 | Department of Energy Waste Isolation Pilot Plant Engineering and Procurement Processes - November 2015 Enterprise Assessments Review of Waste Isolation Pilot Plant Engineering and Procurement Processes - November 2015 November 2015 Review of Engineering and Procurement Processes The U.S. Department of Energy (DOE) Office of Environment, Safety and Health Assessments, within the independent Office of Enterprise Assessments (EA), conducted a review

  15. WIPP Update 7_28_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP UPDATE: July 28, 2014 MSHA performs WIPP inspection The Mine Safety and Health Administration (MSHA) recently inspected the WIPP facility. Since underground access was not...

  16. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect (OSTI)

    GREAGER, T.M.

    2000-12-06

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

  17. Transuranic waste disposal in the United States

    SciTech Connect (OSTI)

    Hoffman, R.B.

    1986-01-01

    The United States is unique in having created a special class of radioactive waste disposal based on the concentration of transuranic elements in the waste. Since 1970, the US has been placing newly generated transuranic waste in retrievable storage. It is intended that these wastes will be placed in a permanent deep geologic repository, the Waste Isolation Pilot Plant (WIPP). WIPP opening for a demonstration emplacement period is set for October, 1988. Transuranic wastes derive from some of the manufacturing and research activities carried out by DOE. The bulk of this waste is generated in plutonium parts fabrication activities. A variety of plutonium contaminated materials ranging from glove boxes, HEPA filters, and machine tools, to chemical sludges derived from plutonium recovery streams are stored as TRU wastes. Other processes that generate TRU waste are plutonium production operations, preparation for and cleanup from fuel reprocessing, manufacturing of plutonium heat sources, and nuclear fuel cycle research activities.

  18. RH TRU Waste Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Remote-Handled Transuranic Waste Program After seven years and more than 5,000 safe shipments of contact-handled (CH) transuranic (TRU) waste, the Waste Isolation Pilot Plant is now also receiving remote-handled (RH) TRU waste. In October 2006, the New Mexico Environment Department (NMED) approved the U.S. Department of Energy's plans for disposal of RH-TRU waste at WIPP. The Environmental Protection Agency (EPA) gave its approval in 2004. Located in the remote desert of southeastern New Mexico,

  19. Resuming Operations at WIPP and the National TRU Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy WIPP and the National TRU Program Resuming Operations at WIPP and the National TRU Program Presentation from the 2015 DOE National Cleanup Workshop by Phil Breidenbach, Project Manager, Nuclear Waste Partnership, LLC. PDF icon Resuming Operations at WIPP and the National TRU Program More Documents & Publications Voluntary Protection Program Onsite Review, Nuclear Waste Partnership, LLC - March 2015 Operating Experience Summary - 2015-01 - November 20, 2015 Before the House

  20. Idaho National Engineering Laboratory code assessment of the Rocky Flats transuranic waste

    SciTech Connect (OSTI)

    1995-07-01

    This report is an assessment of the content codes associated with transuranic waste shipped from the Rocky Flats Plant in Golden, Colorado, to INEL. The primary objective of this document is to characterize and describe the transuranic wastes shipped to INEL from Rocky Flats by item description code (IDC). This information will aid INEL in determining if the waste meets the waste acceptance criteria (WAC) of the Waste Isolation Pilot Plant (WIPP). The waste covered by this content code assessment was shipped from Rocky Flats between 1985 and 1989. These years coincide with the dates for information available in the Rocky Flats Solid Waste Information Management System (SWIMS). The majority of waste shipped during this time was certified to the existing WIPP WAC. This waste is referred to as precertified waste. Reassessment of these precertified waste containers is necessary because of changes in the WIPP WAC. To accomplish this assessment, the analytical and process knowledge available on the various IDCs used at Rocky Flats were evaluated. Rocky Flats sources for this information include employee interviews, SWIMS, Transuranic Waste Certification Program, Transuranic Waste Inspection Procedure, Backlog Waste Baseline Books, WIPP Experimental Waste Characterization Program (headspace analysis), and other related documents, procedures, and programs. Summaries are provided of: (a) certification information, (b) waste description, (c) generation source, (d) recovery method, (e) waste packaging and handling information, (f) container preparation information, (g) assay information, (h) inspection information, (i) analytical data, and (j) RCRA characterization.