  1. PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE

    Broader source: Energy.gov [DOE]

    Carlsbard, NM - The effectiveness of the Waste Isolation Pilot Plant’s (WIPP) preventive maintenance program paid huge dividends late last month when an issue with a steel rope on the project’s waste conveyance was identified during a routine inspection.

  2. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Stakeholder Information Index 2016 WIPP Stakeholder Information Documents 2015 WIPP Stakeholder Information Documents 2014 WIPP Stakeholder Information Documents 2013 WIPP Stakeholder Information Documents 2012 WIPP Stakeholder Information Documents 2011 WIPP Stakeholder Information Documents 2010 WIPP Stakeholder Information Documents 2009 WIPP Stakeholder Information Documents 2008 WIPP Stakeholder Information Documents 2007 WIPP Stakeholder Information Documents 2006 WIPP Stakeholder

  3. WIPP Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Large file size alert This symbol means the document may be a large file size. Environmental Monitoring Documents about environmental monitoring at WIPP, including annual site environmental reports Environmental Protection Agency Certification Documents about WIPP's EPA certification Federal Regulations Standards and compliance criteria for WIPP Hazardous Waste Facility Permit Documents related to the state of New Mexico's oversight of WIPP under the authority of the Resource Conservation and

  4. WIPP Opportunities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Careers at WIPP How to apply for a job at WIPP CBFO Procurement All the information you need to provide goods and/or services to CBFO NWP Procurement All the information you need to provide goods and/or services to NWP Science@WIPP WIPP is available to scientists for conducting unique underground research Small Business/ Small Disadvantaged Business For more information about contract opportunities with the U.S. Department of Energy, see the following publications: Doing Business with the U.S.

  5. WIPP UPDATE: September 9, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2014 Additional areas cleared in WIPP underground facility WIPP personnel continue to work diligently to restore normal access to the WIPP underground facility. The graphic below identifies areas that have been surveyed for radiological contamination. The areas highlighted in green have been found to be contamination free. The surveys are conducted on the salt surfaces of the mine, but also include survey and release of any equipment or other structures located in these areas. Individuals

  6. WIPP Transportation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transuranic Waste Transportation Container Documents Documents related to transuranic waste containers and packages. CBFO Tribal Program Information about WIPP shipments across tribal lands. Transportation Centralized Procurement Program - The Centralized Procurement Program provides a common method to procure standard items used in the packaging and handling of transuranic wasted destined for WIPP. Transuranic Waste Transportation Routes - A map showing transuranic waste generator sites and

  7. WIPP UPDATE: October 21, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 21, 2014 First liquid fueled vehicle returned to service in WIPP underground The first piece of diesel-powered equipment has been returned to service in the WIPP underground facility. Last week, workers inspected the four-ton forklift and performed preventative maintenance so that it could be returned to service. The forklift will support various activities over the next several weeks, including resumption of bolting activities, final waste hoist inspections, and moving equipment

  8. WIPP Site By The Numbers August 2015

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 ft. By the Numbers The Waste Isolation Pilot Plant (WIPP) is a Department of Energy facility designed to safely isolate defense- related transuranic (TRU) waste from people and the environment. WIPP, which began waste disposal operations in 1999, is located 26 miles outside of Carlsbad, New Mexico. Waste temporarily stored at sites around the country is shipped to WIPP and permanently disposed in rooms mined out of an ancient salt formation below the surface. TRU waste destined for WIPP

  9. Radiological Monitoring Continues at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiological Monitoring Continues at WIPP CARLSBAD, N.M., February 19, 2014 - Radiological control personnel continue to collect surface and underground monitoring samples at the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) after an underground air monitor detected airborne radiation around 11:30 p.m. (MT) on February 14. Recent laboratory analyses by Carlsbad Environmental Monitoring and Research Center (CEMRC) found some trace amounts of americium and plutonium from a

  10. WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thousand Nuclear Waste Containers Safely Disposed at WIPP April 8 WIPP Mine Rescue Teams Excel at Regional Competition February 18 Security Walls-Triumph Technologies Team Awarded...

  11. WIPP Privacy Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Privacy Policy and Disclaimers NOTICE: The Waste Isolation Pilot Plant (WIPP) Internet Server is provided as a service of the Department of Energy (DOE) for distribution of...

  12. WIPP Update 7_28_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP UPDATE: July 28, 2014 MSHA performs WIPP inspection The Mine Safety and Health Administration (MSHA) recently inspected the WIPP facility. Since underground access was not available at the time of the visit, inspectors focused on the surface facilities. Following their inspection, MSHA issued 52 citations for various conditions including general workplace tidiness, exposed electrical wiring and missing safety guards on equipment. Currently, 49 of the citations have been addressed and

  13. WIPP Home Page Search

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home Page Search Enter word(s) to search for on the WIPP Home Page: Search

  14. WIPP News Releases - 1996

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 News Releases DOE to Hold Public Hearings Next Week in Albuquerque on WIPP SEIS - 12/31/96 DOE to Hold Public Hearings Next Week in Santa Fe on WIPP SEIS - 12/31/96 DOE Announces North Augusta Public Hearing for WIPP SEIS - 12/17/96 DOE Announces Denver Area Public Hearing for WIPP SEIS - 12/17/96 DOE Announces Richland Public Hearing for WIPP SEIS - 12/17/96 DOE Announces Santa Fe Public Hearings for WIPP SEIS - 12/17/96 DOE Announces Boise Public Hearing for WIPP SEIS - 12/17/96 DOE

  15. Hi-Res WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Isolation Pilot Plant The WIPP facility is located southeast of Carlsbad, N.M. 26miles are employed at WIPP, which includes employees supporting waste characterization and packaging activities at the generator sites. 1,000 people The U.S. Department of Energy's (DOE) WIPP facility has safely disposed of the nation's defense related transuranic (TRU) radioactive waste for the past WIPP began operations in March 1999 WIPP is the only federal repository for the nation's TRU waste TRU waste

  16. WIPP Documents - Nuclear Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Safety DOE/WIPP-07-3372, Revision 5b, WIPP Documented Safety Analysis Approved April 2016 The Documented Safety Analysis addresses all hazards (both radiological and nonradiological) and the controls necessary to provide adequate protection to the public, workers, and the environment. The WIPP DSA demonstrates the extent to which the Waste Isolation Pilot Plant can be operated safely with respect to workers, the public, and the environment. DOE/WIPP-07-3373, Revision 5b, WIPP Technical

  17. WIPP Information Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP milestones are noted on banners at the WIPP Experience Exhibit at the Skeen-Whitlock Building in Carlsbad. The WIPP Experience Exhibit at 4021 National Parks Highway in Carlsbad, N.M. WIPP Information Center Address: 4021 National Parks Highway Carlsbad, NM 88220 Toll-free telephone number: 1-800-336-WIPP (9477) E-mail inquiries are welcomed For emergency contact information, please refer to the Joint Information Center page. Media Contacts Tim Runyon U.S. Department of Energy WIPP Recovery

  18. WIPP Recovery Information

    Broader source: Energy.gov [DOE]

    At the March 26, 2014 Board meeting J. R. Stroble CBFO, Provided Information on Locations to Access WIPP Recovery Information.

  19. WIPP Nitrate Updates 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 WIPP Nitrate Salt Bearing Waste Container Isolation Plan Implementation Update, July 23, 2015 Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF WIPP Nitrate Salt Bearing Waste Container Isolation Plan Implementation Update, July 16, 2015 Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF WIPP Nitrate Salt Bearing Waste Container Isolation Plan Implementation Update, July 9, 2015 Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF WIPP Nitrate Salt Bearing

  20. WIPP Projects Interative Map

    Broader source: Energy.gov [DOE]

    View WIPP Projects in a larger map. To report corrections, please email WeatherizationInnovation@ee.doe.gov.

  1. WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 News Releases December 21 WIPP Receives First Remote-Handled Waste Shipment From Sandia Labs December 13 Carlsbad Field Office Recognized by New Mexico and DOE for Environmental Excellence at WIPP Click on photo below for larger image. November 10 Carlsbad Field Office Manager Selected November 9 WIPP Receives Top Safety Award November 9 Photos of New WIPP Transportation Exhibit's Debut at the National Museum of Nuclear Science and History Click on photos below for larger images. November 2

  2. WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 News Releases December 18 CBFO Selects Quality Assurance Director Click on photo below for larger image. December 2 Carlsbad Field Office Deputy Manager Selected Click on photo below for larger image. September 20 WIPP Management and Operating Contractor Recognized for Continuous Safety Performance Click on photo below for larger image. September 18 WIPP Receives Top Mine Safety Award September 18 WIPP Honored for Sustainability August 2 WIPP Employee Inducted Into Mine Rescue Hall of Fame -

  3. WIPP News Releases - 2005

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 News Releases December 27 Empty WIPP truck overturns December 12 Dr. Dave Moody to Lead the Carlsbad Field Office December 7 WIPP Satellite Tracking System Relocates to Carlsbad November 23 Statement of Vernon Daub, Acting Manager of DOE's Carlsbad Field Office, Regarding New Mexico Environment Department's Issuance of a Draft Hazardous Waste Facility Permit for WIPP October 7 DOE Awards WIPP Independent Oversight Contract August 11 DOE Awards Technical Assistance Contract to Support Carlsbad

  4. WIPP News Releases - 2006

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Back to current year news releases 2006 News Releases December 12 Idaho National Laboratory Waste Stream Cleared for Shipment to WIPP November 15 WIPP Reaches 4-Million-Hour Safety Milestone October 16 State of New Mexico Issues Permit for Remote-Handled Waste at WIPP September 11 WIPP receives 5,000th shipment March 29 DOE Waste Isolation Pilot Plant Receives EPA Recertification

  5. WIPP News Releases - 2004

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 News Releases November 4 Detwiler Resumes Position at DOE Headquarters October 14 WIPP Mine Rescue Team First in Missouri October 12 DOE Announces WIPP Contract Negotiations October 6 Washington TRU Solutions is Mine Operator of the Year September 28 Washington Group International Named Tops in Safety July 24 No Damage to WIPP Cargo in Roswell Traffic Accident July 22 WIPP Mine Rescue Team Wins "Overall Contest" at Nationals July 2 DOE Prevails in WIPP Court Case July 1 $1M to Fund

  6. WIPP News Releases - 1995

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 News Releases Westinghouse WID Earns DOE Quality Award - 11/08/95 DOE Accelerates WIPP Schedule - 10/20/95 WIPP Celebrates National Quality Month - 10/13/95 Assistant DOE Secretary Transfers WIPP Technology - 10/10/95 DOE Extends EIS Public Comment Period - 10/06/95 DOE Closes Underground Experimental Area - 09/28/95 SEIS Meetings Held For WIPP - 09/12/95 Lee Named Deputy GM For Westinghouse WID - 08/25/95 WIPP Transportation System At Trade Show - 07/11/95 Technology Transfer - 07/07/95

  7. WIPP News & Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlsbad Field Office Information WIPP Overview Click on the Play button for an overview of the Waste Isolation Pilot Plant. (2.5 minutes, FLASH required) If you are not able to view the WIPP Overview, try clicking the graphic above to download the free Flash Player. News Releases Current and archived news releases TRU TeamWorks Read WIPP's online newsletter Fact Sheets Learn about WIPP basics with these educational summaries of popular topics Photo Gallery See photos of the work done at WIPP

  8. WIPP Safety Is Paramount Top to Bottom, Literally

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – As part of the Waste Isolation Pilot Plant’s (WIPP) preventive maintenance program, four of six head ropes that suspend the waste conveyance were safely replaced recently.

  9. WIPP - Pioneering Nuclear Waste Disposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pioneering Nuclear Waste Disposal Cover Page and Table of Contents Closing the Circle The Long Road to WIPP - Part 1 The Long Road to WIPP - Part 2 Looking to the Future Related Reading and The WIPP Team

  10. WIPP Documents - Environmental Management and Sustainability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management and Sustainability WIPP Environmental Policy Statement DOE/WIPP 04-3310, Rev 6 Environmental Management System Description DOE/WIPP-05-3318, Rev 6 WIPP Site Sustainability Plan DOE/WIPP-14-3542

  11. WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 News Releases December 1 State Renews WIPP Facility Permit November 18 National TRU Program Director Selected November 18 Waste Isolation Pilot Plant Receives Second EPA Recertification October 7 WIPP Receives 9,000th Shipment September 7 Carlsbad Field Office Manager Transition July 2 DOE Awards Technical Assistance Contract for Carlsbad Field Office June 14 WIPP Completes California Sites Cleanup May 3 DOE Extends Management and Operations Contract at Waste Isolation Pilot Plant May 3 DOE

  12. WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 News Releases October 29 WIPP Environmental Initiatives Earn DOE Recognition Click on photo below for larger image. October 24 WIPP Security Contractor Receives DOE Voluntary Protection Program Award Click on photo below for larger image. October 17 WIPP Employees Among Honorees for Nuclear Footprint Reduction October 3 DOE Exceeds 2012 TRU Waste Cleanup Goal at Los Alamos National Laboratory September 19 DOE Awards Grant to New Mexico Environment Department for Waste Isolation Pilot Plant

  13. WIPP Documents - Environmental Monitoring

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Monitoring Compliance Monitoring Implementation Plan for 40 CFR §191.14(b), Assurance Requirement - DOE/WIPP 99-3119 Rev. 8 Effective date: 10/2014 Discharge Permit Renewal, DP-831, Waste Isolation Pilot Plant, July 29, 2014 Overview of the WIPP Effluent Monitoring Program - technical paper Provides an overview of the effluent air monitoring activities at WIPP. The Effluent Monitoring Program is designed to comply with the EPA radiation protection standards for management and storage of

  14. WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current News Releases March 20, 2015 - Event News Release #2 WIPP Emergency Operations Center Deactivated March 20, 2015 - Event News Release #1 Emergency Operation Center Activated as Precautionary Measure for Offsite Event November 25, 2014 CBFO and WIPP Volunteerism Helps Little Ones This Winter Karing for Kids Koat Drive November 10, 2014 CBFO and WIPP Commemorations for Veterans Day 2014 Photo 1: Veterans Commeration at Skeen-Whitlock, Nov. 6, 2014 Photo 2: Veterans Commeration at

  15. WIPP Recovery Effort

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WIPP Update Frank Marcinowski Deputy Assistant Secretary for Waste Management Office of Environmental Management EMSSAB Chairs Meeting, April 23, 2014 - Pasco, WA www.energy.gov/EM 2 Waste Isolation Pilot Plant www.wipp.doe.gov www.energy.gov/EM 3 February 5th Fire: * All operations at the repository ceased following salt haul truck fire in the WIPP underground * An investigation team was deployed to determine the cause of the fire * Report released March 13th February 14th Radiological

  16. WIPP UPDATE: May 8, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, 2014 Evaluation of WIPP radiological protection program underway Today began a comprehensive evaluation of the WIPP site's radiological protection program, which is a key element in the WIPP recovery process. At the request of WIPP management, experts from across the country will assist in the evaluation to identify program strengths and areas for improvement to strengthen WIPP's radiological protection program. The team will review the WIPP program for compliance with federal regulations

  17. Prestart Activities Continue at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    waste handling personnel review a procedure as part of prestart activities at WIPP. WIPP UPDATE: June 22, 2016 Prestart Activities Continue at WIPP Prestart activities are continuing at the Waste Isolation Pilot Plant (WIPP) as employees verify and validate operating procedures in preparation for resuming transuranic waste emplacement operations at WIPP. On June 1 WIPP workers began the phase of prestart activities referred to as Cold Operations. Cold Operations includes verifying adequacy of

  18. WIPP Recovery Progress

    Broader source: Energy.gov [DOE]

    At the March 25, 2015 Board meeting J. R. Stroble CBFO, Provided Information on the Status of the Recovery Effort at the WIPP Site.

  19. WIPP News Releases - 1999

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... WIPP Emergency Response Instructors Train Idaho Tribal ... functions, program planning and budgeting, training ... of fabrication problems inherent in making a single award. ...

  20. 2009 WIPP News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    09 News Releases December 21 Magnum Minerals to Buy WIPP Salt October 14 Agreement Reached Between WTS and Union Employees October 1 Truck Accident Did Not Involve WIPP Shipment September 18 WIPP Completes First RH-TRU Shipment from VNC July 24 DOE Issues Statement Concerning Debates Over Waste Disposal in Salt June 25 DOE Carlsbad Field Office Opens Local Recovery Act Office June 18 DOE Announces the Transfer of the WIPP Water Line to the City of Carlsbad June 3 Los Alamos National Laboratory

  1. WIPP News Releases - 2007

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Award Announced by U.S. Department of Energy September 6 Sharif Named New WTS General Manager July 24 EXO project equipment successfully placed underground at WIPP...

  2. WIPP UPDATE: September 19, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19, 2014 No second release at WIPP Recent news reports have incorrectly suggested that there is a second breached drum in the Waste Isolation Pilot Plant (WIPP) underground...

  3. WIPP UPDATE: May 14, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    release, WIPP personnel are also upgrading WIPP safety programs and addressing issues identified by federal accident investigators following the fire and radiological event. ...

  4. WIPP Firefighters Complete Fire Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 24, 2016 WIPP Firefighters Complete Fire Training Members of the WIPP fire department recently participated in Live Fire Training at the Permian Basin Regional Training Center ...

  5. WIPP News Releases - 2002

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 News Releases September 30 Westinghouse Earns Mine Safety Award for 16th Consecutive Year July 9 Westinghouse TRU Solutions LLC Earns Corporate Award For Air Monitoring Initiative April 12 WIPP Receives Waste Characterized With Mobile System February 12 Ava Holland Joins DOE Carlsbad Field Office As Quality Assurance Manager January 7 WIPP Receives 500th Waste Shipment

  6. WIPP Documents - EPA Certification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EPA Certification Compliance Certification Application DOE's 72,000-page application submitted to the U.S. Environmental Protection Agency showing how WIPP meets all applicable federal transuranic radioactive waste standards. (Click on CCA -1996) Compliance Recertification Application - 2004 The recertification application showing how WIPP continues to meet all applicable federal transuranic radioactive waste standards. Compliance Recertification Application - 2009 The recertification

  7. Empty WIPP truck overturns

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Washington TRU Solutions (505) 234-7204 www.wipp.energy.gov U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 DOENews For Immediate Release Empty WIPP truck overturns CARLSBAD, N.M., December 27, 2005 - The U.S. Department of Energy (DOE) Carlsbad Field Office reports that a Waste Isolation Pilot Plant (WIPP) truck carrying three empty TRUPACT-II shipping containers overturned on Interstate 15 near Blackfoot, Idaho, at

  8. WIPP AIB Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    on February 14 Incident at the Waste Isolation Pilot Project (WIPP) in Carlsbad, New Mexico June 30, 2014 Drums at Los Alamos containing nitrate salt waste Drums at Los Alamos...

  9. WIPP Nitrate Updates 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update, December 4, 2014 Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF Jose R. FrancoCBFO and Robert L. McQuinnNWP dated December 5, 2014 WIPP Nitrate Salt...

  10. WIPP - Fact Sheets

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    provided by the U.S. Environmental Protection Agency. The Karst and Related Issues at the Waste Isolation Pilot Plant - A paper addressing the issue of karst at WIPP by Dr. Lokesh...

  11. WIPP Accelerating Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ACCELERATING CLEANUP: PATHS TO CLOSURE CARLSBAD AREA OFFICE JUNE 1998 I. Operations/Field Overview CAO Mission The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant (WIPP) for safe disposal of transuranic (TRU) waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to CAO, WIPP site operations, transportation, and other

  12. WIPP News Releases - 2003

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 News Releases December 18 50,000 Containers Safety Disposed at WIPP August 14 Drum Involved in Idaho Incident Not Shippable to WIPP July 31 Marchetti New CEO of Washington TRU Solutions March 25 HUBZone, Great Opportunity for Small Businesses February 18 TRU Solutions Announces $20,500 in Scholarships For Eddy and Lea County Students January 14 Washington TRU Solutions LLC Announces New Name and New General Manager

  13. Careers at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Careers at WIPP The WIPP team is comprised of multiple organizations with varied methods of applying for posted positions. Information for various organizations is provided below. U.S. Department of Energy Carlsbad Field Office U.S. Department of Energy, Carlsbad Field Office job vacancies are advertised and filled through the automated federal application system at https://www.usajobs.gov/ All applicants are required to apply for job vacancies using this system. After establishing a "New

  14. Science @WIPP: Underground Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Underground Laboratory Double Beta Decay Dark Matter Biology Repository Science Renewable Energy Underground Laboratory The deep geologic repository at WIPP provides an ideal environment for experiments in many scientific disciplines, including particle astrophysics, waste repository science, mining technology, low radiation dose physics, fissile materials accountability and transparency, and deep geophysics. The designation of the Carlsbad Department of Energy office as a "field"

  15. WIPP Opportunities - Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NWP Procurement Services Staff Directional Map to WIPP Procurement Sources Sought Open Requests for Proposals Commodities Used by WIPP NWP General Terms & Conditions for Commercial Items (10-12, Rev 0) NWP General Provisions for Cost Reimbursement Contracts (10-12, Rev 0) NWP General Provisions for Firm Fixed Price Construction Subcontracts (10-12, Rev 0) NWP General Provisions for Firm Fixed Price Orders (10-12, Rev. 0) Representations and Certifications Greater than $25,000

  16. WIPP Receives Top Safety Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Receives Top Safety Award CARLSBAD, N.M., November 10, 2011 - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) received top accolades from New...

  17. WIPP Activates Emergency Operations Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 5, 2015 WIPP Activates Emergency Operations Center At approximately 7:00 p.m. MDT on Tuesday, August 4, the Waste Isolation Pilot Plant (WIPP) activated the Emergency...

  18. Microsoft Word - WIPP9000.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    88221 Fo WIPP r October 7 (WIPP) rec arking an cold war. nt mileston RU waste PP team ha ctive of the pment, wh PP at abou aste Treatm half of the IPP has re RU waste s Environm...

  19. WIPP UPDATE: April 7, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2014 EPA to install additional air monitors This week, Environmental Protection Agency (EPA) employees will arrive at the Waste Isolation Pilot Plant (WIPP) to install additional air monitors. The monitors will be temporarily placed near existing on- site WIPP air monitors to provide independent monitoring results and verification of WIPP's environmental monitoring network. EPA is also evaluating the number and location of WIPP's current environmental monitors to identify any needed

  20. WIPP UPDATE: December 18, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    18, 2014 CEMRC releases final summary report on WIPP The Carlsbad Environmental Monitoring and Research Center (CEMRC) has posted its final summary report regarding the February 14 radiological event that occurred at the Waste Isolation Pilot Plant (WIPP). CEMRC is a division of the College of Engineering at New Mexico State University that provides independent monitoring of the WIPP facility. Following the radiological release that occurred at WIPP, CEMRC increased its monitoring activities -

  1. WIPP Employee Inducted Into Mine Rescue Hall of Fame - WIPP Teams...

    Office of Environmental Management (EM)

    Employee Inducted Into Mine Rescue Hall of Fame - WIPP Teams Recognized at National Competition WIPP Employee Inducted Into Mine Rescue Hall of Fame - WIPP Teams Recognized at ...

  2. Science@WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    At the dawn of discovery ... Science@WIPP The deep geologic repository at WIPP is more than a place to dispose of transuranic (TRU) waste – it’s also a science laboratory. Following the designation of the Department of Energy’s Carlsbad office as a field office in 2000, numerous universities and research institutions across the nation sought to take advantage of WIPP’s strong safety culture, open door policy, and extremely low levels of natural background radiation in the underground. It’s

  3. WIPP Ends Safety Pause

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 28, 2016 WIPP Ends Safety Pause A safety pause, declared by Nuclear Waste Partnership in response to air quality issues in two remote areas of the WIPP underground, was ended and normal work in these areas has resumed. The pause began February 22 after workers detected elevated levels of carbon monoxide and volatile organic compounds (VOC) in two areas at extreme ends of the underground. The pause allowed time to thoroughly investigate each event while work in un-impacted portions of the

  4. WIPP - Photo Gallery

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gallery Shortcuts WIPP Site Transportation Contact-Handled TRU Waste Remote-Handled TRU Waste Mining Photo Gallery Click on a thumbnail image to see a larger version of the photographs. WIPP Site Back to top The entrance to the Waste Isolation Pilot Plant near Carlsbad, N.M. The entrance to the Waste Isolation Pilot Plant near Carlsbad, N.M. The Waste Isolation Pilot Plant at sunrise. The Waste Isolation Pilot Plant at sunrise. A view of the Waste Isolation Pilot Plant from a distance. A view of

  5. WIPP - Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quick links TRUPACT-II Shipping Container RH-72B Shipping Cask Waste Handling Waste Emplacement First Waste Shipment to WIPP March 26, 1999 Video Clips Instructions for playing video clips in Flash format: 1. Click on the screen you wish to view 2. Click on the play button TRUPACT-II Shipping Container The TRUPACT-II shipping container is certified by the Nuclear Regulatory Commission for shipping contact-handled transuranic waste to WIPP. It can hold up to 14 55-gallon drums or the equivalent.

  6. WIPP UPDATE: April 6, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2014 There is not a WIPP Recovery update today. Please go to the WIPP Recovery webpage at www.wipp.energy.gov for information on recent recovery activities. Community Meetings Scheduled April 9 - WIPP update to Carlsbad Rotary Club at 12 p.m. Location: Stevens Inn, 1829 S. Canal St. April 10 - Carlsbad Mayor Dale Janway and DOE will co-host a Town Hall meeting Thursday, April 10, featuring updates on WIPP recovery activities. The town hall meetings are held at 5:30 p.m. every Thursday at the

  7. WIPP - Related FOIA Sites

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOIA Reading Room DOE Headquarters FOIA Program Department of Justice (DOJ) Office of Information and Privacy Records that have been released in response to multiple written requests for information under the FOIA or are likely to be requested again: Current Contracts Expired Contracts Other Documents Final opinions made in the adjudication of cases DOE Directives, Regulations, and Standards Other WIPP Related Documents

  8. WIPP - Passive Institutional Controls (PICs) Images

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PICs Images Passive Institutional Controls PICs Images Permanent Markers | Images from Monument Survey Permanent Markers Earthen Berm The "big picture" Repository footprint Buried room Information center (surface center of berm) Small subsurface marker Large surface marker Marker at the Gnome Site (1/6 the size of a WIPP large surface marker) Early Concepts Back to top Images from Monument Survey Back to top

  9. WIPP Begins Underground Decontamination Activities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Yellow brattice cloth is suspended from the ceiling in this disposal room. It is rolled down to prevent air flow to the room. Brattice cloth also will serve as a barrier to decontaminate floors. WIPP UPDATE: March 13, 2015 WIPP Begins Underground Decontamination Activities Activities are underway in WIPP's underground facility to address the radioactive contamination that remains as a result of the February 14, 2014 event. Employees are using a modified piece of agricultural spraying equipment

  10. WIPP UPDATE: April 17, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    17, 2014 WIPP recovery team assembled The Department has finalized its federal and contractor recovery teams, which will coordinate efforts to implement corrective actions and allow the site to resume safe disposal operations. Mark Senderling has been named the federal WIPP recovery manager at the Department of Energy headquarters and will serve as the liaison with onsite WIPP recovery managers. Tom Teynor, who has more than 24 years of service in the federal government, will serve as the onsite

  11. WIPP UPDATE: July 22, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    22, 2014 Entries into WIPP underground resume Entries into the WIPP underground facility have resumed after being suspended for several weeks while workers changed air filters on the WIPP Ventilation System. The Accident Investigation Board (AIB) has completed their examination in most of the underground facility. However, Room 7 Panel 7 will be inaccessible to recovery workers until the AIB investigation is completed. On July 18, employees entered the underground facility to conduct

  12. WIPP UPDATE: October 3, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 2014 Progress continues in restoring WIPP underground More than half of the WIPP underground has now been surveyed and determined to be free of radiological contamination and additional progress was made this week to roll back additional zones into the Radiological Buffer Areas (RBA). Employees can enter the RBA without radiological Personal Protection Equipment (PPE). Radiological control technicians are entering the WIPP underground almost daily to complete contamination surveys and mapping

  13. WIPP Workers Perform Filter Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 10, 2015 WIPP Workers Perform Filter Replacement As recovery operations at the Waste Isolation Pilot Plant continue, increased work activity in the underground results in higher levels of airborne salt dust, increasing the frequency with which filters are replaced. Last week, workers performed a filter replacement on WIPP's Underground Ventilation System. WIPP's ventilation system has two filter units. Each unit has 84 separate filters arranges in four layers- moderate efficiency

  14. The WIPP Underground Ventilation System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2014 The WIPP Underground Ventilation System Since February, there has been considerable coverage about the WIPP Underground Ventilation System. On February 14, the ventilation system worked as designed, protecting human health and the environment. In normal exhaust mode, the ventilation system provides a continuous flow of fresh air to the underground tunnels and rooms that make up the disposal facility at WIPP. Air is supplied to the underground facility, located 2,150 feet below the

  15. Status Update on WIPP Restart

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Handling and Radiological Control personnel discuss a waste handling procedure during a recent Cold Operations training evolution. WIPP UPDATE: July 15, 2016 Status Update on WIPP Restart Workers at the Waste Isolation Pilot Plant (WIPP) are now well into the second month of Cold Operations at the facility and while significant progress has been made, much remains to be accomplished in order to meet the December 2016 projected timeframe for restarting transuranic waste operations. In

  16. WIPP RCRA Documents menu

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RCRA Documents Menu Permit Modifications Available for Public Comment Final Documents Draft Documents None currently available RCRA-Related Documents EEG Preliminary Comments on the Fundamental Bases of the Characterization Requirements for Disposal of Transuranic Waste at the Waste Isolation Pilot Plant and Findings and Recommendations of the Transuranic Waste Characterization Task Force Final Report EEG Response to NAS WIPP Committee Questions for May 19, 2003 Meeting Quality Assurance Program

  17. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Audit Report A-07-16 for INL/CCP RH Waste Characterization Activities dated November 22, 2006 Transmittal of the Certification Audit Report for SRS A-07-01 dated November 21, 2006 Annual Proposed Acceptable Knowledge Sufficiency Determination List Annual Report Submittals Submittal of Acceptable Knowledge Sufficiency Determination Notice of Submittal of a Dispute

  18. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Transmittal of the Certification Audit Report for the Advanced Mixed Waste Treatment Program, A-08-19 dated November 25, 2008 Transmittal of the Certification Audit Report for the Hanford TRU Program dated October 15, 2008 Transmittal of the Certification Audit Report for the Argonne National Laboratory-Central Characterization Project, Audit A-08-24 dated September 17,

  19. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Transmittal of the Recertification Audit Report for the Advanced Mixed Waste Treatment Project, Audit A-10-24, dated December 14, 2010 Transmittal of Carlsbad Field Office Final Audit Report A-10-23, Argonne National Laboratory Central Characterization Project for Remote Handled Waste Characterization dated October 14, 2010 Transmittal of Recertification Audit Report

  20. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Notification of Last Waste Emplacement and Intent to Commence Closure of the Waste Isolation Pilot Plant Hazardous Waste Disposal Unit Panel 5 dated March 30, 2011 Submittal of Final Audit Reports Transmittal of the Final Audit Report A-11-20, Argonne National Laboratory Central Characterization Project for Remote-Handled Waste Characterization dated October 26, 2011 Transmittal of the Recertification

  1. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Final Audit Report for the Argonne National Laboratory Central Characterization Project Recertification Audit A-12-16 dated December 19, 2012 Transmittal of the Final Audit Report for Recertification Audit A-12-14, INL Analytical Laboratories Utilizing the Central Characterization Project dated December 12, 2012 Transmittal of the Final Audit Report for Los Alamos

  2. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Notification of Panel 6 Closure and Final Waste Emplacement dated November 5, 2013 Submittal of Final Audit Reports Transmittal of the Final Audit Report for Recertification Audit A-14-01 of the Advanced Mixed Waste Treatment Project dated December 9, 2013 Final Audit Report for the Argonne National Laboratory Central Characterization Program Recertification Audit A-13-24 dated November 22, 2013

  3. Why WIPP (FINAL)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WHY WIPP? Waste Isolation Pilot Plant U.S. Department Of Energy Transuranic, or TRU waste began accumulating in the 1940s with the beginning of the nation!s nuclear defense program. As early as the 1950s, the National Academy of Sciences recommended deep disposal of long- lived TRU radioactive wastes in geologically stable formations, such as deep salt beds. Sound environmental practices and strict regulations require such wastes to be isolated to protect human health and the environment. Bedded

  4. WIPP - Joint Information Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Joint Information Center is located at 4021 National Parks Highway in Carlsbad, N.M. Joint Information Center In the unlikely event of an emergency, the WIPP Joint Information Center (JIC) serves as a central control point to coordinate multi-agency efforts to issue timely and accurate information to the public, news media and project employees. Emergency contact information: The public If the JIC is activated, members of the general public, including family members, may call (575) 234-7380

  5. WIPP Opportunities -CBFO Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Directional Map to WIPP CBFO Procurement The Carlsbad Field Office has no postings at this time. For additional posting information, please visit the Department of Energy's Environmental Management Consolidated Business Center site, located at http://www.emcbc.doe.gov/ Procurement contact information: Diane Snow Contracting Officer (575) 234-7452 Diane.Snow@cbfo.doe.gov Suzanne Hunt Contracting Officer (575) 234-7525 Suzanne.Hunt@cbfo.doe.gov Colleen Hirsch Contracting Officer (575) 234-7420

  6. WIPP UPDATE: July 11, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 11, 2014 Project Reach investigation continues in Room 7 WIPP employees are continuing their efforts to develop a system that allows workers to obtain additional video...

  7. WIPP UPDATE: June 18, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    bachelor's degree in metallurgical engineering from the South Dakota School of Mines and Technology. WIPP Fire Department Personnel Receive Medevac Training Recently, members of...

  8. WIPP UPDATE: May 28, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plans key for WIPP recovery effort The Accident Investigation Board issued a report in ... The Accident Investigation Board also issued an initial report related to the February 14 ...

  9. WIPP UPDATE: April 21, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    employees on replacing the high-efficiency particulate air (HEPA) filters - a crucial component of the WIPP Ventilation System. New filters are required to replace those that...

  10. WIPP UPDATE: May 7, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to filtration. Q: Does a backup electrical system exist that powers the mine's ventilation system or other systems? A: WIPP maintains diesel generators that provide...

  11. WIPP UPDATE: September 23, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    mark on Southeastern New Mexico, but the WIPP facility came away mostly unscathed with two brief partial power outages that delayed entries into the underground facility last week. ...

  12. WIPP UPDATE: August 26, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    26, 2014 Workers establish access to north experimental area Entry teams established access to the north experimental area of the WIPP underground facility this week. Geotechnical...

  13. WIPP UPDATE: June 13, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is being performed at night to reduce heat stress, was completed safely with excellent control of radiological contamination. WIPP's ventilation system has two filter units....

  14. WIPP UPDATE: April 9, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Today, WIPP crews began removing soot that accumulated in the Waste Hoist Tower and Control Room during the February 5 salt truck fire. They are using vacuums with...

  15. Backup Power Installed for WIPP EOC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Backup Power Installed for WIPP EOC The Waste Isolation Pilot Plant's (WIPP) Emergency Operations Center (EOC) will soon have guaranteed operation in the event of a power outage. ...

  16. WIPP Receives New Emergency Response Vehicle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 19, 2015 WIPP Receives New Emergency Response Vehicle WIPP recently placed a new emergency response vehicle into service. The new fire engine "Engine 24" will enhance...

  17. WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2007 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Transmittal of the Certification Audit Report A-07-14 of the AMWTP dated September 27, 2007 Transmittal of the Certification Audit Report A-07-03 of the ANL-CCP dated September 18, 2007 Final Audit Report A-07-24 of the SRS-CCP Battelle Columbus RH Waste dated September 6, 2007 Transmittal of the Certification Audit Report for the Hanford Site, Audit A-07-10 dated

  18. Appendix DATA Attachment A: WIPP Borehole Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A: WIPP Borehole Update United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Appendix DATA-2014 Attachment A: WIPP Borehole Update Table of Contents DATA-A-1.0 WIPP Boreholes DATA-A-2.0 Individual Well Reports DATA-A-2.1 New Wells Drilled Since the CRA-2009 DATA-A-2.2 Plugged Wells DATA-A-3.0 References List of Tables Table DATA-A- 1. Status of WIPP Boreholes December 2012 WIPP Table DATA-A-1. Status of WIPP Boreholes December 2012 WIPP

  19. Microsoft Word - WIPP Monitoring Program Ensures Worker Safety1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Isolation Pilot Plant (WIPP) Laboratory as a cause for reflection on the important role environmental monitoring has played during WIPP's 12-year history. In February, the WIPP...

  20. Texas Department of State Health Services - WIPP Program | Department...

    Office of Environmental Management (EM)

    Texas Department of State Health Services - WIPP Program Texas Department of State Health Services - WIPP Program PDF icon Texas Department of State Health Services - WIPP Program ...

  1. DOE Issues Safety Assessments for Diesel-Operated Equipment Underground at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 5, 2015 DOE Issues Safety Assessments for Diesel-Operated Equipment Underground at WIPP The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department of Energy's independent Office of Enterprise Assessments (EA), recently issued reports following reviews conducted on the WIPP Recovery Plan for Operating Diesel Equipment with available underground airflows and the Conduct of Maintenance and associated planned program enhancements. The onsite portions of the

  2. Sandia WIPP calibration traceability

    SciTech Connect (OSTI)

    Schuhen, M.D.; Dean, T.A.

    1996-05-01

    This report summarizes the work performed to establish calibration traceability for the instrumentation used by Sandia National Laboratories at the Waste Isolation Pilot Plant (WIPP) during testing from 1980-1985. Identifying the calibration traceability is an important part of establishing a pedigree for the data and is part of the qualification of existing data. In general, the requirement states that the calibration of Measuring and Test equipment must have a valid relationship to nationally recognized standards or the basis for the calibration must be documented. Sandia recognized that just establishing calibration traceability would not necessarily mean that all QA requirements were met during the certification of test instrumentation. To address this concern, the assessment was expanded to include various activities.

  3. CBFO and WIPP Commemorations for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The WIPP site ceremony also included the posting of colors by an employee volunteer color guard detail and the singing of the National Anthem by CBFO Assistant Manager for...

  4. WIPP Celebrates 14th Anniversary

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – The Waste Isolation Pilot Plant (WIPP) recently marked its 14th year as America’s only operational deep geologic repository for the disposal of radioactive waste.

  5. WIPP_Marks_12_Years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Marks 12 Years of Operations CARLSBAD, N.M., March 28, 2011 - On Saturday, March 26, 2011, ... It has now been 12 years since WIPP received its first shipment of transuranic (TRU) ...

  6. Safety Enhancements Continue at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    updates on WIPP recovery activities at 6:30 p.m. on Monday, August 11. Location: Leo Sweet Community Center, 1302 Mission Ave. Live streaming of the weekly meetings can be seen ...

  7. WIPP Receives 200th Shipment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    200 th Shipment CARLSBAD, N.M., April 18, 2001 - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) today received its 200 th shipment of defense- generated...

  8. WIPP Project Records Management Handbook

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Records Management Handbook provides the WIPP Project Records Management personnel with a tool to use to fulfill the requirements of the WIPP Records Program and direct their actions in the important area of records management. The handbook describes the various project areas involved in records management, and how they function. The handbook provides the requirements for Record Coordinators and Master Record Center (MRC) personnel to follow in the normal course of file management, records scheduling, records turnover, records disposition, and records retrieval. More importantly, the handbook provides a single reference which encompasses the procedures set fourth in DOE Order 1324.2A, Records Disposition'' ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities'' and DOE-AL 5700.6B, General Operations Quality Assurance.'' These documents dictate how an efficient system of records management will be achieved on the WIPP Project.

  9. WIPP UPDATE: January 21, 2016

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 21, 2016 Revised Schedule for Resumption of Operations in 2016 Announced The Department of Energy's Carlsbad Field Office (CBFO) approved the new integrated Performance Measurement Baseline (PMB) for the Waste Isolation Pilot Plant (WIPP). The new PMB integrates WIPP recovery activities, baseline operations and capital asset projects into a single plan with a schedule that identifies a path to resumption of waste emplacement operations. The new PMB considers potential risks that could

  10. WIPP UPDATE: November 19, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 19, 2014 Significant activities resume this week at WIPP Two functions that are vital to recovery operations resumed this week at the WIPP site. Over the weekend, crews resumed roof bolting operations necessary for ground control and continued safe access to many areas of the underground facility. Roof bolts, sometimes as long as 12 feet, are inserted into predrilled holes and tightened to required specifications to help secure the roof and walls of the access routes in the underground

  11. WIPP WASTE MINIMIZATION PROGRAM DESCRIPTION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NOV 2 3 2015 New Mexico Environment Department 2905 Rodeo Park Drive East, Building 1 Santa Fe, New Mexico 87505-6303 Subject: Transm ittal of the Waste Isolation Pilot Plant Project 2015 Waste Minimization Report, Permit Number NM4890139088-TSDF Dear Mr. Kieling: The purpose of this letter is to provide you with the Waste Isolation Pilot Plant (WIPP) Project 2015 Waste Minimization Report. This report, required by and prepared in accordance with the WIPP Hazardous Waste Facility Permit Part 2,

  12. WIPP | Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photos and Videos Videos Re-Entry and Other Video Mitigating Contamination - March 11, 2015 As seen in this video, WIPP teams are utilizing a fresh waster spray to mitigate the contamination in the WIPP underground. The water spray is applied to the walls of the mine causing the contamination to be trapped within the salt rock. Project Reach Video - January 26, 2015 Project Reach, a 90-foot composite boom equipped with high resolution video equipment, was specifically designed and built to

  13. 2004 WIPP Compliance Recertification Application

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2004 WIPP Compliance Recertification Application DOE/WIPP 04-3231 March 2004 Content of the CRA As required by Title 40 CFR, Parts 191 and 194, the 2004 Compliance Recertification Application addresses a wide range of topics. It incorporates portions of the first Compliance Certification Application (CCA) and provides updates in those areas where approved changes occurred. It also presents new data and associated analyses. In addition, the appliacation responds to specific requests from EPA for

  14. NNMCAB Correspondence 2013-04 (Letter WIPP) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 (Letter WIPP) NNMCAB Correspondence 2013-04 (Letter WIPP) Letter of thanks to WIPP facility for the outstanding tour of the Facility. Correspondence 2013-04 - Letter WIPP - November 11, 2013 (74.7

  15. Waste Isolation Pilot Plant (WIPP) Waste Information System (Public Access)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    The Waste Isolation Pilot Plant (WIPP) is a DOE facility located in the desert outside Carlsbad, New Mexico. Its mission is to safely dispose of defense-related transuranic radioactive waste. Disposal ôroomsö are carved out of the Permian Salt Formation deep below the desertÆs surface. The WIPP Waste Information Service (WWIS) was established in accordance with an Agreement between the United States Department of Energy and the New Mexico Environment Department, dated February 11, 2005, Docket Number HWB 04-07 (CO). The service provides information the containers emplaced at WIPP and the waste products they hold. The public may query by shipment number, location of waste stream or location of the container after it is placed at WIPP, date placed, and Haz Codes or other information about the waste stream profiles. For example, choosing the waste stream identified as ID-SDA-SLUDGE reveals that it may contain more than 20 chemical waste products, including arsenic, spent halogenated solvents, potassium cyanide, and chloroform. The system then tells you each numbered container that has this kind of sludge. Container data is available within 14 days after the containerÆs emplacement in the WIPP Repository.

  16. First Savannah River Shipment Arrives At WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First Savannah River Site Shipment Arrives At WIPP CARLSBAD, N.M., May 10, 2001 - The U.S. ... from DOE's Savannah River Site has arrived at the Waste Isolation Pilot Plant (WIPP). ...

  17. Appendix DATA Attachment A: WIPP Borehole Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlsbad Field Office Carlsbad, New Mexico Appendix DATA-2014 Attachment A: WIPP Borehole Update Table of Contents DATA-A-1.0 WIPP Boreholes DATA-A-2.0 Individual Well Reports ...

  18. Video Highlights Accomplishments, Path Forward for WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 17, 2016 Video Highlights Accomplishments, Path Forward for WIPP Participants at the Waste Management Symposium in Phoenix learned last week about the progress that has been made to recover the Department of Energy's Waste Isolation Pilot Plant (WIPP) and what steps remain to restart WIPP, the nation's only deep-geologic repository for defense transuranic waste later this year. As part of the update, WIPP's leadership team showed a short video that provides key elements of the recovery

  19. WIPP Receives Waste Characterized With Mobile System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Immediate Release WIPP Receives Waste Characterized With Mobile System CARLSBAD, N.M., April 12, 2002 - The first shipment of transuranic waste characterized by the Central Characterization Project arrived Saturday (April 6) at the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). The shipment came to WIPP from DOE's Savannah River Site in South Carolina. The shipment was the eighth to WIPP from the Savannah River Site, but the first under the newly approved Central

  20. Resuming Operations at WIPP | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WIPP Resuming Operations at WIPP Presentation from the 2015 DOE National Cleanup Workshop by Frank Marcinowski, Acting Associate Principal Deputy Assistant Secretary for The Office of Environmental Management. Resuming Operations at WIPP (1.21 MB) More Documents & Publications Chairs Meeting - April 2016 Chairs Meeting - September 2015 Chairs Meeting - April 2015

  1. WIPP - Idaho Impacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WIPP - Idaho Impacts WIPP - Idaho Impacts Presentation from the 2015 DOE National Cleanup Workshop by Jack Zimmerman, Deputy Manager for the Idaho Cleanup Project, DOE Idaho Operations Office. WIPP - Idaho Impacts (543.4 KB) More Documents & Publications EIS-0200-SA-03: Supplement Analysis EIS-0026-S2: Final Supplemental Environmental Impact Statement EIS-0026-SA-06: Supplement Analysis

  2. 2002 WIPP Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  3. WIPP UPDATE: June 2, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2014 Samples collected from WIPP underground On May 30, an entry team collected several samples from the WIPP underground, as part of the ongoing effort to determine the cause of the drum breach. Collections include magnesium oxide (MgO) samples taken near the breached drum in Room 7, Panel 7, and a sample of material believed to have originated from the breached drum. Additional MgO samples were also taken from various locations around the waste stacks. Workers also took video in in Room 7,

  4. WIPP_Panel_7_Approved

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Panel 7 Certified and Ready for Waste Disposal CARLSBAD, N.M., August 1, 2013 - In mid-July 2013, the New Mexico Environment Department (NMED) approved the use of Panel 7 for disposal of defense- related transuranic (TRU) waste at the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP). Approval by NMED for each underground waste disposal panel prior to use is required under the WIPP Hazardous Waste Facility Permit (Permit). A panel consists of seven waste disposal rooms and each room

  5. WIPP 2004 Site Environmental Report

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC, Washington Regulatory and Environmental Services

    2005-09-30

    The mission of Waste Isolation Pilot Plant (WIPP) is to safely and permanently dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States (U.S.). In 2004, 8,839 cubic meters (m3) of TRU waste were emplaced at WIPP. From the first receipt of waste in March 1999 through the end of 2004, 25,809 m3 of TRU waste had been emplaced at WIPP. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of WIPP environmental resources. DOE Order 450.1, Environmental Protection Program; DOE Order 231.1A, Environment, Safety, and Health Reporting; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2004 Site Environmental Report (SER) summarizes environmental data from 2004 that characterize environmental management performance and demonstrate compliance with applicable federal and state regulations. This report was prepared in accordance with DOE Order 231.1A, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2004 (DOE, 2005). The order and the guidance require that DOE facilities submit an annual SER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) further requires that the SER be provided to the New Mexico Environment Department (NMED).

  6. DOE Announces Plans for WIPP | National Nuclear Security Administration |

    National Nuclear Security Administration (NNSA)

    (NNSA) Announces Plans for WIPP DOE Announces Plans for WIPP Carlsbad, NM The Department of Energy announces that it will dispose of defense-generated transuranic waste at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico

  7. Rocky Flats resumes shipments to WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rocky Flats Resumes Shipments to WIPP CARLSBAD, N.M., March 11, 2000 - The U.S. Department of Energy (DOE) has resumed transuranic radioactive waste shipments from DOE's Rocky Flats Environmental Technology Site (RFETS) to the Waste Isolation Pilot Plant (WIPP). A shipment consisting of 28 drums of transuranic waste today arrived safely at WIPP at 5:07 p.m. (Mountain Standard Time). The truck, carrying two TRUPACT-II (Transuranic Packaging Transporter Model II) shipping containers, departed

  8. Department of Energy Releases WIPP Recovery Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Releases WIPP Recovery Plan Washington, D.C. - Today, the Department of Energy (DOE) released the Waste Isolation Pilot Plant (WIPP) Recovery Plan, outlining the necessary steps to resume operations at the transuranic waste disposal site outside of Carlsbad, N.M. WIPP operations were suspended following an underground truck fire and a radiological release earlier this year. "Safety is our top priority," said Mark Whitney, Acting Assistant Secretary for DOE's Office

  9. WIPP - Freedom of Information Act (FOIA)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Freedom of Information Act (FOIA) Mission Statement The mission of the Carlsbad Field Office (CBFO) is to protect human health and the environment by operating the Waste Isolation Pilot Plant (WIPP) for the safe disposal of Transuranic (TRU) waste and by establishing an effective system for management of TRU waste from generation to disposal. The following types or category of records are available at the WIPP Site. DOE contracts, amendments Waste Isolation Pilot Plant (WIPP) mission,

  10. WIPP DNFSB Brief Rev 5

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Update National TRU Program Improvements Todd Shrader, CBFO Manager Jeff Carswell, Acting Assistant Manager Office of NTP Casey Gadbury, Director Office of Program Management J. R. Stroble, Director NTP Compliance Division August 11, 2016 www.energy.gov/EM 2 Discussion Topics * Key Concepts Ø Governing Documents Ø Data Collection Ø Verification Ø Tracking/Auditing * Program Enhancements Ø Why will future event be prevented? * Roles and Responsibilities * Walk through Roadmap * Way

  11. WIPP UPDATE: June 10, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0, 2014 Filter replacement activities begin Teams have started work to replace filters in the first of two filter banks that were affected by the underground fire and radiological event that occurred in the WIPP underground. Employees completed the fogging process on June 7 in preparation for the actual replacement. This process involves spraying a fixative that adheres contamination on the filters and reduces the chances of airborne radioactive contamination during the change-out. Community

  12. WIPP UPDATE: June 17, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 17, 2014 Filter replacement activities progressing as planned Crews are making progress replacing the filters for WIPP's Underground Ventilation System. The system has two filtration units. Each unit has 84 filters in four layers- moderate efficiency filters, high efficiency filters, and two layers of High Efficiency Particulate Air (HEPA) filters After successfully replacing the moderate and high efficiency filters in the first filtration unit, crews restored air flow Monday in preparation

  13. WIPP UPDATE: March 5, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 5, 2015 MOD filter replacements completed successfully Replacement of the moderate efficiency (MOD) pre-filters that are part of the High Efficiency Particulate Air (HEPA) filtration system for the WIPP underground ventillation system was successfully completed on March 4, 2015. Filter changes are anticipated and necessary when MOD filters begin to show signs of reduced airflow, due primarily to salt dust buildup. The filter changeout is a well planned and controlled work activivity

  14. WIPP UPDATE: May 19, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19, 2014 Labs investigate drum content Last week a photograph showed a waste container with a cracked lid and heat damage, providing further evidence of a significant heat event in WIPP's Room 7 of Panel 7. The investigation into the exact cause of the release is ongoing. Los Alamos and Savannah River National Laboratories are testing the waste stream's chemical and radiological content and looking at possible scenarios for what might have caused a reaction in the drum. Waste containers from the

  15. WIPP WASTE MINIMIZATION PROGRAM DESCRIPTION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlsbad, New Mexico 8822 1 NOV 2 3 2011 Mr. John Kieling , Acting Bureau Chief Hazardous Waste Bureau New Mexico Environme nt Department 2905 Rodeo Park Drive East, Building 1 Santa Fe, New Mexico 87505-6303 Subject: Transmittal of the Waste Isolation Pilot Plant Annual Waste Minimization Report Dear Mr. Kieling: This letter provides the submittal of the Waste Isolation Pilot Plant Annual Waste Minimization Report. This report is required by and has bee n prepared in accordance with the WIPP

  16. Appendix MON: WIPP Monitoring Programs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MON-2014 WIPP Monitoring Programs United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix MON-2014 Table of Contents MON-1.0 Introduction MON-1.1 Compliance Monitoring Program MON-1.2 Preclosure and Postclosure Monitoring MON-1.3 Monitoring Assessment MON-1.4 Appendix Summary MON-2.0 Compliance Monitoring Program Requirements MON-2.1 Compliance Certification/Recertification MON-3.0 Preclosure

  17. Microsoft Word - WIPP Update 3 17 14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... at Oak Ridge National Laboratory, brought radiological cleanup expertise to WIPP. MJW Corporation provided experts in occupational and radiation medicine and health physics. ...

  18. WIPP Receives 500th Waste Shipment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    500 th Waste Shipment CARLSBAD, N.M., January 7, 2002 - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) reached a new milestone Saturday with the safe arrival of its 500 th shipment of transuranic waste. The 500 th shipment arrived at WIPP at 6:38 p.m. Saturday from DOE's Rocky Flats Environmental Technology Site in Colorado. It was the 282 nd shipment to WIPP from Rocky Flats - one of five DOE sites sending defense-generated radioactive waste to WIPP for permanent

  19. WIPP Attracts International Interest | Department of Energy

    Office of Environmental Management (EM)

    ... salt taken from the Morsleben mine in Germany. WIPP Shares Expertise with Salt Club Members Participants in the workshops in Germany toured Asse II, one of Germany's two ...

  20. WIPP First Responders Earn Advanced Training Certifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Isolation Pilot Plant continue to move in a positive direction. As part of increased emergency response capabilities, the WIPP Fire Department and Emergency Response Team are...

  1. DOE Awards WIPP Independent Oversight Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Columbia, Md., to form the "Alliance for Research, Evaluation, and Advancement of WIPP Environmental Science and Technology" (AREA WEST) for this contract. AREA WEST will...

  2. WIPP Hosts All-Hazards Planning Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 20, 2015 WIPP hosted the first annual All- Hazards, Offsite Interface Briefing ... Center (CEMRC) and URENCO, a uranium enrichment company located near Eunice, New Mexico. ...

  3. DOE Issues Request for Information for Potential WIPP Transportation...

    Office of Environmental Management (EM)

    Potential WIPP Transportation Services Procurement DOE Issues Request for Information for Potential WIPP Transportation Services Procurement February 4, 2016 - 1:00pm Addthis Media ...

  4. Microsoft Word - WIPP Update 9_17_15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 17, 2015 WIPP Conducts Annual Full Scale Emergency Response Exercise On September 16, the Waste Isolation Pilot Plant (WIPP) held its annual full-scale exercise to...

  5. Summary of Waste Isolation Pilot Plant (WIPP) Hypotheses | Department...

    Office of Environmental Management (EM)

    Summary of Waste Isolation Pilot Plant (WIPP) Hypotheses Summary of Waste Isolation Pilot Plant (WIPP) Hypotheses This document was used to determine facts and conditions during ...

  6. WIPP Receives Green Zia Award for Environmental Excellence |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Green Zia Award for Environmental Excellence WIPP Receives Green Zia Award for ... Plant (WIPP), the U.S. Department of Energy (DOE) facility known as the nation's only ...

  7. Los Alamos National Laboratory ships last of high-activity drums to WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ships last ff high-activity drums to WIPP Los Alamos National Laboratory ships last of high-activity drums to WIPP The November shipment was the final delivery this year to the Carlsbad plant, which is scheduled to undergo facility maintenance through mid-January. November 25, 2008 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy

  8. Successes and Experiences of the WIPP Project

    SciTech Connect (OSTI)

    CHU,MARGARET S. Y.; WEART,WENDELL D.

    2000-09-06

    In May 1998, the US Environmental Agency (EPA) certified the US Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) as being in compliance with all of the applicable regulations governing the permanent disposal of spent nuclear fuel, high-level waste, and transuranic radioactive waste. The WIPP, a transuranic waste repository, is the first deep geologic repository in the US to have successfully demonstrated regulatory compliance with long-term radioactive waste disposal regulations and be certified to receive wastes. Many lessons were learned throughout the 25-year history of the WIPP--from site selection to the ultimate successful certification. The experiences and lessons learned from the WIPP may be of general interest to other repository programs in the world. The lessons learned include all facets of a repository program: programmatic, managerial, regulatory, technical, and social. This paper addresses critical issues that arose during the 25 years of WIPP history and how they influenced the program.

  9. 2016 WIPP Stakeholder Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 WIPP Stakeholder Information Documents Closure of Underground Hazardous Waste Disposal Unit Submittal of Final Audit Reports Transmittal of Final Report for CBFO Audit A-16-19 of the LANL/CCP dated August 9, 2016 Transmittal of Final Report for CBFO Audit A-16-15 of the Oak Ridge National Laboratory/Central Characterization Program dated July 26, 2016 Interim and Final Audit Report for Hanford Site Central Characterization Program Recertification Audit A-16-11 dated June 27, 2016 Transmittal

  10. WIPP News Release Archives Index

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP News Release Archives 2006 News Releases 2005 News Releases 2004 News Releases 2003 News Releases 2002 News Releases 2001 News Releases 2000 News Releases 1999 News Releases 1998 News Releases 1997 News Releases 1996 News Releases 1995 News Releases Back to 2007 News Releases If you have any questions regarding the above, contact: Dennis Hurtt, Team Leader Office of Public Affairs DOE, Carlsbad Field Office P.O. Box 3090 Carlsbad, NM 88221-3090 Phone: 505/234-7327 Fax: 505/234-7025 E-mail:

  11. WIPP - Passive Institutional Controls (PICs)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The U.S. Department of Energy has developed a program for the development of Passive Institutional Controls to alert future generations to the potential hazards of intersecting the Waste Isolation Pilot Plant (WIPP) repository. These controls are required by U.S. Environmental Protection Agency [Title 40 CFR, Sections 191.14 and 194.43]. The purpose of a passive control, or a PIC, is to indicate the location of the repository and to convey the dangers associated with human exposure to the

  12. WIPP Documents - National TRU Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Label 1 Content 1 Label 2 Content 2 Large file size alert This symbol means the document may be a large file size. National TRU Program Annual Transuranic Waste Inventory Report - 2015 DOE/TRU-15-3425 Rev 0 Effective date 12/15 The information presented in the ATWIR - 2015 serves as a current baseline of the TRU waste inventory for potential disposal at WIPP and may be considered in future Compliance Recertification Applications. The TRU Waste Inventory Profile Reports (Appendices A and B)

  13. WIPP Weatherization: Common Errors and Innovative Solutions Presentation

    Broader source: Energy.gov [DOE]

    This presentation contains information on WIPP Weatherization: Common Errors and Innovative Solutions.

  14. EEG operational radiation surveillance of the WIPP Project during 2001

    SciTech Connect (OSTI)

    Gray, Donald H.; Ballard, Sally C.; Channell, James K.

    2002-12-31

    The Environmental Evaluation Group (EEG) has measured the levels of 241Am, 238Pu, 239/240Pu, 137Cs, and 90Sr in samples of air and water collected at and in the vicinity of the U. S. Department of Energys (DOE) Waste Isolation Pilot Plant (WIPP) during 2001. The WIPP received the first shipment of waste in March 1999 and became operational at that time. The EEG has compared these levels to those measured in the preoperational phase, prior to receipt of waste, as well as to the results of other monitoring organizations and to the U. S. Environmental Protection Agency (EPA) dose standards established for the WIPP at 40 CFR 191, Subpart A, and, by an agreement between the DOE and the EPA, at 40 CFR 61, Subpart H. Based on these analyses and applying a t test for significant differences for normally-distributed data (Taylor 1987), or analysis of variance (ANOVA) for non-normal data, the EEG concludes that: 1. Three measurements of radionuclides in the environment around WIPP during 2001 were different from the preoperational baseline levels. Only two of these 241Am in both the Loving and WIPP3 low volume air sampler (LVAS) samples, first quarter and second quarter, respectively exceeded the minimum detectable activity (MDA). These measurements were carefully investigated, but no clearly assignable cause was discovered. No measurements of 241Am in effluent air from the WIPP underground exceeded the action level, and converting the highest LVAS measured concentration to radiation dose yielded a committed dose of much less than 1% of the limit allowable under the EPA standard. 2. Comparison of the EEGs 2001 results with those of other monitoring organizations revealed two sets of measurements which did not agree. One set 241Am in surface water was found to be in agreement with the corresponding EEG baseline. The other 90Sr in groundwater was probably a result

  15. WIPP Takes Second in Mine Rescue Competition | Department of Energy

    Office of Environmental Management (EM)

    Takes Second in Mine Rescue Competition WIPP Takes Second in Mine Rescue Competition June 30, 2014 - 12:00pm Addthis WIPP Mine Rescue Red Team members’ actions are evaluated during a simulated mine rescue disaster. WIPP Mine Rescue Red Team members' actions are evaluated during a simulated mine rescue disaster. WIPP mine rescue team members simulate the proper first aid response to stabilize injuries. WIPP mine rescue team members simulate the proper first aid response to stabilize

  16. Microsoft Word - WIPP Update 7_5_16 .docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Several members of the WIPP Mine Rescue Team simulate rescuing two injured underground workers during last week's emergency exercise. WIPP UPDATE: July 6, 2016 Annual Exercise Tests WIPP Emergency Response Capabilities The Waste Isolation Pilot Plant (WIPP) recently held its annual full-scale exercise to demonstrate employees' overall capability to recognize, respond, and mitigate any emergency situation that might occur at WIPP. On June 22, more than 100 external evaluators assessed the

  17. WIPP Mine Rescue Team Wins Colorado Competition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Colorado Competition CARLSBAD, N.M., July 11, 2001 - The Silver Mine Rescue Team from the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) placed first in the recent Western Regional Mine Rescue Competition. It was the first victory by a WIPP team in this competition in five years. The Colorado State Mine Inspector's Office, in conjunction with the Colorado School of Mines, hosted the Western Regional, June 12-14 in Golden, Colorado. The WIPP Silver Team defeated seven teams,

  18. WIPP receives 9,000th shipment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP receives 9,000th shipment CARLSBAD, N.M., October 7, 2010 � The U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) received its 9,000th shipment of transuranic (TRU) waste on Tuesday evening, marking an important milestone in the Department�s mission to clean up the legacy of the cold war. �This significant milestone represents our commitment to the nation to clean up the defense legacy TRU waste footprint,� said Interim Acting CBFO Manager Ed Ziemianski. �The WIPP

  19. WIPP Status Report Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Report Waste Isolation Pilot Plant Page 1 of 3 Report Statistics Report Version: 2.4.3 WDS Instance: prd05.wipp.carlsbad.nm.us Generated on: June 24, 2015 7:29 AM Generated by: REPORT, WEEKLY Total Pages: 3 Selection Criteria Reporting Date (As Of): 06/20/2015 Include Detail: No WIPP Status Report REPORT, WEEKLY June 24, 2015 7:29 AM Page 2 of 3 Waste Isolation Pilot Plant As of 06/20/15 SHIPMENTS and VOLUME RECEIVED AT WIPP Site Last Week (06/07/15- 06/13/15) Current Week (06/14/15-

  20. Microsoft Word - WIPP Training Program.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EDUCATION PROGRAM W a s t e I s o l a t i o n P i l o t P l a n t U . S . D e p a r t m e n t O f E n e r g y The Waste Isolation Pilot Plant's (WIPP) has trained more than 32,000 emergency response professionals along WIPP routes since 1988. The training courses sponsored by the U. S. Department of Energy (DOE) focuses on all emergency responders who may potentially respond to accidents involving WIPP waste shipments. The following classes address incident command, caring for accident victims

  1. Shoshone-Bannock Tribes Officials Visit WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Shoshone-Bannock Tribes Officials Visiting Carlsbad for WIPP Training CARLSBAD, N.M., June 12, 2012- Photo caption: Two Shoshone-Bannock Tribes (SBT) officials are visiting the Department of Energy (DOE) Carlsbad Field Office (CBFO) and Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, June 12-13, 2012, for emergency response training provided by WIPP. They were greeted on arrival at the CBFO, which has a cooperative agreement with the SBT, in-town offices and paused for a photo.

  2. DOE Finalizes WIPP Fire Investigation Report

    Broader source: Energy.gov [DOE]

    Washington, DC – Today, the Office of Environmental Management (EM) released the accident investigation report for the underground mine fire involving a salt haul truck at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico.

  3. WIPP Mine Rescue Team Wins, Retires Trophy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    third. Kevin Cummins of IMC-Kalium won first place in the benchman's competition. Joe Baca of the WIPP Blue Team won second place. Mine Rescue teams have been participating in...

  4. WIPP Update 5_09_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    To date, WIPP has determined that the radiological release was not the result of a partial roof collapse in the mine or a bolt falling from the roof and puncturing a container. ...

  5. MODIFICATIONS TO THE WIPP PANEL CLOSURE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... in Panel 4 than in Panel 3. Please compare the waste inventories in Panels 3 and 4 ... to WIPP." This category consists of high-wattage (i.e., high decay heat) payload ...

  6. Microsoft Word - DOE Approves WIPP Workforce Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 Media Contact: Bradley Bugger U.S. DOE Carlsbad Field Office (575) 234-7309 www.wipp.energy.gov...

  7. Microsoft Word - WIPP Update 3_ 21_ 14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 Media Contact: Bradley Bugger U.S. DOE Carlsbad Field Office (575) 234-7309 www.wipp.energy.gov - 2 -...

  8. WIPP Interim Ventilation System Continues to Progress

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    being installed at the Waste Isolation Pilot Plant (WIPP) continues to move forward. Concrete pads were poured and both the power distribution center and the two-fanfilter units...

  9. WIPP AT WORK | Department of Energy

    Office of Environmental Management (EM)

    February 1, 2010 - 12:00pm Addthis Carlsbad, NM - Transuranic (TRU) waste cleanup efforts are underway across the DOE complex, as the Waste Isolation Pilot Plant (WIPP) wraps up ...

  10. DOE Announces New WIPP Tour Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is being developed for visitor viewing at the Skeen-Whitlock Building, 4021 National Parks Highway in Carlsbad. Anyone interested in scheduling a tour of WIPP is encouraged to...

  11. WIPP Receives Top Mine Safety Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Top Mine Safety Award CARLSBAD, N.M., September 18, 2013 - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) received top safety honors from the New Mexico...

  12. Secretary of Energy Ernest Moniz visits WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2014 Secretary of Energy Ernest Moniz visits WIPP This week, Energy Secretary Ernest Moniz visited Carlsbad to tour the site and see firsthand the recovery efforts underway at ...

  13. False Radiological Alarm in WIPP Underground

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    At approximately 7:40 a.m. Mountain Time today, a portable continuous air monitor (CAM) alarm activated in the Waste Isolation Pilot Plant (WIPP) underground. Shortly after...

  14. Students gain work experience at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Students Gain Work Experience at WIPP CARLSBAD, N.M., January 10, 2000 -- Students from two Eddy County high schools are gaining valuable experience by spending time with employees...

  15. WIPP Satellite Tracking System Relocates to Carlsbad

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Immediate Release WIPP Satellite Tracking System Relocates to Carlsbad Carlsbad, N.M., December 7, 2005 - The U.S. Department of Energy's (DOE) Carlsbad Field Office has announced that effective December 2, the DOE Transportation Tracking and Communication System (TRANSCOM) is fully staffed and operational in Carlsbad, N.M. The TRANSCOM system, previously based in Albuquerque, N.M, is used to track transuranic waste shipments to the Waste Isolation Plant (WIPP) near Carlsbad and other DOE

  16. WIPP TRU TeamWorks - About Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us TRU TeamWorks is an e-newsletter published for the Waste Isolation Pilot Plant team. Mission Statement: To provide WIPP employees and stakeholders with relevant, timely information that highlights project accomplishments, incorporates messages related to project goals and advances the WIPP viewpoint. Submissions: Have an article suggestion or submittal? Send an e-mail to the TRU TeamWorks staff.

  17. Westinghouse TRU Solutions LLC Assumes WIPP Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse TRU Solutions LLC Assumes WIPP Operations CARLSBAD, N.M., February 1, 2001 - Westinghouse TRU Solutions LLC (WTS) today assumed responsibility for the management and operation of the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). Heading up the new management team is Henry F. "Hank" Herrera, President and General Manager of WTS. A retired U.S. Navy Rear Admiral, Herrera has more than 27 years of nuclear operations and radioactive waste management

  18. Westinghouse hires new attorney at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hires New Attorney at WIPP Carlsbad, N.M., February 10, 2000 - The Westinghouse Waste Isolation Division today announced that Raeburn Josey has joined the Westinghouse legal staff at the Waste Isolation Pilot Plant (WIPP). Prior to joining Westinghouse, Josey was in private practice in Atlanta. From 1980 to 1985 he was employed by the Institute of Nuclear Power Operations (INPO), a utility- funded organization. Working with the organization almost from its inception, Josey helped INPO in

  19. WIPP Documents - Hazardous Waste Facility Permit (RCRA)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hazardous Waste Facility Permit The WIPP Hazardous Waste Facility Permit (HWFP) effective April 15, 2011 WIPP Hazardous Waste Facility Permit Authorizes the U.S. Department of Energy to manage, store, and dispose of contact-handled and remote-handled transuranic mixed waste at the Waste Isolation Pilot Plant. Mixed waste contains radioactive and chemically hazardous components. Information Repository Documents related to the Hazardous Waste Facility Permit

  20. Appendices - 2004 WIPP Compliance Recertification Application

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Please note that these document are quite large in size and have been split into smaller sections. To navigate between sections, use hyperlinks as indicated by red boxes or blue text in the Table of Contents for each section. There are also hyperlinks at the top and bottom of each section. 2004 WIPP Compliance Recertification Application - Appendices DOE/WIPP 04-3231 March 2004 CRA - Appendices Appendix AUD - 2004 Appendix BARRIERS Appendix DATA Appendix MON-2004 Appendix MON-2004 - Attachment A

  1. 2004 WIPP Compliance Recertification Application - INDEX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Back to Content Description Please note that these documents are quite large in size and have been split into smaller sections. To navigate between sections, use hyperlinks as indicated by red boxes or blue text in the Table of Contents for each section. There are also hyperlinks at the top and bottom of each section. 2004 WIPP Compliance Recertification Application - Main Volume DOE/WIPP 04-3231 March 2004 CRA - Main Letter to EPA Administrator Leavitt, from DOE Secretary Abraham Executive

  2. DE-SOL-0002555 WIPP Solicitation J-26 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS SECTION J ATTACHMENT G: SUMMARY OF CONTRACT DELIVERABLES DE-SOL-0002555 WIPP Solicitation J-27 SUMMARY OF CONTRACT DELIVERABLES Deliverable Reference Deliverable DOE Action Deliverable Due Date 1 1. C.3.1.5 Ten Year Site Plan Approval Within 6 months of written notice to proceed, updated annually 2. C.3.1.5 Maintenance Plan (including Nuclear Maintenance Management Plan) Approval Within 6 months of written notice to proceed, updated

  3. Overview of actinide chemistry in the WIPP

    SciTech Connect (OSTI)

    Borkowski, Marian; Lucchini, Jean - Francois; Richmann, Michael K; Reed, Donald T; Khaing, Hnin; Swanson, Juliet

    2009-01-01

    The year 2009 celebrates 10 years of safe operations at the Waste Isolation Pilot Plant (WIPP), the only nuclear waste repository designated to dispose defense-related transuranic (TRU) waste in the United States. Many elements contributed to the success of this one-of-the-kind facility. One of the most important of these is the chemistry of the actinides under WIPP repository conditions. A reliable understanding of the potential release of actinides from the site to the accessible environment is important to the WIPP performance assessment (PA). The environmental chemistry of the major actinides disposed at the WIPP continues to be investigated as part of the ongoing recertification efforts of the WIPP project. This presentation provides an overview of the actinide chemistry for the WIPP repository conditions. The WIPP is a salt-based repository; therefore, the inflow of brine into the repository is minimized, due to the natural tendency of excavated salt to re-seal. Reducing anoxic conditions are expected in WIPP because of microbial activity and metal corrosion processes that consume the oxygen initially present. Should brine be introduced through an intrusion scenario, these same processes will re-establish reducing conditions. In the case of an intrusion scenario involving brine, the solubilization of actinides in brine is considered as a potential source of release to the accessible environment. The following key factors establish the concentrations of dissolved actinides under subsurface conditions: (1) Redox chemistry - The solubility of reduced actinides (III and IV oxidation states) is known to be significantly lower than the oxidized forms (V and/or VI oxidation states). In this context, the reducing conditions in the WIPP and the strong coupling of the chemistry for reduced metals and microbiological processes with actinides are important. (2) Complexation - For the anoxic, reducing and mildly basic brine systems in the WIPP, the most important

  4. Assessment of the potential for karst in the Rustler Formation at the WIPP site.

    SciTech Connect (OSTI)

    Lorenz, John Clay

    2006-01-01

    . Several surficial depressions at WIPP, suggested to be sinkholes, do not have enough catchment area to form a sinkhole, and holes drilled to investigate the subsurface strata do not support a sinkhole interpretation. Surface drainage across the WIPP site is poorly developed because it has been disrupted by migrating sand dunes and because precipitation is not focused by defined catchment areas in this region of low precipitation and low-dip bedding, not because it has been captured by sinkholes. There are no known points of discharge from the Rustler Formation at WIPP that would indicate the presence of a subsurface karst drainage system. The existing drillholes across the WIPP site, though small in diameter, are sufficient to assess the probability of karst development along the horizontal fractures that are common in the Rustler Formation, and the area of investigation has been augmented significantly by the mapping of four large-diameter shafts excavated into the WIPP repository. The general absence of dissolution, karsting, and related conduits is corroborated by the pumping tests which have interrogated large volumes of the Rustler Formation between drillholes. Diffusion calculations suggest that separate isotopic signatures for the water found in the fractures and the water found in the pores of the matrix rock between fractures are unlikely, thus the isotopic evidence for ancient Rustler formation waters is valid. Geophysical techniques show a number of anomalies, but the anomalies do not overlap to portray consistent and mutually supporting patterns that can be definitively related to karst void space at any given location. The coincidence of the Culebra and Magenta potentiometric heads between Nash Draw and the WIPP site is the inevitable intersection of two non-parallel surfaces rather than an indication of karst-related hydraulic communication between the two units. The proponents of karst in the Rustler Formation at the WIPP site tend to mix data, to take data

  5. Sampling Report for May-June, 2014 WIPP Samples

    Office of Environmental Management (EM)

    UNCLASSIFIED iii Table of Contents WIPP Panel 7 Sampling May-June, 2014 ... 15 LLNL-TR-667001 Section 1 WIPP Panel 7 Sampling May-June, 2014 1. Summary of ...

  6. Sampling Report for August 15, 2014 WIPP Samples

    Office of Environmental Management (EM)

    X X X X X Sampling Report for August 15, 2014 WIPP Samples UNCLASSIFIED Forensic Science Center December 19, 2014 Sampling Report for August 15 2014 WIPP Samples Lawrence ...

  7. WIPP Completes State of the Art Emergency Operations Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Participants use the new EOC during a recent emergency response drill. The new state-of-the-art EOC improves WIPP's emergency management capabilities. WIPP UPDATE: October 15, 2015...

  8. Microsoft Word - WIPP Water Line _2_ _2_ _2_

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Announces the Transfer of the WIPP Water Line to the City of Carlsbad CARLSBAD, N.M., June ... the DOE-owned Waste Isolation Pilot Plant (WIPP) water line to the city of Carlsbad. ...

  9. WIPP Recertification - An Environmental Evaluation Group Perspective

    SciTech Connect (OSTI)

    Allen, L. E.; Silva, M. K.

    2003-02-25

    The Waste Isolation Pilot Plant (WIPP), a repository for defense transuranic (TRU) waste, was built and is operated by the U.S. Department of Energy (DOE). The WIPP Land Withdrawal Act (LWA) required initial certification of compliance of the WIPP by the U.S. Environmental Protection Agency (EPA). In addition, a recertification decision is required by the LWA every five years, dated from the initial receipt of TRU waste. The first TRU waste shipment arrived at the WIPP on March 26, 1999, and therefore the first recertification application is due from DOE to EPA by March 25, 2004. The Environmental Evaluation Group (EEG) provides technical oversight of the WIPP project on behalf of the State of New Mexico. The EEG considers the first recertification as a precedent setting event. Therefore, the EEG began the identification of recertification issues immediately following the initial certification decision. These issues have evolved since that time, based on discussions with the DOE and EEG's understanding of DOE's ongoing research. Performance assessment is required by the EPA certification and its results are needed to determine whether the facility remains in compliance at the time of the recertification application. The DOE must submit periodic change reports to the EPA which summarize activities and conditions that differ from the compliance application. Also, the EPA may request additional information from the DOE that may pertain to continued compliance. These changes and new information must be considered for recertification performance assessment.

  10. New Mexico Environment Department Presents WIPP Its Highest Recognition for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Excellence | Department of Energy Environment Department Presents WIPP Its Highest Recognition for Environmental Excellence New Mexico Environment Department Presents WIPP Its Highest Recognition for Environmental Excellence April 30, 2013 - 12:00pm Addthis Media Contact Deb Gill, (575) 234-7270 U.S. DOE Carlsbad Field Office www.wipp.energy.gov CARLSBAD, N.M., April 30, 2013 - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) was recognized by the New

  11. Leveraging Resources for Weatherization Innovation Pilot Projects (WIPP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presentation | Department of Energy Weatherization Innovation Pilot Projects (WIPP) Presentation Leveraging Resources for Weatherization Innovation Pilot Projects (WIPP) Presentation As a WIPP agency, reporting leveraged dollars is paramount to your entity's success. This webinar will review the WIPP definition and policy, discuss leveraging items you may not have thought possible to claim, and show you ways to calculate accrued leveraged dollars. leveraging_resources_webinar.pdf (2.09 MB)

  12. Waste Isolation Pilot Plant (WIPP) Waste Information System (Public Access)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Container data is available within 14 days after the containers emplacement in the WIPP Repository.

  13. Microsoft Word - WIPP Update 063016 - WAC and Hold.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP UPDATE: June 30, 2016 New Waste Acceptance Criteria Released On June 27 the Carlsbad Field Office (CBFO) issued the revised Waste Acceptance Criteria (WAC) for the Waste Isolation Pilot Plant (WIPP) to transuranic (TRU) waste generator site programs across the DOE complex. Changes in WAC criteria for WIPP are being made in response to findings of the Accident Investigation Board's report on the radiological release at WIPP in February 2014. The WAC Revision 8 goes into effect on July 5 and

  14. Microsoft Word - WIPP Update 11_12_15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Emergency Operations Center participate in a drill, simulating an emergency occurrence at the WIPP Facility. WIPP UPDATE: November 12, 2015 WIPP Conducts Limited Scope Performance Tests On November 3-4, the Waste Isolation Pilot Plant (WIPP) Emergency Operations Center staff conducted a series of Limited Scope Performance Tests (LSPT) designed to evaluate the readiness of the Emergency Response Organization (ERO) and the Emergency Operations Center. A series of four exercises were conducted

  15. Microsoft Word - WIPP Update 9_30_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 30, 2014 U.S. Department of Energy releases WIPP recovery plan Today the U.S. Department of Energy (DOE) released the WIPP Recovery Plan, which outlines the key activities, management approach and strategies that will be used to meet the current goal of resuming operations by the first quarter of calendar year 2016. The plan also includes the projected schedule and costs associated with resumption of waste emplacement at WIPP. The Department is committed to resuming WIPP operations as

  16. Microsoft PowerPoint - WIPP Recovery Workshop_Final

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Recovery Workshop U.S. Department of Energy Waste Isolation Pilot Plant January 14, 2015 1 Agenda * Introduction and Workshop Objective * WIPP Recovery Approach * Interim Performance Measurement Baseline * WIPP Recovery Project Summary Level Schedule * Questions and Answers 2 Introductions and Workshop Objective * Introductions * The objective of this workshop is to provide a forum for a detailed discussion of the WIPP Recovery Project Interim Baseline and to address stakeholder questions

  17. WIPP Receives First Shipment | National Nuclear Security Administration |

    National Nuclear Security Administration (NNSA)

    (NNSA) WIPP Receives First Shipment WIPP Receives First Shipment Carlsbad, NM After more than two decades of political, legal, and bureaucratic delays, the first truckload of radioactive waste from Los Alamos National Laboratory arrives at the DOE Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico, 26 miles east of Carlsbad

  18. Microsoft Word - WIPP Transportation Exhibit.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    immediate release New WIPP Transportation Exhibit Opens at the National Museum of Nuclear Science & History ALBUQUERQUE, N.M., November 2, 2011 - The National Museum of Nuclear Science & History will debut an exhibit on November 5, 2011, that features the transportation system used by the U.S. Department of Energy (DOE) to ship transuranic (TRU) waste from generator sites nationwide to the Waste Isolation Pilot Plant (WIPP) near Carlsbad, N.M. The exhibit includes a cut-away of the

  19. WIPP Documents - All documents by number

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Note: Documents that do not have document numbers are not included in this listing. Large file size alert This symbol means the document may be a large file size. All documents by number Common document prefixes DOE/CAO DOE/TRU DOE/CBFO DOE/WIPP DOE/EA NM DOE/EIS Other DOE/CAO Back to top DOE/CAO 95-1095, Oct. 1995 Remote Handled Transuranic Waste Study This study was conducted to satisfy the requirements defined by the WIPP Land Withdrawal Act and considered by DOE to be a prudent exercise in

  20. WIPP Driver Makes History, Again | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WIPP Driver Makes History, Again WIPP Driver Makes History, Again August 31, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - A brand-new shipping package arrived at the Department of Energy's Waste Isolation Pilot Plant (WIPP) during the early evening hours of August 25, but an all-too familiar face was behind the wheel of the vehicle carrying the package. Long-time WIPP driver Randy Anderson made history, again, when he guided the new TRUPACT-III

  1. Microsoft Word - WIPP-023 WIPP FHA rev 5a 01-22-12

    Office of Environmental Management (EM)

    WIPP-023, REV. 5A FIRE HAZARD ANALYSIS FOR THE WASTE ISOLATION PILOT PLANT Date Issued - January 2013 Prepared for the U.S. Department of Energy Waste Isolation Pilot Plant Nuclear ...

  2. Evaluation of proposed panel closure modifications at WIPP

    SciTech Connect (OSTI)

    Allen, Lawrence E.; Silva, Matthew K.; Channell, James K.; Abel, John F.; Morgan, Dudley R.

    2001-12-31

    A key component in the design of the WIPP repository is the installation of concrete structures as panel seals in the intake and exhaust drifts after a panel has been filled with waste containers. As noted in the EPA final rule, the panel seal closure system is intended to block brine flow between the waste panels at the WIPP. On April 17, 2001, the DOE proposed seven modifications to the EPA concerning the design of the panel closure system. EPA approval of these modifications is necessary since the details of the panel design are specified in EPA’s final rule as a condition for WIPP certification. However, the EPA has not determined whether a rulemaking would be required for these proposed design modifications. On September 4, 2001, the DOE withdrew the request, noting that it would be resubmitted on a future date. The Environmental Evaluation Group (EEG) contracted with two engineers, Dr. John Abel and Dr. Rusty Morgan, to evaluate the proposed modifications. The EEG has accepted the conclusions and recommendations from these two experts: 1) replacement of Salado Mass Concrete with a generic salt-based concrete; 2) replacement of the explosion wall with a construction wall; 3) replacement of freshwater grouting with salt-based grouting; 4) option to allow surface or underground mixing; and 5) option to allow up to one year for completion of closure. The proposed modification to allow local carbonate river rock as aggregate is acceptable pending demonstration that no problems will exist in the resulting concrete. The proposed modification to give the contractor discretion in removal of steel forms is not supported. Instead, several recommendations are made to specifically reduce the number of forms left, thereby reducing potential migration pathways.

  3. Actinide (III) solubility in WIPP Brine: data summary and recommendations

    SciTech Connect (OSTI)

    Borkowski, Marian; Lucchini, Jean-Francois; Richmann, Michael K.; Reed, Donald T.

    2009-09-01

    The solubility of actinides in the +3 oxidation state is an important input into the Waste Isolation Pilot Plant (WIPP) performance assessment (PA) models that calculate potential actinide release from the WIPP repository. In this context, the solubility of neodymium(III) was determined as a function of pH, carbonate concentration, and WIPP brine composition. Additionally, we conducted a literature review on the solubility of +3 actinides under WIPP-related conditions. Neodymium(III) was used as a redox-invariant analog for the +3 oxidation state of americium and plutonium, which is the oxidation state that accounts for over 90% of the potential release from the WIPP through the dissolved brine release (DBR) mechanism, based on current WIPP performance assessment assumptions. These solubility data extend past studies to brine compositions that are more WIPP-relevant and cover a broader range of experimental conditions than past studies.

  4. WIPP Update 4_22_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, 2 014 WIPP's w aste d isposal p anels As e ntries i nto W IPP's u nderground c ontinue, i t i s h elpful t o u nderstand t he l ayout o f t he u nderground facility. C urrently, ...

  5. WIPP Environmental Initiatives Earn DOE Recognition

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M., October 29, 2012 – The U.S. Department of Energy (DOE) recently recognized four initiatives at the Waste Isolation Pilot Plant (WIPP) and more than 20 people for improvements in energy, water and fleet efficiency while reducing pollution and waste across the DOE complex.

  6. WIPP Update 5_15_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP e vent b ioassay t esting program c omes t o a c lose Final b ioassay r esults f rom t he F ebruary 1 4 r adiological e vent h ave b een r eported. T he m aximum lifetime...

  7. WIPP Hazardous Waste Facility Permit - 2008 Update

    SciTech Connect (OSTI)

    Kehrman, R.F.; Most, W.A.

    2008-07-01

    Important new changes to the Hazardous Waste Facility Permit (HWFP) were implemented during 2007. The challenge was to implement these changes without impacting shipping schedules. Many of the changes required advanced preparation and coordination in order to transition to the new waste analysis paradigm, both at the generator sites and at the WIPP without interrupting the flow of waste to the disposal facility. Not only did aspects of waste characterization change, but also a new Permittees' confirmation program was created. Implementing the latter change required that new equipment and facilities be obtained, personnel hired, trained and qualified, and operating procedures written and approved without interruption to the contact-handled (CH) transuranic (TRU) waste shipping schedule. This was all accomplished successfully with no delayed or cancelled shipments. Looking forward to 2008 and beyond, proposed changes that will deal with waste in the DOE TRU waste complex is larger than the TRUPACT-IIs can handle. Size reduction of the waste would lead to unnecessary exposure risk and ultimately create more waste. The WIPP is working to have the Nuclear Regulatory Commission (NRC) certify the TRUPACT-III. The TRUPACT-III will be able to accommodate larger sized TRU mixed waste. Along with this new NRC-certified shipping cask, a new disposal container, the Standard Large Box, must be proposed in a permit modification. Containers for disposal of TRU mixed waste at the WIPP must meet the DOT 7A standards and be filtered. Additionally, as the TRUPACT-III/Standard Large Box loads and unloads from the end of the shipping cask, the proposed modification will add horizontal waste handling techniques to WIPP's vertical CH TRU waste handling operations. Another major focus will be the Hazardous Waste Facility Permit reapplication. The WIPP received its HWFP in October of 1999 for a term of ten years. The regulations and the HWFP require that a new permit application be

  8. WIPP UPDATE: April 29, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    decontamination methods. Technicians at the lab brushed salt surfaces with a non-toxic fluorescent powder. The consistency of the powder is similar to radioactive particles...

  9. WIPP Update 7_18_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J uly 1 8, 2014 WIPP t o r educe t ransportation c ontract d rivers Visionary S olutions, a c arrier c ontracted t o t ransport w aste t o W IPP, w ill r educe i ts d river t eams a s a r esult o f t he February e vents t hat s uspended w aste d isposal o perations a t t he f acility. T he t emporary h alt i n s hipments t o WIPP h as s ignificantly r educed t he n eed f or t ransportation s ervices i n t he n ear---term. In a nticipation o f t he d ecline i n s hipments, t he C arlsbad F ield O

  10. WIPP Update 9_5_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    S eptember 5, 2014 Personnel c ompleting p reparations f or u nderground f acility r ock b olting a ctivities Personnel a t t he W aste I solation P ilot P lant ( WIPP) a re c ompleting p reparations t o r esume r ock b olting a ctivities maintaining t he W IPP u nderground f acility i n a s afe a nd s table c ondition a s t he r ecovery p rocess c ontinues. A t WIPP, r ock b olts a re t ypically i nstalled i n a p attern t hat o ptimizes t he b olt's e ffectiveness t o e nsure s tability o f

  11. WIPP waste acceptance criteria and transportation system

    SciTech Connect (OSTI)

    Wu, C.F.; Ward, T.R.; Gregory, P.C.

    1991-12-31

    The Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico, USA, is a US Department of Energy (DOE) facility designed as a permanent repository for transuranic wastes in the center of a 2,000-foot-thick salt bed situated 2,150 feet underground. Construction of the facility started in 1975, under a congressional act of site selection. In 1979, demonstration of safe disposal at the WIPP was authorized by Public Law 96-164. The operational philosophy and practice at the facility are: (1) start clean -- stay clean, (2) meet or exceed regulatory requirements, and (3) control radiation exposure levels to as low as reasonably achievable (ALARA). Strict safety measures must be taken in the areas of waste preparation, transportation, and facility operation.

  12. WIPP Field Practices: Common Errors and Innovative Solutions | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy WIPP Field Practices: Common Errors and Innovative Solutions WIPP Field Practices: Common Errors and Innovative Solutions What to do when approaching an unfamiliar house for weatherization, with hidden air leakage and a multitude of mysteries? This webinar focuses on the Dos and Don'ts of WIPP weatherization, and is guaranteed to be an hour well spent looking over photographs that show detail and perspective on air sealing, blocking, venting, and other weatherization measures. This

  13. Leveraging Resources for Weatherization Innovation Pilot Projects (WIPP) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Pilot Projects » Leveraging Resources for Weatherization Innovation Pilot Projects (WIPP) Leveraging Resources for Weatherization Innovation Pilot Projects (WIPP) Did you know that any non-federal source that contributes to WIPP objectives can be counted as leveraged dollars? Is it possible you are under-reporting leveraged resources? This 15-minute webinar explains how to capture and report non-federally funded leveraged resources such as volunteer training, tools and

  14. Microsoft Word - Energy Department Initiates Recertification Process for WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Department Initiates Recertification Process for WIPP CARLSBAD, N.M., March 26, 2014 - The U.S. Department of Energy (DOE) submitted its third Compliance Recertification Application (CRA) for the Waste Isolation Pilot Plant's (WIPP) to the U.S. Environmental Protection Agency (EPA), demonstrating continued compliance with EPA regulations for radioactive waste disposal, as required by Congress. The recertification process is not related to recovery efforts from the recent events at WIPP,

  15. WIPP Installs Underground Personnel Notification and Tracking System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2016 WIPP Installs Underground Personnel Notification and Tracking System A new underground Wireless Notification and Tracking System (WNTS) has been installed at the Waste Isolation Pilot Plant (WIPP) that allows for two-way communication for both talk and text, audible and flashing alarms and allows personnel to immediately signal the Central Monitoring Room (CMR) in the event of an emergency. It also provides real-time tracking of all personnel entering the WIPP underground. "I'm

  16. Laboratory increases shipments of waste to WIPP repository

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab increases shipments to WIPP repository Laboratory increases shipments of waste to WIPP repository The campaign will eliminate LANL's existing backlog of approximately 1,500 drums of legacy transuranic waste awaiting shipment to WIPP. February 11, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics

  17. Leveraging Resources for the Weatherization Innovation Pilot Program (WIPP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Webinar Transcript | Department of Energy the Weatherization Innovation Pilot Program (WIPP) - Webinar Transcript Leveraging Resources for the Weatherization Innovation Pilot Program (WIPP) - Webinar Transcript This document contains the transcript for the Leveraging Resources for the Weatherization Innovation Pilot Program (WIPP) webinar held on February 12, 2013. leveraging_resources_webinar_transcript.pdf (112.26 KB) More Documents & Publications Leveraging Resources for

  18. 2014 2-24 WIPP radiological monitoring results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Immediate Release WIPP Reports New Environmental Monitoring Data CARLSBAD, N.M., February 24, 2014 - The U.S. Department of Energy (DOE) today reported new environmental monitoring data from samples collected at numerous locations on and around the Waste Isolation Pilot Plant (WIPP). Results indicate slightly elevated levels of airborne radioactive concentrations, which are consistent with the waste disposed of at WIPP. The samples taken demonstrate these concentrations remain well below a

  19. Microsoft Word - WIPP Updates_Underground Recovery Process Begins

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5DR0314 / 002NWPR0314 NWP Media Contacts: Donavan Mager Nuclear Waste Partnership LLC (575) 234-7586 www.wipp.energy.gov For Immediate Release WIPP UPDATES: Underground Recovery Process Begins Initial Results Show no Airborne Radioactive Contamination in Underground Shafts CARLSBAD, N.M., March 9 - Nuclear Waste Partnership (NWP), the management and operations contractor at the Waste Isolation Pilot Plant (WIPP) for the U.S. Department of Energy (DOE), has initiated the first phase of an

  20. DOE Awards Contract for Management of WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEWS NEWS MEDIA CONTACTS: FOR IMMEDIATE RELEASE Tom Welch, 202/586-4316 October 12, 2000 Greg Sahd (Carlsbad), 505/234-7532 Department of Energy Competitively Awards Contract for the Management of Waste Isolation Pilot Plant Secretary of Energy Bill Richardson today announced that the Energy Department will award a $500 million, five-year contract for the management and operation of the department's Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico, to Westinghouse TRU Solutions LLC.

  1. WIPP Radiological Relase Report Phase 2

    Office of Environmental Management (EM)

    Department of Energy Office of Environmental Management Accident Investigation Report Phase 2 Radiological Release Event at the Waste Isolation Pilot Plant, February 14, 2014 April 2015 Radiological Release Event at the Waste Isolation Pilot Plant Radiological Release Event at the Waste Isolation Pilot Plant Disclaimer On February 14, 2014, an airborne radiological release occurred at the Department of Energy Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. On March 4, 2014, an

  2. MODIFICATIONS TO THE WIPP PANEL CLOSURE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    29 Panel Closure ATTACHMENT 1 NMED COMMENTS ITEM 1 - MODIFICATIONS TO THE WIPP PANEL CLOSURE Page 2 of 29 Panel Closure 1-1: PMR Overview, Section 1, "Revision to the PCS Design" This section needs to explicitly explain which Attachment G1 Appendices are being deleted and which new appendices contain relevant information from old appendices. For example, Appendix B appears to include consolidated relevant information from the previous Appendices B through F; the new Appendix A replaces

  3. WIPP - Information on Proposed Permit Modifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Hazardous Waste Facility Permit RCRA Proposed Permit Modifications (Drafts) Draft Class 3 Permit Modification Request Addition of a Concrete Overpack Container Storage Unit dated August 2016 Fact Sheets Public Notices Please forward comments to the following email address: Draft.ModificationResponse@. These Documents are NOT FINAL and have not been formally submitted to the permitting authority for approval. These Documents are subject to future change at the discretion of the U.S.

  4. Actinide Solubility and Speciation in the WIPP

    SciTech Connect (OSTI)

    Reed, Donald T.

    2015-11-02

    The presentation begins with the role and need for nuclear repositories (overall concept, international updates (Sweden, Finland, France, China), US approach and current status), then moves on to the WIPP TRU repository concept (design, current status--safety incidents of February 5 and 14, 2014, path forward), and finally considers the WIPP safety case: dissolved actinide concentrations (overall approach, oxidation state distribution and redox control, solubility of actinides, colloidal contribution and microbial effects). The following conclusions are set forth: (1) International programs are moving forward, but at a very slow and somewhat sporadic pace. (2) In the United States, the Salt repository concept, from the perspective of the long-term safety case, remains a viable option for nuclear waste management despite the current operational issues/concerns. (3) Current model/PA prediction (WIPP example) are built on redundant conservatisms. These conservatisms are being addressed in the ongoing and future research to fill existing data gaps--redox control of plutonium by Fe(0, II), thorium (analog) solubility studies in simulated brine, contribution of intrinsic and biocolloids to the mobile concentration, and clarification of microbial ecology and effects.

  5. WIPP Receives First Remote-Handled Waste Shipment From Sandia...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For immediate release WIPP Receives First Remote-Handled Waste Shipment From Sandia Labs ... (RH-TRU) waste shipments from Sandia National Laboratories (SNL) in Albuquerque. ...

  6. WIPP Mine Rescue Team Sweeps Southeast Missouri Competition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in a mine maintained by the University of Missouri at Rolla. Individually, WIPP's Joe Baca won the bench competition, with teammate Richard West placing third. The benchman...

  7. Microsoft Word - WIPP Update 3_13_14a

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fire Investigators to Issue Report Accident Investigation Board to Issue WIPP Fire Report Friday The Accident Investigation Board, charged with investigating the salt haul truck ...

  8. WIPP, Carlsbad Host Department of State Conference | Department...

    Broader source: Energy.gov (indexed) [DOE]

    ... salt taken from the Morsleben mine in Germany. WIPP Shares Expertise with Salt Club Members Participants in the workshops in Germany toured Asse II, one of Germany's two ...

  9. WIPP Hosts Fire Protection and Emergency Response Workshop

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 6, 2015 WIPP Hosts Fire Protection and Emergency Response Workshop Fire protection experts from the Department of Energy's Office of Environmental Management (DOE-EM), the...

  10. Waste Isolation Pilot Plant (WIPP) Recovery | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Isolation Pilot Plant (WIPP) Recovery Waste Isolation Pilot Plant (WIPP) Recovery The U.S. Department of Energy’s (DOE) Waste Isolation Pilot Plant (WIPP) is a deep geologic repository for permanent disposal of a specific type of waste that is the byproduct of the nation's nuclear defense program. WIPP is the nation's only repository for the disposal of nuclear waste known as transuranic, or TRU, waste. Two incidents occurred in February 2014 that led to the current shutdown of the

  11. Mechanical Modeling of a WIPP Drum Under Pressure | Department...

    Office of Environmental Management (EM)

    This document corresponds to Appendix D: Modeling Integrated Summary Report of the Technical Assessment Team Report. Mechanical Modeling of a WIPP Drum Under Pressure (2.59 MB) ...

  12. Microsoft Word - WIPP Update 10_17_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as EM Acting Assistant Secretary Mark Whitney looks on. WIPP UPDATE: October 17, 2014 Head of EM Visits Waste Isolation Pilot Plant for First Underground Tour Since February...

  13. Microsoft Word - NR WIPP CONTRACT EXTENSION MAY 3 2010.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Extends Management and Operations Contract at Waste Isolation Pilot Plant Carlsbad, NM. - The U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) today announced a...

  14. Appendix DATA Attachment B: WIPP Waste Containers and Emplacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlsbad Field Office Carlsbad, New Mexico Appendix DATA-2014 Attachment B: WIPP Waste Containers and Emplacement Table of Contents DATA-B-1.0 Authorized Waste Emplacement ...

  15. Analysis of Waste Isolation Pilot Plant (WIPP) Samples by the...

    Office of Environmental Management (EM)

    Analysis of Waste Isolation Pilot Plant (WIPP) Samples by the Savannah River National ... investigation into the radiological release event at the Waste Isolation Pilot Plant. ...

  16. Analysis of Waste Isolation Pilot Plant (WIPP) Underground and...

    Office of Environmental Management (EM)

    Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah ... investigation into the radiological release event at the Waste Isolation Pilot Plant. ...

  17. WIPP personnel plan activities for national engineers week

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy's (DOE) Waste Isolation Pilot Plant (WIPP) will be on a mission next week - to encourage students to pursue careers in engineering, mathematics and science. The information ...

  18. How Does the WIPP Shutdown Impact New Mexico, Idaho, and South...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    How Does the WIPP Shutdown Impact New Mexico, Idaho, and South Carolina How Does the WIPP Shutdown Impact New Mexico, Idaho, and South Carolina Topic: Southwest Research and ...

  19. WIPP UPDATE: July 15, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15, 2014 Waste Hoist cleaning nears completion Cleaning activities on the Waste Hoist, or elevator, are nearing completion. The soot that accumulated on surfaces of the hoist and associated ductwork as the result of the February 5 fire has been removed. Workers will now redirect electrical power from the hoist to allow safe access to the electrical panels as they complete final cleaning activities. The Waste Hoist System, including the shaft leading to the underground, will be inspected once

  20. WIPP Employee Inducted Into Mine Rescue Hall of Fame- WIPP Teams Recognized at National Competition

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M., August 2, 2013 - Long-time Waste Isolation Pilot Plant (WIPP) employee Gary Kessler was inducted into the Metal/Non-Metal National Mine Rescue Hall of Fame on Aug. 1, 2013 at the biennial mine rescue competition in Reno, Nevada.

  1. WIPP Update and Status of Recovery | Department of Energy

    Office of Environmental Management (EM)

    Update and Status of Recovery WIPP Update and Status of Recovery WIPP Update and Status of Recovery (908.27 KB) More Documents & Publications Chairs Meeting - April 2014 Accident Investigation Report - Radiological Release Occurrence Reporting and Processing System (ORPS) - Potential for the Presence of Untreated Nitrate Waste Salts in TRU Waste Packages

  2. Leveraging Resources for Weatherization Innovation Pilot Projects (WIPP)

    Broader source: Energy.gov [DOE]

    As a WIPP agency, reporting leveraged dollars is paramount to your entitys success. This webinar will review the WIPP definition and policy, discuss leveraging items you may not have thought possible to claim, and show you ways to calculate accrued leveraged dollars.

  3. Achieving WIPP certification for software: A white paper

    SciTech Connect (OSTI)

    Matthews, S.D.; Adams, K.; Twitchell, K.E.

    1998-07-01

    The NMT-1 and NMT-3 organizations within the Chemical and Metallurgical Research (CMR) facility at the Los Alamos National Laboratory (LANL) is working to achieve Waste Isolation Pilot Plant (WIPP) certification to enable them to transport their TRU waste to WIPP. In particular, the NMT-1 management is requesting support from the Idaho National Engineering and Environmental Laboratory (INEEL) to assist them in making the Laboratory Information Management System (LIMS) software WIPP certifiable. Thus, LIMS must be compliant with the recognized software quality assurance (SQA) requirements stated within the QAPD. Since the Idaho National Engineering and Environmental Laboratory (INEEL) has achieved WIPP certification, INEEL personnel can provide valuable assistance to LANL by sharing lessons learned and recommendations. Thus, this white paper delineates the particular software quality assurance requirements required for WIPP certification.

  4. Instrumentation of the thermal/structural interactions in situ tests at the Waste Isolation Pilot Plant (WIPP)

    SciTech Connect (OSTI)

    Munson, D.E.; Hoag, D.L.; Blankenship, D.A.; DeYonge, W.F.; Schiermeister, D.M.

    1997-04-01

    The Department of Energy has constructed the Waste Isolation Pilot Plant (WIPP) to develop the technology for the disposal of radioactive waste from defense programs. Sandia National Laboratories had the responsibility for the experimental activities at the WIPP and fielded several large-scale Thermal/Structural Interactions (TSI) in situ tests to validate techniques used to predict repository performance. The instrumentation of these tests involved the placement of over 4,200 gages including room closure gages, borehole extensometers, stress gages, borehole inclinometers, fixed reference gages, borehole strain gages, thermocouples, thermal flux meters, heater power gages, environmental gages, and ventilation gages. Most of the gages were remotely read instruments that were monitored by an automated data acquisition system, but manually read instruments were also used to provide early deformation information and to provide a redundancy of measurement for the remote gages. Instruments were selected that could operate in the harsh environment of the test rooms and that could accommodate the ranges of test room responses predicted by pretest calculations. Instruments were tested in the field prior to installation at the WIPP site and were modified to improve their performance. Other modifications were made to gages as the TSI tests progressed using knowledge gained from test maintenance. Quality assurance procedures were developed for all aspects of instrumentation including calibration, installation, and maintenance. The instrumentation performed exceptionally well and has produced a large quantity of quality information.

  5. The influence of salt aerosol on alpha radiation detection by WIPP continuous air monitors

    SciTech Connect (OSTI)

    Bartlett, W.T.; Walker, B.A.

    1997-08-01

    Waste Isolation Pilot Plant (WIPP) alpha continuous air monitor (CAM) performance was evaluated to determine if CAMs could detect accidental releases of transuranic radioactivity from the underground repository. Anomalous alpha spectra and poor background subtraction were observed and attributed to salt deposits on the CAM sampling filters. Microscopic examination of salt laden sampling filters revealed that aerosol particles were forming dendritic structures on the surface of the sampling filters. Alpha CAM detection efficiency decreased exponentially as salt deposits increased on the sampling filters, suggesting that sampling-filter salt was performing like a fibrous filter rather than a membrane filter. Aerosol particles appeared to penetrate the sampling-filter salt deposits and alpha particle energy was reduced. These findings indicate that alpha CAMs may not be able to detect acute releases of radioactivity, and consequently CAMs are not used as part of the WIPP dynamic confinement system. 12 refs., 12 figs., 1 tab.

  6. Web Maintenance

    Broader source: Energy.gov [DOE]

    EERE expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance:technical maintenanceandcontent maintenance....

  7. National Museum of Nuclear Science & History Opens WIPP Exhibit |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Museum of Nuclear Science & History Opens WIPP Exhibit National Museum of Nuclear Science & History Opens WIPP Exhibit November 22, 2011 - 3:17pm Addthis To celebrate the WIPP's 10,000th shipment of defense-related TRU waste, the National Museum of Nuclear Science & History added a new exhibit, which includes one the receptacles, pictured above, used by the Energy Department to ship transuranic (TRU) waste from sites located across the country to the Waste

  8. http://www.wipp.ws/TeamWorks/truteamworks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/04 Shipments expected this week: RFETS (13), SRS (6) A weekly e-newsletter for the Waste Isolation Pilot Plant team February 12, 2004 The Big Story SEGA and MEGA exemplify science@wipp Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Tools Acronym List Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 02/12/04 at 9:24 a.m.)

  9. http://www.wipp.ws/TeamWorks/truteamworks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9/04 Shipments expected this week: SRS (6) A weekly e-newsletter for the Waste Isolation Pilot Plant team February 19, 2004 The Big Story WIPP public information meetings held Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Tools Acronym List Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 02/19/04 at 6:55 a.m.) Shipments scheduled

  10. http://www.wipp.ws/TeamWorks/truteamworks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    25/04 | Shipments expected for the week 3/28/04 through 4/3/04: INEEL (2), RFETS (11), SRS (6) A weekly e-newsletter for the Waste Isolation Pilot Plant team March 25, 2004 The Big Story AMWTP sends first shipment to WIPP Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP

  11. WIPP Monitoring Program Ensures Worker Safety | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Monitoring Program Ensures Worker Safety WIPP Monitoring Program Ensures Worker Safety March 3, 2011 - 12:00pm Addthis Media Contact Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M. - Officials with the U.S. Department of Energy's (DOE's) Carlsbad Field Office (CBFO) are citing the recent accreditation of the Waste Isolation Pilot Plant (WIPP) Laboratory as a cause for reflection on the important role environmental monitoring has played during WIPP's 12-year history. In

  12. Radionuclide transport in sandstones with WIPP brine

    SciTech Connect (OSTI)

    Weed, H.C.; Bazan, F.; Fontanilla, J.; Garrison, J.; Rego, J.; Winslow, A.M.

    1981-02-01

    Retardation factors (R) have been measured for the transport of /sup 3/H, /sup 95m/Tc, and /sup 85/Sr in WIPP brine using St. Peter, Berea, Kayenta, and San Felipe sandstone cores. If tritium is assumed to have R=1, /sup 95m/Tc has R=1.0 to 1.3 and therefore is essentially not retarded. Strontium-85 has R = 1.0 to 1.3 on St. Peter, Berea, and Kayenta, but R=3 on San Felipe. This is attributed to sorption on the matrix material of San Felipe, which has 45 volume % matrix compared with 1 to 10 volume % for the others. Retardation factors (R/sub s/) for /sup 85/Sr calculated from static sorption measurements are unity for all the sandstones. Therefore, the static and transport results for /sup 85/Sr disagree in the case of San Felipe, but agree for St. Peter, Berea, and Kayenta.

  13. WIPP Update 3_30_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    M arch 3 0, 2 014 There i s n ot a W IPP R ecovery update t oday. P lease g o t o t he W IPP R ecovery w eb p age a t www.wipp.energy.gov f or i nformation o n r ecovery a ctivities. Community Meetings Scheduled April 3 - C arlsbad M ayor D ale J anway a nd D OE w ill c o---host a T own H all m eeting T hursday, A pril 3 , featuring u pdates o n W IPP r ecovery a ctivities. The t own h all m eetings a re h eld a t 5 :30 p .m. e very T hursday a t t he C arlsbad C ity C ouncil C hambers, 1 01 N.

  14. WIPP Update 4_23_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 2 014 Re---entry t eams a ccess R oom 7 WIPP e mployees r e---entered R oom 7 o f P anel 7 t oday i n a n a ttempt t o d etermine t he location a nd source o f t he F ebruary 1 4 r adiological r elease i n t he u nderground f acility. R oom 7 i s w here t he most recent contact---handled transuranic w aste d isposal a ctivities o ccurred, m aking i t t he m ost l ikely location of t he e vent. The d ay b egan w ith t wo a dvance support t eams e ntering t he W IPP u nderground f acility t o e

  15. WIPP Update 4_26_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2 014 The s cience o f W IPP In r ecent w eeks, t here h ave b een m any q uestions about t he W aste I solation P ilot P lant ( WIPP) a nd w hy southeastern N ew M exico w as s elected a s t he l ocation f or t he w orld's o nly r epository f or t ransuranic waste d isposal. Government o fficials a nd s cientists c hose t he W IPP s ite t hrough a s election p rocess t hat s tarted i n t he 1950s. A t t hat t ime, t he N ational A cademy o f S ciences c onducted a n ationwide s earch f or g

  16. WIPP Update 5_13_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 2 014 Venting o f a ll w aste c ontainers i s r equired b efore d isposal a t W IPP WIPP i s r equired to v ent t he t ransuranic w aste c ontainers d estined f or d isposal a t the f acility to p revent buildup o f h ydrogen o r v olatile o rganic c ompound g as i n t he c ontainer. The c ontainers are c onstantly vented f rom t he t ime t hey a re f illed w ith w aste. To v ent t he c ontainers, a s pecialized f ilter t hat t raps r adioactive p articles w hile a llowing g ases t o d iffuse

  17. WIPP Update 5_21_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 1, 2 014 WIPP R eviewing N MED A dministrative O rder Yesterday, t he N ew M exico E nvironment D epartment issued an A dministrative O rder r equiring t he Waste I solation P ilot P lant t o d evelop a n itrate s alt b earing w aste c ontainer i solation plan f or t he expedited c losure o f Panel 6 a nd Room 7 o f Panel 7 . T he D epartment i s c ommitted t o p rotecting t he health a nd s afety o f o ur w orkers a t W IPP, t he p ublic a nd t he e nvironment a s w e w ork t o u nderstand t

  18. EM Releases WIPP Recovery Fact Sheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 12, 2016 - 7:00pm Addthis CARLSBAD, N.M. - February 2016 marks two years since ... waste disposal site outside of Carlsbad, N.M. Department of Energy Releases WIPP ...

  19. Milestone Shipment Arrives at WIPP | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    the EM program at DOE's Idaho site. "Safety is the most ... CBFO has responsibility for WIPP and the National TRU ... Waste Shipment From Sandia Labs DOE Completes TRU Waste ...

  20. WIPP radiological assistance team dispatched to Los Alamos as...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the Los Alamos fire. The team's findings will be reported to the on-scene Central Command Post. DOE maintains RAP teams in eight different regions nationally. The WIPP RAP...

  1. WIPP Transportation Services Contract Award Announced by U.S...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    www.wipp.energy.gov Bill Taylor Environmental Management Consolidated Business Center (513) 246-0539 U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant...

  2. Microsoft Word - WIPP Update 6_27_14.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Panel 7, Room 7 As the investigation into the cause of the February 14 radiological release continues, WIPP teams are working to create a system to examine all containers in Panel ...

  3. WIPP Security Contractor Receives DOE Voluntary Protection Program Award

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M.– Security Walls, LLC, the security contractor for the U.S. Department of Energy’s (DOE) Waste Isolation Pilot Plant (WIPP), recently received the DOE Voluntary Protection Program (VPP) Legacy Star award.

  4. EXO project equipment successfully placed underground at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    were lowered into the mine by hoist and then transported through almost a kilometer of tunnels to the North Experimental Area with a 41-ton forklift. DOE made WIPP's unique...

  5. Microsoft Word - WIPP Update 11_6_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    fan on October 21 (see October 23 WIPP Update) showed minimal levels of radioactive contamination detected at two of the on-site air sampling locations. The levels were well below...

  6. Microsoft Word - WIPP Update 3_14_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 Media Contact: Bradley Bugger U.S. DOE Carlsbad Field Office (575) 234-7309 www.wipp.energy.gov - 2 -...

  7. Microsoft Word - WIPP Update 3_16_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 Media Contact: Bradley Bugger U.S. DOE Carlsbad Field Office (575) 234-7309 www.wipp.energy.gov - 2 - Q....

  8. Microsoft Word - WIPP Update 3_24_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 Media Contact: Bradley Bugger U.S. DOE Carlsbad Field Office (575) 234-7309 www.wipp.energy.gov - 2 - Key...

  9. Final - WIPP Honored at Sustainable Business Summit 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    one of two finalists at the New Mexico Sustainable Business Summit held in Albuquerque in ... WIPP was selected as an honoree in the category of sustainable workplace. "I'm very proud ...

  10. WIPP Performance Assessment: Current Status and the Road Ahead | Department

    Office of Environmental Management (EM)

    of Energy Performance Assessment: Current Status and the Road Ahead WIPP Performance Assessment: Current Status and the Road Ahead Presentation from the 2015 Annual Performance and Risk Assessment (P&RA) Community of Practice (CoP) Technical Exchange Meeting held in Richland, Washington on December 15-16, 2015. WIPP Performance Assessment: Current Status and the Road Ahead (3.02 MB) More Documents & Publications Performance Assessment Updates for Waste Isolation Pilot Plant

  11. WIPP's Mine Rescue Teams Lead Competition | Department of Energy

    Office of Environmental Management (EM)

    WIPP's Mine Rescue Teams Lead Competition WIPP's Mine Rescue Teams Lead Competition July 30, 2013 - 12:00pm Addthis WIPP’s mine rescue team members, back row from left, are NWP President and Project Manager Farok Sharif; Heath Fowler; Manny Marquez; Mat Ridgway; Gary Kessler; Curtis Sanders, III; Jim Pierce; Tony Mihelic; Joe Baca; Justin Bailey; Ty Zimmerly; Fabian Carrasco; Chauncey Ortega; Nico Dominguez; and CBFO Manager Joe Franco. In front are Richard West, team trainer; and Ann

  12. WIPP Begins Preliminary Work on New Permanent Ventilation System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 28, 2016 WIPP Begins Preliminary Work on New Permanent Ventilation System The geotechnical investigation necessary for construction of a new Permanent Ventilation System (PVS), including a new filter building and a new exhaust shaft, is underway at the Waste Isolation Pilot Plant (WIPP). Investigation activities include drilling multiple bore holes and the collection of core samples at various depths. Analysis of the core samples will provide information for the building design team on

  13. WIPP RH-TRU Waste Study - Notice To Users

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notice To Users The NTP World Wide Web (WWW) server is provided as a service of the Department of Energy for distribution of publicly available information and is maintained by the Waste Isolation Pilot Plant (WIPP). NTP is an agency of the Federal Government of the United States of America. Use of NTP WWW server is intended only for the retrieval of information available through NTP WWW documents. Only authorized WIPP administrators may make changes to the information. This document could not

  14. Information Lag in Certification and Recertification of WIPP

    SciTech Connect (OSTI)

    Casey, S. C.; Patterson, R. L.; Shoemaker, P. E.

    2003-02-25

    The DOE established a Waste Isolation Pilot Plant (WIPP) Recertification Project to ensure the timely completion of the documentation to meet the requirement of the WIPP Land Withdrawal Act (LWA) (1) to demonstrate continued compliance with U.S. Environmental Protection Agency (EPA) disposal regulations at five-year intervals. This paper describes the reason for the self-imposed ''blackout'' period and provides an outline of the compliance process.

  15. Microsoft Word - NR WIPP CONTRACT EXTENSION MAY 3 2010.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Extends Management and Operations Contract at Waste Isolation Pilot Plant Carlsbad, NM. - The U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) today announced a two-year extension of the Washington TRU Solutions LLC management and operations (M&O) contract. As the WIPP M&O contractor, Washington TRU Solutions is responsible for managing the National Transuranic (TRU) Waste Program, which includes retrieval, characterization, transportation, and disposal activities at

  16. Microsoft Word - WIPP Update 3_11_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data Show Filtration System Worked Sampling Data for Ventilation System Posted Sampling data from the ventilation system at the Waste Isolation Pilot Plant shows the filtration system worked as designed during the recent radiation release incident. The data has been posted to the WIPP web site (http://www.wipp.energy.gov/Special/Ventilation%20System%20Sampling%20Results.pdf). These samples were analyzed following the detection of airborne radioactivity on February 14, 2014. They are not

  17. Microsoft Word - WIPP Update 3_25_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 2014 HEPA Filter Test Moves Forward Los Alamos resumed aerosol tests on WIPP high efficiency air particulate (HEPA) filters after acquiring a larger generator needed to inject the aerosol into the filters. The tests aim to determine the efficiency of the filters, some of which will be scheduled for replacement. Additional HEPA filters have been ordered and will be on-site next week. Before the replacement filters arrive at WIPP they must be shipped from the manufacturer to a Maryland facility

  18. Sampling Report for August 15, 2014 WIPP Samples

    Office of Environmental Management (EM)

    0 L L N L - X X X X - X X X X X Sampling Report for August 15, 2014 WIPP Samples UNCLASSIFIED Forensic Science Center December 19, 2014 Sampling Report for August 15 2014 WIPP Samples Lawrence Livermore National Laboratory UNCLASSIFIED ii Disclaimer This document was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor Lawrence Livermore National Security, LLC, nor any of their employees makes any warranty, expressed or

  19. Anniversary of Fire, Radiological Events Marks Major Progress at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 12, 2016 Anniversary of Fire, Radiological Events Marks Major Progress at WIPP February 2016 marks two years since the underground fire and radiological release events forced the temporary closure of the Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico. Since that time much progress has been made in the recovery of the underground including mine stability and habitability, initial panel closure, radiological risk remediation and the addition of

  20. DOE Issues Request for Information for Potential WIPP Transportation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Procurement | Department of Energy Information for Potential WIPP Transportation Services Procurement DOE Issues Request for Information for Potential WIPP Transportation Services Procurement February 4, 2016 - 1:00pm Addthis Media Contact Bill Taylor, 575-234-7591, bill.taylor@cbfo.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center (EMCBC) today issued a Sources Sought/Request for Information (RFI) seeking interested

  1. Test Plan: WIPP bin-scale CH TRU waste tests

    SciTech Connect (OSTI)

    Molecke, M.A.

    1990-08-01

    This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.

  2. WIPP Remote Handled Waste Facility: Performance Dry Run Operations

    SciTech Connect (OSTI)

    Burrington, T. P.; Britain, R. M.; Cassingham, S. T.

    2003-02-24

    The Remote Handled (RH) TRU Waste Handling Facility at the Waste Isolation Pilot Plant (WIPP) was recently upgraded and modified in preparation for handling and disposal of RH Transuranic (TRU) waste. This modification will allow processing of RH-TRU waste arriving at the WIPP site in two different types of shielded road casks, the RH-TRU 72B and the CNS 10-160B. Washington TRU Solutions (WTS), the WIPP Management and Operation Contractor (MOC), conducted a performance dry run (PDR), beginning August 19, 2002 and successfully completed it on August 24, 2002. The PDR demonstrated that the RHTRU waste handling system works as designed and demonstrated the handling process for each cask, including underground disposal. The purpose of the PDR was to develop and implement a plan that would define in general terms how the WIPP RH-TRU waste handling process would be conducted and evaluated. The PDR demonstrated WIPP operations and support activities required to dispose of RH-TRU waste in the WIPP underground.

  3. 10,000th Shipment Celebrated at WIPP | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Shipment Celebrated at WIPP 10,000th Shipment Celebrated at WIPP October 24, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - Approximately 130 people gathered at the U.S. Department of Energy's (DOE's) Waste Isolation Pilot Plant (WIPP) on October 22, to celebrate the 10,000th shipment of transuranic (TRU) waste to WIPP, which arrived safely late last month. The event was attended by elected and appointed officials, state and local leaders, WIPP

  4. 2011-07 "Maximum Utilization of WIPP by Increasing MDA G TRU...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 "Maximum Utilization of WIPP by Increasing MDA G TRU Shipments" 2011-07 "Maximum Utilization of WIPP by Increasing MDA G TRU Shipments" The intent of this recommendation is to ...

  5. Report for Waste Isolation Pilot Plant (WIPP) UG Sample #3, R15C5...

    Office of Environmental Management (EM)

    for Waste Isolation Pilot Plant (WIPP) UG Sample 3, R15C5 (9314) Report for Waste Isolation Pilot Plant (WIPP) UG Sample 3, R15C5 (9314) This document was used to determine ...

  6. January 23, 2007: WIPP receives first shipment of waste | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 23, 2007: WIPP receives first shipment of waste January 23, 2007: WIPP receives first shipment of waste January 23, 2007: WIPP receives first shipment of waste January 23, 2007 The Department's Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, receives (pdf) its first shipment of remote-handled (RH) transuranic (TRU) radioactive waste. The waste, which consisted of three 30-gallon drums of radioactive debris waste and originated at DOE's Idaho National Laboratory, was

  7. DOE Honors WIPP Representative for Cutting Travel Costs, Greenhouse Gas Emissions

    Broader source: Energy.gov [DOE]

    Judy McLemore is recognized for helping advance DOE’s management and operational excellence at WIPP.

  8. The Direct Path To WIPP - 12471

    SciTech Connect (OSTI)

    Spoerner, M.T.; Burger, M.J.; Garcia, J. [Sandia National Laboratories (United States); Humphrey, B.J. [Weston Solutions, Inc. (United States); Rast, D. [National Nuclear Security Administration, Sandia Site Office (United States)

    2012-07-01

    Sandia National Laboratories/New Mexico (SNL/NM), designated as a small quantity site (SQS) by the National TRU Program (NTP), generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) waste primarily from the decontamination and clean-out of glove boxes at the Hot Cell Facility (HCF) at Technical Area (TA) V. All of the waste required repackaging, with the CH TRU waste being repackaged from late 2007 through 2011. Three shipments of CH were completed in October 2011, which de-inventoried SNL/NM's legacy TRU waste. In FY11, RH TRU waste was repackaged at the Auxiliary Hot Cell Facility (AHCF) located in TAV with the support of the Central Characterization Project (CCP). The waste was originally packaged in SNL/NM fabricated casks, cement or lead-lined 55-gallon drums, or 30-gallon drums. The AHCF is a small hot cell, with access only through a roof port which presented challenges for inserting and removing waste from the hot cell. The CCP provided visual examination operators (VEOs) to observe and document each waste item repackaged, removal of prohibited items, and radiological sampling. Dose-to-Curie measurements were calculated by CCP after a radiological report was prepared using scaling factors determined by the analysis of swipe samples. Finally, headspace gas samples were taken and sent to the Advanced Mixed Waste Treatment Project (AMWTP) for analysis. Despite the challenges, the RH waste is on track to be shipped to WIPP in early FY12. The processes used and procedures developed to conduct the repackaging operations, the issues identified and mitigated were challenging but the cooperation between SNL/NM and the Central Characterization Program (CCP) enabled SNL/NM to complete the repackaging and support the characterization and shipment. An inventory list, identification of the campaigns, discussion of the challenges and mitigations, and the final loading of the RH 72-B casks at TA-V for direct shipment to the Waste Isolation Pilot Plant

  9. WIPP Reaches Milestone „ First Disposal Room Filled

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Reaches Milestone - First Disposal Room Filled CARLSBAD, N.M., September 4, 2001 - The U.S. Department of Energy's (DOE) Carlsbad Field Office today announced that Room 7 of Panel 1 at the Waste Isolation Pilot Plant (WIPP), the first underground room used for disposal operations, has been filled to capacity with transuranic waste. The milestone was reached at about 3:30 p.m. on August 24, as Waste Handling personnel emplaced a shipment of waste from the Idaho National Engineering and

  10. Westinghouse receives high marks for management, operation of WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Receives High Marks For Management, Operation of WIPP CARLSBAD, N.M., January 11, 2000 - The Westinghouse Waste Isolation Division (WID) received high marks from the U.S. Department of Energy (DOE) for its management and operation of the Waste Isolation Pilot Plant (WIPP) in fiscal year 1999. For the 12-month performance evaluation period from October 1, 1998 through September 30, 1999, Westinghouse received 94.9 of a possible 100 points. The DOE considers a score of 86 to 95 as good. A score

  11. http://www.wipp.ws/TeamWorks/truteamworks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    26/04 Shipments expected for the week of 02/22/04 through 2/28/04: Hanford (2), RFETS (11), SRS (6) A weekly e-newsletter for the Waste Isolation Pilot Plant team February 26, 2004 The Big Story WIPP impacts international Waste Management Symposium Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates.

  12. http://www.wipp.ws/TeamWorks/truteamworks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5/04 | Shipments expected for the week of 03/14/04 through 3/20/04: INEEL (4), Hanford (2), RFETS (11), SR A weekly e-newsletter for the Waste Isolation Pilot Plant team March 15, 2004 Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 03/15/04 at 8:59 a.m.)

  13. http://www.wipp.ws/TeamWorks/truteamworks.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8/04 | Shipments expected for the week 3/21/04 through 3/27/04: Hanford (2), INEEL (3), RFETS (11), SRS A weekly e-newsletter for the Waste Isolation Pilot Plant team March 18, 2004 The Big Story WIPP personnel overcome evacuation order Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to

  14. Sampling Report for May-June, 2014 WIPP Samples

    Office of Environmental Management (EM)

    1 L L N L - X X X X - X X X X X Sampling Report for May- June, 2014 WIPP Samples UNCLASSIFIED Forensic Science Center January 8, 2015 Sampling Report for May-June, 2014 WIPP Samples Lawrence Livermore National Laboratory UNCLASSIFIED ii Disclaimer This document was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor Lawrence Livermore National Security, LLC, nor any of their employees makes any warranty, expressed or

  15. Appendix DATA Attachment B: WIPP Waste Containers and Emplacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Attachment B: WIPP Waste Containers and Emplacement United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Appendix DATA-2014 Attachment B: WIPP Waste Containers and Emplacement Table of Contents DATA-B-1.0 Authorized Waste Emplacement Containers DATA-B-1.1 Container Descriptions DATA-B-1.2 Dunnage Containers DATA-B-1.3 Payload Descriptions DATA-B-1.4 Emplacement Configurations DATA-B-2.0 References List of Figures Figure DATA-B- 1. 55-gal Drum

  16. WIPP Marks 12 Years of Operations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Marks 12 Years of Operations WIPP Marks 12 Years of Operations March 28, 2011 - 12:00pm Addthis Media Contact Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M - On Saturday, March 26, 2011, the Department of Energy's Waste Isolation Pilot Plant marked another anniversary. It has now been 12 years since WIPP received its first shipment of transuranic (TRU) waste. TRU waste consists of clothing, tools, rags, debris, residues and other disposal items contaminated with

  17. CBFO and WIPP Volunteerism Helps Little Ones This Winter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CBFO and WIPP Volunteerism Helps Little Ones This Winter CARLSBAD, N.M., November 25, 2014 -- November's winter chill started early in New Mexico; however, children in the Carlsbad area should be able to keep warm while outdoors thanks in part to the actions of the Department of Energy Carlsbad Field Office (CBFO) and Waste Isolation Pilot Plant (WIPP) team of employees. "This is the third year we've held the 'Karing for Kids Koat Drive,' which is on-going from October through the end of

  18. WIPP's Mine Rescue Teams Win Big in Contest | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WIPP's Mine Rescue Teams Win Big in Contest WIPP's Mine Rescue Teams Win Big in Contest April 27, 2016 - 12:50pm Addthis The WIPP Blue Mine Rescue Team moves through the course in the field competition of the Southwest Regional Mine Rescue Contest. The WIPP Blue Mine Rescue Team moves through the course in the field competition of the Southwest Regional Mine Rescue Contest. WIPP’s Red Mine Rescue Team took first place in the first aid competition. WIPP's Red Mine Rescue Team took first

  19. Getting waste ready for shipment to the WIPP: integration of characterization and certification activities

    SciTech Connect (OSTI)

    Sinkule, B.; Knudsen, K.; Rogers, P.

    1996-06-01

    The Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC) serve as the primary directive for assuring the safe handling, transportation, and disposal of transuranic (TRU) waste generated at Department of Energy (DOE) sites. The WIPP WAC address fulfillment of WIPP`s operational safety and performance assessment criteria, compliance with Resource Conservation and Recovery Act (RCRA) requirements, and preparation of waste packages that meet all transportation criteria. At individual generator sites, preparation of transuranic waste for final disposal at WIPP includes characterizing the waste to meet the requirements of the transuranic Waste Characterization Quality Assurance Program Plan (QAPP) and certifying waste containers to meet the WIPP WAC and the Transuranic Package Transporter-II Authorized Methods for Payload Control (TRAMPAC). This paper compares the quality assurance and quality control requirements specified in the WIPP WAC, QAPP, and TRAMPAC and discusses the potential to consolidate activities to comply with the TRU waste characterization and certification program requirements.

  20. WIPP Uses Recovery Act Funding to Reduce Nuclear Waste Footprint

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M., August 1, 2011 – The U.S. Department of Energy’s (DOE’s) Carlsbad Field Office (CBFO) reduced the nuclear waste footprint by using American Recovery and Reinvestment Act funds to expedite the clean up of five transuranic (TRU) waste storage sites and to make important infrastructure improvements at the Waste Isolation Pilot Plant (WIPP).

  1. Compliance with WIPP quality assurance objectives for nondestructive assay

    SciTech Connect (OSTI)

    Marcinkiewicz, C.J.

    1995-12-31

    Measurement facilities performing characterization of wastes intended for disposal at the Waste Isolation Pilot Plant (WIPP) are required to produce data of sufficient quality to meet the Data Quality Objectives (DQOs) of the Transuranic Waste Program. This paper provides the details of the required method performance data. Plans for on-site assessments by independent review teams are discussed.

  2. DOE Issues WIPP Radiological Release Phase II Investigation Report

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Today, the Department of Energy Office of Environmental Management (EM) released the Accident Investigation Board (AIB) Phase II Report related to the Feb. 14, 2014, radiological event at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico.

  3. WIPP waste characterization program sampling and analysis guidance manual

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Waste Characterization Program Sampling and Analysis Guidance Manual (Guidance Manual) provides a unified source of information on the sampling and analytical techniques that enable Department of Energy (DOE) facilities to comply with the requirements established in the current revision of the Quality Assurance Program Plan (QAPP) for the WIPP Experimental-Waste Characterization Program (the Program). This Guidance Manual includes all of the sampling and testing methodologies accepted by the WIPP Project Office (DOE/WPO) for use in implementing the Program requirements specified in the QAPP. This includes methods for characterizing representative samples of transuranic (TRU) wastes at DOE generator sites with respect to the gas generation controlling variables defined in the WIPP bin-scale and alcove test plans, as well as waste container headspace gas sampling and analytical procedures to support waste characterization requirements under the WIPP test program and the Resource Conservation and Recovery Act (RCRA). The procedures in this Guidance Manual are comprehensive and detailed and are designed to provide the necessary guidance for the preparation of site specific procedures. The use of these procedures is intended to provide the necessary sensitivity, specificity, precision, and comparability of analyses and test results. The solutions to achieving specific program objectives will depend upon facility constraints, compliance with DOE Orders and DOE facilities' operating contractor requirements, and the knowledge and experience of the TRU waste handlers and analysts. With some analytical methods, such as gas chromatography/mass spectrometry, the Guidance Manual procedures may be used directly. With other methods, such as nondestructive/destructive characterization, the Guidance Manual provides guidance rather than a step-by-step procedure.

  4. In-Situ Testing and Performance Assessment of a Redesigned WIPP Panel Closure - 13192

    SciTech Connect (OSTI)

    Klein, Thomas; Patterson, Russell; Camphouse, Chris; Herrick, Courtney; Kirchner, Thomas; Malama, Bwalya; Zeitler, Todd; Kicker, Dwayne

    2013-07-01

    There are two primary regulatory requirements for Panel Closures at the Waste Isolation Pilot Plant (WIPP), the nation's only deep geologic repository for defense related Transuranic (TRU) and Mixed TRU waste. The Federal requirement is through 40 CFR 191 and 194, promulgated by the U.S. Environmental Protection Agency (EPA). The state requirement is regulated through the authority of the Secretary of the New Mexico Environment Department (NMED) under the New Mexico Hazardous Waste Act (HWA), New Mexico Statutes Annotated (NMSA) 1978, chap. 74-4-1 through 74-4-14, in accordance with the New Mexico Hazardous Waste Management Regulations (HWMR), 20.4.1 New Mexico Annotated Code (NMAC). The state regulations are implemented for the operational period of waste emplacement plus 30 years whereas the federal requirements are implemented from the operational period through 10,000 years. The 10,000 year federal requirement is related to the adequate representation of the panel closures in determining long-term performance of the repository. In Condition 1 of the Final Certification Rulemaking for 40 CFR Part 194, the EPA required a specific design for the panel closure system. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has requested, through the Planned Change Request (PCR) process, that the EPA modify Condition 1 via its rulemaking process. The DOE has also requested, through the Permit Modification Request (PMR) process, that the NMED modify the approved panel closure system specified in Permit Attachment G1. The WIPP facility is carved out of a bedded salt formation 655 meters below the surface of southeast New Mexico. Condition 1 of the Final Certification Rulemaking specifies that the waste panels be closed using Option D which is a combination of a Salado mass concrete (SMC) monolith and an isolation/explosion block wall. The Option D design was also accepted as the panel closure of choice by the NMED. After twelve years of waste handling

  5. WIPP - Passive Institutional Controls (PICs) Media

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Geographic Salon.com Related Articles Physical Stability of Long-term Surface Markers Hanford - Richland , WA Report Desert Space Yucca Mountain Warning Sign Design ...

  6. Weatherization Innovation Pilot Program (WIPP): Technical Assistance Summary

    SciTech Connect (OSTI)

    Hollander, A.

    2014-09-01

    The U.S. Department of Energy (DOE) Energy Efficiency and Renewable Energy (EERE) Weatherization and Intergovernmental Programs Office (WIPO) launched the Weatherization Innovation Pilot Program (WIPP) to accelerate innovations in whole-house weatherization and advance DOE's goal of increasing the energy efficiency and health and safety of low-income residences without the utilization of additional taxpayer funding. Sixteen WIPP grantees were awarded a total of $30 million in Weatherization Assistance Program (WAP) funds in September 2010. These projects focused on: including nontraditional partners in weatherization service delivery; leveraging significant non-federal funding; and improving the effectiveness of low-income weatherization through the use of new materials, technologies, behavior-change models, and processes.

  7. Microsoft Word - WIPP Update 12.9.14.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 9 , 2 014 WIPP e mployees e ncounter o dor w hile m onitoring w aste c ontainers Late l ast w eek, f our w aste h andling t echnicians a t t he W aste I solation P ilot P lant ( WIPP) w ere p erforming s urface temperature m easurements o n t ransuranic w aste c ontainers i n t he W aste H andling B ay w hen t hey e ncountered an a bnormal o dor. T he o dor w as d escribed a s a " cleaning s olution---like" o dor, s imilar t o o dors t hat h ave b een detected i n t he p ast w

  8. Comparative study of Waste Isolation Pilot Plant (WIPP) transportation alternatives

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    WIPP transportation studies in the Final Supplement Environmental Impact Statement for WIPP are the baseline for this report. In an attempt to present the most current analysis, this study incorporates the most relevant data available. The following three transportation options are evaluated for the Disposal Phase, which is assumed to be 20 years: Truck shipments, consisting of a tractor and trailer, with three TRUPACT-IIs or one RH-72B; Regular commercial train shipments consisting of up to three railcars carrying up to 18 TRUPACT-IIs or up to six RH-72Bs; Dedicated train shipments consisting of a locomotive, an idle car, railcars carrying 18 TRUPACT-IIs or six RH-72Bs, another idle car, and a caboose or passenger car with an emergency response specialist. No other cargo is carried. This report includes: A consideration of occupational and public risks and exposures, and other environmental impacts; A consideration of emergency response capabilities; and An extimation of comparative costs.

  9. SELECTION OF SURPLUS PLUTONIUM MATERIALS FOR DISPOSITION TO WIPP

    SciTech Connect (OSTI)

    Allender, J.; Mcclard, J.; Christopher, J.

    2012-06-08

    The U.S. Department of Energy (DOE) is preparing a Surplus Plutonium Disposition (SPD) Supplemental Environmental Impact Statement (SEIS). Included in the evaluation are up to 6 metric tons (MT) of plutonium in the form of impure oxides and metals for which a disposition plan has not been decided, among options that include preparation as feed for the Mixed Oxide Fuel Fabrication Facility; disposing to high-level waste through the Savannah River Site (SRS) HB Line and H Canyon; can-in-canister disposal using the SRS Defense Waste Processing Facility; and preparation for disposal at the Waste Isolation Pilot Plant (WIPP). DOE and SRS have identified at least 0.5 MT of plutonium that, because of high levels of chemical and isotopic impurities, is impractical for disposition by methods other than the WIPP pathway. Characteristics of these items and the disposition strategy are discussed.

  10. Cookoff modeling of a WIPP waste drum (68660) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cookoff modeling of a WIPP waste drum (68660) Cookoff modeling of a WIPP waste drum (68660) This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. The Technical Assessment Team (TAT) has undertaken a deliberative investigation process to understand and determine the cause of the February 14, 2014 WIPP release event. This document corresponds to

  11. Waste Isolation Pilot Plant (WIPP) Site Cleanup By the Numbers | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy (WIPP) Site Cleanup By the Numbers Waste Isolation Pilot Plant (WIPP) Site Cleanup By the Numbers Waste Isolation Pilot Plant (WIPP) Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an

  12. Resuming Operations at WIPP and the National TRU Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy WIPP and the National TRU Program Resuming Operations at WIPP and the National TRU Program Presentation from the 2015 DOE National Cleanup Workshop by Phil Breidenbach, Project Manager, Nuclear Waste Partnership, LLC. Resuming Operations at WIPP and the National TRU Program (799 KB) More Documents & Publications Voluntary Protection Program Onsite Review, Nuclear Waste Partnership, LLC - March 2015 Preliminary Notice of Violation, Nuclear Waste Partnership, LLC Testimony of Mark

  13. DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT 1. CONTRACT PURPOSE The major purpose of this contract is to operate and maintain the Waste Isolation Pilot Plant (WIPP) and to implement the DOE's National Transuranic Waste program (NTP). The overall mission of the WIPP and the National Transuranic Waste Program is to protect human health and the environment by safe management, retrieval, characterization, transportation, and disposal of approved wastes. 2. BACKGROUND 2.1

  14. DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C-1 SECTION C PERFORMANCE WORK STATEMENT 1. CONTRACT PURPOSE The major purpose of this contract is to operate and maintain the Waste Isolation Pilot Plant (WIPP) and to implement the DOE's National Transuranic Waste program (NTP). The overall mission of the WIPP and the National Transuranic Waste Program is to protect human health and the environment by safe management, retrieval, characterization, transportation, and disposal of approved wastes. 2. BACKGROUND 2.1 Background: The WIPP is located

  15. WIPP Team Chosen as Overall Champion at National Mine Rescue Competition |

    Office of Environmental Management (EM)

    Department of Energy Team Chosen as Overall Champion at National Mine Rescue Competition WIPP Team Chosen as Overall Champion at National Mine Rescue Competition August 28, 2014 - 12:00pm Addthis CBFO Manager Joe Franco (sixth from left) with the WIPP Red Team and competition officials at the 2014 National Metal and Nonmetal Mine Rescue Competition. CBFO Manager Joe Franco (sixth from left) with the WIPP Red Team and competition officials at the 2014 National Metal and Nonmetal Mine Rescue

  16. WIPP Concludes Zone Recovery Activities for Panel 7 Disposal Pathway

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    24, 2015 WIPP Concludes Zone Recovery Activities for Panel 7 Disposal Pathway After months of catch-up rock bolting and contamination mitigation, zone recovery activities along the pathway to Panel 7 have been completed. Panel 7, which consists of seven disposal rooms (see map below), will be the active disposal area when waste emplacement activities resume. Initial closure of Panel 7 Room 7 was completed in May 2015. Although the pathway has been established, a significant number of activities,

  17. WIPP Selected Charter Member of National Environmental Performance Track Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Selected Charter Member of National Environmental Performance Track Program CARLSBAD, N.M., December 14, 2000 - The U.S. Environmental Protection Agency (EPA) has selected the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) as a charter member of the National Environmental Performance Track Program. EPA designed the performance track program to recognize and encourage facilities that go beyond compliance with regulatory requirements. These top performers attain levels of

  18. WIPP contractor receives VPP Legacy of Stars Award 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management and Operating Contractor Recognized for Continuous Safety Performance CARLSBAD, N.M., September 20, 2013 - The U.S. Department of Energy (DOE) recognized Nuclear Waste Partnership LLC (NWP), the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor, with the Voluntary Protection Program (VPP) Legacy of Stars Award in latter August 2013. "Safety is central to everything we do, and achieving this elite designation validates our work and the safety-focused

  19. Identification of issues relevant to the first recertification of WIPP

    SciTech Connect (OSTI)

    Allen, Lawrence E.; Silva, Matthew K.; Channell, James K.

    2002-09-30

    One goal of the WIPP Land Withdrawal Act was to assure the safe disposal of the nation’s defense transuranic waste into a deep repository in southeast New Mexico. The governing legislation required the U.S. Department of Energy (DOE) to provide to the U.S. Environmental Protection Agency (EPA) analyses of the anticipated performance of the repository. Disposal operations could not begin until the EPA determined that the project demonstrated compliance with EPA Standards (40 CFR 191) and EPA Criteria (40 CFR 194) for such disposal. The Land Withdrawal Act inherently recognized that the EPA Certification would have to rely on best available knowledge at the time when the application was submitted. The Act also recognized that after the initial certification of WIPP and start of disposal operations, operating experience and ongoing research would result in new technical and scientific information. Thus, the legislation requires recertification of the WIPP every five years, following the first receipt of waste. This report updates issues that the Environmental Evaluation Group (EEG) considers important as the Department of Energy (DOE) works towards the first recertification. These issues encompass a variety of technical areas including actinide solubility, fluid injection scenarios, solution mining, Culebra flow and transport, spallings modeling, and non-random waste emplacement. Given the 24,000-year half life of 239Pu, understanding the characteristics of plutonium in the WIPP environment is obviously important to the validity of long-term performance assessment of the repository. Some uncertainty remains in the understanding of the persistence of higher oxidation states because of reliance on modeling (with its associated assumptions) and limited experimental results. The EEG recommends additional experimental work towards parameters for a proposed conceptual kinetic model of plutonium solubility. In addition, the EEG recommends an intrusion scenario

  20. Microsoft Word - WIPP Marks A Decade of Safe Disposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Marks a Decade of Safe Disposal CARLSBAD, N.M., March 25, 2009 - The nation's first and only deep geologic repository for the disposal of defense-related transuranic (TRU) radioactive waste has safely operated for more than 10 years. The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) began disposal operations March 26, 1999 and today serves as an international model for radioactive waste management. "What this project has accomplished is remarkable," said DOE

  1. Microsoft Word - WIPP Update 3_27_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP UPDATE: March 27, 2014 New Sampling Plan Establishes 10 Additional Locations A new environmental sampling plan has been developed that includes 10 additional sampling locations in Hobbs, Artesia, Loving, Eunice and other nearby communities. The stations will monitor air, soil and vegetation, where appropriate and supplement sampling efforts already underway. The Environmental Protection Agency also plans to initiate additional environmental monitoring. To read more, visit the EPA web site

  2. WIPP Security Force Recognized for Outstanding Safety | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Security Force Recognized for Outstanding Safety WIPP Security Force Recognized for Outstanding Safety May 9, 2013 - 12:00pm Addthis U.S. Department of Energy Carlsbad Field Office Manager Joe Franco (right) presents the Star of Excellence Award to Security Walls, LLC Manager Richard De Los Santos. U.S. Department of Energy Carlsbad Field Office Manager Joe Franco (right) presents the Star of Excellence Award to Security Walls, LLC Manager Richard De Los Santos. Media Contact Deb

  3. WIPP Compliance Certification Application calculations parameters. Part 2: Parameter documentation

    SciTech Connect (OSTI)

    Howarth, S.M.

    1997-11-14

    The Waste Isolation Pilot Plant (WIPP) in southeast New Mexico has been studied as a transuranic waste repository for the past 23 years. During this time, an extensive site characterization, design, construction, and experimental program was completed, which provided in depth understanding of the dominant processes that are most likely to influence the containment of radionuclides for 10,000 years. Nearly 1,500 parameters were developed using information gathered from this program and were input to numerical models for WIPP Compliance Certification Application (CCA) Performance Assessment (PA) calculations. The CCA probability models require input parameters that are defined by a statistical distribution. Developing parameters begins with the assignment of an appropriate distribution type, which is dependent on the type, magnitude, and volume of data or information available. Parameter development may require interpretation or statistical analysis of raw data, combining raw data with literature values, scaling laboratory or field data to fit code grid mesh sizes, or other transformations. Documentation of parameter development is designed to answer two questions: What source information was used to develop this parameter? and Why was this particular data set/information used? Therefore, complete documentation requires integrating information from code sponsors, parameter task leaders, performance assessment analysts, and experimental principal investigators. This paper, Part 2 of 2 parts, contains a discussion of the WIPP CCA PA Parameter Tracking System, document traceability and retrievability, and lessons learned from related audits and reviews.

  4. Waste Isolation Pilot Plant (WIPP) site gravity survey and interpretation

    SciTech Connect (OSTI)

    Barrows, L.J.; Fett, J.D.

    1983-04-01

    A portion of the WIPP site has been extensively surveyed with high-precision gravity. The main survey (in T22S, R31E) covered a rectangular area 2 by 4-1/3 mi encompassing all of WIPP site Zone II and part of the disturbed zone to the north of the site. Stations were at 293-ft intervals along 13 north-south lines 880 ft apart. The data are considered accurate to within a few hundredths of a milligal. Long-wavelength gravity anomalies correlate well with seismic time structures on horizons below the Castile Formation. Both the gravity anomalies and the seismic time structures are interpreted as resulting from related density and velocity variations within the Ochoan Series. Shorter wavelength negative gravity anomalies are interpreted as resulting from bulk density alteration in the vicinity of karst conduits. The WIPP gravity survey was unable to resolve low-amplitude, long-wavelength anomalies that should result from the geologic structures within the disturbed zone. It did indicate the degree and character of karst development within the surveyed area.

  5. DE-SOL-0002555 WIPP Solicitation J-26 PART III - LIST OF DOCUMENTS...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AND OTHER ATTACHMENTS SECTION J ATTACHMENT G: SUMMARY OF CONTRACT DELIVERABLES DE-SOL-0002555 WIPP Solicitation J-27 SUMMARY OF CONTRACT DELIVERABLES Deliverable Reference...

  6. DE-SOL-0002555 WIPP Solicitation J-23 PART III - LIST OF DOCUMENTS...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OTHER ATTACHMENTS SECTION J ATTACHMENT F: GUIDANCE FOR PREPARATION OF DIVERSITY PLAN DE-SOL-0002555 WIPP Solicitation J-24 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER...

  7. SEE HOW WE RUN...At WIPP, We Really Mean Business

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of a deep geologic repository. Dedicated employees overcame years of delays and criticism that the repository might never open. Running WIPP like a business depends...

  8. Microsoft Word - NR WIPP TECH ASSISTANCE RFQ MAY 3 2010.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP's mission is to safely characterize, transport, and dispose of radioactive waste resulting from defense activities. The CBFO is responsible for ensuring safe and...

  9. 100th WIPP Quarterly Meeting continues tradition of consultation and cooperation with state

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    75) 234-7327 www.wipp.energy.gov U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 DOENews For immediate release 100 th WIPP Quarterly Meeting continues tradition of consultation and cooperation with state CARLSBAD, N.M., October 10, 2007 - The Waste Isolation Pilot Plant (WIPP) reached a major milestone in its consultation and cooperation with the state of New Mexico and stakeholders. Today, WIPP marked the 100 th gathering of

  10. DE-EM-0001971 WIPP M&O C-1 SECTION C PERFORMANCE WORK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... 2035), the WIPP shall enter its decommissioning phase ... The Contractor shall also comply with the terms and ... without sound records search and retrieval capabilities ...

  11. Microsoft PowerPoint - WIPP Town Hall Meeting 9-3-15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bryson * Radiation presentation - Walter MacMillan * Audience questions * In house * Internet * Closing comments - Dana Bryson www.energy.govEM 3 Update on CBFO and WIPP...

  12. DOE Completes Disposal Operations In Panel 5 of the WIPP Underground |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Disposal Operations In Panel 5 of the WIPP Underground DOE Completes Disposal Operations In Panel 5 of the WIPP Underground August 15, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - The U.S. Department of Energy (DOE) announced that disposal operations in Panel 5 of the Waste Isolation Pilot Plant (WIPP) underground repository are complete. Last month, the final contact-handled transuranic (CH-TRU) waste shipment was

  13. WIPP Doubles Solid Waste Reduction Rate in Fiscal Year 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Doubles Solid Waste Reduction Rate in Fiscal Year 2013 WIPP Doubles Solid Waste Reduction Rate in Fiscal Year 2013 December 5, 2013 - 12:00pm Addthis WIPP environmental and operations personnel gather next to pallets that will be provided to the local community as part of WIPP’s wood waste diversion program. WIPP environmental and operations personnel gather next to pallets that will be provided to the local community as part of WIPP's wood waste diversion program. CARLSBAD, N.M.

  14. WIPP | U.S. Department of Energy | Waste Isolation Pilot Plant...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the Waste Isolation Pilot Plant and the NationalTransuranic (TRU) Program. ... Overview opening screen The Waste Isolation Pilot Plant, or WIPP, safely disposes of the ...

  15. Supplemental Ventilation System Arrives at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    fan will be positioned near the primary air intake shaft where it will be used to draw approximately 130,000 cubic feet per minute (cfm) of surface air into the underground....

  16. WIPP Update 4_12_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ata yesterday t hat reveals n o c ontamination i n surface w ater s amples c ollected f rom t hree a rea r eservoirs (see a ttached). CEMRC's testing s hows t hat t he a reas p...

  17. Resource conservation and recovery act draft hazardous waste facility permit: Waste Isolation Pilot Plant (WIPP). Attachments: Volume 4 of 4

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    Volume IV contains the following attachments for Module IV: VOC monitoring plan for bin-room tests (Appendix D12); bin emission control and VOC monitoring system drawings; bin scale test room ventilation drawings; WIPP supplementary roof support system, underground storage area, room 1, panel 1, DOE/WIPP 91-057; and WIPP supplementary roof support system, room 1, panel 1, geotechnical field data analysis bi-annual report, DOE/WIPP 92-024.

  18. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th ...

  19. How Does the WIPP Shutdown Impact New Mexico, Idaho, and South Carolina

    Broader source: Energy.gov [DOE]

    Southwest Research and Information Center presented on the Impact of the WIPP shutdown on the states of New Mexico, Idaho, and South Carolina, the presenter was Don Hancock. Information provided covered: budget numbers, waste storage numbers, safety, and what needs to be done to reopen WIPP.

  20. Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP`s environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence.

  1. Rocky Flats 100th Shipments Arrives at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RELEASE Rocky Flats For Immediate Release Contact: Karen Lutz, DOE RFFO, 303/966-4546 01-08 Jennifer Thompson, Kaiser-Hill, 303/966-6285 Kate Foster, Westinghouse TRU Solutions, 505/234-7589 Rocky Flats' 100 th Shipment Arrives at Waste Isolation Pilot Plant DENVER, Colo., March 14, 2001- The 100 th shipment of transuranic waste from the U.S. Department of Energy's (DOE) Rocky Flats Environmental Technology Site (RFETS) has arrived at DOE's Waste Isolation Pilot Plant (WIPP) in New Mexico. Rocky

  2. WIPP to Hold Public Meetings on Permit Modification Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 28, 2016 WIPP to Hold Public Meetings on Permit Modification Request The U.S. Department of Energy Carlsbad Field Office and Nuclear Waste Partnership LLC (Permittees) will conduct two public meetings on Tuesday, June 28, and Thursday, June 30, 2016. Tuesday, June 28, 2016 Thursday, June 30, 2016 3:00 to 5:00 P.M. 5:00 to 7:00 P.M. Courtyard by Marriott Skeen-Whitlock Building 3347 Cerrillos Road 4021 National Parks Highway Santa Fe, New Mexico Carlsbad, New Mexico The purpose of the

  3. Microsoft Word - FINAL WIPP REPORT-5-6-2015

    Office of Environmental Management (EM)

    Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL) H. M. Ajo F. Fondeur L. W. Brown C. M Gregory C. J. Coleman M. A. Jones S. L. Crump D. M. Missimer C. C. Diprete P. E. O'Rourke D. P. Diprete T. L. White A. A. Ekechukwu J. E. Young December 2014 SRNL-STI-2014-00617 SRNL-STI-2014-00617 Revision 0 ii DISCLAIMER This work was prepared under an agreement with and funded by the U.S. Government. Neither the U.S. Government or its employees,

  4. WIPP Shares Expertise with Salt Club Members | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Shares Expertise with Salt Club Members WIPP Shares Expertise with Salt Club Members November 26, 2013 - 12:00pm Addthis Carlsbad Field Office’s Abe Van Luik, third from right, examines rock salt taken from the Morsleben mine in Germany. Carlsbad Field Office's Abe Van Luik, third from right, examines rock salt taken from the Morsleben mine in Germany. CARLSBAD, N.M. - EM's Carlsbad Field Office (CBFO) participated in the second meeting of the Nuclear Energy Agency's (NEA) Salt Club and the

  5. WIPP Benchmark calculations with the large strain SPECTROM codes

    SciTech Connect (OSTI)

    Callahan, G.D.; DeVries, K.L.

    1995-08-01

    This report provides calculational results from the updated Lagrangian structural finite-element programs SPECTROM-32 and SPECTROM-333 for the purpose of qualifying these codes to perform analyses of structural situations in the Waste Isolation Pilot Plant (WIPP). Results are presented for the Second WIPP Benchmark (Benchmark II) Problems and for a simplified heated room problem used in a parallel design calculation study. The Benchmark II problems consist of an isothermal room problem and a heated room problem. The stratigraphy involves 27 distinct geologic layers including ten clay seams of which four are modeled as frictionless sliding interfaces. The analyses of the Benchmark II problems consider a 10-year simulation period. The evaluation of nine structural codes used in the Benchmark II problems shows that inclusion of finite-strain effects is not as significant as observed for the simplified heated room problem, and a variety of finite-strain and small-strain formulations produced similar results. The simplified heated room problem provides stratigraphic complexity equivalent to the Benchmark II problems but neglects sliding along the clay seams. The simplified heated problem does, however, provide a calculational check case where the small strain-formulation produced room closures about 20 percent greater than those obtained using finite-strain formulations. A discussion is given of each of the solved problems, and the computational results are compared with available published results. In general, the results of the two SPECTROM large strain codes compare favorably with results from other codes used to solve the problems.

  6. Nuclear waste repository transparency technology test bed demonstrations at WIPP

    SciTech Connect (OSTI)

    BETSILL,J. DAVID; ELKINS,NED Z.; WU,CHUAN-FU; MEWHINNEY,JAMES D.; AAMODT,PAUL

    2000-01-27

    Secretary of Energy, Bill Richardson, has stated that one of the nuclear waste legacy issues is ``The challenge of managing the fuel cycle's back end and assuring the safe use of nuclear power.'' Waste management (i.e., the back end) is a domestic and international issue that must be addressed. A key tool in gaining acceptance of nuclear waste repository technologies is transparency. Transparency provides information to outside parties for independent assessment of safety, security, and legitimate use of materials. Transparency is a combination of technologies and processes that apply to all elements of the development, operation, and closure of a repository system. A test bed for nuclear repository transparency technologies has been proposed to develop a broad-based set of concepts and strategies for transparency monitoring of nuclear materials at the back end of the fuel/weapons cycle. WIPP is the world's first complete geologic repository system for nuclear materials at the back end of the cycle. While it is understood that WIPP does not currently require this type of transparency, this repository has been proposed as realistic demonstration site to generate and test ideas, methods, and technologies about what transparency may entail at the back end of the nuclear materials cycle, and which could be applicable to other international repository developments. An integrated set of transparency demonstrations was developed and deployed during the summer, and fall of 1999 as a proof-of-concept of the repository transparency technology concept. These demonstrations also provided valuable experience and insight into the implementation of future transparency technology development and application. These demonstrations included: Container Monitoring Rocky Flats to WIPP; Underground Container Monitoring; Real-Time Radiation and Environmental Monitoring; Integrated level of confidence in the system and information provided. As the world's only operating deep geologic

  7. Microsoft Word - Los Alamos National Laboratory ships remote-handled transuranic waste to WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Los Alamos National Laboratory Ships Remote-Handled Transuranic Waste to WIPP CARLSBAD, N.M., June 3, 2009 - Cleanup of the nation's defense-related transuranic (TRU) waste has reached an important milestone. Today, the first shipment of remote-handled (RH) TRU waste from Los Alamos National Laboratory (LANL) in New Mexico arrived safely at the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) in the southeast corner of the state. "Shipping this waste to WIPP is important

  8. Microsoft Word - Final Release of Two Photos and Captions for WIPP Exhibit Debut _2_.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE- ###DRMMYY Photos of New WIPP Transportation Exhibit's Debut At the National Museum of Nuclear Science and History CARLSBAD, N.M., November 9, 2011- Photo #1 caption: A visitor takes a look at the new Waste Isolation Pilot Plant (WIPP) transportation exhibit that was unveiled November 5, 2011 in Albuquerque, N.M. at the National Museum of Nuclear Science and History. A cutaway of the TRUPACT-II, a transportation package used for shipping transuranic waste to WIPP near Carlsbad, N.M., is the

  9. DOE Awards Contract for WIPP Mobile Loading Unit Services | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy WIPP Mobile Loading Unit Services DOE Awards Contract for WIPP Mobile Loading Unit Services August 27, 2012 - 12:00pm Addthis Media Contacts Bill Taylor Bill.Taylor@srs.gov 803-952-8564 Deb Gill Deb.Gill@wipp.ws 575-234-7270 Cincinnati - The U.S. Department of Energy (DOE) today awarded a competitive small business contract to Celeritex, LLC, (a Joint Venture between Project Services Group, LLC and DeNuke Contracting Services Inc.) of Suwanee, Georgia. The contract is to provide

  10. WIPP Receives First Remote-Handled Waste Shipment From Sandia Labs |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy First Remote-Handled Waste Shipment From Sandia Labs WIPP Receives First Remote-Handled Waste Shipment From Sandia Labs December 21, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) has received the first of eight planned defense-related remote-handled transuranic (RH-TRU) waste shipments from Sandia National Laboratories (SNL) in Albuquerque. The

  11. Mechanical Modeling of a WIPP Drum Under Pressure

    SciTech Connect (OSTI)

    Smith, Jeffrey A.

    2014-11-25

    Mechanical modeling was undertaken to support the Waste Isolation Pilot Plant (WIPP) technical assessment team (TAT) investigating the February 14th 2014 event where there was a radiological release at the WIPP. The initial goal of the modeling was to examine if a mechanical model could inform the team about the event. The intention was to have a model that could test scenarios with respect to the rate of pressurization. It was expected that the deformation and failure (inability of the drum to contain any pressure) would vary according to the pressurization rate. As the work progressed there was also interest in using the mechanical analysis of the drum to investigate what would happen if a drum pressurized when it was located under a standard waste package. Specifically, would the deformation be detectable from camera views within the room. A finite element model of a WIPP 55-gallon drum was developed that used all hex elements. Analyses were conducted using the explicit transient dynamics module of Sierra/SM to explore potential pressurization scenarios of the drum. Theses analysis show similar deformation patterns to documented pressurization tests of drums in the literature. The calculated failure pressures from previous tests documented in the literature vary from as little as 16 psi to 320 psi. In addition, previous testing documented in the literature shows drums bulging but not failing at pressures ranging from 69 to 138 psi. The analyses performed for this study found the drums failing at pressures ranging from 35 psi to 75 psi. When the drums are pressurized quickly (in 0.01 seconds) there is significant deformation to the lid. At lower pressurization rates the deformation of the lid is considerably less, yet the lids will still open from the pressure. The analyses demonstrate the influence of pressurization rate on deformation and opening pressure of the drums. Analyses conducted with a substantial mass on top of the closed drum demonstrate that the

  12. WIPP Facility Work Plan for Solid Waste Management Units

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  13. EA-1340: Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site, Carlsbad, New Mexico

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to make maximum use of existing U.S. Department of Energy Waste Isolation Pilot Plant (WIPP) facilities to further the scientific...

  14. DE-EM-0001971 WIPP M&O J-8 PART III - LIST OF DOCUMENTS, EXHIBITS...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AND MEASUREMENT PLAN (PEMP) DE-EM-0001971 WIPP M&O J-9 Draft PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) OCTOBER 1 (2012) through SEPTEMBER 30, (2013) Contract No. ...

  15. DOE Hosts German Energy Official, Signs MOU to Share WIPP Information

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – A high-ranking energy official from Germany formalized a partnership between her country and the United States during a recent visit to the Waste Isolation Pilot Plant (WIPP).

  16. Carlsbad Field Office Recognized by New Mexico and DOE for Environmental Excellence at WIPP

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – The Department of Energy (DOE) Carlsbad Field Office (CBFO) was selected for top recognition for environmental stewardship and for reducing energy, water and paper usage at the DOE’s Waste Isolation Pilot Plant (WIPP).

  17. Microsoft Word - DOE-WIPP-02-3122-REV7 4-FINAL

    Office of Environmental Management (EM)

    WIPP-02-3122 TRANSURANIC WASTE ACCEPTANCE CRITERIA FOR THE WASTE ISOLATION PILOT PLANT Revision 7.4 Effective Date: April 22, 2013 U.S. Department of Energy Carlsbad Field Office 2 ...

  18. Microsoft Word - DOE-WIPP-02-3122-REV8.0-FINAL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP-02-3122 TRANSURANIC WASTE ACCEPTANCE CRITERIA FOR THE WASTE ISOLATION PILOT PLANT ... CRITERIA FOR THE WASTE ISOLATION PILOT PLANT Revision 8.0 Effective Date: July 5, 2016 ...

  19. Microsoft Word - WIPP Update 10_28_14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    being conducted to identify potential ground control issues and ensure a safe and secure working environment. Finally, maintenance crews are cleaning and inspecting electrical...

  20. Radiological Source Term Estimates for the February 14, 2014 WIPP Release

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Event | Department of Energy Radiological Source Term Estimates for the February 14, 2014 WIPP Release Event Radiological Source Term Estimates for the February 14, 2014 WIPP Release Event This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. The Technical Assessment Team (TAT) has undertaken a deliberative investigation process to understand

  1. WIPP Instructors to Provide Specialized Training For Indiana Emergency Response Professionals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Indiana Emergency Response Professionals CARLSBAD, N.M., January 25, 2001 - Trainers from the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) will be in Indianapolis, Indiana, January 29-30 and February 1-2 to teach emergency response professionals what to do should they arrive at an accident involving a WIPP shipment. Transuranic radioactive waste shipments from DOE's Battelle Columbus Laboratories in Columbus, Ohio, are tentatively scheduled to begin in 2002. Trucks coming

  2. Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    40 Department of Energy Carlsbad Field Office Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site Final January 2001 U.S. Department of Energy Final Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site i TABLE OF CONTENTS CHAPTER 1: INTRODUCTION AND STATEMENT OF PURPOSE AND NEED..........1-1 1.1 HISTORY AND BACKGROUND........................................................1-1 1.2 PURPOSE

  3. 2014-02 "Institution of Measures to Help Ensure WIPP and LANL Transuranic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disposal Operations Remain Continually Operational" | Department of Energy 2 "Institution of Measures to Help Ensure WIPP and LANL Transuranic Disposal Operations Remain Continually Operational" 2014-02 "Institution of Measures to Help Ensure WIPP and LANL Transuranic Disposal Operations Remain Continually Operational" It is the intent of the NNMCAB to assure that operations at DOE and LANL regarding the handling, transport, and disposal of transuranic waste from

  4. Public invited to comment on additional proposed modications to WIPP hazardous waste permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Public Invited to Comment on Additional Proposed Modifications To WIPP Hazardous Waste Permit CARLSBAD, N.M., April 26, 2000 - The public is invited to comment on additional proposed modifications to the hazardous waste facility permit for the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). Earlier this month, DOE and the Westinghouse Waste Isolation Division requested -- through three Class 2 permit modification submittals -- that the New Mexico Environment Department

  5. Actinide chemistry research supporting the Waste Isolation Pilot Plant (WIPP): FY94 results

    SciTech Connect (OSTI)

    Novak, C.F.

    1995-08-01

    This document contains six reports on actinide chemistry research supporting the Waste Isolation Pilot Plant (WIPP). These reports, completed in FY94, are relevant to the estimation of the potential dissolved actinide concentrations in WIPP brines under repository breach scenarios. Estimates of potential dissolved actinide concentrations are necessary for WIPP performance assessment calculations. The specific topics covered within this document are: the complexation of oxalate with Th(IV) and U(VI); the stability of Pu(VI) in one WIPP-specific brine environment both with and without carbonate present; the solubility of Nd(III) in a WIPP Salado brine surrogate as a function of hydrogen ion concentration; the steady-state dissolved plutonium concentrations in a synthetic WIPP Culebra brine surrogate; the development of a model for Nd(III) solubility and speciation in dilute to concentrated sodium carbonate and sodium bicarbonate solutions; and the development of a model for Np(V) solubility and speciation in dilute to concentrated sodium Perchlorate, sodium carbonate, and sodium chloride media.

  6. Status Report on the Microbial Characterization of Halite and Groundwater Samples from the WIPP

    SciTech Connect (OSTI)

    Swanson, Juliet S.; Reed, Donald T.; Ams, David A.; Norden, Diana; Simmons, Karen A.

    2012-07-10

    This report summarizes the progress made in the ongoing task of characterizing the microbial community structures within the WIPP repository and in surrounding groundwaters. Through cultivation and DNA-based identification, the potential activity of these organisms is being inferred, thus leading to a better understanding of their impact on WIPP performance. Members of the three biological domains - Bacteria, Archaea, and Eukarya (in this case, Fungi) - that are associated with WIPP halite have been identified. Thus far, their activity has been limited to aerobic respiration; anaerobic incubations are underway. WIPP halite constitutes the near-field microbial environment. We expect that microbial activity in this setting will proceed from aerobic respiration, through nitrate reduction to focus on sulfate reduction. This is also the current WIPP performance assessment (PA) position. Sulfate reduction can occur at extremely high ionic strengths, and sulfate is available in WIPP brines and in the anhydrite interbeds. The role of methanogenesis in the WIPP remains unclear, due to both energetic constraints imposed by a high-salt environment and substrate selectivity, and it is no longer considered in PA. Archaea identified in WIPP halite thus far fall exclusively within the family Halobacteriaceae. These include Halobacterium noricense, cultivated from both low- and high-salt media, and a Halorubrum-like species. The former has also been detected in other salt mines worldwide; the latter likely constitutes a new species. Little is known of its function, but it was prevalent in experiments investigating the biodegradation of organic complexing agents in WIPP brines. Bacterial signatures associated with WIPP halite include members of the phylum Proteobacteria - Halomonas, Pelomonas, Limnobacter, and Chromohalobacter - but only the latter has been isolated. Also detected and cultivated were Salinicoccus and Nesterenkonia spp. Fungi were also isolated from halite. Although

  7. 2011-07 "Maximum Utilization of WIPP by Increasing MDA G TRU Shipments" |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 7 "Maximum Utilization of WIPP by Increasing MDA G TRU Shipments" 2011-07 "Maximum Utilization of WIPP by Increasing MDA G TRU Shipments" The intent of this recommendation is to ensure optimization of WIPP shipment schedules while helping to keep commitments to Consent Order milestones at MDA-G. Rec 2011-07 - July 27, 2011 (78.0

  8. Resource Conservation and Recovery Act: Part B Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 5, Revision 1

    SciTech Connect (OSTI)

    Not Available

    1991-12-31

    This report, part of the permit application for the WIPP facility, presents engineering drawings and engineering change orders for the facility. (CBS)

  9. WIPP Facility Work Plan for Solid Waste Management Units

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-02-14

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  10. Resource Conservation and Recovery Act, Part B Permit Application [of the Waste Isolation Pilot Plant (WIPP)]. Volume 2, Revision 1.0

    SciTech Connect (OSTI)

    Not Available

    1990-12-31

    This report, Part B ( Vol. 2) of the permit application for the WIPP facility, contains information related to the WIPP site on hydrology, geology, maps, and rock salt properties.

  11. History of geophysical studies at the Waste Isolation Pilot Plant (WIPP), southeastern New Mexico

    SciTech Connect (OSTI)

    Borns, D.J.

    1997-03-05

    A variety of geophysical methods including the spectrum of seismic, electrical, electromagnetic and potential field techniques have supported characterization, monitoring and experimental studies at the Waste Isolation Pilot Plant (WIPP). The geophysical studies have provided significant understanding of the nature of site deformation, tectonics and stability. Geophysical methods have delineated possible brine reservoirs beneath the underground facility and have defined the disturbed rock zone that forms around underground excavations. The role of geophysics in the WIPP project has evolved with the project. The early uses were for site characterization to satisfy site selection criteria or factors. As the regulatory framework for WIPP grew since 1980, the geophysics program supported experimental and field programs such as Salado hydrogeology and underground room systems and excavations. In summary, the major types of issues that geophysical studies addressed for WIPP are: Site Characterization; Castile Brine Reservoirs; Rustler/Dewey Lake Hydrogeology; Salado Hydrogeology; and Excavation Effects. The nature of geophysics programs for WIPP has been to support investigation rather than being the principal investigation itself. The geophysics program has been used to define conceptual models (e.g., the Disturbed Rock Zone-DRZ) or to test conceptual models (e.g., high transmissivity zones in the Rustler Formation). The geophysics program primarily supported larger characterization and experimental programs. Funding was not available for the complete documentation and interpretation. Therefore, a great deal of the geophysics survey information resides in contractor reports.

  12. Implications of the presence of petroleum resources on the integrity of the WIPP

    SciTech Connect (OSTI)

    Silva, M.K. |

    1994-06-01

    The Waste Isolation Pilot Plant (WIPP) is a facility of the US Department of Energy (DOE), designed and constructed for the permanent disposal of transuranic (TRU) defense waste. The WIPP is surrounded by reserves of potash, crude oil, and natural gas. These are attractive targets for exploratory drilling which could disrupt the integrity of the transuranic waste repository. The performance assessment calculations published to date have identified future drilling for oil and gas reserves as an event that may disrupt the repository and may release radionuclides in excess of the standards. Therefore, the probability of inadvertent human intrusion into the repository by drilling and its impact on the integrity of the repository must be carefully assessed. This report evaluates: (1) the studies funded by the DOE to examine the crude oil potential in the immediate vicinity of the WIPP; (2) the use of an elicitation exercise to predict future drilling rates for use in the calculation of the repository performance; and (3) the observed limitations of institutional controls. This report identifies the following issues that remain to be resolved: (1) the limited performance of blowout preventers after drilling into high pressure zones immediately adjacent to the WIPP Site Boundary; (2) reported problems with waterflooding operations in southeastern New Mexico; (3) reported water level rises in several wells completed in the Rustler Formation, south of the WIPP Site, possibly due to oil and gas wells or leaking injection wells; and (4) reports of inadequate well abandonment practices on BLM leases and the continued absence of enforceable regulations.

  13. Analysis of Waste Isolation Pilot Plan (WIPP) Underground and MGO Samples by the Savannah River National Laboratory (SRNL)

    SciTech Connect (OSTI)

    Young, J.; Ajo, H.; Brown, L.; Coleman, C.; Crump, S.; Diprete, C.; Diprete, D.; Ekechukwu, A.; Gregory, C.; Jones, M.; Missimer, D.; O'Rourke, P.; White, T.

    2014-12-31

    Analysis of the recent WIPP samples are summarized in this report; WIPP Cam Filters 4, 6, 9 (3, 7, 11 were analyzed with FAS-118 in a separate campaign); WIPP Drum Lip R16 C4; WIPP Standard Waste Box R15 C5; WIPP MgO R16 C2; WIPP MgO R16 C4; WIPP MgO R16 C6; LANL swipes of parent drum; LANL parent drum debris; LANL parent drum; IAEA Swipe; Unused “undeployed” Swheat; Unused “undeployed” MgO; and Masselin cloth “smears”. Analysis showed that the MgO samples were very pure with low carbonate and water content. Other samples showed the expected dominant presence of Mg, Na and Pb. Parent drum debris sample was mildly acidic. Interpretation of results is not provided in this document, but rather to present and preserve the analytical work that was performed. The WIPP Technical Analysis Team is responsible for result interpretation which will be written separately.

  14. Cookoff Modeling of a WIPP waste drum (68660)

    SciTech Connect (OSTI)

    Hobbs, Michael L.

    2014-11-24

    A waste drum located 2150 feet underground may have been the root cause of a radiation leak on February 14, 2014. Information provided to the WIPP Technical Assessment Team (TAT) was used to describe the approximate content of the drum, which included an organic cat litter (Swheat Scoop®, or Swheat) composed of 100% wheat products. The drum also contained various nitrate salts, oxalic acid, and a nitric acid solution that was neutralized with triethanolamine (TEA). CTH-TIGER was used with the approximate drum contents to specify the products for an exothermic reaction for the drum. If an inorganic adsorbent such as zeolite had been used in lieu of the kitty litter, the overall reaction would have been endothermic. Dilution with a zeolite adsorbent might be a useful method to remediate drums containing organic kitty litter. SIERRA THERMAL was used to calculate the pressurization and ignition of the drum. A baseline simulation of drum 68660 was performed by assuming a background heat source of 0.5-10 W of unknown origin. The 0.5 W source could be representative of heat generated by radioactive decay. The drum ignited after about 70 days. Gas generation at ignition was predicted to be 300-500 psig with a sealed drum (no vent). At ignition, the wall temperature increases modestly by about 1°C, demonstrating that heating would not be apparent prior to ignition. The ignition location was predicted to be about 0.43 meters above the bottom center portion of the drum. At ignition only 3-5 kg (out of 71.6 kg total) has been converted into gas, indicating that most of the material remained available for post-ignition reaction.

  15. Compaction behavior of surrogate degraded emplaced WIPP waste.

    SciTech Connect (OSTI)

    Broome, Scott Thomas; Bronowski, David R.; Kuthakun, Souvanny James; Pfeifle, Thomas W.; Herrick, Courtney Grant

    2014-03-01

    The present study results are focused on laboratory testing of surrogate waste materials. The surrogate wastes correspond to a conservative estimate of degraded Waste Isolation Pilot Plant (WIPP) containers and TRU waste materials at the end of the 10,000 year regulatory period. Testing consists of hydrostatic, triaxial, and uniaxial strain tests performed on surrogate waste recipes that were previously developed by Hansen et al. (1997). These recipes can be divided into materials that simulate 50% and 100% degraded waste by weight. The percent degradation indicates the anticipated amount of iron corrosion, as well as the decomposition of cellulosics, plastics, and rubbers (CPR). Axial, lateral, and volumetric strain and axial, lateral, and pore stress measurements were made. Two unique testing techniques were developed during the course of the experimental program. The first involves the use of dilatometry to measure sample volumetric strain under a hydrostatic condition. Bulk moduli of the samples measured using this technique were consistent with those measured using more conventional methods. The second technique involved performing triaxial tests under lateral strain control. By limiting the lateral strain to zero by controlling the applied confining pressure while loading the specimen axially in compression, one can maintain a right-circular cylindrical geometry even under large deformations. This technique is preferred over standard triaxial testing methods which result in inhomogeneous deformation or (3z(Bbarreling(3y. (BManifestations of the inhomogeneous deformation included non-uniform stress states, as well as unrealistic Poissons ratios (> 0.5) or those that vary significantly along the length of the specimen. Zero lateral strain controlled tests yield a more uniform stress state, and admissible and uniform values of Poissons ratio.

  16. WASTE ISOLATION PILOT PLANT (WIPP): THE NATIONS' SOLUTION TO NUCLEAR WASTE STORAGE AND DISPOSAL ISSUES

    SciTech Connect (OSTI)

    Lopez, Tammy Ann

    2014-07-17

    In the southeastern portion of my home state of New Mexico lies the Chihuahauan desert, where a transuranic (TRU), underground disposal site known as the Waste Isolation Pilot Plant (WIPP) occupies 16 square miles. Full operation status began in March 1999, the year I graduated from Los Alamos High School, in Los Alamos, NM, the birthplace of the atomic bomb and one of the nation’s main TRU waste generator sites. During the time of its development and until recently, I did not have a full grasp on the role Los Alamos was playing in regards to WIPP. WIPP is used to store and dispose of TRU waste that has been generated since the 1940s because of nuclear weapons research and testing operations that have occurred in Los Alamos, NM and at other sites throughout the United States (U.S.). TRU waste consists of items that are contaminated with artificial, man-made radioactive elements that have atomic numbers greater than uranium, or are trans-uranic, on the periodic table of elements and it has longevity characteristics that may be hazardous to human health and the environment. Therefore, WIPP has underground rooms that have been carved out of 2,000 square foot thick salt formations approximately 2,150 feet underground so that the TRU waste can be isolated and disposed of. WIPP has operated safely and successfully until this year, when two unrelated events occurred in February 2014. With these events, the safety precautions and measures that have been operating at WIPP for the last 15 years are being revised and improved to ensure that other such events do not occur again.

  17. DOE to host workshop to explore use of WIPP as 'next generation' underground laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Workshop to Explore Use of WIPP As 'Next Generation' Underground Laboratory CARLSBAD, N.M., June 9, 2000 - The U.S. Department of Energy's (DOE) Carlsbad Area Office is sponsoring the "Workshop on the Next Generation U.S. Underground Science Facility" June 12-14 at the Pecos River Village Conference Center, 711 Muscatel, in Carlsbad. The purpose of the workshop is to explore the potential use of the DOE's Waste Isolation Pilot Plant (WIPP) underground as a next generation laboratory

  18. Microsoft Word - DisposalInSaltDifferentThanDisposalInWIPP.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Issues Statement Concerning Debates Over Waste Disposal in Salt CARLSBAD, N.M., July 24, 2009 - The U.S. Department of Energy and its Carlsbad Field Office recognize and respect the long history that led to the current regulations that govern operations at the Waste Isolation Pilot Plant (WIPP). The WIPP is authorized to ship and dispose of transuranic (TRU) waste that was created by U.S. defense programs. TRU waste is a category of waste strictly defined by legislation and legal agreements.

  19. sent to the WIPP Laboratories, Los Alamos National Laboratory, and Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 2014 Samples sent to national laboratories for analysis Samples collected by employees during last week's re-entry into the WIPP underground facility will be sent to the WIPP Laboratories, Los Alamos National Laboratory, and Savannah River National Laboratory for insight into what may have caused the February 14 radiological event. Re-entry teams collected swipe samples in Room 7 of Panel 7. Workers also collected a filter from a fixed air sampler at the entrance of Room 1 in Panel 7 and the

  20. The Nevada Test Site Legacy TRU Waste - The WIPP Central Characterization Project

    SciTech Connect (OSTI)

    Norton, J. F.; Lahoud, R. G.; Foster, B. D.; VanMeighem, J.

    2003-02-25

    This paper discusses the Central Characterization Project (CCP) designed by the Waste Isolation Pilot Plant (WIPP) to aid sites, especially those sites with small quantities of transuranic (TRU) waste streams, in disposing of legacy waste at their facility. Because of the high cost of contracting vendors with the characterization capabilities necessary to meet the WIPP Waste Acceptance Criteria, utilizing the CCP is meant to simplify the process for small quantity sites. The paper will describe the process of mobilization of the vendors through CCP, the current production milestones that have been met, and the on-site lessons learned.

  1. Microsoft Word - DOE-WIPP-02-3122-REV8.0-FINAL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP-02-3122 TRANSURANIC WASTE ACCEPTANCE CRITERIA FOR THE WASTE ISOLATION PILOT PLANT Revision 8.0 Effective Date: July 5, 2016 This document supersedes DOE/WIPP 02-3122, Rev. 7.4 U.S. Department of Energy Carlsbad Field Office 2 This document has been submitted as required to: Office of Scientific and Technical Information U.S. Department of Energy PO Box 62 Oak Ridge, TN 37831 (865) 576-8401 Additional information about this document may be obtained by calling 1-800-336-9477. Unlimited,

  2. DOE Honors WIPP Representative for Cutting Travel Costs, Greenhouse Gas Emissions

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – A representative of the Waste Isolation Pilot Plant (WIPP) near Carlsbad, N.M., on Tuesday received the Secretary of Energy’s Appreciation Award for her efforts to improve sustainability and reduce travel costs and the number of fleet vehicles.

  3. CBFO and WIPP Volunteerism Makes a Big Difference This Winter for Little Ones

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – November’s winter chill started early in New Mexico. However, children in the Carlsbad, New Mexico area should be able to keep warm while outdoors thanks in part to the actions of the EM Carlsbad Field Office (CBFO) and Waste Isolation Pilot Plant (WIPP) team of employees.

  4. 2011-02 "Accelerating TRU Waste Shipments from Area G to WIPP" | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 2 "Accelerating TRU Waste Shipments from Area G to WIPP" 2011-02 "Accelerating TRU Waste Shipments from Area G to WIPP" The intent of this recommendation is to help ensure that the rate of removal of Transuranic Waste from Area G is consistent with the completion of milestones in the 2005 Order on Consent. It is hoped that all agencies can work together and that all available funds can be used for WIPP shipments rather than some monies being diverted to pay

  5. Shipment and Disposal of Solidified Organic Waste (Waste Type IV) to the Waste Isolation Pilot Plant (WIPP)

    SciTech Connect (OSTI)

    D'Amico, E. L; Edmiston, D. R.; O'Leary, G. A.; Rivera, M. A.; Steward, D. M.

    2006-07-01

    In April of 2005, the last shipment of transuranic (TRU) waste from the Rocky Flats Environmental Technology Site to the WIPP was completed. With the completion of this shipment, all transuranic waste generated and stored at Rocky Flats was successfully removed from the site and shipped to and disposed of at the WIPP. Some of the last waste to be shipped and disposed of at the WIPP was waste consisting of solidified organic liquids that is identified as Waste Type IV in the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC) document. Waste Type IV waste typically has a composition, and associated characteristics, that make it significantly more difficult to ship and dispose of than other Waste Types, especially with respect to gas generation. This paper provides an overview of the experience gained at Rocky Flats for management, transportation and disposal of Type IV waste at WIPP, particularly with respect to gas generation testing. (authors)

  6. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th from 7:00 am to 7:00 pm (PST). During this time staff will upgrade the Genepool compute nodes to Debian 6. Also, the firmware for /projectb and /house will be updated. /projectb will be unavailable from 7:00 am to 7:00 pm (PST) and /house will be unavailable from 8:00 am to 1:00 pm (PST). Any webservices or workflows

  7. Certifying the Waste Isolation Pilot Plant: Lessons Learned from the WIPP Experience

    SciTech Connect (OSTI)

    Anderson, D.R.; Chu, Margaret S.Y.; Froehlich, Gary K.; Howard, Bryan A.; Howarth, Susan M.; Larson, Kurt W.; Pickering, Susan Y.; Swift, Peter N.

    1999-07-13

    In May 1998, the US Environmental Protection Agency (EPA) certified the US Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) as being in compliance with applicable long-term regulations governing the permanent disposal of spent nuclear fuel, high-level, and transuranic radioactive wastes. The WIPP is the first deep geologic repository in the US to have successfully demonstrated regulatory compliance with long-term radioactive waste disposal requirements. The first disposal of TRU waste at WIPP occurred on March 26, 1999. Many of the lessons learned during the WIPP Project's transition from site characterization and experimental research to the preparation of a successful application may be of general interest to other repository programs. During a four-year period (1992 to 1996), the WIPP team [including the DOE Carlsbad Area Office (CAO), the science advisor to CAO, Sandia National Laboratories (SNL), and the management and operating contractor of the WIPP site, Westinghouse Electric Corporation (WID)] met its aggressive schedule for submitting the application without compromising the integrity of the scientific basis for the long-term safety of the repository. Strong leadership of the CAO-SNL-WID team was essential. Within SNL, a mature and robust performance assessment (PA) allowed prioritization of remaining scientific activities with respect to their impact on regulatory compliance. Early and frequent dialog with EPA staff expedited the review process after the application was submitted. Questions that faced SNL are familiar to geoscientists working in site evaluation projects. What data should be gathered during site characterization? How can we know when data are sufficient? How can we know when our understanding of the disposal system is sufficient to support our conceptual models? What constitutes adequate ''validation'' of conceptual models for processes that act over geologic time? How should we use peer review and expert judgment? Other

  8. Analysis report for WIPP colloid model constraints and performance assessment parameters

    SciTech Connect (OSTI)

    Mariner, Paul E.; Sassani, David Carl

    2014-03-01

    An analysis of the Waste Isolation Pilot Plant (WIPP) colloid model constraints and parameter values was performed. The focus of this work was primarily on intrinsic colloids, mineral fragment colloids, and humic substance colloids, with a lesser focus on microbial colloids. Comments by the US Environmental Protection Agency (EPA) concerning intrinsic Th(IV) colloids and Mg-Cl-OH mineral fragment colloids were addressed in detail, assumptions and data used to constrain colloid model calculations were evaluated, and inconsistencies between data and model parameter values were identified. This work resulted in a list of specific conclusions regarding model integrity, model conservatism, and opportunities for improvement related to each of the four colloid types included in the WIPP performance assessment.

  9. Maintenance | OpenEI Community

    Open Energy Info (EERE)

    Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

  10. DOE, State Officials Cut Ribbon for New WIPP Emergency Operations Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 7, 2016 DOE, State Officials Cut Ribbon for New WIPP Emergency Operations Center New Mexico Governor Susana Martinez joined U.S. Department of Energy (DOE) officials for a ribbon cutting ceremony to mark the completion of a new state-of-the- art Emergency Operations Center (EOC) located in Carlsbad, NM. "We're pleased to share this accomplishment with Governor Martinez and other state and community leaders," said Mark Whitney, DOE's Principal Deputy Assistant Secretary for

  11. Microsoft Word - 2014 3-19 FINAL WIPP News Release - WCS Shipments Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact: Donavan Mager, Manager NWP Communication (575) 234-7586 www.nwp-wipp.com DOE, NWP Making Plans to Continue Moving LANL Transuranic Waste Proposal Would Assist DOE in Meeting Commitment to New Mexico CARLSBAD, N.M., March 20, 2014 - Nuclear Waste Partnership (NWP), the management and operating contractor at the Waste Isolation Pilot Plant, in coordination with the U.S. Department of Energy (DOE), is proposing to ship transuranic waste currently located at the Los Alamos National

  12. Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples

    Office of Environmental Management (EM)

    by the Savannah River National Laboratory (SRNL) | Department of Energy Underground and MgO Samples by the Savannah River National Laboratory (SRNL) Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL) This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. The Technical

  13. GAS-GENERATION EXPERIMENTS FOR LONG-TERM STORAGE OF TRU WASTES AT WIPP

    SciTech Connect (OSTI)

    Felicione, F.S.; Carney, K.P.; Dwight, C.C.; Cummings, D.G.; Foulkrod, L.E.

    2003-02-27

    An experimental investigation was conducted for gas generation in contact-handled transuranic (CH-TRU) wastes subjected for several years to conditions similar to those expected to occur at the Waste Isolation Pilot Plant (WIPP) should the repository eventually become inundated with brine. Various types of actual CH-TRU wastes were placed into 12 corrosion-resistant vessels. The vessels were loosely filled with the wastes, which were submerged in synthetic brine having the same chemical composition as that in the WIPP vicinity. The vessels were also inoculated with microbes found in the Salado Formation at WIPP. The vessels were sealed, purged, and the approximately 750-ml headspace was pressurized with nitrogen gas to approximately 146 atmospheres to create anoxic conditions at the lithostatic pressure expected in the repository were it inundated. The temperature was maintained at the expected 30 C. The test program objective was to measure the quantities and species of gases generate d by metal corrosion, radiolysis, and microbial activity. These data will assist in the specification of the rates at which gases are produced under inundated repository conditions for use in the WIPP Performance Assessment computer models. These experiments were very carefully designed, constructed, instrumented, and performed. Approximately 6-1/2 years of continuous, undisturbed testing were accumulated. Several of the vessels showed significantly elevated levels of generated gases, virtually all of which was hydrogen. One vessel measured over 4.2% hydrogen, by volume. Two other vessels generated well over 1% hydrogen, and another was at nearly 1%. Only small quantities of other gases, principally carbon dioxide, were detected. Gas generation was found to depend strongly on the waste composition. The maximum hydrogen generation occurred in tests containing carbon steel. Average corrosion penetration rates in carbon-steel of up to 2.3 microns per year were deduced. Conversion of

  14. Microsoft Word - WIPP Rad Event Report Phase 2 04.16.2015.docx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Phase 2 Radiological Release Event at the Waste Isolation Pilot Plant, February 14, 2014 April 2015 Radiological Release Event at the Waste Isolation Pilot Plant Radiological Release Event at the Waste Isolation Pilot Plant Disclaimer On February 14, 2014, an airborne radiological release occurred at the Department of Energy Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. On March 4, 2014, an Accident Investigation Board (the Board) was appointed by Matthew Moury, Deputy Assistant

  15. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  16. Correlation of drillhole and shaft logs. Waste Isolation Pilot Plant (WIPP) project, southeastern New Mexico

    SciTech Connect (OSTI)

    Jarolimek, L.; Timmer, M.J.; Powers, D.W.

    1983-03-01

    This report on stratigraphic correlations from drillhole and shaft data along a generally north-south section across the potential extent of underground excavations of the Waste Isolation Pilot Plant (WIPP) facility was prepared as part of the Site Validation Field Program Plan. The results provide (1) input for the report entitled ''Results of Site Validation Experiments,'' (2) input for other WIPP-related investigations, including the Design Validation Program, and (3) a framework for further underground activities at WIPP. In general, this correlation study confirmed previous findings, including: relatively high consistency of thickness and lateral continuity of all beds within the Salado Formation, especially in the host rock interval; gentle, generally south and southeastward dips/slopes of the host rock interval strata; close correspondence between stratigraphic data obtained from the present underground excavations and data derived from the previous investigative drillholes and shafts; and depositional origin of the undulations on the top of Marker Bed (MB) 139 and relatively small variation in its thickness (1.2 to 4.1 feet).

  17. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 4, Revision 1.0

    SciTech Connect (OSTI)

    Not Available

    1991-12-31

    The US Department of Energy is currently constructing the Waste Isolation Pilot near Carlsbad, New Mexico. The full-scale pilot plant will demonstrate the feasibility of the safe disposal of defense-related nuclear waste in a bedded salt formation at a depth of 2160 feet below the surface. WIPP will provide for the permanent storage of 25,000 cu ft of remote-handled (RH) transuranic waste and 6,000,000 cu ft of contact-handled (CH) transuranic waste. This paper covers the major mechanical/structural design considerations for the waste hoist and its hoist tower structure. The design of the hoist system and safety features incorporates state-of-the-art technology developed in the hoist and mining industry to ensure safe operation for transporting nuclear waste underground. Also included are design specifications for VOC-10 monitoring system.

  18. Step 5: Operations and Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process Step 5: Project Operations and Maintenance Project Development Process 1 Potential 5 Operations & Maintenance 3 Refinement 2 Options 4 Implementation 2 1/28/2016 2 Presentation Agenda * Step 5: Project Operations and Maintenance (O&M) * Post-procurement activities * Drivers * Technology examples * Activity 3 Potential Options Refinement Implementation Operations & Maintenance Step 5: Operations & Maintenance 4 Photo by Warren Getz, NREL 00180 Purpose: Conduct or ensure

  19. The WIPP RCRA Part B permit application for TRU mixed waste disposal

    SciTech Connect (OSTI)

    Johnson, J.E. [Westinghouse Electric Corp., Carlsbad, NM (United States). Waste Isolation Div.; Snider, C.A. [USDOE Carlsbad Area Office, NM (United States)

    1995-12-31

    In August 1993, the New Mexico Environment Department (NMED) issued a draft permit for the Waste Isolation Pilot Plant (WIPP) to begin experiments with transuranic (TRU) mixed waste. Subsequently, the Department of Energy (DOE) decided to cancel the on-site test program, opting instead for laboratory testing. The Secretary of the NMED withdrew the draft permit in 1994, ordering the State`s Hazardous and Radioactive Waste Bureau to work with the DOE on submittal of a revised permit application. Revision 5 of the WIPP`s Resource Conservation and Recovery Act (RCRA) Part B Permit Application was submitted to the NMED in May 1995, focusing on disposal of 175,600 m{sup 3} of TRU mixed waste over a 25 year span plus ten years for closure. A key portion of the application, the Waste Analysis Plan, shifted from requirements to characterize a relatively small volume of TRU mixed waste for on-site experiments, to describing a complete program that would apply to all DOE TRU waste generating facilities and meet the appropriate RCRA regulations. Waste characterization will be conducted on a waste stream basis, fitting into three broad categories: (1) homogeneous solids, (2) soil/gravel, and (3) debris wastes. Techniques used include radiography, visually examining waste from opened containers, radioassay, headspace gas sampling, physical sampling and analysis of homogeneous wastes, and review of documented acceptable knowledge. Acceptable knowledge of the original organics and metals used, and the operations that generated these waste streams is sufficient in most cases to determine if the waste has toxicity characteristics, hazardous constituents, polychlorinated biphenyls (PBCs), or RCRA regulated metals.

  20. Review of the WIPP draft application to show compliance with EPA transuranic waste disposal standards

    SciTech Connect (OSTI)

    Neill, R.H.; Chaturvedi, L.; Clemo, T.M.

    1996-03-01

    The purpose of the New Mexico Environmental Evaluation Group (EEG) is to conduct an independent technical evaluation of the Waste Isolation Pilot Plant (WIPP) Project to ensure the protection of the public health and safety and the environment. The WIPP Project, located in southeastern New Mexico, is being constructed as a repository for the disposal of transuranic (TRU) radioactive wastes generated by the national defense programs. The EEG was established in 1978 with funds provided by the U.S. Department of Energy (DOE) to the State of New Mexico. Public Law 100-456, the National Defense Authorization Act, Fiscal Year 1989, Section 1433, assigned EEG to the New Mexico Institute of Mining and Technology and continued the original contract DE-AC04-79AL10752 through DOE contract DE-AC04-89AL58309. The National Defense Authorization Act for Fiscal Year 1994, Public Law 103-160, continues the authorization. EEG performs independent technical analyses of the suitability of the proposed site; the design of the repository, its planned operation, and its long-term integrity; suitability and safety of the transportation systems; suitability of the Waste Acceptance Criteria and the generator sites` compliance with them; and related subjects. These analyses include assessments of reports issued by the DOE and its contractors, other federal agencies and organizations, as they relate to the potential health, safety and environmental impacts from WIPP. Another important function of EEG is the independent environmental monitoring of background radioactivity in air, water, and soil, both on-site and off-site.

  1. Evaluation of the WIPP Project`s compliance with the EPA radiation protection standards for disposal of transuranic waste

    SciTech Connect (OSTI)

    Neill, R.H.; Chaturvedi, L.; Rucker, D.F.; Silva, M.K.; Walker, B.A.; Channell, J.K.; Clemo, T.M. |

    1998-03-01

    The US Environmental Protection Agency`s (EPA) proposed rule to certify that the Waste Isolation Pilot Plant (WIPP) meets compliance with the long-term radiation protection standards for geologic repositories (40CFR191 Subparts B and C), is one of the most significant milestones to date for the WIPP project in particular, and for the nuclear waste issue in general. The Environmental Evaluation Group (EEG) has provided an independent technical oversight for the WIPP project since 1978, and is responsible for many improvements in the location, design, and testing of various aspects of the project, including participation in the development of the EPA standards since the early 1980s. The EEG reviewed the development of documentation for assessing the WIPP`s compliance by the Sandia National Laboratories following the 1985 promulgation by EPA, and provided many written and verbal comments on various aspects of this effort, culminating in the overall review of the 1992 performance assessment. For the US Department of Energy`s (DOE) compliance certification application (CCA), the EEG provided detailed comments on the draft CCA in March, 1996, and additional comments through unpublished letters in 1997 (included as Appendices 8.1 and 8.2 in this report). Since the October 30, 1997, publication of the EPA`s proposed rule to certify WIPP, the EEG gave presentations on important issues to the EPA on December 10, 1997, and sent a December 31, 1997 letter with attachments to clarify those issues (Appendix 8.3). The EEG has raised a number of questions that may have an impact on compliance. In spite of the best efforts by the EEG, the EPA reaction to reviews and suggestions has been slow and apparently driven by legal considerations. This report discusses in detail the questions that have been raised about containment requirements. Also discussed are assurance requirements, groundwater protection, individual protection, and an evaluation of EPA`s responses to EEG`s comments.

  2. DE-EM-0001971 WIPP M&O H-i PART I -THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP M&O H-i PART I -THE SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS Table of Content H.1 REPRESENTATIONS AND CERTIFICATIONS 1 H.2 MODIFICATION AUTHORITY 1 H.3 NO THIRD PARTY BENEFICIARIES 1 H.4 WORKFORCE TRANSITION 1 H.5 EMPLOYEE COMPENSATION: PAY AND BENEFITS 2 H.6 WORKFORCE TRANSITION AND BENEFITS TRANSITION: PLANS AND TIMEFRAMES 12 H.7 POST-CONTRACT RESPONSIBILITIES FOR PENSION AND OTHER BENEFIT PLANS 16 H.8 TRANSITION ACTIVITIES 17 H.9 KEY PERSONNEL 18 H.10 TECHNICAL DIRECTION -

  3. Microsoft Word - 2015-05-08_SRNL Enviro Sci and Biotechn Support of WIPP

    Office of Environmental Management (EM)

    SRNL-TR-20015-00121 Date: May 8, 2015 From: Robin L. Brigmon 999-W (819-8405/19384) Charles E. Milliken 999-W (803) 819-8426 John J. Mayer 773-42A (803) 725-5991 To: David Hobbs 773-A Sheryl Bush 773-42A Subject: SRNL Environmental Sciences and Biotechnology Support of WIPP (R.L. Brigmon and C. E. Milliken) The Environmental Sciences and Biotechnology (ESB) group was consulted concerning the potential for biological activity, e.g., microbial heating and gas production, contributing to the Waste

  4. Carlsbad Area Office unveils full-scale model of new WIPP waste transportation cask

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlsbad Area Office Unveils Full-Scale Model Of New WIPP Waste Transportation Cask CARLSBAD, N.M., February 23, 2000 - The U.S. Department of Energy's (DOE) Carlsbad Area Office today unveiled a full-scale model of its newest waste transportation cask, the RH-72B, during a ceremony at the local DOE offices. "This is another milestone for the Department of Energy," said Dr. Inés Triay, Manager of the Carlsbad Area Office, describing the importance of the new container for those

  5. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 4, Chapter D, Appendix D1 (beginning), Revision 3

    SciTech Connect (OSTI)

    Lappin, A. R.

    1993-03-01

    The Waste Isolation Pilot Plant (WIPP), which is designed for receipt, handling, storage, and permanent isolation of defense-generated transuranic wastes, is being excavated at a depth of approximately 655 m in bedded halites of the Permian Salado Formation of southeastern New Mexico. Site-characterization activities at the present WIPP site began in 1976. Full construction of the facility began in 1983, after completion of ``Site and Preliminary Design Validation`` (SPDV) activities and reporting. Site-characterization activities since 1983 have had the objectives of updating or refining the overall conceptual model of the geologic, hydrologic, and structural behavior of the WIPP site and providing data adequate for use in WIPP performance assessment. This report has four main objectives: 1. Summarize the results of WIPP site-characterization studies carried out since the spring of 1983 as a result of specific agreements between the US Department of Energy and the State of New Mexico. 2. Summarize the results and status of site-characterization and facility-characterization studies carried out since 1983, but not specifically included in mandated agreements. 3. Compile the results of WIPP site-characterization studies into an internally consistent conceptual model for the geologic, hydrologic, geochemical, and structural behavior of the WIPP site. This model includes some consideration of the effects of the WIPP facility and shafts on the local characteristics of the Salado and Rustler Formations. 4. Discuss the present limitations and/or uncertainties in the conceptual geologic model of the WIPP site and facility. The objectives of this report are limited in scope, and do not include determination of whether or not the WIPP Project will comply with repository-performance criteria developed by the US Environmental Protection Agency (40CFR191).

  6. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 3, Model parameters: Sandia WIPP Project

    SciTech Connect (OSTI)

    Not Available

    1992-12-29

    This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter.

  7. TRU TeamWorks - a biweekly e-newsletter for the Waste Isolation Pilot Plant (WIPP) team

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TRU TeamWorks - a biweekly e-newsletter for the Waste Isolation Pilot Plant (WIPP) team July 28, 2005 Shipments scheduled to arrive 07/31/05 - 08/06/05 21 Hanford - 4 INL - 14 LANL - 2 SRS - 1 (subject to change) 3,783 total shipments received as of 07/26/05 file:///C|/Documents%20and%20Settings/antipom/Desktop/TeamWorks%20Website/index.htm (1 of 3)7/28/2005 8:17:59 AM TRU TeamWorks - a biweekly e-newsletter for the Waste Isolation Pilot Plant (WIPP) team Waste disposed as of 07/26/05 : 501

  8. OpenEI Community - Maintenance

    Open Energy Info (EERE)

    maintenance March 8-9, 2013 http:en.openei.orgcommunityblogopenei-maintenance-march-8-9-2013

    We would like to inform the OpenEI community that OpenEI will be...

  9. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern.

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2000-05-23

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  10. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as this water ...

  11. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday, ...

  12. Operations and Maintenance in Federal Facilities | Department...

    Office of Environmental Management (EM)

    Operations and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as ...

  13. Numerical simulation of ground-water flow in the Culebra dolomite at the Waste Isolation Pilot Plant (WIPP) site: Second interim report

    SciTech Connect (OSTI)

    LaVenue, A.M.; Haug, A.; Kelley, V.A.

    1988-03-01

    This hydrogeologic modeling study has been performed as part of the regional hydrologic characterization of the Waste Isolation Pilot Plant (WIPP) Site in southeastern New Mexico. The study resulted in an estimation of the transmissivity distrubution, hydraulic potentials, flow field, and fluid densities in the Culebra Dolomite Member of the Permian Rustler Formation at the WIPP site. The three-dimensional finite-difference code SWIFT-II was employed for the numerical modeling, using variable-fluid-density and a single-porosity formulation. The modeled area includes and extends beyond the WIPP controlled zone (Zone 3). The work performed consisted of modeling the hydrogeology of the Culebra using two approaches: (1) steady-state modeling to develop the best estimate of the undisturbed head distribution, i.e., of the situation before sinking if the WIPP shafts, which began in 1981; and (2) superimposed transient modeling of local hydrologic responses to excavation of the three WIPP shafts at the center of the WIPP site, as well as to various well tests. Boundary conditions (prescribed constant fluid pressures and densities) were estimated using hydraulic-head and fluid-density data obtained from about 40 wells at and near the WIPP site. The transient modeling used the calculated steady-state freshwater heads as initial conditions. 107 refs., 112 figs., 22 tabs.

  14. LANL Reaches Waste Shipment Milestone: Waste from Cold War-era weapons production being shipped to WIPP

    Broader source: Energy.gov [DOE]

    LOS ALAMOS, New Mexico, May 31, 2011 — Los Alamos National Laboratory has reached an important milestone in its campaign to ship transuranic (TRU) waste from Cold War-era nuclear operations to the U.S. Department of Energy’s Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico.

  15. Hanford.gov Site Maintenance - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Email Email Page | Print Print Page | Text Increase Font Size ...

  16. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities ...

  17. Hanford Tank Waste to WIPP - Maximizing the Value of our National Repository Asset

    SciTech Connect (OSTI)

    Tedeschi, Allan R.; Wheeler, Martin

    2013-11-11

    Preplanning scope for the Hanford tank transuranic (TRU) waste project was authorized in 2013 by the Department of Energy (DOE) Office of River Protection (ORP) after a project standby period of eight years. Significant changes in DOE orders, Hanford contracts, and requirements at the Waste Isolation Pilot Plant (WIPP) have occurred during this time period, in addition to newly implemented regulatory permitting, re-evaluated waste management strategies, and new commercial applications. Preplanning has identified the following key approaches for reactivating the project: qualification of tank inventory designations and completion of all environmental regulatory permitting; identifying program options to accelerate retrieval of key leaking tank T-111; planning fully compliant implementation of DOE Order 413.3B, and DOE Standard 1189 for potential on-site treatment; and re-evaluation of commercial retrieval and treatment technologies for better strategic bundling of permanent waste disposal options.

  18. Plutonium chemistry under conditions relevant for WIPP performance assessment. Review of experimental results and recommendations for future work

    SciTech Connect (OSTI)

    Oversby, Virginia M.

    2000-09-30

    The Waste Isolation Pilot Plant (WIPP), located at a depth of 650 m in bedded salt at a site approximately 40 km east of Carlsbad, New Mexico, was constructed by the US Department of Energy for the disposal of transuranic wastes arising from defense-related activities. The disposal site is regulated by the US Environmental Protection Agency (EPA). During the process leading to certification of the site for initial emplacement of waste, EEG and their contractors reviewed the DOE Compliance Certification Application (CCA) and raised a number of issues. This report reviews the issues related to the chemistry of plutonium as it will affect the potential for release of radioactivity under WIPP conditions. Emphasis is placed on conditions appropriate for the Human Intrusion scenario(s), since human intrusion has the largest potential for releasing radioactivity to the environment under WIPP conditions. The most significant issues that need to be addressed in relation to plutonium chemistry under WIPP conditions are (1) the effects of heterogeneity in the repository on Pu concentrations in brines introduced under the human intrusion scenario, (2) the redox state of Pu in solution and potential for plutonium in solid phases to have a different redox state from that in the solution phase, (3) the effect of organic ligands on the solubility of Pu in WIPP-relevant brines, and (4) the effects of TRU waste characteristics in determining the solubility of Pu. These issues are reviewed with respect to the treatment they received in the DOE CCA, DOEs response to EEGs comments on the CCA, and EPAs response to those comments as reflected in the final EPA rule that led to the opening of the WIPP. Experimental results obtained in DOEs Actinide Source-Term Test Program (STTP) during the last two years are reviewed and interpreted in the light of other developments in the field of Pu solution chemistry. This analysis is used as the basis for a conceptual model for Pu behavior under

  19. Preoperational radiation surveillance of the WIPP project by EEG during 1992

    SciTech Connect (OSTI)

    Kenney, J.W.

    1994-02-01

    The purpose of the EEG preoperational monitoring program is to document the existing concentrations of selected radionuclides in various environmental media collected from the vicinity of the WIPP site to provide a basis of comparison of any effects of future WT-PP operations. The basic methodology for conducting environmental surveillance both on-site and off-site was outlined by Spiegler (1984). This report represents a continuation of the EEG baseline data beginning in 1985, previously reported in EEG-43, EEG-47, EEG-49 and EEG-51. Such radionuclide baseline data are important in order to determine whether future WIPP operations with radioactive waste have affected concentrations of these radionuclides in the environment. EEG data are consistent with similar environmental measurements obtained by DOE beginning in 1985. Since late 1985, the EEG has collected or received as split samples 2 443 air filters with particulates, 202 water samples, 16 biota samples and 13 soil/sediment samples. A total of 5,946 specific radionuclide analyses have been performed on these samples. As reported previously by EEG (EEG-43, EEG-47, EEG-49 and EEG-51), observed concentrations of U-238 daughter radionuclides were not in equilibrium with the parent radionuclide in water samples. This observation is consistent with different radionuclide mobility in the environment. In a notice of proposed rule making for 40 CFR 141 (US EPA 1991), the Environmental Protection Agency (EPA) National Primary Drinking Water Regulations reflect this in the calculated activity-to-mass ratio of 1.3 pCi/{mu}g of uranium using a geometric mean of the U-234:U-238 ratio in water supplies of 2.7. Ra-226 and Ra- 228 were reported in a number of water samples in concentrations similar to those previously published by EEG and DOE.

  20. Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness

    SciTech Connect (OSTI)

    Vesely, W.E.; Rezos, J.T.

    1995-09-01

    This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

  1. Resource Conservation and Recovery Act: Part B, Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revison 1.0

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements.

  2. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Chapter D, Appendix D1 (conclusion): Volume 3, Revision 1.0

    SciTech Connect (OSTI)

    Not Available

    1992-06-01

    This report, Part B (Vol. 3) of the permit application for the WIPP facility, contains information related to the site characterization of the facility, including geology, design, rock salt evaluations, maps, drawings, and shaft excavations. (CBS)

  3. Resource Conservation and Recovery Act Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 7: Revision 1.0

    SciTech Connect (OSTI)

    Not Available

    1992-07-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards.

  4. Test Site Operations & Maintenance Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Site Operations & Maintenance Safety - Sandia Energy Energy Search Icon Sandia Home ... Applications National Solar Thermal Test Facility Nuclear Energy Systems ...

  5. Upcoming BPAT Systems Maintenance Events

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming-BPAT-Systems-Maintenance-Events Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer...

  6. US Department of Energy - Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Howdy fellow energy adventurer Energy.gov is currently undergoing routine maintenance that will make it even more awesome. Please try again in a few minutes. We...

  7. Tim Kuneli, Electronics Maintenance Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tim Kuneli, Electronics Maintenance Group Print The recent ALS power supply failure was one of the most challenging projects that Electronics Engineer Technical Superintendent Tim...

  8. Operational Experience with an Imaging Passive/Active Neutron System (IPAN{sup TM}) in a Mature Production Application to Perform WIPP Certified Non-destructive Assays

    SciTech Connect (OSTI)

    Simpson, A.P.; West, J.M.; Carlton, T.; Peterson, T.; Harvill, J.

    2006-07-01

    BIL Solutions Inc. have deployed and operated an Imaging Passive/Active Neutron System (IPANTM) System at the Savannah River Site (SRS) in South Carolina for the purpose of performing non-destructive assays on contact handled transuranic (CH-TRU) waste in 55-gallon containers. During the four-plus years of operation (May 2001 through August 2005), a vast amount of experience has been gained, with approximately 8950 waste containers assayed. This experience has provided the knowledge base for the evolution of improvements in the assay technique and instrument maintenance and troubleshooting. Additionally, operational experience provides for very reliable characterization of the robustness and applicability of this assay technique for a wide variety of waste streams and provides for assessment of the achievable production output capabilities over a long period of time in a production environment. The assay technique combines passive/active neutron data with gamma energy analysis (GEA) data and acceptable knowledge (AK) data to provide Waste Isolation Pilot Plant (WIPP) compliant quantification of the required nuclides within the waste. These data are incorporated through system software, which automate the data analysis process. However, due to the complex nature of NDA and the potential for a wide variety of interferences, each analysis is reviewed by an Expert Analyst (EA). The software allows the EA to interact with the data analysis process to provide regulatory compliant and defensible results. This technique has evolved with time as a vast array of waste and isotopic compositions have been encountered During 1555 days from the beginning of production operations, the system maintenance log indicates 63 days of downtime due to hardware problems. This translates to an operational availability of 96%. Given the extensive length of time represented by this availability data, 96% availability would represent a very reliable estimate for future applications

  9. Enterprise Assessments Operational Awareness Record for the Review of the Technical Planning Basis at the Waste Isolation Pilot Plant (EA-WIPP-TPB-2016-04-05)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA Operational Awareness Record Report Number: EA-WIPP-TPB-2016-04-05 Site: Waste Isolation Pilot Plant Subject: Observation of Emergency Management Technical Planning Dates of Activity: 04/05/16 - 04/21/16 Report Preparer: Kurt Runge Activity Description/Purpose: The U.S. Department of Energy (DOE) Office of Emergency Management Assessments, within the independent Office of Enterprise Assessments (EA) reviewed portions of the technical planning basis for the Waste Isolation Pilot Plant (WIPP)

  10. Fluid injection for salt water disposal and enhanced oil recovery as a potential problem for the WIPP: Proceedings of a June 1995 workshop and analysis

    SciTech Connect (OSTI)

    Silva, M.K.

    1996-08-01

    The Waste Isolation Pilot Plant (WIPP) is a facility of the U.S. Department of Energy (DOE), designed and constructed for the permanent disposal of transuranic (TRU) defense waste. The repository is sited in the New Mexico portion of the Delaware Basin, at a depth of 655 meters, in the salt beds of the Salado Formation. The WIPP is surrounded by reserves and production of potash, crude oil and natural gas. In selecting a repository site, concerns about extensive oil field development eliminated the Mescalero Plains site in Chaves County and concerns about future waterflooding in nearby oil fields helped eliminate the Alternate II site in Lea County. Ultimately, the Los Medanos site in Eddy County was selected, relying in part on the conclusion that there were no oil reserves at the site. For oil field operations, the problem of water migrating from the injection zone, through other formations such as the Salado, and onto adjacent property has long been recognized. In 1980, the DOE intended to prohibit secondary recovery by waterflooding in one mile buffer surrounding the WIPP Site. However, the DOE relinquished the right to restrict waterflooding based on a natural resources report which maintained that there was a minimal amount of crude oil likely to exist at the WIPP site, hence waterflooding adjacent to the WIPP would be unlikely. This document presents the workshop presentations and analyses for the fluid injection for salt water disposal and enhanced oil recovery utilizing fluid injection and their potential effects on the WIPP facility.

  11. DE-EM-0001971 WIPP M&O J-15 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS SECTION J ATTACHMENT D: SPECIAL FINANCIAL INSTITUTION ACCOUNT AGREEMENT FOR USE WITH THE PAYMENTS CLEARED FINANCING ARRANGEMENT DE-EM-0001971 WIPP M&O J-16 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS SECTION J ATTACHMENT D SPECIAL FINANCIAL INSTITUTION ACCOUNT AGREEMENT FOR USE WITH THE PAYMENTS CLEARED FINANCING ARRANGEMENT Agreement entered into this, _______ day of ___________, ________, between the UNITED

  12. DE-EM-0001971 WIPP M&O J-8 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS SECTION J ATTACHMENT C: DRAFT PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) DE-EM-0001971 WIPP M&O J-9 Draft PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) OCTOBER 1 (2012) through SEPTEMBER 30, (2013) Contract No. DE- EM0001971 SECTION J ATTACHMENT C I. INTRODUCTION This Performance Evaluation and Measurement Plan (PEMP) provides a standard process for development, administration, and coordination of all phases of the

  13. DE-SOL-0002555 WIPP Solicitation J-23 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS SECTION J ATTACHMENT F: GUIDANCE FOR PREPARATION OF DIVERSITY PLAN DE-SOL-0002555 WIPP Solicitation J-24 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS SECTION J ATTACHMENT F GUIDANCE FOR PREPARATION OF DIVERSITY PLAN (See Contract Clause entitled "Diversity Plan") This Guidance is to assist the Contractor in understanding the information being sought by the Department for each of the Diversity elements and

  14. DISPOSAL OF TRU WASTE FROM THE PLUTONIUM FINISHING PLANT IN PIPE OVERPACK CONTAINERS TO WIPP INCLUDING NEW SECURITY REQUIREMENTS

    SciTech Connect (OSTI)

    Hopkins, A.M.; Sutter, C.; Hulse, G.; Teal, J.

    2003-02-27

    The Department of Energy is responsible for the safe management and cleanup of the DOE complex. As part of the cleanup and closure of the Plutonium Finishing Plant (PFP) located on the Hanford site, the nuclear material inventory was reviewed to determine the appropriate disposition path. Based on the nuclear material characteristics, the material was designated for stabilization and packaging for long term storage and transfer to the Savannah River Site or, a decision for discard was made. The discarded material was designated as waste material and slated for disposal to the Waste Isolation Pilot Plant (WIPP). Prior to preparing any residue wastes for disposal at the WIPP, several major activities need to be completed. As detailed a processing history as possible of the material including origin of the waste must be researched and documented. A technical basis for termination of safeguards on the material must be prepared and approved. Utilizing process knowledge and processing history, the material must be characterized, sampling requirements determined, acceptable knowledge package and waste designation completed prior to disposal. All of these activities involve several organizations including the contractor, DOE, state representatives and other regulators such as EPA. At PFP, a process has been developed for meeting the many, varied requirements and successfully used to prepare several residue waste streams including Rocky Flats incinerator ash, Hanford incinerator ash and Sand, Slag and Crucible (SS&C) material for disposal. These waste residues are packed into Pipe Overpack Containers for shipment to the WIPP.

  15. Basic Data Report for Drillholes on the H-19 Hydropad (Waste Isolation Pilot Plant--WIPP)

    SciTech Connect (OSTI)

    Mercer, J.W.; Cole, D.L.; Holt, R.M.

    1998-10-09

    Seven holes were drilled and wells (H-19b0, H-19b2, H-19b3, H-19b4, H-19b5, H-19b6, and H-19b7) were constructed on the H-19 hydropad to conduct field activities in support of the Culebra Transport Program. These wells were drilled and completed on the Waste Isolation Pilot Plant (WIPP) site during February to September 1995. An eighth hole, H-19b1, was drilled but had to be abandoned before the target depth was reached because of adverse hole conditions. The geologic units penetrated at the H-19 location include surficial deposits of Holocene age, rocks from the Dockum Group of Upper Triassic age, the Dewey Lake Redbeds, and Rustler Formation of the Permian age. The Rustler Formation has been further divided into five informal members which include the Forty-niner Member, Magenta Member, Tamarisk Member, Culebra Dolomite Member, and an unnamed lower member. The Rustler Formation, particularly the Culebra Dolomite Member, is considered critical for hydrologic site characterization. The Culebra is the most transmissive saturated unit above the WIPP repository and, as such, is considered to be the most likely pathway for radionuclide transport to the accessible environment in the unlikely event the repository is breached. Seven cores from the Culebra were recovered during drilling activities at the H-19 hydropad and detailed descriptions of these cores were made. On the basis of geologic descriptions, four hydrostratigraphic units were identified in the Culebra cores and were correlated with the mapping units from the WFP air intake shaft. The entire length of H-19b1 was cored and was described in detail. During coring of H-19b1, moisture was encountered in the upper part of the Dewey Lake Redbeds. A 41-ft-thick section of this core was selected for detailed description to qualify the geologic conditions related to perched water in the upper Dewey Lake. In addition to cuttings and core, a suite of geophysical logs run on the drillholes was used to identify and

  16. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-03-05

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  17. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-03-05

    his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to

  18. PROBABILITY OF FAILURE OF THE TRUDOCK CRANE SYSTEM AT THE WASTE ISOLATION PILOT PLANT (WIPP)

    SciTech Connect (OSTI)

    Greenfield, M.A.; Sargent, T.J.

    2000-05-01

    This probabilistic analysis of WIPP TRUDOCK crane failure is based on two sources of failure data. The source for operator errors is the report by Swain and Guttman, NUREG/CR-1278-F, August 1983. The source for crane cable hook breaks was initially made by WIPP/WID-96- 2196, Rev. O by using relatively old (1970s) U.S. Navy data (NUREG-0612). However, a helpful analysis by R.K. Deremer of PLG guided the authors to values that were more realistic and more conservative, with the recommendation that the crane cable/hook failure rate should be 2.5 x 10-6 per demand. This value was adopted and used. Based on these choices a mean failure rate of 9.70 x 10-3(1/yr) was calculated. However, a mean rate by itself does not reveal the level of confidence to be associated with this number. Guidance to making confidence calculations came from the report by Swain and Guttman, who stated that failure data could be described by lognormal distributions. This is in agreement with the widely use d reports (by DOE and others) NPRD-95 and NPRD-91, on failure data. The calculations of confidence levels showed that the mean failure rate of 9.70x 10-3(1/yr) corresponded to a percentile value of approximately 71; i.e. there is a 71% likelihood that the failure rate is less than 9.70x 10-3(1/yr). One also calculated that there is a 95% likelihood that the failure rate is less than 29.6x 10-3(1/yr). Or, as stated previously, there is a 71% likelihood that not more than one dropped load will occur in 103 years. Also, there is a 95% likelihood that not more than one dropped load will occur in approximately 34 years. It is the responsibility of DOE to select the confidence level at which it desires to operate.

  19. Maintenance Practices for LED Streetlights

    Office of Energy Efficiency and Renewable Energy (EERE)

    This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

  20. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  1. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in ...

  2. Spring Home Maintenance: Windows, Windows, Windows! | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Spring Home Maintenance: Windows, Windows, Windows Spring Home Maintenance: Windows, Windows, Windows April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air ...

  3. Requirements Based Surveillance and Maintenance Review Process...

    Energy Savers [EERE]

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and ...

  4. FAQS Reference Guide - Facility Maintenance Management | Department...

    Broader source: Energy.gov (indexed) [DOE]

    are developed to assist operators, maintenance personnel, and the technical staff in ... (STD)-1181-2014, Facility Maintenance Management Functional Area Qualification Standard. ...

  5. Preventive Maintenance Strategies for Compressed Air Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Suggested Actions * Establish a regular, well-organized maintenance program in accordance ... that all compressed air system maintenance needs are performed properly, on ...

  6. Efficiency Lighting & Maintenance Inc | Open Energy Information

    Open Energy Info (EERE)

    & Maintenance Inc Jump to: navigation, search Name: Efficiency Lighting & Maintenance Inc Address: 5a Del Mar Drive Place: Brookfield, Connecticut Zip: 06804 Region: Northeast - NY...

  7. Geothermal Data Development, Collection, and Maintenance | Open...

    Open Energy Info (EERE)

    Data Development, Collection, and Maintenance Jump to: navigation, search Geothermal ARRA Funded Projects for Geothermal Data Development, Collection, and Maintenance Loading...

  8. Maintenance Planner | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance Planner Department: Facilities Requisition Number: 1501075 Position Summary: This multi-trade Maintenance Planner position will enhance the Lab's Facilities Division...

  9. Oregon Department of Transportation - Maintenance and Operations...

    Open Energy Info (EERE)

    Maintenance and Operations Branch Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Department of Transportation - Maintenance and Operations...

  10. Web Maintenance Requirements | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Read more about EERE's expectations for website maintenance. Maintenance Schedule All Web ... Learn more about content analysis. Attend semi-annual Web Governance Team meetings. Twice ...

  11. Preoperational radiation surveillance of the WIPP Project by EEG for the years 1993 - 1995

    SciTech Connect (OSTI)

    Kenney, J.W.; Gray, D.H.; Ballard, S.C.

    1998-03-01

    Average {sup 241}Am, {sup 239+240}Pu and {sup 238}Pu concentrations measured in ambient air near the Waste Isolation Pilot Plant (WIPP) site during 1993, 1994 and 1995 are consistent with similar data reported by the U.S. Environmental Protection Agency (EPA) and Los Alamos National Laboratory (LANL) for Espanola, Pojoaque and Santa Fe, New Mexico. Through the use of replicate analyses of matrix blanks minimum detectable activity (MDA), minimum detectable concentration (MDC) and action levels (ACTL) were established for the Environmental Evaluation Group (EEG) measurement system. Using MDA data from fixed air sampler (FAS) filters and conservative assumptions applied in the National Council on Radiation Protection and Measurements (NCRP) Report 123 (NCRP 1996), it is shown that the EEG sampling and measurement methodology is capable of detecting effluent air emissions which would produce a dose that is approximately 1000 times below the 40 CFR 191 Subpart A limit of 2.5E{sup -4} Sv/y (25 mrem/y). A similar calculation using the NCRP worksheet with storm water effluent MDCs found the EEG measurement program capable of detecting actinide emissions which would result in a dose that is approximately 10 times below the dose limits in 40 CFR 191 Subpart A and 40 CFR 61 Subpart H.

  12. Geology of north-central Delaware basin, Eddy and Lea Counties, New Mexico: its hydrocarbon potential, focusing on 12 townships centered on WIPP site

    SciTech Connect (OSTI)

    Cheeseman, R.J.

    1986-03-01

    The Waste Isolation Pilot Plant (WIPP) site is located within the Carlsbad potash mining area, southeastern New Mexico, about 20 mi east of Carlsbad. Structurally, the WIPP site is located in the north-central part of the Delaware basin, which yields hydrocarbon production from the following: the Ordovician Ellenburger; the Pennsylvanian Morrow (gas), Atoka (oil and gas), and Strawn (reef oil) intervals; the Wolfcamp (gas) and Bone Spring (oil) formations of lowermost Permian; the Permian Yates (800-3500 ft deep), Queen, and Seven Rivers Formations; and the Delaware Mountain Group (4700-5200 ft deep). Structure contour maps demonstrate favorable Bone Spring conditions north of the WIPP site and the centrally located Delaware targets, as well as important Morrow development in the southern part. Five prospects are explored, and two are especially promising. Five anticlinal trends in this 12-township area bear field names as a result of production: Big Eddy, South Salt Lake, Cabin Lake, Los Medanos, and Sand Dunes. The Department of Energy's WIPP project is a planned repository for nuclear waste; despite centering on a deep dry hole, it occurs just northeast of productive Morrow formation. Whereas the successful tests seem concentrated on the structural highs, significant wells produce offtrend; the WIPP site lies in a syncline.

  13. Operations & Maintenance Best Practices Guide: Chapter 3

    Broader source: Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  14. Iron production maintenance effectiveness system

    SciTech Connect (OSTI)

    Augstman, J.J.

    1996-12-31

    In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

  15. Simultaneous Thermal Analysis of WIPP and LANL Waste Drum Samples: A Preliminary Report

    SciTech Connect (OSTI)

    Wayne, David M.

    2015-10-19

    On Friday, February 14, 2014, an incident in P7R7 of the WIPP underground repository released radioactive material into the environment. The direct cause of the event was a breached transuranic (TRU) waste container, subsequently identified as Drum 68660. Photographic and other evidence indicates that the breach of 68660 was caused by an exothermic event. Subsequent investigations (Britt, 2015; Clark and Funk, 2015; Wilson et al., 2015; Clark, 2015) indicate that the combination of nitrate salts, pH neutralizing chemicals, and organic-based adsorbent represented a potentially energetic mixture. The materials inside the breached steel drum consisted of remediated, 30- to 40-year old, Pu processing wastes from LANL. The contents were processed and repackaged in 2014. Processing activities at LANL included: 1) neutralization of acidic liquid contents, 2) sorption of the neutralized liquid, and 3) mixing of acidic nitrate salts with an absorber to meet waste acceptance criteria. The contents of 68660 and its sibling, 68685, were derived from the same parent drum, S855793. Drum S855793 originally contained ten plastic bags of acidic nitrate salts, and four bags of mixed nitrate and oxalate salts generated in 1985 by Pu recovery operations. These salts were predominantly oxalic acid, hydrated nitrate salts of Mg, Ca, and Fe, anhydrous Na(NO3), and minor amounts of anhydrous and hydrous nitrate salts of Pb, Al, K, Cr, and Ni. Other major components include sorbed water, nitric acid, dissolved nitrates, an absorbent (Swheat Scoop®) and a neutralizer (KolorSafe®). The contents of 68660 are described in greater detail in Appendix E of Wilson et al. (2015)

  16. Microsoft Word - PNNL 24125 Probative Investigation of the Thermal Stability of Wastes Involved in February 2014 WIPP Waste Dru

    Office of Environmental Management (EM)

    PART 970.doc Microsoft Word - PART 970.doc Microsoft Word - PART 970.doc (1.03 MB) More Documents & Publications Searchable Electronic Department of Energy Acquisition Regulation Microsoft Word - Matrixpart2.doc AcqGuide70.52Matrixpart2Redo-OPAM

    PNNL-24125 Limited Distribution Probative Investigation of the Thermal Stability of Wastes Involved in February 2014 WIPP Waste Drum Breach Event March 2015 RD Scheele JM Schwantes BK McNamara MJ Minette DT Hobbs (SRNL) CA Barrett PNNL-24125

  17. Report of biological investigations at the Los Medanos Waste Isolation Pilot Plant (WIPP) area of New Mexico during FY 1978

    SciTech Connect (OSTI)

    Best, T.L.; Neuhauser, S.

    1980-03-01

    The US Department of Energy is considering the construction of a Waste Isolation Pilot Plant (WIPP) in Eddy County, NM. This location is approximately 40 km east of Carlsbad, NM. Biological studies during FY 1978 were concentrated within a 5-mi radius of drill hole ERDA 9. Additional study areas have been established at other sites in the vicinity, e.g., the Gnome site, the salt lakes and several stations along the Pecos River southward from Carlsbad, NM, to the dam at Red Bluff Reservoir in Texas. The precise locations of all study areas are presented and their biology discussed.

  18. Thermography instruments for predictive maintenance

    SciTech Connect (OSTI)

    Palko, E.

    1993-08-12

    Thermography (infrared imaging, or IR scanning) is not only the most versatile predictive maintenance technology available today; it is, in general, the most cost-effective. Plant engineering can apply a virtually unlimited variety of predictive maintenance instruments, but all are restricted regarding the types of existing and incipient problems they can detect. Inplant applications of thermography, however, are truly limited only by the extent of the plant engineer's imagination. Here are ways that thermography can be used to fight downtime in plants, and factors to consider when selecting the best instrument for particular circumstances.

  19. Operations and Maintenance Manual for Large Aperture Scanner System

    SciTech Connect (OSTI)

    Jones, Anthony M.; Hall, Thomas E.

    2010-04-08

    Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

  20. Maintenance neutron coincidence counter manual

    SciTech Connect (OSTI)

    Krick, M.S.; Polk, P.J.; Atencio, J.D.

    1989-09-01

    A compact thermal-neutron coincidence counter has been constructed specifically for use by the International Atomic Energy Agency as a reference neutron detector for maintenance activities. The counter is designed for use only with {sup 252}Cf sources in SR-CF-100 capsules. This manual describes the detector's mechanical and electrical components and its operating characteristics. 2 refs., 8 figs.

  1. Drive alignment pays maintenance dividends

    SciTech Connect (OSTI)

    Fedder, R.

    2008-12-15

    Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

  2. DE-EM-0001971 WIPP M&O D-i PART I - THE SCHEDULE SECTION D PACKAGING AND MARKING

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D-i PART I - THE SCHEDULE SECTION D PACKAGING AND MARKING Table of Content D-1 PACKAGING ....................................................................................................... 1 D-2 MARKING ........................................................................................................... 1 DE-EM-0001971 WIPP M&O D-1 PART I - THE SCHEDULE SECTION D PACKAGING AND MARKING D-1 PACKAGING Preservation, packaging, and packing for shipment or mailing of all work delivered

  3. DE-EM-0001971 WIPP M&O E-i PART I - THE SCHEDULE SECTION E INSPECTION AND ACCEPTANCE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E-i PART I - THE SCHEDULE SECTION E INSPECTION AND ACCEPTANCE Table of Content E.1 FAR 52.246-5 INSPECTION OF SERVICES--COST- REIMBURSEMENT (APR 1984) ................................................................................................................... 1 E.2 ACCEPTANCE .................................................................................................... 1 DE-EM-0001971 WIPP M&O E-1 PART I - THE SCHEDULE SECTION E INSPECTION AND ACCEPTANCE E.1 FAR 52.246-5

  4. DE-EM-0001971 WIPP M&O F-i PART I - THE SCHEDULE SECTION F DELIVERIES OR PERFORMANCE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F-i PART I - THE SCHEDULE SECTION F DELIVERIES OR PERFORMANCE Table of Content F.1 PERIOD OF PERFORMANCE ............................................................................ 1 F.2 PRINCIPAL PLACE OF PERFORMANCE .......................................................... 1 F.3 STOP-WORK ORDER (FAR 52.242-15) (AUG 1989)(ALTERNATE I) (APR 1984) ................................................................................................................... 1 DE-EM-0001971 WIPP M&O F-1

  5. DE-EM-0001971 WIPP M&O G-i PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G-i PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA Table of Content G.1 TECHNICAL AND ADMINISTRATIVE CORRESPONDENCE/MATTERS .......... 1 G.2 DOE ORGANIZATIONAL PROPERTY MANAGEMENT OFFICER .................... 1 G.3 CONTRACTOR CONTACT ................................................................................. 2 G.4 COST REPORTING PROCEDURES................................................................... 2 DE-EM-0001971 WIPP M&O G-1 PART I - THE SCHEDULE SECTION G

  6. Prediction of dissolved actinide concentrations in concentrated electrolyte solutions: a conceptual model and model results for the Waste Isolation Pilot Plant (WIPP)

    SciTech Connect (OSTI)

    Novak, C.F.; Moore, R.C.; Bynum, R.V.

    1996-10-25

    The conceptual model for WIPP dissolved concentrations is a description of the complex natural and artificial chemical conditions expected to influence dissolved actinide concentrations in the repository. By a set of physical and chemical assumptions regarding chemical kinetics, sorption substrates, and waste-brine interactions, the system was simplified to be amenable to mathematical description. The analysis indicated that an equilibrium thermodynamic model for describing actinide solubilities in brines would be tractable and scientifically supportable. This paper summarizes the conceptualization and modeling approach and the computational results as used in the WIPP application for certification of compliance with relevant regulations for nuclear waste repositories. The WIPP site contains complex natural brines ranging from sea water to 10x more concentrated than sea water. Data bases for predicting solubility of Am(III) (as well as Pu(III) and Nd(III)), Th(IV), and Np(V) in these brines under potential repository conditions have been developed, focusing on chemical interactions with Na, K, Mg, Cl, SO{sub 4}, and CO{sub 3} ions, and the organic acid anions acetate, citrate, EDTA, and oxalate. The laboratory and modeling effort augmented the Harvie et al. parameterization of the Pitzer activity coefficient model so that it could be applied to the actinides and oxidation states important to the WIPP system.

  7. A comparison of real-time radiography results and visual characterization results with emphasis on WIPP WAC and TRAMPAC compliance issues

    SciTech Connect (OSTI)

    Hailey, S.M.

    1994-11-01

    Visual characterization provides a means of confirming the real-time radiography (RTR) certification process and process knowledge. RTR and visual characterization have been conducted on thirty-three drums containing transuranic (TRU) waste in support of the Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP) at the Idaho National Engineering Laboratory. Argonne National Laboratory - West (ANL-W) detected a small can of liquid in one of these drums during the visual examination, resulting in a WIPP Waste Acceptance Criteria (WIPP-WAC) miscertification. The remaining thirty-two drums were certified correctly by the RTR system at the Stored Waste Examination Pilot Plant (SWEPP) for WIPP-WAC and TRUPACT-II Authorized Methods for Payload Control (TRAMPAC) requirements. TRAMPAC contains restrictions on the weights of specific materials allowed in the waste, based on the shipping category. Items on the restricted list for a given shipping category are allowed in quantities less than 1 percent of the weight of the waste. RTR can estimate the weights of certain broad categories in homogeneous waste forms, however, the capability to estimate weights at the 1 percent level is not presently realistic. Process knowledge forms the basis of conformance to these weight requirements. Visual characterization suggests process knowledge is not completely adequate at this level.

  8. Operations and Maintenance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Operations and Maintenance Operations and Maintenance Photo of a man, wearing a yellow hard hat, looking at a wall with panels and wires mounted to it. Lower ...

  9. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming...

  10. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. Operations & Maintenance Best Practices Guide: Chapter 9

    Broader source: Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  12. Reliability centered maintenance (RCM) products - future

    SciTech Connect (OSTI)

    Lyons, P.F.

    1996-08-01

    This paper summarizes products related to RCM of power systems which will soon be available. The titles include: substation RCM handbook and software; substation RCM driven productive maintenance; transmission RCM evaluation; transmission inspection and maintenance workstation; transmission inspection and detection methods; substation RCM implementation and software support; substation maintenance management workstation; transmission RCM handbook and software; transmission inspection and maintenance workstation - TC; distribution RCM handbook and software; transmission RCM implementation and software support; and distribution RCM implementation and software support.

  13. CRAD, Maintenance Assessment Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to

  14. Operations & Maintenance Best Practices Guide: Appendix a

    Broader source: Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  15. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  16. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  17. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  18. Operations & Maintenance Best Practices Guide: Chapter 1

    Broader source: Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  19. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  20. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  1. Operations & Maintenance Best Practices Guide: Chapter 7

    Broader source: Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  2. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  3. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  4. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  5. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  6. SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance

    Office of Environmental Management (EM)

    SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance and Maintenance Review Process Surveillance and Maintenance Overview What is RBSM and why do I need this ...

  7. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. |...

  8. Solar Water Heating System Maintenance and Repair | Department...

    Energy Savers [EERE]

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | ...

  9. WIPP WAC Equivalence Support Measurements for Low-Level Sludge Waste at Los Alamos National Laboratory - 12242

    SciTech Connect (OSTI)

    Gruetzmacher, Kathleen M.; Bustos, Roland M.; Ferran, Scott G.; Gallegos, Lucas E.; Lucero, Randy P.

    2012-07-01

    Los Alamos National Laboratory (LANL) uses the Nevada National Security Site (NNSS) as an off-site disposal facility for low-level waste (LLW), including sludge waste. NNSS has issued a position paper that indicates that systems that are not certified by the Carlsbad Field Office (CBFO) for Waste Isolation Pilot Plant (WIPP) disposal of Transuranic (TRU) waste must demonstrate equivalent practices to the CBFO certified systems in order to assign activity concentration values to assayed items without adding in the Total Measurement Uncertainty (TMU) when certifying waste for NNSS disposal. Efforts have been made to meet NNSS requirements to accept sludge waste for disposal at their facility. The LANL LLW Characterization Team uses portable high purity germanium (HPGe) detector systems for the nondestructive assay (NDA) of both debris and sludge LLW. A number of performance studies have been conducted historically by LANL to support the efficacy and quality of assay results generated by the LANL HPGe systems, and, while these detector systems are supported by these performance studies and used with LANL approved procedures and processes, they are not certified by CBFO for TRU waste disposal. Beginning in 2009, the LANL LLW Characterization Team undertook additional NDA measurements of both debris and sludge simulated waste containers to supplement existing studies and procedures to demonstrate full compliance with the NNSS position paper. Where possible, Performance Demonstration Project (PDP) drums were used for the waste matrix and PDP sources were used for the radioactive sources. Sludge drums are an example of a matrix with a uniform distribution of contaminants. When attempting to perform a gamma assay of a sludge drum, it is very important to adequately simulate this uniform distribution of radionuclides in order to accurately model the assay results. This was accomplished by using a spiral radial source tube placement in a sludge drum rather than the standard

  10. Milestones for disposal of radioactive waste at the Waste Isolation Pilot Plant (WIPP) in the United States

    SciTech Connect (OSTI)

    RECHARD,ROBERT P.

    2000-03-01

    The opening of the Waste Isolation Pilot Plant on March 26, 1999, was the culmination of a regulatory assessment process that had taken 25 years. National policy issues, negotiated agreements, and court settlements during the first 15 years of the project had a strong influence on the amount and type of scientific data collected up to this point. Assessment activities before the mid 1980s were undertaken primarily (1) to satisfy needs for environmental impact statements, (2) to satisfy negotiated agreements with the State of New Mexico, or (3) to develop general understanding of selected natural phenomena associated with nuclear waste disposal. In the last 10 years, federal compliance policy and actual regulations were sketched out, and continued to evolve until 1996. During this period, stochastic simulations were introduced as a tool for the assessment of the WIPP's performance, and four preliminary performance assessments, one compliance performance assessment, and one verification performance assessment were performed.

  11. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 6, Chapter D, Appendices D4--D13: Revision 1.0

    SciTech Connect (OSTI)

    Not Available

    1991-12-31

    This report (Vol. 6) for the WIPP facility contains appendices on the following information: Site characterization; general geology; ecological monitoring; and chemical compatibility of waste forms and container materials.

  12. Ultrasonic dip seal maintenance system

    DOE Patents [OSTI]

    Poindexter, Allan M.; Ricks, Herbert E.

    1978-01-01

    A system for removing impurities from the surfaces of liquid dip seals and or wetting the metal surfaces of liquid dip seals in nuclear components. The system comprises an ultrasonic transducer that transmits ultrasonic vibrations along an ultrasonic probe to the metal and liquid surfaces of the dip seal thereby loosening and removing those impurities.

  13. No maintenance -- no energy efficiency

    SciTech Connect (OSTI)

    Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

    1994-12-01

    Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

  14. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  15. Scheduled Maintenance Periods | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled Maintenance Periods The CNM holds three maintenance periods per year. During these times certain CNM facilities may not be available for user activities. The Sector 26 beamline will not be available, the High-Performance Computing Cluster and nanofabrication facilities often are not available, and other facilities may undergo maintenance for only one or two days. Please contact your CNM Scientific Contact prior to arrival and plan your work visits and schedules accordingly. To better

  16. CRAD, NNSA - Maintenance (MN) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NNSA - Maintenance (MN) CRAD, NNSA - Maintenance (MN) CRAD for Maintenance (MN). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs. CRADs consist of a Performance Objective that identifies the expectation(s) or requirement(s) to be verified, which reflect the complete scope of the assessment; Criteria that provide specifics by which the performance objectives are measured, including

  17. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  18. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  19. Improve Operations & Maintenance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Every building's energy consumption can benefit from rigorous operations and maintenance ... for improvement, and implement low-cost changes to reduce energy consumption. ...

  20. Surveillance & Maintenance: The Requirements Based Surveillance and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance Review Process (RBSM) | Department of Energy Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in