National Library of Energy BETA

Sample records for wildlife project manager

  1. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    SciTech Connect (OSTI)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  2. Hellsgate Big Game Winter Range Wildlife Mitigation Site Specific Management Plan for the Hellsgate Project.

    SciTech Connect (OSTI)

    Berger, Matthew T.; Judd, Steven L.

    1999-01-01

    This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.

  3. Phase I Water Rental Pilot Project : Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    SciTech Connect (OSTI)

    Riggin, Stacey H.; Hansen, H. Jerome

    1992-10-01

    The Idaho Water Rental Pilot Project was implemented as a part of the Non-Treaty Storage Fish and Wildlife Agreement (NTSA) between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to improve juvenile and adult salmon and steelhead passage in the lower Snake River with the use of rented water for flow augmentation. The primary purpose of this project is to summarize existing resource information and provide recommendations to protect or enhance resident fish and wildlife resources in Idaho with actions achieving flow augmentation for anadromous fish. Potential impacts of an annual flow augmentation program on Idaho reservoirs and streams are modeled. Potential sources of water for flow augmentation and operational or institutional constraints to the use of that water are identified. This report does not advocate flow augmentation as the preferred long-term recovery action for salmon. The state of Idaho strongly believes that annual drawdown of the four lower Snake reservoirs is critical to the long-term enhancement and recovery of salmon (Andrus 1990). Existing water level management includes balancing the needs of hydropower production, irrigated agriculture, municipalities and industries with fish, wildlife and recreation. Reservoir minimum pool maintenance, water quality and instream flows are issues of public concern that will be directly affected by the timing and quantity of water rental releases for salmon flow augmentation, The potential of renting water from Idaho rental pools for salmon flow augmentation is complicated by institutional impediments, competition from other water users, and dry year shortages. Water rental will contribute to a reduction in carryover storage in a series of dry years when salmon flow augmentation is most critical. Such a reduction in carryover can have negative impacts on reservoir fisheries by eliminating shoreline spawning beds, reducing available fish habitat, and exacerbating adverse water quality conditions. A reduction in carry over can lead to seasonal reductions in instream flows, which may also negatively affect fish, wildlife, and recreation in Idaho. The Idaho Water Rental Pilot Project does provide opportunities to protect and enhance resident fish and wildlife habitat by improving water quality and instream flows. Control of point sources, such as sewage and industrial discharges, alone will not achieve water quality goals in Idaho reservoirs and streams. Slow, continuous releases of rented water can increase and stabilize instream flows, increase available fish and wildlife habitat, decrease fish displacement, and improve water quality. Island integrity, requisite for waterfowl protection from mainland predators, can be maintained with improved timing of water releases. Rebuilding Snake River salmon and steelhead runs requires a cooperative commitment and increased flexibility in system operations to increase flow velocities for fish passage and migration. Idaho's resident fish and wildlife resources require judicious management and a willingness by all parties to liberate water supplies equitably.

  4. Fish & Wildlife Annual Project Summary, 1983.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1984-07-01

    BPA's Division of Fish and Wildlife was created in 1982 to develop, coordinate and manage BPA's fish and wildlife program. Division activities protect, mitigate, and enhance fish and wildlife resources impacted by hydroelectric development and operation in the Columbia River Basin. At present the Division spends 95% of its budget on restoration projects. In 1983, 83 projects addressed all aspects of the anadromous fish life cycle, non-migratory fish problems and the status of wildlife living near reservoirs.

  5. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  6. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  7. Project Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Management Project Management MaRIE is the experimental facility needed to control the time-dependent properties of materials for national security science missions. It...

  8. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    SciTech Connect (OSTI)

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project proposals are subjected to a rigorous review process prior to receiving final approval. An eleven-member panel of scientists referred to as the Independent Scientific Review Panel (ISRP) examines project proposals. The ISRP recommends project approval based on scientific merit. The Bonneville Power Administration (BPA), the Columbia Basin Fish and Wildlife Authority (CBFWA), Council staff, the U.S. Fish and Wildlife Service (USFWS), the National Oceanic and Atmospheric Administration (NOAA), and subbasin groups also review project proposals to ensure each project meets regional and subbasin goals and objectives. The Program also includes a public involvement component that gives the public an opportunity to provide meaningful input on management proposals. After a thorough review, the Burns Paiute Tribe (BPT) acquired the Malheur River Mitigation Project (Project) with BPA funds to compensate, in part, for the loss of fish and wildlife resources in the Columbia and Snake River Basins and to address a portion of the mitigation goals identified in the Council's Program (NPPC 2000).

  9. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  10. Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  11. project management

    National Nuclear Security Administration (NNSA)

    3%2A en Project Management and Systems Support http:www.nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  12. project management

    National Nuclear Security Administration (NNSA)

    %2A en Project Management and Systems Support http:nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  13. Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

    SciTech Connect (OSTI)

    Soults, Scott

    2009-08-05

    The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

  14. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect (OSTI)

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  15. PROJECT MANAGEMENT PLANS Project Management Plans

    Office of Environmental Management (EM)

    MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in

  16. Wildlife Management Plan for the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Giffen, Neil R; Evans, James W.; Parr, Patricia Dreyer

    2007-10-01

    This document outlines a plan for management of the wildlife resources on the Department of Energy's (DOE's) Oak Ridge Reservation. Management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; restoration of wildlife species; preservation, management, and enhancement of wildlife habitats; coordination of wildlife studies and characterization of areas; and law enforcement. Wildlife resources are divided into several categories, each with a specific set of objectives and procedures for attaining them. These objectives are management of (1) wildlife habitats to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species to produce selected species in desired numbers on designated land units; (3) game species for research, education, recreation, and public safety; (4) the Three Bend Scenic and Wildlife Management Refuge Area; (5) nuisance wildlife, including nonnative species, to achieve adequate population control for the maintenance of health and safety on the Reservation; (6) sensitive species (i.e., state or federally listed as endangered, threatened, of special concern, or in need of management) through preservation and protection of both the species and habitats critical to the survival of those species; and (7) wildlife disease. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency (TWRA) and the Oak Ridge National Laboratory through agreements between TWRA and DOE and between DOE and UT-Battelle, LLC.

  17. EA-0928: Burlington Bottoms Wildlife Mitigation Project, Multnomah County, Oregon

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration proposal to fund wildlife management and enhancement activities for the Burlington...

  18. Wildlife and Wildlife Habitat Mitigation Plan for Libby Hydroelectric Project, Final Report.

    SciTech Connect (OSTI)

    Mundinger, John

    1985-01-01

    This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Libby hydroelectric project. Mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. The report describes mitigation that has already taken place and 8 recommended mitigation projects designed to complete total wildlife mitigation. 8 refs., 2 figs., 12 tabs.

  19. Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife.

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

  20. Blue Creek Winter Range : Wildlife Mitigation Project : Preliminary Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    This preliminary Environmental Assessment examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities are analyzed: Habitat protection; Habitat enhancement; Operation and maintenance; and Monitoring and evaluation. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  1. Nevada Department of Wildlife Application for Energy Projects...

    Open Energy Info (EERE)

    Nevada Department of Wildlife Application for Energy Projects "Fund for the Recovery of Costs" Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  2. Hellsgate Big Game Winter Range Wildlife Mitigation Project : Annual Report 2008.

    SciTech Connect (OSTI)

    Whitney, Richard P.; Berger, Matthew T.; Rushing, Samuel; Peone, Cory

    2009-01-01

    The Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) was proposed by the Confederated Tribes of the Colville Reservation (CTCR) as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. At present, the Hellsgate Project protects and manages 57,418 acres (approximately 90 miles2) for the biological requirements of managed wildlife species; most are located on or near the Columbia River (Lake Rufus Woods and Lake Roosevelt) and surrounded by Tribal land. To date we have acquired about 34,597 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. In addition to the remaining 1,237 HUs left unmitigated, 600 HUs from the Washington Department of Fish and Wildlife that were traded to the Colville Tribes and 10 secure nesting islands are also yet to be mitigated. This annual report for 2008 describes the management activities of the Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) during the past year.

  3. Colville Confederated Tribes' Performance Project Wildlife Mitigation Acquisitions, Annual Report 2006.

    SciTech Connect (OSTI)

    Whitney, Richard; Berger, Matthew; Tonasket, Patrick

    2006-12-01

    The Colville Confederated Tribes Wildlife Mitigation Project is protecting lands as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. The Mitigation Project protects and manages 54,606 acres for the biological requirements of managed wildlife species that are important to the Colville Tribes. With the inclusion of 2006 acquisitions, the Colville Tribes have acquired approximately 32,018 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. This annual report for 2006 briefly describes that four priority land acquisitions that were considered for enrollment into the Colville Tribes Mitigation Project during the 2006 contract period.

  4. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    SciTech Connect (OSTI)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.

  5. Project Management Lessons Learned

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-05

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

  6. FSM 2600 Wildlife, Fish, and Sensitive Plan Habitat Management...

    Open Energy Info (EERE)

    FSM 2600 Wildlife, Fish, and Sensitive Plan Habitat Management Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: FSM 2600...

  7. Malheur River Wildlife Mitigation Project : 2008 Annual Report.

    SciTech Connect (OSTI)

    Kesling, Jason; Abel, Chad; Schwabe, Laurence

    2009-01-01

    In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

  8. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

  9. Improving Project Management

    Office of Environmental Management (EM)

    Improving Project Management Report of the Contract and Project Management Working Group November 2014 1 TABLE OF CONTENTS 1. Foreword ........................................................................................................................................................................... 2 2. Executive Summary ...................................................................................................................................................... 3 2.1 Summary of

  10. BETO Active Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BETO Active Project Management Bioenergy Technologies Office - Program Management Review 6/25/15 Liz Moore Technology Manager eere.energy.gov Program Managers * Manages portfolio within their technology area * Establishes technical and cost goals * Strategic planning for technology area * Budget preparation/justification for technology portfolio * Identifies needs for workshops and FOAs * Oversees portfolio reviews including high-level project status Technology Managers * Plans/conducts

  11. Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Project Management Some of the Project Management Division’s many functions involve developing risk management plans, managing project risks, and providing input on prime contractor performance. Some of the Project Management Division's many functions involve developing risk management plans, managing project risks, and providing input on prime contractor performance. Employees in our Project Management Division address projects' planning and execution, as specified in

  12. Contract/Project Management

    Office of Environmental Management (EM)

    2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects

  13. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: ...

  14. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: ...

  15. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA...

  16. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: ...

  17. Acquisition and Project Management

    National Nuclear Security Administration (NNSA)

    4%2A en Acquisition and Project Management Office volunteers get up-close look at Office of Secure Transportation exercise http:nnsa.energy.govblogacquisition-and-project-mana...

  18. Rainwater Wildlife Area Habitat Evaluation Procedures Report; A Columbia Basin Wildlife Mitigation Project.

    SciTech Connect (OSTI)

    Childs, Allen B.

    2004-01-01

    The 8,768 acre Rainwater Wildlife Area was acquired in September 1998 by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) through an agreement with Bonneville Power Administration (BPA) to partially offset habitat losses associated with construction of the John Day and McNary hydroelectric facilities on the mainstem Columbia River. U.S. Fish and Wildlife Service (USFWS) Habitat Evaluation Procedures (HEP) were used to determine the number of habitat units credited to BPA for acquired lands. Upland and riparian forest, upland and riparian shrub, and grassland cover types are evaluated in this study. Targeted wildlife species include downy woodpecker (Picoides pubescens), black-capped chickadee (Parus atricopillus), blue grouse (Dendragapus obscurus), great blue heron (Ardea herodias), yellow warbler (Dendroica petechia), mink (Mustela vison), and Western meadowlark (Sturnella neglecta). Habitat surveys were conducted in 1998 and 1999 in accordance with published HEP protocols and included 65,300, 594m{sup 2}2 plots, and 112 one-tenth-acre plots. Between 153.3 and 7,187.46 acres were evaluated for each target wildlife mitigation species. Derived habitat suitability indices were multiplied by corresponding cover-type acreages to determine the number of habitat units for each species. The total baseline habitat units credited to BPA for the Rainwater Wildlife Area and its seven target species is 5,185.3 habitat units. Factors limiting habitat suitability are related to the direct, indirect, and cumulative effects of past livestock grazing, road construction, and timber harvest which have simplified the structure, composition, and diversity of native plant communities. Alternatives for protecting and improving habitat suitability include exclusion of livestock grazing, road de-commissioning/obliteration, reforestation and thinning, control of competing and unwanted vegetation (including noxious weeds), reestablishing displaced or reduced native vegetation species, allowance of normative processes such as fire occurrence, and facilitating development of natural stable stream channels and associated floodplains. Implementation of habitat enhancement and restoration activities could generate an additional 1,850 habitat units in 10 years. Baseline and estimated future habitat units total 7,035.3 for the Rainwater Wildlife Area. Habitat protection, enhancement and restoration will require long-term commitments from managers to increase probabilities of success and meet the goals and objectives of the Northwest Power Planning Council's Fish and Wildlife Mitigation Program.

  19. Contract/Project Management

    Office of Environmental Management (EM)

    8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete

  20. Contract/Project Management

    Office of Environmental Management (EM)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  1. Contract/Project Management

    Office of Environmental Management (EM)

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  2. Contract/Project Management

    Office of Environmental Management (EM)

    4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125%

  3. Contract/Project Management

    Office of Environmental Management (EM)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target 1st Qtr FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to

  4. Contract/Project Management

    Office of Environmental Management (EM)

    Second Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10).

  5. Contract/Project Management

    Office of Environmental Management (EM)

    Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 71% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10).

  6. Contract/Project Management

    Office of Environmental Management (EM)

    3 First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Final FY 2013 Pre- & Post-CAP Final Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 83% Construction 86% Cleanup 80% 70% Pre-CAP 84% Post-CAP This is based on a 3- year rolling average (FY11 to FY13). TPC is Total Project Cost.

  7. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 69% Line Item 67% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total

  8. Contract/Project Management

    Office of Environmental Management (EM)

    First Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 79% Line Item 71% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total

  9. Contract/Project Management

    Office of Environmental Management (EM)

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC

  10. Contract/Project Management

    Office of Environmental Management (EM)

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is

  11. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 77% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is

  12. Contract/Project Management

    Office of Environmental Management (EM)

    First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 84% Construction 83% Cleanup 85% 77% Pre-CAP 86% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  13. Contract/Project Management

    Office of Environmental Management (EM)

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 88% Construction 87% Cleanup 89% 77% Pre-CAP 92% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  14. Contract/Project Management

    Office of Environmental Management (EM)

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 87% Construction 87% Cleanup 87% 77% Pre-CAP 90% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  15. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Final FY 2012 Pre- & Post-CAP Final Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 86% Construction 87% Cleanup 84% 77% Pre-CAP 89% Post-CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  16. Project Management Plan Examples

    Broader source: Energy.gov [DOE]

    The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The elements table below should be used to navigate to the subject...

  17. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Actual FY 2013 Pre- & Post-CAP* Actual Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90% 83% Construction 84% Cleanup 82% 70% Pre-CAP 84% Post-CAP Based on 3-year rolling period (FY11 to FY13) of 93 projects. TPC is Total Project Cost.

  18. Project Management Policies & Principles Memo

    Broader source: Energy.gov [DOE]

    Memo enhances and clarifies departmental policy related to project management as a result of the Improving Project Management Study and subsequent Secretarial Memo dated December 2014.

  19. Acquisition and Project Management Continuous Improvement Presentation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Presentation Presentation on Acquisition and Project Management...

  20. Contract/Project Management

    Office of Environmental Management (EM)

    Second Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Forecast FY 2013 Pre- & Post-CAP* Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 83% Construction 85% Cleanup 80% 70% Pre-CAP 84% Post-CAP This is based on a 3- year rolling average (FY11 to FY13). TPC is Total Project Cost.

  1. Contract/Project Management

    Office of Environmental Management (EM)

    3 Third Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Forecast FY 2013 Pre- & Post-CAP* Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 83% Construction 85% Cleanup 80% 70% Pre-CAP 84% Post-CAP This is based on a 3- year rolling average (FY11 to FY13). TPC is Total Project Cost.

  2. wildlife

    National Nuclear Security Administration (NNSA)

    between Pantex, West Texas A&M University, and the U.S. Geological Survey's Fish and Wildlife Research Unit at Texas Tech University.

  3. Columbia Basin Fish and Wildlife Authority Project Abstracts; May 25-27, Portland, Oregon, 1997 Annual Review.

    SciTech Connect (OSTI)

    Allee, Brian J.

    1997-06-26

    Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.

  4. LTS Project Management - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Management About Us LTS Home Page LTS Project Management LTS Transition and Timeline LTS Execution LTS Background LTS Information Management LTS Fact Sheets / Briefings LTS In The News LTS Related Links LTS Contact Us LTS Project Management Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size DOE-RL Office of Assistant Manager for Mission Support (AMMS) is responsible for LTS Program Management. The Site Stewardship Division is responsible for LTS under AMMS

  5. BETO Project Management Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Review June 25, 2015 Jonathan Male Director, Bioenergy Technologies Office (BETO) 2 | Bioenergy Technologies Office I. BETO Portfolio II. Coordination of Technology Areas III. Synergies IV. Project Impacts V. Technology Pathways VI. Budget Priorities VII. Other Technologies & Market Trends VIII. New Initiatives Outline 3 | Bioenergy Technologies Office BETO Portfolio * Integration of lessons learned for IBRs - BETO's IBR Investment Report has been finalized and will be

  6. Project Management Career Development Program | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    are here Home Operational Management Certifications and Professional Development Project Management Career Development Program Project Management Career Development...

  7. Energy Department Announces New Projects to Help Protect Wildlife...

    Broader source: Energy.gov (indexed) [DOE]

    A current challenge facing wind energy developers in the United States is how to protect wildlife while responsibly deploying and operating this reliable source of clean energy. As ...

  8. Environmental Management (EM) Cleanup Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

  9. Energy Department Announces New Projects to Help Protect Wildlife at Wind

    Office of Environmental Management (EM)

    Energy Plants | Department of Energy Projects to Help Protect Wildlife at Wind Energy Plants Energy Department Announces New Projects to Help Protect Wildlife at Wind Energy Plants April 14, 2015 - 1:08pm Addthis The Energy Department today announced more than $1.75 million for five projects that will develop and demonstrate technologies to reduce the potential impacts of wind farms on sensitive bat species. A current challenge facing wind energy developers in the United States is how to

  10. Project Management Improvements Drive Progress

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Improving project management has been a top priority of EM’s senior leadership.

  11. Project Management Plans | Department of Energy

    Energy Savers [EERE]

    Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. PDF icon Project Management Plans More Documents & Publications Project Management Plan Examples Project Management Plan Examples 1 - 80 Deactivation Management

  12. Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-17)

    SciTech Connect (OSTI)

    N /A

    2001-09-13

    BPA proposes to partially fund the acquisition of 7,630 acres of shrub-steppe, riparian, and wetland habitat in northern Franklin County, Washington. Title to the land will be transferred initially to The Conservation Fund and ultimately for inclusion as part of the National Wildlife Refuge System. Passive management practices will take place on the land until an official management plan is developed and approved for the property. Some short-term control of invasive, exotic plant species may occur as necessary prior to the approval of a management plan. The compliance checklist for this project was completed by Randy Hill with the U.S. Fish and Wildlife Service, Columbia National Wildlife Refuge and meets the standards and guidelines for the Wildlife Mitigation Program Environmental Impact Statement (EIS) and Record of Decision (ROD). A comprehensive management plan will be prepared for the property after it is acquired and will follow the guidelines and mitigation measures detailed in the Wildlife Mitigation Program EIS and ROD. No plant or animal species listed under the Endangered Species Act (ESA) will be affected by the fee-title purchase of the subject property. Mark Miller with the Eastern Washington Ecological Services Office of USFWS concurred with this finding on August 3, 2001. Section 7 consultation will be conducted by BPA and USFWS, as necessary, prior to the implementation of any restoration or enhancement activities on the site. In accordance with the National Historic Preservation Act of 1966 (NHPA) and USFWS policy, the addition of the Eagle Lakes property to the National Wildlife Refuge System does not constitute an undertaking as defined by the NHPA, or require compliance with Section 106 of the NHPA. Anan Raymond, Regional Archaeologist with USFWS Region 1 Cultural Resource Team, concurred with this finding on May 4, 2001. Compliance with NHPA, including cultural resources surveys, will be implemented, as necessary, once specific management activities are proposed for the property. In the unlikely event that archaeological material is encountered during developments that might occur prior to a cultural resource survey, an archeologist will immediately be notified and work halted in the vicinity of the finds until they can be inspected and assessed. A Level I Contaminants Survey was completed on April 3, 2000 by Toni Davidson, Environmental Contaminants Specialist with the USFWS Upper Columbia River Basin Field Office. The survey found that overall the lakes, wetlands, and terrestrial habitats on the site appear to be in a healthy condition. The only concern expressed in the survey report was over the presence of two household/farm dumps. As a requirement of the Eagle Lakes sale, the landowner agreed to remove the dumps to the satisfaction of the USFWS contaminant specialist before the title to the land is transferred. A follow-up survey will be conducted to confirm compliance with this requirement of sale. Public involvement associated with this project has included written notification and solicitation of comments to interested parties, adjacent landowners, local tribes, government agencies, non-governmental organizations, and sports clubs. Public response from the mail-out indicated general support for the project, although some questions were raised about the provision of seasonal hunting and fishing on the property. These types of questions will be addressed in the development of a management plan for the Eagle Lakes land. Because of initial favorable comments on this project, it was decided that subsequent public meetings and/or workshops were not warranted.

  13. Acquisition and Project Management | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    Acquisition and Project Management Acquisition and Project Management Acquisition and Project Management Office volunteers get up-close look at Office of Secure Transportation...

  14. 516 DM Chapter 8 Managing the NEPA Process U.S. Fish and Wildlife...

    Open Energy Info (EERE)

    8 Managing the NEPA Process U.S. Fish and Wildlife Service Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: 516 DM Chapter 8 Managing...

  15. Sharp-tailed Grouse and Pygmy Rabbit Wildlife Mitigation Project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    The Proposed Action is needed to protect and enhance shrub-steppe and riparian habitat for sharp-tailed grouse (Tympanuchus phasianellus columbianus), Pygmy rabbits (Brachylagus idahoensis), and other indigenous wildlife species. The purpose of the Proposed Action is to compensate, in part, for wildlife habitat lost from the construction of Grand Coulee Dam and the inundation of Lake Roosevelt. Bonneville Power Administration proposes to fund management agreements, conservation easements, acquisition of fee title, or a combination of these on as many as 29,000 acres in Lincoln and Douglas Counties to improve shrub-steppe and riparian habitat for sharp-tailed grouse and pygmy rabbits. The BPA also proposes to fund habitat improvements (enhancements) on project lands including existing public lands. Proposed habitat treatments would include control of grazing; planting of native trees, shrubs, forbs and grasses; protection of wetlands and streambanks; herbicide use; fire prescriptions; and wildfire suppression. Proposed management activities may include predator control, population introductions, and control of crop depredation.

  16. Sharp-Tailed Grouse and Pygmy Rabbit Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect (OSTI)

    Untied States. Bonneville Power Adminsitration.

    1992-10-01

    The Proposed Action is needed to protect and enhance shrub-steppe and riparian habitat for sharp-tailed grouse (Tympanuchus phasianellus columbianus), Pygmy rabbits (Brachylagus idahoensis), and other indigenous wildlife species. The purpose of the Proposed Action is to compensate, in part, for wildlife habitat lost from the construction of Grand Coulee Dam and the inundation of Lake Roosevelt. Bonneville Power Administration proposes to fund management agreements, conservation easements, acquisition of fee title, or a combination of these on as many as 29,000 acres in Lincoln and Douglas Counties to improve shrub-steppe and riparian habitat for sharp-tailed grouse and pygmy rabbits. The BPA also proposes to fund habitat improvements (enhancements) on project lands including existing public lands. Proposed habitat treatments would include control of grazing; planting of native trees, shrubs, forbs and grasses; protection of wetlands and streambanks; herbicide use; fire prescriptions; and wildfire suppression. Proposed management activities may include predator control, population introductions, and control of crop depredation.

  17. Project Management Perspective - Paul Bosco, Director, Office...

    Office of Environmental Management (EM)

    Project Management Perspective - Paul Bosco, Director, Office of Acquisition and Project Management Agenda Project Portfolio and Trends Project Success Metrics Other Performance ...

  18. Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  19. EA-1023: Willow Creek Wildlife Mitigation Project, Eugene, Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration's proposal to fund habitat acquisition (of land or a conservation easement), wildlife...

  20. EA-0939: Blue Creek Winter Range: Wildlife Mitigation Project, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy's Bonneville Power Administration to secure land and conduct wildlife habitat enhancement and long term...

  1. EA-1096: Washington Wildlife Mitigation Projects (Programmatic), Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy Bonneville Power Administration to fund the portion of the Washington Wildlife Mitigation Agreement...

  2. Project Manager's Guide to Managing Impact and Process Evaluation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Manager's Guide to Managing Impact and Process Evaluation Studies Project Manager's Guide to Managing Impact and Process Evaluation Studies This report provides a...

  3. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Capital Asset Line Item Projects: (Pre-RCACAP) Projects completed within 110% of CD-2 ... Projects: (Pre- RACCAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. ...

  4. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed ... projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup ...

  5. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects: (Pre-RCACAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. ... Projects: (Pre- RACCAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. ...

  6. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    SciTech Connect (OSTI)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  7. Miamisburg Environmental Management Project Archived Soil & Groundwate...

    Office of Environmental Management (EM)

    Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports...

  8. Fernald Environmental Management Project Archived Soil & Groundwater...

    Office of Environmental Management (EM)

    Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald...

  9. Project Management | Department of Energy

    Energy Savers [EERE]

    Project Management Project Management CD-0 Approval of Mission Need CD-1 Approval of Alternative CD-4 Approval of Project Completion CD-3 Approval to Start Construction CD-2 Approval of Performance Baseline Financial Closeout Complete CD-0 CD-1 CD-4 CD-3 CD-2 INITIATION DEFINITION EXECUTION CLOSEOUT Project Directors are responsible for the planning, programming, budgeting and acquisition of capital assets. One of the principal outcomes in exercising this responsibility is the delivery of

  10. Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Project Management Workers safely demolished a 175-foot-high exhaust stack at the Hanford Site in southeastern Washington State, a project supported by $420,000 in Recovery Act funds. Workers safely demolished a 175-foot-high exhaust stack at the Hanford Site in southeastern Washington State, a project supported by $420,000 in Recovery Act funds. EM CAPITAL PORTFOLIO EM is tasked with solving the large scale, technically challenging risks and hazardous conditions posed by the

  11. Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Project Management Project Directors are responsible for the planning, programming, budgeting and acquisition of capital assets. One of the principal outcomes in exercising this responsibility is the delivery of projects on schedule, within budget, with the required performance capability, and compliant with quality, environmental, safety and health standards. These web pages identify the DOE requirements related to the acquisition of capital assets and present a common

  12. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. ... projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup ...

  13. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year ... projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup ...

  14. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCACAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: ...

  15. Project Management Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corporate Implementation Plan EM Contractors for Capital Asset Projects Acquisition and Project Management Continuous Improvement Presentation Acquisition and Project ...

  16. Office of Project Management Oversight & Assessments | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Office of Project Management Oversight & Assessments Career Development Project Management Career Development Program (DOE Only) Acquisition Career Management Program (DOE Only)...

  17. TPA Project Manager's Lists - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TPA Project Manager's Lists Tri-Party Agreement The Agreement Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management...

  18. NNSA project receives DOE Secretary's Award for Project Management...

    National Nuclear Security Administration (NNSA)

    project receives DOE Secretary's Award for Project Management Improvement | National ... Blog Home NNSA Blog NNSA project receives DOE Secretary's Award for ... NNSA project ...

  19. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). ... projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup ...

  20. Career Map: Project Manager | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manager Career Map: Project Manager A project manager and several workers stand over a large sheet of paper. Project Manager Position Title Project Manager Alternate Title(s) n/a Education & Training Level Bachelors required, prefer graduate degree Education & Training Level Description Experience in construction management, particularly wind plant construction, is vital for project managers. Most managers have experience working on several wind plant projects before they are selected to

  1. Project Hanford management contract quality improvement project management plan

    SciTech Connect (OSTI)

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  2. Project Management Practices

    Broader source: Energy.gov (indexed) [DOE]

    Version) See Figure 3-3. 19. Administrative Controls 1. Provisions relating to organization and management, procedures, recordkeeping, assessment, and reporting necessary to...

  3. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  4. Albeni Falls Wildlife Mitigation Project; Idaho Department of Fish and Game 2007 Final Annual Report.

    SciTech Connect (OSTI)

    Cousins, Katherine

    2009-04-03

    The Idaho Department of Fish and Game maintained a total of about 2,743 acres of wildlife mitigation habitat in 2007, and protected another 921 acres. The total wildlife habitat mitigation debt has been reduced by approximately two percent (598.22 HU) through the Department's mitigation activities in 2007. Implementation of the vegetative monitoring and evaluation program continued across protected lands. For the next funding cycle, the IDFG is considering a package of restoration projects and habitat improvements, conservation easements, and land acquisitions in the project area.

  5. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    SciTech Connect (OSTI)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  6. IT Project Management Profile | Department of Energy

    Energy Savers [EERE]

    Project Management Profile IT Project Management Profile This is a form that must be completed to initiate the assessment of a Project Manager to determine the level of qualification PDF icon IT Project Management Profile More Documents & Publications IT Project Management Profile FEDERAL ACQUISITION CERTIFICATION FOR PROGRAM AND PROJECT MANAGERS (FAC-P/PM) Systems and Professional Development - David Brown, Director, Systems & Professional Development, OAPM

  7. IT Project Management Profile | Department of Energy

    Office of Environmental Management (EM)

    Project Management Profile IT Project Management Profile This form lists positions/experience and training relating to project management; include other positions/experience or training if relevant PDF icon IT Project Management Profile More Documents & Publications IT Project Management Profile FEDERAL ACQUISITION CERTIFICATION FOR PROGRAM AND PROJECT MANAGERS (FAC-P/PM) Systems and Professional Development - David Brown, Director, Systems & Professional Development, OAPM

  8. Information Technology Project Management - DOE Directives, Delegation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5.1 Admin Chg 1, Information Technology Project Management by Denise Hill Functional areas: Administrative Change, Information Technology, Project Management, The Order provides...

  9. Jefferson Lab Project Management & Integrated Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Manager (757) 269-7511, rode@jlab.org Program Development & Planning The Program Development function of Project Management Office serves three main purposes: 1. Monitor...

  10. DOE Financial Assistance Awards: Active Project Management |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financial Assistance Awards: Active Project Management DOE Financial Assistance Awards: Active Project Management Presentation by Jim Alkire during the May 15 working lunch session ...

  11. Acquisition and Project Management Continuous Improvement Presentation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Presentation Presentation on Acquisition and Project Management Continuous Improvement. PDF icon Acquisition and Project Management Continuous Improvement presentation More Documents & Publications Occupational Safety Performance Voluntary Protection Program Onsite Review, Safeguards and Security - August 2012 Report on Acquisition and Project

  12. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  13. DOE Office of Environmental Management Project and Contract Management

    Energy Savers [EERE]

    Improvement Timeline | Department of Energy Acquisition » DOE Office of Environmental Management Project and Contract Management Improvement Timeline DOE Office of Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. View some highlights of EM's improvement actions here. PDF icon DOE Office of Environmental Management Contract and Project

  14. Managing Large Capital Projects | Department of Energy

    Energy Savers [EERE]

    Managing Large Capital Projects Managing Large Capital Projects Presentation from the 2015 DOE National Cleanup Workshop by Ken Picha, Deputy Assistant Secretary for Tank Waste and Nuclear Material, Office of Environmental Management. PDF icon Managing Large Capital Projects More Documents & Publications Waste Treatment Plant Project Construction of Salt Waste Processing Facility (SWPF) 2013 Congressional Nuclear Cleanup Caucus Briefings

  15. EA-1160: Northeast Oregon Wildlife Mitigation Project, Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the U.S. Department of Energy Bonneville Power Administration's proposal to enter into an agreement with the Nez Perce Tribe to acquire and manage...

  16. Improving Project Management | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Improving Project Management Improving Project Management Secretary of Energy Ernest Moniz has made improving project management a priority at the Energy Department. In August 2013, the Secretary established a special working group that includes project management experts from across the Department. Over the past year, this group's in-depth analysis culminated in a new report titled Improving Project Management. The report provides valuable case studies and recommendations regarding funding,

  17. Project Management Coordination Office | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Coordination Office Project Management Coordination Office The Project Management Coordination Office (PMCO) provides guidance, leadership, training, and tools in program and project management.to Office of Energy Efficiency and Renewable Energy (EERE) Headquarters and field employees. PMCO is an internal business operations office with a mission to provide EERE executive managers, line managers, and staff offices the unified corporate tools, products, and services that enable

  18. CNS Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CNS Project Management CNS Project Management CNS Project Management The experience with major nuclear design and construction projects continues to highlight the importance of a focused, technically rigorous, and standardized approach to project reviews performed at Critical Decision (CD) approval points. This approach is fundamental to a positive safety culture and effective nuclear safety management. The CNS led the technical development of Standard Review Plans (SRPs). The SRPs are designed

  19. Report: EM Acquisition and Project Management

    Office of Environmental Management (EM)

    ACQUISITION AND PROJECT MANAGEMENT September 25, 2008 Submitted by the EMAB Acquisition and Project Management Subcommittee Background: In Fiscal Year (FY) 2008, EMAB was tasked to continue a review of the Office of Environmental Management's (EM) acquisition and project management practices in terms of its members' own industry standards, and to continue to work with Office of Acquisition and Project Management (EM-50) on its initiatives, providing advice and consultation as appropriate. The

  20. Wildlife Impact Assessment Palisades Project, Idaho, Final Report.

    SciTech Connect (OSTI)

    Sather-Blair, Signe

    1985-02-01

    The Habitat Evaluation Procedures were used to evaluate pre- and post-construction habitat conditions of the US Bureau of Reclamation's Palisades Project in eastern Idaho. Eight evaluation species were selected with losses expressed in the number of Habitat Units (HU's). One HU is equivalent to one acre of prime habitat. The evaluation estimated that a loss of 2454 HU's of mule deer habitat, 2276 HU's of mink habitat, 2622 HU's of mallard habitat, 805 HU's of Canada goose habitat, 2331 HU's of ruffed grouse habitat, 5941 and 18,565 HU's for breeding and wintering bald eagles, and 1336 and 704 HU's for forested and scrub-shrub wetland nongame species occurred as a result of the project. The study area currently has 29 active osprey nests located around the reservoir and the mudflats probably provide more feeding habitat for migratory shore birds and waterfowl than was previously available along the river. A comparison of flow conditions on the South Fork of the Snake River below the dam between pre- and post-construction periods also could not substantiate claims that water releases from the dam were causing more Canada goose nest losses than flow in the river prior to construction. 41 refs., 16 figs., 9 tabs.

  1. Measuring Performance and Benchmarking Project Management

    Energy Savers [EERE]

    implemented. Monthly 4. Project management staffing Is project staffing adequate in terms of number and qualifications? Assessment scale from 1 (poor) to 5 (excellent)....

  2. CNS Project Management | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    CNS Project Management The experience with major nuclear design and construction projects continues to highlight the importance of a focused, technically rigorous, and standardized...

  3. Report: Acquisition, Project Management, and Quality Assurance...

    Office of Environmental Management (EM)

    Guide (March 2009) that pertain to the integration of Earned Value and Risk Management data for assessing project performance. o EM has initiated construction project reviews...

  4. NIM Guide for PIs and Project Managers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PIs NIM Guide for PIs and Project Managers NERSC Allocations Allocations are made to project accounts called repositories (repos). Every year Principal Investigators or their...

  5. Project Management Methodology | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    provides the tools and guidance necessary to ensure consistent and effective management oversight of performer performance and consolidated reporting. The project management...

  6. Project Manager's Guide to Managing Impact and Process Evaluation Studies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Project Manager's Guide to Managing Impact and Process Evaluation Studies Project Manager's Guide to Managing Impact and Process Evaluation Studies This report provides a step-by-step approach to help managers of EERE evaluation projects create and manage objective, high quality, independent, and useful impact and process evaluations. It provides information to help with the following: Determine why, what and when to evaluate; identify the questions that need to be

  7. Update on Service Management project

    ScienceCinema (OSTI)

    None

    2011-04-25

    GS and IT Service Management project status meeting -------------------------------------------------------------------------- Distribution: Sigurd Lettow, Frederic Hemmer, Thomas Pettersson, David Foster, Matti Tiirakari, GS⁢ Service Providers When and where: Thursday 2nd September at 10:00-11:30 in IFiltration Plant (222-R-001) Dear All, We would like to inform you about progress made on different topics like the Service Catalogue, the new Service Management Tool and the Service Desk. We would also like to present the plan for when we hope to "go live" and what this will mean for all of you running and providing services today. We will need your active support and help in the coming months to make this happen. GS⁢ Service Management Teams Reinoud Martens, Mats Moller

  8. Project Management Coordination Office Organization Chart

    Broader source: Energy.gov [DOE]

    Project Management Coordination Office Organization Chart, U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

  9. Project Management Expectations for Financial Assistance Activities

    Broader source: Energy.gov [DOE]

    Memo on Project Management Expectations for Financial Assistance Activities from David K. Garman, dated June 23, 2006.

  10. Finance and supply management project execution plan

    SciTech Connect (OSTI)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  11. Spent Nuclear Fuel Project Safety Management Plan

    SciTech Connect (OSTI)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities.

  12. Are We There Yet? - Mike Peek, Director, Project Management ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Are We There Yet? - Mike Peek, Director, Project Management (MA-63) Are We There Yet? - Mike Peek, Director, Project Management (MA-63) 2014 DOE Project Management Workshop PDF...

  13. Project Management Update - Paul Bosco, Director, Office of Acquisitio...

    Office of Environmental Management (EM)

    Project Management Update - Paul Bosco, Director, Office of Acquisition & Project Mgt Project Management Update - Paul Bosco, Director, Office of Acquisition & Project Mgt 2014 DOE...

  14. Management of wildlife causing damage at Argonne National Laboratory-East, DuPage County, Illinois

    SciTech Connect (OSTI)

    1995-04-01

    The DOE, after an independent review, has adopted an Environmental Assessment (EA) prepared by the US Department of Agriculture (USDA) which evaluates use of an Integrated Wildlife Damage Management approach at Argonne National Laboratory-East (ANL-E) in DuPage County, Illinois (April 1995). In 1994, the USDA issued a programmatic Environmental Impact Statement (EIS) that covers nationwide animal damage control activities. The EA for Management of Wildlife Causing Damage at ANL-E tiers off this programmatic EIS. The USDA wrote the EA as a result of DOE`s request to USDA to prepare and implement a comprehensive Wildlife Management Damage Plan; the USDA has authority for animal damage control under the Animal Damage Control Act of 1931, as amended, and the Rural Development, Agriculture and Related Agencies Appropriations Act of 1988. DOE has determined, based on the analysis in the EA, that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an EIS is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI).

  15. 4.1 PROJECT MANAGER ROLE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-1 4.0 AGREEMENT MANAGEMENT 4.1 PROJECT MANAGER ROLE The DOE and the lead regulatory agency(ies) (see Section 5.6 for discussion of lead regulatory agency) shall each designate an individual as a project manager for each operable unit, TSD group/unit or specific milestone to be completed under this Agreement. Project managers will only be identified for those areas where effort is ongoing or planned in the near future. A listing of currently assigned project managers shall be maintained and

  16. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    SciTech Connect (OSTI)

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  17. Project Manager Ned Sauthoff Talks About US ITER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ITER Project Manager Ned Sauthoff Talks About US ITER

  18. Report: Small Business, Acquisition, and Project Management

    Office of Environmental Management (EM)

    SMALL BUSINESS, ACQUISITION, AND PROJECT MANAGEMENT Background In FY 2007 EMAB was tasked to dialogue with the Office of Acquisition and Project Management (EM-50) on the topic of Small Business and provide advice and recommendations drawn from EMAB members' experience in commercial industry. Additionally, EMAB continued to review and discuss the topics of Acquisition and Project Management during its public meetings and in exchanges with EM senior personnel. Discussion In FY 2006, EM's small

  19. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Project Management Oversight Office of Project Management Oversight Fermilab Management/Non-Scientific Projects Current Management Projects IARC OTE Building Liquid Argon Test Building (LArTB) TeV Decommissioning ORKA Preservation Task Force Completed Management Projects Lab-Wide Earned Value Management Systems (EVMS) Lab-Wide WBS Update Project Last modified: 03/05/2012

  20. NNSA project receives DOE Secretary's Award for Project Management

    National Nuclear Security Administration (NNSA)

    Improvement | National Nuclear Security Administration project receives DOE Secretary's Award for Project Management Improvement | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios

  1. Designation of Environmental Management Federal Project Director...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Federal Project Director for Brookhaven National Laboratory by sattler DesignationofEMFedProjDir-BNL-SattlerEM.pdf -- PDF Document, 240 KB ID: NA Type:...

  2. Designation of Environmental Management Federal Project Director...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Federal Project Director for Separations Process Research Unit by feinberg DesignationofEMFedProjDir-SeparationsProcessResearchUnit-FeinbergEM.pdf -- PDF...

  3. Office of Acquisition and Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... and sustainability factors into these projects; to ... and implements the Small Business Innovative Research ... The office also manages the EM organizational assessment ...

  4. Improving Project Management | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Secretary of Energy Ernest Moniz has made improving project management a priority at the Energy Department. In August 2013, the Secretary established a special working group that...

  5. 2015 DOE Acquisition and Project Management Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Break Acquisition and Project Management Awards Presentations Welcome & Workshop Logistics Welcome & Workshop Logistics No Host Reception at Hotel 2015 DOE Acquisition and...

  6. Acquisition and Project Management Awards Presentations - Ingrid...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Ingrid Kolb, Director, Office of Management Secretary's Achievement Award Seismic Life-Safety, Modernization & Replacement (Seismic Ph 2)Secretary's Award for Project...

  7. 2014 DOE Project Management Workshop Presentations | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1. PM Update - Paul Bosco, Director, Office of Acquisition & Project Management 2. Ethics - Marianne Jennings, W.P. Carey School of Business at Arizona State University 3. ...

  8. Project Management Institute Highlights Savannah River Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Institute Highlights Savannah River Nuclear Solutions in Publication Project Management Institute Highlights Savannah River Nuclear Solutions in Publication February 6, 2014 -...

  9. Oregon Trust Agreement Planning Project : Potential Mitigations to the Impacts on Oregon Wildlife Resources Associated with Relevant Mainstem Columbia River and Willamette River Hydroelectric Projects.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1993-10-01

    A coalition of the Oregon wildlife agencies and tribes (the Oregon Wildlife Mitigation Coalition) have forged a cooperative effort to promote wildlife mitigation from losses to Oregon wildlife resources associated with the four mainstream Columbia River and the eight Willamette River Basin hydroelectric projects. This coalition formed a Joint Advisory Committee, made up of technical representatives from all of the tribes and agencies, to develop this report. The goal was to create a list of potential mitigation opportunities by priority, and to attempt to determine the costs of mitigating the wildlife losses. The information and analysis was completed for all projects in Oregon, but was gathered separately for the Lower Columbia and Willamette Basin projects. The coalition developed a procedure to gather information on potential mitigation projects and opportunities. All tribes, agencies and interested parties were contacted in an attempt to evaluate all proposed or potential mitigation. A database was developed and minimum criteria were established for opportunities to be considered. These criteria included the location of the mitigation site within a defined area, as well as other criteria established by the Northwest Power Planning Council. Costs were established for general habitats within the mitigation area, based on estimates from certified appraisers. An analysis of the cost effectiveness of various types of mitigation projects was completed. Estimates of operation and maintenance costs were also developed. The report outlines strategies for gathering mitigation potentials, evaluating them, determining their costs, and attempting to move towards their implementation.

  10. PROJECT MANGEMENT PLAN EXAMPLES Project Management Plan Examples

    Office of Environmental Management (EM)

    Management Plan Examples The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The elements table below should be used to navigate to the subject of interest. Elements of Deactivation Project Planning Deactivation Project Key Planning Elements Reference DOE O 430.1A Reference DOE G 430.1-3 DOE G 430.1- 3 Fig. 1 Link to Examples Policy & Operational Decisions, Assumptions and Strategies Includes organizational

  11. Systems approach to project risk management

    SciTech Connect (OSTI)

    Kindinger, J. P.

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  12. 2013 Awards for Project Management | Department of Energy

    Energy Savers [EERE]

    3 Awards for Project Management 2013 Awards for Project Management Federal Project Director of the Year for 2013: Everett Trollinger (National Nuclear Security Administration)...

  13. Federal Energy Management Program Renewable Energy Project Assistance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy Projects Federal Energy Management Program Renewable Energy Project Assistance Federal Energy Management Program Renewable Energy Project Assistance The Federal ...

  14. Staffing Guide for Project Management - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19 Admin Chg 1, Staffing Guide for Project Management by Brian Kong Functional areas: Administrative Change, Program Management, Project Management This Guide provides an approach...

  15. Miamisburg Environmental Management Project Archived Soil & Groundwater

    Office of Environmental Management (EM)

    Master Reports | Department of Energy Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports PDF icon Miamisburg Environmental Management Project - OU-1 PDF icon Miamisburg Environmental Management Project - Tributary Valley VOCs PDF icon Miamisburg Environmental Management

  16. Project Management Career Development Program | Department of Energy

    Energy Savers [EERE]

    Operational Management » Certifications and Professional Development » Project Management Career Development Program Project Management Career Development Program All PMCDP-related information has been moved to Powerpedia - Project Management Career Development Program.

  17. Project Management Career Development Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    You are here Home » Operational Management » Certifications and Professional Development » Project Management Career Development Program Project Management Career Development Program All PMCDP-related information has been moved to Powerpedia - Project Management Career Development Program.

  18. 2016 DOE Project Management Workshop | Department of Energy

    Energy Savers [EERE]

    Services » Project Management » 2016 DOE Project Management Workshop 2016 DOE Project Management Workshop 2016 DOE Project Management Workshop Workshop Details: What: 2016 DOE Project Management Workshop When: March 22-23, 2016. In addition, a select few will remain a third day for the Project Controls Workshop (March 24) to discuss ongoing initiatives to improve integration of project controls and earned value with project management. Where: Sheraton Pentagon City Hotel, 900 South Orme

  19. Tucson Solar Village: Project management

    SciTech Connect (OSTI)

    Not Available

    1991-11-01

    The Tucson Solar Village is a Design/Build Project In Sustainable Community Development which responds to a broad spectrum of energy, environmental, and economic challenges. This project is designed for 820 acres of undeveloped State Trust Land within the Tucson city limits; residential population will be five to six thousand persons with internal employment provided for 1200. This is a 15 year project (for complete buildout and sales) with an estimated cost of $500 million. Details of the project are addressed with emphasis on the process and comments on its transferability.

  20. Fernald Environmental Management Project Archived Soil & Groundwater Master

    Office of Environmental Management (EM)

    Reports | Department of Energy Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald Environmental Management Project Archived Soil & Groundwater Master Reports PDF icon Fernald Environmental Management Project - Fernald PDF icon Fernald Environmental Management Project - Great Miami Aquifer More Documents & Publications Ashtabula Archived Soil &

  1. Secretary's 2014 Award for Project Management Improvement | Department of

    Energy Savers [EERE]

    Energy for Project Management Improvement Secretary's 2014 Award for Project Management Improvement PDF icon Nuclear Materials Safeguards & Security Upgrades (NMSSUP) Project (The National Nuclear Security Administration) More Documents & Publications 2014 Awards for Project Management Secretary's 2014 Achievement Awards Acquisition and Project Management Awards Presentations - Ingrid Kolb, Director, Office of Management

  2. Staffing Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-03

    This Guide provides an approach to determining the appropriate level and type of federal personnel needed to effectively plan, direct, and oversee project execution. Admin Chg 1, dated 10-12-11, cancels DOE G 413.3-19.

  3. Wildlife Mitigation and Restoration for Grand Coulee Dam: Blue Creek Project, Phase 1.

    SciTech Connect (OSTI)

    Merker, Christopher

    1993-04-01

    This report is a recommendation from the Spokane Tribe to the Northwest Power Planning Council (NPPC) for partial mitigation for the extensive wildlife and wildlife habitat losses on the Spokane Indian Reservation caused by the construction of Grand Coulee Dam. NPPC`s interim wildlife goal over the next 7 years for the Columbia hydropower system, is to protect, mitigate and enhance approximately 35% basin wide of the lost habitat units. Grand Coulee Dam had the greatest habitat losses of any Dams of the Wildlife Rule.

  4. U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT U.S. DEPARTMENT OF ENERGY CONTRACT AND PROJECT MANAGEMENT PDF icon...

  5. Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-38)

    SciTech Connect (OSTI)

    N /A

    2004-01-14

    BPA proposes to purchase the conservation easements on the Sanders (307 acres) and Seabaugh (449 acres) parcels of the Weaver Slough to ensure that current fisheries and natural resource values remain protected, and that no development or human encroachment would occur on these parcels, in perpetuity. No planned construction or improvements are currently proposed and the project does not involve fee title land acquisition. Protection will sustain quality aquatic habitats, water quality, and fish and wildlife habitat. Wetlands protected by this easement are priority wetlands in the basin, according to the Flathead Lakers Critical Lands Study. A ''Grant of Agricultural Conservation Easement'' has been prepared for both the Sanders parcel (Nov. 21, 2003) and Seabaugh parcel (December 4, 2003) which provide the parameters, rights and responsibilities, prohibitions, contingencies, and other provisions for the granting these properties for the above purpose and intent. In addition, a Memorandum of Agreement (among the Montana Department of Fish, Wildlife and Parks; Flathead Land Trust; and BPA) has also been established to protect and conserve the Sanders and Seabaugh parcels.

  6. Waste management project technical baseline description

    SciTech Connect (OSTI)

    Sederburg, J.P.

    1997-08-13

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

  7. Project Management Information Systems (PMIS) | Department of Energy

    Energy Savers [EERE]

    Project Management Information Systems (PMIS) Project Management Information Systems (PMIS) Project Management Information Systems (PMIS) Project Assessment & Reporting System (PARS IIe) Office of Project Management Oversight & Assessments (PM) manages and operates Project Assessment and Reporting System (PARS IIe) - the Department's official "System of Record" for project information, documentation, and performance data of all non-IT Capital Asset Acquisitions. It is used by

  8. Project Management Perspective - Paul Bosco, Director, Office of

    Energy Savers [EERE]

    Acquisition and Project Management | Department of Energy Project Management Perspective - Paul Bosco, Director, Office of Acquisition and Project Management Project Management Perspective - Paul Bosco, Director, Office of Acquisition and Project Management Agenda Project Portfolio and Trends Project Success Metrics Other Performance Metrics GAO High-Risk Series Update GAO's Shift in Focus Areas of Concern PDF icon Workshop 2015 - Paul Bosco - PM Perspective.pdf More Documents &

  9. Staffing Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-03

    This Guide provides an approach to determining the appropriate level and type of federal personnel needed to effectively plan, direct, and oversee project execution. Admin Chg 1, dated 10-12-11, cancels DOE G 413.3-19. Admin Chg 2 dated 10-22-2015.

  10. Best-In-Class Project Management Initiative Corporate Implementation Plan |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Best-In-Class Project Management Initiative Corporate Implementation Plan Best-In-Class Project Management Initiative Corporate Implementation Plan To continue Project Management and Contract Management Improvements, DOE EM has developed a vision for building a "Best-in-Class" Project Management and Contract Management organization. Click here to read the Corporate Initiative Plan. PDF icon Best-in-Class Project Management Initiative Corporate Implementation

  11. Status Review of Wildlife Mitigation at Columbia Basin Hydroelectric Projects, Oregon Facilities, Final Report.

    SciTech Connect (OSTI)

    Bedrossian, Karen L.

    1984-08-01

    The report presents a review and documentation of existing information on wildlife resources at Columbia River Basin hydroelectric facilities within Oregon. Effects of hydroelectric development and operation; existing agreements; and past, current and proposed wildlife mitigation, enhancement, and protection activities were considered. (ACR)

  12. Quality Assurance Guide for Project Management - DOE Directives...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, Quality Assurance Guide for Project Management by John Makepeace Functional areas: Project Management, Quality Assurance and Oversight This Guide provides acceptable approaches...

  13. Request Access to the PARSIIe Project Management Lessons Learned...

    Energy Savers [EERE]

    Request Access to the PARSIIe Project Management Lessons Learned (PMLL) Repository Request Access to the PARSIIe Project Management Lessons Learned (PMLL) Repository PURPOSE...

  14. FY 2016 Overall Contract and Project Management Improvement Performanc...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY 2016 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2016, ...

  15. Program & Project Management For The Acquisition Of Capital Assets...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets PARS II...

  16. 2015 DOE Acquisition and Project Management Workshop Agenda ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Acquisition and Project Management Workshop Agenda 2015 DOE Acquisition and Project Management Workshop Agenda This year's theme is "Federal Stewardship-- Providing the Value...

  17. DRAFT 2012 DOE Project Management Workshop Agenda | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT 2012 DOE Project Management Workshop Agenda DRAFT 2012 DOE Project Management Workshop Agenda PDF icon 2012 Workshop AgendaVer25 (For Distribution).pdf More Documents &...

  18. EERE Project Management Center Database PIA, The Office of Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Project Management Center Database PIA, The Office of Energy Efficiency and Renewable Energy (EERE) EERE Project Management Center Database PIA, The Office of Energy...

  19. 2014 DOE Project Management Workshop Attendees List | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Project Management Workshop Attendees List 2014 DOE Project Management Workshop Attendees List PDF icon 2014 PM Workshop Attendees ListName & Office.pdf More Documents &...

  20. UNEP-GEF Renewable Energy Project Financial Risk Management in...

    Open Energy Info (EERE)

    GEF Renewable Energy Project Financial Risk Management in Developing Countries Jump to: navigation, search Name UNEP-GEF Renewable Energy Project Financial Risk Management in...

  1. Active Network Management (Smart Grid Project) | Open Energy...

    Open Energy Info (EERE)

    Network Management (Smart Grid Project) Jump to: navigation, search Project Name Active Network Management Country United Kingdom Coordinates 55.378052, -3.435973 Loading...

  2. Acquisition and Project Management Office volunteers get up-close...

    National Nuclear Security Administration (NNSA)

    Our Jobs Our Jobs Working at NNSA Blog Home NNSA Blog Acquisition and Project Management Office volunteers get ... Acquisition and Project Management Office volunteers get...

  3. Project Management Update - Paul Bosco, Director, Office of Acquisition &

    Office of Environmental Management (EM)

    Project Mgt | Department of Energy Update - Paul Bosco, Director, Office of Acquisition & Project Mgt Project Management Update - Paul Bosco, Director, Office of Acquisition & Project Mgt 2014 DOE Project Management Workshop PDF icon PM Update - Paul Bosco, Director, Office of Acquisition & Project Mgt More Documents & Publications Project Management Perspective - Paul Bosco, Director, Office of Acquisition and Project Management Are We There Yet? - Mike Peek, Director,

  4. Commercialization and Project Management PIA, Golden Field Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Commercialization and Project Management PIA, Golden Field Office Commercialization and Project Management PIA, Golden Field Office Commercialization and Project Management PIA, Golden Field Office PDF icon Commercialization and Project Management PIA, Golden Field Office More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software

  5. NA APM - Associate Administrator for Acquisition & Project Management...

    National Nuclear Security Administration (NNSA)

    APM - Associate Administrator for Acquisition & Project Management | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  6. Acquisition and Project Management Awards Presentations - Ingrid Kolb,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Director, Office of Management | Department of Energy and Project Management Awards Presentations - Ingrid Kolb, Director, Office of Management Acquisition and Project Management Awards Presentations - Ingrid Kolb, Director, Office of Management Secretary's Achievement Award Seismic Life-Safety, Modernization & Replacement (Seismic Ph 2)Secretary's Award for Project Management Improvement Nuclear Materials Safeguards & Security Upgrades (NMSSUP) Secretary's Achievement Award Security

  7. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OPMO Projects Office of Project Management Oversight (OPMO) OPMO Projects Organization and Human Asset Plan Last modified: 12/09/2011

  8. 2015 DOE Acquisition and Project Management (APM) Workshop Presentations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DOE Acquisition and Project Management (APM) Workshop Presentations 2015 DOE Acquisition and Project Management (APM) Workshop Presentations Time Presenter Topic Day 1 0820 Paul Bosco, Director, Office of Acquisition and Project Management Project Management Perspective 1000 Stephen Meador, Director, Office of Project Assessments, Science SC Projects Perspective 1400 David Kester, Defense Contract Management Agency EVMS - FROM DATA TO DIAGNOSIS - A DoD Perspective 1500

  9. Project management plan for Project W-320, Tank 241-C-106 sluicing

    SciTech Connect (OSTI)

    Phillips, D.R.

    1994-12-01

    This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987).

  10. Deputy Assistant Secretary for Acquisition and Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    J. E. "Jack" Surash Deputy Assistant Secretary for Acquisition and Project Management Office of Environmental Management United States Department of Energy Contract Management by...

  11. 2016 DOE Project Management Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2016 DOE Project Management Workshop 2016 DOE Project Management Workshop The Department of Energy Office of Project Management Oversight and Assessments (PM) is pleased to announce the 2016 Project Management Workshop. The workshop will continue the tradition of providing opportunities to discuss projects and project challenges with senior leadership, share lessons learned, and recognize excellence. The final day of this year's workshop will focus on project controls. As a designated training

  12. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Resources Resources Project Management References Sample Documents Reference Documents Office of Energy Research - Project Performance – E. Temple, Feb 1986 Geographical Information Systems and Document Management Integration, ESRI Conference 2007, Steve Sherman Web Resources Project Management Talks Fermilab Implementation of DOE Critical Decision Process: FRA Project Management System - E. Temple, Sep 10, 2008: Presentation: Slides | Video Last modified: 12/09/2011

  13. 2016 DOE Project Management Workshop - Biographies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biographies 2016 DOE Project Management Workshop - Biographies Biographies for this year's workshop are not yet available. Please check back later. PDF icon Biographies More Documents & Publications 2016 DOE Project Management Workshop - Presentations 2016 DOE Project Management Workshop - Agenda 2014 DEPARTMENT OF ENERGY PROJECT MANAGEMENT WORKSHOP

  14. project management | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    project management | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA

  15. Fish and Wildlife Administrator

    Broader source: Energy.gov [DOE]

    This position is located in the Planning and Policy organization (EWP) in the Division of Environment, Fish & Wildlife, Bonneville Power Administration (BPA) and reports to the EWP manager....

  16. Contacts for IT Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Contacts for IT Project Management Denise Hill Senior Technical Advisor Office of the Chief Information Officer U.S. Department of Energy 202.586.5848 ITProjectManagement

  17. FEDERAL ACQUISITION CERTIFICATION FOR PROGRAM AND PROJECT MANAGERS

    Energy Savers [EERE]

    (FAC-P/PM) | Department of Energy FEDERAL ACQUISITION CERTIFICATION FOR PROGRAM AND PROJECT MANAGERS (FAC-P/PM) FEDERAL ACQUISITION CERTIFICATION FOR PROGRAM AND PROJECT MANAGERS (FAC-P/PM) FEDERAL ACQUISITION CERTIFICATION FOR PROGRAM AND PROJECT MANAGERS (FAC-P/PM) PDF icon FEDERAL ACQUISITION CERTIFICATION FOR PROGRAM AND PROJECT MANAGERS (FAC-P/PM) More Documents & Publications Happy Valentine's Day and President's Day weekend from the Office of Project Management Oversight and

  18. Poneman Joins EM Contract and Project Management Workshop | Department of

    Energy Savers [EERE]

    Energy Poneman Joins EM Contract and Project Management Workshop Poneman Joins EM Contract and Project Management Workshop June 7, 2013 - 12:00pm Addthis Deputy Secretary Daniel Poneman talks to participants in EM's Contract and Project Management Workshop this week. Deputy Secretary Daniel Poneman talks to participants in EM's Contract and Project Management Workshop this week. EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash discusses EM's current contract

  19. Improving Project Management at the Department of Energy | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Project Management at the Department of Energy Improving Project Management at the Department of Energy December 19, 2014 - 12:15pm Addthis Improving Project Management at the Department of Energy John J. MacWilliams John J. MacWilliams Associate Deputy Secretary Read the Report Learn more by reading the full Improving Project Management report. Secretary Ernest Moniz has made improving project management a priority at the Energy Department. In August 2013, the Secretary established a

  20. Meeting the Challenge: Integrating Acquisition and Project Management - J.

    Energy Savers [EERE]

    E. Surash, P.E. | Department of Energy Meeting the Challenge: Integrating Acquisition and Project Management - J. E. Surash, P.E. Meeting the Challenge: Integrating Acquisition and Project Management - J. E. Surash, P.E. 2014 DOE Project Management Workshop PDF icon Meeting the Challenge: Integrating Acquisition and Project Management - J. E. Surash, P.E. More Documents & Publications EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project

  1. Project Management Information Systems (PMIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Information Systems (PMIS) Project Management Information Systems (PMIS) Project Assessment & Reporting System (PARS IIe) Office of Project Management Oversight & Assessments (PM) manages and operates Project Assessment and Reporting System (PARS IIe) - the Department's official "System of Record" for project information, documentation, and performance data of all non-IT Capital Asset Acquisitions. It is used by Federal and contractor personnel across the

  2. 2012 Awards for Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Awards for Project Management 2012 Awards for Project Management Federal Project Director of the Year for 2012 Mr. Hannibal Joma The 2012 Secretary Achievement Award The Office of Environment Management's K-33 Gaseous Diffusion Process Building Project The Office of Science Daya Bay Reactor Neutrino Detector Project The Office of Environmental Management's Idaho Nuclear facility Decontamination & Decommissioning Project More Documents & Publications PM Workshop 2012 Awards Recognition

  3. AVLIS Production Plant Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  4. Project Management Lessons Learned (PMLL) Repository | Department of Energy

    Energy Savers [EERE]

    Information Systems » Project Management Lessons Learned (PMLL) Repository Project Management Lessons Learned (PMLL) Repository The Department of Energy utilizes Project Management Lessons Learned (PMLL) in the execution of DOE capital asset projects to improve current and future projects. Integrated Project Team's (IPTs), both from the Contractor and Federal staff, submit the PMLLs during the execution of capital asset projects. These first-hand accounts address the challenges they encountered

  5. A New Tool for Effective and Efficient Project Management

    SciTech Connect (OSTI)

    Willett, Jesse A.

    2011-12-01

    Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

  6. Nevada Department of Wildlife | Open Energy Information

    Open Energy Info (EERE)

    Wildlife (NDOW) is the state agency responsible for the restoration and management of fish and wildlife resources, and the promotion of boating safety on Nevada's waters. NDOW is...

  7. Improving the Department's Management of Projects | Department of Energy

    Energy Savers [EERE]

    the Department's Management of Projects Improving the Department's Management of Projects DOE is managing some of the largest, most complex, and technically challenging projects in the public or private sector. Many are one-of-a-kind projects that involve the risks and challenges of nuclear operations. The Department made significant progress over the past five years in improving overall project management, and in 2013 the GAO narrowed its High-Risk List focus at the Department to NNSA and EM

  8. Project Management Career Development Program | Department of Energy

    Energy Savers [EERE]

    Management Career Development Program Project Management Career Development Program The Project Management Career Development Program (PMCDP) in Office of Project Management Oversight and Assessments was established in 2001 by a Congressional mandate to ensure the Department of Energy (DOE) has well qualified and experienced Federal Project Directors (FPDs) to oversee the agency's diverse portfolio of highly-technical construction, experimental equipment and environmental cleanup projects. The

  9. 2012 Department of Energy Project Management Workshop | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 2 Department of Energy Project Management Workshop 2012 Department of Energy Project Management Workshop 2012 Department of Energy Project Management Workshop ******************** UPDATE: Presentations from the workshop are now available here. ******************** What: 2012 Department of Energy Project Management Workshop. Please see invitation from the Director, Office of Management. When: Tuesday and Wednesday, April 3 & 4, 2012 Where: Hilton Alexandria Mark Center, 5000

  10. Office of Project Management Oversight & Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Project Management Oversight & Assessments Office of Project Management Oversight & Assessments Career Development Project Management Career Development Program (DOE Only) Acquisition Career Management Program (DOE Only) Federal Acquisition Institute PARS IIe Important Links PARS IIe Access Request PARS IIe Login PARS IIe Training Reset Your Password Download December 2015 Dashboard Leadership Paul Bosco Director, Office of Project Management Oversight & Assessments More

  11. 2013 Awards for Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Awards for Project Management 2013 Awards for Project Management Federal Project Director of the Year for 2013: Everett Trollinger (National Nuclear Security Administration) Secretary's Award of Excellence: Chemistry & Metallurgy Research Building Replacement Project/Radiological Lab Utility Office Building Equipment Installation (National Nuclear Security Administration) Secretary's Achievement Awards: Energy Systems Integration Facility Project (Office of Energy Efficiency and Renewable

  12. Project Management Quality Assurance Guide, GPG 017 | Department of Energy

    Energy Savers [EERE]

    Management Quality Assurance Guide, GPG 017 Project Management Quality Assurance Guide, GPG 017 LIFE CYCLE ASSET MANAGEMENT Good Practice Guide GPG-FM-017 Quality Assurance March 1996 Department of Energy Office of Field Management Office of Project and Fixed Asset Management PDF icon Project Management Quality Assurance Guide, GPG 017 More Documents & Publications DOE-STD-1054-93 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 Site Selection Proces

  13. Meeting the Challenge: Integrating Acquisition and Project Management...

    Broader source: Energy.gov (indexed) [DOE]

    Workshop Meeting the Challenge: Integrating Acquisition and Project Management - J. E. Surash, P.E. More Documents & Publications EM Projects Perspective - Jack Surash,...

  14. Jefferson Lab Project Management & Integrated Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vision: Partnering with our customers, we provide support to further the laboratory's mission to operate a world class user facility for conducting nuclear physics research. Our focus is to provide project management and integrated planning support across the Lab that is aligned with Lab goals, objectives and guidance. Mission: To ensure, through partnership with the Lab Leadership/staff, the successful conduct of the mission of the laboratory. As such, we provide technical and administrative

  15. NSTec Honors Employees Project Management Excellence Award,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Honors Employees Project Management Excellence Award, Performance Awards showcase outstanding work. Custodial staff show how they keep the NNSS clean and tidy. See page 4. See page 8. NNSS Responders Join FRMAC for Southern Exposure More than 60 federal and contractor employees joined state and local emergency officials in July for the Southern Exposure 2015 (SE-15) exercise in Florence, S.C. SE-15 was the largest national-level exercise at a nuclear power plant conducted since the terrorist

  16. Safeguards and Security Program and Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-18

    The proposed revision to this Department of Energy Guide focuses on alignment of guidance for implementing key safeguard and security components to the DOE capital asset acquisition process with the revised DOE O 413.3B, Program and Project Management for Acquisition of Capital Assets, the revised DOE O 470.4B, Safeguard and Security Program, and the new series of DOE Orders replacing the DOE M 470.4 series of manuals.

  17. Sound Project Management, Safe and Efficient Work Lead to Savings...

    Office of Environmental Management (EM)

    Sound Project Management, Safe and Efficient Work Lead to Savings for More Recovery Act Cleanup Sound management practices and safe, efficient work have led to cost savings and ...

  18. 2014 DOE Project Management Workshop Meeting the Challenge-Integrated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Are We There Yet? Project Management Update Break Office of Management & Performance Perspective Ethics Lunch FAITAS & PMCDP Tuesday, 25 March-- General Session Topic Registration ...

  19. Project Management and Systems Support | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    Project Management and Systems Support | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation...

  20. 2011 Awards for Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Awards for Project Management 2011 Awards for Project Management The Federal Project Director of the Year for 2011: David K. Arakawa (Office of Science) The Secretary's Award of Excellence: Physical Sciences Facility Project (Office of Science) The 2011 Secretary's Achievement Award: Research Support Facility Project (Office of Energy Efficiency and Renewable Energy) Spallation Neutron Source Instruments - Next Generation Project (Office of Science) Ion Beam Laboratory Project (National Nuclear

  1. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect (OSTI)

    Burritt, James G.; Berkey, Edgar

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  2. Program & Project Management For The Acquisition Of Capital Assets |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy More Documents & Publications Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets PARS II Enhancements - Igor Pedan, MA-63

  3. Microsoft PowerPoint - 05 Okonski final Project Management Workshop...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Okonski final Project Management Workshop Slides O'Konski Microsoft PowerPoint - 05 Okonski final Project Management Workshop Slides O'Konski PDF icon Microsoft PowerPoint - 05...

  4. GAO 2010 Project Management Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2010 Project Management Documents GAO 2010 Project Management Documents The following documents are included on this page: "DepSec Thank You Letter to GAO (19 May 2010)"; "GAO...

  5. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  6. 2014 DOE Project Management Workshop Presentations: PARS II Enhancements -

    Office of Environmental Management (EM)

    Igor Pedan, MA-63 | Department of Energy 4 DOE Project Management Workshop Presentations: PARS II Enhancements - Igor Pedan, MA-63 2014 DOE Project Management Workshop Presentations: PARS II Enhancements - Igor Pedan, MA-63 2014 DOE Project Management Workshop presentation by Igor Pedan. PDF icon Presentation More Documents & Publications PARS IIe CUI Training Slides Agenda Are We There Yet? - Mike Peek, Director, Project Management (MA-63)

  7. 2014 DEPARTMENT OF ENERGY PROJECT MANAGEMENT WORKSHOP | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy DEPARTMENT OF ENERGY PROJECT MANAGEMENT WORKSHOP 2014 DEPARTMENT OF ENERGY PROJECT MANAGEMENT WORKSHOP What: 2014 DOE Project Management Workshop (Meeting the Challenge-Integrated Acquisition & Project Management) When: Tuesday and Wednesday, March 25 & 26 2014 Where: Sheraton Pentagon City Hotel, 900 South Orme Street, Arlington, VA 22204 *Lunch is not included in this year's program. Click here for local food options. Sheraton Restaurant Menu Click here Who: DOE FPDs/Staff,

  8. FY 2016 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    Metrics and Targets | Department of Energy 6 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2016 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2016, first quarter through fourth quarter. PDF icon FY 2016 1st Quarter Metrics More Documents & Publications FY 2015 Overall Contract and Project Management Improvement Performance Metrics

  9. Contract and Project Management Improvement (CPMI) Closure Report -- April

    Energy Savers [EERE]

    2012 | Department of Energy Contract and Project Management Improvement (CPMI) Closure Report -- April 2012 Contract and Project Management Improvement (CPMI) Closure Report -- April 2012 The Department of Energy (DOE) is committed to making continuous improvements in contract and project management performance. One of the first steps the Department took to improve contract and project management was to hold a Root Cause Analysis (RCA) Workshop in 2007. Following the RCA Workshop, DOE

  10. Presentations from the 2012 DOE Project Management Workshop | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Presentations from the 2012 DOE Project Management Workshop Presentations from the 2012 DOE Project Management Workshop Please see below for copies of the presentations given at the the 2012 Department of Energy Project Management Workshop on April 3 & 4, 2012. Permission to post has not been recceived for some presentations -- these are marked, "NOT AVAILABLE." File 03.0855 Paul Bosco -- Project Management Success_0.pptx Plain text icon 03.0945 Tim Mitchell -- NOT

  11. Program and Project Management for the Acquisition of Capital Assets |

    Energy Savers [EERE]

    Department of Energy Program and Project Management for the Acquisition of Capital Assets Program and Project Management for the Acquisition of Capital Assets This Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental safety and health standards. Program and Project Management for the Acquisition of Capital Assets More Documents & Publications Guiding

  12. EERE Project Management Center Database PIA, The Office of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency and Renewable Energy (EERE) | Department of Energy EERE Project Management Center Database PIA, The Office of Energy Efficiency and Renewable Energy (EERE) EERE Project Management Center Database PIA, The Office of Energy Efficiency and Renewable Energy (EERE) EERE Project Management Center Database PIA, The Office of Energy Efficiency and Renewable Energy (EERE) PDF icon EERE Project Management Center Database PIA, The Office of Energy Efficiency and Renewable Energy (EERE) More

  13. 2014 DOE Project Management Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 DOE Project Management Workshop 2014 DOE Project Management Workshop What: 2014 DOE Project Management Workshop (Meeting the Challenge-Integrated Acquisition & Project Management) When: Tuesday and Wednesday, March 25 & 26 2014 Where: Sheraton Pentagon City Hotel, 900 South Orme Street, Arlington, VA 22204 *Lunch is not included in this year's program. Click here for local food options. Sheraton Restaurant Menu Click here Who: DOE FPDs/Staff, Program/Staff Office Reps, Contracting

  14. Project Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Management Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email

  15. U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S . DEP ARTMENT OF ENERGY CONTRACT AND P ROJ ECT MANAGEMENT ROOT CAUSE ANALYSIS AND CORRECTIVE ACTION P LAN CLOSURE REPORT FINAL FEBRUARY 2011 iii Executive Summary The Department of Energy (DOE) is committed to making continuous improvements in contract and project management performance. Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. While DOE's contract and project management has been on the Government

  16. Report on Acquisition and Project Management Continuous Improvement |

    Energy Savers [EERE]

    Department of Energy on Acquisition and Project Management Continuous Improvement Report on Acquisition and Project Management Continuous Improvement EM senior management has committed to extensive management reforms and has completed several robust improvements in contract and project management. Additional improvement initiatives are continuing and this document outlines the consolidated plan of these initiatives in a top-down framework of EM vision, goals, strategies, performance metrics,

  17. PROJECT PROFILE: Ra Power Management, Inc. (Incubator 10) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Ra Power Management, Inc. (Incubator 10) PROJECT PROFILE: Ra Power Management, Inc. (Incubator 10) Project Title: RPM Asset Management Platform (AMP) Funding Opportunity: SunShot Technology to Market (Incubator 10) SunShot Subprogram: Technology to Market Location: Oakland, CA Amount Awarded: $500,000 Awardee Cost Share: $125,000 Project Investigator: Aaron Iverson Ra Power Management, Inc. (RPM) is developing a cloud-based software platform that manages the financial and operational

  18. Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf |

    Energy Savers [EERE]

    Department of Energy Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf PDF icon Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf More Documents & Publications External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 DOE EIR FM.doc External Independent Review (EIR) Standard Operating Procedure (SOP) September 2010

  19. 2016 DOE Project Management Workshop - Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agenda 2016 DOE Project Management Workshop - Agenda The workshop agenda is not available at this time. Please check back later. PDF icon Agenda More Documents & Publications 2016 DOE Project Management Workshop - Biographies 2016 DOE Project Management Workshop - Presentations EM QA Working Group September 2011 Notes

  20. 2016 DOE Project Management Workshop - Presentations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Presentations 2016 DOE Project Management Workshop - Presentations The presentations for this year's workshop are not yet available. Please check back later. PDF icon Presentations More Documents & Publications 2016 DOE Project Management Workshop - Biographies 2016 DOE Project Management Workshop - Agenda BETO Monthly News Blast, June 2013

  1. 2014 Awards for Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Awards for Project Management 2014 Awards for Project Management Federal Project Director of the Year for 2014: Pepin Carolan (Office of Science) Secretary's Award of Excellence: Numi Off-axis electron neutrino (νe) Appearance (NOνA) Project (Office of Science) Secretary's Achievement Awards: Seismic Life-Safety, Modernization, and Replacement of General Purpose Buildings, Phase 2 Project (Office of Science) Security Improvements Project (The National Nuclear Security Administration) Energy

  2. 2011 DOE Project Management Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Project Management Workshop 2011 DOE Project Management Workshop Workshop Speakers and Presentations Paul Bosco, The New DOE O 413.3B Jeff Baker, EERE's Research Support Facility Patrick Ferraro, Contract Management/ Project Management Summit Outbrief Anirban Basu, Construction Economic Forecast John Curran, LED Lighting Michael Deane, Construction and Demolition Debris Recycle Mark Fallon, Leadership & Safety Cost Estimating Panel, The Science and Art of Cost Estimating Tom Fox, Leading

  3. Various Project Management Reports | U.S. DOE Office of Science...

    Office of Science (SC) Website

    Various Project Management Reports Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Department of Energy Office of Science Various Project...

  4. Project management plan for project W-320, tank 241-C-106 sluicing

    SciTech Connect (OSTI)

    Leliefeld, K.W.

    1996-02-02

    This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987). The sluicing is for retrieving high-heat waste from single shell tank 241-C-106.

  5. Fermilab | Directorate | Office of Project Management Oversight (OPMO)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Project Support Services (OPSS) Welcome to the Office of Project Support Services! The role of the Office of Project Support Services is to support the lab's large scientific and facility projects. Completing our projects on schedule and on budget requires careful planning and disciplined execution, especially since they typically involve technologies or approaches that have never been used. We work with project teams to establish standard project management processes, tools and

  6. Wildlife studies on the Hanford Site: 1993 Highlights report

    SciTech Connect (OSTI)

    Cadwell, L.L.

    1994-04-01

    The Pacific Northwest Laboratory (PNL) Wildlife Resources Monitoring Project was initiated by DOE to track the status of wildlife populations to determine whether Hanford operations affected them. The project continues to conduct a census of wildlife populations that are highly visible, economically or aesthetically important, and rare or otherwise considered sensitive. Examples of long-term data collected and maintained through the Wildlife Resources Monitoring Project include annual goose nesting surveys conducted on islands in the Hanford Reach, wintering bald eagle surveys, and fall Chinook salmon redd (nest) surveys. The report highlights activities related to salmon and mollusks on the Hanford Reach of the Columbia River; describes efforts to map vegetation on the Site and efforts to survey species of concern; provides descriptions of shrub-steppe bird surveys, including bald eagles, Canada geese, and hawks; outlines efforts to monitor mule deer and elk populations on the Site; and describes development of a biological database management system.

  7. Advanced Hybrid Particulate Collector Project Management Plan

    SciTech Connect (OSTI)

    Miller, S.J.

    1995-11-01

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

  8. Management and operating contractor plan for transition to the project Hanford Management Contractor

    SciTech Connect (OSTI)

    Waite, J.L., Westinghouse Hanford

    1996-06-27

    This is Revision 1 to the M{ampersand}O Contractor Plan for Transition to the Project Hanford Management Contractor.

  9. U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT

    Office of Environmental Management (EM)

    U.S. DEPARTMENT OF ENERGY CONTRACT AND PROJECT MANAGEMENT ROOT CAUSE ANALYSIS CORRECTIVE ACTION PLAN CORRECTIVE MEASURE 7 IMPROVE DOE OVERSIGHT AND MANAGEMENT OF PROJECTS, CONTRACTS, AND CONTRACTORS FINAL REPORT OCTOBER 2010 iii Executive Summary Opportunities remain within the U.S. Department of Energy [hereafter referred to as DOE or the Department and inclusive of the National Nuclear Security Admin- istration (NNSA)] for further improvement in the areas of contract and project management. A

  10. Secretary Moniz to Present Project Management Reforms to the National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Academy of Public Administration | Department of Energy to Present Project Management Reforms to the National Academy of Public Administration Secretary Moniz to Present Project Management Reforms to the National Academy of Public Administration January 12, 2015 - 10:30am Addthis News Media Contact 202-586-4940 Secretary Moniz to Present Project Management Reforms to the National Academy of Public Administration WASHINGTON- On Thursday, January 15, Energy Secretary Ernest Moniz will give a

  11. FY 2013 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    Metrics and Targets | Department of Energy 3 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2013 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2013, first quarter through fourth quarter. PDF icon FY 2013 1st Quarter Metrics PDF icon FY 2013 2nd Quarter Metrics PDF icon FY 2013 3rd Quarter Metrics PDF icon FY 2013 4th Quarter Metrics More

  12. FY 2014 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    Metrics and Targets | Department of Energy 4 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2014 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2014, first quarter through fourth quarter. PDF icon FY 2014 1st Quarter Metrics PDF icon FY 2014 2nd Quarter Metrics PDF icon FY 2014 3rd Quarter Metrics PDF icon FY 2014 4th Quarter Metrics More

  13. FY 2015 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    Metrics and Targets | Department of Energy 5 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2015 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2015, first quarter through fourth quarter. PDF icon FY 2015 1st Quarter Metrics PDF icon FY 2015 2nd Quarter Metrics PDF icon FY 2015 3rd Quarter Metrics PDF icon FY 2015 4th Quarter Metrics More

  14. 2015 DOE Acquisition and Project Management (APM) Workshop | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5 DOE Acquisition and Project Management (APM) Workshop 2015 DOE Acquisition and Project Management (APM) Workshop Workshop Details: What: 2015 DOE Acquisition and Project Management (APM) Workshop When: March 24, 25, 26 2015 (Tue, Wed, Thu) Where: Sheraton Pentagon City Hotel, 900 South Orme Street, Arlington, VA 22204 (Lunch will not be included in this year's program) Who: DOE FPDs/Staff, Program/Staff Office Reps, and Contracting Officers supporting APM. (This year's combined

  15. Savannah River Site Contractor Receives Project Management Institute Award

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. The local chapter of the Project Management Institute (PMI) recently honored the Savannah River Site liquid waste contractor with its 2011 Project of the Year award.

  16. FY 2008 Overall Contract and Project Management Improvement Performanc...

    Broader source: Energy.gov (indexed) [DOE]

    Attachmentv02 2008-11-17.pdf More Documents & Publications FY 2009 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2010 Overall Contract...

  17. Contract and Project Management Improvement (CPMI) Closure Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Following the success of the CAP, the Deputy Secretary convened the DOE Contract and Project Management Summit in December 2010 to discuss strategies for additional improvement in ...

  18. PROJECT PROFILE: Advanced Thermal Management for Higher Module...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    modules, resulting in higher module power output and lower levelized cost of electricity (LCOE). ... of each advanced thermal management innovation investigated in this project. ...

  19. Ensuring Project Success - The Fundamental Art of Managing the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ensuring Project Success - The Fundamental Art of Managing the Interfaces August 2009 Presenter: Jeff Smith, Deputy for Operations, Oak Ridge National Laboratory Track 8-3 Topics ...

  20. Deputy Assistant Secretary for Acquisition and Project Management

    Office of Environmental Management (EM)

    and experts in project management to ensure issues are identified early and lessons learned are being applied in real-time; Selecting proper contract types; tying fee...

  1. Celebrating Successes of Environmental Management Recovery Act Projects

    Broader source: Energy.gov [DOE]

    The Office of Environmental Management marked a milestone at the end of last month as they completed 84 American Recovery and Reinvestment Act-funded projects across America.

  2. Federal Energy Management Program Recovery Act Project Stories

    Broader source: Energy.gov [DOE]

    Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

  3. Spent Nuclear Fuel project integrated safety management plan

    SciTech Connect (OSTI)

    Daschke, K.D.

    1996-09-17

    This document is being revised in its entirety and the document title is being revised to ``Spent Nuclear Fuel Project Integrated Safety Management Plan.

  4. Program and Project Management for the Acquisition of Capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3.3B, Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health Requirement,...

  5. New Draft Page Change - Program and Project Management for the...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Draft Page Change - Program and Project Management for the Acquisition of Capital Assets by Patricia Greeson The Page Change is a limited update to incorporate recent Secretarial...

  6. Project Management Development Company PMD | Open Energy Information

    Open Energy Info (EERE)

    Development Company PMD Jump to: navigation, search Name: Project Management & Development Company (PMD) Place: Jubail Industrial City, Saudi Arabia Zip: 31961 Product: Saudi-based...

  7. DOE Acquisition and Project Management (APM) Glossary of Terms Handbook

    Office of Environmental Management (EM)

    FINAL VERSION 9-30-2014 | Department of Energy DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014 DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014 This handbook provides definitions of acquisition and project management terms commonly used in DOE projects to ensure consistent use of terms in DOE project documents and discussions. PDF icon DOE APM Glossary of Terms Handbook_FINAL_Sep_30_2014.pdf More

  8. Manager Helps Washington County Develop Energy Efficiency Projects |

    Office of Environmental Management (EM)

    Department of Energy Manager Helps Washington County Develop Energy Efficiency Projects Manager Helps Washington County Develop Energy Efficiency Projects August 11, 2010 - 1:01pm Addthis An Energy Department grant funded Autumn Salamack's new job as resource conservation manager for Kitsap County, Washington, and the energy efficient windows framed behind her. | Photo courtesy of Kitsap County, WA | An Energy Department grant funded Autumn Salamack's new job as resource conservation manager

  9. Invitation to the 2012 DOE Project Management Workshop | Department of

    Office of Environmental Management (EM)

    Energy Invitation to the 2012 DOE Project Management Workshop Invitation to the 2012 DOE Project Management Workshop PDF icon Kolb Signed.pdf More Documents & Publications FY2012 Excess Elimination Report United States and France Sign Joint Statement on Civil Liability for Nuclear Damage MA-2009-000093Signed.pdf

  10. Surface Environmental Surveillance Project: Locations Manual Volume 1 Air and Water Volume 2 Farm Products, Soil & Vegetation, and Wildlife

    SciTech Connect (OSTI)

    Fritz, Brad G.; Patton, Gregory W.; Stegen, Amanda; Poston, Ted M.

    2009-01-01

    This report describes all environmental monitoring locations associated with the Surface Environmental Surveillance Project. Environmental surveillance of the Hanford site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The environmental surveillance sampling design is described in the Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operation Office (DOE/RL-91-50). This document contains the locations of sites used to collect samples for the Surface Environmental Surveillance Project (SESP). Each section includes directions, maps, and pictures of the locations. A general knowledge of roads and highways on and around the Hanford Site is necessary to successfully use this manual. Supplemental information (Maps, Gazetteer, etc.) may be necessary if user is unfamiliar with local routes. The SESP is a multimedia environmental surveillance effort to measure the concentrations of radionuclides and chemicals in environmental media to demonstrate compliance with applicable environmental quality standards and public exposure limits, and assessing environmental impacts. Project personnel annually collect selected samples of ambient air, surface water, agricultural products, fish, wildlife, and sediments. Soil and vegetation samples are collected approximately every 5 years. Analytical capabilities include the measurement of radionuclides at very low environmental concentrations and, in selected media, nonradiological chemicals including metals, anions, volatile organic compounds, and total organic carbon.

  11. DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental...

  12. Quality Assurance Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-27

    This Guide provides information to assist U.S. Department of Energy (DOE) Federal Project Directors (FPD) and their Integrated Project Teams (IPT) in carrying out their Quality Assurance (QA)-related roles and responsibilities.

  13. Secretarial Memorandum on Integrating Project Management with NEPA

    Energy Savers [EERE]

    Compliance to Improve Decision Making | Department of Energy Secretarial Memorandum on Integrating Project Management with NEPA Compliance to Improve Decision Making Secretarial Memorandum on Integrating Project Management with NEPA Compliance to Improve Decision Making June 12, 2012 - 4:14pm Addthis Declaring that "Compliance with [NEPA] is a pre-requisite to successful implementation of DOE programs and projects," the Secretary has signed a memorandum on "Improved Decision

  14. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policies and Procedures Policies and Procedures Fermi Project Management EVMS Policy/Procedures EVMS Certified System Documents OPSS Guidance # Description Desktop Instructions Policy FRA Earned Value Management Description EVMS Certification Letter EVM Processes Using Flow Diagrams and Visuals 12.PM-001 Project WBS, OBS, RAM 12.PM-002 Control Accounts, Work Packages, Planning Packages 12.PM-002.DT-02 - Sale of Special Process Spares 12.PM-003 Work Authorization 12.PM-004 Project Scheduling

  15. Federal Energy Management Program Recovery Act Project Stories | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Project Stories Federal Energy Management Program Recovery Act Project Stories Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies. U.S. Pacific Command The U.S. Department of Defense (DOD) U.S. Pacific Command (USPACOM) collaborated with FEMP and six DOE national laboratories to solve some of USPACOM's most pressing energy needs. The USPACOM energy

  16. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    doe logo Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: Wednesday, June 29, 2011 IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER Idaho Falls, ID � The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Cooper has more than 30 years of experience in commercial and

  17. OAR 635-100 - Wildlife Diversity Plans | Open Energy Information

    Open Energy Info (EERE)

    for Wildlife Diversity Plans used to guide the State of Oregon's Department of Fish and Wildlife when managing non-game wildlife. Published NA Year Signed or Took Effect...

  18. DOE Financial Assistance Awards: Active Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Source: US DOE 712013 eere.energy.gov DOE Financial Assistance Awards: Active Project ... eere.energy.gov Award Mechanisms * Financial Assistance - Principal Purpose: to ...

  19. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-29

    The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool.

  20. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    SciTech Connect (OSTI)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  1. Federal Staffing Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-03

    This Guide provides an approach to determining the appropriate level and type of federal personnel needed to effectively plan, direct, and oversee project execution. Superseded by DOE G 413.3-19 Admin Chg 1.

  2. Quality Assurance Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-27

    This Guide provides acceptable approaches for implementing the Quality Assurance requirements and criteria of DOE O 413.3A related to the development and implementation of a Quality Assurance Program for the project. No cancellations.

  3. Fermilab | Directorate | Office of Project Management Oversight...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Projects, Dec 7, 2009 DOE Presentations External Independent Reviews, 11.14.2006 by Catherine Santana Dan Lehman Briefing on DOE O 413.3B, 02.23.2011 Last modified: 08262015...

  4. Environmental Management Completed Projects 2005-Present

    Broader source: Energy.gov [DOE]

    This document provides the list of completed EM cleanup projects from various sites across the country from 2005 to present, along with the each project’s performance related to cost, schedule, and...

  5. Information Technology Program/Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-01-20

    To close this policy gap the Office of the CIO (OCIO) proposes to develop a new order with departmental guidance on essential processes, documentation, and critical decision-points for IT projects.

  6. West Valley Demonstration Project Transportation Emergency Management Program

    Office of Environmental Management (EM)

    West Valley Demonstration Project Transportation Emergency Management Program Independent Oversight Review of the Office of Independent Oversight and Performance Assurance September 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS .........................................................................................

  7. Program and Project Management for the Acquisition of Capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    13.B, Chg 1 (PgChg), Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health...

  8. Program and Project Management for the Acquisition of Capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARCHIVED DOE O 413.3A Chg 1, Program and Project Management for the Acquisition of Capital Assets by John Makepeace Functional areas: Acquisition, Defense Nuclear Facility Safety...

  9. EM Focuses on Contract, Project Management Improvements in Three...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... In other presentations, James Moore with the U.S. Army Corps of Engineers (USACE), advisor to EM for the Project Management Partnership, presented the mission of USACE and how the ...

  10. Safeguards and Security for Program and Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-11-15

    This Guide provides approaches for implementing security provisions within the functional areas contained in DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets. Canceled by DOE G 413.3-3A.

  11. Project Management Policy & Guidance Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy & Guidance Documents Project Management Policy & Guidance Documents << Return to Directives & Documents | Proceed to Publications & Documents >> Document Type Function

  12. Project Management Publications & Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications & Documents Project Management Publications & Documents << Return to Directives & Documents | Proceed to Policy & Guidance >> Filter by Source Filter by Topic

  13. Project Management Plan Examples 1 - 80 | Department of Energy

    Office of Environmental Management (EM)

    Examples 1 - 80 Project Management Plan Examples 1 - 80 The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The descriptions below should be used to navigate to the subject of interest. Policy & Operational Decisions, Assumptions and Strategies - Examples 1 & 2 - Includes organizational responsibilities and structure, disposition path, future use of facility, S&S Reqs and plan, hazard elimination or

  14. PROJECT PROFILE: Advanced Thermal Management for Higher Module Power Output

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Advanced Thermal Management for Higher Module Power Output PROJECT PROFILE: Advanced Thermal Management for Higher Module Power Output Funding Opportunity: SuNLaMP SunShot Subprogram: Photovoltaics Location: Sandia National Laboratories, Albuquerque, NM Amount Awarded: $2,816,911 Higher temperatures of photovoltaic (PV) modules are causing lower than projected module performance. For example, a free-standing Si PV module has 0.4% decrease in efficiency per degree

  15. Project Management Institute Highlights Savannah River Nuclear Solutions in

    Energy Savers [EERE]

    Publication | Department of Energy Project Management Institute Highlights Savannah River Nuclear Solutions in Publication Project Management Institute Highlights Savannah River Nuclear Solutions in Publication February 6, 2014 - 12:00pm Addthis American Recovery and Reinvestment Act workers at the Savannah River Site imploded the 455-foot-tall K Reactor Cooling Tower in May 2010. American Recovery and Reinvestment Act workers at the Savannah River Site imploded the 455-foot-tall K Reactor

  16. Best-in-Class Project Management Initiative Corporate Implementation Plan

    Energy Savers [EERE]

    Best-in-Class Project Management Initiative Corporate Implementation Plan Final Prepared for: U.S. Department of Energy Prepared by: U.S. Army Corps of Engineers, Huntington District and Project Time & Cost, Inc. 2727 Paces Ferry Road, Suite 1-1200 Atlanta, Georgia 30339 March 14, 2008 TOC - 1 Table of Contents Executive Summary ............................................................................................................. i 1.0

  17. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    SciTech Connect (OSTI)

    Gelles, C. M.; Sheppard, F. R.

    2002-02-26

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

  18. EM Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM officials wrote a chapter of a recently published book, Managing Nuclear Projects – A Comprehensive Management Resource, which covers a range of areas with emphasis on process, requirements and lessons learned. Authors from France, Germany, Argentina, Belgium, Finland, Austria, and the U.S. contributed to the book.

  19. CRAD, Management- Oak Ridge National Laboratory TRU ALPHA LLWT Project

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a November 2003 assessment of the Management Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory TRU ALPHA LLWT Project.

  20. NNSA Receives Secretary's Award for Project Management Excellence |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration Receives Secretary's Award for Project Management Excellence | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets

  1. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Broader source: Energy.gov [DOE]

    Idaho Falls, ID The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOEs Idaho site.

  2. CRAD, Management- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Management at the Idaho Accelerated Retrieval Project Phase II.

  3. CRAD, Emergency Management- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Emergency Management program at the Idaho Accelerated Retrieval Project Phase II.

  4. NA APM - Associate Administrator for Acquisition & Project Management |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration APM - Associate Administrator for Acquisition & Project Management | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact

  5. Management and Development of the Western Resources Project

    SciTech Connect (OSTI)

    Terry Brown

    2009-03-09

    The purpose of this project was to manage the Western Resources Project, which included a comprehensive, basin-wide set of experiments investigating the impacts of coal bed methane (CBM; a.k.a. coal bed natural gas, CBNG) production on surface and groundwater in the Powder River Basin in Wyoming. This project included a number of participants including Apache Corporation, Conoco Phillips, Marathon, the Ucross Foundation, Stanford University, the University of Wyoming, Montana Bureau of Mines and Geology, and Western Research Institute.

  6. Acquisition and Project Management | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA

  7. Office of Acquisition and Project Management

    Energy Savers [EERE]

    /2012 1 Fifty years of nuclear weapons production and energy research generated millions of gallons of liquid radioactive waste, millions of cubic meters of solid radioactive wastes, thousands of tons of spent nuclear fuel and special nuclear material, along with huge quantities of contaminated soil and water. The Environmental Management (EM) program was established in 1989 to achieve the successful cleanup of this Cold War legacy. In order to execute its mission, EM has ranked, in priority

  8. Protecting Wildlife

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protecting Wildlife Protecting Wildlife We monitor and protect the wildlife and their habitats on Laboratory property. February 2, 2015 Mule deer on LANL property LANL has been home to mule deer since its creation in 1942 and has seasonally been home to elk since their reintroduction to New Mexico in the 1960s. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Protecting our wildlife Since the early 1940s, LANL's

  9. Report: Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management

    Energy Savers [EERE]

    U.S. Department of Energy REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management Submitted by the EMAB Acquisition and Project Management Subcommittee December 5, 2011 Introduction: This report provides a comprehensive summary of the work performed by the Acquisition and Project Management Subcommittee (APMS) of the

  10. Various Project Management Reports | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Various Project Management Reports Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Department of Energy Office of Science Various Project Management Reports Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown

  11. Project Managers Guide to Managing Impact and Process Evaluation Studies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manager's Guide to Managing Impact and Process Evaluation Studies Prepared for: Office of Energy Efficiency and Renewable Energy (EERE) Department of Energy Prepared by: Yaw O. Agyeman, Lawrence Berkeley Laboratory & Harley Barnes, Lockheed Martin August 2015 Acknowledgments This "Project Manager's Guide to Managing Impact and Process Evaluation Studies," was completed for the U.S. Department of Energy (DOE) by Lawrence Berkeley National Laboratories (LBNL), Berkeley, California,

  12. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-13

    To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System; and Attachment 2, Contractor Requirements Document paragraph 1d regarding a project management system. Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3A.

  13. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-13

    To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. (Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System); and Attachment 2, Contractor Requirements Document (paragraph 1d regarding a project management system). Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3 Chg 1.

  14. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-18

    To provide the Department of Energy (DOE), including the National Nuclear Security Administration, with project management direction for the acquisition of capital assets with the goal of delivering projects on schedule, within budget, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health standards. Cancels DOE O 413.3. Canceled by DOE O 413.3A Chg 1.

  15. FY 2008 Overall Contract and Project Management Improvement Performance Metrics and Targets

    Broader source: Energy.gov [DOE]

    FY 2008 4th Quarter Metrics Final -- Overall Contract and Project Management Performance Metrics and Targets.

  16. EIS-0337: West Valley Demonstration Project Waste Management

    Broader source: Energy.gov [DOE]

    The purpose of the Final West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy’s proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities.

  17. Program & Project Management For The Acquisition Of Capital Assets |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy PDF icon Program &amp; Project Management For The Acquisition Of Capital Assets More Documents & Publications "Paper" Energy Systems Acquisition Advisory Board Process ESAAB Standard Operating Procedure - July 2014 Microsoft PowerPoint - 01 Bosco PM Workshop BOSCO Feb22_2010PB final rcvd 5 Mar [Compatibility Mode]

  18. Federal Energy Management Program Recovery Act Technical Assistance Projects

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) issued a Call for Technical Services in May 2010 to help federal agencies identify and prioritize energy efficiency, water efficiency, and renewable energy projects. Read information about the Call for Technical Services (including technical service opportunities, application process, selection criteria, reporting requirements, and contacts).

  19. 2016 DOE Project Management Workshop - Area Restaurants | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Area Restaurants 2016 DOE Project Management Workshop - Area Restaurants Information on surrounding area restaurants PDF icon Area restaurants More Documents & Publications 2015 APM Workshop - Surrounding Area Restaurants Surrond Area Resturants Directory of Potential Stakeholders for DOE Actions under NEPA

  20. 2016 DOE Project Management Workshop - Hotel Dining | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Hotel Dining 2016 DOE Project Management Workshop - Hotel Dining Menu for Sheraton's hotel restaurant, Potomac Restaurant and Lounge PDF icon Menu More Documents & Publications Sheraton Restaurant Menu 2015 APM Workshop - Sheraton Restaurant Menu_Potomac Antje Wittenberg, Directorate General for Enterprise and Industry, The EU Raw Materials Initiative and the Report of the Ad-hoc Group

  1. 2016 DOE Project Management Workshop - Transportation | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Transportation 2016 DOE Project Management Workshop - Transportation Complimentary guest shuttle service provided by Sheraton Pentagon City Hotel. PDF icon Shuttle service More Documents & Publications 2015 APM Workshop - Sheraton Pentagon Shuttle Fact Sheet Shuttle Schedule Alexandria Hilton Shuttle Schedule

  2. Environmental Report Project Informs Paducah Community, Educates Students |

    Energy Savers [EERE]

    Department of Energy Report Project Informs Paducah Community, Educates Students Environmental Report Project Informs Paducah Community, Educates Students January 28, 2015 - 12:00pm Addthis Students examine different species found in the West Kentucky Wildlife Management Area. Students examine different species found in the West Kentucky Wildlife Management Area. Students watch as water samples are taken to be used to measure water quality. Students watch as water samples are taken to be

  3. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect (OSTI)

    Field, S. M.

    2007-04-01

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  4. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.

  5. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, Quality Assurance Requirements, ANSI/ASQC E4-2004, Quality Systems for Environmental Data and Technology Programs Requirements with Guidance for Use, and ISO 14001-2004, Environmental Management Systems, have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, Quality Assurance Program, identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, QA Program Implementation, identifies the TAC organizations that have responsibility for implementing the QA program requirements; and Appendix C of the QA Manual provides comparison tables that identify where the requirements of other standards are addressed in the QA Manual.

  6. U.S. Fish and Wildlife Service Moves toward Net-Zero Buildings (Fact Sheet), Federal Energy Management Program (FEMP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    refuge showcases wetland areas and forests that are home to a myriad of migra- tory birds and other wildlife. The design team's vision became a reality when the new visitor's center opened its doors in 2010. The 5,879-square foot building provides a starting point for visi- tors to to learn about the wildlife on the refuge. The facility also houses hands-on exhibits, office and classroom space, and a nature-themed store. "The design of this visitor center exemplifies the U.S. Fish and

  7. West Valley Demonstration Project High-Level Waste Management

    Office of Environmental Management (EM)

    DRAFT_19507_1 High-Level Waste Management Bryan Bower, DOE Director - WVDP DOE High-Level Waste Corporate Board Meeting Savannah River Site April 1, 2008 West Valley Demonstration Project West Valley Demonstration Project DRAFT_19507_2 West Valley High-Level Waste To solidify the radioactive material from approximately 600,000 gallons of high-level radioactive waste into a durable, high-quality glass, both a pretreatment system to remove salts and sulfates from the waste and a vitrification

  8. 2008 Project Management Awards | U.S. DOE Office of Science ...

    Office of Science (SC) Website

    Presented at the 2009 Department of Energy Project Management Workshop SECRETARY'S AWARD ... Insert photo credit here... Left to Right: Secretary Chu, Daniel Green (CMS Project ...

  9. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-07-28

    The Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental safety and health standards. The page change incorporates requirements of DOE-STD-1189-2008, Integration of Safety into the Design Process, mandatory for Hazard Category 1, 2 and 3 nuclear facilities. Cancels DOE O 413.3. Canceled by DOE O 413.3B dated 11-29-10.

  10. FY 2010 Overall Contract and Project Management Improvement Performance Metrics and Targets

    Broader source: Energy.gov [DOE]

    Overall Contract and Project Management Performance Metrics and Targets for FY 2010, first quarter through fourth quarter.

  11. FY 2009 Overall Contract and Project Management Improvement Performance Metrics and Targets

    Broader source: Energy.gov [DOE]

    Overall Contract and Project Management Performance Metrics and Targets for FY 2009, first quarter through fourth quarter.

  12. FY 2012 Overall Contract and Project Management Improvement Performance Metrics and Targets

    Broader source: Energy.gov [DOE]

    Overall Contract and Project Management Performance Metrics and Targets for FY 2012, first quarter through fourth quarter.

  13. FY 2011 Overall Contract and Project Management Improvement Performance Metrics and Targets

    Broader source: Energy.gov [DOE]

    Overall Contract and Project Management Performance Metrics and Targets for FY 2011, first quarter through fourth quarter.

  14. U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT U.S. DEPARTMENT OF ENERGY CONTRACT AND PROJECT MANAGEMENT PDF icon U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT More Documents & Publications External Independent Review (EIR) Standard Operating Procedure (SOP) September 2010 External Independent Review (EIR) Standard Operating Procedure (SOP) Septemebr 2010 External Independent Review (EIR) Standard

  15. Microsoft Word - IT_Project_Management_Profile_1 9 2008.doc

    Energy Savers [EERE]

    Please note the training requirements will be updated based on new requirements for project managers to comply with FAC P/PM (Federal Acquisition Certification for Program and Project Managers) requirements. Revised 10/18/2007 Information Technology (IT) Project Manager (PM) Profile *Must be completed *Name: _____________________________________ *Tel No: __________________*Title: _________________ *Fed/Contractor: ____________ *Program Office: ___________*Email:

  16. Analysis and Mapping of Vegetation and Habitat for the Sheldon National Wildlife Refuge

    SciTech Connect (OSTI)

    Tagestad, Jerry D.

    2010-06-01

    The Lakeview, Oregon, office of the U.S. Fish and Wildlife Service (USFWS) contracted Pacific Northwest National Laboratory to classify vegetation communities on Sheldon National Wildlife Refuge in northeastern Nevada. The objective of the mapping project was to provide USFWS refuge biologists and planners with detailed vegetation and habitat information that can be referenced to make better decisions regarding wildlife resources, fuels and fire risk, and land management. This letter report describes the datasets and methods used to develop vegetation cover type and shrub canopy cover maps for the Sheldon National Wildlife Refuge. The two map products described in this report are (1) a vegetation cover classification that provides updated information on the vegetation associations occurring on the refuge and (2) a map of shrub canopy cover based on high-resolution images and field data.

  17. Information flow in the DAMA Project beyond database managers: Information flow managers

    SciTech Connect (OSTI)

    Russell, L.; Wolfson, O.; Yu, C.

    1996-03-01

    To meet the demands of commercial data traffic on the information highway, a new look at managing data is necessary. One projected activity, sharing of point-of-sale information, is being considered in the Demand Activated Manufacturing Project of the American Textile Partnership project. A scenario is examined in which 100,000 retail outlets communicate over a period of days. They provide the latest estimate of demand for sewn products across a chain of 26,000 suppliers through the use of bill-of-materials explosions at four levels of detail. A new paradign the information flow manager, is developed to handle this situation, including the case where members of the supply chain fail to communicate and go out of business. Techniques for approximation are introduced to keep estimates of demand as current as possible.

  18. Project plan, Hazardous Materials Management and Emergency Response Training Center: Project 95L-EWT-100

    SciTech Connect (OSTI)

    Borgeson, M.E.

    1994-11-09

    The Hazardous Materials Management and Emergency Response (HAMMER) Training Center will provide for classroom lectures and hands-on practical training in realistic situations for workers and emergency responders who are tasked with handling and cleanup of toxic substances. The primary objective of the HAMMER project is to provide hands-on training and classroom facilities for hazardous material workers and emergency responders. This project will also contribute towards complying with the planning and training provisions of recent legislation. In March 1989 Title 29 Code of Federal Regulations Occupational Safety and Health Administration 1910 Rules and National Fire Protection Association Standard 472 defined professional requirements for responders to hazardous materials incidents. Two general types of training are addressed for hazardous materials: training for hazardous waste site workers and managers, and training for emergency response organizations.

  19. Belgium east loop active network management (Smart Grid Project...

    Open Energy Info (EERE)

    Cancel Submit Categories: Smart Grid Projects Smart Grid Projects in Europe Smart Grid Projects - Grid Automation Distribution Smart Grid Projects - Grid Automation Transmission...

  20. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect (OSTI)

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  1. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect (OSTI)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  2. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect (OSTI)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  3. Scotch Creek Wildlife Area 2007-2008 Annual Report.

    SciTech Connect (OSTI)

    Olson, Jim

    2008-11-03

    The Scotch Creek Wildlife Area is a complex of 6 separate management units located in Okanogan County in North-central Washington State. The project is located within the Columbia Cascade Province (Okanogan sub-basin) and partially addresses adverse impacts caused by the construction of Chief Joseph and Grand Coulee hydroelectric dams. With the acquisition of the Eder unit in 2007, the total size of the wildlife area is now 19,860 acres. The Scotch Creek Wildlife Area was approved as a wildlife mitigation project in 1996 and habitat enhancement efforts to meet mitigation objectives have been underway since the spring of 1997 on Scotch Creek. Continuing efforts to monitor the threatened Sharp-tailed grouse population on the Scotch Creek unit are encouraging. The past two spring seasons were unseasonably cold and wet, a dangerous time for the young of the year. This past spring, Scotch Creek had a cold snap with snow on June 10th, a critical period for young chicks just hatched. Still, adult numbers on the leks have remained stable the past two years. Maintenance of BPA funded enhancements is necessary to protect and enhance shrub-steppe and to recover and sustain populations of Sharp-tailed grouse and other obligate species.

  4. U.S. DEPARTMENT OF ENERGY Project Shoal Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final

    Office of Legacy Management (LM)

    Project Shoal Site Environmental Management End State Vision - January 2005 DOE/NV--955 U.S. DEPARTMENT OF ENERGY Project Shoal Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final Final - Project Shoal Site Environmental Management End State Vision - January 2005 Executive Summary The Environmental Management End State Vision is to be used as the primary tool for communicating the individual site end state to the involved parties (e.g., U.S. Department of Energy [DOE], regulators, public

  5. Environmental management compliance reengineering project, FY 1997 report

    SciTech Connect (OSTI)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  6. Project management plan for Project W-320, Tank 241-C-106 sluicing. Revision 2

    SciTech Connect (OSTI)

    Phillips, D.R.

    1994-07-01

    A major mission of the US Department of Energy (DOE) is the permanent disposal of Hanford Site defense wastes by utilizing safe, environmentally acceptable, and cost-effective disposal methods that meet applicable regulations. The Tank Waste Remediation System (TWRS) Program was established at the Hanford Site to manage and control activities specific to the remediation of safety watch list tanks, including high-heat-producing tanks, and for the ultimate characterization, retrieval, pretreatment, and disposal of the low- and high-level fractions of the tank waste. Project W-320, Tank 241-C-106 Sluicing, provides the methodology, equipment, utilities, and facilities necessary for retrieving the high-heat waste from single-shell tank (SST) 24-C-106. Project W-320 is a fiscal year (FY) 1993 expense-funded major project, and has a design life of 2 years. Retrieval of the waste in tank 241-C-106 will be accomplished through mobilization of the sludge into a pumpable slurry using past-practice sluicing. The waste is then transferred directly to a double-shell tank for interim storage, subsequent pretreatment, and eventual disposal. A detailed description of the management organization and responsibilities of all participants is presented in this document.

  7. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scientific and Facility Projects (DOE 413) Scientific and Facility Projects (DOE 413) Scientific and Facility Projects CMS Detector Upgrade CMS Detector Upgrade Phase 2 LBNE LBNF/DUNE Muon g-2 Mu2e PIP PIP II SBN SLI-UUP SuperCDMS Project Contacts Project Contacts for Scientific and DOE 413 Projects Completed & Past Projects Last modified: 01/2

  8. Industrial Program of Waste Management - Cigeo Project - 13033

    SciTech Connect (OSTI)

    Butez, Marc [Agence nationale pour la gestion des dechets radioactifs - Andra, 1-7, rue Jean Monnet 92298 Chatenay-Malabry (France)] [Agence nationale pour la gestion des dechets radioactifs - Andra, 1-7, rue Jean Monnet 92298 Chatenay-Malabry (France); Bartagnon, Olivier; Gagner, Laurent [AREVA NC Tour AREVA 1 place de la Coupole 92084 Paris La Defense (France)] [AREVA NC Tour AREVA 1 place de la Coupole 92084 Paris La Defense (France); Advocat, Thierry; Sacristan, Pablo [Commissariat a l'energie atomique et aux energies alternatives - CEA, CEA-SACLAY 91191 Gif sur Yvette Cedex (France)] [Commissariat a l'energie atomique et aux energies alternatives - CEA, CEA-SACLAY 91191 Gif sur Yvette Cedex (France); Beguin, Stephane [Electricite de France - EDF, Division Combustible Nucleaire, 1, Place Pleyel Site Cap Ampere93282 Saint Denis (France)] [Electricite de France - EDF, Division Combustible Nucleaire, 1, Place Pleyel Site Cap Ampere93282 Saint Denis (France)

    2013-07-01

    The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

  9. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    SciTech Connect (OSTI)

    Jacobsen, P.H.

    1997-09-23

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

  10. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    SciTech Connect (OSTI)

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  11. Solid waste information and tracking system server conversion project management plan

    SciTech Connect (OSTI)

    MAY, D.L.

    1999-04-12

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  12. Management of water extracted from carbon sequestration projects

    SciTech Connect (OSTI)

    Harto, C. B.; Veil, J. A.

    2011-03-11

    Throughout the past decade, frequent discussions and debates have centered on the geological sequestration of carbon dioxide (CO{sub 2}). For sequestration to have a reasonably positive impact on atmospheric carbon levels, the anticipated volume of CO{sub 2} that would need to be injected is very large (many millions of tons per year). Many stakeholders have expressed concern about elevated formation pressure following the extended injection of CO{sub 2}. The injected CO{sub 2} plume could potentially extend for many kilometers from the injection well. If not properly managed and monitored, the increased formation pressure could stimulate new fractures or enlarge existing natural cracks or faults, so the CO{sub 2} or the brine pushed ahead of the plume could migrate vertically. One possible tool for management of formation pressure would be to extract water already residing in the formation where CO{sub 2} is being stored. The concept is that by removing water from the receiving formations (referred to as 'extracted water' to distinguish it from 'oil and gas produced water'), the pressure gradients caused by injection could be reduced, and additional pore space could be freed up to sequester CO{sub 2}. Such water extraction would occur away from the CO{sub 2} plume to avoid extracting a portion of the sequestered CO{sub 2} along with the formation water. While water extraction would not be a mandatory component of large-scale carbon storage programs, it could provide many benefits, such as reduction of pressure, increased space for CO{sub 2} storage, and potentially, 'plume steering.' Argonne National Laboratory is developing information for the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) to evaluate management of extracted water. If water is extracted from geological formations designated to receive injected CO{sub 2} for sequestration, the project operator will need to identify methods for managing very large volumes of water most of which will contain large quantities of salt and other dissolved minerals. Produced water from oil and gas production also typically contains large quantities of dissolved solids. Therefore, many of the same practices that are established and used for managing produced water also may be applicable for extracted water. This report describes the probable composition of the extracted water that is removed from the formations, options for managing the extracted water, the pros and cons of those options, and some opportunities for beneficial use of the water. Following the introductory material in Chapter 1, the report is divided into chapters covering the following topics: (Chapter 2) examines the formations that are likely candidates for CO{sub 2} sequestration and provides a general evaluation of the geochemical characteristics of the formations; (Chapter 3) makes some preliminary estimates of the volume of water that could be extracted; (Chapter 4) provides a qualitative review of many potential technologies and practices for managing extracted water and for each technology or management practice, pros and cons are provided; (Chapter 5) explores the potential costs of water management; and (Chapter 6) presents the conclusions.

  13. Project Management Plan for the Hawaii Geothermal Project Environmental Impact Statement

    SciTech Connect (OSTI)

    Reed, R.M.; Saulsbury, J.W.

    1993-06-01

    In 1990, Congress appropriated $5 million (Pu 101-514) for the State of Hawaii to use in Phase 3 of the Hawaii Geothermal Project (HGP). As defined by the State in its 1990 proposal to Congress, the HGP would consist of four phases: (1) exploration and testing of the geothermal resource associated with the Kilauea Volcano on the Island of Hawaii (the Big Island), (2) demonstration of deep-water power transmission cable technology in the Alenuihaha Channel between the Big Island and Maui, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands (DBED 1990). Because it considered Phase 3 to be research and not project development or construction, Congress indicated that allocation of this funding would not be considered a major federal action under NEPA and would not require an EIS. However, because the project is highly visible, somewhat controversial, and involves a particularly sensitive environment in Hawaii, Congress directed in 1991 (House Resolution 1281) that ''...the Secretary of Energy shall use such sums as are necessary from amounts previously provided to the State of Hawaii for geothermal resource verification and characterization to conduct the necessary environmental assessments and/or environmental impact statement (EIS) for the geothermal initiative to proceed''. In addition, the U.S. District Court of Hawaii (Civil No. 90-00407, June 25, 1991) ruled that the federal government must prepare an EIS for Phases 3 and 4 before any further disbursement of funds was made to the State for the HGP. This Project Management Plan (PMP) briefly summarizes the background information on the HGP and describes the project management structure, work breakdown structure, baseline budget and schedule, and reporting procedures that have been established for the project. The PMP does not address in detail the work that has been completed during the scoping process and preparation of the IP. The PMP has been developed to address the tasks required in preparing the Draft Environmental Impact Statement (DEIS), the public comment period, and the Final Environmental Impact Statement (FEIS).

  14. Innovative Study Helps Offshore Wind Developers Protect Wildlife |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Study Helps Offshore Wind Developers Protect Wildlife Innovative Study Helps Offshore Wind Developers Protect Wildlife October 27, 2015 - 9:33am Addthis Innovative Study Helps Offshore Wind Developers Protect Wildlife Jocelyn Brown-Saracino Jocelyn Brown-Saracino Environmental Research Manager, Wind and Water Power Technologies Office Thanks to a first-of-its-kind in-depth study of wildlife distribution and movements, the nation's Eastern Seaboard is better prepared than

  15. Microsoft PowerPoint - 05 Okonski final Project Management Workshop Slides

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    O'Konski | Department of Energy 5 Okonski final Project Management Workshop Slides O'Konski Microsoft PowerPoint - 05 Okonski final Project Management Workshop Slides O'Konski PDF icon Microsoft PowerPoint - 05 Okonski final Project Management Workshop Slides O'Konski More Documents & Publications OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy and Economic Performance Microsoft Word - Issue FY2010 Q1 Draft 20091228.doc Microsoft PowerPoint - 08 Lawrence

  16. Fernald Environmental Management Project Director's Final Findings and Orders, October 4, 1995

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fernald Environmental Management Project Director's Final Findings and Orders, Octobe.. Page 1 of 17 EM Home | Regulatory Compliance | Environmental Compliance Agreements Fernald Environmental Management Project Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Fernald Environmental Management Project : Findings and Orders P.O. Box 389705 : Cincinnati, Ohio 45239 :

  17. EM Employees Engage in Interactive Workshop on Contract, Project Management Improvements

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. - EM employees from across the DOE complex met at the Contract and Project Management Workshop this past month to focus on continuous improvements in planning and execution of contracts and projects.

  18. P AUll u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AUll ) u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION Page I of3 RECIPIENT: Proton Energy Systems STATE: CT PROJECT TITLE: Validation of an Advanced...

  19. Systems Engineering Plan and project record Configuration Management Plan for the Mixed Waste Disposal Initiative

    SciTech Connect (OSTI)

    Bryan, W.E.; Oakley, L.B.

    1993-04-01

    This document summarizes the systems engineering assessment that was performed for the Mixed Waste Disposal Initiative (MWDI) Project to determine what types of documentation are required for the success of the project. The report also identifies the documents that will make up the MWDI Project Record and describes the Configuration Management Plan describes the responsibilities and process for making changes to project documentation.

  20. BPA celebrates protection of Lemhi River fish and wildlife habitat

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    celebrates-protection-of-Lemhi-River-fish-and-wildlife-habitat Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives...

  1. California Department of Fish and Wildlife: Federal Energy Regulatory...

    Open Energy Info (EERE)

    Fish and Wildlife: Federal Energy Regulatory Commission (FERC) Hydroelectric Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: California...

  2. EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

  3. DEPARTMENT OF FNERGY EERE PROJECT MANAGEMENT CENTER NFPA DI!TERJ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DEPARTMENT OF FNERGY EERE PROJECT MANAGEMENT CENTER NFPA DITERJ.fiNATION ... would be conducted at the Department of Applied Economics on the SI. Paul campus. ...

  4. Directors Advance EM Mission with Help from Rigorous Project Management Program

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Nearly 160 EM employees maintain certifications from a project management program that helps them achieve successful outcomes in the Cold War cleanup.

  5. Data Management Plan for The Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    Broader source: Energy.gov [DOE]

    The Data Management Plan describes how DOE will handle data submitted by recipients as deliverables under the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

  6. EERE PROJECT MANAGEMENT CENTER Nl!PA DFTFnIINATION RECIPIENT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE PROJECT MANAGEMENT CENTER NlPA DFTFnIINATION RECIPIENT: FDC Enterprises, Inc. ... manufacture forage harvesting and handling equipment in their normal course of business. ...

  7. Secretary Moniz's Remarks on Project Management Reform at the National Academy of Public Administration-- As Delivered

    Broader source: Energy.gov [DOE]

    Secretary Moniz's remarks, as delivered, on Project Management at the National Academy of Public Administration in Washington, DC on January 15, 2015.

  8. Final Report of the Mid-Atlantic Marine Wildlife Surveys, Modeling...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Management Scott Johnston U.S. Fish and Wildlife Service Brian Kinlan ... Division of Migratory Bird Management U.S. Fish & Wildlife Service Daniel Martin I.M. ...

  9. Safeguards and Security for Program and Project Management -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Management, Property Management, Safety and Security The Guide provides a methodology for implementing the safeguards and security requirements of DOE O 413.3B....

  10. PUREX/UO{sub 3} deactivation project management plan

    SciTech Connect (OSTI)

    Washenfelder, D.J.

    1993-12-01

    From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.

  11. u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DETERMINATION RECIPIENT: Biodiversity Research Institute Page 1 of3 STATE: ME PROJECT TITLE : Modeling wildlife densities and habitat across temporal and spatial scales on the mid-Atlantic continental shelf Funding Opportunity Announcement Number Procun'ment Instrument Number NEPA Control Number em Number DE-FOA-000041 4 DE-EEOOO5362 GFO-OOO5362-001 0 Ba~d on my review o'the infonnation concerning the proposed action, as NEPA Compliance Officer (authoriud under DOE Order 451.1A). I have made the

  12. Program & Project Management For The Acquisition Of Capital Assets

    Energy Savers [EERE]

    Office of Engineering and Construction Management Department of Energy Root Cause Analysis Corrective Action Plan ISSUE #3: Strengthen Risk Management November 4, 2009 Paul Bosco, PE, PMP, LEED-AP Director, Office of Engineering and Construction Management (OECM) U. S. Department of Energy Office of Management Office of Engineering and Construction Management 2 * Some Background - GAO High-Risk List - Root Cause Analysis and Corrective Action Plan - Issue Number THREE * Things We Have Done: Risk

  13. Division of Energy and Mineral Resources Management - Projects

    Office of Environmental Management (EM)

    BIA - - Division of Energy and Mineral Division of Energy and Mineral Resources Management Resources Management 1 1 Assistant Secretary Assistant Secretary - - Indian Affairs Indian Affairs Office of Indian Office of Indian Energy and Economic Energy and Economic Development Development Division of Energy and Division of Energy and Mineral Resources Mineral Resources Management Management BIA BIA - - Division of Energy and Mineral Division of Energy and Mineral Resources Management Resources

  14. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    SciTech Connect (OSTI)

    Not Available

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  15. Program Managers/Project Leaders, Applied Energy Programs, LANL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rajesh Pawar, Science Project Leader, 505-665-6929, rajesh@lanl.gov Energy Storage, Albert Migliori, Science Project Leader, 505-667-2515, migliori@lanl.gov Fuel Cells, Rod...

  16. Safeguards and Security for Program and Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-08-15

    This Guide addresses the implementation steps for achieving safeguards and security systems that support the Department's projection objectives.

  17. DOE - Office of Legacy Management -- West Valley Demonstration Project - NY

    Office of Legacy Management (LM)

    23 Valley Demonstration Project - NY 23 FUSRAP Considered Sites Site: West Valley Demonstration Project (NY.23) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.em.doe.gov/SiteInfo/westvalleydemoproject.aspx Documents Related to West Valley Demonstration Project

  18. Multifamily Retrofit Project Manager Job/Task Analysis and Report: September 2013

    SciTech Connect (OSTI)

    Owens, C. M.

    2013-09-01

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Retrofit Project Manager JTA identifies and catalogs all of the tasks performed by multifamily retrofit project managers, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  19. Follow-Up on the Management of the Plutonium Finishing Plant Project

    Office of Environmental Management (EM)

    on The Management of the Plutonium Finishing Plant Project OAS-M-14-11 September 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 September 18, 2014 MEMORANDUM FOR THE MANAGER, RICHLAND OPERATIONS OFFICE FROM: David Sedillo, Director Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Follow-Up on The Management of the Plutonium Finishing Plant Project" BACKGROUND

  20. Commercialization and Project Management PIA, Golden Field Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 ...

  1. Commercialization and Project Management PIA, Golden Field Office...

    Energy Savers [EERE]

    Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA,...

  2. Richland Environmental Restoration Project management action process document

    SciTech Connect (OSTI)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  3. Deputy Assistant Secretary for Acquisition and Project Management

    Office of Environmental Management (EM)

    of approximately 56 million gallons of radioactive waste stored in 177 underground storage tanks at the Hanford site. Physical construction on this project is approximately 62%...

  4. US DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DEI...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... in the vicinity of the proposed RITE Project: the threatened green turtle and loggerhead turtle and the endangered shortnose sturgeon, Kemp's ridley turtle, and leatherback turtle. ...

  5. The Wildlife Society 22nd Annual Conference

    Broader source: Energy.gov [DOE]

    The Wildlife Society’s 22nd Annual Conference will be held Oct. 17–21, 2015, in Winnipeg, Canada. Bioenergy Technologies Office (BETO) Sustainability Manager Kristen Johnson will be speaking on how partnerships with key stakeholders lead to the research, development, and demonstration of technologies that produce advanced bioenergy and bioproducts from lignocellulosic and algal biomass. Several activities supported by BETO provide insights into how habitat and wildlife can be considered when designing bioenergy systems. Strong public and private collaboration can help meet simultaneous goals of expanding the bioeconomy while also incorporating the needs of wildlife, reducing greenhouse gas emissions, and providing other environmental and socio-economic benefits.

  6. Program and Project Management for the Acquisition of Capital Assets (Informational Purposes Only)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-01-11

    The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool. The Page Change is a limited update to incorporate recent Secretarial policies and issues raised by external stakeholders.

  7. wildlife | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    wildlife | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home

  8. DOE - Office of Legacy Management -- Project Gnome Site - NM 12

    Office of Legacy Management (LM)

    Gnome Site - NM 12 FUSRAP Considered Sites Site: Project Gnome Site (NM.12) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gnome-Coach, New Mexico, Site Documents Related to Project Gnome Site Conditional Certificate of Completion. Attached letter from New Mexico Environment Department of DOE dated September 25, 2014. Fact Sheet

  9. A'All) u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    l A'All) u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:Hudson Valley Community CoUege; sub: Three Rivers Community College PROJECf TITLE:...

  10. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect (OSTI)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  11. Feb. 25 Webinar Will Focus on Managing and Implementing Energy Projects for

    Office of Environmental Management (EM)

    Community Economic Development | Department of Energy Feb. 25 Webinar Will Focus on Managing and Implementing Energy Projects for Community Economic Development Feb. 25 Webinar Will Focus on Managing and Implementing Energy Projects for Community Economic Development February 20, 2015 - 5:41pm Addthis The U.S. Department of Energy (DOE) Office of Indian Energy, in partnership with Western Area Power Administration (Western), will present the next Tribal Renewable Energy Series webinar,

  12. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  13. NREL’s Grid Integration Lab Nominated for Prestigious Project Management Award

    Broader source: Energy.gov [DOE]

    The new Energy Systems Integration Facility (ESIF) at the Energy Department’s National Renewable Energy Laboratory (NREL) received a nomination as one of three international finalists for the Project Management Institute (PMI) Project of the Year Award. Although the ESIF project team didn’t take home the top honor this year, we are proud of the accomplishments they made in bringing one of the most innovative new laboratories in the country from the drawing board to fruition.

  14. UMTRA Ground Water Project management action process document

    SciTech Connect (OSTI)

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards.

  15. ANG coal gasification project management control system report. [Great Plains project

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  16. Environmental management requirements/defensible costs project. Final report

    SciTech Connect (OSTI)

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  17. Report Wildlife Encounters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wildlife Encounters Report Wildlife Encounters Report any encounters with wildlife in the Los Alamos area. April 12, 2012 A mama black bear and her cub A mama black bear and her cub in Los Alamos. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email If you find an injured bird, contact the Santa Fe Raptor Center. Have a close encounter? Report the following Any wildlife incidents or encounters Migratory bird injury or

  18. The Human Genome Project: Information access, management, and regulation. Final report

    SciTech Connect (OSTI)

    McInerney, J.D.; Micikas, L.B.

    1996-08-31

    The Human Genome Project is a large, internationally coordinated effort in biological research directed at creating a detailed map of human DNA. This report describes the access of information, management, and regulation of the project. The project led to the development of an instructional module titled The Human Genome Project: Biology, Computers, and Privacy, designed for use in high school biology classes. The module consists of print materials and both Macintosh and Windows versions of related computer software-Appendix A contains a copy of the print materials and discs containing the two versions of the software.

  19. DOE - Office of Legacy Management -- Dayton Project Unit 6 - Scioto

    Office of Legacy Management (LM)

    Laboratory - OH 45A Unit 6 - Scioto Laboratory - OH 45A FUSRAP Considered Sites Site: Dayton Project (Unit 6) - Scioto Laboratory (OH.45A) No further action determination pending Designated Name: Not Designated Alternate Name: Scioto Laboratory Scioto Ordnance Plant Dayton Unit VI EPA Potential Release Site (PRS -325) OH.45A-1 OH.45A-2 OH.45A-3 OH.45A-4 Location: North of Harding Highway (Route 309) at County Route 98, Marion County, Marion, Ohio OH.45A-2 Evaluation Year: Circa 1987 Site

  20. Sustainable waste management in Africa through CDM projects

    SciTech Connect (OSTI)

    Couth, R.; Trois, C.

    2012-11-15

    Highlights: Black-Right-Pointing-Pointer This is a compendium on GHG reductions via improved waste strategies in Africa. Black-Right-Pointing-Pointer This note provides a strategic framework for Local Authorities in Africa. Black-Right-Pointing-Pointer Assists LAs to select Zero Waste scenarios and achieve sustained GHG reduction. - Abstract: Only few Clean Development Mechanism (CDM) projects (traditionally focussed on landfill gas combustion) have been registered in Africa if compared to similar developing countries. The waste hierarchy adopted by many African countries clearly shows that waste recycling and composting projects are generally the most sustainable. This paper undertakes a sustainability assessment for practical waste treatment and disposal scenarios for Africa and makes recommendations for consideration. The appraisal in this paper demonstrates that mechanical biological treatment of waste becomes more financially attractive if established through the CDM process. Waste will continue to be dumped in Africa with increasing greenhouse gas emissions produced, unless industrialised countries (Annex 1) fund carbon emission reduction schemes through a replacement to the Kyoto Protocol. Such a replacement should calculate all of the direct and indirect carbon emission savings and seek to promote public-private partnerships through a concerted support of the informal sector.

  1. Forestry herbicide influences on biodiversity and wildlife habitats in Southern forests.

    SciTech Connect (OSTI)

    Miller, Karl V.

    2004-01-01

    Abstract In the southern United States, herbicide use continues to increase for timber management in commercial pine (Pinus spp.) plantations, for modifying wildlife habitats, and for invasive plant control. Several studies have reported that single applications of forestry herbicides at stand initiation have minor and temporary impacts on plant communities and wildlife habitat conditions, with some reports of enhanced habitat conditions for both game and nongame species. Due to the high resiliency of floral communities, plant species richness and diversity rebound rapidly after single herbicide treatments, with short- and long-term compositional shifts according to the selectivity and efficacy of the herbicide used. Recently, however, a shift to the Southeast in North American timber supplies has resulted in increased forest management intensity. Current site-preparation techniques rely on herbicide combinations, often coupled with mechanical treatments and >1 years of post-planting applications to enhance the spectrum and duration of vegetation control. This near-total control of associated vegetation at establishment and more rapid pine canopy closure, coupled with shortened and repeated rotations, likely will affect plant diversity and wildlife habitat quality. Development of mitigation methods at the stand and landscape levels will be required to minimize vegetative and wildlife impacts while allowing continued improvement in pine productivity. More uncertain are long-term impacts of increasing invasive plant occupation and the projected increase in herbicide use that will be needed to reverse this worsening situation. In addition, the potential of herbicides to meet wildlife management objectives in areas where traditional techniques have high social costs (e.g., prescribed fire) should be fully explored.

  2. Forestry herbicide influences on biodiversity and wildlife habitat in Southern forests.

    SciTech Connect (OSTI)

    Miller, Karl V.; Miller, James, H.

    2004-07-01

    Abstract In the southern United States, herbicide use continues to increase for timber management in commercial pine (Pinus spp.) plantations, for modifying wildlife habitats, and for invasive plant control. Several studies have reported that single applications of forestry herbicides at stand initiation have minor and temporary impacts on plant communities and wildlife habitat conditions, with some reports of enhanced habitat conditions for both game and nongame species. Due to the high resiliency of floral communities, plant species richness and diversity rebound rapidly after single herbicide treatments, with short- and long-term compositional shifts according to the selectivity and efficacy of the herbicide used. Recently, however, a shift to the Southeast in North American timber supplies has resulted in increased forest management intensity. Current site-preparation techniques rely on herbicide combinations, often coupled with mechanical treatments and >1 years of post-planting applications to enhance the spectrum and duration of vegetation control. This near-total control of associated vegetation at establishment and more rapid pine canopy closure, coupled with shortened and repeated rotations, likely will affect plant diversity and wildlife habitat quality. Development of mitigation methods at the stand and landscape levels will be required to minimize vegetative and wildlife impacts while allowing continued improvement in pine productivity. More uncertain are long-term impacts of increasing invasive plant occupation and the projected increase in herbicide use that will be needed to reverse this worsening situation. In addition, the potential of herbicides to meet wildlife management objectives in areas where traditional techniques have high social costs (e.g., prescribed fire) should be fully explored.

  3. Policy Flash 2013-40 Acquisition Guide Chapter 43.3 Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimburstment Contracts

    Broader source: Energy.gov [DOE]

    Attached is Policy Flash 2013-40 Acquisition Guide Chapter 43.3 Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimbursement...

  4. Wind Wildlife Research Meeting X

    Broader source: Energy.gov [DOE]

    The biennial Wind Wildlife Research Meeting provides an internationally recognized forum for researchers and wind-wildlife stakeholders to hear contributed papers, view research posters, and listen...

  5. Project Schedules and Milestones Draft July 2014 Site Management Plan Page 1

    Office of Legacy Management (LM)

    Draft July 2014 Site Management Plan Page 1 5.0 Project Schedules and Milestones (FY 2015-FY 2017) 5.1 Establishing Project Schedules and Milestones As stated in Section 1.1.2, the Site Management Plan (SMP) establishes the overall plan for remedial actions at the Monticello Mill Tailings Site (MMTS) and milestones against which progress can be measured. The SMP also documents the overall plan for remedial actions at the Monticello Vicinity Properties site (MVP), which was deleted from the

  6. Project Schedules and Milestones Final August 2013 Site Management Plan Page 1

    Office of Legacy Management (LM)

    Final August 2013 Site Management Plan Page 1 5.0 Project Schedules and Milestones (FY 2014-FY 2016) 5.1 Establishing Project Schedules and Milestones As stated in Section 1.1.2, the Site Management Plan (SMP) establishes the overall plan for remedial actions at the Monticello Mill Tailings Site (MMTS) and milestones against which progress can be measured. The SMP also documents the overall plan for remedial actions at the Monticello Vicinity Properties site (MVP), which was deleted from the

  7. ARPA-E's 19 New Projects Focus on Battery Management and Storage |

    Energy Savers [EERE]

    Department of Energy E's 19 New Projects Focus on Battery Management and Storage ARPA-E's 19 New Projects Focus on Battery Management and Storage August 7, 2012 - 1:17pm Addthis Principal Deputy Director Eric Toone, former ARPA-E Director Arun Majumdar, the Honorable Bart Gordon and IBM Research Senior Director Kathleen Kingscott discuss the future of energy innovation at an ITIF event on August 2. | Energy Department photo. Principal Deputy Director Eric Toone, former ARPA-E Director Arun

  8. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-02-20

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  9. Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-10

    To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

  10. Improved Decision Making through the Integration of Program and Project Management with National Environmental Policy Act Compliance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-06-12

    Recommendations from the DOE Field Management Council (FMC), NEPA Improvement Team, and the Council on Environmental Quality (CEQ) for improving NEPA compliance through the integration of Program ad Project Management

  11. Fernald Environmental Management Project Director's Final Findings & Orders, December 27, 1994

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ohio Environmental Protection Agency 0.0. Box 163669,180O WaterMark Dr. dumbus, Ohio 43216-3669 '\ 644-3020 .X (614) 644-2329 December 27. 1994 Re: U.S. Department of Energy Fernald Environmental Management Project Attn: Jack Craig, Acting Site Manager P.O. Box 389705 Cincinnati, Ohio 45239 Fernald Environmental Restoration Management Corporation Attn: Don Ofte, President P.O. Box 538704 Cincinnati, Ohio 45253-8704 Dear Sirs: /---. ., ( 1 6454 c t f.. .: ,? I '; Lb.. i" _ &&

  12. Waste management project's alternatives: A risk-based multi-criteria assessment (RBMCA) approach

    SciTech Connect (OSTI)

    Karmperis, Athanasios C.; Sotirchos, Anastasios; Aravossis, Konstantinos; Tatsiopoulos, Ilias P.

    2012-01-15

    Highlights: Black-Right-Pointing-Pointer We examine the evaluation of a waste management project's alternatives. Black-Right-Pointing-Pointer We present a novel risk-based multi-criteria assessment (RBMCA) approach. Black-Right-Pointing-Pointer In the RBMCA the evaluation criteria are based on the quantitative risk analysis of the project's alternatives. Black-Right-Pointing-Pointer Correlation between the criteria weight values and the decision makers' risk preferences is examined. Black-Right-Pointing-Pointer Preference to the multi-criteria against the one-criterion evaluation process is discussed. - Abstract: This paper examines the evaluation of a waste management project's alternatives through a quantitative risk analysis. Cost benefit analysis is a widely used method, in which the investments are mainly assessed through the calculation of their evaluation indicators, namely benefit/cost (B/C) ratios, as well as the quantification of their financial, technical, environmental and social risks. Herein, a novel approach in the form of risk-based multi-criteria assessment (RBMCA) is introduced, which can be used by decision makers, in order to select the optimum alternative of a waste management project. Specifically, decision makers use multiple criteria, which are based on the cumulative probability distribution functions of the alternatives' B/C ratios. The RBMCA system is used for the evaluation of a waste incineration project's alternatives, where the correlation between the criteria weight values and the decision makers' risk preferences is analyzed and useful conclusions are discussed.

  13. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    SciTech Connect (OSTI)

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  14. Report Wildlife Encounters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Encounters Report any encounters with wildlife in the Los Alamos area. April 12, 2012 A mama black bear and her cub A mama black bear and her cub in Los Alamos. Contact...

  15. MANAGING UNCERTAINTIES ASSOCIATED WITH RADIOACTIVE WASTE DISPOSAL: TASK GROUP 4 OF THE IAEA PRISM PROJECT

    SciTech Connect (OSTI)

    Seitz, R.

    2011-03-02

    It is widely recognized that the results of safety assessment calculations provide an important contribution to the safety arguments for a disposal facility, but cannot in themselves adequately demonstrate the safety of the disposal system. The safety assessment and a broader range of arguments and activities need to be considered holistically to justify radioactive waste disposal at any particular site. Many programs are therefore moving towards the production of what has become known as a Safety Case, which includes all of the different activities that are conducted to demonstrate the safety of a disposal concept. Recognizing the growing interest in the concept of a Safety Case, the International Atomic Energy Agency (IAEA) is undertaking an intercomparison and harmonization project called PRISM (Practical Illustration and use of the Safety Case Concept in the Management of Near-surface Disposal). The PRISM project is organized into four Task Groups that address key aspects of the Safety Case concept: Task Group 1 - Understanding the Safety Case; Task Group 2 - Disposal facility design; Task Group 3 - Managing waste acceptance; and Task Group 4 - Managing uncertainty. This paper addresses the work of Task Group 4, which is investigating approaches for managing the uncertainties associated with near-surface disposal of radioactive waste and their consideration in the context of the Safety Case. Emphasis is placed on identifying a wide variety of approaches that can and have been used to manage different types of uncertainties, especially non-quantitative approaches that have not received as much attention in previous IAEA projects. This paper includes discussions of the current results of work on the task on managing uncertainty, including: the different circumstances being considered, the sources/types of uncertainties being addressed and some initial proposals for approaches that can be used to manage different types of uncertainties.

  16. Breaking Barriers Wildlife Refreshment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Barriers Wildlife Refreshment Walker becomes first black battalion commander. NSTec Aviation Safety Officer, RSL team honored by DOE. NNSS helping wildlife with new watering holes. See pages 8. See page 4. NSTec and UNLV Bring Technology Community Together at PDV Workshop In June 2014, National Security Technologies (NSTec) and University Nevada, Las Vegas (UNLV) co- hosted a Photon Doppler Velocimetry (PDV) Workshop at the UNLV Science and Engineering Building (SEB). More than 125 attendees

  17. Montana Fish, Wildlife & Parks | Open Energy Information

    Open Energy Info (EERE)

    Fish, Wildlife & Parks Jump to: navigation, search Logo: Montana Fish, Wildlife & Parks Name: Montana Fish, Wildlife & Parks Address: 1420 East 6th Ave, PO Box 200701 Place:...

  18. Fish and Wildlife Service | Open Energy Information

    Open Energy Info (EERE)

    Wildlife Service Jump to: navigation, search Logo: Fish and Wildlife Service Name: Fish and Wildlife Service Place: Washington, DC Year Founded: 1940 Phone Number: (303) 275-2370...

  19. Study on Evaluation of Project Management Data for Decommissioning of Uranium Refining and Conversion Plant - 12234

    SciTech Connect (OSTI)

    Usui, Hideo; Izumo, Sari; Tachibana, Mitsuo; Shibahara, Yuji; Morimoto, Yasuyuki; Tokuyasu, Takashi; Takahashi, Nobuo; Tanaka, Yoshio; Sugitsue, Noritake

    2012-07-01

    Some of nuclear facilities that would no longer be required have been decommissioned in JAEA (Japan Atomic Energy Agency). A lot of nuclear facilities have to be decommissioned in JAEA in near future. To implement decommissioning of nuclear facilities, it was important to make a rational decommissioning plan. Therefore, project management data evaluation system for dismantling activities (PRODIA code) has been developed, and will be useful for making a detailed decommissioning plan for an object facility. Dismantling of dry conversion facility in the uranium refining and conversion plant (URCP) at Ningyo-toge began in 2008. During dismantling activities, project management data such as manpower and amount of waste generation have been collected. Such collected project management data has been evaluated and used to establish a calculation formula to calculate manpower for dismantling equipment of chemical process and calculate manpower for using a green house (GH) which was a temporary structure for preventing the spread of contaminants during dismantling. In the calculation formula to calculate project management data related to dismantling of equipment, the relation of dismantling manpower to each piece of equipment was evaluated. Furthermore, the relation of dismantling manpower to each chemical process was evaluated. The results showed promise for evaluating dismantling manpower with respect to each chemical process. In the calculation formula to calculate project management data related to use of the GH, relations of GH installation manpower and removal manpower to GH footprint were evaluated. Furthermore, the calculation formula for secondary waste generation was established. In this study, project management data related to dismantling of equipment and use of the GH were evaluated and analyzed. The project management data, manpower for dismantling of equipment, manpower for installation and removal of GH, and secondary waste generation from GH were considered. Establishment of the calculation formula for dismantling of each kind of equipment makes it possible to evaluate manpower for dismantling the whole facility. However, it is not easy to prepare calculation formula for all kinds of equipment that exist in the facility. Therefore, a simpler evaluation method was considered to calculate manpower based on facility characteristics. The results showed promise for evaluating dismantling manpower with respect to each chemical process. For dismantling of contaminated equipment, a GH has been used for protection of the spread of contamination. The use of a GH increases manpower for installation and removal of GH etc. Moreover, structural materials of the GH such as plastic sheets, adhesive tape become a burnable secondary waste. To create an effective dismantling plan, it is necessary to carefully consider use of a GH preliminarily. Thus, an evaluation method of project management data such as manpower and secondary waste generation was considered. The results showed promise for evaluating project management data of GH by using established calculation formula. (authors)

  20. Reengineering of Analytical Data Management for the Environmental Restoration Project at Los Alamos National Laboratory

    SciTech Connect (OSTI)

    Bolivar, S.; Dorries, A.; Nasser, K.; Scherma, S.

    2003-02-27

    The Environmental Restoration (ER) Project at Los Alamos National Laboratory (LANL) is responsible for the characterization, clean up, and monitoring of over 2,124 identified potential release sites (PRS). These PRSs have resulted from operations associated with weapons and energy related research which has been conducted at LANL since 1942. To accomplish mission goals, the ER Project conducts field sampling to determine possible types and levels of chemical contamination as well as their geographic extent. Last fiscal year, approximately 4000 samples were collected during ER Project field sampling campaigns. In the past, activities associated with field sampling such as sample campaign planning, paperwork, shipping and analytical laboratory tracking; verification and order fulfillment; validation and data quality assurance were performed by multiple groups working with a variety of software applications, databases and hard copy reports. This resulted in significant management and communication difficulties, data delivery delays, and inconsistent processes; it also represented a potential threat to overall data integrity. Creation of an organization, software applications and a data process that could provide for cost-effective management of the activities and data mentioned above became a management priority, resulting in a development of a reengineering task. This reengineering effort--currently nearing completion--has resulted in personnel reorganization, the development of a centralized data repository, and a powerful web-based sample management system that allows for an appreciably streamlined and more efficient data process. These changes have collectively cut data delivery times, allowed for larger volumes of samples and data to be handled with fewer personnel, and resulted in significant cost savings. This paper will provide a case study of the reengineering effort undertaken by the ER Project of its analytical data management process. It includes descriptions of strategic planning, personnel reorganization, process reengineering, software development, data repository development, and web development.

  1. Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000

    SciTech Connect (OSTI)

    DOE /NV

    2000-04-01

    This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls.

  2. Project Manager, U.S. ITER INSIDE: ITER Site Progress Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ITER exhibit at AAAS annual meeting. - Ned Sauthoff Project Manager, U.S. ITER INSIDE: ITER Site Progress Washington Reception Key Words for 2011 View from DOE U.S. Project Highlights Engaging Industry ITER Research Internship ITER Summer School Positions Open at ITER HQ Upcoming Events Members of the U.S. ITER team recently returned from Washington, D.C., where we used the large U.S. ITER exhibit at the annual meeting of the American Association for the Advancement of Science to increase

  3. RECIPIENT: NREL u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    lA ' OJ ) RECIPIENT: NREL u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION Page 1 of3 STATE: VT PROJECT TITL.E: Response to Increasing Turbine Cut* ln Speed at the Sheffield Wind Farm, Vermont, NREL Tracking No. 12-002 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number NREl-12-OO2 G010337 Based on my review oflbc information concerning the proposed action, as NEPA Compliance Omcer (authorized under DOE Order 451 .IA), I

  4. Project Schedules and Milestones September 2008 Site Management Plan Page 5…1

    Office of Legacy Management (LM)

    September 2009 Site Management Plan Page 1 5.0 Project Schedules and Milestones (FYs 2010-2012) 5.1 Establishing Project Schedules and Milestones As stated in Section 1.1.2, the SMP establishes the overall plan for remedial actions at the MMTS and milestones against which progress can be measured. The SMP also documents the overall plan for remedial actions at the MVP Site, which was deleted from the NPL on February 28, 2000. The SMP was first prepared in 1995 and was revised annually from 1998

  5. Project Schedules and Milestones September 2008 Site Management Plan Page 5…1

    Office of Legacy Management (LM)

    December 2010 Site Management Plan Page 1 5.0 Project Schedules and Milestones (FYs 2011-2013) 5.1 Establishing Project Schedules and Milestones As stated in Section 1.1.2, the SMP establishes the overall plan for remedial actions at the MMTS and milestones against which progress can be measured. The SMP also documents the overall plan for remedial actions at the MVP Site, which was deleted from the NPL on February 28, 2000. The SMP was first prepared in 1995 and was revised annually from 1998

  6. Project T100 -- Hazardous Materials Management and Emergency Response Training Center (HAMMER)

    SciTech Connect (OSTI)

    Norton, C.E.

    1994-11-09

    The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design and construction of the Hazardous Materials Management and Emergency Response (HAMMER) Training Center, project 95L-EWT-100 at Hanford. The reviews and verifications will be on activities associated with design, procurement, and construction of the HAMMER project which includes, but is not limited to earthwork, placement of concrete, laying of rail, drilling of wells, water and sewer line fabrication and installation, communications systems, fire protection/detection systems, line tie-ins, building and mock-up (prop) construction, electrical, instrumentation, pump and valves and special coatings.

  7. Determinants of sustainability in solid waste management - The Gianyar Waste Recovery Project in Indonesia

    SciTech Connect (OSTI)

    Zurbruegg, Christian; Gfrerer, Margareth; Ashadi, Henki; Brenner, Werner; Kueper, David

    2012-11-15

    Highlights: Black-Right-Pointing-Pointer Our assessment tool helps evaluate success factors in solid waste projects. Black-Right-Pointing-Pointer Success of the composting plant in Indonesia is linked to its community integration. Black-Right-Pointing-Pointer Appropriate technology is not a main determining success factor for sustainability. Black-Right-Pointing-Pointer Structured assessment of 'best practices' can enhance replication in other cities. - Abstract: According to most experts, integrated and sustainable solid waste management should not only be given top priority, but must go beyond technical aspects to include various key elements of sustainability to ensure success of any solid waste project. Aside from project sustainable impacts, the overall enabling environment is the key feature determining performance and success of an integrated and affordable solid waste system. This paper describes a project-specific approach to assess typical success or failure factors. A questionnaire-based assessment method covers issues of: (i) social mobilisation and acceptance (social element), (ii) stakeholder, legal and institutional arrangements comprising roles, responsibilities and management functions (institutional element); (iii) financial and operational requirements, as well as cost recovery mechanisms (economic element). The Gianyar Waste Recovery Project in Bali, Indonesia was analysed using this integrated assessment method. The results clearly identified chief characteristics, key factors to consider when planning country wide replication but also major barriers and obstacles which must be overcome to ensure project sustainability. The Gianyar project consists of a composting unit processing 60 tons of municipal waste per day from 500,000 inhabitants, including manual waste segregation and subsequent composting of the biodegradable organic fraction.

  8. Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-11-01

    This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  9. Fernald Environmental Management Project Consent Agreement as Amended, September 20, 1991 Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fernald Environmental Management Project Consent Agreement as Amended Under CERCLA Sections 120 and 106(a), September 20, 1991 State Ohio Agreement Type Consent Agreement Legal Driver(s) CERCLA Scope Summary Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the Site Parties DOE; US EPA Date 9/20/1991 SCOPE * Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response

  10. Fernald Environmental Management Project Director's Final Findings & Orders, June 6, 1996

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    . - ~ June 6, 1996 Re: Director's Final Findings & Orders U.S. Department of Energy Cincinnati, Ohio U.S. EPA ID No: OH6890008976 Mr. Phil Hammric U.S. Department of Energy Femald Environmental Management Project P.O. Box 389705 Cincinnati, Ohio 45239 Mr. John Bradbume Femald Environmental Restoration Corporation P.0. Box 538704 Cincinnati, Ohio 45253-8704 Dear Mr. Hammric and Mr. Bradbume: Transmitted herewith are Final Findings and Orders of the Director concrrning the matter indicated

  11. Special Report on the Audit of the Management of Department of Energy Construction Projects, IG-0398

    Energy Savers [EERE]

    OFFICE OF INSPECTOR GENERAL SPECIAL REPORT ON THE AUDIT OF THE MANAGEMENT OF DEPARTMENT OF ENERGY CONSTRUCTION PROJECTS The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Golpher gopher.hr.doe.gov Department of Energy Headquarters

  12. I Mr. Sam Popowcer, PE Senior Project Manager BCM Engineers, Inc.

    Office of Legacy Management (LM)

    wrgv %%A% Washington, DC 20585 WY, 0 I Mr. Sam Popowcer, PE Senior Project Manager BCM Engineers, Inc. 1 Plymouth Meeting Mall Plymouth Meeting, Pennsylvania 19462 Dear Mr. Popowcer: This is a follow-up letter to our telephone conversation of July 24, 1991. Your company is providing research services to the U.S. Army Corps of Engineers for the Department of Defense former site restoration program. You requested information from the Department of Energy (DOE) concerning the Ashland Site in

  13. Mr. Donald II. Simpson Uranium and Special Projects Unit Hazardous Materials and Waste Management Division

    Office of Legacy Management (LM)

    AUG 0 3 1998 Mr. Donald II. Simpson Uranium and Special Projects Unit Hazardous Materials and Waste Management Division Colorado Department of Public Health and Environment 4300 Cherry Creek Dr. S. Denver, Colorado 80222-1530 _,l ' 7. ,;:""" I,!._ -~~ . Dear Mr. Simpson: We have reviewed your letter of July 10, 1998, requesting that the Department of Energy (DOE) reconsider its decision to exclude the Marion Millsite in Boulder County, Colorado, from remediation under the Formerly

  14. Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-40)

    SciTech Connect (OSTI)

    N /A

    2004-07-16

    BPA proposes to fund the acquisition of two parcels in Benewah County, Idaho with the Coeur d'Alene Tribe. These parcels encompass approximately 475 acres of riparian and potential riparian habitat along Hangman Creek on the Coeur d'Alene Indian Reservation. The goal of this project is to protect, mitigate, and enhance wildlife affected by the construction and operation of the Federal hydroelectric facilities on the Columbia River. The current proposal includes only the fee title acquisition of these parcels; habitat enhancement activities will likely be carried out by the Coeur d'Alene Tribe in the future following the development of a management plan(s) for the lands.

  15. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    SciTech Connect (OSTI)

    SHOOP, D.S.

    1999-09-10

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment.

  16. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    SciTech Connect (OSTI)

    1995-07-14

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system.

  17. Asset Management Strategies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Efficiency and Fish and Wildlife asset categories. The CAB, in consultation with affected business units and the Asset Management Executive Sponsors, determines whether and how...

  18. Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

    SciTech Connect (OSTI)

    Casella, Amanda J.; Pereira, Mario M.; Steen, Franciska H.

    2013-01-01

    This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

  19. UMTRA Surface Project management action process document. Final report: Revision 1

    SciTech Connect (OSTI)

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

  20. Wildlife Protection, Mitigation, and Enhancement Planning Phase II, Dworshak Reservoir, Final Report.

    SciTech Connect (OSTI)

    Hansen, H. Jerome; Martin, Robert C.

    1989-11-01

    The Pacific Northwest Electric Power Planning and Conservation Act of 1980 directed that measures be implemented to protect, mitigate, and enhance fish and wildlife to the extent affected by development and operation of hydropower projects on the Columbia River System. This Act created the Northwest Power Planning Council, which in turn developed the Columbia River Basin Fish and Wildlife Program. This program established a four-part process: wildlife mitigation status reports; wildlife impact assessments; wildlife protection, mitigation, and enhancement plans; and implementation of protection, mitigation, and enhancement projects. This mitigation plan for the Dworshak Reservoir Hydroelectric Facility was developed to fulfill requirements of Sections 1003(b)(2) and (3) of the Columbia River Basin Fish and Wildlife Program. Specific objectives of wildlife protection, mitigation, and enhancement planning for Dworshak Reservoir included: quantify net impacts to target wildlife species affected by hydroelectric development and operation of Dworshak Dam and Reservoir; develop protection, mitigation, and enhancement goals and objectives for the target wildlife species; recommend protection, mitigation, and enhancement actions for the target wildlife species; and coordination of project activities. 46 refs., 4 figs., 31 tabs.

  1. About Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Projects MicroBooNE Project Web Pages The Project Pages hold information and links for the collaboration and its Project Managers, and also hold links to project Director's and...

  2. Audit of Work Force Restructuring at the Fernald Environmental Management Project, ER-B-96-01

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy Office of Inspector General AUDIT OF WORK FORCE RESTRUCTURING AT THE FERNALD ENVIRONMENTAL MANAGEMENT PROJECT Report Number: ER-B-96-01 Eastern Regional Audit Office Date of Issue: April 23, 1996 Oak Ridge, Tennessee 37830 AUDIT OF WORK FORCE RESTRUCTURING AT THE FERNALD ENVIRONMENTAL MANAGEMENT PROJECT TABLE OF CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . 1 PART I - APPROACH AND OVERVIEW 3 Introduction . . . . . . . . . . . . . . . 3 Scope and

  3. Office of Legacy Management Decision Tree for Solar Photovoltaic Projects - 13317

    SciTech Connect (OSTI)

    Elmer, John; Butherus, Michael; Barr, Deborah L.

    2013-07-01

    To support consideration of renewable energy power development as a land reuse option, the DOE Office of Legacy Management (LM) and the National Renewable Energy Laboratory (NREL) established a partnership to conduct an assessment of wind and solar renewable energy resources on LM lands. From a solar capacity perspective, the larger sites in the western United States present opportunities for constructing solar photovoltaic (PV) projects. A detailed analysis and preliminary plan was developed for three large sites in New Mexico, assessing the costs, the conceptual layout of a PV system, and the electric utility interconnection process. As a result of the study, a 1,214-hectare (3,000-acre) site near Grants, New Mexico, was chosen for further study. The state incentives, utility connection process, and transmission line capacity were key factors in assessing the feasibility of the project. LM's Durango, Colorado, Disposal Site was also chosen for consideration because the uranium mill tailings disposal cell is on a hillside facing south, transmission lines cross the property, and the community was very supportive of the project. LM worked with the regulators to demonstrate that the disposal cell's long-term performance would not be impacted by the installation of a PV solar system. A number of LM-unique issues were resolved in making the site available for a private party to lease a portion of the site for a solar PV project. A lease was awarded in September 2012. Using a solar decision tree that was developed and launched by the EPA and NREL, LM has modified and expanded the decision tree structure to address the unique aspects and challenges faced by LM on its multiple sites. The LM solar decision tree covers factors such as land ownership, usable acreage, financial viability of the project, stakeholder involvement, and transmission line capacity. As additional sites are transferred to LM in the future, the decision tree will assist in determining whether a solar PV project is feasible on the new sites. (authors)

  4. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    SciTech Connect (OSTI)

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  5. Solid waste information and tracking system client-server conversion project management plan

    SciTech Connect (OSTI)

    May, D.L.

    1998-04-15

    This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion. It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  6. Health Education Specialist/Project Manager Oak Ridge Institute for Science and Education

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    inFormation about the CHRIS faith-based approach to addressing minority health disparities in your community, please contact: rose marie Womble, mSSW Health Education Specialist/Project Manager Oak Ridge Institute for Science and Education P.O. Box 117, MS-37 Oak Ridge, TN 37831-0117 E-mail: rose.womble@orise.orau.gov Telephone: 865.576.6256 Fax: 865.241.3851 "The beauty of the CHRIS program is that it's tailored to provide information that addresses a wide array of health issues within a

  7. Fernald Environmental Management Project Director's Final Findings & Orders, September 10, 1993

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEPI o 1993 OHIO ENlmo In the Matter of: U. S. Department of Energy Femald Environmental Management Project P.O. Box 389705 Cincinnati, Ohio 45239 Issue Date: Effective Date: SEP1 0 1993 BEFORE THF, NMENTAL PROTECTION AGENCY . Director's Final Fi&in~s and Orders PREAMBLE It is hereby agreed by and among the parties hereto as follows: I. J-VRISDICTION These Director's F;ina.lFindings and Orders ("Orders") are issued to the U.S. Department of Energy ("Respondent") pursuant

  8. The mixed waste management facility. Project baseline revision 1.2

    SciTech Connect (OSTI)

    Streit, R.D.; Throop, A.L.

    1995-04-01

    Revision 1.2 to the Project Baseline (PB) for the Mixed Waste Management Facility (MWMF) is in response to DOE directives and verbal guidance to (1) Collocate the Decontamination and Waste Treatment Facility (DWTF) and MWMF into a single complex, integrate certain and overlapping functions as a cost-saving measure; (2) Meet certain fiscal year (FY) new-BA funding objectives ($15.3M in FY95) with lower and roughly balanced funding for out years; (3) Reduce Total Project Cost (TPC) for the MWMF Project; (4) Include costs for all appropriate permitting activities in the project TPC. This baseline revision also incorporates revisions in the technical baseline design for Molten Salt Oxidation (MSO) and Mediated Electrochemical Oxidation (MEO). Changes in the WBS dictionary that are necessary as a result of this rebaseline, as well as minor title changes, at WBS Level 3 or above (DOE control level) are approved as a separate document. For completeness, the WBS dictionary that reflects these changes is contained in Appendix B. The PB, with revisions as described in this document, were also the basis for the FY97 Validation Process, presented to DOE and their reviewers on March 21-22, 1995. Appendix C lists information related to prior revisions to the PB. Several key changes relate to the integration of functions and sharing of facilities between the portion of the DWTF that will house the MWMF and those portions that are used by the Hazardous Waste Management (HWM) Division at LLNL. This collocation has been directed by DOE as a cost-saving measure and has been implemented in a manner that maintains separate operational elements from a safety and permitting viewpoint. Appendix D provides background information on the decision and implications of collocating the two facilities.

  9. Real-Time Water Quality Monitoring and Habitat Assessment in theSan Luis National Wildlife Refuge

    SciTech Connect (OSTI)

    Quinn, Nigel W.T.; Hanlon, Jeremy S.; Burns, Josephine R.; Stromayer, Karl A.K.; Jordan, Brandon M.; Ennis, Mike J.; Woolington,Dennis W.

    2005-08-28

    The project report describes a two year experiment to control wetland drainage to the San Joaquin River of California from the San Luis National Wildlife Refuge using a decision support system for real-time water quality management. This system required the installation and operation of one inlet and three drainage flow and water quality monitoring stations which allowed a simple mass balance model to be developed of the seasonally managed wetlands in the study area. Remote sensing methods were developed to document long-term trends in wetland moist soil vegetation and soil salinity in response to management options such as delaying the initiation of seasonal wetland drainage. These environmental management tools provide wetland managers with some of the tools necessary to improve salinity conditions in the San Joaquin River and improve compliance with State mandated salinity objectives without inflicting long-term harm on the wild fowl habitat resource.

  10. An aerial radiological survey of the Fernald Environmental Management Project and surrounding area, Fernald, Ohio

    SciTech Connect (OSTI)

    Phoenix, K.A.

    1997-04-01

    An aerial radiological survey was conducted from May 17--22, 1994, over a 36 square mile (93 square kilometer) area centered on the Fernald Environmental Management Project located in Fernald, Ohio. The purpose of the survey was to detect anomalous gamma radiation in the environment surrounding the plant. The survey was conducted at a nominal altitude of 150 feet (46 meters) with a line spacing of 250 feet (76 meters). A contour map of the terrestrial gamma exposure rate extrapolated to 1 meter (3.3 feet) above ground was prepared and overlaid on an aerial photograph of the area. Analysis of the data for man made sources showed five sites within the boundaries of the Fernald Environmental Management Project having elevated readings. The exposure rates outside the plant boundary were typical of naturally occurring background radiation. Soil samples and pressurized ion chamber measurements were obtained at four locations within the survey boundaries to supplement the aerial data. It was concluded that although the radionuclides identified in the high-exposure-rate areas are naturally occurring, the levels encountered are greatly enhanced due to industrial activities at the plant.

  11. Wildlife Resources | Open Energy Information

    Open Energy Info (EERE)

    Resources Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleWildlifeResources&oldid612286" Feedback Contact needs updating Image needs...

  12. Material and energy recovery in integrated waste management systems: Project overview and main results

    SciTech Connect (OSTI)

    Consonni, Stefano; Giugliano, Michele; Massarutto, Antonio; Saccani, Cesare

    2011-09-15

    Highlights: > The source separation level (SSL) of waste management system does not qualify adequately the system. > Separately collecting organic waste gives less advantages than packaging materials. > Recycling packaging materials (metals, glass, plastics, paper) is always attractive. > Composting and anaerobic digestion of organic waste gives questionable outcomes. > The critical threshold of optimal recycling seems to be a SSL of 50%. - Abstract: This paper describes the context, the basic assumptions and the main findings of a joint research project aimed at identifying the optimal breakdown between material recovery and energy recovery from municipal solid waste (MSW) in the framework of integrated waste management systems (IWMS). The project was carried out from 2007 to 2009 by five research groups at Politecnico di Milano, the Universities of Bologna and Trento, and the Bocconi University (Milan), with funding from the Italian Ministry of Education, University and Research (MIUR). Since the optimization of IWMSs by analytical methods is practically impossible, the search for the most attractive strategy was carried out by comparing a number of relevant recovery paths from the point of view of mass and energy flows, technological features, environmental impact and economics. The main focus has been on mature processes applicable to MSW in Italy and Europe. Results show that, contrary to a rather widespread opinion, increasing the source separation level (SSL) has a very marginal effects on energy efficiency. What does generate very significant variations in energy efficiency is scale, i.e. the size of the waste-to-energy (WTE) plant. The mere value of SSL is inadequate to qualify the recovery system. The energy and environmental outcome of recovery depends not only on 'how much' source separation is carried out, but rather on 'how' a given SSL is reached.

  13. Colorado Division of Wildlife | Open Energy Information

    Open Energy Info (EERE)

    Wildlife Jump to: navigation, search Name: Colorado Parks and Wildlife Address: 1313 Sherman Street, Suite 618 Place: Denver, Colorado Zip: 80203 Phone Number: (303) 866-3437...

  14. Integration of health physics, safety and operational processes for management and disposition of recycled uranium wastes at the Fernald Environmental Management Project (FEMP)

    SciTech Connect (OSTI)

    Barber, James; Buckley, James

    2003-02-23

    Fluor Fernald, Inc. (Fluor Fernald), the contractor for the U. S. Department of Energy (DOE) Fernald Environmental Management Project (FEMP), recently submitted a new baseline plan for achieving site closure by the end of calendar year 2006. This plan was submitted at DOE's request, as the FEMP was selected as one of the sites for their accelerated closure initiative. In accordance with the accelerated baseline, the FEMP Waste Management Project (WMP) is actively evaluating innovative processes for the management and disposition of low-level uranium, fissile material, and thorium, all of which have been classified as waste. These activities are being conducted by the Low Level Waste (LLW) and Uranium Waste Disposition (UWD) projects. Alternatives associated with operational processing of individual waste streams, each of which poses potentially unique health physics, industrial hygiene and industrial hazards, are being evaluated for determination of the most cost effective and safe met hod for handling and disposition. Low-level Mixed Waste (LLMW) projects are not addressed in this paper. This paper summarizes historical uranium recycling programs and resultant trace quantity contamination of uranium waste streams with radionuclides, other than uranium. The presentation then describes how waste characterization data is reviewed for radiological and/or chemical hazards and exposure mitigation techniques, in conjunction with proposed operations for handling and disposition. The final part of the presentation consists of an overview of recent operations within LLW and UWD project dispositions, which have been safely completed, and a description of several current operations.

  15. Fifteenmile Basin Habitat Enhancement Project: Annual Report...

    Office of Scientific and Technical Information (OSTI)

    wild winter steelhead in the Fifteenmile Creek Basin under the Columbia River Basin Fish and Wildlife Program. The project is funded by through the Bonneville Power...

  16. Environmental Report Project Informs Paducah Community, Educates...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    assembled at the West Kentucky Wildlife Management Area (WKWMA) lodge to participate in a ... the students will be using in the classroom, and discussed environmental ...

  17. R[ CIPIENT:NREL U.S. DEPARThLFNT OF ENERGY EER E PROJECT MANAGEMENT CENTER

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    R[ CIPIENT:NREL U.S. DEPARThLFNT OF ENERGY EER E PROJECT MANAGEMENT CENTER NEPA DETl!RMINATION Page 1 00 STATE: CO PROJECT TITLE: Regional Test Center Project: Solar Technology Acceleration Center (SolarTAC); NREL Tracking No. 12- 007 Funding Opportunity Announcement Number Procu.-emtnt Instrument Number NEPA Control Number em Number NREl* 12-OO7 0 Based on my review oftbe information coU(:erning the proposed action, as NEPA Compliance Officer (authorlzed under DOE Order 45I.1A), I have made the

  18. Projecting

    U.S. Energy Information Administration (EIA) Indexed Site

    Projecting the scale of the pipeline network for CO2-EOR and its implications for CCS ... for CO 2 -EOR and CO 2 transportation for CCS assuming a carbon price are discussed. ...

  19. Idaho Cleanup Project CPP-603A basin deactivation waste management 2007

    SciTech Connect (OSTI)

    Croson, D.V.; Davis, R.H.; Cooper, W.B.

    2007-07-01

    The CPP-603A basin facility is located at the Idaho Nuclear Technology and Engineering Center (INTEC) at the U.S. Department of Energy's (DOE) Idaho National Laboratory (INL). CPP-603A operations are part of the Idaho Cleanup Project (ICP) that is managed by CH2M-WG Idaho, LLC (CWI). Once the inventoried fuel was removed from the basins, they were no longer needed for fuel storage. However, they were still filled with water to provide shielding from high activity debris and contamination, and had to either be maintained so the basins did not present a threat to public or worker health and safety, or be isolated from the environment. The CPP-603A basins contained an estimated 50,000 kg (110,200 lbs) of sludge. The sludge was composed of desert sand, dust, precipitated corrosion products, and metal particles from past cutting operations. The sediment also contained hazardous constituents and radioactive contamination, including cadmium, lead, and U-235. An Engineering Evaluation/Cost Analysis (EE/CA), conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), evaluated the risks associated with deactivation of the basins and the alternatives for addressing those risks. The recommended action identified in the Action Memorandum was to perform interim stabilization of the basins. The sludge in the basins was removed and treated in accordance with the Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) and disposed at the INL Radioactive Waste Management Complex (RWMC). A Non-Time Critical Removal Action (NTCRA) was conducted under CERCLA to reduce or eliminate other hazards associated with maintaining the facility. The CERCLA NTCRA included removing a small high-activity debris object (SHADO 1); consolidating and mapping the location of debris objects containing Co-60; removing, treating, and disposing of the basin water; and filling the basins with grout/controlled low strength material (CLSM). The NTCRA is an interim action that reduces the risks to human health and the environment by minimizing the potential for release of hazardous substances. The interim action does not prejudice the final end-state alternative. (authors)

  20. EIS-0246: Wildlife Mitigation Program, Idaho, Montana, Nevada, Washington, Oregon

    Broader source: Energy.gov [DOE]

    BPA has decided to adopt the set of prescriptions (goals, strategies, and procedural requirements) identified in the final EIS as Alternative 6, Balanced Action (BPAs Preferred Alternative). This decision will standardize the planning and implementation process, while achieving balance among all decision factors: (1) meeting the biological objectives of wildlife mitigation projects, (2) achievement of cost and administrative efficiency, (3) compliance with all applicable laws and regulations, and (4) protection and improvement of other environmental resources when such actions would support wildlife mitigation.

  1. Washington State Department of Fish and Wildlife | Open Energy...

    Open Energy Info (EERE)

    Fish and Wildlife Jump to: navigation, search Logo: Washington State Department of Fish and Wildlife Name: Washington State Department of Fish and Wildlife Abbreviation: WDFW...

  2. Oregon Department of Fish and Wildlife | Open Energy Information

    Open Energy Info (EERE)

    Fish and Wildlife Jump to: navigation, search Logo: Oregon Department of Fish and Wildlife Name: Oregon Department of Fish and Wildlife Address: 3406 Cherry Ave. NE Place: Salem,...

  3. California Department of Fish & Wildlife | Open Energy Information

    Open Energy Info (EERE)

    & Wildlife Jump to: navigation, search Logo: California Department of Fish & Wildlife Name: California Department of Fish & Wildlife Address: 1416 9th St, 12th Floor Place:...

  4. Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program

    SciTech Connect (OSTI)

    Connolly, M.J.; Sayer, D.L.

    1993-11-01

    EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

  5. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    SciTech Connect (OSTI)

    None, None

    2013-03-31

    Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation standards established by UT and will complete the contact hours required of training to apply to the Certification on Energy Management (CEM) offered by the Association of Energy Engineers (AEE). The CBO training program consists of a combination of theory (classroom), online & computer simulation, laboratory & hands on (onsite) training lessons. The training is addressed four basic learning elements: (1) Learn the Technology; (2) Practice Skills with hands-on the Energy Simulation Builder program; (3) Final Project and Presentation; and, (4) Accreditation and Certifications.

  6. Design of the Long-term Waste Management Facility for Historic LLRW Port Hope Project - 13322

    SciTech Connect (OSTI)

    Campbell, Don; Barton, David; Case, Glenn

    2013-07-01

    The Municipality of Port Hope is located on the northern shores of Lake Ontario approximately 100 km east of Toronto, Ontario, Canada. Starting in the 1930's, radium and later uranium processing by Eldorado Gold Mines Limited (subsequently Eldorado Nuclear Limited) (Eldorado) at their refinery in Port Hope resulted in the generation of process residues and wastes that were disposed of indiscriminately throughout the Municipality until about the mid-1950's. These process residues contained radium (Ra- 226), uranium, arsenic and other contaminants. Between 1944 and 1988, Eldorado was a Federal Crown Corporation, and as such, the Canadian Federal Government has assumed responsibility for the clean-up and long-term management of the historic waste produced by Eldorado during this period. The Port Hope Project involves the construction and development of a new long-term waste management facility (LTWMF), and the remediation and transfer of the historic wastes located within the Municipality of Port Hope to the new LTWMF. The new LTWMF will consist of an engineered above-ground containment mound designed to contain and isolate the wastes from the surrounding environment for the next several hundred years. The design of the engineered containment mound consists of a primary and secondary composite base liner system and composite final cover system, made up of both natural materials (e.g., compacted clay, granular materials) and synthetic materials (e.g., geo-synthetic clay liner, geo-membrane, geo-textiles). The engineered containment mound will cover an area of approximately 13 hectares and will contain the estimated 1.2 million cubic metres of waste that will be generated from the remedial activities within Port Hope. The LTWMF will also include infrastructure and support facilities such as access roads, administrative offices, laboratory, equipment and personnel decontamination facilities, waste water treatment plant and other ancillary facilities. Preliminary construction activities for the Port Hope LTWMF commenced in 2012 and are scheduled to continue over the next few years. The first cell of the engineered containment mound is scheduled to be constructed in 2015 with waste placement into the Port Hope LTWMF anticipated over the following seven year period. (authors)

  7. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    SciTech Connect (OSTI)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  8. U.S. DEPARTJl.1ENT OF ENERGY EERE PROJECT MANAGEMENT CENTER

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 of2 G) .. j' .. STATE: NY PROJECT TITLE; Improving atmospheric models for offshore wind resource mapping and prediction using UDAR , aircraft, and in-ocean observations...

  9. Hydrologic Resources Management Program and Underground Test Area Project FY 2006 Progress Report

    SciTech Connect (OSTI)

    Culham, H W; Eaton, G F; Genetti, V; Hu, Q; Kersting, A B; Lindvall, R E; Moran, J E; Blasiyh Nuno, G A; Powell, B A; Rose, T P; Singleton, M J; Williams, R W; Zavarin, M; Zhao, P

    2008-04-08

    This report describes FY 2006 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains four chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and National Security Technologies (NSTec). Chapter 1 is a summary of FY 2006 sampling efforts at near-field 'hot' wells at the NTS, and presents new chemical and isotopic data for groundwater samples from four near-field wells. These include PM-2 and U-20n PS 1DDh (CHESHIRE), UE-7ns (BOURBON), and U-19v PS No.1ds (ALMENDRO). Chapter 2 is a summary of the results of chemical and isotopic measurements of groundwater samples from three UGTA environmental monitoring wells. These wells are: ER-12-4 and U12S located in Area 12 on Rainier Mesa and USGS HGH No.2 WW2 located in Yucca Flat. In addition, three springs were sampled White Rock Spring and Captain Jack Spring in Area 12 on Rainier Mesa and Topopah Spring in Area 29. Chapter 3 is a compilation of existing noble gas data that has been reviewed and edited to remove inconsistencies in presentation of total vs. single isotope noble gas values reported in the previous HRMP and UGTA progress reports. Chapter 4 is a summary of the results of batch sorption and desorption experiments performed to determine the distribution coefficients (Kd) of Pu(IV), Np(V), U(VI), Cs and Sr to zeolitized tuff (tuff confining unit, TCU) and carbonate (lower carbonate aquifer, LCA) rocks in synthetic NTS groundwater Chapter 5 is a summary of the results of a series of flow-cell experiments performed to examine Np(V) and Pu(V) sorption to and desorption from goethite. Np and Pu desorption occur at a faster rate and to a greater extent than previously reported. In addition, oxidation changes occurred with the Pu whereby the surface-sorbed Pu(IV) was reoxidized to aqueous Pu(V) during desorption.

  10. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    SciTech Connect (OSTI)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans.

  11. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  12. Forrest Conservation Area : Management & Implementation FY 2004 Annual Report.

    SciTech Connect (OSTI)

    Smith, Brent

    2008-12-01

    The Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Conservation Area during July of 2002. The property is located in the Upper John Day subbasin within the Columbia basin. The property consists of two parcels comprising 4,232 acres. The Mainstem parcel consists of 3,445 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem John Day River. The Middle Fork parcel consists of 786 acres and is located one mile to the west of the town of Austin, OR on the Middle Fork John Day River. The Forrest Conservation Area is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. Acquisition of the Forrest Conservation Area was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by hydroelectric facilities on the Columbia River and its tributaries. The intent of the Conservation Area is to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, {section}11.1, {section}7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of management funding for the protection and restoration of fish and wildlife habitat through a memorandum of agreement.

  13. Ecosystem-Based Management Tools Network Webinar: Community-Based Sea Level Rise Projections

    Broader source: Energy.gov [DOE]

    Washington Sea Grant has partnered with the Jamestown S'Klallam Tribe and Adaptation International to develop local sea level rise projections and sea level scenario maps for the Jamestown S...

  14. DOE Order Program and Project Management for the Acquisition of Capital Assets

    Broader source: Energy.gov [DOE]

    The goal of this Guide is to provide the Department of Energy's federal project directors (FPDs) with the knowledge, methodologies and tools needed to meet Order 413.3A's requirement that they plan...

  15. u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER Nl!PA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NlPA DE1'ER.IINATTON RECIPIENT: Kansas Corporation Commission - Renewable Energy Subgrant PROJECT TITLE: EECBG DE-EEOOOO727 City of Prairie Village Page 1 of2 STATE: KS Funding ...

  16. DOE - Office of Legacy Management -- Project Gas Buggy Site - NM 14

    Office of Legacy Management (LM)

    Gas Buggy Site - NM 14 FUSRAP Considered Sites Site: Project Gas Buggy Site (NM.14 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gasbuggy, New Mexico, Site Nevada Test Site History Documents Related to Project Gas Buggy Site Fact Sheet Gasbuggy, New Mexico The Gasbuggy Site is located in northwestern New Mexico in Rio Arriba County

  17. DOE - Office of Legacy Management -- Project Rio Blanco - CO 0-09

    Office of Legacy Management (LM)

    Rio Blanco - CO 0-09 FUSRAP Considered Sites Site: Project Rio Blanco (CO.0-09) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: ~ 52 miles north of Grand Junction, Co. , Rio Blanco County , Colorado CO.0-09-1 Evaluation Year: 1985 CO.0-09-1 Site Operations: The project was a cooperative research effort undertaken in 1973 between CER Geonuclear Corp, Continental Oil Co (Conoco), and the US Energy Research and Development Administration

  18. DOE - Office of Legacy Management -- Project Rulison - CO 0-10

    Office of Legacy Management (LM)

    Rulison - CO 0-10 FUSRAP Considered Sites Site: PROJECT RULISON (CO.0-10) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Southwest limb of the Piceance Creek Basin , Garfield County , Colorado CO.0-10-1 Evaluation Year: 1985 CO.0-10-1 Site Operations: The project was a Plowshare experiment conducted from 1969-1971 to determine the commercial feasibility of nuclear stimulation of natural gas reservoirs. CO.0-10-1 Site Disposition:

  19. Potl,,]) u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... REASON: o Proposed action filS within a categorical exclusion but involves a high profi le or controversial issue thaI warrants Field Office Manager's attention. o Proposed action ...

  20. u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER Nl!PA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... final NEP A decision, you are doing so at risk of not receivi ng federal funding and such ... Manager's attention. o Proposed action falls withi n an EA or EIS category and ...

  1. Infrastructure support for a waste management institute. Final project report, September 12, 1994--September 11, 1997

    SciTech Connect (OSTI)

    1997-11-01

    North Carolina A and T State University has completed the development of an infrastructure for the interdisciplinary Waste Management Institute (WMI). The Interdisciplinary Waste Management Institute (WMI) was approved in June, 1994 by the General Administration of the University of North Carolina as an academic support unit with research and public service functions. The mission of the WMI is to enhance awareness and understanding of waste management issues and to provide instructional support including research and outreach. The goals of WMI are as follows: increase the number of minority professionals who will work in waste management fields; develop cooperative and exchange programs involving faculty, students, government, and industry; serve as institutional sponsor of public awareness workshops and lecture series; and support interdisciplinary research programs. The vision of the WMI is to provide continued state-of-the art environmental educational programs, research, and outreach.

  2. Hydrologic Resources Management Program and Underground Test Area Project FY 2001-2002 Progress Report

    SciTech Connect (OSTI)

    Rose, T P; Kersting, A B; Harris, L J; Hudson, G B; Smith, D K; Williams, R W; Loewen, D R; Nelson, E J; Allen, P G; Ryerson, F J; Pawloski, G A; Laue, C A; Moran, J E

    2003-08-15

    This report contains highlights of FY 2001 and 2002 technical studies conducted by the Analytical and Nuclear Chemistry Division (ANCD) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area (UGTA) Project. These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work emphasizes the Defense Programs goal of responsible management of natural resources at the NTS, while UGTA-funded work focuses on defining the extent of radionuclide contamination in NTS groundwater resulting from underground nuclear testing. The report is organized on a topical basis, and contains eight chapters that reflect the range of technical work performed by LLNL-ANCD in support of HRMP and UGTA. Chapter 1 describes recent hot well sampling efforts at the NTS, and presents the results of chemical and isotopic analyses of groundwater samples from six near-field wells. These include the Cambric (UE-5n), Bilby (U-3cn PS No.2), Bourbon (UE-7nS), Nash (UE-2ce), Tybo/Benham (ER-20-5 No.3), and Almendro (U-19v PS No.1ds) sites. The data generated by the hot well program is vital to the development and validation of contaminant transport models at the NTS. Chapter 2 discusses the results of xenon isotope measurements of groundwater samples from the six near-field wells described in Chapter 1. This work demonstrates that fission xenon is present in the water at levels that are readily measurable and highlights the significant differences in xenon concentrations and isotopic abundances at different sites. These differences provide insight into the early cooling history of nuclear test cavities, and may assist in predicting the distribution of the source term in the near-field environment. Chapter 3 is an investigation of the distribution and abundance of actinides in a nuclear test cavity and chimney. This work demonstrates that early-time processes can widely disperse actinides at low concentrations outside the melt glass, implying that melt glass dissolution may not be the sole mechanism for the release of actinides to groundwater. The study also provides evidence for the isotopic fractionation of plutonium under the extreme conditions accompanying nuclear explosions. In Chapter 4, X-ray absorption spectroscopy measurements were used to determine the redox state of Fe and U in nuclear melt glass samples from the NTS. Both elements were found to occur in mixed valence states (Fe{sup 2+}/Fe{sup 3+} and U{sup 5+}/U{sup 6+}) in all samples. Comparison of the Fe and U redox states with published redox studies of synthetic glasses suggests that plutonium is predominantly in the Pu{sup 4+} oxidation state in the melt glasses. In Chapter 5, alpha autoradiography is used in a NTS field study to investigate the spatial distribution and transport of actinides in soils, and to help identify the size distribution and morphology of the actinide particles. It was found that {alpha}-emitting radionuclides have moved to at least 39 cm depth in the soil profile, far deeper than expected. The methodology that was developed could easily be applied to other field locations where actinides are dispersed in the soil zone. Chapter 6 summarizes the development of a method for measuring environmental levels of {sup 241}Am on the multi-collector inductively coupled plasma mass spectrometer. The method detection limit of 0.017 pCi/L is about two times lower than the best analyses possible by alpha spectrometry. Chapter 7 describes a chlorine-36 study of vertical groundwater transport processes in Frenchman Flat. Mass balance calculations developed from a {sup 36}Cl mixing model at well ER-5-3 No.2 are used to estimate vertical transport fluxes and average vertical flow velocities through the thick volcanic section underlying the basin. The study also documents the variations in {sup 36}Cl/Cl ratios within the three princ

  3. Development of a Network-Based Information Infrastructure for Fisheries and Hydropower Information in the Columbia River Basin : Final Project Report.

    SciTech Connect (OSTI)

    Scheibe, Timothy D.; Johnson, Gary E.; Perkins, Bill

    1997-05-01

    The goal of this project was to help develop technology and a unified structure to access and disseminate information related to the Bonneville Power Administration's fish and wildlife responsibility in the Pacific Northwest. BPA desires to increase access to, and exchange of, information produced by the Environment Fish, and Wildlife Group in concert with regional partners. Historically, data and information have been managed through numerous centralized, controlled information systems. Fisheries information has been fragmented and not widely exchanged. Where exchange has occurred, it often is not timely enough to allow resource managers to effectively use the information to guide planning and decision making. This project (and related projects) have successfully developed and piloted a network-based infrastructure that will serve as a vehicle to transparently connect existing information systems in a manner that makes information exchange efficient and inexpensive. This project was designed to provide a mechanism to help BPA address measures in the Northwest Power Planning Council's (NPPC) Fish and Wildlife program: 3.2H Disseminate Research and Monitoring Information and 5.1A.5 manage water supplies in accordance with the Annual Implementation Work Plan. This project also provided resources that can be used to assist monitoring and evaluation of the Program.

  4. DOE - Office of Legacy Management -- Dow-Detroit Edison Project - MI 0-02

    Office of Legacy Management (LM)

    Dow-Detroit Edison Project - MI 0-02 FUSRAP Considered Sites Site: Dow-Detroit Edison Project (MI.0-02 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Detroit , Michigan MI.0-02-1 Evaluation Year: 1987 MI.0-02-1 Site Operations: Performed reference design work for a special fast breeder type reactor. MI.0-02-1 Site Disposition: Eliminated - No radioactive material handled at the site MI.0-02-1 Radioactive Materials Handled: No

  5. 1994 Annual wildlife survey report. Natural Resource Protection and Compliance Program

    SciTech Connect (OSTI)

    1995-04-24

    This report summarizes the results of wildlife surveys and other wildlife monitoring performed from January through December 1994. These surveys are part of a long-term ecological monitoring program conducted under the Natural Resource Protection and Compliance Program (NRPCP). This program is essential in identifying and quantifying fluctuations of wildlife populations, wildlife habitat use, and changes in the species using the Rocky Flats Environmental Technology Site (Site) as year-round or seasonal habitat. Wildlife population densities vary constantly due to natural pressures, and only well-integrated, long-term monitoring can identify which factors influencing wildlife populations are a consequence of natural causes, and which are due to human activities. An integrated monitoring program that gathers data on ecologically interactive species is essential in evaluating population fluctuations. Such data can be an invaluable tool in predicting and avoiding impacts on the ecology of an area due to projected human activities. With 167 species of birds, three big game species, nine species of carnivores, nine species of mid-sized mammals, and 15 small mammal species, the Site provides habitat to a surprising variety of wildlife. Many of these species are sensitive species or indicator organisms that by their presence or, more significantly, by their absence can indicate the ecological health of an area. Their presence at the Site indicates a very healthy ecosystem.

  6. Craig-Bonanza 345-kV Transmission Line Project: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The Department of Energy (DOE), and the Western Area Power Administration (Western) proposes to construct and maintain a 345- kilovolt (kV) transmission line between Craig, Colorado, and Bonanza in eastern Utah. The project began in 1986 and construction is scheduled to be completed in 1989. The project, known as the Craig-Bonanza 345-kV Transmission Line Project (Project), will be located in Moffat and Rio Blanco counties in Colorado and Uintah County in Utah. Western has the lead role for project development and management, including environmental studies and construction. Cooperating federal agencies include the Bureau of Land Management (BLM), Rural Electrification Administration, US Fish and Wildlife Service, and Bureau of Indian Affairs. This environmental assessment was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ), the DOE and the BLM. 360 refs., 33 figs., 21 tabs.

  7. EP&R Standards Project Report: Technical Review of National Incident Management Standards

    SciTech Connect (OSTI)

    Stenner, Robert D.

    2007-04-24

    The importance and necessity for a fully developed and implemented National Incident Management System (NIMS) has been demonstrated in recent years by the impact of national events such as Hurricane Katrina in 2005. Throughout the history of emergency response to major disasters, especially when multiple response organizations are involved, there have been systemic problems in the consistency and uniformity of response operations. Identifying national standards that support the development and implementation of NIMS is key to helping solve these systemic problems. The NIMS seeks to provide uniformity and consistency for incident management by using common terminology and protocols that will enable responders to coordinate their efforts to ensure an efficient response.

  8. Custom Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Management Small Industrial Lighting Compressed Air ESUE Motors Federal Agriculture Custom Projects No two industrial customers are alike; each has its own unique...

  9. Fernald Environmental Management Project Director's Final Findings & Orders, December 27, 1994 Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CERCLA Scope Summary Establish guidelines and deadlines for neutralization/removal of the hazardous waste in the uranyl nitrate hexahydrate (UNH) System Parties DOE; Fernald Environmental Restoration Management Corporation (FERMCO); Ohio Environmental Protection Agency Date 12/27/1994 SCOPE * Establish guidelines and deadlines for neutralization/removal of the hazardous waste in the uranyl nitrate hexahydrate (UNH) System. ESTABLISHING MILESTONES * Deadlines for completing certain activities

  10. Fernald Environmental Management Project Director's Final Findings & Orders, June 6, 1996 Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RCRA/CERCLA Scope Summary Integrate the Ohio EPA RCRA hazardous waste closure requirements into the remediation requirements of CERCLA Parties DOE; Fernald Environmental Restoration Management Corporation (FERMCO); Ohio Environmental Protection Agency Date 6/6/1996 SCOPE * Avoid duplication of efforts at the Facility and integrate the Ohio EPA RCRA hazardous waste closure requirements into the remediation requirements of CERCLA as detailed in the June 29, 1990 Consent Agreement as amended

  11. Fernald Environmental Management Project Director's Final Findings & Orders, September 10, 1993 Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9/10/1993 State Ohio Agreement Type Compliance Order Legal Driver(s) CERCLA Scope Summary Integrate the groundwater monitoring activities required by OAC rules with the site-wide RI/FS groundwater characterization Parties DOE; Fernald Environmental Restoration Management Corporation (FERMCO); Ohio Environmental Protection Agency Date 9/10/1993 SCOPE * Avoid duplication and integrate the groundwater monitoring activities required by OAC rules with the site-wide RI/FS groundwater characterization.

  12. Acquisition and Project Management Office volunteers get up-close look at

    National Nuclear Security Administration (NNSA)

    Office of Secure Transportation exercise | National Nuclear Security Administration Office volunteers get up-close look at Office of Secure Transportation exercise | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our

  13. River Protection Project Integrated safety management system phase II verification report, volumes I and II - 8/19/99

    SciTech Connect (OSTI)

    SHOOP, D.S.

    1999-09-10

    The Department of Energy policy (DOE P 450.4) is that safety is integrated into all aspects of the management and operations of its facilities. In simple and straightforward terms, the Department will ''Do work safely.'' The purpose of this River Protection Project (RPP) Integrated Safety Management System (ISMS) Phase II Verification was to determine whether ISMS programs and processes are implemented within RFP to accomplish the goal of ''Do work safely.'' The goal of an implemented ISMS is to have a single integrated system that includes Environment, Safety, and Health (ES&H) requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and federal property over the RPP life cycle. The ISMS is comprised of the (1) described functions, components, processes, and interfaces (system map or blueprint) and (2) personnel who are executing those assigned roles and responsibilities to manage and control the ISMS. Therefore, this review evaluated both the ''paper'' and ''people'' aspects of the ISMS to ensure that the system is implemented within RPP. Richland Operations Office (RL) conducted an ISMS Phase I Verification of the TWRS from September 28-October 9, 1998. The resulting verification report recommended that TWRS-RL and the contractor proceed with Phase II of ISMS verification given that the concerns identified from the Phase I verification review are incorporated into the Phase II implementation plan.

  14. Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-39)

    SciTech Connect (OSTI)

    N /A

    2004-02-02

    BPA funds the Albeni Falls Wildlife Mitigation Program, which is tasked with the acquisition and restoration of key habitats within the Pend Oreille Watershed. This mitigation program purchases private land to be owned and managed by program participants for the protection, mitigation, and enhancement of wildlife affected by the construction and operation of the Federal hydroelectric facilities on the Columbia River. BPA is currently working with the Kalispel Tribe of Indians to acquire and manage three parcels that total approximately 890 acres of land within Pend Oreille County, Washington. The properties proposed for acquisition contain habitats or potential habitats that will provide BPA with credits for partial mitigation of wildlife habitat losses due to the construction of Albeni Falls Dam. The current proposal includes only the fee title acquisition of these parcels; habitat enhancement activities will likely be carried out by the Kalispel Tribe of Indians in the future following the development of a management plan(s) for the lands.

  15. DOE - Office of Legacy Management -- Dayton Project Units 3 and 4 - OH 07

    Office of Legacy Management (LM)

    Units 3 and 4 - OH 07 FUSRAP Considered Sites Site: Dayton Project Units 3 & 4 (OH.07 ) U.S. Army Corps of Engineers (FUSRAP) - No Further Action Designated Name: Not Designated Alternate Name: Monsanto Units III and IV Unit III - Board of Education Maintenance Facility Unit IV - Runnymede Playhouse OH.07-1 OH.07-2 OH.07-3 Location: Unit III - 1601 W. First Street Unit IV - Runnymede Road and Dixon Avenue , Dayton , Ohio OH.07-4 OH.07-5 Evaluation Year: 1987 Site Operations: October 1943 to

  16. TRANSFORMING THE SRS ENVIRONMENTAL BUSINESS: COMMUNICATION AND APPLIED PROJECT MANAGEMENT PRINCIPLES

    SciTech Connect (OSTI)

    Saldivar, E.

    2010-01-20

    A process for communicating information relating to core business functions that also encourages improving internal communications has been established at SRS. This process continues to grow and strengthen as the multiple Contractors, Regulators and DOE-SR relationships mature. A number of management communication tools have been initiated, retooled, rebooted or continued with enhancements to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. The types of information that are the focus of this improved process are feedback from the customer and from informational exchange forums (i.e., Challenge Opportunity and Resolution (COR), SRS Regulatory Integration Team (SRIT), Environmental Quality Management Division (EQMD), Senior Environmental Managers Council (SEMC), etc.). These forums, SRS environmental functions centralization, and the creation of a Regulatory Integration process allows for cross-functional decision making, problem solving and information sharing that involves the field organizations, Environmental Compliance Authorities (ECA), Subject Matter Experts (SME), DOE and the Regulators. Numerous examples of effective decision-making and problem solving will be shared. Lessons Learned involving inadequate communications and the resulting impacts on the environment, customer satisfaction, and relationships will also be discussed. Additionally, the focus on improved communications also includes maintaining awareness of business activities. The tools being utilized to facilitate the continuing improvement of internal communications include weekly staff meetings for all individuals within the organization, quarterly ECA and SME meeting, quarterly Regulatory Integration & Environmental Services (RI&ES) All-Hands meetings hosted by the Director, bi-weekly EQMD and EQMD Lite meetings with the customer, bi-annual SRIT meetings, and COR meetings on an as need basis. In addition, an existing Required Reading Program is being formally utilized in RI&ES to ensure all individuals get formal notification of new/revised business documents. In all cases, the development of environmental communication topics that occur at SRS have a cost-scope-schedule basis that can be linked to delivery of environmental services.

  17. QER- Comment of National Wildlife Foundation

    Broader source: Energy.gov [DOE]

    Mollie Simon Climate and Energy National Wildlife Federation - National Advocacy Center 901 E. Street, NW Suite 400 Washington, DC 20004 +1 202.797.6651

  18. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Technical Baseline Development and Control Examples Example 40 5.0 PROJECT MANAGEMENT AND CONTROL The Project Management and Control section provides an overview of the project management and control systems that will be used to manage the 324/327 Buildings Stabilization/Deactivation Project, addressing the following key elements of project management and control:  Project Management Control System (PMCS) - Work breakdown structure - Baseline development/update - Scheduling - Performance

  19. management

    National Nuclear Security Administration (NNSA)

    5%2A en Management and Budget http:www.nnsa.energy.govaboutusouroperationsmanagementandbudget

  20. NNSA Procurement Projects Perspective - Bob Raines, Associate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Perspective - Bob Raines, Associate Administrator for Acquisition and Project Management, NNSA NNSA Procurement Projects Perspective - Bob Raines, Associate Administrator...