National Library of Energy BETA

Sample records for windy land area

  1. An assessment of the available windy land area and wind energy potential in the contiguous United States

    SciTech Connect (OSTI)

    Elliott, D.L.; Wendell, L.L.; Gower, G.L.

    1991-08-01

    Estimates of land areas with various levels of wind energy resource and resultant wind energy potential have been developed for each state in the contiguous United States. The estimates are based on published wind resource data and account for the exclusion of some windy lands as a result of environmental and land-use considerations. Despite these exclusions, the amount of wind resource estimated over the contiguous United States is surprisingly large and has the potential to supply a substantial fraction of the nation's energy needs, even with the use of today's wind turbine technology. Although this study shows that, after exclusions, only about 0.6% of the land area in the contiguous United States is characterized by high wind resource (comparable to that found in windy areas of California where wind energy is being cost-effectively developed), the wind electric potential that could be extracted with today's technology from these areas across the United States is equivalent to about 20% of the current US electric consumption. Future advances in wind turbine technology will further enhance the potential of wind energy. As advances in turbine technology allow areas of moderate wind resource to be developed, more than a tenfold increase in the wind energy potential is possible. These areas, which cover large sections of the Great Plains and are widely distributed throughout many other sections of the country, have the potential of producing more than three times the nation's current electric consumption. 9 refs., 12 figs., 13 tabs.

  2. Windy Flats | Open Energy Information

    Open Energy Info (EERE)

    Flats Jump to: navigation, search Name Windy Flats Facility Windy Flats Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Cannon Power Group...

  3. Windy Dog I | Open Energy Information

    Open Energy Info (EERE)

    Dog I Jump to: navigation, search Name Windy Dog I Facility Windy Dog I Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Windy Dog I LLC...

  4. Windy Flats IIa extension | Open Energy Information

    Open Energy Info (EERE)

    IIa extension Jump to: navigation, search Name Windy Flats IIa extension Facility Windy Flats IIa extension Sector Wind energy Facility Type Commercial Scale Wind Facility Status...

  5. Windy Flats Phase III | Open Energy Information

    Open Energy Info (EERE)

    Phase III Jump to: navigation, search Name Windy Flats Phase III Facility Windy Flats Phase III Sector Wind energy Facility Type Commercial Scale Wind Facility Status Proposed...

  6. EA-1610: Windy Hollow Wind Project, Laramie County, Wyoming

    Broader source: Energy.gov [DOE]

    This EA will evaluate the environmental impacts of a proponent request to interconnect their proposed Windy Hollow Wind Project in Laramie County, Wyoming, to DOE’s Western Area Power Administration’s transmission system.

  7. Windy City Renewable Energy LLC | Open Energy Information

    Open Energy Info (EERE)

    Windy City Renewable Energy LLC Jump to: navigation, search Logo: Windy City Renewable Energy LLC Name: Windy City Renewable Energy LLC Place: Chicago, Illinois Zip: 60606 Sector:...

  8. Windy Point (08) Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    (08) Wind Farm Jump to: navigation, search Name Windy Point (08) Wind Farm Facility Windy Point (08) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  9. Windy Point - Siemens Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Siemens Wind Farm Jump to: navigation, search Name Windy Point - Siemens Wind Farm Facility Windy Point - Siemens Sector Wind energy Facility Type Commercial Scale Wind Facility...

  10. Windy Point - REpower (09) Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    REpower (09) Wind Farm Jump to: navigation, search Name Windy Point - REpower (09) Wind Farm Facility Windy Point - REpower (09) Sector Wind energy Facility Type Commercial Scale...

  11. Windy Flats(3Q09 portion) | Open Energy Information

    Open Energy Info (EERE)

    Flats(3Q09 portion) Jump to: navigation, search Name Windy Flats(3Q09 portion) Facility Windy Flats(3Q09 portion) Sector Wind energy Facility Type Commercial Scale Wind Facility...

  12. Exploratory Well At Salt Wells Area (Bureau of Land Management...

    Open Energy Info (EERE)

    Bureau of Land Management, 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Salt Wells Area (Bureau of Land Management,...

  13. Landed Costs of Imported Crude by Area

    U.S. Energy Information Administration (EIA) Indexed Site

    Area (Dollars per Barrel) Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Area Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 View History Average Landed Cost 27.34 26.97 31.99 35.42 40.63 43.87 1973-2016 Persian Gulf 30.92 30.69 34.60 38.00 42.33 45.05 1996-2016 Total OPEC 28.98 29.49 33.87 36.78 42.34 45.06 1973-2016 Non OPEC 26.25 25.42 30.39 34.42 39.56 43.08 1973-2016 Selected Countries Canada 26.21 24.61

  14. Magnetotellurics At Salt Wells Area (Bureau of Land Management...

    Open Energy Info (EERE)

    Salt Wells Area (Bureau of Land Management, 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Magnetotellurics At Salt Wells Area (Bureau of...

  15. AmeriFlux US-SuW Maui Sugarcane Windy

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Anderson, Ray [USDA-Agricultural Research Service, United States Salinity Laboratory, Contaminant Fate and Transport Unit; Wang, Dong [USDA - Agricultural Research Service, San Joaquin Valley Agricultural Sciences Center, Water Management Research Unit

    2016-01-01

    This is the AmeriFlux version of the carbon flux data for the site US-SuW Maui Sugarcane Windy. Site Description - Continuous, irrigated, sugarcane cultivation for >100 years. Practice is to grow plant sugarcane for 2 years, drydown, burn leaves, harvest cane, and then till and replant very shortly after harvest. Site differs from Sugarcane Lee/Sheltered and Sugarcane Middle in soil type and site meteorology.

  16. EIS-0370: Windy Gap Firming Project, Colorado

    Broader source: Energy.gov [DOE]

    This EIS, prepared by the Department of the Interior (Bureau of Reclamation, Great Plains Region), with DOE's Western Area Power Administration as a cooperating agency, evaluates the environmental impacts of a proposal to construct new water storage reservoir capacity southwest of Loveland, Colorado. Western has jurisdiction over the transmission line that would be relocated if the proposed action is implemented and would market additional power that may be generated as a result of the project.

  17. Big Windy Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Features: Relict Geothermal Features: Volcanic Age: Host Rock Age: Host Rock Lithology: Cap Rock Age: Cap Rock Lithology: Click "Edit With Form" above to add content Geofluid...

  18. Thermal Gradient Holes At Salt Wells Area (Bureau of Land Management...

    Open Energy Info (EERE)

    Salt Wells Area (Bureau of Land Management, 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermal Gradient Holes At Salt Wells Area...

  19. Ground Gravity Survey At Salt Wells Area (Bureau of Land Management...

    Open Energy Info (EERE)

    2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Salt Wells Area (Bureau of Land Management, 2009) Exploration...

  20. DOE - Office of Legacy Management -- Shallow Land Disposal Area - PA 45

    Office of Legacy Management (LM)

    Shallow Land Disposal Area - PA 45 FUSRAP Considered Sites Shallow Land Disposal Area, PA Alternate Name(s): Parks Township Shallow Land Disposal Area Nuclear Materials and Equipment Corporation (NUMEC) Babcock and Wilcox Parks Facilities PA.45-1 PA.45-5 PA.45-6 Location: PA Route 66 and Kissimere Road, Parks Township, Apollo, Pennsylvania PA.45-1 Historical Operations: Fabricated nuclear fuel under an NRC license as an extension of NUMEC Apollo production facilities. PA.45-1 PA.45-5 Eligibility

  1. Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-11-01

    The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

  2. EIS-0370: Windy Gap Firming Project; North Central Colorado

    Broader source: Energy.gov [DOE]

    This EIS, prepared by the Department of the Interior (Bureau of Reclamation, Great Plains Region), with DOE's Western Area Power Administration as a cooperating agency, evaluates the environmental impacts of a proposal to construct new water storage reservoir capacity southwest of Loveland, Colorado. Western has jurisdiction over the transmission line that would be relocated if the proposed action is implemented and would market additional power that may be generated as a result of the project.

  3. Higher U.S. Crop Prices Trigger Little Area Expansion so Marginal Land for Biofuel Crops Is Limited

    SciTech Connect (OSTI)

    Swinton, S.; Babcock, Bruce; James, Laura; Bandaru, Varaprasad

    2011-06-12

    By expanding energy biomass production on marginal lands that are not currently used for crops, food price increases and indirect climate change effects can be mitigated. Studies of the availability of marginal lands for dedicated bioenergy crops have focused on biophysical land traits, ignoring the human role in decisions to convert marginal land to bioenergy crops. Recent history offers insights about farmer willingness to put non-crop land into crop production. The 2006-09 leap in field crop prices and the attendant 64% gain in typical profitability led to only a 2% increase in crop planted area, mostly in the prairie states

  4. Habitat Evaluation Procedures (HEP) Report; Precious Lands Wildlife Management Area, Technical Report 2000-2003.

    SciTech Connect (OSTI)

    Kozusko, Shana

    2003-12-01

    The Nez Perce Tribe (NPT) currently manages a 15,325 acre parcel of land known as the Precious Lands Wildlife Management Area that was purchased as mitigation for losses incurred by construction of the four lower Snake River dams. The Management Area is located in northern Wallowa County, Oregon and southern Asotin County, Washington (Figure 1). It is divided into three management parcels--the Buford parcel is located on Buford Creek and straddles the WA-OR state line, and the Tamarack and Basin parcels are contiguous to each other and located between the Joseph Creek and Cottonwood Creek drainages in Wallowa County, OR. The project was developed under the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L. 96-501), with funding from the Bonneville Power Administration (BPA). The acreage protected under this contract will be credited to BPA as habitat permanently dedicated to wildlife and wildlife mitigation. A modeling strategy known as Habitat Evaluation Procedure (HEP) was developed by the U.S. Fish and Wildlife Service and adopted by BPA as a habitat equivalency accounting system. Nine wildlife species models were used to evaluate distinct cover type features and provide a measure of habitat quality. Models measure a wide range of life requisite variables for each species and monitor overall trends in vegetation community health and diversity. One product of HEP is an evaluation of habitat quality expressed in Habitat Units (HUs). This HU accounting system is used to determine the amount of credit BPA receives for mitigation lands. After construction of the four lower Snake River dams, a HEP loss assessment was conducted to determine how many Habitat Units were inundated behind the dams. Twelve target species were used in that evaluation: Canada goose, mallard, river otter, downy woodpecker, song sparrow, yellow warbler, marsh wren, western meadowlark, chukar, ring-necked pheasant, California quail, and mule deer. The U.S. Army Corp of

  5. Land Use and Watersheds: Human Influence on Hydrology and Geomorphology in Urban and Forest Areas. Water Science and Application Series

    SciTech Connect (OSTI)

    Wigmosta, Mark S.; Burges, S J.

    2001-10-01

    What is the effect of urbanization and forest use on hydrologic and geomorphic processes? How can we develop land use policies that minimize adverse impacts on ecosystems while sustaining biodiversity? Land Use and Watersheds: Human Influence on Hydrology and Geomorphology in Urban and Forest Areas addresses these issues and more. By featuring watersheds principally in the American Pacific Northwest, and the effects of timber harvesting and road construction on stream flow, sediment yield and landslide occurrence, scientists can advance their understanding of what constitutes appropriate management of environments with similar hydro-climatic-geomorphic settings worldwide.

  6. TRIDEC Land TRIDEC Land Transfer REQUEST Transfer REQUEST

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Area TRIDEC Land TRIDEC Land Transfer REQUEST Transfer REQUEST 300 Acres 300 Acres Additional Lands Additional Lands Identified for Identified for EA Analysis EA Analysis 2,772...

  7. Comparison of Daytime and Nighttime Populations Adjacent to Interstate Highways in Metropolitan Areas Using LandScan USA

    SciTech Connect (OSTI)

    Johnson, Paul E

    2007-01-01

    An article of similar title was published in the International Journal of Radioactive Materials Transport in 1999. The study concluded that the daytime and nighttime populations are not substantially different for the metropolitan areas examined. This study revisits the issue, but using the LandScan USA high resolution population distribution data, which includes daytime and night-time population. Segments of Interstate highway beltways, along with the direct route through the city, for Atlanta, St. Louis, and Kansas City are examined with an 800m buffer from either side of the highways. The day/night ratio of population is higher using the LandScan USA data. LandScan USA daytime and night-time data will be incorporated into the TRAGIS routing model in future.

  8. EA-1936: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure, and Natural Area Management Responsibility, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    NOTE: This EA has been cancelled. This EA will evaluate the environmental impacts of DOE’s proposed modifications to the allowable land uses, utility infrastructure, and Natural Area management responsibility for Parcel ED-1. The purpose of the modifications is to enhance the development potential of the Horizon Center business/industrial park, while ensuring protection of the adjacent Natural Area. The area addressed by the proposed action was evaluated for various industrial/business uses in the Environmental Assessment Addendum for the Proposed Title Transfer of Parcel ED-1, DOE/EA-1113-A.

  9. EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

  10. Survey of Revegetated Areas on the Fitzner/Eberhardt Arid Lands Ecology Reserve: Status and Initial Monitoring Results

    SciTech Connect (OSTI)

    Downs, Janelle L.; Link, Steven O.; Rozeboom, Latricia L.; Durham, Robin E.; Cruz, Rico O.; Mckee, Sadie A.

    2011-09-01

    During 2010, the U.S. Department of Energy (DOE), Richland Operations Office removed a number of facilities and debris from the Fitzner/Eberhardt Arid Lands Ecology Reserve (ALE), which is part of the Hanford Reach National Monument (HRNM). Revegetation of disturbed sites is necessary to stabilize the soil, reduce invasion of these areas by exotic weeds, and to accelerate re-establishment of native plant communities. Seven revegetation units were identified on ALE based on soils and potential native plant communities at the site. Native seed mixes and plant material were identified for each area based on the desired plant community. Revegetation of locations affected by decommissioning of buildings and debris removal was undertaken during the winter and early spring of 2010 and 2011, respectively. This report describes both the details of planting and seeding for each of the units, describes the sampling design for monitoring, and summarizes the data collected during the first year of monitoring. In general, the revegetation efforts were successful in establishing native bunchgrasses and shrubs on most of the sites within the 7 revegetation units. Invasion of the revegetation areas by exotic annual species was minimal for most sites, but was above initial criteria in 3 areas: the Hodges Well subunit of Unit 2, and Units 6 and 7.

  11. Final report of the decontamination and decommissioning of the exterior land areas at the Grand Junction Projects Office facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1995-09-01

    The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility occupies approximately 56.4 acres (22.8 hectares) along the Gunnison River near Grand Junction, Colorado. The site was contaminated with uranium ore and mill tailings during uranium-refining activities conducted by the Manhattan Engineer District and during pilot-milling experiments conducted for the US Atomic Energy Commission`s (AEC`s) domestic uranium procurement program. The GJPO facility was the collection and assay point for AEC uranium and vanadium oxide purchases until the early 1970s. The DOE Decontamination and Decommissioning Program sponsored the Grand Junction Projects Office Remedial Action Project (GJPORAP) to remediate the facility lands, site improvements, and the underlying aquifer. The site contractor, Rust Geotech, was the Remedial Action Contractor for GJPORAP. The exterior land areas of the facility assessed as contaminated have been remediated in accordance with identified standards and can be released for unrestricted use. Restoration of the aquifer will be accomplished through the natural flushing action of the aquifer during the next 50 to 80 years. The remediation of the DOE-GJPO facility buildings is ongoing and will be described in a separate report.

  12. EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah

    Broader source: Energy.gov [DOE]

    This EIS is being prepared jointly by DOE’s Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western’s proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

  13. Diagenetic history and hydrocarbon potential of Upper Permian carbonate buildups, Wegener Halvoe area, Jameson Land basin, east Greenland

    SciTech Connect (OSTI)

    Scholle, P.A.; Ulmer, D.S. ); Stemmerik, L. )

    1991-04-01

    The Upper Permian of Jameson Land includes two carbonate sequences, the Karstryggen and Wegener Halvoe formations. The Karstryggen Formation contains hypersaline carbonates and localized evaporites that were heavily weathered and dissected prior to deposition of the overlying strata. The overlying Wegener Halvoe Formation represents an abrupt and extensive marine inundation over the underlying karstified Karstryggen surface. Bryozoan-brachiopod-algal-cement buildups of the Wegener Halvoe Formation are localized on karstic highs, and show up to 150 m of depositional relief. The diagenetic histories of the core and flank facies are very different. Core facies porosity was initially obliterated by marine cements, but repeated meteoric exposure altered unstable core facies constituents. This alteration produced extensive secondary porosity through grain and cement leaching with local collapse brecciation. Flank strata, however, underwent little sea-floor diagenesis, and low permeability and mineralogically stable grain composition protected these strata from meteoric alteration. Subsequent fracturing and hydrothermal fluid flow, however, flushed hydrocarbons and filled pores with ferroan calcite, barite, fluorite, galena, and baroque dolomite. This heating and flushing is thought to have been especially intense in the Wegener Halvoe region; thus, more basinal areas may still have reservoirs containing significant oil in equivalent Upper Permian limestones. If, as is likely, the sea level changes affecting the Greenland Permian were eustatic, then this study may provide significant clues to porosity development throughout the largely unexplored northern Zechstein basin and the Arctic basin of the Barent Sea. This study also provides some important connections to the probably time-equivalent Guadalupian carbonate reservoir rocks of west Texas-New Mexico and Wyoming.

  14. IDRISI Land Change Modeler | Open Energy Information

    Open Energy Info (EERE)

    IDRISI Land Change Modeler Jump to: navigation, search Tool Summary LAUNCH TOOL Name: IDRISI Land Change Modeler AgencyCompany Organization: Clark Labs Sector: Land Focus Area:...

  15. Revegetation Plan for Areas of the Fitzner-Eberhardt Arid Lands Ecology Reserve Affected by Decommissioning of Buildings and Infrastructure and Debris Clean-up Actions

    SciTech Connect (OSTI)

    Downs, Janelle L.; Durham, Robin E.; Larson, Kyle B.

    2011-01-01

    The U.S. Department of Energy (DOE), Richland Operations Office is working to remove a number of facilities on the Fitzner Eberhardt Arid Lands Ecology Reserve (ALE), which is part of the Hanford Reach National Monument. Decommissioning and removal of buildings and debris on ALE will leave bare soils and excavated areas that need to be revegetated to prevent erosion and weed invasion. Four main areas within ALE are affected by these activities (DOE 2009;DOE/EA-1660F): 1) facilities along the ridgeline of Rattlesnake Mountain, 2) the former Nike missile base and ALE HQ laboratory buildings, 3) the aquatic research laboratory at Rattlesnake Springs area, and 4) a number of small sites across ALE where various types of debris remain from previous uses. This revegetation plan addresses the revegetation and restoration of those land areas disturbed by decommissioning and removal of buildings, facilities and associated infrastructure or debris removal. The primary objective of the revegetation efforts on ALE is to establish native vegetation at each of the sites that will enhance and accelerate the recovery of the native plant community that naturally persists at that location. Revegetation is intended to meet the direction specified by the Environmental Assessment (DOE 2009; DOE/EA-1660F) and by Stipulation C.7 of the Memorandum of Agreement (MOA) for the Rattlesnake Mountain Combined Community Communication Facility and InfrastructureCleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland Washington(DOE 2009; Appendix B). Pacific Northwest National Laboratory (PNNL) under contract with CH2M Hill Plateau Remediation Company (CPRC) and in consultation with the tribes and DOE-RL developed a site-specific strategy for each of the revegetation units identified within this document. The strategy and implementation approach for each revegetation unit identifies an appropriate native species mix and outlines the necessary site preparation activities

  16. Archaeology on Lab Land

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Archaeology on Lab Land Archaeology on Lab Land People have lived in this area for more than 5,000 years. Lab archaeologists are studying and preserving the ancient human occupation of the Pajarito Plateau. Archaeology on Lab Land exhibit Environmental Research & Monitoring Visit our exhibit and find out how Los Alamos researchers are studying our rich cultural diversity. READ MORE Nake'muu archaeological site Unique Archaeology The thousands of Ancestral Pueblo sites identified on Lab land

  17. EA-1640: Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    DOE’s Oak Ridge Operations Office issued a final EA and a finding of no significant impact for a proposal to convey DOE property located at the East Tennessee Technology Park and the surrounding area to the Community Reuse Organization of East Tennessee, City of Oak Ridge, other agencies, or private entities for mixed use economic development.Public Comment Opportunities.

  18. Figure 1. Project Area, Focused Study Area, Potential Access...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Page 4 of 8 Figure 1. Project Area, Focused Study Area, Potential Access Agreement Land, and Land Not Suitable for Conveyance

  19. Figure 1. Project Area, Focused Study Area, Potential Access...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Page 4 of 8 Figure 1. Project Area, Focused Study Area, Potential Access Agreement Land, and Land Not Suitable for Conveyance...

  20. In-Situ Radiological Surveys to Address Nuclear Criticality Safety Requirements During Remediation Activities at the Shallow Land Disposal Area, Armstrong County, Pennsylvania - 12268

    SciTech Connect (OSTI)

    Norris, Phillip; Mihalo, Mark; Eberlin, John; Lambert, Mike; Matthews, Brian

    2012-07-01

    Cabrera Services Inc. (CABRERA) is the remedial contractor for the Shallow Land Disposal Area (SLDA) Site in Armstrong County Pennsylvania, a United States (US) Army Corps of Engineers - Buffalo District (USACE) contract. The remediation is being completed under the USACE's Formerly Utilized Sites Remedial Action Program (FUSRAP) which was established to identify, investigate, and clean up or control sites previously used by the Atomic Energy Commission (AEC) and its predecessor, the Manhattan Engineer District (MED). As part of the management of the FUSRAP, the USACE is overseeing investigation and remediation of radiological contamination at the SLDA Site in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 US Code (USC), Section 9601 et. seq, as amended and, the National Oil and Hazardous Substance Pollution Contingency Plan (NCP), Title 40 of the Code of Federal Regulations (CFR) Section 300.430(f) (2). The objective of this project is to clean up radioactive waste at SLDA. The radioactive waste contains special nuclear material (SNM), primarily U-235, in 10 burial trenches, Cabrera duties include processing, packaging and transporting the waste to an offsite disposal facility in accordance with the selected remedial alternative as defined in the Final Record of Decision (USACE, 2007). Of particular importance during the remediation is the need to address nuclear criticality safety (NCS) controls for the safe exhumation and management of waste containing fissile materials. The partnership between Cabrera Services, Inc. and Measutronics Corporation led to the development of a valuable survey tool and operating procedure that are essential components of the SLDA Criticality Safety and Material Control and Accountability programs. Using proven existing technologies in the design and manufacture of the Mobile Survey Cart, the continued deployment of the Cart will allow for an efficient and reliable methodology to

  1. A tiered approach for the human health risk assessment for consumption of vegetables from with cadmium-contaminated land in urban areas

    SciTech Connect (OSTI)

    Swartjes, Frank A. Versluijs, Kees W.; Otte, Piet F.

    2013-10-15

    Consumption of vegetables that are grown in urban areas takes place worldwide. In developing countries, vegetables are traditionally grown in urban areas for cheap food supply. In developing and developed countries, urban gardening is gaining momentum. A problem that arises with urban gardening is the presence of contaminants in soil, which can be taken up by vegetables. In this study, a scientifically-based and practical procedure has been developed for assessing the human health risks from the consumption of vegetables from cadmium-contaminated land. Starting from a contaminated site, the procedure follows a tiered approach which is laid out as follows. In Tier 0, the plausibility of growing vegetables is investigated. In Tier 1 soil concentrations are compared with the human health-based Critical soil concentration. Tier 2 offers the possibility for a detailed site-specific human health risk assessment in which calculated exposure is compared to the toxicological reference dose. In Tier 3, vegetable concentrations are measured and tested following a standardized measurement protocol. To underpin the derivation of the Critical soil concentrations and to develop a tool for site-specific assessment the determination of the representative concentration in vegetables has been evaluated for a range of vegetables. The core of the procedure is based on Freundlich-type plantsoil relations, with the total soil concentration and the soil properties as variables. When a significant plantsoil relation is lacking for a specific vegetable a geometric mean of BioConcentrationFactors (BCF) is used, which is normalized according to soil properties. Subsequently, a conservative vegetable-group-consumption-rate-weighted BioConcentrationFactor is calculated as basis for the Critical soil concentration (Tier 1). The tool to perform site-specific human health risk assessment (Tier 2) includes the calculation of a realistic worst case site-specific vegetable

  2. INDEPENDENT CONFIRMATORY SURVEY REPORT FOR THE REACTOR BUILDING, HOT LABORATORY, PRIMARY PUMP HOUSE, AND LAND AREAS AT THE PLUM BROOK REACTOR FACILITY, SANDUSKY, OHIO

    SciTech Connect (OSTI)

    Erika N. Bailey

    2011-10-10

    In 1941, the War Department acquired approximately 9,000 acres of land near Sandusky, Ohio and constructed a munitions plant. The Plum Brook Ordnance Works Plant produced munitions, such as TNT, until the end of World War II. Following the war, the land remained idle until the National Advisory Committee for Aeronautics later called the National Aeronautics and Space Administration (NASA) obtained 500 acres to construct a nuclear research reactor designed to study the effects of radiation on materials used in space flight. The research reactor was put into operation in 1961 and was the first of fifteen test facilities eventually built by NASA at the Plum Brook Station. By 1963, NASA had acquired the remaining land at Plum Brook for these additional test facilities

  3. EIA - Greenhouse Gas Emissions - Land use

    Gasoline and Diesel Fuel Update (EIA)

    6. Land use 6.1. Total land use, land use change, and forests This chapter presents estimates of carbon sequestration (removal from the atmosphere) and emissions (release into the atmosphere) from forests, croplands, grasslands, and residential areas (urban trees, grass clippings, and food scraps) in the United States. In 2008, land use, land use change, and forests were responsible for estimated net carbon sequestration of 940 MMTCO2e (Table 31), representing 16 percent of total U.S. CO2

  4. Future land use plan

    SciTech Connect (OSTI)

    1995-08-31

    The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

  5. Sustainable Land Management Through Market-Oriented Commodity...

    Open Energy Info (EERE)

    Commodity Development: Case studies from Ethiopia AgencyCompany Organization: International Livestock Research Institute Sector: Land Focus Area: Agriculture Topics:...

  6. Land Use and Land Cover Change

    SciTech Connect (OSTI)

    Brown, Daniel; Polsky, Colin; Bolstad, Paul V.; Brody, Samuel D.; Hulse, David; Kroh, Roger; Loveland, Thomas; Thomson, Allison M.

    2014-05-01

    A contribution to the 3rd National Climate Assessment report, discussing the following key messages: 1. Choices about land-use and land-cover patterns have affected and will continue to affect how vulnerable or resilient human communities and ecosystems are to the effects of climate change. 2. Land-use and land-cover changes affect local, regional, and global climate processes. 3. Individuals, organizations, and governments have the capacity to make land-use decisions to adapt to the effects of climate change. 4. Choices about land use and land management provide a means of reducing atmospheric greenhouse gas levels.

  7. Landed Costs of Imported Crude by Area

    Gasoline and Diesel Fuel Update (EIA)

    Values shown for the current two months are preliminary. Values shown for the previous two months may be revised to account for late submissions and corrections. Final revisions to monthly and annual values are available upon publication of the June Petroleum Marketing Monthly. Annual averages that precede the release of the June Petroleum Marketing Monthly are calculated from monthly data. Data through 2015 are final.

  8. Landed Costs of Imported Crude by Area

    U.S. Energy Information Administration (EIA) Indexed Site

    107.07 103.00 88.29 1973-2014 Angola 61.32 80.61 114.05 114.95 110.81 99.25 1973-2014 Mexico 57.35 72.86 101.21 102.45 99.06 87.48 1973-2014 Nigeria 68.01 83.14 116.43 116.88...

  9. Rich land Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rich land Operations Office P.O. Box 550 July 10, 2009 CERTIFIED MAIL Mr. Ryan Jarvis Heart of America Northwest 1314 N.E. 56h" Street Suite 100 Seattle, Washington 98105 Dear Mr. Jarvis: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0054) Pursuant to the Freedom of Information Act (FOJA), you requested the following information as stated below: 1. "The RCRA permit (both Parts A and B) for the mixed waste disposal trenches 31 and 34 located in the 200 West area of Hanford, including,

  10. Micro-Earthquake At Geysers Area (Malin, Et Al., 2004) | Open...

    Open Energy Info (EERE)

    Peter E. Malin, Eylon Shalev, Min Lou, Silas M. Simiyu, Anastasia Stroujkova, Windy McCausland (2004) A Comprehensive Study Of Fracture Patterns And Densities In The...

  11. Land and Renewable Resources | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Land and Renewable Resources Argonne's environmental scientists conduct environmental impact statements to help the nation create a framework for developing renewable energy capabilities on public lands. Researchers in our Environmental Science division routinely conduct Environmental Impact Statements (EIS), which provide a rich and thorough analysis to determine what areas of public lands are best suited for solar, wind, and geothermal project development and assess the associated

  12. Oak Ridge reservation land-use plan

    SciTech Connect (OSTI)

    Bibb, W. R.; Hardin, T. H.; Hawkins, C. C.; Johnson, W. A.; Peitzsch, F. C.; Scott, T. H.; Theisen, M. R.; Tuck, S. C.

    1980-03-01

    This study establishes a basis for long-range land-use planning to accommodate both present and projected DOE program requirements in Oak Ridge. In addition to technological requirements, this land-use plan incorporates in-depth ecological concepts that recognize multiple uses of land as a viable option. Neither environmental research nor technological operations need to be mutually exclusive in all instances. Unique biological areas, as well as rare and endangered species, need to be protected, and human and environmental health and safety must be maintained. The plan is based on the concept that the primary use of DOE land resources must be to implement the overall DOE mission in Oak Ridge. This document, along with the base map and overlay maps, provides a reasonably detailed description of the DOE Oak Ridge land resources and of the current and potential uses of the land. A description of the land characteristics, including geomorphology, agricultural productivity and soils, water courses, vegetation, and terrestrial and aquatic animal habitats, is presented to serve as a resource document. Essentially all DOE land in the Oak Ridge area is being fully used for ongoing DOE programs or has been set aside as protected areas.

  13. Geothermal Direct-Use — Minimizing Land Use and Impact

    Broader source: Energy.gov [DOE]

    With geothermal direct-use applications, land use issues usually only arise during exploration and development when geothermal reservoirs are located in or near urbanized areas, critical habitat...

  14. Oil and gas leasing in proposed wilderness areas: the Wyoming District Court's interpretation of Section 603 of the Federal Land Policy Management Act of 1976 - Rocky Mountain Oil and Gas Association v. Andrus, 500 F. Supp. 1338 (D. Wyo. 1980), appeal docketed, No. 81-1040 (10th Cir. Jan. 5, 1981)

    SciTech Connect (OSTI)

    Corbett, H.E.

    1982-01-01

    Plaintiff Rocky Mountain Oil and Gas Association, a non-profit trade association, brought suit against the Secretary of the Interior, challenging land management policies of the Department of the Interior which plaintiff contended have effectively prohibited oil and gas exploration in areas proposed as wilderness under the Federal Land Policy Management Act of 1976 (FLPMA). The principal issue at trial was Interior's interpretation of the wilderness study provisions contained in Section 603 of the Act, which directed that activities on oil and gas leases in proposed wilderness areas be managed so as to prevent impairment of wilderness values. The United States Court for the District of Wyoming, Kerr, J., held that strict application of the non-impairment standard of Section 603, FLPMA, by the Department of the Interior virtually halted oil and gas exploration in proposed wilderness areas, and is therefore statutorily erroneous, clearly contrary to Congressional intent, and counter-productive to public interest. The Trial Court's decision is being appealed to the Tenth Circuit Court of Appeals under the title Rocky Mountain Oil and Gas Association v. Watt. 91 references.

  15. Hierarchical Marginal Land Assessment for Land Use Planning

    SciTech Connect (OSTI)

    Kang, Shujiang; Post, Wilfred M; Wang, Dali; Nichols, Dr Jeff A; Bandaru, Vara Prasad

    2013-01-01

    Marginal land provides an alternative potential for food and bioenergy production in the face of limited land resources; however, effective assessment of marginal lands is not well addressed. Concerns over environmental risks, ecosystem services and sustainability for marginal land have been widely raised. The objective of this study was to develop a hierarchical marginal land assessment framework for land use planning and management. We first identified major land functions linking production, environment, ecosystem services and economics, and then classified land resources into four categories of marginal land using suitability and limitations associated with major management goals, including physically marginal land, biologically marginal land, environmental-ecological marginal land, and economically marginal land. We tested this assessment framework in south-western Michigan, USA. Our results indicated that this marginal land assessment framework can be potentially feasible on land use planning for food and bioenergy production, and balancing multiple goals of land use management. We also compared our results with marginal land assessment from the Conservation Reserve Program (CRP) and land capability classes (LCC) that are used in the US. The hierarchical assessment framework has advantages of quantitatively reflecting land functions and multiple concerns. This provides a foundation upon which focused studies can be identified in order to improve the assessment framework by quantifying high-resolution land functions associated with environment and ecosystem services as well as their criteria are needed to improve the assessment framework.

  16. Solar Development on Contaminated and Disturbed Lands

    SciTech Connect (OSTI)

    Macknick, Jordan; Lee, Courtney; Mosey, Gail; Melius, Jenny

    2013-12-01

    Land classified as contaminated and disturbed across the United States has the potential to host developments of utility-scale solar power. This report examines the prospect of developing utility- and commercial-scale concentrated solar power (CSP) and solar photovoltaics (PV) technologies on degraded and environmentally contaminated lands. The potential for solar development on contaminated anddisturbed lands was assessed, and for the largest and highest solar resource sites, the economic impacts and feasibility were evaluated. Developing solar power on contaminated and disturbed lands can help create jobs and revitalize local and state economies, and selecting these sites over greenfield sites can potentially have permitting and environmental mitigation advantages. The U.S.Department of Energy (DOE) SunShot goals call for 632 GW of PV and 83 GW of CSP to be deployed by 2050. Conservative land-use estimates of this study (10 acres per megawatt) show that there are disturbed and environmentally contaminated lands throughout the country that could be suitable for utility-scale solar power, and, that there is sufficient land area to meet SunShot solar deployment goals. The purpose of this assessment is to improve the understanding of these sites and facilitate solar developers' selection of contaminated and disturbed sites for development.

  17. how much land | OpenEI Community

    Open Energy Info (EERE)

    how much land Home Sfomail's picture Submitted by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv land...

  18. csp land use | OpenEI Community

    Open Energy Info (EERE)

    csp land use Home Sfomail's picture Submitted by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv land...

  19. Bureau of Land Management - Land Use Planning Handbook | Open...

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - GuideHandbook: Bureau of Land Management - Land Use Planning HandbookPermittingRegulatory GuidanceGuideHandbook Abstract...

  20. Hawaii Land Study Bureau's Land Classification Finder | Open...

    Open Energy Info (EERE)

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Hawaii Land Study Bureau's Land Classification Finder Citation Hawaii State...

  1. Colorado State Land Board Land Survey Requirements | Open Energy...

    Open Energy Info (EERE)

    Colorado State Land Board Land Survey Requirements Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Colorado...

  2. Uni Land | Open Energy Information

    Open Energy Info (EERE)

    search Name: Uni Land Place: Bologna, Italy Zip: 40063 Sector: Solar Product: Italian property company, which buys land without permits and develops it for residential and...

  3. Land Use Baseline Report Savannah River Site

    SciTech Connect (OSTI)

    Noah, J.C.

    1995-06-29

    This document is to serve as a resource for Savannah River Site managers, planners, and SRS stakeholders by providing a general description of the site and land-use factors important to future use decisions and plans. The intent of this document is to be comprehensive in its review of SRS and the surrounding area.

  4. The Land | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Land April 12, 2016 Over the past nearly two years, there has been enormous activity, ... of its bid for CEBAF. In the following years, one portion of the campus was transferred ...

  5. CARBON SEQUESTRATION ON SURFACE MINE LANDS

    SciTech Connect (OSTI)

    Donald H. Graves; Christopher Barton; Richard Sweigard; Richard Warner

    2005-06-22

    An area planted in 2004 on Bent Mountain in Pike County was shifted to the Department of Energy project to centralize an area to become a demonstration site. An additional 98.3 acres were planted on Peabody lands in western Kentucky and Bent Mountain to bring the total area under study by this project to 556.5 acres as indicated in Table 2. Major efforts this quarter include the implementation of new plots that will examine the influence of differing geologic material on tree growth and survival, water quality and quantity and carbon sequestration. Normal monitoring and maintenance was conducted and additional instrumentation was installed to monitor the new areas planted.

  6. integrated-land-use

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    An Integrated Land Use and Transportation Planning Tool for Sydney, Australia Dr. Matthew Berryman, University of Wollongong Monday, November 28, 2011 - 1pm Argonne TRACC Building 222, Room D-233 The SMART Infrastructure Facility at the University of Wollongong, Australia, has been building an agent-based model to explore the feedbacks between transportation and land use. We focus on livability as a key driver of agent's location choice, and in addition to transport we include factors such

  7. Land Management - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Land Management About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Hanford Cultural Resources Contact Us Land Management Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Site - Hanford Reach The U.S. Department of Energy (DOE) Richland Operations Office (RL) is responsible for the management of Hanford Site property. RL has issued the Mission Support Contract (MSC) to provide direct support to RL, DOE Office River Protection (ORP)

  8. Proposed Conveyance of Land

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Conveyance of Land at the Hanford Site, Richland, WA Public Scoping Fact Sheet The U.S. Department of Energy (DOE) is seeking input for a National Environmental Policy Act (NEPA) Environmental Assessment (EA) to assess the potential environmental effects of conveying approximately 1,641 acres of Hanford Site land to a local economic development organization (https://federalregister.gov/a/2012-23099). The Tri-City Development Council (TRIDEC), a DOE-recognized Community Reuse Organization

  9. Geothermal resource area 9: Nye County. Area development plan

    SciTech Connect (OSTI)

    Pugsley, M.

    1981-01-01

    Geothermal Resource area 9 encompasses all of Nye County, Nevada. Within this area there are many different known geothermal sites ranging in temperature from 70/sup 0/ to over 265/sup 0/ F. Fifteen of the more major sites have been selected for evaluation in this Area Development Plan. Various potential uses of the energy found at each of the resource sites discussed in this Area Development Plan were determined after evaluating the area's physical characteristics, land ownership and land use patterns, existing population and projected growth rates, and transportation facilities, and comparing those with the site specific resource characteristics. The uses considered were divided into five main categories: electrical generation, space heating, recreation, industrial process heat, and agriculture. Within two of these categories certain subdivisions were considered separately. The findings about each of the 15 geothermal sites considered in this Area Development Plan are summarized.

  10. Economic consequences of land surface subsidence

    SciTech Connect (OSTI)

    Fowler, L.C.

    1981-06-01

    Overdraft in the Santa Clara Valley, Calif., groundwater basin caused land surface subsidence over an area of 63,000 ha with a maximum depression of 3.6 m from 1912-67. Since cessation of overdraft and replenishment of groundwater levels in 1969, there has been no significant land surface subsidence. During the period of active subsidence, water well casings buckled, sewers lost capacity as a result of changes in slope, and roads and railroads had to be raised. These damages are estimated at over $130 million. (1 graph, 1 map, 6 photos, 2 references, 1 table)

  11. Energy and land use

    SciTech Connect (OSTI)

    Not Available

    1981-12-01

    This report addresses the land use impacts of past and future energy development and summarizes the major federal and state legislation which influences the potential land use impacts of energy facilities and can thus influence the locations and timing of energy development. In addition, this report describes and presents the data which are used to measure, and in some cases, predict the potential conflicts between energy development and alternative uses of the nation's land resources. The topics section of this report is divided into three parts. The first part describes the myriad of federal, state and local legislation which have a direct or indirect impact upon the use of land for energy development. The second part addresses the potential land use impacts associated with the extraction, conversion and combustion of energy resources, as well as the disposal of wastes generated by these processes. The third part discusses the conflicts that might arise between agriculture and energy development as projected under a number of DOE mid-term (1990) energy supply and demand scenarios.

  12. Land-use Leakage

    SciTech Connect (OSTI)

    Calvin, Katherine V.; Edmonds, James A.; Clarke, Leon E.; Bond-Lamberty, Benjamin; Kim, Son H.; Wise, Marshall A.; Thomson, Allison M.; Kyle, G. Page

    2009-12-01

    Leakage occurs whenever actions to mitigate greenhouse gas emissions in one part of the world unleash countervailing forces elsewhere in the world so that reductions in global emissions are less than emissions mitigation in the mitigating region. While many researchers have examined the concept of industrial leakage, land-use policies can also result in leakage. We show that land-use leakage is potentially as large as or larger than industrial leakage. We identify two potential land-use leakage drivers, land-use policies and bioenergy. We distinguish between these two pathways and run numerical experiments for each. We also show that the land-use policy environment exerts a powerful influence on leakage and that under some policy designs leakage can be negative. International offsets are a potential mechanism to communicate emissions mitigation beyond the borders of emissions mitigating regions, but in a stabilization regime designed to limit radiative forcing to 3.7 2/m2, this also implies greater emissions mitigation commitments on the part of mitigating regions.

  13. land requirements | OpenEI Community

    Open Energy Info (EERE)

    land requirements Home Sfomail's picture Submitted by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv...

  14. Land use and energy

    SciTech Connect (OSTI)

    Robeck, K.E.; Ballou, S.W.; South, D.W.; Davis, M.J.; Chiu, S.Y.; Baker, J.E.; Dauzvardis, P.A.; Garvey, D.B.; Torpy, M.F.

    1980-07-01

    This report provides estimates of the amount of land required by past and future energy development in the United States and examines major federal legislation that regulates the impact of energy facilities on land use. An example of one land use issue associated with energy development - the potential conflict between surface mining and agriculture - is illustrated by describing the actual and projected changes in land use caused by coal mining in western Indiana. Energy activities addressed in the report include extraction of coal, oil, natural gas, uranium, oil shale, and geothermal steam; uranium processing; preparation of synfuels from coal; oil refineries; fossil-fuel, nuclear, and hydro-electric power plants; biomass energy farms; and disposal of solid wastes generated during combustion of fossil fuels. Approximately 1.1 to 3.3 x 10/sup 6/ acres were devoted to these activities in the United States in 1975. As much as 1.8 to 2.0 x 10/sup 6/ additional acres could be required by 1990 for new, nonbiomass energy development. The production of grain for fuel ethanol could require an additional 16.9 to 55.7 x 10/sup 6/ acres by 1990. Federal laws that directly or indirectly regulate the land-use impacts of energy facilities include the National Environmental Protection Act, Clean Air Act, Federal Water Pollution Control Act, Surface Mining Control and Reclamation Act, and Coastal Zone Management Act. The major provisions of these acts, other relevant federal regulations, and similar state and local regulatons are described in this report. Federal legislation relating to air quality, water quality, and the management of public lands has the greatest potential to influence the location and timing of future energy development in the United States.

  15. : H. Jack Elackwell, Area Manager, LAAO DATE:

    Office of Legacy Management (LM)

    O.&E b.&AORANDti~ l > : H. Jack Elackwell, Area Manager, LAAO DATE: June 5, 1973 70~ : ~$?$Z~H-Division Leader ,WE~,T : ENVIRONMENTAL RADIOACTIVITY SURVEY OF LOS ALAMOS COMIMUNITY LAND AREAS ' MBOL : H8M-73-102 At your request an environmental radioactivity survey of four' .tracts of AEC-owned land in Los Alamos County was conducted. The monitoring and analysis of samples paralleled that described in Los Alamos Scientific Laboratory Report LA5097-MS, "Los Alamos Land Areas

  16. Ecological Principles and Guidelines for Managing the Use of Land

    SciTech Connect (OSTI)

    Dale, Virginia H; Brown, Sandra; Haeuber, R A; Hobbs, N T; Huntly, N; Naiman, R J; Riebsame, W E; Turner, M G; Valone, T J

    2014-01-01

    rules of thumb for incorporating ecological principles into land-use decision making. These guidelines suggest that land managers should: (1) examine impacts of local decisions in a regional context, (2) plan for long-term change and unexpected events, (3) preserve rare landscape elements and associated species, (4) avoid land uses that deplete natural resources, (5) retain large contiguous or connected areas that contain critical habitats, (6) minimize the intro- duction and spread of nonnative species, (7) avoid or compensate for the effects of development on ecological processes, and (8) implement land-use and management practices that are compatible with the natural potential of the area. Decision makers and citizens are encouraged to consider these guidelines and to include ecological per- spectives in choices on how land is used and managed. The guidelines suggest actions required to develop the science needed by land managers.

  17. Navajo-Hopi Land Commission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Power at the Paragon-Bisti Ranch DOE TEP Review, Golden, CO May 7, 2015   THE NAVAJO-HOPI LAND SETTLEMENT ACT  Navajo-Hopi Land Settlement Act passed 1974  Required relocation of Navajo and Hopi families living on land partitioned to other tribe.  Set aside lands for the benefit of relocates  Proceeds from RE development for Relocatee Project Background   Paragon-Bisti Ranch is selected lands :  Located in northwestern New Mexico.  22,000 acres of land

  18. Bureau of Land Management - Land Use Planning | Open Energy Informatio...

    Open Energy Info (EERE)

    Planning Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - Land Use Planning Abstract The BLM's Resource Management Plans...

  19. Arid Lands Ecology Facility management plan

    SciTech Connect (OSTI)

    None

    1993-02-01

    The Arid Lands Ecology (ALE) facility is a 312-sq-km tract of land that lies on the western side of the Hanford Site in southcentral Washington. The US Atomic Energy Commission officially set aside this land area in 1967 to preserve shrub-steppe habitat and vegetation. The ALE facility is managed by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) for ecological research and education purposes. In 1971, the ALE facility was designated the Rattlesnake Hills Research Natural Area (RNA) as a result of an interagency federal cooperative agreement, and remains the largest RNA in Washington. it is also one of the few remaining large tracts of shrub-steppe vegetation in the state retaining a predominant preeuropean settlement character. This management plan provides policy and implementation methods for management of the ALE facilities consistent with both US Department of Energy Headquarters and the Richland Field Office decision (US Congress 1977) to designate and manage ALE lands as an RNA and as a component of the DOE National Environmental Research Park System.

  20. 300 area TEDF permit compliance monitoring plan

    SciTech Connect (OSTI)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  1. California State Lands Commission | Open Energy Information

    Open Energy Info (EERE)

    Lands Commission Jump to: navigation, search Logo: California State Lands Commission Name: California State Lands Commission Abbreviation: CSLC Address: 100 Howe Ave., Suite 100...

  2. Texas General Land Office | Open Energy Information

    Open Energy Info (EERE)

    Land Office Jump to: navigation, search Logo: Texas General Land Office Name: Texas General Land Office Address: 1700 Congress Ave Place: Austin, Texas Zip: 78701 Website:...

  3. Research Areas

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Areas Our Vision National User Facilities Research Areas In Focus Global Solutions ⇒ Navigate Section Our Vision National User Facilities Research Areas In Focus Global Solutions Biosciences The Biosciences Area forges multidisciplinary teams to solve national challenges in energy, environment and health issues; and to advance the engineering of biological systems for sustainable manufacturing. Biosciences Area research is coordinated through three divisions and is enabled by Berkeley

  4. Waste Isolation Pilot Plant land management plan

    SciTech Connect (OSTI)

    1996-05-01

    On October 30, 1992, the WIPP Land Withdrawal Act became law. This Act transferred the responsibility for the management of the WIPP Land Withdrawal Area (WILWA) from the Secretary of the Interior to the Secretary of Energy. In accordance with sections 3(a)(1) and (3) of the Act, these lands {open_quotes}{hor_ellipsis}are withdrawn from all forms of entry, appropriation, and disposal under the public land laws{hor_ellipsis}{close_quotes}and are reserved for the use of the Secretary of Energy {open_quotes}{hor_ellipsis}for the construction, experimentation, operation, repair and maintenance, disposal, shutdown, monitoring, decommissioning, and other activities, associated with the purposes of WIPP as set forth in the Department of Energy National Security and Military Applications of Nuclear Energy Act of 1980 and this Act.{close_quotes}. As a complement to this LMP, a MOU has been executed between the DOE and the BLM, as required by section 4(d) of the Act. The state of New Mexico was consulted in the development of the MOU and the associated Statement of Work (SOW).

  5. Rich land Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TG Department of Energy Rich land Operations Office P.O. Box 550 AES Richland, Washington 99352 CERTIFIED MAIL NOV~ 2 10 2009 Mr. Gerald Pollet Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Mr. Pollet: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0054) The purpose of this letter is to inform you that we have withdrawn our response dated September 14, 2009, and have issued the following determination regarding item 8 of your request. In response to

  6. Reclamation planning for abandoned mining subsidence lands in eastern China --- A case study

    SciTech Connect (OSTI)

    Zhenqi Hu; Hehe Gu

    1995-09-01

    China has a long history of coal mining and more than 96% of coal output is taken from underground mines each year. With the excavation of coal from underground, severe subsidence often results, which produces many subsidence lands. Since the Chinese government enacted a reclamation stipulation in 1989, many abandoned mining subsidence lands were produced before 1989. Therefore, reclamation of abandoned subsidence lands has become the focus of research activities in our country. This paper explores the principle and methods of reclamation planning for abandoned mining subsidence lands and presents a case study in eastern China. A 373 ha of abandoned mining subsidence land in Anhui province was selected as an experiment site. Since China is a developing country and land shortage is severe in this area, the high economic benefits from the reclaimed land was the final reclamation goal. Based on the topography of subsidence lands --- some parts of the abandoned lands were wetland or lake-like troughs, restoring farmlands and fishponds were chosen as post-reclamation land uses. The elevation of reclaimed lands was the key for restoring farmland successfully because of the high underground water level in this area, and the optimum fishpond size and side-slope design were the keys to reach high reclamation income. The HDP (Hydraulic Dredge Pump) reclamation technique was used for restoring farmland and creating fishpond. A farming and aquaculture plan for high economic benefits was also designed. This project will make farmers, who own the lands, richer through reclamation.

  7. From land use to land cover: Restoring the afforestation signal...

    Office of Scientific and Technical Information (OSTI)

    ... Sponsoring Org: USDOE Country of Publication: United States Language: English Subject: 54 ENVIRONMENTAL SCIENCES earth system modeling; climate change; land use Word Cloud More ...

  8. Paddy field, groundwater and land subsidence

    SciTech Connect (OSTI)

    Wen, L.J.

    1995-12-31

    Through many years of research and technical interchange both at home and abroad, it is commonly recognized that paddy fields possess the functions of micro-climate adjustment, flood detection and prevention, soil and water conservation, river-flow stabilization, soil salinization prevention, water purification, groundwater recharge, rural area beautification and environmental protection which are all beneficial to the public. In recent years, the global environmental problems have become a series concern throughout the world. These include the broken ozone layer, green house effects, acid rain, land desertion, tropical rain forest disappearing etc. Among them, rain forest disappearing draws great attention. Both rain forests and paddy fields are in tropical areas. They have similar functions and are disappearing because of economic pressure. This paper describes the special functions of paddy fields on water purification, ground water recharge and prevention of land subsidence, and reiterates groundwater utilization and land subsidence prevention measures. In view of the importance of groundwater resources, paddy fields, which can not be replaced by any other artificial groundwater recharge facilities, should not be reduced in acreage, nor can they be left idle. Paddy fields shall be properly maintained and managed in order to strengthen their special functions in the years to come even under heavy pressure from foreign countries.

  9. Big Windy (Great Escape Restaurant Turbine) | Open Energy Information

    Open Energy Info (EERE)

    :"","icon":"","group":"","inlineLabel":"","visitedicon":"" References "Wind Energy Data and Information Gateway (WENDI)" Retrieved from "http:en.openei.orgw...

  10. EIS-0370: Windy Gap Firming Project, Colorado | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    a cooperating agency, evaluates the environmental impacts of a proposal to construct new water storage reservoir capacity southwest of Loveland, Colorado. Western has jurisdiction...

  11. Land Energy | Open Energy Information

    Open Energy Info (EERE)

    Energy Jump to: navigation, search Name: Land Energy Place: North Yorkshire, United Kingdom Zip: YO62 5DQ Sector: Biomass, Renewable Energy Product: A renewable-energy company...

  12. Research Areas

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in diverse research areas such as cell biology, lithography, infrared microscopy, radiology, and x-ray tomography. Time-Resolved These techniques exploit the pulsed nature of...

  13. Bay Area

    National Nuclear Security Administration (NNSA)

    8%2A en NNSA to Conduct Aerial Radiological Surveys Over San Francisco, Pacifica, Berkeley, And Oakland, CA Areas http:nnsa.energy.govmediaroompressreleasesamsca

  14. Land reclamation beautifies coal mines

    SciTech Connect (OSTI)

    Coblentz, B.

    2009-07-15

    The article explains how the Mississippi Agricultural and Forestry Experiments station, MAFES, has helped prepare land exploited by strip mining at North American Coal Corporation's Red Hills Mine. The 5,800 acre lignite mine is over 200 ft deep and uncovers six layers of coal. About 100 acres of land a year is mined and reclaimed, mostly as pine plantations. 5 photos.

  15. Land-Based Wind Potential Changes in the Southeastern United States (Presentation)

    SciTech Connect (OSTI)

    Roberts, J. O.

    2013-09-01

    Recent advancements in utility-scale wind turbine technology and pricing have vastly increased the potential land area where turbines can be deployed in the United States. This presentation quantifies the new developable land potential (e.g., capacity curves), visually identifies new areas for possible development (e.g., new wind resource maps), and begins to address deployment barriers to wind in new areas for modern and future turbine technology.

  16. File:03CAAStateLandLeasingProcessAndLandAccessROWs.pdf | Open...

    Open Energy Info (EERE)

    03CAAStateLandLeasingProcessAndLandAccessROWs.pdf Jump to: navigation, search File File history File usage Metadata File:03CAAStateLandLeasingProcessAndLandAccessROWs.pdf Size of...

  17. File:03-CO-b - ROW Process for State Land Board Land.pdf | Open...

    Open Energy Info (EERE)

    CO-b - ROW Process for State Land Board Land.pdf Jump to: navigation, search File File history File usage Metadata File:03-CO-b - ROW Process for State Land Board Land.pdf Size of...

  18. File:03-TX-f - Lease of Land Trade Lands.pdf | Open Energy Information

    Open Energy Info (EERE)

    TX-f - Lease of Land Trade Lands.pdf Jump to: navigation, search File File history File usage Metadata File:03-TX-f - Lease of Land Trade Lands.pdf Size of this preview: 463 599...

  19. Montana State Land Board | Open Energy Information

    Open Energy Info (EERE)

    Land Board Jump to: navigation, search Name: Montana State Land Board Place: Helena, Montana Website: dnrc.mt.govLandBoardStaff.as References: Webpage1 This article is a stub....

  20. AG Land 5 | Open Energy Information

    Open Energy Info (EERE)

    5 Jump to: navigation, search Name AG Land 5 Facility AG Land 5 Sector Wind energy Facility Type Community Wind Facility Status In Service Owner AG Land Energy LLC Developer...

  1. Geothermal/Land Use | Open Energy Information

    Open Energy Info (EERE)

    GeothermalLand Use < Geothermal(Redirected from Land Use) Redirect page Jump to: navigation, search REDIRECT GeothermalLand Use Planning Retrieved from "http:en.openei.orgw...

  2. LDK Uni Land JV | Open Energy Information

    Open Energy Info (EERE)

    Uni Land JV Jump to: navigation, search Name: LDK & Uni Land JV Place: Italy Product: Italy-based JV to develop and construct PV projects. References: LDK & Uni Land JV1 This...

  3. Colorado State Board of Land Commissioners Strategic Plan | Open...

    Open Energy Info (EERE)

    Reference LibraryAdd to library Land Use Plan: Colorado State Board of Land Commissioners Strategic Plan Abstract The Colorado State Board of Land Commissioners (State Land Board)...

  4. EA-365 Centre Land Trading Limited | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Centre Land Trading Limited EA-365 Centre Land Trading Limited Order Authorizing Centre Land Trading Limited to export electric energy to Canada EA-365 Centre Land Trading Limited ...

  5. Quantitative Analysis of Biofuel Sustainability, Including Land...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quantitative Analysis of Biofuel Sustainability, Including Land Use Change GHG Emissions Quantitative Analysis of Biofuel Sustainability, Including Land Use Change GHG Emissions ...

  6. Arizona State Land Department | Open Energy Information

    Open Energy Info (EERE)

    Department Jump to: navigation, search Logo: Arizona State Land Department Name: Arizona State Land Department Abbreviation: ASLD Address: 1616 W. Adams St. Place: Phoenix, AZ Zip:...

  7. State Land Commission FAQ | Open Energy Information

    Open Energy Info (EERE)

    Land Commission FAQ Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: State Land Commission FAQ Abstract Frequently Asked Questions, California State...

  8. Ewing Land Development Services | Open Energy Information

    Open Energy Info (EERE)

    Ewing Land Development Services Jump to: navigation, search Name: Ewing Land Development & Services Place: Pella, Iowa Zip: 50219 Product: Real estate development company...

  9. Elektra Basel Land EBL | Open Energy Information

    Open Energy Info (EERE)

    Basel Land EBL Jump to: navigation, search Name: Elektra Basel Land (EBL) Place: Liestal, Switzerland Zip: 4410 Product: Swiss utility with a possible investment interest in...

  10. Defense, Interior Departments Pursue Renewable Energy on Federal Lands

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Interior Department announced on August 6 that Secretary of Defense Leon Panetta and Secretary of the Interior Ken Salazar have signed a Memorandum of Understanding (MOU) that encourages appropriate development of renewable energy projects on public lands that are set aside for defense-related purposes, and on other onshore and offshore areas near military installations.

  11. Energy Corridors on Federal Lands

    Office of Energy Efficiency and Renewable Energy (EERE)

    To improve energy delivery and enhance the electric transmission grid for the future, several government agencies currently are working together to establish a coordinated network of Federal energy corridors on Federal lands throughout the United States.

  12. Land and Facility Use Planning

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-07-09

    The Land and Facility Use Planning process provides a way to guide future site development and reuse based on the shared long-term goals and objectives of the Department, site and its stakeholders. Does not cancel other directives.

  13. Tribal Lands Student Internship Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lands Student Internship Program Sandia National Laboratories National Renewable Energy Laboratories Department of Energy The Navajo Tribal Utility Authority 2003 Tribal Lands Program Interns * Shaun Tsabetsaye - Zuni - University of New Mexico - Electrical Engineering * Velissa Sandoval - Navajo/Zuni - University of Denver - Electrical Engineering * Keith Candelaria - Jemez/San Felipe - Dartmouth College - Environmental/Earth Science Several research methods used to understanding NTUA's O&M

  14. EVALUATION OF LAND USE/LAND COVER DATASETS FOR URBAN WATERSHED MODELING

    SciTech Connect (OSTI)

    S.J. BURIAN; M.J. BROWN; T.N. MCPHERSON

    2001-08-01

    Land use/land cover (LULC) data are a vital component for nonpoint source pollution modeling. Most watershed hydrology and pollutant loading models use, in some capacity, LULC information to generate runoff and pollutant loading estimates. Simple equation methods predict runoff and pollutant loads using runoff coefficients or pollutant export coefficients that are often correlated to LULC type. Complex models use input variables and parameters to represent watershed characteristics and pollutant buildup and washoff rates as a function of LULC type. Whether using simple or complex models an accurate LULC dataset with an appropriate spatial resolution and level of detail is paramount for reliable predictions. The study presented in this paper compared and evaluated several LULC dataset sources for application in urban environmental modeling. The commonly used USGS LULC datasets have coarser spatial resolution and lower levels of classification than other LULC datasets. In addition, the USGS datasets do not accurately represent the land use in areas that have undergone significant land use change during the past two decades. We performed a watershed modeling analysis of three urban catchments in Los Angeles, California, USA to investigate the relative difference in average annual runoff volumes and total suspended solids (TSS) loads when using the USGS LULC dataset versus using a more detailed and current LULC dataset. When the two LULC datasets were aggregated to the same land use categories, the relative differences in predicted average annual runoff volumes and TSS loads from the three catchments were 8 to 14% and 13 to 40%, respectively. The relative differences did not have a predictable relationship with catchment size.

  15. Reinterpreting SMCRA: {open_quotes}Permitting{close_quotes} phased postmining land use

    SciTech Connect (OSTI)

    Merkin, Z.R.; Nieman, T.J.

    1996-12-31

    The coal producing area of Appalachian Kentucky has a shortage of developable land. The majority of mined land in this region has been reclaimed to pastureland or hayland, while narrow interpretation of the Surface Mining Control and Reclamation Act of 1977 (SMCRA) and regulations, especially regarding bond release, has limited alternative postmining land uses which could support economic development. A study of Federal and State of Kentucky laws and regulations shows that postmining land use regulations and their implementation have focussed on preventing and minimizing environmental damage. Land use and land use planning concepts are not well understood, thus permit applications inadequately address land use needs and the {open_quotes}highest and best use{close_quotes} of a site. Required information about pre-mining conditions is not collected and analyzed in a way useful for determining appropriate postmining land use. More comprehensive, higher quality land use information, with information about regional factors such as transportation, utilities, labor market, etc., should be included in the permit application to identify sites with strong development potential. This, combined with a broader interpretation of the law recognizing the validity of a phased implementation of postmined land use, would continue environmental protection while preparing reclaimed land to meet potential future land use needs. The mining plan can be designed so that appropriate areas are prepared and laid out for future buildings or roads, yet are conducive to interim use for pasture, wildlife or recreation. Reclamation to the interim use, sufficient to protect the public and allow bond release, maintains the potential for later development. Land later can be made available in response to development demands, contributing to a more diversified economy.

  16. Single-Well and Cross-Well Seismic At Salt Wells Area (Bureau...

    Open Energy Info (EERE)

    Seismic At Salt Wells Area (Bureau of Land Management, 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Single-Well and Cross-Well Seismic...

  17. PERCENT FEDERAL LAND FOR OIL/GAS FIELD OUTLINES

    U.S. Energy Information Administration (EIA) Indexed Site

    PERCENT FEDERAL LAND FOR OIL/GAS FIELD OUTLINES The VBA code below calculates the area percent of a first polygon layer (e.g. oil/gas field outlines) that are within a second polygon layer (e.g. federal land) and writes out the fraction as an attribute for the first polygon layer. If you make buffered well field outline polygons using the VBA code in BUFFERED_WELL_FIELD_OUTLINES.doc, you will have a feature class with the attribute PCTFEDLAND to use as the first polygon layer. If not, add the

  18. Land-Use Requirements for Solar Power Plants in the United States

    SciTech Connect (OSTI)

    Ong, S.; Campbell, C.; Denholm, P.; Margolis, R.; Heath, G.

    2013-06-01

    This report provides data and analysis of the land use associated with utility-scale ground-mounted solar facilities, defined as installations greater than 1 MW. We begin by discussing standard land-use metrics as established in the life-cycle assessment literature and then discuss their applicability to solar power plants. We present total and direct land-use results for various solar technologies and system configurations, on both a capacity and an electricity-generation basis. The total area corresponds to all land enclosed by the site boundary. The direct area comprises land directly occupied by solar arrays, access roads, substations, service buildings, and other infrastructure. As of the third quarter of 2012, the solar projects we analyze represent 72% of installed and under-construction utility-scale PV and CSP capacity in the United States.

  19. EIS-0400: Record of Decision | Department of Energy

    Energy Savers [EERE]

    EIS-0400: Record of Decision Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Western Area Power Administration prepared an ...

  20. EIS-0400: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    EIS-0400: Final Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Western Area Power ...

  1. Geothermal resource area 11, Clark County area development plan

    SciTech Connect (OSTI)

    Pugsley, M.

    1981-01-01

    Geothermal Resource Area 11 includes all of the land in Clark County, Nevada. Within this area are nine geothermal anomalies: Moapa Area, Las Vegas Valley, Black Canyon, Virgin River Narrows, Roger's Springs, Indian Springs, White Rock Springs, Brown's Spring, and Ash Creek Spring. All of the geothermal resources in Clark County have relatively low temperatures. The highest recorded temperature is 145{sup 0}F at Black Canyon. The temperatures of the other resources range from 70 to 90{sup 0}F. Because of the low temperature of the resources and, for the most part, the distance of the resources from any population base, the potential for the development of the resources are considered to be somewhat limited.

  2. Application of satellite and GIS technologies for land-cover and land-use mapping at the rural-urban fringe - A case study

    SciTech Connect (OSTI)

    Treitz, P.M.; Howarth, P.J.; Gong, Peng )

    1992-04-01

    SPOT HRV multispectral and panchromatic data were recorded and coregistered for a portion of the rural-urban fringe of Toronto, Canada. A two-stage digital analysis algorithm incorporating a spectral-class frequency-based contextual classification of eight land-cover and land-use classes resulted in an overall Kappa coefficient of 82.2 percent for training-area data and a Kappa coefficient of 70.3 percent for test-area data. A matrix-overlay analysis was then performed within the geographic information system (GIS) to combine the land-cover and land-use classes generated from the SPOT digital classification with zoning information for the area. The map that was produced has an estimated interpretation accuracy of 78 percent. Global Positioning System (GPS) data provided a positional reference for new road networks. These networks, in addition to the new land-cover and land-use map derived from the SPOT HRV data, provide an up-to-date synthesis of change conditions in the area. 51 refs.

  3. DOE - Office of Legacy Management -- LASL Land Parcels A B C E K LN PL - NM

    Office of Legacy Management (LM)

    07 Land Parcels A B C E K LN PL - NM 07 Site ID (CSD Index Number): NM.09 Site Name: LOS ALAMOS LAND PARCELS A B C E K L N PIPELINE (NM.07) / LASL PIPELINE FACILITY (NM.08) / LASL TRACTS EASTERN AREA L Site Summary: These land parcels, previously owned by the federal government, were sold in 1972. The pipeline facility and eastern area L were identified separately in some documents and assigned individual numbers by FUSRAP researchers, but these parcels were included in NM.07. Site Link:

  4. Central Facilities Area Sewage Lagoon Evaluation

    SciTech Connect (OSTI)

    Mark R. Cole

    2013-12-01

    The Central Facilities Area (CFA), located in Butte County, Idaho, at the Idaho National Laboratory has an existing wastewater system to collect and treat sanitary wastewater and non-contact cooling water from the facility. The existing treatment facility consists of three cells: Cell #1 has a surface area of 1.7 acres, Cell #2 has a surface area of 10.3 acres, and Cell #3 has a surface area of 0.5 acres. If flows exceed the evaporative capacity of the cells, wastewater is discharged to a 73.5-acre land application site that uses a center-pivot irrigation sprinkler system. As flows at CFA have decreased in recent years, the amount of wastewater discharged to the land application site has decreased from 13.64 million gallons in 2004 to no discharge in 2012 and 2013. In addition to the decreasing need for land application, approximately 7.7 MG of supplemental water was added to the system in 2013 to maintain a water level and prevent the clay soil liners in the cells from drying out and “cracking.” The Idaho National Laboratory is concerned that the sewage lagoons and land application site may be oversized for current and future flows. A further concern is the sustainability of the large volumes of supplemental water that are added to the system according to current operational practices. Therefore, this study was initiated to evaluate the system capacity, operational practices, and potential improvement alternatives, as warranted.

  5. Bureau of Land Management - Table 1.4-1 - Land Use Planning Process...

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - Instructions: Bureau of Land Management - Table 1.4-1 - Land Use Planning Process StepsPermittingRegulatory...

  6. New Technologies to Reclaim Arid Lands User's Manual

    SciTech Connect (OSTI)

    W. K. Ostler

    2002-10-01

    Approximately 70 percent of all U.S. military training lands are located in arid and semi-arid areas. Training activities in such areas frequently adversely affect vegetation, damaging plants and reducing the resilience of vegetation to recover once disturbed. Fugitive dust resulting from a loss of vegetation creates additional problems for human health, increasing accidents due to decreased visibility, and increasing maintenance costs for roads, vehicles, and equipment. Under conventional technologies to mitigate these impacts, it is estimated that up to 35 percent of revegetation projects in arid areas will fail due to unpredictable natural environmental conditions, such as drought, and reclamation techniques that were inadequate to restore vegetative cover in a timely and cost-effective manner. New reclamation and restoration techniques are needed in desert ranges to help mitigate the adverse effects of military training and other activities to arid-land environments. In 1999, a cooperative effort between the U.S. Department of Energy (DOE), the US. Department of Defense (DoD), and selected university scientists was undertaken to focus on mitigating military impacts in arid lands. As arid lands are impacted due to DoD and DOE activities, biological and soil resources are gradually lost and the habitat is altered. A conceptual model of that change in habitat quality is described for varying levels of disturbance in the Mojave Desert. As the habitat quality degrades and more biological and physical resources are lost from training areas, greater costs are required to return the land to sustainable levels. The purpose of this manual is to assist land managers in recognizing thresholds associated with habitat degradation and provide reclamation planning and techniques that can reduce the costs of mitigation for these impacted lands to ensure sustainable use of these lands. The importance of reclamation planning is described in this manual with suggestions about

  7. Career Map: Land Acquisition Specialist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Land Acquisition Specialist Career Map: Land Acquisition Specialist a male land acquisition specialist takes notes while surveying a piece of land. Land Acquisition Specialist Position Title Land Acquisition Specialist Alternate Title(s) Land Agent, Land Acquisition Associate Education & Training Level Bachelor degree required, prefer graduate degree Education & Training Level Description Land acquisition specialists are expected to have a bachelor's degree or higher in business, real

  8. Solar Land Use | Open Energy Information

    Open Energy Info (EERE)

    Solar Land Use Jump to: navigation, search (The following text is derived from a National Renewable Energy Laboratory report on solar land use in the United States.)1 One concern...

  9. Land Use Planning Handbook | Open Energy Information

    Open Energy Info (EERE)

    Handbook H-1601-1 released by the United States Department of the Interior Bureau of Land Management (BLM). "This Handbook provides supplemental guidance to the Bureau of Land...

  10. Remining to reclaim abandoned mined lands: Virginia`s initiative

    SciTech Connect (OSTI)

    Zipper, C.E.; Lambert, B.

    1998-12-31

    Abandoned Mined Lands (AML) are lands that were mined prior to implementation of the federal Surface Mining Control and Reclamation Act (SMCRA) in 1977, but were inadequately reclaimed. Re-mining of AML is being conducted on a routine basis by coal-mining operations in eastern states such as Virginia. Re-mining is a potentially important means of reclaiming AML. However, under current policies, re-mining operations often fail to permit and reclaim priority 1, 2, and 3 AML, especially those areas which present the most severe environmental problems. This paper describes policy issues which affect the potential for AML reclamation by re-mining operations in mountainous mining areas, such as Virginia; efforts underway in Virginia which seek to resolve those issues; and progress achieved to date under that initiative.

  11. Marine One Landing Exercise at Argonne

    SciTech Connect (OSTI)

    2013-03-20

    Marine One and its support helicopters conduct a landing exercise at Argonne prior to the President's visit.

  12. Assessing land take by urban development and its impact on carbon storage: Findings from two case studies in Italy

    SciTech Connect (OSTI)

    Sallustio, L.; Quatrini, V.; Geneletti, D.; Corona, P.; Marchetti, M.

    2015-09-15

    Highlights: • We tested a new methodology for monitoring land take and its effects on C storage. • The ecological impact of urban growth derives from the previous land use. • C loss increases with the naturalness of the territory. • Different urban assets may imply different forms of land take containment. Land take due to urbanization triggers a series of negative environmental impacts with direct effects on quality of life for people living in cities. Changes in ecosystem services are associated with land take, among which is the immediate C loss due to land use conversion. Land use change monitoring represents the first step in quantifying land take and its drivers and impacts. To this end, we propose an innovative methodology for monitoring land take and its effects on ecosystem services (in particular, C loss) under multi-scale contexts. The devised approach was tested in two areas with similar sizes, but different land take levels during the time-span 1990–2008 in Central Italy (the Province of Rome and the Molise Region). The estimates of total coverage of built up areas were calculated using point sampling. The area of the urban patches including each sampling point classified as built up areas in the year 1990 and/or in the year 2008 is used to estimate total abundance and average area of built up areas. Biophysical and economic values for carbon loss associated with land take were calculated using InVEST. Although land take was 7–8 times higher in the Province of Rome (from 15.1% in 1990 to 20.4% in 2008) than in Molise region, our findings show that its relative impact on C storage is higher in the latter, where the urban growth consistently affects not only croplands but also semi-natural land uses such as grasslands and other wooded lands. The total C loss due to land take has been estimated in 1.6 million Mg C, corresponding to almost 355 million €. Finally, the paper discusses the main characteristics of urban growth and their

  13. Solar Energy on Public Lands | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Public Lands Solar Energy on Public Lands This website describes federal policy for deploying utility scale solar on public lands. It includes a roadmap for deployment, a ...

  14. RCW 79.13 Land Leases | Open Energy Information

    Open Energy Info (EERE)

    RCW 79.13 Land LeasesLegal Abstract Washington statute governing the administration of land leases for state trust lands. Published NA Year Signed or Took Effect...

  15. Fundamental to the Cloud Land Surface Interaction Campaign (CLASIC...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in agriculture ranging from more accurate weather forecasting to improved water management decisions and crop yield estimation. CLASIC CLASIC - - LAND LAND Cloud and Land...

  16. Hawaii State Land Use Commission | Open Energy Information

    Open Energy Info (EERE)

    Hawaii State Land Use Commission Jump to: navigation, search Name: State Land Use Commission Abbreviation: LUC Place: Honolulu, Hawaii References: State Land Use Commission -...

  17. Mined Land Reclamation on DOE's Uranium Lease Tracts, Southwestern...

    Office of Environmental Management (EM)

    Mined Land Reclamation on DOE's Uranium Lease Tracts, Southwestern Colorado Mined Land Reclamation on DOE's Uranium Lease Tracts, Southwestern Colorado Mined Land Reclamation on...

  18. Geothermal/Land Use Planning | Open Energy Information

    Open Energy Info (EERE)

    Land Use Planning < Geothermal(Redirected from GeothermalLand Use) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Planning Leasing Exploration Well Field...

  19. Lands with Wilderness Characteristics, Resource Management Plan Constraints, and Land Exchanges: Cross-Jurisdictional Management and Impacts on Unconventional Fuel Development in Utah's Uinta Basin

    SciTech Connect (OSTI)

    Keiter, Robert; Ruple, John; Holt, Rebecca; Tanana, Heather; McNeally, Phoebe; Tribby, Clavin

    2012-10-01

    Secretarial Order 3310, Protecting Wilderness Characteristics on Lands Managed by the Bureau of Land Management. Supporters argue that the Order merely provides guidance regarding implementation of existing legal obligations without creating new rights or duties. Opponents describe Order 3310 as subverting congressional authority to designate Wilderness Areas and as closing millions of acres of public lands to energy development and commodity production. While opponents succeeded in temporarily defunding the Order’s implementation and forcing the Bureau of Land Management (BLM) to adopt a more collaborative approach, the fundamental questions remain: Which federal public lands possess wilderness characteristics and how should those lands be managed? The closely related question is: How might management of such resources impact unconventional fuel development within Utah? These questions remain pressing independent of the Order because the BLM, which manages the majority of federal land in Utah, is statutorily obligated to maintain an up-to-date inventory of federal public lands and the resources they contain, including lands with wilderness characteristics. The BLM is also legally obligated to develop and periodically update land use plans, relying on information obtained in its public lands inventory. The BLM cannot sidestep these hard choices, and failure to consider wilderness characteristics during the planning process will derail the planning effort. Based on an analysis of the most recent inventory data, lands with wilderness characteristics — whether already subject to mandatory protection under the Wilderness Act, subject to discretionary protections as part of BLM Resource Management Plan revisions, or potentially subject to new protections under Order 3310 — are unlikely to profoundly impact oil shale development within Utah’s Uinta Basin. Lands with wilderness characteristics are likely to v have a greater impact on oil sands resources, particularly those

  20. Land-Use Change and Bioenergy

    SciTech Connect (OSTI)

    2011-07-01

    This publication describes the Biomass Program’s efforts to examine the intersection of land-use change and bioenergy production. It describes legislation requiring land-use change assessments, key data and modeling challenges, and the research needs to better assess and understand the impact of bioenergy policy on land-use decisions.

  1. Restoration of surface-mined lands with rainfall harvesting

    SciTech Connect (OSTI)

    Sauer, R.H.; Rickard, W.H.

    1982-12-01

    Strip mining for coal in the arid western US will remove grazing land as energy demands are met. Conventional resotration usually includes leveling the spoil banks and covering them with top soil, fertilizing, seeding and irrigation with well or river water. An overview of research on an alternate method of restoring this land is reported. From 1976 through 1981 studies were conducted on the use of water harvesting, the collection and use of rainfall runoff, to restore the vegetative productivity of strip mined lands in arid regions. These studies tested the technical and economic feasibility of using partially leveled spoil banks at strip mines as catchment areas to collect and direct runoff to the topsoiled valley floor where crops were cultivated. Information was collected on the efficiency of seven treatments to increase runoff from the catchment areas and on the productivity of seven crops. The experiments were conducted in arid areas of Washington, Arizona, and Colorado. It was concluded that water harvesting can replace or augment expensive and inadequate supplies of well and river water in arid regions with a suitable climate. These studies showed that some treatments provided adequate runoff to produce a useful crop in the valleys, thus making this alternative approach to restoration technically feasible. This approach was also potentially economically feasible where the treatment costs of the catchment areas were low, the treatment was effective, the crop was productive and valuable, and earthmoving costs were lower than with conventional restoration involving complete leveling of spoil banks. It was also concluded that water harvesting can be made more effective with further information on catchment area treatments, which crops are most adaptable to water harvesting, the optimum incline of the catchment areas and climatic influences on water harvesting.

  2. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    N /A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  3. Webtrends Archives by Fiscal Year - Topic Landing Pages | Department...

    Broader source: Energy.gov (indexed) [DOE]

    topic landing pages by fiscal year. Topic Landing Pages FY10 (2.04 MB) Topic Landing Pages FY11 (2.02 MB) Topic Landing Pages FY12-FY13 (366.66 KB) More Documents & Publications ...

  4. Livestock impacts for management of reclaimed land at Navajo Mine: Vegetation responses

    SciTech Connect (OSTI)

    Wood, M.K.; Buchanan, B.A.; Estrada, O.

    1997-12-31

    The post-mining land use for Navajo Mine, a large surface coal mine in northwest New Mexico, is livestock grazing. Reclamation began in the early 1970`s and has been primarily directed toward the development of a grassland with shrubs. However, none of these lands were grazed before 1994 and none have been released back to the Navajo Nation. Therefore, it is not known how these reclaimed lands will respond to livestock impacts once the lands are released. Livestock impacts include grazing, trampling, and adding feces and urine. Cattle impacts were applied in 1994 to a land that had been reclaimed in 1978, 1991 and 1992. Vegetation monitoring procedures were implemented to detect and document successful and unsuccessful impact practices for both impacted areas and areas excluded from cattle. After three impact seasons, there were similar levels of perennial plant cover, production, and density on impacted lands compared to excluded lands. Based on age structure analysis, there is a trend that establishment of seedlings is stimulated by cattle. Cattle also decrease the amount of previous years` growth of standing phytomass with a trend to stimulate new growth. It is possible that some of the previous year`s growth was reduced by cattle trampling as much as by grazing because cattle generally prefer to eat the current year`s growth before it cures. No differences in number of seedheads per plant, animal sign, plant pedestals, and soil rills could be detected after three seasons of impacting.

  5. Wind Development on Tribal Lands

    SciTech Connect (OSTI)

    Ken Haukaas; Dale Osborn; Belvin Pete

    2008-01-18

    Background: The Rosebud Sioux Tribe (RST) is located in south central South Dakota near the Nebraska border. The nearest community of size is Valentine, Nebraska. The RST is a recipient of several Department of Energy grants, written by Distributed Generation Systems, Inc. (Disgen), for the purposes of assessing the feasibility of its wind resource and subsequently to fund the development of the project. Disgen, as the contracting entity to the RST for this project, has completed all the pre-construction activities, with the exception of the power purchase agreement and interconnection agreement, to commence financing and construction of the project. The focus of this financing is to maximize the economic benefits to the RST while achieving commercially reasonable rates of return and fees for the other parties involved. Each of the development activities required and its status is discussed below. Land Resource: The Owl Feather War Bonnet 30 MW Wind Project is located on RST Tribal Trust Land of approximately 680 acres adjacent to the community of St. Francis, South Dakota. The RST Tribal Council has voted on several occasions for the development of this land for wind energy purposes, as has the District of St. Francis. Actual footprint of wind farm will be approx. 50 acres. Wind Resource Assessment: The wind data has been collected from the site since May 1, 2001 and continues to be collected and analyzed. The latest projections indicate a net capacity factor of 42% at a hub height of 80 meters. The data has been collected utilizing an NRG 9300 Data logger System with instrumentation installed at 30, 40 and 65 meters on an existing KINI radio tower. The long-term annual average wind speed at 65-meters above ground level is 18.2 mph (8.1 mps) and 18.7 mph (8.4 mps) at 80-meters agl. The wind resource is excellent and supports project financing.

  6. Wind Power Siting: Public Acceptance and Land Use; NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Tegen, Suzanne

    2015-06-17

    Suzanne Tegen presented this information as part of the June 17, 2015 WINDExchange webinar: Overcoming Wind Siting Challenges III: Public Acceptance and Land Use. This presentation provides an overview of current NREL research related to wind energy deployment considerations, the DOE Wind Vision as it relates to public acceptance and land use, why public acceptance of wind power matters, where the U.S. wind resource is best, and how those rich resource areas overlay with population centers.

  7. Sales of Fossil Fuels Produced from Federal and Indian Lands, FY 2003 through FY 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Table 3. Sales of crude oil and lease condensate production from federal and Indian lands, FY 2003-14 million barrels Notes: Totals may not equal sum of components because of independent rounding. Onshore federal excludes volumes on Indian lands. Offshore federal only includes areas in federal waters. Source: U.S. Energy Information Administration based on U.S. Department of the Interior, Office of Natural Resources Revenue. "ONNR Statistical Information Site"

  8. Using the National Environmental Policy Act to facilitate the transfer of federal lands for economic development

    SciTech Connect (OSTI)

    Ladino, A.G.

    1997-06-01

    In order to evaluate the transfer of certain Federal lands at Los Alamos National Laboratory (LANL), the US Department of Energy (DOE) determined that the proposed action had the potential to result in environmental impacts and required the preparation of an Environmental Assessment under the National Environmental Policy Act (NEPA). The specific proposed action evaluated by DOE with support from LANL was the transfer of approximately 28 contiguous acres of underutilized Federal land to the County. This tract was locally referred to as the DP Road tract. Although the land was underutilized, it functioned as part of a larger buffer area between potentially hazardous operations at LANL and the general public. The tract was covered with scrub vegetation. There were no government buildings located on the site. The tract of land had two Resource Conservation and Recovery Act (RCRA) Solid Waste Management Units (SWMUs) located within the tract boundary as well as a buried but active liquid radioactive waste pipeline that crossed the site. The tract of land was adjacent to several other DOE SWMUs as well as a public road. In addition, there were ownership issues pertaining to the transfer of the land to persons and agencies other than the County. This particular tract of land was being considered for transfer to the County at the same time DOE and LANL began evaluating another large Federal land tract for lease to the County to be developed as a private research park.

  9. Surface and groundwater management in surface mined-land reclamation

    SciTech Connect (OSTI)

    Evoy, B.; Holland, M.

    1990-06-01

    This report provides information on surface water and groundwater management for use in the mined-land reclamation planning process in California. Mined-land reclamation, as defined by the California Surface Mining and Reclamation Act, is the combination of land treatments which prevent or minimize water degradation, air pollution, damage to aquatic or wildlife habitat, and erosion resulting from a surface mining operation. Surface water and groundwater management play an integral role in nearly every reclamation plan. Groundwater and surface water runoff (both onto and off of the site) must often be evaluated (1) to design flooding and erosion protection measures such as drainage channels, levees, culverts, or riprap; (2) to prepare and carry out a successful revegetation program; (3) to design stable final slopes; (4) to maximize potential available water for the operation and reclamation stages; (5) to prevent the discharge of contaminants from mine processes or from mined areas; and (6) to limit long-term leachate formation and movement from tailings, pit, or waste rock disposal areas. This report is a guide for mine operators, local government, planners, and plan reviewers.

  10. A Dynamic Simulation of the Indirect Land Use Implications of Recent Biofuel Production and Use in the United States.

    SciTech Connect (OSTI)

    Oladosu, Gbadebo A; Kline, Keith L

    2013-01-01

    The global indirect land use change (ILUC) implications of biofuel use in the United States of America (USA) from 2001 to 2010 are evaluated with a dynamic general equilibrium model. The effects of biofuels production on agricultural land area vary by year; from a net expansion of 0.17 ha per 1000 gallons produced (2002) to a net contraction of 0.13 ha per 1000 gallons (2018) in Case 1 of our simulation. In accordance with the general narrative about the implications of biofuel policy, agricultural land area increased in many regions of the world. However, oil-export dependent economies experienced agricultural land contraction because of reductions in their revenues. Reducing crude oil imports is a major goal of biofuel policy, but the land use change implications have received little attention in the literature. Simulations evaluating the effects of doubling supply elasticities for land and fossil resources show that these parameters can significantly influence the land use change estimates. Therefore, research that provides empirically-based and spatially-detailed agricultural land-supply curves and capability to project future fossil energy prices is critical for improving estimates of the effects of biofuel policy on land use.

  11. Environmental assessment of spatial plan policies through land use scenarios

    SciTech Connect (OSTI)

    Geneletti, Davide

    2012-01-15

    This paper presents a method based on scenario analysis to compare the environmental effects of different spatial plan policies in a range of possible futures. The study aimed at contributing to overcome two limitations encountered in Strategic Environmental Assessment (SEA) for spatial planning: poor exploration of how the future might unfold, and poor consideration of alternative plan policies. Scenarios were developed through what-if functions and spatial modeling in a Geographical Information System (GIS), and consisted in maps that represent future land uses under different assumptions on key driving forces. The use of land use scenarios provided a representation of how the different policies will look like on the ground. This allowed gaining a better understanding of the policies' implications on the environment, which could be measured through a set of indicators. The research undertook a case-study approach by developing and assessing land use scenarios for the future growth of Caia, a strategically-located and fast-developing town in rural Mozambique. The effects of alternative spatial plan policies were assessed against a set of environmental performance indicators, including deforestation, loss of agricultural land, encroachment of flood-prone areas and wetlands and access to water sources. In this way, critical environmental effects related to the implementation of each policy were identified and discussed, suggesting possible strategies to address them. - Graphical abstract: Display Omitted Research Highlights: Black-Right-Pointing-Pointer The method contributes to two critical issues in SEA: exploration of the future and consideration of alternatives. Black-Right-Pointing-Pointer Future scenarios are used to test the environmental performance of different spatial plan policies in uncertainty conditions. Black-Right-Pointing-Pointer Spatially-explicit land use scenarios provide a representation of how different policies will look like on the ground.

  12. Impacts of Array Configuration on Land-Use Requirements for Large-Scale Photovoltaic Deployment in the United States: Preprint

    SciTech Connect (OSTI)

    Denholm, P.; Margolis, R. M.

    2008-05-01

    Land use is often cited as an important issue for renewable energy technologies. In this paper we examine the relationship between land-use requirements for large-scale photovoltaic (PV) deployment in the U.S. and PV-array configuration. We estimate the per capita land requirements for solar PV and find that array configuration is a stronger driver of energy density than regional variations in solar insolation. When deployed horizontally, the PV land area needed to meet 100% of an average U.S. citizen's electricity demand is about 100 m2. This requirement roughly doubles to about 200 m2 when using 1-axis tracking arrays. By comparing these total land-use requirements with other current per capita land uses, we find that land-use requirements of solar photovoltaics are modest, especially when considering the availability of zero impact 'land' on rooftops. Additional work is need to examine the tradeoffs between array spacing, self-shading losses, and land use, along with possible techniques to mitigate land-use impacts of large-scale PV deployment.

  13. Renewable Energy Development on Tribal Lands

    SciTech Connect (OSTI)

    Not Available

    2006-10-01

    Brochure describes the Tribal Energy Program, which provides American Indian tribes with financial and technical assistance for developing renewable energy projects on tribal land.

  14. Renewable Energy Development on Tribal Lands (Brochure)

    SciTech Connect (OSTI)

    2009-01-18

    Brochure describes the Tribal Energy Program, which provides American Indian tribes with financial and technical assistance for developing renewable energy projects on tribal land.

  15. Agriculture, land use, and commercial biomass energy

    SciTech Connect (OSTI)

    Edmonds, J.A.; Wise, M.A.; Sands, R.D.; Brown, R.A.; Kheshgi, H.

    1996-06-01

    In this paper we have considered commercial biomass energy in the context of overall agriculture and land-use change. We have described a model of energy, agriculture, and land-use and employed that model to examine the implications of commercial biomass energy or both energy sector and land-use change carbon emissions. In general we find that the introduction of biomass energy has a negative effect on the extent of unmanaged ecosystems. Commercial biomass introduces a major new land use which raises land rental rates, and provides an incentive to bring more land into production, increasing the rate of incursion into unmanaged ecosystems. But while the emergence of a commercial biomass industry may increase land-use change emissions, the overall effect is strongly to reduce total anthropogenic carbon emissions. Further, the higher the rate of commercial biomass energy productivity, the lower net emissions. Higher commercial biomass energy productivity, while leading to higher land-use change emissions, has a far stronger effect on fossil fuel carbon emissions. Highly productive and inexpensive commercial biomass energy technologies appear to have a substantial depressing effect on total anthropogenic carbon emissions, though their introduction raises the rental rate on land, providing incentives for greater rates of deforestation than in the reference case.

  16. LANL Land Transfers 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Land Transfers 2015 LANL Land Transfers 2015 Land transfer activities are planned to occur fiscal year 2016 which will require independent verification of Los Alamos National Laboratory (LANL)'s sampling protocol and analyses. The former Sewage Treatment Plant within land tract A-16-D and the southern portion of A-16-E are on track for MARSSIM final status survey. The remainder of TA-21 will require verification once final D&D of structures is complete. The sampling activities for these

  17. Bureau of Land Management - Final Programmatic Environmental...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Report: Bureau of Land Management - Final Programmatic Environmental Impact Statement for Geothermal Leasing in the...

  18. LANDS WITH WILDERNESS CHARACTERISTICS, RESOURCE MANAGEMENT PLAN...

    Office of Scientific and Technical Information (OSTI)

    AND LAND EXCHANGES: CROSS-JURISDICTIONAL MANAGEMENT AND IMPACTS ON UNCONVENTIONAL FUEL DEVELOPMENT IN UTAH'S UINTA BASIN Utah is rich in oil shale and oil sands resources. ...

  19. Navajo Hopi Land Commission Office (NHLCO): Navajo Hopi Land Commission Office (NHLCO)- 2012 Project

    Broader source: Energy.gov [DOE]

    The Navajo Hopi Land Commission (NHLCO), together with its partners, will conduct a feasibility study (FS) of a program to develop renewable energy on the Paragon-Bisti ranch lands in northwestern New Mexico, which were set aside under the Navajo-Hopi Land Settlement Act for the benefit of relocatees (defined as Navajo families living on Hopi Partitioned Lands as of December 22, 1974).

  20. Notices DEPARTMENT OF ENERGY Western Area Power Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    076 Federal Register / Vol. 81, No. 72 / Thursday, April 14, 2016 / Notices DEPARTMENT OF ENERGY Western Area Power Administration [DOE/EIS-0474] Southline Transmission Line Project Environmental Impact Statement AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) and the U.S. Bureau of Land Management (BLM), acting as joint lead agencies, issued the Proposed Southline Transmission Line Project (Project) Final

  1. 1994 Characterization report for the state approved land disposal site

    SciTech Connect (OSTI)

    Swanson, L.C.

    1994-09-19

    This report summarizes the results of characterization activities at the proposed state-approved land disposal site (SALDS); it updates the original characterization report with studies completed since the first characterization report. The initial characterization report discusses studies from two characterization boreholes, 699-48-77A and 699-48-77B. This revision includes data from implementation of the Groundwater Monitoring Plan and the Aquifer Test Plan. The primary sources of data are two down-gradient groundwater monitoring wells, 699-48-77C and 699-48-77D, and aquifer testing of three zones in well 699-48-77C. The SALDS is located on the Hanford Site, approximately 183 m north of the 200 West Area on the north side of the 200 Areas Plateau. The SALDS is an infiltration basin proposed for disposal of treated effluents from the 200 Areas of Hanford.

  2. The LandScan Global Population Distribution Project: Current State of the Art and Prospective Innovation

    SciTech Connect (OSTI)

    Rose, Amy N; Bright, Eddie A

    2014-01-01

    Advances in remote sensing, dasymetric mapping techniques, and the ever-increasing availability of spatial datasets have enhanced global human population distribution databases. These datasets demonstrate an enormous improvement over the conventional use of choropleth maps to represent population distribution and are vital for analysis and planning purposes including humanitarian response, disease mapping, risk analysis, and evacuation modeling. Dasymetric mapping techniques have been employed to address spatial mismatch, but also to develop finer resolution population distributions in areas of the world where subnational census data are coarse or non-existent. One such implementation is the LandScan Global model which provides a 30 arc-second global population distribution based on ancillary datasets such as land cover, slope, proximity to roads, and settlement locations. This work will review the current state of the LandScan model, future innovations aimed at increasing spatial and demographic resolution, and situate LandScan within the landscape of other global population distribution datasets.

  3. Improving the environment in urban areas

    SciTech Connect (OSTI)

    Adamkus, V.V.

    1994-12-31

    The author discusses the need for improvements to the environment in urban areas, and efforts being made under the direction of the Environmental Protection Agency (EPA) to address these problems. The impact the new Clean Air Act can have on emissions from gasoline powered autos, diesel burning trucks, fixed emission sources ranging from utilities to chemical plants, and consumer products like hair sprays and charcoal starters, will all work together to improve air quality in urban areas. The author also discusses Brownfields Economic Redevelopment Plan efforts being supported by the EPA in a coordinated plan to get municipalities involved in cleaning up areas with pollution, to remove the blight on the urban areas, provide new land for development, and promote additional jobs.

  4. Central Facilities Area Sewage Lagoon Evaluation

    SciTech Connect (OSTI)

    Giesbrecht, Alan

    2015-03-01

    The Central Facilities Area (CFA) located in Butte County, Idaho at Idaho National Laboratory (INL) has an existing wastewater system to collect and treat sanitary wastewater and non contact cooling water from the facility. The existing treatment facility consists of three cells: Cell 1 has a surface area of 1.7 acres, Cell 2 has a surface area of 10.3 acres, and Cell 3 has a surface area of 0.5 acres. If flows exceed the evaporative capacity of the cells, wastewater is discharged to a 73.5 acre land application site that utilizes a center pivot irrigation sprinkler system. The purpose of this current study is to update the analysis and conclusions of the December 2013 study. In this current study, the new seepage rate and influent flow rate data have been used to update the calculations, model, and analysis.

  5. Idaho State Board of Land Commissioners | Open Energy Information

    Open Energy Info (EERE)

    Board of Land Commissioners Jump to: navigation, search Logo: Idaho State Board of Land Commissioners Name: Idaho State Board of Land Commissioners Address: 300 N. 6th St, Suite...

  6. Nevada Division of State Lands | Open Energy Information

    Open Energy Info (EERE)

    State Lands Jump to: navigation, search Logo: Nevada Division of State Lands Name: Nevada Division of State Lands Address: 901 S. Stewart St., Suite 5003 Place: Carson City, Nevada...

  7. VOCALS: The VAMOS Ocean-Cloud-Atmosphere-Land Study () | Data...

    Office of Scientific and Technical Information (OSTI)

    VOCALS: The VAMOS Ocean-Cloud-Atmosphere-Land Study Title: VOCALS: The VAMOS Ocean-Cloud-Atmosphere-Land Study VOCALS (VAMOS* Ocean-Cloud-Atmosphere-Land Study) is an international ...

  8. Sustainable Land Lab Tour | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sustainable Land Lab Tour Sustainable Land Lab Tour PARC researchers and guests were taken on a tour of the new Sustainable land lab and shown the rennovations going on in North ...

  9. Solar Impulse Lands in New York | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impulse Lands in New York Solar Impulse Lands in New York July 8, 2013 - 9:42am Addthis Solar Impulse lands in Washington, DC, at Washington Dulles International Airport as part of ...

  10. An integrated computer modeling environment for regional land use, air quality, and transportation planning

    SciTech Connect (OSTI)

    Hanley, C.J.; Marshall, N.L.

    1997-04-01

    The Land Use, Air Quality, and Transportation Integrated Modeling Environment (LATIME) represents an integrated approach to computer modeling and simulation of land use allocation, travel demand, and mobile source emissions for the Albuquerque, New Mexico, area. This environment provides predictive capability combined with a graphical and geographical interface. The graphical interface shows the causal relationships between data and policy scenarios and supports alternative model formulations. Scenarios are launched from within a Geographic Information System (GIS), and data produced by each model component at each time step within a simulation is stored in the GIS. A menu-driven query system is utilized to review link-based results and regional and area-wide results. These results can also be compared across time or between alternative land use scenarios. Using this environment, policies can be developed and implemented based on comparative analysis, rather than on single-step future projections. 16 refs., 3 figs., 2 tabs.

  11. 300 Area - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    300 Area 324 Building 325 Building 400 AreaFast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim ...

  12. 200 Area - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    300 Area 324 Building 325 Building 400 AreaFast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim ...

  13. 700 Area - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    300 Area 324 Building 325 Building 400 AreaFast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim ...

  14. Sweet Surface Area

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sweet Surface Area Sweet Surface Area Create a delicious root beer float and learn sophisticated science concepts at the same time. Sweet Surface Area Science is all around us, so ...

  15. RAPID/Geothermal/Land Access/New Mexico | Open Energy Information

    Open Energy Info (EERE)

    Mexico State Land Office Competitive Land Leasing: Yes, New Mexico State Land Office issues geothermal leases through competitive auction. Noncompetitive Land Leasing: No Royalty...

  16. Strategic Focus Areas

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Focus Areas Lockheed Martin on behalf of Sandia National Laboratories will consider grant requests that best support the Corporation's strategic focus areas and reflect ...

  17. AREA 5 RWMS CLOSURE

    National Nuclear Security Administration (NNSA)

    153 CLOSURE STRATEGY NEVADA TEST SITE AREA 5 RADIOACTIVE WASTE MANAGEMENT SITE Revision 0 ... Closure Strategy Nevada Test Site Area 5 Radioactive Waste Management ...

  18. ORS Chapter 273 State Lands Generally | Open Energy Information

    Open Energy Info (EERE)

    ORS Chapter 273 State Lands GenerallyLegal Abstract Oregon statute setting forth rules and procedures related to state land. Published NA Year Signed or Took Effect...

  19. Vermont State Lands Administration: Application Page | Open Energy...

    Open Energy Info (EERE)

    State Lands Administration: Application Page Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Vermont State Lands Administration: Application Page...

  20. Utah School and Institutional Trust Lands Administration | Open...

    Open Energy Info (EERE)

    School and Institutional Trust Lands Administration Jump to: navigation, search Logo: Utah School and Institutional Trust Lands Administration Name: Utah School and Institutional...

  1. Mays Landing, New Jersey: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Smart Grid Project Registered Energy Companies in Mays Landing, New Jersey Energy Enterprises Utility Companies in Mays Landing, New Jersey Atlantic City Electric Co References...

  2. Utah Public Lands Policy Coordination Office | Open Energy Information

    Open Energy Info (EERE)

    Lands Policy Coordination Office Jump to: navigation, search Name: Governor's Public Lands Policy Coordination Office Address: 5110 State Office Building Place: Salt Lake City,...

  3. Bayesian Calibration of the Community Land Model using Surrogates...

    Office of Scientific and Technical Information (OSTI)

    Bayesian Calibration of the Community Land Model using Surrogates Citation Details In-Document Search Title: Bayesian Calibration of the Community Land Model using Surrogates We ...

  4. Hawaii Department of Land and Natural Resources Office of Conservation...

    Open Energy Info (EERE)

    to: navigation, search Name: Hawaii Department of Land and Natural Resources Office of Conservation and Coastal Lands From Open Energy Information Address: P.O. Box 261 Place:...

  5. Soil carbon sequestration and land use change associated with...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Soil carbon sequestration and land use change associated with biofuel production: empirical evidence Title Soil carbon sequestration and land use change associated with biofuel...

  6. Land Management Practices More Critical as Biofuels Use Grows

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Land Management Practices More Critical as Biofuels Use Grows Land Management Practices More Critical as Biofuels Use Grows Climate Simulations Run at NERSC Show Cultivation Causes ...

  7. Oregon Land Management Division - Easements | Open Energy Information

    Open Energy Info (EERE)

    Division - Easements Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Land Management Division - Easements Author Oregon Land Management...

  8. Bacteria increase arid-land soil surface temperature through...

    Office of Scientific and Technical Information (OSTI)

    Bacteria increase arid-land soil surface temperature through the production of sunscreens Prev Next Title: Bacteria increase arid-land soil surface temperature through the ...

  9. Department of Energy Land Ice Modeling Efforts (Conference) ...

    Office of Scientific and Technical Information (OSTI)

    Energy Land Ice Modeling Efforts Citation Details In-Document Search Title: Department of Energy Land Ice Modeling Efforts Authors: Price, Stephen F. Dr 1 + Show Author...

  10. Coordination of Federal Transmission Permitting on Federal Lands...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, ...

  11. EA-1856: Conveyance of Land and Facilities at the Portsmouth...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    56: Conveyance of Land and Facilities at the Portsmouth Gaseous Diffusion Plant for Economic Development Purposes, Piketon, Ohio EA-1856: Conveyance of Land and Facilities at the...

  12. Assessment of Biomass Resources from Marginal Lands in APEC Countries...

    Open Energy Info (EERE)

    Biomass Resources from Marginal Lands in APEC Countries Jump to: navigation, search Logo: Assessment of Biomass Resources from Marginal Lands in APEC Countries Name Assessment of...

  13. RAPID/Geothermal/Land Access/Montana | Open Energy Information

    Open Energy Info (EERE)

    Way Easement for Utilities Through State Lands. Local Land Access Process not available Policies & Regulations An Introduction to Electric Power Transmission Environmental...

  14. Oregon Division of State Lands | Open Energy Information

    Open Energy Info (EERE)

    Lands. The agency is comprised of four divisions: Director's Office, Land Management, Wetlands and Waterways Conservation, and Finance and Administration, and the South Slough...

  15. Vectorizing the Community Land Model (CLM) (Journal Article)...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Vectorizing the Community Land Model (CLM) Citation Details In-Document Search Title: Vectorizing the Community Land Model (CLM) In this paper we describe our...

  16. Agriculture and Land Use National Greenhouse Gas Inventory Software...

    Open Energy Info (EERE)

    Agriculture and Land Use National Greenhouse Gas Inventory Software Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Agriculture and Land Use National Greenhouse Gas...

  17. Mozambique-Biofuels, Land Access and Rural Livelihoods | Open...

    Open Energy Info (EERE)

    Biofuels, Land Access and Rural Livelihoods Jump to: navigation, search Name Mozambique-Biofuels, Land Access and Rural Livelihoods AgencyCompany Organization International...

  18. Tanzania-Biofuels, Land Access and Rural Livelihoods | Open Energy...

    Open Energy Info (EERE)

    Tanzania-Biofuels, Land Access and Rural Livelihoods Jump to: navigation, search Name Tanzania-Biofuels, Land Access and Rural Livelihoods AgencyCompany Organization...

  19. RAPID/Geothermal/Land Use/Federal | Open Energy Information

    Open Energy Info (EERE)

    RAPIDGeothermalLand UseFederal < RAPID | Geothermal | Land Use Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk...

  20. RAPID/Geothermal/Land Access/Colorado | Open Energy Information

    Open Energy Info (EERE)

    RAPIDGeothermalLand AccessColorado < RAPID | Geothermal | Land Access Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About...

  1. RAPID/Geothermal/Land Access/Oregon | Open Energy Information

    Open Energy Info (EERE)

    RAPIDGeothermalLand AccessOregon < RAPID | Geothermal | Land Access Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk...

  2. RAPID/Geothermal/Land Access/Alaska | Open Energy Information

    Open Energy Info (EERE)

    RAPIDGeothermalLand AccessAlaska < RAPID | Geothermal | Land Access Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk...

  3. CleanEnergyProjectsonTribalLands_Project_Descriptions_072011...

    Broader source: Energy.gov (indexed) [DOE]

    CleanEnergyProjectsonTribalLandsProjectDescriptions072011.pdf More Documents & Publications CleanEnergyProjectsonTribalLandsProjectDescriptions072011.pdf...

  4. Idaho - Idaho Dept. of Lands - Application for Easement | Open...

    Open Energy Info (EERE)

    Easement. Boise, Idaho. Idaho Department of Lands. Easement Application Instructions; 4p. Retrieved from "http:en.openei.orgwindex.php?titleIdaho-IdahoDept.ofLands-A...

  5. Title 16 USC 818 Public Lands Included in Project - Reservation...

    Open Energy Info (EERE)

    Entry (1996). Retrieved from "http:en.openei.orgwindex.php?titleTitle16USC818PublicLandsIncludedinProject-ReservationofLandsFromEntry&oldid722800" ...

  6. ORS 197 - Comprehensive Land Use Planning | Open Energy Information

    Open Energy Info (EERE)

    197 - Comprehensive Land Use Planning Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: ORS 197 - Comprehensive Land Use...

  7. RAPID/Geothermal/Land Access/Utah | Open Energy Information

    Open Energy Info (EERE)

    RAPIDGeothermalLand AccessUtah < RAPID | Geothermal | Land Access Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk...

  8. Hawaii's Rainforest Crunch: Land, People, and Geothermal Development...

    Open Energy Info (EERE)

    Rainforest Crunch: Land, People, and Geothermal Development Jump to: navigation, search OpenEI Reference LibraryAdd to library Periodical: Hawaii's Rainforest Crunch: Land, People,...

  9. California Land Use Planning Information Network | Open Energy...

    Open Energy Info (EERE)

    Land Use Planning Information Network Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: California Land Use Planning Information...

  10. Beijing Ideal land Technology Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Ideal land Technology Development Co Ltd Jump to: navigation, search Name: Beijing Ideal-land Technology Development Co Ltd Place: China Sector: Biofuels Product: Biofuels (...

  11. Geothermal/Land Use Planning | Open Energy Information

    Open Energy Info (EERE)

    GeothermalLand Use Planning < Geothermal Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Planning Leasing Exploration Well Field Power Plant Grid Connection...

  12. Hawaii Department of Land and Natural Resources | Open Energy...

    Open Energy Info (EERE)

    Logo: Hawaii Department of Land and Natural Resources Name: Hawaii Department of Land and Natural Resources Address: 1151 Punchbowl St Place: Honolulu, Hawaii Zip: 96813 Website:...

  13. RAPID/Geothermal/Land Access/Nevada | Open Energy Information

    Open Energy Info (EERE)

    RAPIDGeothermalLand AccessNevada < RAPID | Geothermal | Land Access Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk...

  14. Montana - Land Use License Application | Open Energy Information

    Open Energy Info (EERE)

    Land Use License Application Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Montana - Land Use License Application Author Montana Department of Natural...

  15. RAPID/Solar/Land Access/Nevada | Open Energy Information

    Open Energy Info (EERE)

    RAPIDSolarLand AccessNevada < RAPID | Solar | Land Access Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk...

  16. EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Gaseous Diffusion Plant Potential Land and Facilities Transfers; McCracken County, Kentucky EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities ...

  17. Carbon Sequestration on Surface Mine Lands

    SciTech Connect (OSTI)

    Donald Graves; Christopher Barton; Richard Sweigard; Richard Warner; Carmen Agouridis

    2006-03-31

    Since the implementation of the federal Surface Mining Control and Reclamation Act of 1977 (SMCRA) in May of 1978, many opportunities have been lost for the reforestation of surface mines in the eastern United States. Research has shown that excessive compaction of spoil material in the backfilling and grading process is the biggest impediment to the establishment of productive forests as a post-mining land use (Ashby, 1998, Burger et al., 1994, Graves et al., 2000). Stability of mine sites was a prominent concern among regulators and mine operators in the years immediately following the implementation of SMCRA. These concerns resulted in the highly compacted, flatly graded, and consequently unproductive spoils of the early post-SMCRA era. However, there is nothing in the regulations that requires mine sites to be overly compacted as long as stability is achieved. It has been cultural barriers and not regulatory barriers that have contributed to the failure of reforestation efforts under the federal law over the past 27 years. Efforts to change the perception that the federal law and regulations impede effective reforestation techniques and interfere with bond release must be implemented. Demonstration of techniques that lead to the successful reforestation of surface mines is one such method that can be used to change perceptions and protect the forest ecosystems that were indigenous to these areas prior to mining. The University of Kentucky initiated a large-scale reforestation effort to address regulatory and cultural impediments to forest reclamation in 2003. During the three years of this project 383,000 trees were planted on over 556 acres in different physiographic areas of Kentucky (Table 1, Figure 1). Species used for the project were similar to those that existed on the sites before mining was initiated (Table 2). A monitoring program was undertaken to evaluate growth and survival of the planted species as a function of spoil characteristics and

  18. Surface Meteorology, Barrow, Alaska, Area A, B, C and D, Ongoing from 2012

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Bob Busey; Larry Hinzman; William Cable; Vladimir Romanovsky

    2014-12-04

    Meteorological data are being collected at several points within four intensive study areas in Barrow. These data assist in the calculation of the energy balance at the land surface and are also useful as inputs into modeling activities.

  19. Surface Meteorology, Barrow, Alaska, Area A, B, C and D, Ongoing from 2012

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Bob Busey; Larry Hinzman; William Cable; Vladimir Romanovsky

    Meteorological data are being collected at several points within four intensive study areas in Barrow. These data assist in the calculation of the energy balance at the land surface and are also useful as inputs into modeling activities.

  20. Hazard perception and the economic impact of internment on residential land values

    SciTech Connect (OSTI)

    Merz, J.F.

    1983-04-01

    The potential for large scale natural and man-made hazards exists in the form of hurricanes, earthquakes, volcanoes, floods, dams, accidents involving poisonous, explosive or radioactive materials, and severe pollution or waste disposal mishaps. Regions prone to natural hazards and areas located proximally to technological hazards may be subject to economic losses from low probability-high consequence events. Economic costs may be incurred in: evacuation and relocation of inhabitants; personal, industrial, agricultural, and tax revenue losses; decontamination; property damage or loss of value; and temporary or prolonged internment of land. The value of land in an area subjected to a low probability-high consequence event may decrease, reflecting, a fortiori, a reluctance to continue living in the area or to repopulate a region which had required internment. The future value of such land may be described as a function of location, time, interdiction period (if applicable), and variables reflecting the magnitude of the perceived hazard. This paper presents a study of these variables and proposes a model for land value estimation. As an example, the application of the model to the Love Canal area in Niagara Falls, New York is presented.

  1. ARM - Lesson Plans: When Land Ice Melts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Arctic and Antarctica are covered with large, heavy sheets of ice. Other islands like New Zealand have ice masses in the form of glaciers on them. When land-based ice melts, ...

  2. AG Land 1 | Open Energy Information

    Open Energy Info (EERE)

    LLC Developer AG Land Energy LLC Energy Purchaser Alliant Energy Location Story County IA Coordinates 42.145531, -93.432161 Show Map Loading map... "minzoom":false,"mappings...

  3. AG Land 4 | Open Energy Information

    Open Energy Info (EERE)

    LLC Developer AG Land Energy LLC Energy Purchaser Alliant Energy Location Story County IA Coordinates 42.206397, -93.325714 Show Map Loading map... "minzoom":false,"mappings...

  4. AG Land 2 | Open Energy Information

    Open Energy Info (EERE)

    LLC Developer AG Land Energy LLC Energy Purchaser Alliant Energy Location Story County IA Coordinates 41.904231, -93.354864 Show Map Loading map... "minzoom":false,"mappings...

  5. AG Land 3 | Open Energy Information

    Open Energy Info (EERE)

    LLC Developer AG Land Energy LLC Energy Purchaser Alliant Energy Location Story County IA Coordinates 42.146061, -93.428028 Show Map Loading map... "minzoom":false,"mappings...

  6. 2015 Tribal Lands and Environment Forum

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Institute for Tribal Environmental Professionals (ITEP) are hosting the annual Tribal Lands and Environment Forum. The four-day forum will feature special trainings, field trips, and breakout sessions focused on tribal water programs.

  7. 2015 Tribal Lands and Environment Forum

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Institute for Tribal Environmental Professionals (ITEP) are hosting the annual Tribal Lands and Environment Forum. The four-day forum will feature special trainings, field trips, and breakout...

  8. solar land use | OpenEI Community

    Open Energy Info (EERE)

    solar land use Home Rosborne318's picture Submitted by Rosborne318(5) Member 2 December, 2013 - 11:06 Request for Information Renewable Energy GenerationProduction Shreveport...

  9. Renewable Energy Development on Tribal Lands Conference

    Broader source: Energy.gov [DOE]

    The Electric Utility Consultants, Inc. (EUCI) is hosting a conference to examine key considerations when designing tribal projects to improve feasibility, assess risks and opportunities of active vs. passive tribal participation, and building a project on tribal lands.

  10. Land Use License | Open Energy Information

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Land Use LicenseLegal Published NA Year Signed or Took Effect 2013 Legal Citation Not...

  11. pv land use | OpenEI Community

    Open Energy Info (EERE)

    pv land use Home Rosborne318's picture Submitted by Rosborne318(5) Member 2 December, 2013 - 11:06 Request for Information Renewable Energy GenerationProduction Shreveport Airport...

  12. Land O Lakes Inc | Open Energy Information

    Open Energy Info (EERE)

    O Lakes Inc Jump to: navigation, search Name: Land O'Lakes Inc Place: Saint Paul, Minnesota Zip: 55164-0101 Product: Farmer-owned cooperative, marketer of dairy-based products for...

  13. Explicitly Accounting for Protected Lands within the GCAM 3.0

    SciTech Connect (OSTI)

    Dooley, James J.; Zhou, Yuyu

    2012-05-01

    The Global Change Assessment Model Version 3.0 defines three different levels of “Protected Lands” within the agricultural and landuse component. These three different scenarios effectively cordon off 3.5% (5.0 million km2) of the Earth’s terrestrial lands in the de minimus Protected Land Scenario, 5.0% (7.20 million km2) in the Core Protected Land Scenario, and 8.2% (11.8 million km2) in the Expanded Protected Land Scenario. None of these scenarios represents the “right” level of Protected Lands for the planet today or tomorrow. Rather, the goal is to create a range of scenarios that can be used in modeling human responses to climate change and the impact those would have on managed and unmanaged terrestrial lands. These scenarios harness the wealth of information in the United Nations Environment Programme World Conservation Monitoring Centre’s World Database on Protected Areas and its categories of explicit degrees of protection.

  14. 100 Area - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    00 Area About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration Disposal Facility F Reactor H

  15. Land Record System PIA, Bonneville Power Administration | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration (61.28 KB) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory

  16. Sales of Fossil Fuels Produced from Federal and Indian Lands, FY 2003 through FY 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Map Appendix State/area maps Figure A1. Fossil fuel production on federal and Indian lands, FY 2014 Source: U.S. Energy Information Administration based on U.S. Department of the Interior, Office of Natural Resources Revenue. "ONNR Statistical Information Site" (http://statistics.onrr.gov). July 2015 U.S. Energy Information Administration | Sales of Fossil Fuels Produced on Federal and Indian Lands, FY 2003 through FY 2014 24 Figure A2. Changes in fossil fuels production (trillion

  17. Integrated Assessment and the Relation Between Land-Use Change and Climate Change

    DOE R&D Accomplishments [OSTI]

    Dale, V. H.

    1994-10-07

    Integrated assessment is an approach that is useful in evaluating the consequences of global climate change. Understanding the consequences requires knowledge of the relationship between land-use change and climate change. Methodologies for assessing the contribution of land-use change to atmospheric CO{sub 2} concentrations are considered with reference to a particular case study area: south and southeast Asia. The use of models to evaluate the consequences of climate change on forests must also consider an assessment approach. Each of these points is discussed in the following four sections.

  18. Technical Area 21

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technical Area 21 Technical Area 21 Technical Area 21 was the site of chemical research for refining plutonium and plutonium metal production from 1945 to 1978. August 1, 2013 Technical Area 21 in 2011 Technical Area 21 in 2011 Technical Area 21 (TA-21), also known as DP Site was the site of chemical research for refining plutonium and plutonium metal production from 1945 to 1978. Between 2008 and 2011, MDAs B, U, and V were excavated and removed. 24 buildings were demolished in 2010 and 2011

  19. Reinventing the Bureau of Land Management

    SciTech Connect (OSTI)

    Yager, J.O.; Muller, K.

    1995-12-01

    The Bureau of Land Management (BLM) has developed a {open_quotes}Blueprint for the Future{close_quotes} changing its organizational structure to better manage nearly 270 million acres of public lands and 540 million acres of subsurface mineral resources. Both efforts focus on ecosystem management and better business practices. The mission identified in the {open_quotes}Blueprint{close_quotes} is {open_quotes}to sustain the health, diversity and productivity of the public lands for the use and enjoyment of present and future generations.{close_quotes} Within this mission goals include maintaining healthy ecosystems and improving customer service and business practices. In conjunction with the Blueprint, the BLM developed strategies to streamline its headquarters and field organizational structures and to accommodate an ecosystem management approach. The new headquarters structure uses flexible interdisciplinary work teams in place of the programmatic hierarchical approach. These teams may be established on either a permanent or temporary basis. For example, one team is responsible for reporting on the condition of the public lands as an essential part of maintaining healthy ecosystems. Although it is too early to judge the success of the BLM`s reinvention efforts, insights can be gained from a review of these efforts. One insight is that most people are so used to thinking about the public lands on a statute by statute, resource by resource, project by project basis, that is difficult for them to adjust to the ecosystem management or streamlining paradigms.

  20. Land management practices to become important as biofuels use grows |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration (61.28 KB) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory

    Land and Asset

  1. Site Monitoring Area Maps

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maps Individual Permit: Site Monitoring Area Maps Each Site Monitoring Area Map is updated whenever the map information is updated. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email What do these maps show? The Individual Permit for Storm Water site monitoring area maps display the following information: Surface hydrological features Locations of the Site(s) assigned to the Site Monitoring Area (SMA) The Site Monitoring

  2. Results from KamLAND-Zen

    SciTech Connect (OSTI)

    Asakura, K.; Gando, A.; Gando, Y.; Hachiya, T.; Hayashida, S.; Ikeda, H.; Inoue, K.; Ishidoshiro, K.; Ishikawa, T.; Ishio, S.; Koga, M.; Matsuda, R.; Matsuda, S.; Mitsui, T.; Motoki, D.; Nakamura, K.; Obara, S.; Oki, Y.; Otani, M.; Oura, T.; Shimizu, I.; Shirahata, Y.; Shirai, J.; Suzuki, A.; Tachibana, H.; Tamae, K.; Ueshima, K.; Watanabe, H.; Xu, B. D.; Yamauchi, Y.; Yoshida, H.; Kozlov, A.; Takemoto, Y.; Yoshido, S.; Fushimi, K.; Banks, T. I.; Freedman, S. J.; Fujikawa, B. K.; O'Donnell, T.; Winslow, L. A.; Berger, B. E.; Efremenko, Y.; Karwowski, H. J.; Markoff, D. M.; Tornow, W.; Detwiler, J. A.; Enomoto, S.; Decowski, M. P.

    2015-07-15

    KamLAND-Zen reports on a preliminary search for neutrinoless double-beta decay with 136Xe based on 114.8 live-days after the purification of the xenon loaded liquid scintillator. In this data, the problematic 110mAg background peak identified in previous searches is reduced by more than a factor of 10. By combining the KamLAND-Zen pre- and post-purification data, we obtain a preliminary lower limit on the 0??? decay half-life of T0?1/2 > 2.61025 yr at 90% C.L. The search sensitivity will be enhanced with additional low background data after the purification. As a result, prospects for further improvements with future KamLAND-Zen upgrades are also presented.

  3. Results from KamLAND-Zen

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Asakura, K.; Gando, A.; Gando, Y.; Hachiya, T.; Hayashida, S.; Ikeda, H.; Inoue, K.; Ishidoshiro, K.; Ishikawa, T.; Ishio, S.; et al

    2015-07-15

    KamLAND-Zen reports on a preliminary search for neutrinoless double-beta decay with 136Xe based on 114.8 live-days after the purification of the xenon loaded liquid scintillator. In this data, the problematic 110mAg background peak identified in previous searches is reduced by more than a factor of 10. By combining the KamLAND-Zen pre- and post-purification data, we obtain a preliminary lower limit on the 0νββ decay half-life of T0ν1/2 > 2.6×1025 yr at 90% C.L. The search sensitivity will be enhanced with additional low background data after the purification. As a result, prospects for further improvements with future KamLAND-Zen upgrades are alsomore » presented.« less

  4. A framework for benchmarking land models

    SciTech Connect (OSTI)

    Luo, Yiqi; Randerson, J.; Abramowitz, G.; Bacour, C.; Blyth, E.; Carvalhais, N.; Ciais, Philippe; Dalmonech, D.; Fisher, J.B.; Fisher, R.; Friedlingstein, P.; Hibbard, Kathleen A.; Hoffman, F. M.; Huntzinger, Deborah; Jones, C.; Koven, C.; Lawrence, David M.; Li, D.J.; Mahecha, M.; Niu, S.L.; Norby, Richard J.; Piao, S.L.; Qi, X.; Peylin, P.; Prentice, I.C.; Riley, William; Reichstein, M.; Schwalm, C.; Wang, Y.; Xia, J. Y.; Zaehle, S.; Zhou, X. H.

    2012-10-09

    Land models, which have been developed by the modeling community in the past few decades to predict future states of ecosystems and climate, have to be critically evaluated for their performance skills of simulating ecosystem responses and feedback to climate change. Benchmarking is an emerging procedure to measure performance of models against a set of defined standards. This paper proposes a benchmarking framework for evaluation of land model performances and, meanwhile, highlights major challenges at this infant stage of benchmark analysis. The framework includes (1) targeted aspects of model performance to be evaluated, (2) a set of benchmarks as defined references to test model performance, (3) metrics to measure and compare performance skills among models so as to identify model strengths and deficiencies, and (4) model improvement. Land models are required to simulate exchange of water, energy, carbon and sometimes other trace gases between the atmosphere and land surface, and should be evaluated for their simulations of biophysical processes, biogeochemical cycles, and vegetation dynamics in response to climate change across broad temporal and spatial scales. Thus, one major challenge is to select and define a limited number of benchmarks to effectively evaluate land model performance. The second challenge is to develop metrics of measuring mismatches between models and benchmarks. The metrics may include (1) a priori thresholds of acceptable model performance and (2) a scoring system to combine datamodel mismatches for various processes at different temporal and spatial scales. The benchmark analyses should identify clues of weak model performance to guide future development, thus enabling improved predictions of future states of ecosystems and climate. The near-future research effort should be on development of a set of widely acceptable benchmarks that can be used to objectively, effectively, and reliably evaluate fundamental properties of land models

  5. A framework for benchmarking land models

    SciTech Connect (OSTI)

    Luo, Yiqi; Randerson, James T.; Hoffman, Forrest; Norby, Richard J

    2012-01-01

    Land models, which have been developed by the modeling community in the past few decades to predict future states of ecosystems and climate, have to be critically evaluated for their performance skills of simulating ecosystem responses and feedback to climate change. Benchmarking is an emerging procedure to measure performance of models against a set of defined standards. This paper proposes a benchmarking framework for evaluation of land model performances and, meanwhile, highlights major challenges at this infant stage of benchmark analysis. The framework includes (1) targeted aspects of model performance to be evaluated, (2) a set of benchmarks as defined references to test model performance, (3) metrics to measure and compare performance skills among models so as to identify model strengths and deficiencies, and (4) model improvement. Land models are required to simulate exchange of water, energy, carbon and sometimes other trace gases between the atmosphere and land surface, and should be evaluated for their simulations of biophysical processes, biogeochemical cycles, and vegetation dynamics in response to climate change across broad temporal and spatial scales. Thus, one major challenge is to select and define a limited number of benchmarks to effectively evaluate land model performance. The second challenge is to develop metrics of measuring mismatches between models and benchmarks. The metrics may include (1) a priori thresholds of acceptable model performance and (2) a scoring system to combine data model mismatches for various processes at different temporal and spatial scales. The benchmark analyses should identify clues of weak model performance to guide future development, thus enabling improved predictions of future states of ecosystems and climate. The near-future research effort should be on development of a set of widely acceptable benchmarks that can be used to objectively, effectively, and reliably evaluate fundamental properties of land models

  6. Coastal land loss in Texas - An overview

    SciTech Connect (OSTI)

    Morton, R.A.; Paine, J.G. )

    1990-09-01

    Each year in Texas more than 1,500 acres of prime real estate and productive wetlands are destroyed along the Gulf shoreline and near the bay margins primarily as a result of coastal erosion and submergence. Wetland losses constitute about half of the total land losses. Historical analyses of maps and aerial photographs since the mid-1800s indicate that land losses are accelerating and that human activities are either directly or indirectly responsible for the increased losses, Natural decreases in sediment supply since the modern sea-level stillstand have been exacerbated by (1) river basin projects that reduce the volume of sediment transported to the coast and (2) coastal structures and navigation projects that prevent redistribution of littoral sediments along the coast. Erosion is primarily caused by high wave and current energy combined with an inadequate supply of sediment. Erosion is responsible for higher local rates of land loss than submergence, and the erosion losses are more perceptible, especially after major storms when the greatest losses occur. The principal components of submergence are subsidence and the eustatic rise in sea level. Together these components are recorded by tide gauges as a relative rise in sea level. Submergence converts uplands to wetlands and wetlands to open water. These surficial changes occur mostly on the coastal plain but are also observed on barrier islands and bayhead deltas and within entrenched valleys. Although compactional subsidence is a natural process operating in the Gulf Coast basin, most of the accelerated land-surface subsidence in Texas is attributed to extraction of shallow ground water or production of hydrocarbons at moderate depths. Faults activated by the withdrawal of these fluids concentrate the subsidence near the fault planes. Coastal land losses caused by dredging are less than those caused by erosion and submergence, but they constitute a growing percentage of total land losses.

  7. From land use to land cover: Restoring the afforestation signal in a coupled integrated assessment - earth system model and the implications for CMIP5 RCP simulations

    SciTech Connect (OSTI)

    Di Vittorio, Alan; Chini, Louise M.; Bond-Lamberty, Benjamin; Mao, Jiafu; Shi, Xiaoying; Truesdale, John E.; Craig, Anthony P.; Calvin, Katherine V.; Jones, Andrew D.; Collins, William D.; Edmonds, James A.; Hurtt, George; Thornton, Peter E.; Thomson, Allison M.

    2014-11-27

    Climate projections depend on scenarios of fossil fuel emissions and land use change, and the IPCC AR5 parallel process assumes consistent climate scenarios across Integrated Assessment and Earth System Models (IAMs and ESMs). To facilitate consistency, CMIP5 used a novel land use harmonization to provide ESMs with seamless, 1500-2100 land use trajectories generated by historical data and four IAMs. However, we have identified and partially addressed a major gap in the CMIP5 land coupling design. The CMIP5 Community ESM (CESM) global afforestation is only 22% of RCP4.5 afforestation from 2005 to 2100. Likewise, only 17% of the Global Change Assessment Models (GCAMs) 2040 RCP4.5 afforestation signal, and none of the pasture loss, were transmitted to CESM within a newly integrated model. This is a critical problem because afforestation is necessary for achieving the RCP4.5 climate stabilization. We attempted to rectify this problem by modifying only the ESM component of the integrated model, enabling CESM to simulate 66% of GCAMs afforestation in 2040, and 94% of GCAMs pasture loss as grassland and shrubland losses. This additional afforestation increases vegetation carbon gain by 19 PgC and decreases atmospheric CO2 gain by 8 ppmv from 2005 to 2040, implying different climate scenarios between CMIP5 GCAM and CESM. Similar inconsistencies likely exist in other CMIP5 model results, primarily because land cover information is not shared between models, with possible contributions from afforestation exceeding model-specific, potentially viable forest area. Further work to harmonize land cover among models will be required to adequately rectify this problem.

  8. Land use and value after reclamation

    SciTech Connect (OSTI)

    Phelps, W.R.

    1998-12-31

    This presentation discusses the process of analyzing the size and condition of producing land parcels concerning management and income relationships, tract location, and soil and water conservation structures. It reviews production schemes for crops such as corn, soybeans, wheat, alfalfa hay, and warm season grasses, as well as use for recreation. Management of tenants and leases is discussed concerning evaluation of crop share leases, cash renting, custom farming, and tenant selection. Factors involving subsidence due to underground mining by longwall or room and pillar extraction are discussed. Issues related to planning for and management of taxes, long-term improvements, and other land costs are presented.

  9. Preliminary investigation Area 12 fleet operations steam cleaning discharge area Nevada Test Site

    SciTech Connect (OSTI)

    1996-07-01

    This report documents the characterization activities and findings of a former steam cleaning discharge area at the Nevada Test Site. The former steam cleaning site is located in Area 12 east of Fleet Operations Building 12-16. The characterization project was completed as a required condition of the ``Temporary Water Pollution Control Permit for the Discharge From Fleet Operations Steam Cleaning Facility`` issued by the Nevada Division of Environmental Protection. The project objective was to collect shallow soil samples in eight locations in the former surface discharge area. Based upon field observations, twelve locations were sampled on September 6, 1995 to better define the area of potential impact. Samples were collected from the surface to a depth of approximately 0.3 meters (one foot) below land surface. Discoloration of the surface soil was observed in the area of the discharge pipe and in localized areas in the natural drainage channel. The discoloration appeared to be consistent with the topographically low areas of the site. Hydrocarbon odors were noted in the areas of discoloration only. Samples collected were analyzed for bulk asbestos, Toxicity Characteristic Leaching Procedure (TCLP) metals, total petroleum hydrocarbons (TPHs), volatile organic compounds (VOCs), semi-volatile organic compounds (Semi-VOCs), and gamma scan.

  10. Ecological perspectives of land use history: The Arid Lands Ecology (ALE) Reserve

    SciTech Connect (OSTI)

    Hinds, N R; Rogers, L E

    1991-07-01

    The objective of this study was to gather information on the land use history of the Arid Land Ecology (ALE) Reserve so that current ecological research could be placed within a historical perspective. The data were gathered in the early 1980s by interviewing former users of the land and from previously published research (where available). Interviews with former land users of the ALE Reserve in Benton County, Washington, revealed that major land uses from 1880 to 1940 were homesteading, grazing, oil/gas production, and road building. Land use practices associated with grazing and homesteading have left the greatest impact on the landscape. Disturbed sites where succession is characterized by non-native species, plots where sagebrush was railed away, and sheep trails are major indications today of past land uses. Recent estimates of annual bunchgrass production do ALE do not support the widespread belief that bunchgrass were more productive during the homesteading era, though the invasion of cheatgrass (Bromus tectorum), Jim Hill mustard (Sisymbrium altissium), and other European alien plant species has altered pre-settlement succession patterns. 15 refs., 6 figs., 1 tab.

  11. Climate Effects of Global Land Cover Change

    SciTech Connect (OSTI)

    Gibbard, S G; Caldeira, K; Bala, G; Phillips, T; Wickett, M

    2005-08-24

    There are two competing effects of global land cover change on climate: an albedo effect which leads to heating when changing from grass/croplands to forest, and an evapotranspiration effect which tends to produce cooling. It is not clear which effect would dominate in a global land cover change scenario. We have performed coupled land/ocean/atmosphere simulations of global land cover change using the NCAR CAM3 atmospheric general circulation model. We find that replacement of current vegetation by trees on a global basis would lead to a global annual mean warming of 1.6 C, nearly 75% of the warming produced under a doubled CO{sub 2} concentration, while global replacement by grasslands would result in a cooling of 0.4 C. These results suggest that more research is necessary before forest carbon storage should be deployed as a mitigation strategy for global warming. In particular, high latitude forests probably have a net warming effect on the Earth's climate.

  12. Restoration of abandoned mine lands through cooperative coal resource evaluations

    SciTech Connect (OSTI)

    Hoskins, D.M.; Smith, M.

    1996-12-31

    The public reclamation cost of reclaiming all of Pennsylvania`s abandoned mine lands is estimated at $15 billion. Drainage from abandoned mines poses another $5 billion water pollution clean-up problem. Although it is unlikely that public reclamation alone could ever tackle these problems, much can be done to alleviate the nuisances through the remining of previously mined areas to recover remaining reserves, restore the land and improve water quality in the same process. Remining of priority areas is encouraged through a new Pennsylvania policy which provides incentives to mining companies. One incentive, initiated under Pennsylvania`s comprehensive mine reclamation strategy, is to identify and geologically map reminable coal resources in selected watersheds, and then to expedite mine permitting in these watersheds. At present, two such priority watersheds, Little Toby Creek in Elk County and Tangascootak Creek in Clinton County, are the focus of geologic map compilation based on recent quadrangle mapping, or new, directed, geologic mapping, including new research core drilling to establish the geologic stratigraphic framework. In order to maximize environmental benefits the comprehensive mine reclamation strategy identifies watersheds which are affected by acid mine drainage (AMD), but that are reasonably capable of restoration, if sufficient coal reserves remain. Pennsylvania`s geochemical quality database of rock overburden, in combination with detailed coal resource mapping by the Pennsylvania Geological Survey, and the cooperation of coal companies and leaseholders, is being used by the Department of Environmental Protection (DEP) to identify and design remining projects which will not only allow the recovery of coal resources, but will also improve the water quality through a variety of innovative mining techniques.

  13. H2A Delivery: GH2 and LH2 Forecourt Land Areas

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Setback distances specified by NFPA 55 Compressed Hydrogen Wall Opening: ... (wi ) 5 5 5 5 5 5 5 5 15 15 15 15 i m m m 2 99 115 115 130 1 1 2 3 ) m 2 1112 1112 1112 ...

  14. H2A Delivery: GH2 and LH2 Forecourt Land Areas

    Broader source: Energy.gov [DOE]

    Presentation by Matthew Hooks of TIAX at the Joint Meeting on Hydrogen Delivery Modeling and Analysis, May 8-9, 2007

  15. Harnessing the Power of the Sun, Solar Impulse Plane Lands in DC Area

    Office of Energy Efficiency and Renewable Energy (EERE)

    Today, Secretary Moniz spoke at an event welcoming the arrival of the solar-powered Solar Impulse plane at Dulles International Airport near Washington, D.C.

  16. Inner Area Principles

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Inner Area Principles The Inner Area principles proposed by the Tri-Parties are a good beginning toward consideration of what kind of approach will be needed to remedy the problems of the Central Plateau. However, the Board feels that some principles have been overlooked in the preparation of these. [1] While it has been generally agreed that designated waste disposal facilities of the Inner Area (like ERDF and IDF) would not be candidates for remediation. What happened to the remedial approach

  17. Imperial Valley Geothermal Area

    Broader source: Energy.gov [DOE]

    The Imperial Valley Geothermal project consists of 10 generating plants in the Salton Sea Known Geothermal Resource Area in Southern California's Imperial Valley. The combined capacity at Imperial...

  18. Western Area Power Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Area Power Administration Follow-up to Nov. 25, 2008 Transition ... Southwestern Power Administration CONSTRUCTION BUDGET ITEM DESCRIPTION FY 2009* MICROWAVE ...

  19. Vermont Land Use: Essentials of Local Land Use Planning and Regulation...

    Open Energy Info (EERE)

    Use: Essentials of Local Land Use Planning and Regulation Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook:...

  20. Optimizing the Use of Federal Lands Through Disposition

    Broader source: Energy.gov [DOE]

    The foundation of the U.S. Department of Energy (DOE) Office of Legacy Management’s (LM) Goal 4, “Optimize the use of land and assets,” is to establish environmentally sound and protective land...

  1. Geothermal Power Plants — Minimizing Land Use and Impact

    Broader source: Energy.gov [DOE]

    For energy production and development, geothermal power plants don't use much land compared to coal and nuclear power plants. And the environmental impact upon the land they use is minimal.

  2. Grout treatment facility land disposal restriction management plan

    SciTech Connect (OSTI)

    Hendrickson, D.W.

    1991-04-04

    This document establishes management plans directed to result in the land disposal of grouted wastes at the Hanford Grout Facilities in compliance with Federal, State of Washington, and Department of Energy land disposal restrictions. 9 refs., 1 fig.

  3. Oregon Department of State Lands | Open Energy Information

    Open Energy Info (EERE)

    of State Lands Name: Oregon Department of State Lands Address: 775 Summer Street, Suite 100 Place: Salem, Oregon Zip: 97301-1279 Phone Number: 503-986-5200 Website:...

  4. Leasing State Trust Lands in Washington | Open Energy Information

    Open Energy Info (EERE)

    Leasing State Trust Lands in Washington Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Leasing State Trust Lands in WashingtonLegal...

  5. NRS 322 - Use of State Lands | Open Energy Information

    Open Energy Info (EERE)

    2 - Use of State Lands Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: NRS 322 - Use of State LandsLegal Abstract This chapter...

  6. Soil fungal and bacterial responses to conversion of open land...

    Office of Scientific and Technical Information (OSTI)

    of open land to short-rotation woody biomass crops Citation Details In-Document Search ... of open land to short-rotation woody biomass crops Authors: Xue, Chao 1 ; Penton, ...

  7. Energy Department Releases New Land-Based/Offshore Wind Resource...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Releases New Land-BasedOffshore Wind Resource Map Energy Department Releases New Land-BasedOffshore Wind Resource Map May 1, 2012 - 2:23pm Addthis This is an excerpt from the ...

  8. File:03FDBTribalLandLeasing.pdf | Open Energy Information

    Open Energy Info (EERE)

    03FDBTribalLandLeasing.pdf Jump to: navigation, search File File history File usage Metadata File:03FDBTribalLandLeasing.pdf Size of this preview: 463 599 pixels. Other...

  9. File:03NVBStateLandAccess.pdf | Open Energy Information

    Open Energy Info (EERE)

    NVBStateLandAccess.pdf Jump to: navigation, search File File history File usage Metadata File:03NVBStateLandAccess.pdf Size of this preview: 463 599 pixels. Other resolution:...

  10. File:03FDAFederalLandLeasing.pdf | Open Energy Information

    Open Energy Info (EERE)

    03FDAFederalLandLeasing.pdf Jump to: navigation, search File File history File usage Metadata File:03FDAFederalLandLeasing.pdf Size of this preview: 463 599 pixels. Other...

  11. File:01LandUseOverview.pdf | Open Energy Information

    Open Energy Info (EERE)

    1LandUseOverview.pdf Jump to: navigation, search File File history File usage Metadata File:01LandUseOverview.pdf Size of this preview: 463 599 pixels. Other resolution: 464 ...

  12. H.R.S. 205 - Land Use | Open Energy Information

    Open Energy Info (EERE)

    5 - Land Use Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: H.R.S. 205 - Land UseLegal Published NA Year Signed or Took Effect...

  13. 31 TAC, Part 4, School Land Board | Open Energy Information

    Open Energy Info (EERE)

    School Land Board Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 31 TAC, Part 4, School Land BoardLegal Abstract Texas...

  14. Montana Natural Streambed and Land Preservation Act Webpage ...

    Open Energy Info (EERE)

    Streambed and Land Preservation Act Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Natural Streambed and Land Preservation Act Webpage...

  15. Title 36 CFR 251 Land Uses | Open Energy Information

    Open Energy Info (EERE)

    51 Land Uses Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 36 CFR 251 Land UsesLegal Abstract...

  16. Alaska Division of Mining Land and Water | Open Energy Information

    Open Energy Info (EERE)

    Mining Land and Water Jump to: navigation, search Name: Alaska Division of Mining Land and Water Address: 550 W. 7th Ave., Suite 1260 Place: Anchorage, Alaska Zip: 99501-3557 Phone...

  17. TNRC 51 - Land, Timber and Surface Resources | Open Energy Information

    Open Energy Info (EERE)

    51 - Land, Timber and Surface Resources Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: TNRC 51 - Land, Timber and Surface...

  18. Alaska Department of Natural Resources Land Use Planning Webpage...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library Web Site: Alaska Department of Natural Resources Land Use Planning Webpage Abstract This webpage provides an overview of Alaska's land use...

  19. Title 50 CFR 29 Land Use Management | Open Energy Information

    Open Energy Info (EERE)

    9 Land Use Management Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 50 CFR 29 Land Use ManagementLegal Abstract...

  20. Texas General Land Office - Rights of Way and Miscellaneous Easements...

    Open Energy Info (EERE)

    General Land Office - Rights of Way and Miscellaneous Easements Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Texas General Land Office - Rights of...

  1. Webtrends Archives by Fiscal Year — Topic Landing Pages

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the topic landing pages by fiscal year.

  2. Developing Clean Energy Projects on Tribal Lands: Data and Resources...

    Office of Scientific and Technical Information (OSTI)

    RENEWABLE ENERGY; TECHNOLOGY POTENTIAL; MAPS; WIND; SOLAR PHOTOVOLTAICS; HYDROELECTRICITY; GEOTHERMAL; CONCENTRATED SOLAR POWER; BIOMASS; TECHNICAL ASSISTANCE; TRIBAL LANDS; ...

  3. NREL: Energy Analysis - Renewable Energy on Contaminated Lands

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Renewable Energy on Contaminated Lands Map of U.S. Map of Potential Limbo Land Sites for Consideration for Renewable Energy Technology Development. Enlarge image NREL's sustainability analysis includes work with the Environmental Protection Agency (EPA) on the potential for using "limbo lands" as sites for renewable energy-generating stations. Limbo lands are considered underused, formerly contaminated sites; they include former Superfund sites, landfills, brownfields, abandoned mine

  4. Thermal performance simulation of a solar cavity receiver under windy conditions

    SciTech Connect (OSTI)

    Fang, J.B.; Wei, J.J.; Dong, X.W.; Wang, Y.S.

    2011-01-15

    Solar cavity receiver plays a dominant role in the light-heat conversion. Its performance can directly affect the efficiency of the whole power generation system. A combined calculation method for evaluating the thermal performance of the solar cavity receiver is raised in this paper. This method couples the Monte-Carlo method, the correlations of the flow boiling heat transfer, and the calculation of air flow field. And this method can ultimately figure out the surface heat flux inside the cavity, the wall temperature of the boiling tubes, and the heat loss of the solar receiver with an iterative solution. With this method, the thermal performance of a solar cavity receiver, a saturated steam receiver, is simulated under different wind environments. The highest wall temperature of the boiling tubes is about 150 C higher than the water saturation temperature. And it appears in the upper middle parts of the absorbing panels. Changing the wind angle or velocity can obviously affect the air velocity inside the receiver. The air velocity reaches the maximum value when the wind comes from the side of the receiver (flow angle {alpha} = 90 ). The heat loss of the solar cavity receiver also reaches a maximum for the side-on wind. (author)

  5. Microclimatic performance of a free-air warming and CO₂ enrichment experiment in windy Wyoming, USA

    SciTech Connect (OSTI)

    LeCain, Daniel; Smith, David; Morgan, Jack; Kimball, Bruce A.; Pendall, Elise; Miglietta, Franco; Liang, Wenju

    2015-02-06

    In order to plan for global changing climate experiments are being conducted in many countries, but few have monitored the effects of the climate change treatments (warming, elevated CO₂) on the experimental plot microclimate. During three years of an eight year study with year-round feedback-controlled infra-red heater warming (1.5/3.0°C day/night) and growing season free-air CO₂ enrichment (600 ppm) in the mixed-grass prairie of Wyoming, USA, we monitored soil, leaf, canopy-air, above-canopy-air temperatures and relative humidity of control and treated experimental plots and evaluated ecologically important temperature differentials. Leaves were warmed somewhat less than the target settings (1.1 & 1.5°C day/night) but soil was warmed more creating an average that matched the target settings extremely well both during the day and night plus the summer and winter. The site typically has about 50% bare or litter covered soil, therefore soil heat transfer is more critical than in dense canopy ecosystems. The Wyoming site commonly has strong winds (5 ms⁻¹ average) and significant daily and seasonal temperature fluctuations (as much as 30°C daily) but the warming system was nearly always able to maintain the set temperatures regardless of abiotic variation. The within canopy-air was only slightly warmed and above canopy-air was not warmed by the system, therefore convective warming was minor. Elevated CO₂ had no direct effect nor interaction with the warming treatment on microclimate. Relative humidity within the plant canopy was only slightly reduced by warming. Soil water content was reduced by warming but increased by elevated CO₂. This study demonstrates the importance of monitoring the microclimate in manipulative field global change experiments so that critical physiological and ecological conclusions can be determined. Highly variable energy demand fluctuations showed that passive IR heater warming systems will not maintain desired warming for much of the time.

  6. Microclimatic performance of a free-air warming and CO₂ enrichment experiment in windy Wyoming, USA

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    LeCain, Daniel; Smith, David; Morgan, Jack; Kimball, Bruce A.; Pendall, Elise; Miglietta, Franco; Liang, Wenju

    2015-02-06

    In order to plan for global changing climate experiments are being conducted in many countries, but few have monitored the effects of the climate change treatments (warming, elevated CO₂) on the experimental plot microclimate. During three years of an eight year study with year-round feedback-controlled infra-red heater warming (1.5/3.0°C day/night) and growing season free-air CO₂ enrichment (600 ppm) in the mixed-grass prairie of Wyoming, USA, we monitored soil, leaf, canopy-air, above-canopy-air temperatures and relative humidity of control and treated experimental plots and evaluated ecologically important temperature differentials. Leaves were warmed somewhat less than the target settings (1.1 & 1.5°C day/night)more » but soil was warmed more creating an average that matched the target settings extremely well both during the day and night plus the summer and winter. The site typically has about 50% bare or litter covered soil, therefore soil heat transfer is more critical than in dense canopy ecosystems. The Wyoming site commonly has strong winds (5 ms⁻¹ average) and significant daily and seasonal temperature fluctuations (as much as 30°C daily) but the warming system was nearly always able to maintain the set temperatures regardless of abiotic variation. The within canopy-air was only slightly warmed and above canopy-air was not warmed by the system, therefore convective warming was minor. Elevated CO₂ had no direct effect nor interaction with the warming treatment on microclimate. Relative humidity within the plant canopy was only slightly reduced by warming. Soil water content was reduced by warming but increased by elevated CO₂. This study demonstrates the importance of monitoring the microclimate in manipulative field global change experiments so that critical physiological and ecological conclusions can be determined. Highly variable energy demand fluctuations showed that passive IR heater warming systems will not maintain desired warming for much of the time.« less

  7. Reforesting Appalachia`s coal lands

    SciTech Connect (OSTI)

    Hopps, M.

    1994-11-01

    Currently, in those four states` primary coal counties, some 5,000 to 6,000 acres are surface-mined each year. Since 1977, when Congress passed the landmark Surface Mining Control and Reclamation Act (SMCRA), coal-mining companies have been required to refill the cuts they make and return the earth`s surface to approximately its original contours. Reclamation here means to aggressively-and literally-lay the groundwork for future cultivation of these lands. SMCRA calls for detailed reclamation plans before mining takes place, backed later by evaluations of how vegatation progresses up until the time of bond release-five years after mining ends. And though SMCRA has succeeded in improving the aesthetic appeal of post-mined sites, it does nothing to ensure that the most appropriate land use will be implemented for the long run.

  8. Quantitative Analysis of Biofuel Sustainability, Including Land Use Change

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GHG Emissions | Department of Energy Quantitative Analysis of Biofuel Sustainability, Including Land Use Change GHG Emissions Quantitative Analysis of Biofuel Sustainability, Including Land Use Change GHG Emissions Plenary V: Biofuels and Sustainability: Acknowledging Challenges and Confronting Misconceptions Quantitative Analysis of Biofuel Sustainability, Including Land Use Change GHG Emissions Jennifer B. Dunn, Energy Systems and Sustainability Analyst, Argonne National Laboratory

  9. Global Biofuels Modeling and Land Use

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biofuels Modeling and Land Use DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review Strategic Analysis & Cross-cutting Sustainability March 25 2015 Gbadebo Oladosu (PI) Oak Ridge National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information GOAL STATEMENT * Primary goal of the project is to demonstrate the viability of biofuels in the context of the national/global economy. * Metrics include: - Cost effectiveness:

  10. Mined land reclamation in Wisconsin since 1973

    SciTech Connect (OSTI)

    Hunt, T.C.

    1989-01-01

    Reclamation has long been recognized as an essential action necessary to mitigate the degradation of land caused by mining activities. But, it is only within the past several decades that reclamation has become an integral component of the mineral extraction process. While the Metallic Mining Reclamation Act (MMRA) was passed in 1973, Wisconsin is yet to enact comprehensive state-wide reclamation requirements for mining other than metallic minerals and the code for metallic mining has yet to establish procedures and standards for reclamation success, specifically revegetation and postmining land use. This study integrates several interdisciplinary methodologies including a history of reclamation; an inventory and status report of mined lands; a critique and comparison of existing reclamation policy with previous state and current federal reclamation policies; in-field case studies of revegetation parameters, procedures, and performance standards; and an economic analysis of reclamation technology. This study makes three major recommendations: (1) The metallic mining code should be amended to establish vegetation parameters, measuring methods, and performance standards for revegetation success similar to those contained in the federal Surface Mining Control and Reclamation Act (SMCRA); (2) The metallic mining code should be amended to resolve semantic loopholes by clearly defining the endpoints of terms such as restoration, reclamation, and rehabilitation and by utilizing the reclamation continuum as a planning tool for determining acceptable postmining land use alternatives; and (3) Mandatory statewide nonmetallic legislation should be enacted to strengthen the mineral resource management program in Wisconsin by systematically and uniformly regulating the mining and reclamation of nonmetallic minerals, the state's most important mineral resource.

  11. Land-Use Change Data Analysis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office (BETO) 2015 Project Peer Review 4.1.2.40 Land-Use Change Data Analysis 03/25/2015 Analysis & Sustainability Nagendra Singh (PI) Keith Kline, Rebecca Efroymson, Raju Vatsavai, Huina Mao, Erica Pham, Budhendra Bhaduri. Oak Ridge National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Presentation name Goal Statement Project Goal Design and develop scalable tools and assessment methods to establish scientific basis for

  12. Geothermal br Resource br Area Geothermal br Resource br Area...

    Open Energy Info (EERE)

    Aluto Langano Geothermal Area Aluto Langano Geothermal Area East African Rift System Ethiopian Rift Valley Major Normal Fault Basalt MW K Amatitlan Geothermal Area Amatitlan...

  13. Land Disposal Restrictions (LDR) program overview

    SciTech Connect (OSTI)

    Not Available

    1993-04-01

    The Hazardous and Solid Waste Amendments (HSWA) to the Resource Conservation and Recovery Act (RCRA) enacted in 1984 required the Environmental Protection Agency (EPA) to evaluate all listed and characteristic hazardous wastes according to a strict schedule and to develop requirements by which disposal of these wastes would be protective of human health and the environment. The implementing regulations for accomplishing this statutory requirement are established within the Land Disposal Restrictions (LDR) program. The LDR regulations (40 CFR Part 268) impose significant requirements on waste management operations and environmental restoration activities at DOE sites. For hazardous wastes restricted by statute from land disposal, EPA is required to set levels or methods of treatment that substantially reduce the waste`s toxicity or the likelihood that the waste`s hazardous constituents will migrate. Upon the specified LDR effective dates, restricted wastes that do not meet treatment standards are prohibited from land disposal unless they qualify for certain variances or exemptions. This document provides an overview of the LDR Program.

  14. Natural Areas Analysis and Evaluation: Oak Ridge Reservation

    SciTech Connect (OSTI)

    Baranski, Micahel J

    2009-11-01

    EXECUTIVE SUMMARY The Oak Ridge Reservation, encompassing 33,639 acres in the Valley and Ridge Physiographic Province of East Tennessee, has long been known for its unfragmented forests and high biodiversity. Many areas on the Reservation have been recognized as important natural areas, but no comprehensive treatment has been performed to evaluate the relative significance and importance of these areas compared to each other. The present study was conducted to develop a set of guidelines for evaluating the natural value of specific areas, to evaluate all the terrestrial areas that are currently delineated, and to rank all areas according to their relative biodiversity importance. All available data, reports and site-specific information relevant to Reservation lands, including Tennessee Division of Natural Areas database information, were evaluated and field work was conducted. Methodologies and criteria for assessment and evaluation of areas were developed; categories of criteria were devised; and a ranking system for evaluation of natural areas was produced. There were 70 areas evaluated during the study. The system is flexible, dynamic and easily revised to reflect updated and new information and interpretations. Eight categories of evaluation factors were established and used to characterize each site. These were the following: size of area, number or status taxa present, number of Endangered and Threatened taxa present, rarity of the Endangered and Threatened taxa on the Reservation, community diversity, site integrity and quality, disturbance and threat levels, and other significant features and factors. Each category generally consisted of a 5-point ranking scale from 0-4, allowing for a possible composite score of 32, with higher ranked, more important, sites attaining higher scores. Highly ranked sites are representative of regional natural diversity; contain outstanding natural features, communities or geology and/or very rare taxa or other elements; are

  15. Project Reports for Navajo Hopi Land Commission Office (NHLCO): Navajo Hopi Land Commission Office (NHLCO)- 2012 Project

    Broader source: Energy.gov [DOE]

    The Navajo Hopi Land Commission (NHLCO), together with its partners, will conduct a feasibility study (FS) of a program to develop renewable energy on the Paragon-Bisti ranch lands in northwestern New Mexico, which were set aside under the Navajo-Hopi Land Settlement Act for the benefit of relocatees (defined as Navajo families living on Hopi Partitioned Lands as of December 22, 1974).

  16. Parameterizing atmosphere-land surface exchange for climate models with satellite data: A case study for the Southern Great Plains CART site

    SciTech Connect (OSTI)

    Gao, W.

    1994-01-01

    High-resolution satellite data provide detailed, quantitative descriptions of land surface characteristics over large areas so that objective scale linkage becomes feasible. With the aid of satellite data, Sellers et al. and Wood and Lakshmi examined the linearity of processes scaled up from 30 m to 15 km. If the phenomenon is scale invariant, then the aggregated value of a function or flux is equivalent to the function computed from aggregated values of controlling variables. The linear relation may be realistic for limited land areas having no large surface contrasts to cause significant horizontal exchange. However, for areas with sharp surface contrasts, horizontal exchange and different dynamics in the atmospheric boundary may induce nonlinear interactions, such as at interfaces of land-water, forest-farm land, and irrigated crops-desert steppe. The linear approach, however, represents the simplest scenario, and is useful for developing an effective scheme for incorporating subgrid land surface processes into large-scale models. Our studies focus on coupling satellite data and ground measurements with a satellite-data-driven land surface model to parameterize surface fluxes for large-scale climate models. In this case study, we used surface spectral reflectance data from satellite remote sensing to characterize spatial and temporal changes in vegetation and associated surface parameters in an area of about 350 {times} 400 km covering the southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site of the US Department of Energy`s Atmospheric Radiation Measurement (ARM) Program.

  17. Decontamination & decommissioning focus area

    SciTech Connect (OSTI)

    1996-08-01

    In January 1994, the US Department of Energy Office of Environmental Management (DOE EM) formally introduced its new approach to managing DOE`s environmental research and technology development activities. The goal of the new approach is to conduct research and development in critical areas of interest to DOE, utilizing the best talent in the Department and in the national science community. To facilitate this solutions-oriented approach, the Office of Science and Technology (EM-50, formerly the Office of Technology Development) formed five Focus AReas to stimulate the required basic research, development, and demonstration efforts to seek new, innovative cleanup methods. In February 1995, EM-50 selected the DOE Morgantown Energy Technology Center (METC) to lead implementation of one of these Focus Areas: the Decontamination and Decommissioning (D & D) Focus Area.

  18. Using MCDA and GIS for hazardous waste landfill siting considering land scarcity for waste disposal

    SciTech Connect (OSTI)

    Feo, Giovanni De; Gisi, Sabino De

    2014-11-15

    Highlights: • Wasting land for the siting of hazardous waste landfills must be avoided. • The siting procedure is based on a land use map of potentially suitable areas. • All the waste facilities of the management system are simultaneously considered. • A case study is developed considering two multi-criteria techniques. • An innovative criteria weighting tool (PSW) is used in combination with the AHP. - Abstract: The main aim of this study was to develop a procedure that minimizes the wasting of space for the siting of hazardous waste landfills as part of a solid waste management system. We wanted to tackle the shortage of land for waste disposal that is a serious and growing problem in most large urban regions. The procedure combines a multi-criteria decision analysis (MCDA) approach with a geographical information system (GIS). The GIS was utilised to obtain an initial screening in order to eliminate unsuitable areas, whereas the MCDA was developed to select the most suitable sites. The novelty of the proposed siting procedure is the introduction of a new screening phase before the macro-siting step aimed at producing a “land use map of potentially suitable areas” for the siting of solid waste facilities which simultaneously takes into consideration all plant types. The issue of obtaining sites evaluations of a specific facility was coupled with the issue of not wasting land appropriate to facilitate other types of waste management options. In the developed case study, the use of an innovative criteria weighting tool (the “Priority Scale”) in combination with the Analytic Hierarchy Process was useful to easier define the priorities of the evaluation criteria in comparison with other classic methods such as the Paired Comparison Technique in combination with the Simple Additive Weighting method.

  19. Hanford 300 Area ROD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    300 Area ROD Briefing to the Hanford Advisory Board March 6, 2014 Larry Gadbois -- EPA Recap of the 300 Area ROD Primary new concept -- Uranium Sequestration: * Purpose: Accelerate restoration of groundwater uranium contamination. * Protect groundwater from downward leaching from the vadose zone (overlying soil). * Add phosphate to chemically bond with uranium into geologically stable autunite. Does not dissolve. * Dissolve phosphate in water, apply at ground surface, inject into the ground,

  20. Physics Thrust Areas

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thrust Areas Physics Thrust Areas Physics Division serves the nation through its broad portfolio of fundamental and applied research. Quality basic science research: critical component of maintaining our capabilities in national security research To further understand the physical world, generate new or improved technology in experimental physics, and establish a physics foundation for current and future Los Alamos programs, Physics Division leverages its expertise and experimental capabilities

  1. EIS-0222: Hanford Comprehensive Land-Use Plan

    Broader source: Energy.gov [DOE]

    DOE has prepared the EIS to evaluate the potential environmental impacts associated with implementing a comprehensive land-use plan (CLUP) for the Hanford Site for at least the next 50 years. DOE is expected to use this land-use plan in its decision-making process to establish what is the “highest and best use” of the land (41 Code of Federal Regulations [CFR] 101-47, “Federal Property Management Regulations”). The final selection of a land-use map, land-use policies, and implementing procedures would create the working CLUP when they are adopted through the ROD for the EIS.

  2. Land Use and Ecosystems Data from the Carbon Dioxide Information Analysis Center (CDIAC)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    CDIAC products are indexed and searchable through a customized interface powered by ORNL's Mercury search engine. Products include numeric data packages, publications, trend data, atlases, models, etc. and can be searched for by subject area, keywords, authors, product numbers, time periods, collection sites, spatial references, etc. Some of the collections may also be included in the CDIAC publication titled Trends Online: A Compendium of Global Change Data. Most data sets, many with numerous data files, are free to download from CDIAC's ftp area. Land Use and Ecosystems information includes Terrestrial Carbon Sequestration Data Sets, data sets from Africa and Asia, the Worldwide Organic Soil Carbon and Nitrogen Dataset, and much more.

  3. Land use change and carbon exchange in the tropics. I. Detailed estimates for Costa Rice, Panama, Peru, and Bolivia

    SciTech Connect (OSTI)

    Hall, C.A.S.; Detwiler, R.P.; Bogdonoff, P.; Underhill, S.

    1985-01-01

    This group, composed of modelers working in conjunction with tropical ecologists, has produced a simulation model that quantifies the net carbon exchange between tropical vegetation and the atmosphere due to land use change. The model calculates this net exchange by combining estimates of land use change with several estimates of the carbon stored in tropical vegetation and general assumptions about the fate of cleared vegetation. In this report, the authors use estimates of land use and carbon of land use and carbon storage organized into six life zone (sensu Holdridge) categories to calculate the exchange between the atmosphere and the vegetation of four tropical countries. Their analyses of these countries indicate that this life zone approach has several advantages because (a) the carbon content of vegetation varies significantly among life zones, (b) much of the land use change occurs in life zones of only moderate carbon storage, and (c) the fate of cleared vegetation varies among life zones. Their analyses also emphasize the importance of distinguishing between temporary and permanent land use change, as the recovery of vegetation on abandoned areas decreases the net release of carbon due to clearing. They include sensitivity analysis of those factors that they found to be important but are difficult to quantify at present.

  4. Solar Land Use Data on OpenEI | OpenEI Community

    Open Energy Info (EERE)

    Solar Land Use Data on OpenEI Home > Groups > OpenEI Community Central Sfomail's picture Submitted by Sfomail(48) Member 25 June, 2013 - 12:10 acres csp land use how much land land...

  5. Final Remediation Report for the K-Area Bingham Pump Outage Pit (643-1G)

    SciTech Connect (OSTI)

    Morganstern, M.

    2002-06-18

    The K-Area Bingham Pump Outage Pit (K BPOP) Building Number 643-1G, is situated immediately south and outside the K-Reactor fence line and is approximately 400 feet in length and 60 feet in width. For the K BPOP operable unit, the Land Use Control (LUC) objectives are to prevent contact, removal, or excavation of buried waste in the area and to preclude residential use of the area.

  6. Analysis of Renewable Energy Potential on U. S. National Forest Lands

    SciTech Connect (OSTI)

    Zvolanek, E.; Kuiper, J.; Carr, A.; Hlava, K.

    2013-12-13

    were found potentially suitable for CSP development, potentially yielding as much as 13,603 megawatts (MW) of electricity, assuming 10 acres per MW. For photovoltaic solar power (PV), the top NFS units were more widely distributed than CSP. Notably, more than 150,000 acres in Comanche National Grassland in Colorado were found to be potentially suitable for PV development, accounting for more than 25% of the potentially suitable NFS lands combined. In total, about 564,698 acres of NFS lands were found potentially suitable for PV development, potentially yielding as much as 56,469 MW of electricity, assuming 10 acres per MW. NFS units most suitable for wind power are concentrated in the northern Great Plains. In total, about 3,357,792 acres of NFS lands were found potentially suitable for wind development, potentially yielding as much as 67,156 MW of electricity, assuming 50 acres per MW. Of that area, 571,431 acres (11,429 MW) are located within the Bankhead-Jones Farm Tenant Act Land in Montana. NFS lands in Alaska have considerable wind resources, but other siting factors eliminated almost the entire area. The southwest coast of Chugach National Forest, near Seward, Alaska, maintains the majority of the remaining acreage. NFS units with highly suitable biomass resources are located from Idaho to Louisiana. In total, about 13,967,077 acres of NFS lands are potentially highly suitable for biomass from logging and thinning residue development. Of that, 1,542,247 acres is located in Fremont-Winema National Forest in Oregon. Not surprisingly, most NFS units have at least some level of potentially suitable biomass resources. In general, biomass resources such as these could significantly offset consumption of coal and petroleum-based fuels. NFS units deemed potentially highly suitable for enhanced geothermal system (EGS) development were distributed widely from California to Virginia, accounting for some 6,475,459 acres. Mark Twain National Forest in Missouri has the

  7. CX-011618: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Kremmling-Windy Gap 138-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  8. Economic and Technical Feasibility Study of Utility-Scale Wind Generation for the New York Buffalo River and South Buffalo Brownfield Opportunity Areas

    SciTech Connect (OSTI)

    Roberts, J. O.; Mosey, G.

    2014-04-01

    Through the RE-Powering America's Land initiative, the economic and technical feasibility of utilizing contaminated lands in the Buffalo, New York, area for utility-scale wind development is explored. The study found that there is available land, electrical infrastructure, wind resource, and local interest to support a commercial wind project; however, economies of scale and local electrical markets may need further investigation before significant investment is made into developing a wind project at the Buffalo Reuse Authority site.

  9. OLED area illumination source

    DOE Patents [OSTI]

    Foust, Donald Franklin; Duggal, Anil Raj; Shiang, Joseph John; Nealon, William Francis; Bortscheller, Jacob Charles

    2008-03-25

    The present invention relates to an area illumination light source comprising a plurality of individual OLED panels. The individual OLED panels are configured in a physically modular fashion. Each OLED panel comprising a plurality of OLED devices. Each OLED panel comprises a first electrode and a second electrode such that the power being supplied to each individual OLED panel may be varied independently. A power supply unit capable of delivering varying levels of voltage simultaneously to the first and second electrodes of each of the individual OLED panels is also provided. The area illumination light source also comprises a mount within which the OLED panels are arrayed.

  10. Operational Area Monitoring Plan

    Office of Legacy Management (LM)

    ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan

  11. DEBRIEF OF CENTRAL PLATEAU INNER AREA PRINCIPLES Questions:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DEBRIEF OF CENTRAL PLATEAU INNER AREA PRINCIPLES Questions:  What is the definition for industrial vs residential land use?  Are the local DOE office(s) and HQ in agreement about what needs to be done?  Concerning the new ideas for characterization (bullet 3), how does HAB present ideas, how much detail is required, and how does the HAB know if these ideas have been considered earlier?  What is the difference between MTCA -B and -C level cleanup as applied to the Inner Area?  What

  12. Interagency Visitor Center at Santa Monica Mountains National Recreation Area

    High Performance Buildings Database

    Calabasas, CA This project was to develop the first visitor center for the Santa Monica Mountains National Recreation Area located in the Los Angeles, California area. The previous visitor center was across from a shopping mall in rental space at park headquarters in Thousand Oaks. The new facility is centrally located in the park at a much more appropriate natural and cultural resource setting. It is a partnership project with the Mountains Recreation and Conservation Authority, which is a local land conservation and park agency. It is also a joint facility with California State Parks.

  13. Marine and Land Active-Source Seismic

    Office of Scientific and Technical Information (OSTI)

    Marine and Land Active-Source Seismic Imaging of mid-Miocene to Holocene-aged Faulting near Geothermal Prospects at Pyramid Lake, Nevada Amy Eisses1-3, Annie Kell1'3, Graham Kent1-3, Neal Driscoll2, Robert Karlin3, Rob Baskin4, John Louie1-3, and Satish Pullammanappallil5 1. Nevada Seismological Laboratory, University of Nevada, Reno; eissesa@gmail.com 2. Scripps Institute of Oceanography, University of California, San Diego 3. Department of Geological Sciences and Engineering, University of

  14. Green Lands Blue Water 2014 Fall Conference

    Broader source: Energy.gov [DOE]

    The Green Lands Blue Water 2014 Fall Conference will be held from November 19–20, 2014, at the Richland Community College in Decatur, Illinois. The event will focus on bioenergy and sustainable agriculture and explore topics ranging from logistics, energy conversion technologies, and markets for grass biomass. BETO Sustainability Program Technology Manager Kristen Johnson will be speaking about the Energy Department’s perspective on sustainable bioenergy landscapes and will focus on BETO’s recent work with landscape design. The conference will be November 19–20 only. On November 18, participants may choose to participate in a pre-conference field tour.

  15. Proceedings: Special session on the rehabilitation of US Army Training Lands, Second Annual Conference of the Society for Ecological Restoration, held in Chicago, Illinois, April 29--May 3, 1990

    SciTech Connect (OSTI)

    Hinchman, R.R.

    1993-05-01

    US Army lands are currently being degraded at a rate that often exceeds natural resource conservation goals. The US Army Construction Engineering Research Laboratories is developing and implementing the Integrated Training Area Management (ITAM) program at several installations in the United States and Germany to reverse the rate of degradation and maintain realistic training habitat. The ITAM program includes environmental education/awareness tools, revegetation and erosion-control technologies, standardized land-monitoring methodologies, and computerized land-management decision-support systems that are integrated with military training mission requirements to provide a long-term, land-management program.

  16. Site Monitoring Area Maps

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The spatial location and boundaries for each Site shown on the Site Monitoring Area maps ... P-SMA-2 DP-SMA-0.4 LA-SMA-2.3 LA-SMA-5.51 LA-SMA-6.38 P-SMA-2.15 DP-SMA-0.6 ...

  17. Plutonium focus area

    SciTech Connect (OSTI)

    1996-08-01

    To ensure research and development programs focus on the most pressing environmental restoration and waste management problems at the U.S. Department of Energy (DOE), the Assistant Secretary for the Office of Environmental Management (EM) established a working group in August 1993 to implement a new approach to research and technology development. As part of this new approach, EM developed a management structure and principles that led to the creation of specific Focus Areas. These organizations were designed to focus the scientific and technical talent throughout DOE and the national scientific community on the major environmental restoration and waste management problems facing DOE. The Focus Area approach provides the framework for intersite cooperation and leveraging of resources on common problems. After the original establishment of five major Focus Areas within the Office of Technology Development (EM-50, now called the Office of Science and Technology), the Nuclear Materials Stabilization Task Group (EM-66) followed the structure already in place in EM-50 and chartered the Plutonium Focus Area (PFA). The following information outlines the scope and mission of the EM, EM-60, and EM-66 organizations as related to the PFA organizational structure.

  18. Subsurface contaminants focus area

    SciTech Connect (OSTI)

    1996-08-01

    The US Department of Enregy (DOE) Subsurface Contaminants Focus Area is developing technologies to address environmental problems associated with hazardous and radioactive contaminants in soil and groundwater that exist throughout the DOE complex, including radionuclides, heavy metals; and dense non-aqueous phase liquids (DNAPLs). More than 5,700 known DOE groundwater plumes have contaminated over 600 billion gallons of water and 200 million cubic meters of soil. Migration of these plumes threatens local and regional water sources, and in some cases has already adversely impacted off-site rsources. In addition, the Subsurface Contaminants Focus Area is responsible for supplying technologies for the remediation of numerous landfills at DOE facilities. These landfills are estimated to contain over 3 million cubic meters of radioactive and hazardous buried Technology developed within this specialty area will provide efective methods to contain contaminant plumes and new or alternative technologies for development of in situ technologies to minimize waste disposal costs and potential worker exposure by treating plumes in place. While addressing contaminant plumes emanating from DOE landfills, the Subsurface Contaminants Focus Area is also working to develop new or alternative technologies for the in situ stabilization, and nonintrusive characterization of these disposal sites.

  19. Defining a future conservation strategy for Department of Defense (DoD) lands

    SciTech Connect (OSTI)

    Boice, L.P.

    1995-12-01

    The Department of Defense (DoD) is steward for nearly 25 million acres of public land. These lands often harbor important populations of threatened and endangered species, significant ecological areas, and important cultural resources. Protected by security requirements and the need for buffer zones, DoD lands are the only significant undeveloped areas in many regions. The goal of DoD`s Conservation program is to provide a healthy coexistence between protecting important natural and cultural resources and supporting the readiness requirements of the military mission. Although this can be difficult task, DoD is committed to ensuring that its military installations have inventories and plans for managing these resources in a coordinated, comprehensive manner. This past year, the Department adopted ecosystem management principles and guidelines to better integrate economic, social, and environmental concerns in its resource management program. In addition, the Department initiated several important studies which will help define in future resource management goals. This presentation will summarize the results to date of several cooperative partnership efforts.

  20. Final Report for ''SOURCES AND SINKS OF CARBON FROM LAND-USE CHANGE AND MANAGEMENT: A GLOBAL SYNTHESIS'' Project Period September 15, 2001--September 14, 2003

    SciTech Connect (OSTI)

    Houghton, R.A.

    2003-12-12

    Land management and land-use change can either release carbon (as CO{sub 2}) to the atmosphere, for example when forests are converted to agricultural lands, or withdraw carbon from the atmosphere as forests grow on cleared lands or as management practices sequester carbon in soil. The purpose of this work was to calculate the annual sources and sinks of carbon from changes in land use and management, globally and for nine world regions, over the period 1850 to 2000. The approach had three components. First, rates of land-use change were reconstructed from historical information on the areas of croplands, pastures, forests, and other lands and from data on wood harvests. In most regions, land-use change included the conversion of natural ecosystems to cultivated lands and pastures, including shifting cultivation, harvest of wood (for timber and fuel), and the establishment of tree plantations. In the U.S., woody encroachment and woodland thickening as a result of fire suppression were also included. Second, the amount of carbon per hectare in vegetation and soils and changes in that carbon as a result of land-use change were determined from data obtained in the ecological and forestry literature. These data on land-use change and carbon stocks were then used in a bookkeeping model (third component) to calculate regional and global changes in terrestrial carbon. The results indicate that for the period 1850-2000 the net flux of carbon from changes in land use was 156 PgC. For comparison, emissions of carbon from combustion of fossil fuels were approximately 280 PgC during the same interval. Annual emissions from land-use change exceeded emissions from fossil fuels before about 1920. Somewhat more that half (60%) of the long-term flux was from the tropics. Average annual fluxes during the 1980s and 1990s were 2.0 and 2.2 ({+-}0.8) PgC yr{sup -1} (30-40% of fossil fuel emissions), respectively. In these decades, the global sources of carbon were almost entirely from

  1. Baselines For Land-Use Change In The Tropics: Application ToAvoided Deforestation Projects

    SciTech Connect (OSTI)

    Brown, Sandra; Hall, Myrna; Andrasko, Ken; Ruiz, Fernando; Marzoli, Walter; Guerrero, Gabriela; Masera, Omar; Dushku, Aaron; Dejong,Ben; Cornell, Joseph

    2007-06-01

    Although forest conservation activities particularly in thetropics offer significant potential for mitigating carbon emissions,these types of activities have faced obstacles in the policy arena causedby the difficulty in determining key elements of the project cycle,particularly the baseline. A baseline for forest conservation has twomain components: the projected land-use change and the correspondingcarbon stocks in the applicable pools such as vegetation, detritus,products and soil, with land-use change being the most difficult toaddress analytically. In this paper we focus on developing and comparingthree models, ranging from relatively simple extrapolations of pasttrends in land use based on simple drivers such as population growth tomore complex extrapolations of past trends using spatially explicitmodels of land-use change driven by biophysical and socioeconomicfactors. The three models of the latter category used in the analysis atregional scale are The Forest Area Change (FAC) model, the Land Use andCarbon Sequestration (LUCS) model, and the Geographical Modeling (GEOMOD)model. The models were used to project deforestation in six tropicalregions that featured different ecological and socioeconomic conditions,population dynamics, and uses of the land: (1) northern Belize; (2) SantaCruz State, Bolivia; (3) Parana State in Brazil; (4) Campeche, Mexico;(5) Chiapas, Mexico; and (6) Michoacan, Mexico. A comparison of all modeloutputs across all six regions shows that each model produced quitedifferent deforestation baseline. In general, the simplest FAC model,applied at the national administrative-unit scale, projected the highestamount of forest loss (four out of six) and the LUCS model the leastamount of loss (four out of five). Based on simulations of GEOMOD, wefound that readily observable physical and biological factors as well asdistance to areas of past disturbance were each about twice as importantas either sociological/demographic or economic

  2. Italy to open exclusive Po basin area in 1992

    SciTech Connect (OSTI)

    Rigo, F.

    1991-05-27

    Under new regulations of the European Community, no oil and gas state monopoly is allowed in the member countries. As a consequence, by 1992 Italy will open for application by international oil companies all lands not covered by exploitation concessions in the ENI exclusive area. This monopoly area covers the prolific Po basin, the cradle of the Italian state oil company AGIP SpA, Milan. Due to profits derived from numerous gas discoveries of the 1950s in this basin, AGIP, a relatively small enterprise at that time, could eventually afford to expand in Italy and abroad and through successful exploration achieve status of a major international oil company. The ENI exclusive area covers the Po and Veneto plains and adjacent 15 km of territorial waters, for a total surface of more than 23,000 sq miles. The area to become available for exploration will be regulated by the Italian petroleum law, for one of the most favorable in the world.

  3. Property:AreaGeology | Open Energy Information

    Open Energy Info (EERE)

    Geothermal Area B Beowawe Hot Springs Geothermal Area Blue Mountain Geothermal Area Brady Hot Springs Geothermal Area C Chena Geothermal Area Coso Geothermal Area D Desert Peak...

  4. Cost analysis of aerial photographic and satellite imagery for monitoring mined land reclamation

    SciTech Connect (OSTI)

    Green, J.E.; Buschur, J.P.

    1980-12-01

    Five sections of the Surface Mining Control and Reclamation Act of 1977 require information that is easily and efficiently obtainable by aerial photographic and remote sensing methods. Most states in which mining is important and to which the Act most specifically applies, maintain or have available to them aerial photographic or remotely sensed information of the type required. This information could be used to meet the requirements of the Act which call for monitoring reclamation progress, identifying land areas unsuitable for mining and determining land use prior to mining to name a few examples. At the regional scale, LANDSAT imagery of a scale of 1:250,000 provides a good combination of aerial coverage and detail for regional problem solving. At the local scale, such coverage as is provided by the Agricultural Stabilization and Conservation Service through their aerial observation method of compliance technique can supply local, detailed information to meet site specific needs.

  5. LandScan 2013 High Resolution Global Population Data Set

    SciTech Connect (OSTI)

    2014-07-01

    The LandScan data set is a worldwide population database compiled on a 30"x30" latitude/longitude grid. Census counts (at sub-national level) were apportioned to each grid cell based on likelihood coefficients, which are based on land cover, slope, road proximity, high-resolution imagery, and other data sets. The LandScan data set was developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient populations at risk.

  6. EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transfers; McCracken County, Kentucky | Department of Energy 27: Paducah Gaseous Diffusion Plant Potential Land and Facilities Transfers; McCracken County, Kentucky EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities Transfers; McCracken County, Kentucky SUMMARY DOE's Portsmouth/Paducah Project Office prepared an EA that assesses the potential environmental impacts of the proposed transfer of land and facilities at the Paducah Gaseous Diffusion Plant from DOE to other

  7. Coordination of Federal Transmission Permitting on Federal Lands (216(h)) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Planning » Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve coordination among project applicants, federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land.

  8. INL Comprehensive Land Use and Environmental Stewardship Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    INL Comprehensive Land Use and Environmental Stewardship Report The Idaho National Laboratory announced recently that the Comprehensive Land Use and Environmental Stewardship (CLUES) Report for Fiscal Year 2011 has been finalized. The CLUES Report compliments the INL Ten Year Site Plan and provides a look ahead to INL facilities 10, 30 and 100 years into the future. The CLUES Report discusses how land on the INL will be managed and the process for reviewing requests. The report represents a

  9. Assessing the health risk of solar development on contaminated lands |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argonne National Laboratory Assessing the health risk of solar development on contaminated lands December 11, 2013 Tweet EmailPrint A recently published report from Argonne's Environmental Science (EVS) division presents a methodology for assessing potential human health risks of developing utility-scale solar facilities on contaminated, previously developed sites. Developing on these lands rather than pristine, undeveloped lands can avoid or minimize environmental impacts, reduce

  10. Approaches used for Clearance of Lands from Nuclear Facilities among

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Several Countries: Evaluation for Regulatory Input | Department of Energy Approaches used for Clearance of Lands from Nuclear Facilities among Several Countries: Evaluation for Regulatory Input Approaches used for Clearance of Lands from Nuclear Facilities among Several Countries: Evaluation for Regulatory Input The study entitled, "Approaches used for Clearance of Lands from Nuclear Facilities among Several Countries: Evaluation for Regulatory Input," focuses on the issue of

  11. NERSC Calculations Provide Independent Confirmation of Global Land Warming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Since 1901 Calculations Provide Independent Confirmation of Global Land Warming Since 1901 NERSC Calculations Provide Independent Confirmation of Global Land Warming Since 1901 September 9, 2013 Contact: Jon Bashor, jbashor@lbl.gov, 510-486-5849 campo.jpg These maps show the changes in air temperatures over land as measured using thermometers (left side) and as calculated by the 20th Century Reanalysis project (left side). While more than 80 percent of the observed variation is captured by

  12. LandScan 2003 High Resolution Global Population Data Set

    Energy Science and Technology Software Center (OSTI)

    2004-01-01

    The LandScan data set is a worldwide population database compiled on a 30" x 30" latitude/longitude grid. Census counts (at sub-national level) were apportioned to each grid cell based on likelihood coefficients, which are based on proximity to roads, slope, land cover, nighttime lights, and other data sets. LandScan 2001 has been developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient population risk.

  13. LandScan 2004 High Resolution Global Population Data Set

    Energy Science and Technology Software Center (OSTI)

    2005-01-01

    The LandScan data set is a worldwide population database compiled on a 30" x 30" latitude/longitude grid. Census counts (at sub-national level) were apportioned to each grid cell based on likelihood coefficients, which are based on proximity to roads, slope, land cover, nighttime lights, and other data sets. LandScan 2001 has been developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient population risk.

  14. LandScan 2000 High Resolution Global Population Data Set

    Energy Science and Technology Software Center (OSTI)

    2001-12-31

    The LandScan data set is a worldwide population database compiled on a 30" X 30" latitude/longitude grid. Census counts (at sub-national level) were apportioned to each grid cell based on likelihood coefficients, which are based on proximity to roads, slope, land cover, nighttime lights, and other data sets. The LandScan data set was developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient populations at risk.

  15. LandScan 2002 High Resolution Global Population Data Set

    Energy Science and Technology Software Center (OSTI)

    2003-01-01

    The LandScan data set is a worldwide population database compiled on a 30" x 30" latitude/longitude grid. Census counts (at sub-national level) were apportioned to each grid cell based on likelihood coefficients, which are based on proximity to roads, slope, land cover, nighttime lights, and other data sets. LandScan 2001 has been developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient population risk.

  16. LandScan 2006 High Resolution Global Population Data Set

    Energy Science and Technology Software Center (OSTI)

    2006-01-01

    The LandScan data set is a worldwide population database compiled on a 30" x 30" latitude/longitude grid. Census counts (at sub-national level) were apportioned to each grid cell based on likelihood coefficients, which are based on proximity to roads, slope, land cover, nighttime lights, and other data sets. LandScan 2001 has been developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient population risk.

  17. LandScan 2005 High Resolution Global Population Data Set

    Energy Science and Technology Software Center (OSTI)

    2006-01-01

    The LandScan data set is a worldwide population database compiled on a 30" x 30" latitude/longitude grid. Census counts (at sub-national level) were apportioned to each grid cell based on likelihood coefficients, which are based on proximity to roads, slope, land cover, nighttime lights, and other data sets. LandScan 2001 has been developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient population risk.

  18. LandScan 2009 High Resolution Global Population Data Set

    Energy Science and Technology Software Center (OSTI)

    2009-07-01

    The LandScan data set is a worldwide population database compiled on a 30" x 30" latitude/longitude grid. Census counts (at sub-national level) were apportioned to each grid cell based on likelihood coefficients, which are based on proximity to roads, slope, land cover, nighttime lights, and other data sets. LandScan 2001 has been developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient population risk.

  19. LandScan 2007 High Resolution Global Population Data Set

    Energy Science and Technology Software Center (OSTI)

    2008-01-01

    The LandScan data set is a worldwide population database compiled on a 30" x 30" latitude/longitude grid. Census counts (at sub-national level) were apportioned to each grid cell based on likelihood coefficients, which are based on proximity to roads, slope, land cover, nighttime lights, and other data sets. LandScan 2001 has been developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient population risk.

  20. LandScan 2011 High Resolution Global Population Data Set

    Energy Science and Technology Software Center (OSTI)

    2012-11-19

    The LandScan data set is a worldwide population database compiled on a 30" x 30" latitude/longitude grid. Census counts (at sub-national level) were apportioned to each grid cell based on likelihood coefficients, which are based on proximity to roads, slope, land cover, nighttime lights, and other data sets. LandScan 2001 has been developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient population risk.

  1. LandScan 2010 High Resolution Global Population Data Set

    Energy Science and Technology Software Center (OSTI)

    2010-07-01

    The LandScan data set is a worldwide population database compiled on a 30" x 30" latitude/longitude grid. Census counts (at sub-national level) were apportioned to each grid cell based on likelihood coefficients, which are based on proximity to roads, slope, land cover, nighttime lights, and other data sets. LandScan 2001 has been developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient population risk.

  2. LandScan 2008 High Resolution Global Population Data Set

    Energy Science and Technology Software Center (OSTI)

    2009-01-01

    The LandScan data set is a worldwide population database compiled on a 30" x 30" latitude/longitude grid. Census counts (at sub-national level) were apportioned to each grid cell based on likelihood coefficients, which are based on proximity to roads, slope, land cover, nighttime lights, and other data sets. LandScan 2001 has been developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient population risk.

  3. Accuracy Assessment for Forest and Land Use Maps (English version...

    Open Energy Info (EERE)

    www.leafasia.orglibraryusaid-leaf-accuracy-assessment-forest-and-lan Cost: Free Language: English Accuracy Assessment for Forest and Land Use Maps (English version)...

  4. Holistic Interactions of Shallow Clouds, Aerosols, and Land-Ecosystems...

    Office of Scientific and Technical Information (OSTI)

    Cumulus convection is an important component in the atmospheric radiation budget and ... when intense turbulence induced by surface radiation couples the land surface to clouds. ...

  5. PIA - Land Record System (SWPA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PIA - Land Record System (SWPA) (250.65 KB) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change ...

  6. Vermont FPR: Land and Water Conservation Fund | Open Energy Informatio...

    Open Energy Info (EERE)

    provides information on the Vermont Department of Forest, Parks and Recreation's administration of the Land and Water Conservation Fund. Published Publisher Not Provided, Date...

  7. Administration of State Lands Interagency MOA July 2012 | Open...

    Open Energy Info (EERE)

    Parks and Recreation; Department of Environmental Conservation; and Department of Fish and Wildlife, with respect to agency administration of State lands. Authors FPR, DEC...

  8. Sales of Fossil Fuels Produced from Federal and Indian Lands...

    Gasoline and Diesel Fuel Update (EIA)

    maplayers.html?openChapterschpboundchpbound Four agencies-the National Park Service, Fish and Wildlife Service, and Bureau of Land Management (BLM), in the Department of the...

  9. Assessment of Land Surface Model Performance in WRF for Simulating...

    Office of Scientific and Technical Information (OSTI)

    Assessment of Land Surface Model Performance in WRF for Simulating Wind at Heights Relevant to the Wind Energy Community Citation Details In-Document Search Title: Assessment of ...

  10. Wyoming Office of State Lands and Investments | Open Energy Informatio...

    Open Energy Info (EERE)

    Investments Jump to: navigation, search Name: Wyoming Office of State Lands and Investments Abbreviation: OSLI Address: 122 West 25th Street 3W Place: Cheyenne, Wyoming Zip: 82001...

  11. 2 CCR State Lands Commission Article 1, General Provisions |...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 2 CCR State Lands Commission Article 1, General ProvisionsLegal Abstract California...

  12. Low-Carbon Land Transport Policy Handbook | Open Energy Information

    Open Energy Info (EERE)

    Policy Handbook Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Low-Carbon Land Transport Policy Handbook AgencyCompany Organization: Routledge ComplexityEase...

  13. Hawaii Department of Land and Natural Resources Engineering Division...

    Open Energy Info (EERE)

    Land Leasing Contact Contacts.png Morriss Atta Chief Engineer Contacts.png Carty Chang http:hawaii.govdlnreng Retrieved from "http:en.openei.orgw...

  14. Bureau of Land Management - NEPA Handbook | Open Energy Information

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - GuideHandbook: Bureau of Land Management - NEPA HandbookPermittingRegulatory GuidanceGuideHandbook Abstract The purpose of...

  15. Bureau of Land Management - WO-210 - Contact Information | Open...

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - WO-210 - Contact Information Abstract This page provides contact information for...

  16. Bureau of Land Management - Notice of Intent to Conduct Geothermal...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Form: Bureau of Land Management - Notice of Intent to Conduct Geothermal Resource Exploration Operations Abstract...

  17. Bureau of Land Management - Washington Office Directories | Open...

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library General: Bureau of Land Management - Washington Office Directories Abstract This page links to a directory for state...

  18. Federal Land Policy and Management Act of 1976 (FLPMA) | Open...

    Open Energy Info (EERE)

    Legal Document- Federal RegulationFederal Regulation: Federal Land Policy and Management Act of 1976 (FLPMA)Legal Abstract FLPMA, also called the BLM Organic Act,...

  19. Bureau of Land Management - Examples of Scoping Reports | Open...

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - Supplemental Material: Bureau of Land Management - Examples of Scoping ReportsPermittingRegulatory GuidanceSupplemental Material...

  20. Bureau of Land Management, Colorado collaborate to advance efficient...

    Open Energy Info (EERE)

    Management, Colorado collaborate to advance efficient geothermal development Jump to: navigation, search OpenEI Reference LibraryAdd to library Memorandum: Bureau of Land...

  1. Land and Facility Use Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Each comprehensive plan will consider the site's larger regional context and be developed with stakeholder participation. This policy will result in land and facility uses which ...

  2. Assessment of Land Surface Model Performance in WRF for Simulating...

    Office of Scientific and Technical Information (OSTI)

    Wind Energy Community Citation Details In-Document Search Title: Assessment of Land Surface Model Performance in WRF for Simulating Wind at Heights Relevant to the Wind Energy ...

  3. Title 40 CFR 268 Land Disposal Restrictions | Open Energy Information

    Open Energy Info (EERE)

    disposal and defines those limited circumstances under which an otherwise prohibited waste may continue to be land disposed. Except as specifically provided otherwise in this...

  4. Analysis of Impacts on Prime or Unique Agricultural Lands in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Analysis of Impacts on Prime or Unique Agricultural Lands in Implementing the National Environmental Policy Act was developed in cooperation with the Department of Agriculture. ...

  5. Geothermal Leasing 101: Federal, State and Private Lands | Open...

    Open Energy Info (EERE)

    and Private LandsLegal Abstract Comprehensive guide to geothermal leasing, prepared by a law firm. Published NA Year Signed or Took Effect 2009 Legal Citation Geothermal Leasing...

  6. RAPID/Solar/Land Access | Open Energy Information

    Open Energy Info (EERE)

    RAPIDSolarLand Access < RAPID | Solar(Redirected from RAPIDSolarLeasing) Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About...

  7. Office of State Lands and Investments - Easements | Open Energy...

    Open Energy Info (EERE)

    - Easements Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Office of State Lands and Investments - Easements Abstract This web page contains...

  8. Oregon Land Use Compatibility Statements Website | Open Energy...

    Open Energy Info (EERE)

    Statements Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Land Use Compatibility Statements Website Author Oregon Department of...

  9. Bureau of Land Management - Resource Advisory Councils | Open...

    Open Energy Info (EERE)

    Advisory Councils Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - Resource Advisory Councils Abstract The BLM formed...

  10. USGS-Land Cover Institute (LCI) | Open Energy Information

    Open Energy Info (EERE)

    USGS currently houses the institute at the Center for Earth Resources Observation and Science (EROS) in Sioux Falls, South Dakota. The LCI will address land cover topics from...

  11. Land Use and Water Efficiency in Current and Potential Future...

    Office of Scientific and Technical Information (OSTI)

    Ethanol Systems (Poster) Citation Details In-Document Search Title: Land Use and Water Efficiency in Current and Potential Future U.S. Corn and Brazilian Sugarcane Ethanol ...

  12. Oregon Land Conservation and Development Commission | Open Energy...

    Open Energy Info (EERE)

    Commission Abbreviation: LCDC Place: Portland, Oregon Website: www.oregon.govLCDpageslcdc. References: Oregon Department of Land Conservation and Development1 This...

  13. Alaska Department of Natural Resources Land Records Search Portal...

    Open Energy Info (EERE)

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Alaska Department of Natural Resources Land Records Search Portal Citation...

  14. Bureau of Land Management - Examples of Decision Records | Open...

    Open Energy Info (EERE)

    BLM, 2011 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Bureau of Land Management - Examples of Decision Records Citation BLM....

  15. Texas General Land Office Local Permitting Authorities Webpage...

    Open Energy Info (EERE)

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Texas General Land Office Local Permitting Authorities Webpage Citation...

  16. Approaches used for Clearance of Lands from Nuclear Facilities...

    Broader source: Energy.gov (indexed) [DOE]

    for Clearance of Lands from Nuclear Facilities among Several Countries: Evaluation for Regulatory Input," focuses on the issue of showing compliance with given clearance levels ...

  17. Land and Asset Transfer for Beneficial Reuse | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Land and Asset Transfer for Beneficial Reuse More Documents & Publications EA-0531: Final Environmental Assessment EIS-0068: Final Environmental Impact Statement EA-1008: ...

  18. Alaska Department of Natural Resources Land Search Records Webpage...

    Open Energy Info (EERE)

    Records Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Alaska Department of Natural Resources Land Search Records Webpage Abstract This...

  19. Analysis of Impacts on Prime or Unique Agricultural Lands in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    previous memorandum on this subject of August 1976. PDF icon AnalysisAgriculturalLands.pdf More Documents & Publications Mini-Guidance Articles from Lessons Learned Quarterly...

  20. Holistic Interactions of Shallow Clouds, Aerosols, and Land-Ecosystems...

    Office of Scientific and Technical Information (OSTI)

    and over many regions of the world, particularly during the summertime growing season when intense turbulence induced by surface radiation couples the land surface to clouds. ...

  1. Colorado - Rights of Way on State Trust Lands - General Information...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Colorado - Rights of Way on State Trust Lands - General InformationPermitting...

  2. LAND USE AND ECOLOGICAL IMPACTS FROM SHALE DEVELOPMENT IN THE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LAND USE AND ECOLOGICAL IMPACTS FROM SHALE DEVELOPMENT IN THE APPALACHIANS THE NATURE ... Research by The Nature Conservancy (Johnson et al. 2010; Johnson et al. 2011) indicates ...

  3. Geothermal Regulations in Colorado - Land Ownership is the Key...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Geothermal Regulations in Colorado - Land Ownership is the Key Abstract Geothermal resources in...

  4. RAPID/Geothermal/Land Access/Hawaii | Open Energy Information

    Open Energy Info (EERE)

    Basis: Royalty Distribution: ContactsAgencies: Hawaii Department of Land and Natural Resources, Hawaii Department of Transportation Highways Division, Hawaii Department...

  5. RAPID/Geothermal/Land Access/Washington | Open Energy Information

    Open Energy Info (EERE)

    Basis: Royalty Distribution: ContactsAgencies: Washington State Department of Natural Resources, Washington State Department of Transportation State Land Access Process In...

  6. RAPID/Geothermal/Land Access | Open Energy Information

    Open Energy Info (EERE)

    RAPIDGeothermalLand Access < RAPID | Geothermal(Redirected from RAPIDGeothermalLeasing) Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop...

  7. Mineral Leasing Act for Acquired Lands of 1947 | Open Energy...

    Open Energy Info (EERE)

    of the Mineral Leasing Act and the authority of the Secretary of the Interior over oil and gas operations to federal "acquired lands." References Mineral Leasing Act for...

  8. Atmosphere-Land-Surface Interaction over the Southern Great Plains...

    Office of Scientific and Technical Information (OSTI)

    Plains: Diagnosis of Mechanisms from SGP ARM Data Citation Details In-Document Search Title: Atmosphere-Land-Surface Interaction over the Southern Great Plains: Diagnosis of ...

  9. Oregon Land Use Compatibility Statement for Onsite Wastewater...

    Open Energy Info (EERE)

    Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Oregon Land Use Compatibility Statement for Onsite Wastewater Treatment System Permits Abstract...

  10. Hawaii Department of Land and Natural Resources Historic Preservation...

    Open Energy Info (EERE)

    Historic Preservation Division Jump to: navigation, search Name: Hawaii Department of Land and Natural Resources Historic Preservation Division Address: Kakuhihewa Building601...

  11. Hawaii Department of Land and Natural Resources Division of Forestry...

    Open Energy Info (EERE)

    of Forestry and Wildlife Jump to: navigation, search Name: Hawaii Department of Land and Natural Resources Division of Forestry and Wildlife Address: Kalanimoku Building...

  12. Hawaii Department of Land and Natural Resources Commission on...

    Open Energy Info (EERE)

    on Water Resource Management Jump to: navigation, search Name: Hawaii Department of Land and Natural Resources Commission on Water Resource Management Address: Kalanimoku...

  13. ARM - Cloud and Land Surface Interaction Campaign (CLASIC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Questions Science and Implementation Plan (pdf) Measurement Platforms (pdf) CLASIC-Land Experiment Plan (pdf) Sponsors Science Team News Fact Sheets News & Press Mission...

  14. Arizona State Land Department Applications and Permits Website...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Arizona State Land Department Applications and Permits Website Abstract This website contains supplemental...

  15. Colorado State Board of Land Commissioners: Temporary Access...

    Open Energy Info (EERE)

    Colorado State Board of Land Commissioners: Temporary Access Permit Application Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit...

  16. Lake Encroachment Permit Application, Abutting Land Owner Addendum...

    Open Energy Info (EERE)

    Lake Encroachment Permit Application, Abutting Land Owner Addendum Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit...

  17. Texas General Land Office Construction Certificate and Dune Protection...

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - Checklist: Texas General Land Office Construction Certificate and Dune Protection Permit Requirements...

  18. Sugar Land, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Land, Texas: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 29.6196787, -95.6349463 Show Map Loading map... "minzoom":false,"mappingservice":"...

  19. Land Transport Sector in Bangladesh: An Analysis Toward Motivating...

    Open Energy Info (EERE)

    Toward Motivating GHG Emission Reduction Strategies Jump to: navigation, search Name Land Transport Sector in Bangladesh: An Analysis Toward Motivating GHG Emission Reduction...

  20. land art generator initiative | OpenEI Community

    Open Energy Info (EERE)

    land art generator initiative Home Dc's picture Submitted by Dc(266) Contributor 20 March, 2015 - 11:22 Public Art Generates Renewable Energy Beautifully biofuel art clean energy...

  1. Texas General Land Office Leasing and Easement Guidelines | Open...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Reference: Texas General Land Office Leasing and Easement Guidelines Published Publisher Not Provided, Date Not...

  2. RAPID/BulkTransmission/Land Access | Open Energy Information

    Open Energy Info (EERE)

    RAPIDBulkTransmissionLand Access < RAPID | BulkTransmission(Redirected from RAPIDBulkTransmissionLeasing) Jump to: navigation, search RAPID Regulatory and Permitting...

  3. RAPID/BulkTransmission/Land Use | Open Energy Information

    Open Energy Info (EERE)

    RAPIDBulkTransmissionLand Use < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission...

  4. RAPID/Geothermal/Land Use | Open Energy Information

    Open Energy Info (EERE)

    RAPIDGeothermalLand Use < RAPID | Geothermal Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal...

  5. Carbon Calculator for Land Use Change from Biofuels Production (CCLUB). Users' manual and technical documentation.

    SciTech Connect (OSTI)

    Mueller, S; Dunn, JB; Wang, M

    2012-06-07

    The Carbon Calculator for Land Use Change from Biofuels Production (CCLUB) calculates carbon emissions from land use change (LUC) for four different ethanol production pathways including corn grain ethanol and cellulosic ethanol from corn stover, miscanthus, and switchgrass. This document discusses the version of CCLUB released May 31, 2012 which includes corn, as did the previous CCLUB version, and three cellulosic feedstocks: corn stover, miscanthus, and switchgrass. CCLUB calculations are based upon two data sets: land change areas and above- and below-ground carbon content. Table 1 identifies where these data are stored and used within the CCLUB model, which is built in MS Excel. Land change area data is from Purdue University's Global Trade Analysis Project (GTAP) model, a computable general equilibrium (CGE) economic model. Section 2 describes the GTAP data CCLUB uses and how these data were modified to reflect shrubland transitions. Feedstock- and spatially-explicit below-ground carbon content data for the United States were generated with a surrogate model for CENTURY's soil organic carbon sub-model (Kwon and Hudson 2010) as described in Section 3. CENTURY is a soil organic matter model developed by Parton et al. (1987). The previous CCLUB version used more coarse domestic carbon emission factors. Above-ground non-soil carbon content data for forest ecosystems was sourced from the USDA/NCIAS Carbon Online Estimator (COLE) as explained in Section 4. We discuss emission factors used for calculation of international greenhouse gas (GHG) emissions in Section 5. Temporal issues associated with modeling LUC emissions are the topic of Section 6. Finally, in Section 7 we provide a step-by-step guide to using CCLUB and obtaining results.

  6. ENHANCEMENT OF TERRESTRIAL CARBON SINKS THROUGH RECLAMATION OF ABANDONED MINE LANDS IN THE APPALACHIAN REGION

    SciTech Connect (OSTI)

    Gary D. Kronrad

    2002-12-01

    The U.S.D.I. Office of Surface Mining (OSM) estimates that there are approximately 1 million acres of abandoned mine land (AML) in the Appalachian region. AML lands are classified as areas that were inadequately reclaimed or were left unreclaimed prior to the passage of the 1977 Surface Mining Control and Reclamation Act, and where no federal or state laws require any further reclamation responsibility to any company or individual. Reclamation and afforestation of these sites have the potential to provide landowners with cyclical timber revenues, generate environmental benefits to surrounding communities, and sequester carbon in the terrestrial ecosystem. Through a memorandum of understanding, the OSM and the U.S. Department of Energy (DOE) have decided to investigate reclaiming and afforesting these lands for the purpose of mitigating the negative effects of anthropogenic carbon dioxide in the atmosphere. This study determined the carbon sequestration potential of northern red oak (Quercus rubra L.), one of the major reclamation as well as commercial species, planted on West Virginia AML sites. Analyses were conducted to (1) calculate the total number of tons that can be stored, (2) determine the cost per ton to store carbon, and (3) calculate the profitability of managing these forests for timber production alone and for timber production and carbon storage together. The Forest Management Optimizer (FORMOP) was used to simulate growth data on diameter, height, and volume for northern red oak. Variables used in this study included site indices ranging from 40 to 80 (base age 50), thinning frequencies of 0, 1, and 2, thinning percentages of 20, 25, 30, 35, and 40, and a maximum rotation length of 100 years. Real alternative rates of return (ARR) ranging from 0.5% to 12.5% were chosen for the economic analyses. A total of 769,248 thinning and harvesting combinations, net present worths, and soil expectation values were calculated in this study. Results indicate that

  7. ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED WITHDRAWAL OF PUBLIC LANDS WITHIN AND SURROUNDING THE CALIENTE RAIL CORRIDOR, NEVADA

    SciTech Connect (OSTI)

    DOE

    2005-12-01

    The purpose for agency action is to preclude surface entry and the location of new mining claims, subject to valid existing rights, within and surrounding the Caliente rail corridor as described in the Yucca Mountain FEIS (DOE 2002). This protective measure is needed to enhance the safe, efficient, and uninterrupted evaluation of land areas for potential rail alignments within the Caliente rail corridor. The evaluation will assist the DOE in determining, through the Rail Alignment environmental impact statement (EIS) process, whether to construct a branch rail line, and to provide support to the BLM in deciding whether or not to reserve a ROW for the rail line under the Federal Land Policy and Management Act (FLPMA). The BLM participated as a cooperating agency in preparing this EA because it is the responsible land manager and BLM staff could contribute resource specific expertise.

  8. Investigation of subsidence damages above abandoned mine lands

    SciTech Connect (OSTI)

    Lin, Po-Ming.

    1988-01-01

    Abandoned mine lands (AML) subsidence is one of the most hazardous problems for personal property and community development. In order to improve the technique for subsidence diagnosis and the effectiveness of remedial measures, several methods and techniques have been developed in this research. A subsidence site investigation checklist is developed to guide the investigators with or without hands-on experience to collect a complete and necessary information for subsidence analysis during site investigation. A subsidence cause identification system is developed to streamline the process of analysis and for subsidence cause differentiation and identification over AML. A damage severity system is developed to evaluate the intensity of the damage to structures. A subsidence deduction model is developed based on the probability function integration method to reconstruct subsidence profile and subsurface failure zone for AML subsidence. The study is based on the case studies which include site investigation, surface subsidence survey, subsurface instrumentation, damage severity evaluation, subsidence deduction and statistical analysis. The results show that geologic conditions such as seam depth, seam height, ratios of strong and weak rocks do affect the subsidence damage area, subsidence factor, and damage severity. The relationship between above parameters can be expressed by a second order polynomial with correlation coefficients ranging from 0.7 to 0.9.

  9. Land Ice Verification and Validation Kit

    Energy Science and Technology Software Center (OSTI)

    2015-07-15

    To address a pressing need to better understand the behavior and complex interaction of ice sheets within the global Earth system, significant development of continental-scale, dynamical ice-sheet models is underway. The associated verification and validation process of these models is being coordinated through a new, robust, python-based extensible software package, the Land Ice Verification and Validation toolkit (LIVV). This release provides robust and automated verification and a performance evaluation on LCF platforms. The performance V&Vmore » involves a comprehensive comparison of model performance relative to expected behavior on a given computing platform. LIVV operates on a set of benchmark and test data, and provides comparisons for a suite of community prioritized tests, including configuration and parameter variations, bit-4-bit evaluation, and plots of tests where differences occur.« less

  10. Land Ice Verification and Validation Kit

    SciTech Connect (OSTI)

    2015-07-15

    To address a pressing need to better understand the behavior and complex interaction of ice sheets within the global Earth system, significant development of continental-scale, dynamical ice-sheet models is underway. The associated verification and validation process of these models is being coordinated through a new, robust, python-based extensible software package, the Land Ice Verification and Validation toolkit (LIVV). This release provides robust and automated verification and a performance evaluation on LCF platforms. The performance V&V involves a comprehensive comparison of model performance relative to expected behavior on a given computing platform. LIVV operates on a set of benchmark and test data, and provides comparisons for a suite of community prioritized tests, including configuration and parameter variations, bit-4-bit evaluation, and plots of tests where differences occur.

  11. Bay Area | Open Energy Information

    Open Energy Info (EERE)

    Page Edit History Bay Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Bay Area 1.1 Products and Services in the Bay Area 1.2 Research and Development...

  12. Rockies Area | Open Energy Information

    Open Energy Info (EERE)

    Rockies Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Rockies Area 1.1 Products and Services in the Rockies Area 1.2 Research and Development...

  13. Texas Area | Open Energy Information

    Open Energy Info (EERE)

    Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Texas Area 1.1 Products and Services in the Texas Area 1.2 Research and Development Institutions in the...

  14. Large area bulk superconductors

    DOE Patents [OSTI]

    Miller, Dean J.; Field, Michael B.

    2002-01-01

    A bulk superconductor having a thickness of not less than about 100 microns is carried by a polycrystalline textured substrate having misorientation angles at the surface thereof not greater than about 15.degree.; the bulk superconductor may have a thickness of not less than about 100 microns and a surface area of not less than about 50 cm.sup.2. The textured substrate may have a thickness not less than about 10 microns and misorientation angles at the surface thereof not greater than about 15.degree.. Also disclosed is a process of manufacturing the bulk superconductor and the polycrystalline biaxially textured substrate material.

  15. Carbon Sequestration on Surface Mine Lands

    SciTech Connect (OSTI)

    Donald H. Graves; Christopher Barton; Richard Sweigard; Richard Warner

    2005-12-07

    A major effort this quarter was to inventory all the planted areas to evaluate the diameter and height growth as well as determine survival rates. Soil bulk density and compaction continue to be evaluated on all the areas to determine the effects on tree growth and survival. The hydrologic quantity and quality are continuously monitored and quantified. Much effort was also expended in preparing technical presentations for professional meeting and field trips for a variety of audiences.

  16. 2012 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    Mike Lewis

    2013-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2011, through October 31, 2012. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2012 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant.

  17. 2010 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    Mike lewis

    2011-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2009, through October 31, 2010. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of special compliance conditions • Discussion of the facility’s environmental impacts. During the 2010 permit year, approximately 2.2 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

  18. 2011 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    Michael G. Lewis

    2012-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant from November 1, 2010, through October 31, 2011. The report contains the following information: (1) Site description; (2) Facility and system description; (3) Permit required monitoring data and loading rates; (4) Status of special compliance conditions and activities; and (5) Discussion of the facility's environmental impacts. During the 2011 permit year, approximately 1.22 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

  19. Assessment of Biomass Resources from Marginal Lands in APEC Economies

    SciTech Connect (OSTI)

    Milbrandt, A.; Overend, R. P.

    2009-08-01

    The goal of this study is to examine the marginal lands in Asia-Pacific Economic Cooperation (APEC) economies and evaluate their biomass productivity potential. Twelve categories of marginal lands are identified using the Global Agro-Ecological Zones system of the United Nations Food and Agriculture Organization.

  20. Hillslope stability and land use (1985). Volume II

    SciTech Connect (OSTI)

    Sidle, R.C.; Pearce, A.J.; O'Loughlin, C.L.

    1985-01-01

    This book emphasizes the natural factors affecting slope stability, including soils and geomorphic, hydrologic, vegetative, and seismic factors and provides information on landslide classification, global damage, and analytical methods. The effects of various extensive and intensive land management practices on slope stability are discussed together with methods for prediction, avoidance, and control. Examples of terrain evaluation procedures and land management practices are presented.

  1. Can land management and biomass utilization help mitigate global warming?

    SciTech Connect (OSTI)

    Schlamadinger, B.; Lauer, M.

    1996-12-31

    With rising concern about the increase of the CO{sub 2} concentration in the earth`s atmosphere there is considerable interest in various land-use based mitigation options, like afforestation of surplus agricultural land with or without subsequent harvest; improved forest management; strategies that rely on wood plantations managed in short rotation or agricultural crops with high yields to produce bioenergy, timber and other biomass products. In the first step of this study, the net carbon benefits of such strategies will be calculated per unit of land, i.e., per hectare, because it is assumed that land is the limiting resource for such strategies in the future, and thus, the benefits per unit land need to be optimized. For these calculations a computer model has been developed. The results take into account the time dependence of carbon storage in the biosphere and are shown graphically both for land and for plantation systems with constant output of biomass over time. In the second step, these results will be combined with data on available land for Austria. The potential contribution of each of the above strategies towards mitigating the Austrian CO{sub 2} emissions will be demonstrated. A comparison to other renewable mitigation options, like solar thermal or photovoltaics, will be drawn in terms of available land resources and overall CO{sub 2} reductions.

  2. Geospatial Analysis of Renewable Energy Technical Potential on Tribal Lands

    SciTech Connect (OSTI)

    Doris, E.; Lopez, A.; Beckley, D.

    2013-02-01

    This technical report uses an established geospatial methodology to estimate the technical potential for renewable energy on tribal lands for the purpose of allowing Tribes to prioritize the development of renewable energy resources either for community scale on-tribal land use or for revenue generating electricity sales.

  3. T-1 Training Area

    SciTech Connect (OSTI)

    2014-11-07

    Another valuable homeland security asset at the NNSS is the T-1 training area, which covers more than 10 acres and includes more than 20 separate training venues. Local, County, and State first responders who train here encounter a variety of realistic disaster scenarios. A crashed 737 airliner lying in pieces across the desert, a helicopter and other small aircraft, trucks, buses, and derailed train cars are all part of the mock incident scene. After formal classroom education, first responders are trained to take immediate decisive action to prevent or mitigate the use of radiological or nuclear devices by terrorists. The Counterterrorism Operations Support Center for Radiological Nuclear Training conducts the courses and exercises providing first responders from across the nation with the tools they need to protect their communities. All of these elements provide a training experience that cannot be duplicated anywhere else in the country.

  4. T-1 Training Area

    ScienceCinema (OSTI)

    None

    2015-01-09

    Another valuable homeland security asset at the NNSS is the T-1 training area, which covers more than 10 acres and includes more than 20 separate training venues. Local, County, and State first responders who train here encounter a variety of realistic disaster scenarios. A crashed 737 airliner lying in pieces across the desert, a helicopter and other small aircraft, trucks, buses, and derailed train cars are all part of the mock incident scene. After formal classroom education, first responders are trained to take immediate decisive action to prevent or mitigate the use of radiological or nuclear devices by terrorists. The Counterterrorism Operations Support Center for Radiological Nuclear Training conducts the courses and exercises providing first responders from across the nation with the tools they need to protect their communities. All of these elements provide a training experience that cannot be duplicated anywhere else in the country.

  5. Evaluating California local land use plan's environmental impact reports

    SciTech Connect (OSTI)

    Tang Zhenghong Bright, Elise; Brody, Samuel

    2009-02-15

    Local land use planning has profound impacts on environmental quality; however, few empirical studies have been conducted to systematically measure local land use plans' environmental assessment quality and to identify the factors influencing it. This paper analyzes the quality of 40 Environmental Impact Reports (EIRs) of local jurisdictions' land use plans in California. A plan evaluation protocol defined by five core components and sixty-three indicators is developed to measure the quality of local land use plans' EIRs. The descriptive results indicate that the local jurisdictions produce relatively good quality on its EIRs, but there is still much room for improvement. There are large variations in the quality of EIRs across local jurisdictions. The regression results further highlight three major factors that can significantly influence local land use plan's EIR quality: number of planners, plan updating ability, and development pressure.

  6. Savannah River Site Land Use Plan - May, 2013 i SRNS-RP-2013-00162

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River Site Land Use Plan - May, 2013 i SRNS-RP-2013-00162 Savannah River Site Land Use Plan - May, 2013 i Table of Contents 1.0 - Purpose p1 2.0 - Executive Summary p1 3.0 - SRS Land Use Overview p5 Assumptions Current Land Use Leases, Transfers and Other Land Use Actions Future Land Use Land Use Issues 4.0 - Land Use Planning and Control for Existing Missions p13 Cleanup, Production and Support Missions Natural and Cultural Resource Management 5.0 - Process for Future Land Use Changes

  7. Idaho National Laboratory Comprehensive Land Use and Environmental Stewardship Report

    SciTech Connect (OSTI)

    No name listed on publication

    2011-08-01

    Land and facility use planning and decisions at the Idaho National Laboratory (INL) Site are guided by a comprehensive site planning process in accordance with Department of Energy Policy 430.1, 'Land and Facility Use Policy,' that integrates mission, economic, ecologic, social, and cultural factors. The INL Ten-Year Site Plan, prepared in accordance with Department of Energy Order 430.1B, 'Real Property Asset Management,' outlines the vision and strategy to transform INL to deliver world-leading capabilities that will enable the Department of Energy to accomplish its mission. Land use planning is the overarching function within real property asset management that integrates the other functions of acquisition, recapitalization, maintenance, disposition, real property utilization, and long-term stewardship into a coordinated effort to ensure current and future mission needs are met. All land and facility use projects planned at the INL Site are considered through a formal planning process that supports the Ten-Year Site Plan. This Comprehensive Land Use and Environmental Stewardship Report describes that process. The land use planning process identifies the current condition of existing land and facility assets and the scope of constraints across INL and in the surrounding region. Current land use conditions are included in the Comprehensive Land Use and Environmental Stewardship Report and facility assets and scope of constraints are discussed in the Ten-Year Site Plan. This report also presents the past, present, and future uses of land at the INL Site that are considered during the planning process, as well as outlining the future of the INL Site for the 10, 30, and 100-year timeframes.

  8. EIS-0370: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Record of Decision EIS-0370: Record of Decision Windy Gap Firming Project; North Central Colorado Western Area Power Administration (Western) adopted the Windy Gap Firming Project EIS, prepared by the Bureau of Reclamation (BOR) with Western as a cooperating agency, and issued a record of decision. The EIS evaluates alternatives for construction of new reservoirs and associated facilities in the Upper Colorado River Basin. To support BOR's action, Western will relocate 3.8 miles of its

  9. Sales of Fossil Fuels Produced from Federal and Indian Lands, FY 2003 through FY 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    1 Table 10. Sales of natural gas plant liquids production from federal and Indian lands by state/area, FY 2003-14 million barrels State 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 Alabama 0 0 0 0 1 1 1 1 1 1 1 1 Alaska 0 0 0 0 0 0 0 0 - - - 0 Arizona - - - - - - 0 0 0 0 - - Arkansas - - - - - - - - - - - - California 0 0 0 0 0 0 0 0 0 0 0 0 Colorado 1 1 1 1 1 3 5 8 9 11 6 7 Florida - - - - - - - - - - - - Illinois - - - - - - - - - - - - Indiana - - - - - - - - - - - - Kansas 0 0

  10. Radionuclide concentrations in elk that winter on Los Alamos National Laboratory lands. Revision

    SciTech Connect (OSTI)

    Fresquez, P.R.; Armstrong, D.A.; Salazar, J.G.

    1994-07-01

    Elk spend the winter in areas at Los Alamos National Laboratory (LANL) that may contain radioactivity above natural and/or worldwide fallout levels. This study was initiated to determine the levels of {sup 90}Sr, {sup 137}Cs, {sup 238}Pu, {sup 239}Pu, and total uranium in various tissues (brain, hair, heart, jawbone, kidneys, leg bone, liver, and muscle) of adult cow elk that use LANL lands during the fall/winter months. No significant differences in radionuclide contents were detected in any of the tissue samples collected from elk on LANL lands as compared with elk collected from off-site locations. The total effective (radiation) dose equivalent a person would receive from consuming 3.2 lb of heart, 5.6 lb of liver, and 226 lb of muscle from elk that winter on LANL lands, after natural background has been subtracted, was 0.00008, 0.0001, and 0.008 mrem/yr, respectively. The highest dose was less than 0.01% of the International Commission on Radiological Protection permissible dose limit for protecting the public.

  11. Land cover change and remote sensing: Examples of quantifying spatiotemporal dynamics in tropical forests

    SciTech Connect (OSTI)

    Krummel, J.R.; Su, Haiping; Fox, J.; Yarnasan, S.; Ekasingh, M.

    1995-06-01

    Research on human impacts or natural processes that operate over broad geographic areas must explicitly address issues of scale and spatial heterogeneity. While the tropical forests of Southeast Asia and Mexico have been occupied and used to meet human needs for thousands of years, traditional forest management systems are currently being transformed by rapid and far-reaching demographic, political, economic, and environmental changes. The dynamics of population growth, migration into the remaining frontiers, and responses to national and international market forces result in a demand for land to produce food and fiber. These results illustrate some of the mechanisms that drive current land use changes, especially in the tropical forest frontiers. By linking the outcome of individual land use decisions and measures of landscape fragmentation and change, the aggregated results shows the hierarchy of temporal and spatial events that in summation result in global changes to the most complex and sensitive biome -- tropical forests. By quantifying the spatial and temporal patterns of tropical forest change, researchers can assist policy makers by showing how landscape systems in these tropical forests are controlled by physical, biological, social, and economic parameters.

  12. AREA RADIATION MONITOR

    DOE Patents [OSTI]

    Manning, F.W.; Groothuis, S.E.; Lykins, J.H.; Papke, D.M.

    1962-06-12

    S>An improved area radiation dose monitor is designed which is adapted to compensate continuously for background radiation below a threshold dose rate and to give warning when the dose integral of the dose rate of an above-threshold radiation excursion exceeds a selected value. This is accomplished by providing means for continuously charging an ionization chamber. The chamber provides a first current proportional to the incident radiation dose rate. Means are provided for generating a second current including means for nulling out the first current with the second current at all values of the first current corresponding to dose rates below a selected threshold dose rate value. The second current has a maximum value corresponding to that of the first current at the threshold dose rate. The excess of the first current over the second current, which occurs above the threshold, is integrated and an alarm is given at a selected integrated value of the excess corresponding to a selected radiation dose. (AEC)

  13. SSL Demonstration: Area Lighting Yuma Sector Border Patrol Area...

    Energy Savers [EERE]

    DEMONSTRATION: Area Lighting Yuma Sector Border Patrol Area, AZ A unique GATEWAY evaluation on a stretch of border between the U.S. and Mexico looks at how high-flux LED lighting ...

  14. Corrective measures technology for shallow land burial at arid sites: field studies of biointrusion barriers and erosion control

    SciTech Connect (OSTI)

    Nyhan, J.W.; Hakonson, T.E.; Lopez, E.A.

    1986-03-01

    The field research program involving corrective measures technologies for arid shallow land burial (SLB) sites is described. Results of field testing of a biointrusion barrier installed at a close-out waste disposal site (Area B) at Los Alamos are presented. Soil erosion and infiltration of water into a simulated trench cap with various surface treatments were measured, and the interaction between erosion control and subsurface water dynamics is discussed relative to waste management.

  15. Sun Grant/DOE Regional Biomass Feedstock Partnership:Herbaceous Energy Crops and CRP Land for Biomass Production

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review Sun Grant/DOE Regional Biomass Feedstock Partnership: Herbaceous Energy Crops and CRP Land for Biomass Production (Award # GO85041; WBS 7.6.2.5) 23-27 March 2015 Technology Area Review: Feedstock Supply and Logistics Vance Owens, Director North Central Sun Grant Center South Dakota State University This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement  Development of more accurate cost supply information and improved

  16. Future land use threats to range-restricted fish species in the...

    Office of Scientific and Technical Information (OSTI)

    Future land use threats to range-restricted fish species in the United States Citation ... Title: Future land use threats to range-restricted fish species in the United States Land ...

  17. EPAct 2005, Indian Lands Rights-of-Way | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    , Indian Lands Rights-of-Way EPAct 2005, Indian Lands Rights-of-Way Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study, Report to Congress PDF icon EPAct ...

  18. Western_Area_Power_Administration

    Office of Environmental Management (EM)

    Regional Partnership Overview June 2013 Briefing Overview  WRP Background  Importance of Region  WRP Tribal Relations Committee  WRP Energy Committee WRP Region's Uniqueness  5 states stretching from the Great Plains to the Pacific Ocean  Diverse terrain ranging from desert valleys to forested mountains  Significant State Trust Landholdings  Approximately 188 Federally recognized Tribes  Significant amounts of Federally managed land  According to GSA 2004 study, WRP

  19. Final Land Configuration for the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Stegen, R. L.; Kapinos, J. M.; Wehner, J. P.; Snyder, B.; Davis, R. W.

    2006-07-01

    Closure of the Rocky Flats Environmental Technology Site (RFETS) has been completed. The future land use of the site is designated as a National Wildlife Refuge. A joint effort between Kaiser-Hill, Department of Energy, U.S. Fish and Wildlife Service, Environmental Protection Agency, State of Colorado, and other stakeholders was initiated to provide direction for developing the final land configuration. Through early identification of issues and developing mutually agreeable solutions, the final land configuration of the site was successfully completed. (authors)

  20. ARM - Field Campaign - Land - Atmosphere Feedback Experiment (LAFE)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govCampaignsLand - Atmosphere Feedback Experiment (LAFE) Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : Land - Atmosphere Feedback Experiment (LAFE) 2017.08.01 - 2017.08.31 Lead Scientist : Volker Wulfmeyer Abstract The Land-Atmosphere Feedback Experiment (LAFE) will deploy several state-of-the-art scanning lidar and remote sensing systems to the ARM SGP site. These instruments will augment the ARM instrument suite in order to collect

  1. Land Management Practices More Critical as Biofuels Use Grows

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Land Management Practices More Critical as Biofuels Use Grows Land Management Practices More Critical as Biofuels Use Grows Climate Simulations Run at NERSC Show Cultivation Causes Carbon Loss in Soil August 3, 2015 Angela Hardin, (630) 252-5501, media@anl.gov LandManagement (a) Total SOC simulated by CLM-Crop over the contiguous United States. (b) Total SOC from the IGBP over the same domain as in (a). (c) Percent difference between (a) and (b). The handling of agricultural crop residues

  2. Composite analysis for solid waste storage area 6

    SciTech Connect (OSTI)

    Lee, D.W.

    1997-09-01

    The composite analysis (CA) provides an estimate of the potential cumulative impacts to a hypothetical future member of the public from the Solid Waste Storage Area 6 (SWSA 6) disposal operations and all of the other sources of radioactive material in the ground on the ORR that may interact with contamination originating in SWSA 6.The projected annual dose to hypothetical future member of the public from all contributing sources is compared to the primary dose limit of 100 mrem per year and a dose constraint of 30 mrem per year. Consistent with the CA guidance, dose estimates for the first 1000 years after disposal are emphasized for comparison with the primary dose limit and dose constraint.The current land use plan for the ORR is being revised, and may include a reduction in the land currently controlled by DOE on the ORR. The possibility of changes in the land use boundary is considered in the CA as part of the sensitivity and uncertainty analysis of the results, the interpretation of results, and the conclusions.

  3. Harmonization of Land-Use Scenarios for the Period 1500-2100: 600 Years of Global Gridded Annual Land-Use Transitions, Wood Harvest, and Resulting Secondary Lands

    SciTech Connect (OSTI)

    Hurtt, George; Chini, Louise Parsons; Frolking, Steve; Betts, Richard; Feddema, Johannes; Fischer, Gavin M.; Fisk, J.P.; Hibbard, Kathleen A.; Houghton, R. A.; Janetos, Anthony C.; Jones, C.; Kindermann, G.; Kinoshita, Tsuguki; Goldeweijk, Kees K.; Riahi, Keywan; Shevliakova, Elena; Smith, Steven J.; Stehfest, Eike; Thomson, Allison M.; Thornton, P.; Van Vuuren, Detlef; Wang, Y.

    2011-08-08

    In preparation for the fifth Assessment Report (AR5) of the Intergovernmental Panel on Climate Change (IPCC), the international community is developing new advanced Earth System Models (ESM) to assess the combined effects of human activities (e.g. land use and fossil fuel emissions) on the carbon-climate system. In addition, four Representative Concentration Pathway (RCP) scenarios of the future (2005-2100) are being provided by four Integrated Assessment Model (IAM) teams to be used as input to the ESMs for future carbon-climate projections (Moss et al., 2010). The diversity of approaches and requirements among IAMs and ESMs for tracking land-use change, along with the dependence of model projections on land-use history, presents a challenge for effectively passing data between these communities and for smoothly transitioning from the historical estimates to future projections. Here, a harmonized set of land-use scenarios are presented that smoothly connects historical reconstructions of land use with future projections, in the format required by ESMs.

  4. F Reactor Area Cleanup Complete

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – U.S. Department of Energy (DOE) contractors have cleaned up the F Reactor Area, the first reactor area at the Hanford Site in southeastern Washington state to be fully remediated.

  5. Aquatic Natural Areas Analysis and Evaluation: Oak Ridge Reservation

    SciTech Connect (OSTI)

    Baranski, Dr. Michael J.

    2011-04-01

    This report presents an assessment of the natural area value of eight Aquatic Natural Areas (ANAs) and seven Aquatic Reference Areas (ARAs) on the Oak Ridge Reservation (ORR) in Anderson and Roane Counties in east Tennessee. It follows a previous study in 2009 that analyzed and evaluated terrestrial natural areas on the Reservation. The purpose of both studies was to evaluate and rank those specially designated areas on the Reservation that contain sensitive species, special habitats, and natural area value. Natural areas receive special protections through established statutes, regulations, and policies. The ORR contains 33,542 acres (13,574 ha) administered by the Department of Energy. The surface waters of the Reservation range from 1st-order to 5th-order streams, but the majority of the streams recognized as ANAs and ARAs are 1st- and 2nd-order streams. East Fork Poplar Creek is a 4th-order stream and the largest watershed that drains Reservation lands. All the waters of the Reservation eventually reach the Clinch River on the southern and western boundaries of the ORR. All available information was collected, synthesized, and evaluated. Field observations were made to support and supplement the available information. Geographic information system mapping techniques were used to develop several quantitative attributes about the study areas. Narrative descriptions of each ANA and ARA and tables of numerical data were prepared. Criteria for assessment and evaluation were developed, and eight categories of factors were devised to produce a ranking system. The evaluation factors used in the ranking system were: (A) size of area, (B) percentage of watershed protected, (C) taxa present with protected status, (D) overall biotic diversity, (E) stream features, (F) water quality and use support ratings, (G) disturbance regime, and (H) other factors. Each factor was evaluated on a 5-point ranking scale (0-4), and each area received a composite score, where 32 was the

  6. Focus Areas | Critical Materials Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Focus Areas FA 1: Diversifying Supply FA 2: Developing Substitutes FA 3: Improving Reuse and Recycling FA 4: Crosscutting Research

  7. Montana Rule 36.2.10 General State Land Rules | Open Energy Informatio...

    Open Energy Info (EERE)

    State Land RulesLegal Abstract Montana regulation governing general rules for the administration of state lands. Published NA Year Signed or Took Effect 2014 Legal Citation...

  8. Impact of mesophyll diffusion on estimated global land CO2 fertilizati...

    Office of Scientific and Technical Information (OSTI)

    Impact of mesophyll diffusion on estimated global land CO2 fertilization Citation Details In-Document Search Title: Impact of mesophyll diffusion on estimated global land CO2 ...

  9. Solutions from the Land: Developing a New Vision for United States...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solutions from the Land: Developing a New Vision for United States Agriculture, Forestry, and Conservation Solutions from the Land: Developing a New Vision for United States ...

  10. xLPR v2.0: Framework Overview Landing platform and deterministic...

    Office of Scientific and Technical Information (OSTI)

    : Framework Overview Landing platform and deterministic model. Citation Details In-Document Search Title: xLPR v2.0: Framework Overview Landing platform and deterministic model. ...

  11. Converting Limbo Lands to Energy-Generating Stations: Renewable Energy Technologies on Underused, Formerly Contaminated Sites

    SciTech Connect (OSTI)

    Mosey, G.; Heimiller, D.; Dahle, D.; Vimmerstedt, L.; Brady-Sabeff, L.

    2007-10-01

    This report addresses the potential for using 'Limbo Lands' (underused, formerly contaminated sites, landfills, brownfields, abandoned mine lands, etc. ) as sites for renewable energy generating stations.

  12. Winning the Future: Navajo-Hopi Land Commission Leverages DOE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (PV) renewable energy project on the 22,000-acre Paragon-Bisti Solar Ranch in northwestern New Mexico. ... to develop renewable energy resources on our lands," said NHLCO ...

  13. NRS 321 - Administration, Control and Transfer of State Lands...

    Open Energy Info (EERE)

    1 - Administration, Control and Transfer of State Lands Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: NRS 321 - Administration,...

  14. Sales of Fossil Fuels Produced from Federal and Indian Lands...

    Gasoline and Diesel Fuel Update (EIA)

    lands in FY 2011 could continue to change for some time, and that revisions to such data are more likely than not to increase reported sales. However, there is no reason to...

  15. USDA - NRCS Land Evaluation and Site Assessment: Guidebook |...

    Open Energy Info (EERE)

    USDA - NRCS Land Evaluation and Site Assessment: Guidebook Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: USDA...

  16. Cooper Landing, Alaska: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Cooper Landing is a census-designated place in Kenai Peninsula Borough, Alaska. It falls...

  17. Bureau of Land Management - Techniques for Documenting a No Action...

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - Techniques for Documenting a No Action Alternative in an EA Abstract This page...

  18. Bureau of Land Management - Geothermal Drilling Permit | Open...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Form: Bureau of Land Management - Geothermal Drilling Permit Abstract This page links to the BLM application for...

  19. Bureau of Land Management - Plan of Utilization Checklist | Open...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Form: Bureau of Land Management - Plan of Utilization Checklist Abstract This page links to the BLM POU checklist....

  20. TNRC 33 - Management of Coastal Public Land | Open Energy Information

    Open Energy Info (EERE)

    33 - Management of Coastal Public Land Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: TNRC 33 - Management of Coastal...

  1. Bureau of Land Management - Sundry Notices and Reports on Wells...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Form: Bureau of Land Management - Sundry Notices and Reports on Wells Abstract This page links to the BLM Sundry...

  2. Consideration of land use change-induced surface albedo effects...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    effects in life-cycle analysis of biofuels Title Consideration of land use change-induced surface albedo effects in life-cycle analysis of biofuels Publication Type Journal Article ...

  3. Application for State Land Use Lease: Commercial/Multi-Family...

    Open Energy Info (EERE)

    CommercialMulti-Family Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Application for State Land Use Lease: CommercialMulti-Family Published...

  4. Town of Chapel Hill- Land-Use Management Ordinance

    Broader source: Energy.gov [DOE]

    In 2003, the Town of Chapel Hill adopted a land-use management ordinance that includes prohibitions against neighborhood or homeowners association covenants or other conditions of sale that...

  5. Agency of Natural Resources Policy: Use of State Lands | Open...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Agency of Natural Resources Policy: Use of State LandsPermittingRegulatory...

  6. ARM - Field Campaign - Cross-Scale Land-Atmosphere Experiment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    would love to hear from you Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : Cross-Scale Land-Atmosphere Experiment 2016.09.01 - 2019.05.31 Lead Scientist :...

  7. Utah Division of Forestry, Fire and State Lands | Open Energy...

    Open Energy Info (EERE)

    of Forestry, Fire and State Lands Address: 1594 W. North Temple, Ste 3520 Place: Salt Lake City, Utah Zip: 84114-5703 Phone Number: 801.538.5555 Website: forestry.utah.gov...

  8. BPA land conservation efforts play role in Oregon chub's delisting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the minnow has rebounded to more than 140,000, leading to the decision to delist the fish. (Courtesy of Rick Swart, ODFW) Four land acquisitions in the Willamette Valley funded...

  9. New Mexico State Land Office | Open Energy Information

    Open Energy Info (EERE)

    Default.aspx New Mexico State Land Office Associate Counsel Contacts.png Kelly Brooks Smith 505.827.5872 http:www.nmstatelands.orglegal-staff.aspx Retrieved from "http:...

  10. Bureau of Land Management - NEPA Website | Open Energy Information

    Open Energy Info (EERE)

    Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - NEPA Website Abstract This page links to the BLM NEPA website....

  11. Alaska Department of Natural Resources Land Use Plans | Open...

    Open Energy Info (EERE)

    Plans Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Alaska Department of Natural Resources Land Use Plans Published Publisher Not Provided, Date Not...

  12. Bureau of Land Management - NEPA Web Guide | Open Energy Information

    Open Energy Info (EERE)

    Web Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - NEPA Web Guide Abstract The NEPA Web Guide includes links to...

  13. Bureau of Land Management - Examples of FONSIs | Open Energy...

    Open Energy Info (EERE)

    FONSIs Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - Examples of FONSIs Abstract This web page contains examples of...

  14. Bureau of Land Management - E-Forms | Open Energy Information

    Open Energy Info (EERE)

    E-Forms Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - E-Forms Abstract This website contains electronic forms for the BLM...

  15. Sales of Fossil Fuels Produced from Federal and Indian Lands...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    of Energy Washington, DC 20585 U.S. Energy Information Administration | Sales of Fossil Fuels Produced on Federal and Indian Lands, FY 2003 through FY 2012 ii This report...

  16. Land Use and Water Efficiency in Current and Potential Future...

    Office of Scientific and Technical Information (OSTI)

    Water Efficiency in Current and Potential Future U.S. Corn and Brazilian Sugarcane Ethanol Systems (Poster) Citation Details In-Document Search Title: Land Use and Water Efficiency ...

  17. Land and Resource Management Issues Relevant to Deploying In...

    Office of Scientific and Technical Information (OSTI)

    Title: Land and Resource Management Issues Relevant to Deploying In-Situ Thermal Technologies Utah is home to oil shale resources containing roughly 1.3 trillion barrels of oil ...

  18. Local Company Purchases William & Mary Land Near Jefferson Lab...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    articles.dailypress.com2010-06-14newsdp-nws-wm-land-20100614-11jefferson-lab-mary-real-estate-foundation-new... Submitted: Tuesday, June 15, 2010 - 12...

  19. PERCENT FEDERAL LAND FOR OIL/GAS FIELD OUTLINES

    U.S. Energy Information Administration (EIA) Indexed Site

    first polygon layer (e.g. buffered well oil-field boundaries) with a field "PCTFEDLAND" ... Output: Layer (1)'s PctFedLand column gets updated Code by Kirk Kuykendall, AmberGIS; text ...

  20. RAPID/Geothermal/Land Access/Texas | Open Energy Information

    Open Energy Info (EERE)

    Texas GLO Coastal Forms Texas GLO Highway Right of Way Leasing Forms Texas GLO Oil and Gas Sealed Bid Forms Texas GLO Rights of Way Forms Texas General Land Office - Rights of...

  1. Federal Land Policy and Management Act of 1976 | Open Energy...

    Open Energy Info (EERE)

    from the Secretary of the Interior to the Director of the BLM, including oversight of oil and gas leases. References Federal Land Policy and Management Act of 19761 The...

  2. Energy Consumption and Renewable Energy Development Potential on Indian Lands

    Reports and Publications (EIA)

    2000-01-01

    Includes information on the electricity use and needs of Indian households and tribes, the comparative electricity rates that Indian households are paying, and the potential for renewable resources development of Indian lands.

  3. Microsoft Word - XX 13 Coyote Creek land acquisition provides...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wingert, 503-230-4140 or 503-230-5131 Rare wet prairie, wildlife corridor protected by land acquisition in Willamette Valley Portland, Ore. - Building upon a well-established...

  4. Colorado State Land Board: Right-of-Way General Information ...

    Open Energy Info (EERE)

    Colorado State Land Board: Right-of-Way General Information Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook:...

  5. Prairie Land Electric Coop Inc | Open Energy Information

    Open Energy Info (EERE)

    Electric Coop Inc Jump to: navigation, search Name: Prairie Land Electric Coop Inc Place: Kansas Phone Number: 785-877-3323 or 1-800-577-3323 Website: www.prairielandelectric.com...

  6. The Bureau of Land Management's Well Information System (WIS...

    Open Energy Info (EERE)

    Bureau of Land Management's Well Information System (WIS) How-To Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Guide...

  7. Rules and Regulations of the Board of Land Commissioners, Chapter...

    Open Energy Info (EERE)

    Board of Land Commissioners, Chapter 3 - Easements Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Rules and Regulations of...

  8. Groundwater monitoring plan for the proposed state-approved land disposal structure

    SciTech Connect (OSTI)

    Reidel, S.P.

    1993-10-13

    This document outlines a detection-level groundwater monitoring program for the state-approved land disposal structure (SALDS). The SALDS is an infiltration basin proposed for disposal of treated effluent from the 200 Areas of the Hanford Site. The purpose of this plan is to present a groundwater monitoring program that is capable of determining the impact of effluent disposal at the SALDS on the quality of groundwater in the uppermost aquifer. This groundwater monitoring plan presents an overview of the SALDS, the geology and hydrology of the area, the background and indicator evaluation (detection) groundwater monitoring program, and an outline of a groundwater quality assessment (compliance) program. This plan does not provide a plan for institutional controls to track tritium beyond the SALDS.

  9. Impact of land use change on the local climate over the Tibetan Plateau

    SciTech Connect (OSTI)

    Jin, J.; Lu, S.; Li, S.; Miller, N.L.

    2010-04-01

    Observational data show that the remotely sensed leaf area index (LAI) has a significant downward trend over the east Tibetan Plateau (TP), while a warming trend is found in the same area. Further analysis indicates that this warming trend mainly results from the nighttime warming. The Single-Column Atmosphere Model (SCAM) version 3.1 developed by the National Center for Atmospheric Research is used to investigate the role of land use change in the TP local climate system and isolate the contribution of land use change to the warming. Two sets of SCAM simulations were performed at the Xinghai station that is located near the center of the TP Sanjiang (three rivers) Nature Reserve where the downward LAI trend is largest. These simulations were forced with the high and low LAIs. The modeling results indicate that, when the LAI changes from high to low, the daytime temperature has a slight decrease, while the nighttime temperature increases significantly, which is consistent with the observations. The modeling results further show that the lower surface roughness length plays a significant role in affecting the nighttime temperature increase.

  10. Penobscot Indian Nation's Strategic Energy Planning Efficiency on tribal Lands

    SciTech Connect (OSTI)

    Sockalexis, Mike; Fields, Brenda

    2006-11-30

    The energy grant provided the resources to evaluate the wind, hydro, biomass, geothermal and solar resource potential on all Penobscot Indian Naiton's Tribal lands. The two objectives address potential renewable energy resources available on tribal lands and energy efficiency measures to be taken after comprehensive energy audits of commercial facilities. Also, a Long Term Strategic Energy Plan was developed along with a plan to reduce high energy costs.

  11. Geospatial Analysis of Renewable Energy Technical Potential on Tribal Lands

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Geospatial Analysis of Renewable Energy Technical Potential on Tribal Lands E. Doris, A. Lopez, and D. Beckley National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence Ave. SW, Washington DC 20585 | 202-586-1272 energy.gov/indianenergy | indianenergy@hq.doe.gov Geospatial Analysis of Renewable Energy Technical Potential on Tribal Lands NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

  12. RE-Powering America's Land Initiative Tracking Matrix | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Initiative Tracking Matrix RE-Powering America's Land Initiative Tracking Matrix Using publically available information, the Environmental Protection Agency's RE-Powering America's Land Initiative project tracking matrix maintains a list of completed renewable energy installations on contaminated sites and landfills. This document provides summary statistics of known installations and discusses emerging trends. Partner Agency: U.S. Environmental Protection Agency Resource Type:

  13. RE-Powering America's Land Mapper | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mapper RE-Powering America's Land Mapper The Environmental Protection Agency's (EPA's) RE-Powering Mapper, a series of Google Earth files, makes it possible to view EPA's information about renewable energy potential on contaminated lands, landfills, and mine sites, alongside other information contained in Google Earth. This tool screens more than 66,000 EPA- and state-tracked sites, comprising over 35 million acres. Using screening criteria developed in collaboration with the U.S. Department of

  14. Protecting Lab land and the creatures that inhabit it

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protecting Lab land and the creatures that inhabit it Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: September 1, 2016 all issues All Issues » submit Protecting Lab land and the creatures that inhabit it Working to protect endangered species and minimizing fire danger. April 1, 2013 View of Sangre de Christo mauntains from overlook on NM502 Mexican Spotted Owls live on Lab property. Contact Editor Linda Anderman Email Community

  15. Transfer and Transition: Interagency Coordination for Managing Public Lands

    Office of Scientific and Technical Information (OSTI)

    at UMTRCA Title II Sites in Wyoming - 16614 (Conference) | SciTech Connect Conference: Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming - 16614 Citation Details In-Document Search Title: Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming - 16614 By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17

  16. Holistic Interactions of Shallow Clouds, Aerosols, and Land-Ecosystems

    Office of Scientific and Technical Information (OSTI)

    (HI-SCALE) Science Plan (Program Document) | SciTech Connect Holistic Interactions of Shallow Clouds, Aerosols, and Land-Ecosystems (HI-SCALE) Science Plan Citation Details In-Document Search Title: Holistic Interactions of Shallow Clouds, Aerosols, and Land-Ecosystems (HI-SCALE) Science Plan Cumulus convection is an important component in the atmospheric radiation budget and hydrologic cycle over the Southern Great Plains and over many regions of the world, particularly during the

  17. Biofuels, land and water : a systems approach to sustainability.

    SciTech Connect (OSTI)

    Gopalakrishnan, G.; Negri, M. C.; Wang, M.; Wu, M.; Snyder, S. W.; LaFreniere, L.

    2009-08-01

    There is a strong societal need to evaluate and understand the sustainability of biofuels, especially because of the significant increases in production mandated by many countries, including the United States. Sustainability will be a strong factor in the regulatory environment and investments in biofuels. Biomass feedstock production is an important contributor to environmental, social, and economic impacts from biofuels. This study presents a systems approach where the agricultural, energy, and environmental sectors are considered as components of a single system, and environmental liabilities are used as recoverable resources for biomass feedstock production. We focus on efficient use of land and water resources. We conducted a spatial analysis evaluating marginal land and degraded water resources to improve feedstock productivity with concomitant environmental restoration for the state of Nebraska. Results indicate that utilizing marginal land resources such as riparian and roadway buffer strips, brownfield sites, and marginal agricultural land could produce enough feedstocks to meet a maximum of 22% of the energy requirements of the state compared to the current supply of 2%. Degraded water resources such as nitrate-contaminated groundwater and wastewater were evaluated as sources of nutrients and water to improve feedstock productivity. Spatial overlap between degraded water and marginal land resources was found to be as high as 96% and could maintain sustainable feedstock production on marginal lands. Other benefits of implementing this strategy include feedstock intensification to decrease biomass transportation costs, restoration of contaminated water resources, and mitigation of greenhouse gas emissions.

  18. A checklist of plant and animal species at Los Alamos National Laboratory and surrounding areas

    SciTech Connect (OSTI)

    Hinojosa, H.

    1998-02-01

    Past and current members of the Biology Team (BT) of the Ecology Group have completed biological assessments (BAs) for all of the land that comprises Los Alamos National Laboratory (LANL). Within these assessments are lists of plant and animal species with the potential to exist on LANL lands and the surrounding areas. To compile these lists, BT members examined earlier published and unpublished reports, surveys, and data bases that pertained to the biota of this area or to areas that are similar. The species lists that are contained herein are compilations of the lists from these BAs, other lists that were a part of the initial research for the performance of these BAs, and more recent surveys.

  19. SSL Demonstration: Area Lighting, Yuma Sector Border Patrol Area, AZ

    SciTech Connect (OSTI)

    2015-05-28

    Along the Yuma Sector Border Patrol Area in Yuma, Arizona, the GATEWAY program conducted a trial demonstration in which the incumbent quartz metal halide area lighting was replaced with LED at three pole locations at the Yuma Sector Border Patrol Area in Yuma, Arizona. The retrofit was documented to better understand LED technology performance in high-temperature environments. This document is a summary brief of the Phase 1.0 and 1.1 reports previously published on this demonstration.

  20. Desert Peak Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Desert Peak Geothermal Area (Redirected from Desert Peak Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Desert Peak Geothermal Area Contents 1 Area Overview 2...