Powered by Deep Web Technologies
Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Wholesale marginal prices in competitive generation markets  

SciTech Connect (OSTI)

Wholesale marginal electricity prices are being used in several actual competitive generation markets worldwide, both to remunerate generators and to charge consumption. These prices must account not only for energy, but also for guarantee of supply in the long and the short term. This paper: (a) provides a sound conceptual and quantitative foundation for wholesale pricing based on generation services, where any existing restrictions in operation or planning in real power markets are accounted for, (b) clearly establishes the relationship between short term marginal costs, long term marginal costs and optimal wholesale electricity prices, and (c) identifies the reasons for mismatches in cost recovery with marginal generation prices. The theoretical results are verified with a detailed realistic power system model.

Perez-Arriaga, I.J. [National Electric Regulatory Commission, Madrid (Spain)] [National Electric Regulatory Commission, Madrid (Spain); Meseguer, C. [Univ. Pontificia Comillas, Madrid (Spain). Inst. de Investigacion Tecnologica] [Univ. Pontificia Comillas, Madrid (Spain). Inst. de Investigacion Tecnologica

1997-05-01T23:59:59.000Z

2

Scenario Generation for Price Forecasting in Restructured Wholesale Power Markets  

E-Print Network [OSTI]

1 Scenario Generation for Price Forecasting in Restructured Wholesale Power Markets Qun Zhou--In current restructured wholesale power markets, the short length of time series for prices makes are fitted between D&O and wholesale power prices in order to obtain price scenarios for a specified time

Tesfatsion, Leigh

3

Retrospective modeling of the merit-order effect on wholesale electricity prices from distributed photovoltaic generation in the  

E-Print Network [OSTI]

Retrospective modeling of the merit-order effect on wholesale electricity prices from distributed, the depression in wholesale prices has significant value. c 5 GW of solar generation would have saved $1.8 billion in the market over two years. c The depression of wholesale prices offsets the cost of support

Sandiford, Mike

4

Evolution of Wholesale Electricity Market Design with Increasing Levels of Renewable Generation  

SciTech Connect (OSTI)

Variable generation such as wind and photovoltaic solar power has increased substantially in recent years. Variable generation has unique characteristics compared to the traditional technologies that supply energy in the wholesale electricity markets. These characteristics create unique challenges in planning and operating the power system, and they can also influence the performance and outcomes from electricity markets. This report focuses on two particular issues related to market design: revenue sufficiency for long-term reliability and incentivizing flexibility in short-term operations. The report provides an overview of current design and some designs that have been proposed by industry or researchers.

Ela, E.; Milligan, M.; Bloom, A.; Botterud, A.; Townsend, A.; Levin, T.

2014-09-01T23:59:59.000Z

5

Exemption from Wholesale Energy Transaction Tax (Montana)  

Broader source: Energy.gov [DOE]

Electricity from wind generation on state lands is exempt from the wholesale energy transaction tax of $0.00015/kWh transmitted. Electricity from any source, including renewables, that is generated...

6

REVIEW OF MAE RULES FOR THE BRAZILIAN WHOLESALE ELECTRICITY MARKET  

E-Print Network [OSTI]

REVIEW OF MAE RULES FOR THE BRAZILIAN WHOLESALE ELECTRICITY MARKET Prepared by Shmuel S. Oren, Ph MAE rules for the Brazilian wholesale electricity market as described in the document distributed and calculation of capacity payments to generators, which are augmented on a prorata basis to the wholesale

Oren, Shmuel S.

7

File:07FDDExemptWholesaleGeneratorStatusProcess.pdf | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdfInformationInformation

8

Status of dynamical ensemble generation  

E-Print Network [OSTI]

I give an overview of current and future plans of dynamical QCD ensemble generation activities. A comparison of simulation cost between different discretizations is made. Recent developments in techniques and algorithms used in QCD dynamical simulations, especially mass reweighting, are also discussed.

Chulwoo Jung

2010-01-06T23:59:59.000Z

9

FirstChoice Wholesale Investments  

E-Print Network [OSTI]

FirstChoice Wholesale Investments Product Disclosure Statement Including FirstRate Wholesale Saver Colonial First State 1 2 Benefits of investing in FirstChoice Wholesale Investments 1 3 How FirstChoice Wholesale Investments works 2 4 Risks of investing 2 5 Fees and other costs 6 6 How managed investment

Peters, Richard

10

April 24, 2001 To all retail Providers/Wholesalers/Power Pools  

E-Print Network [OSTI]

April 24, 2001 To all retail Providers/Wholesalers/Power Pools: This letter is to alert you a tradable certificates program for use by generators, pools/wholesalers and retail providers for supporting

11

Separation and Volatility of Locational Marginal Prices in Restructured Wholesale Power Markets  

E-Print Network [OSTI]

1 Separation and Volatility of Locational Marginal Prices in Restructured Wholesale Power Markets (LMPs) in an ISO-managed restructured wholesale power market operating over an AC transmission grid-determining) generation companies induce correlations among neighboring LMPs. Index Terms--Restructured wholesale power

Tesfatsion, Leigh

12

Capacity Withholding in Restructured Wholesale Power Markets: An Agent-Based Test Bed Study  

E-Print Network [OSTI]

1 Capacity Withholding in Restructured Wholesale Power Markets: An Agent-Based Test Bed Study test case imple- mented via the AMES Wholesale Power Market Test Bed to investigate strategic capacity withholding by generation compa- nies (GenCos) in restructured wholesale power markets under systematically

Tesfatsion, Leigh

13

Status of Segmented Element Thermoelectric Generator for Vehicle...  

Broader source: Energy.gov (indexed) [DOE]

Segmented Element Thermoelectric Generator for Vehicle Waste Heat Recovery Status of Segmented Element Thermoelectric Generator for Vehicle Waste Heat Recovery Discusses progress...

14

Measuring Market Inefficiencies in California's Restructured Wholesale Electricity Market  

E-Print Network [OSTI]

Behavior In Califor- nia's Wholesale Electricity Marketin deregu- lated wholesale electricity markets," RANDin California抯 Restructured Wholesale Electricity Market

Borenstein, Severin; Bushnell, Jim; Wolak, Frank A.

2002-01-01T23:59:59.000Z

15

Diagnosing Market Power in California's Deregulated Wholesale Electricity Market  

E-Print Network [OSTI]

in dereg- ulated wholesale electricity markets," RANDin California's Deregulated Wholesale Electricity MarketEffective competition in wholesale electricity markets is

Borenstein, Severin; Bushnell, James; Wolak, Frank

1999-01-01T23:59:59.000Z

16

Pricing trends in the US market for wholesale power  

SciTech Connect (OSTI)

Electricity markets in the United States have undergone an interesting transformation over the last several years. With the Energy Policy Act of 1992, Congress set the stage for competition in the wholesale market for electricity. No longer could one utility hold another utility hostage by denying it transmission access. Through increased choices of suppliers, purchasers of wholesale power have, in many cases, been able to lower their power costs by purchasing power on the open market, rather than purchasing power solely from an adjacent utility. Burns & McDonnell has worked with many wholesale power purchasers over recent years to evaluate the available options for lowering their power costs. In many of these evaluations, bid solicitations were conducted to identify specific wholesale power purchase options. Through these projects, Burns & McDonnell has been able to collect a substantial amount of data on the offered prices for wholesale power over the last several years. The purpose of this paper is to compare the purchase power data collected by Burns & McDonnell over the last several years in evaluating resource options for electric utilities. Reviews of this data suggest a declining pricing trend that reflects increasing levels of competition in the wholesale power market. The paper also illustrates the difficulty in constructing new generation that can produce electricity at a cost below that of the wholesale power market. Finally, the paper addresses the difference between average cost and marginal cost pricing as it relates to the cost of producing wholesale power for sale. The paper discusses the idea that some participants in the wholesale power market may actually be offering power for prices that are lower than their cost of producing electricity. The advantages and disadvantages of this pricing approach are examined.

Geschwind, D.P.; Flucke, J.M. [Burns & McDonnell, Kansas City, MO (United States)

1996-12-31T23:59:59.000Z

17

Dynamic Testing of Wholesale Power Market Designs  

E-Print Network [OSTI]

Dynamic Testing of Wholesale Power Market Designs: An Open-Source Agent-Based Framework1 Junjie Sun 颅 the Wholesale Power Market Platform (WPMP) 颅 for common adoption by all U.S. wholesale power markets. Versions development and open-source implementation (in Java) of a computational wholesale power market organized

Tesfatsion, Leigh

18

Reformulating Competition? Gasoline Content Regulation and Wholesale Gasoline Prices  

E-Print Network [OSTI]

Regulation and Arbitrage in Wholesale Gasoline Markets,Content Regulation and Wholesale Gasoline Prices JenniferCONTENT REGULATION AND WHOLESALE GASOLINE PRICES by Jennifer

Brown, Jennifer; Hastings, Justine; Mansur, Erin T.; Villas-Boas, Sofia B

2007-01-01T23:59:59.000Z

19

The Impact of Carbon Pricing on Wholesale Electricity Prices, Carbon Pass-Through Rates and Retail Electricity Tariffs in Australia.1  

E-Print Network [OSTI]

1 The Impact of Carbon Pricing on Wholesale Electricity Prices, Carbon Pass-Through Rates that the introduction of a carbon price signal will have on wholesale electricity prices, carbon-pass-through rates is used to determine optimal dispatch of generation plant and wholesale prices within the ANEM model. We

Tesfatsion, Leigh

20

Integrated Retail & Wholesale Power System Operation  

E-Print Network [OSTI]

Integrated Retail & Wholesale Power System Operation with Smart-Grid Functionality PIs: Dionysios Retail/Wholesale Power System Operation with Smart-Grid Functionality Project PIs: Dionysios Aliprantis (open-source release): AMES Wholesale Power Market Testbed (ISU) + GridLAB-D distribution platform (DOE

Tesfatsion, Leigh

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

State Electricity Regulatory Policy and Distributed Resources: Accommodating Distributed Resources in Wholesale Markets  

SciTech Connect (OSTI)

Distributed resources can provide cost-effective reliability and energy services - in many cases, obviating the need for more expensive investments in wires and central station electricity generating facilities. Given the unique features of distributed resources, the challenge facing policymakers today is how to restructure wholesale markets for electricity and related services so as to reveal the full value that distributed resources can provide to the electric power system (utility grid). This report looks at the functions that distributed resources can perform and examines the barriers to them. It then identifies a series of policy and operational approaches to promoting DR in wholesale markets. This report is one in the State Electricity Regulatory Policy and Distributed Resources series developed under contract to NREL (see Annual Technical Status Report of the Regulatory Assistance Project: September 2000-September 2001, NREL/SR-560-32733). Other titles in this series are: (1) Distributed Resource Distribution Credit Pilot Programs - Revealing the Value to Consumers and Vendors, NREL/SR-560-32499; (2) Distributed Resources and Electric System Reliability, NREL/SR-560-32498; (3) Distribution System Cost Methodologies for Distributed Generation, NREL/SR-560-32500; (4) Distribution System Cost Methodologies for Distributed Generation Appendices, NREL/SR-560-32501

Weston, F.; Harrington, C.; Moskovitz, D.; Shirley, W.; Cowart, R.; Sedano, R.

2002-10-01T23:59:59.000Z

22

Power Generation Subprogram status report, 1988-1989  

SciTech Connect (OSTI)

The status of individual contracts are described for projects within GRI's Power Generation Subprogram. The funding rationale, goals and objectives, accomplishments, and strategy are described for projects in cogeneration and power systems, prime mover and component development, and natural gas vehicles research. These project areas cut across the residential, commercial, industrial, transportation, and electric utility sectors.

Not Available

1989-09-01T23:59:59.000Z

23

Market power in the England and Wales wholesale electricity [market, 1995-2000  

E-Print Network [OSTI]

This paper shows that generators exercised increasing market power in the England and Wales wholesale electricity market in the second half of the 1990s despite declining market concentration. It examines whether this was ...

Sweeting, Andrew

2004-01-01T23:59:59.000Z

24

Market Power in the England and Wales Wholesale Electricity Market 1995-2000  

E-Print Network [OSTI]

This paper shows that generators exercised increasing market power in the England and Wales wholesale electricity market in the second half of the 1990s despite declining market concentration. It examines whether this was consistent with static, non...

Sweeting, Andrew

2006-03-14T23:59:59.000Z

25

We Can Remember It for You Wholesale: Implications of Data Remanence on the Use of RAM for True Random Number Generation on RFID Tags (RFIDSec 2009)  

E-Print Network [OSTI]

Random number generation is a fundamental security primitive for RFID devices. However, even this relatively simple requirement is beyond the capacity of today's average RFID tag. A recently proposed solution, Fingerprint Extraction and Random Number Generation in SRAM (FERNS) [14, 15], involves the use of onboard RAM as the source of "true" randomness. Unfortunately, practical considerations prevent this approach from reaching its full potential. First, this method must compete with other system functionalities for use of memory. Thus, the amount of uninitialized RAM available for utilization as a randomness generator may be severely restricted. Second, RAM is subject to data remanence; there is a time period after losing power during which stored data remains intact in memory. This means that after a portion of memory has been used for entropy collection once it will require a relatively extended period of time without power before it can be reused. In a usable RFID based security application, which require...

Saxena, Nitesh

2009-01-01T23:59:59.000Z

26

Understanding Competitive Pricing and Market Power in Wholesale Electricity Markets  

E-Print Network [OSTI]

and Market Power in Wholesale Electricity Markets SeverinM a r k e t Power i n Wholesale Electricity Markets Severinthe competitiveness of the wholesale electricity market i n

Borenstein, Severin

1999-01-01T23:59:59.000Z

27

REPORT TO CONGRESS ON COMPETITION IN WHOLESALE AND RETAIL MARKETS...  

Broader source: Energy.gov (indexed) [DOE]

REPORT TO CONGRESS ON COMPETITION IN WHOLESALE AND RETAIL MARKETS FOR ELECTRIC ENERGY REPORT TO CONGRESS ON COMPETITION IN WHOLESALE AND RETAIL MARKETS FOR ELECTRIC ENERGY The...

28

Auction Basics for Wholesale Power Markets: Objectives and Pricing Rules  

E-Print Network [OSTI]

1 Auction Basics for Wholesale Power Markets: Objectives and Pricing Rules Leigh Tesfatsion, Member to U.S. restructured wholesale power markets, i.e., centrally-administered wholesale power markets and illustrated. Complicating factors specific to wholesale power markets are clarified, and recent advances

Tesfatsion, Leigh

29

Wholesale Electricity Price Forecast This appendix describes the wholesale electricity price forecast of the Fifth Northwest Power  

E-Print Network [OSTI]

Wholesale Electricity Price Forecast This appendix describes the wholesale electricity price as traded on the wholesale, short-term (spot) market at the Mid-Columbia trading hub. This price represents noted. BASE CASE FORECAST The base case wholesale electricity price forecast uses the Council's medium

30

2012 Wholesale Power and Transmission Rate  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the meaning given such term in section 3.3.5. "COU Parties' PF Rate" means any BPA wholesale power rate for service to COUs' "general requirements" (as defined in section...

31

Open Automated Demand Response Communications in Demand Response for Wholesale Ancillary Services  

E-Print Network [OSTI]

in Demand Response for Wholesale Ancillary Services Silain Demand Response for Wholesale Ancillary Services Silasuccessfully in the wholesale non- spinning ancillary

Kiliccote, Sila

2010-01-01T23:59:59.000Z

32

An Empirical Investigation of the Welfare Effects of Banning Wholesale Price Discrimination  

E-Print Network [OSTI]

legislation, which bans wholesale price discrimination, in awhere manufacturers wholesale price discriminate amongNo. 92-466 (1993); for wholesale pharmaceutics see http://

Villas-Boas, Sofia B

2008-01-01T23:59:59.000Z

33

Price Responsive Demand in New York Wholesale Electricity Market using OpenADR  

E-Print Network [OSTI]

3. Price Variations of Wholesale Electricity Markets for NYC4. Price Variations of Wholesale Electricity Markets for NYCDemand in New York Wholesale Electricity Market using

Kim, Joyce Jihyun

2013-01-01T23:59:59.000Z

34

Measuring Unilateral Market Power in Wholesale Electricity Markets: The California Market 1998 - 2000  

E-Print Network [OSTI]

in California抯 Restructured Wholesale Electricity Market,擱emedies for California Wholesale Electric Markets (IssuedUnilateral Market Power in Wholesale Electricity Markets:

Wolak, Frank

2003-01-01T23:59:59.000Z

35

Student朏aculty Interaction in Research Universities: Differences by Student Gender, Race, Social Class, and First-Generation Status  

E-Print Network [OSTI]

in attrition among ?rst- generation students. College andSocial Class, and First-Generation Status Young K. Kim 苨ocial class, and ?rst-generation status. The study utilized

Kim, Young K.; Sax, Linda J.

2009-01-01T23:59:59.000Z

36

Santee-3-E Wholesale Power Rate Schedule | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Santee-3-E Wholesale Power Rate Schedule Santee-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public...

37

A Threshold Autoregressive Model for Wholesale Electricity Prices  

E-Print Network [OSTI]

A Threshold Autoregressive Model for Wholesale Electricity Prices B. Ricky Rambharat Carnegie of wholesale electricity soared to an unprecedented $7,500 per megawatt-hour (MwH) (see FERC, 1998). Models

38

Texas Wholesale Market for Christmas Trees.  

E-Print Network [OSTI]

Wholesale Market for 7 :. @EXAS A&M UNIVERSITY . TEXAS AGRICULTURAL EXPERIMENT STATION R. E. Patterson, Director, College Station, Texas trees might capture as much as one-half of the more than 2 million Texas evergreen tree market. Wl... metropolitan areas and to Fort Wortl~. The study was performed at the request of the Texas Forest Service to provide information about the feasiblity and direction of Cl~ristmas tree man- agement research. Fi~zdings A market exists in the wholesale trade...

Sorensen, H. B. (Harold B.); Smith, W. A.

1964-01-01T23:59:59.000Z

39

Financial Bilateral Contract Negotiation in Wholesale Electricity Markets  

E-Print Network [OSTI]

1 Financial Bilateral Contract Negotiation in Wholesale Electricity Markets Using Nash Bargaining and a load-serving entity in a wholesale electric power market with congestion managed by locational marginal and price biases. Index Terms--Wholesale electricity market, financial bilateral contract, negotiation

Tesfatsion, Leigh

40

Retailer-Wholesaler Response to State-Sponsored Marketing  

E-Print Network [OSTI]

Retailer-Wholesaler Response to State-Sponsored Marketing Programs: The Case of Jersey Fresh Ramu #12;Retailer-Wholesaler Response to State-Sponsored Marketing Programs: The Case of Jersey Fresh Ramu is expressed to each and every participant of the retailer and wholesaler focus group meeting and mail survey

Neimark, Alexander V.

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Coordinating a Constrained Channel with Linear Wholesale Price Contracts.  

E-Print Network [OSTI]

Coordinating a Constrained Channel with Linear Wholesale Price Contracts. Navid Sabbaghi, Yossi, there is a set of linear wholesale price contracts that coordinates the channel while allowing the supplier-supplier/one-newsvendor channel configuration (with each supplier selling a unique product). We analyze how this set of wholesale

Tsitsiklis, John

42

Safeguarding Truck-Shipped Wholesale and Retail Fuels (STSWRF)  

E-Print Network [OSTI]

Safeguarding Truck-Shipped Wholesale and Retail Fuels (STSWRF) Oak Ridge National Laboratory at the wholesaler/distributor level or below. This presents additional challenges in tracking untaxed fuel after approved ORNL's plan to conduct a Phase II Pilot Test titled Safeguarding Truck-Shipped Wholesale

43

Derivation of Locational Marginal Prices for Restructured Wholesale Power Markets  

E-Print Network [OSTI]

Derivation of Locational Marginal Prices for Restructured Wholesale Power Markets Haifeng Liu restructured wholesale power markets, the detailed derivation of LMPs as actually used in industry practice Operator (MISO). Keywords: Locational marginal pricing, wholesale power market, AC optimal power flow, DC

Tesfatsion, Leigh

44

A Study of Central Auction Based Wholesale Electricity Markets  

E-Print Network [OSTI]

A Study of Central Auction Based Wholesale Electricity Markets S. Ceppi and N. Gatti Dipartimento is the automation of such markets. In particular, we focus our attention on wholesale elec- tricity markets based works presented in the literature model wholesale markets as oligopolies, neglecting thus the specific

Gatti, Nicola

45

CSEM WP 114 Measuring Unilateral Market Power in Wholesale  

E-Print Network [OSTI]

CSEM WP 114 Measuring Unilateral Market Power in Wholesale Electricity Markets: The California, Suite 5 Berkeley, California 94720-5180 www.ucei.org #12;Measuring Unilateral Market Power in Wholesale electricity suppliers in the California had to exercise market power in the state's wholesale market during

California at Berkeley. University of

46

Dutch Wholesale Company Highway 57 North Elnora, IN 47529  

E-Print Network [OSTI]

2011 Dutch Wholesale Company Highway 57 North 路 Elnora, IN 47529 TOLL FREE: (800) 472-9178 路 FAX States only. J enclosed is a check payable to Dutch Wholesale Company J J please send payment with your! Thank You! Dutch Wholesale Company Highway 57 North Elnora, IN 47529 Phone: (800) 472-9178 Fax: (812

47

2007 Wholesale Power Rate Case Initial Proposal : Revenue Requirement Study.  

SciTech Connect (OSTI)

The purpose of this Study is to establish the level of revenues from wholesale power rates necessary to recover, in accordance with sound business principles, the Federal Columbia River Power System (FCRPS) costs associated with the production, acquisition, marketing, and conservation of electric power. The generation revenue requirement includes: recovery of the Federal investment in hydro generation, fish and wildlife and conservation costs; Federal agencies' operations and maintenance (O&M) expenses allocated to power; capitalized contract expenses associated with non-Federal power suppliers such as Energy Northwest (EN); other power purchase expenses, such as short-term power purchases; power marketing expenses; cost of transmission services necessary for the sale and delivery of FCRPS power; and all other generation-related costs incurred by the Administrator pursuant to law.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

48

Predicting market power in wholesale electricity markets  

E-Print Network [OSTI]

Predicting market power in wholesale electricity markets#3; David M Newbery Faculty of Economics, University of Cambridge August 26, 2008 Abstract The traditional measure of market power is the HHI, which gives implausible results given the low... elasticity of demand in electricity spot markets, unless it is adapted to take account of contracting. In its place the Residual Supply Index has been proposed as a more suitable index to measure potential market power in electricity markets, notably...

Newbery, David

49

Non-Utility Generation and Transmission Access in Texas  

E-Print Network [OSTI]

system is a key factor in promoting competition in power generation. With changes in the Federal law, wholesale customers and NUGs are working with state legislators and regulators to open up the transmission system for opportunities in the wholesale...

Panjavan, S.; Adib, P.

50

Feasibility of Wholesale Electricity Competition in a Developing Country: Insights from Simulating a Market in Maharashtra State, India  

E-Print Network [OSTI]

analysis indicates that wholesale competition could be oneCSEM WP 152 Feasibility of Wholesale Electricity CompetitionFeasibility of Wholesale Electricity Competition in a

Phadke, Amol

2007-01-01T23:59:59.000Z

51

Empirical Evidence on the Role of Non Linear Wholesale Pricing and Vertical Restraints on Cost Pass-Through  

E-Print Network [OSTI]

Welfare E?ects of Banning Wholesale Price Discrimination,攏on linear contracts when wholesale price discrimination ison the role of non- linear wholesale pricing and vertical

Celine, Bonnet; Dubois, Pierre; Villas-Boas, Sofia B.

2009-01-01T23:59:59.000Z

52

Customer reponse to day-ahead wholesale market electricity prices: Case study of RTP program experience in New York  

E-Print Network [OSTI]

Response to Day-ahead Wholesale Market Electricity Prices:Response to Day-ahead Wholesale Market Electricity Prices:Mitigating Price Spikes in Wholesale Markets through Market-

2004-01-01T23:59:59.000Z

53

The potential impacts of a competitive wholesale market in the midwest: A preliminary examination of centralized dispatch  

E-Print Network [OSTI]

Impacts of a Competitive Wholesale Market in the Midwest: AImpacts of a Competitive Wholesale Market in the Midwest: AImpacts of a Competitive Wholesale Market in the Midwest: A

Lesieutre, Bernard C.; Bartholomew, Emily; Eto, Joseph H.; Hale, Douglas; Luong, Thanh

2004-01-01T23:59:59.000Z

54

The Implementation of California AB 32 and its Impact on Wholesale Electricity Markets  

E-Print Network [OSTI]

AB 32 and its Impact on Wholesale Electricity Markets JamesAB 32 and its Impact on Wholesale Electricity Markets Jamesand performance of the wholesale electricity market. One key

Bushnell, Jim B

2007-01-01T23:59:59.000Z

55

Optimal Static Hedging of Volumetric Risk in a Competitive Wholesale Electricity Market  

E-Print Network [OSTI]

Optimal Static Hedging of Volumetric Risk in a Competitive Wholesale Electricity Market Yumi Oum wholesale electricity markets, regulated load serving entities (LSEs) and marketers with default service their obligation through combinations of long-term contracts, wholesale purchases and self

56

Status of the plasma generator of the superconducting proton linac  

SciTech Connect (OSTI)

In the framework of the superconducting proton linac (SPL) study at CERN, a new non-cesiated H{sup -} plasma generator driven by an external 2 MHz RF antenna has been developed and successfully operated at repetition rates of 50 Hz, pulse lengths of up to 3 ms, and average RF powers of up to 3 kW. The coupling efficiency of RF power into the plasma was determined by the cooling water temperatures and the analysis of the RF forward and reflected power and the antenna current and amounts to 50%-60%. The plasma resistance increases between 10 kW and 40 kW RF power from about 0.45 {Omega} to 0.65 {Omega}. Measurements of RF power dissipated in the ferrites and the magnets on a test bench show a 5-fold decrease of the power losses for the magnets when they are contained in a Cu box, thus validating the strategy of shielding the magnets with a high electrical conductivity material. An air cooling system was installed in the SPL plasma generator to control the temperatures of the ferrites despite hysteresis losses of several Watts.

Kronberger, M.; Lettry, J.; Paoluzzi, M.; Pereira, H.; Arias, J. Sanchez; Schmitzer, C.; Scrivens, R. [European Organisation for Nuclear Research, CERN, 1211 Geneva 23 (Switzerland); Faircloth, D. [STFC, Rutherford Appleton Laboratory, Chilton, Oxon OX11 0QX (United Kingdom)

2012-02-15T23:59:59.000Z

57

Countervailing Power in Wholesale Pharmaceuticals Sara Fisher Ellison Christopher M. Snyder  

E-Print Network [OSTI]

Countervailing Power in Wholesale Pharmaceuticals Sara Fisher Ellison Christopher M. Snyder M liter- ature. We test the theories using data on wholesale prices for antibiotics sold to large

Lotko, William

58

The Implementation of California AB 32 and its Impact on Wholesale Electricity Markets  

E-Print Network [OSTI]

its Impact on Wholesale Electricity Markets James Bushnellits Impact on Wholesale Electricity Markets James Bushnell *gas emissions from electricity and perhaps other industries.

Bushnell, Jim B

2007-01-01T23:59:59.000Z

59

A Quantitative Analysis of Pricing Behavior In California's Wholesale Electricity Market During Summer 2000  

E-Print Network [OSTI]

A Quantitative Analysis of Pricing Behavior In California's Wholesale Electricity Market During Summer 2000...

Joskow, Paul; Kahn, Edward

2004-06-16T23:59:59.000Z

60

Fiber to the Premise (FTTP) Industry Structure: Implications of a Wholesale-Retail Split  

E-Print Network [OSTI]

Fiber to the Premise (FTTP) Industry Structure: Implications of a Wholesale-Retail Split Anupam. In other cases, either out of choice or regulation, we observe the network owner (the wholesaler) leasing the shared network (wholesale-retail split). The network owner can either wholesale dark fiber or "lit

Sirbu, Marvin

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Company Name: C&S Wholesale Grocers Web Site: http://weselectthebest.com/  

E-Print Network [OSTI]

Company Name: C&S Wholesale Grocers Web Site: http://weselectthebest.com/ Industry: Wholesale and rewarding. New England-based C&S Wholesale Grocers is the leading supply chain company in the food industry. It is the largest wholesale grocery supplier in the U.S and the 9th-largest privately held company in the nation

New Hampshire, University of

62

An Agent-Based Computational Laboratory for Wholesale Power Market Design  

E-Print Network [OSTI]

1 An Agent-Based Computational Laboratory for Wholesale Power Market Design Junjie Sun and Leigh (in Java) of an agent-based compu- tational wholesale power market organized in accordance with core the Wholesale Power Market Platform (WPMP) as a template for all U.S. wholesale power markets (FERC [1

Tesfatsion, Leigh

63

Impact on retail prices of non-neutral wholesale prices for content providers  

E-Print Network [OSTI]

Impact on retail prices of non-neutral wholesale prices for content providers Giuseppe D Atlantique Rennes, France Email: bruno.tuffin@irisa.fr Abstract--The impact of wholesale prices is examined equal wholesale prices to the two content providers), the benefits coming from wholesale price

Paris-Sud XI, Universit茅 de

64

Trends in demand for retail and wholesale cuts of meat  

E-Print Network [OSTI]

TRENDS IN DEMAND FOR RETAIL AND WHOLESALE CUTS OF MEAT A Thesis by DAVID WAYNE HOLLOWAY Submitted to the Office of Graduate Studies of Texas ARM University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... December 1990 Major Subject: Agricultural Economics TRENDS IN DEMAND FOR RETAIL AND WHOLESALE CUTS OF MEAT A Thesis by DAVID WAYNE HOLLOWAY Approved as to style and content by: Donald E. Farris (Chair of Committee) Carl E. Shafer (Member) Rudo J...

Holloway, David Wayne

1990-01-01T23:59:59.000Z

65

Paying for demand-side response at the wholesale level  

SciTech Connect (OSTI)

The recent FERC Notice of Public Rulemaking regarding the payment to demand-side resources in wholesale markets has engendered a great deal of comments including FERC's obligation to ensure just and reasonable rates in the wholesale market and criteria for what FERC should do (on grounds of economic efficiency) without any real focus on what that commitment would really mean if FERC actually pursued it. (author)

Falk, Jonathan

2010-11-15T23:59:59.000Z

66

Marketing Practices and Costs of Texas Egg Producer-Wholesalers.  

E-Print Network [OSTI]

the ungraded, loose desirable in order to take advantage of both labor wholesale alternative and the gra(lPr,, specialization in egg processing and market out- lets which require large volumes. Producers cartoned retailer-consumer alternative. Groupretail A, B and C's presence in the market may be outlets at wholesale prices and/or directly to explained in part by their accepting low returnc for their labor and investment and/or the receipt consumers at prices...

Shafer, Carl E.

1964-01-01T23:59:59.000Z

67

The efficiency of wholesale vs. retail competition in electricity  

SciTech Connect (OSTI)

If markets are sufficiently competitive, the retail model of restructuring is likely to produce a greater array of products and services and lower electricity prices, but the wholesale model may yield lower transaction costs and better encourage transmission investment. Which model is best? The answer is not known yet. A central issue in the debate over restructuring the electric power industry is the extent to which the market should be opened to competition. One aspect of this debate is whether competition ought to be restricted to the wholesale power market or extended all the way to retail customers. Some state regulators have recommended retail competition, while others, including the U.S. Department of Energy, prefer to limit competition to the wholesale level, at least until experience warrants taking the additional step. The purpose of this paper is to describe some of the potential differences in economic efficiency that could arise between the wholesale and retail competition models. The comparison is limited to the qualitative properties of two hypothetical market structures that are intended to reflect the essential differences between wholesale and retail competition. The authors are not concerned with problems of getting from today`s market structure to either end state.

Bohi, D.R.; Palmer, K. [Resources for the Future, Washington, DC (United States)] [Resources for the Future, Washington, DC (United States)

1996-10-01T23:59:59.000Z

68

2007 Wholesale Power Rate Case Final Proposal : Wholesale Power Rate Development Study.  

SciTech Connect (OSTI)

The Wholesale Power Rate Development Study (WPRDS) serves two primary purposes. It synthesizes information supplied by the other final studies that comprise the BPA rate proposal and shows the actual calculations for BPA's power rates. In addition, the WPRDS is the primary source for certain information used in establishing the power rates. Information developed in the WPRDS includes rate design (including seasonal and diurnal shapes for energy rates, demand, and load variance rates), the risk mitigation tools (Cost Recovery Adjustment Clause (CRAC), along with the [N]ational Marine Fisheries Service [F]ederal Columbia River Power System [B]iological Opinion (NFB) Adjustment, the Emergency NFB Surcharge, and Dividend Distribution Clause (DDC)), development of the Slice rate, and all discounts and other adjustments that are included in the rate schedules and the General Rate Schedule Provisions. The WPRDS also includes the description of the methodology for the Cost of Service Analysis (COSA), and the various rate design steps necessary to establish BPA's power rates. The WPRDS also shows the calculations for inter-business line revenues and expenses, the revenue forecast and, finally, includes a description of all of the rate schedules. The actual rate schedules are shown in ''Administrator's Final Record of Decision (ROD), Appendix A: 2007 Wholesale Power Rate Schedules and General Rate Schedule Provisions, WP-07-A-02''. The WPRDS also includes the Partial Resolution of Issues, shown in Attachment 1 of the ROD. The Partial Resolution of Issues affected many of the features described in this study. These are noted where appropriate.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

69

Using Laboratory Experiments to Design Efficient Market Institutions The case of wholesale electricity markets  

E-Print Network [OSTI]

1 Using Laboratory Experiments to Design Efficient Market Institutions The case of wholesale is dedicated to wholesale markets, and reviews the results accumulated to date concerning both the general

Paris-Sud XI, Universit茅 de

70

Electricity prices in a competitive environment: Marginal cost pricing of generation services and financial status of electric utilities. A preliminary analysis through 2015  

SciTech Connect (OSTI)

The emergence of competitive markets for electricity generation services is changing the way that electricity is and will be priced in the United States. This report presents the results of an analysis that focuses on two questions: (1) How are prices for competitive generation services likely to differ from regulated prices if competitive prices are based on marginal costs rather than regulated {open_quotes}cost-of-service{close_quotes} pricing? (2) What impacts will the competitive pricing of generation services (based on marginal costs) have on electricity consumption patterns, production costs, and the financial integrity patterns, production costs, and the financial integrity of electricity suppliers? This study is not intended to be a cost-benefit analysis of wholesale or retail competition, nor does this report include an analysis of the macroeconomic impacts of competitive electricity prices.

NONE

1997-08-01T23:59:59.000Z

71

Fulton Fish Market: Wholesale Prices for Clams 2003 Aquaculture Survey 1  

E-Print Network [OSTI]

Fulton Fish Market: Wholesale Prices for Clams 2003 Aquaculture Survey 1 Fulton Fish Market Prices or by accessing www.nass.usda.gov/fl. The wholesale selling prices listed by the New York Fulton Fish Market are for a 400-count bag. The average wholesale price for a Florida clam has dropped from 22.8 to 15.7 cents

Florida, University of

72

Financial Risk Management in Restructured Wholesale Power Markets: Concepts and Tools  

E-Print Network [OSTI]

1 Financial Risk Management in Restructured Wholesale Power Markets: Concepts and Tools Nanpeng Yu by explaining and illustrating basic financial risk management concepts relevant for wholesale power markets--Financial Risk Management, Restructured Wholesale Power Markets, Agent-Based Test Bed I. INTRODUCTION

Tesfatsion, Leigh

73

The AMES Wholesale Power Market Test Bed as a Stochastic Dynamic State-Space Game  

E-Print Network [OSTI]

The AMES Wholesale Power Market Test Bed as a Stochastic Dynamic State-Space Game Leigh Tesfatsion.econ.iastate.edu/tesfatsi/ tesfatsi@iastate.edu Last Revised: August 5, 2008 Abstract: The AMES Wholesale Power Market Test Bed wholesale power markets. These notes show how AMES can be recast in more standard state-space equation form

Tesfatsion, Leigh

74

See More Jobs From Agrium Wholesale Truck Analyst (175535-001) -(Calgary, Alberta, Western Canada, Canada)  

E-Print Network [OSTI]

See More Jobs From Agrium Wholesale Truck Analyst (175535-001) - (Calgary, Alberta, Western Canada, Canada) Company: Agrium Wholesale Apply below Industry Sector: Agribusiness Industry Type: Agronomy a growing world. Growth is a top priority for Agrium Wholesale and it doesn't just apply to the nutrients we

Behmer, Spencer T.

75

SAMPLE INTERNSHIP DESCRIPTION NOT CURRENTLY OPEN FOR INFORMATION ONLY Online and Wholesale Internship  

E-Print Network [OSTI]

SAMPLE INTERNSHIP DESCRIPTION 颅 NOT CURRENTLY OPEN 颅 FOR INFORMATION ONLY Online and Wholesale individuals to help support the Online and Wholesale Divisions in Portland, Oregon who: 路 Have an interest, and a wholesale operation. Other Global Exchange programs include a Reality Tours travel program to both U

76

The Potential Impacts of a Competitive Wholesale Market in the Midwest: A Preliminary Examination of  

E-Print Network [OSTI]

LBNL-56503 The Potential Impacts of a Competitive Wholesale Market in the Midwest: A Preliminary-56503 The Potential Impacts of a Competitive Wholesale Market in the Midwest: A Preliminary Examination Wholesale Market in the Midwest: A Preliminary Examination of Centralized Dispatch ii Acknowledgements

77

Integrated Retail and Wholesale Power System Operation with Smart-Grid Functionality  

E-Print Network [OSTI]

1 Integrated Retail and Wholesale Power System Operation with Smart-Grid Functionality Dionysios of retail and wholesale power markets operating over transmission and distribution networks with smart-grid functionality. This test bed seams together two existing test beds, the AMES Wholesale Power Market Test Bed

Tesfatsion, Leigh

78

Eric S. Schubert is a Senior Market Economist at the Wholesale Market Oversight of the Public  

E-Print Network [OSTI]

Eric S. Schubert is a Senior Market Economist at the Wholesale Market Oversight of the Public Utility Commission of Texas in Austin with expertise on wholesale market design and resource adequacy from the University of Illinois at Urbana-Champaign. David Hurlbut is Senior Economist at the Wholesale

Oren, Shmuel S.

79

Effects of Price-Responsive Residential Demand on Retail and Wholesale Power Market Operations  

E-Print Network [OSTI]

1 Effects of Price-Responsive Residential Demand on Retail and Wholesale Power Market Operations/C) on integrated retail and wholesale power market operations. The physical operations of the A/C sys- tem at wholesale conditional on A/C load, and the retail energy prices offered to residential A/C consumers

Tesfatsion, Leigh

80

The AMES Wholesale Power Market Test Bed: A Computational Laboratory for  

E-Print Network [OSTI]

1 The AMES Wholesale Power Market Test Bed: A Computational Laboratory for Research, Teaching, and Training Hongyan Li, Student Member, IEEE, and Leigh Tesfatsion, Member, IEEE Abstract--Wholesale power suitable for the objective study of this restructuring process. This study reports on the AMES Wholesale

Tesfatsion, Leigh

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

An Agent-Based Test Bed Study of Wholesale Power Market Performance Measures  

E-Print Network [OSTI]

1 An Agent-Based Test Bed Study of Wholesale Power Market Performance Measures Abhishek Somani and Leigh Tesfatsion, Member, IEEE Abstract--Wholesale power markets operating over trans- mission grids and operational inefficiency. This study uses a wholesale power market test bed with strategically learning

Tesfatsion, Leigh

82

Integrated Retail and Wholesale (IRW) Power System Operations with Smart-Grid Functionality  

E-Print Network [OSTI]

Integrated Retail and Wholesale (IRW) Power System Operations with Smart-Grid Functionality Leigh of the Integrated Retail/Wholesale (IRW) project at Iowa State University 路 IRW Test Bed development 路 Integration-NE, MISO, XM, RTE, MEC IRW Project: Integrated Retail/Wholesale Power System Operation with Smart

Tesfatsion, Leigh

83

EIS-0102: Bonneville Power Administration's 1983 Wholesale Power Rate  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration prepared this EIS to evaluate the potential environmental impacts associated with an increase in wholesale power rates that would become effective on November 1, 1983, including the effects of rate hikes in that year and the cumulative effects of previous rate hikes.

84

Supreme court agrees: FERC must regulate wholesale markets  

SciTech Connect (OSTI)

The author believes that wholesale markets in the United States would have a greater likelihood of ultimately benefiting consumers if the Federal Energy Regulatory Commission did not have the mandate under the Federal Power Act (FPA) to ensure that wholesale prices are ''just and reasonable.'' However, he continues to believe that the FERC cannot avoid having an ex post criteria for asssessing whether market prices are just and reasonable. Moreover, changes in the design and regulatory oversight of U.S. wholesale electricity markets in recent years, including the recent Supreme Court decision, have caused him to believe even more strongly in the guardrails-for-market-outcomes approach. Finally, several questions are addressed which relate to the pricing of fixed-price, long-term contracts and the impact of these obligations on the behavior of suppliers in short-term wholesale markets that are directly relevant to answering the two major questions that the Supreme Court remanded to FERC in its recent decision.

Wolak, Frank A. (Holbrook Working Professor of Commodity Price Studies, Department of Economics, Stanford University)

2008-08-15T23:59:59.000Z

85

Managing transmission curtailment risk in wholesale power markets  

SciTech Connect (OSTI)

Risk resulting from transmission loading relief calls made by transmission system operators can be managed with information estimated by a statistical model capable of predicting one day in advance the probability that a particular wholesale power transaction might be curtailed. The model predicts this probability with a reasonable degree of accuracy using information on variables that can be obtained publicly. (author)

Morey, Mathew J.; Kirsch, Laurence D.

2009-11-15T23:59:59.000Z

86

A Threshold Autoregressive Model for Wholesale Electricity Prices  

E-Print Network [OSTI]

A Threshold Autoregressive Model for Wholesale Electricity Prices B. Ricky Rambharat, Department, 2003 Abstract We introduce a discrete-time model for electricity prices, which accounts for both spikes Introduction The study of electricity price dynamics has attracted significant attention from researchers

87

2007 Wholesale Power Rate Case Initial Proposal : Wholesale Power Rate Development Study Documentation.  

SciTech Connect (OSTI)

The Documentation for Wholesale Power Rate Development Study (WPRDS) shows the details of the calculation of the proposed rates. It contains the source data, the calculation, and the results. Section 1 contains an overview of the information used and developed in the various models used in the rate development process. Section 2 contains the documentation of the Rate Analysis Model (RAM2007). The RAM2007 is a group of computer applications that performs most of the computations that determine BPA's proposed rates. The output tables of RAM2007 show the source data, calculations (in sequence), and the results (rate charges) of the rate development process. Section 3 provides documentation of revenue forecasts for the 3-year rate test period FY 2007 through FY 2009 at both current and proposed rates and at current rates for the period immediately preceding the rate test period. Section 4 includes supporting data for rate calculations not performed in RAM2007 or revenue analyses. Each section draws data from difference sources and thus tables and/or charts are not always numbered in sequence. For purposes of this document, omitted tables will be listed as such in the Table of Contents.

United States. Bonneville Power Administration

2005-11-01T23:59:59.000Z

88

2007 Wholesale Power Rate Case Final Proposal : Wholesale Power Rate Development Study Documentation, Volume 2.  

SciTech Connect (OSTI)

The Documentation for Wholesale Power Rate Development Study shows the details of the calculation of the proposed rates. It contains the source data, the calculation, and the results. There are 2 Volumes, the first containing Sections 1, 2, and 3; the second containing Section 4 and 3 appendices. Section 1 contains an overview of the information used and developed in the various models used in the rate development process. Section 2 contains the documentation of the Rate Analysis Model (RAM2007). The RAM2007 is a group of computer applications that performs most of the computations that determine BPA's proposed rates. The output tables of RAM2007 show the source data, calculations (in sequence), and the results (rate charges) of the rate development process. Section 3 provides documentation of revenue forecasts for the three-year rate test period FY 2007 through FY 2009 at both current and proposed rates and at current rates for the period immediately preceding the rate test period. Section 4 includes supporting data for rate calculations not performed in RAM2007 or revenue analyses.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

89

2007 Wholesale Power Rate Case Initial Proposal : Wholesale Power Rate Development Study.  

SciTech Connect (OSTI)

The Wholesale Power Rate Development Study (WPRDS) calculates BPA proposed rates based on information either developed in the WPRDS or supplied by the other studies that comprise the BPA rate proposal. All of these studies, and accompanying documentation, provide the details of computations and assumptions. In general, information about loads and resources is provided by the Load Resource Study (LRS), WP-07-E-BPA-01, and the LRS Documentation, WP-07-E-BPA-01A. Revenue requirements information, as well as the Planned Net Revenues for Risk (PNNR), is provided in the Revenue Requirement Study, WP-07-E-BPA-02, and its accompanying Revenue Requirement Study Documentation, WP-07-E-BPA-02A and WP-07-E-BPA-02B. The Market Price Forecast Study (MPFS), WP-07-E-BPA-03, and the MPFS Documentation, WP-07-E-BPA-03A, provide the WPRDS with information regarding seasonal and diurnal differentiation of energy rates, as well information regarding monthly market prices for Demand Rates. In addition, this study provides information for the pricing of unbundled power products. The Risk Analysis Study, WP-07-E-BPA-04, and the Risk Analysis Study Documentation, WP-07-E-BPA-04A, provide short-term balancing purchases as well as secondary energy sales and revenue. The Section 7(b)(2) Rate Test Study, WP-07-E-BPA-06, and the Section 7(b)(2) Rate Test Study Documentation, WP-07-E-BPA-06A, implement Section 7(b)(2) of the Northwest Power Act to ensure that BPA preference customers firm power rates applied to their general requirements are no higher than rates calculated using specific assumptions in the Northwest Power Act.

United States. Bonneville Power Administration.

2007-11-01T23:59:59.000Z

90

The robustness of agent-based models of electricity wholesale markets  

E-Print Network [OSTI]

The robustness of agent-based models of electricity wholesale markets David Newberry May 2012 CWPE 1228 & EPRG 1213 The robustness of agent-based model of electricity wholesale markets... David Newberry May 2012 CWPE 1228 & EPRG 1213 www.eprg.group.cam.ac.uk E P R G W O R K IN G P A P E R Abstract The robustness of agent-based models of electricity wholesale markets EPRG Working Paper 1213 Cambridge...

Newberry, David

2012-05-28T23:59:59.000Z

91

Assessing the Impact of Economically Dispatchable Wind Resources on the New England Wholesale Electricity Market.  

E-Print Network [OSTI]

??Among renewable energy resources, wind power is poised to contribute most significantly to meeting future wholesale electricity demand. However, the intermittent nature of wind power (more)

Goggins, Andrew

2013-01-01T23:59:59.000Z

92

E-Print Network 3.0 - australian wholesale spot Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

retail and wholesale energy... in trading software. tradeslot is a member of the Emissions Trading Panel of the Australian government... Department of Climate Change, advising on...

93

October 2001 - September 2006 Wholesale Power Rates (rates/previous)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 The 2002 Wholesale Power Rate Schedules (base rates) for the FY

94

MISS-1-N Wholesale Power Rate Schedule | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy HealthComments MEMA: Comments Memo from OctoberMISS-1-N Wholesale Power Rate

95

A New Generation: Ethnicity, Socioeconomic Status, Immigration and the Undergraduate Experience at the University of California  

E-Print Network [OSTI]

BERKELEY A New Generation: SERU Project Report iv V . WhatA New Generation: SERU Project Report IV. How Engaged Are UC

Brint, S; Douglass, John Aubrey; Flacks, Richard; Thomson, Gregg; Chatman, Steve

2007-01-01T23:59:59.000Z

96

The role of vibrant retail electricity markets in assuring that wholesale power markets operate effectively  

SciTech Connect (OSTI)

Barriers to competitive supplier entry such as California's wholesale-price pass-through model can provide an almost insurmountable barrier to effective retail competition. The telecommunications, airline, and software industries provide lessons--positive and negative--on how creating competitive wholesale markets is insufficient to bring the benefits of competition to smaller consumers.

Goulding, A.J.; Rufin, C.; Swinand, G.

1999-12-01T23:59:59.000Z

97

2007 Wholesale Power Rate Case Initial Proposal : Direct Testimony.  

SciTech Connect (OSTI)

The purpose of our testimony is to sponsor the rate design portions of Bonneville Power Administration's (BPA) Wholesale Power Rate Development Study (WPRDS), WP-07-E-BPA-05, and associated portions of the Wholesale Power Rate Schedules and GRSPs (WP-07-E-BPA-07). Our testimony is organized in eight sections. The first section outlines the purpose of our testimony. Section 2 describes BPA's Demand Rates, including subsections on the definition of the Demand Rate, the method for computing the Demand Rates, and differences from the currently effective WP-02 Demand Rate. Section 3 describes BPA's Load Variance Rate, with subsections on the definition and purpose of the Load Variance Rate, application of the Load Variance Rate, how the Load Variance Rate is calculated, and the differences from the WP-02 Load Variance Rate. Section 4 describes the steps involved in developing BPA's energy rates and differences from the WP-02 rate case. Section 5 discusses discontinuation of the Stepped Up Multi-Year Block Rate. Section 6 describes a minor change to the Unauthorized Increase Rates and the Excess Factoring Rates. Section 7 describes the Targeted Adjustment Charge. Section 8 addresses the Operating Reserves Credit.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

98

BJ's Wholesale Club Welcomes you! Thank you for participating in our Corporate Membership program by renewing or  

E-Print Network [OSTI]

BJ's Wholesale Club Welcomes you! Thank you for participating in our Corporate Membership program by renewing or purchasing your BJ's Wholesale Club Membership. BJ's is unlike any shopping club you have ever of the negatives that wholesale shoppers have become all too familiar with. BJ's Application Form Read over

Reuter, Martin

99

An Agent-Based Test Bed for the Integrated Study of Retail and Wholesale Power System Operations  

E-Print Network [OSTI]

An Agent-Based Test Bed for the Integrated Study of Retail and Wholesale Power System Operations D study of retail and wholesale power markets operating over transmission and distribution networks with smart-grid functionality. The test bed will seam together two existing test beds, the AMES Wholesale

Tesfatsion, Leigh

100

Simulation of the Rungis Wholesale Market: lessons on the calibration, validation and usage of a Cognitive Agent-based Simulation  

E-Print Network [OSTI]

Simulation of the Rungis Wholesale Market: lessons on the calibration, validation and usage on a simulation of the Rungis Wholesale Market (in France) using cognitive agents. The implication of using of the system. Our case, the Fruits and Vegetables wholesale market of the Rungis Food Market, constitutes

Paris-Sud XI, Universit茅 de

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Impact of U.S. Wholesale Demand for Canned Sardines on Market Accessibility of Potential Gulf of Mexico Products  

E-Print Network [OSTI]

Impact of U.S. Wholesale Demand for Canned Sardines on Market Accessibility of Potential Gulf market, three product groups, which comprise the market, are analyzed at the wholesale level to detennine can to a 425 round no. 1 tall can (Lanier, 1981). In this paper we examine the U.S. wholesale demand

102

Status of Segmented Element Thermoelectric Generator for Vehicle Waste Heat Recovery  

Broader source: Energy.gov [DOE]

Discusses progress of thermoelectric generator development at BSST and assessment of potential to enter commercial operation in vehicles

103

Roadmapping the Resolution of Gas Generation Issues in Packages Containing Radioactive Waste/Materials - A Status Report  

SciTech Connect (OSTI)

Gas generation issues, particularly hydrogen, have been an area of concern for the transport and storage of radioactive materials and waste in the Department of Energy (DOE) Complex. Potentially combustible gases can be generated through a variety of reactions, including chemical reactions and radiolytic decomposition of hydrogen- containing material. Since transportation regulations prohibit shipment of explosives and radioactive materials together, it was decided that hydrogen generation was a problem that warranted the execution of a high-level roadmapping effort. This paper discusses the major gas generation issues within the DOE Complex and the research that has been and is being conducted by the transuranic (TRU) waste, nuclear materials, and spent nuclear fuels (SNF) programs within DOE抯 Environmental Management (EM) organizations to address gas generation concerns. This paper presents a "program level" roadmap that links technology development to program needs and identifies the probability of success in an effort to understand the programmatic risk associated with the issue of gas generation. This paper also presents the status of the roadmap and follow-up activities.

Luke, Dale Elden; Hamp, S.

2002-02-01T23:59:59.000Z

104

Roadmapping the Resolution of Gas Generation Issues in Packages Containing Radioactive Waste/Materials - A Status Report  

SciTech Connect (OSTI)

Gas generation issues, particularly hydrogen, have been an area of concern for the transport and storage of radioactive materials and waste in the Department of Energy (DOE) Complex. Potentially combustible gases can be generated through a variety of reactions, including chemical reactions and radiolytic decomposition of hydrogen-containing material. Since transportation regulations prohibit shipment of explosives and radioactive materials together, it was decided that hydrogen generation was a problem that warranted the execution of a high-level roadmapping effort. This paper discusses the major gas generation issues within the DOE Complex and the research that has been and is being conducted by the transuranic (TRU) waste, nuclear materials, and spent nuclear fuels (SNF) programs within DOE's Environmental Management (EM) organizations to address gas generation concerns. This paper presents a ''program level'' roadmap that links technology development to program needs and identifies the probability of success in an effort to understand the programmatic risk associated with the issue of gas generation. This paper also presents the status of the roadmap and follow-up activities.

Luke, D.E. (INEEL); Hamp, S. (DOE-Albuquerque Operations Office)

2002-01-04T23:59:59.000Z

105

Transacting generation attributes across market boundaries: Compatible information systems and the treatment of imports and exports  

E-Print Network [OSTI]

electric output of the wind generator. Combinations of theseSink (e,g, New England) Wind Generator Under this approach,New York New England Wind Generator REP Wholesale Matching.

Grace, Robert; Wiser, Ryan

2002-01-01T23:59:59.000Z

106

Technology status and project development risks of advanced coal power generation technologies in APEC developing economies  

SciTech Connect (OSTI)

The report reviews the current status of IGCC and supercritical/ultrasupercritical pulverized-coal power plants and summarizes risks associated with project development, construction and operation. The report includes an economic analysis using three case studies of Chinese projects; a supercritical PC, an ultrasupercritical PC, and an IGCC plant. The analysis discusses barriers to clean coal technologies and ways to encourage their adoption for new power plants. 25 figs., 25 tabs.

Lusica, N.; Xie, T.; Lu, T.

2008-10-15T23:59:59.000Z

108

The third, use of quantum mechanics to evaluate the molecular energy and forces, holds promise for future refinements when applied wholesale,  

E-Print Network [OSTI]

for future refinements when applied wholesale, but is already capable of producing valuable insight when

Sali, Andrej

109

Setting a retail generation credit  

SciTech Connect (OSTI)

While the additional cost components will vary depending on the way that the wholesale energy component is calculated, at minimum a generation credit should recognize the following costs: Additional value of shaping or load-following; Premia associated with the risks of serving retail load; Transmission costs incurred by competitive suppliers; Commercial costs; and Reasonable profits. In this article the author reviews the construction of a generation credit, starting with three different ways to compute the wholesale cost of electric energy--as a forecast, as a forward price, or from the spot market--and then moving to consideration of additional cost items. Throughout the authors attempts to estimate the costs an efficient competitor will incur in order to illustrate the difference between a retail generation credit and a wholesale price index.

Jacobs, J.M.

1999-05-01T23:59:59.000Z

110

The potential impacts of a competitive wholesale market in the midwest: A preliminary examination of centralized dispatch  

SciTech Connect (OSTI)

In March 2005, the Midwest Independent System Operator (MISO) will begin operating the first-ever wholesale market for electricity in the central and upper Midwestern portion of the United States. Region-wide, centralized, security-constrained, bid-based dispatch will replace the current system of decentralized dispatch by individual utilities and control areas. This report focuses on how the operation of generators may change under centralized dispatch. We analyze a stylized example of these changes by comparing a base case dispatch based on a ''snapshot'' taken from MISO's state estimator for an actual, historical dispatch (4 p.m., July 7, 2003) to a hypothetical, centralized dispatch that seeks to minimize the total system cost of production, using estimated cost data collected by the EIA. Based on these changes in dispatch, we calculate locational marginal prices, which in turn reveals the location of congestion within MISO's footprint, as well as the distribution of congestion revenues. We also consider two sensitivity scenarios that examine (1) the effect of changes in MISO membership (2003 vs. 2004 membership lists), and (2) different load and electrical data, based on a snapshot from a different date and time (1 p.m., Feb. 18, 2004). Although our analysis offers important insights into how the MISO market could operate when it opens, we do not address the question of the total benefits or costs of creating a wholesale market in the Midwest.

Lesieutre, Bernard C.; Bartholomew, Emily; Eto, Joseph H.; Hale, Douglas; Luong, Thanh

2004-07-01T23:59:59.000Z

111

The wholesale market for electricity in England and Wales : recent developments and future reforms  

E-Print Network [OSTI]

The England and Wales wholesale electricity market is about to undergo major reform (NETA). I describe and analyse the proposed arrangements, contrasting them with those currently in operation. I argue that while NETA will ...

Sweeting, Andrew

2000-01-01T23:59:59.000Z

112

On the stability of wholesale electricity markets under real-time pricing  

E-Print Network [OSTI]

The paper proposes a mathematical model for the dynamic evolution of supply, demand, and clearing prices under a class of real-time pricing mechanisms characterized by passing on the real-time wholesale prices to the end ...

Roozbehani, Mardavij

113

Innnovative wholesale carcass fabrication and retail cutting to optimize beef value  

E-Print Network [OSTI]

This study evaluated innovations in beef wholesale carcass fabrication that may have potential for improving subprimal yield and overall value of the beef carcass. Thirty beef carcasses, equally representing USDA Choice and Select and USDA yield...

Pfeiffer, Kyle David

2006-04-12T23:59:59.000Z

114

The Texas Wholesale Meat Distribution Industry -- Structure, Operational Characteristics and Competitive Practices.  

E-Print Network [OSTI]

[Blank Page in Original Bulletin] The Texas Wholesale Meat Distribution Industry - Structure, Operational Characteristics, and Competitive Practices Mentior, of a tradehark or a proprietary product does not constitute a guarantee or warranty... regard to race, color, religion, sex, age, or national origin. [Blank Page in Original Bulletin] CONTENTS Page Highlights Introduction ............9..8...v..000..000*.00.00.t8 1 Structural Characteristics of the U . S . and Texas Wholesale Meat...

Dietrich, Raymond A.

1976-01-01T23:59:59.000Z

115

An empirical investigation of the price linkages between wholesale beef and slaughter cattle prices  

E-Print Network [OSTI]

AN EMPIRICAL INVESTIGATION OF THE PRICE LINKAGES BETWEEN WHOLESALE BEEF AND SLAUGHTER CATTLE PRICES. A Thesis by CYNTHIA jANE OWEN Submitted to the Graduate College of Texas ASM University in partial fulfilment of the requirements... ~) Roy F. Gilbert ~) I. (Head of Departmen ) May 1987 ABSTRACT An Empirical Investigation of The Price Linkages Between Wholesale Beef and Slaughter Cattle Prices, (May 1987) Cynthia Jane Owen, B. S. . Univeristy of Guelph Chair of Advisory...

Owen, Cynthia Jane

1987-01-01T23:59:59.000Z

116

The Supply Function Equilibrium and its Policy Implications for Wholesale Electricity Auctions  

E-Print Network [OSTI]

www.eprg.group.cam.ac.uk E P R G W O R K IN G P A P E R Abstract The supply function equilibrium and its policy implications for wholesale electricity auctions EPRG Working Paper 1007 Cambridge Working Paper in Economics 1016 P鋜... Holmberg and David Newbery The supply function equilibrium provides a game-theoretic model of strategic bidding in oligopolistic wholesale electricity auctions. This paper presents an intuitive account of current understanding and shows how welfare...

Holmberg, P; Newbery, David

117

Competitive electricity markets and investment in new generating capacity  

E-Print Network [OSTI]

Evidence from the U.S. and some other countries indicates that organized wholesale markets for electrical energy and operating reserves do not provide adequate incentives to stimulate the proper quantity or mix of generating ...

Joskow, Paul L.

2006-01-01T23:59:59.000Z

118

Rhenium-188: Availability from the W-188/Re-188 Generator and Status of Current Applications  

SciTech Connect (OSTI)

Rhenium-188 is one of the most readily available generator derived and useful radionuclides for therapy emitting - particles (2.12 MeV, 71.1% and 1.965 MeV, 25.6%) and imageable gammas (155 KeV, 15.1%). The 188W/188Re generator is an ideal source for the long term (4-6 months) continuous availability of no carrier added (nca) 188Re suitable for the preparation of radiopharmaceuticals for radionuclide therapy. The challenges associated with the double neutron capture route of production of the parent 188W radionuclide have been a major impediment in the progress of application of 188Re. Tungsten-188 of adequate specific activity can be prepared only in 2-3 of the high flux reactors operating in the World. Several useful technologies have been developed for the preparation of clinical grade 188W/188Re generator. Since the specific activity of 188W used in the generator is relatively low (<5 Ci/g), the eluted 188ReO4- can have low radioactive concentration often insufficient for radiopharmaceutical preparation. However, several efficient post elution concentration techniques have been developed that yield clinically useful 188ReO4-. Rhenium-188 has been used for the preparation of therapeutic radiopharmaceuticals for the management of diseases such as bone metastasis, rheumatoid arthritis and primary cancers. Several early phase clinical studies using radiopharmaceuticals based on 188Re-labeled phosphonates, antibodies, peptides, lipiodol and particulates have been reported. This article reviews the availability, and use of188Re including a discussion of why broader use of 188Re has not progressed as ecpected as a popular radionuclide for therapy.

Pillai, M R A [Bhabha Atomic Research Centre, Mumbai, India; Dash, A [Bhabha Atomic Research Centre, Mumbai, India; Knapp Jr, Russ F [ORNL

2012-01-01T23:59:59.000Z

119

Status of advanced fuel candidates for Sodium Fast Reactor within the Generation IV International Forum  

SciTech Connect (OSTI)

The main challenge for fuels for future Sodium Fast Reactor systems is the development and qualification of a nuclear fuel sub-assembly which meets the Generation IV International Forum goals. The Advanced Fuel project investigates high burn-up minor actinide bearing fuels as well as claddings and wrappers to withstand high neutron doses and temperatures. The R&D outcome of national and collaborative programs has been collected and shared between the AF project members in order to review the capability of sub-assembly material and fuel candidates, to identify the issues and select the viable options. Based on historical experience and knowledge, both oxide and metal fuels emerge as primary options to meet the performance and the reliability goals of Generation IV SFR systems. There is a significant positive experience on carbide fuels but major issues remain to be overcome: strong in-pile swelling, atmosphere required for fabrication as well as Pu and Am losses. The irradiation performance database for nitride fuels is limited with longer term R&D activities still required. The promising core material candidates are Ferritic/Martensitic (F/M) and Oxide Dispersed Strengthened (ODS) steels.

F. Delage; J. Carmack; C. B. Lee; T. Mizuno; M. Pelletier; J. Somers

2013-10-01T23:59:59.000Z

120

Wholesale Power and Transmission Rate Projections 1993--2014 and Historical Wholesale Power Rates 1939--1992.  

SciTech Connect (OSTI)

This document provides a range of high, medium, and low case long-term projections of Bonneville Power Administration`s (BPA) wholesale power rates and a medium case long-term projection of BPA`s wheeling rates. These projections are produced annually by BPA. BPA uses these projections in long-term marketing, resource, transmission, and financial planning assessments. BPA`s projections also are used by public utility commissions, utilities, and others for a variety of planning purposes. The analysis used for these rate projections assumes that current rate making methodologies continue into the future and are further based on certain assumptions about regional loads, extra-regional markets, the costs of resources, BPA`s financial requirements, and the capability of the region`s power plants. While these projections are intended to address the overall uncertainty in rate levels, BPA realizes that the future will not reflect any specific set of assumptions. The rate projections in this document have been prepared prior to the Draft 1993 BPA Marketing Plan, the implementation of which is almost certain to push BPA away from any set of assumptions in this document. Therefore, this document can be thought of as representing the ``old`` BPA with its products and policies. It can be viewed as a starting point or reference point to measure the impact of the ``new`` BPA with its Marketing Plan, and the broader undertaking referred to as the Competitiveness Project.

US Bonneville Power Administration

1993-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

2007 Wholesale Power Rate Case Initial Proposal : Risk Analysis Study.  

SciTech Connect (OSTI)

The Federal Columbia River Power System (FCRPS), operated on behalf of the ratepayers of the PNW by BPA and other Federal agencies, faces many uncertainties during the FY 2007-2009 rate period. Among these uncertainties, the largest revolve around hydro conditions, market prices and river operations for fish recovery. In order to provide a high probability of making its U.S. Treasury payments, BPA performs a Risk Analysis as part of its rate-making process. In this Risk Analysis, BPA identifies key risks, models their relationships, and then analyzes their impacts on net revenues (total revenues less expenses). BPA subsequently evaluates in the ToolKit Model the Treasury Payment Probability (TPP) resulting from the rates, risks, and risk mitigation measures described here and in the Wholesale Power Rate Development Study (WPRDS). If the TPP falls short of BPA's standard, additional risk mitigation revenues, such as PNRR and CRAC revenues are incorporated in the modeling in ToolKit until the TPP standard is met. Increased wholesale market price volatility and six years of drought have significantly changed the profile of risk and uncertainty facing BPA and its stakeholders. These present new challenges for BPA in its effort to keep its power rates as low as possible while fully meeting its obligations to the U.S. Treasury. As a result, the risk BPA faces in not receiving the level of secondary revenues that have been credited to power rates before receiving those funds is greater. In addition to market price volatility, BPA also faces uncertainty around the financial impacts of operations for fish programs in FY 2006 and in the FY 2007-2009 rate period. A new Biological Opinion or possible court-ordered change to river operations in FY 2006 through FY 2009 may reduce BPA's net revenues included Initial Proposal. Finally, the FY 2007-2009 risk analysis includes new operational risks as well as a more comprehensive analysis of non-operating risks. Both the operational and non-operational risks will be described in Section 2.0 of this study. Given these risks, if rates are designed using BPA's traditional approach of only adding Planned Net Revenues for Risk (PNRR), power rates would need to recover a much larger ''risk premium'' to meet BPA's TPP standard. As an alternative to high fixed risk premiums, BPA is proposing a risk mitigation package that combines PNRR with a variable rate mechanism similar to the cost recovery adjustment mechanisms used in the FY 2002-2006 rate period. The proposed risk mitigation package is less expensive on a forecasted basis because the rates can be adjusted on an annual basis to respond to uncertain financial outcomes. BPA is also proposing a Dividend Distribution Clause (DDC) to refund reserves in excess of $800M to customers in the event net revenues in the next rate period exceed current financial forecasts.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

122

Site Selection & Characterization Status Report for Next Generation Nuclear Plant (NGNP)  

SciTech Connect (OSTI)

In the near future, the US Department of Energy (DOE) will need to make important decisions regarding design and construction of the Next Generation Nuclear Plant (NGNP). One part of making these decisions is considering the potential environmental impacts that this facility may have, if constructed here at the Idaho National Laboratory (INL). The National Environmental Policy Act (NEPA) of 1969 provides DOE decision makers with a process to systematically consider potential environmental consequences of agency decisions. In addition, the Energy Policy Act of 2005 (Title VI, Subtitel C, Section 644) states that the 'Nuclear Regulatory Commission (NRC) shall have licensing and regulatory authority for any reactor authorized under this subtitle.' This stipulates that the NRC will license the NGNP for operation. The NRC NEPA Regulations (10 CFR Part 51) require tha thte NRC prepare an Environmental Impact Statement (EIS) for a permit to construct a nuclear power plant. The applicant is required to submit an Environmental report (ER) to aid the NRC in complying with NEPA.

Mark Holbrook

2007-09-01T23:59:59.000Z

123

NEXT GENERATION MELTER(S) FOR VITRIFICATION OF HANFORD WASTE STATUS AND DIRECTION  

SciTech Connect (OSTI)

Vitrification technology has been selected to treat high-level waste (HLW) at the Hanford Site, the West Valley Demonstration Project and the Savannah River Site (SRS), and low activity waste (LAW) at Hanford. In addition, it may potentially be applied to other defense waste streams such as sodium bearing tank waste or calcine. Joule-heated melters (already in service at SRS) will initially be used at the Hanford Site's Waste Treatment and Immobilization Plant (WTP) to vitrify tank waste fractions. The glass waste content and melt/production rates at WTP are limited by the current melter technology. Significant reductions in glass volumes and mission life are only possible with advancements in melter technology coupled with new glass formulations. The Next Generation Melter (NGM) program has been established by the U.S. Department of Energy's (DOE's), Environmental Management Office of Waste Processing (EM-31) to develop melters with greater production capacity (absolute glass throughput rate) and the ability to process melts with higher waste fractions. Advanced systems based on Joule-Heated Ceramic Melter (JHCM) and Cold Crucible Induction Melter (CCIM) technologies will be evaluated for HLW and LAW processing. Washington River Protection Solutions (WRPS), DOE's tank waste contractor, is developing and evaluating these systems in cooperation with EM-31, national and university laboratories, and corporate partners. A primary NGM program goal is to develop the systems (and associated flowsheets) to Technology Readiness Level 6 by 2016. Design and testing are being performed to optimize waste glass process envelopes with melter and balance of plant requirements. A structured decision analysis program will be utilized to assess the performance of the competing melter technologies. Criteria selected for the decision analysis program will include physical process operations, melter performance, system compatibility and other parameters.

RAMSEY WG; GRAY MF; CALMUS RB; EDGE JA; GARRETT BG

2011-01-13T23:59:59.000Z

124

Comparison of systems for the distribution of lamb carcasses and wholesale cuts  

E-Print Network [OSTI]

COMPARISON OF SYSTEMS FOR THE DISTRIBUTION OF LAMB CARCASSES AND WHOLESALE CUTS A Thesis by JOSEPH DARYL TATUM Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER... OF SCIENCE Play 1976 M+or SubJect: Animal Science (Meats) COMPARISON OF SYSTEMS FOR THE DISTRIBUTION OF LAMB CARCASSES AND WHOLESALE CUTS A Thesis by JOSEPH DARYL TATUM Approved as to style and content by: 0) o (Co-C a man of Committee) ( -Chairman...

Tatum, Joseph Daryl

1976-01-01T23:59:59.000Z

125

USAEE/IAEE North American Conference, Washington, D.C., July 8-10, 2004 Testing the Reliability of FERC's Wholesale Power Market Platform  

E-Print Network [OSTI]

the Reliability of FERC's Wholesale Power Market Platform: An Agent-Based Computational Economics Approach Deddy@iastate.edu Abstract: In April 2003 the U.S. Federal Energy Regulatory Commission proposed the Wholesale Power Market Platform (WPMP) for common adoption by U.S. wholesale power markets. The WPMP is a complicated market

Tesfatsion, Leigh

126

Long-term contracts for new investments in power generation capacity : pain or gain?  

E-Print Network [OSTI]

In recent years, a debate has ensued regarding the role of long-term power purchase agreements for securing investments in power generation capacity in organized wholesale markets. This thesis illuminates the issues ...

Sakhrani, Vivek A. (Vivek Ashok)

2010-01-01T23:59:59.000Z

127

CALIFORNIA'S NEXT GENERATION OF LOAD MANAGEMENT STANDARDS  

E-Print Network [OSTI]

eliminate the need for new peaking generation capacity and associated transmission and distribution capacity. By reducing capacity, generation and infrastructure costs, it can lower total power costs and customer bills wholesale power spot markets more competitive and efficient and less subject to the abuse of market power

128

CALIFORNIA'S NEXT GENERATION OF LOAD MANAGEMENT STANDARDS  

E-Print Network [OSTI]

the need for new peaking generation capacity and associated transmission and distribution capacity. By reducing capacity, generation and infrastructure costs, it can lower total power costs and customer bills wholesale power spot markets more competitive and efficient and less subject to the abuse of market power

129

Integrating Renewable Energy Contracts and Wholesale Dynamic Pricing to Serve Aggregate  

E-Print Network [OSTI]

1 Integrating Renewable Energy Contracts and Wholesale Dynamic Pricing to Serve Aggregate Flexible energy, dynamic programming. I. INTRODUCTION Dynamic pricing has the potential to materialize the poten many of the operational problems that arise from renewable energy integration through dynamic pricing

Oren, Shmuel S.

130

Abstract--Although Locational Marginal Pricing (LMP) plays an important role in many restructured wholesale power  

E-Print Network [OSTI]

1 Abstract-- Although Locational Marginal Pricing (LMP) plays an important role in many Terms-- Locational marginal pricing, wholesale power market, AC optimal power flow, DC optimal power congestion by means of Locational Marginal Pricing (LMP), i.e., the pricing of power by the location

Tesfatsion, Leigh

131

Hedging Quantity Risks with Standard Power Options in a Competitive Wholesale Electricity  

E-Print Network [OSTI]

Hedging Quantity Risks with Standard Power Options in a Competitive Wholesale Electricity Market, GA, 30332-0205 USA March 3, 2005 Abstract This paper addresses quantity risk in the electricity of a load serving entity, which provides electricity service at a regulated price in electricity markets

132

Hedging Quantity Risks with Standard Power Options in a Competitive Wholesale Electricity Market  

E-Print Network [OSTI]

Hedging Quantity Risks with Standard Power Options in a Competitive Wholesale Electricity MarketScience (www.interscience.wiley.com). Abstract: This paper addresses quantity risk in the electricity market-serving entity, which provides electricity service at a regulated price in electricity markets with price

Oren, Shmuel S.

133

Are agent-based simulations robust? The wholesale electricity trading case  

E-Print Network [OSTI]

best-response and reinforcement learning but not under fictitious play. The simulations perform well in practice. This paper explores the consistency of some of its standard techniques. We focus in particular on prevailing wholesale electricity trading simulation methods. We include different supply and demand

Tesfatsion, Leigh

134

The effect of falling market concentration on prices, generator behaviour and productive efficiency in the England and Wales electricity market  

E-Print Network [OSTI]

A universal prediction of the various oligopoly models used to predict and explain behaviour in the England and Wales (E&W) electricity wholesale market is that divestiture of plants by the two large incumbent generators ...

Sweeting, Andrew

2001-01-01T23:59:59.000Z

135

Effects of Demand Response on Retail and Wholesale Power Markets  

SciTech Connect (OSTI)

Demand response has grown to be a part of the repertoire of resources used by utilities to manage the balance between generation and load. In recent years, advances in communications and control technology have enabled utilities to consider continuously controlling demand response to meet generation, rather than the other way around. This paper discusses the economic applications of a general method for load resource analysis that parallels the approach used to analyze generation resources and uses the method to examine the results of the US Department of Energy抯 Olympic Peninsula Demonstration Testbed. A market-based closed-loop system of controllable assets is discussed with necessary and sufficient conditions on system controllability, observability and stability derived.

Chassin, David P.; Kalsi, Karanjit

2012-07-26T23:59:59.000Z

136

The role of content regulation on pricing and market power in regional retail and wholesale gasoline markets  

E-Print Network [OSTI]

Since 1999, regional retail and wholesale gasoline markets in the United States have experienced significant price volatility, both intertemporally and across geographic markets. This paper focuses on one potential explanation ...

Muehlegger, Erich J.

2002-01-01T23:59:59.000Z

137

Feasibility of Wholesale Electricity Competition in a Developing Country: Insights from Simulating a Market in Maharashtra State, India  

E-Print Network [OSTI]

I assume that private firms in the MH electricity market actand private firms will play important roles in the electricityand private firms operate in the sector at the same time) on wholesale electricity

Phadke, Amol

2007-01-01T23:59:59.000Z

138

Modeling of sorption isotherms of dried vegetable wastes from wholesale market  

SciTech Connect (OSTI)

The moisture sorption isotherms of dried vegetable wastes (based on green leaves and fruits) from wholesale market were determined at 25, 40, 60 and 90 C by the static gravimetric method. Experimental data were fit by using several mathematical models. The G.A.B. and the Halsey model gave the minimum mean square error. G.A.B. parameters were related with temperature by Arrhenius expressions.

Lopez, A.; Iguaz, A.; Esnoz, A.; Virseda, P.

2000-05-01T23:59:59.000Z

139

The Value of Distributed Generation and CHP Resources in Wholesale Power  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage 禄of EnergyThe EnergyDepartment of Energy The U.S. and

140

Evolution of Wholesale Electricity Market Design with Increasing Levels of Renewable Generation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy and Assistance100 tonusing ARMEvenFlames. |RecentEvolution of

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Modeling of GE Appliances: Cost Benefit Study of Smart Appliances in Wholesale Energy, Frequency Regulation, and Spinning Reserve Markets  

SciTech Connect (OSTI)

This report is the second in a series of three reports describing the potential of GE抯 DR-enabled appliances to provide benefits to the utility grid. The first report described the modeling methodology used to represent the GE appliances in the GridLAB-D simulation environment and the estimated potential for peak demand reduction at various deployment levels. The third report will explore the technical capability of aggregated group actions to positively impact grid stability, including frequency and voltage regulation and spinning reserves, and the impacts on distribution feeder voltage regulation, including mitigation of fluctuations caused by high penetration of photovoltaic distributed generation. In this report, a series of analytical methods were presented to estimate the potential cost benefit of smart appliances while utilizing demand response. Previous work estimated the potential technical benefit (i.e., peak reduction) of smart appliances, while this report focuses on the monetary value of that participation. The effects on wholesale energy cost and possible additional revenue available by participating in frequency regulation and spinning reserve markets were explored.

Fuller, Jason C.; Parker, Graham B.

2012-12-31T23:59:59.000Z

142

A normal-faulting seismic sequence triggered by the 2011 off the Pacific coast of Tohoku Earthquake: Wholesale stress regime changes in the upper plate  

E-Print Network [OSTI]

: Wholesale stress regime changes in the upper plate Aitaro Kato*1 , Shin'ichi Sakai1 , and Kazushige Obara1 1

Kato, Aitaro

143

MOON for a next-generation neutrino-less double-beta decay experiment: Present status and perspective  

SciTech Connect (OSTI)

The performance of the MOON detector for a next-generation neutrino-less double-beta decay experiment was evaluated by means of the Monte Carlo method. The MOON detector was found to be a feasible solution for the future experiment to search for the Majorana neutrino mass in the range of 100-30 meV.

Shima, T.; /Osaka U., Res. Ctr. Nucl. Phys.; Doe, P.J.; /Washington U., Seattle; Ejiri, H.; /Osaka U., Res. Ctr. Nucl. Phys. /NIRS, Chiba /Prague, Tech. U.; Elliot, S.R.; /Washington U., Seattle /Los Alamos; Engel, J.; /North Carolina U.; Finger, M.; /Charles U.; Finger, M.; /Charles U.; Fushimi, K.; /Tokushima U.; Gehman, V.M.; /Washington U., Seattle /Los Alamos; Greenfield, M.B.; /Tokyo, Intl. Christian U.; Hazama, R.; /Hiroshima U. /NIRS, Chiba

2008-01-01T23:59:59.000Z

144

Relative efficiency benefits of wholesale and retail competition in electricity: An analysis and a research agenda  

SciTech Connect (OSTI)

A central issue in the debate over restructuring the electric power industry is the extent to which the market should be open to competition. One aspect of this debate is whether competition ought to be restricted to the whole sale power market or be extended to final retail consumers. This report begins to explore the potential differences in economic efficiency between wholesale and retail competition in the electric power industry. The two market-structure scenarios are defined and the factors responsible for differences in efficiency are described. The report also contains an assessment of the relative importance of the factors and recommendations for pursuing further research.

Bohi, D.R.; Palmer, K.L. [Resources for the Future, Inc., Washington, DC (United States)] [Resources for the Future, Inc., Washington, DC (United States)

1996-03-01T23:59:59.000Z

145

SCE&G-1-E Wholesale Power Rate Schedule | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015DepartmentDepartment ofSoft Costs 禄1-E Wholesale Power Rate

146

SCE&G-2-E Wholesale Power Rate Schedule | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015DepartmentDepartment ofSoft Costs 禄1-E Wholesale Power

147

SCE&G-3-E Wholesale Power Rate Schedule | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015DepartmentDepartment ofSoft Costs 禄1-E Wholesale Power3-E

148

SCE&G-4-E Wholesale Power Rate Schedule | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015DepartmentDepartment ofSoft Costs 禄1-E Wholesale

149

2007 Wholesale Power Rate Case Final Proposal : Load Resource Study and Documentation.  

SciTech Connect (OSTI)

The Load Resource Study (Study) represents the compilation of the load and contract obligations, contact purchases, and resource data necessary for developing BPA's wholesale power rates. The results of this Study are used to: (1) provide data to determine resource costs for the Revenue Requirement Study, WP-07-FS-BPA-02; (2) provide data to derive billing determinants for the revenue forecast in the Wholesale Power Rate Development Study (WPRDS), WP-07-FS-BPA-05; (3) provide load and resource data for use in the Risk Analysis Study, WP-07-FS-BPA-04; and (4) provide regional hydro data for use in the secondary revenue forecast for the Market Price Forecast Study, WP-07-FS-BPA-03. This Study provides a synopsis of BPA's load resource analyses. This Study illustrates how each component is completed, how components relate to each other, and how each component fits into the rate development process. Details and results supporting this Study are contained in the Load Resource Study Documentation, WP-07-FS-BPA-01A.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

150

2007 Wholesale Power Rate Case Initial Proposal : Load Resource Study and Documentation.  

SciTech Connect (OSTI)

The Load Resource Study (Study) represents the compilation of the loads, sales, contracts, and resource data necessary for developing BPA wholesale power rates. The results of this Study are used to: (1) provide base data to determine resource costs for the Revenue Requirement Study, WP-07-E-BPA-02; (2) provide regional hydro data for use in the secondary revenue forecast for the Market Power Study, WP-07-E-BPA-03; (3) provide base data to derive billing determinants for the revenue forecast in the Wholesale Power Rate Development Study (WPRDS), WP-07-E-BPA-05; and (4) provide load and resource data for use in calculating risk in the Risk Analysis Study, WP-07-E-BPA-04. This Study provides a synopsis of BPA's load resource analyses. This Study illustrates how each component is completed, how components relate to each other, and how each component fits into the rate development process. Details and results supporting this Study are contained in the Load Resource Documentation, WP-07-E-BPA-01A.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

151

COMM-OPINION-ORDER, 76 FERC 61,347, Promoting Wholesale Competition Through Open-Access Non-discriminatory Transmission Services by Public Utilities, Docket No. RM95-8-000, Recovery of Stranded Costs by  

E-Print Network [OSTI]

COMM-OPINION-ORDER, 76 FERC 露61,347, Promoting Wholesale Competition Through Open-Access Non Incorporated Promoting Wholesale Competition Through Open-Access Non-discriminatory Transmission Services Utilities, Docket No. RM94-7-001 [62,646] [露61,347] Promoting Wholesale Competition Through Open-Access Non

Laughlin, Robert B.

152

COMM-OPINION-ORDER, 75 FERC 61,208, Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and  

E-Print Network [OSTI]

COMM-OPINION-ORDER, 75 FERC 露61,208, Promoting Wholesale Competition Through Open Access Non Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities-7-001 [61,687] [露61,208] Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission

Laughlin, Robert B.

153

Status report on multigroup cross section generation code development for high-fidelity deterministic neutronics simulation system.  

SciTech Connect (OSTI)

Under the fast reactor simulation program launched in April 2007, development of an advanced multigroup cross section generation code was initiated in July 2007, in conjunction with the development of the high-fidelity deterministic neutron transport code UNIC. The general objectives are to simplify the existing multi-step schemes and to improve the resolved and unresolved resonance treatments. Based on the review results of current methods and the fact that they have been applied successfully to fast critical experiment analyses and fast reactor designs for last three decades, the methodologies of the ETOE-2/MC{sup 2}-2/SDX code system were selected as the starting set of methodologies for multigroup cross section generation for fast reactor analysis. As the first step for coupling with the UNIC code and use in a parallel computing environment, the MC{sup 2}-2 code was updated by modernizing the memory structure and replacing old data management package subroutines and functions with FORTRAN 90 based routines. Various modifications were also made in the ETOE-2 and MC{sup 2}-2 codes to process the ENDF/B-VII.0 data properly. Using the updated ETOE-2/MC{sup 2}-2 code system, the ENDF/B-VII.0 data was successfully processed for major heavy and intermediate nuclides employed in sodium-cooled fast reactors. Initial verification tests of the MC{sup 2}-2 libraries generated from ENDF/B-VII.0 data were performed by inter-comparison of twenty-one group infinite dilute total cross sections obtained from MC{sup 2}-2, VIM, and NJOY. For almost all nuclides considered, MC{sup 2}-2 cross sections agreed very well with those from VIM and NJOY. Preliminary validation tests of the ENDF/B-VII.0 libraries of MC{sup 2}-2 were also performed using a set of sixteen fast critical benchmark problems. The deterministic results based on MC{sup 2}-2/TWODANT calculations were in good agreement with MCNP solutions within {approx}0.25% {Delta}{rho}, except a few small LANL fast assemblies. Relative to the MCNP solution, the MC{sup 2}-2/TWODANT results overestimated the multiplication factor by 0.22 {approx} 0.35% {Delta}{rho} for these small systems with very hard neutron spectrum. Comparisons of measured and calculated values for the fission reaction rate ratios of Godiva and Jezebel assemblies also showed that the MC{sup 2}-2/TWODANT results agreed well with measurements within 2.7%. From a series of methodology review and ENDF/B-VII.0 data processing, several improvement needs to enhance accuracy were also identified for the ETOE-2/MC{sup 2}-2 code system, including the multigroup slowing-down solution for whole-energy range, proper treatment for anisotropy of inelastic scattering, improved evaluation of inelastic and high-order anisotropic scattering source in RABANL calculations.

Yang, W. S.; Lee, C. H. (Nuclear Engineering Division) [Nuclear Engineering Division

2008-05-16T23:59:59.000Z

154

Energy Use in California Wholesale Water Operations: Development and Application of a General Energy Post-Processor for California Water  

E-Print Network [OSTI]

-i- Energy Use in California Wholesale Water Operations: Development and Application of a General Energy Post-Processor for California Water Management Models By MATTHEW EARL BATES B.S. (California State- Abstract This thesis explores the effects of future water and social conditions on energy consumption

Lund, Jay R.

155

Understanding the Benefits of Dispersed Grid-Connected Photovoltaics: From Avoiding the Next Major Outage to Taming Wholesale Power Markets  

SciTech Connect (OSTI)

Thanks to new solar resource assessment techniques using cloud cover data available from geostationary satellites, it is apparent that grid-connected PV installations can serve to enhance electric grid reliability, preventing or hastening recovery from major power outages and serving to mitigate extreme price spikes in wholesale energy markets. (author)

Letendre, Steven E.; Perez, Richard

2006-07-15T23:59:59.000Z

156

Thin-layer drying behavior of vegetable wastes from wholesale market  

SciTech Connect (OSTI)

The thin-layer drying behavior of vegetable wastes (as a mix of lettuce and cauliflower leaves) from wholesale market for a temperature range of 50--150 C was determined. Drying of this material was found to take part only in the falling-rate period. The experimental data were fitted to the simple exponential model and the Page model. Both models have good prediction capability. Effective diffusion coefficient varied from 6.03 x 10{sup {minus}9} to 3.15 x 10{sup {minus}8} m{sup 2}/s with an activation energy of diffusion of 19.82 kJ/mol. The temperature dependence of the effective diffusion coefficient was expressed by an Arrhenius-type relationship.

Lopez, A.; Iguaz, A.; Esnoz, A.; Virseda, P.

2000-05-01T23:59:59.000Z

157

An assessment of Texas wholesale nursery grower and the effect of selected growth retardants on Salvia farinacea x longispicata "Indigo Spires"  

E-Print Network [OSTI]

Record of Study An Assessment of a Texas Wholesale Nursery Grower and The Effect of Selected Growth Retardants on Sal via farinacea x longispicata 'Indigo Spires' A PROFESSIONAL PAPER by David Rodriguez Submitted to the College... of Agriculture of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF AGRICULTURE November, 1992 Department of Horticultural Sciences An Assessment of a Texas Wholesale Nursery Grower and The Effect of Selected...

Rodriguez, David

1992-01-01T23:59:59.000Z

158

2007 Wholesale Power Rate Case Initial Proposal : Section 7(b)(2) Rate Test Study.  

SciTech Connect (OSTI)

Section 7(b)(2) of the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act), 16 U.S.C. {section} 839e(b)(2), directs the Bonneville Power Administration (BPA) to conduct, after July 1, 1985, a comparison of the projected rates to be charged its preference and Federal agency customers for their firm power requirements, over the rate test period plus the ensuing four years, with the costs of power (hereafter called rates) to those customers for the same time period if certain assumptions are made. The effect of this rate test is to protect BPA's preference and Federal agency customers wholesale firm power rates from certain specified costs resulting from provisions of the Northwest Power Act. The rate test can result in a reallocation of costs from the general requirements loads of preference and Federal agency customers to other BPA loads. The rate test involves the projection and comparison of two sets of wholesale power rates for the general requirements loads of BPA's public body, cooperative, and Federal agency customers (7(b)(2) Customers). The two sets of rates are: (1) a set for the test period and the ensuing four years assuming that section 7(b)(2) is not in effect (known as Program Case rates); and (2) a set for the same period taking into account the five assumptions listed in section 7(b)(2), (known as 7(b)(2) Case rates). Certain specified costs allocated pursuant to section 7(g) of the Northwest Power Act are subtracted from the Program Case rates. Next, each nominal rate is discounted to the beginning of the test period of the relevant rate case. The discounted Program Case rates are averaged, as are the 7(b)(2) Case rates. Both averages are rounded to the nearest tenth of a mill for comparison. If the average Program Case rate is greater than the average 7(b)(2) Case rate, the rate test triggers. The difference between the average Program Case rate and the average 7(b)(2) Case rate determines the amount to be reallocated from the 7(b)(2) Customers to other BPA loads in the rate proposal test period.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

159

2007 Wholesale Power Rate Case Final Proposal : Risk Analysis Study Documentation.  

SciTech Connect (OSTI)

The RiskMod Model is comprised of a set of risk simulation models, collectively referred to as RiskSim; a set of computer programs that manages data referred to as Data Management Procedures; and RevSim, a model that calculates net revenues. RiskMod interacts with the AURORA Model, the RAM2007, and the ToolKit Model during the process of performing the Risk Analysis Study. AURORA is the computer model being used to perform the Market Price Forecast Study (see Market Price Forecast Study, WP-07-FS-BPA-03); the RAM2007 is the computer model being used to calculate rates (see Wholesale Power Rate Development Study, WP-07-FS-BPA-05); and the ToolKit is the computer model being used to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard (see Section 3 in the Risk Analysis Study, WP-07-FS-BPA-04). Variations in monthly loads, resources, natural gas prices, forward market electricity prices, transmission expenses, and aluminum smelter benefit payments are simulated in RiskSim. Monthly spot market electricity prices for the simulated loads, resources, and natural gas prices are estimated by the AURORA Model. Data Management Procedures facilitate the format and movement of data that flow to and/or from RiskSim, AURORA, and RevSim. RevSim estimates net revenues using risk data from RiskSim, spot market electricity prices from AURORA, loads and resources data from the Load Resource Study, WP-07-FS-BPA-01, various revenues from the Revenue Forecast component of the Wholesale Power Rate Development Study, WP-07-FSBPA-05, and rates and expenses from the RAM2007. Annual average surplus energy revenues, purchased power expenses, and section 4(h)(10)(C) credits calculated by RevSim are used in the Revenue Forecast and the RAM2007. Heavy Load Hour (HLH) and Light Load Hour (LLH) surplus and deficit energy values from RevSim are used in the Transmission Expense Risk Model. Net revenues estimated for each simulation by RevSim are input into the ToolKit Model to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard. The processes and interaction between each of the models and studies are depicted in Graph 1.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

160

2007 Wholesale Power Rate Case Initial Proposal : Risk Analysis Study Documentation.  

SciTech Connect (OSTI)

The RiskMod Model is comprised of a set of risk simulation models, collectively referred to as RiskSim; a set of computer programs that manages data referred to as Data Management Procedures; and RevSim, a model that calculates net revenues. RiskMod interacts with the AURORA Model, the RAM2007, and the ToolKit Model during the process of performing the Risk Analysis Study. AURORA is the computer model being used to perform the Market Price Forecast Study (see Market Price Forecast Study, WP-07-E-BPA-03); the RAM2007 is the computer model being used to calculate rates (see Wholesale Power Rate Development Study, WP-07-E-BPA-05); and the ToolKit is the computer model being used to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard (see Section 3 in the Risk Analysis Study, WP-07-E-BPA-04). Variations in monthly loads, resources, natural gas prices, forward market electricity prices, transmission expenses, and aluminum smelter benefit payments are simulated in RiskSim. Monthly spot market electricity prices for the simulated loads, resources, and natural gas prices are estimated by the AURORA Model. Data Management Procedures facilitate the format and movement of data that flow to and/or from RiskSim, AURORA, and RevSim. RevSim estimates net revenues using risk data from RiskSim, spot market electricity prices from AURORA, loads and resources data from the Load Resource Study, WP-07-E-BPA-01, various revenues from the Revenue Forecast component of the Wholesale Power Rate Development Study, WP-07-E-BPA-05, and rates and expenses from the RAM2007. Annual average surplus energy revenues, purchased power expenses, and section 4(h)(10)(C) credits calculated by RevSim are used in the Revenue Forecast and the RAM2007. Heavy Load Hour (HLH) and Light Load Hour (LLH) surplus and deficit energy values from RevSim are used in the Transmission Expense Risk Model. Net revenues estimated for each simulation by RevSim are input into the ToolKit Model to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard. The processes and interaction between each of the models and studies are depicted in Graph 1.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Reforming TSOs: using the 'third package' Legislation to promote efficiency and accelerate regional integration in EU wholesale power markets  

SciTech Connect (OSTI)

The EU is developing new legislation - the so-called ''Third Package'' - to foster competition in its electric power markets. These proposals could be improved by adding more focus on regional integration of wholesale power markets, allowing more leeway for arrangements that fit the diverse existing patterns of transmission ownership and control, and addressing upfront new regulatory concerns that arise when transmission is divested as an independent, for-profit business. (author)

Moselle, Boaz

2008-10-15T23:59:59.000Z

162

2007 Wholesale Power Rate Adjustment Proceeding (WP-07) : Administrator's Final Record of Decision.  

SciTech Connect (OSTI)

This Record of Decision (ROD) contains the decisions of the Bonneville Power Administration (BPA), based on the record compiled in this rate proceeding, with respect to the adoption of power rates for the three-year rate period commencing October 1, 2006, through September 30, 2009. This ''2007 Wholesale Power Rate Adjustment Proceeding'' is designed to establish replacement rate schedules and General Rate Schedule Provisions (GRSPs) for those that expire on September 30, 2006. This power rate case also establishes the General Transfer Agreement (GTA) Delivery Charge for the period of October 1, 2007, through September 30, 2009. BPA's Power Subscription Strategy and Record of Decision (Subscription Strategy), as well as other Agency processes, provide much of the policy context for this rate case and are described in Section 2. This ROD follows a full evidentiary hearing and briefing, including an Oral Argument before the BPA Administrator. Sections 3 through 18, including any appendices or attachments, present the issues raised by parties in this proceeding, the parties positions, BPA staff positions on the issues, BPA's evaluations of the positions, and the Administrator's decisions. Parties had the opportunity to file briefs on exceptions to the Draft ROD, before issuance of this Final Record of Decision.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

163

Moral Status  

E-Print Network [OSTI]

Chapters One through Three present the following view: (i) I explain moral status as follows: something has moral status just in case we have reasons not to cause harms to it simply in virtue of the badness of the harms ...

Harman, Elizabeth, 1975-

2003-01-01T23:59:59.000Z

164

2007 Wholesale Power Rate Case Final Proposal : Section 7(b)(2) Rate Test Study and Documentation.  

SciTech Connect (OSTI)

Section 7(b)(2) of the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act), 16 U.S.C. {section} 839e(b)(2), directs the Bonneville Power Administration (BPA) to conduct, after July 1, 1985, a comparison of the projected rates to be charged its preference and Federal agency customers for their firm power requirements, over the rate test period plus the ensuing 4 years, with the costs of power (hereafter called rates) to those customers for the same time period if certain assumptions are made. The effect of this rate test is to protect BPA's preference and Federal agency customers wholesale firm power rates from certain specified costs resulting from certain provisions of the Northwest Power Act. The rate test can result in a reallocation of costs from the general requirements loads of preference and Federal agency customers to other BPA loads. The rate test involves the projection and comparison of two sets of wholesale power rates for the general requirement loads of BPA's public body, cooperative, and Federal agency customers (collectively, the 7(b)(2) Customers). The two sets of rates are: (1) a set for the test period and the ensuing four years assuming that Section 7(b)(2) is not in effect (known as Program Case rates); and (2) a set for the same period taking into account the five assumptions listed in section 7(b)(2) (known as 7(b)(2) Case rates). Certain specified costs allocated pursuant to section 7(g) of the Northwest Power Act are subtracted from the Program Case rates. Next, each nominal rate is discounted to the beginning of the test period of the relevant rate case. The discounted Program Case rates are averaged, as are the 7(b)(2) Case rates. Both averages are rounded to the nearest tenth of a mill for comparison. If the average of the Program Case rates is greater than the average of the 7(b)(2) Case rates, the rate test triggers. The difference between the average of the Program Case rates and the average of the 7(b)(2) Case rates determines the amount to be reallocated from the 7(b)(2) Customers to other BPA loads in the rate test period. The purpose of this Study is to describe the application of the ''Section 7(b)(2) Implementation Methodology (Implementation Methodology)'' and the results of such application. The accompanying Section 7(b)(2) Rate Test Study Documentation, WP-07-FS-BPA-06A, contains the documentation of the computer models and data used to perform the 7(b)(2) rate test. This Study is organized into three major sections. The first section provides an introduction to the study, as well as a summary of the section ''7(b)(2) Legal Interpretation and Implementation Methodology''. The second section describes the methodology used in conducting the rate test. It provides a discussion of the calculations performed to project the two sets of power rates that are compared in the rate test. The third section presents a summary of the results of the rate test for the WP-07 Final Rate Proposal.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

165

Effects of Temporal Wind Patterns on the Value of Wind-Generated Electricity at Different Sites in California and the Northwest  

E-Print Network [OSTI]

power system抯 load and wholesale market prices (Burton etgeographical area on wholesale market value or capacityMontana and Wyoming) with wholesale power prices and loads

Fripp, Matthias; Wiser, Ryan

2006-01-01T23:59:59.000Z

166

Agent-Based Simulation of Distribution Systems with High Penetration of Photovoltaic Generation  

E-Print Network [OSTI]

of strategic trading in restructured wholesale power markets with congestion managed by locational marginal when coupled with increased price-sensitivity of demand as realized through demand response, demand dispatch, and/or price-sensitive demand bidding. Index Terms--Distributed power generation, multiagent sys

Tesfatsion, Leigh

167

Current Status of Concentrator Photovoltaic (CPV) Technology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(CPV) technology has recently entered the market as a utility- scale option for the generation of solar electricity. This report explores the current status of CPV technology...

168

Operation of Distributed Generation Under Stochastic Prices  

SciTech Connect (OSTI)

We model the operating decisions of a commercial enterprisethatneeds to satisfy its periodic electricity demand with either on-sitedistributed generation (DG) or purchases from the wholesale market. Whilethe former option involves electricity generation at relatively high andpossibly stochastic costs from a set of capacity-constrained DGtechnologies, the latter implies unlimited open-market transactions atstochastic prices. A stochastic dynamic programme (SDP) is used to solvethe resulting optimisation problem. By solving the SDP with and withoutthe availability of DG units, the implied option values of the DG unitsare obtained.

Siddiqui, Afzal S.; Marnay, Chris

2005-11-30T23:59:59.000Z

169

CCN 217493 - Provide a Progress Report Describing the Status...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 of 6 Next Generation Nuclear Plant Licensing NGNP FUEL QUALIFICATION WHITE PAPER DEVELOPMENT STATUS REPORT August 2009 Introduction The Next Generation Nuclear Plant (NGNP)...

170

Do Markets Reduce Costs? Assessing the Impact of Regulatory Restructuring on U.S. Electric Generation Efficiency  

E-Print Network [OSTI]

Do Markets Reduce Costs? Assessing the Impact of Regulatory Restructuring on U.S. Electric-of-service regulation to market-oriented environments for many U.S. electric generating plants. Our estimates of input their wholesale electricity markets improved the most. The results suggest modest medium-term efficiency benefits

Kammen, Daniel M.

171

A demand responsive bidding mechanism with price elasticity matrix in wholesale electricity pools  

E-Print Network [OSTI]

In the past several decades, many demand-side participation features have been applied in the electricity power systems. These features, such as distributed generation, on-site storage and demand response, add uncertainties ...

Wang, Jiankang, Ph. D. Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

172

A new wholesale bidding mechanism for enhanced demand response in smart grids  

E-Print Network [OSTI]

Calls to improve customer participation as a key element of smart grids have reinvigorated interest in demand-side features such as distributed generation, on-site storage and demand response. In the context of deregulated ...

Wang, Jiankang

173

A critique of an internship program conducted at a wholesale nursery company and recommendations for enhancing internship programs in the College of Agriculture and Life Sciences at Texas A & M University  

E-Print Network [OSTI]

Record of Study A CRITIQUE OF AN IMTEEWSHXP PROGRAM CONDUCTED AT A WHOLESALE NURSERY CONPANY AND RECOMMENDATIONS FOR ENHANCING X~HIP PROGRAMS XN THE COLLEGE OF AGRICULTURE AND LIFE SCIENCES AT TEXAS A & M UNIVERSITY A PROFESSIONAL PAPER Nary... is becoming more valuable. The sponsorship of a student's intern program can become a vital part of his educational process. A critique of a wholesale nursery company's internship program is examined through the participation of five students. Interviews...

Arrington, Mary Margaret

1990-01-01T23:59:59.000Z

174

New wholesale power market design using linked forward markets : a study for the DOE energy storage systems program.  

SciTech Connect (OSTI)

This report proposes a reformulation of U.S. ISO/RTO-managed wholesale electric power mar- kets for improved reliability and e ciency of system operations. Current markets do not specify or compensate primary frequency response. They also unnecessarily limit the participation of new technologies in reserve markets and o er insu cient economic inducements for new capacity invest- ment. In the proposed market reformulation, energy products are represented as physically-covered rm contracts and reserve products as physically-covered call option contracts. Trading of these products is supported by a backbone of linked ISO/RTO-managed forward markets with planning horizons ranging from multiple years to minutes ahead. A principal advantage of this reformulation is that reserve needs can be speci ed in detail, and resources can o er the services for which they are best suited, without being forced to conform to rigid reserve product de nitions. This should improve the business case for electric energy storage and other emerging technologies to provide reserve. In addition, the facilitation of price discovery should help to ensure e cient energy/reserve procurement and adequate levels of new capacity investment.

Silva Monroy, Cesar Augusto; Loose, Verne William; Ellison, James F.; Elliott, Ryan Thomas; Byrne, Raymond Harry; Guttromson, Ross; Tesfatsion, Leigh S. [Iowa State University, Ames, IA

2013-04-01T23:59:59.000Z

175

Beam Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation InInformationCenterResearch HighlightsToolsBES ReportsExperimentBasicBeam Status Print mA

176

Effects of Temporal Wind Patterns on the Value of Wind-Generated Electricity in California and the Northwest  

E-Print Network [OSTI]

power system抯 load and wholesale market prices [7-11]; thisgeographical area on the wholesale market value or capacityMontana and Wyoming) with wholesale power prices and loads

Wiser, Ryan H

2008-01-01T23:59:59.000Z

177

Perturbation Analysis of the Wholesale Energy Market Equilibrium in the Presence of Renewables  

E-Print Network [OSTI]

One of the main challenges in the emerging smart grid is the integration of renewable energy resources (RER). The latter introduces both intermittency and uncertainty into the grid, both of which can affect the underlying energy market. An interesting concept that is being explored for mitigating the integration cost of RERs is Demand Response. Implemented as a time-varying electricity price in real-time, Demand Response has a direct impact on the underlying energy market as well. Beginning with an overall model of the major market participants together with the constraints of transmission and generation, we analyze the energy market in this paper and derive conditions for global maximum using standard KKT criteria. The effect of uncertainties in the RER on the market equilibrium is then quantified, with and without real-time pricing. Perturbation analysis methods are used to compare the equilibria in the nominal and perturbed markets. These markets are also analyzed using a game-theoretic point of view. Suff...

Kiani, Arman

2012-01-01T23:59:59.000Z

178

Contrasts in restructuring wholesale electric markets: England/Wales, California, and the PJM  

SciTech Connect (OSTI)

The ways in which the British, the Californians, and the members of the Pennsylvania-Jersey-Maryland Pool (PJM) are restructuring their electric industries and designing markets provide fascinating political and technical contrasts with each other, particularly insofar as all three markets are roughly the same size, with energy sales of about 250--300 terawatt hours (TWh) annually. There have been significant differences in the drivers of change, objectives, and leadership, the legacies of the past, and the process of design, which are discussed in the first three sections. The fourth section describes the market designs in England and Wales, California, and the PJM, while the concluding section draws out the lessons of experience. While these lessons include specific principles regarding the objectives and structure of power exchanges, the maintenance of system stability and power transport, and the achieving of generation reliability, they also include several overarching conclusions. Perhaps chief among them, as will be clear from the discussion of the restructuring experience on both sides of the Atlantic, is that major restructurings can only be led by a public authority and will be successful in implementation only if that authority has a clear and realistic vision of where it wants to go.

Henney, A.

1998-08-01T23:59:59.000Z

179

Open Automated Demand Response Communications in Demand Response for Wholesale Ancillary Services  

SciTech Connect (OSTI)

The Pacific Gas and Electric Company (PG&E) is conducting a pilot program to investigate the technical feasibility of bidding certain demand response (DR) resources into the California Independent System Operator's (CAISO) day-ahead market for ancillary services nonspinning reserve. Three facilities, a retail store, a local government office building, and a bakery, are recruited into the pilot program. For each facility, hourly demand, and load curtailment potential are forecasted two days ahead and submitted to the CAISO the day before the operation as an available resource. These DR resources are optimized against all other generation resources in the CAISO ancillary service. Each facility is equipped with four-second real time telemetry equipment to ensure resource accountability and visibility to CAISO operators. When CAISO requests DR resources, PG&E's OpenADR (Open Automated DR) communications infrastructure is utilized to deliver DR signals to the facilities energy management and control systems (EMCS). The pre-programmed DR strategies are triggered without a human in the loop. This paper describes the automated system architecture and the flow of information to trigger and monitor the performance of the DR events. We outline the DR strategies at each of the participating facilities. At one site a real time electric measurement feedback loop is implemented to assure the delivery of CAISO dispatched demand reductions. Finally, we present results from each of the facilities and discuss findings.

Kiliccote, Sila; Piette, Mary Ann; Ghatikar, Girish; Koch, Ed; Hennage, Dan; Hernandez, John; Chiu, Albert; Sezgen, Osman; Goodin, John

2009-11-06T23:59:59.000Z

180

Customer response to day-ahead wholesale market electricity prices: Case study of RTP program experience in New York  

SciTech Connect (OSTI)

There is growing interest in policies, programs and tariffs that encourage customer loads to provide demand response (DR) to help discipline wholesale electricity markets. Proposals at the retail level range from eliminating fixed rate tariffs as the default service for some or all customer groups to reinstituting utility-sponsored load management programs with market-based inducements to curtail. Alternative rate designs include time-of-use (TOU), day-ahead real-time pricing (RTP), critical peak pricing, and even pricing usage at real-time market balancing prices. Some Independent System Operators (ISOs) have implemented their own DR programs whereby load curtailment capabilities are treated as a system resource and are paid an equivalent value. The resulting load reductions from these tariffs and programs provide a variety of benefits, including limiting the ability of suppliers to increase spot and long-term market-clearing prices above competitive levels (Neenan et al., 2002; Boren stein, 2002; Ruff, 2002). Unfortunately, there is little information in the public domain to characterize and quantify how customers actually respond to these alternative dynamic pricing schemes. A few empirical studies of large customer RTP response have shown modest results for most customers, with a few very price-responsive customers providing most of the aggregate response (Herriges et al., 1993; Schwarz et al., 2002). However, these studies examined response to voluntary, two-part RTP programs implemented by utilities in states without retail competition.1 Furthermore, the researchers had limited information on customer characteristics so they were unable to identify the drivers to price response. In the absence of a compelling characterization of why customers join RTP programs and how they respond to prices, many initiatives to modernize retail electricity rates seem to be stymied.

Goldman, C.; Hopper, N.; Sezgen, O.; Moezzi, M.; Bharvirkar, R.; Neenan, B.; Boisvert, R.; Cappers, P.; Pratt, D.

2004-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

A Regional Approach to Market Monitoring in the West  

E-Print Network [OSTI]

in California's Wholesale Electricity Industry, AmericanCommission (CPUC) 2002. Wholesale Generator InvestigationBehavior in California抯 Wholesale Electricity Market during

Barmack, Matthew; Kahn, Edward; Tierney, Susan; Goldman, Charles

2006-01-01T23:59:59.000Z

182

Uncertainties in the Value of Bill Savings from Behind-the-Meter, Residential Photovoltaic Systems: The Roles of Electricity Market Conditions, Retail Rate Design, and Net Metering  

E-Print Network [OSTI]

s PV generation in hour h, ? is wholesale price in hourload purchased in the wholesale market in hour h,economic value in wholesale energy markets. Progress in

Darghouth, Naim Richard

2013-01-01T23:59:59.000Z

183

COMBUSTION-GENERATED INDOOR AIR POLLUTION  

E-Print Network [OSTI]

The Status of Indoor Air Pollution Research 1976. GeometNovakov, T. : Formation of Pollution Particulate NitrogenGENERATED INDOOR AIR POLLUTION Dr. C. D. Hollowell, Dr. R.

Hollowell, C.D.

2010-01-01T23:59:59.000Z

184

Feasibility of Wholesale Electricity Competition in a Developing Country: Insights from Simulating a Market in Maharashtra State, India  

E-Print Network [OSTI]

cost of power from diesel based generation is almost doublediesel- based power plants (CII, 2005), the marginal cost of power generation

Phadke, Amol

2007-01-01T23:59:59.000Z

185

Feasibility of Wholesale Electricity Competition in a Developing Country: Insights from Simulating a Market in Maharashtra State, India  

E-Print Network [OSTI]

consumers. Appendix IV: Hydro Generation and the SeasonalIV 1 shows the peak demand, the residual peak demand (obtained after subtracting hydro generation

Phadke, Amol

2007-01-01T23:59:59.000Z

186

Static Checking of Dynamically Generated Queries in Database Applications Carl Gould, Zhendong Su, and Premkumar Devanbu  

E-Print Network [OSTI]

, WHOLESALE, and TYPE, among others. The RETAIL and WHOLESALE columns are both of type in- teger, indicatingBound != null) { query += "WHOLESALE > " + lowerBound + " AND "; } query += "TYPE IN (" + get to be executed is: SELECT '$' || (RETAIL/100) FROM INVENTORY WHERE WHOLESALE > 595 AND TYPE IN (SELECT TY

Devanbu, Prem

187

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

E-Print Network [OSTI]

utility system, and may therefore include wholesale distributed generationutility system, and therefore includes a number of rooftop wholesale distributed generation

Darghouth, Naim

2012-01-01T23:59:59.000Z

188

Heuristic status polling  

DOE Patents [OSTI]

Methods, compute nodes, and computer program products are provided for heuristic status polling of a component in a computing system. Embodiments include receiving, by a polling module from a requesting application, a status request requesting status of a component; determining, by the polling module, whether an activity history for the component satisfies heuristic polling criteria; polling, by the polling module, the component for status if the activity history for the component satisfies the heuristic polling criteria; and not polling, by the polling module, the component for status if the activity history for the component does not satisfy the heuristic criteria.

Archer, Charles J. (Rochester, MN); Blocksome, Michael A. (Rochester, MN); Heidelberger, Philip (Cortlandt Manor, NY); Kumar, Sameer (White Plains, NY); Parker, Jeffrey J. (Rochester, MN); Ratterman, Joseph D. (Rochester, MN)

2011-06-07T23:59:59.000Z

189

Certification Status Search Tool  

E-Print Network [OSTI]

Certification Status Search Tool (SB/DVBE) Illustrated User Manual #12;2 Certification Status Search Tool (SB/DVBE) Rev. 5/14/09 Copyright 漏 2008 RFP Depot, LLC dba BidSync All Rights Reserved://www.bidsync.com #12;3 Certification Status Search Tool (SB/DVBE) Rev. 5/14/09 Introduction BidSync is a powerful e

190

Status | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage 禄 SearchEnergyDepartmentScopingOverviewFranklinStatus Status Status More

191

Monthly Nuclear Utility Generation by State and Reactor, 2007  

U.S. Energy Information Administration (EIA) Indexed Site

applicationvnd.ms-excel X-Translator-Status: translating " Worksheet" "Monthly Nuclear Utility Generation by State and Reactor, 2007" "January through December 2007"...

192

Monthly Nuclear Utility Generation by State and Reactor, 2004  

U.S. Energy Information Administration (EIA) Indexed Site

applicationvnd.ms-excel X-Translator-Status: translating " Worksheet" "Monthly Nuclear Utility Generation by State and Reactor, 2004" "January through December 2004"...

193

Monthly Nuclear Utility Generation by State and Reactor, 2005  

U.S. Energy Information Administration (EIA) Indexed Site

applicationvnd.ms-excel X-Translator-Status: translating " Worksheet" "Monthly Nuclear Utility Generation by State and Reactor, 2005" "January through December 2005"...

194

Monthly Nuclear Utility Generation by State and Reactor, 2003  

U.S. Energy Information Administration (EIA) Indexed Site

applicationvnd.ms-excel X-Translator-Status: translating " Worksheet" "Monthly Nuclear Utility Generation by State and Reactor, 2003" "January through December 2003"...

195

Monthly Nuclear Utility Generation by State and Reactor, 2008  

U.S. Energy Information Administration (EIA) Indexed Site

applicationvnd.ms-excel X-Translator-Status: translating " Worksheet" "Monthly Nuclear Utility Generation by State and Reactor, 2008" "January through December 2008"...

196

Investment under Regulatory Uncertainty: U.S. Electricity Generation Investment Since 1996  

E-Print Network [OSTI]

Roberts, President & CEO, Entergy Wholesale Operations, U.S.Mission Energy EPG (Entergy Power Group) GPU International

Ishii, Jun; Yan, Jingming

2004-01-01T23:59:59.000Z

197

Diophantine Generation,  

E-Print Network [OSTI]

Diophantine Generation, Horizontal and Vertical Problems, and the Weak Vertical Method Alexandra Shlapentokh Diophantine Sets, Definitions and Generation Diophantine Sets Diophantine Generation Properties of Diophantine Generation Diophantine Family of Z Diophantine Family of a Polynomial Ring Going Down Horizontal

Shlapentokh, Alexandra

198

REGULATORY STATUS: AOC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

184 UNIT NAME: Concrete Rubble pile 129) REGULATORY STATUS: AOC LOCATION: Outside plant security south of C-611 Water Treatment Plant. Estimated to be less than 5 cubic feet....

199

Small Business Status  

Broader source: Energy.gov (indexed) [DOE]

Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a...

200

Smart Grid Status and Metrics Report Appendices  

SciTech Connect (OSTI)

A smart grid uses digital power control and communication technology to improve the reliability, security, flexibility, and efficiency of the electric system, from large generation through the delivery systems to electricity consumers and a growing number of distributed generation and storage resources. To convey progress made in achieving the vision of a smart grid, this report uses a set of six characteristics derived from the National Energy Technology Laboratory Modern Grid Strategy. The Smart Grid Status and Metrics Report defines and examines 21 metrics that collectively provide insight into the grid抯 capacity to embody these characteristics. This appendix presents papers covering each of the 21 metrics identified in Section 2.1 of the Smart Grid Status and Metrics Report. These metric papers were prepared in advance of the main body of the report and collectively form its informational backbone.

Balducci, Patrick J.; Antonopoulos, Chrissi A.; Clements, Samuel L.; Gorrissen, Willy J.; Kirkham, Harold; Ruiz, Kathleen A.; Smith, David L.; Weimar, Mark R.; Gardner, Chris; Varney, Jeff

2014-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

1. Generation 1 1. Generation  

E-Print Network [OSTI]

1. Generation 1 _________________________________________________________________________ 1. Generation Sound and vibrations or, in more general terms, oscillations of matter (solids or fluids) are generated in many different dynamic processes. The basic mechanisms which underlie these oscillations

Berlin,Technische Universit盲t

202

Genepool Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr Flickr Editor'sshort version) ThelongEmailStatus Updates and Status

203

CONSULTANT REPORT INTEGRATED TRANSMISSION AND  

E-Print Network [OSTI]

OF DISTRIBUTED WHOLESALE PHOTOVOLTAIC GENERATION Prepared for: California Energy Commission Prepared electric power sources strains existing processes to safely interconnect wholesale distributed resources the Energynet庐 simulation tool to assess the regional impacts of wholesale photovoltaic generation

204

Status Report 2004 2007  

E-Print Network [OSTI]

Status Report 2004 颅 2007 Remote SenSing and atmoSpheRic phySicS foR an efficient USe of Renewable: left: Solar and wind power supply of the `Energielabor' at Oldenburg University. center left: Net Priorities 8 overview of current Research topics 8 grid integration of large Shares of Solar and wind power 9

Heinemann, Detlev

205

TEMPO Status Kelly Chance  

E-Print Network [OSTI]

TEMPO Status Kelly Chance AQAST 7 meeting June 17, 2014 #12;Hourly atmospheric pollution from collaboration: Korea, Europe, Canada, Mexico Selected Nov. 2012 as NASA's first Earth Venture Instrument in tropospheric ozone and aerosol pollution 路 Exploits extensive measurement heritage from LEO missions

Chance, Kelly

206

Space Shuttle Program Status  

E-Print Network [OSTI]

1 Space Shuttle Program Status John Casper Associate Manager Space Shuttle Program September 13, 2010 NAC Space Operations Committee #12;2 Operations #12;3 Flown Manifest March 2009 May 2010 #12, 2010 132nd Space Shuttle mission 32nd Flight of Atlantis (120,650,907 statute miles) 294 Total

Waliser, Duane E.

207

Status of JUPITER Program  

SciTech Connect (OSTI)

To obtain the data necessary for evaluating the nuclear design method of a large-scale fast breeder reactor, criticality tests with a large- scale homogeneous reactor were conducted as part of a joint research program by Japan and the U.S. Analyses of the tests are underway in both countries. The purpose of this paper is to describe the status of this project.

Inoue, T.; Shirakata, K.; Kinjo, K.; Ikegami, T.; Yamamoto, M.

1981-03-10T23:59:59.000Z

208

SuperNEMO status  

SciTech Connect (OSTI)

The SuperNEMO experiment aims to reach a sensitivity up to 10{sup 26} years on the half-life of neutrinoless double beta decay. The SuperNEMO project strongly inherits from the previous Nemo3 experiment. It will consist of a ''tracko-calo'' modular detector with at least 100 kg of betabeta isotope. The current status of the main R and D tasks will be presented: enrichment and production of source foils, radiopurity control, tracker and calorimeter.

Chapon, A. [Universite de Caen Basse-Normandie, ENSICAEN, LPC Caen, UMR 6534, 6 boulevard du Marechal Juin, 14050 CAEN Cedex (France); Collaboration: SUPERNEMO Collaboration

2011-12-16T23:59:59.000Z

209

Distributed Generation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

come a long way in addressing interconnection standards for distributed generation, utilities have largely overlooked the untapped potential of these resources. Under certain...

210

Next Generation Nuclear Plant Project 2009 Status Report  

SciTech Connect (OSTI)

The mission of the NGNP Project is to broaden the environmental and economic benefits of nuclear energy technology to the United States and other economies by demonstrating its applicability to market sectors not served by light water reactors (LWRs). Those markets typically use fossil fuels to fulfill their energy needs, and high temperature gas-cooled reactors (HTGRs) like the NGNP can reduce this dependence and the resulting carbon footprint.

Larry Demick; Jim Kinsey; Keith Perry; Dave Petti

2010-05-01T23:59:59.000Z

211

Monte Carlos of the new generation: status and progress  

SciTech Connect (OSTI)

Standard parton shower monte carlos are designed to give reliable descriptions of low-pT physics. In the very high-energy regime of modern colliders, this is may lead to largely incorrect predictions of the basic reaction processes. This motivated the recent theoretical efforts aimed at improving monte carlos through the inclusion of matrix elements computed beyond the leading order in QCD. I briefly review the progress made, and discuss bottom production at the Tevatron.

Frixione, Stefano [INFN, Sezione di Genova, Via Dodecaneso 33, 16146 Genova (Italy)

2005-03-22T23:59:59.000Z

212

Status of Segmented Element Thermoelectric Generator for Vehicle...  

Broader source: Energy.gov (indexed) [DOE]

ring which includes TE elements Advanced Thermoelectric Solutions - 10 - Liquid tanks are attached at each end of the TEG. The cooling liquid flows counter to the flow of...

213

Status of Segmented Element Thermoelectric Generator for Vehicle Waste Heat  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage 禄 SearchEnergyDepartmentScopingOverviewFranklin M.EngineReportRecovery |

214

Status of the WIPP Project  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been constructed to be a repository for transuranic (TRU) radioactive wastes generated from the US defense activities. In order to use WIPP as a repository for permanent disposal of TRU waste, the US Department of Energy (DOE) has to demonstrate compliance with the Standards for the Management and Disposal of Spent Nuclear Fuel, High Level and Transuranic Radioactive Wastes'' promulgated by the US Environmental Protection Agency (EPA) in the US Code of Federal Regulations 40 CFR Part 191. The DOE initially plans to perform experiments with a small quantity of waste at WIPP and would like to bring additional quantities for operational demonstration'', before determining whether WIPP is to be a repository for permanent disposal. There are serious problems in pursuing this course of action from an operational point of view. It would be wiser to take the actions necessary to decide whether the facility should be used as a permanent repository, before emplacing a substantial quantity of waste in it. This report evaluates the status of the WIPP Project as of February 1991. 22 refs.

Neill, R.H.; Chaturvedi, L.

1991-01-01T23:59:59.000Z

215

CHEF: a status report  

SciTech Connect (OSTI)

CHEF refers both to a framework and to an interactive application emphasizing accelerator optics calculations. The framework supports multiple domains of applications: e.g. nonlinear analysis, perturbation theory, and tracking. Its underlying philosophy is to provide an infrastructure with minimum hidden implicit assumptions, general enough to facilitate both routine and specialized computational tasks, and to minimize the duplication of necessary, complex bookkeeping tasks. CHEF was already described in recent conferences. This paper is a status report on recent developments, including issues related to applications to high energy linacs.

Ostiguy, J.-F.; Michelotti, L.; /Fermilab

2007-06-01T23:59:59.000Z

216

Status of Climate Change  

E-Print Network [OSTI]

Status of Climate Change 2013 CaTee Conference San Antonio 2013 ESL-KT-13-12-56 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Menu for Today IPCC 2013: Assessment Report #5 Facts about Climate Change... Who will Win, Who will Lose What Needs to be Done ESL-KT-13-12-56 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 IPCC #5 No great surprises - Sharper language Uncertainties are still large Essentially...

North, G.

2013-01-01T23:59:59.000Z

217

Model Validation Status Review  

SciTech Connect (OSTI)

The primary objective for the Model Validation Status Review was to perform a one-time evaluation of model validation associated with the analysis/model reports (AMRs) containing model input to total-system performance assessment (TSPA) for the Yucca Mountain site recommendation (SR). This review was performed in response to Corrective Action Request BSC-01-C-01 (Clark 2001, Krisha 2001) pursuant to Quality Assurance review findings of an adverse trend in model validation deficiency. The review findings in this report provide the following information which defines the extent of model validation deficiency and the corrective action needed: (1) AMRs that contain or support models are identified, and conversely, for each model the supporting documentation is identified. (2) The use for each model is determined based on whether the output is used directly for TSPA-SR, or for screening (exclusion) of features, events, and processes (FEPs), and the nature of the model output. (3) Two approaches are used to evaluate the extent to which the validation for each model is compliant with AP-3.10Q (Analyses and Models). The approaches differ in regard to whether model validation is achieved within individual AMRs as originally intended, or whether model validation could be readily achieved by incorporating information from other sources. (4) Recommendations are presented for changes to the AMRs, and additional model development activities or data collection, that will remedy model validation review findings, in support of licensing activities. The Model Validation Status Review emphasized those AMRs that support TSPA-SR (CRWMS M&O 2000bl and 2000bm). A series of workshops and teleconferences was held to discuss and integrate the review findings. The review encompassed 125 AMRs (Table 1) plus certain other supporting documents and data needed to assess model validity. The AMRs were grouped in 21 model areas representing the modeling of processes affecting the natural and engineered barriers, plus the TSPA model itself Description of the model areas is provided in Section 3, and the documents reviewed are described in Section 4. The responsible manager for the Model Validation Status Review was the Chief Science Officer (CSO) for Bechtel-SAIC Co. (BSC). The team lead was assigned by the CSO. A total of 32 technical specialists were engaged to evaluate model validation status in the 21 model areas. The technical specialists were generally independent of the work reviewed, meeting technical qualifications as discussed in Section 5.

E.L. Hardin

2001-11-28T23:59:59.000Z

218

Hopper Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr FlickrGuidedCH2MLLC HistoryVeterans | Updates and Status Current

219

Euclid Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4:Epitaxial Thin Film XRD EpitaxialProgrammingStatus Updates and

220

National Spherical Torus Experiment Upgrade Status and Plans*  

E-Print Network [OSTI]

fusion nuclear environment of copious neutrons to develop an experimental database on: 颅 Nuclear is unique challenge for ST-based Fusion Nuclear Science Facility 路 NSTX-U goals: 颅 Generate ~0.3-0.4MA fullNational Spherical Torus Experiment Upgrade 颅 Status and Plans* J. Menard, PPPL For the NSTX-U Team

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Risk Framework for the Next Generation Nuclear Power Plant Construction  

E-Print Network [OSTI]

sector projects, and recently elevated to Best Practice status. However, its current format is inadequate to address the unique challenges of constructing the next generation of nuclear power plants (NPP). To understand and determine the risks...

Yeon, Jaeheum 1981-

2012-12-11T23:59:59.000Z

222

Thermoelectric Generators 1. Thermoelectric generator  

E-Print Network [OSTI]

. Cold Hot I - -- - - - - -- Figure 1 Electron concentration in a thermoelectric material. #12;2 A large1 Thermoelectric Generators HoSung Lee 1. Thermoelectric generator 1.1 Basic Equations In 1821 on the direction of current and material [3]. This is called the Thomson effect (or Thomson heat). These three

Lee, Ho Sung

223

PROVOST CHALLENGE OVERVIEW STATUS REPORT  

E-Print Network [OSTI]

PROVOST CHALLENGE OVERVIEW STATUS REPORT December 2013 # Project Status Project Name 路 Project Lead report) Joyce O'Halloran and Rachel Webb, The Fariborz Maseeh Department of Mathematics and Statistics 54 ON SCHEDULE Online Academic Advising & Career Development Modules. (Link to detailed report) Mary Ann Barham

Lafferriere, Gerardo

224

Qualification Status List (QSL Package)  

E-Print Network [OSTI]

qualification of Array B. These open items are summarized on page 2 and the equipment subsections which follow#12;ALSEP Qualification Status List (QSL Package) Flight 3 Configuration #12;NO. ltiY. NO. RI!V. NO. Qualification Status List ALSEP Array B Configuration 1. 0 INTRODUCTION ATM 825 PAGI! 1

Rathbun, Julie A.

225

Tools for event generator tuning and validation  

E-Print Network [OSTI]

I describe the current status of MCnet tools for validating the performance of event generator simulations against data, and for tuning their phenomenological free parameters. For validation, the Rivet toolkit is now a mature and complete system, with a large library of prominent benchmark analyses. For tuning, the Professor system has recently completed its first tunes of Pythia 6, with substantial improvements on the existing default tune and potential to greatly aid the setup of new generators for LHC studies.

Andy Buckley

2008-09-26T23:59:59.000Z

226

Microwave generator  

DOE Patents [OSTI]

A microwave generator is provided for generating microwaves substantially from virtual cathode oscillation. Electrons are emitted from a cathode and accelerated to an anode which is spaced apart from the cathode. The anode has an annular slit there through effective to form the virtual cathode. The anode is at least one range thickness relative to electrons reflecting from the virtual cathode. A magnet is provided to produce an optimum magnetic field having the field strength effective to form an annular beam from the emitted electrons in substantial alignment with the annular anode slit. The magnetic field, however, does permit the reflected electrons to axially diverge from the annular beam. The reflected electrons are absorbed by the anode in returning to the real cathode, such that substantially no reflexing electrons occur. The resulting microwaves are produced with a single dominant mode and are substantially monochromatic relative to conventional virtual cathode microwave generators. 6 figs.

Kwan, T.J.T.; Snell, C.M.

1987-03-31T23:59:59.000Z

227

Spiro D Alexandratos, Status Discussion | U.S. DOE Office of...  

Office of Science (SC) Website

positive commentary on the value of the meeting and the manner in which it was carried out. Before wholesale changes are considered, one might want to bear these comments in mind....

228

Status of MICE  

SciTech Connect (OSTI)

The Muon Ionization Cooling Experiment (MICE) is an experiment currently under construction at the Rutherford Appleton Laboratory (RAL) in the UK. The aim of the experiment is to demonstrate the concept of ionization cooling for a beam of muons, crucial for the requirements of a Neutrino Factory and a Muon Collider. Muon cooling is achieved by measuring the reduction of the four dimensional transverse emittance for a beam of muons passing through low density absorbers and then accelerating the longitudinal component of the momentum using RF cavities. The absorbers are maintained in a focusing magnetic field to reduce the beta function of the beam and the RF cavities are kept inside coupling coils. The main goal of MICE is to measure a fractional drop in emittance, of order -10% for large emittance beams, with an accuracy of 1%(which imposes a requirement that the absolute emittance be measured with an accuracy of 0.1%). This paper will discuss the status of MICE, including the progress in commissioning the muon beam line at the ISIS accelerator at RAL, the construction of the different detector elements in MICE and the prospects for the future.

Soler, F. J. P. [University of Glasgow, Glasgow G12 8QQ (United Kingdom)

2010-03-30T23:59:59.000Z

229

ANAIS: Status and prospects  

E-Print Network [OSTI]

ANAIS experiment will look for dark matter annual modulation with large mass of ultra-pure NaI(Tl) scintillators at the Canfranc Underground Laboratory (LSC), aiming to confirm the DAMA/LIBRA positive signal in a model-independent way. Two 12.5 kg each NaI(Tl) crystals provided by Alpha Spectra are currently taking data at the LSC. Present status of ANAIS detectors background and general performance is summarized; in particular, thanks to the high light collection efficiency prospects of lowering the threshold down to 1 keVee are reachable. Crystal radiopurity goals are fulfilled for $^{232}$Th and $^{238}$U chains and $^{40}$K activity, although higher than original goal, could be accepted; however, high $^{210}$Pb contamination out-of-equilibrium has been identified. More radiopure detectors are being built by Alpha Spectra. The ongoing high quantum efficiency PMT tests and muon veto characterization are also presented. Finally, the sensitivity of the experiment for the annual modulation in the WIMP signal,...

Amar, Julio; Cuesta, Clara; Garc韆, Eduardo; Ginestra, Carlos; Mart韓ez, Mar韆; Oliv醤, Miguel A; Ortigoza, Ysrael; de Sol髍zano, Alfonso Ort韟; Pobes, Carlos; Puimed髇, Jorge; Sarsa, Mar韆 Luisa; Villar, Jos 羘gel; Villar, Patricia

2015-01-01T23:59:59.000Z

230

GSFC flywheel status  

SciTech Connect (OSTI)

The assessment of flywheel energy storage for spacecraft power system is based on the conceptual flywheel design. This conceptual design of an integrated flywheel is based on the Mechanical Capacitor which evolved from development of magnetic bearings and permanent magnet ironless-brushless DC motors. The mechanical capacitor is based on three key technologies: (1) a composite rotor with a low ID to OD ratio for high energy density (weight and volume) (2) magnetic suspension close to the geometric center of the rotating mass to minimize loads normally encountered on the ends of a shaft, a no-wear mechanism in a vacuum environment, and to minimize losses at high rotational speeds (3) permanent magnet ironless-brushless DC motor/generator for high efficiency of conversion and low losses at high rotational speeds. The complete system would include the necessary electronics for the motor/generator, containment, and counterrotating wheels for attitude control compatibility.

Rodriguez, G.E.

1983-12-01T23:59:59.000Z

231

NGNP Engineering Status  

SciTech Connect (OSTI)

The objectives of Phase 1 Engineering and Design scope are to: 1) complete the initial design activities for a prototype nuclear reactor and plant that is capable of co-generating electricity, hydrogen, and process heat; 2) identify technological aspects of the NGNP that need further advancement by research and development activities; and 3) provide engineering support to the early licensing process, including technical input to white papers and developing the basis for future safety analyses.

John Collins

2010-08-01T23:59:59.000Z

232

Fusion technology status and requirements  

SciTech Connect (OSTI)

This paper summarizes the status of fusion technology and discusses the requirements to be met in order to build a demonstration fusion plant. Strategies and programmatic considerations in pursuing engineering feasibility are also outlined.

Thomassen, K.I.

1982-01-26T23:59:59.000Z

233

Status of Oregon's Bull Trout.  

SciTech Connect (OSTI)

Limited historical references indicate that bull trout Salvelinus confluentus in Oregon were once widely spread throughout at least 12 basins in the Klamath River and Columbia River systems. No bull trout have been observed in Oregon's coastal systems. A total of 69 bull trout populations in 12 basins are currently identified in Oregon. A comparison of the 1991 bull trout status (Ratliff and Howell 1992) to the revised 1996 status found that 7 populations were newly discovered and 1 population showed a positive or upgraded status while 22 populations showed a negative or downgraded status. The general downgrading of 32% of Oregon's bull trout populations appears largely due to increased survey efforts and increased survey accuracy rather than reduced numbers or distribution. However, three populations in the upper Klamath Basin, two in the Walla Walla Basin, and one in the Willamette Basin showed decreases in estimated population abundance or distribution.

Buchanan, David V.; Hanson, Mary L.; Hooton, Robert M.

1997-10-01T23:59:59.000Z

234

Generation Technologies  

E-Print Network [OSTI]

Many local governments are using green power in their facilities and providing assistance to local businesses and residents to do the same. Green power is a subset of renewable energy that is produced with no GHG emissions, typically from solar, wind, geothermal, biogas, biomass, or low-impact small hydroelectric sources, includes three types of products: utility products (i.e., green power purchased from the utility through the electricity grid), renewable energy certificates (RECs), and on-site generation. Opportunities to purchase these products are increasing significantly, with annual green power market growth rates

Green Power

2005-01-01T23:59:59.000Z

235

Status of MICE  

SciTech Connect (OSTI)

Muon ionization cooling is the only practical method for preparing high-brilliance beams needed for a neutrino factory or muon collider. The muon ionization cooling experiment (MICE) under development at the Rutherford Appleton Laboratory comprises a dedicated beamline to generate a range of input emittance and momentum, with time-of-flight and Cherenkov detectors to ensure a pure muon beam. A first measurement of emittance is performed in the upstream magnetic spectrometer with a scintillating-fiber tracker. A cooling cell will then follow, alternating energy loss in liquid hydrogen with RF acceleration. A second spectrometer identical to the first and a particle identification system will measure the outgoing emittance. Plans for measurements of emittance and cooling are described.

Bross, A.D.; /Fermilab; Kaplan, D.M.; / /IIT, Chicago

2008-11-01T23:59:59.000Z

236

GASIFICATION FOR DISTRIBUTED GENERATION  

SciTech Connect (OSTI)

A recent emphasis in gasification technology development has been directed toward reduced-scale gasifier systems for distributed generation at remote sites. The domestic distributed power generation market over the next decade is expected to be 5-6 gigawatts per year. The global increase is expected at 20 gigawatts over the next decade. The economics of gasification for distributed power generation are significantly improved when fuel transport is minimized. Until recently, gasification technology has been synonymous with coal conversion. Presently, however, interest centers on providing clean-burning fuel to remote sites that are not necessarily near coal supplies but have sufficient alternative carbonaceous material to feed a small gasifier. Gasifiers up to 50 MW are of current interest, with emphasis on those of 5-MW generating capacity. Internal combustion engines offer a more robust system for utilizing the fuel gas, while fuel cells and microturbines offer higher electric conversion efficiencies. The initial focus of this multiyear effort was on internal combustion engines and microturbines as more realistic near-term options for distributed generation. In this project, we studied emerging gasification technologies that can provide gas from regionally available feedstock as fuel to power generators under 30 MW in a distributed generation setting. Larger-scale gasification, primarily coal-fed, has been used commercially for more than 50 years to produce clean synthesis gas for the refining, chemical, and power industries. Commercial-scale gasification activities are under way at 113 sites in 22 countries in North and South America, Europe, Asia, Africa, and Australia, according to the Gasification Technologies Council. Gasification studies were carried out on alfalfa, black liquor (a high-sodium waste from the pulp industry), cow manure, and willow on the laboratory scale and on alfalfa, black liquor, and willow on the bench scale. Initial parametric tests evaluated through reactivity and product composition were carried out on thermogravimetric analysis (TGA) equipment. These tests were evaluated and then followed by bench-scale studies at 1123 K using an integrated bench-scale fluidized-bed gasifier (IBG) which can be operated in the semicontinuous batch mode. Products from tests were solid (ash), liquid (tar), and gas. Tar was separated on an open chromatographic column. Analysis of the gas product was carried out using on-line Fourier transform infrared spectroscopy (FT-IR). For selected tests, gas was collected periodically and analyzed using a refinery gas analyzer GC (gas chromatograph). The solid product was not extensively analyzed. This report is a part of a search into emerging gasification technologies that can provide power under 30 MW in a distributed generation setting. Larger-scale gasification has been used commercially for more than 50 years to produce clean synthesis gas for the refining, chemical, and power industries, and it is probable that scaled-down applications for use in remote areas will become viable. The appendix to this report contains a list, description, and sources of currently available gasification technologies that could be or are being commercially applied for distributed generation. This list was gathered from current sources and provides information about the supplier, the relative size range, and the status of the technology.

Ronald C. Timpe; Michael D. Mann; Darren D. Schmidt

2000-05-01T23:59:59.000Z

237

OPTIONS TO MANAGE RISKS IN GENERATION Jos L. Arriagada Hugh Rudnick  

E-Print Network [OSTI]

deregulation, risk management, options, market risks, futures, energy prices. I. INTRODUCTION The restructuring new regulations, is the electrical wholesale market. However, there has not been unanimity to a single organization, the Pool, the tasks related to the system operation and the wholesale market

Catholic University of Chile (Universidad Cat贸lica de Chile)

238

Nuclear power generation and fuel cycle report 1996  

SciTech Connect (OSTI)

This report presents the current status and projections through 2015 of nuclear capacity, generation, and fuel cycle requirements for all countries using nuclear power to generate electricity for commercial use. It also contains information and forecasts of developments in the worldwide nuclear fuel market. Long term projections of U.S. nuclear capacity, generation, and spent fuel discharges for two different scenarios through 2040 are developed. A discussion on decommissioning of nuclear power plants is included.

NONE

1996-10-01T23:59:59.000Z

239

Advanced Collaborative Emissions Study (ACES): Phase 2 Status...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

: Phase 2 Status Report Advanced Collaborative Emissions Study (ACES): Phase 2 Status Report Discusses status of ACES, a cooperative multi-party effort to characterize emissions...

240

Thermoelectric generator  

SciTech Connect (OSTI)

A thermoelectric generator unit is described comprising: a hot side heat exchanger including a plate having extruded retention posts projecting from one surface of the plate, and fins adapted for contact with a heating source. The fins are positioned between two of the retention posts. Retention rods are inserted between the retention posts and the base of the fins to retain the fin in thermal contact with the plate surface upon insertion of the retention rod between the engaging surface of the post and the corresponding fin. Thermoelectric semi-conductor modules are in thermal contact with the opposite side of the hot side heat exchanger plate from the contact with the fins. The modules are arranged in a grid pattern so that heat flow is directed into each of the modules from the hot side heat exchanger. The modules are connected electrically so as to combine their electrical output; and a cold side heat exchanger is in thermal contact with the modules acting as a heat sink on the opposite side of the module from the hot side heat exchanger plate so as to produce a thermal gradient across the modules.

Shakun, W.; Bearden, J.H.; Henderson, D.R.

1988-03-29T23:59:59.000Z

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

RENEWABLES 2007 GLOBAL STATUS REPORT  

E-Print Network [OSTI]

RENEWABLES 2007 GLOBAL STATUS REPORT www.ren21.net #12;Renewable Energy Policy Network for the 21st renewable energy. It provides a forum for leadership and exchange in international policy processes. It bolsters appropriate policies that increase the wise use of renewable energies in developing

Kammen, Daniel M.

242

RENEWABLES 2005 GLOBAL STATUS REPORT  

E-Print Network [OSTI]

RENEWABLES 2005 GLOBAL STATUS REPORT Paper prepared for the REN21 Network by The Worldwatch Institute Lead Author: Eric Martinotwww.ren21.net #12;Renewable Energy Policy Network for the 21st Century REN21 is a global policy network aimed at providing a forum for international leadership on renewable

Kammen, Daniel M.

243

Hot gas particle filter systems: Commercialization status  

SciTech Connect (OSTI)

Integrated Gasification Combined Cycles (IGCCs) and Pressurized Circulating Fluidized Bed Cycles (PCFBs) are being developed and demonstrated for commercial power generation applications. Hot gas particulate filters (HGPFs) are key components for the successful implementation of advanced IGCC and PCFB power generation cycles. The objective is to develop and qualify through analysis and testing a practical HGPF system that meets the performance and operational requirements of PCFB and IGCC systems. This paper reports on the status of Westinghouse`s HGPF commercialization programs including: A quick summary of past gasification based HGPF test programs; A summary of the integrated HGPF operation at the American Electric Power, Tidd Pressurized Fluidized Bed Combustion (PFBC) Demonstration Project with approximately 6,000 hours of HGPF testing completed; A summary of approximately 3,200 hours of HGPF testing at the Foster Wheeler (FW) 10 MWe PCFB facility located in Karhula, Finland; A summary of over 700 hours of HGPF operation at the FW 2 MWe topping PCFB facility located in Livingston, New Jersey; A summary of the design of the HGPFs for the DOE/Southern Company Services, Power System Development Facility (PSDF) located in Wilsonville, Alabama; A summary of the design of the commercial-scale HGPF system for the Sierra Pacific, Pinon Pine IGCC Project; A review of completed testing and a summary of planned testing of Westinghouse HGPFs in Biomass IGCC applications; and A brief summary of the HGPF systems for the City of Lakeland, McIntosh Unit 4 PCFB Demonstration Project.

Morehead, H.T.; Adams, V.L. [Westinghouse Electric Corp., Orlando, FL (United States). Power Generation Business Unit; Yang, W.C.; Lippert, T.E. [Westinghouse Electric Corp., Pittsburgh, PA (United States). Science and Technology Center

1997-12-31T23:59:59.000Z

244

AGC-1 Post Irradiation Examination Status  

SciTech Connect (OSTI)

The Next Generation Nuclear Plant (NGNP) Graphite R&D program is currently measuring irradiated material property changes in several grades of nuclear graphite for predicting their behavior and operating performance within the core of new Very High Temperature Reactor (VHTR) designs. The Advanced Graphite Creep (AGC) experiment consisting of six irradiation capsules will generate this irradiated graphite performance data for NGNP reactor operating conditions. All six AGC capsules in the experiment will be irradiated in the Advanced Test Reactor (ATR), disassembled in the Hot Fuel Examination Facility (HFEF), and examined at the INL Research Center (IRC) or Oak Ridge National Laboratory (ORNL). This is the first in a series of status reports on the progress of the AGC experiment. As the first capsule, AGC1 was irradiated from September 2009 to January 2011 to a maximum dose level of 6-7 dpa. The capsule was removed from ATR and transferred to the HFEF in April 2011 where the capsule was disassembled and test specimens extracted from the capsules. The first irradiated samples from AGC1 were shipped to the IRC in July 2011and initial post irradiation examination (PIE) activities were begun on the first 37 samples received. PIE activities continue for the remainder of the AGC1 specimen as they are received at the IRC.

David Swank

2011-09-01T23:59:59.000Z

245

SNS Operating Status | ORNL Neutron Sciences  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Status Alerts Receive updates about the SNS beam status via text messages to your cell phone andor e-mail by signing up here. The instrument hall coordinators will communicate any...

246

Webinar: National Hydrogen Learning Demonstration Status  

Broader source: Energy.gov [DOE]

Video recording and text version of the webinar, "National Hydrogen Learning Demonstration Status," originally presented on February 6, 2012.

247

Introduction Minimal generation  

E-Print Network [OSTI]

Introduction Minimal generation Random generation Minimal and probabilistic generation of finite generation of finite groups #12;Introduction Minimal generation Random generation Some motivation Let x1 random elements of G = x1, . . . , xk . (G is the group generated by x1, . . . , xk : all possible

St Andrews, University of

248

3Compliance Status 2004 SITE ENVIRONMENTAL REPORT  

E-Print Network [OSTI]

3-1 3Compliance Status 2004 SITE ENVIRONMENTAL REPORT DRAFT Brookhaven National Laboratory (BNL County Department of Health Services. Thirty reportable spills of petroleum products or antifreeze status #12;3-22004 SITE ENVIRONMENTAL REPORT CHAPTER 3: COMPLIANCE STATUS DRAFT 3.2.2 New or Modified

249

Vertical Integration and Market Power in Electricity Markets Seamus Hogan  

E-Print Network [OSTI]

the resulting wholesale market risks, which risks are further exacerbated by competition. Such contracts markets with improved wholesale market risk management, but also reduced wholesale market power. This paper develops shares in wholesale and retail markets. In general, firms whose share of generating capacity is higher

Hickman, Mark

250

SuperNEMO Project Status  

SciTech Connect (OSTI)

The SuperNEMO experiment aims to reach a sensitivity up to 10{sup 26} years on the half-life of neutrinoless double beta decay. The chosen way is to build a 'tracko-calo' detector with at least 100 kg of betabeta isotope. The current status of the main R and D tasks will be presented: enrichment and production of source foil, radiopurity control, tracker and calorimeter.

Chauveau, E. [Universite de Bordeaux, Centre d'Etudes Nucleaires de Bordeaux Gradignan, UMR 5797, F-33175 Gradignan (France) and CNRS/IN2P3, Centre d'Etudes Nucleaires de Bordeaux Gradignan, UMR 5797, F-33175 Gradignan (France)

2009-11-09T23:59:59.000Z

251

Status Report on ILDG activities  

E-Print Network [OSTI]

A status report about the International Lattice Data Grid (ILDG) is given. Different countries participating in the ILDG have created regional lattice data grid solutions that are implemented, working and used. The remaining task and the focus of present activities is the development of the interoperability of these regional grids. A first, successful step in this direction is a metadata catalogue service which is already working interoperable.

Karl Jansen

2006-10-05T23:59:59.000Z

252

Next Generation Nuclear Plant Project Technology Development Roadmaps: The Technical Path Forward  

SciTech Connect (OSTI)

This document presents the Next Generation Nuclear Plant (NGNP) Systems, Subsystems, and Components, establishes a baseline for the current technology readiness status, and provides a path forward to achieve increasing levels of technical maturity.

John Collins

2009-01-01T23:59:59.000Z

253

Understanding and Managing Generation Y  

E-Print Network [OSTI]

There are four generations in the workplace today; they consist of the Silent Generation, Baby Boom Generation, Generation X, and Generation Y. Generation Y, being the newest generation, is the least understood generation although marketers...

Wallace, Kevin

2007-12-14T23:59:59.000Z

254

Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBiSiteNeutron Scattering4 ByWatchingState ofDr. Donald6from before9

255

Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBiSiteNeutron Scattering4 ByWatchingState ofDr. Donald6from

256

Natural gas vehicles : Status, barriers, and opportunities.  

SciTech Connect (OSTI)

In the United States, recent shale gas discoveries have generated renewed interest in using natural gas as a vehicular fuel, primarily in fleet applications, while outside the United States, natural gas vehicle use has expanded significantly in the past decade. In this report for the U.S. Department of Energy's Clean Cities Program - a public-private partnership that advances the energy, economic, and environmental security of the U.S. by supporting local decisions that reduce petroleum use in the transportation sector - we have examined the state of natural gas vehicle technology, current market status, energy and environmental benefits, implications regarding advancements in European natural gas vehicle technologies, research and development efforts, and current market barriers and opportunities for greater market penetration. The authors contend that commercial intracity trucks are a prime area for advancement of this fuel. Therefore, we examined an aggressive future market penetration of natural gas heavy-duty vehicles that could be seen as a long-term goal. Under this scenario using Energy Information Administration projections and GREET life-cycle modeling of U.S. on-road heavy-duty use, natural gas vehicles would reduce petroleum consumption by approximately 1.2 million barrels of oil per day, while another 400,000 barrels of oil per day reduction could be achieved with significant use of natural gas off-road vehicles. This scenario would reduce daily oil consumption in the United States by about 8%.

Rood Werpy, M.; Santini, D.; Burnham, A.; Mintz, M.; Energy Systems

2010-11-29T23:59:59.000Z

257

The Power Systems Development Facility -- Current status  

SciTech Connect (OSTI)

Southern Company Services, Inc. (SCS) has entered into a cooperative agreement with the US Department of Energy (DOE) to build and operate the Power Systems Development Facility (PSDF), currently under construction in Wilsonville, Alabama, 40 miles southeast of Birmingham. The objectives of the PSDF are to develop advanced coal-fired power generation technologies through testing and evaluation of hot gas cleanup systems and other major components at the pilot scale. The performance of components will be assessed and demonstrated in an integrated mode of operation and at a component size readily scaleable to commercial systems. The facility will initially contain five modules: (1) a transport reactor gasifier and combustor, (2) an advanced pressurized fluidized-bed combustion (APFBC) system, (3) a particulate control module, (4) an advanced burner-gas turbine module, and (5) a fuel cell. The five modules will initially be configured into two separate test trains, the transport reactor train (2 tons/hour of coal feed) and the APFBC train (3 tons/hour of coal feed). In addition to a project description, the project design and construction status, preparations for operations, and project test plans are reported in this paper.

Pinkston, T.E.; Maxwell, J.D.; Leonard, R.F.; Vimalchand, P.

1995-11-01T23:59:59.000Z

258

Steam generator operating experience update, 1982-1983. [PWR  

SciTech Connect (OSTI)

This report is a continuation of earlier reports by the staff addressing pressurized water reactor steam generator operating experience. NUREG-0886, Steam Generator Tube Experience, published in February 1982 summarized experience in domestic and foreign plants through December 1981. This report summarizes steam generator operating experience in domestic plants for the years 1982 and 1983. Included are new problems encountered with secondary-side loose parts, sulfur-induced stress-assisted corrosion cracking, and flow-induced vibrational wear in the new preheater design steam generators. The status of Unresolved Safety Issues A3, A4, and A5 is also discussed.

Frank, L.

1984-06-01T23:59:59.000Z

259

Double beta decay: present status  

E-Print Network [OSTI]

The present status of double beta decay experiments (including the search for $2\\beta^{+}$, EC$\\beta^{+}$ and ECEC processes) are reviewed. The results of the most sensitive experiments are discussed. Average and recommended half-life values for two-neutrino double beta decay are presented. Conservative upper limits on effective Majorana neutrino mass and the coupling constant of the Majoron to the neutrino are established as $ beta decay experiments with a sensitivity for the $$ at the level of (0.01-0.1) eV are considered.

A. S. Barabash

2008-07-18T23:59:59.000Z

260

Status of Charm Flavor Physics  

E-Print Network [OSTI]

The role of charm in testing the Standard Model description of quark mixing and CP violation through measurements of lifetimes, decay constants and semileptonic form factors is reviewed. Together with Lattice QCD, charm has the potential this decade to maximize the sensitivity of the entire flavor physics program to new physics. and pave the way for understanding physics beyond the Standard Model at the LHC in the coming decade. The status of indirect searches for physics beyond the Standard Model through charm mixing, CP-violation and rare decays is also reported.

I. Shipsey

2006-07-26T23:59:59.000Z

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Status of the GRANIT facility  

E-Print Network [OSTI]

The GRANIT facility is a follow-up project, which is motivated by the recent discovery of gravitational quantum states of ultracold neutrons. The goal of the project is to approach the ultimate accuracy in measuring parameters of such quantum states and also to apply this phenomenon and related experimental techniques to a broad range of applications in particle physics as well as in surface and nanoscience studies. We overview the current status of this facility, the recent test measurements and the nearest prospects.

Damien Roulier; Francis Vezzu; Stefan Baessler; Beno顃 Cl閙ent; Daniel Morton; Valery Nesvizhevsky; Guillaume Pignol; Dominique Rebreyend

2014-10-06T23:59:59.000Z

262

Top Quark Current Experimental Status  

E-Print Network [OSTI]

Ten years after its discovery at the Tevatron collider, we still know little about the top quark. Its large mass suggests it may play a key role in the mechanism of Electroweak Symmetry Breaking (EWSB), or open a window of sensitivity to new physics related to EWSB and preferentially coupled to it. To determine whether this is the case, precision measurements of top quark properties are necessary. The high statistics samples being collected by the Tevatron experiments during Run II start to incisively probe the top quark sector. This report summarizes the experimental status of the top quark, focusing in particular on the recent measurements from the Tevatron.

A. Juste

2006-03-04T23:59:59.000Z

263

Status of Energy in Nevada  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Reviewwill help prepare local students forStorm2 |Y-12 Status

264

ARM - Ingest Associated Status Reports  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcal Documentation(AVIRIS) ProductsAirborneOctober 11, 2011 [FacilityIndiaGVAXAssociated Status Reports Ingest

265

Status and Future of TRANSCOM  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small Business Webinar JuneFOADepartment of EnergyStatus Report onSteve

266

Prospects for and Status of CUORE ? The Cryogenic Underground Observatory for Rare Events  

SciTech Connect (OSTI)

CUORE (Cryogenic Underground Observatory for Rare Events) is a next generation experiment designed to search for the neutrinoless DBD of {sup 130}Te using a bolometric technique. The present status of the CUORE is presented along with the latest results from its prototype, CUORICINO.

Norman, E B

2009-07-07T23:59:59.000Z

267

Oil shale: Technology status report  

SciTech Connect (OSTI)

This report documents the status of the US Department of Energy's (DOE) Oil Shale Program as of the end of FY 86. The report consists of (1) a status of oil shale development, (2) a description of the DOE Oil Shale Program, (3) an FY 86 oil shale research summary, and (4) a summary of FY 86 accomplishments. Discoveries were made in FY 86 about the physical and chemical properties and behavior of oil shales, process chemistry and kinetics, in situ retorting, advanced processes, and the environmental behavior and fate of wastes. The DOE Oil Shale Program shows an increasing emphasis on eastern US oil shales and in the development of advanced oil shale processing concepts. With the award to Foster Wheeler for the design of oil shale conceptual plants, the first step in the development of a systems analysis capability for the complete oil shale process has been taken. Unocal's Parachute Creek project, the only commercial oil shale plant operating in the United States, is operating at about 4000 bbl/day. The shale oil is upgraded at Parachute Creek for input to a conventional refinery. 67 refs., 21 figs., 3 tabs.

Not Available

1986-10-01T23:59:59.000Z

268

BIIDSS GL Inquiry Reports CRSP CASH STATUS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BIIDSS GL Inquiry Reports CRSP CASH STATUS MAY 2014 ( IN THOUSANDS) GENERAL SALT SEED- ROCKY DESERT LEDGER DESCRIPTION FUND LAKE SKADEE DOLORES MOUNTAIN SW TOTALS CASH 101002 PY...

269

UESC Status Data Collection and Analysis  

Broader source: Energy.gov [DOE]

Presentation covers the UESC status data collection and analysis, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

270

Status of State Electric Industry Restructuring Activity  

Reports and Publications (EIA)

Presents an overview of the status of electric industry restructuring in each state. Restructuring means that a monopoly system of electric utilities has been replaced with competing sellers.

2010-01-01T23:59:59.000Z

271

Generation gaps in engineering?  

E-Print Network [OSTI]

There is much enthusiastic debate on the topic of generation gaps in the workplace today; what the generational differences are, how to address the apparent challenges, and if the generations themselves are even real. ...

Kim, David J. (David Jinwoo)

2008-01-01T23:59:59.000Z

272

CONSULTANT REPORT DISTRIBUTED GENERATION  

E-Print Network [OSTI]

CONSULTANT REPORT DISTRIBUTED GENERATION INTEGRATION COST STUDY Analytical Framework energy development, or distributed generation, in California. In May 2012, Southern California Edison Southern California Edison's approach to evaluating distributed generation impacts, and to conduct

273

Lithium Research Status and PlansLithium Research Status and Plans Charles H. Skinner, PPPL  

E-Print Network [OSTI]

Lithium Research Status and PlansLithium Research Status and Plans Charles H. Skinner, PPPL Robert February 3-5, 2010 #12;NSTX PAC-27 Lithium Research Status and Plans 2/15February 3-5, 2010 NSTX lithium research is an integral part of a program to develop lithium as a PFC concept for magnetic fusion NSTX w

Princeton Plasma Physics Laboratory

274

CM-1-H Wholesale Power Rate Schedule  

Broader source: Energy.gov [DOE]

Availability:This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency (hereinafter...

275

Measuring efficiency in wholesale electricity markets  

SciTech Connect (OSTI)

The mechanisms of the bid-based economic dispatch and market power mitigation algorithms which result in the market clearing price epitomize the complexity of the new regulatory regime. The augmented Lerner Index presented here offers a method to objectively assess the efficiency of the new structure. (author)

Bowden, Nicholas S.

2009-06-15T23:59:59.000Z

276

Wholesale Power Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment of Energy WhileTanklessLES'NeighborhoodThisApril2014 DOEOctober 1,

277

2012 Wholesale Power and Transmission Rate  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered聣PNGExperience hands-onASTROPHYSICS H. I. Park, L.2State of Matter20122

278

2012 Wholesale Power and Transmission Rate  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered聣PNGExperience hands-onASTROPHYSICS H. I. Park, L.2State of Matter20122B O N N E

279

Wholesale Power Rate Schedules | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and MaterialsWenjun DengWISP SignInWho do I contact atRate

280

Wholesale Power Rate Schedules | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Dept.| WEATHERIZATION5 | EnergyMay 7,Who WillDepartment

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

NREL: Transmission Grid Integration - Wholesale Electricity Market  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andData and ResourcesOtherForecasting NRELResearchWebinarsStudy Phase

282

Small Generator Aggregation (Maine)  

Broader source: Energy.gov [DOE]

This section establishes requirements for electricity providers to purchase electricity from small generators, with the goal of ensuring that small electricity generators (those with a nameplate...

283

Next Generation Reactors  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nuclear Advances We are coordinating the Generation IV Nuclear Systems Initiative - an international effort to develop the next generation of nuclear power reactors. Skip...

284

Concentrated Solar Power Generation.  

E-Print Network [OSTI]

??Solar power generation is the most promising technology to transfer energy consumption reliance from fossil fuel to renewable sources. Concentrated solar power generation is a (more)

Jin, Zhilei

2013-01-01T23:59:59.000Z

285

Western Interconnection Energy Imbalance Market Status and Prospects (Presentation)  

SciTech Connect (OSTI)

This presentation describes how a new wholesale electricity market for energy imbalance ancillary services could be implemented and operated. Some conclusions of this presentation are: (1) Method for calculating additional reserve requirements due to wind and solar production; (2) EIM results in substantial reduction in reserves requirements and ramping demand; (3) Reduced participation reduces benefits for all but reduces the benefits to non-participants the most; (4) Full participation leads to maximum benefit across the Western Interconnection, up to 42% of total reserve requirement; and (5) Regional EIM implementations have smaller but substantial benefits.

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2011-10-01T23:59:59.000Z

286

Construction Status of Linac4  

E-Print Network [OSTI]

The civil engineering works of the Linac4 linear accelerator at CERN started in October 2008 and regular machine operation is foreseen for 2013. Linac4 will accelerate H?ions to an energy of 160 MeV for injection into the PS Booster (PSB). It will thus replace the ageing Linac2, which presently injects at 50 MeV into the PSB, and it will also represents the first step in the injector upgrade for the LHC aiming at increasing its luminosity. This paper reports on the status of the design and construction of the main machine elements, which will be installed in the linac tunnel from the beginning of 2012 onwards, on the progress of the civil engineering and on the ongoing activities at the Linac4 test stand.

Gerigk, F; Garoby, R; Hanke, K; Lombardi, A M; MacCaferri, R; Maury, S; Rossi, C; Vretenar, M

2010-01-01T23:59:59.000Z

287

Green Sturgeon (Acipenser medirostris) Status Review Update  

E-Print Network [OSTI]

Green Sturgeon (Acipenser medirostris) Status Review Update Biological Review Team Santa Cruz Status of Green Sturgeon 1 3. Key Questions in ESA Determination 3 a. The "Species" Question 3 b. The Extinction Risk Question 4 c. "A significant portion of the species' range" issue 4 Recently Updated Green

288

STATUS OF SOLAR MODELS a JOHN BAHCALL  

E-Print Network [OSTI]

by nuclear fusion reactions in the interior of the sun. The four pioneering experiments--chlorine 756 STATUS OF SOLAR MODELS a JOHN BAHCALL Institute for Advanced Study, Princeton, NJ 08540 M. H Introduction I was asked by Matts Roos to review in this talk the status of solar models as they relate

Bahcall, John

289

RenewableS 2011 GLOBAL STATUS REPORT  

E-Print Network [OSTI]

__20112011 RenewableS 2011 GLOBAL STATUS REPORT Full Report at: http://www.ren21.net/Portals/97/documents/GSR/REN21_GSR2011.pdf #12;11 Changes in renewable energy markets, investments, industries, and policies have been so rapid in recent years that perceptions of the status of renewable energy can lag

Kostic, Milivoje M.

290

AGRICULTURE, 2005 Status of the Wisconsin Farm Economy  

E-Print Network [OSTI]

STATUS OF WISCONSIN AGRICULTURE, 2005 Status of the Wisconsin Farm Economy Situation and Outlook: Farm Products, Farm Inputs and the General Economy Special Articles 路 Expansion, Modernization..............................................................................................................................v I. Status of the Wisconsin Farm Economy

Radeloff, Volker C.

291

ENERGY GENERATION RESEARCH PIER Energy Generation Research  

E-Print Network [OSTI]

ENERGY GENERATION RESEARCH PIER Energy Generation Research www.energy.ca.gov/research/ renewable/ November 2010 Sonoma County RESCO A Local Level Approach to Renewable Energy Portfolios. The Issue To address energy usage that contributes to climate change, California has enacted legislation to guide

292

Gamma ray generator  

DOE Patents [OSTI]

An embodiment of a gamma ray generator includes a neutron generator and a moderator. The moderator is coupled to the neutron generator. The moderator includes a neutron capture material. In operation, the neutron generator produces neutrons and the neutron capture material captures at least some of the neutrons to produces gamma rays. An application of the gamma ray generator is as a source of gamma rays for calibration of gamma ray detectors.

Firestone, Richard B; Reijonen, Jani

2014-05-27T23:59:59.000Z

293

Generation to Generation: The Heart of Family Medicine  

E-Print Network [OSTI]

Ageism in the Workplace. Generations Spring, 5. Westman,of caring for multiple generations simultaneously. StronglyGeneration to Generation: The Heart of Family Medicine

Winter, Robin O

2012-01-01T23:59:59.000Z

294

Steam generator operating experience, update for 1989--1990  

SciTech Connect (OSTI)

This report summarizes operational events and degradation mechanisms affecting pressurized water reactor steam generator integrity. It provides: results of 1989 and 1990 steam generator inspections; highlights prevalent problem areas; improvements that have been made in nondestructive testing methods; preventive measures; repair techniques; and replacement procedures. It describes the equipment of the three (3) major suppliers and discusses recent examinations of 76 plants. Major areas of concern are the steam generator degradation mechanisms that affect tube integrity or cause tube leakage and tube failure. These include; (1) intergranular attack (IGA); (2) intergranular stress corrosion cracking (IGSCC); (3) primary water stress corrosion cracking (PWSCC); (4) pitting; and (5) vibrational wear and fatigue. Also discussed are plugging, sleeving, heat treatment, peening, chemical cleaning, and steam generator replacements. The current status of regulatory instruments and inspection guidelines for ensuring the steam generator integrity, is discussed with the highlights of steam generator research. New potential safety issues such as circumferential cracking and tube plug cracking are also discussed.

Frank, L.

1991-12-01T23:59:59.000Z

295

Status and Prospects of the Global Automotive Fuel Cell Industry...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Status and Prospects of the Global Automotive Fuel Cell Industry and Plans for Deployment of Fuel Cell Vehicles and Hydrogen Refueling Infrastructure Status and Prospects of the...

296

Status and Progress in Research, Development and Demonstration...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Status and Progress in Research, Development and Demonstration of Hydrogen-Compressed Natural Gas Vehicles in China Status and Progress in Research, Development and Demonstration...

297

Status Prospects of Green Data Center | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Status Prospects of Green Data Center Status Prospects of Green Data Center Information on energy-saving technology research of green data centers and the potential impacts....

298

Status and EAC Recommendations for Electricity Delivery Workforce...  

Energy Savers [EERE]

Status and EAC Recommendations for Electricity Delivery Workforce (September 2014) Status and EAC Recommendations for Electricity Delivery Workforce (September 2014) This memo,...

299

UNIT NAME C-611 PCB Spill Site REGULATORY STATUS CERCLA  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

79 UNIT NAME C-611 PCB Spill Site REGULATORY STATUS CERCLA LOCATION C-611 Transformer area (Map location 79) APPROXIMATE DIMENSIONS FUNCTION Spill Site OPERATIONAL STATUS NA DATES...

300

Status Report, Department of Energy - March 2006 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Status Report, Department of Energy - March 2006 March 2006 Report on Safety System Engineer and Oversight Programs This report provides a status of the implementation of safety...

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Cylindrical neutron generator  

DOE Patents [OSTI]

A cylindrical neutron generator is formed with a coaxial RF-driven plasma ion source and target. A deuterium (or deuterium and tritium) plasma is produced by RF excitation in a cylindrical plasma ion generator using an RF antenna. A cylindrical neutron generating target is coaxial with the ion generator, separated by plasma and extraction electrodes which contain many slots. The plasma generator emanates ions radially over 360.degree. and the cylindrical target is thus irradiated by ions over its entire circumference. The plasma generator and target may be as long as desired. The plasma generator may be in the center and the neutron target on the outside, or the plasma generator may be on the outside and the target on the inside. In a nested configuration, several concentric targets and plasma generating regions are nested to increase the neutron flux.

Leung, Ka-Ngo

2005-06-14T23:59:59.000Z

302

Cylindrical neutron generator  

DOE Patents [OSTI]

A cylindrical neutron generator is formed with a coaxial RF-driven plasma ion source and target. A deuterium (or deuterium and tritium) plasma is produced by RF excitation in a cylindrical plasma ion generator using an RF antenna. A cylindrical neutron generating target is coaxial with the ion generator, separated by plasma and extraction electrodes which contain many slots. The plasma generator emanates ions radially over 360.degree. and the cylindrical target is thus irradiated by ions over its entire circumference. The plasma generator and target may be as long as desired. The plasma generator may be in the center and the neutron target on the outside, or the plasma generator may be on the outside and the target on the inside. In a nested configuration, several concentric targets and plasma generating regions are nested to increase the neutron flux.

Leung, Ka-Ngo (Hercules, CA)

2008-04-22T23:59:59.000Z

303

Cylindrical neutron generator  

DOE Patents [OSTI]

A cylindrical neutron generator is formed with a coaxial RF-driven plasma ion source and target. A deuterium (or deuterium and tritium) plasma is produced by RF excitation in a cylindrical plasma ion generator using an RF antenna. A cylindrical neutron generating target is coaxial with the ion generator, separated by plasma and extraction electrodes which contain many slots. The plasma generator emanates ions radially over 360.degree. and the cylindrical target is thus irradiated by ions over its entire circumference. The plasma generator and target may be as long as desired. The plasma generator may be in the center and the neutron target on the outside, or the plasma generator may be on the outside and the target on the inside. In a nested configuration, several concentric targets and plasma generating regions are nested to increase the neutron flux.

Leung, Ka-Ngo (Hercules, CA)

2009-12-29T23:59:59.000Z

304

Status of fission yield evaluations  

SciTech Connect (OSTI)

Very few yield compilations are also evaluations, and very few contain an extensive global library of measured data and extensive models for unmeasured data. The earlier U.K. evaluations and US evaluations were comparable up to the retirements of the primary evaluators. Only the effort in the US has been continued and expanded. The previous U.K. evaluations have been published. In this paper we summarize the current status of the US evaluation, philosophy, and various integral yield tests for 34 fissioning nuclides at one or more neutron incident energies and/or for spontaneous fission. Currently there are 50 yield sets and for each we have independent and cumulative yields and uncertainties for approximately 1100 fission products. When finalized, the recommended data will become part of the next version of the US Evaluated Nuclear Data File (ENDF/B-VI). The complete set of data, including the basic input of measured yields, will be issued as a sequel to the General Electric evaluation reports (better known by the authors' names: Rider - or earlier - Meek and Rider). 16 references.

England, T.R.; Rider, B.F.

1983-01-01T23:59:59.000Z

305

The Current Status of Asteroseismology  

E-Print Network [OSTI]

Stellar evolution, a fundamental bedrock of modern astrophysics, is driven by the physical processes in stellar interiors. While we understand these processes in general terms, we lack some important ingredients. Seemingly small uncertainties in the input physics of the models, e.g., the opacities or the amount of mixing and of interior rotation, have large consequences for the evolution of stars. The goal of asteroseismology is to improve the description of the interior physics of stars by means of their oscillations, just as global helioseismology led to a huge step forward in our knowledge about the internal structure of the Sun. In this paper we present the current status of asteroseismology by considering case studies of stars with a variety of masses and evolutionary stages. In particular, we outline how the confrontation between the observed oscillation frequencies and those predicted by the models allows us to pinpoint limitations of the input physics of current models and improve them to a level that cannot be reached with any other current method.

C. Aerts; J. Christensen-Dalsgaard; M. Cunha; D. W. Kurtz

2008-03-25T23:59:59.000Z

306

NGNP Research and Development Status  

SciTech Connect (OSTI)

At the inception of the Next Generation Nuclear Plant (NGNP) project, experts from the Department of Energy (DOE) national laboratories, gas reactor vendors, and universities collaborated to establish technology research and development (R&D) roadmaps. These roadmaps outlined the testing and computational development activities needed to qualify the materials and validate the modeling and simulation tools to be used in the design and safe operation of the NGNP, a helium-cooled, high temperature gas reactor (HTGR).

David A. Petti

2010-08-01T23:59:59.000Z

307

National Hydrogen Learning Demonstration Status (Presentation)  

SciTech Connect (OSTI)

This presentation discusses U.S. DOE Learning Demonstration Project goals, fuel cell vehicle and H2 station deployment status, and technical highlights of vehicle and infrastructure analysis results and progress.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2012-02-01T23:59:59.000Z

308

Status of the APEX Project at LBNL  

E-Print Network [OSTI]

STATUS OF THE APEX PROJECT AT LBNL* F. Sannibale, B. Bailey,ANL-08/39, BNL-81895, LBNL-1090E, SLAC-R-917, (2008). [8] F.M. Zolotorev, F. Zucca, LBNL, Berkeley, CA, USA M. Prantil,

Sannibale, F.

2014-01-01T23:59:59.000Z

309

Requirements & Status for Volume Fuel Cell Manufacturing  

E-Print Network [OSTI]

Requirements & Status for Volume Fuel Cell Manufacturing DOE Hydrogen Program, Washington, DC July 颅Eliminate components, parts and process steps 颅Standardize core components across products 颅Standardize non-core

310

Power, status, and learning in organizations  

E-Print Network [OSTI]

This paper reviews the scholarly literature on the effects of social hierarchy梔ifferences in power and status among organizational actors梠n collective learning in organizations and groups. We begin with the observation ...

Bunderson, J. Stuart

311

Structure formation: Models, Dynamics and Status  

E-Print Network [OSTI]

The constraints on the models for the structure formation arising from various cosmological observations at different length scales are reviewed. The status of different models for structure formation is examined critically in the light of these observations.

T. Padmanabhan

1995-08-25T23:59:59.000Z

312

Status of the MAJORANA DEMONSTRATOR experiment  

SciTech Connect (OSTI)

The MAJORANA DEMONSTRATOR neutrinoless double beta-decay experiment is currently under construction at the Sanford Underground Research Facility in South Dakota, USA. An overview and status of the experiment are given.

Martin, R. D. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA, USA and Department of Physics, University of South Dakota, Vermillion, SD (United States); Abgrall, N.; Chan, Y-D.; Hegai, A.; Mertens, S.; Poon, A. W. P.; Vetter, K. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA (United States); Aguayo, E.; Fast, J. E.; Hoppe, E. W.; Kouzes, R. T.; LaFerriere, B. D.; Orrell, J. L.; Overman, N. R.; Soin, A. [Pacific Northwest National Laboratory, Richland, WA (United States); Avignone III, F. T. [Department of Physics and Astronomy, University of South Carolina, Columbia, SC, USA and Oak Ridge National Laboratory, Oak Ridge, TN (United States); Barabash, A. S.; Konovalov, S. I.; Yumatov, V. [Institute for Theoretical and Experimental Physics, Moscow (Russian Federation); Bertrand, F. E. [Oak Ridge National Laboratory, Oak Ridge, TN (United States); and others

2014-06-24T23:59:59.000Z

313

Class of 2007 Career Status Survey  

E-Print Network [OSTI]

..................................................24-26 II. Salary Statistics (Full-Time Employment Only): Starting Salaries...........................................................4 Summary Statistics..................................................................................5 Employment and Post-Baccalaureate Program Status by Major at Wittenberg......6 Employment and Post

Bogaerts, Steven

314

Class of 2009 Career Status Survey  

E-Print Network [OSTI]

..................................................22-24 II. Salary Statistics (Full-Time Employment Only): Starting Salaries...........................................................4 Summary Statistics..................................................................................5 Employment and Post-Baccalaureate Program Status by Major at Wittenberg......6 Employment and Post

Bogaerts, Steven

315

Class of 2010 Career Status Survey  

E-Print Network [OSTI]

..................................................23-25 II. Salary Statistics (Full-Time Employment Only): Starting Salaries...........................................................4 Summary Statistics..................................................................................5 Employment and Post-Baccalaureate Program Status by Major at Wittenberg......6 Employment and Post

Bogaerts, Steven

316

Class of 2008 Career Status Survey  

E-Print Network [OSTI]

..................................................22-24 II. Salary Statistics (Full-Time Employment Only): Starting Salaries...........................................................4 Summary Statistics..................................................................................5 Employment and Post-Baccalaureate Program Status by Major at Wittenberg......6 Employment and Post

Bogaerts, Steven

317

New wave generation  

E-Print Network [OSTI]

We present the results of a combined experimental and numerical study of the generation of internal waves using the novel internal wave generator design of Gostiaux et al. (Exp. Fluids, vol. 42, 2007, pp. 123130). This ...

Mercier, Matthieu J.

318

Nuclear waste incineration technology status  

SciTech Connect (OSTI)

The incinerators developed and/or used for radioactive waste combustion are discussed and suggestions are made for uses of incineration in radioactive waste management programs and for incinerators best suited for specific applications. Information on the amounts and types of radioactive wastes are included to indicate the scope of combustible wastes being generated and in existence. An analysis of recently developed radwaste incinerators is given to help those interested in choosing incinerators for specific applications. Operating information on US and foreign incinerators is also included to provide additional background information. Development needs are identified for extending incinerator applications and for establishing commercial acceptance.

Ziegler, D.L.; Lehmkuhl, G.D.; Meile, L.J.

1981-07-15T23:59:59.000Z

319

Making the Economic Case for Small-Scale Distributed Wind -- A Screening for Distributed Generation Wind Opportunities: Preprint  

SciTech Connect (OSTI)

This study was an offshoot of a previous assessment, which examined the potential for large-scale, greater than 50 MW, wind development on occupied federal agency lands. The study did not find significant commercial wind development opportunities, primarily because of poor wind resource on available and appropriately sized land areas or land use or aesthetic concerns. The few sites that could accommodate a large wind farm failed to have transmission lines in optimum locations required to generate power at competitive wholesale prices. The study did identify a promising but less common distributed generation (DG) development option. This follow-up study documents the NREL/Global Energy Concepts team efforts to identify economic DG wind projects at a select group of occupied federal sites. It employs a screening strategy based on project economics that go beyond quantity of windy land to include state and utility incentives as well as the value of avoided power purchases. It attempts to account for the extra costs and difficulties associated with small projects through the use of project scenarios that are more compatible with federal facilities and existing land uses. These benefits and barriers of DG are discussed, and the screening methodology and results are included. The report concludes with generalizations about the screening method and recommendations for improvement and other potential applications for this methodology.

Kandt, A.; Brown, E.; Dominick, J.; Jurotich, T.

2007-06-01T23:59:59.000Z

320

Indian Renewable Energy Status Report: Background Report for DIREC 2010  

SciTech Connect (OSTI)

India has great potential to accelerate use of endowed renewable resources in powering its growing economy with a secure and affordable energy supply. The Government of India recognizes that development of local, renewable resources will be critical to ensure that India is able to meet both economic and environmental objectives and has supported the development of renewable energy through several policy actions. This paper describes the status of renewable energy in India as of DIREC 2010. It begins by describing the institutional framework guiding energy development in India, the main policy drivers impacting energy, and the major policy actions India has taken that impact renewable energy deployment. The paper presents estimates of potential for wind, solar, small hydro, and bioenergy and the deployment of each of these technologies to date in India. The potential for India to meet both large-scale generation needs and provide access to remote, unelectrified populations are covered. Finally, the enabling environment required to facilitate rapid scale of renewables is discussed, including issues of technology transfer and the status of financing in India.

Arora, D. S.; Busche, S.; Cowlin, S.; Engelmeier, T.; Jaritz, J.; Milbrandt, A.; Wang, S.

2010-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

Plant Construction Cost, Regional Retail Electricity Requirements, and Natural Gas and Wholesale for generating plant construction costs, load requirements, and wholesale market electricity and natural gas meeting suggested futures should reflect Expectations about cost trends Greater uncertainty associated

322

Current status of ForecastCurrent status of Forecast 2005 EPACT is in the model  

E-Print Network [OSTI]

1 1 Current status of ForecastCurrent status of Forecast 2005 EPACT is in the model 2007 Federal prices are being inputted into the model 2 Sales forecast Select yearsSales forecast Select years --Draft 0.53% Irrigation 2.76% Annual Growth Rates Preliminary Electricity ForecastAnnual Growth Rates

323

Effects of Temporal Wind Patterns on the Value of Wind-Generated Electricity in California and the Northwest  

E-Print Network [OSTI]

of electric power from potential wind farm locations inergy 1.5 MW wind turbine to calculate the potential powerpotential difference in wholesale market value between better- correlated and poorly correlated wind

Wiser, Ryan H

2008-01-01T23:59:59.000Z

324

Creating a Cognitive Agent in a Virtual World: Planning, Navigation, and Natural Language Generation  

E-Print Network [OSTI]

Generation . . . . . . . . . . . . . . . . . . . . .Language Generation . . . . . . . . . . . . . . . . .Language Generation . . . . . . . . . . . . . . . . . . . .

Hewlett, William

2013-01-01T23:59:59.000Z

325

Annual Hanford Site environmental permitting status report  

SciTech Connect (OSTI)

This Annual Hanford Site Environmental Permitting Status Report (Status Report) was prepared in response to requirements prescribed in U.S. Department of Energy (DOE) Order 5400.2A, `Environmental Compliance Issue Coordination`. This Order, canceled in April 1996, required that information on existing and anticipated environmental permitting for DOE facilities be submitted (or updated) annually by October 1 of each calendar year. Although the Order was canceled, the need for this Status Report still remains. For example, the Washington State Department of Ecology`s (Ecology) Dangerous Waste Permit Application Requirements (Publication Number 95-402, June 1996), Checklist Section J, calls for current information on existing and anticipated environmental permitting. As specified in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28), this Status Report serves as the vehicle for meeting this requirement for the Hanford Facility. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by the Resource Conservation and Recovery Act (RCRA) of 1976, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) are addressed. Information on RCRA and non-RCRA permitting is included and is current as of July 31, 1996.

Thompson, S.A.

1996-10-01T23:59:59.000Z

326

Steam generator support system  

DOE Patents [OSTI]

A support system for connection to an outer surface of a J-shaped steam generator for use with a nuclear reactor or other liquid metal cooled power source is disclosed. The J-shaped steam generator is mounted with the bent portion at the bottom. An arrangement of elongated rod members provides both horizontal and vertical support for the steam generator. The rod members are interconnected to the steam generator assembly and a support structure in a manner which provides for thermal distortion of the steam generator without the transfer of bending moments to the support structure and in a like manner substantially minimizes forces being transferred between the support structure and the steam generator as a result of seismic disturbances. 4 figs.

Moldenhauer, J.E.

1987-08-25T23:59:59.000Z

327

Steam generator support system  

DOE Patents [OSTI]

A support system for connection to an outer surface of a J-shaped steam generator for use with a nuclear reactor or other liquid metal cooled power source. The J-shaped steam generator is mounted with the bent portion at the bottom. An arrangement of elongated rod members provides both horizontal and vertical support for the steam generator. The rod members are interconnected to the steam generator assembly and a support structure in a manner which provides for thermal distortion of the steam generator without the transfer of bending moments to the support structure and in a like manner substantially minimizes forces being transferred between the support structure and the steam generator as a result of seismic disturbances.

Moldenhauer, James E. (Simi Valley, CA)

1987-01-01T23:59:59.000Z

328

Method of grid generation  

DOE Patents [OSTI]

The present invention provides a method of grid generation that uses the geometry of the problem space and the governing relations to generate a grid. The method can generate a grid with minimized discretization errors, and with minimal user interaction. The method of the present invention comprises assigning grid cell locations so that, when the governing relations are discretized using the grid, at least some of the discretization errors are substantially zero. Conventional grid generation is driven by the problem space geometry; grid generation according to the present invention is driven by problem space geometry and by governing relations. The present invention accordingly can provide two significant benefits: more efficient and accurate modeling since discretization errors are minimized, and reduced cost grid generation since less human interaction is required.

Barnette, Daniel W. (Veguita, NM)

2002-01-01T23:59:59.000Z

329

Talkin Bout Wind Generation  

Broader source: Energy.gov [DOE]

The amount of electricity generated by the wind industry started to grow back around 1999, and since 2007 has been increasing at a rapid pace.

330

SNE TRAFIC GENERATOR  

Energy Science and Technology Software Center (OSTI)

003027MLTPL00 Network Traffic Generator for Low-rate Small Network Equipment Software http://eln.lbl.gov/sne_traffic_gen.html

331

Next-generation transcriptome assembly  

E-Print Network [OSTI]

technologies - the next generation. Nat Rev Genet 11, 31-algorithms for next-generation sequencing data. Genomicsassembly from next- generation sequencing data. Genome Res

Martin, Jeffrey A.

2012-01-01T23:59:59.000Z

332

Second generation PFB for advanced power generation  

SciTech Connect (OSTI)

Research is being conducted under a United States Department of Energy (USDOE) contract to develop a new type of coal-fueled plant for electric power generation. This new type of plant-called an advanced or second-generation pressurized fluidized bed combustion (APFBC) plant-offers the promise of 45-percent efficiency (HHV), with emissions and a cost of electricity that are significantly lower than conventional pulverized-coal-fired plants with scrubbers. This paper summarizes the pilot plant R&D work being conducted to develop this new type of plant. Although pilot plant testing is still underway, preliminary estimates indicate the commercial plant Will perform better than originally envisioned. Efficiencies greater than 46 percent are now being predicted.

Robertson, A.; Van Hook, J.

1995-11-01T23:59:59.000Z

333

Laser beam generating apparatus  

DOE Patents [OSTI]

Laser beam generating apparatus including a septum segment disposed longitudinally within the tubular structure of the apparatus. The septum provides for radiatively dissipating heat buildup within the tubular structure and for generating relatively uniform laser beam pulses so as to minimize or eliminate radial pulse delays (the chevron effect). 11 figures.

Warner, B.E.; Duncan, D.B.

1993-12-28T23:59:59.000Z

334

Laser beam generating apparatus  

DOE Patents [OSTI]

Laser beam generating apparatus including a septum segment disposed longitudinally within the tubular structure of the apparatus is described. The septum provides for radiatively dissipating heat buildup within the tubular structure and for generating relatively uniform laser beam pulses so as to minimize or eliminate radial pulse delays (the chevron effect). 7 figures.

Warner, B.E.; Duncan, D.B.

1994-02-15T23:59:59.000Z

335

features Utility Generator  

E-Print Network [OSTI]

#12;#12;#12;#12;features function utility Training Pool Utility Generator Per-frame function content utility classes utility classes utility Tree Decision Generator Module Utility Clustering Adaptive Content Classification Loop features content VO selection & Utility Selector content features Real

Chang, Shih-Fu

336

Event generator overview  

SciTech Connect (OSTI)

Due to their ability to provide detailed and quantitative predictions, the event generators have become an important part of studying relativistic heavy ion physics and of designing future experiments. In this talk, the author will briefly summarize recent progress in developing event generators for the relativistic heavy ion collisions.

Pang, Y.

1997-12-01T23:59:59.000Z

337

Improved solid aerosol generator  

DOE Patents [OSTI]

An improved solid aerosol generator used to produce a gas borne stream of dry, solid particles of predetermined size and concentration. The improved solid aerosol generator nebulizes a feed solution of known concentration with a flow of preheated gas and dries the resultant wet heated aerosol in a grounded, conical heating chamber, achieving high recovery and flow rates. 2 figs.

Prescott, D.S.; Schober, R.K.; Beller, J.

1988-07-19T23:59:59.000Z

338

Internal split field generator  

DOE Patents [OSTI]

A generator includes a coil of conductive material. A stationary magnetic field source applies a stationary magnetic field to the coil. An internal magnetic field source is disposed within a cavity of the coil to apply a moving magnetic field to the coil. The stationary magnetic field interacts with the moving magnetic field to generate an electrical energy in the coil.

Thundat; Thomas George (Knoxville, TN); Van Neste, Charles W. (Kingston, TN); Vass, Arpad Alexander (Oak Ridge, TN)

2012-01-03T23:59:59.000Z

339

ATF2 Summary and Status  

SciTech Connect (OSTI)

The Accelerator Test Facility (ATF) [1] at KEK was originally constructed as a Damping Ring (DR) demonstration facility for the next generation of electron linear colliders. It consists of a 1.3 GeV s-band linac and a 136m circumference damping ring which can routinely generate 1.6 nC electron bunches with very small vertical emittances (<10pm.rad). Completed in December of 2008, a new extraction line and final focus optics was built, this is referred to as ATF2 [2]. The location of ATF in-relation to the KEK site can be seen in Figure 1. ATF is a general-purpose facility for accelerator physics related R and D activities, with approximately 50% of the available beam time currently devoted to the ATF2 program. The ATF2 extraction line (EXT) and final focus system (FFS) extends about 90 meters from the DR extraction point, a sketch of this system can be seen in figure 2, along with the location of key instrumentation. The primary purpose of the ATF2 beam line is to demonstrate a new style of magnetic focusing optics intended for use at future linear colliders, such as ILC or CLIC based on a local chromaticity correction scheme. The primary goal of the collaboration is to demonstrate the ability of this optics to focus an electron beam of similar emittance to the ILC using a FFS of the same design chromaticity. A comparison of some of the ATF2 design parameters with those of the ILC and CLIC are shown in table 1. With the 1.3 GeV beam energy of ATF2, the target spot size to prove the operability of this optics for ILC is 37nm. This is referred to as 'Goal 1'. In addition, Goal 1 requires the demonstration of stable operations with such a beam size at the Interaction Point (IP). 'Goal 2' is to demonstrate nm-level stability with respect to the IP beam monitors, such as is required for stable beam collisions at ILC or CLIC. A further goal is to attempt to increase the chromaticity of the final focus optics, reducing the IP beta functions to a level where the system more closely resembles the CLIC FFS, and also for some of the newly proposed ILC parameters. It is anticipated that the difficulty of successfully tuning the FFS to deliver design IP beam spot sizes scales with the chromaticity of the system. The design of the achromatic focusing system involves fine cancelation of first, second and third order aberrations at the IP. One needs more accurate cancelation the tighter one attempts to focus the beam, also including more higher order terms. By gradually pushing the system to smaller IP beta functions and higher chromaticity we hope to learn what the limits of such a design are when applied practically. This will give confidence in the design philosophy behind future high-luminosity colliders and in the simulations used to predict their behaviour.

Alabau-Gonzalvo, J.; /Valencia U., IFIC; Alabau Pons, M.; /CERN; Amann, J.; /SLAC; Angal-Kalinin, D.; /Cockcroft Inst. Accel. Sci. Tech.; Apsimon, R.; /Oxford U., JAI; Araki, S.; /KEK, Tsukuba; Aryshev, A.; /KEK, Tsukuba; Bai, S.; /Beijing, Inst. High Energy Phys.; Bambade, P.; /Orsay, LAL /KEK, Tsukuba; Bellomo, P.; /SLAC; Bett, D.; /Oxford U., JAI; Blair, G.; /Oxford U., JAI; Blanch, C.; /Valencia U., IFIC; Bolzon, B.; /CERN; Boogert, S.; /Oxford U., JAI; Boorman, G.; /Oxford U., JAI; Burrows, P.; /Oxford U., JAI; Christian, G.; /Oxford U., JAI; Coe, P.; /Oxford U., JAI; Constance, B.; /Oxford U., JAI; Corner, L.; /Oxford U., JAI /Oxford U., JAI /CERN /Oxford U., JAI /DESY /Valencia U., IFIC /SLAC /KEK, Tsukuba /Beijing, Inst. High Energy Phys. /ESIA, Annecy /Fermilab /Ecole Polytechnique /KEK, Tsukuba /Kyungpook Natl. U. /KEK, Tsukuba /Pohang Accelerator Lab. /Pohang Accelerator Lab. /Kyoto U., Inst. Chem. Res. /ESIA, Annecy /Cockcroft Inst. Accel. Sci. Tech. /Tokyo U. /Oxford U., JAI /Kyungpook Natl. U. /Kyungpook Natl. U. /Pohang Accelerator Lab. /Kyungpook Natl. U. /Tokyo U. /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /SLAC /University Coll. London /KEK, Tsukuba /SLAC /Oxford U., JAI /KEK, Tsukuba /Tokyo U. /SLAC /Oxford U., JAI /Tohoku U. /KEK, Tsukuba /Tokyo U. /Pohang Accelerator Lab. /Brookhaven /SLAC /Oxford U., JAI /SLAC /SLAC /CERN /Oxford U., JAI /Orsay, LAL /Fermilab /Tohoku U. /Manchester U. /CERN /Oxford U., JAI /SLAC /SLAC /SLAC /Tokyo U. /KEK, Tsukuba /Oxford U., JAI /Hiroshima U. /KEK, Tsukuba /KEK, Tsukuba /CERN /KEK, Tsukuba /Oxford U., JAI /Ecole Polytechnique /Oxford U., JAI /Beijing, Inst. High Energy Phys. /SLAC /Oxford U., JAI /Fermilab /SLAC /SLAC /Liverpool U. /SLAC /Tokyo U. /Tokyo U. /Tokyo U. /Tokyo U. /KEK, Tsukuba /SLAC /CERN

2012-04-19T23:59:59.000Z

340

Alternative calcination development status report  

SciTech Connect (OSTI)

The Programmatic Spent Nuclear Fuel and (INEEL) Environmental Restoration and Waste Management Programs Environmental Impact Statement Record of Decision, dated June 1, 1995, specifies that high-level waste stored in the underground tanks at the ICPP continue to be calcined while other options to treat the waste are studied. Therefore, the High-Level Waste Program has funded a program to develop new flowsheets to increase the liquid waste processing rate. Simultaneously, a radionuclide separation process, as well as other options, are also being developed, which will be compared to the calcination treatment option. Two alternatives emerged as viable candidates; (1) elevated temperature calcination (also referred to as high temperature calcination), and (2) sugar-additive calcination. Both alternatives were determined to be viable through testing performed in a lab-scale calcination mockup. Subsequently, 10-cm Calciner Pilot Plant scoping tests were successfully completed for both flowsheets. The results were compared to the standard 500 C, high-ANN flow sheet (baseline flowsheet). The product and effluent streams were characterized to help elucidate the process chemistry and to investigate potential environmental permitting issues. Several supplementary tests were conducted to gain a better understanding of fine-particles generation, calcine hydration, scrub foaming, feed makeup procedures, sugar/organic elimination, and safety-related issues. Many of the experiments are only considered to be scoping tests, and follow-up experiments will be required to establish a more definitive understanding of the flowsheets. However, the combined results support the general conclusion that flowsheet improvements for the NWCF are technically viable.

Boardman, R.D.

1997-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Shaft generator transmissions  

SciTech Connect (OSTI)

Economical on-board power can be generated from two-stroke, low-speed engines by installing a multistage hollow-shaft gearbox on the propeller intermediate shaft to drive the generator. Gearbox manufacturer Asug, based in Dessau, Germany, has designed units specifically for this purpose. The Asug shaft generator drive concept for generator drives at the front end of the engine is designed to reduce installation costs and uses an integrated engine-gearbox foundation. The complete propulsion system, consisting of the diesel engine, gear with coupling and generator, can be completely or partially preassembled outside the ship`s engine room to reduce onboard assembly time. A separate foundation for this arrangement is not necessary. The company offers a full range of gearboxes to generate power from 500 kW up to 5000 kW. Gearboxes driven from the forward engine end often incorporate an additional gear stage to gain energy from an exhaust turbine. This arrangement feeds part of the exhaust energy back into the system to increase efficiency. Latest installations of Asug shaft generator gears are in container ships and cargo/container ships built in Turkey and China.

NONE

1995-11-01T23:59:59.000Z

342

Wind power generating system  

SciTech Connect (OSTI)

Normally feathered propeller blades of a wind power generating system unfeather in response to the actuation of a power cylinder that responds to actuating signals. Once operational, the propellers generate power over a large range of wind velocities. A maximum power generation design point signals a feather response of the propellers so that once the design point is reached no increase in power results, but the system still generates power. At wind speeds below this maximum point, propeller speed and power output optimize to preset values. The propellers drive a positive displacement pump that in turn drives a positive displacement motor of the swash plate type. The displacement of the motor varies depending on the load on the system, with increasing displacement resulting in increasing propeller speeds, and the converse. In the event of dangerous but not clandestine problems developing in the system, a control circuit dumps hydraulic pressure from the unfeathering cylinder resulting in a predetermined, lower operating pressure produced by the pump. In the event that a problem of potentially cladestine consequence arises, the propeller unfeathering cylinder immediately unloads. Upon startup, a bypass around the motor is blocked, applying a pressure across the motor. The motor drives the generator until the generator reaches a predetermined speed whereupon the generator is placed in circuit with a utility grid and permitted to motor up to synchronous speed.

Schachle, Ch.; Schachle, E. C.; Schachle, J. R.; Schachle, P. J.

1985-03-12T23:59:59.000Z

343

Compact neutron generator  

DOE Patents [OSTI]

A compact neutron generator has at its outer circumference a toroidal shaped plasma chamber in which a tritium (or other) plasma is generated. A RF antenna is wrapped around the plasma chamber. A plurality of tritium ion beamlets are extracted through spaced extraction apertures of a plasma electrode on the inner surface of the toroidal plasma chamber and directed inwardly toward the center of neutron generator. The beamlets pass through spaced acceleration and focusing electrodes to a neutron generating target at the center of neutron generator. The target is typically made of titanium tubing. Water is flowed through the tubing for cooling. The beam can be pulsed rapidly to achieve ultrashort neutron bursts. The target may be moved rapidly up and down so that the average power deposited on the surface of the target may be kept at a reasonable level. The neutron generator can produce fast neutrons from a T-T reaction which can be used for luggage and cargo interrogation applications. A luggage or cargo inspection system has a pulsed T-T neutron generator or source at the center, surrounded by associated gamma detectors and other components for identifying explosives or other contraband.

Leung, Ka-Ngo; Lou, Tak Pui

2005-03-22T23:59:59.000Z

344

Use of Slip Ring Induction Generator for Wind Power Generation  

E-Print Network [OSTI]

Wind energy is now firmly established as a mature technology for electricity generation. There are different types of generators that can be used for wind energy generation, among which Slip ring Induction generator proves to be more advantageous. To analyse application of Slip ring Induction generator for wind power generation, an experimental model is developed and results are studied. As power generation from natural sources is the need today and variable speed wind energy is ample in amount in India, it is necessary to study more beneficial options for wind energy generating techniques. From this need a model is developed by using Slip ring Induction generator which is a type of Asynchronous generator.

K Y Patil; D S Chavan

345

Wind power development -Status and perspectives  

E-Print Network [OSTI]

Wind power development - Status and perspectives Poul Erik Morthorst Risoe National Laboratory for the development of wind power, contributing to the Macro Task E1 on pro- duction cost for fusion and alternative on the development of the production costs for wind power, limited to turbines connected to the public grid

346

Solar Photovoltaics development -Status and perspectives  

E-Print Network [OSTI]

Solar Photovoltaics development - Status and perspectives J酶rgen Fenhann Ris酶 National Laboratory for the development of solar photovoltaics, contributing to the Macro Task E1 on production cost for fusion.S. with 53 MWp followed by Japan and EU. Until now off-grid installation have dominated the solar PV market

347

Status of Transuranic Bearing Metallic Fuel Development  

SciTech Connect (OSTI)

This paper summarizes the status of the metallic fuel development under the Advanced Fuel Cycle Initiative (AFCI). The metallic fuel development program includes fuel fabrication, characterization, advanced cladding research, irradiation testing and post-irradiation examination (PIE). The focus of this paper is on the recent irradiation experiments conducted in the Advanced Test Reactor and some PIE results from these tests.

Steve Hayes; Bruce Hilton; Heather MacLean; Debbie Utterbeck; Jon Carmack; Kemal Pasamehmetoglu

2009-09-01T23:59:59.000Z

348

STATUS OF SOLAR MODELS a JOHN BAHCALL  

E-Print Network [OSTI]

56 STATUS OF SOLAR MODELS a JOHN BAHCALL Institute for Advanced Study, Princeton, NJ 08540 M. H from 14 standard solar models published recently in refereed journals are inconsistent with the results of the 4 pioneering solar neutrino experiments if nothing happens to the neutrinos after they are created

Bahcall, John

349

DDT Certification Status Last Name First Name  

E-Print Network [OSTI]

DDT Certification Status Last Name First Name DDT Expire Date Abdelsamad Ramy 6-Jan-2016 16-Nov-2013 #12;Last Name First Name DDT Expire Date Arica Aimee Mintu 8-Apr-2015 Armstrong Gretchen #12;Last Name First Name DDT Expire Date Beckman Paul Allan 26-Apr-2015 Bejar Matthew Philip 22-Sep

350

The Population Status The American Alligator  

E-Print Network [OSTI]

Carolina by Thomas M. Murphy A Publication of the Savannah River Plant National Environmental Research Park'S SAVANNAH RIVER PLANT NATIONAL ENVIRONMENT RESEARCH PARK Copies may be obtained from Savannah River Ecology Laboratory #12;- The Population Status of the American Alligator on the Savannah River Plant, South Carolina

Georgia, University of

351

Fusion Ignition Research Experiment Engineering Status Report  

E-Print Network [OSTI]

of the world. The FIRE web site has been chosen as a selection for the Scout Report for Science and EngineeringFusion Ignition Research Experiment -FIRE- Engineering Status Report For Fiscal Year 2000 Issued on the Fusion Ignition Research Experiment (FIRE), a tokamak designed for burning plasma research. Engineering

352

STATUS OF THE NRC'S DECOMMISSIONING PROGRAM  

SciTech Connect (OSTI)

On July 21, 1997, the U.S. Nuclear Regulatory Commission published the final rule on Radiological Criteria for License Termination (the License Termination Rule) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program. It discusses the status of permanently shut-down commercial power reactors, complex decommissioning sites, and sites listed in the Site Decommissioning Management Plan. The paper provides the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including a Standard Review Plan for evaluating plans and information submitted by licensees to support the decommissioning of nuclear facilities and the D and D Screen software for determining the potential doses from residual radioactivity. Finally, it discusses the status of the staff's current efforts to streamline the decommissioning process.

Orlando, D. A.; Camper, L. W.; Buckley, J.

2002-02-25T23:59:59.000Z

353

LBNL-56380 (2004) 2004 Status Report  

E-Print Network [OSTI]

presents past and predicted savings for the ENERGY STAR 庐 labeling program, a program operated jointly for a subset of ENERGY STAR labeled products. We present estimates of the energy, dollar and carbon savingsLBNL-56380 (2004) 2004 Status Report Savings Estimates for the ENERGY STAR 庐 Voluntary Labeling

354

LBNL-56380 (2006) 2006 Status Report  

E-Print Network [OSTI]

;1 Introduction This paper presents past and predicted savings for the ENERGY STAR 庐 labeling program, a program for a subset of ENERGY STAR labeled products. We present estimates of the energy, dollar and carbon savingsLBNL-56380 (2006) 2006 Status Report Savings Estimates for the ENERGY STAR 庐 Voluntary Labeling

355

Current status of the US RERTR Program  

SciTech Connect (OSTI)

This paper describes the status of the RERTR Program. The main objective is to provide the audience with some orientation and sense of perspective that may assist in viewing the other program presentations as part of an overall effort, rather than as separate and unrelated activities.

Travelli, A.

1982-01-01T23:59:59.000Z

356

Mercury Nozzle Status V.B. Graves  

E-Print Network [OSTI]

. DEPARTMENT OF ENERGY Hg Jet Design Meeting 15 Nov 2004 Flow Issues High flow in small diameter thin-wall 15 Nov 2004 Design Issues Desire mechanically attached nozzle for changeout during cold testingMercury Nozzle Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004 #12;OAK

McDonald, Kirk

357

Neutrinoless Double $?$-Decay: Status and Future  

E-Print Network [OSTI]

A brief summary of the status of neutrino masses, mixing and oscillations is presented. Neutrinoless double $\\beta$-decay is considered. Predictions for the effective Majorana mass are reviewed. A possible test of the calculations of nuclear matrix elements of the $0\

S. M. Bilenky

2005-09-11T23:59:59.000Z

358

EBT-P project status report  

SciTech Connect (OSTI)

This Elmo Bumpy Torus Report describes the status of the EBT-P Project in September 1983 after phasedown of the Title II design effort. The report is intended to be a principle source of guidance in the event of a decision to resume work on the project.

Not Available

1983-11-01T23:59:59.000Z

359

Hg System Assembly and Testing Status  

E-Print Network [OSTI]

OF ENERGY Current Status / Next Steps 路 Populate secondary box ports 路 Complete plumbing inside secondary #12;2VRVS Meeting 1 Nov 2006 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Welding OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Cart Modifications 路 Secondary box center

McDonald, Kirk

360

3Compliance Status 2003 SITE ENVIRONMENTAL REPORT  

E-Print Network [OSTI]

3-1 3Compliance Status 2003 SITE ENVIRONMENTAL REPORT Brookhaven National Laboratory (BNL supply met all drinking water requirements. Groundwater monitoring at the Major Petroleum Facility reported to the New York State Department of Environmental Conservation (NYSDEC). Twenty-two reportable

Homes, Christopher C.

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

DIGITAL SOIL RESOURCE INVENTORIES: STATUS AND PROSPECTS  

E-Print Network [OSTI]

DIGITAL SOIL RESOURCE INVENTORIES: STATUS AND PROSPECTS D G Rossiter Department of Earth Systems an inventory of digital soils data and supporting information available or publicized on the World Wide Web-scale inventories, especially using the SOTER methodology. Large-scale digital data are limited to the USA, Canada

Rossiter, D G "David"

362

Fuel Cell Technology Status - Voltage Degradation (Presentation)  

SciTech Connect (OSTI)

This presentation describes an independent assessment of fuel cell durability status and discusses the project's relevance to the Department of Energy Hydrogen and Fuel Cells Program; NREL's analysis approach; the FY12 technical accomplishments including the fourth annual publication of results; and project collaborations and future work.

Kurtz, J.; Wipke,; Sprik, S.; Saur, G.

2012-06-01T23:59:59.000Z

363

Compliance status report for the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is responsible for the disposition of transuranic (TRU) waste generated through national defense-related activities. Approximately 53,700 m{sup 2} of these wastes have been generated and are currently stored at government defense installations across the country. The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been sited and constructed to meet the criteria established by the scientific and regulatory community for the safe, long-term disposal of TRU and TRU-mixed wastes. This Compliance Status Report (CSR) provides an assessment of the progress of the WIPP Program toward compliance with long-term disposal regulations, set forth in Title 40 CFR 191 (EPA, 1993a), Subparts B and C, and Title 40 CFR {section}268.6 (EPA, 1993b), in order to focus on-going and future experimental and engineering activities. The CSR attempts to identify issues associated with the performance of the WIPP as a long-term repository and to focus on the resolution of these issues. This report will serve as a tool to focus project resources on the areas necessary to ensure complete, accurate, and timely submittal of the compliance application. This document is not intended to constitute a statement of compliance or a demonstration of compliance.

Not Available

1994-03-31T23:59:59.000Z

364

The Mixed Waste Focus Area: Status and accomplishments  

SciTech Connect (OSTI)

The Mixed Waste Focus Area began operations in February of 1995. Its mission is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments, and regulators. The MWFA will develop, demonstrate, and deliver implementable technologies for treatment of mixed waste within the DOE complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation, and disposal. The MWFA`s mission arises from the Resources Conservation and Recovery Act (RCRA) as amended by the Federal Facility Compliance Act. Each DOE site facility that generates or stores mixed waste prepared a plan, the Site Treatment Plan, for developing treatment capacities and treating that waste. Agreements for each site were concluded with state regulators, resulting in Consent Orders providing enforceable milestones for achieving treatment of the waste. The paper discusses the implementation of the program, its status, accomplishments and goals for FY1996, and plans for 1997.

Conner, J.E. [Dept. of Energy, Idaho Falls, ID (United States). Idaho Operations Office; Williams, R.E. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)

1997-08-01T23:59:59.000Z

365

Graph Generator Survey  

SciTech Connect (OSTI)

The benchmarking effort within the Extreme Scale Systems Center at Oak Ridge National Laboratory seeks to provide High Performance Computing benchmarks and test suites of interest to the DoD sponsor. The work described in this report is a part of the effort focusing on graph generation. A previously developed benchmark, SystemBurn, allowed the emulation of dierent application behavior profiles within a single framework. To complement this effort, similar capabilities are desired for graph-centric problems. This report examines existing synthetic graph generator implementations in preparation for further study on the properties of their generated synthetic graphs.

Lothian, Josh [ORNL; Powers, Sarah S [ORNL; Sullivan, Blair D [ORNL; Baker, Matthew B [ORNL; Schrock, Jonathan [ORNL; Poole, Stephen W [ORNL

2013-12-01T23:59:59.000Z

366

Synthetic guide star generation  

DOE Patents [OSTI]

A system for assisting in observing a celestial object and providing synthetic guide star generation. A lasing system provides radiation at a frequency at or near 938 nm and radiation at a frequency at or near 1583 nm. The lasing system includes a fiber laser operating between 880 nm and 960 nm and a fiber laser operating between 1524 nm and 1650 nm. A frequency-conversion system mixes the radiation and generates light at a frequency at or near 589 nm. A system directs the light at a frequency at or near 589 nm toward the celestial object and provides synthetic guide star generation.

Payne, Stephen A. (Castro Valley, CA) [Castro Valley, CA; Page, Ralph H. (Castro Valley, CA) [Castro Valley, CA; Ebbers, Christopher A. (Livermore, CA) [Livermore, CA; Beach, Raymond J. (Livermore, CA) [Livermore, CA

2008-06-10T23:59:59.000Z

367

Status & solidarity through codeswitching: three plays by Dolores Prida  

E-Print Network [OSTI]

the format of the American Psychologist. 2 works. Furthermore, when analyzed using the status and solidarity framework, an emphasis on the solidarity or intimacy between characters rather than on the status of the relationships is expected. When...

Anderson, Sheri L.

2004-09-30T23:59:59.000Z

368

Wisconsin Agriculture Status of the Wisconsin Farm Economy  

E-Print Network [OSTI]

STATUS OF Wisconsin Agriculture 2010 路 Status of the Wisconsin Farm Economy 路 Current Outlook: Farm Products, Farm Inputs and the General Economy 路 Framing the Financial Crisis for Wisconsin Agriculture Farm Economy . . . . . . 1 II. Current Outlook . . . . . . . . . . . . . . . . . . . . . . . . 7

Radeloff, Volker C.

369

Generating electricity from viruses  

SciTech Connect (OSTI)

Berkeley Lab's Seung-Wuk Lee discusses "Generating electricity from viruses" in this Oct. 28, 2013 talk, which is part of a Science at the Theater event entitled Eight Big Ideas.

Lee, Seung-Wuk

2013-10-31T23:59:59.000Z

370

Energy and Mass Generation  

E-Print Network [OSTI]

Modifications in the energy momentum dispersion laws due to a noncommutative geometry, have been considered in recent years. We examine the oscillations of extended objects in this perspective and find that there is now a "generation" of energy.

Burra G. Sidharth

2010-03-11T23:59:59.000Z

371

Contextualizing generative design  

E-Print Network [OSTI]

Generative systems have been widely used to produce two- and three-dimensional constructs, in an attempt to escape from our preconceptions and pre-existing spatial language. The challenge is to use this mechanism in ...

Arida, Saeed, 1977-

2004-01-01T23:59:59.000Z

372

Monte Carlo event generators  

SciTech Connect (OSTI)

I review recent progress in the physics of parton shower Monte Carlos, emphasizing the ideas which allow the inclusion of higher-order matrix elements into the framework of event generators.

Frixione, Stefano [INFN, Sezione di Genova, Via Dodecaneso 33, 16146 Genova (Italy)

2005-10-06T23:59:59.000Z

373

Generating electricity from viruses  

ScienceCinema (OSTI)

Berkeley Lab's Seung-Wuk Lee discusses "Generating electricity from viruses" in this Oct. 28, 2013 talk, which is part of a Science at the Theater event entitled Eight Big Ideas.

Lee, Seung-Wuk

2014-06-23T23:59:59.000Z

374

Oscillating fluid power generator  

SciTech Connect (OSTI)

A system and method for harvesting the kinetic energy of a fluid flow for power generation with a vertically oriented, aerodynamic wing structure comprising one or more airfoil elements pivotably attached to a mast. When activated by the moving fluid stream, the wing structure oscillates back and forth, generating lift first in one direction then in the opposite direction. This oscillating movement is converted to unidirectional rotational movement in order to provide motive power to an electricity generator. Unlike other oscillating devices, this device is designed to harvest the maximum aerodynamic lift forces available for a given oscillation cycle. Because the system is not subjected to the same intense forces and stresses as turbine systems, it can be constructed less expensively, reducing the cost of electricity generation. The system can be grouped in more compact clusters, be less evident in the landscape, and present reduced risk to avian species.

Morris, David C

2014-02-25T23:59:59.000Z

375

Vector generator scan converter  

DOE Patents [OSTI]

High printing speeds for graphics data are achieved with a laser printer by transmitting compressed graphics data from a main processor over an I/O channel to a vector generator scan converter which reconstructs a full graphics image for input to the laser printer through a raster data input port. The vector generator scan converter includes a microprocessor with associated microcode memory containing a microcode instruction set, a working memory for storing compressed data, vector generator hardware for drawing a full graphic image from vector parameters calculated by the microprocessor, image buffer memory for storing the reconstructed graphics image and an output scanner for reading the graphics image data and inputting the data to the printer. The vector generator scan converter eliminates the bottleneck created by the I/O channel for transmitting graphics data from the main processor to the laser printer, and increases printer speed up to thirty fold. 7 figs.

Moore, J.M.; Leighton, J.F.

1988-02-05T23:59:59.000Z

376

Vector generator scan converter  

DOE Patents [OSTI]

High printing speeds for graphics data are achieved with a laser printer by transmitting compressed graphics data from a main processor over an I/O (input/output) channel to a vector generator scan converter which reconstructs a full graphics image for input to the laser printer through a raster data input port. The vector generator scan converter includes a microprocessor with associated microcode memory containing a microcode instruction set, a working memory for storing compressed data, vector generator hardward for drawing a full graphic image from vector parameters calculated by the microprocessor, image buffer memory for storing the reconstructed graphics image and an output scanner for reading the graphics image data and inputting the data to the printer. The vector generator scan converter eliminates the bottleneck created by the I/O channel for transmitting graphics data from the main processor to the laser printer, and increases printer speed up to thirty fold.

Moore, James M. (Livermore, CA); Leighton, James F. (Livermore, CA)

1990-01-01T23:59:59.000Z

377

Steam generator tube failures  

SciTech Connect (OSTI)

A review and summary of the available information on steam generator tubing failures and the impact of these failures on plant safety is presented. The following topics are covered: pressurized water reactor (PWR), Canadian deuterium uranium (CANDU) reactor, and Russian water moderated, water cooled energy reactor (VVER) steam generator degradation, PWR steam generator tube ruptures, the thermal-hydraulic response of a PWR plant with a faulted steam generator, the risk significance of steam generator tube rupture accidents, tubing inspection requirements and fitness-for-service criteria in various countries, and defect detection reliability and sizing accuracy. A significant number of steam generator tubes are defective and are removed from service or repaired each year. This wide spread damage has been caused by many diverse degradation mechanisms, some of which are difficult to detect and predict. In addition, spontaneous tube ruptures have occurred at the rate of about one every 2 years over the last 20 years, and incipient tube ruptures (tube failures usually identified with leak detection monitors just before rupture) have been occurring at the rate of about one per year. These ruptures have caused complex plant transients which have not always been easy for the reactor operators to control. Our analysis shows that if more than 15 tubes rupture during a main steam line break, the system response could lead to core melting. Although spontaneous and induced steam generator tube ruptures are small contributors to the total core damage frequency calculated in probabilistic risk assessments, they are risk significant because the radionuclides are likely to bypass the reactor containment building. The frequency of steam generator tube ruptures can be significantly reduced through appropriate and timely inspections and repairs or removal from service.

MacDonald, P.E.; Shah, V.N.; Ward, L.W.; Ellison, P.G.

1996-04-01T23:59:59.000Z

378

Software Safety Tutorial Status Update 1 Software Safety Tutorial  

E-Print Network [OSTI]

Software Safety Tutorial Status Update 1 Software Safety Tutorial (Status Update) Jeff Tian, tian@engr.smu.edu CSE, SMU, Dallas, TX 75275 Topics 路 Project Overview 路 Software Safety Overview 路 Project Tasks/Schedule/Progress Jeff Tian August 31, 2007 #12;Software Safety Tutorial Status Update 2 What Is Software Safety

Tian, Jeff

379

AGRICULTURE, 2004 Status of the Wisconsin Farm Economy  

E-Print Network [OSTI]

STATUS OF WISCONSIN AGRICULTURE, 2004 Status of the Wisconsin Farm Economy Situation and Outlook Situation: Implications for U.S. Agriculture 路 The Evolution and Current Status of Livestock Production and Meat Processing in Wisconsin Department of Agricultural and Applied Economics College of Agricultural

Radeloff, Volker C.

380

Wisconsin Agriculture Status of the Wisconsin Farm Economy  

E-Print Network [OSTI]

STATUS OF Wisconsin Agriculture 2011 路 Status of the Wisconsin Farm Economy 路 Current Outlook: Farm of Agricultural and Applied Economics College of Agricultural and Life Sciences University of Wisconsin-Madison Cooperative Extension University of Wisconsin-Extension #12;Status of Wisconsin Agriculture, 2011 An annual

Radeloff, Volker C.

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Quarterly Construction Status Report Period Ending: June 30, 2013  

E-Print Network [OSTI]

Quarterly Construction Status Report Period Ending: June 30, 2013 Storrs and Regional Campuses University of Connecticut Health Center Quarterly Construction Status Report for Period Ending: June 30, 2013 #12;Quarterly Construction Status Report Period Ending: June 30, 2013 Project Number Project Index

Alpay, S. Pamir

382

Contests for Status Benny Moldovanu, Aner Sela and Xianwen Shi  

E-Print Network [OSTI]

. Finally, we modify the model to allow for status categories that are endogenously determined by monetary with a sliding scale of status determined by precisely de...ned ranges of measured output (fruit, grain, oil, etc pointed out that social status may play a role also in market exchanges.6 Nevertheless, the literature

Franz, Sven Oliver

383

Quarterly Construction Status Report Period Ending: March 31, 2014  

E-Print Network [OSTI]

Quarterly Construction Status Report Period Ending: March 31, 2014 Storrs and Regional Campuses University of Connecticut Health Center Quarterly Construction Status Report for Period Ending: March 31, 2014 #12;Quarterly Construction Status Report Period Ending: March 31, 2014 Project Number Project

Alpay, S. Pamir

384

STATUS OF MUNICIPAL SOLID WASTE GENERATION IN KERALA AND THEIR CHARACTERISTICS  

E-Print Network [OSTI]

and management capacity of the existing waste management systems. Therefore, there is an urgent necessity of improved planning and implementation of comprehensive MSW management systems for upgrading, transportation, processing and disposal system. It requires reliable data on quantity and quality of MSW

Columbia University

385

Marine Tidal Current Electric Power Generation Technology: State of the Art and Current Status  

E-Print Network [OSTI]

resurgence in development of renewable ocean energy technology. Therefore, several demonstration projects appreciated as a vast renewable energy source. The energy is stored in oceans partly as thermal energy, partly categories: wave energy, marine and tidal current energy, ocean thermal energy, energy from salinity

Paris-Sud XI, Universit茅 de

386

Sixth Power Plan northwest Power and Conservation Council  

E-Print Network [OSTI]

's loads 路 Bonneville sells wholesale power to over 120 publicly-owned utilities 路 Variability in hydro generation led to development of the nation's first major spot market for wholesale power 路 Bonneville built and wholesale power are low 路 Retirement of coal-fired plants have been announced; will require development

387

Economic Impacts of Losing the Fruit Fly Trapping Program  

E-Print Network [OSTI]

is generated off-farm in input supply, transportation, finance, real estate, health care, wholesale health care, 354 jobs; food, beverages and retail, 564 jobs; wholesale, transport and warehousing, 233 support activities, $18.1 million; wholesale trade, $6.9 million; real estate, $12.6 million

388

MHD Generating system  

DOE Patents [OSTI]

According to the present invention, coal combustion gas is the primary working fluid and copper or a copper alloy is the electrodynamic fluid in the MHD generator, thereby eliminating the heat exchangers between the combustor and the liquid-metal MHD working fluids, allowing the use of a conventional coalfired steam bottoming plant, and making the plant simpler, more efficient and cheaper. In operation, the gas and liquid are combined in a mixer and the resulting two-phase mixture enters the MHD generator. The MHD generator acts as a turbine and electric generator in one unit wherein the gas expands, drives the liquid across the magnetic field and thus generates electrical power. The gas and liquid are separated, and the available energy in the gas is recovered before the gas is exhausted to the atmosphere. Where the combustion gas contains sulfur, oxygen is bubbled through a side loop to remove sulfur therefrom as a concentrated stream of sulfur dioxide. The combustor is operated substoichiometrically to control the oxide level in the copper.

Petrick, Michael (Joliet, IL); Pierson, Edward S. (Chicago, IL); Schreiner, Felix (Mokena, IL)

1980-01-01T23:59:59.000Z

389

Superconducting thermoelectric generator  

DOE Patents [OSTI]

Thermoelectricity is produced by applying a temperature differential to dissimilar electrically conducting or semiconducting materials, thereby producing a voltage that is proportional to the temperature difference. Thermoelectric generators use this effect to directly convert heat into electricity; however, presently-known generators have low efficiencies due to the production of high currents which in turn cause large resistive heating losses. Some thermoelectric generators operate at efficiencies between 4% and 7% in the 800{degrees} to 1200{degrees}C range. According to its major aspects and bradly stated, the present invention is an apparatus and method for producing electricity from heat. In particular, the invention is a thermoelectric generator that juxtaposes a superconducting material and a semiconducting material - so that the superconducting and the semiconducting materials touch - to convert heat energy into electrical energy without resistive losses in the temperature range below the critical temperature of the superconducting material. Preferably, an array of superconducting material is encased in one of several possible configurations within a second material having a high thermal conductivity, preferably a semiconductor, to form a thermoelectric generator.

Metzger, J.D.; El-Genk, M.S.

1994-01-01T23:59:59.000Z

390

Annual Hanford Site Environmental Permitting Status Report  

SciTech Connect (OSTI)

The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year.

HOMAN, N.A.

2000-10-01T23:59:59.000Z

391

Fossil energy waste management. Technology status report  

SciTech Connect (OSTI)

This report describes the current status and recent accomplishments of the Fossil Energy Waste Management (FE WM) projects sponsored by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The primary goal of the Waste Management Program is to identify and develop optimal strategies to manage solid by-products from advanced coal technologies for the purpose of ensuring the competitiveness of advanced coal technologies as a future energy source. The projects in the Fossil Energy Waste Management Program are divided into three types of activities: Waste Characterization, Disposal Technologies, and Utilization Technologies. This technology status report includes a discussion on barriers to increased use of coal by-products. Also, the major technical and nontechnical challenges currently being addressed by the FE WM program are discussed. A bibliography of 96 citations and a list of project contacts is included if the reader is interested in obtaining additional information about the FE WM program.

Bossart, S.J.; Newman, D.A.

1995-02-01T23:59:59.000Z

392

Nova power systems: status and operating experience  

SciTech Connect (OSTI)

This paper describes the pulse power systems that are used in these lasers; the status and the operating experiences. The pulsed power system for the Nova Laser is comprised of several distinct technology areas. The large capacitor banks for driving flashlamps that excite the laser glass is one area, the fast pulsers that drive pockels cell shutters is another area, and the contol system for the pulsed power is a third. This paper discusses the capacitor banks and control systems.

Whitham, K.; Merritt, B.T.; Gritton, D.G.; Smart, A.J.; Holloway, R.W.; Oicles, J.A.

1983-11-28T23:59:59.000Z

393

Smart Grid Status and Metrics Report  

SciTech Connect (OSTI)

To convey progress made in achieving the vision of a smart grid, this report uses a set of six characteristics derived from the National Energy Technology Laboratory Modern Grid Strategy. It measures 21 metrics to provide insight into the grid抯 capacity to embody these characteristics. This report looks across a spectrum of smart grid concerns to measure the status of smart grid deployment and impacts.

Balducci, Patrick J.; Weimar, Mark R.; Kirkham, Harold

2014-07-01T23:59:59.000Z

394

Non-metric gravity: A status report  

E-Print Network [OSTI]

We review the status of a certain (infinite) class of four-dimensional generally covariant theories propagating two degrees of freedom that are formulated without any direct mention of the metric. General relativity itself (in its Plebanski formulation) belongs to the class, so these theories are examples of modified gravity. We summarize the current understanding of the nature of the modification, of the renormalizability properties of these theories, of their coupling to matter fields, and describe some of their physical properties.

Kirill Krasnov

2007-11-05T23:59:59.000Z

395

ACRF Instrumentation Status and Information - June 2009  

SciTech Connect (OSTI)

The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

JW Voyles

2009-06-01T23:59:59.000Z

396

ACRF Instrumentation Status and Information September 2009  

SciTech Connect (OSTI)

The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

JW Voyles

2009-10-01T23:59:59.000Z

397

ACRF Instrumentation Status and Information July 2009  

SciTech Connect (OSTI)

The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

JW Voyles

2009-08-13T23:59:59.000Z

398

ACRF Instrumentation Status and Information April 2009  

SciTech Connect (OSTI)

The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

JW Voyles

2009-05-07T23:59:59.000Z

399

ACRF Instrumentation Status and Information August 2009  

SciTech Connect (OSTI)

The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

JW Voyles

2009-09-09T23:59:59.000Z

400

ACRF Instrumentation Status and Information May 2009  

SciTech Connect (OSTI)

The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

JW Voyles

2009-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

ARM - Value-Added Product Status Reports  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUCProductstwrmr DocumentationProductsaodsasheniraod DocumentationSuggestionStatus

402

Monthly Status Reports | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |EnergyonSupport0.pdf5 OPAM SEMIANNUAL REPORTMAMayCrossColorado |ProgramsMonthly Status

403

Spherical neutron generator  

DOE Patents [OSTI]

A spherical neutron generator is formed with a small spherical target and a spherical shell RF-driven plasma ion source surrounding the target. A deuterium (or deuterium and tritium) ion plasma is produced by RF excitation in the plasma ion source using an RF antenna. The plasma generation region is a spherical shell between an outer chamber and an inner extraction electrode. A spherical neutron generating target is at the center of the chamber and is biased negatively with respect to the extraction electrode which contains many holes. Ions passing through the holes in the extraction electrode are focused onto the target which produces neutrons by D-D or D-T reactions.

Leung, Ka-Ngo

2006-11-21T23:59:59.000Z

404

Thermoacoustic magnetohydrodynamic electrical generator  

DOE Patents [OSTI]

A thermoacoustic magnetohydrodynamic electrical generator includes an intrinsically irreversible thermoacoustic heat engine coupled to a magnetohydrodynamic electrical generator. The heat engine includes an electrically conductive liquid metal as the working fluid and includes two heat exchange and thermoacoustic structure assemblies which drive the liquid in a push-pull arrangement to cause the liquid metal to oscillate at a resonant acoustic frequency on the order of 1000 Hz. The engine is positioned in the field of a magnet and is oriented such that the liquid metal oscillates in a direction orthogonal to the field of the magnet, whereby an alternating electrical potential is generated in the liquid metal. Low-loss, low-inductance electrical conductors electrically connected to opposite sides of the liquid metal conduct an output signal to a transformer adapted to convert the low-voltage, high-current output signal to a more usable higher voltage, lower current signal.

Wheatley, J.C.; Swift, G.W.; Migliori, A.

1984-11-16T23:59:59.000Z

405

Hyperbolic Graph Generator  

E-Print Network [OSTI]

Networks representing many complex systems in nature and society share some common structural properties like heterogeneous degree distributions and strong clustering. Recent research on network geometry has shown that those real networks can be adequately modeled as random geometric graphs in hyperbolic spaces. In this paper, we present a computer program to generate such graphs. Besides real-world-like networks, the program can generate random graphs from other well-known graph ensembles, such as the soft configuration model, random geometric graphs on a circle, or Erd\\H{o}s-R\\'enyi random graphs. The simulations show a good match between the expected values of different network structural properties and the corresponding empirical values measured in generated graphs, confirming the accurate behavior of the program.

Aldecoa, Rodrigo; Krioukov, Dmitri

2015-01-01T23:59:59.000Z

406

Thermoacoustic magnetohydrodynamic electrical generator  

DOE Patents [OSTI]

A thermoacoustic magnetohydrodynamic electrical generator includes an intrinsically irreversible thermoacoustic heat engine coupled to a magnetohydrodynamic electrical generator. The heat engine includes an electrically conductive liquid metal as the working fluid and includes two heat exchange and thermoacoustic structure assemblies which drive the liquid in a push-pull arrangement to cause the liquid metal to oscillate at a resonant acoustic frequency on the order of 1,000 Hz. The engine is positioned in the field of a magnet and is oriented such that the liquid metal oscillates in a direction orthogonal to the field of the magnet, whereby an alternating electrical potential is generated in the liquid metal. Low-loss, low-inductance electrical conductors electrically connected to opposite sides of the liquid metal conduct an output signal to a transformer adapted to convert the low-voltage, high-current output signal to a more usable higher voltage, lower current signal.

Wheatley, John C. (Los Alamos, NM); Swift, Gregory W. (Los Alamos, NM); Migliori, Albert (Santa Fe, NM)

1986-01-01T23:59:59.000Z

407

Impacts of Large-Scale Wind Generators Penetration on the Voltage Stability of Power Systems  

E-Print Network [OSTI]

development of wind energy tech- nology and the current world-wide status of grid-connected as well as standImpacts of Large-Scale Wind Generators Penetration on the Voltage Stability of Power Systems M. J systems and their dynamic behaviours to identify critical issues that limit the large-scale integration

Pota, Himanshu Roy

408

External split field generator  

DOE Patents [OSTI]

A generator includes a coil disposed about a core. A first stationary magnetic field source may be disposed on a first end portion of the core and a second stationary magnetic field source may be disposed on a second end portion of core. The first and second stationary magnetic field sources apply a stationary magnetic field to the coil. An external magnetic field source may be disposed outside the coil to apply a moving magnetic field to the coil. Electrical energy is generated in response to an interaction between the coil, the moving magnetic field, and the stationary magnetic field.

Thundat, Thomas George (Knoxville, TN); Van Neste, Charles W. (Kingston, TN); Vass, Arpad Alexander (Oak Ridge, TN)

2012-02-21T23:59:59.000Z

409

PowerPoint Presentation  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Small Generator Interconnection Procedure (SGIP) that governs the interconnection of wholesale generators * Lowers the cost of interconnection through a "Fast Track" process,...

410

Options for Generating Steam Efficiently  

E-Print Network [OSTI]

This paper describes how plant engineers can efficiently generate steam when there are steam generators and Heat Recovery Steam Generators in their plant. The process consists of understanding the performance characteristics of the various equipment...

Ganapathy, V.

411

The Generation Effect and Memory  

E-Print Network [OSTI]

M. A. (2007). The generation effect: A meta- analyticBjork, R. A. (1988). The generation effect: Support for aE. J. (2012). The next generation: The value of reminding.

Rosner, Zachary Alexander

2012-01-01T23:59:59.000Z

412

Aftertreatment Modeling Status, Futur Potential, and Application...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

States Future Diesel Engine Thermal Efficiency Improvement andn Emissions Control Technology Model-Based Transient Calibration Optimization for Next Generation Diesel Engines...

413

Code Generation on Steroids: Enhancing COTS Code Generators via Generative Aspects  

E-Print Network [OSTI]

Code Generation on Steroids: Enhancing COTS Code Generators via Generative Aspects Cody Henthorne tilevich@cs.vt.edu Abstract Commercial of-the-shelf (COTS) code generators have become an integral part of modern commercial software development. Programmers use code generators to facilitate many tedious

Ryder, Barbara G.

414

Generating Resources Advisory Committee  

E-Print Network [OSTI]

Capital and O&M Cost Estimates 10:15 am Reciprocating Engine Technologies John Robbins of Wartsila North) Capital Cost ($/kW) Heat Rate (Btu/kWh) Ramp Rate (Minutes) Biggest Most expensive Least Efficient SlowestGenerating Resources Advisory Committee February 27, 2014 Steven Simmons and Gillian Charles

415

New wave generation  

E-Print Network [OSTI]

We present the results of a combined experimental and numerical study of the generation of internal waves using the novel internal wave generator design of Gostiaux et al. (2007). This mechanism, which involves a tunable source comprised of oscillating plates, has so far been used for a few fundamental studies of internal waves, but its full potential has yet to be realized. Our studies reveal that this approach is capable of producing a wide variety of two-dimensional wave fields, including plane waves, wave beams and discrete vertical modes in finite-depth stratifications. The effects of discretization by a finite number of plates, forcing amplitude and angle of propagation are investigated, and it is found that the method is remarkably efficient at generating a complete wave field despite forcing only one velocity component in a controllable manner. We furthermore find that the nature of the radiated wave field is well predicted using Fourier transforms of the spatial structure of the wave generator.

Mercier, Matthieu J; Mathur, Manikandan; Gostiaux, Louis; Peacock, Thomas; Dauxois, Thierry

2015-01-01T23:59:59.000Z

416

Iridium 191-M generator  

DOE Patents [OSTI]

Potassium osmate, of the formula K.sub.2 Os O.sub.2 (OH).sub.4), used to make a column for the generation of Ir-191 m, which is used in first pass angiography to detect cardiac defects in patients.

Treves, Salvador (Newton, MA); Cheng, Chris C. (Brookline, MA)

1988-03-08T23:59:59.000Z

417

Energy generation in stars  

E-Print Network [OSTI]

It is a current opinion that thermonuclear fusion is the main source of the star activity. It is shown below that this source is not unique. There is another electrostatic mechanism of the energy generation which accompanies thermonuclear fusion. Probably, this approach can solve the solar neutrino problem.

B. V. Vasiliev

2001-10-29T23:59:59.000Z

418

Fuel cell generator  

DOE Patents [OSTI]

High temperature solid oxide electrolyte fuel cell generators which allow controlled leakage among plural chambers in a sealed housing. Depleted oxidant and fuel are directly reacted in one chamber to combust remaining fuel and preheat incoming reactants. The cells are preferably electrically arranged in a series-parallel configuration.

Isenberg, Arnold O. (Forest Hills, PA)

1983-01-01T23:59:59.000Z

419

Nuclear Power Generating Facilities (Maine)  

Broader source: Energy.gov [DOE]

The first subchapter of the statute concerning Nuclear Power Generating Facilities provides for direct citizen participation in the decision to construct any nuclear power generating facility in...

420

Next-Generation Photovoltaic Technologies  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Next-Generation Photovoltaic Technologies Next-Generation Photovoltaic Technologies Print Monday, 06 February 2012 15:48 Organic solar cells based on the polymerfullerene bulk...

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Arnold Schwarzenegger DISTRIBUTED GENERATION DRIVETRAIN  

E-Print Network [OSTI]

Arnold Schwarzenegger Governor DISTRIBUTED GENERATION DRIVETRAIN FOR WINDPOWER APPLICATION Prepared GENERATION DRIVETRAIN FOR WINDPOWER APPLICATION EISG AWARDEE Dehlsen Associates, LLC 7985 Armas Canyon Road

422

GENERATION AND RANDOM GENERATION: FROM SIMPLE GROUPS TO MAXIMAL SUBGROUPS  

E-Print Network [OSTI]

GENERATION AND RANDOM GENERATION: FROM SIMPLE GROUPS TO MAXIMAL SUBGROUPS TIMOTHY C. BURNESS of generators for G. It is well known that d(G) = 2 for all (non-abelian) finite simple groups. We prove that d investigate the random generation of maximal subgroups of simple and almost simple groups. By applying

Burness, Tim

423

Axion helioscopes update: the status of CAST and IAXO  

E-Print Network [OSTI]

Almost 35 years since their suggestion as a good solution to the strong CP-problem, axions remain one of the few viable candidates for the Dark Matter, although still eluding detection. Most of the methods for their detection are based on their coupling to photons, one of the most sensitive ones being the helioscope technique. We report on the current status of the CERN Axion Solar Telescope and the future International Axion Observatory (IAXO). Recent results from the second part of CAST phase II, where the magnet bores were filled with 3He gas at variable pressure achieving sensibilities on the axion mass up to 1.2 eV, are presented. Currently, CAST is expecting to improve its sensitivity to solar axions with rest mass below 0.02 eV/c^2 after the upgrade of the X-ray detectors and with the implementation of a second X-ray optic. At the same time, it is exploring other possibilities at the low energy physics frontier. On the other hand IAXO, the fourth generation axion helioscope, aims to improve CAST's perf...

Dafni, T

2015-01-01T23:59:59.000Z

424

Axion helioscopes update: the status of CAST and IAXO  

E-Print Network [OSTI]

Almost 35 years since their suggestion as a good solution to the strong CP-problem, axions remain one of the few viable candidates for the Dark Matter, although still eluding detection. Most of the methods for their detection are based on their coupling to photons, one of the most sensitive ones being the helioscope technique. We report on the current status of the CERN Axion Solar Telescope and the future International Axion Observatory (IAXO). Recent results from the second part of CAST phase II, where the magnet bores were filled with 3He gas at variable pressure achieving sensibilities on the axion mass up to 1.2 eV, are presented. Currently, CAST is expecting to improve its sensitivity to solar axions with rest mass below 0.02 eV/c^2 after the upgrade of the X-ray detectors and with the implementation of a second X-ray optic. At the same time, it is exploring other possibilities at the low energy physics frontier. On the other hand IAXO, the fourth generation axion helioscope, aims to improve CAST's performance in terms of axion-photon coupling by 1-1.5 orders of magnitude. The details of the project building a dedicated magnet, optics and X-ray detectors are given.

T. Dafni; F. J. Iguaz; on behalf of the CAST; IAXO collaborations

2015-01-07T23:59:59.000Z

425

US/UK Loan Account Project Status PMOD477  

SciTech Connect (OSTI)

The viewgraphs describe the status of PMOD477 for LANL. The meeting will occur at DOE-HQ with NA-11 and Military Applications personnel in attendance. Serves to repatriate material with a balance to zero by December 2012. Phase 1 -- Establish formality of operations for War Reserve (WR): Complete surrogate taskings to A90 through a Materials Channel and perform US/UK lessons learned; Complete the US/UK agreed Quality Acceptance Plan, Materials Plan, Shipping procedure, and establish the formal UK/US point of contacts. Phase 2 -- Metal Manufacture (WR): Process material and store material as electrorefined metal (ER) rings, with initial assay and isotopic analysis, prior to manufacturing. Material is cast into accepted configuration and appropriate acceptance document for each aliquot will be generated. Phase 3 -- Intermediate Material Manufacture, Packaging and Shipping (WR): Continue processing of the material in accepted configuration with appropriate acceptance documentation for each aliquot. Provide an initial tasking of the material owed to UK including appropriate quality acceptance documentation. Phase 4 -- Complete Tasking (WR). Phase 5 -- Residue Processing (Non-WR): Complete processing of residue material and waste into accepted configuration with appropriate acceptance document for disposal.

Stevens, Patrice A. [Los Alamos National Laboratory

2012-07-12T23:59:59.000Z

426

Calibrated vapor generator source  

DOE Patents [OSTI]

A portable vapor generator is disclosed that can provide a controlled source of chemical vapors, such as, narcotic or explosive vapors. This source can be used to test and calibrate various types of vapor detection systems by providing a known amount of vapors to the system. The vapor generator is calibrated using a reference ion mobility spectrometer. A method of providing this vapor is described, as follows: explosive or narcotic is deposited on quartz wool, placed in a chamber that can be heated or cooled (depending on the vapor pressure of the material) to control the concentration of vapors in the reservoir. A controlled flow of air is pulsed over the quartz wool releasing a preset quantity of vapors at the outlet. 10 figs.

Davies, J.P.; Larson, R.A.; Goodrich, L.D.; Hall, H.J.; Stoddard, B.D.; Davis, S.G.; Kaser, T.G.; Conrad, F.J.

1995-09-26T23:59:59.000Z

427

Dependable Hydrogen and Industrial Heat Generation from the Next Generation Nuclear Plant  

SciTech Connect (OSTI)

The Department of Energy is working with industry to develop a next generation, high-temperature gas-cooled nuclear reactor (HTGR) as a part of the effort to supply the US with abundant, clean and secure energy. The Next Generation Nuclear Plant (NGNP) project, led by the Idaho National Laboratory, will demonstrate the ability of the HTGR to generate hydrogen, electricity, and high-quality process heat for a wide range of industrial applications. Substituting HTGR power for traditional fossil fuel resources reduces the cost and supply vulnerability of natural gas and oil, and reduces or eliminates greenhouse gas emissions. As authorized by the Energy Policy Act of 2005, industry leaders are developing designs for the construction of a commercial prototype producing up to 600 MWt of power by 2021. This paper describes a variety of critical applications that are appropriate for the HTGR with an emphasis placed on applications requiring a clean and reliable source of hydrogen. An overview of the NGNP project status and its significant technology development efforts are also presented.

Charles V. Park; Michael W. Patterson; Vincent C. Maio; Piyush Sabharwall

2009-03-01T23:59:59.000Z

428

High power microwave generator  

DOE Patents [OSTI]

A microwave generator efficiently converts the energy of an intense relativistic electron beam (REB) into a high-power microwave emission using the Smith-Purcell effect which is related to Cerenkov radiation. Feedback for efficient beam bunching and high gain is obtained by placing a cylindrical Smith-Purcell transmission grating on the axis of a toroidal resonator. High efficiency results from the use of a thin cold annular highly-magnetized REB that is closely coupled to the resonant structure.

Ekdahl, C.A.

1983-12-29T23:59:59.000Z

429

QCD (&) event generators  

SciTech Connect (OSTI)

Recent developments in QCD phenomenology have spurred on several improved approaches to Monte Carlo event generation, relative to the post-LEP state of the art. In this brief review, the emphasis is placed on approaches for (1) consistently merging fixed-order matrix element calculations with parton shower descriptions of QCD radiation, (2) improving the parton shower algorithms themselves, and (3) improving the description of the underlying event in hadron collisions.

Skands, Peter Z.; /Fermilab

2005-07-01T23:59:59.000Z

430

The SLC control system - status and development  

SciTech Connect (OSTI)

The SLC control system is installed and operational in the full SLC through the Linac, Damping Rings, Positron Source, Arcs and Final Focus. The system now includes a host VAX 11/785, a development VAX 11/780, 4 VAX workstations, a distributed network of 70 microprocessors, and about 270 Camac crates with more than 4000 modules. The micros are used for control and monitoring of the hardware, for pulse-to-pulse feedback, and for consoles (COWs). High level model-driven host software provides a variety of tools for beam setup, optimization, diagnosis, and stabilization. This paper will summarize the current status and projects under development.

Phinney, N.; Shoaee, H.

1987-03-01T23:59:59.000Z

431

Status of the Milagro $\\gamma$ Ray Observatory  

E-Print Network [OSTI]

The Milagro Gamma Ray Observatory is the world's first large-area water Cherenkov detector capable of continuously monitoring the sky at TeV energies. Located in northern New Mexico, Milagro will perform an all sky survey of the Northern Hemisphere at energies between ~250 GeV and 50 TeV. With a high duty cycle, large detector area (~5000 square meters), and a wide field-of-view (~1 sr), Milagro is uniquely capable of searching for transient and DC sources of high-energy gamma-ray emission. Milagro has been operating since February, 1999. The current status of the Milagro Observatory and initial results will be discussed.

Atkins, R; Berley, D; Chen, M L; Coyne, D G; Delay, R S; Dingus, B L; Dorfan, D E; Ellsworth, R W; Evans, D; Falcone, A D; Fleysher, L; Fleysher, R; Gisler, G; Goodman, J A; Haines, T J; Hoffman, C M; Hugenberger, S; Kelley, L A; Leonor, I; Macri, J R; McConnell, M; McCullough, J F; McEnery, J E; Miller, R S; Mincer, A I; Morales, M F; N閙ethy, P; Ryan, J M; Schneider, M; Shen, B; Shoup, A L; Sinnis, G; Smith, A J; Sullivan, G W; Thompson, T N; T黰er, T O; Wang, K; Wascko, M O; Westerhoff, S; Williams, D A; Yang, T; Yodh, G B

2001-01-01T23:59:59.000Z

432

Status of LMFBR development project in Japan  

SciTech Connect (OSTI)

Initiation of the LMFBR development project in Japan was decided by the Atomic Energy Commission of Japan in 1966. In 1967, the Power Reactor and Nuclear Fuel Development Corporation (PNC) was established to realize the project as a part of its tasks of a wide scope covering all the research and development activities concerning fuel cycle. In the present paper the status of experimental fast reactor (Joyo), which is the first milestone of the LMFBR project, prototype fast reactor (Monju) and R and D activities supporting the project including that for larger LMFBRs in the future is described.

Nagane, G.; Akebi, M.

1988-01-01T23:59:59.000Z

433

Current status of the RERTR Program  

SciTech Connect (OSTI)

The main purpose of this paper is to review the progress which has been accomplished by the RERTR Program during the past year, the present status of the program, the activities which are now in progress, and the program plans for the coming years. The changes that have taken place in the overall program plan are, in themselves, not very significant. Some activities were found to be somewhat more difficult than expected and required a longer time to complete; others were found to be less difficult than expected and caused opposite readjustments of the program plan. These effects tend to balance each other when the program is considered as a whole.

Travelli, A.

1980-01-01T23:59:59.000Z

434

Status of the minimal supersymmetric SO(10)  

SciTech Connect (OSTI)

We discuss status of the minimal supersymmetric SO(10) in both low and split supersymmetry regime. To demonstrate viability of the model we present a good fit of the fermion masses and their mixings. The solution needs a strongly split supersymmetry with gauginos and higgsinos around 10{sup 2} TeV, sfermions close to 10{sup 14} GeV and a GUT scale of around 6x10{sup 15} GeV. It predicts fast proton decay rates, hierarchical neutrino masses and large leptonic mixing angle sin{theta}{sub 13}{approx_equal}0.1.

Dorsner, Ilja [Jozef Stefan Institute, Jamova cesta 39, 1000 Ljubljana, Slovenia and Faculty of Natural Sciences, Zmaja od Bosne 33-35, 71000 Sarajevo (Bosnia and Herzegowina)

2010-02-10T23:59:59.000Z

435

Status of the Milagro Gamma Ray Observatory  

E-Print Network [OSTI]

The Milagro Gamma Ray Observatory is the world's first large-area water Cherenkov detector capable of continuously monitoring the sky at TeV energies. Located in northern New Mexico, Milagro will perform an all sky survey of the Northern Hemisphere at energies between ~250 GeV and 50 TeV. With a high duty cycle, large detector area (~5000 square meters), and a wide field-of-view (~1 sr), Milagro is uniquely capable of searching for transient and DC sources of high-energy gamma-ray emission. Milagro has been operating since February, 1999. The current status of the Milagro Observatory and initial results will be discussed.

R. Atkins; W. Benbow; D. Berley; M. -L. Chen; D. G. Coyne; R. S. Delay; B. L. Dingus; D. E. Dorfan; R. W. Ellsworth; D. Evans; A. Falcone; L. Fleysher; R. Fleysher; G. Gisler; J. A. Goodman; T. J. Haines; C. M. Hoffman; S. Hugenberger; L. A. Kelley; I. Leonor; J. Macri; M. McConnell; J. F. McCullough; J. E. McEnery; R. S. Miller; A. I. Mincer; M. F. Morales; P. Nemethy; J. M. Ryan; M. Schneider; B. Shen; A. Shoup; G. Sinnis; A. J. Smith; G. W. Sullivan; T. N. Thompson; O. T. Tumer; K. Wang; M. O. Wascko; S. Westerhoff; D. A. Williams; T. Yang; G. B. Yodh

1999-06-24T23:59:59.000Z

436

Current Status of Concentrator Photovoltaic (CPV) Technology  

SciTech Connect (OSTI)

This report describes the current status of the market and technology for concentrator photovoltaic (CPV) cells and modules. Significant progress in CPV has been achieved, including record efficiencies for modules (36.7%) and cells (46%), as well as growth of large field installations in recent years. CPV technology may also have the potential to be cost-competitive on a levelized cost of energy (LCOE) basis in regions of high direct normal irradiance (DNI). The study includes an overview of all installations larger than 1 MW, information on companies currently active in the CPV field, efficiency data, and estimates of the LCOE in different scenarios.

Philipps, S. P.; Bett, A. W.; Horowitz, K.; Kurtz, S.

2015-01-01T23:59:59.000Z

437

Status of the National Security Workforce  

SciTech Connect (OSTI)

This report documents the status of the national security workforce as part of the National Security Preparedness Project, being performed by the Arrowhead Center of New Mexico State University under a DOE/NNSA grant. This report includes an assessment of the current workforce situation. The national security workforce is an important component of national security for our country. With the increase of global threats of terrorism, this workforce is being called upon more frequently. This has resulted in the need for an increasing number of national security personnel. It is imperative to attract and retain a skilled and competitive national security workforce.

None

2008-03-31T23:59:59.000Z

438

Property:CSC-Status | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformationInyo County,InformationInformation PelletsParticipant Jump to:Status Jump to:

439

DFC Technology Status | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebratePartners withof EnergyTechnology Status DFC Technology

440

WIPP Status Update | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation | Department of EnergyDepartment ofResponsible2013)Energy SecurityStatus

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Status of Laboratory Goals | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBiSiteNeutron Scattering4 ByWatchingState ofDr. Donald6fromStatus of

442

Fuel cell generator energy dissipator  

DOE Patents [OSTI]

An apparatus and method are disclosed for eliminating the chemical energy of fuel remaining in a fuel cell generator when the electrical power output of the fuel cell generator is terminated. During a generator shut down condition, electrically resistive elements are automatically connected across the fuel cell generator terminals in order to draw current, thereby depleting the fuel

Veyo, Stephen Emery (Murrysville, PA); Dederer, Jeffrey Todd (Valencia, PA); Gordon, John Thomas (Ambridge, PA); Shockling, Larry Anthony (Pittsburgh, PA)

2000-01-01T23:59:59.000Z

443

Milliwatt Generator Project  

SciTech Connect (OSTI)

This report covers progress on the Milliwatt Generator Project from April 1986 through March 1988. Activities included fuel processing and characterization, production of heat sources, fabrication of pressure-burst test units, compatibility studies, impact testing, and examination of surveillance units. The major task of the Los Alamos Milliwatt Generator Project is to fabricate MC2893A heat sources (4.0 W) for MC2730A radioisotope thermoelectric generators (RTGS) and MC3599 heat sources (4.5 W) for MC3500 RTGs. The MWG Project interfaces with the following contractors: Sandia National Laboratories, Albuquerque (designer); E.I. du Pont de Nemours and Co. (Inc.), Savannah River Plant (fuel); Monsanto Research Corporation, Mound Facility (metal hardware); and General Electric Company, Neutron Devices Department (RTGs). In addition to MWG fabrication activities, Los Alamos is involved in (1) fabrication of pressure-burst test units, (2) compatibility testing and evaluation, (3) examination of surveillance units, and (4) impact testing and subsequent examination of compatibility and surveillance units.

Latimer, T.W.; Rinehart, G.H.

1992-05-01T23:59:59.000Z

444

Modular Isotopic Thermoelectric Generator  

SciTech Connect (OSTI)

Advanced RTG concepts utilizing improved thermoelectric materials and converter concepts are under study at Fairchild for DOE. The design described here is based on DOE's newly developed radioisotope heat source, and on an improved silicon-germanium material and a multicouple converter module under development at Syncal. Fairchild's assignment was to combine the above into an attractive power system for use in space, and to assess the specific power and other attributes of that design. The resultant design is highly modular, consisting of standard RTG slices, each producing ~24 watts at the desired output voltage of 28 volt. Thus, the design could be adapted to various space missions over a wide range of power levels, with little or no redesign. Each RTG slice consists of a 250-watt heat source module, eight multicouple thermoelectric modules, and standard sections of insulator, housing, radiator fins, and electrical circuit. The design makes it possible to check each thermoelectric module for electrical performance, thermal contact, leaktightness, and performance stability, after the generator is fully assembled; and to replace any deficient modules without disassembling the generator or perturbing the others. The RTG end sections provide the spring-loaded supports required to hold the free-standing heat source stack together during launch vibration. Details analysis indicates that the design offers a substantial improvement in specific power over the present generator of RTGs, using the same heat source modules. There are three copies in the file.

Schock, Alfred

1981-04-03T23:59:59.000Z

445

Optical harmonic generator  

DOE Patents [OSTI]

A pair of uniaxial birefringent crystal elements are fixed together to form a serially arranged, integral assembly which, alternatively, provides either a linearly or elliptically polarized second-harmonic output wave or a linearly polarized third-harmonic output wave. The "extraordinary" or "e" directions of the crystal elements are oriented in the integral assembly to be in quadrature (90.degree.). For a second-harmonic generation in the Type-II-Type-II angle tuned case, the input fundamental wave has equal amplitude "o" and "e" components. For a third-harmonic generation, the input fundamental wave has "o" and "e" components whose amplitudes are in a ratio of 2:1 ("o":"e" reference first crystal). In the typical case of a linearly polarized input fundamental wave this can be accomplished by simply rotating the crystal assembly about the input beam direction by 10.degree.. For both second and third harmonic generation input precise phase-matching is achieved by tilting the crystal assembly about its two sensitive axes ("o").

Summers, Mark A. (Livermore, CA); Eimerl, David (Pleasanton, CA); Boyd, Robert D. (Livermore, CA)

1985-01-01T23:59:59.000Z

446

Optical harmonic generator  

DOE Patents [OSTI]

A pair of uniaxial birefringent crystal elements are fixed together to form a serially arranged, integral assembly which, alternatively, provides either a linearly or elliptically polarized second-harmonic output wave or a linearly polarized third-harmonic output wave. The extraordinary or e directions of the crystal elements are oriented in the integral assembly to be in quadrature (90/sup 0/). For a second-harmonic generation in the Type-II-Type-II angle tuned case, the input fundamental wave has equal amplitude o and e components. For a third-harmonic generation, the input fundamental wave has o and e components whose amplitudes are in a ratio of 2:1 (o:e reference first crystal). In the typical case of a linearly polarized input fundamental wave this can be accomplished by simply rotating the crystal assembly about the input beam direction by 10/sup 0/. For both second and third harmonic generation input precise phase-matching is achieved by tilting the crystal assembly about its two sensitive axeses (o).

Summers, M.A.; Eimerl, D.; Boyd, R.D.

1982-06-10T23:59:59.000Z

447

Ignition distributor voltage generator  

SciTech Connect (OSTI)

This patent describes a voltage pulse generator and ignition distributor comprising, a base, a shaft rotatably supported by the base, a distributor cap supported by the base having a center electrode and circumferentially spaced outer electrodes. The pulse generator and ignition distribution also include a first rotor driven by the shaft formed of electrical insulating material having electrically conductive means connected to the center terminal and a portion that rotates past the outer electrodes. The portion of the electrically conductive means that rotates past the outer electrodes is spaced from the outer electrodes to form a gap therebetween. A voltage pulse generator comprises a second rotor driven by the shaft, at least one permanent magnet and an annular pickup coil supported by the base. The pickup coil has inner turns and outer turns, the beginning turn of the inner turns connected to a first lead and the last turn of the outer turns connected to a second lead, the outer turns enclosing the inner turns. The pickup coil also has a circuit connected directly between the second lead and ground which is operative to provide a direct conductive path to ground for high frequency energy capacitively coupled to the outer turns from the gap discharge between the electrically conductive means of the first rotor and an outer electrode, the outer turns forming a grounded shield for the inner turns.

Boyer, J.A.

1986-11-04T23:59:59.000Z

448

Steam generator operating experience, update for 1987--1988  

SciTech Connect (OSTI)

This report summarizes operational events and degradation mechanisms affecting pressurized water reactor steam generator integrity, provides results of 1987 and 1988 steam generator inspections, and highlights both prevalent problem areas and improvements that have been made in nondestructive testing methods, preventive measures, repair techniques, and replacement procedures. It describes the equipment of the three major suppliers and discusses recent examinations of 76 plants. Major areas of concern are the steam generator degradation mechanisms that affect tube integrity or cause tube leakage and tube failure. These include intergranular attack (IGA), intergranular stress corrosion cracking (IGSCC), primary water stress corrosion cracking (PWSCC), pitting, and vibrational wear and fatigue. Also discussed are plugging, sleeving, heat treatment, peening, chemical cleaning, and steam generator replacements, the current status of regulatory instruments and inspection guidelines for ensuring the steam generator integrity, and highlights of steam generator research and unresolved safety issues. The report concludes that cracking, both IGSCC on the tube outside diameter and PWSCC on the tube inside diameter, was the major cause of tube degradation during the 1987--1988 period. 24 refs., 8 tabs.

Frank, L.; Stokley, J.

1989-06-01T23:59:59.000Z

449

Decision-Support Software for Grid Operators: Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation  

SciTech Connect (OSTI)

GENI Project: The CRA team is developing control technology to help grid operators more actively manage power flows and integrate renewables by optimally turning on and off entire power lines in coordination with traditional control of generation and load resources. The control technology being developed would provide grid operators with tools to help manage transmission congestion by identifying the facilities whose on/off status must change to lower generation costs, increase utilization of renewable resources and improve system reliability. The technology is based on fast optimization algorithms for the near to real-time change in the on/off status of transmission facilities and their software implementation.

None

2012-03-16T23:59:59.000Z

450

Journal of NUCLEAR SCIENCE and TECHNOLOGY, 21[1] pp.1~9 (January 1984). 1 Present Status of Study on Extraction  

E-Print Network [OSTI]

of the development of nuclear power generation has not been changed because of maldistribution of the fossil energy resources, their ultimate shortage and the harmful effect of their burnings upon the environment. AccordingJournal of NUCLEAR SCIENCE and TECHNOLOGY, 21[1] pp.1~9 (January 1984). 1 REVIEW Present Status

Laughlin, Robert B.

451

Status of Beta Beam R&D: Radioactive ion production  

E-Print Network [OSTI]

Status of Beta Beam R&D: Radioactive ion production O b h lf f EURISOL DS*/ISOLDE CERN Etam NOAH Infrastructure Action Structuring the European Research Area" g , y , Status of BetaBeam R&D AHIPA09 etam Status of BetaBeam R&D AHIPA09 etam.noah@esss.se #12;Introduction to betabeams Beta-beam proposal

McDonald, Kirk

452

Status of strategic petroleum reserve activities  

SciTech Connect (OSTI)

This is the sixth in a series of status reports requested by members of the Senate Committee on Energy and Natural Resources and the House Committee on Energy and Commerce on the administration's activities to implement title VIII of the Energy Security Act. (See enc. II for the July 23, 1980, letter requesting these reviews.) Title VIII requires the President to resume filling the Strategic Petroleum Reserve (SPR) at an average rate of at least 100,000 barrels per day for fiscal year 1981 and succeeding years. Our most recent report on the status of SPR fill activities (EMD-81-85, May 4, 1981) noted that, since passage of the Energy Security Act, the Government had issued contracts for about 75 million barrels of oil to be delivered to the SPR during fiscal year 1981. This is equivalent to an average fill rate of about 205,000 barrels per day for the entire fiscal year. However, on April 24, 1981, the Department of Energy (DOE) postponed purchases of additional oil for the SPR for about 30 days because it hoped to take advantage of expected decreases in crude oil prices during the period.

Not Available

1981-06-19T23:59:59.000Z

453

Green Power Marketing in the United States: A Status Report ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Codes, Standards & Utility Policies Subprogram Soft Costs Author National Renewable Energy Laboratory Green Power Marketing in the United States: A Status Report (11th...

454

Status and Prospects of the Global Automotive Fuel Cell Industry...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

ORNLTM-2013222 Status and Prospects of the Global Automotive Fuel Cell Industry and Plans for Deployment of Fuel Cell Vehicles and Hydrogen Refueling Infrastructure Revised July...

455

Updated Appendices to the Status of Environmental Management...  

Office of Environmental Management (EM)

Updated Appendices to the Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War...

456

Joint Maintenance Status Report of Potomac Electric Power Company...  

Broader source: Energy.gov (indexed) [DOE]

pursuant to the December 20. 2006, Department of Energy ("DOE") Order No. 202-05-3. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection,...

457

Strategic Analysis of the Global Status of Carbon Capture and...  

Open Energy Info (EERE)

Summary LAUNCH TOOL Name: Strategic Analysis of the Global Status of Carbon Capture and Storage (CCS): Country Studies, United Arab Emirates Focus Area: Clean Fossil Energy...

458

Green Power Marketing in the United States: A Status Report ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6581 September 2009 Green Power Marketing in the United States: A Status Report (2008 Data) Lori Bird, Claire Kreycik, and Barry Friedman National Renewable Energy Laboratory 1617...

459

Geophysics, Geology and Geothermal Leasing Status of the Lightning...  

Open Energy Info (EERE)

Leasing Status of the Lightning Dock KGRA, Animas Valley, New Mexico Author C. Smith Published New Mexico Geological Society Guidebook, 1978 DOI Not Provided Check for DOI...

460

Presentation to the EAC - Smart Grid Subcommittee Work Plan Status...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Advisory Committee Smart Grid Subcommittee Work Plan Status Joe Paladino - DOE Wanda Reder - EAC Smart Grid Sub- Committee Chair June 12, 2012 * Considerations: - Build...

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Vietnam-Status and Potential for the Development of Biofuels...  

Open Energy Info (EERE)

Vietnam-Status and Potential for the Development of Biofuels and Rural Renewable Energy AgencyCompany Organization: Asian Development Bank Sector: Energy Focus Area: Renewable...

462

Implementing a Comprehensive Energy Strategy: A Status Report...  

Broader source: Energy.gov (indexed) [DOE]

A Status Report More Documents & Publications 814 DOE booklet copy Fact Sheet: Clean Coal Technology Ushers In New Era in Energy Fact Sheet: Clean Coal Technology Ushers In...

463

NORTHERN KENTUCKY UNIVERSITY" 2013 EM PLOYM ENT STATUS  

E-Print Network [OSTI]

NORTHERN KENTUCKY UNIVERSITY" 2013 EM PLOYM ENT STATUS FULL TIME FULL TIM EPART TIMEPART TIME NUM KentuckyQ2Indiana:.

Boyce, Richard L.

464

Perceived Vaccination Status in Ecotourists and Risks of Anthropozoonoses  

E-Print Network [OSTI]

status, particularly as the ecotourism industry continues its rapid expansion, and is seen increasingly can produce devastating health and economic outcomes. Ideally, ecotourism functions to facilitate

Muehlenbein, Michael

465

Panel 1, Hawaii Hydrogen Projects Status & Lessons Learned  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Status & Lessons Learned Mitch Ewan Hydrogen Systems Program Manager Hawaii Natural Energy Institute School of Ocean Earth Science and Technology University of Hawaii at...

466

Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1  

SciTech Connect (OSTI)

The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ``stabilized`` form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision.

Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

1995-10-20T23:59:59.000Z

467

Linguistic Alignment in Natural Language Generation  

E-Print Network [OSTI]

that are instantiated at generation time. . . . . . . . .that are instantiated at generation time. . Illustration ofin Natural Language Generation by Gabrielle Halberg

Halberg, Gabrielle Manya

2013-01-01T23:59:59.000Z

468

Development of an Eight Channel Waveform Generator for Beam-forming Applications  

E-Print Network [OSTI]

Setting - Middle ........ 92 7.7.8 0x37 ? Internal PRF Generator Setting - Lower......... 93 7.7.9 0x38 ? Internal EPRI Generator Setting - Upper........ 93 7.7.10 0x39 ? Internal EPRI Generator Setting - Lower........ 93 7.7.11 0x3A ? IO Update Time... debug and expansion ports. There is a local oscillator for house-keeping functions, and status LEDs. Page 24 FPGA PRF Trigger EPRI Reset Sample Clock 100 MHz Local Oscillator Voltage Regulation and Monitoring Serial Port RS-232 Daughterboard...

Ledford, John Paul

2008-01-01T23:59:59.000Z

469

Highly stable aerosol generator  

DOE Patents [OSTI]

An improved compressed air nebulizer has been developed such that a uniform aerosol particle size and concentration may be produced over long time periods. This result is achieved by applying a vacuum pressure to the makeup assembly and by use of a vent tube between the atmosphere and the makeup solution. By applying appropriate vacuum pressures to the makeup solution container and by proper positioning of the vent tube, a constant level of aspirating solution may be maintained within the aspirating assembly with aspirating solution continuously replaced from the makeup solution supply. This device may also be adapted to have a plurality of aerosol generators and only one central makeup assembly. 2 figs.

DeFord, H.S.; Clark, M.L.

1981-11-03T23:59:59.000Z

470

Hermetic turbine generator  

DOE Patents [OSTI]

A Rankine cycle turbine drives an electric generator and a feed pump, all on a single shaft, and all enclosed within a hermetically sealed case. The shaft is vertically oriented with the turbine exhaust directed downward and the shaft is supported on hydrodynamic fluid film bearings using the process fluid as lubricant and coolant. The selection of process fluid, type of turbine, operating speed, system power rating, and cycle state points are uniquely coordinated to achieve high turbine efficiency at the temperature levels imposed by the recovery of waste heat from the more prevalent industrial processes.

Meacher, John S. (Ballston Lake, NY); Ruscitto, David E. (Ballston Spa, NY)

1982-01-01T23:59:59.000Z

471

Computer generated holographic microtags  

DOE Patents [OSTI]

A microlithographic tag comprising an array of individual computer generated holographic patches having feature sizes between 250 and 75 nanometers is disclosed. The tag is a composite hologram made up of the individual holographic patches and contains identifying information when read out with a laser of the proper wavelength and at the proper angles of probing and reading. The patches are fabricated in a steep angle Littrow readout geometry to maximize returns in the -1 diffracted order. The tags are useful as anti-counterfeiting markers because of the extreme difficulty in reproducing them. 5 figs.

Sweatt, W.C.

1998-03-17T23:59:59.000Z

472

Generation | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecember U.S.FinancialofFuelDepartment ofGeneralGeneration

473

Next Generation Materials:  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced Scorecard Federal2EnergyDepartment ofNews News RecentNext Generation

474

Effects of Temporal Wind Patterns on the Value of Wind-GeneratedElectricity at Different Sites in California and the Northwest  

SciTech Connect (OSTI)

Wind power production varies on a diurnal and seasonal basis. In this paper, we use wind speed data from three different sources to assess the effects of wind timing on the value of electric power from potential wind farm locations in California and the Northwestern United States. By ''value'', we refer to either the contribution of wind power to meeting the electric system's peak loads, or the financial value of wind power in electricity markets. Sites for wind power projects are often screened or compared based on the annual average power production that would be expected from wind turbines at each site (Baban and Parry 2001; Brower et al. 2004; Jangamshetti and Rau 2001; Nielsen et al. 2002; Roy 2002; Schwartz 1999). However, at many locations, variations in wind speeds during the day and year are correlated with variations in the electric power system's load and wholesale market prices (Burton et al. 2001; Carlin 1983; Kennedy and Rogers 2003; Man Bae and Devine 1978; Sezgen et al. 1998); this correlation may raise or lower the value of wind power generated at each location. A number of previous reports address this issue somewhat indirectly by studying the contribution of individual wind power sites to the reliability or economic operation of the electric grid, using hourly wind speed data (Fleten et al.; Kahn 1991; Kirby et al. 2003; Milligan 2002; van Wijk et al. 1992). However, we have not identified any previous study that examines the effect of variations in wind timing across a broad geographical area on wholesale market value or capacity contribution of those different wind power sites. We have done so, to determine whether it is important to consider wind-timing when planning wind power development, and to try to identify locations where timing would have a more positive or negative effect. The research reported in this paper seeks to answer three specific questions: (1) How large of an effect can the temporal variation of wind power have on the value of wind in different wind resource areas? (2) Which locations are affected most positively or negatively by the seasonal and diurnal timing of wind speeds? (3) How compatible are wind resources in California and the Northwest (Washington, Oregon, Idaho, Montana and Wyoming) with wholesale power prices and loads in either region? The latter question is motivated by the fact that wind power projects in the Northwest could sell their output into California (and vice versa), and that California has an aggressive renewable energy policy that may ultimately yield such imports. We also assess whether modeled wind data from TrueWind Solutions, LLC, can help answer such questions, by comparing results found using the TrueWind data to those found using anemometers or wind farm power production data. This paper summarizes results that are presented in more detail in a recent report from Lawrence Berkeley National Laboratory (Fripp and Wiser 2006). The full report is available at http://eetd.lbl.gov/EA/EMP/re-pubs.html.

Fripp, Matthias; Wiser, Ryan

2006-08-04T23:59:59.000Z

475

Energy Generation by State and Technology (2009) - Energy Generation...  

Open Energy Info (EERE)

Energy Generation by Fuel ... Download Energy Generation by Fuel Source and State, 2009 URL: http:en.openei.orgdatasetsdataset03f65dc9-ddc9-41ce-806f-edafad486a1fresource...

476

Annual Hanford Site environmental permitting status report  

SciTech Connect (OSTI)

The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

Sonnichsen, J.C.

1998-09-17T23:59:59.000Z

477

Status of ECRH project on EAST Tokamak  

SciTech Connect (OSTI)

A 140GHz electron cyclotron resonance heating and current drive (EC H and CD) project for EAST Tokamak is launched in 2011 with a total power of 4MW and pulse length of 100 s. The main objectives of the system are to provide central H and CD, assist start-up and control of MHD activities. The system comprises four gyrotrons each with nominal output power of 1MW at 140GHz. The RF power, transmitted through four evacuated corrugated waveguides will be injected into plasma from the low field side (radial port). The front steering equatorial launcher directs the RF beam over 25 toroidally and scans over 38 poloidally. At present, the construction of the first 1MW system is undergoing for the expected campaign in the end of 2013. In this paper, the current status of the development and the design of the 140-GHz ECRH system are presented.

Wang, Xiaojie; Liu, Fukun; Shan, Jiafang; Xu, Handong; Wu, Dajun; Li, Bo; Zhang, Jiang; Huang, Yiyun; Tang, Yunying; Xu, Weiye; Hu, Huaichuan; Wang, Jian; Xu, Li [Institute of Plasma Physics Chinese Academy of Sciences, Hefei (China); Wei, Wei [Institute of Plasma Physics Chinese Academy of Sciences, Hefei, China and HeFei University of Technology, Hefei (China)

2014-02-12T23:59:59.000Z

478

Current status of the GLASS code  

SciTech Connect (OSTI)

This paper summarizes the current status of the Generalized Lattice Analysis SubSystem (GLASS) computer code and its supporting cross section libraries. GLASS was developed at the Savannah River Site (SRS) in the early 1970's. The GLASS code has been instrumental in supporting safe Heavy Water Reactor (HWR) operations and predicting material production at SRS for more than 20 years. The Department of Energy Office of New Production Reactors (ONPR) program has chosen to use the GLASS code for the design of the HWR option of the New Production Reactor (NPR). A substantial body of validation calculations have been performed and additional validation calculations will be performed to qualify the new GLASS multigroup cross section libraries derived from the ENDF/B-5 and 6 nuclear data files. Several improvements to the code are in progress. Many other improvements are planned to bring GLASS up to modern physics and compute technology.

Hootman, H.E. (Westinghouse Savannah River Co., Aiken, SC (United States)); Honeck, H.C. (Computer Application Technology, Inc., Aiken, SC (United States))

1991-01-01T23:59:59.000Z

479

Current status of the GLASS code  

SciTech Connect (OSTI)

This paper summarizes the current status of the Generalized Lattice Analysis SubSystem (GLASS) computer code and its supporting cross section libraries. GLASS was developed at the Savannah River Site (SRS) in the early 1970`s. The GLASS code has been instrumental in supporting safe Heavy Water Reactor (HWR) operations and predicting material production at SRS for more than 20 years. The Department of Energy Office of New Production Reactors (ONPR) program has chosen to use the GLASS code for the design of the HWR option of the New Production Reactor (NPR). A substantial body of validation calculations have been performed and additional validation calculations will be performed to qualify the new GLASS multigroup cross section libraries derived from the ENDF/B-5 and 6 nuclear data files. Several improvements to the code are in progress. Many other improvements are planned to bring GLASS up to modern physics and compute technology.

Hootman, H.E. [Westinghouse Savannah River Co., Aiken, SC (United States); Honeck, H.C. [Computer Application Technology, Inc., Aiken, SC (United States)

1991-12-31T23:59:59.000Z

480

HARDWARE AND SOFTWARE STATUS OF QCDOC.  

SciTech Connect (OSTI)

QCDOC is a massively parallel supercomputer whose processing nodes are based on an application-specific integrated circuit (ASIC). This ASIC was custom-designed so that crucial lattice QCD kernels achieve an overall sustained performance of 50% on machines with several 10,000 nodes. This strong scalability, together with low power consumption and a price/performance ratio of $1 per sustained MFlops, enable QCDOC to attack the most demanding lattice QCD problems. The first ASICs became available in June of 2003, and the testing performed so far has shown all systems functioning according to specification. We review the hardware and software status of QCDOC and present performance figures obtained in real hardware as well as in simulation.

BOYLE,P.A.; CHEN,D.; CHRIST,N.H.; PETROV.K.; ET AL.

2003-07-15T23:59:59.000Z

Note: This page contains sample records for the topic "wholesale generator status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

US nuclear engineering education: Status and prospects  

SciTech Connect (OSTI)

This study, conducted under the auspices of the Energy Engineering Board of the National Research Council, examines the status of and outlook for nuclear engineering education in the United States. The study resulted from a widely felt concern about the downward trends in student enrollments in nuclear engineering, in both graduate and undergraduate programs. Concerns have also been expressed about the declining number of US university nuclear engineering departments and programs, the aging of their faculties, the appropriateness of their curricula and research funding for industry and government needs, the availability of scholarships and research funding, and the increasing ratio of foreign to US graduate students. A fundamental issue is whether the supply of nuclear engineering graduates will be adequate for the future. Although such issues are more general, pertaining to all areas of US science and engineering education, they are especially acute for nuclear engineering education. 30 refs., 12 figs., 20 tabs.

Not Available

1990-01-01T23:59:59.000Z

482

The GRANIT project: Status and Perspectives  

E-Print Network [OSTI]

The GRANIT project is the follow-up of the pioneering experiments that first observed the quantum states of neutrons trapped in the earth's gravitational field at the Institute Laue Langevin (ILL). Due to the weakness of the gravitational force, these quantum states exhibit most unusual properties: peV energies and spatial extensions of order 10 $\\mu$m. Whereas the first series of observations aimed at measuring the properties of the wave functions, the GRANIT experiment will induce resonant transitions between states thus accessing to spectroscopic measurements. After a brief reminder of achieved results, the principle and the status of the experiment, presently under commissioning at the ILL, will be given. In the second part, we will discuss the potential of GRANIT to search for new physics, in particular to a modified Newton law in the micrometer range.

Stephan Bae ler; Alexei Gagarski; Ludmilla Grigorieva; Michael Kreuz; Fabrice Naraghi; Valery Nesvizhevsky; Guillaume Pignol; Konstantin Protassov; Dominique Rebreyend; Francis Vezzu; Alexei Voronin

2012-02-14T23:59:59.000Z

483

The GRANIT project: Status and Perspectives  

E-Print Network [OSTI]

The GRANIT project is the follow-up of the pioneering experiments that first observed the quantum states of neutrons trapped in the earth's gravitational field at the Institute Laue Langevin (ILL). Due to the weakness of the gravitational force, these quantum states exhibit most unusual properties: peV energies and spatial extensions of order 10 $\\mu$m. Whereas the first series of observations aimed at measuring the properties of the wave functions, the GRANIT experiment will induce resonant transitions between states thus accessing to spectroscopic measurements. After a brief reminder of achieved results, the principle and the status of the experiment, presently under commissioning at the ILL, will be given. In the second part, we will discuss the potential of GRANIT to search for new physics, in particular to a modified Newton law in the micrometer range.

ler, Stephan Bae; Grigorieva, Ludmilla; Kreuz, Michael; Naraghi, Fabrice; Nesvizhevsky, Valery; Pignol, Guillaume; Protassov, Konstantin; Rebreyend, Dominique; Vezzu, Francis; Voronin, Alexei

2012-01-01T23:59:59.000Z

484

Annual Hanford Site Environmental Permitting status report  

SciTech Connect (OSTI)

The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

SONNICHSEN, J.C.

1999-10-18T23:59:59.000Z

485

Industrial demand side management: A status report  

SciTech Connect (OSTI)

This report provides an overview of and rationale for industrial demand side management (DSM) programs. Benefits and barriers are described, and data from the Manufacturing Energy Consumption Survey are used to estimate potential energy savings in kilowatt hours. The report presents types and examples of programs and explores elements of successful programs. Two in-depth case studies (from Boise Cascade and Eli Lilly and Company) illustrate two types of effective DSM programs. Interviews with staff from state public utility commissions indicate the current thinking about the status and future of industrial DSM programs. A comprehensive bibliography is included, technical assistance programs are listed and described, and a methodology for evaluating potential or actual savings from projects is delineated.

Hopkins, M.F.; Conger, R.L.; Foley, T.J. [and others

1995-05-01T23:59:59.000Z

486

NGNP Program 2013 Status and Path Forward  

SciTech Connect (OSTI)

High temperature gas-cooled reactor (HTGR) technology can play an important role in the energy future of the United States by extending the use of nuclear energy for non-electricity energy production missions, as well as continuing to provide a considerable base load electric power generation capability. Extending nuclear energy into the industrial and transportation sectors through the coproduction of process heat and electricity provides safe, reliable energy for these sectors in an environmentally responsible manner. The modular HTGR provides a substantial improvement in nuclear plant safety for the protection of the public and the environment, and supports collocation of the HTGRhigh temperature gas-cooled reactor with major industrial facilities. Under U.S. Department of Energy direction since 2006, the Next Generation Nuclear Plant Project at Idaho National Laboratory has been working toward commercializing the HTGR technology. However, a recent decision by the Secretary of Energy to reduce the scope of the Next Generation Nuclear Plant Project to a research and development program, considerable realignment has taken place. This report: (1) summarizes the accomplishments of the Next Generation Nuclear Plant Program from FY2011 through FY2013; (2) lays out the path forward necessary to achieve the ultimate objective of commercializing HTGR technology; and (3) discusses ongoing technical, licensing, and evaluation activities under the realigned Next Generation Nuclear Plant program considered important to preserve the significant investment made by the government to-date and to maintain some progress in meeting the objectives of the Energy Policy Act of 2005 (EPAct2005).

Hans Gougar

2014-03-01T23:59:59.000Z

487

Coal gasification for power generation. 2nd ed.  

SciTech Connect (OSTI)

The report gives an overview of the opportunities for coal gasification in the power generation industry. It provides a concise look at the challenges faced by coal-fired generation, the ability of coal gasification to address these challenges, and the current state of IGCC power generation. Topics covered in the report include: An overview of coal generation including its history, the current market environment, and the status of coal gasification; A description of gasification technology including processes and systems; An analysis of the key business factors that are driving increased interest in coal gasification; An analysis of the barriers that are hindering the implementation of coal gasification projects; A discussion of Integrated Gasification Combined Cycle (IGCC) technology; An evaluation of IGCC versus other generation technologies; A discussion of IGCC project development options; A discussion of the key government initiatives supporting IGCC development; Profiles of the key gasification technology companies participating in the IGCC market; and A description of existing and planned coal IGCC projects.

NONE

2006-10-15T23:59:59.000Z

488

Energy Replacement Generation Tax Exemption  

Broader source: Energy.gov [DOE]

Iowa imposes a replacement generation tax of 0.06 cents ($0.0006) per kilowatt-hour (kWh) on various forms of electricity generated within the state. This tax is imposed in lieu of a property tax...

489

Steam generator tube rupture study  

E-Print Network [OSTI]

This report describes our investigation of steam generator behavior during a postulated tube rupture accident. Our study was performed using the steam generator, thermal-hydraulic analysis code THERMIT-UTSG. The purpose ...

Free, Scott Thomas

1986-01-01T23:59:59.000Z

490

Energy Generation Project Permitting (Vermont)  

Broader source: Energy.gov [DOE]

The Vermont Energy Generation Siting Policy Commission is mandated to survey best practices for siting approval of electric generation projects (all facilities except for net- and group-net-metered...

491

Transition-fault test generation  

E-Print Network [OSTI]

. One way to detect these timing defects is to apply test patterns to the integrated circuit that are generated using the transition-fault model. Unfortunately, industry's current transition-fault test generation schemes produce test sets that are too...

Cobb, Bradley Douglas

2013-02-22T23:59:59.000Z

492

NSTX Liquid Lithium Divertor (LLD) Design Status and Plans  

E-Print Network [OSTI]

NSTX Liquid Lithium Divertor (LLD) Design Status and Plans Office of Science H. W. Kugel, PPPL Design Status and Plans (Kugel) 2July 28, 2008 Motivation for NSTX Lithium Research 路 NSTX research with solid lithium is aimed initially towards using liquid lithium to control density, edge collisionality

Princeton Plasma Physics Laboratory

493

Reading the GL005 Summary Budget Status report  

E-Print Network [OSTI]

Reading the GL005 Summary Budget Status report Cognos FMS111 Reporting Reference Reading the GL005 University Page 1 of 2 The GL005 Summary Budget Status Report displays the budget amounts and remaining Project Budget Statement. This report pairs well with the related GL008 Revenue and Expense Activity

Shull, Kenneth R.

494

Target selection and current status of structural genomics for the  

E-Print Network [OSTI]

33 Target selection and current status of structural genomics for the completed microbial genomes 3.2 Structural status of completed microbial genomes in the PDB................ 3.3 Metabolic pathways as targets for structural genomics.......................... 3.3.1 Glycolytic pathway

Babu, M. Madan

495

AGRICULTURE, 2008 Status of the Wisconsin Farm Economy  

E-Print Network [OSTI]

STATUS OF WISCONSIN AGRICULTURE, 2008 Status of the Wisconsin Farm Economy Situation and Outlook of Working Lands in Wisconsin 路 Hired Labor on Wisconsin Dairy Farms Department of Agricultural and Applied Economics College of Agricultural and Life Sciences University of Wisconsin-Madison Cooperative Extension

Radeloff, Volker C.

496

AGRICULTURE, 2007 Status of the Wisconsin Farm Economy  

E-Print Network [OSTI]

STATUS OF WISCONSIN AGRICULTURE, 2007 Status of the Wisconsin Farm Economy Situation and Outlook and Challenges 路 Current Prospects for the 2007 Farm Bill Department of Agricultural and Applied Economics College of Agricultural and Life Sciences University of Wisconsin-Madison Cooperative Extension University

Radeloff, Volker C.

497

AGRICULTURE, 2006 Status of the Wisconsin Farm Economy  

E-Print Network [OSTI]

STATUS OF WISCONSIN AGRICULTURE, 2006 Status of the Wisconsin Farm Economy Situation and Outlook-Added Agriculture 路 Organic Farming in Wisconsin 路 A New Wisconsin Cooperative Law Department of Agricultural and Applied Economics College of Agricultural and Life Sciences University of Wisconsin-Madison Cooperative

Radeloff, Volker C.

498

Original article Photosynthesis and shoot water status of seedlings  

E-Print Network [OSTI]

Original article Photosynthesis and shoot water status of seedlings from different oak species Stress effects induced on shoot photosynthesis and leaf water status by root hypoxia due. Predawn leaf water potential remained high in all cases, in- dicating that reductions in photosynthesis

Boyer, Edmond

499

Economic Consequences of Health Status: A Review of the Evidence  

E-Print Network [OSTI]

Economic Consequences of Health Status: A Review of the Evidence Amar A. Hamoudi and Jeffrey D Papers #12;CID Working Paper no. 30 Economic Consequences of Health Status: A Review of the Evidence Amar A. Hamoudi and Jeffrey D. Sachs Abstract The correlation between health and economic performance

500

Status of the Coral Reef Ecosystems of Guam  

E-Print Network [OSTI]

of U.S. and international coral reef ecosystems. The CRCA also required that the National OceanicStatus of the Coral Reef Ecosystems of Guam By Val Porter, Trina Leberer, Mike Gawel, Jay Gutierrez Marine Laboratory Technical Report No. 113 October 2005 #12;Status of the Coral Reef Ecosystems of Guam

Mcilwain, Jenny