National Library of Energy BETA

Sample records for westinghouse three-loop pressurized

  1. Bootstrapping the Three-Loop Hexagon

    SciTech Connect (OSTI)

    Dixon, Lance J.; Drummond, James M.; Henn, Johannes M.; /Humboldt U., Berlin /Santa Barbara, KITP

    2011-11-08

    We consider the hexagonal Wilson loop dual to the six-point MHV amplitude in planar N = 4 super Yang-Mills theory. We apply constraints from the operator product expansion in the near-collinear limit to the symbol of the remainder function at three loops. Using these constraints, and assuming a natural ansatz for the symbol's entries, we determine the symbol up to just two undetermined constants. In the multi-Regge limit, both constants drop out from the symbol, enabling us to make a non-trivial confirmation of the BFKL prediction for the leading-log approximation. This result provides a strong consistency check of both our ansatz for the symbol and the duality between Wilson loops and MHV amplitudes. Furthermore, we predict the form of the full three-loop remainder function in the multi-Regge limit, beyond the leading-log approximation, up to a few constants representing terms not detected by the symbol. Our results confirm an all-loop prediction for the real part of the remainder function in multi-Regge 3 {yields} 3 scattering. In the multi-Regge limit, our result for the remainder function can be expressed entirely in terms of classical polylogarithms. For generic six-point kinematics other functions are required.

  2. Westinghouse Test Stand Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved MT-14-12 Westinghouse VERA Test Stand Zero Power Physics Test Simulations for the AP1000® PWR Fausto Franceschini, Westinghouse Electric Company LLC Andrew Godfrey, Oak Ridge National Laboratory Joel Kulesza, Westinghouse Electric Company LLC Robert Oelrich, Westinghouse Electric Company LLC L3.AMA.VDT.P8.01 Milestone Report CASL-U-2014-0012-000 March 6, 2014 MT-14-12 Westinghouse VERA Test Stand

  3. CASL - Westinghouse Electric Company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse Electric Company Cranberry Township, PA Westinghouse Electric Company provides fuel, services, technology, plant design and equipment for the commercial nuclear electric power industry. Westinghouse nuclear technology is helping to provide future generations with safe, clean and reliable electricity. Key Contributions Definition of CASL challenge problems Existing codes and expertise Data for validation Computatinoal fluid dynamics modeling and analysis Development of test stand for

  4. Westinghouse Completes its AP1000® Test Stand

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completes its AP1000® Test Stand Last June, CASL launched its first Virtual Environment for Reactor Applications (VERA) Test Stand on the Westinghouse engineering computer cluster. Westinghouse selected the AP1000® pressurized water reactor (PWR) first core for the Test Stand simulation because its advanced design and operational features, and imminent deployment in units under construction, make it a particularly relevant and engaging application of CASL technology. The Westinghouse Test

  5. Westinghouse Presentation Template Class 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 R&D Summit "Innovation and Collaboration" Paolo Ferroni Westinghouse Electric Company February 25, 2014 CASL-U-2014-0356-000 CASL-U-2014-0356-000 1 Westinghouse...

  6. Sinc function representation and three-loop master diagrams

    SciTech Connect (OSTI)

    Easther, Richard; Guralnik, Gerald; Hahn, Stephen

    2001-04-15

    We test the Sinc function representation, a novel method for numerically evaluating Feynman diagrams, by using it to evaluate the three-loop master diagrams. Analytical results have been obtained for all these diagrams, and we find excellent agreement between our calculations and the exact values. The Sinc function representation converges rapidly, and it is straightforward to obtain accuracies of 1 part in 10{sup 6} for these diagrams and with longer runs we found results better than 1 part in 10{sup 12}. Finally, this paper extends the Sinc function representation to diagrams containing massless propagators.

  7. Westinghouse Announces Managerial Appointments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Announces Managerial Appointments CARLSBAD, N.M., September 6, 2001 -- Westinghouse TRU Solutions LLC (WTS) has announced three management appointments in its Environment, Safety, and Health Department at the Waste Isolation Pilot Plant (WIPP). WTS is the management and operating contractor for the U.S. Department of Energy at WIPP. Donald J. Harward Donald J. Harward has been named Deputy Manager of the department. He also is project leader for the WIPP Air Monitoring Improvement Team. A native

  8. Overview of Westinghouse`s Advanced Turbine Systems Program

    SciTech Connect (OSTI)

    Bannister, R.L.; Bevc, F.P.; Diakunchak, I.S.; Huber, D.J.

    1995-12-31

    The proposed approach is to build on Westinghouse`s successful 501 series of gas turbines. The 501F offered a combined cycle efficiency of 54%; 501G increased this efficiency to 58%; the proposed single-shaft 400 MW class ATS combined cycle will have a plant cycle efficiency greater than 60%. Westinghous`s strategy is to build upon the next evolution of advances in combustion, aerodynamics, cooling, leakage control, materials, and mechanical design. Westinhouse will base its future gas turbine product line, both 50 and 60 Hz, on ATS technology; the 501G shows early influences of ATS.

  9. Westinghouse Earns Safety Excellence Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Immediate Release Westinghouse Earns Safety Excellence Award CARLSBAD, N.M., December 17, 2001 - For the third time this year, Westinghouse TRU Solutions LLC (WTS) has been recognized for safety excellence by the New Mexico State Mine Inspector. WTS is the management and operating contractor for the U.S. Department of Energy at the Waste Isolation Pilot Plant (WIPP). On December 6, New Mexico Inspector of Mines Gilbert Miera presented WTS with the "Safety Excellence Award" in the

  10. Westinghouse thermal barrier coatings development

    SciTech Connect (OSTI)

    Goedjen, J.G.; Wagner, G.

    1995-10-01

    Westinghouse, in conjunction with the Department of Energy and Oak Ridge National Laboratory, has embarked upon a program for the development of advanced thermal barrier coatings for industrial gas turbines. Development of thermal barrier coatings (TBC`s) for industrial gas turbines has relied heavily on the transfer of technology from the aerospace industry. Significant differences in the time/temperature/stress duty cycles exist between these two coating applications. Coating systems which perform well in aerospace applications may not been optimized to meet power generation performance requirements. This program will focus on development of TBC`s to meet the specific needs of power generation applications. The program is directed at developing a state-of-the-art coating system with a minimum coating life of 25,000 hours at service temperatures required to meet increasing operating efficiency goals. Westinghouse has assembled a team of university and industry leaders to accomplish this goal. Westinghouse will coordinate the efforts of all program participants. Chromalloy Turbine Technologies, Inc. and Sermatech International, Inc. will be responsible for bond coat and TBC deposition technology. Praxair Specialty Powders, Inc. will be responsible for the fabrication of all bond coat and ceramic powders for the program. Southwest Research Institute will head the life prediction modelling effort; they will also be involved in coordinating nondestructive evaluation (NDE) efforts. Process modelling will be provided by the University of Arizona.

  11. On One Master Integral for Three-loop On-shell HQET Propagator Diagrams with Mass

    SciTech Connect (OSTI)

    Grozin, A.G.; Huber, T.; Maitre, D.; /SLAC

    2007-06-26

    An exact expression for the master integral I{sub 2} [1] arising in three-loop on-shell HQET propagator diagrams with mass is derived and its analytical expansion in the dimensional regularization parameter {var_epsilon} is given.

  12. Westinghouse hires new attorney at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hires New Attorney at WIPP Carlsbad, N.M., February 10, 2000 - The Westinghouse Waste Isolation Division today announced that Raeburn Josey has joined the Westinghouse legal staff at the Waste Isolation Pilot Plant (WIPP). Prior to joining Westinghouse, Josey was in private practice in Atlanta. From 1980 to 1985 he was employed by the Institute of Nuclear Power Operations (INPO), a utility- funded organization. Working with the organization almost from its inception, Josey helped INPO in

  13. Westinghouse to host education fair

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to Host Education Fair CARLSBAD, N.M., June 8, 2000 - The Westinghouse Waste Isolation Division (WID) invites the public to participate in an education fair June 14 in Carlsbad. The event is scheduled from 8 a.m. until noon and from 1:30 p.m. until 3 p.m. at the Skeen-Whitlock Building, 4021 National Parks Highway. Representatives from 10 universities will be on hand to discuss degree programs available through distance education. Persons interested in pursuing undergraduate and graduate degrees

  14. Enforcement Letter, Westinghouse Hanford Corporation - September...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications Enforcement Letter, Westinghouse Hanford Corporation - July 6, 1995 Inspection Report: IG-0401 Enforcement Letter, Fluor Daniel Hanford, Inc - July 31, 1998...

  15. DOE Initiates Enforcement Proceedings against Westinghouse and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Proposed Civil Penalty Issued) DOE Initiates Enforcement Proceedings against Westinghouse and Mitsubishi for Failure to Certify (Notice of Proposed Civil Penalty Issued) ...

  16. Enforcement Letter, Westinghouse Waste Isolation Division - October...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company, L.L.C - September 11, 2000 Enforcement Letter, Westinghouse Savannah River Company - July 21, 1998 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000...

  17. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Environmental Management (EM)

    concerning the unnecessary radiation exposure of three Westinghouse Savannah River Company (WSRC) personnel and the subsequent falsification of radiation dose records. ...

  18. Enforcement Letter, Westinghouse Savannah River Company - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company related to repeated criticality safety violations in 2002 and 2003 at the H-Canyon facility at DOE's Savannah River Site. PDF icon Enforcement Letter, Westinghouse...

  19. CERTIFICATION DOCKET WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT

    Office of Legacy Management (LM)

    ... A survey cf the area of the "L' Building was performed and consisted of gamma-ray ... - Statement of Certification Westinghouse Atomic Power Development Plant East Pittsburgh ...

  20. Westinghouse Advanced Reactors Division Plutonium Fuel Laboratories

    Office of Legacy Management (LM)

    Radiological Condition of the Westinghouse Advanced Reactors Division Plutonium Fuel Laboratories Cheswick, Pennsylvania -. -, -- AGENCY: Office of Operational Safety, Department of Energy ACTION: Notice of Availability of Archival Information Package SUMMARY: The Office of Operational Safety of the Department of Energy (DOE) has, reviewed documentation relating to the decontamination and decommissioning operations conducted at the Westinghouse Advanced Reactor Division laboratories (buildings 7

  1. Westinghouse Lighting: Notice of Allowance (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE issued a Notice of Allowance to Westinghouse Lighting Corporation allowing Westinghouse Lighting to resume distribution of various lamp products after Westinghouse Lighting provided new test data performed according to DOE regulations.

  2. Westinghouse Lighting: Notice of Allowance (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE issued a Notice of Allowance to Westinghouse Lighting Corporation allowing Westinghouse Lighting to resume distribution of product code 0521000 after Westinghouse Lighting provided new test data performed according to DOE regulations.

  3. Preliminary Notice of Violation, Westinghouse Savannah River...

    Broader source: Energy.gov (indexed) [DOE]

    River Company - EA-97-11 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-1999-06...

  4. Westinghouse TRU Solutions Launches New Web Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TRU Solutions LLC Launches New Web Site CARLSBAD, N.M., February 2, 2001 - Westinghouse TRU Solutions LLC (WTS) today launched its new Web site. WTS is the new management and ...

  5. Enforcement Letter, Westinghouse Savannah River Company- July 21, 1998

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Notification of Incomplete Corrective Action

  6. Enforcement Letter, Westinghouse Savannah River Company- November 14, 2003

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Criticality Safety Violations at the Savannah River Site

  7. Enforcement Letter, Westinghouse Savannah River Company- April 19, 2004

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Employee Reprisal at the Savannah River Site

  8. Westinghouse TRU Solutions LLC Assumes WIPP Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse TRU Solutions LLC Assumes WIPP Operations CARLSBAD, N.M., February 1, 2001 - Westinghouse TRU Solutions LLC (WTS) today assumed responsibility for the management and operation of the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). Heading up the new management team is Henry F. "Hank" Herrera, President and General Manager of WTS. A retired U.S. Navy Rear Admiral, Herrera has more than 27 years of nuclear operations and radioactive waste management

  9. CERTIFICATION DOCKET WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT

    Office of Legacy Management (LM)

    WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects ..-.. --__- _".-.-l--_--l -_._ _- --- ~~~. . ..~ CONTENTS Page - - I NTRODUCTI ON 1 Purpose 1 Docket Contents 1 Exhibit I: Summary of Activities at Westinghouse Atomic Power Development Plant, East Pittsburgh Plant, Forest Hills, Pittsburgh, Pennsylvania

  10. Westinghouse VANTAGE+ fuel assembly to meet future PWR operating requirements

    SciTech Connect (OSTI)

    Doshi, P.K.; Chapin, D.L.; Scherpereel, L.R.

    1988-01-01

    Many utilities operating pressurized water reactors (PWRs) are implementing longer reload cycles. Westinghouse is addressing this trend with fuel products that increase fuel utilization through higher discharge burnups. Higher burnup helps to offset added enriched uranium costs necessary to enable the higher energy output of longer cycles. Current fuel products have burnup capabilities in the area of 40,000 MWd/tonne U or more. There are three main phenomena that must be addressed to achieve even higher burnup levels: accelerated cladding, waterside corrosion, and hydriding; increased fission gas production; and fuel rod growth. Long cycle lengths also require efficient burnable absorbers to control the excess reactivity associated with increased fuel enrichment while maintaining a low residual absorber penalty at the end of cycle. Westinghouse VANTAGE + PWR fuel incorporates features intended to enhance fuel performance at very high burnups, including advances in the three basic elements of the fuel assembly: fuel cladding, fuel rod, and fuel assembly skeleton. ZIRLO {sup TM} cladding, an advanced Zircaloy cladding that contains niobium, offers a significant improvement in corrosion resistance relative to Zircaloy-4. Another important Westinghouse PWR fuel feature that facilitates long cycles is the zirconium diboride integral fuel burnable absorber (ZrB{sub 2}IFBA).

  11. Westinghouse Small Modular Reactor balance of plant and supporting systems design

    SciTech Connect (OSTI)

    Memmott, M. J.; Stansbury, C.; Taylor, C.

    2012-07-01

    The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor (iPWR), in which all of the components typically associated with the nuclear steam supply system (NSSS) of a nuclear power plant are incorporated within a single reactor pressure vessel. This paper is the second in a series of four papers which describe the design and functionality of the Westinghouse SMR. It focuses, in particular, upon the supporting systems and the balance of plant (BOP) designs of the Westinghouse SMR. Several Westinghouse SMR systems are classified as safety, and are critical to the safe operation of the Westinghouse SMR. These include the protection and monitoring system (PMS), the passive core cooling system (PXS), and the spent fuel cooling system (SFS) including pools, valves, and piping. The Westinghouse SMR safety related systems include the instrumentation and controls (I and C) as well as redundant and physically separated safety trains with batteries, electrical systems, and switch gears. Several other incorporated systems are non-safety related, but provide functions for plant operations including defense-in-depth functions. These include the chemical volume control system (CVS), heating, ventilation and cooling (HVAC) systems, component cooling water system (CCS), normal residual heat removal system (RNS) and service water system (SWS). The integrated performance of the safety-related and non-safety related systems ensures the safe and efficient operation of the Westinghouse SMR through various conditions and transients. The turbine island consists of the turbine, electric generator, feedwater and steam systems, moisture separation systems, and the condensers. The BOP is designed to minimize assembly time, shipping challenges, and on-site testing requirements for all structures, systems, and components. (authors)

  12. Westinghouse Lighting: Order (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE ordered Westinghouse Lighting Corporation to pay a $50,000 civil penalty after finding Westinghouse Lighting had failed to certify that certain models of general service flourescent and incandescent reflector lamps comply with the applicable energy conservation standards.

  13. Best Seller Cites Westinghouse Safety Culture at WIPP as "World...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse TRU Solutions LLC. "We are proud of our safety culture, and we continuously work to enhance it." Westinghouse is the management and operating contractor for the U.S....

  14. Westinghouse sees potential in East Europe

    SciTech Connect (OSTI)

    Lane, E.

    1993-07-09

    Westinghouse Electric Corp. is laying the groundwork for future nuclear fuel sales and construction and repair contracts in Eastern Europe and Ukraine by helping to finish the Russian-designed 1,000 megawatt VVER Temelin nuclear power plant in the former Czechoslovakia. Using the skills learned there, the company hopes to tap into the potentially lucrative market in Ukraine.

  15. Westinghouse Lighting: Noncompliance Determination (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE issued a Notice of Noncompliance Determination to Westinghouse Lighting Corporation finding that model F40T12/CWE (Westinghouse product code 07521000), a general service fluorescent lamp, and model 15GLOBE/65/2 (Westinghouse product code 3800400), a medium base compact fluorescent lamp, do not comport with the energy conservation standards.

  16. Westinghouse TRU Solutions LLC Announces Scholarship Awards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Eddy and Lea counties. In Eddy County, $1,000 scholarships were awarded to high school seniors Ashley Fry, Bethany Fry and Katherine Bergstrom, all of Carlsbad; Aaron Navarrete, Loving; and Trenton Guthrie, Artesia. Scholarship funds were directly managed by school officials to target the needs of students. Funds could be used toward higher math and science education degrees, community college associate degrees, technical and vocational programs, tuition, books, or room and board. Westinghouse

  17. DOE - Office of Legacy Management -- Westinghouse Electric Corp - NJ 03

    Office of Legacy Management (LM)

    Electric Corp - NJ 03 FUSRAP Considered Sites Site: WESTINGHOUSE ELECTRIC CORP. ( NJ.03 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: North American Phillips Lighting Westinghouse Electric Company Lamp Divisions North American Philips Lighting Corporation NJ.03-1 NJ.03-2 NJ.03-3 Location: One Westinghouse Plaza - Building 7 , Bloomfield , New Jersey NJ.03-4 Evaluation Year: 1985 NJ.03-3 Site Operations: From 1941 to 1943, developed a photochemical

  18. DOE, Westinghouse sponsor medical technician course

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sponsor Emergency Medical Technician Course CARLSBAD, N.M., February 24, 2000 - The U.S. Department of Energy (DOE) Carlsbad Area Office and the Westinghouse Waste Isolation Division are sponsoring a six- week Emergency Medical Technician-Basic course, March 1-April 19, at the Skeen-Whitlock Building, 4021 National Parks Highway. Classes are from 8 a.m. to 4 p.m., Mondays, Wednesdays, and every other Friday, as scheduled. The course, held in conjunction with the University of New Mexico

  19. Siemens Westinghouse Power Generation SWPG | Open Energy Information

    Open Energy Info (EERE)

    Pennsylvania Zip: PA 15235-5 Product: Siemens Westinghouse Power Generation is the fuel cell subsidiary of Siemens Power Generation. It develops and manufactures stationary...

  20. Enforcement Letter, Westinghouse Savannah River Company- June 4, 1996

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Potential Violations of the Quality Assurance and Occupational Radiation Protection Rules at the Savannah River Site

  1. Enforcement Letter, Westinghouse Waste Isolation Division- October 3, 2000

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Waste Isolation Division related to Quality Assurance and Occupational Radiation Protection Noncompliances at the Waste Isolation Pilot Plant

  2. Westinghouse and Fuzhou Permitted to Restart Distribution of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    conservation standard and may be sold in the United States. These 11 Westinghouse brand lamps, usually used in recessed light fixtures, correspond to 7 basic models, which are...

  3. Westinghouse Lighting: Noncompliance Determination (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE issued a Notice of Noncompliance Determination to Westinghouse Lighting Corporation finding that various models of incandescent reflector lamps do not comport with the energy conservation standards.

  4. Westinghouse Earns Mine Safety Award for Exceptional Underground...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    On September 19, New Mexico State Inspector of Mines Gilbert Miera and the New Mexico Mining Association presented Westinghouse with the "Mine Operator of the Year" award. The...

  5. Westinghouse Earns 15th Consecutive Mine Safety Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for profit. This award recognizes Westinghouse's close attention to safety in a mining environment. WTS is the management and operating contractor for the DOE at the Waste...

  6. Westinghouse earns top award from quality new mexico

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Earns Top Award From Quality New Mexico CARLSBAD, N.M., January 11, 2000 - The Westinghouse Waste Isolation Division led a group of three Carlsbad organizations recognized by...

  7. Enforcement Letter, Westinghouse Savannah River Company- April 15, 1997

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Potential Violations of Quality Assurance and Work Process Requirements at the Savannah River Site

  8. Inspection of Westinghouse Savannah River Company Fees for Managing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... than originally expected. "In addition, infusion of WEC personnel . . . has occurred at a ... corporate involvement; (2) The large infusion of Westinghouse corporate personnel into ...

  9. Enforcement Letter, Westinghouse Hanford Corporation- July 6, 1995

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Hanford Corporation related to Radiological Work Control Deficiencies at the Plutonium Uranium Extraction Facility at the Hanford Site

  10. Preliminary LOCA analysis of the westinghouse small modular reactor using the WCOBRA/TRAC-TF2 thermal-hydraulics code

    SciTech Connect (OSTI)

    Liao, J.; Kucukboyaci, V. N.; Nguyen, L.; Frepoli, C.

    2012-07-01

    The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (> 225 MWe) integral pressurized water reactor (iPWR) with all primary components, including the steam generator and the pressurizer located inside the reactor vessel. The reactor core is based on a partial-height 17x17 fuel assembly design used in the AP1000{sup R} reactor core. The Westinghouse SMR utilizes passive safety systems and proven components from the AP1000 plant design with a compact containment that houses the integral reactor vessel and the passive safety systems. A preliminary loss of coolant accident (LOCA) analysis of the Westinghouse SMR has been performed using the WCOBRA/TRAC-TF2 code, simulating a transient caused by a double ended guillotine (DEG) break in the direct vessel injection (DVI) line. WCOBRA/TRAC-TF2 is a new generation Westinghouse LOCA thermal-hydraulics code evolving from the US NRC licensed WCOBRA/TRAC code. It is designed to simulate PWR LOCA events from the smallest break size to the largest break size (DEG cold leg). A significant number of fluid dynamics models and heat transfer models were developed or improved in WCOBRA/TRAC-TF2. A large number of separate effects and integral effects tests were performed for a rigorous code assessment and validation. WCOBRA/TRAC-TF2 was introduced into the Westinghouse SMR design phase to assist a quick and robust passive cooling system design and to identify thermal-hydraulic phenomena for the development of the SMR Phenomena Identification Ranking Table (PIRT). The LOCA analysis of the Westinghouse SMR demonstrates that the DEG DVI break LOCA is mitigated by the injection and venting from the Westinghouse SMR passive safety systems without core heat up, achieving long term core cooling. (authors)

  11. Westinghouse Pays $50,000 Civil Penalty to Resolve Light Bulb...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Westinghouse Pays 50,000 Civil Penalty to Resolve Light Bulb Efficiency Violations Westinghouse Pays 50,000 Civil Penalty to Resolve Light Bulb Efficiency Violations December 13, ...

  12. Preliminary Notice of Violation, Westinghouse Savannah River Company -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-2000-02 | Department of Energy 2 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA-2000-02 March 6, 2000 Issued to Westinghouse Savannah River Company, related to Procurement Quality Assurance and Quality Improvement Deficiencies at the Savannah River Site. On March 6, 2000, the U.S. Department of Energy issued a Preliminary Notice of Violation (EA-2000-02) to Westinghouse Savannah River Company for violations of 10 C.F.R. 830 associated with the procurement of

  13. Preliminary Notice of Violation, Westinghouse Savannah River Company -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-2000-08 | Department of Energy 8 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA-2000-08 July 18, 2000 Issued to Westinghouse Savannah River Company, related to Unplanned Exposures and Radioactive Material Intakes at the Savannah River Site (EA-2000-08) On July 18, 2000, the U.S. Department of Energy y issued a Preliminary Notice of Violation (EA-2000-08) to Westinghouse Savannah River Company for violations of 10 C.F.R. Parts 830 and 835 associated with the

  14. VBR-0002- In the Matter of Westinghouse Savannah River Company

    Broader source: Energy.gov [DOE]

    This supplemental order concerns a Motion for Reconsideration (Case No. VBR-0002) filed by Westinghouse Savannah River Company (WSRC) on November 12, 1999. The reconsideration motion relates to an...

  15. LWZ-0031- In the Matter of Westinghouse Hanford Company

    Broader source: Energy.gov [DOE]

    This determination will consider a Motion to Dismiss filed by Westinghouse Hanford Company (WHC) on April 5, 1994. In its Motion, WHC seeks the dismissal of the underlying complaint and hearing...

  16. Westinghouse TRU Solutions LLC Earns Superior Star Award for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CARLSBAD, N.M., September 20, 2001 - The U.S. Department of Energy (DOE) has recognized Westinghouse TRU Solutions LLC (WTS) for its ongoing safety performance with the Voluntary ...

  17. Westinghouse Lighting: Proposed Penalty (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Westinghouse Lighting Corporation failed to certify various flourescent and incandescent reflector lamps as compliant with the applicable energy conservation standards.

  18. PRELIMINARY SURVEY OF WESTINGHOUSE ELECTRIC CORPORATION EAST PITTSBURGH, PENNSYLVANIA

    Office of Legacy Management (LM)

    WESTINGHOUSE ELECTRIC CORPORATION EAST PITTSBURGH, PENNSYLVANIA Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program WESTINGHOUSE ELECTRIC CORPORATION EAST PITTSBURGH, PENNSYLVANIA At the request of the Department of Energy (DOE, then ERDA), a preliminary survey

  19. Westinghouse TRU Solutions LLC Earns Small Business Program Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Immediate Release Westinghouse TRU Solutions LLC Earns Small Business Program Award CARLSBAD, N.M., July 10, 2001 - Westinghouse TRU Solutions LLC (WTS) was recognized recently by the U.S. Department of Energy (DOE) with the Outstanding HUBZone Business Achievement Award. WTS was selected for the award by DOE's Secretarial Small Business Program "This award is a reflection of our commitment to DOE's Small Business Program to provide opportunities for small business concerns," said

  20. Preliminary Notice of Violation, Westinghouse Savannah River Company - EA

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2004-03 | Department of Energy EA 2004-03 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 2004-03 April 6, 2004 This letter refers to the Department of Energy's Office of Price-Anderson Enforcement (OE) investigation of the facts and circumstances concerning the unnecessary radiation exposure of three Westinghouse Savannah River Company (WSRC) personnel and the subsequent falsification of radiation dose records. On April 6, 2004, the U.S. Department of Energy (DOE)

  1. Audit of staffing requirements at the Westinghouse Savannah River Company

    SciTech Connect (OSTI)

    Not Available

    1994-01-25

    The Westinghouse Savannah River Company operates the Savannah River Site for the US Department of Energy (Department) under a cost-plus-award-fee contract. Department policies require contractors to ensure a high level of performance in operating Department facilities by establishing operating standards, assessing performance against such standards, and holding contractor employees accountable for their performance. The purpose of the audit was to review Westinghouse`s policies and practices for determining staffing requirements. Since assuming responsibility for the Savannah River Site in 1989, Westinghouse increased its staffing by over 4,000 employees. The Department had undertaken some actions to reduce the number of contractor employees at the Savannah River Site. Our audit showed that the use of industry and federal performance work standards in its construction and management activities could enable Westinghouse to further reduce its staff by over 1,800 employees. The potential savings in salaries and benefits associated with such action could be about $399 million over a 5-year period. Additional staffing reductions could be attained through the use of engineered time standards in the maintenance and fabrication shops. In addition, Westinghouse significantly understated, in periodic reports to the Department, the personnel resources applied to accomplish contract requirements. Of course, the actual staffing reductions realized would be largely determined by the manner in which the work standards are implemented and the levels of proficiency attained by the workforce.

  2. Westinghouse Small Modular Reactor passive safety system response to postulated events

    SciTech Connect (OSTI)

    Smith, M. C.; Wright, R. F.

    2012-07-01

    The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor. This paper is part of a series of four describing the design and safety features of the Westinghouse SMR. This paper focuses in particular upon the passive safety features and the safety system response of the Westinghouse SMR. The Westinghouse SMR design incorporates many features to minimize the effects of, and in some cases eliminates the possibility of postulated accidents. The small size of the reactor and the low power density limits the potential consequences of an accident relative to a large plant. The integral design eliminates large loop piping, which significantly reduces the flow area of postulated loss of coolant accidents (LOCAs). The Westinghouse SMR containment is a high-pressure, compact design that normally operates at a partial vacuum. This facilitates heat removal from the containment during LOCA events. The containment is submerged in water which also aides the heat removal and provides an additional radionuclide filter. The Westinghouse SMR safety system design is passive, is based largely on the passive safety systems used in the AP1000{sup R} reactor, and provides mitigation of all design basis accidents without the need for AC electrical power for a period of seven days. Frequent faults, such as reactivity insertion events and loss of power events, are protected by first shutting down the nuclear reaction by inserting control rods, then providing cold, borated water through a passive, buoyancy-driven flow. Decay heat removal is provided using a layered approach that includes the passive removal of heat by the steam drum and independent passive heat removal system that transfers heat from the primary system to the environment. Less frequent faults such as loss of coolant accidents are mitigated by passive injection of a large quantity of water that is readily available inside containment. An automatic depressurization system is used to

  3. Westinghouse receives high marks for management, operation of WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Receives High Marks For Management, Operation of WIPP CARLSBAD, N.M., January 11, 2000 - The Westinghouse Waste Isolation Division (WID) received high marks from the U.S. Department of Energy (DOE) for its management and operation of the Waste Isolation Pilot Plant (WIPP) in fiscal year 1999. For the 12-month performance evaluation period from October 1, 1998 through September 30, 1999, Westinghouse received 94.9 of a possible 100 points. The DOE considers a score of 86 to 95 as good. A score

  4. EXC-12-0011- In the Matter of Westinghouse Lighting Corporation

    Broader source: Energy.gov [DOE]

    On September 17, 2012, OHA issued a decision granting an Application for Exception filed by Westinghouse Lighting Corporation (Westinghouse) for relief from the provisions of 10 C.F.R. Part 430,...

  5. Westinghouse Cementation Facility of Solid Waste Treatment System - 13503

    SciTech Connect (OSTI)

    Jacobs, Torsten; Aign, Joerg

    2013-07-01

    During NPP operation, several waste streams are generated, caused by different technical and physical processes. Besides others, liquid waste represents one of the major types of waste. Depending on national regulation for storage and disposal of radioactive waste, solidification can be one specific requirement. To accommodate the global request for waste treatment systems Westinghouse developed several specific treatment processes for the different types of waste. In the period of 2006 to 2008 Westinghouse awarded several contracts for the design and delivery of waste treatment systems related to the latest CPR-1000 nuclear power plants. One of these contracts contains the delivery of four Cementation Facilities for waste treatment, s.c. 'Follow on Cementations' dedicated to three locations, HongYanHe, NingDe and YangJiang, of new CPR-1000 nuclear power stations in the People's Republic of China. Previously, Westinghouse delivered a similar cementation facility to the CPR-1000 plant LingAo II, in Daya Bay, PR China. This plant already passed the hot functioning tests successfully in June 2012 and is now ready and released for regular operation. The 'Follow on plants' are designed to package three 'typical' kind of radioactive waste: evaporator concentrates, spent resins and filter cartridges. The purpose of this paper is to provide an overview on the Westinghouse experience to design and execution of cementation facilities. (authors)

  6. Westinghouse, DOE see apples, oranges in IG staffing report

    SciTech Connect (OSTI)

    Lobsenz, G.

    1994-03-01

    The operator of the Energy Department's Savannah River weapons plant has at least 1,800 more employees than it needs, and could save $400 million over a five-year period by cutting its staff accordingly, a DOE inspector general study says. Most of the boat - 1,206 employees - was attributed to excessive numbers of managers, with the inspector general concluding that Westinghouse Savannah River Co. had roughly twice as many layers of management than two other DOE weapons contractors. The study also concluded that Westinghouse in fiscal year 1992 significantly understated its actual staffing levels in reports to DOE, failing to disclose 1,765 full-time employees or the equivalent hours worked. Through such underreporting Westinghouse was able to [open quotes]circumvent staffing ceilings established by the department,[close quotes] the study added. Overall, DOE Inspector General John Layton said Westinghouse's staff levels substantially exceeded those needed for efficient operation of the South Carolina nuclear weapons facility. Layton based his analysis on efficiency standards attained by other DOE weapons plant contractors, such as Martin Marietta Energy Systems at DOE's Oak Ridge, Tenn., plant and EG G Rocky Flats, as well as widely utilized worker performance requirements used by the Navy and private sector companies that perform work similar to that done at Savannah River.

  7. Westinghouse TRU Solutions LLC Earns Corporate Award for Mining Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Earns Corporate Award for Mining Operations CARLSBAD, N.M., May 3, 2001 - Washington Group International has selected Westinghouse TRU Solutions LLC (WTS) for a 2000 Eagle Award. WTS is the management and operating contractor for the U.S. Department of Energy (DOE) at the Waste Isolation Pilot Plant (WIPP). Washington Group International's annual Eagle Awards Program acknowledges and honors extraordinary projects, teams and individual performers. Washington Group International is the parent

  8. DOE - Office of Legacy Management -- Westinghouse Advanced Reactors Div

    Office of Legacy Management (LM)

    Plutonium and Advanced Fuel Labs - PA 10 Advanced Reactors Div Plutonium and Advanced Fuel Labs - PA 10 FUSRAP Considered Sites Site: WESTINGHOUSE ADVANCED REACTORS DIV., PLUTONIUM FUEL LABORATORIES, AND THE ADVANCED FUEL LAB (PA.10 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Cheswick , Pennsylvania PA.10-1 Evaluation Year: Circa 1987 PA.10-1 PA.10-4 Site Operations: 1960s and 1970s - Produced light water and fast

  9. DOE - Office of Legacy Management -- Westinghouse Atomic Power Development

    Office of Legacy Management (LM)

    Plant - PA 04 Power Development Plant - PA 04 FUSRAP Considered Sites Site: WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT (PA.04 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: East Pittsburgh , Pennsylvania PA.04-1 Evaluation Year: 1985 PA.04-2 Site Operations: Research and development on uranium oxide fuel elements in the 1940s. PA.04-3 PA.04-5 Site Disposition: Eliminated - Radiation levels below criteria PA.04-1 Radioactive

  10. Westinghouse Completes its AP1000 Test Stand

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse Completes its AP1000 Test Stand  VERA-CS Coupled Multi-physics Capability demonstrated in a Full-core Simulation  TVA provides Watts Bar Operating Data to Support Validation of CASL Tools  University of Michigan adds Depletion Capability to MPACT for VERA-CS  VERA Data Transfer Processes Provided by DTK  Alternate Coupling Algorithm Investigations Completed  Role of HPC in the Nuclear Power Industry  TVA Test Stand Launched November 2013 Volume 1, Issue 4

  11. Preliminary Notice of Violation, Westinghouse Savannah River Company- EA 98-09

    Broader source: Energy.gov [DOE]

    Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to Bioassay Program Deficiencies at the Savannah River Site, (EA-98-09)

  12. Preliminary Notice of Violation, Westinghouse Savannah River Company- EA-97-12

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company, related to an Unplanned Radioactive Material Intake at the Savannah River Site, (EA-97-12)

  13. DOE Requires Westinghouse to Cease Sales of Two Light Bulb Models...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company to allow the companies to resume sales of an incandescent reflector lamp ... issued Notices allowing Fuzhou and Westinghouse to resume distribution of those products. ...

  14. Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb Products

    Broader source: Energy.gov [DOE]

    The Department has issued Notices of Allowance to Westinghouse Lighting Corporation and Fuzhou Sunlight Lighting Electrical Appliance Company determining, based on corrected test data provided by...

  15. Preliminary Notice of Violation, Westinghouse Savannah River Company- EA-2002-01

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Safety Basis and Radiation Protection Violations at the Savannah River Site, March 19, 2002 (EA-2002-01)

  16. Microsoft Word - DOE-ID-13-004 Westinghouse EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modeling and Validation of Sodium Plugging for Heat Exchangers in Sodium-cooled Fast Reactor Systems - Westinghouse Electric Company LLC SECTION B. Project Description ...

  17. Office of Inspector General audit report on Westinghouse Savannah River Company`s withdrawal of fees

    SciTech Connect (OSTI)

    1999-04-01

    As the operator of the Department`s Savannah River Site, Westinghouse Savannah River Company (Westinghouse) receives three types of fees: (1) award fees commensurate with the overall performance rating, (2) Performance Based Incentive (PBI) fees for achieving measurable goals or defined tasks as specified in annual operating plans, and (3) Cost Reduction Incentive Program (CRIP) fees for making improvements in site operations that reduce total contract costs. The Department`s Contracting Officer notifies Westinghouse when fees are earned, and Westinghouse withdraws the authorized amounts from the Department`s letter-of-credit account. The audit objective was to determine whether Westinghouse withdrew the appropriate amount of fees from the letter-of-credit account in Fiscal Years (FY) 1997 an 1998.

  18. CO{sub 2} pellet decontamination technology at Westinghouse Hanford

    SciTech Connect (OSTI)

    Aldridge, T.L.; Aldrich, L.K. II; Bowman, E.V.

    1994-04-01

    Experimentation and testing with CO{sub 2}, pellet decontamination technology is being conducted at Westinghouse Hanford Company (WHC), Richland, Washington. There are 1100 known existing waste sites at Hanford. The sites specified by federal and state agencies are currently being studied to determine the appropriate cleanup methods best for each site. These sites are contaminated and work on them is in compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). There are also 63 treatment, storage, and disposal units, for example: groups of waste tanks or drums. In 1992, there were 100 planned activities scheduled to bring these units into the Resource Conservation and Recovery Act (RCRA) compliance or close them after waste removal. Ninety-six of these were completed. The remaining four were delayed or are being negotiated with regulatory agencies. As a result of past defense program activities at Hanford a tremendous volume of materials and equipment have accumulated and require remediation.

  19. Confined space entry program for the Westinghouse Hanford Company

    SciTech Connect (OSTI)

    Cornell, T.M.

    1993-11-01

    To comply with anticipated OSHA regulatory requirements concerning Permit-Required Confined Spaces, Westinghouse Hanford Company (WHC) created a Confined Spaces Task Team. The primary focus of the task team was to prepare a formal Confined Space Entry (CSE) Program that would ensure full compliance with the anticipated OSHA requirements. A comprehensive training plan was also prepared and submitted for approval as soon as the new CSE Program was approved and released for implementation. On January 14, 1993, OSHA released their final ruling which contained several further changes, requiring the WHC Confined Space Entry Program and Training Plan to be revised. The revised training manual and lessons learned in establishing a Confined Space Entry Program are presented.

  20. Westinghouse 100 kWe SOFC demonstration status

    SciTech Connect (OSTI)

    Veyo, S.

    1996-12-31

    The world`s first 100 kWe class Solid Oxide Fuel Cell (SOFC) power generation system is being supplied by Westinghouse and is sponsored by EDB/ELSAM, a consortium of Dutch and Danish utilities. This natural gas fueled experimental field unit will be installed near Arnhem, The Netherlands, at an auxiliary district heating plant. The module utilizes tubular Air Electrode Supported SOFCs. The system will achieve an electrical generation efficiency of 49%, and this combined with recovery of heat for district heating can yield an overall fuel effectiveness approaching 80%. Significant progress toward reduction of CO{sub 2}, a greenhouse gas, will be obtained, and the system will be environmentally benign.

  1. Westinghouse Waste Simulation and Optimization Software Tool - 13493

    SciTech Connect (OSTI)

    Mennicken, Kim [Westinghouse Electric Germany GmbH, Global Waste Management, Dudenstrasse 44, D-68167 Mannheim (Germany)] [Westinghouse Electric Germany GmbH, Global Waste Management, Dudenstrasse 44, D-68167 Mannheim (Germany); Aign, Joerg [Westinghouse Electric Germany GmbH, Global Waste Management, Tarpenring 6, D-22419 Hamburg (Germany)] [Westinghouse Electric Germany GmbH, Global Waste Management, Tarpenring 6, D-22419 Hamburg (Germany)

    2013-07-01

    Radioactive waste is produced during NPP operation and NPP D and D. Different kinds of waste with different volumes and properties have to be treated. Finding a technically and commercially optimized waste treatment concept is a difficult and time consuming process. The Westinghouse waste simulation and optimization software tool is an approach to study the total life cycle cost of any waste management facility. The tool enables the user of the simulation and optimization software to plan processes and storage buildings and to identify bottlenecks in the overall waste management design before starting detailed planning activities. Furthermore, application of the software enables the user to optimize the number of treatment systems, to determine the minimum design capacity for onsite storage facilities, to identify bottlenecks in the overall design and to identify the most cost-effective treatment paths by maintaining optimal waste treatment technologies. In combination with proven waste treatment equipment and integrated waste management solutions, the waste simulation and optimization software provides reliable qualitative results that lead to an effective planning and minimization of the total project planning risk of any waste management activity. (authors)

  2. The Westinghouse solid oxide fuel cell program: Clean, efficient energy for the future

    SciTech Connect (OSTI)

    Gockley, G.B.

    1992-01-01

    This paper provides an overview of the Westinghouse tubular SOFC technology and field testing program. The development program for the field testing was initiated in 1986 with a 400 W unit. This program has progressed to the installation and start-up in early 1992 of the 25 kill field unit at Rokko Island in Japan. In mid-1992 the second 25 kill field unit, a cogeneration system producing both ac electric power and intermediate pressure steam, will be delivered to the Joint Gas Utilities, a consortium of the Tokyo Gas Company and the Osaka Gas Company. This will be followed by the 20 kill SOFC unit to be supplied to Southern California Edison in early 1993. Future plans include the 100 kill Cogeneration Proof-of-Concept unit for the Southern California Gas Company which is scheduled for delivery in late 1993. Applications for SOFC technology range from on-site power generation for commercial second small industrial applications to dispersed generating plants and central station electric power generation. The design studies have included integrated coal gasification SOFC-steam turbine power plants. Installed capital costs of a 250 MW plant of this configuration compares favorably with the integrated coal gasification combined cycle plants.

  3. The Westinghouse solid oxide fuel cell program: Clean, efficient energy for the future

    SciTech Connect (OSTI)

    Gockley, G.B.

    1992-12-01

    This paper provides an overview of the Westinghouse tubular SOFC technology and field testing program. The development program for the field testing was initiated in 1986 with a 400 W unit. This program has progressed to the installation and start-up in early 1992 of the 25 kill field unit at Rokko Island in Japan. In mid-1992 the second 25 kill field unit, a cogeneration system producing both ac electric power and intermediate pressure steam, will be delivered to the Joint Gas Utilities, a consortium of the Tokyo Gas Company and the Osaka Gas Company. This will be followed by the 20 kill SOFC unit to be supplied to Southern California Edison in early 1993. Future plans include the 100 kill Cogeneration Proof-of-Concept unit for the Southern California Gas Company which is scheduled for delivery in late 1993. Applications for SOFC technology range from on-site power generation for commercial second small industrial applications to dispersed generating plants and central station electric power generation. The design studies have included integrated coal gasification SOFC-steam turbine power plants. Installed capital costs of a 250 MW plant of this configuration compares favorably with the integrated coal gasification combined cycle plants.

  4. Westinghouse Pays $50,000 Civil Penalty to Resolve Light Bulb Efficiency Violations

    Broader source: Energy.gov [DOE]

    The Department of Energy has successfully resolved the enforcement case against Westinghouse Lighting Corporation for failure to certify its light bulbs as compliant with DOE’s federal efficiency...

  5. DOE Requires Westinghouse to Cease Sales of Two Light Bulb Models and Allows Sale of Another

    Broader source: Energy.gov [DOE]

    As a part of DOE's continuing enforcement action against Westinghouse Lighting Corporation, the company must cease sales of two light bulb models - medium based CFL basic model 15GLOBE/65/2 ...

  6. Microsoft Word - DOE-ID-14-089 Westinghouse EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: Development of Thermo-Acoustic Sensors for Sodium-cooled Fast Reactors - Westinghouse Electric Company LLC SECTION B. Project Description Westinghouse will conduct research and development on developing self-powered, wireless Thermo-Acoustic Sensors capable of measuring local temperature and neutron flux in a Sodium-cooled Fast Reactor. The work will consist of the design, construction and testing on a small, laboratory scale sodium existing facility at Argonne

  7. Age-related degradation of Westinghouse 480-volt circuit breakers

    SciTech Connect (OSTI)

    Subudhi, M.; Shier, W.; MacDougall, E. )

    1990-07-01

    An aging assessment of Westinghouse DS-series low-voltage air circuit breakers was performed as part of the Nuclear Plant Aging Research (NPAR) program. The objectives of this study are to characterize age-related degradation within the breaker assembly and to identify maintenance practices to mitigate their effect. Since this study has been promulgated by the failures of the reactor trip breakers at the McGuire Nuclear Station in July 1987, results relating to the welds in the breaker pole lever welds are also discussed. The design and operation of DS-206 and DS-416 breakers were reviewed. Failure data from various national data bases were analyzed to identify the predominant failure modes, causes, and mechanisms. Additional operating experiences from one nuclear station and two industrial breaker-service companies were obtained to develop aging trends of various subcomponents. The responses of the utilities to the NRC Bulletin 88-01, which discusses the center pole lever welds, were analyzed to assess the final resolution of failures of welds in the reactor trips. Maintenance recommendations, made by the manufacturer to mitigate age-related degradation were reviewed, and recommendations for improving the monitoring of age-related degradation are discussed. As described in Volume 2 of this NUREG, the results from a test program to assess degradation in breaker parts through mechanical cycling are also included. The testing has characterized the cracking of center-pole lever welds, identified monitoring techniques to determine aging in breakers, and provided information to augment existing maintenance programs. Recommendations to improve breaker reliability using effective maintenance, testing, and inspection programs are suggested. 13 refs., 21 figs., 8 tabs.

  8. Westinghouse Hanford Company quality assurance program and implementation plan

    SciTech Connect (OSTI)

    Moss, S.S., Westinghouse Hanford

    1996-07-01

    This is the first revision of the Quality AssurancePlan/Implementation Plan (QAP/IP) for nuclear facilities managedand operated by the Westinghouse Hanford Company (WHC).Development of the initial IP required review of the WHC qualityassurance program to the requirements of the 10 CFR 830.120, andcompletion of initial baseline assessments against the QAP toverify implementation of the program. Each WHC-managed nuclearfacility provided a stand-alone section to the QAP/IP, describingits mission and life-cycle status. WHC support organizationsalso performed assessments for their lead areas, and providedinputs to a separate stand-alone section with the initialbaseline assessment results. In this first revision, the initialbaseline matrixes for those facilities found to be in compliancewith the QAP have been removed. Tank Waste Remediation System(TWRS) and K Basins have modified their baseline matrixes to showcompletion of action items to date. With the followingexceptions, the WHC-managed nuclear facilities and their supportorganizations were found to have implemented QA programs thatsatisfy the requirements of 10 CFR 830.120. TWRS identifiedImplementation Plan Action Items having to do with: generationand revision of as-built drawings; updating TWRS organizationaland program documents; tracking the condition/age ofmaterials/equipment; and reconstitution of design bases forexisting, active facilities. No incremental funding needs wereidentified for FY95. For FY97, TWRS identified incrementalfunding in the amount of $65,000 for as-built drawings, and$100,000 for tracking the age/condition of materials/equipment.The K Basin Fuel Storage Facility identified Implementation PlanAction Items having to do with: training; updating procedures;establishing configuration management; reconstituting designbases; and providing darwings; and developing integrated,resource-loaded schedules. Incremental funding needs in theamount of $1.7 million were identified, over a time

  9. Microsoft Word - 1aDOE-ID-12-047 Westinghouse EC B3-6 NRC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A. Project Title: Development of LWR Fuels Enhanced Accident Tolerance - Westinghouse Electric ... the currently used Zr + UO2 fuel system with and enhanced accident tolerant fuel. ...

  10. DOE Initiates Enforcement Proceedings against Westinghouse and Mitsubishi for Failure to Certify (Notice of Proposed Civil Penalty Issued)

    Broader source: Energy.gov [DOE]

    The Office of General Counsel has issued Notices of Proposed Civil Penalty to Westinghouse Lighting Corporation and Mitsubishi Electric & Electronics USA, Inc. for failing to certify that...

  11. 1992 Environmental Summer Science Camp Program evaluation. The International Environmental Institute of Westinghouse Hanford Company

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This report describes the 1992 Westinghouse Hanford Company/US Department of Energy Environmental Summer Science Camp. The objective of the ``camp`` was to motivate sixth and seventh graders to pursue studies in math, science, and the environment. This objective was accomplished through hands-on fun activities while studying the present and future challenges facing our environment. The camp was funded through Technical Task Plan, 424203, from the US Department of Energy-Headquarters, Office of Environmental Restoration and Waste Management, Technology Development,to Westinghouse Hanford Company`s International Environmental Institute, Education and Internship Performance Group.

  12. CASL-U-2015-0132-000 Fausto Franceschini Westinghouse Electric Co. LLC,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    32-000 Fausto Franceschini Westinghouse Electric Co. LLC, March 26, 2015 AP1000 ® PWR Startup Core Modeling and Simulation with VERA-CS CASL-U-2015-0132-000 F Advances in Nuclear Fuel Management V (ANFM 2015) Hilton Head Island, South Carolina, USA, March 29 - April 1, 2015, on CD-ROM, American Nuclear Society, LaGrange Park, IL (2015) © 2015 Westinghouse Electric Company LLC. All Rights Reserved. p. 1/12 AP1000 ® PWR STARTUP CORE MODELING AND SIMULATION WITH VERA-CS F. Franceschini

  13. L1:PAC.P6.04 Westinghouse Test Stand Technical Readiness Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    L1:PAC.P6.04 Westinghouse Test Stand Technical Readiness Review Andrew Godfrey ORNL Completed: June 25, 2013 CASL-8-2013-01 -000 D Consortium for Advanced Simulation of LWRs Consortium for Advanced Simulation of Light Water Reactors Bldg. 5700, Room E309, MS 6003 P.O. Box 2008 Oak Ridge, TN 37831-6003 Email: casl-info@ornl.gov Date: 6/25/2013 To: Jess Gehin c: Erik Walker, Mark Baird, From: Andrew Godfrey Subject: Westinghouse Test Stand Technical Readiness Review Jess, I have completed a

  14. Westinghouse Hanford Company (WHC) standards/requirements identification document (S/RID)

    SciTech Connect (OSTI)

    Bennett, G.L.

    1996-03-15

    This Standards/Requirements Identification Document (S/RID) set forth the Environmental Safety and Health (ES&H) standards/requirements for Westinghouse Hanford Company Level Programs, where implementation and compliance is the responsibility of these organizations. These standards/requirements are adequate to ensure the protection of the health and safety of workers, the public, and the environment.

  15. Evolution of Westinghouse heavy-duty power generation and industrial combustion turbines

    SciTech Connect (OSTI)

    Scalzo, A.J.; Bannister, R.L.; DeCorso, M.; Howard, G.S.

    1996-04-01

    This paper reviews the evolution of heavy-duty power generation and industrial combustion turbines in the United States from a Westinghouse Electric Corporation perspective. Westinghouse combustion turbine genealogy began in March of 1943 when the first wholly American designed and manufactured jet engine went on test in Philadelphia, and continues today in Orlando, Florida, with the 230 MW, 501G combustion turbine. In this paper, advances in thermodynamics, materials, cooling, and unit size will be described. Many basic design features such as two-bearing rotor, cold-end drive, can-annular internal combustors, CURVIC{sup 2} clutched turbine disks, and tangential exhaust struts have endured successfully for over 40 years. Progress in turbine technology includes the clean coal technology and advanced turbine systems initiatives of the US Department of Energy.

  16. DOE - Office of Legacy Management -- Westinghouse Atomic Power Div - PA 16

    Office of Legacy Management (LM)

    Power Div - PA 16 FUSRAP Considered Sites Site: WESTINGHOUSE ATOMIC POWER DIV. (PA.16 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Route 30 (Forrest Hills) , Pittsburgh , Pennsylvania PA.16-1 Evaluation Year: 1985 PA.16-1 Site Operations: Processed uranium metal for research and development and pilot-scale production of uranium oxide fuel elements. Prepared uranium metal for Enrico Fermi's Stagg Field experiment. PA.16-1 Site

  17. Westinghouse Offers $6,400 in College Scholarships to Eddy County Students

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Offers $6,400 in College Scholarships to Eddy County Students CARLSBAD, N.M., February 18, 2000 - The Westinghouse Government Services Group today announced that $6,400 in college scholarships will be awarded to Eddy County students for the 2000-2001 school year. The deadline to apply is April 3. Two $2,500 scholarships are being offered - one will be honored at New Mexico State University (NMSU) in Las Cruces, and one at the College of the Southwest (CSW) in Carlsbad. High school seniors

  18. Detection and mitigating rod drive control system degradation in Westinghouse PWRs

    SciTech Connect (OSTI)

    Gunther, W.; Sullivan, K.

    1990-01-01

    A study of the effects of aging on the Westinghouse Control Rod Drive (CRD) System was performed as part of the US NRC's Nuclear Plant aging Research (NPAR) Program. For the study, the CRD system boundary includes the power and logic cabinets associated with the manual control rod movement, and the control rod mechanism itself. The aging-related degradation of the interconnecting cables and connectors and the rod position indicating system also were considered. This paper presents the results of that study pertaining to the electrical and instrumentation portions of the CRD system including ways to detect and mitigate system degradation.

  19. U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site

    SciTech Connect (OSTI)

    1995-08-03

    During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

  20. Westinghouse Hanford Company operational environmental monitoring annual report, calendar year 1994

    SciTech Connect (OSTI)

    Schmidt, J.; Fassett, J.W.; Johnson, A.R.; Johnson, V.G.; Markes, B.M.; McKinney, S.M.; Moss, K.J.; Perkins, C.J.; Richterich, L.R.

    1995-08-01

    This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1994 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

  1. Assessment of ISLOCA risk: Methodology and application to a Westinghouse four-loop ice condenser plant

    SciTech Connect (OSTI)

    Kelly, D.L.; Auflick, J.L.; Haney, L.N.

    1992-04-01

    Inter-system loss-of-coolant accidents (ISLOCAs) have been identified as important contributors to offsite risk for some nuclear power plants. A methodology has been developed for identifying and evaluating plant-specific hardware designs, human factors issues, and accident consequence factors relevant to the estimation of ISLOCA core damage frequency and risk. This report presents a detailed description of the application of this analysis methodology to a Westinghouse four-loop ice condenser plant. This document also includes appendices A through I which provide: System descriptions; ISLOCA event trees; human reliability analysis; thermal hydraulic analysis; core uncovery timing calculations; calculation of system rupture probability; ISLOCA consequences analysis; uncertainty analysis; and component failure analysis.

  2. Test Plan for Westinghouse Hanford Company`s Hedgehog Shielded Container, Docket 94-39-7A, Type A Container

    SciTech Connect (OSTI)

    Kelly, D.L.

    1995-02-27

    This report documents the US Department of Transportation Specification 7A Type A (DOT-7A) compliance testing to be followed for qualification of the Westinghouse Hanford Company`s Hedgehog Shielded Container for use as a Type A packaging. The packaging configurations being tested are intended for liquids and solids, and for air transportation.

  3. Radioactive waste shipments to Hanford retrievable storage from Westinghouse Advanced Reactors and Nuclear Fuels Divisions, Cheswick, Pennsylvania

    SciTech Connect (OSTI)

    Duncan, D.; Pottmeyer, J.A.; Weyns, M.I.; Dicenso, K.D.; DeLorenzo, D.S.

    1994-04-01

    During the next two decades the transuranic (TRU) waste now stored in the burial trenches and storage facilities at the Hanford Sits in southeastern Washington State is to be retrieved, processed at the Waste Receiving and Processing Facility, and shipped to the Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico for final disposal. Approximately 5.7 percent of the TRU waste to be retrieved for shipment to WIPP was generated by the decontamination and decommissioning (D&D) of the Westinghouse Advanced Reactors Division (WARD) and the Westinghouse Nuclear Fuels Division (WNFD) in Cheswick, Pennsylvania and shipped to the Hanford Sits for storage. This report characterizes these radioactive solid wastes using process knowledge, existing records, and oral history interviews.

  4. Pressurized solid oxide fuel cell/gas turbine combined cycle systems

    SciTech Connect (OSTI)

    George, R.A.

    1997-12-31

    Over the last 10 years, Westinghouse Electric Corporation has made great strides in advancing tubular solid oxide fuel cell (SOFC) technology towards commercialization by the year 2001. In 1993, Westinghouse initiated a program to develop pressurized solid oxide fuel cell/gas turbine (PSOFC/GT) combined cycle power systems because of the ultra-high electrical efficiencies, 60-75% (net AC/LHV CH4), inherent with these systems. This paper will discuss SOFC technology advancements in recent years, and the final phase development program which will focus on the development and demonstration of PSOFC/GT power systems for distributed power applications.

  5. Stem thrust prediction model for Westinghouse wedge gate valves with linkage type stem-to-disk connection

    SciTech Connect (OSTI)

    Wang, J.K.; Sharma, V.; Kalsi, M.S.

    1996-12-01

    The Electric Power Research Institute (EPRI) conducted a comprehensive research program with the objective of providing nuclear utilities with analytical methods to predict motor operated valve (MOV) performance under design basis conditions. This paper describes the stem thrust calculation model developed for evaluating the performance of one such valve, the Westinghouse flexible wedge gate valve. These procedures account for the unique functional characteristics of this valve design. In addition, model results are compared to available flow loop and in situ test data as a basis for evaluating the performance of the valve model.

  6. Letter Report for Analytical Results for Two Soil Samples Associated with the Westinghouse Hematite Decommisioning Project in Hematite Missouri

    SciTech Connect (OSTI)

    Ivey, Wade

    2013-10-30

    Oak Ridge Associated Universities (ORAU), under the Oak Ridge Institute for Science and Education (ORISE) contract, received two soil samples on September 26, 2013 from the Westinghouse Hetnatite Decomminsioning project in Hematite, Missouri. The samples were analyzed for thorium-232, radium-226, uranium-235, and uranium-238 by gamma spectrometry and technetium-99 by liquid scintillation analysis. The samples were received in good condition. The sample collection data and identification numbers are tabulated. Also presented are the gamma spectrometry and technetium-99 data, respectively. The pertinent procedure references are included with the data tables.

  7. Hybrid staging of a Lysholm positive displacement engine with two Westinghouse two stage impulse Curtis turbines

    SciTech Connect (OSTI)

    Parker, D.A.

    1982-06-01

    The University of California at Berkeley has tested and modeled satisfactorly a hybrid staged Lysholm engine (positive displacement) with a two stage Curtis wheel turbine. The system operates in a stable manner over its operating range (0/1-3/1 water ratio, 120 psia input). Proposals are made for controlling interstage pressure with a partial admission turbine and volume expansion to control mass flow and pressure ratio for the Lysholm engine.

  8. DOSE RATES FOR WESTINGHOUSE 17X17 MOX PWR SNF IN A WASTE PACKAGE (SCPB: N/A)

    SciTech Connect (OSTI)

    T.L. Lotz

    1997-01-29

    This analysis is prepared by the Mined Geologic Disposal System (MGDS) Waste Package Development Department (WPDD) to estimate the dose rate on and near the surface a Multi-Purpose Canister (MPC) PWR waste package (WP) which is loaded with Westinghouse 17 x 17 mixed oxide (MOX) PWR fuel. The 21 PWR MPC WP is used to provide an upper bound for waste package designs since the 12 PWR MPC WP will have a smaller source term and an equivalent amount of shielding. the objectives of this evaluation are to calculate the requested dose rate(s) and document the calculation in a fashion to allow comparisons to other waste forms and WP designs at a future time.

  9. Advanced development of a pressurized ash agglomerating fluidized-bed coal gasification system. Quarterly progress report, October 1-December 31, 1982

    SciTech Connect (OSTI)

    1983-04-21

    The overall objective of the Westinghouse coal gasification program is to demonstrate the viability of the Westinghouse pressurized, fluidized bed, gasification system for the production of medium-Btu fuel gas for syngas, electrical power generation, chemical feedstocks, or industrial fuels and to obtain performance and scaleup data for the process and hardware. Progress reports are presented for the following tasks: (1) operation and maintenance of the process development unit (PDU); (2) process analysis; (3) cold flow scaleup facility; (4) process component engineering and design; and (5) laboratory support studies involving gas solids flow modeling and coal/ash behavior. 9 figures, 19 tables.

  10. The Lakeland McIntosh Unit 4 demonstration project utilizing Foster Wheeler`s pressurized circulating fluidized-bed combustion technology

    SciTech Connect (OSTI)

    McClung, J.D.; Provol, S.J.; Morehead, H.T.; Dodd, A.M.

    1997-12-31

    The City of Lakeland, Florida, Foster Wheeler and the Westinghouse Electric Corporation have embarked on the demonstration of a Clean Coal Technology at the City of Lakeland`s McIntosh Power Station in lakeland, Polk County, Florida. The project will demonstrate the Pressurized Circulating Fluidized Bed Combustion (PCFB) technology developed by Foster Wheeler and Westinghouse. The Lakeland McIntosh Unit 4 Project is a nominal 170 MW power plant designed to burn a range of low- to high-sulfur coals. The combined cycle plant employs a Westinghouse 251B12 gas turbine engine in conjunction with a steam turbine operating in a 2400/1000/1000 steam cycle. The plant will demonstrate both the PCFB and topped PCFB combustion technologies. This paper provides a process description of the Foster Wheeler PCFB and Topped PCFB technologies and their application to the Lakeland McIntosh Unit 4 Project.

  11. Report for Westinghouse Hanford Company: Makeup procedures and characterization data for modified DSSF and modified remaining inventory simulated tank waste

    SciTech Connect (OSTI)

    Lokken, R.O.

    1996-03-01

    The majority of defense wastes generated from reprocessing spent reactor fuel at Hanford are stored in underground Double-Shell Tanks (DST) and in older Single-Shell Tanks (SST). The Tank Waste Remediation System (TWRS) Program has the responsibility of safely managing and immobilizing these tank wastes for disposal. A reference process flowsheet is being developed that includes waste retrieval, pretreatment, and vitrification. Melter technologies for vitrifying low-level tank wastes are being evaluated by Westinghouse Hanford Company. Chemical simulants are being used in the technology testing. For the first phase of low-level waste (LLW) vitrification simulant development, two waste stream compositions were investigated. The first waste simulant was based on the analyses of six tanks of double-shell slurry feed (DSSF) waste and on the projected composition of the wastes exiting the pretreatment operations. A simulant normalized to 6 M sodium was based on the anticipated chemical concentrations after ion exchange and initial separations. The same simulant concentrated to 10 M sodium would represent a waste that had been concentrated by evaporation to reduce the overall volume. The second LLW simulant, referred to as the remaining inventory (RI), included wastes not included in the DSSF tanks and the projected LLW fraction of single-shell tank wastes.

  12. Pressure Systems

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Engineering > Pressure Systems Privacy and Security Notice Skip over navigation Search the JLab Site Pressure Systems Please upgrade your browser. This site's design is only ...

  13. Update to Risk-Informed Pressurized Water Reactor Vessel 10 to 20 Year Inspection Interval Extension

    SciTech Connect (OSTI)

    Palm, Nathan A.; Bishop, Bruce A.; Boggess, Cheryl L.

    2006-07-01

    The Pressurized Water Reactor Owners Group (formerly the Westinghouse Owners Group (WOG)) methodology for extending the inservice inspection interval for welds in pressurized water reactor (PWR) reactor pressure vessel (RPV) was introduced as ICONE12-49429. The paper presented a risk informed basis for extending the interval between inspections from the current interval of 10 years to 20 years. In the paper presented at ICONE-12, results of pilot studies on typical Westinghouse and Combustion Engineering Nuclear Steam Supply System (NSSS) designs of PWR vessels showed that the change in risk associated with the proposed inspection interval extension was within the guidelines specified in the United States Nuclear Regulatory Commission (NRC) Regulatory Guide 1.174 for an acceptably small change in risk. Since the methodology was originally presented, the evaluation has been updated to incorporate the latest changes in the NRC Pressurized Thermal Shock (PTS) Risk Reevaluation Program and expanded to include the Babcock and Wilcox NSSS RPV design. The results of these evaluations demonstrate that the proposed RPV inspection interval extension remains a viable option for the industry. The updates to the methodology and input, pilot plant evaluations, results, process for demonstrating applicability of the pilot plant analysis to non-pilot lead plants and lessons learned from the evaluations performed are summarized in this paper. (authors)

  14. Final evaluation report for Westinghouse Hanford Company, WRAP-1,208 liter waste drum, docket 94-35-7A, type A packaging

    SciTech Connect (OSTI)

    Kelly, D.L., Westinghouse Hanford

    1996-06-12

    This report documents the U.S. Department of Transportation Specification 7A Type A (DOT-7A) compliance test results of the Westinghouse Hanford Company, Waste Receiving and Processing Facility, Module 1 (WRAP-1) Drum. The WRAP-1 Drum was tested for DOE-HQ in August 1994, by Los Alamos National Laboratory, under docket number 94-35-7A. Additionally, comparison and evaluation of the approved, as-tested packaging configuration was performed by WHC in September 1995. The WRAP-1 Drum was evaluated against the performance of the DOT-17C, 208 1 (55-gal) steel drums tested and evaluated under dockets 89-13-7A/90-18-7A and 94-37-7A.

  15. Pressure sensor

    SciTech Connect (OSTI)

    Mee, David K.; Ripley, Edward B.; Nienstedt, Zachary C.; Nienstedt, Alex W.; Howell, Jr., Layton N.

    2015-09-29

    Disclosed is a passive, in-situ pressure sensor. The sensor includes a sensing element having a ferromagnetic metal and a tension inducing mechanism coupled to the ferromagnetic metal. The tension inducing mechanism is operable to change a tensile stress upon the ferromagnetic metal based on a change in pressure in the sensing element. Changes in pressure are detected based on changes in the magnetic switching characteristics of the ferromagnetic metal when subjected to an alternating magnetic field caused by the change in the tensile stress. The sensing element is embeddable in a closed system for detecting pressure changes without the need for any penetrations of the system for power or data acquisition by detecting changes in the magnetic switching characteristics of the ferromagnetic metal caused by the tensile stress.

  16. Pressure regulator

    DOE Patents [OSTI]

    Ebeling, Jr., Robert W.; Weaver, Robert B.

    1979-01-01

    The pressure within a pressurized flow reactor operated under harsh environmental conditions is controlled by establishing and maintaining a fluidized bed of uniformly sized granular material of selected density by passing the gas from the reactor upwardly therethrough at a rate sufficient to fluidize the bed and varying the height of the bed by adding granular material thereto or removing granular material therefrom to adjust the backpressure on the flow reactor.

  17. PRESSURE TRANSDUCER

    DOE Patents [OSTI]

    Sander, H.H.

    1959-10-01

    A pressure or mechanical force transducer particularly adaptable to miniature telemetering systems is described. Basically the device consists of a transistor located within a magnetic field adapted to change in response to mechanical force. The conduction characteristics of the transistor in turn vary proportionally with changes in the magnetic flux across the transistor such that the output (either frequency of amplitude) of the transistor circuit is proportional to mechanical force or pressure.

  18. Development of second-generation pressurized fluidized bed combustion process

    SciTech Connect (OSTI)

    Wolowodiuk, W.; Robertson, A.; Bonk, D.

    1995-12-01

    Under the sponsorship of the United States Department of Energy, Foster Wheeler Development Corporation, and its team members, Westinghouse, Gilbert/Commonwealth, and the Institute of Gas Technology are developing second-generation pressurized fluidized bed combustion technology capable of achieving net plant efficiency in excess of 45 percent based on the higher heating value of the coal. A three-phase program entails design and costing of a 500 MWe power plant and identification of developments needed to commercialize this technology (Phase 1), testing of individual components (Phase 2), and finally testing these components in an integrated mode (Phase 3). This paper briefly describes the results of the first two phases as well as the progress on the third phase. Since other projects which use the same technology are in construction or in negotiation stages-namely, the Power System Development Facility and the Four Rivers Energy Modernization Projects-brief descriptions of these are also included.

  19. Development of second-generation pressurized fluidized bed combustion process

    SciTech Connect (OSTI)

    Wolowodiuk, W.; Robertson, A.; Bonk, D.

    1994-10-01

    Under the sponsorship of the United States Department of Energy, Foster Wheeler Development Corporation, and its team members, Westinghouse, Gilbert/Commonwealth, and the Institute of Gas Technology are developing second-generation pressurized fluidized bed combustion technology capable of achieving net plant efficiency in excess of 45 percent based on the higher heating value of the coal. A three-phase program entails design and costing of a 500 MWe power plant and identification of developments needed to commercialize this technology (Phase 1), testing of individual components (Phase 2), and finally testing these components in an integrated mode (Phase 3). This paper briefly describes the results of the first two phases as well as the progress on the third phase. Since other projects which use the same technology are in construction or in negotiation stages -- namely, the Power System Development Facility and the Four Rivers Energy Modernization Projects -- brief descriptions of these are also included.

  20. Wet processing of palladium for use in the tritium facility at Westinghouse, Savannah River, SC. Preparation of palladium using the Mound Muddy Water process

    SciTech Connect (OSTI)

    Baldwin, D.P.; Zamzow, D.S.

    1998-11-10

    Palladium used at Savannah River for tritium storage is currently obtained from a commercial source. In order to better understand the processes involved in preparing this material, Savannah River is supporting investigations into the chemical reactions used to synthesize this material and into the conditions necessary to produce palladium powder that meets their specifications. This better understanding may help to guarantee a continued reliable source for this material in the future. As part of this evaluation, a work-for-others contract between Westinghouse Savannah River Company and the Ames Laboratory Metallurgy and Ceramics Program was initiated. During FY98, the process for producing palladium powder developed in 1986 by Dan Grove of Mound Applied Technologies (USDOE) was studied to understand the processing conditions that lead to changes in morphology in the final product. This report details the results of this study of the Mound Muddy Water process, along with the results of a round-robin analysis of well-characterized palladium samples that was performed by Savannah River and Ames Laboratory. The Mound Muddy Water process is comprised of three basic wet chemical processes, palladium dissolution, neutralization, and precipitation, with a number of filtration steps to remove unwanted impurity precipitates.

  1. Westinghouse Savannah River Company: Report from the DOE Voluntary Protection Program onsite reviews, February 24--March 7, 1997, and June 15--19, 1998

    SciTech Connect (OSTI)

    1999-05-01

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Initial and Update Review Teams` findings from the onsite evaluations of the Westinghouse Savannah River Site (SRS), conducted February 24--March 7, 1997, and June 15-19, 1998. The site was evaluated against the program requirements contained in US Department of Energy Voluntary Protection Program, Part 1: Program Elements to determine its success in implementing the five tenets of DOE-VPP. The Initial Review Team concluded that WSRC met or surpassed all DOE-VPP requirements, with the exception of 12 minor findings and 5 recommendations. WSRC was asked to resolve the findings within 90 days. During a follow-up visit in January 1996, representatives of the Team verified that all 90-day actions were completed. The Update Team detected though that the program did not demonstrate thorough and meaningful employee involvement. The ability to attain and sustain VPP-level performance on employee involvement is a significant challenge. Large companies with multiple layers of management and geographically disperse personnel have particular difficulty.

  2. Pressure transducer

    DOE Patents [OSTI]

    Anderson, T.T.; Roop, C.J.; Schmidt, K.J.; Gunchin, E.R.

    1987-02-13

    A pressure transducer suitable for use in high temperature environments includes two pairs of induction coils, each pair being bifilarly wound together, and each pair of coils connected as opposite arms of a four arm circuit; an electrically conductive target moveably positioned between the coil pairs and connected to a diaphragm such that deflection of the diaphragm causes axial movement of the target and an unbalance in the bridge output. 7 figs.

  3. Pressure transducer

    DOE Patents [OSTI]

    Anderson, Thomas T.; Roop, Conard J.; Schmidt, Kenneth J.; Gunchin, Elmer R.

    1989-01-01

    A pressure transducer suitable for use in high temperature environments includes two pairs of induction coils, each pair being bifilarly wound together, and each pair of coils connected as opposite arms of a four arm circuit; an electrically conductive target moveably positioned between the coil pairs and connected to a diaphragm such that deflection of the diaphragm causes axial movement of the target and an unbalance in the bridge output.

  4. Westinghouse Accident Tolerant Fuel Program

    SciTech Connect (OSTI)

    Xu, Peng

    2013-08-21

    The PowerPoint presentation includes a timeline for the program implementation, the technical approach taken, a summary of testing results, a status of task 2, what has been done to share the results so far, and a summary of upcoming work.

  5. Westinghouse ICF power plant study

    SciTech Connect (OSTI)

    Sucov, E. W.

    1980-10-01

    In this study, two different electric power plants for the production of about 1000 MWe which were based on a CO/sub 2/ laser driver and on a heavy ion driver have been developed and analyzed. The purposes of this study were: (1) to examine in a self consistent way the technological and institutional problems that need to be confronted and solved in order to produce commercially competitive electricity in the 2020 time frame from an inertial fusion reactor, and (2) to compare, on a common basis, the consequences of using two different drivers to initiate the DT fuel pellet explosions. Analytic descriptions of size/performance/cost relationships for each of the subsystems comprising the power plant have been combined into an overall computer code which models the entire plant. This overall model has been used to conduct trade studies which examine the consequences of varying critical design values around the reference point.

  6. FERRET-SAND II physics-dosimetry analysis for N Reactor Pressure Tubes 2954, 3053 and 1165 using a WIMS calculated input spectrum

    SciTech Connect (OSTI)

    McElroy, W.N.; Kellogg, L.S.; Matsumoto, W.Y.; Morgan, W.C.; Suski, A.E.

    1988-05-01

    This report is in response to a request from Westinghouse Hanford Company (WHC) that the PNL National Dosimetry Center (NDC) perform physics-dosimetry analyses (E > MeV) for N Reactor Pressure Tubes 2954 and 3053. As a result of these analyses, and recommendations for additional studies, two physics-dosimetry re-evaluations for Pressure Tube 1165 were also accomplished. The primary objective of Pacific Northwest Laboratories' (PNL) National Dosimetry Center (NDC) physics-dosimetry work for N Reactor was to provide FERRET-SAND II physics-dosimetry results to assist in the assessment of neutron radiation-induced changes in the physical and mechanical properties of N Reactor pressure tubes. 15 refs., 6 figs., 5 tabs.

  7. Furnace Pressure Controllers

    Broader source: Energy.gov [DOE]

    This tip sheet highlights the benefits of precise furnace pressure control in process heating systems.

  8. High Performance Fuel Desing for Next Generation Pressurized Water Reactors

    SciTech Connect (OSTI)

    Mujid S. Kazimi; Pavel Hejzlar

    2006-01-31

    The use of internally and externally cooled annular fule rods for high power density Pressurized Water Reactors is assessed. The assessment included steady state and transient thermal conditions, neutronic and fuel management requirements, mechanical vibration issues, fuel performance issues, fuel fabrication methods and econmic assessment. The investigation was donducted by a team from MIT, Westinghouse, Gamma Engineering, Framatome ANP, and AECL. The analyses led to the conclusion that raising the power density by 50% may be possible with this advanced fuel. Even at the 150% power level, the fuel temperature would be a few hundred degrees lower than the current fuel temperatre. Significant economic and safety advantages can be obtained by using this fuel in new reactors. Switching to this type of fuel for existing reactors would yield safety advantages, but the economic return is dependent on the duration of plant shutdown to accommodate higher power production. The main feasiblity issue for the high power performance appears to be the potential for uneven splitting of heat flux between the inner and outer fuel surfaces due to premature closure of the outer fuel-cladding gap. This could be overcome by using a very narrow gap for the inner fuel surface and/or the spraying of a crushable zirconium oxide film at the fuel pellet outer surface. An alternative fuel manufacturing approach using vobropacking was also investigated but appears to yield lower than desirable fuel density.

  9. Pressure surge attenuator

    DOE Patents [OSTI]

    Christie, Alan M.; Snyder, Kurt I.

    1985-01-01

    A pressure surge attenuation system for pipes having a fluted region opposite crushable metal foam. As adapted for nuclear reactor vessels and heads, crushable metal foam is disposed to attenuate pressure surges.

  10. Pressure-sensitive optrode

    DOE Patents [OSTI]

    Hirschfeld, T.B.

    1986-07-15

    An apparatus is provided for sensing changes in pressure and for generating optical signals related to said changes in pressure. Light from a fiber optic illuminates a fluorescent composition causing it to fluoresce. The fluorescent composition is caused to fluoresce more relative to the end of the fiber optic in response to changes in pressure so that the intensity of fluorescent emissions collected by the same fiber optic used for illumination varies monotonically with pressure. 10 figs.

  11. PRESSURE SYSTEM CONTROL

    DOE Patents [OSTI]

    Esselman, W.H.; Kaplan, G.M.

    1961-06-20

    The control of pressure in pressurized liquid systems, especially a pressurized liquid reactor system, may be achieved by providing a bias circuit or loop across a closed loop having a flow restriction means in the form of an orifice, a storage tank, and a pump connected in series. The subject invention is advantageously utilized where control of a reactor can be achieved by response to the temperature and pressure of the primary cooling system.

  12. Triviality and vacuum stability bounds in the three-loop neutrino...

    Office of Scientific and Technical Information (OSTI)

    FIELD THEORIES; LEPTONS; MASSLESS PARTICLES; MATHEMATICAL MODELS; MATTER; NUCLEAR POTENTIAL; PARTICLE MODELS; PARTICLE PROPERTIES; POTENTIALS; QUANTUM FIELD THEORY; QUARK MODEL; ...

  13. High pressure operation of tubular solid oxide fuel cells and their intergration with gas turbines

    SciTech Connect (OSTI)

    Haynes, C.; Wepfer, W.J.

    1996-12-31

    Fossil fuels continue to be used at a rate greater than that of their natural formation, and the current byproducts from their use are believed to have a detrimental effect on the environment (e.g. global warming). There is thus a significant impetus to have cleaner, more efficient fuel consumption alternatives. Recent progress has led to renewed vigor in the development of fuel cell technology, which has been shown to be capable of producing high efficiencies with relatively benign exhaust products. The tubular solid oxide fuel cell developed by Westinghouse Electric Corporation has shown significant promise. Modeling efforts have been and are underway to optimize and better understand this fuel cell technology. Thus far, the bulk of modeling efforts has been for operation at atmospheric pressure. There is now interest in developing high-efficiency integrated gas turbine/solid oxide fuel cell systems. Such operation of fuel cells would obviously occur at higher pressures. The fuel cells have been successfully modeled under high pressure operation and further investigated as integrated components of an open loop gas turbine cycle.

  14. Pressure reducing regulator

    DOE Patents [OSTI]

    Whitehead, John C. (Davis, CA); Dilgard, Lemoyne W. (Willits, CA)

    1995-01-01

    A pressure reducing regulator that controls its downstream or outlet pressure to a fixed fraction of its upstream or inlet pressure. The regulator includes a housing which may be of a titanium alloy, within which is located a seal or gasket at the outlet end which may be made of annealed copper, a rod, and piston, each of which may be made of high density graphite. The regulator is insensitive to temperature by virtue of being without a spring or gas sealed behind a diaphragm, and provides a reference for a system in which it is being used. The rod and piston of the regulator are constructed, for example, to have a 1/20 ratio such that when the downstream pressure is less than 1/20 of the upstream pressure the regulator opens and when the downstream pressure exceeds 1/20 of the upstream pressure the regulator closes.

  15. Pressure reducing regulator

    DOE Patents [OSTI]

    Whitehead, J.C.; Dilgard, L.W.

    1995-10-10

    A pressure reducing regulator that controls its downstream or outlet pressure to a fixed fraction of its upstream or inlet pressure is disclosed. The regulator includes a housing which may be of a titanium alloy, within which is located a seal or gasket at the outlet end which may be made of annealed copper, a rod, and piston, each of which may be made of high density graphite. The regulator is insensitive to temperature by virtue of being without a spring or gas sealed behind a diaphragm, and provides a reference for a system in which it is being used. The rod and piston of the regulator are constructed, for example, to have a 1/20 ratio such that when the downstream pressure is less than 1/20 of the upstream pressure the regulator opens and when the downstream pressure exceeds 1/20 of the upstream pressure the regulator closes. 10 figs.

  16. Miniaturized pressurization system

    DOE Patents [OSTI]

    Whitehead, John C. (Davis, CA); Swink, Don G. (Woodinville, WA)

    1991-01-01

    The invention uses a fluid stored at a low pressure and provides the fluid at a high pressure. The invention allows the low pressure fluid to flow to a fluid bore of a differential pump and from the pump to a fluid pressure regulator. After flowing through the regulator the fluid is converted to a gas which is directed to a gas bore of the differential pump. By controlling the flow of gas entering and being exhausted from the gas bore, the invention provides pressure to the fluid. By setting the regulator, the high pressure fluid can be set at predetermined values. Because the invention only needs a low pressure fluid, the inventive apparatus has a low mass, and therefore would be useful in rocket propulsion systems.

  17. Pressure cryocooling protein crystals

    DOE Patents [OSTI]

    Kim, Chae Un; Gruner, Sol M.

    2011-10-04

    Preparation of cryocooled protein crystal is provided by use of helium pressurizing and cryocooling to obtain cryocooled protein crystal allowing collection of high resolution data and by heavier noble gas (krypton or xenon) binding followed by helium pressurizing and cryocooling to obtain cryocooled protein crystal for collection of high resolution data and SAD phasing simultaneously. The helium pressurizing is carried out on crystal coated to prevent dehydration or on crystal grown in aqueous solution in a capillary.

  18. High temperature pressure gauge

    DOE Patents [OSTI]

    Echtler, J. Paul; Scandrol, Roy O.

    1981-01-01

    A high temperature pressure gauge comprising a pressure gauge positioned in fluid communication with one end of a conduit which has a diaphragm mounted in its other end. The conduit is filled with a low melting metal alloy above the diaphragm for a portion of its length with a high temperature fluid being positioned in the remaining length of the conduit and in the pressure gauge.

  19. Bag pressure monitor

    DOE Patents [OSTI]

    Vaughn, Mark Roy; Miller, Alva Keith

    2000-01-01

    An inexpensive mechanical indicator for measuring low pressure in an inflating bag includes a pair of sides connected to each other at one edge and pivotally connected at spaced parallel locations on the bag. A spring biases the sides towards each other in opposition to tension in the inflating bag. The distance between the sides is indicative of the pressure in the bag. The device is accurate at pressures below 0.05 psi.

  20. Pressure-sensitive optrode

    DOE Patents [OSTI]

    Hirschfeld, Tomas B. (Livermore, CA)

    1985-01-01

    Apparatus and method for sensing changes in pressure and for generating optical signals related to changes in pressure. Light from a fiber optic is directed to a movable surface which is coated with a light-responsive material, and which moves relative to the end of the fiber optic in response to changes in pressure. The same fiber optic collects a portion of the reflected or emitted light from the movable surface. Changes in pressure are determined by measuring changes in the amount of light collected.

  1. Pressurized fluidized bed reactor

    DOE Patents [OSTI]

    Isaksson, Juhani

    1996-01-01

    A pressurized fluid bed reactor power plant includes a fluidized bed reactor contained within a pressure vessel with a pressurized gas volume between the reactor and the vessel. A first conduit supplies primary gas from the gas volume to the reactor, passing outside the pressure vessel and then returning through the pressure vessel to the reactor, and pressurized gas is supplied from a compressor through a second conduit to the gas volume. A third conduit, comprising a hot gas discharge, carries gases from the reactor, through a filter, and ultimately to a turbine. During normal operation of the plant, pressurized gas is withdrawn from the gas volume through the first conduit and introduced into the reactor at a substantially continuously controlled rate as the primary gas to the reactor. In response to an operational disturbance of the plant, the flow of gas in the first, second, and third conduits is terminated, and thereafter the pressure in the gas volume and in the reactor is substantially simultaneously reduced by opening pressure relief valves in the first and third conduits, and optionally by passing air directly from the second conduit to the turbine.

  2. Sapphire tube pressure vessel

    DOE Patents [OSTI]

    Outwater, John O. (Cambridge, MA)

    2000-01-01

    A pressure vessel is provided for observing corrosive fluids at high temperatures and pressures. A transparent Teflon bag contains the corrosive fluid and provides an inert barrier. The Teflon bag is placed within a sapphire tube, which forms a pressure boundary. The tube is received within a pipe including a viewing window. The combination of the Teflon bag, sapphire tube and pipe provides a strong and inert pressure vessel. In an alternative embodiment, tie rods connect together compression fittings at opposite ends of the sapphire tube.

  3. Pressure-sensitive optrode

    DOE Patents [OSTI]

    Hirschfeld, T.B.

    1985-04-09

    An apparatus and method are disclosed for sensing changes in pressure and for generating optical signals related to changes in pressure. Light from a fiber optic is directed to a movable surface which is coated with a light-responsive material, and which moves relative to the end of the fiber optic in response to changes in pressure. The same fiber optic collects a portion of the reflected or emitted light from the movable surface. Changes in pressure are determined by measuring changes in the amount of light collected. 5 figs.

  4. Pressurized Combustion and Gasification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... However, properly designing new pressurized combustion burners and boilers requires accurate data on coal devolatilization and combustion rates under these conditions. Similarly, ...

  5. Pressurized fluidized bed reactor

    DOE Patents [OSTI]

    Isaksson, J.

    1996-03-19

    A pressurized fluid bed reactor power plant includes a fluidized bed reactor contained within a pressure vessel with a pressurized gas volume between the reactor and the vessel. A first conduit supplies primary gas from the gas volume to the reactor, passing outside the pressure vessel and then returning through the pressure vessel to the reactor, and pressurized gas is supplied from a compressor through a second conduit to the gas volume. A third conduit, comprising a hot gas discharge, carries gases from the reactor, through a filter, and ultimately to a turbine. During normal operation of the plant, pressurized gas is withdrawn from the gas volume through the first conduit and introduced into the reactor at a substantially continuously controlled rate as the primary gas to the reactor. In response to an operational disturbance of the plant, the flow of gas in the first, second, and third conduits is terminated, and thereafter the pressure in the gas volume and in the reactor is substantially simultaneously reduced by opening pressure relief valves in the first and third conduits, and optionally by passing air directly from the second conduit to the turbine. 1 fig.

  6. 6151 Pressure Systems

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For design, fabrication, testing, repair, modification and inspection are based on the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section ...

  7. Dual shell pressure balanced vessel

    DOE Patents [OSTI]

    Fassbender, Alexander G.

    1992-01-01

    A dual-wall pressure balanced vessel for processing high viscosity slurries at high temperatures and pressures having an outer pressure vessel and an inner vessel with an annular space between the vessels pressurized at a pressure slightly less than or equivalent to the pressure within the inner vessel.

  8. Project Quality Assurance Plan for research and development services provided by Oak Ridge National Laboratory in support of the Westinghouse Materials Company of Ohio Operable Unit 1 Stabilization Development and Treatability Studies Program

    SciTech Connect (OSTI)

    Gilliam, T.M.

    1991-05-01

    This Project Quality Assurance Plan (PQAP) sets forth the quality assurance (QA) requirements that are applied to those elements of the Westinghouse Materials Company of Ohio (WMCO) Operable Unit 1 support at Oak Ridge National Laboratory (ORNL) project that involve research and development (R D) performed at ORNL. This is in compliance with the applicable criteria of 10 CFR Part 50, Appendix B, ANSI/ASME NQA-1, as specified by Department of Energy (DOE) Oak Ridge Operations (ORO) Order 5700.6B. For this application, NQA-1 is the core QA Program requirements document. QA policy, normally found in the requirements document, is contained herein. The requirements of this PQAP apply to project activities that affect the quality and reliability/credibility of research, development, and investigative data and documentation. These activities include the functions of attaining quality objectives and assuring that an appropriate QA program scope is established. The scope of activities affecting quality includes organization; personnel training and qualifications; design control; procurement; material handling and storage; operating procedures; testing, surveillance, and auditing; R D investigative activities and documentation; deficiencies; corrective actions; and QA record keeping. 12 figs.

  9. Use of InSpector{sup TM} 1 1000 Instrument with LaBr{sub 3} for Nuclear Criticality Safety (NCS) Applications at the Westinghouse Hematite Decommissioning Project (HDP) - 13132

    SciTech Connect (OSTI)

    Pritchard, Megan; Guido, Joe

    2013-07-01

    The Westinghouse Hematite Decommissioning Project (HDP) is a former nuclear fuel cycle facility that is currently undergoing decommissioning. One aspect of the decommissioning scope is remediation of buried nuclear waste in unlined burial pits. The current Nuclear Criticality Safety program relies on application of criticality controls based on radiological setpoints from a 2 x 2 Sodium Iodide (NaI) detector. Because of the nature of the material buried (Low Enriched Uranium (LEU), depleted uranium, thorium, and radium) and the stringent threshold for application of criticality controls based on waste management (0.1 g {sup 235}U/L), a better method for {sup 235}U identification and quantification has been developed. This paper outlines the early stages of a quick, in-field nuclear material assay and {sup 235}U mass estimation process currently being deployed at HDP. Nuclear material initially classified such that NCS controls are necessary can be demonstrated not to require such controls and dispositioned as desired by project operations. Using Monte Carlo techniques and a high resolution Lanthanum Bromide (LaBr) detector with portable Multi-Channel Analyzer (MCA), a bounding {sup 235}U mass is assigned to basic geometries of nuclear material as it is excavated. The deployment of these methods and techniques has saved large amounts of time and money in the nuclear material remediation process. (authors)

  10. Pressurizer tank upper support

    DOE Patents [OSTI]

    Baker, Tod H.; Ott, Howard L.

    1994-01-01

    A pressurizer tank in a pressurized water nuclear reactor is mounted between structural walls of the reactor on a substructure of the reactor, the tank extending upwardly from the substructure. For bearing lateral loads such as seismic shocks, a girder substantially encircles the pressurizer tank at a space above the substructure and is coupled to the structural walls via opposed sway struts. Each sway strut is attached at one end to the girder and at an opposite end to one of the structural walls, and the sway struts are oriented substantially horizontally in pairs aligned substantially along tangents to the wall of the circular tank. Preferably, eight sway struts attach to the girder at 90.degree. intervals. A compartment encloses the pressurizer tank and forms the structural wall. The sway struts attach to corners of the compartment for maximum stiffness and load bearing capacity. A valve support frame carrying the relief/discharge piping and valves of an automatic depressurization arrangement is fixed to the girder, whereby lateral loads on the relief/discharge piping are coupled directly to the compartment rather than through any portion of the pressurizer tank. Thermal insulation for the valve support frame prevents thermal loading of the piping and valves. The girder is shimmed to define a gap for reducing thermal transfer, and the girder is free to move vertically relative to the compartment walls, for accommodating dimensional variation of the pressurizer tank with changes in temperature and pressure.

  11. Pressurizer tank upper support

    DOE Patents [OSTI]

    Baker, T.H.; Ott, H.L.

    1994-01-11

    A pressurizer tank in a pressurized water nuclear reactor is mounted between structural walls of the reactor on a substructure of the reactor, the tank extending upwardly from the substructure. For bearing lateral loads such as seismic shocks, a girder substantially encircles the pressurizer tank at a space above the substructure and is coupled to the structural walls via opposed sway struts. Each sway strut is attached at one end to the girder and at an opposite end to one of the structural walls, and the sway struts are oriented substantially horizontally in pairs aligned substantially along tangents to the wall of the circular tank. Preferably, eight sway struts attach to the girder at 90[degree] intervals. A compartment encloses the pressurizer tank and forms the structural wall. The sway struts attach to corners of the compartment for maximum stiffness and load bearing capacity. A valve support frame carrying the relief/discharge piping and valves of an automatic depressurization arrangement is fixed to the girder, whereby lateral loads on the relief/discharge piping are coupled directly to the compartment rather than through any portion of the pressurizer tank. Thermal insulation for the valve support frame prevents thermal loading of the piping and valves. The girder is shimmed to define a gap for reducing thermal transfer, and the girder is free to move vertically relative to the compartment walls, for accommodating dimensional variation of the pressurizer tank with changes in temperature and pressure. 10 figures.

  12. Capacitance pressure sensor

    DOE Patents [OSTI]

    Eaton, William P.; Staple, Bevan D.; Smith, James H.

    2000-01-01

    A microelectromechanical (MEM) capacitance pressure sensor integrated with electronic circuitry on a common substrate and a method for forming such a device are disclosed. The MEM capacitance pressure sensor includes a capacitance pressure sensor formed at least partially in a cavity etched below the surface of a silicon substrate and adjacent circuitry (CMOS, BiCMOS, or bipolar circuitry) formed on the substrate. By forming the capacitance pressure sensor in the cavity, the substrate can be planarized (e.g. by chemical-mechanical polishing) so that a standard set of integrated circuit processing steps can be used to form the electronic circuitry (e.g. using an aluminum or aluminum-alloy interconnect metallization).

  13. Radial pressure flange seal

    DOE Patents [OSTI]

    Batzer, T.H.; Call, W.R.

    1989-01-24

    This invention provides an all metal seal for vacuum or pressure vessels or systems. This invention does not use gaskets. The invention uses a flange which fits into a matching groove. Fluid pressure is applied in a chamber in the flange causing at least one of the flange walls to radially press against a side of the groove creating the seal between the flange wall and the groove side. 5 figs.

  14. Radial pressure flange seal

    DOE Patents [OSTI]

    Batzer, Thomas H.; Call, Wayne R.

    1989-01-01

    This invention provides an all metal seal for vacuum or pressure vessels or systems. This invention does not use gaskets. The invention uses a flange which fits into a matching groove. Fluid pressure is applied in a chamber in the flange causing at least one of the flange walls to radially press against a side of the groove creating the seal between the flange wall and the groove side.

  15. Pressure multiplying dispenser

    DOE Patents [OSTI]

    DeFord, Henry S.; Moss, Owen R.

    1986-01-01

    A pressure multiplying dispenser for delivering fluid, preferably as a spray to the atmosphere, from a source of fluid, preferably a spray bottle, is described. The dispenser includes in combination a hollow cylindrical member, a nozzle delivery tube within the cylindrical member and a hollow actuator piston slideable within the cylindrical member which acts to multiply the pressure of a squeeze applied to the spray bottle.

  16. Passive blast pressure sensor

    DOE Patents [OSTI]

    King, Michael J.; Sanchez, Roberto J.; Moss, William C.

    2013-03-19

    A passive blast pressure sensor for detecting blast overpressures of at least a predetermined minimum threshold pressure. The blast pressure sensor includes a piston-cylinder arrangement with one end of the piston having a detection surface exposed to a blast event monitored medium through one end of the cylinder and the other end of the piston having a striker surface positioned to impact a contact stress sensitive film that is positioned against a strike surface of a rigid body, such as a backing plate. The contact stress sensitive film is of a type which changes color in response to at least a predetermined minimum contact stress which is defined as a product of the predetermined minimum threshold pressure and an amplification factor of the piston. In this manner, a color change in the film arising from impact of the piston accelerated by a blast event provides visual indication that a blast overpressure encountered from the blast event was not less than the predetermined minimum threshold pressure.

  17. ARM - Lesson Plans: Air Pressure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Teachers' Toolbox Lesson Plans Lesson Plans: Air Pressure Objective The objective of this ... Important Points to Understand Air has weight and exerts pressure on everything with which ...

  18. SPES-2, AP600 intergral system test S01007 2 inch CL to core make-up tank pressure balance line break

    SciTech Connect (OSTI)

    Bacchiani, M.; Medich, C.; Rigamonti, M.

    1995-09-01

    The SPES-2 is a full height, full pressure experimental test facility reproducing the Westinghouse AP600 reactor with a scaling factor of 1/395. The experimental plant, designed and operated by SIET in Piacenza, consists of a full simulation of the AP600 primary core cooling system including all the passive and active safety systems. In 1992, Westinghouse, in cooperation with ENEL (Ente Nazionale per l` Energia Elettrica), ENEA (Enter per le numove Technlogie, l` Energia e l` Ambient), Siet (Societa Informazioni Esperienze Termoidraulich) and ANSALDO developed an experimental program to test the integrated behaviour of the AP600 passive safety systems. The SPES-2 test matrix, concluded in November 1994, has examined the AP600 passive safety system response for a range of small break LOCAs at different locations on the primary system and on the passive system lines; single steam generator tube ruptures with passive and active safety systems and a main steam line break transient to demonstrate the boration capability of passive safety systems for rapid cooldown. Each of the tests has provided detailed experimental results for verification of the capability of the analysis methods to predict the integrated passive safety system behaviour. Cold and hot shakedown tests have been performed on the facility to check the characteristics of the plant before starting the experimental campaign. The paper first presents a description of the SPES-2 test facility then the main results of S01007 test {open_quotes}2{close_quotes} Cold Leg (CL) to Core Make-up Tank (CMT) pressure balance line break{close_quotes} are reported and compared with predictions performed using RELAP5/mod3/80 obtained by ANSALDO through agreement with U.S.N.R.C. (U.S. Nuclear Regulatory Commission). The SPES-2 nodalization and all the calculations here presented were performed by ANSALDO and sponsored by ENEL as a part of pre-test predictions for SPES-2.

  19. Oxygen partial pressure sensor

    DOE Patents [OSTI]

    Dees, Dennis W.

    1994-01-01

    A method for detecting oxygen partial pressure and an oxygen partial pressure sensor are provided. The method for measuring oxygen partial pressure includes contacting oxygen to a solid oxide electrolyte and measuring the subsequent change in electrical conductivity of the solid oxide electrolyte. A solid oxide electrolyte is utilized that contacts both a porous electrode and a nonporous electrode. The electrical conductivity of the solid oxide electrolyte is affected when oxygen from an exhaust stream permeates through the porous electrode to establish an equilibrium of oxygen anions in the electrolyte, thereby displacing electrons throughout the electrolyte to form an electron gradient. By adapting the two electrodes to sense a voltage potential between them, the change in electrolyte conductivity due to oxygen presence can be measured.

  20. Oxygen partial pressure sensor

    DOE Patents [OSTI]

    Dees, D.W.

    1994-09-06

    A method for detecting oxygen partial pressure and an oxygen partial pressure sensor are provided. The method for measuring oxygen partial pressure includes contacting oxygen to a solid oxide electrolyte and measuring the subsequent change in electrical conductivity of the solid oxide electrolyte. A solid oxide electrolyte is utilized that contacts both a porous electrode and a nonporous electrode. The electrical conductivity of the solid oxide electrolyte is affected when oxygen from an exhaust stream permeates through the porous electrode to establish an equilibrium of oxygen anions in the electrolyte, thereby displacing electrons throughout the electrolyte to form an electron gradient. By adapting the two electrodes to sense a voltage potential between them, the change in electrolyte conductivity due to oxygen presence can be measured. 1 fig.

  1. HIGH PRESSURE GAS REGULATOR

    DOE Patents [OSTI]

    Ramage, R.W.

    1962-05-01

    A gas regulator operating on the piston and feedback principle is described. The device is particularly suitable for the delicate regulation of high pressure, i.e., 10,000 psi and above, gas sources, as well as being perfectly adaptable for use on gas supplies as low as 50 psi. The piston is adjustably connected to a needle valve and the movement of the piston regulates the flow of gas from the needle valve. The gas output is obtained from the needle valve. Output pressure is sampled by a piston feedback means which, in turn, regulates the movement of the main piston. When the output is other than the desired value, the feedback system initiates movement of the main piston to allow the output pressure to be corrected or to remain constant. (AEC)

  2. PRESSURE SENSING DEVICE

    DOE Patents [OSTI]

    Pope, K.E.

    1959-12-15

    This device is primarily useful as a switch which is selectively operable to actuate in response to either absolute or differential predetermined pressures. The device generally comprises a pressure-tight housing divided by a movable impermeable diaphragm into two chambers, a reference pressure chamber and a bulb chamber containing the switching means and otherwise filled with an incompressible non-conducting fluid. The switch means comprises a normally collapsed bulb having an electrically conductive outer surface and a vent tube leading to the housing exterior. The normally collapsed bulb is disposed such that upon its inflation, respensive to air inflow from the vent, two contacts fixed within the bulb chamber are adapted to be electrically shorted by the conducting outer surface of the bulb.

  3. Pressure suppression containment system

    DOE Patents [OSTI]

    Gluntz, Douglas M.; Townsend, Harold E.

    1994-03-15

    A pressure suppression containment system includes a containment vessel surrounding a reactor pressure vessel and defining a drywell therein containing a non-condensable gas. An enclosed wetwell pool is disposed inside the containment vessel, and a gravity driven cooling system (GDCS) pool is disposed above the wetwell pool in the containment vessel. The wetwell pool includes a plenum for receiving the non-condensable gas carried with steam from the drywell following a loss-of coolant-accident (LOCA). The wetwell plenum is vented to a plenum above the GDCS pool following the LOCA for suppressing pressure rise within the containment vessel. A method of operation includes channeling steam released into the drywell following the LOCA into the wetwell pool for cooling along with the non-condensable gas carried therewith. The GDCS pool is then drained by gravity, and the wetwell plenum is vented into the GDCS plenum for channeling the non-condensable gas thereto.

  4. Pressure suppression containment system

    DOE Patents [OSTI]

    Gluntz, D.M.; Townsend, H.E.

    1994-03-15

    A pressure suppression containment system includes a containment vessel surrounding a reactor pressure vessel and defining a drywell therein containing a non-condensable gas. An enclosed wetwell pool is disposed inside the containment vessel, and a gravity driven cooling system (GDCS) pool is disposed above the wetwell pool in the containment vessel. The wetwell pool includes a plenum for receiving the non-condensable gas carried with steam from the drywell following a loss-of-coolant-accident (LOCA). The wetwell plenum is vented to a plenum above the GDCS pool following the LOCA for suppressing pressure rise within the containment vessel. A method of operation includes channeling steam released into the drywell following the LOCA into the wetwell pool for cooling along with the non-condensable gas carried therewith. The GDCS pool is then drained by gravity, and the wetwell plenum is vented into the GDCS plenum for channeling the non-condensable gas thereto. 6 figures.

  5. Wellbore pressure transducer

    DOE Patents [OSTI]

    Shuck, Lowell Z.

    1979-01-01

    Subterranean earth formations containing energy values are subjected to hydraulic fracturing procedures to enhance the recovery of the energy values. These fractures are induced in the earth formation by pumping liquid into the wellbore penetrating the earth formation until the pressure of the liquid is sufficient to fracture the earth formation adjacent to the wellbore. The present invention is directed to a transducer which is positionable within the wellbore to generate a signal indicative of the fracture initiation useful for providing a timing signal to equipment for seismic mapping of the fracture as it occurs and for providing a measurement of the pressure at which the fracture is initiated.

  6. Pressurized Combustion and Gasification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pressurized Combustion and Gasification - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management

  7. Reactor pressure vessel nozzle

    DOE Patents [OSTI]

    Challberg, R.C.; Upton, H.A.

    1994-10-04

    A nozzle for joining a pool of water to a nuclear reactor pressure vessel includes a tubular body having a proximal end joinable to the pressure vessel and a distal end joinable in flow communication with the pool. The body includes a flow passage therethrough having in serial flow communication a first port at the distal end, a throat spaced axially from the first port, a conical channel extending axially from the throat, and a second port at the proximal end which is joinable in flow communication with the pressure vessel. The inner diameter of the flow passage decreases from the first port to the throat and then increases along the conical channel to the second port. In this way, the conical channel acts as a diverging channel or diffuser in the forward flow direction from the first port to the second port for recovering pressure due to the flow restriction provided by the throat. In the backflow direction from the second port to the first port, the conical channel is a converging channel and with the abrupt increase in flow area from the throat to the first port collectively increase resistance to flow therethrough. 2 figs.

  8. Low pressure hydrocyclone separator

    SciTech Connect (OSTI)

    Flanigan, D.A.; Stolhand, J.E.

    1989-07-04

    This patent describes a method of separating a dispersed phase liquid from a bulk phase liquid of a liquid-liquid mixture, the dispersed phase and bulk phase liquids having different densities. The method comprises the steps of: providing a supply of the liquid-liquid mixture at a first pressure; providing a pump means including means for minimizing degradation of the volumetric means size of droplets of the dispersed phase further including a pump size for maintaining the pump means at substantially near maximum flow rate capacity; pumping the liquid-liquid mixture with at least one pump means to a second pressure such that a differential between the first and second pressures is not substantially greater than a differential pressure at which the pump means begins to substantially degrade the volumetric mean size of droplets of the dispersed phase liquid passing therethrough, the pumping without substantial droplet degradation being achieved by operating the pump means at relatively near its maximum flow rate capacity to substantially reduce on a percentage basis the effect of fluid slippage within the pump means; directing the liquid-liquid mixture from the pump means to a hydrocyclone; and separating a substantial portion of the dispersed phase liquid from the liquid-liquid mixture in the hydrocyclone.

  9. Reactor pressure vessel nozzle

    DOE Patents [OSTI]

    Challberg, Roy C.; Upton, Hubert A.

    1994-01-01

    A nozzle for joining a pool of water to a nuclear reactor pressure vessel includes a tubular body having a proximal end joinable to the pressure vessel and a distal end joinable in flow communication with the pool. The body includes a flow passage therethrough having in serial flow communication a first port at the distal end, a throat spaced axially from the first port, a conical channel extending axially from the throat, and a second port at the proximal end which is joinable in flow communication with the pressure vessel. The inner diameter of the flow passage decreases from the first port to the throat and then increases along the conical channel to the second port. In this way, the conical channel acts as a diverging channel or diffuser in the forward flow direction from the first port to the second port for recovering pressure due to the flow restriction provided by the throat. In the backflow direction from the second port to the first port, the conical channel is a converging channel and with the abrupt increase in flow area from the throat to the first port collectively increase resistance to flow therethrough.

  10. GOLD PRESSURE VESSEL SEAL

    DOE Patents [OSTI]

    Smith, A.E.

    1963-11-26

    An improved seal between the piston and die member of a piston-cylinder type pressure vessel is presented. A layer of gold, of sufficient thickness to provide an interference fit between the piston and die member, is plated on the contacting surface of at least one of the members. (AEC)

  11. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Achievable (ALARA) deficiencies that contributed to unplanned worker uptakes and the spread of contamination at DOE's Savannah River Site. PDF icon Preliminary Notice of...

  12. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intake between August 4, 1996, and February 10, 1997, by a Crane Operator at the Savannah River Site F-Canyon Preliminary Notice of Violation, EG&G Incorporated - EA-97-10...

  13. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - EA 98-09 Type B Accident Investigation Board Report of the Plutonium Intake between August 4, 1996, and February 10, 1997, by a Crane Operator at the Savannah River Site F-Canyon...

  14. Preliminary Notice of Violation, Westinghouse Hanford Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford Company for violations of 10 C.F.R. 835 associated with an unplanned extremity radiation exposure during removal of equipment from a radioactive storage tank at the...

  15. Westinghouse TRU Solutions LLC Announces Scholarship Awards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lea and Eddy counties. In Lea County, $1,000 scholarships were awarded to high school seniors Felix Gaytan, Jr., Eunice; Joshua Hill, Jal; Vidal Ramirez, Tatum; and Heather Maker, Lovington. Hobbs High School seniors Laura Smith and Robert Edwards shared honors, each receiving a $500 award. Scholarship funds were directly managed by school officials to target student needs. Funds could be used toward higher math or science education degrees, community college associate degrees, technical and

  16. PRELIMINARY SURVEY OF WESTINGHOUSE ELECTRIC CORPORATION EAST...

    Office of Legacy Management (LM)

    An industriallhygiene group surveyed the 'area and issued clearance at that time; however, there are no ' remaining records. Apparently, all historical records pertaining to the ...

  17. Westinghouse Advanced Reactors Division Plutonium Fuel Laboratories

    Office of Legacy Management (LM)

    ... Sodium-bonded fuel pins were fabricated under contract to the Atomic Energy C o m m ission ... 1983. Denero, J.V., R.A. Lange, M.L. Ray, J.L. Shoulders, and H.C. Woodsum Systems), ...

  18. Westinghouse Again Recognized For Safe Underground Operations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and operating contractor for DOE at WIPP. The company's underground operations include mining, hoisting, maintenance, engineering and other related activities. The Certificate of...

  19. Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

    SciTech Connect (OSTI)

    Boucau, Joseph; Mirabella, C.; Nilsson, Lennart; Kreitman, Paul J.; Obert, Estelle

    2013-07-01

    Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French

  20. High pressure oxygen furnace

    DOE Patents [OSTI]

    Morris, D.E.

    1992-07-14

    A high temperature high pressure oxygen furnace having a hybrid partially externally heated construction is disclosed. A metallic bar fabricated from an alloy having a composition of at least 45% nickel, 15% chrome, and 10% tungsten is utilized, the preferred alloy including 55% nickel, 22% chrome, 14% tungsten, 2% molybdenum, 3% iron (maximum) and 5% cobalt (maximum). The disclosed alloy is fabricated into 11/4 inch bar stock and has a length of about 17 inches. This bar stock is gun drilled for over 16 inches of its length with 0.400 inch aperture to define a closed high temperature, high pressure oxygen chamber. The opposite and closed end of the bar is provided with a small support aperture into which both a support and a thermocouple can be inserted. The closed end of the gun drilled bar is inserted into an oven, preferably heated by standard nickel chrome electrical elements and having a heavily insulated exterior. 5 figs.

  1. High pressure oxygen furnace

    DOE Patents [OSTI]

    Morris, Donald E.

    1992-01-01

    A high temperature high pressure oxygen furnace having a hybrid partially externally heated construction is disclosed. A metallic bar fabricated from an alloy having a composition of at least 45% nickel, 15% chrome, and 10% tungsten is utilized (the preferred alloy including 55% nickel, 22% chrome, 14% tungsten, 2% molybdenum, 3% iron (maximum) and 5% cobalt (maximum). The disclosed alloy is fabricated into 11/4 inch bar stock and has a length of about 17 inches. This bar stock is gun drilled for over 16 inches of its length with 0.400 inch aperture to define a closed high temperature, high pressure oxygen chamber. The opposite and closed end of the bar is provided with a small support aperture into which both a support and a thermocouple can be inserted. The closed end of the gun drilled bar is inserted into an oven, preferably heated by standard nickel chrome electrical elements and having a heavily insulated exterior.

  2. Continuous pressure letdown system

    DOE Patents [OSTI]

    Sprouse, Kenneth M.; Matthews, David R.; Langowski, Terry

    2010-06-08

    A continuous pressure letdown system connected to a hopper decreases a pressure of a 2-phase (gas and solid) dusty gas stream flowing through the system. The system includes a discharge line for receiving the dusty gas from the hopper, a valve, a cascade nozzle assembly positioned downstream of the discharge line, a purge ring, an inert gas supply connected to the purge ring, an inert gas throttle, and a filter. The valve connects the hopper to the discharge line and controls introduction of the dusty gas stream into the discharge line. The purge ring is connected between the discharge line and the cascade nozzle assembly. The inert gas throttle controls a flow rate of an inert gas into the cascade nozzle assembly. The filter is connected downstream of the cascade nozzle assembly.

  3. High pressure furnace

    DOE Patents [OSTI]

    Morris, D.E.

    1993-09-14

    A high temperature high pressure furnace has a hybrid partially externally heated construction. A metallic vessel fabricated from an alloy having a composition of at least 45% nickel, 15% chrome, and 10% tungsten is utilized (the preferred alloy including 55% nickel, 22% chrome, 14% tungsten, 2% molybdenum, 3% iron (maximum) and 5% cobalt (maximum)). The disclosed alloy is fabricated into 11/4 or 2 inch, 32 mm or 50 mm bar stock and has a length of about 22 inches, 56 cm. This bar stock has an aperture formed therein to define a closed high temperature, high pressure oxygen chamber. The opposite and closed end of the vessel is provided with a small blind aperture into which a thermocouple can be inserted. The closed end of the vessel is inserted into an oven, preferably heated by standard nickel chrome electrical elements and having a heavily insulated exterior. 19 figures.

  4. High pressure furnace

    DOE Patents [OSTI]

    Morris, Donald E.

    1993-01-01

    A high temperature high pressure furnace has a hybrid partially externally heated construction. A metallic vessel fabricated from an alloy having a composition of at least 45% nickel, 15% chrome, and 10% tungsten is utilized (the preferred alloy including 55% nickel, 22% chrome, 14% tungsten, 2% molybdenum, 3% iron (maximum) and 5% cobalt (maximum). The disclosed alloy is fabricated into 11/4 or 2 inch, 32 mm or 50 mm bar stock and has a length of about 22 inches, 56 cm. This bar stock has an aperture formed therein to define a closed high temperature, high pressure oxygen chamber. The opposite and closed end of the vessel is provided with a small blind aperture into which a thermocouple can be inserted. The closed end of the vessel is inserted into an oven, preferably heated by standard nickel chrome electrical elements and having a heavily insulated exterior.

  5. Pressure activated diaphragm bonder

    DOE Patents [OSTI]

    Evans, Leland B.; Malba, Vincent

    1997-01-01

    A device is available for bonding one component to another, particularly for bonding electronic components of integrated circuits, such as chips, to a substrate. The bonder device in one embodiment includes a bottom metal block having a machined opening wherein a substrate is located, a template having machined openings which match solder patterns on the substrate, a thin diaphragm placed over the template after the chips have been positioned in the openings therein, and a top metal block positioned over the diaphragm and secured to the bottom block, with the diaphragm retained therebetween. The top block includes a countersink portion which extends over at least the area of the template and an opening through which a high pressure inert gas is supplied to exert uniform pressure distribution over the diaphragm to keep the chips in place during soldering. A heating means is provided to melt the solder patterns on the substrate and thereby solder the chips thereto.

  6. Pressure suppression system

    DOE Patents [OSTI]

    Gluntz, Douglas M.

    1994-01-01

    A pressure suppression system includes a containment vessel surrounding a reactor pressure vessel and defining a drywell therein containing a non-condensable gas. An enclosed wetwell pool is disposed inside the containment vessel, and an enclosed gravity driven cooling system (GDCS) pool is disposed above the wetwell pool in the containment vessel. The GDCS pool includes a plenum for receiving through an inlet the non-condensable gas carried with steam from the drywell following a loss-of-coolant accident (LOCA). A condenser is disposed in the GDCS plenum for condensing the steam channeled therein and to trap the non-condensable gas therein. A method of operation includes draining the GDCS pool following the LOCA and channeling steam released into the drywell following the LOCA into the GDCS plenum for cooling along with the non-condensable gas carried therewith for trapping the gas therein.

  7. Pressure suppression system

    DOE Patents [OSTI]

    Gluntz, D.M.

    1994-10-04

    A pressure suppression system includes a containment vessel surrounding a reactor pressure vessel and defining a drywell therein containing a non-condensable gas. An enclosed wetwell pool is disposed inside the containment vessel, and an enclosed gravity driven cooling system (GDCS) pool is disposed above the wetwell pool in the containment vessel. The GDCS pool includes a plenum for receiving through an inlet the non-condensable gas carried with steam from the drywell following a loss-of-coolant accident (LOCA). A condenser is disposed in the GDCS plenum for condensing the steam channeled therein and to trap the non-condensable gas therein. A method of operation includes draining the GDCS pool following the LOCA and channeling steam released into the drywell following the LOCA into the GDCS plenum for cooling along with the non-condensable gas carried therewith for trapping the gas therein. 3 figs.

  8. Pressure activated diaphragm bonder

    DOE Patents [OSTI]

    Evans, L.B.; Malba, V.

    1997-05-27

    A device is available for bonding one component to another, particularly for bonding electronic components of integrated circuits, such as chips, to a substrate. The bonder device in one embodiment includes a bottom metal block having a machined opening wherein a substrate is located, a template having machined openings which match solder patterns on the substrate, a thin diaphragm placed over the template after the chips have been positioned in the openings therein, and a top metal block positioned over the diaphragm and secured to the bottom block, with the diaphragm retained therebetween. The top block includes a countersink portion which extends over at least the area of the template and an opening through which a high pressure inert gas is supplied to exert uniform pressure distribution over the diaphragm to keep the chips in place during soldering. A heating means is provided to melt the solder patterns on the substrate and thereby solder the chips thereto. 4 figs.

  9. High Pressure Chemistry

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pressure Chemistry - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear

  10. DEFLECTION PRESSURE TESTER

    DOE Patents [OSTI]

    Cooper, C.M.

    1961-01-01

    A method and apparatus for determining whether the jacket of a nuclear- fuel slug has a leak are described. The region of the jacket to be leak-tested is sealed off, and gas under pressure is applied thereto. If there is an imperfection, the gas will enter the jacket and bulge another region of the jacket. The bulge occurring is measured by a gage.

  11. High pressure storage vessel

    DOE Patents [OSTI]

    Liu, Qiang

    2013-08-27

    Disclosed herein is a composite pressure vessel with a liner having a polar boss and a blind boss a shell is formed around the liner via one or more filament wrappings continuously disposed around at least a substantial portion of the liner assembly combined the liner and filament wrapping have a support profile. To reduce susceptible to rupture a locally disposed filament fiber is added.

  12. Differential pressure pin discharge apparatus

    DOE Patents [OSTI]

    Oakley, D.J.

    1984-05-30

    Disclosed is a discharge assembly for allowing elongate pins to be discharged from an area of relatively low pressure to an area of relatively greater pressure. The discharge assembly includes a duck valve having a lip piece made of flexible material. The flexible lip piece responds to a fluctuating pressure created downstream by an aspirator. The aspirator reduces the downstream pressure sensed by the duck valve when the discharge assembly is in the open position. This allows elongate pins to be moved through the duck valve with no backflow because the aspirator pressure is less than the pressure in the low pressure area from which the pins originate. Closure of the assembly causes the aspirator static pressure to force the flexible duck valve lip piece into a tightly sealed position also preventing backflow. The discharge assembly can be easily controlled using a single control valve which blocks the flow of aspirator gas and closes the pins passageway extending through the assembly.

  13. High-Pressure Hydrogen Tanks

    Broader source: Energy.gov [DOE]

    Presentation on High-Pressure Hydrogen Tanks for the DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting held February 8-9, 2005 at Argonne National Laboratory

  14. HIGH PRESSURE DIES

    DOE Patents [OSTI]

    Wilson, W.B.

    1960-05-31

    A press was invented for subjecting specimens of bismuth, urania, yttria, or thoria to high pressures and temperatures. The press comprises die parts enclosing a space in which is placed an electric heater thermally insulated from the die parts so as not to damage them by heat. The die parts comprise two opposed inner frustoconical parts and an outer part having a double frustoconical recess receiving the inner parts. The die space decreases in size as the inner die parts move toward one another against the outer part and the inner parts, though very hard, do not fracture because of the mode of support provided by the outer part.

  15. Saltstone Osmotic Pressure

    SciTech Connect (OSTI)

    Nichols, Ralph L.; Dixon, Kenneth L.

    2013-09-23

    Recent research into the moisture retention properties of saltstone suggest that osmotic pressure may play a potentially significant role in contaminant transport (Dixon et al., 2009 and Dixon, 2011). The Savannah River Remediation Closure and Disposal Assessments Group requested the Savannah River National Laboratory (SRNL) to conduct a literature search on osmotic potential as it relates to contaminant transport and to develop a conceptual model of saltstone that incorporates osmotic potential. This report presents the findings of the literature review and presents a conceptual model for saltstone that incorporates osmotic potential. The task was requested through Task Technical Request HLW-SSF-TTR- 2013-0004.

  16. Advanced development of a pressurized ash agglomerating fluidized-bed coal gasification system. Quarterly progress report, April 1-June 30, 1982

    SciTech Connect (OSTI)

    1982-10-21

    The overall objective of the Westinghouse coal gasification program is to demonstrate the viability of the Westinghouse pressurized, fluidized bed, gasification system for the production of medium-Btu fuel gas for syngas, electrical power generation, chemical feedstocks, or industrial fuels and to obtain performance and scaleup data for the process and hardware. Progress reports are presented for the following tasks: (1) operation and maintenance of the process development unit (PDU); (2) process analysis; (3) cold flow scaleup facility; (4) process and component engineering and design; and (5) laboratory support studies. Some of the highlights for this period are: TP-032-1, a single stage, oxygen-steam blown gasifier test was conducted in three operational phases from March 30, 1982 through May 2, 1982; TP-032-2 was conducted in two operational phases from May 20, 1982 through May 27, 1982; TP-032-1 and TP-032-2 successfully served as shakedown and demonstrations of the full cyclone cold wall; no visible deposits were found on the cold wall after processing highly fouling coals; samples of product gas produced during TP-032-1, were passed through four different scrubbing solutions and analyzed for 78 EPA primary organic pollutants, all of which were found to be below detection limits; TP-M004, a CO/sub 2/ tracer gas test, was initiated and completed; data analysis of test TP-M002-2 was completed and conclusions are summarized in this report; design, procurement and fabrication of the solids injection device were completed; laboratory studies involved gas-solids flow modeling and coal/ash behavior. 2 references, 11 figures, 39 tables.

  17. Pressure Data Within BOP- XLS

    Broader source: Energy.gov [DOE]

    This file describes the components within the BOP and the pressure readings taken during diagnostic operations on May 25.

  18. Pressure Data Within BOP- ODS

    Broader source: Energy.gov [DOE]

    This file describes the components within the BOP and the pressure readings taken during diagnostic operations on May 25.

  19. High pressure capillary connector

    SciTech Connect (OSTI)

    Renzi, Ronald F.

    2005-08-09

    A high pressure connector capable of operating at pressures of 40,000 psi or higher is provided. This connector can be employed to position a first fluid-bearing conduit that has a proximal end and a distal end to a second fluid-bearing conduit thereby providing fluid communication between the first and second fluid-bearing conduits. The connector includes (a) an internal fitting assembly having a body cavity with (i) a lower segment that defines a lower segment aperture and (ii) an interiorly threaded upper segment, (b) a first member having a first member aperture that traverses its length wherein the first member aperture is configured to accommodate the first fluid-bearing conduit and wherein the first member is positioned in the lower segment of the internal fitting assembly, and (c) a second member having a second member aperture that traverses its length wherein the second member is positioned in the upper segment of the fitting assembly and wherein a lower surface of the second member is in contact with an upper surface of the first member to assert a compressive force onto the first member and wherein the first member aperture and the second member aperture are coaxial.

  20. Pressure polymerization of polyester

    DOE Patents [OSTI]

    Maurer, Charles J.; Shaw, Gordon; Smith, Vicky S.; Buelow, Steven J.; Tumas, William; Contreras, Veronica; Martinez, Ronald J.

    2000-08-29

    A process is disclosed for the preparation of a polyester polymer or polyester copolymer under superatmospheric pressure conditions in a pipe or tubular reaction under turbannular flow conditions. Reaction material having a glycol equivalents to carboxylic acid equivalents mole ratio of from 1.0:1 to 1.2:1, together with a superatmospheric dense gaseous medium are fed co-currently to the reactor. Dicarboxylic acid and/or diol raw materials may be injected into any of the reaction zones in the process during operation to achieve the overall desired mole ratio balance. The process operates at temperatures of from about 220.degree. C. to about 320.degree. C., with turbannular flow achieved before the polymer product and gas exit the reactor process. The pressure in the reaction zones can be in the range from 15 psia to 2500 psia. A polymer product having a DP of a greater than 40, more preferably at least about 70, is achieved by the transfer of water from the reacting material polymer melt to the gaseous medium in the reactor.

  1. The vapor pressures of explosives

    SciTech Connect (OSTI)

    Ewing, Robert G.; Waltman, Melanie J.; Atkinson, David A.; Grate, Jay W.; Hotchkiss, Peter

    2013-01-05

    The vapor pressures of many explosive compounds are extremely low and thus determining accurate values proves difficult. Many researchers, using a variety of methods, have measured and reported the vapor pressures of explosives compounds at single temperatures, or as a function of temperature using vapor pressure equations. There are large variations in reported vapor pressures for many of these compounds, and some errors exist within individual papers. This article provides a review of explosive vapor pressures and describes the methods used to determine them. We have compiled primary vapor pressure relationships traceable to the original citations and include the temperature ranges for which they have been determined. Corrected values are reported as needed and described in the text. In addition, after critically examining the available data, we calculate and tabulate vapor pressures at 25 C.

  2. Cradle and pressure grippers

    DOE Patents [OSTI]

    Muniak, John E.

    2001-01-01

    A gripper that is designed to incorporate the functions of gripping, supporting and pressure tongs into one device. The gripper has two opposing finger sections with interlocking fingers that incline and taper to form a wedge. The interlocking fingers are vertically off-set so that the opposing finger sections may close together allowing the inclined, tapered tips of the fingers to extend beyond the plane defined by the opposing finger section's engagement surface. The range of motion defined by the interlocking relationship of the finger sections allows the gripper to grab, lift and support objects of varying size and shape. The gripper has one stationary and one moveable finger section. Power is provided to the moveable finger section by an actuating device enabling the gripper to close around an object to be lifted. A lifting bail is attached to the gripper and is supported by a crane that provides vertical lift.

  3. Theoretical collapse pressures for two pressurized torispherical heads

    SciTech Connect (OSTI)

    Kalnins, A.; Updike, D.P.; Rana, M.D.

    1995-12-01

    In order to determine the pressures at which real torispherical heads fail upon a single application of pressure, two heads were pressurized in recent Praxair tests, and displacements and strains were recorded at various locations. In this paper, theoretical results for the two test heads are presented in the form of curves of pressure versus crown deflections, using the available geometry and material parameters. From these curves, limit and collapse pressures are calculated, using procedures permitted by the ASME B and PV Code Section 8/Div.2. These pressures are shown to vary widely, depending on the method and model used to calculate them. The effect of no stress relief on the behavior of the Praxair test heads is also evaluated and found to be of no significance for neither the objectives of the tests nor the objectives of this paper. The results of this paper are submitted as an enhancement to the experimental results recorded during the Praxair tests.

  4. Collapse pressure of coiled tubing

    SciTech Connect (OSTI)

    Yang, Y.S.

    1996-09-01

    The collapse pressure is a measure of an external force required to collapse a tube in the absence of internal pressure. It is defined as the minimum pressure required to yield the tube in the absence of internal pressure. Coiled tubing is sometimes used in high-pressure wells. If the external pressure becomes too high, the coiled tubing will collapse. This could not only lead to serious well-control problems, but may result in extensive fishing operations. A reliable safety criterion of collapse pressure for the coiled tubing is needed by the coiled tubing operators. Theoretical models of collapse pressure are well developed for perfectly round coiled tubing but not for oval coiled tubing. Coiled tubing is initially manufactured with nearly perfect roundness, sometimes having a small ovality (typically {le} 0.5%). Perfectly round CT becomes oval owing to the plastic mechanical deformation of the coiled tubing as it spooled on and off the reel and over the gooseneck. As the cycling continues, the ovality usually increases. This ovality significantly decreases the collapse failure pressure as compared to perfectly round tubing. In this paper, an analytical model of collapse pressure for oval tubing under axial tension or compression is developed based on elastic instability theory and the von Mises criterion. The theoretical model shows satisfactory agreement with experimental data.

  5. Advanced Pressure Boundary Materials

    SciTech Connect (OSTI)

    Santella, Michael L; Shingledecker, John P

    2007-01-01

    Increasing the operating temperatures of fossil power plants is fundamental to improving thermal efficiencies and reducing undesirable emissions such as CO{sub 2}. One group of alloys with the potential to satisfy the conditions required of higher operating temperatures is the advanced ferritic steels such as ASTM Grade 91, 9Cr-2W, and 12Cr-2W. These are Cr-Mo steels containing 9-12 wt% Cr that have martensitic microstructures. Research aimed at increasing the operating temperature limits of the 9-12 wt% Cr steels and optimizing them for specific power plant applications has been actively pursued since the 1970's. As with all of the high strength martensitic steels, specifying upper temperature limits for tempering the alloys and heat treating weldments is a critical issue. To support this aspect of development, thermodynamic analysis was used to estimate how this critical temperature, the A{sub 1} in steel terminology, varies with alloy composition. The results from the thermodynamic analysis were presented to the Strength of Weldments subgroup of the ASME Boiler & Pressure Vessel Code and are being considered in establishing maximum postweld heat treatment temperatures. Experiments are also being planned to verify predictions. This is part of a CRADA project being done with Alstom Power, Inc.

  6. Screenable Pressure-Sensitive Adhesives

    Broader source: Energy.gov [DOE]

    Pressure-sensitive adhesives (PSAs) in recycled paper create a number of problems for the recycling process, including lost production and diminished product quality. Unlike conventional PSAs, a...

  7. Pressure testing of torispherical heads

    SciTech Connect (OSTI)

    Rana, M.D.; Kalnins, A.; Updike, D.P.

    1995-12-01

    Two vessels fabricated from SA516-70 steel with 6% knuckle radius torispherical heads were tested under internal pressure to failure. The D/t ratios of Vessel 1 and Vessel 2 were 238 and 185 respectively. The calculated maximum allowable working pressures of Vessel 1 and 2 heads using the ASME Section 8, Div. 1 rules and measured dimensions were 85 and 110 psi, respectively. Vessel 1 failed at a nozzle weld in the cylindrical shell at 700 psi pressure. Neither buckling nor any other objectionable deformation of the head was observed at a theoretical double-elastic-slope collapse pressure of 241 and a calculated buckling pressure of 270 psi. Buckles were observed developing slowly after 600 psi pressure, and a total of 22 buckles were observed after the test, having the maximum amplitude of 0.15 inch. Vessel 2 failed at the edge of the longitudinal weld of the cylindrical shell at 1,080 psi pressure. Neither buckling nor any other objectionable deformation of the head was observed up to the final pressure, which exceeded the theoretical double-elastic-slope collapse and calculated buckling pressures of 274 psi and 342 psi, respectively.

  8. Scale-Up of Palladium Powder Production Process for Use in the Tritium Facility at Westinghouse, Savannah River, SC/Summary of FY99-FY01 Results for the Preparation of Palladium Using the Sandia/LANL Process

    SciTech Connect (OSTI)

    David P. Baldwin; Daniel S. Zamzow; R. Dennis Vigil; Jesse T. Pikturna

    2001-08-24

    Palladium used at Savannah River (SR) for process tritium storage is currently obtained from a commercial source. In order to understand the processes involved in preparing this material, SR is supporting investigations into the chemical reactions used to synthesize this material. The material specifications are shown in Table 1. An improved understanding of the chemical processes should help to guarantee a continued reliable source of Pd in the future. As part of this evaluation, a work-for-others contract between Westinghouse Savannah River Company and Ames Laboratory (AL) was initiated. During FY98, the process for producing Pd powder developed in 1986 by Dan Grove of Mound Applied Technologies, USDOE (the Mound muddy water process) was studied to understand the processing conditions that lead to changes in morphology in the final product. During FY99 and FY00, the process for producing Pd powder that has been used previously at Sandia and Los Alamos National Laboratories (the Sandia/LANL process) was studied to understand the processing conditions that lead to changes in the morphology of the final Pd product. During FY01, scale-up of the process to batch sizes greater than 600 grams of Pd using a 20-gallon Pfaudler reactor was conducted by the Iowa State University (ISU) Chemical Engineering Department. This report summarizes the results of FY99-FY01 Pd processing work done at AL and ISU using the Sandia/LANL process. In the Sandia/LANL process, Pd is dissolved in a mixture of nitric and hydrochloric acids. A number of chemical processing steps are performed to yield an intermediate species, diamminedichloropalladium (Pd(NH{sub 3}){sub 2}Cl{sub 2}, or DADC-Pd), which is isolated. In the final step of the process, the Pd(NH{sub 3}){sub 2}Cl{sub 2} intermediate is subsequently redissolved, and Pd is precipitated by the addition of a reducing agent (RA) mixture of formic acid and sodium formate. It is at this point that the morphology of the Pd product is

  9. Electrokinetically pumped high pressure sprays

    DOE Patents [OSTI]

    Schoeniger, Joseph S.; Paul, Phillip H.; Schoeniger, Luke

    2002-01-01

    An electrokinetic pump capable of producing high pressure is combined with a nozzle having a submicron orifice to provide a high pressure spray device. Because of its small size, the device can be contained within medical devices such as an endoscope for delivering biological materials such as DNA, chemo therapeutic agents, or vaccines to tissues and cells.

  10. Electrokinetically pumped high pressure sprays

    DOE Patents [OSTI]

    Schoeniger, Joseph S.; Paul, Phillip H.; Schoeniger, Luke

    2005-11-01

    An electrokinetic pump capable of producing high pressure is combined with a nozzle having a submicron orifice to provide a high pressure spray device. Because of its small size, the device can be contained within medical devices such as an endoscope for delivering biological materials such as DNA, chemo therapeutic agents, or vaccines to tissues and cells.

  11. Balanced pressure gerotor fuel pump

    DOE Patents [OSTI]

    Raney, Michael Raymond; Maier, Eugen

    2004-08-03

    A gerotor pump for pressurizing gasoline fuel is capable of developing pressures up to 2.0 MPa with good mechanical and volumetric efficiency and satisfying the durability requirements for an automotive fuel pump. The pump has been designed with optimized clearances and by including features that promote the formation of lubricating films of pressurized fuel. Features of the improved pump include the use of a shadow port in the side plate opposite the outlet port to promote balancing of high fuel pressures on the opposite sides of the rotors. Inner and outer rotors have predetermined side clearances with the clearances of the outer rotor being greater than those of the inner rotor in order to promote fuel pressure balance on the sides of the outer rotor. Support of the inner rotor and a drive shaft on a single bushing with bearing sleeves maintains concentricity. Additional features are disclosed.

  12. Preliminary development of an integrated approach to the evaluation of pressurized thermal shock as applied to the Oconee Unit 1 Nuclear Power Plant

    SciTech Connect (OSTI)

    Burns, T J; Cheverton, R D; Flanagan, G F; White, J D; Ball, D G; Lamonica, L B; Olson, R

    1986-05-01

    An evaluation of the risk to the Oconee-1 nuclear plant due to pressurized thermal shock (PTS) has been Completed by Oak Ridge National Laboratory (ORNL). This evaluaion was part of a Nuclear Regulatory Commission (NRC) program designed to study the PTS risk to three nuclear plants: Oconee-1, a Babcock and Wilco reactor plant owned and operated by Duke Power Company; Calvert Cliffs-1, a Combustion Engineering reactor plant owned and operated by Baltimore Gas and Electric company; and H.B. Robinson-2, a Westinghouse reactor plant owned and operated by Carolina Power and Light Company. Studies of Calvert Cliffs-1 and H.B. Robinson-2 are still underway. The specific objectives of the Oconee-1 study were to: (1) provide a best estimate of the probability of a through-the-wall crack (TWC) occurring in the reactor pressure vessel as a result of PTS; (2) determine dominant accident sequences, plant features, operator and control actions and uncertainty in the PTS risk; and (3) evaluate effectiveness of potential corrective measures.

  13. Electrokinetic high pressure hydraulic system

    DOE Patents [OSTI]

    Paul, Phillip H.; Rakestraw, David J.

    2000-01-01

    A compact high pressure hydraulic pump having no moving mechanical parts for converting electric potential to hydraulic force. The electrokinetic pump, which can generate hydraulic pressures greater than 2500 psi, can be employed to compress a fluid, either liquid or gas, and manipulate fluid flow. The pump is particularly useful for capillary-base systems. By combining the electrokinetic pump with a housing having chambers separated by a flexible member, fluid flow, including high pressure fluids, is controlled by the application of an electric potential, that can vary with time.

  14. Pressure sensor for sealed containers

    DOE Patents [OSTI]

    Hodges, Franklin R.

    2001-01-01

    A magnetic pressure sensor for sensing a pressure change inside a sealed container. The sensor includes a sealed deformable vessel having a first end attachable to an interior surface of the sealed container, and a second end. A magnet mounted to the vessel second end defining a distance away from the container surface provides an externally detectable magnetic field. A pressure change inside the sealed container causes deformation of the vessel changing the distance of the magnet away from the container surface, and thus the detectable intensity of the magnetic field.

  15. Pressure dispensable gelled alcohol fuel

    SciTech Connect (OSTI)

    Monick, J.A.

    1982-12-28

    A pressurized fuel gel composition particularly suitable for igniting wood and charcoal consisting essentially of, by weight, 42-90% of at least one c1-c6 monohydric alcohol, 0.5-6% of water-soluble gelling agent, up to about 24% water and a correlated amount of propellant from 0.5% to 30% characterized by a gel structure which forms a shape retaining mass upon contact with wood or charcoal that is maintained during the burning of said composition. Also within the scope of the invention is an aerosol product comprising said pressurized composition enclosed within a pressure-tight container having valve means for expelling the composition.

  16. Low pressure carbonylation of heterocycles

    DOE Patents [OSTI]

    Coates, Geoffrey W.; Kramer, John W.; Schmidt, Joseph A. R.

    2011-01-25

    Heterocycles, e.g., epoxides, are carbonylated at low pressure with high percentage conversion to cyclic, ring expanded products using the catalyst ##STR00001## where L is tetrahydrofuran (THF).

  17. Low pressure carbonylation of heterocycles

    DOE Patents [OSTI]

    Coates, Geoffrey W.; Kramer, John

    2009-08-04

    Heterocycles, e.g., epoxides, are carbonylated at low pressure with high percentage conversion to cyclic, ring expanded products using the catalyst ##STR00001## where L is tetrahydrofuran (THF).

  18. Electrokinetic high pressure hydraulic system

    DOE Patents [OSTI]

    Paul, Phillip H.; Rakestraw, David J.; Arnold, Don W.; Hencken, Kenneth R.; Schoeniger, Joseph S.; Neyer, David W.

    2003-06-03

    An electrokinetic high pressure hydraulic pump for manipulating fluids in capillary-based system. The pump uses electro-osmotic flow to provide a high pressure hydraulic system, having no moving mechanical parts, for pumping and/or compressing fluids, for providing valve means and means for opening and closing valves, for controlling fluid flow rate, and manipulating fluid flow generally and in capillary-based systems (microsystems), in particular. The compact nature of the inventive high pressure hydraulic pump provides the ability to construct a micro-scale or capillary-based HPLC system that fulfills the desire for small sample quantity, low solvent consumption, improved efficiency, the ability to run samples in parallel, and field portability. Control of pressure and solvent flow rate is achieved by controlling the voltage applied to an electrokinetic pump.

  19. Electrokinetic high pressure hydraulic system

    DOE Patents [OSTI]

    Paul, Phillip H.; Rakestraw, David J.; Arnold, Don W.; Hencken, Kenneth R.; Schoeniger, Joseph S.; Neyer, David W.

    2001-01-01

    An electrokinetic high pressure hydraulic pump for manipulating fluids in capillary-based systems. The pump uses electro-osmotic flow to provide a high pressure hydraulic system, having no moving mechanical parts, for pumping and/or compressing fluids, for providing valve means and means for opening and closing valves, for controlling fluid flow rate, and manipulating fluid flow generally and in capillary-based systems (Microsystems), in particular. The compact nature of the inventive high pressure hydraulic pump provides the ability to construct a micro-scale or capillary-based HPLC system that fulfills the desire for small sample quantity, low solvent consumption, improved efficiency, the ability to run samples in parallel, and field portability. Control of pressure and solvent flow rate is achieved by controlling the voltage applied to an electrokinetic pump.

  20. Pressure compensated flow control valve

    DOE Patents [OSTI]

    Minteer, Daniel J.

    1999-01-01

    The invention is an air flow control valve which is capable of maintaining a constant flow at the outlet despite changes in the inlet or outlet pressure. The device consists of a shell assembly with an inlet chamber and outlet chamber separated by a separation plate. The chambers are connected by an orifice. Also located within the inlet chamber is a port controller assembly. The port controller assembly consists of a differential pressure plate and port cap affixed thereon. The cap is able to slide in and out of the orifice separating the inlet and outlet chambers. When the pressure differential is sufficient, the differential pressure plate rises or falls to maintain a constant air flow. Movement of the port controller assembly does not require the use of seals, diaphragms, tight tolerances, bushings, bearings, hinges, guides, or lubricants.

  1. Spray bottle apparatus with pressure multiplying pistons

    DOE Patents [OSTI]

    Moss, Owen R.; Gordon, Norman R.; DeFord, Henry S.

    1990-01-01

    The present invention comprises a spray bottle in which the pressure resulting from the gripping force applied by the user is amplified and this increased pressure used in generating a spray such as an aerosol or fluid stream. In its preferred embodiment, the invention includes a high pressure chamber and a corresponding piston which is operative for driving fluid out of this chamber at high pressure through a spray nozzle and a low pressure chamber and a corresponding piston which is acted upon the hydraulic pressure within the bottle resulting from the gripping force. The low pressure chamber and piston are of larger size than the high pressure chamber and piston. The pistons are rigidly connected so that the force created by the pressure acting on the piston in the low pressure chamber is transmitted to the piston in the high pressure chamber where it is applied over a more limited area thereby generating greater hydraulic pressure for use in forming the spray.

  2. Flash High-Pressure Condensate to Regenerate Low-Pressure Steam...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Flash High-Pressure Condensate to Regenerate Low-Pressure Steam Low-pressure process steam requirements are usually met by throttling high- pressure steam, but a portion of the ...

  3. Conformable pressure vessel for high pressure gas storage

    DOE Patents [OSTI]

    Simmons, Kevin L.; Johnson, Kenneth I.; Lavender, Curt A.; Newhouse, Norman L.; Yeggy, Brian C.

    2016-01-12

    A non-cylindrical pressure vessel storage tank is disclosed. The storage tank includes an internal structure. The internal structure is coupled to at least one wall of the storage tank. The internal structure shapes and internally supports the storage tank. The pressure vessel storage tank has a conformability of about 0.8 to about 1.0. The internal structure can be, but is not limited to, a Schwarz-P structure, an egg-crate shaped structure, or carbon fiber ligament structure.

  4. High pressure neon arc lamp

    DOE Patents [OSTI]

    Sze, Robert C.; Bigio, Irving J.

    2003-07-15

    A high pressure neon arc lamp and method of using the same for photodynamic therapies is provided. The high pressure neon arc lamp includes a housing that encloses a quantity of neon gas pressurized to about 500 Torr to about 22,000 Torr. At each end of the housing the lamp is connected by electrodes and wires to a pulse generator. The pulse generator generates an initial pulse voltage to breakdown the impedance of the neon gas. Then the pulse generator delivers a current through the neon gas to create an electrical arc that emits light having wavelengths from about 620 nanometers to about 645 nanometers. A method for activating a photosensitizer is provided. Initially, a photosensitizer is administered to a patient and allowed time to be absorbed into target cells. Then the high pressure neon arc lamp is used to illuminate the target cells with red light having wavelengths from about 620 nanometers to about 645 nanometers. The red light activates the photosensitizers to start a chain reaction that may involve oxygen free radicals to destroy the target cells. In this manner, a high pressure neon arc lamp that is inexpensive and efficiently generates red light useful in photodynamic therapy is provided.

  5. Version pressure feedback mechanisms for speculative versioning...

    Office of Scientific and Technical Information (OSTI)

    Version pressure feedback mechanisms for speculative versioning caches Citation Details In-Document Search Title: Version pressure feedback mechanisms for speculative versioning ...

  6. Level indicator for pressure vessels

    DOE Patents [OSTI]

    Not Available

    1982-04-28

    A liquid-level monitor for tracking the level of a coal slurry in a high-pressure vessel including a toroidal-shaped float with magnetically permeable bands thereon disposed within the vessel, two pairs of magnetic-field generators and detectors disposed outside the vessel adjacent the top and bottom thereof and magnetically coupled to the magnetically permeable bands on the float, and signal-processing circuitry for combining signals from the top and bottom detectors for generating a monotonically increasing analog control signal which is a function of liquid level. The control signal may be utilized to operate high-pressure control valves associated with processes in which the high-pressure vessel is used.

  7. Pressurized-fluid-operated engine

    SciTech Connect (OSTI)

    Holleyman, J.E.

    1990-01-30

    This patent describes a pressurized-fluid-operated reciprocating engine for providing output power by use of a pressurized gas that expands within the engine without combustion. It comprises: an engine block having a plurality of cylinders within which respective pistons are reciprocatable to provide a rotary power output; gas inlet means connected with the engine block for introducing a pressurized gas into the respective cylinders in a predetermined, timed relationship to provide a smooth power output from the engine; gas outlet means connected with the engine block for conveying exhaust gas from the respective cylinders after the gas expanded to move the pistons within the cylinders; and recirculation means extending between the inlet means and the outlet means for recirculation a predetermined quantity of exhaust gas. The recirculation means including ejector means for drawing exhaust gas into the recirculation means.

  8. High pressure liquid level monitor

    DOE Patents [OSTI]

    Bean, Vern E.; Long, Frederick G.

    1984-01-01

    A liquid level monitor for tracking the level of a coal slurry in a high-pressure vessel including a toroidal-shaped float with magnetically permeable bands thereon disposed within the vessel, two pairs of magnetic field generators and detectors disposed outside the vessel adjacent the top and bottom thereof and magnetically coupled to the magnetically permeable bands on the float, and signal processing circuitry for combining signals from the top and bottom detectors for generating a monotonically increasing analog control signal which is a function of liquid level. The control signal may be utilized to operate high-pressure control valves associated with processes in which the high-pressure vessel is used.

  9. Atmospheric-pressure plasma jet

    DOE Patents [OSTI]

    Selwyn, Gary S.

    1999-01-01

    Atmospheric-pressure plasma jet. A .gamma.-mode, resonant-cavity plasma discharge that can be operated at atmospheric pressure and near room temperature using 13.56 MHz rf power is described. Unlike plasma torches, the discharge produces a gas-phase effluent no hotter than 250.degree. C. at an applied power of about 300 W, and shows distinct non-thermal characteristics. In the simplest design, two concentric cylindrical electrodes are employed to generate a plasma in the annular region therebetween. A "jet" of long-lived metastable and reactive species that are capable of rapidly cleaning or etching metals and other materials is generated which extends up to 8 in. beyond the open end of the electrodes. Films and coatings may also be removed by these species. Arcing is prevented in the apparatus by using gas mixtures containing He, which limits ionization, by using high flow velocities, and by properly shaping the rf-powered electrode. Because of the atmospheric pressure operation, no ions survive for a sufficiently long distance beyond the active plasma discharge to bombard a workpiece, unlike low-pressure plasma sources and conventional plasma processing methods.

  10. Stirling engine with pressurized crankcase

    DOE Patents [OSTI]

    Corey, John A.

    1988-01-01

    A two piston Stirling engine wherein the pistons are coupled to a common crankshaft via bearing means, the pistons include pad means to minimize friction between the pistons and the cylinders during reciprocation of the pistons, means for pressurizing the engine crankcase, and means for cooling the crankshaft and the bearing means eliminating the need for oil in the crankcase.

  11. Method of producing a high pressure gas

    DOE Patents [OSTI]

    Bingham, Dennis N.; Klingler, Kerry M.; Zollinger, William T.

    2006-07-18

    A method of producing a high pressure gas is disclosed and which includes providing a container; supplying the container with a liquid such as water; increasing the pressure of the liquid within the container; supplying a reactant composition such as a chemical hydride to the liquid under pressure in the container and which chemically reacts with the liquid to produce a resulting high pressure gas such as hydrogen at a pressure of greater than about 100 pounds per square inch of pressure; and drawing the resulting high pressure gas from the container.

  12. Stabilizing System Pressure | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stabilizing System Pressure Stabilizing System Pressure This tip sheet summarizes three methods used to stabilize compressed air system pressure: adequate primary and secondary storage, Pressure/Flow Controllers (P/FCs), and dedicated compressors. COMPRESSED AIR TIP SHEET #8 Stabilizing System Pressure (August 2004) (243.38 KB) More Documents & Publications Compressed Air Storage Strategies Compressed Air System Control Strategies Analyzing Your Compressed Air System

  13. Ambient pressure fuel cell system

    DOE Patents [OSTI]

    Wilson, Mahlon S.

    2000-01-01

    An ambient pressure fuel cell system is provided with a fuel cell stack formed from a plurality of fuel cells having membrane/electrode assemblies (MEAs) that are hydrated with liquid water and bipolar plates with anode and cathode sides for distributing hydrogen fuel gas and water to a first side of each one of the MEAs and air with reactant oxygen gas to a second side of each one of the MEAs. A pump supplies liquid water to the fuel cells. A recirculating system may be used to return unused hydrogen fuel gas to the stack. A near-ambient pressure blower blows air through the fuel cell stack in excess of reaction stoichiometric amounts to react with the hydrogen fuel gas.

  14. Variable pressure thermal insulating jacket

    DOE Patents [OSTI]

    Nelson, P.A.; Malecha, R.F.; Chilenskas, A.A.

    1994-09-20

    A device for controlled insulation of a thermal device is disclosed. The device includes a thermal jacket with a closed volume able to be evacuated to form an insulating jacket around the thermal source. A getter material is in communication with the closed volume of the thermal jacket. The getter material can absorb and desorb a control gas to control gas pressure in the volume of the thermal jacket to control thermal conductivity in the thermal jacket. 10 figs.

  15. High Pressure Hydrogen Tank Manufacturing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workshop High Pressure Hydrogen Tank Manufacturing Mark Leavitt Quantum Fuel Systems Technologies Worldwide, Inc. August 11, 2011 This presentation does not contain any proprietary, confidential, or otherwise restricted information History of Innovations... Announced breakthrough in all-composite lightweight, high capacity, low-cost fuel storage technologies. * Developed a series of robust, OEM compatible electronic control products. Developed H 2 storage system for SunLine Tran-sit Hythane®

  16. Variable pressure thermal insulating jacket

    DOE Patents [OSTI]

    Nelson, Paul A. (Wheaton, IL); Malecha, Richard F. (Naperville, IL); Chilenskas, Albert A. (Chicago, IL)

    1994-01-01

    A device for controlled insulation of a thermal device. The device includes a thermal jacket with a closed volume able to be evacuated to form an insulating jacket around the thermal source. A getter material is in communcation with the closed volume of the thermal jacket. The getter material can absorb and desorb a control gas to control gas pressure in the volume of the thermal jacket to control thermal conductivity in the thermal jacket.

  17. High pressure xenon ionization detector

    DOE Patents [OSTI]

    Markey, John K. (New Haven, CT)

    1989-01-01

    A method is provided for detecting ionization comprising allowing particles that cause ionization to contact high pressure xenon maintained at or near its critical point and measuring the amount of ionization. An apparatus is provided for detecting ionization, the apparatus comprising a vessel containing a ionizable medium, the vessel having an inlet to allow high pressure ionizable medium to enter the vessel, a means to permit particles that cause ionization of the medium to enter the vessel, an anode, a cathode, a grid and a plurality of annular field shaping rings, the field shaping rings being electrically isolated from one another, the anode, cathode, grid and field shaping rings being electrically isolated from one another in order to form an electric field between the cathode and the anode, the electric field originating at the anode and terminating at the cathode, the grid being disposed between the cathode and the anode, the field shaping rings being disposed between the cathode and the grid, the improvement comprising the medium being xenon and the vessel being maintained at a pressure of 50 to 70 atmospheres and a temperature of 0.degree. to 30.degree. C.

  18. ITER Port Interspace Pressure Calculations

    SciTech Connect (OSTI)

    Carbajo, Juan J; Van Hove, Walter A

    2016-01-01

    The ITER Vacuum Vessel (VV) is equipped with 54 access ports. Each of these ports has an opening in the bioshield that communicates with a dedicated port cell. During Tokamak operation, the bioshield opening must be closed with a concrete plug to shield the radiation coming from the plasma. This port plug separates the port cell into a Port Interspace (between VV closure lid and Port Plug) on the inner side and the Port Cell on the outer side. This paper presents calculations of pressures and temperatures in the ITER (Ref. 1) Port Interspace after a double-ended guillotine break (DEGB) of a pipe of the Tokamak Cooling Water System (TCWS) with high temperature water. It is assumed that this DEGB occurs during the worst possible conditions, which are during water baking operation, with water at a temperature of 523 K (250 C) and at a pressure of 4.4 MPa. These conditions are more severe than during normal Tokamak operation, with the water at 398 K (125 C) and 2 MPa. Two computer codes are employed in these calculations: RELAP5-3D Version 4.2.1 (Ref. 2) to calculate the blowdown releases from the pipe break, and MELCOR, Version 1.8.6 (Ref. 3) to calculate the pressures and temperatures in the Port Interspace. A sensitivity study has been performed to optimize some flow areas.

  19. High pressure xenon ionization detector

    DOE Patents [OSTI]

    Markey, J.K.

    1989-11-14

    A method is provided for detecting ionization comprising allowing particles that cause ionization to contact high pressure xenon maintained at or near its critical point and measuring the amount of ionization. An apparatus is provided for detecting ionization, the apparatus comprising a vessel containing a ionizable medium, the vessel having an inlet to allow high pressure ionizable medium to enter the vessel, a means to permit particles that cause ionization of the medium to enter the vessel, an anode, a cathode, a grid and a plurality of annular field shaping rings, the field shaping rings being electrically isolated from one another, the anode, cathode, grid and field shaping rings being electrically isolated from one another in order to form an electric field between the cathode and the anode, the electric field originating at the anode and terminating at the cathode, the grid being disposed between the cathode and the anode, the field shaping rings being disposed between the cathode and the grid, the improvement comprising the medium being xenon and the vessel being maintained at a pressure of 50 to 70 atmospheres and a temperature of 0 to 30 C. 2 figs.

  20. Flash High-Pressure Condensate to Regenerate Low-Pressure Steam...

    Broader source: Energy.gov (indexed) [DOE]

    Use Steam Jet Ejectors or Thermocompressors to Reduce Venting of Low-Pressure Steam Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators Use Vapor ...

  1. PRESSURE RELIEF DEVICE DATA SHEET FORM PS-5 Pressure System Number...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DEVICE DATA Device Type Safety Relief Valve Rupture Disk Other (specify) ... test passed: YES NO Pop test (valve only) pressure: Test pressure within 5% or ...

  2. Pressure Data: BOP Summary 28 May 2010

    Broader source: Energy.gov [DOE]

    This is a schematic of the BOP stack with the static pressure data recoded on the 28th of May and shows pressures before and after the attempted top kill and junk shots.

  3. Air separation with temperature and pressure swing

    DOE Patents [OSTI]

    Cassano, Anthony A.

    1986-01-01

    A chemical absorbent air separation process is set forth which uses a temperature swing absorption-desorption cycle in combination with a pressure swing wherein the pressure is elevated in the desorption stage of the process.

  4. Electokinetic high pressure hydraulic system

    DOE Patents [OSTI]

    Paul, Phillip H.; Rakestraw, David J.

    2000-01-01

    A compact high pressure hydraulic system having no moving parts for converting electric potential to hydraulic force and for manipulating fluids. Electro-osmotic flow is used to provide a valve and means to compress a fluid or gas in a capillary-based system. By electro-osmotically moving an electrolyte between a first position opening communication between a fluid inlet and outlet and a second position closing communication between the fluid inlet and outlet the system can be configured as a valve. The system can also be used to generate forces as large as 2500 psi that can be used to compress a fluid, either a liquid or a gas.

  5. Non-plugging pressure tap

    DOE Patents [OSTI]

    Echtler, Joseph P. (Pittsburgh, PA)

    1978-01-01

    A pressure tap having utility in an environment of a solid-gas phase process flow includes a tubular coupling part having attached over a passage therethrough at an end opening thereof exposed to the flow a grating of spaced bars, and affixed internally across a passage therethrough so as to cover over an opening therein a screen which maintains contained within the passage between it and the grating a matrix of smooth spheres. The grating bars are so oriented by the disposition of the aforesaid end opening with respect to the flow such that accumulations of solids therebetween tending to bridge the opening are removed therefrom by the flow.

  6. Reactor pressure vessel vented head

    DOE Patents [OSTI]

    Sawabe, James K.

    1994-01-11

    A head for closing a nuclear reactor pressure vessel shell includes an arcuate dome having an integral head flange which includes a mating surface for sealingly mating with the shell upon assembly therewith. The head flange includes an internal passage extending therethrough with a first port being disposed on the head mating surface. A vent line includes a proximal end disposed in flow communication with the head internal passage, and a distal end disposed in flow communication with the inside of the dome for channeling a fluid therethrough. The vent line is fixedly joined to the dome and is carried therewith when the head is assembled to and disassembled from the shell.

  7. High pressure fiber optic sensor system

    DOE Patents [OSTI]

    Guida, Renato; Xia, Hua; Lee, Boon K; Dekate, Sachin N

    2013-11-26

    The present application provides a fiber optic sensor system. The fiber optic sensor system may include a small diameter bellows, a large diameter bellows, and a fiber optic pressure sensor attached to the small diameter bellows. Contraction of the large diameter bellows under an applied pressure may cause the small diameter bellows to expand such that the fiber optic pressure sensor may measure the applied pressure.

  8. Carbon nanotube temperature and pressure sensors

    DOE Patents [OSTI]

    Ivanov, Ilia N; Geohegan, David Bruce

    2013-10-29

    The present invention, in one embodiment, provides a method of measuring pressure or temperature using a sensor including a sensor element composed of a plurality of carbon nanotubes. In one example, the resistance of the plurality of carbon nanotubes is measured in response to the application of temperature or pressure. The changes in resistance are then recorded and correlated to temperature or pressure. In one embodiment, the present invention provides for independent measurement of pressure or temperature using the sensors disclosed herein.

  9. DETONATION PRESSURE MEASUREMENTS ON PETN

    SciTech Connect (OSTI)

    Green, L G; Lee, E L

    2006-06-23

    PETN is widely recognized as an example of nearly ideal detonation performance. The chemical composition is such that little or no carbon is produced in the detonation products. The reaction zone width is less than currently detectable. (<1 ns) Observations on PETN have thus become a baseline for EOS model predictions. It has therefore become important to characterize the detonation parameters as accurately as possible in order to provide the most exacting comparisons of EOS predictions with experimental results. We undertook a painstaking review of the detonation pressure measurements reported in an earlier work that was presented at the Fifth Detonation Symposium and found that corrections were required in determining the shock velocity in the PMMA witness material. We also refined the impedance calculation to account for the difference between the usual ''acoustic'' method and the more accurate Riemann integral. Our review indicates that the CJ pressures previously reported for full density PETN require an average lowering of about 6 percent. The lower densities require progressively smaller corrections. We present analysis of the records, supporting hydrodynamic simulations, the Riemann integral results, and EOS parameter values derived from the revised results.

  10. High-pressure microhydraulic actuator

    DOE Patents [OSTI]

    Mosier, Bruce P. [San Francisco, CA; Crocker, Robert W. [Fremont, CA; Patel, Kamlesh D. [Dublin, CA

    2008-06-10

    Electrokinetic ("EK") pumps convert electric to mechanical work when an electric field exerts a body force on ions in the Debye layer of a fluid in a packed bed, which then viscously drags the fluid. Porous silica and polymer monoliths (2.5-mm O.D., and 6-mm to 10-mm length) having a narrow pore size distribution have been developed that are capable of large pressure gradients (250-500 psi/mm) when large electric fields (1000-1500 V/cm) are applied. Flowrates up to 200 .mu.L/min and delivery pressures up to 1200 psi have been demonstrated. Forces up to 5 lb-force at 0.5 mm/s (12 mW) have been demonstrated with a battery-powered DC-DC converter. Hydraulic power of 17 mW (900 psi@ 180 uL/min) has been demonstrated with wall-powered high voltage supplies. The force and stroke delivered by an actuator utilizing an EK pump are shown to exceed the output of solenoids, stepper motors, and DC motors of similar size, despite the low thermodynamic efficiency.